Loading...
HomeMy WebLinkAbout907 N Dianne St & Unit #2 - PlanDI A N N E S T 20'-6"44'-2"17'-0" 57 ' - 2 " 5' - 4 " 5' - 0 " 24'-5"28'-2"36'-6" 12 ' - 0 " 20 ' - 1 1 " 29 ' - 3 " 7'-5" 7' - 0 " 5' - 0 " 5' - 4 " 3' - 2 " LEGEND PATH OF TRAVEL TO ADU SI T E P L A N A-100 1/8" = 1'-0" AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.15 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D RE S T R I CT I O N S: THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPIED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO COM P L Y W I L L R E S U L T IN I MM E D I A TE LEGAL ACTION TO COMPENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 SHEET INDEX DESIGN - PRIMARY CONTACT VALLECIOS - DESIGN | PROJECT MANAGEMENT 818.554.8831 VALLECIOS@GMAIL.COM OWNER MICHAEL AND VAN SUATENGCO 661.733.5220 SWANCLAN1744@GMAIL.COM PROJECT CONTACTS SCOPE OF WORK SITE INFORMATION THIS PROJECT IS TO BE IN COMPLIANCE WITH: 2022 CALIFORNIA RESIDENTIAL BUILDING CODE 2022 CALIFORNIA GREEN CODE 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA ENERGY CODE CITY OF SANTA ANA MUNICIPAL CODE COMPLIANCE VICINITY MAP APN: 400-164-08 SANTA ANA, CA 92071 ADU 907 DIANNE ST Unit #2 SFD 907 DIANNE ST NEW 351 SQ.FT. ATTACHED ACCESSORY DWELLING UNIT (ADU) AT REAR OF EXISTING SINGLE FAMILY DWELLING. - DEMOLITION OF EXISTING 245 SQ.FT. SUNROOM, INFILL DOOR OPENING CONNECTING MAIN RESIDENCE TO SUNROOM A-100 SITE PLAN A-200 EXISTING FLOOR PLAN & DEMO PLAN A-201 PROPOSED FLOOR PLAN A-210 ELEVATIONS A-230 ROOF PLAN A-240 ELECTRICAL LAYOUT PLAN PROPERTY PROFILE CONSTRUCTION TYPE:V-B BUILDING HEIGHT:±10'-9" FIRE SPRINKLERS:NO OCCUPANCY:R-3, U (E) SFD SIZE:1,313 ADU SIZE:351 ADU TO SFD RATIO:26.73% ASSESSMENT NO.400-164-08 LOT NUMBER 20 LEGAL START DATE 10/16/1956 LOT TYPE LOT DOC. NO.MM 109/1-2 MAP NO.TR 2109 DOC. REF. NO.200800496277 DOC. REF. DATE LEGAL DESCR.N-TRACT:2109 BLOCK: LOT: 20 SITE ADRESS 907 DIANNE ST LANDUSE 163 AREA SQFT 6000 PERIM. FT 313 CITY/STATE SANTA ANA ZIPCODE 92701 JOBSITE N SITE PLAN PROJECT NOTES: BLD/SFTY CORR. 10.3.2024 W.V. D.V.1 S-001 GENERAL NOTES S-002 GENERAL NOTES S-003 TYPICAL DETAILS S-004 TYPICAL DETAILS S-100 FOUNDATION AND FRAMING PLANS S-200 DETAILS G-100 T-24 (1 OF 2) G-200 T-24 (2 OF 2) G-300 GREEN BUILDING FORMS G-400 GREEN BUILDING FORMS STRUCTURAL ENGINEER NICK SIVUSHENKA | SAA STRUCTURAL 323.448.4682 NICK@SAAENG.COM ·INDOOR AIR QUALITY VENTILATION ·KITCHEN RANGE HOOD ·VERIFIED REFRIGERANT CHARGE ·VERIFIED HEAT PUMP RATED HEATING CAPACITY HERS FEATURE SUMMARY SOILS REPORT EXEMPTION SOILS REPORT MAY BE EXEMPTED FOR PROJECTS THAT MEET CITY'S SOIL REPORT EXEMPTION HANDOUT (FORM PCC-06): One-story and two-story attached additions to an existing single-family dwelling. MINIMUM FOUNDATION CONSTRUCTION REQUIREMENTS 1)Depth of foundations below the natural grade shall not be less than 18 inches. 2)Continuous foundations shall be reinforced with at least four continuous #4 reinforcing bars, two #4 bars at the top and two #4 bars at the bottom. 3)Slab construction shall be minimum 4” thick, reinforced with #4 bars at 18” on center each way. 4)Doweling of the new foundations and slabs into the existing foundations and slabs shall be required. Dowels shall be a minimum of 6” into the existing concrete and shall extend a minimum of 24” into the new concrete. Dowels shall be minimum #3 bars at 18” on center or #4 bars at 24” on center NOTE: The structural plans meet these (4) conditions. See Foundation Plan on Sheet S-1.0 THE ADU SF / SFD SF RATIO IS FOR PARK & REC FEE PURPOSE ONLY. THE APPLICANT IS RESPONSIBLE FOR THE GIVEN “SFR SF” OF THE EXISTING PRIMARY RESIDENCE; BUILDING SAFETY STAFF ARE NOT RESPONSIBLE FOR THE ACCURACY OF THE GIVEN “SFR SF” OF THE EXISTING RESIDENCE. BLD/SFTY CORR. 6.5.2025 W.V. D.V.2 FEMA 907 DIANNE ST, SANTA ANA, CA [APN 400-164-08] IS NOT IN A FEMA DESIGNATED ZONE Bldg #'s 101121715-16 APPROVALS: PLNG - V. Estrada BLDG - CSG POLICE - B. Martin PUBLIC WORKS - B. Sarlak FLOOR PLAN EXISTING N GRAPHIC SCALE SD SD SD SDCM CM 20 ' - 1 1 " 12'-0" 11'-7" 20 ' - 1 " LEGEND DEMOLISH EXISTING WALL DEMOLITION NOTES DEMOLITION PLAN N GRAPHIC SCALE E X I S T I N G F L O O R P L A N & D E M O L I T I O N P L A N A-200 N.T.S. AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.15 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D RE S T R I CT I O N S: THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPIED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO COM P L Y W I L L R E S U L T IN I MM E D I A TE LEGAL ACTION TO COMPENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 W DOOR SCHEDULE D D D WINDOW SCHEDULE W 24" MIN. 30 " MI N . ABBREVIATIONS LEGEND EXHAUST FAN DEMOLISH NEW WALL EXISTING WALL SD CM SMOKE DETECTOR CARBON MONOXIDE FLOOR PLAN PROPOSED N GRAPHIC SCALE DOOR NUMBER WINDOW NUMBER W D NOTE NUMBER “” “” SMOKE ALARM REQUIREMENTS CARBON MONOXIDE ALARM REQUIREMENTS MINI-SPLIT AIR HANDLER FONTANA POLICE DEPARTMENT SECURITY SPECIFICATIONS 20" Minimum clear 24 " Mi n i m u m C l e a r 20" Minimum clear 44 " M a x i m u m S i l l He i g h t a b o v e Fi n i s h e d F l o o r 20 ' - 1 1 " 5' - 0 " 14 ' - 8 " 17'-0" 10'-4"4'-0" 16'-7" 2' - 0 " 3' - 0 " W D D D W W SD SD SD SD SDCM CM 3" 1'-5" W FLOOR PLAN NOTES · ·” ”” · 1-HOUR INTERIOR WALL WOOD FRAMED 2 CM 1 P R O P O S E D F L O O R P L A N A-201 N.T.S. AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.15 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D RE S T R I CT I O N S: THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPIED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO COM P L Y W I L L R E S U L T IN I MM E D I A TE LEGAL ACTION TO COMPENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 BLD/SFTY CORR. 10.3.2024 W.V. D.V.1 8' - 0 " 44'-2" EXISTING 17'-0" PROPOSED 10 ' - 9 " 11 ' - 1 " NORTH ELEVATION PROPOSED 20'-11" PROPOSED 29'-3" EXISTING 7'-0" EXISTING 8' - 0 " 11 ' - 1 " 8' - 0 " 10 ' - 9 " EAST ELEVATION PROPOSED 44'-2" EXISTING 17'-0" PROPOSED 10 ' - 9 " 8' - 0 " 11 ' - 1 " SOUTH ELEVATION PROPOSED 57'-2" EXISTING 8' - 0 " 11 ' - 1 " WEST ELEVATION EXISTING ELEVATION NOTES EL E V A T I O N S A-210 N.T.S. AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.15 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D RE S T R I CT I O N S: THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPIED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO COM P L Y W I L L R E S U L T IN I MM E D I A TE LEGAL ACTION TO COMPENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 BLD/SFTY CORR. 10.3.2024 W.V. D.V.1 FLASHING AT EXTERIOR OPENING FLASHING AT ROOF RIDGE 8" 4" FLASHING AT ROOF VALLEY 8" 4" 8" 4" 12" 9" ROOF PLAN N GRAPHIC SCALE ROOF NOTES CONSTRUCTION NOTES SECTION NOTES PROPOSED SECTION-AA 6' - 8 " 8' - 0 " 10 ' - 9 " RO O F P L A N A-230 N.T.S. AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.15 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D RE S T R I CT I O N S: THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPIED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO COM P L Y W I L L R E S U L T IN I MM E D I A TE LEGAL ACTION TO COMPENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 BLD/SFTY CORR. 10.3.2024 W.V. D.V.1 ELECTRICAL LAYOUT PLAN 1 ” ’ ELECTRICAL NOTES N LEGEND SD CM SD SD SD SD SDCM CM CM EL E C T R I C A L L A Y O U T P L A N A-240 N.T.S. AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.15 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D RE S T R I CT I O N S: THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPIED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO COM P L Y W I L L R E S U L T IN I MM E D I A TE LEGAL ACTION TO COMPENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 PAGE # NOTES AS NOTEDSCALE: DATE: PHONE: 323-448-4682 GE N E R A L N O T E S AT T A C H E D A D U 90 7 D I A N N E S T , SA N T A A N A , C A 9 2 7 0 1 04/28/2025 A.THE FOLLOWING ABBREVIATIONS OR ACRONYMS MAY BE USED IN THESE DRAWINGS: PROJECT =ATTACHED ADU PROPERTY =907 DIANNE ST, SANTA ANA, CA 92701 ARCHITECT =VALLECIOS DESIGN STUDIO SAA =SAA STRUCTURAL ENGINEERING PRIMARY CONTACT: NICK SIVUSHENKA, P.E. GEOTECHNICAL =N/A ENGINEER BUILDING =THE CITY OF SANTA ANA DEPARTAMENT DEPARTMENT OF BUILDING AND SAFETY IBC =THE INTERNATIONAL BUILDING CODE, 2021 EDITION; SECONDARY BUILDING CODE FOR PROJECT. CBC =THE CALIFORNIA BUILDING CODE, 2022 EDITION (CONSISTING OF THE 2021 IBC AS ADOPTED BY THE STATE OF CALIFORNIA); SECONDARY BUILDING CODE FOR PROJECT ICC =THE INTERNATIONAL CODE CONFERENCE; AUTHOR OF IBC, SOURCE AUTHORITY FOR GENERAL CODE REQUIREMENTS. ACI =THE AMERICAN CONCRETE INSTITUTE; SOURCE AUTHORITY FOR STRUCTURAL CONCRE WORK. AISC =THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION; SOURCE AUTHORITY FOR STRUCTURAL STEEL WORK. AISI =THE AMERICAN IRON AND STEEL INSTITUTE; SOURCE AUTHORITY FOR LIGHT GAGE STEEL FRAMING. AWS =THE AMERICAN WELDING SOCIETY; SOURCE AUTHORITY FOR WELDING. ASTM =THE AMERICAN SOCIETY FOR TESTING OF MATERIALS; SOURCE AUTHORITY FOR MATERIAL QUALITY AND TESTING STANDARDS. CRSI =THE CONCRETE REINFORCING STEEL INSTITUTE; SOURCE AUTHORITY FOR REINFORCING STEEL FABRICATION AND INSTALLATION STANDARDS. ABV =ABOVE A.B.=ANCHOR BOLTS(S) APX =APPROXIMATE OR APPROXIMATELY ARCH =ARCHITECTURAL BTWN =BETWEEN BLW =BELOW BOT =BOTTOM COL =COLUMN CONT =CONTINUOUS (E)=EXISTING (CONTRACTOR TO FIELD VERIFY) EA =EACH EL =ELEVATION EMBD =EMBEDMENT EQ =EQUAL FIN =FINISH (SEE ARCHITECTURAL DETAILS) FOF =FACE OF FINISH FP =FULL PENETRATION (WELD) F.S.=FAR SIDE GA =GAGE (SHEET METAL OR WIRE AS APPLICABLE) HORZ =HORIZONTAL LLH =LONG LEG HORIZONTAL (ORIENTATION OF UNEQUAL LEG ANGLE) LLV =LONG LEG VERTICAL (ORIENTATION OF UNEQUAL LEG ANGLE) LSH =LONG SIDE HORIZONTAL (ORIENTATION OF RECTANGULAR TUBE) LSV =LONG SIDE VERTICAL (ORIENTATION OF RECTANGULAR TUBE) MAX =MAXIMUM M.B.=MACHINE BOLTS OR BOLTS (INDICATED ASTM A307 FASTENERS) MIN =MINIMUM (N)=NEW NIC =NOT IN CONTRACT (WORK EXCLUDED FROM SCOPE) NOM =NOMINAL NTS =NOT TO SCALE O.C.=ON CENTER OP =OPPOSITE PC =PIECE PP =PARTIAL PENETRATION (WELD) PSF =POUNDS PER SQUARE FOOT RQD =REQUIRED SIM =SIMILIAR SMS =SHEET METAL SCREW (SELD TAPPING UNO) SYM =SYMMETRICAL OR STMMETRY STD =STANDARD TOC =TOP OF CONCRETE TOF =TOP OF FINISH TOS =TOP OF STEEL (NOT TOP OF SLAB) TYP =TYPICAL UNO =UNLESS NOTED OTHERWISE VERT =VERTICAL B. 1. 2. 3. 4. a. b. 5. a. b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s =1.295 S1 =0.462 SDS =1.036 SD1 =0.566 EQUIVALENT LATERAL FORCE PROCEDURE: LIGHT-FRAME (WOOD) SHEAR WALLS : R = 6.5; Cs = 0.207; REDUNDANCY FACTOR = 1.3 FOUNDATIONS: FOUNDATIONS HAVE BEEN PROPORTIONED BASED ON THE FOLLOWING ALLOWABLE BEARING PRESSURES PER CBC: CONTINUOUS FOOTINGS 1500 PSF ALL TRADES PROJECT SCOPE THE PROPOSED PROJECT INVOLVES ATTACHED ADU STRUCTURAL OBSERVATION THE STRUCTURAL OBSERVER SHALL PERFORM SITE VISITS AT THOSE STEPS IN THE PROGRESS OF THE WORK THAT ALLOW FOR CORRECTION OF DEFICIENCIES WITHOUT SUBSTANTIAL EFFORT OR UNCOVERING OF THE WORK INVOLVED. THE STRUCTURAL OBSERVER SHALL PREPARE A REPORT OF THE STRUCTURAL OBSERVATION REPORT FORM FOR EACH SIGNIFICANT STAGE OF CONSTRUCTION OBSERVED. THE ORIGINAL OF THE STRUCTURAL OBSERVATION REPORT SHALL BE SENT TO THE BUILDING INSPECTOR'S OFFICE AND SHALL BE SIGNED AND SEALED (WET STAMP) BY THE RESPONSIBLE STRUCTURAL OBSERVER. ONE COPY OF THE OBSERVATION REPORT SHALL BE ATTACHED TO THE APPROVED PLANS. THE COPY ATTACHED TO THE PLANS SHALL BE SIGNED AND SEALED BY THE RESPONSIBLE STRUCTURAL OBSERVER OR THE DESIGNEE. COPIES OF THE REPORT SHALL ALSO BE GIVEN TO THE OWNER, CONTRACTOR, AND DEPUTY INSPECTOR. ANY DEFICIENCY NOTED ON THE OBSERVATION REPORT WILL BECOME THE RESPONSIBILITY OF THE STRUCTURAL ENGINEER OF RECORD TO VERIFY ITS COMPLETION BY HIM (HER), OR BY A REGISTERED DEPUTY INSPECTOR AT THE DISCRETION OF THE STRUCTURAL OBSERVER. A FINAL OBSERVATION REPORT AND THAT OF THE REGISTERED DEPUTY INSPECTOR MUST BE SUBMITTED WHICH SHOWS THAT ALL OBSERVED DEFICIENCIES WERE RESOLVED AND STRUCTURAL SYSTEM GENERALLY CONFORMS TO THE APPROVED PLANS AND SPECIFICATIONS. THE DEPARTMENT OF BUILDING AND SAFETY WILL NOT ACCEPT THE STRUCTURAL WORK WITHOUT THIS FINAL OBSERVATION REPORT AND THAT OF THE REGISTERED DEPUTY INSPECTOR (WHEN PROVIDED) AND THE CORRECTION OF SPECIFIC DEFICIENCIES NOTED DURING NORMAL BUILDING INSPECTION. SPECIAL INSPECTIONS THE OWNER SHALL RETAIN A DEPUTY INSPECTOR LICENSED BY THE CITY OF SANTA ANA DEPARTMENT OF BUILDING & SAFETY IN ACCORDANCE WITH CHAPTER 17 OF CBC. THE FOLLOWING AREAS OF WORK REQUIRE INSPECTIONS BY A DEPUTY INSPECTOR TO VERIFY COMPLIANCE WITH CBC: TRADE INSPECTION DUTIES INSPECTION DURATION REBAR PLACEMENT MATERIAL SPEC, REBAR SIZE AND CONFIGURATION INTERMITTENT INSTALLATION OF HOLDOWN ANCHOR BOLTS PRIOR TO CONCRETE PLACEMENT VERIFY MATERIAL, SIZE, LOCATION AND INSTALLATION FOR COMPLIANCE WITH DESIGN DRAWINGS PERIODIC ADHESIVE ANCHORS INSPECTION OF MATERIALS ND INSTALLATION IN ACCORDANCE WITH ICC APPROVAL CONTINUOUS ICC/LARR THE FOLLOWING ARE A LIST OF COMPONENTS USED WITHIN THE PROJECT WITH INTERNATIONAL CODE COUNCIL REPORT NUMBERS AND CITY OF LOS ANGELES RESEARCH REPORT NUMBERS FOR THE CONTRACTOR TO OBTAIN AND FOLLOW PROVISIONS OF. COMPONENT SIMPSON SDS WOOD SCREWS ICC-ESR / IAPMO # ICC-ESR # 2236 SIMPSON A35 ICC-ESR # 2606 SIMPSON STRAPS ICC-ESR # 2105 SIMPSON HOLDOWNS ICC-ESR # 2330 (323) 448-4682 Nick SIvushenka C-87698 Excavations, rebar placement, and anchor bolt templates prior to pouring concrete Shear wall framing, sheathing, nailing and hardware (including holdowns) Roof framing, sheathing, nailing, and hardware slab on grade P/BC 2014-024 SIMPSON SET-XP ICC-ESR # 2508 S-001 DIGITALLY STAMPED AND SIGNED 8.19.2024 EXP: 9.30.2025 PAGE # NOTES AS NOTEDSCALE: DATE: PHONE: 323-448-4682 GE N E R A L N O T E S AT T A C H E D A D U 90 7 D I A N N E S T , SA N T A A N A , C A 9 2 7 0 1 04/28/2025 A. 1. 2. B. 1. 2. 3. 4. a. b. c. 5. 6. 7. 8. 9. a. b. c. d. e. f. g. C. 1. a. b. c. 2. 3. 4. D. 1. 2. a. b. 3. 4. 5. 6. a. b. c. 7. a. b. c. d. 8. IN ADDITION TO CODE, THE FOLLOWING SPECIFICATIONS AND STANDARDS APPLY TO STRUCTURAL LUMBER AND RELATED CARPENTRY WORK FOR PROJECT: NFPA NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION. WCLIB GRADING RULES NO. 16 OR APPLICABLE WWPA GRADING RULES. MATERIAL QUALITY SHALL BE CONSISTENT WITH DESIGN ASSUMPTIONS. STRUCTURAL LUMBER SHALL BE DOUGLAS FIR-LARCH (UNO). DOC PS 20. MEMBER SIZES SPECIFIED ARE NOMINAL. STRUCTURAL LUMBER SHALL BE FINISHED S4S (UNO). STRUCTURAL LUMBER SHALL BE GRADE MARKED IN ACCORDANCE WITH REFERENCED GRADING STANDARDS (UNO). MINIMUM GRADES SHALL BE AS REQUIRED BY APPLICABLE STANDARDS BUT AT LEAST EQUAL TO THE FOLLOWING: 2X WALL STUDS ONLY -- CONSTRUCTION GRADE OTHER STUDS, JOISTS AND RAFTERS -- NO. 2 BEAMS, POSTS AND ALL OTHER STRUCTURAL LUMBER -- NO. 1 OR BETTER HIGHER LUMBER GRADES SHALL BE USED WHERE INDICATED. NAILS SHALL BE COMMON WIRE NAILS (UNO). BOLTS SHALLS BE M.B. WITH STANDARD MALLEABLE IRON OR STEEL PLATE WASHERS UNDER ALL BOLT HEADS AND NUTS BEARING ON WOOD (UNO). CONNECTION HARDWARE SHALL BE AS CALLED FOR. ALTERNATE PRODUCTS SHALL BE SUBSTITUTED ONLY WITH THE APPROVAL OF SAA AND BUILDING DEPARTMENT. MACHINE NAILING SYSTEMS SHALL BE SUBJECT TO SATISFACTORY DEMONSTRATION AND TO THE ACCEPTANCE OF SAA AND BUILDING DEPARTMENT. THE CONTRACTOR SHALL MAKE APPROPRIATE SUBMISSIONS, INCLUDING TECHNICAL DATA, IN SUPPORT OF ANY PROPOSED MACHINE NAILING SYSTEM ON REQUEST. HEADS OR TOPS OF NAILS OR OTHER MACHINE DRIVEN FASTENERS SHALL NOT PENETRATE THE SURFACE OF THE WOOD MORE THAN WOULD BE NORMAL FOR HAND DRIVING. LUMBER DAMAGED BY OVERDRIVING SHALL BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. PERSISTANT OVERDRIVING SHALL BE SUFFICIENT CAUSE FOR REJECTION OF A MACHINE NAILING SYSTEM. EDGE DISTANCES FOR MACHINE DRIVEN FASTENERS SHALL BE AS REQUIRED FOR HAND DRIVING AND BY APPLICABLE CODES AND STANDARDS AND SHALL BE CONSISTENT WITH THE NAILING SYSTEM MANUFACTURER'S RECOMMENDATIONS. ACCEPTANCE OF A MACHINE NAILING SYSTEM SHALL BE SUBJECT TO CONTINUED SATISFACTORY PERFORMANCE. MACHINE NAILING SHALL NOT BE USED WITH PLYWOOD LESS THAN 3/8" THICK. APPROPRIATE PRECAUTIONS SHALL BE TAKEN TO ASSURE DURABILITY: WOOD EXPOSED TO MOISTURE OR EARTH SHALL BE TREATED FOR PROTECTION AGAINST DECAY AND TERMITE ATTACK OR SHALL BE FOUNDATION GRADE REDWOOD. THIS REQUIREMENT SHALL APPLY TO: ANY WOOD EMBEDDED IN OR IN DIRECT CONTACT WITH CONCRETE OR MASONRY. ANY WOOD OTHER THAN WALL STUDS WITHIN ONE FOOT OF EARTH. ANY FLOOR JOIST WITHIN 18" OF EARTH. PRESSURE TREATMENT PROCESS SHALL BE APPROVED BY BUILDING DEPARTMENT AND SAA. TREATMENT PROCESSES EFFECTING MATERIAL PROPERTIES SHALL NOT BE USED ON STRUCTURAL LUMBER WITHOUT SAA'S WRITTEN APPROVAL. ADDITIONALLY CUT ENDS OF LUMBERS MUST BE FIELD TREATED WITH AN APPROPRIATE AGENT TO AVOID COMPROMISING DECAY RESISTENCE OF LUMBER. LUMBER USED IN THE WORK SHALL BE KILN DRIED TO AVOID EXCESSIVE SHRINKAGE OR WARPING. "GREEN" LUMBER WITH EXCESSIVE MOISTURE CONTENT SHALL NOT BE USED IN THE WORK. SUBFLOORS, ATTICS, PLENUMS, AND OTHER VOID SPACES SHALL BE APPROPRIATELY VENTILATED. QUALITY FRAMING PRACTICES SHALL BE EMPLOYED IN THE CONSTRUCTION: WOOD COLUMNS AND POSTS SHALL BE SECURED IN POSITION AT TRUE END BEARINGS DESIGNED TO PROTECT AGAINST DECAY OR OTHER DAMAGE. STUDS FOR WALLS AND PARTITIONS SHALL BE AS REQUIRED BY APPLICABLE STANDARDS OR SPECIFIC DETAILS, WHICHEVER ARE MORE RESTRICTIVE, BUT NO LESS THAN: 2X4 AT 16" o.c. FOR ANY WALL OR PARTITION. 2X6 AT 16" o.c. FOR STUDS OVER 9'-0" HIGH, CARRYING COMBINED FLOOR LOADS FROM MORE THAN ONE LEVEL OR EXTERIOR WALLS (UNO) DOUBLE TOP PLATES MATCHING STUDS FOR SIZE AND GRADE SHALL BE PROVIDED AT ALL WALLS (UNO). SPLICES IN PLATES, IF USED, SHALL BE STAGGERED NO LESS THAN 4'-0" o.c. 4X6 OR BETTER HEADER BEAMS OR LINTELS SHALL BE PROVIDED AT ALL OPENINGS IN WALLS AND PARTITIONS. CONTINUOUS HORIZONTAL 2X FIRE BLOCKING OF DEPTH TO MATCH STUDS SHALL BE PROVIDED AT FLOORS, CEILINGS, SOFFITS AND AT NO MORE THAN 8'-0" o.c. VERTICALLY IN ALL STUD WALLS. BORED HOLES IN STUDS SHALL BE PERMITTED ONLY WITHIN THE FOLLOWING RESTRICTIONS: HOLES SHALL NOT APPROACH WITHIN 3/4" OF EITHER EDGE OF THE STUD. HOLES SHALL NOT OCCUR WIHIN 6" OF ANY OTHER BORED HOLE, CUT, NOTCH, OR END OF THE STUD. HOLE DIAMETER SHALL BE LIMITED TO 60% OF WIDTH AT NON-BEARING STUDS IN INTERIOR PARTITIONS SUPPORTING ONLY THEIR OWN WEIGHT AND 40% OF WIDTH AT ALL OTHER STUDS. NOTCHING OF STUDS SHALL BE PERMITTED ONLY WITHIN THE FOLLOWING RESTRICTIONS: NOTCHES SHALL BE NEATLY MADE WITH PREDRILLED CORNERS AND WITHOUT OVERCUTTING. NOTCHES SHALL NOT OCCUR WITHIN 6" OF ANY OTHER NOTCH, CUT, BORED HOLE, OR END OF THE STUD. NOTCH DEPTH SHALL BE LIMITED TO 40% OF WIDTH AT NON-BEARING STUDS IN INTERIOR PARTITIONS SUPPORTING ONLY THEIR OWN WEIGHT AND 25% OF WIDTH AT ALL OTHER STUDS. NOTCH WIDTH SHALL BE LIMITED TO TWICE MAXIMUM PERMITTED DEPTH BUT IN NO CASE MORE THAN SIX INCHES. ALL STUD WALLS SHALL BE BRACED BY ONE OF THE FOLLOWING METHODS: STRUCTURAL LUMBER a. b. c. d. e. 10. 11. 12. 13. 14. 15. 16. a. b. c. 17. a. b. c. 18. 19. 20. a. b. c. 21. 22. a. b. c. 23. 24. 25. 26. 27. 28. 29. 30. 31. a. b. c. d. 32. 33. 1/2" GYPSUM BOARD SHEATHING WITH 5d COOLER NAILS AT 7" o.c. TO ALL STUDS AND TOP AND BOTTOM PLATES AND AT 12" o.c. AT ALL OTHER STUDS. EDGE BLOCKING NOT REQUIRED. OTHER SHEAR RESISTING FINISH APPROVED BY BUILDING DEPARTMENT FOR EQUAL OR GREATER SHEAR STRENGTH THAN ITEM (a) ABOVE. 1X6 LET IN DIAGONAL BRACING AT NO MORE THAN 25'-0" o.c. ALONG WALL ANGLED TO CROSS AT LEAST FOUR STUD SPACES IN WALL HEIGHT, WITH 2-8d NAILS AT EACH STUD AND AT TOP AND BOTTOM PLATES. APPROVED STEEL STRAP BRACING SIMILAR TO ITEM (c) ABOVE. 5/16" PLYWOOD PANELS AT LEAST 4'-0" WIDE AND EXTENDING FULL HEIGHT OF WALL AT NO MORE THAN 25'-0" o.c. WITH 6d NAILS AT 6" o.c. TO STUDS AT VERTICAL SHEET EDGES AND TO TOP AND BOTTOM PLATES AND AT 12" o.c. AT ALL OTHER STUDS. EDGE BLOCKING NOT REQUIRED. BEAMS OR GIRDERS SUPPORTED BY HANGERS OR STRUCTURAL STEEL SHALL HAVE AT LEAST 3" OF FIRM BEARING IN A DETAIL APPROVED BY SAA (UNO). BEAMS OR GIRDERS SUPPORTED BY CONCRETE OR MASONRY SHALL HAVE AT LEAST 4" OF FIRM BEARING ON SOUND MATERIAL (UNO). BEAMS OR GIRDERS SUPPORTED BY TIMBER SHALL HAVE FULL BEARING ACROSS THE SECTION OF THE POST, GIRDER OR OTHER SUPPORT (UNO). JOISTS OR RAFTERS SUPPORTED BY METAL HANGERS SHALL HAVE AT LEAST 1%% 30 1/2" OF FIRM BEARING (UNO). JOISTS OR RAFTERS SUPPORTED BY CONCRETE OR MASONRY SHALL HAVE AT LEAST 3" OF FIRM BEARING ON SOUND MATERIAL (UNO). JOISTS OR RAFTERS SUPPORTED BY TIMBER SHALL HAVE FULL BEARING ACROSS THE WIDTH OF BEAMS OR GIRDERS OR THE TOP PLATES OF STUD WALLS OR SHALL BE ALIGNED WITH AND FACE NAILED TO STUDS AND SUPPORTED BY A 1X4 RIBBON STRIP (UNO). STABILITY BRACING SHALL BE PROVIDED AT NO MORE THAN 10'-0" o.c. FOR RAFTERS AND 8'-0" FOR JOISTS IN ONE OF THE FOLLOWING WAYS: CONTINUOUS 2X3 CROSS BRIDGING. CONTINUOUS FULL DEPTH BLOCKING. APPROVED METAL BRIDGING. STABILITY BRACING SHALL BE PROVIDED FOR JOISTS AND RAFTERS AT ALL SUPPORTS IN ONE OF THE FOLLOWING WAYS: CONTINUOUS FULL DEPTH BLOCKING. FULL NAILING OF A HANGER APPROVED FOR ROTATIONAL RESTRAINT. END NAILING TO A RIM JOIST OR RAFTER. RAFTERS OR JOISTS WITH COMMON INTERIOR BEARINGS SHALL BE LAPPED AT LEAST 4" OVER SUPPORT AND ATTACHED TO ONE ANOTHER WITH 3-16d NAILS. FLOOR JOISTS UNDER PARTITIONS PARALLEL TO THEIR SPAN SHALL BE DOUBLED (UNO). DOUBLED JOISTS OR OTHER VERTICALLY LAMINATED MEMBERS SHALL BE SECURELY INTERCONNECTED ALONG THEIR ENTIRE LENGTH. FASTENERS SHALL BE PLACED AT TOP AND BOTTOM QUARTER POINTS OF DEPTH AND STAGGERED. FASTENERS FOR 2X MEMBERS LESS THAN 12" DEEP MAY BE 16d NAILS AT 12" o.c. (UNO). FASTENERS FOR OTHER MEMBERS SHALL BE 1/2" DIAMETER BOLTS AT 24" o.c. (UNO). STRUCTURAL FRAMING MEMBERS SHALL NOT BE NOTCHED WITHOUT SAA'S SPECIFIC APPROVAL. BORED HOLES IN JOISTS OR RAFTERS SHALL BE PERMITTED ONLY WITHIN THE FOLLOWING RESTRICTIONS: HOLES SHALL NOT APPROACH WITHIN 2" OF EITHER EDGE OF THE MEMBER. HOLES SHALL NOT OCCUR WIHIN 12" OF ANY OTHER HOLE OR OF THE END OF THE MEMBER. HOLE DIAMETER SHALL BE LIMITED TO ONE-THIRD OF DEPTH. END JOINTS IN ADJACENT BOARDS IN LUMBER SHEATHING SHALL BE SEPARATED BY AT LEAST TWO SUPPORT SPACES AND AT LEAST TWO BOARDS SHALL SEPARATE ANY TWO JOINTS ON THE SAME SUPPORT. NAILS DRIVEN PERPENDICULAR TO GRAIN SHALL BE USED IN FAVOR OF TOE NAILS WHENEVER POSSIBLE. WHEN TOE NAILS MUST BE USED, THEY SHALL BE DRIVEN AT AN ANGLE OF APPROXIMATELY THIRTY DEGREES TO THE FACE AND STARTED APPROXIMATELY ONE-THIRD OF THEIR LENGTH FROM THE END OF THE PIECE. IMPROPERLY INSTALLED TOE NAILS SHALL NOT BE CONSIDERED AS HAVING STRUCTURAL VALUE AND MEMBERS DAMAGED BY IMPROPER TOE NAILING SHALL BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. BOLT HOLES, INCLUDING THOSE AT SILL ANCHORS, SHALL BE NO LESS THAN 1/32" AND NO MORE THAN 1/16" LARGER THAN THE NOMINAL DIAMETER OF THE FASTENER (UNO). OVERSIZE BOLT HOLES SHALL BE SUFFICIENT CAUSE FOR REJECTION OF THE WORK. THE CONTRACTOR SHALL VERIFY AND RETIGHTEN ALL BOLTS PRIOR TO APPLICATION OF FINISH OR TO OTHER CONSTRUCTION WHICH WOULD MADE THEM INACCESSIBLE. NEITHER BOLTS, LAG SCREWS NOR WOOD SCREWS SHALL BE HAMMERED OR OTHERWISE DRIVEN INTO PLACE. DRIVING OF SUCH MEMBERS SHALL BE SUFFICIENT CAUSE FOR REJECTION OF THE FASTENING. FRAMING HARDWARE SHALL BE INSTALLED WITH PROPER SIZE, LOCATION AND NUMBER OF FASTENERS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND CONDITIONS OF RELEVANT APPROVALS. SILL PLATES AT STUD WALLS SHALL BE PROPERLY DETAILED AND ANCHORED: SILLS SHALL BE 3X MINIMUM (UNO). SILLS BEARING ON MASONRY OR CONCRETE SHALL BE SECURED IN POSITION WITH NO LESS THAN 1/2" ANCHOR BOLTS AT 48" o.c. MAXIMUM WITH AT LEAST 7" EMBEDMENT INTO SOUND CONCRETE OR MASONRY GROUT. SILL ANCHOR BOLTS SHALL BE PROVIDED WITHIN 9" OF EACH END OF EACH PIECE AND NO PIECE SHALL HAVE LESS THAN TWO BOLTS. SILL ANCHOR BOLTS SHALL BE ARRANGED TO AVOID INTERFERENCE WITH FRAMING WHENEVER POSSIBLE. WHERE GYPSUM BOARD, PLYWOOD OR OTHER STRUCTURAL SHEATHING IS SPECIFIED IN THE STRUCTURAL DRAWINGS, JOINTS SHALL NOT BE TAPED OR FINISH APPLIED UNTIL ATTACHMENT TO SUPPORTING FRAMING HAS BEEN INSPECTED AND APPROVED. WHERE PLASTER OR STUCCO IS SPECIFIED IN THE STRUCTURAL DRAWINGS, APPLICATION SHALL NOT BEGIN UNTIL LATH TYPE AND ATTACHMENT TO SUPPORTING FRAMING HAS BEEN INSPECTED AND APPROVED. A. 1. B. 1. 2. 3. 4. 5. 6. 7. FOUNDATION EXCAVATION AND CONSTRUCTION SHALL BE ACCOMPLISHED IN A MANNER CONSISTENT WITH DESIGN ASSUMPTIONS: FOOTINGS SHALL BE FOUNDED NO LESS THAN TWO FEET (2'-0") BELOW LOWEST ADJACENT FINISH GRADE, SLAB OR PAVEMENT AND BE EMBEDDED INTO NATIVE SOIL OR CERTIFIED COMPACTED FILL. ALL EXCAVATION AND GRADING OPERATIONS SHALL BE CONDUCTED IN ACCORDANCE WITH REQUIREMENTS OF GOVERNING AUTHORITIES AND IN A MANNER CONSISTENT WITH QUALITY CONSTRUCTION STANDARDS. EXCAVATIONS SHALL BE LAID BACK OR SHORED AS REQUIRED FOR SAFETY AND STABILITY AT ALL STAGES OF THE WORK. ADEQUATE PROVISIONS FOR DRAINAGE AND REMOVAL OF RAINWATER, AND GROUNDWATER IF PRESENT, SHALL BE INCORPORATED INTO TEMPORARY SLOPES OR GRADED SURFACES IN ORDER TO PRESERVE STABILITY AND PROTECT AGAINST ILLEGAL, DANGEROUS, UNSIGHTLY, OR OTHERWISE INAPPROPRIATE RUN- OFF. BACKFILL WHICH WILL SUPPORT STRUCTURAL LOADS SHALL BE PLACED IN LIFTS AND COMPACTED TO AT LEAST 95% OF MAXIMUM DENSITY UNDER THE SUPERVISION OF GEOTECHNICAL ENGINEER. BACKFILL SHALL NOT BE PLACED AGAINST NEW RETAINING STRUCTURES UNTIL THEY AND THEIR SUPPORTS HAVE ACHIEVED THEIR DESIGN STRENGTH UNLESS APPROPRIATE TEMPORARY SUPPORTS ARE PROVIDED. COMPACTION METHODS USED FOR BACKFILL BEHIND RETAINING STRUCTURES SHALL TAKE SURCHARGE OF THOSE STRUCTURES INTO CONSIDERATION. APPROPRIATE TEMPORARY SUPPORTS SHALL BE PROVIDED AS NECESSARY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR TO THE SATISFACTION OF OWNER, LANDLORD, ARCHITECT, BUILDING DEPARTMENT, AND SAA OF ANY DAMAGE TO RETAINING STRUCTURES CAUSED BY PREMATURE BACKFILLING, COMPACTION EFFORTS, OR OTHER CONSTRUCTION SURCHARGE. CONCRETE SHALL NOT BE PLACED IN EXCAVATIONS CONTAINING STANDING WATER WITHOUT PRIOR APPROVAL. REQUESTS FOR SUCH APPROVAL SHALL INCLUDE DETAILED DESCRIPTION OF APPROPRIATE WET PLACEMENT PROCEDURES THAT SHALL BE SUBJECT TO THE APPROVAL OF GEOTECHNICAL ENGINEER, BUILDING DEPARTMENT, AND SAA AND WHICH, IF APPROVED, SHALL BE STRICTLY FOLLOWED. EXCAVATIONS AND FOUNDATIONS A. 1. 2. 3. 4. 5. 6. 7. 8. 9. B. 1. 2. 3. 4. 5. C. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. IN ADDITION TO CODE, THE FOLLOWING SPECIFICATIONS AND STANDARDS APPLY TO STRUCTURAL CONCRETE WORK FOR PROJECT: ACI BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318). ACI CODE OF STANDARD PRACTICE. ASTM C33 FOR AGGREGATE (UNO). ASTM C330 FOR AGGREGATE FOR STRUCTURAL LIGHTWEIGHT CONCRETE (AS SPECIFIED). ASTM C150 TYPE I OR II FOR CEMENT. ALL STRUCTURAL CONCRETE IN CONTACT WITH SOIL SHALL BE MADE WITH TYPE II CEMENT. ASTM C260 FOR AIR ENTRAINING ADMIXTURES WHERE SPECIFIED OR ADDED AT CONTRACTOR'S OPTION. ASTM C494 FOR WATER-REDUCING, RETARDING, ACCELERATING, WATER- REDUCING AND RETARDING OR WATER-REDUCING AND ACCELERATING ADMIXTURES WHERE SPECIFIED OR ADDED AT CONTRACTOR'S OPTION. ASTM C618 FOR FLY ASH OR OTHER POZZOLANIC ADMIXTURES WHERE SPECIFIED OR ADDED AT CONTRACTOR'S OPTION. NO MORE THAN 15% OF THE TOTAL CEMENT CONTENT IN ANY STRUCTURAL CONCRETE MIX SHALL BE SUCH MATERIAL (UNO). ASTM C94 FOR READY-MIXED CONCRETE. ALL STRUCTURAL CONCRETE SHALL BE DELIVERED TO THE SITE READY-MIXED. STRUCTURAL CONCRETE SHALL BE OF SPECIFIED TYPES AND STRENGTHS AND OF QUALITY COMPATIBLE WITH THE REQUIREMENTS OF THE WORK. ALL STRUCTURAL CONCRETE SHALL HAVE AN ULTIMATE COMPRESSIVE STRENGTH OF AT LEAST 3000 PSI AT THE AGE OF 28 DAYS (UNO). STRUCTURAL CONCRETE FOR THIS PROJECT DESIGNED USING 2500 PSI BUT CONTRACTOR TO PLACE 3000 PSI MATERIAL (NO SPECIAL INSPECTION REQUIRED). ALL STRUCTURAL CONCRETE SHALL BE STONE TYPE WITH A FULLY CURED DENSITY BETWEEN 140 AND 150 PCF (UNO). STRUCTURAL LIGHTWEIGHT CONCRETE, WHERE SPECIFIED, SHALL HAVE A FULLY CURED DENSITY BETWEEN 110 AND 120 PCF (UNO). SLUMPS OF STRUCTURAL CONCRETE SHALL BE AS SMALL AS PRACTICAL FOR THE INTENDED APPLICATION AND SHALL COMPLY WITH RECOMMENDATIONS OF REFERENCED STANDARDS AND LIMITATIONS OF THE MIX DESIGN. NO CONCRETE WITH MEASURED SLUMP GREATERTHAN SIX INCHES SHALL BE USED IN THE WORKWITHOUT THE SPECIFIC WRITTEN APPROVAL OF SAA.SLUMP MAY BE MEASURED AT POINT OF PLACEMENT. GROUT AND DRYPACK SHALL BE TREATED AS STRUCTURAL CONCRETE AND SHALL BE SUBJECT TO ALL APPLICABLE REQUIREMENTS OF THESE NOTES (UNO). GROUT SHALL BE A HIGH-STRENGTH SHRINKAGE-COMPENSATING ("NONSHRINK") CEMENTITIOUS MATERIAL OBTAINING AN ULTIMATE COMPRESSIVE STRENGTH OF AT LEAST 5000 PSI ATTHE AGE OF 28 DAYS WHEN TESTED IN ACCORDANCE WITH ASTM C109. GROUT SHALL BE A PRE-ENGINEERED PRODUCT ACCEPTABLE TO BUILDING DEPARTMENT AND SAA. GROUT SHALL BE DELIVERED TO THE SITE PREMIXED IN MANUFACTURERS ORIGINAL PACKAGING. ONLY WATER SHALL BE ADDED ON SITE. GROUT SHALL BE PREPARED AND PLACED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. GROUT SHALL BE MIXED TO A UNIFORM FLUID CONSISTENCY, POURED INTO FORMS AS REQUIRED, AND CHAINED OR RODDED TO ASSURE THAT ALL VOIDS ARE FILLED. GROUT CONTAINING METALLIC ADMIXTURES SHALL NOT BE USED WITHOUT THE WRITTEN APPROVAL OF BOTH ARCHITECT AND SAA. DRYPACK, WHERE SPECIFIED, SHALL BE GROUT MIXED TO A STIFF CLAY-LIKE CONSISTENCY. CARE SHALL BE TAKEN TO ASSURE UNIFORMITY PRIOR TO PLACEMENT. EXISTING CONCRETE OR OTHER POROUS SURFACES AGAINST WHICH GROUT OR DRYPACK IS TO BE PLACED SHALL BE MOISTENED TO PREVENT PREMATURE DEHYDRATION OF THE MATERIAL. INSPECTION REQUIREMENTS FOR STRUCTURAL GROUT AND DRYPACK SHALL BE AS FOR STRUCTURAL CONCRETE EXCEPT THAT CUBES RATHER THAN CYLINDERS MAY BE TAKEN FOR COMPRESSIVE STRENGTH TESTING. CONSISTENCY, POURED INTO FORMS AS REQUIRED, AND CHAINED OR RODDED TO ASSURE THAT ALL VOIDS ARE FILLED. GROUT CONTAINING METALLIC ADMIXTURES SHALL NOT BE USED WITHOUT THE WRITTEN APPROVAL OF BOTH ARCHITECT AND SAA. DRYPACK, WHERE SPECIFIED, SHALL BE GROUT MIXED TO A STIFF CLAY-LIKE CONSISTENCY. CARE SHALL BE TAKEN TO ASSURE UNIFORMITY PRIOR TO PLACEMENT. EXISTING CONCRETE OR OTHER POROUS SURFACES AGAINST WHICH GROUT OR DRYPACK IS TO BE PLACED SHALL BE MOISTENED TO PREVENT PREMATURE DEHYDRATION OF THE MATERIAL. STRUCTURAL CONCRETE D. 1. 2. 3. 4. 5. E. 1. 2. a. b. • • 3. 4. 5. 6. 7. 8. F. 1. 2. 3. 4. 5. G. 1. 2. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MIX DESIGNS. MIX DESIGNS FOR CONCRETE WITH SPECIFIED STRENGTH UP TO 2500 PSI MAY BE BY SUPPLIER AND NEED NOT BE SUBMITTED FOR REVIEW PRIOR TO USE. MIX DESIGNS FOR CONCRETE WITH SPECIFIED STRENGTH GREATER THAN 2500 PSI SHALL BE BY A CALIFORNIA LICENSED CIVIL ENGINEER IN THE EMPLOY OF A CERTIFIED INDEPENDENT TESTING LABORATORY ACCEPTABLE TO BUILDING DEPARTMENT AND SAA. COSTS OF SUCH DESIGN SHALL BE BORNE BY THE CONTRACTOR. CALCIUM CHLORIDE OR OTHER ADMIXTURES CONTAINING CHLORIDE OTHER THAN AS AN IMPURITY SHALL NOT BE USED IN STRUCTURAL CONCRETE WITHOUT THE WRITTEN APPROVAL OF SAA. COPIES OF EACH MIX DESIGN, BEARING THE SEAL AND SIGNATURE OF THEIR DESIGNER AND ACCOMPANIED BY CERTIFIED RESULTS OF 7 AND 28 DAY TRIAL BATCH CYLINDER TEST RESULTS, SHALL BE SUBMITTED TO BUILDING DEPARTMENT AND SAA NO LESS THAN TWO WORKING DAYS BEFORE USE. COPIES OF THE MIX DESIGN SHALL BE PRESENT AT BATCH PLANT AND JOB SITE PRIOR TO USE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING PROPER PREPARATIONS PRIOR TO THE PLACEMENT OF STRUCTURAL CONCRETE. THE CONTRACTOR SHALL DESIGN AND CONSTRUCT COMPETENT FORMS AS REQUIRED AND SHALL BE SOLELY RESPONSIBLE FOR THEIR ADEQUACY. REINFORCEMENT SHALL BE PLACED AS CLOSE TO THE SURFACE OF CONCRETE AS PERMITTED WHILE MAINTAINING MINIMUM COVER AS FOLLOWS (UNO): AT SURFACES CAST AGAINST EARTH -- THREE INCHES (3"). AT SURFACES EXPOSED TO EARTH OR WEATHER: FOR #6 OR LARGER BARS -- TWO INCHES (2"). FOR #5 AND SMALLER -- ONE AND ONE-HALF INCHES (1-1/2"). PROJECTING CORNERS OF EXPOSED CONCRETE STRUCTURAL MEMBERS SHALL BE FORMED WITH 3/4" CHAMFER (UNO). REINFORCING STEEL, ANCHOR BOLTS, AND OTHER INSERTS SHALL BE SECURED IN POSITION BEFORE CONCRETE PLACEMENT. SETTING DURING OR AFTER PLACEMENT SHALL NOT BE PERMITTED (UNO). EXCEPT FOR SIMPLE, SYMMETRICAL, UNIFORM CONFIGURATIONS, THE CONTRACTOR SHALL PREPARE REINFORCEMENT PLACEMENT DRAWINGS. COPIES OF THESE DRAWINGS SHALL BE AVAILABLE FOR REFERENCE ON SITE AT LEAST ONE WORKING DAY BEFORE PLACEMENT OF CONCRETE AND BEFORE ANY INSPECTION OF THE REINFORCEMENT OR FORMWORK. THE CONTRACTOR SHALL COORDINATE WITH ALL TRADES BEFORE PLACEMENT OF CONCRETE TO ASSURE PROPER INCORPORATION OF REQUIRED SLEEVES, INSERTS, CURBS, DEPRESSIONS AND SIMILAR ITEMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADDITIONAL COSTS OF CORRECTIVE ACTION IN CASE OF ITEMS IMPROPERLY LOCATED OR OMITTED FROM CONCRETE PLACEMENT. THE CONTRACTOR SHALL SUBMIT SKETCHES SHOWING SIZE AND LOCATION OF ANY REQUIRED SLEEVE, INSERT, DEPRESSION, OR OTHER MODIFICATION TO STRUCTURAL CONCRETE NOT SHOWN IN THESE STRUCTURAL DESIGN DRAWINGS TO SAA FOR REVIEW AND SHALL OBTAIN ITS APPROVAL BEFORE PLACEMENT. CONCRETE SHALL BE PLACED, FINISHED, AND CURED IN ACCORDANCE WITH THE RECOMMENDATIONS OF REFERENCED STANDARDS. STRUCTURAL CONCRETE WITH SPECIFIED STRENGTH GREATER THAN 2500 PSI SHALL BE PLACED UNDER THE CONTINUOUS SUPERVISION OF A DEPUTY INSPECTOR LICENSED BY BUILDING DEPARTMENT. THIS INSPECTOR'S WORK SHALL INCLUDE PRE-PLACEMENT INSPECTION OF FORMWORK, REINFORCEMENT AND EMBEDDED ITEMS. EXISTING CONCRETE AGAINST WHICH NEW CONCRETE IS TO BE PLACED SHALL BE ROUGHENED TO AT LEAST 1/4" AMPLITUDE TO EXPOSE COARSE AGGREGATE, SANDBLASTED OR OTHERWISE THOROUGHLY CLEANED BY AN APPROVED METHOD, MOISTENED AND SCOURED WITH A CEMENT/WATER PASTE IMMEDIATELY PRIOR TO PLACEMENT OF NEW MATERIAL. COLD JOINTS IN STRUCTURAL CONCRETE SHALL BE MADE AT LOCATIONS INDICATED IN DESIGN DRAWINGS OR APPROVED BY SAA. INCORPORATION OF UNAPPROVED JOINTS SHALL BE SUFFICIENT CAUSE FOR REJECTION OF WORK. CURING COMPOUNDS, IF USED, SHALL BE OF APPROVED TYPES. THE CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL OF CURING COMPOUNDS PROPOSED FOR USE ON SURFACES TO RECEIVE FINISH FROM THE FINISH MANUFACTURER PRIOR TO APPLICATION. FORMS SHALL BE KEPT DAMP AND STRUCTURAL CONCRETE SURFACES EXPOSED TO THE ENVIRONMENT SHALL BE MOIST CURED OR OTHERWISE PROTECTED AGAINST PREMATURE DEHYDRATION FOR AT LEAST 72 HOURS AFTER PLACEMENT. CONCRETE SHALL BE TESTED AND INSPECTED IN ACCORDANCE ACI-318 REQUIREMENTS BY QUALIFIED TECHNICIANS UNDER THE SUPERVISION OF A LICENSED CIVIL ENGINEER. FOUR TEST CYLINDERS FROM EACH 150 YARDS, OR FRACTION THEREOF, POURED IN ANY ONE DAY, SHALL BE SECURED AND TESTED BY AN INDEPENDENT TESTING AGENCY; ONE TO BE TESTED AT 7 DAYS, TWO AT 28 DAYS, AND THE FOURTH HELD IN RESERVE. QUALIFIED FIELD TESTING TECHNICIANS SHALL PERFORM TESTS ON FRESH CONCRETE AT THE JOB SITE, PREPARE SPECIMENS REQUIRED FOR CURING UNDER FIELD CONDITIONS, PREPARE SPECIMENS REQUIRED FOR TESTING IN THE LABORATORY, AND RECORD THE TEMPERATURE OF THE FRESH CONCRETE WHEN PREPARING SPECIMENS FOR STRENGTH TESTS. QUALIFIED LABORATORY TECHNICIANS SHALL PERFORM ALL REQUIRED LABORATORY TESTS. THE CONTRACTOR SHALL REMOVE AND REPLACE ANY CONCRETE WHICH FAILS TO ATTAIN SPECIFIED STRENGTH IN 28 DAYS IF SO DIRECTED BY THE ENGINEER OF RECORD. ANY DEFECTS IN THE HARDENED CONCRETE SHALL BE SATISFACTORILY REPAIRED OR THE HARDENED CONCRETE SHALL BE REPLACED. A. 1. 2. 3. B. 1. 2. 3. 4. 5. 6. 7. 8. C. D. IN ADDITION TO CODE, THE FOLLOWING SPECIFICATIONS AND STANDARDS APPLY TO THE MANUFACTURE, FABRICATION AND INSTALLATION OF REINFORCING STEEL IN STRUCTURAL CONCRETE AND/OR MASONRY WORK FOR PROJECT: CRSI HANDBOOK. ASTM A615 GRADE 60 FOR ALL REINFORCING STEEL (UNO). ASTM A185 FOR COLD DRAWN WELDED WIRE FABRIC (UNO). 4.AWS D1.4 FOR WELDING OF REINFORCING STEEL. QUALITY DETAILING AND CONSTRUCTION STANDARDS SHALL BE OBSERVED. REINFORCEMENT SHALL BE TRACEABLE FROM SOURCE TO SITE AND SHALL BE SAMPLED AND TESTED TO CONFIRM PHYSICAL PROPERTIES AS REQUIRED BY BUILDING DEPARTMENT OR OTHERWISE NOTED IN THE PROJECT SPECIFICATION. REINFORCEMENT DELIVERED TO THE SITE SHALL BE ACCOMPANIED BY APPROPRIATE TESTING REPORTS AND CERTIFICATION, INCLUDING EVIDENCE OF CONFORMANCE WITH SPECIAL DUCTILITY REQUIREMENTS SPECIFIED ABOVE. LACK OF CERTIFICATION OR INADEQUATE CERTIFICATION SHALL BE SUFFICIENT CAUSE FOR REJECTION OF MATERIAL. UNCERTIFIED OR INADEQUATELY CERTIFIED MATERIAL SHALL NOT BE STORED AT THE SITE OR USED IN THE WORK AND IF DELIVERED TO THE SITE SHALL BE IMMEDIATELY REMOVED. SUBJECT TO SAA'S WRITTEN APPROVAL, REINFORCEMENT NOT MEETING THE SPECIAL DUCTILITY REQUIREMENTS SPECIFIED ABOVE (NOTE 2) MAY BE PERMITTED IN LOCATIONS NOT SUBJECT TO YIELDING UNDER SEISMIC LOAD. BARS SHALL BE COLD BENT AS DETAILED OR OTHERWISE NECESSARY AROUND PINS OF REQUIRED RADIUS. REBENDING OF BARS SHALL NOT BE PERMITTED (UNO). BENDS SHALL BE MADE IN SHOP WHENEVER POSSIBLE. BENDING OF IN PLACE BARS IN ANY MANNER WHICH MIGHT CAUSE STRESS TO EXISTING CONCRETE SHALL NOT BE PERMITTED (UNO). RUST, GREASE, MILL SCALE OR OTHER MATERIAL WHICH MIGHT EFFECT BOND TO CONCRETE SHALL BE REMOVED IN AN APPROVED MANNER WITHOUT DAMAGE TO THE REINFORCEMENT AND BEFORE PLACEMENT OF CONCRETE. SEE CONCRETE NOTES FOR PLACEMENT DRAWING REQUIREMENTS. WELDING OF REINFORCEMENT IS NOT PERMITTED, UNLESS SPECIFICALLY DETAILED IN THE CONSTRUCTION DOCUMENTS. ADDITIONAL TRIM AND CRACK CONTROL STEEL MAY BE REQUIRED DURING THE PROGRESS OF THE WORK. AN ALLOWANCE OF AT LEAST ONE PERCENT BY WEIGHT OF THE TOTAL REINFORCEMENT SHALL BE SET ASIDE FOR THIS PURPOSE. SUCH STEEL SHALL BE FABRICATED AND PLACED AT SAA'S DIRECTION. REINFORCING STEEL S-002 DIGITALLY STAMPED AND SIGNED 8.19.2024 EXP: 9.30.2025 1. 2. 3. 4. NOTES: IF "A" BAR IS USED, "C" IS BASED UPON ACI CLASS "B" SPLICE PER DETAIL 1, THIS SHEET. WHERE SINGLE LAYER OF REINFORCEMENT OCCURS, BEND BARS AS SHOWN FOR BARS AT OUTSIDE FACE. AT INTERSECTIONS, ALTERNATE BENDS IN EACH DIRECTION. WHERE SPLICES OF DIFFERENCT SIZE BARS OCCUR, CORNER DOWEL SIZE AND LAPS ARE BASED ON LARGER BAR SIZE. "A" BAR 16 D I A . 16 DIA.16 DIA. 16 DIA. "C" "C " CORNER INTERSECTION ALT. CORNER fy (ksi) BAR SIZE TOP BARS OTHER BARS #3 #4 #5 fc = 3,000 psi #6 #7 #8 #9 #10 #11 #11 #14 #14 HOOKED BAR DEVELOPMENT LENGTH (Ldh) TOP BARS TOP BARS TOP BARS TOP BARS TOP BARS TOP BARS TOP BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS fc = 4,000 psi fc = 5,000 psi fc = 6,000 psi fc = 7,000 psi fc = 9,000 psifc = 8,000 psi fc = 10,000 psi 60 75 75 6 8 10 12 14 16 18 20 22 28 38 47 8 10 12 14 16 18 20 22 28 38 47 7 9 10 12 14 15 17 19 24 33 41 7 9 10 12 14 15 17 19 24 33 41 6 8 9 11 12 14 16 17 21 29 36 8 9 11 12 14 16 17 21 29 36 7 9 10 11 13 14 16 20 27 33 7 9 10 11 13 14 16 20 27 33 7 8 9 11 12 13 15 18 25 31 7 8 9 11 12 13 15 18 25 31 6 8 9 10 11 12 14 17 23 29 8 9 10 11 12 14 17 23 29 7 8 9 10 12 13 16 22 27 7 8 9 10 12 13 16 22 27 7 8 9 10 11 12 15 21 26 7 8 9 10 11 12 15 21 26 60 60 60 60 60 60 60 60 60 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 fy (ksi) BAR SIZE TOP BARS OTHER BARS #3 #4 #5 fc = 3,000 psi #6 #7 #8 #9 #10 #11 #11 #14 #14 BAR DEVELOPMENT LENGTH (Ld) TOP BARS TOP BARS TOP BARS TOP BARS TOP BARS TOP BARS TOP BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS fc = 4,000 psi fc = 5,000 psi fc = 6,000 psi fc = 7,000 psi fc = 9,000 psifc = 8,000 psi fc = 10,000 psi 60 75 75 33 43 54 65 94 107 121 136 151 189 181 227 33 42 50 72 83 93 105 116 145 140 174 37 47 56 81 93 105 118 131 164 157 196 29 36 43 63 72 81 91 101 126 121 151 34 42 50 73 83 94 106 117 146 141 176 32 39 56 64 72 81 90 113 108 135 38 46 67 76 86 96 107 134 128 160 30 35 51 59 66 74 82 103 99 123 35 42 62 70 79 89 99 124 119 148 27 33 48 54 61 69 76 95 92 114 33 40 58 66 74 84 93 116 111 139 31 45 51 57 64 71 89 86 107 37 54 62 70 79 87 109 105 131 29 42 48 54 61 67 84 81 101 36 52 59 66 75 83 104 100 124 27 40 45 51 58 64 80 77 96 60 60 60 60 60 60 60 60 60 25 28 22 25 20 23 18 21 17 20 16 19 15 18 14 26 31 24 28 22 27 21 25 19 24 18 26 31 24 30 23 fy (ksi) BAR SIZE TOP BARS OTHER BARS #3 #4 #5 fc = 3,000 psi #6 #7 #8 #9 #10 #11 #11 #14 BAR LAP SPLICE LENGTH TOP BARS TOP BARS TOP BARS TOP BARS TOP BARS TOP BARS TOP BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS OTHER BARS fc = 4,000 psi fc = 5,000 psi fc = 6,000 psi fc = 7,000 psi fc = 9,000 psifc = 8,000 psi fc = 10,000 psi 60 75 43 56 70 85 122 139 157 177 196 246 43 55 65 94 108 121 137 151 189 48 61 73 105 121 13 7153 170 213 38 47 56 82 94 105 118 131 164 44 55 65 94 108 122 138 152 190 42 51 73 83 94 105 117 147 49 60 87 99 112 125 139 174 39 46 66 77 86 96 107 134 46 55 81 91 103 116 129 161 35 43 62 70 79 90 99 124 43 52 75 86 96 109 121 151 40 59 66 74 83 92 116 48 70 81 91 103 113 142 38 55 62 70 79 87 109 47 68 77 86 98 108 135 35 52 59 66 75 83 104 60 60 60 60 60 60 60 60 33 36 29 33 26 30 23 27 22 26 21 25 20 23 18 34 40 31 36 29 35 27 33 25 31 23 34 40 31 39 30 USE MECHANICAL SPLICE 1. 2. 3. 4. 5. 6. 7. 8. NOTES: TABULATED VALUES IN INCHES FOR NORMAL CONCRETE AND UNCOATED REINFORCING STEEL, FOR LIGHTWEIGHT CONCRETE INCREASE LENGTHS BY 30% FOR EPOXY COATED INCREASE LENGTHS BY 50%. TABULATED LAP SPLICE LENGTHS ARE FOR CLASS "B" SPLICES AS DEFINED IN ACI 318.9 FOR CLASS A SPLICES REDUCE LENGTH BY 30%. CLASS A SPLICES MAY BE USED WHEN SPECIFICALLY CALLED ON DRAWINGS AND IF ONE HALF OR LESS OF THE TOTAL NUMBER OF BARS ARE SPLICED WITHIN THE REQUIRED LAP LENGTH. BAR DEVELOPMENT LENGTHS AND SPLICE LENGTHS OF INDIVIDUAL BARS WITHIN A BUNDLE SHALL BE INCREASED BY 20% FOR A 3-BAR BUNDLE AND 33% FOR A 4-BAR BUNDLE. TOP BARS ARE DEFINED AS HORIZONTAL BARS WITH MORE THAN 12" OF CONCRETE CAST BELOW THE BAR. FOR COMPRESSION LAP SPLICE LENGTH (ONLY WHERE INDICATED ON DRAWINGS) USE 30 BAR DIAMETER, NOT LESS THAN 12". MECHANICAL SPLICES MAY BE USED AT CONTRACTOR'S OPTION. MECHANICAL SPLICES SHALL BE TYPE 2 AS DEFINED IN ACI 318 AND SHALL DEVELOP IN TENSION AT LEAST 125% OF THE SPECIFIED YIELD STRENGTH (Fy) OF THE SPLICED BAR. WHERE MECHANICAL SPLICES ARE USED, STAGGER ADJACENT SPLICES BY 24" O.C. THE SMALLER BAR SPLICE LENGTH SHALL BE USED WHEN SPLICING DIFFERENT SIZED BARS. Ld h 12d CRITICAL CONCRETE PLANE MINIMUM BEND DIAMETERS: D=6d FOR #3 TO #8 D=8d FOR #9 TO #11 D=10d FOR #14 TO #18 MINIMUM BEND DIAMETERS: D=4d FOR #3 TO #5 D=6d FOR #6 TO #8 CRITICAL CONCRETE PLANE L L WIRE TIES TYPICAL 2 1 / 2 " M i n . 4d O R L d h 12d FOR #6 TO #8 6d FOR #3 TO #5 NOTE: ALL FOOTINGS POURED AGAINST EARTH ARE SUBJECT TO APPROVAL OF SOIL AND STRUCTURAL ENGINEERS AND MUST BE CONSTRUCTED IN THE MANNER SHOWN UNLESS SPECIFICALLY NOTED OTHERWISE CONST. JOINT PER TYP. DETAIL FUTURE SLAB 6" MIN. CONT. CLEAN - OUT EA. SIDE STAKES NOT PERMITTED WITHIN FOOTING AREA FUTURE WALL FORM FOR 1 1/2" MIN. STARTER WALL REQUIRED. SCREED TOP LEVEL. AFTER CONCRETE HAS SET REMOVE LAITANCE AND SCUM FROM CONSTRUCTION JOINT. PROVIDE EDGE PLANK TO PREVENT RAVELLING DURING CONCRETE PLACEMENT CUT BACK SPALL NEAT CUT TRENCH NO FORMWORK PERMITTED BELOW GRADE UNLESS FULLY FORMED FORMWORK SPECIFICATION APPLICABLE * -FOOTINGH WIDTH AS SHOWN ON DRAWINGS + 2" 1. 2. 3. 4. 5. NOTES: SLABS SHALL BE PLACED IN LONGITUDINAL STRIPS OR SECTIONS HAVING A MAXIMUM WIDTH OF 20'-0". SLABS SHALL BE SUBDIVIDED BY CONTROL JOINTS HAVING A MAXIMUM SPACING OF 15'-0". CONTROL JOINTS TO BE PERPENDICULAR TO CONSTRUCTION JOINTS. REINFORCING SHALL BE SECUREDLY PLACED IN MIDDLE OF SLAB. CURING SHALL BE MAINTAINED PER WRITTEN SPECIFICATIONS. 1-1/2" x 3-1/2" CONTINUOUS KEY TRANSVERSE CONTROL JOINT LONGITUDINAL CONSTRUCTION JOINT CONCRETE PLACED FIRST SHOWN HATCHED DEEP "V" CUT JOINT OR SAW CUT WITHIN SEVEN TO TWENTY HOURS AFTER PLACEMENT CONSTRUCTION JOINT 3/ 4 " CONSTRUCTION JOINT 4" . 4" . 3/ 4 " 8" 1' - 0"DEEP "V" CUT JOINT OR SAW CUT WITHIN SEVEN TO TWENTY HOURS AFTER PLACEMENT NOT TO SCALE 4 Concrete Wall Corners NOT TO SCALE 1 Tension Lap Splice & Embedment Length in Concrete NOT TO SCALE 8 Footing Form Against Soil PAGE # NOTES AS NOTEDSCALE: DATE: PHONE: 323-448-4682 TY P I C A L D E T A I L S AT T A C H E D A D U 90 7 D I A N N E S T , SA N T A A N A , C A 9 2 7 0 1 04/28/2025 NOT TO SCALE 2 Typical Slab on Grade Joints S-003 DIGITALLY STAMPED AND SIGNED 8.19.2024 EXP: 9.30.2025 MAX. DSIZE NOTE : NOTCHING JOIST IS NOT ACCEPTABLE WITHOUT STRUCTURAL ENGINEER'S APPROVAL 1 3/4"2x6 3" 4 3/8" 3 3/4" 2 3/8" 2x12 2x14 2x8 2x10 2" M I N . 2" M I N . 2x JOIST. SEE PLAN. 12" MIN. D D EXT. & BRG. STUDSNON-BRG STUDS NOTE: NOTCH AND BORING NOT TO OCCUR IN SAME STUD SECTION.1 3/8"40%2 1/8" 2x6 2" 7/8" 2x4 60% 25% 3 1/4" 1 3/8" NOTCH/BORE % OF STUD 5/8" MIN. TYP. WIDTH, MAX. 60% STUD NOTCH, MAX. 40% STUD WIDTH STUD WIDTH NOTCH, MAX. 25% STUD WIDTH 5/8" MIN. TYP. STUD WIDTH WIDTH, MAX. 40% STUD SYM. INTERMEDIATE NAILING - 10" O.C. AT FLOORS, 12" O.C. AT ROOFS. SAME SIZE AS EDGE NAILS. 3x4 FLAT BLOCK WHERE REQ'D BOUNDARY NAILING EDGE NAILING NOTES: 1. PLYWOOD THICKNESS AND NAILING PER PLAN. 2 FACE GRAIN OF PLYWOOD SHALL RUN PERPENDICULAR TO SUPPORTS. 3.NAILS SHALL HAVE MIN. 3/8" EDGE DISTANCE AND SHALL NOT BE OVER-DRIVEN THRU OUTER PLY. 4.CONTINUOUS PANEL EDGES SHALL RECEIVE BOUNDARY NAILING. 5.STAGGER PLYWOOD JOINTS. 1 2 3 4 4'x8' PLYWOOD PANELS 1 2 3 4 JOISTS OR RAFTERS TYPICAL CORNER CONDITION TYPICAL CONNECTION AT INTERSECTION INTERSECTION WITH OR HOLDOWNCONDITION AT POST OR HOLDOWN ANCHOR NOTES: STUDS IN DIRECT CONTACT SHALL BE NAILED TOGETHER WITH 16d @ 12" O.C. (STAGGERED IF POSSIBLE). STUDS SEPARATED BY SHEATHING SHALL BE NAILED WITH 20d @ 12" O.C. U.N.O. PRE-DRILLED HOLES ARE REQUIRED FOR 20d SPIKES. SHTG. WHERE INDICATED ON PLANS. TYP. SEE SCHDULE FOR NAILING 3x MIN. POST OR REQ'D MEMBER AT HOLDOWN ANCH. Field Nail U.N.O.E.N. SHTG. WHERE INDICATED ON PLANS. TYP. SEE SCHDULE FOR NAILING E.N. E.N. B.N. E.N. E.N. E.N. E.N. POST OR REQ'D. MEMBER AT HOLDDOWN ANCHOR FIELD NAIL TYP. U.N.O.E.N. B.N. E.N. PROVIDE STUD BELOW PLATE SPLICE 2X DOUBLE TOP PLATE USE 16d @ 16" O.C. LAP SPLICE AT EA. SIDE OF TOP PLATE 4' - 0" MIN. LAP 6" NOTCH STUDS AS REQ'D (5) 3/4" DIA. BOLTS @ 9" O.C.6" (26) 16d ALT. 3" MIN. DOUBLE TOP PLATE SILL PLATE B/ 2 M A X . 5"3"5" MAX.MAX.MAX. B 5" MIN. 9" MIN. 5" MIN. 9" MAX. 5" MIN. 9" MAX. B "D " A B WHERE DEPTH OF NOTCH "D" IS GREATER THAN B/5 PROVIDE ANCHOR BOLT EACH SIDE OF NOTCH AS PER END REQUIREMENT. INDICATES ANCHOR BOLT C OF PLATEL END OF SILL PLATE 8-16d EACH SIDE OF NOTCH (4-EACH PLATE)NOTCH WHERE NOTCH IS GREATER THAN 1" PROVIDE 12 GA. STRAP WITH WIDTH SAME AS DOUBLE TOP PLATE. 16d @ 12" O.C. STAGGERED CORNER INTERSECTION DBL. STUD WHEN OPNG EXCEEDS 4'-0" JACK STUD (PROVIDE (2) JACK STUDS AT OPNGS OVER 6'-0" WIDE) SIMPSON A35 (A34 @ 2x4) 16d@12"STAGGERED, EA STUD TO STUD 2x PRESSURE TREATED D.F. SILL EXCEPT AS NOTED MIN. SILL BOLTS 5/8" DIA. x 12" @ 4'-0" O.C. (U.O.N.) 2x BLK. AT MID-HEIGHT OR 8'-0" MAX. (2) 2x TOP PLATE LINTEL (SOLID OR BUILT-UP) PER PLANS 3/4" MIN., 1" MAX. DRYPACK AS REQ'D. TO LEVEL. WHERE TROWELED SURFACE IS LEVEL (1/8" MAX. IN 10-0") DRYPACK IS NOT REQ'D. (4)16d SEE DETAIL A FOR ANCHOR BOLT BRSAAING DETAIL 4'-0" MIN. PLATE SPLICE 9" Max 5" Min 2x BLOCKING ANCHOR BOLTDRY PACK WHERE REQ'D 2x STUDS 2x FLAT DETAIL A OPNG HEADER UP TO 6'-0"4x6 UP TO 3'-0"4x4 4x8 DOOR AND WINDOW HEADER SCHEDULE UP TO 8'-0" NOTES: 1.HEADERS TO BE DF-L NO. 1. HEADER SIZES PER SCHEDULE U.O.N. ON PLANS. 2. STRAPS ARE TO BE INSTALLED OVER PLYWOOD. 3.PROVIDE E.N. TO ALL FRAMING MEMBERS AROUND OPENINGS AND BLOCKING. HEADER PER SCHEDULE (2) 2x SILL AT WINDOW OPENINGS 2x TRIMMER (FULL HEIGHT AT DOOR OPENINGS) INTERRUPT TRIMMER AT WINDOW SILL AS OCCURS SIMPSON CMSTC16 STRAP T&B OF OPENING STRAP PER SCHEDULE AT WINDOW OPENING DOUBLE STUD CRIPPLE STUDS TO MATCH TYPICAL WALL FRAMING A35 AT HEADER TO TRIMMER A35 AT SILL 4x BLOCKING AT STRAPS TYP. 24" MIN. NOTES: 1.HOLDOWN HARDWARE SHALL BE SECURED IN PLACE PRIOR TO FOUNDATION INSPECTION. 2.HOLDOWN CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE APPROVED PLATE WASHERS. 3.HOLDOWN CONNECTOR BOLTS SHALL BE TIGHTENED PRIOR TO COVERING THE WALL FRAMING. 4.SEE FOUNDATION PLAN FOR LOCATION AND SHEARWALL INFORMATION. HDU2 SSTB20 MODEL NO. MONO POUR SSTB20 20 MODEL NO. DIA.MIN. EMBED 4x POST PLYWOOD SHEATHING (SEE PLAN)HD HOLDOWN (SEE PLAN) 3 x P.T. SILL PLATEA.B. (SEE PLAN) CONC. CURB OR FOOTING 5/8" CONNECTION NAILING NAILING SCHEDULE 1.JOIST TO SILL OR GIRDER, TOENAIL 2.BRSAAING TO JOIST, TOENAIL EACH END 3.1"x6" SUBFLOOR OR LESS TO EACH JOIST, FACE NAIL 4.WIDER THAN 1"x6" SUBFLOOR TO EACH JOIST, FACE NAIL 5.2" SUBFLOOR TO JOIST OR GIRDER, BLIND AND FACE NAIL 6.SOLE PLATE TO JOIST OR BLOCKING, TYPICAL FACE NAIL 7.TOP PLATE TO STUD, END NAIL 8.STUD TO SOLE PLATE 9.DOUBLE STUDS, FACE NAIL 10.DOUBLED TOP PLATES, TYPICAL FACE NAIL DOUBLE TOP PLATES,LAP SPLICE 11.BLOCKING BETWEEN JOIST OR RAFTERS TO TOP PLATE, TOENAIL 12.RIM JOIST TO TOP PLATE, TOENAIL 13.TOP PLATES, LAPS AND INTERSECTIONS 15.CEILING JOIST TO PLATE, TOENAIL 16.CONTINUOUS HEADER TO STUD, TOENAIL 17.CEILING JOIST, LAPS OVER PARTITIONS, FACE NAIL 18.CEILING JOIST TO PARALLEL RAFTERS, FACE NAIL 19.RAFTER TO PLATE, TOENAIL 20.1" BRACE TO EACH STUD AND PLATE, FACE NAIL 21.1"x8" SHEATHING OR LESS TO EACH BEARING, FACE NAIL 22.WIDER THAN 1"x8" SHEATHING TO EACH BEARING, FACE NAIL 23.BUILT UP CORNER STUDS 24.BUILT UP GIRDER AND BEAMS 25.2" PLANKS 32.PANEL SIDING (TO FRAMING): 1/2" OR LESS 25/32" 33.FIBERBOARD SHEATHING: 1/2" 25/32" 34.INTERIOR PANELING 1/4" 3/8" 16d AT 24" O.C. NO. 11 GA. 6d NO. 11 GA. 8d 8 6d 4d 11 4 10 7 4 68d 66d 8 16d AT 16" O.C. 2-8d 3-8d 3-8d 2-8d 3-16d 3-16d 3-8d 4-8d 4-8d TOENAIL OR 2-16d END NAIL 16d AT 16" o.c. 8d AT 6" O.C. 3-8d 8-16d 2-16d 3-16d PER 16" 2-16d 16d AT 24" O.C. 3-8d 2-8d 3-8d 2-16d 2-8d 1 2 - 16d AT EACH BEARING 14.CONTINUOUS HEADER, TWO PIECES 16d AT 16" O.C. ALONG EA. END 20d AT 32" O.C. AT TOP AND BOTTOM AND STAGGERED 2-20d AT ENDS AND AT EA. SPLICE 26.COLLAR TIE TO RAFTER, FACE NAIL 3-10d 27.JACK RAFTER TO HIP 3-8d TOENAIL OR 2-16d FACE NAIL 28.ROOF RAFTER TO 2x RSAAE BEAM 2-16d TOENAIL OR FACE NAIL 29.JOIST TO BAND JOIST, FACE NAIL 3-16d 30.LEDGER STRIP 3-16d 31.WOOD STRUCTURAL PANELS AND PARTICLEBOARD SUBFLOOR, ROOF AND WALL SHEATHING (TO FRAMING) 1/2" AND LESS 2 3,126d 19/32" TO 3/4"48d OR 6d 7/8" TO 1"38d 1 1/8" TO 1 1/4"410d OR 8d 5 5 SINGLE FLOOR (COMBINATION SUBFLOOR- UNDERLAYMENT TO FRAMING) 3/4" AND LESS 56d 7/8" TO 1"58d 1 1/8" TO 1 1/4"410d OR 8d 5 1. COMMON OR BOX NAILS ARE PERMITTED TO BE USED EXCEPT WHERE OTHERWISE STATED. 2.NAILS SPACED AT 6 INCHES ON CENTER AT EDGES, 12 INCHES AT INTERMEDIATE SUPPORTS EXCEPT 6 INCHES AT SUPPORTS WHERE SPANS ARE 48 INCHES OR MORE. FOR NAILING OF WOOD STRUCTURAL PANEL AND PARTICLE BOARD DIAPHRAGMS AND SHEAR WALLS, REFER TO CBC SECTION 2305. NAILS FOR WALL SHEATHING ARE PERMITTED TO BE COMMON, BOX OR CASING. 3. COMMON OR DEFORMED SHANK 4. COMMON 5.DEFORMED SHANK 6.CORROSION-RESISTANT SIDING OR CASING NAIL 7.FASTENERS SPACED 3 INCHES ON CENTER AT EXTERIOR EDGES AND 6 INCHES ON CENTER AT INTERMEDIATE SUPPORTS, WHEN USED AS STRUCTURAL SHEATHING. SPACING SHALL BE 6 INCHES ON CENTER ON THE EDGES AND 12 INCHES ON CENTER AT INTERMEDIATE SUPPORTS FOR NON-STRUCTURAL APPLICATIONS. 8.CORROSION-RESISTANT ROOFING NAILS WITH 7/16" DIAMETER HEAD AND 1/2" LENGTH FOR 1/2" SHEATHING AND 1 3/4" LENGTH FOR 25/32" SHEATHING 9.CORROSION RESISTANT STAPLES WITH NOMINAL 7/16" CROWN AND 1 1/8" LENGTH FOR 1/2" SHEATHING AND 1 1/2" LENGTH FOR 25/32" SHEATHING. PANEL SUPPORTS AT 16 INCHES (20 INCHES IF STRENGTH AXIS IN THE LONG DIRECTION OF THE PANEL, UNLESS OTHERWISE MARKED). 10.CASING OR FINISH NAILS SPACED 6 INCHES ON PANEL EDGES, 12 INCHES AT INTERMEDIATE SUPPORTS. 11.PANEL SUPPORTS AT 24 INCHES. CASING OR FINISH NAILS AT 6 INCHES ON PANEL EDGES, 12 INCHES AT INTERMEDIATE SUPPORTS. 12.FOR ROOF SHEATHING APPLICATIONS, 8d NAILS ARE THE MINIMUM REQUIRED FOR WOOD STRUCTURAL PANELS. 13.STAPLES SHALL HAVE A MINIMUM CROWN WIDTH OF 7/16 INCH. 14.FOR ROOF SHEATHING APPLICATIONS, FASTENERS SPACED 4 INCHES ON CENTER AT EDGES, 8 INCHES AT INTERMEDIATE SUPPORTS. 15.FASTENERS SPACED 4 INCHES ON CENTER AT EDGES, 8 INCHES AT INTERMEDIATE SUPPORTS FOR SUBFLOOR AND WALL SHEATHING AND 3 INCHES ON CENTER AT EDGES, 6 INCHES AT INTERMEDIATE SUPPORTS FOR ROOF SHEATHING. 16.FASTENERS SPACED 4 INCHES ON CENTER AT EDGES, 8 INCHES AT INTERMEDIATE SUPPORTS. SOLE PLATE TO JOIST OR BLOCKING, AT BRACED WALL PANELS NOT TO SCALE 4 Typical Boring of Joists NOT TO SCALE 3 Typical Notching & Boring of Studs NOT TO SCALE 12 Typical Plywood Layout & Nailing NOT TO SCALE 13 Shear Wall Corners & Intersections NOT TO SCALE 7 Double Top Plate Splice NOT TO SCALE 5 Notching of Plates NOT TO SCALE 8 Typ. Stud Wall Corners & Intersections NOT TO SCALE 9 Stud Wall Framing NOT TO SCALE 11 Typical Framed Opening in Shearwall NOT TO SCALE 10 Typical Detail at Holdown PAGE # NOTES AS NOTEDSCALE: DATE: PHONE: 323-448-4682 TY P I C A L D E T A I L S AT T A C H E D A D U 90 7 D I A N N E S T , SA N T A A N A , C A 9 2 7 0 1 04/28/2025 NOT TO SCALE 6 Nailing Schedule S-004 DIGITALLY STAMPED AND SIGNED 8.19.2024 EXP: 9.30.2025 L = 15' - 6"1 AA L = 13' - 5" 1A A L = 7 ' - 0 " 1 A A L = 1 6 ' - 0 " 1 A A (E) FTG. (N) 12" FTG. (N ) 1 2 " F T G . (N) 4" THK. SLAB ON GRADE. REFER TO FOUNDATION NOTE #2. (4) #4X16" DOWELS SIMPSON SET-XP TO (E) FTG WITH 8" EMBED. [ESR 2508] (4) #4X16" DOWELS SIMPSON SET-XP TO (E) FTG WITH 8" EMBED. [ESR 2508] 15 15 15 19 18 16 TYP. (E) FOOTING AND SLAB ON GRADE TO REMAIN L = 15' - 6"1 L = 13' - 5" 1 L = 7 ' - 0 " 1 L = 1 6 ' - 0 " 1 (E) 2x8 @ 16" O.C. [R.R.] V.I.F. (E ) 2 x 8 @ 1 6 " O . C . [ R . R . ] V . I . F . (E) 2x6 @ 16" O.C. [C.J.] V.I.F. (N ) 2 x 8 @ 1 6 " O . C . [ R . R . ] (N ) 2 x 8 @ 1 6 " O . C . [ R . R . ] (N ) 2 x 6 @ 1 6 " O . C . [ C . J . ] (N ) 2 x 6 @ 1 6 " O . C . [ C . J . ] LINE OF EXPOSED CEILING (E ) R I D G E (E) H I P (E) HDR (E) HDR 6x12 DF#1 RIDGE2x10 RIDGE BOARD 4x 6 H D R 4x 6 H D R 4x 6 H D R 4x6 HDR 4x6 HDR 4x6 HDR (N) CALIFORNIA FRAMING PER DETAIL /7 S-2.0 1 2 3 45 12 TYP. 11TYP. 8 9 6 4" Slab On Grade 4" Crusher run Gravel Base (1/2" min agg size) Compacted Fill 10 Mill Vapor Barrier Legend: Wall Above 2x @ 16 Direction of framing and span Location / extent of framing Framing member and spacing Wall Below Min. Shear Wall Length Wood Post Below Wood Post AboveSIZE Shear Wall Above L = 5' - 3"2 A A Holdown Above California Framing PAGE # NOTES AS NOTEDSCALE: DATE: PHONE: 323-448-4682 FO U N D A T I O N A N D F R A M I N G P L A N S AT T A C H E D A D U 90 7 D I A N N E S T , SA N T A A N A , C A 9 2 7 0 1 04/28/2025 S-1.0 1/4" = 1'-0" A Foundation Plan S-1.0 1/4" = 1'-0" B Roof / Ceiling Framing Plan HD Post Fasteners Comments HDU2 Holdown Schedule 4x4 (6) SDS ESR-2330 ID A HDU4 4x4 (10) SDS ESR-2330B HDU5 4x4 (14) SDS ESR-2330C 1. 2. 3. 4. 5. 6. 7. Holdown Notes Post sizes are minimums. Coordinate with wall framing and post sizes indicated on plans. SDS = Simpson SDS25xxx (provide 1-1/2" min embed). Hold-down connector bolts into wood framing require approved plate washers. Hold-downs shall be finger tight and 1/2 wrench turn just prior to covering the wall framing. Connector bolts into wood framing require steel plate washers on the post on the opposite side of the anchorage device. Plate size shall be a minimum of 0.299 inch by 3 inches by 3 inches. (2305.5) Where double holdowns are specified at shearwall use 6x post and vertically stagger devices if necessary to avoid fasteners from fouling each other. Provide Simpson SB anchor bolts at all holdowns. Coordinate anchor bolt diameter with holdown hardware. Hold-down hardware must be secured in place prior to foundation inspection. Bolts, fasteners and framing hardware in contact with preservative treated lumber to be hot dipped galvanized. 1. 2. 3. 4. 5. 6. Shear Wall Notes All new exterior walls not otherwise designated as shear wall to be sheathed per item 1 in the Shear Wall Schedule. Sill anchors to concrete to be A307 anchor rods with 7" embedment in foundation. If multiple pours used, specified embedment must be contained within top pour. If not, full embedment must be achieved in lower pour level. All sill anchors to have 2-1/2" square x 1/4" plate washers under nuts. Install sill anchors in centerline of sill plate. Sill attachment to wood to be with Simpson SDS screws 1/4" with 1-1/2" min embed into subfloor or beams/framing below subfloor. Where sheathing nailing is less than 4" on center or where sheathing is applied to both sides of studs use 3x studs at panel edges or panel joints. Sill and sole plates to be 3x minimum thickness. Use pressure treated material where in contact with concrete. See Structural Lumber section of General Notes for additional information. Contractor responsible for maintaining copies of referenced ICC-ESR reorts and/or conditions of listing shall be made available at the job site. 1. 2. 3. 4. 5. 6. Foundation Plan Notes Footings are to be founded a minimum of 2'-0" below adjacent grade. Slab on grade to be minimum 4" thick with #4 @ 16" o.c. each way chaired at mid thickness. Slab to be underlain by 10 mil vapor barrier/4" crusher-run base compacted by mechanical means in accordance with the Soils Report. Vapor barrier to be in conformance with ASTM E1643 and installed per manufacturer's recommendations with care taken to seal seams, penetrations and perimeter edges. See slab detail below. Control joints are required for the slab on grade at a maximum spacing of 15' on centers each way. The contractor is required to submit a plan of proposed control joints to the Architect and SAA prior to placing concrete. See Typical Details for additional information. Concrete curbs required along some exterior walls. Coordinate with Arch for extent and configuration of curbs. See structural detail sheets for relevant construction information where curbs required. Foundation sills shall be naturally durable or preservative-treated wood. If adverse soil conditions are encountered, a soils investigation report may be required 1. 2. 3. 4. 5. 6. 7. Framing Plan Notes Roof sheathing to be 1/2" CD-X (Span Rating 32/16) with face grain perpendicular to framing direction with panel joints staggered. Nail to framing with 10d @ 6, 6,12. Wall framing to be as follows unless noted otherwise: Exterior walls = 2x4 @16 min (match existing) Interior bearing walls = 2x4 @ 16 min Interior non-bearing walls = 2x4 @ 16 Plumbing walls = 2x6 @ 16 (or 2x4 @ 16 with furring to avoid cutting structural framing) All diaphragm to utilize common nails or galvanized box nails. All shearwall nailing shall utilize hot dipped galvanized box nails. All bolt holes shall be drilled 1/32" to 1/16" oversized. For lag bolts provide lead hole 40% to 70% of threaded shank diameter and full diameter at smooth shank portion. Contractor responsible for maintaining copies of referenced ICC-ESR Reports and/or conditions of Listing at the job site. Roof diaphragm nailing to be inspected before covering. Face grain of plywood shall be perpendicular to supports. Floor shall have tongue and groove or blocked panel edges. Plywood spans shall conform with 2304.7 Sill Attachment Concrete Wood Top AttachmentSheathingNailing Capacity (ASD) Shear Wall Schedule ID 5/8"@32 SDS@16 A35@241/2" CDX 10d@6,12 310 plf1 S-100 DIGITALLY STAMPED AND SIGNED 8.19.2024 EXP: 9.30.2025 S-200 S-200 S-200 S-200 S-200 S-200 S-200 S-200 S-200 S-200 S-200 S-200 S-200 S-200 S-200 S-200 PAGE # NOTES AS NOTEDSCALE: DATE: PHONE: 323-448-4682 DE T A I L S AT T A C H E D A D U 90 7 D I A N N E S T , SA N T A A N A , C A 9 2 7 0 1 04/28/2025 S-200 DIGITALLY STAMPED AND SIGNED 8.19.2024 EXP: 9.30.2025 (N) SHEATHING PER PLAN VERIFY (E) SILL ATTACHMENT W/ SHEAR WALL SCHEDULE. ADD/REPLACE DAMAGED ANCHORS WITH SET-XP ADHESIVE 5/8" ANCHOR RODS, 6" MIN EMBEDMENT. AT MID FOOTING [ESR-2508] NOTE: SPECIAL INSPECTION REQUIRED (N) E.N. (N) SHEAR WALL WHERE OCCURS (E) FOOTING TO REMAIN (E) SLAB ON GRADE 18 " V . I . F . V.I.F. 12" MIN SHEATHING PER PLANS ROOF RAFTERS PER PLANS SIMPSON LSSU (OR LRUZ) HANGER SIMPSON LSTA24 STRAP @ EACH OTHER RAFTER B.N. RIDGE BEAM PER PLAN2-16d TOE NAIL EA. SIDE EACH RAFTER B.N. RIDGE BOARD PER PLAN SHEATHING PER PLANS ROOF RAFTERS PER PLANS SIMPSON LSTA24 STRAP @ EACH OTHER RAFTER 2X FLAT MEMBER TO RECIEVE CALI FRAMING JOISTS SIMPSON A35 EA JOIST CALIFORNIA FRAMING JOISTS, 2X6 AT 16" O.C. SHEATHING PER PLANS ROOF STRUCTURAL SHEATHING AS OCCURS WHEN JOISTS PARALLEL TO 2X8 FLAT ABOVE, ADD ADDITIONAL JOIST ALIGNED SDS253500 AT 32" O.C. 2X BLOCKING (E) JOISTS AS OCCUR CONCRETE SLAB ON GRADE 2x4 STUDS @ 16" O.C. 2x4 W/ (2) 16d NAILS EA. SIDE JOISTS PER PLAN SIMPSON A34 @ 32" O.C. MAX CONCRETE SLAB ON GRADE 2x4 STUDS @ 16" O.C.JOISTS PER PLAN SIMPSON A34 @ 32" O.C. MAX 2x P.T. PLATE RAMSET TO CONCRETE @ 24" O.C. [ESR-2690] 2x P.T. PLATE RAMSET TO CONCRETE @ 24" O.C. [ESR-2690] 1/2" DRYWALL EA. SIDE 1/2" DRYWALL EA. SIDE BEAM PER PLAN POST PER PLAN SIMPSON CCQ POST CAP SIMPSON MST37 SIMPSON ECCQ POST CAP SIMPSON CCQ POST CAP SIMPSON CCCQ / CCTQ POST CAP BEAM PER PLAN POST PER PLAN SHEATHING PER PLAN SHEATHING PER PLANS SIMPSON A35 PER SHEAR WALL SCHEDULE E.N. B.N. 2X BLOCKING ROOF RAFTERS PER PLANS PER ARCH. FLASHING/GUTTER PER ARCH 2X FASCIA (5) 10d AT RAFTER TO CEILING JOIST LAP CEILING JOIST PER PLAN SIMPSON H2.5A EVERY THIRD RAFTER (2) #4 CONT. TOP AND BOTT #4 BENT DOWELS @ 16" O.C. CONSTRUCTION JOINT AT CONTRACTOR'S OPTION FINISH SURFACE PER ARCH. PER PLAN SHEATHING PER PLAN P.T. SILL PLATE WITH ANCHORS PER SHEARWALL SCHEDULE E.N. SHEAR WALL WHERE OCCURS FINISH SEE ARCH #4 @ 16" AT CURB EM B E D M E N T 24 " M I N . 8" MIN. FROM SILL TO EXTERIOR * CONCRETE CURB WHERE OCCURS. REFER TO ARCH. FOR LOCATIONS NOTE: FOR SLAB BUILD UP WITH CAPILLARY BREAK REFER TO FOUNDATION NOTE #2 (E) FOOTING TO REMAIN (E) SLAB ON GRADE (E) STUD WALL WHERE OCCURS 6" (N) SLAB ON GRADE #4 x 30" DOWEL @ 16" O.C. INSTALLED DRY 8" (E) SLAB ON GRADE (E) FOOTING TO REMAIN (N) POST PER SHEAR WALL SCHEDULE (N) SIMPSON HOLDOWN PER PLANS WITH HILTI HY-200 ADHESIVE ANCHOR RODS 5/8", 10" MIN EMBEDMENT [ESR-3187] EM B E D . 10 " M I N . SHEATHING PER PLAN SHEATHING PER PLANS SIMPSON A35 PER SHEAR WALL SCHEDULE E.N. B.N. 2X BLOCKING ROOF RAFTERS PER PLANS PER ARCH. FLASHING/GUTTER PER ARCH 2X FASCIA SIMPSON H2.5A EVERY THIRD RAFTER SHEATHING PER PLAN STRUCTURAL SHEATHING SIMPSON A35 PER SHEAR WALL SCHEDULE TYP. SHEAR WALL WHERE OCCURS E.N. B.N. 2X FLAT OUTRIGGERS @ 30" O.C. 2X FASCIA W/(2)16 d NAILS @EA. OUTRIGGER TRIM RAFTERS @OUTRIGERS 2X BLOCKING @ 48" O.C. ROOF SHEATHING PER PLANS ROOF RAFTERS PER PLANS (4) SDS25300 AT RAFTERS LAP 2X6 @ 16" O.C. JOISTS PER PLAN CEILING JOIST PER PLAN TYPBEARING WALL 2x BLOCKING (4) SDS25300 AT RAFTERS LAP 2X6 @ 16" O.C. JOISTS PER PLAN (N) SHEATHING PER PLAN (E) STRUCTURAL SHEATING (N) SIMPSON A35 PER SHEAR WALL SCHEDULE B.N. (E) CEILING JOIST PER PLANS (E) 2X BLOCKING V.I.F. (E) ROOF RAFTERS PER PLANS B.N. ROOF RAFTERS (OR DRAG STRUT) PER PLAN TYP SHEATHING PER PLANS (N) SIMPSON A35 PER SHEAR WALL SCHEDULE (E) STUD WALL SHEATHING PER PLAN 2x4 @ 16" O.C. CRIPPLE WALL STUDS 2X SILL PLATE W/ SDS SCREWS PER SHEAR WALL SCHEDULE (N) E.N. E.N. E.N. 3/4" = 1'-0" 18 (N) Shear Wall at (E) Footing 1" = 1'-0" 4 Typical Ridge/Hip Beam Detail 1" = 1'-0" 5 Typical Ridge Board Detail 1" = 1'-0" 7 Typ. California Franing 3/4" = 1'-0" 11 Typ. Non-Bearing Partition Wall Detail (On Cocrete Slab) 1" = 1'-0" 12 Typical Beam to Post Connection 1" = 1'-0" 1 Typical Shear Transfer at Wall 3/4" = 1'-0" 15 Typical Exterior Wall Footing Detail 3/4" = 1'-0" 19 New Slab to Existing Footing 3/4" = 1'-0" 16 (N) Holdown at (E) Footing 1" = 1'-0" 2 Typical Shear Transfer at Wall 1" = 1'-0" 3 Shear Transfer At Wall Detail 1" = 1'-0" 8 Open Ceiling Detail 1" = 1'-0" 9 Interior bearing wall detail 1" = 1'-0" 6 Shear Transfer Detail T- 2 4 ( 1 O F 2 ) G-100 N.T.S. AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.13 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D R E S T R I C T I O N S : THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPI ED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO C O M PL Y W I LL RESU LT I N I M M ED I AT E LEGAL ACTION TO COM PENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 ■■■ ■■■ ■■■■■■ ■■■■■■ ■■■■■■ ≥ ≥ ■■■■■■ ■■■■■■ ■■■■■■ ■■■■■■ ■■■■■■ STATE OF CAL IFORNIA ENERGY COMMISSION T- 2 4 ( 2 O F 2 ) G-200 N.T.S. AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.13 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D R E S T R I C T I O N S : THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPI ED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO C O M PL Y W I LL RESU LT I N I M M ED I AT E LEGAL ACTION TO COM PENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 CHAPTER 4 RESIDENTIAL MANDATORY MEASURES DIVISION 4.1 PLANNING AND DESIGN DIVISION 4.3 WATER EFFICIENCY AND CONSERVATION 4.406 ENHANCED DURABILITY AND REDUCED MAINTENANCE 4.406.1 RODENT PROOFING. Annular spaces around pipes, electric cables, conduits or other openings in sole/bottom plates at exterior walls shall be protected against the passage of rodents by closing such openings with cement mortar, concrete masonry or a similar method acceptable to the enforcing agency. 4.408 CONSTRUCTION WASTE REDUCTION, DISPOSAL AND RECYCLING 4.408.1 CONSTRUCTION WASTE MANAGEMENT. Recycle and/or salvage for reuse a minimum of 65 percent of the non-hazardous construction and demolition waste in accordance with either Section 4.408.2, 4.408.3 or 4.408.4, or meet a more stringent local construction and demolition waste management ordinance. Exceptions: 1. Excavated soil and land-clearing debris. 2. Alternate waste reduction methods developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist or are not located reasonably close to the jobsite. 3. The enforcing agency may make exceptions to the requirements of this section when isolated jobsites are located in areas beyond the haul boundaries of the diversion facility. 4.408.2 CONSTRUCTION WASTE MANAGEMENT PLAN. Submit a construction waste management plan in conformance with Items 1 through 5. The construction waste management plan shall be updated as necessary and shall be available during construction for examination by the enforcing agency. 1. Identify the construction and demolition waste materials to be diverted from disposal by recycling, reuse on the project or salvage for future use or sale. 2. Specify if construction and demolition waste materials will be sorted on-site (source separated) or bulk mixed (single stream). 3. Identify diversion facilities where the construction and demolition waste material collected will be taken. 4. Identify construction methods employed to reduce the amount of construction and demolition waste generated. 5. Specify that the amount of construction and demolition waste materials diverted shall be calculated by weight or volume, but not by both. 4.408.3 WASTE MANAGEMENT COMPANY. Utilize a waste management company, approved by the enforcing agency, which can provide verifiable documentation that the percentage of construction and demolition waste material diverted from the landfill complies with Section 4.408.1. Note: The owner or contractor may make the determination if the construction and demolition waste materials will be diverted by a waste management company. 4.408.4 WASTE STREAM REDUCTION ALTERNATIVE [LR]. Projects that generate a total combined weight of construction and demolition waste disposed of in landfills, which do not exceed 3.4 lbs./sq.ft. of the building area shall meet the minimum 65% construction waste reduction requirement in Section 4.408.1 4.408.4.1 WASTE STREAM REDUCTION ALTERNATIVE. Projects that generate a total combined weight of construction and demolition waste disposed of in landfills, which do not exceed 2 pounds per square foot of the building area, shall meet the minimum 65% construction waste reduction requirement in Section 4.408.1 4.408.5 DOCUMENTATION. Documentation shall be provided to the enforcing agency which demonstrates compliance with Section 4.408.2, items 1 through 5, Section 4.408.3 or Section 4.408.4.. Notes: 1. Sample forms found in "A Guide to the California Green Building Standards Code (Residential)" located at www.hcd.ca.gov/CALGreen.html may be used to assist in documenting compliance with this section. 2. Mixed construction and demolition debris (C & D) processors can be located at the California Department of Resources Recycling and Recovery (CalRecycle). 4.410 BUILDING MAINTENANCE AND OPERATION 4.410.1 OPERATION AND MAINTENANCE MANUAL. At the time of final inspection, a manual, compact disc, web-based reference or other media acceptable to the enforcing agency which includes all of the following shall be placed in the building: 1. Directions to the owner or occupant that the manual shall remain with the building throughout the life cycle of the structure. 2. Operation and maintenance instructions for the following: a. Equipment and appliances, including water-saving devices and systems, HVAC systems, photovoltaic systems, electric vehicle chargers, water-heating systems and other major appliances and equipment. b. Roof and yard drainage, including gutters and downspouts. c. Space conditioning systems, including condensers and air filters. d. Landscape irrigation systems. e. Water reuse systems. 3. Information from local utility, water and waste recovery providers on methods to further reduce resource consumption, including recycle programs and locations. 4. Public transportation and/or carpool options available in the area. 5. Educational material on the positive impacts of an interior relative humidity between 30-60 percent and what methods an occupant may use to maintain the relative humidity level in that range. 6. Information about water-conserving landscape and irrigation design and controllers which conserve water. 7. Instructions for maintaining gutters and downspouts and the importance of diverting water at least 5 feet away from the foundation. 8. Information on required routine maintenance measures, including, but not limited to, caulking, painting, grading around the building, etc. 9. Information about state solar energy and incentive programs available. 10. A copy of all special inspections verifications required by the enforcing agency or this code. 11. Information from the Department of Forestry and Fire Protection on maintenance of defensible space around residential structures. 12. Information and/or drawings identifying the location of grab bar reinforcements. 4.410.2 RECYCLING BY OCCUPANTS. Where 5 or more multifamily dwelling units are constructed on a building site, provide readily accessible area(s) that serves all buildings on the site and are identified for the depositing, storage and collection of non-hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waster, and metals, or meet a lawfully enacted local recycling ordinance, if more restrictive. Exception: Rural jurisdictions that meet and apply for the exemption in Public Resources Code Section 42649.82 (a)(2)(A) et seq. are note required to comply with the organic waste portion of this section. DIVISION 4.4 MATERIAL CONSERVATION AND RESOURCE EFFICIENCY DIVISION 4.5 ENVIRONMENTAL QUALITY 4.303 INDOOR WATER USE 4.303.1 WATER CONSERVING PLUMBING FIXTURES AND FITTINGS. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the sections 4.303.1.1, 4.303.1.2, 4.303.1.3, and 4.303.4.4. Note: All noncompliant plumbing fixtures in any residential real property shall be replaced with water-conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of a certificate of final completion, certificate of occupancy, or final permit approval by the local building department. See Civil Code Section 1101.1, et seq., for the definition of a noncompliant plumbing fixture, types of residential buildings affected and other important enactment dates. 4.303.1.1 Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush. Tank-type water closets shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for Tank-type Toilets. Note: The effective flush volume of dual flush toilets is defined as the composite, average flush volume of two reduced flushes and one full flush. 4.303.1.2 Urinals. The effective flush volume of wall mounted urinals shall not exceed 0.125 gallons per flush. The effective flush volume of all other urinals shall not exceed 0.5 gallons per flush. 4.303.1.3 Showerheads. 4.303.1.3.1 Single Showerhead. Showerheads shall have a maximum flow rate of not more than 1.8 gallons per minute at 80 psi. Showerheads shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for Showerheads. 4.303.1.3.2 Multiple showerheads serving one shower. When a shower is served by more than one showerhead, the combined flow rate of all the showerheads and/or other shower outlets controlled by a single valve shall not exceed 1.8 gallons per minute at 80 psi, or the shower shall be designed to only allow one shower outlet to be in operation at a time. Note: A hand-held shower shall be considered a showerhead. 4.303.1.4 Faucets. 4.303.1.4.1 Residential Lavatory Faucets. The maximum flow rate of residential lavatory faucets shall not exceed 1.2 gallons per minute at 60 psi. The minimum flow rate of residential lavatory faucets shall not be less than 0.8 gallons per minute at 20 psi. 4.303.1.4.2 Lavatory Faucets in Common and Public Use Areas. The maximum flow rate of lavatory faucets installed in common and public use areas (outside of dwellings or sleeping units) in residential buildings shall not exceed 0.5 gallons per minute at 60 psi. 4.303.1.4.3 Metering Faucets. Metering faucets when installed in residential buildings shall not deliver more than 0.2 gallons per cycle. 4.303.1.4.4 Kitchen Faucets. The maximum flow rate of kitchen faucets shall not exceed 1.8 gallons per minute at 60 psi. Kitchen faucets may temporarily increase the flow above the maximum rate, but not to exceed 2.2 gallons per minute at 60 psi, and must default to a maximum flow rate of 1.8 gallons per minute at 60 psi. Note: Where complying faucets are unavailable, aerators or other means may be used to achieve reduction. 4.303.1.4.5 Pre-rinse spray valves. When installed, shall meet the requirements in the California Code of Regulations, Title 20 (Appliance Efficiency Regulations), Sections 1605.1 (h)(4) Table H-2, Section 1605.3 (h)(4)(A), and Section 1607 (d)(7) and shall be equipped with an integral automatic shutoff. FOR REFERENCE ONLY: The following table and code section have been reprinted from the California Code of Regulations, Title 20 (Appliance Efficiency Regulations),Section 1605.1 (h)(4) and Section 1605.3 (h)(4)(A). Title 20 Section 1605.3 (h)(4)(A): Commercial prerinse spray values manufactured on or after January 1, 2006, shall have a minimum spray force of not less than 4.0 ounces-force (ozf)[113 grams-force(gf)] 4.303.2 Submeters for multifamily buildings and dwelling units in mixed-used residential/commercial buildings. Submeters shall be installed to measure water usage of individual rental dwelling units in accordance with the California Plumbing Code. 4.303.3 Standards for plumbing fixtures and fittings. Plumbing fixtures and fittings shall be installed in accordance with the California Plumbing Code, and shall meet the applicable standards referenced in Table 1701.1 of the California Plumbing Code. TABLE - MAXIMUM FIXTURE WATER USE FIXTURE TYPE FLOW RATE SHOWER HEADS (RESIDENTIAL)1.8 GMP @ 80 PSI LAVATORY FAUCETS (RESIDENTIAL)MAX. 1.2 GPM @ 60 PSI MIN. 0.8 GPM @ 20 PSI LAVATORY FAUCETS IN COMMON & PUBLIC USE AREAS 0.5 GPM @ 60 PSI KITCHEN FAUCETS 1.8 GPM @ 60 PSI METERING FAUCETS 0.2 GAL/CYCLE WATER CLOSET 1.28 GAL/FLUSH URINALS 0.125 GAL/FLUSH 4.304 OUTDOOR WATER USE 4.304.1 OUTDOOR POTABLE WATER USE IN LANDSCAPE AREAS. Residential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resources' Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent. NOTES: 1. The Model Water Efficient Landscape Ordinance (MWELO) is located in the California Code Regulations, Title 23, Chapter 2.7, Division 2. MWELO and supporting documents, including water budget calculator, are available at: https://www.water.ca.gov/ ABBREVIATION DEFINITIONS: HCD Department of Housing and Community Development BSC California Building Standards Commission DSA-SS Division of the State Architect, Structural Safety OSHPD Office of Statewide Health Planning and Development LR Low Rise HR High Rise AA Additions and Alterations N New NOTE: THIS TABLE COMPILES THE DATA IN SECTION 4.303.1, AND IS INCLUDED AS A CONVENIENCE FOR THE USER. SECTION 4.102 DEFINITIONS 4.102.1 DEFINITIONS The following terms are defined in Chapter 2 (and are included here for reference) FRENCH DRAIN. A trench, hole or other depressed area loosely filled with rock, gravel, fragments of brick or similar pervious material used to collect or channel drainage or runoff water. WATTLES. Wattles are used to reduce sediment in runoff. Wattles are often constructed of natural plant materials such as hay, straw or similar material shaped in the form of tubes and placed on a downflow slope. Wattles are also used for perimeter and inlet controls. 4.106 SITE DEVELOPMENT 4.106.1 GENERAL. Preservation and use of available natural resources shall be accomplished through evaluation and careful planning to minimize negative effects on the site and adjacent areas. Preservation of slopes, management of storm water drainage and erosion controls shall comply with this section. 4.106.2 STORM WATER DRAINAGE AND RETENTION DURING CONSTRUCTION. Projects which disturb less than one acre of soil and are not part of a larger common plan of development which in total disturbs one acre or more, shall manage storm water drainage during construction. In order to manage storm water drainage during construction, one or more of the following measures shall be implemented to prevent flooding of adjacent property, prevent erosion and retain soil runoff on the site. 1. Retention basins of sufficient size shall be utilized to retain storm water on the site. 2. Where storm water is conveyed to a public drainage system, collection point, gutter or similar disposal method, water shall be filtered by use of a barrier system, wattle or other method approved by the enforcing agency. 3. Compliance with a lawfully enacted storm water management ordinance. Note: Refer to the State Water Resources Control Board for projects which disturb one acre or more of soil, or are part of a larger common plan of development which in total disturbs one acre or more of soil. (Website: https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.html) 4.106.3 GRADING AND PAVING. Construction plans shall indicate how the site grading or drainage system will manage all surface water flows to keep water from entering buildings. Examples of methods to manage surface water include, but are not limited to, the following: 1. Swales 2. Water collection and disposal systems 3. French drains 4. Water retention gardens 5. Other water measures which keep surface water away from buildings and aid in groundwater recharge. Exception: Additions and alterations not altering the drainage path. 4.106.4 Electric vehicle (EV) charging for new construction. New construction shall comply with Sections 4.106.4.1 or 4.106.4.2 to facilitate future installation and use of EV chargers. Electric vehicle supply equipment (EVSE) shall be installed in accordance with the California Electrical Code, Article 625. Exceptions: 1. On a case-by-case basis, where the local enforcing agency has determined EV charging and infrastructure are not feasible based upon one or more of the following conditions: 1.1 Where there is no local utility power supply or the local utility is unable to supply adequate power. 1.2 Where there is evidence suitable to the local enforcing agency substantiating that additional local utility infrastructure design requirements, directly related to the implementation of Section 4.106.4, may adversely impact the construction cost of the project. 2. Accessory Dwelling Units (ADU) and Junior Accessory Dwelling Units (JADU) without additional parking facilities. 4.106.4.1 New one- and two-family dwellings and townhouses with attached private garages. For each dwelling unit, install a listed raceway to accommodate a dedicated 208/240-volt branch circuit. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or other enclosure in close proximity to the proposed location of an EV charger. Raceways are required to be continuous at enclosed, inaccessible or concealed areas and spaces. The service panel and/or subpanel shall provide capacity to install a 40-ampere 208/240-volt minimum dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overcurrent protective device. Exemption: A raceway is not required if a minimum 40-ampere 208/240-volt dedicated EV branch circuit is installed in close proximity to the proposed location of an EV charger at the time of original construction in accordance with the California Electrical Code. 4.106.4.1.1 Identification. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging as "EV CAPABLE". The raceway termination location shall be permanently and visibly marked as "EV CAPABLE". CHAPTER 3 GREEN BUILDING SECTION 301 GENERAL 301.1 SCOPE. Buildings shall be designed to include the green building measures specified as mandatory in the application checklists contained in this code. Voluntary green building measures are also included in the application checklists and may be included in the design and construction of structures covered by this code, but are not required unless adopted by a city, county, or city and county as specified in Section 101.7. 301.1.1 Additions and alterations. [HCD] The mandatory provisions of Chapter 4 shall be applied to additions or alterations of existing residential buildings where the addition or alteration increases the building's conditioned area, volume, or size. The requirements shall apply only to and/or within the specific area of the addition or alteration. The mandatory provision of Section 4.106.4.2 may apply to additions or alterations of existing parking facilities or the addition of new parking facilities serving existing multifamily buildings. See Section 4.106.4.3 for application. Note: Repairs including, but not limited to, resurfacing, restriping and repairing or maintaining existing lighting fixtures are not considered alterations for the purpose of this section. Note: On and after January 1, 2014, residential buildings undergoing permitted alterations, additions, or improvements shall replace noncompliant plumbing fixtures with water-conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of a certificate of final completion, certificate of occupancy or final permit approval by the local building department. See Civil Code Section 1101.1, et seq., for the definition of a noncompliant plumbing fixture, types of residential buildings affected and other important enactment dates. 301.2 LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS. [HCD] The provisions of individual sections of CALGreen may apply to either low-rise residential buildings high-rise residential buildings, or both. Individual sections will be designated by banners to indicate where the section applies specifically to low-rise only (LR) or high-rise only (HR). When the section applies to both low-rise and high-rise buildings, no banner will be used. SECTION 302 MIXED OCCUPANCY BUILDINGS 302.1 MIXED OCCUPANCY BUILDINGS. In mixed occupancy buildings, each portion of a building shall comply with the specific green building measures applicable to each specific occupancy. Exceptions: 1. [HCD] Accessory structures and accessory occupancies serving residential buildings shall comply with Chapter 4 and Appendix A4, as applicable. 2. [HCD] For purposes of CALGreen, live/work units, complying with Section 419 of the California Building Code, shall not be considered mixed occupancies. Live/Work units shall comply with Chapter 4 and Appendix A4, as applicable. 4.106.4.2 New multifamily dwellings, hotels and motels and new residential parking facilities. When parking is provided, parking spaces for new multifamily dwellings, hotels and motels shall meet the requirements of Sections 4.106.4.2.1 and 4.106.4.2.2. Calculations for spaces shall be rounded up to the nearest whole number. A parking space served by electric vehicle supply equipment or designed as a future EV charging space shall count as at least one standard automobile parking space only for the purpose of complying with any applicable minimum parking space requirements established by a local jurisdiction. See Vehicle Code Section 22511.2 for further details. 4.106.4.2.1Multifamily development projects with less than 20 dwelling units; and hotels and motels with less than 20 sleeping units or guest rooms. The number of dwelling units, sleeping units or guest rooms shall be based on all buildings on a project site subject to this section. 1.EV Capable. Ten (10) percent of the total number of parking spaces on a building site, provided for all types of parking facilities, shall be electric vehicle charging spaces (EV spaces) capable of supporting future Level 2 EVSE. Electrical load calculations shall demonstrate that the electrical panel service capacity and electrical system, including any on-site distribution transformer(s), have sufficient capacity to simultaneously charge all EVs at all required EV spaces at a minimum of 40 amperes. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as “EV CAPABLE” in accordance with the California Electrical Code. Exceptions: 1.When EV chargers (Level 2 EVSE) are installed in a number equal to or greater than the required number of EV capable spaces. 2.When EV chargers (Level 2 EVSE) are installed in a number less than the required number of EV capable spaces, the number of EV capable spaces required may be reduced by a number equal to the number of EV chargers installed. Notes: a.Construction documents are intended to demonstrate the project’s capability and capacity for facilitating future EV charging. b.There is no requirement for EV spaces to be constructed or available until receptacles for EV charging or EV chargers are installed for use. 2.EV Ready. Twenty-five (25) percent of the total number of parking spaces shall be equipped with low power Level 2 EV charging receptacles. For multifamily parking facilities, no more than one receptacle is required per dwelling unit when more than one parking space is provided for use by a single dwelling unit. Exception: Areas of parking facilities served by parking lifts. 4.106.4.2.2 Multifamily development projects with 20 or more dwelling units, hotels and motels with 20 or more sleeping units or guest rooms. The number of dwelling units, sleeping units or guest rooms shall be based on all buildings on a project site subject to this section. 1.EV Capable. Ten (10) percent of the total number of parking spaces on a building site, provided for all types of parking facilities, shall be electric vehicle charging spaces (EV spaces) capable of supporting future Level 2 EVSE. Electrical load calculations shall demonstrate that the electrical panel service capacity and electrical system, including any on-site distribution transformer(s), have sufficient capacity to simultaneously charge all EVs at all required EV spaces at a minimum of 40 amperes. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as “EV CAPABLE” in accordance with the California Electrical Code. Exception: When EV chargers (Level 2 EVSE) are installed in a number greater than five (5) percent of parking spaces required by Section 4.106.4.2.2, Item 3, the number of EV capable spaces required may be reduced by a number equal to the number of EV chargers installed over the five (5) percent required. Notes: a.Construction documents shall show locations of future EV spaces. b.There is no requirement for EV spaces to be constructed or available until receptacles for EV charging or EV chargers are installed for use. 2.EV Ready. Twenty-five (25) percent of the total number of parking spaces shall be equipped with low power Level 2 EV charging receptacles. For multifamily parking facilities, no more than one receptacle is required per dwelling unit when more than one parking space is provided for use by a single dwelling unit. Exception: Areas of parking facilities served by parking lifts. 3.EV Chargers. Five (5) percent of the total number of parking spaces shall be equipped with Level 2 EVSE. Where common use parking is provided, at least one EV charger shall be located in the common use parking area and shall be available for use by all residents or guests. When low power Level 2 EV charging receptacles or Level 2 EVSE are installed beyond the minimum required, an automatic load management system (ALMS) may be used to reduce the maximum required electrical capacity to each space served by the ALMS. The electrical system and any on-site distribution transformers shall have sufficient capacity to deliver at least 3.3 kW simultaneously to each EV charging station (EVCS) served by the ALMS. The branch circuit shall have a minimum capacity of 40 amperes, and installed EVSE shall have a capacity of not less than 30 amperes. ALMS shall not be used to reduce the minimum required electrical capacity to the required EV capable spaces. 4.106.4.2.2.1 Electric vehicle charging stations (EVCS). Electric vehicle charging stations required by Section 4.106.4.2.2, Item 3, shall comply with Section 4.106.4.2.2.1. Exception: Electric vehicle charging stations serving public accommodations, public housing, motels and hotels shall not be required to comply with this section. See California Building Code, Chapter 11B, for applicable requirements. 4.106.4.2.2.1.1 Location. EVCS shall comply with at least one of the following options: 1.The charging space shall be located adjacent to an accessible parking space meeting the requirements of the California Building Code, Chapter 11A, to allow use of the EV charger from the accessible parking space. 2.The charging space shall be located on an accessible route, as defined in the California Building Code, Chapter 2, to the building. Exception: Electric vehicle charging stations designed and constructed in compliance with the California Building Code, Chapter 11B, are not required to comply with Section 4.106.4.2.2.1.1 and Section 4.106.4.2.2.1.2, Item 3. 4.106.4.2.2.1.2 Electric vehicle charging stations (EVCS) dimensions. The charging spaces shall be designed to comply with the following: 1.The minimum length of each EV space shall be 18 feet (5486 mm). 2.The minimum width of each EV space shall be 9 feet (2743 mm). 3.One in every 25 charging spaces, but not less than one, shall also have an 8-foot (2438 mm) wide minimum aisle. A 5-foot (1524 mm) wide minimum aisle shall be permitted provided the minimum width of the EV space is 12 feet (3658 mm). a.Surface slope for this EV space and the aisle shall not exceed 1 unit vertical in 48 units horizontal (2.083 percent slope) in any direction. 4.106.4.2.2.1.3 Accessible EV spaces. In addition to the requirements in Sections 4.106.4.2.2.1.1 and 4.106.4.2.2.1.2, all EVSE, when installed, shall comply with the accessibility provisions for EV chargers in the California Building Code, Chapter 11B. EV ready spaces and EVCS in multifamily developments shall comply with California Building Code, Chapter 11A, Section 1109A. 4.106.4.2.3 EV space requirements. 1.Single EV space required. Install a listed raceway capable of accommodating a 208/240-volt dedicated branch circuit. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or enclosure in close proximity to the location or the proposed location of the EV space. Construction documents shall identify the raceway termination point, receptacle or charger location, as applicable. The service panel and/ or subpanel shall have a 40-ampere minimum dedicated branch circuit, including branch circuit overcurrent protective device installed, or space(s) reserved to permit installation of a branch circuit overcurrent protective device. Exception: A raceway is not required if a minimum 40-ampere 208/240-volt dedicated EV branch circuit is installed in close proximity to the location or the proposed location of the EV space, at the time of original construction in accordance with the California Electrical Code. 2.Multiple EV spaces required. Construction documents shall indicate the raceway termination point and the location of installed or future EV spaces, receptacles or EV chargers. Construction documents shall also provide information on amperage of installed or future receptacles or EVSE, raceway method(s), wiring schematics and electrical load calculations. Plan design shall be based upon a 40-ampere minimum branch circuit. Required raceways and related components that are planned to be installed underground, enclosed, inaccessible or in concealed areas and spaces shall be installed at the time of original construction. SECTION 4.501 GENERAL 4.501.1 Scope The provisions of this chapter shall outline means of reducing the quality of air contaminants that are odorous, irritating and/or harmful to the comfort and well being of a building's installers, occupants and neighbors. SECTION 4.502 DEFINITIONS 5.102.1 DEFINITIONS The following terms are defined in Chapter 2 (and are included here for reference) AGRIFIBER PRODUCTS. Agrifiber products include wheatboard, strawboard, panel substrates and door cores, not including furniture, fixtures and equipment (FF&E) not considered base building elements. COMPOSITE WOOD PRODUCTS. Composite wood products include hardwood plywood, particleboard and medium density fiberboard. "Composite wood products" does not include hardboard, structural plywood, structural panels, structural composite lumber, oriented strand board, glued laminated timber, prefabricated wood I-joists or finger-jointed lumber, all as specified in California Code of regulations (CCR), title 17, Section 93120.1. DIRECT-VENT APPLIANCE. A fuel-burning appliance with a sealed combustion system that draws all air for combustion from the outside atmosphere and discharges all flue gases to the outside atmosphere. DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE. Y N/AYN/AYN/AYN/A RESPON. PARTY RESPON. PARTY RESPON. PARTY RESPON. PARTY 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE RESIDENTIAL MANDATORY MEASURES, SHEET 1 (January 2023) Y = YES N/A =NOT APPLICABLE RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER, OWNER, CONTRACTOR, INSPECTOR ETC.) 4.201 GENERAL 4.201.1 SCOPE. For the purposes of mandatory energy efficiency standards in this code, the California Energy Commission will continue to adopt mandatory standards. DIVISION 4.2 ENERGY EFFICIENCY TABLE H-2 STANDARDS FOR COMMERCIAL PRE-RINSE SPRAY VALUES MANUFACTURED ON OR AFTER JANUARY 28, 2019 PRODUCT CLASS [spray force in ounce force (ozf)]MAXIMUM FLOW RATE (gpm) Product Class 1 (≤1.00 Product Class 2 (> 5.0 ozf and ≤1.20 Product Class 3 (> 8.0 ozf)1.28 Exception: A raceway is not required if a minimum 40-ampere 208/240-volt dedicated EV branch circuit is installed in close proximity to the location or the proposed location of the EV space at the time of original construction in accordance with the California Electrical Code. 4.106.4.2.4 Identification. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as “EV CAPABLE” in accordance with the California Electrical Code. 4.106.4.2.5 Electric Vehicle Ready Space Signage. Electric vehicle ready spaces shall be identified by signage or pavement markings, in compliance with Caltrans Traffic Operations Policy Directive 13-01 (Zero Emission Vehicle Signs and Pavement Markings) or its successor(s). 4.106.4.3 Electric vehicle charging for additions and alterations of parking facilities serving existing multifamily buildings. When new parking facilities are added, or electrical systems or lighting of existing parking facilities are added or altered and the work requires a building permit, ten (10) percent of the total number of parking spaces added or altered shall be electric vehicle charging spaces (EV spaces) capable of supporting future Level 2 EVSE. Notes: 1.Construction documents are intended to demonstrate the project’s capability and capacity for facilitating future EV charging. 2.There is no requirement for EV spaces to be constructed or available until EV chargers are installed for use. AIA CALIFORNIA GR E E N B U I L D I N G F O R M S G-300 N.T.S. AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.13 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D R E S T R I C T I O N S : THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPI ED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO C O M PL Y W I LL RESU LT I N I M M ED I AT E LEGAL ACTION TO COM PENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 MAXIMUM INCREMENTAL REACTIVITY (MIR). The maximum change in weight of ozone formed by adding a compound to the "Base Reactive Organic Gas (ROG) Mixture" per weight of compound added, expressed to hundredths of a gram (g O³/g ROC). Note: MIR values for individual compounds and hydrocarbon solvents are specified in CCR, Title 17, Sections 94700 and 94701. MOISTURE CONTENT. The weight of the water in wood expressed in percentage of the weight of the oven-dry wood. PRODUCT-WEIGHTED MIR (PWMIR). The sum of all weighted-MIR for all ingredients in a product subject to this article. The PWMIR is the total product reactivity expressed to hundredths of a gram of ozone formed per gram of product (excluding container and packaging). Note: PWMIR is calculated according to equations found in CCR, Title 17, Section 94521 (a). REACTIVE ORGANIC COMPOUND (ROC). Any compound that has the potential, once emitted, to contribute to ozone formation in the troposphere. VOC. A volatile organic compound (VOC) broadly defined as a chemical compound based on carbon chains or rings with vapor pressures greater than 0.1 millimeters of mercury at room temperature. These compounds typically contain hydrogen and may contain oxygen, nitrogen and other elements. See CCR Title 17, Section 94508(a). 4.503 FIREPLACES 4.503.1 GENERAL. Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with U.S. EPA New Source Performance Standards (NSPS) emission limits as applicable, and shall have a permanent label indicating they are certified to meet the emission limits. Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances. 4.504 POLLUTANT CONTROL 4.504.1 COVERING OF DUCT OPENINGS & PROTECTION OF MECHANICAL EQUIPMENT DURING CONSTRUCTION. At the time of rough installation, during storage on the construction site and until final startup of the heating, cooling and ventilating equipment, all duct and other related air distribution component openings shall be covered with tape, plastic, sheet metal or other methods acceptable to the enforcing agency to reduce the amount of water, dust or debris which may enter the system. 4.504.2 FINISH MATERIAL POLLUTANT CONTROL. Finish materials shall comply with this section. 4.504.2.1 Adhesives, Sealants and Caulks. Adhesives, sealant and caulks used on the project shall meet the requirements of the following standards unless more stringent local or regional air pollution or air quality management district rules apply: 1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 VOC limits, as shown in Table 4.504.1 or 4.504.2, as applicable. Such products also shall comply with the Rule 1168 prohibition on the use of certain toxic compounds (chloroform, ethylene dichloride, methylene chloride, perchloroethylene and tricloroethylene), except for aerosol products, as specified in Subsection 2 below. 2. Aerosol adhesives, and smaller unit sizes of adhesives, and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than 1 pound and do not consist of more than 16 fluid ounces) shall comply with statewide VOC standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with section 94507. 4.504.2.2 Paints and Coatings. Architectural paints and coatings shall comply with VOC limits in Table 1 of the ARB Architectural Suggested Control Measure, as shown in Table 4.504.3, unless more stringent local limits apply. The VOC content limit for coatings that do not meet the definitions for the specialty coatings categories listed in Table 4.504.3 shall be determined by classifying the coating as a Flat, Nonflat or Nonflat-High Gloss coating, based on its gloss, as defined in subsections 4.21, 4.36, and 4.37 of the 2007 California Air Resources Board, Suggested Control Measure, and the corresponding Flat, Nonflat or Nonflat-High Gloss VOC limit in Table 4.504.3 shall apply. 4.504.2.3 Aerosol Paints and Coatings. Aerosol paints and coatings shall meet the Product-weighted MIR Limits for ROC in Section 94522(a)(2) and other requirements, including prohibitions on use of certain toxic compounds and ozone depleting substances, in Sections 94522(e)(1) and (f)(1) of California Code of Regulations, Title 17, commencing with Section 94520; and in areas under the jurisdiction of the Bay Area Air Quality Management District additionally comply with the percent VOC by weight of product limits of Regulation 8, Rule 49. 4.504.2.4 Verification. Verification of compliance with this section shall be provided at the request of the enforcing agency. Documentation may include, but is not limited to, the following: 1. Manufacturer's product specification. 2. Field verification of on-site product containers. CHAPTER 7 INSTALLER & SPECIAL INSPECTOR QUALIFICATIONS 702 QUALIFICATIONS 702.1 INSTALLER TRAINING. HVAC system installers shall be trained and certified in the proper installation of HVAC systems including ducts and equipment by a nationally or regionally recognized training or certification program. Uncertified persons may perform HVAC installations when under the direct supervision and responsibility of a person trained and certified to install HVAC systems or contractor licensed to install HVAC systems. Examples of acceptable HVAC training and certification programs include but are not limited to the following: 1. State certified apprenticeship programs. 2. Public utility training programs. 3. Training programs sponsored by trade, labor or statewide energy consulting or verification organizations. 4. Programs sponsored by manufacturing organizations. 5. Other programs acceptable to the enforcing agency. 702.2 SPECIAL INSPECTION [HCD]. When required by the enforcing agency, the owner or the responsible entity acting as the owner's agent shall employ one or more special inspectors to provide inspection or other duties necessary to substantiate compliance with this code. Special inspectors shall demonstrate competence to the satisfaction of the enforcing agency for the particular type of inspection or task to be performed. In addition to other certifications or qualifications acceptable to the enforcing agency, the following certifications or education may be considered by the enforcing agency when evaluating the qualifications of a special inspector: 1. Certification by a national or regional green building program or standard publisher. 2. Certification by a statewide energy consulting or verification organization, such as HERS raters, building performance contractors, and home energy auditors. 3. Successful completion of a third party apprentice training program in the appropriate trade. 4. Other programs acceptable to the enforcing agency. Notes: 1. Special inspectors shall be independent entities with no financial interest in the materials or the project they are inspecting for compliance with this code. 2. HERS raters are special inspectors certified by the California Energy Commission (CEC) to rate homes in California according to the Home Energy Rating System (HERS). [BSC] When required by the enforcing agency, the owner or the responsible entity acting as the owner's agent shall employ one or more special inspectors to provide inspection or other duties necessary to substantiate compliance with this code. Special inspectors shall demonstrate competence to the satisfaction of the enforcing agency for the particular type of inspection or task to be performed. In addition, the special inspector shall have a certification from a recognized state, national or international association, as determined by the local agency. The area of certification shall be closely related to the primary job function, as determined by the local agency. Note: Special inspectors shall be independent entities with no financial interest in the materials or the project they are inspecting for compliance with this code. 703 VERIFICATIONS 703.1 DOCUMENTATION. Documentation used to show compliance with this code shall include but is not limited to, construction documents, plans, specifications, builder or installer certification, inspection reports, or other methods acceptable to the enforcing agency which demonstrate substantial conformance. When specific documentation or special inspection is necessary to verify compliance, that method of compliance will be specified in the appropriate section or identified applicable checklist. 4.505 INTERIOR MOISTURE CONTROL 4.505.1 General. Buildings shall meet or exceed the provisions of the California Building Standards Code. 4.505.2 CONCRETE SLAB FOUNDATIONS. Concrete slab foundations required to have a vapor retarder by California Building Code, Chapter 19, or concrete slab-on-ground floors required to have a vapor retarder by the California Residential Code, Chapter 5, shall also comply with this section. 4.505.2.1 Capillary break. A capillary break shall be installed in compliance with at least one of the following: 1. A 4-inch (101.6 mm) thick base of 1/2 inch (12.7mm) or larger clean aggregate shall be provided with a vapor barrier in direct contact with concrete and a concrete mix design, which will address bleeding, shrinkage, and curling, shall be used. For additional information, see American Concrete Institute, ACI 302.2R-06. 2. Other equivalent methods approved by the enforcing agency. 3. A slab design specified by a licensed design professional. 4.505.3 MOISTURE CONTENT OF BUILDING MATERIALS. Building materials with visible signs of water damage shall not be installed. Wall and floor framing shall not be enclosed when the framing members exceed 19 percent moisture content. Moisture content shall be verified in compliance with the following: 1. Moisture content shall be determined with either a probe-type or contact-type moisture meter.Equivalent moisture verification methods may be approved by the enforcing agency and shall satisfy requirements found in Section 101.8 of this code. 2. Moisture readings shall be taken at a point 2 feet (610 mm) to 4 feet (1219 mm) from the grade stamped end of each piece verified. 3. At least three random moisture readings shall be performed on wall and floor framing with documentation acceptable to the enforcing agency provided at the time of approval to enclose the wall and floor framing. Insulation products which are visibly wet or have a high moisture content shall be replaced or allowed to dry prior to enclosure in wall or floor cavities. Wet-applied insulation products shall follow the manufacturers' drying recommendations prior to enclosure. 4.506 INDOOR AIR QUALITY AND EXHAUST 4.506.1 Bathroom exhaust fans. Each bathroom shall be mechanically ventilated and shall comply with the following: 1. Fans shall be ENERGY STAR compliant and be ducted to terminate outside the building. 2. Unless functioning as a component of a whole house ventilation system, fans must be controlled by a humidity control. a. Humidity controls shall be capable of adjustment between a relative humidity range less than or equal to 50% to a maximum of 80%. A humidity control may utilize manual or automatic means of adjustment. b. A humidity control may be a separate component to the exhaust fan and is not required to be integral (i.e., built-in) Notes: 1. For the purposes of this section, a bathroom is a room which contains a bathtub, shower or tub/shower combination. 2. Lighting integral to bathroom exhaust fans shall comply with the California Energy Code. 4.507 ENVIRONMENTAL COMFORT 4.507.2 HEATING AND AIR-CONDITIONING SYSTEM DESIGN. Heating and air conditioning systems shall be sized, designed and have their equipment selected using the following methods: 1. The heat loss and heat gain is established according to ANSI/ACCA 2 Manual J - 2011 (Residential Load Calculation), ASHRAE handbooks or other equivalent design software or methods. 2. Duct systems are sized according to ANSI/ACCA 1 Manual D - 2014 (Residential Duct Systems), ASHRAE handbooks or other equivalent design software or methods. 3. Select heating and cooling equipment according to ANSI/ACCA 3 Manual S - 2014 (Residential Equipment Selection), or other equivalent design software or methods. Exception: Use of alternate design temperatures necessary to ensure the system functions are acceptable. TABLE 4.504.1 - ADHESIVE VOC LIMIT1,2 (Less Water and Less Exempt Compounds in Grams per Liter) ARCHITECTURAL APPLICATIONS VOC LIMIT INDOOR CARPET ADHESIVES 50 CARPET PAD ADHESIVES 50 OUTDOOR CARPET ADHESIVES 150 WOOD FLOORING ADHESIVES 100 RUBBER FLOOR ADHESIVES 60 SUBFLOOR ADHESIVES 50 CERAMIC TILE ADHESIVES 65 VCT & ASPHALT TILE ADHESIVES 50 DRYWALL & PANEL ADHESIVES 50 COVE BASE ADHESIVES 50 MULTIPURPOSE CONSTRUCTION ADHESIVE 70 STRUCTURAL GLAZING ADHESIVES 100 SINGLE-PLY ROOF MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC WELDING 510 CPVC WELDING 490 ABS WELDING 325 PLASTIC CEMENT WELDING 250 ADHESIVE PRIMER FOR PLASTIC 550 CONTACT ADHESIVE 80 SPECIAL PURPOSE CONTACT ADHESIVE 250 STRUCTURAL WOOD MEMBER ADHESIVE 140 TOP & TRIM ADHESIVE 250 SUBSTRATE SPECIFIC APPLICATIONS METAL TO METAL 30 PLASTIC FOAMS 50 POROUS MATERIAL (EXCEPT WOOD)50 WOOD 30 FIBERGLASS 80 1. IF AN ADHESIVE IS USED TO BOND DISSIMILAR SUBSTRATES TOGETHER, THE ADHESIVE WITH THE HIGHEST VOC CONTENT SHALL BE ALLOWED. 2. FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC CONTENT SPECIFIED IN THIS TABLE, SEE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1168. TABLE 4.504.2 - SEALANT VOC LIMIT (Less Water and Less Exempt Compounds in Grams per Liter) SEALANTS VOC LIMIT ARCHITECTURAL 250 MARINE DECK 760 NONMEMBRANE ROOF 300 ROADWAY 250 SINGLE-PLY ROOF MEMBRANE 450 OTHER 420 SEALANT PRIMERS ARCHITECTURAL NON-POROUS 250 POROUS 775 MODIFIED BITUMINOUS 500 MARINE DECK 760 OTHER 750 TABLE 4.504.5 - FORMALDEHYDE LIMITS1 MAXIMUM FORMALDEHYDE EMISSIONS IN PARTS PER MILLION PRODUCT CURRENT LIMIT HARDWOOD PLYWOOD VENEER CORE 0.05 HARDWOOD PLYWOOD COMPOSITE CORE 0.05 PARTICLE BOARD 0.09 MEDIUM DENSITY FIBERBOARD 0.11 THIN MEDIUM DENSITY FIBERBOARD2 0.13 1. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIF. AIR RESOURCES BOARD, AIR TOXICS CONTROL MEASURE FOR COMPOSITE WOOD AS TESTED IN ACCORDANCE WITH ASTM E 1333. FOR ADDITIONAL INFORMATION, SEE CALIF. CODE OF REGULATIONS, TITLE 17, SECTIONS 93120 THROUGH 93120.12. 2. THIN MEDIUM DENSITY FIBERBOARD HAS A MAXIMUM THICKNESS OF 5/16" (8 MM). TABLE 4.504.3 - VOC CONTENT LIMITS FOR ARCHITECTURAL COATINGS2,3 GRAMS OF VOC PER LITER OF COATING, LESS WATER & LESS EXEMPT COMPOUNDS COATING CATEGORY VOC LIMIT FLAT COATINGS 50 NON-FLAT COATINGS 100 NONFLAT-HIGH GLOSS COATINGS 150 SPECIALTY COATINGS ALUMINUM ROOF COATINGS 400 BASEMENT SPECIALTY COATINGS 400 BITUMINOUS ROOF COATINGS 50 BITUMINOUS ROOF PRIMERS 350 BOND BREAKERS 350 CONCRETE CURING COMPOUNDS 350 CONCRETE/MASONRY SEALERS 100 DRIVEWAY SEALERS 50 DRY FOG COATINGS 150 FAUX FINISHING COATINGS 350 FIRE RESISTIVE COATINGS 350 FLOOR COATINGS 100 FORM-RELEASE COMPOUNDS 250 GRAPHIC ARTS COATINGS (SIGN PAINTS)500 HIGH TEMPERATURE COATINGS 420 INDUSTRIAL MAINTENANCE COATINGS 250 LOW SOLIDS COATINGS1 120 MAGNESITE CEMENT COATINGS 450 MASTIC TEXTURE COATINGS 100 METALLIC PIGMENTED COATINGS 500 MULTICOLOR COATINGS 250 PRETREATMENT WASH PRIMERS 420 PRIMERS, SEALERS, & UNDERCOATERS 100 REACTIVE PENETRATING SEALERS 350 RECYCLED COATINGS 250 ROOF COATINGS 50 RUST PREVENTATIVE COATINGS 250 SHELLACS CLEAR 730 OPAQUE 550 SPECIALTY PRIMERS, SEALERS & UNDERCOATERS 100 STAINS 250 STONE CONSOLIDANTS 450 SWIMMING POOL COATINGS 340 TRAFFIC MARKING COATINGS 100 TUB & TILE REFINISH COATINGS 420 WATERPROOFING MEMBRANES 250 WOOD COATINGS 275 WOOD PRESERVATIVES 350 ZINC-RICH PRIMERS 340 1. GRAMS OF VOC PER LITER OF COATING, INCLUDING WATER & EXEMPT COMPOUNDS 2. THE SPECIFIED LIMITS REMAIN IN EFFECT UNLESS REVISED LIMITS ARE LISTED IN SUBSEQUENT COLUMNS IN THE TABLE. 3. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA AIR RESOURCES BOARD, ARCHITECTURAL COATINGS SUGGESTED CONTROL MEASURE, FEB. 1, 2008. MORE INFORMATION IS AVAILABLE FROM THE AIR RESOURCES BOARD. DIVISION 4.5 ENVIRONMENTAL QUALITY (continued) 4.504.3 CARPET SYSTEMS. All carpet installed in the building interior shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.3.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.3.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 4.504.1. 4.504.4 RESILIENT FLOORING SYSTEMS. Where resilient flooring is installed , at least 80% of floor area receiving resilient flooring shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. hhtps://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.5 COMPOSITE WOOD PRODUCTS. Hardwood plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the buildings shall meet the requirements for formaldehyde as specified in ARB's Air Toxics Control Measure for Composite Wood (17 CCR 93120 et seq.), by or before the dates specified in those sections, as shown in Table 4.504.5 4.504.5.1 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: 1. Product certifications and specifications. 2. Chain of custody certifications. 3. Product labeled and invoiced as meeting the Composite Wood Products regulation (see CCR, Title 17, Section 93120, et seq.). 4. Exterior grade products marked as meeting the PS-1 or PS-2 standards of the Engineered Wood Association, the Australian AS/NZS 2269, European 636 3S standards, and Canadian CSA 0121, CSA 0151, CSA 0153 and CSA 0325 standards. 5. Other methods acceptable to the enforcing agency. DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE. Y N/AYN/AYN/AYN/A RESPON. PARTY RESPON. PARTY RESPON. PARTY RESPON. PARTY 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE RESIDENTIAL MANDATORY MEASURES, SHEET 2 (January 2023) Y = YES N/A =NOT APPLICABLE RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER, OWNER, CONTRACTOR, INSPECTOR ETC.) AIA CALIFORNIA GR E E N B U I L D I N G F O R M S G-400 N.T.S. AT T A C H E D A D U AD U 90 7 D I A N N E S T U n i t # 2 SF D 90 7 D I A N N E S T . SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.13 DATE: 1.17.2024 SCALE: JOB ID: DIANNE T E R M S O F U S E A N D R E S T R I C T I O N S : THESE PLANS ARE THE INTELLECTUAL P R O P E R T Y O F V A L L E C I O S D E S I G N STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH T H E S E P L A N S W E R E P R E P A R E D . FURTHERMORE, THESE DRAWINGS MAY NOT BE COPI ED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, W I T H O U T W R I T T E N C O N S E N T O F V A L L E C I O S D E S I G N S T U D I O . A C K N O W L E D G E M E N T W I T H T H E S E R E S T R I C T I O N S A R E A S S U M E D W I T H THE USE OF THESE PLANS. FAILURE TO C O M PL Y W I LL RESU LT I N I M M ED I AT E LEGAL ACTION TO COM PENSATE EACH P R O H I B I T E D U S E O F T H E S E P L A N S . 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M D I G I T A L L Y S I G N E D O N 1 2 . 1 2 . 2 0 2 4 SAA STRUCTURAL ENGINEERING, INC. ADDRESS: 23901 CALABASAS ROAD, SUITE 1023, CALABASAS, CA 91302 PH: 323-448-4682 WEB: SAAENG.COM STRUCTURAL CALCULATIONS FOR ATTACHED ADU AT 907 DIANNE ST, SANTA ANA, CA 92701 08/19/2024 SAA STRUCTURAL ENGINEERING, INC. ADDRESS: 23901 CALABASAS ROAD, SUITE 1023, CALABASAS, CA 91302 PH: 323-448-4682 WEB: SAAENG.COM Table of Content Gravity Design Lateral Force Design Supplemental Materials 907 Dianne St, Santa Ana, CA 92701 Page: Unit Weights Date: By: NS Roof (Open Ceiling) Roofing per arch 3 psf Plywood 1,5 psf Roof rafters 2,2 psf Insulation R30 1,2 psf 1/2" Gyp Ceiling 2,2 psf Misc (w/Solar) 2,9 psf Total DL:13,0 psf Roof LL:20,0 psf Ceiling Ceiling Joists 2,2 psf Insulation R30 1,2 psf 1/2" Gyp Ceiling 2,2 psf Misc 0,4 psf Total DL:6,0 psf Ceiling LL:10,0 psf Exterior Walls Stucco Finish 9 psf Plywood 1,5 psf 2x6 @ 16" O.C.1,7 psf Insulation R13 2,2 psf Gypsum board 1/2"2,2 psf Misc.0,4 psf Total DL:17,0 psf Interior Walls Gypsum board 1/2"2,2 psf 2x4 @ 16" O.C.1,1 psf Gypsum board 1/2"2,2 psf Misc.1,5 psf Total DL:7,0 psf PAGE 3 907 Dianne St, Santa Ana, CA 92701 Page: Roof Key Map Date: By: NS CJ - 1 RR - 1 HDR-1 TYP. RB-1 CJ - 1 RR - 1 RIDGE BOARD (E) RR (E) CJ (E ) R I D G E (E ) R R (E) HDR PAGE 4 907 Dianne St, Santa Ana, CA 92701 Page: Gravity Design Date: By: NS PAGE 5 PAGE 6 907 Dianne St, Santa Ana, CA 92701 Page: Base Shear (Wood shear walls R = 6.5) Date: By: NS Ss =1,295 S1 =0,462 Site Class =D Occupancy Category =I or II (Table 1-1) R =6,5 (Table 12.2-1) hn =10,75 ft, height above base (§12.8.2.1) Lateral System =(Table 12.8-2) Importance Factor =1 (Table 11.5-1) Fa =1,200 (Table 11.4-1) ASCE 7-16 Fv =1,838 (Table 11.4-2) ASCE 7-16 SMS =1,554 FaSS, (11.4-1) SM1 =0,849 FvS1, (11.4-2) SDS =1,036 2/3 SMS, (11.4-3) SD1 = 0,566 2/3 SM1, (11.4-4) T0 =0,109 0.2 SD1 / SDS TS =0,546 SD1 / SDS TL =8 (Table 22-16) Seismic Design Category =D (Table 11.6-1) Ta =0,119 Ct hn x, (12.8-7) Increase For Eq.12.8-3 and 12.8-4 1,00 T < 1.5Ts, No Increase For Site Class D per 11.8.2 Exception 2 Cs =0,159 SDS / (R/I), (12.8-2) Csmax =0,733 SD1 / [T(R/I) ] for T < T L , (12.8-3) Csmax =49,42 SD1 TL/ [T2(R/I) ] for T > T L , (12.8-4) Csmin =0,01 (12.8-5) Csmin =0,04 0.5 S1 / (R/I) for S 1 ≥ 0.6g, (12.8-6) V =0,159 Cs W, (12.8-1) r =1,3 redundancy factor per §12.3.4.2 r V =0,207 W All other structural systems PAGE 7 907 Dianne St, Santa Ana, CA 92701 Page: Seismic Mass Date: One Storey Section By: NS Level 1 Storey Height (ft)8 Roof/Ceiling Roof DL (psf) 13 Area (ft2)422,0 Mass (lbs) 5486 Ceiling (psf) 6 Area (ft2)220,0 Mass (lbs) 1320 Exterior Walls (psf) 17 Length (ft) 58,2 Mass (lbs) 3958 Interior Walls (psf) 7 Length (ft) 40 Mass (lbs) 1120 Total (lbs) 11884 Shear (0,207W)2462,3 lbs or 5,8 psf PAGE 8 907 Dianne St, Santa Ana, CA 92701 Page: Roof Level Shear Wall Layout Date: By: NS W-1 W-3 W-4 W-2 PAGE 9 907 Dianne St, Santa Ana, CA 92701 Page: Roof Level Shear Wall Layout Date: By: NS Roof Shear (psf) = 5,8 SDS =1,036 Equations Force Diagram E = Trib. Area · Base Shear (psf) VASD =0.7·E/L w = wall self weight+roof/ceiling OTM = E·H RM =w·L2/2 T/C =[0.7·OTM - (0.6-0.14·SDS)RM] / [L-0.5ft] Shear Wall Summary Trib (ft2)E (lbs) H (ft) L (ft)VASD (plf)w (plf) OTM (lb-ft) RM (lb-ft) T/C (lbs) Wall Tag HDU Tag W-1 211 1224 8 8 107 208 9790 6640 511 Δ1 HDU2 W-2 211 1224 8 8 107 208 9790 6640 511 Δ1 HDU2 W-3 865 5017 8 16 219 150 40136 19200 1249 Δ1 HDU2 W-4 211 1224 8 7 122 162 9790 3969 777 Δ1 HDU2 Holdown Values Shear Wall Values Tag ASD (lbs) ID ASD (plf) A HDU2 3075 Δ1 310 B HDU4 4565 Δ2 510 PAGE 10 Wood Beam LIC# : KW-06015220, Build:20.24.08.01 SAA Structural Engineering (c) ENERCALC INC 1983-2023 DESCRIPTION:CJ-1 SAA Structural Engineering www.saaeng.com P: 323-448-4682 Project File: 907 Dianne St.ec6 CODE REFERENCES Calculations per NDS 2018, IBC 2021, ASCE 7-16 Load Combination Set : IBC 2021 Material Properties Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase Allowable Stress Design Douglas Fir-Larch No.2 900.0 900.0 1,350.0 625.0 1,600.0 580.0 180.0 575.0 31.210 Analysis Method : Eminbend - xx ksi Wood Species : Wood Grade : Fb + psi psi Fv psi Fb - Ft psi Fc - Prll psi psiFc - Perp E : Modulus of Elasticity Ebend- xx ksi Density pcf Load Combination :IBC 2021 .Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.0060, Lr = 0.010 ksf, Tributary Width = 1.330 ft, (Ceiling) .DESIGN SUMMARY Design OK Maximum Bending Stress Ratio 0.141: 1 Load Combination +D+Lr Span # where maximum occurs Span # 1 Location of maximum on span 3.750 ft 12.81 psi= = 1,681.88 psi 2x6Section used for this span Span # where maximum occurs Location of maximum on span Span # 1= Load Combination +D+Lr = = = 225.00 psi== Section used for this span 2x6 Maximum Shear Stress Ratio 0.057 : 1 7.062 ft= = 237.42 psi Maximum Deflection 3144 <360 1965 Ratio =0 <180 Max Downward Transient Deflection 0.029 in 0 Ratio =>=360 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.046 in Ratio =>=180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v Span: 1 : Lr Only n/a Span: 1 : +D+Lr n/a .Maximum Forces & Stresses for Load Combinations Span # Moment ValuesLoad Combination C iCLx CCCMCF rt Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu D Only 0.0 0.00 0.00.0 1.00Length = 7.50 ft 1 0.074 0.030 0.90 1.300 1.151.00 1.00 0.06 89.0 1,211.0 0.03 162.01.00 4.81.00 1.00+D+Lr 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 7.50 ft 1 0.141 0.057 1.25 1.300 1.151.00 1.00 0.15 237.4 1,681.9 0.07 225.01.00 12.81.00 1.00+D+0.750Lr 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 7.50 ft 1 0.119 0.048 1.25 1.300 1.151.00 1.00 0.13 200.3 1,681.9 0.06 225.01.00 10.81.00 1.00+0.60D 1.300 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 7.50 ft 1 0.025 0.010 1.60 1.300 1.151.00 1.00 0.03 53.4 2,152.8 0.02 288.01.00 2.91.00 . PAGE 11 Wood Beam LIC# : KW-06015220, Build:20.24.08.01 SAA Structural Engineering (c) ENERCALC INC 1983-2023 DESCRIPTION:RR-1 SAA Structural Engineering www.saaeng.com P: 323-448-4682 Project File: 907 Dianne St.ec6 CODE REFERENCES Calculations per NDS 2018, IBC 2021, ASCE 7-16 Load Combination Set : IBC 2021 Material Properties Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase Allowable Stress Design Douglas Fir-Larch No.2 900.0 900.0 1,350.0 625.0 1,600.0 580.0 180.0 575.0 31.210 Analysis Method : Eminbend - xx ksi Wood Species : Wood Grade : Fb + psi psi Fv psi Fb - Ft psi Fc - Prll psi psiFc - Perp E : Modulus of Elasticity Ebend- xx ksi Density pcf Load Combination :IBC 2021 .Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.0130, Lr = 0.020 ksf, Tributary Width = 1.330 ft, (Roof) Point Load : D = 0.030, Lr = 0.050 k @ 2.750 ft, (CJ-1) .DESIGN SUMMARY Design OK Maximum Bending Stress Ratio 0.423: 1 Load Combination +D+Lr Span # where maximum occurs Span # 1 Location of maximum on span 4.790 ft 36.45 psi= = 1,552.50 psi 2x8Section used for this span Span # where maximum occurs Location of maximum on span Span # 1= Load Combination +D+Lr = = = 225.00 psi== Section used for this span 2x8 Maximum Shear Stress Ratio 0.162 : 1 0.000 ft= = 657.37 psi Maximum Deflection 1088 <360 663 Ratio =0 <180 Max Downward Transient Deflection 0.116 in 0 Ratio =>=360 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.190 in Ratio =>=180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v Span: 1 : Lr Only n/a Span: 1 : +D+Lr n/a .Maximum Forces & Stresses for Load Combinations Span # Moment ValuesLoad Combination C iCLx CCCMCF rt Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu D Only 0.0 0.00 0.00.0 1.00Length = 10.50 ft 1 0.230 0.088 0.90 1.200 1.151.00 1.00 0.28 256.9 1,117.8 0.10 162.01.00 14.21.00 1.00+D+Lr 1.200 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 10.50 ft 1 0.423 0.162 1.25 1.200 1.151.00 1.00 0.72 657.4 1,552.5 0.26 225.01.00 36.41.00 1.00+D+0.750Lr 1.200 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 10.50 ft 1 0.359 0.137 1.25 1.200 1.151.00 1.00 0.61 557.3 1,552.5 0.22 225.01.00 30.91.00 1.00+0.60D 1.200 1.151.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 10.50 ft 1 0.078 0.030 1.60 1.200 1.151.00 1.00 0.17 154.1 1,987.2 0.06 288.01.00 8.51.00 . PAGE 12 Wood Beam LIC# : KW-06015220, Build:20.24.08.01 SAA Structural Engineering (c) ENERCALC INC 1983-2023 DESCRIPTION:RB-1 SAA Structural Engineering www.saaeng.com P: 323-448-4682 Project File: 907 Dianne St.ec6 CODE REFERENCES Calculations per NDS 2018, IBC 2021, ASCE 7-16 Load Combination Set : IBC 2021 Material Properties Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Allowable Stress Design Douglas Fir-Larch No.1 1,350.0 1,350.0 925.0 625.0 1,600.0 580.0 170.0 675.0 31.210 Analysis Method : Eminbend - xx ksi Wood Species : Wood Grade : Fb + psi psi Fv psi Fb - Ft psi Fc - Prll psi psiFc - Perp E : Modulus of Elasticity Ebend- xx ksi Density pcf Load Combination :IBC 2021 .Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loading Uniform Load : D = 0.0130, Lr = 0.020 ksf, Tributary Width = 10.50 ft, (Roof) .DESIGN SUMMARY Design OK Maximum Bending Stress Ratio 0.763: 1 Load Combination +D+Lr Span # where maximum occurs Span # 1 Location of maximum on span 8.500 ft 64.66 psi= = 1,687.50 psi 6x12Section used for this span Span # where maximum occurs Location of maximum on span Span # 1= Load Combination +D+Lr = = = 212.50 psi== Section used for this span 6x12 Maximum Shear Stress Ratio 0.304 : 1 0.000 ft= = 1,288.06 psi Maximum Deflection 573 <360 334 Ratio =0 <180 Max Downward Transient Deflection 0.356 in 0 Ratio =>=360 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.610 in Ratio =>=180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v Span: 1 : Lr Only n/a Span: 1 : +D+Lr n/a .Maximum Forces & Stresses for Load Combinations Span # Moment ValuesLoad Combination C iCLx CCCMCF rt Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu D Only 0.0 0.00 0.00.0 1.00Length = 17.0 ft 1 0.442 0.176 0.90 1.000 1.001.00 1.00 5.43 537.1 1,215.0 1.14 153.01.00 27.01.00 1.00+D+Lr 1.000 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 17.0 ft 1 0.763 0.304 1.25 1.000 1.001.00 1.00 13.01 1,288.1 1,687.5 2.73 212.51.00 64.71.00 1.00+D+0.750Lr 1.000 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 17.0 ft 1 0.652 0.260 1.25 1.000 1.001.00 1.00 11.12 1,100.3 1,687.5 2.33 212.51.00 55.21.00 1.00+0.60D 1.000 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 17.0 ft 1 0.149 0.059 1.60 1.000 1.001.00 1.00 3.26 322.3 2,160.0 0.68 272.01.00 16.21.00 . PAGE 13 Wood Beam LIC# : KW-06015220, Build:20.24.08.01 SAA Structural Engineering (c) ENERCALC INC 1983-2023 DESCRIPTION:HDR-1 SAA Structural Engineering www.saaeng.com P: 323-448-4682 Project File: 907 Dianne St.ec6 CODE REFERENCES Calculations per NDS 2018, IBC 2021, ASCE 7-16 Load Combination Set : IBC 2021 Material Properties Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Allowable Stress Design Douglas Fir-Larch No.1 1350 1350 925 625 1600 580 170 675 31.21 Analysis Method : Eminbend - xx ksi Wood Species : Wood Grade : Fb + psi psi Fv psi Fb - Ft psi Fc - Prll psi psiFc - Perp E : Modulus of Elasticity Ebend- xx ksi Density pcf Load Combination :IBC 2021 .Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loading Uniform Load : D = 0.0130, Lr = 0.020 ksf, Tributary Width = 6.0 ft, (Roof) .DESIGN SUMMARY Design OK Maximum Bending Stress Ratio 0.080: 1 Load Combination +D+Lr Span # where maximum occurs Span # 1 Location of maximum on span 1.600 ft 18.03 psi= = 2,193.75 psi 4x6Section used for this span Span # where maximum occurs Location of maximum on span Span # 1= Load Combination +D+Lr = = = 212.50 psi== Section used for this span 4x6 Maximum Shear Stress Ratio 0.085 : 1 2.745 ft= = 175.98 psi Maximum Deflection 10469 <360 6214 Ratio =0 <180 Max Downward Transient Deflection 0.004 in 0 Ratio =>=360 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.006 in Ratio =>=180 Max Upward Total Deflection 0 in fb: Actual F'b fv: Actual F'v Span: 1 : Lr Only n/a Span: 1 : +D+Lr n/a .Maximum Forces & Stresses for Load Combinations Span # Moment ValuesLoad Combination C iCLx CCCMCF rt Shear ValuesMax Stress Ratios M CDV fbM fvF'b V F'vSegment Length Cfu D Only 0.0 0.00 0.00.0 1.00Length = 3.20 ft 1 0.045 0.048 0.90 1.300 1.001.00 1.00 0.11 71.5 1,579.5 0.09 153.01.00 7.31.00 1.00+D+Lr 1.300 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 3.20 ft 1 0.080 0.085 1.25 1.300 1.001.00 1.00 0.26 176.0 2,193.8 0.23 212.51.00 18.01.00 1.00+D+0.750Lr 1.300 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 3.20 ft 1 0.068 0.072 1.25 1.300 1.001.00 1.00 0.22 149.9 2,193.8 0.20 212.51.00 15.41.00 1.00+0.60D 1.300 1.001.00 1.00 0.0 0.00 0.01.00 0.01.00 1.00Length = 3.20 ft 1 0.015 0.016 1.60 1.300 1.001.00 1.00 0.06 42.9 2,808.0 0.06 272.01.00 4.41.00 . PAGE 14 SANTA ANA CITY COUNCIL Mayor vamezcua@santa-ana.org Mayor Pro Tem, Ward 1 tphan@santa-ana.org Ward 2 bvazquez@santa-ana.org Ward 3 jessielopez@santa-ana.org Ward 4 pbacerra@santa-ana.org Ward 5 jryanhernandez@santa-ana.org MAYOR Valerie Amezcua MAYOR PRO TEM Thai Viet Phan COUNCILMEMBERS Phil Bacerra Johnathan Ryan Hernandez Jessie Lopez David Penaloza Benjamin Vazquez CITY OF SANTA ANA PLANNING AND BUILDING AGENCY 20 Civic Center Plaza ● P.O. Box 1988 Santa Ana, California 92702 www.santa-ana.org ACTING CITY MANAGER Alvaro Nuñez CITY ATTORNEY Sonia R. Carvalho CITY CLERK Jennifer L. Hall July 15, 2024 Also sent via email to: swanclan1744@gmail.com Michael Theodore Gozos Suatengco 907 N Dianne Street Santa Ana, CA. 92701 Subject: Address Assignment for a new Accessory Dwelling Unit located at 907 North Dianne Street and (APN: 400-164-08) in Santa Ana, CA Dear Michael, The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal addressing within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment for a new Accessory Dwelling Unit located at 907 North Dianne Street and (APN: 400-164-08). Notice is hereby given that the following assigned address(es) shall be posted onsite per the approved address plan, attached hereto as Exhibit A. Address(es) to be Activated/Posted 907 To subdivide commercial and/or residential units into multiple units, a building permit (and all other associated permits), plans, and inspection approvals by the PBA are required. Address(es) will be verified during inspections by the Building Safety Division. Please update your records accordingly. Should you have any questions, feel free to contact me by phone at (714) 667-2709 or by email at ASevilla@santa-ana.org. Sincerely, Alexis Sevilla Planning Technician Jerry Guevara, AICP, Senior Planner Address Letter for 907 N. Dianne Street Page 2 of 2 Exhibit A – Address Plan c: Vencent Quaglia, United States Post Office Chris Tuiolosega, United States Post Office Cipriano Corona, Marketing Manager, United States Post Office Alex Alvarez, Postmaster Santa Ana, United States Post Office Federal Express, Administration Cathy Joseph, Garden Grove Unified School District Christine Hy, Garden Grove Unified School District Cathy Slader, Orange Unified School District Orin Williams, Santa Ana Unified School District Yvette Miranda, Santa Ana Unified School District Cristina Bernal, Tustin Unified School District Orange County Fire Authority Neal Kelly, Registrar of Voters Members, Board of Supervisors Southern California Gas Company Southern California Edison Company Claude Parrish, County Assessor's Office SAG, AT&T UPS, Administration City Manager’s Office Beverly Martin, Police Community Services Specialist Boris Duran, Police Systems Manager Jennifer Mendoza, Police Communications Manager Chris Hubbard, Police Systems Support Analyst Alejandra Gutierrez, Treasury & Customer Services Manager Hector Jimenez, Revenue Supervisor Alfonso Chavez, Utilities Customer Services Supervisor Judson Brown, Housing & Neighborhood Development Manager Rudy Rosas, Principal Civil Engineer Zdenek (Zed) Kekula, Principal Civil Engineer Jason Kwak, Building Safety Manager Evelyn LaRocca, Permit Supervisor Kathy Hernandez, Permit Technician Julie Amsden, Permit Technician Ali Pezeshkpour, Planning Manager Jerry Guevara, Senior Planner Yvette Portugal, Code Enforcement Principal Sergio Verino, Code Enforcement Principal DI A N N E S T 57 ' - 2 " 5' - 4 " 24'-5"28'-2"36'-6" 12 ' - 0 " 20 ' - 1 1 " 29 ' - 3 " 7' - 0 " 5' - 0 " 3' - 2 " SI T E P L A N A-100 1/8" = 1'-0" AT T A C H E D A D U 90 7 D I A N N E S T SA N T A A N A , C A 9 2 7 0 1 AP N : 4 0 0 - 1 6 4 - 0 8 SHEET NUMBER: CL I E N T R E V I E W S E T DB: W.V.FILE VER: 1.00 DATE: 1.17.2024 SCALE: JOB ID: DIANNE TERMS OF USE AND RESTRICTIONS: THESE PLANS ARE THE INTELLECTUAL PROPERTY OF VALLECIOS DESIGN STUDIO AND MUST BE USED ONLY FOR THE ADDRESS AND CLIENT FOR WHICH THESE P LANS WERE PREP ARED. FURTHERMORE, THESE DRAWINGS MAY NOT BE COPIED, TRACED, OR SHARED IN ANY FORM, IN PART OR AS A WHOLE, WITHOUT WRITTEN CONSENT OF V A L L E C I O S D E S I G N S T U D I O . ACKNOWLEDGEMENT WITH THESE RESTRICTIONS ARE ASSUMED WITH THE USE OF THESE PLANS. FAILURE TO COMPLY WILL RESULT IN IMMEDIATE LEGAL ACTION TO COMPENSATE EACH PROHIBITED USE OF THESE PLANS. 81 8 . 5 5 4 . 8 8 3 1 v a l l e c i o s @ g m a i l . c o m DE S I G N S T U D I O - P R O J E C T M A N A G E M E N T REVISIONS:BY: W W W . V A L L E C I O S . C O M SHEET INDEX DESIGN - PRIMARY CONTACT VALLECIOS - DESIGN | PROJECT MANAGEMENT 818.554.8831 VALLECIOS@GMAIL.COM OWNER MICHAEL AND VAN SUATENGCO PROJECT CONTACTS SCOPE OF WORK SITE INFORMATION THIS PROJECT IS TO BE IN COMPLIANCE WITH: 2022 CALIFORNIA RESIDENTIAL BUILDING CODE 2022 CALIFORNIA GREEN CODE 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA PLUMBING CODE COMPLIANCE VICINITY MAP APN: 400-164-08SANTA ANA, CA 92071907 DIANNE ST NEW 351 SQ.FT. ATTACHED ACCESSORY DWELLING UNIT (ADU) AT REAR OF EXISTING SINGLE FAMILY DWELLING. A-100 SITE PLAN G-003 GREEN BUILDING FORMS G-004 GREEN BUILDING FORMS G-001 T-24 (1 OF 2) G-002 T-24 (2 OF 2) A-200 EXISTING FLOOR PLAN & DEMO PLAN A-201 PROPOSED FLOOR PLAN A-210 ELEVATIONS A-230 ROOF PLAN A-240 ELECTRICAL LAYOUT PLAN PROPERTY PROFILE CONSTRUCTION TYPE: V-B BUILDING HEIGHT: FIRE SPRINKLERS:NO OCCUPANCY:R-3, U ASSESSMENT NO.400-164-08 LOT NUMBER20 LEGAL START DATE10/16/1956 LOT TYPELOT DOC. NO.MM 109/1-2 MAP NO.TR 2109 DOC. REF. NO.200800496277 DOC. REF. DATE LEGAL DESCR.N-TRACT:2109 BLOCK: LOT: 20 SITE ADRESS907 DIANNE ST LANDUSE163 AREA SQFT6000 PERIM. FT 313 CITY/STATESANTA ANA ZIPCODE92701 JOBSITE N EXHIBIT A - ADDRESS PLAN (N) 907 N DIANNE ST UNIT 2 (E) 907 N DIANNE ST O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Submittal Criteria Form Required for Single Family or Duplex Residences (Use Commercial form for lots with 3+ dwelling units or new residential tracts) Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification. Project Information  New Single Family Residence/Duplex  Addition/Remodel  ADU  Other Address: Unit #: City or Unincorporated County Area: ZIP: Scope of Work: Existing Area: Area to be Added: Total Resulting Area: Stories: Area Added in Past 2 Years (excluding this project): Yes No Questionnaire OCFA Plan Type if “Yes” 1.   New – Is this a new single family residence or duplex? *(PR160) Residential Site with Water Availability (PR400-402) Fire Sprinkler 2.   ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has fire sprinklers or a house that will have fire sprinklers added as part of this project? (PR400-402) Fire Sprinkler 3.   Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire sprinkler retrofit based on a threshold set by local ordinance? (PR400-402) Fire Sprinkler 4.   Distance – Is the most remote portion of the addition, ADU or other detached structure greater than 140-feet from the fire access roadway? *(PR160) Residential Site 5.   Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non- sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet? *(PR160) Residential Site with Water Availability 6.   Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed contractor to determine if a fire sprinkler modification is needed. (PR400-402) Fire Sprinkler 7.   Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold set by local ordinance? *(PR160) Residential Site (PR400-402) Fire Sprinkler 8.   Gate – Is a gate being installed across a driveway or road that is designated as a fire department access roadway, or a driveway or road that serves more than a single home/duplex? (PR180) Gate 9.   Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000 sf, and ADU’s). *(PR160) Residential Site *(PR172-174) Methane Test/Mitigation Plans 10.   Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation, or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as defined by the State, or (D) near an area that could be affected by a wildfire in the open space. *(PR125) Fuel Modification (PR182) Accessory Structure *OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals. Applicant Certification I certify, under penalty of perjury, under the laws of the State of California, that the information above is true: Print Name:_______________________________________ Signature:___________________________________________ Date:______________ Phone Number:_____________________________________________ Email:_____________________________________________________________ Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required. ______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes” and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination. For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100 SFR asn⊥ -斗u!d tuco!lddv -凡t!u ㌣⊃  旬皿oo/旬!○ - @l叩1h : lIO!tnq叩S!a ●○○廿捌SS量JO apG叩uO Su耶POped lSe)ord Jfep (06)んouqu叩宰u耶u‥印t叩q叩SV ‘000 S叩JO coUt3nSS一叩OI JOlrd旬od u旧O 9lO叫M U' 9叩S剛treTqt如d J叩e甲`u!e.roll p9)郎St; S! PeSOdLu! Se導叩JO "mOu服}叩`相t3uO胴PV.O乙O99 tropeS OPO〇匹田山9^OD Ul囲甲SeP S叩ue田e…b9=叩O血叩O 9Ⅲe皿QJJed JO S9ey叩JO叩eu高ed 9押印l爪S99ue聞uI∞ ‡o飢叩旬p=臥叩JO 9eJ巾us O叩き鴨e」 u! PO!」9d rs卸ord A叩(06)毎ulu叩呼叩nOA 9SiAPt2 O1 9^」eS =叩S 9〇I)ON S叩`eJQ押印ユ’Saeユ叩 JO叩nOtHe叩(乙) pue se拍9S叩JO uO里sod甲e両Selord o) PO田9dんep (06)心ou!U叩JO `Gseeのsuopex9 J叩O JO SeQ=OO甲S JO lu弧A雨JO eu甲9叩叩くJu坤Iddv 冒星図:p印〇〇丁○○0 1unOuV丁り○○星団匝:●ON斗〇〇叫O印可:置eqⅢnN ldや〇eせ ●9^Oqe p9朗〇〇ds sno/S)〇〇 〇叩J鴎(S)叩Ⅲed 8u馴nq B JO 9〇uenSSl叩O) 91-Smb9J9」d B Se lu坤丁ddv o) P9nSS! S! DOO S'甲田Pu叫H∽一丁ddv叩布p印9Send uo甲田QJ甲叩O) 8岬JO〇〇e PeuTuL剛eP S弧岬甲 `1unOⅧe PeU'aeds-eAOqt!叩P岬d se印uco'ldd∀叩印t S9明り〇〇句9」eq (くく1飢J)SIG,,) qu堅G IOO巾S P叩lun uysn⊥ e皿:NOI⊥VOIⅢ⊥湘○ ⊥OIせ⊥SIa |OOHOS 1tう)0⊥ qnS  ̄ ̄万 ̄$ 丁均0↓ qnS (甘bs oo∬p〇〇〇Xe) suo晒PV Ⅲ○○を音□ 句量’bs囲○○ こ●尊’bs」ede9霞       X :e3Bds岬!」)§nPuI Put! 1や賀euuOO JO leOH aJtmbs JO 」equInN ’郵且’bs岬1○○ $ =虻’bs」ed〇〇且       X uo岬叫SuOO M9N □ :eor!ds I叩ueP!SeurO lee岬t,nbsJO」@叩nN  ̄ ̄」壬弓 ̄ ̄ e軸9重電nbs阿 丁 ̄砺 ̄ ̄ (S)剛胆9p-S9せ :・ON ’q甘O/●引田8v (∂uO )l3e叫O) 口調/“叩8v Ⅱ0噂里関口 :霊u叫OIIOH a ) l叫@3u叩⊥09●V u! PeUS!)us ue∂q @^叩)3efo」d qu JqI S叩e 乙丁e^e「 丁丁e^e置 !nbeH事叩l§!Ⅱ漢OO叫3S 置叩O JO甲1S!q ∂叩布〇叩OuJO S庇p (OC)佃晒叩卑しp孤0 叩uo p叩J S叩叩S!a叩`0OO S叩JO a。umSST叩8u棚adx3 … PUt? 1u捌丁ddv句pep!ÅO」d s‘unO肌2軸pQI e」孤bs叩8両町e^相u9Pued9Pu- JO ne!l uI ‘0OO 血叩9u朋O S叩uco!lddv 」9即u!eJeq Peq甲S9P耶叩〕 J9pe∂廊eq o”叩S!a 9叩句p9u皿e,9P S叩e叫d叩JO 90両s peso-Ou9 Put3 Pen〇人OO 9Tqe∂釦叩叩u! eS捌〇u! ut? JO na血BJO 3急叩QJ針mbs 91qeSS3SSt判=O (“ncI,,) sl甲8uT漢1孤PJO Jeqmu叩u! 9Se○」Ou! uB S事的叩J草nP S}unOun叩uO里PP諒ue /ed put3 DOO PePueurB 耽u朋O丁印S Put! OI S9∂J畠叩e叫d叩JO (Sい9皿O ]O岬o!lddv (S) put言UOT’onJ}SuO〇 PeqLl〇SeP u!e」91l e印可即田ed Su剛nq t} enSS冊用e即ueu叩ed9P 8叩里nq叩 布Peul甲田919P 9⊥弧伽l9q uO-peln〇1∽ eey叩tIT P3Sn S叩nOu印OQJ 9Je両s叩(ty) f由S丁9^OqB PeP!^O」d uo叩皿QJu朝} `98p叩o呵S・叩OI-dd∀叩JO ’Seq叩Ol (C) :(“0OO,,) cou理dunoo JO e)瑚甲○○ ST叩JO eOumSS=QJ Sl鵬甲p O} 9e」88 ・(S)JeunO甲nS句`o岬Z叩叩2 ST P耽(“}O〇foJd・,) 1○○中d pe3u9JapJ-e^Oq叩} JO (S)則nO 叩JO Jl叩q UO 8u叩s! 」O (S)則nO叩S∥u坤Iddv (乙声佃甲9 S甲叩OやT丁ddr"'L11 Pt,㊤」 Se叫uco!lddv (【) :的nO〇 Pue ap S! 8u叩ollQJ叩1叩`t棚馴わ JO SMel叩」9Pmんn申dJO相oued J9Pun `se坤p9P Put2 S‡u9SeJd∂J佃19q (くくJurollddv,,) uo叩」叩9P S叩8u岬O9Xe llOS」9d et肛WOHy2rV7つ且aLN犀つで7蘭rV :(S)J9qⅢnN丁〇〇職d 阿れN9uO叫d ̄ ̄ 」扱Zケ友ノ多l偽印j管  ̄∴初〃〃 ON}Ⅲed∴ : S1○○/事〇電工⊥ :S§e賀ppV事3可0賀d :SS9」ppV 8u川ゼ困 :J9u仏0/叩坤1ddv事〇〇「OJd TOCL-OCL (ウ暮L) - 08LZ6 VO `u!事SnL `tee叫S 3 u叩OS OOC -器NⅡMユHVdHa SⅡOIÅHⅡS SSⅡNISn糧 .b∂S J∂ `s66S9 uO!事○○S 9PO0 1ueⅢu」∂^O9 Put2 0Z9LI uO丁t3@S ∂POO uO!叩3nPⅡ (“0OO,,) sⅡⅡⅡ rIOOHOS HÅILVNHⅡ⊥rI∇ aNV AHOLnLVユS DNIaHVDⅡH HONVrIdMOO HO H器VOIHI器HⅡ○ ユO暮せLSIa rIOOHOS aHIHINn NILSnユ