Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1407 N King St - Plan
Sht # 0.1 of 3 Note to Plan Checker: This calculations package shows the structural calculations of the existing 2x4 stud to support the proposed residential battery/ies (Enphase IQ Battery 5P) that fixed with 5/16" lag screws, as shown on sheet PV 3 of the System Design Design Drawings. 2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 202320232613 Solar Deployed Lorne Leech Residence20241415 ESP Eduardo Aguirre Battery that are fixed with 5/16" lag screws, as shown on sheet S.03 of the System Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 2187 Date: May 7, 2025 Date: May 9, 2025 Date: May 12, 2025 Date: May 22, 2025 Date: May 27, 2025Date: June 2, 2025Date: June 6, 2025Date: June 9, 2025Date: June 10, 2025Date: June 23, 2025Date: June 24, 2025 Date: September 2, 2025 Date: September 10, 2025 Date: September 16, 2025 Date: September 29, 2025 Date: September 30, 2025 Date: October 1, 2025 Date: October 6, 2025 Date: October 10, 2025 Date: October 13, 2025 Date: October 17, 2025 Date: October 20, 2025 Date: October 21, 2025 Date: October 24, 2025 Date: October 29, 2025 Date: November 5, 2025 Date: November 7, 2025 Date: December 4, 20252026-0037 TG Roofing Abraham Brito Date: January 26, 2026 Structural Calculations for a Residential Battery with Optional Export System for: Applicable Codes: 2025 California Building Code, 2025 California Electric Code, 2025 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-22 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2024 National Design Specification for Wood Constructione, and all other codes which are adopted by reference or enacted by law. Sht # 1 of 3 2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 2020 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 20222022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 2023 Scott Berger Residence 5 Ponte Bianco, Lake Elsinore, CA 92532 Abraham Brito 1407 N King St Santa Ana, CA 92706 2026-0037 TG Roofing Abraham Brito Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 2187 Date: May 5, 2025 Date: May 9, 2025 Date: May 12, 2025 Date: May 19, 2025 Date: May 21, 2025 Date: May 22, 2025 Date: May 27, 2025Date: June 2, 2025Date: June 6, 2025Date: June 9, 2025Date: June 10, 2025Date: June 23, 2025Date: June 24, 2025Date: July 9, 2025 Date: August 1, 2025 Date: September 2, 2025 Date: September 10, 2025 Date: September 16, 2025 Date: September 29, 2025 Date: September 30, 2025 Date: October 1, 2025 Date: October 6, 2025 Date: October 10, 2025 Date: October 13, 2025 Date: October 15, 2025 Date: October 21, 2025 Date: October 24, 2025 Date: October 29, 2025 Date: November 5, 2025 Date: November 7, 2025 Date: January 26, 2026 Loading Diagram Sht # 2 of 3 Determine Applied Loads F y = Weight of Equipment = 174 lbs 2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 20202020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 2020 Check attachment of Support to (E) 2x4 Stud for Seismic Load F x =F p F p =0.4 ap SDS Wp Rp / Ip [1 + 2(z/h)]x ap SDS =1.0 =(2/3) SMS ; SMS = Fa Ssx ; Fa =1.0 ; Ss =1.25 SMS = 1.25 SDS =(2/3) 1.25 =0.83 Wp =174 lbs Rp =2.5 [Table 13.61 ASCE 7-22] [Table 13.61 ASCE 7-22] ; Ip =1.0 ; z / h =1.0 Total Fy Total Fx R1x R2x 3.75" 16.75" 2020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 2022 16.75" 2022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 202320241415 ESP Eduardo Aguirre Battery Date: June 7, 2024 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 2187 Date: May 19, 2025 Date: May 21, 2025 Date: May 27, 2025Date: June 2, 2025Date: June 6, 2025Date: June 10, 2025Date: June 23, 2025Date: July 9, 2025 Date: August 1, 2025 Date: September 10, 2025 Date: September 16, 2025 Date: September 29, 2025 Date: September 30, 2025 Date: October 1, 2025 Date: October 6, 2025 Date: October 10, 2025 Date: October 13, 2025 Date: October 15, 2025 Date: October 17, 2025 Date: October 20, 2025 Date: December 4, 20252026-0037 TG Roofing Abraham Brito Date: January 26, 2026 Sht # 3 of 3 2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019 9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Loyd W. Martin Professional Engineer, Inc. 2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 20202020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 2020 Load per bolt per strut P = Rx / 2 P = 54.6 lbs / 2 = 27.3 lbs Determine Applied Loads (cont...) Fpmax =1.6 SDS Ip Wp =231 lbs Fpmin =0.3 SDS Ip Wp =43 lbs Fpmin <Fp <Fpmax OK F p =0.4 (1.0) (0.83) (174 lbs) (2.5 / 1) [1 + 2(1)]x F p =70 lbs R1x (33.5") F y (3.75") Fp (16.75") = 0 Check Moment at R2: R1x = (Fp x 16.75" + Fy x 3.75") / 33.5" R1x = (1,172.5 lbf-in + 656 lbf-in) / 33.5 in R1x = 54.6 lbs Determine allowable load per 5/16" lag screw w/ 3" min. embedment into 2x4 stud per 2024 NDS. W ' = W x Cd x Ct Table 10.3.1 2024 NDS where: W = 266 lbs / in. of embedment per Table 12.2a Cd = 1.6 per Table 2.3.2 of 2024 NDS Ct = 1.0 per Table 10.3.4 of 2024 NDS W ' = 266 lbs/ in. x 3 in. x 1.6 x 1.0 = 1,277 lbs > 27.3 lbs OK Check for withdrawal of each bolt: 2020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 20222022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 202320231967 Magic Solar Scott Berger Residence Date: March 28, 20232023-1967 Magic Solar Scott Berger Residence Date: June 15, 202320232613 Solar Deployed Lorne Leech Residence20231967 Magic Solar Scott Berger Residence Date: July 4, 202320233935 Berger Solar Nathan Heit Battery Date: July 4, 202320233834 Solar Renewable Energy Amador Medina Battery Date: July 12, 202320234478 Solar Deployed David Herrera Battery Date: August 10, 202320235069 Devil Dog Energy Ralph Gillespie Battery Date: October 07, 2023LWM SSE 20235382 Solar Deployed Maria Viridiana Battery Date: November 4, 202320240203 Solar Depoyed Donald Trapp Battery Date: January 22, 202420240331 ESP Blanca Ambriz Battery Date: February 6, 202420240386 ESP Gustavo Silva Residence Date: February 09, 202420240394 Solar Deployed Arlene Twine Residence Date: February 09, 202420240396 Smart House Peggy Garcia Date: February 9, 202420240466 Solar Deployed Anthony Britt Date: February 20, 202420240527 Solar Deployed Bridget Zuniga Date: February 26, 202420240428 Papke Designs Carlos Gonzalez Date: February 26, 202420240528 Solar Deployed Ricky Desingano Date: February 26, 202420240529 Solar Deployed George Quevedo Date: February 26, 202420240802 Solar Deployed Alex Usher Date: March 22, 202420240866 ESP Margie Collins Battery Date: March 29, 202420240867 ESP Mark Lane Battery Date: March 29, 202320240877 ESP Phillip Clanton Battery Date: March 29, 202320240879 Solar Deployed James Leu Battery Date: March 29, 202320240983 ESP Larry Serota Battery Date: April 06, 202420240991 Velasco's Electrical Juan Ochoa Battery Date: April 09, 202320241018 Velasco's Electrical Kara Herron Battery Date: April 10, 202320241009 ESP Kendra Flores Battery Date: April 10, 202420241010 ESP Belia Flores Battery Date: April 10, 202420241022 Velasco's Electrical Bia Moua Battery Date: April 11, 202320241026 ESP John Schulte Battery Date: April 11, 202420241034 ESP David Morehead Battery Date: April 11, 202420241050 ESP Oscar Gama Battery Date: April 14, 202420241118 ESP Fernando Mercado Battery Date: April 22, 202420241143 Solar Deployed Mirna Gicel Garcia Battery Date: April 23, 20242020241150 Solar Deployed Andrea Davis Battery Date: April 23, 202420241157 ESP Yajaira Yanez Battery Date: April 24, 202420241166 ESP Grant Youn Battery Date: April 25, 202420241168 Solar Deployed Maria Abundes Residence Date: April 25, 202420241180 ESP Teruko Ogawa Residence Date: April 26, 202420241177 ESP Saul Diaz Battery Date: April 26, 202420241173 ESP Ruben Gonzalez Battery Date: April 26, 202420241184 Solar Deployed Mario Chavez Battery Date: April 26, 2024 20241193 Solar Deployed Carolyn Gatlin Residence Date: April 29, 2024 20241226 ESP Juan Castillo Residence Date: May 01, 202420241225 Velasco's Electrical Luis Anzueto Residence Date: May 01, 202420241262 ESP Jose Perez Battery Date: May 04, 202420241263 Velasco's Electrical Maria Bermudez Battery Date: May 06, 202420241264 ESP Palmira Tirado Battery Date: May 06, 202420241284 ESP Noel Guerra Battery Date: May 08, 202420241289 ESP Mary Margarette Agoncillo Battery Date: May 08, 202420241304 ESP Martin Vega Battery Date: May 09, 202420241315 ESP Elias Salmeron Battery Date: May 10, 202420241316 ESP Tull Merrily Battery Date: May 10, 202420241334 ESP Henry Berreondo Battery Date: May 12, 202420241324 Solar Deployed Adam Zamora Battery Date: May 12, 202420241383 Solar Deployed Enrique Soto Battery Date: May 16, 2024 20241398 ESP Javier Portillo Battery Date: May 17, 202420241413 ESP Antonio Picazo Battery Date: May 19, 202420241415 ESP Eduardo Aguirre Battery Date: May 20, 202420241415 ESP Eduardo Aguirre Battery Date: June 7, 2024 Date: June 14, 2024 Date: June 17, 2024 Date: June 20, 2024 Date: June 25, 2024 Date: June 26, 2024 Date: June 28, 2024 Date: July 2, 2024 Date: July 3, 2024 Date: July 5, 2024 Date: July 10, 2024 Date: July 16, 2024 Date: July 17, 2024 Date: July 19, 2024 Date: July 22, 2024 Date: July 23, 2024 Date: July 24, 2024 Date: July 26, 2024 Date: July 31, 2024 Date: August 1, 2024 Date: August 2, 2024 Date: August 15, 2024 Date: August 19, 2024 Date: August 20, 2024 Date: August 21, 2024 Date: August 22, 2024 Date: August 23, 2024 Date: August 27, 2024 Date: August 28, 2024 Date: August 29, 2024 Date: September 2, 2024 Date: September 4, 2024 Date: September 6, 2024 Date: September 11, 2024 Date: September 12, 2024 Date: September 13, 2024 Date: September 17, 2024 Date: September 20, 2024 Date: September 23, 2024 Date: October 2, 2024 Date: October 3, 2024 Date: October 4, 2024 Date: October 7, 2024 Date: October 8, 2024 Date: October 9, 2024 Date: October 10, 2024 Date: October 11, 2024 Date: October 14, 2024 Date: October 15, 2024 Date: October 16, 2024 Date: October 17, 2024 Date: October 18, 2024 Date: November 15, 2024 Date: November 18, 2024 Date: November 20, 2024 Date: November 21, 2024 Date: November 22, 2024 Date: November 25, 2024 Date: November 26, 2024 Date: November 27, 2024 Date: December 2, 2024 Date: December 3, 2024 Date: December 4, 2024 Date: December 5, 2024 Date: December 6, 2024Date: December 9, 2024Date: December 10, 2024Date: December 11, 2024Date: December 13, 2024Date: December 17, 2024Date: December 18, 2024Date: December 19, 2024Date: December 20, 2024Date: December 23, 2024Date: January 2, 2025Date: January 3, 2025Date: January 6, 2025Date: January 7, 2025Date: January 8, 2025Date: January 9, 2025Date: January 13, 2025Date: January 14, 2025Date: January 15, 2025Date: January 16, 2025Date: January 17, 2025Date: January 24, 2025Date: January 27, 2025Date: January 28, 2025Date: January 29, 2025Date: January 30, 2025Date: January 31, 2025Date: February 3, 2025Date: February 4, 2025Date: February 5, 2025Date: February 6, 2025Date: February 11, 2025 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 2187 Date: February 12, 2025Date: February 13, 2025Date: February 14, 2025Date: February 17, 2025Date: February 18, 2025Date: February 19, 2025Date: February 20, 2025Date: February 21, 2025Date: February 25, 2025Date: February 26, 2025Date: February 27, 2025Date: March 3, 2025Date: March 4, 2025Date: March 5, 2025Date: March 6, 2025Date: March 10, 2025Date: March 11, 2025Date: March 13, 2025Date: March 17, 2025Date: March 18, 2025Date: March 19, 2025Date: March 20, 2025Date: March 21, 2025Date: March 24, 2025Date: March 25, 2025Date: March 26, 2025Date: March 27, 2025Date: March 28, 2025Date: March 31, 2025 Date: May 5, 2025 Date: May 7, 2025 Date: May 12, 2025 Date: May 19, 2025 Date: May 21, 2025 Date: May 22, 2025Date: June 9, 2025Date: June 24, 2025Date: July 9, 2025 Date: August 1, 2025 Date: September 2, 2025 Date: October 15, 2025 Date: October 17, 2025 Date: October 20, 2025 Date: October 21, 2025 Date: October 24, 2025 Date: October 29, 2025 Date: November 5, 2025 Date: November 7, 2025 Date: December 4, 20252026-0037 TG Roofing Abraham Brito Date: January 26, 2026 Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: G.01 COVER1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10ALEX J. CLUCK Alex J. Cluckx THE BRITO RESIDENCE SOLAR (PV): 2.64kW DC 2.41kW CEC-AC W/ 5kWh BATTERIES (ESS) 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) www. Loyd W Martin .com Solar Structures Engineering #2026-0037 Structural Only January 26, 2026 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 2187 PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: G.02 GENERAL NOTES1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10ALEX J. CLUCK Alex J. Cluckx GENERAL NOTES •ALL MATERIAL(S), EQUIPMENT, INSTALLATION & WORK SHALL COMPLY W/ THE FOLLOWING APPLICABLE CODE(S): ••2025 CBC | 2023 IBC ••2025 CRC | 2023 IRC ••2025 CEC | 2023 NEC ••2025 CMC | 2023 UMC ••2025 CPC | 2023 UPC ••2025 CFC | 2023 IFC ••2025 BUILDING ENERGY CODE ••2025 CALGREEN •EXISTING PLUMBING VENT(S), SKYLIGHT(S), EXHAUST OUTLET(S) & VENTILATION INTAKE AIR OPENING(S) SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM •ALL EQUIPMENT SHALL BE LISTED & LABELED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY AND INSTALLED PER LISTING REQUIREMENTS & THE MANUFACTURER'S INSTRUCTION(S) [NEC 690.4(D)] •ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES & SWITCHES •ALL EQUIPMENT SHALL BE PROPERLY GROUNDED & BONDED IN ACCORDANCE W/ NEC ARTICLE 250 •ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVER CURRENT DEVICES LOCATED SO AS TO PROVIDE OVER CURRENT PROTECTION FROM ALL SOURCES [NEC 690.9(A)] •ADDITIONAL EQUIPMENT OF THE PV SYSTEM SHALL BE LOCATEDOUTSIDE OF THE BUILDING NEAR THE MAIN ELECTRICAL SERVICES [NEC 690.12(C)] •THE UTILITY INTERACTIVE INVERTER(S) SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION & DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THE SYSTEM & SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION & DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED [NEC 690.61] •DUE TO THE FACT THAT PV MODULES ARE ENERGIZED WHENEVER EXPOSED TO LIGHT, PV CONTRACTOR SHALL DISABLE THE ARRAY DURING INSTALLATION & SERVICE BY SHORT CIRCUITING, OPEN CIRCUITING, OR COVERING THE ARRAY W/ OPAQUE COVERING [NEC 690.18] •ALL CONDUCTOR EXPOSED TO WEATHER SHALL BE LISTED & IDENTIFIED FOR USE IN DIRECT SUNLIGHT [NEC 690.31(B), 310.8(D)] •THE MODULE CONDUCTORS MUST BE TYPE USE-2 OR LISTED PHOTOVOLTAIC (PV) WIRE [NEC 690.31(B)] •ALL CONDUCTORS SHALL BE MARKED ON EACH END FOR UNIQUE IDENTIFICATION [NEC 690.4(B)] •ALL GROUND CONDUCTORS SHALL BE PROPERLY COLOR IDENTIFIED PER [NEC 690.6(B)] •PV SYSTEM CONNECTED ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEANS IF THE OTHER SOURCE(S) AT ANY DISTRIBUTION EQUIPMENT ON THE PREMISES SHALL MEET THE FOLLOWING [NEC 705.12]: ••EACH SOURCE CONNECTION SHALL BE MADE AT THEDEDICATED CIRCUIT BREAKER OR FUSIBLE DISCONNECTING MEANS [NEC 705.12(D)(1)] ••THE SUM OF THE AMPERE RATING OF THE OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO THE BUSBAR OR CONDUCTOR SHALL NOT EXCEED 120% OF THE RATING OF BUSBAR OR CONDUCTOR [NEC 705.12(D)(2)] ••THE INTERCONNECTION POINT SHALL BE ON THE LINE SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT [NEC 705.12(D)(3)] ••EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUIT SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES [NEC 705.12(D)(4)] ••CIRCUIT BREAKER, IF BACKED, SHALL BE SUITABLE FOR SUCH OPERATION [NEC 705.12(D)(5)] •TO MINIMIZE OVERHEATING OF THE BUSBAR IN PANEL BOARD, THE PANEL BOARD MAIN CIRCUIT BREAKER & THE PV POWER SOURCE CIRCUIT BREAKER SHALL BE PHYSICALLY LOCATED AT THE OPPOSITE END OF THE BUSBAR [NEC 705.12(D)(7)] •ALL THE NEC REQUIRED WARNING SIGNS, MARKING, & LABELS SHALL BE POSTED ON EQUIPMENT & DISCONNECTS PRIOR TO ANY INSPECTIONS TO BE PERFORMED BY THE BUILDING DEPARTMENT INSPECTOR •METALLIC RACEWAYS OR METALLIC ENCLOSURES ARE REQUIREDWIRING METHOD FOR INSIDE A BUILDING FOR PV SYSTEM [NEC 690.31(E)] •FLEXIBLE, FINE-STRANDED CABLES SHALL BE TERMINATED ONLY W/ TERMINALS, LUGS, DEVICES OR CONNECTOR THAT ARE IDENTIFIED & LISTED FOR SUCH USE [NEC 690.31(F) & 110.14(A)] •CONNECTORS SHALL BE OF LATCHING OF LOCKING TYPE. CONNECTORS ARE READILY ACCESSIBLE & OPERATING OVER 30 VOLTS SHALL REQUIRE TOOL TO OPEN & MARK "DO NOT DISCONNECT UNDER LOAD" OR "NOT FOR CURRENT INTERRUPTING" [NEC 690.33(C) & (E)(2)] •EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES SMALLER THAN 6AWG SHALL BE PROTECTED FROM PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR [NEC 690.46 & 250.120(C)] •FINE-STRANDED CABLES USED FOR BATTERY TERMINALS, DEVICES, & CONNECTIONS REQUIRE LUGS & TERMINALS LISTED & MARKED FOR THE USE [NEC 690.74(A)] HOMEOWNER INFORMATION HOMEOWNER:ABRAHAM BRITOADDRESS:1407 N. KING ST. (ADU) CITY / STATE / ZIP: SANTA ANA | CA | 92706 PHONE NUMBER:-BUILDING TYPE:RESIDENTIAL - SFRNUMBER OF STORIES: 1 CONTRACTOR INFORMATION CONTRACTOR: T&G ROOFING AND SOLARADDRESS: 153 N 10TH ST. CITY / STATE / ZIP: UPLAND | CA | 91786 PHONE NUMBER: (909) 931-3204 CSLB LICENSE: #583458CSLB CLASS:B | C-39 | C-10 | HIC EQUIPMENT INFORMATION PV MODULES:(6) SILFAB: SIL-440 QD INVERTER(S):(6) ENPHASE: IQ8MC-72-M-US BATTERIES:(1) ENPHASE: IQBATTERY-5P-1P-NA MODULE AREA:21.00 FT.2 MODULE LENGTH: 67.80-IN. MODULE WIDTH:44.60-IN. MODULE WEIGHT: 46.30 LBS. TOTAL MODULE AREA: 126.00 FT.2 MOUNTING WEIGHT: 50.40 LBS.TOTAL INSTALL WEIGHT: 328.20 LBS. POINT LOAD PER MOUNT: 23.44 LBS. DISTRIBUTED WEIGHT: 2.60 P.S.F. ROOFING INFORMATION TYPE OF ROOF:COMPOSITION SHINGLES WIND SPEED:130 MPH EXPOSURE CATEGORY: C BUILDING CODE DATA (E) OCCUPANCY GROUP R3 (E) TYPE OF CONSTRUCTION V-B (E) SPRINKLERS NO APPLICABLE CODE •2025 BUILDING STANDARDS ADMINISTRATIVE CODEPART 1, TITLE 24, C.C.R.[2023 IBC W/ AMENDMENTS] •2025 CALIFORNIA BUILDING CODE [CBC]PART 2, TITLE 24, C.C.R.[2023 IBC W/ AMENDMENTS] •2025 CALIFORNIA ELECTRICAL CODE [CEC]PART 3, TITLE 24, C.C.R.[2023 NEC W/ AMENDMENTS] •2025 CALIFORNIA FIRE CODE [CFC]PART 9, TITLE 24 C.C.R. •2023 NATIONAL ELECTRICAL CODE NFPA 70 [NEC] SHEET INDEX G.01 COVER G.02 GENERAL NOTES S.01 SITE PLAN S.02 STRUCTURAL DETAILS S.03 ESS STRUCTURAL A.01 EQUIPMENT ELEVATION E.01 ELECTRICAL DETAILS E.02 ONE-LINE DIAGRAM E.03 ONE-LINE CALCULATIONS S.04 WARNING SIGNAGE *EQUIPMENT DATA-SHEETS ARE ATTACHED TO PACKET T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE www. Loyd W Martin .com Solar Structures Engineering #2026-0037 Structural Only January 26, 2026 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 2187 PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: S.01 SITE PLAN1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10 S EW PROPERTY SITE PLAN N ALEX J. CLUCK Alex J. Cluckx SOLAR (PV) COVERAGE # OF MODULES 6 MODULE FT.2 [+/-]126.00 ROOF AREA [+/-]1,650 COVERAGE (%)7.64 SCALE: 1/16" = 1'-0" SOLAR (PV) ARRAY INFORMATION A 1 18°297° N-W L A R R A Y T A G # O F M O D S . TI L T AZ I M U T H DI R E C T I O N O R I E N T A T I O N ENPHASE: IQ8MC-72-M-USMICRO-INVERTER GENERAL NOTES •A 36" PATHWAY SHALL BE PROVIDEDTO THE EMERGENCY ESCAPE ANDRESCUE OPENING •FOR BATTERIES; A LISTED DETECTORSHALL BE INSTALLED IN LOCATIONSWITHIN DWELLING UNITS ANDATTACHED GARAGES WHERE SMOKEALARM CANNOT BE INSTALLED PERCRC R328.7 T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) ENPHASE: IQBATTERY-5P-1P-NA 20A|240V (ESS #1) DRI V E W A Y 1405 N . K I N G S T . (E) SIN G L E - F A M I L Y R E S I D E N C E 1080 S Q . F T . 140 7 N . K I N G S T . A B C DRI V E W A Y DRIVEW A Y B 2 18° 207° S-W P C 3 18° 117° S-E P ENPHASE: COMBINER BOX 80A|240V AC DISCONNECT 60A|240VMAIN SERVICE PANEL | UTILITY 5'-0" 5'-0" 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE www. Loyd W Martin .com Solar Structures Engineering #2026-0037 Structural Only January 26, 2026 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 2187 MOUNTING DETAILS MOUNTING & RACKING GENERAL NOTES S EW STRUCTURAL LAYOUT N PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: S.02 STRUCTURAL1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10ALEX J. CLUCK Alex J. Cluckx •SEE ATTACHED MANUFACTURE DATA-SHEET(S) FOR RACKING SPECIFICATION(S) & MOUNTING INSTALLATION •ALL WIRING IN THE BUILDING / STRUCTURE TO BE INSTALLED IN CONDUIT •ALL CONDUIT MOUNTED ON THE EXTERIOR OF THE BUILDING SHALL BE SECURELY ATTACHED TO THE BUILDING •LABELS TO BE LOCATED AT THE METER ALTERING THE "PRESENCE OF AN ALTERNATE POWER SOURCE" AT THE SERVICE PANEL •EXISTING B-VENT TERMINATORS, FOR FUEL BURNING APPLIANCES, WHERE ADJACENT TO THE PROPOSED MODULES, MUST BE EXTENDED 12" ABOVE THE MODULES' TOP SURFACE TO COMPLY W/ CMC 802.6.2(1) & CPC 509.2(1) •EXISTING DWV PLUMBING VENT TERMINATORS, WHERE ADJACENT TO THE PROPOSED MODULES & MUST BE 12" MIN. FROM EDGE OF MODULES & BE EXTENDED 6" ABOVE THE MODULES' TOP SURFACE TO COMPLY W/ CPC 906.1 •TWO INDEPENDENT SUPPORT RAILS PER PANEL W/ PORTRAIT ORIENTATION, OR SHARED INTERMEDIATE RAILS W/ PANELS IN LANDSCAPE ORIENTATION •COLD WATER GROUNDING CONNECTED W/IN 5' OF POINT OF ENTRANCE OF WATER INTO HOUSE •RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END (CEC 250.64 (E)) •MAXIMUM END CANTILEVER OF ALUMINUM SUPPORT RAIL TO BE VERIFIED WHEN TABLE SPAN IS SUBMITTED. ALLOWABLE SPAN IN THE ROOF WIND PRESSURE ZONE OF THE CANTILEVER FOR DC EQUIPMENT INSTALLED ON THE ROOF, CONDUIT, WIRING SYSTEMS & RACEWAYS SHALL BE LOCATED AS CLOSE AS POSSIBLE TO THE RIDGE, HIP, OR VALLEY & SHALL RUN FROM THE RIDGE, HIP OR VALLEY DIRECTLY TO AN OUTSIDE WALL. DC COMBINER BOXES SHALL BE LOCATED SO AS TO MINIMIZE CONDUIT RUNS IN PATHWAYS BETWEEN ARRAYS. DC WIRING LOCATED INSIDE OF BUILDING SHALL BE METALLIC CONDUIT OR IN RACEWAYS & SHALL BE RUN ALONG THE BOTTOM OF LOAD BEARING STRUCTURAL FRAMING MEMBERS WHERE EVER FEASIBLE GENERAL NOTES •605.11.1 ACCESS & PATHWAYSROOF ACCESS, PATHWAYS & SPACINGREQUIREMENTS SHALL BE PROVIDEDIN ACCORDANCE W/ CFC 605.11.1 -605.11.1.3.4 'PATHWAYS SHALL BE OVER AREASCAPABLE OF SUPPORTING FIREFIGHTERS ACCESSING THE ROOF.PATHWAYS SHALL BE LOCATED INAREAS W/ MINIMAL OBSTRUCTIONSSUCH AS VENT PIPES, CONDUIT ORMECHANICAL EQUIPMENT' ROOF MEMBER DETAILS (TRUSS) •SIZE: 2 x 4 @ 24" O.C. •SPECIES: DOUG. FIR •GRADE: N/A •SLOPE: 18°SCALE: 1/8" = 1'-0" IRONRIDGE FLASHVUEROOF MOUNT •SET @: 6-FT O.C. •ROOF TYPE: COMP. SHINGLES T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) IRONRIDGE: XR-10 RAIL(S) •RAIL SPAN : SEE CHARTFOR DETAILS IRONRIDGE FLASH VUE ROOF MOUNT (FOR COMP. SHINGLE APPLICATION) 3 (2.77) (3.51) 2 1 (TYP.) SOLAR MODULE IRONRIDGE: XR SERIES RAIL IRONRIDGE: 3 8" HEX BOLT ROOF FRAMING ROOF SHEATHING 7 16" X .75" NUT, FLANGE (1) 5 16" LAG BOLTS2-1/2-IN. EMBEDMENT MIN. PRE-DRILLED 3 16" HOLEPLACE SEALANT AROUND LAG BOLT & UNDER STAND-OFF BASE IRONRIDGE: UFO CLAMP (INTEGRATED GROUNDING) FLASHING (TYP.) ASPHALT SHINGLE PARTS LIST ITEM QTY.DESCRIPTION 1 1 FM FLASHING; MILL OR BLACK 2 1 3 1 GRIP CAP; MILL OR BLACK LAG & BOND WASHER; 5 16 x 41 4, 7 16 HEX HEAD ENPHASE: IQ8MC-72-M-US MICRO-INVERTER ENPHASE: IQBATTERY-5P-1P-NA 20A|240V (ESS #1) ENPHASE: COMBINER BOX 80A|240V AC DISCONNECT 60A|240V MAIN SERVICE PANEL | UTILITY 2'-4" 1'-6" 1'-6" 2'-4" 1'-6" 1'-6" 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE www. Loyd W Martin .com Solar Structures Engineering #2026-0037 Structural Only January 26, 2026 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 2187 NOTE: Engineer of Record assumes that all structural components of the existing building were permitted and met the requirements of the Building Code at the time of construction. Solar Contractor shall field verify that the roof framing is in its existing permitted condition and capable of supporting required live loads. Framing specified on solar plans shall be assumed to be minimum size and spacing, actual framing may be different. NOTE: The solar contractor shall inspect the roof framing supporting the solar array and confirm that it meets the current wood “type v” standards. If any rafters or supports are damaged, they shall be replaced or repaired. If any rafters are not securely connected to ridge beams, hip beams, cross ties, or supports, those members shall be connected at this time. PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: 1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10 S EW N S.03 ESS STRUCTURAL ESS STRUCTURAL SCALE: N.T.S. *TYPICAL DRAWING FOR ESS WALL MOUNTING 8.1-IN. ENPHASE: IQBATTERY-5P-1P-NANOTES •BATTERY WEIGHT:174 LBS. •MOUNTING TYPE:WALL MOUNT •INSTALL LOCATION:EXTERIOR 22-IN. 39 - I N . DC DISCONNECT SWITCH ALEX J. CLUCK Alex J. Cluckx T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE www. Loyd W Martin .com Solar Structures Engineering #2026-0037 Structural Only January 26, 2026 Exp. 3-31-19 No. C58724 NITRAMW.DYO REGISTEREDPROFESSIONALENGINEER C V L FOETATS ALIFORNIAICIL 2187 38 . 5 8 " EXISTING 2x4 STUDS @ 16" O.C. 16" NOTE: PROPOSED BATTERY STORAGE WILL BE MOUNTED TO EXISTING 2x4 STUDS @ 16" O.C. EQUIPMENT MOUNTING BRACKET 5/16" LAG SCREWS w/ 3" MIN. EMBEDMENT NOTE: Only 1 Battery Unit shall be installed per frame and line of studs. If multiple batteries shall be installed, they must be installed on separate studs with separate frames. Enphase 5P (174 lbs / unit) 21 5/8" 38 1 / 4 " NOTE:Bottom of battery shall be 12 inchesabove exterior grade minimum PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: 1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10ALEX J. CLUCK Alex J. Cluckx S EW EQUIPMENT ELEVATION N EQUIPMENT TAG # 1 EQUIPMENT LIST SCALE: 1/4" = 1'-0" A.01 ELEVATION 2 BACK OF HOME EQUIPMENT TO BE INSTALLED W/ CLEARANCES PER MANUFACTURER'S SPECS *DWG DEPICTS TYP. EQUIPMENT SETUP, FINALSETUP DETERMINED BY INSTALLATION TECH. FRONT OF HOME T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) MSP | UTILITY AC DISCONNECT 3ENPHASE: COMBINER BOX 4ENPHASE: IQ-5P BATTERY 2 1 (E) WATER HEATER CLOSET (E) WINDOW 3' - 0 " 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE 4 3 •ALL GROUNDING PER CEC 250 & 690 •THE DE-RATE FACTOR FOR CONDUCTORS IN RACEWAY THRU AN ATTIC PER [NEC 310.15(2)(B)], THE LOCATION OF THE DC RACEWAYS BENEATH THE ROOF, TO NOT BE CLOSER THAN, & RUN PERPENDICULAR TO, 10" OF THE ROOF DECK AS REQUIRED BY, PROVIDE A VISUAL BREAK UTILITY DISCONNECT AT THE SERVICE METER LOCATION •WORKING CLEARANCES AROUND THE EXISTING ELECTRICAL EQUIPMENT, AS WELL AS, THE NEW ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE •SPACING MUST BE MAINTAINED BETWEEN ANY PLUMBING SEWER VENTS EXTENDING THROUGH THE ROOF & THE UNDERSIDE OF THE PHOTOVOLTAIC PANELS MAINTAIN 12” MINIMUM HORIZONTALLY THE PHOTOVOLTAIC INVERTER WILL BE LISTED AS [UL 1741] COMPLIANT •ALL METALLIC RACEWAYS & EQUIPMENT SHALL BE BONDED & ELECTRICALLY CONTINUOUS. •PHOTOVOLTAIC ARRAYS SHALL BE PROVIDED W/ DC GROUND-FAULT PROTECTION. •DC GROUNDING ELECTRODE CONDUCTOR SHALL BE SIZED ACCORDINGLY •AC GROUNDING ELECTRODE CONDUCTOR SHALL BE SIZED ACCORDINGLY •GROUND BUSHINGS ARE REQUIRED AROUND PRE-PUNCHED CONCENTRIC KNOCKOUTS ON THE DC SIDE OF THE SYSTEM •THE GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL (OR INVERTER) IF SMALLER THAN #6 COPPER WIRE •THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES WITH IRREVERSIBLE COMPRESSION TYPE CONNECTOR #10-24 S.S. LOCK NUT #10-24 S.S. EXTERNAL TOOTH LOCK 'STAR' WASHER #10-24 x 3 4" S.S.HCS BOLT S.S. SET SCREWINCLUDED LAY IN LUG TERMINAL AL/CU DUAL RATED (TIN PLATED CU) LOCKNUT 'EMT' CONDUIT 'EMT' CONNECTOR CONTINUOUS GROUND STRIP INSULATION #6 AWG BARE CU WIRE SEALING LOCKNUT AS NEEDED GROUND BUSHING W/ LAY-IN LUG #6 AWG BARE CU WIRE #6 AWG BARE CU WIRE MICRO-INVERTER *SELF GROUNDED BONDING BASE 'SPLICE BAR' JUNCTION BOX MODULESTANDARD RAIL *SELF GROUNDED BONDING & GROUNDING TO BE FIELD VERIFIED! GROUNDING GENERAL NOTES BONDING BASE'SPLICE BAR' GROUNDING DETAILS PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: E.01 ELECTRICAL1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10 S EW ELECTRICAL LAYOUT N ALEX J. CLUCK Alex J. Cluckx SCALE: 1/8" = 1'-0" NEMA 3R JUNCTION BOX T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) CONDUCTOR RACEWAY DETAILS •TYPE: FMC •SIZE: 3/4-IN. •TO BE INSTALLED IN ATTIC •TO BE 7/8-IN. OFF OF SURFACE (EXACT LOCATION TO VARY) 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE ENPHASE: IQ8MC-72-M-US MICRO-INVERTER ENPHASE: IQBATTERY-5P-1P-NA 20A|240V (ESS #1) ENPHASE: COMBINER BOX 80A|240V AC DISCONNECT 60A|240V MAIN SERVICE PANEL | UTILITY PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: E.02 ONE-LINE DIAGRAM1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10ALEX J. CLUCK Alex J. Cluckx (N) NON-FUSED AC DISCONNECT 5 PV-C 4 A PV-B (N) COMBINER BOX •FIELD VERIFY WIRELESS COMMS. KIT & CELL MODEM UTILITY GROUNDING ROD(S) SET @ 6' APART MIN. 8 PV-C UTILITY MAIN SERVICE PANEL - UTILITY METER •EXISTING 200A MAIN | 225A BUSBAR •INSTALL OCPD C/B'S OPPOSITE END OFMAIN OCPD IN MSP:••35A-2P (PV + ESS) •BATTERIES FOR CYCLING PURPOSE ONLY •ENERGY STORAGE SYSTEM TO NEVEREXCEED 120% OF BUSBAR RATING DUETO SETTINGS WITHIN SYSTEMSSOFTWARE IN ACCORDANCE WITHCEC 705.12(3)(2) •LOADS RELOCATED MORE THEN 6-FT.REQUIRE AFCI|GFCI PROTECTEDBREAKERS T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR PV-E 6 (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) (N) ESS 1AC DISCONNECT 60A RATED | 240V; NON-FUSED; BLADE-TYPE5 1COMBINER BOX ENPHASE: X-IQ-AM1-240-XX; 80A | 240V; IQ MONITORING INTEGRATED4 1COMBINER BOX BREAKERSA 1ENERGY STORAGE ENPHASE: IQBATTERY-5P-1P-NA W/ (6) IQ8X-BATT-US MICRO-INVERTERS INTEGRATED; 16A|240V 6 EQUIPMENT DESCRIPTION QTY.TAG # ELECTRICAL EQUIPMENT LEGEND 6MODULESSILFAB: SIL-440 QD1 6INVERTER(S)ENPHASE: IQ8MC-72-M-US2 1JUNCTION BOX NEMA 3R RATED (WATER-TIGHT);SINGLE ENCLOSURE3 1MAIN SERVICE PANEL | UTILITY8 UPGRADING EXISTING MAIN TO NEW 200A MAIN | 225A BUSBAR 120/240V RATED 7 BATTERY(IES) TO BE CONNECTED IN 'PARALLEL' TO ONE ANOTHER ARRAY #1: (6) MODULES W/ (6) MICRO-INVS. PV-A (N) NEMA 3R JUNCTION BOX 120A-2P | 240V (ESS) 110A-2P | 240V (MONITORING) 15A-2P | 240V (PV SOLAR)'PV-A' DESIGN #12 #6 FREE-AIR SECURED BARE CU - EGC CONT. (G) MODULES > J-BOX(S) 2 1 ENPHASE Q-CABLE (L1, L2) 'PV-D' DESIGN #10 #8 THWN-2 (L1, L2, N)40A 40A 3/4-IN.EMT THWN-2 AWG - EGC CONT. (G) 16A2 1 ESS > COMB. BOX 'PV-B' DESIGN #10 #8 THWN-2 (L1, L2)40A 0.58 (ROOFTOP)23.2A 3/4-IN. THWN-2 AWG - EGC CONT. (G) J-BOX(S) > COMB. BOX 22.18A2 1 FOR AMPACITY CALCULATIONS ONLY AMPACITY TABLE 310.15(B)(16) RATING @ 90° (CONDUCTOR RATING); CORRECTION FACTOR TABLE 690.31(A) AMBIENT TEMP @ 61-70°; TEMP RATING @ 90° (ROOFTOP); CORRECTION FACTOR TABLE 690.31(A) AMBIENT TEMP @ 41-45°; TEMP RATING @ 90° (GROUND); ADJUSTMENT FACTOR TABLE 310.15(B)(16) RATING @ 90° (NUMBER OF CONDUCTORS) TAG I.D. LOCATION # OF CCC SIZE TYPE RATING CORRECTION FACTOR ADJUSTMENT FACTOR CONTINUOUS SYSTEMOUTPUT SIZE TYPERATED CONDUCTOROUTPUT CONDUCTOR SCHEDULE AMPACITY CALCULATIONS CONDUIT SCHEDULESYSTEM INFORMATION 1.00 (3 MAX.)FMC 'PV-E' DESIGN #18 AWG (1, 2, 3, 4, DRAIN)3/4-IN.EMT CONTROL WIRE FOR SYSTEM PCS 5ESS > COMB. BOX 'PV-C' DESIGN #10 #8 THWN-2 (L1, L2, N)40A 0.87 (GROUND)34.8A 3/4-IN.EMT THWN-2 AWG - EGC CONT. (G) 1.00 (3 MAX.)13.43A3 1 COMB. BOX > AC DISCO. > MSP 1PV OCPD C/B 35A-2P | 240V7 PV-D 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE SILFAB: SIL-440 QD MOD. IMP: (13.17A) * (1 MOD.) = 13.17A MOD. ISC: (14.22A) * (1 MOD.) = 14.22A (22°C - (25.6°C + 25°C) * (-0.29%/°C) = 6.54% VOLTAGE DROP (33.4VMP) * (6.54%) = 2.19V PER - (33.4VMP) = 31.22V VMP (31.22V) * (ARRAY OF 6) = 187.35V @ AVR. HIGH 25.6°C PV MAX. CONTINUOUS OUTPUT: # OF MICRO-INVS. * 240VAC BATTERY MAX. CONTINUOUS OUTPUT: (1) IQ BATTERY 5P = 3,840VA •(6) MICRO-INVS. * 240VAC = 1,440VAC •(1) IQ BATTERY 5P * 3,840VA = 3,840VA PV TO BATTERY RATIO: 1,440VAC / 3,840VA = 0.38 OR 38% COMPLIANCE; NO AUTONOMY! PV TO BATTERY RATIO ≤ 150% BATTERY TO PV RATIO: 3,840VA / 1,440VAC = 2.67 OR 267% COMPLIANCE; NO AUTONOMY! BATTERY TO PV RATIO ≥ 67% SYSTEM AC WIRING RUN: BRANCH #1 CONTINUOUS OUTPUT CURRENT (IMP): (415.5 PTC RATING) * (6 MOD.) * (97.0% CEC INV. EFF.) = 2,418.21WAC / 240VAC = 10.08A MAX OUTPUT CURRENT (PMAX): 1.33A(6) * 125% = 9.98A ---> 20A COMB. BOX C/B ESS IMP: 16A(1) ----> 16A >PV-D DESIGN ESS PMAX: 20A(1) ----> 20A C/B >COMBINER OCPD SYSTEM AC WIRING TOTALSYSTEM WAC: WAC MODULE ISC: 14.22A * 156% = 22.18A >PV-B DESIGN SYSTEM IMP: 10.08A >PV-C DESIGN SYSTEM PMAX: 9.98A ----> 15A C/B >MSP OCPD (225A BUSBAR) * (120%) = 270A MAX. 200A MAIN BREAKER + 35A SYSTEM OCPD = 235A 235A ≤ 270A PER [CEC 705.12 (B)(2)(3)(b)] SYSTEM TO NEVER EXCEED 120% OF BUSBAR RATING DUE TOPCS SETTING WITHIN SYSTEMS SOFTWARE PER CEC 705.12(3)(2) PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:HOMEOWNER:CONTRACTOR: E.03 ONE-LINE CALCS.1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10 •ALL CONDUCTOR(S) TO BE RAN IN RACEWAY •PHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM DC DISCONNECT/INVERTER AS PER NEC 250.166(B): "THE GROUNDING ELECTRODE CONDUCTOR SHALL NOT BE SMALLER THEN THE LARGEST CONDUCTOR SUPPLIED BY THE SYSTEM & NOT SMALLER THEN #8 AWG." •SYSTEM GROUNDING ELECTRODE CONDUCTOR FOR PHOTOVOLTAIC SYSTEM SIZED TO MEET THE REQUIREMENTS OF 250.66 (AC) & 250.66 (DC), 690.74(C) NOT SMALLER THEN #8 AWG •EQUIPMENT OPERATING 150V OR GREATER SHALL ONLY BE SERVICED ORREPLACED BY QUALIFIED PERSONNEL. FIELD PROTECTION MAY BE IN THE FORM OF CONDUIT, CLOSED CABINET OR AN ENCLOSURE WHICH REQUIRES USE OF TOOLS TO OPEN •SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE W/ REQUIREMENTS OF ARTICLE 690 OF THE 2022 CEC •MIN. HEIGHT OF CONDUIT ABOVE ROOF TO MATCH TEMP. DE-RATING FACTOR •PHOTOVOLTAIC DC CONDUCTORS ENTERING THE BUILDING SHALL BE INSTALLED IN METAL CONDUIT & THE CONDUIT SHALL BE LABELED "CAUTION DC CONDUIT" EVERY 10-FT. •SMOKE ALARMS & CARBON MONOXIDE DETECTORS WILL MEET THE NECESSARY REQUIREMENTS PER CRC R314, R315 •UTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE PHOTOVOLTAIC SOLAR SYSTEM •GROUNDING TO BE INSTALLED PER MODULE MANUFACTURE INSTRUCTIONS. GROUND METHOD: GROUND LUGS W/ BARE COPPER WIRE ELECTRICAL GENERAL NOTES SCOPE OF WORK: ALEX J. CLUCK Alex J. Cluckx ENPHASE: IQ8MC-72-M-US MICRO-INVS. NOM. AC VOLTAGE: 240V MAX. INPUT DC VOLTAGE: 60VNOM. AC OUTPUT CURRENT: 1.33A MAX. DC SHORT CIRCUIT CURRENT: 15A MAX. MODS. PER 20A BRANCH: 11MOD. PAIRING: 260W - 460W ENPHASE: IQBATTERY-5P-1P-NA BATTERY OUTPUT (AC) RATED CONT. OUTPUT: 3.84 kVaNOMINAL VOLTAGE: 240VRATED OUTPUT CURRENT: 16A MAX. UNIT PER 20A C/B: 1 BATTERY TOTAL CAPACITY:5.0 kWh USABLE CAPACITY:5.0 kWhROUND TRIP EFFICIENCY: 96%NOMINAL DC VOLTAGE: 76.8VMAXIMUM DC VOLTAGE: 86.4VCHEMISTRY:LFP 5P BATTERY HAS (6) IQ8D-BATMICRO-INVS. INTEGRATED (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE RECOMMENDED SPECIFICATION: •RED LETTERING W/ WHITE BACKGROUND •LETTER HEIGHT OF 3 8" •LETTERS TO BE CAPITALIZED •ARIAL OR SIMILAR FONT •WEATHER RESISTANT •REFLECTIVE ALL LABELS TO BE PLACED ON THE INTERIOR & EXTERIOR OF EVERY; •DC CONDUIT, RACEWAYS, ENCLOSURES & CABLE ASSEMBLIES; ••EVERY 10' ••W/IN 1' OF EVERY TURN & BEND ••W/IN 1' OF ROOF & CEILING ASSEMBLIES; & ••EVERY WALL & BARRIER DIRECTORY PLACARD MUST BE INSTALLED AT THE MAIN SERVICE PANEL SHOWING LOCATION(S) FOR; •MAIN SERVICE DISCONNECTS •PHOTOVOLTAIC SOLAR INSTALLED •EQUIPMENT INSTALLED SIGNAGE GENERAL NOTES LEGEND DRAWING IS TO ILLUSTRATE TYPICAL PLACEMENT OF PLACEMENT TO BE FIELD VERIFIED FOR ACCURACY! PREPARED BY:DATE: PROJECT NUMBER: SHEET NAME: SHEET NUMBER: PROPOSED EQUIPMENT:SCOPE OF WORK:HOMEOWNER:CONTRACTOR: 1/21/2026 TG-388 ABRAHAM BRITO 1407 N. KING ST. (ADU) SANTA ANA | CA | 92706 APN #: 004-030-10 WARNING SIGNAGE ALEX J. CLUCK Alex J. Cluckx S.04 T&G ROOFING AND SOLAR COMPANY CSLB #583458 (B|C-39|C-10|HIC) 153 N. 10TH ST. UPLAND, CA 91786 (909) 931-3204Roofing & Solar Company ROOFING · GUTTERS GENERATORS · SOLAR SOLAR MODULES W/ MICRO-INVS. CAUTION UTILITY METER MAIN SERVICE PANEL ADDITIONAL POWER SOURCE BEING SUPPLIED TO THIS BUILDING WITH DISCONNECTS AS SHOWN: 1407 N. KING ST. (ADU) - SANTA ANA - 92706 SOLAR (PV) ARRAY J-BOX AC DISCONNECT COMBINER BOX ESS 7 7 2 4 5 6 98 1 5 6 8 9 2 3 4 3 1. ESS BREAKER - DO NOT RELOCATE PLACE NEAR PV OCPD IN MSP 1.1 SOLAR PV BREAKER - DO NOT RELOCATE PLACE NEAR PV OCPD IN MSP 2. AC DISCONNECT (RATING) PLACE ON DISCONNECT PER CEC 690.52 3. ESS & PV DISCONNECT (RATING) PLACE ON ATS PER CEC 690.52 4. DIRECTORY SITE MAP PLACE ON MSP-UTILITY PER CEC 705.10 5. GROUND FAULT PLACE ON MSP-UTILITY PER NEC 690.35(F) 6. PV SYSTEM CONNECT PLACE ON MSP-UTILITY 7. JUNCTION BOX - AC PLACE ON ALL JUNCTION BOXES 8. DO NOT EXCEED BUSBAR PLACE ON MSP-UTILITY PER CEC 690.13(B) 9. METER ADDITION - PV & ESS PLACE ON MSP-UTILITY 10. CAUTION SOLAR CIRCUIT PLACE EVERY 10-FT, BEFORE & AFTER EVERY BEND PER CEC 690.31(G)(3) 11. AC DISCONNECT PLACE ON AC DISCONNECT 12. POWER OUTPUT SOURCE CONNECTION PLACE ON MSP-UTILITY PER CEC 705.12(B)(2)(3)(B) 13. DO NOT TOUCH TERMINALS PLACE ON MSP-UTILITY PER CEC.13(B) 15. ESS LOCATED ON-SITE PLACE ON MSP-UTILITY 16. SYSTEM EQUIPPED W/ RAPID SHUTDOWN PLACE NO LESS THAN 3-FT. OF DISCONNECT PER CEC 690.56 - SEC. 690.56(3) 17. TRI-POWER SOURCES PLACE ON MSP-UTILITY PER NEC 705.12(B)(3) MSP-UTILITYAC DISCONNECT 1 (6) SILFAB: SIL-440 QD (MODS.) (6) ENPHASE: IQ8MC-72-M-US (MICRO-INVS.) (1) ENPHASE: IQBATTERY-5P-1P-NA (ESS) BATTERY #1COMBINER BOX 2.64kW (DC) | 2.41kW (CEC-AC) SOLAR W/ 5kWh BATTERIES INSTALL A NEW ENERGY STORAGE SYSTEM ON NEW ADU . WORK TO BE CONDUCTED UNDER AN ACTIVE CSLB LICENSE SHALL ADHERE TO APPLICABLE CODES. *SEE CODE(S) REFERENCED THROUGHOUT THIS PLAN SET FOR COMPLIANCE Roofing and Solar Company Inc. ROOFING • SOLAR • RAIN GUTTERS Workers Compensation & General Liability Insured License No. 583458 - 039, C10, B To whom it may concern,06/03/2024 This letter is to inform you to allow "Lynnae S Claeys" to pull building permits and business licenses on behalf of "Michael C Prescher", CEO of T&G Roofing and Solar Company Inc. Sincerely, Michael C Prescher - CEO T&G Roofing and Solar Company Inc. SEE ATTACHED NOTARIAL CERTIFICATE 153 North Tenth Avenue • Upland, OA 91786 • www.tgrooflng.com 909 931 3204 • 800 6-ROOFING • Fax 909 931 3824 CITY OF SANTA ANA Planning and Building Agency CALIFORNIA ACKNOWLEDGMENT Approved FOR PERMIT ISSUANCE'S Master ID: ViLtPODE § 1189 A notarypublic or other officer completing this certificate verifies only the identityof the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California 1 County of 4-oth 12ernctrd i (Io J} Or1;��t 1 UJZL before me, I Y(0 I C. Date A , , f i — Olere Insert,Name and Title of thJ Officer personally appeared Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. ADRIANA BATRES *my Notary Pubik - Callfornia _San Bernardino County Commission # 2473061 Comm. Expires Nov 21, 2027 �v Place Notary Sea/ and/or Stamp Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official pal. Signature Signature of Notary Public Vr 1 IVIVf1L Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Title or Type of D' i mei Document Date Y/ Signer(s) Other Than Named Above: Capacity(ies) CIy* e siggeryw! Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer is Representing: ©2019 National Notary Association %"? NulberfofPages: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator rl Othpr- Signer is Representing: Icm OF PLWi^G IM( AGE\CV Pfanning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11" X 17" size. If answering NO to anv of the questions, plan check shall be required. Project Address: I4sg N. my sr. ama ca Wo Contractor Company Name: I Tp kOUr Contractor License Number: 563 LfS? YES NO 1- ^ □ 2. lEi □ 3. ^ □ 4. ]^ □ 5. 5^ □ 6. ^ G 7. 8. 0 G 9. G 10. G Are the following applicable to the proposed project? Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 4 pounds per square feet or less? Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weight system? Will the anchors be Installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? Will the minimum 5/16" lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer's PV support information.) I certify under penalty of perjury under the laws of the State of Callfoj^ Print Name: Signature: Phone Number: Date: _ Email Address: lat the above is true: Rev: 7/15/2021 To whom it may concern, 2/5/2026 I Abraham Brito have signed with T&G roofing and Solar Company to install “solar panels” and a battery at 1407 N King St. Should you have any questions please feel free to reach me at 714-483-6968 Abraham Brito - Homeowner Abraham Brito (Feb 5, 2026 13:59:07 PST) To whom it may concern Final Audit Report 2026-02-05 Created:2026-02-05 By:Lynnae Claeys (lynnae@tgroofing.com) Status:Signed Transaction ID:CBJCHBCAABAAERpzqR2krXxbFul7h9N7dmqJYv7_xWEw "To whom it may concern" History Document created by Lynnae Claeys (lynnae@tgroofing.com) 2026-02-05 - 9:43:14 PM GMT- IP address: 47.180.253.142 Document emailed to Abraham Brito (abrahambrito@yahoo.com) for signature 2026-02-05 - 9:43:17 PM GMT Email viewed by Abraham Brito (abrahambrito@yahoo.com) 2026-02-05 - 9:46:21 PM GMT- IP address: 146.75.146.1 Document e-signed by Abraham Brito (abrahambrito@yahoo.com) Signature Date: 2026-02-05 - 9:59:07 PM GMT - Time Source: server- IP address: 172.58.112.52 Agreement completed. 2026-02-05 - 9:59:07 PM GMT