Loading...
HomeMy WebLinkAbout1907 & 1909 S Evergreen St - Plan(N) ADU #2 UNIT 1909 748 SF 2 BED/2 BATH (N ) 4 " A B S S E W E R L I N E , MI N . 2 % S L O P E (E) 4" SEWER LINE TO STREET (V.I.F.) (N) WATER LINE: 1" COPPER TYPE "L" OR PEX PIPE, MIN. 18" BELOW GROUND (E) GARAGE 603 SF ℄ PROPERTY LINE - 135.00' (E ) D E C K 40 3 S F 18'-2" (E) GAS METER 12'-0" (E) GAS METER (E) GAS METER (E) 2ND FLOOR UNIT #1/2 894 SF (2 BED/1 BATH OVER (E) 1ST FLOOR UNIT #A 1,272 SF 3 BED/1 BATH S E V E R G R E E N S T 30'-0" TO CENTERLINE 4'-0"6'-0" 20'-4"10'-8" 6'-9" 20'-7" 38'-3" 5'-0" 9'-8"24'-6"3'-0"41'-0"5'-0" 19'-4" 21'-2" 20'-1" 6'-9" 29'-8" 27'-0"6'-3"6'-9"37'-3"26'-6"10'-8" 31'-0"31'-0" 3'-0" PROPERTY LINE - 135.00' PR O P E R T Y L I N E - 8 0 . 0 0 ' (E) 6'H BLOCK WALL (E) WATER METER (E) POWER POLE UPPER FLOOR WALL (E) POWER POLE 4:124:12 4:12 (E ) 4 - G A N G PA N E L , 30 A E A C H 19'-4" 29'-8" PR O P E R T Y L I N E - 8 0 . 0 0 ' 0.5:12 0.5:12 18 " ( T Y P . ) 18 " ( T Y P . ) 2% 2% 2% AC 5'-0" 19'-0"19'-0" 37'-9" (N ) A D U # 2 20 0 A P A N E L (N ) A D U # 1 20 0 A P A N E L (N) ADU #1 UNIT 1907 747 SF 2 BED/2 BATH (N) PORCH 37 SF3'-3" 32'-0" 11'-6"13'-0" (N ) A D U # 1 2 0 0 A SU B - P A N E L 7'-10" 11'-1" (N) PATIO COVER 180 SF 5'-0" 6'-0" 14'-1" 5'-0" 14'-8" 5'-0" (N) PORCH 142 SF AC 20'-0" (E) DRIVEWAY AND IMPERVIOUS SURFACE FRONT YARD LANDSCAPING (PER S.A.M.C. SEC. 41-240) 4: 1 2 12" (TYP.)12" (TYP.) 12" (TYP.) 12" (TYP.) 4: 1 2 4: 1 2 4: 1 2 10 SD-1 1-HR RATED OVERHANG 11 SD-1 1-HR RATED OVERHANG 14 SD-1 1-HR RATED OVERHANG AND WALL 15 SD-1 1-HR RATED OVERHANG AND WALL10 SD-1 1-HR RATED OVERHANG 4:124:12 4:124:12 11 SD-1 1-HR RATED OVERHANG 10 SD-1 1-HR RATED OVERHANG 11 SD-1 1-HR RATED OVERHANG (E) RUMPUS ROOM 512 SF (E) LANDSCAPED AND GRASS AREA (E) 8'H BLOCK WALL (N) 4 " A B S S E W E R L I N E , MIN . 2 % S L O P E 3'-0" 3'-6" 2'-0" 5'-0" 2' - 0 " 4' - 0 " 5'-0"5'-6" 4'-0" 4'-0" 5'-0"3'-0" 4'-0" 4'-0" FIRE SEPARATION LINE (N) 3/4" ADU #1 WATER METER (N) 3/4" ADU #2 WATER METER 2" SCHD. 80 GRAY CONDUIT, MIN. 18" BELOW GROUND 5'-0" FIRE SEPARATION LINE (N) ADU #2 748 SF19'-0" (N) ADU #1 747 SF (N) PORCH 37 SF 32'-0" (N) PORCH 180 SF (N) PORCH 142 SF SOLAR ZONE 250 SF (38.5'x6.5') SOLAR ZONE 1 125 SF (13.5'x9.25') 48'-10" 24'-6" 3'-0" 3'-0" 3'-0" 3'-0" SOLAR ZONE 2 125 SF (13.5'x9.25') 3'-0" 3'-0" ATTIC VENTILATION CALCULATION TOTAL ATTIC VENTILATION AREA SHALL NOT BE LESS THAN 1/150 OF THE ATTIC SPACE AREA. 1. ADU #1: ATTIC SPACE = 747 + 37 + 142 = 926 SF ATTIC VENTS REQUIRED = 926/150 = 6.2 SF 2. ADU #2: ATTIC SPACE = 748 + 180 = 928 SF ATTIC VENTS REQUIRED = 928/150 = 6.2 SF ===> PROVIDE 8 VENTS ON THE ADUs, OHAGINTM 14" DIAMETER ROOF VENTS (1.07 SF EACH), AS INDICATED ON ROOF PLAN HEREON PROJECT INFORMATION OWNER:ANDY PHAM TEL.:(714) 548 1937 ADD.:MAIN:1911 S EVERGREEN ST ADU #1:1907 S EVERGREEN ST ADU #2:1909 S EVERGREEN ST SANTA ANA, CA 92707 (E) UNIT A = 1,272 SF (E) UNIT 1/2 = 894 SF (E) RUMPUS ROOM = 512 SF (E) DECK = 403 SF (E) GARAGE = 603 SF (N) ADU #1 = 747 SF (EXEMPT FOR LOT COVERAGE) (N) ADU #1 PORCHES = 37 SF AND 142 SF (N) ADU #2 = 748 SF (EXEMPT FOR LOT COVERAGE) (N) ADU #2 PATIO COVER = 180 SF LOT COVERAGE = 1,272 + 512 + 603 = 2,387 SF TOTAL LIVING AREA = 1,272 + 512 + 894 + 747 + 748 = 4,173 SF LOT SIZE = 10,800 SF % COVERAGE = 2,387/10,800 = 22.1% APN = TO BE ASSIGNED BY PLANNING ZONE = R1/U FLOOD ZONE = X TYPE OF CONSTRUCTION = VB (E) UNIT'S FIRE SPRINKLER = NOT EQUIPPED APPLICABLE BUILDING STANDARDS 1. 2022 CALIFORNIA MECHANICAL CODE (CMC) 2. 2022 CALIFORNIA BUILDING CODE (CBC) 3. 2022 CALIFORNIA RESIDENTIAL CODE (CRC) 4. 2022 CALIFORNIA PLUMBING CODE (CPC) 5. 2022 CALIFORNIA ELECTRICAL CODE (CEC) 6. 2022 CALIF. ENERGY EFFICIENCY STANDARD 7. 2022 CALIF. GREEN BUILDING STANDARDS 8. CITY OF SANTA ANA ORDINANCES DRAWING INDEX A1 (N) SITE/ROOF PLAN - GENERAL NOTES SOLAR ZONE DEDICATION A2 (E) SITE/ROOF PLAN - (E) FLOOR PLAN A3 (N) ADU FLOOR PLAN A4 ELEVATION - BUILDING SECTIONS DR1-2 DRAINAGE PLAN SN-1 STRUCTURAL GENERAL NOTES S1-2 FOUNDATION PLAN - FRAMING PLAN SD1-2 STRUCTURAL DETAILS T1-4 TITLE 24 PLAN T5-6 GREEN BUILDING STANDARDS CODE SCOPE OF WORK 1. BUILD NEW DETACHED 747 SF ADU #1 (2 BEDROOM - 2 BATHROOM) WITH 37 SF AND 142 SF PORCHES 2. BUILD NEW DETACHED 748 SF ADU #2 (2 BEDROOM - 2 BATHROOM) WITH 180 SF PORCH CONSTRUCTION NOTES 1. CONSTRUCTION WORK HOURS ARE 7AM - 7PM, M-F; 9AM - 7PM, SATURDAY; NO SUNDAY OR LEGAL HOLIDAYS. 2. THERE SHALL BE NO TRENCHES OR EXCAVATIONS 5' OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND, OR OBTAIN PERMIT FROM STATE OF CA, DIVISION OF OCCUPATIONAL SAFETY AND HEALTH (CAL/OSHA). THIS PERMIT AND ANY OTHER SAFETY PERMIT SHALL BE OBTAINED PRIOR TO COMMENCE OF ANY WORK. VICINITY MAP ADU PARKING EXEMPTION NOTE PROPOSED ADU IS LOCATED WITHIN ONE-HALF MILE TO OCTA ROUTE 55 ALONG S STANDARD AVE. AT E OCCIDENTAL ST., PURSUANT TO ASSEMBLY BILL 68, NO PARKING IS REQUIRED FOR THE ADUs. GENERAL NOTES 1. ALL WORK PERFORMED SHALL COMPLY WITH THESE GENERAL NOTES (UNLESS NOTED OTHERWISE ON THESE PLANS AND SPECIFICATIONS) AND ALL THE FOLLOWING NOTES, DRAWINGS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL COORDINATE THE INTENT OF GENERAL NOTES WITH MECHANICAL, ELECTRICAL, AND PLUMBING TRADES. 2. THE GENERAL CONTRACTOR OBTAINS AND PAYS FOR ALL REQUIRED PERMITS AND ARRANGES FOR ALL REQUIRED INSPECTIONS. 3. ALL WORK SHALL COMPLY WITH LATEST EDITION OF BUILDING CODES AS ADOPTED BY THE CITY OF SANTA ANA AND ALL OTHER APPLICABLE REGULATIONS. 4. DO NOT SCALE DRAWINGS. CONTRACTOR SHALL VERIFY ALL SITES CONDITIONS, DIMENSIONS AND ELEVATION BEFORE STARTING THE WORK, AND NOTIFY THE DESIGNER OF ANY DISCREPANCY, IN WRITING, PRIOR TO PROCEEDING. 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ALL EXISTING UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSES OF REPAIR OR REPLACEMENT IN CONJUNCTION WITH THE PROSECUTION OF SUCH WORK. 6. THE CONTRACTOR SHALL DETERMINE THE LOCATION OF THE UTILITY SERVICES IN THE AREA TO BE EXCAVATED PRIOR TO THE EXCAVATION. 7. THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO SOLID WASTE, PETROLEUM BYPRODUCTS, SOIL PARTICULATE, CONSTRUCTION WASTE MATERIALS, OR WASTEWATER GENERATED ON CONSTRUCTION SITE OR BY THE CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED OR DISCHARGED INTO THE STREET, GUTTER OR STORM DRAIN SYSTEM. 8. ALL NEW ROOF MATERIALS, STUCCO AND WINDOWS SHALL MATCH EXISTING COLOR AND STYLE. EMERGENCY EGRESS NOTES 1. MIN. SET CLEAR OPENING OF 5.7 SQUARE FEET. 2. MIN. 5 SQUARE FEET FOR GRADE-FLOOR OPENINGS 3. MIN. SET CLEAR HEIGHT OF 24 INCHES. 4. WINDOW TO BOTTOM OF CLEAR OPENING SHALL BE NO MORE THAN 44 INCHES. STUCCO NOTES 1. A CORROSION RESISTANT WEEP SCREED 2" BELOW PLATE, 6" (2" FOR CONCRETE WALKWAY) ABOVE GRADE THAT ALLOWS TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING IS REQUIRED BELOW THE STUCCO AT THE FOUNDATION PLATE LINE. 2. 7/8" MIN. THICK THREE-COAT APPLICATION (SCRATCH, BROWN AND FINISH) OVER SELF-FURRING GALVANIZED WIRE LATH OVER GRADE D BUILDING PAPER AND WIRE BACKING. 3. EXTERIOR LATH: PROVIDE 2 LAYERS OF GRADE D PAPER OVER SHEATHING OR WOOD STUDS SETBACK AND PROPERTY LINE NOTE THE OWNER/CONTRACTOR SHALL CONSULT WITH A LAND SURVEYOR TO DETERMINE IF A LOT/BOUNDARY SURVEY IS NEEDED TO VERIFY SETBACKS OF EXISTING AND PROPOSED STRUCTURES WITH RESPECT TO PROPERTY LINES. IN THE EVENT THERE IS DISCREPANCY BETWEEN PROPOSAL AND FIELD MEASUREMENTS OF SETBACK, THE DESIGNER SHALL BE NOTIFIED; AND REVISION SHALL BE SUBMITTED FOR CITY APPROVAL. ELECTRICAL METER LOCATION NOTE THE CONTRACTOR SHALL CONTACT SOUTHERN CALIFORNIA EDISON (SCE) @ 800-655-4555 TO OBTAIN A NEW METER SPOT APPROVAL AND INSTALLATION INSTRUCTIONS PRIOR TO INSTALLING THE NEW METER SERVICE PANEL. LOCATION AND AMPERAGE OF NEW METER IN THIS PLAN ARE ONLY PROPOSAL AND SUBJECT TO SCE FINAL APPROVAL. SI T E P L A N RO O F P L A N SO L A R Z O N E DE D I C A T I O N GE N E R A L N O T E S OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s SHEET A1 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 LANDSCAPING LEGEND GRASS OR ACCEPTABLE DRY CLIMATE GROUND COVER POP-UP SPRINKLER NEW 5 GAL. JUNIPER BUSH (TYP. 6) NEW 1 GAL. ENCORE AZALEA (TYP. 16) FRUIT TREES ( VARIETY - MAX. 20' APART) NEW 24" BOX KING PALM OR SIMILAR, TREE SHALL BE DOUBLE-STAKED BUILDING NOTES 1. ALL CONCEALED WORK INSTALLED WITHOUT PERMITS MUST BE EXPOSED FOR INSPECTION TO THE SATISFACTION OF THE BUILDING INSPECTOR. THIS INCLUDES METHODS OF ATTACHMENT AND ALL FOOTINGS, STRUCTURAL MEMBERS, MECHANICAL, ELECTRICAL, PLUMBING AND INSULATION. 2. MECHANICAL, ELECTRICAL AND PLUMBING ARE NOT PART OF THIS PLAN REVIEW AND APPROVAL. MEP ARE SUBJECT TO BUILDING FIELD INSPECTION. FRONT YARD NOTES 1.FRONT YARD LANDSCAPING SHALL COMPLY WITH S.A.M.C. SEC. 41-240. 2.LANDSCAPING AREAS SHALL BE DESIGNED WITH AN AUTOMATIC IRRIGATION SYSTEM WITH POP-UP SPRINKLERS. DRIP, BUBBLER OR OTHER LOW GALLONAGE SYSTEMS MAY BE USED IN BUFFER AREAS AND NARROW STRIPS. 3.FRONT YARD LANDSCAPING, IF NOT PRESENT, SHALL BE RESTORED WITH LIVE VEGETATION (GRASS OR ACCEPTABLE DRY CLIMATE GROUND COVER). 4.FENCE IN FRONT YARD SHALL COMPLY WITH S.A.M.C. SEC. 41-610 AND SHALL NOT EXCEED 3' IN HEIGHT. (N) SITE/ROOF PLAN SCALE: 1/8" = 1'-0" SOLAR ZONE DEDICATION SCALE: 3/16" = 1'-0" PHOTOVOLTAIC SYSTEM NOTE 1. A MINIMUM 2.04 KWdc AND 2.05 KWdc PHOTOVOLTAIC SYSTEM (PER TITLE 24) SHALL BE INSTALLED ON THE ADU #1 AND #2, RESPECTIVELY, PRIOR TO FINAL INSPECTION SIGN-OFF. THE PV SYSTEM SHALL BE SUBMITTED UNDER A SEPARATE SUBMITTAL. 2. SOLAR PERMIT ISSUANCE IS REQUIRED PRIOR TO PERFORMING FRAMING INSPECTION. PLANNING DEPARTMENT NOTE 1. THE OWNER SHALL BE RESPONSIBLE FOR INDENTING THE PRESENCE OF ANY EASEMENTS LOCATED ON THE PROPERTY THAT MAY AFFECT THE PROJECT. 2. ALL UTILITIES SHALL BE UNDERGROUND. BUILDING SECURITY REGULATIONS FOR NEW BUILDINGS AND ADDITIONS, ALTERATIONS, AND REPAIRS WITHIN ANY TWELVE-MONTH PERIOD EXCEED FIFTY (50 %) PERCENT OF THE VALUE OF ANY EXISTING BUILDING OR STRUCTURE, EACH BUILDING OR STRUCTURE SHALL BE MADE TO CONFORM TO THE REQUIREMENTS FOR NEW BUILDINGS OR STRUCTURES AND COMPLY WITH THE BUILDING SECURITY REGULATIONS. SANTA ANA MUNICIPAL CODE CHAPTER 8, DIVISION 3. ADU SF / SFD SF RATIO 1. ADU #1 SF / SFD SF RATIO = 747/1,272 = 0.59 2. ADU #2 SF / SFD SF RATIO = 748/1,272 = 0.59 THE ADU SF / SFD SF RATIO IS FOR PARK & REC. FEE PURPOSE ONLY. THE APPLICANT IS RESPONSIBLE FOR THE GIVEN "SFR SF" OF THE EXISTING PRIMARY RESIDENCE. BUILDING SAFETY STAFF ARE NOT RESPONSIBLE FOR THE ACCURACY OF THE GIVEN "SFR SF" OF THE EXISTING RESIDENCE. HERS SPECIAL FEATURES • COOL ROOF • INSULATION BELOW ROOF DECK • NORTHWEST ENERGY EFFICIENCY ALLIANCE (NEEA) RATED HEAT PUMP WATER HEATER; SPECIFIC BRAND/MODEL, OR EQUIVALENT, MUST BE INSTALLED HERS INSPECTION FEATURES • QUALITY INSULATION INSTALLATION (QII) • INDOOR AIR QUALITY VENTILATION • MINIMUM AIRFLOW • VERIFIED EER/EER2 AND SEER/SEER2 • FAN EFFICACY WATTS/CFM • VERIFIED HEAT PUMP RATED HEATING CAPACITY • DUCT LEAKAGE TESTING Bldg # 101121984-85 APPROVALS: PLNG - F. Arias BLDG - CSG POLICE - B. Martin PUBLIC WORKS - Y. Soto RUMPUS ROOM BATH WH 24"24" VINYL WINDOW72"36" VINYL WINDOW 72 " 3 6 " V I N Y L W I N D O W 14'-0" 49'-0" 26'-6" 5'-8"6'-10" 20'-4"6'-2" 19'-4" 29'-8"GARAGE 72 " 3 6 " V I N Y L W I N D O W 72 " 3 6 " V I N Y L W I N D O W 12 ' 7 ' W O O D E N G A R A G E D O O R 12 ' 7 ' W O O D E N G A R A G E D O O R SD STORAGE (E) LANDSCAPED AND GRASS AREA (E) SURFACE TO BE RESTORED W/ LANDSCAPE (E) GARAGE 603 SF ℄(E) RUMPUS ROOM 512 SF PROPERTY LINE - 135.00' 18'-2" (E) GAS METER 12'-0" (E) GAS METER (E) GAS METER (E) 2ND FLOOR UNIT #1/2 894 SF (2 BED/1 BATH OVER (E) 1ST FLOOR UNIT #A 1,272 SF 3 BED/1 BATH S E V E R G R E E N S T 30'-0" TO CENTERLINE 4'-0"6'-0" 20'-4"10'-8" 6'-9" 20'-7" 38'-3" 32'-0" 6'-2"37'-3"3'-5"3'-5"33'-3"20'-7" 19'-4" 21'-2" 20'-1" 32'-0" 6'-9" 29'-8" 27'-0"6'-3"6'-9"37'-3"26'-6"10'-8" 31'-0"31'-0" 3'-0" PROPERTY LINE - 135.00' PR O P E R T Y L I N E - 8 0 . 0 0 ' (E) 6'H BLOCK WALL (E) WATER METER (E) POWER POLE UPPER FLOOR WALL (E) POWER POLE 18 " ( T Y P . ) 4:124:12 4:12 (E) SHED TO BE REMOVED (E) SHED TO BE REMOVED 19'-4" 29'-8" PR O P E R T Y L I N E - 8 0 . 0 0 ' 0.5:12 0.5:12 18 " ( T Y P . ) (E ) D E C K 40 3 S F 2% 2% 2% (E ) 4 - G A N G PA N E L , 30 A E A C H DECK WH DW 36"48" VINYL WINDOW 36 " 4 8 " V I N Y L W I N D O W 60 " 3 6 " V I N Y L W I N D O W 24 " 3 6 " V I N Y L W I N D O W 36 " 4 8 " V I N Y L WI N D O W 36 " 4 8 " V I N Y L WI N D O W 48 " 3 6 " V I N Y L W I N D O W 18 " 2 4 " V I N Y L WI N D O W 18 " 2 4 " V I N Y L WI N D O W 11'-6" 8'-10" 9'-11" 8'-0" 38'-3" 11'-10"3'-6"11'-8"6'-3" 17'-4"9'-8" 11'-6" 18'-9" 8'-0" ATTIC ACCESS BEDROOM 1 KITCHEN BEDROOM 2 LIVING AREA DINING AREA SD 6'-3" UL 2034/2075 RATED @ (E) UNIT CO SDUL 217 RATED @ (E) UNIT SD SD SD BATH 4-GANG PANEL, 30A EACH BEDROOM 1 DW KI T C H E N BEDROOM 2 BEDROOM 3 BATH 48"60" VINYL WINDOW 60"48" VINYL WINDOW 36 " 1 2 " V I N Y L W I N D O W 96 " 8 0 " V I N Y L S L I D I N G D O O R 60 " 4 8 " V I N Y L W I N D O W 20'-2"2'-10"10'-3" 10'-2"13'-9"9'-5" 9'-8" 9'-1" 9'-6" 10'-0" 38'-3" 9'-8" 16'-7" 12'-0" LIVING AREA 36 " 4 8 " V I N Y L W I N D O W PORCH SDUL 217 RATED @ (E) UNIT SD SD SD SD UL 2034/2075 RATED @ (E) UNIT CO CO (E ) S I T E P L A N (E ) F L O O R P L A N SHEET A2 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 (E) FLOOR PLAN - GARAGE & RUMPUS ROOM SCALE: 3/16" = 1'-0" (E) SITE/ROOF PLAN SCALE: 1/8" = 1'-0" (E) FLOOR PLAN - UNIT A SCALE: 3/16" = 1'-0" (E) FLOOR PLAN - UNIT 1/2 SCALE: 3/16" = 1'-0" CARBON MONOXIDE AND SMOKE DETECTOR NOTES SMOKE DETECTOR SHALL BE PROVIDED IN EACH SLEEPING ROOM AND AREA GIVING ACCESS TO THE SLEEPING ROOMS 1. NEW CONSTRUCTION: CO AND SMOKE DETECTORS SHALL RECEIVE THEIR PRIMARY POWER FROM BUILDING WIRING WITH BATTERY BACKUP. 2. EXISTING MAIN HOUSE: BATTERY POWERED UL 2034/2075 RATED CARBON MONOXIDE ALARM AND UL 217 RATED SMOKE ALARMS SHALL BE INSTALLED IN MARKED LOCATIONS. DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 LIVING AREA BEDROOM 1 3'-3" 9'-1" ATTIC ACCESS 30" x 30" BATH 1 BEDROOM 2 KI T C H E N 34'-2" 32'-0" 11'-6" 3'-6" 9'-0" STACKED W/D 3" HEATPUMP INDOOR UNIT IN ATTIC (N ) A C CO N D E N S E R O N 3" C O N C R E T E P A D DINING AREA 13'-0" WH 20 0 A SU B - P A N E L PORCH 2'-6"13'-0" 3'-8" 2'-0" 5'-6" 5'-0" 10'-5" 30" 1,024 SI2' - 5 " 1' - 4 " 2'-6" BATH 2 30" 1,024 SI2' - 5 " 1' - 4 " 2'-6" 14'-1" 3" PORCH 9'-8" 14'-8" 17'-4" S-B WR-GFCI EGRESS WINDOW HOOD VENT THROUGH ROOF, 400 CFM MIN., HOOD SHALL COMPLY W/ ASHRAE 62.2(C) $3D$$3 40 AMP. WR-GFCI $$3 $3 $3 AFCI (TYP.) AFCI (TYP.) AFCI (TYP.) $D SD SD $D GRAB BAR REINFORCEMENT, MIN. 2x8 LUMBER, 32"-39.25" ABOVE F.F. (TYP.) $VS $ $VS $ CO SD $ 30 AMP. AFCI (TYP.) GFCI (TYP.) $$ 50 AMP. MAX. 48" MEASURED FROM TOP, MIN. 15" MEASURED FROM BOTTOM OF BOX ABOVE F.F. (TYP.) S-B ES S 6 0 A SU B - P A N E L 30 AMP. EGRESS WINDOW 30 AMP. $3D WR-GFCI WR-GFCI WR-GFCI WR-GFCI PHOTO-ELECTRIC TYPE LIVING AREA BEDROOM 1 PATIO COVER 9'-4" 9'-8" 8'-10"8'-10" 10'-10" 25'-9" 5'-7" ATTIC ACCESS 30" x 30" BATH 1 BEDROOM 2 KITCHEN 12'-0" 5'-5" 30" 1,024 SI 30" 1,024 SI 2'-6"10'-7"10'-3" 7'-10" STACKED W/D1' - 7 " 1' - 4 " HEATPUMP INDOOR UNIT IN ATTIC 1' - 1 1 " 1' - 4 " BATH 2 DINING AREA WH AD U # 1 20 0 A P A N E L AD U # 2 20 0 A P A N E L 48'-10" 7'-10" 3" 5'-0" 3'-0" (N ) A C CO N D E N S E R O N 3" C O N C R E T E P A D 2'-7" 3" 6'-9" 3'-3" 19'-0" S-A UFER (SEPARATE 1/2" DIA. REBAR, 20' LONG AT BOTTOM OF NEW FOOTING) SD AFCI (TYP.) GFCI (TYP.) GRAB BAR REINFORCEMENT, MIN. 2x8 LUMBER, 32"-39.25" ABOVE F.F. (TYP.) 30 AMP. WR-GFCI MAX. 48" MEASURED FROM TOP, MIN. 15" MEASURED FROM BOTTOM OF BOX ABOVE F.F. (TYP.) $D $D $ 40 AMP. WR-GFCI $3 $ $3D $ $3 $D AFCI (TYP.)AFCI (TYP.) AFCI (TYP.) SD SD $VS$ $$50 AMP. 30 AMP. $ HOOD VENT THROUGH ROOF, 400 CFM MIN., HOOD SHALL COMPLY W/ ASHRAE 62.2(C) S-A AD U # 2 6 0 A E S S SU B - P A N E L EGRESS WINDOW EGRESS WINDOW $VS $ 30 AMP. $3 WR-GFCIWR-GFCI WR-GFCI CO SD PHOTO-ELECTRIC TYPE (N) ADU #1 FLOOR PLAN SCALE: 1/4" = 1'-0" NEW WALL, 2x4 STUDS @ 16" O.C. U.N.O. EXISTING STUD WALL WALL LEGEND CARBON MONOXIDE AND SMOKE DETECTOR NOTES SMOKE DETECTOR SHALL BE PROVIDED IN EACH SLEEPING ROOM AND AREA GIVING ACCESS TO THE SLEEPING ROOMS 1. NEW CONSTRUCTION: CO AND SMOKE DETECTORS SHALL RECEIVE THEIR PRIMARY POWER FROM BUILDING WIRING WITH BATTERY BACKUP. 2. EXISTING MAIN HOUSE: BATTERY POWERED UL 2034/2075 RATED CARBON MONOXIDE ALARM AND UL 217 RATED SMOKE ALARMS SHALL BE INSTALLED IN MARKED LOCATIONS. ELECTRICAL NOTES 1.PROVIDE ONE 20 AMP. CIRCUIT FOR BATHROOM OUTLETS. SUCH CIRCUIT SHALL HAVE NO OTHER OUTLETS. 2.PROVIDE 2 DEDICATED GENERAL APPLIANCE CIRCUITS TO THE KITCHEN AREA. 3.ALL INSTALLED LUMINAIRES MUST BE HIGH EFFICACY IN ACCORDANCE WITH TABLE 150.0-A. 4.ALL RECEPTACLES IN BATHROOMS SHALL BE G.F.C.I. 5.SERVICE PANEL/METER UPGRADE OR NEW: OBTAIN LOCATION APPROVAL FROM THE ELECTRICAL PROVIDER. 6.ALL BRANCH CIRCUITS SUPPLYING RECEPTACLE OUTLETS IN KITCHENS, BEDROOMS, FAMILY ROOMS, DINING ROOMS, LIVING ROOMS, PARLORS, DENS, SUNROOMS, HALLWAYS, CLOSETS AND SIMILAR ROOMS/AREAS SHALL BE PROTECTED BY AN ARC-FAULT CIRCUIT INTERRUPTER (AFCI). 7.NON-HIGH EFFICACY LUMINAIRES SHALL BE SWITCHED ON A SEPARATE CIRCUIT FROM HIGH EFFICACY LUMINAIRES. 8.ELECTRICAL OUTLET BOXES IN OPPOSITE FACES OF SEPARATION WALLS SHALL BE SEPARATED HORIZONTALLY BY 24" . BACK AND SIDES OF BOXES TO BE SEALED WITH 1/8" RESILIENT SEALANT AND BACKED WITH 2" MIN. MINERAL FIBER INSULATION. 9.ALL RECEPTACLE OUTLETS SHALL BE LISTED AS TAMPER-RESISTANT OUTLETS. 10.ALL OUTDOOR LIGHTING MOUNTED TO A RESIDENTIAL BUILDING SHALL BE HIGH EFFICACY LIGHTING OR CONTROLLED BY A PHOTOCELL AND MOTION SENSOR COMBINATION. PLUMBING NOTES 1.BATH FAN SHALL BE CONTROLLED BY HUMIDISTAT WITH ADJUSTMENT BETWEEN A RELATIVE HUMIDITY RANGE 50-80%. 2.SHOWER WALLS ABOVE BATHTUB WITH SHOWER HEADS SHALL BE FINISHED WITH A SMOOTH, NON-ABSORBENT SURFACE TO A HEIGHT NOT LESS THAN 6' ABOVE FLOOR. 3.SHOWER COMPARTMENT SHALL BE MINIMUM 1,024 SQ. IN. AND SHALL BE CAPABLE OF ENCOMPASSING A 30 IN. CIRCLE. 4.PROVIDE A 12"x12" MINIMUM ACCESS PANEL TO BATHTUB TRAP CONNECTION UNLESS PLUMBING IS WITHOUT SLIP JOINTS (CPC 405.2). 5.ALL TOILETS SHALL BE 1.28 GPF, SHOWERHEADS 2.0 GPM, AND FAUCETS 1.2 GPM, KITCHEN FAUCET 1.8 GPM. 6.FOR SHOWERS OR TUB-SHOWERS MAX. TEMPERATURE OF 120 DEGREE TO BE PROVIDED BY THE USE CONTROL VALVE PRESSURE BALANCE OR THERMOSTATIC MIXING VALVE. 7.ALL GLAZING IN ALL DOORS, BATH/SHOWER ENCLOSURES MUST BE IDENTIFIED BY A LABEL AS A SAFETY GLAZING. 8.WALL COVERING IN SHOWERS AND TUBS TO BE CEMENT PLASTER OR TILE EQUAL TO 72" ABOVE DRAIN. ENCLOSURES MUST BE OF APPROVED SAFETY GLAZING AND DOORS MUST SWING OUT OF SHOWERS. WINDOWS IN ENCLOSURE WALLS SHALL BE LABELED SAFETY GLAZING WHEN LESS THAN 60" ABOVE THE DRAIN, TYPICAL FOR ALL BATHROOMS. 9.GREEN BOARD GYPSUM OR WATER RESISTANT GYPSUM BOARD SHALL NOT BE USED AS BACKING FOR CEILING FINISH INSIDE BATHROOM DUE TO CONDENSATION OR VAPOR. 10.WATER HEATER: SIZE PER TITLE 24 WITH VENT THROUGH OUTSIDE. PROVIDE P&T RELIEF VALVE ON WATER HEATER. PROVIDE SMITTY PAN WITH DRAIN INSULATION/CLEARANCE PER MANUFACTURER SPECS. WATER HEATER TANK (IF USED) MUST BE ADEQUATELY BRACED TO RESIST SEISMIC FORCES: PROVIDE 2 STRAPS, 1 STRAP AT TOP 1/3 OF TANK AND 1 STRAP AT BOTTOM 1/3 OF THE TANK. 11.PLUMBING VENT TERMINATIONS SHALL BE AT LEAST 10' FROM FRESH AIR INTAKE OR VENTILATION. 12.B-VENTS SHALL TERMINATE AT LEAST 4' FROM FRESH AIR INTAKE OR VENTILATION. WINDOW SCHEDULE WINDOWS' U-FACTOR = 0.3 AND SHGC = 0.23 PER TITLE 24 REPORT A 48"x48" SLIDING GLASS W/D, DUAL GLAZING, VINYL FRAME B 60"x48" SLIDING GLASS W/D, DUAL GLAZING, VINYL FRAME C 36"x48" SLIDING GLASS W/D, DUAL GLAZING, VINYL FRAME D 36"x36" SLIDING GLASS W/D, DUAL GLAZING, VINYL FRAME E 36"x18" S.L. FROSTED GLASS W/D, DUAL GLAZING, VINYL FRAME, TEMPERED GLASS F 30"x18" S.L. FROSTED GLASS W/D, DUAL GLAZING, VINYL FRAME, TEMPERED GLASS DOOR SCHEDULE 1 30"x80" HOLLOW CORE DOOR 2 36"x80" HOLLOW CORE DOOR 3 36"x80" SOLID CORE ENTRY DOOR W/ TEMPERED GLASS 4 36"x80" EXTERIOR RATED SOLID FRENCH DOOR 5 96"x80" CLOSET SLIDING DOOR 6 72"x80" CLOSET SLIDING DOOR 7 60"x80" CLOSET SLIDING DOOR 8 24"x80" EXTERIOR RATED DOOR WITH LOUVERS DETAILED HEREON BATHROOM NOTE CEMENT, FIBER CEMENT, FIBER-MAT REINFORCED CEMENT, GLASS MAT GYPSUM OR FIBER-REINFORCED GYPSUM BACKERS SHALL BE USED AS A BASE FOR WALL TILE IN TUB AND SHOWER AREAS AND WALL AND CEILING PANELS IN SHOWER AREAS. (N ) A D U FL O O R P L A N SHEET A3 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 ELEC. BOX HEIGHT N.T.S. AGING-IN-PLACE NOTES A. REINFORCEMENT FOR GRAB BARS - AT LEAST ONE BATHROOM ON THE ENTRY LEVEL SHALL BE PROVIDED WITH REINFORCEMENT INSTALLED IN ACCORDANCE WITH CRC R327.1. 1) REINFORCEMENT SHALL BE SOLID LUMBER OR OTHER CONSTRUCTION MATERIALS APPROVED BY THE ENFORCING AGENCY. 2) REINFORCEMENT SHALL NOT BE LESS THAN 2 BY 8 INCH NOMINAL LUMBER (1-1/2 INCH BY 7-1/4 INCH ACTUAL DIMENSION) OR OTHER CONSTRUCTION MATERIAL PROVIDING EQUAL HEIGHT AND LOAD CAPACITY. REINFORCEMENT SHALL BE LOCATED BETWEEN 32 INCHES AND 39-1/4 INCHES ABOVE THE FINISHED FLOOR, FLUSH WITH THE WALL FRAMING. 3) WATER CLOSET REINFORCEMENT SHALL BE INSTALLED ON BOTH SIDE WALLS OF THE FIXTURE, OR ONE SIDE WALL AND THE BACK WALL. 4) SHOWER REINFORCEMENT SHALL BE CONTINUOUS WHERE WALL FRAMING IS PROVIDED. 5) BATHTUB AND COMBINATION BATHTUB/SHOWER REINFORCEMENT SHALL BE CONTINUOUS ON EACH END OF THE BATHTUB AND THE BACK WALL. ADDITIONALLY, BACK WALL REINFORCEMENT FOR A LOWER GRAB BAR SHALL BE PROVIDED WITH THE BOTTOM EDGE LOCATED NO MORE THAN 6 INCHES ABOVE THE BATHTUB RIM. 6) WHERE THE WATER CLOSET IS NOT PLACED ADJACENT TO A SIDE WALL CAPABLE OF ACCOMMODATING A GRAB BAR, THE BATHROOM SHALL HAVE PROVISIONS FOR INSTALLATION OF FLOOR-MOUNTED, FOLDAWAY OR SIMILAR ALTERNATE GRAB BAR REINFORCEMENTS APPROVED BY THE ENFORCING AGENCY. 7) REINFORCEMENT SHALL NOT BE REQUIRED IN WALL FRAMING FOR PRE-FABRICATED SHOWER ENCLOSURES AND BATHTUB WALL PANELS WITH INTEGRAL FACTORY- INSTALLED GRAB BARS OR WHEN FACTORY-INSTALLED REINFORCEMENT FOR GRAB BARS IS PROVIDED. 8) SHOWER ENCLOSURES THAT DO NOT PERMIT INSTALLATION OF REINFORCEMENT AND/OR GRAB BARS SHALL BE PERMITTED, PROVIDED REINFORCEMENT FOR INSTALLATION OF FLOOR-MOUNTED GRAB BARS OR AN ALTERNATE METHOD IS APPROVED BY THE ENFORCING AGENCY. 9) BATHTUBS WITH NO SURROUNDING WALLS, OR WHERE WALL PANELS DO NOT PERMIT THE INSTALLATION OF REINFORCEMENT SHALL BE PERMITTED, PROVIDED REINFORCEMENT FOR INSTALLATION OF FLOOR-MOUNTED GRAB BARS ADJACENT TO THE BATHTUB OR AN ALTERNATE METHOD IS APPROVED BY THE ENFORCING AGENCY. 10) REINFORCEMENT OF FLOORS SHALL NOT BE REQUIRED FOR BATHTUBS AND WATER CLOSETS INSTALLED ON CONCRETE SLAB FLOORS. B. DOCUMENTATION FOR GRAB BAR REINFORCEMENT - INFORMATION AND/OR DRAWINGS IDENTIFYING THE LOCATION OF GRAB BAR REINFORCEMENT SHALL BE PLACED IN THE OPERATION AND MAINTENANCE MANUAL IN ACCORDANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS CODE, CHAPTER 4, DIVISION 4.4. (CRC R327.1.1.1) C. ELECTRICAL RECEPTACLE OUTLET, SWITCH AND CONTROL HEIGHTS - ELECTRICAL RECEPTACLE OUTLETS, SWITCHES AND CONTROLS (INCLUDING CONTROLS FOR HEATING, VENTILATION AND AIR CONDITIONING) INTENDED TO BE USED BY OCCUPANTS SHALL BE LOCATED NO MORE THAN 48 INCHES MEASURED FROM THE TOP OF THE OUTLET BOX AND NOT LESS THAN 15 INCHES MEASURED FROM THE BOTTOM OF THE OUTLET BOX ABOVE THE FINISH FLOOR. (CRC R327.1.2). EXCEPTIONS: 1) DEDICATED RECEPTACLE OUTLETS; FLOOR RECEPTACLE OUTLETS; CONTROLS MOUNTED ON CEILING FANS AND CEILING LIGHTS; AND CONTROLS LOCATED ON APPLIANCES. 2) RECEPTACLE OUTLETS REQUIRED BY THE CALIFORNIA ELECTRICAL CODE ON A WALL SPACE WHERE THE DISTANCE BETWEEN THE FINISHED FLOOR AND A BUILT-IN FEATURE ABOVE THE FINISH FLOOR, SUCH AS A WINDOW, IS LESS THAN 15 INCHES. D. DOORBELL BUTTONS - DOORBELL BUTTONS OR CONTROLS, WHEN INSTALLED, SHALL NOT EXCEED 48 INCHES (1219.2 MM) ABOVE EXTERIOR FLOOR OR LANDING, MEASURED FROM THE TOP OF THE DOORBELL BUTTON ASSEMBLY. WHERE DOORBELL BUTTONS INTEGRATED WITH OTHER FEATURES ARE REQUIRED TO BE INSTALLED ABOVE 48 INCHES (1219.2 MM) MEASURED FROM THE EXTERIOR FLOOR OR LANDING, A STANDARD DOORBELL BUTTON OR CONTROL SHALL ALSO BE PROVIDED AT A HEIGHT NOT EXCEEDING 48 INCHES (1219.2 MM) ABOVE EXTERIOR FLOOR OR LANDING, MEASURED FROM THE TOP OF THE DOORBELL BUTTON OR CONTROL. (CRC R327.1.4) WATER HEATER - DRYER - F.A.U. DOOR DETAIL N.T.S. SD LEGEND GFCI RECEPTACLE WR GFCI WEATHER RESISTANT RECEPTACLE TAMPER RESISTANT RECEPTACLE, 120V SINGLE PHASE, 20A, CONTROLLED BY ARC-FAULT CIRCUIT INTERRUPTER (AFCI) 240V DEDICATED OUTLET, AMPERAGE AS INDICATED IN PLAN CEILING-MOUNT RECESS LIGHT OUTDOOR WALL-MOUNT LIGHT FIXTURE W/ PHOTOCELL & MOTION SENSOR $LIGHT SWITCH WITH DIMMER (D) WHERE INDICATED $3 3-WAY LIGHT SWITCH WITH DIMMER (D) WHERE INDICATED $vs VACANCY SENSOR LIGHT SWITCH $W/D WASHER/DRYER DISCONNECT SWITCH, 20A, INSTALL PER MANU. SPECS. EXHAUST FAN (100 CFM MINIMUM) W/ HUMIDITY CONTROL IN-SINK DISPOSAL AIR REGISTER ON CEILING SMOKE DETECTOR CARBON MONOXIDE DETECTOR 4" DRYER VENT W/ DAMPER, TERMINATED 30" ABOVE F.F. ON OUTSIDE WALL 4" DRYER EXHAUST VENT W/ APPROVED WALL STRAP, TERMINATED ABOVE ROOF THROUGH APPROVED FLASHING, VENT 14' LONG MAX., 2 ELBOWS MAX. W/H 240V-50 GAL. WATER HEATER TANK, RHEEMTM MODEL XE50T10H22U W CLOTHES WASHER D CLOTHES DRYER HOSE BIB WITH ANTI-SIPHON VALVE AIR RETURN ON CEILING ROOF-MOUNT ATTIC VENT IAQ FAN (PER TITLE 24), 80 CFM MINIMUM CO 18" 18" PER PLAN 100 SQ. IN. MIN. ON EACH LOUVER @ TOP AND BOTTOM 80" 15" MIN. 48" MAX. F.F. (N) ADU #2 FLOOR PLAN SCALE: 1/4" = 1'-0" DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 2x6 C.J. @ 16" O.C. (N) FOUNDATION (PER PLAN) 2x6 R.R. @ 16" O.C. 2x8 RIDGE 9'-0" CEILING HEIGHT 8" MIN. (N) 5" CONC. SLAB 12 4 WHERE INDICATED 7 SD-1 1 SD-1 6 SD-1 9 SD-1 2x4 STUD @ 16" O.C. (TYP.) R15 INSULATION WHERE INDICATED 7 SD-1 1 SD-1 6 SD-1 7/8" STUCCO OVER SHEARWALL WHERE OCCURS 10 SD-1R30 INSULATION 17 SD-1 2 SD-1 10 SD-1 13'-0" R15 INSULATION 11'-6" COOL ROOF REQUIRED, CRRC # 0676-0139, GAFTM CLASS A ASPHALT SHINGLES (ICC# ESR-1475) W/ DOUBLE LAYERS OF 30 LB. UNDERLAYMENT ON RADIANT BARRIER SHEATHING 2x8 C.J. @ 16" O.C. (N) FOUNDATION (PER PLAN) 2x6 R.R. @ 16" O.C. 2x8 RIDGE 9'-0" CEILING HEIGHT 8" MIN. (N) 5" CONC. SLAB 12 4 WHERE INDICATED 7 SD-1 1 SD-1 6 SD-1 9 SD-1 WHERE INDICATED 7 SD-1 1 SD-1 6 SD-1 7/8" STUCCO OVER SHEARWALL WHERE OCCURS 10 SD-1R30 INSULATION 13 SD-1 3 SD-1 14 SD-1 5'-7" R15 INSULATION COOL ROOF REQUIRED, CRRC # 0676-0139, GAFTM CLASS A ASPHALT SHINGLES (ICC# ESR-1475) W/ DOUBLE LAYERS OF 30 LB. UNDERLAYMENT ON RADIANT BARRIER SHEATHING 2x4 STUD @ 16" O.C. (TYP.) 13'-5" 4x6 HEADER D.F. #1 WINDOW (PER PLAN) 5/8" TYP. X DRYWALL TO ROOF SHEATHING 22'-8" 12 4 22'-8"22'-8" (E) LIGHT BROWN SHINGLE ROOF 19'-9" FINISH FLOOR FINISH FLOOR FINISH FLOOR FINISH FLOOR FINISH FLOOR FINISH FLOOR 12 4 22'-8" 9'-2"9'-2"9'-2" FINISH FLOOR FINISH CURB 9'-2" FINISH GRADE FINISH GRADE FINISH FLOOR FINISH CURB FINISH GRADEFINISH GRADE 18"18"18"18" FINISH FLOOR 12 4 12 4 12 .5 12 .5 12 .5 12 .5 OHAGINTM ATTIC VENTS 14" DIA., 1.07 SF (TYP.) STUCCO TO MATCH EXISTING UNIT IN COLOR & TEXTURE NEW FASCIA & ROOF TO MATCH EXISTING HOUSE IN COLOR AND SIZE COOL ROOF REQUIRED, CRRC # 0676-0139, GAFTM CLASS A ASPHALT SHINGLES (ICC# ESR-1475) W/ DOUBLE LAYERS OF 30 LB. UNDERLAYMENT ON RADIANT BARRIER SHEATHING 2'-8"2'-8"FINISH FLOORFINISH FLOORFINISH FLOOR 12 4 12 4 12 4 12 4 5'-8" FINISH GRADE FINISH GRADE 12"12"12"12" 5'W x 3'D EXTERIOR LANDING (3" DROP FROM DOOR THRESHOLD, 2% SLOPE) EXTERIOR LANDING (3" DROP FROM DOOR THRESHOLD, 2% SLOPE) 13'-4"13'-4"13'-4"9'-0" CEILING HEIGHT 8" MIN. 2'-8"2'-8" FINISH GRADE FINISH GRADE FINISH FLOOR FINISH FLOOR FINISH FLOOR FINISH FLOOR 5'-8" 12'-7" 14'-3"14'-3" 9'-0" CEILING HEIGHT 8" MIN. 12"12"12"12" EXTERIOR LANDING (3" DROP FROM DOOR THRESHOLD, 2% SLOPE) 12 4 12 4 12 412 4 OHAGINTM ATTIC VENTS 14" DIA., 1.07 SF (TYP.) STUCCO TO MATCH EXISTING UNIT IN COLOR & TEXTURE NEW FASCIA & ROOF TO MATCH EXISTING HOUSE IN COLOR AND SIZE COOL ROOF REQUIRED, CRRC # 0676-0139, GAFTM CLASS A ASPHALT SHINGLES (ICC# ESR-1475) W/ DOUBLE LAYERS OF 30 LB. UNDERLAYMENT ON RADIANT BARRIER SHEATHING EXTERIOR LANDING (3" DROP FROM DOOR THRESHOLD, 2% SLOPE) WALL OPENING CALCULATION: WALL AREA = 19'x9' = 171 SF WALL OPENING = 4'x4' = 16 SF % OPENING = 16/171 = 9.3% < 25% WALL OPENING CALCULATION: WALL AREA = 48.8'x9' = 439 SF WALL OPENING = 3'x3' + 3'x6.7' + 4'x4' + 7'x8.25' = 103 SF % OPENING = 103/439 = 23.5% < 25% EL E V A T I O N BU I L D I N G SE C T I O N S SECTION S-A SCALE: 3/8" = 1'-0" SHEET A4 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 SECTION S-B SCALE: 3/8" = 1'-0" (N) ADU #1 - NORTH ELEVATION SCALE: 1/8" = 1'-0" (N) ADU #1 - SOUTH ELEVATION SCALE: 1/8" = 1'-0" (N) ADU #1 - WEST ELEVATION SCALE: 1/8" = 1'-0" (N) ADU #1 - EAST ELEVATION SCALE: 1/8" = 1'-0" (E) GARAGE & RUMPUS ROOM - SOUTH ELEVATION SCALE: 1/8" = 1'-0" WINDOW NOTE NEW WINDOWS SHALL BE WHITE VINYL WITH NAILING FLANGE, FRAME FINISH FLUSHED WITH STUCCO. WINDOWS AND TRIMS SHALL MATCH BETWEEN (E) UNIT AND (N) ADU. ADDRESS NUMBER NOTE 1. THE ADDRESS NUMBER SHALL BE ARABIC NUMBERS OR ALPHABETICAL LETTERS, NUMBERS SHALL NOT BE SPELLED OUT. 2. EACH CHARACTER SHALL BE NOT LESS THAN 4" IN HEIGHT WITH A STROKE WIDTH OF NOT LESS THAN 0.5". ELEVATION NOTE ALL EXTERIOR FINISHES TO MATCH BETWEEN EXISTING MAIN HOUSE AND NEW UNITS, INCLUDING TRIMS, COLORS, ROOFS, WINDOWS, DOORS, SIDING, ETC. (N) ADU #2 - NORTH ELEVATION SCALE: 1/8" = 1'-0" (N) ADU #2 - SOUTH ELEVATION SCALE: 1/8" = 1'-0" (N) ADU #2 - WEST ELEVATION SCALE: 1/8" = 1'-0" (N) ADU #2 - EAST ELEVATION SCALE: 1/8" = 1'-0" (E) UNIT A AND 1/2 - SOUTH ELEVATION SCALE: 1/8" = 1'-0" (E) GARAGE & RUMPUS ROOM - NORTH ELEVATION SCALE: 1/8" = 1'-0" (E) GARAGE & RUMPUS ROOM - EAST ELEVATION SCALE: 1/8" = 1'-0" (E) GARAGE & RUMPUS ROOM - WEST ELEVATION SCALE: 1/8" = 1'-0" (E) UNIT A AND 1/2 - EAST ELEVATION SCALE: 1/8" = 1'-0" (E) UNIT A AND 1/2 - NORTH ELEVATION SCALE: 1/8" = 1'-0" (E) UNIT A AND 1/2 - WEST ELEVATION SCALE: 1/8" = 1'-0" DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 (E) GAS METERS (E) CONCRETE WALKWAY (E) 2-STORY RESIDENCE (F.F. = 11.11) (9.58 TC) (9.02 FL) (10.00 TC) (9.40 FL) (ASSUMED ELEVATION) (E) POWER POLE 2 2' - 6 " 2' - 6 " 4'-0" 4'-0" 38'-3" 9'-9" (E) GARAGE ℄ PROPERTY LINE - 135.00' S E V E R G R E E N S T PROPERTY LINE - 135.00' PR O P E R T Y L I N E - 8 0 . 0 0 ' (E) WATER METER PR O P E R T Y L I N E - 8 0 . 0 0 ' (E) DRIVEWAY AND IMPERVIOUS SURFACE (E) RUMPUS ROOM (F.F. = 10.85) (E) LANDSCAPED AND GRASS AREA (E) POWER POLE (E) 2-STORY RESIDENCE (F.F. = 11.11) (E) GARAGE ℄ PROPERTY LINE - 135.00' S E V E R G R E E N S T PROPERTY LINE - 135.00' PR O P E R T Y L I N E - 8 0 . 0 0 ' PR O P E R T Y L I N E - 8 0 . 0 0 ' (N) PORCH (N) PATIO COVER (N) PORCH (E) RUMPUS ROOM (F.F. = 10.85) (E) LANDSCAPED AND GRASS AREA (N) ADU #2 F.F. = 11.55 PAD = 11.13 i=1% FL i= 1 % F L (N) ADU #1 F.F. = 11.55 PAD = 11.13 i= 1 % F L i= 0 . 5 % F L i= 0 . 5 % F L i=0.5% FL i=1% FL i=0.5% FLi=0.5% FL 2% MIN 2% MIN 2% MIN 5% MIN 2% MIN 5% MIN 2% MIN 2% MIN 2% M I N 2% M I N 5% M I N 2% M I N 2% M I N 2% M I N 2% M I N 2% M I N 2% M I N 2% M I N 2% MIN 2% MIN HAG 10.89 FS 10.84 FL HP HAG 11.22 FS 11.17 FL HP (E) DRIVEWAY AND IMPERVIOUS SURFACE (E) LANDSCAPED AND GRASS AREA (E) GAS METERS (E) POWER POLE (E) WATER METER (E) POWER POLE 1 1 2'-6" 2'-6" 19'-0" 7'-10"41'-0"4'-0"4'-0"24'-6"9'-8"4'-0"4'-0"20'-4"10'-8" 20'-7"40'-0"74'-5" GENERAL GRADING NOTES 1.All grading shall comply with the latest CBC Chapters 18 and 33, and Appendix J and the Santa Ana Municipal Code. 2.Grading shall not be started without first notifying the City Grading Inspector. A pre-grading meeting on the site is required before starting of grading with the following people present: Grading Contractor, Design Civil Engineer, Geotechnical Engineer, Grading Inspector and when required, the Archaeologist and Paleontologist. The required inspections for grading will be explained at this meeting. 3.An approved copy of the grading plans shall be on the permitted site while work is in progress. 4.The Design Civil Engineer shall be available during the grading to verify compliance with the plans, specifications, code and any special conditions of the permit within his purview. 5.The Geotechnical Engineer shall perform periodic inspections and submit a complete report and map upon completion of the rough grading. The compaction report and approval from the Geotechnical Engineer shall indicate the type of field testing performed. Each test shall be identified with the method of obtaining the in-place density, whether sand cone or drive ring, and shall be so noted for each test. Sufficient maximum density determinations shall be performed to verify the accuracy of the maximum density curves by the field technician. 6.Cut and fill slopes shall be no steeper than 2 foot horizontal to 1 foot vertical (2:1) except where specifically approved otherwise. 7.Fills shall be compacted throughout to a minimum of 90% relative density. Aggregate base for asphaltic areas shall be compacted to minimum of 95% relative density. Maximum density shall be determined by uniform building code standard No. 70-1 or approved equivalent, and field density by uniform code standard no. 70-2 or approved equivalent. 8.The Contractor shall not create any trench or excavation 5-feet or more without the necessary permit from the State of California Division of Industrial Safety. 9.All cut slopes shall be investigated both during and after grading by the Geotechnical Engineer to determine if any slope stability problem exists. Should excavation disclose any geological hazards or potential geological hazards, the Geotechnical Engineer shall submit a recommended treatment to the City Engineer for approval. 10.The permittee is responsible for dust control measures. Water active sites at least twice daily. 11.The locating and protection of all existing utilities is the responsibility of the permittee. 12.Grading operations, including maintenance of equipment, within one-half (1/2) mile of a structure of human occupancy shall not be conducted between the hours of 8:00 p.m. and 7:00 a.m. on weekdays, including Saturday, or any time on Sunday or a federal holiday. (City of Santa Ana Municipal Code Section 18-314) 13.The permittee shall give reasonable notice to the owner of adjoining lands and buildings prior to beginning excavations, which may affect the lateral and subjacent support of the adjoining property. The notice shall state the intended depth of excavation and when excavation commences. The adjoining owner shall be allowed at least 30 days and reasonable access on the permitted property to protect his structure, if he so desires, unless otherwise protected by law. 14.All existing drainage courses through the site shall remain open to handle the storm water; however, in any case, the permittee shall be held liable for any damage due to obstructing natural drainage patterns. 15.Approved erosion protection devices shall be provided and maintained during the rainy season and shall be in place at the end of each day's work. Proper erosion control measures must be shown on the plans. 16.Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the sites. Discharges of material other than storm water are allowed only when necessary for performance and completion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in a quantity reportable under Federal Regulations 40 CFR 117 and 302. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants, and hydraulic radiator or battery fluids; fertilizers, vehicles/equipment wash water and concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment steam cleaning or chemical degreasing; and superchlorinated potable water line flushings. During construction, disposal of such materials should occur in a specified and controlled temporary area on-site, physically separated from potential storm water run-off, with ultimate disposal in accordance with local, state, and federal requirements. 17.De-watering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited. Dewatering of non-contaminated groundwater requires a National Pollutant Discharge Elimination System (NPDES) permit from the respective State Regional Water Quality Control Board. 18.All dirt, sand, mud, or debris deposited or spilled upon public streets during any grading, hauling, or export operations shall be immediately cleaned up by the Developer, his Contractor, Subcontractors, or agents to the satisfaction of the City Engineer. Failure to do so will be cause for stopping all such grading, hauling, or export work by the City until such time as the streets are cleaned. 19.All trucks hauling dirt, sand, oil, or other loose materials are to be covered or should maintain a least two feet of freeboard in accordance with the requirements of CVC Section 23114. 20.Contractor is responsible for the repair of all damages to public properties that are caused by the work on-site. Repair must be completed to the satisfaction of the City Engineer. 21.Minimum asphalt pavement sections shall be: 3"AC/6"AB - parking aisles 4"AC/8"AB - drives [commercial] 4"AC/12"AB - drives [industrial] 3" A.C. over 4" A.B. - Parking Stalls [multi-family] 3" A.C. over 8" A.B. - Drive aisles [multi-family] 22.Earthwork Volumes: Cut: 12 cubic yards Fill: 18 cubic yards Net: 6 cubic yards 23.If the net volumes exceed 500 cubic yards, the Contractor must submit a haul truck route to the city for approval. Haul route shall include the location of borrow and/or dispersal site, all streets included in the route, the proposed staging area and the maximum gross weight of the trucks when loaded. 24.Submit an 8 ½" x 11" haul route map of appropriate scale which indicates the location of the project site, showing streets and direction of hauling up to and including the end of the route. 25.Pursuant to Assembly Bill 3019, no excavation permit is valid unless the contractor contacts and obtains an Inquiry I.D. number from "Underground Service Alert" (1-800-422-4133) at least two working days prior to commencing excavation. 26.Separate permits must be obtained from the City Building and Safety Division for the construction of retaining walls, light poles, trash enclosures, on-site plumbing and all building structures. 27.All fonts on plans should be a minimum of 0.1". EROSION AND SEDIMENT CONTROL NOTES 1.All work shall be in accordance with the erosion control plans, the project's Storm Water Pollution Prevention Plan (SWPPP), and the recommendations of soils report, if available. 2.Erosion control measures shall be in place at the end of each working day whenever the daily rainfall probability exceeds 40%. 3.Equipment and workers for emergency work shall be made available at all times during the rainy season. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of temporary erosion control devices at all time. 4.Controls shall be set up and maintained as construction proceeds. Adjustments to the erosion control plans are allowable as required and approved by city. 5.All erosion and sediment control measures shall implement structural and nonstructural Best Management Practices (BMPs) in conformance with the guidelines of the California Storm Water BMP Handbooks. 6.After a rainstorm, all sediment and debris shall be removed from streets, berms and desilting basins. Any graded slope surface protection measures damaged during a rainstorm shall be immediately repaired. 7.The permittee and contractor shall be responsible and shall take necessary precautions to prevent trespass onto areas where impounded water created a hazardous condition. BENCH MARK BASIS OF BEARING REVISIONS OWNER/DEVELOPER APPROVAL REV. # DATE BY DESCRIPTION ANDY PHAM TEL.: (714) 548 1937 8732 DUDMAN DR GARDEN GROVE, CA 92841 BEN PHAN, P.E. CE# 57550 EXP. 12/31/2025 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL.: (714) 251 4537 BENPHANCONSULTANT@GMAIL.COM DRAWN BY:ALBERT LUU CHECKED BY:BEN PHAN PREPARED UNDER THE SUPERVISION OF: BEN PHAN CE NO. 57550, EXP. 12/31/2025 SHEET 1 OF 2 ANDY PHAM 1907-1909-1911 S EVERGREEN ST SANTA ANA, CA 92707 ESTIMATE OF EARTHWORK QUANTITIES CUT = 12 C.Y. FILL = 18 C.Y. SITE DATA SITE ACREAGE:0.248 ACRE (10,800 SF) UNDISTURBED AREA:5,951 SF (55.1%) DISTURBED AREA:4,849 SF (44.9%) TOTAL LANDSCAPED AREA:2,392 SF (31.9%) POST-PROJECT PERVIOUS CONDITIONS PERVIOUS AREA:2,392 SF (22.1%) IMPERVIOUS AREA:8,408 SF (77.9%) DRAINAGE PLAN NEW DETACHED ADUs ANDY PHAM 1907-1909-1911 S EVERGREEN ST SANTA ANA, CA 92707 EXEMPT FOR DRAINAGE PLAN TYPICAL GRAVEL BAG DETAIL N.T.S. 1 EROSION CONTROL NOTES 1 INSTALL TYPICAL GRAVEL BAGS PER STD. SE-6, CALIFORNIA STORM WATER BMP HANDBOOK 2 INSTALL 10'x10' MATERIAL STOCKPILE AREA PER STANDARD WM-3 DRAWING INDEX SHEET 1 TITLE SHEET - TOPOGRAPHIC EROSION AND HORIZONTAL CONTROL PLAN SHEET 2 DRAINAGE PLAN - DETAILS TO P O G R A P H I C ER O S I O N A N D H O R I Z O N T A L C O N T R O L ASSUME ELEVATION OF TOP OF CURB AT THE NORTHWEST CORNER OF PROPERTY SIDEWALK AND STREET ROAD AS AN INITIAL BENCHMARK WITH ELEVATION OF 10.00' (SEE TOPOGRAPHIC HEREON) (E) 2-STORY RESIDENCE (F.F. = 11.11) (9.58 TC) (9.02 FL) (10.00 TC) (9.40 FL) (ASSUMED ELEVATION) (E) GARAGE ℄ PROPERTY LINE - 135.00' S E V E R G R E E N S T PROPERTY LINE - 135.00' PR O P E R T Y L I N E - 8 0 . 0 0 ' PR O P E R T Y L I N E - 8 0 . 0 0 ' (N) PORCH (N) PATIO COVER (N) PORCH (E) RUMPUS ROOM (F.F. = 10.85) (N) ADU #2 F.F. = 11.55 PAD = 11.13 3 7 2 4 6 9 i=1% FL 8 i= 1 % F L 7 (N) ADU #1 F.F. = 11.55 PAD = 11.13 2 2 2 2 2 10 (E) (E) 1 1 8 8 8 6 (10.60 FG) 10.70 FG (10.44 FG) 10.80 FG (10.67 FG) 10.97 FG (11.10 FG) 11.15 FG (10.56 FG) 11.06 FG 10.61 FS (10.65 FG) 10.77 FS (10.77 FS) 10.50 FS (10.52 FG) 10.60 FS (10.96 FG) 10.30 FS (10.25 FS) 10.61 FS (10.66 FS) 10.61 FS 10.50 FS 10.57 FS 11.30 FS 11.10 FS 11.30 FS 10 . 6 5 F S 11.30 FS 10.10 FL 10.24 FL 10.37 FL 10.53 FL 10.40 FL 10.84 FL10.52 FL 11.02 FL 10 . 8 0 F L 10.69 FL 10 . 4 7 F L 10 . 4 5 F L i= 1 % F L i= 0 . 5 % F L i= 0 . 5 % F L i=0.5% FL i=1% FL i=0.5% FLi=0.5% FL 2% MIN 2% MIN 2% MIN 5% MIN 2% MIN 5% MIN 2% MIN 2% MIN 2% M I N 2% M I N 5% M I N 2% M I N 2% M I N 2% M I N 2% M I N 2% M I N 2% M I N 2% M I N (E)(E) (E) (E) (E) 2% 2% 2% 4 77 7 4 7 4 3 (E) (E) (E) 4 (10.10 FG) 10.47 FS (10.04 FG) 10.30 FS 10.20 FS (10.35 FG) 2% MIN 2% MIN HAG 10.89 FS 10.84 FL HP HAG 11.22 FS 11.17 FL HP 11.22 FS 10.70 FS10.59 FS 11.10 FS 10.50 FS 11.30 FS 11.30 FS 10.80 FS 11.15 FS10.89 FS 11.07 FS 11.08 FS 10.85 FS DRAINAGE PLAN 4" PCC 90% COMPACTED SUBGRADE WALKWAY SECTION N.T.S. 7 4" PCC 6" AB @ 95% COMPACTED SIDEWALK SECTION (WHERE NEEDED) N.T.S. 90% COMPACTED SUBGRADE (E) SIDEWALK TO BE REPLACED IF DAMAGED TO THE SATISFACTION OF THE INSPECTOR. ENCROACHMENT PERMIT IS REQUIRED FOR THE WORK. PRIOR TO PLACEMENT OF FILLS, THE BOTTOM OF THE REMEDIAL REMOVALS NEED TO BE SCARIFIED TO A MINIMUM DEPTH OF 12 INCHES. ONSITE SOIL MAY BE REUSED PROVIDED ALL DELETERIOUS MATERIALS ARE REMOVED. THE EXTENT OF THE REMOVAL SHALL BE WITHIN THE CONCRETE SLAB FOOTPRINT AND 1 FOOT BEYOND. GENERAL GRADING NOTES The following steps will help reduce the stormwater impacts of leaks and spills: Education  Be aware that different materials pollute in different amounts. Make sure that each employee knows what a "significant spill" is for each material they use, and what is the appropriate response for "significant" and "insignificant" spills.  Educate employees and subcontractors on potential dangers to humans and the environment from spills and leaks.  Hold regular meetings to discuss and reinforce appropriate disposal procedures (incorporate into regular safety meetings).  Establish a continuing education program to indoctrinate new employees.  Have contractor's superintendent or representative oversee and enforce proper spill prevention and control measures. General Measures  To the extent that the work can be accomplished safely, spills of oil, petroleum products, substances listed under 40 CFR parts 110,117, and 302, and sanitary and septic wastes should be contained and cleaned up immediately.  Store hazardous materials and wastes in covered containers and protect from vandalism.  Place a stockpile of spill cleanup materials where it will be readily accessible.  Train employees in spill prevention and cleanup.  Designate responsible individuals to oversee and enforce control measures.  Spills should be covered and protected from stormwater runon during rainfall to the extent that it doesn't compromise clean up activities.  Do not bury or wash spills with water.  Store and dispose of used clean up materials, contaminated materials, and recovered spill material that is no longer suitable for the intended purpose in conformance with the provisions in applicable BMPs.  Do not allow water used for cleaning and decontamination to enter storm drains or watercourses. Collect and dispose of contaminated water in accordance with WM-10, Liquid Waste Management.  Contain water overflow or minor water spillage and do not allow it to discharge into drainage facilities or watercourses.  Place proper storage, cleanup, and spill reporting instructions for hazardous materials stored or used on the project site in an open, conspicuous, and accessible location.  Keep waste storage areas clean, well organized, and equipped with ample cleanup supplies as appropriate for the materials being stored. Perimeter controls, containment structures, covers, and liners should be repaired or replaced as needed to maintain proper function. Cleanup  Clean up leaks and spills immediately.  Use a rag for small spills on paved surfaces, a damp mop for general cleanup, and absorbent material for larger spills. If the spilled material is hazardous, then the used cleanup materials are also hazardous and must be sent to either a certified laundry (rags) or disposed of as hazardous waste.  Never hose down or bury dry material spills. Clean up as much of the material as possible and dispose of properly. See the waste management BMPs in this section for specific information. Minor Spills  Minor spills typically involve small quantities of oil, gasoline, paint, etc. which can be controlled by the first responder at the discovery of the spill.  Use absorbent materials on small spills rather than hosing down or burying the spill.  Absorbent materials should be promptly removed and disposed of properly.  Follow the practice below for a minor spill: Contain the spread of the spill. Recover spilled materials. Clean the contaminated area and properly dispose of contaminated materials. Semi-Significant Spills  Semi-significant spills still can be controlled by the first responder along with the aid of other personnel such as laborers and the foreman, etc. This response may require the cessation of all other activities.  Spills should be cleaned up immediately: Contain spread of the spill. Notify the project foreman immediately. If the spill occurs on paved or impermeable surfaces, clean up using "dry" methods (absorbent materials, cat litter and/or rags). Contain the spill by encircling with absorbent materials and do not let the spill spread widely. If the spill occurs in dirt areas, immediately contain the spill by constructing an earthen dike. Dig up and properly dispose of contaminated soil. If the spill occurs during rain, cover spill with tarps or other material to prevent contaminating runoff. Significant/Hazardous Spills  For significant or hazardous spills that cannot be controlled by personnel in the immediate vicinity, the following steps should be taken: Notify the local emergency response by dialing 911. In addition to 911, the contractor will notify the proper county officials. It is the contractor's responsibility to have all emergency phone numbers at the construction site. Notify the Governor's Office of Emergency Services Warning Center, (916) 845-8911. For spills of federal reportable quantities, in conformance with the requirements in 40 CFR parts 110,119, and 302, the contractor should notify the National Response Center at (800) 424-8802. Notification should first be made by telephone and followed up with a written report. The services of a spills contractor or a Haz-Mat team should be obtained immediately. Construction personnel should not attempt to clean up until the appropriate and qualified staffs have arrived at the job site. Other agencies which may need to be consulted include, but are not limited to, the Fire Department, the Public Works Department, the Coast Guard, the Highway Patrol, the City/County Police Department, Department of Toxic Substances, California Division of Oil and Gas, Cal/OSHA, etc. Reporting  Report significant spills to local agencies, such as the Fire Department; they can assist in cleanup.  Federal regulations require that any significant oil spill into a water body or onto an adjoining shoreline be reported to the National Response Center (NRC) at 800-424-8802 (24 hours). Use the following measures related to specific activities: Vehicle and Equipment Maintenance  If maintenance must occur onsite, use a designated area and a secondary containment, located away from drainage courses, to prevent the runon of stormwater and the runoff of spills.  Regularly inspect onsite vehicles and equipment for leaks and repair immediately  Check incoming vehicles and equipment (including delivery trucks, and employee and subcontractor vehicles) for leaking oil and fluids. Do not allow leaking vehicles or equipment onsite.  Always use secondary containment, such as a drain pan or drop cloth, to catch spills or leaks when removing or changing fluids.  Place drip pans or absorbent materials under paving equipment when not in use.  Use absorbent materials on small spills rather than hosing down or burying the spill. Remove the absorbent materials promptly and dispose of properly.  Promptly transfer used fluids to the proper waste or recycling drums. Don't leave full drip pans or other open containers lying around  Oil filters disposed of in trashcans or dumpsters can leak oil and pollute stormwater. Place the oil filter in a funnel over a waste oil-recycling drum to drain excess oil before disposal. Oil filters can also be recycled. Ask the oil supplier or recycler about recycling oil filters.  Store cracked batteries in a non-leaking secondary container. Do this with all cracked batteries even if you think all the acid has drained out. If you drop a battery, treat it as if it is cracked. Put it into the containment area until you are sure it is not leaking. Vehicle and Equipment Fueling  If fueling must occur onsite, use designate areas, located away from drainage courses, to prevent the runon of stormwater and the runoff of spills.  Discourage "topping off" of fuel tanks.  Always use secondary containment, such as a drain pan, when fueling to catch spills/ leaks. Costs Prevention of leaks and spills is inexpensive. Treatment and/ or disposal of contaminated soil or water can be quite expensive. Inspection and Maintenance  Inspect and verify that activity-based BMPs are in place prior to the commencement of associated activities. While activities associated with the BMP are under way, inspect BMPs in accordance with General Permit requirements for the associated project type and risk level. It is recommended that at a minimum, BMPs be inspected weekly, prior to forecasted rain events, daily during extended rain events, and after the conclusion of rain events.  Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges occur.  Keep ample supplies of spill control and cleanup materials onsite, near storage, unloading, and maintenance areas.  Update your spill prevention and control plan and stock cleanup materials as changes occur in the types of chemicals onsite. BENCH MARK BASIS OF BEARING REVISIONS REV. # DATE BY DESCRIPTION SHEET 2 OF 2 EXEMPT FOR DRAINAGE PLAN DRAWING INDEX SHEET 1 TITLE SHEET - TOPOGRAPHIC EROSION AND HORIZONTAL CONTROL PLAN SHEET 2 DRAINAGE PLAN - DETAILS OWNER/DEVELOPER APPROVAL SHEET 1 TITLE SHEET - TOPOGRAPHIC EROSION AND HORIZONTAL CONTROL PLAN SHEET 2 DRAINAGE PLAN - DETAILS BEN PHAN, P.E. CE# 57550 EXP. 12/31/2025 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL.: (714) 251 4537 BENPHANCONSULTANT@GMAIL.COM DRAWN BY:ALBERT LUU CHECKED BY:BEN PHAN PREPARED UNDER THE SUPERVISION OF: BEN PHAN CE NO. 57550, EXP. 12/31/2025 ANDY PHAM TEL.: (714) 548 1937 8732 DUDMAN DR GARDEN GROVE, CA 92841 ANDY PHAM 1907-1909-1911 S EVERGREEN ST SANTA ANA, CA 92707 ASSUME ELEVATION OF TOP OF CURB AT THE NORTHWEST CORNER OF PROPERTY SIDEWALK AND STREET ROAD AS AN INITIAL BENCHMARK WITH ELEVATION OF 10.00' (SEE TOPOGRAPHIC HEREON) Pr o j e c t N a m e Date Drawing Title Project Number DesignedDrawn DRAWING NUMBER Checked ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED DIMENSIONS. CONTRACTOR IS TO NOTIFY THE ENGINEER FOR CLARIFICATION OF OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS. CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS. RULES, REGULATIONS AND ORDINANCES OF THE STATE OF THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS NO. DATE REVISION NE W D E T A C H E D A D U s OW N E R : A N D Y P H A M 19 0 7 - 1 9 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 S-1 Pr o j e c t N a m e Date Drawing Title Project Number DesignedDrawn DRAWING NUMBER Checked ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED DIMENSIONS. CONTRACTOR IS TO NOTIFY THE ENGINEER FOR CLARIFICATION OF OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS. CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS. RULES, REGULATIONS AND ORDINANCES OF THE STATE OF THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS NO. DATE REVISION NE W D E T A C H E D A D U s OW N E R : A N D Y P H A M 19 0 7 - 1 9 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 S-2 DO O R H E I G H T ( H ) SHEARWALL AT DOOR OPENING N.T.S. CEILING BEAM DETAIL N.T.S.08 07 04 03 06 05 02 01 PLASTER CREED N.T.S. EXTERIOR BEARING FOOTING N.T.S. CONCRETE STEPS & LANDING N.T.S. SIMPSON HOLDOWN W/ SSTB BOLT N.T.S. INTERIOR BEARING FOOTING N.T.S. SQUARE FOOTING N.T.S. LANDING DETAIL N.T.S. NON-BEARING INTERIOR WALL N.T.S. 24 23 20 16 12 19 15 14 10 13 09 11 18 17 22 21 RIDGE DETAIL N.T.S. BEAM TO POST CONNECTION N.T.S. INTERIOR NON-BRG WALL @ CLG. N.T.S. FLUSH BEAM DRAG CONNECTION N.T.S. RAKE DETAIL (1-HR FIRE RATED) N.T.S. DTC CLIP 2x BLKG. @ 24" O.C. 1/2" CLR. DOUBLE PLATES STUD WALL JOIST OR 3 - 16d RAFTER JOISTS PARALLEL TO WALL PER JST JOISTS PERPENDICULAR TO WALL STUD WALL DTC CLIP 1/2" CLR.JST. OR RR DOUBLE PLATES HEEL CUT TO MATCH RR WHERE NEEDED POST PER PLAN BM. PER PLAN CEILING JOIST LAP N.T.S. EAVE DETAIL (1-HR FIRE RATED) N.T.S. SHEAR TRANSFER N.T.S. SIMP. STRAP MSTC66 U.O.N. 2X STUDS @ 16" O.C. 2-2X STUDS OR POST PER PLAN DOUBLE TOP PLATES SHEAR WALL WHERE OCCURS CEILING BEAM DETAIL N.T.S. SIMPSON END POST CAP PER PLAN DRAG BEAM PER PLAN CALIFORNIA ROOF DETAIL N.T.S. RAKE DETAIL (1-HR FIRE RATED) N.T.S. SHEAR TRANSFER N.T.S. MONO-POUR ONLY MONO-POUR ONLY 2-2X CEILING JOISTS @ OPENING 2-2X BLKG AROUND EDGES HU2x-2 HANGER ATTIC OPENING DETAIL N.T.S. EAVE DETAIL (1-HR FIRE RATED) N.T.S. Pr o j e c t N a m e Date Drawing Title Project Number DesignedDrawn DRAWING NUMBER Checked ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED DIMENSIONS. CONTRACTOR IS TO NOTIFY THE ENGINEER FOR CLARIFICATION OF OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS. CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS. RULES, REGULATIONS AND ORDINANCES OF THE STATE OF THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS NO. DATE REVISION NE W D E T A C H E D A D U s OW N E R : A N D Y P H A M 19 0 7 - 1 9 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 SD-1 16 12 08 15 11 07 04 03 14 06 13 02 01 22 21 17 09 18 10 PLASTER CREED N.T.S. FOOTING CORNER & INTERSECTION N.T.S. SECTION B MPB66Z REINFORCED FOOTING N.T.S. 24 23 19 WALL FRAMING N.T.S. PIPING THRU PLATE FRAMING N.T.S. STUD NOTCHING/BORING LIMIT N.T.S. PLATE SPLICING N.T.S.20 SD-2 Pr o j e c t N a m e Date Drawing Title Project Number DesignedDrawn DRAWING NUMBER Checked ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED DIMENSIONS. CONTRACTOR IS TO NOTIFY THE ENGINEER FOR CLARIFICATION OF OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS. CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS. RULES, REGULATIONS AND ORDINANCES OF THE STATE OF THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS NO. DATE REVISION NE W D E T A C H E D A D U s OW N E R : A N D Y P H A M 19 0 7 - 1 9 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 DESIGN CRITERIA: Pr o j e c t N a m e Date Drawing Title Project Number DesignedDrawn DRAWING NUMBER Checked ANY DISCREPANCIES. DO NOT SCALE DRAWINGS; USE FIGURED DIMENSIONS. CONTRACTOR IS TO NOTIFY THE ENGINEER FOR CLARIFICATION OF OR EXISTING FIELD CONDITIONS AGAINST DRAWINGS. CONTRACTORS ARE TO VERIFY ALL DIMENSIONS ON DRAWINGS CALIFORNIA RELATING TO STRUCTURES AND BUILDINGS. RULES, REGULATIONS AND ORDINANCES OF THE STATE OF THE BEST OF MY KNOWLEDGE, THE SAME COMPLIES WITH THE HAS BEEN PREPARED UNDER MY SUPERVISION AND THAT TO I HEREBY CERTIFY THAT THE ENGINEERING ON THESE PLANS NO. DATE REVISION NE W D E T A C H E D A D U s OW N E R : A N D Y P H A M 19 0 7 - 1 9 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 SN-1 AD U # 1 T2 4 R E P O R T SHEET T1 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 AD U # 1 T2 4 R E P O R T SHEET T2 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 AD U # 2 T2 4 R E P O R T SHEET T3 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 AD U # 2 T2 4 R E P O R T SHEET T4 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 GR E E N B U I L D I N G ST A N D A R D S C O D E SHEET T5 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 CHAPTER 4 RESIDENTIAL MANDATORY MEASURES DIVISION 4.1 PLANNING AND DESIGN DIVISION 4.3 WATER EFFICIENCY AND CONSERVATION 4.406 ENHANCED DURABILITY AND REDUCED MAINTENANCE 4.406.1 RODENT PROOFING. Annular spaces around pipes, electric cables, conduits or other openings in sole/bottom plates at exterior walls shall be protected against the passage of rodents by closing such openings with cement mortar, concrete masonry or a similar method acceptable to the enforcing agency. 4.408 CONSTRUCTION WASTE REDUCTION, DISPOSAL AND RECYCLING 4.408.1 CONSTRUCTION WASTE MANAGEMENT. Recycle and/or salvage for reuse a minimum of 65 percent of the non-hazardous construction and demolition waste in accordance with either Section 4.408.2, 4.408.3 or 4.408.4, or meet a more stringent local construction and demolition waste management ordinance. Exceptions: 1. Excavated soil and land-clearing debris. 2. Alternate waste reduction methods developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist or are not located reasonably close to the jobsite. 3. The enforcing agency may make exceptions to the requirements of this section when isolated jobsites are located in areas beyond the haul boundaries of the diversion facility. 4.408.2 CONSTRUCTION WASTE MANAGEMENT PLAN. Submit a construction waste management plan in conformance with Items 1 through 5. The construction waste management plan shall be updated as necessary and shall be available during construction for examination by the enforcing agency. 1. Identify the construction and demolition waste materials to be diverted from disposal by recycling, reuse on the project or salvage for future use or sale. 2. Specify if construction and demolition waste materials will be sorted on-site (source separated) or bulk mixed (single stream). 3. Identify diversion facilities where the construction and demolition waste material collected will be taken. 4. Identify construction methods employed to reduce the amount of construction and demolition waste generated. 5. Specify that the amount of construction and demolition waste materials diverted shall be calculated by weight or volume, but not by both. 4.408.3 WASTE MANAGEMENT COMPANY. Utilize a waste management company, approved by the enforcing agency, which can provide verifiable documentation that the percentage of construction and demolition waste material diverted from the landfill complies with Section 4.408.1. Note: The owner or contractor may make the determination if the construction and demolition waste materials will be diverted by a waste management company. 4.408.4 WASTE STREAM REDUCTION ALTERNATIVE [LR]. Projects that generate a total combined weight of construction and demolition waste disposed of in landfills, which do not exceed 3.4 lbs./sq.ft. of the building area shall meet the minimum 65% construction waste reduction requirement in Section 4.408.1 4.408.4.1 WASTE STREAM REDUCTION ALTERNATIVE. Projects that generate a total combined weight of construction and demolition waste disposed of in landfills, which do not exceed 2 pounds per square foot of the building area, shall meet the minimum 65% construction waste reduction requirement in Section 4.408.1 4.408.5 DOCUMENTATION. Documentation shall be provided to the enforcing agency which demonstrates compliance with Section 4.408.2, items 1 through 5, Section 4.408.3 or Section 4.408.4.. Notes: 1. Sample forms found in "A Guide to the California Green Building Standards Code (Residential)" located at www.hcd.ca.gov/CALGreen.html may be used to assist in documenting compliance with this section. 2. Mixed construction and demolition debris (C & D) processors can be located at the California Department of Resources Recycling and Recovery (CalRecycle). 4.410 BUILDING MAINTENANCE AND OPERATION 4.410.1 OPERATION AND MAINTENANCE MANUAL. At the time of final inspection, a manual, compact disc, web-based reference or other media acceptable to the enforcing agency which includes all of the following shall be placed in the building: 1. Directions to the owner or occupant that the manual shall remain with the building throughout the life cycle of the structure. 2. Operation and maintenance instructions for the following: a. Equipment and appliances, including water-saving devices and systems, HVAC systems, photovoltaic systems, electric vehicle chargers, water-heating systems and other major appliances and equipment. b. Roof and yard drainage, including gutters and downspouts. c. Space conditioning systems, including condensers and air filters. d. Landscape irrigation systems. e. Water reuse systems. 3. Information from local utility, water and waste recovery providers on methods to further reduce resource consumption, including recycle programs and locations. 4. Public transportation and/or carpool options available in the area. 5. Educational material on the positive impacts of an interior relative humidity between 30-60 percent and what methods an occupant may use to maintain the relative humidity level in that range. 6. Information about water-conserving landscape and irrigation design and controllers which conserve water. 7. Instructions for maintaining gutters and downspouts and the importance of diverting water at least 5 feet away from the foundation. 8. Information on required routine maintenance measures, including, but not limited to, caulking, painting, grading around the building, etc. 9. Information about state solar energy and incentive programs available. 10. A copy of all special inspections verifications required by the enforcing agency or this code. 11. Information from the Department of Forestry and Fire Protection on maintenance of defensible space around residential structures. 12. Information and/or drawings identifying the location of grab bar reinforcements. 4.410.2 RECYCLING BY OCCUPANTS. Where 5 or more multifamily dwelling units are constructed on a building site, provide readily accessible area(s) that serves all buildings on the site and are identified for the depositing, storage and collection of non-hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waster, and metals, or meet a lawfully enacted local recycling ordinance, if more restrictive. Exception: Rural jurisdictions that meet and apply for the exemption in Public Resources Code Section 42649.82 (a)(2)(A) et seq. are note required to comply with the organic waste portion of this section. DIVISION 4.4 MATERIAL CONSERVATION AND RESOURCE EFFICIENCY DIVISION 4.5 ENVIRONMENTAL QUALITY 4.303 INDOOR WATER USE 4.303.1 WATER CONSERVING PLUMBING FIXTURES AND FITTINGS. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the sections 4.303.1.1, 4.303.1.2, 4.303.1.3, and 4.303.4.4. Note: All noncompliant plumbing fixtures in any residential real property shall be replaced with water-conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of a certificate of final completion, certificate of occupancy, or final permit approval by the local building department. See Civil Code Section 1101.1, et seq., for the definition of a noncompliant plumbing fixture, types of residential buildings affected and other important enactment dates. 4.303.1.1 Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush. Tank-type water closets shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for Tank-type Toilets. Note: The effective flush volume of dual flush toilets is defined as the composite, average flush volume of two reduced flushes and one full flush. 4.303.1.2 Urinals. The effective flush volume of wall mounted urinals shall not exceed 0.125 gallons per flush. The effective flush volume of all other urinals shall not exceed 0.5 gallons per flush. 4.303.1.3 Showerheads. 4.303.1.3.1 Single Showerhead. Showerheads shall have a maximum flow rate of not more than 1.8 gallons per minute at 80 psi. Showerheads shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for Showerheads. 4.303.1.3.2 Multiple showerheads serving one shower. When a shower is served by more than one showerhead, the combined flow rate of all the showerheads and/or other shower outlets controlled by a single valve shall not exceed 1.8 gallons per minute at 80 psi, or the shower shall be designed to only allow one shower outlet to be in operation at a time. Note: A hand-held shower shall be considered a showerhead. 4.303.1.4 Faucets. 4.303.1.4.1 Residential Lavatory Faucets. The maximum flow rate of residential lavatory faucets shall not exceed 1.2 gallons per minute at 60 psi. The minimum flow rate of residential lavatory faucets shall not be less than 0.8 gallons per minute at 20 psi. 4.303.1.4.2 Lavatory Faucets in Common and Public Use Areas. The maximum flow rate of lavatory faucets installed in common and public use areas (outside of dwellings or sleeping units) in residential buildings shall not exceed 0.5 gallons per minute at 60 psi. 4.303.1.4.3 Metering Faucets. Metering faucets when installed in residential buildings shall not deliver more than 0.2 gallons per cycle. 4.303.1.4.4 Kitchen Faucets. The maximum flow rate of kitchen faucets shall not exceed 1.8 gallons per minute at 60 psi. Kitchen faucets may temporarily increase the flow above the maximum rate, but not to exceed 2.2 gallons per minute at 60 psi, and must default to a maximum flow rate of 1.8 gallons per minute at 60 psi. Note: Where complying faucets are unavailable, aerators or other means may be used to achieve reduction. 4.303.1.4.5 Pre-rinse spray valves. When installed, shall meet the requirements in the California Code of Regulations, Title 20 (Appliance Efficiency Regulations), Sections 1605.1 (h)(4) Table H-2, Section 1605.3 (h)(4)(A), and Section 1607 (d)(7) and shall be equipped with an integral automatic shutoff. FOR REFERENCE ONLY: The following table and code section have been reprinted from the California Code of Regulations, Title 20 (Appliance Efficiency Regulations),Section 1605.1 (h)(4) and Section 1605.3 (h)(4)(A). Title 20 Section 1605.3 (h)(4)(A): Commercial prerinse spray values manufactured on or after January 1, 2006, shall have a minimum spray force of not less than 4.0 ounces-force (ozf)[113 grams-force(gf)] 4.303.2 Submeters for multifamily buildings and dwelling units in mixed-used residential/commercial buildings. Submeters shall be installed to measure water usage of individual rental dwelling units in accordance with the California Plumbing Code. 4.303.3 Standards for plumbing fixtures and fittings. Plumbing fixtures and fittings shall be installed in accordance with the California Plumbing Code, and shall meet the applicable standards referenced in Table 1701.1 of the California Plumbing Code. TABLE - MAXIMUM FIXTURE WATER USE FIXTURE TYPE FLOW RATE SHOWER HEADS (RESIDENTIAL)1.8 GMP @ 80 PSI LAVATORY FAUCETS (RESIDENTIAL)MAX. 1.2 GPM @ 60 PSI MIN. 0.8 GPM @ 20 PSI LAVATORY FAUCETS IN COMMON & PUBLIC USE AREAS 0.5 GPM @ 60 PSI KITCHEN FAUCETS 1.8 GPM @ 60 PSI METERING FAUCETS 0.2 GAL/CYCLE WATER CLOSET 1.28 GAL/FLUSH URINALS 0.125 GAL/FLUSH 4.304 OUTDOOR WATER USE 4.304.1 OUTDOOR POTABLE WATER USE IN LANDSCAPE AREAS. Residential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resources' Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent. NOTES: 1. The Model Water Efficient Landscape Ordinance (MWELO) is located in the California Code Regulations, Title 23, Chapter 2.7, Division 2. MWELO and supporting documents, including water budget calculator, are available at: https://www.water.ca.gov/ ABBREVIATION DEFINITIONS: HCD Department of Housing and Community Development BSC California Building Standards Commission DSA-SS Division of the State Architect, Structural Safety OSHPD Office of Statewide Health Planning and Development LR Low Rise HR High Rise AA Additions and Alterations N New NOTE: THIS TABLE COMPILES THE DATA IN SECTION 4.303.1, AND IS INCLUDED AS A CONVENIENCE FOR THE USER. SECTION 4.102 DEFINITIONS 4.102.1 DEFINITIONS The following terms are defined in Chapter 2 (and are included here for reference) FRENCH DRAIN. A trench, hole or other depressed area loosely filled with rock, gravel, fragments of brick or similar pervious material used to collect or channel drainage or runoff water. WATTLES. Wattles are used to reduce sediment in runoff. Wattles are often constructed of natural plant materials such as hay, straw or similar material shaped in the form of tubes and placed on a downflow slope. Wattles are also used for perimeter and inlet controls. 4.106 SITE DEVELOPMENT 4.106.1 GENERAL. Preservation and use of available natural resources shall be accomplished through evaluation and careful planning to minimize negative effects on the site and adjacent areas. Preservation of slopes, management of storm water drainage and erosion controls shall comply with this section. 4.106.2 STORM WATER DRAINAGE AND RETENTION DURING CONSTRUCTION. Projects which disturb less than one acre of soil and are not part of a larger common plan of development which in total disturbs one acre or more, shall manage storm water drainage during construction. In order to manage storm water drainage during construction, one or more of the following measures shall be implemented to prevent flooding of adjacent property, prevent erosion and retain soil runoff on the site. 1. Retention basins of sufficient size shall be utilized to retain storm water on the site. 2. Where storm water is conveyed to a public drainage system, collection point, gutter or similar disposal method, water shall be filtered by use of a barrier system, wattle or other method approved by the enforcing agency. 3. Compliance with a lawfully enacted storm water management ordinance. Note: Refer to the State Water Resources Control Board for projects which disturb one acre or more of soil, or are part of a larger common plan of development which in total disturbs one acre or more of soil. (Website: https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.html) 4.106.3 GRADING AND PAVING. Construction plans shall indicate how the site grading or drainage system will manage all surface water flows to keep water from entering buildings. Examples of methods to manage surface water include, but are not limited to, the following: 1. Swales 2. Water collection and disposal systems 3. French drains 4. Water retention gardens 5. Other water measures which keep surface water away from buildings and aid in groundwater recharge. Exception: Additions and alterations not altering the drainage path. 4.106.4 Electric vehicle (EV) charging for new construction. New construction shall comply with Sections 4.106.4.1 or 4.106.4.2 to facilitate future installation and use of EV chargers. Electric vehicle supply equipment (EVSE) shall be installed in accordance with the California Electrical Code, Article 625. Exceptions: 1. On a case-by-case basis, where the local enforcing agency has determined EV charging and infrastructure are not feasible based upon one or more of the following conditions: 1.1 Where there is no local utility power supply or the local utility is unable to supply adequate power. 1.2 Where there is evidence suitable to the local enforcing agency substantiating that additional local utility infrastructure design requirements, directly related to the implementation of Section 4.106.4, may adversely impact the construction cost of the project. 2. Accessory Dwelling Units (ADU) and Junior Accessory Dwelling Units (JADU) without additional parking facilities. 4.106.4.1 New one- and two-family dwellings and townhouses with attached private garages. For each dwelling unit, install a listed raceway to accommodate a dedicated 208/240-volt branch circuit. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or other enclosure in close proximity to the proposed location of an EV charger. Raceways are required to be continuous at enclosed, inaccessible or concealed areas and spaces. The service panel and/or subpanel shall provide capacity to install a 40-ampere 208/240-volt minimum dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overcurrent protective device. Exemption: A raceway is not required if a minimum 40-ampere 208/240-volt dedicated EV branch circuit is installed in close proximity to the proposed location of an EV charger at the time of original construction in accordance with the California Electrical Code. 4.106.4.1.1 Identification. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging as "EV CAPABLE". The raceway termination location shall be permanently and visibly marked as "EV CAPABLE". CHAPTER 3 GREEN BUILDING SECTION 301 GENERAL 301.1 SCOPE. Buildings shall be designed to include the green building measures specified as mandatory in the application checklists contained in this code. Voluntary green building measures are also included in the application checklists and may be included in the design and construction of structures covered by this code, but are not required unless adopted by a city, county, or city and county as specified in Section 101.7. 301.1.1 Additions and alterations. [HCD] The mandatory provisions of Chapter 4 shall be applied to additions or alterations of existing residential buildings where the addition or alteration increases the building's conditioned area, volume, or size. The requirements shall apply only to and/or within the specific area of the addition or alteration. The mandatory provision of Section 4.106.4.2 may apply to additions or alterations of existing parking facilities or the addition of new parking facilities serving existing multifamily buildings. See Section 4.106.4.3 for application. Note: Repairs including, but not limited to, resurfacing, restriping and repairing or maintaining existing lighting fixtures are not considered alterations for the purpose of this section. Note: On and after January 1, 2014, residential buildings undergoing permitted alterations, additions, or improvements shall replace noncompliant plumbing fixtures with water-conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of a certificate of final completion, certificate of occupancy or final permit approval by the local building department. See Civil Code Section 1101.1, et seq., for the definition of a noncompliant plumbing fixture, types of residential buildings affected and other important enactment dates. 301.2 LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS. [HCD] The provisions of individual sections of CALGreen may apply to either low-rise residential buildings high-rise residential buildings, or both. Individual sections will be designated by banners to indicate where the section applies specifically to low-rise only (LR) or high-rise only (HR). When the section applies to both low-rise and high-rise buildings, no banner will be used. SECTION 302 MIXED OCCUPANCY BUILDINGS 302.1 MIXED OCCUPANCY BUILDINGS. In mixed occupancy buildings, each portion of a building shall comply with the specific green building measures applicable to each specific occupancy. Exceptions: 1. [HCD] Accessory structures and accessory occupancies serving residential buildings shall comply with Chapter 4 and Appendix A4, as applicable. 2. [HCD] For purposes of CALGreen, live/work units, complying with Section 419 of the California Building Code, shall not be considered mixed occupancies. Live/Work units shall comply with Chapter 4 and Appendix A4, as applicable. 4.106.4.2 New multifamily dwellings, hotels and motels and new residential parking facilities. When parking is provided, parking spaces for new multifamily dwellings, hotels and motels shall meet the requirements of Sections 4.106.4.2.1 and 4.106.4.2.2. Calculations for spaces shall be rounded up to the nearest whole number. A parking space served by electric vehicle supply equipment or designed as a future EV charging space shall count as at least one standard automobile parking space only for the purpose of complying with any applicable minimum parking space requirements established by a local jurisdiction. See Vehicle Code Section 22511.2 for further details. 4.106.4.2.1Multifamily development projects with less than 20 dwelling units; and hotels and motels with less than 20 sleeping units or guest rooms. The number of dwelling units, sleeping units or guest rooms shall be based on all buildings on a project site subject to this section. 1.EV Capable. Ten (10) percent of the total number of parking spaces on a building site, provided for all types of parking facilities, shall be electric vehicle charging spaces (EV spaces) capable of supporting future Level 2 EVSE. Electrical load calculations shall demonstrate that the electrical panel service capacity and electrical system, including any on-site distribution transformer(s), have sufficient capacity to simultaneously charge all EVs at all required EV spaces at a minimum of 40 amperes. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as “EV CAPABLE” in accordance with the California Electrical Code. Exceptions: 1.When EV chargers (Level 2 EVSE) are installed in a number equal to or greater than the required number of EV capable spaces. 2.When EV chargers (Level 2 EVSE) are installed in a number less than the required number of EV capable spaces, the number of EV capable spaces required may be reduced by a number equal to the number of EV chargers installed. Notes: a.Construction documents are intended to demonstrate the project’s capability and capacity for facilitating future EV charging. b.There is no requirement for EV spaces to be constructed or available until receptacles for EV charging or EV chargers are installed for use. 2.EV Ready. Twenty-five (25) percent of the total number of parking spaces shall be equipped with low power Level 2 EV charging receptacles. For multifamily parking facilities, no more than one receptacle is required per dwelling unit when more than one parking space is provided for use by a single dwelling unit. Exception: Areas of parking facilities served by parking lifts. 4.106.4.2.2 Multifamily development projects with 20 or more dwelling units, hotels and motels with 20 or more sleeping units or guest rooms. The number of dwelling units, sleeping units or guest rooms shall be based on all buildings on a project site subject to this section. 1.EV Capable. Ten (10) percent of the total number of parking spaces on a building site, provided for all types of parking facilities, shall be electric vehicle charging spaces (EV spaces) capable of supporting future Level 2 EVSE. Electrical load calculations shall demonstrate that the electrical panel service capacity and electrical system, including any on-site distribution transformer(s), have sufficient capacity to simultaneously charge all EVs at all required EV spaces at a minimum of 40 amperes. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as “EV CAPABLE” in accordance with the California Electrical Code. Exception: When EV chargers (Level 2 EVSE) are installed in a number greater than five (5) percent of parking spaces required by Section 4.106.4.2.2, Item 3, the number of EV capable spaces required may be reduced by a number equal to the number of EV chargers installed over the five (5) percent required. Notes: a.Construction documents shall show locations of future EV spaces. b.There is no requirement for EV spaces to be constructed or available until receptacles for EV charging or EV chargers are installed for use. 2.EV Ready. Twenty-five (25) percent of the total number of parking spaces shall be equipped with low power Level 2 EV charging receptacles. For multifamily parking facilities, no more than one receptacle is required per dwelling unit when more than one parking space is provided for use by a single dwelling unit. Exception: Areas of parking facilities served by parking lifts. 3.EV Chargers. Five (5) percent of the total number of parking spaces shall be equipped with Level 2 EVSE. Where common use parking is provided, at least one EV charger shall be located in the common use parking area and shall be available for use by all residents or guests. When low power Level 2 EV charging receptacles or Level 2 EVSE are installed beyond the minimum required, an automatic load management system (ALMS) may be used to reduce the maximum required electrical capacity to each space served by the ALMS. The electrical system and any on-site distribution transformers shall have sufficient capacity to deliver at least 3.3 kW simultaneously to each EV charging station (EVCS) served by the ALMS. The branch circuit shall have a minimum capacity of 40 amperes, and installed EVSE shall have a capacity of not less than 30 amperes. ALMS shall not be used to reduce the minimum required electrical capacity to the required EV capable spaces. 4.106.4.2.2.1 Electric vehicle charging stations (EVCS). Electric vehicle charging stations required by Section 4.106.4.2.2, Item 3, shall comply with Section 4.106.4.2.2.1. Exception: Electric vehicle charging stations serving public accommodations, public housing, motels and hotels shall not be required to comply with this section. See California Building Code, Chapter 11B, for applicable requirements. 4.106.4.2.2.1.1 Location. EVCS shall comply with at least one of the following options: 1.The charging space shall be located adjacent to an accessible parking space meeting the requirements of the California Building Code, Chapter 11A, to allow use of the EV charger from the accessible parking space. 2.The charging space shall be located on an accessible route, as defined in the California Building Code, Chapter 2, to the building. Exception: Electric vehicle charging stations designed and constructed in compliance with the California Building Code, Chapter 11B, are not required to comply with Section 4.106.4.2.2.1.1 and Section 4.106.4.2.2.1.2, Item 3. 4.106.4.2.2.1.2 Electric vehicle charging stations (EVCS) dimensions. The charging spaces shall be designed to comply with the following: 1.The minimum length of each EV space shall be 18 feet (5486 mm). 2.The minimum width of each EV space shall be 9 feet (2743 mm). 3.One in every 25 charging spaces, but not less than one, shall also have an 8-foot (2438 mm) wide minimum aisle. A 5-foot (1524 mm) wide minimum aisle shall be permitted provided the minimum width of the EV space is 12 feet (3658 mm). a.Surface slope for this EV space and the aisle shall not exceed 1 unit vertical in 48 units horizontal (2.083 percent slope) in any direction. 4.106.4.2.2.1.3 Accessible EV spaces. In addition to the requirements in Sections 4.106.4.2.2.1.1 and 4.106.4.2.2.1.2, all EVSE, when installed, shall comply with the accessibility provisions for EV chargers in the California Building Code, Chapter 11B. EV ready spaces and EVCS in multifamily developments shall comply with California Building Code, Chapter 11A, Section 1109A. 4.106.4.2.3 EV space requirements. 1.Single EV space required. Install a listed raceway capable of accommodating a 208/240-volt dedicated branch circuit. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or enclosure in close proximity to the location or the proposed location of the EV space. Construction documents shall identify the raceway termination point, receptacle or charger location, as applicable. The service panel and/ or subpanel shall have a 40-ampere minimum dedicated branch circuit, including branch circuit overcurrent protective device installed, or space(s) reserved to permit installation of a branch circuit overcurrent protective device. Exception: A raceway is not required if a minimum 40-ampere 208/240-volt dedicated EV branch circuit is installed in close proximity to the location or the proposed location of the EV space, at the time of original construction in accordance with the California Electrical Code. 2.Multiple EV spaces required. Construction documents shall indicate the raceway termination point and the location of installed or future EV spaces, receptacles or EV chargers. Construction documents shall also provide information on amperage of installed or future receptacles or EVSE, raceway method(s), wiring schematics and electrical load calculations. Plan design shall be based upon a 40-ampere minimum branch circuit. Required raceways and related components that are planned to be installed underground, enclosed, inaccessible or in concealed areas and spaces shall be installed at the time of original construction. SECTION 4.501 GENERAL 4.501.1 Scope The provisions of this chapter shall outline means of reducing the quality of air contaminants that are odorous, irritating and/or harmful to the comfort and well being of a building's installers, occupants and neighbors. SECTION 4.502 DEFINITIONS 5.102.1 DEFINITIONS The following terms are defined in Chapter 2 (and are included here for reference) AGRIFIBER PRODUCTS. Agrifiber products include wheatboard, strawboard, panel substrates and door cores, not including furniture, fixtures and equipment (FF&E) not considered base building elements. COMPOSITE WOOD PRODUCTS. Composite wood products include hardwood plywood, particleboard and medium density fiberboard. "Composite wood products" does not include hardboard, structural plywood, structural panels, structural composite lumber, oriented strand board, glued laminated timber, prefabricated wood I-joists or finger-jointed lumber, all as specified in California Code of regulations (CCR), title 17, Section 93120.1. DIRECT-VENT APPLIANCE. A fuel-burning appliance with a sealed combustion system that draws all air for combustion from the outside atmosphere and discharges all flue gases to the outside atmosphere. DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE. Y N/AYN/AYN/AYN/A RESPON. PARTY RESPON. PARTY RESPON. PARTY RESPON. PARTY 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE RESIDENTIAL MANDATORY MEASURES, SHEET 1 (January 2023)Y = YES N/A =NOT APPLICABLE RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER, OWNER, CONTRACTOR, INSPECTOR ETC.) 4.201 GENERAL 4.201.1 SCOPE. For the purposes of mandatory energy efficiency standards in this code, the California Energy Commission will continue to adopt mandatory standards. DIVISION 4.2 ENERGY EFFICIENCY TABLE H-2 STANDARDS FOR COMMERCIAL PRE-RINSE SPRAY VALUES MANUFACTURED ON OR AFTER JANUARY 28, 2019 PRODUCT CLASS [spray force in ounce force (ozf)]MAXIMUM FLOW RATE (gpm) Product Class 1 (≤1.00 Product Class 2 (> 5.0 ozf and ≤1.20 Product Class 3 (> 8.0 ozf)1.28 Exception: A raceway is not required if a minimum 40-ampere 208/240-volt dedicated EV branch circuit is installed in close proximity to the location or the proposed location of the EV space at the time of original construction in accordance with the California Electrical Code. 4.106.4.2.4 Identification. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as “EV CAPABLE” in accordance with the California Electrical Code. 4.106.4.2.5 Electric Vehicle Ready Space Signage. Electric vehicle ready spaces shall be identified by signage or pavement markings, in compliance with Caltrans Traffic Operations Policy Directive 13-01 (Zero Emission Vehicle Signs and Pavement Markings) or its successor(s). 4.106.4.3 Electric vehicle charging for additions and alterations of parking facilities serving existing multifamily buildings. When new parking facilities are added, or electrical systems or lighting of existing parking facilities are added or altered and the work requires a building permit, ten (10) percent of the total number of parking spaces added or altered shall be electric vehicle charging spaces (EV spaces) capable of supporting future Level 2 EVSE. Notes: 1.Construction documents are intended to demonstrate the project’s capability and capacity for facilitating future EV charging. 2.There is no requirement for EV spaces to be constructed or available until EV chargers are installed for use. x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x x x x x x x x DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 GR E E N B U I L D I N G ST A N D A R D S C O D E SHEET T6 REVISION DATE BY 1 2 3 PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 MAXIMUM INCREMENTAL REACTIVITY (MIR). The maximum change in weight of ozone formed by adding a compound to the "Base Reactive Organic Gas (ROG) Mixture" per weight of compound added, expressed to hundredths of a gram (g O³/g ROC). Note: MIR values for individual compounds and hydrocarbon solvents are specified in CCR, Title 17, Sections 94700 and 94701. MOISTURE CONTENT. The weight of the water in wood expressed in percentage of the weight of the oven-dry wood. PRODUCT-WEIGHTED MIR (PWMIR). The sum of all weighted-MIR for all ingredients in a product subject to this article. The PWMIR is the total product reactivity expressed to hundredths of a gram of ozone formed per gram of product (excluding container and packaging). Note: PWMIR is calculated according to equations found in CCR, Title 17, Section 94521 (a). REACTIVE ORGANIC COMPOUND (ROC). Any compound that has the potential, once emitted, to contribute to ozone formation in the troposphere. VOC. A volatile organic compound (VOC) broadly defined as a chemical compound based on carbon chains or rings with vapor pressures greater than 0.1 millimeters of mercury at room temperature. These compounds typically contain hydrogen and may contain oxygen, nitrogen and other elements. See CCR Title 17, Section 94508(a). 4.503 FIREPLACES 4.503.1 GENERAL. Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with U.S. EPA New Source Performance Standards (NSPS) emission limits as applicable, and shall have a permanent label indicating they are certified to meet the emission limits. Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances. 4.504 POLLUTANT CONTROL 4.504.1 COVERING OF DUCT OPENINGS & PROTECTION OF MECHANICAL EQUIPMENT DURING CONSTRUCTION. At the time of rough installation, during storage on the construction site and until final startup of the heating, cooling and ventilating equipment, all duct and other related air distribution component openings shall be covered with tape, plastic, sheet metal or other methods acceptable to the enforcing agency to reduce the amount of water, dust or debris which may enter the system. 4.504.2 FINISH MATERIAL POLLUTANT CONTROL. Finish materials shall comply with this section. 4.504.2.1 Adhesives, Sealants and Caulks. Adhesives, sealant and caulks used on the project shall meet the requirements of the following standards unless more stringent local or regional air pollution or air quality management district rules apply: 1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 VOC limits, as shown in Table 4.504.1 or 4.504.2, as applicable. Such products also shall comply with the Rule 1168 prohibition on the use of certain toxic compounds (chloroform, ethylene dichloride, methylene chloride, perchloroethylene and tricloroethylene), except for aerosol products, as specified in Subsection 2 below. 2. Aerosol adhesives, and smaller unit sizes of adhesives, and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than 1 pound and do not consist of more than 16 fluid ounces) shall comply with statewide VOC standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with section 94507. 4.504.2.2 Paints and Coatings. Architectural paints and coatings shall comply with VOC limits in Table 1 of the ARB Architectural Suggested Control Measure, as shown in Table 4.504.3, unless more stringent local limits apply. The VOC content limit for coatings that do not meet the definitions for the specialty coatings categories listed in Table 4.504.3 shall be determined by classifying the coating as a Flat, Nonflat or Nonflat-High Gloss coating, based on its gloss, as defined in subsections 4.21, 4.36, and 4.37 of the 2007 California Air Resources Board, Suggested Control Measure, and the corresponding Flat, Nonflat or Nonflat-High Gloss VOC limit in Table 4.504.3 shall apply. 4.504.2.3 Aerosol Paints and Coatings. Aerosol paints and coatings shall meet the Product-weighted MIR Limits for ROC in Section 94522(a)(2) and other requirements, including prohibitions on use of certain toxic compounds and ozone depleting substances, in Sections 94522(e)(1) and (f)(1) of California Code of Regulations, Title 17, commencing with Section 94520; and in areas under the jurisdiction of the Bay Area Air Quality Management District additionally comply with the percent VOC by weight of product limits of Regulation 8, Rule 49. 4.504.2.4 Verification. Verification of compliance with this section shall be provided at the request of the enforcing agency. Documentation may include, but is not limited to, the following: 1. Manufacturer's product specification. 2. Field verification of on-site product containers. CHAPTER 7 INSTALLER & SPECIAL INSPECTOR QUALIFICATIONS 702 QUALIFICATIONS 702.1 INSTALLER TRAINING. HVAC system installers shall be trained and certified in the proper installation of HVAC systems including ducts and equipment by a nationally or regionally recognized training or certification program. Uncertified persons may perform HVAC installations when under the direct supervision and responsibility of a person trained and certified to install HVAC systems or contractor licensed to install HVAC systems. Examples of acceptable HVAC training and certification programs include but are not limited to the following: 1. State certified apprenticeship programs. 2. Public utility training programs. 3. Training programs sponsored by trade, labor or statewide energy consulting or verification organizations. 4. Programs sponsored by manufacturing organizations. 5. Other programs acceptable to the enforcing agency. 702.2 SPECIAL INSPECTION [HCD]. When required by the enforcing agency, the owner or the responsible entity acting as the owner's agent shall employ one or more special inspectors to provide inspection or other duties necessary to substantiate compliance with this code. Special inspectors shall demonstrate competence to the satisfaction of the enforcing agency for the particular type of inspection or task to be performed. In addition to other certifications or qualifications acceptable to the enforcing agency, the following certifications or education may be considered by the enforcing agency when evaluating the qualifications of a special inspector: 1. Certification by a national or regional green building program or standard publisher. 2. Certification by a statewide energy consulting or verification organization, such as HERS raters, building performance contractors, and home energy auditors. 3. Successful completion of a third party apprentice training program in the appropriate trade. 4. Other programs acceptable to the enforcing agency. Notes: 1. Special inspectors shall be independent entities with no financial interest in the materials or the project they are inspecting for compliance with this code. 2. HERS raters are special inspectors certified by the California Energy Commission (CEC) to rate homes in California according to the Home Energy Rating System (HERS). [BSC] When required by the enforcing agency, the owner or the responsible entity acting as the owner's agent shall employ one or more special inspectors to provide inspection or other duties necessary to substantiate compliance with this code. Special inspectors shall demonstrate competence to the satisfaction of the enforcing agency for the particular type of inspection or task to be performed. In addition, the special inspector shall have a certification from a recognized state, national or international association, as determined by the local agency. The area of certification shall be closely related to the primary job function, as determined by the local agency. Note: Special inspectors shall be independent entities with no financial interest in the materials or the project they are inspecting for compliance with this code. 703 VERIFICATIONS 703.1 DOCUMENTATION. Documentation used to show compliance with this code shall include but is not limited to, construction documents, plans, specifications, builder or installer certification, inspection reports, or other methods acceptable to the enforcing agency which demonstrate substantial conformance. When specific documentation or special inspection is necessary to verify compliance, that method of compliance will be specified in the appropriate section or identified applicable checklist. 4.505 INTERIOR MOISTURE CONTROL 4.505.1 General. Buildings shall meet or exceed the provisions of the California Building Standards Code. 4.505.2 CONCRETE SLAB FOUNDATIONS. Concrete slab foundations required to have a vapor retarder by California Building Code, Chapter 19, or concrete slab-on-ground floors required to have a vapor retarder by the California Residential Code, Chapter 5, shall also comply with this section. 4.505.2.1 Capillary break. A capillary break shall be installed in compliance with at least one of the following: 1. A 4-inch (101.6 mm) thick base of 1/2 inch (12.7mm) or larger clean aggregate shall be provided with a vapor barrier in direct contact with concrete and a concrete mix design, which will address bleeding, shrinkage, and curling, shall be used. For additional information, see American Concrete Institute, ACI 302.2R-06. 2. Other equivalent methods approved by the enforcing agency. 3. A slab design specified by a licensed design professional. 4.505.3 MOISTURE CONTENT OF BUILDING MATERIALS. Building materials with visible signs of water damage shall not be installed. Wall and floor framing shall not be enclosed when the framing members exceed 19 percent moisture content. Moisture content shall be verified in compliance with the following: 1. Moisture content shall be determined with either a probe-type or contact-type moisture meter.Equivalent moisture verification methods may be approved by the enforcing agency and shall satisfy requirements found in Section 101.8 of this code. 2. Moisture readings shall be taken at a point 2 feet (610 mm) to 4 feet (1219 mm) from the grade stamped end of each piece verified. 3. At least three random moisture readings shall be performed on wall and floor framing with documentation acceptable to the enforcing agency provided at the time of approval to enclose the wall and floor framing. Insulation products which are visibly wet or have a high moisture content shall be replaced or allowed to dry prior to enclosure in wall or floor cavities. Wet-applied insulation products shall follow the manufacturers' drying recommendations prior to enclosure. 4.506 INDOOR AIR QUALITY AND EXHAUST 4.506.1 Bathroom exhaust fans. Each bathroom shall be mechanically ventilated and shall comply with the following: 1. Fans shall be ENERGY STAR compliant and be ducted to terminate outside the building. 2. Unless functioning as a component of a whole house ventilation system, fans must be controlled by a humidity control. a. Humidity controls shall be capable of adjustment between a relative humidity range less than or equal to 50% to a maximum of 80%. A humidity control may utilize manual or automatic means of adjustment. b. A humidity control may be a separate component to the exhaust fan and is not required to be integral (i.e., built-in) Notes: 1. For the purposes of this section, a bathroom is a room which contains a bathtub, shower or tub/shower combination. 2. Lighting integral to bathroom exhaust fans shall comply with the California Energy Code. 4.507 ENVIRONMENTAL COMFORT 4.507.2 HEATING AND AIR-CONDITIONING SYSTEM DESIGN. Heating and air conditioning systems shall be sized, designed and have their equipment selected using the following methods: 1. The heat loss and heat gain is established according to ANSI/ACCA 2 Manual J - 2011 (Residential Load Calculation), ASHRAE handbooks or other equivalent design software or methods. 2. Duct systems are sized according to ANSI/ACCA 1 Manual D - 2014 (Residential Duct Systems), ASHRAE handbooks or other equivalent design software or methods. 3. Select heating and cooling equipment according to ANSI/ACCA 3 Manual S - 2014 (Residential Equipment Selection), or other equivalent design software or methods. Exception: Use of alternate design temperatures necessary to ensure the system functions are acceptable. TABLE 4.504.1 - ADHESIVE VOC LIMIT1,2 (Less Water and Less Exempt Compounds in Grams per Liter) ARCHITECTURAL APPLICATIONS VOC LIMIT INDOOR CARPET ADHESIVES 50 CARPET PAD ADHESIVES 50 OUTDOOR CARPET ADHESIVES 150 WOOD FLOORING ADHESIVES 100 RUBBER FLOOR ADHESIVES 60 SUBFLOOR ADHESIVES 50 CERAMIC TILE ADHESIVES 65 VCT & ASPHALT TILE ADHESIVES 50 DRYWALL & PANEL ADHESIVES 50 COVE BASE ADHESIVES 50 MULTIPURPOSE CONSTRUCTION ADHESIVE 70 STRUCTURAL GLAZING ADHESIVES 100 SINGLE-PLY ROOF MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC WELDING 510 CPVC WELDING 490 ABS WELDING 325 PLASTIC CEMENT WELDING 250 ADHESIVE PRIMER FOR PLASTIC 550 CONTACT ADHESIVE 80 SPECIAL PURPOSE CONTACT ADHESIVE 250 STRUCTURAL WOOD MEMBER ADHESIVE 140 TOP & TRIM ADHESIVE 250 SUBSTRATE SPECIFIC APPLICATIONS METAL TO METAL 30 PLASTIC FOAMS 50 POROUS MATERIAL (EXCEPT WOOD)50 WOOD 30 FIBERGLASS 80 1. IF AN ADHESIVE IS USED TO BOND DISSIMILAR SUBSTRATES TOGETHER, THE ADHESIVE WITH THE HIGHEST VOC CONTENT SHALL BE ALLOWED. 2. FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC CONTENT SPECIFIED IN THIS TABLE, SEE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1168. TABLE 4.504.2 - SEALANT VOC LIMIT (Less Water and Less Exempt Compounds in Grams per Liter) SEALANTS VOC LIMIT ARCHITECTURAL 250 MARINE DECK 760 NONMEMBRANE ROOF 300 ROADWAY 250 SINGLE-PLY ROOF MEMBRANE 450 OTHER 420 SEALANT PRIMERS ARCHITECTURAL NON-POROUS 250 POROUS 775 MODIFIED BITUMINOUS 500 MARINE DECK 760 OTHER 750 TABLE 4.504.5 - FORMALDEHYDE LIMITS1 MAXIMUM FORMALDEHYDE EMISSIONS IN PARTS PER MILLION PRODUCT CURRENT LIMIT HARDWOOD PLYWOOD VENEER CORE 0.05 HARDWOOD PLYWOOD COMPOSITE CORE 0.05 PARTICLE BOARD 0.09 MEDIUM DENSITY FIBERBOARD 0.11 THIN MEDIUM DENSITY FIBERBOARD2 0.13 1. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIF. AIR RESOURCES BOARD, AIR TOXICS CONTROL MEASURE FOR COMPOSITE WOOD AS TESTED IN ACCORDANCE WITH ASTM E 1333. FOR ADDITIONAL INFORMATION, SEE CALIF. CODE OF REGULATIONS, TITLE 17, SECTIONS 93120 THROUGH 93120.12. 2. THIN MEDIUM DENSITY FIBERBOARD HAS A MAXIMUM THICKNESS OF 5/16" (8 MM). TABLE 4.504.3 - VOC CONTENT LIMITS FOR ARCHITECTURAL COATINGS2,3 GRAMS OF VOC PER LITER OF COATING, LESS WATER & LESS EXEMPT COMPOUNDS COATING CATEGORY VOC LIMIT FLAT COATINGS 50 NON-FLAT COATINGS 100 NONFLAT-HIGH GLOSS COATINGS 150 SPECIALTY COATINGS ALUMINUM ROOF COATINGS 400 BASEMENT SPECIALTY COATINGS 400 BITUMINOUS ROOF COATINGS 50 BITUMINOUS ROOF PRIMERS 350 BOND BREAKERS 350 CONCRETE CURING COMPOUNDS 350 CONCRETE/MASONRY SEALERS 100 DRIVEWAY SEALERS 50 DRY FOG COATINGS 150 FAUX FINISHING COATINGS 350 FIRE RESISTIVE COATINGS 350 FLOOR COATINGS 100 FORM-RELEASE COMPOUNDS 250 GRAPHIC ARTS COATINGS (SIGN PAINTS)500 HIGH TEMPERATURE COATINGS 420 INDUSTRIAL MAINTENANCE COATINGS 250 LOW SOLIDS COATINGS1 120 MAGNESITE CEMENT COATINGS 450 MASTIC TEXTURE COATINGS 100 METALLIC PIGMENTED COATINGS 500 MULTICOLOR COATINGS 250 PRETREATMENT WASH PRIMERS 420 PRIMERS, SEALERS, & UNDERCOATERS 100 REACTIVE PENETRATING SEALERS 350 RECYCLED COATINGS 250 ROOF COATINGS 50 RUST PREVENTATIVE COATINGS 250 SHELLACS CLEAR 730 OPAQUE 550 SPECIALTY PRIMERS, SEALERS & UNDERCOATERS 100 STAINS 250 STONE CONSOLIDANTS 450 SWIMMING POOL COATINGS 340 TRAFFIC MARKING COATINGS 100 TUB & TILE REFINISH COATINGS 420 WATERPROOFING MEMBRANES 250 WOOD COATINGS 275 WOOD PRESERVATIVES 350 ZINC-RICH PRIMERS 340 1. GRAMS OF VOC PER LITER OF COATING, INCLUDING WATER & EXEMPT COMPOUNDS 2. THE SPECIFIED LIMITS REMAIN IN EFFECT UNLESS REVISED LIMITS ARE LISTED IN SUBSEQUENT COLUMNS IN THE TABLE. 3. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA AIR RESOURCES BOARD, ARCHITECTURAL COATINGS SUGGESTED CONTROL MEASURE, FEB. 1, 2008. MORE INFORMATION IS AVAILABLE FROM THE AIR RESOURCES BOARD. DIVISION 4.5 ENVIRONMENTAL QUALITY (continued) 4.504.3 CARPET SYSTEMS. All carpet installed in the building interior shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.3.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.3.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 4.504.1. 4.504.4 RESILIENT FLOORING SYSTEMS. Where resilient flooring is installed , at least 80% of floor area receiving resilient flooring shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. hhtps://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.5 COMPOSITE WOOD PRODUCTS. Hardwood plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the buildings shall meet the requirements for formaldehyde as specified in ARB's Air Toxics Control Measure for Composite Wood (17 CCR 93120 et seq.), by or before the dates specified in those sections, as shown in Table 4.504.5 4.504.5.1 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: 1. Product certifications and specifications. 2. Chain of custody certifications. 3. Product labeled and invoiced as meeting the Composite Wood Products regulation (see CCR, Title 17, Section 93120, et seq.). 4. Exterior grade products marked as meeting the PS-1 or PS-2 standards of the Engineered Wood Association, the Australian AS/NZS 2269, European 636 3S standards, and Canadian CSA 0121, CSA 0151, CSA 0153 and CSA 0325 standards. 5. Other methods acceptable to the enforcing agency. DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE. Y N/AYN/AYN/AYN/A RESPON. PARTY RESPON. PARTY RESPON. PARTY RESPON. PARTY 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE RESIDENTIAL MANDATORY MEASURES, SHEET 2 (January 2023)Y = YES N/A =NOT APPLICABLE RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER, OWNER, CONTRACTOR, INSPECTOR ETC.) x x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor x Contractor DATE 2/20/2024 NE W D E T A C H E D 7 4 7 S F AN D 7 4 8 S F A D U s OW N E R AN D Y P H A M TE L : ( 7 1 4 ) 5 4 8 1 9 3 7 PR O J E C T A D D R E S S MA I N U N I T : 1 9 1 1 S E V E R G R E E N S T AD U # 1 : 19 0 7 S E V E R G R E E N S T AD U # 2 : 19 0 9 S E V E R G R E E N S T SA N T A A N A , C A 9 2 7 0 7 SANTA ANA CITY COUNCIL Mayor vamezcua@santa-ana.org Mayor Pro Tem, Ward 1 tphan@santa-ana.org Ward 2 bvazquez@santa-ana.org Ward 3 jessielopez@santa-ana.org Ward 4 pbacerra@santa-ana.org Ward 5 jryanhernandez@santa-ana.org MAYOR Valerie Amezcua MAYOR PRO TEM Thai Viet Phan COUNCILMEMBERS Phil Bacerra Johnathan Ryan Hernandez Jessie Lopez David Penaloza Benjamin Vazquez CITY OF SANTA ANA PLANNING AND BUILDING AGENCY 20 Civic Center Plaza ● P.O. Box 1988 Santa Ana, California 92702 www.santa-ana.org CITY MANAGER Alvaro Nuñez CITY ATTORNEY Sonia R. Carvalho CITY CLERK Jennifer L. Hall Also sent via email to: andypham1979@yahoo.com September 6, 2024 Andy Pham 8732 Dudman Drive Garden Grove, CA. 92841 Subject: Address Assignment for Two Accessory Dwelling Units located at 1911 South Evergreen Street and (APN: 014-121-01; 014-121-27) in Santa Ana, CA Dear Andy, The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal addressing within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment for two detached Accessory Dwelling Units located at 1911 South Evergreen Street and (APN: 014-121-01; 014-121-27). Notice is hereby given that the following assigned address(es) shall be posted onsite per the approved address plan, attached hereto as Exhibit A. Address(es) to be Activated/Posted 1. S. Evergreen Street (Address for new detached ADU within ). 2.. Evergreen Street (Address for new detached ADU within ). To subdivide commercial and/or residential units into multiple units, a building permit (and all other associated permits), plans, and inspection approvals by the PBA are required. Address(es) will be verified during inspections by the Building Safety Division. Please update your records accordingly. Should you have any questions, feel free to contact me by phone at (714) 667-2709 or by email at ASevilla@santa-ana.org. Sincerely, Alexis Sevilla Planning Technician Reviewed by Jerry Guevara, AICP, Senior Planner Address Letter for 2021 N. Fairview Street Page 2 of 2 Exhibit A – Address Plan c: Vencent Quaglia, United States Post Office Chris Tuiolosega, United States Post Office Cipriano Corona, Marketing Manager, United States Post Office Alex Alvarez, Postmaster Santa Ana, United States Post Office Federal Express, Administration Cathy Joseph, Garden Grove Unified School District Christine Hy, Garden Grove Unified School District Cathy Slader, Orange Unified School District Orin Williams, Santa Ana Unified School District Yvette Miranda, Santa Ana Unified School District Cristina Bernal, Tustin Unified School District Orange County Fire Authority Neal Kelly, Registrar of Voters Members, Board of Supervisors Southern California Gas Company Southern California Edison Company Claude Parrish, County Assessor's Office SAG, AT&T UPS, Administration City Manager’s Office Beverly Martin, Police Community Services Specialist Boris Duran, Police Systems Manager Jennifer Mendoza, Police Communications Manager Chris Hubbard, Police Systems Support Analyst Alejandra Gutierrez, Treasury & Customer Services Manager Hector Jimenez, Revenue Supervisor Alfonso Chavez, Utilities Customer Services Supervisor Judson Brown, Housing & Neighborhood Development Manager Rudy Rosas, Principal Civil Engineer Zdenek (Zed) Kekula, Principal Civil Engineer Jason Kwak, Building Safety Manager Evelyn LaRocca, Permit Supervisor Kathy Hernandez, Permit Technician Julie Amsden, Permit Technician Ali Pezeshkpour, Planning Manager Jerry Guevara, Senior Planner Yvette Portugal, Code Enforcement Principal Sergio Verino, Code Enforcement Principal (E) GARAGE ℄ PR O P E R T Y L I N E - 1 3 5 . 0 0 ' (E) DECK 403 SF 18 ' - 2 " (E ) G A S ME T E R 12 ' - 0 " (E ) G A S ME T E R (E ) G A S ME T E R S EVERGREEN ST 30 ' - 0 " T O CE N T E R L I N E 4' - 0 " 6' - 0 " 20 ' - 4 " 10 ' - 8 " 6' - 9 " 20 ' - 7 " 38 ' - 3 " 5' - 0 " 8' - 0 " 9' - 8 " 24 ' - 6 " 8' - 0 " 41 ' - 0 " 5' - 0 " 19 ' - 4 " 21 ' - 2 " 20 ' - 1 " 6' - 9 " 29 ' - 8 " 27 ' - 0 " 6' - 3 " 6' - 9 " 37 ' - 3 " 26 ' - 6 " 10 ' - 8 " 31 ' - 0 " 31 ' - 0 " 3' - 0 " PR O P E R T Y L I N E - 1 3 5 . 0 0 ' PROPERTY LINE - 80.00' (E ) 6 ' H B L O C K W A L L (E ) W A T E R ME T E R (E ) P O W E R PO L E UP P E R F L O O R W A L L (E ) P O W E R PO L E 4: 1 2 (E) 4-GANG PANEL, 30A EACH 19 ' - 4 " 29 ' - 8 " PROPERTY LINE - 80.00' 0. 5 : 1 2 0. 5 : 1 2 18" (TYP.) 18" (TYP.) 2% 2% 2% AC 8' - 0 " 19 ' - 0 " 19 ' - 0 " 37 ' - 9 " (N) ADU #2 200A PANEL (N) ADU #1 200A PANEL (N ) P O R C H 37 S F 3' - 3 " 32 ' - 0 " 11 ' - 6 " 13 ' - 0 " (N) ADU #1 200A SUB-PANEL 7' - 1 0 " 11 ' - 1 " (N ) P A T I O CO V E R 18 0 S F 5' - 0 " 11 ' - 6 " 14 ' - 1 " 10 ' - 0 " 14 ' - 8 " 5' - 0 " (N ) P O R C H 14 2 S F AC 20 ' - 0 " (E ) D R I V E W A Y AN D I M P E R V I O U S SU R F A C E FR O N T Y A R D LA N D S C A P I N G (P E R S . A . M . C . S E C . 4 1 - 2 4 0 ) 4:12 (N ) 3 / 4 " WA T E R ME T E R (N ) 3 / 4 " WA T E R ME T E R 12 " ( T Y P . ) 12 " ( T Y P . ) 12 " ( T Y P . ) 12 " ( T Y P . ) 4:12 4:12 4:12 14 SD - 1 1- H R R A T E D OV E R H A N G 14 SD - 1 1- H R R A T E D OV E R H A N G 14 SD - 1 1- H R R A T E D OV E R H A N G AN D W A L L 14 SD - 1 1- H R R A T E D OV E R H A N G AN D W A L L 4: 1 2 4: 1 2 14 SD - 1 1- H R R A T E D OV E R H A N G 14 SD - 1 1- H R R A T E D OV E R H A N G 14 SD - 1 1- H R R A T E D OV E R H A N G (E) RUMPUS ROOM (E ) L A N D S C A P E D AN D G R A S S A R E A (N ) A D U # 2 74 8 S F 19 ' - 0 " (N ) A D U # 1 74 7 S F (N ) P O R C H 37 S F 32 ' - 0 " (N ) P O R C H 18 0 S F (N ) P O R C H 14 2 S F SO L A R Z O N E 25 0 S F ( 3 8 . 5 ' x 6 . 5 ' ) SO L A R Z O N E 1 12 5 S F (1 3 . 5 ' x 9 . 2 5 ' ) 48 ' - 1 0 " 24 ' - 6 " 3' - 0 " 3' - 0 " 3' - 0 " 3' - 0 " SO L A R Z O N E 2 12 5 S F (1 3 . 5 ' x 9 . 2 5 ' ) 3' - 0 " 3' - 0 " ATTIC VENTILATION CALCULATION TOTAL ATTIC VENTILATION AREA SHALL NOT BE LESS THAN 1/150 OF THE ATTIC SPACE AREA.1. ADU #1: ATTIC SPACE = 747 + 37 + 142 = 926 SF ATTIC VENTS REQUIRED = 926/150 = 6.2 SF 2. ADU #2: ATTIC SPACE = 748 + 180 = 928 SF ATTIC VENTS REQUIRED = 928/150 = 6.2 SF ===> PROVIDE 8 VENTS ON THE ADUs, OHAGINTM 14"DIAMETER ROOF VENTS (1.07 SF EACH), AS INDICATED ON ROOF PLAN HEREONPROJECT INFORMATIONOWNER:ANDY PHAMTEL.: (714) 548 1937 ADD.: MAIN: 1911 S EVERGREEN ST ADU #1:TO BE ASSIGNED ADU #2:TO BE ASSIGNED SANTA ANA, CA 92707 (E) UNIT A = 1,272 SF (E) UNIT 1/2 = 894 SF (E) RUMPUS ROOM = 512 SF (E) DECK = 403 SF (E) GARAGE = 603 SF (N) ADU #1 = 747 SF (EXEMPT FOR LOT COVERAGE)(N) ADU #1 PORCHES = 37 SF AND 142 SF (N) ADU #2 = 748 SF (EXEMPT FOR LOT COVERAGE)(N) ADU #2 PATIO COVER = 180 SF LOT COVERAGE = 1,272 + 512 + 603 = 2,387 SF TOTAL LIVING AREA = 1,272 + 512 + 894 + 747 + 748 = 4,173 SF LOT SIZE = 10,800 SF % COVERAGE = 2,387/10,800 = 22.1%APN = TO BE ASSIGNED BY PLANNING ZONE = R1/U FLOOD ZONE = X TYPE OF CONSTRUCTION = VB (E) UNIT'S FIRE SPRINKLER = NOT EQUIPPED APPLICABLE BUILDING STANDARDS 1. 2022 CALIFORNIA MECHANICAL CODE (CMC)2. 2022 CALIFORNIA BUILDING CODE (CBC)3. 2022 CALIFORNIA RESIDENTIAL CODE (CRC)4. 2022 CALIFORNIA PLUMBING CODE (CPC)5. 2022 CALIFORNIA ELECTRICAL CODE (CEC)6. 2022 CALIF. ENERGY EFFICIENCY STANDARD 7. 2022 CALIF. GREEN BUILDING STANDARDS 8. CITY OF SANTA ANA ORDINANCESDRAWING INDEX A1 (N) SITE/ROOF PLAN - GENERAL NOTES A2 (E) SITE/ROOF PLAN - (E) FLOOR PLAN A3 (N) ADU FLOOR PLAN A4 ELEVATION - BUILDING SECTIONS DR1-2 DRAINAGE PLAN SN-1 STRUCTURAL GENERAL NOTES S1-2 FOUNDATION PLAN - FRAMING PLAN SD1-2 STRUCTURAL DETAILS T1-4 TITLE 24 PLAN A5-6 GREEN BUILDING STANDARDS CODESCOPE OF WORK1. BUILD NEW DETACHED 747 SF ADU #1 (2 BEDROOM- 2 BATHROOM) WITH 37 SF AND 142 SF PORCHES 2. BUILD NEW DETACHED 748 SF ADU #2 (2 BEDROOM - 2 BATHROOM) WITH 180 SF PORCH CONSTRUCTION NOTES 1. CONSTRUCTION WORK HOURS ARE 7AM - 7PM,M-F; 9AM - 7PM, SATURDAY; NO SUNDAY OR LEGAL HOLIDAYS.2. THERE SHALL BE NO TRENCHES OR EXCAVATIONS 5' OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND, OR OBTAIN PERMIT FROM STATE OF CA, DIVISION OF OCCUPATIONAL SAFETY AND HEALTH (CAL/OSHA). THIS PERMIT AND ANY OTHER SAFETY PERMIT SHALL BE OBTAINED PRIOR TO COMMENCE OF ANY WORK.VICINITY MAPADU PARKING EXEMPTION NOTE PROPOSED ADU IS LOCATED WITHIN ONE-HALF MILE TO OCTA ROUTE 55 ALONG S STANDARD AVE. AT E OCCIDENTAL ST., PURSUANT TO ASSEMBLY BILL 68,NO PARKING IS REQUIRED FOR THE ADUs.GENERAL NOTES 1. ALL WORK PERFORMED SHALL COMPLY WITH THESE GENERAL NOTES (UNLESS NOTED OTHERWISE ON THESE PLANS AND SPECIFICATIONS) AND ALL THE FOLLOWING NOTES, DRAWINGS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL COORDINATE THE INTENT OF GENERAL NOTES WITH MECHANICAL, ELECTRICAL, AND PLUMBING TRADES.2. THE GENERAL CONTRACTOR OBTAINS AND PAYS FOR ALL REQUIRED PERMITS AND ARRANGES FOR ALL REQUIRED INSPECTIONS.3. ALL WORK SHALL COMPLY WITH LATEST EDITION OF BUILDING CODES AS ADOPTED BY THE CITY OF SANTA ANA AND ALL OTHER APPLICABLE REGULATIONS.4. DO NOT SCALE DRAWINGS. CONTRACTOR SHALL VERIFY ALL SITES CONDITIONS, DIMENSIONS AND ELEVATION BEFORE STARTING THE WORK, AND NOTIFY THE DESIGNER OF ANY DISCREPANCY, IN WRITING, PRIOR TO PROCEEDING.5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE ALL EXISTING UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSES OF REPAIR OR REPLACEMENT IN CONJUNCTION WITH THE PROSECUTION OF SUCH WORK.6. THE CONTRACTOR SHALL DETERMINE THE LOCATION OF THE UTILITY SERVICES IN THE AREA TO BE EXCAVATED PRIOR TO THE EXCAVATION.7. THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO SOLID WASTE, PETROLEUM BYPRODUCTS,SOIL PARTICULATE, CONSTRUCTION WASTE MATERIALS, OR WASTEWATER GENERATED ON CONSTRUCTION SITE OR BY THE CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED OR DISCHARGED INTO THE STREET, GUTTER OR STORM DRAIN SYSTEM.8. ALL NEW ROOF MATERIALS, STUCCO AND WINDOWS SHALL MATCH EXISTING COLOR AND STYLE.EMERGENCY EGRESS NOTES 1. MIN. SET CLEAR OPENING OF 5.7 SQUARE FEET.2. MIN. 5 SQUARE FEET FOR GRADE-FLOOR OPENINGS 3. MIN. SET CLEAR HEIGHT OF 24 INCHES.4. WINDOW TO BOTTOM OF CLEAR OPENING SHALL BE NO MORE THAN 44 INCHES.STUCCO NOTES 1. A CORROSION RESISTANT WEEP SCREED 2" BELOW PLATE, 6" (2" FOR CONCRETE WALKWAY) ABOVE GRADE THAT ALLOWS TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING IS REQUIRED BELOW THE STUCCO AT THE FOUNDATION PLATE LINE.2. 7/8" MIN. THICK THREE-COAT APPLICATION (SCRATCH, BROWN AND FINISH) OVER SELF-FURRING GALVANIZED WIRE LATH OVER GRADE D BUILDING PAPER AND WIRE BACKING.3. EXTERIOR LATH: PROVIDE 2 LAYERS OF GRADE D PAPER OVER SHEATHING OR WOOD STUDS SETBACK AND PROPERTY LINE NOTE THE OWNER/CONTRACTOR SHALL CONSULT WITH A LAND SURVEYOR TO DETERMINE IF A LOT/BOUNDARY SURVEY IS NEEDED TO VERIFY SETBACKS OF EXISTING AND PROPOSED STRUCTURES WITH RESPECT TO PROPERTY LINES. IN THE EVENT THERE IS DISCREPANCY BETWEEN PROPOSAL AND FIELD MEASUREMENTS OF SETBACK, THE DESIGNER SHALL BE NOTIFIED; AND REVISION SHALL BE SUBMITTED FOR CITY APPROVAL.ELECTRICAL METER LOCATION NOTE THE CONTRACTOR SHALL CONTACT SOUTHERN CALIFORNIA EDISON (SCE) @ 800-655-4555 TO OBTAIN A NEW METER SPOT APPROVAL AND INSTALLATION INSTRUCTIONS PRIOR TO INSTALLING THE NEW METER SERVICE PANEL. LOCATION AND AMPERAGE OF NEW METER IN THIS PLAN ARE ONLY PROPOSAL AND SUBJECT TO SCE FINAL APPROVAL.SITE PLAN ROOF PLAN GENERAL NOTESOWNERANDY PHAM TEL: (714) 548 1937 PROJECT ADDRESS MAIN UNIT: 1911 S EVERGREEN ST ADU #1: TO BE ASSIGNED ADU #2: TO BE ASSIGNED SANTA ANA, CA 92707 DATE 2/20/2024NEW DETACHED 747 SF AND 748 SF ADUs SHEET A1REVISIONDATEBY123PROJECT ENGINEER BEN PHAN 10822 WOODWARD LN GARDEN GROVE, CA 92840 TEL: (714) 251 4537 LA N D S C A P I N G L E G E N D GR A S S O R A C C E P T A B L E D R Y CL I M A T E G R O U N D C O V E R PO P - U P S P R I N K L E R NE W 5 G A L . J U N I P E R B U S H ( T Y P . 6 ) NE W 1 G A L . E N C O R E A Z A L E A ( T Y P . 1 6 ) FR U I T T R E E S ( V A R I E T Y - M A X . 2 0 ' A P A R T ) NE W 2 4 " B O X K I N G P A L M O R S I M I L A R , TR E E S H A L L B E D O U B L E - S T A K E D BU I L D I N G N O T E S 1. A L L C O N C E A L E D W O R K I N S T A L L E D WI T H O U T P E R M I T S M U S T B E E X P O S E D F O R IN S P E C T I O N T O T H E S A T I S F A C T I O N O F T H E BU I L D I N G I N S P E C T O R . T H I S I N C L U D E S ME T H O D S O F A T T A C H M E N T A N D A L L FO O T I N G S , S T R U C T U R A L M E M B E R S , ME C H A N I C A L , E L E C T R I C A L , P L U M B I N G A N D IN S U L A T I O N . 2. M E C H A N I C A L , E L E C T R I C A L A N D P L U M B I N G AR E N O T P A R T O F T H I S P L A N R E V I E W A N D AP P R O V A L . M E P A R E S U B J E C T T O B U I L D I N G FI E L D I N S P E C T I O N . FR O N T Y A R D N O T E S 1. F R O N T Y A R D L A N D S C A P I N G S H A L L C O M P L Y W I T H S. A . M . C . S E C . 4 1 - 2 4 0 . 2. L A N D S C A P I N G A R E A S S H A L L B E D E S I G N E D W I T H A N AU T O M A T I C I R R I G A T I O N S Y S T E M W I T H P O P - U P SP R I N K L E R S . D R I P , B U B B L E R O R O T H E R L O W GA L L O N A G E S Y S T E M S M A Y B E U S E D I N B U F F E R AR E A S A N D N A R R O W S T R I P S . 3. F R O N T Y A R D L A N D S C A P I N G , I F N O T P R E S E N T , SH A L L B E R E S T O R E D W I T H L I V E V E G E T A T I O N (G R A S S O R A C C E P T A B L E D R Y C L I M A T E G R O U N D CO V E R ) . 4. F E N C E I N F R O N T Y A R D S H A L L C O M P L Y W I T H S . A . M . C . SE C . 4 1 - 6 1 0 A N D S H A L L N O T E X C E E D 3 ' I N H E I G H T . EXHIBIT A - ADDRESS PLAN SO L A R Z O N E D E D I C A T I O N SC A L E : 3 / 1 6 " = 1 ' - 0 " PH O T O V O L T A I C S Y S T E M N O T E 1. A M I N I M U M 2. 2 K W d c P H O T O V O L T A I C SY S T E M ( P E R T I T L E 2 4 ) S H A L L B E I N S T A L L E D ON T H E A D U P R I O R T O F I N A L I N S P E C T I O N SI G N - O F F . T H E P V S Y S T E M S H A L L B E SU B M I T T E D U N D E R A S E P A R A T E S U B M I T T A L . 2. S O L A R P E R M I T I S S U A N C E I S R E Q U I R E D PR I O R T O P E R F O R M I N G F R A M I N G IN S P E C T I O N . PL A N N I N G D E P A R T M E N T N O T E 1. T H E O W N E R S H A L L B E R E S P O N S I B L E F O R IN D E N T I N G T H E P R E S E N C E O F A N Y EA S E M E N T S L O C A T E D O N T H E P R O P E R T Y TH A T M A Y A F F E C T T H E P R O J E C T . 2. A L L U T I L I T I E S S H A L L B E U N D E R G R O U N D . EXISTING DUPLEX (NO CHANGE) 1ST FLOOR: 1911 S EVERGREEN ST 2ND FLOOR: 1911 1/2 S EVERGREEN ST NEW ADU 1907 S EVERGREEN ST NEW ADU 1909 S EVERGREEN ST STRUCTURAL CALCULATIONS Date: 11/08/2024 Project Location: Owner: Prepared by: Building Code Edition: Concrete: Foundation: Structural Steel: Pipe Columns: Welding: Concrete Masonry: Grout: Reinforcing Steel: Wood Framing: Studs, joists, rafters: Beams and posts: Glulam: Parallam 2.0 PSL: Microllam L VL: Plywood: Tfl: 1907 S. Evergreen St., Santa Ana, CA 90707 Dinh Nguyen (Luan) 1-Storv ADU (Unit 1) Ben Phan, P.E. (714) 251-4537 11541 Elizabeth Street Garden Grove, CA 92840 2022 California Building Code f c =2,5000 psi @ 28 days Ready-mixed concrete per ASTM C94 Concrete aggregates per ASTM C33 Cement ASMT C150 Type V u.n.o. Minimum allowable soil bearing pressure = 1,500 psf. ASTM A-36, ASTM a-92 ASTM A-53 , Grade B Electric arc process by certified welders in approved licensed fabrication shop. ASTM C90, GradeN, f m = 1,500 psi Type M, 1:3:1/4 mix; Cement:Sand :Hydrated Lime or Lime Putty. 1:3:2 mix; Cement:Sand:3/8" pea gravel; f c = 2,000 psi. Deformed bars per ASTM A915; Grade 40 for #4 and smaller; Grade 60 for #5 and larger. WCLffi or WWP A Grading Rules Agency Douglas Fir-Larch #2 Douglas Fir-Larch # 1 24F-V4 or 24F-V 8 DF/DF (cantilevered) ICC ESR-1387 ICC ESR-1387 4 or more plies, Structural 1 or CD, CC Structural Panel per PS-1-95 ICC ESR-1153 (ILevel) All information shown on plans relative to existing conditions are provided as the best present knowledge but without guarantee of accuracy . Where actual conditions conflict with the plans, they shall be reported to the Engineer so that modifications may be made in writing. Modifications of plans and details shall not be made without written approval of the Engineer . By accepting this calculations or report, the Engineer shall not be held liable for discrepancies not brought up to the attention of the Engineer. The design analysis and calculations were done in accordance with generally accepted engineering principles and practice . DESIGN UVE AND DEAD LOADS ROOF DEAD LOAD : ROOF TYPE 1 FLAT LOAD: ROOFTYPE2 Compl Shingles Roofing = 6.0 PSF RR Comp. Shingles Roofing = 3.0 PSF Sheathing/Insulation = 1.5 PSF RR Sheathing/Insulation = 1.5 PSF 2XRR@16"0C = 2.0 PSF RR 2X RR@ 16" OC = 3.0 PSF 2X CJ @16" OC = 2.0 PSF CJ = 0.0 PSF Drywall Ceiling = 2.2 PSF CJ = 0.0 PSF MPE = 1.0 PSF CJ MPE = 1.0 PSF Future Solar Panels = 3.0 PSF CJ = 0.0 PSF MISCELLANEOUS = 1.3 PSF CJ MISCELLANEOUS = 1.5 PSF SUB-TOTAL = 19.0 PSF SUB-TOTAL = 10.0 PSF SLOPE CORRECTION "X :12" I 4.00 I 1.05 PSF SLOPE CORRECTION "X :12" ~ 1.00 PSF MISCELLANEOUS -0.01 PSF MISCELLANEOUS o.ol PSF ROOF DEAD LOAD : = 20.0 PSF ROOF DEAD LOAD : = 10.0 PSF ROOF SNOW LOAD : = §PSF ROOF SNOW LOAD : = E3 PSF ROOF LIVE LOAD : = PSF ROOF LIVE LOAD : = PSF TOTAL ROOF LOAD : = PSF TOTAL ROOF LOAD : = PSF EXTERIOR WALL LOADS: SECOND FLOOR LOADS Stucco = 10.0 PSF Finish flooring = 0.0 PSF 15/32" SHEATHING = 1.4 PSF 314" subflooring = 0.0 PSF 2X4@16" OIC = 2.0 PSF 2x12@ 16" oc = 0.0 PSF R19 INSULATION = 0.4 PSF Int. non-brg wall = 0.0 PSF 112" GYPSUM BD. = 2.2 PSF 112" gypsum board = 0.0 PSF MISCELLANEOUS = 1.0 PSF R19, MIPIE , & others = 0.0 PSF TOTAL EXTERIOR WALL : = 17.0 PSF FLOOR DEAD LOAD : = 0.0 PSF FLOOR LIVE LOAD : = 40.0 PSF TOTAL FLOOR LOAD = 40.0 PSF INTERIOR SHEAR WALL LOADS: FIRST FLOOR LOADS 112" GYPSUM BD. (B.S.) = DPSF I I = D PSF 2x6@ 16" OIC = PSF = PSF 15132" SHEATHING = PSF = PSF MISCELLANEOUS = PSF DECK DEAD LOAD = 0.0 PSF TOTAL INTERIOR WALL : = 7.0 PSF DECK LIVE LOAD I o.ol PSF ... ,, ,, ~ SOILSDATA: 11 SOILS REPORT :I None Provided -Assume Code Minimum GEOTECHNICAL ENGINEER :I Not Applicable-use code minimums jDATE OF REPORT : L NA BASIC BEARING PRESSURE PADS & CONT . FNDT. = Qa = 1,500 PSF ISOLATED FOUNDATIONS = I ol PSF INCREASE FOR WIDTH = 0.0 % INCREASE FOR DEPTH = 0.0 % MAX . SOIL PRESSURE -Qa = 1,500.0 PSF I o.ol ALLOW PASSIVE PRESSURE = I 0 .01 PCF EQUIV. FLUID PRESSURE = PCF ALLOW SOIL FRICTION = 0 .3 L USGS web services were down for some period of time and as a result th is tool wasn't opera ti onal. resulting in timeout error. USGS web serv ices are now operational so this tool should work as expec ted . OS .HPD 1907 S Evergreen St, Santa Ana, CA 92707, USA Latitude, Longitude: 33.7235004, -117.8573113 Date Design Code Reference Document Risk Category Site Class Type Ss s, s...,s s...,, Sos So1 Type soc PGA FpGA PGA..., TL SsRT SsUH SsD S1RT S1UH S1D PGAd Value 1.277 0.457 1.532 null -See Section 11.4.8 1.022 null -See Section 11.4.8 Value null-See Section 11.4 .8 1.2 null -See Section 11 .4.8 0.539 1.2 0.647 8 1.277 1.371 1.617 0.457 0.493 0.6 0.661 11/8/2024, 10:30 :51 AM ASCE7-16 II + J D-Default (See Section 11.4.3) Description Description MCER ground motion . (for 0 .2 second period) MCER ground motion . (for 1.0s period) Site-mod ified spectral acceleration value Site-mod ified spectral acceleration value Numeric se ismic design value at 0.2 second SA Numeric se ismic design value at 1.0 second SA Seismic des ign category Site amplification factor at 0.2 second Site amplification factor at 1.0 second MCEG peak ground acceleration Site amplification factor at PGA Site modified peak ground acceleration Long-period transition period in seconds Probabilistic risk-targeted ground motion . (0.2 second) Aardvark-.G~ay ~~,._~~ & u pphes ~ (I) (I)'''' a> a Q) .:n (I) - Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration Factored determin istic acceleration value. (0.2 second) Probabilistic risk-targeted ground motion. (1.0 second ) Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration . Factored determin istic acceleration value . (1.0 second) Factored determin istic acceleration value. (Peak Ground Acceleration) SEISMIC LOADS: Latitude = Longtitude = Occupancy Category Important Factor (I) = = 33.7235004 North -117.85731 West SEISIIIC DATA: 1-1--1-.1~-o---II(Table 1.5-2) S s = 5 1 = Site Class = Fa = 1.277 g 1-------1 0.457 g 1----:,...-----1 D 1.20 1.80 Shear Panels Timber Frames .--------------,,---,-------.----+-...:S::.:D=-C=----1 6.50 1.50 Sms = R = 1.532 g = 3.00 1.50 Sm 1 = 0.823 g = 4.00 1.50 1.022 g = 1.30 1.00 0.548 g Use Simplified Alternative Structural Design F = I 1.00 I F = 1.____;1.:.::.0.;:..0 ----11 V = (F*S 05)/R (F*S 05)/R v = v = 0.20 Shear Panels V = 0.68 Timber Frames . ,.J_;;~;;:·, ' WJIIDDATA: WIND LOADS: DESIGN WIND VELOCITY (V3,) = 110.0 MPH Roof Height = 5.0 FT Vtm = 110.0 MPH Wall Height (2ndt floor) = 0.0 FT Occupancy Category = II Wall Height (1st floor) = 9.0 FT Important Factor (I) = 1.00 (Table 1.5-2) Total Height = 14.0 FT Exposure Category = c Mean Roof Height = 11.5 FT Adjustment Coefficient (A.) = 1.29 (Figure 28.6-1) Roof Angle = 18.4 0 Kzt = 1.00 Edge (a) Ps = A.Kzt Ps30 Building Width = 32 .00 3.2 FT Building Length = 34.20 FT Eave Height = 9.0 FT Mean Roof Height = 11.5 4.6 FT a= 3.2 FT 2a = 6.4 FT MWFRS Design Wind Pressure Po3o (psf} Horizontal Loads Roof End Zone Int. Zone Load Direction Angle A 8 c D # ofSW Lines Transverse (Case B) 0.0 19.2 0.0 12.7 0.0 3 Longitudinal (Case A' 18 .4 26 .6 -7.0 17.7 -3 .9 3 2a = 6.4 FT Roof Horizontal Load = 1,353 LBS (Transverse) Roof Horizontal Load I -1,249 LBS (Longitudinal) D D LOAD: Roof weights Roof DL (horiz . Proj.) = Ext . Wall DL = Int. Shear Wall DL = Wall Height (1st floor) = Roof Height = Total height, hn = N-S Length= E-W Length= Roof Area= Tributary Ext . Walls to Roof= Tributary Int. Shear Walls to Roof= Roof Weight = Tributary Ext . Walls to Roof= Tributary Int. Shear Walls to Roof = Wroof = Total DL (W) = Total Base Shear M = Design Base Shear : Period : T=Ct(hn)314 = 0 .02 *(hn)314 = Vertical distributions of seismic forces: Level wx (lb Area (tr) Fx N-S (I b) Roof 33 ,055 1,094 6 ,754 1st Floor - :E 33 ,055 6 ,754 FxE-W (lb 6 ,754 6 ,754 Fpx N-S (I b) 6 ,754 6 ,754 Fx E-W wx 6 ,754 6 ,754 Shear E-W 20.0 17.0 7.0 9.0 5.0 14 .0 32.0 1,094.4 132.4 32.0 21 ,918 10,129 1,008 33,055 33 055 6754 0 .145 sec V= V= 0.2S05 W · (I b) 6 ,754 0.2 S05 W (I b) 6 ,754 Use Use N-S 20.0 17.0 7.0 9.0 5.0 14 .0 34.2 1,094.4 132.4 34.2 21 ,918 10 ,129 1,077 33,124 33124 6 754 E-W 0.20 6 ,754 (I b) 6 ,754 (I b) 6,754 Diaphragm E-W 20.0 17.0 7.0 9 .0 5.0 14 .0 32.0 - 1,094.4 68.4 32.0 21,918 5 ,233 1 ,008 28,159 28159 N-S 0.20 w 6 ,754 lbs fx N-S (psf) 6 .17 fx E-W (psf) 6 .17 N-5 20.0 17.0 7.0 9.0 5.0 14 .0 34.2 - 1,094.4 64.0 34.2 21 ,918 4 ,896 1 ,077 27,892 27 892 fpx N-S (psf) 6 .17 fpx E-W (psf) 6.17 psf plf plf ft ft ft sq.ft . ft ft I I I I I I bs. bs . bs. bs . bs bs Longitudinal Direction: Shear Walls (Vertical): H" h R fl IIQI 00 eve: 1 1 to 2 2 2 to 3 3 fx(psf) 6 .17 6 .17 6 .17 6 .17 6.17 Spacing (ft) 32 14.67 Depth (ft) 34.2 24.5 9.67 •: ~~e Net D (b, ft) 7.00 8.0 See Paae 8 Vseismic (lb) 2,857 2 ,419 Vwind (lb) 1,249 1,249 Vgovems (lb) 2 ,857 2,419 Vgovems(Pit) 408 302 Vtactored(plf) 408 302 Vtactored*1 .0 (plf) 408 302 Min . D (ft) 7.00 4.0 M0 (lb-ft) 25,712 10,886 Wroot (plf) 160 160 Wwall (plf) 153 153 0 .6*MR (lb-ft) 4 ,604 1,503 Tie-down (6") YES YES Tie-down (lb) 3,247 2,681 Tie-down HOU5&SSTB24 HOU2&SSTB16 Comp . Post 2-2x4 2-2x4 0 + E/1.4 E = p Eh p= 1.30 Longitudinal Shear Walls Wall (grid line) l:Fabove (lb) l:Fx (I b) Ftotal v=E/1.4b Shear# Wall Length Sheathing 1 Allowable Shear (I b) (plf) (ft) or2 sides (plf) ·""".!~ 1 2,857 2,857 408 1 7 .0 1 280 --2 -2 ,419 2,419 302 1 8 .0 1 280 Diaphragm (horizontal): Roof Level · 1 1 to 2 2 2 to 3 3 fpx(psf) 6 .17 6 .17 6 .17 6 .17 6 .17 L (ft) 32 14.67 Depth (ft) 34.2 24.5 9.67 Area (tr) 1,094 359 f seismic( plf) 99 45 Vwind(plf) 18 25 Governs Seis. Seis. V govemed(plf) 99 45 Roof Panel 1/2" cox 1/2" cox Shear 270 270 Edge Nail 8d@ 6",6",12" 8d@ 6",6",12" Transverse Direction: Shear Walls (Vertical): Roof Level A A to B B B to C c fx(psf) 6 .17 6 .17 6 .1 7 6 .17 6.17 Spacing (ft) 24.5 9.67 Depth (ft) 32 32 14.67 Net D (b , ft) 16.00 16.00 See Page 8 V seismic (lb) 2,419 2 ,857 Vwind (lb) 1,353 1,353 Vgovems (lb) 2 ,419 2 ,857 Vgovems(Pif) 151 179 Vtactored(p lf) 151 179 Vtactored *1. 0 (plf) 151 179 Min . D (ft) 8.00 8.00 M0 (lb-ft) 10,886 12 ,856 Wroof (plf) 123 133 Wwall (plf) 153 153 0 .6*MR (lb-ft) 5 ,293 5 ,485 Tie-down (6") YES YES Tie-down (lb) 699 921 Tie-down HDU2&SSTB16 HDU2&SSTB16 Camp. Post 2-2x4 2-2x4 2-2x4 D + E/1.4 E = p Eh p= 1.30 Transverse Shear Walls Wall (grid line) l:Fabove (lb) l:Fx (lb Ftotal v=E/1 .4b Shear# Wall Length Sheathing 1 Allowable (I b) (plf) (ft) or 2 sides Shear (plf) A -2,419 2,419 151 1 16.0 1 280 B -2 ,857 2,857 179 1 16.0 1 280 Diaphragm (horizontal): Roof Level · A A to B B B to C c fpx(psf) 6.17 6 .17 6.17 6 .17 6 .17 .. L (ft) 24 .5 9.67 Depth (ft) 32 32 14.67 ~ Area (tr) 784 142 ~ f seismic( plf) 76 30 Vwind(plf) 21 46 Governs Seis. wind Vgovemed(plf) 76 46 Roof Panel 1/2" cox 1/2" cox ~. Shear 270 270 Edge Nail 8d@ 6",6",12" 8d@ 6",6",12" Design Base Shear @ Open Patios (Lines C and 3): EWGorvems = LOAD: Roof weights Roof DL (horiz. Proj.) = Wall Height (1st floor) = Roof Height = Total height, hn = N-S Length= E-W Length= Roof Area= Roof Weight = Wroof = Total DL (W) = Total Base Shear (V) = Base Shear per line = Base Shear per foot (v) = # of Posts per line = Base Shear per Post = Moment per Post = Use 6x6 Post Use PC66 Use MPB66Z Base (All. Moment=) Use ST6326 Ties Check Overturning at Footing Pad: Base Shear per Post = Wall Height (1st floor) = Moment per Post = Use 6x6 Post (Width =) Use 36" Square x 24" Deep Pad (Width =) Moment Arm @ Footing Pad = Overturning Compression (M/Moment Arm=) Effective Length for Soil Moment Resistance = Effective Area for Soil Moment Resistance = Allowable Soil Bearing = Soil Capacity at Pad = V= V= E-W N-S 0.681 1,932 Shear E-W 20.0 9.0 3.0 12.0 9.67 141.9 2,837 2,837 2,837 1.932 966 100 2 483 4,348 6,125 3 ,845 0.681 w 1,932 lbs N-S 20.0 9.0 3.0 12.0 14.67 141.9 2,837 2,837 2 837 1 932 966 66 3 322 2,898 6,125 925 5,815 psf ft ft ft I I sq.ft. bs. bs. I I I I bs bs bs plf ea. bs ft-lbs OK OK OK OK 322 lbs 9.0 ft 2,898 ft-lbs 6.0 in 36.0 in 9.0 in 3,865 lbs 15.0 in 3.8 sq.ft. 1,500 lbs 5,625 OK By: Ben Phan 1 Project Title : Engineer: Project ID : Project Oeser: !wood Beam LIC#: KW-06017286 , Build:20 .23.08 .30 DESCRIPTION: RR-1@ 16" OC CODE REFERENCES Calculations per NOS 2018, IBC 2021 , ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : Allowable Stress Design Load Combination : ASCE 7-16 VP HOME Fb + Fb­ Fe-Prll Wood Species Wood Grade Douglas Fir-Larch Fe-Perp Beam Bracing ~.2 ~ Ft Beam is Fully Braced against lateral-torsional buckling 0 (0 .019995 ~ Lr(0.02666) 2x4 Span= 7.0 n 900 .0 psi 900 .0 psi 1,350 .0 psi 625 .0 psi 180.0 psi 575 .0 psi Project File : SA Evergreen.ec6 I (c) ENERCALC INC 1983-2023 E : Modulus of Elasticity Ebend-xx 1,600 .0 ksi Eminbend-xx 580 .0ksi Density 31 .210pcf Repetitive Member Stress Increase Applied Loads Serv ice loads entered . Load Facto rs will be appl ied fo r calcu lations . Beam self weight calculated and added to loading Uniform Load : D = 0 .0150, Lr = 0.020 ksf, Tributary Width= 1.333 ft , (Roof Loads) DESIGN SUMMARY [Ma~:~~~s~~~~;~-~~;~~~-Rat-io___ -0 .591: 1 Maximum Shear Stress Ratio Section used for this span fv : Actual ····-··-------·-·JI••E•l!*3:411!·11"*1•~1::i: ••1 .. 1 = 0.195 : 1 l fb: Actual = i F'b = j Load Combination ! Location of maximum on span Span #where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection = = 2x4 1,147 .03psi 1 ,940 .63psi +D+Lr 3 .500ft Span# 1 0 .169 in Ratio= 0 in Ratio= 0 .303 in Ratio= 0 in Ratio= F'v Load Combination Location of maximum on span Span # where maximum occurs 497>=360 Span : 1 : Lr Only 0<360 nla 2 77 >=180 Span : 1 : +D+Lr 0<180 n/a = = = = '··-··-·-·-···-······················-···········-······················-··-··-··· ·········-····-··---·---······-··········-····-··· ................................... ,,,_ ················································-·································-......................................... ................ ,_, __ , ___________ Maximum Forces & Stresses for Load Combinations Load Combination llllax Sfress Raflos llllomenf Values Segment Length Span# M v CD CM Ct CLx CE Cfu ci cr M fb F'b DOnly 0 .0 Length= 7 .0 ft 0.363 0 .120 0 .90 1.00 1.00 1.00 1.500 1.00 1.00 1.15 0 .13 507.2 1,397 .3 +D+Lr 1.00 1.00 1.00 1.500 1.00 1.00 1.15 0 .0 Length= 7 .0 ft 0.591 0 .195 1.25 1.00 1.00 1.00 1.500 1.00 1.00 1.15 0.29 1 '147.0 1,940 .6 +D+0.750Lr 1.00 1.00 1.00 1.500 1.00 1.00 1.15 0 .0 Length= 7 .0 ft 0 .509 0 .168 1.25 1.00 1.00 1.00 1.500 1.00 1.00 1.15 0 .25 987.1 1,940.6 +0 .60D 1.00 1.00 1.00 1.500 1.00 1.00 1.15 0 .0 Length = 7 .0 ft 0 .123 0 .040 1.60 1.00 1.00 1.00 1.500 1.00 1.00 1.15 0 .08 304 .3 2 ,484.0 2x4 43.96 psi 225 .00 psi +D+Lr 6 .719ft Span# 1 ···················--··-·-····-········· .. -· ................... _ ....... - Snear Values v fv F'v 0 .00 0 .0 0.0 0 .07 19.4 162.0 0 .00 0 .0 0.0 0 .15 44 .0 225.0 0 .00 0.0 0.0 0 .13 37 .8 225 .0 0 .00 0 .0 0.0 0.04 11 .7 288 .0 Project Title : Engineer: Project ID : Project Oeser: !Wood Beam Project File: SA Evergreen .ec6 LIC#: KW-06017286 , Bu ild:20 .23.08 .30 VP HOME (c) ENERCALC INC 1983-2023 DESCRIPTION: RR-2@ 16" OC CODE REFERENCES Calculations per NOS 2018 , IBC 2021 , ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analys is Method : Allowable St ress Design Load Combination : ASCE 7-16 Wood Species Wood Grade Douglas Fir-Larch No .2 Fb + Fb- Fe-Prll Fe -Perp Fv Ft 900 .0ps i 900 .0ps i 1,350.0ps i 625.0ps i 180.0ps i 575 .0ps i E : Modulus of Elasticity Ebend-xx 1,600.0ks i Eminbend-xx 580.0ksi Dens ity 31 .210pcf Beam Bracing Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase I D(0 .01 9995~Lr(0 .02666) ~~~· ~~-9 ~--2x-6 ----9--~~1 I Span = 12.0 ft L ____ _ -·--·-.. ·-·--·----·--·----.. ----------·-·-... -.... _,_,_,_, _______ , _______________________________________ _ Applied Loads Service loads entered . Load Factors will be appl ied for ca lcu lat ion s . Beam self weight calculated and added to loading Uniform Load : D = 0 .0150 , Lr = 0.020 ksf, Tributary Width = 1 .333 ft, (Roof Loads) ~_$j§.!i_S_U_M_MA.-=.:...:R:....:Y_____ _ _________________ .. ____ __l •• li•!Z!#=41f!.~!IJ.Im•~~J1;1 •• 1, !Maximum Bending Stress Ratio = 0.823: 1 Maximum Shear Stress Ratio = 0.218 : 1 1 Section used for this span 2x6 Section used for this span 2x6 I fb : Actual = 1 ,383 .63ps i fv : Actual = 48 .99 psi F'b = 1 ,681 .88ps i F'v = 225.00 psi Load Combination +D+Lr Load Combination +D+Lr I I Location of maximum on span = 6 .000ft Location of maximum on span = 0.000 ft Span #where max imum occurs = Span # 1 Span #where maximum occurs = Span # 1 I I Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.376 in 0 in 0 .683 in 0 in Ratio= Ratio= Rat io= Ratio= 3 8 2 >=360 0<360 2 10>=180 0<180 Span : 1 : Lr Only n/a Span : 1 : +D+Lr n/a -·--·-·-----·---·------------·---·---------.. ·----·-----·---·-- Maximum Forces & Stresses for Load Combinations J Load Combination Segment Length Max Stress Rabos Moment Values Shear Values DOnly Length = 12.0 ft +D+Lr Length = 12 .0 ft +D+0 .750Lr Length = 12 .0 ft +0 .60D Length= 12.0 ft Span # M V CD CM 0 .514 0 .136 0.90 1.00 1.00 1 0 .823 0.218 1.25 1.00 1.00 1 0 .709 0.188 1.25 1.00 1.00 1 0 .173 0 .046 1.60 1.00 Cfu 1.00 1.00 1.300 1.00 1.00 1.00 1.300 1.00 1.00 1.00 1.300 1.00 1.00 1.00 1.300 1.00 1.00 1.00 1.300 1.00 1.00 1.00 1.300 1.00 1.00 1.00 1.300 1.00 1.00 1.15 1.00 1.15 1.00 1.15 1.00 1.15 1.00 1.15 1.00 1.15 1.00 1.15 M fb 0 .39 622 .2 0 .87 1,383 .6 0 .75 1,193.3 0 .24 373.3 F'b 0 .0 1,211 .0 0 .0 1,681 .9 0.0 1,681 .9 0 .0 2 ,152.8 v fv F'v 0 .00 0 .0 0.0 0 .12 22 .0 162.0 0 .00 0 .0 0 .0 0 .27 49 .0 225.0 0 .00 0 .0 0 .0 0 .23 42 .2 225 .0 0 .00 0.0 0.0 0 .07 13.2 288 .0 Project Title: Engineer: Project ID : Project Oeser: I wood Beam LIC# : KW-06017286 , Build :20 .23 .08 .30 DESCRIPTION: CJ-1@ 16" OC CODE REFERENCES Calculations per NOS 2018 , IBC 2021, ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : Allowable Stress Design Load Combination ASCE 7-16 VP HOME Fb + Fb­ Fe-Prll Wood Species Wood Grade Douglas Fir-Larch Fe-Perp Beam Bracing ~2 ~ Ft Beam is Fully Braced against lateral-torsional buckling 0(0 .01333) Lr(0.01333) 900 .0psi 900 .0psi 1,350 .0 psi 625.0 psi 180.0psi 575 .0psi Project File: SA Evergreen.ec6 I (c) ENERCALC INC 1983-2023 E : Modulus of Elasticity Ebend-xx 1 ,600.0ksi Eminbend-xx 580.0ksi Density 31.210pcf Repetitive Member Stress Increase ! * I ~ -~: I S~o • " Oft I L------------·------··-····-·····-·-·-····-··-·····-··----·····-----··--·-·-····--········----····--·--·-·-··-·-··--------------·-------------··-·····-····---···-··-·--··-·-··-·--··------------....................... ..~ Applied Loads Service loads entered . Load Factors will be applied for calculations . Beam self weight calculated and added to loading Uniform Load : D = 0 .01 0, Lr = 0 .010 ksf, Tributary Width = 1 .333 ft , (Ceiling Loads) DESIGN SUMMARY -------·----···---·-· ______ ---·--------·------- ' Maximum Bending Stress Ratio = 0.658 1 Section used for this span 2x6 fb : Actual = 1,1 05.95psi F'b = 1 ,681 .88psi Load Combination Location of maximum on span = Span #where maximum occurs = Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection +D+Lr 7.000ft Span# 1 0 .348 in Ratio= 0 in Ratio= 0.743 in Ratio= 0 in Ratio= Maximum Shear Stress Ratio Section used for this span tv : Actual F'v Load Combination Location of maximum on span Span # where maximum occurs 482 >=360 Span : 1 : Lr Only 0<360 n/a 226 >=180 Span : 1 : +D+Lr 0<180 n/a = = = = = 0.152 : 1 2x6 34 .09 psi 225 .00 psi +D+Lr 13.591 ft Span# 1 ------------··-------·---····--···---·-·---··-···--... --·--------·-·-·--·-·····-·--···-·-·-·--·--------·-----··· Maximum Forces & Stresses for Load Combinations Load Combination Max Sfress Rafros llllomenf 'li'alues Sfiear 'li'alues Segment Length Span# M v CD CM Ct Clx CE Cfu Ci cr M fb F'b v tv F'v DOnly 0 .0 0 .00 0 .0 0.0 Length= 14.0 ft 0 .485 0 .112 0.90 1.00 1.00 1.00 1.300 1.00 1.00 1.15 0 .37 587.7 1,211 .0 0 .10 18.1 162.0 +D+Lr 1.00 1.00 1.00 1.300 1.00 1.00 1.15 0 .0 0.00 0 .0 0.0 Length = 14.0 ft 0 .658 0 .152 1.25 1.00 1.00 1.00 1.300 1.00 1.00 1.15 0 .70 1,105.9 1,681 .9 0.19 34 .1 225 .0 +D+0 .750Lr 1.00 1.00 1.00 1.300 1.00 1.00 1.15 0 .0 0 .00 0 .0 0.0 Length= 14.0 ft 0 .581 0 .134 1.25 1.00 1.00 1.00 1.300 1.00 1.00 1.15 0 .62 976 .4 1,681 .9 0.17 30 .1 225.0 +0.60D 1.00 1.00 1.00 1.300 1.00 1.00 1.15 0 .0 0.00 0 .0 0.0 Length= 14.0 ft 1 0.164 0 .038 1.60 1.00 1.00 1.00 1.300 1.00 1.00 1.15 0 .22 352.6 2 ,152.8 0 .06 10.9 288.0 II !wood Beam LIC#: KW-06017286, Bu ild :20 .23 .08 .30 DESCRIPTION: HDR-1 -Header CODE REFERENCES Calculations per NOS 2018 , IBC 2021 , ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : Allowable Stress Design Load Combination : ASCE 7-16 Project Title: Engineer : Project 10: Project Oeser: Fb + Fb ­ Fe-Prll Wood Species Wood Grade Douglas Fir-Larch Fe-Perp Beam Bracing ~2 ~ Ft Beam is Fully Braced aga inst lateral-torsional buckling 0(0 .08) Lr(0 .08) 4x1 0 Span = 11 .50 ft 900 psi 900 psi 1350 psi 625 psi 180 ps i 575 ps i Project File: SA Evergreen.ec6 I (c) ENERCALC INC 1983-2023 E : Modulus of Elasticity Ebend-xx 1600ksi Eminbend-xx 580ksi Density 31 .21 pcf Applied Loads Service loads entered . Load Factors will be ap plied for cal cu latio ns. Beam self weight calculated and added to loading Uniform Load : D = 0.020 , Lr = 0 .020 ksf, Tributary Width= 4 .0 ft , (Roof Loads) DESIGN SUMMARY !Maximum Bending Stress Ratio = 0 .492 1 Maximum Shear Stress Ratio = i Section used for this span 4x10 Section used for this span I fb : Actua l = 663.81 psi tv : Actual = I F'b = 1 ,350 .00psi F'v = I Load Combination +D+Lr Load Comb ination Location of maximum on span = 5.750ft Location of maximum on span = I Span #where maximum occurs = Span# 1 Span #where maximum occurs = +D+Lr O.OOOft Span# 1 I Maximum Deflection Max Downward Transient Deflection 0 .086 in Ratio= 1609 >=360 Span : 1 : Lr Only Max Upward Transient Deflection 0 in Ratio= 0 <360 n/a I I I Max Downward Total Deflection 0 .179 in Ratio= 77 0>=180 Span : 1 : +D+Lr Max Upward Total Deflection 0 in Ratio= 0 <180 n/a _j Maximum Forces & Stresses for Load Combinations Load Combination lli'lax Sfress Raf1os lli'lomenf Values Shear Values Segment Length Span# M v CD CM Ct Clx CE Cfu ci C r M fb F'b v tv F'v DOnly 0 .0 0.00 0.0 0.0 Length = 11.50 ft 0 .356 0 .124 0.90 1.00 1.00 1.00 1.200 1.00 1.00 1.00 1.44 345 .9 972 .0 0.43 20 .1 162.0 +D+Lr 1.00 1.00 1.00 1.200 1.00 1.00 1.00 0 .0 0 .00 0.0 0.0 Length = 11 .50 ft 0 .492 0 .172 1.25 1.00 1.00 1.00 1.200 1.00 1.00 1.00 2.76 663 .8 1,350 .0 0.83 38 .6 225.0 +D+0 .750Lr 1.00 1.00 1.00 1.200 1.00 1.00 1.00 0.0 0.00 0.0 0.0 Length = 11 .50 ft 0 .433 0 .151 1.25 1.00 1.00 1.00 1.200 1.00 1.00 1.00 2.43 584 .3 1,350 .0 0.73 34 .0 225 .0 +0 .60D 1.00 1.00 1.00 1.200 1.00 1.00 1.00 0 .0 0.00 0.0 0.0 Length = 11 .50 ft 0 .120 0 .042 1.60 1.00 1.00 1.00 1.200 1.00 1.00 1.00 0 .86 207 .5 1,728 .0 0.26 12.1 288.0 JV LIC#: KW-06017286, Build:20.23.08.30 DESCRIPTION: HDR-1-Header Overall Maximum Deflections Load Combination Span +D+Lr Vertical Reactions Load Combination Max Upward from all Load Conditions Max Upward from Load Combinations Max Upward from Load Cases DOnly +D+Lr +D+0 .750Lr +0.600 Lr Only Project Title : Engineer : Project ID : Project Oeser : Project File: SA Evergreen .ec6 VP HOME (c) ENERCALC INC 1983-2023 Max . "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span 0.1790 5.792 0.0000 0.000 Support notation : Far left is #1 Values in KIPS Support 1 Support 2 0.960 0.960 o.96o o.96o _..dL. p _ g 00 11 0.500 0.500 ~ -4f 0.500 0.500 lf (' 0.960 0.960 ~ !.-Lf '( ~ }2-f) 0.845 0.845 )<.-v 0.300 0.300 0.460 0.460 Project Title : Engineer : Project ID : Project Oeser: !wood Beam LIC#: KW-06017286 , Build :20 .23 .08 .30 DESCRIPTION: HDR-2-Header VP HOME CODE REFERENCES Calculations per NOS 2018 , IBC 2021 , ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : Allowable Stress Design Load Combination . ASCE 7-16 Fb + Fb­ Fe-Prll Wood Species Wood Grade Douglas Fir-Larch Fe -Perp Beam Bracing ~2 ~ Ft Beam is Fully Braced against lateral-torsional buckling r··------------------·--.. ·-····-··-·-' Span= 7 .0 ft 900 .0 psi 900.0psi 1,350 .0 psi 625 .0psi 180.0psi 575.0psi Project File: SA Evergreen.ec6 · I (c) ENERCALC INC 1983-2023 E : Modulus of Elasticity Ebend-xx 1 ,600.0ksi Eminbend-xx 580 .0ksi Density 31.210pcf Applied Loads Service loads entered . Load Factors will be applied for calculat ions. Beam self weight calculated and added to loading Uniform Load : D = 0 .020, Lr = 0.020 ksf, Tributary Width= 6 .0 ft , (Roof Loads) DESIGN SUMMARY l i Maximum Bending Stress Ratio Section used for this span fb : Actual i F'b Load Combination Location of maximum on span Span #where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection = = = = = 0.315 1 6x8 354.85psi 1,125.00psi +D+Lr 3.500ft Span# 1 0.021 in Ratio= 0 in Ratio= 0.044 in Ratio= 0 in Ratio= Maximum Shear Stress Ratio Section used for this span fv : Actual F'v Load Combination Location of maximum on span Span # where maximum occurs 3985 >=360 Span : 1 : Lr Only 0<360 n/a 1921 >=180 Span : 1 : +D+Lr 0<180 n/a Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios Segment Length Span# M V CD CM Ct CLx CE Cfu C i C r DOnly Length = 7 .0 ft 1 +D+Lr Length= 7 .0 ft 1 +D+0 .750Lr Length = 7.0 ft +0 .60D Length= 7 .0 ft 1 0 .227 0 .315 0 .277 0 .077 0 .084 0.90 1.00 1.00 0 .11 6 1.25 1.00 1.00 0 .102 1.25 1.00 1.00 0 .028 1.60 1.00 1.00 1.00 1.000 1.00 1.00 1.00 1.00 1.00 1.000 1.00 1.00 1.00 1.00 1.00 1.000 1.00 1.00 1.00 1.00 1.00 1.000 1.00 1.00 1.00 1.00 1.00 1.000 1.00 1.00 1.00 1.00 1.00 1.000 1.00 1.00 1.00 1.00 1.00 1.000 1.00 1.00 1.00 Moment Values M fb 0 .79 183.8 1.52 354 .9 1.34 312.1 0 .47 110.3 Design OK = 0 .116: 1 6x8 = 26.13 psi = 225.00 psi +D+Lr = 6 .387ft = Span# 1 Sfiear Values F'b v fv F'v 0.0 0 .00 0 .0 0.0 810.0 0 .37 13.5 162.0 0.0 0 .00 0 .0 0.0 1,1 25 .0 0 .72 26 .1 225 .0 0 .0 0 .00 0 .0 0.0 1,1 25 .0 0.63 23.0 225 .0 0 .0 0 .00 0.0 0.0 1,440 .0 0 .22 8.1 288.0 Itt Overall Maximum Deflections Load Combination Span +D+Lr Vertical Reactions Load Combination Max Upward from all Load Cond1t1ons Max Upward from Load Combinations Max Upward from Load Cases DOnly +D+Lr +D+0.750Lr +0 .600 Lr Only Project Title : Engineer: Project ID : Project Oeser: Project File: SA Evergreen.ec6 VP HOME (c) ENERCALC INC 1983-2023 Max . "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span 0.0437 3.526 0.0000 0.000 Support notation : Far left is #1 Values in KIPS Support 1 Support 2 0.871 0.871 0.871 0.871 .JJ/ 0.451 0.451 "F" l-'zOP;;. A} 7 + L-.tf ~ 7h /iJrlJ>o tJtY 0.451 0.451 0.871 0.871 0.766 0.766 0.271 0.271 0.420 0.420 UNIFORM AND POINT LOAD ON CONTINUOUS FOOTING Footing Width (FW) = Footing Depth (FD) = Soil Bearing (SB) = Max . Soil Bearing = Plain Concrete Design: F'c= Tension Fb = Procedures : 12 in 12 in 1 ,500 psf 1,500 psf 2 ,500 psi 80 psi Fsoil = ((D-FD)/12*1D)+SB F'soil = Fsoii-(D/12*(150-110)) w = W*F'soi l/12 w (") 12 X 12 X 15 X 18 X 21 X 24 X 12 X 15 X 18 X 21 X 24 X 12 X 15 X 18 X 21 X 24 X 12 X 15 X 18 X 21 X 24 X 12 X 15 X 18 X 21 X 24 X 30 X M = Fb *W*d"2/12"/6 L = (2*M/w)"1/2 Pmax = 2*L*w D (") Fsoil (psf) F'soil (psf) 5 1 ,500 1,483 12 1,500 1 ,460 12 1 500 1,460 12 1,500 1,460 12 1,500 1,460 12 1 ,500 1 ,460 15 1,500 1,450 15 1,500 1,450 15 1,500 1 ,450 15 1 ,500 1,450 15 1,500 1,450 18 1,500 1 ,440 18 1,500 1,440 18 1,500 1,440 18 1,500 1,440 18 1,500 1,440 21 1 ,500 1,430 21 1,500 1,430 21 1,500 1,430 21 1,500 1,430 21 1,500 1,430 24 1 ,500 1,420 24 1,500 1,420 24 1,500 1,420 24 1,500 1,420 24 1,500 1,420 24 1,500 1,420 Soil Density = Concrete Density= Inc. Width (IW) = Inc. Depth (ID) = w (#/ft} M ('#) 1,483 333 1 ,460 1,920 1 ,825 2,400 2,190 2 ,880 2 ,555 3 360 2 ,920 3 ,840 1,450 3 ,000 1,813 3 ,750 2 ,175 4 ,500 2 ,538 5 ,250 2 ,900 6,000 1,440 4 ,320 1,800 5 ,400 2,160 6,480 2 ,520 7 ,560 2,880 8 ,640 1,430 5 ,880 1,788 7 ,350 2 ,145 8 ,820 2 ,503 10,290 2 ,860 11,760 1,420 7 680 1 ,775 9 ,600 2 ,130 11 ,520 2,485 13,440 2 ,840 15 ,360 3 ,550 19 ,200 110 pcf 150 pcf 0 psf 0 psf L (ft) Pmax (#} 0 .67 1,989 1.62 4 ,736 1.62 5,919 1.62 7 ,103 1.62 8,287 1.62 9 ,471 2 .03 5 ,899 2 .03 7 ,374 2 .03 8,849 2 .03 10,324 2 .03 11,7~ 2.45 /7,05~ 2.45 ~18 2.45 10 ,582 2.45 12 ,345 2.45 14,109 2 .87 8 ,202 2.87 10,252 2 .87 12 ,302 2.87 14 ,353 2.87 16 ,403 3.29 9 ,340 3 .29 11 ,676 3 .29 14 ,011 3 .29 16,346 3 .29 18 ,681 3.29 23,351 Note: For point loads on footings with uniform loads , take the difference between "w" above and the uniform load , then multiply by two and by "L" above for P'max . POINT LOAD ON SQUARE PAD FOOTING Footing Depth (FD) = Soil Bearing (SB) = Max. Soil Bearing = 12 in 1500 pst 1500 pst Soil Density = Concrete Density = Inc . Width (IW) = Inc. Depth (ID) = w (") 12 12 15 18 21 24 18 21 24 30 18 21 24 30 33 36 30 36 42 36 42 48 54 60 66 72 78 84 Plain Concrete Design: L (") 12 12 15 18 21 24 18 21 24 30 18 21 24 30 33 36 30 36 42 36 42 48 54 60 66 72 78 84 F'c = Tension Fb = Procedures: 2,500 psi 80 psi Fsoil = ((D-FD)/12*1D)+SB F'soil = Fsoii-(D/12*(150-11 0)) A= W*L Pmax = F'soii*A D (") Fsoil (psf) F'soil (psf) 5 1,383 1,367 12 1,500 1,460 12 1,500 1,460 12 1,500 1,460 12 1,500 1,460 12 1,500 1,460 15 1,550 1,500 15 1,550 1,500 15 1,550 1,500 15 1,550 1,500 18 1,600 1,500 18 1,600 1,500 18 1,600 1,500 18 1,600 1,500 18 1,600 1,500 18 1,600 1,500 21 1,650 1,500 21 1,650 1,500 21 1,650 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 A.1!fl 1.00 1.00 1.56 2.25 3.06 4.00 2 .25 3.06 4.00 6.25 2.25 3.06 4.00 6.25 7.56 9.00 6.25 9.00 12.25 9.00 12.25 16.00 20.25 25.00 30.25 36.00 42.25 49.00 110 pet 150 pet 200 pst 200 psf Pmax {#} Reinforce 1,367 2-#4 e.w. 1,460 2-#4 e.w. 2,281 3-#4 e.w. 3,285 3-#4 e.w. 4,471 3-#4 e.w. 5,840 3-#4 e.w. 3,375 3-#4 e.w. 4,594 3-#4 e.w. 6,000 3-#4 e.w. 9,375 4-#4 e.w. 3,375 3-#4 e .w. 4,594 3-#4 e.w. 6,000 3-#4 e.w. 9,375 4-#4 e.w. 11,344 4-#4 e.w. 13,500 4-#4 e .w. 9,375 4-#5 e.w. 13,500 4-#5 e .w. 18,375 5-#5 e.w. 13,500 4-#5 e.w. 18,375 5-#5 e.w. 24,000 5-#5 e.w. 30,375 5-#5 e.w. 37,500 6-#5 e.w. 45,375 6-#5 e.w. 54,000 7-#5 e.w. 63,375 7-#5 e.w. 73,500 8-#5 e.w. 17 STRUCTURAL CALCULATIONS Date: 11/08/2024 Project Location : Owner: Prepared by: Building Code Edition: Concrete: Foundation: Structural Steel : Pipe Columns : Welding: Concrete Masonry: Grout: Reinforcing Steel : Wood Framing: Studs , joists, rafters: Beams and posts: Glulam: Parallam 2.0 PSL: Microllam L VL : Plywood: Tn: 1909 S. Evergreen St., Santa Ana, CA 90707 Dinh Nguyen (Luan) 1-Story ADU (Unit 2) Ben Phan , P.E . (714) 251-4537 11541 Elizabeth Street Garden Grove , CA 92840 2022 California Building Code f c =2,5000 psi @ 28 days Ready-mixed concrete per ASTM C94 Concrete aggregates per ASTM C33 Cement ASMT Cl50 Type V u.n.o . Minimum allowable soil bearing pressure = 1,500 psf. ASTM A-36 , ASTM a-92 ASTM A-53 , Grade B Electric arc process by certified welders in approved licensed fabrication shop. ASTM C90, GradeN, f m = 1,500 psi Type M , 1:3:1/4 mix ; Cement:Sand :Hydrated Lime or Lime Putty. 1:3:2 mix; Cement:Sand:3 /8" pea gravel ; f c = 2,000 ps i. Deformed bars per ASTM A915 ; Grade 40 for #4 and smaller; Grade 60 for #5 and larger. WCLffi or WWP A Grading Rules Agency Douglas Fir-Larch #2 Douglas Fir-Larch # 1 24F-V4 or 24F-V8 DF/DF (cantilevered) ICC ESR-1387 ICC ESR-1387 4 or more plies, Structural 1 or CD , CC Structural Panel per PS-1-95 ICC ESR-1153 (!Level) All information shown on plans relative to existing conditions are provided as the best present knowledge but without guarantee of accuracy. Where actual conditions conflict with the plans , they shall be reported to the Engineer so that modifications may be made in writing. Modifications of plans and details shall not be made without written approval of the Engineer. By accepting this calculations or report, the Engineer shall not be held liable for discrepancies not brought up to the attention of the Engineer . The design analysis and calculations were done in accordance with generally accepted engineering principles and practice. _,. A-/i '" DESIGN UVE AND DEAD LOADS -~ :'~:fJ , .:,-,• '"' ROOF DEAD LOAD : ROOF TYPE 1 FLAT LOAD : ROOFTYPE2 Compl Shingles Roofing = 6.0 PSF RR Comp. Shingles Roofing = 3.0 PSF Sheathing/Insulation = 1.5 PSF RR Sheathing/Insulation = 1.5 PSF 2XRR@16"0C = 2.0 PSF RR 2XRR@16"0C = 3.0 PSF 2XCJ@ 16"0C = 2.0 PSF CJ = 0.0 PSF Drywall Ceiling = 2.2 PSF CJ = 0.0 PSF MPE = 1.0 PSF CJ MPE = 1.0 PSF Future Solar Panels = 3.0 PSF CJ = 0.0 PSF MISCELLANEOUS = 1.3 PSF CJ MISCELLANEOUS = 1.5 PSF SUB-TOTAL = 19.0 PSF SUB-TOTAL = 10.0 PSF SLOPE CORRECTION "X :1 2" I 4.00 I 1.05 PSF SLOPE CORRECTION "X : 12" ~ 1.00 PSF MISCELLANEOUS = 0.01 PSF MISCELLANEOUS o.ol PSF ROOF DEAD LOAD : = 20.0 PSF ROOF DEAD LOAD : = 10.0 PSF ROOF SNOW LOAD : = §PSF ROOF SNOW LOAD : = ~ PSF ROOF LIVE LOAD : = PSF ROOF LIVE LOAD : = PSF TOTAL ROOF LOAD : = PSF TOTAL ROOF LOAD : = PSF EXTERIOR WALL LOADS: SECOND FLOOR LOADS Stucco = 10.0 PSF Finish flooring = 0.0 PSF 15132~' SHEATHING = 1.4 PSF 314" subflooring = 0.0 PSF 2X4@16'' OIC = 2.0 PSF 2x12@ 16" oc = 0.0 PSF R191NSULATION = 0.4 PSF Int. non-brg wall = 0.0 PSF 1/2" GYPSUM BD. = 2.2 PSF 1/2" gypsum board = 0.0 PSF MISCELLANEOUS = 1.0 PSF R19 M/P/E, & others = 0.0 PSF TOTAL EXTERIOR WALL : = 17.0 PSF FLOOR DEAD LOAD : = 0.0 PSF FLOOR LIVE LOAD : = 40.0 PSF TOTAL FLOOR LOAD = 40.0 PSF INTERIOR SHEAR WALL LOADS: FIRST FLOOR LOADS 112" GYPSUM BD. (B.S .) = DPSF I I = D PSF 2x6@ 16" OIC = PSF = PSF 15132" SHEATHING = PSF = PSF MISCELLANEOUS = PSF DECK DEAD LOAD = 0.0 PSF TOTAL INTERIOR WALL : = 7.0 PSF DECK LIVE LOAD I o.ol PSF ,,, ' ~ ~< SOILS DATA: ,, -"' SOILS REPORT :I None Provided -Assume Code Minimum GEOTECHNICAL ENGINEER :I Not Applicable -use code minimums I DATE OF REPORT : I NA BASIC BEARING PRESSURE PADS & CONT. FNDT . = Qa = 1,500 PSF ISOLATED FOUNDATIONS = I ol PSF INCREASE FOR WIDTH = 0.0 o/o INCREASE FOR DEPTH = 0.0 o/o MAX . SOIL PRESSURE -Qa = 1,500.0 PSF ALLOW PASSIVE PRESSURE = I 0 .01 PCF EQUIV. FLUID PRESSURE = I o.ol PCF ALLOW SOIL FRICTION = 0 .3 USGS web services were down for some period of time and as a resul t this tool wasn 't operational . resulti ng in timeout error. USGS web serv ices are now operational so this tool should work as expec ted . OSHPD 1907 S Evergreen St , Santa Ana , CA 92707 , USA Latitude, Longitude: 33.7235004, -117.8573113 Date Design C ode Refer ence Docu ment Risk Catego ry Site Class Type Value Ss 1.277 s 1 0.457 SMs 1.532 SM1 null -See Section 11.4.8 Sos 1.022 So 1 null -See Section 11.4 .8 Ty pe Value soc null -See Section 11.4.8 Fa 1.2 Fv null -See Section 11.4.8 PGA 0.539 FpGA 1.2 PG~ 0.647 TL 8 SsRT 1.277 SsUH 1.371 SsD 1.617 S1RT 0.457 S1UH 0.493 S1D 0.6 PGAd 0.661 Des cription 11 /8/2024 , 10:30 :51 AM ASCE7-16 II D-Default (See Section 11 .4.3) MCER ground motion . (for 0 .2 second period) Descri pti o n MCER ground motion. (for 1.0s period) S ite-mod ified spectral acceleration value S ite-mod ified spectral acceleration value Numeric se ismic design value at 0.2 second SA Numeric se ismic design value at 1.0 second SA Seismic des ign category Site amplification factor a t 0.2 second Site amplification factor a t 1.0 second MCEG peak ground accelerat ion Site amplification factor at PGA Site modified peak ground acceleration Long-period tra nsition period in seconds Probabilistic risk-targeted ground motion. (0 .2 second) Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration Factor ed determin istic acceleration value. (0.2 second) Probabilistic risk-targeted ground motion . (1.0 second) Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration . Factored determin is tic accelera tion value. (1.0 second) Factored determin is tic acceleration value . (Peak Ground Acceleration) . SEISMIC LOADS: Latitude Longtitude Occupancy Category Important Factor (I) = = = = 33.7235004 North -11 7.85731 West SasMIC DATA: t-1--1-:.'~-:------ii(Table 1.5-2) s. s1 Site Class Fa Fv = = = = = '· 1.277 g 1--------i 0.457 g 1----::------i D 1.20 1.80 R Shear Panels Timber Frames .--------------,,--,.----T-"-----.-----+-....:S::.:D=-C=-----1 6.50 1.50 Sms = = 1.532 = 3.00 1.50 Sm 1 = 0.823 4.00 1.50 = 1.30 1.00 Use Simplified Alternative Structural Design F = I 1.00 I v = v = ~~ ;:;,:p;"O. .,., - WIND LOADS: DESIGN WIND VELOCITY 0/Js) = Vrm = Occupancy Category = Important Factor (I) = Exposure Category = Adjustment Coefficient ()..} = Kzt = Ps = (F*Sos)/R 0.20 110.0 110.0 II 1.00 c 1.29 1.00 AKztPs30 Shear Panels WJNDDATA: MPH MPH (Table 1.5-2) (Figure 28.6-1) MWFRS Design Wind Pressure p.30 (psf) Horizontal Loads 1.022 0.548 F = I 1.00 I V = (F*Sos)/R v = 0.68 Roof Height = 5.0 Wall Height (2ndt floor) = 0.0 Wall Height (1st floor) = 9.0 Total Height = 14.0 Mean Roof Height = 11 .5 Roof Angle = 18.4 Building Width = 19.00 Building Length = 48.83 Eave Height = 9.0 Mean Roof Height = 11.5 a= 2a = Roof End Zone Int. Zone Load Direction Angle A B c D # ofSW Lines Transverse (Case B) 0.0 19 .2 0.0 12.7 0.0 2 Longitudinal (Case A\ 18.4 26 .6 -7 .0 17.7 -3 .9 3 2a -6 .0 FT Roof Horizontal Load -1,239 LBS (Transverse) Roof Horizontal Load I -1.725 LBS (Longitudinal) g g g D g D Timber Frames FT FT FT FT FT 0 Edge (a) 3.0 FT FT FT 4.6 FT 3.0 FT 6.0 FT . LOAD: Roof weights Roof DL (horiz . Proj .) = Ext . Wall DL = Int. Shear Wall DL = Wall Height (1st floor)= Roof Height = Total height, hn = N-S Length= E-W Length= Roof Area= Tributary Ext . Walls to Roof = Tributary Int. Shear Walls to Roof= Roof Weight = Tributary Ext . Walls to Roof= Tributary Int. Shear Walls to Roof= W roof = Total DL (W) = Total Base Shear M = Design Base Shear : Period : T=Ct(hn)314 = 0 .02*(hn)314 = Vertical distributions of seismic forces: Level wx (lb Area (tr) Fx N-S (lb, Roof 29 ,558 928 6 ,039 1st Floor - :E 29 ,558 6 ,039 FxE-W (lb 6 ,039 6 ,039 Fpx N-S (I b) 6 ,039 6 ,039 Fx E-W wx 6 ,039 6 ,039 Shear E-W 20 .0 17.0 7.0 9.0 5.0 14.0 19.0 927 .8 135.7 19.0 18,581 10,378 599 29,558 29 558 6 039 0 .145 sec V= V= 0.2508 W (I b) 6,039 0.2 S08 W (I b) 6 ,039 Use Use N-S 20.0 17.0 7.0 9.0 5.0 14.0 48 .8 927 .8 135 .7 48 .8 18 ,581 10 ,378 1,538 30,497 30 497 6 039 E-W 0.20 6 ,039 (I b) 6 ,039 (I b) 6 ,039 Diaphragm E-W 20.0 17.0 7.0 9.0 5.0 14.0 19.0 - 92 7.8 97.7 19.0 18 ,581 7 ,471 599 26,651 26 651 N-5 0.20 w 6 ,039 lbs fx N-S (psf) 6.51 fx E-W (psf) 6 .51 N-5 20 .0 17.0 7.0 9.0 5 .0 14 .0 48.8 - 927 .8 38 .0 48 .8 18,581 2 ,907 1,538 23,026 23 026 fpx N-S (psf) 6 .51 fpx E-W (psf) 6 .51 psf plf plf ft ft ft sq.ft . ft ft I I I I I I bs . bs . bs . bs . bs bs Longitudinal Direction: Shear Walls (Vertical): H. h R fl IQI 00 eve: 1 1 to 2 2 fx(psf) 6.51 6 .51 6.51 Spacing (ft) 19 Depth (ft) 48.83 48 .83 Net D. (b , ft) 15.00 11.8 Vseismic (lb) 3,020 3,020 Vwind (lb) 1,725 1,725 Vgovems (lb) 3,020 3,020 Vgovems(Pit) 201 257 Vractored(plf) 201 257 Vractore/1 .0 (plf) 201 257 Min . D (ft) 7.00 5.8 M0 (lb-ft) 12 ,682 13,299 Wroot (plf) 95 95 Wwall (plf) 153 153 0 .6*MR (lb-ft) 3,648 2,461 Tie-down (6'') YES YES Tie-down (lb) 1,390 2,064 Tie-down HDU2&SSTB16 HDU2&SSTB16 Camp . Post 2-2x4 2-2x4 D + E/1.4 E = p Eh p= 1.30 Longitudinal Shear Walls Wall (grid line) :EFabove (lb :EFx (lb Ftota, v=E/1.4b Shear# Wall Length Sheathing 1 Allowable Shear (I b) (plf) (ft) or 2 sides (plf) 1 -3,020 3,020 201 1 15.0 1 280 2 -3,020 3,020 257 1 11 .8 1 280 Diaphragm (horizontal): Roof Level · 1 1 to 2 2 fpx(psf) 6.51 6 .51 6 .51 L (ft) 19 Depth (ft) 48.83 48.83 Area (ff) 928 fseismic(plf) 62 Vwind(plf) 18 Governs Seis. Vgovemed(plf) 62 Roof Panel 1/2" cox Shear 270 Edge Nail 8d@ 6",6",12" Transverse Direction: Shear Walls (Vertical): Roof Level A A to B B B to C c fx(psf) 6.51 6 .51 6 .51 6 .51 6 .51 Spacing (ft) 41 7.83 Depth (ft) 19 19 19 Net D (b, ft) 14.00 12.00 See Page 8 V seismic (lb) 2 ,535 3,020 Vwind (lb) 1,239 1,239 Vgovems (lb) 2,535 3 ,020 Vgovems(Pit) 181 252 Vtactored(plf) 181 252 Vtactored*1.0 (plf) 181 252 Min . D(ft} 6.00 6.00 M0 (lb-ft) 9 ,779 13 ,588 Wroot (plf) 205 215 Wwatl (plf) 153 153 0 .6*MR (lb-ft) 3 ,869 3 ,977 Tie-down (6") YES YES Tie-down (lb) 985 1,602 Tie-down HDU2&SSTB16 HDU2&SSTB16 Comp . Post 2-2x4 2-2x4 2-2x4 0 + E/1.4 E = p Eh p= 1.30 Transverse Shear Walls Wall (grid line) I:Fabove (lb) I:Fx (lb Ftotol v=E/1 .4b Shear# Wall Length Sheathing 1 Allowable (I b) (plf) (ft) or 2 sides Shear (plf) A -2 ,535 2,535 181 1 14.0 1 280 B -3 ,020 3,020 252 1 12 .0 1 280 Diaphragm (horizontal): Roof Level· A A to B B B to C c fpx(psf) 6 .51 6 .51 6 .51 6 .51 6 .51 L (ft) 41 7.83 Depth (ft) 19 19 19 Area (tr) 779 149 fseismic(plf) 133 25 Vwind(plf) 33 33 Governs Seis. wind V govemed(plf) 133 33 Roof Panel 1/2" cox 1/2" cox Shear 270 270 Edge Nail 8d@ 6",6",12" 8d@ 6",6",12" 7 Design Base Shear@ Open Patios (Lines C): EWGorvems = LOAD: Roof weights Roof DL (horiz. Proj.) = Wall Height (1st floor) = Roof Height = Total height, hn = N-S Length= E-W Length= Roof Area= Roof Weight = Wroof = Total DL (W) = Total Base Shear (V) = Base Shear per line = Base Shear per foot (v) = # of Posts per line = Base Shear per Post = Moment per Post = Use 6x6 Post Use PC66 Use MPB66Z Base (All. Moment =) Use ST6326 Ties Check Overturning at Footing Pad: Base Shear per Post = Wall Height (1st floor) = Moment per Post = Use 6x6 Post (Width =) Use 36" Square x 24" Deep Pad (Width =) Moment Arm@ Footing Pad= Overturning Compression (M/Moment Arm=) Effective Length for Soil Moment Resistance = Effective Area for Soil Moment Resistance = Allowable Soil Bearing = Soil Capacity at Pad = V= V= . . - E-W N-S 0.681 2,847 Shear E-W 20.0 9.0 3.0 12 .0 11.00 209.0 4,180 4,180 4,180 2847 1,423 129 2 712 6,405 6 ,125 3,845 0.681 w 2,847 lbs N-S 20.0 9.0 3.0 12.0 19.00 209.0 4,180 4,180 4180 2 847 1,423 75 3 474 4,270 6,125 925 5,815 psf ft ft ft I I sq.ft. bs. bs. I I I I bs bs bs plf ea. bs ft-lbs OK OK OK OK 474 lbs 9.0 ft 4,270 ft-lbs 6.0 in 36.0 in 18.0 in 2,847 lbs 15.0 in 3.8 sq.ft. 1,500 lbs 5,625 OK By : Ben Phan Xj j wood Beam LIC#: KW-06017286 , Build :20.23 .08 .30 DESCRIPTION: RR-1@ 16" OC CODE REFERENCES Calculations per NOS 2018 , IBC 2021 , ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : Allowable Stress Design Load Combination : ASCE 7-16 Wood Species Wood Grade Douglas Fir-Larch No .2 Project Title : Engineer : Project 10: Project Oeser : VP HOME Fb + Fb- Fe-Prll Fe-Perp Fv Ft 900.0 psi 900.0 psi 1,350 .0 psi 625 .0 psi 180.0 psi 575 .0psi Beam Bracing Beam is Fully Braced against lateral-torsional buckling 0(0 .019995~ Lr(0 .02666) 2x6 Project File : SA Evergreen .ec6 J (c) ENERCALC INC 1983-2023 E : Modulus of Elasticity Ebend-xx 1 ,600 .0ksi Eminbend-xx 580 .0ks i Density 31 .21 0 pet Repetitive Member Stress Increase I L----------·------------·-·-··---··---·-························-·-·····-·-····--·-··········--·-~"~=·-------·--···---"··-·------·--····----·--1 Applied Loads Serv ice loads entered . Load Factors will be appl ied for calculations . Beam self weight calculated and added to loading Uniform Load: D = 0 .0150, Lr = 0 .020 ksf, Tributary Width= 1.333 ft , (Roof Loads) ~S.!§_ft! SUMMARY _____________ .. _________ ...... ____ _ _____ •• l!mmllm ••. !·Maximum Bending Stress Ratio = 0.489 1 Maximum Shear Stress Ratio •l§41.Uiel; 0 .164 : 1 Section used for this span 2x6 Section used for this span I fb : Actual = 822 .13psi tv: Actual 1 F'b = 1 ,681.88psi F'v Load Combination Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection = = +D+Lr 4.625ft Span# 1 0 .133 in 0 in 0 .241 in 0 in Ratio= Ratio= Ratio= Ratio= '----------·---·------------------...... _,, __ Load Combination Location of maximum on span Span #where maximum occurs 836>=360 0<360 460>=180 0<180 Span : 1 : Lr Only n/a Span : 1 : +D+Lr n/a Maximum Forces & Stresses for Load Combinations Load Combination Max Stress Ratios Segment Length Span# M V CD CM Ct CLx DOnly Length = 9 .250 ft 1 +D+Lr Length = 9 .250 ft 1 +D+0 .750Lr Length = 9 .250 ft +0 .60D Length= 9 .250 ft 1 0 .305 0.102 0.489 0.164 0 .422 0 .141 0 .103 0 .035 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.25 1.00 1.00 1.00 1.00 1.00 1.00 1.25 1.00 1.00 1.00 1.00 1.00 1.00 1.60 1.00 1.00 1.00 Moment Values CE Cfu C i C r M fb 1.300 1.00 1.00 1.15 0 .23 369 .7 1.300 1.00 1.00 1.15 1.300 1.00 1.00 1.15 0 .52 822 .1 1.300 1.00 1.00 1.15 1.300 1.00 1.00 1.15 0.45 709 .0 1.300 1.00 1.00 1.15 1.300 1.00 1.00 1.15 0.14 221 .8 = 2x6 = 36 .87 psi = 225 .00 psi +D+Lr = 8 .811 ft = Span# 1 Sliear Values F'b v tv F'v 0 .0 0.00 0.0 0.0 1 ,211.0 0.09 16.6 162.0 0.0 0.00 0.0 0.0 1,681 .9 0 .20 36.9 225 .0 0 .0 0.00 0.0 0.0 1,681 .9 0.17 31.8 225 .0 0.0 0.00 0.0 0.0 2 ,1 52 .8 0.05 9 .9 288 .0 I wood Beam LIC#: KW-0601 7286 , Bui ld :20 .23.08 .30 DESCRIPTION: CJ-1@ 16" OC CODE REFERENCES Calculations per NOS 2018 , IBC 2021 , ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Analysis Method : Allowable Stress Des ign Load Comb ination : ASCE 7-16 Wood Species Wood Grade Douglas Fir-La rch No .2 Project Title : Eng ineer: Project 10: Project Oeser : VP HOME Fb + Fb - Fe -Prll Fe -Perp Fv Ft 900 .0ps i 900 .0 psi 1,350 .0psi 625 .0ps i 180.0ps i 575 .0ps i Beam Bracing Beam is Fully Braced against lateral-tors ional buckling v v 0(0 .0 1333) Lr(0 .01333) v ~ 2x8 Span = 18 .50 tt Project File : SA Evergreen .ec6 (c) ENERCALC INC 1983-2023 E : Modulus of Elasticity Ebend-xx 1,600 .0ks i Eminbend-xx 580 .0ksi Dens ity 31 .210pcf Repetitive Member Stress Increase 1 Applied Loads Serv ice loads entered . Load Factors will be applied for calcul ations . Beam self .weight calculated and added to loading Uniform Load : D = 0 .010 , Lr = 0.010 ksf, Tributary Width = 1 .333 ft , (Ceiling Loads} DESIGN SUMMARY = fMa~~~ ~~~~~~;~:~:~P~~-R-atio--= ----------o. ~!f1---M-ax-i-~-~~-0~~~:~-~~~~~f~:~i~---------- 1 fb : Actual = 1 ,133.63 ps i fv : Actual I I F'b = 1 ,552.50psi Load Combination +D+Lr I I Location of maximum on span = 9.250ft Span # where maximum occurs = Span # 1 F'v Load Comb ination Location of maximum on span Span #where maximum occurs Max Downward Transient Deflection 0 .464 in Ratio= 478 >=360 Span : 1 : Lr Only = = = = Design OK 0 .155 : 1 2x8 34 .86 psi 225 .00 psi +D+Lr 17.960ft Span# 1 I Maximum Deflection ; Max Upward Transient Deflection 0 in Rat io = 0 <360 nla j U ax Downward Total Deflection 1 .009 in Rat io= 2 19 >=180 Span : 1 : +D+Lr Max Upward Total Deflection 0 in Ratio= 0 <180 n/a --·--·--·--······---····-····-····-----------------------··--···---······-·····---···----·····--·-··-······ ----------------------------------------- Maximum Forces & Stresses for Load Combinations Load Comb ination Max Sfress Raflos Momenf IJalues Sfiear IJalues Segment Length Span# M v CD CM Ct CLx CE Cfu ci cr M fb F'b v fv F'v DOnly 0.0 0.00 0.0 0.0 Length = 18.50 ft 0.548 0.116 0.90 1.00 1.00 1.00 1.200 1.00 1.00 1.15 0.67 612 .9 1,117.8 0.14 18.8 162.0 +D+Lr 1.00 1.00 1.00 1.200 1.00 1.00 1.15 0.0 0.00 0.0 0.0 Length= 18.50 ft 0.730 0.155 1.25 1.00 1.00 1.00 1.200 1.00 1.00 1.15 1.24 1,133.6 1,552 .5 0.25 34 .9 225 .0 +D+0 .750Lr 1.00 1.00 1.00 1.200 1.00 1.00 1.15 0.0 0.00 0.0 0.0 Length = 18 .50 ft 0.646 0.137 1.25 1.00 1.00 1.00 1.200 1.00 1.00 1.15 1.10 1,003 .4 1,552 .5 0.22 30 .9 225 .0 +0 .60D 1.00 1.00 1.00 1.200 1.00 1.00 1.15 0.0 0 .00 0.0 0.0 Length = 18 .50 ft 1 0.185 0.039 1.60 1.00 1.00 1.00 1.200 1.00 1.00 1.15 0.40 367 .7 1,987 .2 0.08 11 .3 288 .0 /0 CODE REFERENCES Calculations per NOS 2018, IBC 2021 , ASCE 7-16 Load Combination Set : ASCE 7-16 Material Properties Project Title: Engineer : Project ID : Project Oeser: Analysis Method : Allowable Stress Design Load Combination • ASCE 7-16 Fb + 900 .0 psi 900 .0 ps i E : Modulus of Elasticity Fb -Ebend-xx 1 ,600 .0ksi Fe-Prll Fe-Perp Fv 1,350 .0 psi 625 .0psi 180.0psi 575.0psi Eminbend-xx 580 .0ksi Wood Species Wood Grade Douglas Fir-Larch No .2 Ft Beam Bracing Beam is Fully Braced aga inst lateral-torsional buckling r· ····-·---·------.. ·-.. --·-·-·-.. -·-----·----.. 0(0.08) Lr(0.08) 6 x8 Span =9 .50 ft Density 31 .210pcf Applied Loads Service loads entered . Load Factors will be applied for ca lculations . Beam self weight calculated and added to loading Uniform Load : D = 0 .020, Lr = 0.020 ksf, Tributary Width= 4 .0 ft , (Roof Loads) DESIGN SUMMARY i Maximum Bending Stress Ratio = 0 .394 1 Maximum Shear Stress Ratio I Section used for this span 6x8 Section used for this span 1 fb : Actual = 443 .55psi fv : Actual I F'b = 1 ,125.00psi F'v I Load Combination +D+Lr Load Combination I ! Location of maximum on span = 4.750ft Location of maximum on span Span # where maximum occurs = Span# 1 Span #where maximum occurs Maximum Deflection Max Downward Transient Deflection 0.048 in Ratio= 239 1 >=360 Span : 1 : Lr Only Max Upward Transient Deflection 0 in Ratio= 0<360 nla Max Downward Total Deflection 0 .101 in Ratio= 1132>=180 Span: 1 : +D+Lr Max Upward Total Deflection 0 in Ratio= 0<180 n/a Maximum Forces & Stresses for Load Combinations Load Combination Segment Length DOnly Length = 9 .50 ft +D+Lr Length = 9 .50 ft +D+0 .750Lr Length = 9 .50 ft +0.60D Length = 9 .50 ft Max Stress Rallos Span # M V CD CM 0 .288 0 .082 0 .90 1.00 1.00 1.00 1.00 1.00 1.00 0 .394 0 .113 1.25 1.00 1.00 1.00 1.00 1.00 1.00 0 .348 0 .099 1.25 1.00 1.00 1.00 1.00 1.00 1.00 1 0 .097 0 .028 1.60 1.00 1.00 1.00 Moment Values Cfu M fb 1.000 1.00 1.00 1.00 1.00 233.5 1.000 1.00 1.00 1.00 1.000 1.00 1.00 1.00 1.91 443.5 1.000 1.00 1.00 1.00 1.000 1.00 1.00 1.00 . 1.68 391.0 1.000 1.00 1.00 1.00 1.000 1.00 1.00 1.00 0 .60 140.1 = = = = = F'b 0 .0 810 .0 0 .0 1,125.0 0 .0 1 '125.0 0 .0 1,440 .0 Design OK 0 .113 : 1 6x8 25.35 psi 225 .00 psi +D+Lr 8 .876ft Span# 1 Sflear Values v fv F'v 0 .00 0 .0 0 .0 0 .37 13.3 162.0 0 .00 0 .0 0 .0 0.70 25 .3 225 .0 0 .00 0 .0 0.0 0 .61 22 .3 225 .0 0.00 0 .0 0 .0 0.22 8 .0 288 .0 Jl Overall Maximum Deflections Load Combination Span +D+Lr Vertical Reactions Load Combination Max Upward from all Load Cond1t1ons Max Upward from Load Combinations Max Upward from Load Cases DOnly +D+Lr +D+0 .750Lr +0 .600 Lr Only Project Title : Engineer : Project 10: Project Oeser: Project File: SA Evergreen.ec6 VP HOME (c) ENERCALC INC 1983-2023 Max. "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span 0.1007 4 .785 0.0000 0.000 Support notation : Far left is #1 Values in KIPS Support 1 Support 2 0.802 0.802 0.802 0.802 0.422 0.422 0.422 0.422 A ,[poLt £P 0.802 0.802 0.707 0.707 0.253 0.253 I{ k ~ 7w:> J:4( ~ 2-Lf J7 0.380 0.380 IV " UNIFORM AND POINT LOAD ON CONTINUOUS FOOTING Footing Width (FW) = Footing Depth (FD) = Soil Bearing (SB) = Max. Soil Bearing = Plain Concrete Design : F'c= Tension Fb = Procedures: 12 in 12 in 1,500 psf 1,500 psf 2 ,500 psi 80 psi Fsoil = ((D-FD)/12*1D)+SB F'soil = Fsoii-(D/12*(150-110)) w = W*F'soil/12 w (") 12 X 12 X 15 X 18 X 21 X 24 X 12 X 15 X 18 X 21 X 24 X 12 X 15 X 18 X 21 X 24 X 12 X 15 X 18 X 21 X 24 X 12 X 15 X 18 X 21 X 24 X 30 X M = Fb*W*d"2/12"/6 L = (2 *M/w)"1/2 Pmax = 2*L*w D (") Fsoil (psf) F'soil (psf) 5 1,500 1 ,483 12 1,500 1,460 12 1,500 1,460 12 1 500 1,460 12 1 ,500 1 ,460 12 1,500 1,460 15 1,500 1,450 15 1 ,500 1 ,450 15 1,500 1,450 15 1,500 1,450 15 1,500 1,450 18 1,500 1,440 18 1,500 1,440 18 1,500 1 440 18 1·,500 1,440 18 1,500 1,440 21 1 ,500 1,430 21 1,500 1,430 21 1,500 1,430 21 1 ,500 1,430 21 1 ,500 1,430 24 1 500 1,420 24 1 500 1,420 24 1,500 1,420 24 1,500 1,420 24 1 ,500 1 ,420 24 1,500 1,420 Soil Density = Concrete Density= Inc . Width (IW) = Inc . Depth (ID) = w {#/ft} M ('#) 1,483 333 1,460 1,920 1,825 2 ,400 2 ,190 2 880 2 ,555 3 ,360 2 ,920 3 ,840 1,450 3 ,000 1 ,813 3,750 2 ,175 4,500 2 ,538 5 ,250 2 ,900 6,000 1,440 4,320 1,800 5,400 2 ,160 6 ,480 2 ,520 7 ,560 2 ,880 8 ,640 1,430 5 ,880 1,788 7 ,350 2 ,145 8 ,820 2 ,503 10,290 2 ,860 11,760 1 ,420 7,680 1 ,775 9 ,600 2 ,130 11 ,520 2 ,485 13 ,440 2,840 15 ,360 3 ,550 19,200 110 pcf 150 pcf 0 psf 0 psf L (ft) Pmax {#} 0.67 1,989 1.62 4 ,736 1.62 5,919 1.62 7103 1.62 8 ,287 1.62 9,471 2 .03 5 ,899 2.03 7,374 2.03 8 ,849 2 .03 10,324 2 .03 1~ 2.45 /7055 2.45 \~8 2.45 10 ,582 2.45 12 ,345 2.45 14,109 2 .87 8,202 2.87 10,252 2.87 12 ,302 2.87 14,353 2.87 16,403 3.29 9 ,340 3.29 11 ,676 3.29 14,011 3 .29 16 ,346 3 .29 18 ,681 3.29 23,351 Note : For point loads on footings with uniform loads , take the difference between "w" above and the uniform load , then multiply by two and by "L" above for P'max. 1:1.<. -~ POINT LOAD ON SQUARE PAD FOOTING Footing Depth (FD) = Soil Bearing (SB) = Max. Soil Bearing = 12 in 1500 psf 1500 psf Soil Density = Concrete Density = Inc. Width (IW) = Inc. Depth (ID) = w (") 12 12 15 18 21 24 18 21 24 30 18 21 24 30 33 36 30 36 42 36 42 48 54 60 66 72 78 84 Plain Concrete Design: L (") 12 12 15 18 21 24 18 21 24 30 18 21 24 30 33 36 30 36 42 36 42 48 54 60 66 72 78 84 F'c = Tension Fb = Procedures: 2,500 psi 80 psi Fsoil = ((D-FD)/12*1D)+SB F'soil = Fsoii-(D/12*(150-11 0)) A= W*L Pmax = F'soil* A D (") Fsoil (psf) F'soil (psf) 5 1,383 1,367 12 1,500 1,460 12 1,500 1,460 12 1,500 1,460 12 1,500 1,460 12 1,500 1,460 15 1,550 1,500 15 1,550 1,500 15 1,550 1,500 15 1,550 1,500 18 1,600 1,500 18 1,600 1,500 18 1,600 1,500 18 1,600 1,500 18 1,600 1,500 18 1,600 1,500 21 1,650 1,500 21 1,650 1,500 21 1,650 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 24 1,700 1,500 A1!fl 1.00 1.00 1.56 2.25 3.06 4.00 2 .25 3.06 4.00 6.25 2.25 3.06 4.00 6 .25 7.56 9.00 6 .25 9 .00 12.25 9.00 12.25 16.00 20.25 25.00 30 .25 36.00 42.25 49 .00 110 pcf 150 pcf 200 psf 200 psf Pmax {#) Reinforce 1,367 2-#4 e.w . 1,460 2-#4 e.w . 2,281 3-#4 e.w. 3,285 3-#4 e.w. 4,471 3-#4 e.w. 5,840 3-#4 e.w. 3,375 3-#4 e.w. 4,594 3-#4 e.w. 6,000 3-#4 e.w. 9,375 4-#4 e.w. 3,375 3-#4 e.w. 4,594 3-#4 e.w. 6,000 3-#4 e.w. 9,375 4-#4 e.w. 11,344 4-#4 e.w. 13,500 4-#4 e.w. 9,375 4-#5 e.w. 13,500 4-#5 e.w. 18,375 5-#5 e.w. 13,500 4-#5 e.w. 18,375 5-#5 e.w. 24,000 5-#5 e.w . 30,375 5-#5 e.w. 37,500 6-#5 e.w. 45,375 6-#5 e.w. 54,000 7-#5 e.w. 63,375 7-#5 e.w. 73,500 8-#5 e.w . lq O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Submittal Criteria Form Required for Single Family or Duplex Residences (Use Commercial form for lots with 3+ dwelling units or new residential tracts) Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification. Project Information  New Single Family Residence/Duplex  Addition/Remodel  ADU  Other Address: Unit #: City or Unincorporated County Area: ZIP: Scope of Work: Existing Area: Area to be Added: Total Resulting Area: Stories: Area Added in Past 2 Years (excluding this project): Yes No Questionnaire OCFA Plan Type if “Yes” 1.   New – Is this a new single family residence or duplex? *(PR160) Residential Site with Water Availability (PR400-402) Fire Sprinkler 2.   ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has fire sprinklers or a house that will have fire sprinklers added as part of this project? (PR400-402) Fire Sprinkler 3.   Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire sprinkler retrofit based on a threshold set by local ordinance? (PR400-402) Fire Sprinkler 4.   Distance – Is the most remote portion of the addition, ADU or other detached structure greater than 140-feet from the fire access roadway? *(PR160) Residential Site 5.   Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non- sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet? *(PR160) Residential Site with Water Availability 6.   Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed contractor to determine if a fire sprinkler modification is needed. (PR400-402) Fire Sprinkler 7.   Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold set by local ordinance? *(PR160) Residential Site (PR400-402) Fire Sprinkler 8.   Gate – Is a gate being installed across a driveway or road that is designated as a fire department access roadway, or a driveway or road that serves more than a single home/duplex? (PR180) Gate 9.   Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000 sf, and ADU’s). *(PR160) Residential Site *(PR172-174) Methane Test/Mitigation Plans 10.   Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation, or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as defined by the State, or (D) near an area that could be affected by a wildfire in the open space. *(PR125) Fuel Modification (PR182) Accessory Structure *OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals. Applicant Certification I certify, under penalty of perjury, under the laws of the State of California, that the information above is true: Print Name:_______________________________________ Signature:___________________________________________ Date:______________ Phone Number:_____________________________________________ Email:_____________________________________________________________ Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required. ______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes” and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination. For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100 SFR O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City Official Requesting Review: City Reference #: __________________________ City / County: _____________________________________ Date: __________________________________ Contact Name: _____________________________________ E-Mail: __________________________________ Title: _____________________________________ Phone #: _________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County: OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ OCFA Authorization Updated: 06/02/2020 rs O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Submittal Criteria Form Required for Single Family or Duplex Residences (Use Commercial form for lots with 3+ dwelling units or new residential tracts) Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification. Project Information  New Single Family Residence/Duplex  Addition/Remodel  ADU  Other Address: Unit #: City or Unincorporated County Area: ZIP: Scope of Work: Existing Area: Area to be Added: Total Resulting Area: Stories: Area Added in Past 2 Years (excluding this project): Yes No Questionnaire OCFA Plan Type if “Yes” 1.   New – Is this a new single family residence or duplex? *(PR160) Residential Site with Water Availability (PR400-402) Fire Sprinkler 2.   ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has fire sprinklers or a house that will have fire sprinklers added as part of this project? (PR400-402) Fire Sprinkler 3.   Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire sprinkler retrofit based on a threshold set by local ordinance? (PR400-402) Fire Sprinkler 4.   Distance – Is the most remote portion of the addition, ADU or other detached structure greater than 140-feet from the fire access roadway? *(PR160) Residential Site 5.   Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non- sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet? *(PR160) Residential Site with Water Availability 6.   Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed contractor to determine if a fire sprinkler modification is needed. (PR400-402) Fire Sprinkler 7.   Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold set by local ordinance? *(PR160) Residential Site (PR400-402) Fire Sprinkler 8.   Gate – Is a gate being installed across a driveway or road that is designated as a fire department access roadway, or a driveway or road that serves more than a single home/duplex? (PR180) Gate 9.   Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000 sf, and ADU’s). *(PR160) Residential Site *(PR172-174) Methane Test/Mitigation Plans 10.   Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation, or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as defined by the State, or (D) near an area that could be affected by a wildfire in the open space. *(PR125) Fuel Modification (PR182) Accessory Structure *OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals. Applicant Certification I certify, under penalty of perjury, under the laws of the State of California, that the information above is true: Print Name:_______________________________________ Signature:___________________________________________ Date:______________ Phone Number:_____________________________________________ Email:_____________________________________________________________ Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required. ______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes” and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination. For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100 SFR O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City Official Requesting Review: City Reference #: __________________________ City / County: _____________________________________ Date: __________________________________ Contact Name: _____________________________________ E-Mail: __________________________________ Title: _____________________________________ Phone #: _________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County: OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ OCFA Authorization Updated: 06/02/2020 rs CITY OF SANTA ANA SpNTA 4Aq Planning and Building Agency z - 0 � Certificate of Compliance 5105 5� Payment of School Facility Fees Approved °scHoo��� Santa Ana Unified School District FOR PERMIT ISSUANCE Building Name (First, MI, La t) T lephone Master ID: Project Address Tract/Parcel Number _ AC�,� �CAOCA �A 1 Cirg, State, Zi� CIode Name (First, MI, Last) I Telephone Use of Building (check) Type of Project (check) Residential Commercial ❑ Senior Housing ❑ NewU Addition ❑ Alteration ❑ Description of Project :Z�RV,cy-"O'n Number of Square Feet of Residential Space �� Sq.Ft x $ Total $ I (Dev. Fee) Number of Square Feet of Commercial Space Sq.Ft x $ (Dev. Fee) Total $ The above representations as to square footage are true. Applicant agrees that if it is later determined that such representations are not true, then this certificate shall automatically terminate, and the appropriate City/County shall be notified. Applicant is hereby noticed that any party filing a protest regarding the imposition of fees pursuant to Government Code Section 53080 must do so within 90 days from the payment of the fee. A.A r c; -� Applicant Name (Please Print) Date Signat e This certifies that the above -named Applicant has paid school facility fees in compliance with all existing and applicable sections of the Gover t Code and Education Code. Santa A a Unified ool District Authorized Representative Date DISTRIBUTION White - City/Count) Canary - Applicant Pink - Facilities Page 1 of 1 EXISTING ONE & TWO FAMILY DWELLINGS ELECTRICAL SERVICES UNDERGROUND EXCEPTION CEC 2022 ELC-04 All new utility connections are required to be installed below grade by Santa Ana Municipal Code 41- 626(b). There is a standing exception for one and two family dwellings. This exception applies only when the new electrical service is designed to be fed from below grade as well as overhead. This diagram is a typical unit. The utility is able to feed this cabinet from the top or the bottom without interfering with the distribution wiring. All the circuit breakers and branch circuits are contained in the circuit breaker side of this cabinet. Only listed combination overhead and underground feed service boxes may be used to connect to an overhead utility drop. This exception to an underground fed service applies only to existing single family and two family residences. Planning & Building Agency Permits & Plan Check Section 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 Rigid Conduit Service Entrance Conductor Riser Underground Service Lateral METER Rev. 1/21/2020