Loading...
HomeMy WebLinkAbout1820_1st_P0115985_2024-195033_Grading - PlanHYD FINISHED FLOOR 133.72 P I V FDC OCASA CHARTER SCHOOL GRADING & UTILITY PLANS FOR DP NO. 2025-04R 1820 E. FIRST STREET APN: 402-211-08 CITY OF SANTA ANA, CA PROJECT DIRECTORY PROJECT OWNER: RED HOOK CAPITAL PARTNERS 2120 E. GRAND AVE., SUITE 135 EL SEGUNDO, CA 90245 SURVEY: BOUNDARY SURVEYING & MAPPING INC. 2102 BUSINESS CENTER DRIVE IRVINE, CA 92612 PHONE: (503) 990-4613 RESPONSIBLE CIVIL ENGINEER: RANDY CHAPMAN, P.E. CCE DESIGN ASSOCIATES, INC. 771 E. DAILY DRIVE, SUITE 120 CAMARILLO, CA 93010 PHONE: (805) 738-5434 SOILS ENGINEER: GEOTECHNICAL PROFESSIONALS INC. 5736 CORPORATE AVENUE CYPRESS, CA 90630 CONTACT: JAMES E. HARRIS PHONE: (714) 220-2211 LANDSCAPE ARCHITECT: MJS LANDSCAPE ARCHITECT 507 30TH STREET NEWPORT BEACH, CA 92663 CONTACT: MARK SCHATTINGER PHONE: (949) 675-9964 ARCHITECT: RAFAEL FRANCO & ASSOCIATES, INC. 12345 VENTURA BLVD., SUITE H STUDIO CITY, CA 91604 CONTACT: ARTHUR FERNANDEZ PHONE: (818) 754-2030 MEP ENGINEER: TX ENGINEERING 112 E AMERIGE AVENUE #131 FULLERTON, CA 92832 CONTACT: THOMAS XU PHONE: (213) 295-5532EARTHWORK CALCULATIONS EARTHWORK QUANTITIES: CUT:700 CUBIC YARDS FILL:475 CUBIC YARDS NET:225 CUBIC YARDS (CUT) NOTE: EARTHWORK QUANTITIES PRESENTED HEREON ARE FOR PERMITTING PURPOSES ONLY, CONTRACTOR IS RESPONSIBLE FOR DETERMINING THEIR OWN EARTHWORK QUANTITIES FOR BIDDING PURPOSES. PROJECT IMPERVIOUS CALCULATIONS PROJECT AREA = 100,201 SF (2.30 AC) EXISTING LANDSCAPE AREA TO REMAIN = 12,082 SF (0.28 AC) PROPOSED LANDSCAPE AREA = 2,581 SF (0.06 AC) TOTAL LANDSCAPE AREA = 14,663 SF (0.34 AC) PRE-CONSTRUCTION IMPERVIOUS AREA = 82,893 SF (1.90 AC) PRE-CONSTRUCTION PERVIOUS AREA = 17,308 SF (0.40 AC) POST-CONSTRUCTION IMPERVIOUS AREA = 85,133 SF (1.95 AC) POST-CONSTRUCTION PERVIOUS AREA = 15,068 SF (0.35 AC) PROJECT SITE E 1ST ST I-5 55 E MAIN ST ZO O L N CA B R I L L O P A R K D R DEMOLITION/CONSTRUCTION CALCULATIONS PERVIOUS CALCULATIONS LANDSCAPE AREA REMOVED = 1,374 SF - REPLACED BY PERVIOUS PLAYGROUND AREA LANDSCAPE AREA REMOVED = 124 SF - REPLACED BY PERVIOUS CONCRETE ASPHALT AREA REMOVED = 1,573 SF - REPLACED BY LANDSCAPE ASPHALT AREA REMOVED = 1,890 SF - REPLACED BY PERVIOUS CONCRETE ASPHALT AREA REMOVED = 1,100 SF - REPLACED BY PERVIOUS PLAYGROUND AREA CONCRETE AREA REMOVED = 124 SF - REPLACED BY PERVIOUS PLAYGROUND AREA CONCRETE AREA REMOVED = 1,008 SF - REPLACED BY LANDSCAPE IMPERVIOUS CALCULATIONS LANDSCAPE AREA REMOVED = 2,077 SF - REPLACED BY CONCRETE/HARDSCAPE LANDSCAPE AREA REMOVED = 113 SF - REPLACED BY ASPHALT ASPHALT AREA REMOVED = 1,937 SF - REPLACED BY CONCRETE/HARDSCAPE CONCRETE AREA REMOVED = 152 SF - REPLACED BY ASPHALT CONCRETE AREA REMOVED = 703 SF - REPLACED BY HARDSCAPE/NEW CONCRETE WQMP CALCULATION: PROJECT SITE CREATES AND/OR REPLACES 4,982 SF OF IMPERVIOUS AREA. Underground Service Alert of Southern California Know what's below. before you dig.Call R DESCRIPTION SHEET INDEX SHEET NAMESHEET NUMBER TITLE SHEET -1 REMOVAL/DEMOLITION PLAN RA014 6 GRADING PLAN GA01 9 EROSION CONTROL PLAN EA01 10 EROSION CONTROL DETAILS ED01 PREPARED UNDER THE SUPERVISION OF: APPROVALS: RANDY A CHAPMAN R.C.E. NO.: C69614 DATE FOR PUBLIC SEWER AND WATER FACILITIES ONLY APPROVED BY: ARMANDO FERNANDEZ, P.E. DATE ACTING DEPUTY PUBLIC WORKS DIRECTOR/ WATER RESOURCES MANAGER PROJECT SITE BENCHMARK NO.: SA-335-06 ELEV.: 132.783' NAVD88 DESCRIBED BY OCS 2006 - FOUND 4" OCS ALUMINUM BENCHMARK DISK STAMPED "SA-335-06", SET IN THE NORTHWEST CORNER OF A 4.0 FT. BY 4.5 FT. CONCRETE CATCH BASIN. MONUMENT IS LOCATED IN THE NORTHEAST PORTION OF THE INTERSECTION OF ELK ST. AND FIRST ST. 45 FT. NORTH OF THE CENTERLINE OF FIRST STREET AND 50 FT. EAST OF THE CENTERLINE OF ELK ST., LEVEL WITH THE SIDEWALK BENCHMARK BEARINGS AND DISTANCES ARE BASED ON THE CENTERLINE OF EAST 1ST AVENUE, FROM CENTERLINE SHOWN HEREIN, BEING N89°41'35"E 739.02' SHOWN IN MM 1005 47-50 AS N89°41'35"W 719.10. BASIS OF BEARING THAT PORTION OF LAND LOCATED WITHIN THE CITY OF SANTA ANA, THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AS DESCRIBED BELOW: PARCEL 1: LOT 2 OF TRACT NO. 24, IN THE CITY OF SANTA ANA, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 9, PAGE 23 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA. EXCEPTING THEREFROM THAT PORTION LYING SOUTHWESTERLY OF THE NORTHEASTERLY LINE OF THE LAND DESCRIBED IN A DEED TO THE STATE OF CALIFORNIA, RECORDED DECEMBER 22, 1953 IN BOOK 2637, PAGE 506 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM THE NORTHERLY 289.0 FEET OF THE WESTERLY 230.0 FEET OF SAID LOT 2. PARCEL 2: THE PORTION OF LOT 4 OF TRACT NO. 24, AS SHOWN ON A MAP RECORDED IN BOOK 9, PAGE 23 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHEASTERLY CORNER OF SAID LOT 4; THENCE ALONG THE EASTERLY LINE THEREOF, SOUTH 0°05'25" WEST 127.56 FEET TO A CURVE, CONCAVE NORTHEASTERLY AND HAVING A RADIUS OF 1,920.00 FEET; THENCE NORTHWESTERLY ALONG SAID CURVE, FROM A TANGENT BEARING NORTH 48°55'49" WEST THROUGH AN ANGLE OF 1°37'24" AN ARC DISTANCE OF 54.40 FEET; THENCE NORTH 33°41'49" WEST 108.19 FEET TO A POINT IN THE NORTHERLY LINE OF SAID LOT 4, DISTANCE WESTERLY THEREON 100.73 FEET FROM SAID NORTHEASTERLY CORNER; THENCE EASTERLY ALONG SAID NORTHERLY LINE, 100.73 FEET TO THE POINT OF BEGINNING. EXCEPTING FROM SAID PARCEL 2, ALL MINERALS, OIL, GASES AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, THAT MAY BE WITHIN OR UNDER SAID PARCEL 2, WITHOUT, HOWEVER, THE RIGHT TO DRILL, DIG OR MINE THROUGH THE SURFACE OF SAID LAND THEREFOR, AS RESERVED IN THE DEED RECORDED IN BOOK 4015, PAGE 522 OF OFFICIAL RECORDS, ALSO EXPECTING FROM PARCELS 1 AND 2 THAT PORTION DESCRIBED AS PARCEL 72559-1 IN THE DEED TO THE STATE OF CALIFORNIA RECORDED JANUARY 31, 1994 AS INSTRUMENT NO. 94-0072254 OF OFFICIAL RECORDS OF SAID ORANGE COUNTY. LEGAL DESCRIPTION CONVERSION OF EXISTING FIVE-STORY OFFICE BUILDING INTO CHARTER SCHOOL. PROJECT SCOPE SOILS ENGINEER CERTIFICATION: I HAVE REVIEWED AND APPROVE THIS GRADING PLAN. IT COMPLIES WITH ALL OF THE REQUIREMENTS AND RECOMMENDATIONS PER GEOTECHNICAL REPORT DATED APRIL 25, 2025. SIGNATURE DATE FEMA ZONE X AREA DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN. FLOOD INFORMATION GENERAL NOTES DP012 PROJECT SITE APN: 402-211-08 APN: 402-211-09 SA N T A A N A F R E E W A Y APN: 402-201-05 (E) OFFICE BUILDING GRADING PERMIT NO. 50101547 TOPOGRAPHIC SURVEY MAP TP013 5 HORIZONTAL CONTROL PLAN HP01 7 GRADING DETAILS & SECTIONS GD01 8 UTILITY PLAN UT01 SR #2504895 PUBLIC WORKS AGENCY GRADING & UTILITY PLAN 1820 EAST 1ST STREET SANTA ANA, CA 92705 PARCEL APN: 402-211-08 JOB ADDRESS/PARCEL APN REFERENCES IMPROVEMENT PLANS NO. 11670, DATED 08-01-1980 MASONRY WALL PUMP BUILDING PLANS NO. 67780, DATED 07-09-1991 ALTA SURVEY PREPARED BY BOUNDARY SURVEY MAPPING INC., DATED 12-11-2024 1ST STREET PA R K D R . CA B R I L L O 11/6/2025 R. SOILS ENGINEER CERTIFICATION: DATE I HAVE REVIEWED AND APPROVE THIS GRADING PLAN. IT COMPLIES WITH ALL OF THE REQUIREMENTS AND RECOMMENDATIONS PER GEOTECHNICAL REPORT DATED APRIL 25, 2025. SIGNATURE R.C.E 91562 11-6-2025 11/25/25 Behrooz Sarlak 12/15/2025 GRADING GENERAL NOTES 1.ALL GRADING SHALL COMPLY WITH THE LATEST CBC CHAPTERS 18 AND 33, AND APPENDIX J AND THE SANTA ANA MUNICIPAL CODE. A CITY GRADING PERMIT IS REQUIRED FOR GRADING. 2.GRADING SHALL NOT BE STARTED WITHOUT FIRST NOTIFYING THE CITY GRADING INSPECTOR. A PRE-GRADING MEETING ON THE SITE IS REQUIRED BEFORE STARTING OF GRADING WITH THE FOLLOWING PEOPLE PRESENT: GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, GEOTECHNICAL ENGINEER, GRADING INSPECTOR AND WHEN REQUIRED, THE ARCHAEOLOGIST AND PALEONTOLOGIST. THE REQUIRED INSPECTIONS FOR GRADING WILL BE EXPLAINED AT THIS MEETING. 3.AN APPROVED COPY OF THE GRADING PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 4.THE DESIGN CIVIL ENGINEER SHALL BE AVAILABLE DURING THE GRADING TO VERIFY COMPLIANCE WITH THE PLANS, SPECIFICATIONS, CODE AND ANY SPECIAL CONDITIONS OF THE PERMIT WITHIN HIS PURVIEW. 5.THE GEOTECHNICAL ENGINEER SHALL PERFORM PERIODIC INSPECTIONS AND SUBMIT A COMPLETE REPORT AND MAP UPON COMPLETION OF THE ROUGH GRADING. THE COMPACTION REPORT AND APPROVAL FROM THE GEOTECHNICAL ENGINEER SHALL INDICATE THE TYPE OF FIELD TESTING PERFORMED. EACH TEST SHALL BE IDENTIFIED WITH THE METHOD OF OBTAINING THE IN-PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING, AND SHALL BE SO NOTED FOR EACH TEST. SUFFICIENT MAXIMUM DENSITY DETERMINATIONS SHALL BE PERFORMED TO VERIFY THE ACCURACY OF THE MAXIMUM DENSITY CURVES BY THE FIELD TECHNICIAN. 6.CUT AND FILL SLOPES SHALL BE NO STEEPER THAN 2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1) EXCEPT WHERE SPECIFICALLY APPROVED OTHERWISE. 7.FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 90% RELATIVE DENSITY. AGGREGATE BASE FOR ASPHALTIC AREAS SHALL BE COMPACTED TO MINIMUM OF 95% RELATIVE DENSITY. MAXIMUM DENSITY SHALL BE DETERMINED BY UNIFORM BUILDING CODE STANDARD NO. 70-1 OR APPROVED EQUIVALENT, AND FIELD DENSITY BY UNIFORM CODE STANDARD NO. 70-2 OR APPROVED EQUIVALENT. 8.THE CONTRACTOR SHALL NOT CREATE ANY TRENCH OR EXCAVATION 5-FEET OR MORE WITHOUT THE NECESSARY PERMIT FROM THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY. 9.ALL CUT SLOPES SHALL BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE GEOTECHNICAL ENGINEER TO DETERMINE IF ANY SLOPE STABILITY PROBLEM EXISTS. SHOULD EXCAVATION DISCLOSE ANY GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE GEOTECHNICAL ENGINEER SHALL SUBMIT A RECOMMENDED TREATMENT TO THE CITY ENGINEER FOR APPROVAL. 10.THE PERMITTEE IS RESPONSIBLE FOR DUST CONTROL MEASURES. WATER ACTIVE SITES AT LEAST TWICE DAILY. 11.THE LOCATING AND PROTECTION OF ALL EXISTING UTILITIES IS THE RESPONSIBILITY OF THE PERMITTEE. 12.GRADING OPERATIONS, INCLUDING MAINTENANCE OF EQUIPMENT, WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE OF HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 8:00 P.M. AND 7:00 A.M. ON WEEKDAYS, INCLUDING SATURDAY, OR ANY TIME ON SUNDAY OR A FEDERAL HOLIDAY. (CITY OF SANTA ANA MUNICIPAL CODE SECTION 18-314) 13.THE PERMITTEE SHALL GIVE REASONABLE NOTICE TO THE OWNER OF ADJOINING LANDS AND BUILDINGS PRIOR TO BEGINNING EXCAVATIONS, WHICH MAY AFFECT THE LATERAL AND SUBJACENT SUPPORT OF THE ADJOINING PROPERTY. THE NOTICE SHALL STATE THE INTENDED DEPTH OF EXCAVATION AND WHEN EXCAVATION COMMENCES. THE ADJOINING OWNER SHALL BE ALLOWED AT LEAST 30 DAYS AND REASONABLE ACCESS ON THE PERMITTED PROPERTY TO PROTECT HIS STRUCTURE, IF HE SO DESIRES, UNLESS OTHERWISE PROTECTED BY LAW. 14.ALL EXISTING DRAINAGE COURSES THROUGH THE SITE SHALL REMAIN OPEN TO HANDLE THE STORM WATER; HOWEVER, IN ANY CASE, THE PERMITTEE SHALL BE HELD LIABLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 15.APPROVED EROSION PROTECTION DEVICES SHALL BE PROVIDED AND MAINTAINED DURING THE RAINY SEASON AND SHALL BE IN PLACE AT THE END OF EACH DAY'S WORK. PROPER EROSION CONTROL MEASURES MUST BE SHOWN ON THE PLANS. 16.CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITES. DISCHARGES OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR 117 AND 302. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLES/EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING; AND SUPERCHLORINATED POTABLE WATER LINE FLUSHINGS. DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A SPECIFIED AND CONTROLLED TEMPORARY AREA ON-SITE, PHYSICALLY SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS. 17.DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF NON-CONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD. 18.ALL DIRT, SAND, MUD, OR DEBRIS DEPOSITED OR SPILLED UPON PUBLIC STREETS DURING ANY GRADING, HAULING, OR EXPORT OPERATIONS SHALL BE IMMEDIATELY CLEANED UP BY THE DEVELOPER, HIS CONTRACTOR, SUBCONTRACTORS, OR AGENTS TO THE SATISFACTION OF THE CITY ENGINEER. FAILURE TO DO SO WILL BE CAUSE FOR STOPPING ALL SUCH GRADING, HAULING, OR EXPORT WORK BY THE CITY UNTIL SUCH TIME AS THE STREETS ARE CLEANED. 19.ALL TRUCKS HAULING DIRT, SAND, OIL, OR OTHER LOOSE MATERIALS ARE TO BE COVERED OR SHOULD MAINTAIN A LEAST TWO FEET OF FREEBOARD IN ACCORDANCE WITH THE REQUIREMENTS OF CVC SECTION 23114. 20.CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ALL DAMAGES TO PUBLIC PROPERTIES THAT ARE CAUSED BY THE WORK ON-SITE. REPAIR MUST BE COMPLETED TO THE SATISFACTION OF THE CITY ENGINEER. 21.MINIMUM ASPHALT PAVEMENT SECTIONS SHALL BE: ·3”AC/6”AB - PARKING AISLES ·4”AC/8”AB - DRIVES [COMMERCIAL] ·4”AC/12”AB - DRIVES [INDUSTRIAL] ·3” A.C. OVER 4” A.B. - PARKING STALLS [MULTI-FAMILY] ·3” A.C. OVER 8” A.B. - DRIVE AISLES [MULTI-FAMILY] 22.EARTHWORK VOLUMES: CUT 700 CUBIC YARDS FILL 475 CUBIC YARDS NET 225 CUBIC YARDS 23.IF THE NET VOLUMES EXCEED 500 CUBIC YARDS, THE CONTRACTOR MUST SUBMIT A HAUL TRUCK ROUTE TO THE CITY FOR APPROVAL. HAUL ROUTE SHALL INCLUDE THE LOCATION OF BORROW AND/OR DISPERSAL SITE, ALL STREETS INCLUDED IN THE ROUTE, THE PROPOSED STAGING AREA AND THE MAXIMUM GROSS WEIGHT OF THE TRUCKS WHEN LOADED. 24.SUBMIT AN 8 ½” X 11” HAUL ROUTE MAP OF APPROPRIATE SCALE WHICH INDICATES THE LOCATION OF THE PROJECT SITE, SHOWING STREETS AND DIRECTION OF HAULING UP TO AND INCLUDING THE END OF THE ROUTE. 25.PURSUANT TO ASSEMBLY BILL 3019, NO EXCAVATION PERMIT IS VALID UNLESS THE CONTRACTOR CONTACTS AND OBTAINS AN INQUIRY I.D. NUMBER FROM “UNDERGROUND SERVICE ALERT” (1-800-422-4133) AT LEAST TWO WORKING DAYS PRIOR TO COMMENCING EXCAVATION. 26.SEPARATE PERMITS MUST BE OBTAINED FROM THE CITY BUILDING AND SAFETY DIVISION FOR THE CONSTRUCTION OF RETAINING WALLS, LIGHT POLES, TRASH ENCLOSURES, ON-SITE PLUMBING AND ALL BUILDING STRUCTURES. 27.ALL FONTS ON PLANS SHOULD BE A MINIMUM OF 0.1”. WATER GENERAL NOTES 1.CONSTRUCTION AND INSTALLATION OF ALL WATER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH THE CITY OF SANTA ANA STANDARD PLANS AND SPECIFICATIONS. WHERE THE STANDARD PLANS ARE SILENT, CONSTRUCTION AND INSTALLATION OF WATER MAINS AND APPURTENANCES SHALL CONFORM TO THE AMERICAN WATER WORKS ASSOCIATION (AWWA) SPECIFICATIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 2012 EDITION. 2.CONSTRUCTION OF WATER MAINS AND APPURTENANCES SHALL ONLY BE PERFORMED BY QUALIFIED CONTRACTORS WITH A VALID CALIFORNIA CONTRACTOR A OR C34 LICENSE. 3.NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA AS A WATER DISTRIBUTION OPERATOR, SHALL BE ALLOWED TO OPERATE THE CITY'S WATER SYSTEM VALVES. 4.NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA AS A WATER DISTRIBUTION OPERATOR, SHALL SHUT WATER SERVICE OFF TO ANY CUSTOMER. 5.PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE CITY FOR REVIEW AND APPROVAL "DISINFECTION AND FLUSHING PLAN" PER THE CITY OF SANTA ANA DESIGN GUIDELINES AND STANDARD DRAWINGS. 6.ALL NEWLY CONSTRUCTED WATER MAINS AND APPURTENANCES SHALL BE DISINFECTED AND TESTED IN ACCORDANCE WITH AMERICAN WATER WORKS ASSOCIATION STANDARD C600'S, PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION SYSTEM. DISINFECTION TESTING RESULTS SHALL BE SUBMITTED TO THE WATER RESOURCES DIVISION WHEN REQUIRED FOR REVIEW AND APPROVAL PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION SYSTEM. 7.WATER MAINS WILL BE HYDROSTATIC TESTED AT 200 PSI FOR 2 HOURS. NEW WATER MAINS CANNOT BE TEST AGAINST AN EXISTING VALVE BUT CAN BE TESTED USING A TEST PLATE. 8.REQUESTS TO SHUT-DOWN THE WATER DISTRIBUTION SYSTEM FOR TIE-INS OR OTHER PURPOSES SHALL BE COORDINATED WITH THE WATER RESOURCES DIVISION STAFF AT LEAST 2 WEEKS IN ADVANCE THROUGH THE CITY INSPECTOR. ALL CUSTOMERS AFFECTED BY THE PROPOSED SHUTDOWN SHALL BE NOTIFIED IN WRITING 48 HOURS IN ADVANCE BY THE CONTRACTOR. 9.THE CITY OF SANTA ANA WATER RESOURCES DIVISION CANNOT GUARANTEE A COMPLETE SHUTDOWN OF EXISTING MAINS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING AND ISOLATION OF CONSTRUCTION FOR TESTING OR ANY OTHER PURPOSES. 10.ALL FIRE HYDRANTS WHICH ARE OUT OF SERVICE OR NEW FIRE HYDRANTS WHICH HAVE NOT BEEN ACCEPTED FOR SERVICE SHALL BE COVERED WITH A SACK INDICATING THAT THE HYDRANTS ARE NOT IN SERVICE. 11.MAINTAINING WATER SERVICE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR ANY SHUTDOWN LASTING LONGER THAN FOUR (4) HOURS. METHOD OF PROVIDING TEMPORARY SERVICE MUST BE APPROVED BY THE WATER RESOURCES DIVISION. THE WATER SHALL BE SAFE FOR DRINKING IN ACCORDANCE WITH STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD (SWRCB) DRINKING WATER PROGRAM (DWP). 12.WATER METER WILL NOT BE INSTALLED NOR WATER TURNED ON UNTIL THE BACKFLOW DEVICES REQUIRED FOR THE BUILDING AND IRRIGATION SYSTEMS HAVE BEEN INSTALLED, TESTED, APPROVED, AND CERTIFIED, AND APPROVED AND SIGNED OFF BY THE CITY. CONTACT WATER RESOURCES DIVISION AT 714-647-3320. 13.ALL WATER MAINS SHALL BE AWWA C-900 PVC, DR14 PIPE OR AWWA C-151 DUCTILE IRON PIPE. ALL OTHER PIPE MATERIALS REQUIRE SPECIAL REVIEW AND APPROVAL FROM THE WATER RESOURCES DIVISION. 14.WATER MAINS SHALL HAVE 36" MINIMUM COVER TO FINISHED GRADE. ANY DEVIATION FROM THIS REQUIREMENT REQUIRES APPROVAL FORM THE WATER RESOURCES DIVISION. 15.CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES AND POINTS OF CONNECTION PRIOR TO TRENCHING. 16.PRIVATE WATER APPURTENANCES SUCH AS BACKFLOW PREVENTORS, FIRE HYDRANTS AND STANDPIPES, AND VALVES SHALL BE PAINTED AS FOLLOWS: 16.1.DOMESTIC WATER:BLUE 16.2.POTABLE IRRIGATION:GREEN 16.3.RECYCLED IRRIGATION:PURPLE 16.4.FIRE PROTECTION:OSHA SAFETY RED 17.DO NOT CUT OR SNAP CUT OR MILL ASBESTOS CEMENT PIPE. WHERE JOINING EXISTING ASBESTOS CEMENT PIPE, EXPOSE SIX FEET IN EACH DIRECTION, LOOKING FOR THE NEAREST JOINT AND JOIN TO NEW PIPE WITH A PROPERLY DIMENSIONED ADAPTER PER STANDARD PLAN 1443. 18.DO NOT TAP EXISTING MAINS WITHOUT THE PRESENCE OF A CERTIFIED WATER INSPECTOR. PRESSURE TEST TAPPING SLEEVE IN THE PRESENCE OF A CERTIFIED WATER INSPECTOR BEFORE TAPPING EXISTING MAIN. 19.FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FILE ARE DELIVERED TO AND ACCEPTED BY THE CITY'S INSPECTOR. SHOW ALL FIELD CHANGES ON RECORD DRAWINGS. 20.TRENCH PLATES SHALL BE FLUSH WITH PAVEMENT AND SHALL BE NON-SKID. 21.WHEN PUBLIC WATER FACILITIES ARE LOCATED ON PRIVATE PROPERTY, EASEMENT DOCUMENTS ARE TO BE SUBMITTED TO CITY FOR APPROVAL PRIOR TO A PERMIT BEING ISSUED. 22.ALL RECYCLED WATER PROJECTS REQUIRE REVIEW AND APPROVAL BY THE WATER RESOURCES DIVISION. 23.REMOVE FROM THE FIELD UPPER AND LOWER FIRE HYDRANT DRY BARREL AND 24"X36" IRON VAULT LID COVERS AND DELIVER UNDAMAGED TO THE CITY WATER RESOURCES DIVISION YARD LOCATED AT 215 S. CENTER STREET. PRIOR NOTIFICATION OF THE DELIVERY IS REQUIRED AT 714-647-3320. 24.WATER MAIN FITTINGS SHALL BE FLANGE OR MECHANICAL JOINTS ONLY, NO PUSH-ON JOINT FITTINGS ALLOWED. 25.CONTRACTOR SHALL NO REMOVE OR DISPOSE EXISTING WATER METERS. CONTRACTOR SHALL APPLY FOR AN ABANDON WATER METER APPLICATION. CONTRACTOR SHALL CONTACT WATER RESOURCES DIVISION AT 714-647-3320 FOR EXISTING METER REMOVALS. 26.INSTALLATION OF NEW WATER METER SERVICE CURB STOP SHALL BE DONE AFTER INSPECTION OF NEW CURB AND GUTTER OR AFTER CONTRACTOR HAS ESTABLISHED THE PROPOSED CURB GRADE BY STAKING OF THE PROPOSED CURB. PUBLIC WORKS AGENCY REVISIONS REFERENCES Underground Service Alert of Southern California Know what's below. before you dig.Call R SEWER GENERAL NOTES 1.CONSTRUCTION AND INSTALLATION OF ALL SEWER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH THE CITY OF SANTA ANA STANDARD PLANS AND SPECIFICATIONS. WHERE THE STANDARD PLANS ARE SILENT, CONSTRUCTION AND INSTALLATION OF SEWER MAINS AND APPURTENANCES SHALL CONFORM TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 2012 EDITION. 2.CONSTRUCTION OF SEWER MAINS AND APPURTENANCES SHALL ONLY BE PERFORMED BY QUALIFIED CONTRACTORS WITH A VALID CALIFORNIA CONTRACTOR A OR C34 LICENSE. 3.ALL NEWLY CONSTRUCTED SEWER MAINS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. ALL NEWLY CONSTRUCTED SEWER MAINS, LATERALS AND MANHOLES MUST BE INSPECTED VIA CLOSED CIRCUIT TELEVISION CAMERA BY A NATIONAL ASSOCIATION OF SEWER SERVICE COMPANIES (NASSCO) CERTIFIED TECHNICIAN AND VIDEO SUBMITTED IN A DIGITAL FORMAT TO THE WATER RESOURCES DIVISION FOR REVIEW AND FINAL ACCEPTANCE OF WORK. 4.ALL SEWER MAINS SHALL BE VITRIFIED CLAY PLAY (VCP) OR PVC SDR-26 PIPE. ALL OTHER PIPE MATERIALS REQUIRE SPECIAL REVIEW AND APPROVAL FROM THE WATER RESOURCES DIVISION. 5.TRENCH PLATES SHALL BE FLUSH WITH PAVEMENT AND SHALL BE NON-SKID. 6.CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES AND POINTS OF CONNECTION PRIOR TO TRENCHING. 7.WHEN PUBLIC SEWER FACILITIES ARE LOCATED ON PRIVATE PROPERTY, EASEMENT DOCUMENTS ARE TO BE SUBMITTED TO CITY FOR APPROVAL PRIOR TO A PERMIT BEING ISSUED. 8.FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FORMAT ARE DELIVERED TO AND ACCEPTED BY THE CITY'S INSPECTOR. SHOW ALL FIELD CHANGES ON RECORD DRAWINGS. 9.ALL SEWER REPAIRS SHALL BE ACCOMPLISHED USING STAINLESS STEEL DOUBLE BANDED COUPLINGS. EROSION AND SEDIMENT CONTROL 1.ALL WORK SHALL BE IN ACCORDANCE WITH THE EROSION CONTROL PLANS, THE PROJECT'S STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AND THE RECOMMENDATION OF SOILS REPORT. 2.EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHENEVER THE DAILY RAINFALL PROBABILITY EXCEEDS 40%. 3.EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL DEVICES AT ALL TIMES. 4.CONTROLS SHALL BE SET UP AND MAINTAINED AS CONSTRUCTION PROCEEDS. ADJUSTMENTS TO THE EROSION CONTROL PLANS ARE ALLOWABLE AS REQUIRED AND APPROVED BY CITY. 5.ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL IMPLEMENT STRUCTURAL AND NONSTRUCTURAL BEST MANAGEMENT PRACTICES (BMPS) IN CONFORMANCE WITH THE GUIDELINES OF THE CALIFORNIA STORM WATER BMP HANDBOOKS. 6.AFTER A RAINSTORM, ALL SEDIMENT AND DEBRIS SHALL BE REMOVED FROM STREETS, BERMS AND DESILTING BASINS, ANY GRADE SLOPE SURFACE PROTECTION MEASURES DAMAGED DURING A RAINSTORM SHALL BE IMMEDIATELY REPAIRED. 7.THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT TRESPASS ONTO AREAS WHERE IMPOUNDED WATER CREATED A HAZARDOUS CONDITION. GENERAL NOTES Behrooz Sarlak 12/15/2025 GS 13 3 . 4 2 GS 13 3 . 2 4 GS 13 3 . 0 9 GS 13 2 . 9 9 DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p VL T 13 2 . 1 9 G GM 12 2 3 13 3 . 8 2 GS 13 2 . 1 9 GS 13 2 . 0 4 GS 13 3 . 0 1 GS 13 3 . 5 0 GS 13 3 . 2 7 HYD IM IM IM IM IM IM IM DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p S SS M H RI M : 1 3 1 . 3 4 S SS M H RI M : 1 3 1 . 4 0 VL T 13 0 . 8 8 VL T 13 0 . 8 0 VL T 13 0 . 7 6 VL T 13 0 . 8 8 GS 13 0 . 6 1 GS 13 0 . 3 9 GS 13 0 . 1 9 GS 13 0 . 3 6 GS 13 0 . 6 7 GS 13 0 . 3 2 FI N I S H E D F L O O R 13 3 . 7 2 S SS M H RI M : 1 3 1 . 4 7 S SS M H RI M : 1 3 1 . 3 9 GS 13 2 . 1 0 GS 13 2 . 6 7 DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p 2 3 3 4 5 6 3 PL PL PL PL PL TRACT 19178 1808 E. FIRST STREET STAFFORD & TUSTIN PORTION OF LOT C APN: 402-201-05 INT E R S T A T E 5 ( I - 5 ) CURB & GUTTER CURB & GUTTER 18" OCSD VCP SEWER MAIN 12" OCSD VCP SEWER MAIN 8" FIRE WATER LINE 3" DOMESTIC WATER LINE 2" IRRIGATION WATER LINE 6" FIRE WATER LINE IRRIGATION METERS 6" SEWER LATERAL ROLLED CURB & GUTTER MASONRY WALL PUMP ROOM CURB CURB & GUTTER CURB RIBBON GUTTER 6" FIRE WATER LINE 6" FIRE WATER LINE 4" STORM DRAINS 4" STORM DRAINS 4" STORM DRAINS 4" STORM DRAINS 4" STORM DRAINS CURB & GUTTER BUILDING OVERHANG BUILDING OVERHANG ROCK SPLASH PAD ROCK SPLASH PAD ROCK SPLASH PAD ASPHALT PAVING CURB CURBCURB CURBCURBCURB CURB CURB CURB CURB ASPHALT PAVING ASPHALT PAVING ASPHALT PAVING CURB (2 . 1 % ) (2 . 3 % ) (1.1%) (1.8% ) (2.2% ) (2 . 2 % ) (0.5%) (0.5%) (0. 4 % ) (1.5%) (1.8%) (0.8%) (2.0%) TRASH ENCLOSURE 133 133 13 3 13 2 134 134 133 132 13 2 13 1 131 FS (134.25) (134.30)FS (134.80)TC (133.83)FS (134.33)TC (133.88)FS (134.38)TC 5-STORY OFFICE BUILDING (133.72)FF (133.54)FS (134.04)TC (134.28)FS (134.78)TC (134.10)FS (134.60)TC (134.15)FS (134.65)TC (133.96)FS (134.46)TC (133.89)FS (134.39)TC (133.98)FS (134.48)TC (133.68)FS (134.18)TC (133.64)FS (134.14)TC (133.02)FS (133.52)TC (133.16)FS (133.66)TC (133.23)FS (133.73)TC (133.53)FS (134.03)TC (134.25)FS (134.75)TC (133.60)FL (134.10)TC (133.37)FL (133.87)TC (133.02)FL (133.52)TC (133.68)FS (134.18)TC (134.09)FS (134.59)TC (134.04)FS (134.54)TC (133.53)FS (134.03)TC (133.88)FS (134.38)TC (133.00)FS (133.50)TC (133.90)FS (134.40)TC FS (133.42) (133.61)FS (134.11)TC (133.16)FS (133.66)TC (133.85)FS (134.35)TC (133.21)FS (133.71)TC (133.46)FS (133.96)TC (132.83)FL (133.33)TC (132.30)FL (132.80)TC (2.5%)(1.3%) (2 . 5 % ) (133.17)FS (133.67)TC (134.05)FS (134.55)TC (133.14)FS (133.64)TC (133.98)FS (134.48)TC (133.16)FS (133.66)TC (132.97)FS (133.47)TC (133.81)FS (134.31)TC (133.25)FS (133.75)TC (134.41)FS (134.91)TC (134.06)FS (134.56)TC (133.27)FS (133.77)TC (132.37)FS (132.87)TC (132.73)FS (133.23)TC (132.87)FS (133.37)TC (133.20)FS (133.70)TC (133.47)FS (133.97)TC (133.13)FS (133.63)TC (133.20)FS (133.70)TC (131.59)FL (132.09)TC (131.77)FL (132.27)TC (133.27)FS (133.77)TC (132.55)FS (133.05)TC (132.71)FS (133.21)TC (132.60)FS (133.10)TC (133.11)FS (133.61)TC (132.29)FL (132.79)TC (132.42)FL (132.92)TC (133.73)FS (134.23)TC (132.23)FS (132.73)TC (132.30)FS (132.80)TC (132.32)FS (132.82)TC (132.47)FS (132.97)TC (132.43)FS (132.93)TC (132.41)FS (132.91)TC (132.21)FS (132.71)TC (132.20)FS (132.70)TC (131.77)FS (132.27)TC (131.82)FS (132.32)TC(132.77)FL (133.27)TC (132.36)FL (132.86)TC (131.99)FL (132.49)TC (131.68)FL (132.18)TC (131.30)FL (131.80)TC (130.99)FL (131.49)TC (130.46)FL (130.96)TC (131.06)FS (131.56)TC (130.39)FL (130.89)TC (130.24)FL (130.74)TC (132.38)FS (132.88)TC (132.34)FS (132.84)TC (131.86)FS (132.36)TC (132.30)FL (132.63)TC (132.46)FL (132.79)TC (132.03)FL (132.36)TC (132.02)FL (132.35)TC FS (132.23) FS (133.39) FS (132.38) FS (131.76) FG (133.14) FG (133.01) FG (132.49) FG (131.47) FG (130.85) (2.4%) (2.4%) (3.2 % ) FS (133.53) (2. 4 % ) (E) FENCE (E) FENCE P W CA B I N E T 13 4 . 4 8 CA B I N E T 13 4 . 4 5 VL T 13 4 . 4 2 VL T 13 4 . 8 5 VL T 13 4 . 4 5 VL T 13 4 . 4 9 TS P IVVL T 13 4 . 3 0 VL T 13 4 . 3 2 VL T 13 4 . 2 6 VL T 13 4 . 2 1 TS TS FD C IM RP P A DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p WM 1 2 1S T S T R E E T PL CURB RIBBON GUTTER FIRE DEPARTMENT CONNECTION IRRIGATION BACKFLOW IRRIGATION METER (0.6%) POST INDICATOR VALVE CABRILLO PARK DRIVE EX. OCSD 18" VCP SEWER MAIN EX. OCSD 12" VCP SEWER MAIN EX. 8" WATER EX. 12" CIP WATER EX. OCSD 12" VCP SEWER MAIN EX. OCSD 18" VCP SEWER MAIN EX. 30" STORM DRAIN EX. 30" STORM DRAIN EX. 18" STORM DRAIN EX. OCSD 12" VCP SEWER MAIN EX. C & G EX. CATCH BASIN EX. C & G STREET CL 52' 42'10' (134.50)FS (135.00)TC (134.08)FS (134.58)TC (134.40)FS (134.90)TC (134.03)FL (134.53)TC (134.30)FS (134.80)TC (134.19)FS (134.69)TC (1.5%) (133.75)FL (134.25)TC (133.67)FL (134.17)TC (134.02)FS (134.52)TC (133.82)FS (134.32)TC FG (134.38) FG (134.76) FG (134.24) FS (134.26) (133.56)FS (134.06)TC (133.81)FS (134.31)TC (133.50)FS (134.00)TC FS (134.48) PUBLIC WORKS AGENCY REVISIONS REFERENCES Underground Service Alert of Southern California Know what's below. before you dig.Call R EASEMENT NOTES EASEMENT TO THE CITY OF SANTA ANA FOR TRAFFIC SIGNAL PURPOSES. 10' WIDE EASEMENT TO ORANGE COUNTY FOR SEWER PURPOSES. EASEMENT TO SOUTHERN CALIFORNIA EDISON FOR UNDERGROUND ELECTRICAL SUPPLY SYSTEMS PURPOSES. 6' WIDE EASEMENT TO SOUTHERN CALIFORNIA EDISON FOR UNDERGROUND ELECTRICAL SUPPLY SYSTEMS PURPOSES. 20' WIDE EASEMENT TO SOUTHERN CALIFORNIA EDISON FOR UNDERGROUND ELECTRICAL SUPPLY SYSTEMS PURPOSES. EASEMENT TO SOUTHERN CALIFORNIA EDISON FOR UNDERGROUND ELECTRICAL SUPPLY SYSTEMS PURPOSES. 1 2 3 4 5 6 0 Scale 1" = 20 ft 10 20 40 60 AS CIVIL ENGINEER OF THIS PROJECT, I HAVE IDENTIFIED THE LOCATION OF ALL EASEMENTS WHICH ARE DEPICTED ON THESE PLANS. I HAVE REVIEWED THE PROPOSED EASEMENT DOCUMENTS AND VERIFIED THE PROPOSED CONSTRUCTION DOES NOT CONFLICT OR INTERFERE WITH THE INTENDED EASEMENT USE. RANDY A CHAPMAN R.C.E. NO.: C69614 DATE MA T C H L I N E - S E E A B O V E MA T C H L I N E - S E E B E L O W Behrooz Sarlak 12/15/2025 B S M BS M # : 2 13 1 . 3 6 ' PK B S M BS M # : 3 13 4 . 5 5 ' PK B S M BS M # : 1 1 5 9 13 3 . 6 0 ' PK DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p HYD IM IM IM IM IM IM IM DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p S SS M H RI M : 1 3 1 . 3 4 S SS M H RI M : 1 3 1 . 4 0 S SS M H RI M : 1 3 1 . 4 7 S SS M H RI M : 1 3 1 . 3 9 EX. 5-STORY BUILDING TO REMAIN PL PL PL PL PL 1 1 1 2 2 2 1 2 2 2 3 3 3 3 3 4 4 4 1 8 4 4 4 5 5 5 5 5 5 6 3 3 3 3 3 3 5 2 5 1 1 1 1 11 1 TRACT 19178 1808 E. FIRST STREET STAFFORD & TUSTIN PORTION OF LOT C APN: 402-201-05 INT E R S T A T E 5 ( I - 5 ) 777 7 7 7 3 3 1 P W TS P IV TS TS FD C IM RP P A DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p WM 1S T S T R E E T PL 1 3 1 4 STREET IMPROVEMENTS PER SEPARATE PLAN CABRILLO PARK DRIVE 7 2 PUBLIC WORKS AGENCY REVISIONS REFERENCES Underground Service Alert of Southern California Know what's below. before you dig.Call R 0 Scale 1" = 20 ft 10 20 40 60 DEMOLITION CONSTRUCTION KEYNOTES / LEGEND SAWCUT LINE. REMOVE EXISTING CONCRETE AND BASE ROCK. REMOVE EXISTING ASPHALT, CURB AND BASE ROCK. REMOVE EXISTING CURB. REMOVE EXISTING LANDSCAPE. EXISTING ELECTRICAL VAULT TO REMAIN, PROTECT IN PLACE. EXISTING ASPHALT TO BE GROUND AND OVERLAID. REMOVE EXISTING ROLLED CURB AND GUTTER. 1 2 3 4 5 6 7 8 DEMOLITION NOTES 1.IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE GEOTECHNICAL ENGINEER 48 HOURS IN ADVANCE OF ANY GRADING AND FILLING OF THE SITE RELATING TO ANY DEMOLITION OR REMOVAL OF SITE FEATURES. 2.IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROTECT FROM DAMAGE THROUGHOUT THE COURSE OF CONSTRUCTION ALL BUILDINGS AND SITE FEATURES ITEMS SUCH AS, BUT NOT LIMITED TO; CATCH BASINS, CONDUIT, TELEPHONE AND POWER POLES, FENCING, RETAINING WALLS, GAS LINES, OIL LINES, GASOLINE LINES, FIRE AND WATER SERVICE ASSEMBLIES, CONCRETE CURB, GUTTER AND SIDEWALK, TREES, BUSHES AND PLANT MATERIAL, ETC. BOTH ON-SITE AND OFF-SITE. THE CONTRACTOR SHALL PROVIDE ALL REPAIRS, MAINTENANCE, SHORING, SUPPORT, ETC. TO MAINTAIN ALL FEATURES DESIGNATED TO REMAIN IF DAMAGED. NOTIFY ARCHITECT/ENGINEER OF RECORD IF ANY DISCREPANCIES EXIST OR IF CLARIFICATIONS ARE REQUIRED. 3.COMPLY WITH ALL APPLICABLE REGULATIONS AND SAFETY ORDERS IN EFFECT AT THE CONSTRUCTION SITE. PROTECT OPEN EXCAVATION, TRENCHES, ETC., WITH FENCES, COVERS, OR RAILINGS AS REQUIRED TO MAINTAIN SAFE PEDESTRIAN AND VEHICLE TRAFFIC. MAINTAIN DESIGNATED SITE ACCESS FOR VEHICLE AND PEDESTRIAN TRAFFIC. 4.THE CONTRACTOR IS RESPONSIBLE FOR THE FINISHED CONDITION OF THEIR WORK. BEFORE WORKING OVER BACKFILL OR SIMILAR WORK COMPLETED BY OTHER CONTRACTORS, VERIFY THAT SUCH WORK HAS BEEN PROPERLY BACKFILLED AND COMPACTED. NOTIFY THE ARCHITECT/ENGINEER OF RECORD PROMPTLY IN WRITING IF ANY CONDITIONS DO NOT MEET THE PROPER STANDARDS. WITHOUT EXTRA COST TO THE OWNER, ALL FEATURES DAMAGED IN THE PERFORMANCE OF ALL WORK SHALL BE RESTORED TO THE SATISFACTION OF THE OWNER AND AUTHORITIES HAVING JURISDICTION. 5.ALL SITE WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE GEOTECHNICAL REPORT. THE OWNER WILL RETAIN THE GEOTECHNICAL ENGINEER TO INSURE CONFORMANCE WITH THE GEOTECHNICAL REPORT. 6.CONTRACTOR ACKNOWLEDGES THAT THEY HAVE THOROUGHLY INFORMED THEMSELVES REGARDING REQUIREMENTS OF DRAWINGS, SPECIFICATIONS, AND REGULATIONS PERTAINING TO THE PROJECT. SPECIFICATIONS AND DRAWINGS ARE COMPLEMENTARY. WHAT IS CALLED BY ONE IS AS BINDING AS IF CALLED FOR BY ALL. THE CONTRACTOR IS TO FAMILIARIZE THEMSELVES WITH THE SITE AND COMPARE REQUIREMENTS OF THE DRAWINGS AND SPECIFICATION WITH WORK TO BE PERFORMED BY THE CONTRACTOR, INCLUDING TOPOGRAPHY, APPROACHES AND IMPROVEMENTS ON OR ABOUT THE SITE. 7.THE ARCHITECT/ENGINEER OF RECORD SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR, THE MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF DEMOLITION WORK, OR FOR THE SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. ANY ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTOR, OR ANY OTHER PERSON PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE WORK OR TO MEET THEIR SCHEDULE WILL MAINTAIN RESPONSIBILITY. 8.CONTRACTOR TO PROVIDE ALL CONSTRUCTION BARRICADES REQUIRED BY GOVERNING AGENCIES AND AS NOTED IN SPECIFICATIONS. MA T C H L I N E - S E E A B O V E MA T C H L I N E - S E E B E L O W Behrooz Sarlak 12/15/2025 GS 13 3 . 4 2 GS 13 3 . 2 4 GS 13 3 . 0 9 GS 13 2 . 9 9 DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p G GM 12 2 3 13 3 . 8 2 GS 13 2 . 1 9 GS 13 2 . 0 4 GS 13 3 . 0 1 GS 13 3 . 5 0 GS 13 3 . 2 7 HYD IM IM IM IM IM IM IM DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p GS 13 0 . 6 1 GS 13 0 . 3 9 GS 13 0 . 1 9 GS 13 0 . 3 6 GS 13 0 . 6 7 GS 13 0 . 3 2 GS 13 2 . 1 0 GS 13 2 . 6 7 DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p S SS M H RI M : 1 3 1 . 3 4 S SS M H RI M : 1 3 1 . 4 0 S SS M H RI M : 1 3 1 . 4 7 S SS M H RI M : 1 3 1 . 3 9 PL PL PL PL PL TRACT 19178 1808 E. FIRST STREET STAFFORD & TUSTIN PORTION OF LOT C APN: 402-201-05 INT E R S T A T E 5 ( I - 5 ) (E) 5-STORY BUILDING TO REMAIN 5. 4 3 ' 134.41'56' 5. 5 6 ' 6.26' 69 . 5 1 ' 2' 4.1 9 ' 91.5' 6' 6' 5' 10.5'6' 16.4' 24.5' 27 . 8 ' 9. 9 ' 9.9' 36' 21 . 8 ' 18.5' P W CA B I N E T 13 4 . 4 9 CA B I N E T 13 4 . 4 8 CA B I N E T 13 4 . 4 5 CA B I N E T 13 4 . 4 7 VL T 13 4 . 4 2 VL T 13 4 . 8 5 VL T 13 4 . 4 5 VL T 13 4 . 4 9 FD C IM RP P A DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p 1S T S T R E E T PL 134.41' CABRILLO PARK DRIVE PROPOSED 4' WIDE PUBLIC STREET EASEMENT TO BE DEDICATED TO THE CITY OF SANTA ANA ST A 3 1 7 + 6 4 . 3 0 C L E . 1 S T S T R E E T =1 0 + 0 0 . 0 0 C L C A B R I L L O P A R K D R I V E ST A 3 1 7 + 6 6 . 8 5 CL D W Y , W = 3 6 ' A= 3 8 ' , X = 3 ' PUBLIC WORKS AGENCY REVISIONS REFERENCES Underground Service Alert of Southern California Know what's below. before you dig.Call R 0 Scale 1" = 20 ft 10 20 40 60MA T C H L I N E - S E E A B O V E MA T C H L I N E - S E E B E L O W Behrooz Sarlak 12/15/2025 GS 13 3 . 4 2 GS 13 3 . 2 4 GS 13 3 . 0 9 GS 13 2 . 9 9 DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p VL T 13 2 . 1 9 G GM 12 2 3 13 3 . 8 2 GS 13 2 . 1 9 GS 13 2 . 0 4 GS 13 3 . 0 1 GS 13 3 . 5 0 GS 13 3 . 2 7 HYD IM IM IM IM IM IM IM DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p VL T 13 0 . 8 8 VL T 13 0 . 8 0 VL T 13 0 . 7 6 VL T 13 0 . 8 8 GS 13 0 . 6 1 GS 13 0 . 3 9 GS 13 0 . 1 9 GS 13 0 . 3 6 GS 13 0 . 6 7 GS 13 0 . 3 2 FI N I S H E D F L O O R 13 3 . 7 2 GS 13 2 . 1 0 GS 13 2 . 6 7 DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p S SS M H RI M : 1 3 1 . 3 4 S SS M H RI M : 1 3 1 . 4 0 S SS M H RI M : 1 3 1 . 4 7 S SS M H RI M : 1 3 1 . 3 9 PL PL PL PL PL TRACT 19178 1808 E. FIRST STREET STAFFORD & TUSTIN PORTION OF LOT C APN: 402-201-05 INT E R S T A T E 5 ( I - 5 ) 5' 9' 9' 5' 9' 12 ' 5' 6.5' B 7 C 7 D 7 FS 134.02 FS 133.47 FS 132.93 FS 132.46 5-STORY OFFICE BUILDING (133.72)FF (132.45)FS 132.95 TC (132.53)FS 133.03 TC (132.38)FS 132.88 TC (132.25)FS 132.75 TC FS 131.58 JOIN-FS (131.57) JOIN-FS (131.29) JOIN-FS (130.56) JOIN-FS (130.31) JOIN-FS (131.60) (132.30)FL (132.63)TC (132.67)FS 133.17 TC (133.04)FS 133.54 TC (133.68)FS 134.18 TC (134.10)FS 134.60 TC (134.04)FS 134.54 TC(133.63)FS 134.13 TC (132.97)FS 133.47 TC (132.62)FS 133.12 TC (132.54)FS (133.04)TC (132.89)FS 133.39 TC (132.67)FS 133.17 TC (132.35)FS (132.85)TC (131.59)FS (132.09)TC (131.67)FS (132.17)TC (132.08)FS 132.58 TC (132.39)FS (132.89)TC JOIN-FS (131.73) JOIN-FS (131.91) 132.70 FS 133.20 TC FS 132.52 FS 133.02 FS 132.92 (132.01)FL (132.34)TC JOIN-FS (132.45) 39 JOIN-FS (133.21) 33 32 33 32 32 32 32 32 42 42 35 35 36 38 38 38 3838 38 38 41 41 41 41 44 41 TRASH ENCLOSURE BY OTHERS SEE ARCHITECTURAL PLANS, SHEET A0.5 39 39 39 39 39 39 38 39 34 33 JOIN-FS (131.73) 32 JOIN-FS (131.71) 41 JOIN-FS (131.89) JOIN-FS (132.31) JOIN-FS (132.53) JOIN-FS (132.84) 34 34 34 32 32 38 38 40 40 JOIN-FS (131.56) JOIN-FS (131.22) JOIN-FS (131.82) (132.36)FS 132.86 TC JOIN-FS (132.06) JOIN-FS (133.19) JOIN-FS (133.32) (E) CURB & GUTTER TO REMAIN (E) CURB TO REMAIN FS (132.59) FS (133.05) JOIN-FS (132.11) FS 132.60 (E) BUILDING FOOTPRINT (E) BUILDING FOOTPRINT (E) BUILDING OVERHANG (E) BUILDING OVERHANG (E) 4" STORM DRAINS (E) 4" STORM DRAINS (E) 4" STORM DRAINS (E) ROCK SPLASH PAD (E) ROCK SPLASH PAD (E) ROCK SPLASH PAD (E) 4" STORM DRAINS (E) 4" STORM DRAINS FS 132.99 FS 133.43 FS 133.47 FS 133.20 PROP. PLANTER AREA PER LANDSCAPE PLANS, SEE SHEET LC.2 45 38 (E) TRASH ENCLOSURE (E) MASONRY WALL PUMP ROOM (133.81)FS 134.31 TC (133.88)FS 134.38 TC (133.60)FL 134.10 TC (133.37)FL 133.87 TC (133.61)FS 134.11 TC (133.25)FS 133.75 TC (133.63)FS 134.13 TC (133.28)FS 133.78 TC 2 3 3 4 5 6 3 FS (132.29) FS (132.34) FS (132.34) FS (132.70) FS (132.76) FS (132.78) FS (132.92) 43 JOIN-FS (132.35) FS 132.12 FS 132.82 133.44 FS 133.94 TC JOIN-FS (132.01) JOIN-FS (132.91) JOIN-FS (132.90) JOIN-FS (132.99) FS 132.11 FS (133.17) JOIN-FS (133.28) 46 FS 132.82 FS 132.83 JOIN-FS (132.30) JOIN-FS (132.16) ACCESSIBLE PATH OF TRAVEL ACCESSIBLE PATH OF TRAVEL ACCESSIBLE PATH OF TRAVEL (E) FENCE TO REMAIN (E) FENCE TO REMAIN (2 . 7 % ) (1.3%) (1.8% ) (1.8% ) (2 . 1 % ) 5. 9 % 4. 7 % 2.5% 1.9% 2.8% (0.5%) (0.5%) (1.5%) (0. 4 % ) (0.9%) (2.0%)(2.3% ) (0 . 7 % ) (1.8%) 0. 3 % 1.8% 0. 4 % 0. 9 % (1 . 2 % ) 1.8% 3.0 % 0.5 % 1.4% 0.7% 2. 0 % 2. 0 % 0.7% 1.4% (2.3%) (2.0%) (0.3% ) (2.3% ) (1.1%) 37 (0 . 7 % ) 47 47 47 47 47 47 47 47 47 47 1.0% 2.1% 0.7 % (0 . 4 % ) (1 . 5 % ) FS (132.01) FS (133.17) (0 . 3 % ) FS 132.32 FS (132.28) FENCED-IN PLAY YARD PER LANDSCAPE PLANS SEE SHEET LC.3 (2 . 6 % ) FS (131.70) P W CA B I N E T 13 4 . 4 9 CA B I N E T 13 4 . 4 8 CA B I N E T 13 4 . 4 5 CA B I N E T 13 4 . 4 7 VL T 13 4 . 4 2 VL T 13 4 . 8 5 VL T 13 4 . 4 5 VL T 13 4 . 4 9 FD C IM RP P A DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p 1S T S T R E E T PL FS 134.44 FS 134.33 STREET IMPROVEMENTS PER SEPARATE PLAN A 7 CABRILLO PARK DRIVE 4' (134.03)FL (134.53)TC (133.75)FL (134.25)TC (133.77)FL (134.27)TC 33 42 39 FS 134.49 FS 134.52 15'x15' SIGHT TRIANGLE 15'x15' SIGHT TRIANGLE FS 134.40 FS 134.50 IMPROVEMENTS PER SEPARATE OFFSITE PLAN AND PERMIT. JOIN-FS (134.24) JOIN-FS (134.56) 7 1 2 (0.6%) 2.0%6.5% 1. 3 % 2.0%0.3% 2.0% 0. 3 % 2. 0 % 47 47 PUBLIC WORKS AGENCY REVISIONS REFERENCES Underground Service Alert of Southern California Know what's below. before you dig.Call R 0 Scale 1" = 20 ft 10 20 40 60 GRADING NOTES 1.EXISTING SURFACE INFORMATION WAS TAKEN FROM A TOPOGRAPHIC SURVEY PROVIDED BY OTHERS. CCE DESIGN ASSOCIATES ASSUMES NO RESPONSIBILITY IN REGARD TO THE ACCURACY OF EXISTING ELEVATIONS AND SURFACE FEATURES. 2.ALL HARDSCAPE ADJACENT TO STRUCTURES SHALL SLOPE AT A MINIMUM OF 2% FOR 5-FEET AWAY FROM THE FOUNDATION. 3.IMPROVEMENTS WITHIN PUBLIC RIGHT OF WAY, INCLUDING (BUT NOT EXCLUSIVE OF) FENCES, DRIVEWAYS, AND UTILITY CONNECTIONS WILL REQUIRE SUBSEQUENT PERMITS FROM THE GOVERNING A.H.J. 4.ADA HANDRAILS, PARKING SIGNS, AND PARKING STRIPING ARE PER ARCHITECTURAL PLANS AND ARE SHOWN HEREON FOR REFERENCE ONLY. 5.TEMPORARY EROSION CONTROL TO BE INSTALLED BETWEEN OCTOBER 1 AND APRIL 15. 6.A DRIVEWAY GATE IS NOT PROPOSED WITH THIS PROJECT. 7.THE ACCESSIBLE PATH ON THIS GRADING PLAN IS SHOWN FOR REFERENCE ONLY. A SEPARATE REVIEW AND APPROVAL OF THE ARCHITECTURAL PLAN, OR ACCESSIBLE PATH PLAN, BY THE PLANNING AND BUILDING AGENCY IS REQUIRED. 8.THE PARKING AND STRIPING ON THIS GRADING PLAN IS SHOWN FOR REFERENCE ONLY. A SEPARATE REVIEW AND APPROVAL OF THE ARCHITECTURAL PLAN, OR PARKING AND STRIPING PLAN, BY THE PLANNING AND BUILDING AGENCY IS REQUIRED. GRADING CONSTRUCTION KEYNOTES / LEGEND CONSTRUCT AC PAVING, MATCH EXISTING PAVEMENT SECTION. CONSTRUCT 6-INCH P.C.C. CURB PER SPPWC STD. PLAN NO. 120-3, TYPE A1-6(150). CONSTRUCT 6-INCH P.C.C. CURB & GUTTER PER CITY OF SANTA ANA STANDARD PLAN NO. 1101, TYPE A-2-6. CONSTRUCT CONCRETE, MATCH EXISTING THICKNESS. CONSTRUCT HARDSCAPE. SEE LANDSCAPE PLANS, SHEET LC.A, FOR PRODUCT SPECIFICATION. CONSTRUCT PERVIOUS PLAY AREA. SEE LANDSCAPE PLANS, SHEET LC.A, FOR PRODUCT SPECIFICATION. ACCESSIBLE PARKING. STRIPING AND SIGNAGE PER ARCHITECTURAL PLANS, SHEET A0.2.3. NEW PARKING LOT STRIPING PER ARCHITECTURAL PLANS, SHEET A0.5. GRIND AND OVERLAY EXISTING ASPHALT PAVEMENT A MINIMUM OF 2", SEE DETAIL A ON SHEET 7. CONSTRUCT ACCESSIBLE RAMP PER SPPWC STD. PLAN NO. 111-5, CASE A, TYPE 1. SEE DETAIL ON SHEET 7. PROPOSED 8' HIGH GATES AND FENCING PER LANDSCAPE PLAN, SHEET LC.2. CONSTRUCT 4-INCH PERVIOUS CONCRETE WALKWAY. SEE LANDSCAPE PLANS, LC.A, FOR PRODUCT SPECIFICATION. CONSTRUCT GUTTER TRANSITION PER DETAIL ON SHEET 7. PROPOSED 10' HIGH METAL SOUND FENCE PER LANDSCAPE PLAN, SHEET LC.2. CONSTRUCT 6-INCH THICK, REINFORCED CONCRETE WALKWAY. CONSTRUCT 10-INCH P.C.C. CURB PER CITY OF SANTA ANA STANDARD PLAN NO. 1101, TYPE B-1. PROPOSED LANDSCAPING. SEE LANDSCAPE PLANS, LPT.1 THRU LPD.2, FOR PLANTING PLANS AND SPECIFICATIONS. ACCESSIBLE PATH OF TRAVEL. 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 MA T C H L I N E - S E E A B O V E MA T C H L I N E - S E E B E L O W EASEMENT NOTES EASEMENT TO THE CITY OF SANTA ANA FOR TRAFFIC SIGNAL PURPOSES. 10' WIDE EASEMENT TO ORANGE COUNTY FOR SEWER PURPOSES. EASEMENT TO SOUTHERN CALIFORNIA EDISON FOR UNDERGROUND ELECTRICAL SUPPLY SYSTEMS PURPOSES. 6' WIDE EASEMENT TO SOUTHERN CALIFORNIA EDISON FOR UNDERGROUND ELECTRICAL SUPPLY SYSTEMS PURPOSES. 20' WIDE EASEMENT TO SOUTHERN CALIFORNIA EDISON FOR UNDERGROUND ELECTRICAL SUPPLY SYSTEMS PURPOSES. EASEMENT TO SOUTHERN CALIFORNIA EDISON FOR UNDERGROUND ELECTRICAL SUPPLY SYSTEMS PURPOSES. PROPOSED 4' WIDE PUBLIC STREET EASEMENT TO BE DEDICATED TO THE CITY OF SANTA ANA. 1 2 3 4 5 6 7 46 47 Behrooz Sarlak 12/15/2025 7. 7 7 % (2 . 2 % ) 4' 0.5% 0.3% 5'5' 8. 1 7 % 2. 0 % 4' 7.2%40 40 4.9%4.5% (0.4%)5'5' 5.5% (132.25)FL (132.58)TC FL 132.29 FL 132.27 (132.20) FL (132.54) TC JOIN-FS (132.91) JOIN-FS (132.90) FS 132.82 FS 132.83 (132.08)FL (132.41)TC FL 132.07 FL 132.05 (132.04) FL (132.37) TC 8' (2 . 2 % ) (2 . 6 % ) (E) 4" ROLLED CURB 9. 4 ' JOIN-FS (132.41) JOIN-FS (132.38) 5. 0 % JOIN-FS (132.18) JOIN-FS (132.16) 5. 0 % FS 132.91 FS 132.91 3.6% JOIN-FS (133.24) JOIN-FS (133.39) (2. 5 % ) FS (133.17) (E) BUILDING OVERHANG (E) BUILDING (FF=133.72) EX. R/W PROP. R/W 4' PROPOSED PUBLIC ROAD EASEMENT STREET IMPROVEMENTS PER SEPARATE PLAN 134.50 FS 134.44 FS 134.47 TC (134.00) JOIN 42 33 EX. GROUND -0.3%(133.85) JOIN-FL (133.93)FS (1.1%) 2.0% 6.5% LANDSCAPING 19' 8' ACCESSIBLE RAMP 6' SIDEWALK 1ST STREET PL 32 EXISTING ASPHALT FINISHED SURFACE PL 32 3342 32 EX. CURB & GUTTER 32(133.37) JOIN (133.25) JOIN(132.49) JOIN 39 LANDSCAPING LANDSCAPING 132.89 FS 132.79 TC -2.0% 10' EASEMENT FOR SEWER PURPOSES 6' SCE EASEMENT 24.73' DRIVE AISLE LANDSCAPING EX. LANDSCAPING 32' ANGLED PARKING STALLS 21.73' DRIVE AISLE 10.8' ANGLED PARKING STALLS PL PROP. PLANTER AREA PER LANDSCAPE PLANS, SEE SHEET LC.2 (131.65) JOIN (131.24) JOIN EX. 5-STORY BUILDING 39 EX. 4" ROLLED CURB & GUTTER EX. PAVEMENT ENTRANCE 10' EASEMENT FOR SEWER PURPOSES 6' SCE EASEMENT (FF=133.72) EXISTING ASPHALT FINISHED SURFACE EX. PLANTER 25.65' DRIVE AISLE (132.28)EG (132.51)TC (133.59)FS-GB (3.3%) (1.6%) (2.5%) 41 (132.75)FS (132.89)FS EX. 5-STORY BUILDING 35 EX. 4" ROLLED CURB & GUTTER 132.40 FS (133.00) JOIN EX. CONC. 2.4% 1.9% 132.63 FS-GB (132.05)FS (131.94)EG (132.23)TC (2.0%) EX. LANDSCAPING (FF=133.72)41 JOIN-FS (132.30) JOIN-FL (132.21) JOIN-FS (132.16) 2.0% JOIN-FL (132.08) JOIN-FS (132.24) JOIN-FS (132.24) 1.3% FL 132.18 JOIN-FS (132.22) (E) FL TRANSITION FL (0 . 9 % ) FL 132.21 FL 132.14 JOIN-FS (132.17) 0. 5 % 2.5'7.6' JOIN-FS (132.29) CONSTRUCT 6" P.C.C. CONCRETE 5.6'2' 3' 10 ' PUBLIC WORKS AGENCY REVISIONS REFERENCES Underground Service Alert of Southern California Know what's below. before you dig.Call R 0 Scale 1" = 20 ft 10 20 40 60 GRIND & OVERLAY DETAIL A ACCESSIBLE RAMP DETAIL SECTION A SECTION B SECTION C GRADING CONSTRUCTION KEYNOTES / LEGEND CONSTRUCT 6-INCH P.C.C. CURB PER SPPWC STD. PLAN NO. 120-3, TYPE A1-6(150). CONSTRUCT 6-INCH P.C.C. CURB & GUTTER PER CITY OF SANTA ANA STANDARD PLAN NO. 1101, TYPE A-2-6. CONSTRUCT HARDSCAPE. SEE LANDSCAPE PLANS, SHEET LC.A, FOR PRODUCT SPECIFICATION. CONSTRUCT CONCRETE, MATCH EXISTING THICKNESS. CONSTRUCT ACCESSIBLE RAMP PER SPPWC STD. PLAN NO. 111-5, CASE A, TYPE 1. SEE DETAIL HEREON. PROPOSED 8' HIGH GATES AND FENCING PER LANDSCAPE PLAN, SHEET LC.2. CONSTRUCT 4-INCH PERVIOUS CONCRETE WALKWAY. SEE LANDSCAPE PLANS, LC.A, FOR PRODUCT SPECIFICATION. 32 33 39 40 41 42 SECTION D GUTTER TRANSITION DETAIL 35 Behrooz Sarlak 12/15/2025 P GS 13 3 . 4 2 GS 13 3 . 2 4 GS 13 3 . 0 9 GS 13 2 . 9 9 DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p VL T 13 2 . 1 9 G GM 12 2 3 13 3 . 8 2 GS 13 2 . 1 9 GS 13 2 . 0 4 GS 13 3 . 0 1 GS 13 3 . 5 0 GS 13 3 . 2 7 HYD IM IM IM IM IM IM IM DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p VL T 13 0 . 8 8 VL T 13 0 . 8 0 VL T 13 0 . 7 6 VL T 13 0 . 8 8 GS 13 0 . 6 1 GS 13 0 . 3 9 GS 13 0 . 1 9 GS 13 0 . 3 6 GS 13 0 . 6 7 GS 13 0 . 3 2 FI N I S H E D F L O O R 13 3 . 7 2 GS 13 2 . 1 0 GS 13 2 . 6 7 DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p W CA B I N E T 13 4 . 4 9 CA B I N E T 13 4 . 4 8 CA B I N E T 13 4 . 4 5 CA B I N E T 13 4 . 4 7 VL T 13 4 . 4 2 VL T 13 4 . 8 5 VL T 13 4 . 4 5 VL T 13 4 . 4 9 FD C IM RP P A DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p S SS M H RI M : 1 3 1 . 3 4 S SS M H RI M : 1 3 1 . 4 0 S SS M H RI M : 1 3 1 . 4 7 S SS M H RI M : 1 3 1 . 3 9 PL PL PL PL PL PL TRACT 19178 1808 E. FIRST STREET STAFFORD & TUSTIN PORTION OF LOT C APN: 402-201-05 INT E R S T A T E 5 ( I - 5 ) (E)18" OCSD VCP SEWER MAIN (E) 8" FIRE WATER LINE (E) 3" DOMESTIC WATER LINE (E) 2" IRRIGATION WATER LINE (E) 6" FIRE WATER LINE (E) FIRE DEPARTMENT CONNECTION TO BE RELOCATED (E) IRRIGATION METERS (E) 6" SEWER LATERAL (E) MASONRY WALL PUMP ROOM (E) 6" FIRE WATER LINE (E) 6" FIRE WATER LINE (E) 4" STORM DRAINS (E) 4" STORM DRAINS (E) 4" STORM DRAINS (E) 4" STORM DRAINS (E) 4" STORM DRAINS (E) ROCK SPLASH PAD (E) ROCK SPLASH PAD (E) ROCK SPLASH PAD (E) 5-STORY BUILDING TO REMAIN 60 (N) DETECTOR LOOPS PER SEPARATE PLAN AND PERMIT 132.37 INV 132.33 FS 132.83 TC P VL T 13 4 . 4 2 VL T 13 4 . 8 5 VL T 13 4 . 4 5 VL T 13 4 . 4 9 IM RP P A DE C D 1 2 " & 1 0 ' D r i p (E) IRRIGATION BACKFLOW (E) IRRIGATION METER 50 51 (N) WATER METER PER SEPARATE PUBLIC STREET PLANS 52 53 PL ULTIMATE R/W 54 55 (E) MONUMENT SIGN 16 ' 10.3' 5' 56 51 ALL EXISTING UTILITIES TO REMAIN AND SERVE EXISTING BUILDING UNLESS OTHERWISE NOTED. PUBLIC WORKS AGENCY REVISIONS REFERENCES Underground Service Alert of Southern California Know what's below. before you dig.Call R 0 Scale 1" = 20 ft 10 20 40 60 WATER CONSTRUCTION KEYNOTES CONSTRUCT 2" TYP K SOFT COPPER IRRIGATION WATER LINE. CONNECT TO EXISTING IRRIGATION BACKFLOW. (32 LF) REMOVE EXISTING IRRIGATION WATER LINE BETWEEN 3" DOMESTIC LINE AND BACKFLOW. (23 LF) CONSTRUCT 8" DR 14, C900 PVC PIPE FIRE WATER LINE AND INSTALL COMPACT DOUBLE CHECK DETECTOR ASSEMBLY PER STANDARD PLAN NO. 1433B. EX. PIPE TO BE ABANDONED IN PLACE. (28 LF, 1 EA.) CONSTRUCT 3" DR 14, C900 PVC PIPE DOMESTIC WATER LINE AND INSTALL COMPACT REDUCED PRESSURE PRINCIPLE ASSEMBLY PER STANDARD PLAN NO. 1438. EX. PIPE TO BE ABANDONED IN PLACE. (61 LF, 1 EA.) EXISTING FIRE BACKFLOW DEVICE REMOVAL FROM VAULT PER SEPARATE PUBLIC STREET PLANS. EXISTING WATER METER TO REMAIN. NEW VAULT TO BE CONSTRUCTED PER SEPARATE PUBLIC STREET PLANS. EXISTING PIV TO BE REMOVED PER SEPARATE PUBLIC STREET PLANS. 50 52 STORM DRAIN CONSTRUCTION KEYNOTES CONSTRUCT 4" STORM DRAIN. CONNECT TO EXISTING DRAINS AND OUTLET THRU CURB. MATCH EXISTING MATERIAL AND SLOPE.60 53 SEE UTILITY DETAIL HEREON UTILITY DETAIL 54 55 56 52 52 33 LF Behrooz Sarlak 12/15/2025 P GS 13 3 . 4 2 GS 13 3 . 2 4 GS 13 3 . 0 9 GS 13 2 . 9 9 DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 8 " & 1 2 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p VL T 13 2 . 1 9 G GM 12 2 3 13 3 . 8 2 GS 13 2 . 1 9 GS 13 2 . 0 4 GS 13 3 . 0 1 GS 13 3 . 5 0 GS 13 3 . 2 7 HYD IM IM IM IM IM IM IM DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p VL T 13 0 . 8 8 VL T 13 0 . 8 0 VL T 13 0 . 7 6 VL T 13 0 . 8 8 GS 13 0 . 6 1 GS 13 0 . 3 9 GS 13 0 . 1 9 GS 13 0 . 3 6 GS 13 0 . 6 7 GS 13 0 . 3 2 FI N I S H E D F L O O R 13 3 . 7 2 GS 13 2 . 1 0 GS 13 2 . 6 7 DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p DE C D 1 6 " & 1 0 ' D r i p W CA B I N E T 13 4 . 4 9 CA B I N E T 13 4 . 4 8 CA B I N E T 13 4 . 4 5 CA B I N E T 13 4 . 4 7 VL T 13 4 . 4 2 VL T 13 4 . 8 5 VL T 13 4 . 4 5 VL T 13 4 . 4 9 FD C IM RP P A DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p DE C D 1 2 " & 1 0 ' D r i p S SS M H RI M : 1 3 1 . 3 4 S SS M H RI M : 1 3 1 . 4 0 S SS M H RI M : 1 3 1 . 4 7 S SS M H RI M : 1 3 1 . 3 9 PL PL PL PL PL PL TC-1 TC-3 SE-5 SE-5 SE-5 SE-5 TRACT 19178 1808 E. FIRST STREET STAFFORD & TUSTIN PORTION OF LOT C APN: 402-201-05 INT E R S T A T E 5 ( I - 5 ) CONTRACTOR TO PROTECT NEAREST DOWNSTREAM STORM DRAIN INLETS WITHIN 1ST STREET (E) FENCE TO REMAIN (E) FENCE TO REMAIN A SE-6 SE-6 SE-6 SE-6 (E) WALL TO REMAINSE-7 WM-8 WM-9 PUBLIC WORKS AGENCY REVISIONS REFERENCES Underground Service Alert of Southern California Know what's below. before you dig.Call R 0 Scale 1" = 20 ft 10 20 40 60 EROSION CONSTRUCTION NOTES / LEGEND CONSTRUCT 6' HIGH CHAIN LINK FENCE AND GATE WITH GREEN SCREEN. FIBER ROLLS PER CASQA BMP SE-5. GRAVEL BAG BERM PER CASQA BMP SE-6 (ACCEPTABLE SUBSTITUTE FOR FIBER ROLLS) STABILIZED CONSTRUCTION ENTRANCE / EXIT PER CASQA BMP TC-1. SEE DETAIL 1 ON SHEET ED01. STREET SWEEPING AND VACUUMING PER CASQA BMP SE-7 CONCRETE WASTE MANAGEMENT PER CASQA BMP WM-8. SANITARY/SEPTIC WASTE MANAGEMENT PER CASQA BMP WM-9. THE FOLLOWING CASQA BMPS ARE PART OF THE EROSION CONTROL PLAN; HOWEVER, ARE NOT LOCATION BASED AND CANNOT BE SHOWN HEREON: SCHEDULING PER CASQA BMP EC-1 WIND EROSION CONTROL PER CASQA BMP WE-1 ENTRANCE / OUTLET TIRE WASH PER CASQA BMP TC-3 PAVING AND GRINDING OPERATIONS PER CASQA BMP NS-3. CONCRETE CURING OPERATIONS PER CASQA BMP NS-12. CONCRETE FINISHING PER CASQA BMP NS-13. MATERIAL DELIVERY AND STORAGE PER CASQA BMP WM-1. MATERIAL USE PER CASQA BMP WM-2. STOCKPILE MANAGEMENT PER CASQA BMP WM-3. SPILL PREVENTION AND CONTROL PER CASQA BMP WM-4. TEMPORARY EROSION CONTROL PRIOR TO COMPLETION OF FINAL IMPROVEMENTS SHALL BE PERFORMED BY THE CONTRACTOR AS INDICATED BELOW: 1.ALL GRADED AREAS ARE TO RECEIVE HYDROSEED EROSION CONTROL. HYDROSEEDING TO EXTEND 5 FT BEYOND DAYLIGHT LINES. 2.EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ONSITE AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS IMMINENT. 3.DEVICES SHOWN ON PLAN SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER. 4.THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER AFTER EACH RUNOFF PRODUCING RAINFALL. 5.THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6.THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION. 7.ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8.GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF THE SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 9.TEMPORARY EROSION CONTROL DEVICES ARE TO REMAIN IN PLACE UNTIL HYDROSEEDED AREAS ARE ESTABLISHED AND NO EROSION IS EVIDENT. 10.EXCEPT AS OTHERWISE DIRECTED BY THE CITY INSPECTOR, ALL DRAINAGE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF THE WORKING DAY WHEN THE 48 HOUR FORECAST OF RAIN PROBABILITY IS 40% AND MAINTAINED DURING THE RAINY SEASON FROM OCTOBER 15TH TO APRIL 15TH OF THE SUCCEEDING YEAR. 11.EROSION CONTROL DEVICES MUST BE IN PLACE DURING THE ABOVE STATED PERIOD. 12.CLEAN OUT MUD AND SILT AFTER EACH RAIN OR AS DIRECTED BY THE CITY INSPECTOR. 13.THE LOCATIONS OF THE GRAVEL BAGS AS SHOWN MAY VARY DUE TO THE FIELD CONDITIONS AND ADDITIONAL GRAVEL BAGS MAY BE REQUIRED AS DIRECTED BY THE CITY INSPECTOR. 14.FIBER ROLLS MAY BE USED IN PLACE OF GRAVEL BAGS AND SPACING IS TO BE PER STREET SCHEDULE HEREON BELOW AND SHALL BE PLACED BY FIELD CONDITIONS ALSO, DRIVEWAYS SHALL HAVE GRAVEL BAGS PLACED AT 50 FOOT INTERVALS. 15.PLACE MIRAFI FILTER FABRIC INSERT INTO CATCH BASIN OPENING AND PROTECT WITH GRAVEL BAGS (BMP SE-10). NOTE: THE LOCATION AND DESIGN OF ALL EROSION CONTROL MEASURES SHOWN ON THESE PLANS ARE TENTATIVE ONLY AND ARE SUBJECT TO REVISIONS AS DETERMINED BY THE RESIDENT INSPECTOR OR THE CITY ENGINEER. ACTUAL EROSION CONTROL MEASURES SHALL BE INSTALLED TO THE SATISFACTION OF THE RESIDENT INSPECTOR, AS CONDITIONS WARRANT. SILT, DEBRIS, AND MUD SHALL BE PROMPTLY REMOVED FROM ALL EROSION CONTROL STRUCTURES AFTER EACH RAIN TO THE SATISFACTION OF THE RESIDENT INSPECTOR. THE CITY MAY CONDUCT REGULAR SITE INSPECTIONS TO ASSESS CHANGING CONDITIONS AND DETERMINE THE NECESSITY OF ADDITIONAL CONTROL MEASURES. 1.THE CONTRACTOR SHALL BE RESPONSIBLE TO INSTALL ALL EROSION CONTROL FACILITIES AS SHOWN ON THE APPROVED EROSION CONTROL PLAN OR AS DIRECTED BY THE CITY ENGINEER AT THE END OF EACH WORKING DAY. 2.THE CONTACT PERSON RESPONSIBLE FOR EROSION CONTROL IS INDICATED HERE: INGRID CANEDO 24 HOUR CONTACT TELEPHONE NUMBER: (818) 309-3664 EROSION CONTROL NOTES SE-5 TC-1 EC-1 SE-6 SE-7 WE-1 TC-3 NS-3 NS-12 NS-14 WM-1 WM-2 WM-3 WM-4 WM-8 WM-9 A Behrooz Sarlak 12/15/2025 PUBLIC WORKS AGENCY REVISIONS REFERENCES Underground Service Alert of Southern California Know what's below. before you dig.Call R STABILIZED CONSTRUCTION ENTRANCE1 Behrooz Sarlak 12/15/2025