Laserfiche WebLink
ROOM NAME <br />101 <br />101 <br />1 <br />1 <br />1 <br />ROOM NAME/NUMBER <br />DOOR NUMBER <br />WINDOW NUMBER <br />KEYNOTE <br />WALL TYPE <br />REVISION NUMBER <br />REVISION CLOUD <br />FIXTURE/ACCESSORY INDICATOR <br />A <br />1i <br />DATE: <br />P.M.: <br />DRAWN BY: <br />JOB NO.: <br />26081 Merit Cir, STE 111 <br />Laguna Hills, CA 92653 <br />909-257-7040 WWW.BNDESIGNBUILDINC.COM <br />THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF BN <br />DESIGN BUILD AND SHALL NOT BE USED FOR ANY OTHER WORK <br />EXCEPT BY AGREEMENT WITH BN DESIGN BUILD. <br />D ES I GNBUILDCNI <br />7/ <br />2 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />1 <br />0 <br />: <br />2 <br />8 <br />: <br />5 <br />0 <br /> <br />A <br />M <br />A0.1 <br />B.N. <br />F.M. <br />TITLE SHEET <br />07.11.24 <br />2024001108 <br />UNIT 2, 606 S VAN <br />NESS AVE, <br />SANTA ANA, CA <br />92701 <br />ACCESSORY <br />DWELLING <br />UNIT <br />ACCESSORY DWELLING UNIT <br />SHEET <br />NUMBER SHEET NAME <br />A0.1 TITLE SHEET <br />A0.2 GENERAL NOTES <br />A0.3 TITLE 24 <br />A0.4 MANDATORY RESIDENTIAL MEASURES <br />A0.5 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />A0.6 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />A1.0 EXISTING SITE PLAN <br />A1.1 PROPOSED SITE PLAN <br />A2.0 EXISTING FLOOR PLAN <br />A2.1 PROPOSED FLOOR PLAN <br />A2.2 ADU FLOOR PLAN <br />A2.3 ELECTRICAL PLAN <br />A3.0 NORTH AND SOUTH ELEVATIONS <br />A3.1 EAST AND WEST ELEVATIONS <br />A3.2 SECTION <br />A4.0 WINDOW & DOOR SCHED., TYPES,& NOTES <br />A5.0 DETAILS <br />G1.0 DRIANGE PLAN <br /> <br />UNIT 2, 606 S VAN NESS AVE, <br />SANTA ANA, CA 92701 <br />DESIGNER <br />TETSUYA TAKEUCHI <br />EMAIL: TEDITAKEUCHI@GMAIL.COM <br />PHONE: 949 243 4783 <br />SUBCONTRACTOR SHALL VERIFY ALL PLANS, EXISTING DIMENSIONS & <br />FIELD CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY <br />THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE <br />PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME. <br />ARCHITECTURAL <br />STRUCTURAL <br />PROJECT DESCRIPTION <br />PROJECT INFORMATION <br />DO NOT SCALE DRAWINGS <br />SHEET INDEX <br />PROJECT TEAM <br />VICINITY MAPSYMBOLS LEGEND <br />ABBREVIATIONS GENERAL NOTES <br />Vinyl Composition TileV.C.T. <br />Outside Diameter (DIM.) <br />Powder Actuated Device <br />Combination Paper TowelDispenser & Receptacle <br />ReinforcedREINF. <br />FLASH.Flashing <br />Face of Concrete <br />Face of Sheathing <br />F.O.F.F.O.C.FLUOR.Fluorescent <br />Face of Finish <br />FTG.FT.F.S.FPRF. <br />Footing <br />F.O.SH. <br />Foot or FeetFull SizeFireproof <br />F.O.S.Face of Studs <br />RequiredREQ.RESIL.RM.ResilientRoomR.O.Rough OpeningRUB.Rubber <br />Expansion Bolt <br />Expansion Joint <br />Electrical Panelboard <br />Electrical Water Cooler <br />Fire ExtinguisherFire Extinguisher Cab. <br />Flat Head Wood ScrewFire Hose Cabinet <br />DIA.DET.DetailDiameter <br />DR. <br />DWG.D.S.P.DS.DWR. <br />D.O.DN. <br />DoorDrawer <br />Drawing <br />DownDISP.Dispenser <br />Door Opening <br />DownspoutDry Standpipe <br />ELEV.ELEC.EL.E.J. <br />EA.E.B. <br />E.EachEast <br />Elevator <br />ElevationElectrical <br />DIM.Dimension <br />EXP.EXPO.EXST.E.W.C.EQPT.EQ.E.P.ENGR.ENCL. <br />Equal <br />ExistingExposed <br />Enclosure <br />Equipment <br />Expansion <br />Engineer <br />F.E.C.F.E.FDN.F.D.F.B.F.A.Flat BarFloor DrainFoundation <br />Fire Alarm <br />EXT.Exterior <br />FL.FIXT.FIN.F.H.W.S FinishFixtureFloor <br />F.H.C. <br />EMER.Emergency <br />Not In ContrastN.N.I.C.North <br />Not To Scale <br />On Center <br />N.T.S. <br />O.A.OBS.O.C.O.D. <br />OverallObscure <br />NOM.Nominal <br />P.A.D.Pre-castPRCST. <br />P.Paint <br />Opposite Hand <br />Opposite <br />O.H.OPNG.OPP.Opening <br />OFF.Office <br />NO. or #Number <br />Paper Towel Dispenser <br />Plastic Laminate <br />PT.PointP.T.D.P.T.D/R <br />P.LAM.PLAS.PLYWD.PR. <br />PlasterPlywoodPair <br />Paper Towel Reptacle <br />Quarry TileQ.T.QTY.Quantity <br />P.T.R.PartitionPTN. <br />Roof DrainReferenceRefrigeratorREF.REFR.RGTR.Register <br />RAD.R.D.RadiusR.Riser <br />PL.Plate <br />Verify in fieldVestibuleVertical <br />West <br />Wall CoveringWater Closet <br />Wide FlangeWhere Occurs <br />With <br />Wood <br />Without <br />Water Resistant <br />Waterproof <br />WeightWainscot <br />VESTV.I.F. <br />W. <br />W.C.WDW.F.W.O. <br />W/WC. <br />WT.W.R. <br />WP.W/O <br />WSCT. <br />VERT. <br />HDWE.HardwareAbove Finish Floor <br />Construction Joint <br />Cased Opening <br />ACOUS. <br />ADJ.A.D.Adjustable <br />AcousticalArea Drain <br />APPROX. <br />A.F.F.ASPH.ASB.ARCH. <br />Asphalt <br />A.P.ALT.AL. <br />ApproximateArchitecturalAsbestos <br />AluminumAlternateAccess Panel <br />AGGR.Aggregate <br />BKG. <br />BM.BLKG.BLK.BLDG. <br />BITUMBD.B.B. <br />BackingBuildingBlockBlockingBeam <br />BoardBulletin Board <br />Bituminous <br />C.G.C.J. <br />CAB. <br />C.I.CER.CEM.C.B.Cabinet <br />CementCeramic <br />Corner Guard <br />Catch Basin <br />Cast Iron <br />BOT.Bottom <br />CONSTR.CONN.CONC.COL.C.O.CLR.CLO.CLKG.CalkingClosetClear <br />ColumnConcreteConnectionConstruction <br />CTR.CNTR.CTSKCPT.CORR.CorridorCarpet <br />CounterCenter <br />Countersunk <br />CONT.Continuous <br />CLG.Ceiling <br />HR.HORIZ.H.M. <br />Hour <br />Hollow MetalHorizontal <br />INTER.INT.INSUL.INFO.INC.I.D.IncandescentInformationInsulation <br />IntermediateInterior <br />Inside Diameter (Dim.) <br />HGT.Height <br />Kit. <br />JT.JAN. <br />Kitchen <br />JanitorJoint <br />LaboratoryLaminateLavatory <br />MasonaryMAS.MAT.Material <br />LAB.LAM.LAV.LKR.LT.LockerLight <br />MET.MetalManufacturer <br />Minimum <br />MFR.MH.MIN.Manhole <br />Machine BoltMedicine CabinetMechanicalMembrane <br />M.B.M.C.MECH.MEMB. <br />MiscellaneousMasonry Opening <br />MUL.Mullion <br />MISC.M.O.MTD.Mounted <br />MIR.Mirror <br />MaximumMAX. <br />Diameter or RoundPound or Number# <br />@ <br />&AndAngleAtCenterline <br />A.B. <br />(N)(R)NewRelocated <br />Anchor Bolt <br />(E)Existing <br />GA. <br />GR.GND.GL.G.B.GALV.GuageGalvanizedGrab BarGlassGroundGrade <br />HDWD.H.C.H.B.Hose BibbHollow CoreHardwood <br />GYP.Gypsum <br />ShelfSH. <br />SheetSimilar <br />Shower <br />Sanitary Napkin DispenserSanitary Napkin ReceptacleSpecificationSee Pluming Drawing <br />See Structural DrawingStainless Steel <br />Square <br />See Mechanical DrawingSheet Metal Screw <br />SuspendedSymmetrical <br />StorageStructural <br />StationStandardSteel <br />Tongue and Groove <br />Top of Pavement <br />ThickThreshold <br />Top of Curb <br />TreadTowel Bar <br />TelephoneTerrazzo <br />Service Sink <br />Telephone PanelboardToilet Paper Dispenser <br />Top of WallTelevision <br />Typical <br />Top of Parapet <br />Top of Sheathing <br />Unless Otherwise NotedUrinal <br />Unfinished <br />SHT.SIM. <br />SHR. <br />SQ. <br />S.ST. <br />SYM. <br />STA.STD.STL. <br />THK. <br />T.B.T.C.TEL.TER. <br />TRD. <br />T.V. <br />TYP. <br />UR. <br />UNF. <br />T.&G. <br />T.O.PV. <br />U.O.N. <br />T.P.B.T.P.D. <br />T.O.W. <br />THRES. <br />S.N.D. <br />STOR. <br />SUSP.STRL. <br />S.P.D. <br />S.S.D. <br />S.SK. <br />S.N.R.SPEC. <br />S.M.D.S.M.S. <br />T.O.P. <br />T.O.SH. <br />See Architectural Drawing <br />Rain Water LeaderRedwood <br />South <br />RWD. <br />S. <br />R.W.L. <br />S.A.D. <br />Seat Cover Dispenser <br />Soap Dispenser <br />See Electrical Drawing <br />Schedule <br />SectionS.D. <br />S.C.D.SCHED. <br />SECT.S.E.D. <br />Solid CoreS.C. <br />PROJECT DATA <br />1. THIS PROJECT AND ALL WORK ASSOCIATED WITH THE PROJECT <br />SHALL CONFORM TO STATE AND LOCAL CODE JURISDICTIONS. <br />2. THE TERM DESIGNER AS USED IN THESE DOCUMENTS SHALL REFER <br />TO BN DESIGN BUILD INC. <br />3. THE DESIGNER SHALL NOT HAVE CONTROL OR CHARGE OF AND <br />SHALL NOT BE RESPONSIBLE FOR MEANS, METHODS, TECHNIQUES, <br />SEQUENCE ON PROCEDURE, OR FOR SAFETY PRECAUTIONS AND <br />PROGRAMS IN CONNECTION WITH THE WORK, ALL WHICH SHALL BE <br />THE SOLE RESPONSIBILITY OF THE CONTRACTOR. <br />4. SHORING, TEMPORARY SUPPORTS, AND SAFETY OF ERECTION <br />BRACING DURING DEMOLITION AND / OR CONSTRUCTION IS THE SOLE <br />RESPONSIBILITY OF THE CONTRACTOR AND HAS NOT BEEN <br />CONSIDERED BY THE STRUCTURAL ENGINEER OR THE DESIGNER. <br />5. ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE <br />ACCOMPLISHED BY A CONTRACTOR OTHER THAN THE GENERAL <br />CONTRACTOR AND IS NOT TO BE PART OF THE CONSTRUCTION <br />AGREEMENT. THE GENERAL CONTRACTOR SHALL COORDINATE WITH <br />"OTHER"CONTRACTORS PER REQUIREMENTS ESTABLISHED BY THE <br />OWNER. <br />6. THE GENERAL CONTRACTOR AND ALL SUB CONTRACTORS ARE <br />RESPONSIBLE FOR EXAMINING CONTRACT DOCUMENTS, FIELD <br />CONDITIONS, AND CONFIRMING THAT WORK IS BUILDABLE AS SHOWN <br />BEFORE PROCEEDING WITH CONSTRUCTION. IF THERE ARE ANY <br />QUESTIONS REGARDING THESE OR OTHER COORDINATION ITEMS, THE <br />CONTRACTOR IS RESPONSIBLE FOR OBTAINING CLARIFICATION <br />BEFORE PROCEEDING WITH WORK IN QUESTIONS OR RELATED WORK. <br />7. CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF <br />CONSTRUCTION CHANGES (AS-BUILT DRAWINGS) AND SHALL PROVIDE <br />SAID DOCUMENTATION TO THE OWNER & DESIGNER UPON <br />COMPLETION OF CONSTRUCTION. <br />8. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO <br />COORDINATE WITH ALL SUB CONTRACTORS PER REQUIREMENTS <br />ESTABLISHED BY THE OWNER, WHICH ARE UNDER SEPARATE <br />CONTRACT WITH THE OWNER. <br />9. THE STRUCTURAL, ELECTRICAL, MECHANICAL, & PLUMBING & OTHER <br />DRAWINGS AND JOB SPECIFICATIONS ARE SUPPLEMENTARY TO THE <br />DESIGNERURAL CONSTRUCTION DRAWINGS. ANY DISCREPANCY <br />BETWEEN THESE DOCUMENTS SHALL BE IMMEDIATELY BRING TO THE <br />ATTENTION OF THE DESIGNER FOR CLARIFICATION. <br />10. THEN INTENT OF DRAWINGS AND SPECIFICATIONS IS TO INCLUDE <br />ALL LABOR, MATERIALS & SERVICES NECESSARY FOR THE <br />COMPLETION OF ALL WORK SHOWN, DESCRIBED, OR REASONABLY <br />IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED ON THE <br />CONTRACT DOCUMENTS. <br />11. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT <br />IN STRICT ACCORDANCE WITH THE MANUFACTURER <br />RECOMMENDATIONS, UNLESS NOTED OTHERWISE. <br />12. ANY WORK INSTALLED IN CONFLICT WITH THE CONSTRUCTION <br />DRAWINGS, WITHOUT THE PRIOR APPROVAL OF THE OWNER AND THE <br />DESIGNER SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. <br />13. THE GENERAL CONTRACTOR SHALL NOTIFY THE DESIGNER <br />IMMEDIATELY OF ANY SPECIFIED MATERIALS OR EQUIPMENT WHICH <br />ARE EITHER UNAVAILABLE OR THAT WILL CAUSE A DELAY IN THE <br />CONSTRUCTION COMPLETION SCHEDULE. THE CONTRACTOR SHALL <br />SUBMIT CONFIRMATIONS OF DELIVERY DATES FOR ORDERS OF <br />MATERIALS AND EQUIPMENT HAVING LONG LEAD TIMES. <br />14. ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SHALL BE <br />SUBMITTED IN WRITING TO THE DESIGNER. SUBSTITUTIONS SHALL BE <br />OF EQUAL QUALITY. <br />15. UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS, THE <br />CONTRACTOR SHALL SUBMIT 3 SETS OF SHOP DRAWINGS. <br />FABRICATION SHALL NOT BEGIN UNTIL AFTER RECEIVING THE <br />DESIGNER'S OR ENGINEER'S APPROVAL. <br />16. THE DESIGNER'S REVIEW OF SHOP DRAWINGS SHALL NOT RELIEVE <br />THE GENERAL CONTRACTOR OR SUBCONTRACTOR FROM <br />RESPONSIBILITY FOR DEVIATIONS FROM THE DRAWINGS AND <br />SPECIFICATIONS UNLESS HE HAS, IN WRITING, AND BROUGHT TO THE <br />ATTENTION OF THE DESIGNER SUCH DEVIATIONS AT THE TIME OF THE <br />SUBMISSION, NOR SHALL IT RELIEVE HIM FROM RESPONSIBILITY FOR <br />ERRORS OF ANY SORT IN THE SHOP DRAWINGS. <br />17. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />OBTAINING ALL REQUIRED BUILDING PERMITS PRIOR TO STARTING <br />CONSTRUCTION. <br />18. PRIOR TO THE ISSUANCE OF A BUILDING PERMIT, THE APPLICANT <br />SHALL HAVE EVIDENCE OF CURRENT WORKMAN'S COMPENSATION <br />INSURANCE COVERAGE ON FILE WITH THE STATE LABOR CODES. <br />19. CONTRACTOR PROVIDE CONTINUOUS INSPECTIONS AS SET FORTH <br />IN LOCAL AND STATE CODES AND PER THE CONTRACT DOCUMENTS AS <br />NEEDED. <br />20. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE <br />PROJECT AND SURROUNDING AREAS FREE FROM TRASH AND DEBRIS. <br />THE WORK SHALL BE IN CONFORMANCE WITH THE AIR & WATER <br />POLLUTION CONTROL STANDARDS AND REGULATIONS OF THE STATE <br />DEPARTMENT OF HEALTH. <br />21. CONSTRUCTION WASTE & DEBRIS SHALL BE DEPOSITED AT AN <br />APPROPRIATE SITE. <br /> <br />22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL <br />CLEANING OF THE JOB AFTER COMPLETION. <br />23. THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, <br />WHERE REQUIRED PER STATE AND LOCAL CODES. <br />24. IF TRENCHES OR EXCAVATIONS 5'-0" OR MORE IN DEPTH ARE <br />REQUIRE, OBTAIN A BUILDING OR GRADING PERMIT. <br />25. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN <br />THE BUILDING WHICH DOES NOT COMPLY WITH THE LOCAL FIRE <br />AUTHORITY AND STATE & COUNTY REQUIREMENTS. <br />26. THE CONTRACTOR IS RESPONSIBLE FOR BLOCKING OFF SUPPLY & <br />RETURN AIR GRILLES & DUCTS TO KEEP DUST FROM ENTERING INTO <br />THE BUILDING DISTRIBUTION SYSTEMS. <br />27. ALL CONSTRUCTION & DEMOLITION SHALL BE DONE IN <br />ACCORDANCE WITH LOCAL & STATE CODES. <br />28. UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON <br />THESE DOCUMENTS SHALL BE TO FACE OF CURB, FACE OF <br />CONCRETE, FACE OF FINISH OR CENTERLINE OF GRIDS. <br />29. ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, <br />UNLESS NOTED OTHERWISE. <br />30. DIMENSIONS TAKE PRECEDENCE. DO NOT SCALE THE DRAWINGS. <br />LARGER DETAILED DRAWINGS TAKE PRECEDENCE OVER SMALLER <br />SCALED DRAWINGS. <br />31. WHERE ELECTRICAL, MECHANICAL, OR PLUMBING ITEMS <br />PENETRATE A FOOTING, SLAB, WALL CEILING ETC. IT IS REQUIRED <br />THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE <br />FURNISHED. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF <br />ALL ITEMS WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE <br />INSTALLATION. ANY CONFLICT WITH THE CONSTRUCTIONS <br />DOCUMENTS, SHALL BE BROUGHT TO THE DESIGNER'S ATTENTION <br />IMMEDIATELY. <br />32. THE CONTRACTOR SHALL PROVIDE AND LOCATE ACCESS PANELS <br />IN WALLS & CEILING CONSTRUCTION AS REQUIRED TO PROVIDE <br />ACCESS TO FIRE SPRINKLER, MECHANICAL, PLUMBING & ELECTRICAL <br />WORK. CONTRACTOR SHALL SUBMIT A PLAN OF ALL PROPOSED <br />ACCESS PANEL TO THE DESIGNER FOR APPROVAL. <br />33. ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE <br />PROTECTED TO MAINTAIN RATING. <br />34. INTERIOR WALLS & CEILINGS SHALL BE INSTALLED IN ACCORDANCE <br />TO STATE & LOCAL CODES, INCLUDING REQUIREMENTS FOR FLAME <br />SPREAD AND SMOKE DENSITY RATINGS FOR FINISH MATERIALS. <br />35. ALL NEW CONSTRUCTION MATERIALS SHALL BE 100% ASBESTOS <br />FREE. <br />36. ALL INSPECTIONS SHALL BE CALLED FOR AND PASSED BEFORE ANY <br />WORK CONTINUES TO THE NEXT PHASE. <br />37. MANDATORY SPECIAL INSPECTIONS PER THE REQUIREMENTS OF <br />THE ENGINEERING SUBMITTED AND I.C.C. PORTIONS OF THIS PROJECT <br />REQUIRE SPECIAL INSPECTION. <br />38. NO ROOFTOP EQUIPMENT SHALL BE VISIBLE FROM THE GROUND. <br />39. A 4'-0" WALKWAY WILL BE MAINTAINED ALONG THE SIDE WALK IN <br />FRONT OF THE BUILDING SITE DURING CONSTRUCTION. <br />40. PEDESTRIAN PROTECTION, FENCES, RAILING OR CANOPIES, SHALL <br />BE ALONG THE PUBLIC RIGHT OF WAY IN ACCORDANCE WITH C.B.C. <br />41. A CONSTRUCTION FENCE SHALL BE MAINTAINED ALONG THE SIDE <br />WALK IN FRONT OF THE BUILDING SITE DURING CONSTRUCTION. THIS <br />FENCE SHALL BE INSTALLED PRIOR TO EXCAVATION AND/OR <br />FOUNDATION TRENCHING. <br />42. TEMPORARY TOILET FACILITIES SHALL BE ON SITE DURING THE <br />CONSTRUCTION AND WILL BE AVAILABLE ALL DURING CONSTRUCTION <br />TIMES. <br />STRUCTURAL ENGINEER <br />BENJAMIN NOROUZI ASSOC. AIA, NCARB <br />GENERAL CONTRACTOR B <br />EMAIL: INFO@BNDESIGNBUILDINC.COM <br />PHONE: (909) 257-7040 <br />OWNER <br />W BISHOP ST W BISHOP ST <br />S <br />R <br />O <br />S <br />S <br /> <br />S <br />T <br />S <br />P <br />A <br />R <br />T <br />O <br />N <br /> <br />S <br />T <br />RICHLAND ST RICHLAND STS <br />V <br />A <br />N <br /> <br />N <br />E <br />S <br />S <br /> <br />S <br />T <br />MOHAMMAD JALALPOUR <br />EMAIL: INFO@BNDESIGNBUILDINC.COM <br />PHONE: (909) 257-7040 <br />S0.01 CONSTRUCTION NOTES <br />S0.02 CONSTRUCTION NOTES <br />S1.01 TYPICAL FOUNDATION DETAILS <br />S1.21 TYPICAL WOOD DETAILS <br />S1.22 TYPICAL WOOD DETAILS <br />S1.23 TYPICAL WOOD DETAILS <br />S1.24 TYPICAL WOOD DETAILS <br />S1.25 TYPICAL WOOD DETAILS <br />S1.26 TYPICAL WOOD DETAILS <br />S2.01 FOUNDATION PLAN <br />S2.11 CEILING PLAN <br />S2.22 ROOF PLAN <br />S4.01 SPECIFIC DETAILS <br />NOTE: <br />MINIMUM 2.07 KWDC PHOTOVOLTAIC SYSTEM WILL BE <br />SUBMITTED UNDER A SEPARATE PERMIT AND SHALL BE <br />ISSUED PRIOR TO BUILDING FRAME INSPECTION REQUEST. <br />• <br />THE SCOPE WILL CONSIST OF THE FOLLOWING: <br />NEW DETACHED ADU 730 SF WITH (3) BEDROOMS, <br />(2) BATHROOMS, A LAUNDRY CLOSET, A COMBINED LIVING <br />AND KITCHEN AREA, AND A COVERED ENTRY <br />REV DATE REMARKS <br />1 10.03.2024 City Correction <br />2 06.25.2025 City Correction <br />AREA DESCRIPTION EXISTING DEMOLISHED PROPOSED NET <br />(E) MAIN UNIT 1,251 SF -- -- 1,251 SF <br />(E) FRONT PORCH 80 SF -- -- 80 SF <br />(E) GARAGE 220 SF -- -- 220 SF <br />NEW ADU UNIT 730 SF 730 SF <br />(ADU + COVERED ENTRY) <br />____________________________________________________________________ <br />TOTAL BUILDING 1,551 SF 2,281 SF <br />FOOTPRINT <br />LOT COVERAGE: 1,251 + 80 + 220 + 730 / 7,004 = 0.32% <br /> REQUIREMENT PROVIDED <br />MINIMUM SIDE YARD SETBACK 4 FEET 25'-3" - 5'-0" FEET <br />MINIMUM REAR YARD SETBACK 4 FEET 5'-0" FEET <br />WALL SEPARATION 5 FEET 15'-0" - 15'-9" FEET <br />OPEN SPACE FOR ADUS 1,200 SQ.FT. 1,600 SQ.FT. <br />ADU / SFD = 730 ADU sf / 1,251 (MAIN UNIT) = 58 % <br />THE ADU SF / SFD SF RATIO IS FOR PARK & REC FEE PURPOSE ONLY. THE <br />APPLICANT IS RESPONSIBLE FOR THE GIVEN “SFR SF” OF THE EXISTING <br />PRIMARY RESIDENCE; BUILDING SAFETY STAFF ARE NOT RESPONSIBLE FOR <br />THE ACCURACY OF THE GIVEN “SFR SF”. <br /> <br />BUILDING DEPARTMENT: CITY OF SANTA ANA <br /> <br />2022 CALIFORNIA BUILDING CODE; <br />• 2022 CALIFORNIA RESIDENTIAL CODE; <br />• 2022 CALIFORNIA MECHANICAL CODE; <br />• 2022 CALIFORNIA PLUMBING CODE; <br />• 2022 CALIFORNIA ELECTRICAL CODE; <br />• 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE; <br />• 2022 CALIFORNIA FIRE CODE; <br />• 2022 BUILDING ENERGY EFFICIENCY STANDARDS <br />• 2022 INTERNATIONAL PROPERTY MAINTENANCE CODE; AND <br />• SANTA ANA MUNICIPAL CODE <br />OWNER NAME: TETSUYA TAKEUCHI <br />GENERAL PLAN: LOW DENSITY RESIDENTIAL <br />STRUCTURE TYPE: SINGLE FAMILY HOME <br />APN: 01016309 <br />ZONE: SD40 (SPECIFIC DEVELOPMENT) <br />GENERAL PLAN DISTRICT: LR 7.0 <br />OCCUPANCY CLASSIFICATION: R-3 / U <br />TYPE OF CONSTRUCTION: TYPE V-B <br />TOTAL OF #UNIT: 1 <br />NUMBER OF STORIES: 1 <br />BUILT IN : 1922 <br />LOT SIZE: 7,004 SQ. FT. <br />FLOOR SIZE: 1,251 SQ. FT. <br />FLOOD ZONE, HIGH FIRE: NONE <br />GRADING: NONE <br />PARKING: NOT REQUIRED, ADU WITHIN 0.5 MILES <br /> OF PUBLIC TRANSIT <br />FIRE SPRINKLERS: N/A (EXISTING PRIMARY HOME IS NOT <br /> EQUIPPED WITH FIRE SPRINKLERS) <br />PHOTOVOLTAIC SYSTEM: TO BE FILED AS A DEFERRED <br /> SUBMITTAL - SEE CF1R <br />OCCUPANCY LOAD: HABITABLE AREA 730 SQFT <br /> (INCLUDING BATHROOM) <br />2 <br />2