Loading...
HomeMy WebLinkAboutFLOOD ZONE-1126 & 1128 N Elaine Dr - PlanA0 TITLE SHEET NE W D E T A C H E D A D U 11 2 8 E L A I N E D R ( A D U ) , SA N T A A N A , C A 9 2 7 0 3 Job # Sheet No.: Scale Date Pr o j e c t f o r : SEAL: SHEET DESCRIPTION : 10/14/25 24212 OW N E R : EN G I N E E R : DI E M L E & T A O P H A M 11 2 6 E L A I N E D R , SA N T A A N A , C A 9 2 7 0 3 71 4 - 6 0 0 - 7 7 8 1 CODE / AGENCIES CONFORMANCES: SHEET INDEX: PROJECT TEAM: VICINITY MAP: (NOT TO SCALE) OWNER: DIEM LE & TAO PHAM 1126 ELAINE DR, SANTA ANA, CA 92703 714-600-7781 PROJECT SITE ALL CONSTRUCTION SHALL CONFORM TO ALL GOVERNING LAWS, CODES AND ORDINANCES INCLUDING BUT NOT LIMITED TO THE FOLLOWING: -2022 California Building Code -2022 California Residential Code -2022 California Electrical Code -2022 California Mechanical Code -2022 California Plumbing Code -2022 California Energy Code -2022 California Fire Code -2022 California Green Building Standards Code PROJECT INFORMATION: PROJECT STATISTIC: SCOPE OF WORK: ABBREVIATIONS: A.C.ANCHOR BOLT A.F.F.ARCHITECTURAL B.L.BUILDING LINE B/BM BOTTOM OF BEAM B/F BOTTOM OF FOOTING BLDG.BUILDING BM.BEAM BRG.BEARING C.J.CEILING JOIST CLR.CLEAR CMU CONCRETE MASONRY UNIT CONC.CONCRETE CONNX.CONNECTION CONST.CONSTRUCTION CONT.CONTINUOUS CONTR.CONTRACTOR D.L.DEAD LOAD DET.DETAIL DIA.DIAMETER DWG.DRAWING DWL.DOWEL E.E.EACH END E.E.EACH FACE E.W.EACH WAY E.J.EACH EXPANSION JOINT EQ.EQUAL E.EXISTING EXP.EXPANSION EXPAN.EXPANSION F.D.FLOOR DRAIN FIN.FINISH F.S.FAR SIDE FDN.FOUNDATION FTG.FOOTING FT.FOOT OR FEET GA.GAGE GALV.GALVANIZED GRAN.GRANUIAR GYP.GYPSUM BOARD H.HORIZONTAL HK.HOOK HORIZ.HORIZONTAL INSF INSIDE FACE IN.INCH INSUL.INSULATION J/B JOIST BEARING JST.JOIST JT.JOINT LB./LBS POUND/POUNDS L.L.LIVE LOAD LLH LONG LEG HORIZ. LLV LONG LEG VERTICAL LT. WT.LIGHT WEIGHT M.O.MASONRY OPENING MAT'L.MATERIAL MAX.MAXIMUM MIN.MINIMUM MISC.MISCELLANEOUS N.NEW/PROPOSED N.I.C.NOT IN CONTRACT N.T.S.NOT TO SCALE NO.NUMBER O.C.ON CENTER O.D.OVERFLOW DRAIN OSF OUTSIDE FACE OPP.OPPOSITE P.E.M.B PRE ENGINEERED METAL BUILDING P.C.PRECAST CONCRETE PL PLATE PSF POUNDS/SQUARE FT. R.D.ROOF DRAIN REINF.REINFORCED REQ'D.REQUIRED REV.REVISION/REVISED SHT.SHEET SIM.SIMILAR SPA.SPACES/SPACING SPECS SPECIFICATIONS STL STEEL STD STANDARD T&B TOP AND BOTTOM T/B TOP OF BEAM OR TRUSS BEARING T/F TOP OF FOOTING TEMP.TEMPORARY/TEMPERATURE TYP.TYPICAL U.N.O.UNLESS NOTED OTHERWISE UNI.UNISEX BATHROOM V.I.F.VERIFY IN FIELD VERT.VERTICAL W.W.R.WELDED WIRE REINFORCED W/WITH WH WATER HEATER W.I.C.WALK-IN CLOSET DW DISH WASHER DM DIMMABLE LIGHT SWITCH EA.EACH SF.SQUARE FEET W/D WASHER & DRYER DBL.DOUBLE R.R.ROOF RAFTER SW SLIDE WINDOW SH SHEET ARCHITECTURAL A0 TITLE SHEET A1 SITE PLAN A2 DEMOLITION FLOOR PLAN & EXISTING ROOF PLAN - MH A3 PROPOSED FLOOR PLAN & ROOF PLAN - ADU A4 PROPOSED ELEVATION, SECTION - ADU A5 EXISTING ELEVATION - MAIN HOUSE E1 PROPOSED UTILITY PLAN - ADU AD1 ARCHITECTURAL DETAILS N1 CAL-GREEN REQUIREMENTS N2 CAL-GREEN REQUIREMENTS STRUCTURAL S0 STRUCTURAL NOTES S1 STRUCTURAL PLANS SD1 FOUNDATION DETAILS SD2 FRAMING DETAILS TITLE 24 T24-1 TITLE 24 T24-2 TITLE 24 (CONT. ) THE PROJECT SCOPE CONSISTS OF - NEW DETACHED ADU 1,000 SQ.FT.: KITCHEN, LIVING, 3 BEDROOMS, 2 BATHROOMS. NEW PORCH 21 SQ.FT. - DEMOLISHED EXISTING PATIO COVER 270 SQ.FT. PROJECT ADDRESS: 1128 Elaine Dr (ADU), Santa Ana, CA 92703 ASSESSOR'S PARCEL NO.:198-022-03 ZONING:R1 OCCUPANCY GROUP:R3 TYPE OF CONSTRUCTION:VB NUMBER OF STORIES:ONE FIRE SPRINKLER:NO FLOOD ZONE: A PREPARED: LT DESIGNS Onetrang10@gmail.com 714-213-1608 0.5 MILE FROM THE ADU TO THE NEAREST PUBLIC TRANSIT STOP ID: 6419 GENERAL NOTES: MAIN HOUSE FLOOR AREA: EXISTING LIVING:1,166 SQ.FT. EXISTING PORCH:40 SQ.FT. EXISTING PATIO COVER:60 SQ.FT. EXISTING GARAGE:388 SQ.FT. 1,654 SQ.FT. ADU FLOOR AREA: NEW DETACHED ADU:1,000 SQ.FT. NEW PORCH:21 SQ.FT. 1,021 SQ.FT. LOT SIZE:7,272 SQ.FT. LOT COVERAGE: 1,594 / 7,272 = 21.9% ( WITHOUT ADU) LOT COVERAGE: (1,594 + 1,021) / 7,272 = 35.96% ( WITH ADU) ADU / MAIN HOUSE: (1,000)/(1,166) = 85.8 % - LOT COVERAGE SHALL EXCLUDE PATIO COVER (CITY OF SANTA ANA ZONING ORDINANCE (SEC. 41-105) 1.Contractor shall verify all dimensions on site prior to start construction and notify the engineer of any discrepancies. 2.Prior to framing, framing contractor shall verify rough-in dimensions required for bath tubs, showers stalls, fireplaces, window heights, door locations, etc. 3.Provide approved plan box. Provide temporary sanitary facilities. 4.On site verification of all dimensions and conditions shall be the responsibility of each contractor. Noted dimensions take precedent over scale. 5.All work shall be performed by licensed contractors. 6.Shall be notified immediately by contractor or sub-contractor should any discrepancy or other question arise pertaining to the working drawings and/or specifications. The contractor shall be held responsible for the results of any errors, discrepancies, or omissions which the contractor failed to notify the architect or engineer of before construction and / or fabrication of the work. 7.All proposed utilities will be underground. Pursuant to Section 41-626 of the Santa Ana Municipal Code (SAMC), all utilities for new buildings, additions, and change of service must be underground. 8.Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection 9.The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf” of the existing residence. 10.A Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying. The completed ELEVATION CERTIFICATE must be submitted to the Building Inspector at the time of foundation inspection, and a FINAL CERTIFICATE must be submitted at the time of final inspection. 11. Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection. 1. SOLAR PLANS TO BE PULLED BY SEPARATE PERMIT-SIZE OF SOLAR PV SYSTEM SHALL BE 2.39 KWDC TO CONFORM WITH T-24 SPECIAL FEATURE REQUIREMENT. DEFERRED SUBMITTAL: PL 68.60' PL 68.60' PL 1 0 6 ' PL 1 0 6 ' ELAINE DRCL (E ) C L O S E T (E) KITCHEN (E) DINING (E) 2 CAR GARAGE (E) LIVING (E) CLOSET (E) BED #3 (E ) C L O S E T (E ) C L O S E T (E) BED #2 CAST IRONSINKSBROOKFIELDK-5942-5 (E) BA #2 CAST IRONBATHDYNAMETRICK-519 (E ) C L O S E T (E) BED #1 CAST IRONSINKSBROOKFIELDK-5942-5 (E ) B A # 1 W/D (E) COVERED PATIO (E) PORCH (E) ELECT. PANEL (E) GAS METER (E) LANDSCAPE (E) DRIVEWAY (E) LANDSCAPE (E) LANDSCAPE (E ) L A N D S C A P E (E) UTILITY POLE (E) HALLWAY 22'-9"18'-3"17'-11" 22 ' - 1 " 4'-10" 34 ' - 1 1 " 31 ' - 6 " 5' 5' EA S E M E N T (E) 6" BLOCK WALL 6' HIGH (E) 6" BLOCK WALL 6' HIGH (E) UTILITY POLE 4'-10" 17'-7"4'-10" 5' - 6 " 15'-11" 5' - 5 " 25'-5" 11'-9" 4'-7" 39 ' - 7 " (E) IRON FENCE 6' HIGH 17 ' 3' (E) WATER METER 5' - 8 " 6'-10" (E) MAIN HOUSE 1126 N ELAINE DR 20 ' - 5 " 6' - 6 " 6'14'-11"6' - 6 " 18 ' - 1 " 15 ' 15 ' 14'-11" CAST IRONSINKSBROOKFIELDK-5942-5 IS L A N D (N) KITCHEN STACK W/D CLOSET CLOSET CAST IRONSINKSBROOKFIELDK-5942-5 CAST IRONSINKSBROOKFIELDK-5942-5 (N) LIVING W.I.C. 22'-6" 25'-2"6' 23 ' - 7 " 47'-8" DETACHED ADU 1,000 S.F. 1128 N ELAINE DR (N) BED #1 (N) BED #2 (N) BED #3 (N) ELECTRIC METER 200AMP - ADU MINIMUM 20 FEET UFER WITH 1/4" INCH REBARS AND #4 AWG BARE COPPER CONDUCTOR, WITH MINIMUM 225 AMP BUSBAR WITH MINIMUM 4 BRANCH CIRCUITS. (N) HEAT PUMP CONDENSER- ADU WH HP (E) WATER LINE (N) WATER LINE FOR ADU CONNECT TO EXISTING SEWER LATERAL SERVING MAIN HOUSE (E) SEWER LATERAL - MAIN HOUSE (N) MIN. 4'' SEWER LATERAL AND MIN 2% SLOPE FOR DRAINAGE - ADU 5%5% 5%5% 5% 5% 5%5%5% 5% 5% 2% 2% 2% 2% 2% 2%2% 2%2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%2% 2% 2%2%2%2% 2% LA N D I N G (N) BA #1 (N) BA #2 7' 3' 5' 4'-6" 3' 10 AD1 11 AD1 10 AD1 3' 3' (N ) P O R C H PL 68.60' PL 68.60' PL 1 0 6 ' PL 1 0 6 ' ELAINE DRCL (E ) C L O S E T (E) KITCHEN (E) DINING (E) 2 CAR GARAGE (E) LIVING (E) CLOSET (E) BED #3 (E ) C L O S E T (E ) C L O S E T (E) BED #2 CAST IRONSINKSBROOKFIELDK-5942-5 (E) BA #2 CAST IRONBATHDYNAMETRICK-519 (E ) C L O S E T (E) BED #1 CAST IRONSINKSBROOKFIELDK-5942-5 (E ) B A # 1 W/D (E) COVERED PATIO (E) PATIO COVER TO BE REMOVED (E) PORCH (E) ELECT. PANEL (E) GAS METER (E) LANDSCAPE (E) DRIVEWAY (E) LANDSCAPE (E) LANDSCAPE (E ) L A N D S C A P E (E) UTILITY POLE (E) HALLWAY 22'-9"18'-3"17'-11" 22 ' - 1 " 4'-10" 34 ' - 1 1 " 31 ' - 6 " 5' 5' EA S E M E N T (E) 6" BLOCK WALL 6' HIGH (E) 6" BLOCK WALL 6' HIGH (E) UTILITY POLE 4'-10" 17'-7"4'-10" 5' - 6 " 15'-11" 5' - 5 " 25'-5" 11'-9" 4'-7" 16'-11" 10 ' - 1 0 " 16 ' - 4 " 39 ' - 7 " (E) IRON FENCE 6' HIGH 17 ' 3' (E) WATER METER 5' - 8 " 6'-10" (E) MAIN HOUSE 1126 N ELAINE DR (7) 24" - BOX CANOPY TREE (3) - 5 GAL TREE (4) - ONE GAL TREE SITE LEGEND: GRASS (N) CONC. WALKWAY A1 SITE PLAN NE W D E T A C H E D A D U 11 2 8 E L A I N E D R ( A D U ) , SA N T A A N A , C A 9 2 7 0 3 Job # Sheet No.: Scale Date Pr o j e c t f o r : SEAL: SHEET DESCRIPTION : 10/14/25 24212 OW N E R : EN G I N E E R : DI E M L E & T A O P H A M 11 2 6 E L A I N E D R , SA N T A A N A , C A 9 2 7 0 3 71 4 - 6 0 0 - 7 7 8 1 EXISTING SITE PLAN (SCALE: 1/8"=1'-0")PROPOSED SITE PLAN (SCALE: 1/8"=1'-0") (E ) C L O S E T (E) KITCHEN SLOPED CEILING (E) DINING VAULTED CLG (E) 2 CAR GARAGE (E) 8068 SL.DR. (E) LIVING VAULTED CLG (E) CLOSET (E) BED #3 VAULTED CLG (E ) C L O S E T (E ) C L O S E T (E) BED #2 VAULTED CLG CAST IRONSINKSBROOKFIELDK-5942-5 (E) BA #2 8'-0'' CLG CAST IRONBATHDYNAMETRICK-519 (E ) C L O S E T (E) BED #1 VAULTED CLG CAST IRONSINKSBROOKFIELDK-5942-5 (E ) B A # 1 VA U L T E D C L G W/D (E) W/H (E) 16' X 7' GARAGE DOOR (E ) 3 0 2 0 C S (E) 6020 CS(E) 6020 CS (E) 2630 SH (E ) 6 0 2 0 C S (E ) 2 0 3 0 S H (E ) 6 0 2 0 C S (E) 6020 CS (E) 2030 CS (E) 6040 CS (E) COVERED PATIO (E) PATIO COVER TO BE REMOVED 270 SQ.FT. (E) PORCH (E) HALLWAY 8'-0'' CLG 21 ' - 3 " 17'-1" 11'-7"6'-0" 17'-7" 5' - 6 " 15'-11" 5' - 5 " 7'-6"17'-11" 25'-5" 22 ' - 1 " 17'-11" 3' - 9 " 11'-0"4'-6"2'-9" 18'-3" 5' - 8 " 9'-7"3'-2"10'-0" 22'-9" 12 ' - 1 " 7' - 5 " 15 ' - 5 " 34 ' - 1 1 " 11'-9" 16'-11" 10 ' - 1 0 " 16 ' - 4 " (E) 2630 SH 5' - 8 " 6'-10" LINE OF WALL LEGEND: LINE OF ROOF 2' - 0 " 5' - 3 " 1' - 6 " 1' - 6 " 2' - 0 " (E) ASPHALT SHINGLES ROOFING 2: 1 2 2: 1 2 2: 1 2 2: 1 2 2: 1 2 2: 1 2 2: 1 2 2: 1 2 8" 8" 2' - 0 " 7' - 5 " A2 DEMOLITION FLOOR PLAN EXISTING ROOF PLAN - MAIN HOUSE NE W D E T A C H E D A D U 11 2 8 E L A I N E D R ( A D U ) , SA N T A A N A , C A 9 2 7 0 3 Job # Sheet No.: Scale Date Pr o j e c t f o r : SEAL: SHEET DESCRIPTION : 10/14/25 24212 OW N E R : EN G I N E E R : DI E M L E & T A O P H A M 11 2 6 E L A I N E D R , SA N T A A N A , C A 9 2 7 0 3 71 4 - 6 0 0 - 7 7 8 1 SCALE: DEMOLITION FLOOR PLAN - MAIN HOUSE (E) WALLS TO BE REMAIN LEGEND: (E) WALLS TO BE REMOVED PROPOSED NEW 2X4 WALLS PROPOSED 1HR FIRED WALLS (E) DOORS TO BE REMOVED (E) WINDOWS TO BE REMOVED PROPOSED NEW 2X6 WALLS SCALE: EXISTING ROOF PLAN - MAIN HOUSE (NO CHANGE) CITY OF SANTA ANA anning ald Building Agepcy 4'-6" 0o rA15r�� 47'-8" `DIMIN (N) HEA I PUMP/ CONDENSER-ADU BATHROOM HAS GRAB BAR REINFORCEMENT. SEE SHEET E1 FOR AGING -IN -PLACE DESIGN AND FALL PREVENTION REQUIREMENTS PROPOSED FLOOR PLAN - ADU SCALE: 1 /4" = 1 ' - 0" PROPOSED ROOF PLAN - ADU SCALE: 1 /4" = 1'-0" A MINN k 2 DOOR & WINDOW SCHEDULE - ADU O MARK W H SILL HGHT QUANTITYREMARK , / MATERIAL A 3'-0" 6'-8" 0 1 EXTERIOR SOLID WOOD D B 2'-6" 6-8" 0 3 INTERIOR HOLLOW WOOD O O C 2'-10" 6'-8" 0 2 INTERIOR HOLLOW WOOD R D 2'-6" 6'-8" 0 1 POCKET DOOR E 2'-6" 6'-8" 0 1 DOOR TO BE LOUVERED 1 5' 4' 2'-8" 5 SLIDING VINYL FRAME W 1 2 4' 3' T-8" 1 SLIDING VINYL FRAME N D 3 2'-6" 5' 1'-8" 2 SINGLE HUNG O W 4 4' 2' 4'-8" 1 SL. VINYL FRAME (TEMP.) 5 2' 4' 2'-8" 1 SINGLE HUNG (TEMP.) * ALL (N)WINDOW U-FACTOR = 0.30 & SHGC = 0.23 LEGEND: LINE OF WALL LINE OF ROOF EXISTING ROOF NEW ROOF ATTIC VENTILATION - ADU: Required net area: 1/300 (406x144) = 194.88 Sq.ln. Proposed net area: Exhaust (high) vent area required: 97.44 Sq.ln. (1) 100 Sq.ln. NFA - Construction Metals Inc 12"x24". Alum. Roof Vent: 100 Sq.ln. Intake (low) vent area required: 97.44 Sq.ln. (1) 100 Sq.ln. NFA - Construction Metals Inc 12"x24". Alum. Roof Vent: 100 Sq.ln. Total proposed net area: 200 Sq.ln. ATTIC VENTILATION - ADU: Required net area: 1/300 (594x144) = 285.12 Sq.ln. Proposed net area: Exhaust (high) vent area required: 142.56 Sq.ln. (2) 100 Sq.ln. NFA - Construction Metals Inc 12"x24". Alum. Roof Vent: 200 Sq.ln. Intake (low) vent area required: 142.56 Sq.ln. (2) 100 Sq.ln. NFA - Construction Metals Inc 12"x24". Alum. Roof Vent: 200 Sq.ln. Total proposed net area: 400 Sq.ln. LEGEND: (E) WALLS TO BE REMAIN (E) WALLS TO BE REMOVED (E) DOORS TO BE REMOVED (E) WINDOWS TO BE REMOVED PROPOSED NEW 2X4 WALLS PROPOSED NEW 2X6 WALLS PROPOSED 1HR FIRED WALLS FLOOR PLAN KEY NOTES: IXI 1. Shower and walls above bathtubs with shower heads shall be finished with a smooth, nonabsorbent surface to a height not less than 72 inch above the drain inlet. [§1210.2.3 CBC] (R307.2 CRC). - Shower pan shall have a minimum area of 1024 sq. inches and a minimum finish dimension of 30 inches in any directions. Shower doors shall open so as to maintain not less than a 22" unobstructed opening for egress. (CPC 408.6) FF - Showers and shower -tubs shall be provided with individual control valves of the pressure balar ceO thermostatic, or combination pressure balance/thermostatic mixing valve type that provide 3cald and thermal shock protection. [§408.3 CPC] 2. [§2406.3 CBC] Safety glazing in the following locations: 1p roved ER IT ISSUAN E • Where the nearest edge of glazing is within a 24-inch are of either side of a door in a losed position (unless there is an intervening wall between the door and the glazing or if the glazing is 5 feet or higher above the walking surface). Master I D : • Glazing greater than 9 square feet with the bottom edge less than 18 inches above the floor and the top edge greater than 36 inches above the floor (unless the glazing is more t nMate: inches horizontally away from walking surfaces or if a complying protective bar is inst II • Glazing in shower and tub enclosures (less than 60 inches above standing surface) • Glazing in swinging and sliding doors. • Glazing adjacent to stairways, landings and ramps within 36 inches horizontally of a walking surface when the glazing is less than 60 inches above the plane of the adjacent walking surface. • Glazing less than 5 feet horizontally from swimming pools and less than 5 feet above adjoining grade 3. Provide an exhaust fan in the bathroom of 4 air changes per hour minimum with humidity control sensor. [§1203.5.2.1 CBC] (R303.3.1 CRC) 4. Bedroom emergency egress: Each bedroom shall have a door directly to the exterior or a window that will provide a clear space opening of at least 5.7 square feet in the open position (5 sq. ft. at grade floor openings), and a minimum clear opening width of 20 inches and clear opening height of 24 inches and a maximum sill height of 44 inches above the floor. [§1030 CBC] (R310 CRC) 5. Room natural ventilation requirement. Provide exterior opening with an area equal to 4 percent of the floor area. [§1203.5 CBC] (R303.1 CRC) 6. At least one egress door shall be provided for each dwelling unit that has a minimum clear width of 32 inches between the face of the door and the stop with the door opened 90°, and a minimum clear height of 78 inches measured from the top of the threshold to the bottom of the stop. (R311.2 CRC) 7. A landing, with a width not less than the width of door and length in the direction of travel of not less than 36 inches, will be provided on each side of doors. The slope at exterior landings shall not exceed '/4" in vertical in 12" in horizontal, 2%. The elevation of landing shall not exceed 1'/2 inch difference than the threshold of the doorway (7 3/4 inch if door does not swing over the landing or steps). [CRC R311.3] 8. Minimum 1 inch clearance shall be provided between the attic insulation and the roof sheathing where cave or cornice vents are installed. (R806.3 CRC) 9. Dishwasher with drain to garbage disposal. 10. Sink with garbage disposal. 11. Cook top to be selected by owner. Vent to outside with backdraft damper. 12. Toilet and bidet require a minimum 15 inches of clearance from the center line of the bowl to each side, and 24 inches from the front edge of the bowl. Per 2022 [CPC 402.5] 13. The maximum hot water temperature discharging from the bathtub, shower and whirlpool bathtub filler shall be limited to 120 degrees Fahrenheit. The water heater thermostat shall not be considered a control for meeting this provision. CPC 408.3 and 409.4 14. Attic access with a minimum size of 20 inches x 30 inches unless the maximum vertical headroom height in the attic is less than 30 inches. Where mechanical equipment is installed in the attic the minimum dimensions are 30" x 30" and a east as large as the largest component of the appliance. [§1209.2 C13C] [§904.11 CMC] (R.807.1 CRC) 15. F.A.U.: furnace in attic, Combustion air from outside, vent to outside and provide setback / \ thermostat. See detail 4/AD1 16. Washer space, provide cold & hot water supply, waste line and if on second floor, a pan with drain to exterior. 17. Dryer space, provide vent to outside with smooth metal duct with backdraft damper. 18. When a domestic clothes dryer is located in a closet, a minimum opening of 100 sq. in. for makeup air shall be provided in the Door or per the manufacturers written installation instructions. (504.3.2 CMC) 19. A domestic clothes dryer duct shall be of metal and a minimum of 4" in diameter. The exhaust duct shall not exceed a total combined horizontal and vertical length of 14', including two 90 degree elbows. Two feet shall be deducted for each 90 degree elbow in excess of two. (504.4.2.1 & 504.4.2.2 CMC) 20.Hallway widths shall be 36 inches minimum. (R311.6 CRC) 21.The following are required for heat pump water heaters (HPWH): a. The HPWH will be installed according to manufacturer's requirements b. Installation shall be in a conditioned space unless listed for exterior installation. Modeling in T-24 must match. c. Prescriptive installations shall be indoors and on a rigid R-10 insulated surface. HPWH must meet NEEA Tier 3 or higher. [150.2(b)lHiii] AGING-IN-PLACE/FALL PREVENTION NOTES A. Reinforcement for Grab Bars. [R327.1.1] At least one bathroom on the entry level shall be provided with reinforcement installed in accordance with this section. Where there is no bathroom on the entry level, at least one bathroom on the 2nd or 3rd floor of the dwelling shall comply with this section. 1. Reinforcement shall be solid lumber or other construction materials approved by the enforcing agency. 2. Reinforcement shall not be less than 2 by 8 inch nominal lumber (1-1/2" x 7-1/4" actual dimension) or other construction material providing equal height and load capacity. Reinforcement shall be located between 32" and 39-1/4" above the finished floor, flush with the wall framing. 3. Water closet reinforcement shall be installed on both side walls of the fixture, or one side wall and the back wall. 4. Shower reinforcement shall be continuous where wall framing is provided. 5. Bathtub and combination bathtub/shower reinforcement shall be continuous on each end of the bathtub and the back wall. Additionally, back wall reinforcement for a lower grab bar shall be provided with the bottom edge located no more than 6" above the bathtub rim. 6. Where the water closet is not placed adjacent to a side wall capable of accommodating a grab bar, the bathroom shall have provisions for installation of floor -mounted, foldaway or similar alternate grab bar reinforcements approved by the enforcing agency. B. Documentation for Grab Bar Reinforcement. [R327.1.1.1] Information and/or drawings identifying the location of grab bar reinforcement shall be placed in the operation & maintenance manual in accordance with the California Green Building Standards Code, Ch. 4, Division 4.4. C. Electrical Receptacle Outlet, Switch & Control Heights. [R327.1.2] Electrical receptacle outlets, switches and controls (including controls for heating, ventilation and air conditioning) intended to be used by occupants shall be located no more than 48" measured from the top of the outlet box and not less than 15" measured from the bottom of the outlet box above the finish floor. D. Interior Doors. [R327.1.3] Effective July 1, 2024, at least one bathroom and one bedroom on the entry level shall provide a doorway with a net clear opening of not less than 32", measured with the door positioned at an angle of 90 degrees from the closed position; or, in the case of a 2- or 3-story single family dwelling, on the 2nd or 3rd floor of the dwelling if a bathroom or bedroom is not located on the entry level. E. Doorbell Buttons. [R327.1.4] Doorbell buttons or controls, when installed, shall not exceed 48" above exterior floor or landing, measured from the top of the doorbell button assembly. Where doorbell buttons integrated with other features are required to be installed above 48" measured from the exterior floor or landing, a standard doorbell button or control shall also be provided at a height not exceeding 48" above exterior floor or landing, measured from the top of the doorbell button or control. 0C)U Q � ~zQ00 asil­qz� LJ :5 Q p J LU Q (=) � w 1­4 T- 4 Q � p 0 � �. � Q 0 w U Q H w 0 w Z i O U N O CL SEAL: . M O Q [V Q U W zQ SHEET DESCRIPTION: PROPOSED FLOOR PLAN, ROOF PLAN - ADU Date 1 10/21 /25 Job # 24212 Scale Sheet No.: A3 SCALE: ADU - REAR ELEVATION (SOUTH) SCALE: ADU - RIGHT ELEVATION (WEST) SCALE: ADU - LEFT ELEVATION (EAST) SCALE: ADU - FRONT ELEVATION (NORTH) 8" 9' - 0 " 4' - 9 " 14 ' - 5 " T.O.PL T.O.SLAB 8" 9' - 0 " 3' - 1 0 " 14 ' - 5 " T.O.PL T.O.SLAB 8" 9' - 0 " 4' - 9 " 14 ' - 5 " T.O.PL T.O.SLAB 8" 9' - 0 " 4' - 9 " 14 ' - 5 " T.O.PL T.O.SLAB (N) CONDENSER (N) CONDENSER 2' - 8 " (N) 4' - 0 " 2' - 8 " (N) 4' - 0 " 2' - 8 " (N) 4' - 0 " 2' - 8 " (N) 4' - 0 " 2' - 8 " (N) 4' - 0 " (N) 4' - 8 " 2' - 0 " 3' - 8 " (N) 3' - 0 " (N) 1' - 8 " (N) 5' - 0 " (N) 1' - 8 " 5' - 0 " (N) 2' - 8 " (N) 4' - 0 " 12 4 (N) ASPHALT SHINGLES ROOFING ICC/ES-ESR1389 COLOR TO MATCH EXISTING (N) ELECT. METER 11 " (N) STUCCO TO MATCH EXISTING COLOR (N) STUCCO TO MATCH EXISTING COLOR (N) STUCCO TO MATCH EXISTING COLOR (N) STUCCO TO MATCH EXISTING COLOR (N) STUCCO TO MATCH EXISTING COLOR (N) STUCCO TO MATCH EXISTING COLOR (N) ASPHALT SHINGLES ROOFING ICC/ES-ESR1389 COLOR TO MATCH EXISTING (N) ASPHALT SHINGLES ROOFING ICC/ES-ESR1389 COLOR TO MATCH EXISTING (N) ASPHALT SHINGLES ROOFING ICC/ES-ESR1389 COLOR TO MATCH EXISTING 12 4 8" 9' - 0 " 4' - 9 " 14 ' - 5 " T.O.PL T.O.SLAB 8" 9' - 0 " 3' - 1 0 " 14 ' - 5 " T.O.PL T.O.SLAB 12 4 (N) ASPHALT SHINGLES ROOFING ICC/ES-ESR1389 COLOR TO MATCH EXISTING 11 " (N) ASPHALT SHINGLES ROOFING ICC/ES-ESR1389 COLOR TO MATCH EXISTING (N) FOOTING (N) FOOTING (N) CONCRETE SLAB SCALE: SECTION 1 - 1 SCALE: SECTION 2 - 2 (N) FOOTING (N) FOOTING (N) CONCRETE SLAB (N) CONCRETE SLAB R-15 R-30 (N) KITCHEN(N) LIVINGR-15 R-30 R-30 R-15 R-15 CLOSET CLOSET (N) LIVING(N) BED #1 (N) BED #2 (N) BED #3 A4 ELEVATION, SECTION - ADU NE W D E T A C H E D A D U 11 2 8 E L A I N E D R ( A D U ) , SA N T A A N A , C A 9 2 7 0 3 Job # Sheet No.: Scale Date Pr o j e c t f o r : SEAL: SHEET DESCRIPTION : 10/14/25 24212 OW N E R : EN G I N E E R : DI E M L E & T A O P H A M 11 2 6 E L A I N E D R , SA N T A A N A , C A 9 2 7 0 3 71 4 - 6 0 0 - 7 7 8 1 SCALE: MAIN HOUSE - LEFT ELEVATION (SOUTH) SCALE: MAIN HOUSE - REAR ELEVATION (WEST) SCALE: MAIN HOUSE - FRONT ELEVATION (EAST) SCALE: MAIN HOUSE - RIGHT ELEVATION (NORTH) 8" 8' - 0 " 3' - 3 " 11 ' - 1 1 " T.O.PL T.O.SLAB 8" 8' - 0 " 3' - 3 " 11 ' - 1 1 " T.O.PL T.O.SLAB 8" 8' - 0 " 3' - 3 " 11 ' - 1 1 " T.O.PL T.O.SLAB 8" 8' - 0 " 3' - 3 " 11 ' - 1 1 " T.O.PL T.O.SLAB (E) (E)(E) (E) (E)(E) (E) (E) (E) (E)(E) (E)(E)(E) (E) (E) STUCCO (E) SIDING (E) STUCCO (E) STUCCO (E) STUCCO (E) STUCCO (E) STUCCO (E) STUCCO (E) STUCCO (E) STUCCO (E) ASPHALT SHINGLES ROOFING (E) ELECT. PANEL (E) GAS METER 12 2 12 2 (E) ASPHALT SHINGLES ROOFING 12 2 (E) ASPHALT SHINGLES ROOFING (E) ASPHALT SHINGLES ROOFING A5 ELEVATION - MAIN HOUSE NE W D E T A C H E D A D U 11 2 8 E L A I N E D R ( A D U ) , SA N T A A N A , C A 9 2 7 0 3 Job # Sheet No.: Scale Date Pr o j e c t f o r : SEAL: SHEET DESCRIPTION : 10/14/25 24212 OW N E R : EN G I N E E R : DI E M L E & T A O P H A M 11 2 6 E L A I N E D R , SA N T A A N A , C A 9 2 7 0 3 71 4 - 6 0 0 - 7 7 8 1 1 SHEAR TRANSFER @ ATTIC2 3EXTERIOR WALL WATER PROOFING 4 5 6 10 11 ROOF DIAPHRAGM DIAPHRAGM BOUNDARY NAIL SHEAR PANEL THROUGH ROOF ROOF RAFTER CEILING JOIST SHEAR PANEL EDGE NAIL 2 4 1 3 2 INSTALLATION ORDER: 1.SILL FLASHING 2.JAMB FLASHING 3.WINDOW 5.HEAD FLASHING OVER FIN 6.FELT PAPER 5 4'0" MAX. JOIST HGRS AS SHOWN DBL JOIST EA SIDE OF OPENING OPNG AS JOISTS OR RAFTERS HEADER SAME SIZE AND GRADE ROOF OR FLOOR OPENING 12 8 9 DOOR FLASHING WINDOW FLASHING1314STUCCO WEEP SCREED ATTACH A (MIN. 12" WIDE) SILL STRIP OF FLASHING MATERIAL WITH THE TOP EDGE EVEN WITH THE TOP EDGE OF THE ROUGH SILL. EXTEND SILL STRIP MINIMUM 14" BEYOND THE EDGE OF THE ROUGH OPENING FOR WINDOW. ATTACH FLASHING WITH GALVANIZED ROOFING NAILS OR RUST-RESISTANT STAPLES. ROUGH OPENIN G AFTER SILL 51RIP 15 IN PLACE, ATTACH (MIN. 12" HIDE) JAMB STRIPS OF FLASHING MATERIAL (SIDE OF OPENING) WITH INSIDE EDGE OF FLASHING FLUSH WITH EDGE OF ROUGH OPENING. START JAMB STRIPS 2" BELOW THE SILL STRIP AND EXTEND JAMB STRIPS 12" ABOVE THE LOWER EDGE OF THE HEADER (TOP OF ROUGH OPENING). APPLY A CONTINUOUS BEAD OF SEALANT TO THE BACK SURFACES OF THE WINDOW FLANGE, THEN PLACE THE WINDOW INTO THE ROUGH OPENING WITH THE FLANGES OVER THE INSTALLED FLASHING STRIPS. AFTER THE WINDOW IS PLACED, APPLY A CONTINUOUS BEAD OF SEALANT O/ HEAD FLANGE, INSTALL A (MIN. 12" WIDE) HEAD STRIP OF FLASHING MATERIAL OVER THE WINDOW FLANGE, EMBED FLASHING MATERIAL INTO SEALANT. ROUGH OPENIN G WATERRESISTA N T PAPER HE A D S T R I P WATERRESIST A N T PAPER JAMB S T R I P STARTING AT THE BOTTOM OF THE WALL (SOLE PLATE), LAY WATER-RESISTANT PAPER (A) UNDER THE SILL STRIP. GUT ANT EXCESS WATER-RESISTANT PAPER THAT MAY EXTEND ABOVE THE SILL FLANGE ON EACH SIDE OF THE OPENING. (SHOWN IN DIAGRAM AS SHORT DASH LINES). INSTALL SUCCEEDING COURSES OF WATER-RESISTANT PAPER (B, C, ETC.) OVER JAMB AND HEAD FLANGES IN SHINGLE-BOARD FASHION. PAPER SHOULD RUN CONTINUOUSLY OVER HEAD WITH NO SPLICES ABOVE WINDOW. NOTES: I.R.C. 703.5 CALLS FOR FLASHING OF ALL EXTERIOR OPENINGS EXPOSED TO THE HEATHER TO MAKE THEM WEATHER PROOF. SINCE C.R.C. DOES NOT OUTLINE PROCEDURES FOR WINDOW FLASHING, TECHNIQUES SHOWN HERE ARE RECOMMENDED. USE APPROVED 12" HIDE SELF-SEALING FLASHING. CAULK BACK OF WINDOW FRAMES BEFORE SETTING. USE WINDOW THAT ARE WATER TIGHT. 26 GA. G.l. FLASHING REQUIRED AS SHOWN IN OTHER WINDOW DETAILS TO BE INSTALLED BY SHEET METAL CONTRACTOR. LINE WIRE, WHEN USED AS BACKING TO SUPPORT HATER-RESISTANT BUILDING PAPER OR FELT BENEATH LATH FOR STUCCO SHOULD BE INSTALLED ACCORDING TO INDUSTRY STANDARDS AND PRACTICE NO ATTACHMENT DEVICE NOR THE WIRE BACKING SHOULD COVER OR PENETRATE FLASHING MATERIAL. PERIPHERAL FLASHING AT ALL EDGES OF WALL OPENINGS MUST COVER WIRE BACKING. WATER - RESISTANT PAPER TO BE 60 MINUTE GRADE 'D' PAPER MINIMUM SILL STRIP WATERRESISTA N T PAPER WATERRESISTA N T PAPER 14" 14" SILL ST R I P 1 2 3 4 SILL ST R I P JA M B S T R I P JA M B S T R I P 12 " 2" 14" SILL ST R I P JA M B S T R I P JA M B S T R I P HEAD S T R I P A B C SILL ST R I P JA M B ST R I P JA M B ST R I P WATERRESIST A N T PAPER WATER R E S I S T A N T PAPER WATER R E S I S T A N T PAPER 3/ 8 " 3/8" JA M B S T R I P 1 HEAD S T R I P JA M B S T R I P 2 G.I.FLAS H I N G HEAD STRIP WATERRESIST A N T PAPER WATERRESIST A N T PAPER A B C JAMB S T R I P 3 4 WATERRESIST A N T PAPER THRESHOLD-PROVIDE BITUMINOUS COATING UNDER THRESHOLD FOR SEPARATION OF ALUMINUM AND CONCRETE, OR OTHER APPROVED MEASURE TO ISOLATE/PROTECT. APPLY SEALANT TO FLOOR AND/OR BOTTOM OF SILL PER MANUFACTURER. PLACE DOOR UNIT INTO ROUGH OPENING AND TEMPORARILY FASTEN PER MANUFACTURER. APPLY SEALANT TO EXTERIOR EDGE OF THE DOOR FRAME JAMBS AND HEAD TO RECEIVE FLASHING SET 3/8" IN FROM THE INSIDE EDGES OF JAMBS AND HEAD. ATTACH JAMB STRIPS OF FLASHING MATERIAL (SIDES OF OPENING) AT LEAST 12" WIDE WITH THE INSIDE EDGE OF FLASHING POSITIONED 3/8" IN FROM THE INSIDE EDGE OF THE DOOR FRAME. JAMB STRIPS SHOULD EXTEND 12" MIN. ABOVE OPENING. ATTACH HEAD STRIP OF FLASHING MATERIAL (TOP OF OPENING) AT LEAST 12" WIDE WITH THE BOTTOM EDGE OF FLASHING POSITIONED 3/8" UP FROM THE BOTTOM EDGE OF THE DOOR HEADER. APPLY A CONTINUOUS BEAD OF SEALANT ON THE EXTERIOR SURFACE OF JAMB AND HEAD FLASHING ON THE DOOR SIDE EDGE OF THE FLASHING. ATTACH BRICK MOULD OVER SEALANT AND ALIGNED WITH JAMB AND HEAD STRIPS OF FLASHING SET 3/8" IN FROM EDGES OF DOOR FRAME. AT BRICK MOULD AT DOOR HEAD, APPLY SEALANT TO TOP OF BRICK MOULD AND AT ADJACENT WALL TO RECEIVE 26 GA. FLASHING (26 GA. G.I. FLASHING NOT REQUIRED WHEN DOOR IS PROTECTED BY 3'-0" MIN. OVERHANG OR SOFFIT). STARTING AT THE BOTTOM OF THE WALL(SOLE PLATE), LAY WATER-RESISTANT PAPER (A) OVER THE JAMB FLASHING STRIP AND LAP INTO THE JAMB BRICK MOULD. INSTALL SUCCEEDING COURSES OF WATER-RESISTANT PAPER (B, C, ETC.) OVER JAMB FLASHING, SHINGLE-BOARD FASHION, AND LAP INTO THE JAMB BRICK MOULD. AT DOOR HEAD PAPER SHOULD RUN CONTINUOUSLY ABOVE THE DOOR WITH NO SPLICES AND ALP OVER 26 GA. G.I. FLASHING. (RUN PAPER ONTO TOP OF BRICK MOULD WHEN G.I. FLASHING IS NOT REQUIRED). NOTES: I.R.G.703.8 CALLS CALLS FOR FLASHING OF ALL EXTERIOR OPENINGS EXPOSED TO THE WEATHER TO MAKE THEM WEATHER PROOF. SINCE C.R.C. DOES NOT OUTLINE PROCEDURES FOR DOOR FLASHING, TECHNIQUES SHOWN HERE ARE RECOMMENDED. USE APPROVED 12" WIDE SELF-SEALING FLASHING. CAULK BACK OF DOOR FRAMES BEFORE SETTING. USE DOORS THAT ARE WATER TIGHT. 26 GA. G.I. FLASHING REQUIRED AS SHOWN IN OTHER DOOR DETAILS TO BE INSTALLED BY SHEET METAL CONTRACTOR. LINE WIRE, WHEN USED AS BACKING TO SUPPORT WATER-RESISTANT BUILDING PAPER OR FELT BENEATH LATH FOR STUCCO SHOULD BE INSTALLED ACCORDING TO INDUSTRY STANDARDS AND PRACTICE NO ATTACHMENT DEVICE NOR THE WIRE BACKING SHOULD COVER OR PENETRATE FLASHING MATERIAL. PERIPHERAL FLASHING AT ALL EDGES OF WALL OPENINGS MUST COVER WIRE BACKING. WATER - RESISTANT PAPER TO BE 60 MINUTE GRADE 'D' PAPER MINIMUM SHEAR PANEL (per plan) 4"MIN. ABOVE EARTH 2"MIN. ABOVE PAVEMENT WEEP SCREED MINIMUM 26 GA. CORROSION - RESISTANT OR PLASTIC WITH A MINIMUM VERTICAL FLANGE OF 3 1/2" SHALL BE PROVIDED AT OR BELOW FOUNDATION PLATE LINE ON EXTERIOR STUD WALLS. 7 EXTERIOR SHEATHING TWO LAYERS OF GRADE D PAPER EXTERIOR LATH STUCCO GYPSUM BOARD INSULATION EXTERIOR WALLFELT UNDERLAYMENT TYPICAL VENT BLOCK EQ.EQ.EQ.EQ. EQ . EQ . (3) 2 1/2" DIA HOLE PER BLOCK 2X EAVE BLOCK WITH 1/4" WIRE MESH NOTE: 1.EACH BLK PROVIDES APPROX 13 SQ. INCHES OF VENTILATION. 2.MINIMUM BLOCK SIZE 2X4X14 1/2". 3.TYPICAL ATTIC: 1 VENT BLOCK AT EVERY OTHER BAY. 4.SLOPING CEILING: 1 VENT BLOCK AT EACH BAY. STRUCTURAL SHEATHING AS REQUIRED LTP4@24" O.C. (SEE SW SCHEDULE) BN. 2X RO O F R A F T E R AS PER P L A N ROOF SHEATHING AND NAILING AS PER PLAN 2X CEILING JOIST SPACING PER PLAN 6-16d 2x STUD @ 16" O.C. BEAM OR STUD WALL PER PLAN FASCIA 7/8" STUCCO SOFFIT BOARD 1 HOUR FIRE RATED ROOF OVERHANG DETAIL 2x SOLID BLK'G w/ 16d @ 12"oc ROOF DIAPHRAGM 2x4 FLAT OUTLOOKER @24"oc DIAPHRAGM BOUNDARY NAIL (2)16d SHEAR PANEL THROUGH ROOF 2x FACIA ROOF RAFTER CEILING JOIST 2x4 @ 4'oc 2x BLK'G @4'oc SHEAR PANEL EDGE NAIL 7/8" STUCCO STUD WALL 1 HOUR FIRE RATED ROOF OVERHANG DETAIL 20 FT MAX. FROM ACCESS 24" WIDE SOLID FLOORING 30-INCH WIDE WORKING SPACE AT CONTROLS 3/4" SUBFLOOR 30"X30" ACCESS OPENING PER PLAN FURNACE IN ATTIC 42 " M I N . C L R . @ F A U UN I T R E C O M M E N D E D VE R I F Y W / M E C H 12 " MI N . 2"x2" x1/8" ANGLE MOUNTING BRACKETS ( TOTAL OF FOUR) WITH THE MAXIMUM DISTANCE OF 4" FROM THE EDGE OF THE UNIT. ATTACH BRACKETS TO FAN COIL USING NO. 10 SELF TAPPING SCREWS AND TO STUDS USING 5/8" LAG SCREWS. 3/4" PLYWOOD NAILED TO FRAMING WITH 8d NAILS @ 6"/12" WITH A35's OR EQUAL AT EACH CORNER OF NEW UNIT NE W D E T A C H E D A D U 11 2 8 E L A I N E D R ( A D U ) , SA N T A A N A , C A 9 2 7 0 3 Job # Sheet No.: Scale Date Pr o j e c t f o r : SEAL: SHEET DESCRIPTION : 10/14/25 24212 OW N E R : EN G I N E E R : DI E M L E & T A O P H A M 11 2 6 E L A I N E D R , SA N T A A N A , C A 9 2 7 0 3 71 4 - 6 0 0 - 7 7 8 1 AD1 ARCHITECTURAL DETAILS S S S S S S S UTILITY SYMBOLS OUTLET 110 V DUPLEX OUTLETA.F.C.I SWITCHES 2- WAY SWITCH 3- WAY SWITCH 4- WAY SWITCH DIMMER SWITCH 3- WAY DIMMER 4- WAY DIMMER LIGHTING/EXHAUST FANS WALL MOUNT LIGHT: LED LIGHT FIXTURE CEILING MOUNT HANGING LIGHT: LED LIGHT (PROVIDE SOLID BLOCKING) CEILING RECESSED LED LIGHT FIXTURE BATH ROOM EXHAUST FAN - 50 CFM MIN.: VENT TO OUTSIDE AIR. 3 4 D 3D 4D H S/C COMBINATION SMOKE/CARBON MONOXIDE ALARM, CEILING MOUNTED, HARD WIRED AND W/ BATTERY BACK UP.ICC APPROVED S SMOKE DETECTOR, HARD WIRED AND W/ BATTERY BACK UP.ICC APPROVED (INSTALL AS PER 2022 CBC) INTERCONNECTED KITCHEN EXHAUST FAN - 280 CFM MIN.: VENT TO OUTSIDE AIR. VACANCY SENSOR V.S. S MOTION SENSOR AND PHOTO-SENSOR COMBINATIONS M.S. 110 V G.F.C.I. DUPLEX OUTLETG.F.C.I G.F.C.I /W.P. 110 V WEATHERPROOF G.F.C.I. OUTLET 220 V OUTLET WALL MOUNT MULTI-LIGHT: LED LIGHT FIXTURE CAST IRONSINKSBROOKFIELDK-5942-5 IS L A N D (N) KITCHEN 9'-0" CLG STACK W/D CLOSET CLOSET CAST IRONSINKSBROOKFIELDK-5942-5 CAST IRONSINKSBROOKFIELDK-5942-5 (N) LIVING 9'-0'' CLG W.I.C. (N) BED #1 9'-0" CLG (N) BED #2 9'-0" CLG (N) BED #3 9'-0" CLG (N) HEAT PUMP CONDENSER- ADU WH HP LA N D I N G (N) BA #1 9'-0" CLG (N) BA #2 9'-0" CLG (N ) P O R C H 21 S . F . A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I WP/G.F.C.I. 240V MIN.; 30 AMP MIN. WP/G.F.C.I. WP / G . F . C . I . WP/G.F.C.I. WP/G.F.C.I. S/CS S S G. F . C . I . G. F . C . I . 240V MIN.; 30 AMP MIN. (FOR ELECTRIC DRYER READY) WP/G.F.C.I. 240V MIN.; 30 AMP MIN. OUTLET FOR DISPOSAL 240V MIN.; 50 AMP MIN. (FOR ELECTRIC STOVE READY) IAQ FAN 65 CFM MIN. 1 SONE MAX. A. F . C . I . / G. F . C . I . A. F . C . I . / G. F . C . I . A. F . C . I . / G. F . C . I . A. F . C . I . / G. F . C . I . A. F . C . I . / G. F . C . I . A.F.C.I./ G.F.C.I. A.F.C.I./ G.F.C.I. A.F.C.I./ G.F.C.I. A.F.C.I./ G.F.C.I. A.F.C.I./ G.F.C.I. S SWITCH FOR GAR. DISPOSAL OUTLET FOR HOOD A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I A.F.C.I A. F . C . I A.F.C.I A.F.C.I G.F.C.I. G.F.C.I. S M.S.S 3D DS D S DS S 3D S 3D SSS3D V.S. S V.S. SSS D V.S. SSS D A.F.C.I A.F.C.I./ G.F.C.I. A.F.C.I./ G.F.C.I. OUTLET FOR D.W. S PROVIDE LIGHT SWITCH AND RECEPTACLE IN ATTIC ACCESS G.F.C.I.OUTLET FOR THE HEATING FURNACE IN ATTIC ELECTRICAL NOTE: 1.In new construction, the required smoke alarms shall receive their primary power from the building wiring and shall be equipped with a battery backup. Smoke alarms may be solely battery operated when installed in existing sleeping rooms and hallways [§907.2.11.4 CBC] (R314.6 CRC). 2.Where more than one smoke alarm is required to be installed, the smoke alarm shall be interconnected in such a manner that the activation of one alarm will activate all of the alarms. (R314.4 CRC) 3.Tankless water heaters shall be nationally listed and be installed in accordance with the installation instructions that were approved as part of their listing.The gas piping serving this appliance must be sized in compliance with the water heater's listed installation instructions and the 2022 California Plumbing Code. 4.Provide clothes dryer moisture exhaust duct (min. 4 inch dia., smooth, metal duct) to the outside and equip with a back draft damper. Exhaust duct length is limited to 14 ft. with 2 elbows. 5.Provide arc-fault circuit interrupter protection for all outlets for all dwelling unit. [§210.12 CEC] 6.A minimum of 2-20 amp small appliance branch circuits shall be provided for all receptacle outlets in the kitchen, dining room, pantry, or other similar areas [§210.11(C)(1) CEC] 7.A switched light shall be installed at all exterior doors. [§210.70 CEC] 8.At least one 20 amp branch circuit shall be provided to supply bathroom and laundry receptacle outlets. Such circuits shall have no other outlets. [§210.11(C)(3); §210.11(C)(2) CEC] ELECTRICAL NOTE: 1.Water Heating. Systems using gas or propane water heaters to serve individual dwelling units shall include the following components [150.0(N)]: a.A dedicated 125V, 20A (10 AWG copper branch circuit) electrical receptacle that is within 3 feet from the water heater and accessible to the water heater with no obstructions. There shall be a reserved single pole breaker space in the electrical panel labeled "Future 240V Use". Both ends of the unused conductor shall be labeled with the word “spare” and be electrically isolated. b.A condensate drain that is no more than 2 inches higher than the base of the installed water heater, and allows natural draining without pump assistance. c.Designate a space at least 2.5 ft. by 2.5 ft. wide and 7 ft. tall suitable for the future installation of a heat pump water heater (HPWH). d.If designated space is more than 3 feet from water heater, comply with 150.0(n)B. 2.In addition to the local exhaust fans in the bathrooms and kitchens, an exhaust fan shall be sized to provide ventilation for the whole house. The minimum ventilation rate for the whole-building exhaust fan shall be calculated according to ASHRAE Standard 62.2 Equation 4.1(a). The conditioned floor area and the number of bedrooms in the home (the existing house and the addition) will determine the minimum ventilation rate. One of the local exhaust fans in the bathrooms or kitchens may be used to meet the whole-building ventilation, provided the exhaust fan meets the minimum ventilation rated for both the Local Exhaust and Whole-Building Ventilation requirements. The ducting for the whole building exhaust fan shall be sized according to ASHRAE Standard 62.2 Table 7.1 and this exhaust fan shall operate continuously. Identify fan manufacturer, model and sone rating (1 sone for continuous, may be 3 sone for intermittent) on plans. 3.The whole-building ventilation exhaust fan will operate continuously and is required to be rated for sound at a maximum of 1 sone. This exhaust fan can be controlled by a standard on/off switch but the switch must be labeled to inform the occupant that the exhaust fan is the whole-building ventilation exhaust fan and is intended to operate continuously. No specific wording is mandated, but the wording needs to make clear what the control is for and the importance of operating the system. This may be as simple as “Ventilation Control” or might include wording such as: “Operate when the house is in use” or “Keep on except when gone over 7 days” or “Fan is to be left on to ensure indoor air quality.” 4.Access to attic furnace must be within 20 feet of unit and shall have a continuous solid walkway at least 24 inches wide. A switch controlled light is also required. [CMC 304.4.1]. 5.Countertops in the kitchen, dining area and similar areas require a receptacle be provided for each counter space wider than 12 inches so that no point is more than 24" from an outlet. [CEC 210.52(C)] Additional outlet required between cooktop and sink to meet spacing requirements. 6.Outlets to be tamper resistant per CEC 406.12. 7.All 125-volt through 250-volt receptacles shall be GFI protected at required locations. 8.Bathroom outlet(s) shall be on a dedicated 20 amp circuit. 9.A kitchen is defined as any room containing cooking appliances. Each kitchen is required to have an exhaust fan ducted to the outside with a minimum ventilation rate and capture efficiency per Table 150.0-G or Table 160.2-G (multi-family). The range hood over the stove may be used to meet this requirement but the range hood must vent to the outside; recirculating range hoods cannot be used. The ducting for the exhaust fan shall be sized according to ASHRAE Standard 62.2 Table 7.1. This local exhaust fan may operate continuously or intermittently. Installing this local exhaust fan in the kitchen will allow the home occupant to regulate the indoor air quality when needed. 10.Provide the following Electric-Ready requirements: [150.0] A.Heat Pump Space Heater Ready. Systems using gas or propane furnace to serve individual dwelling units shall include the following: 1.A dedicated 240 volt branch circuit wiring shall be installed within 3 ft. from the furnace and accessible to the furnace with no obstructions. The branch circuit conductors shall be rated at 30 amps minimum. The blank cover shall be identified as “240V ready”. 2. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a future heat pump space heater installation. The reserved space shall be permanently marked as “For Future 240V use.” B.Electric Cooktop Ready. Systems using gas or propane cooktop to serve individual dwelling units shall include the following: 1. A dedicated 240 volt branch circuit wiring shall be installed within 3 ft. from the cooktop and accessible to the cooktop with no obstructions. The branch circuit conductors shall be rated at 50 amps minimum. The blank cover shall be identified as “240V ready”. 2. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a future electric cooktop installation. The reserved space shall be permanently marked as “For Future 240V use.” C.Electric Clothes Dryer Ready. Clothes dryer locations with gas or propane plumbing to serve individual dwelling units shall include the following: 1. A dedicated 240 volt branch circuit wiring shall be installed within 3 ft. from the clothes dryer location and accessible to the clothes dryer location with no obstructions. The branch circuit conductors shall be rated at 30 amps minimum. The blank cover shall be identified as “240V ready.” 2. The main electrical service panel shall have a reserved space to allow for the installation of a double pole circuit breaker for a future electric clothes dryer installation. The reserved space shall be permanently marked as “For Future 240V use.” 9.All single-family residences that include one or two dwelling units shall meet the following: [150.0(s)] A.At least one of the following shall be provided: 1. ESS ready interconnection equipment with a minimum backed-up capacity of 60 amps and a minimum of four ESS-supplied branch circuits; or 2. A dedicated raceway from the main service to a panelboard (subpanel) that supplies the branch circuits in Sec. 150.0(s)(2). All branch circuits are permitted to be supplied by the main service panel prior to the installation of an ESS. The trade size of the raceway shall be not less than 1 inch. The panelboard that supplies the branch circuits (subpanel) must be labeled “Subpanel shall include all backed-up load circuits.” B.A minimum of four branch circuits shall be identified and have their source of supply collocated at a single panelboard suitable to be supplied by the ESS. At least one circuit shall supply the refrigerator, one lighting circuit shall be located near the primary egress and at least one circuit shall supply a sleeping room receptacle outlet. C.The main panelboard shall have a minimum busbar rating of 225 amps. D.Sufficient space shall be reserved to allow future installation of a system isolation equipment/ transfer switch within 3 ft. of the main panelboard. Raceways shall be installed between the panelboard and the system isolation equipment/transfer switch location to allow the connection of backup power source. 10. Smoke alarms shall receive their primary power from the building wiring and shall be equipped with a battery backup. [CRC Section R314] 11. Carbon monoxide alarms shall receive their primary power from the building wiring and shall be equipped with a battery backup. [CRC Section R315] 12. All services supplying dwelling units shall be provided with a surge-protection device (SPD) as an integral part of the service equipment, or immediately adjacent thereto. Specifically includes service equipment replacements and upgrades. CEC 230.67 13. Bathroom exhaust fans shall be ENERGY STAR compliant, ducted to terminate outside the building, and controlled by a humidistat capable of being adjusted between the relative humidity range of 50 to 80 percent. [CGBC 4.506] E1 UTILITY PLANS SCALE: UTILITY PLAN - ADU NE W D E T A C H E D A D U 11 2 8 E L A I N E D R ( A D U ) , SA N T A A N A , C A 9 2 7 0 3 Job # Sheet No.: Scale Date Pr o j e c t f o r : SEAL: SHEET DESCRIPTION : 10/14/25 24212 OW N E R : EN G I N E E R : DI E M L E & T A O P H A M 11 2 6 E L A I N E D R , SA N T A A N A , C A 9 2 7 0 3 71 4 - 6 0 0 - 7 7 8 1 2 2 NOTE: FOR AN FAU LOCATED IN THE ATTIC, PROVIDE A MINIMUM ACCESS OF 22 X 30 INCHES, A 24-INCH WIDE WALKWAY, A 30-INCH DEEP WORK PLATFORM, AND ELECTRIC LIGHT OUTLET ADJACENT TO THE FURNACE AND SWITCHED BY THE OPENING. (CMC 904.11 & 305) 2 Job # Sheet No.: Scale Date Pl a n C h e c k # : __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ SEAL: SHEET DESCRIPTION : 02/10/2025 S24212 DE T A C H E D A D U 11 2 8 E L A I N E D R . , SA N T A A N A , C A 9 2 7 0 3 Pr o j e c t f o r : SHEET INDEX: SHEET TITLE S0 STRUCTURAL NOTES S1 FOUNDATION & ROOF FRAMING PLAN SD1 FOUNDATION DETAILS SD2 FRAMING DETAILS SINGLE/REPTITIVE 2X4 #2: Fb = 1350/1552 PSI ; Fv=180 PSI, E=1.6x106 2X6 #2: Fb = 1170/1345 PSI 2X8 #2: Fb = 1080/1242 PSI 2X10 #2: Fb = 990/1138 PSI 2X12 #2: Fb = 900/1150 PSI 2X14 #2: Fb = 810/ 931 PSI 1.ALL STRUCTURAL SAWN LUMBER SHALL BE GRADED BY ONE OF THE FOLLOWING: W.C.L.I.B., W.W.P.A., N.L.G.A, or PS 20. 2.ALL WOOD BEARING ON CONCRETE OR MASONRY SHALL BE PRESSURE TREATED DOUGLAS FIR (PTDF), U.N.O 3.HOLES FOR BOLTS SHALL BE BORED WITH A BIT 1/32" TO 1/16" LARGER THAN THE NOMINAL BOLT DIAMETER. 4.ALL BOLTS SHALL BE RE-TIGHTENED PRIOR TO APPLICATION OF FINISH MATERIALS (PLYWOOD, PLASTER, DRYWALL, INSULATION, ETC.) 5.STRUCTURAL MEMBERS SHALL NOT BE CUT FOR PIPES, ETC. UNLESS SPECIFICALLY NOTED OR DETAILED. CONTACT ENGINEER IF NOT SHOWN. 6.2X SOLID BLOCKING SHALL BE PLACED BETWEEN JOISTS AND/OR RAFTERS AT ALL SUPPORTS, EXCEPT WHEN LEDGERED (U.N.O.) 7.CROSS-BRIDGING SHALL BE PROVIDED AT 8'-0" O.C. MAX. FOR ALL 2X FLOOR JOISTS OVER 10" IN DEPTH AND ALL 2X ROOF RAFTERS OVER 10" DEPTH. USE SOLID BLOCKING OR AN APPROVED METAL TYPE BRIDGING. 8.ALL STRUCTURAL PLYWOOD SHALL BE A.P.A. RATED SHEATHING (OR OSB) EXPOSURE 1 OR EXTERIOR UNLESS NOTED OTHERWISE AND CONFORM TO DOC PS1 OR PS2. EACH SHEET SHALL BE IDENTIFIED BY GRADE MARK OF D.F.P.A OR A.P.A. 9.ALL BOLTS BEARING ON WOOD SHALL HAVE STANDARD CUT WASHERS UNDER HEAD AND NUT UNLESS NOTED OTHERWISE. 10.ALL METAL ANCHORS, FASTENERS AND CONNECTORS ETC. SHALL BE FROM "SIMPSON STRONG-TIE" (TM). SUBSTITUTIONS MUST BE ICC-ESR PRODUCTS AND PRE-APPROVED IN WRITING BY ENGINEER. 11. ALL STRUCTURAL LUMBER SHALL BE DOUGLAS FIR-LARCH (OR BTR.), 19% MAX. MOISTURE CONTENT, OF THE FOLLOWING GRADES, U.N.O.: WALLS 2X4 STUDS (UP TO 10')"STANDARD" OR BETTER 2X4 STUDS (OVER 10')NO.2 OR BETTER 2X PLATES & 3X PLATES "CONSTRUCTION GRADE" OR BETTER 2X6 STUDS NO.2 2X JOIST NO.2 12.ALL NAILING TO BE PER TABLE NUMBER 2304.9.1 OF THE LATEST CALIFORNIA BUILDING CODE (CBC), UNLESS NOTED OTHERWISE. 13.PLYWOOD FLOOR AND ROOF SHEATHING SHALL BE LAID CONTINUOUS OVER TWO OR MORE SUPPORTS WITH FACE GRAIN PERPENDICULAR TO SUPPORTS (UNLESS SHOWN OTHERWISE). STAGGER ALL PLYWOOD PANELS A MINIMUM OF 4'-0". 14.FLOOR SHEATHING TO BE NAILED AND GLUED TO THE JOISTS. USE ADHESIVES PER A.P.A. AFG-01 OR ASTM D3498. 15.FRAMING CONTRACTOR SHALL PROVIDE BACKING AS REQUIRED FOR ALL LIGHT FIXTURES, CABINETS, WARDROBES, TOWEL BARS, AND HANDRAILS AS REQUIRED AND REQUESTED BY GENERAL CONTRACTOR. 16.EXTERIOR WOOD POSTS AND COLUMNS SUPPORTED BY A CONCRETE SLAB SHALL BE INSTALLED A MINIMUM OF 8" ABOVE EXPOSED EARTH AND AT LEAST 1" ABOVE SLAB ON METAL POST BASES. (EXCEPTION: POSTS OR COLUMNS OF APPROVED WOOD WITH NATURAL RESISTANCE TO DECAY OR TREATED WOOD). POSTS OR COLUMNS RESTING ON CON-CRETE PIERS SURROUNDED BY EXISTING GRADE SHALL BE A MINIMUM OF 8" ABOVE ADJACENT GRADE PER CBC (LATEST EDITION). ALL ISOLATED INTERIOR AND EXTERIOR WOOD POSTS ATTACHED DIRECTLY TO CONCRETE SHALL BE SECURED WITH SIMPSON 'ABU', U.N.O. 17.PROVIDE 2x4 FLAT HEADERS AT ALL INTERIOR NON-BEARING OPENINGS UP TO 36 INCHES IN WIDTH AND 4x4 HEADERS FOR OPENINGS 3 ft TO 6 ft IN WIDTH. 18.PROVIDE MINIMUM 1/2" CLEARANCE (VOID SPACE) FROM TOP OF ALL INTERIOR NON-BEARING PARTITIONS TO ROOF AND CEILING FRAMING ABOVE. 19.ALL EXTERIOR WALLS ADJACENT TO VAULTED CEILINGS SHALL BE BALLOON FRAMED WITH CONTINUOUS STUDS TO BOT. CHORD OF TRUSS OR 2X RAFTER OR DOUBLE 2x TOP PLATE, U.N.O. 20.WHEN PLYWOOD SIDING IS USED AS AN EXTERIOR OR INTERIOR WALL COVERING, PROVIDE SOLID BLOCKING AT ANY HORIZONTAL JOINTS BETWEEN SOLE PLATE AND ANY TOP PLATE. "Z" BAR METAL SHALL BE USED AT EXTERIOR HORIZONTAL JOINTS. 21.INSTALL FIREBLOCKS TO CUT OFF ALL HORIZONTAL AND VERTICAL DRAFT OPENINGS BETWEEN TWO STORIES AND ROOF ATTIC SPACES. FIREBLOCKS SHALL BE OF 2 INCH NOMINAL THICKNESS. LOCATION OF FIREBLOCKS SHALL INCLUDE: A.STUD WALLS AT FURRED SOFFITS, CEILING AND FLOOR LEVELS. B.AROUND TOP, BOTTOM, SIDES AND ENDS OF SLIDING POCKET DOORS C.BETWEEN STAIR STRINGERS AT TOP AND BOTTOM OF RUN AND BETWEEN STUDS IN A WALL PARALLEL AND ADJOINING RUN OF STAIRS. 22.FASTENING OF MULTIPLE MEMBERS: DOUBLE & TRIPLE JOISTS; 16d NAILS AT 12" O.C STAGGERED (BOTH SIDES FOR TRIPLES). FOUR OR MORE JOISTS; 1/2" DIA. M.B's AT 18" O.C STAGGERED. 4X OR LARGER BEAMS; 1/2" DIA. M.B's AT 12" O.C STAGGERED. 23.ALL ROUGH OR RESAWN BEAMS ARE TO BE FREE OF GRADING STAMP LABELS AND FREE OF HEART CENTER (FOHC). 24.ALL HANGING 2X JOISTS SHALL UTILIZE SIMPSON "LUS" HANGERS, U.N.O. AND SIMPSON "IUS" FOR I-JOISTS, U.N.O. 25.ALL BEARING WALLS ON A WOOD FLOOR ARE TO BE SUPPORTED WITH DOUBLE JOISTS OR SOLID BLOCKING, UNLESS NOTED OTHERWISE. 26.ALL BEAMS TO BE SUPPORTED WITH FULL BEARING STUDS OR POSTS, U.N.O. 27.ROOF SHEATHING IS TO CONTINUE UNDER "CALIFORNIA FRAMING", TYP. 28.APPLY SHEAR WALL PLYWOOD PRIOR TO ALL BOX-OUTS, FUR-OUTS, SOFFITS OR ANY OTHER FRAMING THAT MAY INTERRUPT CONTINUITY OF PLYWOOD. 29.PROVIDE FURRING AS NEEDED TO ALIGN NON-SHEAR WALLS WITH SHEAR WALLS. 30.PROVIDE 4X OR DOUBLE 2X MEMBERS UNDER SOLE PLATE NAILING LESS THAN 4 in. O.C., U.N.O. 31.DOUBLE TOP PLATES w/MIN. 48 in. LAP SPLICES TO BE PROVIDED W/ MIN. (12) 16d COMMON NAILS PER TOP PLATE SPLICE U.N.O. PER PLAN. 32.TOP PLATE BREAKS AND SPLICES SHALL OCCUR OVER A STUD OR POST. 33.PROVIDE SOLID BLK'G BETWEEN PERPENDICULAR JOIST AT BEARING AND AT SHEAR WALLS. 34.ALL EXPOSED BEAMS AND HEAVY TIMBER RECOMMENDED TO BE FREE OF HEART CENTER (FOHC). 35.ALL ISOLATED POSTS AND BEAMS TO HAVE SIMPSON ABU's, PB's AND/OR BC's MINIMUM, U.N.O. 36.ALL SIMP. HDU, HTT, HDQ, HHDQ, AND CB HOLDOWNS TO BE FASTENED TO 4x4 POST MIN., U.N.O. 37.ALL EXTERIOR WALLS AND INTERIOR BEARING WALLS ARE TO BE SECURED WITH MIN. 5/8" DIA. x 12" ANCHOR BOLTS AT 72 in. O.C., U.N.O. MIN. (2) BOLTS PER PIECE WITH (1) BOLT LOCATED NOT MORE THAT 12" OR LESS THAN 7 BOLT DIA. FROM EACH END AND/OR SPLICE OF THE PIECE. 38.ALL INTERIOR NON-SHEAR WALLS TO BE SECURED WITH ICC-ESR APPROVED SHOT PINS WITH CADMIUM WASHERS AT 32" O.C. PER MANUF. SPECS., U.N.O. PROVIDE ANCHOR 6" FROM ALL CORNERS AND SPLICES. 39.ALL CONVENTIONAL FRAME PORTIONS OF STRUCTURE ARE TO BE CONSTRUCTED PER SECTION 2308 OF THE CALIFORNIA BUILDING CODE (CBC), U.N.O. 40.ALL SHOP DRAWINGS ARE TO BE REVIEWED BY THE GENERAL CONTRACTOR AND THE ARCHITECT PRIOR TO SUBMITTAL FOR ENGINEER REVIEW. 41. PROVIDE MIN. 2X6 RAFTERS AT 24" O.C. WITH MAX. SPAN OF 6'-0"± BRACED TO FRAMING BELOW AT OVERSTACK ("CALIFORNIA") FRAMING. 42.PROVIDE DOUBLE 2X SOLE PLATES WITH PROGRESSIVE SOLE PLATE NAILING AS SPECIFIED ON THE PLANS AT BOTH PLATES WHERE 1 1/2" LIGHT WEIGHT CONCRETE IS USED AT THE FLOOR. 43.WHERE BOTH TOP PLATES ARE BROKEN, SPLICE WITH ST6224 MIN. U.N.O. 44.COMMON NAILS SHALL BE USED FOR ALL SHEATHING AND TOP PLATE SPLICES. BOX NAILS MAY BE USED AT SOLE PLATE NAILING. ALL HARDWARE SHALL BE INSTALLED WITH NAILS PER THE MANUFACTURERS SPECIFICATIONS AND RECOMMENDATIONS. 45.ALL HEADERS SHALL BE FRAMED WITH A MINIMUM OF (1) 2X4 TRIMMER AND (1) 2X4 KING STUD AT EACH END, U.N.O. 46. AT ANY SOLE PLATES OR TOP PLATES CUT FOR PIPES, PROVIDE A .058" THICK (16 GA.) AND 1 1 2 " WIDE PLATE ACROSS EACH SIDE OF OPENING WITH NOT LESS THAN (6) 16d NAILS. 47.PROVIDE SOIL BLOCKING AT SOFFIT CEILINGS. 48.SHEAR SHALL BE CONTINUOUS FROM BOTTOM PLATES TO TOP PLATES., U.N.O. 49.STAIR STRINGER SHALL BE 2x12 DF#1 AT MAX. 16" O.C., U.N.O. 50.A SINGLE TOP PLATE IS PERMITTED PROVIDED THE PLATE IS ADEQUATELY TIED AT JOINTS, CORNERS AND INTERSECTING WALLS BY AT LEAST THE EQUIVALENT OF 3 IN, X 6 IN. X .036 IN. THICK GALVANIZED STEEL PLATE THAT IS NAILED TO EACH WALL OR SEGMENT OF WALL BY (6) 8d NAILS OR EQUIVALENT. 51.FASTENERS FOR PRESERVATIVE-TREATED OR FIRE-RETARDANT-TREATED WOOD SHALL BE OF HOT DIPPED ZINC-COATED GALVANIZED STEEL IN ACCORDANCE WITH ASTM A 153 LUMBER/CARPENTRY DESIGN LOADS SIMPSON ICC - ESR REPORTS 1.CONTINUOUS AND PERIODIC SPECIAL INSPECTION IS REQUIRED FOR THE WORK AS DESCRIBED IN CBC 2022 CHAPTER 17, SEE INSPECTION SCHEDULE BELOW ONLY CHECKED ITEMS ARE REQUIRED 2.APPROVAL BY THE INSPECTOR DOES NOT MEAN APPROVAL OF FAILURE TO COMPLY WITH THE PLANS OR SPECIFICATIONS. ANY DETAIL THAT FAILS TO BE CLEAR OR IS AMBIGUOUS MUST BE REFERRED TO THE STRUCTURAL ENGINEER FOR INTERPRETATION OR CLARIFICATION 3.FOR VERIFICATION AND INSPECTION OF SOILS SEE SOILS REPORT 4.CONTINUOUS SPECIAL INSPECTION PER AWS D1.1 IS REQUIRED FOR ALL STRUCTURAL STEEL WELDING, EXCEPT FOR SINGLE PASS FILLET WELDS NOT EXCEEDING 5/16" IN SIZE WELDING INSPECTORS SHALL BE AWS Q.C.-1 CERTIFIED 5.STRUCTURAL WOOD. PERIODIC SPECIAL INSPECTION IS REQUIRED FOR WOOD SHEAR WALLS, SHEAR PANELS, AND DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING, AND OTHER FASTENING OF COMPONENTS OF THE SEISMIC FORCE RESISTING SYSTEM, INCLUDING WOOD SHEAR WALLS, WOOD DIAPHRAGMS, DRAG STRUTS, BRACES, SHEAR PANELS, AND HOLDOWNS EXCEPTION: SPECIAL INSPECTION IS NOT REQUIRED FOR WOOD SHEAR WALLS, SHEAR PANELS AND DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING AND OTHER FASTENING TO OTHER COMPONENTS OF THE SEISMIC-FORCE-RESISTING SYSTEM, WHERE THE FASTENER SPACING OF THE SHEATHING IS MORE THAN 4 INCHES ON CENTER (O.C.) INSPECTIONS SHALL BE PERFORMED BEFORE COVERING 6.CONTRACTORS RESPONSIBLE FOR CONSTRUCTION OF A WIND OR SEISMIC FORCE RESISTING SYSTEM/COMPONENT LISTED IN THIS STATEMENT OF SPECIAL INSPECTION SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE LADBS INSPECTORS AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON SUCH A SYSTEM OR COMPONENT PER SEC 1704.4. 7.WHERE FABRICATION OF MEMBERS AND ASSEMBLIES IS PERFORMED ON THE PREMISES OF A FABRICATOR'S SHOP, SPECIAL INSPECTION OF THE FABRICATED ITEMS SHALL BE REQUIRED BY THIS SECTION, UNLESS THE FABRICATOR IS REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. APPROVAL SHALL BE BASED UPON REVIEW OF THE FABRICATOR'S WRITTEN PROCEDURAL AND QUALITY CONTROL MANUALS AND PERIODIC AUDITING OF FABRICATION PRACTICES BY AN APPROVED SPECIAL INSPECTION AGENCY. AT COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE BUILDING OFFICIAL STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL BE RESPONSIBLE OF VERIFYING APPROVAL OF FABRICATOR. ESR-1056 TITEN HD® SCREW ANCHOR ESR-1161 CONTINUOUS ROD TIE-DOWN SYSTEM UTILIZING URS UPLIFT ROD RUNS ESL-1168 SET-3G™ EPOXY ADHESIVE ANCHORS IN CRACKED AND UNCRACKED CONCRETE ESR-1267 STRONG-WALL® SHEAR PANELS ESR-1396 WEDGE-ALL ANCHORS ESR-1472 WSNTL WOOD SCREWS ESR-1622 POST BASE CONNECTORS FOR WOOD CONSTRUCTION ESR-1679 STEEL STRONG-WALL SHEAR PANELS ESR-1772 SET EPOXY ESR-1958 ACRYLIC-TIE ADHESIVE ANCHOR SYSTEM ESR-2105 STRAPS ESR-2138 POWDER-ACTUATED FASTENERS, THREADED STUDS AND ASSEMBLIES ESR-2236 STRONG-DRIVE SDS SCREWS ESR-2320 COUPLING TAKE-UP DEVICE (CTUD), TAKE-UP DEVICE (TUD AND ATUD), RATCHETING TAKE-UP DEVICE (RTUD), AND TAKE-UP WASHER (TUW) ESR-2330 SCREW HOLD-DOWN (HOLDOWN) CONNECTORS ESR-2508 ALSO EN ESPAÑOL SET-XP EPOXY ADHESIVE ANCHORS FOR CRACKED AND UNCRACKED CONCRETE ESR-2523 INDEX OF SIMPSON STRONG-TIE STAMPED AND WELDED COLD-FORMED STEEL PRODUCTS FOR WOOD OR COLD-FORMED STEEL CONSTRUCTION ESR-2549 FACE-MOUNT HANGERS FOR WOOD FRAMING ESR-2551 ADJUSTABLE HANGERS AND HIP CONNECTORS FOR WOOD FRAMING ESR-2552 FACE-MOUNT HANGERS SUPPORTING ENGINEERED WOOD PRODUCTS (STRUCTURAL COMPOSITE LUMBER [SCL], PREFABRICATED WOOD I-JOISTS AND GLULAM BEAMS) ESR-2553 TOP-FLANGE HANGERS FOR SAWN LUMBER ESR-2555 MASA/MASAP CAST-IN-PLACE FOUNDATION ANCHOR STRAPS ESR-2604 COLUMN CAPS FOR WOOD CONSTRUCTION ESR-2605 CONNECTORS FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION ESR-2607 CONNECTORS FOR PANELIZED ROOF CONSTRUCTION ESR-2608 STUD SHOES, PLATE TIES, WALL BRACING, AND JOIST BRIDGING FOR WOOD CONSTRUCTION ESR-2611 SSTB SERIES AND SB SERIES CAST-IN-PLACE ANCHOR BOLTS ESR-2613 HURRICANE AND SEISMIC STRAPS AND TIES FOR WOOD FRAMING ESR-2615 TOP-FLANGE HANGERS FOR ENGINEERED WOOD PRODUCTS (EWP) ESR-2616 CONNECTORS ATTACHING WOOD MEMBERS TO CONCRETE CONSTRUCTION ESR-2652 STRONG-WALL® WOOD SHEARWALL PANELS (WSWS)STRONG-WALL® SB SHEARWALL PANELS (SWSBS) ESR-2705 TORQ-CUT™ SELF-UNDERCUTTING ANCHORS FOR CRACKED AND UNCRACKED CONCRETE ESR-2713 ALSO EN ESPAÑOL TITEN HD® SCREW ANCHOR AND TITEN HD® ROD HANGER FOR CRACKED AND UNCRACKED CONCRETE ESR-2762 METAL CONNECTOR PLATES FOR WOOD TRUSSES: AS-20 AND AS-18-HS ESR-2802 STRONG FRAME® SPECIAL MOMENT FRAME ESR-2811 GDP AND GDPS GAS-ACTUATED FASTENERS ESR-2877 WOOD FRAMING CONNECTORS FOR MASONRY CONSTRUCTION ESR-2920 CAST-IN-PLACE STRAP STYLE HOLDOWNS AND PURLIN ANCHORS IN CONCRETE ESR-3006 STRONG-DRIVE® X AND FPHSD SELF-DRILLING TAPPING SCREWS ESR-3037 ALSO EN ESPAÑOL STRONG-BOLT® 2 WEDGE ANCHOR ESR-3046 STRONG-DRIVE® SD AND SDWF SERIES SCREWS ESR-3050 EMBEDDED COLUMN BASES IN CONCRETE ESR-3096 CONNECTORS USING SD-SERIES SCREWS ESR-3372 ALSO EN ESPAÑOL ET-HP® EPOXY ADHESIVE ANCHORS FOR CRACKED AND UNCRACKED CONCRETE ESR-3403 ALSO EN ESPAÑOL COMPOSITE STRENGTHENING SYSTEMS (CSS) ESR-3638 ET-HP® ADHESIVE ANCHOR SYSTEMS FOR UNREINFORCED BRICK MASONRY ESR-3707 BLUE BANGER HANGER® CAST-IN-PLACE, INTERNALLY THREADED INSERTS IN CRACKED AND UNCRACKED CONCRETE ESR-4057 SET-3G™ EPOXY ADHESIVE ANCHORS IN CRACKED AND UNCRACKED CONCRETE ESR-4208 PPSD AND CBSDQ SELF-DRILLING TAPPING SCREWS SEISMIC DESIGN DATA IMPORTANCE FACTOR 1.0 SITE CLASS D SS 1.52 S1 0.59 SDS 1.18 SD1 0.847 SEISMIC DESIGN CAT.D SITE CLASSIFICATION D RISK FACTOR II CS 0.182 Fa 1.2 Fv 1.7 R 6.5 W 2.50 REDUNDANCY FACTOR 1.3 WIND DESIGN BASIC WIND SPEED 95 MPH RISK FACTOR 1.00 WIND EXPOSURE C INT. PRESSURE COEFF.0.18 ROOF DL =15 PSF LL =20 PSF CEILING DL =5 PSF LL =10 PSF EXTERIOR WALL DL =15 PSF INTERIOR WALL DL =10 PSF 2018 NDS STRESS VALUES FOR DOUGLAS FIR-LARCH: BEAMS AND STRINGERS 4X10 AND SMALLER NO.2 4X12 AND LARGER NO.1 6X AND 8X NO.1 4x POST/TIMBERS AND LARGER NO.1 ROOF PLANKING AND DECKING COM.DEX. BOARD SHTG. AND STRIPPING SUITABLE FOR INTENDED USE. SPECIAL INSPECTION B. HIGH-STRENGTH AND ANCHOR BOLTS 1704, 1705 & 1707 FOR THE FOLLOWING CONDITIONS: 1. SPECIAL INSPECTION IS REQUIRED PER CBC SECTION 109, C. STEEL MOMENT FRAME CONNECTIONS A. FIELD WELDING D. EPOXY ANCHORS (Continuous) (Continuous) E. STRUCTURAL MASONRY (AS NOTED) (Continuous) (Continuous) (Sect. 1704.5.1.3) F. STRUCTURAL PLYWOOD (<=4" O.C.)(Periodic) G. CONCRETE (OVER 2500 psi)(Continuous) H. POST-TENSION (WHEN OCCURS)(Continuous) I. CAST-IN-PLACE CAISSONS (Continuous) J. SOILS COMPLIANCE (Per Soils Report) 4X4 #2: Fb = 1350 PSI 4X6 #2: Fb = 1170 PSI 4X8 #2: Fb = 1170 PSI 4X10 #2: Fb = 1080 PSI 4X12 #1: Fb = 1100 PSI ; Fv=180 PSI, E= 1.7x106 4X14 #1: Fb = 1000 PSI 4X16 #1: Fb = 1000 PSI 6X10 #1: Fb = 1350 PSI ; Fv=170 PSI, E=1.6x106 6X12 #1: Fb = 1350 PSI S0 1.THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE STARTING STARTING ANY WORK. THE ENGINEER SHALL BE NOTIFIED OF ANY AND ALL DISCREPANCIES. 2.DIMENSIONING SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON DRAWINGS. TYPICAL DETAILS AND GENERAL NOTES ARE MINIMUM REQUIREMENTS TO BE USED WHEN CONDITIONS ARE NOT SHOWN OTHERWISE. 3.NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE SHOWN CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON PROJECT. 4.ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE 2022 EDITION OF THE CALIFORNIA BUILDING CODE (CBC), AND ANY OTHER REGULATING AGENCIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE WORK, INCLUDING THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY, AND THOSE CODES AND STANDARDS LISTED IN THESE NOTES AND SPECIFICATIONS. 5.APPROVAL BY THE INSPECTOR DOES NOT CONSTITUTE AUTHORITY TO DEVIATE FROM THE PLANS AND/OR SPECIFICATIONS. ANY DESIGN WHICH FAILS TO BE CLEAR OR IS AMBIGUOUS MUST BE REFERRED TO THE ENGINEER FOR INTERPRETATION OR CLARIFICATION. 6. SEE ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS FOR PITS, TRENCHES, ROOF OPENINGS, DEPRESSIONS ETC. NOT SHOWN ON STRUCTURAL DRAWINGS. 7.VIBRATION EFFECTS OF MECHANICAL EQUIPMENT HAVE NOT BEEN CONSIDERED BY ENGINEER. 8.THE DESIGN ADEQUACY AND SAFETY OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS SOLE RESPONSIBILITY OF THE CONTRACTOR, AND HAS NOT BEEN CONSIDERED BY THE ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE PRIOR TO THE APPLICATION OF ALL SHEAR WALLS, ROOF AND FLOOR DIAPHRAGMS AND FINISH MATERIALS. HE/SHE SHALL PROVIDE THE NECESSARY BRACING TO PROVIDE STABILITY PRIOR TO THE APPLICATION OF THE AFOREMENTIONED MATERIALS. STRUCTURAL OBSERVATION JOBSITE VISITS BY THE ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS. 9.CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK OPERATIONS FOR FILLED EXCAVATIONS OR BURIED STRUCTURES SUCH AS CESSPOOLS, CISTERNS, FOUNDATIONS, ETC. IF ANY SUCH STRUCTURES ARE FOUND, THE ENGINEER AND THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY. 10.CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF PLACED ON FRAMED FLOORS OR ROOF. LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH. 11.CONSTRUCTION DOCUMENTS IDENTIFIED AS "BID SET" ON ANY OR ALL SHEETS MAY BE SUBJECT TO REVIEW. THIS REVIEW MAY RESULT IN CHANGES WHICH MAY BE MADE TO THE PLANS PRIOR TO THE ISSUANCE OF THE FINAL CONSTRUCTION SET WHICH WILL CONTAIN NO "BID SET" DESIGNATIONS. CONSTRUCTION DOCUMENTS IDENTIFIED AS "BID SET" ARE NOT CONSTRUED AS BEING THE COMPLETED OR FINAL DRAWINGS AND THEY SHOULD NOT IN ANY WAY BE USED AS SUCH. 12.ALL GUARD AND HANDRAILS SHALL BE DESIGNED TO WITHSTAND A POINT LOAD OF 200 POUNDS APPLIED IN ANY DIRECTION AND AT ANY POINT TO TOP RAIL. A 50 PLF LOAD IS REQUIRED AT 3-STORY AND MULTI-FAMILY PROJECTS. IF OCCUPANT LOAD IS LESS THAN 50, A 20 PLF LOAD MAY BE USED. 13.THESE PLANS ARE INTENDED SOLELY FOR THE USE OF THE OWNER FOR CONSTRUCTION AND ARE EXPRESSLY NOT INTENDED FOR USE IN MARKETING. EXTERIOR ELEVATIONS AND OTHER DETAILS ON THESE PLANS ARE ONLY A REPRESENTATION AND MAY VARY SIGNIFICANTLY FROM THE ACTUAL CONSTRUCTION. 14.SLAB-ON-GRADE REQUIREMENTS TO BE PER THE SOIL ENGINEERS RECOMMENDATIONS SOLELY, U.N.O. THE SLAB-ON-GRADE IS A NON-STRUCTURAL ITEM AND THEREFORE HAS NOT BEEN DESIGNED BY THE STRUCTURAL ENGINEER, UNLESS NOTED OTHERWISE. 15.IN THE EVENT OF CONFLICT BETWEEN THE ARCHITECTURAL GENERAL NOTES AND THE STRUCTURAL GENERAL NOTES (SHT SGN), THE MORE STRINGENT REQUIREMENT SHALL GOVERN. 1.ALL REINFORCING SHALL BE ASTM A-615 GRADE 40 FOR #4 BARS AND SMALLER. ALL REINFORCING SHALL BE ASTM A-615 GRADE 60 FOR #5 BARS AND LARGER. WELDED WIRE FABRIC TO BE ASTM A-185, LAP 1-1/2 SPACES, 9" MIN. FOR STRUCTURAL SLABS ALL REINFORCING #5 AND LARGER TO BE ASTM A-615 GRADE 60 2.ALL BARS SHALL BE DEFORMED AS PER ASTM A615 / A615M. 3.ALL BARS SHALL BE CLEAN OF LOOSE FLAKY RUST, GREASE OR OR OTHER MATERIALS LIKELY TO IMPAIR BOND. 4.ALL BENDS SHALL BE MADE COLD. 5.SPLICING OF #3-#6 BARS SHALL HAVE A MIN. LAPPING OF 30 DIA. OR 2'-0" MIN. IN ALL CONTINUOUS REINFORCEMENT OF FOOTINGS AND CONCRETE WALLS, EXCEPT AS NOTED ON PLANS. MASONRY REINFORCEMENT SHALL HAVE LAPPINGS OF 40 DIA. FOR GRADE 40 AND 48 DIA. FOR GRADE 60 OR 2'-0" MIN., U.N.O. 6.ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE POURING CONCRETE. 7.CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE AT LEAST EQUAL TO THE DIAMETER OF THE BARS. COVER SHALL BE AS FOLLOW: CONCRETE MASONRY A.POURED AGAINST EARTH 3"2" B.POURED AGAINST FORM BELOW GRADE 2"2" #6 AND LARGER 2"2' #5 AND SMALLER 1 1 2"1 1 2" C.FORMED SLABS 1"1" D.SLABS ON GRADE (FROM TOP OF SLAB) 1"1" E.COLUMNS AND BEAMS TO MAIN BARS 1 1 2"2" F.WALLS EXPOSED TO WEATHER 1 1 2"1 1 2" NOT EXPOSED TO WEATHER, #11 AND SMALLER 3 4"3 4" #14 AND #18 1 1 2"1 1 2" 1.ALL SITE PREPARATION, EXCAVATION AND COMPACTION SHALL BE DONE UNDER THE SUPERVISION OF THE LICENSE CONTRACTOR AND THE SOIL ENGINEER (IF APPLICABLE) 2.SEPARATE PERMITS SHALL BE OBTAINED FOR ALL FENCES, PLANTERS AND WALLS, AS REQUIRED. 3.PROVIDE NON-EXPANSIVE FILL AS REQUIRED TO LEVEL PAD. 4.SURFACE WATER WILL DRAIN AWAY FROM BUILDING. DRAINAGE SHALL BE 2% (MIN.) FROM BUILDING TO SWALE LINE. SWALE SHALL DRAIN AT 1% (MIN.) FROM REAR OF BUILDING TO STREET. 5.THERE SHALL BE NO UTILITY TRENCH NEAR THE BUILDING FOUNDATION WHICH EXTEND DEEPER THAN A 45 DEGREE LINE PROJECTED DOWN AND AWAY FROM THE BOTTOM OUTSIDE CORNER OF ANY FOOTING. 6.SLAB SUBGRADE REQUIREMENTS ARE NOT WITHIN THE SCOPE OF WORK AND/OR LIABILITY OF ENGINEER OF RECORD. 7.ALL HOLDOWN ANCHORS, POST BASES AND HOLDOWN BOLTS SHALL BE TIED INTO PLACE PRIOR TO FOUNDATION INSPECTION. 8.PLACE 20'-0" REBAR IN FOUNDATION AT SERVICE LOCATIONS. STUB UP REBAR ABOVE THE FLOOR BY ELECTRIC SERVICE METERS. 9.FOR THE LOCATION OF CONTROL JOINTS, REFER TO THE FOUNDATION PLAN. (ZIP STRIP OR EQUAL). MINIMUM OF 20'-0" O.C. EACH WAY IS RECOMMENDED. 10.DRIVEWAY PAVING SHALL BE 4" PORTLAND CEMENT CONCRETE (5 SACKS MIN.), U.N.O. 11.FOR POST-TENSION SLAB, REFER TO APPROVED PLANS PREPARED BY OTHERS (WHEN OCCURS). 12.MINIMUM SLAB REINFORCEMENT AND PAD REQUIREMENT SHALL CONFORM TO THE LOCAL AHJ REQUIREMENTS OR THE SOILS ENGINEER'S RECOMMENDATIONS (IF APPLICABLE) FOUNDATION/SITEWORK REINFORCING STEEL GENERAL NOTES EXPOSURE REQUIREMENTS FOR CONCRETE BY EXPOSURE CLASS (ACI 318-19, Table 19.3.2.1) CLASS MAX. W/C MIN. F'c (PSI) ADDITIONAL REQUIREMENTS AIR CONTENT LIMITS ON CEMENT. MAT'L. F0 N/A 2,500 N/A N/A F1 0.45 4,500 ACI 318-19 TABLE 19.3.3.1 N/A F2 0.45 4,500 N/A F3 0.45 4,500 ACI 318-19 TABLE 19.2.1.1 EXPOSURE CLASS MAX. W/C MIN. F'c (PSI) CEMENTITIOUS MATERIAL TYPE ASTM C150 S0 N/A 2,500 S1 0.50 4,000 S2 0.45 4,500 S3 0.45 4,500 ASTM C595 ASTM C1157 CALCIUM CHLORIDE ------------ II V V+POZZOLAN or SLAG IP(MS), IS(<70), (MS) IP(HS), IS(<70), (HS) IP(HS)+POZ.orSLAG IS(<70), (HS)+POZ. MS HS HS+POZZOLAN or SLAG --- NOT PERMITTED NOT PERMITTED EXPOSURE CLASS MAX. W/C MIN. F'c (PSI) P0 N/A 2,500 P1 0.50 4,000 NONE NONE EXPOSURE CLASS MAX. W/C MIN. F'c (PSI) MAX. CHLORIDE ION CONTENT % BY WT. REINFORCED CONC. C0 N/A 2,500 C1 N/A 2,500 C2 0.40 5,000 RELATED PROVISIONS 1.00 --- 0.30 0.15 --- ACI 19.3.2.1 & 20.6.1.4.2 PRESTRESSED CONC. 0.06 0.06 0.06 ADDITIONAL REQUIREMENTS 1 2 3 4 5 5 5 5 6 1 1 1 FREEZING/THAWING SULFATE LOW PERMEABILITY CORROSION ACI 318-19 TABLE 19.3.3.1 ACI 318-19 TABLE 19.3.3.1 NOTES: 1. FOR LIGHT WEIGHT CONCRETE, SEE ACI 318-19, SECTION 19.2.4.2 2.ALTERNATIVE COMBINATIONS OF CEMENTITIOUS MATERIAL OF THOSE LISTED IN TABLE 19.3.2.1 SHALL BE PERMITTED WHEN TESTED FOR SULFATE RESISTANCE AND MEETING THE CRITERIA IN SECTION 19.3.1.1 3.FOR SEAWATER EXPOSURE, OTHER TYPES OF PORTLAND CEMENTS WITH TRICALCIUM ALUMINATE (C3A) CONTENTS UP TO 10% ARE PERMITTED IF THE W/C DOES NOT EXCEED 0.40 4.OTHER AVAILABLE TYPES OF CEMENT SUCH AS TYPE III OR TYPE I ARE PERMITTED IN EXPOSURE CLASSES S1 or S2 IF C3A CONTENTS ARE LESS THAN 8% or 5%, RESPECTIVELY 5.THE AMOUNT OF THE SPECIFIC SOURCE OF POZZOLAN or SLAG TO BE USED SHALL NOT BE LESS THAN THE AMOUNT DETERMINED BY SERVICE RECORD TO IMPROVE SULFATE RESISTANCE WHEN USED IN CONCRETE CONTAINING TYPE V CEMENT. ALT: THE AMOUNT OF THE SPECIFIC SOURCE OF THE POZZOLAN or SLAG TO BE USED SHALL NOT BE LESS THAN THE AMOUNT TESTED PER ASTM C1012 AND MEETING CRITERIA OF ACI 318-08, SECTION 19.3.1.1 6.WATER SOLUBLE CHLORIDE ION CONTENT THAT IS CONTRIBUTED FROM THE INGREDIENTS INCLUDING WATER, AGGREGATES, CEMENT AND ADMIXTURES SHALL BE DETERMINED PER ASTM C1218 BETWEEN 28 AND 42 DAYS. 1.ALL CONCRETE SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA RESIDENTIAL CODE (CRC 2022) 2.CONCRETE SHALL CONFORM TO "EXPOSURE CLASS" REQUIREMENTS OF ACI 318-19 REFER TO SOILS REPORT FOR SOIL CONDITIONS. 3.ALL CEMENT SHALL CONFORM TO ASTM C-150, C-595 OR C-1157. USE CEMENT TYPE TYPE II 4.FINE AND COARSE AGGREGATE SHALL CONFORM TO ASTM C-33 FOR STANDARD WEIGHT CONCRETE AND ASTM C-330 FOR LIGHTWEIGHT CONCRETE. 5.CONCRETE FOR SLAB-ON-GRADE SHALL HAVE A MAX. SLUMP OF 5" PER ASTM C-143 AND MAX. SLUMP OF 4" FOR FOOTINGS AND GRADE BEAMS, U.N.O. READY-MIX CONCRETE SHALL BE MIXED AND DELIVERED PER ASTM C-94. 6.DRYPACK SHALL BE COMPOSED OF ONE PART PORTLAND CEMENT TO NOT MORE THAN THREE PARTS SAND. 7.ANCHOR BOLTS, HOLDOWN BOLTS, DOWELS, INSERTS, ETC. SHALL BE SECURED INTO PLACE AND INSPECTED PRIOR TO POURING CONCRETE. 8.CONCRETE SHALL BE CURED BY KEEPING CONTINUOUSLY WET FOR 10-DAYS OR BY AN APPROVED CURING COMPOUND. 9.REFER TO ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR MISCELLANEOUS ITEMS TO BE CAST INTO CONCRETE AND FLOOR STEPS, DEPRESSIONS, PITS, CURBS, ETC. 10.SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF EXPANSION JOINTS, A/C PADS, SCORING, ETC. FOR CONCRETE WALKS AND SLABS. 11.ALL STRUCTURAL CONCRETE f'c = 2500 PSI ALL SLAB-ON-GRADE f'c = 2500 PSI ALL CONTINUOUS FOOTINGS AND PADS f'c = 2500 PSI ALL CONCRETE SHALL REACH MINIMUM COMPRESSIVE STRENGTH 28 - DAYS (MIN. W/C RATIO=0.5). CONCRETE 1.ALL GLUED LAMINATED MEMBERS SHALL BE MADE OF 1-1/2" DOUGLAS-FIR LARCH (DF) LAMINATIONS, COMBINATION 24F-V4 PER AITC/APA (U.N.O.). 2.DESIGN VALUES: Fb=2400 PSI; Fv=240 PSI; E=1.8X106 PSI 3.INDUSTRIAL APPEARANCE GRADE PER APA-EWS SHALL BE USED, WITH A MOISTURE CONTENT BETWEEN 7 - 14 PERCENT, UNLESS NOTED OTHERWISE. 4.FABRICATOR SHALL BE A MEMBER OF AITC AND ALL FABRICATION SHALL BE PERFORMED IN ACCORDANCE WITH AITC-A190.1 & ASTM-3737. LUMBER SHALL BE MARKED WITH AN AITC or APA-EWS GRADE STAMP INDICATING CONFORMANCE WITH ALL APPLICABLE SPECIFICATIONS AND REQUIREMENTS. 5.GLUED LAMINATED MEMBERS SHALL BE ACCOMPANIED BY A CERTIFICATE OF INSPECTION. CONTRACTOR SHALL BEAR EXPENSES OF INSPECTION AND TESTS. A CERTIFICATE OF INSPECTION SHALL BE SUBMITTED TO THE BUILDING DEPARTMENT PRIOR TO INSTALLATION. 6.ALL GLUED LAMINATED BEAMS WILL HAVE A STANDARD CAMBER BASED ON A RADIUS = 3500, UNLESS NOTED OTHERWISE. 7.PARALLAM PSL 2.2E BY I-LEVEL PER ESR-1387 & LARR-25202 fb = 2900 PSI; fv = 290 PSI; E = 2.2x106 PSI TIMBERSTRAND LSL 1.55E BY I-LEVEL PER ESR-1387 & LARR-25202 fb = 2250 PSI; fv = 310 PSI; E = 1.55x106 PSI MICROLAM LVL BY I-LEVEL PER ESR-1387 & LARR-25202 fb = 2600 PSI; fv = 285 PSI; E = 2.0x106 PSI 8.ALTERNATE ENGINEERED WOOD PRODUCTS MUST BE APPROVED IN WRITING BY ENGINEER PRIOR TO INSTALLATION. 9.PROVIDE MULTIPLE 2x4 SQUASH BLOCKS UNDER BEARING POINT LOAD (POST) (OR MSB) FROM ABOVE TO TOP PLATES BELOW AT FLOOR LEVEL. 10.I-LEVEL I-JOISTS PER ICC ESR#1533, RR#25538 LOUISIANA PACIFIC I-JOISTS PER ICC ESR#1130, RR#25176 BOISE CASCADE I-JOISTS PER ICC ESR#1336, RR#24999 ROSEBURG I-JOISTS PER ICC ESR#1251, RR#25439 11.PROVIDE DOUBLE I-JOISTS OR DOUBLE I-JOIST BLOCKS WHEN 16d SOLE PLATE NAILING (SPN) IS LESS THAN 4" O.C. AT SHEAR WALL ABOVE. 12.REFER TO I-JOIST MANUFACTURER SPECIFICATION FOR DRILLING OF HOLES THRU I-JOIST WEB. NOTCHING OF I-JOIST FLANGE IS PROHIBITED. GLULAMS/MFR. WD. PROD. 1. RAFTER/JOIST BLOCKING TO TOP PLATE, TOENAIL 3-8d 2.CEILING JOIST TO TOP PLATE, TOENAIL EACH END 3-8d 3.CEILING JOIST LAPS (NON-PARALLEL CONDITION), FACE NAIL 3-16d 4.CEILING JOIST LAPS (NON-PARALLEL CONDITION), FACE NAIL TABLE R802.5(9) 5.COLLAR TIE TO RAFTER, FACE NAIL EACH RAFTER 2-16d 6.RAFTER/ROOF TRUSS TO PLATE, 2 TOENAILS & 1 TOENAIL PER SIDE 3-10d 7. RAFTER TO RIDGE/HIP/VALLEY, TOE NAIL 3-10d RAFTER TO RIDGE/HIP/VALLEY, END NAIL 2-16d 8.STUD TO STUD (NON-BRACED WALLS), FACE NAIL 16d COMMON @ 24" O.C. 16d BOX @ 16" O.C. 9.STUDS AT CORNERS (BRACED WALLS), FACE NAIL 16d COMMON @ 16" O.C. 16d BOX @ 12" O.C. 10.BUILT-UP HEADER WITH 1/2" SPACER FACE NAIL 16d COMMON @ 16" O.C. 16d BOX @ 12" O.C. 11.CONTINUOUS HEADER TO STUD, TOE NAIL 4-8d 12.TOP PLATE TO TOP PLATE, FACE NAIL 16d COMMON AT 16" O.C. 10d BOX @ 12" O.C. 13.DOUBLE TOP PLATE SPLICE, FACE NAIL EACH SIDE 12-16d 14.BOTTOM PLATE TO RIM (NON-BRACED WALLS) FACE NAIL 16d COMMON AT 16" O.C. 16d BOX @ 12" O.C. 15.BOTTOM PLATE TO RIM (BRACED WALLS), FACE NAIL 2-16d 16.TOP/BOTTOM PLATE TO STUD, TOENAIL 4-8d TOP/BOTTOM PLATE TO STUD, END NAIL 2-16d 17.TOP PLATE LAPS AT CORNERS/INTERSECTIONS, FACE NAIL 2-16d 18.1" BRACE TO EACH STUD AND PLATE, FACE NAIL 2-8d 19.1X6 SHEATHING TO BEARING, FACE NAIL 2-8d 20.1X8 SHEATHING TO BEARING, FACE NAIL 3-10d 21.JOIST TO SILL/TOP PLATE/GIRDER, TOE NAIL 3-8d 22.RIM/BAND JOIST OR BLK'G TO SILL/TOP PLATE, TOE NAIL 8d COMMON @ 6" O.C. 8d BOX @ 4" O.C. 23.1X6 SUBFLOOR TO EACH JOIST, FACE NAIL 2-8d 24.2" SUBFLOOR TO JOIST OR GIRDER, FACE NAIL 2-16d 25.2" PLANKS 2-16d AT EACH BEARING 26.BAND/RIM JOIST TO JOIST, END NAIL 3-16d 27.BUILT-UP GIRDERS AND BEAMS FACE NAIL 2-20d AT ENDS & SPLICE 28.LEDGER STRIP SUPPORTING JOISTS, FACE NAIL 3-16d 29.BRIDGING TO JOIST, TOE NAIL 2-10d CONNECTION NAILING NOTES: 1. COMMON NAILS SHALL BE USED (U.N.O.) 2.JOIST CAN BE EITHER SAWN LUMBER OR I-JOIST PER PLAN NAILING SCHEDULE STRUCTURAL NOTES SOIL SOIL REPORT BY GEOTECHNICAL INTERNATIONAL LAN AND ASSOCIATES 13139 HARBOR BOULEVARD, GARDEN GROVE, CA 92843 PHONE:714 - 414 9215 PROJECT NO.: SA-12-04-25 DATE: 04/02/2025 SOIL ENGINEER: LAN PHAM SOIL BEARING PRESSURE 1500 PSF 5" CONCRETE SLAB ON GRADE W/ #4 @ 12" O.C. E.W. CENTERED IN SLAB OVER 10 MIL VISQUEEN OVER 4" OF 1/2" OR LARGE CLEAN AGGREGATE. 7 SD1 C 8'-0" B 8'-0" A 7'-4" C 4' - 9 " A 8' - 0 " C 8' - 0 " HD U 2 5 SD1 HD U 2 5 SD13 SD1 3 SD1 HDU4 5 SD1 HDU4 5 SD1 HD U 2 5 SD1 3 SD1 HD U 2 5 SD1 HD U 4 5 SD1 3 SD1 HD U 4 5 SD1 HD U 2 5 SD1 HD U 4 5 SD1 HDU2 5 SD1 HDU4 5 SD1 4 SD1 4 SD1 3 SD1 4x6 HDR 4x6 HDR 4x6 HDR 4x6 HDR 4x6 HDR4x6 HDR 4x6 HDR 4x 6 H D R 4x 6 H D R 4x 6 H D R 4x 6 H D R 4x 6 H D R DR A G J O I S T 2x10 RIDGE BOARD 2x10 RIDGE BOARD 3 SD2 2x 6 R . R . @ 1 6 " o . c . 2x 6 R . R . @ 1 6 " o . c . 2x 6 R . R . @ 1 6 " o . c . 2x 6 R . R . @ 1 6 " o . c . 2x 8 C . J . @ 1 6 " o . c . 4x6 HDR 4x10 CLG BM4x10 CLG BM C 8'-0" 1 SD2 4x 4 4x 4 B 8'-0" 1 SD2 4x 4 4x 4 A 7'-4" 1 SD2 4x 4 4x 4 C 4' - 9 " 2 SD2 4x4 4x4 DR A G J O I S T 3 SD2 2x 8 C . J . @ 1 6 " o . c . 4x4 K.P. 4x 4 A 8' - 0 " 2 SD2 4x4 4x4 C 8' - 0 " 15 SD2 4x4 4x 4 2x6 R.R. @ 16" o.c. 4x4 11 SD211 SD2 12 SD213 SD2 14 SD2 1 SD2 10 SD2 6x6 DRP BM 6x6 DRP BM 4x4 16 SD2 4x4 16 SD2 16 SD2 1 2 2 SD2 S1 Job # Sheet No.: Scale Date Pl a n C h e c k # : __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ SEAL: SHEET DESCRIPTION : 02/10/2025 S24212 DE T A C H E D A D U 11 2 8 E L A I N E D R . , SA N T A A N A , C A 9 2 7 0 3 Pr o j e c t f o r : REFER TO DETAILS 5/SD1 FOR INSTALLATION OF HOLDOWNS. REFER TO S.0 SHEET FOR MORE INFO. FOUNDATION NOTES 2. 1. FOUNDATION ANCHOR BOLTS IN CONTACT WITH PRESSURE TREATED SILL PLATE SHALL BE OF HOT DIPPED ZINC-COATED GALVANIZED STEEL, STAINLESS STEEL, SILICON BRONZE OR COPPER. 3. CONTRACTOR SHALL VERIFY ALL EXISTING FOOTINGS AND NOTIFY TO ENG. OF RECORD FOR ALL DISCREPANCIES. 4. HOLDOWN ANCHORS SHALL BE RE-TIGHTENED JUST PRIOR TO COVERING THE WALL FRAMING. 5. ALL HOLDOWN ANCHORS SHALL BE TIED IN PLACE PRIOR TO CALLING FOUNDATION INSPECTION. 6. SEE DETAIL 9/SD2 FOR PLATE NOTCHING & BORING. FOR PIPING THRU SILL & TOP PLATES OF SHEAR WALLS. 7. SCALE: FOUNDATION PLAN 1/4" = 1'-0" FRAMING NOTES: CLEAR SPAN, L L ≤ 6'-0"6'-0" < L ≤ 10'-0" L ≥ 10'-0" 2 x 4 2-2 x 4 2-2X4 U.N.O. PER PLAN FOUNDATION & FRAMING PLAN REBAR DETAIL SHEET NUMBERSDX X DETAIL NUMBER FOUNDATION LEGEND: FOOTING / SLAB FRAMING LEGEND: X X'-X" X SDX X CONSTRUCTION KEY NOTES:X 1 2 3 4 5 DESCRIPTION MATERIAL SIZE EDGE NAILING 1,2 FIELD 6 8d 10d 6" 6" 4" 12" 12" 12" 6"12" 8" 10" 48" 36" 24" SHEAR WALL SCHEDULE FOOTNOTES: 1.ALL NAILS TO BE COMMON NAILS. 2.SOLID BLOCKING SHALL BE PROVIDED AT ALL EDGES AND HORIZONTAL JOINTS. 3.SHT'G APPLIED TO BOTH SIDES SHALL BE OFFSET OR FRAMING SHALL BE 3X AND NAILS ON EACH SIDE SHALL BE STAGGERED. 4.STAGGER NAILS 1/2" & SHT'G. ONE SIDE ONLY. 5.SHEETS SHALL NOT BE LESS THAN 4FT X 8FT, EXCEPT AT BOUNDARIES AND CHANGES WHERE SHEET SHALL BE 24" MINIMUM. 6.SQUARE PLATE WASHERS SHALL BE USED WITH ALL ANCHOR BOLTS. 2X4 WALL: 3" X 3" X 0.229" 2X6 WALL: 4-1/2" SQ. X .229" 12"6"16" LTP4 OR A35 16" 12" 10" 8" P 8d 6"12"6"16"--32" 12"--4"12"6" 4" 3/8" PLYWD/OSB, STRUCT. I W/ 8d @ 6", 12", BLOCKED 15/32" PLYWD/OSB, STRUCT. I W/ 10d @ 6", 12", BLOCKED 15/32" PLYWD/OSB, STRUCT. I W/ 10d @ 4", 12", BLOCKED 15/32" PLYWD/OSB, STRUCT. I W/ 10d @ 3", 12", BLOCKED 15/32" PLYWD/OSB, STRUCT. I W/ 10d @ 2", 12", BLOCKED SIMP. SDS 1/4"Ø X 6"16d A.B.'S 5/8" SEISMIC & WIND VALUE CONFORMING TO ANSI/AF&PA, SDPWS-2018/CBC 2022 3" STAGG. 2" STAGG. PANEL JOINT SILL 2X 2X 2X 2X 2X 2X 2X 2X SILL TO RIM/BLK'G RIM/BLK'G TO TOP PLATE SILL TO FOUND. A B C D E 10d 10d 10d X FRAMING 3" STAGG. 2" STAGG. 2,5 4 4 4 4 72" 2X 3X 3X 3X 200 / 280 plf 340 / 476 plf 665 / 931 plf 870 / 1218 plf 510 / 714 plf 3/8" CDX (EXTERIOR NON-SHEARWALL) SCALE: ROOF FRAMING PLAN 1/4" = 1'-0" 2 3-31-233-31-253/31/273/31/27 10/21/2025 SD1 Job # Sheet No.: Scale Date Pl a n C h e c k # : __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ SEAL: SHEET DESCRIPTION : 02/10/2025 S24212 DE T A C H E D A D U 11 2 8 E L A I N E D R . , SA N T A A N A , C A 9 2 7 0 3 Pr o j e c t f o r : FOUNDATION DETAILS SINGLE LAYER INTERSECTION & CORNER L L L L L L L L L L = 30 BAR DIAM. MIN. IN CONCRETE. 40 BAR DIAM. MIN. IN MASONRY. DOUBLE LAYER INTERSECTION & CORNER CONCRETE FOOTING INTERSECTION REINF. MAY BE CONT. OR ADD BARS WITH SAME SIZE & SPACING AS WALL/FOOTING REINF. BEND LAP SPLICE STIRRUP TIE OR HOOK NOTES: CROSSTIE WIRE TIE END D D 90° BEND R 180° BEND R12 " 4 db 2 1 2" MIN. 6 d b 4" M I N . 6db 3" M I N . * INCREASE LENGTH BY 30% FOR TOP BARS (HORIZONTAL BARS SO PLACED THAT MORE THAN 12" OF FRESH CONC. IS CAST IN THE MEMBER BELOW, EXCLUDE WALLS) DE T A I L I N G DI M E N S I O N DE T A I L I N G DI M E N S I O N 6 d b 4" M I N . 12 d b F O R # 6 T H R U # 8 3" M I N " D= 4db FOR #3 THRU #5 D= 6db FOR #6 THRU #8 8db 8db 48 db R= 3db FOR #3 THRU #8 R= 4db FOR #9 THRU #11 R= 5db FOR #14 THRU #18 1.PUT CROSSTIE W/ EACH STIRRUP ALT. 135° BENDS (90° FOR CIRCULAR TIE) 2.ALL BENDS SHALL BE MADE COLD TYP. REBAR DETAIL 24 " 15" 1.CONCRETE SLAB ON GRADE PER PLAN 2.CONT. REBAR PER FOOTING SCHEDULE ON DETAIL 3 3.2X STUD PER PLAN 4.3x P.T.D.F. SILL PLATE W/ A.B. @ 48" O.C OR SEE SHEAR WALL SCHEDULE, USE SHOT PINS AS PER GENERAL NOTES FOR NON- SHEAR WALLS. NOTES: - SEE DETAIL #3 FOR LEGEND & INFORMATION NOT SHOWN. 2 1 3 4 7" M I N . INTERIOR FOOTING DETAIL D W 2" MI N . PORCH SLAB SLOPE TO DRAIN 6" MIN. F.G. 6" MI N . NOTE: INFORMATION NOT SHOWN. SEE DETAIL #3 FOR LEGEND AND FACE OF STUDS #3 X 24" DOWELS @ 24" O.C. HOUSE FOOTING TO PORCH SLAB NOTE: SEE DETAIL #3 FOR LEGEND & INFORMATION NOT SHOWN CONC. SLAB SHOT PIN SEE SHEET S-0 NON-BEARING INTERIOR WALL SO I L : 8 " M I N . CO N C . : 4 " M I N . 15" 7" MI N . EM B E D 1.2X STUD WALL 2.SHEAR WALL AS OCCURS, SEE PLAN AND SHEAR WALL SCHEDULE 3.P.T.D.F. SILL PLATE W/ 5/8"Ø ANCHOR BOLTS PER SHEAR WALL SCHEDULE, (2) BOLTS PER PIECE WITH (1) BOLT LOCATED NOT MORE THAT 12" OR LESS THAN 7db. FROM EACH END AND/OR SPLICE OF THE PIECE. 4.(2) #5 BARS, TOP AND BOTTOM 5.#3 DOWELS @ 18" O.C. FOR 2 POURS 6.SLAB PER PLAN 7.SUBGRADE AND VAPOR BARRIER PER PLAN 8.SCREED @ STUCCO FINISH 24 " 1 2 3 4 6 5 7 8 7" FO R 2 PO U R S ON L Y FOOTING DETAIL HDU 5" MIN. 16 " MI N . RE T U R N 3" CL R . le 1 3/4" MIN. E E le 18" 18 " 1.REBAR PER TABLE, CENTERED @ "HD" (BEND REBAR @ CORNER). FOR COND. B, LOCATE TOP REBAR 3" TO 5" FROM TOP OF CONCRETE. 2.EDGE OF DEEPENED SLAB/FTG FOR HOLDOWN @ INT. SHEAR WALL. 3.CONCRETE STEM/FOOTING WIDTH (8" MIN. FOR 7/8"Ø BOLT, 6" MIN. FOR 5/8"Ø BOLT) ENTIRE EMBED. LENGTH. 4.SS BOLTS PER SCHEDULE. 5.FTG WIDTH (13" FOR 7/8"Ø BOLT, 9" FOR 5/8"Ø BOLT). 6.EXTERIOR FOOTING EDGE. 7.CONCRETE CORNER. 8.CONCRETE END. 9.DEEPEND FOOTING AS REQUIRED TO ENSURE PROPER EMBEDMENT 10.USE 16D SINKER NAILS. (0.148"X3 1/4"). NOTES: - SEE PLANS FOR HOLDOWN TYPES. - SEE DETAIL #1 FOR LEGEND & INFORMATION NOT SHOWN. - REFER TO MANUFACTURER SPECIFICATIONS FOR INSTALLATION INFORMATION NOT SHOWN. - WHEN 3-2X MEMBER IS USED FOR HDQ8 & HDU, 1/4"Øx4 1/2" SDS SCREWS SHOULD BE USED. SIMPSON HOLDOWN SB BOLTS #4 BAR X 8'-0" CENTERED @ HD*le (in.) IN LIEU OF #4 USE #5 BAR X 8'-0" CENTERED @ HD * HDU2 SS5/8x24 (2) TOP & BOT.(1) TOP & (1) BOT. HDU4 (2) TOP & BOT.(1) TOP & (1) BOT. HDU5 / HTT5 (2) TOP & BOT.(1) TOP & (1) BOT. HDU8 / HDQ8 (2) TOP & BOT.(1) TOP & (1) BOT. *CONT. FOOTING REINFORCEMENT CAN BE COUNTED AS PART OF REBAR REQUIREMENT IF BAR SIZE ARE SAME AS THOSE REQUIRED PER SCHEDULE; OTHERWISE, BARS PER SCHEDULE ARE ADDITIONAL. SB BOLTS INSTALLATION @ SW @ EXT. FOOTING SB BOLT INSTALLATION @ SW @ INT. FTG/SLAB PLAN VIEW SB @ CONC. CORNER PLAN VIEW SB @ CONC. END 1 2 5 3 4 9 6 4 1 7 4 8 5" MIN. 3" CL R . 24" NOTES: -4x4 POSTS CAN BE REPLACED W/ 2-2x4 AS LONG AS NAILS ARE MAINTAINED W/ MIN. EDGE DISTANCE AS REQUIRED BY THE MANUF. SPEC. & S.W. EDGE NAILS STAGGERED ON BOTH STUDS. -FOR NON-MONOPOUR FOUNDATIONS, USE (2) #5 DOWELS PER EACH SB BOLT, PLACED WITHIN 2" FROM THE BOLT. HOLD DOWN 8"8" E-E SECTION le 3" CL R . 9 9 SS5/8x24 SS5/8x24 SS7/8x24 24" 24" 24" 3-31-233-31-253/31/273/31/27 10/21/2025 SD2 Job # Sheet No.: Scale Date Pl a n C h e c k # : __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ SEAL: SHEET DESCRIPTION : 02/10/2025 S24212 DE T A C H E D A D U 11 2 8 E L A I N E D R . , SA N T A A N A , C A 9 2 7 0 3 Pr o j e c t f o r : FRAMING DETAILS SHEAR TRANSFER 5 6 3 8 1 4 7 B.N. 2 5 6 3 8 1 4 7 B.N. 2 9 PARALLELPERPENDICULAR 1.RAFTER PER PLAN 2.ROOF SHEATHING 3.LTP4 @ 48" O.C. OR SEE SHEAR WALL SCHEDULE 4.SHEAR WALL AS OCCURS 5.(8) 10d NAILS 6.DBL. TOP PLATE 7.BEAM AS OCCURS 8.CEILING JOIST PER PLAN 9.CS14 W/ 2X BLK'G FOR 4 BAY MIN, U.N.O. B.N . B.N . RIDGE SHEAR TRANSFER B.N . B.N . RIDGE BOARD RIDGE BEAM LSTA30 @ 32" O.C.LSTA30 @ 32" O.C. A35 @ EA JOIST A35 @ EA JOIST LUS LUS ROOF JOIST ROOF JOIST RIDGE BOARD ROOF JOIST ROOF JOIST RIDGE BEAM SIMPSON "DTC" @ 48" OC MAX. 2X BLK'G. @ 48" O.C. W/ (3) 16d'S @ EA. END JOIST OR TRUSS BOTT. CHORD 14" C L R . 14" C L R . NON-BRG. WALL NON BEARING WALL TYP. AT RIDGE 3 3 NAILS SHALL BE STAGGERED & AT LEAST 2 1/4" APART. SINKER OR 10d COMMON FULLY NAIL STRAP W/ 16d NOTE: - - 4'-0" LAP MIN. 1 1.MIN. TWO ROWS 16d's, TOTAL (24) 16d's @ TYP. PLATE SPLICES OR BREAKS. 2.MSTA36. 3.LOCATE STUD UNDER SPLICE OR PROVIDE 2X BLKG. ATTACHED TO ADJACENT STUDS W/ (3) 16d'S EACH SIDE. 4.PLATE TO STUD NAILING PER C.B.C. MIN. REQUIREMENTS. 2 4 TOP PLATE SPLICE TYP. No BLOCKING, E.N. E.N.(E.N.) PER PLAN CONTINUOUS PANEL EDGE (E.N.) PER PLAN PANEL BOUNDARY & BOUNDARY NAILING (B.N.) PER PLAN DISCONTINUOUS PANEL EDGE, NOTE: - STAGGER JOINTS AS SHOWN - MIM. SIZE OF SHEET SHALL BE 2 FT. X 2 FT. - NAILS SHALL BE DRIVEN TIGHT BUT SHALL NOT FRACTURE SURFACE OF SHEATHING - TOLERANCE ON NAILING SHALL BE 3/4" W/ THE AVERAGE NAIL SPACING OVER ANY 4 FT. LENGTH BEING AT LEAST THAT NOTED ON THE PLAN PER PLAN DIRECTION OF FACE GRAIN PERPENDICULAR TO SUPPORT FRAMING @ 24" O.C.. SHOWN (16" O.C.. SIMILAR) PANEL BOUNDRY & BOUNDARY NAILING (B.N.) FIELD NAILING PLYWOOD SHEATHING LAYOUT NOTCH SIMP. "MSTA36" W/ (11) 10d COMMONS EA. END (STRAP NOT REQ.'D @ SILL PLT.) BORED HOLE NOTE: ONLY ONE NOTCH OR HOLE ALLOWED PER EACH STUD. (EXCLUDING LET-IN BRACES). NOTCHES BORED HOLES 2-2X TOP PLT. 2X OR 3X SILL PLT. 2x4 2x6 2x8 6' 6' 6' MIN. SPACING "L" MAX.MAX. "W" 3-1/2" 5-1/2" 5-1/2" 1-1/2" 2" 3" 2" 3" 1-1/4" 12" MIN.12" MIN. 'L' MAX. EQ . EQ . 'W ' MA X . PLATE NOTCHING AND BORING 2'-0" MIN. PANEL WIDTH EDGE NAIL (E.N.) SHEAR PANEL TO ALL PANEL EDGES SHEAR WALL INDICATED TO SHEAR WALL SCHEDULE WALL SCHEDULE TRIMMER WHERE OCCURS FIELD NAIL @ 12" O.C. KING STUD OR POST PER PLAN. EDGE NAIL (E.N.) SHEAR PANEL TO POST INSTALL HOLDOWN ON KING STUD OR POST W/ EDGE NAILINGNOTES: 1. PROVIDE 3 8" EDGE DISTANCE FOR NIALS; 2. PROVIDE MIN. 2X BLK'G. @ ALL PLYWOOD EDGES OR AS NOTED IN SHEAR SCHEDULE; 3. STAGGER NAILS THAT ARE SPACED 2" O.C.; 4. FOR SPECIFIC SHEARWALL CONDITIONS SEE PLAN & SCHEDULE; 5. NO CUTS OR HOLES IN SHEATHING WITHIN 16" OF CORNERS; 6. MAX. ACCUMULATED LENGTH OF OPENINGS SHALL NOT EXCEED 20% OF THE WALL LENGTH. MAX. LENGTH OF EA. OPENING IS 4-12" IN ANY DIRECTION. BY ON PLAN REFERS SHEAR PANEL 3 8" TYP. C PANEL JOINTL LC NAIL SHT'G. 2x4 W 16d'S @ 12" O.C. JOIST OFFSET EDGE SUPPORT OFFSET EDGE SUPPORT 2x4 FLAT W/ (2) - 10d @ EACH END C PANEL JOINTL C NAILL SHT'G BLOCKING AT EDGE SUPPORT CEILING JOIST W/ STRAPS CEILING BM COND. WALL COND. 1.CEILING BEAM PER PLAN. 2.CEILING JOISTS SEE PLAN. 3.LUS HANGER. 4.ST18 EA. CEILING JOIST. 5.2X6 BLOCKING. 6.(6) 16d AT OVERLAP JOIST. 7.DOUBLE TOP PLATE. 8.STUD WALL PER PLAN. 9.CEILING (COLLAR) TIES AT EA. RAFTER. 10.RAFTER SEE PLAN. 11.RAFTER/ CEILING CONN. SEE DETAIL 2/SD2. 12.CEILING LAP & BREAK AT BEAM SEE CONN. DETAIL. WD BM 2-A35 BOTTOM 2-A35 TOP 4XPOST W/ HEADER CONNECTION DETAIL WD POST WD BEAM SIMPSON ECCQ OR BEAM CONNECTION DETAIL SIMPSON CCQ SHEAR TRANSFER 1.RAFTER PER PLAN 2.(2) 16d 3.SIMP. A34 4.2X BLK'G 5.ROOF SHEATHING 6.FLAT 2X4 @ 24" O.C. 7.DBL. TOP PLATE 8.(2) 16d 9.FASCIA BOARD 10.LTP4 (OR A35) SEE SHEAR WALL SCHEDULE 11.DBL. RAFTER 12.STRUT @ 48" O.C. W/ A34 TO TOP PLATE AND RAFTER MAX LENGTH: 2X 6'-0" 4X 14'-0" 13.MATCH SHEAR WALL BELLOW 14.2X STUD 15.2X BLK'G 16.CEILING JOIST PER PLAN 17.DBL. TOP PLATE OR BEAM 18.SHEAR WALL PER PLAN 19.RIM JOIST 20.2X BLK'G WITH BOUNDARY NAILING 12 4 14 6 2 8 B.N.B.N. E. N . 16 1 7 17 E. N . 10 18 13 X 9 19 5 3 18" MIN. 20 2 10 45 °MA X . 11 20 20 BEAM AT WALL END 1 5 6 2 1 5 6 2 4 4 1.BEAM PER PLAN 2.DBL. TOP PLATE 3.2X STUD W/ 16d @ 12" O.C. 4.SIMPSON EPC, U.N.O. 5.POST PER PLAN 6.2X STUD 3 3 SHEAR TRANSFER 1.RAFTER PER PLAN 2.(2) 16d 3.SIMP. A34 4.2X BLK'G 5.ROOF SHEATHING 6.FLAT 2X4 @ 24" O.C. 7.DBL. TOP PLATE 8.(2) 16d 9.FASCIA BOARD 10.LTP4 (OR A35) SEE SHEAR WALL SCHEDULE 11.DBL. RAFTER 12.STRUT @ 48" O.C. W/ A34 TO TOP PLATE AND RAFTER MAX LENGTH: 2X 6'-0" 4X 14'-0"MATCH 13.SHEAR WALL BELLOW 14.2X STUD 15.2X BLK'G @ 48" O.C. 16.CEILING JOIST PER PLAN 17.DBL. TOP PLATE OR BEAM 18.SHEAR WALL PER PLAN 19.RIM JOIST 20.2X BLK'G WITH BOUNDARY NAILING 21.2X LEDGER W/ (2) 1 4" LAG SCREWS @ 16" O.C., MIN. 2.5 EMBEDMENT 12 4 14 6 2 8 B.N.B.N. E. N . 16 1 7 17 E. N . 10 18 13 X 9 19 5 3 18" MIN. 20 2 10 45 °MA X . 11 20 20 5 1 2 15 21 1.CEILING JOIST 2.DBL. TOP PLATE 3.SHEARWALL PER PLAN 4.2X BLK'G 5.2X STUD @ 16" O.C. 6.RAFTER PER PLAN 7.WALL SHEATHING, SAME AS BELOW 8.FASTENER & SILL PER SHEARWALL SCHEDULE. 9.SIMP A35 @ 16" O.C. 10.ROOF SHEATHING 11.SIMP A35 @ 16" O.C. 12.2X BLK'G @ 48" O.C., BOTH SIDES OF COLLECTOR BEAM B. N . B. N . B. N . B.N. 5 2 9 9 8 7 10 5 4 3 6 1 SHEAR TRANSFER 12 12 6 B. N . B.N. 9 6 4 PERPENDICULAR RAFTERS PARALLEL RAFTERS PLATELINE L 48" MAX. L 2' - 1 " AWING BRACE 1.2X STUD 2.6X6 3.(6) 3/8" LAG SCREW @ 5" O.C. W/ 1.5" x 1.5" x 1/8" PLATES, 3" MIN. EMBEDMENT TO POST 4.SIMP. HUC66 5.(2) SIMP. KBS1Z 6.SIMP. ECPZ6 7.POST PER PLAN 8.BEAM PER PLAN 9.RAFTER PER PLAN 10.LEDGER PER PLAN, (3) 1/4" SDS WOOD SCREWS PER STUD, 2.5" MIN. EMBEDMENT 11.SIMP. LUS 12.SIMP. A34 W/ #9 SDS SCREWS 13.SIMP. H2.5A 14.SIMP A34 15.2x BLK'G 16.SIMP. A34, EACH SIDE OF POST, TOP AND BOT. OF POST 8' - 0 " 45° 6" MI N . 1 2 3 4 2 2 5 6 7 8 9 10 11 12 13 14 15 16 16 2 NE W D E T A C H E D A D U 11 2 8 E L A I N E D R ( A D U ) , SA N T A A N A , C A 9 2 7 0 3 Job # Sheet No.: Scale Date Pr o j e c t f o r : SEAL: SHEET DESCRIPTION : 10/14/25 24212 OW N E R : EN G I N E E R : DI E M L E & T A O P H A M 11 2 6 E L A I N E D R , SA N T A A N A , C A 9 2 7 0 3 71 4 - 6 0 0 - 7 7 8 1 N1 CAL GREEN REQUIREMENTS CHAPTER 4 RESIDENTIAL MANDATORY MEASURES DIVISION 4.1 PLANNING AND DESIGN DIVISION 4.3 WATER EFFICIENCY AND CONSERVATION 4.406 ENHANCED DURABILITY AND REDUCED MAINTENANCE 4.406.1 RODENT PROOFING. Annular spaces around pipes, electric cables, conduits or other openings in sole/bottom plates at exterior walls shall be protected against the passage of rodents by closing such openings with cement mortar, concrete masonry or a similar method acceptable to the enforcing agency. 4.408 CONSTRUCTION WASTE REDUCTION, DISPOSAL AND RECYCLING 4.408.1 CONSTRUCTION WASTE MANAGEMENT. Recycle and/or salvage for reuse a minimum of 65 percent of the non-hazardous construction and demolition waste in accordance with either Section 4.408.2, 4.408.3 or 4.408.4, or meet a more stringent local construction and demolition waste management ordinance. Exceptions: 1. Excavated soil and land-clearing debris. 2. Alternate waste reduction methods developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist or are not located reasonably close to the jobsite. 3. The enforcing agency may make exceptions to the requirements of this section when isolated jobsites are located in areas beyond the haul boundaries of the diversion facility. 4.408.2 CONSTRUCTION WASTE MANAGEMENT PLAN. Submit a construction waste management plan in conformance with Items 1 through 5. The construction waste management plan shall be updated as necessary and shall be available during construction for examination by the enforcing agency. 1. Identify the construction and demolition waste materials to be diverted from disposal by recycling, reuse on the project or salvage for future use or sale. 2. Specify if construction and demolition waste materials will be sorted on-site (source separated) or bulk mixed (single stream). 3. Identify diversion facilities where the construction and demolition waste material collected will be taken. 4. Identify construction methods employed to reduce the amount of construction and demolition waste generated. 5. Specify that the amount of construction and demolition waste materials diverted shall be calculated by weight or volume, but not by both. 4.408.3 WASTE MANAGEMENT COMPANY. Utilize a waste management company, approved by the enforcing agency, which can provide verifiable documentation that the percentage of construction and demolition waste material diverted from the landfill complies with Section 4.408.1. Note: The owner or contractor may make the determination if the construction and demolition waste materials will be diverted by a waste management company. 4.408.4 WASTE STREAM REDUCTION ALTERNATIVE [LR]. Projects that generate a total combined weight of construction and demolition waste disposed of in landfills, which do not exceed 3.4 lbs./sq.ft. of the building area shall meet the minimum 65% construction waste reduction requirement in Section 4.408.1 4.408.4.1 WASTE STREAM REDUCTION ALTERNATIVE. Projects that generate a total combined weight of construction and demolition waste disposed of in landfills, which do not exceed 2 pounds per square foot of the building area, shall meet the minimum 65% construction waste reduction requirement in Section 4.408.1 4.408.5 DOCUMENTATION. Documentation shall be provided to the enforcing agency which demonstrates compliance with Section 4.408.2, items 1 through 5, Section 4.408.3 or Section 4.408.4.. Notes: 1. Sample forms found in "A Guide to the California Green Building Standards Code (Residential)" located at www.hcd.ca.gov/CALGreen.html may be used to assist in documenting compliance with this section. 2. Mixed construction and demolition debris (C & D) processors can be located at the California Department of Resources Recycling and Recovery (CalRecycle). 4.410 BUILDING MAINTENANCE AND OPERATION 4.410.1 OPERATION AND MAINTENANCE MANUAL. At the time of final inspection, a manual, compact disc, web-based reference or other media acceptable to the enforcing agency which includes all of the following shall be placed in the building: 1. Directions to the owner or occupant that the manual shall remain with the building throughout the life cycle of the structure. 2. Operation and maintenance instructions for the following: a. Equipment and appliances, including water-saving devices and systems, HVAC systems, photovoltaic systems, electric vehicle chargers, water-heating systems and other major appliances and equipment. b. Roof and yard drainage, including gutters and downspouts. c. Space conditioning systems, including condensers and air filters. d. Landscape irrigation systems. e. Water reuse systems. 3. Information from local utility, water and waste recovery providers on methods to further reduce resource consumption, including recycle programs and locations. 4. Public transportation and/or carpool options available in the area. 5. Educational material on the positive impacts of an interior relative humidity between 30-60 percent and what methods an occupant may use to maintain the relative humidity level in that range. 6. Information about water-conserving landscape and irrigation design and controllers which conserve water. 7. Instructions for maintaining gutters and downspouts and the importance of diverting water at least 5 feet away from the foundation. 8. Information on required routine maintenance measures, including, but not limited to, caulking, painting, grading around the building, etc. 9. Information about state solar energy and incentive programs available. 10. A copy of all special inspections verifications required by the enforcing agency or this code. 11. Information from the Department of Forestry and Fire Protection on maintenance of defensible space around residential structures. 12. Information and/or drawings identifying the location of grab bar reinforcements. 4.410.2 RECYCLING BY OCCUPANTS. Where 5 or more multifamily dwelling units are constructed on a building site, provide readily accessible area(s) that serves all buildings on the site and are identified for the depositing, storage and collection of non-hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waster, and metals, or meet a lawfully enacted local recycling ordinance, if more restrictive. Exception: Rural jurisdictions that meet and apply for the exemption in Public Resources Code Section 42649.82 (a)(2)(A) et seq. are note required to comply with the organic waste portion of this section. DIVISION 4.4 MATERIAL CONSERVATION AND RESOURCE EFFICIENCY DIVISION 4.5 ENVIRONMENTAL QUALITY 4.303 INDOOR WATER USE 4.303.1 WATER CONSERVING PLUMBING FIXTURES AND FITTINGS. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the sections 4.303.1.1, 4.303.1.2, 4.303.1.3, and 4.303.4.4. Note: All noncompliant plumbing fixtures in any residential real property shall be replaced with water-conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of a certificate of final completion, certificate of occupancy, or final permit approval by the local building department. See Civil Code Section 1101.1, et seq., for the definition of a noncompliant plumbing fixture, types of residential buildings affected and other important enactment dates. 4.303.1.1 Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush. Tank-type water closets shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for Tank-type Toilets. Note: The effective flush volume of dual flush toilets is defined as the composite, average flush volume of two reduced flushes and one full flush. 4.303.1.2 Urinals. The effective flush volume of wall mounted urinals shall not exceed 0.125 gallons per flush. The effective flush volume of all other urinals shall not exceed 0.5 gallons per flush. 4.303.1.3 Showerheads. 4.303.1.3.1 Single Showerhead. Showerheads shall have a maximum flow rate of not more than 1.8 gallons per minute at 80 psi. Showerheads shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for Showerheads. 4.303.1.3.2 Multiple showerheads serving one shower. When a shower is served by more than one showerhead, the combined flow rate of all the showerheads and/or other shower outlets controlled by a single valve shall not exceed 1.8 gallons per minute at 80 psi, or the shower shall be designed to only allow one shower outlet to be in operation at a time. Note: A hand-held shower shall be considered a showerhead. 4.303.1.4 Faucets. 4.303.1.4.1 Residential Lavatory Faucets. The maximum flow rate of residential lavatory faucets shall not exceed 1.2 gallons per minute at 60 psi. The minimum flow rate of residential lavatory faucets shall not be less than 0.8 gallons per minute at 20 psi. 4.303.1.4.2 Lavatory Faucets in Common and Public Use Areas. The maximum flow rate of lavatory faucets installed in common and public use areas (outside of dwellings or sleeping units) in residential buildings shall not exceed 0.5 gallons per minute at 60 psi. 4.303.1.4.3 Metering Faucets. Metering faucets when installed in residential buildings shall not deliver more than 0.2 gallons per cycle. 4.303.1.4.4 Kitchen Faucets. The maximum flow rate of kitchen faucets shall not exceed 1.8 gallons per minute at 60 psi. Kitchen faucets may temporarily increase the flow above the maximum rate, but not to exceed 2.2 gallons per minute at 60 psi, and must default to a maximum flow rate of 1.8 gallons per minute at 60 psi. Note: Where complying faucets are unavailable, aerators or other means may be used to achieve reduction. 4.303.1.4.5 Pre-rinse spray valves. When installed, shall meet the requirements in the California Code of Regulations, Title 20 (Appliance Efficiency Regulations), Sections 1605.1 (h)(4) Table H-2, Section 1605.3 (h)(4)(A), and Section 1607 (d)(7) and shall be equipped with an integral automatic shutoff. FOR REFERENCE ONLY: The following table and code section have been reprinted from the California Code of Regulations, Title 20 (Appliance Efficiency Regulations),Section 1605.1 (h)(4) and Section 1605.3 (h)(4)(A). Title 20 Section 1605.3 (h)(4)(A): Commercial prerinse spray values manufactured on or after January 1, 2006, shall have a minimum spray force of not less than 4.0 ounces-force (ozf)[113 grams-force(gf)] 4.303.2 Submeters for multifamily buildings and dwelling units in mixed-used residential/commercial buildings. Submeters shall be installed to measure water usage of individual rental dwelling units in accordance with the California Plumbing Code. 4.303.3 Standards for plumbing fixtures and fittings. Plumbing fixtures and fittings shall be installed in accordance with the California Plumbing Code, and shall meet the applicable standards referenced in Table 1701.1 of the California Plumbing Code. TABLE - MAXIMUM FIXTURE WATER USE FIXTURE TYPE FLOW RATE SHOWER HEADS (RESIDENTIAL)1.8 GMP @ 80 PSI LAVATORY FAUCETS (RESIDENTIAL)MAX. 1.2 GPM @ 60 PSI MIN. 0.8 GPM @ 20 PSI LAVATORY FAUCETS IN COMMON & PUBLIC USE AREAS 0.5 GPM @ 60 PSI KITCHEN FAUCETS 1.8 GPM @ 60 PSI METERING FAUCETS 0.2 GAL/CYCLE WATER CLOSET 1.28 GAL/FLUSH URINALS 0.125 GAL/FLUSH 4.304 OUTDOOR WATER USE 4.304.1 OUTDOOR POTABLE WATER USE IN LANDSCAPE AREAS. Residential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resources' Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent. NOTES: 1. The Model Water Efficient Landscape Ordinance (MWELO) is located in the California Code Regulations, Title 23, Chapter 2.7, Division 2. MWELO and supporting documents, including water budget calculator, are available at: https://www.water.ca.gov/ ABBREVIATION DEFINITIONS: HCD Department of Housing and Community Development BSC California Building Standards Commission DSA-SS Division of the State Architect, Structural Safety OSHPD Office of Statewide Health Planning and Development LR Low Rise HR High Rise AA Additions and Alterations N New NOTE: THIS TABLE COMPILES THE DATA IN SECTION 4.303.1, AND IS INCLUDED AS A CONVENIENCE FOR THE USER. SECTION 4.102 DEFINITIONS 4.102.1 DEFINITIONS The following terms are defined in Chapter 2 (and are included here for reference) FRENCH DRAIN. A trench, hole or other depressed area loosely filled with rock, gravel, fragments of brick or similar pervious material used to collect or channel drainage or runoff water. WATTLES. Wattles are used to reduce sediment in runoff. Wattles are often constructed of natural plant materials such as hay, straw or similar material shaped in the form of tubes and placed on a downflow slope. Wattles are also used for perimeter and inlet controls. 4.106 SITE DEVELOPMENT 4.106.1 GENERAL. Preservation and use of available natural resources shall be accomplished through evaluation and careful planning to minimize negative effects on the site and adjacent areas. Preservation of slopes, management of storm water drainage and erosion controls shall comply with this section. 4.106.2 STORM WATER DRAINAGE AND RETENTION DURING CONSTRUCTION. Projects which disturb less than one acre of soil and are not part of a larger common plan of development which in total disturbs one acre or more, shall manage storm water drainage during construction. In order to manage storm water drainage during construction, one or more of the following measures shall be implemented to prevent flooding of adjacent property, prevent erosion and retain soil runoff on the site. 1. Retention basins of sufficient size shall be utilized to retain storm water on the site. 2. Where storm water is conveyed to a public drainage system, collection point, gutter or similar disposal method, water shall be filtered by use of a barrier system, wattle or other method approved by the enforcing agency. 3. Compliance with a lawfully enacted storm water management ordinance. Note: Refer to the State Water Resources Control Board for projects which disturb one acre or more of soil, or are part of a larger common plan of development which in total disturbs one acre or more of soil. (Website: https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.html) 4.106.3 GRADING AND PAVING. Construction plans shall indicate how the site grading or drainage system will manage all surface water flows to keep water from entering buildings. Examples of methods to manage surface water include, but are not limited to, the following: 1. Swales 2. Water collection and disposal systems 3. French drains 4. Water retention gardens 5. Other water measures which keep surface water away from buildings and aid in groundwater recharge. Exception: Additions and alterations not altering the drainage path. 4.106.4 Electric vehicle (EV) charging for new construction. New construction shall comply with Section 4.106.4.1 or 4.106.4.2. Electric vehicle supply equipment (EVSE) shall comply with the California Electrical Code. Exceptions: 1. On a case-by-case basis, where the local enforcing agency has determined EV charging and infrastructure are not feasible based upon one or more of the following conditions: 1.1 Where there is no local utility power supply or the local utility is unable to supply adequate power. 1.2 Where there is evidence suitable to the local enforcing agency substantiating that additional local utility infrastructure design requirements, directly related to the implementation of Section 4.106.4, may adversely impact the construction cost of the project. 2. Accessory Dwelling Units (ADU) and Junior Accessory Dwelling Units (JADU) without additional parking facilities. 4.106.4.1 New one- and two-family dwellings and townhouses with attached private garages. For each dwelling unit, install a listed raceway to accommodate a dedicated 208/240-volt branch circuit. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or other enclosure in close proximity to the proposed location of an EV charger. Raceways are required to be continuous at enclosed, inaccessible or concealed areas and spaces. The service panel and/or subpanel shall provide capacity to install a 40-ampere 208/240-volt minimum dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overcurrent protective device. Exemption: A raceway is not required if a minimum 40-ampere 208/240-volt dedicated EV branch circuit is installed in close proximity to the proposed location of an EV charger at the time of original construction in accordance with the California Electrical Code. 4.106.4.1.1 Identification. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging as "EV CAPABLE". The raceway termination location shall be permanently and visibly marked as "EV CAPABLE". CHAPTER 3 GREEN BUILDING SECTION 301 GENERAL 301.1 SCOPE. Buildings shall be designed to include the green building measures specified as mandatory in the application checklists contained in this code. Voluntary green building measures are also included in the application checklists and may be included in the design and construction of structures covered by this code, but are not required unless adopted by a city, county, or city and county as specified in Section 101.7. 301.1.1 Additions and alterations. [HCD] The mandatory provisions of Chapter 4 shall be applied to additions or alterations of existing residential buildings where the addition or alteration increases the building's conditioned area, volume, or size. The requirements shall apply only to and/or within the specific area of the addition or alteration. The mandatory provision of Section 4.106.4.2 may apply to additions or alterations of existing parking facilities or the addition of new parking facilities serving existing multifamily buildings. See Section 4.106.4.3 for application. Note: Repairs including, but not limited to, resurfacing, restriping and repairing or maintaining existing lighting fixtures are not considered alterations for the purpose of this section. Note: On and after January 1, 2014, residential buildings undergoing permitted alterations, additions, or improvements shall replace noncompliant plumbing fixtures with water-conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of a certificate of final completion, certificate of occupancy or final permit approval by the local building department. See Civil Code Section 1101.1, et seq., for the definition of a noncompliant plumbing fixture, types of residential buildings affected and other important enactment dates. 301.2 LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS. [HCD] The provisions of individual sections of CALGreen may apply to either low-rise residential buildings high-rise residential buildings, or both. Individual sections will be designated by banners to indicate where the section applies specifically to low-rise only (LR) or high-rise only (HR). When the section applies to both low-rise and high-rise buildings, no banner will be used. SECTION 302 MIXED OCCUPANCY BUILDINGS 302.1 MIXED OCCUPANCY BUILDINGS. In mixed occupancy buildings, each portion of a building shall comply with the specific green building measures applicable to each specific occupancy. Exceptions: 1. [HCD] Accessory structures and accessory occupancies serving residential buildings shall comply with Chapter 4 and Appendix A4, as applicable. 2. [HCD] For purposes of CALGreen, live/work units, complying with Section 419 of the California Building Code, shall not be considered mixed occupancies. Live/Work units shall comply with Chapter 4 and Appendix A4, as applicable. 4.106.4.2 New multifamily dwellings, hotels and motels and new residential parking facilities. When parking is provided, parking spaces for new multifamily dwellings, hotels and motels shall meet the requirements of Section 4.106.4.2.2. Calculations for spaces shall be rounded up to the nearest whole number. A parking space served by electric vehicle supply equipment or designed as an EV charging space shall count as at least one standard automobile parking space only for the purpose of complying with any applicable minimum parking space requirements established by a local jurisdiction. See Vehicle Code Section 22511.2 for further details. 4.106.4.2.1 Reserved. 4.106.4.2.2 Multifamily dwellings, hotels and motels 1. EV ready parking spaces with receptacles. a. Hotels and motels. Forty (40) percent of the total number of parking spaces shall be equipped with low power Level 2 EV charging receptacles. b. Multifamily parking facilities. Forty (40) percent of the total number of parking spaces shall be equipped with low power Level 2 EV charging receptacles. EV charging receptacles required by this section shall be located in at least one assigned parking space per dwelling unit where assigned parking is provided but need not exceed forty (40) percent of the total number of assigned parking spaces provided on the site. Exception: Areas of parking facilities served by parking lifts, including but not limited to automated mechanical-access open parking garages as defined in the California Building Code; or parking facilities otherwise incapable of supporting electric vehicle charging. c. Receptacle power source. EV charging receptacles in multifamily parking facilities shall be provided with a dedicated branch circuit connected to the dwelling unit’s electrical panel, unless determined as infeasible by the project builder or designer and subject to concurrence of the local enforcing agency. Exception: Areas of parking facilities served by parking lifts, including but not limited to automated mechanical-access open parking garages as defined in the California Building Code; or parking facilities otherwise incapable of supporting electric vehicle charging. d. Receptacle configurations. 208/240V EV charging receptacles shall comply with one of the following configurations: 1. For 20-ampere receptacles, NEMA 6-20R 2. For 30-ampere receptacles, NEMA 14-30R 3. For 50-ampere receptacles, NEMA 14-50R 2. EV ready parking spaces with EV chargers. a. Hotels and motels. Ten (10) percent of the total number of parking spaces shall be equipped with Level 2 EV chargers. At least fifty (50) percent of the required EV chargers shall be equipped with J1772 connectors. b. Multifamily parking facilities. Ten (10) percent of the total number of parking spaces shall be equipped with Level 2 EV chargers. At least fifty (50) percent of the required EV chargers shall be equipped with J1772 connectors. Where common use parking or unassigned parking is provided, EV chargers shall be located in common use or unassigned parking areas and shall be available for use by all residents or guests. Where low power Level 2 EV charging receptacles or Level 2 EV chargers are installed beyond the minimum required, an automatic load management system (ALMS) may be used to reduce the maximum required electrical capacity to each space served by the ALMS. The electrical system and any on-site distribution transformers shall have sufficient capacity to deliver at least 3.3 kW simultaneously to each EV charging station (EVCS) served by the ALMS. The branch circuit shall have a minimum capacity of 40 amperes, and installed EV chargers shall have a capacity of not less than 30 amperes. 4.106.4.2.2.1 Electric vehicle charging stations (EVCS). Electric vehicle charging stations required by Section 4.106.4.2.2, Item 2, with EV chargers installed shall comply with Section 4.106.4.2.2.1.1. Exception: Electric vehicle charging stations serving public accommodations, public housing, motels and hotels shall not be required to comply with this section. See California Building Code, Chapter 11B, for applicable requirements. 4.106.4.2.2.1.1 Electric vehicle charging stations (EVCS) spaces with EV chargers installed; dimensions and location. EVCS spaces shall be designed to comply with the following: 1.The minimum length of each EVCS space shall be 18 feet (5486 mm). 2.The minimum width of each EVCS space shall be 9 feet (2743 mm). 3.One in every 25 EVCS spaces, but not less than one, shall also have an 8-foot (2438 mm) wide minimum aisle. A 5-foot (1524 mm) wide minimum aisle shall be permitted provided the minimum width of the EVCS space is 12 feet (3658 mm). Surface slope for this EVCS space and the aisle shall not exceed 1 unit vertical in 48 units horizontal (2.083 percent slope) in any direction. These EVCS spaces shall also comply with at least one of the following: a. The EVCS space shall be located adjacent to an accessible parking space meeting the requirements of the California Building Code, Chapter 11A, to allow use of the EV charger from the accessible parking space. b. The EVCS space shall be located on an accessible route, as defined in the California Building Code, Chapter 2, to the building. Exception: Electric vehicle charging stations designed and constructed in compliance with the California Building Code, Chapter 11B, are not required to comply with Section 4.106.4.2.2.1.1. 4.106.4.2.2.1.2 Accessible electric vehicle charging station spaces. In addition to the requirements in Section 4.106.4.2.2.1.1, all EV chargers, where installed, shall comply with the accessibility provisions for EV chargers in the California Building Code, Chapter 11B. EV ready spaces and EVCS in multifamily developments shall comply with California Building Code, Chapter 11A, Section 1109A. 4.106.4.2.3 Reserved. 4.106.4.2.4 Reserved. 4.106.4.2.5 Electric vehicle ready space signage. Electric vehicle ready spaces shall be identified by signage or pavement markings, in compliance with Caltrans Traffic Operations Policy Directive 13-01 (Zero Emission Vehicle Signs and Pavement Markings) or its successor(s). 4.106.4.3 Electric vehicle charging for additions and alterations of parking facilities serving existing multi-family buildings. Where new parking facilities are added, or electrical systems or lighting of existing parking facilities are added or altered and the work requires a building permit, ten (10) percent of the total number of parking spaces added or altered shall be EV capable spaces to support future Level 2 electric vehicle supply equipment. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as “EV CAPABLE.” Notes: 1.Construction documents are intended to demonstrate the project’s capability and capacity for facilitating future EV charging. 2.There is no requirement for EV spaces to be constructed or available until EV chargers are installed for use. SECTION 4.501 GENERAL 4.501.1 Scope The provisions of this chapter shall outline means of reducing the quality of air contaminants that are odorous, irritating and/or harmful to the comfort and well being of a building's installers, occupants and neighbors. SECTION 4.502 DEFINITIONS 5.102.1 DEFINITIONS The following terms are defined in Chapter 2 (and are included here for reference) AGRIFIBER PRODUCTS. Agrifiber products include wheatboard, strawboard, panel substrates and door cores, not including furniture, fixtures and equipment (FF&E) not considered base building elements. COMPOSITE WOOD PRODUCTS. Composite wood products include hardwood plywood, particleboard and medium density fiberboard. "Composite wood products" does not include hardboard, structural plywood, structural panels, structural composite lumber, oriented strand board, glued laminated timber, prefabricated wood I-joists or finger-jointed lumber, all as specified in California Code of regulations (CCR), title 17, Section 93120.1. DIRECT-VENT APPLIANCE. A fuel-burning appliance with a sealed combustion system that draws all air for combustion from the outside atmosphere and discharges all flue gases to the outside atmosphere. DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE. Y N/AYN/AYN/AYN/A RESPON. PARTY RESPON. PARTY RESPON. PARTY RESPON. PARTY 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE RESIDENTIAL MANDATORY MEASURES, SHEET 1 (July 2024 Supplement)Y = YES N/A =NOT APPLICABLE RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER, OWNER, CONTRACTOR, INSPECTOR ETC.) 4.201 GENERAL 4.201.1 SCOPE. For the purposes of mandatory energy efficiency standards in this code, the California Energy Commission will continue to adopt mandatory standards. DIVISION 4.2 ENERGY EFFICIENCY TABLE H-2 STANDARDS FOR COMMERCIAL PRE-RINSE SPRAY VALUES MANUFACTURED ON OR AFTER JANUARY 28, 2019 PRODUCT CLASS [spray force in ounce force (ozf)]MAXIMUM FLOW RATE (gpm) Product Class 1 (≤1.00 Product Class 2 (> 5.0 ozf and ≤1.20 Product Class 3 (> 8.0 ozf)1.28 X NE W D E T A C H E D A D U 11 2 8 E L A I N E D R ( A D U ) , SA N T A A N A , C A 9 2 7 0 3 Job # Sheet No.: Scale Date Pr o j e c t f o r : SEAL: SHEET DESCRIPTION : 10/14/25 24212 OW N E R : EN G I N E E R : DI E M L E & T A O P H A M 11 2 6 E L A I N E D R , SA N T A A N A , C A 9 2 7 0 3 71 4 - 6 0 0 - 7 7 8 1 N2 CAL GREEN REQUIREMENTS MAXIMUM INCREMENTAL REACTIVITY (MIR). The maximum change in weight of ozone formed by adding a compound to the "Base Reactive Organic Gas (ROG) Mixture" per weight of compound added, expressed to hundredths of a gram (g O³/g ROC). Note: MIR values for individual compounds and hydrocarbon solvents are specified in CCR, Title 17, Sections 94700 and 94701. MOISTURE CONTENT. The weight of the water in wood expressed in percentage of the weight of the oven-dry wood. PRODUCT-WEIGHTED MIR (PWMIR). The sum of all weighted-MIR for all ingredients in a product subject to this article. The PWMIR is the total product reactivity expressed to hundredths of a gram of ozone formed per gram of product (excluding container and packaging). Note: PWMIR is calculated according to equations found in CCR, Title 17, Section 94521 (a). REACTIVE ORGANIC COMPOUND (ROC). Any compound that has the potential, once emitted, to contribute to ozone formation in the troposphere. VOC. A volatile organic compound (VOC) broadly defined as a chemical compound based on carbon chains or rings with vapor pressures greater than 0.1 millimeters of mercury at room temperature. These compounds typically contain hydrogen and may contain oxygen, nitrogen and other elements. See CCR Title 17, Section 94508(a). 4.503 FIREPLACES 4.503.1 GENERAL. Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with U.S. EPA New Source Performance Standards (NSPS) emission limits as applicable, and shall have a permanent label indicating they are certified to meet the emission limits. Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances. 4.504 POLLUTANT CONTROL 4.504.1 COVERING OF DUCT OPENINGS & PROTECTION OF MECHANICAL EQUIPMENT DURING CONSTRUCTION. At the time of rough installation, during storage on the construction site and until final startup of the heating, cooling and ventilating equipment, all duct and other related air distribution component openings shall be covered with tape, plastic, sheet metal or other methods acceptable to the enforcing agency to reduce the amount of water, dust or debris which may enter the system. 4.504.2 FINISH MATERIAL POLLUTANT CONTROL. Finish materials shall comply with this section. 4.504.2.1 Adhesives, Sealants and Caulks. Adhesives, sealant and caulks used on the project shall meet the requirements of the following standards unless more stringent local or regional air pollution or air quality management district rules apply: 1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 VOC limits, as shown in Table 4.504.1 or 4.504.2, as applicable. Such products also shall comply with the Rule 1168 prohibition on the use of certain toxic compounds (chloroform, ethylene dichloride, methylene chloride, perchloroethylene and tricloroethylene), except for aerosol products, as specified in Subsection 2 below. 2. Aerosol adhesives, and smaller unit sizes of adhesives, and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than 1 pound and do not consist of more than 16 fluid ounces) shall comply with statewide VOC standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with section 94507. 4.504.2.2 Paints and Coatings. Architectural paints and coatings shall comply with VOC limits in Table 1 of the ARB Architectural Suggested Control Measure, as shown in Table 4.504.3, unless more stringent local limits apply. The VOC content limit for coatings that do not meet the definitions for the specialty coatings categories listed in Table 4.504.3 shall be determined by classifying the coating as a Flat, Nonflat or Nonflat-High Gloss coating, based on its gloss, as defined in subsections 4.21, 4.36, and 4.37 of the 2007 California Air Resources Board, Suggested Control Measure, and the corresponding Flat, Nonflat or Nonflat-High Gloss VOC limit in Table 4.504.3 shall apply. 4.504.2.3 Aerosol Paints and Coatings. Aerosol paints and coatings shall meet the Product-weighted MIR Limits for ROC in Section 94522(a)(2) and other requirements, including prohibitions on use of certain toxic compounds and ozone depleting substances, in Sections 94522(e)(1) and (f)(1) of California Code of Regulations, Title 17, commencing with Section 94520; and in areas under the jurisdiction of the Bay Area Air Quality Management District additionally comply with the percent VOC by weight of product limits of Regulation 8, Rule 49. 4.504.2.4 Verification. Verification of compliance with this section shall be provided at the request of the enforcing agency. Documentation may include, but is not limited to, the following: 1. Manufacturer's product specification. 2. Field verification of on-site product containers. CHAPTER 7 INSTALLER & SPECIAL INSPECTOR QUALIFICATIONS 702 QUALIFICATIONS 702.1 INSTALLER TRAINING. HVAC system installers shall be trained and certified in the proper installation of HVAC systems including ducts and equipment by a nationally or regionally recognized training or certification program. Uncertified persons may perform HVAC installations when under the direct supervision and responsibility of a person trained and certified to install HVAC systems or contractor licensed to install HVAC systems. Examples of acceptable HVAC training and certification programs include but are not limited to the following: 1. State certified apprenticeship programs. 2. Public utility training programs. 3. Training programs sponsored by trade, labor or statewide energy consulting or verification organizations. 4. Programs sponsored by manufacturing organizations. 5. Other programs acceptable to the enforcing agency. 702.2 SPECIAL INSPECTION [HCD]. When required by the enforcing agency, the owner or the responsible entity acting as the owner's agent shall employ one or more special inspectors to provide inspection or other duties necessary to substantiate compliance with this code. Special inspectors shall demonstrate competence to the satisfaction of the enforcing agency for the particular type of inspection or task to be performed. In addition to other certifications or qualifications acceptable to the enforcing agency, the following certifications or education may be considered by the enforcing agency when evaluating the qualifications of a special inspector: 1. Certification by a national or regional green building program or standard publisher. 2. Certification by a statewide energy consulting or verification organization, such as HERS raters, building performance contractors, and home energy auditors. 3. Successful completion of a third party apprentice training program in the appropriate trade. 4. Other programs acceptable to the enforcing agency. Notes: 1. Special inspectors shall be independent entities with no financial interest in the materials or the project they are inspecting for compliance with this code. 2. HERS raters are special inspectors certified by the California Energy Commission (CEC) to rate homes in California according to the Home Energy Rating System (HERS). [BSC] When required by the enforcing agency, the owner or the responsible entity acting as the owner's agent shall employ one or more special inspectors to provide inspection or other duties necessary to substantiate compliance with this code. Special inspectors shall demonstrate competence to the satisfaction of the enforcing agency for the particular type of inspection or task to be performed. In addition, the special inspector shall have a certification from a recognized state, national or international association, as determined by the local agency. The area of certification shall be closely related to the primary job function, as determined by the local agency. Note: Special inspectors shall be independent entities with no financial interest in the materials or the project they are inspecting for compliance with this code. 703 VERIFICATIONS 703.1 DOCUMENTATION. Documentation used to show compliance with this code shall include but is not limited to, construction documents, plans, specifications, builder or installer certification, inspection reports, or other methods acceptable to the enforcing agency which demonstrate substantial conformance. When specific documentation or special inspection is necessary to verify compliance, that method of compliance will be specified in the appropriate section or identified applicable checklist. 4.505 INTERIOR MOISTURE CONTROL 4.505.1 General. Buildings shall meet or exceed the provisions of the California Building Standards Code. 4.505.2 CONCRETE SLAB FOUNDATIONS. Concrete slab foundations required to have a vapor retarder by California Building Code, Chapter 19, or concrete slab-on-ground floors required to have a vapor retarder by the California Residential Code, Chapter 5, shall also comply with this section. 4.505.2.1 Capillary break. A capillary break shall be installed in compliance with at least one of the following: 1. A 4-inch (101.6 mm) thick base of 1/2 inch (12.7mm) or larger clean aggregate shall be provided with a vapor barrier in direct contact with concrete and a concrete mix design, which will address bleeding, shrinkage, and curling, shall be used. For additional information, see American Concrete Institute, ACI 302.2R-06. 2. Other equivalent methods approved by the enforcing agency. 3. A slab design specified by a licensed design professional. 4.505.3 MOISTURE CONTENT OF BUILDING MATERIALS. Building materials with visible signs of water damage shall not be installed. Wall and floor framing shall not be enclosed when the framing members exceed 19 percent moisture content. Moisture content shall be verified in compliance with the following: 1. Moisture content shall be determined with either a probe-type or contact-type moisture meter.Equivalent moisture verification methods may be approved by the enforcing agency and shall satisfy requirements found in Section 101.8 of this code. 2. Moisture readings shall be taken at a point 2 feet (610 mm) to 4 feet (1219 mm) from the grade stamped end of each piece verified. 3. At least three random moisture readings shall be performed on wall and floor framing with documentation acceptable to the enforcing agency provided at the time of approval to enclose the wall and floor framing. Insulation products which are visibly wet or have a high moisture content shall be replaced or allowed to dry prior to enclosure in wall or floor cavities. Wet-applied insulation products shall follow the manufacturers' drying recommendations prior to enclosure. 4.506 INDOOR AIR QUALITY AND EXHAUST 4.506.1 Bathroom exhaust fans. Each bathroom shall be mechanically ventilated and shall comply with the following: 1. Fans shall be ENERGY STAR compliant and be ducted to terminate outside the building. 2. Unless functioning as a component of a whole house ventilation system, fans must be controlled by a humidity control. a. Humidity controls shall be capable of adjustment between a relative humidity range less than or equal to 50% to a maximum of 80%. A humidity control may utilize manual or automatic means of adjustment. b. A humidity control may be a separate component to the exhaust fan and is not required to be integral (i.e., built-in) Notes: 1. For the purposes of this section, a bathroom is a room which contains a bathtub, shower or tub/shower combination. 2. Lighting integral to bathroom exhaust fans shall comply with the California Energy Code. 4.507 ENVIRONMENTAL COMFORT 4.507.2 HEATING AND AIR-CONDITIONING SYSTEM DESIGN. Heating and air conditioning systems shall be sized, designed and have their equipment selected using the following methods: 1. The heat loss and heat gain is established according to ANSI/ACCA 2 Manual J - 2011 (Residential Load Calculation), ASHRAE handbooks or other equivalent design software or methods. 2. Duct systems are sized according to ANSI/ACCA 1 Manual D - 2014 (Residential Duct Systems), ASHRAE handbooks or other equivalent design software or methods. 3. Select heating and cooling equipment according to ANSI/ACCA 3 Manual S - 2014 (Residential Equipment Selection), or other equivalent design software or methods. Exception: Use of alternate design temperatures necessary to ensure the system functions are acceptable. TABLE 4.504.1 - ADHESIVE VOC LIMIT1,2 (Less Water and Less Exempt Compounds in Grams per Liter) ARCHITECTURAL APPLICATIONS VOC LIMIT INDOOR CARPET ADHESIVES 50 CARPET PAD ADHESIVES 50 OUTDOOR CARPET ADHESIVES 150 WOOD FLOORING ADHESIVES 100 RUBBER FLOOR ADHESIVES 60 SUBFLOOR ADHESIVES 50 CERAMIC TILE ADHESIVES 65 VCT & ASPHALT TILE ADHESIVES 50 DRYWALL & PANEL ADHESIVES 50 COVE BASE ADHESIVES 50 MULTIPURPOSE CONSTRUCTION ADHESIVE 70 STRUCTURAL GLAZING ADHESIVES 100 SINGLE-PLY ROOF MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC WELDING 510 CPVC WELDING 490 ABS WELDING 325 PLASTIC CEMENT WELDING 250 ADHESIVE PRIMER FOR PLASTIC 550 CONTACT ADHESIVE 80 SPECIAL PURPOSE CONTACT ADHESIVE 250 STRUCTURAL WOOD MEMBER ADHESIVE 140 TOP & TRIM ADHESIVE 250 SUBSTRATE SPECIFIC APPLICATIONS METAL TO METAL 30 PLASTIC FOAMS 50 POROUS MATERIAL (EXCEPT WOOD)50 WOOD 30 FIBERGLASS 80 1. IF AN ADHESIVE IS USED TO BOND DISSIMILAR SUBSTRATES TOGETHER, THE ADHESIVE WITH THE HIGHEST VOC CONTENT SHALL BE ALLOWED. 2. FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC CONTENT SPECIFIED IN THIS TABLE, SEE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1168. TABLE 4.504.2 - SEALANT VOC LIMIT (Less Water and Less Exempt Compounds in Grams per Liter) SEALANTS VOC LIMIT ARCHITECTURAL 250 MARINE DECK 760 NONMEMBRANE ROOF 300 ROADWAY 250 SINGLE-PLY ROOF MEMBRANE 450 OTHER 420 SEALANT PRIMERS ARCHITECTURAL NON-POROUS 250 POROUS 775 MODIFIED BITUMINOUS 500 MARINE DECK 760 OTHER 750 TABLE 4.504.5 - FORMALDEHYDE LIMITS1 MAXIMUM FORMALDEHYDE EMISSIONS IN PARTS PER MILLION PRODUCT CURRENT LIMIT HARDWOOD PLYWOOD VENEER CORE 0.05 HARDWOOD PLYWOOD COMPOSITE CORE 0.05 PARTICLE BOARD 0.09 MEDIUM DENSITY FIBERBOARD 0.11 THIN MEDIUM DENSITY FIBERBOARD2 0.13 1. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIF. AIR RESOURCES BOARD, AIR TOXICS CONTROL MEASURE FOR COMPOSITE WOOD AS TESTED IN ACCORDANCE WITH ASTM E 1333. FOR ADDITIONAL INFORMATION, SEE CALIF. CODE OF REGULATIONS, TITLE 17, SECTIONS 93120 THROUGH 93120.12. 2. THIN MEDIUM DENSITY FIBERBOARD HAS A MAXIMUM THICKNESS OF 5/16" (8 MM). TABLE 4.504.3 - VOC CONTENT LIMITS FOR ARCHITECTURAL COATINGS2,3 GRAMS OF VOC PER LITER OF COATING, LESS WATER & LESS EXEMPT COMPOUNDS COATING CATEGORY VOC LIMIT FLAT COATINGS 50 NON-FLAT COATINGS 100 NONFLAT-HIGH GLOSS COATINGS 150 SPECIALTY COATINGS ALUMINUM ROOF COATINGS 400 BASEMENT SPECIALTY COATINGS 400 BITUMINOUS ROOF COATINGS 50 BITUMINOUS ROOF PRIMERS 350 BOND BREAKERS 350 CONCRETE CURING COMPOUNDS 350 CONCRETE/MASONRY SEALERS 100 DRIVEWAY SEALERS 50 DRY FOG COATINGS 150 FAUX FINISHING COATINGS 350 FIRE RESISTIVE COATINGS 350 FLOOR COATINGS 100 FORM-RELEASE COMPOUNDS 250 GRAPHIC ARTS COATINGS (SIGN PAINTS)500 HIGH TEMPERATURE COATINGS 420 INDUSTRIAL MAINTENANCE COATINGS 250 LOW SOLIDS COATINGS1 120 MAGNESITE CEMENT COATINGS 450 MASTIC TEXTURE COATINGS 100 METALLIC PIGMENTED COATINGS 500 MULTICOLOR COATINGS 250 PRETREATMENT WASH PRIMERS 420 PRIMERS, SEALERS, & UNDERCOATERS 100 REACTIVE PENETRATING SEALERS 350 RECYCLED COATINGS 250 ROOF COATINGS 50 RUST PREVENTATIVE COATINGS 250 SHELLACS CLEAR 730 OPAQUE 550 SPECIALTY PRIMERS, SEALERS & UNDERCOATERS 100 STAINS 250 STONE CONSOLIDANTS 450 SWIMMING POOL COATINGS 340 TRAFFIC MARKING COATINGS 100 TUB & TILE REFINISH COATINGS 420 WATERPROOFING MEMBRANES 250 WOOD COATINGS 275 WOOD PRESERVATIVES 350 ZINC-RICH PRIMERS 340 1. GRAMS OF VOC PER LITER OF COATING, INCLUDING WATER & EXEMPT COMPOUNDS 2. THE SPECIFIED LIMITS REMAIN IN EFFECT UNLESS REVISED LIMITS ARE LISTED IN SUBSEQUENT COLUMNS IN THE TABLE. 3. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA AIR RESOURCES BOARD, ARCHITECTURAL COATINGS SUGGESTED CONTROL MEASURE, FEB. 1, 2008. MORE INFORMATION IS AVAILABLE FROM THE AIR RESOURCES BOARD. DIVISION 4.5 ENVIRONMENTAL QUALITY (continued) 4.504.3 CARPET SYSTEMS. All carpet installed in the building interior shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.3.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.3.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 4.504.1. 4.504.4 RESILIENT FLOORING SYSTEMS. Where resilient flooring is installed , at least 80% of floor area receiving resilient flooring shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. hhtps://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.5 COMPOSITE WOOD PRODUCTS. Hardwood plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the buildings shall meet the requirements for formaldehyde as specified in ARB's Air Toxics Control Measure for Composite Wood (17 CCR 93120 et seq.), by or before the dates specified in those sections, as shown in Table 4.504.5 4.504.5.1 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: 1. Product certifications and specifications. 2. Chain of custody certifications. 3. Product labeled and invoiced as meeting the Composite Wood Products regulation (see CCR, Title 17, Section 93120, et seq.). 4. Exterior grade products marked as meeting the PS-1 or PS-2 standards of the Engineered Wood Association, the Australian AS/NZS 2269, European 636 3S standards, and Canadian CSA 0121, CSA 0151, CSA 0153 and CSA 0325 standards. 5. Other methods acceptable to the enforcing agency. DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE. Y N/AYN/AYN/AYN/A RESPON. PARTY RESPON. PARTY RESPON. PARTY RESPON. PARTY 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE RESIDENTIAL MANDATORY MEASURES, SHEET 2 (July 2024 Supplement)Y = YES N/A =NOT APPLICABLE RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER, OWNER, CONTRACTOR, INSPECTOR ETC.) TITLE 24 T24-1 Job # Sheet No.: Scale Date Pl a n C h e c k # : __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ SEAL: SHEET DESCRIPTION : 02/10/2025 S24212 DE T A C H E D A D U 11 2 8 E L A I N E D R . , SA N T A A N A , C A 9 2 7 0 3 Pr o j e c t f o r : TITLE 24 T24-2 Job # Sheet No.: Scale Date Pl a n C h e c k # : __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ SEAL: SHEET DESCRIPTION : 02/10/2025 S24212 DE T A C H E D A D U 11 2 8 E L A I N E D R . , SA N T A A N A , C A 9 2 7 0 3 Pr o j e c t f o r : DATE:2/13/2025 CLIENT: SANTA ANA, CA 91703 Project: DETACHED ADU STRUCTURAL CALCULATIONS FOR ADU AT: 1126 ELAIN DR., PAGE:2 DATE: 02/13/25 Project #:2130 ADU ROOF:SHINGLE Slope 4:12 Live Load 20 psf Roof'g Material 5 psf Sheathing 2.0 psf Trusses / Rafters 2.0 psf Ceiling Joists 2.0 psf Drywall 2.0 psf Sprinkler 0.5 psf Miscellaneous 1.5 psf Total D.L.15 psf Total Load 35 psf EXTERIOR WALL: EXTERIOR:9 DRYWALL:3.0 STUDS:2.0 MISC.:1.0 DL=15.0 PSF INTERIOR WALL: DRYWALL:3 DRYWALL:3.0 STUDS:2.0 MISC.:2.0 DL=10.0 PSF LOADING CONDITIONS 1 Level Member Name Results (Max UTIL %)Current Solution Comments 2x6 @ 16" O.C. R.R. Check Passed (69% ΔT)1 piece(s) 2 x 6 DF No.2 @ 16" OC 2x6 @ 16" O.C. C.J Check Passed (95% ΔT)1 piece(s) 2 x 6 DF No.2 @ 16" OC Header Check Passed (79% M)1 piece(s) 4 x 6 DF No.2 BM1 - Ceiling Beam Passed (95% M)1 piece(s) 4 x 10 DF No.2 BM2 - Header Passed (89% M)1 piece(s) 4 x 6 DF No.2 1126 Elaine Dr JOB SUMMARY REPORT ForteWEB Software Operator Job Notes 2/14/2025 12:57:36 AM UTC Trang Ho LT Designs (714) 213-1608 onetrang10@gmail.com ForteWEB v3.8 File Name: 1126 Elaine Dr Page 1 / 6 2 Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)246 @ 2 1/2" 3281 (3.50") Passed (7%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs)216 @ 8 11/16"1238 Passed (17%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs)693 @ 6' 1/2"1060 Passed (65%) 1.25 1.0 D + 1.0 Lr (All Spans) Live Load Defl. (in)0.371 @ 6' 1/2" 0.615 Passed (L/398) -- 1.0 D + 1.0 Lr (All Spans) Total Load Defl. (in)0.567 @ 6' 1/2" 0.820 Passed (L/260) -- 1.0 D + 1.0 Lr (All Spans) Member Length : 12' 10 11/16" System : Roof Member Type : Joist Building Use : Residential Building Code : IBC 2021 Design Methodology : ASD Member Pitch : 4/12 • Deflection criteria: LL (L/240) and TL (L/180). • A 15% increase in the moment capacity has been added to account for repetitive member usage. • Applicable calculations are based on NDS. • Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Bearing Length Loads to Supports (lbs) Supports Total Available Required Dead Roof Live Factored Accessories 1 - Beveled Plate - DF 3.50" 3.50" 1.50" 85 161 246 Blocking 2 - Beveled Plate - DF 3.50" 3.50" 1.50" 85 161 246 Blocking •Dimensions for lateral bracing intervals are measured along the length of the member for sloped conditions. Lateral Bracing Bracing Intervals Comments Top Edge (Lu)Continuous Bottom Edge (Lu)Continuous Dead Roof Live Vertical Load Location (Side)Spacing (0.90)(1.25)Comments 1 - Uniform (PSF)0 to 12' 1"16"10.0 20.0 Roof Load Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator Weyerhaeuser Notes Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.). MEMBER REPORT PASSED Level, 2x6 @ 16" O.C. R.R. Check 1 piece(s) 2 x 6 DF No.2 @ 16" OC ForteWEB Software Operator Job Notes 2/14/2025 12:57:36 AM UTC Trang Ho LT Designs (714) 213-1608 onetrang10@gmail.com ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: 1126 Elaine Dr Page 2 / 6 3 Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)180 @ 2 1/2" 2109 (2.25") Passed (9%) -- 1.0 D + 1.0 L (All Spans) Shear (lbs)167 @ 9"990 Passed (17%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)788 @ 9' 1"848 Passed (93%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.895 @ 9' 1"1.183 Passed (L/238) -- 1.0 D + 1.0 L (All Spans) Total Load Defl. (in)1.342 @ 9' 1"1.420 Passed (L/159) -- 1.0 D + 1.0 L (All Spans) Member Length : 17' 11 1/2" System : Ceiling Member Type : Attic Joist Building Use : Residential Building Code : IBC 2021 Design Methodology : ASD Member Pitch : 0/12 • Deflection criteria: LL (L/180) and TL (L/150). • Allowed moment does not reflect the adjustment for the beam stability factor. • A 15% increase in the moment capacity has been added to account for repetitive member usage. • Applicable calculations are based on NDS. • Rim Board is assumed to carry all loads applied directly above it, bypassing the member being designed. Bearing Length Loads to Supports (lbs) Supports Total Available Required Dead Floor/Ceiling Live Factored Accessories 1 - Stud wall - DF 3.50" 2.25" 1.50" 61 121 182 1 1/4" Rim Board 2 - Stud wall - DF 3.50" 2.25" 1.50" 61 121 182 1 1/4" Rim Board •Maximum allowable bracing intervals based on applied load. Lateral Bracing Bracing Intervals Comments Top Edge (Lu)6' 2" o/c Bottom Edge (Lu)17' 11" o/c • Only vertical loads are available for Attic Joist member types. No tension loading will be considered in the design for these members. Dead Floor/Ceiling Live Vertical Load Location (Side)Spacing (0.90)(1.00)Comments 1 - Uniform (PSF)0 to 18' 2"16"5.0 10.0 Ceiling Load Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator Weyerhaeuser Notes Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.). MEMBER REPORT PASSED Level, 2x6 @ 16" O.C. C.J Check 1 piece(s) 2 x 6 DF No.2 @ 16" OC ForteWEB Software Operator Job Notes 2/14/2025 12:57:36 AM UTC Trang Ho LT Designs (714) 213-1608 onetrang10@gmail.com ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: 1126 Elaine Dr Page 3 / 6 4 Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1296 @ 0 3281 (1.50") Passed (39%) -- 1.0 D + 0.75 L + 0.75 Lr (All Spans) Shear (lbs)1008 @ 7"2888 Passed (35%) 1.25 1.0 D + 0.75 L + 0.75 Lr (All Spans) Moment (Ft-lbs)1701 @ 2' 7 1/2" 2151 Passed (79%) 1.25 1.0 D + 0.75 L + 0.75 Lr (All Spans) Live Load Defl. (in)0.057 @ 2' 7 1/2" 0.175 Passed (L/999+) -- 1.0 D + 0.75 L + 0.75 Lr (All Spans) Total Load Defl. (in)0.109 @ 2' 7 1/2" 0.262 Passed (L/580) -- 1.0 D + 0.75 L + 0.75 Lr (All Spans) Member Length : 5' 3" System : Wall Member Type : Header Building Use : Residential Building Code : IBC 2021 Design Methodology : ASD • Deflection criteria: LL (L/360) and TL (L/240). • Allowed moment does not reflect the adjustment for the beam stability factor. • Applicable calculations are based on NDS. Bearing Length Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Roof Live Factored Accessories 1 - Trimmer - DF 1.50" 1.50" 1.50" 617 302 604 1296 None 2 - Trimmer - DF 1.50" 1.50" 1.50" 617 302 604 1296 None •Maximum allowable bracing intervals based on applied load. Lateral Bracing Bracing Intervals Comments Top Edge (Lu)5' 3" o/c Bottom Edge (Lu)5' 3" o/c Dead Floor Live Roof Live Vertical Loads Location Tributary Width (0.90)(1.00)(1.25)Comments 0 - Self Weight (PLF)0 to 5' 3"N/A 4.9 ---- 1 - Uniform (PSF)0 to 5' 3"11' 6"15.0 -20.0 Roof Load 2 - Uniform (PSF)0 to 5' 3"11' 6"5.0 10.0 -Ceiling Load Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator Weyerhaeuser Notes Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.). MEMBER REPORT PASSED Level, Header Check 1 piece(s) 4 x 6 DF No.2 ForteWEB Software Operator Job Notes 2/14/2025 12:57:36 AM UTC Trang Ho LT Designs (714) 213-1608 onetrang10@gmail.com ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: 1126 Elaine Dr Page 4 / 6 5 Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1272 @ 2" 7656 (3.50") Passed (17%) -- 1.0 D + 1.0 L (All Spans) Shear (lbs)1080 @ 1' 3/4"3885 Passed (28%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)4270 @ 7' 1/2"4492 Passed (95%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.250 @ 7' 1/2" 0.688 Passed (L/659) -- 1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.393 @ 7' 1/2" 0.917 Passed (L/419) -- 1.0 D + 1.0 L (All Spans) Member Length : 14' 1" System : Roof Member Type : Drop Beam Building Use : Residential Building Code : IBC 2021 Design Methodology : ASD Member Pitch : 0/12 • Deflection criteria: LL (L/240) and TL (L/180). • Allowed moment does not reflect the adjustment for the beam stability factor. • Applicable calculations are based on NDS. • Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Bearing Length Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Factored Accessories 1 - Stud wall - DF 3.50" 3.50" 1.50" 463 810 1272 Blocking 2 - Stud wall - DF 3.50" 3.50" 1.50" 463 810 1272 Blocking •Maximum allowable bracing intervals based on applied load. Lateral Bracing Bracing Intervals Comments Top Edge (Lu)14' 1" o/c Bottom Edge (Lu)14' 1" o/c • Side loads are assumed to not induce cross-grain tension. Dead Floor Live Vertical Loads Location (Side)Tributary Width (0.90)(1.00)Comments 0 - Self Weight (PLF)0 to 14' 1"N/A 8.2 -- 1 - Uniform (PSF)0 to 14' 1" (Front)11' 6"5.0 10.0 Ceiling Load Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator Weyerhaeuser Notes Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.). MEMBER REPORT PASSED Level, BM1 - Ceiling Beam 1 piece(s) 4 x 10 DF No.2 ForteWEB Software Operator Job Notes 2/14/2025 12:57:36 AM UTC Trang Ho LT Designs (714) 213-1608 onetrang10@gmail.com ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: 1126 Elaine Dr Page 5 / 6 6 Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern) Member Reaction (lbs)1014 @ 5' 5" 7656 (3.50") Passed (13%) -- 1.0 D + 1.0 L (All Spans) Shear (lbs)981 @ 4' 10"2310 Passed (42%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs)1538 @ 3' 10"1720 Passed (89%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in)0.047 @ 2' 11 7/8" 0.262 Passed (L/999+) -- 1.0 D + 1.0 L (All Spans) Total Load Defl. (in)0.078 @ 2' 11 3/4" 0.350 Passed (L/803) -- 1.0 D + 1.0 L (All Spans) Member Length : 5' 7" System : Roof Member Type : Drop Beam Building Use : Residential Building Code : IBC 2021 Design Methodology : ASD Member Pitch : 0/12 • Deflection criteria: LL (L/240) and TL (L/180). • Allowed moment does not reflect the adjustment for the beam stability factor. • Applicable calculations are based on NDS. • Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Bearing Length Loads to Supports (lbs) Supports Total Available Required Dead Floor Live Roof Live Factored Accessories 1 - Stud wall - DF 3.50" 3.50" 1.50" 228 282 74 509 Blocking 2 - Stud wall - DF 3.50" 3.50" 1.50" 411 603 74 1014 Blocking •Maximum allowable bracing intervals based on applied load. Lateral Bracing Bracing Intervals Comments Top Edge (Lu)5' 7" o/c Bottom Edge (Lu)5' 7" o/c • Side loads are assumed to not induce cross-grain tension. Dead Floor Live Roof Live Vertical Loads Location (Side)Tributary Width (0.90)(1.00)(1.25)Comments 0 - Self Weight (PLF)0 to 5' 7"N/A 4.9 ---- 1 - Uniform (PSF)0 to 5' 7" (Front)1' 4"15.0 -20.0 Roof Load 2 - Uniform (PSF)0 to 5' 7" (Front)1' 4"5.0 10.0 -Ceiling Load 3 - Point (lb)3' 10" (Front)N/A 463 810 -BM1 Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library. The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator Weyerhaeuser Notes Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.). MEMBER REPORT PASSED Level, BM2 - Header 1 piece(s) 4 x 6 DF No.2 ForteWEB Software Operator Job Notes 2/14/2025 12:57:36 AM UTC Trang Ho LT Designs (714) 213-1608 onetrang10@gmail.com ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: 1126 Elaine Dr Page 6 / 6 7 ASCE Hazards Report Address: 1126 Elaine Dr Santa Ana, California 92703 Standard:ASCE/SEI 7-22 Latitude:33.755187 Risk Category:II Longitude:-117.923068 Soil Class:Default Elevation:80.77152390358633 ft (NAVD 88) Wind Results: Wind Speed 95 Vmph 10-year MRI 66 Vmph 25-year MRI 72 Vmph 50-year MRI 76 Vmph 100-year MRI 81 Vmph 300-year MRI 89 Vmph 700-year MRI 95 Vmph 1,700-year MRI 101 Vmph 3,000-year MRI 106 Vmph 10,000-year MRI 115 Vmph 100,000-year MRI 133 Vmph 1,000,000-year MRI 151 Vmph Data Source: ASCE/SEI 7-22, Fig. 26.5-1B and Figs. CC.2-1–CC.2-4, and Section 26.5.2 Date Accessed: Mon Feb 10 2025 Page 1 of 5https://ascehazardtool.org/Mon Feb 10 20258 WIND LOAD (ASCE 7-16 MWFRS) Analysis Method Analytic Directional Procedure Basic Wind Speed (ultimate) 95.00 MPH Topography Factor Kzt =1.00 Directionality Factor Kd =0.85 Gust Effect Factor G = 0.85 Internal Pressure Coefficients (GCpi) =0.18 -0.18 Roof Pitch 4.00 :12 18.43 DEG Roof Eve Height 9.000 ft Peak Roof Height 14.500 ft Mean Roof Height 11.750 ft Terrain Exp. Category C Building Length, Parallel to wind direction, L= 23.5 ft L/B = 0.56 Builing Width, Perpendicular to wind direction, B = 41.75 ft h/L =0.50 Elevation Ht. 47.75 ft Ke =1.00 α = 9.5 zg = 900 Velocity Pressures q z =.00256 z z Height (ft)Kz Kzt Kd Ke V (MPH)qz 9.00 0.849 1.00 0.85 1.00 95.00 16.64 11.75 0.849 1.00 0.85 1.00 95.00 16.64 11.750 0.849 1.00 0.85 1.00 95.00 16.64 0.849 1.00 0.85 1.00 95.00 16.64 0.849 1.00 0.85 1.00 95.00 16.64 0.849 1.00 0.85 1.00 95.00 16.64 Design Pressures p = qGC p - q h (GC pi ) Note: Pressures are limit state design pressures for strength design. Multiple by 0.6 for ASD. Transverse Direction: z (ft)qz (psf)Cp qGCp (+GCpi) (-GCpi) 11.75 16.64 0.80 11.32 8.32 14.31 0.00 16.64 0.80 11.32 8.32 14.31 0.00 16.64 0.80 11.32 8.32 14.31 0.00 16.64 0.80 11.32 8.32 14.31 11.75 16.64 -0.50 -7.07 -10.07 -4.08 Windward Roof (Positive)11.75 16.64 -0.06 -0.80 -3.79 2.20 Windward Roof (Negative)11.75 16.64 -0.49 -6.99 -9.98 -3.99 11.75 16.64 -0.57 -8.04 -11.04 -5.05 -7.25 -7.25 8.00 Longitudinal Direction: z (ft)qz (psf)Cp qGCp (+GCpi) (-GCpi) 11.75 16.64 0.80 11.32 8.32 14.31 0.00 16.64 0.80 11.32 8.32 14.31 0.00 16.64 0.80 11.32 8.32 14.31 0.00 16.64 0.80 11.32 8.32 14.31 11.75 16.64 -0.34 -4.88 -7.87 -1.88 Windward Roof (Positive)11.75 16.64 0.11 1.60 -1.40 4.59 Windward Roof (Negative)11.75 16.64 -0.38 -5.36 -8.36 -2.37 11.75 16.64 -0.57 -8.04 -11.04 -5.05 -9.64 -9.64 8.00 Longitudinal Transverse 1 11.750 2.750 9.00 95 108 Windward Wall Leeward Wall Leeward Roof Total Roof load, pr = MIN (SIN* pr , 8) = Level Height Height Above Below Wind Load (plf) Windward Wall Leeward Wall Leeward Roof Total Roof load, pr = MIN (SIN* pr , 8) = 9 PGA M : 0.68 SMS : 1.77 SM1 : 1.27 SDS : 1.18 SD1 : 0.85 T L : 8 SS : 1.52 S1 : 0.59 VS30 : 260 Seismic Design Category:D Multi-Period Design Spectrum S (g) vs T(s)a Multi-Period MCE SpectrumR S (g) vs T(s)a Two-Period Design Spectrum S (g) vs T(s)a Two-Period MCE SpectrumR S (g) vs T(s)a Design Vertical Response Spectrum Vertical ground motion data has not yet been made available by USGS. MCE Vertical Response SpectrumR Vertical ground motion data has not yet been made available by USGS. Seismic DefaultSite Soil Class: Results: Page 3 of 5https://ascehazardtool.org/Mon Feb 10 202510 SEISMIC LOAD ASCE 7-16 Risk Category II Importance Factor (I) 1.00 Site Class D - Default Seismic Design Category D Response Spectral Acc. (0.2 sec) (Ss) =1.520 Response Spectral Acc. (1.0 sec) (S1) =0.590 Fa =1.200 Fv =1.71 Max. Considered earthquake acc. SMS 1.770 Max. Considered earthquake acc. SM1 1.270 Design spectral acc. At short period S DS 1.180 Design spectral acc. at 1s period SD1 0.847 Response modification coefficient (R) 6.5 System overstrength coefficient (Ω)2.5 Building period coeficient (CT) =0.02 Building Height (ft) 14.5 (65ft maximum) Building period T=Ta (sec)0.149 Long Period Transition Period (TL) =8 Minimum Cs 0.052 Maximum Cs 0.876 Seismic response coefficient C s 0.182 Adjusted Cs 0.182 Design Base Shear V = 0.182W 11 12 BUILING WEIGHT Section A Roof Roof/ Floor Weight: P floo = A*(Q partion + Q floor/roo )Wall Weight Pwall = Qwall * hwall *L perimeter Area (A) = 1222 sqft Qwall = 15 psf Q partion = 5 psf hwall = 5.875 ft Q floor/roof = 15 psf Lperimeter = 142 ft P floo =24440 lbs Pwall = 12514 lbs Cs =0.182 ta =0.149 Total Weight, W = 3695 lbs k =1.000 V = CsW = 6709 lbs SDS =1.180 Shear Wall Force Linear Forces for Shear Wall hxwx Area Qe (psf) Section hx (ft)wx (lbs)hxwx (ft-lbs)hxwx CvxV A 9.0 36,954 332584 1.00 6,709 1000.0 6.71 0 0 0.00 0 0.00 0 0 0 13 SHEAR LINE LOAD Story Section Qe (psf)Long. (plf) Tran. (plf) 1 A 6.71 95 108 0 Longitudinal Seismic Wind Line Section Tributary Width (ft) Tributary Depth Shear Line Above Offset (ft)Distance to shear wall (ft)Seismic (psf)Diaphragm Load (lbs) Load from Above (ft) Load on Wall (lbs) Total Load (lbs)Wind (plf)Diaphragm Load (lbs) Load from Above (ft) Load on Wall (lbs) Total Load (lbs) L1 A 9.04 47.67 6.71 2891 0 0 2891 95 858 0 858 L2 A 9.04 47.67 6.71 2891 0 0 2891 95 858 0 0 858 L2 A 2.75 25.17 6.71 464 0 0 464 95 261 0 0 261 L3 A 2.75 25.17 6.71 464 0 0 464 95 261 0 0 261 Transvers Seismic Wind Line Section Tributary Width (ft) Tributary Depth Shear Line Above Offset (ft)Distance to shear wall (ft)Seismic (psf)Diaphragm Load (lbs) Load from Above (ft) Load on Wall (lbs) Total Load (lbs)Wind (plf)Diaphragm Load (lbs) Load from Above (ft) Load on Wall (lbs) Total Load (lbs) T1 A 11.25 18.08 6.71 1365 0 0 1365 108 1215 0 0 1215 T2 A 11.25 18.08 6.71 1365 0 0 1365 108 1215 0 0 1215 T2 A 12.58 23.58 6.71 1990 0 0 1990 108 1359 0 0 1359 T3 A 12.58 23.58 6.71 1990 0 0 1990 108 1359 0 0 1359 Seismic Wind, Long Seismic Wind, Tran Line lbs lbs Line lbs lbs L1 2891 858 T1 1365 1215 L2 3355 1118 T2 3355 2575 L3 464 261 T3 1990 1359 Wind Load 14 SHEAR WALLS Longitudinal Note: For "Special Case", lateral analysis are provided on following pages E W LINE Total Length Shear Shear per ft.Shear Shear per ft. SD, v (plf)Model # lbs Min. Thickness Strap lbs Min. Thickness L1 8.000 2891 361 858 107 A 200 SDS =1.180 HDU2 3075 3.5 CS16 1705 1.5 L2 8.000 3355 419 1118 140 B 340  =1.3 HDU4 4565 3.5 CS14 2490 3 L3 7.330 464 63 261 36 C 510 0 =2.50 HDU5 5645 3.5 CMST16 4990 3 D 665 Cd =4 HDU8 5980 3.5 CMST14 6475 3.5 E 870 HDU8 6970 3.5 CMST12 9215 3.5 b h h / b MIN [ 2 b / h , 1 ] Q w Q f d D w = Q w * d * b / 2 D f = Q f * h * b / 2 E 0.7  E U i = h *  E U i + 1 U n = ( .7  U i + U i + 1 ) - (0 . 6 - .14 S DS )( D w + D f )  W 0.6 n W U i = h *  W U i + 1 U n = .6 U i + U i + 1 - .6 ( D w + D f ) Line Length Height Aspect Ratio Reduction Factor Wall Load Floor Load Tributary Depth Resisting Dead Load Wall Resisting Dead Load Floor Shear ASD Shear Uplift Uplift From Above Net Uplift Shear ASD Shear Uplift Uplift From Above Net Uplift Shear Type Floor To Floor Foundation Hold Down L1 8.00 9.00 1.13 1.00 15 15 1.33 540 80 361 329 3252 2690 107 64 965 207 B CMST16 HDU2 L2 8.00 9.00 1.13 1.00 15 15 1.33 540 80 419 382 3775 3165 140 84 1258 383 C CMST16 HDU4 L3 7.33 9.00 1.23 1.00 15 15 1.33 495 73 63 58 570 272 36 21 320 -149 A CS16 HDU2 Transverse VE VW LINE Total Length Shear Shear per ft.Shear Shear per ft.Note: For "Special Case", lateral analysis are provided on following pages T1 8.00 1365 171 1215 152 T2 8.00 3355 419 2575 322 T3 4.75 1990 419 1359 286 b h h / b MIN [ 2 b / h , 1 ] Q w Q f d D w = Q w * d * b / 2 D f = Q f * h * b / 2 E 0.7  E U i = h *  E U i + 1 U n = ( .7  U i + U i + 1 ) - (0 . 6 - .14 S DS )( D w + D f )  W 0.6 n W U i = h *  W U i + 1 U n = .6 U i + U i + 1 - .6 ( D w + D f ) Line Length Height Aspect Ratio Reduction Factor Wall Load Floor Load Tributary Depth Resisting Dead Load Wall Resisting Dead Load Floor Shear ASD Shear Uplift Uplift From Above Net Uplift Shear ASD Shear Uplift Uplift From Above Net Uplift Shear Type Floor To Floor Foundation Hold Down T1 8.00 9.00 1.13 1.00 15 15 9 540 540 171 155 1535 927 152 91 1367 172 A CS16 HDU2 T2 8.00 9.00 1.13 1.00 15 15 9 540 540 419 382 3774 2965 322 193 2896 1090 C CMST16 HDU2 T3 4.75 9.00 1.89 1.00 15 15 6 321 214 419 381 3771 3199 286 172 2575 1224 C CMST16 HDU4 15 FOUNDATION: ADU 1500 psf Trib Trib Wall Height DL(psf) LL(psf) roof(ft) DL(psf) LL(psf) floor(ft) DL(psf) wall(ft) 15 20 11.5 15 9 Roof: (DL+LL) (Trib) = 402.5 plf Floor: (DL+LL) (Trib) = 0 plf Wall: DL (Height)= 135 plf 537.5 plf 537.5 /(12"/12) = 537.5 psf< 1500 psf P(allowable) P(allowable) = 5634.75 # 12 " Allowable soil bearing value: Roof Floor use 12" wide cont. ftg w/ 2-#4 top & bott. 16 CITY OF SANTA ANA Planning and Building Agency National Flood Insurance Progra Elev;ltlo0 Approved FOR PERMIT ISSUANCE Master ID: Date: Certificate and Instructions 2023 EDITION -f. DT (0 l4ND 1 10 a �V� VOILI U.S. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE AND INSTRUCTIONS CITY OF SANTA ANA PlanntcF3Mfid�4ccApjency Ex iration Date: 06/30/ 026 Approved FOR PERMIT ISSUANCE PAPERWORK REDUCTION ACT NOTICE 6 ---- Public reporting burden for this data collection is estimated to average 3.75 hours per response. The burden EsAMIreip0des the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and com I ain�q and submitting this form. You are not required to respond to this collection of information unless a valid OMB control number is display o�5`Lfiis form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to: Information Clollections Management, Department of Homeland Security, Federal Emergency Management Agency, 500 C Street SW, Washington, DC 20742, Paperwork Reduction Project (1660-0008). NOTE: Do not send your completed form to this address. PRIVACY ACT STATEMENT Authority: Title 44 CFR § 61.7 and 61.8. Principal Purpose(s): This information is being collected for the primary purpose of documenting compliance with National Flood Insurance Program (NFIP) floodplain management ordinances for new or substantially improved structures in designated Special Flood Hazard Areas. This form may also be used as an optional tool for a Letter of Map Amendment (LOMA), Conditional LOMA (CLOMA), Letter of Map Revision Based on Fill (LOMR-F), or Conditional LOMR-F (CLOMR-F), or for flood insurance rating purposes in any flood zone. Routine Use(s): The information on this form may be disclosed as generally permitted under 5 U.S.C. § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/ FEMA-003 — National Flood Insurance Program Files System of Records Notice 79 Fed. Reg. 28747 (May 19, 2014) and upon written request, written consent, by agreement, or as required by law. Disclosure: The disclosure of information on this form is voluntary; however, failure to provide the information requested may impact the flood insurance premium through the NFIP. Information will only be released as permitted by law. PURPOSE OF THE ELEVATION CERTIFICATE The Elevation Certificate is an important administrative tool of the NFIP. It can be used to provide elevation information necessary to ensure compliance with community floodplain management ordinances, to inform the proper insurance premium, and to support a request for a LOMA, CLOMA, LOMR-F, or CLOMR-F. The Elevation Certificate is used to document floodplain management compliance for Post -Flood Insurance Rate Map (FIRM) buildings, which are buildings constructed after publication of the FIRM, located in flood Zones Al—A30, AE, AH, AO, A (with Base Flood Elevation (BFE)), VE, V1—V30, V (with BFE), AR, AR/A, AR/AE, AR/A1—A30, AR/AH, AR/AO, and A99. It may also be used to provide elevation information for Pre -FIRM buildings or buildings in any flood zone. As part of the agreement for making flood insurance available in a community, the NFIP requires the community to adopt floodplain management regulations that specify minimum requirements for reducing flood losses. One such requirement is for the community to obtain the elevation of the lowest floor (including basement) of all new and substantially improved buildings, and maintain a record of such information. The Elevation Certificate provides a way for a community to document compliance with the community's floodplain management ordinance. Use of this certificate does not provide a waiver of the flood insurance purchase requirement. Only a LOMA or LOMR-F from the Federal Emergency Management Agency (FEMA) can amend the FIRM and remove the federal mandate for a lending institution to require the purchase of flood insurance. However, the lending institution has the option of requiring flood insurance even if a LOMA/LOMR-F has been issued by FEMA. The Elevation Certificate may be used to support a LOMA, CLOMA, LOMR-F, or CLOMR-F request. Lowest Adjacent Grade (LAG) elevations certified by a land surveyor, engineer, or architect, as authorized by state law, will be required if the certificate is used to support a LOMA, CLOMA, LOMR-F, or CLOMR-F request. A LOMA, CLOMA, LOMR-F, or CLOMR-F request must be submitted with either a completed FEMA MT-EZ or MT-1 application package, whichever is appropriate. If the certificate will only be completed to support a LOMA, CLOMA, LOMR-F, or CLOMR-F request, there is an option to document the certified LAG elevation on the Elevation Form included in the MT-EZ and MT-1 application. This certificate is used only to certify building elevations. A separate certificate is required for floodproofing. Under the NFIP, non-residential buildings can be floodproofed up to or above the BFE. A floodproofed building is a building that has been designed and constructed to be watertight (substantially impermeable to floodwaters) below the BFE. Floodproofing of residential buildings is not permitted under the NFIP unless FEMA has granted the community an exception for residential floodproofed basements. The community must adopt standards for design and construction of floodproofed basements before FEMA will grant a basement exception. For both floodproofed non-residential buildings and residential floodproofed basements in communities that have been granted an exception by FEMA, a floodproofing certificate is required. The expiration date on the form herein does not apply to certified and completed Elevation Certificates, as a completed Elevation Certificate does not expire, unless there is a physical change to the building that invalidates information in Section A Items A8 or A9, Section C, Section E, or Section H. In addition, this form is intended for the specific building referenced in Section A and is not invalidated by the transfer of building ownership. Additional guidance can be found in FEMA Publication 467-1, Floodplain Management Bulletin: Elevation Certificate. FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 1 of 8 U.S. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION Copy all pages of this Elevation Certificate and all attachments for (1) community official, (2) insurance age CITY OF SANTA ANA Plann tcF3M�iITWJ0AFjency Ex iration Date: 06/30/ 026 Approved FOR PERMIT ISSUANCE iES 1-11 ipany, and (3) building owner. SECTION A - PROPERTY INFORMATION FOR IW~f COMPANY USE Al. Building Owner's Name: Diem Le & Tao Pham Polic IQum&er: A2. Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: Company NAIC Number: 1126 Elaine Drive, Unit #2 City: Santa Ana State: CA ZIP Code: 92703 A3. Property Description (e.g., Lot and Block Numbers or Legal Description) and/or Tax Parcel Number: Lot 43, Tract No. 1830, M.M. 55/1-3, APN No. 198-022-03 A4. Building Use (e.g., Residential, Non -Residential, Addition, Accessory, etc.): Residential - ADU A5. Latitude/Longitude: Lat. 33.75518' Long.-117.92300' Horiz. Datum: ❑ NAD 1927 ® NAD 1983 ❑ WGS 84 A6. Attach at least two and when possible four clear color photographs (one for each side) of the building (see Form pages 7 and 8). A7. Building Diagram Number: 1 B A8. For a building with a crawlspace or enclosure(s): a) Square footage of crawlspace or enclosure(s): sq. ft. b) Is there at least one permanent flood opening on two different sides of each enclosed area? ❑ Yes ❑ No ❑ N/A c) Enter number of permanent flood openings in the crawlspace or enclosure(s) within 1.0 foot above adjacent grade: Non -engineered flood openings: Engineered flood openings: d) Total net open area of non -engineered flood openings in A8.c: sq. in. e) Total rated area of engineered flood openings in A8.c (attach documentation - see Instructions): sq. ft. f) Sum of A8.d and A8.e rated area (if applicable - see Instructions): sq. ft. A9. For a building with an attached garage: a) Square footage of attached garage: sq. ft. b) Is there at least one permanent flood opening on two different sides of the attached garage? ❑ Yes ❑ No ❑ N/A c) Enter number of permanent flood openings in the attached garage within 1.0 foot above adjacent grade: Non -engineered flood openings: Engineered flood openings: d) Total net open area of non -engineered flood openings in A9.c: sq. in. e) Total rated area of engineered flood openings in A9.c (attach documentation - see Instructions): sq. ft. f) Sum of A9.d and A9.e rated area (if applicable - see Instructions): sq. ft. SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION B1.a. NAP Community Name: Santa Ana B1.b. NFIP Community Identification Number: 060232 B2. County Name: Orange B3. State: CA B4. Map/Panel No.: 06059CO143 B5. Suffix: J B6. FIRM Index Date: 09/15/1989 B7. FIRM Panel Effective/Revised Date: 12/03/2009 B8. Flood Zone(s): A B9. Base Flood Elevation(s) (BFE) (Zone AO, use Base Flood Depth): 78.02 FT B10. Indicate the source of the BFE data or Base Flood Depth entered in Item B9: ❑ FIS ❑ FIRM ❑ Community Determined M Other: Hydraulic method in FEMA P-265 manual B11. Indicate elevation datum used for BFE in Item B9: ❑ NGVD 1929 M NAVD 1988 ❑ Other/Source: B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes ❑ No Designation Date: ❑ CBRS ❑ OPA B13. Is the building located seaward of the Limit of Moderate Wave Action (LiMWA)? ❑ Yes ❑ No FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 2 of 8 ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION CITY OF SANTA ANA Planning and Building Agency Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: FOR INSURAIW ""L&E 1126 Elaine Drive, Unit#2 Polic NuF„Q :PERMIT ISSUAN City: Santa Ana State: CA ZIP Code: 92703 Company NAIC Number: SECTION C — BUILDING ELEVATION INFORMATION (SURVEY REQU IALqjJer ID: C1. Building elevations are based on: ® Construction Drawings* ❑ Building Under Construction Finished Construction *A new Elevation Certificate will be required when construction of the building is complete. C2. Elevations — Zones Al—A30, AE, AH, AO, A (with BFE), VE, VI—V30, V (with BFE), AR, AR/A, AR/AE, AR/A1—A30, AR/AH, AR/AO, A99. Complete Items C2.a—h below according to the Building Diagram specified in Item A7. In Puerto Rico only, enter meters. Benchmark Utilized: SA-226-70 (ELE: 74.189 ft, 2005) Vertical Datum: NAVD88 Indicate elevation datum used for the elevations in items a) through h) below. ❑ NGVD 1929 ® NAVD 1988 ❑ Other: Datum used for building elevations must be the same as that used for the BFE. Conversion factor used? ❑ Yes ® No If Yes, describe the source of the conversion factor in the Section D Comments area. Check the measurement used: a) Top of bottom floor (including basement, crawlspace, or enclosure floor): 81.50 ® feet ❑ meters b) Top of the next higher floor (see Instructions): N/A ❑ feet ❑ meters c) Bottom of the lowest horizontal structural member (see Instructions): N/A ❑ feet ❑ meters d) Attached garage (top of slab): N/A ❑ feet ❑ meters e) Lowest elevation of Machinery and Equipment (M&E) servicing the building (describe type of M&E and location in Section D Comments area): N/A ® feet ❑ meters f) Lowest Adjacent Grade (LAG) next to building: ❑ Natural ® Finished 80.33 ® feet ❑ meters g) Highest Adjacent Grade (HAG) next to building: ❑ Natural ® Finished 80.92 ® feet ❑ meters h) Finished LAG at lowest elevation of attached deck or stairs, including structural support: N/A ❑ feet ❑ meters SECTION D — SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by state law to certify elevation information. / certify that the information on this Certificate represents my best efforts to interpret the data available. I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001. Were latitude and longitude in Section A provided by a licensed land surveyor? ❑ Yes ® No ❑ Check here if attachments and describe in the Comments area. Certifier's Name: Lan Pham License Number: C29595 Title: Chief Engineer Company Name: Lan & Associates OQROFESSIpN� Pyq !may Address: 13139 Harbor Boulevard y W No.29595 m City: Garden Grove State: CA ZIP Code: 92843 Exp; 3/31/27 M Telephone: (714) 414-9215 Ext.: Email: lanpham9@hotmail.com s cnm �p lglF �Q� OF C AL\F Signature: ---- Date: 04/16/2025 Copy all pages of this Elevation Certificate and all attachments for (1) community official, (2) insurance agent/company, and (3) building owner. Comments (including source of conversion factor in C2; type of equipment and location per C2.e; and description of any attachments): No FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 3 of 8 ELEVATION CERTIFICATE IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION CITY OF SANTA ANA Planning and Building Agency Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: FOR INSURAN"""4dSE 1126 Elaine Drive, Unit #2 Polic Nu a Frpe� PERMIT ISSUAN City: Santa Ana State: CA ZIP Code: 92703 Company NAIC Number: SECTION E — BUILDING MEASUREMENT INFORMATION (SURVEY NOT R FOR ZONE AO, ZONE AR/AO, AND ZONE A (WITHOUT BFE) Date: For Zones AO, AR/AO, and A (without BFE), complete Items E1—E5. For Items E1—E4, use natural grade, i intended to support a Letter of Map Change request, complete Sections A, B, and C. Check the measurement used. In Puerto Rico only, enter meters. Building measurements are based on: ® Construction Drawings* ❑ Building Under Construction* ❑ Finished Construction *A new Elevation Certificate will be required when construction of the building is complete. E1. Provide measurements (C.2.a in applicable Building Diagram) for the following and check the appropriate boxes to show whether the measurement is above or below the natural HAG and the LAG. a) Top of bottom floor (including basement, crawlspace, or enclosure) is: 0.58 ® feet ❑ meters ® above or ❑ below the HAG. b) Top of bottom floor (including basement, crawlspace, or enclosure) is: 1.17 ® feet ❑ meters ® above or ❑ below the LAG. E2. For Building Diagrams 6-9 with permanent flood openings provided in Section A Items 8 and/or 9 (see pages 1-2 of Instructions), the next higher floor (C2.b in applicable Building Diagram) of the building is: N/A ❑ feet ❑ meters ❑ above or ❑ below the HAG. E3. Attached garage (top of slab) is: N/A ❑ feet ❑ meters ❑ above or ❑ below the HAG. E4. Top of platform of machinery and/or equipment servicing the building is: N/A ❑ feet ❑ meters ❑ above or ❑ below the HAG. E5. Zone AO only: If no flood depth number is available, is the top of the bottom floor elevated in accordance with the community's floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown The local official must certify this information in Section G. SECTION F — PROPERTY OWNER (OR OWNER'S AUTHORIZED REPRESENTATIVE) CERTIFICATION The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without BFE) or Zone AO must sign here. The statements in Sections A, B, and E are correct to the best of my knowledge ❑ Check here if attachments and describe in the Comments area. Property Owner or Owner's Authorized Representative Name: Diem Le & Tao Pham Address: 1126 Elaine Drive City: Santa Ana State: CA ZIP Code: 92703 Telephone: Ext.: Email: Signature: Date: Comments: =E FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 4 of 8 CITY OF SANTA ANA ELEVATION CERTIFICATE Planning and Building Agency IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION PAGE 1-11 Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: FOR INSURAIW ""L&E 1126 Elaine Drive, Unit#2 Polic NuF„Q :PERMIT ISSUAN City: Santa Ana State: CA ZIP Code: 92703 Company NAIC Number: SECTION G — COMMUNITY INFORMATION (RECOMMENDED FOR COMMUNITY OF 6JAIttfid&PLETION, The local official who is authorized by law or ordinance to administer the community's floodplain managem nt ordinance can complete Section A, B, C, E, G, or H of this Elevation Certificate. Complete the applicable item(s) and sign below whim! G1. ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who is authorized by state law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area below.) G2.a. ❑ A local official completed Section E for a building located in Zone A (without a BFE), Zone AO, or Zone AR/AO, or when item E5 is completed for a building located in Zone AO. G2.b. ❑ A local official completed Section H for insurance purposes. G3. ❑ In the Comments area of Section G, the local official describes specific corrections to the information in Sections A, B, E and H. G4. ❑ The following information (Items G5—G11) is provided for community floodplain management purposes. G5. Permit Number: G6. Date Permit Issued: G7. Date Certificate of Compliance/Occupancy Issued: G8. This permit has been issued for: ❑ New Construction ❑ Substantial Improvement G9.a. Elevation of as -built lowest floor (including basement) of the building: ❑ feet ❑ meters Datum: G9.b. Elevation of bottom of as -built lowest horizontal structural member: ❑ feet ❑ meters Datum: G10.a. BFE (or depth in Zone AO) of flooding at the building site: ❑ feet ❑ meters Datum: G10.b. Community's minimum elevation (or depth in Zone AO) requirement for the lowest floor or lowest horizontal structural member: ❑ feet ❑ meters Datum: G11. Variance issued? ❑ Yes ❑ No If yes, attach documentation and describe in the Comments area. The local official who provides information in Section G must sign here. I have completed the information in Section G and certify that it is correct to the best of my knowledge. If applicable, I have also provided specific corrections in the Comments area of this section. Local Official's Name: Title: NFIP Community Name: Telephone: Ext.: Email: Address: City: State: ZIP Code: Signature: Date: Comments (including type of equipment and location, per C2.e; description of any attachments; and corrections to specific information in Sections A, B, D, E, or H): No FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 5 of 8 CITY OF SANTA ANA ELEVATION CERTIFICATE Planning and Building Agency IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION PAGE 1-11 Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: FOR INSURANW ""L&E 1126 Elaine Drive, Unit #2 Polic Nu a FnQf PERMIT ISSUAN City: Santa Ana State: CA ZIP Code: 92703 Company NAIC Number: SECTION H — BUILDING'S FIRST FLOOR HEIGHT INFORMATION FORA LN�!0#D: (SURVEY NOT REQUIRED) (FOR INSURANCE PURPOSES ONL )Date: The property owner, owner's authorized representative, or local floodplain management official may comp) to determine the building's first floor height for insurance purposes. Sections A, B, and I must also be completed. Enter heights to the nearest tenth of a foot (nearest tenth of a meter in Puerto Rico). Reference the Foundation Type Diagrams (at the end of Section H Instructions) and the appropriate Building Diagrams (at the end of Section I Instructions) to complete this section. H1. Provide the height of the top of the floor (as indicated in Foundation Type Diagrams) above the Lowest Adjacent Grade (LAG): a) For Building Diagrams 1A, 1B, 3, and 5-8. Top of bottom ❑ feet ❑ meters ❑ above the LAG floor (include above -grade floors only for buildings with crawlspaces or enclosure floors) is: b) For Building Diagrams 2A, 213, 4, and 6-9. Top of next ❑ feet ❑ meters ❑ above the LAG higher floor (i.e., the floor above basement, crawlspace, or enclosure floor) is: H2. Is all Machinery and Equipment servicing the building (as listed in Item H2 instructions) elevated to or above the floor indicated by the H2 arrow (shown in the Foundation Type Diagrams at end of Section H instructions) for the appropriate Building Diagram? ❑ Yes ❑ No SECTION I — PROPERTY OWNER (OR OWNER'S AUTHORIZED REPRESENTATIVE) CERTIFICATION The property owner or owner's authorized representative who completes Sections A, B, and H must sign here. The statements in Sections A, B, and H are correct to the best of my knowledge. Note: If the local floodplain management official completed Section H, they should indicate in Item G2.b and sign Section G. ❑ Check here if attachments are provided (including required photos) and describe each attachment in the Comments area. Property Owner or Owner's Authorized Representative Name: Address: City: State: ZIP Code: Telephone: Ext.: Email: Signature: Date: Comments: =E FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 6 of 8 ELEVATION CERTIFICATE CITY OF SANTA ANA Planning and Building Agency IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION BUILDING PHOTOGRAPHS See Instructions for Item A6. Approved Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: FOR IN 1126 Elaine Drive, Unit #2 Polic Number: City: Santa Ana State: CA ZIP Code: 92703 Master ID: Com a�y �IAIC Number: a e: Instructions: Insert below at least two and when possible four photographs showing each side of the buildin for example, may only be able to take front and back pictures of town houses/rowhouses). Identify all photographs with the date taken and "Front View," 'Rear View," "Right Side View," or "Left Side View." Photographs must show the foundation. When flood openings are present, include at least one close-up photograph of representative flood openings or vents, as indicated in Sections A8 and A9. Photo One Photo One Caption: Clear Photo One Photo Two Photo Two Caption: Clear Photo Two No FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 7 of 8 ELEVATION CERTIFICATE CITY OF SANTA ANA Planning and Building Agency IMPORTANT: MUST FOLLOW THE INSTRUCTIONS ON INSTRUCTION BUILDING PHOTOGRAPHS Continuation Page Approved Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.: FOR IN 1126 Elaine Drive, Unit #2 Polic Number: City: Santa Ana State: CA ZIP Code: 92703 Master ID: Com a�y eI IC Number: a e: Insert the third and fourth photographs below. Identify all photographs with the date taken and "Front View, 'Rear View," "Right Side View," or "Left Side View." When flood openings are present, include at least one close-up photograph of representative flood openings or vents, as indicated in Sections A8 and A9. Photo Three Photo Three Caption: Clear Photo Three Photo Four Photo Four Caption: Clear Photo Four gig FEMA Form FF-206-FY-22-152 (formerly 086-0-33) (8/23) Form Page 8 of 8 CITY OF SANTA ANA may, lS. Section 1: Discharge — Drainage area relationship Approved FOR PERMIT ISSUAN E As shown on table 10 of the Flood Insurance Study Report — Orange County, Cali • Drainage area of East Garden Grove — Wintersburg Channel at Euclid Street is r/NDa aQ:miles. Date: • Peak discharge (l% annual chance): 1,600 cfs. Section 2: Flood zone information Zone A, city of Santa Ana, map number 06059C0143J, panel 143 of 539, map revised December 3, 2009. Section 3: Benchmark OC PW Survey BM No.: SA-226-70. Elevation: 74.189 ft, NAVD88. Year leveled: 2005. O.C.S. 1995 A.D.J. Location: monument is located in the southwest corner of the intersection of Newhope Street and Hazard Avenue, 32 ft. southerly of the centerline of Hazard Avenue and 4 ft. westerly of the west southwest curb return. Monument is set level with the sidewalk. Section 4: East Garden Grove Wintersburg Channel (C05) section �rV ELE. = 77.02' 2� Fxisf. grourrra� , �k Hi z CONS7 CONC, L INE1t � CXANWtL �! = 67.02' BE,QMs, FO/� L7Cr�4�L�.8s�P,�c�/�E air zy. 6Icancr. irriy. pipe r'~8* 1 Gm CZda f wo//s. A& removed offer' use for wafer cnniro/. TYPICAL SECTION STA.469+00.00 TO STA.493+00.00 CITY OF SANTA ANA CYI Section 5: Base Flood Elevation Approved FOR PERMIT ISSUAN E Per "A Guide for Obtaining and Developing Base (100-year) Flood Elevations" published by FEMA in April 1995, since this is a development of less than 5 acres project, the "Normal Dep is adequate for determining Base Flood Elevation (BFE). Date: Normal depth is the depth expected for a stream when the flow is uniform, steady, one dimensional, and is not affected by downstream obstructions or flow changes. For uniform flow, the channel bottom slope, water -surface slope, and energy slope are parallel and are, therefore, equal. For normal depth computations, the flow is considered steady because the discharge is assumed to be constant; therefore, the depth of flow does not change during the time interval under consideration. Normal depth calculation computes BFE at a cross section. The standard formula for determining normal depth at a cross section is Manning's formula. Manning equation: Q= (1.49/n) x A x R11 x S12 A = 230 SF R = A/P = 230/44 = 5.227 ft S = 0.0118 n = 0.03 Qca1= 3,737 cfs > Qioo= 1,600 cfs. 4 BFE = 67.02 + 10 = 77.02 ft. Adding 1' for safety, we can interpolate a BFE of 78.02' will be sufficient to protect against flooding during a 100-year event CITY OF SANTA ANA Planning and Building Agency may, lS. Approved FOR PERMIT ISSUANCE Master ID. Date: c N C o 0 0 0 0 0 0 0 0 0 O C L N Cfl O 14i N C (3) — V CO QU C LO Ln CY) CM CY) co CY) CC O O O 0 O 0 O O 0 0 Q IO C Ln I- 'I Cfl (O L0 Cl) Cl) CO M m o U d' N N � I Cl 0 m U U � C C C O O O O O O O O C) O N m Q L0 r m N C)Cl)N LO W U C6 C N CO 7 N C C C CD CD O O O O C)O C)O Q (O t� CD000 _ 04 OO 0 'T 't It — C LO �U 0 N N co Cfl N O 00 N I� O CF) Q CO C`M CM N N O rl L6 ❑ `) p O J + E_ MO•� ca 2 C O U m a) O a C N C — E a) >, CO CO CO J` 0)N 0 m a)Cn U .O C O N a) Q> > Q O O 0 O CD Cn O m O a) ILO L C 0 E OU .- �_ W +) Cn O J C L p l4 E = X O U V to > 0� C '� O 0 CO (O N OL R7 O O i-" 7 O U Qom❑ Cn . Qaf 2 CL U Q Q a +- O Q W Q Qm Q Q Q a?2 N L C O CU (U (U N N Cll (U a) N a)CD N N Cll N a) C O N L C O N L Cm L U— L U— L U— L U— L U— L U— L U— L U — �N — C O C -> C D S Q C S C S C S C Q C S C C CQ >O O >, (O >, (O >, CO >, IO >, CO >, IO >. CO >, CO Cn O C N in O C (O _ LL O� UU O C 00 O= U U O L U 0 0= 00 O L U 0 O L 00 O L U U O L- W C7 0 W U 0 CM O 25$1*( &2817< ),5( $87+25,7< 3ODQ6XEPLWWDO&ULWHULD)RUP 5HTXLUHGIRU6LQJOH)DPLO\RU'XSOH[5HVLGHQFHV 8VH&RPPHUFLDOIRUPIRUORWVZLWKGZHOOLQJXQLWVRUQHZUHVLGHQWLDOWUDFWV  &RPSOHWHWKH3URMHFW,QIRUPDWLRQDQG4XHVWLRQQDLUHEHORZWKHQVLJQDQGGDWHWKH$SSOLFDQW&HUWLILFDWLRQ 3URMHFW,QIRUPDWLRQ …1HZ6LQJOH)DPLO\5HVLGHQFH'XSOH[ …GGLWLRQ5HPRGHO…'8…2WKH  8QLW &LW\RU8QLQFRUSRUDWHG&RXQW\$UHD =,3 6FRSHRI:RUN ([LVWLQJ UHD $UHDWR EH$GGHG 7RWDO5HVXOWLQJ UHD 6WRULHV $UHD$GGHGLQ3DVW<HDUV  H[FOXGLQJWKLVSURMHFW  <HV 1R 4XHVWLRQQDLUH 2&)$3ODQ7\SHLI³<HV´ ……1HZ²,VWKLVDQHZVLQJOHIDPLO\UHVLGHQFHRUGXSOH[" 35 5HVLGHQWLDO6LWH ZLWK:DWHU$YDLODELOLW\ 35 )LUH6SULQNOHU ……$'8²,VWKLVDQHZ$FFHVVRU\'ZHOOLQJ8QLW $'8 RQWKHVDPHSURSHUW\DVDKRXVHWKDWDOUHDG\KDV ILUHVSULQNOHUVRUDKRXVHWKDWZLOOKDYHILUHVSULQNOHUVDGGHGDVSDUWRIWKLVSURMHFW" 35 )LUH6SULQNOHU ……$GGLWLRQ,VWKLV $ DQDGGLWLRQWRDFXUUHQWO\VSULQNOHUHGEXLOGLQJRU % DQDGGLWLRQUHTXLULQJDILUH VSULQNOHUUHWURILWEDVHGRQDWKUHVKROGVHWE\ORFDORUGLQDQFH" 35 )LUH6SULQNOHU ……'LVWDQFH²,VWKHPRVWUHPRWHSRUWLRQRIWKHDGGLWLRQ$'8RURWKHUGHWDFKHGVWUXFWXUHJUHDWHUWKDQ IHHWIURPWKHILUHDFFHVVURDGZD\" 35 5HVLGHQWLDO6LWH ……7RWDO$UHD²:LOOWKHDGGLWLRQUHVXOWLQDWRWDODUHDRIJUHDWHUWKDQVTXDUHIHHW VI IRUQRQ VSULQNOHUHGEXLOGLQJVRUJUHDWHUWKDQVIIRUVSULQNOHUHGEXLOGLQJVLQFOXGLQJWKHDUHDRIDOO HQFORVHGVSDFHVVXFKDVJDUDJHVVWDLUVDQGGHWDFKHGVWUXFWXUHVVHSDUDWHGE\OHVVWKDQIHHW" 35 5HVLGHQWLDO6LWH ZLWK:DWHU$YDLODELOLW\ ……5HPRGHO,VWKLVDUHPRGHORIDVSULQNOHUHGEXLOGLQJZLWKDVFRSHRIZRUNWKDWLQFOXGHVDGGLQJRU UHPRYLQJDQ\LQWHULRUZDOOV"1RWH,I³<HV´WKHQSURMHFWPXVWEHHYDOXDWHGE\D&OLFHQVHG FRQWUDFWRUWRGHWHUPLQHLIDILUHVSULQNOHUPRGLILFDWLRQLVQHHGHG 35 )LUH6SULQNOHU ……'HWDFKHG6WUXFWXUH,VWKLVDQHZGHWDFKHGXWLOLW\RUDFFHVVRU\VWUXFWXUH QRWDQ$'8 VXFKDVD JDUDJHZRUNVKRSJDPHURRPSRROKRXVHEDUQHWFUHTXLULQJILUHVSULQNOHUVEDVHGRQDWKUHVKROG VHWE\ORFDORUGLQDQFH" 35 5HVLGHQWLDO6LWH 35 )LUH6SULQNOHU ……*DWH,VDJDWHEHLQJLQVWDOOHGDFURVVDGULYHZD\RUURDGWKDWLVGHVLJQDWHGDVDILUHGHSDUWPHQW DFFHVVURDGZD\RUDGULYHZD\RUURDGWKDWVHUYHVPRUHWKDQDVLQJOHKRPHGXSOH[" 35 *DWH ……0HWKDQH²,VSURMHFWORFDWHGLQRUOHVVWKDQ¶IURPD³'LYLVLRQRI2LO*DVDQG*HRWKHUPDO 5HVRXUFHV´ '2**5 ILHOGERXQGDU\RUZHOO DFWLYHRUDEDQGRQHG OHVVWKDQIHHWIURPDQRLOJDV VHHSRUOHVVWKDQIHHWIURPDODQGILOO" 1RWH)RUSURMHFWVLQ<RUED/LQGDWKLVUHTXLUHPHQWRQO\ DSSOLHVWRQHZKRPHVHQFORVHGDFFHVVRU\VWUXFWXUHVDGGLWLRQWRH[LVWLQJVWUXFWXUHJUHDWHUWKDQ VIDQG'8¶V  35 5HVLGHQWLDO6LWH 35 0HWKDQH 7HVW0LWLJDWLRQ3ODQV ……9HJHWDWLRQ²,VWKHSURSHUW\VWUXFWXUH $ RQWKHSHULPHWHURIDFRPPXQLW\FRQWDLQLQJRUDGMDFHQWWR VORSHVRUKLOOVRU % DGMDFHQWWRDQRSHQVSDFHRUZLOGODQGDUHDFRQWDLQLQJQRQLUULJDWHGYHJHWDWLRQ RU & LQD6WDWH5HVSRQVLELOLW\$UHDRU/RFDO5HVSRQVLELOLW\$UHD³)LUH+D]DUG6HYHULW\=RQH´DV GHILQHGE\WKH6WDWHRU ' QHDUDQDUHDWKDWFRXOGEHDIIHFWHGE\DZLOGILUHLQWKHRSHQVSDFH 35 )XHO0RGLILFDWLRQ 35 $FFHVVRU\ 6WUXFWXUH 2&)$DSSURYDOUHTXLUHGEHIRUHLVVXDQFHRIDJUDGLQJEXLOGLQJSHUPLW$OORWKHUSODQVW\SHVPD\EHGHIHUUHGVXEPLWWDOV $SSOLFDQW&HUWLILFDWLRQ ,FHUWLI\XQGHUSHQDOW\RISHUMXU\XQGHUWKHODZVRIWKH6WDWHRI&DOLIRUQLDWKDWWKHLQIRUPDWLRQDERYHLVWUXH 3KRQH 1XPEHUBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB  (PDLOBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB $WWHQWLRQ%XLOGLQJ'HSDUWPHQW6WDII±$IWHU\RX¶YHYHULILHGDOOTXHVWLRQVZHUHDQVZHUHGDFFXUDWHO\DV³1R´WKHQ\RXPD\DFFHSWWKLVVLJQHGIRUPDVD ZULWWHQUHOHDVHWKDWDQ2&)$UHYLHZLVQRWUHTXLUHG,IDQ\TXHVWLRQVZHUHDQVZHUHGDV³<HV´WKHQWKHSODQW\SHRQWKHULJKWVLGHPD\EHUHTXLUHG BBBBBB,IDOODQVZHUVDUH³1R´DQGWKH%XLOGLQJ'HSDUWPHQWVWLOOUHTXLUHVWKHDSSOLFDQWWRKDYHWKHLUSODQVUHYLHZHGE\2&)$RULIDQ\DQVZHUVDUH³<HV´ DQGWKH%XLOGLQJ'HSDUWPHQWSUHIHUVIRU2&)$WRGHWHUPLQHLIDUHYLHZLVUHTXLUHGSOHDVHLQLWLDOWKLVOLQHDQGSURYLGHDQH[SODQDWLRQRQWKH3ODQ5HIHUUDO )RUP RQWKHUHYHUVH WREHVXEPLWWHGDORQJZLWKWKHDSSURSULDWHSODQVWR2&)$IRUDGHWHUPLQDWLRQ )RUTXHVWLRQVDQGVXEPLWWDOLQIRUPDWLRQSOHDVHYLVLWRFIDRUJRUFDOO2&)$DW   ^&Z ✔ Santa Ana 92703 $GGUHVV 1126 Elaine Dr Santa Ana CA 92703 1166 1000 2166 1 NO ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ 714-213-7608 ONETRANG10@GMAIL.COM 3ULQW1DPHBBBBBBTRANG HOBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB6LJQDWXUHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB'DWHBBB04/21/2025 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City Official Requesting Review: City Reference #: __________________________ City / County: _____________________________________ Date: __________________________________ Contact Name: _____________________________________ E-Mail: __________________________________ Title: _____________________________________ Phone #: _________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County: OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ Updated: 08/30/2021 Garden Grove Unified School District Certification of Compliance Payment of School Facility Fees Developer/Applicant CITY OF SANTA ANA Planning and Building Agency No. R429 pproved FOR PERMIT ISSUANCE Master ID: Address W-1 �% c�7� a t h f DDv-3,a ti Telephone Number ((p5�) TOO ?j1-71 Project Location ` a.S b#Wi Street Address City ZIP Elem. School Int High School Thomas Map No. ----------------------------------------------------------------------- Number of Square Feet of Residential Space 1,00 Number of Square Feet / of Commercial and Industrial Space / X Total $ Total $ The above representations as to square footage are true. Developer/Applicant agrees that if it is later determined that such representations are not true then this certificate shall automatically terminate and the appropriate City/County shall be notified. Applicant is hereby noticed that any party filing a protest regarding the imposition of fees pursuant to Government Code Section 65995 and Education Code Section 17620 must do so within 90 days from the payment of the fee. Date Developer/Applicant Receipt of Payment This certifies that the above -named Developer/Applicant has paid school facility fees in compliance with Government Code Section 65995 and Education Code Section 17620. These fee have been received from F l7 {-W,I �_ '�ti1'fL 120!Lf � qQ V kffil IAC �� bne hundrrl 5�,,�eik 4yla '0/[()() Dollars $ 5, i♦� Cash Check ✓ Check No. Bank CJ\ V_) ate' Superintendent Designee Garden Grove Unified School District (714) 663-6442 9703.69' (Rev. 6/14) GEOTECHNICAL INTERNATIONAL LAN & ASSOCIATES Land Survey & Civil, Structural & Geotechnical Engineering 13139 Harbor Boulevard, Garden Grove, CA 92843 Tel: (714) 414-9215, Fax: (714) 537 – 7974, Email: Lanpham9@hotmail.com Project No. SA-12-04-25 April 2, 2025 Trang Ho (714) 213-1608 Onetrang10@gmail.com SUBJECT: Soil Report for Proposed New Detached ADU, 1126 Elaine Drive, Santa Ana, CA 92703. Dear Ms. Ho: In accordance with the requirements of the City and per your request and authorization, this soil report has been prepared for the proposed project. It is noted that Geotechnical International was the project geotechnical consultant of many similar projects in the City of Santa Ana. Therefore, we are familiar with the geotechnical conditions of the site. Follow is a summary of our findings and conclusions and recommendations for this project. Site Description and Proposed Development The subject property is located on the westerly side of Elaine Drive, south of Georgine Street (south of Westminster Avenue), north of Hazard Avenue, east of West Street (east of N. Newhope Street), and west of N. Harbor Blvd., within a developed residential area. A one-story house with an attached garage exists at the site. Based on the Site Plan prepared by the designer, we understand that the proposed new detached ADU will be constructed in the rear yard area. Note to the geotechnical report reviewer: Please see the actual full-scale plans prepared by the architect/designer/civil engineer which are separately submitted to the City for review, for clarification/details of the proposed development, as needed. The site is relatively flat; and we understand that additional raw cut/raw fill is not proposed for the site. Page 2 Geotechnical Conditions Based on the published geologic map prepared by the California Division of Mines and Geology (CDMG), the site is located within a broad flat alluvium and colluvium area. Based on the State of California SEISMIC HAZARD ZONES Map, Anaheim Quadrangle, the subject site is located within a potential liquefaction zone. For conservative purposes, we assume that the site will be subjected to the liquefaction. Therefore, a conventional liquefaction study with a 50 ft. deep test hole, and substantial sampling and laboratory testing and engineering analysis for verification whether the subject site is subject to liquefaction or is not considered necessary for this project. To mitigate the potential adverse effects due to potential liquefaction, as for all other near-by projects, a strengthened/stiffened foundation system [in accordance with the Special Publication 117A (SP117A), “Guidelines for Evaluating And Mitigating Seismic Hazards in California” dated 2008, published by California Geotechnical Survey (CGS), page 60] will be recommended to be used for the proposed new structure. The subject site is a previously graded lot where a house exists. The underlying soils were previously properly treated, as necessary, and previously evaluated to be suitable for structural support prior to approval for construction of the existing house. Distress to the existing house due to settlement and/or any other geotechnical issues was not observed / reported. Therefore, drilling a deep test hole, sampling, and performing consolidation testing for evaluation of the potential deep-seated settlement of the underlying soils is not considered necessary for this project. To verify the near ground surface soils, a 5 ft. deep test hole has been drilled using a hand-held drilling tool and soil samples were collected for laboratory testing. The approximate location of the test hole is depicted on the Site Plan / Geotechnical Map. The geotechnical boring log and summary of results of the laboratory testing are included in Appendix B. Based on the data of our test hole, the near ground surface earth materials generally consisted of silty fine sand, moist, medium dense and have a very low expansion potential. It is noted that, for conservative purposes, current minimum code values such as an allowable bearing earth pressure of 1,500 psf. and type 5 cement and 4,500 psi concrete strength, etc. as well as remedial removal of minimum 3 ft deep are recommended for this project. Deeper & wider footings with heavy reinforcement are also recommended to be used for this project, Therefore, laboratory testing such as direct shear, grain-size distribution, consolidation, sulfate content, etc. are not considered necessary and not performed for this residential development project. Page 3 Groundwater Free standing groundwater was not encountered in our test hole. Note: based on the Historically Highest Ground Water Contours and Boring Log Data Locations, Anaheim 7.5-Quadrangle, Plate1.2, Open-file Report 97-08, CDMG, the highest groundwater level at the subject property is about 5-6 ft. deep. Free standing ground water was not reported to be an issue at the site and in the vicinity. Deep footings/excavations are not proposed for the site; therefore adverse effects due to groundwater are not anticipated for the proposed development. Note: it is not anticipated; however, if wet soils are encountered, removal of the wet soils and replacement with drier soils/cement slurry can be performed. In addition, if needed, crushed rock and or geogrids for bridging, etc. can also be used. This will be determined by the geotechnical consultant based on the exposed conditions during the excavations at the site. Seismicity The subject site is located in Southern California, which is a major earthquake-prone zone. Therefore, the owner(s) of this property should be aware of the seismic risks associated with being located in this zone. The Soil Site Class D Default can be used for the soils underlying the subject site. The Seismic Design Category D can be used for the site. The following seismic parameters obtained from the computer program https:// seismicmaps.org prepared by SEAOC [Structural Engineers Association Of California] in conjunction with California’s Office of Statewide Health Planning and Development [OSHPD] ) in accordance with ASCE7-16 can be used for the site. · Fa = 1.2 · Fv = null* · Mapped Spectral Accelerations Values: Ss = 1.331 (for the short period of 0.2 second) S1 = 0.473 (for the 1-second period) · Maximum Considered Earthquake Spectral Response Accelerations: SMs = FaSs = 1.597 (for the short period of 0.2 second) SM1 = FvS1 = null* (for the 1-second period) Page 4 · Design Spectral Response Accelerations: SDs = 2/3 SMs = 1.064 (for the short period of 0.2 second) SD1 = 2/3 SM1 = null* (for the 1-second period) · PGA = 0.567 * Please see ASCE 7-16, Section 11.4.8. Please see APPENDIX C for additional seismic parameters, as needed. Note: In general, the structural consultant of record for this project should review the seismic parameters provided in this report and the 2022 CBC to evaluate the seismic design. Final selection of design coefficients should be made by the structural consultant based on the local laws and ordinances, expected structure response, and the desired level of conservatism. The civil/structural design engineer should consult with the project geotechnical consultant, if additional geotechnical information is needed for structural seismic design. Faults No active faults are known to exist within or near the site. The probability of primary surface rupture or deformation at the site is, therefore, considered very low. The site is not designated to be located within the Special Studies/Earthquake Zone under the Alquist-Priolo Special Studies Act. Liquefaction Potential As previously mentioned, for conservative purposes, the subject site is assumed to be subject to the liquefaction. Therefore, the owner(s) of this property should be aware of the risks associated with the potential liquefaction such as structural distress due to the potential differential settlement caused by the potential liquefaction. As previously mentioned, for conservative purposes, a strengthened / stiffened foundation system (having thicker slabs with more reinforcements and deeper and wider footings with more reinforcement as recommended in this report) should be used for support of the proposed structure. Potential Consequences of Liquefaction or Secondary Liquefaction Included Hazards Potential consequences of liquefaction or secondary liquefaction included hazards generally consist of differential settlement (vertical deformations), lateral Page 5 movement/lateral spreading (horizontal deformations), oscillation, and reduction in foundation soil-bearing capacity (bearing failure). A sloping condition or drainage or stream channel does not exist at the site; therefore, lateral movement/lateral spreading, oscillation, etc. due to potential liquefaction are not anticipated to be credible hazards for the proposed new structure. We believe if the area would be “liquefied” in the future due to a very strong earthquake, the potential damage to the proposed new structures which will be properly structurally designed in accordance with the new up-to-date codes would be much less severe than the existing on-site structures and surrounding existing houses which have been previously structurally designed based on old codes (which are much less stringent than the current new codes). However, the owner(s) of this property should be aware of the potential damage to the new structures due to liquefaction. In summary, it should be recognized that structural mitigation may not reduce the potential of the soils to liquefy during an earthquake; and there will remain some risk that the new structures could still suffer damage if liquefaction occurs, during a very strong earthquake. For conservative purposes, a strengthened / stiffened foundation system as recommended in this report should be used for support of the proposed structure. Slope Stability The site is a flat area; therefore, slope instability is not a concern for the proposed development. CONCLUSIONS AND RECOMMENDATIONS General Conclusions Construction of the proposed structure at the subject site is considered geotechnically feasible, provided the recommendations outlined in this report are implemented. Note: The conclusions and recommendations of this report are based on information as interpreted from our limited subsurface investigation. It is not anticipated but they should be revised accordingly if geotechnical conditions to be exposed during site preparation/ grading and construction significantly differ from our findings and interpretations. In general, a conventional shallow foundation can be used for support of the proposed structure. The following recommendations are considered minimum and may be superseded by more restrictive requirements of the architect, civil/structural engineer, building codes, or governing agencies. Page 6 Geotechnical Impact on Neighboring Properties Adverse geotechnical impact of the proposed development on the neighboring properties is not anticipated, provided the recommendations outlined in this report are properly implemented. Site Preparation/Grading To create a relatively uniform new engineered compacted fill layer for a proposed new structural slab-on-grade area, over-excavation and recompaction of about 3 ft. deep (measured from the existing ground surface) of the existing on-site soils should be performed. The lateral limits of the over-excavation should be minimum equal to depth of removal (3 ft. in this case) beyond the outside perimeter of the proposed new structure. For the proposed new exterior concrete slabs including new driveway, if any, the overexcavation and recompaction should be minimum 1 ft deep and 1 ft. outside of the new slab areas. Deeper remedial removal is not anticipated; however, this will be determined in the field by the project geotechnical engineer, based on the actual conditions to be exposed at the time of the site grading/preparation. The fill/backfill materials, if any, should be free of organic matter and oversized materials, 4 inches or greater in diameter, placed in near-horizontal loose lifts not to exceed eight inches in thickness, and moisture conditioned to slightly over optimum moisture content prior to compaction. Imported soils, if any, should have a very low expansion potential and should be geotechnically observed/tested and accepted by the geotechnical consultant prior to using at the site. In general, grading at the site, if any, should be performed in accordance with the requirements of the City and under the geotechnical observation and testing of the project geotechnical consultant. The compaction criterion for fill and backfill materials is a minimum of 90% of the maximum density determined in accordance with ASTM Test Method D1557. Page 7 Temporary Excavations In general, temporary excavations should be performed in accordance with OSHA requirements. In general, care should be taken during excavation near an existing structural object, if any to ensure no damage is done to the existing object. For this project, the proposed new structure will be located far away from the existing building. Therefore, temporary excavation for this project does not impact the existing footings. BUILDING FOUNDATION DESIGN GUIDELINES Geotechnical Parameters For Structural Design For conservative purposes, the following “lowest” code values should be used for structural design, as needed. a. Allowable vertical bearing earth pressure: 1,500 psf. An increase of one-third is permitted when using the alternative load combinations that include wind or earthquake loads. b. Lateral bearing passive earth pressure: 100 psf. per foot into competent materials below the finished ground surface. An increase of one third is permitted when using the alternative load combinations that include wind or earthquake loads. c. Lateral Sliding Resistance: cohesion = 130 psf. The cohesion value is to be multiplied by the contact area. In no case shall the lateral sliding resistance exceed one-half the dead load. d. Soil unit weight: 120 pcf. New Building Footings In general, the foundation system for the proposed structure must be properly designed by the civil/structural design engineer of record for this project and reviewed and approved by the city prior to construction. New building footings should be embedded minimum 24-inches below the adjacent lowest finished grade. Minimum widths for isolated columns/pad footings, if any, should be 24-inches, and for continuous wall footings should be 15-inches for one-story and 18- inches for two story portions, if any. Page 8 Minimum reinforcement for new continuous footings should be two #5 re-bars at top and two #5 re-bars at bottom. Settlement As previously mentioned, the subject site is a previously graded lot where a house exists. The underlying soils were previously properly treated, as necessary, and previously evaluated to be suitable for structural support prior to approval for construction of the existing house. Distress to the existing house due to settlement (and/or any other geotechnical issues) was not observed / reported. Therefore, deep-seated settlement of the soils underlying the site is not considered to be a concern for the proposed new structures. In general, based on our experience, the conventional total settlement of ½ inch and a differential settlement of ¼ inch over a horizontal distance of 30 feet are anticipated for the proposed new structure and would occur during the construction stage. New (Interior) Building Slabs-on-Grade New (interior) building slabs-on-grade should be minimum 5 inches thick, reinforced with #4 re-bars at 12 inches on centers, or equivalent, placed at mid-height of the slab. New slabs should be underlain by a 2-inch thick layer of clean sand. For moisture sensitive floor areas, the new slabs should be underlain by a 10-mil polyethylene moisture barrier membrane (such as Visqueen). The moisture barrier membrane should be properly lapped and sealed at joints and around any breaks such as openings for utility conduits. Note: CAL Green Code, and/or other applicable codes/City’s requirements should govern and be followed. The entire slab-on-grade system including the capillary break / vapor/moisture retarder should be properly designed by the project civil /structural design engineer of record (but not by the geotechnical engineer) and reviewed and approved by the City prior to construction. New Exterior Slabs-on-Grade To reduce the potential for excessive cracking, new exterior concrete slabs-on-grade, if any, should be minimum 4 inches thick, provided with construction or weakened plane joints at frequent intervals (e. g., every 6 feet or less). Provision of a 2-inch thick layer of crushed rock, gravel, or clean sand to be placed beneath the slabs and/or reinforcement, such as #3 re-bars at 24 inches on-centers, or equivalent, placed at the mid-height of the slab should be considered. The subgrade soils for the exterior slabs should be properly re- compacted. Page 9 Slab Subgrade Pre-Saturation The conventional pre-saturation of subgrade soils to minimum 140% of the optimum moisture content to minimum 24 inches deep is not considered necessary for this project. However, spraying with water should be performed prior to concrete pour. Other Recommendations for Reducing Slab Cracking While not a geotechnical issue, the potential for slab cracking may also be reduced by careful control of water/cement ratio and slump of concrete. The contractor should take appropriate curing precautions during the pouring of concrete in hot weather to reduce cracking of slabs. A slip sheet (or equivalent) can be utilized if grouted tile, marble tile, or other crack- sensitive floor covering is planned directly on concrete slabs. New Driveway The minimum section required by the City can be used for a new driveway, if any. If there is no minimum requirements by the City, a 5-inch thick concrete slab (PCC), reinforced with #4 rebar (placed at mid-height of slabs) at 18 inches on-centers both ways, or 5-in. thick asphalt concrete (AC), or equivalent, over a 6-inch thick layer of aggregate base (AB) can be used. The aggregate base and subgrade should be properly compacted to a minimum of 95% and 90%, respectively, of the maximum density determined in accordance with ASTM D1557 prior to placement of the concrete slab. Spraying the compacted subgrade soils with water should be performed prior to concrete pour. If pavers are to be used, they must be properly designed by the civil engineer of record for this project and approved by the city prior to construction. Additional geotechnical data can be provided for design, if requested. Site Drainage In general, proper surface drainage should be checked, improved as needed, and maintained to ensure surface water flows away from all structures. Requirements by the city and applicable CBC (2022 CBC) should also be followed. Roof gutters should be properly provided. Roof drains, gutters and downspouts should be maintained to function as intended. Outlet drains should be kept open. Irrigation at the site, if any, should be kept to a minimum required to support plant life. In the future, sources of uncontrolled water, such as leaky sewer, water (domestic, irrigation) or drainpipe, should be repaired if identified. Page 10 Seismic Design We recommend the proposed new structure be structurally designed to meet the applicable building codes and requirements of the controlling governmental agencies. The seismic parameters provided in the “Seismicity” section of this report can be used. The civil/structural design engineer should consult with the project geotechnical consultant, if additional geotechnical information is needed for the seismic design. Cement Type For Concrete in Contact with On-Site Earth Materials Our previous tests performed on the soils of many lots in the City of Santa Ana which are similar to the on-site soils show negligible water-soluble sulfate contents. Sulfate attack on concrete was not observed for the existing on-site house and other houses in the surrounding areas. It appears sulfate attack on concrete is not considered to be a problem for this project. However, for conservative purpose, Type V cement with a maximum water/cement ratio of 0.45 and a minimum concrete strength, f'c of 4,500 psi is recommended to be used for concrete in contact with the on-site soils. Additional water- soluble sulfate content testing can be performed for the soils at the site, as needed. The test can be conducted during and/or after completion of site preparation/grading. The applicable California Building Code (2022 CBC) and other requirements by controlling governmental agencies should be followed. Corrosion To Ferrous Metals and Copper For conservative purposes, the on-site soils can be considered severely corrosive to ferrous metals and copper. Underground/buried ferrous metals or copper are not planned to be used for this project. However, if underground/buried ferrous metals or copper are planned to be used at the site, they should be properly protected. A corrosion specialist can be consulted. Testing can be performed for verification of the potential corrosion of the soils at the site to ferrous metals and copper, if needed. The test can be performed during and/or after completion of grading. Geotechnical Review of Grading and Foundation Plans Based on the City’s requirements, the project geotechnical consultant should review, “approve” and sign the project grading and foundation plans with details/specifications, if any, indicating conformation to applicable geotechnical recommendations. We will corporate with the civil/structural design engineers who prepare the plans to ensure our geotechnical recommendations are properly incorporated into the plans. Geotechnical Observation and Testing During Construction We recommend that a qualified geotechnical consultant be retained to provide geotechnical engineering services, including geotechnical observation/testing, during the Page 11 construction phase of the project. This is to verify the compliance with the design, specifications and/or recommendations, and to allow design changes in the event that subsurface conditions differ from those anticipated. Geotechnical observation/testing can be performed at the following stages:  During ANY grading operations, including excavation, removal, filling and backfilling, etc.  During and after excavation for footings to verify the adequacy of underlying materials.  After pre-saturation of slab subgrade earth materials, if any, prior to pouring concrete.  After compaction of subgrade soils and/or aggregate base for exterior slabs and or driveway, if any.  During backfill of drainage and utility line trenches, if any, to verify proper compaction.  When/If any unusual geotechnical conditions are encountered. Note: If Geotechnical International is not provided the opportunity to perform the geotechnical observation/testing during the construction phase, Geotechnical International will take no responsibility for the conclusions and recommendations contained in our report in the event that subsurface conditions differ from those interpreted and anticipated during our preliminary investigation phase prior to the start of construction. Page 12 CLOSURE The conclusion and recommendations contained in this report are presented based on geotechnical data as described herein which are believed representative of the total project area. However, earth materials can vary in characteristics, both laterally and vertically, and those variations could affect the conclusions and recommendations contained herein. As such, observation and testing by a qualified geotechnical consultant during the construction phase of the project are essential to confirming the basis of this report. This report has been prepared consistent with that level of care being provided by other professionals providing similar services at the locale and time period. The contents of this report are professional opinions and as such, are not to be considered a guaranty or warranty. This report should be reviewed and updated after a period of one year or if the lot ownership or site conditions / proposed development change from that described herein. The following are attached and complete our report: Appendix A – References Appendix B – Geotechnical Log of Test Hole and Laboratory Test Results Appendix C – Seismic Data Figure 1 – Vicinity Map Figure 2 – Site Plan/Geotechnical Map If you have any questions or require clarification, please contact this office. This opportunity to be of service is sincerely appreciated. Very truly yours, Lan N. Pham, P.E. Chief Geotechnical Engineer RGE686, Exp. 3/31/27 Page 13 APPENDIX A REFERENCES Page 14 REFERENCES 1. California Division of Mines and Geology (CDMG), the Resources Agency, Dept. of Conservation, 1981, “Geology Map of Orange County Showing Mines and Mineral Deposits”, scale 1:48,000, 1” = 4000’, or 1” = 0.76 miles, prepared in corporation with County of Orange EMA, compiled by P.K. Morton and R.V. Miller, dated 1981. 2. California Division of Mines and Geology (CDMG), Department of Conservation, 1998, “Seismic Hazard Zones, Anaheim Quadrangle”, Scale 1:24,000 (1” = 2,000 ft or 1” = 0.38 miles), Released April 15, 1998. 3. California Division of Mines and Geology, 1997, “Seismic Hazard Zone Report for The Anaheim and Newport Beach 7.5-minute Quadrangle, Orange County, California,” Seismic Hazard Zone Report 03,” revised 2006. Page 15 APPENDIX B GEOTECHNICAL LOG OF TEST HOLE AND LABORATORY TEST RESULTS Page 16 GEOTECHNICAL LOG OF TEST HOLE Date: March 20, 2025 TEST HOLE No. 1 Project No. Job No.: SA- Hole Diameter: 4 + inches Equipment: Hand-Auger DEPTH DESCRIPTION 0’ - 2+ (Grass). Medium brown silty fine sand, moist, medium dense. 2’- 3.5’+ Medium grey silty fine sand, moist, medium dense. 3.5’- end Light grey silty fine sand, moist to very moist, medium dense. Total Depth: 5 ft. + No Caving No Free-Standing Groundwater Hole backfilled with onsite soils Page 17 EXPANSION INDEX TEST RESULTS Sample Compacted Moisture Content Expansion Expansion Location Dry Compacted Final Index Potential Density (pcf) (%) (%) Classification TH-1 @ 0’ – 3’ Sandy: non-expansion Test Method: ASTM D4829 Page 18 ATTERBERG LIMITS TEST RESULTS Sample Location Liquid Limit Plastic Limit Plasticity Index TH-1 @ 0’ - 3’ Sandy: could not perform the tests. Test Method: ASTM D4318 Page 19 APPENDIX C SEISMIC DATA USGS web services were down for some period of time and as a result this tool wasn't operational, resulting in timeout error. USGS web services are now operational so this tool should work as expected. 1126 Elaine Dr, Santa Ana, CA 92703, USA Latitude, Longitude: 33.7552116, -117.9230635 Date 3/28/2025, 3:48:28 PM Design Code Reference Document ASCE7-16 Risk Category II Site Class D - Default (See Section 11.4.3) Type Value Description SS 1.331 MCER ground motion. (for 0.2 second period) S1 0.473 MCER ground motion. (for 1.0s period) SMS 1.597 Site-modified spectral acceleration value SM1 null -See Section 11.4.8 Site-modified spectral acceleration value SDS 1.064 Numeric seismic design value at 0.2 second SA SD1 null -See Section 11.4.8 Numeric seismic design value at 1.0 second SA Type Value Description SDC null -See Section 11.4.8 Seismic design category Fa 1.2 Site amplification factor at 0.2 second Fv null -See Section 11.4.8 Site amplification factor at 1.0 second PGA 0.567 MCEG peak ground acceleration FPGA 1.2 Site amplification factor at PGA PGAM 0.68 Site modified peak ground acceleration TL 8 Long-period transition period in seconds SsRT 1.331 Probabilistic risk-targeted ground motion. (0.2 second) SsUH 1.442 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration SsD 1.901 Factored deterministic acceleration value. (0.2 second) S1RT 0.473 Probabilistic risk-targeted ground motion. (1.0 second) S1UH 0.514 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration. S1D 0.655 Factored deterministic acceleration value. (1.0 second) PGAd 0.78 Factored deterministic acceleration value. (Peak Ground Acceleration) PGAUH 0.567 Uniform-hazard (2% probability of exceedance in 50 years) Peak Ground Acceleration CRS 0.922 Mapped value of the risk coefficient at short periods CR1 0.922 Mapped value of the risk coefficient at a period of 1 s CV 1.366 Vertical coefficient 3/28/25, 3:48 PM U.S. Seismic Design Maps https://www.seismicmaps.org 1/2 DISCLAIMER While the information presented on this website is believed to be correct, SEAOC /OSHPD and its sponsors and contributors assume no responsibility or liability for its accuracy. The material presented in this web application should not be used or relied upon for any specific application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. SEAOC / OSHPD do not intend that the use of this information replace the sound judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the results of the seismic data provided by this website. Users of the information from this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible for building code approval and interpretation for the building site described by latitude/longitude location in the search results of this website. 3/28/25, 3:48 PM U.S. Seismic Design Maps https://www.seismicmaps.org 2/2 VICINITY MAP FIGURE 1 1126 ELAINE DRIVE SANTA ANA, CA 92703 SITE SITE PLAN/GEOTECHNICAL MAP FIGURE 2 REDUCED SCALE Approximate Location of Test Hole TH-1 TH E E N T I R E S I T E I S U N D E R L A I N B Y A L L U V I U M A N D C O L L U V I U M 1126 ELAINE DRIVE SANTA ANA, CA 92703