My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1702 S Garnsey St & Unit #2 - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Garnsey St
>
1702 S Garnsey St
>
1702 S Garnsey St & Unit #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:18 AM
Creation date
2/13/2026 5:01:11 AM
Metadata
Fields
Template:
Plan
Permit Number
101121988
101121989
Full Address
1702 S Garnsey St
1702 S Garnsey St Unit# 2
Street Number
1702
Street Direction
S
Street Name
Garnsey
Street Suffix
St
Unit Number
2
Document Relationships
101121988 - Permit
(Permit - Plan)
Path:
\Building\Permits\G\Garnsey St\1702 S Garnsey St
101121989 - Permit
(Permit - Plan)
Path:
\Building\Permits\G\Garnsey St\1702 S Garnsey St Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AREA COMPUTATION: <br />EXISTING MAIN HOUSE <br />EXISTING MAIN HOUSE FRONT PORCH <br />EXISTING TWO-CAR GARAGE <br />PROPOSED NEW DETACHED ADU <br />TOTAL COVERED AREA: <br />LOT SIZE: <br />TOTAL COVERED AREA: <br />TOTAL COVERED AREA PERCENTAGE: <br />1,313.00 SQ.FT. <br /> 135.00 SQ.FT. <br /> 380.00 SQ.FT. <br /> 408.00 SQ.FT. <br />2,236.00 SQ. FT <br />6,825.00 SQ FT <br />2,236.00/6,825.00 <br />=.33 x 100 = 33% <br />SCOPE OF WORK <br />1.PROPOSED NEW DETACHED ADU <br />2.RELOCATING THE 2'-6" GARAGE DOOR TO EAST WALL <br />3.LEGALIZATION OF UPGRADED WINDOWS ON EXISTING HOUSE <br />4.AS-BUILT COVERED PATIO TO BE LEGALIZED <br />5.PROPOSED NEW 5'-6" BLOCK WALL <br />6.CORNER PART OF THE EXISTING 5'-6" BLOCK WALL TO BE <br />ALTERED TO 3' PER LEGAL REQUIREMENT <br />7.EXISTING ELECTRICAL METER TO BE UPGRADED TO 200 AMPS <br />(100 AMPS FOR THE MAIN HOUSE AND 100 AMPS FOR THE ADU) <br />REVISION DATE <br />SCALE: <br />1761 THIRD ST. SUITE 102 <br />NORCO, CA. 92860 <br />OFFICE PH: (951) 407-1131 <br />DATE PROJECT NO. <br />DATE PROJECT: <br />DESIGNER: <br />SHEET No: <br />DATE: <br />DRAWN BY: <br />OWNER: <br />ADDRESS: <br />A.P.N.: <br />1 <br />2 <br />3 <br />DATE SHEET: <br />NOTE: <br />TITLE: <br />CONTENT: <br />4 <br />5 <br />6 <br />SHEET <br />ELVIRA KENNEDY <br />MARCH 17, 2025 <br />A-1 <br />IRMA DE LA TORRE <br />1702 S. GARNSEY ST. <br />SANTA ANA, CA 92707 <br />013-244-01 <br />PROPOSED NEW <br />DETACHED ADU, <br />LEGALIZATION OF <br />WINDOWS & COVERED <br />PATIO, PROPOSED NEW & <br />MODIFICATION TO <br />CONCRETE WALL <br />PROJECT DATA <br />A.P.N: <br />YEAR BUILT: <br />ZONING: <br />DESIGNER: <br />LEGAL DESCRIPTION: <br />CITY: <br />COUNTY: <br />STATE: <br />CONSTRUCTION TYPE: <br />OCCUPANCY GROUP: <br />NUMBER OF STORIES: <br />FIRE SPRINKLERS: <br />APPLICABLE CODES: <br />013-244-01 <br />1953 <br />SINGLE FAMILY RESIDENTIAL <br />INNOVATION GROUP <br />N TR 1888 LOT 72 <br />SANTA ANA <br />ORANGE COUNTY <br />CA <br />TYPE V-B <br />R-1 <br />ONE <br />NO <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA RESIDENTIAL CODE <br />2022 GREEN BUILDING STANDARDS CODE <br />2022 CALIFORNIA ENERGY CODE <br />BUILDING SUMMARY <br />SHEET INDEX <br />A-1.COVER SHEET <br />A-2.EXISTING SITE PLAN <br />A-3.EXISTING HOUSE & GARAGE FLOOR PLAN <br />A-4. MAIN HOUSE WINDOW PLAN <br />A-5.EXISTING HOUSE & GARAGE ROOF PLAN <br />A-6.EXISTING HOUSE ELEVATIONS <br />A-7.EXISTING GARAGE ELEVATIONS <br />A-8.NEW SITE PLAN <br />A-9.COVERED PATIO FLOOR, ROOF & ELEVATIONS PLAN <br />A-10.CONCRETE WALL FLOOR & ELEVATIONS PLAN <br />A-11.NEW ADU FLOOR PLAN <br />A-12. NEW ADU ROOF PLAN <br />A-13.NEW ADU ELEVATION & SECTION PLAN <br />SPEC-1.SPECIFICATION SHEET <br />CG-1.CALL GREEN RESIDENTIAL REQUIREMENTS <br />CG-2.CALL GREEN RESIDENTIAL REQUIREMENTS <br />E-1.NEW ADU ELECTRICAL PLAN <br />P-1.NEW ADU PLUMBING & WASTE PLAN <br />S1.0.STRUCTURAL NOTES <br />S1.1.TYPICAL NOTES <br />S1.2.TYPICAL DETAILS <br />S1.3.TYPICAL DETAILS <br />S2.0.FOUNDATION PLAN <br />S2.2.ROOF FRAMING PLAN <br />S.3.0.FOUNDATION DETAILS <br />S5.0.ROOF FRAMING DETAILS <br />T-24.1.ENERGY CALCULATION PG1 <br />T-24.2.ENERGY CALCULATION PG2 <br />T-24.3.ENERGY CALCULATIONS PG3 <br />GENERAL NOTES <br />·ALL EXISTING/PROPOSED IMPERVIOUS STORM WATER RUNOFF WILL <br />BE ROUTED TO LANDSCAPE AREAS OR PLANTER BOXES PRIOR TO <br />REACHING THE PUBLIC DRAIN SYSTEM <br />·THE EXISTING STRUCTURES MAY HAVE EXPERIENCED SETTLEMENT <br />OR MOVEMENT OVER THE YEARS IN SERVICE WHICH MAY CREATE <br />DISCREPANCIES IN FIELD MEASUREMENTS SHOWN ON PLANS. <br />·NO MAJOR ALTERATIONS SHALL BE MADE TO THE EXISTING GRADING. <br />ALL GRADING SHALL SLOPE A MINIMUM 2% FROM THE NEW ADDITION. <br />·PEDESTRIANS SHALL BE PROTECTED DURING CONSTRUCTION, <br />REMODELING AND DEMOLITION ACTIVITIES AS REQUIRED BY LATEST <br />EDITION OF CBC. <br />·CONTRACTOR OR HOMEOWNER SHALL CALL "DIGALERT" PRIOR TO <br />ANY WORK ON SITE TO VERIFY THE LOCATION OF EXISTING UTILITIES <br />ON SITE. <br />·IT SHALL BE THE GENERAL CONTRACTORS RESPONSIBILITY TO HAVE <br />GRADING, COMPACTION, BACK FILLING, FOOTING AND UTILITY <br />INSPECTIONS COMPLETED PRIOR TO BEGINNING THE NEXT PHASE OF <br />CONSTRUCTION. <br />·SEPARATE PERMIT IS REQUIRED FOR EACH BUILDING OR STRUCTURE <br />I.E. FENCE WALLS, RETAINING WALLS, TRASH ENCLOSURES, <br />PLANTERS, SWIMMING POOLS/SPAS. <br />·THESE DRAWINGS AND LAYOUTS ARE NOT TO BE REPRODUCED OR <br />COPIED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF <br />INNOVATION GROUP. <br />·GAS METER WILL NOT BE INSTALLED. ALL APPLIANCES AND HVAC WILL <br />BE ELECTRICAL <br />·MANDATORY SOLAR PV SYSTEM REQUIRED TO BE UNDER SEPARATE <br />SUBMITTAL AND PERMIT <br />·THE APPLICANT/PROPERTY OWNER SHALL BE RESPONSIBLE FOR <br />CONFIRMING ALL EXISTING UTILITY EASEMENTS AND/OR CLEARANCE <br />ON-SITE THAT MAY AFFECT THE PROJECT <br />VICINITY MAP <br />COVER <br />CAMERON DE LA TORRE <br />OWNER: <br />IRMA & CAMERON DE LA TORRE <br />1702 S. GARNSEY ST. <br />SANTA ANA, CA 92707 <br />(323) 899-9345 <br />BUILDING ENERGY ANALYSIS REPORT: <br />TITLE-24 <br />INNOVATION GROUP <br />ADULFO KENNEDY <br />1761 THIRD ST. SUITE 102 <br />NORCO, CA. 92860 <br />(951) 536-5609 <br />CONSULTANTS <br />31 <br />4 <br />' <br />- <br />0 <br />" <br />56 <br />4 <br />' <br />- <br />0 <br />" <br />458'-0" <br />TRANSIT MAP <br />3/16" = 1'-0" <br />NOTES <br />·MECHANICAL, ELECTRICAL AND PLUMBING ARE NOT PART OF THIS <br />PLAN REVIEW AND APPROVAL. MEP ARE SUBJECT TO BUILDING FIELD <br />INSPECTION <br />·MINIMUM 1.72 (KW) PHOTOVOLTAIC SYSTEM WILL BE ISSUED PRIOR TO <br />BUILDING FRAME INSPECTION REQUEST. <br />Bldg #'s 101121988 & 101121989 <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - G. Huang <br />POLICE - B. Martin <br />PUBLIC WORKS - B. Sarlak
The URL can be used to link to this page
Your browser does not support the video tag.