Loading...
HomeMy WebLinkAboutCITY PROJECT - 1821 & 1823 E Chestnut Ave - PlanLOC PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE APPROVALS NABIL SABA, PE, EXECUTIVE DIRECTOR PUBLIC WORKS AGENCY RODOLFO ROSAS, PE, DEPUTY PUBLIC WORKS DIRECTOR/CITY ENGINEER PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE DATE DATE 3/28/2025 6:04:02 PM 2308 G0.1 SANTA ANA ZOO EDUCATION HUB PLAN CHECK SUBMITTAL 02 MARCH 28, 2025 COVER SHEET MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 MARCH 28, 2025 25 1821 & 1823 E. CHESTNUT AVE, SANTA ANA, CA 92701 PROJECT NO. 23-2601: FA-07170 GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE "STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION" AS WRITTEN AND PROMULGATED BY THE 2018 EDITION OF SOUTHERN CALIFORNIA CHAPTER OF THE A.P.W.A. A.G.C.C. JOINT COOPERATIVE COMMITTEE HEREIN REFERRED TO AS THE STANDARD SPECIFICATIONS OF THE CITY OF SANTA ANA STANDARD PLANS & SPECIFICATIONS (UNLESS SPECIFICALLY NOTED OTHERWISE OR IN THE SPECIAL PROVISIONS FOR THIS PROJECT). 2. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY OR STRUCTURE SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. NO CERTIFICATION IS MADE AS TO ACCURACY OR THOROUGHNESS OF THESE RECORDS. APPROVAL OF THIS PLAN BY THE CITY OF SANTA ANA DOES NOT CONSTITUTE AN EXISTENCE OR NONEXISTENCE OF ANY UNDERGROUND UTILITY OR SUBSTRUCTURE WITHIN THE LIMITS OF THIS PROJECT. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES (BY POTHOLING OR OTHER MEANS). THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (811) 48 HOURS BEFORE ANY EXCAVATION. No.Description Date 1 DRC SUBMITTAL 02 11/21/24 Bldg #'s 101121878-79 Elect #'s 20184680-81 Plumb #'s 30148144-45 Mech #'s 40139793-94 APPROVALS: PLNG - F. Arias BLDG - CSG POLICE - B. Martin PUBLIC WORKS - Y. Soto ELECT/MECH/PLUMB - CSG LOC PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" SHEET INDEXVICINITY MAP PROJECT SCOPE OF WORK PROJECT DATA PROPERTY DESCRIPTION PROJECT NAME: ADDRESS: LEGAL DESCRIPTION: APN: ZONING INFORMATION LOT SIZE: ZONE: LAND USE DESIGNATION: MAXIMUM HEIGHT: MAXIMUM FAR: SETBACKS REQUIRED: PARKING EXISTING PROVIDED EV PARKING BUILDING AND SAFETY INFORMATION: OCCUPANCY: AREA EXISTING: AREA PROPOSED: NO. OF STORIES: BUILDING HEIGHT: BUILDING CONSTRUCTION: FIRE SPRINKLERS, EXISTING: FIRE SPRINKERS, PROPOSED: SEPARATIONS REQUIRED: YARD REQUIREMENTS: FEMA DESIGNATED FLOOD ZONE: APPLICABLE CODES & STANDARDS PROJECT DIRECTORY DEFERRED APPROVALS CLIENT:ARCHITECT: CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 7/ 3 1 / 2 0 2 5 3 : 0 5 : 3 7 P M 2308 G0.2 SANTA ANA ZOO LOC ARCHITECTS KPFF STRUCTURAL ENGINEER KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com SHEET INDEX AND PROJECT DATA JULY 17TH, 2025 BID ADDENDUM 01 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB JULY 17TH, 2025 25 SANTA ANA ZOO EDUCATION HUB 1821 & 1823 E. CHESTNUT AVE. SANTA ANA, CA 92701 TR 24 LOT 4 ALL -EX FREEWAY- STAFFORD & TUSTIN TR LOT A ELY 379 FT -EX FREEWAY& ST- 402-212-01, 402-212-02, 402-221-01 791,000 SF (18 AC+/-) O OS, OPEN SPACE N/A N/A N/A ZOO PARKING EXISTING (189 PARKING SPACES + 6 HANDICAPPED SPACES) TO REMAIN FUTURE PROJECT BY SANTA ANA PUBLIC WORKS BUILDING A: A-3 ; BUILDING B: B/S-1 N/A BUILDING A: 3,328 SF ; BUILDING B: 7,084 SF. TOTAL SF: 10,412 SF BUILDING A: 1 ; BUILDING B: 2 BUILDING A: 21'-1 1/2" ; BUILDING B: 30'-8 1/2" TYPE V-B N/A FULLY SPRINKLERED NFPA 13 NONE NONE ZONE X (MINIMAL FLOOD HAZARD) THE APPLICABLE CODES & STANDARDS FOR THE PROJECT INCLUDE: •2022 CALIFORNIA BUILDING CODE (CBC) •2022 CALIFORNIA MECHANICAL CODE (CMC) •2022 CALIFORNIA ELECTRICAL CODE (CEC) •2022 CALIFORNIA PLUMBING CODE (CPC) •2022 CALIFORNIA FIRE CODE (CFC) •2022 CALIFORNIA ENERGY CODE (CEC) •2022 CALIFORNIA GREEN CODE (CGC) •2022 CALIFORNIA GREEN STANDARDS CODE (CALGREEN) •TITLE 24 REFERENCED STANDARDS APPLICABLE TO THE PROJECT INCLUDE: •NFPA 10 PORTABLE FIRE EXTINGUISHERS (2021 EDITION) •NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS (2022 EDITION) •NFPA 72 NATIONAL FIRE ALARM CODE (2022 EDITION) THE AUTHORITIES HAVING JURISDICTION INCLUDE THE FOLLOWING: •SANTA ANA MUNICIPAL CODE •ORANGE COUNTY FIRE AUTHORITY THE FOLLOWING SYSTEMS WILL BE PROVIDED AS REQUIRED BY THE APPLICABLE CODES AND LIFE SAFETY STRATEGY: •PORTABLE FIRE EXTINGUISHERS (INSTALLED AS PER NFPA 10) •AUTOMATIC SPRINKLER SYSTEM SUPERVISED BY THE FIRE ALARM SYSTEM (INSTALLED AS PER NFPA 13) •FIRE ALARM SYSTEM WITH VOICE AND VISIBLE NOTIFICATION (INSTALLED AS PER NFPA 72) DEMOLITION SCOPE: • DEMOLITION OF PORTION OF EXISTING BRICK WALKWAYS • DEMOLITION OF PORTION OF EXISTING PATH • DEMOLITION OF EXISTING CHAIN LINK FENCE • DEMOLITION OF UNDERGROUND TELEPHONE LINE • DEMOLITION OF EXISTING PLANTER FIRE SPRINKLERS FIRE ALARM BUILDING SIGNAGE PV SYSTEM NEW SCOPE: • NEW TWO 2 STORY TYPE V-B BUILDING CONTAINING NEW WALLS, FLOORS, ROOF, AND CEILINGS. • ADDITION OF LANDSCAPE CONCRETE PATHWAYS, PLANTING, BENCHES, AND EXTERIOR LIGHTING • NEW SEWER CONNECTION, DOMESTIC WATER AND ELECTRICAL LINES • NEW CONCRETE COLUMNS, BEAMS, AND SLAB • NEW STEEL AND WOOD COLUMNS, BEAMS, AND STRUCTURE • NEW MECHANICAL UNITS, DUCTS, SUPPLY, AND RETURNS. • NEW PLUMBING FIXTURES AND PIPING • NEW ELECTRICAL OUTLETS AND LIGHTING FIXTURES • NEW ELEVATOR AND STAIRCASES • NEW FIXED FURNISHINGS AND MILLWORK SHEET #SHEET NAME 05 / 0 6 / 2 4 P R I C I N G P A C K A G E 08 / 1 4 / 2 4 D R C P C 0 1 11 / 2 1 / 2 0 2 4 D R C S U B M I T T A L 0 2 11 / 2 6 / 2 0 2 4 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 1 28 / 0 3 / 2 0 2 5 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 2 28 / 0 3 / 2 0 2 5 B I D S E T 08 / 0 5 / 2 0 2 5 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 3 29 / 0 5 / 2 5 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 4 12 / 0 6 / 2 5 B I D A D D E N D U M 0 1 GENERAL G0.1 COVER SHEET • • • • • • • • • G0.2 SHEET INDEX AND PROJECT DATA • • • • • • • • • G0.3 GENERAL NOTES • • • • • • • • G0.4.1 CODE ANALYSIS • • • • • • • • G0.4.2 CODE ANALYSIS • • • • • G0.5.1 ADA DETAILS • • • • • • • • G0.5.2 ADA SIGNAGE DETAILS • • • • • • • • G0.5.3 MOUNTING HEIGHTS AND REACH RANGES • • • • • • • • G0.6 TYP CEILING DETAILS • • • • • • • • G0.7.1 GREEN CODE COMPLIANCE • • • • • • • • G0.7.2 GREEN CODE COMPLIANCE • • • • • • • • G0.7.3 GREEN CODE COMPLIANCE • • • • • • • • G0.8.1 BLDG A TITLE 24 REPORT • • • • • • • G0.8.2 BLDG A TITLE 24 REPORT • • • • • • • G0.8.3 BLDG A TITLE 24 REPORT • • • • • • • G0.8.4 BLDG B TITLE 24 REPORT • • • • • • • G0.8.5 BLDG B TITLE 24 REPORT • • • • • • • G0.8.6 BLDG B TITLE 24 REPORT • • • • • • • CIVIL C0.01 TITLE SHEET • • • • • • • • C1.00 SURVEY • • • • • • • • C1.10 EROSION CONTROL PLAN • • • • • • • • C1.11 EROSION CONTROL PLAN • • • • • • • • C1.20 DEMOLITION PLAN-PHASE 1 • • • • • • • • C1.21 DEMOLITION PLAN-PHASE 2 • • • • • • • • C1.30 GRADING PLAN-PHASE 1 • • • • • • • • C1.31 PAVING PLAN-PHASE 1 • • • • • • • • C1.32 ROUGH GRADING PLAN-PHASE 1 • • • • • • C1.33 GRADING PLAN SECTIONS • • • • C1.34 GRADING PLAN-PHASE 2 • • • • C1.35 PAVING PLAN-PHASE 2 • • • • C1.36 ROUGH GRADING PLAN-PHASE 2 • • • • C1.40 UTILITY PLAN- PHASE 1 • • • • • • • • C1.41 UTILITY PLAN-PHASE 1 • • • • • • • • C1.42 UTILITY PLAN-PHASE 2 • • • • C5.00 CIVIL DETAILS • • • • • • • • C5.01 CIVIL DETAILS- WATER AND SEWER • • • • • • • • C5.02 CIVIL DETAILS- STORM DRAIN • • • • • • • • LANDSCAPE L0.01 TITLE SHEET • • • • • • • L0.02 PHASING PLAN • • • • L1.01 LANDSCAPE LAYOUT AND MATERIALS PLAN • • • • • • • L2.01 SITE DETAILS • • • • • • • L2.02 SITE DETAILS • • • • • • • L2.03 SITE DETAILS • • • • • • • L2.04 SITE DETAILS • • • • • • • L3.00A IRRIGATION LEGEND AND NOTES • • • • • • • L3.00B IRRIGATION WATER USE DATA • • • • • • • L3.00C IRRIGATION SPECIFICATIONS • • • • • • • L3.01 IRRIGATION PLAN • • • • • • • L3.02 IRRIGATION PLAN • • • • • • • L3.20 IRRIGATION DETAILS • • • • • • • L3.21 IRRIGATION DETAILS • • • • • • • L4.00 PLANT PALETTE AND NOTES • • • • • • • L4.01 PLANTING PLAN • • • • • • • L4.20 PLANTING DETAILS • • • • • • • L5.01 LANDSCAPE LIGHTING PLAN • • • • • • • L5.20 LANDSCAPE LIGHTING DETAILS • • • • • • • ARCHITECTURAL A1.1 SITE PLAN • • • • • • • • • A1.2 DEMOLITION SITE PLAN • • • • • • • • • A1.3 PHASING PLAN • • • • • • • • A1.4 ZOO MASTER ADDRESSING PLAN • • • • • • • A1.5 SITE PLAN WITH PARKING • • • • • A3.0.1 KEY PLANS • • • • • • • • • A3.0.2 KEY PLANS • • • • • • • • • A3.0.3 KEY PLANS • • • • • • • • • A3.1.1A FLOOR PLANS • • • • • • • • • A3.1.1B FLOOR PLANS • • • • • • • • • A3.1.2B FLOOR PLANS • • • • • • • • • A3.1.3B FLOOR PLANS • • • • • • • • • A3.2.1A REFLECTED CEILING PLANS • • • • • • • • A3.2.1B REFLECTED CEILING PLANS • • • • • • • • A3.2.2B REFLECTED CEILING PLAN • • • • • • • • A3.3.1A FURNITURE, POWER AND DATA PLANS • • • • • • • • A3.3.1B FURNITURE, POWER AND DATA PLANS • • • • • • • • A3.3.2B FURNITURE, POWER AND DATA PLANS • • • • • • • • A3.4.1A SIGNAGE PLAN • • • • • • • • A3.4.1B SIGNAGE PLAN • • • • • • • • A3.4.2B SIGNAGE PLAN • • • • • • • • A3.5.1A SLAB PLAN • • • • • • • • A3.5.1B SLAB PLAN • • • • • • • • A3.5.2B SLAB PLAN • • • • • • • • FIRST ST. E. MAIN ST. ZO O L N . 5 FWY SANTA ANA ZOO 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 DEFERRED SUBMITTALS TO BE REVIEWED BY PROJECT ARCHITECT OR ENGINEER OF RECORD AND CERTIFIED PRIOR TO SUBMITTAL FOR PLAN REVIEW. No.Description Date 1 DRC SUBMITTAL 02 11/21/24 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 7 PC SUBMITTAL 04 05/30/25 8 BID ADDENDUM 01 06/06/25 9 PC SUBMITTAL 06 07/31/25 SHEET #SHEET NAME 05 / 0 6 / 2 4 P R I C I N G P A C K A G E 08 / 1 4 / 2 4 D R C P C 0 1 11 / 2 1 / 2 0 2 4 D R C S U B M I T T A L 0 2 11 / 2 6 / 2 0 2 4 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 1 28 / 0 3 / 2 0 2 5 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 2 28 / 0 3 / 2 0 2 5 B I D S E T 08 / 0 5 / 2 0 2 5 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 3 29 / 0 5 / 2 5 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 4 12 / 0 6 / 2 5 B I D A D D E N D U M 0 1 A4.0.1 KEY ELEVATIONS • • • • • • • • • A4.0.2 KEY ELEVATIONS • • • • • • • • • A4.1.0 BUILDING A ELEVATIONS • • • • • • • • • A4.2.0 BUILDING B ELEVATIONS • • • • • • • • • A4.2.1 BUILDING B ELEVATION • • • • • • • • • A5.0.1 KEY SECTIONS • • • • • • • • A5.1.0 BUILDING SECTIONS BUILDING A • • • • • • • • A5.1.1 BUILDING SECTIONS BUILDING B • • • • • • • • A5.1.2 BUILDING SECTIONS BUILDING B • • • • • • • • A5.1.3 BUILDING SECTIONS BUILDING B • • • • • • • • A5.1.4 BUILDING SECTIONS BUILDING B • • • • • • • • A5.1.5 BUILDING SECTIONS BUILDING B • • • • • • • • A5.1.6 BUILDING SECTIONS BUILDING B • • • • • • • • A5.1.7 BUILDING SECTIONS BUILDING B • • • • • • • • A6.0.1 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • A6.0.2 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • A6.1 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.2 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.3 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.4 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.5 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.6 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.7 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.8 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.9 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.10 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.11 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.12 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.13.1 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.13.2 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.13.3 ENLARGED PLANS/ SECTIONS/ ELEVATIONS • • • • • A6.14 ENLARGED GATE PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.15.1 ENLARGED STAIRCASE PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.15.2 ENLARGED STAIRCASE PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.15.3 ENLARGED STAIRCASE PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.16 ENLARGED ELEVATOR PLANS/ SECTIONS/ ELEVATIONS • • • • • • • • A6.17 STOREFRONT PLANS AND ELEVATIONS • • • • • • • • A7.1 BLDG A WALL SECTIONS • • • • • • • • A7.2 WALL SECTIONS • • • • • • • • A7.3 WALL SECTIONS • • • • • • • • A7.4 WALL SECTIONS • • • • • • • • A7.5 WALL SECTIONS • • • • • • • • A7.6 WALL SECTIONS • • • • • • • A8.1 TYPICAL ASSEMBLIES • • • • • • • • A8.2 TYPICAL ASSEMBLIES • • • • • • • • A8.3 DETAILS • • • • • • • • A8.4 DETAILS • • • • • • • A8.5 DETAILS • • • • • • • A8.6 DETAILS • • • • • • • A8.7 DETAILS • • • • • • • A8.8 DETAILS • • • • • • • A8.9 LANDSCAPE FOOTING DETAILS • • • • • • • A8.10 MILLWORK DETAILS • • • • • • • A8.11 MILLWORK DETAILS • • • • • • • A8.12 MILLWORK DETAILS • • • • • • • A9.1 PROJECT SCHEDULES • • • • • • • • A9.2 WINDOW SCHEDULES • • • • • • • • A9.3 DOOR AND GATE SCHEDULES • • • • • • • • STRUCTURAL S0.01 SHEET INDEX, SYMBOLS AND ABBREVIATIONS • • • • • • • • S0.02 GENERAL NOTES • • • • • • • • S0.03 GENERAL NOTES • • • • • • • • S1.00 SITE PLAN • • • • • • • • S1.01A FOUNDATION FRAMING PLAN - BUILDING A • • • • • • • • S1.01B FOUNDATION FRAMING PLAN - BUILDING B • • • • • • • • SHEET #SHEET NAME 05 / 0 6 / 2 4 P R I C I N G P A C K A G E 08 / 1 4 / 2 4 D R C P C 0 1 11 / 2 1 / 2 0 2 4 D R C S U B M I T T A L 0 2 11 / 2 6 / 2 0 2 4 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 1 28 / 0 3 / 2 0 2 5 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 2 28 / 0 3 / 2 0 2 5 B I D S E T 08 / 0 5 / 2 0 2 5 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 3 29 / 0 5 / 2 5 B U I L D I N G & S A F E T Y P C S U B M I T T A L 0 4 12 / 0 6 / 2 5 B I D A D D E N D U M 0 1 S1.02A ROOF FRAMING PLAN - BUILDING A • • • • • • • • S1.02B LEVEL 2 CMD + STEEL FRAMING PLAN - BUILDING B • • • • • • • • S1.03B LEVEL 2 WOOD FRAMING PLAN - BUILDING B • • • • • • • • S1.04B ROOF FRAMING PLAN - BUILDING B • • • • • • • • S2.01 BUILDING B ELEVATION • • • • • • • • S5.01 TYPICAL CONCRETE DETAILS • • • • • • • • S5.02 TYPICAL CONCRETE DETAILS • • • • • • • • S5.03 TYPICAL CONCRETE DETAILS • • • • • • • • S5.11 CONCRETE SHEAR WALL DETAILS • • • • • • • • S6.01 TYPICAL WOOD DETAILS • • • • • • • • S6.02 TYPICAL WOOD DETAILS • • • • • • • • S6.03 TYPICAL WOOD DETAILS • • • • • • • • S6.04 TYPICAL WOOD DETAILS • • • • • • • • S6.05 WOOD SHEAR WALL DETAILS • • • • • • • • S6.06 WOOD SHEAR WALL DETAILS • • • • • • • • S6.21 TJI DETAILS • • • • • • • • S6.22 TJI-SHEAR WALL TRANSFER DETAILS • • • • • • • • S7.01 TYPICAL STEEL DETAILS • • • • • • • • S7.02 TYPICAL STEEL DETAILS • • • • • • • • S7.11 TYPICAL METAL DECK DETAILS • • • • • • • • S7.12 TYPICAL METAL DECK DETAILS • • • • • • • • MECHANICAL M-001 NOTES, LEGEND • • • • • • • • M-002 SCHEDULES • • • • • • • • M-003 SCHEDULES • • • • • • • • M-004 SPECIFICATIONS • • • • • • • • M-005 SPECIFICATIONS • • • • • • • • M-006 TITLE-24 REQUIREMENTS FOR VRF PIPE INSULATION • • • • • • M-200 SITE PLAN • • • • • • M-301 FIRST FLOOR PLAN • • • • • • • • M-302 SECOND FLOOR PLAN • • • • • • • • M-303 ROOF PLAN • • • • • • • • M-304 FIRST FLOOR REFRIGERATION PIPING • • • • • • • • M-305 SECOND FLOOR REGRIGERATION PIPING • • • • • • • • M-400 PIPING DIAGRAM • • • • • • • • M-401 WIRING DIAGRAM • • • • • • • • M-500 DETAILS • • • • • • • • M-600 TITLE-24 BUILDING-A • M-601 TITLE-24 BUILDING-A • M-602 TITLE-24 BUILDING-B • M-603 TITLE-24 BUILDING-B • M-604 TITLE-24 BUILDING-B • ELECTRICAL E-1.0 NOTES & SYMBOLS • • • • • • • • E-2.0 SINGLE LINE DIAGRAM & LOAD CALCS. • • • • • • • • E-2.1 PANEL SCHEDULES • • • • • • • • E-2.2 FIXTURES SCHEDULES • • • • • • • • E-2.3 CONTROL SWITCH SCHEDULE • • • • • • • • E-3.0 SITE ELECTRICAL PLAN • • • • • • • • E-3.1 EXTERIOR LIGHTING PLAN • • • • • • • • E-4.0 1ST. FLR. BUILDING A LIGHTING PLAN • • • • • • • • E-4.1 1ST. FLR. BUILDING A POWER PLAN • • • • • • • • E-4.2 1ST. FLR. BUILDING A L.V. PLAN • • • • • E-4.3 LIGHTING CONTROL PLAN • • • • • • E-5.0 1ST. FLR. BUILDING B LIGHTING PLAN • • • • • • • • E-5.1 1ST. FLR. BUILDING B POWER PLAN • • • • • • E-5.2 1ST. FLR. BUILDING B L.V. PLAN • • • • • E-5.3 LIGHTING CONTROL PLAN • • • • • • E-6.0 2ND FLR. BUILDING B LIGHTING PLAN • • • • • • • • E-6.1 2ND FLR. BUILDING B POWER PLAN • • • • • • E-6.2 2ND FLR. BUILDING B L.V. PLAN • • • • • E-6.3 LIGHTING CONTROL PLAN • • • • • • E-7.0 ROOF ELECTRICAL PLAN • • E-8.0 TITLE 24 ENERGY CALCULATIONS • • • • • • • • E-8.1 TITLE 24 ENERGY CALCULATIONS • • • • • • • • E-9.0 1ST FLR. BUILDING A EM. PHM PLAN • • • • • • E-9.1 1ST FLR. BUILDING B EM. PHM PLAN • • • • • • E-9.2 2ND FLR. BUILDING B EM. PHM PLAN • • • • • • PLUMBING P-001 NOTES, LEGEND • • • • • • • • P-002 SCHEDULES • • • • • • • • P-3.00 PHASE 1 SITE PLAN • • • • • P-3.01 FIRST FLOOR PLAN • • • • • • • • P-3.02 SECOND FLOOR PLAN • • • • • • • • P-3.03 ROOF PLAN • • • • • • • • P-4.01 HOT AND COLD WATER RISER DIAGRAM • • • • • • • • P-4.02 WASTE & VENT RISER DIAGRAM • • • • • • • • P-500 DETAILS • • • • • • • • 9 ROOM NAME 101 150 SF 1 A101 1 CONSTRUCTION GRID LINE PROPERTY LINE CENTER LINE SETBACK LINE BUILDING SECTION REFERENCE 1 A101 WALL SECTION REFERENCE 1 A101 BUILDING ELEVATION REFERENCE A101 1 1 1 1 INTERIOR ELEVATION REFERENCE INTERIOR ELEVATION REFERENCE 1 A101 101A 101 1011 DETAIL REFERENCE AREA DETAIL REFERENCE ELEVATION MARK ELEVATION MARK FINISH CALLOUT SEE FINISH SCHEDULE EQUIPMENT CALLOUT SEE EQUIPMENT SCHEDULE ROOM LABEL DOOR LABEL SEE DOOR SCHEDULE WINDOW LABEL SEE WINDOW SCHEDULE REVISION NUMBER RF-01 1 0'-0" L01 0'-0" 1 A101 1 A101 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC ABBREVIATIONS SYMBOLS LEGEND INFO = INFORMATION INSUL = INSULATION INT = INTERIOR INV = INVERTED JST = JOIST JT = JOINT L = ANGLE MAX = MAXIMUM M B = MACHINE BOLT MECH = MECHANICAL MIN = MINIMUM MTD = MOUNTED MTL = METAL N/A = NOT APPLICABLE (N) = NEW NLG = NAILING NTS = NOT TO SCALE O C = ON CENTER OPP = OPPOSITE PLT = PLATE PSF = POUNDS PER SQUARE FOOT PSI = POUNDS PER SQUARE INCH P T = PRESSURE TREATED PTD = PAINTED PW / PLY = PLYWOOD RCP = REFLECTED CEILING PLAN REQ'D = REQUIRED RET = RETAINING SHT = SHEET(S) SHTG = SHEATHING SIM = SIMILAR SPC(G) = SPACE(ING) ST STL = STAINLESS STEEL STAGG = STAGGERED STD = STANDARD STL = STEEL STRUCT = STRUCTURE T B S = TO BE SPECIFIED TEMP = TEMPERED T G = TEMPERED GLASS TH = THICKNESS T O = TOP OF T S = TUBULAR STEEL TYP = TYPICAL(LY) U N O = UNLESS NOTED OTHERWISE V / VERT = VERTICAL(LY) V I F = VERIFY IN FIELD WD = WOOD WPF(G) = WATERPROOFING W/ = WITH ∅= ROUND OR DIAMETER # = NUMBER AB = ANCHOR BOLT A B C = ALCOHOLIC BEVERAGE CONTROL ABV = ABOVE A F F = ABOVE FINISH FLOOR ALUM = ALUMINUM ARCH = ARCHITECTURAL DRAWINGS B / BOT = BOTTOM BD = BOARD BLDG = BUILDING BLK (G) = BLOCK(ING) BLW = BELOW BM = BEAM BRG = BEARING BYD = BEYOND CB = CATCH BASIN C.I.P. = CAST IN PLACE CL = CENTERLINE CLG = CEILING CLR = CLEAR C M U = CONCRETE MASONRY UNIT COL = COLUMN CONC = CONCRETE CONST = CONSTRUCTION CONT = CONTINUOUS (LY) CTR (D) = CENTER (ED) D / DIAM = DIAMETER DBL = DOUBLE DET = DETAIL DIM = DIMENSION DWG (S) = DRAWING(S) (E) = EXISTING EA = EACH E E = EACH END E F = EACH FACE EL / ELEV = ELEVATION ELECT = ELECTRICAL (DWGS) EQ = EQUAL E S = EACH SIDE E W = EACH WAY EXT = EXTERIOR F B = FLAT BLOCKING FDN = FOUNDATION FIN = FINISH FLR = FLOOR F O W = FACE OF WALL FRMG = FRAMING FTG = FOOTING GA = GAUGE GALV = GALVANIZED GEN = GENERAL GR = GRADE GSM = GALVANIZED SHEET METAL GWB = GYPSUM WALLBOARD GYP = GYPSUM HC = HANDICAPPED HDR = HEADER HGR = HANGER HT = HEIGHT GENERAL NOTES CLIENT ARCHITECT CONSULTANTS COORDINATION AND VERIFICATION FIRE CODE NOTES PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:04:06 PM 2308 G0.3 GENERAL NOTES MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1. CONTRACTOR TO COMPLY WITH CODES, LAWS, ORDINANCES, RULES, AND REGULATIONS OF PUBLIC AUTHORITIES GOVERNING THE WORK. 2. CONTRACTOR TO OBTAIN AND PAY FOR PERMITS AND INSPECTIONS REQUIRED BY PUBLIC AUTHORITIES GOVERNING THE WORK. 3. CONTRACTOR TO REVIEW DOCUMENTS, VERIFY DIMENSIONS AND FIELD CONDITIONS AND CONFIRM THAT WORK IS BUILDABLE AS SHOWN. REPORT ANY CONFLICTS OR OMISSIONS TO THE ARCHITECT FOR CLARIFICATION PRIOR TO PERFORMING ANY WORK IN QUESTION. 4. FOR SUBSTITUTIONS REFER TO SPECIFICATIONS. 5. CONTRACTOR TO COORDINATE WORK WITH THE SANTA ANA ZOO, INCLUDING SCHEDULING TIME AND LOCATIONS FOR DELIVERIES, BUILDING ACCESS, USE OF BUILDING SERVICES AND FACILITIES, AND USE OF ELEVATORS. COORDINATE WORK WITH OTHER CONTRACTS. MINIMIZE DISTURBANCE OF BUILDING FUNCTIONS AND OCCUPANTS, INCLUDING TRASH REMOVAL ACCESS. 6. CONTRACTOR TO COORDINATE TELECOMMUNICATIONS, DATA AND SECURITY SYSTEM INSTALLATIONS. 7. CONTRACTOR TO MAINTAIN EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES, AND ALARMS IN CONFORMANCE WITH CODES AND ORDINANCES. 8. CONTRACTOR TO PROTECT AREA OF WORK AND ADJACENT AREAS FROM DAMAGE. G.C. TO COORDINATE TRASH ACCESS. 9. CONTRACTOR TO MAINTAIN WORK AREAS SECURE AND LOCKABLE DURING CONSTRUCTION. 10. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON DRAWINGS. GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS, GRADES AND CONDITIONS AT SITE PRIOR TO COMMENCING THE WORK, AND REPORT ANY DISCREPANCIES TO THE CONSTRUCTION MANAGER AND ARCHITECT IN WRITING. 11. PARTITIONS ARE DIMENSIONED FROM FINISH FACE TO FINISH FACE, UNLESS OTHERWISE NOTED. MAINTAIN DIMENSIONS MARKED "CLEAR". ALLOW FOR THICKNESS OF FINISHES. 12. FLOOR LEVELS INDICATED ON DRAWINGS ARE FOR REFERENCE ONLY. PRIOR TO CONSTRUCTION GENERAL CONTRACTOR SHALL HIRE A THIRD PARTY LICENSED SURVEYOR TO FIELD VERIFY EXISTING GRADES AND FLOOR ELEVATIONS INDICATED ON DRAWING. NOTIFY THE ARCHITECT AND THE SANTA ANA ZOO REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES. 13. WHERE EXISTING ACCESS PANELS CONFLICT WITH CONSTRUCTION. CONTRACTOR TO RELOCATE PANELS TO ALIGN WITH AND FIT WITHIN NEW CONSTRUCTION. 14. CONTRACTOR TO UNDERCUT DOORS TO CLEAR TOP OF FLOOR FINISHES BY 1/4 INCH, UNLESS OTHERWISE NOTED. 15. CEILING HEIGHT DIMENSIONS ARE TO FINISHED SURFACES. 16. CONTRACTOR SHALL PROVIDE CONSTRUCTION BARRICADES OR FENCING AS REQUIRED AND AS APPROVED BY THE SANTA ANA ZOO FOR PUBLIC SAFETY PRIOR TO COMMENCING THE WORK. 17. CONTRACTOR TO COORDINATE AND PROVIDE BACKING FOR MILLWORK AND ITEMS ATTACHED OR MOUNTED TO WALLS OR CEILINGS. 18. FIRE PROTECTION EQUIPMENT AND SERVICE ACCESS MUST BE PROVIDED DURING THE CONSTRUCTION PERIOD AS REQUIRED BY THE SANTA ANA ZOO. 19. CONTRACTOR SHALL PROVIDE TEMPORARY EXIT SIGNS TO ASSURE A MEANS OF EGRESS DURING CONSTRUCTION. 20. WHERE A TYPICAL CONDITION IS DETAILED, IT SHALL BE UNDERSTOOD THAT ALL LIKE OR SIMILAR CONDITIONS ARE THE SAME UNLESS SPECIFICALLY NOTED OR DETAILED OTHERWISE. 21. GENERAL CONTRACTOR SHALL COORDINATE SITE PLUMBING,DRAINAGE, ELECTRICAL, TELEPHONE WORK AND EXISTING UTILITIES TO PROVIDE A COMPLETE OPERATING SYSTEM. 22. EXCEPT WHERE SHOWN IN DIMENSIONAL DETAIL, THE LOCATIONS OF PLUMBING, MECHANICAL EQUIPMENT, DUCTS, PIPING, AND FITTING ARE ONLY APPROXIMATE. THE EXACT LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR, SUBJECT TO APPROVAL BY THE SANTA ANA ZOO REPRESENTATIVE. 23. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BLOCKING, BACK-UP PLATES AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK, TOILET ROOM ACCESSORIES, FIXTURES AND PARTITIONS AND ALL WALL MOUNTED OR SUSPENDED MECHANICAL, ELECTRICAL OR MISCELLANEOUS EQUIPMENT AND FURNISHINGS. 24. MECHANICAL SUPPLY AND RETURN AIR SHAFTS SHALL BE AIRTIGHT AND SEALED. 25. ALL WORK PERFORMED SHALL COMPLY WITH THE CONTRACT DOCUMENTS, DRAWINGS AND SPECIFICATIONS, INCLUDING THESE GENERAL NOTES. THE CONTRACTOR SHALL COORDINATE THE INTENT OF THE GENERAL NOTES WITH ALL TRADES. 26. SPECIFICATIONS, BOUND SEPARATELY, ARE PART OF THE CONTRACT DOCUMENTS. 27. THE ORGANIZATION OF THE DRAWINGS AND SPECIFICATIONS SHALL NOT CONTROL THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE. 28. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE DRAWINGS AND SPECIFICATIONS. IF CONFLICT IS FOUND BETWEEN DRAWINGS, GENERAL NOTES AND SPECIFICATIONS, CONSULT THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 29. NO DEVIATION FROM CONTRACT DRAWINGS AND SPECIFICATIONS SHALL BE MADE WITHOUT WRITTEN APPROVAL OF THE ARCHITECT. 30. DOORS OPENING INTO REQUIRED 1-HOUR, FIRE-RESISTIVE CORRIDORS SHALL BE PROTECTED WITH A SMOKE OR DRAFT STOP ASSEMBLY HAVING A 20-MINUTE RATING AND SHALL BE SELF-CLOSING. 31. 20-MINUTE DOOR JAMBS TO BE TIGHT-FITTING, SMOKE AND DRAFT CONTROLLED. 32. EXIT DOORS SHALL SWING IN THE DIRECTION OF TRAVEL WHEN SERVING 50 OR MORE PERSONS AND IN ANY HAZARDOUS AREA. 33. PROVIDE FIRE DAMPERS OR DOORS WHERE AIR DUCTS PENETRATE FIRE-RATED WALLS OR CEILINGS. 34. WOOD BLOCKING SHALL BE FIRE TREATED IN ACCORDANCE WITH APPLICABLE CODE REQUIREMENTS. 35. IF THE SPACE ABOVE THE SUSPENDED CEILING IS USED AS A RETURN AIR PLENUM, THEN ALL EQUIPMENT AND WIRING(COMMUNICATION, POWER ETC) SHALL BE LISTED FOR INSTALLATION IN A PLENUM. 36. ALL FLEXIBLE AIRDUCTS, IF USED, SHALL MEET THE REQUIREMENTS OF NFPA 90A, 2-3-2 IN CONSTRUCTION AND INSTALLATION. 37. PROVIDE ALL ACCESS PANELS REQUIRED FOR ALL JUNCTION BOXES, VALVES, CLEANOUTS, PLUGS, FILTERS, EQUIPMENT AND ALL OTHER ITEMS REQUIRING SERVICE AND MAINTENANCE. 38. PENETRATIONS IN WALLS REQUIRING PROTECTED OPENINGS MUST BE FIRESTOPPED WITH AN APPROVED MATERIAL IN ACCORDANCE WITH CBC SECTION 714. SPACE BETWEEN PENETRATING MATERIALS (DESCRIBED BELOW) MUST BE DESIGNED TO PREVENT THE MOVEMENT OF HOT FLAME OR GASES A. STEEL, COPPER OR FERROUS PIPES OR CONDUITS MAY PENETRATE CONCRETE OR MASONRY WALLS WHERE THE PENETRATING ITEM IS A MAXIMUM 6-INCH DIAMETER AND THE AREA OF THE OPENING THROUGH THE WALL DOES NOT EXCEED 144 SQUARE INCHES. B. MEMBRANE PENETRATIONS OF MAXIMUM 2-HR. FIRE-RESISTANCE RATED WALL AND PARTITIONS BY STEEL ELECTRICAL OUTLET BOXES NOT EXCEEDING 16 SQUARE INCHES ARE PERMITTED PROVIDED OPENINGS DO NOT EXCEED 100 SQUARE INCHES FOR ANY 100 SQUARE FEET OF WALL AREA. OUTLET BOXES ON OPPOSITE SIDES OF WALLS OR PARTITIONS MUST BE SEPARATED BY A HORIZONTAL DISTANCE OF 24 INCHES. C. WHERE WALLS ARE PENETRATED BY OTHER MATERIALS OR WHERE LARGER OPENINGS ARE REQUIRED THAN PERMITTED IN (B) ABOVE, THEY MUST BE QUALIFIED BY TESTS CONDUCTED IN ACCORDANCE WITH SECTION. 39. SMOKE AND FIRE DAMPERS MUST BE INSTALLED IN THE FOLLOWING LOCATIONS PER CBC SECTION 717 A. DUCT PENETRATIONS OF FIRE WALLS IN ACCORDANCE TO SECTION B. DUCT PENETRATIONS OF FIRE BARRIERS, EXCEPT EXIT ENCLOSURES AND EXIT PASSAGEWAYS WHERE THEY ARE NOT ALLOWED TO PENETRATE. C. DUCTS PENETRATING SHAFTS. D. DUCTS PENETRATING FIRE PARTITIONS AND FIRE-RATED CORRIDOR WALLS. SEE EXCEPTION FOR STEEL DUCTS WITH NO OPENINGS INTO CORRIDOR E. DUCTS PENETRATING SMOKE BAFFLERS F. DUCTS PENETRATING HORIZONTAL ASSEMBLIES 40. INTERIOR FINISH MATERIALS APPLIED TO WALL AND CEILINGS SHALL BE TESTED AS SPECIFIED IN SECTION 803. SPECIFY THE CLASSIFICATIONS PER TABLE 803.1.2. 41. ALL EXIT DOORS SHALL COMPLY WITH CBC SECTION 1010 A. CLEAR WIDTH OF EACH DOOR OPENING SHALL BE MIN. 32" OR PER CBC SECTION 1005, WHICHEVER IS GREATER B. MIN. DOOR HEIGHT OF 6'-8" C. SHALL BE CAPABLE OF OPENING 90 DEGREES. D. THE MAXIMUM WIDTH OF A SWINGING DOOR LEAF SHALL BE 48" NOMINAL. E. EXIT DOOR SHALL BE SIDE-HINGED SWINGING TYPE. 42. BUILDING SHALL COMPLY WITH BUILDING SAFETY REGULATONS, SANTA ANA MUNICIPAL CODE CHAPTER 8 DIVISION 3. 1. STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING DRAWINGS AND SPECIFICATIONS ARE SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS, BUT TOGETHER WITH THE ARCHITECTURAL DRAWINGS FORM THE PROJECT DOCUMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COMPLY WITH AND COORDINATE WITH THE ARCHITECTURAL DRAWINGS. BEFORE THE INSTALLATION OF STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING WORK. SHOULD THERE BE A DISCREPANCY DISCOVERED BETWEEN THE ARCHITECTURAL DRAWINGS AND THE CONSULTANT ENGINEER'S DRAWINGS, IT SHALL BE BROUGHT TO THE ARCHITECT AND THE SANTA ANA ZOO REPRESENTATIVE'S ATTENTION FOR CLARIFICATION PRIOR TO INSTALLATION. CONTRACTOR SHALL NOT, EITHER KNOWINGLY OR IF HE SHOULD HAVE KNOWN BASED ON INFORMATION CONTAINED IN THE CONTRACT DOCUMENTS, INSTALL WORK IN CONFLICT WITH THE ARCHITECTURAL DRAWINGS. ANY SUCH WORK SHALL BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND AT NO ADDITIONAL COST TO THE SANTA ANA ZOO. 2. DO NOT SCALE DRAWINGS. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATION AND ALL EXISTING CONDITIONS AT THE SITE BEFORE COMMENCING WORK AND REPORT ANY DISCREPANCIES TO THE ARCHITECT AND THE SANTA ANA ZOO REPRESENTATIVE PRIOR TO THE START OF THE WORK. 3. IN THE EVENT OF CONFLICT BETWEEN THE DRAWING AND SPECIFICATIONS, OR WITHIN THEMSELVES, THE ARCHITECT WILL IN CONSULTATION WITH THE SANTA ANA ZOO DETERMINE WHICH CONFLICTING REQUIREMENT GOVERNS. 4. SPECIFIC NOTES OR KEYNOTES ON DETAILS APPLY TO SIMILAR CONDITIONS ON OTHER DETAILS ON ALL DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 5. ALL MANUFACTURED MATERIALS USED SHALL BEAR THE APPROPRIATE U.L. LABELS. CONTRACTOR ARE TO VERIFY DIMENSIONS, ELEVATIONS AND EXISTING CONDITIONS AT THE SITE BEFORE COMMENCING WORK AND REPORT DISCREPANCIES TO THE ARCHITECT AND THE SANTA ANA ZOO REPRESENTATIVE FOR RESOLUTION PRIOR TO THE START OF THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING EXISTING JOB SITE CONDITIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE WHICH SHOULD CHANGE THE AESTHETIC INTENT OR HINDER PROPER WORK COMPLETIONS BEFORE FABRICATING ANY MATERIAL AND SHALL REPORT ANY DISCREPANCIES TO THE SANTA ANA ZOO REPRESENTATIVE. 6. VERIFY SIZES AND LOCATIONS OF ALL MECHANICAL EQUIPMENT SIZES, EQUIPMENT PADS AND BASES REQUIREMENTS, AS WELL AS POWER AND WATER OR DRAIN INSTALLATIONS WITH EQUIPMENT MANUFACTURERS BEFORE PROCEEDING WITH THE WORK. CHANGES TO ACCOMMODATE FIELD CONDITIONS OR SUBSTITUTIONS SHALL BE MADE WITHOUT ADDITIONAL COST TO THE SANTA ANA ZOO REPRESENTATIVE. 7. VERIFY ALL OPENINGS IN THE FIELD PRIOR TO THE FABRICATION OF DOORS AND FRAMES. 8. PROVIDE AND COORDINATE THE EXACT DIMENSIONS, SIZES, AND POSITIONS OF OPENINGS IN SLABS AND WALLS NECESSARY FOR THE INSTALLATION OF THE WORK. 9. VALVES, CONTROLS AND TERMINATION SHALL BE POSITIONED FOR SAFE, DIRECT AND EASY ACCESS. PIPING AND DUCTWORK SHALL BE INSTALLED FOR CONVENIENT FUTURE ADDITIONS AND MODIFICATIONS. 10. VERIFY AND COORDINATE SIZES, LOCATIONS AND CHARACTERISTICS OF ALL WORK AND EQUIPMENT TO BE FURNISHED BY OTHERS, WITH THE MANUFACTURER OR SUPPLIER BEFORE ANY CONSTRUCTION. 11. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST DAMAGE, BREAKAGE, COLLAPSE AND MISALIGNMENT ACCORDING TO APPLICABLE CODES, STANDARDS AND GOOD CONSTRUCTION PRACTICES. 12. THE CONTRACTOR IS TO BE RESPONSIBLE FOR CLEANUP OF ALL TRADES AND REMOVAL OF ALL DEBRIS. THE COMPLETED WORK SHALL BE LEFT CLEAN AND READY FOR OCCUPANCY. 13. CONTRACTOR SHALL CORRECT ANY DAMAGE CREATED BY THE CONTRACTOR OR ANY OR THE CONTRACTOR'S SUBCONTRACTORS. 14. FURNISH AND INSTALL EXPANSION JOINTS, CONTROL JOINTS, ETC. WHETHER OR NOT DOCUMENTED. COORDINATE WITH FINAL LOCATION OF THESE ITEMS WITH THE SANTA ANA ZOO REPRESENTATIVE PRIOR TO COMMENCING WORK. FIRE PROTECTION 1. PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2- A10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF THE BUILDING; ALSO DURING CONSTRUCTION. REFER TO PLANS FOR LOCATIONS 2. PROVIDE ADDITIONAL FIRE EXTINGUISHERS AS REQUIRED BY THE ORANGE COUNTRY FIRE AUTHORITY FIRE MARSHALL 3. THIS BUILDING MUST BE EQUIPPED WITH AN AUTOMATIC FIRE EXTINGUISHING SYSTEM, COMPLYING WITH (NFPA-13); THE SPRINKLER SYSTEM SHALL BE APPROVED BY SANTA ANA ZOO BUILDING OFFICIAL PRIOR TO INSTALLATION. MEANS OF EGRESS 1. TWO EXITS ARE REQUIRED FROM EACH SPACE OR STORY. (T 1006.2.1) A. OCCUPANT LOAD > 49, (A, *B, E, F, M, U) B. OCCUPANT LOAD > 10, (R) C. OCCUPANT LOAD > 29, (S) D. COMMON PATH OF EGRESS > 75 FT. E. COMMON PATH OF EGRESS > 100 FT. (B, F, S) SPRINKLERED BUILDING * > 29 (B) 2. ALL EXIT DOORS SHALL COMPLY WITH SECTION 1010.1 A. CLEAR WIDTH OF EACH DOOR OPENING SHALL BE MIN. 32 ”OR PER 1005.3.2, WHICHEVER IS GREATER B. MIN. DOOR HEIGHT IS 6’-8” C. SHALL BE CAPABLE OF OPENING 90 DEGREES D. THE MAXIMUM WIDTH OF A SWINGING DOOR LEAF SHALL BE 48 ”NOMINAL E. EXIT DOOR SHALL BE SIDE-HINGED SWINGING TYPE 3. PANIC HARDWARE SHALL BE PROVIDED ON EXIT DOORS HANDLING AN OCCUPANT CAPACITY OF 50 OR MORE PERSONS, FROM ANY GROUP A, E OR I OCCUPANCY; AND FOR H1, 2, 3, 6, 7,8 OCCUPANCY AND SOUND STAGES. ONLY PANIC HARDWARE APPROVED AND LISTED BY THE CAMPUS FIRE MARSHALL SHALL BE INSTALLED. 4. PROVIDE A 1 HR. FIRE RATED CORRIDOR IN ACCORDANCE WITH CBC SECTION 1020. A. OCCUPANT LOAD > 30 B. OCCUPANT LOAD > 10 C. R OCCUPANCIES D. E OCCUPANCIES E. I OCCUPANCIES F. H OCCUPANCIES 5. ALL ELECTRICAL ROOM DOORS SHALL BE 60 MINUTES. MAGNETIC HOLD OPENS SHALL BE USED WHERE ELECTRICAL ROOM DOORS OCCUR WITHIN AN ELEVATOR LOBBY. 6. PROVIDE A MINIMUM CORRIDOR WIDTH OF 44 INCHES OR PER 1005.3.2, WHICHEVER IS GREATER (T 1020.2). 7. FLOORS OR LANDINGS ON EACH SIDE OF DOORS TO HAVE THE SAME ELEVATION. LANDINGS SHALL BE LEVEL EXCEPT FOR EXTERIOR LANDINGS (MAX. 2% SLOPE) (CBC SECTION 1010). 8. SPACES BETWEEN TWO DOORS IN SERIES SHALL BE A MIN. 48 ”PLUS THE WIDTH OF THE DOOR SWINGING INTO THE SPACE. (CBC SECTION 1010) 9. WHERE TWO OR MORE EXITS ARE REQUIRED, AT LEAST TWO EXITS MUST BE SEPARATED BY 1/2 THE MAX. DIAGONAL LENGTH OF THE AREA SERVED OR 1/3 THE MAX. DIAGONAL IF SPRINKLERED (CBC SECTION 1010) 10. LANDING WIDTH AT DOORS MUST HAVE A MIN. CLEAR DIMENSION OF DOORS SERVED. MIN. LENGTH OF SUCH LANDINGS IS 44" (36") (CBC SECTION 1010) 11. THE MEANS OF EGRESS SYSTEM MUST HAVE A CLEAR CEILING HEIGHT OF 7'-6. (CBC SECTION 1003) 12. FIRE-RATED ASSEMBLIES SHALL BE PER CBC SECTION 721, GENERIC ASSEMBLIES OF GYPSUM HANDBOOK OR ICC APPROVAL NO.DESCRIPTION DATE 3 PC01 CORRECTIONS 03/28/25 3 130 SF B BREAK ROOM 102 1 523 SF B WORKSHOP 107 4 315 SF S MATERIAL STORAGE 108 2 61 SF S ELECTRICAL ROOM 109 1 72 SF S CUSTODIAN CLOSET 110 1 33 SF S LUNCH STORAGE 113 1 137 SF ADA FAMILY RESTROOM 104 0 54 SF S MACHINE ROOM 112 1 59 SF B TICKET BOOTH 105 1 252 SF RESTROOM 114 0 184 SF S FURNITURE STORAGE 103 1 8 3 3 4 1 1 1 0 0 24 1 17 12 74 75 74 75 1 1 1 REQUIRED DOOR WIDTH= 74 x 0.15"=11.1" PROPOSED DOOR WIDTH=36" DOOR IS EQUIPPED WITH PANIC HARDWARE REQUIRED DOOR WIDTH= 74 x 0.15"=11.1" PROPOSED DOOR WIDTH=36" DOOR IS EQUIPPED WITH PANIC HARDWARE REQUIRED DOOR WIDTH= 83 x 0.15"=11.25" PROPOSED DOOR WIDTH=72" DOOR IS EQUIPPED WITH PANIC HARDWARE REQUIRED DOOR WIDTH= 75 x 0.15"=11.25" PROPOSED DOOR WIDTH=72" DOOR IS EQUIPPED WITH PANIC HARDWARE REQUIRED DOOR WIDTH= 17 x 0.15"=2.55" PROPOSED DOOR WIDTH=36" REQUIRED DOOR WIDTH= 12 x 0.15"=1.8" PROPOSED DOOR WIDTH=36" REQUIRED DOOR WIDTH= 4 x 0.15"=0.6" PROPOSED DOOR WIDTH=72" REQUIRED STAIRCASE WIDTH=24 x 0.2"=4.8" PROPOSED STAIR WIDTH= 59 1/8" REQUIRED STAIRCASE WIDTH= 8 x 0.2"=1.6" PROPOSED STAIR WIDTH= 44" ELEVATOR 111 76 SF S STORAGE 115 1 4E(1) 2B(1) 4E(1) 4E(1) 1 HOUR FIRE RATED WALL FOR WALL TYPE 2B, SEE 4/A8.1 (UL RATING UL U305) FOR WALL TYPE 3A, SEE 5/A8.1 (UL RATING UL DES U329) FOR WALL TYPE 3B, SEE 6/A8.1 (UL RATING UL DES U329) FOR WALL TYPE 4E, SEE 12/A8.1(UL RATING UL U305) FOR WALL TYPE 4F, SEE 13/A8.1 (UL RATING UL U305) 3B(1) 3A(1) 3B(1) 1B ( 2 ) 1A ( 2 ) 1B ( 2 ) 1A(2) 2A 1A ( 2 ) 1A ( 2 ) 1A(2) CBC TABLE 705.5, FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS BASED ON FIRE SEPARATION DISTANCE: SEPARATION DISTANCE FALLS BETWEEN 10 AND 30 FEET, AND THE CONSTRUCTION IS TYPE VB WITH OCCUPANCY TYPE B, A FIRE SEPARATION IS NOT REQUIRED. CBC TABLE 705.8, MAXIMUM AREA OF EXTERIOR WALL OPENINGS BASED ON FIRE SEPARATION DISTANCE AND DEGREE OF OPENING PROTECTION: SEPARATION DISTANCE FOR THE OPENINGS ON THIS WALL ARE BETWEEN 10 AND 15 FEET WITH UNPROTECTED, SPRINKLERED PROTECTION, THE ALLOWABLE OPENING AREA IS 45% 45 MINUTE RATED DOOR; SEE A9.3 DOOR SCHEDULE 45 MINUTE RATED DOOR; SEE A9.3 DOOR SCHEDULE 2 HOURS OR MORE FIRE RATED WALL FOR WALL TYPE 1A, SEE 1/A8.1: WALL TYPE 1A IS AN 8 INCH THICK CONCRETE WALL. PER CBC TABLE 722.2.1.1 CAST IN PLACE OR PRECAST WALLS, ALL CONCRETE WALL TYPES ABOVE 5" THICK ARE MORE THAN 2 HOURS FIRE RATED. 4F(1) 45 MINUTE RATED DOOR; SEE A9.3 DOOR SCHEDULE 103A 102A 101A 108C FIRE SEPARATION IMAGINARY LINE CBC TABLE 705.5, FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS BASED ON FIRE SEPARATION DISTANCE: SEPARATION DISTANCE FALLS BETWEEN 5 AND 10 FEET, AND THE CONSTRUCTION IS TYPE VB WITH OCCUPANCY TYPE A AND B, A FIRE SEPARATION IS NOT REQUIRED. CBC TABLE 705.5, FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS BASED ON FIRE SEPARATION DISTANCE: SEPARATION DISTANCE FALLS BETWEEN 10 AND 30 FEET, AND THE CONSTRUCTION IS TYPE VB WITH OCCUPANCY TYPE A, A FIRE SEPARATION IS NOT REQUIRED. 13' - 5 5/8" 13' - 5 5/8" 12' - 5"12' - 5" 12' - 8 3/8" 12' - 11 1/2" 13' - 1" 12' - 10 5/8" 12' - 9 1/4" 13' - 11 3/4" 16' - 4 5/8" 2270 SF A MULTIPURPOSE ROOM 101 327 PROVIDE A SIGNAGE INDICATING GATE TO BE OPEN DURING BUSSINESS HOURS PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/ 2 9 / 2 0 2 5 3 : 2 5 : 4 9 P M 2308 CODE ANALYSIS MAY 30, 2025 PLAN CHECK SUBMITTAL 04 G0.4.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 30, 2025 BUILDING A BUILDING HEIGHT AND AREA, OCCUPANCY A-3 PER CBC TABLE 504.3, TYPE V-B CONSTRUCTION, S (WITHOUT AREA INCREASE): MAXIMUM ALLOWABLE BUILDING HEIGHT: 60'-0" PROPOSED BUILDING HEIGHT: 21'-1 1/2" PER CBC TABLE 504.4, TYPE V-B CONSTRUCTION, S (WITHOUT AREA INCREASE): MAXIMUM ALLOWABLE BUILDING STORIES: 2 PROPOSED BUILDING STORIES: 1 PER CBC TABLE 506.2, TYPE V-B CONSTRUCTION, S1: MAXIMUM ALLOWABLE BUILDING AREA: 6,000 SF PROPOSED BUILDING AREA: 3,328 SF ALL EXITS ARE TO BE OPENABLE FROM INSIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE. OCCUPANY TABULATION PER 2022 CBC TABLE 1004.5 RM. NO.NAME OCC.ROOM OCCUPANCY AREA SF/ PERSON PERSONS 101 MULTIPURPOSE ROOM A Assembly - Concentrated (chairs only - not fixed) 2270 SF 7 325 102 BREAK ROOM B Business Areas 130 SF 150 1 103 FURNITURE STORAGE S Accessory Storage Areas, Mechanical Equipment Room 184 SF 300 1 104 ADA FAMILY RESTROOM (none) 137 SF 105 TICKET BOOTH B Business Areas 59 SF 150 1 106 LOWER HUB (none) 364 SF 107 WORKSHOP B Business Areas 523 SF 150 4 108 MATERIAL STORAGE S Accessory Storage Areas, Mechanical Equipment Room 315 SF 300 2 109 ELECTRICAL ROOM S Accessory Storage Areas, Mechanical Equipment Room 61 SF 300 1 110 CUSTODIAN CLOSET S Accessory Storage Areas, Mechanical Equipment Room 72 SF 300 1 111 ELEVATOR (none) 58 SF 112 MACHINE ROOM S Accessory Storage Areas, Mechanical Equipment Room 54 SF 300 1 113 LUNCH STORAGE S Accessory Storage Areas, Mechanical Equipment Room 33 SF 300 1 114 RESTROOM (none) 252 SF 115 STORAGE S Accessory Storage Areas, Mechanical Equipment Room 76 SF 300 1 201 UPPER HUB (none) 900 SF 202 MEDIUM OFFICE B Business Areas 129 SF 150 1 203 LARGE OFFICE B Business Areas 217 SF 150 2 204 CLOSET S Accessory Storage Areas, Mechanical Equipment Room 37 SF 300 1 205 CLOSET S Accessory Storage Areas, Mechanical Equipment Room 37 SF 300 1 206 IT ROOM S Accessory Storage Areas, Mechanical Equipment Room 56 SF 300 1 207 MEETING ROOM A Assembly - Unconcentrated (Tables and Chairs) 170 SF 15 12 208 LARGE OFFICE B Business Areas 217 SF 150 2 209 MEDIUM OFFICE B Business Areas 129 SF 150 1 210 SMALL OFFICE B Business Areas 100 SF 150 1 211 SMALL OFFICE B Business Areas 100 SF 150 1 212 SMALL OFFICE B Business Areas 101 SF 150 1 213 SMALL OFFICE B Business Areas 101 SF 150 1 214 MEDIUM OFFICE B Business Areas 130 SF 150 1 215 BREAK ROOM B Business Areas 291 SF 150 2 216 STORAGE S Accessory Storage Areas, Mechanical Equipment Room 74 SF 300 1 217 STAFF RESTROOM (none) 59 SF 218 SHARED OFFICE B Business Areas 202 SF 150 2 219 CLOSET S Accessory Storage Areas, Mechanical Equipment Room 35 SF 300 1 371 3/16" = 1'-0"3BUILDING A & B LEVEL 1 CODE ANALYSIS PLAN 422.2 SEPARATE FACILITIES SEPARATE TOILET FACILITIES SHALL BE PROVIDED FOR EACH SEX. EXCEPTIONS: [NOT ADOPTED FOR OSHPD 1, 2, 3, 4 & 5] (3) IN BUSINESS AND MERCANTILE OCCUPANCIES WITH A TOTAL OCCUPANT LOAD OF 50 OR LESS INCLUDING CUSTOMERS AND EMPLOYEES, ONE TOILET FACILITY, DESIGNED FOR USE BY NO MORE THAN ONE PERSON AT A TIME, SHALL BE PERMITTED FOR USE BY BOTH SEXES. (4) [BSC & DSA-SS] SEPARATE FACILITIES SHALL NOT BE REQUIRED WHERE ROOMS HAVE FIXTURES DESIGNED FOR USE BY ALL GENDERS AND THE WATER CLOSETS ARE INSTALLED IN PRIVACY COMPARTMENTS. URINALS, WHEN INSTALLED, SHALL BE LOCATED IN A PRIVACY COMPARTMENT OR SEPARATE PRIVATE AREA. EACH COMPARTMENT DOOR SHALL BE LOCKABLE FROM THE INSIDE OF THE COMPARTMENT, WITH A DOOR LOCKING DEVICE THAT IS READILY DISTINGUISHABLE AS LOCKED FROM THE OUTSIDE OF THE COMPARTMENT. PRIVACY COMPARTMENTS AND DOORS WHICH ARE NOT FULL HEIGHT OR FLOOR TO CEILING MAY BE PERMITTED BY THE ENFORCING AGENCY. BUILDING B BUILDING HEIGHT AND AREA, OCCUPANCY B PER CBC TABLE 504.3, TYPE V-B CONSTRUCTION, S (WITHOUT AREA INCREASE): MAXIMUM ALLOWABLE BUILDING HEIGHT: 60'-0" PROPOSED BUILDING HEIGHT: 30'-8 1/2" PER CBC TABLE 504.4, TYPE V-B CONSTRUCTION, S (WITHOUT AREA INCREASE): MAXIMUM ALLOWABLE BUILDING STORIES: 3 PROPOSED BUILDING STORIES: 2 PER CBC TABLE 506.2, TYPE V-B CONSTRUCTION, SM: MAXIMUM ALLOWABLE BUILDING AREA: 9,000 SF PROPOSED BUILDING AREA: 7,084 SF 25 No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 7 PC SUBMITTAL 04 05/30/25 OCCUPANCY SF CALCULATION FOR BLDG A: ASSEMBLY (CONCENTRATED, CHAIRS ONLY - NOT FIXED) (A) : 2,270 SF BUSINESS AREAS (B): 130 SF ACCESSORY STORAGE AREAS, MECHANICAL EQP ROOM (S-1): 184 SF AGGREGATE ACCESSORY OCCUPANCIES: 314 SF TOTAL PERCENT OF ACCESSORY OCCUPANCY: 13% PER CBC TABLE 508.4, THERE IS A 1 HOUR SEPARATION REQUIRED BETWEEN A AND (B+S1) OCCUPANCIES. SEE 1/G0.4.1 FOR FIRE RATED WALL AND DOORS. OCCUPANCY SF CALCULATION FOR BLDG B: BUSINESS AREAS (B): 2,467 SF ACCESSORY STORAGE AREAS, MECHANICAL EQP ROOM (S-1): 855 SF TOTAL PERCENT OF ACCESSORY OCCUPANCY: 34% NO SEPARATION OF OCCUPANCY REQUIRED PER CBC TABLE 508.4 BETWEEN B AND S1. 7 7 202 SF B SHARED OFFICE 218 2 217 SF B LARGE OFFICE 203 2 170 SF A MEETING ROOM 207 1256 SF S IT ROOM 206 1 217 SF B LARGE OFFICE 208 2 129 SF B MEDIUM OFFICE 209 1 100 SF B SMALL OFFICE 210 1 101 SF B SMALL OFFICE 213 1 74 SF S STORAGE 216 1 130 SF B MEDIUM OFFICE 214 1 101 SF B SMALL OFFICE 212 1100 SF B SMALL OFFICE 211 1 129 SF B MEDIUM OFFICE 202 1 37 SF S CLOSET 204 1 37 SF S CLOSET 205 1 35 SF S CLOSET 219 1 291 SF B BREAK ROOM 215 2 TERRACE 59 SF STAFF RESTROOM 217 0 REQUIRED DOOR WIDTH= 8 x 0.15"=1.2" PROPOSED DOOR WIDTH=36" REQUIRED STAIRCASE WIDTH=24 x 0.2"=4.8" PROPOSED STAIR WIDTH= 59 1/8" REMOTE POINT A PER CBC TABLE 1017.2, TYPE V-B CONSTRUCTION, WITH SPRINKLER SYSTEM: MAXIMUM EXIT ACCESS TRAVEL DISTANCE: 250' PROPOSED EXIT ACCESS TRAVEL DISTANCE: 126' - 4" 1 3 1 1 3 1 1 1 1 1 1 1 0 1 3 12 1 2 24 8 8 REQUIRED STAIRCASE WIDTH= 8 x 0.2"=1.6" PROPOSED STAIR WIDTH= 44" A 13' - 3" 13' - 0" 11" 29' - 1" 15' - 8" 3' - 3" 7' - 5" 18' - 0" 4' - 10" 12' - 8" 3' - 11 1/8" 5 CBC TABLE 705.5, FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS BASED ON FIRE SEPARATION DISTANCE: SINCE THE SEPARATION DISTANCE IS LESS THAN 5 FEET AND THE OCCUPANCY GROUP IS A AND B, A FIRE SEPARATION OF 1 HOUR IS REQUIRED. 2 G0.4.2 3 G0.4.2 45 MINUTE RATED WINDOW, SEE A9.2 WINDOW SCHEDULE FOR SPECS 45 MINUTE RATED WINDOW, SEE A9.2 WINDOW SCHEDULE FOR SPECS 45 MINUTE RATED CURTAIN WALL AND DOOR, SEE A6.17 STOREFRONT PLANS AND ELEVATIONS FOR SPECS 3B(1) 3A(1) 1 HOUR FIRE RATED WALL FOR WALL TYPE 2B, SEE 4/A8.1 (UL RATING UL U305) FOR WALL TYPE 3A, SEE 5/A8.1 (UL RATING UL DES U329) FOR WALL TYPE 3B, SEE 6/A8.1 (UL RATING UL DES U329) FOR WALL TYPE 4E, SEE 12/A8.1(UL RATING UL U305) FOR WALL TYPE 4D: SEE FOR WALL TYPE 4F, SEE 13/A8.1 (UL RATING UL U305) 2 HOURS OR MORE FIRE RATED WALL FOR WALL TYPE 1A, SEE 1/A8.1: WALL TYPE 1A IS AN 8 INCH THICK CONCRETE WALL. PER CBC TABLE 722.2.1.1 CAST IN PLACE OR PRECAST WALLS, ALL CONCRETE WALL TYPES ABOVE 5" THICK ARE MORE THAN 2 HOURS FIRE RATED. 2081 2034 S1011 2B(1) 4E(1)4E(1) 4E(1) FIRE SEPARATION IMAGINARY LINE CBC TABLE 705.5, FIRE-RESISTANCE RATING REQUIREMENTS FOR EXTERIOR WALLS BASED ON FIRE SEPARATION DISTANCE: SEPARATION DISTANCE FALLS BETWEEN 5 AND 10 FEET, AND THE OCCUPANCY GROUP IS A AND B, AND THE CONSTRUCTION IS TYPE VB WITH OCCUPANCY TYPE A, A FIRE SEPARATION OF 1 HOUR IS REQUIRED. 2' - 5 3/4" 2' - 5 3/4" 7' - 4 1/8" 7' - 4 1/8" 6' - 8 3/4" 6' - 2 7/8" 3' - 0 3/8" 3' - 6 3/4" LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" SECURITY GATE IN CLOSED POSITION CBC TABLE 705.8, MAXIMUM AREA OF EXTERIOR WALL OPENINGS BASED ON FIRE SEPARATION DISTANCE AND DEGREE OF OPENING PROTECTION: SEPARATION DISTANCE FOR THE CURTAIN WALL OPENING IS BETWEEN 10 AND 15 FEET WITH UNPROTECTED, SPRINKLERED PROTECTION, THE ALLOWABLE OPENING AREA IS 45% AREA OF EXTERIOR WALL: 968 SF TOTAL SIZE OF CURTAIN WALL OPENING: 218 SF ALLOWABLE OPENING AREA: 45% PROPOSED OPENING AREA: 22.5% LEVEL 1 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" CO-02 CO-02 SECURITY GATE IN CLOSED POSITION CBC TABLE 705.8, MAXIMUM AREA OF EXTERIOR WALL OPENINGS BASED ON FIRE SEPARATION DISTANCE AND DEGREE OF OPENING PROTECTION: SEPARATION DISTANCE FOR THE CURTAIN WALL OPENING ON LEVEL 1 IS BETWEEN 10 AND 15 FEET WITH UNPROTECTED, SPRINKLERED PROTECTION, THE ALLOWABLE OPENING AREA IS 45%. SEPARATION DISTANCE FOR THE CURTAIN WALL OPENING ON LEVEL 2 IS BETWEEN 3 AND 5 FEET WITH UNPROTECTED, SPRINKLERED PROTECTION, THE ALLOWABLE OPENING AREA IS 15%. SEPARATION DISTANCE FOR THE CURTAIN WALL OPENING ON LEVEL 2 IS BETWEEN 5 AND 10 FEET WITH UNPROTECTED, SPRINKLERED PROTECTION, THE ALLOWABLE OPENING AREA IS 25%. AREA OF EXTERIOR WALL: 332 SF TOTAL SIZE OF WINDOW OPENINGS: 45 SF ALLOWABLE OPENING AREA: 15% PROPOSED OPENING AREA: 13.5% LEVEL 2 AREA OF EXTERIOR WALL: 503 SF TOTAL SIZE OF DOOR OPENINGS: 114 SF ALLOWABLE OPENING AREA: 45% PROPOSED OPENING AREA: 22.7% LEVEL 1 0 TO LESS THAN 3 FEET FIRE SEPARATION DISTANCE: 3 TO LESS THAN 5 FEET FIRE SEPARATION DISTANCE: 5 TO LESS THAN 10 FEET FIRE SEPARATION DISTANCE: AREA OF EXTERIOR WALL: 372 SF TOTAL SIZE OF WINDOW OPENINGS: 13 SF ALLOWABLE OPENING AREA: 25% PROPOSED OPENING AREA: 3.5% LEVEL 2 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:19:22 AM 2308 CODE ANALYSIS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 G0.4.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 25 No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 3/16" = 1'-0"1BUILDING B LEVEL 2 CODE ANALYSIS PLAN 3/16" = 1'-0"2BUILDING A NORTH ELEVATION - ALLOWABLE OPENING AREA 3/16" = 1'-0"3BUILDING B SOUTH ELEVATION 01 - ALLOWABLE OPENING AREA6 6 6 WHEEL STOP 17 INCH X 22 INCH ACCESSIBILITY SIGN PER SEC. 11B-502.8.1. SEE DETAIL 3/A0.5 PEDESTRIAN ROUTE 18'-0" MIN. 9'-0" MIN. STRIPES AT 36" ON CENTER PER SEC 11B-502.3.3 5' - 0" MIN. AT TYP. ACCESSIBLE PARKING STALL 8'-0 MIN. AT VAN ACCESSIBLE PARKING STALLWITHIN THE LOADING AND UNLOADING ACCESS AISLE PAINT THE WORDS "NO PARKING" IN 12" HIGH LETTERS MIN. IN WHITE COLOR PER SEC 11B-502.3.3 NO PARKING TYP. PAVEMENT SYMBOL PER SEC 11B-502.3.3 AND 11B-703.7.2.1 DIMENSION TO CENTERLINE OF STRIPE TYP. 3' - 0" 3' - 0" G0.5.2 13 1 1/2" WALL 1 1/4" TO 1 1/2" NOMINAL DIAMETER 34" MAX. 29" MIN. 27 MIN. 9" MIN. 6" MAX.8" MIN. 17" MIN. 17" MIN. TO CENTERLINE 18" MIN. 30" MIN. 48" MIN. 19" MAX. SIDE ELEVATION PLAN VIEW TOE CLEARANCE 12" MIN.12" MIN. 5' - 0" 5' - 0"60" DIA. T-SHAPED SPACE FOR 180° TURNS60" DIAMETER SPACE 32" MIN. 24" MAX. 36" MIN. MINIMUM CLEAR WIDTH FOR SINGLE WHEELCHAIR MINIMUM CLEAR WIDTH FOR TWO WHEELCHAIRS 60" OR LONGER 60" MIN. PLAN OF "HI-LOW" DRINKING FOUNTAIN 18"-19" 9" MIN. 27" MIN. 36" MAX. KNEE CLEARANCE 8" MIN. TOE DEPTH 6" MAX. 17" MIN. DEPTH EQUIPMENT PERMITTED IN SHADED AREA SPOUT HEIGHT AND KNEE CLEARANCE AT DRINKING FOUNTAINS FIGURE 11B-305.7.1 MANEUVERING CLEARANCE IN AN ALCOVE, FORWARD APPROACH 36" MIN. X > 2 4 " NOTE: IF X = 18"MIN. ALCOVE DEPTH, THEN Y = 32" MIN. IF ALCOVE DEPTH (X) IS GREATER THAN 24". THEN ALCOVE WIDTH (Y) MUST BE MINIMUM OF 36" CLEAR. 48" MIN. 5" MAX.15" MIN. Y EQ EQ X Y EQ EQ X DRINKING FOUNTAIN SPOUT LOCATION FIGURE 11B-602.5 GRAB BAR MOUNTING LOCATION AT DRINKING FOUNTAINS AS FAR AS THE DRIKING FOUNTAIN 6" MAX. 34"-38" NOTE: EXTERIOR STAIRS ALL TREADS ARE TO HAVE WARNING STRIPES PER SEC. 11B-504.4 * ROUNDED NOSING WARNING STRIPING AND HANDRAIL EXTENSIONS 11" MIN. 1.5" MAX. FLUSH RISER 1.25" MAX. RADIUS 60° ANGLED NOSING 1.25" MAX. RADIUS 60° 34"- 38" WIDTH MIN. 12" PLUS TREAD T 34"-38" 2" MIN. - 4" MAX. 1" MAX. 12" MIN. 34"-38" T= TREAD WIDTH 12" MIN. 34"-38" 12" MIN. GUIDE RAIL CENTERED AT 3" +/-1" HIGH GUIDE RAIL DETAIL GUIDE RAIL HANDRAIL & CURB 34"-38" 48" MIN. CLEAR DESIGN TO SUIT 3" +/-1" HIGH WHEEL CHAIR WHEEL GUIDE DETAIL 18" MIN. INTERIOR 24" MIN. EXTERIOR 60" MIN. DOOR WIDTH PLUS 42" WALKING PERPENDICULAR TO A WALL 80" MIN. 4" MAX. THAN 27" WHEN HIGHER WALKING PARALLEL TO A WALL ANY AMOUNT 27" MAX. 27" MAX. CANE RANGE 33" - 36" 17" - 18" *REAR GRAB BAR ALLOWED AT 36" A.F.F AT TANK-TYPE TOILET REAR WALL ELEVATION 12" MIN.24" MIN. GRAB BAR 36" MIN. TOP OF GRAB BAR GRIPPING SURFACE 12" MAX. GRAB BAR 42" MIN. 54" MIN.ALL DISPENSERS 40" MAX. TO HIGHEST OPERABLE PART 19" MIN. 17" - 19" 33" - 36" SIDE WALL ELEVATION 7"-9" 24" MIN. 40 " M A X . FREE-STANDING OVERHANGING OBJECTS ELEVATIONPLAN OVERHEAD HAZARDS 27" . 80" . PROTECT SHADED AREA FROM CROSS-TRAFFIC CANE DETECTION AREA GREATER THAN 12" GREATER THAN 12" FLUSH ACTIVATOR ON WIDE SIDE 1' - 6" CENTERLINE OF FIXTURE 18" MIN. 28" MIN 12 " MAX. 24" MIN. 18" MIN. CLEAR 32" MIN. DIA. CLEAR 60" MIN TO EDGE OF WATER CLOSET 1' - 6"FLUSH ACTIVATOR ON WIDE SIDE 18" MIN.32" MIN. 60" MIN. 24" MIN. 48" MIN. CLEAR 32" MIN. ACESSIBLE WATER CLOSET COMPARTMENT WITHIN A MULTIPLE-ACCOMMODATION TOILET FACILITY PLAN 48" MIN CLEAR54" MIN. 60" MIN 12" MAX. 54" MIN. 4" MAX 24" MIN. AMBULATORY ACCESSIBLE TOLIET COMPARTMENT WITHIN A MULTIPLE-ACCOMMODATION TOILET FACILITY 12" MAX. 54" MIN. 60" MIN. 17" - 19" 44" MIN. 35" - 37" 12" MAX. 54" MIN. 4" MAX. 60" MIN. 18" MIN. PULL SIDE FRONT APPROACH CONDITIONS *ADD 6 INCHES AT EXTERIOR SIDE OF EXTERIOR DOOR HINGE SIDE APPROACH CONDITIONS LATCH SIDE APPROACH CONDITIONS PUSH SIDE 44" MIN. 24" MIN. PUSH SIDE 24" MIN. 48" MIN. DOOR PROVIDED WITH CLOSER PULL SIDE 24" MIN. 60" MIN. 48" MIN. PUSH SIDE 48" MIN. 12" MIN. PUSH SIDE DOOR PROVIDED WITH BOTH CLOSER AND LATCH 36" MIN. 60" MIN. PULL SIDE PUSH SIDE 22" MIN. 44" MIN. PUSH SIDE 22" MIN. 48" MIN. DOOR PROVIDED WITH BOTH CLOSER AND LATCH 90.00° 32" MIN. HINGED DOOR 32" MIN. SLIDING DOOR FOLDING DOOR 32" MIN. NOTES: 1. DOORS SHALL BE READILY OPENABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE OR EFFORT. 2. DOOR HANDLES, PULLS, LATCHES, LOCKS AND OTHER OPERATING DEVICES SHALL BE INSTALLED 34" MIN AND 48" MAX ABOVE THE FINISHED FLOOR. 914 36" MIN. 2032 80" MIN. 1372 54" MIN. 1067 42" MIN. 1295 51" MIN. 1372 54" MIN. 914 36" MIN. 1372 54" MIN. 1295 51" MIN. 2032 80" MIN. 1727 68" MIN. 1524 60" MIN. 1524 60" MIN. 914 36" MIN. (B) SIDE (OFF-CENTERED) DOOR(A) CENTERED DOOR (D) ANY DOOR LOCATION(C) ANY DOOR LICATION PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:19:28 AM 2308 ADA DETAILS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 G0.5.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/4" = 1'-0"1SINGLE AND VAN ACCESSIBLE PARKING 6" = 1'-0"2GRAB BAR SECTION 1/4" = 1'-0"3KNEE CLEARANCE AT ACCESSIBLE SINK 1/4" = 1'-0"6WHEEL CHAIR TURNAROUND 1/4" = 1'-0"7DRINKING FOUNTAIN 1/2" = 1'-0"8WARNING STRIPING AND HANDRAIL EXTENSIONS 1/4" = 1'-0"9RAMPS AND SIDEWALKS 1/4" = 1'-0"10LANDNG AT DOOR 1/4" = 1'-0"11PROTRUDING OBJECTS 1/4" = 1'-0"5OVERHANG AND OVERHEAD HAZARDS 1/4" = 1'-0"4SINGLE ACCOMMODATION TOILET FACILITY ACCESSIBILITY NOTES APPLICATION AND ADMINISTRATION 1. PUBLIC ACCOMMODATIONS SHALL MAINTAIN IN OPERABLE WORKING CONDITION THOSE FEATURES OF FACILITIES AND EQUIPMENT THAT ARE REQUIRED TO BE ACCESSIBLE TO AND USEABLE BY PERSONS WITH DISABILITIES. ISOLATED OR TEMPORARY INTERRUPTIONS IN SERVICE OR ACCESSIBILITY DUE TO MAINTENANCE OR REPAIRS SHALL BE PERMITTE D. §11B 108 FLOOR OR GROUND SURFACES 1. FLOOR AND GROUND SURFACES SHALL BE STABLE, FIRM, AND SLIP RESISTANT. §11B-302.1 2. CARPET OR CARPET TILE SHALL BE SECURELY ATTACHED AND SHALL HAVE A FIRM CUSHION, PAD, OR BACKING OR NO CUSHION OR PAD. CARPET OR CARPET TILE SHALL HAVE A LEVEL LOOP, TEXTURED LOOP, LEVEL CUT PILE, OR LEVEL CUT/UNCUT PILE TEXTURE. PILE HEIGHT SHALL BE ½ INCH MAXIMUM. §11B-302.2, FIGURE 11B-302.2 CHANGES IN LEVEL 3. VERTICAL CHANGES IN LEVEL FOR FLOOR OR GROUND SURFACES MAY BE ¼ INCH HIGH MAXIMUM AND WITHOUT EDGE TREATMENT. CHANGES IN LEVEL GREATER THAN ¼ INCH AND NOT EXCEEDING ½ INCH IN HEIGHT SHALL BE BEVELED WITH A SLOPE NOT STEEPER THAN 1:2. § 11B-303, FIGURES 11B-303.2 & 11B-303.3 4. CHANGES IN LEVEL GREATER THAN ½ INCH IN HEIGHT SHALL BE RAMPED AND SHALL COMPLY WITH THE REQUIREMENTS OF 11B-405 RAMPS OR 11B-406 CURB RAMPS AS APPLICABLE. §11B-303 5. ABRUPT CHANGES IN LEVEL EXCEEDING 4 INCHES IN A VERTICAL DIMENSION BETWEEN WALKS, SIDEWALKS OR OTHER PEDESTRIAN WAYS AND ADJACENT SURFACES OR FEATURES SHALL BE IDENTIFIED BY WARNING CURBS AT LEAST 6 INCHES IN HEIGHT ABOVE THE WALK OR SIDEWALK SURFACE OR BY GUARDS OR HANDRAILS WITH A GUIDE RAIL CENTERED 2 INCHES MINIMUM AND 4 INCHES MAXIMUM ABOVE THE SURFACE OF THE WALK OR SIDEWALK. THESE REQUIREMENTS DO NOT APPLY BETWEEN A WALK OR SIDEWALK AND AN ADJACENT STREET OR DRIVEWAY. §11B-303.5 DOORS, DOORWAYS, AND GATES 3. DOORS, DOORWAYS, AND GATES PROVIDING USER PASSAGE SHALL BE PROVIDED IN ACCORDANCE WITH 11B-206.5 DOORS, DOORWAYS, AND GATES. §11B-206.5 4. DOORS, DOORWAYS AND GATES THAT ARE PART OF AN ACCESSIBLE ROUTE SHALL COMPLY WITH 11B-404 DOORS, DOORWAYS, AND GATES. §11B-404.1 5. DOOR OPENINGS SHALL PROVIDE A CLEAR WIDTH OF 32 INCHES MINIMUM. CLEAR OPENINGS OF DOORWAYS WITH SWINGING DOORS SHALL BE MEASURED BETWEEN THE FACE OF THE DOOR AND THE STOP, WITH THE DOOR OPEN 90 DEGREES. OPENINGS MORE THAN 24 INCHES DEEP SHALL PROVIDE A CLEAR OPENING OF 36 INCHES MINIMUM. THERE SHALL BE NO PROJECTIONS INTO THE REQUIRED CLEAR OPENING WIDTH LOWER THAN 34 INCHES ABOVE THE FINISH FLOOR OR GROUND. PROJECTIONS INTO THE CLEAR OPENING WIDTH BETWEEN 34 INCHES AND 80 INCHES ABOVE THE FINISH FLOOR OR GROUND SHALL NOT EXCEED 4 INCHES. §11B-404.2.3 6. SWINGING DOORS AND GATES SHALL HAVE MANEUVERING CLEARANCES COMPLYING WITH TABLE 11B- 404.2.4.1. §11B 404.2.4.1 7. DOORWAYS LESS THAN 36 INCHES WIDE WITHOUT DOORS OR GATES, SLIDING DOORS, OR FOLDING DOORS SHALL HAVE MANEUVERING CLEARANCES COMPLYING WITH TABLE 11B-404.2.4.2. §11B-404.2.4.2 8. MANEUVERING CLEARANCES FOR FORWARD APPROACH SHALL BE PROVIDED WHEN ANY OBSTRUCTION WITHIN 18 INCHES OF THE LATCH SIDE AN INTERIOR DOORWAY, OR WITHIN 24 INCHES OF THE LATCH SIDE OF AN EXTERIOR DOORWAY, PROJECTS MORE THAN 8 INCHES BEYOND THE FACE OF THE DOOR, MEASURED PERPENDICULAR TO THE FACE OF THE DOOR OR GATE. §11B 404.2.4.3 9. THRESHOLDS, IF PROVIDED AT DOORWAYS, SHALL BE ½ INCH HIGH MAXIMUM. RAISED THRESHOLDS AND CHANGES IN LEVEL AT DOORWAYS SHALL COMPLY WITH 11B-302 FLOOR OR GROUND SURFACES AND 11B- 303 CHANGES IN LEVEL. §11B 404.2.5 10. HANDLES, PULLS, LATCHES, LOCKS, AND OTHER OPERABLE PARTS ON DOORS AND GATES SHALL COMPLY WITH 11B-309.4 OPERATION. OPERABLE PARTS OF SUCH HARDWARE SHALL BE 34 INCHES MINIMUM AND 44 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. WHERE SLIDING DOORS ARE IN THE FULLY OPEN POSITION, OPERATING HARDWARE SHALL BE EXPOSED AND USABLE FROM BOTH SIDES. §11B-404.2.7 11. THE FORCE FOR PUSHING OR PULLING OPEN A DOOR OR GATE OTHER THAN FIRE DOORS SHALL BE AS FOLLOWS: §11B-404.2.9 A. INTERIOR HINGED DOORS AND GATES: 5 POUNDS MAXIMUM. B. SLIDING OR FOLDING DOORS: 5 POUNDS MAXIMUM. C. REQUIRED FIRE DOORS: THE MINIMUM OPENING FORCE ALLOWABLE BY THE APPROPRIATE ADMINISTRATIVE AUTHORITY, NOT TO EXCEED 15 POUNDS. D. EXTERIOR HINGED DOORS: 5 POUNDS MAXIMUM. 12. SWINGING DOOR AND GATE SURFACES WITHIN 10 INCHES OF THE FINISH FLOOR OR GROUND MEASURED VERTICALLY SHALL HAVE SMOOTH SURFACE ON THE PUSH SIDE EXTENDING THE FULL WIDTH OF THE DOOR OR GATE. PARTS CREATING HORIZONTAL OR VERTICAL JOINTS IN THESE SURFACES SHALL BE WITHIN 1/16 INCH OF THE SAME PLANE AS THE OTHER AND BE FREE OF SHARP OR ABRASIVE EDGES. CAVITIES CREATED BY ADDED KICK PLATES SHALL BE CAPPED. §11B-404.2.10 DRINKING FOUNTAINS 1. DRINKING FOUNTAINS SHALL COMPLY WITH SECTIONS 11B-307 PROTRUDING OBJECTS AND 11B-602 GENERAL REQUIREMENTS. §11B-602.1 2. UNITS SHALL HAVE A CLEAR FLOOR OR GROUND SPACE COMPLYING WITH SECTION 11B-305 CLEAR FLOOR OR GROUND SPACE POSITIONED FOR A FORWARD APPROACH AND CENTERED ON THE UNIT. KNEE AND TOE CLEARANCE COMPLYING WITH SECTION 11B-306 KNEE AND TOE CLEARANCE SHALL BE PROVIDED. §11B-602.2 3. SPOUT OUTLETS SHALL BE 36 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. § 11B-602.4 4. THE SPOUT SHALL BE LOCATED 15 INCHES MINIMUM FROM THE VERTICAL SUPPORT AND 5 INCHES MAXIMUM FROM THE FRONT EDGE OF THE UNIT, INCLUDING BUMPERS. §11B-602.5 5. THE SPOUT SHALL PROVIDE A FLOW OF WATER 4 INCHES HIGH MINIMUM AND SHALL BE LOCATED 5 INCHES MAXIMUM FROM THE FRONT OF THE UNIT. THE ANGLE OF THE WATER STREAM SHALL BE MEASURED HORIZONTALLY RELATIVE TO THE FRONT FACE OF THE UNIT. WHERE SPOUTS ARE LOCATED LESS THAN 3 INCHES FROM THE FRONT OF THE UNIT, THE ANGLE OF THE WATER STREAM SHALL BE 30 DEGREES MAXIMUM. WHERE SPOUTS ARE LOCATED BETWEEN 3 INCHES AND 5 INCHES MAXIMUM FROM THE FRONT OF THE UNIT, THE ANGLE OF THE WATER STREAM SHALL BE 15 DEGREES MAXIMUM. §11B-602.6 6. SPOUT OUTLETS OF DRINKING FOUNTAINS FOR STANDING PERSONS SHALL BE 38 INCHES MINIMUM AND 43 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. §11B-602.7 7. WALL AND POST-MOUNTED CANTILEVERED DRINKING FOUNTAINS SHALL BE 18 INCHES MINIMUM AND 19 INCHES MAXIMUM IN DEPTH. §11B-602.8 8. ALL DRINKING FOUNTAINS SHALL EITHER BE LOCATED COMPLETELY WITHIN ALCOVES, POSITIONED COMPLETELY BETWEEN WING WALLS, OR OTHERWISE POSITIONED SO AS NOT TO ENCROACH INTO PEDESTRIAN WAYS. THE PROTECTED AREA WITHIN SUCH A DRINKING FOUNTAIN IS LOCATED SHALL BE 32 INCHES WIDE MINIMUM AND 18 INCHES DEEP MINIMUM, AND SHALL COMPLY WITH SECTION 11B-305.7 MANEUVERING CLEARANCE. WHEN USED, WING WALLS OR BARRIERS SHALL PROTECT HORIZONTALLY AT LEAST AS FAR AS THE DRINKING FOUNTAIN AND TO WITHIN 6 INCHES VERTICALLY FROM THE FLOOR OR GROUND SURFACE. § 11B-602.9 TOILET AND BATHING ROOM CLEARANCES 9. DOORS TO UNISEX TOILET ROOMS AND UNISEX BATHING ROOMS SHALL HAVE PRIVACY LATCHES. §11B-213.2.1 10. MIRRORS LOCATED ABOVE THE LAVATORIES OR COUNTERTOPS SHALL BE INSTALLED WITHIN THE BOTTOM EDGE OF THE REFLECTING SURFACE 40 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. MIRRORS NOT LOCATED ABOVE THE LAVATORIES OR COUNTERTOPS SHALL BE INSTALLED WITH THE BOTTOM EDGE OF THE REFLECTING SURFACE 35 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. §11B-603.3 11. COAT HOOKS SHALL BE LOCATED WITHIN ONE OF THE REACH RANGES SPECIFIED IN SECTION 11B-308. SHELVES SHALL BE LOCATED 40 INCHES MINIMUM AND 48 INCHES MAXIMUM ABOVE THE FINISH FLOOR. MEDICINE CABINETS SHALL BE LOCATED WITH A USABLE SHELF NO HIGHER THAN 44 INCHES MAXIMUM ABOVE THE FINISH FLOOR. §11B-603.4 12. WHERE TOWEL OR SANITARY NAPKIN DISPENSERS, WASTE RECEPTACLES, OR OTHER ACCESSORIES ARE PROVIDED IN TOILET FACILITIES, AT LEAST ONE OF EACH TYPE SHALL BE LOCATED ON AN ACCESSIBLE ROUTE. ALL OPERABLE PARTS, INCLUDING COIN SLOTS, SHALL BE 40 INCHES MAXIMUM ABOVE THE FINISH FLOOR. BABY CHANGING STATIONS ARE NOT REQUIRED TO COMPLY WITH SECTION 11B-603.5 (SEE EXCEPTION) §11B-603.5 WATER CLOSETS AND TOILET COMPARTMENTS 13. FLUSH CONTROLS SHALL BE HAND OPERATED OR AUTOMATIC. HAND OPERATED FLUSH CONTROLS SHALL COMPLY WITH SECTION 11B-309.4 OPERATION EXCEPT THEY SHALL BE LOCATED 44 INCHES MAXIMUM ABOVE THE FLOOR. FLUSH CONTROLS SHALL BE LOCATED ON THE OPEN SIDE OF THE WATER CLOSET EXCEPT IN AMBULATORY ACCESSIBLE COMPARTMENTS COMPLYING WITH SECTION 11B-604.8.2 AMBULATORY ACCESSIBLE COMPARTMENTS. § 11B-604.6 14. TOILET PAPER DISPENSERS SHALL COMPLY WITH SECTION 11B-309.4 OPERATION AND SHALL BE 7 INCHES MINIMUM AND 9 INCHES MAXIMUM IN FRONT OF THE WATER CLOSET MEASURED TO THE CENTERLINE OF THE DISPENSER. THE OUTLET OF THE DISPENSER SHALL BE BELOW THE GRAB BAR, 19 INCHES MINIMUM ABOVE THE FINISH FLOOR AND SHALL NOT BE LOCATED BEHIND THE GRAB BARS. DISPENSERS SHALL NOT BE OF A TYPE THAT CONTROL DELIVERY OR THAT DOES NOT ALLOW CONTINUOUS PAPER FLOW. §11B-604.71/4" = 1'-0"12MANEUVERING CLEARANCES AT DOORS 1/4" = 1'-0"15CLEAR WIDTH OF DOORWAYS 25 No.Description Date 6 PC SUBMITTAL 03 04/28/25 6 6 1/4" = 1'-0"16ELEVATOR CAR DIMENSION 6 SYMBOL PROPORTIONS DISPLAY CONDITIONS INTERNATIONAL TDD SYMBOL INTERNATIONAL SYMBOL OF ACCESS FOR HEARING LOSS 6" VARIES TEXT 3" HIGH LETTERS COLOR: CONTRASTING DIRECTIONAL SIGN 3" MIN CAP HEIGHT COLOR: CONTRASTING COLOR: WHITE NOTE: CHARACTERS AND BACKGROUND ARE EGGSHELL PAINTED NOTE: SIMILAR TO NON- ACCESSIBLE RESTROOMS NOTE: INACCESSIBLE ENTRANCES SHALL HAVE DIRECTIONAL SIGNAGE TO INDICATE THE ROUTE TO THE NEAREST ACCESSIBLE ENTRANCE 3" INTERNATIONAL SYMBOL OF ACCESSIBILITY COLOR: BLUE RESERVED PARKING UNAUTHORIZED VEHICLES PARKED IN DESIGNATED ACCESSIBLE SPACES NOT DISPLAYING DISTINGUISHING PLACARDS OR SPECIAL LICENSE PLATES ISSUED FOR PERSONS WITH DISABILITIES WILL BE TOWED AWAY AT THE OWNER'S EXPENSE. TOWED VEHICLES MAY BE RECLAIMED AT: OR BY TELEPHONING ------------ 1' - 5" 1' - 10" 1' - 6" 1' - 0" VAN ACCESSIBLE 80 " m i n . 3" WHERE APPLICABLE AT PUSH SIDE -4 1/2" AT LATCH SIDE TACTILE EXIT SIGN ON WALL AT LATCH SIDE OF DOOR 48" MIN EXIT STAIR/ RAMP DOWN EXIT STAIR/ RAMP DOWN EXIT EXIT 9" 3 " 4 " 9" 1/2" MARINE PLYWOOD, FINISHED WITH 3 COATS OF WTER BASED POLYURETHANE, SEMI GLOSS WITH 3M ADHESIVE FILM 1/32" RAISED GRAVOTAC(COLOR 37058) OR SIMILAR, 80PT FUTURA MD BT, TRACKING 150 1/16" BALLS FOR BRAILLE PRESS FIT ..... 48" MIN ABOVE THE FINISH FLOOR MEASURED FROM THE BASELINE OF THE BRAILLE BUILDING BUILDING ID: 9" TEXT TYPE: SANS-SERIF, UPPERCASE, RAISED 1/32" MINIMUM ABOVE BACKGROUND SURFACE HEIGHT 5/8" MINIMUM, 2" MAXIMUM, 9" FOR BUILDING IDENTIFICATION LETTER PROPORTIONS: WIDTH-TO-HEIGHT RATIO OF BETWEEN 3:5 AND 1:1, AND STROKE WIDTH-TO-HEIGHT RATIO BETWEEN 1:5 AND 1:10. INTERNATIONAL SYMBOL OF ACCESSIBILITY PER DTL. 2 / A0.6 BACKGROUND MATERIAL: EGGSHELL OR MATTE FINISH, CONTRASTING WITH WALL COLOR SYMBOLS AND CHARACTERS: EGGSHELL OR MATTE FINISH, CONTRASTING WITH BACKGROUND COLOR. G. H. EXIT RAMP UP EXIT RAMP UP 6" MIN. 1/2" MAX. 3/8" MIN. TO 1/2" MIN 48" MIN. 60" MAX. BACKGROUND MATERIAL: EGGSHELL OR MATTE FINISH, CONTRASTING WITH WALL COLOR SYMBOLS AND CHARACTERS: EGGSHELL OR MATTE FINISH, CONTRASTING WITH BACKGROUND COLOR. TEXT TYPE: SANS-SERIF, UPPERCASE, RAISED 1/32" MINIMUM ABOVE BACKGROUND SURFACE HEIGHT 5/8" MINIMUM, 2" MAXIMUM, 9" FOR BUILDING IDENTIFICATION LETTER PROPORTIONS: WIDTH-TO- HEIGHT RATIO OF BETWEEN 3:5 AND 1:1, AND STROKE WIDTH-TO-HEIGHT RATIO BETWEEN 1:5 AND 1:10. 6" MIN. 6" MIN.EXIT EXIT 1/2" MAX. 3/8" MIN. TO 1/2" MIN 60" MAX. 48" MIN. BACKGROUND MATERIAL: EGGSHELL OR MATTE FINISH, CONTRASTING WITH WALL COLOR SYMBOLS AND CHARACTERS: EGGSHELL OR MATTE FINISH, CONTRASTING WITH BACKGROUND COLOR. TEXT TYPE: SANS-SERIF, UPPERCASE, RAISED 1/32" MINIMUM ABOVE BACKGROUND SURFACE HEIGHT 5/8" MINIMUM, 2" MAXIMUM, 9" FOR BUILDING IDENTIFICATION LETTER PROPORTIONS: WIDTH-TO-HEIGHT RATIO OF BETWEEN 3:5 AND 1:1, AND STROKE WIDTH- TO-HEIGHT RATIO BETWEEN 1:5 AND 1:10.EXIT 3" 6" MIN. BACKGROUND MATERIAL: EGGSHELL OR MATTE FINISH, CONTRASTING WITH WALL COLOR SYMBOLS AND CHARACTERS: EGGSHELL OR MATTE FINISH, CONTRASTING WITH BACKGROUND COLOR. DIRECTIONAL SIGN, 3" MIN CAP HEIGHT, COLOR: CONTRASTING 200 MAX. CAPACITY 5/8" 1" 1" 1" 5/8" 6" MIN. 6" MIN. BACKGROUND MATERIAL: EGGSHELL OR MATTE FINISH, CONTRASTING WITH WALL COLOR SYMBOLS AND CHARACTERS: EGGSHELL OR MATTE FINISH, CONTRASTING WITH BACKGROUND COLOR. TEXT TYPE: SANS-SERIF, UPPERCASE, RAISED 1/32" MINIMUM ABOVE BACKGROUND SURFACE HEIGHT 5/8" MINIMUM, 2" MAXIMUM, 9" FOR BUILDING IDENTIFICATION LETTER PROPORTIONS: WIDTH-TO- HEIGHT RATIO OF BETWEEN 3:5 AND 1:1, AND STROKE WIDTH-TO-HEIGHT RATIO BETWEEN 1:5 AND 1:10. EXIT STAIR DOWN STAIR BACKGROUND MATERIAL: EGGSHELL OR MATTE FINISH, CONTRASTING WITH WALL COLOR SYMBOLS AND CHARACTERS: EGGSHELL OR MATTE FINISH, CONTRASTING WITH BACKGROUND COLOR. TEXT TYPE: SANS-SERIF, UPPERCASE, RAISED 1/32" MINIMUM ABOVE BACKGROUND SURFACE HEIGHT 5/8" MINIMUM, 2" MAXIMUM, 9" FOR BUILDING IDENTIFICATION LETTER PROPORTIONS: WIDTH-TO-HEIGHT RATIO OF BETWEEN 3:5 AND 1:1, AND STROKE WIDTH-TO-HEIGHT RATIO BETWEEN 1:5 AND 1:10. SEE SPECIFICATIONS SECTION 10431 PER CALIFORNIA CONTRACTED GRADE II BRAILLE C. 6" MIN. 6" MIN. A4 A4 6" MIN. 6" MIN. 1/2" MAX. 3/8" MIN. TO 1/2" MIN. 48" MIN. 60" MAX. SEE SPECIFICATIONS SECTION 10431 PER CALIFORNIA CONTRACTED GRADE II BRAILLE BACKGROUND MATERIAL: EGGSHELL OR MATTE FINISH, CONTRASTING WITH WALL COLOR SYMBOLS AND CHARACTERS: EGGSHELL OR MATTE FINISH, CONTRASTING WITH BACKGROUND COLOR. TEXT TYPE: SANS-SERIF, UPPERCASE, RAISED 1/32" MINIMUM ABOVE BACKGROUND SURFACE HEIGHT 5/8" MINIMUM, 2" MAXIMUM, 9" FOR BUILDING IDENTIFICATION LETTER PROPORTIONS: WIDTH-TO-HEIGHT RATIO OF BETWEEN 3:5 AND 1:1, AND STROKE WIDTH-TO-HEIGHT RATIO BETWEEN 1:5 AND 1:10. A. D. E. B. F. INTERNATIONAL SYMBOL OF ACCESSIBILITY PER DTL. 2 / A0.6 SEE SPECIFICATIONS SECTION 10431 PER CALIFORNIA CONTRACTED GRADE II BRAILLE SEE SPECIFICATIONS SECTION 10431 PER CALIFORNIA CONTRACTED GRADE II BRAILLE 1. SEE FLOOR PLAN/DOOR SCHEDULE FOR SIGNAGE LOCATION. SEE 4 / A0.6 FOR ADDITIONAL INFORMATION ON SIGNAGE. 2. ROOM NAMES/NUMBERS TO BE SPECIFIED BY THE DISTRICT U.O.N. NOTES: 6" MIN. ROOM NAME A4 ROOM NAME 60" MAX. 48" MIN. 1/2" MAX. 3/8" MIN. TO 1/2" MIN INTERNATIONAL SYMBOL OF ACCESSIBILITY PER DTL. 2 / A0.6 BACKGROUND MATERIAL: EGGSHELL OR MATTE FINISH, CONTRASTING WITH WALL COLOR SYMBOLS AND CHARACTERS: EGGSHELL OR MATTE FINISH, CONTRASTING WITH BACKGROUND COLOR. ROOM NAME: 1" (PER DISTRICT) BUILDING & ROOM NO: 2" SEE SPECIFICATIONS SECTION 10431 PER CALIFORNIA CONTRACTED GRADE II BRAILLE BACKGROUND MATERIAL: FINISH & COLOR: NON-GLARE FINISH,CONTRASTING WITH WALL COLORMAXIMUM OCCUPANTS 1,234 * MAXIMUM OCCUPANTS 1,234 SEATING 575 DINING* * SYMBOLS AND CHARACTERS: FINISH & COLOR: NON-GLARE FINISH, MINIMUM 70% CONTRAST WITH BACKGROUND COLOR. TEXT: LETTER TYPE: SANS SERIF, UPPERCASE, ARABIC NUMERALS HEIGHT: 1" LETTER PROPORTIONS: WIDTH-TO-HEIGHT RATIO BETWEEN 3:5 AND 1:1; STROKE WIDTH TO HEIGHT RATIO BETWEEN 1:5 AND 1:10 WHERE ROOM HAS MORE THAN ONE USE, LIST THE MAXIMUM OCCUPANTS FOR EACH USE. * LIST NUMBER OF OCCUPANTS BASED ON THE REQUIREMENTS OF CHAPTER 10, UNIFORM BUILDING CODE / CALIFORNIA BUILDING CODE; SEE SIGNAGE SCHEDULE IN SPECIFICATIONS. PROVIDE SIGNS WITH DIMENSIONS AS REQUIRED TO ACCOMMODATE THE REQUIRED INFORMATION AND TEXT SIZES INDICATED. POST OCCUPANT LOAD SIGN IN A CONSPICUOUS PLACE NEAR THE MAIN EXIT OR EXIT-ACCESS DOORWAY IN ASSEMBLY ROOMS. NOTE: THIS DETAIL ILLUSTRATES THE CRITERIA FOR OCCUPANT LOAD SIGNS. SEE SPECIFICATIONS FOR SPECIFIC SIGNAGE INFORMATION. AUDITORIUM (AUDITORIUM & SHOWROOM COMBINED) MAXIMUM OCCUPANT LOAD= 539 LOBBY MAXIMUM OCCUPANT LOAD=413 SHOWROOM MAXIMUM OCCUPANT LOAD= 253 4' - 6" EXIT ROUTE 7 1/4" 9" 3" CLEAR AREA 18" MIN. EVACUATION MAP AND TACTILE EXIT SIGN EXIT ROUTE EXIT ROUTE 9" 3 " 1/2" MARINE PLYWOOD, FINISHED WITH 3 COATS OF WTER BASED POLYURETHANE, SEMI GLOSS WITH 3M ADHESIVE FILM 1/32" RAISED GRAVOTAC(COLOR 37058) OR SIMILAR, 80PT FUTURA MD BT, TRACKING 150 1/16" BALLS FOR BRAILLE PRESS FIT 48" MIN TO THE BOTTOM OF BRAILLE EXIT ROUTE 7 1/4" 9" 3" CLEAR AREA 18" MIN. EVACUATION MAP AND TACTILE EXIT SIGN EMERGENCY EXIT PLAN 9" 7" 1 / 4 " 1/2" MARINE PLYWOOD, FINISHED WITH 3 COATS OF WTER BASED POLYURETHANE, SEMI GLOSS WITH 3M ADHESIVE FILM LASER ETCHED ON 1/2" MARINE PLYWOOD, LASER CUT DEPTH TO BE 1/32" LASER ETCHED ON 1/2" MARINE PLYWOOD, LASER CUT DEPTH TO BE 1/32" - PAINTED RED AT 'YOU ARE HERE' SYMBOL AND EXIT ROUTE LINE ... MIN. 5' - 0" ALL GENDER MULTI-USER RESTROOM EQ.EQ. ALL GENDER MULTI-USER RESTROOM FUTURA MD BT, 80PT EQUILATERAL TRIANGLE WITHIN 12" DIAMETER CIRCLE 1/32" RAISED GRAVOTAC OR EQUIVALENT TYPE ON PANTONE 425C COLORED RESIN PLAQUE FOR TRIANGLE - SET IN 12" DIAMETER WHITE CIRCLE 1/4" THICK COMBINED CIRCLE AND TRIANGLE SYMBOL VERTICES OF THE TRIANGLE SYMBOL LOCATED WITHIN 1/4" FROM THE EDGE OF THE CIRCLE ALL-GENDER MULTI-USER ..................... ALL-GENDER MULTI-USER 4' - 8" 48" MIN. 60" MAX. MIN. 5' - 0" FUTURA MD BT, 80PT 1/32" RAISED GRAVOTAC OR EQUIVALENT TYPE ON PANTONE 425C COLORED RESIN PLAQUE FOR RECTANGLE WITH WHITE OUT FOR SYMBOLS MEN MEN 1/16" BALLS FOR BRAILLE PRESS FIT MEN MEN WOMEN WOMEN UNISEX UNISEZ RESTROOMS RESTROOMS MEN HANDICAPPED ACCESSIBLE RESTROOM ON FIRST FLOOR MEN MEN 11" 3 1/2" 4' - 3" 11" WALL MOUNTED SIGNAGE TO BE LOCATED ON LATCH SIDE OF DOOR CLEAR OF DOOR-SWING, MOUNT AT 60" TO CENTERLINE OF SIGN FROM FLOOR UNISEX UNISEZ UNISEX UNISEZ 5' - 0" EQ.EQ. DOOR MOUNTED SIGNAGE (TYP.) NOTE: PICTOGRAMS AND/OR LETTERING ARE NOT REQUIRED ON DOOR-MOUNTED SIGNAGE 1 2 " 12" 1 2 " PANTONE 425C COLORED RESIN PLAQUE PANTONE 425C COLORED RESIN PLAQUE FOR TRIANGLE - SET IN 12" DIAMETER WHITE CIRCLE 78" MIN. EQ.EQ. SYMBOL TO BE PERMANENTLY ATTACHED AT EACH SIDE OF HOISTWAY DOOR FRAME OF ELEVATOR ELEVATOR 48" MIN. 60" MAX. INTERNATIONAL SYMBOL FOR EMERGENCY MEDICAL SERVICES: STAR OF LIFE BRAILLE TRANSLATION: MAIN RAISED STAR: 2" OD, ALL POINTS EQUAL LENGTH RAISED CHARACTERS: 2" BRAILLE TRANSLATION: CORRESPINDING THE CHARACTERS STAR AND CHARACTERS SHALL BE WHITE ON A BLACK BACKGROUND FLOOR DESIGNATION SIGNAGE . 3" WHERE APPLICABLE AT PUSH SIDE -4 1/2" AT LATCH SIDE INTERIOR ROOM IDENTIFICATION SIGN (TACTILE) - WHERE OCCURS 48" MIN ROOM 201 KOREMATSU 9" 3 " 1/2" MARINE PLYWOOD, FINISHED WITH 3 COATS OF WTER BASED POLYURETHANE, SEMI GLOSS WITH 3M ADHESIVE FILM 1/32" RAISED GRAVOTAC(COLOR 37058) OR SIMILAR, 80PT FUTURA MD BT, TRACKING 150 1/16" BALLS FOR BRAILLE PRESS FIT ..... 48" MIN ABOVE THE FINISH FLOOR MEASURED FROM THE BASELINE OF THE BRAILLE PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:19:33 AM 2308 ADA SIGNAGE DETAILS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 G0.5.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1" = 1'-0"8INTERNATIONAL ACCESSIBILITY SYMBOLS 3" = 1'-0"9ADA ACCESSIBLE DIRECTION SIGNAGE2 1 1/2" = 1'-0"13SINGLE AND VAN ACCESSIBLE PARKING 1/2" = 1'-0"3(SIGN TYPE A) EXIT SIGNAGE 3" = 1'-0"2ADA SIGNAGE & ROOM IDENTIFICATION SIGN2 1/2" = 1'-0"1ADA OCCUPANT LOAD SIGN2 1/2" = 1'-0"4(SIGN TYPE B) EXIT ROUTE SIGNAGE1 1/2" = 1'-0"5(SIGN TYPE C) EVACUATION MAP SIGNAGE1 1/2" = 1'-0"7(SIGN TYPE E) ALL GENDER RESTROOM SIGNAGE SIGNS AND IDENTIFICATION 1. WHERE A TACTILE SIGN IS PROVIDED AT A DOOR, THE SIGN SHALL BE LOCATED ALONGSIDE OF THE DOOR AT THE LATCH SIDE. [§11B-703.4.2 CBC] 2. SIGNS CONTAINING TACTILE CHARACTERS SHALL BE LOCATED SO THAT A CLEAR SPACE OF 18” MINIMUM BY 18” MINIMUM, CENTERED ON THE TACTILE CHARACTERS, IS PROVIDED BEYOND THE ARC OF ANY DOOR SWING BETWEEN THE CLOSED POSITION AND 45 DEGREE OPEN POSITION. [§11B-703.4.2 CBC] 3. TACTILE CHARACTERS ON SIGNS SHALL BE LOCATED 48”MINIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE, MEASURED FROM THE BASELINE OF THE LOWEST BRAILLE CELLS AND 60” MAXIMUM ABOVE THE FINISH FLOOR OR GROUND SURFACE, MEASURED FROM THE BASELINE OF THE HIGHEST LINE OF RAISED CHARACTERS. [§11B-703.4.1 CBC] 4. CHARACTER SHALL BE SELECTED FROM FONTS WHERE THE WIDTH OF THE UPPERCASE LETTER “O” IS 60% MINIMUM AND 110% MAXIMUM OF THE HEIGHT OF THE UPPERCASE LETTER “I”. [§ 11B-703.2.4 CBC] 5. CHARACTER HEIGHT MEASURED VERTICALLY FROM THE BASELINE OF THE CHARACTER SHALL BE 5/8” MINIMUM AND 2” MAXIMUM BASED ON THE HEIGHT OF THE UPPERCASE “I”. [§ 11B-703.2.5 CBC] 6. STROKE THICKNESS OF THE UPPERCASE LETTER “I” SHALL BE 15% OF THE MAXIMUM HEIGHT OF THE CHARACTER. [§11B-703.2.6 CBC] 7. CHARACTERS AND THEIR BACKGROUNDS SHALL HAVE A NON-GLARE FINISH. CHARACTERS SHALL CONTRAST WITH THEIR BACKGROUND, WITH EITHER LIGHT CHARACTERS ON A DARK BACKGROUND OR DARK CHARACTERS ON A LIGHT BACKGROUND. [§11B-703.5.1 CBC] 8. PICTOGRAMS AND THEIR FIELD SHALL HAVE A NON-GLARE FINISH. PICTOGRAMS SHALL CONTRAST WITH THEIR FIELD, WITH EITHER LIGHT PICTOGRAM ON A DARK FIELD OR DARK PICTOGRAM ON A LIGHT FIELD. [§11B-703.6.2 CBC] 9. SYMBOLS OF ACCESSIBILITY AND THEIR BACKGROUNDS SHALL HAVE A NON-GLARE FINISH. SYMBOLS OF ACCESSIBILITY SHALL CONTRAST WITH THEIR BACKGROUND, WITH EITHER LIGHT CHARACTERS ON A DARK BACKGROUND OR DARK CHARACTERS ON A LIGHT BACKGROUND. [§ 11B-703.7.1 CBC] 10. VISUAL CHARACTERS SHALL BE 40” MINIMUM ABOVE FINISH FLOOR OR GROUND. [§ 11B-703.5.6 CBC] 11. [§11B-703.2 & 11B-703.3 CBC] RAISED CHARACTERS AND SHALL COMPLY WITH THE FOLLOWING TO THE FOLLOWING: a. RAISED CHARACTERS SHALL BE 1/32" MINIMUM ABOVE THEIR BACKGROUND. AND SHALL BE SANS-SERIF UPPERCASE CHARACTERS ACCOMPANIED BY GRADE 2 BRAILLE. CHARACTERS SHALL NOT BE ITALIC, OBLIQUE, SCRIPT, HIGHLY DECORATIVE, OR OF OTHER UNUSUAL FORMS. b. CHARACTER HEIGHT MEASURED VERTICALLY FROM THE BASELINE OF THE CHARACTER SHALL BE 5/8" MINIMUM AND 2” MAXIMUM BASED ON THE HEIGHT OF AN UPPERCASE “I”. 12. PICTOGRAMS SHALL HAVE A FIELD HEIGHT OF 6” MINIMUM. CHARACTERS AND BRAILLE SHALL NOT BE LOCATED IN THE PICTOGRAM FIELD. [§11B-703.6.1 CBC] 13. PICTOGRAMS SHALL HAVE TEXT DESCRIPTORS LOCATED BELOW THE PICTOGRAM FIELD. [§ 11B-703.6.3 CBC] 14. [§11B-703.3 & TABLE 703.3.1 CBC] BRAILLE SHALL BE CONTRACTED (GRADE 2). BRAILLE DOTS SHALL BE CIRCULAR OR ROUNDED SHAPE AND COMPLY WITH THE FOLLOWING: a. DOT BASE DIAMETER SHALL BE 0.059” TO 0.063”. b. DISTANCE BETWEEN TWO DOTS IN THE SAME CELL SHALL BE 0.100” c. DISTANCE BETWEEN CORRESPONDING DOTS IN ADJACENT CELLS SHALL BE 0.300”. d. DOT HEIGHT SHALL BE 0.025” TO 0.037”. e. DISTANCE BETWEEN CORRESPONDING DOTS FROM ONE CELL DIRECTLY BELOW SHALL BE 0.395” TO 0.400”. 15. DOORWAYS LEADING TO MEN'S SANITARY FACILITIES SHALL BE IDENTIFIED BY AN EQUILATERAL TRIANGLE 1/4" THICK WITH EDGES 12" LONG AND A VERTEX POINTING UPWARD. WOMEN'S SANITARY FACILITIES SHALL BE IDENTIFIED BY A CIRCLE 1/4" THICK AND 12" IN DIAMETER. GEOMETRIC (CIRCLE & TRIANGLE) SYMBOLS ON SANITARY FACILITY DOORS SHALL BE CENTERED ON THE DOOR AT A HEIGHT OF 58”-60" AND THEIR COLOR AND CONTRAST SHALL BE DISTINCTLY DIFFERENT FROM THE COLOR AND CONTRAST OF THE DOOR. 1/2" = 1'-0"10(SIGN TYPE F) ADA RESTROOM SIGNAGE 1/2" = 1'-0"11(SIGN TYPE G) ADA RESTROOM DOOR SIGNAGE 1/2" = 1'-0"12(SIGN TYPE H) ELEVATOR SIGNAGE 25 No.Description Date 6 PC SUBMITTAL 03 04/28/25 1/2" = 1'-0"6(SIGN TYPE D) ROOM IDENTIFICATION SIGNAGE 66 6 8'-0" MIN. 5'-0" AFF APPROACH 15" FRONT APPROACH 15" FRONT APPROACH 2'-0" SIDE SIGN 9" BRAILLE LOCATE SIGN ON LATCH SIDE OF DOOR ROOM AND SPACE SIGNAGE SWITCH, STROBE, THERMOSTAT AND OUTLET 8'-0" MAXIMUM 1' - 0" 48" MAX. 8"6" SWITCH(S) OR DIMMER(S) GANG UNDER ONE PLATE THERMOSTAT WHERE OCCURS - CONFIRM W/ FURNITURE DRAWINGS OUTLET WHERE OCCURS STROBE WHERE OCCURS 1' - 0" 8'-0" MAXIMUM EQ. (TO CORNER) EQ. (TO CORNER) ALTERNATE: SET OFF CORNER ALTERNATE: CENTERED ON WALL CL CL 8'-0" MAXIMUM 48" MAX. 6"8" FINISHED OPENING STROBE WHERE OCCURS SWITCH(S) OR DIMMER(S) GANG UNDER ONE PLATE THERMOSTAT WHERE OCCURS SWITCH, STROBE, THERMOSTAT CL 8" 48" MAX. 8'-0" MAXIMUM SCHEDULED DOOR AND FRAME STROBE WHERE OCCURS CARD READER / EGRESS BUTTON THERMOSTAT WHERE OCCURS DOOR LEVER CARD READER/EGRESS BUTTON @ DOOR CL ACCESSIBLE 4'-0" TYPICAL 5'-6" SCHEDULED DOOR AND FRAME COAT HOOK, ON INSIDE FACE OF DOOR MOUNTING HEIGHT AT COAT HOOK COAT HANGERS COAT ROD AND SHELF COAT HOOK STRIP 6" ACCESSIBLE 3' - 4" 5' - 6" ROD 5' - 6" SHELF ELECTRICAL DEVICES AT MILLWORK ACCESSIBLE COUNTER WITH SIDE REACH OVER COUNTER TOP FRONT FRONT SIDE 48" MAX. 2' - 10" 1' - 6" 3' - 0" 1' - 6" 7' - 0" ELECTRIC OR DATA OUTLETTELEPHONE OR DATA OUTLET UNDER COUNTERTOP WHERE NO BASE CABINET EXISTS WALL CABINET WALL CABINET BASE CABINET BASE CABINET 4'-0" MIN. 2'-6" MIN. NICHE DEPTH 2' - 0" MAX. 17" - 19" CLEAR FLOOR SPACE MOUNTING HEIGHT AT OPEN DOOR CL 48" MAX.6' - 8" MAXIMUM 6" STROBE WHERE OCCURS NOTE: SWITCHES ADJACENT TO EXISTING SWITCHES ARE TO MATCH THEIR ELEVATION SWITCH(S) OR DIMMER(S) GANG UNDER ONE COMMON FACE PLATE THERMOSTAT WHERE OCCURS DOOR LEVER SCHEDULED DOOR IN OPEN POSITION NOTE:CLOSET 4'-0" WIDE AND LESS: ALL COAT STORAGE (ROD AND SHELF) TO BE MOUNTED PER ACCESSIBILITY REQUIREMENTS. CLOSET GREATER THAN 4'-0" WIDE: 2'-0" LENGTH OF COAT STORAGE (ROD AND SHELF) TO BE MOUNTED PER ACCESSIBILITY REQUIREMENTS. FIREFIGHTER'S HANDSET FIRE ALARM PULL BOX FIRE EXTINGUISHER WALL MOUNTED CABINET FIRE EXTINGUISHER WALL HUNG FIRE EXTINGUISHER IN RECESSED CABINET FIRE EXTINGUISHER AND FIRE HOSE VALVE IN RECESSED CABINET FIRE EXTINGUISHER, FIRE HOSE VALVE AND FIRE DEPARTMENT VALVE IN RECESSED CABINET FIRE DEPARTMENT VALVE IN RECESSED CABINET FH 10 1/2" 1' - 4" 4' - 11" PULL 3' - 6" MINIMUM 1' - 3" 4' - 0" MAXIMUM 4' - 0" MAXIMUM 4' - 0" MAXIMUM 3' - 6" CL CL CL 3' - 6" MIN.MIN. 6' - 8" FIRE EXTINGUISHER CABINET OUTLETS FIRE ALARM STROBE WHERE OCCURS CENTERLINE OF COLUMN WHERE OCCURS 381 15" MIN 1219 48" MAX 1219 48" MAX 508 20" MAX (a)(b) 1118 44" MAX 508-835 >20-25 MAX APPROX 12" 24". 381 15" MIN 1219 48" MAX 254 10" MAX 1219 48" MAX 254 10" MAX 864 34" MAX (a)(b) 1168 46" MAX 254-610 >10-24 MAX 864 34" MAX PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:19:38 AM 2308 MOUNTING HEIGHTS AND REACH RANGES MAY 09, 2025 PLAN CHECK SUBMITTAL 03 G0.5.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/2" = 1'-0"1TYPICAL MOUNTING HEIGHTS2 25 No.Description Date 3 PC01 CORRECTIONS 03/28/25 4 FIRE MASTER PLAN SUBMITTAL 03 01/29/25 6 PC SUBMITTAL 03 04/28/25 1/2" = 1'-0"2UNOBSTRUCTED FORWARD REACH 1/2" = 1'-0"3OBSTRUCTED HIGH REACH 1/2" = 1'-0"4SIDE REACH LIMITATIONS 1/2" = 1'-0"5UNOBSTRUCTED SIDE REACH 1/2" = 1'-0"6OBSTRUCTED HIGH SIDE REACH 6 1' - 0" EQ. EQ. EQ. TYP. 1' - 0" EQ. ATTACHMENT OF LIGHT FIXTURES AND AIR TERMINALS TO CEILING GRID (SEE NOTE NO. 23 ABOVE) 2 EACH SIDE 4 EACH SIDE #8 SELF-TAPPING SHEET METAL SCREWS 24" LONG FIXTURE OR AIR TERMINAL 48" LONG FIXTURE OR AIR TERMINAL FIXED END FREE END FR E E E N D FI X E D E N D 12 GA. HANGER WIRE 8" OR 1/4 LENGTH OF END TEE FROM WALL. SEE NOTE 3 OF THE CEILING GENERAL NOTES. CEILING GRID MEMBER ATTACHED TO TWO ADJACENT WALLS ONLY. SEE NOTE 5 OF THE CEILING GENERAL NOTES AND DETAIL 8 / A0.4.4 CEILING GRID MEMBER ATTACHED TO TWO ADJACENT WALLS ONLY. SEE NOTE 5 OF THE CEILING GENERAL NOTES AND DETAIL 8 / A0.4.4 12 GA. HANGER WIRES @48" 0.C. MAXIMUM - SEE NOTES 1, 2, & 3 OF THE CEILING GENERAL NOTES CROSS RUNNERS @ 24" O.C. MAXIMUM MAIN RUNNER @ 48" O.C. MAXIMUM LIGHT FIXTURES & HVAC GRILLES - SEE NOTE 19, 20, & 21 OF THE CEILING GENERAL NOTES. SEE NOTES 10A & 10B OF THE CEILING GENERAL NOTES DETAIL 1 / A0.4.4 AND FOR SPACING OF BRACING ASSEMBLIES SEE NOTES 10A & 10B OF THE CEILING GENERAL NOTES DETAIL 1 / A0.4.4 AND FOR SPACING OF BRACING ASSEMBLIES SEE NOTES 10A & 10B OF THE CEILING GENERAL NOTES DETAIL 1 /A0.4.4 AND FOR SPACING OF BRACING ASSEMBLIES TYP. 12 GA SPLAYED BRACING WIRES & COMPRESSION POST. SEE NOTES 9 & 10 OF THE CEILING GENERAL NOTES AND DETAIL 1 / A0.4.4 CEILING GRID MEMBERS NOT ATTACHED TO ADJACENT WALLS. SEE NOTE 7 OF THE CEILING GENERAL NOTES AND DETAIL 8 / A0.4.4 SAME CRITERIA AS NOTED ABOVE ARE APPLICABLE AT 24" X 24" GRID. 12 GA SPLAYED BRACING WIRES & COMPRESSION POST. SEE NOTES 9 & 10 OF THE CEILING GENERAL NOTES AND DETAIL 1 / A0.4.4 TYP. 12 GA. HANGER WIRE 8" OR 1/4 LENGTH OF END TEE FROM WALL. SEE NOTE 3 OF THE CEILING GENERAL NOTES. 12 GA. HANGER WIRES @48" 0.C. MAXIMUM - SEE NOTES 1, 2, & 3 OF THE CEILING GENERAL NOTES TYP. HANGER WIRE AND BRACING WIRE ATTACHMENT TO STRUCTURE. SEE NOTE 16 OF THE CEILING GENERAL NOTES SEE NOTES 10A & 10B OF THE CEILING GENERAL NOTES DETAIL 1 / A0.4.4 AND FOR SPACING OF BRACING ASSEMBLIES PLAN SECTION 1 1/2" 1/2" MIN 1 1/2" MAXIMUM LENGTH: SEE CHART 1 1/4" 1 1/4" 6" MINIMUM 6" MINIMUM 3/4" MIN. #12 X 1" SELF-TAPPING SCREWS INTO STEEL DECK, OR TWO 3/8" DIA. EXPANSION ANCHORS 2" MINIMUM EMBED INTO CONCRETE, SEE DETAILS 1/8" X 2" WIDE X 3" X 3" BENT STEEL PLATE TWO 1/4" DIA. MACHINE BOLTS WITH FLAT WASHER AT NUTS, AND TWO NUTS EACH. DO NOT CRUSH EMT. ELECTRICAL CONDUIT (EMT) COMPRESSION POST - SEE CHART BELOW FOR SIZE TWO #12 SHEET METAL SCREWS THROUGH BOTH SIDES OF SLEEVE & POST ELECTRICAL CONDUIT (EMT) SLEEVE ONE SIZE LARGE THAN COMPRESSION POST ONE 1/4" DIA. MACHINE BOLT WITH FLAT WASHER AT HEAD AND AT NUTS, AND TWO NUTS, THROUGHBOTH SIDES OF SLEEVE AND THROUGH MAIN RUNNER. DO NOT CRUSH MAIN RUNNER. MAIN RUNNER (TYP.) ELECTRICAL CONDUIT (EMT) POST METAL STUD POST MIN 1 1/4" MAXIMUM LENGTH: SEE CHART (TYP.) 6" MINIMUM 2 #10 SHEET METAL SCREWS EACH SIDE OF TRACK (TYP.) BOTTOM OF STRUCTURE 1 5/8" X 20 GAUGE METAL STUD TRACK SPANNING 2 FLUTES W/ FOUR #8 X 1/2" SELF-TAPPING SCREWS INTO STEEL DECK, OR TWO 3/8" DIA. EXPANSION ANCHORS [ICC-ER 1917], 2" MINIMUM EMBED INTO CONCRETE, SEE DETAILS 1-5/8" X 20 GAUGE METAL STUD COMPRESSION POST ATTACH STUD TO MAIN RUNNER W/ ONE 1/4" DIA. MACHINE BOLT WITH FLAT WASHER AT HEAD AND TWO NUTS, THROUGH STUD AND MAIN RUNNER. DO NOT CRUSH MAIN RUNNER. COMPRESSION POST CHART COMPRESSION POST MINIMUM CROSS SECTIONAL AREA "A" MINIMUM RADIUS OF GYRATION "R" OR "Ry" CEILING TO STRUCTURE MAXIMUM LENGTH OF COMPRESSION POST 1/2" DIA. EMT 3/4" DIA. EMT 1" DIA. EMT 1 5/8" X 20 GAUGE METAL STUD (2) 2 1/2" X 20 GAUGE METAL "T" STUDS 0.088 IN.2 0.134 IN.2 0.198 IN.2 0.155 IN.2 0.348 IN.2 0.238 IN. 0.309 IN. 0.392 IN. 0.454 IN. 0.71 IN. 3'-10" 5'-0" 6'-6" 7'-6" 15'-0" NOTE: USE EMT OR METAL STUD COMPRESSION POST WITH ACCEPTABLE CEILING TO STRUCTURE LENGTH LISTED IN CHART. OR 8" MAX (TYP) LESSER OF 1/4 LENGTH OF RUNNER, LINE OF WALL (TYP). MFR'S. APPROVED PERIMETER CLIP @ EACH RUNNER FIRST RUNNER PARALLEL TO WALL (TYP.) WALL MOLDING W/ SHEET METAL SCREW INTO EACH STL STUD OR 1/4" EXPANSION ANCHOR, 1 1/4" MINIMUM EMBED, @ 24" O.C. MAX. AT CONC.WALL (TYP.) ATTACHED TO WALL (AT TWO ADJACENT WALLS ONLY - SEE NOTE 4 OF THE CEILING GENERAL NOTES) 2" MIN. 3/4" CLR. 8" MAX (TYP) LESSER OF 1/4 LENGTH OR RUNNER, OR NOT ATTACHED TO WALL (AT OPPOSITE WALLS) HANGER WIRE - SEE NOTE 1 OF THE CEILING GENERAL NOTES (TYP.) A.) 3/4" COLD ROLLED STEEL STABILIZER CHANNEL OR B.) SLOTTED ANGLE INTERLOCKING STRUT - SEE NOTE 6 OF THE CEILING GENERAL NOTES A. B. (OMIT IF FIRST RUNNER PARALLEL TO WALL IS WITHIN 12" OF WALL) [REF. DSA IR25-2.10, FIG 2.] (TYP) 45.00° MAX (TYP) 45.00° MAX. 12 GA. VERTICAL HANGER WIRES AT 4' - 0" ON CENTER EACH WAY. SEE NOTES 1,2, & 3 OF THE CEILING GENERAL NOTES FOUR 12 GA, SPLAYED BRACING WIRES, TWO PARALLEL TO AND TWO PERPENDICULAR TO MAIN RUNNERS. (4 TURNS MIN IN 1-1/2" @ BOTH ENDS) SEE NOTES 9 & 10 OF THE CEILING GENERAL NOTES FOR ATTACHMENT TO STRUCTURE ABOVE SEE DETAILS: 7 / A0.4.4 5 / A0.4.4 6 / A0.4.4 MAIN RUNNERS CROSS RUNNERS 2" MAXIMUM FROM BRACING WIRES TO COMPRESSION STRUT (TYPICAL) (COMPRESSION POST SHALL NOT REPLACE HANGER WIRE) VERTICAL COMPRESSION POST AT EACH SET OF BRACING WIRES - SEE DETAIL 3 / A0.4.4 NOTE: WHEN MULTIPLE SADDLY TIES ARE REQ'D, THEY SHALL ALTERNATE BACK AND FORTH, SEE NOTE 7 OF THE CEILING GENERAL NOTES. TRAPEZE SADDLE TIE W/ DOUBLE LOOP SUPPORT HANGER WIRES W/ MIN. 3 TIGHT TURNS, SEE OF THE CEILING GENERAL NOTES SADDLE TIE REQ'D FOR ALL WIDTHS GREATER THAN 1/4" HANGER WIRE BRACING WIRE MAX 5/8" STRUCTURAL STEEL 12 GA. X 3/4" WIDE (MINIMUM) STEEL STRAP W/ POWDER ACTUATED FASTENER (3/4" MIN PENETRATION) HILTI X-AL-H, 0.177 , 1 1/2" MIN. EMBED [ICC ESR-1663], TYP. HANGER WIRE WITH MINIMUM 3 TIGHT TURNS IN 1 1/2" - SEE NOTES 1 & 16 OF THE CEILING GENERAL NOTES MAX 45.00° MAX 5/8" STRUCTURAL STEEL 12 GA. X 1" WIDE X 2" LONG (MINIMUM) STEEL STRAP W/ POWDER ACTUATED FASTENER (3/4" MIN PENETRATION) BRACING WIRE WITH MINIMUM 4 TIGHT TURNS IN 1 1/2" - SEE NOTES 10 & 16 OF THE CEILING GENERAL NOTES WIRE ATTACHMENT WITH EXPANSION ANCHOR 1" MIN. EQ EQ MINIMUM 20 GA. STEEL DECK (WITH CONCRETE FILL) HILTI HLC-T 1/4" X 1-3/8" EXPANSION ANCHOR WITH TIE-WIRE HEAD (OR APPROVED EQUAL) BRACING WIRE WITH MINIMUM 4 TIGHT TURNS IN 1 1/2" - SEE NOTES 10 & 16 OF THE CEILING GENERAL NOTES HANGER WIRE BRACING WIRE #3 X 12" LONG REBAR MINIMUM 20 GA. STEEL DECK (WITH NO CONCRETE FILL) HANGER WIRE TIED TO #3 REBAR WITH THREE WRAPS AROUND REBAR AND ONE WRAP AROUND WIRE -SEE NOTES 1 & 16 OF THE CEILING GENERAL NOTES. MAX 45.00° MINIMUM 20 GA. STEEL DECK ( WITH NO CONCRETE FILL) MINIMUM 12 GA. X 3" WIDE X 4" LONG STEEL STRAP W/ TWO #8 X 1/2" SELF TAPPING SCREWS BRACING WIRE WITH MINIMUM 4 TIGHT TURNS IN 1 1/2" - SEE NOTES 10 & 16 OF THE CEILING GENERAL NOTES ARMSTRONG CROSS TEE 6 1 6 1 #12 HANGER WIRE ANCHORED TO STRUCTURE ABOVE OR TO THE WALL ABOVE THE CEILING ARMSTRONG STABILIZER BAR, OR OTHER SUITABLE SYSTEM, TO KEEP PERIMETER COMPONENTS FROM SPREADING APART 3/8" 7" MAX. . IF-01. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:04:37 PM 2308 TYP CEILING DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.6 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 SUSPENDED LAY-IN PANEL ACOUSTIC CEILING GENERAL NOTES THE DESIGN AND INSTALLATION OF SUSPENDED ACOUSTIC CEILING SYSTEMS SHALL COMPLY WITH THE REQUIREMENTS CONTAINED IN TITLE 24, PART 2 - CALIFORNIA BUILDING CODE 2022 (CBC CHAP 25 AND ASTM C635 AND 636), AND WITH THE FOLLOWING ADDITIONAL REQUIREMENTS AS NOTED: 2019 CITY OF LOS ANGELES BUILDING CODE (CHAPTER 8 AND ASTM C635 AND 636) FOR SUSPENDED CEILING SYSTEMS. THE FOLLOWING REQUIREMENTS APPLY TO CEILING SYSTEMS WHOSE TOTAL WEIGHT, INCLUDING CEILING MOUNTED AIR TERMINALS, SERVICES AND LIGHT FIXTURES, DOES NOT EXCEED FOUR (4) PSF. HEAVIER SYSTEMS, AND THOSE SUPPORTING LATERAL LOADS FROM PARTITIONS, WILL REQUIRE SPECIAL DESIGN DETAILS. SEE SPECIFICATIONS SECTION 09510 FOR ADDITIONAL INFORMATION REGARDING THE SUSPENDED ACOUSTICAL CEILING SYSTEM. 1. THE CEILING GRID SYSTEM MUST BE RATED HEAVY DUTY AS DEFINED BY ASTM C635. 2. #12 GAGE WIRE SHALL BE 0.106 INCHES IN DIAMETER CONFORMING TO ASTM A641. #12 GAGE WIRE SHALL BE SOFT ANNEALED, GALVANIZED STEEL WIRE WITH A CLASS 1 COATING. 3. MAIN RUNNERS, CROSS RUNNERS, SPLICES, EXPANSION DEVICES, INTERSECTION CONNECTORS SHALL BE DESIGNED TO CARRY A MEAN ULTIMATE TEST LOAD OF NOT LESS THAN 180 LBS. IN COMPRESSION AND TENSION PER ASTM E58 - SECTION 5.1.2. 4. #12 GAGE HANGER WIRES MAY BE USED FOR UP TO AND INCLUDING 4 FT. BY. 4 FT. GRID SPACING AND SHALL BE ATTACHED TO MAIN RUNNERS. 5. PROVIDE #12 GAGE HANGER WIRES AT THE ENDS OF ALL MAIN AND CROSS RUNNERS WITHIN EIGHT (8) INCHES OF THE SUPPORT OR WITHIN ONE-FOURTH (1/4) OF THE LENGTH OF THE END TEE, WHICHEVER IS LEAST FOR THE PERIMETER OF THE CEILING AREA. THE LENGTH OF THE END TEE IS EIGHT (8) INCHES OR LESS. 6. PROVIDE TRAPEZE OR OTHER SUPPLEMENTARY SUPPORT MEMBERS AT OBSTRUCTIONS TO TYPICAL HANGER SPACING (HANGERS, STRUTS OR BRACES AS REQUIRED AT ALL CEILING BREAKS, SOFFITS, OR DISCONTINUOUS, AREAS. HANGER WIRES THAT ARE MORE THAN 1 (HORIZONTAL) IN 6 (VERTICAL) OUT OF PLUMB ARE TO HAVE COUNTER-SLOPING WIRES. PERIMETER HANGER WIRES AT MAIN RUNNERS THAT ARE POSITIVELY ATTACHED TO THE PERIMETER CLOSURE ANGLE, COUNTER-SLOPING IS OPTIONAL. NOTE: SEE ASTM C-636 FIGURE 1 FOR COUNTER-SLOPING METHODS. 7. CEILING GRID MEMBERS SHALL BE ATTACHED TO TWO (2) ADJACENT WALLS PER ASTM E580 SECTION 5.2.3 CEILING GRID MEMBERS SHALL BE AT LEAST 3/4 INCH CLEAR OF OTHER WALLS. IF WALLS RUN DIAGONALLY TO CEILING GRID SYSTEM RUNNERS, ONE END OF MAIN AND CROSS RUNNERS SHOULD BE FREE, AND A MINIMUM OF 3/4" INCH CLEAR OF WALL. 8. THE WIDTH OF THE PERIMETER SUPPORTING CLOSURE ANGLE SHALL NOT BE LESS THAN TWO (2) INCHES. 9. AT THE PERIMETER OF THE CEILING AREA WHERE MAIN OR CROSS RUNNERS ARE NOT CONNECTED TO THE ADJACENT WALL, PROVIDE INTERCONNECTION BETWEEN THE RUNNERS AND THE FREE END TO PREVENT LATERAL SPREADING. A METAL STRUT OR A #16 GAGE WIRE WITH A POSITIVE MECHANICAL CONNECTION TO THE RUNNER MAY BE USED. WHERE THE PERPENDICULAR DISTANCE FROM THE WALL TO THE FIRST PARALLEL RUNNER IS 12 INCHES OR LESS, THIS INTERLOCK IS NOT REQUIRED. 10. EXPANSION JOINTS SHALL BE PROVIDED IN THE CEILING AT INTERSECTIONS OF CORRIDORS AND AT JUNCTIONS OF CORRIDORS WITH LOBBIES OR OTHER SIMILAR AREAS. - N/A 11. PROVIDE LATERAL-FORCE BRACING ASSEMBLIES CONSISTING OF A COMPRESSION STRUT AND FOUR (4) #12 GAGE SPLAYED BRACING WIRES ORIENTED 90 DEGREES FROM EACH OTHER. -SEE DETAIL 3 / A0.4.4 EXCEPTION: LATERAL BRACING MAY BE OMITTED FOR SUSPENDED ACOUSTICAL CEILING SYSTEMS WITH A CEILING AREA OF 144 SQUARE FEET OR LESS, AND FIRE RATED SUSPENDED ACOUSTICAL CEILING SYSTEMS WITH A CEILING AREA OF 96 SQUARE FEET OR LESS, WHEN PERIMETER SUPPORT IN ACCORDANCE WITH DSA IR 25-2.10 AND ASTM E580 SECTIONS 5.2.2 AND 5.2.3 ARE PROVIDED AND PERIMETER WALLS ARE DESIGNED TO CARRY THE CEILING LATERAL FORCES. 12. THE SPACING OF THE BRACING ASSEMBLIES ARE SHOWN ON THE CONSTRUCTION DOCUMENTS. PROVIDE BRACING ASSEMBLIES AT LOCATIONS NOT MORE THAN ONE HALF (1/2) THE CALCULATED SPACING IN EACH DIRECTION FROM EACH PERIMETER WALL AND AT THE EDGES OF ANY CHANGE IN ELEVATION OF THE CEILING. SUBSTANTIATING CALCULATIONS OR TEST REPORTS FOR THE BRACING ASSEMBLIES ARE WAIVED IF THE FOLLOWING REQUIREMENTS ARE MET: A. BRACING ASSEMBLIES SPACED AT A MAXIMUM OF 12 FEET BY 12 FEET ON CENTERS FOR SCHOOL BUILDINGS AND 8 FEET BY 12 FEET ON CENTERS FOR ESSENTIAL SERVICES BUILDINGS. B. THE MAXIMUM SLENDERNESS RATIO (KL/R) OF THE COMPRESSION STRUT IS 200 OR LESS. 13. THE SLOPE OF BRACING WIRES SHALL NOT EXCEED 45 DEGREES FROM THE PLANE OF THE CEILING AND WIRES SHALL BE TAUT. SPLICES IN WIRES ARE NOT PERMITTED WITHOUT SPECIAL DSA APPROVAL. 14. COMPRESSION STRUTS SHALL NOT BE MORE THAN 1 (HORIZONTAL) IN 6 (VERTICAL) OUT OF PLUMB. 15. FOR CEILING AREAS EXCEEDING 2500 SQUARE FEET A SEISMIC SEPARATION JOINT SHALL BE PROVIDED IN ACCORDANCE WITH DETAIL TO DIVIDE THE CEILING INTO AREAS NOT EXCEEDING 2500 SQUARE FEET. ALTERNATIVELY, STRUCTURAL ANALYSIS SHALL BE PERFORMED TO DEMONSTRATE COMPLIANCE WITH ASTM E580-08 SECTION 5.2.9. 16. PENETRATIONS THROUGH THE CEILING FOR SPRINKLER HEADS AND OTHER SIMILAR DEVICES THAT ARE NOT INTEGRALLY TIED TO THE CEILING SYSTEM IN THE LATERAL DIRECTION SHALL HAVE A TWO (2) INCH OVERSIZED RING, SLEEVE OR ADAPTER THROUGH THE CEILING TILE TO ALLOW FREE MOVEMENT OF ONE (1) INCH IN ALL HORIZONTAL DIRECTIONS. ALTERNATIVELY, SWING JOINTS MAY BE PROVIDED PER ASTM E580 SECTION 5.2.8.8, A FLEXIBLE HOSE FITTING THAT CAN ACCOMMODATE 1 INCH OF CEILING MOVEMENT SHALL BE PERMITTED TO BE USED IN LIEU OF THE OVERSIZED RING, SLEEVE OR ADAPTER. 17. FASTEN #12 HANGER WIRES WITH NOT LESS THAN THREE (3) TIGHT TURNS IN 3 INCHES. HANGER WIRE LOOP SHALL BE TIGHTLY WRAPPED AND SHARPLY BENT TO PREVENT ANY VERTICAL MOVEMENT OR ROTATION OF THE MEMBER WITHIN THE LOOPS (SEE ASTM E580, SECTION 5.2.7.2). 18. FASTEN #10 GAGE OR #12 GAGE BRACING WIRES WITH FOUR (4) TIGHT TURNS. MAKE ALL TIGHT TURNS WITHIN A DISTANCE OF 1-1/2 INCHES. HANGER OR BRACING WIRE ANCHORS TO THE STRUCTURE SHOULD BE INSTALLED IN SUCH A MANNER THAT THE DIRECTION OF THE ANCHOR ALIGNS AS CLOSELY AS POSSIBLE WITH THE DIRECTION OF THE WIRE. 19. SEPARATE ALL CEILING HANGER AND BRACING WIRES AT LEAST SIX (6) INCHES FROM ALL UNBRACED DUCTS, PIPES, CONDUIT, ETC. HANGER WIRES SHALL NOT ATTACH TO OR BEND AROUND INTERFERING MATERIAL OR EQUIPMENT. 20. WHEN DRILLED-IN CONCRETE ANCHORS OR SHOT-IN ANCHORS ARE USED IN REINFORCED CONCRETE FOR HANGER WIRES, 1 OUT OF 10 WIRE/ANCHOR ASSEMBLIES MUST BE FIELD TESTED FOR 200 LBS. IN TENSION. WHEN DRILLED-IN CONCRETE ANCHORS ARE USED FOR BRACING WIRES, 1 OUT 2 WIRE/ ANCHOR ASSEMBLIES MUST BE FIELD TESTED FOR 440 LBS. IN TENSION IN THE DIRECTION OF THE WIRE. SHOT-IN ANCHORS IN CONCRETE ARE NOT PERMITTED FOR BRACING WIRES. NOTE: DRILLED-IN OR SHOT-IN ANCHORS REQUIRE SPECIAL DSA APPROVAL PRIOR TO USE IN PRESTRESSED CONCRETE. 21. ALL FIXTURES, TERMINALS, AND OTHER DEVICES SHALL BE MOUNTED IN A MANNER THAT WILL NOT COMPROMISE CEILING PERFORMANCE IN ACCORDANCE WITH SECTION 13.5.6.2.2 (5) OF ASCE 7-05 AS AMENDED BY 2010 CBC SECTION 1615A.1.16 (1615.10.13*) AND ASTM E580 SECTIONS 5.3 AND 5.4. 22. CEILING PANELS SHALL NOT SUPPORT ANY LIGHT FIXTURES, AIR TERMINALS OR DEVICES. 23. ATTACH ALL LIGHT FIXTURES AND CEILING MOUNTED AIR TERMINALS, TO THE CEILING GRID RUNNERS TO RESIST A HORIZONTAL FORCE EQUAL TO THE WEIGHT OF THE FIXTURES. SCREWS OR APPROVED FASTENERS ARE REQUIRED. MINIMUM OF TWO ATTACHMENTS ARE REQUIRED AT EACH LIGHT FIXTURE PER ASTM E580 SECTION 5.3.1. 24. RECESSED OR DROP-IN LIGHT FIXTURES, GRILLES, MECHANICAL TERMINALS, AND FLEXIBLE SPRINKLER HOSE FITTINGS OR OTHER SERVICES BE SUPPORTED DIRECTLY ON RUNNERS CLASSIFIED AS ASTM HEAVY DUTY, BUT THEY MUST ALSO HAVE A MINIMUM OF TWO (2) #12 GAGE SLACK SAFETY WIRES ATTACHED TO THE FIXTURE AT DIAGONAL CORNERS AND ANCHORED TO THE STRUCTURE ABOVE. 25. ALL FLUSH OR RECESSED LIGHT FIXTURES, MECHANICAL TERMINALS, AND FLEXIBLE SPRINKLER HOSE FITTINGS OR OTHER SERVICES WEIGHING 56 LBS OR MORE MUST BE INDEPENDENTLY SUPPORTED BY NOT LESS THAN FOUR (4) TAUT #12 GAGE WIRES ATTACHED TO THE HOUSING AND TO THE STRUCTURE ABOVE. THE FOUR (4) TAUT #12 GAGE WIRES, INCLUDING THEIR ATTACHMENT TO THE STRUCTURE ABOVE, MUST BE CAPABLE OF SUPPORTING FOUR (4) TIMES THE WEIGHT OF THE UNIT. ALL 4FT. X 4FT. LIGHT FIXTURES MUST HAVE SLACK SAFETY WIRES AT EACH CORNER. 26. SURFACE-MOUNTED FIXTURES SHALL BE ATTACHED TO THE MAIN RUNNER WITH AT LEAST TWO POSITIVE CLAMPING DEVICES MADE OF MATERIAL WITH A MINIMUM #14 GAGE. ROTATIONAL SPRING CATCHES DO NOT COMPLY. A #12 GAGE SUSPENSION WIRE SHALL BE ATTACHED TO EACH CLAMPING DEVICE TO THE STRUCTURE ABOVE. PROVIDE ADDITIONAL SUPPORTS WHEN LIGHT FIXTURES ARE 8FT. OR LONGER. MAXIMUM SPACING BETWEEN SUPPORTS SHALL NOT EXCEED 8 FEET. 27. SUPPORT PENDANT MOUNTED LIGHT FIXTURES DIRECTLY FROM THE STRUCTURE ABOVE WITH HANGER WIRES OR CABLES PASSING THROUGH EACH PENDANT HANGER AND CAPABLE OF SUPPORTING TWO (2) TIMES THE WEIGHT OF THE FIXTURE. A BRACING ASSEMBLY, PER DETAIL 16/A5-73, IS REQUIRED WHERE THE PENDANT HANGER PENETRATES THE CEILING. SPECIAL DETAILS ARE REQUIRED TO ATTACH THE PENDANT HANGER TO THE BRACING ASSEMBLY TO TRANSMIT HORIZONTAL FORCE. IF THE PENDANT MOUNTED LIGHT FIXTURE IS DIRECTLY AND INDEPENDENTLY BRACED BELOW THE CEILING, I.E. AIRCRAFT CABLES TO WALLS, THEN BRACE ASSEMBLY IS NOT REQUIRED ABOVE THE CEILING. SEE IR 16-9 FOR ADDITIONAL REQUIREMENT FOR PENDANT MOUNTED FIXTURES. 28. ALL LIGHT-WEIGHT MISCELLANEOUS DEVICES, SUCH AS STROBE LIGHTS, SPEAKERS, ETC., SHALL BE ATTACHED TO THE CEILING GRID PER SECTION 7.1 OR IR 25-2.10. IN ADDITION, DEVICES WEIGHING MORE THAN 10 LBS SHALL HAVE A #12 SLACK SAFETY WIRE ANCHORED TO THE STRUCTURE ABOVE. DEVICES WEIGHING 20 LBS OR MORE SHALL BE SUPPORTED FROM THE STRUCTURE ABOVE PER SECTION 7.3 OR IR 25-2.10. 29. FIRE RATED CEILINGS: THE COMPONENTS AND INSTALLATION SHALL CONFORM IN EVERY RESPECT WITH U.L. LISTED DETAILS. POP RIVETS, SCREWS, OR OTHER ATTACHMENTS ARE NOT ACCEPTABLE UNLESS SPECIFICALLY DETAILED AND APPROVED BY U.L. AND STATE FIRE MARSHALL RECOGNIZED LABORATORIES. 30. METAL PANELS AND PALELS WEIGHING MORE THAN 1/2 PSF, OTHER THAN MINERAL FIBER ACOUSTICAL TILE, ARE TO BE POSITIVELY ATTACHED TO THE CEILING SUSPENSION RUNNERS. 31. THE CEILING GRID SYSTEM MUST BE RATED AS HEAVY DUTY AS DEFINED BY ASTM C635. A LIST OF ACCEPTABLE GRID SYSTEMS SHOWN BELOW. THE GRID SYSTEMS SPECIFIED MUST BE ACCEPTABLE IN ACCORDANCE WITH IR A-5. THE FOLLOWING INFORMATION MUST BE INCLUDED ON THE DRAWINGS FOR EACH ACCEPTABLE GRID SYSTEM SPECIFIED: CLASSIFICATION OF CEILING GRID IS HEAVY DUTY. MANUFACTURER'S CATALOG NUMBER - MAIN RUNNER (1) (2) MANUFACTURER'S CATALOG NUMBER - CROSS RUNNER (2) MANUFACTURER'S CATALOG NUMBER OF DETAIL FOR RUNNER SPLICE (2) (1) RUNNERS MUST BE RATED AS HEAVY DUTY. (2) SHOW MANUFACTURER, DUTY CLASSIFICATION AND CATALOG NUMBERS. CLASSIFICATION OF CEILING GRID: HEAVY DUTY CEILING GRID MANUFACTURERS AND PRODUCT SYSTEMS: NOTE: SYSTEM COMPONENTS, MATERIALS, RUNNER SPLICES, AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA BUILDING CODE, THE RESPECTIVE I.C.C. EVALUATION REPORT, AND THE DSA PRODUCT APPROVAL (PA) LISTED BELOW FOR EACH MANUFACTURER AND SYSTEM. USG INTERIORS, INC. DONN DX SYSTEM (NON-RATED) DONN DXL SYSTEM (FIRE-RATED) ICC EVALUATION SERVICE REPORT NO. ER-2244 DSA PA-030 1/4" = 1'-0"3SUSPENDED CEILING SCHEMATIC PLAN1 3" = 1'-0"5COMPRESSION POST1 3" = 1'-0"9WALL/SUSPENDED CEILING INTERSECTION1 1/8" = 1'-0"2ISOMETRIC OF SUSPENDED CEILING BRACING ASSEMBLY1 3" = 1'-0"4TYP. SADDLE TIE @ TRAPEZE1 3" = 1'-0"8WIRE ATTACHMENT AT STRUCTURAL STEEL1 3" = 1'-0"7WIRE ATTACHMENT AT COMPOSITE DECK1 3" = 1'-0"6WIRE ATTACHMENT AT STEEL DECK1 3" = 1'-0"1TYP. PERIMETER CEILING TILE1 25 No.Description Date ZOO ACCESS (E) UNDERGROUND ELECTRICAL (E) UNDERGROUND TELEPHONE (E) UNDERGROUND ELECTRICAL (E) AFROCARPUS TREE (E) FICUS TREE (E) AFROCARPUS TREE (E) AFROCARPUS TREE (E) AFROCARPUS TREE (E) AFROCARPUS TREE (E) FICUS TREE (E) TREE (E) TREE (E) TREE (E) AMPHITHEATER (E) BUILDING (E) BIRDS OF PARADISE PROPOSED BUILDING B 1821 E. CHESTNUT AVE. SANTA ANA, CA, 92701 PROPOSED BUILDING A 1823 E. CHESTNUT AVE. SANTA ANA, CA, 92701 PROPOSED EDGE OF CURB (E) EDGE OF ASPHALT (E) EXHIBIT (E) EXHIBIT (E) EXHIBIT (E) PATH FUTURE ENTRY/ TICKETING (N.I.C) (E) TREE (E) TREE (E) AFROCARPUS TREE EXTENTS OF PROPOSED SPLASH PAD N.I.C (E) FICUS TREE (E) BUILDING FUTURE EXHIBIT: SPLASH PAD (NIC) (E) EDGE OF DIRT PARKING LOT I-5 HIGHWAY (E) ENTRY (E) BUILDING (E) BUILDING (E) TREE FLOOR AREA: 7,084 SF STORIES: 2 CONSTRUCTION: TYPE V-B FLOOR AREA: 3,328 SF STORIES: 1 CONSTRUCTION: TYPE V-B FUTURE PARKING LOT (NIC) PROVIDE 3" UNDERGROUND CONDUIT FROM (N) ELECTRICAL CLOSET TO EXISTING SECURITY CLOSET IN EXISTING ADMIN BUILDING SEE LANDSCAPE SHEET L5.01 FOR EXTERIOR LIGHTING SEE LANDSCAPE SHEET L5.01 FOR EXTERIOR LIGHTING PROVIDE (2) 2" UNDERGROUND CONDUIT FOR DATA FROM EXISTING ADMIN BUILDING LIMIT OF WORK AREA TRANSFORMER PER ELECTRICAL PROPOSED FIRE HYDRANT TRANSFORMER AND MECHANICAL UNIT TO BE SCREENED WITH LANDSCAPING FOLIAGE IN ACCORDANCE WITH SECTION 41-622 OF THE SAMC CONCRETE PAD FOR MECHANICAL UNIT PER LANDSCAPE 3' - 6"3' - 6" 10' - 0" FENCE GATE WITH KNOX BOX MOUNTED TO ADJACENT WALL GATE WITH KNOX BOX MOUNTED TO ADJACENT WALL PROPOSED FIRE LANE IDENTIFICATION PER FIGURE 4, OCFA GUIDE-B01 1/16" = 1'-0"1SITE PLAN PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/ 2 8 / 2 0 2 5 5 : 4 9 : 1 9 P M 2308 SITE PLAN MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A1.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date 1 DRC SUBMITTAL 02 11/21/24 NOTE: 1. THE SANTA ANA ZOO IS A REGISTERED ARBORETUM OPEN TO THE PUBLIC; THEREFORE, IT IS EXEMPT FROM MWELO REQUIREMENTS AND WATER USE CALCULATIONS. 2. FOR ALL LANDSCAPE ELEMENTS ON SITE, SEE SHEET A8.9 FOR FOOTING DETAILS ZOO ACCESS DEMO (E) PATH (E) AFROCARPUS TREE (E) FICUS TREE (E) AFROCARPUS TREE (E) AFROCARPUS TREE (E) AFROCARPUS TREE (E) AFROCARPUS TREE (E) FICUS TREE (E) TREE (E) TREE (E) TREE (E) AMPHITHEATER (E) BUILDING TO REMAIN (E) BIRDS OF PARADISE DEMO (E) PATH PORTABLE BUILDING RELOCATED BY OTHERS (E) EDGE OF ASPHALT (E) EDGE OF ASPHALT (E) EDGE OF DIRT (E) EXHIBIT (E) EXHIBIT (E) PLANTER DEMO BY OTHERS (E) PLANTER DEMO BY OTHERS (E) FICUS TREE DEMO (E) BRICK WALKWAY (E) TREE (E) TREE (E) TREE CONTAINER RELOCATED BY OTHERS TRAILER RELOCATED BY OTHERS (E) AFROCARPUS TREE (E) BUILDING TO REMAIN (E) UNDERGROUND ELECTRICAL (E) UNDERGROUND TELEPHONE (E) UNDERGROUND ELECTRICAL DEMO (E) CHAIN LINK FENCE DEMO (E) UNDERGROUND ELECTRICAL DEMO (E) UNDERGROUND TELEPHONE DEMO (E) UNDERGROUND TELEPHONE CONTAINER RELOCATED BY OTHERS (E) EXHIBIT (E) PATH (E) ENTRY (E) BUILDING (E) BUILDING (E) TREE (E) TRAILER RELOCATED BY OTHERS CONTAINERS RELOCATED BY OTHERS DEMOLISH/RELOCATE KEY EXISTING STRUCTURES BEING RELOCATED BY OTHERS TOTAL SF: 4,272 SF E MAIN ST. SOUTH ENTRANCE TO ZOO DEMO ISLAND EXISTING TO REMAIN PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 7/ 3 1 / 2 0 2 5 3 : 0 5 : 3 3 P M 2308 DEMOLITION SITE PLAN JULY 17TH, 2025 BID ADDENDUM 01 A1.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB JULY 17TH, 2025 1/16" = 1'-0"1DEMOLITION SITE PLAN 25 1" = 30'-0"2DEMO AT SITE ENTRANCE No.Description Date 9 PC SUBMITTAL 06 07/31/25 9 (E) AMPHITHEATER PROPOSED BUILDING B PHASE 2 PROPOSED BUILDING A PHASE 1 FUTURE ENTRY/ TICKETING (N.I.C) (E) TREE (E) BUILDING I-5 HIGHWAY FUTURE EXHIBIT: SPLASH PAD (N.I.C) PHASE 2 PHASE 1 TERMINATE ALL UTILITY LINES AT PHASE 1 BOUNDARY TERMINATE ALL UTILITY LINES AT PHASE 1 BOUNDARY EXISTING WATER LINE TO REMAIN FOR PHASE 1 ENTIRE FIRE LANE IDENTIFICATION RED CURB TO BE PAINTED IN PHASE 1 TRANSFORMER, MECHANICAL UNIT FOR BUILDING A, AND CONCRETE PAD TO BE INSTALLED DURING PHASE 1 WOODEN BENCH TO BE INSTALLED DURING PHASE 2 FIRE HYDRANT TO BE INSTALLED DURING PHASE 1 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/ 2 8 / 2 0 2 5 5 : 4 9 : 3 0 P M 2308 PHASING PLAN MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A1.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1/16" = 1'-0"1PHASE 1 SITE PLAN No.Description Date 1 DRC SUBMITTAL 02 11/21/24 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/ 2 8 / 2 0 2 5 5 : 4 9 : 3 4 P M 2308 ZOO MASTER ADDRESSING PLAN MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A1.4 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date 1 DRC SUBMITTAL 02 11/21/24 R 20' - 0" 92 ' - 0 " 20 ' - 0 " PROPOSED FIRE LANE R 40' - 0" R 40' - 0" R 20' - 0" R 40 ' - 0" R 20' - 0" R 40' - 0" R 20' - 0" R 40' - 0" R 20' - 0" E MAIN ST. I-5 SANTA ANA FREEWAY 20' - 0" 20' - 0" 20' - 0" 20 ' - 0 " (E) OPEN AIR AMPHITHEATRE PROPOSED BUILDING B PROPOSED FIRE HYDRANT PAINT RED (E) FIRE HYDRANT DISABLED ACCESS ROUTE OF TRAVEL SLOPE LESS THAN 1:20 (E) CHAINLINK FENCE, 8'-0" HEIGHT PROPOSED WELDED WIRE FENCE, 6'-0" HEIGHT EXISTING 3" WATER METER FUTURE BUS DROP OFF LOCATION FOR STUDENTS PROPOSED TRANSFORMER (E) UNDERGROUND ELECTRICAL (E) UNDERGROUND TELEPHONE (E) UNDERGROUND ELECTRICAL (E) AFROCARPUS TREE, TYP. (E) TREE (E) TREE(E) TREE (E) BUILDING (E) BIRDS OF PARADISE, TYP. (E) TREE (E) TREE (E) FICUS TREE (E) ADMIN BUILDING FUTURE EXHIBIT: SPLASH PAD (NIC) (E) TREE BUILDING OVERHANG BUILDING OVERHANG (E) LIGHT POLE WITH DOUBLE ARM, TYP. (E) POLE (E) BLOCK UTILITY BUILDING (E) POWER POLE, TYP. (E) CHAINLINK FENCE, 8'-0" HEIGHT (E) FIRE HYDRANT (E) STANDPIPE, TYP. PROPOSED BUILDING A (E) TRASH/RECYCLING (E) RETAINING WALL (E) CHAINLINK FENCE, 6'-0" HEIGHT 26' - 7 7/8" STREET CENTERLINE PROPERTY LINE (E) STREET TREES (E) WIRE MESH BUILDING (E) FIRE HYDRANT (E) LOADING ZONE 10' - 0 " 35' - 0" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 171 172 173 174 1A 2A 3A 4A 5A 6A 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 (E) ZOO ENTRANCE DISABLED ACCESS ROUTE OF TRAVEL SLOPE LESS THAN 1:20 PROPOSED MECHANICAL UNITS CBC 206.2.1 EXCEPTION 2 AN ACCESSIBLE ROUTE SHALL NOT BE REQUIRED BETWEEN SITE ARRIVAL POINTS AND THE BUILDING OR FACILITY ENTRANCE IF THE ONY MEANS OF ACCESS BETWEEN THEM IS A VEHICULAR WAY NOT PROVIDING PEDESTRIAN ACCESS. VAN ACCESSIBLE SPACE SEE 1/G0.5.1 ACCESS TO PROJECT ACCESSIBLE PARKING SPACES SERVING ZOO ENTRANCE DIASBLED ACCESS ROUTE OF TRAVEL SLOPE LESS THAN 1:20 LEGEND 20' WIDE MINIMUM FIRE ACCESS ROADWAY FIRE HYDRANT LANDSCAPED AREAS TOTAL PROPOSED LANDSCAPE AREA: 11,118 SF DISABLED ACCESS ROUTE OF TRAVEL LIGHT POLE WITH DOUBLE ARM LIGHT POLE WITH SINGLE ARM MANHOLE COVER PROPERTY LINE EXISTING FENCE PROPOSED FENCE LOADING ZONE TRASH ENCLOSURE PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:05:49 AM 2308 SITE PLAN WITH PARKING MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A1.5 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 25 1" = 30'-0"1SITE PLAN WITH PARKING No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 NOTE 1. PER CBC SECTION 11B-208.2, FOR A TOTAL NUMBER OF PARKING SPACES BETWEEN 151 TO 200 (189 PARKING SPACES PROVIDED), THERE SHALL BE A MINIMUM OF 6 ACCESSIBLE PARKING SPACES. THE ZOO HAS 6 ACCESSIBLE PARKING SPACES INCLUDING 1 VAN ACCESSIBLE SPACE. 6 R2 S1 S3 S4 74' - 8 1/2" U6 U1 V1 V2 V4 V5 Y1 X1 Y2 MULTIPURPOSE ROOM 101 R1 FURNITURE STORAGE 103 BREAK ROOM 102 WORKSHOP 107 MATERIAL STORAGE 108 ELECTRICAL ROOM 109 CUSTODIAN CLOSET 110 ELEVATOR 111 LUNCH STORAGE 113 37' - 3 1/4" S2 X2 X3 U5 U4 U3 21' - 3" 9' - 10" 46' - 10" 21' - 3" 9' - 11 3/4" 25' - 1 1/2" 39' - 7 1/4" MACHINE ROOM 112 ADA FAMILY RESTROOM 104 RESTROOM 114 TICKET BOOTH 105 LOWER HUB 106 OVERHANG ABOVE BUILDING B PHASE 2 BUILDING A PHASE 1 1 A5.0.1 2 A5.0.1 1 A4.0.2 77' - 11" U2 A6.14 4 A6.14 1 V3 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 1 A4.0.1 2 A4.0.2 2 A4.0.1 X4 BUILDING A: 129.09 FF SEE C1.40 FOR MORE DETAIL. BUILDING B: 129.21 FF SEE C1.40 FOR MORE DETAIL. AREA DRAIN, SEE CIVIL, TYP. LANDSCAPE LIGHTING, SEE LANDSCAPE, TYP. TRANSFORMER PER ELECTRICAL HVAC UNITS PER MECHANICAL FDC CONNECTION STORAGE 115 FIRE SPRINKLER RISER OVERHANG ABOVE FDC CONNECTION FIRE SPRINKLER RISER SWITCHGEAR PER ELECTRICAL PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:49:45 PM 2308 KEY PLANS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.0.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 3/16" = 1'-0"1KEY PLAN LEVEL 1 25 No.Description Date R2 S1 S3 S4 U6 U1 V1 V2 V4 V5 Y1 X1 Y2 R1 37' - 3 1/4" SHARED OFFICE 218 LARGE OFFICE 203 MEETING ROOM 207 IT ROOM 206 LARGE OFFICE 208 MEDIUM OFFICE 209 SMALL OFFICE 210 SMALL OFFICE 213 STORAGE 216STAFF RESTROOM 217 MEDIUM OFFICE 214 74' - 8 1/2" 35' - 1 1/4" 39' - 7 1/4" S2 X2 X3 U5 U4 U3 81' - 2 1/2" 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 25' - 9 7/8" 43' - 10 3/4" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" SMALL OFFICE 212SMALL OFFICE 211 MEDIUM OFFICE 202 CLOSET 219 CLOSET 204 CLOSET 205 BREAK ROOM 215 UPPER HUB 201 1 A5.0.1 2 A5.0.1 1 A4.0.2 U2 V3 21' - 3" 21' - 3" 9' - 10" 46' - 10" 77' - 11" 1 A4.0.1 2 A4.0.2 X4 BUILDING A PHASE 1 BUILDING B PHASE 2 2 A4.0.1 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:49:50 PM 2308 KEY PLANS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.0.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 3/16" = 1'-0"1KEY PLAN LEVEL 2 25 No.Description Date R2 S1 S3 S4 U6 U1 V1 V2 V4 V5 Y1 X1 Y2 R1 S2 X2 X3 U5 U4 U3 BUILDING B PHASE 2 1 A5.0.1 2 A5.0.1 1 A4.0.2 U2 V3 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 21' - 3" 9' - 10" 46' - 10" 77' - 11" 21' - 3" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 37' - 3 1/4" 9' - 11 3/4" 25' - 1 1/2" 39' - 7 1/4" 74' - 8 1/2" 1 A4.0.1 2 A4.0.2 X4 1 ZA.6.2 BUILDING A PHASE 1 2 A4.0.1 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:49:54 PM 2308 KEY PLANS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.0.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 3/16" = 1'-0"1ROOF KEY PLAN 25 No.Description Date R2 S1 S3 S4 1 A5.1.0 3 A5.1.0 R1 S2 2 A4.1.0 74' - 8 1/2" FURNITURE STORAGE 103 BREAK ROOM 102 37' - 3 1/4" 9' - 11 3/4" 25' - 1 1/2" 39' - 7 1/4" 4 A5.1.0 103A 102A 102B 101O A6.1 2 3 1 4 A6.2 1 A6.2 3 101A 4 A4.1.0 3 A4.1.0 101C 101D 101E 101F 101G 101H 101I 101K 101L 101M 101N 101J 9' - 7 7/8" 2 A5.1.0 2A 2A 3B(1) 3B(1) 3B(1) 2A 3A(1) 3A(1) 3A(1) 3A(1) 4A(1) 4A(1) 4E(1) 3A(1) 4F(1) MI.10 101B MI.07 MI.08 MI.07 MI.10 MI.10 101P S1011 S1012 45' - 6 1/8" 18' - 2" 11' - 0 3/8" 3' - 4 1/4" 18' - 2 1/2" 15' - 8 5/8" 7' - 9 1/4" 17' - 9 1/2" 14' - 1 1/4" 17' - 9 1/4" 17' - 3 1/4" 15' - 5 5/8" 21' - 9 5/8" MI.08 PROVIDE SOLID BLOCKING ON EACH END OF OPERABLE PARTITION PROVIDE SOLID BLOCKING ON EACH END OF OPERABLE PARTITION 1 A4.1.0 FDC SWITCHGEAR PER ELECTRICAL FIRE SPRINKLER RISER 4' - 11 7/8" MULTIPURPOSE ROOM 101 R2 S1 S3 S4 1 A5.1.0 3 A5.1.0 R1 S2 2 A4.1.0 4 A5.1.0 4 A4.1.0 3 A4.1.0 74' - 8 1/2" 37' - 3 1/4" 9' - 7 7/8" 2 A5.1.0 RF-01 SOLAR ZONE: 659.6 SF SOLAR ZONE: 543.7 SF 301A 25' - 3 1/2" 9' - 11 1/4" 10' - 0" 21' - 6" 5' - 8 1/8" 26' - 1" 25' - 3 1/2" 9' - 11 1/4" MI.12 6' - 0" MI.12 MI.12 MI.12 MI.12 MI.12 1 A4.1.0 5' - 6" 5' - 0" 6' - 0" 5' - 0" WALL TYPE KEY EXTERIOR CONCRETE WALL, SEE 1/A8.11A(2) EXTERIOR CONCRETE WALL, SEE 2/A8.11B(2) EXTERIOR WOOD SIDING WALL, SEE 3/A8.12A 1 HOUR FIRE RATED EXTERIOR WOOD SIDING WALL W PLWYOOD, SEE 4/A8.12B(1) 1 HOUR FIRE RATED EXTERIOR TILE WALL TCNA W244E, SEE 5/A8.13A(1) 1 HOUR FIRE RATED EXTERIOR TILE WALL TCNA W244E, SEE 6/A8.13B(1) EXTERIOR TILE WALL TCNA W244E, SEE 7/A8.13C 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 8/A8.14A(1) INTERIOR FURRED PARTITION, SEE 9/A8.14B INTERIOR FURRED PARTITION, SEE 10/A8.14C INTERIOR FURRED PARTITION, SEE 11/A8.14D 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 12/A8.14E(1) 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 13/A8.14F(1) INTERIOR TILE PARTITION TCNA W244, SEE 14/A8.15A INTERIOR TILE PARTITION TCNA W244, SEE 15/A8.15B 1 HOUR FIRE RATED INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 16/A8.16A(1) INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 17/A8.16B INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 18/A8.16C INTERIOR PARTITION WITH FIRE RATED PLYWOOD, SEE 19/A8.16D 1 HOUR FIRE RATED INTERIOR PARTITION WITH PLYWOOD, SEE 20/A8.17A(1) INTERIOR PARTITION WITH PLYWOOD, SEE 21/A8.17B INTERIOR PARTITION WITH PLYWOOD, SEE 26/A8.17G INTERIOR PARTITION WITH PLYWOOD, SEE 27/A8.17H INTERIOR GLASS PARTITION, SEE 27/A8.18 INTERIOR PARTITION W PLYWOOD, SEE 28/A8.17I 1 HOUR FIRE RATED INTERIOR PARTITION WITH PLYWOOD, SEE 29/A8.17J(1) INTERIOR PARTITION WITH PLYWOOD, SEE 23/A8.17D INTERIOR PARTITION WITH PLYWOOD, SEE 24/A8.17E INTERIOR PARTITION WITH PLYWOOD, SEE 25/A8.17F INTERIOR PARTITION WITH PLYWOOD, SEE 22/A8.17C PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:06:05 AM 2308 FLOOR PLANS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A3.1.1A SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/4" = 1'-0"1BUILDING A LEVEL 1 FLOOR PLAN - PHASE 1 1/4" = 1'-0"2BUILDING A ROOF PLAN - PHASE 1 25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA SOLAR ZONE: TOTAL ROOF AREA BUILDING A: 3,494 SF TOTAL ROOF AREA BUILDING B: 3,314 SF TOTAL ROOF AREA FOR BUILDING A+B: 6,808 SF TOTAL SOLAR ZONE PROVIDED: 1,203 SF (15% OF THE TOTAL ROOF AREA) FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 NOTES 1. PROVIDE 8 PORTABLE ASSISTED LISTENING DEVICES PER 11B-219, ASSISTIVE LISTENING SYSTEMS. 180 SEATS X 4%=7.2 6 U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 WORKSHOP 107 MATERIAL STORAGE 108 ELECTRICAL ROOM 109 CUSTODIAN CLOSET 110 ELEVATOR 111 LUNCH STORAGE 113 21' - 3"9' - 10"46' - 10" ADA FAMILY RESTROOM 104 MACHINE ROOM 112 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 A6.3 4 A6.4 3 A6.5 6 A6.6 3 A6.7 3 106A 107A 1051 108A 112A 106B 113A TICKET BOOTH 105 RESTROOM 114 114A 114B 114C 114D 114F 108B LOWER HUB 106 A6.16 1 4 A4.2.1 3 A4.2.1 7 A4.2.1 6 A4.2.1 5 A4.2.1 107B U2 104A 2 A5.1.3 1 A5.1.4 1A ( 2 ) 1A(2) 1A ( 2 ) 1A(2) 1A(2) 2A 2A 2A 1A(2) 1B ( 2 ) 1A ( 2 ) 1B ( 2 ) 1A ( 2 ) 1A ( 2 ) 1A(2)1A(2) 4A ( 1 ) 1A(2) 2A 4D 4A(1) 4A(1) 4B 4A ( 1 ) 4A ( 1 ) 4A ( 1 ) 4A ( 1 ) 5A5A5A5A 7D 5A 4E(1) 4E(1) 4A(1) 2A 5B 1A(2) 1A ( 2 ) 5B 4A ( 1 ) 8 8 1A(2) 109A 115B 115A V3 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 107C 2B(1) 4A ( 1 ) 4A(1) 4A ( 1 ) MI.10 2A MI.08 2 A4.2.1 77' - 11" 1 A4.2.1 X42 A4.2.0 A6.15.3 2 4E(1) 2B(1) ST A I R 0 2 A 3 A5.1.2 108C 4E(1) 4A ( 1 ) 10' - 0 3/4" 110A S1071 S1061 5A 15' - 0 3/4"6' - 6 1/4" 9' - 10" 6' - 10 1/2" 11' - 10" 6' - 9 1/2"16' - 4"5' - 0" 42' - 3 1/2" 11' - 1 3/8" 20' - 11" 10' - 1 1/2" 21' - 3" HVAC UNITS PER MECHANICAL, TYP. 9' - 9 1/2" 8' - 6 5/8" 5' - 7 1/2" 8' - 0" 2' - 4 1/2" 9' - 6 5/8" 13' - 3 3/8" MI.07 MI.07 TB.02 4A(1) 1A ( 2 ) 4D 4' - 0" 2' - 6" 2' - 6" MI.16 MI.16 STORAGE 115 FIRE DEPARTMENT CONNECTION 4A(1) A6.15.1 5 STAIR 01A A8.7 9 29' - 0 3/8" WALL TYPE 4B ABOVE WALL TYPE 4B ABOVE WALL TYPE 4B ABOVE WALL TYPE 4A BELOW 4E(1)WALL TYPE 7H ABOVE FIRE SPRINKLER RISER OVERHANG ABOVE OVERHANG ABOVE WATER HEATER PER PLUMBING 7 G0.5.1 6 5A 4A ( 1 ) 114E WALL TYPE KEY EXTERIOR CONCRETE WALL, SEE 1/A8.11A(2) EXTERIOR CONCRETE WALL, SEE 2/A8.11B(2) EXTERIOR WOOD SIDING WALL, SEE 3/A8.12A 1 HOUR FIRE RATED EXTERIOR WOOD SIDING WALL W PLWYOOD, SEE 4/A8.12B(1) 1 HOUR FIRE RATED EXTERIOR TILE WALL TCNA W244E, SEE 5/A8.13A(1) 1 HOUR FIRE RATED EXTERIOR TILE WALL TCNA W244E, SEE 6/A8.13B(1) EXTERIOR TILE WALL TCNA W244E, SEE 7/A8.13C 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 8/A8.14A(1) INTERIOR FURRED PARTITION, SEE 9/A8.14B INTERIOR FURRED PARTITION, SEE 10/A8.14C INTERIOR FURRED PARTITION, SEE 11/A8.14D 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 12/A8.14E(1) 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 13/A8.14F(1) INTERIOR TILE PARTITION TCNA W244, SEE 14/A8.15A INTERIOR TILE PARTITION TCNA W244, SEE 15/A8.15B 1 HOUR FIRE RATED INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 16/A8.16A(1) INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 17/A8.16B INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 18/A8.16C INTERIOR PARTITION WITH FIRE RATED PLYWOOD, SEE 19/A8.16D 1 HOUR FIRE RATED INTERIOR PARTITION WITH PLYWOOD, SEE 20/A8.17A(1) INTERIOR PARTITION WITH PLYWOOD, SEE 21/A8.17B INTERIOR PARTITION WITH PLYWOOD, SEE 26/A8.17G INTERIOR PARTITION WITH PLYWOOD, SEE 27/A8.17H INTERIOR GLASS PARTITION, SEE 27/A8.18 INTERIOR PARTITION W PLYWOOD, SEE 28/A8.17I 1 HOUR FIRE RATED INTERIOR PARTITION WITH PLYWOOD, SEE 29/A8.17J(1) INTERIOR PARTITION WITH PLYWOOD, SEE 23/A8.17D INTERIOR PARTITION WITH PLYWOOD, SEE 24/A8.17E INTERIOR PARTITION WITH PLYWOOD, SEE 25/A8.17F INTERIOR PARTITION WITH PLYWOOD, SEE 22/A8.17C PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:06:14 AM 2308 FLOOR PLANS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A3.1.1B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/4" = 1'-0"1BUILDING B LEVEL 1 FLOOR PLAN - PHASE 2 25 No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 SHARED OFFICE 218 LARGE OFFICE 203 MEETING ROOM 207 IT ROOM 206 LARGE OFFICE 208 MEDIUM OFFICE 209 SMALL OFFICE 210 SMALL OFFICE 213 STORAGE 216 MEDIUM OFFICE 214 81' - 2 1/2" 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 43' - 10 3/4" SMALL OFFICE 212 SMALL OFFICE 211 MEDIUM OFFICE 202 CLOSET 204 CLOSET 205 CLOSET 219 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 A6.8 1 A6.9 11 A6.10 2 A6.12 2 A6.13.1 1 A6.9 9 206A 203A 204A 208A 205A 209A 210A 211A 212A 213A 214A 217A 216A 218A 219A 2034 2081 2143 2151 UPPER HUB 201 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 2184 BREAK ROOM 215 A6.15.1 1 A6.16 2 215A DK-01 TERRACE U2 A6.10 7 A6.15.3 2 2 A5.1.3 1 A5.1.4 6B 2A 2A 3A(1) 3A(1) 4A(1) 6B 4E(1) 4E(1) 4E(1) 4E(1) 6B 6D 7F 7A(1) 6C 6C 6C 6A(1) 6B 4E(1) 4E(1) 4B 4A(1) 6C 7J(1) 7J(1) 6B 6B 6B 6B 7B 7B 6B 1A ( 2 ) 1A(2) 7B 4E(1)4E(1) 8 7E 7A(1) 7I STAFF RESTROOM 217 5A V3 21' - 3"9' - 10"46' - 10" 2A 2A 2A MI.10 21' - 3" 2 A4.2.1 3C 77' - 11" A6.10 2 A6.10 2 A6.10 2 A6.9 11 A6.8 1 A6.9 11 207A X42 A4.2.0 MI.10 OPP. OPP. A6.11 1 2B(1) 2B(1) 2012 ST A I R 0 2 B ST A I R 0 2 A 3 A5.1.2 6B STAIR 01A STAIR 01B 4C 4B 7A(1) MI.11 4E(1) S2091 S2101 S2111 S2121 S2131 S2141 S2181 S2031 S2081 S2072 2032 2023 2022 2021 2011 2186 2185 2182 2181 2142 2141 21312121 21122111 2101 20922091 2084 2082 12' - 11 1/4" 13' - 4 7/8" 10' - 6" 10' - 6" 10' - 5 3/4" 10' - 6 3/8" 13' - 11 5/8" 18' - 11 7/8" 7' - 0 3/4" 18' - 7 7/8" 12' - 11 1/4" 13' - 4 7/8" 23' - 5 7/8" 7' - 6 3/4" 3' - 11" 21' - 0 1/8" 11' - 0 3/4" 23' - 0 3/4" 10' - 11 3/8" S2071 S2073 S2021 7G 7H 5 A8.7 AREA DRAINS AT TERRACE; SEE 10/A8.7 202A 2031 AREA DRAINS AT TERRACE; SEE 10/A8.7 OPP. OPP. 8 8 6D WALL TYPE 7C ABOVE WALL TYPE 7C ABOVE WALL TYPE 7C ABOVE WALL TYPE 7C ABOVE 6 WALL TYPE KEY EXTERIOR CONCRETE WALL, SEE 1/A8.11A(2) EXTERIOR CONCRETE WALL, SEE 2/A8.11B(2) EXTERIOR WOOD SIDING WALL, SEE 3/A8.12A 1 HOUR FIRE RATED EXTERIOR WOOD SIDING WALL W PLWYOOD, SEE 4/A8.12B(1) 1 HOUR FIRE RATED EXTERIOR TILE WALL TCNA W244E, SEE 5/A8.13A(1) 1 HOUR FIRE RATED EXTERIOR TILE WALL TCNA W244E, SEE 6/A8.13B(1) EXTERIOR TILE WALL TCNA W244E, SEE 7/A8.13C 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 8/A8.14A(1) INTERIOR FURRED PARTITION, SEE 9/A8.14B INTERIOR FURRED PARTITION, SEE 10/A8.14C INTERIOR FURRED PARTITION, SEE 11/A8.14D 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 12/A8.14E(1) 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 13/A8.14F(1) INTERIOR TILE PARTITION TCNA W244, SEE 14/A8.15A INTERIOR TILE PARTITION TCNA W244, SEE 15/A8.15B 1 HOUR FIRE RATED INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 16/A8.16A(1) INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 17/A8.16B INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 18/A8.16C INTERIOR PARTITION WITH FIRE RATED PLYWOOD, SEE 19/A8.16D 1 HOUR FIRE RATED INTERIOR PARTITION WITH PLYWOOD, SEE 20/A8.17A(1) INTERIOR PARTITION WITH PLYWOOD, SEE 21/A8.17B INTERIOR PARTITION WITH PLYWOOD, SEE 26/A8.17G INTERIOR PARTITION WITH PLYWOOD, SEE 27/A8.17H INTERIOR GLASS PARTITION, SEE 27/A8.18 INTERIOR PARTITION W PLYWOOD, SEE 28/A8.17I 1 HOUR FIRE RATED INTERIOR PARTITION WITH PLYWOOD, SEE 29/A8.17J(1) INTERIOR PARTITION WITH PLYWOOD, SEE 23/A8.17D INTERIOR PARTITION WITH PLYWOOD, SEE 24/A8.17E INTERIOR PARTITION WITH PLYWOOD, SEE 25/A8.17F INTERIOR PARTITION WITH PLYWOOD, SEE 22/A8.17C PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:06:24 AM 2308 FLOOR PLANS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A3.1.2B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/4" = 1'-0"1BUILDING B LEVEL 2 FLOOR PLAN - PHASE 2 25 No.Description Date 6 PC SUBMITTAL 03 04/28/25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 U2 2 A5.1.3 1 A5.1.4 RF-01 V3 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 21' - 3"9' - 10"46' - 10" 77' - 11" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 21' - 3" 2 A4.2.1 X42 A4.2.0 3001 3 A5.1.2 MI.12 10' - 0" 10' - 0" MI.12 10' - 0" MI.12 MI.12 10' - 0" RF-01 301B HVAC UNIT PER MECHANICAL WALL TYPE KEY EXTERIOR CONCRETE WALL, SEE 1/A8.11A(2) EXTERIOR CONCRETE WALL, SEE 2/A8.11B(2) EXTERIOR WOOD SIDING WALL, SEE 3/A8.12A 1 HOUR FIRE RATED EXTERIOR WOOD SIDING WALL W PLWYOOD, SEE 4/A8.12B(1) 1 HOUR FIRE RATED EXTERIOR TILE WALL TCNA W244E, SEE 5/A8.13A(1) 1 HOUR FIRE RATED EXTERIOR TILE WALL TCNA W244E, SEE 6/A8.13B(1) EXTERIOR TILE WALL TCNA W244E, SEE 7/A8.13C 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 8/A8.14A(1) INTERIOR FURRED PARTITION, SEE 9/A8.14B INTERIOR FURRED PARTITION, SEE 10/A8.14C INTERIOR FURRED PARTITION, SEE 11/A8.14D 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 12/A8.14E(1) 1 HOUR FIRE RATED INTERIOR PARTITION, SEE 13/A8.14F(1) INTERIOR TILE PARTITION TCNA W244, SEE 14/A8.15A INTERIOR TILE PARTITION TCNA W244, SEE 15/A8.15B 1 HOUR FIRE RATED INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 16/A8.16A(1) INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 17/A8.16B INTERIOR PARTITION WITH RESILIENT CHANNEL, SEE 18/A8.16C INTERIOR PARTITION WITH FIRE RATED PLYWOOD, SEE 19/A8.16D 1 HOUR FIRE RATED INTERIOR PARTITION WITH PLYWOOD, SEE 20/A8.17A(1) INTERIOR PARTITION WITH PLYWOOD, SEE 21/A8.17B INTERIOR PARTITION WITH PLYWOOD, SEE 26/A8.17G INTERIOR PARTITION WITH PLYWOOD, SEE 27/A8.17H INTERIOR GLASS PARTITION, SEE 27/A8.18 INTERIOR PARTITION W PLYWOOD, SEE 28/A8.17I 1 HOUR FIRE RATED INTERIOR PARTITION WITH PLYWOOD, SEE 29/A8.17J(1) INTERIOR PARTITION WITH PLYWOOD, SEE 23/A8.17D INTERIOR PARTITION WITH PLYWOOD, SEE 24/A8.17E INTERIOR PARTITION WITH PLYWOOD, SEE 25/A8.17F INTERIOR PARTITION WITH PLYWOOD, SEE 22/A8.17C PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:06:33 AM 2308 FLOOR PLANS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A3.1.3B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/4" = 1'-0"1BUILDING B ROOF PLAN - PHASE 2 25 No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING A A A WAP WAP R2 S1 S3 S4 1 A5.1.0 3 A5.1.0 R1 S2 1 A4.1.0 2 A4.1.0 MULTIPURPOSE ROOM 101 BREAK ROOM 102 FURNITURE STORAGE 103 9' - 0" 37' - 3 1/4" 74' - 8 1/2" 9' - 11 3/4" 25' - 1 1/2" 39' - 7 1/4" 4 A5.1.0 U-EMU U-EM U U U-EM U-EM U U-EM U U-EM U U-EM U U-EM U IF-01 A6.2 4 A6.2 2 4 A4.1.0 3 A4.1.0 TI-01 C C C C C C C C C K3 K3 S.01 S.01 S.01 C C MI.05 MI.05 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.09 MI.09 2 A5.1.0 12' - 0" H H H PT-01 FC-01 TYP. BETWEEN FRAMING AND BEAMS GLB-01 TYP. PER STRUCTURAL PT-01 HH MI.01 MI.01 MI.01 MI.01 K3 K3 EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ CEILING MOUNTED ELECTRICAL INFRASTRUCTURE SHALL BE INSTALLED TIGHT TO CEILING AND EXPOSED STRUCTURAL FRAMING, TYP. CEILING MOUNTED ELECTRICAL INFRASTRUCTURE SHALL BE INSTALLED TIGHT TO CEILING AND EXPOSED STRUCTURAL FRAMING, TYP. N N N N MI.01 MI.01 MI.01 MI.01 MI.01 35' - 8" A6.0.2 1 A6.0.1 1 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:50:47 PM 2308 REFLECTED CEILING PLANS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.2.1A SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1BUILDING A LEVEL 1 REFLECTED CEILING PLAN - PHASE 1 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT NOTE: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING WAP WAP AA U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 ELECTRICAL ROOM 109 CUSTODIAN CLOSET 110 MACHINE ROOM 112 ELEVATOR 111 LUNCH STORAGE 113 ADA FAMILY RESTROOM 104 8' - 6" 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 A6.3 11 A6.4 6 A6.5 7 A6.6 6 A6.7 6 A-EM A-EM A A-EM A-EM A-EM AAA A A A A B B B B B B B C C C CC C C C C C C C C C C C C 21' - 3" 9' - 10" 46' - 10" C C C C C C C C T LOWER HUB 106 WORKSHOP 107 MATERIAL STORAGE 108 RESTROOM 114 9' - 0" A-EM 4 A4.2.1 3 A4.2.1 7 A4.2.1 6 A4.2.1 5 A4.2.1 TI-01 OVERHANG ABOVE F F F FFF H-EM H U2 S.01 S.01 S.01 S.01 S.01 S.01 S.01 A A A A A S A A MI.04 3' - 0" EQ EQ H MI.04 EQ EQ 5' - 2 3/4" MI.04 EQ EQ 4' - 0 1/8"MI.04 MI.05 MI.06 2 A5.1.3 1 A5.1.4 TI-01 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" V3 2 A4.2.1 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 77' - 11" 21' - 3" 43' - 10 3/4" 1 A4.2.1 X42 A4.2.0 K3 H H HH PT-01 PT-01 PT-01 PT-01 PT-01 PT-01 PT-01 PT-01 3 A5.1.2 1051 107B V V V V V V V V K4 A-EM 3' - 0" 8' - 0" 8' - 0" 3' - 0" 8' - 0" 8' - 0" 8' - 0" 12' - 6" C 3' - 0" 3' - 1" 2' - 11" 3' - 0" 3' - 0" 3' - 0" 4' - 9" 9' - 8" 3' - 0" NN N 10' - 1" 10' - 1" 108B 3' - 8" 8' - 0" 8' - 0" 2' - 2" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:51:00 PM 2308 REFLECTED CEILING PLANS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.2.1B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1BUILDING B LEVEL 1 REFLECTED CEILING PLAN - PHASE 2 25 NOTE: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING WAP WAP WAP U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 MEDIUM OFFICE 202 LARGE OFFICE 203 IT ROOM 206 LARGE OFFICE 208 MEDIUM OFFICE 209 SMALL OFFICE 210 SMALL OFFICE 211 SMALL OFFICE 212 SMALL OFFICE 213 MEDIUM OFFICE 214 STAFF RESTROOM 217 SHARED OFFICE 218 MEETING ROOM 207 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 8' - 0" 9' - 0" CLOSET 205CLOSET 204 CLOSET 219 UPPER HUB 201 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 A6.8 2 A6.9 12 A6.10 1 A6.12 1 A6.13.1 2 A6.9 10 A A A A A A A A A A-EM A A-EM A A A A 8' - 6" K K K P P P R 8' - 0" 11' - 0" A BREAK ROOM 215 D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D-EM D D-EM D D-EM D-EM D D-EM D K K K K K K K K K K K K K K K K K STORAGE 216 U2 S.01 S.01 S.01 Q Q K4 K4 K4 K4 K4 K4 MI.01 MI.01 MI.01 MI.01 MI.01 MI.01 MI.01 A6.10 8 MI.05 MI.05 MI.05 MI.05 MI.05 MI.05 MI.05 MI.05 MI.05 MI.05 MI.05 A-EM A-EM MW-01H-EM 2 A5.1.3 1 A5.1.4 A V3 H H D-EM D 2 A4.2.1 21' - 3" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 21' - 3" 9' - 10" 46' - 10" 77' - 11" 9' - 0" 8' - 6" A6.10 1 A6.10 1 A6.10 1 A6.9 12 A6.8 2 A6.9 12 X42 A4.2.0 D S.01 D-EM D-EM 11' - 0" A6.11 4 MI.01 D Y 3 A5.1.2 MI.01 MI.01 MI.01 MI.01 MI.01 MI.01 MI.01 2012 2185 2186 2184 2183 2151 2143 2142 2141 2132 2121 21122111 2101 20922091 2084 2082 2081 2034 2031 2032 2023 2022 2021 2011 MI.01 A MI.05 MI.11 MW-01 A N N N S PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:51:14 PM 2308 REFLECTED CEILING PLAN MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.2.2B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1BUILDING B LEVEL 2 REFLECTED CEILING PLAN 25 NOTE: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING A +42"+42"+42" +42"+42" A A A R2 S1 S3 S4 1 A5.1.0 3 A5.1.0 R1 S2 1 A4.1.0 2 A4.1.0 74' - 8 1/2" MULTIPURPOSE ROOM 101 FURNITURE STORAGE 103BREAK ROOM 102 37' - 3 1/4" 9' - 11 3/4" 25' - 1 1/2" 39' - 7 1/4" 4 A5.1.0 4 A4.1.0 3 A4.1.0 2 A5.1.0 CEILING MOUNTED PROJECTOR ABOVE CEILING MOUNTED PROJECTOR ABOVE 9"9"7' - 11" PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA 3' - 8" 9" 7" 2' - 3" 11' - 6" 3' - 2"10' - 1" 9' - 6" 11' - 6" 24' - 0" 6' - 7" 5' - 10" 6' - 0" 4' - 8" 4' - 8" 5' - 8" 1' - 7" 2' - 2" 2' - 2" 1' - 0" 1' - 8" 4' - 10"11' - 2" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:51:18 PM 2308 FURNITURE, POWER AND DATA PLANS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.3.1A SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1BUILDING A LEVEL 1 FURNITURE, POWER & DATA FLOOR PLAN - PHASE1 25 NOTE: 1. ALL FURNITURE TO BE PROVIDED BY OWNER No.Description Date +4 2 " + 4 2 " AA U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 WORKSHOP 107 MATERIAL STORAGE 108 ELECTRICAL ROOM 109 CUSTODIAN CLOSET 110 ELEVATOR 111 LUNCH STORAGE 113 21' - 3" 9' - 10" 46' - 10" 21' - 3" MACHINE ROOM 112 ADA FAMILY RESTROOM 104 RESTROOM 114 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 4 A4.2.1 3 A4.2.1 7 A4.2.1 6 A4.2.1 5 A4.2.1 U2 ø 5' - 0" 2 A5.1.3 1 A5.1.4 V3 2 A4.2.1 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 77' - 11" 1 A4.2.1 X42 A4.2.0 12' - 8" 3 A5.1.2 +42" BLACK OUTLET ON PLYWOOD, TYP. +6" +6" 2' - 10" 3 ' - 3 " 8" 5 " 4 ' - 4 " BLACK OUTLET ON PLYWOOD, TYP. 8' - 8" PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA 42 " 4 2 " 4 2 " A6.5 8 13' - 9" 11' - 3" 4' - 4" 1' - 7 7/8" FLOOR BOX, TYP. 2' - 10" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:51:28 PM 2308 FURNITURE, POWER AND DATA PLANS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.3.1B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1BUILDING B LEVEL 1 FURNITURE, POWER & DATA FLOOR PLAN - PHASE 2 25 NOTE: 1. ALL FURNITURE TO BE PROVIDED BY OWNER No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING 3 A +42" +42" A A A A A +42" A A A A U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 SHARED OFFICE 218 LARGE OFFICE 203 MEETING ROOM 207 IT ROOM 206 LARGE OFFICE 208 MEDIUM OFFICE 209 SMALL OFFICE 210 SMALL OFFICE 213 STORAGE 216STAFF RESTROOM 217 MEDIUM OFFICE 214 81' - 2 1/2" 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 25' - 9 7/8" 43' - 10 3/4" 10' - 4 3/8" 23' - 0 3/4" 10' - 5 5/8" SMALL OFFICE 212 SMALL OFFICE 211 MEDIUM OFFICE 202 CLOSET 204 CLOSET 205 CLOSET 219 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 U2 2 A5.1.3 1 A5.1.4 V3 2 A4.2.1 21' - 3" 9' - 10" 46' - 10" 77' - 11" 21' - 3" X42 A4.2.0 6" 15' - 8" 3' - 4" 3 A5.1.2 +6" +6" +6" +6" BLACK OUTLET ON PLYWOOD, TYP. BLACK OUTLET ON PLYWOOD, TYP. BLACK OUTLET ON PLYWOOD, TYP. PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA PROVIDE CAT6 FOR SECURITY CAMERA +6" +6" BLACK OUTLET ON PLYWOOD, TYP. 2' - 9"3" 1' - 0" 1' - 0"6" 4' - 8" 2' - 10" 4' - 0" 2' - 3" 3' - 10" 10" 6" 2' - 6" 3' - 3" 1' - 3" 6" 4' - 4" 1' - 1" 3' - 3" 1' - 3" 7" 4' - 0" 7" 4' - 0" 1' - 1" 3' - 3" 1' - 1" 3' - 3" 1' - 3" 1' - 3" 7" 4' - 0" 7" 4' - 0" 1' - 0" 1' - 1" 3' - 3" 7" 4' - 0" 1' - 1" 3' - 3" 7"7"2' - 4" 11" 6" 3' - 1"7" 6' - 10" 8" 8" 3' - 7" 5' - 0" 1' - 9" 9"6"5' - 9" 7"10" MI.15 MI.15 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:51:39 PM 2308 FURNITURE, POWER AND DATA PLANS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.3.2B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1BUILDING B LEVEL 2 FURNITURE, POWER & DATA FLOOR PLAN - PHASE 2 25 NOTE: 1. ALL FURNITURE TO BE PROVIDED BY OWNER No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING R2 S1 S3 S4 1 A5.1.0 3 A5.1.0 R1 S2 1 A4.1.0 2 A4.1.0 4 A5.1.0 4 A4.1.0 3 A4.1.0 2 A5.1.0 FURNITURE STORAGE 103 BREAK ROOM 102 103A 102A 102B 101O 101A 101C 101D 101E 101F 101G 101H 101I 101K 101L 101M 101N 101J D D A A A A B C B C A 101B I MULTIPURPOSE ROOM 101 SIGNAGE LEGEND A SIGN TYPE A - EXIT SIGNAGE - 3/G05.2 SIGN TYPE B - EXIT ROUTE SIGNAGE - 4/G05.2B SIGN TYPE C - EVACUATION SIGNAGE - 5/G05.2 SIGN TYPE D - ROOM IDENTIFICATION SIGNAGE - 6/G05.2 C D SIGN TYPE E - ALL GENDER MULTI-USER RESTROOM SIGNAGE - 7/G05.2E SIGN TYPE F - ADA RESTROOM SIGNAGE - 10/G05.2 F SIGN TYPE G - ADA RESTROOM DOOR SIGNAGE - 11/G05.2G SIGN TYPE H - ELEVATOR SIGNAGE - 12/G05.2H SIGN TYPE I - MAXIMUM ROOM OCCUPANCY SIGNAGE - 2/A3.4.1AI SIGN TYPE J - ADA RESTROOM DIRECTION SIGNAGE - 2/A3.4.1BJ 6 6 MAXIMUM OCCUPANCY SIGNAGE (TACTILE) - WHERE OCCURS MAXIMUM OCCUPANCY MAXIMUM OCCUPANCY: 329 PERSONS 9" 6 " 1/2" MARINE PLYWOOD, FINISHED WITH 3 COATS OF WTER BASED POLYURETHANE, SEMI GLOSS WITH 3M ADHESIVE FILM 1/32" RAISED GRAVOTAC(COLOR 37058) OR SIMILAR, 60PT FUTURA MD BT, TRACKING 150 1/16" BALLS FOR BRAILLE PRESS FIT 329 PERSONS 48" MIN. 48" MIN ABOVE THE FINISH FLOOR MEASURED FROM THE BASELINE OF THE BRAILLE 1/4" = 1'-0"1BUILDING A LEVEL 1 SIGNAGE PLAN - PHASE 1 NOTES: 1. REFER TO SHEET G0.5.2 FOR SIGNAGE DETAILS. 1/2" = 1'-0"2(SIGN TYPE I) MAXIMUM ROOM OCCUPANCY SIGNAGE PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:07:41 AM 2308 SIGNAGE PLAN MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A3.4.1A SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 25 No.Description Date 3 PC01 CORRECTIONS 03/28/25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 4 A4.2.1 3 A4.2.1 7 A4.2.1 6 A4.2.1 5 A4.2.1 U2 2 A5.1.3 1 A5.1.4 V3 WORKSHOP 107 MATERIAL STORAGE 108 ELECTRICAL ROOM 109 CUSTODIAN CLOSET 110 ELEVATOR 111 LUNCH STORAGE 113 ADA FAMILY RESTROOM 104 MACHINE ROOM 112 106A 107A 108A 112A 106B 113A TICKET BOOTH 105 RESTROOM 114 114A 114B 114C 114D 114F 108B LOWER HUB 106 107B 104A 109A 115B 115A 107C MI.10 D D A D H H A A D F D 2 A4.2.1 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 21' - 3"9' - 10"46' - 10" 77' - 11" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 21 ' - 3 " 1 A4.2.1 X42 A4.2.0 3 A5.1.2 D J DD STORAGE 115 E A6.5 8 114E G COMBINED CIRCLE AND TRIANGLE SYMBOL, DO NOT PROVIDE ISA SYMBOL J PROVIDE A SIGNAGE INDICATING GATE TO BE OPEN DURING BUSSINESS HOURS SIGNAGE LEGEND A SIGN TYPE A - EXIT SIGNAGE - 3/G05.2 SIGN TYPE B - EXIT ROUTE SIGNAGE - 4/G05.2B SIGN TYPE C - EVACUATION SIGNAGE - 5/G05.2 SIGN TYPE D - ROOM IDENTIFICATION SIGNAGE - 6/G05.2 C D SIGN TYPE E - ALL GENDER MULTI-USER RESTROOM SIGNAGE - 7/G05.2E SIGN TYPE F - ADA RESTROOM SIGNAGE - 10/G05.2F SIGN TYPE G - ADA RESTROOM DOOR SIGNAGE - 11/G05.2G SIGN TYPE H - ELEVATOR SIGNAGE - 12/G05.2H SIGN TYPE I - MAXIMUM ROOM OCCUPANCY SIGNAGE - 2/A3.4.1AI SIGN TYPE J - ADA RESTROOM DIRECTION SIGNAGE - 2/A3.4.1BJ 1' - 3" 7 " 1/2" MARINE PLYWOOD, FINISHED WITH 3 COATS OF WTER BASED POLYURETHANE, SEMI GLOSS WITH 3M ADHESIVE FILM 1/32" RAISED GRAVOTAC(COLOR 37058) OR SIMILAR, 80PT FUTURA MD BT, TRACKING 150 INTERNATIONAL SYMBOL OF ACCESSIBILITY PER 8/G0.5.2 COLOR: BLUE COLOR: WHITE COLOR: CONTRASTING ACCESSIBLE RESTROOM 1/16" BALLS FOR BRAILLE PRESS FIT ACCESSIBLE RESTROOM 3 " 48 " M I N . 48" MIN ABOVE THE FINISH FLOOR MEASURED FROM THE BASELINE OF THE BRAILLE PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/ 2 9 / 2 0 2 5 3 : 2 5 : 4 7 P M 2308 SIGNAGE PLAN MAY 30, 2025 PLAN CHECK SUBMITTAL 04 A3.4.1B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 30, 2025 25 1/4" = 1'-0"1BUILDING B LEVEL 1 SIGNAGE PLAN - PHASE 2 NOTES: 1. REFER TO SHEET G0.5.2 FOR SIGNAGE DETAILS. No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 7 PC SUBMITTAL 04 05/30/25 1/2" = 1'-0"2(SIGN TYPE J) ADA RESTROOM DIRECTION SIGNAGE EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING 7 7 U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 U2 2 A5.1.3 1 A5.1.4 V3 SHARED OFFICE 218 LARGE OFFICE 203 MEETING ROOM 207IT ROOM 206 LARGE OFFICE 208 MEDIUM OFFICE 209 SMALL OFFICE 210 SMALL OFFICE 213 STORAGE 216 MEDIUM OFFICE 214 SMALL OFFICE 212 SMALL OFFICE 211 MEDIUM OFFICE 202 CLOSET 204 CLOSET 205 CLOSET 219 206A 203A 204A 208A 205A 209A 210A 211A 212A 213A 214A 217A 216A 218A 219A UPPER HUB 201 BREAK ROOM 215 215A DK-01 TERRACE STAFF RESTROOM 217 H H D D D D D D D A D D D D D D D D D A B C 2 A4.2.1 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 21' - 3"9' - 10"46' - 10" 77' - 11" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 21' - 3" X42 A4.2.0 3 A5.1.2 E E SIGNAGE LEGEND A SIGN TYPE A - EXIT SIGNAGE - 3/G05.2 SIGN TYPE B - EXIT ROUTE SIGNAGE - 4/G05.2B SIGN TYPE C - EVACUATION SIGNAGE - 5/G05.2 SIGN TYPE D - ROOM IDENTIFICATION SIGNAGE - 6/G05.2 C D SIGN TYPE E - ALL GENDER MULTI-USER RESTROOM SIGNAGE - 7/G05.2E SIGN TYPE F - ADA RESTROOM SIGNAGE - 10/G05.2 F SIGN TYPE G - ADA RESTROOM DOOR SIGNAGE - 11/G05.2G SIGN TYPE H - ELEVATOR SIGNAGE - 12/G05.2H SIGN TYPE I - MAXIMUM ROOM OCCUPANCY SIGNAGE - 2/A3.4.1AI SIGN TYPE J - ADA RESTROOM DIRECTION SIGNAGE - 2/A3.4.1BJ 6 6 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:08:00 AM 2308 SIGNAGE PLAN MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A3.4.2B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 25 1/4" = 1'-0"1BUILDING B LEVEL 2 SIGNAGE PLAN - PHASE 2 NOTES: 1. REFER TO SHEET G0.5.2 FOR SIGNAGE DETAILS. No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING 6 R2 S1 S3 S4 1 A5.1.0 3 A5.1.0 R1 S2 1 A4.1.0 2 A4.1.0 4 A5.1.0 4 A4.1.0 3 A4.1.0 2 A5.1.0 37' - 3 1/4" 9' - 11 3/4" 25' - 1 1/2" 39' - 7 1/4" 0' - 0" +0' - 14" +0' - 14" +0' - 14" +0' - 14" +0' - 14" +0' - 14" +0' - 14" 17' - 9" 2' - 2 5/8" 3' - 0" 2' - 6 7/8" 2' - 1 1/8" 3' - 0" 2' - 2 5/8" 17' - 9" 3 /4" 3' - 0"10 5/8" 6' - 0" 3' - 7 1/8" 3' - 11" 12' - 7 5/8" TYP. 12' - 0" TYP. 12' - 0" TYP. CONTROL JOINT 8 3/4" +0' - 14" 7 7/8" 7 7/8" +0' - 14" 7 7/8" 8 3/4" 11 5/8" 11 5/8" +0' - 6" 11 5/8" 11 5/8" 7 7/8" +0' - 6" PREPARE RECESS IN SLAB PER INSTRUCTIONS BY 'BASE SPECIALTIES' FOR THE BASE MAT, TYP. 13' - 0 1/2" 6' - 0" 3' - 0" 3' - 0" 18' - 2" 10 A8.7 10 A8.7 10 A8.7 10 A8.7 +0' - 6" +0' - 6" 3" -0' - 0 7/16" +0' - 0" 2" 3" 2" -0' - 0 7/16" +0' - 0" 3' - 0" 3"2" -0' - 0 7/16" +0' - 0" 2" 3" 3' - 0" -0' - 0 7/16" +0' - 0" 3' - 0" 6' - 0" 3' - 0" CURB PER DETAIL 2/A8.4 CURB PER DETAIL 3/A8.4 CURB PER DETAIL 3/A8.4 CURB PER DETAIL 2/A8.4 PREPARE RECESS IN SLAB PER INSTRUCTIONS BY 'BASE SPECIALTIES' FOR THE BASE MAT, TYP. PREPARE RECESS IN SLAB PER INSTRUCTIONS BY 'BASE SPECIALTIES' FOR THE BASE MAT, TYP. +0' - 4" (PAD FOR SWITCHGEAR) PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:52:18 PM 2308 SLAB PLAN MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.5.1A SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1/4" = 1'-0"1BUILDING A LEVEL 1 SLAB PLAN - PHASE 1 NOTES: 1) CONTROL JOINT PER STRUCTURAL DETAIL 5/S5.01 2) ALL CURBS TO BE CO-02 3) ELEVATOR PIT TO BE WATERPROOFED WITH WRB-02 4) INCLUDE WRB-02 AT ALL FOUNDATIONS WHERE EXTERIOR GRADE ELEVATION IS AT/ABOVE ELEVATION OF INTERIOR SPACE. WHERE WRB-02 IS EXPOSED, FINISH WITH FLASHING. No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A4.2.0 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 4 A4.2.1 3 A4.2.1 7 A4.2.1 6 A4.2.1 5 A4.2.1 U2 2 A5.1.3 1 A5.1.4 V3 1% MIN 1% MIN 1% MIN 1% MIN 1% MIN 1% MIN1% MIN 1% MIN 9' - 11 3/8" +0' - 14" +0' - 14" 7' - 0" 8" 8" 1' - 10 7/8" 8' - 2 5/8" 8" 8" +0' - 14" TO UNDERSIDE OF DECK +16' - 5 1/2" 18' - 2 3/8" 6' - 0" 6' - 11" 8' - 0 1/8" 9' - 9 1/2" 8' - 0" 2' - 2 1/4" 3' - 0" 5' - 1 5/8" 4' - 2" 9' - 8" 1' - 5 7/8" 3' - 0 1/2" 5' - 2" 4' - 0" 6' - 10 1/2" 11' - 10" 6' - 1 1/2" 4" TO UNDERSIDE OF DECK 5' - 7 1/2" TO UNDERSIDE OF DECK TO UNDERSIDE OF DECK TO UNDERSIDE OF DECK TO UNDERSIDE OF DECK 1% MIN 1% MIN +16' - 5 1/2" -4' - 0" +16' - 5 1/2" +0' - 0" +0' - 0" +0'-3/4" +0' - 0" 1% MIN 1% MIN 1% MIN +0' - 0" +0' - 0" 2 A4.2.1 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 21' - 3" 9' - 10" 46' - 10" 77' - 11" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 21' - 3" 1 A4.2.1 X42 A4.2.0 3 A5.1.2 TYP. CONTROL JOINT TYP. 12' - 0" TYP. 12' - 0" 12' - 11 5/8" 10 A8.7 8 3/4" 8 3/4" +0' - 14" 8 3/4" 7 1/8" 11 1/4" 8 3/4" 8 3/4" 7 1/8" 11 1/4" 8" 1' - 10 3/4" 8' - 0" 8" 1' - 4" 6' - 0" 3' - 0" 10 A8.7 5" 3' - 0" 1' - 7 1/4" 3' - 0" 10 A8.7+0' - 0" -0'-1 1/16" - 0'-3/4" - 0'-3/4" +0'-0" 1% MIN1% MIN +0' - 0" 3" -0' - 0 7/16" +0' - 0" PREPARE RECESS IN SLAB PER INSTRUCTIONS BY 'BASE SPECIALTIES' FOR THE BASE MAT, TYP. +1' - 2 5/8" A8.7 9 3' - 11" 3"2' - 2" 3" 7' - 8 3/4" 3" 10' - 11 3/4" 3" 2' - 2" +0' - 6" CURB PER DETAIL 3/A8.4 2' - 7 1/8" 3' - 0 5/8" 29' - 0 3/8" +1' - 4" +1' - 4" SEE SHEET A6.14 FOR MORE DETAIL ON DEPRESSION IN CONCRETE SLAB AT GATE TRACK 2" 3" -0' - 0 7/16" +0' - 0" PREPARE RECESS IN SLAB PER INSTRUCTIONS BY 'BASE SPECIALTIES' FOR THE BASE MAT, TYP. PREPARE RECESS IN SLAB PER INSTRUCTIONS BY 'BASE SPECIALTIES' FOR THE BASE MAT, TYP. 2" 1' - 8 7/8" 3' - 0" 3' - 0" 3" 2" -0' - 0 7/16" +0' - 0" +0'-2" +0'-2" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:52:27 PM 2308 SLAB PLAN MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.5.1B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1/4" = 1'-0"1BUILDING B LEVEL 1 SLAB PLAN - PHASE 2 NOTES: 1) CONTROL JOINT PER STRUCTURAL DETAIL 5/S5.01 2) ALL CURBS TO BE CO-02 3) ELEVATOR PIT TO BE WATERPROOFED WITH WRB-02 4) SEE SHEETS A8.3 AND A8.4 FOR DETAILS OF CONCRETE AT OPENINGS No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING U6 U1 V1 V2 V4 V5 2 A5.1.1 2 A5.1.5 2 A5.1.7 Y1 X1 Y2 1 A5.1.3 X2 X3 U5 U4 U3 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 2 A5.1.4 1 A5.1.6 1 A5.1.5 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 1 A5.1.7 U2 2 A5.1.3 1 A5.1.4 V3 12' - 11 1/2" +16' - 5 1/2" +16' - 5 1/2" CONCRETE DECK PER STRUCTURAL 5' - 2 1/4" 1/2" +16' - 5 1/2" 8' - 8 1/8" 7' - 0"3 5/8" 10' - 1 5/8" 16' - 0" 7' - 2 1/2" 1' - 0" 6 1/4" 7 1/8" 7 1/8" 7 1/8" 7" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 43' - 10 3/4" 21' - 3" 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 81' - 2 1/2" 21' - 3" 9' - 10" 46' - 10" 77' - 11" X4 7 1/8" 3 A5.1.2 +0' - 6" 9" +12' - 9 1/4" AREA DRAINS AT TERRACE; SEE 11/A8.7 +12' - 9 1/4" PROVIDE CONCRETE TOPPING TO ACHIEVE DESIRED THICKNESS AND SLOPES +12' - 11" AREA DRAINS AT TERRACE; SEE 11/A8.7 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:52:31 PM 2308 SLAB PLAN MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A3.5.2B SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1/4" = 1'-0"1BUILDING B LEVEL 2 SLAB PLAN - PHASE 2 1% MIN 1% MIN 1% MIN 1% MIN NOTES: 1) CONTROL JOINT PER STRUCTURAL DETAIL 5/S5.01 2) ALL CURBS TO BE CO-02 3) ELEVATOR PIT TO BE WATERPROOFED WITH WRB-02 No.Description Date LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" Y1 Y2 1 A5.0.1 2 A5.0.1 BUILDING B PHASE 2 BUILDING A PHASE 1 BUILDING A PHASE 1 BUILDING B PHASE 2 LEVEL 01 (SEE 1/A3.0.1) 0' -0" Y1Y2 1 A5.0.1 2 A5.0.1 BOARD FORMED CONCRETE NOTES: 1) FORMWORK: THE FORMING BOARDS FOR CONCRETE WALLS WILL BE MADE FROM DOUGLAS FIR, MEASURING 6 INCHES WIDE AND AT LEAST 3/4 INCH THICK. THE BOARDS ARE TO BE SANDBLASTED PRIOR TO PLACEMENT AND EDGES SHALL BE SMOOTHENED TO PREVENT SPLINTERS. THE BOARDS MUST SUPPORT WET CONCRETE WITH A MINIMUM LOAD CAPACITY OF 3000 PSI AND REMAIN STRAIGHT WITHIN A TOLERANCE OF ±1/8 INCH OVER 10 FEET. INSTALLATION REQUIRES PROPER ALIGNMENT AND SECURING WITH RUST- RESISTANT FASTENERS. 2) PATCH FORM TIE HOLES AT CONCRETE: AFTER REMOVING FORM TIES FROM THE CONCRETE WALLS, CLEAN THE SURROUNDING AREA AND FILL THE HOLES WITH A HIGH- QUALITY, CEMENT-BASED PATCHING COMPOUND. SMOOTH THE SURFACE TO MATCH THE SURROUNDING TEXTURE, AND ALLOW THE PATCH TO CURE. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:52:37 PM 2308 KEY ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A4.0.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 3/16" = 1'-0"1KEY ELEVATION NORTH 3/16" = 1'-0"2KEY ELEVATION SOUTH 25 No.Description Date LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" X1X2X3X4 BUILDING A PHASE 1 BUILDING B PHASE 2 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" X1 X2 X3 X4 BUILDING B PHASE 2 BUILDING A PHASE 1 BOARD FORMED CONCRETE NOTES: 1) FORMWORK: THE FORMING BOARDS FOR CONCRETE WALLS WILL BE MADE FROM DOUGLAS FIR, MEASURING 6 INCHES WIDE AND AT LEAST 3/4 INCH THICK. THE BOARDS ARE TO BE SANDBLASTED PRIOR TO PLACEMENT AND EDGES SHALL BE SMOOTHENED TO PREVENT SPLINTERS. THE BOARDS MUST SUPPORT WET CONCRETE WITH A MINIMUM LOAD CAPACITY OF 3000 PSI AND REMAIN STRAIGHT WITHIN A TOLERANCE OF ±1/8 INCH OVER 10 FEET. INSTALLATION REQUIRES PROPER ALIGNMENT AND SECURING WITH RUST- RESISTANT FASTENERS. 2) PATCH FORM TIE HOLES AT CONCRETE: AFTER REMOVING FORM TIES FROM THE CONCRETE WALLS, CLEAN THE SURROUNDING AREA AND FILL THE HOLES WITH A HIGH- QUALITY, CEMENT-BASED PATCHING COMPOUND. SMOOTH THE SURFACE TO MATCH THE SURROUNDING TEXTURE, AND ALLOW THE PATCH TO CURE. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:52:43 PM 2308 KEY ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A4.0.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 3/16" = 1'-0"1KEY ELEVATION WEST 3/16" = 1'-0"2KEY ELEVATION EAST 25 No.Description Date LEVEL 01 (SEE 1/A3.0.1) 0' -0" S1S3S4 3 A5.1.0 S2 4 A5.1.0 TI-01 WD-01 S.01S.01 21' - 1 1/2" 20 A8.6 20 A8.6 7' - 0" N EQEQ 7' - 0" EQEQ N LEVEL 01 (SEE 1/A3.0.1) 0' -0" S1 S3 S4 3 A5.1.0 S2 4 A5.1.0 TI-01 GL-01 21' - 1 1/2" SECURITY GATE IN CLOSED POSITION S.01 20 A8.6 20 A8.6 22 A8.6 22 A8.6 N 6' - 7" R2 1 A5.1.0 R1 WD-01GL-01 S.01 2 A5.1.0 20 A8.6 20 A8.6 7' - 0" N SIGNAGE UNDER SEPARATE PERMIT R2 1 A5.1.0 R1 WD-01 S.01 10' - 10 1/8" 3' - 11" 2 A5.1.0 20 A8.6 20 A8.6 FDC CONNECTION BLACK ANODIZED ALUMINUM, 2" DEEP, 1" STROKE, 6" HEIGHT, CUSTOM FONT BOARD FORMED CONCRETE NOTES: 1) FORMWORK: THE FORMING BOARDS FOR CONCRETE WALLS WILL BE MADE FROM DOUGLAS FIR, MEASURING 6 INCHES WIDE AND AT LEAST 3/4 INCH THICK. THE BOARDS ARE TO BE SANDBLASTED PRIOR TO PLACEMENT AND EDGES SHALL BE SMOOTHENED TO PREVENT SPLINTERS. THE BOARDS MUST SUPPORT WET CONCRETE WITH A MINIMUM LOAD CAPACITY OF 3000 PSI AND REMAIN STRAIGHT WITHIN A TOLERANCE OF ±1/8 INCH OVER 10 FEET. INSTALLATION REQUIRES PROPER ALIGNMENT AND SECURING WITH RUST- RESISTANT FASTENERS. 2) PATCH FORM TIE HOLES AT CONCRETE: AFTER REMOVING FORM TIES FROM THE CONCRETE WALLS, CLEAN THE SURROUNDING AREA AND FILL THE HOLES WITH A HIGH- QUALITY, CEMENT-BASED PATCHING COMPOUND. SMOOTH THE SURFACE TO MATCH THE SURROUNDING TEXTURE, AND ALLOW THE PATCH TO CURE. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:52:56 PM 2308 BUILDING A ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A4.1.0 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1BUILDING A SOUTH ELEVATION - PHASE 1 1/4" = 1'-0"2BUILDING A NORTH ELEVATION - PHASE 1 1/4" = 1'-0"3BUILDING A WEST ELEVATION - PHASE 1 1/4" = 1'-0"4BUILDING A EAST ELEVATION - PHASE 1 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING NOTE: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" 2 A5.1.1 X1 X2 X3 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 CO-02 WD-01 CO-02 TI-01 GL-01 S.01 X4 3 A5.1.2 20 A8.6 26 A8.6 10' - 1" EQ. EQ. TYP. TIE HOLE 6 A8.7 BLACK ANODIZED ALUMINUM, 2" DEEP, 1" STROKE, 6" HEIGHT, CUSTOM FONT 7 A8.7 FDCTB.02 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" U6 U1 2 A5.1.5 U5 U4 U3 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 WD-01 WD-01 TI-01 CO-02 CO-02 U2 25 A8.6 24 A8.6 26 A8.6 20 A8.6 26 A8.6 26 A8.6 7' - 0" N S.01 9' - 2" MI.06 MI.16 MI.16 BOARD FORMED CONCRETE NOTES: 1) FORMWORK: THE FORMING BOARDS FOR CONCRETE WALLS WILL BE MADE FROM DOUGLAS FIR, MEASURING 6 INCHES WIDE AND AT LEAST 3/4 INCH THICK. THE BOARDS ARE TO BE SANDBLASTED PRIOR TO PLACEMENT AND EDGES SHALL BE SMOOTHENED TO PREVENT SPLINTERS. THE BOARDS MUST SUPPORT WET CONCRETE WITH A MINIMUM LOAD CAPACITY OF 3000 PSI AND REMAIN STRAIGHT WITHIN A TOLERANCE OF ±1/8 INCH OVER 10 FEET. INSTALLATION REQUIRES PROPER ALIGNMENT AND SECURING WITH RUST- RESISTANT FASTENERS. 2) PATCH FORM TIE HOLES AT CONCRETE: AFTER REMOVING FORM TIES FROM THE CONCRETE WALLS, CLEAN THE SURROUNDING AREA AND FILL THE HOLES WITH A HIGH- QUALITY, CEMENT-BASED PATCHING COMPOUND. SMOOTH THE SURFACE TO MATCH THE SURROUNDING TEXTURE, AND ALLOW THE PATCH TO CURE. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:53:10 PM 2308 BUILDING B ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A4.2.0 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"2BUILDING B EAST ELEVATION 01 - PHASE 2 1/4" = 1'-0"1BUILDING B WEST ELEVATION 01 - PHASE 2 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING NOTE: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" Y1Y2 1 A5.1.3 2 A5.1.4 CO-02 TI-01 WD-01 CO-02 PT-01 SECURITY GATE IN CLOSED POSITION 1 A5.1.4 20 A8.6 20 A8.6 26 A8.6 21 A8.6 VERTICAL CLEARANCE 7' - 5"10' - 1" PLANTER/BENCH PROPOSED AS A BARRIER FOR THE VERTICAL CLEARANCE LESS THAN 7'-2" VERTICAL CLEARANCE 7' - 0 1/2"3 3 LEVEL 01 (SEE 1/A3.0.1) 0' -0" X1 CO-02 21 A8.6 LEVEL 01 (SEE 1/A3.0.1) 0' -0" V5 1 A5.1.6 WD-01 26 A8.6 21 A8.6 MI.16 V4 V5 1 A5.1.6 WD-01 V3 21 A8.6 26 A8.6 SIM. 8' - 4" S.01 9' - 2" 1 A5.1.2 CO-02 3 A5.1.2 21 A8.6 SIM. LEVEL 01 (SEE 1/A3.0.1) 0' -0" Y2 CO-02 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" Y1 Y2 1 A5.1.3 2 A5.1.4 1 A5.1.4 CO-02 CO-02 WD-01 WD-01 26 A8.6 26 A8.6 26 A8.6 S.01 9' - 0" BOARD FORMED CONCRETE NOTES: 1) FORMWORK: THE FORMING BOARDS FOR CONCRETE WALLS WILL BE MADE FROM DOUGLAS FIR, MEASURING 6 INCHES WIDE AND AT LEAST 3/4 INCH THICK. THE BOARDS ARE TO BE SANDBLASTED PRIOR TO PLACEMENT AND EDGES SHALL BE SMOOTHENED TO PREVENT SPLINTERS. THE BOARDS MUST SUPPORT WET CONCRETE WITH A MINIMUM LOAD CAPACITY OF 3000 PSI AND REMAIN STRAIGHT WITHIN A TOLERANCE OF ±1/8 INCH OVER 10 FEET. INSTALLATION REQUIRES PROPER ALIGNMENT AND SECURING WITH RUST- RESISTANT FASTENERS. 2) PATCH FORM TIE HOLES AT CONCRETE: AFTER REMOVING FORM TIES FROM THE CONCRETE WALLS, CLEAN THE SURROUNDING AREA AND FILL THE HOLES WITH A HIGH- QUALITY, CEMENT-BASED PATCHING COMPOUND. SMOOTH THE SURFACE TO MATCH THE SURROUNDING TEXTURE, AND ALLOW THE PATCH TO CURE. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:53:24 PM 2308 BUILDING B ELEVATION MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A4.2.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1BUILDING B SOUTH ELEVATION 01 1/4" = 1'-0"4BUILDING B WEST ELEVATION 02 1/4" = 1'-0"3BUILDING B SOUTH ELEVATION 02 1/4" = 1'-0"7BUILDING B NORTH ELEVATION 01 1/4" = 1'-0"6BUILDING B WEST ELEVATION 03 1/4" = 1'-0"5BUILDING B SOUTH ELEVATION 03 1/4" = 1'-0"2BUILDING B NORTH ELEVATION 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date 3 PC01 CORRECTIONS 03/28/25 4 FIRE MASTER PLAN SUBMITTAL 03 01/29/25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING NOTE: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" X1 X2 X3 X4 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" X1X2X3 X4 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:53:31 PM 2308 KEY SECTIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A5.0.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 3/16" = 1'-0"2LONGITUDINAL BUILDING SECTION 2 3/16" = 1'-0"1LONGITUDINAL BUILDING SECTION 1 25 No.Description Date LEVEL 01 (SEE 1/A3.0.1) 0' -0" S1S3S4 3 A5.1.0 S2 4 A5.1.0 A7.1 9 A7.1 8 MULTIPURPOSE ROOM 101 BREAK ROOM 102 A7.1 8 A7.1 7OPP. A1 B1 B1 C2 A7.1 10 C1 C1 C2 R2 1 A5.1.0 R1 2 A5.1.0 A7.1 4 A7.1 3 A7.1 5 A7.1 1 BREAK ROOM 102 FURNITURE STORAGE 103 B4 C2 B1 A1 C2 C2 R2 1 A5.1.0 R1 2 A5.1.0 A7.1 4 A7.1 3 MULTIPURPOSE ROOM 101 A7.1 2 B4 A1 SIM. C2 C1 LEVEL 01 (SEE 1/A3.0.1) 0' -0" S1 S3 S4 3 A5.1.0 S2 4 A5.1.0 A7.1 8 A7.1 6 FURNITURE STORAGE 103 MULTIPURPOSE ROOM 101 12' - 0" A7.1 8 MI.10 OPP. A7.1 7 A7.1 9 C2 A1 B1 OPP.OPP. C1 C1C2 FLOOR/ROOF/CEILING TYPE KEY CONCRETE SLAB ON GRADE, SEE 28/A8.1A1 CONCRETE METAL DECK FLOOR AT LEVEL 02, SEE 29/A8.1A2 DRYWALL CEILING, SEE 30/A8.1B1 ACT CEILING, SEE 1/A8.2B2 PLYWOOD CEILING, SEE 2/A8.2B3 BUILDING A ROOF AT MPR, SEE 4/A8.2C1 BUILDING A ROOF W/ DRYWALL, SEE 5/A8.2C2 BUILDING B ROOF 01, SEE 6/A8.2C3 BUILDING B ROOF 02, SEE 7/A8.2C4 TILE SOFFIT, SEE 3/A8.2B4 BUILDING B ELEVATOR ROOF, SEE 8/A8.2C5 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:53:45 PM 2308 BUILDING SECTIONS BUILDING A MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A5.1.0 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1LONGITUDINAL SECTION FACING NORTH 1/4" = 1'-0"4BREAK ROOM SOFFIT 1/4" = 1'-0"3CROSS SECTION AT MPR 1/4" = 1'-0"2LONGITUDINAL SECTION AT FURNITURE STORAGE 25 NOTES: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" Y1Y2 1 A5.1.3 2 A5.1.4 TI-02 1 A5.1.4 A7.2 4 A7.6 3 A7.3 8 A7.4 11 A7.4 10 A7.3 10 A7.4 2 A7.2 10 MEETING ROOM 207 MEDIUM OFFICE 209 RESTROOM 114 ADA FAMILY RESTROOM 104 12' - 5 1/4" A7.3 8 OPP. A1 A2 C3 C4C4 B4 B1 B1 B2 B2 FUR CEILING FLUSH LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" Y1Y2 1 A5.1.3 2 A5.1.4 1 A5.1.4 A7.2 5 A7.3 11 A7.3 6 A7.2 10 UPPER HUB 201 SMALL OFFICE 211 LOWER HUB 106 10' - 1" A1 B1 A2 B4 C3 C4C4 B2 SIM. FUR CEILING FLUSH 7' - 0" N Y1 Y2 1 A5.1.3 2 A5.1.4 1 A5.1.4 A7.6 9 A7.3 12 A7.6 6 A7.6 5 WORKSHOP 107 CUSTODIAN CLOSET 110 UPPER HUB 201 SMALL OFFICE 212 A7.4 2 A7.3 11 OPP. A7.2 10 OPP. C3C4 A2 A1 B4 B2 A7.6 13 SIM. C5 A1 ELEVATOR 111 Y1 Y2 1 A5.1.3 2 A5.1.4 1 A5.1.4 A7.4 7 A7.6 9 A7.3 12 MACHINE ROOM 112 ELECTRICAL ROOM 109 WORKSHOP 107 CLOSET 219 UPPER HUB 201 STAFF RESTROOM 217 UPPER HUB 201 SMALL OFFICE 212 A7.6 8 CUSTODIAN CLOSET 110 A7.3 10 A7.3 12 A7.4 7 OPP. A7.3 11 OPP. A7.3 4 A7.2 10 OPP. A1 A2 B4 C4 C3 C4 B1 B1B3B2 SIM. A7.2 2 B1 FLOOR/ROOF/CEILING TYPE KEY CONCRETE SLAB ON GRADE, SEE 28/A8.1A1 CONCRETE METAL DECK FLOOR AT LEVEL 02, SEE 29/A8.1A2 DRYWALL CEILING, SEE 30/A8.1B1 ACT CEILING, SEE 1/A8.2B2 PLYWOOD CEILING, SEE 2/A8.2B3 BUILDING A ROOF AT MPR, SEE 4/A8.2C1 BUILDING A ROOF W/ DRYWALL, SEE 5/A8.2C2 BUILDING B ROOF 01, SEE 6/A8.2C3 BUILDING B ROOF 02, SEE 7/A8.2C4 TILE SOFFIT, SEE 3/A8.2B4 BUILDING B ELEVATOR ROOF, SEE 8/A8.2C5 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:54:03 PM 2308 BUILDING SECTIONS BUILDING B MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A5.1.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1CROSS SECTION AT BATHROOM 1/4" = 1'-0"2CROSS SECTION AT 1ST FLOOR HUB 1/4" = 1'-0"4CROSS SECTION AT CUSTODIAN ROOM 1/4" = 1'-0"3CROSS SECTION AT MACHINE ROOM 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT NOTES: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" Y1 Y2 1 A5.1.3 2 A5.1.4 1 A5.1.4 A7.3 4 A7.5 1 A7.6 2 SMALL OFFICE 213 UPPER HUB 201 STORAGE 216 UPPER HUB 201 SHARED OFFICE 218 WORKSHOP 107 A7.3 11 OPP. A7.3 11 A7.2 9 A7.5 1 OPP. A1 A2 B4 B2 C4 C3 C4 B4 A7.2 10 OPP. COLUMN FOOTING BEYOND 8' - 4" LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" Y1 Y2 1 A5.1.3 2 A5.1.4 1 A5.1.4 A7.6 2 SHARED OFFICE 218 BREAK ROOM 215 MEDIUM OFFICE 214 MATERIAL STORAGE 108 A7.2 9 B4 A2 A1 C4 C3 C4 B1 A7.2 3 A7.3 10 SIM. A7.3 11 SIM. 9' - 0" 7' - 6" Y1 Y2 1 A5.1.3 2 A5.1.4 1 A5.1.4 10' - 1" A6.15.1 3 A7.3 2 A2 8' - 4" STORAGE 115 Y1Y2 1 A5.1.3 2 A5.1.4 1 A5.1.4 A7.2 6 A7.3 3 A7.3 2 B4 A1 A2 MATERIAL STORAGE 108 8' - 7 1/2" FLOOR/ROOF/CEILING TYPE KEY CONCRETE SLAB ON GRADE, SEE 28/A8.1A1 CONCRETE METAL DECK FLOOR AT LEVEL 02, SEE 29/A8.1A2 DRYWALL CEILING, SEE 30/A8.1B1 ACT CEILING, SEE 1/A8.2B2 PLYWOOD CEILING, SEE 2/A8.2B3 BUILDING A ROOF AT MPR, SEE 4/A8.2C1 BUILDING A ROOF W/ DRYWALL, SEE 5/A8.2C2 BUILDING B ROOF 01, SEE 6/A8.2C3 BUILDING B ROOF 02, SEE 7/A8.2C4 TILE SOFFIT, SEE 3/A8.2B4 BUILDING B ELEVATOR ROOF, SEE 8/A8.2C5 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:54:18 PM 2308 BUILDING SECTIONS BUILDING B MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A5.1.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"2CROSS SECTION AT WORKSHOP 1/4" = 1'-0"1CROSS SECTION AT MATERIAL STORAGE 1/4" = 1'-0"4CROSS SECTION AT EXTERIOR STAIRS 1/4" = 1'-0"3CROSS SECTION AT LEVEL 02 TERRACE 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT NOTES: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" 2 A5.1.1 X1X2X3 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 A7.2 1 A7.3 7 A7.3 9 A7.6 12 A7.6 7 A7.2 7 A7.5 8 A7.6 11 ADA FAMILY RESTROOM 104 LOWER HUB 106 WORKSHOP 107 MEDIUM OFFICE 214 SMALL OFFICE 213 SMALL OFFICE 212 UPPER HUB 201 LARGE OFFICE 208 A7.3 12 SIM. A7.3 9 MATERIAL STORAGE 108 X4 A7.4 1 A7.3 1 A7.4 2 SIM. 3 A5.1.2 B4 B1 B1 A2 C3 B2 B2 B1 A1 A8.11 6 A2 STORAGE 115 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" U6 U1 2 A5.1.5 U5 U4 U3 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 U2 A7.3 5 A7.6 11 A7.5 8 A7.2 7 A7.6 7 RESTROOM 114 LOWER HUB 106 CUSTODIAN CLOSET 110 ELECTRICAL ROOM 109 BREAK ROOM 215 UPPER HUB 201 LARGE OFFICE 203 A7.3 12 SIM. A7.6 7 A7.3 12 OPP. A7.4 6 A1 A2 C3 B4 B1 B1 B1 B1 A7.2 11 OPP. COLUMN FOOTING BEYOND B4 10' - 6" 11' - 3" FLOOR/ROOF/CEILING TYPE KEY CONCRETE SLAB ON GRADE, SEE 28/A8.1A1 CONCRETE METAL DECK FLOOR AT LEVEL 02, SEE 29/A8.1A2 DRYWALL CEILING, SEE 30/A8.1B1 ACT CEILING, SEE 1/A8.2B2 PLYWOOD CEILING, SEE 2/A8.2B3 BUILDING A ROOF AT MPR, SEE 4/A8.2C1 BUILDING A ROOF W/ DRYWALL, SEE 5/A8.2C2 BUILDING B ROOF 01, SEE 6/A8.2C3 BUILDING B ROOF 02, SEE 7/A8.2C4 TILE SOFFIT, SEE 3/A8.2B4 BUILDING B ELEVATOR ROOF, SEE 8/A8.2C5 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:54:32 PM 2308 BUILDING SECTIONS BUILDING B MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A5.1.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"1LONGITUDINAL SECTION AT LEVEL 1 HUB 1/4" = 1'-0"2LONGITUDINAL SECTION AT ELECTRICAL ROOM 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT NOTES: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" 2 A5.1.1 X1X2X3 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 A7.3 1 A7.2 8 A7.5 4 A7.5 3 A7.5 5 A7.4 8 A7.5 9 WORKSHOP 107 LOWER HUB 106 RESTROOM 114 BREAK ROOM 215 STORAGE 216 UPPER HUB 201 MEETING ROOM 207 IT ROOM 206 LARGE OFFICE 203 MATERIAL STORAGE 108 X4 A7.4 1 A7.3 12 A7.4 12 A7.4 2 A7.2 7 A7.3 8 SIM. ? ? 3 A5.1.2 A1 A2 C3 B1 B2 B1 B1 B4 B3 SIM. COLUMN FOOTING BEYOND A2 11' - 3" STORAGE 115 A7.5 12 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" 2 A5.1.1 X1 X2 X3 1 A5.1.1 4 A5.1.1 3 A5.1.1 2 A5.1.2 1 A5.1.2 4 A5.1.2 A7.2 1 A7.3 12 A7.3 9 A7.3 9 A7.6 2 A7.6 2 WORKSHOP 107 TICKET BOOTH 105 ADA FAMILY RESTROOM 104 LARGE OFFICE 208 UPPER HUB 201 MEDIUM OFFICE 209 SMALL OFFICE 210 SMALL OFFICE 211 SMALL OFFICE 212 SMALL OFFICE 213 MEDIUM OFFICE 214 X4 A7.4 1 OPP. A7.3 1 OPP. A7.6 11 OPP. A7.4 2 OPP. A7.2 7 A7.5 8 OPP. A7.3 9 A7.3 9 A7.3 7 OPP. OPP. 3 A5.1.2 OPP. OPP. OPP. OPP. A1 A2 C4 B2B2 B2 B2B2 B4 SIM.OPP. OPP. OPP. A8.11 6 MATERIAL STORAGE 108 B1 B1 COLUMN FOOTING BEYOND B4 STORAGE 115 FLOOR/ROOF/CEILING TYPE KEY CONCRETE SLAB ON GRADE, SEE 28/A8.1A1 CONCRETE METAL DECK FLOOR AT LEVEL 02, SEE 29/A8.1A2 DRYWALL CEILING, SEE 30/A8.1B1 ACT CEILING, SEE 1/A8.2B2 PLYWOOD CEILING, SEE 2/A8.2B3 BUILDING A ROOF AT MPR, SEE 4/A8.2C1 BUILDING A ROOF W/ DRYWALL, SEE 5/A8.2C2 BUILDING B ROOF 01, SEE 6/A8.2C3 BUILDING B ROOF 02, SEE 7/A8.2C4 TILE SOFFIT, SEE 3/A8.2B4 BUILDING B ELEVATOR ROOF, SEE 8/A8.2C5 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:54:47 PM 2308 BUILDING SECTIONS BUILDING B MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A5.1.4 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"2SECTION AT HUB 01 GLASS DOOR 1/4" = 1'-0"1LONGITUDINAL SECTION AT TICKET BOOTH 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT NOTES: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" V1V2V4V5 2 A5.1.7 A7.5 7 A7.2 9 LARGE OFFICE 203 CLOSET 205 LARGE OFFICE 208 V3 A7.5 7 OPP. A7.2 9 B4 A2 B1 C3 C4C4 OPP. COLUMN FOOTING BEYOND FUR CEILING FLUSH 11' - 6" 11' - 6" 8' - 4" A7.5 11 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" 1 A5.1.7 A7.5 10 ADA FAMILY RESTROOM 104 RESTROOM 114 MEDIUM OFFICE 209 UPPER HUB 201 MEDIUM OFFICE 202 IT ROOM 206 UPPER HUB 201 A7.4 2 A7.4 10 A7.4 11 A7.4 2 OPP. A7.2 10 A7.3 11 A7.2 10 OPP. B1 B1 B4 A2 A1 B4 B2 B1 B3 B1 B2 C4 C3 C4 B1 A7.5 6 A7.5 10 OPP. A7.6 10 V1V2V4V5 2 A5.1.7 MEETING ROOM 207 SMALL OFFICE 210 RESTROOM 114 TICKET BOOTH 105 V3 A7.4 2 SIM. A7.4 11 A7.6 3 A7.2 10 A7.3 11 A7.3 8 OPP. A7.3 8 A7.2 4 A7.4 9 A1 B1 B4 B1B1 A2 C3 C4C4 B2 B2 SIM. FUR CEILING FLUSH V1 V2 V4 V5 2 A5.1.7 WORKSHOP 107 LOWER HUB 106 SMALL OFFICE 211 UPPER HUB 201 UPPER HUB 201 V3 A7.2 5 OPP. A7.4 2 OPP. A7.3 11 OPP. A7.2 10 OPP. A1 A2 B4 C4 C3 C4 B2 B1 FUR CEILING FLUSH A7.5 5 SIM. FLOOR/ROOF/CEILING TYPE KEY CONCRETE SLAB ON GRADE, SEE 28/A8.1A1 CONCRETE METAL DECK FLOOR AT LEVEL 02, SEE 29/A8.1A2 DRYWALL CEILING, SEE 30/A8.1B1 ACT CEILING, SEE 1/A8.2B2 PLYWOOD CEILING, SEE 2/A8.2B3 BUILDING A ROOF AT MPR, SEE 4/A8.2C1 BUILDING A ROOF W/ DRYWALL, SEE 5/A8.2C2 BUILDING B ROOF 01, SEE 6/A8.2C3 BUILDING B ROOF 02, SEE 7/A8.2C4 TILE SOFFIT, SEE 3/A8.2B4 BUILDING B ELEVATOR ROOF, SEE 8/A8.2C5 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:55:08 PM 2308 BUILDING SECTIONS BUILDING B MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A5.1.5 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"2CROSS SECTION AT LARGE OFFICE 1/4" = 1'-0"1CROSS SECTION AT IT ROOM 1/4" = 1'-0"4CROSS SECTION AT STAIRS 1/4" = 1'-0"3CROSS SECTION AT HUB 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT NOTES: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" V1V2V4V5 2 A5.1.7 IF-01 WORKSHOP 107 ELECTRICAL ROOM 109 SMALL OFFICE 213 UPPER HUB 201 STAFF RESTROOM 217 UPPER HUB 201 CLOSET 219 V3 MACHINE ROOM 112 A7.2 10 A7.6 8 OPP. A7.2 2 A7.3 12 A7.3 12 A7.6 9 A7.3 4 OPP. A7.5 2 A1 A2 B2 C4C3C4 B1 B1 B3 OPP.OPP.SIM. A7.4 7 OPP. A7.4 7 A2 B4 8' - 7 1/2" 8' - 4" 8' - 4" B1 7' - 6" V1V2V4V5 2 A5.1.7 SHARED OFFICE 218 BREAK ROOM 215 MEDIUM OFFICE 214 V3 MATERIAL STORAGE 108 A7.4 2 A7.2 9 OPP. A1 A2 B4 B1 C4 C3 C4 A7.2 3 OPP. SIM. A7.3 10 A7.3 10 SIM.SIM. 8' - 7 1/2" LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" U6 U1 2 A5.1.5 U5 U4 U3 U2 A7.6 1 A7.6 4 A7.3 7 MACHINE ROOM 112 LOWER HUB 106 UPPER HUB 201 CLOSET 219 SHARED OFFICE 218 MEDIUM OFFICE 202 LARGE OFFICE 203 LUNCH STORAGE 113 A7.2 7OPP. A7.4 2 A7.6 6 SIM. A7.6 6 SIM. A7.5 7 A7.3 5 A1 B1B4 A2 A2 B4 C4 B2 B1 B1 SIM. A7.2 11 SIM.COLUMN FOOTING BEYOND A1 A2 C4 C5 C4 FUR CEILING FLUSH FUR CEILING FLUSH 11' - 3" 9' - 6" FLOOR/ROOF/CEILING TYPE KEY CONCRETE SLAB ON GRADE, SEE 28/A8.1A1 CONCRETE METAL DECK FLOOR AT LEVEL 02, SEE 29/A8.1A2 DRYWALL CEILING, SEE 30/A8.1B1 ACT CEILING, SEE 1/A8.2B2 PLYWOOD CEILING, SEE 2/A8.2B3 BUILDING A ROOF AT MPR, SEE 4/A8.2C1 BUILDING A ROOF W/ DRYWALL, SEE 5/A8.2C2 BUILDING B ROOF 01, SEE 6/A8.2C3 BUILDING B ROOF 02, SEE 7/A8.2C4 TILE SOFFIT, SEE 3/A8.2B4 BUILDING B ELEVATOR ROOF, SEE 8/A8.2C5 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:55:25 PM 2308 BUILDING SECTIONS BUILDING B MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A5.1.6 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"2CROSS SECTION AT STAFF BATHROOM 1/4" = 1'-0"3CROSS SECTION AT KITCHEN 1/4" = 1'-0"1LONGITUDINAL SECTION AT MACHINE ROOM 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT NOTES: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" U6 U1 2 A5.1.5 U5 U4 U3 4 A5.1.5 3 A5.1.5 2 A5.1.6 3 A5.1.6 U2 A7.4 1 ADA FAMILY RESTROOM 104 TICKET BOOTH 105 LOWER HUB 106 WORKSHOP 107 BREAK ROOM 215 UPPER HUB 201 LARGE OFFICE 208 A7.2 7 A7.4 2 A7.5 8 A7.6 7 A7.6 11 A7.5 5 A7.6 7 OPP. A7.3 12 A7.2 8 A7.3 1 A1 A2 C3 B1 B1 B1 B1 B4 SIM. A2 9' - 4" MATERIAL STORAGE 108 STORAGE 115 8' - 7 1/2" LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" 1 A5.1.5 A7.4 1 A7.3 1 A7.4 12 CLOSET 204 CLOSET 205 IT ROOM 206 MEETING ROOM 207 UPPER HUB 201 STAFF RESTROOM 217 STORAGE 216 BREAK ROOM 215 WORKSHOP 107 LOWER HUB 106 RESTROOM 114 OPP. OPP. A7.2 8 OPP. A7.5 4 A7.5 5 OPP. A7.3 8 OPP. A7.4 8 A7.5 7 SIM. A7.2 7 SIM. A7.4 3 A1 B1 B1 B4 B1 C3 B1 B2 B1B1 B4 OPP. A7.4 5 OPP.OPP. A7.4 4 A7.3 5 SIM.COLUMN FOOTING BEYOND A2A2 A7.5 11 A7.5 12 OPP. FLOOR/ROOF/CEILING TYPE KEY CONCRETE SLAB ON GRADE, SEE 28/A8.1A1 CONCRETE METAL DECK FLOOR AT LEVEL 02, SEE 29/A8.1A2 DRYWALL CEILING, SEE 30/A8.1B1 ACT CEILING, SEE 1/A8.2B2 PLYWOOD CEILING, SEE 2/A8.2B3 BUILDING A ROOF AT MPR, SEE 4/A8.2C1 BUILDING A ROOF W/ DRYWALL, SEE 5/A8.2C2 BUILDING B ROOF 01, SEE 6/A8.2C3 BUILDING B ROOF 02, SEE 7/A8.2C4 TILE SOFFIT, SEE 3/A8.2B4 BUILDING B ELEVATOR ROOF, SEE 8/A8.2C5 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:55:41 PM 2308 BUILDING SECTIONS BUILDING B MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A5.1.7 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/4" = 1'-0"2LONGITUDINAL SECTION AT LEVEL 2 HUB 1/4" = 1'-0"1LONGITUDINAL SECTION AT KITCHEN 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT NOTES: 1. ALL EXPOSED DUCTS AND STRUCTURAL STEEL SHALL BE FINISHED PT-01 No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING A A WAP R2 S4 R1 A6.1 2 3 1 4 U-EM U U-EM U MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 U U-EM U U-EM MI.03 MI.03 MI.03 MI.09 MI.01 K3 MI.01 MULTIPURPOSE ROOM 101 TYP. 17' - 10"TYP. 4' - 3" 4' - 8" 17' - 10" TYP. 8' - 8" TYP. 11' - 10" TYP. 12' - 0" TYP. 11' - 10" 12' - 10" 13' - 1" 15' - 0" 11' - 1" 35' - 7 3/4" 29' - 4 1/2" 4' - 11 7/8" TYP. 7' - 6"TYP. 9' - 11"TYP. 9' - 11" 6' - 4" 10' - 0" 10' - 0" K3 MI.01 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:55:53 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.0.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date 1/2" = 1'-0"1BUILDING A LEVEL 1 ENLARGED REFLECTED CEILING PLAN - PHASE 1 -NORTH LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING A WAP R2 S3 R1 S2 MI.01 K3 U-EM U U-EM U U-EM U U-EM U MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 MI.09 K3 TYP. 17' - 10"TYP. 4' - 3" MI.01 TYP. 11' - 10" TYP. 9' - 8" TYP. 17' - 10" TYP. 4' - 8" TYP. 11' - 10" TYP. 6' - 4" TYP. 7' - 6"TYP. 9' - 11"TYP. 9' - 11" TYP. 10' - 0" TYP. 10' - 0" TYP. 5' - 9" 12' - 4" 18' - 9" 10' - 0" 17' - 8" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:56:04 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.0.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date 1/2" = 1'-0"1BUILDING A LEVEL 1 ENLARGED REFLECTED CEILING PLAN - PHASE 1- SOUTH LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" S3 IF-01IF-01 GL-01 U-EM U U U-EM U-EM U U U-EM MI.09 MI.03 MI.03 MI.03 MI.03MI.03 MI.09 MI.03 MI.10 4' - 0" PT-01 PT-01 MI.01 K3 11' - 10" 9' - 0"10' - 6" 9' - 0" 9' - 0" 11' - 10" LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" S3 IF-01IF-01 U U-EM U U-EM U-EM U U-EM U MI.09 MI.03 MI.03 MI.03 MI.03 MI.03 MI.03 K3 MI.10 K3 4' - 0" MI.01 MI.01 9' - 0"10' - 6" 9' - 0"10' - 6" 11' - 10" MI.01 MI.01 MI.01 IF-01 U U-EM U U-EM MI.03 MI.03 MI.03 MI.09 MI.10 4' - 0" K3 MI.01 K3 10' - 6" 11' - 10" 13' - 6" 9' - 0" U-EM U U-EM U MI.01MI.01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" IF-01 U U-EM U U-EM MI.03MI.03MI.03 MI.09 13' - 6" 11' - 10" U-EM U U-EM U 9' - 0"10' - 6" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:56:17 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 3/8" = 1'-0"2MPR 101 NORTH ELEVATION 3/8" = 1'-0"1MPR 101 SOUTH ELEVATION 3/8" = 1'-0"4MPR 101 WEST ELEVATION 3/8" = 1'-0"3MPR 101 EAST ELEVATION 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING V1 V2 Y1 U5 U4 A6.10 5 3 6 4 SMALL OFFICE 212 WINDOW WHERE OCCURS 1' - 3" 3' - 5" 7" 4' - 0" 9' - 10 3/4" 9' - 11 1/2" V1 V2 Y1 U5 U4 SMALL OFFICE 212 K K MI.01 WINDOW WHERE OCCURS 9' - 0" IF-01IF-01 WINDOW WHERE OCCURS MI.01 IF-01 LEVEL 02 12' -11 1/2" GL-03 IF-01 Y2 U5 R.08 R.11 R.01 A6.10 10 11 9 12 R.09 R.02 R.07 R.05 V3 3' - 6" 1' - 0" R.15 R.12 R.14 STAFF RESTROOM 217 2' - 6" 5' - 0" 4' - 8" 2' - 6" 1' - 5" 4' - 0" 2' - 6" 4' - 0" 1' - 6" 3' - 0" 7' - 7" ø 5' - 0" 1' - 11" Y2 U5 A A V3 2' - 8" EQ EQ S 1' - 11" 4' - 0" STAFF RESTROOM 217 9' - 0" R.11 3' - 0" R.02 1' - 4 1/2" TI-03 IF-01 LEVEL 02 12' -11 1/2" 3' - 0" R.07 R.08 R.09 R.01 1' - 0" 2' - 0" 3' - 0" TI-03 IF-01 ALIGN MIRROR TO SINK CL GL-04 S 1' - 6" 1' - 5" 6" 2' - 10" R.08 3' - 4" TI-03 4' - 0" IF-01 11 1/8" 11 3/4"2' - 5" 2' - 10" 1' - 11 7/8" 3' - 4" R.11 R.02 3' - 4" 3' - 6" TI-03 IF-01 8" 2' - 4" R.12 R.15 1' - 6" R.05 4' - 0" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:58:32 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.10 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"2TYP. SMALL OFFICE ENLARGED PLAN 1/2" = 1'-0"1SMALL OFFICE 212 ENLARGED REFLECTED CELING 1/2" = 1'-0"5TYP. SMALL OFFICE NORTH ELEVATION 1/2" = 1'-0"3TYP. SMALL OFFICE EAST ELEVATION 1/2" = 1'-0"6TYP. SMALL OFFICE SOUTH ELEVATION 1/2" = 1'-0"4TYP. SMALL OFFICE WEST ELEVATION 25 1/2" = 1'-0"7STAFF RESTROOM 217 ENLARGED PLAN 1/2" = 1'-0"8STAFF RESTROOM 217 ENLARGED REFLECTED CEILING PLAN 1/2" = 1'-0"9STAFF RR 217 ENLARGED PLAN EAST 1/2" = 1'-0"10STAFF RR 217 ENLARGED WEST PLAN 1/2" = 1'-0"11STAFF RR 217 ENLARGED PLAN NORTH 1/2" = 1'-0"12STAFF RR 217 ENLARGED PLAN SOUTH LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING NOTES: 1) CONTRACTOR TO PROVIDE BLOCKING AS REQUIRED AT ALL WALL MOUNTED EQUIPMENT AND FIXTURES. U6 V4 V5 SHARED OFFICE 218 2184 A6.11 6 2 5 3 218A 219A 9" 11' - 5" 1' - 7" 8" 4' - 6"7" 5' - 11" 10' - 0 1/8" 20' - 1" U6 V4 V5 A6.11 6 2 5 3 D D D D D D D D D SHARED OFFICE 218 3' - 6 1/2" 3' - 6 1/2" 1' - 5 3/4" 6' - 0 1/2" 6' - 0 1/2" 4' - 0" MI.01 MI.01 MI.01 LEVEL 02 12' -11 1/2" D D D 9' - 0" IF-01 MI.01 D D D 9' - 0" IF-01 GL-03 LEVEL 02 12' -11 1/2" IF-01 D D D 9' - 0" IF-01 D D D 9' - 0" MI.01 MI.01 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:58:45 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.11 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1/2" = 1'-0"1SHARED OFFICE 218 ENLARGED PLAN 1/2" = 1'-0"4SHARED OFFICE 218 ENLARGED RCP 1/2" = 1'-0"2SHARED OFFICE 218 NORTH ELEVATION 1/2" = 1'-0"5SHARED OFFICE 218 EAST ELEVATION 1/2" = 1'-0"3SHARED OFFICE 218 SOUTH ELEVATION 1/2" = 1'-0"6SHARED OFFICE 218 WEST ELEVATION LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING +42" +42" +42" WAP U6 V2 V4 Y2 A6.12 3 4 5 6 BREAK ROOM 215 FB-01 CT-01 V3 3' - 10" 2' - 3" 4' - 0" 2' - 10" 4' - 8" 1' - 1 5/8" 5' - 3 1/4" 3' - 8 3/4" 215A 2151 2"K.04 K.01 3' - 10" 22' - 5" 2' - 6" 4' - 0" U6 V2 V4 Y2 BREAK ROOM 215 A A A A A A K4 K4 S.01 V3 A-EM A-EM 2151 D-EM D-EM 1' - 10" 4' - 2" 5' - 7" 3' - 6" 5' - 11" 5' - 11" 5' - 1" 2' - 5" 5' - 11" 3' - 3" 6' - 8" 4' - 5" 2' - 2" 8' - 6" N N LEVEL 02 12' -11 1/2" IF-01 MW-01 TI-03 MW-01 IF-01 MW-01 K4 K4 K.01 V3 5 1/4"3' - 0" 2' - 3" 2' - 3" 2' - 3" 5 1/4"2' - 3"2' - 3" 5 1/8" 3' - 6" 1' - 6" 1' - 6" 3' - 6" 1' - 6" 3' - 0" 2 1/4" 2' - 6" 1' - 8" 2' - 10" LEVEL 02 12' -11 1/2" IF-01 GL-03 D-EM A8.11 5 IF-01MW-01IF-01 MW-01 FB-01 S.01 7' - 0" D-EM D-EM IF-01 S.01 K4 D-EM K.02 A8.11 7 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:14:20 AM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A6.12 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/2" = 1'-0"2BREAK ROOM 215 ENLARGED PLAN 1/2" = 1'-0"1BREAK ROOM 215 ENLARGED REFLECTED CIELING PLAN 1/2" = 1'-0"3BREAK ROOM 215 NORTH ELEVATION 1/2" = 1'-0"4BREAK ROOM 215 EAST ELEVATION 1/2" = 1'-0"5BREAK ROOM 215 SOUTH ELEVATION 1/2" = 1'-0"6BREAK ROOM 215 WEST ELEVATION 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING 6 3 A WAP V2 V4 X1 Y2 X2 X3 U5 U4 U3 A6.13.21 2 4 3 A6.9 1 2 3 4 MEETING ROOM 207 UPPER HUB 201 A6.10 10 11 9 12 V3 10" 4' - 1" 8 " 8 " 3' - 9" 5' - 4" +6" +6" +6" +6" 1' - 10" 6' - 8" 1' - 0" 4' - 1" A6.13.3 1 A6.13.3 2 IT ROOM 206 STAFF RESTROOM 217 7"10" EQ EQ 7"10" 4" A6.13.33 4 A6.13.3 5 6 PLYWOOD CORNER 02 PLYWOOD CORNER 01 V2 V4 Y2 X2 X3 U4 U3 MEETING ROOM 207 UPPER HUB 201 K K K K R Q P S.01 D-EM D D-EM D D-EM D D-EM D D-EM K4 K4 V3 D 6' - 0" 6' - 0" 6' - 0" 6' - 0" 1' - 0" 6' - 0" 6' - 0" 3' - 0" 3' - 0" 6' - 0" 1' - 0" Y 5' - 1" 3' - 2" 11' - 0" 11' - 0" 8' - 6" A-EM A PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:59:04 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.13.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"1HUB 201 ENLARGED PLAN 1/2" = 1'-0"2HUB 201 ENLARGED REFLECTED CIELING PLAN 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING IF-01 MW-01 MW-01 FB-01 MW-01 D-EM D K4 IF-01 DD-EM S.01 K4 A8.11 2 9' - 0" IF-01 LEVEL 02 12' -11 1/2" U5 U4 U3 7' - 0" IF-01GL-03GL-03 GL-03 GL-03 IF-01 GL-03 IF-01 GL-03 D-EMDD-EMDD-EMD S.01 9' - 0" LEVEL 02 12' -11 1/2" IF-01 IF-01 MW-01 IF-01IF-01 MW-01 GL-03GL-03GL-03 D D D-EM S.01 D-EM MW-01 IF-01IF-01 9' - 0" 9' - 0" LEVEL 02 12' -11 1/2" U5U4U3 IF-01GL-03 IF-01 IF-01 MW-01 IF-01 GL-03 7' - 0" D-EM Q D D D-EM D K4 FB-01 MW-01 MW-01 S.01 K4 S.01 D 9' - 0" A8.10 1 P P PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:59:17 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.13.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"2HUB 201 NORTH ELEVATION 1/2" = 1'-0"4HUB 201 EAST ELEVATION 1/2" = 1'-0"1HUB 201 SOUTH ELEVATION 1/2" = 1'-0"3HUB 201 WEST ELEVATION 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 02 12' -11 1/2" U5 U4 U3 MW-01MW-01 GL-04 MW-01 IF-01 GL-04GL-04 MI.10 D-EM QRP D-EM K4 K4 MW-01 FB-01 9' - 0" LEVEL 02 12' -11 1/2" U5U4U3 MW-01 GL-04MW-01 MW-01 MW-01 FB-01 IF-01 IF-01 9' - 0" MW-01 MW-01 MI.10 D PQR D K4 K4 MW-01 FB-01 IF-01 LEVEL 02 12' -11 1/2" MW-01 4' - 0" MW-01MW-01 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:59:24 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.13.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date 1/2" = 1'-0"1HUB 201 NORTH CORRIDOR ENLARGED ELEVATION LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT 1/2" = 1'-0"2HUB 201 SOUTH CORRIDOR ENLARGED ELEVATION 1/2" = 1'-0"3PLYWOOD CORNER 01 ENLARGED WEST ELEVATION 1/2" = 1'-0"4PLYWOOD CORNER 01 ENLARGED EAST ELEVATION 1/2" = 1'-0"5PLYWOOD CORNER 02 ENLARGED EAST ELEVATION 1/2" = 1'-0"6PLYWOOD CORNER 02 ENLARGED WEST ELEVATION EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING R2 U1V5 X1U2 2 A6.14 115B 115A LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" R2 3' - 0" WM-01 115A115B 3' - 2"3' - 2"3' - 2"3' - 2"3' - 2"3' - 2"3' - 2"3' - 2" 17 A8.6 17 A8.6 4 A8.9 10 A8.8 10 A8.8 16 A8.8 LEVEL 01 (SEE 1/A3.0.1) 0' -0" X1 WM-01 17 A8.6 17 A8.6 14 A8.8 9 A8.8 17 A8.8 11 A8.8 MCMASTER-CARR HEAVY-DUTY UNTHREADED BUMPER 9306K14, MOUNTED ON THE BACK OF THE GATE, TYP. MCMASTER-CARR HEAVY-DUTY UNTHREADED BUMPER 9306K14, MOUNTED ON THE BACK OF THE GATE, TYP. 9' - 4" 2" 8' - 0" 2" R2 U1 V4 X1 Y2 U2 V3 1' - 6 5/8" 3' - 9 1/4" 3' - 9 1/4"3' - 1 3/4" 3' - 1 3/4" 3' - 1 3/4" 3' - 1 3/4" 3' - 1 3/4"4" 1/2" DEPRESSION ON CONCRETE FOR GATE CASTER 1/2" DEPRESSION ON CONCRETE FOR GATE CASTER 16' - 6 5/8" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:59:36 PM 2308 ENLARGED GATE PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.14 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"1LOW GATE AT LEVEL 1 1/2" = 1'-0"2LOW GATE EAST VIEW 25 1/2" = 1'-0"3MAIN SECURITY GATE WEST VIEW 1/2" = 1'-0"4MAIN SECURITY GATE LEVEL 1 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING V4 V5 X2 U3 4 A6.15.1 2 A6.15.1 FF-01 3 A6.15.1 FF-01 FF-01 CONTRASTING STRIPE, MINIMUM 2 INCHES AND MAXIMUM 4 INCHES, NOT MORE THAN 1 INCH FROM THE NOSE OF THE STEP. STRIPE SHALL EXTEND FULL WIDTH OF THE STEP. FOR CONTRASTING STRIPE USE JOHNSONITE: VIRCN-XX-B2. FINISH CHARCOAL 20. CONTRASTING STRIP, TYP. CONTRASTING STRIP, TYP. CONTRASTING STRIP, TYP. R @ T @ 0' -6 3/4" 11 1' -0"10 STAIR 01A R @ T @ 0' -6 3/4" 12 1' -0"11 STAIR 01B 1' - 0" 1' - 0" 6' - 2 3/8" STAIR WIDTH 4' - 7 7/8" STAIR WIDTH 4' - 7 7/8" U3 FF-01 16 A8.6 11R @ 6 3/4" 6' - 2 3/8" A8.6 7 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" V4 V5 A8.6 4 A8.6 5 A8.6 9 U3 FF-01 16 A8.6 12R @ 6 3/4" 6' - 9 1/8" A8.6 7 V4 V5 X2 U3 4 A6.15.1 2 A6.15.1 3 A6.15.1 R @ T @ 0' -6 3/4" 11 1' -0"10 STAIR 01A 1' - 11" 1' - 11" FF-01 CONTRASTING STRIPE, MINIMUM 2 INCHES AND MAXIMUM 4 INCHES, NOT MORE THAN 1 INCH FROM THE NOSE OF THE STEP. STRIPE SHALL EXTEND FULL WIDTH OF THE STEP. FOR CONTRASTING STRIPE USE JOHNSONITE: VIRCN-XX-B2. FINISH CHARCOAL 20. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:59:51 PM 2308 ENLARGED STAIRCASE PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.15.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"1STAIR 01 AT LEVEL 02 1/2" = 1'-0"4SECTION 01 AT STAIR 01 1/2" = 1'-0"2CROSS SECTION AT STAIR 01 1/2" = 1'-0"3SECTION 02 AT STAIR 01 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date 3 PC01 CORRECTIONS 03/28/25 1/2" = 1'-0"5STAIR 01 AT LEVEL 01 3 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:00:08 PM 2308 ENLARGED STAIRCASE PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.15.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1STAIR 01 AXON A2STAIR 01 AXON B 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING V1 V2 Y1 Y2 3 A6.15.3 4 A6.15.3 V3 X4 R @ T @ 0' - 6 3 / 4 " 12 0' - 11 " 11 ST A I R 0 2 B R @ T @ 0' - 6 3 / 4 " 11 0' - 11 " 10 ST A I R 0 2 A CONTRASTING STRIPE, MINIMUM 2 INCHES AND MAXIMUM 4 INCHES, NOT MORE THAN 1 INCH FROM THE NOSE OF THE STEP. STRIPE SHALL EXTEND FULL WIDTH OF THE STEP. CONSTRASTING STRIPE, TYP. 6' - 2 3/8" 5' - 0" 4' - 0" 1' - 0" 1' - 0" 1' - 11" 1' - 11" DK-01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" Y1 Y2 15 A8.6 12R @ 6 3/4" 6' - 9 1/8" 11R @ 6 3/4" 6' - 2 3/8" CO-02 CO-02 A8.7 17 A8.7 14 DK-01 V V V V V V V V V V V V V LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" X4 A8.7 12 A8.7 12 OPP. DK-01 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:00:21 PM 2308 ENLARGED STAIRCASE PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.15.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1/2" = 1'-0"2BUILDING B STAIR 02 LEVEL 02 1/2" = 1'-0"3SECTION 1 AT STAIR 02 1/2" = 1'-0"4SECTION 2 AT STAIR 02 1STAIR 02 AXON LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date 3 PC01 CORRECTIONS 03/28/25 3 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING V4 V5 X3 U5 U4 CLEAR HOIST WAY 7' - 0" MACHINE ROOM 112 7' - 0" 2' - 0" ø 1' - 9" ø 1' - 9" SUBMERSIBLE POWER UNIT MICROPROCESSOR CONTROL CLEAR HOIST WAY 8' - 4" 4' - 0" 3' - 0" ELEVATOR SIGNAGE SEE 12/G0.5.2 V4 V5 X3 U5 U4 7' - 0" 2' - 0" ø 1' - 9" ø 1' - 9" CLEAR HOIST WAY 8' - 4" CLEAR HOIST WAY 7' - 0" ELEVATOR CAR 6' - 9" ELEVATOR CAR 5' - 5 1/2" ELEVATOR CAR DOOR 3' - 6" ELEVATOR SIGNAGE SEE 12/G0.5.2 4' - 0" 3' - 0" V5 WRB-03 WRB-03 U5U4 8' - 0" TO HOIST BEAM 12' - 5" 4' - 0" 2"CLEAR ABOVE HOIST BEAM HOIST BEAM PER STRUCTURAL ELEVATOR PER SPEC WRB-03 2" MIN. LEVEL 01 (SEE 1/A3.0.1) 0' -0" CLEAR OPENING 3' - 6" CLEAR OPENING 7' - 0" MIN. 6' - 0" VISIBLE SIGNAL TO COMPLY WITH 11B-407.2.2 48" MAX ELEVATOR CALL CONTROL TO COMPLY WITH 11B-407.2.1 LEVEL 02 12' -11 1/2" CLEAR OPENING 3' - 6" CLEAR OPENING 7' - 0" VISIBLE SIGNAL TO COMPLY WITH 11B-407.2.2 48" MAX. ELEVATOR CALL CONTROL TO COMPLY WITH 11B-407.2.1 MIN. 6' - 0" ELEVATOR CAR CONTROL TO COMPLY WITH CBC 11B-407.4.6 & 11B-407.4.7 CAR POSITION INDICATOR TO COMPLY WITH CBC 11B-407.4.8 EMERGENCY COMMUNICATION TO COMPLY WITH CBC 11B-407.4.9 SUPPORT RAIL TO COMPLY WITH CBC 11B-407.4.10 SUPPORT RAIL TO COMPLY WITH CBC 11B-407.4.10 6" MAX. 31" MIN. 33" MAX. 1 1/2" MIN. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:16:10 AM 2308 ENLARGED ELEVATOR PLANS/ SECTIONS/ ELEVATIONS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A6.16 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/2" = 1'-0"1ELEVATOR AT LEVEL 01 1/2" = 1'-0"2ELEVATOR AT LEVEL 02 1/2" = 1'-0"5ELEVATOR SHAFT SECTION E-W 1/2" = 1'-0"6ELEVATOR SHAFT SECTION N-S 1/2" = 1'-0"3ELEVATOR LEVEL 01 ELEVATION 1/2" = 1'-0"4ELEVATOR LEVEL 02 ELEVATION NOTES: 1. HOISTWAY LANDING DOORS TO BE POWER- OPERATED PER CBC 3002.4 2. THE HOISTWAY LANDING OPENINGS SHALL BE PROVIDED WITH POWER-OPERATED DOORS. 3.THE ELEVATOR DESIGNATED THE MEDICAL EMERGENCY ELEVATOR SHALL BE EQUIPPED WITH A KEY SWITCH TO RECALL THE ELEVATOR NONSTOP TO THE MAIN FLOOR. ELEVATORS IN COMPLIANCE WITH CBC 3003.2 SHALL BE ACCEPTABLE. 4. PROVIDE A KEY SWITCH TO RECALL THE ELEVATOR NONSTOP TO THE MAIN FLOOR. FOR THE PURPOSE OF THIS SECTION, ELEVATORS IN COMPLIANCE WITH CBC 3003.2 SHALL BE ACCEPTABLE. 5. CALL CONTROLS AND KEYPADS SHALL COMPLY WITH CBC 11B-407.2.1 AND 11B-309.4 6. AUDIBLE HALL SIGNAL TO BE PROVIDED COMPLYING WITH CBC 11B-407.2.2.3 7. ELEVATOR TO COMPLY WITH ALL REQUIREMENTS FROM CBC 11B-407 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA1/2" = 1'-0"7ELEVATOR CAR FRONT ELEVATION FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING 1/2" = 1'-0"8ELEVATOR CAR REAR/SIDE ELEVATION 6 12' - 0" 18' - 2" 6" 6' - 7 1/4" 4' - 10 3/4" EQ EQ 6' - 2 1/2" 1' - 6" 7' - 0" GL-05 GL-05 GL-05 GL-05 6" CONCRETE CURB 18' - 2" 6 A8.4 2 A8.4 9 A8.4 10 A8.4 6' - 0" 7 A8.4 1 A8.4 GL-05 GL-05 GL-05 12' - 0" 6" 6' - 7 1/4" 4' - 10 3/4" EQEQ 1' - 5 1/4"6' - 2 1/2" 18' - 2 1/2" 7' - 0" GL-01 6" CONCRETE CURB GL-01 GL-01 GL-01 6' - 0" 1 A8.3 3 A8.4 4 A8.4 11 A8.35 A8.4 20 A8.4 10' - 1" 9' - 7" 6" 4' - 5 1/2"3' - 2 1/2"1' - 6" 9' - 2" GL-01 6" CONCRETE CURB GL-01GL-01 7' - 0" 3' - 0" 14 A8.4 3 A8.4 1 A8.3 15 A8.4 20 A8.4 11 A8.3 7' - 0" 4' - 0"3' - 0" 7' - 0" GL-03 27 A8.3 30 A8.3 GL-03 29 A8.3 22 A8.3 17 A8.3 16 A8.3 26 A8.3 25 A8.3 7' - 0" 3' - 0"2' - 0" 5' - 0" GL-03 29 A8.3 30 A8.3 GL-03 16 A8.3 26 A8.3 22 A8.3 17 A8.3 27 A8.3 25 A8.3 7' - 0" 3' - 0"3' - 10" 6' - 10" GL-03 29 A8.3 30 A8.3 GL-03 16 A8.3 26 A8.3 22 A8.3 17 A8.3 27 A8.3 25 A8.3 10' - 1" 3' - 0" 1' - 0"EQ EQ 3' - 1" 7' - 0" 7' - 1" 3' - 0" 14' - 11 1/2" GL-02 GL-02 GL-02 GL-02 19 A8.3 18 A8.3 21 A8.3 28 A8.3 29 A8.3 30 A8.3 23 A8.3 25 A8.3 8' - 6" 1' - 5 7/8"3' - 0"EQEQ 7' - 0" 1' - 6" GL-03 GL-03 GL-03 GL-03 24 A8.3 30 A8.3 29 A8.3 28 A8.3 26 A8.3 16 A8.3 GL-03 GL-03 GL-03 GL-03 24 A8.3 26 A8.3 25 A8.3 SIM. EQ EQ EQ EQ GLASS TYPES GL-01 INSULATING GLASS UNIT 1" INSULATING GLASS UNIT, ¼" OUTBOARD LITE WITH LOW-E COATING (SOLARBAN 70) ON #2 SURFACE, INBOARD LITE TEMPERED GLASS (CLEAR). GL-02 GLAZING TEMPERED CLEAR SAFETY GLAZING GL-03 FROSTED GLASS TEMPERED CLEAR SAFETY GLAZING WITH THE PAVIA ACID ETCH FULL BY VITRO GL-04 FRAMELESS MIRROR 1/4", QUALITY Q2, CLEAR FLOAT GLASS WITH SILVER, COPPER, AND ORGANIC COATING; EDGES: UNIFORMLY GROUND AND POLISHED. APPLY MASTIC TO BACK OF MIRROR "PATS" SPACED 4 PATS/SQ. FT.; ADJUST MIRROR SO THAT IT IS PLUMB AND IN PLACE TO AVOID DISTORTION OF REFLECTING IMAGES. ALLOW 1/8" SPACE BETWEEN BACK OF MIRROR AND WALL SURFACE. APPLY ALUMINIUM J CHANNEL SGS JC-5/8 BLACK AT MIRROR TOP AND BOTTOM; SECURELY CLIP TO SUBSTRATE USING NON-CORROSIVE ANCHORS. AT DRYWALL BACK-UP, ANCHORS MUST BE SECURED TO STUDS OR STEEL WALLPLATE SPANNING FROM STUD TO STUD. GL-05 FIRE RATED GLAZING FIRE RATED GLAZING PER SECTION 08910 IN SPEC BOOK. GL-06 OVERHEAD DOOR FROSTED GLASS 1/2" INSULATING GLASS UNIT, FROSTED GLASS/SATIN ETCHED FINISH PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:00:46 PM 2308 STOREFRONT PLANS AND ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.17 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"1STOREFRONT TYPE A 1/2" = 1'-0"2STOREFRONT TYPE B 1/2" = 1'-0"3STOREFRONT TYPE C 25 STOREFRONT SCHEDULE NO. TYPE WIDTH HEIGHT MANUFACTURER MODEL GLASS. FINISH REMARKS S1011 A 18' - 2" 12' - 0" ALUFLAM AW50 GL-06 60 MINUTE FIRE RATED STOREFRONT AND 45 MINUTE FIRE RATED DOOR S1012 B 18' - 2 1/2" 12' - 0" ARCADIA AFG451T GL-01 S1061 C 9' - 2" 10' - 1" ARCADIA AFG451T GL-01 S1071 D 14' - 11 1/2" 9' - 0" CRL DR4SBS12P GL-03 S2021 G 5' - 0" 7' - 0" CRL DR4SBS12P GL-04 S2031 G 5' - 0" 7' - 0" CRL DR4SBS12P GL-04 S2071 H 16' - 0 1/2" 9' - 9" - DR4SBS12P GL-04 S2072 I 10' - 8 1/4" 9' - 9" CRL DR4SBS12P GL-04 S2073 H 16' - 0 1/2" 9' - 9" - DR4SBS12P GL-04 S2081 G 5' - 0" 7' - 0" CRL DR4SBS12P GL-04 S2091 E 7' - 0" 7' - 0" CRL DR4SBS12P GL-04 S2101 E 7' - 0" 7' - 0" CRL DR4SBS12P GL-04 S2111 E 7' - 0" 7' - 0" CRL DR4SBS12P GL-04 S2121 E 7' - 0" 7' - 0" CRL DR4SBS12P GL-04 S2131 E 7' - 0" 7' - 0" CRL DR4SBS12P GL-04 S2141 F 6' - 10" 7' - 0" CRL DR4SBS12P GL-04 S2181 E 7' - 0" 7' - 0" CRL DR4SBS12P GL-04 1/2" = 1'-0"5STOREFRONT TYPE E 1/2" = 1'-0"7STOREFRONT TYPE G 1/2" = 1'-0"6STOREFRONT TYPE F 1/2" = 1'-0"4STOREFRONT TYPE D 1/2" = 1'-0"9STOREFRONT TYPE I 1/2" = 1'-0"8STOREFRONT TYPE H FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING No.Description Date 4 FIRE MASTER PLAN SUBMITTAL 03 01/29/25 +42" +42"+42" +42" +42" S1 R1 S2 BREAK ROOM 102 H H EQ EQ 6' - 4 3/8" 4' - 1 5/8" K.07K.07K.05 K.06K.07 2' - 0" EQ EQ 9' - 0" K.01 IF-01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" IF-012' - 0"4' - 0" K.07 K.07 K.07 1' - 2" 2' - 5" 2' - 10" K.04 K.05 K.05 MW-05 1' - 6"2' - 6"3' - 0" K.01 IF-01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" K.01 IF-01 K.03 1' - 2" 5' - 3" K.06 K.06 4' - 0" 5' - 0" K.07 K.07 2' - 10" 3' - 6" 3' - 6" 1' - 6" MW-05 S1 R1 S2 A6.2 7 11 8 12 14' - 6 3/8" K.01 CT-02 BREAK ROOM 102 3' - 0"3' - 0"1' - 6" 102A 102B 2' - 0"4' - 1"1' - 10"7" K.03 14' - 6 3/8" 8' - 11 3/8" CT-02 K.04 2" 2' - 6" 4' - 0" R2 S1 S2 A6.2 6 10 5 9 FURNITURE STORAGE 103 103A PANEL PER ELECTRICAL MI.11 20' - 6 5/8" 8' - 11 3/8" SWITCHGEAR PER ELECTRICAL R2 S1 S2 HVAC PER MECHANICAL ROOF HATCH ABOVE 6' - 5" 6' - 5"2' - 6" H H H LEVEL 01 (SEE 1/A3.0.1) 0' -0" IF-01 H H H SWITCHGEAR PER ELECTRICAL IF-01 H SWITCHGEAR PER ELECTRICAL IF-01 H MI.11 LEVEL 01 (SEE 1/A3.0.1) 0' -0" IF-01 PANEL PER ELECTRICAL PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:12:13 AM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A6.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/2" = 1'-0"4BREAK ROOM 102 ENLARGED RCP 1/2" = 1'-0"11BREAK ROOM 102 NORTH ELEVATION 1/2" = 1'-0"7BREAK ROOM 102 EAST ELEVATION 1/2" = 1'-0"12BREAK ROOM 102 SOUTH ELEVATION 1/2" = 1'-0"8BREAK ROOM 102 WEST ELEVATION 1/2" = 1'-0"3BREAK ROOM 102 ENLARGED PLAN 25 1/2" = 1'-0"1FURNITURE STORAGE 103 ENLARGED PLAN 1/2" = 1'-0"2FURNITURE STORAGE 103 RCP 1/2" = 1'-0"5FURNITURE STORAGE 103 EAST ELEVATION 1/2" = 1'-0"10FURNITURE STORAGE 103 NORTH ELEVATION 1/2" = 1'-0"9FURNITURE STORAGE 103 SOUTH ELEVATION 1/2" = 1'-0"6FURNITURE STORAGE 103 WEST ELEVATION LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 NOTES: 1) ALL APPLIANCE CONTROLS TO COMPLY WITH 11B-309 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING 6 V4 X1 Y2 U3 A6.3 6 2 9 10 A6.3 5 1 RESTROOM 114 ø 5' - 0" 114A 114B 114C 114D 114F 37 R.07R.07R.07R.07 R.04 2' - 6" 4' - 0" R.08 R.08 4' - 0" 2' - 6" 1' - 1" 2' - 11"1' - 1" R.09R.09R.09R.09 R.05 V3 FLOOR DRAIN PER PLUMBING FLOOR DRAIN PER PLUMBING 5' - 6" 2' - 0 5/8" 3' - 2" 3' - 2" 3' - 2" 3' - 2" 3' - 3 3/4" 18' - 10" 7' - 3 1/2" TYP. STALL 2' - 9 1/4" R.14 R.14 R.09 2' - 10" 1' - 3" R.12 13' - 3" AMBULATORY STALL 5' - 6" R.12 EQ EQ R.15 R.12 R.15 R.15 R.12R.12 R.15 114E AMBULATORY STALL 3' - 0 3/4" R.02 R.09 R.15 R.02 R.14 R.12 R.15 R.09 R.05 11" 2' - 10" 2' - 10" 2' - 5" TI-02 IF-03 TI-02 GL-04 R.09 R.14 R.14 4' - 0" 2' - 4" R.12 R.15 R.09 1' - 6"8" 3' - 6" V4 X1 Y2 U3 RESTROOM 114 A A A A A A A A A T 3' - 6" 5' - 11"5' - 11"4' - 0" TYP. EQ TYP. EQ TYP. 4' - 6" V3 18' - 10" 7' - 3 1/2" R.14R.14R.14R.14 TYP. 1' - 6" 9' - 0" EQ EQ R.14 R.14 6" R.05 TI-02 LEVEL 01 (SEE 1/A3.0.1) 0' -0" IF-03 IF-03 IF-03 IF-03 TI-02 R.09R.09 R.09 R.09 R.15R.15R.15R.15 R.14 R.14 R.14 R.14 R.02 IF-03 R.09 R.15 R.02 R.09R.14 R.15 R.14 IF-03 TYP. 1' - 5" R.09 R.09 R.09 R.09 IF-03 IF-03 IF-03 IF-03 IF-03 TYP. 4' - 0" TI-02 R.12 R.12R.02 4' - 0" R.15 R.12 R.15 R.15 R.12 R.15 R.12 R.14R.14R.14R.14 TYP. STALL 1' - 4 5/8" 2' - 11 1/4" TI-02 R.15 R.09 R.14 R.02 2' - 11 1/4" TYP. 1' - 5" TYP. AMBULATORY STALL 1' - 6 3/8" R.09 R.14 R.15 R.12 LEVEL 01 (SEE 1/A3.0.1) 0' -0" Y2 R.08 11" 5" 2' - 5" 2' - 10" 1' - 11 1/2" TYP. 1' - 5"TI-02 CO-02IF-03 11 1/4" TYP. 5' - 6" R.04 R.07 R.07 R.07R.07 2' - 10" 6" R.08 R.08 3' - 4" 3' - 4" 3' - 0" 10' - 0" 3' - 0" 2' - 4" 10 5/8" 2' - 5" CO-02 GL-04 LEVEL 01 (SEE 1/A3.0.1) 0' -0" IF-03 TI-02 8" 3' - 6" 1' - 0" 3' - 0" 1' - 6"2' - 4" R.12 R.15 R.02 R.09 3' - 6" IF-03 TI-02 3' - 0" 4' - 0" 1' - 5" 1' - 0" 3' - 6" R.02 R.14 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:12:20 AM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A6.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/2" = 1'-0"4PUBLIC RESTROOM 114 ENLARGED PLAN 1/2" = 1'-0"10PUBLIC RESTROOM 114 NORTH ELEVATION 01 1/2" = 1'-0"11PUBLIC BATHROOM 114 ENLARGED REFLECTED CEILING PLAN 1/2" = 1'-0"6PUBLIC RESTROOM 114 EAST ELEVATION 01 1/2" = 1'-0"1PUBLIC RESTROOM 114 WEST ELEVATION 02 1/2" = 1'-0"5PUBLIC RESTROOM 114 EAST ELEVATION 02 1/2" = 1'-0"2PUBLIC RESTROOM 114 SOUTH ELEVATION 01 1/2" = 1'-0"9PUBLIC RESTROOM 114 WEST ELEVATION 01 1/2" = 1'-0"3PUBLIC RR 114 AMBULATORY ACCESSIBLE STALL N. ELEVATION 1/2" = 1'-0"7PUBLIC RR 114 AMBULATORY ACCESSIBLE STALL S. ELEVATION 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date 4 FIRE MASTER PLAN SUBMITTAL 03 01/29/25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING NOTES: 1) CONTRACTOR TO PROVIDE BLOCKING AS REQUIRED AT ALL WALL MOUNTED EQUIPMENT AND FIXTURES. V2 Y1 X1 U3 A6.4 1 5 2 4 ADA FAMILY RESTROOM 104 2' - 6" 4' - 0" 3' - 0"3' - 0" 3' - 0" R.10 R.14 R.09 R.08 R.07 R.01 R.03 3' - 6" R.06 104A 2' - 10 1/4" 6' - 3 3/8" 1' - 0"2' - 0" 1' - 0" 13' - 10" 4' - 0" 2' - 0" 10" 3' - 6" 6' - 1 5/8" FLOOR DRAIN PER PLUMBING 4' - 8" 5' - 0" R.14 9' - 11 3/8" 3' - 2" 6" 4 ' - 5 " R.15 R.12 R.01 ø 5' - 0" R.09 R.03 3' - 0" 1' - 6" 1' - 0" 3' - 6" R.01 7 1/4" 4' - 5 1/4" TI-02 8" 4' - 6" 1' - 6" R.15 R.12 LEVEL 01 (SEE 1/A3.0.1) 0' -0" R.03 R.14 J BOX LOCATION R.10 4' - 0" 40" MIN 7 1/4" 4' - 5 1/4" EQEQ R.14 2 3/4" 4' - 6 7/8" CO-02 2' - 10" 2' - 5" 11 3/4" 1' - 11 1/2" R.03 R.08 CO-02 LEVEL 01 (SEE 1/A3.0.1) 0' -0" R.07 R.08 R.09 2' - 10" 3' - 0" 2' - 6" 1' - 5" 1' - 6" 1' - 0"2' - 0" 3' - 0" R.01 6" 3' - 0" 3' - 4" 2' - 5"3' - 4" R.06 TI-02 GL-04 V2 Y1 X1 U3 ADA FAMILY RESTROOM 104 A A 7' - 10"3' - 0" 13' - 10" S 2' - 6" 3' - 0" 2' - 6" 5' - 0" A A 8' - 6" 1' - 3" 1' - 3" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:57:06 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.4 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"3ADA FAMILY RESTROOM 104 ENLARGED PLAN 1/2" = 1'-0"5ADA FAMILY RESTROOM 104 NORTH ELEVATION 1/2" = 1'-0"2ADA FAMILY RESTROOM 104 EAST ELEVATION 1/2" = 1'-0"4ADA FAMILY RESTROOM 104 SOUTH ELEVATION 1/2" = 1'-0"1ADA FAMILY RESTROOM 104 WEST ELEVATION 1/2" = 1'-0"6ADA FAMILY RESTROOM 104 ENLARGED REFECTED CEILING PLAN 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING NOTES: 1) CONTRACTOR TO PROVIDE BLOCKING AS REQUIRED AT ALL WALL MOUNTED EQUIPMENT AND FIXTURES. WAP V2 V4 V5 Y1 Y2 X2 X3 U4 LOWER HUB 106 A6.5 1 2 A6.5 5 A6.5 12 FB-01 V3 106A 107A 106B MI.10 MI.10 5' - 0" 6' - 11 1/2" 8' - 8" 5' - 8 1/2" S1061 +42"+6" +6" 1 ' - 0 " 8" 3' - 3" 5 ' - 5 " 7' - 0" 9 ' - 3 " MI.07 MI.07 A6.5 8 V2 V4 V5 Y1 Y2 X2 X3 U4 LOWER HUB 106 A-EM B B B B B B B A-EM S.01 A-EM A-EM A-EM A S.01 V3 11" 1' - 5" 4' - 0" 3' - 9" 6 ' - 0 " 2' - 7" 3' - 4 7/8" 8' - 3" 3 ' - 0 " 3 ' - 0 " 3' - 0" 3' - 0" 3' - 0" 4' - 4" 2' - 1" 5' - 0" 4 ' - 1 0 " 5' - 0" 11' - 0 7/8" 9' - 2" A-EMEQ EQ 1' - 0" K4 K3 10' - 1" N N N S.01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" X2 X3 IF-01 IF-01 IF-01 MW-01 S.01 MI.10 4' - 0" K3 IF-01 IF-01 MI.10 S.01 MW-01 K3 LEVEL 01 (SEE 1/A3.0.1) 0' -0" Y2 IF-01 MW-01 IF-01 IF-01GL-02 FB-01 S.01 IF-01 GL-02 BLACK OUTLET ON PLYWOOD, TYP. 4 A8.11 GL-02 S.01 K4 MW-01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" Y2 IF-01 MW-01 MW-01 GL-02 IF-01 IF-01 IF-01 MW-01 CO-02 FF-01 MI.10 S.01 MW-01 4' - 0" BLACK OUTLET ON PLYWOOD, TYP. A8.11 1 A8.10 3 LEVEL 01 (SEE 1/A3.0.1) 0' -0" X2 GL-01 GL-01 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:57:21 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.5 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"6LOWER HUB 106 ENLARGED PLAN 1/2" = 1'-0"7LOWER HUB 106 ENLARGED REFLECTED CEILING PLAN 1/2" = 1'-0"5HUB 106 WEST ELEVATION 01 1/2" = 1'-0"4HUB 106 WEST ELEVATION 02 25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT 1/2" = 1'-0"1HUB 106 NORTH ELEVATION 01 1/2" = 1'-0"2HUB 106 SOUTH ELEVATION 01 No.Description Date 1/2" = 1'-0"8HUB 106 EAST ELEVATION 01 +4 2 " +4 2 " AA WAP AA V1 V2 Y1 Y2 X3 U5U4 A6.6 2 1 54 WORKSHOP 107 107A 107B V3 5' - 6" 8' - 6" 3' - 6" 3' - 0" 1' - 8" 2' - 2" 1' - 11" 4' - 3" 4' - 4" 6' - 7" 8" MI.08 107C 9' - 0"5' - 0" 7' - 0" 6' - 6" CT-03 S1 0 7 1 MI.13 MI.14 21' - 11" CT-03 8 A8.11 6 A8.11 24' - 11 5/8" 19' - 11" 2' - 0" +4 2 " 2' - 6" 4' - 0" V1 V2 Y1 Y2 X3 U5U4 WORKSHOP 107 F F F FFF V3 K3 107B DUCTS PER MECHANICAL 4' - 6 1/4"7' - 11 1/2"7' - 11 1/2" 8' - 11" 5' - 0" PT-01 PT-01 PT-01 PT-01 IF-01 MW-01 PT-01 CT-03 MI.13 MI.14 1' - 6" 3' - 6" 2' - 6" 2' - 6" 2" 3' - 4" 1" 5' - 0" CT-03 MW-01 WASHER AND DRYER BEYOND CABINET2" 2' - 8" CT-03 1 GANG RING & STRING TO ABOVE AV DATA AV POWER SCREEN BY OWNER 6' - 8" 3' - 6" F F LEVEL 01 (SEE 1/A3.0.1) 0' -0" IF-01 IF-01 PT-01 PT-01 Y2 IF-01 IF-01 IF-01 GL-02GL-02 PT-01 PT-01 GL-02 LEVEL 01 (SEE 1/A3.0.1) 0' -0" X3 IF-01 CO-02 MW-02 K3 PT-01 A8.10 8 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:13:00 AM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A6.6 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/2" = 1'-0"3WORKSHOP 107 ENLARGED PLAN 1/2" = 1'-0"6WORKSHOP 107 ENLARGED REFLECTED CEILING PLAN 1/2" = 1'-0"5WORKSHOP 107 NORTH ELEVATION 1/2" = 1'-0"2WORKSHOP 107 EAST ELEVATION 1/2" = 1'-0"4WORKSHOP 107 SOUTH ELEVATION 1/2" = 1'-0"1WORKSHOP 107 WEST ELEVATION 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date 6 PC SUBMITTAL 03 04/28/25 EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING 6 +4 2 " +4 2 " AA U6 V1 V2 Y1 Y2 A6.7 2 5 4 1 MATERIAL STORAGE 108 6' - 5" 5' - 0" 2 ' - 9 " 6 ' - 6 " 5' - 6" 2' - 10" 2' - 10" 108A 108B X4 19' - 11" 15' - 9 5/8" STORAGE 115 U6 V1 V2 Y1 Y2 MATERIAL STORAGE 108 H H H EQ 7' - 9 5/8" EQ EQ 8' - 11" EQ H X4 DUCTS PER MECHANICAL PT-01 PT-01 PT-01 PT-01 108B PT-01 CO-02 H H PT-01 PT-01 8' - 6" LEVEL 01 (SEE 1/A3.0.1) 0' -0" H H IF-01 DUCTS PER MECHANICAL PT-01 LEVEL 01 (SEE 1/A3.0.1) 0' -0" IF-01 H H PT-01 PT-01 CO-02 PT-01 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:57:48 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.7 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"3MATERIAL STORAGE 108 ENLARGED PLAN 1/2" = 1'-0"6MATERIAL STORAGE 108 ENLARGED REFLECTED CELING PLAN 1/2" = 1'-0"5MATERIAL STORAGE 108 NORTH ELEVATION 1/2" = 1'-0"2MATERIAL STORAGE 108 EAST ELEVATION 1/2" = 1'-0"1MATERIAL STORAGE 108 SOUTH ELEVATION 1/2" = 1'-0"4MATERIAL STORAGE 108 WEST ELEVATION 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING AA U1 V4 V5 Y2 2 A4.1.0 A6.8 6 3 4 5 LARGE OFFICE 203 U2 WINDOW WHERE OCCURS WINDOW WHERE OCCURS 6" 5' - 9" 7" 7" 3' - 2" 11' - 11 1/2" 3' - 4" 2' - 3" 2' - 0" 17' - 11 3/4" U1 V4 V5 Y2 LARGE OFFICE 203 D D D D D D D D D U2 MI.01 MI.01 6' - 0" 6' - 0" 3' - 0" 3' - 9" 3' - 9" 2' - 3" WINDOW WHERE OCCURS WINDOW WHERE OCCURS V4 D D D IF-01 GL-03 9' - 0" 11' - 6" LEVEL 02 12' -11 1/2" U2 DDD IF-01 9' - 0" 11' - 3" V4 MI.01 D D D 9' - 0" 16AWG STEEL BACKING 6"X36" OR SPAN 3 STUDS MIN.DATA AV POWER 1 GANG RING & STRING TO ABOVE AV 1' - 4" 4' - 6" 1' - 3" 5' - 0" WINDOW WHERE OCCURS LEVEL 02 12' -11 1/2" U2 D D D MI.01 9' - 0" WINDOW WHERE OCCURS PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:58:01 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.8 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"1TYP. LARGE OFFICE ENLARGED PLAN 1/2" = 1'-0"2TYP. LARGE OFFICE REFLECTED CEILING PLAN 1/2" = 1'-0"6TYP. LARGE OFFICE NORTH ELEVATION 1/2" = 1'-0"4TYP. LARGE OFFICE EAST ELEVATION 1/2" = 1'-0"5TYP. LARGE OFFICE SOUTH ELEVATION 1/2" = 1'-0"3TYP. LARGE OFFICE WEST ELEVATION IF-01 IF-01 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING AA A V1 V2 Y1 X1 U3 A6.9 5 7 8 6 MEDIUM OFFICE 209 5' - 8" 1' - 0" 5' - 2" 7" WINDOW WHERE OCCURS 7"7" 2' - 4" 12' - 9 3/8" 9' - 10 3/4" V1 V2 Y1 X1 U3 MEDIUM OFFICE 209 K K K K WINDOW WHERE OCCURS MI.01 9' - 0" IF-01 LEVEL 02 12' -11 1/2" IF-01 16AWG STEEL BACKING 6"X36" OR SPAN 3 STUDS MIN.DATA AV POWER 1 GANG RING & STRING TO ABOVE AV 5' - 0" 1' - 3" 1' - 4" 4' - 6" MI.01 WINDOW WHERE OCCURS IF-01 IF-01GL-03 Y2 X2 U3 A6.9 1 2 3 4 MEETING ROOM 207 V3 EQ EQ 15' - 11 1/2" 10' - 7 1/2" 1' - 2" 3' - 9" 8 " 8 " 10" Y2 X2 U3 MEETING ROOM 207K K K K V3 8' - 6" Y 5' - 1" LEVEL 02 12' -11 1/2" GL-03GL-03 MONITOR BY OTHERS 16AWG STEEL BACKING 6"X48" OR SPAN 3 STUDS MIN. IF-01 DATA AV POWER 5' - 10" 1' - 0" 7' - 1" TO FLOOR BOX GL-03 Y PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 5:58:16 PM 2308 ENLARGED PLANS/ SECTIONS/ ELEVATIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A6.9 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1/2" = 1'-0"11TYP. MEDIUM OFFICE ENLARGED PLAN 1/2" = 1'-0"12TYP. MEDIUM OFFICE ENLARGED REFLECTED CEILING PLAN 1/2" = 1'-0"7TYP. MEDIUM OFFICE NORTH ELEVATION 1/2" = 1'-0"5TYP. MEDIUM OFFICE EAST ELEVATION 1/2" = 1'-0"8TYP. MEDIUM OFFICE SOUTH ELEVATION 1/2" = 1'-0"6TYP. MEDIUM OFFICE WEST ELEVATION 1/2" = 1'-0"9MEETING ROOM 207 ENLARGED PLAN 1/2" = 1'-0"10MEETING ROOM 207 ENLARGED CEILING PLAN 1/2" = 1'-0"1MEETING ROOM 207 EAST ELEVATION 1/2" = 1'-0"2MEETING ROOM 207 NORTH ELEVATION 1/2" = 1'-0"4MEETING ROOM 207 SOUTH ELEVATION 1/2" = 1'-0"3MEETING ROOM 207 WEST ELEVATION 25 LIGHTING FIXTURE KEY A RECESSED DOWNLIGHT A-EM RECESSED DOWNLIGHT B RECESSED WALL WASH C RECESSED DOWNLIGHT D PENDANT LIGHT D-EM PENDANT LIGHT F SUSPENDED PENDANT H 48" DIFFUSE PLASTIC LENS H-EM 48" DIFFUSE PLASTIC LENS K ACT 2X2 K3 WALL MOUNTED EXIT SIGN K4 CEILING MOUNTED EXIT SIGN N EXTERIOR SCONCE P DECORATIVE PENDANT Q DECORATIVE PENDANT R DECORATIVE PENDANT S RECESSED LINEAR SLOT T RECESSED LINEAR SLOT U SUSPENDED RING U-EM SUSPENDED RING V EXTERIOR STEP LIGHTS Y 18W SLAB 150 - PENDANT No.Description Date EQUIPMENT KEY BREAK ROOM K.01 MICROWAVE K.02 FOOD WASTE DISPOSER K.03 ICE MAKER K.04 COUNTER DEPTH REFRIGERATOR K.05 STEEL WALL SHELVES K.06 STEEL WALL SHELVES K.07 STEEL WALL SHELVES MISCELLANEOUS MI.01 LOW VOLTAGE SHADES MI.03 PENDANT SPEAKER MI.04 EXTERIOR LOUVER 1.8 SF MI.05 LOUVER MI.06 EXTERIOR LOUVER 1.8 SF MI.07 WALK OFF MAT MI.08 WALK OFF MAT MI.09 PROJECTOR MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET MI.11 ROOF ACCESS HATCH LADDER MI.12 ROOF TIE-BACK ANCHOR MI.13 LG WASHER MI.14 LG DRYER MI.15 COPY MACHINE MI.16 DRINKING FOUNTAIN GRAB BAR RESTROOM R.01 GRAB BAR 36" R.02 GRAB BAR 46" R.03 ADULT CHANGING TABLE R.04 BABY CHANGING STATION R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER R.06 RECESSED FREE NAPKIN DISPENSER R.07 ELECTRONIC SOAP DISPENSER R.08 WALL MOUNTED HAND DRYER R.09 TOILET SEAT CLEANER DISPENSER R.10 FOLDING UTILITY SHELF R.11 BABY CHANGING STATION RECESSED R.12 SANITARY NAPKIN DISPOSAL R.14 BAG HOOK R.15 TOILET PAPER DISPENSER SECURITY S.01 SECURITY CAMERA FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING LEVEL 02 12' -11 1/2" ROOF ASSEMBLY AND FINISH TYPE C1 PER PLANS A8.5 21 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS BLOCKING PER STRUCTURAL BEAM PER STRUCTURAL A8.5 17 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" R1 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C1 PER PLANS BEAM PER STRUCTURAL A8.5 3 A8.5 18 A8.5 16 SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS CONCRETE PAVERS PER LANDSCAPE WALL ASSEMBLY AND FINISH TYPE 3 PER PLANS 6" LEVEL 01 (SEE 1/A3.0.1) 0' -0" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS BEAM PER STRUCTURAL ROOF ASSEMBLY AND FINISH TYPE C2 PER PLANS A8.5 4 A8.5 4 WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS LEVEL 02 12' -11 1/2" ROOF ASSEMBLY AND FINISH TYPE C1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS BEAM PER STRUCTURAL A8.6 14 WALL ASSEMBLY AND FINISH TYPE 4D PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" S4 A8.3 12 SIM. FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS STOREFRONT PER SCHEDULE HEADER PER STRUCTURAL PLANTING PER LANDSCAPE A8.4 3 A8.5 21 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C1 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" S2 BEAM PER STRUCTURAL SLAB ON GRADE AND FOOTING PER STRUCTURAL FLOOR FINISH TYPE A1 PER PLANS IF-01 WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C1 PER PLANS CEILING FINISH TYPE B1 PER PLANS CEILING WHERE OCCURS A8.5 4 A8.6 14 A8.5 4 LEVEL 01 (SEE 1/A3.0.1) 0' -0" R2 ROOF ASSEMBLY AND FINISH TYPE C1 PER PLANS BEAM PER STRUCTURAL A8.5 20 A8.5 22 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CONCRETE PER LANDSCAPE WALL ASSEMBLY AND FINISH TYPE 3 PER PLANS A8.5 3 A8.5 18 WALL ASSEMBLY AND FINISH TYPE 3 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS PLANTING PER LANDSCAPE CEILING WHERE OCCURS BEAM PER STRUCTURAL CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS A8.5 3 A8.5 21 SIM. WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C5 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" R2 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CONCRETE PER LANDSCAPE WALL ASSEMBLY AND FINISH TYPE 3 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C1 PER PLANS A8.5 3 A8.5 18 A8.5 22 LEVEL 01 (SEE 1/A3.0.1) 0' -0" S4 ROOF ASSEMBLY AND FINISH TYPE C1 PER PLANS BEAM PER STRUCTURAL FLOOR FINISH TYPE A1 PER PLANS PLANTING PER LANDSCAPE WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS SLAB ON GRADE AND FOOTING PER STRUCTURAL A8.5 3A8.5 19 A8.5 21 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:00:56 PM 2308 BLDG A WALL SECTIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A7.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1" = 1'-0"4SECTION AT MPR OVERHANG 1" = 1'-0"3SECTION AT TYP. SOUTH TILE WALL AT BLDG A 1" = 1'-0"5 INT. WALL B/W WARMING KITCHEN & FURNITURE STORAGE 1" = 1'-0"8SOFFIT WALL AT MPR 1" = 1'-0"6SECTION AT MPR WEST WALL 1" = 1'-0"9INT. WALL B/W WARMING KITCHEN & MPR 1" = 1'-0"2SECTION AT EXTERIOR TILE NICHE 1" = 1'-0"7SECTION AT TYP. EAST WALL AT BLDG A 25 1" = 1'-0"1SECTION AT TYP. NORTH TILE WALL AT BLDG A 1" = 1'-0"10MPR EXTERIOR WALL FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING No.Description Date LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" Y1 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CONCRETE PAVERS PER LANDSCAPE CO-02 BEAM PER STRUCTURAL A8.5 11 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS A8.7 8 A8.5 25 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS PLANTING PER LANDSCAPE BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS A8.5 4 A8.5 19 A8.5 25 A8.5 11 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS SLAB ON GRADE PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS IF-01 CEILING ASSEMBLY AND FINISH FINISH TYPE B1 PER PLANS BEAM PER STRUCTURAL WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS A8.5 10 CEILING IF OCCURS PER PLANS A8.5 4 A8.5 19 A8.5 25 A8.6 13 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS SLAB ON GRADE PER STRUCTURAL WINDOW PER SCHEDULE HEADER PER STRUCTURAL CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS BEAM PER STRUCTURAL STRINGER PER STRUCTURAL A8.5 19 A8.6 5 A8.4 11 A8.4 12 A8.5 25 A8.6 13 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS SHADE PER SCHEDULE LEVEL 02 12' -11 1/2" WINDOW WHERE OCCURS HEADER PER STRUCTURAL ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS CONCRETE DECK PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS A8.5 4A8.7 2 A8.4 26 A8.4 27 A8.5 25 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS SHADE PER SCHEDULE LEVEL 02 12' -11 1/2" T.O. ROOF 30' -8 1/2" U1 SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 3 PER PLANS BEAM PER STRUCTURAL A8.5 11 A8.6 3 A8.5 24 LEVEL 02 12' -11 1/2" SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS BEAM PER STRUCTURAL FLOOR FINISH TYPE A2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS WINDOW WHERE OCCURS HEADER PER STRUCTURAL ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS A8.5 17 A8.4 26 A8.4 27 A8.5 25 A8.5 11 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS LEVEL 02 12' -11 1/2" U6 ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS BLOCKING PER STRUCTURAL BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS A8.5 25 A8.5 17 A8.5 10 LEVEL 02 12' -11 1/2" A8.5 11 A8.5 17 A8.4 26 A8.4 27 A8.6 19 A8.5 25 IF-01 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS WINDOW WHERE OCCURS CEILING ASSEMBLY AND FINISH TYPE B2 PER PLANS SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS BEAM PER STRUCTURAL HEADER PER STRUCTURAL 6" OPP. SHADE PER SCHEDULE WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS LEVEL 02 12' -11 1/2" BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS IF-01 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.5 10A8.7 2 A8.5 25 6" LEVEL 02 12' -11 1/2" SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 3 PER PLANS A8.6 3 A8.6 28 A8.6 27 WALL ASSEMBLY AND FINISH TYPE 3 PER PLANS PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:01:07 PM 2308 WALL SECTIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A7.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1" = 1'-0"3SECTION AT PARAPET & MEDIUM OFFICE 1" = 1'-0"2MACHINE ROOM EXTERIOR WALL 1" = 1'-0"5SECTION AT HUB 01 WEST WALL 1" = 1'-0"4SECTION AT STAIRCASE WALL 1" = 1'-0"1SECTION AT MEDIUM OFFICE 1" = 1'-0"7SECTION AT LARGE OFFICE 1" = 1'-0"9TYP. SECTION AT LARGE OFFICE WOOD WALL 1" = 1'-0"11WOOD WRAP WALL SECTION 1" = 1'-0"10SECTION AT OFFICE WALL 1" = 1'-0"8SECTION AT BREAK ROOM EXTERIOR 1" = 1'-0"6TYP. PARAPET WALL AT TERRACE FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING No.Description Date LEVEL 02 12' -11 1/2" A8.3 26 A8.3 27 A8.6 19 CEILING ASSEMBLY AND FINISH TYPE B2 PER PLANS INTERIOR GLAZING PER SCHEDULE ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS 6" WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS BEAM PER STRUCTURAL CEILING WHERE OCCURS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS OFFICECORRIDOR ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS CEILING WHERE OCCURS PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS DOOR PER SCHEDULE FLOOR ASSEMBLY AND FINISH TYPE 2A PER PLANS STOREFRONT PER SCHEDULE CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS CONCRETE PER LANDSCAPE A8.3 11 A8.3 1 A8.4 14 SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS LEVEL 02 12' -11 1/2" A8.6 19 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS 6" A8.5 10 A8.5 11 CEILING WHERE OCCURS ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS LEVEL 02 12' -11 1/2" CEILING ASSEMBLY AND FINISH TYPE B2 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANSFLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS GL-02 A8.3 26 A8.3 24 A8.6 1 WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS SLAB ON GRADE PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING WHERE OCCURS PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS A8.5 4 A8.5 4 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY PER PLANS CEILING ASSEMBLY AND FINISH TYPE B2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B2 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS 6"6" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.5 11 A8.5 11 A8.6 19 A8.6 19 WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" HEADER PER STRUCTURAL DOOR PER SCHEDULE SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CONCRETE PER LANDSCAPE WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS A8.3 10 A8.4 25 A8.6 12 A8.6 18 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" Y1 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CO-02 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS DOOR PER SCHEDULE BEAM PER STRUCTURAL SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS FOOTING PER STRUCTURAL CONCRETE PAVERS PER LANDSCAPE A8.5 11 A8.4 13 A8.5 17 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS A8.6 10 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" Y2 CONCRETE PER LANDSCAPE FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FOOTING PER STRUCTURAL DOOR PER SCHEDULE CO-02 CO-02SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.6 10 THRESHOLD #1675A ZERO INTERNATIONAL LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" Y1 FOOTING PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CONCRETE PAVERS PER LANDSCAPE CO-02 CO-02 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.7 7 A8.7 1 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FOOTING PER STRUCTURAL CO-02 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CO-02 A8.7 1 2% STAIRCASE PER PLANS BEAM PER STRUCTURAL LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CONCRETE DECK PER STRUCTURAL CEILING ASSEMBLY AND FINISH TYPE B2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS A8.5 11 A8.5 11 A8.6 19 6" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:01:18 PM 2308 WALL SECTIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A7.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1" = 1'-0"11SECTION AT TYP. OFFICE CURTAIN WALL 1" = 1'-0"6SECTION AT ENTRANCE DOOR 106A 1" = 1'-0"10SECTION AT TYP. OFFICE 1" = 1'-0"8SECTION AT MEETING ROOM GLASS PARTITION 25 1" = 1'-0"12SECTION AT TYP. PARTITION 1" = 1'-0"9SECTION AT TYP. OFFICE PARTITION 1" = 1'-0"5SECTION AT ELECTRICAL ROOM 1" = 1'-0"4SECTION AT GARAGE DOOR 1" = 1'-0"3SECTION AT MATERIAL STORAGE DOOR 1" = 1'-0"2SECTION AT MATERIAL STORAGE 1" = 1'-0"1SECTION AT STAIRS & MATERIAL STORAGE 1" = 1'-0"7SECTION AT MEDIUM & SMALL OFFICE FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING No.Description Date LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B3 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS ROOF ASSEMBLY PER PLANS A8.5 5 A8.5 12 CEILING WHERE OCCURS PER PLANS WALL ASSEMBLY AND FINISH TYPE 5 PER PLANS A8.5 7 WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" CO-02 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS PLANTING PER LANDSCAPE CO-02 FOOTING PER STRUCTURAL STAIR PER PLANS A8.7 12 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS BASE FINISH PER PLANS BASE FINISH PER PLANS A8.5 13 A8.5 13 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.5 5 A8.5 13 A8.5 8 WALL ASSEMBLY AND FINISH TYPE 5 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CO-02 CO-02 CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS BEAM PER STRUCTURALBEAM PER STRUCTURAL CO-02 CO-02 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CONCRETE PAVERS PER LANDSCAPE A8.6 10 A8.6 11 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 5 PER PLANS A8.5 7 A8.5 14 A8.5 5 A8.6 1 BEAM PER STRUCTURAL CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS CO-02 SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS CONCRETE PAVERS PER LANDSCAPE FOOTING PER STRUCTURAL CEILING WHEN OCCURS PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.5 9 A8.6 11 A8.6 10 LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CO-02 CO-02 SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS A8.6 10 A8.6 11 CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.5 8 A8.5 5 A8.5 5 A8.5 7 WALL ASSEMBLY AND FINISH TYPE 5 PER PLANS WALL ASSEMBLY AND FINISH TYPE 5 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS LEVEL 02 12' -11 1/2" BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS A8.5 5 A8.5 14 A8.6 1 A8.5 8 WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.5 4 A8.5 13 CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR FINISH PER PLANS BEAM PER STRUCTURAL WALL ASSEMBLY AND FINISH TYPE 5 PER PLANS CEILING FINISH PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS A8.5 5 A8.5 4 A8.5 7 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:01:28 PM 2308 WALL SECTIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A7.4 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1" = 1'-0"7SECTION AT UPPER HUB & RESTROOM 25 1" = 1'-0"1SECTION AT CONCRETE STAIRCASE WALL 1" = 1'-0"12SECTION AT TYP. RESTROOM PARTITION 1" = 1'-0"11SECTION AT RESTROOM INT. WALL 1" = 1'-0"3SECTION AT RESTROOM EXTERIOR WALL 1" = 1'-0"9SECTION AT RESTROOM & TICKET BOOTH 1" = 1'-0"2SECTION AT ADA RESTROOM 1" = 1'-0"6CEILING DETAIL AT RESTROOM 1" = 1'-0"10SECTION AT RESTROOM FURRED WALL 1" = 1'-0"5SECTION AT UPPER HUB & STAFF WASHROOM 1" = 1'-0"8SECTION AT LOWER HUB & RESTROOM 1" = 1'-0"4SECTION AT STORAGE & STAFF RESTROOM FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING No.Description Date LEVEL 02 12' -11 1/2" BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS IF-01 WALL ASSEMBLY AND FINISH TYPE 7 PER PLAN CEILING ASSEMBLY AND FINISH TYPE B3 PER PLAN FLOOR ASSEMBLY AND FINISH TYPE C3 PER PLANS A8.5 12 A8.5 10 A8.6 1 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANSLEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FB-01 MW-01 GL-02 A8.11 4 A8.3 18 A8.3 19 A8.6 18 A8.5 4 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS A8.5 12 CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.6 1 SIM. FB-01 MW-01 WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLAN FLOOR ASSEMBLY AND FINISH TYPE C3 PER PLANS A8.5 12 A8.6 6 LEVEL 02 12' -11 1/2" SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS A8.5 11 A8.5 11 ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS LEVEL 02 12' -11 1/2" BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE C4 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE C3 PER PLANS A8.5 11 A8.5 10 LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.5 10 A8.5 11 CO-02 CEILING ASSEMBLY AND FINISH TYPE B2 PER PLANS WALLASSEMBLY AND FINISH TYPE 6 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS 6" A8.6 19 ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS GL-02 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CONCRETE DECK PER STRUCTURAL A8.3 27 A8.3 26 BEAM PER STRUCTURAL LEVEL 02 12' -11 1/2" SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS A8.5 11 BEAM PER STRUCTURAL A8.5 15 LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.5 10 A8.5 12 A8.6 1 CEILING WHERE OCCURS WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS LEVEL 02 12' -11 1/2" ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS A8.5 12 A8.5 15 A8.6 1 LEVEL 02 12' -11 1/2" SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS A8.5 11 A8.5 15 ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS LEVEL 02 12' -11 1/2" 6" ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B2 PER PLAN BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS A8.5 10 A8.5 15 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:01:39 PM 2308 WALL SECTIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A7.5 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1" = 1'-0"3SECTION AT UPPER HUB & STORAGE 1" = 1'-0"5SECTION AT PLYWOOD BENCH 1" = 1'-0"4SECTION AT STORAGE & BREAK ROOM 25 1" = 1'-0"7SECTION AT LARGE OFFICE & CLOSET 1" = 1'-0"2SECTION AT UPPER HUB & CLOSET 1" = 1'-0"6SECTION AT UPPER HUB & MEDIUM OFFICE 1" = 1'-0"8SECTION AT LARGE OFFICE INT. 1" = 1'-0"9SECTION BETWEEN IT ROOM & LARGE OFFICE 1" = 1'-0"1SECTION AT STORAGE 1" = 1'-0"10IT ROOM SECTION FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING No.Description Date 1" = 1'-0"11SECTION AT IT ROOM & CLOSET 1" = 1'-0"12SECTION AT MTG ROOM & IT ROOM LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" U3 FLOOR FINISH PER PLANS SLAB ON GRADE PER STRUCTURAL FLOOR FINISH PER PLANS STAIRCASE LANDING PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS BLOCKING PER STRUCTURAL A8.5 4 A8.6 5 A8.6 19 A8.5 11 A8.6 13 6" WALL ASSEMBLY AND FINISH TYPE 6 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4A PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS SLAB ON GRADE PER STRUCTURAL STAIRCASE PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS BEAM PER STRUCTURAL CO-02 WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS A8.6 4 A8.10 6 MILLWORK PER PLANS LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS ROOF ASSEMBLY TYPE C4 PER PLANS HOIST BEAM PER STRUCTURAL A8.5 10 BEAM PER STRUCTURAL LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" CONCRETE PER LANDSCAPE CO-02 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS CO-02 SOFFIT ASSEMBLY AND FINISH TYPE B4 PER PLANS BEAM PER STRUCTURAL FOOTING PER STRUCTURAL A8.6 10 CEILING WHERE OCCURS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS A8.6 11 LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" X3 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS GL-02 A8.3 17 A8.6 18 FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE 1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS A8.5 5 A8.5 4 A8.5 8 IF-01 CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 5 PER PLANS LEVEL 02 12' -11 1/2" CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS BEAM PER STRUCTURAL FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS A8.6 9 A8.5 10 SIM. CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE 3 PER PLANS A8.6 1 A8.6 2 WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B3 PER PLANS LEVEL 02 12' -11 1/2" Y2 FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B3 PER PLANS CEILING ASSEMBLY AND FINISH TYPE B1 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS A8.6 2 A8.6 1 WALL ASSEMBLY AND FINISH TYPE 7 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C3 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLAN LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" FLOOR ASSEMBLY AND FINISH TYPE A1 PER PLANS FLOOR ASSEMBLY AND FINISH TYPE A2 PER PLANS ROOF ASSEMBLY AND FINISH TYPE C5 PER PLANS BEAM PER STRUCTURAL HOIST BEAM PER STRUCTURAL A8.5 4 OPP. A8.5 26 ROOF ASSEMBLY AND FINISH TYPE C4 PER PLANS WALL ASSEMBLY AND FINISH TYPE 4 PER PLANS LEVEL 01 (SEE 1/A3.0.1) 0' -0" LEVEL 02 12' -11 1/2" ROOF ASSEMBLY AND FINISH TYPE C5 PER PLANS PLANTING PER LANDSCAPE HOIST BEAM PER STRUCTURAL A8.5 19 A8.5 23 WALL ASSEMBLY AND FINISH TYPE 2 PER PLANS PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:01:50 PM 2308 WALL SECTIONS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A7.6 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1" = 1'-0"4SECTION AT STAIRCASE & MEDIUM OFFICE 1" = 1'-0"3SECTION AT STAIRS INT. WALL 1" = 1'-0"13SECTION AT ELEVATOR SHAFT 1" = 1'-0"2SECTION AT CONC.WALL & TILE SOFFIT 1" = 1'-0"12INTERIOR WALL TO CONCRETE METAL DECK 1" = 1'-0"11DECK AT LEVEL 02 1" = 1'-0"1SECTION AT STAIRCASE WALL BUILDING B 1" = 1'-0"10SOFFIT WALL AT UPPER HUB 1" = 1'-0"9TYP. FRAMED SOFFIT 1" = 1'-0"8SECTION AT UPPER HUB MECH WALL 1" = 1'-0"7SECTION AT UPPER HUB MECH. WALL 1" = 1'-0"6SECTION AT ELEVATOR INTERIOR WALL 1" = 1'-0"5SECTION AT ELEVATOR EXTERIOR WALL FINISH KEY ACT-01 ACOUSTICAL TILE CEILING BF-01 COVE BASE BF-02 TOELESS BASE BF-03 COVE BASE BF-04 STAINLESS STEEL BASE CO-01 CONCRETE FLOOR CO-02 CONCRETE WALL CO-03 CONCRETE FLOOR CP-01 CARPET TILE CT-01 QUARTZ COUNTER TOP CT-02 STAINLESS STEEL COUNTER CT-03 BUTCHER BLOCK DK-01 DECK FB-01 CUSHION FABRIC FB-02 FABRIC FC-01 POLYSORB CEILING PANEL FF-01 LVT GL-01 EXTERIOR GLAZING GL-02 INTERIOR GLAZING GL-03 INTERIOR PRIVACY GLASS GL-04 FRAMELESS MIRROR GL-05 FIRE RATED GLAZING GLB-01 EXPOSED STRUCTURAL FRAMING IF-01 INTERIOR DRYWALL FINISH IF-02 EXPOSED CEILING IF-03 GREEN DRYWALL MT-01 BLACK METAL MW-01 MILLWORK MW-02 WHITE CABINETRY MW-03 MILLWORK MW-04 MILLWORK MW-05 GRAY CABINETRY PL-01 FIRE RATED PLYWOOD PT-01 PAINT FINISH PT-02 PAINT FINISH PT-03 PAINT FINISH RF-01 PVC ROOFING TI-01 EXTERIOR TILE TI-02 INTERIOR TILE TI-03 INTERIOR TILE WD-01 EXTERIOR WOOD FINISH WD-02 WOOD DECK BOARDS WM-01 WIRE MESH WRB-01 SELF ADHERED VAPOR BARRIER WRB-02 LIQUID APPLIED WATERPROOFING WRB-03 ELEVATOR WATERPROOFING WRB-04 CONCRETE PLANTER WATERPROOFING No.Description Date WALL ASSEMBLY WALL TYPE 1A: EXTERIOR CONCRETE WALL PER CBC TABLE 722.2.1.1 CAST IN PLACE OR PRECAST WALLS, ALL CONCRETE WALL TYPES ABOVE 5" THICK ARE MORE THAN 2 HOURS FIRE RATED. LAYER 1: CIP CONCRETE 6" BOARD FORMED NOTES: 1. FINISH PER PLANS 8" WALL ASSEMBLY WALL TYPE 1B: EXTERIOR CONCRETE WALL PER CBC TABLE 722.2.1.1 CAST IN PLACE OR PRECAST WALLS, ALL CONCRETE WALL TYPES ABOVE 5" THICK ARE MORE THAN 2 HOURS FIRE RATED. LAYER 1: CIP CONCRETE 12" BOARD FORMED NOTES: 1. FINISH PER PLANS 1' - 0" WALL ASSEMBLY WALL TYPE 3B: EXTERIOR TILE WALL TCNA W244E 1 HOUR FIRE RATED PER UL DES U329 R-VALUE: 22 LAYER 1: TI-01 WITH GROUT JOINTS LAYER 2: 1/4" CEMENTITIOUS BOND COAT LAYER 3: WRB-02 LAYER 3: 1/2" USG DUROCK CEMENT BACKERBOARD LAYER 5: WRB-01 LAYER 6: PLYWOOD PER STRUCTURAL LAYER 7: FRAMING PER STRUCTURAL LAYER 8: R-22 MINERAL WOOL INSULATION LAYER 9: 5/8" USG SHEETROCK FIRECODE TYPE "X" GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 11 5/8" WALL ASSEMBLY WALL TYPE 4A: INTERIOR PARTITION 1 HOUR FIRE RATED PER UL U305 LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: FRAMING PER STRUCTURAL LAYER 3: MINERAL WOOL INSULATION LAYER 4: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 4 3/4" WALL ASSEMBLY WALL TYPE 4B: INTERIOR FURRED PARTITION LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: FRAMING PER STRUCTURAL LAYER 3: MINERAL WOOL INSULATION NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 4 1/8" WALL ASSEMBLY WALL TYPE 5A: INTERIOR TILE PARTITION TCNA W244 LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: FRAMING PER STRUCTURAL LAYER 3: MINERAL WOOL INSULATION LAYER 4: 1/2" CEMENT BACKER BOARD LAYER 5: THINSET MORTAR LAYER 6: TILE PER PLANS WITH GROUT JOINTS NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 5 1/2" 5 1/4" PARTITION ASSEMBLY WALL TYPE 6A: INTERIOR PARTITION WITH RESILIENT CHANNEL 1 HOUR FIRE RATED PER UL U305 LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: FRAMING PER STRUCTURAL LAYER 3: MINERAL WOOL INSULATION LAYER 4: RC-1 RESILIENT CHANNEL @ 24" OC. LAYER 5: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 5 3/8" WALL ASSEMBLY WALL TYPE 7A: INTERIOR PARTITION WITH PLYWOOD 1 HOUR FIRE RATED PER UL U305 LAYER 1: MW-01 LAYER 2: CLEATS LAYER 3: FRAMING PER STRUCTURAL LAYER 4: MINERAL WOOL INSULATION LAYER 5: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 6 1/8" WALL ASSEMBLY WALL TYPE 7B: INTERIOR PARTITION WITH PLYWOOD LAYER 1: MW-01 LAYER 2:CLEATS LAYER 3: MINERAL WOOL INSULATION LAYER 4: FRAMING PER STRUCTURAL LAYER 5: 1/2" CEMENT BACKER BOARD LAYER 4: THIN SET MORTAR LAYER 5: TILE PER PLANS WITH GROUT JOINTS NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL WALL ASSEMBLY WALL TYPE 7C: INTERIOR PARTITION WITH PLYWOOD LAYER 1: MW-01 LAYER 2: CLEATS LAYER 2: FRAMING PER STRUCTURAL LAYER 4: MINERAL WOOL INSULATION NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 4 3/4" WALL ASSEMBLY WALL TYPE 8: INTERIOR GLASS PARTITION LAYER 1: GLAZING PER PLANS CHANNEL TOP AND BOTTOM NOTES: EQ EQ WALL ASSEMBLY WALL TYPE 7D: INTERIOR PARTITION WITH PLYWOOD LAYER 1: MW-01 LAYER 2:CLEATS LAYER 3:FRAMING PER STRUCTURAL LAYER 4: MINERAL WOOL INSULATION NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 6 3/4" WALL ASSEMBLY WALL TYPE 5B: INTERIOR TILE PARTITION TCNA W244 LAYER 1: FRAMING PER STRUCTURAL LAYER 2: MINERAL WOOL INSULATION LAYER 3: 1/2" CEMENT BACKER BOARD LAYER 4: THIN SET MORTAR LAYER 5: TILE PER PLANS WITH GROUT JOINTS NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 6 7/8" WALL ASSEMBLY WALL TYPE 7E: INTERIOR PARTITION WITH PLYWOOD LAYER 1: MW-01 LAYER 2: CLEATS LAYER 3: FRAMING PER STRUCTURAL LAYER 5: MINERAL WOOL INSULATION LAYER 6: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 7 3/8" WALL ASSEMBLY WALL TYPE 7F: INTERIOR PARTITION WITH PLYWOOD LAYER 1: MW-01 LAYER 2: CLEATS LAYER 3: PLYWOOD PER STRUCTURAL LAYER 4: FRAMING PER STRUCTURAL LAYER 5: MINERAL WOOL INSULATION LAYER 6: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 7 7/8" WALL ASSEMBLY WALL TYPE 2B: EXTERIOR WOOD SIDING WALL 1 HOUR FIRE RATED PER UL U305 R-VALUE: 22 LAYER 1: WD-01 LAYER 2: GRAD MINI RAIL SYSTEM @ 24"O.C. MAX LAYER 3: VAPROSHIM ATTACHED TO FRAMING PER SPACING LAYER 4: WRB-01 LAYER 5: 5/8" DENSGLASS SHEATHING LAYER 6: PLYWOOD PER STRUCTURAL LAYER 7: R-22 MINERAL WOOL INSULATION LAYER 8: FRAMING PER STRUCTURAL LAYER 9: 3/4" FURRING LAYER 10: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 11 1/4" WALL ASSEMBLY WALL TYPE 3C: EXTERIOR TILE WALL TCNA W244E R-VALUE: 22 LAYER 1: TI-01 WITH GROUT JOINTS LAYER 2: 1/4" CEMENTITIOUS BOND COAT LAYER 3: WRB-02 LAYER 3: 1/2" CEMENT BACKERBOARD LAYER 4: WRB-01 LAYER 5: PLYWOOD PER STRUCTURAL LAYER 6: FRAMING PER STRUCTURAL LAYER 7: R-22 MINERAL WOOL INSULATION LAYER 8: PLYWOOD PER STRUCTURAL LAYER 9: WRB-01 LAYER 10: 1/2" CEMENT BACKERBOARD LAYER 11: WRB-02 LAYER 12: 1/4" CEMENTITIOUS BOND COAT LAYER 13: TI-01 WITH GROUT JOINTS NOTES: 1. FINISH PER PLANS 9"7 3/4" PARTITION ASSEMBLY WALL TYPE 6B: INTERIOR PARTITION WITH RESILIENT CHANNEL LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: RC-1 RESILIENT CHANNEL @ 24" OC. LAYER 3: FRAMING PER STRUCTURAL LAYER 4: MINERAL WOOL INSULATION LAYER 5: PLYWOOD PER STRUCTURAL LAYER 6: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL WALL ASSEMBLY WALL TYPE 4C: INTERIOR FURRED PARTITION LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: PLYWOOD PER STRUCTURAL LAYER 3: FRAMING PER STRUCTURAL LAYER 4: MINERAL WOOL INSULATION NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 6 5/8" 6 1/8" WALL ASSEMBLY WALL TYPE 4D: INTERIOR FURRED PARTITION LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: FRAMING PER STRUCTURAL LAYER 3: MINERAL WOOL INSULATION NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 6 3/4" WALL ASSEMBLY WALL TYPE 4E: INTERIOR PARTITION 1 HOUR FIRE RATED PER UL U305 LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: FRAMING PER STRUCTURAL LAYER 3: MINERAL WOOL INSULATION LAYER 4: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 7 1/4" WALL ASSEMBLY WALL TYPE 4F: INTERIOR PARTITION 1 HOUR FIRE RATED PER UL U305 LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: PLYWOOD PER STRUCTURAL LAYER 3: FRAMING PER STRUCTURAL LAYER 4: MINERAL WOOL INSULATION LAYER 5: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL PARTITION ASSEMBLY WALL TYPE 6C: INTERIOR PARTITION WITH RESILIENT CHANNEL LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: FRAMING PER STRUCTURAL LAYER 3: MINERAL WOOL INSULATION LAYER 4: RC-1 RESILIENT CHANNEL @ 24" OC. LAYER 5: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 7 1/4" WALL ASSEMBLY WALL TYPE 2A: EXTERIOR WOOD SIDING WALL R-VALUE: 22 LAYER 1: WD-01 LAYER 2: GRAD MINI RAIL SYSTEM @ 24"O.C. MAX LAYER 3: VAPROSHIM ATTACHED TO EVERY FRAMING MEMBER LAYER 4: WRB-01 LAYER 5: 5/8" DENSGLASS SHEATHING LAYER 6: PLYWOOD PER STRUCTURAL LAYER 7: R-22 MINERAL WOOL INSULATION LAYER 8: FRAMING PER STRUCTURAL LAYER 9: 5/8" TYPE 'X' GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 8 3/4" WALL ASSEMBLY WALL TYPE 3A: EXTERIOR TILE WALL TCNA W244E 1 HOUR FIRE RATED PER UL DES U329 R-VALUE: 22 LAYER 1: TI-01 WITH GROUT JOINTS LAYER 2: 1/4" CEMENTITIOUS BOND COAT LAYER 3: WRB-02 LAYER 3: 1/2" USG DUROCK CEMENT BACKERBOARD LAYER 5: WRB-01 LAYER 6: PLYWOOD PER STRUCTURAL LAYER 7: FRAMING PER STRUCTURAL LAYER 8: R-22 MINERAL WOOL INSULATION LAYER 9: 5/8" USG SHEETROCK FIRECODE TYPE "X" GWB NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 7 7/8" WALL ASSEMBLY WALL TYPE 7G: INTERIOR PARTITION WITH PLYWOOD LAYER 1: MW-01 LAYER 2: CLEATS LAYER 3: 1" FURRING LAYER 4: FRAMING PER STRUCTURAL LAYER 5: PLYWOOD PER STRUCTURAL LAYER 6: MINERAL WOOL INSULATION LAYER 7: MW-01 NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 9" WALL ASSEMBLY WALL TYPE 7H: INTERIOR PARTITION WITH PLYWOOD LAYER 1: MW-01 LAYER 2: CLEATS LAYER 3: 1" FURRING LAYER 4: FRAMING PER STRUCTURAL LAYER 5: MINERAL WOOL INSULATION NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 7 3/4" WALL ASSEMBLY WALL TYPE 7I: INTERIOR PARTITION WITH PLYWOOD LAYER 1: MW-01 LAYER 2:CLEATS LAYER 3: MINERAL WOOL INSULATION LAYER 4: FRAMING PER STRUCTURAL LAYER 5: CLEATS LAYER 6" MW-01 NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 8" PARTITION ASSEMBLY WALL TYPE 6D: INTERIOR PARTITION WITH FIRE RATED PLYWOOD LAYER 1: 5/8" TYPE 'X' GWB LAYER 2: FRAMING PER STRUCTURAL LAYER 3: MINERAL WOOL INSULATION LAYER 4: FIRE RATED PLYWOOD NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 6 5/8" WALL ASSEMBLY WALL TYPE 7J: INTERIOR PARTITION WITH FIRE RATED PLYWOOD LAYER 1: MW-01 LAYER 2: CLEATS LAYER 3: FRAMING PER STRUCTURAL LAYER 5: MINERAL WOOL INSULATION LAYER 6: FIRE RATED PLYWOOD NOTES: 1. FINISH PER PLANS 2. ADD ACOUSTICAL SEAL 7 1/4" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:17:27 AM 2308 TYPICAL ASSEMBLIES MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A8.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 3" = 1'-0"1WALL TYPE 1A (2 HOUR) 3" = 1'-0"2WALL TYPE 1B (2 HOUR) 3" = 1'-0"6WALL TYPE 3B (1 HOUR) 3" = 1'-0"8WALL TYPE 4A (1 HOUR) 3" = 1'-0"9WALL TYPE 4B 3" = 1'-0"14WALL TYPE 5A 3" = 1'-0"16WALL TYPE 6A (1 HOUR) 3" = 1'-0"20WALL TYPE 7A (1 HOUR) 3" = 1'-0"21WALL TYPE 7B 3" = 1'-0"22WALL TYPE 7C 3" = 1'-0"30WALL TYPE 8 3" = 1'-0"23WALL TYPE 7D 3" = 1'-0"15WALL TYPE 5B 3" = 1'-0"24WALL TYPE 7E 3" = 1'-0"25WALL TYPE 7F 3" = 1'-0"4WALL TYPE 2B (1 HOUR) 3" = 1'-0"7WALL TYPE 3C 3" = 1'-0"17WALL TYPE 6B 3" = 1'-0"10WALL TYPE 4C 3" = 1'-0"11WALL TYPE 4D 3" = 1'-0"12WALL TYPE 4E (1 HOUR) 25 3" = 1'-0"13WALL TYPE 4F (1 HOUR) 3" = 1'-0"18WALL TYPE 6C 3" = 1'-0"3WALL TYPE 2A 3" = 1'-0"5WALL TYPE 3A (1 HOUR) 3" = 1'-0"26WALL TYPE 7G 3" = 1'-0"27WALL TYPE 7H 3" = 1'-0"28WALL TYPE 7I 3" = 1'-0"19WALL TYPE 6D No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 3" = 1'-0"29WALL TYPE 7J (1 HOUR) 6 6 6 6 6 6 6 6 6 6 6 LEVEL 02 12' -11 1/2" MW-03 2 LAYERS, TYP. MW-03 MW-03 MW-03 MW-03 1 LAYER, TYP. 2 LAYERS FB-01 2 A8.10 6 A8.10 7 A8.10 1 LAYER, TYP. MW-03 6' - 1 1/8" 4" 1 1/2" 1' - 0 1/2" 3/4" 1' - 6 1/4" 3/4" 1' - 6 1/4" 4" 3' - 6" 10' - 10 7/8" EQ EQ EQ EQ EQ EQ 1' - 6" MW-03MW-03 2 LAYERS, TYP. MW-03 1 LAYER FB-01 1' - 6" 4" 1' - 2" 11 1/4" 2" 10' - 10 7/8" EQ EQ EQ EQ EQ EQ CONCRETE DECK PER STRUCTURAL MW-01 CLEATS INSULATION PER PLANS MW-03 MW-03 ONE LAYER, TYP ONE LAYER, TYP MW-03 MW-03 FLOOR FINISH PER PLANS 2x4 WOOD STUD 3/4" 1' - 6 1/4" 3/4" 1' - 6 1/4" 4" 10 1/2" 2" 1' - 9 1/4" CLEATS 1" FURRING PROVIDE BACKING AS NECESSARY FOR CLEATS MW-03 ONE LAYER, TYP IF-01 MW-03 MW-03 FLOOR FINISH PER PLANS CONCRETE DECK PER STRUCTURAL 2x4 WOOD STUD 2 LAYERS FB-01 1' - 0 1/2" 1 1/2" 4" 4" CLEATS 1' - 5" MW-01 INSULATION PER PLANS CLEATS 1' - 6" 1' - 1" PROVIDE BACKING AS NECESSARY FOR CLEATS LEVEL 01 (SEE 1/A3.0.1) 0' -0" 4' - 9 1/2" TYP. 6 3/4" 4 A8.10 MW-03 MW-03 2 LAYERS 1 LAYER TYP. MW-03 1 LAYER TYP. 5 A8.10 EQEQEQEQ 1' - 9" 1' - 2" 1 1/2" 1' - 10 1/2" 4' - 9 1/2" 6" IF-01 IF-01 MW-03 1 LAYER TYP. MW-03 CLEATS 2" 4' - 9 1/2" 1' - 4 3/8" 3/4" 3/4" 3/4" 1' - 3 1/4" 2" 3/4" 6" 3/4" 6" 3/4" 6" 3/4" 1' - 2" 1 1/2" 1' - 10 1/2" 3"ATTACHMENT TO BRACKET PER MILLWORK CONTRACTOR MW-03 MW-03 1 LAYER TYP. MW-03 1 LAYER TYP. IF-01 FLOOR FINISH PER PLANS STUD SUPPORTED BRACKET 1' - 6" 1' - 9" CLEATS PROVIDE BACKING AS NECESSARY FOR CLEATS LEVEL 01 (SEE 1/A3.0.1) 0' -0" 9 A8.10 2' - 6" 5' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 2' - 6" 12' - 6" 8' - 0" 3 1/2" BERENSON BRAVO BLACK EDGE PULL 1064-4055-P, TYP. AT ALL CABINETS 3 1/2" 2' - 6 5/8" 5' - 5 3/8" 8' - 0" TYP. 1" MW-03 MW-03 ONE LAYER, TYP. ONE LAYER, TYP. IF-01 COUNTERSUNK SCREW COUNTERSUNK SCREW COUNTERSUNK SCREW 2x4 BLOCKING IF-01 CEILING PER PLANS 3" MW-02 ONE LAYER, TYP. MW-03 LAMINATE 1' - 9" 2' - 0" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:03:09 PM 2308 MILLWORK DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.10 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1" = 1'-0"1ELEVATION AT BENCH ON LEVEL 02 1" = 1'-0"2PLAN AT BENCH ON LEVEL 02 3" = 1'-0"6SECTION AT STORAGE ON LEVEL 02 3" = 1'-0"7SECTION AT BENCH ON LEVEL 02 1" = 1'-0"3MAILBOX ELEVATION ON LEVEL 01 1" = 1'-0"4MAILBOX PLAN ON LEVEL 01 3" = 1'-0"5MAILBOX SECTION ON LEVEL 01 1" = 1'-0"8CABINETS IN WORKSHOP ELEVATION 1 1/2" = 1'-0"9SECTION AT CABINETS IN WORKSHOP No.Description Date LEVEL 01 (SEE 1/A3.0.1) 0' -0" Y2 1 A8.12 2 A8.12 3 A8.12NUMBERS CARVED OUT OF PLYWOOD, 1/4" DEEP, TYP. STRAIGHT HASP, TYP. BERENSON BRAVO BLACK EDGE PULL 1060-4055-P, TYP. AT ALL LOCKERS BERENSON BRAVO BLACK EDGE PULL 1056-4055-P, TYP. AT ALL DRAWERS BLACK OUTLET AT PLYWOOD, TYP. 1/2" DIAMETER WOODEN DOWEL EXTRUDED 2", TYP. GL-02 GL-02 TYPICAL LOCKER 6' - 8 1/2" 4 A8.12 MW-03 MW-03 MW-03 MW-03 LEVEL 02 12' -11 1/2" V3 3 A8.11 MW-03 MW-03 2 LAYERS FB-01 MW-03 2 LAYERS MW-03 BLACK OUTLET AT PLYWOOD, TYP. 4" 1 1/2" 1' - 0 1/2" 5' - 10 1/2" 1 1/2" 1' - 4 1/2" 1 1/2" 1' - 4 1/2" 1 1/2" ONE LAYER, TYP. INSULATION PER PLANS FB-01 2 LAYERS MW-03 MW-03 FLOOR FINISH PER PLANS 2x4 WOOD STUD CONCRETE DECK PER STRUCTURAL MW-03 TWO LAYERS MW-03 1 1/2" 5' - 10 1/2" 10" 4" 1' - 4" 1 1/2" 10 1/2" 1' - 6" CLEATSPROVIDE BACKING AS NECESSARY FOR CLEATS WALL FINISH PER PLANS MW-03 FLOOR FINISH PER PLANS SLAB ON GRADE PER STRUCTURAL 2x4 WOOD STUD MW-03 2 LAYERS FB-01 4" 1' - 6" 1' - 4" 4" 1 1/2" 10 1/2" A8.5 12 LEVEL 01 (SEE 1/A3.0.1) 0' -0" 2' - 3 1/2" 4 1/2" MW-02 CT-03 2" LEVEL 01 (SEE 1/A3.0.1) 0' -0" 2" 3' - 5" MW-02 CT-03 1" LAUNDRY MACHINE BY OWNER LEVEL 02 12' -11 1/2" U6 2" 2' - 3 1/2" 4 1/2" 2' - 10" CT-01 MW-03 FAUCET PER PLUMBING LEVEL 02 12' -11 1/2" U6 4 1/2" 2' - 3 1/2" 2" 1' - 8" 3/4" 2' - 4 1/2" 3/4" 2' - 10" MW-03 CT-01 MW-03 1' - 2" FAUCET PER PLUMBING PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:03:13 PM 2308 MILLWORK DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.11 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1" = 1'-0"1LOWER HUB MILLWORK ELEVATION 1" = 1'-0"2UPPER HUB MILLWORK ELEVATION 1 1/2" = 1'-0"3UPPER HUB MILLWORK SECTION 3" = 1'-0"4PLYWOOD BENCH SECTION DETAIL 1" = 1'-0"8MILLWORK AT WORKSHOP 01 1" = 1'-0"6MILLWORK AT WORKSHOP 02 1" = 1'-0"7MILLWORK AT BREAK ROOM 01 1" = 1'-0"5MILLWORK AT BREAK ROOM 02 No.Description Date 1" 2' - 3 1/2" 1" 1' - 2 3/4" 1" 3 1/4" 1" 3 1/4" 1" 3 1/4" 1" 6 3/4" 1" 10 1/4" 1" 3 1/2" 2x4 WOOD STUD STAINLESS STEEL DRAWER SLIDE, TYP. 1/4" 5/8" 1 1/2" 1 1/2" 3/4" 6' - 8 1/2" 1' - 1 7/8" MW-01 CLEATS 5/8" GL-02 MW-04 ONE LAYER, TYP. IF-01 MW-03 ONE LAYER, TYP. MW-04 ONE LAYER, TYP. BERENSON BRAVO BLACK EDGE PULL 1060-4055-P, TYP. AT ALL DRAWERS 1/4" 1/4" 1/4" GLASS CABINET DOOR LOCK MW-03 ONE LAYER, TYP. 1' - 0 3/8" PROVIDE BACKING AS NECESSARY FOR CLEATS CLEATS IF-01 MW-04 ONE LAYER, TYP. FLOOR FINISH PER PLANS 1" 1' - 6" 1" 1' - 6" 1" 1' - 6" 1" 1' - 6" 1" 3 1/2" STRAIGHT HASP, TYP 1/4" 1/4" 1/4" 5/8" BERENSON BRAVO BLACK EDGE PULL 1060-4055-P, TYP. AT ALL LOCKERS 3/4" 5/8" MW-01 2x4 WOOD STUD MW-03 ONE LAYER, TYP. MW-03 ONE LAYER, TYP. MW-03 ONE LAYER, TYP. MW-03 ONE LAYER, TYP. CLEATS 1' - 6 3/4" MW-03 ONE LAYER, TYP. CLEATS PROVIDE BACKING AS NECESSARY FOR CLEATS 1' - 1 7/8" MW-03 ONE LAYER IF-01 MW-04 ONE LAYER 2x4 WOOD STUD STAINLESS STEEL DRAWER SLIDE, TYP. 1/2" DIAMETER WOODEN DOWEL EXTRUDED 2", TYP. BERENSON BRAVO BLACK EDGE PULL 1060-4055-P, TYP. AT ALL DRAWERS MW-03 ONE LAYER 3/4" 3' - 8 3/8" 1" 9 1/4" 1" 9 1/4" 1" 10 1/4" 1" 3 1/2" 6' - 9 1/4" 5/8" 5/8" 7/8" MW-01 CLEATS 1' - 0" 1' - 3" CLEATS PROVIDE BACKING AS NECESSARY FOR CLEATS BERENSON BRAVO BLACK EDGE PULL 1060-4055-P, TYP. AT ALL DRAWERS MW-03 MW-03 ONE LAYER 1/2" DIAMETER WOODEN DOWEL EXTRUDED 2", TYP. MW-04 ONE LAYER MW-03 MW-03 MW-03 ONE LAYER 1' - 6"1" 3/4" 3/4" 1' - 0 3/8" 3/4" 1 1/2" 3/4" 17' - 9 5/8" GLASS CABINET DOOR LOCK GL-02 CLEATS 2' - 5 1/2"1"6"3"3"3"3"3"3"1' - 9 7/8"3 1/4" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:03:18 PM 2308 MILLWORK DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.12 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 3" = 1'-0"2MILLWORK AT LOWER HUB SECTION 02 3" = 1'-0"3MILLWORK AT LOWER HUB SECTION 03 3" = 1'-0"1MILLWORK AT LOWER HUB SECTION 01 1 1/2" = 1'-0"4MILLWORK AT LOWER HUB PLAN No.Description Date HORIZONTAL ASSEMBLY ROOF TYPE C3: BUILDING B ROOF 01 LAYER 1: RF-01 LAYER 2: 1/4" DENSDECK LAYER 3: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 4: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 5: PLYWOOD PER STRUCTURAL LAYER 6: FRAMING PER STRUCTURAL LAYER 7: 5/8" TYPE X GWB WHERE OCCURS NOTES: 1' - 10 3/4" HORIZONTAL ASSEMBLY ROOF TYPE C4: BUILDING B ROOF 02 LAYER 1: RF-01 LAYER 2: 1/4" DENSDECK LAYER 3: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 4: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 5: PLYWOOD PER STRUCTURAL LAYER 6: FRAMING PER STRUCTURAL LAYER 7: 5/8" TYPE X GWB WHERE OCCURS NOTES: 1' - 6 1/2" 2' - 0" 2' - 0" LIGHT FITTING PER SCHEDULE TO REPLACE FULL CEILING TILE HVAC REGISTER PER SCHEDULE TO REPLACE FULL CEILING TILE VELUX DIFFUSER TO REPLACE CEILING TILE HORIZONTAL ASSEMBLY ROOF TYPE C2: BUILDING A ROOF LAYER 1: RF-01 LAYER 2: 1/4" DENSDECK LAYER 3: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 4: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 5: PLYWOOD PER STRUCTURAL LAYER 6: FRAMING PER STRUCTURAL LAYER 7: IF-01 WHERE OCCURS NOTES: HORIZONTAL ASSEMBLY CEILING TYPE B4: PLYWOOD CEILING LAYER 1: FRAMING PER STRUCTURAL LAYER 2: FURRING STRIPS FASTENED WITH GRK FIN TRIM SCREWS LAYER 3: MW-01 NOTES: HORIZONTAL ASSEMBLY ROOF TYPE C1: BUILDING A ROOF AT MPR LAYER 1: RF-01 LAYER 2: 1/4" DENSDECK LAYER 3: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 4: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 5: PLYWOOD PER STRUCTURAL LAYER 6: FRAMING PER STRUCTURAL LAYER 7: PET CLIPS PER POLYSORB MANUFACTURER INSTALLED @ 24" OC LAYER 7: FC-01 NOTES: POLYSORB WHERE OCCURS RUN CONDUIT CLOSE TO TOP OF CEILING HORIZONTAL ASSEMBLY CEILING TYPE B2: EXTERIOR TILE SOFFIT LAYER 1: FRAMING PER STRUCTURAL LAYER 2: WRB-01 LAYER 3: 1/2" CEMENT BACKERBOARD LAYER 4: WRB-02 LAYER 5: THIN SET MORTAR LAYER 6: TI-01 NOTES: 6 3/4" HORIZONTAL ASSEMBLY CEILING TYPE B3: ACT CEILING LAYER 1: ACT-01 NOTES: HORIZONTAL ASSEMBLY ROOF TYPE C5: BUILDING B ELEVATOR ROOF LAYER 1: RF-01 LAYER 2: 1/4" DENSDECK LAYER 3: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 4: 2.6" SARNATHERM POLYISOCYANURATE INSULATION LAYER 5: PLYWOOD PER STRUCTURAL LAYER 6: FRAMING PER STRUCTURAL NOTES: HORIZONTAL ASSEMBLY CEILING TYPE B1: GWB CEILING LAYER 1: FRAMING PER STRUCTURAL LAYER 2: 5/8" TYPE X GWB, NOTES: FINISH PER PLANS, IF-03 WHERE OCCURS 6 1/8" HORIZONTAL ASSEMBLY FLOOR TYPE A1: CONCRETE SLAB ON GRADE LAYER 1: CONCRETE AND UNDERLAYMENT PER STRUCTURAL NOTES: FINISH PER PLANSTHICKNESS PER STRUCTURAL HORIZONTAL ASSEMBLY FLOOR TYPE A2: CONCRETE METAL DECK AT LEVEL 02 LAYER 1: FINISH PER PLANS LAYER 2: LIGHT WEIGHT CONCRETE PER STRUCTURAL LAYER 3: METAL DECK PER STRUCTURAL NOTES: FINISH PER PLANS 6 1/4" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:02:04 PM 2308 TYPICAL ASSEMBLIES MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 3" = 1'-0"9ROOF TYPE C3 3" = 1'-0"10ROOF TYPE C4 1/2" = 1'-0"12ACT-01 PATTERN DETAIL 3" = 1'-0"8ROOF TYPE C2 3" = 1'-0"5CEILING TYPE B3 3" = 1'-0"7ROOF TYPE C1 3" = 1'-0"6SOFFIT TYPE B4 3" = 1'-0"4CEILING TYPE B2 3" = 1'-0"11ROOF TYPE C5 3" = 1'-0"3CEILING TYPE B1 No.Description Date 3" = 1'-0"1FLOOR TYPE A1 3" = 1'-0"2FLOOR TYPE A2 DOOR PER SCHEDULE INTERIOR EXTERIOR ALIGN CO-02CO-02 CAULKING AND BACKER ROD INTERIOR EXTERIOR DOOR PER SCHEDULE CO-02 CO-02 CAULKING AND BACKER ROD CAULKING AND BACKER ROD DOOR PER SCHEDULE INTERIOR EXTERIOR CAULKING AND BACKER ROD WRB-02 IF-01 HEADER PER STRUCTURAL CEMENTITIOUS BOND COAT PER PLANS TI-01 CEMENT BACKERBOARD PER PLANS PLYWOOD PER STRUCTURAL WRB-01 FRY REGLET DRML-625 DRYWALL TRIM FRY REGLET DRYWALL T MOLDING TDM-625-75 COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER INTERIOR EXTERIOR DOOR PER SCHEDULE WRB-01 IF-01 INSULATION PER PLANS FRAMING PER STRUCTURAL TI-01 CEMENTITIOUS BOND COAT PER PLANS PLYWOOD PER STRUCTURAL CAULKING WRB-02 FRY REGLET DRML-625 DRYWALL TRIM CEMENT BACKERBOARD PER PLANS COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER DOOR PER SCHEDULE INTERIOR EXTERIOR CAULKING AND BACKER ROD ALIGN IF-01 HEADER PER STRUCTURAL FRY REGLET DRML-625 DRYWALL TRIM COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER WRB-01 DENSGLASS SHEATHING PER PLAN WD-01 RAIL SYSTEM PER PLANS PLYWOOD PER STRUCTURAL 2% SLOPE 16 GA. GALVANIZED STEEL L ANGLE WD-01 1 1/2" INTERIOR DOOR PER SCHEDULE IF-01 INSULATION PER PLANS FRAMING PER STRUCTURAL CAULKING FRY REGLET DRML-625 DRYWALL TRIM COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER EXTERIOR WRB-01 WD-01 RAIL SYSTEM PER PLANS PLYWOOD PER STRUCTURAL DENSGLASS SHEATHING PER PLANS 16 GA. GALVANIZED STEEL L ANGLE WD-01 1 1/2" CRL PH20A SERIES TOP DOOR PATCH FITTING W/ INT303 INSERT CRL STANDARD 4" HEADER CRL STANDARD CONCEALED DOOR CLOSER FASTENER (TYPE, QUANTITY AND SPACING TBD BY ENGINEERING) ALIGN IF-01 IF-01 FRY REGLET 'J' MOLD SHEATHING PER STRUCTURAL CRL STANDARD 4" HEADER DOOR STOP CRL 1NT307A (@SINGLE DOOR) CRL 1NT308A (@DOUBLE DOORS) FASTENER (TYPE, QUANTITY, AND SPACING TBD BY ENGINEERING) ALIGN IF-01IF-01 FRY REGLET 'J' MOLD SHEATHING PER STRUCTURAL PIVOT CRL 1NT403 ADJUSTABLE FREE SWINGING FLOOR PIVOT CRL PH10C SERIES BOTTOM DOOR PATCH FITTING W/ 1NT301 INSERT GL-02 IF-01 PLYWOOD PER STRUCTURAL 3" DIMENSION VARIES PER STYLE DOOR HANDLE, STYLE CAN VARYCRL WU3 SERIES 1" DEEP U-CHANNEL WU3 SERIES END CAP CRL AMR209 KEEPER (OPTIONAL) CRL AMR205 SERIES BOTTOM DOOR LOCK PATCH WITH CYLINDER/THUMBTURN (CYLINDER OPTIONAL) CRL 1NT403 ADJUSTABLE FREE SWINGING FLOOR PIVOT CONCRETE TOPPING AND DECK PER STRUCTURAL FLOOR FINISH PER PLANS CRL PH10C SERIES BOTTOM DOOR PATCH ITTING W/ 1NT301 INSERT FLOOR FINISH PER PLANS DOOR PER SCHEDULE INTERIOR EXTERIOR GL-01 GL-01 WEATHERSTRIPPING DOOR PER SCHEDULE INTERIOR EXTERIOR ALIGN ALIGN DOOR PER SCHEDULE HM FRAME INSULATION PER PLANS IF-01 INTERIOR EXTERIOR DRYWALL J MOLD WRB-01 WD-01 RAIL SYSTEM PER PLANS PLYWOOD PER STRUCTURAL COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER DOOR PER SCHEDULE HM FRAME INSULATION PER PLANS IF-01 IF-01 DRYWALL J MOLD DRYWALL J MOLD CAULKING HOLLOW METAL DOOR PER SCHEDULE INTERIOR EXTERIOR FLOOR FINISH PER PLANS CONCRETE SLAB PER STRUCTURAL THRESHOLD #1675A, ZERO INTERNATIONAL EXTERIOR FLOOR FINISH PER LANDSCAPE DOOR BOTTOM PER HARDWARE SCHEDULE FINISH PER PLAN DOOR PER SCHEDULE 1/4" MAX. 1/4" INTERIOR EXTERIOR STOREFRONT DOOR PER SCHEDULE FLOOR FINISH PER PLANS CONCRETE SLAB PER STRUCTURAL THRESHOLD #102A, ZERO INTERNATIONAL MAX. 1/2" EXTERIOR FLOOR FINISH PER LANDSCAPE DOOR BOTTOM PER HARDWARE SCHEDULE DOOR PER SCHEDULE ALUMINUM KNOCKDOWN FRAME WITH FLUSH CASING INSULATION PER PLANS IF-01 DRYWALL J MOLD FINISH PER PLAN DOOR PER SCHEDULE MIN. 1/4" FLOOR FINISH PER PLANS LIGHTWEIGHT CONCRETE PER STRUCTURAL STRUCTURAL SILICONE W/ BACKER ROD ALUMINUM GLAZING CHANNEL NEOPRENE SETTING BLOCK ROOM INTERIORROOM EXTERIOR FLOOR FINISH PER PLANS CRL 1NT403 ADJUSTABLE FREE SWINGING FLOOR PIVOT CONCRETE SLAB PER STRUCTURAL FLOOR FINISH PER PLANS CRL PH10C SERIES BOTTOM DOOR PATCH ITTING W/ 1NT301 INSERT FLOOR FINISH PER PLANS STOREFRONT PER SCHEDULE CRL STANDARD 2" HEADER ALIGN HEADER PER STRUCTURAL INSULATION PER PLANS MW-01 ACT PER PLANS CLEATS 1/2" 2" EQ EQ IF-01 IF-01 STOREFRONT PER SCHEDULE INSULATION PER PLANS PLYWOOD PER STRUCTURAL ALUMINUM GLAZING CHANNELALIGN SHIM FLUSH EQ EQ ROOM INTERIORROOM EXTERIOR FRAMING PER STRUCTURAL EQ EQ INSULATION PER PLANS ALIGN STOREFRONT PER SCHEDULE ALUMINUM GLAZING CHANNEL SHIM FLUSH FRAMING PER STRUCTURAL IF-01 EQ EQ IF-01 FRAMING PER STRUCTURAL STOREFRONT PER SCHEDULE INSULATION PER PLANS ALUMINUM GLAZING CHANNEL SHIM FLUSH CEILING FINISH PER PLANS FRAMING PER STRUCTURAL FLOOR FINISH PER PLANS SLAB ON GRADE PER STRUCTURAL STRUCTURAL SILICONE W/ BACKER ROD ALUMINUM GLAZING CHANNEL NEOPRENE SETTING BLOCK ROOM INTERIORROOM EXTERIOR FLOOR FINISH PER PLANS 1" DEEP 'U' CHANNEL FRAMING PER STRUCTURAL INSULATION PER PLANS IF-01 STOREFRONT PER SCHEDULE CAULKING PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:02:13 PM 2308 DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 3" = 1'-0"2STOREFRONT DOOR HEADER AT CONC. 3" = 1'-0"3STOREFRONT DOOR JAMB AT CONCRETE 3" = 1'-0"7STOREFRONT PIVOT DOOR HEADER AT TILE 3" = 1'-0"8STOREFRONT DOOR JAMB AT TILE 3" = 1'-0"12STOREFRONT DOOR HEADER AT KEBONY 3" = 1'-0"13STOREFRONT DOOR JAMB AT KEBONY 3" = 1'-0"17 CRL GLASS DOOR HEAD AT RECESSED CLOSER 3" = 1'-0"22CRL GLASS DOOR HEAD AT DOOR STOP 3" = 1'-0"29 CRL GLASS DOOR JAMB AT SIDELIGHT AT HINGE 3" = 1'-0"30CRL GLASS DOOR JAMB AT DOOR HANDLE 3" = 1'-0"28CRL GLASS DOOR JAMB AT SIDELIGHT 3" = 1'-0"16GLASS DOOR AT SILL PIVOT ON LEVEL 02 3" = 1'-0"11STOREFRONT DOOR HEADER AT GLAZING 3" = 1'-0"4METAL DOOR HEADER/JAMB AT CONCRETE 3" = 1'-0"14 METAL DOOR JAMB AT KEBONY EXT. WALL 3" = 1'-0"9METAL DOOR HEADER/JAMB AT INT. WALL 3" = 1'-0"10METAL DOOR SILL EXTERIOR 3" = 1'-0"15METAL DOOR SILL INTERIOR 3" = 1'-0"1TYP. STOREFRONT DOOR SILL 3" = 1'-0"5SOLID WOOD VENEER DOOR JAMB/HEADER 3" = 1'-0"20SOLID WOOD VENEER DOOR SILL 3" = 1'-0"26INT. GLAZING BASE DETAIL AT LEVEL 02 3" = 1'-0"21GLASS DOOR AT SILL PIVOT ON LEVEL 01 3" = 1'-0"24INT. CURTAIN WALL HEADER AT PLYWOOD 3" = 1'-0"27INTERIOR CURTAIN WALL HEADER DETAIL 3" = 1'-0"18INT.CURTAIN WALL DETAIL AT DRYWALL 3" = 1'-0"19INT. GLAZING HEAD DETAIL AT DRYWALL 3" = 1'-0"23INT. GLAZING BASE DETAIL AT LEVEL 01 25 3" = 1'-0"6CASEMENT JAMB AT FIXED WINDOW No.Description Date 3" = 1'-0"25INT.CURTAIN WALL JAMB AT GWB WINDOW PER SCHEDULE INTERIOR EXTERIOR IF-01 HEADER PER STRUCTURAL FRY REGLET DRML-625 DRYWALL TRIM SHADE PER SCHEDULE WRB-01 PLYWOOD PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS DENSGLASS SHEATHING PER PLAN 16 GA. GALVANIZED STEEL L ANGLE 2% SLOPE WD-01 1 1/2" COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER INTERIOR EXTERIOR WRB-01IF-01 HEADER PER STRUCTURAL CEMENT BACKERBOARD PER PLAN TI-01 CEMENTITIOUS BOND COAT PER PLANS FRY REGLET DRYWALL TRIM WRB-02 METAL TRIM TI-01 PLYWOOD PER STRUCTURAL STOREFRONT PER SCHEDULE SHADES PER SCHEDULE FRY REGLET DRYWALL T MOLDING TDM-625-75MINERAL WOOL AND UL LISTED SEALANT PER STOREFRONT MANUFACTURER COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER INTERIOR EXTERIOR WRB-01 IF-01 INSULATION PER PLANS FRAMING PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS PLYWOOD PER STRUCTURAL DENSGLASS SHEATHING PER PLAN FRY REGLET DRML-625 DRYWALL TRIM STOREFRONT PER SCHEDULE WD-01 16 GA. GALVANIZED STEEL L ANGLE 1 1/2" COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER INTERIOR EXTERIOR STOREFRONT PER SCHEDULE IF-01 INSULATION PER PLANS FRAMING PER STRUCTURAL FRY REGLET DRML-625 DRYWALL TRIM WRB-02 TI-01 CEMENTITIOUS BOND COATPER PLANS PLYWOOD PER STRUCTURAL CEMENT BACKERBOARD PER PLAN WRB-01 MINERAL WOOL AND UL LISTED SEALANT PER STOREFRONT MANUFACTURER COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER DOOR PER SCHEDULE INTERIOREXTERIOR WEATHERSTRIPPING GL-01 FLOOR FINISH PER PLANS SLAB ON GRADE AND FOOTING PER STRUCTURAL PLANTING/HARDS CAPE PER LANDSCAPE STOREFRONT PER SCHEDULE CAULKING AND BACKER ROD CO-02 INTERIOR EXTERIOR MIN. 6" 1/2" 2% CURB WIDTH PER SLAB PLAN STOREFRONT PER SCHEDULE CAULKING AND BACKER ROD WRB-01 HEADER PER STRUCTURAL TILE FINISH PER PLANS CEMENT BACKERBOARD PER PLANS WRB-02 IF-01 COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER INTERIOR EXTERIORCO-02 STOREFRONT PER SCHEDULE CO-02 CAULKING AND BACKER ROD WINDOW PER SCHEDULE INTERIOR IF-01 HEADER PER STRUCTURAL FRY REGLET DRML-625 DRYWALL TRIM SHADE PER SCHEDULE EXTERIOR WRB-01 PLYWOOD PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS DENSGLASS SHEATHING PER PLAN WD-01 2% SLOPE 16 GA. GALVANIZED STEEL L ANGLE 1 1/2" COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER INTERIOR EXTERIOR WRB-02IF-01 HEADER PER STRUCTURAL CEMENT BACKERBOARD PER PLAN TI-01 CEMENTITIOUS BOND COAT PER PLANS FRY REGLET DRML-625 DRYWALL TRIM WRB-01 TI-01 PLYWOOD PER STRUCTURAL WINDOW PER SCHEDULE SHADE PER SCHEDULE FRY REGLET DRYWALL T MOLDING TDM-625-75MINERAL WOOL AND UL LISTED SEALANT PER WINDOW MANUFACTURER COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER INTERIOR EXTERIOR WINDOW PER SCHEDULE WRB-01 IF-01 INSULATION PER PLANS FRAMING PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS PLYWOOD PER STRUCTURAL DENSGLASS SHEATHING PER PLAN FRY REGLET DRML-625 DRYWALL TRIM WD-01 16 GA. GALVANIZED STEEL L ANGLE SUPERBLOCKING COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER 1 1/2" INTERIOR EXTERIOR WINDOW PER SCHEDULE IF-01 INSULATION PER PLANS FRAMING PER STRUCTURAL FRY REGLET DRML-625 DRYWALL TRIM WRB-02 TI-01 CEMENTITIOUS BOND COAT PER PLANS PLYWOOD PER STRUCTURAL CEMENT BACKERBOARD PER PLAN WRB-01 MINERAL WOOL AND UL LISTED SEALANT PER WINDOW MANUFACTURER COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER WINDOW PER SCHEDULE INTERIOR EXTERIOR WRB-01 IF-01 BLOCKING PER STRUCTURAL PLYWOOD PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS DENSGLASS SHEATHING PER PLAN WD-01 16 GA. GALVANIZED STEEL L ANGLE 2% SLOPE 1 1/2" SUPERBLOCKING VAPROSHIM COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER INTERIOR EXTERIOR WRB-02 IF-01 HEADER PER STRUCTURAL CEMENT BACKERBOARD PER PLAN TI-01 CEMENTITIOUS BOND COAT PER PLANS FRY REGLET DRML-625 DRYWALL TRIM WRB-01 PLYWOOD PER STRUCTURAL WINDOW PER SCHEDULE 2% SLOPEMINERAL WOOL AND UL LISTED SEALANT COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER WINDOW PER SCHEDULE INTERIOR IF-01 HEADER PER STRUCTURAL FRY REGLET DRML-625 DRYWALL TRIM SHADE PER SCHEDULE COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER EXTERIOR WRB-01 PLYWOOD PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS DENSGLASS SHEATHING PER PLAN WD-01 16 GA. GALVANIZED STEEL L ANGLE 2% SLOPE 1 1/2" INTERIOR EXTERIOR WINDOW PER SCHEDULE WRB-01 IF-01 INSULATION PER PLANS FRAMING PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS PLYWOOD PER STRUCTURAL DENSGLASS SHEATHING PER PLAN FRY REGLET DRML-625 DRYWALL TRIM 16 GA. GALVANIZED STEEL L ANGLE WD-01 SUPERBLOCKING 1 1/2" COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER WINDOW PER SCHEDULE INTERIOR EXTERIOR IF-01 HEADER PER STRUCTURAL 2% SLOPE SUPERBLOCKING WRB-01 PLYWOOD PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS DENSGLASS SHEATHING PER PLAN WD-01 16 GA. GALVANIZED STEEL L ANGLE COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER WINDOW PER SCHEDULE INTERIOR IF-01 HEADER PER STRUCTURAL FRY REGLET DRML-625 DRYWALL TRIM SHADE PER SCHEDULE EXTERIOR WRB-01 PLYWOOD PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS DENSGLASS SHEATHING PER PLAN WD-01 16 GA. GALVANIZED STEEL L ANGLE 2% SLOPE 1 1/2" COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER INTERIOR EXTERIOR WINDOW PER SCHEDULE WRB-01 IF-01 INSULATION PER PLANS FRAMING PER STRUCTURAL WD-01 RAIL SYSTEM PER PLANS PLYWOOD PER STRUCTURAL DENSGLASS SHEATHING PER PLAN FRY REGLET DRML-625 DRYWALL TRIM WD-01 16 GA. GALVANIZED STEEL L ANGLE SUPERBLOCKING COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER 1 1/2" WINDOW PER SCHEDULE INTERIOR EXTERIOR CO-02 CO-02 CAULKING AND BACKER ROD WINDOW PER SCHEDULE INTERIOR EXTERIOR 2% SLOPE CO-02 CO-02 CAULKING AND BACKER ROD 1/2" INTERIOR EXTERIOR WINDOW PER SCHEDULE CO-02 CO-02 CAULKING AND BACKER ROD DOOR PER SCHEDULE INTERIOR EXTERIOR CAULKING AND BACKER ROD WRB-02 IF-01 HEADER PER STRUCTURAL CEMENTITIOUS BOND COAT PER PLANS TI-01 CEMENT BACKERBOARD PER PLANS PLYWOOD PER STRUCTURAL WRB-01 FRY REGLET DRML-625 DRYWALL TRIM FRY REGLET DRYWALL T MOLDING TDM-625-75 COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER MAX. 1/4" INTERIOR EXTERIOR STOREFRONT DOOR PER SCHEDULEFLOOR FINISH PER PLANS CONCRETE SLAB PER STRUCTURAL THRESHOLD #102A, ZERO INTERNATIONAL MAX. 1/2" EXTERIOR FLOOR FINISH PER LANDSCAPE 5/16" FLOOR FINISH PER PLANS SLAB ON GRADE AND FOOTING PER STRUCTURAL PLANTING/HARDS CAPE PER LANDSCAPE 6" MIN. STOREFRONT PER SCHEDULE MINERAL WOOL AND UL LISTED SEALANT CO-02 CURB WIDTH PER SLAB PLAN INTERIOR EXTERIOR 2% 1/2" DOOR PER SCHEDULE EXTERIORINTERIOR STOREFRONT PER SCHEDULE DOOR HARDWARE PER DOOR MANUFACTURER GL-01 SILICON SEALANT EXTERIOR INTERIOR DOOR PER SCHEDULE STOREFRONT PER SCHEDULE GL-01 DOOR HARDWARE PER DOOR MANUFACTURER SILICON SEALANT DOOR PER SCHEDULE FLOOR FINISH PER PLANS SLAB ON GRADE PER STRUCTURAL 1/2" MAX. THRESHOLD #1675A ZERO INTERNATIONAL FACE OF FRAMING ABOVE/BELOW FACE OF DRYWALL ABOVE/BELOW WINDOW PER SCHEDULE IF-01 1/2" PLYWOOD IF-01 RESILIENT CHANNEL PER PLANS MT-01 WRB-01 5/8" COMMERCIAL WINDOW RO FLASHING SYSTEM PER SPEC AND MANUFACTURER FRY REGLET H8 DRIP CAP WRB-01 DENSGLASS SHEATHING PER PLAN WD-01 RAIL SYSTEM PER PLANS PLYWOOD PER STRUCTURAL IF-01 INSULATION PER PLANS DOOR PER SCHEDULE PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:02:24 PM 2308 DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.4 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 3" = 1'-0"4TYP. STOREFRONT HEADER AT KEBONY 3" = 1'-0"9TYP. STOREFRONT HEADER AT TILE 3" = 1'-0"5TYP. STOREFRONT JAMB AT KEBONY 3" = 1'-0"10TYP. STOREFRONT JAMB AT TILE 3" = 1'-0"20STOREFRONT DOOR JAMB AT SIDELIGHT 3" = 1'-0"3CURTAIN WALL SILL AT CURB 3" = 1'-0"14STOREFRONT 1061 HEADER DETAIL 3" = 1'-0"15TYP. STOREFRONT JAMB AT CONCRETE 3" = 1'-0"12FIXED WINDOW HEADER AT KEBONY 3" = 1'-0"17FIXED WINDOW HEADER AT TILE 3" = 1'-0"28FIXED WINDOW JAMB AT KEBONY 3" = 1'-0"23FIXED WINDOW JAMB AT TILE 3" = 1'-0"11FIXED WINDOW SILL AT KEBONY 3" = 1'-0"16FIXED WINDOW SILL AT TILE 3" = 1'-0"27TYP. CASEMENT WINDOW HEADER AT KEBONY 3" = 1'-0"24TYP. CASEMENT WINDOW JAMB AT KEBONY 3" = 1'-0"26TYP. CASEMENT WINDOW SILL AT KEBONY 3" = 1'-0"18TYP. AWNING WINDOW HEADER 3" = 1'-0"19TYP. AWNING WINDOW JAMB 3" = 1'-0"22FIXED WINDOW HEADER AT CONCRETE 3" = 1'-0"21FIXED WINDOW SILL AT CONCRETE 3" = 1'-0"29FIXED WINDOW JAMB AT CONCRETE No.Description Date 3" = 1'-0"8STOREFRONT DOOR HEADER AT TILE 3" = 1'-0"1STOREFRONT DOOR 101A SILL 3" = 1'-0"2CURTAIN WALL S1011 SILL AT CURB 3" = 1'-0"7STOREFRONT DOOR 101A AT GLASS HEADER 3" = 1'-0"6STOREFRONT DOOR 101A JAMB AT SIDELIGHT 3" = 1'-0"13OVERHEAD DOOR 107B SILL DETAIL 3" = 1'-0"30WINDOW JAMB B/W WINDOW CLUSTER 212-213 3" = 1'-0"25 METAL DOOR HEADER AT KEBONY EXT. WALL FRAMING PER STRUCTURAL ACOUSTICAL SEALANT FLOOR FINISH PER PLANS IF-01 INSULATION PER PLANS CONCRETE METAL DECK PER STRUCTURAL BF-01 ACOUSTICAL SEALANT IF-01 INSULATION PER PLANS FLOOR FINISH PER PLANS BF-01 FRAMING PER STRUCTURAL ACOUSTICAL SEALANT FLOOR FINISH PER PLANS IF-01 INSULATION PER PLANS CONCRETE METAL DECK PER STRUCTURAL BF-02 FRAMING PER STRUCTURAL INSULATION PER PLANS CONCRETE SLAB PER STRUCTURAL CEMENT BACKERBOARD PER PLANS FLOOR FINISH PER PLANS THIN SET MORTAR COVE BASE TO MATCH TILE FINISH TILE PER PLANS BF-03 FRAMING PER STRUCTURAL INSULATION PER PLANS CONCRETE METAL DECK PER STRUCTURAL CEMENT BACKERBOARD PER PLANS TILE PER PLANS TILE PER PLANS COVE BASE TO MATCH TILE FINISH BF-03 THINSET MORTAR CEMENT BACKERBOARD PER PLANS SCHLUTER JOLLY 1" PROFILE, CLR. ANODIZED WHITE SILICONE FINISH PER PLANS CEMENTITIOUS BOND COAT INSULATION PER PLANS TILE PER PLANS FRY REGLET DRYWALL J MOLDING JDM-625 IF-01 CEMENT BACKERBOARD PER PLANS TILE PER PLANS THINSET MORTAR CONCRETE WALL PER STRUCTURAL CONCRETE SLAB PER STRUCTURAL FLOOR FINISH PER PLANS GROUT COVE BASE TO MATCH TILE FINISH BF-03 FLOOR FINISH PER PLANS FRAMING PER STRUCTURAL INSULATION PER PLANS IF-01 CONCRETE SLAB PER STRUCTURAL GROUT FRY REGLET DRYWALL J MOLDING JDM-625 CEMENT BACKERBOARD PER PLANS COVE BASE TO MATCH TILE FINISH BF-03 FRAMING PER STRUCTURAL FLOOR FINISH PER PLANS MW-01 INSULATION PER PLANS CONCRETE METAL DECK PER STRUCTURAL BF-04 ACOUSTICAL SEALANT CURB PER PLANS EXTERIOR PLANTING/HARDSCAPE PER LANDSCAPE INTERIOR FRAMING PER STRUCTURAL INSULATION PER PLANS FRY REGLET H8 DRIP CAP PLYWOOD PER STRUCTURAL TILE FINISH PER PLANS WRB-01 1' - 0" WRB-02 CEMENT BACKERBOARD PER PLANS MIN. 2" INSULATION PER PLANS SHEATHING PER STRUCTURAL RF-01 FC-01 IF-01 RF-01 MT-01 2% SLOPE TILE FINISH PER PLANS PLYWOOD PER STRUCTURAL WRB-01 HOT-AIR WELD FRAMING PER STRUCTURAL MT-01 DENSDECK PER PLANS 1/2" PLYWOOD CEMENTITIOUS BOND COAT CEMENT BACKERBOARD PER PLANS WRB-02 PET CLIP PER POLYSORB MANUFACTURER FRY REGLET DRYWALL T MOLDING TDM-625-75 PLYWOOD PER STRUCTURAL PLYWOOD PER STRUCTURAL TILE FINISH PER PLANS WRB-01 WRB-01 TILE FINISH PER PLANS FRAMING PER STRUCTURAL INSULATION PER PLANS CEMENTITIOUS BOND COAT CEMENT BACKERBOARD PER PLANS WRB-02 WRB-02 INSULATION PER PLANS WRB-01 TILE FINISH PER PLANS PLYWOOD PER STRUCTURAL FRAMING PER STRUCTURAL TI-02 CEMENTITIOUS BOND COAT FRAMING PER STRUCTURAL CEMENT BACKERBOARD PER PLANS WRB-02 PLYWOOD PER STRUCTURAL HEADER PER STRUCTURAL FRY REGLET DS-75-75 DRIP SCREED WRB-01 WRB-01 WD-01 INSULATION PER PLANS MINI RAIL SYSTEM PER WALL ASSEMBLY TILE FINISH PER PLANS FRAMING PER STRUCTURAL INSULATION PER PLANS VAPROSHIM PER PLANS WRB-02 CEMENT BACKERBOARD PER PLANS WD-01 RF-01 INSULATION PER PLANS SHEATHING PER STRCUTURAL HOT-AIR WELD 2% SLOPE WRB-01 PLYWOOD PER STRCUTURAL INSULATION PER PLANS MINI RAIL SYSTEM PER WALL ASSEMBLY MT-01 1/2" PLYWOOD VAPROSHIM PER PLANS DENSDECK RF-01 CURB PER PLANS EXTERIOR PLANTING/HARDSCAPE PER LANDSCAPE INTERIOR FRY REGLET H8 DRIP CAP PLYWOOD PER STRUCTURAL WRB-01 WD-01 MINI RAIL SYSTEM PER WALL ASSEMBLY FRAMING PER STRUCTURAL INSULATION PER PLANS VAPROSHIM PER PLANS 4" 1' - 0" PRE-FORMED RAINSCREEN VENT COR-A-VENT, ROCK WOOL OR SIM RF-01 HOIST BEAM PER STRUCTURAL SHEATHING PER STRUCTURAL INSULATION PER PLANS IF-01 FRAMING PER STRUCTURAL HOT-AIR WELD 2" MIN. PLYWOOD PER STRUCTURAL INSULATION PER PLANS WRB-01 WD-01 VAPROSHIM PER PLANS MINI RAIL SYSTEM PER WALL ASSEMBLY SARNACLAD FLASHING STRIP CONTINUOUS METAL HOOK STRIP SARNACLAD METAL FASTENED AT 4" OC STAGGERED AND FASTENED PER MANUFACTURER RF-01 ROOF ASSEMBLY PER PLANS RF-01 FRAMING PER STRUCTURAL SHEATHING PER STRUCTURAL INSULATION PER PLANS HOIST BEAM PER STRUCTURAL SHEATHING PER STRUCTURAL INSULATION PER PLANS IF-01 HOT-AIR WELD MIN. 2" 1/2" PLYWOOD HOT-AIR WELD SARNACLAD FLASHING STRIP CONTINUOUS METAL HOOK STRIP SARNACLAD METAL FASTENED AT 4" OC STAGGERED AND FASTENED PER MANUFACTURER RF-01 INSULATION PER PLANS SHEATHING PER STRUCTURAL HOT-AIR WELD MINI RAIL SYSTEM PER WALL ASSEMBLY PLYWOOD PER STRUCTURAL WRB-01 WD-01 VAPROSHIM PER PLANS CONTINUOUS METAL HOOK STRIP MT-01 MT-01 RF-01 2% SLOPE INSULATION PER PLANS SHEATHING PER STRUCTURAL RF-01 RF-01 MT-01 2% SLOPE TILE FINISH PER PLANS PLYWOOD PER STRUCTURAL WRB-01 HOT-AIR WELD FRAMING PER STRUCTURAL DENSDECK PER PLANS 1/2" PLYWOOD CEMENTITIOUS BOND COAT CEMENT BACKERBOARD PER PLANS WRB-02 CONTINUOUS METAL HOOK STRIP MT-01 ACOUSTICAL SEALANT MW-01 INSULATION PER PLANS FLOOR FINISH PER PLANS BF-04 FLOOR FINISH PER PLANS CONCRETE CURB PER PLANS IF-01 CONCRETE SLAB PER STRUCTURAL 6" FRAMING PER STRUCTURAL ACOUSTICAL SEALANT FLOOR FINISH PER PLANS PL-01 INSULATION PER PLANS CONCRETE METAL DECK PER STRUCTURAL PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:02:33 PM 2308 DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.5 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 3" = 1'-0"10WALL BASE AT VINYL TILE 3" = 1'-0"4WALL BASE AT CONCRETE W/ DRYWALL 3" = 1'-0"11WALL BASE AT CARPET 3" = 1'-0"5WALL BASE AT TILE ON CONC. FLOOR 3" = 1'-0"6WALL BASE AT TILE IN STAFF RESTROOM 3" = 1'-0"8WALL TO CEILING AT AT TILE 3" = 1'-0"7GWB TO TILE TRANSITION 3" = 1'-0"9WALL BASE AT CONC. WALL IN RESTROOM 3" = 1'-0"13WALL BASE AT TILE BASE ON DRYWALL 3" = 1'-0"12WALL BASE AT PLYWOOD WALL ON VINYL 3" = 1'-0"18TILE SILL AT EXTERIOR 3" = 1'-0"22TYP. PARAPET TILE WALL AT BLDG A 3" = 1'-0"20TILE NICHE DETAIL 3" = 1'-0"16TILE INSIDE CORNER DETAIL 3" = 1'-0"17CORNER DETAIL AT WOOD AND TILE EDGE 3" = 1'-0"21TYP. PARAPET KEBONY WALL AT BLDG. A 3" = 1'-0"19KEBONY SILL TO EXTERIOR 3" = 1'-0"23PARAPET AT ELEVATOR 3" = 1'-0"26INT. PARAPET AT ELEVATOR 3" = 1'-0"1AWNING SILL AT FIXED WINDOW 3" = 1'-0"2DOUBLE CASEMENT WINDOW JAMB 3" = 1'-0"25TYP. PARAPET KEBONY WALL AT BLDG B 3" = 1'-0"24TYP. PARAPET TILE WALL AT BLDG B 3" = 1'-0"14WALL BASE AT PLYWOOD 3" = 1'-0"3WALL BASE AT CONCRETE No.Description Date 3" = 1'-0"15PLYWOOD BASE AT VINYL TILE STRINGER PER STRUCTURAL MW-01 INSULATION PER PLANS FF-01 1/2" PLYWOOD CAULKING INSULATION PER PLANS CEILING FINISH PER PLANS MW-01 CLEATS CEILING FRAMING PER STRUCTURAL 1/2" IF-01 CO-02 FRAMING PER STRUCTURAL TILE FINISH PER PLANS WRB-01 CO-02 CEILING FRAMING PER STRUCTURAL WRB-02 CEMENTITIOUS BOND COAT CEMENT BACKERBOARD PER PLANS MW-01 CEILING FINISH PER PLANS FRAMING PER STRUCTURAL INSULATION PER PLANS FURRING STRIPS CLEATS MW-01GRK FIN TRIM HEAD SCREWS INSULATION PER PLANS CONCRETE DECK PER STRUCTURAL FLOOR FINISH PER PLANS IF-01 FRAMING PER STRUCTURAL PROVIDE RIGID FOAM FILLER AT OPEN VOIDS BETWEEN FRAME WALL AND METAL DECK WD-01 WRB-01 INSULATION PER PLANS VAPROSHIM PER PLANS TILE PER PLANS MINI RAIL SYSTEM PER WALL ASSEMBLY WRB-01 CEMENTITIOUS BOND COAT CEMENT BACKERBOARD PER PLANS WRB-02 1/2" CEILING FINISH PER PLANS WRB-02 WRB-01 FRAMING PER STRUCTURAL INSULATION PER PLANS PLYWOOD PER STRUCTURAL TILE FINISH PER PLANS CEMENTITIOUS BOND COAT CEMENT BACKERBOARD PER PLANS WRB-01 WRB-02 FRY REGLET DRYWALL T MOLDING TDM-625-75 PLYWOOD PER STRUCTURAL FF-01 STRINGER PER STRUCTURAL STAIR NOSING: JOHNSONITE, RCN- XX-A, FINISH CHARCOAL 20, TYP. FOR CONTRASTING STRIPE USE JOHNSONITE: VIRCN-XX-B2. FINISH CHARCOAL 20. STRINGER PER STRUCTURAL IF-01 INSULATION PER PLANS CAULKING FF-01 1/2" PLYWOOD 1 1/2 " HOT ROLLED STEEL PIPE; FINISH PT-03 5/8" STEEL ROD AT 4'-0" O.C. ORIENTED PERPENDICULAR TO HANDRAIL 1 1/2" 3" 3'-0' TO FINISH FLOOR STEEL PLATE 1 1/2 " HOT ROLLED STEEL PIPE; FINISH PT-03 5/8" STEEL ROD AT 4'-0" O.C. ORIENTED PERPENDICULAR TO HANDRAIL LAG SCREWS TO BLOCKING BLOCKING 1 1/2" 3" 3'-0' TO FINISH FLOOR IF-01 FRAMING PER STRUCTURAL RF-01 FC-01 INSULATION PER PLANS SHEATHING PER STRUCTURAL BEAM PER STRUCTURAL ROOF ASSEMBLY PER PLANS FRAMING PER STRUCTURAL DENSDECK PER PLANS PET CLIP PER POLYSORB MANUFACTURER CEILING FINISH PER PLANS BLOCKING TO FUR OUT CEILING FRAMING PER STRUCTURAL IF-01 INSULATION PER PLANS HSS3x3x1/8" WM-01WM-01 WELDED TO STEEL ANGLE WELDED TO STEEL ANGLE PT-02 CAULKING DRYWALL J MOLD INSULATION PER PLANS FRAMING PER STRUCTURAL IF-01 CAULKING DRYWALL J MOLD 3/4" MDF PAINTED TO MATCH PT-04 1 1/2 " HOT ROLLED STEEL PIPE 5/8" STEEL ROD AT 4'-0" O.C. ORIENTED PERPENDICULAR TO HANDRAIL LAG SCREWS TO BLOCKING BLOCKING 1 1/2" 3" 3'-0' TO FINISH FLOOR IF-01 PT-02 PT-02 WALL FINISH PER PLANS ACT PER PLANS 6" PLYWOOD PER STRUCTURAL FRY REGLET DS-75-75 DRIP SCREED WRB-01 WD-01 INSULATION PER PLANS MINI RAIL SYSTEM PER WALL ASSEMBLY TI-01 IF-01 WRB-01 PLYWOOD PER STRUCTURAL FRAMING PER STRUCTURAL INSULATION PER PLANS INSULATION PER PLANS FRAMING PER STRUCTURAL WRB-02 CEMENT BACKERBOARD PER PLANS TI-01 WRB-01 WRB-02 WD-01 CEMENT BACKERBOARD PER PLANS1/2" TI-01 WRB-01 WRB-02 WD-01 1/2" 4" 4" REVEAL FLASHING SA PER WATERPROOFING MANUFACTURER 4" 4"REVEAL FLASHING SA PER WATERPROOFING MANUFACTURER PLYWOOD PER STRUCTURAL INSULATION PER PLANS MINI RAIL SYSTEM PER WALL ASSEMBLY VAPROSHIM PER PLANS WD-01 WRB-01 IF-01 CO-02 REVEAL FLASHING SA PER WATERPROOFING MANUFACTURER BACKER ROD AND SILCONE CAULKING METAL L ANGLE, FINISH PT- CO-02 TI-01 WRB-01 INSULATION PER PLANS PLYWOOD PER STRUCTURAL WRB-02 CEMENT BACKERBOARD PER PLANS JPM-75-300, FRY REGLET 'J' MOLD BACKER ROD AND SILICONE CAULKING TI-01 WRB-01 WRB-02 CEMENT BACKERBOARD PER PLANS JPM-75-300, FRY REGLET 'J' MOLD BACKER ROD AND SILICONE CAULKING PLYWOOD PER STRUCTURAL WD-01 WRB-01 PLYWOOD PER STRCUTURAL INSULATION PER PLANS MINI RAIL SYSTEM PER WALL ASSEMBLY FRAMING PER STRUCTURAL IF-01 WD-01 WRB-01 MINI RAIL SYSTEM PER WALL ASSEMBLY PLYWOOD PER STRCUTURAL 2X KEBONY BOARD, LAPPED AT CORNER - 2X6 MIN. W/ RISER SUPPORTS (2) PRO PLUG SYSTEM SCREW AND PLUG FOR KEBONY PER BOARD AS REQUIRED AT CORNER BOARDS - SET OVER RISER SUPPORTS FASTENERS ON RISER SUPPORTS FASTENERS ON RISER SUPPORTS 1" MIN. FROM EDGE WHEN POSSIBLE 1/8" GAP WRAP CORNER AND TAPE SEAMS OF WATERPROOFING PLYWOOD PER STRUCTURAL PLYWOOD PER STRUCTURAL WRB-01 WRB-01 TILE FINISH PER PLANS FRAMING PER STRUCTURAL INSULATION PER PLANS FRAMING PER STRUCTURAL IF-01 TI-01 TI-01 WRB-02 WRB-02 ROUNDED EDGE GROUT AT CORNERS CEMENT BACKERBOAD PER PLANS BEAM PER STRUCTURAL 1" 4" 1" MIN. 7" FINISH FLOOR PER PLANS FINISH FLOOR PER PLANS DOOR PER SCHEDULE CEILING FINISH PER PLANS CEILING FINISH PER PLANS INSULATION PER PLANS WRB-01 TILE FINISH PER PLANS WRB-02 EXTERIOR DECK 1% SLOPE CEMENTITIOUS BOND COAT CEMENT BACKERBOARD PER PLANS FRAMING PER STRUCTURAL PLYWOOD PER STRUCTURAL DK-01 TRAFFIC TOPPING DEX-O-TEX WATERPROOFING MEMBRANE 24 GA METAL FLASHING SANITARY COVE BASE PER TILE MANUFACTURER TI-01 WRB-02 CEMENTITIOUS BOND COAT PER PLANS CEMENT BACKERBOARD PER PLANS WRB-01 PLYWOOD PER STRUCTURAL CURB PER PLANS INSULATION PER PLANS CONCRETE METAL DECK PER STRUCTURAL 1/2" CEILING FINISH PER PLANS CLEATS MW-01 INSULATION PER PLANS PLYWOOD PER STRUCTURAL CEILING FRAMING PER STRUCTURAL DOOR PER SCHEDULE MODERCO PN-83 POCKET DOOR PROVIDE SOLID BLOCKING PROVIDE SOLID BLOCKING 4' - 11 7/8" STACKABLE PARTITION 3' - 8 3/8" PROVIDE SOLID BLOCKING PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:02:42 PM 2308 DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.6 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 3" = 1'-0"4STAIR DETAIL AT PLYWOOD WALL 3" = 1'-0"1PLYWOOD TO DRYWALL CEILING 3" = 1'-0"11DRYWALL CEILING TO CONCRETE WALL 3" = 1'-0"10TILE CEILING TO CONCRETE WALL 3" = 1'-0"2PLYWOOD OUTSIDE CORNER 3" = 1'-0"18INT. WALL TO METAL DECK 3" = 1'-0"12KEBONY WALL TO TILE SOFFIT 3" = 1'-0"3TILE OUTSIDE CORNER DETAIL 1 1/2" = 1'-0"7STAIR STRINGER DETAIL 3" = 1'-0"5STAIR DETAIL AT DRYWALL 3" = 1'-0"15HANDRAIL AT CONCRETE WALL 3" = 1'-0"16HANDRAIL AT DRYWALL 3" = 1'-0"14GLB TO ROOF DETAIL 3" = 1'-0"13CEILING BLOCKING AT BLDG B 3" = 1'-0"17FENCE JAMB/HEADER DETAIL 3" = 1'-0"9RAILING AT DRYWALL TOP 3" = 1'-0"19DRYWALL AT ACT CEILING 3" = 1'-0"20KEBONY AND TILE OUTSIDE CORNER PLAN 3" = 1'-0"24KEBONY AND TILE INSIDE CORNER PLAN DETAIL 3" = 1'-0"21KEBONY TO CONCRETE INSIDE CORNER PLAN 3" = 1'-0"25TILE EDGE TO CONCRETE PLAN DETAIL 3" = 1'-0"26TYP. KEBONY CORNER PLAN DETAIL 3" = 1'-0"22TILE NICHE CORNER PLAN DETAIL 3" = 1'-0"23DOOR 101Q - SECTION 3" = 1'-0"28TILE WALL TOP EDGE 3" = 1'-0"27TILE CORNER AT DEX O TEX DETAIL No.Description Date 3" = 1'-0"6PLYWOOD TO CEILING DETAIL 3/4" = 1'-0"8OPERABLE PARTITIONS MODERCO PLAN DETAIL 13 A8.7 15 A8.7 PLANTER PLANTER 11' - 2 3/4" 9' - 10" 7' - 11 3/4" 29' - 0 3/8" 15 A8.7 1' - 6" 2' - 2" 3" 3' - 11" WD-02 CONCRETE SLAB PER STRUCTURAL A8.7 16 1/2" PRESSURE TREATED SLEEPERS 5 1/2" 3' - 8 3/4" WD-02 PLANTING PER LANDSCAPE CONCRETE SLAB PER STRUCTURAL A8.7 16 5 1/2" 7/8" LEVEL 01 3' - 10 7/8" MIN. 1' - 0" CONCRETE FOOTING PER STRUCTURAL 1' - 0" 6" 1' - 2 5/8" 1/2" 1' - 4" 1/2" PRESSURE TREATED SLEEPERS 1/2" 1' - 4 3/4" 1' - 4" 2' - 3 1/4" WRB-04 WD-02 3/16"5/4×6 CLEAR KEBONY DECK BOARD 1/2" PRESSURE TREATED SLEEPERS FRY REGLET H8 DRIP CAP MINI RAIL SYSTEM PER WALL ASSEMBLY VAPROSHIM PER PLANS WD-01 MT-01 2% SLOPE CO-02 PLYWOOD PER STRUCTURAL INSULATION PER PLANS DENSGLASS SHEATHING PER PLANS 2x4 FRAMING TO FUR OUT SHARP ANGLE BETWEEN CONCRETE AND KEBONY WALL CO-02 WD-01 WRB-01 PLYWOOD PER STRUCTURAL MINI RAIL SYSTEM PER WALL ASSEMBLY VAPROSHIM PER PLANS DENSGLASS SHEATHING PER PLANS MT-01 2x4 FRAMING TO FUR OUT SHARP ANGLE BETWEEN CONCRETE AND KEBONY WALL WRB-01 IF-01 INSULATION PER PLANS (A) PLAN DETAIL AT SHARP ANGLE BETWEEN KEBONY AND CONCRETE WALL(B) SECTION DETAIL AT SHARP ANGLE BETWEEN KEBONY AND CONCRETE WALL DK-01 TRAFFIC TOPPING DECK COVERING WATERPROOFING PER DECKING MANUFACTURER SEALANT PER DECKING MANUFACTURER WRB-01 24 GA METAL FLASHING 24 GA METAL FLASHING WITH DRIP EDGE 1/2" PLYWOOD 2x4 FRAMING TO FUR OUT SHARP ANGLE BETWEEN CONCRETE AND KEBONY WALL 1/2" PLYWOOD SILICONE CAULKING DEX-O-TEX WATERPROOF MEMBRANE DEX-O-TEX SLIP SHEET DK-01 TRAFFIC TOPIC MEMBRANE ROOF DRAIN PER PLUMBING 1/8"/FT 1/8"/FT CONCRETE DECK PER STRUCTURAL 7 / 1 6 " ANCHORS BY INSTALLER 1/8" L-3 FRAME BY BASEMAT MANUFACTURER, MATCH FRAME COLOR TO BASEMAT BASEMAT PER SCHEDULE MAX. 1/4" INTERIOREXTERIOR STOREFRONT DOOR PER SCHEDULE CONCRETE SLAB PER STRUCTURALTHRESHOLD #102A, ZERO INTERNATIONAL EXTERIOR FLOOR FINISH PER LANDSCAPE SQUARE VINYL FILLER PER MANUFACTURER BASEMAT RAIL PER MANUFACTURER L-3 FRAME BY BASEMAT MANUFACTURER, MATCH FRAME COLOR TO BASEMAT ANCHORS BY INSTALLER VINYL CUSHION PER MANUFACTURER MAX. 1/2" 7 / 1 6 " CONCRETE SLAB PER STRUCTURAL CONCRETE DECK PER STRUCTURAL DK-01 TRAFFIC TOPPING DECK COVERING WATERPROOFING PER DECKING MANUFACTURER DECK COVERING SLIPSHEET PER DECKING MANUFACTURER SEALANT PER DECKING MANUFACTURER SAW CUT REGLET ALTERNATE FLASHING PER DECKING MANUFACTURER CO-02 4" EXTERIOR CONCRETE DECK PER STRUCTURAL INTERIOR FRY REGLET H7 | H8 DRIP CAP PLWYOOD PER STRUCTURAL WRB-01 WD-01 MINI RAIL SYSTEM PER WALL ASSEMBLY VAPROSHIM PER PLANS PRE-FORMED RAINSCREEN VENT COR-A-VENT, ROCK WOOL OR SIM DK-01 TRAFFIC TOPPING DEX-O-TEX WATERPROOFING MEMBRANE SEALANT PER DECKING MANUFACTURER 24 GA METAL FLASHING MIN. 4" DENSGLASS SHEATHING PER PLANS 2% SLOPE MT-01 CO-02 CONTINUOUS METAL HOOK STRIP MT-01 3' - 0" 3' - 0" 3' - 0"3' - 0" 3' - 0" 3' - 0" 20 A8.6 3 A8.6 17 A8.5 DOOR PER SCHEDULE GLAZING DOOR PER SCHEDULE GLAZING EXTERIOR INTERIOR PEMCO 355_S "T" ASTRAGAL; FINISH355DS CONCRETE PER STRUCTURAL GRIT STRIP METAL NOSING WITH CONTRASTING STRIPE INSTALLED WITH NEOPRENE CONTACT CEMENT DECK COVERING WEAR LAYER AND FINISHING COATS DECK COVERING WATERPROOF MAMBRANE 26GA. SHEET METAL FLASHING DK-01 CONCRETE PER STRUCTURAL DK-01 TRAFFIC TOPPING DECK COVERING WATERPROOFING PER DECKING MANUFACTURER DECK COVERING SLIPSHEET PER DECKING MANUFACTURER SEALANT PER DECKING MANUFACTURER SAW CUT REGLET ALTERNATE FLASHING PER DECKING MANUFACTURER CO-02 4" CONCRETE PER STRUCTURAL GRIT STRIP METAL NOISING INSTALLED WITH NEOPRENE CONTACT CEMENT DECK COVERING WEAR LAYER AND FINISHING COATS DECK COVERING WATERPROOF MEMBRANE 26GA. SHEET METAL FLASHING 2" SLAB ON GRADE SAW CUT REGLET DK-01 FRY REGLET H8 DRIP CAP MINI RAIL SYSTEM PER WALL ASSEMBLY VAPROSHIM PER PLANS WD-01 MT-01 2% SLOPE CO-02 PLYWOOD PER STRUCTURAL INSULATION PER PLANS DENSGLASS SHEATHING PER PLANS TERMINATE CONCRETE WALL INSIDE WOOD FRAMED WALL PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:02:49 PM 2308 DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.7 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1/2" = 1'-0"9BENCH & PLANTER DETAIL 1" = 1'-0"13BENCH SECTION 1" = 1'-0"15PLANTER SECTION 3" = 1'-0"16DECK HIDDEN FASTENER DETAIL 3" = 1'-0"6DETAIL AT TERRACE PARAPET 3" = 1'-0"5DETAILS AT SHARP ANGLE BETWEEN KEBONY AND CONCRETE WALL 3" = 1'-0"11DRAIN AT TERRACE 3" = 1'-0"10BASEMAT DETAIL 3" = 1'-0"1CONCRETE WALL EDGE AT TERRACE 3" = 1'-0"2KEBONY SILL EXTERIOR AT DECK 3" = 1'-0"7CONCRETE WALL TOP AT TERRACE 1 1/2" = 1'-0"4AXON FOR PHYSICAL MOCK UP OF KEBONY AND TILE EDGE 3" = 1'-0"3PIVOT DOOR MIDDLE JAMB 3" = 1'-0"17STAIR 02 DETAIL 01 3" = 1'-0"12STAIR 02 DETAIL 02 3" = 1'-0"14STAIR 02 AT GRADE No.Description Date 3" = 1'-0"8CONCRETE AND WOOD WALL INTERSECTION VAPOUR BARRIER CONNECTION STRIP RF-01 FOAM GASKET WINDOW PER SCHEDULE PLYWOOD PER STRUCTURAL RF-01 INSULATION PER PLANS PLYWOOD PER STRUCTURAL HOT-AIR WELD FRAMING PER STRUCTURAL 2X8" WOOD STUD HOT-AIR WELD WINDOW PER SCHEDULE VAPOUR BARRIER CONNECTION STRIP 2x8 WOOD STUD FOAM GASKET RF-01 IF-01 FRAMING PER STRUCTURAL PLYWOOD PER STRUCTURAL INSULATION PER PLANS 2x8 WOOD STUD ALACO LADDER MODEL 560 ROOF HATCH PER SCHEDULE INSULATION PER PLANS SARNAFIL SECUREMENT HOT-AIR WELD IF-01 RF-01 PLYWOOD PER STRUCTURAL FRAMING PER STRUCTURAL RF-01 ALACO LADDER MODEL 560 ROOF HATCH PER SCHEDULE SARNAFIL SECUREMENT HOT-AIR WELD INSULATION PER PLAN RF-01 INSULATION PER PLAN IF-01 PLYWOOD PER STRUCTURAL RF-01 PIPE PER PLUMBING SHIM AS REQUIRED DOWNSPOUT NOZZLE PER PLUMBING FRY REGLET H8 DRIP CAP PLYWOOD PER STRUCTURAL TILE FINISH PER PLANS WRB-01 WRB-02 CEMENT BACKERBOARD PER PLANS FRAMING PER STRUCTURAL INTERIOR IF-01 EXTERIOR VAPROBOND 2" 1" 1" 2" VAPROBOND DOWNSPOUT NOZZLE PER PLUMBING INTERIOREXTERIOR FRY REGLET H8 DRIP CAP PLYWOOD PER STRUCTURAL WRB-01 WD-01 MINI RAIL SYSTEM PER WALL ASSEMBLY VAPROSHIM PER PLANS 2" 1" 1" 2" PRE-FORMED RAINSCREEN VENT COR-A-VENT, ROCK WOOL OR SIM VAPROBOND VAPROBOND PIPE PER PLUMBING DOWNSPOUT NOZZLE PER PLUMBING INTERIOREXTERIOR LINK-SEAL LINK-SEAL HSS3x3x1/8" WM-01 WELDED TO STEEL ANGLE PT-02 MCMASTER-CARR HEAVY DUTY HINGE 1805A15 TI-01 CEMENTITOUS BOND WRB-02 CEMENT BACKERBOARD PER PLANS WRB-01 PLYWOOD PER STRUCTURAL STEEL PLATE MT-01 PT-02 CONCRETE WALL PER STRUCTURAL HSS3x3x1/8" PT-02 MCMASTER-CARR HEAVY DUTY HINGE 1805A15 HSS3x3x1/8" WM-01 WELDED TO STEEL ANGLE PT-02 HSS3X3X1/8" PT-02 MCMASTER-CARR SIDE-MOUNT BRACKET CASTER 87875T55 MIN. 2" HSS3x3x1/8" WM-01 WELDED TO STEEL ANGLE PT-02 CEMENTITOUS BOND WRB-02 CEMENT BACKERBOARD PER PLANS WRB-01 PLYWOOD PER STRUCTURAL TI-01 MAX. 2" HSS3x3x1/8" CONCRETE WALL PER STRUCTURAL WM-01 WELDED TO STEEL ANGLE PT-02 MAX. 2" HSS3x3x1/8" WM-01WM-01 WELDED TO STEEL ANGLE WELDED TO STEEL ANGLE PT-02 MCMASTERCARR HEAVY DUTY HINGE 1852A61 PT-02 ROOF ASSEMBLY PER PLANS HOT-AIR WELD RF-01 SARNAFIL SECUREMENT PER MANUFACTURER METAL COUNTERFLASHING ALUMINUM TAPE RF-01 MT-01 WITH WATERTIGHT JOINTS RF-01 1/4"/FT SLOPE DOOR PER SCHEDULE CO-02CO-02 CO-02CO-02 DOOR PER SCHEDULE CO-02 CO-02 CO-02 CO-02 HSS3x3x1/8" WM-01WM-01 WELDED TO STEEL ANGLE WELDED TO STEEL ANGLE PT-02 MCMASTER-CARR FACE MOUNT PADLOCABLE EYE 1183A22 PT-02 1" HSS3X3X1/8" PT-02 EQ EQ MCMASTER-CARR FACE MOUNT PADLOCABLE EYE 1183A22 PT-02 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:02:57 PM 2308 DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.8 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 1 1/2" = 1'-0"5SKYLIGHT LONGITUDINAL SECTION 1 1/2" = 1'-0"6SKYLIGHT CROSS SECTION 1 1/2" = 1'-0"7ROOF HATCH AT BLDG A 1 1/2" = 1'-0"8ROOF HATCH AT BLDG B No.Description Date 3" = 1'-0"1DOWNSPOUT NOZZLE DETAIL AT TILE WALL 3" = 1'-0"3DOWNSPOUT NOZZLE DETAIL AT KEBONY WALL 3" = 1'-0"2DOWNSPOUT NOZZLE DETAIL AT CONCRETE WALL 3" = 1'-0"14FENCE JAMB TO WALL AT BUILDING A DETAIL 3" = 1'-0"9FENCE JAMB TO WALL AT BUILDING B DETAIL 3" = 1'-0"17FENCE SILL WITH CASTER 3" = 1'-0"15LOW FENCE JAMB TO WALL AT BUILDING A DETAIL 3" = 1'-0"10LOW FENCE JAMB TO WALL AT BUILDING B DETAIL 3" = 1'-0"16LOW FENCE DOOR HINGE DETAIL 1 1/2" = 1'-0"4MECHANICAL EQUIPMENT PAD DETAIL 3" = 1'-0"13DOOR TYPE H JAMB DETAIL 3" = 1'-0"12DOOR TYPE I JAMB DETAIL 3" = 1'-0"11FENCE DOOR PADLOCK EYE DETAIL 3" = 1'-0"18FENCE DOOR WITH PADLOCK EYE SECTION DETAIL 2' - 0" 6" 1' - 3" BELOW ADJ GRADE MIN. 3" 8" , VIF 3" CLR TYP, UNO 2" CLR. 1' - 0" , VIF #4@12" OC, VERT & HORIZ, (MIN 2).VERT REINF CTR ON WALL ROUGHEN TO 1/4"AMPLITUDE #5@12" OC, T&B, EAWAY, TYP ALTERNATING HOOK 4'-KSI FTG,TYP ADJACENT PLANTER PER PLAN CAST-IN-PLACE CONCRETE BASEAND WALL CORE; REINFORCEDPER GEOTECH RECOMMENDATIONS AMENDED PLANTING MEDIUM (UNCOMPACTED) COMPACTED BACKFILL PERGEOTECH RECOMMENDATIONS (1) ADDL #4 @ TOP OF WALL SEAT WALL PER LANDSCAPE 1' - 3" 6" 1' - 0" , VIF 1' - 0" , VIF FOOTING REINF PER A/- WALL VERT & HORIZ REINF PER A/- CAST-IN-PLACE CONCRETE BASEAND WALL CORE; REINFORCEDPER GEOTECH RECOMMENDATIONS BELOW ADJ GRADE MIN. 3" FINISH SURFACE OF ADJACENT PAVING PER CIVIL DRAWINGS 3/4" CRUSHED AGGREGATE BASE GEOTEXTILE COMPACTED BACKFILL PERGEOTECH RECOMMENDATIONS NOTE:SEE 1/A8.10 FOR ADDL INFO NOT SHOWN ROUGHEN TO 1/4" AMPLITUDE TYP, UNO 2" CLR. SEAT WALL PER LANDSCAPE 2' - 7" CLR. 3" TYP, UNO 2" CLR. 1' - 6" (*) 2' - 0" (*) 4'-KSI FTG, TYP 1/2" DIA X 4 1/2" ANCHOR BOLT FINISHED GRADE 2" DIA X 5" DEEP GROUT POCKETS BY OTHERS #5@12" OC, T&B,EA WAY, TYP SHIFT REINF AS REQ'D TOAVOID CONFLICTING WITHANCHOR GROUT POCKET. #3 REBARS AT 12" O.C. MAX EACH WAY A: SECTION VIEW 1' - 5 1/8" 1' - 6" (*) 2' - 0" (*) FINISHED GRADE B: ELEVATION VIEW FLAT BOTTOM 2' - 3 5/8" NOTE:SEE A: SECTION FOR ADDL INFO NOT SHOWN NOTE: (*) BENCH DESIGNER TO CONFIRM WHETHER CURRENT FOOTING SIZE IS SUFFICIENT FOR ANCHOR DESIGN PRECAST CONCRETE BENCH PER LANDSCAPE PRECAST CONCRETE BENCH PER LANDSCAPE CLR. 3" TYP, UNO 2" CLR. 1' - 6" (*) 2' - 0" (*) 4'-KSI FTG, TYP 1/2" DIA X 4 1/2" ANCHOR BOLT FINISHED GRADE 2" DIA X 5" DEEP GROUT POCKETS BY OTHERS #5@12" OC, T&B,EA WAY, TYP SHIFT REINF AS REQ'D TOAVOID CONFLICTING WITHANCHOR GROUT POCKET. #3 REBARS AT 12" O.C. MAX EACH WAY B: SECTION VIEW 1' - 5 1/2" 1' - 6" (*) 2' - 0" (*) FINISHED GRADE A: ELEVATION VIEW FLAT BOTTOM 10 1/4" NOTE:SEE A: ELEVATION FOR ADDL INFO NOT SHOWN NOTE: (*) BENCH DESIGNER TO CONFIRM WHETHER CURRENT FOOTING SIZE IS SUFFICIENT FOR ANCHOR DESIGN 1' - 11 5/8" PRECAST CONCRETE BENCH PER LANDSCAPE PRECAST CONCRETE BENCH PER LANDSCAPE 39" TO 19 5/8" VARIES BETWEEN #3 REBARS AT 12" O.C. MAX EACH WAY 2' - 0" (*) FINISHED GRADE NOTE:SEE A : ELEVATION FOR ADDL INFO NOT SHOWN B: SECTION VIEW NOTE: (*) BENCH DESIGNER TO CONFIRM WHETHER CURRENT FOOTING SIZE IS SUFFICIENT FOR ANCHOR DESIGN 1' - 6" PRECAST CONCRETE BENCH PER LANDSCAPE A: ELEVATION VIEW #5@12" OC, T&B,EA WAY, TYP FINISHED GRADE (3) 3/4" DIA X 10"L. COIL ROD 4'-KSI FTG, TYP 1' - 6" (5) 3" DIA X 7" DEEP. GROUT POCKETS (BY OTHERS) FOOTING (BY OTHERS) CLR 3" TYP, UNO 2" CLR, 5' - 0" (*) SHIFT REINF AS REQ'D TOAVOID CONFLICTING WITHANCHOR GROUT POCKET. 8" 1' - 3" 1' - 9" PRECAST CONCRETE BENCH PER LANDSCAPE TOF = TOG PER ARCH/LANDSCAPE NOTE: 1. REFER TO ARCH/LANSCAPE FOR THE EXACT LOCATION OF THE POLE FOOTING. 2. IF THE POLE FOOTING IS TO BE CAST AGAINST EARTH INSTEAD OF USING SONOTUBE, THE CLEAR COVER AND FOOTING Ø SHALL BE 3" AND 12", RESPECTIVELY. 3. THIS IS NOT DESIGNED TO SUPPORT PEOPLE LEANING AGAINST THE BOLLARD. 2'-6" MAX 3" CLR. 2" 2" SEE NOTE #2. 1 1/2" CLR TO TIES W/ SONOTUBE. SEE NOTE #2 9" Ø #4 HOOP @ 6" OC. NWC W/ f'c = 4000 PSI (4) #4 VERT BARS EQ SPACED 2' - 0" TYP, SEE NOTE #3 BOLLARD BY LANDSCAPE MAX WEIGHT 10 LBS B HOOP PER ELEVATION VERTICAL REBAR PER ELEVATION B: SECTION 3" CLR 1 1/2" SEE NOTE #2. 1 1/2" CLR TO TIES W/ SONOTUBE. 2" 2" SEE NOTE #2 1' - 0" Ø #4 HOOP @ 6" OC. NWC W/ f'c = 4000 PSI (6) #4 VERT BARS EQ SPACED EMBEDED SCREEN WALL POST, SEE ARCH / LANDSCAPE FOR LOCATION AND SIZE TYP, UNO 4' - 0" TOF = TOG PER ARCH/LANDSCAPE NOTE: 1. REFER TO ARCH/LANSCAPE FOR THE EXACT LOCATION OF THE POLE FOOTING. 2. IF THE POLE FOOTING IS TO BE CAST AGAINST EARTH INSTEAD OF USING SONOTUBE, THE CLEAR COVER AND FOOTING Ø SHALL BE 3" AND 15", RESPECTIVELY. 6'-6" MAX POST, WIRE PANEL AND ITS ATTACHMENT BY LANDSCAPE B HOOP PER ELEVATION VERTICAL REBAR PER ELEVATION B: SECTION TOF = TOG PER ARCH/LANDSCAPE NOTE: 1. REFER TO ARCH/LANSCAPE FOR THE EXACT LOCATION OF THE POLE FOOTING. 2. IF THE POLE FOOTING IS TO BE CAST AGAINST EARTH INSTEAD OF USING SONOTUBE, THE CLEAR COVER AND FOOTING Ø SHALL BE 3" AND 12", RESPECTIVELY. 3. THIS IS NOT DESIGNED TO SUPPORT PEOPLE LEANING AGAINST THE BOLLARD. 3' MAX 3" CLR. 2" 2" SEE NOTE #2. 1 1/2" CLR TO TIES W/ SONOTUBE. SEE NOTE #2 9" Ø #4 HOOP @ 6" OC. NWC W/ f'c = 4000 PSI (4) #4 VERT BARS EQ SPACED 2' - 0" TYP, SEE NOTE #3 BOLLARD BY LANDSCAPE MAX WEIGHT 10 LBS B PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:03:02 PM 2308 LANDSCAPE FOOTING DETAILS MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A8.9 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 1 1/2" = 1'-0"1TECHO-BLOC SEAT WALL DETAIL A 1 1/2" = 1'-0"2TECHO-BLOC SEAT WALL DETAIL B 1 1/2" = 1'-0"6PRECAST CONCRETE SEAT (LARGE KERNEL) DEATIL A 1 1/2" = 1'-0"7PRECAST CONCRETE SEAT (SMALL KERNEL) 1 1/2" = 1'-0"8PRECAST CONCRETE BENCH (BOG) 1 1/2" = 1'-0"3BOLLARD POLE FOOTING DETAIL 1 1/2" = 1'-0"5WIRE FENCE POLE FOOTING DETAIL 25 No.Description Date 1 1/2" = 1'-0"4LOW FENCE FOOTING DETAIL BOARD FORMED CONCRETE NOTES: 1) FORMWORK: THE FORMING BOARDS FOR CONCRETE WALLS WILL BE MADE FROM DOUGLAS FIR, MEASURING 6 INCHES WIDE AND AT LEAST 3/4 INCH THICK. THE BOARDS ARE TO BE SANDBLASTED PRIOR TO PLACEMENT AND EDGES SHALL BE SMOOTHENED TO PREVENT SPLINTERS. THE BOARDS MUST SUPPORT WET CONCRETE WITH A MINIMUM LOAD CAPACITY OF 3000 PSI AND REMAIN STRAIGHT WITHIN A TOLERANCE OF ±1/8 INCH OVER 10 FEET. INSTALLATION REQUIRES PROPER ALIGNMENT AND SECURING WITH RUST- RESISTANT FASTENERS. 2) PATCH FORM TIE HOLES AT CONCRETE: AFTER REMOVING FORM TIES FROM THE CONCRETE WALLS, CLEAN THE SURROUNDING AREA AND FILL THE HOLES WITH A HIGH- QUALITY, CEMENT-BASED PATCHING COMPOUND. SMOOTH THE SURFACE TO MATCH THE SURROUNDING TEXTURE, AND ALLOW THE PATCH TO CURE. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:18:40 AM 2308 PROJECT SCHEDULES MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A9.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 FINISH SCHEDULE NO.NAME AREA WALL FINISH FLOOR FINISH BASE FINISH CEILING FINISH 101 MULTIPURPOSE ROOM 2270 SF IF-01 CO-01 BF-01 FC-01/GLB-01 101A MULTIPURPOSE ROOM Not Placed IF-01 CO-01 BF-01 FC-01/GLB-01 101B MULTIPURPOSE ROOM Not Placed IF-01 CO-01 BF-01 FC-01/GLB-01 102 BREAK ROOM 130 SF IF-01 CO-03 BF-01 IF-01 103 FURNITURE STORAGE 184 SF IF-01 CO-03 BF-01 IF-01 104 ADA FAMILY RESTROOM 137 SF TI-02 CO-01 BF-03 IF-01 105 TICKET BOOTH 59 SF PER PLANS CO-01 BF-01 IF-01 106 LOWER HUB 364 SF IF-01 CO-01 BF-01 IF-01 107 WORKSHOP 523 SF IF-01 CO-01 BF-01 IF-02 108 MATERIAL STORAGE 315 SF IF-01 CO-03 BF-01 IF-02 109 ELECTRICAL ROOM 61 SF IF-01 CO-03 BF-01 IF-02 110 CUSTODIAN CLOSET 72 SF IF-01 CO-03 BF-01 IF-02 111 ELEVATOR 58 SF - CO-03 112 MACHINE ROOM 54 SF IF-01 CO-03 BF-01 IF-02 113 LUNCH STORAGE 33 SF IF-01 CO-03 BF-01 IF-02 114 RESTROOM 253 SF IF-03, TI-02 CO-01 BF-03 IF-01 115 STORAGE 76 SF CO-02 CO-03 - 201 UPPER HUB 900 SF IF-01 FF-01 BF-01 IF-01 202 MEDIUM OFFICE 129 SF IF-01 CP-01 BF-02 ACT-01 203 LARGE OFFICE 217 SF IF-01 CP-01 BF-02 IF-01 204 CLOSET 37 SF IF-01 CP-01 BF-02 IF-01 205 CLOSET 37 SF IF-01 CP-01 BF-02 IF-01 206 IT ROOM 56 SF PL-01 FF-01 BF-01 IF-02 207 MEETING ROOM 170 SF IF-01 CP-01 BF-02 ACT-01 208 LARGE OFFICE 217 SF IF-01 CP-01 BF-02 IF-01 209 MEDIUM OFFICE 129 SF IF-01 CP-01 BF-02 ACT-01 210 SMALL OFFICE 100 SF IF-01 CP-01 BF-02 ACT-01 211 SMALL OFFICE 100 SF IF-01 CP-01 BF-02 ACT-01 212 SMALL OFFICE 101 SF IF-01 CP-01 BF-02 ACT-01 213 SMALL OFFICE 101 SF IF-01 CP-01 BF-02 ACT-01 214 MEDIUM OFFICE 130 SF IF-01 CP-01 BF-02 IF-01 215 BREAK ROOM 291 SF IF-01 FF-01 BF-01 IF-01 216 STORAGE 74 SF IF-01 FF-01 BF-01 IF-01 217 STAFF RESTROOM 59 SF TI-03 CO-01 BF-03 IF-01 218 SHARED OFFICE 202 SF IF-01 CP-01 BF-02 IF-01 219 CLOSET 35 SF IF-01 CP-01 BF-02 IF-01 LIGHTING FIXTURE SCHEDULE TYPE QTY DESCRIPTION MANUFACTURER CATALOG NO.LOCATION REMARKS A 33 RECESSED DOWNLIGHT USAI LIGHTING P23UF-15L2-UNV-D22-NCIC-HSG-P3RDF-15L2-35KS-S-BLACK-TRM-PFBK - A-EM 11 RECESSED DOWNLIGHT USAI LIGHTING P23UF-15L2-UNV-D22-NCIC-HSG-P3RDF-15L2-35KS-S-BLACK-TRM-PFBK - B 7 RECESSED WALL WASH USAI LIGHTING P23UF-15L2-UNV-D22-NCIC-HSG-P3RWF-15L2-35KS-D1-BLACK-TRM-PFBK HUB C 38 RECESSED DOWNLIGHT USAI LIGHTING P23UF-15L2-UNV-D22-NCIC-HSG-P3RDF-15L2-35KS-S-BLACK-TRM-PFBK EXTERIOR D 40 PENDANT LIGHT USAI LIGHTING CPRD8-15L2-35KS-F-S-BLACK-CR3-UNV-D22 OFFICE HUB D-EM 8 PENDANT LIGHT USAI LIGHTING CPRD8-15L2-35KS-F-S-BLACK-CR3-UNV-D22 OFFICE HUB F 6 SUSPENDED PENDANT FLUXWERX ILLUMINATION, INC PF1-F-D-D-35-B-04-S-F2-M-03 WORKSHOP H 13 48" DIFFUSE PLASTIC LENS ACUITY BRANDS LIGHTING CLX-L48-5000LM-SEF-FDL-MVOLT-GZ10-35K-80CRI-WH AUXILIARY ROOMS H-EM 2 48" DIFFUSE PLASTIC LENS ACUITY BRANDS LIGHTING CLX-L48-5000LM-SEF-FDL-MVOLT-GZ10-35K-80CRI-WH AUXILIARY ROOMS K 20 ACT 2X2 MARK ARCHITECTURAL LIGHTING WHSPR-LCTR-2X2-80CRI-35K-3300LM-MIN10-MVOLT-SWC-ZT OFFICE AND MEETING ROOM K3 6 WALL MOUNTED EXIT SIGN NORA NX-812-LED R C A NEXC-R K4 7 CEILING MOUNTED EXIT SIGN NORA NX-812-LED R C A NEXC-R N 10 EXTERIOR SCONCE SONNEMAN 7522.97 EXTERIOR P 3 DECORATIVE PENDANT DAVID TRUBRIDGE NAVICULA-LED-0570-NAT-LIME OFFICE HUB Q 2 DECORATIVE PENDANT DAVID TRUBRIDGE NAVICULA-LED-0900-NAT-PINK OFFICE HUB R 1 DECORATIVE PENDANT DAVID TRUBRIDGE NAVICULA-LED-1000-NAT-BLUE OFFICE HUB S 2 RECESSED LINEAR SLOT FLUXWERX ILLUMINATION, INC NN1-L-D2-B-C-35-F2-M-2'-6"ADA BATHROOM T 1 RECESSED LINEAR SLOT FLUXWERX ILLUMINATION, INC NN1-L-D2-B-C-35-F2-M-06 BATHROOM U 8 SUSPENDED RING CORONET RING-UPDN-6-35-HIGH-UNV-DB-BLK-AC-CENT-SD-SD-NA-NA-SJ-BLK MPR U-EM 8 SUSPENDED RING CORONET RING-UPDN-6-35-HIGH-UNV-DB-BLK-AC-CENT-SD-SD-NA-EMCKT-SJ-BLK MPR V 13 EXTERIOR STEP LIGHTS TARGETTI ZES-RP-FW-BT-L2-35-24+DMLE9XXX42UD-1US3166 EXTERIOR Y 1 18W SLAB 150 - PENDANT ANDLIGHT SLA-150-P-BLK-35-010-277 CONFERENCE ROOM EQUIPMENT SCHEDULE TYPE DESCRIPTION MANUFACTURER MODEL QTY REMARKS BREAK ROOM K.01 MICROWAVE SHARP R21LCFS 2 K.02 FOOD WASTE DISPOSER INSINKERATOR SS-300 1 K.03 ICE MAKER GE UCC15NPRII 1 K.04 COUNTER DEPTH REFRIGERATOR SAMSUNG RS23CB7600QLAA 2 K.05 STEEL WALL SHELVES GSW WS-W1224 2 K.06 STEEL WALL SHELVES GSW WS-W1260 2 K.07 STEEL WALL SHELVES GSW WS-W1248 5 MISCELLANEOUS MI.01 LOW VOLTAGE SHADES LUTRON 25 BLACK FASCIA COVER MI.03 PENDANT SPEAKER ATLAS SOUND PM8CX-WH 18 MI.04 EXTERIOR LOUVER 1.8 SF DAYTON 6350DS 4 POWDER COAT BLACK MI.05 LOUVER RUSKIN ELF211D 15 POWDER COAT BLACK MI.06 EXTERIOR LOUVER 1.8 SF DAYTON 6350DS 1 POWDER COAT BLACK MI.07 WALK OFF MAT BASE SPECIALTIES BASEMAT MB-400 4 36"x36" MI.08 WALK OFF MAT BASE SPECIALTIES BASEMAT MB-400 3 72"x36" MI.09 PROJECTOR 2 BY OWNER MI.10 SEMI-RECESSED FIRE EXTINGUISHER CABINET ACTIVAR CONSTRUCTION PRODUCTS GROUP 8135 7 MI.11 ROOF ACCESS HATCH LADDER ALACO LADDER CO. 560 2 MI.12 ROOF TIE-BACK ANCHOR FRONTLINE RO12-CAL 11 LOCATIONS TO BE CONFIRMED BY SOLAR CONSULTANT MI.13 LG WASHER 1 BY OWNER MI.14 LG DRYER 1 BY OWNER MI.15 COPY MACHINE 2 BY OWNER MI.16 DRINKING FOUNTAIN GRAB BAR BOBRICK 819298 2 COMPLIES WITH 7/G0.5.1 RESTROOM R.01 GRAB BAR 36"BOBRICK B-5806 X 36 3 R.02 GRAB BAR 46"BOBRICK B-5806 X 46 3 R.03 ADULT CHANGING TABLE KOALA KARE KB3000-AHL 1 R.04 BABY CHANGING STATION KOALA KARE KB300-01SS 1 R.05 SEMI RECESSED FREE NAPKIN AND TAMPON DISPENSER BOBRICK B-47064C 2 R.06 RECESSED FREE NAPKIN DISPENSER BOBRICK B-4706C 1 R.07 ELECTRONIC SOAP DISPENSER BOBRICK B-828 6 R.08 WALL MOUNTED HAND DRYER DYSON DYSON AIRBLADE V AB12 NICKEL 4 R.09 TOILET SEAT CLEANER DISPENSER HEALTH GARDS SC500DIS 9 R.10 FOLDING UTILITY SHELF KOALA KARE B-287 1 R.11 BABY CHANGING STATION RECESSED KOALA KARE KB310-SSRE 1 R.12 SANITARY NAPKIN DISPOSAL BOBRICK B-270 8 R.14 BAG HOOK KOALA KARE 310-54-KIT 11 R.15 TOILET PAPER DISPENSER WAXIE DS-3012 9 SECURITY S.01 SECURITY CAMERA 15 BY OWNER TICKET BOOTH TB.01 SAFE 1 BY OWNER TB.02 TALK THROUGH NORCON TTU-1AX 1 FINISH NOTES FINISH NAME MANUFACTURER MODEL COLOR NOTES ACT-01 ACOUSTICAL TILE CEILING ARMSTRONG 2X2 CALLA LIGHT GRAY SUPRAFINE XL 9/16" LIGHT GREY BF-01 COVE BASE JOHNSONITE COVE BASE 123 VAPOR GREY BF-02 TOELESS BASE JOHNSONITE TOELESS BASE 123 VAPOR GREY BF-03 COVE BASE FIRECLAY TILE SANITARY COVE BASE PER TILE FINISH BF-04 STAINLESS STEEL BASE SCHLUTER DBSL160EB STAINLESS STEEL TYP. AT ALL INTERIOR PLYWOOD WALLS CO-01 CONCRETE FLOOR - - - POLISHED CONCRETE 1200 GRIT CO-02 CONCRETE WALL - - - BOARD FORMED CONCRETE; 6" BOARD SIZE, SEE BOARD FORMED CONCRETE NOTE CO-03 CONCRETE FLOOR - - - CONCRETE SLAB HARD TROWELED WITH CLEAR FLOOR SEALER CP-01 CARPET TILE SHAW CONTRACT HUB MOTIVATE (57111) CT-01 QUARTZ COUNTER TOP WILSONART Q1018 LAZIO QUARTZ CT-02 STAINLESS STEEL COUNTER - - - STAINLESS STEEL; 16 GAUGE, BRUSH FINISH CT-03 BUTCHER BLOCK - - - - DK-01 DECK DEX-O-TEX WEATHERWEAR SPEEDWAY GRAY 413 DEX-O-TEX WEATHERWEAR DECKING FB-01 CUSHION FABRIC MAHARAM METAPHOR 466553–015 THERMOSPHERE MAHARAM FB-02 FABRIC MAHARAM 300073–007 HIDEOUT MAHARAM FC-01 POLYSORB CEILING PANEL POLYSORB CLOUD 1" ACOUSTICAL PANEL FF-01 LVT SHAW CONTRACT FUNCTION 5.0 TRANSITION (86501) GL-01 EXTERIOR GLAZING - - - 1" INSULATING GLASS UNIT, ¼" OUTBOARD LITE WITH LOW-E COATING (SOLARBAN 70) ON #2 SURFACE, INBOARD LITE TEMPERED GLASS (CLEAR). GL-02 INTERIOR GLAZING - - - TEMPERED CLEAR SAFETY GLAZING GL-03 INTERIOR PRIVACY GLASS - - - TEMPERED CLEAR SAFETY GLAZING WITH THE PAVIA ACID ETCH FULL BY VITRO GL-04 FRAMELESS MIRROR - - - 1/4", QUALITY Q2, CLEAR FLOAT GLASS WITH SILVER, COPPER, AND ORGANIC COATING; APPLY ALUMINIUM J CHANNEL SGS JC-5/8 BLACK AT MIRROR TOP AND BOTTOM GL-05 FIRE RATED GLAZING - - - FIRE RATED GLAZING PER SECTION 08910 IN SPEC BOOK. GLB-01 EXPOSED STRUCTURAL FRAMING - - - IF-01 INTERIOR DRYWALL FINISH - - DEHW08 CLASSIC WHITE 5/8" GYP. BOARD LEVEL 05, PT-03 U.O.N. SHEEN: EGGSHELL U.O.N IF-02 EXPOSED CEILING - - - EXPOSE STRUCTURE ABOVE IF-03 GREEN DRYWALL - - DEHW08 CLASSIC WHITE 5/8" EXTERIOR RATED GYP BOARD LEVEL 05, PT-03 U.O.N. SHEEN: EGGSHELL U.O.N MT-01 BLACK METAL SARNACLAD METAL FASTENED AT 4" OC STAGGERED AND FASTENED PER MANUFACTURER; POWDER COAT TO MATCH PT-02 MW-01 MILLWORK - - - 1/2" MARINE PLYWOOD; FINISH WITH 3 COATS SEMI-GLOSS POLYEURTHANE MW-02 WHITE CABINETRY WILSONART 1573 FROSTY WHITE WHITE LAMINATE MW-03 MILLWORK - - - 3/4" MARINE PLYWOOD; FINISH WITH 3 COATS SEMI-GLOSS POLYEURTHANE MW-04 MILLWORK - - - 1" MARINE PLYWOOD; FINISH WITH 3 COATS SEMI-GLOSS POLYEURTHANE MW-05 GRAY CABINETRY WILSONART 10657 GRAPHITE GRAY LAMINATE PL-01 FIRE RATED PLYWOOD - - - 1/2" FRT PLYWOOD PT-01 PAINT FINISH DUNN EDWARDS DE6378 JET SHEEN TBS PT-02 PAINT FINISH DUNN EDWARDS DEA002 BLACK SHEEN TBS PT-03 PAINT FINISH DUNN EDWARDS DEHW08 CLASSIC WHITE SHEEN TBS RF-01 PVC ROOFING SIKA SARNAFIL S327 REFLECTIVE GREY ESR-1157 TI-01 EXTERIOR TILE FIRECLAY BRICK TILE GREEN MOUNTAINS TI-02 INTERIOR TILE FIRECLAY BRICK TILE APPALACHIAN TI-03 INTERIOR TILE FIRECLAY - TIDEWATER WD-01 EXTERIOR WOOD FINISH KEBONY G2171 - 1X6 PASSIVE RAINSCREEN SYSTEM, CLEAR, LOW PROFILE CLIP WD-02 WOOD DECK BOARDS KEBONY 2637 & 2638 - FASTENATOR HIDDEN FASTENING SYSTEM WM-01 WIRE MESH MCNICHOLS 342088G048 - 48" x 96" PAINTED TO MATCH PT-07 3" x 3" MESH SQUARE, GALVANIZED STEEL 0.135" THICK WRB-01 SELF ADHERED VAPOR BARRIER VAPROSHEILD WRAPSHEILD SA - WRB-02 LIQUID APPLIED WATERPROOFING REDGARD TDS-104 - WATERPROOFING AND CRACK PREVENTION MEMBRANE WRB-03 ELEVATOR WATERPROOFING SIKA SIKAPROOF A+12 - WRB-04 CONCRETE PLANTER WATERPROOFING SIKA SIKALASTIC HLM 5000 GC - 25 SHADE TYPES: BO: BLACKOUT SHADES [LUNA BLACKOUT: IRON] SS: 3% SHADES [M SCREEN: WHITE/PEARL] SHADE SCHEDULE DOOR/WINDOW/STOREFRONT TYPE SHADE NUMBER DESCRIPTION MANUFACTURER WIDTH HEIGHT SHADE CLOTH MATERIAL REMARKS DOORS 101C-H 1.1.2 LOW VOLTAGE SHADES LUTRON 8' - 10 3/4" 8' - 0" BO BLACK FASCIA COVER DOORS 101C-H 1.1.2 LOW VOLTAGE SHADES LUTRON 8' - 10 3/4" 8' - 0" BO BLACK FASCIA COVER DOORS 101I-N 1.1.1 LOW VOLTAGE SHADES LUTRON 8' - 11 1/4" 8' - 0" BO BLACK FASCIA COVER DOORS 101I-N 1.1.1 LOW VOLTAGE SHADES LUTRON 8' - 10 1/2" 8' - 0" BO BLACK FASCIA COVER STOREFRONT S1011 1.1.3 LOW VOLTAGE SHADES LUTRON 5' - 2 3/8" 12' - 0" BO BLACK FASCIA COVER STOREFRONT S1011 1.1.4 LOW VOLTAGE SHADES LUTRON 11' - 4 1/2" 12' - 0" BO BLACK FASCIA COVER STOREFRONT S1012 1.1.6 LOW VOLTAGE SHADES LUTRON 6' - 0" 12' - 0" BO BLACK FASCIA COVER STOREFRONT S1012 1.1.5 LOW VOLTAGE SHADES LUTRON 5' - 4 1/4" 12' - 0" BO BLACK FASCIA COVER STOREFRONT S1012 1.1.5 LOW VOLTAGE SHADES LUTRON 5' - 3 1/4" 12' - 0" BO BLACK FASCIA COVER WINDOW 2012 1.1.3 LOW VOLTAGE SHADES LUTRON 2' - 0" 5' - 0" SS BLACK FASCIA COVER WINDOW 2021 & 2022 & 2023 1.1.4 LOW VOLTAGE SHADES LUTRON 6' - 0" 4' - 0" SS BLACK FASCIA COVER WINDOW 2031 & 2032 1.1.5 LOW VOLTAGE SHADES LUTRON 5' - 0" 7' - 6" SS BLACK FASCIA COVER WINDOW 2034 1.1.6 LOW VOLTAGE SHADES LUTRON 6' - 0" 9' - 0" SS BLACK FASCIA COVER WINDOW 2081 1.1.7 LOW VOLTAGE SHADES LUTRON 4' - 6" 3' - 0" SS BLACK FASCIA COVER WINDOW 2082 & 2084 1.1.8 LOW VOLTAGE SHADES LUTRON 5' - 11" 9' - 0" SS BLACK FASCIA COVER WINDOW 2091 & 2092 1.1.9 LOW VOLTAGE SHADES LUTRON 4' - 0" 5' - 0" SS BLACK FASCIA COVER WINDOW 2101 1.1.10 LOW VOLTAGE SHADES LUTRON 3' - 0" 8' - 0" SS BLACK FASCIA COVER WINDOW 2111 & 2112 1.2.1 LOW VOLTAGE SHADES LUTRON 4' - 0" 6' - 0" SS BLACK FASCIA COVER WINDOW 2121 1.2.2 LOW VOLTAGE SHADES LUTRON 2' - 4" 7' - 6" SS BLACK FASCIA COVER WINDOW 2132 1.2.3 LOW VOLTAGE SHADES LUTRON 2' - 2 5/8"7' - 6" SS BLACK FASCIA COVER WINDOW 2141 & 2142 1.2.4 LOW VOLTAGE SHADES LUTRON 6' - 0" 4' - 0" SS BLACK FASCIA COVER WINDOW 2143 1.2.5 LOW VOLTAGE SHADES LUTRON 4' - 6" 3' - 0" SS BLACK FASCIA COVER WINDOW 2183 1.2.6 LOW VOLTAGE SHADES LUTRON 4' - 0" 6' - 0" SS BLACK FASCIA COVER WINDOW 2184 1.1.1 LOW VOLTAGE SHADES LUTRON 3' - 0" 4' - 6" SS BLACK FASCIA COVER WINDOWS 2185 & 2186 1.1.2 LOW VOLTAGE SHADES LUTRON 7' - 6" 5' - 0" SS BLACK FASCIA COVER No.Description Date 3 PC01 CORRECTIONS 03/28/25 6 PC SUBMITTAL 03 04/28/25 6 6 22 A8.4 21 A8.4 29 A8.4 TB.02 5 A8.8 6 A8.8 6 A8.3 2031 2032 2033 24 A8.4 26 A8.4 12 A8.4 28 A8.4 11 A8.4 12 A8.4 28 A8.4 24 A8.4 26 A8.4 2021 2022 2023 2 A8.5 27 A8.4 20922091 6 A8.3 24 A8.4 27 A8.4 26 A8.4 12 A8.4 28 A8.4 11 A8.4 2185 2186 6 A8.3 24 A8.4 27 A8.4 12 A8.4 28 A8.4 11 A8.4 26 A8.4 12 A8.4 28 A8.4 11 A8.4 17 A8.4 23 A8.4 16 A8.4 2082 2084 2083 6 A8.3 26 A8.4 24 A8.4 12 A8.4 28 A8.4 28 A8.4 11 A8.4 12 A8.4 2101 2102 27 A8.4 24 A8.4 24 A8.4 28 A8.4 28 A8.4 11 A8.4 2111 2112 2113 2 A8.5 24 A8.4 24 A8.4 27 A8.4 28 A8.4 28 A8.4 11 A8.4 2121 2122 2132 2131 1 A8.5 28 A8.4 11 A8.4 11 A8.4 28 A8.4 24 A8.4 19 A8.4 18 A8.4 27 A8.4 30 A8.4 21422141 6 A8.3 24 A8.4 12 A8.4 27 A8.4 11 A8.4 28 A8.4 26 A8.4 21822181 2183 6 A8.3 27 A8.4 24 A8.4 12 A8.4 28 A8.4 28 A8.4 28 A8.4 11 A8.4 27 A8.4 24 A8.4 26 A8.4 18 A8.4 19 A8.4 1 A8.5 GLASS TYPES GL-01 INSULATING GLASS UNIT 1" INSULATING GLASS UNIT, ¼" OUTBOARD LITE WITH LOW-E COATING (SOLARBAN 70) ON #2 SURFACE, INBOARD LITE TEMPERED GLASS (CLEAR). GL-02 GLAZING TEMPERED CLEAR SAFETY GLAZING GL-03 FROSTED GLASS TEMPERED CLEAR SAFETY GLAZING WITH THE PAVIA ACID ETCH FULL BY VITRO GL-04 FRAMELESS MIRROR 1/4", QUALITY Q2, CLEAR FLOAT GLASS WITH SILVER, COPPER, AND ORGANIC COATING; EDGES: UNIFORMLY GROUND AND POLISHED. APPLY MASTIC TO BACK OF MIRROR "PATS" SPACED 4 PATS/SQ. FT.; ADJUST MIRROR SO THAT IT IS PLUMB AND IN PLACE TO AVOID DISTORTION OF REFLECTING IMAGES. ALLOW 1/8" SPACE BETWEEN BACK OF MIRROR AND WALL SURFACE. APPLY ALUMINIUM J CHANNEL SGS JC-5/8 BLACK AT MIRROR TOP AND BOTTOM; SECURELY CLIP TO SUBSTRATE USING NON-CORROSIVE ANCHORS. AT DRYWALL BACK-UP, ANCHORS MUST BE SECURED TO STUDS OR STEEL WALLPLATE SPANNING FROM STUD TO STUD. GL-05 FIRE RATED GLAZING FIRE RATED GLAZING PER SECTION 08910 IN SPEC BOOK. GL-06 OVERHEAD DOOR FROSTED GLASS 1/2" INSULATING GLASS UNIT, FROSTED GLASS/SATIN ETCHED FINISH PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:03:46 PM 2308 WINDOW SCHEDULES MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 A9.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 WINDOW SCHEDULE NO. TYPE QTY. WIDTH HEIGHT SILL HT. MANUFACTURER MODEL OPERATION GLASS FINISH. REMARKS 1051 D 1 4' - 0" 6' - 0" 3' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2011 A 1 4' - 0" 6' - 0" 13' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2012 A 1 2' - 0" 5' - 0" 4' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2021 B 1 2' - 0" 4' - 0" 3' - 0" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2022 B 1 2' - 0" 4' - 0" 3' - 0" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2023 B 1 2' - 0" 4' - 0" 3' - 0" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2031 A 1 3' - 0" 7' - 6" 4' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2032 B 1 2' - 0" 5' - 0" 4' - 0" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2033 A 1 2' - 0" 2' - 6" 9' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2034 A 1 6' - 0" 9' - 0" 2' - 6" ALUFLAM AW50 FIXED GL-06 DARK BRONZE PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' ; 60 MINUTE FIRE RATED 2081 A 1 4' - 6" 3' - 0" 11' - 0" ALUFLAM AW50 FIXED GL-06 DARK BRONZE PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' ; 60 MINUTE FIRE RATED 2082 A 1 3' - 5" 9' - 0" 4' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2083 A 1 2' - 6" 4' - 0" 9' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2084 B 1 2' - 6" 5' - 0" 4' - 0" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2091 A 1 1' - 4" 5' - 0" 3' - 6" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2092 B 1 2' - 8" 5' - 0" 3' - 6" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2101 B 1 3' - 0" 5' - 4" 3' - 6" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2102 A 1 3' - 0" 2' - 8" 0' - 10" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2111 B 1 2' - 0" 5' - 0" 3' - 6" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2112 B 1 2' - 0" 5' - 0" 3' - 6" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2113 A 1 4' - 0" 1' - 0" 2' - 6" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2121 B 1 2' - 4 1/8" 4' - 5" 3' - 6" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2122 A 1 2' - 4 1/8" 3' - 1" 0' - 5" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2131 C 1 2' - 2 5/8" 2' - 9" 5' - 2" ARCADIA INC T-200 AWNING GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2132 A 1 2' - 2 5/8" 4' - 9" 0' - 5" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2141 B 1 2' - 6" 4' - 0" 5' - 0" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2142 A 1 3' - 6" 4' - 0" 5' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2143 A 1 4' - 6" 3' - 0" 6' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2151 A 1 3' - 0" 4' - 6" 3' - 9" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2181 A 1 1' - 4" 4' - 0" 5' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2182 B 1 2' - 8" 4' - 0" 5' - 0" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2183 A 1 4' - 0" 2' - 0" 3' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2184 A 1 3' - 0" 4' - 6" 5' - 0" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2185 A 1 5' - 0" 5' - 0" 3' - 6" ARCADIA INC T-200 FIXED GL-01 BLACK AB-8 PROVIDE COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 2186 B 1 2' - 6" 5' - 0" 3' - 6" ARCADIA INC T-200 CASEMENT GL-01 BLACK AB-8 PROVIDE ARCADIA WINDOW SCREEN AND COLLIDESCAPE 'SPIDERWEB CLEAR STICK-ON SCREENING' 3001 E 1 6' - 0" 3' - 0" VELUX FCM FIXED GL-01 BLACK 1" = 1'-0"2WINDOW TYPE D 1" = 1'-0"4WINDOW TYPE E 3/4" = 1'-0"10WINDOW CLUSTER 203 3/4" = 1'-0"6WINDOW CLUSTER 202 3/4" = 1'-0"7WINDOW CLUSTER 209 3/4" = 1'-0"15WINDOW CLUSTER 218-1 25 1" = 1'-0"1WINDOW TYPE A 3/4" = 1'-0"13WINDOW CLUSTER 208 3/4" = 1'-0"11WINDOW CLUSTER 210 3/4" = 1'-0"14WINDOW CLUSTER 211 3/4" = 1'-0"8WINDOW CLUSTER 212-213 3/4" = 1'-0"12WINDOW CLUSTER 214 3/4" = 1'-0"9WINDOW CLUSTER 218-2 1" = 1'-0"3WINDOW TYPE B 1" = 1'-0"5WINDOW TYPE C No.Description Date 4 FIRE MASTER PLAN SUBMITTAL 03 01/29/25 NOTE: WINDOW SUBCONTRACTOR TO FIELD MEASURE WINDOWS AFTER THE INSTALLATION OF SUPERBLOCKING. 14 A8.3 9 A8.3 14 A8.3 9 A8.3 15 A8.3 10 A8.3 9 A8.3 14 A8.3 9 A8.3 15 A8.3 10 A8.3 25 A8.4 7 A8.3 8 A8.3 1 A8.3 3 A8.7 12 A8.3 11 A8.3 1 A8.3 13 A8.3 20 A8.4 8 A8.3 8 A8.417 A8.3 22 A8.3 28 A8.3 30 A8.3 29 A8.3 16 A8.3 21 A8.3 13 A8.8 13 A8.4 4 A7.3 2 A8.3 11 A8.3 3 A8.3 20 A8.4 1 A8.3 12 A8.8 3 A7.3 14 A8.3 10 A8.3 14 A8.3 4 A8.3 4 A8.314 A8.3 14 A8.3 10 A8.3 4 A8.3 4 A8.3 5 A8.3 20 A8.3 5 A8.3 8 A8.8 7 A8.8 23 A8.6 GLASS TYPES GL-01 INSULATING GLASS UNIT 1" INSULATING GLASS UNIT, ¼" OUTBOARD LITE WITH LOW-E COATING (SOLARBAN 70) ON #2 SURFACE, INBOARD LITE TEMPERED GLASS (CLEAR). GL-02 GLAZING TEMPERED CLEAR SAFETY GLAZING GL-03 FROSTED GLASS TEMPERED CLEAR SAFETY GLAZING WITH THE PAVIA ACID ETCH FULL BY VITRO GL-04 FRAMELESS MIRROR 1/4", QUALITY Q2, CLEAR FLOAT GLASS WITH SILVER, COPPER, AND ORGANIC COATING; EDGES: UNIFORMLY GROUND AND POLISHED. APPLY MASTIC TO BACK OF MIRROR "PATS" SPACED 4 PATS/SQ. FT.; ADJUST MIRROR SO THAT IT IS PLUMB AND IN PLACE TO AVOID DISTORTION OF REFLECTING IMAGES. ALLOW 1/8" SPACE BETWEEN BACK OF MIRROR AND WALL SURFACE. APPLY ALUMINIUM J CHANNEL SGS JC-5/8 BLACK AT MIRROR TOP AND BOTTOM; SECURELY CLIP TO SUBSTRATE USING NON-CORROSIVE ANCHORS. AT DRYWALL BACK-UP, ANCHORS MUST BE SECURED TO STUDS OR STEEL WALLPLATE SPANNING FROM STUD TO STUD. GL-05 FIRE RATED GLAZING FIRE RATED GLAZING PER SECTION 08910 IN SPEC BOOK. GL-06 OVERHEAD DOOR FROSTED GLASS 1/2" INSULATING GLASS UNIT, FROSTED GLASS/SATIN ETCHED FINISH PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 5/9/2025 9:19:02 AM 2308 DOOR AND GATE SCHEDULES MAY 09, 2025 PLAN CHECK SUBMITTAL 03 A9.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MAY 09, 2025 1/2" = 1'-0"4DOOR TYPE D 1/2" = 1'-0"5DOOR TYPE E 1/2" = 1'-0"3DOOR TYPE C 1/2" = 1'-0"2DOOR TYPE B 1/2" = 1'-0"6DOOR TYPE F 1/2" = 1'-0"10DOOR TYPE J 1/2" = 1'-0"1DOOR TYPE A 1/2" = 1'-0"11DOOR TYPE K 1/2" = 1'-0"7DOOR TYPE G 1/2" = 1'-0"8DOOR TYPE H DOOR SCHEDULE NO. DESCRIPTION TYPE WIDTH HEIGHT THK. FRAME MAT. FRAME TYPE FINISH GLAZING HRDWR. GROUP MODEL MANUFACTURER REMARKS 101A STOREFRONT DOOR A 6' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM DARK BRONZE GL-06 19 AW50 ALUFLAM ELECTRIFIED CARD READER ACCESS; 45 MINUTE FIRE RATED DOOR; PANIC HARDWARE 101B STOREFRONT DOOR B 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 16 MS362 ARCADIA ELECTRIFIED CARD READER ACCESS; PANIC HARDWARE 101C STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101D STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101E STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101F STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101G STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101H STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101I STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101J STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101K STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101L STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101M STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101N STOREFRONT DOOR C 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 14 NS212 ARCADIA CENTER PIVOT 101O STOREFRONT DOOR B 3' - 0" 8' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 16 MS362 ARCADIA ELECTRIFIED CARD READER ACCESS; PANIC HARDWARE 101P STOREFRONT DOOR A 6' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 18 MS362 ARCADIA ELECTRIFIED CARD READER ACCESS; PANIC HARDWARE 101Q OPERABLE PARTITION O 35' - 7 3/8" 12' - 0"FB-02 11 842 MODERCO 102A HOLLOW METAL DOOR E 3' - 0" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 03 45 MINUTE FIRE RATED DOOR 102B EXTERIOR HOLLOW METAL DOOR E 3' - 0" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 07 103A HOLLOW METAL DOUBLE DOOR D 6' - 0" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 05 45 MINUTE FIRE RATED DOOR 104A EXTERIOR HOLLOW METAL DOOR E 3' - 0" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 06 106A STOREFRONT DOOR B 3' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 15 MS362 ARCADIA ELECTRIFIED CARD READER ACCESS 106B STOREFRONT DOOR B 3' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 15 MS362 ARCADIA ELECTRIFIED CARD READER ACCESS 107A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-03 13 CRL 107B OVERHEAD SECTIONAL DOOR J 12' - 0" 10' - 0" 0' - 1 3/4" ALUMINUM BRONZE ANODIZED GL-06 10 521 OVERHEAD DOOR CORPORATION 107C STOREFRONT DOOR A 6' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM BLACK AB-8 GL-01 17 MS362 ARCADIA ELECTRIFIED CARD READER ACCESS 108A HOLLOW METAL DOOR E 3' - 0" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 03 108B OVERHEAD DOOR UTILITY K 8' - 0" 8' - 0" 0' - 0" STEEL STEEL BRONZE ANODIZED 10 600 OVERHEAD DOOR CORPORATION 108C HOLLOW METAL DOUBLE DOOR D 6' - 0" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 05 45 MINUTE FIRE RATED DOOR 109A EXTERIOR HOLLOW METAL DOOR G 8' - 0" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 08 45 MINUTE FIRE RATED DOOR W/ LOUVERS 110A HOLLOW METAL DOOR E 2' - 10" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 03 112A EXTERIOR HOLLOW METAL DOOR H 3' - 0" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 07 W/ LOUVERS 113A EXTERIOR HOLLOW METAL DOOR D 8' - 0" 7' - 0" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 09 114A HOLLOW METAL DOOR E 2' - 0" 6' - 8" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 01 114B HOLLOW METAL DOOR E 2' - 0" 6' - 8" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 01 114C HOLLOW METAL DOOR E 2' - 0" 6' - 8" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 01 114D HOLLOW METAL DOOR E 2' - 0" 6' - 8" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 01 114E HOLLOW METAL DOOR E 2' - 0" 6' - 8" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 01 114F HOLLOW METAL DOOR E 2' - 0" 6' - 8" 0' - 1 3/4" HM HM PAINTED TO MATCH PT-02 01 202A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 203A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 204A SOLID WOOD VENEER DOOR I 3' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM ALUMINUM 03 205A SOLID WOOD VENEER DOOR I 3' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM ALUMINUM 03 206A SOLID WOOD VENEER DOOR I 3' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM ALUMINUM 04 207A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 208A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 209A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 210A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 211A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 212A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 213A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 214A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING BRUSHED STAINLESS GL-04 13 DR4SBS12P CRL 215A STOREFRONT DOOR B 3' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM ALUMINUM BLACK AB-8 GL-01 15 MS362 ARCADIA 216A SOLID WOOD VENEER DOOR I 3' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM ALUMINUM 03 217A SOLID WOOD VENEER DOOR I 3' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM ALUMINUM 02 218A GLASS WALL DOOR F 3' - 0" 7' - 0" 0' - 0" N/A PATCH FITTING SATIN ANODIZED GL-04 13 DR4SBS12P CRL 219A SOLID WOOD VENEER DOOR I 3' - 0" 7' - 0" 0' - 1 3/4" ALUMINUM ALUMINUM 03 301A ROOF HATCH L 3' - 0" 1' - 0" GALVANNEALED STEEL GALVANNEALED STEEL 12 S BILCO 301B ROOF HATCH L 3' - 0" 1' - 0" GALVANNEALED STEEL GALVANNEALED STEEL S BILCO GATE SCHEDULE NO. DESCRIPTION TYPE WIDTH HEIGHT THK. FRAME MAT. FRAME TYPE FINISH GLAZING SHADE TYPE HRDWR. GROUP MODEL MANUFACTURER REMARKS 101Q OPERABLE PARTITION O 35' - 7 3/8" 12' - 0"FB-02 11 842 MODERCO 115A DOUBLE MESH GATE M 6' - 0" 3' - 0" STEEL STEEL PAINTED TO MATCH PT-03 SEE A6.14 115B DOUBLE MESH GATE M 6' - 0" 3' - 0" STEEL STEEL PAINTED TO MATCH PT-03 SEE A6.14 302D METAL GATE N STEEL STEEL PAINTED TO MATCH PT-03 SEE A6.14 302E METAL GATE N STEEL STEEL PAINTED TO MATCH PT-03 SEE A6.14 1/2" = 1'-0"9DOOR TYPE I 1/2" = 1'-0"12DOOR TYPE L 25 1/4" = 1'-0"13DOOR TYPE O No.Description Date 4 FIRE MASTER PLAN SUBMITTAL 03 01/29/25 6 PC SUBMITTAL 03 04/28/25 NOTE: FOR GATE TYPES 'M' AND 'N', PLEASE SEE SHEET A6.14 HAND-ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED BETWEEN 34" AND 44" ABOVE THE FLOOR. 6 AB ANCHOR BOLT ACI AMERICAN CONCRETE INSTITUTE ADDL ADDITIONAL ADJ ADJACENT AESS ARCHITECTURAL EXPOSED STRUCTURAL STEEL AGGR AGGREGATE AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION ALT ALTERNATE ALUM ALUMINUM ANCH ANCHOR ANSI AMERICAN NATIONAL STANDARDS INSTITUTE APA AMERICAN PLYWOOD ASSOCIATION APPVD APPROVED APPROX APPROXIMATE ARCH ARCHITECTURAL; ARCHITECT ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS AWPA AMERICAN WOOD PRESERVERS ASSOCIATION AWS AMERICAN WELDING SOCIETY AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION ASTM AMERICAN SOCIETY FOR TESTING MATERIALS &AND @ AT BLDG BUILDING BLK BLOCK BLKG BLOCKING BM BEAM BN BOUNDARY NAIL BNDRY BOUNDARY BOT OR B BOTTOM BRC BRACE BRG BEARING BT BENT BTWN BETWEEN CANT CANTILEVER CAM OR C CAMBER CC CENTER TO CENTER CG CENTER OF GRAVITY CIP CAST-IN-PLACE CJ CONSTRUCTION JOINT; CONTROL JOINT CL CENTER LINE CLR CLEARANCE; CLEAR CMU CONCRETE MASONRY UNIT COL COLUMN COMP COMPRESSION CONC CONCRETE CONN CONNECTION; CONNECT CONSTR CONSTRUCTION CONT CONTINUE; CONTINUOUS CONTR CONTRACTOR CJP COMPLETE JOINT PENETRATION WELD CTR CENTER CTSK COUNTERSINK; COUNTERSUNK CU FT CUBIC FOOT d PENNY (NAIL OR BAR DIA) DBL DOUBLE DEPT DEPARTMENT DET DETAIL DF DOUGLAS FIR/LARCH DIA OR ø DIAMETER DIAG DIAGONAL DIAPH DIAPHRAGM DIM DIMENSION DN DOWN DO DITTO (REPEAT) DWG DRAWING DWL DOWEL EA EACH EF EACH FACE EJ EXPANSION JOINT EL ELEVATION ELEC ELECTRICAL ELEV ELEVATOR EMBED EMBEDMENT EN EDGE NAIL ENGR ENGINEER EQ EQUAL OR EQUIVALENT EQUIP EQUIPMENT ES EACH SIDE ETC ET CETERA EW EACH WAY EXIST or (E) EXISTING EXT EXTERIOR FDN FOUNDATION FF FAR FACE FF FINISHED FLOOR FIN FINISH FJ FLOOR JOIST FL FLOOR LINE FLG FLANGE FLR FLOOR FN FIELD NAIL FOC FACE OF CONCRETE FOM FACE OF MASONARY FOS FACE OF STUD FOW FACE OF WALL FP FULL PENETRATION; FIRE PROOFING FRMG FRAMING FS FULL SIZE; FAR SIDE FT FOOT; FEET FTG FOOTING GA GAUGE GALV GALVANIZED GB GRADE BEAM GLB GLUED LAMINATED BEAM GR GRADE GRND GROUND H or HORIZ HORIZONTAL HDR HEADER HGR HANGER HOSP HOSPITAL HP HIGH POINT HS HIGH STRENGTH HSH HT HEIGHT HR HARD ROCK ID INSIDE DIAMETER IF INSIDE FACE I-JST I-JOIST IN INCH INCL INCLUDE INFO INFORMATION INSP INSPECTION INT INTERIOR JST JOIST JT JOINT K KIPS KSI KIPS PER SQUARE INCH LAB LABORATORY LB(S) OR # POUND(S) LF LINEAL FOOT LIN LINEAL; LINEAR LLBB LONG LEGS BACK-TO-BACK LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LP LOW POINT LSL LONG SLOTTED HOLES LT WT LIGHTWEIGHT LVL LEVEL MAS MASONRY MATL MATERIAL MAX MAXIMUM MB MACHINE BOLT MC MISCELLANEOUS CHANNEL SHAPE MECH MECHANICAL MFR MANUFACTURER MIN MINIMUM; MINUTE MISC MISCELLANEOUS (N)NEW N NORTH NF NEAR FACE NIC NOT IN CONTRACT NORM NORMAL NO or # NUMBER NS NEAR SIDE NTS NOT TO SCALE OC ON CENTER OD OUTSIDE DIAMETER OF OUTSIDE FACE OH OPPOSITE HAND OPNG OPENING OPP OPPOSITE ORIG ORIGINAL OSB ORIENTED STRAND BOARD PARA OR // PARALLEL PC PRECAST; PIECE PERP PERPINDICULAR PI PLYWOOD INDEX PL PLATE PROPERTY LINE PLF POUNDS PER LINEAL FOOT PLCS PLACES- PLY PLYWOOD PROP PROPERTY PT POST TENSIONED PW PLATE WASHER PJP PARTIAL JOINT PENETRATION WELD PREFAB PREFABRICATED PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PVC POLYVINYL CHLORIDE PVMT PAVEMENT # POUND; NUMBER REF REFERENCE REINF REINFORCE; REINFORCING REQD REQUIRED RF ROOF Ø DIAMETER SCHED SCHEDULE SECT SECTION SEP SEPERATION SHT SHEET SHTG SHEATHING SIM SIMILAR SLBB SHORT LEGS BACK-TO-BACK SOG SLAB ON GRADE SPCG SPACING SPECS SPECIFICATIONS SPCL SPECIAL SQ SQUARE SS SELECT STRUCTURAL SSL SHORT SLOTTED HOLES STAGG STAGGER STD STANDARD STIFF STIFFENERS STIRR STIRRUP STL STEEL STRUCT STRUCTURAL STRUCT I STRUCTURAL I SW SHEAR WALL SYM SYMMETRICAL TB TIE BEAM T & B TOP AND BOTTOM T & G TONGUE & GROOVE TOC TOP OF CURB; TOP OF CONCRETE TOF TOP OF FOOTING TEMP TEMPERATURE; TEMPORARY THRU THROUGH THK THICKNESS/THICK THR THREADED TOP or T TOP TOS TOP OF STEEL/TOP OF SLAB TOW TOP OF WALL TSG TAPERED STEEL GIRDER TYP TYPICAL UBC UNIFORM BUILDING CODE UNO UNLESS NOTED OTHERWISE UT ULTRA-SONIC TEST VERT VERTICAL VSH VERTICAL SLOTTED HOLES W/WITH W/O WITHOUT WD WOOD WP WORK POINT; WATERPROOF WT WEIGHT WWF WELDED WIRE FABRIC STRUCTURAL STEEL SHAPES Wx W SHAPE Cx AMERICAN STD CHANNEL SHAPE MC MISC CHANNEL SHAPE Lx ANGLE SHAPE WT, ST, MT STRUCT TEE SHAPE PIPE STANDARD PIPE SHAPE PIPE-X EXTRA STRONG PIPE SHAPE PIPE-XX DBL EXTRA STRONG PIPE SHAPE HSS STRUCT TUBING SHAPE ABBREVIATIONS HORIZONTALLY SLOTTED HOLES PL SYMBOLS SECTION REFERENCE BUBBLE DETAIL REFERENCE BUBBLE WITH ARROW DETAIL REFERENCE BUBBLE FULL HEIGHT SECTION INDICATOR BUILDING SECTION INDICATOR ELEVATION OF WALL OR FRAME NORTH ARROW SLOPE EARTH LAYER STEPPED SURFACE; FLOOR DEPRESSION SLOPED SURFACE INDICATES SAND OR GROUT INDICATES GRAVEL WELDED WIRE FABRIC (WWF LAYER) STEEL TUBE COLUMN STEEL PIPE COLUMN WIDE FLANGE STEEL COLUMN MEMBER SPLICE STEEL IN CROSS SECTION DIRECTION OF SPAN X SX.X X SX.X X SX.X X SX.X X SX.X X SX.X X SX.X N SHEET INDEX PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/ 1 2 / 2 0 2 5 1 2 : 0 3 : 1 9 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . rv t 2308 SHEET INDEX, SYMBOLS AND ABBREVIATIONS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S0.01 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SHEET NO. SHEET NAME S0.01 SHEET INDEX, SYMBOLS AND ABBREVIATIONS S0.02 GENERAL NOTES S0.03 GENERAL NOTES S1.00 SITE PLAN S1.01A FOUNDATION FRAMING PLAN - BUILDING A S1.01B FOUNDATION FRAMING PLAN - BUILDING B S1.02A ROOF FRAMING PLAN - BUILDING A S1.02B LEVEL 2 CMD + STEEL FRAMING PLAN - BUILDING B S1.03B LEVEL 2 WOOD FRAMING PLAN - BUILDING B S1.04B ROOF FRAMING PLAN - BUILDING B S2.01 BUILDING B ELEVATION S5.01 TYPICAL CONCRETE DETAILS S5.02 TYPICAL CONCRETE DETAILS S5.03 TYPICAL CONCRETE DETAILS S5.11 CONCRETE SHEAR WALL DETAILS S6.01 TYPICAL WOOD DETAILS S6.02 TYPICAL WOOD DETAILS S6.03 TYPICAL WOOD DETAILS S6.04 TYPICAL WOOD DETAILS S6.05 WOOD SHEAR WALL DETAILS S6.06 WOOD SHEAR WALL DETAILS S6.10 WOODSTAIR DETAILS S6.21 TJI DETAILS S6.22 TJI-SHEAR WALL TRANSFER DETAILS S6.30 ENLARGED ELEVATOR SECTIONS AND DETAILS S7.01 TYPICAL STEEL DETAILS S7.02 TYPICAL STEEL DETAILS S7.11 TYPICAL METAL DECK DETAILS S7.12 TYPICAL METAL DECK DETAILS Total: 29 No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 3 3 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 STRUCTURAL NOTES FOUNDATION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. FOUNDATION DESIGN IS BASED ON THE GEOTECHNICAL INVESTIGATION REPORT BY ASSOCIATED SOILS ENGINEER, INC. FOOTINGS ARE DESIGNED BASED ON THE FOLLOWING INFORMATION: ALLOWABLE NET BEARING = 3000 PSF (2500 PSF MAX) PASSIVE EARTH PRESSURE = 200 PSF/FT (2000 PSF MAX) COEFFICIENT OF FRICTION = 0.35 MODULUS OF SUBGRADE REACTION = 100 PCI ALLOWABLE BEARING AND PASSIVE PRESSURE VALUES MAY BE INCREASED BY 1/3 FOR WIND AND SEISMIC WHEN ALTERNATIVE BASIC LOAD COMBINATIONS ARE USED. ALLOWABLE BEARING MAY BE INCREASED BY 1/3 FOR WIND AND SEISMIC. MINIMUM DEPTH OF FOOTING BELOW LOWEST ADJACENT FINAL GRADE SHALL BE 1'-6". MINIMUM WIDTH OF FOOTING SHALL BE 2'-0" FOR ISOLATED FOOTINGS AND 1'-3" FOR CONTINUOUS FOOTINGS. ALLOWABLE BEARING PRESSURE MAY BE INCREASED 300 PSF PER EACH ADDITIONAL FOOT OF DEPTH AND 100 PSF PER EACH ADDITIONAL FOOT OF WIDTH TO A MAX VALUE OF 3000 PSF. FRICTIONAL RESISTANCE AND PASSIVE RESISTANCE MAY BE COMBINED PROVIDED THE PASSIVE IS REDUCED BY ONE-THIRD. TO DETERMINE COMPOSITE LATERAL RESISTANCE, WHICH MAY BE INCREASED BY 1/3 UNDER SHORT TERM, TRANSIENT WIND/SEISMIC LOADING. FOR ANY NEW FOOTINGS THAT ARE WITHIN A LATERAL DISTANCE FROM ANY EXISTING BUILDING FOOTING EQUAL TO THE DEPTH OF THE NEW FOOTING (D), THE FOLLOWING TABULATED REDUCTION FACTORS SHOULD BE APPLIED TO THE CORRESPONDING ALLOWABLE SOILS BEARING CAPACITY VALUES. CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING, SHEATHING AND SHORING REQUIRED AND SHALL BE SOLELY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING LAGGING, SHORING AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREETS AND UTILITIES IN ACCORDANCE WITH ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. EXCAVATION FOR FOOTINGS SHALL BE APPROVED BY THE INSPECTOR AND SOILS ENGINEER PRIOR TO PLACING THE CONCRETE AND REINFORCING. CONTRACTOR TO NOTIFY THE INSPECTOR WHEN INSPECTION OF EXCAVATION IS READY. INSPECTOR TO SUBMIT LETTER OF COMPLIANCE. ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL BEHIND RETAINING WALLS BEFORE CONCRETE OR GROUT HAS ATTAINED FULL DESIGN STRENGTH. CONTRACTORS SHALL BRACE OR PROTECT ALL BUILDING AND PIT WALLS BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHING FLOORS ARE COMPLETELY IN PLACE AND HAVE ATTAINED FULL STRENGTH. CONTRACTOR SHALL PROVIDE FOR DESIGN, PERMITS AND INSTALLATION OF SUCH BRACING. FOUNDATIONS SHALL BE PLACED AND ESTIMATED ACCORDING TO DEPTHS SHOWN ON DRAWINGS. SHOULD SOIL ENCOUNTERED AT THESE DEPTHS NOT BE APPROVED BY THE INSPECTOR OR SOILS ENGINEER, FOUNDATION ELEVATIONS/DIMENSIONS MAY NEED TO BE MODIFIED BY THE ENGINEER. FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN BUILDING AREA SHALL BE MECHANICALLY COMPACTED IN LAYERS IN ACCORDANCE WITH THE SOILS REPORT AND APPROVED BY THE SOILS ENGINEER. FLOODING WILL NOT BE PERMITTED. ALL FILLS USED TO SUPPORT FOUNDATIONS SHALL BE INSPECTED BY THE SOILS ENGINEER REPRESENTATIVE PER CODE SECTION 1704.7. ALL ABANDONED FOOTINGS, UTILITIES, ETC. SHALL BE REMOVED UNLESS NOTED OTHERWISE. NEW FOOTINGS MUST EXTEND INTO UNDISTURBED SOILS OR FOUNDED ON STRUCTURALLY CERTIFIED FILL PER THE SOILS REPORT. SLABS ON GRADE SHALL BE SUPPORTED ON UNDISTURBED NATURAL EARTH MATERIALS OR PROPERLY CONTROLLED FILL MATERIALS AS PER THE RECOMMENDATIONS OF THE SOILS REPORT. REINFORCING STEEL 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF CHAPTER 19 OF THE CODE, ASTM A615, GRADE 60 UNO. DEFORMATIONS SHALL BE IN ACCORDANCE WITH ASTM A-305. BARS SHALL BE CLEAN OF RUST, GREASE, OR OTHER MATERIALS LIKELY TO IMPAIR BOND. ALL REINFORCING BAR BENDS SHALL BE MADE COLD. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A-185. PROVIDE LAPS AS PER ACI 318-14 SECTION 25.5, 8" MINIMUM. WWF SHALL BE SUPPORTED ON APPROVED CHAIRS. REINFORCING BAR SPLICES SHALL BE MADE AS INDICATED ON THE DRAWINGS. MINIMUM SPLICE LENGTH FOR REINFORCING STEEL BARS IN MASONRY SHALL BE 48 BAR DIAMETERS, 24" MINIMUM. MINIMUM SPLICE LENGTH FOR REINFORCING STEEL BARS IN CONCRETE SHALL BE PER ACI 318. LAP ALL HORIZONTAL BARS AT CORNERS AND INTERSECTIONS. ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN THE FINAL IN-PLACE INSPECTION IS MADE. WHERE WELDING OF REINFORCING IS APPROVED BY THE STRUCTURAL ENGINEER, IT SHALL BE DONE BY AWS CERTIFIED WELDERS USING E90XX OR APPROVED ELECTRODES. WELDING PROCEDURES SHALL CONFORM TO THE REQUIREMENTS OF STRUCTURAL WELDING CODE- REINFORCING STEEL", AWS-D1.4, LATEST REVISION. REINFORCING BARS TO BE WELDED SHALL CONFORM TO THE REQUIREMENTS OF ASTM A-706. BARS IN SLABS SHALL BE SECURELY SUPPORTED ON WELL-CURED CONCRETE BLOCKS OR APPROVED METAL CHAIRS, PRIOR TO PLACING CONCRETE. REINFORCING STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE "ACI MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES", LATEST EDITION. COMPLETE AND DETAILED REINFORCING PLACEMENT DRAWINGS SHALL BE PREPARED AND SUBMITTED TO THE ARCHITECT FOR REVIEW BY THE STRUCTURAL ENGINEER PRIOR TO FABRICATION IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE CODES. THESE DRAWINGS SHALL BE AVAILABLE ON THE JOB SITE PRIOR TO PLACING OF CONCRETE. MILL TEST REPORTS FOR GRADE 60 BARS SHALL BE SUBMITTED PRIOR TO PLACEMENT OF CONCRETE. CONTINUOUS INSPECTION OF CONCRETE SHALL INCLUDE INSPECTION DURING INSTALLATION OF REINFORCING STEEL. INSPECTION SHALL BE SCHEDULED SO THAT PLACEMENT OF REINFORCING STEEL, CONDUIT, SLEEVES, AND EMBEDDED ITEMS MAY BE CORRECTED PRIOR TO PLACEMENT OF OVERLYING GRIDS OR REINFORCING STEEL. ALL GRADE 60 REINFORCING STEEL SHALL BE CLEARLY MARKED TO DIFFERENTIATE THEM FROM GRADE 40 REINFORCING STEEL IF CONCURRENTLY ON SITE. CONCRETE PROTECTION FOR REINFORCEMENT THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE MINIMUM PROVIDED FOR REINFORCEMENT: COVER, IN. A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3 B, CONCRETE EXPOSED TO EARTH OR WEATHER: NO. 6 THROUGH NO. 18 BAR 2 NO 5 BAR, W31 OR D31 WIRE & SMALLER 1 1/2 C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND: SLABS, WALLS, JOISTS: NO. 14 AND NO. 18 BAR 1 1/2 NO. 11 BAR & SMALLER 3/4 BEAMS, COLUMNS: PRIMARY REINFORCEMENT TIES, STIRRUPS, SPIRALS 1 1/2 ALL CONCRETE CONSTRUCTION SHALL CONFORM WITH CHAPTER 19 OF THE CODE AND WITH THE PROVISIONS OF ACI 318-19. REINFORCED CONCRETE WAS DESIGNED BY THE "ULTIMATE STRENGTH DESIGN METHOD". CONCRETE MIXES SHALL BE DESIGNED BY AN APPROVED TESTING LABORATORY AND REVIEWED BY THE STRUCTURAL ENGINEER. THE COMPRESSIVE STRENGTH AND DURABILITY OF THE CONCRETE SHALL BE PROPORTIONED BASED ACI 318-19 AND CBC CHAPTER 19. SCHEDULE OF STRUCTURAL CONCRETE 28-DAY STRENGTH AND TYPES (UNO): PORTLAND CEMENT SHALL CONFORM TO ASTM C-150, TYPE II/V. AGGREGATE FOR HARDROCK CONCRETE SHALL CONFORM TO ALL REQUIREMENTS AND TESTS OF ASTM C-33 AND PROJECT SPECIFICATIONS. EXCEPTIONS MAY BE USED ONLY WITH PERMISSION OF THE STRUCTURAL ENGINEER. AGGREGATE FOR LIGHT WEIGHT (110PCF) CONCRETE SHALL BE EXPANDED CONFORMING TO ASTM C330 AND PROJECT SPECIFICATIONS. EXCEPTIONS MAY BE USED ONLY WITH PERMISSION OF THE STRUCTURAL ENGINEER. CONCRETE MIXING OPERATION, ETC. SHALL CONFORM TO ASTM C-94. PLACEMENT OF CONCRETE SHALL CONFORM TO CODE SECTION 1905 AND PROJECT SPECIFICATIONS. CLEAN AND ROUGHEN TO 1/4" AMPLITUDE ALL CONCRETE SURFACES AGAINST WHICH NEW CONCRETE IS TO BE PLACED. ALL REINFORCING BARS, ANCHOR BOLTS AND OTHER CONCRETE INSERTS SHALL BE WELL SECURED IN POSITION PRIOR TO PLACING CONCRETE. PROVIDE SLEEVES FOR PLUMBING AND ELECTRICAL OPENINGS IN CONCRETE BEFORE PLACING. DO NOT CUT ANY REINFORCING WHICH MAY CONFLICT. CORING IN CONCRETE IS NOT PERMITTED. NOTIFY THE STRUCTURAL ENGINEER IN ADVANCE OF CONDITIONS NOT SHOWN ON THE DRAWINGS. SEE THESE DRAWINGS FOR ADDITIONAL RESTRICTIONS ON THE PLACEMENT OF OPENINGS IN SLABS AND WALLS. PIPES LARGER THAN 1-1/2" DIAMETER SHALL NOT BE EMBEDDED IN STRUCTURAL CONCRETE EXCEPT WHERE SPECIFICALLY APPROVED BY STRUCTURAL ENGINEER. PIPES SHALL NOT DISPLACE OR INTERRUPT REINFORCING BARS, SPACE EMBEDDED PIPES AND SLEEVES AT A MINIMUM OF 3 DIAMETERS. CONCRETE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. MIN MAX MAX MAX MAX LOCATION IN STRUCTURE STRENGTH DENSITY SLUMP WATER/CEMENT AGGREGATE (PSI) (PCF) (IN) RATIO SIZE (IN) ALL CONCRETE FOOTINGS 5000 145 4 0.5 1 SLAB ON GRADE, CURBS 4000 145 4 0.5 3/4 LWC FILLED METAL DECK 4000 115 4 0.45 3/4 CONCRETE SHEAR WALL 5000 145 4 0.5 1 FLOOR AND ROOF LIVE LOADS: ROOF 20 PSF (REDUCIBLE) CLASSROOM AREA 50 PSF SNOW LOADS: SNOW LOADS ARE IN ACCORDANCE WITH SECTION 1608 OF THE CODE. GROUND SNOW LOAD, Pg = ZERO WIND LOADS: WIND LOADS ARE IN ACCORDANCE WITH SECTION 1609 OF THE CBC AND ASCE 7-16. BASIC WIND SPEED, V = 95 MPH (3-SECOND GUST) WIND EXPOSURE C WIND RISK CATEGORY = II BUILDING HEIGHT < 60 FT ENCLOSED BUILDING, GCpi = +/- 0.18 EARTHQUAKE LOADS ON PRIMARY STRUCTURE: EARTHQUAKE LOADS ARE IN ACCORDANCE WITH SECTION 1613 OF THE CBC AND ASCE 7-16. SEISMIC LOADING IS PER THE EQUIVALENT LATERAL FORCE PROCEDURE IN ACCORDANCE WITH ASCE 7-16 SECTION 12.8. LOCATION: 34.18618 LAT, -118.58325 LON SS = 1.284g S1 = 0.458g Fa = 1.0 Fv = 1.842 SMS = 1.284g SM1 = 0.844g SDS = 0.856g SD1 = 0.562g RISK CATEGORY II SITE CLASS D SEISMIC DESIGN CATEGORY D SPECIAL RC SHEAR WALL le = 1.0 R = 5 Ωo = 2.5 Cd = 5 rho = 1.3 WOOD SHEAR WALL le = 1.0 R = 6.5 Ωo = 3 Cd = 4 rho = 1.3 DESIGN 1. 2. 3. 4. 5.EARTHQUAKE LOADS ON NON-STRUCTURAL COMPONENTS: EARTHQUAKE LOADS ARE IN ACCORDANCE WITH SECTION 1613 OF THE CODE. Ip = 1.0 FOR ALL NONSTRUCTURAL COMPONENTS EARTHQUAKE LOADS ON NONSTRUCTURAL COMPONENTS, SHALL BE DETERMINED IN ACCORDANCE WITH THE FOLLOWING PROCEDURE: CALCULATE Fp BASED ON ASCE 7-16 EQUATION 13.3-1 THE MAXIMUM AND MINIMUM VALUES FOR Fp SHALL BE DETERMINED FROM ASCE 7-16 EQUATIONS 13.3-2 AND 13.3-3, RESPECTIVELY. ALL EARTHQUAKE LOADS ON NONSTRUCTURAL COMPONENTS SHALL BE BASED ON THE VALUES OF ap AND Rp FROM ASCE 7-16 TABLES 13.5-1 AND 13.6-1. PER THE GEOTECHNICAL INVESTIGATION REPORT THE PROJECT IS LOCATED WITHIN A LIQUEFACTION HAZARD ZONE. IT IS NOT WITHIN A STATE OF CALIFORNIA ALQUIST PRIOLO EARTHQUAKE FAULT ZONE. STRUCTURAL STEEL 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED BY AN APPROVED AND LICENSED FABRICATOR IN ACCORDANCE WITH THE AISC SPECIFICATION FOR DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS (LATEST EDITION), AND WITH CHAPTER 22 OF THE CODE. ALL STRUCTURAL STEEL SHALL CONFORM WITH THE ASTM DESIGNATION AS INDICATED BELOW (UNO): WF SHAPES, WT SHAPES A992 OR A572, GRADE 50 (MULTI CERT) PLATES, CONNECTION PLATES,A-36, UNO AND MISC, UNO. PIPE COLUMNS A-53, GRADE B TUBE SECTIONS A-500, GRADE B BOLTS A-325 / A-490, AS NOTED ON DWGS ANCHOR BOLTS IN CONCRETE/MASONRY F-1554, GRADE 36 ANGLES, CHANNELS A-36 THE STRUCTURAL STEEL FABRICATOR SHALL FURNISH SHOP DRAWINGS TO THE ARCHITECT OF ALL STEEL FOR ARCHITECTS AND STRUCTURAL ENGINEERS TO REVIEW AND APPROVAL BEFORE FABRICATION. BOLT HOLES USED IN STEEL SHALL BE 1/16" LARGER IN DIAMETER THAN NORMAL SIZE OF BOLT USED, EXCEPT AS NOTED. ALL STRUCTURAL STEEL SURFACES THAT ARE ENCASED IN CONCRETE, OR MASONRY, SPRAY ON FIREPROOFING, OR ARE ENCASED BY BUILDING FINISH, SHALL BE LEFT UNPAINTED. ALL WELDING IS TO BE DONE BY CERTIFIED WELDERS USING E70XX ELECTRODES (UNO). ALL WELDS SHALL BE IN CONFORMITY WITH THE PROJECTS SPECIFICATIONS AND FOR THE CODE FOR WELDING IN BUILDING CONSTRUCTION (AWS D1.1 LATEST REVISION) OF THE AMERICAN WELDING SOCIETY. SEE SPECIAL INSPECTIONS SECTION FOR WELDING INSPECTION REQUIREMENTS. WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED. WHERE FILLET WELD SYMBOL IS GIVEN WITHOUT INDICATION OF SIZE, USE MINIMUM SIZE WELDS AS SPECIFIED IN AISC MANUAL OF STEEL CONSTRUCTION 15TH EDITION, SECTION J2.4. ALL STRUCTURAL STEEL AND MISCELLANEOUS METAL EXPOSED TO THE WEATHER SHALL BE HOT DIP GALVANIZED AFTER FABRICATION, UNLESS NOTED OTHERWISE ON THE CONSTRUCTION DOCUMENTS. REFER TO ARCH DRAWINGS FOR STEEL FINISH. PROTECT FIELD WELDS EXPOSED TO THE WEATHER SHALL RECEIVE PRIME AND PAINT OR BRUSH / COLD GALVANIZING. FOR EXPOSED STRUCTURAL STEEL CALLED OUT TO RECEIVE COATINGS SEE SPECIFICATION 05 1200 SECTION 2.03J, ITEM 4 FOR PREPARATION AND PRIMING.FOR EXPOSED, GALVANIZED MISCELLANEOUS METAL CALLED OUT TO RECEIVE COATINGS, SEE SPECIFICATION 09 9600 SECTION 2.5 FOR PREPARATION AND PRIMING. THE USE OF E70T-4 WELDING WIRE IS NOT PERMITTED. ALL WELD FILLER MATERIAL SPECIFIED AS "NOTCH TOUGH" SHALL HAVE A MINIMUM CHARPY-V NOTCH (CVN) VALUE OF 20 FT-LBS AT A TEMPERATURE OF -20° F. 100% UT TEST FOR ALL COMPLETE PENETRATION GROOVE WELDS. DISCONTINUITIES IN WELD CREATED BY ERRORS OR BY FABRICATION OR ERECTION OPERATIONS, SUCH AS TACK WELDS, ERECTION AIDS, AIR ARC GOUGING AND FLAME CUTTING, SHALL BE REPAIRED AS REQUIRED BY THE ENGINEER OF RECORD. WRITTEN WELDING PROCEDURE SPECIFICATIONS (WPS) PER THE RECOMMENDATIONS OF THE AMERICAN WELDING SOCIETY (AWS) SHALL BE DEVELOPED BY THE FABRICATOR/ERECTOR AND SUBMITTED FOR REVIEW TO THE ENGINEER PRIOR TO ANY WELDING OF THE STRUCTURAL STEEL. THE WELDING PROCEDURES SHALL INCLUDE ALL THE WELDED JOINTS AND CONFIGURATIONS TO BE USED ON THIS PROJECT-ONLY WPS WHICH ARE RELEVANT TO THIS PROJECT SHALL BE SUBMITTED, ALL WELDED JOINTS SHALL BE PRE-QUALIFIED PER AWS OR BE QUALIFIED BY TEST PER AWS. A PROCEDURE QUALIFICATION RECORD (PQR) SHALL BE INCLUDED WITH THE WPS IF THE WELDING PROCEDURE OR JOINT IS QUALIFIED BY TESTING. THE ELECTRODE MANUFACTURER AND PRODUCT/TRADE NAME SHALL BE IDENTIFIED IN THE WPS IN ADDITION TO THE AWS ELECTRODE CLASSIFICATION NAME. A COPY OF THE ELECTRODE MANUFACTURER'S TECHNICAL DATA SHEETS WITH THE RECOMMENDED WELDING PARAMETERS SHALL BE SUBMITTED WITH THE WPS. POWER DRIVEN FASTENERS / SHOT PINS 1. 2. 3. 4. 5. 6. 7. ALL POWDER DRIVEN FASTENERS SHALL CONSIST OF HILTI 0.157 DIAM XU (ICC ESR-2269) LOW VELOCITY POWDER DRIVEN FASTENERS. INSTALLATION OF ANCHORS SHALL BE IN CONFORMANCE WITH THE ICC REPORT AND MANUFACTURER RECOMMENDATIONS. WHEN INSTALLING POWDER DRIVEN FASTENERS IN NON-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE REINFORCING BARS. THE SPECIAL INSPECTOR MUST BE ON THE JOBSITE CONTINUOUSLY DURING ANCHOR INSTALLATION TO VERIFY ANCHOR TYPE, ANCHOR DIMENSIONS, CONCRETE TYPE, CONCRETE COMPRESSIVE STRENGTH, ANCHOR SPACING, EDGE DISTANCES, SLAB THICKNESS AND ANCHOR EMBEDMENT. POWDER DRIVEN FASTENERS ARE NOT PERMITTED FOR USE ON CONCRETE CURBS. FASTENERS MAY BE USED FOR SHEAR LOADS AND THEY MAY BE USED IN TENSION TO SUPPORT LOADS LESS THAN 100 POUNDS FOR MINOR LOADS LIKE ACOUSTICAL CEILINGS, DUCT WORK, CONDUIT, ETC. THE ALLOWABLE LOADS SHALL BE 100 POUNDS OR 80% OF ICC EVALUATION REPORT APPROVED VALUES, WHICHEVER IS LESS. QUALIFICATION FOR USE OF ALL POWER ACTUATED TOOLS MUST MEET ANSI A10.3 STANDARD AS REQUIRED BY THE MANUFACTURER AND ALL OSHA REQUIREMENTS. TESTING - THE OPERATOR, TOOL AND FASTENER SHALL BE PRE-QUALIFIED BY THE PROJECT INSPECTOR. THE INSPECTOR SHALL OBSERVE THE TESTING OF THE FIRST 10 FASTENER INSTALLATIONS. A TEST "PULL-OUT" LOAD OF NOT LESS THAN TWICE THE DESIGN LOAD SHALL BE APPLIED TO THE PIN IN SUCH A MANNER AS NOT TO RESIST THE SPALLING TENDENCY OF THE CONCRETE SURROUNDING THE PIN. THEREAFTER RANDOM TESTS UNDER THE PROJECT INSPECTOR'S SUPERVISION SHALL BE MADE OF APPROXIMATELY 1 IN 10 PINS. IF ANY PIN FAILS TESTING, TEST ALL PINS OF THE SAME CATEGORY NOT PREVIOUSLY TESTED UNTIL TWENTY (20) CONSECUTIVE PASS, THEN RESUME THE INITIAL TESTING FREQUENCY. WELDED THREADED AND HEADED STUDS 1. 2. 3. WELDED STUDS SHALL BE "TRUE-WELD STUDS", DIVISION OF TRU-FIT SCREW CORPORATION, CLEVELAND, OHIO OR "NELSON STUD" OHIO, OR APPROVED EQUAL. WELDED STUDS SHALL BE AUTOMATICALLY END WELDED IN SHOP OR FIELD WITH EQUIPMENT RECOMMENDED BY MANUFACTURER OF STUDS. WELDED STUD MATERIAL, WELDING AND INSPECTION, SHALL BE IN ACCORDANCE WITH THE AWS "STRUCTURAL WELDING CODE", AWS D1.1, SECTION 7. CONSTRUCTION JOINTS 1. 2. 3. ALL CONSTRUCTION JOINTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH CODE SECTION 1906 AND THE TYPICAL CONSTRUCTION JOINT DETAILS SHOWN ON THE STRUCTURAL DRAWINGS. ALL SURFACES OF CONSTRUCTION JOINTS SHALL BE CLEANED TO REMOVE DUST, CHIPS OR OTHER FOREIGN MATTER PRIOR TO PLACING THE ADJACENT CONCRETE. THE CONTRACTOR SHALL SUBMIT THE PROPOSED LOCATIONS OF CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER FOR REVIEW BEFORE STARTING CONSTRUCTION. GENERAL 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES. ALL DRAWINGS ARE CONSIDERED TO BE A PART OF THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO START OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE OWNER OR ARCHITECT. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE FOLLOWING: 2022 CALIFORNIA BUILDING CODE, VOLUME 2, REFERRED TO HERE AS "THE CODE", AND ANY OTHER REGULATING AGENCIES WHICH HAVE AUTHORITY OVER WHICH ANY PORTION OF THE WORK, INCLUDING THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY, AND THOSE CODES & STANDARDS LISTED IN THESE NOTES AND SPECIFICATIONS. SEE ARCHITECTURAL DRAWINGS FOR THE FOLLOWING: a. SIZE AND LOCATION OF ALL DOOR AND WINDOW OPENINGS, EXCEPT AS NOTED b. SIZE AND LOCATION OF ALL INTERIOR AND EXTERIOR NON-BEARING PARTITIONS. c. SIZE AND LOCATION OF ALL CONCRETE CURBS, EQUIPMENT PADS, PITS, FLOOR DRAINS, SLOPES, DEPRESSED AREAS, CHANGE IN LEVEL, CHAMFERS, GROOVES, INSERTS, ETC. d. SIZE AND LOCATION OF ALL FLOOR AND ROOF OPENINGS EXCEPT AS SHOWN. e. FLOOR AND ROOF FINISHES. f. DIMENSIONS NOT SHOWN ON STRUCTURAL DRAWINGS. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR THE FOLLOWING: a. PIPE RUNS, SLEEVES, HANGERS, TRENCHES, WALL AND SLAB OPENINGS, ETC., EXCEPT AS SHOWN OR NOTED. b. ELECTRICAL CONDUIT RUNS, BOXES, OUTLETS IN WALLS AND SLABS. c. CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL OR PLUMBING FIXTURES. d. SIZE AND LOCATION OF MACHINE OR EQUIPMENT BASES, ANCHOR BOLTS FOR MOTOR MOUNTS. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS. OPENINGS, POCKETS, ETC., LARGER THAN 6" SHALL NOT BE PLACED IN CONCRETE SLABS, DECKS, WALLS, UNLESS SPECIALLY DETAILED ON THE STRUCTURAL DRAWINGS. NOTIFY THE STRUCTURAL ENGINEER WHEN DRAWINGS BY OTHERS SHOW OPENINGS, POCKETS, ETC., LARGER THAN 6" NOT SHOWN ON THE STRUCTURAL DRAWINGS, BUT WHICH ARE LOCATED IN STRUCTURAL MEMBERS. FOR ANY FURTHER RESTRICTIONS ON OPENINGS IN STRUCTURAL ELEMENTS, SEE APPLICABLE SECTIONS BELOW. PIPES LARGER THAN 1-1/2" DIAMETER SHALL NOT BE EMBEDDED IN STRUCTURAL CONCRETE EXCEPT WHERE SPECIFICALLY APPROVED. ASTM SPECIFICATIONS ON THE DRAWINGS SHALL BE OF THE LATEST REVISION. CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK OPERATIONS FOR FILLED EXCAVATIONS OR BURIED STRUCTURES, SUCH AS CESSPOOLS, CISTERNS, FOUNDATIONS, ETC. IF ANY SUCH STRUCTURES ARE FOUND, STRUCTURAL ENGINEER SHALL BE NOTIFIED IMMEDIATELY. CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED ROOF OR FLOOR. LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH. 1. FABRICATE AND INSTALL STEEL DECK ACCORDING TO THE FOLLOWING PROVISIONS: A. ROOF DECK: ANSI/SDI RD-2017, "STANDARDS FOR STEEL ROOF DECK." B. COMPOSITE FLOOR DECK: ANSI/SDI C-2017, "STANDARDS FOR COMPOSITE STEEL FLOOR DECK-SLAB." C. WELDING OF STEEL DECK: AWS D1.3, "STRUCTURAL WELDING CODE - SHEET STEEL." 2. STEEL ROOF DECK: PROVIDE AND INSTALL ROOF AS NOTED ON THE DRAWINGS MINIMUM PROPERTIES ARE AS FOLLOWS: DECK PROFILE AND GAGE I (IN4) +S(IN3) -S(IN3) HSB-36 x 18 GA DECK 0.306 0.314 0.331 HSB-36 x 16 GA DECK 0.381 0.399 0.410 PLN-24 x 18 GA DECK 1.369 0.652 0.753 PLN-24 x 16 GA DECK 1.706 0.837 0.914 3. COMPOSITE FLOOR DECK: PROVIDE AND INSTALL ROOF AS NOTED ON THE DRAWINGS MINIMUM PROPERTIES ARE AS FOLLOWS: DECK PROFILE AND GAGE I (IN4) +S(IN3) -S(IN3) 3" x 18GA DECK 1.213 0.752 0.768 3" x 16GA DECK 1.516 0.968 0.966 2" x 18GA DECK 0.564 0.471 0.481 1 1/2" x 18GA DECK 0.381 0.399 0.410 4. DESIGN OF ALL STEEL DECK SHALL BE IN ACCORDANCE WITH SECTION 2210 OF THE CODE. 5. ALL STEEL DECK CLOSURES AND FLASHING SHALL CONFORM TO ASTM A653 GR 33, FY 33,000 PSI MIN. 6. ACCEPTABLE STEEL DECK MANUFACTURERS ARE AS FOLLOWS: VERCO MANUFACTURING IAPMO REPORT ER-2018 ASC PROFILE IAPMO REPORT ER-0161 & ER-0329 7. EXAMINE SUPPORTING FRAME AND FIELD CONDITIONS FOR COMPLIANCE WITH REQUIREMENTS FOR INSTALLATION TOLERANCES AND OTHER CONDITIONS AFFECTING PERFORMANCE. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. A. RUN UNITS CONTINUOUS OVER THREE OR MORE SPANS. B. PROVIDE 2" MINIMUM DECK BEARING AT ALL SUPPORTS. 8. INSTALL DECK PANELS AND ACCESSORIES ACCORDING TO ANSI/SDI STANDARDS AND MANUFACTURER'S WRITTEN INSTRUCTIONS. 9. INSTALL TEMPORARY SHORING BEFORE PLACING DECK PANELS AS REQUIRED TO MEET DEFLECTION LIMITATIONS. ALL SHORING OF STEEL DECK SHALL BE PER MANUFACTURER'S RECOMMENDATIONS. 10. ALL WELDING OF STEEL DECK SHALL BE DONE BY CERTIFIED LIGHT GAGE WELDERS IN ACCORDANCE WITH AWS "STRUCTURAL WELDING CODE - SHEET STEEL", AWS D1.3, LATEST EDITION. 11. UNITS SHALL BE FASTENED TO THE STEEL SUPPORTS AT THE END OF THE UNITS AND INTERMEDIATE SUPPORTS AND TO THE STEEL SUPPORTS AT THE SIDE BOUNDARIES BY 1/2" PUDDLE WELDS AT 12" OC. SHEAR STUDS WELDED THROUGH DECK MAY BE USED IN PLACE OF 1/2" DIAMETER PUDDLE WELDS. 12. SIDE LAPS OF ADJACENT UNITS SHALL BE FASTENED BETWEEN SUPPORTS BY BUTTON PUNCHING AT 12" OC MAX OR PER SPACING INDICATED IN DECK SCHEDULE, WHICHEVER IS LESS. CONTRACTOR MAY DECREASE SPACING OF SIDE LAP ATTACHMENTS TO ACCOMMODATE CONSTRUCTION LOADING AS REQUIRED. 13. PROVIDE FLASHING AND CLOSURE PLATES AT ENDS OF ALL UNITS, AROUND COLUMNS, AND AT ALL PERIMETER LOCATIONS REQUIRING CONCRETE. 14. ALL METAL DECK TO BE GALVANIZED. 15. PROVIDE PERFORATIONS OR SLOTS (1.5% MAXIMUM OPEN AREA) IN ALL ROOF AND FLOOR DECKING EXCEPT AT LOCATION WHERE THE DECKING IS PROVIDING PROTECTION FROM RAIN WATER OR WHERE NOTED ON THE DRAWINGS. STEEL DECK LATERAL DISTANCE BETWEEN NEW FOOTING AND EXISTING BUILDING FOOTING EXPRESSED IN FRACTION OF THE NEW FOOTING DEPTH, D REDUCTION FACTOR TO ALLOWABLE SOILS BEARING CAPACITY a 1.0 0.75 0.5 ≥ 1D 1/2D 0 a. INTERPOLATION MAY BE USED FOR DERIVING REDUCTION FACTOR FOR OTHER DISTANCE VALUE. 3 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/ 1 2 / 2 0 2 5 1 2 : 0 3 : 1 9 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . r v t 2308 GENERAL NOTES FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S0.02 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB No.Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 1. COMPLY WITH THE REQUIREMENTS IN CHAPTER 23 OF THE CODE AND AF&PA'S WCD 1, "DETAILS FOR CONVENTIONAL WOOD FRAME CONSTRUCTION," UNLESS OTHERWISE INDICATED. 2. NOT USED. 3. DIMENSIONAL LUMBER FRAMING: A. SPECIES, GRADE, AND MOISTURE CONTENT NOTED BELOW: 4. GLUE-LAMINATED LUMBER: A. THE FABRICATION OF STRUCTURAL GLUE-LAMINATED TIMBER SHALL COMPLY WITH THE REQUIREMENTS OF THE NATIONAL DESIGN SPECIFICATION (NDS), LATEST EDITION, AS MODIFIED BY DIV III, CHAPTER 23 OF THE CODE. ALL FABRICATION AND WORKMANSHIP SHALL BE IN CONFORMANCE WITH THE CURRENT EDITION OF THE "STANDARD SPECIFICATIONS FOR STRUCTURAL GLUE-LAMINATED DOUGLAS FIR (COAST REGION) LUMBER" BY THE WEST COAST LUMBERMAN'S ASSOCATION, AND THE CURRENT EDITION OF "TIMBER CONSTRUCTION STANDARDS" BY THE AMERICAN INSTITUTE OF TIMBER CONSTRUCTION (A.I.T.C.). B. ALL GLUE-LAMINATED MEMBERS SHALL BE DOUGLAS FIR 24F-V8. ALLOWABLE STRESS REQUIREMENTS ARE AS FOLLOWS: Fbxx = 2400 PSI TENSION IN TENSION ZONE = 2400 PSI TENSION IN COMPRESSION ZONE COMPRESSION, Fcxx = 650 PSI SHEAR, Fvxx = 190 PSI Exx = 1.8x106 PSI C. THE MANUFACTURER SHALL SUBMIT COMPLETE SHOP DRAWINGS TO THE ARCHITECT/ENGINEER FOR APPROVAL PRIOR TO ANY FABRICATION. D. PROVIDE CAMBERS AS NOTED ON THE DRAWINGS. E. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND INFORMATION. 5. FASTENERS: A. WHERE ROUGH CARPENTRY IS EXPOSED TO WEATHER, IN GROUND CONTACT, PRESERVATIVE TREATED, FIRE RETARDANT TREATED, OR IN AREA OF HIGH RELATIVE HUMIDITY, PROVIDE FASTENERS WITH HOT-DIP ZINC COATING COMPLYING WITH ASTM A 153. B. NAILS: ASTM F1667, COMMON TYPE. 6. WOOD CONNECTORS: A. PROVIDED BASIS OF DESIGN HANGERS, STRAPS, TIES, HOLD DOWNS, ETC, AS INDICATED ON THE DRAWINGS. B. WHERE CONNECTORS ARE IN EXPOSED, EXTERIOR APPLICATIONS OR IN CONTACT WITH PRESERVATIVE TREATED LUMBER, PROVIDE HOT-DIP GALVANIZED OR STAINLESS STEEL CONNECTORS. 7. ALL LUMBER IN 2 HOUR FIRE RATED WALLS AND 3 HOUR FIRE SEPARATION WALLS SHALL USE FIRE RETARDANT TREATED WOOD PER CBC SECTION 2303.2. SEE ARCHITECTURAL DRAWINGS FOR FIRE RATED WALL LOCATIONS AND DETAILS. 8. WHERE POSTS OR MULTIPLE STUDS UNDER BEAMS OR HEADERS ARE CALLED FOR ON DRAWINGS THOSE POSTS OR MULTIPLE STUDS SHALL BE CARRIED TO THE FOUNDATION/PODIUM LEVEL U.N.O. 9. JOIST BLOCKING AND BRIDGING: A. PROVIDE FULL DEPTH SOLID BLOCKING BETWEEN JOISTS OVER SUPPORT AND BELOW PARTITION WALLS. B. PROVIDE FULL DEPTH BRIDGING AT 8'-0" O.C. MAX, NOT MORE THAN 8'-0" FROM SUPPORT. 10. PROVIDE DOUBLE JOISTS UNDER NON-BEARING WALLS RUNNING PARALLEL TO JOISTS. 11. PROVIDE REQUIRED FIRE STOPPING, BACKING FOR INTERIOR FINISHES, NONBEARING WALLS, AND OTHER NON- STRUCTURAL FRAMING THAT ARE NOT SHOWN ON STRUCTURAL DRAWINGS. 12. ALL STRUCTURAL PLYWOOD SHEATHING SHALL BE DOUGLAS FIR STANDARD GRADE STRUCTURAL I WITH EXTERIOR GLUE CONFORMING TO THE LATEST EDITION OF PS1-09. ALL PANELS SHALL BEAR LEGIBLE DFPA STAMPS. 13. ORIENTED STRAND BOARD (OSB) MAY BE SUBSTITUTED FOR PLYWOOD PROVIDED IT HAS THE SAME APA PERFORMANCE STANDARD RATING AND CONTAINS THE SAME NUMBER OF LAYERS AS THE PLYWOOD SPECIFIED. 14. ALL SHEATHING SHALL BE LAID FACE GRAIN PERPENDICULAR TO FRAMING AND SHALL BE APPROVED BY THE BUILDING INSPECTOR BEFORE COVERING. 15. ALL NAILING/SCREWING SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND REGULATIONS. 16. ALL BOLT HOLES SHALL BE DRILLED 1/32" TO 1/16" OVERSIZED AND SHALL BE APPROVED BY THE BUILDING I NSPECTOR PRIOR TO COVERING. 17. UNLESS OTHERWISE NOTED, ALL WOOD SILL PLATE UNDER BEARING, EXTERIOR OR SHEAR WALLS IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESSURE TREATED AND BOLTED TO CONCRETE OR MASONRY WITH GALVANIZED OR STAINLESS STEEL ANCHORS AS INDICATED ON THE DRAWINGS. 18. ALL BOLT HEADS AND NUTS WHICH BEAR AGAISNT THE FACE OF WOOD MEMBERS SHALL BE PROVIDED WITH METAL WASHERS (1/4"x3"x3" MIN). 19. ALL 1/2" DIAMETER AND LARGER BOLTS CALLED OUT ON DRAWINGS, INCLUDING ANCHOR BOLTS (A.B.) SHALL HAVE STEEL SQUARE PLATE WASHERS AS LISTED BELOW UNDER THE HEAD AND/OR NUT BEARING ON WOOD. (ALL ANCHOR BOLTS SHALL BE 12" LONG, UNLESS NOTED OTHERWISE. 20. ALL ANCHOR BOLTS OR ANY OTHER BOLT ANCHORING THE FOUNDATION SILL PLATE SHALL HAVE STEEL SQUARE PLATE WASHERS PER THE BELWO SCHEDULE BETWEEN THE FOUNDATION SILL PLATE AND THE NUT (UNO). 21. FRAMING ACCESSORIES AND STRUCTURAL FASTENERS SHALL BE MANUFACTURED BY SIMPSON STRONG TIE (OR ENGINEER APPROVED EQUAL) AND OF THE SIZE AND TYPE SHOWN ON THE DRAWINGS. HARDWARE SHALL BE FULLY NAILED FOR MAXIMUM CAPACITY, UNLESS NOTED OTHERWISE. 22. LAG BOLTS (LAG SCREWS): PROVIDE LEAD HOLE 40% - 70% OF THREADED SHANK DIAMETER AND FULL DIAMETER FOR SMOOTH SHANK PORTION. 23. ALL NAILS CONNECTING WOOD MEMBERS SHALL BE COMMON NAILS. MINIMUM NAILING REQUIREMENTS OUTLINED IN TABLE 2304.10.1 SHALL BE FOLLOWED UNLESS OTHERWISE NOTED. 24. RETIGHTEN BOLTS BEFORE CLOSING-IN 25. ALL HOLD DOWN ANCHORS AND ALL OTHER ANCHORS AND MISCELLANEOUS METAL HANGERS ARE BY SIMPSON OR APPROVED EQUAL. DIMENSIONAL LUMBER USE SPECIES GRADE MOISTURE CONTENT LUMBER 2" TO 4" THICK x 5" OR WIDER (JOISTS/RAFTERS) DOUGLAS FIR-LARCH #2 & BETTER KD (15%) LUMBER 2" TO 3" THICK x 4" TO 6" WIDE (STUDS) DOUGLAS FIR-LARCH #2 & BETTER KD (15%) LUMBER 5x5 AND GREATER (BEAMS)DOUGLAS FIR-LARCH #1 S-DRY (19%) LUMBER 5x5 AND GREATER (POSTS)DOUGLAS FIR-LARCH #1 S-DRY (19%) WASHER - THICKNESS WASHER - WIDTH SQUARE BOLT DIAMETER 5/16"5/16" 3" 1/2" 5/8" 7/16"3/8" 3 1/2" 3/4" 7/8" 1/2" 4" 1" 3" 3" WASHER - THICKNESS WASHER - WIDTH BOLT DIAMETER 2 3/4" 5/16"1/4" 2 1/2" 1/2" 5/8" 7/16"3/8" 3"3 1/2" 3/4" 7/8" 1/2" 4" 1" WOODWOOD (CONT'D) 1. DESIGN OF ANCHORAGE AND SEISMIC BRACING FOR ALL MEP EQUIPMENT ARE DELEGATED DESIGN. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND CONSTRUCTION OF VERTICAL GRAVITY SUPPORT, SEISMIC RESTRAINT, AND ANCHORAGE TO PRIMARY STRUCTURE OF ALL MEP EQUIPMENT, INCLUDING AIR TERMINAL UNITS AND SOUND TRAPS, EXCEPT AS OTHERWISE SPECIFIED ON THE CONTRACT DOCUMENTS. DESIGN SHALL BE CAPABLE OF MITIGATING VIBRATIONS AND RESISTING DEAD AND THERMAL LOADS, AS WELL AS THE LOAD AND RELATIVE DISPLACEMENT EFFECTS PRESCRIBED BY ASCE 7-16, CH. 13. RELEVANT SEISMIC PARAMETERS AND COEFFICIENTS ARE INDICATED ON THESE DRAWINGS. APPROPRIATE COMPONENT COEFFICIENTS SHALL BE DETERMINED BY THE CONTRACTOR PER ASCE 7-16, CH. 13. DESIGN SHALL BE SUBMITTED TO THE ARCHITECT FOR GENERAL CONFORMANCE REVIEW. 3. CONTRACTOR SHALL VERIFY THAT ACTUAL PROCURED EQUIPMENT SPECIFICATIONS CONFORM TO DETAILS SHOWN ON THESE DRAWINGS (E.G. WEIGHT, SIZE, LOCATIONS, ETC.). WHEN DISCREPANCIES ARE DISCOVERED, CONTRACTOR SHALL NOTIFY ARCHITECT AND OWNER'S REPRESENTATIVE PRIOR TO FABRICATION OR INSTALLATION AND PROVIDE NEW EQUIPMENT SPECIFICATIONS TO ARCHITECT FOR DESIGN TEAM REVIEW AND APPROVAL. 4. VERTICAL SUPPORT AND SEISMIC RESTRAINT OF UTILITY DISTRIBUTION SYSTEMS A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND CONSTRUCTION OF COMPLETE VERTICAL GRAVITY SUPPORT, SEISMIC RESTRAINT, AND ANCHORAGE TO THE PRIMARY FRAME FOR ALL UTILITY DISTRIBUTION AND EQUIPMENT SYSTEMS IN CONFORMANCE WITH THE CODE AND ASCE 7-16, CH. 13, INCLUDING BUT NOT LIMITED TO: i. MECHANICAL DUCTWORK AND PIPING ii. ELECTRICAL CONDUIT iii. PLUMBING LINES iv. COMMUNICATION/INFORMATION TECHNOLOGY UTILITIES v. SPRINKLER SYSTEMS. B. DESIGN SHALL BE CERTIFIED BY A CIVIL ENGINEER REGISTERED IN THE STATE OF CALIFORNIA AND COMPLETED IN CONFORMANCE WITH REQUIREMENTS INDICATED IN THE PROJECT SPECIFICATIONS, DRAWINGS, AND THE CODE, UTILIZING THE SEISMIC PARAMETERS AND COEFFICIENTS INDICATED ON THESE DRAWINGS AND SPECIFIED IN ASCE 7-16. C. DESIGN SHALL COMPLY WITH THE SEISMIC FORCES AND RELATIVE DISPLACEMENTS REQUIRED BY ASCE 7-16, SECTION 13.3, UNLESS PRESCRIPTIVE REQUIREMENTS ARE FOLLOWED PER EXCEPTIONS LISTED FOR: i. CONDUIT, CABLE TRAY, AND RACEWAYS (ASCE 7-16, SECTION 13.6.5) ii. DUCT SYSTEMS (ASCE 7-16, SECTION 13.6.6) iii. PIPING AND TUBING SYSTEMS (ASCE 7-16, SECTION 13.6.7.3) D. IN-LINE DUCT COMPONENTS WEIGHING 75 LB OR LESS: SMALL TERMINAL UNITS, DAMPERS, LOUVERS, DIFFUSERS, ETC., THAT ARE NOT BRACED INDEPENDENTLY SHALL BE POSITIVELY ATTACHED WITH MECHANICAL FASTENERS TO THE RIGID DUCT ON BOTH SIDES. PIPING CONDUIT ATTACHED TO IN-LINE EQUIPMENT SHALL BE PROVIDED WITH ADEQUATE FLEXIBILITY TO ACCOMMODATE THE SEISMIC RELATIVE DISPLACEMENTS OF ASCE 7-16, SECTION 13.3.2. E. SPACING AND DETAILS OF THE SUPPORT AND BRACING OF FIRE SPRINKLER PIPING SHALL COMPLY WITH THE GOVERNING EDITION OF NFPA 13 AND ASCE 7-16, SECTION 13.6.7.2, AS MODIFIED BY THE CODE. F. BRACING AND ANCHORAGE DESIGN MAY BE REFERRED TO A PRE-APPROVED ANCHORAGE SYSTEM AND THE CONTRACTOR SHALL PROVIDE ENGINEERING DOCUMENTATION, INCLUDING INSTALLATION GUIDES/MANUALS FOR THE SELECTED PRE-APPROVED SYSTEM, TO THE ARCHITECT AND OWNER'S REPRESENTATIVE. G. POST-INSTALLED CONCRETE ANCHOR TYPES AND INSTALLATION REQUIREMENTS SHALL BE AS SPECIFIED ON THESE DRAWINGS. H. STORY DRIFT i. UTILITY DISTRIBUTION SYSTEMS, INCLUDING PIPING, DUCTWORK AND CONDUITS, SHALL BE DESIGNED TO ACCOMMODATE THE INTER-STORY DRIFT SPECIFIED ON THESE DRAWINGS (SEE DELEGATED DESIGN NOTES), AS REQUIRED PER ASCE 7-16, SECTION 13.3.2. ii. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FLEXIBLE CONNECTIONS BETWEEN UTILITY LINES AND FIXED EQUIPMENT IN CONFORMANCE WITH EQUIPMENT MANUFACTURER'S RECOMMENDATIONS, AS REQUIRED TO ACCOMMODATE INTER-STORY DRIFT AND FLOOR LIVE LOAD DEFLECTIONS. iii. PIPES, DUCTS AND CONDUITS THAT ROUTE WITHIN EXTERIOR WALL FRAMING SHALL NOT IMPEDE THE DESIGN DRIFT AT EXTERIOR FRAMING SLIP JOINTS. PIPES, DUCTS AND CONDUITS THAT CROSS EXTERIOR FRAMING SLIP JOINTS SHALL BE DESIGNED AND DETAILED TO ALLOW THE EXTERIOR FRAMING TO ACCOMMODATE THE DESIGN DISPLACEMENT CRITERIA (SEE “DELEGATED DESIGN”) AND SHALL, THEMSELVES, ACCOMMODATE THESE DISPLACEMENTS IF THEY ARE ATTACHED TO ANY ELEMENT OF THE EXTERIOR FRAMING SYSTEM. EQUIPMENT ANCHORAGE 2-16d AT EACH BEARING 20d AT 32" (813mm) OC AT TOP AND BOTTOM AND STAGGERED 2-20d AT ENDS AND AT EACH SPLICE 16d AT 24" (610mm) OC 16d AT 16" (406mm) o.c. ALONG EACH EDGE 8d AT 6" (152mm) OC 16d AT 16" (406mm) OC 16d AT 24" (610mm) OC 4-8d, TOENAIL OR 2-16d, END NAIL 3-16d PER 16"(406 mm) 16d AT 16" (406mm) OC 3. 1" X 6" (25mm X 152mm) SUBFLOOR OR LESS TO EACH JOIST, FACE NAIL 28. FIBERBOARD SHEATHING: 1/2" (12.7mm) OR LESS 27. PANEL SIDING (TO FRAMING) : 1 1/8"-1 1/4" (29mm-32mm) 7/8"-1" (22mm-25mm) 3/4" (19mm) AND LESS COMBINATION SUBFLOOR-UNDERLAYMENT (TO FRAMING): 1 1/8"-1 1/4" (29mm-32mm) 7/8"-1" (22mm-25mm) 19/32"-3/4" (15mm-19mm) 1/2" (12.7mm) AND LESS SUBFLOOR AND WALL SHEATHING (TO FRAMING): 26. WOOD STRUCTURAL PANELS AND PARTICLEBOARD: 24. BUILT-UP GIRDER AND BEAMS 23. BUILT-UP CORNER STUDS 22. WIDER THAN 1" X 8" (25mm X 203mm) SHEATHING TO EACH BEARING, FACE NAIL 21. 1" X 8" (25mm X 203mm) SHEATHING OR LESS TO EACH BEARING, FACE NAIL 20. 1" (25mm) BRACE TO EACH STUD AND PLATE, FACE NAIL 19. RAFTER TO PLATE, TOENAIL 18. CEILING JOISTS TO PARELLEL RAFTERS, FACE NAIL 17. CEILING JOIST, LAPS OVER PARTITIONS, FACE NAIL 16. CONTINUOUS HEADER TO STUD, TOENAIL 15. CEILING JOISTS TO PLATE, TOENAIL 14. CONTINUOUS HEADER, TWO PIECES 13. TOP PLATES, LAPS AND INTERSECTIONS, FACE NAIL 12. RIM JOIST TO TOP PLATE, TOENAIL 11. BLOCKING BETWEEN JOISTS OR RAFTERS TO TOP PLATE, TOENAIL DOUBLE TOP PLATES, LAP SPLICE 10. DOUBLE TOP PLATES, TYPICAL FACE NAIL 9. DOUBLE STUDS, FACE NAIL 7. TOP PLATE TO STUD, END NAIL SOLE PLATE TO JOIST OR BLOCKING, AT BRACED WALL PANELS 6. SOLE PLATE TO JOIST OR BLOCKING, TYPICAL FACE NAIL 5. 2" (51mm) SUBFLOOR TO JOIST OR GIRDER, BLIND AND FACE NAIL 4. WIDER THAN 1" X 6" (25mm X 152mm) SUBFLOOR TO EACH JOIST, FACE NAIL 25/32" (20mm) 29. INTERIOR PANELING 3/8" (9.5mm) 1/4" (6.4mm) 1/2" (12.7mm) 5/8" (16mm) 25. 2" (51mm) PLANKS 8. STUD TO SOLE PLATE 7 2. BRIDGING TO JOIST, TOENAIL EACH END 1. JOIST TO SILL OR GIRDER, TOENAIL NAILING SCHEDULE 4 5 48d 6d 4d NO.16 ga 11 10 9 NO.11 ga NO.16 ga 6d NO.11 ga 8d 6d 8 9 4 8 6 6 10d OR 8d 8d 6d 10d OR 8d 8d 8d AND 6d 4 4 5 5 5 5 3 3-8d 6d 3-8d 3 2-8d 2-8d 3-8d 3-16d 3-16d 4-8d 2-16d 3-8d 8-16d 2-16d 2-16d 3-8d 2-8d 2-8d 3-8d NAILING 1 1. THIS NAILING SCHEDULE SHALL ONLY BE USED IF CONDITION IS NOT OTHERWISE DETAILED OR SPECIFIED ON THE CONSTRUCTION DOCUMENTS. COMMON NAILS SHALL BE USED EXCEPT WHERE OTHERWISE STATED. 2. NAILS SPACED AT 6 INCHES (152mm) ON CENTER AT EDGES, 12 INCHES(305mm) AT INTERMEDIATE SUPPORTS EXCEPT 6 INCHES (152mm) AT ALL SUPPORTS WHERE SPANS ARE 48 INCHES (1219mm) OR MORE. FOR NAILING OF WOOD STRUCTURAL PANEL AND PARTICLEBOARD DIAPHRAGMS AND SHEAR WALLS, REFER TO SECTIONS OF THE CODE. 3. COMMON OR DEFORMED SHANK. 4. COMMON 5. DEFORMED SHANK 6. CORROSION-RESISTANT SIDING OR CASING NAILS CONFORMING TO THE REQUIREMENTS OF THE CODE. 7. FASTENERS SPACED 3 INCHES (76mm) ON CENTER AT EXTERIOR EDGES AND 6 INCHES (152mm) ON CENTER AT INTERMEDIATE SUPPORTS. 8. CORROSION-RESISTANT ROOFING NAILS WITH 7/16-INCH-DIAMETER (11mm) HEAD AND 1 1/2-INCH (38mm) LENGTH FOR 1/2" INCH (12.7mm) SHEATHING AND 1 3/4-INCH (44mm) LENGTH FOR 25/32 -INCH (20mm) SHEATHING CONFORMING TO THE REQUIREMENTS OF THE CODE. 9. CORROSION-RESISTANT STAPLES WITH NOMINAL 7/16-INCH (11mm) CROWN AND 1 1/8-INCH (29mm) LENGTH FOR 1/2- INCH (12.7mm) SHEATHING AND 1 1/2-INCH (38mm) LENGTH FOR 25/32 -INCH (20mm) SHEATHING CONFORMING TO THE REQUIREMENTS OF THE CODE. 10. PANEL SUPPORTS AT 16 INCHES (406mm) [20INCHES (508 mm) IF STRENGTH AXIS DIRECTION OF THE PANEL, UNLESS OTHERWISE MARKED]. CASING OR FINISH NAILS SPACED 6 INCHES (152mm) ON PANEL EDGES, 12 INCHES (305mm) AT INTERMEDIATE SUPPORTS. 11. PANEL SUPPORT AT 24 INCHES (610mm). CASING OR FINISH NAILS SPACED 6 INCHES (152mm) ON PANEL EDGES, 12 INCHES (305mm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x DIAMETER CENTER-TO-CENTER TO ANY ANCHOR IN SERVICE. ANCHORS NOT MEETING THIS MINIMUM SPACING MAY HAVE REDUCED CAPACITY AND SHALL BE REVIEWED WITH THE SEOR. LIMITATIONS OF USE OF POWER ACTUATED FASTENERS: PER SECTION 13.4.5 OF ASCE 7-16 POWER ACTUATED FASTENERS IN CONCRETE OR STEEL SHALL NOT BE USED FOR SUSTAINED TENSION LOADS OR FOR BRACE APPLICATIONS IN SEISMIC UNLESS APPROVED FOR SEISMIC LOADING. POWER ACTUATED FASTENERS IN MASONRY SHALL NOT BE PERMITTED UNLESS APPROVED FOR SEISMIC LOADING. EXCEPTION: POWER ACTUATED FASTENERS IN CONCRETE USED FOR SUPPORT OF ACOUSTICAL TILE OR LAY-IN PANEL SUSPENDED CEILING APPLICATIONS AND DISTRIBUTED SYSTEMS WHERE THE SERVICE LOAD ON ANY INDIVIDUAL FASTENER DOES NOT EXCEED 90 LB (400 N). TESTING CRITERIA FOR POST-INSTALLED ANCHORS IN CONCRETE 1. CONDUCT TESTING OF POST- INSTALLED ANCHORS PER SECTION 1910 OF THE CODE. 2. WHERE THE MANUFACTURER'S INSTALLATION INSTRUCTIONS OR APPLICABLE ICC-ES EVALUATION SERVICES REPORT CALL FOR THE APPLICATION OF AN INSTALLATION TORQUE, THE SPECIFIED TORQUE SHALL BE APPLIED WITH A CALIBRATED TORQUE WRENCH. THE SPECIFIED INSTALLATION TORQUE SHALL NOT BE EXCEEDED. 3. THE SPECIAL INSPECTOR SHALL BE ON THE JOBSITE DURING ANCHOR INSTALLATIONS AS REQUIRED PER CHAPTER 17 OF THE CODE, UNLESS OTHERWISE NOTED IN ICC-ES ESR, TO VERIFY ANCHOR, ANCHOR DIMENSIONS, CONCRETE TYPE, CONCRETE COMPRESSIVE STRENGTH, HOLE DIMENSIONS, ANCHOR SPACING, EDGE DISTANCES, SLAB THICKNESS, ANCHOR EMBEDMENT, AND INSTALLATION TORQUE. 4. TEST LOAD: REQUIRED TEST LOADS SHALL BE DETERMINED BY ONE OF THE FOLLOWING METHODS: A.TWICE THE MAXIMUM ALLOWABLE TENSION LOAD OR ONE AND A QUARTER (1 1/4) TIMES THE MAXIMUM DESIGN STRENGTH PROVIDED BY THE ICC REPORT OR DETERMINED PER ACI 318. THE TENSION TEST LOAD NEED NOT TO EXCEED 80 PERCENT OF THE NOMINAL YIELD STRENGTH OF THE ANCHOR (0.8 As Fy). SEE STRUCTURAL DETAILS FOR DESIGN-BASED TENSION TEST LOADS FOR ADHESIVE ANCHORS. B.THE MANUFACTURER'S RECOMMENDED INSTALLATION TORQUE AS APPROVED BY THE ICC REPORT. 5. TENSION OR TORQUE TESTING OF POST-INSTALLED ANCHORS SHALL BE DONE IN THE PRESENCE OF THE SPECIAL INSPECTOR AND A REPORT OF THE TEST RESULTS SHALL BE SUBMITTED TO THE IOR AND ENFORCEMENT AGENCY. 6. THE SPECIAL INSPECTOR SHALL SELECT ANCHORS FOR TESTING AT RANDOM. 7. TEST FREQUENCY: APPLICATION QUANTITY STRUCTURAL 100% OF BOLTS NON-STRUCTURAL 50%; ALTERNATE BOLTS IN A GROUP (SUCH AS EQUIPMENT ANCHORAGE) (TEST AT LEAST HALF OF THE ANCHORS IN GROUP) 8. TEST METHODS: TEST LOADS MAY BE APPLIED BY ANY METHOD THAT WILL EFFECTIVELY TRANSMIT A MEASURABLE TENSION LOAD TO THE ANCHOR. ACCEPTABLE METHODS INCLUDE: A. USE OF HYDRAULIC JACK, WHEREBY EITHER UNCONFINED OR CONFINED TESTING SHALL BE ACCEPTABLE; B.USE OF CALIBRATED SPRING LOADED DEVICES; OR C. USE OF A CALIBRATED TORQUE WRENCH FOR TORQUE-CONTROLLED EXPANSION ANCHORS. 9. TEST ACCEPTANCE CRITERIA: ACCEPTANCE CRITERIA FOR POST-INSTALLED ANCHORS SHALL BE BASED ON THE ICC REPORT OR MANUFACTURER'S WRITTEN INSTRUCTION AS ACCEPTABLE TO OSHPD. FIELD TESTS SHALL SATISFY THE FOLLOWING MINIMUM REQUIREMENTS: A.HYDRAULIC RAM METHOD: ANCHORS TESTED WITH A HYDRAULIC JACK OR SPRING LOADED DEVICES SHALL MAINTAIN THE TEST LOAD FOR A MINIMUM OF 15 SECONDS AND SHALL EXHIBIT NO DISCERNABLE MOVEMENT DURING THE TENSION TEST, E.G. AS EVIDENCED BY LOOSENING OF THE WASHER UNDER THE NUT. SCREW ANCHORS MAY BE LOOSENED A MAXIMUM ONE FULL TURN TO FACILITATE THE POSITIONING OF A TENSION TEST COLLAR. B.TORQUE WRENCH METHOD: ANCHORS TESTED WITH A CALIBRATED TORQUE WRENCH MUST ATTAIN THE SPECIFIED TORQUE WITHIN HALF (1/2) TURN OF THE NUT. EXCEPTIONS: ·WEDGE OR SLEEVE TYPE: ONE-QUARTER (1/4) TURN OF THE NUT FOR A 3/8 INCH ANCHOR ONLY. ·THREADED TYPE: ONE-QUARTER (1/4) TURN OF THE SCREW AFTER INITIAL SEATING OF THE SCREW HEAD. 10. IF ANY ANCHOR FAILS TESTING, TEST ALL ANCHORS OF THE SAME TYPE, INSTALLED BY THE SAME TRADE, AND NOT PREVIOUSLY TESTED UNTIL TWENTY (20) CONSECUTIVE ANCHORS PASS, THEN RESUME INITIAL TEST FREQUENCY. SHEAR DOWELS 25% OF DOWELS (WHERE REQUIREMENTS OF THE 2022 CBC ARE MET) 1. ALL EXPANSION TYPE ANCHORS SHALL CONSIST OF HILTI KWIK BOLT TZ2 CONCRETE ANCHORS PER ICC ESR-4266 REPORT. INSTALLATION SHALL BE IN CONFORMANCE WITH THE ICC REPORT. 2. ALL EPOXY TYPE ANCHORS SHALL CONSIST OF HILTI HIT HY-200 HYBRID ADHESIVE USED IN CONJUNCTION WITH DEFORMED REINFORCING BARS PER ICC REPORT ESR-3187. INSTALLATION OF ANCHORS SHALL BE IN CONFORMANCE WITH THE ICC REPORT. 3. WHEN INSTALLING DRILLED IN ANCHORS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS. 4. THE SPECIAL INSPECTOR MUST BE ON THE JOBSITE PERIODICALLY DURING ANCHOR INSTALLATION TO VERIFY ANCHOR TYPE, ANCHOR DIMENSIONS, CONCRETE TYPE, CONCRETE COMPRESSIVE STRENGTH, PREDRILLED HOLE DIMENSIONS, ANCHOR SPACING, EDGE DISTANCES, SLAB THICKNESS, ANCHOR EMBEDMENT AND TIGHTENING TORQUE. 5. TEST ALL POST-INSTALLED ANCHORS AS REQUIRED PER SECTION 1705 OF THE CODE. 6. ALL WEDGE ANCHORS SHALL BE CARBON STEEL, UNO. USE STAINLESS STEEL ANCHORS IN EXTERIOR EXPOSURE AND DAMP ENVIRONMENTS. 7. INSTALL POST-INSTALLED ANCHORS IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AS DEFINED IN THE ASSOCIATED IAPMO UES ER OR ICC ESR. 8. USE ONLY NON-REBAR CUTTING DRILL BITS TO DRILL HOLES IN CONCRETE, WHERE EXISTING CONCRETE IS DAMAGED AND/OR DRILLED HOLES ABANDONED, THE DAMAGED CONCRETE OR ABANDONED HOLES SHALL BE REPAIRED OR FILLED WITH NON-SHRINK GROUT, RESPECTIVELY, BRING EACH CONDITION TO THE ATTENTION OF THE ARCHITECT, SEOR, AND UNIVERSITY BEFORE IMPLEMENTING REPAIRS. POST INSTALLED CONCRETE ANCHORS 1. THE FOLLOWING ELEMENTS OF CONSTRUCTION SHALL HAVE CONTINUOUS INSPECTION BY A PROJECT INSPECTOR APPROVED BY THE JURISDICTION. A. CONCRETE. B. BOLTS INSTALLED IN CONCRETE. C. PLACING OF REINFORCING STEEL. D. ALL STRUCTURAL WELDING, INCLUDING REINFORCING STEEL. E. EXPANSION ANCHORS. F. EPOXY ANCHORS. G. POWDER ACTUATED FASTENERS/SHOT PINS. H. HIGH STRENGTH BOLTS. I. SEE GEOTECHNICAL ENGINEER'S REPORT FOR SPECIFIC INSPECTION REQUIREMENTS BY A SOILS ENGINEER REPRESENTATIVE. J. INSTALLATION OF METAL DECK HEADED STUDS. K. NONDESTRUCTIVE TEST OF ALL CJP GROOVE WELDS. 2. ALL SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 1704 OF THE CODE AND ANY ADDITIONAL REQUIREMENTS STATED IN THESE DRAWINGS AND/OR THE PROJECT SPECIFICATIONS. SPECIAL INSPECTIONS PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/ 1 2 / 2 0 2 5 1 2 : 0 3 : 2 0 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . r v t 2308 GENERAL NOTES FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S0.03 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB No.Description Date REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 BUILDING B BUILDING A N PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/ 1 2 / 2 0 2 5 1 2 : 0 3 : 2 1 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . rv t 2308 SITE PLAN FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S1.00 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 3/16" = 1'-0"1 STRUCTURAL REFERENCE SITE PLAN 3 No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 S S S S S S S S 15' -6" A 10' - 9" B 14' - 1" B 11' - 9" B 26' -1" A 32' -4" A 27' - 5" B S S R2 S1 S3 S4 V4 V5 Y2 R1 S2 R2 S1 S3 S4 R1 S2 9' - 11 3/4" 25' - 1 1/2" 39' - 7 1/4" 37' - 3 1/4" 6x8 CONT 30" WIDE x 18" DEEP FOOTINGS, TYP CENTER ON WALL 6x10 6x10 6x10 5" SLAB ON GRADE W/ #4 @ 12" OC EA WAY AT MID-DEPTH 8x10 8x10 6x10 6x6 6x8 STUDS 2x6 @ 16" OC, TYP, UNO PROVIDE WOOD SHEATHING, TYPE A PER 1/S6.06 TYP AT NON SHEAR WALL T.O. SLAB EL = 0' - 0" 6x6 STUDS 2x6@16" OC, BRACED @ 3RD POINT, MIN STUDS 2x10 @ 16" OC, TYP ALONG THIS GRID 6x6 6x6 6x6 HD4 HD1 HD4 HD4 HD4 HD1 HD1 HD2 HD2 HD2 HD2 HD1 HD1 HD1 N TOF= -1' - 0" TOF= -1' - 0" VIF 18' - 2 1/2" VIF 17' - 9 " VIF 17' - 9" VIF 16' - 1 1/2" VIF 18' - 2 " 8 S5.01 TYP AT EXT 9 S5.01 VIF 17' - 9 " 6x6 6x10 1' - 6" 4' - 0" TOF= -1' - 6"TOS= -1' - 0" TOS= -1' - 0" 3 TOF= -1' - 0" TOF= -1' - 0" 1' - 6" 4' - 0" 3 TOS= -2' - 0" FOUNDATION LEGEND: INDICATES STEPPED FOOTING PER DETAIL INDICATES TOP OF CONCRETE SLAB ELEVATION, UNO ON PLANS. VERIFY ALL SLAB ELEVATIONS WITH ARCHITECTURAL AND CIVIL DRAWINGS. INDICATES TOP OF FOOTING ELEVATION. TOP OF FOOTING SHALL BE 0' - 6" BELOW ADJACENT GRADE, UNLESS NOTED OTHERWISE. INDICATES STEP IN SLAB PER STEP AT UNDERSIDE OF SLAB NOT SHOWN FOR CLARITY. STEP LOCATIONS AND EXTENTS PER ARCH INDICATED SOG SLOPE CHANGE PER CIVIL AND ARCH INDICATES CONCRETE FOOTING BELOW PER . T.O. SLAB EL=XX'-XX" -TEXT" 1.SEE ARCHITECTURAL DRAWINGS FOR SLOPES, DRAINS, CURBS, ELEVATIONS AND DIMENSIONS NOT SHOWN. 2. SEE SHEETS S0.02 THROUGH S0.03 FOR GENERAL NOTES. 3. SEE GEOTECHNICAL REPORT FOR SOIL PREPARATION REQUIREMENTS AND EXCAVATION INSPECTION REQUIREMENTS. 4. SEE CIVIL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR LOCATION OF TRENCHES, FLOOR SINKS, AND UNDERGROUND UTILITIES. 5. SEE SHEETS S5.0X SHEET SERIES -FOR TYPICAL CONCRETE AND FOUNDATION DETAILS. 6. PROVIDE CONTROL JOINTS IN THE SLAB ON GRADE PER DETAIL . 7. FOR SOIL BASE UNDER THE SLAB ON GRADE, REFER TO GEOTECHNICAL REPORT. 8. GEOTECHNICAL ENGINEER SHALL OBSERVE FOOTING EXCAVATIONS PRIOR TO PLACEMENT OF REINFORCING STEEL. FOUNDATION PLAN NOTES: /6 S5.01 /7 S5.01. /8 S5.01 TOF= X' - X" /1 S5.02. 3 WOOD AND STEEL FRAMING LEGEND: INDICATES NON-STRUCTURAL PARTITION WALLS PER ARCH. INDICATES WOOD POST. P# INDICATES SHEAR WALLS ABOVE. SEE SHEET FOR PLYWOOD SHEATHING DESIGNATION. XX INDICATES STRUCTURAL SHEAR WALL COMPRESSION POSTS & HOLDDOWN PER SCHEDULE ON WOOD STEEL FRAMING NOTES: FOR SYMBOLS AND ABBREVIATIONS, SEE SHEET S0.01. FOR TYPICAL WOOD DETAILS, SEE S6.0X SERIES SHEETS. VERIFY ALL DIMENSIONS, ELEVATIONS,FINISH SURFACE, SLOPES, DRAINS, SLAB DEPRESSIONS, ETC. WITH ARCHITECTURAL AND MEP DRAWINGS, PRIOR TO START OF CONSTRUCTION. FOR LOCATION AND EXTENT OF EXTERIOR WALL ASSEMBLIES AND OPENINGS, SEE ARCHITECTURAL DRAWINGS. ALL NON STRUCTURAL WALLS SHALL BE PER ARCHITECTURAL DRAWINGS. PLYWOOD SHEATHING SHALL BE GLUED AND NAILED TO JOISTS. 1. 2. 3. 10. 6. HOLDOWN CONNECTORS SHALL BE RETIGHTENED JUST PRIOR TO ENCLOSURE. 4. ORIENTED STRAND BOARD MAY BE SUBSTITUTED FOR PLYWOOD FOR INTERIOR SHEATHING NOT EXPOSED TO MOISTURE ONLY. 5. TIE JOIST AND TIE JOIST BLOCKING SIZE TO MATCH FLOOR JOISTS, UNO. ATTACH PLYWOOD SHEATHING WITH NAILS AT 6" OC FULL LENGTH, UNO. 8. INTERIOR CORRIDOR WALLS AND SHEAR WALLS SHALL HAVE CONTINUOUS 1 3/4x11 7/8x LVL RIM JOIST UNO SPLICE. 9. TOP OF PLYWOOD SHEATING PER ARCHITECTURAL DRAWINGS.7. INDICATES HEADER BEAM PER DETAIL AND SCHEDULE ON & NOT ALL HEADERS ARE SHOWN ON PLAN HDR /1 S6.05 1/-/2 S6.03 X /1 S6.06 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/ 1 2 / 2 0 2 5 1 2 : 0 3 : 2 2 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . r v t 2308 FOUNDATION FRAMING PLAN - BUILDING A FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S1.01A SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1/4" = 1'-0"1 FOUNDATION PLAN - BUILDING A 3 No.Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 3 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 S S U6 U1 V1 V2 V4 V5 Y1 X1 Y2 X2 X3 U5 U4 U3 U2 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 21' - 3"9' - 10" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" 21 ' - 3 " TOF= -1' - 6" SLOPED HSS 7.625x0.375 TOF= -1' - 6" 18"-DEEP x 6'-0" WIDE COMBINED FTG SLOPED HSS 7.625x0.375 30"-DEEP x 4'-6"-WIDE CONT FTG CTR ON SHEAR WALLS, TYP, UNO W/ (7) #6 LONGITUDINAL T&B & #6 @ 9" OC TRANSVERSE T&B, TYP UNO 2' - 3 " 6' - 7 3 / 8 " TOF= -1' - 6" SLOPED HSS 7.625x0.375 18" THK x 5'-0" WIDE COMBINED FTGTOF= -1' - 6" 3' - 0"6' - 0"6' - 11"8' - 0" TOF= -2' - 6" T.O. SLAB EL = 0' - 0" 5" SLAB ON GRADE W/ #4 @ 12" OC EA WAY AT MID-HEIGHT 1 S2.01 2 S2.01 8' - 11 1/2" TOF= -1' - 6" 3' - 8" N 6' - 4" HSS6x6x1/4 4' - 9" 2' - 0" TYP, UNO CL FTG 6" 2' - 3" TOF= -1' - 6" T/ELEVATOR PIT EL = -4' - 0" TYP 3' - 0" F2 F2 F3 F1 F2 F3 2' - 8 " 2' - 3 3 / 8 " 1' - 1 0 3 / 4 " 19' - 9" 4" CL W A L L 5' - 7 1 / 2 " 4"4" CL W A L L CL W A L L CL WALL 4" 6' - 10 1/2"11' - 10"28' - 1 1/2" 20 ' - 7 " CL W A L L 4" 15' - 2 1/2" 2' - 3" CL WALL CL WALL 3' - 0 1/2"CL W A L L 4' - 7 3 / 8 " TOF= -1' - 6" -1 1 / 1 6 " -3 / 4 " 2' - 5 3/4" 7 S5.01 TYP AT SOG DEPRESSION 5 S5.02 X4 46' - 10" 4' - 8" 4" V3 3 3 9' - 2" 1' - 11" 3' - 3 " 5' - 2 " 3 ' - 0 1 / 2 " 1 ' - 6 " -3/4" HSS6x6x1/4 AT SAFETY BEAM, TYP HSS10x6x1/4 AT GUIDE RAIL, SUPPORT TYP 3 3 3 3 S5.11 7 310" 10" 1.SEE ARCHITECTURAL DRAWINGS FOR SLOPES, DRAINS, CURBS, ELEVATIONS AND DIMENSIONS NOT SHOWN. 2. SEE SHEETS S0.02 THROUGH S0.03 FOR GENERAL NOTES. 3. SEE GEOTECHNICAL REPORT FOR SOIL PREPARATION REQUIREMENTS AND EXCAVATION INSPECTION REQUIREMENTS. 4. SEE CIVIL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR LOCATION OF TRENCHES, FLOOR SINKS, AND UNDERGROUND UTILITIES. 5. SEE SHEETS FOR CONCRETE SHEAR WALL SCHEDULE AND DETAILS. 6. SEE SHEET S5.0X SHEET SERIES -FOR TYPICAL CONCRETE AND FOUNDATION DETAILS. 7. PROVIDE CONTROL JOINTS IN THE SLAB ON GRADE PER DETAIL . 8. FOR SOIL BASE UNDER THE SLAB ON GRADE, REFER TO GEOTECHNICAL REPORT. 9. GEOTECHNICAL ENGINEER SHALL OBSERVE FOOTING EXCAVATIONS PRIOR TO PLACEMENT OF REINFORCING STEEL. 11.SEE MEP DRAWING FOR THE EXACT LOCATION OF MEP EQ AND OPENING. FOUNDATION PLAN NOTES: FOUNDATION LEGEND: INDICATES STEPPED FOOTING PER DETAIL . INDICATES TOP OF CONCRETE SLAB ELEVATION, UNO ON PLANS. VERIFY ALL SLAB ELEVATIONS WITH ARCHITECTURAL AND CIVIL DRAWINGS. INDICATES TOP OF FOOTING ELEVATION. TOP OF FOOTING SHALL BE 1'-6" BELOW ADJACENT GRADE, UNLESS NOTED OTHERWISE. INDICATES STEP IN SLAB PER STEP AT UNDERSIDE OF SLAB NOT SHOWN FOR CLARITY. STEP LOCATIONS AND EXTENTS PER ARCH INDICATED SOG SLOPE CHANGE PER CIVIL AND ARCH 8"-THK CIP CONC BEARING SHEAR WALL , UNO. INDICATES CONCRETE FOOTING BELOW PER HSS POST SPREAD FOOTING PER T.O. SLAB EL=XX'-XX" -TEXT" /6 S5.01 /1 S5.02 /7 S5.01 /1 S5.11 TOF= X' - X" F#/4 S5.02 3 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/ 1 2 / 2 0 2 5 1 2 : 0 3 : 2 3 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . r v t 2308 FOUNDATION FRAMING PLAN - BUILDING B FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S1.01B SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1/4" = 1'-0"1 FOUNDATION PLAN - BUILDING B No.Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 R2 S1 S3 S4 R1 S2 9' - 11 3/4" 25' - 1 1/2" 39' - 7 1/4" 37' - 3 1/4" 0" HEADER 2x6 @ 24" OC HEADER 0" HEADER FC 200 LBS MAX 1/2" PLYWOOD SHEATHING AT ROOF (TYPE A) (BLK) (2) GLB AT OPERABLE PARTITION POCKET. LOC PER ARCH, 8'-0" MAX OC 2x6 @ 24" OC, TYP PARAPET PARAPET N 5.5 x 22.5 DF/DF 28F-V8 GLB HEADER 8.75x22.5 DF/DF 24F-V8 GLB HEADER DOWN SLOPE PER ARCH EL = 19' - 3" 1A S6.04 7 S6.22 SIM, TYP AT EXT 1B S6.04 HEADER EL = 14' - 5" 5.5 x 22.5 DF/DF 24F-V8 GLB HEADER EQ SPACED (8FT MAX), TYP, UNO 3 8.75x22.5 DF/DF 24F-V8 GLB HEADER 3 11 S6.22 SIM PARAPET 3 PARAPET 3 3 3 5.125x22.5DF/DF 24F-V8 GLB GIRDERS 9' - 6 1/2" TOP OF ROOF PLYWOOD SHEATHING TOP OF ROOF PLYWOOD SHEATHING 3 T.O. STEEL EL = 13' 4 1/4" W10x45, SUPPORTING OPERABLE PARTITION 3 S6.02 TYP 3 3 3 VIF WOOD AND STEEL FRAMING NOTES: FOR SYMBOLS AND ABBREVIATIONS, SEE SHEET S0.01. FOR GENERAL NOTES, SEE SHEETS S0.02 THROUGH S0.03 FOR TYPICAL WOOD DETAILS, SEE S6.0X SERIES SHEETS. VERIFY ALL DIMENSIONS, ELEVATIONS,FINISH SURFACE, SLOPES, DRAINS, SLAB DEPRESSIONS, ETC. WITH ARCHITECTURAL AND MEP DRAWINGS, PRIOR TO START OF CONSTRUCTION. FOR LOCATION AND EXTENT OF EXTERIOR WALL ASSEMBLIES AND OPENINGS, SEE ARCHITECTURAL DRAWINGS. ALL NON STRUCTURAL WALLS SHALL BE PER ARCHITECTURAL DRAWINGS. PLYWOOD SHEATHING SHALL BE GLUED AND NAILED TO JOISTS. 1. 2. 3. 10. 6. HOLDOWN CONNECTORS SHALL BE RETIGHTENED JUST PRIOR TO ENCLOSURE. 4. ORIENTED STRAND BOARD MAY BE SUBSTITUTED FOR PLYWOOD FOR INTERIOR SHEATHING NOT EXPOSED TO MOISTURE ONLY. 5. TIE JOIST AND TIE JOIST BLOCKING SIZE TO MATCH FLOOR JOISTS, UNO. ATTACH PLYWOOD SHEATHING WITH NAILS AT 6" OC FULL LENGTH, UNO. 8. INTERIOR CORRIDOR WALLS AND SHEAR WALLS SHALL HAVE CONTINUOUS 1 3/4x11 7/8x LVL RIM JOIST UNO SPLICE. 9. TOP OF PLYWOOD SHEATING PER ARCHITECTURAL DRAWINGS.7. WOOD AND STEEL FRAMING LEGEND: INDICATES WOOD POST OR STEEL POST BELOW. UNO SEE POST SCHEDULE, BELOW.OR P# PS# HEAVY MEP EQUIPMENT AREA ON ROOF. BEARING WALL TYPES AS NOTED ON PLAN. INDICATES STRUCTURAL SHEAR WALL COMPRESSION POSTS SEE LVL BELOW. INDICATES HEADER BEAM PER DETAIL AND SCHEDULE ON 1 & NOT ALL HEADERS ARE SHOWN ON PLAN. HDR /2 S6.03. PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/ 1 2 / 2 0 2 5 1 2 : 0 3 : 2 3 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . rv t 2308 ROOF FRAMING PLAN - BUILDING A FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S1.02A SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1/4" = 1'-0"1 ROOF FRAMING PLAN - BUILDING A No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 D-1 U6 U1 V1 V2 V4 V5 Y1 X1 Y2 X2 X3 U5 U4 U3 U2 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 21' - 3" 9' - 10" 46' - 10" 10' - 4 3/8" 11' - 6 3/8" 11' - 6 3/8" 10' - 5 5/8" ROUND HSS SLOPED POST BELOW ROUND HSS SLOPED POST BELOW 5' - 5 1/8" TO SLAB ELEV 12'-11 1/2" TOS ELEV 12'-5 1/4" TO WALL ELEV 12' - 5 1/4" TYP, UNO 1 S2.01 2 S2.01 W 1 6 x 2 6 W 1 6 x 2 6 W14x22 W18x60 W14x22 W18x35 W18x35 W18x35 W18x35 W14x22 W18x35 W18x35 W18x35 W16x31 W18x35 W14x22 W18x35 W16x26 W16x26 W18x40 W16x26 W14x22 W18x35 W18x40 W16x26 W16x26 W18x35 W14x22 W18x40 W16x26 W18x50 W14x22 W18x35 W16x26 W18x35 W18x35 W14x22 W14x22 W14x22 W18x35 3' - 1" 5' - 5 3/8" 6 ' - 0" 6 ' - 0" N W14x22 POST BLW POST BLW POST BLW W14x22 W14x22 W14x22 W14x22 W14x22 13' - 4 1/4" W18x40 ALIGNED WITH WOOD SHEAR WALL ABOVE W14x22 W14x22 W14x22 W14x22 ALIGNED WITH WOOD SHEAR WALL ABOVE ALIGNED WITH WOOD SHEAR WALL ABOVE ROUND HSS SLOPED POST BELOW 8 S7.11 TYP AT CONC WALL -2 1/4" -2 1/4" D1 D2 W18x40 8 S5.02 ADDL (2) #4 x 6'-0", CTR ON BEAM WITHIN CONCRETE DECK ADDL (2) #4 x 6'-0", CTR ON BEAM WITHIN CONCRETE DECK 8 S5.02 ADDL (2) #4 WITHIN CONCRETE DECK X4 W14x22 V3 1 S5.03 8 S7.02 TYP AT WF TO CONC WALL W14x22 3 6' - 4" W14x22 10' - 6" ELEVATOR HSS POST PER S1.01B, TYP 3' - 8 1/2" W14x22 3 6 1/4" 6 S7.12 5 S7.12 3 3 6 1/2"3 3 3 3 MAX UNSHORED SPAN FOR SINGLE SPAN IS 8'-10" PER 1/S7.11 3 3 3 S7.12 3 S7.126 6 (-/+X") -TEXT" T.O.SLAB= X'-X" T.O.STEEL = X'-X" TYPICAL STEEL FRAMING LEGEND: INDICATES TOP OF SLAB ELEVATION IF DIFFERS FROM PLAN NOTES. INDICATES TOP OF STEEL ELEVATION IF DIFFERS FROM PLAN NOTES. INDICATES TOP OF STEEL BEAM RELATIVE THE REFERENCED T.O.STEEL ELEVATION. INDICATES FLOOR ELEVATION CHANGE. INDICATES DECK TYPE. SEE DETAIL INDICATES DRAG CONNECTION SEE SCHEDULE ON DETAIL INDICATES FULL HEIGHT STIFFENER PER DETAIL INDICATES GRAVITY (NON-SEISMIC) MOMENT CONNECTION SEE DETAILS 1 & INDICATES BEAM BOTTOM FLANGE BRACE PER DETAIL INDICATES OPENING TO SLAB ON METAL DECK PER ARCH. INDICATES FULL BOTTOM FLANGE LATERAL SUPPORT PER DETAIL /3 S7.01. /1 S7.11. /2 S7.01. /7 S7.01. /7 S7.02. /2 S7.01. 1. SEE SHEET ARCHITECTURAL DWGS FOR GRID DIMENSIONS & HORIZONTAL CONTROL. 2. SEE S0.01 FOR SYMBOLS AND ABBREVIATIONS. 3. SEE S0.0X SERIES SHEETS FOR GENERAL NOTES. 4. SEE S7.0X SERIES SHEETS FOR TYPICAL STEEL DETAILS. 5. SEE S7.1X SERIES SHEETS FOR STEEL DECK AND EDGE OF SLAB DETAILS. 6. PROVIDE 1 WELDED HEADED SHEAR STUD PER FOOT FOR ALL GRAVITY BEAM, UNO. 7. ALL BEAMS SHALL BE EQUALLY SPACED BETWEEN COLUMNS UNLESS NOTED OTHERWISE. 8. BEAMS AROUND INTERIOR OPENINGS ARE 1'-0" FROM EDGE OF OPENING, UNO. 9. FOR BALANCE OF ELEVATOR SHAFT & GUIDERAIL SUPPORT STEEL SEE 10. SEE ARCHITECTURAL DWGS FOR FLOOR OPENING AND DIMENSIONS AND FOR EDGE OF SLAB. 11. T.O. STEEL OF INFILL BEAMS TO MATCH BOTTOM OF DECK @ SUPPORTING BEAMS/GIRDERS UNO. TYPICAL STEEL FRAMING NOTES: PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 4/ 2 4 / 2 0 2 5 2 : 2 4 : 2 2 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . rv t 2308 LEVEL 2 CMD + STEEL FRAMING PLAN - BUILDING B PLAN CHECK SUBMITTAL 0 S1.02B SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1/4" = 1'-0"1 LEVEL 2 CMD + STEEL FRAMING PLAN - BUILDING B No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 6 PLAN CHECK SUBMITTAL 03 04-28-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA /1 /20252814 3 APRIL 28, 2025 5' -0" A 12' -11" A 16' -6" A 6' -7" A 6' - 0" A 11' - 6" A 6' - 1" A 6' -8" A 5' - 4" A 25' - 0" A 10' - 11" A 11' - 3" A 6' -6" A 6' -0" A 6' -0" A 5' -9" A 10' - 0" A 5' -0" A 10' -3" A 6' -6" A 14' -0" A 11' -9" A 7' -8" A 12' -1" A 12' -8" A 11' - 0" A 10' - 6" A U6 U1 V1 V2 V4 V5 Y1 Y2 U5 U4 U3 U2 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 HD1 1 S2.01 2 S2.01 HD1 HD1 N 6x8 POST 6' - 7 1/2" 6x8 POST 6x8 POST 4 S7.02 TYP AT HOLDDOWN PROVIDE WOOD SHEATHING TYPE A PER 1/S6.06, TYP AT NON-SHEAR WALL STUDS 2x6 @ 16" OC, TYP AT ALL SHEAR WALLS AND BEARING WALLS, UNO NON-BEARING PARTITION, SEE 2/S6.04 STUDS 2x6 @ 16" OC, TYP AT EXT WALLS V3 6 S6.04 6 S6.04 6 S6.04 6x811' - 7"POST ELEVATOR HSS POST PER S1.01B, TYP 3 3 WOOD AND STEEL FRAMING LEGEND: INDICATES NON-STRUCTURAL PARTITION WALLS PER ARCH. INDICATES WOOD POST OR STEEL POST BELOW. UNO SEE POST SCHEDULE, BELOW. OR P# PS# HEAVY MEP EQUIPMENT AREA ON ROOF. BEARING WALL TYPES AS NOTED ON PLAN. ACCESSIBLE ROOF DECK WITH PLANTERS AREA ON ROOF. BEARING WALL TYPES AS NOTED ON PLAN. INDICATES SHEAR WALLS ABOVE. SEE SHEET FOR PLYWOOD SHEATHING DESIGNATION. X INDICATES STRUCTURAL SHEAR WALL COMPRESSION POSTS & HOLDDOWN PER SCHEDULE ON 1/S6.05 WOOD AND STEEL FRAMING NOTES: FOR SYMBOLS AND ABBREVIATIONS, SEE SHEET S0.01. FOR GENERAL NOTES, SEE SHEETS S-002 THRUGH S-0006. FOR TYPICAL WOOD DETAILS, SEE S6.0X SERIES SHEETS. VERIFY ALL DIMENSIONS, ELEVATIONS,FINISH SURFACE, SLOPES, DRAINS, SLAB DEPRESSIONS, ETC. WITH ARCHITECTURAL AND MEP DRAWINGS, PRIOR TO START OF CONSTRUCTION. FOR LOCATION AND EXTENT OF EXTERIOR WALL ASSEMBLIES AND OPENINGS, SEE ARCHITECTURAL DRAWINGS. ALL NON STRUCTURAL WALLS SHALL BE PER ARCHITECTURAL DRAWINGS. PLYWOOD SHEATHING SHALL BE GLUED AND NAILED TO JOISTS. 1. 2. 3. 11. 7. HOLDOWN CONNECTORS SHALL BE RETIGHTENED JUST PRIOR TO ENCLOSURE. 5. ORIENTED STRAND BOARD MAY BE SUBSTITUTED FOR PLYWOOD FOR INTERIOR SHEATHING NOT EXPOSED TO MOISTURE ONLY. 6. TIE JOIST AND TIE JOIST BLOCKING SIZE TO MATCH FLOOR JOISTS, UNO. ATTACH PLYWOOD SHEATHING WITH NAILS AT 6" OC FULL LENGTH, UNO. 9. INTERIOR CORRIDOR WALLS AND SHEAR WALLS SHALL HAVE CONTINUOUS 1 3/4x11 7/8x LVL RIM JOIST UNO SPLICE. 10. TOP OF PLYWOOD SHEATING PER ARCHITECTURAL DRAWINGS.8. VERIFY ELEVATOR OPENINGS WITH ELEVATOR MANUFACTURER PRIOR TO CONSTRUCTION. 4. X /1 S6.06 3 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/ 1 2 / 2 0 2 5 1 2 : 0 3 : 2 4 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . rv t 2308 LEVEL 2 WOOD FRAMING PLAN - BUILDING B FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S1.03B SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1/4" = 1'-0"1 LEVEL 2 WOOD FRAMING PLAN - BUILDING B No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 U6 U1 V1 V2 V4 V5U5 U4 U3 U2 24' - 3 3/4" 7' - 7 1/4" 23' - 5 5/8" 20' - 4 7/8" 5' - 5 1/8" 10' - 4 3/8" 23' - 0 3/4" 10' - 5 5/8" HEADER HEADER HEADER HEADER TJI HEADER TJI HEADER 11 7/8" DEEP TJI @ 24" OC 6x16 HEADER 11 7/8" DEEP TJI @ 24" OC 6x16 HEADER HEADER HEADER 11 7/8" DEEP TJI @ 24" OC HEADER PARAPET HEADER HEADER HEADER 16" DEEP TJI @ 24" OC TJI HEADER TJI HEADER PARAPET HEADER HEADER HEADER HEADER HEADER HEADER T/PARAPET ELEV = VARIES T/PARAPET ELEV = VARIES 11 7/8" DEEP TJI @ 24" OC TJI HEADER 1 S2.01 2 S2.01 N 4 S6.22 TYP AT EXT 7 S6.22 TYP AT EXT 11 S6.22 TYP AT INTERIOR 10 S6.22 TYP AT INTERIOR HEADER HEADER HEADER 6x16 HEADER HEADER HEADER HEADER HEADER HEADER HEADER V3 SLOPE PER ARCHDOWN ELEVATOR HSS POST PER S1.01B, TYP 3 3 EL = 27' - 8 1/2" TOP OF ROOF PLYWOOD SHEATHING EL = 22' - 8 1/2" TOP OF ROOF PLYWOOD SHEATHING 3 3 AC 150 LBS MAX ADDL 16" DEEP TJI @ 24" OC UNDER EQ 3 WOOD AND STEEL FRAMING LEGEND: INDICATES WOOD POST OR STEEL POST BELOW. UNO SEE POST SCHEDULE, BELOW. OR P# PS# HEAVY MEP EQUIPMENT AREA ON ROOF. BEARING WALL TYPES AS NOTED ON PLAN. ACCESSIBLE ROOF DECK WITH PLANTERS AREA ON ROOF. BEARING WALL TYPES AS NOTED ON PLAN. INDICATES SHEAR WALLS BELOW. INDICATES STRUCTURAL SHEAR WALL COMPRESSION POSTS SEE LEVEL BELOW INDICATES EXTERIOR BEARING WALL STUD TYPE FOR WALL BELOW. INDICATES INTERIOR BEARING WALL STUD TYPE FOR WALL BELOW. WX# W# WOOD AND STEEL FRAMING NOTES: FOR SYMBOLS AND ABBREVIATIONS, SEE SHEET S0.01. FOR GENERAL NOTES, SEE SHEETS S-002 THRUGH S-0006. FOR TYPICAL WOOD DETAILS, SEE S6.0X SERIES SHEETS. VERIFY ALL DIMENSIONS, ELEVATIONS,FINISH SURFACE, SLOPES, DRAINS, SLAB DEPRESSIONS, ETC. WITH ARCHITECTURAL AND MEP DRAWINGS, PRIOR TO START OF CONSTRUCTION. FOR LOCATION AND EXTENT OF EXTERIOR WALL ASSEMBLIES AND OPENINGS, SEE ARCHITECTURAL DRAWINGS. ALL NON STRUCTURAL WALLS SHALL BE PER ARCHITECTURAL DRAWINGS. PLYWOOD SHEATHING SHALL BE GLUED AND NAILED TO JOISTS. 1. 2. 3. 11. 7. HOLDOWN CONNECTORS SHALL BE RETIGHTENED JUST PRIOR TO ENCLOSURE. 5. ORIENTED STRAND BOARD MAY BE SUBSTITUTED FOR PLYWOOD FOR INTERIOR SHEATHING NOT EXPOSED TO MOISTURE ONLY. 6. TIE JOIST AND TIE JOIST BLOCKING SIZE TO MATCH FLOOR JOISTS, UNO. ATTACH PLYWOOD SHEATHING WITH NAILS AT 6" OC FULL LENGTH, UNO. 9. INTERIOR CORRIDOR WALLS AND SHEAR WALLS SHALL HAVE CONTINUOUS 1 3/4x11 7/8x LVL RIM JOIST UNO SPLICE PER . 10. TOP OF PLYWOOD SHEATING PER ARCHITECTURAL DRAWINGS.8. INDICATES HEADER BEAM PER DETAIL AND SCHEDULE ON 1 & 2/S6.03 NOT ALL HEADERS ARE SHOWN ON PLAN HEADER VERIFY ELEVATOR OPENINGS WITH ELEVATOR MANUFACTURER PRIOR TO CONSTRUCTION. 4. V4 V5 U5 U4 7' - 7 1/4" HOIST BEAM, W8x28, TYP. LOCATION PER ELEVATOR MFR. SEE 10/S7.02 FOR CONN TO HSS POST 1/2" PLYWOOD SHEATHING AT ROOF (TYPE A) (BLK) ELEVATOR HSS POST PER S1.01B, TYP SLOPE PER ARCH 5 S6.30 ROOF JOIST 2x6 @ 16" OC 6 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 4/ 2 4 / 2 0 2 5 2 : 2 4 : 2 2 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . rv t 2308 ROOF FRAMING PLAN - BUILDING B PLAN CHECK SUBMITTAL 0 S1.04B SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1/4" = 1'-0"1 ROOF FRAMING PLAN - BUILDING B No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 6 PLAN CHECK SUBMITTAL 03 04-28-2025 SCALE : 1/4" = 1'-0"1A ROOF POP-OUT AT ELEVATOR 3 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA /1 /20252814 APRIL 28, 2025 3 LEVEL 01 0' -0" V1V2V4V5 FTG PER PLAN SLOPED POST PER PLAN SLOPED POST PER PLAN CONC FILLED METAL DECK PER PLAN EDGE BEAM PER PLAN BOTTOM/GIRDER W18x PER PLAN2 TYP 1 WP PERP CANTILEVER PER PLAN S7.02 6 TYP S7.02 3 TYP T.O. ROOF 30' -8 1/2" LEVEL 02 12' -11 1/2" CL B E A M V3 LEVEL 01 0' -0" U6 U5 FTG PER PLAN SLOPED POST PER PLAN WP PER PLAN BOTTOM/GIRDER W18x PER PLAN CONC FILLED METAL DECK PER PLAN 2 TYP 1 CL B E A M S7.02 5 S7.02 6 TYP AT SLOPED HSS COL S7.02 3 TYP T.O. ROOF 30' -8 1/2" LEVEL 02 12' -11 1/2" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/ 1 2 / 2 0 2 5 1 2 : 0 3 : 2 5 P M Au t o d e s k D o c s : / / 2 3 0 8 _ S A Z _ H i v e / 2 3 0 0 1 7 5 _ S A Z _ K P F F _ R 2 2 . rv t 2308 BUILDING B ELEVATION FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S2.01 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1/4" = 1'-0"1 BUILDING B SOUTH ELEVATION 01 SCALE : 1/4" = 1'-0"2 BUILDING B WEST ELEVATION 01 ELEVATOR PIT PER PLAN No. Description Date REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 REBAR LAP SPLICE LENGTH SCHEDULE BAR SIZE LAP CLASS NORMAL WEIGHT CONCRETE f'c = 4000 psi f'c = 5000 psi Top Bars Other Bars Top Bars Other Bars Case 1 Case 2 Case 1 Case 2 Case 1 Case 2 Case 1 Case 2 3 A 1'-5" 2'-1" 1'-1" 1'-8" B 1'-10" 2'-9" 1'-5" 2'-1" 4 A 1'-11" 2'-10" 1'-5" 2'-2" B 2'-5" 3'-8" 1'-11" 2'-10" 5 A 2'-4" 3'-6" B 3'-0" 4'-6" 6 A 3'-11" 4'-2" B 3'-7" 5'-5" 7 A 4'-8" 6'-1" B 5'-3" 7'-11" 4'-1" 4'-8" 8 A 4'-8" 6'-11" 3'-7" 5'-4" B 6'-0" 9'-0" 4'-8" 6'-11" 9 A 5'-3" 7'-10" 4'-0" 6'-0" B 6'-9" 10'-2" 5'-3" 7'-10" 10 A 5'-11" 8'-10" 5'-6" 7'-9" B 7'-8" 11'-5" 5'-11" 8'-10" 11 A 6'-6" 9'-9" 5'-0" 7'-6" B 8'-6" 12'-8" 6'-6" 9'-9" 1'-7" 2'-4" 1'-3" 1'-10" 2'-1" 3'-1" 1'-7" 2'-4" 2'-1" 3'-1" 1'-7" 2'-5" 2'-9" 4'-1" 2'-1" 3'-1" 2'-7" 3'-11" 2'-0" 3'-0" 3'-5" 5'-1" 2'-7" 3'-11" 3'-1" 4'-8" 2'-5" 3'-7" 4'-1" 6'-1" 3'-1" 4'-8" 4'-6" 6'-9" 3'-6" 5'-3" 5'-11" 8'-10" 4'-6" 6'-9" 5'-2" 7'-9" 4'-0" 6'-0" 6'-9" 10'-1" 5'-2" 7'-9" 5'-10" 8'-9" 4'-6" 6'-9" 7'-7" 11'-4" 5'-10" 8'-9" 6'-7" 9'-10" 5'-1" 7'-7" 8'-6" 12'-9" 6'-7" 9'-10" 7'-3" 10'-11" 5'-7" 8'-5" 9'-6" 14'-2" 7'-3" 10'-11" 1'-10" 2'-8" 2'-4" 3'-6" 2'-2" 3'-3" 2'-10" 4'-2" 3'-2" 4'-8" NOTES: 1. CASES 1 AND 2 WHICH DEPEND ON CLEAR CONCRETE COVER AND THE CENTER-TO- CENTER SPACING OF THE BARS ARE DEFINED AS: CASE 1: COVER AT LEAST 1db AND CLEAR SPACING AT LEAST 2db. CASE 2: COVER LESS THAN 1db OR CLEAR SPACING LESS THAN 2db. 2. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12 INCHES OF CONCRETE CAST BELOW THE BARS. 3. OTHER BARS INCLUDE VERTICAL BARS AND HORIZONTAL BARS WITH LESS THAN 12 INCHES OF CONCRETE CAST BELOW HORIZONTAL BARS. 4. BAR SPLICES NOT COVERED BY THIS SCHEDULE ARE SPECIFICALLY DETAILED AND DIMENSIONED PER PLANS. 5. ALL SPLICES SHALL BE CLASS 'B' UNLESS OTHERWISE ON PLANS. 6. FOR DEVELOPMENT LENGTH, Ld, USE CLASS 'A' LAP SPLICE LENGTH. 7. FOR LAP SPLICES OF BARS IN SHEAR WALLS, REFER TO LAP SPLICE AND DEVELOPMENT SCHEDULE IN CONCRETE WALL ELEVATIONS. 8. THIS SCHEDULE IS FOR GR 60 REINFORCEMENT. 9. CAN USE 1.25Ld IN LIEU OF NOTE 7 AT SHEAR WALLS. 10. FOR STAGGERED SPLICES, CLEAR SPACING SHOWN IN DIAGRAM MAY BE USED TO DETERMINE CASE 1 OR CASE 2 PER NOTE 1 3 3 TYPE OF STANDARD HOOK BAR SIZE MINIMUM INSIDE BEND DIAMETER, IN STRAIGHT EXTENSION [1] ℓEXT, IN TYPE OF STANDARD HOOK 90-DEGREE HOOK #3 THROUGH #8 6db #9 THROUGH #11 8db 12db ℓ EX T 90° BEND db GREATER OF 4db AND 2.5 IN ℓEXT db 180-DEGREE HOOK 18 0 ° B E N D DIAMETER DIAMETER NOTES: 1. ACI 318-14 TABLE 25.3.2. 2. ALL HOOKED BARS SHALL EXTEND AS FAR AS POSSIBLE WITH A MINIMUM 2" END COVER AND WITH EMBEDMENT NOT LESS THAN SHOWN ON THE SCHEDULE. UNO ON PLANS. #14 THROUGH #18 10db #3 THROUGH #8 6db #9 THROUGH #11 8db #14 THROUGH #18 10db POINT AT WHICH BAR IS DEVELOPED ℓdh POINT AT WHICH BAR IS DEVELOPED ℓdh NORMAL WEIGHT BAR SIZE #3 #4 #5 #6 #7 #8 #9 #10 D 2 1/4"5" 3" 8" 3 3/4" 10 4 1/2"12 5 1/4" 6" 1'-4" 9 1/2" 1'-7 1/2" 10 3/4" 1'-10" LIGHT WEIGHT 5000 5000 0'-7" 0'-9" 0'-11" 1'-1" 1'-3" 1'-5" 1'-8" 1'-10" 0'-9" 1'-0" 1'-2" 1'-5" 1'-8" 1'-11" 2'-1" 2'-5" STANDARD HOOK DEVELOPMENT LENGTH " " "l "h l dh 1'-2" 2" CLR MIN FACE OF CONCRETE 2" CLR MIN FACE OF CONCRETE 4000 0'-8" 0'-10" 1'-0" 1'-3" 1'-5" 1'-7" 1'-10" 2'-1" 4000 0'-10" 1'-1" 1'-4" 1'-7" 1'-10" 2'-1" 2'-4" 2'-8" UNO ls 6" M A X 1 1 / 2 " M I N 1:6 MAXIMUM SHOP OFFSET BEND AS REQUIRED OR WHERE SHOWN ON PLANS. SPACING CLEAR NON-CONTACT LAP SPACING CLEAR SPACING CLEAR #4 DOWELS TO MATCH SOG TYP REINF SPACING TOP OF SLAB SEE PLAN 2 1 FINISH SURFACE SEE ARCH FOR EDGE FINISH SEE FOR SLAB ON GRADE SUPPORT INFO REINF PER PLAN (CENTERED IN SOG) /4 S5.01 MIN 8" LAP SPLICE CLASS B PER PLAN THICKNESS 8" MIN SEE NOTE 1 NOTES: 1. AT GREENHOUSE, DIMENSION TO BE 1' - 0". NOTES: 1. REFER TO GEOTECH REPORT FOR ADDITIONAL REQUIREMENTS. 2. CONTRACTOR SHALL TAKE CARE NOT TO PUNCTURE VAPOR RETARDER DURING CONSTRUCTION OF SLAB ON GRADE. 3. PROVIDE VAPOR RETARDER AT AREAS AND WITH EXTENTS/TERMINATIONS AS SPECIFIED BY ARCH. 4. VAPOR RETARDER AND/OR GRAVEL LAYER MAY BE OMITTED AT PARKING/DRIVE ISLE AREAS. GEOTECH ENGINEER SHALL CONFIRM BASED ON FIELD TESTING OF IN-SITU SOILS. APPROVED 15 MIL CLASS A VAPOR BARRIER. INSPECT AFTER REINF PLACEMENT AND REPAIR PER MANUF RECOMMENDATIONS BEFORE POURING OF CONCRETE COMPACTED SOIL (SEE GEOTECH REPORT) REINF PER PLAN SAND 2" CLEAN OR COURSE SAND 4" CLEAN CRUSHED GRAVEL SOG PER PLAN USE PRECAST BLOCK TO CHAIR REINF SLAB PER PLAN #4 @ 16" OC ROUGHEN SLAB #4 CONT TOP & BOT #2 0 " 8" MAX SEE ARCH 4" MIN PER ARCH EQ ROUGHEN SURFACE (1) #4 CONT 4" MIN PER ARCH SLAB ON GRADE PER PLAN (4 1/4" MIN) 8" MAX SEE ARCH #4 EPOXY DOWELS @ 16" OC W/ 3" EMBED #1 NOTES: 1. SEE GENERAL NOTES FOR EPOXY. 2. USE NON-DESTRUCTIVE METHODS TO LOCATE EXISTING REINFORCING BARS. DO NOT CUT EXISTING REINFORCING BARS WHICH MAY CONFLICT WITH ANCHOR LOCATION. CONTINUOUS FORMED KEY BREAK BOND W/ CURING COMPOUND NOTES: 1. CONTROL JOINTS TO BE LOCATED AT COLUMN CENTER LINES AND AT 15'-0" MAX. AND EVERY 225 SQUARE FEET. 2. IF SAW-CUT CONTROL JOINT TO BE USED, SAW-CUT WITHIN 24 HOURS OF POUR. 3. CONSTRUCTION JOINT TO BE LOCATED AS PER NOTES #1 AND #2 UNLESS SPECIFICALLY INDICATED ON PLANS. REFER TO ARCH DWGS FOR ADDITIONAL LOCATIONS. 1 1/2" DO NOT CUT REBAR T/4, MAX JOINT SEALANT 1/8" PREMOLDED STRIP FILL W/ SEMI-RIGID T/4 1/8" SAW CUT EQ EQ EQ PER PLAN T THICKNESS CONSTRUCTION JOINT CONTROL JOINTS FORMED JOINT SAW-CUT JOINT MIN 3/4" CLEAR TO REINF MIN 3/4" CLEAR TO REINF 1'-6" 1'-6" 1'-6" #4 @ 16"OC 2 SEE PLAN TOP OF SLAB #4 NOSING BAR 1 SEE ARCH FOR SIZE AND LOCATION OF CURB WHERE OCCURS #4 CONT T&B @ CURB. OFFSET TOP BAR TO NOT FOUL W/ ANCHOR BOLT #4 @ 16" AT CURB SEE ARCH 4" MIN - 8" MAX 1' - 0" (4" MAX) SEE PLANS DEPRESSION IN SLAB ON GRADE SEE ARCH 3 1/2" MIN SHEATHING PER PLAN ANCHOR PER WALL FRAMING (SEE NOTE) FURRING PER ARCH WHERE OCCURS EN (2) #4 #4 @ 16" OC MIN 9" SLAB ON GRADE PER PLAN OPTIONAL CONST JONT CLEAN & ROUGHENED SURFACE WALL STUDS PER PLAN AND DETAIL PER ARCH CURB MIN 3" #5 @ 10" OC PER PLAN #4 @ 20" OC SEE PLAN (5) #6 CONT (3) #6 CONT 2'-0" HOLDDOWN WHERE OCCURS, SEE DETAIL 1A/S6.05 ADD'L #4 U-BAR AT HOLDDOWN PER PLAN NOTE: FOR WOOD SHEAR WALL ON CONC FILLED METAL DECK, SEE DETAIL 4/S7.02 SHEAR WALL PER PLAN SLAB ON GRADE PER PLAN TREATED SILL PLATE W/ AB PER OPTIONAL CONST. JOINT CLEAN & ROUGHENED SURFACE /1 S6.06 NOTE: SEE FOR FOOTING REINF DETAIL./8 S5.01 MIN 3" SEE PLAN HOLDDOWN PER PLAN PER PLAN PER PLAN PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:26 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL CONCRETE DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S5.01 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 12" = 1'-0"1 DEVELOPMENT AND LAP SPLICE OF CONCRETE REINFORCEMENT BARS- NW CONCRETE SCALE : 1" = 1'-0"2 STANDARD HOOK DEVELOPMENT LENGTH BENDING DETAIL 1A TYPICAL LAP SPLICES 1B STAGGERED SPLICING SCALE : 1" = 1'-0"3 SLAB ON GRADE THICKENED EDGE SCALE : 1" = 1'-0"4 TYPICAL VAPOR BARRIER DETAIL 5A CURB @ SLAB ON GRADE 5B EPOXY DOWELED CONCRETE CURB SCALE : 1" = 1'-0"5 TYPICAL CURB DETAILS AT NON-SHEAR WALL SCALE : 1" = 1'-0"6 TYPICAL SLAB ON GRADE JOINTS SCALE : 1" = 1'-0"7 DEPRESSION/TRANSITION IN SLAB ON GRADE SCALE : 1" = 1'-0"8 EXTERIOR SHEAR WALL SECTION SCALE : 1" = 1'-0"9 TYPICAL INTERIOR SHEAR WALL No.Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 S S S S S S STEEL COLUMN PER PLAN COLUMN FILL AROUND COLUMN AFTER UPPER FLOORS W/ CONCRETE ARE CONSTRUCTED CONTROL JOINT TYP SEE OUTLINE OF BLOCK-OUT GRID GRID CO L U M N (TYP ) 8" MIN NOTES: 1. D = DEPTH OF FOOTING 2. S = 1'-6" MAX, UNO 3. Ld = DEVELOPMENT LENGTH 4. SEE FOR ADDITIONAL INFORMATION. NOTE: 1. SEE FOR BALANCE OF INFORMATION. /1B S5.02 /1C S5.02 WALL DOWELS WHERE OCCURS SEE PLANS FOR SIZE AND SPACING (NOT ALL SHOWN FOR CLARITY) SHEAR REINF WHERE OCCURS SEE PLANS FOR SIZE AND SPACING (NOT ALL SHOWN FOR CLARITY) FLOORLINE EL = PER PLAN FLOORLINE EL = PER PLAN REINF TO MATCH FOOTING REINF SIZE & SPACING BEND AS REQD #4 @ 18" OC (2) MINIMUM TYP 2 x S MIN TYPS MIN D TYP 3" CLR TYP 1'-6" MIN TYP 2 x S MIN FTG REINF PER PLAN D D PER Ld PER Ld TYP 0 " PER CLASS B SPLICE TYPS FTG REINF PER PLAN NOTE: 1. SEE BUILDING FOUNDATION PLAN, , FOR LOCATIONS OF STEPPED FOOTINGS. NO PIPES SHALL PASS THRU FTG UNO POUR JOINT SCHED 40 SLEEVE = PIPE DIA + 2". WHERE PVC ELEC CONDUITS ARE LAID UNDER FTG: NO ADDL SLEEVES REQD. BACKFILL PER SPECS 1 1.5 MIN NO EXCAVATION ALLOWED BELOW THIS LINE PLACE CONC FILL AROUND SLEEVES BEFORE POURING FOOTINGS. USE SAME CONC MIX AS FTG CONC PIPE TRENCH SHALL BE LOCATED SO THAT FOOTING WILL NOT BE UNDERMINED D SLAB WHERE OCCURS PIPE TO BE CENTERED IN SLEEVE PER PLAN FTG OCCURS WALL WHERE MIN D + 1'-6" MIN 6 " MIN 4 "MIN 3" MIN 9 " ELEVATION SECTION NOTES: 1. SLEEVE/PIPES/CONDUITS THAT ARE SPACED < 18", SEE DETAIL 5 & 6 /S502. 2. IF ANY CONDUITS ABOVE OR BELOW THE FOOTINGS ARE DAMAGED DURING CONSTRUCTION OR DURING THE LIFE OF THE BUILDING, THE NEED FOR SHORING OF THE EXISTING STRUCTURE SHALL BE EVALUATED AND CONSIDERED PRIOR TO REPAIR BY A LICENSED STRUCTURAL ENGINEER. 3. NO PIPE/CONDUIT SWEEPS ALLOWED IN THE FOOTING. #4 @ EA CORNER COMPETENT BEARING MATERIAL PER SOILS REPORT COLD JOINT SOG AND REINF PER PLAN STEEL COL PER PLAN BOTTOM REINF PER SCHEDULE W/ STD HOOK TYP 1' - 0" MIN TYP 3" CLR WxL PER SCHEDULE "T" PER SCHEDULE MAX 4" TO FTG EL = SEE PLAN TO FTG EL = SEE PLAN BASE PLATE DETAIL PER DETAIL 5/- ANCHOR BOLTS PER BASEPLATE DETAIL JOINTS, TYP ISOLATION 4" MAX 3" MIN DETAIL 5/- EMBED PER BASE PLATE MIN 8" TYP 3" CLR TOP REINF PER SCHED W/ STD HOOK, WHEREVER IT OCCURS /5 S7.02CLR 1"TOLERANCE 6" MAX FOR FIELD ELECT'L & ARCH'L PLANS "t" VERIFY W/ MECH'L #3 @ 12" E.W (t < 4") #4 @ 12" EW (4" < t < 6") #5 @ 12" EW (6" < t < 10") CONC SOG PER PLAN 12" 12" #4 @ 18" OC MAX ( 2 PER SIDE MIN) 3" EMBED CONC SOG PER PLAN PAD & REINF PER #4 DOWELS @ 18" OC DRILL & EPOXY 8" FOOTING SCHEDULE SIZE (WxLxT)TYPE REINFORCEMENT 7'x7'x18" 5'x5'x18" (8) #6 B EW (6) #6 B EW F1 F2 PER PLAN #6 @ 12" T&B EWF3 PER PLAN 1' - 0" MIN 8" CLR 3" SEE PLAN SOG 12" SLAB ON GRADE W/ #5 @ 12" OC EA WAY T&B, TYP 1 6 DEVELOPMENT LENGTH lD PER SCHEDULE TOP OF SLAB ELEVATION SEE PLAN #5 @ 12" OC EACH WAY WATERPROOF PER ARCH DRAIN PIPE BACKFILL PER GEOTECHNICAL REPORT WHERE OCCURS TYP 10" THK NOTE: WALL IS TO REMAIN SHORED UNTIL (7) DAYS AFTER SLAB ABOVE WALL HAS BEEN PLACED. CLR 3" TYP 2" CLR #5 @ 12" OC 3'-0" 1'-9" MIN, TYP 6" WALL/COL PER PLAN FTG PER PLAN PIPES/CONDUITS PER MEP, SCHED 40 SLEEVE, D = PIPE DIA + 2" D = 6" MAXSINGLE SLEEVE NOTES: 1. SEE FOR CONDUITS/PIPE BELOW FTG DET AND ADDL INFO NOT SHOWN. 2. VERT PENETRATIONS THAT ARE SPACED > 18" WILL BE CONSIDERED AS A SINGLE PENETRATION. /2 S5.02 5/16 Ld TYP 1" MAX 1" 1/2" TYPWF PER PLAN CONC FILLED DECK PER PLAN 1/2" THK x 8" WIDE PL (2) 3/4" Ø F1554 Gr. 36 W/ 12"-EMBED, CTR ON WALL ANGLE AND THRU-BOLT PER 8/S7.11 #5 DIAG REINF WALL'S VERT & HORIZ REINF PER PLAN PROVIDE STD HOOK FOR INTERRUPTED VERT & HORIZ REINF, TYP 1 1/2" THK NON-SHRINK GROUT 6" SCALE : 1" = 1'-0"3 BLOCK-OUT AT COLUMN & SLAB ON GRADE SCALE : 1" = 1'-0"1 STEPPED FOOTING DETAIL 1A ELEVATION 1B ELEVATION 1C PLAN VIEW SCALE : 1" = 1'-0"2 PIPE TRENCH BELOW & ADJACENT TO FOOTING DETAIL SCALE : 1" = 1'-0"4 SPREAD FOOTING DETAIL AT STEEL COLUMN SCALE : 1" = 1'-0"7 MECHANICAL PAD ON GRADE SCALE : 1" = 1'-0"7A TYPICAL SCALE : 1" = 1'-0"7B ALT PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:27 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL CONCRETE DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S5.02 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 3/4" = 1'-0"5 ELEVATOR PIT SCALE : 1" = 1'-0"6 VERTICAL PIPE/ CONDUIT THROUGH FOOTING DETAIL SCALE : 1" = 1'-0"8 WALL DETAIL AT WF POCKET No.Description Date REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 CONCRETE WALL PER PLAN DOWELS TO MATCH T&B BAR SIZE AND SPACING STRINGER & LANDING REINFORCEMENT PER SCHEDULE ON 2/- (NOSING BAR AND TREAD BAR ARE NOT SHOWN FOR CLARITY 1' - 6" MIN, TYPADD'L (2) #5, TYP SOG/PAVER PER CIVIL 12" MIN 12" MIN TYP 2" CLR #4 DOWEL INTO SIDE WALLS NOTE: SEE 1 & 2/S5.03 FOR ADDL INFO NOT SHOWN. PER ARCH PE R AR C H 8" TREAD SLAB #4 NOSING BAR, TYP #5 @ 12" OC EA WAY, T&B CONCRETE LANDING WF BEAM PER PLAN CONC FILLED METAL DECK PER PLAN T.O.SLAB PER PLAN T.O. LANDING PER PLAN NOTE: SEE ARCH DRAWINGS FOR STAIR PROFILE. 1" CLR 2' - 6" #3 @ 18" OC EACH TREAD Ls PER ARCH 10 2 S5.03 TYP PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:27 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL CONCRETE DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S5.03 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1" = 1'-0"2 TYPICAL EXTERIOR CONCRETE STAIR SECTION SCALE : 1 1/2" = 1'-0"3 CONC STAIR STRINGER BOTTOM DETAIL SCALE : 3/4" = 1'-0"1 CONC STAIR STRINGER BOTTOM DETAIL 3 No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 2 BARS TO MATCH WALL VERTICAL REINF #5 MIN 2 BARS TO MATCH WALL VERTICAL REINF #5 MIN ALTERNATE DIRECTION OF DOWEL HORIZ LEG 24" MIN. 36 db 24" MIN. 36 db PROVIDE 90 DEG. STD HOOK AT SHEAR WALL LOCATIONS DOWELS TO MATCH WALL REINF SIZE AND SPACING END CONDITION INTERSECTION CORNER PER PLAN #5 @ 12" VERT & HORIZ REINF, TYP FOR CONC SHEAR WALL W/ VERT REINF CTR ON WALL HOOK BARS 90° @ EDGE CONDITION NOTES: 1.THIS DETAIL INDICATES MINIMUM REINFORCING FOR OPENING NOT DETAILED ELSEWHERE IN THESE DRAWINGS. 2.SEE WALL ELEVATIONS OR PLANS FOR REINFORCEMENT AT LARGER OPENINGS. 3.CLUSTERS OF SMALL HOLES WHOSE OVERALL MEASUREMENT EXCEEDS 1'-0" SHOULD BE REINFORCED AS ONE OPENING, 4.NO OPENING IN SLAB TO BE LOCATED CLOSER THAN 2'-0" FROM COLUMN FACE UNLESS APPROVED BY THE STRUCTURAL ENGINEER. 5.TRIM AT EA SIDE OF OPENING TO MATCH PRIMARY REINFORCEMENT INTERRUPTED DUE TO OPENING, MIN (2) #5 EA SIDE (EF FOR WALLS, T&B FOR SLABS). 6.ANY OPENINGS NOT SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE BROUGHT TO THE SEOR'S ATTENTION BY THE CONTRACTOR PRIOR TO PERFORMING WORK. TRIM EA SIDE PER NOTE 5 (2) #4 x 3'-0" TRIM BARS EACH CORNER (OMIT AT ROUND OPNG) 2'-6" MAX 1/- Ld PER 2" CLR TYP45° PRIMARY WALL/SLAB REINFORCING PER PLAN 2'-6" MAX SLEEVE ZONE PER WALL ELEV COMPRESSIBLE FILL/WATERPROOFING PER ARCH ALL UTILITIES SHALL BE SLEEVED. SLEEVE DIA = PIPE OR CONDUIT + 2" TRIM BAR PER /---- 0" LAP LENGTH PER #1/S500 1'-0" MIN 0" LAP LENGTH PER #1/S500 WATER STOP PER ARCH KEY PER 4/S500 NOTES: 1. PRIMARY WALL REINF NOT SHOWN FOR CLARITY. 2. SEE WALL ELEVATIONS FOR ADDITIONAL REINF AT LARGER OPENINGS. 3. CLUSTERS OF SMALLER OPENINGS SHOULD BE REINFORCED AS ONE OPENING. 4. TRIM AT EACH SIDE OF OPENING TO MATCH PRIMARY WALL REINFORCEMENT SIZES UNO. ADD REINFORCEMENT TO REPLACE BARS INTERRUPTED DUE TO OPENINGS MIN (2) #5 EA SIDE, EA FACE, TYP UNO. 2'-0"ø MAX ADD (2) #4x5'-0" EA FACE, TYP SEE ALSO TYP 2" TOP OF FOOTING DOOR OPENING PER ELEV HEADER BARS #5 BAR EA FACE, MIN 1 1 TYP ADDED REINF PER NOTE 4 TYP EA SIDE EA FACE SEE ALSO MEP PENETRATIONS SEE ALSO WINDOW OPENING PER ELEV SLAB PER PLAN MAX, TYP 2' - 6" TYP LAP SPLICE TYPEQ TYPEQ TYP 2 " 2"TYP PLACE VERT BARS ADJACENT TO DOOR OPENING AS PER SHEAR WALL PARTIAL PLANS /---- /---- Ls, TYP DOWELS W/ STD HOOK TO MATCH SHEAR WALL VERTICAL REINFORCING AND SPACING, TYP SLAB ON GRADE PER PLAN PER PLAN WALL & REINF PER PLAN TOP LONGITUDINAL BARS PER PLAN TOP TRANSVERSE BAR PER PLAN TYP 2" CLR, INTENTIONALLY ROUGHEN TO 1/4" AMPLITUDE WATERSTOP PER ARCH BOT TRANSVERSE BAR PER PLAN BOT LONGITUDINAL BARS PER PLAN PER PLAN SEE 1/S5.01 LAP SPLICE PER SCHEDULE CONT FTG PER PLAN SEE 1/S5.01 Ls PER SCHEDULE DOWEL TO MATCH SHEAR WALL VERT REINF SIZE AND SPACING SLAB DOWELS TO MATCH SOG REINF CLR 3" 0", TYP PER PLAN #5 NOSING BAR WALL REINF PER / -1 CONC WALL PER PLAN NOTE: SEE FOR ADDL INFO NOT SHOWN./ -1 1 6 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:27 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 CONCRETE SHEAR WALL DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S5.11 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1" = 1'-0"1 CONC WALL DETAIL W/ SINGLE LAYER REINF SCALE : 1" = 1'-0"2 CONCRETE WALL / SLAB OPENING DETAIL SCALE : 1" = 1'-0"3 CONDUIT/PIPE CLUSTER WALL PENETRATION SCALE : 1" = 1'-0"4 TYP WALL VERTICAL CONSTRUCTION JOINT SCALE : 1/2" = 1'-0"5 MINIMUM ADDED TRIM REINFORCEMENT AT WALL OPENINGS DOOR LESS THAN 6-FT WIDE AND OPNIINGS LESS THAN 2'-0" SCALE : 1" = 1'-0"6 SECTION VIEW AT FOOTING - CIP WALL No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 SCALE : 1" = 1'-0"7 DETAIL 3 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 DIAPHRAGM SCHEDULE SPAN RATINGMIN NOMINAL PANEL THICKNESS 15/32" TYPE A LOCATION ROOF SHEATHING EDGE SQUARESTRUCTURAL 1 SHEATHING GRADE BOUNDARY NAILING (BN) C-D VENEER GRADE 10d @ 6" OC BOND CLASS EXPOSURE 1 MIN ROOF FRAMING EDGE NAILING AT PANEL EDGES (EN) FIELD NAILING (FN) CAPACITY (PLF, LRFD) NOTES: 1. NOT USED. 2. MINIMUM PLYWOOD WIDTH IS 24" 3. PLYWOOD SHALL BE CONTINUOUS OVER 2 JOIST BAYS, MIN & 5 PLY. 4. NAILS SHALL BE DRIVEN TIGHT TO TOP OF PLYWOOD SURFACE AND IN NO CASE SHALL NAILS PENETRATE THE TOP PLY MORE THAN COMMONLY EXPECTED WITH HAMMER DRIVEN NAILS. NAILS OVERDRIVEN ARE SUBJECT TO REJECTION AND MAY RESULT IN REMOVAL OF PLYWOOD AND LUMBER FRAMING TO WHICH IT IS FASTENED. ACCEPTANCE IS AT THE DESCRESSION OF THE SEOR AND SPECIAL INSPECTOR. 5. MINIMUM EDGE DISTANCE FOR NAILS SHALL BE 3/8" FROM SHEATHING EDGE AND 3/8" FROM LUMBER EDGE. 6. FRAMING AT ADJOINING PANEL EDGES SHALL BE 3" NOMINAL OR WIDER, AND NAILS AT PANEL ALL PANEL EDGES SHALL BE STAGGERED WHERE PANEL EDGE NAILING IS SPECIFIED LESS THAN 2 1/2" O.C. 7. PROVIDE BOUNDARY NAILS AT ALL DRAG BEAMS AND SHEARWALL LOCATIONS. 8. SEE DETAIL FOR FULL HT BLKG DETAIL. 2x / BLOCKED 10d @ 6" OC 10d @ 6" OC 51232/16 LINES OF FASTENERS 1 /8 S6.01 BN PER SCHED AT SHEARWALL LINES STAGGER PANEL JOINTS PROVIDE 2x4 FLAT BLKG AT ALL SHTHG EDGES NOT SUPPORTED BY FRAMING WHERE REQ'D PER SCHEDULE (USE 3x4 FOR SHEATHING TYPE B) JOISTS PER PLAN EDGE NAILING AT PANEL EDGES TO JOIST TYPICAL UNO PER SCHEDULE FIELD NAILING TO INTERMEDIATE JOIST TYPICAL UNO PER SCHEDULE BLOCKING PLYWOOD PER SCHEDULE, AXIS PERP TO JOISTS, TYP PLYWOOD PANEL EDGES EDGE NAILING TO BLKG AT PANEL EDGES WHERE REQ'D PER SCHEDULE 2-JOIST BAYS MIN PER NOTE MIN WIDTH 1B OPENING "D" FOR "D" = 2'-6" MAX, USE (2) JOIST FOR "D" = 4'-0" MAX, USE (3) JOIST NOTE: 1. FOR LARGER OPENINGS REFER TO PLANS FOR FRAMING CL J O I S T C L J O I S T DOUBLE JOIST TRIMMER JOIST HANGERS, TYP SLOPED BLKG PER , SIM P1000 W/ (3) 3/8"x2" LAG SCREW P1068 200# MAX /10 S6.01 NOTES: 1. NOTCHING AND BORING NOT PERMITTED IN THE SAME JOIST SECTION WITHOUT STRUCTURAL ENGINEER'S APPROVAL. 2. NOTCHING NOT PERMITTED IN MIDDLE-THIRD OF JOIST SPAN. 3. NOTCH WIDTHS GREATER THAN SHOWN ABOVE ARE NOT PERMITTED WITHOUT STRUCTURAL ENGINEER'S APPROVAL. 4. FOR BEAM WIDTHS > 3.5" OR GLU-LAM BEAMS, SEE BORING OF BEAMS DETAIL. 5. FOR JOISTS SPACED > 24" OC, BORING AND NOTCHING REQUIRES STRUCTURAL ENGINEER'S APPROVAL. 6. DO NOT NOTCH OR BORE 2x4 JOISTS. JOIST SIZE 2x6 / 4x6 1 3/4" 2 3/8" 7/8"x1 3/4" MAX BORE DIA "d" MAX NOTCH DEPTH x WIDTH 2x8 2x10 1"x2 3/8" 1 1/2"x3"3" 2x12 1 7/8"x3 3/4"3 3/4" D/6 MAX "D" JOIST DEPTH D/6 MAX 2" MIN MIDDLE 1/3 SPAN D/3 MAX 2" MIN SUPPORT D/4 MAX AT . HOLE DIA . GREATER OF 8x LARGER HOLE DIA AND JOIST DEPTH COLUMN PER PLAN SIMPSON ECCOQ POST CAP UNO END CONDITIONB PSL, LSL, LVL BM OR GLB, SEE PLAN 3/16 TYP 4 SIDES COLUMN PER PLANSIMPSON CCOQ POST CAP, UNO INTERIOR CONDITIONA PSL, LSL, LVL BM OR GLB, SEE PLAN 3/16 TYP 4 SIDES PLYWOOD SHEATHING JOIST PER PLAN, TYP 2x OR 3x MIN BLOCK TO MATCH JOIST DEPTH SEE NAILING SCHEDULE PER 1 4X FULL DEPTH BLKG PER 8/- NOTES: 1. NOT MORE THAN ONE CONNECTION PER BLKG. 2. THIS DETAIL IS APPLICABLE TO BRACE PARALLEL & PERPENDICULAR TO JOISTS. 3. ALLOWABLE LOADS ARE BASED ON SCREW WORKING CAPACITY. MEP SHALL VERIFY SEISMIC BRACE AND ANGLE BRACKET CAPACITY W/ MANUF. 1/8"Ø G.A.C. W/ (2) CLAMPS PER MECH P1000 UNISTRUT W/ P1843 ADJUSTABLE HINGE P2= 200# M AX P3= 200 # M AX 1 BN 5/8" MAX 12 GA CLIP x 3" x 3" (LLV) x 0' - 3" LONG W/ (2) 1/4"Ø x 1 3/8" WOOD SCREWS (2) 1/4"Ø x 1 3/8" WOOD SCREW P2= 200# M AX ANGLE BRACE PER MECH W/ P1843 ADJUSTBLE HINGE U410 HANGER EA SIDE BRACE & FASTERNERS PER BRACE PERPENDICULAR TO JOIST, SIM FLOOR JOIST, TYP PLYWOOD SHEATHING BRACE PERPENDICULAR TO JOIST BRACE PARALLEL TO JOIST MAX 15.00° MAX D/3 ROOF JOIST, TYP NOTES: 1. NOT MORE THAN ONE CONNECTION PER BLKG. 2. MEP HANGER CAN BE INSTALLED DIRECTLY TO ROOF BEAMS IF BEAM NOMINAL THICKNESS IS EQUAL OR GREATER THAN THICKNESS OF CONNECTING BLOCKING SHOWN ON THIS DETAILS. 3. RAISE BLOCK ELEVATION AS REQUIRED TO HIDE CONNECTION HARDWARE ABOVE ARCHITECTURAL CEILING. 4. FOR SLOPED HANGER SEE . 3/8"Ø EYELAG W/ 3" EMBED W/ 1/8"Ø G.A.C. W/ (2) CABLE CLAMPS 4x6 BLKG W/ SIMPSON HUS46 EA END TYP ROOF JOIST PER PLAN, TYP METAL STRAP PER MECH W/ 3/8"Ø BOLT P2682 W/ (2) 1/4"Ø x 1 3/8" WOOD SCREWS INTO 4x W/ 1/2"Ø THREADED ROD W/ DBL NUT (NOTE: @ 5/8"Ø ROD, PROVIDE COUPLING NUT REDUCER 5/8" TO 1/2" WHERE OCCURS) 200# MAX 200# MAX 2" 1 1/2" 200# DUCT ANGLE SUPPORT PER MECH200# MAX 5/8" EQEQ 12 GA CLIP x 3" x 3" (LLV) x 0' - 3" W/ (2) 1/4"ø x 1 3/8" WOOD SCREWS 1 1/2" APART JOIST WEB FILLER EA SIDE, TYP. 3" MIN TYP ROOF SHEATHING PER PLAN (2) 1/2"Ø LAG SCREWS W/ 3" EMBED SEE NOTE 3 150# MAX UNISTRUT P1458 ANGLE CLIP W/ (2) 3/8" DIA x 2" LAG SCREWS W/ NUT AND WASHER AT THREADED ROD /4 S6.01 MIN 1 1/2" SIMPSON HCCTA9-7 H = 33" W/ (2) ROTATION BOLTS PER BEAM (USE HCCTA5.62-5 AT GRID 2/A.5) GLULAM BEAMS PER PLAN COLUMN OR WALL PER PLAN 2' - 0" MAX P1068 BNPLYWOOD DRAG BEAM TYPICAL FRAMING NOT SHOWN FOR CLARITY SHEARWALL OR COLLECTOR BEAM JOIST OR BLKG BLOCKING EN BN SCALE : 1" = 1'-0"1 TYPICAL PLYWOOD ROOF SHEATHING 1A PLYWOOD NAILING DETAIL SCALE : 1" = 1'-0"2 NOT USED SCALE : 1" = 1'-0"3 FRAMING AT OPENING SCALE : 1" = 1'-0"4 HANGER AT SLOPED BLKG SCALE : 1" = 1'-0"5 NOTCHING AND BORING OF JOISTS SCALE : 1" = 1'-0"7 WOOD BEAM TO HSS COLUMN SCALE : 1 1/2" = 1'-0"8 JOIST FULL DEPTH BLOCK SCALE : 1 1/2" = 1'-0"9 MEP BRACES TO WOOD FRAMING SCALE : 1 1/2" = 1'-0"10 MEP HANGERS TO WOOD FRAMING SCALE : 1" = 1'-0"11 GLULAM SPLICE CONNECTION PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:28 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL WOOD DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.01 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB 1B DIAPHRAGM NAILING SECTION No. Description Date REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 NOTES: 1. NOTCH AND BORING NOT PERMITTED IN THE SAME SECTION OF STUD. 2. NO MORE THAN 2 SUCCESSIVE DOUBLE STUDS ARE PERMITTED TO HAVE 60% MAX BORED HOLES. 3. ALL NOTCHES IN EXTERIOR & BEARING STUDS BIGGER THAN 40% SHALL BE REPAIRED BY SIMPSON HSS, AND SS STUD SHOE. 4. ALL HOLES SHALL BE DRILLED WITH A HOLE SAW. NOTCH 40% MAX STUD WIDTH ALL STUDS 5/8" MIN, TYP EDGE DISTANCE NON-BEARING STUDS NOTCHES AND HOLES IN EXTERIOR & BEARING STUDS 60% MAX STUD WIDTH BORE ALLOWABLE WIDTH OR DIAMETER OF NOTCH OR BORED % OF STUD NOTCHED OR BORED 25% 40% 60% 7/8" 1 3/8" 2" 1 3/8" 2 1/8" 3 1/4" 2x4 2x6 CL WALL & HOLE 2x4 40% MAX STUD WIDTH BORE. (60% OF STUD WIDTH IS ALLOWED IF EACH BORED STUD IS DOUBLED. SEE NOTE 2 BELOW) REPAIR HOLES BIGGER THAN 40% WITH SIMPSON HSS/SS. 2 3/4"ø MAX HOLE SIZE 2x6 SS STUD SHOE HSS STUD SHOE 40% MAX STUD WIDTH BORE. (60% OF STUD WIDTH IS ALLOWED IF EACH BORED STUD IS DOUBLED. SEE NOTE 2 BELOW) REPAIR HOLES BIGGER THAN 40% WITH SIMPSON HSS/SS. 2"ø MAX HOLE SIZE ALL STUDS 5/8" MIN TYP EDGE DISTANCE STUDS, SEE PLAN & SCHEDULE CL PIPE OR NOTCH CONTINUOUS 2-2x TOP PLATES NOTES: 1. HOLES AND SOLE SHALL BE MADE W/ HOLE SAW. 2. SEE DETAILS 13 & FOR BALANCE OF INFORMATION. BLKG EA SIDE OF PIPE, TYP CONTINUOUS 2x MIN SOLE PLATE WHERE OCCURS AT SHEAR WALLS SEE SHEAR WALL SCHEDULE /14 S6.02 1. ALL SILL PLATES SHALL BE PRESSURE TREATED D.F. OR REDWOOD, SEE GENERAL NOTES. 2. WIDTH 'd' SHALL BE EQUAL TO DEPTH OF STUDS, U.N.O. 3. FOR ANCHOR BOLTS, SEE SHEAR WALL ELEVATIONS AND SHEAR SCHEDULE ON . 4. ANCHOR BOLTS AND PLATE WASHERS SHALL BE GALVANIZED, SEE GENERAL NOTES. 5. EACH SILL PIECE SHALL HAVE 2 BOLTS MINIMUM. LOCATE BOLTS CLEAR OF STUDS AND POSTS. 6. 'A' DIMENSION SHALL BE 5" MIMIMUM AND 9" MAXIMUM. 7. NO BORED HOLES OR NOTCHES PERMITTEN IN 4" SHEAR WALLS. A A A A .A SPACING TYP A.B. A SEE NOTE 4 d/2 TYP A A A A NOTCH 2'-0" MIN1'-0" MIN NOTES: 1. HOLES AND SOLE SHALL BE MADE W/ HOLE SAW. 2. FOR BALANCE OF INFO SEE DETAIL ./13 S6.02 /1 S6.06 3 TYP DUCT AT NON-BEARING WALLS ONLY. NOT PERMITTED IN BEARING WALLS 1. ALL SILL PLATES SHALL BE PRESSURE TREATED D.F. OR REDWOOD, SEE GENERAL NOTES. 2. WIDTH 'd' SHALL BE EQUAL TO DEPTH OF STUDS, U.N.O. 3. AT NON-BEARING WALLS, L.V.P SHALL BE 0.177"Øx 3 1/4" HILTI 'X-U' AT 16"OC, TYP. AT BEARING WALLS, ANCHOR BOLTS, SHALL BE 5/8" WITH 5" EMBEDMENT AND SIMPSON BP PLATE WASHERS SPACED AT 4'-0" OC MAX, UNO. 4. L.V.P. AND ANCHOR BOLTS SHALL BE GALVANIZED OR STAINLESS STEEL, SEE GENERAL NOTES. 5. AT NON-BEARING WALLS EACH SILL PIECE SHALL HAVE 3 L.V.P. MINIMUM. LOCATE L.V.P. CLEAR OF STUDS AND POSTS. AT BEARING WALLS EACH SILL PIECE SHALL HAVE 2 BOLTS MINIMUM. LOCATE BOLTS CLEAR OF STUDS AND POSTS. 6. 'A' DIMENSION SHALL BE 5" MIMIMUM AND 9" MAXIMUM. A A A A MAX 6" MAX A A MAX 1' - 2" A SPACING TYP A.B. A 1'-6" MIN 2'-0" MIN1'-0" MIN A A NOTCH NOTES: 1. HOLES AND SOLE SHALL BE MADE W/ HOLE SAW. 2. FOR BALANCE OF INFO SEE DETAIL ./14 S6.02 3 1/3 DEPTH 1/3 DEPTH 1/3 DEPTH 1/3 SPAN ALLOWED HOLE ZONE 1/3 SPAN 1/3 SPAN HOLE ZONE ALLOWED (MINIMUM) 3x Ø OF THE LARGEST HOLE CL CL NOTES: 1. THE ALLOWED HOLE ZONE IN THIS CHART IS SUITABLE FOR UNIFORMLY LOADED BEAMS HOLES NOT ALLOWED IN BEAMS SUPPORTING OTHER BEAMS W ITHOUT ENGINEER'S APPROVAL. 2. MAXIMUM HOLE SIZE IS 2" DIAMETER OR A HOLE DIAMETER EQUAL TO 1/6 THE BEAM DEPTH WHICHEVER IS SMALLER. 3. RECTANGULAR HOLES ARE NOT ALLOWED. 4. HOLES IN CANTILEVERS OR MULTISPAN BEAMS SHALL NOT BE PERMITTED WITHOUT ENGINEERS APPROVAL. 5. DO NOT STACK HOLES VERTICALLY. 6. NOTCHING OF BEAMS NOT PERMITTED WITHOUT STRUCTURAL ENGINEER'S APPROVAL. POST OR BEARING WALL PER PLAN, TYP CL CL 16d AT 12"OC, TYP DOUBLE TOP PLATE SPLICE TOP PLATE SPLICE BOTTOM PLATE 8-16d NAILS EACH SIDE OF PLATE JOINT, TYP 4'-0" MIN LAP 2" TYP LAP TO OCCUR OVER STUD, TYP CL CL CONTINUOUS DOUBLE TOP PLATE SPLICE TOP PLATE SPLICE BOTTOM PLATE 16d AT 12"OC, AT 2x4 TOP PLATES 16d AT 6"OC, STAGGERED AT 2x6 TOP PLATES AND LARGER 12-16d NAILS AT 2x4 TOP PLATES 18-16d NAILS AT 2x6 TOP PLATES AND LARGER EACH SIDE OF PLATE JOINT, TYP ALT TOP PL SPLICE PER LAP TO OCCUR OVER STUD, TYP TYP 2" 4'-0" MIN LAP PLAN VIEW ELEVATION /7 S6.02 SIMPSON LSTA18 EA SIDE OF DOUBLE TOP PLATES TOP PL SPLICE LOCATION EQ EQ SCHEDULE TOP PL OR SILL PL SIZE A 2x4 3 1/2" FLOOR SHTHG, JOIST AND RIM JOIST NOT SHOWN FOR CLARITY PLYWOOD SHEATHING PER SHEARWALL SCHEDULE STRAP AT PIPE OR NOTCH CONT SOLE PLATE CONT DBL TOP PLATE "A" MIN 1' - 0" MIN 1' - 0" TOP OR SOLE PLNOTCHES MIN 6'-0" OC "C1" MAX WITHOUT STRAPS "C2" MAX @ 4'-0" OC MIN W/ SIMPSON CT218 W/ (12) 10d EA END @ EA PL, BOTH SIDES SIMPSON CTS218 W/ (12) 10d EA END @ EA PL "B" "D" C1 B C1 C2 D 2x6 4 1/2" 2x8 5 1/2" PLAN VIEW SECTION NOTES: 1. HOLES SHALL BE MADE W/ HOLE SAW. 2. WHERE PENETRATIONS EXCEED SPECIFIED DIMENSIONS DETAIL CAN BE USED. 1 1/2" 2 1/4" 3" 1" Ø 1 1/2" Ø 3" Ø 1 1/2" Ø 3 1/2" Ø 5" Ø 1 3/4" 2 1/2" 3 1/4" /10 S6.02 5 1/2" N.P.2x4 2x6 SILL PL SIZE TOP PL OR A 2" SCHEDULE B C 2 1/2" 1 1/2" D DBL TOP OR SILL PL 1 1/4" x 16 GA MIN LONG STRAP W/ (6)10d COMMON NAILS EA END @ EA PL NOTCHES MIN 6'-0" OC N.P. 1"Ø 1 1/2" Ø 3 1/2"Ø 1 C 2 2"Ø "C " MAX WITHOUT STRAPS "C " MAX @ 3'-0" OC MIN W/ 1 1/4" x 16 GA "E" MIN LONG STRAPS W/ (6) 10d EA END @ EA PL, BOTH SIDES 1 2 SECTION 21" 15" E NOTES: 1. HOLES SHALL BE MADE W/ HOLE SAW. 2. WHERE PENETRATIONS EXCEED SPECIFIED DIMENSIONS DETAIL CAN BE USED. PLYWOOD SHEATHING WHERE OCCURS CONT SILL PL STRAP AT PIPE OR NOTCH CONT DBL TOP PL C1 "A"1'-0" MIN 1'-0" MIN "D" B /9 S6.02 PLYWOOD SHEATHING WHERE OCCURS NOTES: 1. FOR USE WHERE PENETRATIONS DESTROY THE INTEGRITY OF TOP PLATES. 2. USE ALL SPECIFIED FASTENERES. 3. FASTENER QUANTITY IS THE NUMBER OF 6D COMMON NAILS TO BE INSTALLED INTO EACH OF THE MEMBERS TO BE JOINED. 4. CAN BE INSTALLED OVER THE TOP OR FROM THE UNDERSIDE OF THE TOP PLATES. 5. FOR WALL DEPTHS GREATER THAN 3-1/2", OR TO INSTALL AFTER PLUMBING LINES HAVE BEEN RUN, CAN BE SEPARATED INTO TWO "L" SHAPES ALONG THE SERRATION LINES. 6. ALLOWABLE TENSION LOADS ARE FOR NORMAL DURATION, THE VAULES MAY BE ADJUSTED FOR OTHER DURATIONS. 7. THE PRODUCT AND INSTALLATION SHALL COMPLY WITH LARR# 25759. USP STOCK NO. HFS24 3 5/8"24" DIMENSIONS (in) FASTENER SCHEDULE DF/SP ALLOWABLE LOADS (lbs)1,3 W L QTY TYPE2 4 TENSION 100% 24"16d COMPRESSION 100% 2950 2500 HFS36 3 5/8"36"32"16d 4280 2500 OMIT FASTENERS AT THESE HOLES WHEN THE END DISTANCE IS LESS THAN 1" 4 1/2" MAX STUD/CRIPPLE STUD PER PLAN T.O. DBL PLATES AND B.O. JOISTS BEAM PER PLAN SIMPSON A34 CLIP, TYP 6x BLK, WIDTH TO MATCH STUD WALL NOTES: 1. SEE 2/S6.03 FOR ADDL INFO NOT SHOWN. 2. SEE MFR FOR PARTITION'S TRACK, HANGER AND BRACE INFO AND REQUIREMENT. PL 1/2" X (STUD WALL WIDTH) X 0'-11 1/2" PL 1/2" W/ (2) 1/2"Ø LAG SCREWS INTO BLOCKING W/ 4" MIN PENTRATION & (2) 1 1/2" LONG SLOTTED HOLES 1" 4 3/4" 4 3/4" 1" 4" EQ EQ 1 1/2" 1 1/2" 1/2" MAX CL S C R E W S PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:29 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL WOOD DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.02 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1" = 1'-0"10 HOLES OR NOTCHES IN STUDS SCALE : 1" = 1'-0"8 TOP PLATE STRAP AT PIPE/NOTCH SCALE : 1" = 1'-0"2 SILL PLATE AT SHEAR WALL DETAIL SCALE : 1" = 1'-0"1 SILL PLATE AT NON-SHEAR WALL DETAILS SCALE : 1" = 1'-0"12 BORING OF BEAMS SCALE : 1" = 1'-0"5 NON-BEARING WALL TOP PLATE SPLICE SCALE : 1" = 1'-0"6 BEARING AND SHEARWALL TOP PLATE SPLICE SCALE : 1" = 1'-0"7 ALT TOP PLATE SPLICE @ SHEARWALL SCALE : 1" = 1'-0"13 TYPICAL NOTCHING AND BORING OF TOP PLATE AT SHEARWALLS SCALE : 1" = 1'-0"14 TYPICAL NOTCHING AND BORING OF TOP OR SILL PLATE AT NON-SHEAR WALLS 7A SECTION SCALE : 1" = 1'-0"9 HARDY FRAME SADDLE No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 3 SCALE : 1" = 1'-0"3 OPERABLE PARTITION STEEL BEAM SUPPORT CONN 3A ELEVATION 3B PLAN VIEW 3 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 2x82x6 STUD SIZE 16d AT 12"o.c., TYP 2-4x10 2-4x8 2-4x66x63'-0" MAX 5'-0" MAX 8'-0" MAX 2x4 4x6 4x14 4x10 6x8 5 1/4 x 9 1/4 PSL OR 6x12 FULL DEPTH HEADER ALTERNATE 6-16d EA END AT EXT OPENINGS > 5'-0" HEADER MEMBER ON EDGE, SEE TABLE BELOW FOR SIZE 1 JACK STUD FOR OPNGS ≤ 5'-0" 2 JACK STUDS FOR OPNGS ≤ 8'-0" SAME SIZE AS WALL STUDS, U.N.O. CRIPPLE STUDS 4-16d EACH END U.N.O. 2-10d TOE NAILS EACH END FULL HEIGHT KING STUD 2-STUDS AT OPENINGS > 5'-0" (ADD ADDITIONAL KING STUD FOR EA LEVEL OF FRAMING ABOVE WHERE JAMBS STACK) WIDTH OF OPENING NOTES: 1. HEADERS NOTED IN TABLE SHALL BE PROVIDED OVER ALL WINDOW, DOOR, AND OTHER OPENINGS, UNLESS NOTED OTHERWISE ON PLANS AND SPECIFIC DETAILS. A FULL DEPTH HEADER MAY BE USED IN LIEU OF THE HEADERS NOTED IN THE TABLE. IF A FULL DEPTH HEADER IS USED, THE CRIPPLE STUDS MAY BE OMITTED. 7 S6.03 OVER 10'-0" SEE PLAN AND SPECIFIC DETAILS 2-4x12SEE PLAN & SPECIFIC DETAILS 6x1410'-0" MAX 2x6 2x6 NOTE: FOR HEADER, SEE SCHEDULE CRIPPLE STUDS WHERE IT OCCURS TYPICAL U.N.O. CONTINUOUS DOUBLE TOP PLATES, TYPICAL JACK STUD BEYOND TYPICAL HEADER TYPICAL PLYWOOD SHIMS 2x4 PLYWOOD SHIMS 2-2x4 or 4x4 2-2x6 or 4x6 2-2x8 or 4x8 3-2x4 or 6x6 3-2x6 or 6x6 3-2x8 or 6x8 2x4 2x6 SEE SPECIFIC DETAILS 3'-0" MAX 5'-0" MAX 8'-0" MAX OVER 8'-0" NOTES: 1. HEADERS NOTED IN TABLE SHALL BE PROVIDED OVER ALL WINDOW, DOOR, AND OTHER OPENINGS, UNLESS NOTED OTHERWISE ON PLANS AND SPECIFIC DETAILS. A FULL DEPTH HEADER MAY BE USED IN LIEU OF THE HEADERS NOTED IN THE TABLE. IF A FULL DEPTH HEADER IS USED, THE CRIPPLE STUDS MAY BE OMITTED. 2. IF 6x12 CONTINUOUS ROM BEAM IS PRESENT ABOVE OPENING, HEADER MAY BE FRAMED WITH 2-2x4 AND CRIPPLE STUDS ABOVE. CRIPPLE STUDS 4-16d MINIMUM EACH END 2-10d TOE NAILS EACH END FULL HEIGHT KING STUD 2-STUDS AT OPENINGS > 5'-0" HEADER MEMBER ON EDGE, SEE TABLE BELOW FOR SIZE 1 JACK STUD, SAME SIZE AS WALL STUDS, UNLESS NOTED ON PLAN 16d AT 12"o.c. WIDTH OF OPENING STUD SIZE 16d AT 12"o.c.,TYP 6x12 TYP, UNO ON PLAN 1- FULL HEIGHT KING STUD JACK STUDS AT ROOF: 1 STUDS FOR OPENINGS < 5'-0" 2 STUDS FOR OPENINGS < 8'-0" SAME SIZE AS WALL STUDS, UNO JACK STUDS AT FLOORS BELOW: ADD ADDITIONAL JACK STUD FOR EA LEVEL OF FRAMING ABOVE NOTES: 1. HEADERS NOTED SHALL BE PROVIDED OVER ALL WINDOW, AND DOOR OVER BALCONIES, UNLESS NOTED OTHERWISE ON PLANS AND SPECIFIC DETAIL 2. THIS DETAILS ONLY APPLIES TO 6" EXTERIOR WALL 3. ALL EXTERIOR WALL FRAMING MEMBERS TO BE FIRE TREATED. 4. WHERE FULL WIDTH/DEPTH CONTINUOUS RIM BEAM IS PROVIDED OVER THE OPENING, HEADER CAN BE OMITTED. JAMB STUD QUANTITY AND CONNECTIONS TO MATCH JACK STUD SCHEDULE AS SHOWN. A35'S @ TOP TYP 6-16d EA END 8'-0" MAX LS1, NS2SIMPSON STRAP TIE PER PLAN & SCHEDULE ON S2.3 EXTERIOR FRAMING PER S6.16 LS1, NS1 PERPENDICULAR TO JOISTS CLR 1/2" MIN PLY SHTG JOISTS SIMPSON DTC @ 48" OC (NAIL SHALL BE INSTALLED IN THE MIDDLE OF SLOT) WALL STUDS PER PLAN PARALLEL TO JOISTS CLR 1/2" MIN SIMPSON DTC @ 48" OC (NAIL SHALL BE INSTALLED IN THE MIDDLE OF SLOT) JOIST 2x4 @ 4'-0" W/ (2) 16d EA END WALL STUDS PER PLAN CLR 1/2" MIN SIMPSON DTC @ 48" OC (NAIL SHALL BE INSTALLED IN THE MIDDLE OF SLOT) FULL DEPTH 2x BLKG EA SIDE @ 48" OC JOISTS WALL STUDS PER PLAN NOTE: 1. DO NOT INSTALL NON-BEARING PARTITIONS UNTIL DEAD LOAD IS IN PLACE. (WHERE APPROPRIATE DEFLECTION SPACE HAS BEEN PROVIDED FOR THIS REQUIREMENT MAY BE WAIVED). SEE PLANS AND SPECIFIC DETAILS 2x4 1-2x43'-0" MAX 5'-0" MAX 8'-0" MAX OVER 10'-0" 2-16d 2-2x4 3-2x4 2x6 1-2x6 2-2x6 3-2x6 2x8 1-2x8 2-2x8 3-2x8 2-16d AT 16"OC SILL MEMBER (FLAT) SEE TABLE BELOW FOR SIZE ONE JACK, SAME SIZE AS STUD, UNLESS NOTED ON PLAN WIDTH OF OPENING STUD WIDTH SIZE 2-16d EA 2x MINIMUM FULL HEIGHT KING STUD SEE HEADER SCHEDULE 10'-0" MAX 4-2x4 4-2x6 4-2x8 WALL ABOVE WHERE OCCURS BEAM SEE PLAN BEAM EDGE NAILING HANGER, TYPICAL SEE SCHEDULE 1 3/4" x 11 1/4" TOP FLANGE MIT11.88 FACE MOUNTED HU11 SIMPSON DESIGNATIONS TYPE EGQ3.62 - SDS3 HGU3.63 - SDS EGQ5.50 - SDS3 HGU5.5 - SDS EGQ7.25 - SDS3 HGU7.25 - SDS 3 1/2" x 11 1/4" 5 1/4" x 11 1/4" 7" x 11 1/4" NOTES: 1. INSTALL PER MANUFACTURER'S INSTRUCTIONS. FILL ALL HOLES WITH FASTENERS SPECIFIED FOR MAXIMUM LOADS. 2. USE SKEWED OR SLOPED HANGERS AS REQUIRED. 3. HANGERS ARE TYPICAL UNI IN DRAWINGS. 4. SEE FOR I-JOIST HANGER SCHEDULE/2 S6.21 3 2x82x6 STUD SIZE 8x 'd' 8x 'd' 8x 'd'6x 'd'3'-0" MAX 5'-0" MAX 8'-0" MAX OVER 8'-0" 2x4 4x 'd' 4x 'd' 4x 'd' SEE PLAN AND SPECIFIC DETAILS 6x 'd' 6x 'd' NOTES: 1. HEADERS NOTED IN TABLE SHALL BE PROVIDED OVER ALL WINDOW, DOOR, AND OTHER OPENINGS, UNLESS NOTED OTHERWISE ON PLANS AND SPECIFIC DETAILS. 2. 'd' TO MATCH FLOOR FRAMING DEPTH. WIDTH OF OPENING 2-4-16d EA END16d AT 12"OC, TYP 2 STUDS FOR OPNGS ≤ 5'-0" 3 STUDS FOR OPNGS ≤ 8'-0" 4 STUDS FOR OPNGS ≤ 10'-0" SAME SIZE AS WALL STUDS, U.N.O. A35 @ FILLER SEISMIC STRAP PER ,TYP .PERPENDICULAR JOISTS PER PLAN WHERE OCCUR FILLER FRAMING AS NEEDED PLYWOOD SHEATING PER PLAN BEAM PER PLAN 2-2x CONT TOP PL A35 EA SIDE PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:30 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL WOOD DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.03 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1" = 1'-0"2 HEADER SCHEDULE (BEARING) SCALE : 1" = 1'-0"7 TYPICAL HEADERS SCALE : 1" = 1'-0"1 HEADER SCHEDULE (NON-BEARING) SCALE : 1" = 1'-0"3 DROPPED HEADER SCALE : 1" = 1'-0"10 NON-BEARING PARTITION TOP PL CONN SCALE : 1" = 1'-0"6 SILL SCHEDULE SCALE : 1" = 1'-0"8 SECTION AT BEAM CONNECTION SCALE : 1" = 1'-0"9 SAWN LUMBER BEAM HANGER SCHEDULE SCALE : 1" = 1'-0"4 FLUSH HDR SCHED - EXTERIOR WALL SCALE : 1" = 1'-0"5 TYP FLUSH BEAM PERPENDICULAR TO WALL No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 LAP PLATES AT ALL INTERSECTIONS AND CORNERS AND PROVIDE 4-16d AT EACH LAP, SEE DETAIL PROVIDE BUILT-UP 3 STUD ASSEMBLY AT EXTERIOR CORNERS AND AT ALL WALL INTERSECTIONS W/ 16d AT 24"OC INTERNAILING PROVIDE MULTIPLE STUDS OR POSTS UNDER ALL BUILT- UP JOISTS OR BEAMS TO MATCH WIDTH OF JOISTS, BEAMS, OR RAFTERS ABOVE 9" MAX END DISTANCE FOR ALL FASTENINGS (MIN OF 2 FASTENERS PER PIECE OF SILL) HEADER, SEE PLAN AND DETAIL 16d AT 12"OC TYPCIAL AT ALL MULTIPLE STUDS 2x SOLID BLOCKING FOR WALLS OVER 10'-0" HIGH W/ 2-10d TOE NAIL EACH END 4'-6"OC MAX SPACING UNO 2-16d END NAILS, MIN (TYP TOP & BOTTOM) U.N.O. NOTE: CUTTING, NOTCHING, OR BORING OF STUDS OR PLATES SHALL COMPLY WITH DETAILS ON . CONCRETE CONDITION WALL HEIGHT 'H' AT HOLES IN TOP PLATES SEE DETAIL FLUSH BM SEE PLAN & SCHEDULE DETAIL SEE DETAIL 4'-0" MIN LAP FOR SPLICE 16d AT 12"OC MAX, U.N.O. LAP END TO OCCUR OVER STUD (TYPICAL) EXTERIOR WALL FLUSH HEADER, SEE PLAN & SCHEDULE DETAIL HEADER, SEE PLAN AND DETAIL 16d AT 12"OC TYPCIAL AT ALL MULTIPLE STUDS SILL, SEE PLAN AND DETAIL ANCHOR BOLTS & SIMPSON BP PLATE WASHERS SEE DETAIL CONT 2x MIN SILL PLATE SEE GENERAL NOTES AT SHEAR WALLS SEE SHEAR WALL SCHEDULE 2x, 3x OR 4x STUDS AT 16"OC MAX TYPICAL, U.N.O., PER WALL SCHEDULE POST, SEE PLAN DOUBLE KING STUDS WHERE REQUIRED SEE DETAILS FOR HOLES IN STUDS SEE DETAIL CONTINUOUS 2x MIN SOLE PLATE W/ 16d AT 8"OC MAX AT SHEAR WALLS, SEE SHEAR WALL SCHEDULE A35'S @ POSTS, TYP 2 BAY 2x SOLID BLKG AT DOORS TYP /6 S6.03 /10 S6.03 /2 S6.03 /6 S6.02 /2 S6.02 /8 S6.02 S6.02 INTERIOR WALL STUD SCHEDULE (NON-BEARING) MAX HEIGHT 'H'INTERIOR WALL STUD SPACING U.N.O. H < 12'-6" H < 18'-0" 2x4 @ 16" OC 2x6 @ 16" OC NOTE: 1. FOR JACK STUDS AND KING STUDS, SEE HEADER SCHEDULE. 2. THESE WALLS SHALL HAVE AT MIN 1 LAYER OF 5/8" GYP BOARDS ON BOTH SIDES. PROVIDE BUILT-UP (3) STUDS ASSEMBLY AT EXTERIOR CORNERS AND AT ALL WALL INTERSECTIONS w/ 16d AT 24"OC INTERNAILING LAP PLATES AT ALL INTERSECTIONS AND CORNERS AND PROVIDE 4-16d AT EACH LAP, SEE DETAIL AT HOLES IN TOP PLATES SEE CONT. 2x MIN SILL PLATE L.V.P. AT 16"OC, MAX SEE , DOUBLE SILL PLATE WITH NAILING PER SCHEDULE WHERE LW CONCRETE TOPPING IS PLACED NOTE: CUTTING, NOTCHING, OR BORING OF STUDS OR PLATES SHALL COMPLY WITH DETAILS ON . CONCRETE CONDITION HEADER, SEE PLAN AND DETAIL 16d AT 12"OC TYPICAL AT ALL MULTIPLE STUDS 2x SOLID BLOCKING OR WALLS OVER 10'-0" HIGH W/ 2-10d TOE NAIL EACH END 48"o.c. MAX SPACING 2-16d END NAILS, MIN (TYP TOP & BOTTOM) U.N.O. STUDS AT 16"OC MAX, TYP AT FURRED AND NON-BEARING INTERIOR PARTITIONS, SEE PLAN & SCHEDULE DETAIL DOUBLE KING STUDS WHERE REQUIRED SEE DETAIL FOR HOLES IN STUDS SEE DETAIL LAP END TO OCCUR OVER STUD (TYPICAL) 16d AT 12"OC MAX, U.N.O. SEE DETAIL 4'-0" MIN LAP FOR SPLCE WALL HEIGHT 'H' BAY OF 2x SOLID BLKG AT DOORS AT HOLES IN SILL PLATES SEE /1 S6.03 /5 S6.02 /8 S6.02 /---- /1 S6.02 /2 S6.04 /1 S6.03 /10 S6.03 /8 S6.02 S6.02 3 TRIM TO ACCOMODATE ROOF SLOPE AND PROVIDE FULL BEARING FOR TOP PLATE JOIST PER PLAN MAX 2" GLB PER PLAN, NOTCHED TO ACCOMODATE ROOF SLOPE AND PROVIDE FULL BEARING CRIPPLE STUDS/POST PER PLAN HEADER PER PLAN SHEARWALL SHEATHING PER PLAN NOTES: 1. SEE FOR ALL INFO NOT SHOWN. 2. IN LIEU OF NOTCHING, IT'S STRUCTURALLY ACCEPTABLE TO USE SHAPED TOP PLATE TO PROVIDE FULL BEARING FOR GLB. /4 S6.22 (2) SIMPSON A34 AT EA ROOF JOIST, ONE ON EA SIDE SIMPSON A34 @ 9" OC 3 NOTES: 1. SEE FOR ALL INFO NOT SHOWN. 2. IN LIEU OF NOTCHING, IT'S STRUCTURALLY ACCEPTABLE TO USE SHAPED TOP PLATE TO PROVIDE FULL BEARING FOR GLB. GLB PER PLAN, NOTCHED TO ACCOMODATE ROOF SLOPE AND PROVIDE FULL BEARING CRIPPLE STUDS/POST PER PLAN HEADER PER PLAN SHEARWALL SHEATHING PER PLAN MAX 2" JOIST PER PLAN /4 S6.22 (2) SIMPSON A34 AT EA ROOF JOIST, ONE ON EA SIDE SIMPSON LTP4 @ 9" OC SIMPSON A34 @ 9" OC BN 3 3 3 3 POST SEE PLAN FOR SIZE TOP OF CONCRETE FILLED METAL DECK PER PLAN SIMPSON A35 OR BCO EACH SIDE 2x CONTINUOUS SILL PLATE 1/2"Ø KB-TZ2 W/ 2" EFF-EMBED 1 1/2" 3" 9" POST PER PLANPL 1/4x3x0'-9" EACH SIDE W/ (2) 3/4"Ø BOLTS CONC FILLED METAL DECK PER PLAN 3/16 TYP 3/16 TYP STL BEAM PER PLAN 1/4" STIFF PL AT EA END PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:30 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL WOOD DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.04 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 3/4" = 1'-0"3 TYPICAL WALL FRAMING DETAILS EXTERIOR AND INTERIOR BEARING SCALE : 1" = 1'-0"1 GLB DETAIL SCALE : 1" = 1'-0"2 INTERIOR WALL STUD SCHEDULE (NON-BEARING) SCALE : 3/4" = 1'-0"4 TYPICAL WALL FRAMING DETAILS - NON-BEARING WALLS 1A GLB EXTERIOR DETAIL 1B GLB OVERHANG DETAIL SCALE : 1" = 1'-0"5 TYP WOOD POST ON SILL PLATE & CONC FILLED DECK SCALE : 1" = 1'-0"6 ISOLATED WOOD POST ON SILL PLATE & CONC FILLED DECK No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 MIN 1"CURB WHERE OCCURS POST PER SCHEDULE SHEARWALL PER PLAN ANCHOR BOLT/THREADED ROD PER SCHED PLATE WASHER PER SCHED NOTE: FOR HOLDOWN DETAIL AT CONC FILLED METAL DECK, SEE DETAIL ./4 S7.02 EMBED 15" DOUBLE STUD OR POST PER PLAN CL OF HOLDOWN HOLDOWN PER PLAN SHEATHING ON INTERIOR FACE FOR SHEAR WALLS WHERE OCCURS EN EN STUD WALL PER PLAN 1/2" MIN 3/8" MIN 2" PER PLAN EN SHEATHING CONT. THROUGH WHERE POST PER PLAN HOLDDOWN OCCURS2" DBL STUD OR POST PER PLAN EN EN HOLDDOWN PER PLAN DBL STUD OR POST PER PLAN 2" 1/2" NOTE: HOLDOWNS PER DETAILS SHALL BE STAGGERED SIM TO KING STUD WHERE OCCURS DBL STUD OR POST PER PLAN HOLDOWN PER PLAN, TYP SHEATHING PER X/X EN TYP 12" MAX /2B S6.05 /1 S6.05 2A S6.05 NOTE: HOLD-DOWN CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE APPROVED PLAT WASHERS; AND HOLD-DOWNS SHALL BE FINGER TIGHT AND WRENCH TURNED JUST PRIOR TO COVERING THE WALL FRAMING. CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE STEEL PLATE WASHERS ON THE POST ONTHE OPPOSITE SIDE OF THE ANCHORAGE DEVICE. PLATE SIZE SHALL BE A MINIMUM OF 0.299 INCH BY 3 INCHES BY 3 INCHES. MARK MODEL # OF SIMPSON SDS 1/4"x2 1/2" TITEN SCREWS TO POST ANCHOR BOLT / THREADED ROD DIAM (IN) F1554 GR55 PLATE WASHER SIZE HD1 HDU2-SDS2.5 6 5/8 3/8" X 1 1/2"X 1 1/2" HD2 HDU4-SDS2.5 10 5/8 3/8" X 1 1/2"X 1 1/2" HD3 HDU2-SDS2.5 6 5/8 3/8" X 1 1/2"X 1 1/2" HD4 HDU4-SDS2.5 10 5/8 3/8" X 1 1/2"X 1 1/2" MARK MODEL # OF 6d SINKER NAILS FLOOR TO FLOOR TIE NOTES HDS1 MSTC 52 44 1. INSTALL STRAP OVER SHEATHING. 2. PROVIDE 1/2 OF REQUIRED NAILS IN EACH MEMBER BEING CONNECTED. HDS2 MSTC 66 64 t x L x W HOLDDOWN SCHEDULE VERTICAL SEISMIC STRAP SCHEDULE POST SIZE 4x6 6x6 6x6 6x10 SILL PL THICKNESS 2x 3x 2x 3x LSTHD8 HOLD DOWN @ 48" OC EA SIDE (2) 2x6 @ HOLD DOWN STRAPS AND@ (1) 2x6 @ 16" O.C. INTERMITTENT 3 " CONT #4 REBAR 42" MAX 2" SOG PER PLAN PER PLAN, UNO 16" MAX EDGE NAILING PER PLAN, UNO 16" MAX HOLDOWN PER PLAN TYPICAL COMPRESSION POST W/ EN PER SCHEDULE SHEATHING ON BOTH SIDES WHERE OCCURS TYPICAL WALL STUD PER PLAN AND SCHEDULE PER PLAN, UNO 16" MAX HOLDOWN PER PLAN PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:31 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 WOOD SHEAR WALL DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.05 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB 1A SINGLE HOLDDOWN 2B WALL END 2A INTERMEDIATE WALL 2D TYP WALL CORNER/END 2C TYP FOR WALL ENDS AT OPENINGS WHERE DOUBLE HOLDOWN IS REQUIRED SCALE : 1" = 1'-0"2 TYPICAL SHEARWALL HOLDOWNS SCALE : 1" = 1'-0"1 TYPICAL HOLDOWN SCHEDULE SCALE : 1" = 1'-0"3 PARTIAL WALL ANCHORAGE SCALE : 1" = 1'-0"4 TYPICAL SHEAR WALL AT INTERSECTIONS No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 CONCRETE CONDITION ROOF CONDITION FIELD NAILING, TYPICAL AT ALL INTERMEDIATE SUPPORTS EDGE NAIL TO TOP PLATE TYPICAL STUDS FULL SIZE PLYWOOD OR OSB SHEET, TYPICAL U.N.O. (PLYWOOD FACE GRAIN PARALLEL TO STUD) EDGE NAIL TO SOLE PLATE SOLE PLATE NAILING SEE SCHEDULE CONT 2x MIN SOLE PLATE, SEE SCHEDULE 3x STUD AT WALL TYPE B, C, D STAGGER EDGE NAILS AT PANEL JOINTS, TYPICAL HEADER, SEE PLAN SCHEDULE 16d @ 12"o.c. TYPICAL AT ALL MULTIPLE STUDS STRAP TIE AT CORNER, PER EDGE NAILING HEADER, SEE PLAN AND SCHEDULE FIELD NAILING, TYPICAL AT ALL INTERMEDIATE SUPPORTS EDGE NAIL TO POSTS 2x SOLID BLOCKING FOR WALLS OVER 8'-0" HIGH w/ 2-10d TOE NAILS EACH END 48"o.c. MAX SPACING 4x MIN POST EDGE NAIL TO POST 2x CRIPPLE STUD 16d @12"o.c. TYPICAL EDGE NAIL TO SILL PLATE EDGE NAIL TO SILL PLATE2-16d END NAILS, MIN (TYP TOP & BOTTOM) U.N.O. FOR ANCHOR BOLT SIZE AND SPACING SEE SCHEDULE CONT 3x MIN SILL PLATE, SEE SCHEDULE HOLDOWN, SEE PLAN & SCHEDULE, TYPICAL 2x STUD EDGE NAIL TO POST 4x MIN POST EDGE NAIL TO TOP PLATE CONT 2-2x TOP PLATES SOLID BLOCKING CONT RIM BOARD CONT (2) 2x TOP PLATES NOTES: 1. ALL PLYWOOD SHALL BE 4 PLY MINIMUM AND ALL PANEL EDGES SHALL BE BLOCKED. 2. ALL NAILS SHALL BE COMMON NAILS. 3. PROVIDE EDGE NAILING AT ALL EDGES OF SHEATHING, END STUDS, SOLE PLATES AND TOP PLATES. 4. WHERE SHEAR CAPACITY IS LESS THAN 600 PLF A 2x SILL PLATE MAYBE USED IN LIEU OF 3x IF THE ANCHOR BOLT SPACING IS REDUCED TO 1/2 OF THE REQUIRED SPACING CALLED OUT IN THIS SCHEDULE. 5. WHERE 10d NAILS ARE 3" ON CENTER OR LESS, OR SHEAR CAPACITY IS GREATER THAN 300 PLF, NAILS SHALL BE STAGGERED AND FRAMING MEMBER AT PANEL EDGES (EXCEPT INTERMEDIATE SUPPORTS) SHALL BE 3x MIN THICKNESS UNLESS NOTED OTHERWISE IN NOTE 4. 6. NAILS SHALL BE 1/2" MINIMUM FROM PLYWOOD PANEL EDGE. NAILS SHALL BE 3/8" MINIMUM FROM CONNECTING MEMBER EDGE WHERE SHEAR EXCEEDS 300 PLF. 7. SOLE NAILS OR LAGS APPLY TO SILL PLATE ATTACHMENTS WHERE THE SHEAR WALL IS LOCATED ABOVE A CRIPPLE WALL, ANOTHER SHEARWALL OR OTHER WOOD FRAMING. WHERE SILL PLATE IS ON TOP OF CONCRETE OR MASONRY SEE ANCHOR BOLTING COLUMN FOR REQUIRED ATTACHMENT. 8. BASE FRAMING SHALL BE DOUBLE 2x TOP PLATE OR 3x BLOCKING MINIMUM. SIMPSON SDS SCREWS TO HAVE A MINIMUM OF 2" PENETRATION INTO RIM JOIST. LAG BOLT PENETRATION (NOT INCLUDING TAPERED TIP) INTO BASE FRAMING SHALL BE 3" MINIMUM. 9. WHERE LTP4 ARE INSTALLED OVER PLYWOOD 8dx2 1/2" NAILS SHALL BE USED IN LIEU OF HANGER NAILS. 10. SEE TYPICAL BEARING WALL FRAMING DETAIL FOR STUD WALL CONSTRUCTION. 11. PROVIDE SIMPSON BPS OR LBPS PL WASHER AT EACH ANCHOR BOLT. 12. ANCHOR BOLTS (A.B.) SHALL HAVE 5" MIN EMBEDMENT INTO CONCRETE. LENGTHEN A.B. AS REQUIRED FOR EMBEDMENT AND SILL PLATE THICKNESS. THERE SHALL BE A MIN OF TWO A.B. PER SILL PIECE WITH ONE A.B. LOCATED NOT MORE THAN 12" OR LESS THAN 6" FROM EACH END OF THE SILL PIECE. FOR ANCHOR BOLTS AT CONCRETE CURB SEE DETAIL . FOR ANCHOR BOLT TO CONC FILLED METAL DECK, SEE 4/S7.02. 13. ORIENTED STRAND BOARDS (OSB) MAY BE SUBSTITUTED FOR PLYWOOD NOTED ABOVE PROVIDED IT IS RATED BY APA'S PERFORMANCE STANDARD RATING AND IS RATED STRUCTURAL I AND FOR EXTERIOR USE. 14. SPACING SHOWN ARE BASED ON FULL LENGTH OF SHEAR WAL SHOWN ON THE PLANS. WHERE IT IS NOT POSSIBLE TO PLACE THE ANCHOR BOLTS DUE TO LOCATION OF THE TIE-DOWNS ANCHOR, BOLTS SPACING SHALL BE REDUCED SO TOTAL NUMBER OF ANCHORS REMAIN THE SAME. SEE DETAIL WHERE ANCHOR BOLT INTERFERE WITH COMP POSTS. 15. USE MIN 4x END POSTS AT ALL SHEARWALLS UNLESS OTHERWISE NOTED. 16. WHERE PANELS ARE APPLIED TO BOTH FACES OF A WALL OFFSET PANEL JOINTS TO FALL ON DIFFERENT FRAMING MEMBERS. 17. INDIVIDUAL PIECES OF PLYWOOD SHALL NOT BE LESS THAN 16" IN LEAST DIMENSION NOR LESS THAN 5 SQFT. IN TOTAL AREA. 18. ALL FASTENERS IN CONTACT WITH PRESSURE TREATED SILL PLATES OR FRT TREATED WOOD PRODUCT SHALL BE GALVANIZED. 19. REDUCED SHEAR WALL CAPACITY SHOWN IN SCHEDULE IS FOR FRT TREATED WOOD WITH HOOVER PYRO-GUARD PER LARR25150. 20. SAWN LUMBER RIMS OR BLOCKING SHALL BE USED WHERE A SAWN LUMBER FLOOR OR ROOF SYSTEM IS BEING USED AND LVL RIMS OR BLOCKING SHALL BE USED WHERE AN ENGINEERED WOOD FLOOR OR ROOF SYSTEM IS BEING USED FOR RIM BEAM OPTIONS AT EXTERIOR FRT WALLS. 21. AT CONTRACTOR'S OPTION, CONNECTORS FOR THE LOWER SHEAR WALL MAY BE OMITTED BY EXTENDING THE WALL SHEATHING ABOVE THE DOUBLE TOP PLATE AND ATTACHED TO RIM OR BLOCKING WITH EDGE NAILING PER SCHEDULE. 22. TWO LINES OF BOUNDARY NAILING ARE REQUIRED AT ALL INTERIOR WALLS. 23. BUILDING EXTERIOR WALL PLYWOOD SHEATHING SHALL BE FIRE RETARDANT TREATED WIT HOOVER PYROGARD (LARR #25150) /2 S6.06 CS16 U.N.O. OVER 2x BLK'G TYP. AT OPENING IN SHEARWALL APPLY STRAP OVER SHEATHING /8 S5.01 FLOOR FLOOR CS 16-R STRAP TOP AND BOTTOM OF OPENING EN AROUND OPENINGS NOTES: 1. BLOCKING AND STRAPPING NOT REQUIRED WHEN OPENING DIMENSION ARE LESS THAN 6" AND THEY ARE SPACED AT (2) OR MORE STUD BAYS. 2. MULTIPLE ADJACENT OPENINGS SPACED LESS THAN (2) BAYS SHALL BE CONSIDERED AS SIGNLE JOINED OPENING. 16" MAX 16" MAX 4x BLKG AT STRAP 16" OC ALL STUDS FLOOR FLOOR SEISMIC STRAP PER SHEAR WALL SCHEDULE 4x BLKG AT STRAP EN AROUND OPENINGS NOTE: WHERE PLYWOOD SHEATHING IS SPECIFIED ON BOTH SIDES OF WALL PER SHEAR WALL SCHEDULE, PROVIDE STRAP ON BOTH SIDES OF WALL. TYP Ls 15/32" STRUCTURAL I SHEAR WALL SHEATHING / NAILING SCHEDULE SILL ATTACHMENT WOOD LAG SCREWS B 2x SHEATHING 15/32" STRUCTURAL I WALL SYMBOL A FRAMING SIZE 2x 10d @12" OC10d @4" OC SUPPORTS (FN) INTERMEDIATE 10d @12" OC10d @6" OC EDGE (EN) NAILING SHEAR CAPACITY PER AWC SDW5 ASD / LRFD 5/8"Ø @ 32" OC 5/8"Ø @ 32" OC ANCHOR BOLTING 7,8 11,12 2,5.6 1,14,16 3 10,14 4,5 LTP4 OR A35 16" OC 16" OC 9 SIMPSON SDS25 @12" OC SIMPSON SDS25 @8" OC REDUCED SHEAR CAPACITY FOR FRT PLYWOOD WALLS ASD / LRFD 18, MIN. RIM OR BLK'G AT FLOOR OR ROOF 19 459 PLF / 734 PLF 288 PLF / 490 PLF 2x OR 1 3/4 LVL 2x OR 1 3/4 LVL510 PLF / 816 PLF 320 PLF / 544 PLF 24 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:32 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 WOOD SHEAR WALL DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.06 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1" = 1'-0"1 TYPICAL PLYWOOD SHEARWALL AND SCHEDULE SCALE : 3/8" = 1'-0"3 FRAMING AROUND SMALL OPENINGS IN SHEAR WALLS SCALE : 3/8" = 1'-0"2 FRAMING AROUND LARGE OPENINGS IN SHEAR WALLS No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 9' - 0" MAX LANDING SIMPSON LSTA 18 W/ (6) 10d EA END SIMPSON A35 @ 12" OC SIMPSON LSSU310 2x8 @ 16" OC (6'-0" MAX SPAN) 2x10 @ 16" OC (9'-0" MAX SPAN) 4x12 D.F. #1 BEAM FOR SPAN = 4'-0" MAX 6x12 D.F. #1 BEAM FOR SPAN = 9'-0" MAX 2x BLOCKING W/ 10d NAILS @ 4" OC 2x LEDGER W/(2) SDS25312 @ 16" O.C.TO EA WALL STUD ON ALL SIDES OF LANDING WALL STUDS PER PLAN 2/3 "A" MIN PER 4x BLOCKING S6.10 5 / 2 S6 . 1 0 STAIR OPENING EDGE NAIL BEAM, SEE PLAN10d @ 4" OC TO BLOCKING FINISH PER ARCH OVER PLYWOOD, SEE PLAN 2 BAYS OF 2x BLKG AT EA STRINGER JOIST PER PLAN H2.5A, TOP & BOT LSTA STRAP AT EA STRINGER SEE SCHED FOR STAIR STRINGER FRAMING BM PER WOOD STAIR STRINGER SCHEDULE SPAN 9'-0" MAX STRINGER SIZE 4"x14" "A" 8" MIN REMARKS - SPACING 24" OC MAX 11'-0" MAX 10" MIN -24" OC MAX NOTE: NO CONCRETE OR GYPCRETE TOPPING ON STAIRS OR LANDING. 4"x16" / -1 STAIR STRINGER PER SCHEDULE SEE 3/4" PLYWOOD 48:24 W/ (2) 10d AT EA STRINGER SIMPSON A35 AT EACH STRINGER 2x P.T. W/ (2) 0.144"Ø POWER DRIVEN SHOT PINS @ 12" OC CONCRETE SLAB PER PLAN ON PER SCHEDULE "A" / -2 / - 2 EQ EQ W12x19 CTR BTW STRINGERS CONC FILLED DECK PER PLAN SHEAR TAB, BOLT AND WELD, SEE STRUCTURAL DETAIL /1 S7.01 Wx BEAM PER PLAN PL 1/2"-THK BEARING 2" 1" 1/4 1/4"-THK PL ON EA SIDE STAIR STRINGER PER PLAN 4" 4" LANDING 2x LEDGER W/ (2) SDS25312 @ 16" OC TO EA WALL STUD ON ALL SIDES OF LANDING WALL STUDS PER PLAN SIMPSON H8 AT EA STUD (4) MIN 2x BLOCKING OR LANDING JOIST PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:32 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 WOODSTAIR DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.10 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 SCALE : 1" = 1'-0"1 WOOD STAIR STRINGER (ABOVE) TO LANDING SCALE : 1" = 1'-0"2 WOOD STAIR STRINGER (BELOW) TO LANDING SCALE : 1" = 1'-0"3 WOOD STAIR STRINGER (BELOW) TO CONC SLAB SCALE : 1 1/2" = 1'-0"4 WOOD STAIR STRINGER (ABOVE) TO STEEL BEAM SCALE : 1 1/2" = 1'-0"5 LEDGER TIES 3 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 ALLOWABLE HOLES -TJI JOISTS ROUND HOLE SIZE SQ. OR RECTANGULAR HOLE SIZE 1'-0" 1'-0" 1'-0" 1'-0" 2'-0" 1'-0" 2'-6" 2'-6" 3'-0" 4'-0" 1'-0" 1'-0" 3'-0" 3'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 16"1'-0"360 20" 18"360 360 560 560 560 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 4" 6" 91/2" 14" 117/8" 1'-6"560 360 210 230 560 210 230 110 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 230 360 110 210 230 360 110 210 1'-0" 1'-0" 1'-0" 2'-0" 1'-6" 2'-0" 2'-6" 3'-0" 13'-6"6'-6"1'-0" 3'-0" 10'-0" 2'-6" 6'-0" 6'-0" 1'-6" 3'-0" 3'-0" 2'-0" 1'-0" 1'-0" 1'-0" 8" 10" 9'-0" 15'-0" 6'-0" 5'-6" 10'-0" 11'-0" 12'-0" 16'-6" 12" 7'-0" 15" 11'-0" 15'-6" 16'-0" 17" 15'-0" 12'-0"4'-6" 8'-0" 2'-6" 2'-0" 3'-0" 5'-6" 5'-6" 1'-6" 1'-0" 2'-0" 1'-6" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 8'-6" 12'-6" 3'-0" 4'-0" 9'-6" 5'-6" 6'-6" 13'-6" 5'-0" 5'-6" 4'-6" 9'-0" 10'-0" 8'-0" 7'-6" 7'-6" 8'-0" 9'-0" 5'-0" 4'-0" 4'-6" 7'-0" 1'-6" 2'-0" 2'-6" 4'-0" 3'-0" 3'-6" 4'-0" 5'-6" 9'-6" 11'-0" 8'-0" 9'-0" 9'-6" 10'-6" 17'-0"2'-0" 7'-6" 13'-0" 14'-6"1'-0" 1'-0" 12" 14'-6" 16'-6" 18'-0" 17'-6' 16'-6" 3'-6" 11'-6" 9'-0" 8'-6" 7'-0" 4'-0"1'-0" 1'-0" 1'-0" 1'-0" 1'-6" 3'-0" 6'-0" 4" 1'-0" 6" 1'-0" 14'-6" 12'-6" 14'-0" 16'-6" 10" 9'-0" 8" 17" 18'-0" 20'-6" 21'-0" 19'-6" 20'-0" 19'-6" 19'-0" 15" 16'-0" 9'-0" 10'-0" 10'-0" 11'-0" 12'-0" 9'-0" 10'-6" 12'-0" 13'-6" 9'-6" 10'-6" 10'-0" 6'-0" 10'-6"3'-0" 4'-6" 1'-0" 2'-6" 4'-0" 5'-0" 1'-0" 1'-0" 2'-0" 1'-0" 2'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 3'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 9'-0" 10'-0" 4'-6" 5'-0" 5'-0" 6'-0" 6'-0" 3'-6" 4'-0" 4'-6" 2'-6" 3'-0" 3'-6" 5'-0" 5'-6" 1'-0" 2'-0" 1'-0" 1'-0" 2'-6" 3'-6" 1'-6" 2'-0" 2'-6" 3'-0" 1'-6" 2'-0" 3'-0" 4'-6" 2'-6" 3'-0" 6'-6" 7'-6" 8'-0" 9'-6" 6'-6" 7'-0" 7'-6" 8'-0" 15'-6" 16'-0" 14'-0" 15'-0" 12'-6" 13'-0" 12'-0" 13'-0" 12'-6" minimum 2 x L SQ. OR RECTANGULAR HOLE SIZEROUND HOLE SIZE 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-6" 1'-6" 2'-0" 2'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 560 1'-0" DEPTH 18" 20" 16" 1'-0"360 TJI® 560 2" 3" 1'-0" 360 560 560 360 230 210 1'-0" 1'-0" 4" 6" 1'-0" 1'-0" 1'-0" 1'-0" 91/2" DEPTH 117/8" 14" 210 1'-0" 110 230 360 210 360 560 230 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 210 360 110 230 110 TJI® 1'-0" 1'-0" 1'-6" 1'-0" 1'-0" 2" 3" 9'-0"6'-0"2'-6"1'-0" 2'-0"1'-0" 1'-0" 7'-0" 1'-0" 4"61/2" 1'-0" 87/8"11" 1'-0" 7'-0" 2'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 8"10" 1'-0" 1'-0" 1'-0" 1'-0" 5'-0" 5'-0" 12" 10'-0" 11'-0" 15" 2'-0" 3'-0" 3'-0" 1'-6" 4'-0" 6'-6" 6'-0" 3'-6" 10'-6" 13" 11'-0" 17" 6'-6" 10'-0" 9'-0" 6'-0" 5'-6"2'-6"1'-0" 3'-0" 4'-6" 5'-0" 1'-0" 1'-6" 2'-6" 1'-0"1'-0" 1'-0" 1'-0" 1'-0" 1'-6" 1'-6" 1'-0" 5'-0"2'-6" 3'-6" 5'-6" 3'-0" 6'-6" 8'-0" 6'-0" 7'-0" 8'-0" 6'-0" 5'-0" 5'-0" 5'-6" 6'-0" 2'-6" 2'-0" 1'-0" 3'-0" 2'-6" 2'-0" 4"61/2" 5'-0" 87/8"11" 13" 2 x D minimum (applies to all holes except knockouts) No field cut holes in hatched zones L 6" 1 See Table A 6" See Table A D1 1 L 2 9'-0"1'-6" 6'-6"10'-0"1'-0" 1'-0" 12" 11'-0" 12'-6' 11'-6" 12'-0" 6'-6" 7'-0" 10'-0" 9'-0" 87/8" 8'-0"2'-6"1'-0"1'-0" 4'-0" 2" 3" 1'-0" 1'-0" 61/2"4" 9'-6" 5'-0" 6'-6" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 4" 1'-0" 1'-6" 6" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 10" 10'-0" 11'-0" 8" 4'-0" 3'-0" 2'-6" 5'-0" 14'-0" 15'-6" 15'-6" 13"11" 14'-6" 17" 10'-6" 11'-0" 12'-0" 11'-6" 15" 13'-6" 14'-6" 8'-0" 9'-0" 10'-0" 11'-0" 6'-0" 6'-6" 7'-0" 8'-0" 7'-6" 6'-6" 6'-0" 8'-0" 7'-0" 87/8" 2'-0" 5'-0"1'-0" 1'-0" 2'-0" 3'-6" 2'-6" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 1'-0" 2'-0" 1'-0" 3'-6" 4'-0" 4'-0" 5'-6" 7'-0" 5'-6" 6'-6" 2'-6" 2'-6" 3'-0" 3'-6" 1'-6" 1'-0" 2'-0" 1'-6" 1'-0" 1'-0" 2'-6" 1'-0" 2'-0" 2" 1'-0" 3" 1'-6" 5'-0" 5'-0" 5'-6" 4'-6" 4'-6" 61/2"4" 8'-0" 8'-6" 9'-0" 9'-6" 13"11" DO NOT cut holes in cantilever reinforcement. DO NOT cut or notch flange. Do not cut holes larger than 11/2" in cantilever 11/2" hole may be cut anywhere in web out- side hatched zone D22 6"6" 6" See Table B See Table B Rectangular holes based on measurement of longest side. For simple span (5' minimum) uniformly loaded joists meeting the requirements of current Trus Joist product guides, one maximum size round hole may be located at the center of the joist span provided no other holes occur in the joist. Holes may be located vertically anywhere within the web. Leave18" of web (minimum) at top and bottom of hole. Knockouts are located in web at approximately 12" on-center; they do not affect hole placement. Distances are based on the maximum uniform loads shown in current Trus Joist product guides. For other load conditions or hole configurations contact your Trus Joist representative. Table B - Intermediate or Cantilever Support Minimum distance from edge of hole to inside face of nearest intermediate or cantilever support Table A - End Support Minimum distance from edge of hole to inside face of nearest end support TJI 230 2-TJI 210 TJI 210 TOP FLANGETYPE ITS2.06/d MIT4.28/d ITS2.37/d 2-TJI 230 MIT35/d-2 TJI 360 2-TJI 360 ITS2.37/d MIT35/d-2 TJI 560 ITS3.56/d HANGERS ARE TYPICAL U.N.O. IN DRAWINGS. USE SKEWED OR SLOPED HANGERS AS REQUIRED. FASTENERS SPECIFIED FOR MAXIMUM LOADS. INSTALL PER MANUFACTURER'S INSTRUCTIONS. FILL ALL HOLES WITH 4. 3. NOTES: 1. 'd' IS MEMBER DEPTH2. SIMPSON DESIGNATIONS FACE MOUNTED IUS2.06/d MIU4.28/d IUS2.37/d MIU4.75/d-2 IUS2.37/d MIU4.75/d-2 IUS3.56/d TJI JOIST 2 ROWS 16d @ 3"OC EACH SIDE 2 ROWS 8d @ 6" OC CLINCH AS REQUIRED CONTINUOUS FILLER BLOCK FOR LENGTH, SEE PLAN TIGHT FIT AT BOT FLANGE 2" TYP 2" 2" 3" 2" 1/8" MIN 1/2" MAX 3" TIGHT FIT AT BOT FLANGE WEB STIFFENER WEB STIFFENER SIZE BY MANUFACTURER (12" MINIMUM) TJI JOIST (2) 8d NAILS EACH SIDE CLINCH AS REQUIRED 2" 1/8" MIN 1/2" MAX 2" AA AA I14 "I" JOIST "I" JOIST BLOCKING PANEL (SAME SIZE & MATERIAL AS JOISTS) SNUG FIT AT BOTTOM 2x4 BLOCK, TYP "I JOIST WEB BLOCKING PANEL (3) 8d EACH BLOCK TYPICAL 1/8" MIN 1/2" MAX SECTION A-A NOTE: FOR SOLID BLOCKING AT TIEDOWNS, SEE TIEDOWN ELEVATIONS. 1 3/4" LSL RIM BOARD SQUASH BLOCKS 10d TOP & BOTTOM TYPICAL CONTINUOUS (2) 2x TOP PLATES POST OR JAMB SEE PLAN 1 3/4" LSL RIM BOARD POST OR JAMB SQUASH BLOCK (1) 2x4 MIN AT 2x4 WALL (2) 2x4 MIN AT 2x6 WALL 1/8" WIDTH TO MATCH POST OR JAMB NOTE: FOR SOLID BLOCKING AT TIEDOWNS, SEE TIEDOWN ELEVATIONS. TJI JOIST POST OR JAMB SQUASH BLOCK EACH SIDE WEB STIFFENER EACH SIDE TJI JOIST SEE PLAN 10d TO TOP & BOTTOM FLANGE, TYP 2x4 MINIMUM SQUASH BLOCK EACH SIDE POST OR JAMB SEE PLAN WEB STIFFENER EACH SIDE CONTINUOUS (2) 2x TOP PLATES STUDS SEE PLAN TO MATCH WIDTH POST WIDTH TO MATCH POST OR JAMB AT TJI, PROVIDE FILLER BLOCK ONE SIDE, SEE 3/- AT SHEAR AND FIRE WALLS, PLYWOOD OR GYP BOARD SHALL BE CONTINUOUS BEHIND LEDGER WALL STUDS 2x BLKG AS REQ'D 14'-0" 12'-6" 9'-6" 8'-0" SPAN MAX 2x6 AT 16" OC 2x6 AT 24" OC 2x4 AT 16" OC 2x4 AT 24" OC CEILING JOISTS 2x4 LEDGER WITH 2-16d TO EACH STUD 1. FOR SPANS GREATER THAN 14'-0", USE HUNG CEILING DETAILS. 2. DO NOT SUPPORT MECHANICAL EQUIPMENT ON CEILING JOISTS, PROVIDE HANGERS TO STRUCTURE ABOVE. NOTE: 2x BLKG JOIST HANGER 1x4 HANGER WITH (2) 8d EACH END MAXIMUM SPAN SEE TABLE FOR FLUSH BEAM BEAM GYPCRETE OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN FLUSH BEAM, SEE PLAN 10d AT 6" OC IUT HANGER, TYPICAL SEE SCHEDULE AT STUD WALL ABOVE SEE PLAN GYPCRETE OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN 10d AT 6" OC AT STUD WALL ABOVE SEE PLAN BEAM, SEE PLAN IUT HANGER, TYPICAL SEE SCHEDULE FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN STUD WALL, SEE PLAN 16d AT 8" OC STUD WALL, SEE PLAN EDGE NAIL SQUASH BLOCK UNDER POST OR JAMB TJI BLOCKING (4) 10d EACH BLOCKING TYPICAL (1) 10d EACH SIDE JOIST FLANGE TO TOP PLATE, TYPICAL 3 TJI BLKG AT 48" OC 16d AT 8" OC CONTIN TJI ABOVE WALL w/ 10d TOE NAIL AT 6" OC TO TOP PLATE STUD WALL SEE PLAN 10d AT 4" OC TO TJI BLKGSTUDS, SEE PLAN FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN 3 16d AT 8" OC TJI BLKG w/ 10d TOE NAIL AT 6" OC TO TOP PLATE STUD WALL SEE PLAN STUDS, SEE PLAN FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN 3 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:34 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TJI DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.21 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 3/4" = 1'-0"1 TJI JOISTS - ALLOWABLE HOLES SCHEDULE SCALE : 1" = 1'-0"2 HANGER SCHEDULE - "I" JOIST SCALE : 1 1/2" = 1'-0"3 FILLER BLOCK NAILING SCALE : 1 1/2" = 1'-0"4 WEB STIFFENER NAILING SCALE : 1 1/2" = 1'-0"5 "I" JOIST BLOCKING SCALE : 1" = 1'-0"6 SQUASH BLOCK AT RIM BOARD SCALE : 1" = 1'-0"7 SQUASH BLOCKS AT TJI JOIST SCALE : 1" = 1'-0"8 SUSPENDED WOOD CEILING SCALE : 1" = 1'-0"9 TJI TO BEAM CONNECTION SCALE : 1" = 1'-0"10 BEARING WALL - JOIST PERPENDICULAR SCALE : 1" = 1'-0"11 BEARING WALL - JOISTS PARALLEL SCALE : 1" = 1'-0"12 BEARING WALL - JOISTS PARALLEL/PERPENDICULAR No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 TJI BLKG AT 24" OC SEE TJI FRAMING SEE PLAN STUD WALL SEE PLAN (2) 2x4 TOP PLATES (1) 10d EA SIDE STUDS, SEE PLAN TJI BLKG AT 24" OC SEE (2) 16d AT EACH BLKG PANEL FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN WALL ABOVE WHERE IT OCCURS SEE PLAN CONTINUOUS 2x SOLE PLATE W/ (2) 16d AT EACH BLKG PANEL /5 S6.21/5 S6.21 3 3 3 STUDS, SEE PLAN CONTINUOUS 2x SOLE PLATE W/ 16d AT 8" OC STAGGERED 16d AT 8" OC CONTINUOUS TJI ABOVE WALL W/ 10d TOE NAIL AT 6" OC TO TOP PLATE DBL TJI'S BELOW WALL SEE PLAN 10d AT 4" OC TO TJI BLKG PANEL TJI BLKG AT 48" OC SEE STUD WALL SEE PLAN FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN WALL ABOVE WHERE IT OCCURS SEE PLAN /5 S6.21 3 3 WINDOW, S.A.D. OPENING, S.A.D. STUD WALL, SEE PLAN SILL, SEE SCHEDULE HDR, SEE SCHEDULE & PLAN CRIPPLE STUDS FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS, SEE PLAN EDGE NAIL EDGE NAIL PLYWOOD SHEATHING SEE PLAN & SCHED NOTE: FOR INFO NOT SHOWN SEE DETAIL 4/-. S.A.D. PLYWOOD SHEATHING SEE PLAN & SCHED 3 1 3/4" LSL RIM BOARD TJI BLOCKING PANEL (1) 10d EACH SIDE TO TOP PLATE, TYPICAL PLYWOOD SHEATHING PLYWOOD SHEATHING PLYWOOD JT ON RIM BOARD PLYWOOD SHEATHING TJI JOIST, SEE PLAN EDGE NAIL 3/4" MIN PLYWOOD JOINT, S.A.D. STUDS, SEE PLAN SQUASH BLOCK UNDER POST OR DBL JAMB STUDS, SOLID BLOCK AT TIEDOWNS PLYWOOD SHEATHING & TJI JOISTS SEE PLAN PLYWOOD SHEATHING SEE PLAN & SCHEDULE STUDS, SEE PLAN CONTINUOUS (2) 2x TOP PLATES 10d AT 4" OC TO TJI BLKG PANEL EDGE NAIL TJI BLKG AT 48" OC A35'S PER SHEARWALL SEE SCHEDULE CONT 1 3/4" LSL RIM BOARD PARAPET DETAIL, SEE , TYP/5 S6.22 CONT FRT SOLE PLATE FLUSHED HEADER SEE SCHEDULE & PLAN EDGE NAIL NOTE: FOR INFO NOT SHOWN SEE DETAIL 7/-. PARAPET DETAIL, SEE , TYP/5 S6.22 STUDS, SEE PLAN FRAMING ANCHOR, SEE SHEAR WALL SCHEDULE EDGE NAIL 3 1/2" LSL BLOCKING, TYPICAL LSL BLKG PLYWOOD SHEATHING PLYWOOD SHEATHING SEE PLAN & SCHEDULE FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN (1) 10d EACH SIDE TO TOP PLATE, TYPICAL CONTINUOUS (2) 2x TOP PLATES (W/ (1) ADDL SHAPED TOP PLATE, MATCHING ROOF SLOPE PER ARCH) PLYWOOD SHEATHING 3 B.N. PLYWOOD SHEATHING PLYWOOD SHEATHING PLYWOOD SHEATHING SEE PLAN & SCHEDULE E.N. 1 3/4" LSL RIM BOARD TJI BLOCKING PANEL (1) 10d EACH SIDE TO TOP PLATE, TYPICAL TJI JOISTS SEE PLAN FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN 10d AT 4" OC TO TJI BLOCKING PANEL TJI BLKG AT 48"o.c. CONT SHAPED 1 3/4" PSL STUDS, SEE PLAN CONTINUOUS (2) 2x TOP PLATES E.N.A35 PER SHEAR WALL SCHEDULE 3 PLYWOOD SHEATHING CONTINUOUS 2x SOLE PLATE W/ 16d AT 8" OC (1) 10d EACH SIDE TO TOP PLATE, TYPICAL STUD WALL, SEE PLAN FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS SEE PLAN CONTINUOUS (2) 2x TOP PLATES (1) 10d EACH SIDE TO TOP PLATE, TYPICAL CONTINUOUS JOIST DO NOT SPLICE WALL ABOVE WHERE IT OCCURS SEE PLAN TJI BLKG WHERE WALL ABOVE OCCURS STUDS, SEE PLAN CONTINUOUS 2x SOLE PLATE W/ 16d AT 8" OC TJI BLKG SEE TJI BLKG AT WALL ABOVE /5 S6.21 3 3 EDGE NAIL 3/4" MIN PLYWOOD JOINT, S.A.D. CONTINUOUS 2x SOLE PLATE W/ 16d AT 8" OC, TYP U.N.O. AT SHEARWALLS SEE SCHED STUDS, SEE PLAN PLYWOOD SHEATHING RIM BOARD TJI JOISTS, SEE PLAN PLYWOOD SHEATHING PLYWOOD JT ON RIM BOARD PLYWOOD SHEATHING SQUASH BLOCK UNDER POST OR DBL JAMB STUDS, SOLID BLOCK AT TIEDOWNS PLYWOOD SHEATHING & TJI JOISTS SEE PLAN PLYWOOD SHEATHING SEE PLAN & SCHEDULE STUDS, SEE PLAN CONTINUOUS (2) 2x TOP PLATES (1) 10d EACH SIDE TO TOP PLATE, TYPICAL PLYWOOD SHEATHING SEE PLAN & SCHEDULE EDGE NAIL EDGE NAIL WEB STIFFENER, SEE A35'S PER SHEARWALL SCHEDULE CONT 1 3/4" LSL RIM BOARD PARAPET DETAIL, SEE , TYP/5 S6.22 CONT FRT SOLE PLATE2x6 FRT STUD, TYP FLUSHED HEADER SEE SCHEDULE & PLAN PLYWOOD SHEATHING & TJI JOISTS, SEE PLAN NOTE: FOR INFO NOT SHOWN SEE DETAIL 4/-. EDGE NAIL PLYWOOD SHEATHING SEE PLAN & SCHED PER ARCH, 1' - 3" MAX SHEATHING TYPE (A) PER SHEARWALL SCHED, TYP EN 1/2" LAG SCREW @ 8" OC, STAGGERED PLYWOOD SHEATHING SEE PLAN WINDOW, S.A.D. OPENING, S.A.D. STUD WALL, SEE PLAN HDR, SEE SCHEDULE CRIPPLE STUDS SILL, SEE SCHEDULE FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS, SEE PLAN NOTE: FOR INFO NOT SHOWN SEE DETAIL 7/-. S.A.D. 3 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:35 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TJI-SHEAR WALL TRANSFER DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.22 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1" = 1'-0"2 NON-BEARING WALL - JOIST PARALLEL SCALE : 1" = 1'-0"3 NON-BEARING WALL - JOISTS PARALLEL SCALE : 1" = 1'-0"6 DROP HEADER - JOIST PERPENDICULAR SCALE : 1" = 1'-0"7 EXTERIOR SHEAR WALL - JOIST PARALLEL SCALE : 1" = 1'-0"8 TYPICAL EXTERIOR WALL - JOIST PARALLEL SCALE : 1" = 1'-0"10 INTERIOR SHEAR WALL - JOIST PERPENDICULAR SCALE : 1" = 1'-0"11 INTERIOR SHEAR WALL - JOIST PARALLEL SCALE : 1" = 1'-0"1 NON-BEARING WALL - JOIST PERPENDICULAR SCALE : 1" = 1'-0"4 EXTERIOR SHEAR WALL - JOIST PERPENDICULAR SCALE : 1" = 1'-0"5 TYPICAL EXTERIOR WALL - JOIST PERPENDICULAR SCALE : 1" = 1'-0"9 DROP HEADER - JOIST PARALLEL No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 ELEVATOR GUIDRAILS & CONN TO BUILDING FRAME BY CONTRACTOR WALL PER PLAN REINF NOT SHOWN FOR CLARITY 1/2" EMBEDDED PLATE W/ (6) 1/2"Ø x 4" WELDED STUDS PL x 1'-2" SQ CONTRACTOR TO COORDINATE LOCATION AND SIZE OF PL W/ ELEV SUB-CONTRACTOR 1A S6.30 CONCRETE PIT WALL PER PLAN 1/2" LAG SCREW @ 8" OC STAGGERED TJI BLKG W/ 10d TOE NAIL AT 6" OC TO TOP PLATE SHAFT WALL PER ARCH 2x6 FRT STUD @ 16" OC, TYP FINISH PER ARCH OVER PLYWOOD SHEATHING & TJI JOISTS. SEE PLAN 2'-0" MAX2x BLOCK @ 48" OC ROOF JOIST PER PLAN ROOF PER PLAN SHEATHING TYPE (A) PER SHEARWALL SCHED, TYP ON ALL SIDES EN 2x BLKG BNSLOPE PER ARCH SLAB ON GRADE PER PLAN HSS GUIDERAIL SUPPORT ELEVATOR PIT WALL WHERE OCCURS 2 1 CL 2A S6.30 CL (3) 5/8"Øx5" LONG HEADED STUDS WELDED AT BOTTOM OF PLATE PLATE 1/2"x8"x1'-6" (1/4) SLAB EDGE WHERE OCCURS 1/4 (3) SIDES 1 1/2", TYP 6" EQ EQ SEE TOP CONN FOR PL AND SCREW INFO HSS PER PLAN EN TOP OF TS PER ELEV MANUF 3/4" x 6" x (HSS DEPTH + 1") PL W/ 3/4"Ø x 4" LAG ON EA SIDE OF HSS ROOF FRAMING BN A35 @ 24" OC CONT BEAM PER PLAN CONT DBL TOP PL 1/4 1/4 TYP 4B S6.30 1" CLR 1/4 HSS POST BELOW HSS POST ABOVE PER PLAN CONC METAL DECK PER PLAN Wx BEAM PER PLAN L6x6x1/2 EA SIDE OF HSS W/ 13/16"x2" VERT SLOTTED HOLE (WHERE NO POST OCCUR, PROVIDE PL 16"x4"x1/2") 1/2"Ø DEFORMED BAR ANCHORS PER 1/S8.23 GROUT 1" NON-SHRINK 3/4"Ø A307 THRU BOLT AT CL SLOT 3 3/4" TYP 2 1/2" TYP 2 1/2" TYP 2 1/2" EDGE OF CONC SOG PL 1/2" W/ (2) 5/8"Ø A307 THRU BOLTS. AT SIM CONDITIONS USE HEADED STUDS PER 1/4 30" 12" EQ EQ 27" TYP 1 1/2" TYP 1 1/2" PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:35 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 ENLARGED ELEVATOR SECTIONS AND DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S6.30 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 SCALE : 1" = 1'-0"1 GUIDERAIL SUPPORT AT PIT WALL SCALE : 1" = 1'-0"5 ELEVATOR POP UP SCALE : 1" = 1'-0"2 GUIDERAIL SUPPORT AT SOG/PIT 2A PLAN VIEW SCALE : 1" = 1'-0"3 HSS COL AT ELEVATOR RAIL SCALE : 1" = 1'-0"4 ELEVATOR GUIDERAIL SUPPORT AT CONNECTION DETAIL 4A DETAIL 4B SECTION 3 1A SECTION REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 STANDARD BOLTED CONNECTION SCHEDULE BEAM SIZE NO. & SIZE OF BOLTS REQUIRED PLATE THICKNESS WELD SIZE (tw) W8 C8 W10 C10 W12 C12 W14 W16 W18 W21 W24 W27 W30 W33 W36 W40 (2) 7/8" DIA (2) 7/8" DIA (3) 7/8" DIA (3) 7/8" DIA (4) 7/8" DIA (4) 7/8" DIA (5) 7/8" DIA (6) 7/8" DIA (7) 7/8" DIA (8) 7/8" DIA (9) 7/8" DIA (10) 7/8" DIA (11) 7/8" DIA 1/4" 1/4" 1/4" 1/4" 3/8" 3/8" 3/8" 3/8" 3/8" 3/16" 1/4" 1/4" 1/4" 1/4" 1/4" CONNECTION NOTES: 1. ALL BOLTS TO BE ASTM A325-N. 2. BOLTS SHALL BE TIGHTENED TO AISC "SNUG TIGHT" CONDITION UNLESS NOTED OTHERWISE. 3. CONNECTION PLATES TO HAVE AISC STANDARD HORIZONTAL SHORT SLOTTED HOLES UNLESS NOTED OTHERWISE. 4. USE A572 GR 50 STEEL FOR SHEAR TABS. 5. SHOWN ON PLANS INDICATES NUMBER OF BOLTS ENQUIRED IF DIFFERENT FROM ABOVE. FOR NUMBER OF BOLTS EXCEEDING ABOVE SCHEDULE SEE DETAIL 6. K" PER AISC, LARGER OF THE TWO CONNECTING BEAMS FOR DETAILS 7. REFER TO FOR SHEAR TAB WELD @ SKEW CONDITION. 8. * USE AISC STANDARD HORIZ SHORT-SLOTTED HOLES IN CONNECTION PLATE. 9. WHERE CROSS BEAMS OCCUR, USE FULL HEIGHT STIFFENER OF THE THICKNESS REQ'D FOR THE CROSS BEAM CONNECTION IN LIEU OF THE 1/4" STIFFENER. 3/8" 3/8" 3/8" 3/8" 3/16" 3/16" 3/16" 1/4" 1/4" 1/4" 1/4" /1F S7.01. /1F S7.01. X SC /4 S7.01 3 1 1/2" 2" 3/4" TYP 1 1/2" TYP 3" (3" MIN) K+1 1/2" FOR SHEAR PL AND BOLTS SEE SCHED AISC STANDARD HORIZ SHORT-SLOTTED HOLES IN CONNECTION PL tw tw SEE SCHED CL COL TYP 3" (3" MIN) K+1 1/2" FOR SHEAR PL AND BOLTS SEE SCHED AISC STANDARD HORIZ SHORT-SLOTTED HOLES IN CONNECTION PL tw tw SEE SCHED 5/16 5/16 PL TO COL FLGS, TYP PL 3/8" T&B FOR (5) AND FEWER BOLTS PL 5/8" T&B FOR MORE THAN (5) BOLTS CL COL 3/4" 2" 1 1/2" TYP 1 1/2" FOR SHEAR PL AND BOLTS SEE SCHED COPE FLANGE AS REQUIRED AISC STANDARD HORIZ SHORT-SLOTTED HOLES IN CONNECTION PL TYP 3" (3" MIN) K+1 1/2" tw tw 3 SIDES SEE SCHED K+AISC MIN NOTES: 1. PROVIDE FULL HEIGHT STIFFENER PL WHERE INDICATED ON PLANS 2. WHEN ∆ > 0.15D USE DETAIL CL BEAM D ∆ 3/4"2" 1 1/2" 3/4" 2" 1 1/2" CL BEAM TYP 1 1/2" TYP 3" (3" MIN) K+1 1/2" FOR SHEAR PL AND BOLTS SEE SCHED COPE FLANGE AS REQUIRED AISC STANDARD HORIZ SHORT-SLOTTED HOLES IN CONNECTION PL tw tw SEE SCHED CL BEAM PL 1/2" W/ (2) 7/8"Ø A325-N BOLTS COPE FLANGE AS REQUIRED AISC STANDARD HORIZ SHORT-SLOTTED HOLES IN CONNECTION PL 3/16 3/16 2" 2" 3/4"2" 3"1 1/2" CL COL TYP 1 1/2" TYP 3" (3" MIN) K+1 1/2" tw SEE SCHED FOR SHEAR PL AND BOLTS SEE SCHED AISC STANDARD HORIZ SHORT-SLOTTED HOLES IN CONNECTION PL BEAM OVER COL CONN PER COL PER PLAN OR COL SCHED 1/4" FULL HT STIFF PL EA SIDE NOTE: WHERE CROSS BEAMS OCCUR USE FULL HEIGHT STIFFENER OF THE THICKNESS REQUIRED FOR THE CROSS BEAM CONNECTION IN LIEU OF THE 1/4" STIFFENER. 1 1/2" 2" (1'-0" MIN) SEE PLANS 1/4 1/4 3 SIDES 3" 3/4" 1 1/2" 1 1/2" SEE PLAN FOR BEAM SIZE STIFF PL 1/4", TYP UNO EXTEND PLATE AS REQ'D FOR CONNECTION NOTE: USE LARGER PLATE AND WELD AS REQ'D BY BEAM CONNECTION SCHEDULE. (AISC MIN) (AISC MIN)TYP, UNO NOTES: 1. FILLET WELD SIZE S = PLATE THICKNESS. 2. FOR BEVEL WELDS, BEVEL END OF CONNECTION PLATE TO MAINTAIN b AT 45°. 3. DO NOT INCREASE DIM X WITHOUT ENGINEER'S APPROVAL. 4. * USE HORIZ SHORT SLOTTED HOLES IN PLATE AT COLUMN CONNECTION ONLY. 5. SEE SETAIL FOR ADDITIONAL NOTES. W36 W24 W33 W30 W27 W14 W21 W18 W16 NO.& SIZE OF BOLTS REQUIRED BEAM SIZE SKEWED BEAM CONNECTION SCHEDULE PLATE THICKNESS, t 5/16" (3) 7/8"Ø (4) 7/8"Ø (5) 7/8"Ø (6) 7/8"Ø (7) 7/8"Ø (8) 7/8"Ø* (9) 7/8"Ø* S WELD FOR 1,2 80°<b<90° WELD FOR 1,2 60°<b<80° S + 1/16 CONN CAPACITY (SIGN.SHEAR) W12 W10 W8 (9) 7/8"Ø* (5) 7/8"Ø (3) 7/8"Ø (2) 7/8"Ø (2) 7/8"Ø 5/16" 5/16" 5/16" 5/16" 5/16" 5/16" 3/8" 3/8" 7/16" 1/2" 1/2" 11.1K 11.1K 22.1K 35.4K 49.1K 62.7K 76.4K 83.9K 91.2K 91.2K 22.1K 49.1K S S + 1/8 S S + 1/8 45° GIRDER WEB OR COLUMN FLANGE FOR PLATE SEE SCHED BEAM WEB 3" DIM X 1 1/2" b = 0°-60° 3/16 FOR 45°<b<60° SEE SCHED 45° 45° a SEE SCHED FOR 30°≤b≤60° FOR 0°≤b≤30° SPAN/6 MAX CL OPENING CL SPAN NOTES: 1. FLANGE & STIFFENER NOT REQUIRED FOR 3" SQ HOLES MAX. 2. MOMENT FRAME BEAMS, DRAG BEAMS, AND CHORD BEAMS MAY NOT BE PENETRATED WITHOUT STRUCTURAL ENGINEER'S APPROVAL. 1/2" 1/2" MAX D/3 DWGS (3/4 D MAX) VARIES SECH MECH 1/2" D TYP PL 1/2" FLG WIDTH x FLG THICKNESS HORIZ NEAR SIDE ONLY R=1" TYP D/3 MIN D/3 MIN AISC MIN SECTION ELEVATION CL B E A M & OP E N I N G VERT STIFF PL EA SIDE OF OPENING W/ SAME THICKNESS AS BEAM WEB AISC MIN 3 SIDES TYP K+1/2" SCHEDULE 40 PIPE SLEEVE x BEAM FLANGE WIDTH SPAN/6 MAX CL OPENING CL B E A M A N D O P E N I N G CL SPAN NOTES: 1. WHERE ROUND OPENING DIAMETER IS D/6 OR LESS, REINFORCING SHOWN IS NOT REQUIRED. 2. MOMENT FRAME BEAMS, DRAG BEAMS, AND CHORD BEAMS MAY NOT BE PENETRATED WITHOUT STRUCTURAL ENGINEER'S APPROVAL. D 1/4 EA SIDE OF WEB D/2 MAX MIN D/4 3" TYP1 1/2"3" CLR1" 3 " 3" TYP 2" TYP PROVIDE ADDITIONAL (2) 3/4"Ø PUDDLE WELDS DECK TO BEAM AT TOP OF BRACE FOR UNFILLED DECK PLAN SYMBOL PL 3/8", TYP 1/4 1/4 TYP 1/4 3 MIN 1/4 3 MIN CONTRACTOR OPTION IN LIEU OF BOLTS TYP EA ANGLE NOTES: 1. LOCATE BRACING AT MID-SPAN OF GIRDERS, UNO. 2. DESIGNATION ON PLAN. DOUBLE ARROWS POINTS TO BEAM WITH BOTTOM FLANGE BRACE CONNECTION. BEAM PER PLAN CL FRAME BEAM L3x3x3/8 FOR L < 6'-0" L4x4x3/8 FOR 6'-0" < L < 8'-0" (2) L4x4x3/8 FOR 8'-0" < L < 12'-0" METAL DECK PER PLAN CLR 1" 7/8" STITCH BOLTS @ 24" OC W/ 3/8" SPACER AT DOUBLE ANGLES (2) 7/8"Ø A325-N BOLTS AT EA END SEE PLAN FOR BRACE LOCATION 3" TYP1 1/2" MIN, TYP 1 1/2" TYP 1/2" CLR WF BEAM PER PLAN CONNECTING WF PER PLAN AISC STANDARD ROUND HOLES PLATE A PER SCHED (A572 GRADE 50) (2)L3x3x3/8 W/ (2)1"Ø A325-SC BOLTS EA END WHERE Δ > D/3 NOTE: PROVIDE AT ALL BEAMS WHERE INDICATED ON PLANS: FOR SHEAR PL AND BOLTS SEE SCHED ON EQ EQTYP1 1/2"1 MIN 1 1/4 1/4 FULL-HEIGHT STIFFENER PL GIRDER PER PLAN NOTE: BEAM NOT SHOWN FOR CLARITY. tw T&B SEE 1/S8.01 FOR tw D+3 GIRDER WEB OR COLUMN FLANGE FULL HT STIFF, FOR THK SEE SCHED BELOW t BEAM WEB HARDENED WASHER ON BOLT SIDE SEE SKEWED BM CONN SCHED, BELOW, FOR # OF BOLTS AND BOLT SIZE b CONTRACTOR IS NOT TO WELD OR TACK WELD NUTS TO CONNECTION PLATE CJP 4C S7.01 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:36 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL STEEL DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S7.01 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1" = 1'-0"1 STANDARD BOLTED BEAM CONNECTION DETAILS 1A BEAM TO WF COLUMN FLANGE 1B BEAM TO WF COLUMN WEB 1C BEAM TO BEAM W/ FULL-HT STIFF PLATE 1D BEAM TO BEAM 1E W6 OR C6 CONNECTION 1F BEAM TO BEAM SPLICE SCALE : 1" = 1'-0"2 TYPICAL STIFFENER PLATES SCALE : 1" = 1'-0"4 SKEWED BEAM CONNECTION (FOR SKEW ANGLE=0°<b<60°) 4A PLAN SCALE : 1" = 1'-0"5 BEAM WEB OPENING DETAIL SCALE : 1" = 1'-0"6 BEAM WEB ROUND OPENING SCALE : 1" = 1'-0"7 TYPICAL DIAGONAL ANGLE BRACING - METAL DECK SCALE : 1" = 1'-0"3 TYPICAL BRACE DETAIL 4C SECTION FOR (60° ≤ b < 90°) 4B PLAN FOR (60° ≤ b < 90°) No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 NOTES: 1. TOP FLANGE & BOTTOM FLANGE BACK-UP BARS CAN REMAIN UNLESS A FLAW IN THE WELD IS IDENTIFIED BY SPECIAL INSPECTOR. 2. REMOVE RUN OFF TAB AFTER WELD IS COMPLETED. CJP, TYP T&B FLGS CONNECTION PER ,TYP MOMENT PLAN SYMBOL /1 S7.01 3 NOTES: 1. TOP FLANGE & BOTTOM FLANGE BACK-UP BARS CAN REMAIN UNLESS A FLAW IN THE WELD IS IDENTIFIED BY SPECIAL INSPECTOR. 2. REMOVE RUN OFF TAB AFTER WELD IS COMPLETED. CJP, TYP T&B FLGS CONNECTION PER ,TYP MOMENT PLAN SYMBOL /1 S7.01 3 SAME THICKNESS AS BEAM FLANGE MIN 3/4" 5/16" FULL HEIGHT STIFF PL EA SIDE ON COLUMN CENTERLINE CL COL NOTE: WHERE CROSS BEAMS OCCUR, USE FULL HEIGHT STIFFENER OF THE THICKNESS REQUIRED FOR THE CROSS BEAM CONNECTION IN LIEU OF THE 5/16" STIFFENER. (AISC MIN) TYP 1 1/2" TYP 2" 3A POST PER PLAN HOLDOWN/SHEAR WALL ELEVATION MIN, TYP 7 DIA 2" 5/16 TYP HOLD DOWN T.R. HDU2 HDU4 HDU5 5/8"Ø HDU8 7/8"Ø SILL PLATE PER SCHEDULE CONC DECK PER PLAN STIFF PL1/4 AT EA SIDE STL BEAM PER PLAN 3/16NOTE: STIFFENER NOT REQ'D FOR SHEAR WALL SHEAR ANCHOR. AB Ø AND MAX SPACING PER SCHED ON , W/ 5" EMBEDMENT AT DOWN FLUTE /1 S6.06 3 GROUT MIN 2" NON-SHRINK CLCOL PER PLAN PL 1/2" THK TOP OF SLAB OR BEAM 5B MIN 3" CLR 1' - 0" 1/4 MIN CL CL TYP 2" TYP 2" TYP 2" (4) 3/4"Ø A307 BOLT TYP 1" GAGE SQUARE/ROUND HSS COL AT SIM (SLOPED PER PLAN) (4) 7/8"Ø A325-N BOLTS GROUT MIN 2" NON-SHRINKCOL PER PLAN PL 3/4" THK TOP OF SLAB OR BEAM 6B MIN 3" CLR 1' - 0" CL 5/16 CL CL TYP 2 " TYP 2" TYP 2" (6) 1"Ø F 1554 Gr 105, GALV EQ CL BEAM INDICATES SINGLE PLATED DRAG CONNECTION ON PLAN EQ DRAG BEAM TRANSVERSE BEAM CL BEAM INDICATES FULL HT STIFFENER CONNECTION BE USED W/SLIP CRITICAL BOLTS DRAG BEAM TRANSVERSE BEAM NOTE: SEE FOR BALANCE OF INFORMATION. BEAM TO BEAM7A BEAM TO BEAM WITH LETERAL BRACING7B FULL HEIGHT STIFFENER PLATE W/ WT AS INDICATED ON PLANS BY FULL HEIGHT STIFFENER PLATE AS INDICATED ON PLANS BY NOTE: SEE FOR BALANCE OF INFORMATION. 3/4" 1 3/4" 3"1 3/4" 2 LINES OF 1"Ø A490-SC BOLTS SEE SCHED FOR # OF BOLTS 3 /9 S7.02 3 /9 S7.02 BEAM TAB PL CONNECTION W/ BOLTS PER CONCRETE OVER METAL DECK PER PLAN TOP OF SLAB TOP OF STEEL BEAM PER PLAN1/4 (6) 3/4"Ø x5" HEADED STUDS EMBED PLATE 3/4" THK LEDGER ANGLE PER /8 S7.11 5/16 TYP NOTE: SEE FOR ADDL INFO NOT SHOWN./8 S7.11 8B S7.02 /1 S7.01 3 2" 7" 7" 2" 3" 3" 4" 4" CL BEAM * NOTE: * TO AVOID CONFLICT WITH OPPOSITE BEAM'S EMBED PL PER PLAN, IT'S STRUCTURALLY ACCEPTABLE TO SHIFT THE EMBED PLATE BY 1 1/2" MAX FROM THE BEAM CL. 3 3 CL COL PLATE 'A' (A572 GR 50) tw tw 1/2 1/2 TOP & BOTTOM CL COL PLATE 'A' (A572 GR 50) tw tw SINGLE PLATE DRAG CONNECTION SCHEDULE BEAM SIZE BOLTS / LINE PLATE A WELD (tw) W21 W12/W14 W16/W18 3 4 5 1/2" 1/2" 5/8" 5/16" 5/16" 1/2" CL HSS COL K PER AISC + 1/2" TYP 3" (3" MIN) K+1 1/2" MIN TYP 1 1/2" 2"MIN 1 1/2" tw tw HSS PER PLAN WF BEAM DEPTH W8, W10, W12 W14, W16, W18, W21, W24 WT SIZE REQUIRED WT5x15 WT6x43.5 WELD SIZE tw 1/4" 1/4" PER SCHED NO & SIZE OF BOLTS REQUIRED /1 S7.01 PER SCHED /1 S7.01 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:38 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL STEEL DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S7.02 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1" = 1'-0"1 BM TO BM MOMENT CONNECTION SCALE : 1" = 1'-0"2 BM TO BM MOMENT CONN (SAME DEPTH BEAMS) SCALE : 1" = 1'-0"3 HSS COL BEL STEEL BM SCALE : 1" = 1'-0"4 DETAIL SCALE : 1" = 1'-0"5 TYP HSS COL BASE PLATE DETAIL 5A ELEVATION 5B PLAN VIEW 3A SECTION SCALE : 1" = 1'-0"6 SLOPED ROUND HSS COL BASE PLATE DETAIL 6A ELEVATION 6B PLAN VIEW SCALE : 1" = 1'-0"7 BEAM TO BEAM DRAG CONNECTION SCALE : 1" = 1'-0"8 BEAM TO WALL INTERIOR CONNECTION 8B SECTION 9B SECTION9ASECTION SCALE : 1" = 1'-0"9 SINGLE PLATE DRAG CONN (BM TO COLUMN) 3 3 No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 SCALE : 1" = 1'-0"10 BM TO HSS COLUMN USING WT PIECE 3 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 X XX MARK STEEL DECK TYPE GAGE TOTAL THICKNESS (t) CONCRETE TYPE REINFORCING DECK ATTACHMENT END INTERMEDIATE SEAM MARGINAL MAX UNSHORED SPAN SINGLE SPAN DOUBLE SPAN TRIPLE SPAN 3/4" Ø PUDDLE WELD @ 12" OC 3/4" Ø PUDDLE WELD @ 12" OC 3/4" Ø PUDDLE WELD @ 12" OC BUTTON PUNCH @ 36" OC 12'-5"#4 @ 18" OC EWf'c = 4000 PSI LT WT6 1/4"18D1 W3 FORMLOK NOTES: 1. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. 2. SEE TYPICAL CONCRETE DETAILS FOR DEVELOPMENT AND SPLICES OF REINFORCING. 3. SPACING OF DECK SEAM CONNECTING FOR CONCRETE FILLED METAL DECKS SHALL BE REDUCED AS REQUIRED TO PREVENT FAILURE OF CONNECTIONS AS DETERMINED BY DECK MANUFACTURER. D1 3/4" CLR 3 1/4" 3" DECK REINF PER SCHEDULE 14'-10" 14'-7" DOWEL AT CONSTRUCTION JOINT #5x6'-0" @ 12" OC 3/4" Ø PUDDLE WELD @ 12" OC 3/4" Ø PUDDLE WELD @ 12" OC 3/4" Ø PUDDLE WELD @ 12" OC BUTTON PUNCH @ 36" OC 8'-10"#4 @ 18" OC EWf'c = 4000 PSI LT WT4"18D2 PLB 10'-8" 11'-0" #5x6'-0" @ 12" OC D2 1" 1 1/2" 2 1/2" 3 3 3 3 DECK REINF PER SCHEDULE #3 @ 12" EW (UP TO 5" PADS) #4 @ 12" EW (UP TO 9" PADS) #4 @ EDGE OF PAD 12" #4 @ 2'-0" OC MAX (2 PER SIDE MIN) WHERE PAD EDGE IS PARALLEL TO DECK, TURN 90° TO RUN PARALLEL TO FLUTES 4" MIN , 9" MAX CONTRACTOR TO VERIFY W/ MECH, ELECT & ARCH PLANS SLAB REINF PER PLAN ROUGHEN TO 1/4" AMPLITUDE 3/4" CLR AT TOP FLUTE WHERE CONFLICT OCCURS NOTES: 1. DECK SHALL ATTAIN FULL DESIGN STRENGTH PRIOR TO POURING OF PAD. VERIFY WITH SEOR. 2. AT PADS WHERE EPOXY DOWELS ARE USED, PULL TEST 50% OF DOWELS TO 1,625#. 1 " CLR 12" FIELD TOLERANCE 6" MAX FOR S7.11 2A 3/4" EPOXY W/ HILTI HIT-RE 500 V3 INTO DRILLED HOLES 3" CONCRETE OVER METAL DECK PER SCHEDULE WF BEAM PER PLAN REMOVE FORM AT 2ND POUR CONSTRUCTION JOINT DECK REINF PER SCHED CONT ADD BAR TO MATCH, TYP DECK REINF (#5 MIN) DOWEL PER DECK SCHED CENTERED ON C.J. 2ND POUR 1ST POUR EQ EQ 0" CLR CONCRETE OVER METAL DECK PER SCHEDULE WF BEAM PER PLAN, TYP REMOVE FORM BEFORE 2ND POUR CONSTRUCTION JOINT DECK REINF PER SCHED CONT ADD BAR TO MATCH TYP DECK REINF (#5 MIN) DOWEL PER DECK SCHED CENTERED ON CJ 2ND POUR 1ST POUR 0" CLR DECK PERPENDICULAR TO BEAM DECK PARALLEL TO BEAM DETAIL AT GUSSET PL TYP 3" MIN TYP 3" MIN TYP 3" MIN TYP 3" MIN TYP 7/8" MIN 8 STUDS PER FLUTE 7 STUDS PER FLUTE 6 STUDS PER FLUTE 5 STUDS PER FLUTE 4 STUDS PER FLUTE BEAM MIN 4 1/2" MIN 4 1/2" BEAM 1 ROW OF STUDS 2 ROWS OF STUDS DECK 3" TYP 3"MIN TYP 3"MIN MIN 3" TYP 7/8" MIN BEAM 3 STUDS PER FLUTE 2 STUDS PER FLUTE 1 STUD PER FLUTE DECK TYP 7/8" MIN DECK TYP 1 1/2" TYP 7/8" MIN BEAM GUSSET PL WHERE OCCURS MIN 7 /8" NOTES: 1. IF TWO STUDS ARE REQUIRED IN ONE FLUTE, THE TRANSVERSE SPACING SHALL BE 3" MINIMUM. 2. UNLESS NOTED OTHERWISE, ALL BEAMS AND GIRDERS SUPPORTING STRUCTURAL CONCRETE SHALL HAVE HEADED SHEAR STUDS AT 12" OC. 3. STAGGER STUDS AS REQUIRED TO AVOID CONFLICT WITH GUSSET PLATES. 4. DO NOT INSTALL WELDED SHEAR STUDS IN PROTECTED ZONE OF LFRS FRAME BEAMS. PROVIDE ADDITIONAL STUDS OUTSIDE PROTECTED ZONE TO MEET NUMBER OF STUDS IN PARENTHESES. LFRS FRAME BEAMCL COL LFRS FRAME BEAM PER ELEVATION GRID GRID CL COL NO STUD ATTACHMENT PROTECTED ZONE PER LFRS CONN DETAILS IN BETWEEN PROTECTED ZONES [X] STUDS TO BE EVENLY SPACED NO STUD ATTACHMENT PROTECTED ZONE PER LFRS CONN DETAILS DECK PARALLEL TO BEAM CL BM CL COL PROVIDE ADDITIONAL STUDS AT ENDS TO MEET NUMBER REQ'D IN PARENTHESES [X] STUDS SPACE EVENLY OVER BEAM LENGTH SPACING 4 1/2" MIN SPACING 12" MAX STUD MAX 12" CL BM CL COL PROVIDE ADDITIONAL STUDS AT ENDS TO MEET NUMBER REQ'D IN PARENTHESES MAX 12" OUTSIDE DEPRESSION [Z] STUDS, SPACE EVENLY OVER BM LENGTH OUTSIDE OF DEPRESSION [X] STUDS, SPACE EVENLY OVER BM LENGTH DEPRESSION [Y] SHORT SHEAR STUDS AT SLAB SPACING 4 1/2" MIN SPACING 12" MAX STUD DEPRESSION AT BEAM [X] STUDS SPACE EVENLY OVER BEAM LENGTH MAX 12" CL BM CL COL PROVIDE ADDITIONAL STUDS AT ENDS TO MEET NUMBER REQ'D IN PARENTHESES PUDDLE WELD WHERE NO STUD PROVIDED SPACING 12" MAX STUD DECK PERPENDICULAR OR SKEWED TO BEAM LFRS COL PER ELEV CL BM 4" MINPER PLAN SLAB PER PLAN STUD INDICATED BY [#] PER PLAN 3/16 3-12 3/16 3-128" CONT WELD AT EA END Wx BM PER PLAN 3/8" THK MIN BENT PL 2 1/2" 12" MAX MAX 8" SEE ARCH PLAN REACTION FROM WINDOW MULLION, 400 PLF MAX FOR DECK, DECK REINF, DECK ORIENTATION & CONC THICKNESS, SEE PLAN #4 CONT @ 12" OC, 2 ROWS MIN ROUGHEN SURFACE TO 1/4" AMPLITUDE #4 @ 12" OC W/ HILTI EPOXY HIT-RE 500 INTO DRILLED HOLES BEAM PER PLAN 2 1/2" 12" MAX MAX 8" SEE ARCH PLAN P SEE NOTE FOR DECK, DECK REINF, DECK ORIENTATION & CONC THICKNESS, SEE PLAN #4 CONT @ 12" OC, 2 ROWS MIN ROUGHEN SURFACE TO 1/4" AMPLITUDE #4 @ 12" OC W/ HILTI EPOXY HIT-RE 500 INTO DRILLED HOLES BEAM PER PLAN NOTE: P = 400 #/FT (AT STUDS). P = 2000 # (AT MULLION UNFACTORED). L5x3x1/4 (LLV) CONT EA SIDE W/ 3/4"Ø A307 THRU-BOLT @ 12" OC CONC FILL ON METAL DECK, DIRECTION PER PLAN CONC WALL PER PLAN #4 DOWEL @ 12" OC ALTERNATE HORIZ LEG DIRECTION 2" MIN TYP Ld 3/4" CLR PUDDLE WELD PER DECK SCHEDULE (2) ADDITIONAL CONT CHORD BARS. SIZE TO MATCH WALL TYP HORIZONTAL REINF UNO, ON WALL ELEVATION EQ EQ DECK ON BOTH SIDES8A WALL REINF PER PLAN DRAG @ MID-DEPTH, WHERE OCCURS, BAR PER PLAN ROUGHENED TO 1/4" AMPLITUDE MIN 2' - 0" NOTE: FOR DECK TO CONCRETE WALL / PARAPET REFER TO DETAIL S7.12 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:39 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL METAL DECK DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S7.11 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB SCALE : 1" = 1'-0"1 STEEL DECK SCHEDULE SCALE : 1" = 1'-0"2 MECHANICAL PAD ON DECK 2A ALTERNATE DETAIL SCALE : 1" = 1'-0"5 CONSTRUCTION JOINT FOR SLAB 5A JOINT PARALLEL TO DECK 5B JOINT PERPENDICULAR TO DECK SCALE : 1" = 1'-0"7 PLAN STUD SPACING SCALE : 1/2" = 1'-0"9 COMPOSITE BEAM STUD SPACING SCALE : 1" = 1'-0"4 SLOPED DECK SUPPORT DETAIL SCALE : 1" = 1'-0"3 INTERIOR CURB AT METAL DECK (8 IN MAX CURB WIDTH) SCALE : 1" = 1'-0"6 EXTERIOR CURB AT METAL DECK (8 IN MAX CURB WIDTH) SCALE : 1" = 1'-0"8 CONCRETE FILLED DECK TO CONC SHEAR WALL CONN DETAIL No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 2" MIN 1'-0" MAX 2' - 4" 10 CLOSURE PLATE CONT CONC CURB WHERE OCCURS (1) #4 CONT NELSON D2L 1/2"Ø 30 1/8" DEFORMED BAR ANCHOR WELDED TO CLOSURE PL AT EACH WALL FRAMING SUPPORT (16" MAX) EDGE BEAM PER PLAN 3/16 2-12 DECK SCHEDULE SLAB THICKNESS PER NOTES: 1. WELDED REBAR SHALL BE A706 MATERIAL. 2. SEE PLANS AND ELEVATIONS FOR WALL STUD CONNECTIONS. 3. COORDINATE STUD CONNECTIONS TO ALIGN W/ WELDED DOWELS. 4. WELDED DOWEL SPACING TO MATCH WALL STUD SPACING 16" OC MAX SPACING. AT 3" DECK 2'-0" MAX 2' - 4" 10 CLOSURE PLATE CONT CONC CURB WHERE OCCURS (1) #4 CONT UNO EDGE BEAM PER PLAN 3/4 2-12 DECK SCHEDULE SLAB THICKNESS PER DEFORMED BAR ANCHOR PER 1A/- 2'-0" MAX 1/4" CLOSURE PLATE CONT CONC CURB WHERE OCCURS (1) #4 CONT EDGE BEAM PER PLAN 3/16 2-12 3/16 2-12 2" MIN 3/16 3/16TYP EA END L2x2x3/16 CLOSURE SUPPORT @ 4'-0" OC DEFORMED BAR ANCHOR PER 1A/- 2' - 4" 2'-9" MAX EDGE BEAM PER PLAN 3/16 2-12 3/16 2-12 2" MIN 2' - 4" 3/4" BENT PL 1/4" CONT DEFORMED BAR ANCHOR PER DECK PER PLAN WALL STUDS PER SECTION L2x2x3/16 CLOSURE SUPPORT @ 4'-0" OC 3/16 3/16TYP EA END 1" MAX DASHED AT BEAM 1 TO DECK GRID D MAX CANTILEVER (A) DEFORMED BAR ANCHOR SPACING (B) H 2'-8" 3'-3" 12" OC 8" OC 1A/- WALL STUDS PER SECTION NOTES: 1. REF FOR DIMENSIONS REQUIREMENTS WHERE ADJACENT HOLES MUST BE CONSIDERED AS ONE OPENING. 2. IF THE OPENING OR GROUP OF OPENINGS OCCURS IN ONE DECKING UNIT, THE OPENING OR OPENING GROUP MAY BE CUT PRIOR TO POURING OF CONCRETE. 3. IF, AS SHOWN IN THE DETAIL ABOVE, THE OPENING OR OPENING GROUP CUTS THROUGH TWO DECK UNITS, THE DECKING SHALL NOT BE CUT UNTIL CONCRETE HAS BEEN PLACED AND CURED. A. AT THE TIME OF POURING, SUITABLE SLEEVES OR BULKHEADS SHALL BE PLACED AROUND THE OPENING. 4. WHEN THE MAXIMUM DIMENSION OF AN OPENING OR OPENING GROUP EXCEEDS 24", PLACE HEADER BEAMS AROUND OPENING, NOTIFY ENGINEER FOR DESIGN. /4 S7.12 DECK UNIT DECK UNIT DECK UNIT DECK UNIT 24" MAX (3) FLUTES (3) FLUTES MIN 1 1/2" 24" MAX MIN 1 1/2" BEAM BELOW BEAM BELOW C3x5 PLACED ON TOP OF DECK (2) #4 x 5'-0" DIAGONAL BARS EA CORNER 1/8 1 ADJACENT TO EACH CUT WEB TYP 1/8 1 AT CENTER OF EACH UPPER FLUTE BEYOND OPENING TYP NOTES: 1. DO NOT CUT MORE THAN 3 ADJACENT WEBS FOR 6" AND 8" MODULE DECK. DO NOT CUT MORE THAN 2 ADJACENT WEBS FOR 12" MODULE DECK. 2. HOLES LESS THAN 6" IN DIAMETER AND CUTTING NO MORE THAN 1 WEB NEED NO REINFORCING. 3. CHANNELS SHALL BE PLACED ON TOP OF DECK. 4. IF DIMENSION "A" IS GREATER THAN 4D1, 4D2, OR 32" WHICHEVER IS LARGER, THEN THERE IS NO RESTRICTION ON DIMENSION "B". 5. IF DIMENSION "B" IS GREATER THAN 4D1, 4D2, OR 32" WHICHEVER IS LARGER, THEN THERE IS NO RESTRICTION ON DIMENSION "A". 6. IF DIMENSIONS "A" AND "B" ARE LESS THAN 4D1, 4D2, OR 32" WHICHEVER IS LARGER, THE OPENING GROUP WILL BE CONSIDERED AS A SINGLE HOLE, AND MUST BE REINFORCED AS REQUIRED FOR THE LARGER OPENING. 7. MAXIMUM DIMENSION FOR D2 IS 12". 8. ALL OPENINGS WITHIN 4D1 OR 4D2 CLR OF LFRS BEAMS MAY ONLY BE DONE WITH THE STRUCTURAL ENGINEER'S APPROVAL. 9. WHEN OPENING IS WITHIN 12" OF BEAM FLANGE, ACCEPTABLE TO OMIT CHANNEL NEAREST TO BEAM. D1 "B" "A" D2 TYP 3" MAX SEE NOTE BEAM BELOW C3x5 FLAT TYP WEBS OF DECK EXTEND CHANNEL 3 WEBS PAST OPN'G EACH END, TYP THIS IS CONSIDERED A SINGLE OPENING 1/8 1/2 1/8 1/2 TYP ADJ TO CUT WEB NOTES: 1.FOR BALANCE OF INFO, SEE 2.SEE FOR ALTERNATE EMBED LEDGER ANGLE CONNECTION. S7.12 GRID METAL DECK W/ CONCRETE FILL PER PLAN L5x3x1/4 (LLV) CONT L2 2" MIN /3A S7.12 GRID METAL DECK W/ CONCRETE FILL PER PLAN LEDGER PER CONCRETE WALL PER PLAN REINFORCEMENT PER WALL ELEV #4 DOWEL @ 12" OC ROUGHEN WALL/SLAB ON METAL DECK CONSTRUCTION JOINTS TO MIN 1/4" AMPLITUDE, TYP /---- L2 2' - 0" MIN TYP Ld 2" MIN 3" PER PLAN PER PLAN TOPPING PER ARCH #4 CONT DECK TYPE PER PLAN WF BM PER PLAN DOWELS TO MATCH SLAB REINFORCING 6 1 18" MIN 18" MIN WF BEAM PER PLAN (1) #4 CONT PER PLAN DEPRESSIONEDGE OF DEPRESSION 2" MIN BRG, TYP PER PLAN 3" 1 1/2" TOPPING PER ARCH WHERE OCCURS DOWEL TO MATCH SLAB REINFORCING 18" MIN 18" MIN 6 1 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIEN ARCHITEC CONSULTANT AC C R e v i t 2 0 2 2 h o s t e d b y L O C 2/12/2025 12:03:40 PM Autodesk Docs://2308_SAZ_Hive/2300175_SAZ_KPFF_R22.rvt 2308 TYPICAL METAL DECK DETAILS FEBRUARY 13, 2025 PLAN CHECK SUBMITTAL 02 S7.12 SANTA ANA ZOO 1801 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB 1A DECK PARALLEL TO BEAM - INTERIOR CONDITION 1B DECK PERPENDICULAR TO BEAM - INTERIOR CONDITION 1C DECK PARALLEL TO BEAM - INTERIOR CONDITION 1D FLOOR DECK PARALLEL & PERPENDICULAR TO BEAM - EXTERIOR CONDITION/WHERE WALL STUDS OCCUR SCALE : 1" = 1'-0"2 COMPOSITE DECK REINFORCING AT PENETRATIONS > 13" SCALE : 1" = 1'-0"4 DECK SLEEVE DETAIL SCALE : 1" = 1'-0"3 CONCRETE FILLED DECK TO CONC SHEAR WALL CONN DETAIL SCALE : 1" = 1'-0"1 EDGE OF CONCRETE FILLED DECK 3B WALL PERPENDICULAR TO DECK 3 3A WALL PARALLEL TO DECK No. Description Date 3 PLAN CHECK SUBMITTAL 02 02-13-2025 SCALE : 1" = 1'-0"5 SECTION AT SLAB DEPRESSION (3" TO 1 1/2" DECK) PARALLEL TO BEAM SCALE : 1" = 1'-0"6 SECTION AT SLAB DEPRESSION (3" TO 1 1/2" DECK) PERPENDICULAR TO BEAM REGISTERED PROFESSIONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 2/13/2025 PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:04:41 PM 2308 GREEN CODE COMPLIANCE MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.7.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:04:44 PM 2308 GREEN CODE COMPLIANCE MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.7.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:04:47 PM 2308 GREEN CODE COMPLIANCE MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.7.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:04:53 PM 2308 BLDG A TITLE 24 REPORT MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.8.1 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:04:58 PM 2308 BLDG A TITLE 24 REPORT MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.8.2 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:05:03 PM 2308 BLDG A TITLE 24 REPORT MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.8.3 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:05:08 PM 2308 BLDG B TITLE 24 REPORT MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.8.4 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:05:14 PM 2308 BLDG B TITLE 24 REPORT MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.8.5 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date PROJECT COPYRIGHT LOC, INC ORIGINAL SHEET SIZE: 42" X 30" LOC CLIENT: ARCHITECT: CONSULTANTS: PREPARED UNDER THE SUPERVISION OF: ALI JEEVANJEE LOC ARCHITECTS DATE REVIEWED FOR CONSTRUCTABILITY: SEAN THOMAS PRINCIPAL CIVIL ENGINEER RCE NO.: 80470 DATE RECOMMENDED FOR CONSTRUCTION: JASON GABRIEL PRINCIPAL CIVIL ENGINEER RCE NO.: 62968 DATE 3/28/2025 6:05:19 PM 2308 BLDG B TITLE 24 REPORT MARCH 28, 2025 PLAN CHECK SUBMITTAL 02 G0.8.6 SANTA ANA ZOO 1821 & 1823 E CHESTNUT AVE, SANTA ANA, CA 92701 KPFF STRUCTURAL ENGINEER LOC ARCHITECTS KPFF CIVIL ENGINEER BORDER LANDSCAPE ARCHITECT ABRARI AND ASSOCIATES MEP ENGINEER ASSOCIATED SOILS ENGINEERING GEOTECHNICAL ENGINEER 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Ramzi.hodali@kpff.com 700 S. FLOWER, SUITE 2100 LOS ANGELES, CA 90017 213 372 5111 Sharad.Ganju@kpff.com 724 S. SPRING ST, SUITE 701 LOS ANGELES, CA 90014 213 372 5111 Darren@border-la.com 1713 S. STANDARD AVE GLENDALE, CA 91201 818 956 1900 Telma@abrari.com 2860 WALNUT AVE. SIGNAL HILL, CA 90755 562 897 2749 Ted@associatedsoils.com 3203 E. 4TH ST LOS ANGELES, CA 90063 213 537 0480 Office@loc-arch.com 1801 E. CHESTNUT AVE. SANTA ANA, CA 92701 714 647 6575 Efisher@santa-ana.org SANTA ANA ZOO EDUCATION HUB MARCH 28, 2025 25 No.Description Date SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX ABBREVIATIONS LEGEND OF SYMBOLSMATERIALINSTALLATIONGENERAL NOTES START-UP ELECTRICAL CODE GREEN BLDG. NOTES ¾ RECEPT. MOUNTING HEIGHT PROJECT SCOPE STAMP ANY DISCREPANCIES WITHIN THE ELECTRICAL PLANS NOTED BEFORE BIDDING AND ORDERING OF EQUIPMENT & MATERIALS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD FOR CORRECTION.E-1.0 NONE SYMBOLS NOTES & SINGLE LINE DIAGRAM1 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX SWITCHBOARD ELEVATION2 E-2.0 AS SHOWN LOAD CALCS. DIAGRAM & SINGLE LINE MAIN SWITCHBOARD "MS" M GROUNDING DETAILA SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-2.1 AS SHOWN SCHEDULES PANEL SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-2.2 AS SHOWN SCHEDULE FIXTURES Lutron Dimmer Pico Wired PX Power Pack (Ltg)ESN QSN-4T20-S (0-10V) Power Pack (Emerg.)WattStopper ELCU-200 Power Pack (Recep.)ESN QSN-4S20-S Occupancy Sensor Radio Powr Savr LRF2-OCR2B-P Photo Sensor Radio Powr Savr LRF2-DCRB OP OS LI N E OS LOW PC VS EXIT EXIT SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-2.3 AS SHOWN SCHEDULE SWITCH CONTROL SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX SITE ELECTRICAL PLAN1 E-3.0 1/16"=1'-0" SITE ELECTRICAL PLANCONTRACTOR NOTES: 1.PROVIDE 12" CLEARANCE BETWEEN ALL UTILITIES WHEN PARALLEL AND 6" CLEARANCE WHEN CROSSING. 2.PROVIDE 32" MINIMUM COVERAGE FOR ALL UTILITIES. 3.CALL FOR INSPECTION FOR RESPECTIVE UTILITY BEFORE BACKFILL. SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX EXTERIOR LIGHTING PLAN1 E-3.1 3/32"=1'-0" EXTERIOR LIGHTING PLAN SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-4.0 1/4"=1'-0" LIGHTING PLAN BUILDING A 1ST. FLR. FIRST FLOOR LIGHTING PLAN (BUILDING A)1 PRIMARY ZONE SECONDARY ZONE SE C O N D A R Y Z O N E SE C O N D A R Y Z O N E PR I M A R Y Z O N E PR I M A R Y Z O N E OP OP OP OP EXIT EX I T EX I T EX I T OS LINE SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-4.0 3/16"=1'-0" PLAN LIGHTING 1ST. FLR. FIRST FLOOR LIGHTING PLAN (BUILDING A)1 EXIT EXIT EXIT VS VS VS VS VS VS OS LOW OS LOW EM PRIMARY ZONE SECONDARY ZONE SE C O N D A R Y Z O N E SE C O N D A R Y Z O N E PR I M A R Y Z O N E PR I M A R Y Z O N E OP OP OP OP FIRST FLOOR LIGHTING PLAN (BUILDING B)2 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-4.1 POWER PLAN 1/4"=1'-0" BUILDING A 1ST. FLR. FIRST FLOOR POWER PLAN (BUILDING A)1 SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-4.1 PLAN 3/16"=1'-0" POWER 1ST. FLR. FIRST FLOOR POWER PLAN (BUILDING A)1 FIRST FLOOR POWER PLAN (BUILDING B)2 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-4.2 L.V. PLAN 1/4"=1'-0" BUILDING A 1ST. FLR. FIRST FLOOR LOW VOLTAGE PLAN (BUILDING A)1 SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-4.2 AS SHOWN PLAN CONTROL LIGHTING 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-4.3 AS SHOWN PLAN CONTROL LIGHTING EXIT EXIT EXIT VS VS VS VS VS VS OS LOW OS LOW FIRST FLOOR LIGHTING PLAN (BUILDING B)1 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-5.0 1/4"=1'-0" LIGHTING PLAN BUILDING B 1ST. FLR. SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-5.0 3/16"=1'-0" PLAN ELECTRICAL 2ND FLR. SECOND FLOOR POWER PLAN (BUILDING B)2 SECOND FLOOR LIGHTING PLAN (BUILDING B)1 EX I T EX I T EXIT EX I T EX I T EX I T OS LINE OS LINE VS VS VS VS VS VS VS VS VS VS OS LOW OS LOW OS LOW OS LOW EM OS LOW 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 FIRST FLOOR POWER PLAN (BUILDING B)1 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-5.1 POWER PLAN 1/4"=1'-0" BUILDING B 1ST. FLR. SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-5.1 AS SHOWN PLAN CONTROL LIGHTING 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 FIRST FLOOR LOW VOLTAGE PLAN (BUILDING B)1 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-5.2 L.V. PLAN 1/4"=1'-0" BUILDING B 1ST. FLR. SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-5.3 AS SHOWN PLAN CONTROL LIGHTING SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-6.0 1/4"=1'-0" LIGHTING PLAN BUILDING B 2ND FLR. SECOND FLOOR LIGHTING PLAN (BUILDING B)1 EX I T EX I T EXIT EX I T EX I T EX I T OS LINE OS LINE VS VS VS VS VS VS VS VS VS VS OS LOW OS LOW OS LOW OS LOW OS LOW OS LOW SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX TITLE 24 ENERGY CALCULATIONS NONE E-6.0 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 SECOND FLOOR POWER PLAN (BUILDING B)1 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-6.1 1/4"=1'-0" POWER PLAN BUILDING B 2ND FLR. SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX TITLE 24 ENERGY CALCULATIONS NONE E-6.1 TIME CLOCK & RELAY PANEL LIGHTING CONTROL SCHEMATIC1 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-6.2 1/4"=1'-0" L.V. PLAN BUILDING B 2ND FLR. SECOND FLOOR LOW VOLTAGE PLAN (BUILDING B)1 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-6.3 AS SHOWN PLAN CONTROL LIGHTING SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX 8.9 9.9 10.6 11.1 11.7 12.6 14.0 16.1 19.9 23.7 25.7 10.6 11.7 12.6 13.2 13.7 14.5 15.9 18.4 22.1 26.0 28.4 28.2 25.4 20.4 8.8 9.9 10.6 11.1 11.7 12.7 14.3 17.1 20.8 23.6 24.9 23.9 21.3 13.1 14.4 15.5 16.2 16.4 16.8 17.8 19.9 23.3 27.0 29.4 29.1 26.2 22.2 10.8 12.0 12.8 13.2 13.7 14.5 16.2 19.0 22.7 26.1 27.6 26.4 22.9 18.5 15.0 15.7 17.8 19.4 20.1 19.8 19.3 19.4 20.8 23.3 26.2 28.1 27.8 25.3 21.8 18.7 16.8 16.1 15.6 16.0 16.4 16.6 16.4 16.7 17.8 20.1 23.5 26.8 28.3 26.9 23.4 19.1 15.4 18.3 21.4 23.8 24.4 23.4 21.9 20.8 21.0 22.4 24.2 25.4 25.0 23.1 20.6 18.6 17.6 17.6 18.5 19.8 20.7 20.5 19.7 18.9 19.0 20.5 22.9 25.5 26.6 25.3 22.2 18.4 15.1 20.3 24.2 27.2 27.9 26.2 23.8 21.8 21.1 21.5 22.3 22.8 22.4 21.1 19.4 18.3 18.1 19.2 21.2 23.5 25.0 24.7 23.0 21.1 20.0 20.3 21.6 23.0 23.6 22.5 20.0 17.0 14.4 21.0 25.2 28.3 29.0 27.2 24.5 22.3 21.3 21.2 21.5 21.6 21.1 20.0 18.8 18.2 18.6 20.3 23.2 26.4 28.3 27.9 25.5 22.7 20.7 20.1 20.4 21.0 20.9 20.0 18.0 15.7 13.5 20.3 24.0 26.8 27.5 26.1 23.9 22.2 21.5 21.6 21.9 22.0 21.2 20.0 18.8 18.3 18.9 20.7 23.8 27.2 29.3 28.9 26.4 23.3 21.1 20.1 19.9 20.1 19.8 18.7 16.9 14.9 18.8 21.7 23.8 24.5 23.8 22.6 21.8 22.0 22.9 23.8 23.9 22.9 21.1 19.4 18.5 18.7 20.3 22.9 25.9 27.7 27.4 25.3 22.9 21.2 20.6 20.7 20.8 20.3 19.0 17.0 14.8 17.4 19.5 21.1 21.8 21.6 21.4 21.6 22.9 24.8 26.5 26.9 25.5 22.9 20.3 18.8 18.5 19.3 21.2 23.3 24.6 24.5 23.3 21.9 21.2 21.5 22.3 23.0 22.5 20.7 18.1 15.4 16.9 18.6 19.9 20.5 20.5 20.8 21.6 23.6 26.4 28.8 29.4 27.7 24.4 21.1 19.0 18.2 18.5 19.7 21.1 21.9 21.9 21.5 21.0 21.4 22.7 24.6 25.9 25.5 23.2 19.7 16.3 15.5 17.4 19.2 20.4 20.8 20.6 20.7 21.5 23.6 26.5 29.1 28.0 24.5 21.1 18.9 17.9 18.1 19.0 20.1 20.7 20.7 20.5 20.6 21.5 23.6 26.2 28.2 27.9 25.1 20.9 16.9 16.4 18.9 21.2 22.6 22.6 21.8 21.1 21.2 22.6 24.8 27.0 27.5 25.9 23.0 20.1 18.4 17.9 18.3 19.5 20.7 21.3 21.1 20.7 20.6 21.4 23.5 26.2 28.2 27.9 25.1 20.8 16.8 17.8 21.1 24.1 25.8 25.3 23.6 21.7 20.6 20.8 21.9 23.1 23.4 22.2 20.3 18.5 17.6 17.9 19.1 21.1 22.8 23.5 22.9 21.7 20.8 20.9 22.2 24.1 25.6 25.3 22.8 19.2 15.6 18.8 22.8 26.4 28.3 27.5 24.9 21.8 19.7 18.7 18.7 19.0 19.0 18.3 17.3 16.6 16.8 18.0 20.3 23.3 25.8 26.6 25.5 23.3 21.1 20.0 20.1 20.9 21.6 21.1 19.2 16.5 13.9 18.9 23.0 26.8 28.7 27.8 24.7 21.1 18.3 16.6 15.7 15.5 15.2 14.7 14.3 14.5 15.9 17.9 21.0 25.0 28.1 29.1 27.5 24.3 21.1 18.9 17.8 17.6 17.5 16.8 15.5 13.8 12.1 18.0 21.6 24.9 26.6 25.7 23.0 19.5 16.5 14.4 13.2 12.5 11.9 11.1 10.2 9.1 25.2 28.3 29.2 27.5 23.9 20.2 17.4 15.7 14.7 14.2 13.5 12.6 11.5 10.4 19.1 21.5 23.0 22.4 20.4 17.6 14.2 12.3 11.1 10.3 9.7 9.2 8.5 22.8 26.2 26.9 25.3 22.1 18.6 15.6 13.7 12.5 11.7 11.1 10.4 9.8 9.2 23.1 22.0 19.7 16.8 13.6 11.9 10.8 10.0 9.5 9.0 8.5 8.2 7.5 29.8 12.2 11.7 12.0 12.3 11.7 16.1 13.2 14.5 13.5 13.4 14.3 12.7 9.7 9.3 9.8 11.6 11.6 11.5 11.1 10.5 10.6 13.3 13.5 15.9 16.7 15.7 15.6 15.8 14.5 16.6 16.4 14.2 13.3 14.5 14.3 17.1 19.7 20.5 18.6 12.7 16.2 17.1 16.4 18.6 18.9 18.3 18.7 18.7 16.7 14.3 15.6 15.6 18.3 20.8 19.2 10.4 13.9 14.7 16.7 19.3 19.6 18.8 18.7 14.0 13.7 16.2 19.2 9.1 21.0 Statistics Description Symbol Avg Max Min Max/Min Avg/Min Calc Zone #3 15.1 fc 21.0 fc 9.1 fc 2.3:1 1.7:1 Calc Zone #2 20.4 fc 29.8 fc 7.5 fc 4.0:1 2.7:1 E-7.0 3/16"=1'-0" PLAN PHOTOMETRIC 1ST FLR. EM. FIRST FLOOR EMERGENCY PHOTOMETRIC PLAN (BUILDING A)1 FIRST FLOOR EMERGENCY PHOTOMETRIC PLAN (BUILDING B)2 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX TITLE 24 ENERGY CALCULATIONS NONE E-7.0 3.7 5.0 5.1 11.7 7.1 8.3 8.4 11.9 12.4 8.8 10.0 10.2 10.7 11.3 10.4 11.0 11.1 10.0 9.2 10.3 10.4 9.4 9.7 9.4 9.0 9.1 8.1 10.8 11.0 6.2 6.6 5.4 13.5 14.5 14.1 12.4 12.0 12.4 8.0 8.8 8.3 12.4 13.2 13.2 11.6 12.1 12.5 9.9 10.6 10.1 12.5 11.7 11.0 9.8 8.1 10.7 11.1 10.2 11.3 12.0 11.2 13.2 11.7 9.5 8.9 8.1 7.0 9.4 8.5 11.9 12.2 12.5 10.1 7.9 7.5 7.0 6.4 8.8 8.7 11.0 11.7 10.8 7.9 7.0 6.8 6.9 6.7 10.3 10.4 9.7 10.2 8.2 6.9 6.8 8.3 9.9 10.1 11.5 11.6 9.8 7.6 4.1 3.4 3.5 6.7 9.5 10.5 10.1 8.4 7.7 10.4 11.5 11.8 11.7 11.7 10.3 8.0 4.4 3.7 4.6 8.7 10.7 11.6 11.4 10.4 9.6 11.0 12.3 12.9 11.9 10.4 10.6 7.1 4.1 3.9 5.5 9.2 11.3 12.5 12.1 10.7 10.1 10.8 12.0 12.4 11.5 9.0 7.9 5.2 4.1 3.9 5.3 8.6 10.8 11.9 11.6 10.2 8.2 9.4 8.7 8.5 6.9 4.4 3.8 4.1 7.0 9.6 10.5 10.2 10.2 10.2 8.9 6.5 3.8 3.5 3.6 5.7 8.8 8.6 11.4 11.4 9.3 9.8 11.2 11.3 10.6 11.3 9.6 9.7 11.3 12.2 11.4 6.8 7.2 6.0 11.4 10.8 3.2 3.0 9.7 9.3 2.5 2.5 7.0 6.1 4.5 2.5 4.4 4.4 4.6 3.3 3.0 6.6 8.8 8.0 6.1 7.9 15.4 13.4 10.6 10.0 12.6 15.7 17.6 17.8 18.5 18.6 18.6 18.4 16.7 12.4 15.8 18.4 19.4 19.7 19.9 19.8 18.9 17.3 12.8 10.1 16.0 18.4 18.8 19.3 18.4 17.8 17.2 16.9 15.1 11.1 9.0 12.8 15.7 16.1 14.2 14.6 13.8 11.9 12.6 10.4 8.5 6.3 9.2 10.2 10.6 9.3 8.2 6.9 6.5 5.6 5.1 4.4 3.7 4.6 4.8 4.8 4.8 4.6 4.4 4.2 3.9 3.6 3.1 3.4 3.5 2.4 20.8 Statistics Description Symbol Avg Max Min Max/Min Avg/Min Calc Zone #1 9.7 fc 20.8 fc 2.4 fc 8.7:1 4.0:1 SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-7.1 3/16"=1'-0" PLAN PHOTOMETRIC 2ND FLR. EM. SECOND FLOOR EMERGENCY PHOTOMETRIC PLAN (BUILDING B)1 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX TITLE 24 ENERGY CALCULATIONS NONE E-7.1 TIME CLOCK & RELAY PANEL LIGHTING CONTROL SCHEMATIC1 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX 9.7 10.4 11.0 11.7 12.5 13.8 15.7 19.1 11.5 12.4 13.1 13.7 14.4 15.7 17.9 21.4 25.5 28.6 29.2 26.9 22.6 18.6 15.7 13.9 13.0 12.6 12.6 12.8 13.1 13.8 15.1 17.2 20.6 24.2 25.9 25.5 23.0 14.1 15.3 16.0 16.4 16.6 17.5 19.3 22.4 26.3 29.3 29.8 27.5 23.5 19.6 16.7 15.1 14.4 14.4 14.6 14.9 15.1 15.7 17.0 19.3 22.7 26.4 28.6 28.0 24.7 20.2 16.1 17.4 19.1 20.0 19.8 19.3 19.3 20.2 22.4 25.3 27.7 28.1 26.1 22.8 19.6 17.3 16.3 16.3 16.8 17.5 17.8 17.7 17.9 18.7 20.6 23.7 27.0 29.1 28.4 25.0 20.5 16.5 20.8 23.3 24.4 23.7 22.1 20.9 20.7 21.6 23.3 24.8 24.9 23.5 21.1 19.0 17.7 17.6 18.4 20.0 21.3 21.7 21.1 20.4 20.1 21.1 23.2 25.7 27.2 26.4 23.5 19.6 16.0 23.5 26.7 28.0 26.9 24.4 22.1 20.9 20.9 21.5 22.1 22.1 21.1 19.5 18.3 17.9 18.7 20.7 23.3 25.4 25.9 24.7 22.8 21.4 21.2 22.1 23.4 24.1 23.2 20.9 17.9 15.0 20.4 24.5 27.9 29.3 28.1 25.3 22.7 21.1 20.6 20.8 21.0 20.7 19.8 18.7 18.0 18.2 19.6 22.3 25.7 28.5 29.1 27.3 24.6 22.2 21.1 20.9 21.2 21.3 20.4 18.6 16.3 14.1 19.9 23.6 26.7 28.0 27.0 24.7 22.5 21.3 21.1 21.3 21.5 21.0 19.9 18.7 18.1 18.3 19.9 22.8 26.4 29.2 28.0 25.1 22.5 21.1 20.6 20.4 20.1 19.0 17.4 15.4 13.5 18.7 21.5 23.9 25.0 24.5 23.1 22.0 21.7 22.3 23.1 23.5 22.8 21.2 19.5 18.4 18.3 19.5 21.9 25.0 27.5 28.1 26.6 24.3 22.3 21.3 21.1 21.0 20.6 19.3 17.4 15.3 13.4 17.5 19.5 21.2 22.1 22.1 21.6 21.5 22.3 24.0 25.8 26.7 25.7 23.4 20.8 18.9 18.2 18.8 20.5 22.7 24.4 24.9 24.1 22.8 21.9 21.9 22.5 23.0 22.7 21.1 18.6 15.9 13.6 16.9 18.6 20.0 20.7 20.8 20.8 21.4 22.9 25.5 28.1 29.4 28.2 25.2 21.8 19.3 18.1 18.1 19.1 20.6 21.7 22.1 21.9 21.5 21.7 22.8 24.5 25.9 25.8 23.7 20.4 16.9 14.1 17.3 19.1 20.4 20.9 20.8 20.8 21.3 23.0 25.7 28.6 28.7 25.6 21.9 19.3 18.0 17.8 18.6 19.7 20.5 20.8 20.7 20.9 21.6 23.5 26.1 28.1 28.2 25.8 21.7 17.6 14.4 18.6 20.8 22.4 22.8 22.2 21.4 21.2 22.3 24.4 26.7 27.8 26.7 24.0 20.9 18.8 17.8 18.0 19.0 20.2 21.0 21.1 20.8 20.8 21.5 23.4 26.1 28.2 28.4 25.9 21.7 17.5 14.3 20.4 23.5 25.5 25.7 24.3 22.4 21.1 21.0 22.0 23.2 23.8 23.0 21.1 19.1 17.9 17.7 18.6 20.3 22.1 23.1 22.9 21.9 21.1 21.1 22.3 24.2 25.9 25.9 23.6 20.0 16.4 21.9 25.7 28.3 28.3 26.1 23.1 20.6 19.4 19.2 19.5 19.6 19.1 18.0 17.0 16.8 17.6 19.5 22.2 24.9 26.2 25.6 23.7 21.6 20.4 20.4 21.2 22.0 21.7 20.0 17.3 14.6 22.3 26.4 29.1 29.0 26.4 22.8 19.7 17.7 16.7 16.4 16.2 15.9 15.4 15.2 15.8 17.3 20.0 23.7 27.2 28.8 27.9 25.1 21.9 19.5 18.4 18.0 18.0 17.4 16.2 14.4 12.7 21.2 24.8 27.3 27.2 24.8 21.3 18.1 15.9 14.7 14.0 13.7 13.5 13.4 13.7 14.7 16.7 19.8 23.8 27.6 29.5 28.4 25.1 21.4 18.3 16.4 15.3 14.7 14.0 13.1 12.0 10.9 14.0 12.9 12.2 11.9 11.8 11.9 12.4 13.6 15.5 18.4 22.2 25.9 27.6 26.6 23.6 19.9 16.6 14.4 13.0 12.2 11.5 10.8 10.1 9.5 11.0 10.3 9.7 9.2 8.7 8.3 29.9 29.9 Statistics Description Symbol Avg Max Min Max/Min Avg/Min Calc Zone #3 20.7 fc 29.9 fc 8.3 fc 3.6:1 2.5:1 E-8.0 3/16"=1'-0" EM. PHM PLAN BUILDING A 1ST FLR. FIRST FLOOR EMERGENCY PHOTOMETRIC PLAN (BUILDING A)1 11.3 11.6 10.3 9.1 5.0 12.3 12.5 11.2 12.9 7.6 11.5 11.7 10.4 15.5 11.3 12.7 12.3 13.0 11.2 7.7 6.6 6.5 6.3 5.9 5.6 5.2 13.1 13.9 15.3 15.6 12.5 12.9 11.7 11.4 12.4 11.0 10.3 7.7 12.1 14.9 16.9 16.7 16.3 17.5 16.7 16.3 17.1 15.9 13.3 13.9 14.8 14.6 18.1 18.9 18.1 10.3 14.2 16.2 15.9 18.4 19.5 19.3 19.3 19.4 18.5 15.2 15.8 16.3 15.9 19.3 18.9 15.0 6.5 10.2 12.8 14.5 17.9 19.3 19.0 18.9 19.3 18.3 15.0 14.7 15.4 14.2 17.5 18.3 4.2 19.9 Statistics Description Symbol Avg Max Min Max/Min Avg/Min Calc Zone #3 13.8 fc 19.9 fc 4.2 fc 4.7:1 3.3:1 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-8.1 3/16"=1'-0" EM. PHM PLAN BUILDING B 1ST FLR. FIRST FLOOR EMERGENCY PHOTOMETRIC PLAN (BUILDING B)1 2.0 2.2 2.1 22.6 3.8 5.7 6.0 23.2 25.9 7.9 10.9 11.8 17.4 19.9 15.0 19.7 21.1 11.4 9.8 23.5 24.8 17.9 9.5 8.8 18.2 19.3 14.2 10.1 10.3 11.7 13.9 15.5 11.8 13.8 14.9 14.4 12.7 11.6 12.0 11.7 14.3 14.7 14.6 13.5 13.8 13.2 11.6 9.7 12.0 12.4 12.0 13.8 14.9 15.2 14.2 11.9 11.1 9.8 8.1 10.7 11.2 10.3 12.5 14.3 15.1 14.7 13.3 10.1 9.2 8.2 7.1 9.5 8.7 13.6 14.1 13.5 11.8 8.6 7.9 7.2 6.6 8.7 8.5 12.0 12.4 11.7 9.7 7.5 7.3 7.5 7.6 10.1 10.3 9.6 10.4 9.4 7.5 7.2 9.0 10.5 10.7 11.4 11.4 9.7 7.4 3.8 3.0 3.0 5.5 8.6 10.2 10.4 9.5 8.2 10.7 11.8 12.2 11.7 11.7 10.2 7.9 4.2 3.2 3.7 7.1 9.8 11.2 11.5 10.9 10.8 11.1 12.4 13.1 12.4 10.5 10.6 9.5 7.2 3.9 3.5 4.2 7.8 10.1 11.7 12.0 11.2 10.8 10.6 11.6 12.1 11.3 8.6 9.1 8.0 5.2 3.8 3.6 4.0 7.3 9.6 10.9 11.2 10.5 9.1 8.7 10.0 10.3 9.5 8.5 8.1 6.4 4.1 3.6 3.6 5.4 8.1 9.1 9.2 8.4 10.0 10.0 8.7 6.3 3.6 2.6 3.0 4.7 6.2 6.3 4.4 11.3 11.3 9.8 1.9 2.0 2.2 2.6 2.6 2.4 11.5 11.4 1.9 1.9 1.8 10.0 9.9 8.7 1.5 1.5 1.5 7.2 7.5 6.3 1.4 1.3 3.4 3.0 1.4 1.4 1.3 2.4 2.4 1.6 1.6 1.9 2.1 2.2 2.2 3.4 3.2 2.8 2.5 5.6 8.7 8.4 5.8 7.7 16.0 18.3 16.5 10.7 15.6 17.9 17.2 17.4 17.1 17.9 22.0 28.1 24.9 26.6 26.9 21.6 20.5 18.6 18.3 18.9 22.1 27.9 24.5 16.5 28.9 22.2 19.3 17.5 16.6 15.7 17.2 18.8 15.6 10.8 20.6 21.7 17.6 14.5 13.8 13.0 10.7 11.5 10.2 8.6 6.5 10.7 11.4 11.4 8.9 7.6 6.3 5.9 5.0 4.4 3.9 3.1 5.2 5.2 4.6 4.4 4.2 4.0 3.8 3.5 3.1 2.8 2.5 2.7 3.0 3.2 3.2 1.2 29.4 Statistics Description Symbol Avg Max Min Max/Min Avg/Min Calc Zone #2 10.1 fc 29.4 fc 1.2 fc 24.5:1 8.4:1 SECOND FLOOR EMERGENCY PHOTOMETRIC PLAN (BUILDING B)1 SHEET TITLE 4325 DATE: DRAWING NO. SCALE: 03-25-25 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:03-25-25 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-8.2 1/4"=1'-0" EM. PHM PLAN BUILDING B 2ND FLR. SHEET TITLE 3652 DATE: DRAWING NO. SCALE: 02-10-24 BY:YK CHECKED:HRA PR O J E C T A L L I D E A S , D E S I G N S , A R R A N G E M E N T S A N D P L A N S I N D I C A T E D O R R E P R E S E N T E D B Y T H I S D R A W I N G A R E O W N E D B Y A B R A R I A N D A S S O C I A T E S A N D W E R E C R E A T E D A N D D E V E L O P E D F O R U S E A N D I N C O N N E C T I O N W I T H T H E S P E C I F I E D P R O J E C T . N O N E O F T H E I D E A S , D E S I G N S , A R R A N G E M E N T S O R P L A N S S H A L L B E U S E D B Y O R D I S C L O S E D T O F O R A N Y P U R P O S E W H A T S O E V E R W I T H O U T T H E W R I T T E N A U T H O R I Z A T I O N O F A B R A R I A N D A S S O C I A T E S I N C . RE V . DA T E A B C D DE S C R I P T I O N XX XXBY R D EXP. 03-31-26 O E NO. 13294E TE S R EL AT ST I E G MI A H DER P E IA LCFA OFI I CTCR LA RN ER GNE O SEFSI AR. RB AR I NAO L IN PROJECT NO.: DATE SIGNED:02-10-24 A B R A R I 1 7 1 3 S T A N D A R D A V E . G L E N D A L E , C A 9 1 2 0 1 W 8 1 8 .9 5 6 .1 9 0 0 M A I L @ A B R A R I .C O M E L E C T R I C A L E N G I N E E R S A S S O C I A T E S PLUMB CHKD X LID CHKD DATE BY MECH CHKD X X X X X CUST. OK'D X X SA Z H I V E 18 0 1 E . C H E S T N U T A V E . , SA N T A A N A , C A 9 2 7 0 1 XX E-2.1 AS SHOWN SCHEDULES PANEL 10-30-2024 18 2 1 & 1 8 2 3 E C H E S T N U T A V E 11.26.2024 M-001 NO T E S , L E G E N D SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m ALL SUPPLY DIFFUSER AND RETURN GRILLE SIZES SHOWN ARE THE OPENINGS WITHOUT BORDER. CONTRACTOR SHALL SUBMIT SHOP DRAWING AND RECEIVE APPROVAL FROM THE ARCHITECT BEFORE PLACING ORDER ALL DUCTS SHALL BE RIGID SHEET METAL, ONLY LAST 3 FT OF DUCT CAN BE FLEXIBLE DUCT. M-002 SC H E D U L E S SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m NOTE: EQUIPMENT SHALL BE SAMSUNG OR APPROVED EQUAL. ALL SUBSTITUTIONS SHALL BE MADE ALONG WITH EQUIPMENT SELECTION, WIRING DIAGRAM AND PIPING DIAGRAM M-003 SC H E D U L E S SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m 1 1 M-004 SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SP E C I F I C A T I O N S M-005 SP E C I F I C A T I O N S SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SECTION 232301 - VRV/VRF REFRIGERANT PIPING PART 1 - GENERAL 1.1 SUMMARY A. THIS SECTION INCLUDES REFRIGERANT PIPING USED FOR VRV/VRF AIR-CONDITIONING APPLICATIONS. 1.2 PERFORMANCE REQUIREMENTS A. LINE TEST PRESSURE FOR REFRIGERANT R-410A: 1. SUCTION (LOW PRESSURE GAS) LINES: 550 PSIG, OR PER EQUIPMENT MANUFACTURERS RECOMMENDATION. 2. HOT-GAS (HIGH PRESSURE GAS) AND LIQUID LINES: 550 PSIG, OR PER EQUIPMENT MANUFACTURERS RECOMMENDATION. 1.3 SUBMITTALS A. PRODUCT DATA: FOR EACH TYPE OF VALVE AND REFRIGERANT PIPING SPECIALTY INDICATED. INCLUDE PRESSURE DROP BASED ON MANUFACTURER'S TEST DATA. B. SHOP DRAWINGS: SHOW LAYOUT OF REFRIGERANT PIPING AND SPECIALTIES, INCLUDING PIPE, TUBE, AND FITTING SIZES, VALVE ARRANGEMENTS AND LOCATIONS, WALL AND FLOOR PENETRATIONS, AND EQUIPMENT CONNECTION DETAILS. SHOW INTERFACE AND SPATIAL RELATIONSHIPS BETWEEN PIPING AND EQUIPMENT. 1. REFRIGERANT PIPING INDICATED ON DRAWINGS IS SCHEMATIC ONLY. SIZE PIPING AND DESIGN ACTUAL PIPING LAYOUT, INCLUDING SPECIALTIES, AND PIPE AND TUBE SIZES TO ACCOMMODATE, AS A MINIMUM, EQUIPMENT PROVIDED, ELEVATION DIFFERENCE BETWEEN COMPRESSOR AND EVAPORATOR, AND LENGTH OF PIPING TO ENSURE PROPER OPERATION AND COMPLIANCE WITH WARRANTIES OF CONNECTED EQUIPMENT. C. FIELD QUALITY-CONTROL TEST REPORTS. D. OPERATION AND MAINTENANCE DATA. 1.4 QUALITY ASSURANCE A. COMPLY WITH ASHRAE 15, "SAFETY CODE FOR REFRIGERATION SYSTEMS." B. COMPLY WITH ASME B31.5, "REFRIGERATION PIPING AND HEAT TRANSFER COMPONENTS." C. INSTALLER QUALIFICATION: ONLY TRAINED INSTALLERS SKILLED IN REFRIGERATION PIPE INSTALLATION AND BRAZING OF COPPER TUBING SHOULD BE USED. 1.5 PRODUCT STORAGE AND HANDLING A. STORE PIPING IN A CLEAN AND PROTECTED AREA WITH END CAPS IN PLACE TO ENSURE THAT PIPING INTERIOR AND EXTERIOR ARE CLEAN WHEN INSTALLED. PART 2 - PRODUCTS 2.1 COPPER TUBE AND FITTINGS A. COPPER TUBE: 1. STRAIGHT LENGTHS: ASTM B 75, UNS C12200, H55 TEMPER (LIGHT DRAWN), ACR BENDING QUALITY; CLEANED, EDDY CURRENT TESTED, AND PLUGGED PER ASTM B 280. a. REFTEKK "HHC" 2. COILED: ASTM B 280, UNS C12200, O60 TEMPER (SOFT ANNEALED), ACR, CLEANED AND CAPPED a. REFTEKK "CCE" B. BRAZING FILLER METALS: AWS A5.8. a. REFTEKK "BRG" C. FIELD SWAGED BRAZING CUPS: MSS-SP-73, ASME B 16.50 D. FIELD BENDS (ALL ANGLES): ASME B31.5 2.2 VALVES AND SPECIALTIES A. SERVICE VALVES: 1. BODY: FORGED BRASS WITH BRASS CAP INCLUDING KEY END TO REMOVE CORE. 2. CORE: REMOVABLE BALL-TYPE CHECK VALVE WITH STAINLESS-STEEL SPRING. 3. SEAT: POLYTETRAFLUOROETHYLENE. 4. END CONNECTIONS: SOCKET ENDS. 5. WORKING PRESSURE RATING: 700 PSIG. 6. MAXIMUM OPERATING TEMPERATURE 250 DEG. F 7. VALVES MUST BE SPECIFICALLY RATED FOR R-410A. 2.3 REFRIGERANTS A. AVAILABLE MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, MANUFACTURERS OFFERING PRODUCTS THAT MAY BE INCORPORATED INTO THE WORK INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: B. ASHRAE 34, R-410A: R-32/R-125 (50.0/50.0) PART 3 - EXECUTION 3.1 PIPING APPLICATIONS A. SUCTION (LOW PRESSURE GAS), HOT GAS (HIGH PRESSURE GAS) AND LIQUID LINES OD 5/8" AND SMALLER FOR CONVENTIONAL AIR-CONDITIONING, HEAT PUMP, AND HEAT RECOVERY APPLICATIONS: COPPER, TYPE ACR, O60 (SOFT ANNEALED)-TEMPER TUBING AND FIELD BENT FITTINGS WITH BRAZED JOINTS. B. SUCTION (LOW PRESSURE GAS), HOT GAS (HIGH PRESSURE GAS), AND LIQUID LINES OD 2-1/8" AND SMALLER FOR ED CONVENTIONAL AIR-CONDITIONING, HEAT PUMP, AND HEAT RECOVERY APPLICATIONS: STRAIGHT LENGTHS, COPPER, TYPE ACR TYPE L, H55 (LIGHT DRAWN)-TEMPER TUBING AND FIELD BENT FITTINGS WITH BRAZED JOINTS. 3.2 VALVE AND SPECIALTY APPLICATIONS A. INSTALL SERVICE VALVES AS SHOWN ON PLANS OR AS REQUIRED TO ISOLATE SYSTEM COMPONENTS. 3.3 PIPING INSTALLATION A. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS; INDICATED LOCATIONS AND ARRANGEMENTS WERE USED TO SIZE PIPE AND CALCULATE FRICTION LOSS, EXPANSION, PUMP SIZING, AND OTHER DESIGN CONSIDERATIONS. INSTALL PIPING AS INDICATED UNLESS DEVIATIONS TO LAYOUT ARE APPROVED ON SHOP DRAWINGS. B. INSTALL REFRIGERANT PIPING ACCORDING TO ASHRAE 15. C. INSTALL PIPING IN CONCEALED LOCATIONS UNLESS OTHERWISE INDICATED AND EXCEPT IN EQUIPMENT ROOMS AND SERVICE AREAS. D. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE PROHIBITED UNLESS SPECIFICALLY INDICATED OTHERWISE. E. INSTALL PIPING ABOVE ACCESSIBLE CEILINGS TO ALLOW SUFFICIENT SPACE FOR CEILING PANEL REMOVAL. F. INSTALL PIPING ADJACENT TO MACHINES TO ALLOW SERVICE AND MAINTENANCE. G. INSTALL PIPING FREE OF SAGS AND BENDS . H. FIELD BEND CHANGES IN DIRECTION. I. SELECT SYSTEM COMPONENTS WITH PRESSURE RATING EQUAL TO OR GREATER THAN MAXIMUM ALLOWABLE WORKING PRESSURE. J. INSTALL PIPING AS SHORT AND DIRECT AS POSSIBLE, WITH A MINIMUM NUMBER OF JOINTS, ELBOWS, AND FITTINGS. K. ARRANGE PIPING TO ALLOW INSPECTION AND SERVICE OF REFRIGERATION EQUIPMENT. INSTALL VALVES AND SPECIALTIES IN ACCESSIBLE LOCATIONS TO ALLOW FOR SERVICE AND INSPECTION. INSTALL ACCESS DOORS OR PANELS AS SPECIFIED IN DIVISION 08 SECTION "ACCESS DOORS AND FRAMES" IF VALVES OR EQUIPMENT REQUIRING MAINTENANCE IS CONCEALED BEHIND FINISHED SURFACES. L. INSTALL INSULATED REFRIGERANT PIPING IN WATER-TIGHT PROTECTIVE CONDUIT WHERE INSTALLED BELOWGROUND. M. PROVIDE JACKETED INSULATION IN LOCATIONS WHERE EXPOSED TO MECHANICAL INJURY. N. WHEN BRAZING, REMOVE SOLENOID-VALVE COILS AND SIGHT GLASSES; ALSO, REMOVE VALVE STEMS, SEATS, AND PACKING, AND ACCESSIBLE INTERNAL PARTS OF REFRIGERANT SPECIALTIES. DO NOT APPLY HEAT NEAR EXPANSION-VALVE BULB. O. INSTALL PIPING WITH ADEQUATE CLEARANCE BETWEEN PIPE AND ADJACENT WALLS AND HANGERS OR BETWEEN PIPES FOR INSULATION INSTALLATION. P. IDENTIFY REFRIGERANT PIPING AND VALVES ACCORDING TO DIVISION 23 SECTION "IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT." Q. INSTALL SLEEVES FOR PIPING PENETRATIONS OF WALLS, CEILINGS, AND FLOORS. COMPLY WITH REQUIREMENTS FOR SLEEVES SPECIFIED IN DIVISION 23 SECTION "SLEEVES AND SLEEVE SEALS FOR HVAC PIPING." R. INSTALL SLEEVE SEALS FOR PIPING PENETRATIONS OF CONCRETE WALLS AND SLABS. COMPLY WITH REQUIREMENTS FOR SLEEVE SEALS SPECIFIED IN DIVISION 23 SECTION "SLEEVES AND SLEEVE SEALS FOR HVAC PIPING." S. INSTALL ESCUTCHEONS FOR PIPING PENETRATIONS OF WALLS, CEILINGS, AND FLOORS. COMPLY WITH REQUIREMENTS FOR ESCUTCHEONS SPECIFIED IN DIVISION 23 SECTION "ESCUTCHEONS FOR HVAC PIPING." T. PROVIDE PROPER COMPENSATION FOR PIPE/TUBE EXPANSION AND CONTRACTION PER EQUIPMENT MANUFACTURERS RECOMMENDATIONS. 3.4 PIPE JOINT CONSTRUCTION A. BRAZED JOINTS: CONSTRUCT JOINTS ACCORDING TO AWS'S "BRAZING HANDBOOK," CHAPTER "PIPE AND TUBE." 1. USE TYPE BCUP-5 (15% AG, 80% CU, 5% P), COPPER-PHOSPHORUS ALLOY PRE-FORMED BRAZING RINGS FOR JOINING COPPER SWAGE FITTINGS AND COPPER SOCKET FITTINGS WITH COPPER PIPE. DO NOT USE FLUX. 2. USE TYPE BAG-5 (45% AG), CADMIUM-FREE SILVER ALLOY FOR JOINING COPPER WITH BRONZE OR STEEL. USE MANUFACTURERS RECOMMENDED FLUX. B. FIELD SWAGED BRAZING CUPS: FABRICATE BRAZING CUP ON ONE TUBING END FOR EACH COUPLING. ONLY O60 (SOFT ANNEALED) AND H55 (LIGHT DRAWN) MAY BE SWAGED. DO NOT SWAGE H58 (DRAWN GENERAL PURPOSE). USE SWAGING TOOL DESIGNED TO PROVIDE A MINIMUM OF 0.0015" BRAZING GAP AND A MAXIMUM OF 0.005" BRAZING GAP. BRAZING CUP DEPTH FOR EACH TUBE SIZE SHALL BE AS FOLLOWS. C. FIELD BENDS: FABRICATE FIELD BENDS WITH A CENTER-LINE BEND RADIUS GREATER THAN OR EQUAL TO 4 TIMES THE NOMINAL OD OF THE PIPE OR TUBE. TUBE SHALL BE BENT WITH A TUBING BENDER SIZED FOR ACR OD TUBE SIZES AND SHALL NOT CAUSE CRACKS OR WRINKLES IN THE TUBE OR PIPE. DO NOT USE A CONDUIT BENDER FOR BENDING ACR COPPER. THE DIFFERENCE BETWEEN MAXIMUM AND MINIMUM DIAMETERS FOR PIPE BENDS SHOULD NOT EXCEED 8% OF THE NOMINAL OUTSIDE DIAMETER OF THE PIPE. ONLY O60 SOFT ANNEALED-TEMPER AND H55 LIGHT DRAWN-TEMPER SHALL BE FIELD BENT. DO NOT FIELD BEND H58 DRAWN GENERAL PURPOSE-TEMPER COPPER TUBE. D. BRAZING AND JOINING PROCEDURE 1. TUBE ENDS SHALL BE CUT WITH A CLEAN SHARP TUBING CUTTER. 2. DEBURR THE I.D. OF THE CUT TUBE END WITH A CLEAN DEBURRING TOOL. 3. VISUALLY INSPECT THE INTERIOR OF EACH TUBE FOR OBSTRUCTIONS AND DEBRIS BEFORE ASSEMBLY. PROTECT THE JOINT FROM CONTAMINATION BEFORE BRAZING. 4. METHOD OF PRE-CLEANING: NON-SHEDDING ABRASIVE PADS (SCOTCH BRIGHT) TO REMOVE ALL OXIDES IN THE BRAZING AREA FOLLOWED BY WIPING WITH A CLEAN LINT-FREE WHITE CLOTH. DO NOT GROOVE THE SURFACES WHILE CLEANING. 5. PURGE ALL TUBING WITH OIL FREE NITROGEN WHILE BRAZING AND UNTIL COOL TO THE TOUCH. USE AN OXYGEN ANALYZER TO VERIFY THE ABSENCE OF OXYGEN PRIOR TO BRAZING. THE OXYGEN CONTENT SHALL BE LESS THAN 1% BEFORE START OF BRAZING. 6. USE A NEUTRAL TO SLIGHTLY REDUCING FLAME USING OXY/ACETYLENE OR OXY/PROPANE. 7. USE THE PROPER TORCH TIP BASED ON TUBE SIZE AS RECOMMENDED BY THE TORCH MANUFACTURER. USE OF TURBO-TORCH OR ROSEBUD IS PERMITTED. 8. POST BRAZING CLEANING: EXTERIOR OF ALL COMPLETED JOINTS SHALL BE WASHED WITH A WATER SOAKED RAG OR SPONGE, FOLLOWED BY BRUSHING WITH A STAINLESS-STEEL HAND WIRE BRUSH TO REMOVE ANY RESIDUE FOR INSPECTION. 3.5 HANGERS AND SUPPORTS A. HANGER, SUPPORT, AND ANCHOR PRODUCTS ARE SPECIFIED IN DIVISION 23 SECTION "HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT." B. INSTALL THE FOLLOWING PIPE ATTACHMENTS: 1. ADJUSTABLE STEEL CLEVIS HANGERS FOR INDIVIDUAL HORIZONTAL RUNS. 2. RIGID HIGH COMPRESSIVE STRENGTH FOAM INSULATING PIPE SUPPORT AT ALL SUPPORT POINTS. COMPLY WITH SECTION 230719 "DX PIPING SYSTEM INSULATION". 3. DO NOT ATTACH HANGERS DIRECTLY TO PIPE OR TUBE. C. INSTALL HANGERS FOR COPPER TUBING WITH THE FOLLOWING MAXIMUM SPACING AND MINIMUM ROD SIZES: 1. UP TO 3/4" OD: MAXIMUM SPAN, 60 INCHES; MINIMUM ROD SIZE, 3/8 INCH. 2. GREATER THAN 3/4" THRU 1" OD: MAXIMUM SPAN, 72 INCHES; MINIMUM ROD SIZE, 3/8 INCH 3. GREATER THAN 1" THRU 2-1/8" OD: MAXIMUM SPAN, 96 INCHES; MINIMUM ROD SIZE, 3/8 INCH. D. SUPPORT MULTI-FLOOR VERTICAL RUNS EVERY 10 FEET AND AT LEAST AT EACH FLOOR. 3.6 FIELD QUALITY CONTROL A. PERFORM TESTS AND INSPECTIONS AND PREPARE TEST REPORTS. B. TESTS AND INSPECTIONS: 1. COMPLY WITH ASME B31.5, CHAPTER VI. 2. TEST AS RECOMMENDED BY EQUIPMENT MANUFACTURERS INSTRUCTIONS. 3. TEST REFRIGERANT PIPING AND SPECIALTIES. ISOLATE COMPRESSOR, CONDENSER, EVAPORATOR, AND SAFETY DEVICES FROM TEST PRESSURE IF THEY ARE NOT RATED ABOVE THE TEST PRESSURE. a. FILL SYSTEM WITH 95/5 NITROGEN/HYDROGEN TO THE REQUIRED TEST PRESSURE. b. SYSTEM SHALL MAINTAIN TEST PRESSURE AT THE MANIFOLD GAGE THROUGHOUT DURATION OF TEST. c. TEST ALL JOINTS AND FITTINGS WITH HYDROGEN LEAK DETECTOR, AT TEST PRESSURE. d. REMAKE LEAKING JOINTS USING NEW MATERIALS, AND RETEST UNTIL SATISFACTORY RESULTS ARE ACHIEVED. 3.7 SYSTEM CHARGING A. CHARGE SYSTEM USING THE FOLLOWING PROCEDURES AND PER EQUIPMENT MANUFACTURERS INSTRUCTIONS. 1. EVACUATE (TRIPLE EVACUATION PROCEDURE) ENTIRE REFRIGERANT SYSTEM WITH A VACUUM PUMP TO OBTAIN A STEADY STATE VACUUM OF LESS THAN 500 MICROMETERS. IF VACUUM HOLDS FOR 12 HOURS, SYSTEM IS READY FOR CHARGING. DO NOT EVACUATE THE SYSTEM THROUGH A CHARGING MANIFOLD. USE ONLY SUCTION RATED HOSES AND CORE REMOVAL TOOLS. 2. BREAK VACUUM WITH REFRIGERANT GAS, ALLOWING PRESSURE TO BUILD UP TO 2 PSIG. 3. CHARGE SYSTEM AS RECOMMENDED BY EQUIPMENT MANUFACTURER. AS REQUIRED CLEARANCE BOTH SIDES CLEARANCE STRUT CHANNEL ALL THREAD (TYP) INSULATION SUPPORT SADDLES DOUBLE NUT INSTALL PIPE SUPPORT EVERY 5' OF PIPE LENGTH OR PER LOCAL CODE REQUIREMENTS REFTEKK "CCE" EPDM INSULATED ANNEALED COPPER MINIMUM THICKNESS PER DETAIL 7 (DUAL-LAYER IF 2-1/2" THICKNESS IS REQUIRED, OUTER LAYER TO BE REFTEKK "AC" or "AC-SSPT" EPDM INSULATION) REFTEKK "RD" SADDLE 1. PIPE INSULATION AND PIPE SUPPORTS MUST BE INSTALLED STRICTLY IN ACCORDANCE WITH INSULATION MANUFACTURES INSTALLATION INSTRUCTIONS. 2. ALL BUTT JOINTS, LONGITUDINAL SEAMS AND INSULATION TERMINATIONS MUST BE GLUED AND SEALED PER INSULATION MANUFACTURERS INSTRUCTIONS. 3. INSULATION MUST BE INSTALLED UNDER SLIGHT COMPRESSION. DO NOT STRETCH INSULATION. 4. PROVIDE VAPOR DAM (2" LENGTH OF INSULATION GLUED TO PIPE) AT ALL INSULATION TERMINATIONS (EQUIPMENT CONNECTIONS, VALVES, REFRIGERATION SPECIALTIES). 5. HANGER SPACING MUST COMPLY WITH LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 6. ALL THREAD ROD SIZE AND STRUCTURAL CONNECTION MUST COMPLY WITH LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 7. PROVIDE SEISMIC SUPPORT AND BRACING AS REQUIRED BY LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 8. EPDM INSULATION MUST BE SEALED VAPOR TIGHT ALONG THE ENTIRE LENGTH OF THE PIPE AND MUST PASS CONTINOUSLY THROUGH PIPE SUPPORTS, AND BUILDING, STRUCTURAL AND FIRE RATED PENETRATIONS. 9. THE INSULATION MUST KEEP THE PIPE DRY AT ALL TIMES AND PROTECT AGAINST WATER INTRUSION FROM RAIN AND CONDENSATION. 10. PIPING SUPPORTED ON INSULATION SADDLES FOR INDOOR USE ONLY. DO NOT USE SADDLE SUPPORTS OUTDOORS. DETAIL 6 ANNEALED COPPER COIL (LINE SETS) SUPPORT (IN EXAMPLE SHOWN, HIGH PRESSURE GAS ≤ 200° F) REFTEKK MODEL "UX" RIGID INSULATION SUPPORT (THICKNESS TO MATCH INSULATION) (DUAL-LAYER IF 2-1/2") SUPPORT STRUT REFTEKK "HHC" COPPER TUBE (H55 TYPE L ACR BENDABLE QUALITY) ALL THREAD (TYP) 1. PIPE INSULATION AND PIPE SUPPORTS MUST BE INSTALLED STRICTLY IN ACCORDANCE WITH INSULATION MANUFACTURES INSTALLATION INSTRUCTIONS. 2. ALL BUTT JOINTS, LONGITUDINAL SEAMS AND INSULATION TERMINATIONS MUST BE GLUED AND SEALED PER INSULATION MANUFACTURERS INSTRUCTIONS. 3. INSULATION MUST BE INSTALLED UNDER SLIGHT COMPRESSION. DO NOT STRETCH INSULATION. 4. PROVIDE VAPOR DAM (2" LENGTH OF INSULATION GLUED TO PIPE) EVERY 12' TO 18', AND AT ALL INSULATION TERMINATIONS (EQUIPMENT CONNECTIONS, VALVES, REFRIGERATION SPECIALTIES). 5. EPDM INSULATION MUST BE SEALED VAPOR TIGHT ALONG THE ENTIRE LENGTH OF THE PIPE AND MUST PASS CONTINOUSLY THROUGH PIPE SUPPORTS AND BUILDING STRUCTURAL AND FIRE RATED PENETRATIONS. 6. DO NOT ATTACH ANYTHING TO THE INSULATION (I.E. CONTROL WIRING, DATA CABLING, ETC.) 7. DO NOT SECURE INSULATION OR ATTACH ANYTHING TO THE INSULATION WITH TIE WRAPS. 8. DO NOT ALLOW CEILING SUPPORT HANGER WIRES TO TOUCH THE INSULATION. 9. DO NOT ALLOW THE INSULATION TO BE COMPRESSED BY STRUCTURAL MEMBERS OR PENETRATIONS THROUGH WALL, CEILINGS, OR FLOORS. 10. PIPING AND INSULATION MUST BE CLEAN AND DRY PRIOR TO APPLICATION OF INSULATION. 11. ONLY APPLY INSULATION TO PIPES THAT ARE AT AMBIENT TEMPERATURE. DO NOT APPLY INSULATION TO PIPES THAT ARE IN OPERATION. 12. THE INSULATION MUST KEEP THE PIPE DRY AT ALL TIMES AND PROTECT AGAINST WATER INTRUSION FROM RAIN AND CONDENSATION. 13. HANGER SPACING MUST COMPLY WITH LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 14. ALL-THREAD ROD SIZE AND STRUCTURAL CONNECTION MUST COMPLY WITH LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 15. PROVIDE ADDITIONAL SEISMIC SUPPORT AND BRACING AS REQUIRED BY LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 16. PROVIDE 1" MINIMUM SPACE BETWEEN INSULATED PIPES FOR AIR CIRCULATION 17. PROVIDE 1" MINIMUM CLEARANCE BETWEEN INSULATION AND ALL-THREAD. DETAIL 2 COPPER STRAIGHT LENGTH - EPDM INSTALLATION (IN EXAMPLE SHOWN, HIGH PRESSURE GAS > 200° F) REFTEKK "UX" RIGID INSULATION SUPPORT (THICKNESS TO MATCH INSULATION) (DUAL-LAYER IF 2-1/2" THICKNESS IS REQUIRED) REFTEKK "HHC" COPPER TUBE (H55 TYPE L ACR BENDABLE QUALITY) REFTEKK "AC" OR "AC-SSPT" EPDM INSULATION, MINIMUM THICKNESS PER DETAIL 7 (DUAL-LAYER IF 2-1/2" THICKNESS IS REQUIRED) ALL THREAD (TYP) DETAIL 5 COPPER STRAIGHT LENGTH - EPDM INSTALLATION (IN EXAMPLE SHOWN, HIGH PRESSURE GAS ≤ 200° F) LIQUID LP GAS HP GAS PIPE HANGER SPACING TUBE SIZE (in)SPACING (ft) 1/4"5 3/8"5 1/2"5 5/8"5 3/4"6 7/8"6 1-1/8"7 1-3/8"8 1-5/8"8 2-1/8"8 DETAIL 7 INSULATION THICKNESS AND HANGER SPACING TABLES (APPLIES TO ALL REFRIGERANT PIPING SYSTEMS) 1. PIPE INSULATION AND PIPE SUPPORTS MUST BE INSTALLED STRICTLY IN ACCORDANCE WITH INSULATION MANUFACTURES INSTALLATION INSTRUCTIONS. 2. ALL BUTT JOINTS, LONGITUDINAL SEAMS AND INSULATION TERMINATIONS MUST BE GLUED AND SEALED PER INSULATION MANUFACTURERS INSTRUCTIONS. 3. INSULATION MUST BE INSTALLED UNDER SLIGHT COMPRESSION. DO NOT STRETCH INSULATION. 4. PROVIDE VAPOR DAM (2" LENGTH OF INSULATION GLUED TO PIPE) AT ALL INSULATION TERMINATIONS (EQUIPMENT CONNECTIONS, VALVES, REFRIGERATION SPECIALTIES). 5. HANGER SPACING MUST COMPLY WITH LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 6. ALL THREAD ROD SIZE AND STRUCTURAL CONNECTION MUST COMPLY WITH LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 7. PROVIDE SEISMIC SUPPORT AND BRACING AS REQUIRED BY LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 8. EPDM INSULATION MUST BE SEALED VAPOR TIGHT ALONG THE ENTIRE LENGTH OF THE PIPE AND MUST PASS CONTINOUSLY THROUGH PIPE SUPPORTS, AND BUILDING, STRUCTURAL AND FIRE RATED PENETRATIONS. 9. THE INSULATION MUST KEEP THE PIPE DRY AT ALL TIMES AND PROTECT AGAINST WATER INTRUSION FROM RAIN AND CONDENSATION. 10. PIPING SUPPORTED ON INSULATION SADDLES FOR INDOOR USE ONLY. DO NOT USE SADDLE SUPPORTS OUTDOORS. DETAIL 3 ANNEALED COPPER COIL (LINE SETS) SUPPORT (IN EXAMPLE SHOWN, HIGH PRESSURE GAS > 200° F) CLEARANCE AS REQUIRED CLEARANCE BOTH SIDES ALL THREAD (TYP) STRUT CHANNEL INSTALL PIPE SUPPORT EVERY 5' OF PIPE LENGTH OR PER LOCAL CODE REQUIREMENTS DOUBLE NUT INSULATION SUPPORT SADDLES REFTEKK "RD" SADDLE REFTEKK "CCE" EPDM INSULATED ANNEALED COPPER MINIMUM THICKNESS PER DETAIL 7 (DUAL-LAYER IF 2-1/2" THICKNESS IS REQUIRED, OUTER LAYER TO BE REFTEKK "AC" or "AC-SSPT" EPDM INSULATION) NOTES 1. THE ABOVE TABLE INDICATES MINIMUM PIPE INSULATION THICKNESSES BASED ONLY ON ENERGY CODE REQUIREMENTS. ACTUAL THICKNESSES TO BE THE GREATER OF 1) ENERGY CODE REQUIREMENTS, 2) LOCAL JURISDICTION REQUIREMENTS, 3) MANUFACTURER INSTALLATION REQUIREMENTS, and 4) LOCATION DEPENDENT HUMIDITY CALCULATIONS FOR CONDENSATION CONTROL. 2. VERIFY MIN/MAX REFRIGERANT FLUID OPERATING TEMPERATURE RANGES WITH EQUIPMENT MANUFACTURER. 3. THE ABOVE TABLE APPLIES TO ALL REFRIGERATION PIPING SYSTEMS, INCLUDING COOLING ONLY with/without HOT GAS BYPASS. HEAT PUMP SYSTEMS INCLUDING MINI-SPLITS, AND VRF/VRV HEAT PUMP AND HEAT RECOVERY SYSTEMS. 4. VRF/VRV 3-PIPE HEAT RECOVERY SYSTEMS TYPICALLY HAVE HIGH PRESSURE VAPOR PIPING (FOR HEATING) THAT EXCEEDS 200° F. 5. VRF 2 PIPE HEAT RECOVERY SYSTEMS TYPICALLY HAVE HIGH PRESSURE VAPOR/LIQUID 2 PHASE (FOR HEATING) THAT IS LESS THAN 200° F. 6. FOR VRF/VRV HEAT RECOVERY SYSTEMS, THE ABOVE TABLE APPLIES TO PIPING BETWEEN THE OUTDOOR UNIT AND MODE SELECTION BOX AND BETWEEN THE MODE SELECTION BOX AND INDOOR UNITS (FAN COILS). 7. ALL INSULATION WALL THICKNESS GREATER THAN 1-1/2" REQUIRES DOUBLE LAYER (1" base layer plus 1-1/2" outer layer) TO MEET ASTM E84 (UL 723). EACH INDIVIDUAL LAYER MUST BE FULLY VAPOR PROOF SEALED AND MEET ASTM E84 25/50 FLAME SPREAD/SMOKE GENERATED RATINGS. DETAIL 4 BRANCH CONTROLLER PIPING with SERVICE VALVES ***ONLY APPLICABLE TO HEAT RECOVERY SYSTEMS*** 1. PIPE INSULATION AND PIPE SUPPORTS MUST BE INSTALLED STRICTLY IN ACCORDANCE WITH INSULATION MANUFACTURES INSTALLATION INSTRUCTIONS. 2. ALL BUTT JOINTS, LONGITUDINAL SEAMS AND INSULATION TERMINATIONS MUST BE GLUED AND SEALED PER INSULATION MANUFACTURERS INSTRUCTIONS. 3. INSULATION MUST BE INSTALLED UNDER SLIGHT COMPRESSION. DO NOT STRETCH INSULATION. 4. PROVIDE VAPOR DAM (2" LENGTH OF INSULATION GLUED TO PIPE) EVERY 12' TO 18', AND AT ALL INSULATION TERMINATIONS (EQUIPMENT CONNECTIONS, VALVES, REFRIGERATION SPECIALTIES). 5. EPDM INSULATION MUST BE SEALED VAPOR TIGHT ALONG THE ENTIRE LENGTH OF THE PIPE AND MUST PASS CONTINOUSLY THROUGH PIPE SUPPORTS AND BUILDING STRUCTURAL AND FIRE RATED PENETRATIONS. 6. DO NOT ATTACH ANYTHING TO THE INSULATION (I.E. CONTROL WIRING, DATA CABLING, ETC.) 7. DO NOT SECURE INSULATION OR ATTACH ANYTHING TO THE INSULATION WITH TIE WRAPS. 8. DO NOT ALLOW CEILING SUPPORT HANGER WIRES TO TOUCH THE INSULATION. 9. DO NOT ALLOW THE INSULATION TO BE COMPRESSED BY STRUCTURAL MEMBERS OR PENETRATIONS THROUGH WALL, CEILINGS, OR FLOORS. 10. PIPING AND INSULATION MUST BE CLEAN AND DRY PRIOR TO APPLICATION OF INSULATION. 11. ONLY APPLY INSULATION TO PIPES THAT ARE AT AMBIENT TEMPERATURE. DO NOT APPLY INSULATION TO PIPES THAT ARE IN OPERATION. 12. THE INSULATION MUST KEEP THE PIPE DRY AT ALL TIMES AND PROTECT AGAINST WATER INTRUSION FROM RAIN AND CONDENSATION. 13. HANGER SPACING MUST COMPLY WITH LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 14. ALL-THREAD ROD SIZE AND STRUCTURAL CONNECTION MUST COMPLY WITH LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 15. PROVIDE ADDITIONAL SEISMIC SUPPORT AND BRACING AS REQUIRED BY LOCAL CODE OR AUTHORITY HAVING JURISDICTION. 16. PROVIDE 1" MINIMUM SPACE BETWEEN INSULATED PIPES FOR AIR CIRCULATION 17. PROVIDE 1" MINIMUM CLEARANCE BETWEEN INSULATION AND ALL-THREAD. PIPING TO AND FROM OUTDOOR UNIT(S) TO BE H55 STRAIGHT LENGTH COPPER. SCHRADER PORTS TO BE INSTALLED TOWARDS BC CONTROLLER. MAIN BRANCH CIRCUIT (BC) CONTROLLER PIPING TO AND FROM SUB BRANCH CIRCUIT (BC) CONTROLLER(S) TO BE H55 STRAIGHT LENGTH COPPER. 1. ALL BRANCH CONTROLLER PIPING PORTS (INLET AND OUTLET) SHALL BE FITTED WITH A REFRIGERANT SERVICE VALVE WITH INTEGRAL SCHRADER PORT. 2. ALL REFRIGERANT SERVICE VALVES SHALL BE RATED FOR R-410A. 3. ANY UNUSED PORTS TO HAVE VALVE INSTALLED WITH 6" LENGTH OF PIPING WITH BRAZED CAP. 6. VALVE SHALL BE IN THE CLOSED POSITION ON ANY UNUSED PORTS. 7. ALL PIPING AND VALVES SHOULD BE SUPPORTED WITHIN 12" OF THE BC CONTROLLER. 8. ALL VALVES SHALL BE FURNISHED AND INSTALLED WITH FACTORY SUPPLIED EPDM INSULATION JACKET. 9. FACTORY JACKETS AND PIPING INSULATION MUST BE SEALED VAPOR TIGHT AT ALL LONGITUDINAL AND BUTT JOINTS. 10. PIPING INSULATION AND VALVE JACKETS MUST BE SEALED VAPOR TIGHT TO THE BC CONTOLLER TO PREVENT CONDENSATION. 11. ALL PIPING INSULATION AND VALVE JACKETS MUST KEEP THE PIPING DRY. DETAIL SHOWS 8 PORT MAIN BC CONTROLLER AND 8 PORT SUB BC CONTROLLER. ALL OTHER BC CONTROLLER SIZES SIMILAR. INSULATION AND VALVE JACKETS NOT SHOWN FOR CLARITY. PIPING TO AND FROM INDOOR (FAN COIL) UNITS TO BE O60 ANNEALED COILS OR H55 STRAIGHT LENGTH COPPER. SCHRADER PORTS TO BE INSTALLED FACING AWAY FROM BC CONTROLLER. DETAIL 1 BRANCH SELECTOR PIPING with SERVICE VALVES PIPING TO AND FROM OUTDOOR UNIT(S) TO BE H55 STRAIGHT LENGTH COPPER. SCHRADER PORTS TO BE INSTALLED TOWARDS BRANCH SELECTOR. PIPING TO AND FROM INDOOR (FAN COIL) UNITS TO BE O60 ANNEALED COILS OR H55 STRAIGHT LENGTH COPPER. SCHRADER PORTS TO BE INSTALLED FACING AWAY FROM BC CONTROLLER 1. ALL BRANCH SELECTOR PIPING PORTS (INLET AND OUTLET) SHALL BE FITTED WITH A REFRIGERANT SERVICE VALVE WITH INTEGRAL SCHRADER PORT. 2. ALL REFRIGERANT SERVICE VALVES SHALL BE RATED FOR R-410A. 3. ANY UNUSED PORTS TO HAVE VALVE INSTALLED WITH 6" LENGTH OF PIPING WITH BRAZED CAP. 6. VALVE SHALL BE IN THE CLOSED POSITION ON ANY UNUSED PORTS. 7. ALL PIPING AND VALVES SHOULD BE SUPPORTED WITHIN 12" OF THE BRANCH SELECTOR. 8. ALL VALVES SHALL BE FURNISHED AND INSTALLED WITH FACTORY SUPPLIED EPDM INSULATION JACKET. 9. FACTORY JACKETS AND PIPING INSULATION MUST BE SEALED VAPOR TIGHT AT ALL LONGITUDINAL AND BUTT JOINTS. 10. PIPING INSULATION AND VALVE JACKETS MUST BE SEALED VAPOR TIGHT TO THE BRANCH SELECTOR TO PREVENT CONDENSATION. 11. ALL PIPING INSULATION AND VALVE JACKETS MUST KEEP THE PIPING DRY. DETAIL SHOWS 4 PORT BRANCH SELECTOR. ALL OTHER BRANCH SELECTOR SIZES SIMILAR. INSULATION AND VALVE JACKETS NOT SHOWN FOR CLARITY. PIPE RRF (DETAILS ABOE LINE) (DETAILS BELO LINE) PIPE RF SUPPORT STRUT PIPE RRF (DETAILS ABOE LINE) (DETAILS BELO LINE) PIPE RF REFTEKK "AC" OR "AC-SSPT" EPDM INSULATION, MINIMUM THICKNESS PER DETAIL 7 (DUAL-LAYER IF 2-1/2" THICKNESS IS REQUIRED) REFTEKK "JBV" SERVICE VALVE WITH FACTORY PROVIDED EPDM INSULATION JACKET (NOT SHOWN) REFTEKK "JBV" SERVICE VALVE WITH FACTORY PROVIDED EPDM INSULATION JACKET (NOT SHOWN) REV 05204030 M-006 TI T L E - 2 4 R E Q U I R E M E N T S FO R V R F P I P E I N S U L A T I O N SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m M-200 SI T E P L A N SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N T A E N E S A N T A A N A C A 9 2 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 1/8"=1'-0" FIRST FLOOR PLAN M-301 FI R S T F L O O R P L A N SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 3/16"=1'-0" FIRST FLOOR PLAN NOTES 1. ALL SUPPLY DIFFUSERS, RETURN GRILLES AND EXHAUST REGISTERS ARE STEEL CONSTRUCTION WITH WHITE FINISH UNLESS OTHERWISE NOTED ON PLANS. 2. WRAP ALL SUPPLY AND RETURN DUCTS INSIDE SOFFIT WITH R-6 INSULATION. FOR AREAS WHERE SPACE DOES NOT ALLOW REGULAR INSULATION YOU MAY USE BUBBLE WRAP. 1 BID ADDENDUM 01 JUNE 12 2025 REV 08 1 1 1 1 1 1 1 M-302 SE C O N D F L O O R P L A N SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 3/16"=1'-0" SECOND FLOOR PLAN NOTES 1. ALL SUPPLY DIFFUSERS, RETURN GRILLES AND EXHAUST REGISTERS ARE STEEL CONSTRUCTION WITH WHITE FINISH UNLESS OTHERWISE NOTED ON PLANS. 2. WRAP ALL SUPPLY AND RETURN DUCTS INSIDE SOFFIT WITH R-6 INSULATION. FOR AREAS WHERE SPACE DOES NOT ALLOW REGULAR INSULATION YOU MAY USE BUBBLE WRAP. 1 M-303 RO O F P L A N SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 3/16"=1'-0" ROOF PLAN 11 1 M-304 FI R S T F L O O R RE F R I G E R A T I O N P I P I N G SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 3/16"=1'-0" FIRST FLOOR PLAN - REFRIGERATION PIPING REFRIGERANT PIPING SHOWN HERE FOR ROUTING ONLY. SEE REFRIGERANT PIPING DIAGTRAM ON SHEET M-400 FOR SIZING AND NUMBER OF PIPING. M-305 SE C O N D F L O O R RE F R I G E R A T I O N P I P I N G SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 3/16"=1'-0" SECOND FLOOR PLAN - REFRIGERATION PIPING REFRIGERANT PIPING SHOWN HERE FOR ROUTING ONLY. SEE REFRIGERANT PIPING DIAGTRAM ON SHEET M-400 FOR SIZING AND NUMBER OF PIPING. 5/8''|1 1/8''|1 1/8''(in) 20.00ft|5EA MCU MCU-S4NEK3UN MCU-1 3/8''|7/8''(in) 10.00ft|4EA AM096FNHDCH/AA | FC-1 92644Btu/h | 74926Btu/h110869Btu/h 0 # 3/8''|7/8''(in) 40.00ft|4EA AM096FNHDCH/AA | FC-2 92644Btu/h | 74926Btu/h 110869Btu/h 0 # IDU Pipe Mat AR18CSFCMWKNCV | FC-12 17740Btu/h | 14191Btu/h | 18437Btu/h 0 # CAC-1 AR18CSFCMWKXCV 18437Btu/h | 17740Btu/h 1/4''|1/2''(in) 85.00ft|4EA 1 1 2 2 3 3 4 4 5 5 6 6 240.00 R 0.00 1F 120.00 2F MCU MCU-S12NEK1UN MCU11 3/8''|5/8''(in) 35.00ft|4EA AM030TNZDCH/AA | FC-3 28371Btu/h | 21243Btu/h | 34029Btu/h 0 # 3/8''|5/8''(in) 20.00ft|4EA AM030TNZDCH/AA | FC-4 28371Btu/h | 21243Btu/h | 34029Btu/h 0 # 3/8''|5/8''(in) 50.00ft|4EA AM036TNZDCH/AA | FC-5 34097Btu/h | 25379Btu/h | 40133Btu/h 0 # 5/8''|1 3/8''|1 1/8''(in) 80.00ft|10EA 1/4''|1/2''(in) 100.00ft|8EA AM018TNZDCH/AA | FC-6 17074Btu/h | 12537Btu/h | 22061Btu/h 0 # 3/8''|5/8''(in) 90.00ft|8EA AM024TNZDCH/AA | FC-7 22748Btu/h | 16944Btu/h | 27048Btu/h 0 # AM030TNZDCH/AA | FC-8 28371Btu/h | 21243Btu/h | 34029Btu/h 0 # 3/8''|5/8''(in) 65.00ft|8EA AM048TNZDCH/AA | FC-9 45420Btu/h | 32777Btu/h | 54135Btu/h 0 # AM036TNZDCH/AA | FC-10 34097Btu/h | 25379Btu/h | 40133Btu/h 0 # 3/8''|5/8''(in) 60.00ft|8EA AM018TNZDCH/AA | FC-11 17074Btu/h | 12537Btu/h | 22061Btu/h 0 # 1/4''|1/2''(in) 65.00ft|8EA 3/8''|5/8''(in) 95.00ft|8EA IDU Pipe Mat IDU Pipe Mat IDU Pipe Mat IDU Pipe Mat SHP-2 AM240BXVGJR/AA 307656Btu/h | 255624Btu/h SHP-1 AM192BXVGJR/AA 221737Btu/h | 185287Btu/h M-400 PI P I N G D I A G R A M SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SHP-1 SHP-2 CAC-1 Circuit Breaker 281 | 2 | 208-230 | 60 11.8A Circuit Breaker 270A 0.00 1F Circuit Breaker 22 Power meter 22 Power meter 27 F1/F2 Power meter 28 F1/F2 MCU-1 MCU-S4NEK3UN Circuit Breaker 27 FC-1 AM096FNHDCH/AA R02 MWR-WG00UN F3/F4 FC-2 AM096FNHDCH/AA R03 MWR-WG00UN F3/F4 Circuit Breaker 401 | 2 | 208-230 | 60 12.57A 120.00 2F 0.00 1F Circuit Breaker 39 Power meter 39 Power meter 40 F1/F2 F1/F2 F1/F2 F1/F2 F1/F2 F1/F2 F1/F2 F1/F2 F1/F2 F1/F2F1/F2 F1/F2 F1/F2 FC-6 AM018TNZDCH/AA R13 MWR-WG00UN F3/F4 FC-7 AM024TNZDCH/AA R08 MWR-WG00UN F3/F4 FC-8 AM030TNZDCH/AA R14 MWR-WG00UN F3/F4 FC-9 AM048TNZDCH/AA R09 MWR-WG00UN F3/F4 FC-10 AM036TNZDCH/AA R10 MWR-WG00UN F3/F4 FC-11 AM018TNZDCH/AA R11 MWR-WG00UN F3/F4 MCU11 MCU-S12NEK1UN Circuit Breaker 40 FC-3 AM030TNZDCH/AA R04 MWR-WG00UN F3/F4 FC-4 AM030TNZDCH/AA R01 MWR-WG00UN F3/F4 FC-5 AM036TNZDCH/AA R05 MWR-WG00UN F3/F4 CAC-1 AR18CSFCMWKXCV 120.00 2F Circuit Breaker1 | 2 | 208-230 | 60 MCA, 16A MOP, 25A 38 Power meter 38 F1/F2 F1/F2 FC-12 AR18CSFCMWKNCV R12 MWR-WG00UN F3/F4 MIM-A00UN SHP-1 AM192BXVGJR/AA 3 | 3 | 460 | 60 MCA, 34A MOP, 40A SHP-2 AM240BXVGJR/AA 3 | 3 | 460 | 60 MCA, 40A MOP, 50A M-401 WI R I N G D I A G R A M SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m M-500 DE T A I L S SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m VIBRATION ISOLATOR TYP. 4 PLACES M-600 TI T L E - 2 4 BU I L D I N G - A SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m 1 M-601 TI T L E - 2 4 BU I L D I N G - A SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m 1 M-602 TI T L E - 2 4 BU I L D I N G - B SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m 1 M-603 TI T L E - 2 4 BU I L D I N G - B SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m 1 M-604 TI T L E - 2 4 BU I L D I N G - B SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 6.12.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m 1 P-001 NO T E S , L E G E N D SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m P-002 SC H E D U L E S SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m P-3.00 PH A S E 1 S I T E P L A N SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 1/16"=1'-0" PHASE 1 SITE PLAN AS SHOWN P-3.01 FI R S T F L O O R P L A N SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 3/16"=1'-0" FIRST FLOOR PLAN OD RD OD RD OD RD OD RD P-3.03 SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 3/16"=1'-0" ROOF PLAN RO O F P L A N OD RD RD OD P-3.02 SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m SCALE: 3/16"=1'-0" SECOND FLOOR PLAN SE C O N D F L O O R P L A N WHA TP EXPANSION TANK RECIRC. PUMP MAIN SHUT-OFF VALVE TP SHUT-OFF VALVE SHUT-OFF VALVE SHUT-OFF VALVE P-4.01 HO T & C O L D W A T E R R I S E R DI A G R A M SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m HOT & COLD WATER RISER DIAGRAM NOT TO SCALE MAIN BUILDING MULTI-PURPOSE BUILDING P-4.02 WA S T E & V E N T R I S E R D I A G R A M SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m WASTE & VENT RISER DIAGRAM NOT TO SCALE MAIN BUILDING MULTI-PURPOSE BUILDING P-500 DE T A I L S SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m P-600 TI T L E - 2 4 - B L D G A SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m P-601 TI T L E - 2 4 - B L D G B SA N T A A N A Z O O E D U C A T I O N H U B 18 2 1 E C H E S T N U T A V E N U E S A N T A A N A , C A 9 2 7 0 1 CFOE OFILA 9-30-25 TATS ACINAHCEMExp. No. ARHAHS EFORPDERETSI E G R AINR REENIGNEL M24912 NAZRAFM ER E NIGNELANOISS DATE: 5.29.2025 SCALE: SEE PLANS ISSUE DATE REVISION DATE SF E n g i n e e r i n g 11 0 4 1 S a n t a M o n i c a B l v d . , S u i t e 5 0 9 LO S A N G E L E S , C A 9 0 0 2 5 Te l . ( 3 1 0 ) 3 8 6 2 4 0 0 sp f a r z a n @ y a h o o . c o m S�htA AN4 c n1 _ 1�L•N iJ Vi sCH00, (First, Ml, La r ��A k l 1 Project Certificate of Compliance Payment of School Facility Fees Santa Ana Unified School District State Zip Code C` �� �\�c \ `A Name (First, Ml, Last) Use of Building (check) Residential ❑ Commercial Senior Housing ❑ Description of Project Number of Square Feet of Residential Space CITY OF SANTA ANA Planning and Building Agency 5144 Approved FOR PFRMIT ISSUANCE Telephone Master ID: ��--1- (_� Coati.- ,_4 � . Tmct/Parcel Numbi Telephone Type of Project (check) VONNNYU, r� Sq.Ft x $ (Dev. Fee) NeiZ9 Addition ❑ Alteration ❑ Total $ Number of Square Fee (� L Commercial Space , �'11 O— Sq.Ft x $ I � Total ` t (Dev. Fee) The above representations as to square footage are true. Applicant agrees that if it is later determined that such representations are not true, then this certificate shall automatically terminate, and the appropriate City/County shall be notified. Applicant is hereby noticed that any party filing a protest regarding the imposition of fees pursuant to Government Code Section 53080 must do so within 90 days from the payment of the fee. Applicant Name (Pleisi Pri ) Signature 1,tl�t� Date This certifies that the above -named Applicant has paid school facility fees in compliance with all existing and applicable sections of the Gov ment Code and Education Code. Santa Xna Unified School District Authorized Representative Date DISTMI J710N White - CirylCounty Conan• -Applicant Pink - Facilities YES NO INSTRUCTIONS: ORAN GE COUNTY FI RE AUTHORI TY Plan Submittal Criteria COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects and RESIDENTIAL TRACT developments · Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place. · Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section. · If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA. · In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations. · Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602. Address Suite City Project Scope/Business Description 1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways, curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within 300 feet of an active or proposed oil well? Fire Master Plan (PR145) 2. Property is adjacent to a wildland area or non-irrigated native vegetation? Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124) 3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170) 4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475) 5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000 sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285) 6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card, button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520) 7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment; industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations? Special Equipment Plan (PR315, PR340-PR382) 8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240) 9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330) 10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335) Initial each of the following two items indicating that you have read and understand the statement: 11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications. 12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327— Initials the building department will determine specific requirements. I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name Signature Phone Number ( ) Date / / Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the appropriate plans and fees for OCFA review. 10-08-14 EE COM O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City Official Requesting Review: City Reference #: __________________________ City / County: _____________________________________ Date: __________________________________ Contact Name: _____________________________________ E-Mail: __________________________________ Title: _____________________________________ Phone #: _________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County: OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ Updated: 08/30/2021 YES NO INSTRUCTIONS: ORAN GE COUNTY FI RE AUTHORI TY Plan Submittal Criteria COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects and RESIDENTIAL TRACT developments · Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place. · Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section. · If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA. · In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations. · Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602. Address Suite City Project Scope/Business Description 1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways, curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within 300 feet of an active or proposed oil well? Fire Master Plan (PR145) 2. Property is adjacent to a wildland area or non-irrigated native vegetation? Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124) 3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170) 4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475) 5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000 sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285) 6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card, button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520) 7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment; industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations? Special Equipment Plan (PR315, PR340-PR382) 8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240) 9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330) 10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335) Initial each of the following two items indicating that you have read and understand the statement: 11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications. 12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327— Initials the building department will determine specific requirements. I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name Signature Phone Number ( ) Date / / Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the appropriate plans and fees for OCFA review. 10-08-14 EE COM O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City Official Requesting Review: City Reference #: __________________________ City / County: _____________________________________ Date: __________________________________ Contact Name: _____________________________________ E-Mail: __________________________________ Title: _____________________________________ Phone #: _________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County: OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ Updated: 08/30/2021 2860 Walnut Avenue, Signal Hill CA 90755 * Tel: (562) 426 -7990 * Fax: (562) 426 -1842 REPORT OF GEOTECHNICAL INVESTIGATION Proposed Community Hub Building at Santa Ana Zoo 1801 East Chestnut Avenue City of Santa Ana, California Prepared For: LOC Architects 3203 East 4th Street Los Angeles, California 90063 Project No. 7160.23 January 23, 2024 2860 Walnut Avenue, Signal Hill CA 90755 * Tel: (562) 426 -7990 * Fax: (562) 426 -1842 January 22, 2024 Project No. 7160.23 LOC Architects 3203 East 4th Street Los Angeles, California 90063 Attention: Poonam Sharma Subject: REPORT OF GEOTECHNICAL INVESTIGATION AND FIELD INFILTRATION TESTING Proposed Community Hub Building at Santa Ana Zoo 1801 East Chestnut Avenue, Santa Ana, California Ladies and Gentlemen: Presented herewith is the Report of Geotechnical Investigation (the Soils Report) prepared by Associated Soils Engineering, Inc. (ASE) for the proposed community hub building (the Building) in the Santa Ana Zoo, located at 1801 East Chestnut Avenue in the City of Santa Ana, California. This work was conducted in accordance with ASE's Proposal No. P23-041, dated March 17, 2024, which subsequently received your authorization. The subject geotechnical investigation was planned and performed based on the relevant project information provided by your office, which included request for proposal, prepared by City of Santa Ana, detailing the project scope of work. Also provided were plans entitled “Topographic Survey”, prepared by kpff, dated September 29, 2023 and “Implementation Plan Summary” (3 sheets) prepared by CLR Design, dated February 2018. The plans show the existing site layout and proposed future zoo developments, respectively. The purpose of this study was to evaluate the subsurface soils conditions at the Sites, followed by assessment of site geologic/seismic hazards, performance of engineering analyses, and formulation/assembly of recommendations for the geotechnical design and construction pertinent to the Building. ASE's study has concluded that construction of the Building is geotechnically feasible provided that the recommendations and criteria with respect to ground preparation and foundation construction presented in the Soils Report are incorporated in the project plans and design and implemented during construction. This Soils Report also presents 1) the findings of the geotechnical field investigation, 2) the summary of potential geological/seismic hazard assessment, 3) the results of laboratory tests performed, and 4) the measured results from on-site percolation testing and the calculated infiltration rates. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426-7990 * Fax: (562) 426-1842 -2 - We at ASE appreciate the opportunity to provide our professional services on this important project and look forward to assisting you during construction phase of the Building. If you have any questions or require additional information, please contact the undersigned. Respectfully submitted, ASSOCIATED SOILS ENGINEERING, INC. Torin Ng, EIT Lawrence J.D. Chang, P.E, G.E. Project Engineer Geotechnical Engineer, RGE 2881 Edward C. (Ted) Riddell, P.G. Engineering Geologist, CEG 1775 TN/LC/ECR:tn Distribution: (3) hard copies + (1) PDF copy- Addressee i TABLE OF CONTENTS Section Page 1.0 INTRODUCTION .......................................................................................................................... 1 1.1 Project Outline ..................................................................................................................... 1 1.1.1 Building/Development Scope ............................................................................................ 1 1.1.2 Structural Loading for Geotechnical Analyses ................................................................. 1 1.2 Scope of Exploration ............................................................................................................. 1 2.0 SITE AND SUBSURFACE CONDITIONS .............................................................................................. 3 2.1 Location and Surface Conditions ........................................................................................... 3 2.2 Subsurface Conditions .......................................................................................................... 3 2.2.1 Artificial Fill (af) .................................................................................................................. 3 2.2.2 Younger Fan Deposits (Qyfa) ............................................................................................. 3 2.3 Groundwater and Caving ...................................................................................................... 4 2.4 Utilities ................................................................................................................................ 5 3.0 FAULTING AND SEISMICITY ............................................................................................................ 5 3.1 Deterministic Analysis .......................................................................................................... 5 3.2 Probabilistic Analysis ............................................................................................................ 6 3.3 2022 CBC Seismic Design Parameters .................................................................................... 6 4.0 GEOLOGIC HAZARDS ...................................................................................................................... 8 4.1 Surface Fault Rupture and Ground Shaking ........................................................................... 8 4.2 Seismic Hazards .................................................................................................................... 8 4.2.1 Liquefaction ........................................................................................................................ 8 4.2.2 Seismic Settlements ........................................................................................................... 9 4.2.3 Earthquake-Induced Landslides ........................................................................................ 9 4.2.4 Lateral Spreading ............................................................................................................... 9 4.2.5 Tsunamis and Seiches ...................................................................................................... 10 4.2.6 Flood Hazards ................................................................................................................... 10 5.0 GEOTECHNICAL CONSIDERATIONS AND RECOMMENDATIONS ................................................. 10 5.1 Site Preparation .................................................................................................................. 11 5.1.1 Existing Improvements. ................................................................................................... 11 5.1.2 Surface Vegetation ........................................................................................................... 11 5.1.3 Underground Utilities ...................................................................................................... 11 5.2 Site Grading ........................................................................................................................ 12 5.2.1 Undocumented Fill/Disturbed Native Soils ..................................................................... 12 5.2.2 Expansive Soils ................................................................................................................. 12 ii TABLE OF CONTENTS- continued Section Page 5.2.3 Remedial Grading ............................................................................................................ 13 a) Proposed Building and Ancillary Improvements ................................................. 13 b) Exterior Slab-on-Grade/Concrete Flatwork /Hardscape/Pavement Support ........ 13 5.2.4 Temporary Excavation ................................................................................................ 14 a) Temporary Sloping. .............................................................................................. 14 b) Temporary Shoring .............................................................................................. 15 c) Slot Cutting Adjacent to Existing Structure Foundations .................................... 15 5.2.5 Suitable Soils and Imported Soils .................................................................................... 16 5.2.6 Backfilling and Compaction Requirements ..................................................................... 16 5.2.7 Tests and Observations .............................................................................................. 17 5.3 Foundation Design ............................................................................................................. 17 5.3.1 Conventional Footing Foundation ............................................................................ 17 a) Minimum Footing Dimension and Reinforcement. ............................................. 17 b) Allowable Soils Bearing Capacity ......................................................................... 18 c) Lateral Resistance ................................................................................................ 18 d) Settlements. ......................................................................................................... 19 5.3.2 Retaining Walls .......................................................................................................... 19 5.3.3 Footing/Foundation Observation .............................................................................. 21 5.4 Slabs-On-Grade .................................................................................................................. 21 5.5 Asphaltic Concrete (AC) Flexural Pavement Design ........................................................... 22 5.6 Portland Cement Concrete (PCC) Pavements ..................................................................... 23 5.7 Site Drainage ...................................................................................................................... 24 5.8 Soil Corrosivity Evaluation .................................................................................................. 24 5.8.1 Concrete Corrosion .......................................................................................................... 25 5.8.2 Metal Corrosion ............................................................................................................... 25 5.9 Utility Trenches .................................................................................................................. 26 5.10 Plan Review, Observations and Testing........................................................................... 26 6.0 FIELD PERCOLATION TEST DATA ............................................................................................. 27 7.0 CLOSURE ................................................................................................................................. 28 APPENDIX A ........................................................................................................................................ 30 Site Exploration .................................................................................................................................. 30 Plate A Boring and Percolation Test Location Plan Plates B-1 and B-2 Field Logs of Borings Plates B-P1 and B-P2 Field Logs of Percolation Borings iii TABLE OF CONTENTS- continued Section Page Laboratory Tests................................................................................................................................. 31 Moisture Content and Density Tests .......................................................................................................... 31 Consolidation and Direct Shear Tests ......................................................................................................... 31 Soil Corrosivity ............................................................................................................................................. 31 Maximum Dry Density/Optimum Moisture Content Test ......................................................................... 31 Expansion Test ............................................................................................................................................. 32 Plates C-1 through C-3 Uni-axial Consolidation Test Results Plates D-1 through D-3 Direct Shear Test Results Plates H-1 and H-2 Percolation Test Data Sheet APPENDIX B – SITE FAULTING/SEISMICITY DATA Plates I-1 and I-2 EQFAULT – Deterministic Estimation of Peak Acceleration from Digitized Faults within 100 km-radius from the Site APPENDIX C - LIST OF REFERENCES Site Location Map – Figure 1 Local Geologic Map – Figure 2 Local Seismic Hazard Map – Figure 3 National Flood Hazard Layer FIRMette – Figure 4 Nearby Building Surcharge Consideration and Retaining Wall Drainage Details – Figure 5 ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 1 1.0 INTRODUCTION This Soils Report presents the results of ASE's geotechnical investigation for the proposed community hub building (the Building), located within the Santa Ana Zoo, at 1801 East Chestnut Avenue, in the City of Santa Ana, California (the Site). The approximate location of the Site is shown on Figure 1, Site Location Map. The purpose of this investigation was to evaluate the general subsurface soil conditions at the Site and provide geotechnical recommendations for the design and construction of the Building. This Soils Report presents the summary of the data collected, and the results of ASE's engineering evaluations/analyses, which provide the basis for the formulation of relevant geotechnical conclusions and recommendations. 1.1 Project Outline ASE understands that the following information is applicable at the time of this Soils Report preparation. 1.1.1 Building/Development Scope: Based on the provided information, ASE understands that the Building will be located along the east perimeter of the zoo, west of the overflow parking lot and north of lawn and proposed entry village. The Building will be approximately 6000 square feet in planar dimension for education, containing flex classrooms and a new holding building for ambassador animals. The other appurtenant improvements are likely to include signage, landscape, pavement, utilities and hardscape. 1.1.2 Structural Loading for Geotechnical Analyses: In the absence of structural loading information and for the purpose of foundation analysis, ASE has assumed that the Building will have a maximum concentrated column load (D+L) on the order of 40 kips when supported by isolated pad footings or have a maximum line load (D+L) not exceeding 3,000 pounds per linear foot (plf) when supported on continuous spread footings. For any new secondary structural improvements (i.e. site walls, trash enclosures, signs, etc.), ASE has assumed a maximum concentrated column load (D+L) on the order of 10 kips when supported by isolated pad footings or a maximum line load (D+L) not exceeding 1,500 pounds per linear foot (plf) when supported on continuous spread footings. Tolerable total and differential static settlements resulted from the above structural loadings on the order of one-half (1/2) inch and one-quarter (1/4) inch over a 30-foot distance, respectively, have been considered by ASE. 1.2 Scope of Investigation In accomplishing the subject investigation, ASE's staff had performed the following geotechnical tasks: D a t e : Ja n u a r y , 2 0 2 4 As s o c i a t e d S o i l s E n g i n e e r i n g , I n c . Si t e L o c a t i o n M a p Pr o j . N a m e : Pr o p o s e d C o m m u n i t y H u b B u i l d i n g 18 0 1 E . C h e s t n u t A v . , S a n t a A n a , C A 28 6 0 W a l n u t A v e n u e Si g n a l H i l l , C A 9 0 7 5 5 Fi g u r e 1 P r o j . N o . : 71 6 0 . 2 3 Te l ( 5 6 2 ) 4 2 6 - 7 9 9 0 F a x ( 5 6 2 ) 4 2 6 - 1 8 4 2 Su b j e c t S i t e (18 0 1 E . C h e s t n u t Av . , S a n t a A n a , C A ) N Pacific Blvd ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 2 A. Review of readily available background information, including in-house geotechnical data, geotechnical literature, geologic maps, seismic hazard maps, and literature relevant to the Site. B. A geotechnical site reconnaissance to observe the general Site conditions and to select/mark boring locations, followed by 72-hour notification to Underground Service Alert prior to field investigation. C. Field exploration consisting of drilling two (2) exploratory borings to depths of 25 feet 11 inches and 26 feet below respective existing grades. ASE staff logged and sampled representative soils encountered in each exploratory boring. Locations of the exploratory borings on site are shown on the Boring and Percolation Test Location Plan, Plate A, in Appendix A. D. Field percolation testing at two (2) percolation test borings location (i.e. Percolation Borings B-P1 and B-P2, with approximate locations shown on the Boring and Percolation Test Location Plan, Plate A, in Appendix A) to measure infiltration rates of site soils as part of the requirements for the planning and design of on-site stormwater Low Impact Development (LID) facilities. E. Laboratory testing on retrieved representative soil samples for classification and for determination of pertinent engineering properties. F. Engineering analyses of data obtained from literature review, the site investigation and laboratory testing covering the following aspects: • Evaluation of general subsurface conditions and description of types, distribution, and engineering characteristics of subsurface materials. • Assessment and quantification of geologic/seismic hazards based on the pertinent criteria required by the California Geological Survey (CGS). • Determination of the seismic design parameters in accordance with Chapters 16 and 18 of the California Building Code, 2022 Edition (2022 CBC; Reference 5). • Evaluation of the suitability of on-site soils for foundation support, followed by establishment of qualification criteria for on-site or imported fill material, and recommendations for site remedial grading and subgrade preparation for the Building. • Recommendations of suitable foundation systems including conventional shallow footing foundations, covering minimum dimensions, allowable bearing capacity, estimated settlement, and lateral resistance. • Recommendations for subgrade preparation and design parameters for slab-on-grade and flatwork support. • Recommendations for temporary excavation, shoring and trenching. • Evaluation of the corrosion and expansion potential of the on-site materials. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 3 • Computation of design infiltration rates of site soils required for on-site stormwater low impact development (LID) system planning and design. G. Preparation of this Soils Report presenting the works performed, the data acquired, and our conclusions and geotechnical recommendations for the design and construction of the Building. Also presented are the recommended design infiltration rates for on-site stormwater LID system planning and design. Please note that ASE's geotechnical investigation did not include any evaluation or assessment of hazardous or toxic materials which may or may not exist on or beneath the site. ASE does not consult in the field of potential site contamination/mitigation. 2.0 SITE AND SUBSURFACE CONDITIONS 2.1 Location and Surface Conditions The Building are to be located within the Santa Ana Zoo at 1801 East Chestnut Avenue in the City of Santa Ana. The Site is bound north and northeast by East 1st Street and the Santa Ana Freeway, respectively. Zoo Lane and East Main Street bound the Site to the west and south, respectively. The Building will be located easterly within the existing Santa Ana Zoo facility. The area of the Building is presently occupied by open unpaved entry walkway and turf lawn, and is generally uniform and level. Existing zoo buildings throughout the Site are generally one to two-story in height. Animal enclosures, small bushes and trees are present throughout the Site. Asphaltic concrete (AC) paved parking lots and access roads are present to the south and east of the Site. 2.2 Subsurface Conditions 2.2.1 Artificial Fill (af): Artificial fill was not observed in any of ASE’s exploratory borings and percolation test borings but may be present at other areas of the site, or could be encountered during site grading, subject to the observation and confirmation of the Geotechnical Consultant. 2.2.2 Younger Fan Deposits (Qyfa): Native site soils consisting of Holocene-age younger fan deposits were encountered from surface to the maximum explored depth of 26 feet in ASE’s exploratory boring B-1. Per Reference 4, the younger fan deposits are characterized as unconsolidated sand, sandy silt, and silt of the Santa Ana River, Santiago Creek and Peters Creek. In specific, the on-site fan deposits materials consist of ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 4 sandy silts, silty sands, and gravel. Figure 2, Local Geologic Map, excerpted from Reference 2, shows geologic material distribution in the vicinity of the Site. Blow counts recorded from advancing Modified California barrel sampler empirically indicate that the granular, sandy strata of site native alluvial soils were in a medium dense to very dense condition, whereas the fine-grained, cohesive strata encountered (i.e. sandy silts) were generally in a firm to stiff condition. Site subsurface soils were, in general, in a dry to moist condition within the explored depths at the time of ASE’s site investigation. More detailed descriptions of soils encountered and conditions observed during the subsurface exploration are shown in the Field Logs of Boring ("B" Plates) and Field Logs of Percolation Boring (“B-P” Plates) in Appendix A, together with information of soil classifications, depths and types of soil samples, blow counts, field dry densities and moisture contents, and corresponding laboratory tests performed. 2.3 Groundwater and Caving During field exploration, groundwater was not encountered in ASE’s exploratory borings to the maximum explored depth of 26 feet in Boring B-1. Published groundwater data in Reference 4 indicates that the historic high groundwater levels in the vicinity of the Sites are approximately 40 feet deep. A search on Google Earth indicates that the Site is approximately 129 to 132 feet above Mean Sea Level (MSL). Information available from the State of California Water Resources Control Board Geotracker website (http://geotracker.waterboards.ca.gov) indicates that the groundwater elevation in groundwater monitoring well B-22, (UNOCAL #4991: 1601 East 1st Street – located approximately 1/4 mile northwest of the Site), was 63.4 below grade on May 29, 2007, which was the most recent reading in this well. The ground surface elevation at this well location (taken from Google Earth images) is approximately 131 feet above MSL, which is approximately the same as the Site grades. Additional information available from the same Geotracker website indicates that the groundwater elevation in groundwater monitoring well MW-7, (Thrift Oil $377/ ARCO #7741: 324 South Grand Avenue – located approximately 1/2 mile west of the Site), was 64.57 below grade on June 22, 2005, which was the most recent groundwater reading in the well. The ground surface elevation at this well location (taken from Google Earth images) is approximately 122 feet above MSL, which is approximately 7 to 10 feet lower Site grades. Generally, seasonal and long-term fluctuations in the groundwater may occur as a result of variations in subsurface conditions, rainfall, run-off conditions and other factors. Therefore, variations in groundwater levels from the short-term observations made in ASE’s exploratory borings cannot be ruled out. Please notes that ASE’s exploratory borings were not meant for groundwater monitoring. Pr o j e c t : Qy f a Pr o j . N o . : 71 6 0 . 2 3 Da t e : Ja n u a r y , 2 0 2 4 Lo c a l G e o l o g i c M a p Yo u n g e r F a n D e p o s i t s : u n c o n s o l i d a t e d sa n d , s a n d y s i l t a n d s i l t o f S a n t a A n a R i v e r , Sa n t i a g o C r e e k , a n d P e t e r s C r e e k Si g n a l H i l l , C A 9 0 7 5 5 Te l ( 5 6 2 ) 4 2 6 - 7 9 9 0 F a x ( 5 6 2 ) 4 2 6 - 1 8 4 2 (P a r t i a l E x t r a c t o f t h e Q u a t e r n a r y G e o l o g i c M a p o f t h e S a n t a A n a 7 . 5 - M i n u t e Q u a d r a n g l e , C a l i f o r n i a D i v i s i o n o f M i n e s a n d G e o l o g y , S e i s m i c H a z a r d Z o n e R e p o r t 0 1 2 , 1 9 9 8 ) LEGEND Ap p r o x i m a t e S i t e L o c a t i o n As s o c i a t e d S o i l s E n g i n e e r i n g , I n c . Pr o p o s e d C o m m u n i t y H u b B u i l d i n g 18 0 1 E . C h e s t n u t A v . , S a n t a A n a , C A 28 6 0 W a l n u t A v e n u e Fi g u r e 2 Su b j e c t S i t e ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 5 The use of hollow-stem augers during drilling precluded observation of potential caving conditions which may have otherwise occurred in an uncased hole. Caving and/or sloughing were not measured during the extraction of auger stem at the completion of boring operations. However, caving and/or soil sloughing may be likely in excavations greater in dimension than our exploratory borings. 2.4 Utilities No overhead or underground utilities were encountered or disturbed during the course of ASE's on-site exploration. However, underground utilities servicing the existing buildings may be present on site, and should be located and incorporated into site development plans accordingly. 3.0 FAULTING AND SEISMICITY Santa Ana, like the rest of southern California, is located within a seismically active region as a result of being located near the active margin between the North American and Pacific tectonic plates. The principal source of seismic activity is movement along the northwest-trending regional faults such as the San Andreas, San Jacinto, Newport-Inglewood and Whittier-Elsinore fault zones. By the definition of CGS, an active fault is one which has had surface displacement within the Holocene Epoch (roughly the last 11,000 years). The CGS has defined a potentially active fault as any fault which has been active during the Quaternary Period (approximately the last 1,600,000 years). These definitions are used in delineating Earthquake Fault Zones as mandated by the Alquist-Priolo Geologic Hazard Zones Act of 1972 and as subsequently revised in 1997 as the Alquist-Priolo Earthquake Fault Zoning Act and Earthquake Fault Zones. The intent of the act is to require fault investigations on sites located within Special Studies Zones to preclude new construction of certain inhabited structures across the trace of active faults. The subject Site is not located within the Alquist-Priolo Earthquake Fault Zone. Additionally, the site is not located within a seismic hazard zone per CGS's mapping. Several sources were researched for information pertaining to site seismicity. The majority of data was obtained from the program, EQFAULT, by Blake (2000) that allows for an estimation of peak horizontal ground acceleration (PGA) using a data file of approximately 150 digitized California faults. This program compiles information including the dominant type of faulting within a particular region, the maximum earthquake magnitude each fault is capable of generating, and the approximate location of the fault trace. Printouts of the Site fault search results are shown on Plates I-1 and I-2 in Appendix B. 3.1 Deterministic Analysis The Site is likely to be subject to strong seismic ground shaking during the life of the project. Based on the referenced literature and deterministic analysis performed with the EQFAULT software, the San Joaquin ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 6 Hills Fault, approximately 3.9 miles (6.3 km) from the Site, would probably generate the most severe ground motions. A Maximum Probable Earthquake (MPE), i.e. the maximum earthquake that is considered likely to occur during a 100-year time interval, of 6.6 Mw (moment magnitude as per USGS) has been assessed along the San Joaquin Hills Fault. As shown on Plate I-2 in Appendix B, estimated PGA resulting from a MPE event on the San Joaquin Hills Fault is on the order of 0.457g should this event occur at the fault’s closest approach to the Site. Other nearby active faults include the Newport-Inglewood (L.A.Basin) Fault and the Newport-Inglewood (Offshore) Fault, located approximately 9.6 miles (15.5 km) and 11.3 miles (18.2 km) away, respectively. In sum, 40 active or potentially active faults have been identified within 62 miles (100 km) of the Site. 3.2 Probabilistic Analysis The seismicity of the Site was evaluated utilizing probabilistic analysis available from USGS Unified Hazard Tool (https://earthquake.usgs.gov/hazards/interactive/). The Maximum Probable Earthquake (MPE) and the Maximum Considered Earthquake (MCE) that carry 10 percent and 2 percent exceedance probabilities, respectively, in 50 years have been considered. Based on a typical damping ratio of 5% and a Vs30 value of 259 m/sec, corresponding with “Site Class D”, nearest to the derived Vs30 value of 294 m/sec from the “Set Site Parameters for Web Services”’’ function as part of the “Hazard Spectrum Calculator (Local)” application available from the “OPENSHA” website, three spectral acceleration values representing peak ground acceleration (PGA), spectral acceleration for structural period of 0.2 second (Sa – 0.2 sec; typical of low-rise buildings) and spectral acceleration for structural period of 1.0 second (Sa – 1.0 sec; typical of multi-story buildings) have been analyzed and are tabulated below. Seismic Acceleration Values from USGS’s Unified Hazard Tool 3 Latitude Longitude Vs30 (m/sec) Scenario Acceleration (g) PGA Sa – 0.2 sec Sa – 1.0 sec N 33.7429  W 117.8417  259 MPE 1 0.3837 0.9436 0.5290 MCE 2 0.6370 1.5084 0.9860 1. MPE scenario carries a 10% exceedance probability in 50 years. 2. MCE scenario carries a 2% exceedance probability in 50 years. 3. Edition: Conterminous U.S. 2014 (update) (4.2.0) 3.3 2022 CBC Seismic Design Parameters The earthquake design requirements listed in 2022 CBC and other governing standards account for faults classified as "active", in accordance with the most recent fault listing as per the United States Geological Survey (USGS) or the CGS. The seismic design of the proposed structures should be implemented in accordance with the applicable provisions stipulated in 2022 CBC unless otherwise specified by the governing authority having jurisdiction over the project. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 7 The 2022 CBC seismic design criteria for the Site based on a Site Class of “D”, determined based on the inferred Vs30 value of 294 m/sec shown in Section 3.2 above and the criteria of Table 20.3-1 of ASCE 7-16 (Reference 13), a Risk Category II and a scenario of Risk-Targeted Maximum Considered Earthquake (MCER) that carries a 2% exceedance probability in 50 years had been determined utilizing the OSHPD Seismic Design Maps web-application (http://seismicmaps.org) and the criteria stipulated in Chapters 11 and 12 of Reference 5, including Supplements 1 and 3. Summaries of the seismic coefficients for the Site are tabulated below. 2022 CBC SEISMIC DESIGN PARAMETERS Site Latitude: N 33.7429 Site Longitude: W 117.8417 Risk Category a II Seismic Parameter Recommended Value Site Class b D Soil Profile Name b Stiff Soil Profile Site Coefficient, Fa c 1.0 Site Coefficient, Fv d 1.842 0.2-Second Spectral Response Acceleration, SS e 1.284g 1.0-Second Spectral Response Acceleration, S1 f 0.458g Adjusted 0.2-Second Spectral Response Acceleration, SMS g 1.284g Adjusted 1.0-Second Spectral Response Acceleration, SM1 h 0.844g Design 0.2-Second Spectral Response Acceleration, SDS i 0.856g Design 1.0-Second Spectral Response Acceleration, SD1 j 0.562g Long -Period Transition Period, TL k 8 sec Mapped MCEG Geometric Mean Peak Ground Acceleration, PGA l 0.538g Site Coefficient, FPGA m 1.1 MCEG Peak Ground Acceleration adjusted for Site Class Effect, PGAM n 0.592g Risk Category I or II or III IV Seismic Design Category based on S1 o N/A N/A Seismic Design Category based on SDS p D D Seismic Design Category based on SD1 q D D a Per 2022 CBC Table 1604.5 h Per 2022 CBC Equation 16-21 b Per 2022 CBC Section 1613.2.2 i Per 2022 CBC Equation 16-22 c Per 2022 CBC Table 1613.2.3(1). Note: If simplified design procedure of j Per 2022 CBC Equation 16-23 Section 12.14 of ASCE 7-16 is adopted, the Fa value should be determined k Per ASCE 7-16 Figure 22-14 per Section 12.14.8.1 of ASCE 7-16 with no need for Fv, SMS, SM1 values. l Per ASCE 7-16 Figure 22-9 d Per 2022 CBC Table 1613.2.3(2), provided Cs values are determined by m Per ASCE 7-16 Table 11.8-1 Equations 12.8-2, 12.8-3 and 12.8-4 of ASCE 7-16. n Per ASCE 7-16 Equation 11.8-1 = PGA x FPGA e Per 2022 CBC Figure 1613.2.1(1) o Per 2022 CBC Section 1613.2.5 f Per 2022 CBC Figure 1613.2.1(2) p Per 2022 CBC Table 1613.2.5(1) g Per 2022 CBC Equation 16-20 q Per 2022 CBC Table 1613.2.5(2) Please note, seismic design parameters for Site Classes “D”, “E”, and “F” should be obtained from site- specific seismic hazard analysis unless exceptions stipulated in Section 11.4.8 of ASCE 7-16 are invoked. The values listed in the table above reflect invocation of such exceptions (see Footnotes c and d beneath the said table). Please note that, as S1 value is greater than 0.2, should exception per Item 1 in Section 11.4.8 of ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 8 ASCE 7-16, Supplement 3 be applied, a 50% increase on the SM1 value derived from Equation 11.4-2 of ASCE 7-16 (or Equation 16-21 of 2022 CBC) is required. The increased SM1 value should then serve as the basis for the derivation of SD1 value for structural design. Please note that the SM1 and SD1 values listed in the table on the preceding page do not reflect such 50% increase. If the structural design of the Building cannot be supported by the invoked exceptions, the Geotechnical Consultant should be contacted for performing additional, site-specific seismic hazard analysis such that values of site-specific design parameters could be established. Please also note that conformance to the 2022 CBC seismic design criteria does not constitute any kind of guarantee or assurance that significant structural damage or ground failure will not take place during the occurrence of a MCER event. The primary goal of seismic design is to protect life and not to avoid all damage, since such design may be economically prohibitive. Following a major earthquake, a building may be damaged beyond repair, yet not collapse. The Structural Consultant should review the pertinent parameters to evaluate the seismic design. 4.0 GEOLOGIC HAZARDS 4.1 Surface Fault Rupture and Ground Shaking The Site is not located within an Alquist-Priolo Earthquake Fault Zone. No known active or potentially active faults are shown crossing the Site on published maps reviewed. No evidence for active faulting was encountered in the exploratory excavations performed during this evaluation. The risk of surface rupture at the Site is considered very low. However, being in close proximity to several known active and potentially active faults, severe ground shaking should be expected during the life of the proposed development. 4.2 Seismic Hazards 4.2.1 Liquefaction: As evidenced in Figure 3, Local Seismic Map, the Site is not within an area identified by CGS as having a potential for soil liquefaction when subject to an MPE event. The term "liquefaction" describes a phenomenon in which a saturated cohesionless soil loses strength and acquires a degree of mobility as a result of strong ground shaking during an earthquake. The factors known to influence liquefaction potential include soil type and depth, grain size, relative density, groundwater level, degree of saturation, and both the intensity and duration of ground shaking. The soils to the maximum explored depth of 26 feet primarily consist of dense to very dense granular, sandy soils. During ASE’s field exploration, groundwater was not encountered to the maximum explored depth of 26 feet. Per Reference 4, historic high groundwater contour in the vicinity of the Site is ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 9 approximately 40 feet below grade. Additionally, the groundwater levels in groundwater monitoring wells closest to the Site were in excess of 60 feet below well grades, as per reviewed from the State Geotracker well records. Considering that: 1) site subsurface soils have been classified as Holocene-age younger fan deposits consisting of dense to very dense granular, sandy soils within the maximum explored depth of 26 feet and likely beyond; 2) a PGAM of 0.592g from 2022 CBC seismic design criteria; 3) the historic high groundwater level is 40 feet deep per CGS and likely exceeding 60 feet deep per nearby groundwater monitoring well data; and 4) an earthquake magnitude of 6.6 Mw derived per EQFAULT software, the potential for the occurrence of seismically-induced liquefaction at the Site has been assessed to be nil, per the criteria stipulated in SP 117A (Reference 2). 4.2.2 Seismic Settlements: Ground accelerations emitted from a seismic event can cause densification of loose soils both above and below the groundwater table that may result in settlements on ground surface due to volumetric compression of soil mass. This phenomenon is often referred to as seismic settlement and commonly takes place in relatively clean sands, as well as soils with low plasticity and less fines. Although the earth materials on site include medium dense to very dense granular, sandy soils within the maximum depth explored, and are considered non-liquefiable as per stated in Section 4.2.1 above, they may still undergo minor seismically- induced volumetric densification above groundwater level upon a MCE event. The settlement of site granular, sandy materials in their present state as a result of seismically- induced densification (i.e. “dry” seismic settlement) is estimated to be less than one-half (1/2) inch. Such magnitude of seismically-induced dry soil settlement is expected to affect relatively large area. Thus, the corresponding differential settlement over short distances is likely to be negligible. 4.2.3 Earthquake-Induced Landslides: As evidenced in Figure 3, the Site is not located within an area identified as having a potential for earthquake-induced landslides. There is lack of significant relief on or adjacent to the Site. During ASE’s field investigation, there was no indication that recent landslides or unstable slope conditions exist on or adjacent to the Site that would otherwise result in a landslide hazard to the Building or adjacent properties. The potential for earthquake-induced landslides at the Site is considered nil. 4.2.4 Lateral Spreading: Lateral spreading, a phenomenon associated with seismically-induced soil liquefaction, is a display of lateral displacement of soils due to inertial motion and lack of lateral support during or post (P a r t i a l E x t r a c t o f t h e E a r t h q u a k e Z o n e s o f R e q u i r e d I n v e s t i g a t i o n S a n t a A n a 7 . 5 - M i n u t e Q u a d r a n g l e , C a l i f o r n i a G e o l o g i c a l S u r v e y , d a t e d 2 0 1 6 ) Pr o j e c t : Pr o j . N o . : 71 6 0 . 2 3 Da t e : Ja n u a r y , 2 0 2 4 LEGEND Fa u l t Z o n e A r e a Po t e n t i a l L i q u e f a c t i o n H a z a r d A r e a Te l ( 5 6 2 ) 4 2 6 - 7 9 9 0 F a x ( 5 6 2 ) 4 2 6 - 1 8 4 2 As s o c i a t e d S o i l s E n g i n e e r i n g , I n c . Pr o p o s e d C o m m u n i t y H u b B u i l d i n g 18 0 1 E . C h e s t n u t A v . , S a n t a A n a , C A 28 6 0 W a l n u t A v e n u e Fi g u r e 3 Lo c a l S e i s m i c H a z a r d M a p Si g n a l H i l l , C A 9 0 7 5 5 Ap p r o x i m a t e S i t e L o c a t i o n Po t e n t i a l L a n d s l i d e H a z a r d A r e a Su b j e c t S i t e ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 10 liquefaction. It is typically exemplified by the formation of vertical cracks on the surface of liquefied soils, and usually takes place on gently sloping ground or level ground with nearby free surface such as drainage or stream channel. Since there is no liquefaction potential at the Site, as per discussed in Section 4.2.1 above, the potential for the occurrence of lateral spreading is also nil at the Site. 4.2.5 Tsunamis and Seiches: Due to the elevation of the Site and absence of nearby waterfront, hazard from a tsunami is considered very low. Seiches are rhythmic movements of water within a lake or other enclosed or semi-enclosed body of water, generally caused by earthquakes. Since no lakes or other bodies of water lie on or near the Site, the hazard from seiches is not present at the Site. 4.2.6 Flood Hazards: The Site was located on the ESRII/FEMA Hazard Awareness site, as shown on Figure 4, National Flood Hazard Layer FIRMette. The Site is not located within the limits of the 100-year flood plain per FEMA Flood Insurance Rate Map (Map No. 06059C0277J, map revised December 3, 2009), and is located outside an area of 0.2-percent-annual-chance flood. 5.0 GEOTECHNICAL CONSIDERATIONS AND RECOMMENDATIONS Based on the results of field exploration, laboratory testing, and engineering analysis, it is ASE's geotechnical opinion that the major geotechnical factors affecting the design and construction of the Building include the following: 1. Soil disturbances as a result of site demolition, clearing and excavation operations. 2. Presence of loose, low density soils within the zone of foundation bearing strata. 3. Excavation and construction of new footings/foundations located adjacent to or near existing building foundation that might undermine stability. Therefore, it is of essential importance that the embedment depth of any new footing planned next to the existing footing be the same as the embedment depth of the existing footing. This will ensure that: a) no soils beneath the existing footing would be undermined resulting in the bearing support to the existing footing being compromised, and b) no undesirable surcharge would be imposed on the existing footing from and adjoining new footing. In consideration of the above factors, it is ASE’s opinion that overexcavation and backfilling with properly compacted fill in the areas of the Building, as recommended herein, will be essential to reduce unfavorable static settlements of underlying soils, and to provide satisfactory bearing stratum for the Building. The Nat i o n a l F l o o d H a z a r d L a y e r F I R M e t t e 0 500 1,0 0 0 1,5 0 0 2,0 0 0 250 Fee t Ü SEE F I S R E P O R T F O R D E T A I L E D L E G E N D A N D I N D E X M A P F O R F I R M P A N E L L A Y O U T SPE C I A L F L O O D HAZ A R D A R E A S Wit h o u t B a s e F l o o d E l e v a t i o n ( B F E ) Zon e A , V , A 9 9 Wit h B F E o r D e p t h Zon e A E , A O , A H , V E , A R Reg u l a t o r y F l o o d w a y 0.2 % A n n u a l C h a n c e F l o o d H a z a r d , A r e a s of 1 % a n n u a l c h a n c e f l o o d w i t h a v e r a g e dep t h l e s s t h a n o n e f o o t o r w i t h d r a i n a g e are a s o f l e s s t h a n o n e s q u a r e m i l e Zon e X Fut u r e C o n d i t i o n s 1 % A n n u a l Cha n c e F l o o d H a z a r d Zon e X Are a w i t h R e d u c e d F l o o d R i s k d u e t o Lev e e . S e e N o t e s . Zon e X Are a w i t h F l o o d R i s k d u e t o L e v e e Zon e D NO S C R E E N Are a o f M i n i m a l F l o o d H a z a r d Zon e X Are a o f U n d e t e r m i n e d F l o o d H a z a r d Zon e D Cha n n e l , C u l v e r t , o r S t o r m S e w e r Lev e e , D i k e , o r F l o o d w a l l Cro s s S e c t i o n s w i t h 1 % A n n u a l C h a n c e 17. 5 Wate r S u r f a c e E l e v a t i o n Coa s t a l T r a n s e c t Coa s t a l T r a n s e c t B a s e l i n e Pro f i l e B a s e l i n e Hyd r o g r a p h i c F e a t u r e Bas e F l o o d E l e v a t i o n L i n e ( B F E ) Eff e c t i v e L O M R s Lim i t o f S t u d y Ju r i s d i c t i o n B o u n d a r y Dig i t a l D a t a A v a i l a b l e No D i g i t a l D a t a A v a i l a b l e Unm a p p e d Thi s m a p c o m p l i e s w i t h F E M A ' s s t a n d a r d s f o r t h e u s e o f dig i t a l f l o o d m a p s i f i t i s n o t v o i d a s d e s c r i b e d b e l o w . The b a s e m a p s h o w n c o m p l i e s w i t h F E M A ' s b a s e m a p acc u r a c y s t a n d a r d s The f l o o d h a z a r d i n f o r m a t i o n i s d e r i v e d d i r e c t l y f r o m t h e aut h o r i t a t i v e N F H L w e b s e r v i c e s p r o v i d e d b y F E M A . T h i s m a p was e x p o r t e d o n 1 / 4 / 2 0 2 4 a t 2 : 5 1 P M a n d d o e s n o t re f l e c t c h a n g e s o r a m e n d m e n t s s u b s e q u e n t t o t h i s d a t e a n d tim e . T h e N F H L a n d e f f e c t i v e i n f o r m a t i o n m a y c h a n g e o r bec o m e s u p e r s e d e d b y n e w d a t a o v e r t i m e . Thi s m a p i m a g e i s v o i d i f t h e o n e o r m o r e o f t h e f o l l o w i n g m a p ele m e n t s d o n o t a p p e a r : b a s e m a p i m a g e r y , f l o o d z o n e l a b e l s , le g e n d , s c a l e b a r , m a p c r e a t i o n d a t e , c o m m u n i t y i d e n t i f i e r s , FIR M p a n e l n u m b e r , a n d F I R M e f f e c t i v e d a t e . M a p i m a g e s f o r unm a p p e d a n d u n m o d e r n i z e d a r e a s c a n n o t b e u s e d f o r re g u l a t o r y p u r p o s e s . Leg e n d OTH E R A R E A S O F FLO O D H A Z A R D OTH E R A R E A S GEN E R A L STR U C T U R E S OTH E R FEA T U R E S MAP P A N E L S 8B 20. 2 The p i n d i s p l a y e d o n t h e m a p i s a n a p p r o x i m a t e poi n t s e l e c t e d b y t h e u s e r a n d d o e s n o t r e p r e s e n t an a u t h o r i t a t i v e p r o p e r t y l o c a t i o n . 1:6 , 0 0 0 117 ° 5 0 ' 4 9 " W 3 3 ° 4 4 ' 5 0 " N 117 ° 5 0 ' 1 1 " W 3 3 ° 4 4 ' 2 0 " N Bas e m a p I m a g e r y S o u r c e : U S G S N a t i o n a l M a p 2 0 2 3 AS E # 7 1 6 0 . 2 3 FI G U R E 4 ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 11 grading recommendations provided herein should be reviewed when final project concept and grading plans are available. It is assumed that the proposed finish grades will be close to the existing site grades (+one foot). 5.1 Site Preparation 5.1.1 Existing Improvements: Prior to grading operations, it will be necessary to remove any existing improvements, including any remaining buried obstructions, which may be in the areas of the Building. Structure removal should include foundations. Concrete flatwork and asphalt pavements should also be removed from the areas of proposed construction. Concrete and asphalt fragments from site demolition operations should be disposed of off-site, unless they can be stockpiled and processed to meet the specifications for Crushed Miscellaneous Base ("CMB"), Processed Miscellaneous Base ("PMB") or Pulverized Miscellaneous Base ("PMB") as outlined in Sections 200-2.4, 200-2.5 or 200-2.8, respectively, of the latest edition of the "Standard Specifications for Public Works Construction" (the Greenbook) and reused as approved fill or base material. 5.1.2 Surface Vegetation: Surface vegetation should be stripped from areas of proposed construction. Stripping should penetrate six (6) inches into surface soils. Any soil contaminated with organic matter (such as root systems or strippings mixed into the soil) should be disposed of off-site or set aside for future use in non-structural landscaped areas. Removal of trees and shrubs should include rootballs and attendant root systems. 5.1.3 Underground Utilities: Any underground utilities to be abandoned within the zone of proposed construction should be cut off a minimum of five (5) feet from the area of the Building. The ends of cut-off lines should be plugged a minimum of five (5) feet with concrete exhibiting minimum shrinkage characteristics to prevent water migration to or from hollow lines. Capping of lines may also be required should the plug be subject to any line pressure. Alternatively, deep hollow lines may be left in place provided they are filled with concrete or 2-sack control density fill (slurry fill). No filled line should be permitted closer than two (2) feet from the bottom of future footings unless it has been evaluated and approved by the Geotechnical Consultant. Please note that local ordinances relative to abandonment of underground utilities, if more restrictive, should be complied with. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 12 5.2 Site Grading In minimizing the potential adverse effects associated with the development of excessive total or differential settlement underneath the Building, as well as to ensure uniform bearing competency for the foundations and slabs, preparation of on-site soils is recommended in the following sections. 5.2.1 Undocumented Fill/Disturbed Native Soils: Although not encountered in ASE’s exploratory borings, any undocumented fill soil, if encountered during site grading in the areas of the Building, as well as any native soils disturbed during demolition and clearing operations, should be excavated full depth under the observation and confirmation by the Geotechnical Consultant. Lateral extent of overexcavation beyond the Building perimeters, where possible, should be to a minimum distance equal to the depth of undocumented fill/disturbed soil encountered or four (4) feet, whichever is greater. For other secondary improvements such as free-standing walls or hardscape, the lateral extent of removal should be to a minimum distance equal to the depth of undocumented fill/disturbed soils encountered or eighteen (18) inches, whichever is greater. The exposed excavation bottom should be scarified/reworked to a minimum one (1) foot depth and recompacted to at least 90 percent relative compaction with a minimum moisture content of two (2) percentage points above optimum moisture content, prior to backfilling with approved soils as specified in Section 5.2.6. 5.2.2 Expansive Soils: Laboratory testing result on a near surface site soil sample indicates "Low” soil expansion potential (i.e. Expansion Index, EI = 31 per ASTM D4829-21 Test Method) as defined in Table 1 of ASTM D4829-21 Test Method and Section 1803.5.3 of 2022 CBC. Lightly loaded structural elements such as shallow foundations and slabs could undergo noticeable movements, at time unevenly, in areas underlain by soils with “Low” expansion potential. It should be noted that design provisions such as increased reinforcements, deeper foundations or other measures discussed in this Soils Report may help to alleviate the undesirable effects of “Low” soils expansion on the slabs and structures but may not completely eliminate the problem. It is recommended that the soil expansion potential be re-evaluated through additional testing during or after rough grading operations to verify the design adequacy of footing foundation and lab-on-grade against the re-tested soil expansion potential as heterogeneity within soil mass is not uncommon. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 13 5.2.3 Remedial Grading: a) Proposed Building and Ancillary Improvements: To provide competent bearing support for the proposed restroom building and to reduce potential static settlements, it is recommended that on-site soils within the footprint of the restroom building be overexcavated and removed uniformly to a minimum depth of four (4) feet below existing grade or finish grade, whichever is lower, and replaced with properly compacted fill such that the building foundation is supported on a re-engineered, compacted fill layer. The excavation bottom should be near uniform. The overexcavation should extend laterally to a minimum distance of four (4) feet beyond the restroom perimeters, wherever possible. The fill should be compacted to at least 90 percent relative compaction with minimum moisture content of two (2) percentage points above optimum moisture content. On-site subgrade soils at their present state generally exhibit an EI within the preferred value and, thus, are deemed suitable for re-use as fill. For foundations supporting ancillary improvements, it is recommended that on-site soils within the footprints of the ancillary improvements be overexcavated and removed uniformly to a minimum depth of three (3) feet below existing grade or finish grade, whichever is lower, and replaced with properly compacted fill such that the foundations for ancillary improvements are supported on a re-engineered, compacted fill layer. The excavation bottoms should be near uniform. The overexcavation should extend laterally to a minimum distance of three (3) feet beyond structure perimeters, where possible. Soils exposed at excavation bottoms to a depth of one (1) foot should be scarified, reworked and recompacted to exhibit a minimum 90 percent relative compaction with a minimum moisture content of two (2) percentage points above optimum moisture content, prior to receiving fill placement. The exposed excavation bottom should be observed, tested, and approved by the Geotechnical Consultant prior to placing compacted fill. b) Exterior Slab-on-Grade/Concrete Flatwork/Hardscape/Pavement Support: For the purpose of reducing future unsightly and uneven movements and cracks of any exterior slab-on-grade, concrete flatwork, hardscape, or pavement, it is recommended that subgrade soils to a minimum depth of eighteen (18) inches below the bottom of and eighteen (18) inches laterally beyond the footprint of exterior concrete slab-on-grade/concrete flatwork/hardscape/ pavement should be overexcavated then backfilled and recompacted with suitable fill soils consisting of “Very Low” to “Low” expansive site or import material (EI ≤ 35), compacted to at least 90 percent relative compaction with a minimum moisture content of two (2) percentage points above optimum moisture content. Prior to placement of compacted fill, the upper six (6) ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 14 inches of exposed native subgrade should be reworked to at least 90 percent relative compaction with a minimum moisture of two (2) percentage points above optimum moisture content. Please note that if undocumented fill is encountered in any area to receive remedial grading discussed in Sections 5.2.3.a) or b) above, recommendations stipulated in Section 5.2.1 above, if more stringent, should be complied with. If all undocumented fill is not removed full depth in areas of exterior slab-on-grade, concrete flatwork, hardscape or pavement, the Owner should be made aware that more frequent maintenance and/or repair will likely be required. Please also note that, from geotechnical viewpoint, new landscape area with only softscape is not subject to subgrade preparation and remedial grading requirements mentioned in Sections 5.2.1 and 5.2.3. In case of the presence of localized loose soils, the overexcavations need to be deepened accordingly to delete the loose soil condition. However, this deepened overexcavation may be terminated when the exposed native, undisturbed soils exhibit a natural relative compaction greater than 85 percent, subject to testing and inspection by the representative from the Geotechnical Consultant. The Geotechnical Consultant’s field representative should be provided with appropriate construction details and staking during grading to verify that depths and/or locations of the recommended overexcavation are adequate. For areas on site that grading recommendations stipulated in both Sections 5.2.1 and 5.2.3 apply, the more stringent grading criteria between the two sections should govern. The depth of overexcavation should be reviewed by the Geotechnical Consultant during the actual construction. Any subsurface obstruction, buried structural elements, and unsuitable material encountered during grading, should be immediately brought to the attention of the Geotechnical Consultant for proper exposure, removal and processing, as recommended. 5.2.4 Temporary Excavation: Excavations of site soils deeper than 4 feet should be temporarily shored or sloped in accordance with Cal OSHA requirements. a) Temporary Sloping: In areas where excavations deeper than 4 feet are not adjacent to existing structures of public right-of-ways, sloping procedures may be utilized for temporary excavations. It is recommended that temporary slopes in both fill and native soils be graded no steeper than ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 15 1:1.5 (H:V) for excavations up to 10 feet in depth. The above temporary slope criteria are based on level soils conditions behind temporary slopes with no surcharge loading (structures, traffic) within a lateral distance behind the top of slope equivalent to the slope height. It is recommended that excavated soils be placed a minimum lateral distance from top of slope equal to the height of slope. A minimum setback distance equivalent to the slope height should be maintained between the top of slope and heavy excavation/grading equipment. Soil conditions should be reviewed by the Geotechnical Consultant as excavation progresses to verify acceptability of temporary slopes. Final temporary cut slope design will be dependent upon the soil conditions encountered, construction procedures and schedule. b) Temporary Shoring: Temporary shoring will be required for those excavations where temporary sloping as specified above is not feasible. Temporary cantilever shoring, if used, should be designed to resist an active earth pressure of 40 pounds per cubic foot (pcf) equivalent fluid pressure (EFP) for level soil conditions behind shoring. The resultant lateral deflection of shoring and surficial settlement immediately behind shoring are estimated to be on the order of one (1) to one and one half (1 ½) percent of the shored excavation depth. Should this ground deformation be intolerable to the existing structure, ASE should be consulted for more detailed analysis and further recommendations. The design of shoring should also include an additional lateral pressure equivalent to one-third (1/3) of the surcharge loading of existing structures and anticipated traffic, including delivery and construction equipment, when loading is within a distance from the shoring equal to the depth of excavation. In addition to the above, a minimum uniform lateral pressure of 100 pounds per square foot (psf) in the upper ten (10) feet of shoring should be incorporated in the design when normal traffic is permitted within ten (10) feet of the shoring. c) Slot Cutting Adjacent to Existing Structure Foundations: Prior to any excavation, the footings of the existing structure should be researched as it could compromise the stability of foundation when excavating site soils immediately next to or below any existing footing foundation. "A-B-C" slot cutting grading procedures may be utilized to accomplish the required overexcavation for areas adjacent to existing building foundation or improvements that might otherwise be undermined by the grading operation on the subject Site. As a general guideline, slot cutting would be necessary for overexcavation located within a ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 16 lateral distance from the existing structure or public right-of-ways equivalent to one (1) times the excavation depth. While the maximum width and sequence of slot-cuts should be evaluated in the field during grading operations based on conditions exposed during initial site grading adjacent to the existing structure, for preliminary planning purpose, the width per slot should not exceed six (6) feet. Increase of length per cut slot is possible upon inspection and evaluation of actual exposed slot cut condition by the Geotechnical Consultant during site grading. Care shall be exercised such that no soil is removed from underneath any existing shallow foundation. 5.2.5 Suitable Soils and Imported Soils: Any fill used for the completion of subgrade preparation for the building pad areas of the Building should consist of predominantly “Very Low” to “Low” expansive material exhibiting an EI not greater than 35, and should be exhibiting a relatively uniform gradation, free of debris, particles greater than 4 inches in maximum dimension, organic matter or other deleterious materials. Unless otherwise approved by the Geotechnical Consultant, the imported or blended fill materials should also comply with the following soil corrosivity criteria: Corrosivity Criteria for Select Fill and General Fill Soluble Sulfate (% by weight) (1) Soluble Chloride (ppm) (2) Resistivity Value (ohm-cm) (3) pH-Value (4) ≤ 0.1 ≤500 ≥ 2000 7.0 ~ 8.8 (1) California Test Method 417. (2) California Test Method 422. (3) ASTM G187-23 Test Method. (4) California Test Method 532. Imported fill soils or base materials should be examined by a representative of the Geotechnical Consultant and tested as necessary for evaluating their suitability for use as fill prior to being hauled to the Site. Final acceptance of any imported soil will be based upon review and testing of the soil actually delivered to the Site. All blended material to be used as fill must be tested and approved by the Geotechnical Consultant prior to being used for fill placement. 5.2.6 Backfilling and Compaction Requirements: Existing site soils at their present state and composition, unless indicated otherwise, are considered suitable for re-use as fill during site grading, provided they 1) free of debris, particles greater than 4 inches in maximum dimension, organic matter or other deleterious materials, 2) are not environmentally contaminated, and 3) adequately moisture conditioned to permit achieving the required compaction. No nesting of large particles (2 to 4-inch size) should be permitted during backfilling operations. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 17 On-site soils and import materials approved for use as fill should be placed in horizontal lifts not exceeding 8 inches in loose thickness, moisture conditioned to a minimum of two (2) percentage points above optimum moisture content, and compacted to a minimum 90 percent relative compaction. Unless otherwise stated, the measurement of relative compaction in this report should always refer to ASTM D1557-12(2021) Test Method. 5.2.7 Tests and Observations: All subgrade preparation, compaction, and backfill operations should be performed under the observation of and testing by the Geotechnical Consultant's field representative. An adequate number of field tests should be taken to ensure compliance with this report and local ordinances. If it is determined during grading that site soils require overexcavation to greater depths for obtaining proper support for the proposed structures, this additional work should be performed in accordance with the recommendations of the Geotechnical Consultant. 5.3 Foundation Design Provided that the site grading recommendations presented in Section 5.2.3a above are incorporated in project planning and design, and implemented during site construction, it is ASE’s opinion that the Building could be supported by conventional footing foundation. 5.3.1 Conventional Shallow Footing Foundation: a) Minimum Footing Dimension and Reinforcement: In order to mobilize sufficient soils bearing capacity supporting the new footings for the Building or any ancillary improvement (i.e. site walls, trash enclosures, signs, etc.), it is recommended that the following tabulated minimum footing embedments, widths and reinforcements for various footing types be considered. Minimum Footing Dimension & Reinforcement Continuous Spread Footing/Strip Footing Isolated Pad Footing Depth (1) (in) Width (in) Reinforcement (2) Depth (1) (in) Width (in) Reinforcement (2) 18 15 Four #4 bars – two near the top and two near the bottom 18 24 square Four #4 bars – two near the top and two near the bottom, applied bi-axially (1) Footing embedment measured from the nearest adjacent lowest soils grade. (2) Based strictly from geotechnical point of view. Foundation design details such as concrete strength, reinforcements, etc. should be established by the Structural Consultant. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 18 b) Allowable Soils Bearing Capacity: For footings complying with the minimum dimension requirements stipulated in Section 5.3.2a) above, the allowable soils bearing capacities, inclusive of both dead and live loads, should be as per tabulated below: Allowable Soils Bearing Capacity (psf) Increase per 12- inch Increment in Footing Width (psf) Increase per 12- inch Increment in Footing Depth (psf) Maximum Composite Ceiling Value (psf) Continuous Spread Footing/ Strip Footing Isolated Pad Footing 2,000 2,000 100 300 3,000 The allowable bearing capacities tabulated above may be increased by one-third (1/3) when subject to short-term, transient loading induced by wind or seismic activities. For any new footings that are within a lateral distance from any existing building footing equal to the depth of the new footing (D), the following tabulated reduction factors should be applied to the corresponding allowable soils bearing capacity values. Lateral Distance between New Footing and Existing Building Footing expressed in Fraction of the New Footing Depth, D  1D ½D 0 Reduction Factor To Allowable Soils Bearing Capacity a 1.0 0.75 0.5 a. Interpolation may be used for deriving reduction factor for other distance value. c) Lateral Resistance: Resistance to lateral loads can be assumed to be provided by passive lateral earth pressure and by friction acting on structural components in permanent contact with the subgrade soils. For site preparation implemented as per recommended in the above Section 5.2, lateral resistance on the sides of foundations may be computed using a passive lateral earth pressure of 200 pcf EFP for footings embedded into approved compacted fill soils, subject to a maximum of 2,000 psf. An ultimate coefficient of friction on the order of 0.35 may also be used for structural dead load acting between the footing bottom and the supporting soils, regardless of the lateral distance between new footing and existing building footing. The above passive lateral earth pressure may be used in conjunction with the ultimate coefficient of friction in calculating composite lateral resistance, provided the passive lateral earth pressure value is reduced by one-third (1/3). The composite lateral resistance may be increased by one-third (1/3) under short term, transient wind or seismic loading. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 19 For any new footing that is within a lateral distance from any existing building footing equal to two (2) times the depth of the new footing (D), the following tabulated reduction factors should be applied to the corresponding passive lateral earth pressure values for the sides of the new footing that are facing the existing building footing. Lateral Distance between New Footing and Existing Building Footing expressed in Fraction of the New Footing Depth, D  2D 1D 0 Reduction Factor To Passive Lateral Earth Pressure a 1.0 0.5 0 a. Interpolation may be used for deriving reduction factor for other distance value. The above passive lateral earth pressure may be used in conjunction with the ultimate coefficient of friction in calculating composite lateral resistance, provided the passive lateral earth pressure value is reduced by one-third (1/3). The composite lateral resistance may be increased by one-third (1/3) under short term, transient wind or seismic loading. d) Static Settlements: Total static settlements resulting from compression of subgrade soils for conventional footings designed and constructed in accordance with the criteria discussed in preceding Sections 5.3.2.a), b), and c) and supporting maximum assumed dead plus live (D+L) column and wall loads mentioned in Section 1.1.2 above, are not anticipated to exceed 1/2 inch, upon implementation of site preparation as per recommended in Section 5.2 above. A differential settlement/heaves on the order of 1/4 inch over a distance of 30 feet is anticipated between similarly loaded adjacent isolated pad footings, between isolated pad footings and continuous wall footings, and for continuous wall footings over a distance of approximately 30 feet. Please be reminded that the Geotechnical Consultant should be contracted for further evaluation and recommendations, as necessary, should final design structural loads exceed the maximum loads assumed in the above analyses by more than ten (10) percent. 5.3.2 Retaining Walls: Cantilevered retaining walls should be designed for an “active” lateral earth pressure value tabulated on the next page for approved granular backfill soils or site soils and level backfill conditions, whereas an “At-rest” lateral earth pressure value for approved granular backfill or site soils and level backfill conditions tabulated on the next page should be used for top-restrained retaining walls. Retaining walls subject to uniform surcharge loads should be designed for an additional uniform lateral pressure equal to one-third (1/3) and one-half (1/2) of the anticipated surcharge pressure over the full retained height of the retaining wall (measuring from the top of wall to the heel of wall footing) for cantilevered and top-restrained wall fixity conditions, ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 20 respectively, as shown in Figure 5, Nearby Building Surcharge Consideration and Retaining Wall Drainage Details. Any retaining wall with a retained height exceeding six (6) feet should additionally be designed to resist seismic lateral earth pressure. The Geotechnical Consultant should be consulted if this condition exists, or if the local governing agency requires the retaining wall to be designed for seismic lateral earth pressure regardless of the retained height. Footings should be reinforced as recommended to by Structural Consultant. Appropriate back drainage should be provided to avoid excessive build-up of hydrostatic wall pressures. Retaining Wall Design Parameter Value Allowable Soils Bearing Capacity 2,000 psf (1)(2) Active Pressure [site soils backfill: level] 40 pcf EFP (3) At-rest Pressure [site soils backfill: level] 60 pcf EFP (3) Passive Pressure (per foot of depth) 200 pcf EFP, subject to a ceiling value of 2,000 psf(4) Coefficient of Friction 0.35 (4) Minimum Footing Depth 18 inches Minimum Footing Width 15 inches Minimum Reinforcement Four No. 4 rebar - 2 near top and 2 near bottom (1) Based on compliance with earthwork recommendations per Section 5.2 of this Soils Report. (2) Allowable soils bearing capacity increase for larger retaining wall footings should be as per Section 5.3.2 b). (3) Design values assuming a drained condition with “Very Low” to “Low” expansive materials (EI ≤ 35) within the backfill zone and no surcharge loading conditions. (4) Passive lateral resistance may be combined with frictional resistance provided the passive lateral earth pressure is reduced by 1/3. See Section 5.3.1c. The Geotechnical Consultant should be on-site during temporary back cut and retaining wall construction to inspect and evaluate the stability of cuts and, if necessary, to provide additional remedial or mitigative recommendations. Preferably, the backfill should consist of approved “Very Low” expansive material (i.e. EI ≤ 20) and should be compacted to a minimum relative compaction of 90 percent. The width of the “Very Low” expansive backfill zone should be a minimum of one (1) foot measured from the rear side of the stem of the retaining wall, or the space between the rear side of the stem and the heel of the retaining wall, or one-half (1/2) of the retained height of the retaining wall, whichever is greater. Flooding or jetting of backfill should not be permitted. Granular backfill should be capped with 18 inches (minimum) of relatively impervious fill to seal the backfill and prevent saturation. Figure 5 illustrates the general configuration and requirements for retaining wall drainage. Should any conflict noticed between recommendations stated in this report and those shown in Figure 5, the fore should govern. Other retaining wall drainage alternatives such as CONTECH C-Drain or Wall waterproofing per Architect's specifications Compacted, cohesive soil backfill, compacted to min. 90% relative compaction per approved by the Geotechnical Consultant* Filter fabric envelope (Mirafi Retaining wall per structural plan 140N or approved equivalent) ** "Very Low" expansive soil (EI < 20) backfill, compacted to min. 90% relative compaction Native Soils (slope per approved by the Geotechnical Consultant*gradient for back cut to follow that of 4" (min.) diameter perforated PVC pipe temporary excavation (Schedule 40, SDR 35 or equivalent) with stipulated in the Soils perforations oriented down as depicted. Report) Min. 1% gradient to suitable outlet. Finish grade 3/4" ~ 1-1/2" clean gravel** Retaining Wall Footing 3" min. Competent bedrock, native soils or certified compacted fill per approved by the Geotechnical Consultant * Based on ASTM D-1557-12 ** If Caltrans Class II permeable material (see gradation to left) is used in place of 3/4" ~ 1-1/2" gravel, filter fabric may be deleted. Caltrans Class 2 permeable material 1"100 should be compacted to minimum 90 percent relative 3/4"90 ~ 100 compaction. Unless otherwise specified, a minimum of 3/8"40 ~ 100 1 cubic foot of gravel should be used for each 1 foot run No. 4 25 ~ 40 of drain. No. 8 18 ~ 33 Note 1: Composite drainage products such as Contech C-Drain, No. 30 5 ~ 15 Miradrain or J-Drain may be used as alternative to No. 50 0 ~ 7 gravel or Class II. Installation should be performed No. 200 0 ~ 3 in accordance with manufacturer's specifications. Project: Proj. No.:7160.23 Date:January, 2024 2860 Walnut Avenue Figure 5 Nearby Building Surcharge Consideration & Retaining Wall Drainage DetailsSignal Hill, CA 90755 Tel (562) 426-7990 Fax (562) 426-1842 Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA SPECIFICATIONS FOR CALTRANS CLASS II PERMEABLE MATERIAL U.S. STANDARD SIEVE SIZE % PASSING Sand Equivalent > 75 Associated Soils Engineering, Inc. 6" min. overlap 1' min. Compacted Fill 1' m i n . 18" min. Width of very low expansive backfill zone per the Soils Report & Note 2. 1 1 Limit of area where 1/3 and 1/2 of the loading from nearby buildings/structural features should be accounted for in cantilevered and top-restrained retaining wall design, respectively. Schematic Not To Scale Note 2: Width of " Very Low" expansion backfill equals 1/2 of retained height, or distance from back of wall to heel of footing, whichever is greater. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 21 MIRADRAIN may be considered but should first be reviewed and approved by the Geotechnical Consultant prior to implementation. Should the space behind the new retaining wall be too tight to implement the above recommended backfill effort, as an alternative, 2-sack control density fill (slurry fill) may be used in lieu of regular soil backfill, provided that the integrity and functionality of wall backdrain is protected and maintained. It should be noted that the use of heavy compaction equipment in close proximity to retaining structures can result in wall pressures exceeding design values and corresponding wall movement greater than that normally associated with the development of active or at-rest conditions. In this regard, the contractor should take appropriate precautions during the backfill placement. 5.3.3 Footing/Foundation Observation: All footing/foundation excavations should be observed by the Geotechnical Consultant's representative to verify minimum embedment depths and competency of bearing soils. Such observations should be made prior to placement of any reinforcing steel or concrete. 5.4 Slabs-On-Grade For structural design of concrete slabs, a modulus of subgrade reaction ("k-value") on the order of 100 pounds per square inch per inch ("psi/in") and an allowable bearing capacity of 850 psf may be used for slab constructed on recompacted site soils. Interior and exterior slabs should be properly designed and reinforced for the construction and service loading conditions. To minimize static slab distress, geotechnically, it would be prudent to provide minimum actual slab thickness of four (4) inches with minimum reinforcements consisting of number 4 reinforcing bars spaced maximum 12 inches on centers each way, placed at mid-slab, for exterior slabs and Building interior slab-on-grade, when supported by compacted fill. The final structural details, such as slab thickness, concrete strength, amount and type of reinforcements, joint spacing, etc., should be established by the Structural Consultant in accordance with pertinent sections in 2022 CBC. The entirety of any new slabs within the Building should be underlain by an impermeable vapor barrier (minimum 15-mil-thick visqueen). A minimum 12-inch overlap between visqueen sheets should be ensured during placement. All visqueen sheets should be puncture free prior to slab construction, and should be sandwiched top and bottom by two (2) inches of clean sand (Sand Equivalent (SE) ≥ 30 per ASTM D2419-22 Test Method). Alternatively, as per stipulations in Section 5.2.3.2 of ACI 302.1R-15, for slabs in moisture- sensitive areas, the concrete slabs should be poured directly on a moisture barrier consisting of 15-mil Stego Wrap Vapor Barrier/Retarder that is in turn underlain by 4” of ½” to 3/8” open graded gravel or crushed rock complying with the criteria stipulated in Section 200-1.2 of the current Greenbook. The concrete slab shall consist of a concrete mix design which will address bleeding, shrinking and curling. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 22 The slab subgrade soils should also be proof-rolled just prior to construction to provide a firm, unyielding surface, especially if the subgrade has been disturbed or loosened by the passage of construction traffic. Final compaction and testing of slab subgrade should be performed just prior to placement of concrete. Exterior slabs should be properly jointed to limit the number of concrete shrinkage cracks. For long/thin sections, such as sidewalks, expansion or control joints should be provided at spacing intervals equal to the width of the section. Slabs between 5 and 10 feet in minimum dimension should have a control joint at centerline. Slabs greater than 10 feet in minimum dimension should have joints such that unjointed sections do not exceed 10 feet in maximum dimension. Where flatwork adjoins structures, it is recommended that a foam joint or similar expansion material be utilized. Joint depth and spacing should conform to the ACI recommendations. It is, however, cautioned that uneven heaving of exterior slabs may develop in the future when prolonged irrigation or seepage permeates the subgrade soil, especially in areas that expansive soil pockets exist due to inadequate control or inspection of earthwork construction. 5.5 Asphaltic Concrete (AC) Flexural Pavement Design The finish subgrade within the new pavement areas on Site is anticipated to be underlain by compacted structural fill as per stipulated in Section 5.2.3b) above. For preliminary pavement design purposes, a conservative R-Value of 25 has been utilized considering the observed heterogenic silty sand and sandy silt site soils. The AC pavement analyses were performed based on procedures stipulated in the current edition of the Caltrans Highway Design Manual. By assuming compliance with site preparation recommendations aforementioned in Sections 5.1.1 through 5.2.6, ASE recommends that the following AC pavement structural sections be considered. However, local government authority should be consulted for minimum pavement section requirements and, if more stringent than that recommended by ASE, be complied with. (1) Asphaltic Concrete (2) CAB per the Greenbook Section 200-2.2, compacted at least 95% relative compaction (3) Upper 6 inches of subgrade soils to be compacted to a minimum 95% relative compaction It is recommended that R-Value testing be performed on representative soil samples after subgrade preparation on the upper 2 feet to confirm/modify applicability of the above pavement sections. Traffic Index (TI) Pavement Section Alternatives Remark AC (1) (inches) AB (2) (inches) Full Depth AC (3) (inches) 4.5 3.0 5.0 5.5 For auto parking stalls. 5.5 3.0 8.5 7.0 For auto circulation aisles. 4.0 6.0 7.0 4.0 11.0 9.5 For fire lanes and truck access ways/entry and exits. 5.0 9.0 ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 23 The aggregate base should conform to the Crushed Aggregate Base (CAB) or Crushed Miscellaneous Base (CMB) requirements per Sections 200-2.2 and 200-2.4 of the Greenbook, respectively. The base course should be compacted to a minimum relative compaction of 95% at a minimum of one (1) percentage point above the optimum moisture content. Field testing should be used to verify compaction, aggregate gradation, and compacted thickness. The AC pavement should be compacted to 95% of the unit weight as tested in accordance with the Hveem procedure per the latest CTM 304 procedures. The AC material shall conform to Type III, Class C2 or C3, of the Greenbook. All subgrade and aggregate base materials should be proof-rolled by heavy rubber tire equipment to verify that the subgrade and base grade are in a firm and non-yielding condition. All AC laydown operations should be performed under the observation of and testing by the Geotechnical Consultant’s field representative. An adequate number of field density tests should be taken to ensure compliance with this report and local ordinances. New AC should be examined by a representative of the Geotechnical Consultant, and tested as necessary to ensure that they meet the recommended quality specifications prior to being hauled to the site. Final acceptance of any AB material or AC will be based upon review and testing of the material actually delivered to the site. AC delivered to the site should be tested as necessary for quality assurance and relative compaction determination during laydown. If the paved areas are to be used during construction, or if the type and frequency of traffic is greater than assumed in the design, the pavement section should be re-evaluated for the anticipated traffic. 5.6 Portland Cement Concrete (PCC) Pavements The PCC pavement sections tabulated below are based on load safety factors of 1.0 and 1.1, and a modulus of subgrade reaction ("k" Value) of 100 pounds per cubic inch for site soils compacted as subgrade material, and the design procedures presented in the Portland Cement Association bulletin "Thickness Design for Concrete Highway and Street Pavements" (EB109.01P), 1984. A design service life of 20 years was assumed for the design of the Portland cement concrete pavement section. Concrete Flexural Strength (psi) (1) Pavement Thickness (in) (2), (4) Pavement Thickness (in) (3), (4) 600 6.0 7.0 650 5.5 6.5 (1) Represents 90-day flexural strength. Based on Figure 10 of Reference 5, concrete with 28-day unconfined compressive strength values of 4000 to 4500 psi typically correlates to 90-day flexural strength values of 600 and 650 psi, respectively. (2) Load Safety Factor = 1.0 (Auto Parking Stalls) (3) Load Safety Factor = 1.1 (Fire Lanes/Truck Traffic Areas/Entry and Exits) (4) Assumes no PCC shoulder or curb. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 24 The Structural Consultant should establish the design details of the concrete pavement section, including reinforcements, concrete strength, and joint and load transfer requirements. It is recommended that edges of concrete pavements which are not adjacent to existing buildings, or are adjacent to planter areas, be downturned a minimum of 12 inches or be constructed with curbing to prevent water infiltration to subgrade soils. If edges are downturned or curbing is constructed, the above pavement thicknesses should be decreased by 1/2 inch. The upper one (1) foot of exposed subgrade soils beneath concrete pavements should be further compacted to a minimum 95 percent relative compaction with a minimum moisture content of two (2) percentage points above optimum moisture content. Subgrade soils should exhibit a firm, unyielding surface in addition to the recommended compaction. Final compaction and testing of pavement subgrade should be performed just prior to placement of aggregate base and/or concreting. Other pertinent subgrade preparation measures stipulated in the "Thickness Design for Concrete Highway and Street Pavements" (EB109.01P), 1984, or required by the jurisdictional municipal authorities should be followed accordingly. 5.7 Site Drainage Per Section 1804.4 of 2022 CBC, a minimum 5% descending gradient away from the Building for a minimum distance of 10 feet should be incorporated for earth grade placed adjacent to the foundation. This descending gradient may be reduced to 2% for any impervious areas, such as concrete paved walkways, within the 10-foot zone. For areas where the 10-foot drainage distance is not attainable, alternative measure such as concrete-lined swales having a minimum 2% gradient may be adopted to divert the water away from the Building, provided that the minimum 5% gradient is maintained in the distance between the building footprint and the diversion measure such as swales. For more specific site drainage guidelines, the Civil Consultant should refer to the pertinent sections in 2022 CBC. Any planter areas to be placed adjacent to structure perimeters should be provided with impervious bottoms and a drainage pipe, or should be planted with drought tolerant plants, to divert water away or minimize moisture infiltration from foundation and slab subgrade soils. Excessive moisture variations in site soils could result in significant volume changes and movement. 5.8 Soil Corrosivity Evaluation Soils corrosivity tests were performed on a representative sample of site soil. These tests were meant to determine the corrosive potential of on-site soils to proposed concrete foundations/flatwork and underground metal conduits. The soils corrosivity test results are presented in Appendix A. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 25 5.8.1 Concrete Corrosion: Disintegration of concrete may be attributed to the chemical reaction of soils sulfates and hydrated lime and calcium aluminate with the cement. The severity of the reaction resulting in expansion and disruption of the cement is primarily a function of the concentration of soluble sulfates and the water-cement ratio of the concrete. A soluble sulfate content of 0.002% by weight has been recorded from testing per California Test Method (CTM) 417 conducted on on-site soils, as indicated in Appendix A. As per Table 19.3.1.1 of ACI 318-19, soils exhibiting soluble content less than 0.1% by weight are classified as having “S0” sulfate exposure category. As such, for structural features to be in direct contact with on-site soils, the special geotechnical requirements on the type of Portland cement or water cement ratio corresponding to the tested “S0” sulfate exposure category as per stipulated in Table 19.3.2.1 of ACI 318-19 should be considered. 5.8.2 Metal Corrosion: In the evaluation of soil corrosivity to metal, the hydrogen ion concentrates (pH) and the electrical resistivity of the site and backfill soils are the principal variables in determining the service life of ferrous metal conduit. The pH of soil and water is a measure of acidity or alkalinity, while the resistivity is a measure of the soils resistance to the flow of electrical current. Currently available design charts indicate that corrosion rates decrease with increasing resistivities and increasing alkalinities. It can also be noted that for alkaline soils, the corrosion rate is more influenced by resistivity than by pH. The resistivity value of 1,953 ohm-cm per ASTM G187-23 Test Method coupled with a pH-value of 8.22 per CTM 643 classifies the on-site soils tested to be “Corrosive” to buried ferrous metals. Based on CTM 643, the year to perforation for 18-gauge steel in contact with soils of similar resistivity and pH-value is approximately 32 years for the “Corrosive” on-site soils. In lieu of additional testing, alternative piping materials, i.e. plastic piping, may be used instead of metal if longer service life is desired or required for utility pipes and fittings in direct contact with on-site soils. These resistivity values of on-site soils may also have implications to other building materials and depths of embedment for steel reinforcement, etc. It is recommended that a qualified corrosion consultant be engaged to review the building plans. A soluble chloride content of 14 ppm was recorded in our laboratory tests per CTM 422. Per Caltrans guidelines and specifications (References 21 and 22), soils exhibiting soluble chloride contents exceeding 500 ppm are considered “corrosive”. The soils are thus classified as “non- corrosive” per Caltrans criterion. In addition, special measure in terms of rebar protection against ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 26 chloride corrosion under Exposure Class “C0” stipulated in Tables 19.3.1.1 and 19.3.2.1 of ACI 318- 19 may be required as a result of the soluble chloride content tested. However, the compliance with the corrosivity criteria stipulated in Section 5.2.8 above will ensure that no other particular reinforcement protection. 5.9 Utility Trenches All trenches should be backfilled with approved fill material compacted to relative compaction of not less than 90 percent. Care should be taken during backfilling to prevent utility line damage. The on-site soils may be used for backfilling utility trenches from one (1) foot above the top of pipe to the surface, provided the material is free of organic matter and deleterious substances. Any soft and/or loose materials or fill encountered at pipe invert should be removed and replaced with properly compacted fill or adequate bedding material. The on-site soils may be considered suitable for bedding or shading of utilities. Site or imported soils for pipe bedding should consist of non-expansive granular soils. Bedding materials should consist of sand with a tested Sand Equivalent, SE, value (ASTM D 2419-22 Test Method) not less than 30. If sandy soils are used for trench backfill, the backfill should be topped with a minimum 2-foot thick cap of compacted fine-grained, cohesive soil. Also, a minimum 10-foot length of trench at the entrance and exit points of structures should be backfilled with fine-grained soils to serve as a plug to prevent water migration into structure foundation support zones. The walls of temporary construction trenches may not be stable when excavated nearly vertical due to potential for caving. Shoring of excavation walls or flattening of slopes will be required if excavation depths greater than 4 feet are necessary. Trenches should be located so as not to impair the bearing capacity of soils or cause settlement under foundations. As a guide, trenches parallel to foundations should be clear of a 45-degree plane extending outward and downward from the edge of the foundations. All work associated with trenches, excavations and shoring must conform to the State of California Safety Code (CAL-OSHA). 5.10 Plan Review, Observations and Testing Once foundation and grading plans are completed, they should be forwarded to the Geotechnical Consultant for review of conformance with the intent of these recommendations and criteria presented in the pertinent sections of this report. All excavations should be observed by a representative of this office to verify minimum embedment depths, competency of bearing soils and that the excavations are free of loose and disturbed materials. Such observations should be made prior to placement of any fill, reinforcing steel or concrete. All grading ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 27 and fill compaction should be performed under the observation of and testing by a Geotechnical Consultant or his representative. 6.0 FIELD PERCOLATION TEST DATA Initial seepage rates obtained during the "Reading Time Interval Test" in Borings B-P1 and B-P2 after overnight pre-soaking indicated the time interval between readings should be 10 minutes maximum, i.e. the “Sandy Soil” category. The percolation tests were therefore performed using the sandy soil method (i.e. one hour test maximum) for Borings B-P1 and B-P2, in accordance with the State of California Regional Water Quality Board Technical Guidance Document Appendices (Appendix VII) procedures modified to test the cross sectional zone of typical soils within the level of anticipated storm water infiltration (e.g. approximately 5 feet to 10 feet and 1 foot to 5 feet below existing grade for Borings B-P1 and B-P2, respectively). Field percolation testing was conducted on December 2, 2023. Stabilized field percolation test data indicates preadjusted percolation test rates ranging from 0.690 to 5.714 minutes per inch (mpi) for clean water at the locations of Borings B-P2 and B-P1, respectively. Field percolation test data is presented on the attached Plates H-1 and H-2 in Appendix A. Tabulated below are the results of percolation testing conducted at the locations of Boring B-P1 and B-P2, including the infiltration rate derived from the Porchet Method of Percolation Rate Conversion procedures outlined in Appendix VII of the Technical Guidelines Document Appendices. Boring No. Test Depth (ft) Percolation Test Rate (Minutes/Inch) Infiltration Rate* (Inches/Hour) B-P1 5-10 0.690 0.570 B-P2 1-5 5.714 5.559 *Infiltration Rate derived from Porchet Method Conversion from Percolation Rate using a Factor of Safety of 3. The rates presented on the previous page are anticipated to be the fastest rates that can be absorbed by the site soils at the boring locations. However, with time and depending on the degree of saturation of soils and other factors, the percolation rate may reduce which is typical for sewage disposal or stormwater dispersal fields. Per Appendix VII, the results of the field percolation testing (i.e. measured infiltration rate greater than 0.3 inch per hour) indicate that site soils only at Boring B-P1 location are deemed suitable for the planning and installation of an on-site stormwater LID system within the approximate upper five to ten (5-10) feet from existing grade. Please be informed that during installation of on-site stormwater dispersal system, the following factors should be noted: • The degree of compactive effort in the upper 1 to 1.5 feet of soils above any filter material should be between 90 and 92 percent relative compaction. As any greater compactive efforts in the soil strata ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 28 of water retention system construction may cause the percolation rates to reduce substantially, it is not advisable to impose significant structural loading in these areas, from a geotechnical viewpoint. • The rate of water transmission from the filter material to the soil will be limited the porosity characteristics of the fabric wrap around the filter material. 7.0 CLOSURE This report has been prepared for the exclusive use of the LOC Architects (the Client) and their design consultants for use in the design and construction of the proposed community hub building. The report has not been prepared for use by other parties and may not contain sufficient information for purposes of other parties. The Client or its representatives are responsible for ensuring the information and recommendations contained in this report are brought to the attention of the project engineers and architects, incorporated into the project plans, and implemented by project contractors. This report should be reflected on project grading plans as a part of the project specifications. We request and recommend notification should any of the following occur: 1. Final plans for site development indicate utilization of areas not originally proposed for construction. 2. Structural loading conditions vary from those utilized for evaluation and preparation of this report. 3. The Site is not developed within 12 months following the date of this report. If changes or delays do occur, this office should be notified and provided with finalized plans of site development for our review to enable us to provide the necessary recommendations for additional work and/or updating of the report. Any charges for such review and necessary recommendations would be at the prevailing rate at the time of performing review work. The findings contained in this report are based upon our evaluation and interpretation of the information obtained from the limited number of test borings and the results of laboratory testing and engineering analysis. As part of the engineering analysis, it has been assumed and is expected that the geotechnical conditions existing across the area of study are similar to those encountered in the test excavations. However, no warranty is expressed or implied as to the conditions at locations or depths other than those excavated. Should conditions encountered during construction differ significantly from those described in this report, this office should be contacted immediately for recommendations prior to continuation of work. Our findings and recommendations were obtained in accordance with generally accepted current professional principles and local practice in geotechnical engineering and reflect our best professional judgment. We make no other warranty, either express or implied. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 29 These recommendations are, however, dependent on the aforementioned assumption of uniformity and upon proper quality control of engineered fill and foundations. Geotechnical observations and testing should be provided on a continuous basis during grading at the site to confirm preliminary design assumptions and to verify conformance with the intent of our recommendations. If parties other than Associated Soil Engineering, Inc. are engaged to provide geotechnical services during construction, they must be informed that they will be required to assume complete responsibility for the geotechnical phase of the project by either concurring with the recommendations in this report or providing alternative recommendations. This concludes our scope of services as indicated in our proposal dated March 17, 2023, however, our report is subject to review by the controlling authorities for the project. Any further geotechnical services that may be required of our office to respond to questions/comments of the controlling authorities after their review of the report will be performed on a time-and-expense basis as per our current fee schedule. We would not proceed with any response to report review comments/questions without authorization from your office. We at ASE appreciate your business and are prepared to assist you with construction- related services. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 30 APPENDIX A The following Appendices contain the substantiating data and laboratory test results to complement the engineering evaluations and recommendations contained in the report. Site Exploration On December 1, 2023, field explorations were performed by drilling two (2) test and two (2) percolation borings at the approximate locations indicated on the attached Boring and Percolation Test Location Plan, Plate A. The exploratory borings were drilled by Alroy Drilling Services utilizing a truck mounted CME75, rotary drilling rig equipped with 8-inch diameter continuous flight, hollow-stem rotary augers. The borings extended to depths ranging from 5 feet 1 inches to 26 feet from the existing grades. Continuous observations of the materials encountered in the borings were recorded in the field. The soils were classified in the field by visual and textural examination and these classifications were supplemented by obtaining bulk soil samples for future examination in the laboratory. Relatively undisturbed samples of soils were extracted in a Modified California barrel sampler lined with 2.416-inch diameter by one-inch high rings and tipped with tapered cutting shoe. All samples were secured in moisture-resistant bags immediately after retrieval from exploratory boring to minimize the loss of field moisture, followed by timely transportation to ASE’s laboratory for ensuing testing. Upon completion of exploration, the borings were backfilled with excavated materials and compacted by tamping. Description of the soils encountered, depth of samples, field density and moisture content of tested samples, respective laboratory tests performed, as well as Modified California barrel sampler blow counts are presented in the attached Field Logs of Borings / Field Logs of Percolation Boring ("B" Plates). The subsurface soils descriptions presented in the Field Logs of Boring / Field Logs of Percolation Boring have been interpreted from conditions exposed during the field investigation and/or information inferred from the reviewed geologic literature. As such, it is likely that not all of the subsurface conditions at the Site could be captured or represented. It is therefore essential that the Geotechnical Consultant’s engineer or geologist be on site during grading and foundation construction such that information/recommendations deciphered during preliminary geotechnical investigation phase could be verified and, if necessary, amended as appropriate. Plate A Boring Location Plan Plates B-1 and B-2 Field Logs of Boring Plates B-P1 and B-P2 Field Logs of Percolation Boring NO T T O S C A L E D a t e : Ja n u a r y , 2 0 2 4 As s o c i a t e d S o i l s E n g i n e e r i n g , I n c . Bo r i n g a n d P e r c o l a t i o n Te s t L o c a t i o n P l a n Pr o j e c t N a m e : Pr o p o s e d C o m m u n i t y H u b B u i l d i n g 18 0 1 E . C h e s t n u t A v . , S a n t a A n a , C A 28 6 0 W a l n u t A v e n u e Si g n a l H i l l , C A 9 0 7 5 5 Pl a t e A P r o j . N o . : 71 6 0 . 2 3 Te l ( 5 6 2 ) 4 2 6 - 7 9 9 0 F a x ( 5 6 2 ) 4 2 6 - 1 8 4 2 N B-1 26 ' De s i g n a t e d b o r i n g n u m b e r Ap p r o x i m a t e b o r i n g l o c a t i o n Te r m i n a l d e p t h o f b o r i n g LE G E N D B-1 26 ' B-2 25 ' 1 1 " Ap p r o x i m a t e S i t e l i m i t s B-P1 9' 8 " B-P2 5' 1 " Project: Location:7160.23 SM MAX DENSITY, REMOLD SHEAR, EXPANSION, CORROSIVITY 41 (Ring)SM-ML 107.8 11.5 SHEAR 82 (Ring)same as above 112.1 4.2 SHEAR 80 (Ring)SM 102.0 7.2 61 (Ring)SM 110.5 2.5 88/11"(Ring)SM 112.6 8.5 FIELD LOG OF BORING B-1 Sheet 1 of 3 Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA Project No. Date(s) Drilled:12/1/2023 Logged By:Ted Riddell Drilled By:Alroy Drilling Services Total Depth:26 feet Surface Elevation:N/A Comments:Groundwater not encountered. Backfill not determined. Rig Make/Model:CME75 Hammer Type:Automatic Drilling Method:Hollow-Stem Auger Hammer Weight/Drop:140 Lb./±30In. DE P T H ( F T ) EL E V A T I O N (M S L ) SAMPLE INTERVALS US C S Hole Diameter:8 inches MO I S T U R E CO N T E N T ( % ) OT H E R T E S T S Bu l k Dr i v e TY P E " N " (B l o w s / f t . ) DR Y D E N S I T Y (p c f ) GEOTECHNICAL DESCRIPTION SILTY SAND: Medium brown, damp, dense, fine- grained sand 15 SILTY SAND TO SANDY SILT: Medium brown, damp, dense, very fine to fine-grained sand, sinkhole pores 7 3 5 10 SILTY SAND: Medium brown, damp, fine-grained sand SILTY SAND: Medium brown to yellowish brown, dry to damp, dense, fine to medium-grained sand, some pebbles SILTY SAND: Light medium brown, damp, dense, fine- grained sand 0 Project: Location:7160.23 50/5"(Ring)SM/GP 108.3 3.1 93/10"(Ring)SM 109.7 8.8 FIELD LOG OF BORING B-1 Sheet 2 of 3 Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA Project No. OT H E R T E S T S Bu l k Dr i v e TY P E " N " (B l o w s / f t . ) 20 DE P T H ( F T ) EL E V A T I O N (M S L ) SAMPLE INTERVALS US C S GEOTECHNICAL DESCRIPTION DR Y D E N S I T Y (p c f ) MO I S T U R E CO N T E N T ( % ) 35 25 30 SILTY SAND AND GRAVEL: Medium brown with gray gravel, dry to damp, dense, fine to medium-grained sand SILTY SAND: Light medium brown, damp, dense to very dense, fine-grained sand DRILLING NOTE: Bottom of hole at 26 feet. No groundwater encountered. Project: Location:7160.23 SM 43(Ring)SM 109.4 8.4 CONSOL 35(Ring)SM 107.1 9.3 33(Ring)SM 114.9 9.7 37/11"(Ring)SM 120.0 8.6 FIELD LOG OF BORING B-2 Sheet 1 of 2 Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA Project No. Date(s) Drilled:12/1/2023 Logged By:Ted Riddell Drilled By:Alroy Drilling Services Total Depth:25 feet 11 inches Rig Make/Model:CME75 Hammer Type:Automatic Drilling Method:Hollow-Stem Auger Hammer Weight/Drop:140 Lb./±30In. Hole Diameter:8 inches Surface Elevation:N/A Comments:Groundwater not encountered. Backfill not determined. 3 5 MO I S T U R E CO N T E N T ( % ) OT H E R T E S T S Bu l k Dr i v e TY P E " N " (B l o w s / f t . ) 0 DE P T H ( F T ) EL E V A T I O N (M S L ) SAMPLE INTERVALS US C S GEOTECHNICAL DESCRIPTION DR Y D E N S I T Y (p c f ) SILTY SAND: Medium brown, damp to moist, fine- grained sand SILTY SAND: Medium brown, dampto moist, medium dense to dense, fine to medium-grained sand SILTY SAND: Medium brown, moist, medium-dense, fine to medium-grained sand, some pebbles, trace clay SILTY SAND WITH CLAY: Medium brown, damp to moist, dense, fine-grained sand SILTY SAND: Medium brown, damp to moist, dense, very fine to fine-grained sand 15 7 10 Project: Location:7160.23 81/12"(Ring)SM 115.0 8.4 90/11"(Ring)SM 116.7 2.3 FIELD LOG OF BORING B-2 Sheet 2 of 2 Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA Project No. DE P T H ( F T ) EL E V A T I O N (M S L ) SAMPLE INTERVALS US C S GEOTECHNICAL DESCRIPTION MO I S T U R E CO N T E N T ( % ) OT H E R T E S T S Bu l k Dr i v e TY P E " N " (B l o w s / f t . ) DR Y D E N S I T Y (p c f ) SILTY SAND: Medium brown, Damp to moist, dense, fine-grained sand DRILLING NOTE: Bottom of hole at 25 feet 11 inches. No groundwater encountered. 30 35 25 20 SILTY SAND: Medium brown, damp to moist, dense, fine-grained sand, some clay Project: Location:7160.23 SM 45(Ring)SM 106.0 8.5 PERCOLATION 86(Ring)SM 112.3 5.4 10 15 NOTE: 10 feet (5' solid and 5' slotted) PVC pipe place in boring with annular area backfilled with pea gravel to surface. Two (2.0) inches of pea gravel placed at bottom of pipe. Percolation test performed after overnight presoaking. 3 5 7 SILTY SAND: Medium brown, damp, medium dense, fine-grained sand SILTY SAND: Medium brown, damp, fine-grained sand Comments:Groundwater not encountered. Backfill not determined. 0 DE P T H ( F T ) EL E V A T I O N (M S L ) SAMPLE INTERVALS US C S GEOTECHNICAL DESCRIPTION MO I S T U R E CO N T E N T ( % ) OT H E R T E S T S Bu l k Dr i v e TY P E " N " (B l o w s / f t . ) DR Y D E N S I T Y (p c f ) SILTY SAND: Medium-brown, damp, fine-grained sand Hole Diameter:8 inches Surface Elevation:N/A Drilling Method:Hollow-Stem Auger Hammer Weight/Drop:140 Lb./±30In. Rig Make/Model:CME75 Hammer Type:Automatic Drilled By:Alroy Drilling Services Total Depth:9 feet 8 inches Date(s) Drilled:12/1/2023 Logged By:Ted Riddell FIELD LOG OF PERCOLATION BORING B-P1 Sheet 1 of 1 Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA Project No. Project: Location:7160.23 SM PERCOLATION 30(Ring)same as above 93.1 19.0 FIELD LOG OF PERCOLATION BORING B-P2 Sheet 1 of 1 Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA Project No. Drilled By:Alroy Drilling Services Total Depth:5 feet 1 inch Date(s) Drilled:12/1/2023 Logged By:Ted Riddell Hole Diameter:8 inches Surface Elevation:N/A Drilling Method:Hollow-Stem Auger Hammer Weight/Drop:140 Lb./±30In. Rig Make/Model:CME75 Hammer Type:Automatic Comments:Groundwater not encountered. Backfill not determined. 0 DE P T H ( F T ) EL E V A T I O N (M S L ) SAMPLE INTERVALS US C S MO I S T U R E CO N T E N T ( % ) OT H E R T E S T S Bu l k Dr i v e TY P E " N " (B l o w s / f t . ) GEOTECHNICAL DESCRIPTION DR Y D E N S I T Y (p c f ) SILTY SAND: Medium brown, damp to moist, medium dense, fine-grained sand NOTE: 5 feet (5'0") slotted PVC pipe place in boring with annular area backfilled with pea gravel to surface. Two (2.0) inches of pea gravel placed at bottom of pipe. Percolation test performed after overnight presoaking. 15 3 5 10 ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 31 Laboratory Tests After samples were visually classified in the laboratory, a testing program aimed at generating sufficient data for subsequent evaluation was established and implemented. • Moisture Content and Density Tests The undisturbed soil retained within the rings of the Modified California barrel sampler was tested in the laboratory to determine in-place dry density and moisture content. Test results are presented on the Field Logs of Borings / Field Logs of Percolation Borings (see attached "B" Plates). • Consolidation and Direct Shear Tests Consolidation (ASTM D 2435-11(2020) Test Method) and direct shear (ASTM D3080-23 Test Method) tests were performed on selected relatively undisturbed and remolded samples to determine the settlement characteristics and shear strength parameters of various soil samples, respectively. The results of these tests are shown graphically on the appended “C” and “D” Plates. • Soil Corrosivity Tests of soluble sulfate and chloride contents were performed in accordance with the latest edition of California Test Methods 417 and 422, respectively, to assess the degree of corrosivity of the subgrade soils with regard to concrete and normal grade steel. Resistivity and pH-value tests were performed in accordance with the latest edition of ASTM G187-23 Test Method and California Test Method 643, respectively, to assess the degree of corrosivity of the subgrade soils with regard to ferrous metal piping. The test results are presented below. Sample ID Sulfate Content 1 (%)/ Exposure Category Chloride Content 2 (ppm) / Exposure Category Resistivity 3 (OHM-cm)/ Degree of Corrosivity Ph-Value3 B-1 @ 1’-5’ 0.002 / S0 14 / C0 1,953 / Corrosive 8.22 1. California Test Method 417 2. California Test Method 422 3. ASTM G187-23 Test Method 4. California Test Method 643 • Maximum Dry Density/Optimum Moisture Content Test A maximum density test was conducted in accordance with ASTM D1557-12(2021) Test Method, Method A, using 5 equal layers, 25 blows each layer, 10-pound hammer, 18 inch drop in a 1/30 cubic foot mold. The results are as follows: Sample ID Maximum Dry Density (pcf) Optimum Moisture Content (%) Material Classification B-1 @ 1’-5’ 126.0 10.5 SM-ML ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 32 Laboratory Tests – continued • Expansion Test An expansion test was performed on a soil sample to determine the swell characteristics. The expansion test was conducted in accordance with ASTM D4829-21 test procedures. The expansion sample was remolded to approximately 90 percent relative compaction at near optimum moisture content subjected to 144 pounds per square foot surcharge load and were saturated. Sample ID Molded Dry Density (pcf) Molded Moisture Content (%) % Saturation Expansion Index (EI) Expansion Classification B-1 @ 1’-5’ 108.9 9.6 49.0 31 Low Plates C-1 through C-3 Uni-axial Consolidation Test Results Plates D-1 through D-3 Direct Shear Test Results Plates H-1 and H-2 Percolation Data Sheet Sample Location B-2 @ 3'Dry Density (pcf)109.4 Moisture (%)8.4 Sample Type Ring Sample Description Remark Undisturbed sample Project: Plate C-1 Project No.:7160.23 Date: Silty Very Fine Sand Associated Soils Engineering, Inc.Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA 2860 Walnut Avenue Result of Uniaxial Consolidation/Swelling Test of On-Site Soil (ASTM D2435-11 Test Method)Signal Hill, CA 90755 Tel (562) 426-7990 Fax (562) 426-1842 January, 2024 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0.1 1 10 100 De f o r m a t i o n ( % ) Normal Pressure (ksf) Loading Unloading Tap Water Inundation Sample Location B-2 @ 7'Dry Density (pcf)107.1 Moisture (%)9.3 Sample Type Ring Sample Description Remark Undisturbed sample Project: Plate C-2 Project No.:7160.23 Date: Silty Sand Associated Soils Engineering, Inc.Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA 2860 Walnut Avenue Result of Uniaxial Consolidation/Swelling Test of On-Site Soil (ASTM D2435-11 Test Method)Signal Hill, CA 90755 Tel (562) 426-7990 Fax (562) 426-1842 January, 2024 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0.1 1 10 100 De f o r m a t i o n ( % ) Normal Pressure (ksf) Loading Unloading Tap Water Inundation Sample Location B-2 @ 10'Dry Density (pcf)114.9 Moisture (%)9.7 Sample Type Ring Sample Description Remark Undisturbed sample Project: Plate C-3 Project No.:7160.23 Date: Silty Sand, trace clay Associated Soils Engineering, Inc.Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA 2860 Walnut Avenue Result of Uniaxial Consolidation/Swelling Test of On-Site Soil (ASTM D2435-11 Test Method)Signal Hill, CA 90755 Tel (562) 426-7990 Fax (562) 426-1842 January, 2024 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 0.1 1 10 100 De f o r m a t i o n ( % ) Normal Pressure (ksf) Loading Unloading Tap Water Inundation Sample B-1 @ 3'Dry Density (pcf)107.8 Description Moisture Content (%)4.5 f-angle (degree)18.0 Cohesion (ksf)0.110 Project: Plate D-1 Project No.:7160.23 Date:January, 2024Tel (562) 426-7990 Fax (562) 426-1842 Silty Very Fine Sand to Sandy Silt Ultimate (Residual) Associated Soils Engineering, Inc.Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA 2860 Walnut Avenue Direct Shear Test Result (ASTM D 3080-11 Test Method)Signal Hill, CA 90755 0.0 0.5 1.0 1.5 2.0 2.5 0.0 0.5 1.0 1.5 2.0 2.5 Sh e a r S t r e s s ( k s f ) Normal Stress (ksf) Residual (Ultimate)Values Sample B-1 @ 5'Dry Density (pcf)112.1 Description Moisture Content (%)4.2 f-angle (degree)26.5 Cohesion (ksf)0.130 Project: Plate D-2 Project No.:7160.23 Date:January, 2024Tel (562) 426-7990 Fax (562) 426-1842 Silty Very Fine Sand to Sandy Silt Ultimate (Residual) Associated Soils Engineering, Inc.Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA 2860 Walnut Avenue Direct Shear Test Result (ASTM D 3080-11 Test Method)Signal Hill, CA 90755 0.0 0.5 1.0 1.5 2.0 2.5 0.0 0.5 1.0 1.5 2.0 2.5 Sh e a r S t r e s s ( k s f ) Normal Stress (ksf) Residual (Ultimate)Values Sample B-1 @ 0'-5'Dry Density (pcf)113.4 Description Moisture Content (%)10.5 f-angle (degree)37.5 Cohesion (ksf)0.040 Project: Plate D-3 Project No.:7160.23 Date:January, 2024Tel (562) 426-7990 Fax (562) 426-1842 Silty Fine Sand Ultimate (Residual) Associated Soils Engineering, Inc.Proposed Community Hub Building 1801 E. Chestnut Av., Santa Ana,CA 2860 Walnut Avenue Direct Shear Test Result (ASTM D 3080-11 Test Method)Signal Hill, CA 90755 0.0 0.5 1.0 1.5 2.0 2.5 0.0 0.5 1.0 1.5 2.0 2.5 Sh e a r S t r e s s ( k s f ) Normal Stress (ksf) Sample remolded to 90% relative compaction per ASTM D1557-12 Test Method Residual (Ultimate)Values ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 33 PERCOLATION DATA SHEET Project: On-Site Storm Water Dispersal Job No.: 7160.23 Proposed Community Hub Building 1801 East Chestnut Avenue, Santa Ana, CA Test Hole No.: B-P1 Date Excavated: 12/1/2023 Depth of Test Hole: 9' 8" Soil Classification: Silty Fine Sand Presoak: √ Percolation Tested By: JC Date: 12/2/2023 Note: 2.0” Gravel at Bottom of Pipe SANDY SOIL CRITERIA TEST Trial No. Time Time Interval (Min.) Initial Water Level (Inches) Final Water Level (Inches) ∆ In Water Level (Inches) 1 7:22 7:28 6 -9.0 -18.0 9.0 2 7:30 7:34 4 -9.0 -15.0 6.0 USE NORMAL SANDY (CROSS ONE) SOIL CRITERIA Time Time Interval (Min.) Total Elapsed Time (Min.) Initial Water Level (Inches) Final Water Level (Inches) ∆ In Water Level (Inches) Percolation Rate (Min./Inches) 7:36 7:46 10 10 -9 -23.0 14.0 0.714 7:47 7:57 10 20 -9 -24.0 15.0 0.667 7:58 8:08 10 30 -9 -27.0 18.0 0.556 8:09 8:19 10 40 -9 -24.0 15.0 0.667 8:20 8:30 10 50 -9 -21.25 12.25 0.816 8:31 8:41 10 60 -9 -23.5 14.5 0.690 8:42 8:52 10 10 -9 -23.0 14.0 0.714 PLATE H-1 ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 Page 34 PERCOLATION DATA SHEET Project: On-Site Storm Water Dispersal Job No.: 7160.23 Proposed Community Hub Building 1801 East Chestnut Avenue, Santa Ana, CA Test Hole No.: B-P2 Date Excavated: 12/1/2023 Depth of Test Hole: 5' 1" Soil Classification: Silty Sand Presoak: √ Percolation Tested By: JC Date: 12/2/2023 Note: 2.0” Gravel at Bottom of Pipe SANDY SOIL CRITERIA TEST Trial No. Time Time Interval (Min.) Initial Water Level (Inches) Final Water Level (Inches) ∆ In Water Level (Inches) 1 7:40 7:59 19 -4.0 -10.0 6.0 2 8:00 8:22 22 -4.0 -10.0 6.0 USE NORMAL SANDY (CROSS ONE) SOIL CRITERIA Time Time Interval (Min.) Total Elapsed Time (Min.) Initial Water Level (Inches) Final Water Level (Inches) ∆ In Water Level (Inches) Percolation Rate (Min./Inches) 8:28 8:38 10 10 -4.0 -6.5 2.5 4.000 8:39 8:49 10 20 -4.0 -6.25 2.25 4.444 8:50 9:00 10 30 -4.0 -5.75 1.75 5.714 9:01 9:11 10 40 -4.0 -5.5 1.5 6.667 9:12 9:22 10 50 -4.0 -5.5 1.5 6.667 9:23 9:33 10 60 -4.0 -5.75 1.75 5.714 PLATE H-2 ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 APPENDIX B - SITE FAULTING AND SEISMIC HAZARD DATA Plates I-1 and I-2 EQFAULT – Deterministic Estimation of Peak Acceleration from Digitized Faults within 100 km-radius from the Site ASE#7160.23 PLATE I-1 *********************** * * * E Q F A U L T * * * * Version 3.00 * * * *********************** DETERMINISTIC ESTIMATION OF PEAK ACCELERATION FROM DIGITIZED FAULTS JOB NUMBER: 7160.23 DATE: 01-23-2024 JOB NAME: Proposed Community Hub Building CALCULATION NAME: SantaAnaZoo FAULT-DATA-FILE NAME: C:\Program Files (x86)\EQFAULT1\CGSFLTE.DAT SITE COORDINATES: SITE LATITUDE: 33.7429 SITE LONGITUDE: 117.8417 SEARCH RADIUS: 62 mi ATTENUATION RELATION: 20) Sadigh et al. (1997) Horiz. - Soil UNCERTAINTY (M=Median, S=Sigma): M Number of Sigmas: 0.0 DISTANCE MEASURE: clodis SCOND: 0 Basement Depth: 5.00 km Campbell SSR: Campbell SHR: COMPUTE PEAK HORIZONTAL ACCELERATION FAULT-DATA FILE USED: C:\Program Files (x86)\EQFAULT1\CGSFLTE.DAT MINIMUM DEPTH VALUE (km): 0.0 ASE#7160.23 PLATE I-2 EQFAULT SUMMARY DETERMINISTIC SITE PARAMETERS ------------------------------------------------------------------------------- | |ESTIMATED MAX. EARTHQUAKE EVENT | APPROXIMATE |------------------------------- ABBREVIATED | DISTANCE | MAXIMUM | PEAK |EST. SITE FAULT NAME | mi (km) |EARTHQUAKE| SITE |INTENSITY | | MAG.(Mw) | ACCEL. g |MOD.MERC. ================================|==============|==========|==========|========= SAN JOAQUIN HILLS | 3.9( 6.3)| 6.6 | 0.457 | X NEWPORT-INGLEWOOD (L.A.Basin) | 9.6( 15.5)| 7.1 | 0.257 | IX NEWPORT-INGLEWOOD (Offshore) | 11.3( 18.2)| 7.1 | 0.230 | IX WHITTIER | 11.6( 18.7)| 6.8 | 0.197 | VIII PUENTE HILLS BLIND THRUST | 13.2( 21.2)| 7.1 | 0.264 | IX ELSINORE (GLEN IVY) | 14.0( 22.6)| 6.8 | 0.168 | VIII CHINO-CENTRAL AVE. (Elsinore) | 14.7( 23.6)| 6.7 | 0.197 | VIII SAN JOSE | 20.6( 33.1)| 6.4 | 0.114 | VII PALOS VERDES | 20.7( 33.3)| 7.3 | 0.155 | VIII SIERRA MADRE | 26.8( 43.2)| 7.2 | 0.145 | VIII UPPER ELYSIAN PARK BLIND THRUST | 27.0( 43.4)| 6.4 | 0.083 | VII CUCAMONGA | 27.2( 43.8)| 6.9 | 0.118 | VII ELSINORE (TEMECULA) | 29.2( 47.0)| 6.8 | 0.079 | VII RAYMOND | 30.0( 48.2)| 6.5 | 0.079 | VII CLAMSHELL-SAWPIT | 31.4( 50.5)| 6.5 | 0.075 | VII VERDUGO | 32.2( 51.9)| 6.9 | 0.097 | VII CORONADO BANK | 33.1( 53.3)| 7.6 | 0.116 | VII HOLLYWOOD | 34.2( 55.1)| 6.4 | 0.061 | VI SAN JACINTO-SAN BERNARDINO | 38.0( 61.2)| 6.7 | 0.053 | VI SAN JACINTO-SAN JACINTO VALLEY | 39.8( 64.0)| 6.9 | 0.058 | VI SANTA MONICA | 39.8( 64.1)| 6.6 | 0.059 | VI SAN ANDREAS - SB-Coach. M-1b-2 | 42.5( 68.4)| 7.7 | 0.094 | VII SAN ANDREAS - Whole M-1a | 42.5( 68.4)| 8.0 | 0.114 | VII SAN ANDREAS - SB-Coach. M-2b | 42.5( 68.4)| 7.7 | 0.094 | VII SAN ANDREAS - San Bernardino M-1| 42.5( 68.4)| 7.5 | 0.082 | VII SAN ANDREAS - 1857 Rupture M-2a | 42.6( 68.6)| 7.8 | 0.100 | VII SAN ANDREAS - Mojave M-1c-3 | 42.6( 68.6)| 7.4 | 0.077 | VII SAN ANDREAS - Cho-Moj M-1b-1 | 42.6( 68.6)| 7.8 | 0.100 | VII MALIBU COAST | 44.4( 71.5)| 6.7 | 0.055 | VI CLEGHORN | 44.9( 72.2)| 6.5 | 0.036 | V SIERRA MADRE (San Fernando) | 45.2( 72.7)| 6.7 | 0.054 | VI SAN GABRIEL | 47.0( 75.7)| 7.2 | 0.059 | VI NORTHRIDGE (E. Oak Ridge) | 48.1( 77.4)| 7.0 | 0.063 | VI ROSE CANYON | 49.2( 79.1)| 7.2 | 0.056 | VI NORTH FRONTAL FAULT ZONE (West) | 51.0( 82.1)| 7.2 | 0.068 | VI ANACAPA-DUME | 51.8( 83.3)| 7.5 | 0.083 | VII SAN JACINTO-ANZA | 53.1( 85.5)| 7.2 | 0.050 | VI ELSINORE (JULIAN) | 53.9( 86.8)| 7.1 | 0.046 | VI SANTA SUSANA | 55.0( 88.5)| 6.7 | 0.041 | V HOLSER | 60.7( 97.7)| 6.5 | 0.031 | V ******************************************************************************* -END OF SEARCH- 40 FAULTS FOUND WITHIN THE SPECIFIED SEARCH RADIUS. THE SAN JOAQUIN HILLS FAULT IS CLOSEST TO THE SITE. IT IS ABOUT 3.9 MILES (6.3 km) AWAY. LARGEST MAXIMUM-EARTHQUAKE SITE ACCELERATION: 0.4572 g ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 APPENDIX C - LIST OF REFERENCES 1. Blake, T.F., 2000, EQFAULT, A Computer Program for the Deterministic Predication of Peak Horizontal Acceleration from Digitized California Faults. 2. Guidelines for Evaluating and Mitigating Seismic Hazards in California, 2008, Special Publication 117A, California Geological Survey. 3. California Geological Survey, 2016, Seismic Hazard Zones Official Map, Santa Ana Quadrangle. 4. California Geological Survey, 1998, Seismic Hazard Zone Report 012, Seismic Hazard Zone Report for the Santa Ana 7.5-Minute Quadrangle, Orange County, California. 5. California Building Code, 2022 Edition: Sacramento, CA, California Building Standards Commission, 2 Volumes. 6. Legg, M.R., Borrero, J.C., and Synolakis, C.E., 2003, Evaluation of Tsunami Risk to Southern California Coastal Cities, The 2002 NEHRP Professional Fellowship Report, PF 2002-11, Earthquake Engineering Research Institute. 7. Soil Mechanics Design Manual 7.1 (NAVFAC DM-7.1), 1982, Department of the Navy, Naval Facilities Engineering Command, p. 347. 8. Foundation and Earth Structures Design Manual 7.2 (NAVFAC DM-7.2), 1982, Department of the Navy, Naval Facilities Engineering Command. 9. Stewart, J.P., Whang, D.H., Moyneur, M., and Duku, P., 2004, Seismic Compression of As-Compacted Fill Soils with Variable Level of Fines Content and Fines Plasticity, CUREE Publication No. EDA-05, 101p. 10. Tokimatsu, A.M. and Seed, H.B., 1987, Evaluation of Settlements in Sands Due to Earthquake Shaking, Journal of Geotechnical Engineering, ASCE, Vol. 113, No. 8, p. 861-878. 11. 2008 Interactive Deaggregations, Hazards Program, United States Geological Survey, website: http:/eqint.cr.usgs.gov/deaggint/2008/dndez.php. 12. Krinitzsky, Ellis L., Gould, James P. and Edinger, Peter H., 1993, Fundamentals of Earthquake Resistant Construction, John Wiley & Sons, Inc. 13. Minimum Design Loads for Buildings and Other Structures, 2016, American Society of Civil Engineers, ASCE Standard 7-16. 14. Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary, 2019, published by American Concrete Institute, Farmington Hill, MI, 623p. 15. Civil Engineering Pavements, Design Manual 5.4 (DM 5.4), 1979, Department of the Navy, Naval Facilities Engineering Command, 60 pp. 16. California Geological Survey, Revised 1994, Fault Rupture Hazard Zones in California, Special Publication 42. ASSOCIATED SOILS ENGINEERING, INC. Project No.: 7160.23 2860 Walnut Avenue, Signal Hill CA 90755 January 23, 2024 Tel: (562) 426 -7990 * Fax: (562) 426 -1842 APPENDIX C - LIST OF REFERENCES - continued 17. Federal Emergency Management Agency, 2009, National Flood Insurance Program, Flood Insurance Rate Map, Los Angeles County, California and Incorporated Areas, Map Number 06059C0277J, effective date December 3. 18. Youd, T.L., and Idriss, I.M., 2001, Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils, Journal of Geotechnical and Geo-Environmental Engineering, ASCE, Vol. 127, No. 4, p. 297-313. 19. Recommended Procedures for Implementation of DMG Special Publication 117: Guidelines for Analyzing and Mitigating Liquefaction in California, 1999, Southern California Earthquake Center, University of Southern California. 20. Seed, R.B., Cetin, K.O., Moss, R.E.S., Kammerer, A.M., Wu, J., Pestana, J.M., Riemer, M.F., Sancio, R.B., Kayen, R.E., and Faris, A., 2003, Recent Advances in Soils Liquefaction Engineering: A Unified and Consistent Framework, Keynote Presentation, 26th Annual ASCE Los Angeles Geotechnical Spring Seminar. 21. Corrosion Guidelines, Version 3.2, May 2021, Published by California Department of Transportation (Caltrans), 44p. 22. Bridge Design Specifications, September 2003, Published by California Department of Transportation (Caltrans). 23. Cetin, K.O., Youd, L.T., Seed, R.B., Bray, J.D., Stewart, J.P., Durgunoglu, T.H., Lettis, W., and Yilmaz, T.M., 2004, Liquefaction-induced Lateral Spreading at Izmit Bay During the Kocaeli (Izmit)-Turkey Earthquake, Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol. 130, No. 12, p. 1300-1313. 24. Settlement Analysis, 1994, Technical Engineering and Design Guides as adapted from the US Army Corps of Engineers, No. 9, published by American Society of Civil Engineers, New York, NY, p. 136. 25. Winterkorn, H.F., ad Fag, H.Y., 1976, Foundation Engineering Handbook: New York, NY, Van Nostrand Reinhold, 751p. 26. Cao, T., Bryant, W.A. Rowshandel, B., Branum, D., and Wills, C.J., 2003, the Revised 2002 California Probabilistic Seismic Hazard Maps, California Geological Survey. 27. Peterson, M.D., Bryant, W.A., Cramer, C.H., Cao, T., Reichle, M., Frankel, A.D., Lienkaemper, J.J., McCrory, P.A., and Schwartz, D.P., 1996, Probabilistic Seismic Hazard Assessment for the State of California, California Department of Conservation, Division of Mines and Geology, Open-File Report 96-706. 28. Wood, N.J., Ratliff, J., and Peters, J., Community Exposure to Tsunami Hazards in California, 2013, Scientific Investigations Report 2012-5222, published by U.S. Geological Survey. SANTA ANA ZOO COMMUNITY HUB BUILDINGS BC 1 STRUCTURAL CALCULATION KPFF JOB # 2300175 FEBRUARY 13, 2025 700 South Flower Street, Suite 2100 Los Angeles, CA 90017 213.418.0201 kpff.com REGISTERED PROFESS IONAL ENGINEERRAMZI S . HODAL I STRUC T URALSTATE OF CAL IFORNIA 700 South Flower StreetSuite 2100Los Angeles, CA 90027 project location client by date job no. sheet no.SAZ 2300175 SANTA ANA, CA LOC ARCHITECTS 02/13/2025 COMMENT #28 RESPONSE KPFF Consulting Engineers Project : 700 South Flower Street, Suite 2100 Job no. : Los Angeles, CA 90017 Date : (213) 418-0201 S4-1 (WEST)By : A. OVERVIEW B. ALLOWABLE STRESS DESIGN B.1 WALL GEOMETRY AND TYPE LENGTH, l =15.8 ft HEIGHT, h =15.0 ft OVT WALL LENGTH, l' = 14.9625 =0.95*L Overstrength Factor, Ω0 =3 Wall Aspect Ratio, H / l =1.0 USE: 1.0 B.2 LOAD INPUT LOAD TYPE DEAD (D)LIVE ROOF (Lr)SNOW (S) WIND (W) SEISMIC (E) F ---0 lb 6300 lb P1 902 lb 752 lb -0 lb 0 lb P2 1032 lb 860 lb ---Default Wall Weight =8 psf P3 0 lb 0 lb -0 lb 0 lbw188 lb/ft 74 lb/ft 0 lb/ft -- w2 0 lb/ft 0 lb/ft 0 lb/ft --Additional Finish Weight =13 psf B.3 WALL SHEATHING AND NAILING Fastener Size: Blocking Provided When Required? SEISMIC WIND Design Unit Shear =280 lb/ft 0 lb/ft Wall Unit Shear Capacity =340 lb/ft 475 lb/ft Wall Shear DCR =0.82 OK 0.00 OK B.4 BOUNDARY ELEMENT (B.E.) AND HOLDOWN B.4.1 BOUNDARY ELEMENT B.4.2 HOLDOWN B.E. Species:Holdown Type:SIMPSON - HDU2-SDS2.5 B.E. Size:Anchor Bolt Diameter:5/8 B.E. Grade:Min. Wood Member Thickness:3 Strong Direction Un-braced Length Weak Direction Un-braced Length City of Los Angeles Project?NO Design Holdown Tension = 2198 lb Holdown Capacity = 3075 lb B.E. Compression = 5323 lb Holdown DCR =0.71 OK B.E. Capacity = 9793 lb B.E. Compression DCR =0.54 OK B.5 SILL BOLT AND SILL PLATE B.5.1 SILL BOLT B.5.2 SILL PLATE Sill/Bottom Plate Thickness:2x Sill/Bottom Plate Thickness 2x Sill Bolt Diameter:5/8 Sill Bolt Spacing:16 in Design Post Compression = 5323 lb Sill Plate Bearing Capacity = 13320 lb Design Unit Shear = 280 lb/ft Sill Plate DCR =0.40 OK Sill Bolt Unit Shear Capacity = 1488 lb/bolt Wall Shear DCR =0.25 OK LIVE (L) UNFACTORED LOADS SAZ OK Non-Perforated Wood Shear Wall Minimum Nominal Panel Thickness (in.): Panel Edge Fastener Spacing (in.): Stud Spacing: 15/32 6 16 A.1. This spreadsheet is intended for determining the designed parameters for a Non-Perforated Wood Shear Wall per 2019 CBC Section 2305. Sheathing Material: 2019 CBC CHAPTER 23 (Section 2305) Wood Structural Panels - Structural 1 NO Douglas Fir-Larch 4x6 Select Structural 0.0 ft Sheathing on Both Wall Faces? BASIC LOAD COMBINATIONS (CBC 1605.3.1) 15.0 ft 10d YES 0 lb/ft 0 lb 0 lb 0 lb 0 lb/ft - KPFF Consulting Engineers Project : 700 South Flower Street, Suite 2100 Job no. : Los Angeles, CA 90017 Date : (213) 418-0201 S4-1 (WEST)By : SAZ C. LOADING C.1 LOAD INPUT DEAD (D)LIVE ROOF (Lr)SNOW (S) WIND (W) SEISMIC (E) F ---0 lb 6300 lb Default Wall Weight =8 psf P1 902 lb 752 lb -0 lb 0 lb P2 1032 lb 860 lb --- P3 0 lb 0 lb -0 lb 0 lb Additional Finish Weight =13 lb w1 88 lb/ft 74 lb/ft 0 lb/ft -- w2 0 lb/ft 0 lb/ft 0 lb/ft -- Load Combinations Considered 1) D+(0.6W or 0.7E)(EQ 16-12) 2) D+0.75(0.6W)+0.75L+0.75(Lr or S)(EQ 16-13) 3) D+0.75(0.7E)+0.75L+0.75S (EQ 16-14) 4) 0.6D+0.6W (EQ 16-15) 5) 0.6D+0.7E (EQ 16-16) DEAD (D)LIVE ROOF (Lr)SNOW (S) WIND (W) SEISMIC (E) F ---0 lb 4410 lb P1 541 lb 0 lb --- P2 619 lb 0 lb --- P3 0 lb 0 lb - - - w1 53 lb/ft 0 lb/ft 0 lb/ft -- w2 0 lb/ft 0 lb/ft 0 lb/ft -- C.2 DESIGN VALUES DESIGN VALUES Wall Unit Shear =280 lb/ft Sill Bolt Unit Shear =280 lb/ft Overturning Moment =66150 lb-ft Resisting Moment =55428 lb-ft Holdown Tension =2198 lb Overstrength Tension =6595 lb Post Compression =5323 lb 0 lb 0 lb 5) 0.6D+0.7E LOAD COMBO OF INTEREST: DESIGN VALUES FOR LOAD COMBO OF INTEREST : 5) 0.6D+0.7E 280 lb/ft 280 lb/ft 33257 lb/ft 2198 lb/ft 6595 lb/ft 66150 lb/ft 1) D+(0.6W or 0.7E) 1) D+(0.6W or 0.7E) 1) D+(0.6W or 0.7E) 5) 0.6D+0.7E 5) 0.6D+0.7E LOAD COMBO FOR DESIGN VALUE 1) D+(0.6W or 0.7E) 4962 lb/ft1) D+(0.6W or 0.7E) BASIC LOAD COMBINATIONS (CBC 1605.3.1) SERVICE LOADS LOAD TYPE LOAD TYPE FACTORED LOADS BASED ON SELECTED LOAD COMBO OF INTEREST LIVE (L) - 0 lb 0 lb 0 lb/ft 0 lb/ft 0 lb 0 lb/ft 0 lb/ft LIVE (L) - 0 lb KPFF Consulting Engineers Project : 700 South Flower Street, Suite 2100 Job no. : Los Angeles, CA 90017 Date : (213) 418-0201 S4-1 (WEST)By : SAZ D. DETAILED DESIGN INFORMATION D.1 SHEAR WALL DESIGN DETAILS (AWC SDPWS 2015, Section 4.3) SEISMIC WIND Wall Unit Shear:280 lb/ft 0 lb/ft =N/A Aspect Ratio Factor Wood Structural Panel =1 Structural Fiberboard =N/A Wall Capacities SEISMIC WIND Wall Nominal Unit Shear Capacity =680 lb/ft 950 lb/ft Wall Design Unit Shear Capacity =340 lb/ft 475 lb/ft Wall DCR =0.82 OK 0.00 OK D.2 WALL POST AND HOLDDOWN DESIGN DETAIL POST DESIGN Design Post Compression = 5323 lb B.E. Species: Post Size: 2 in Fc = 9 in Emin = 1.00 c = 1.00 Post Grade: Strong Direction Un-braced Length: Weak Direction Un-braced Length: Adjustment Factors:CD 1.6 CM 1.0 Ct 1.0 CF 1.1 Ci 1.0 Cp 0.2 Buckling Length Coefficients: Strong-Direction, Ke1 =1.0 Weak-Direction, Ke2 =1.0 Post Capacity =9793 lb Post Compression DCR =0.54 OK HOLD DOWN DESIGN Design Holdown Tension = 2198 lb Hold Down Type:SIMPSON- Holdown Capacity =3075 lb Holdown DCR =0.71 OK 2198 lb/ft HDU2-SDS2.5 Douglas Fir-Larch DESIGN VALUE FOR LOAD COMBO OF INTEREST : 5) 0.6D+0.7E 280 lb/ft Actual Depth = 4x6 Actual Width = DESIGN VALUE FOR LOAD COMBO OF INTEREST : 5) 0.6D+0.7E 4962 lb/ft 620000 psi 1350 psi Select Structural 15 ft 0 ft DESIGN VALUE FOR LOAD COMBO OF INTEREST : 5) 0.6D+0.7E Unblocked Shear Wall Adjustment YES 16 Wood Structural Panels - Structural 1 Stud Spacing: Blocking Provided When Required? Panel Edge Fastener Spacing (in.): Sheathing Material: Minimum Nominal Panel Thickness (in.): 6 15/32 10dFastener Size: Fc Size Factor, CF = KPFF Consulting Engineers Project : 700 South Flower Street, Suite 2100 Job no. : Los Angeles, CA 90017 Date : (213) 418-0201 S4-1 (WEST)By : SAZ D.3 SILL BOLT AND SILL PLATE DESIGN DETAILS D.3.1 SILL BOLT DESIGN Design Unit Shear = Sill/Bottom Plate Thickness = Sill Bolt Diameter = Sill Bolt Spacing = Adjustment Factors:CD 1.6 CM 1.0 Ct 1.0 Cg 1.0 CΔ 1.0 Ceg 1.0 Cdi 1.0 Ctn 1.0 Sill Bolt Capacity =1488 lb/bolt Sill Bolt DCR =0.25 OK D.3.2 SILL PLATE DESIGN Design Post Compression = Sill Plate Species = = Boundary Element Size = Adjustment Factors:CM 1.0 Ct 1.0 Ci 1.0 Cb 1.1 Sill Plate Compression Capacity =13320 lb Sill Plate Compression Capacity =0.40 OK 4x6 Douglas Fir-Larch 625 psi DESIGN VALUE FOR LOAD COMBO OF INTEREST : 5) 0.6D+0.7E 280 lb/ft DESIGN VALUE FOR LOAD COMBO OF INTEREST : 5) 0.6D+0.7E 4962 lb/ft 0.625 16 5323 lb/ft 280 lb/ft 2x Design Value: Compression Parallel to Grain, Fc┴ KPFF Consulting Engineers Project : 700 South Flower Street, Suite 2100 Job no. : Los Angeles, CA 90017 Date : (213) 418-0201 S4-1 (WEST)By : SAZ D.4 Wall Deflections and Stiffness D4.1 Wall Deflection (Per 2015 AWC-SDPWS, section 4.3.2) Induced Unit Shear, v =280 lb/ft Wall Height, h =15 ft Wall Length, l =16 ft Modulus of Elasticity of End Post, E =1900000 psi Area of End Post Cross-Section, A =19.25 in^2 Wall Shear Stiffness, Ga =16 kip/in Accounts for nail slip and panel shear deformation as required per 2016 CBC Total Vertical Elongation of Anchorage, Δa =0.09 in δSW =0.359 in Structural Fiberboard Sheathing?NO Final δSW =0.359 in 700 South Flower StreetSuite 2100Los Angeles, CA 90027 project location client by date job no. sheet no.SAZ 2300175 SANTA ANA, CA LOC ARCHITECTS 02/13/2025 COMMENT #31 RESPONSE CITY OF SANTA ANA Planning and Building Agency n\Crcrrh.tc•uu•r �`�� ,, jAjn�nmyed TECHNICAL 13ULFi&*tNSSUANCE TB 82.1 Octobf r 2023(Expires 10?2024: This Joist® TJI$ Ceiling Joist Supporting Attic Load and Roof Th o"ad Date: The following information is intended to assist designers in the specification of TJI" for ceifingjoi t applications supporting both attic load and roof thrust load, as prescribed in 2015/2018/2021 IRC Chapter 8. it is the responsibilit of the designer of record to confirm the conditions of the ceiling joist to be within the limitations of the tables provided in this document. For additional design information regarding TAR' joists. reference Trus Joistg Tll ° Joist Specifier's Guide (TJ 40001. Ceiling Joists Supporting Attic Load and Roof Thrust Load Table 1 provides maximum clear spans for TJlx' ceiling joists supporting "uninhabitable attics with limited storage" or -areas other than sleeping areas" as defined by 2015/2018/2021 IRC Table R301.5 and a roof thrust load based on IRC prescribed connections between roof rafters and ceilingjoists. The nailing requirements for the rafter -to -ceiling joist connection are given by 2015 IRC Table R802.5.1(9), 2018 IRC Table R802.5.2. and 2021 IRC Table R802.5.2(1). Prior to fastening the rafter -to -ceiling joist connection, the TJIe joist must be reinforced to accommodate both the thrust load and tapered end cut (see Trus Joist' TJl6 Rafter Cut/Thrust Load Reinforcement Detail). For ceiling joists supporting only attic load, reference Trus Joist® TW11 Ceiling Joist Supporting Attic Load ITB-805). Design Live Load - 20 psi TABLE 1: TJI" CEILING JOIST SUPPORTING ATTIC LOAD AND ROOF THRUST LOADj11213141 f Design Dead Load = 12 psi Depth Tll' Maximum Clear Spanlsfl417181 20 PSF Live Load / 10 PSF Dead Load 40 PSF Live Load / 10 PSF Dead Load 12" o.c. 16" o.c. 19.Z'r o.c. 24" o.c. 12" o.c. 16" o.c. 19.2" o.c. 24" o.c. 110 22'-3" 20'-1" 18'-11" 17'-6" 17'-6" 15'-10" 14'-10" 13-8" 9%" 210 23'-6" 2V.3" 20'-0" 18' 6" 18' 6" 16'-8" 15'-8" 14' 5' 230 24'-4" 22'-0" 20'-8" 19' 1" 19' 1 17'-3" 16'-2" 14'-11 11' e" 110 26'.7" 24'-1" 22'-6" 20'-1" 20%11' 18'-11" 17'-5" 15'-6 210 28'-l" 25'-5" 23'-10' 22'-0" 22' 1" 19'-11" 18'-8" 17'-0" 230 360 29'-0' 26'-3" 24'-8' 22'-9" 22'-9" 20'-7" 19'-4" 17'-10" 30' 10" 27' 11" 26' 2" 24' 3" 24' 3" 21' 11" 20' 6" 18,111, 560 35'-6" 32'-l" 30'-2' 27'-1It' 27'-11" 25'-2" 23'-7' 21'-10" 110 30' 3" 26'-10" 24'-5" 21'-9" 23' 10" 20'-9" 18' 11" 16-10" 14" 210 31'-11" 28'-11" 26'-10' 23'41" 25'-1" 22'-9" 20'-9" 18'-6" 230 32'-11" 29'-10" 28'-0" 25'-3" 25'-11" 23'-5" 21'-11" 19'-6" 360 35'-0" 31'-9" 29'-9" 2T-7" 27' 7" 24'41" 23'-4" 21'-5" 560 36'-01' 36'-0" 34'-3" 31'8" 3l'-8' 28'-7' 26-10" 24'-9" 16" 110 33'-2" 28'-8" 26'-1" 23'-3" 25'-8" 22'-2" 20'-2" 18'-0" 210 35' 5" 31'-5" 28'-8" 25'-7" 27'-10" 24'-4" 22'-2" 19'-9" 230 36'-0"i9' 33'-l" 30'-3" 27'-0' 28'-9" 25'-8" 23'-5" 20'-10" 360 36- 011 35' 2" 33' 0" 30' 6" 30' 6" 27' 7" 25' 10" 21' 5" 560 1 36-Ong: 36'-Ongl 36'-0-91 35'-1" 35'-1' 31'-8" 29'-9" 11) uniform bads ony 121 Roof thrust bad calculater::.awd on 30 PSF roof Ine%snow load and 10 PSF dead load 131 Roof pitch 6:12 to 12:12. Maximum roof overhang is 24'. 14) Struts or posts supporting roof framing or purtm lines must not be braced to foists. 151 Simple span ony 161 Minimum beanng length of 2%,i' end. 171 Total load deflection limited to L/240 and live bad deflection limited to L/360; assumed no composite action. 181 For UP 110. maximum on center spacing of bracing is 32" o c : for all other U - Joists. use 36' o c. 191 Maximum clear span limited by scope of IRC table Page 1 of 2 700 South Flower StreetSuite 2100Los Angeles, CA 90027 project location client by date job no. sheet no.SAZ 2300175 SANTA ANA, CA LOC ARCHITECTS 02/13/2025 COMMENT #33 RESPONSE 700 South Flower StreetSuite 2100Los Angeles, CA 90027 project location client by date job no. sheet no.SAZ VD 2300175 SANTA ANA, CA LOC ARCHITECTS GRAVITY COMPOSITE BEAM DESIGN 700 South Flower StreetSuite 2100Los Angeles, CA 90027 project location client by date job no. sheet no.SAZ 2300175 SANTA ANA, CA LOC ARCHITECTS 02/13/2025 COMMENT #34 RESPONSE 700 South Flower StreetSuite 2100Los Angeles, CA 90027 project location client by date job no. sheet no.SAZ VD 2300175 SANTA ANA, CA LOC ARCHITECTS GRAVITY COL DESIGN 700 South Flower StreetSuite 2100Los Angeles, CA 90027 project location client by date job no. sheet no.SAZ 2300175 SANTA ANA, CA LOC ARCHITECTS 02/13/2025 COMMENT #38 RESPONSE Steel Beam LIC# : KW-06018621, Build:20.24.10.30 KPFF (c) ENERCALC, LLC 1982-2025 DESCRIPTION:Elevator Guide rail Support Project File: 20240410 santa ana zoo.ec6 Project Title:Santa Ana Zoo Community Hub Bldg Engineer:MQ Project ID:2300175 Project Descr: CODE REFERENCES Calculations per AISC 360-16, IBC 2021 Load Combination Set : ASCE 7-10 Material Properties Analysis Method : ksi Bending Axis :Minor Axis Bending Completely Unbraced Load Resistance Factor Design Fy : Steel Yield :46.0 ksi Beam Bracing :E: Modulus :29,000.0 Span = 13.0 ft HSS10x6x1/4 1 2 L(1.60) .Service loads entered. Load Factors will be applied for calculations.Applied Loads Beam self weight NOT internally calculated and addedLoad(s) for Span Number 1 Point Load : L = 1.60 k @ 6.50 ft, (Guide rail seismic reaction (weak axis)) .Design OKDESIGN SUMMARY Maximum Bending Stress Ratio =0.175 : 1 Load Combination +1.60L Span # where maximum occurs Span # 1 1.280 k Mn * Phi : Allowable 47.623 k-ft Vn * Phi : Allowable HSS10x6x1/4Section used for this span Span # where maximum occurs Location of maximum on span Span # 1 Load Combination +1.60L 61.361 k Section used for this span HSS10x6x1/4 Mu : Applied Maximum Shear Stress Ratio =0.021 : 1 0.000 ft 8.320 k-ft Vu : Applied 0 <360 1570 Ratio =0 <180 Maximum Deflection Max Downward Transient Deflection 0 in 0Ratio =<360 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.099 in Ratio =>=180 Max Upward Total Deflection 0 in n/a n/a Span: 1 : L Only n/a .Maximum Forces & Stresses for Load Combinations Span # Summary of Moment Values Summary of Shear ValuesLoad Combination Max Stress Ratios M V max Mu -max Mu +Rm VnyMu Max Phi*Mny Cb VuMaxMny Phi*VnySegment Length Dsgn. L = 13.00 ft 1 0.000 52.91 47.62 1.00 1.00 -0.00 68.18 61.36 +1.60L Dsgn. L = 13.00 ft 1 0.175 0.021 8.32 8.32 52.91 47.62 1.32 1.00 1.28 68.18 61.36 +0.50L Dsgn. L = 13.00 ft 1 0.055 0.007 2.60 2.60 52.91 47.62 1.32 1.00 0.40 68.18 61.36 . Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections L Only 1 0.0994 6.500 0.0000 0.000 . Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS Max Upward from all Load Conditions 0.800 0.800 Max Upward from Load Combinations 0.600 0.600 Max Upward from Load Cases 0.800 0.800 L Only 0.800 0.800 +0.750L 0.600 0.600 < 1/8" MAX Steel Beam LIC# : KW-06018621, Build:20.24.10.30 KPFF (c) ENERCALC, LLC 1982-2025 DESCRIPTION:Elevator Hoist Beam Project File: 20240410 santa ana zoo.ec6 Project Title:Santa Ana Zoo Community Hub Bldg Engineer:MQ Project ID:2300175 Project Descr: CODE REFERENCES Calculations per AISC 360-16, IBC 2021 Load Combination Set : ASCE 7-10 Material Properties Analysis Method : ksi Bending Axis :Major Axis Bending Completely Unbraced Load Resistance Factor Design Fy : Steel Yield :50.0 ksi Beam Bracing :E: Modulus :29,000.0 Span = 8.330 ft W8x28 1 2 L(7.50) .Service loads entered. Load Factors will be applied for calculations.Applied Loads Beam self weight calculated and added to loadingLoad(s) for Span Number 1 Point Load : L = 7.50 k @ 4.170 ft .Design OKDESIGN SUMMARY Maximum Bending Stress Ratio =0.248 : 1 Load Combination +1.20D+1.60L Span # where maximum occurs Span # 1 6.147 k Mn * Phi : Allowable 102.000 k-ft Vn * Phi : Allowable W8x28Section used for this span Span # where maximum occurs Location of maximum on span Span # 1 Load Combination +1.20D+1.60L 68.913 k Section used for this span W8x28 Mu : Applied Maximum Shear Stress Ratio =0.089 : 1 8.330 ft 25.251 k-ft Vu : Applied 0 <1,667 1778 Ratio =0 <240.0 Maximum Deflection Max Downward Transient Deflection 0.055 in 1,812Ratio =>=1,66 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.056 in Ratio =>=240. Max Upward Total Deflection 0 in Span: 1 : L Only n/a Span: 1 : +D+L n/a .Maximum Forces & Stresses for Load Combinations Span # Summary of Moment Values Summary of Shear ValuesLoad Combination Max Stress Ratios M V max Mu -max Mu +Rm VnxMu Max Phi*Mnx Cb VuMaxMnx Phi*VnxSegment Length +1.40D Dsgn. L = 8.33 ft 1 0.003 0.002 0.34 0.34 113.33 102.00 1.14 1.00 0.16 68.91 68.91 +1.20D+1.60L Dsgn. L = 8.33 ft 1 0.248 0.089 25.25 25.25 113.33 102.00 1.31 1.00 6.15 68.91 68.91 +1.20D+0.50L Dsgn. L = 8.33 ft 1 0.079 0.029 8.09 8.09 113.33 102.00 1.31 1.00 2.02 68.91 68.91 +1.20D Dsgn. L = 8.33 ft 1 0.003 0.002 0.29 0.29 113.33 102.00 1.14 1.00 0.14 68.91 68.91 +0.90D Dsgn. L = 8.33 ft 1 0.002 0.002 0.22 0.22 113.33 102.00 1.14 1.00 0.10 68.91 68.91 . Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections +D+L 1 0.0562 4.189 0.0000 0.000 . Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS Max Upward from all Load Conditions 3.862 3.871 Max Upward from Load Combinations 3.862 3.871 Max Upward from Load Cases 3.745 3.755 D Only 0.117 0.117 +D+L 3.862 3.871 +D+0.750L 2.926 2.932 Steel Beam LIC# : KW-06018621, Build:20.24.10.30 KPFF (c) ENERCALC, LLC 1982-2025 DESCRIPTION:Elevator Hoist Beam Project File: 20240410 santa ana zoo.ec6 Project Title:Santa Ana Zoo Community Hub Bldg Engineer:MQ Project ID:2300175 Project Descr: Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS +0.60D 0.070 0.070 L Only 3.745 3.755 700 South Flower StreetSuite 2100Los Angeles, CA 90027 project location client by date job no. sheet no.SAZ 2300175 SANTA ANA, CA LOC ARCHITECTS 02/13/2025 OPERABLE PARTITION SUPPORT Steel Beam LIC# : KW-06018621, Build:20.24.10.30 KPFF (c) ENERCALC, LLC 1982-2025 DESCRIPTION:Partition Support Project File: 20240410 Santa Ana Zoo.ec6 Project Title:Santa Ana Zoo Community Hub Bldg Engineer:MQ Project ID:2300175 Project Descr: CODE REFERENCES Calculations per AISC 360-16, IBC 2021 Load Combination Set : ASCE 7-10 Material Properties Analysis Method : ksi Bending Axis :Major Axis Bending Completely Unbraced Load Resistance Factor Design Fy : Steel Yield :50.0 ksi Beam Bracing :E: Modulus :29,000.0 Span = 36.0 ft W10x45 1 2 D(0.130) .Service loads entered. Load Factors will be applied for calculations.Applied Loads Beam self weight calculated and added to loading Uniform Load : D = 0.130 k/ft, Tributary Width = 1.0 ft .Design OKDESIGN SUMMARY Maximum Bending Stress Ratio =0.376 : 1 Load Combination +1.40D Span # where maximum occurs Span # 1 4.410 k Mn * Phi : Allowable 105.430 k-ft Vn * Phi : Allowable W10x45Section used for this span Span # where maximum occurs Location of maximum on span Span # 1 Load Combination +1.40D 106.050 k Section used for this span W10x45 Mu : Applied Maximum Shear Stress Ratio =0.042 : 1 0.000 ft 39.690 k-ft Vu : Applied 0 <360 468 Ratio =0 <240.0 Maximum Deflection Max Downward Transient Deflection 0 in 0Ratio =<360 Max Upward Transient Deflection 0 in Ratio = Max Downward Total Deflection 0.924 in Ratio =>=240. Max Upward Total Deflection 0 in n/a n/a Span: 1 : D Only n/a .Maximum Forces & Stresses for Load Combinations Span # Summary of Moment Values Summary of Shear ValuesLoad Combination Max Stress Ratios M V max Mu -max Mu +Rm VnxMu Max Phi*Mnx Cb VuMaxMnx Phi*VnxSegment Length +1.40D Dsgn. L = 36.00 ft 1 0.376 0.042 39.69 39.69 117.14 105.43 1.14 1.00 4.41 106.05 106.05 +1.20D Dsgn. L = 36.00 ft 1 0.323 0.036 34.02 34.02 117.14 105.43 1.14 1.00 3.78 106.05 106.05 +0.90D Dsgn. L = 36.00 ft 1 0.242 0.027 25.52 25.52 117.14 105.43 1.14 1.00 2.84 106.05 106.05 . Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl Overall Maximum Deflections D Only 1 0.9238 18.103 0.0000 0.000 . Load Combination Support 1 Support 2 Vertical Reactions Support notation : Far left is #1 Values in KIPS Max Upward from all Load Conditions 3.150 3.150 Max Upward from Load Combinations 1.890 1.890 Max Upward from Load Cases 3.150 3.150 D Only 3.150 3.150 +0.60D 1.890 1.890 =10.5 PSF(12') BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: Report Prepared by: Job Number: Date: The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2022 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC – www.energysoft.com. Santa Ana Zoo -Building A 11041 Santa Monica Blvd #509 3203 East 4th Street Los Angeles, CA 90063 LOC ARCHITECTS SF Engineering 213-537-0480 Santa Ana, CA 92701 10/17/2024 24616 Los Angeles, CA 90025 310-386-2400 1801 E Chestnut Avenue TABLE OF CONTENTS 3 1 Table of Contents 2 Form NRCC-PLB-E Domestic Water Heating System 19 Form NRCC/LMCC-PRF-E Certificate of Compliance Cover Page CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 1 of 16) Project Name: Santa Ana Zoo -Building A Date Prepared: 2024-10-17 A. General Information 1 Project Name Santa Ana Zoo -Building A 2 Run Title Title 24 Analysis 3 Project Location 1801 E Chestnut Avenue 4 City Santa Ana 5 Standards Version Compliance 2022 6 Zip code 92701 7 Compliance Software (version)EnergyPro 9.3 8 Climate Zone 8 9 Building Orientation (deg)0 10 Building Type(s)• Nonresidential 11 Weather File COSTA-MESA-WAYNE_STYP20.epw 12 Project Scope • New envelope and mechanical 13 Number of Dwelling Units 0 14 Total Conditioned Floor Area in Scope (ft2)2400 15 Total # of hotel/motel rooms 0 16 Total Unconditioned Floor Area (ft2)0 17 Fuel Type Natural gas 18 Nonresidential Conditioned Floor Area 2400 19 Total # of Stories (Habitable Above Grade)1 20 Residential Conditioned Floor Area 0 CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 2 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 B. PROJECT SUMMARY Table B shows which building components are included in the performance calculation. If indicated as not included, the project must show compliance prescriptively if within the permit application. Building Components Complying via Performance Building Components Complying Prescriptively Envelope (See Table G) Nonres Performance Solar Thermal Water Heating (See Table I3) Performance The following building components are ONLY eligible for prescriptive compliance and should be documented on the NRCC form listed if within the scope of the permit application (i.e. compliance will not be shown on the NRCC-PRF-E).MultiFam Not Included Not Included Mechanical (See Table H) Nonres Performance Covered Process: Commercial Kitchens (see Table J) Performance Indoor Lighting (Unconditioned) 140.6 & 170.2(e) NRCC-LTI-E is required MultiFam Not Included Not Included Outdoor Lighting 140.7 & 170.2(e)NRCC-LTO-E is required Domestic Hot Water (See Table I) Nonres Performance Covered Process: Laboratory Exhaust (see Table J) Performance Sign Lighting 140.8 & 170.2(e)NRCC-LTS-E is required MultiFam Not Included Not Included Building Components Complying with Mandatory Measures Lighting (Indoor Conditioned, see Table K) Nonres Not Included Photovoltaics (see Table F) Performance Electrical power systems, commissioning, solar ready, elevator and escalator requirements are mandatory and should be documented on the NRCC form listed if applicable (i.e. compliance will not be shown on the NRCC-PRF-E.) MultiFam Not Included Not Included Electrical Power Distribution 110.11 NRCC-ELC-E is required Battery (see Table F) Performance Commissioning 120.8 NRCC-CXR-E is required Not Included Solar and Battery 110.10 NRCC-SAB-E is required CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 3 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 C1. COMPLIANCE SUMMARY COMPLIES3 Time Dependent Valuaton (TDV)Source Energy Use Efficiency1 (kBtu/ft2 - yr)Total2 (kBtu/ft2 - yr)Total2 (kBtu/ft2 - yr) Standard Design 335.47 217.21 21.51 Proposed Design 230.09 196.78 15.97 Compliance Margins 105.38 20.43 5.54 Pass Pass Pass 1 Efficiency measures include improvements like a better building envelope and more efficient equipment 2 Compliance Totals include efficiency, photovoltaics and batteries 3 New Construction, Complete Addition Scope: Building complies when all efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded Existing, Addition and Alteration Scope: Building complies when efficiency compliance margin is greater than or equal to zero and unmet load hour limits are not exceeded CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 4 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 C2. TDV ENERGY COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS (Annual TDV Energy Use, kBtu/ft 2 - yr) COMPLIES2 Energy Component Standard Design (TDV)Proposed Design (TDV)Compliance Margin (TDV)1 Space Heating 0.42 14.8 -14.38 Space Cooling 88.82 85.07 3.75 Indoor Fans 168.14 54.42 113.72 Heat Rejection 0 0 0 Pumps & Misc.0 0 0 Domestic Hot Water 7.53 5.24 2.29 Indoor Lighting 70.56 70.56 0 Flexibility --------- EFFICIENCY COMPLIANCE TOTAL 335.47 230.09 105.38 (31.4%) Photovoltaics -117.99 -33.31 -84.68 Batteries -0.27 ----0.27 TOTAL COMPLIANCE 217.21 196.78 20.43 (9.4%) 1 Notes: This number in parenthesis following the Compliance Margin in column 4, represents the Percent Better than Standard. CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 5 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 C3. TDV ENERGY RESULTS FOR NON-REGULATED COMPONENTS1 Non-Regulated Energy Component Standard Design (TDV)Proposed Design (TDV)Compliance Margin (TDV)1 Receptacle 108.29 108.29 --- Process --------- Other Ltg --------- Process Motors --------- TOTAL (TOTAL COMPLIANCE + NON-REGULATED COMPONENTS)325.5 305.07 20.43 (6.3%) 1 Notes: This table is not used for Energy Code Compliance. CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 6 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 C4. SOURCE ENERGY COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS (Annual SOURCE Energy Use, kBtu/ft 2 /yr) COMPLIES2 Energy Component Standard Design (SOURCE)Proposed Design (SOURCE)Compliance Margin (SOURCE)1 Space Heating 0.13 2.19 -2.06 Space Cooling 3.84 3.4 0.44 Indoor Fans 14.89 4.82 10.07 Heat Rejection 0 0 0 Pumps & Misc.0 0 0 Domestic Hot Water 0.72 0.47 0.25 Indoor Lighting 6.27 6.27 0 Flexibility --------- EFFICIENCY COMPLIANCE TOTAL 25.85 17.15 8.7 (33.7%) Photovoltaics -4.23 -1.18 -3.05 Batteries -0.11 ----0.11 TOTAL COMPLIANCE 21.51 15.97 5.54 (25.8%) 1 Notes: This number in parenthesis following the Compliance Margin in column 4, represents the Percent Better than Standard. CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 7 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 C5. SOURCE ENERGY RESULTS FOR NON-REGULATED COMPONENTS1 Non-Regulated Energy Component Standard Design (SOURCE)Proposed Design (SOURCE)Compliance Margin (SOURCE)1 Receptacle 9.56 9.56 --- Process --------- Other Ltg --------- Process Motors --------- TOTAL ( TOTAL COMPLIANCE + NON-REGULATED COMPONENTS)31.07 25.53 5.54 (17.8%) 1 Notes: This table is not used for Energy Code Compliance. C6. 'ABOVE CODE' QUALIFICATIONS This project is pursuing CalGreen Tier 1 This project is pursuing CalGreen Tier 2 CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 8 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 C7. ENERGY USE SUMMARY Energy Component Standard Design Site (MWh) Proposed Design Site (MWh) Margin (MWh) Standard Design Site (MBtu) Proposed Design Site (MBtu) Margin (MBtu) Space Heating ---1.2 ---0.3 ------ Space Cooling 5.8 5.3 0.5 --------- Indoor Fans 14.4 4.7 9.7 --------- Heat Rejection ------------------ Pumps & Misc.------------------ Domestic Hot Water 0.7 0.5 0.2 --------- Indoor Lighting 6 6 0 --------- Flexibility ------------------ EFFICIENCY TOTAL 26.9 17.7 9.2 0.3 0 0.3 Photovoltaics -12.5 -3.5 -9 --------- Batteries 0 --------------- ENERGY USE SUBTOTAL 14.4 14.2 0.2 0.3 0 0.3 Receptacle 9.2 9.2 0 --------- Process ------------------ Other Ltg ------------------ Process Motors ------------------ ENERGY USE TOTAL 23.6 23.4 0.2 0.3 0 0.3 CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 9 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 C8. ENERGY USE INTENSITY (EUI) Standard Design (kBtu/ft2 / yr)Proposed Design (kBtu/ft2 / yr)Margin (kBtu/ft2 / yr)Margin Percentage GROSS EUI1 51.45 38.24 13.21 25.68 NET EUI1 33.68 33.27 0.41 1.22 1 Notes: Gross EUI is Energy Use Total (not including PV)/Total Building Area. Net EUI is Energy Use Total (including PV)/Total Building Area. D1. EXCEPTIONAL CONDITIONS • The aged solar reflectance and aged thermal emittance must be listed in the Cool Roof Rating Council database of certified products. For projects where initial reflectance is used, the initial reflectance must be listed, and the aged reflectance is calculated by the software program and used in the compliance model. • The project uses the Simplified Geometry Performance Modeling Approach which is not capable of modeling daylighting controls and assumes the prescriptive Secondary Daylit Control requirements are met. PRESCRIPTIVE COMPLIANCE documentation (form NRCC-LTI-02-E) for the requirements of section 140.6(d) Automatic Daylighting Controls in Secondary Daylit Zones is required. • PV/Battery Building Type has been modified from software defaults for one or more spaces. Review project’s PV/Battery Building Type(s) with documentation author. Refer to Energy Code section 140.10 for Nonresidential or 170.2(g) for more information. E4. ADDITIONAL REMARKS This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. Standard Building (Compliance) F1. REQUIRED PV SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 12 DC System Size (kWdc)Exception1 Module Type Array Type Power Electronics CFI Azimuth (deg)Tilt Input Array Angle (deg)Tilt: (x in 12)Inverter Eff. (%) Annual Solar Access (%) 2 Standard (14-17%)Fixed none false 180 Degrees 22 4.85 96 100 1See Table D1 for any PV exceptions used. CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 10 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 F1B. PV BATTERY BUILDING TYPE(S) 01 02 03 Building Occupancy Type*(From Table 140.10-A/B and 170.2-U/V)Conditioned Floor Area (ft2)Unconditioned Floor Area (ft2) Grocery 0 0 High-Rise Multifamily 0 0 Office, Financial Institutions, Unleased Tenant Space 2400 0 Retail 0 0 School 0 0 Warehouse 0 0 Auditorium, Convention Center, Hotel/Motel, Library, Medical Office Building/Clinic, Restaurant, Theater 0 0 None 0 0 *Building Occupancy Types are defined in Section 100.1 of the Energy Code G1. ENVELOPE GENERAL INFORMATION (conditioned spaces only) 01 02 03 04 Opaque Surfaces & Orientation Total Gross Surface Area (ft2)Total Fenestration Area (ft2)Window to Wall Ratio (%) North-Facing1 1216 50 4.11 East-Facing2 518 0 0 South-Facing3 888 265.5 29.9 West-Facing4 518 240 46.33 Total 3140 555.5 17.69 Roof 2400 0 0 Notes 1North-Facing is oriented to within 45 degrees of true north, including 45 00'00" east of north (NE), but excluding 45 00'00" west of north (NW), 2East-Facing is oriented to within 45 degrees of true east, including 45 00'00" south of east (SE), but excluding 45 00'00" north of east (NE), 3South-Facing is oriented to within 45 degrees of true south, including 45 00'00" west of south (SW), but excluding 45 00'00" east of south (SE), 4West-Facing is oriented to within 45 degrees of true west, including 45 00'00" north of west (NW), but excluding 45 00'00" south of west (SW), CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 11 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 G2A. ROOFING PRODUCT SUMMARY (NONRESIDENTIAL) 01 02 03 04 05 06 Assembly Name Roof Pitch Roof Rise (x in 12)Aged Solar Reflectance Thermal Emittance SRI R-30 Roof13 LowSlope N/A 0.53 0.88 N/A G4. NONRESIDENTIAL AIR BARRIER 01 02 Building Story Name Air Barrier Com-Floor 1 No air barrier G5. OPAQUE SURFACE ASSEMBLY SUMMARY 01 02 03 04 05 06 07 08 09 10 Surface Name Construction Type Area (ft2)Framing Type Cavity R-Value Continuous R-Value Units Value Description of Assembly Layers Status1 Interior Exterior Metal frame 2x8 wall - 248 Exterior Wall 3,140 Metal 22 N/A N/A U-factor 0.149 Stucco - 7/8 in. Vapor permeable felt - 1/8 in. Composite-1 Gypsum Board - 1/2 in. N R-30 Roof13 Roof 2,400 N/A 30 N/A N/A U-factor 0.072 Metal Standing Seam - 1/16 in. Composite-2 N Slab On Grade23 Underground Floor 2,400 N/A 0 N/A N/A F-factor 0.73 Slab Type =Unheated slab on grade Insulation Orientation =None Insulation R-Value =none N 1 Status: N - New, A - Altered, E - Existing CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 12 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 G7A. FENESTRATION ASSEMBLY SUMMARY (NONRESIDENTIAL) 01 02 03 04 05 06 07 08 09 Fenestration Assembly Name Fenestration Type/ Product Type / Frame Type Certification Method1 Assembly Method Area (ft2) Overall U-factor Overall SHGC Overall VT Status2 Dual glazing Low E glass Vertical fenestration Fixed window N/A NFRC Manufactured 555.5 0.36 0.25 0.5 N 1 Notes: Newly installed fenestration shall have a certified NFRC Label Certificate or use the CEC default tables found in Table 110.6-A and Table 110.6-B. Center of Glass (COG) values are for the glass-only, determined by the manufacturer, and are shown for ease of verification. Site-built fenestration values are calculated per Nonresidential Appendix NA6 and are used in the analysis. 2 Status: N - New, A - Altered, E - Existing G8. OVERHANG DETAILS 01 02 03 04 05 06 07 Fenestration Tag/ ID Azimuth Depth (ft)Height from Top of Sill to Overhang (ft)Right Extent (ft)Left Extent (ft)Flap Height Window15 180 8 7.1 8 8 N/A Window16 180 8 7.1 8 8 N/A Window17 180 8 7.1 8 8 N/A Window18 180 8 7.1 8 8 N/A Window19 180 8 7.1 8 8 N/A CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 13 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 H1. DRY SYSTEM EQUIPMENT (FURNACES, AIR HANDLING UNITS, HEAT PUMPS, VRF, ECONOMIZERS ETC.) 01 02 03 04 05 06 07 08 09 10 11 12 Equipment Name Equipment Type Qty Heating Cooling Economizer Type (if present) Status1Total Heating Output (kBtu/h) Supp Heat Output (kBtu/h) Efficiency Unit Efficiency Total Cooling Output (kBtu/h) Efficiency Unit Efficiency Multipurpose room Variable Refrigerant Flow 1 216 N/A COP 3.55 192 EER 11.8 N/A N 1 Status: N - New, A - Altered, E - Existing H3. NONRESIDENTIAL / COMMON USE AREA FAN SYSTEMS SUMMARY 01 02 03 04 05 06 07 08 09 10 11 12 13 Name or Item Tag Qty Design OA CFM Supply Fan Return / Relief Fan Status1 CFM Power Power Units Control Fan Type CFM Power Power Units Control 2-Multipurpose room-VRF 2 600 2,543 0.46 BHP Constant Vol N/A N/A N/A N/A N/A N 1 Status: N - New, A - Altered, E - Existing H8. SYSTEM SPECIAL FEATURES 01 02 03 04 System Name Equipment Type Interlocks per 140.4(n)1 Other Special Features and Controls Multipurpose room Variable Refrigerant Flow N/A Heat Recovery Plant - DHW1 - SHW Service Hot Water N/A Fixed Temperature Control Notes: This table includes controls related to the performance path only. For projects using the prescriptive path, mandatory and prescriptive controls requirements are documented on the NRCC-MCH-E. 1 Yes = interlocks are provided, No = interlocks are not provided, NA means no operable openings. CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 14 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 H9. NONRESIDENTIAL / COMMON USE AREA & HOTEL/MOTEL VENTILATION 01 02 03 04 05 06 07 Zone Name Mechanical Ventilation Conditioned Area (sf)DCV or Occupant Sensor Controls, or BothVentilation Function # of People Supply OA CFM Exhaust CFM 1-Multipurpose room General - Conference/meeting 80 1200 0 2400 N/A H11. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY 01 02 03 04 05 06 07 08 09 10 11 12 System ID System Type Qty Rated Capacity (kBtuh)Airflow (cfm)Fan VSD Heating Cooling Design MIn.Min. Ratio Power Power Units Cycles 2-Multipurpose room-VRF Variable Refrigerant Flow 2 108 96 2,543 N/A N/A 0.46 BHP Continuous I1. WATER HEATER EQUIPMENT SUMMARY 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Name Heater Element Type Tank Type Qty Tank Vol (gal) Rated Input Rated Input Unit Efficiency Efficiency Unit Tank Insulation R-value Int/Ext Standby Loss Fraction 1st Hr. Rating or Flow Rate (gal) Heat Pump Type Tank Location or Ambient Condition Instantaneous Electric2 Electricity Instantaneous 1 1 2.3 kW 0.98 UEF N/A N/A 8 N/A N/A L. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION Selections made by Documentation Author indicate which Certificates of Installation must be submitted for the features to be recognized for compliance. These documents must be retained and provided to the building inspector during construction and can be found online Building Component Form/Title Envelope NRCI-ENV-01-E - Must be submitted for all buildings Envelope NRCI-ENV-E - Envelope (for all buildings) CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 15 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 L. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION Selections made by Documentation Author indicate which Certificates of Installation must be submitted for the features to be recognized for compliance. These documents must be retained and provided to the building inspector during construction and can be found online Building Component Form/Title Mechanical NRCI-MCH-01-E - Must be submitted for all buildings Mechanical NRCI-MCH-E - For all buildings with Mechanical Systems Plumbing NRCI-PLB-01-E - Must be submitted for all buildings Plumbing NRCI-PLB-E - For all buildings with Plumbing Systems NRCI-SAB-E - Solar Water Heating, PV and Battery Storage Systems M. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE Selections made by Documentation Author indicate which Certificates of Acceptance must be submitted for the features to be recognized for compliance. These documents must be provided to the building inspector during construction and must be completed through an Acceptance Test Technician Certification Provider (ATTCP). Building Component Form/Title & System Name(s) Envelope NRCA-ENV-02-F - NRFC label verification for fenestration N. DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION Selections made by Documentation Author indicate which Certificates of Verification must be submitted for the features to be recognized for compliance. These documents must be retained and provided to the building inspector during construction and can be found online There are no Certificates of Verification applicable to this project CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 16 of 16) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:31:24 Compliance ID: EnergyPro-1339-1024-0063 Documentation Author's Declaration Statement 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Signature Date:Company: SF Engineering Address: 11041 Santa Monica Blvd #509 CEA/HERS Certification Identification (if applicable): City/State/Zip: Los Angeles, CA 90025 Phone: 310-386-2400 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Compliance is true and correct. 2.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer) 3.The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5.I understand that a registered copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to accomplish this requirement. 6.I understand that a registered copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to accomplish these requirements. Responsible Designer Name:Responsible Designer Signature: Company: LOC ARCHITECTS Address: 3203 East 4th Street Date Signed: City/State/Zip: Los Angeles, CA 90063 License #: Phone: 213-537-0480 Title:Scope: Responsible Designer Name: Shahram Farzan Responsible Designer Signature: Company: SF Engineering Address: 11041 Santa Monica Blvd, Suite 509 Date Signed: City/State/Zip: Los Angeles, CA 90025 License #: M-24912 Phone: (310) 386-2400 Title:Scope:   Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0115 Report Generated: 2024-10-17 11:32:11 STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E This document is used to demonstrate compliance for nonresidential occupancies with requirements in 110.1, 110.3, 120.3, and 140.5, and with requirements in 141.0 for additions and alterations, for domestic water heating scopes using the prescriptive path. For high-rise residential and hotel/motel occupancies compliance is demonstrated with requirements in 110.1, 110.3, 160.4 and 170.2(d), and with requirements 180.1 for additions and 180.2 for alterations. Project Name: Santa Ana Zoo -Building A Report Page: (Page 1 of 6) Project Address: 1801 E Chestnut Avenue Date Prepared: 10/17/2024 A. GENERAL INFORMATION 01 Project Location (city)Santa Ana 02 Climate Zone 8 03 Occupancy Types Within Project (select all that apply): ● All Other Occupancies B. PROJECT SCOPE This table includes domestic water heating systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive paths outlined in 140./ 170.2(d) and 141.0(a)/ 180.1, or 141.0(b)2N / 180.2 for additions or alterations. Solar water heating systems are documented on the NRCC-SAB compliance document. Combined hydronic water heating systems are documented on the NRCC-MCH compliance document. 01 02 03 My project consists of (check all that apply):System Type1,2 System Components New system (DHW system being installed for the first time)Individual System (serving nonresidential spaces)Equipment Distribution Controls System Alteration (equipment, distribution or controls)Equipment Distribution Controls 1FOOTNOTES: Point of use water heaters, or other non-central systems used to serve nonresidential spaces, are considered individual systems. 2 Dwelling units refers to hotel/motel guest rooms and units in a multifamily residential occupancy. 3 DHW systems serving 2 or more dwelling units are considered "Central Systems" for multifamily occupancies C. COMPLIANCE RESULTS Table C will indicate if the project data input into the compliance document is compliant with water heating requirements. If this table says "DOES NOT COMPLY" or "COMPLIES with Exceptional Conditions" refer to Table D. or the table indicated as not compliant for guidance. 01 02 03 04 Domestic Hot Water Equipment Distribution Systems Controls Compliance ResultsTable F Table G Table H Yes Yes Yes COMPLIES D. EXCEPTIONAL CONDITIONS This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form. STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building A Report Page: (Page 2 of 6) Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0115 Report Generated: 2024-10-17 11:32:11 E. ADDITIONAL REMARKS This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. F. DOMESTIC HOT WATER EQUIPMENT This table is used to demonstrate compliance with mandatory equipment requirements in 110.1 and 110.3. Compliance with prescriptive requirements in 140.5(c) / 170.2(d) must also be demonstrated and with 141.0 / 180.1/ 180.2 for addition and alteration scopes. Equipment Schedule: Water Heating Efficiency and Standby Loss 03 04 05 06 System Name Instantaneous Electric Exception to 140.5(c)/ 170.2(d)3   Gas Service Water Heating System >= 1MMBtu/h1 Capacity-weighted Average Efficiency %  07 08 09 10 11 12 13 14 15 Name or Item Tag Equipment Type Volume (gal) Rated Input Capacity (Btu/h) Max GPM/ First Hour Rating (FHR) Rated Efficiency Minimum Efficiency Required Efficiency Unit Designed Standby Loss Maximum Standby Loss Instantan eous Electric Consumer Rated Electric Instantaneous ( <=12kW) 1 7,850 FHR >=75 0.98 0.92 UEF    1FOOTNOTE: In systems >= 1MMBtu/h with multiple units, gas water heaters with input capacity > 100,000 Btu/h may meet 90% Et requirements via an input capacity-weighted average. Water Heating Equipment All Occupancies Yes No Not Applicable Requirement 18 Unfired storage tank insulation shall have Internal + External >=R-16 OR External >=R-3.5. Label required per 110.3(c)3 19 New state buildings 60% of energy for service water heating from site solar energy or recovered energy per 110.3(c)5 20 Isolation valves for instantaneous water heater with input rating >6.8 kBTUH or 2 kW has been specified per 110.3(c)6 21 School buildings < 25,000 ft2 and < 4 stories must install a heat pump water heating system per 140.5(a)1. Water heating systems serving an individual bathroom space may be an instantaneous electric water heater. STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building A Report Page: (Page 3 of 6) Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0115 Report Generated: 2024-10-17 11:32:11 G. DOMESTIC HOT WATER DISTRIBUTION SYSTEM This table is used to demonstrate compliance for nonresidential occupancies with distribution requirements in 120.3 and 140.5. For multifamily and hotel/motel occupancies, compliance is demonstrated with requirements 110.3(c), 160.4, 170.2(d). Mandatory Pipe Insulation All Occupancies 13 For systems serving dwelling units, pipe insulation must meet the minimum insulation requirements in Table 160.4-A (see blow) except: •Piping that penetrates framing members shall not be required to have pipe insulation for the distance of the framing penetration. Piping that penetrates metal framing shall use grommets, plugs, wrapping or other insulating material to assure that no contact is made with the metal framing. Insulation shall abut securely against all framing members •Piping installed in interior or exterior walls shall not be required to have pipe insulation if all of the requirements are met for compliance with Quality Insulation Installation (QII) as specified in the Reference Residential Appendix RA3.5. •Piping surrounded with a minimum of 1 inch of wall insulation, 2 inches of crawlspace insulation, or 4 inches of attic insulation, shall not be required to have pipe insulation. 14 For systems serving nonresidential spaces, pipe insulation for the following applications is specified to comply with Table 120.3-A (see below) per 120.3: •Recirculating system piping, including supply and return piping of the water heater •The first 8 ft of hot and cold outlet piping, including between storage tank and heat trap, for a nonrecirculating storage system •Pipes that are externally heated 15 Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to weather shall be installed with a cover suitable for outdoor service per 120.3(b) / 160.4(f). Pipe insulation buried below grade must be installed in a water proof and non-crushable casing or sleeve. TABLE 120.3-A / 160.4-A PIPE INSULATION THICKNESS Fluid Temperature Range ( °F) Conductivity Range (Btu-in per hour per ft2 per °F) Insulation Mean Rating Temp ( °F) Nominal Pipe Diameter (in) < 1 1 to < 1.5 1.5 to < 4 1.5 to < 4 Multifamily & Hotel/Motel Minimum Insulation Required 105-140 0.22 - 0.28 100 1.0 in or R-7.7 1.5 in or R-12.5 1.5 in or R-11 2.0 in or R-16 STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building A Report Page: (Page 4 of 6) Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0115 Report Generated: 2024-10-17 11:32:11 H. DOMESTIC HOT WATER CONTROLS This table is used to demonstrate compliance with control requirements in 110.3 for all occupancies. For multifamily residential and hotel/motel occupancies, compliance is also demonstrated with requirements in 160.4(e) / 170.2(d). Yes No Not Applicable Requirement 01 Construction documents require manufacturer certification that service water-heating systems are equipped with automatic temperature controls capable of adjusting temperature settings per 110.3(a). 02 Systems with capacity > 167,000 BTUH equipped with outlet temperature controls per 110.3(c)1 unless covered by California Plumbing Code 613.0. 03 Controls for circulating pumps or electrical heat trace systems are capable of automatically turning off the system per §110.3(c)2  unless systems serves healthcare facility. 04 For recirculation systems serving multiple dwelling units, design includes automatic pump controls per 170.2(d) or 180.1(b)3 for additions. 05 For recirculation systems serving individual dwelling units, design includes manual on/off controls as specified in Reference Appendix RA4.4.9 per 170.2(d). 06 Combustion air positive shut-off shall be provided per 160.4(3).on all newly installed commercial boilers as follows: •Boilers with input capacity >= 2.5 MMBtu/h, in which the boiler is designed to operate with a nonpositive vent static pressure •Boilers where one stack serves two or more boilers with a total combined input capacity per stack of 2.5 MMBtu/h. 07 Boiler combustion air fans with motor >= 10 hp shall meet one of the following •The fan motor shall be driven by a variable speed drive OR •The fan motor shall include controls that limit the fan motor demand to <=30% of the total design wattage at 50% of the design air volume. 08 Newly installed boilers with an input capacity {d:gte/] 5MMBtu/h and a steady state full-load combustion efficiency < 90% shall maintain excess (stack-gas) oxygen concentrations <= 5% by volume on a dry basis over firing rates of 20-100%. Combustion air volume shall be controlled with respect to firing rate or flue gas oxygen concentration. Use of a common gas and combustion air control linkage or jack shaft is prohibited. STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building A Report Page: (Page 5 of 6) Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0115 Report Generated: 2024-10-17 11:32:11 I. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION Selections have been made based on information provided in this document. If any selection have been changed by permit applicant, an explanation should be included in Table E. Additional Remarks. These documents must be provided to the building inspector during construction and can be found online Form/Title NRCI-PLB-E - Must be submitted for all buildings J. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE There are no forms required for this project. K. DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION There are no forms required for this project. STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building A Report Page: (Page 6 of 6) Project Address: 1801 E Chestnut Avenue Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0115 Report Generated: 2024-10-17 11:32:11 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Company: SF Engineering Signature Date: 2024-10-17 Address: 11041 Santa Monica Blvd #509 CEA/ HERS Certification Identification (if applicable): City/State/Zip: Los Angeles CA 90025 Phone: 310-386-2400 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Compliance is true and correct. 2.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer) 3.The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5.I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Shahram Farzan Responsible Designer Signature: Company: SF Engineering Date Signed: 2024-10-17 Address: 11041 Santa Monica Blvd, Suite 509 License: M-24912 City/State/Zip: Los Angeles CA 90025 Phone: (310) 386-2400 BUILDING ENERGY ANALYSIS REPORT PROJECT: Project Designer: Report Prepared by: Job Number: Date: The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2022 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC – www.energysoft.com. Santa Ana Zoo -Building B 11041 Santa Monica Blvd #509 3203 East 4th Street Los Angeles, CA 90063 LOC ARCHITECTS SF Engineering 213-537-0480 Santa Ana, CA 92701 10/17/2024 24616 Los Angeles, CA 90025 310-386-2400 1801 E Chestnut Avenue TABLE OF CONTENTS 3 1 Table of Contents 2 Form NRCC-PLB-E Domestic Water Heating System 22 Form NRCC/LMCC-PRF-E Certificate of Compliance Cover Page CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 1 of 19) Project Name: Santa Ana Zoo -Building B Date Prepared: 2024-10-17 A. General Information 1 Project Name Santa Ana Zoo -Building B 2 Run Title Title 24 Analysis 3 Project Location 1801 E Chestnut Avenue 4 City Santa Ana 5 Standards Version Compliance 2022 6 Zip code 92701 7 Compliance Software (version)EnergyPro 9.3 8 Climate Zone 8 9 Building Orientation (deg)0 10 Building Type(s)• Nonresidential 11 Weather File COSTA-MESA-WAYNE_STYP20.epw 12 Project Scope • New envelope and mechanical 13 Number of Dwelling Units 0 14 Total Conditioned Floor Area in Scope (ft2)5602 15 Total # of hotel/motel rooms 0 16 Total Unconditioned Floor Area (ft2)0 17 Fuel Type Natural gas 18 Nonresidential Conditioned Floor Area 5602 19 Total # of Stories (Habitable Above Grade)2 20 Residential Conditioned Floor Area 0 CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 2 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 B. PROJECT SUMMARY Table B shows which building components are included in the performance calculation. If indicated as not included, the project must show compliance prescriptively if within the permit application. Building Components Complying via Performance Building Components Complying Prescriptively Envelope (See Table G) Nonres Performance Solar Thermal Water Heating (See Table I3) Performance The following building components are ONLY eligible for prescriptive compliance and should be documented on the NRCC form listed if within the scope of the permit application (i.e. compliance will not be shown on the NRCC-PRF-E).MultiFam Not Included Not Included Mechanical (See Table H) Nonres Performance Covered Process: Commercial Kitchens (see Table J) Performance Indoor Lighting (Unconditioned) 140.6 & 170.2(e) NRCC-LTI-E is required MultiFam Not Included Not Included Outdoor Lighting 140.7 & 170.2(e)NRCC-LTO-E is required Domestic Hot Water (See Table I) Nonres Performance Covered Process: Laboratory Exhaust (see Table J) Performance Sign Lighting 140.8 & 170.2(e)NRCC-LTS-E is required MultiFam Not Included Not Included Building Components Complying with Mandatory Measures Lighting (Indoor Conditioned, see Table K) Nonres Not Included Photovoltaics (see Table F) Performance Electrical power systems, commissioning, solar ready, elevator and escalator requirements are mandatory and should be documented on the NRCC form listed if applicable (i.e. compliance will not be shown on the NRCC-PRF-E.) MultiFam Not Included Not Included Electrical Power Distribution 110.11 NRCC-ELC-E is required Battery (see Table F) Performance Commissioning 120.8 NRCC-CXR-E is required Not Included Solar and Battery 110.10 NRCC-SAB-E is required CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 3 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 C1. COMPLIANCE SUMMARY COMPLIES3 Time Dependent Valuaton (TDV)Source Energy Use Efficiency1 (kBtu/ft2 - yr)Total2 (kBtu/ft2 - yr)Total2 (kBtu/ft2 - yr) Standard Design 179.89 81.43 9.97 Proposed Design 157.16 57.27 8.84 Compliance Margins 22.73 24.16 1.13 Pass Pass Pass 1 Efficiency measures include improvements like a better building envelope and more efficient equipment 2 Compliance Totals include efficiency, photovoltaics and batteries 3 New Construction, Complete Addition Scope: Building complies when all efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded Existing, Addition and Alteration Scope: Building complies when efficiency compliance margin is greater than or equal to zero and unmet load hour limits are not exceeded CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 4 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 C2. TDV ENERGY COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS (Annual TDV Energy Use, kBtu/ft 2 - yr) COMPLIES2 Energy Component Standard Design (TDV)Proposed Design (TDV)Compliance Margin (TDV)1 Space Heating 8.86 19.85 -10.99 Space Cooling 44.36 49.61 -5.25 Indoor Fans 94.12 56.37 37.75 Heat Rejection 0 0 0 Pumps & Misc.0 0 0 Domestic Hot Water 3.65 2.43 1.22 Indoor Lighting 28.9 28.9 0 Flexibility --------- EFFICIENCY COMPLIANCE TOTAL 179.89 157.16 22.73 (12.6%) Photovoltaics -94.21 -99.89 5.68 Batteries -4.25 ----4.25 TOTAL COMPLIANCE 81.43 57.27 24.16 (29.7%) 1 Notes: This number in parenthesis following the Compliance Margin in column 4, represents the Percent Better than Standard. CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 5 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 C3. TDV ENERGY RESULTS FOR NON-REGULATED COMPONENTS1 Non-Regulated Energy Component Standard Design (TDV)Proposed Design (TDV)Compliance Margin (TDV)1 Receptacle 44.55 44.55 --- Process --------- Other Ltg --------- Process Motors --------- TOTAL (TOTAL COMPLIANCE + NON-REGULATED COMPONENTS)125.98 101.82 24.16 (19.2%) 1 Notes: This table is not used for Energy Code Compliance. CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 6 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 C4. SOURCE ENERGY COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS (Annual SOURCE Energy Use, kBtu/ft 2 /yr) COMPLIES2 Energy Component Standard Design (SOURCE)Proposed Design (SOURCE)Compliance Margin (SOURCE)1 Space Heating 1.29 2.95 -1.66 Space Cooling 1.93 1.72 0.21 Indoor Fans 8.84 5.27 3.57 Heat Rejection 0 0 0 Pumps & Misc.0 0 0 Domestic Hot Water 0.32 0.27 0.05 Indoor Lighting 2.17 2.17 0 Flexibility --------- EFFICIENCY COMPLIANCE TOTAL 14.55 12.38 2.17 (14.9%) Photovoltaics -3.38 -3.54 0.16 Batteries -1.2 ----1.2 TOTAL COMPLIANCE 9.97 8.84 1.13 (11.3%) 1 Notes: This number in parenthesis following the Compliance Margin in column 4, represents the Percent Better than Standard. CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 7 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 C5. SOURCE ENERGY RESULTS FOR NON-REGULATED COMPONENTS1 Non-Regulated Energy Component Standard Design (SOURCE)Proposed Design (SOURCE)Compliance Margin (SOURCE)1 Receptacle 3.1 3.1 --- Process --------- Other Ltg --------- Process Motors --------- TOTAL ( TOTAL COMPLIANCE + NON-REGULATED COMPONENTS)13.07 11.94 1.13 (8.6%) 1 Notes: This table is not used for Energy Code Compliance. C6. 'ABOVE CODE' QUALIFICATIONS This project is pursuing CalGreen Tier 1 This project is pursuing CalGreen Tier 2 CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 8 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 C7. ENERGY USE SUMMARY Energy Component Standard Design Site (MWh) Proposed Design Site (MWh) Margin (MWh) Standard Design Site (MBtu) Proposed Design Site (MBtu) Margin (MBtu) Space Heating 1.6 3.6 -2 --------- Space Cooling 7.6 7.8 -0.2 --------- Indoor Fans 18.5 11.1 7.4 --------- Heat Rejection ------------------ Pumps & Misc.------------------ Domestic Hot Water 0.8 0.5 0.3 --------- Indoor Lighting 6.3 6.3 0 --------- Flexibility ------------------ EFFICIENCY TOTAL 34.8 29.3 5.5 0 0 0 Photovoltaics -23.2 -24.3 1.1 --------- Batteries 0.2 --------------- ENERGY USE SUBTOTAL 11.8 5 6.8 0 0 0 Receptacle 9.9 9.9 0 --------- Process ------------------ Other Ltg ------------------ Process Motors ------------------ ENERGY USE TOTAL 21.7 14.9 6.8 0 0 0 CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 9 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 C8. ENERGY USE INTENSITY (EUI) Standard Design (kBtu/ft2 / yr)Proposed Design (kBtu/ft2 / yr)Margin (kBtu/ft2 / yr)Margin Percentage GROSS EUI1 27.35 23.88 3.47 12.69 NET EUI1 13.22 9.08 4.14 31.32 1 Notes: Gross EUI is Energy Use Total (not including PV)/Total Building Area. Net EUI is Energy Use Total (including PV)/Total Building Area. D1. EXCEPTIONAL CONDITIONS • The aged solar reflectance and aged thermal emittance must be listed in the Cool Roof Rating Council database of certified products. For projects where initial reflectance is used, the initial reflectance must be listed, and the aged reflectance is calculated by the software program and used in the compliance model. • The project uses the Simplified Geometry Performance Modeling Approach which is not capable of modeling daylighting controls and assumes the prescriptive Secondary Daylit Control requirements are met. PRESCRIPTIVE COMPLIANCE documentation (form NRCC-LTI-02-E) for the requirements of section 140.6(d) Automatic Daylighting Controls in Secondary Daylit Zones is required. • Required minimum PV capacity limited by SARA. E4. ADDITIONAL REMARKS This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. Standard Building (Compliance) F1. REQUIRED PV SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 12 DC System Size (kWdc)Exception1 Module Type Array Type Power Electronics CFI Azimuth (deg)Tilt Input Array Angle (deg)Tilt: (x in 12)Inverter Eff. (%) Annual Solar Access (%) 14 Standard (14-17%)Fixed none false 180 Degrees 22 4.85 96 100 1See Table D1 for any PV exceptions used. CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 10 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 F1B. PV BATTERY BUILDING TYPE(S) 01 02 03 Building Occupancy Type*(From Table 140.10-A/B and 170.2-U/V)Conditioned Floor Area (ft2)Unconditioned Floor Area (ft2) Grocery 0 0 High-Rise Multifamily 0 0 Office, Financial Institutions, Unleased Tenant Space 5602 0 Retail 0 0 School 0 0 Warehouse 0 0 Auditorium, Convention Center, Hotel/Motel, Library, Medical Office Building/Clinic, Restaurant, Theater 0 0 None 0 0 *Building Occupancy Types are defined in Section 100.1 of the Energy Code G1. ENVELOPE GENERAL INFORMATION (conditioned spaces only) 01 02 03 04 Opaque Surfaces & Orientation Total Gross Surface Area (ft2)Total Fenestration Area (ft2)Window to Wall Ratio (%) North-Facing1 871 51 5.86 East-Facing2 1876 271.5 14.47 South-Facing3 1020 67.5 6.62 West-Facing4 1363 164.5 12.07 Total 5130 554.5 10.81 Roof 3648 0 0 Notes 1North-Facing is oriented to within 45 degrees of true north, including 45 00'00" east of north (NE), but excluding 45 00'00" west of north (NW), 2East-Facing is oriented to within 45 degrees of true east, including 45 00'00" south of east (SE), but excluding 45 00'00" north of east (NE), 3South-Facing is oriented to within 45 degrees of true south, including 45 00'00" west of south (SW), but excluding 45 00'00" east of south (SE), 4West-Facing is oriented to within 45 degrees of true west, including 45 00'00" north of west (NW), but excluding 45 00'00" south of west (SW), CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 11 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 G2A. ROOFING PRODUCT SUMMARY (NONRESIDENTIAL) 01 02 03 04 05 06 Assembly Name Roof Pitch Roof Rise (x in 12)Aged Solar Reflectance Thermal Emittance SRI R-30 Roof38 LowSlope N/A 0.53 0.88 N/A G4. NONRESIDENTIAL AIR BARRIER 01 02 Building Story Name Air Barrier Com-Floor 1 No air barrier Com-Floor 2 No air barrier CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 12 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 G5. OPAQUE SURFACE ASSEMBLY SUMMARY 01 02 03 04 05 06 07 08 09 10 Surface Name Construction Type Area (ft2)Framing Type Cavity R-Value Continuous R-Value Units Value Description of Assembly Layers Status1 Interior Exterior Metal frame 2x8 wall - 248 Exterior Wall 3,751 Metal 22 N/A N/A U-factor 0.149 Stucco - 7/8 in. Vapor permeable felt - 1/8 in. Composite-1 Gypsum Board - 1/2 in. N Slab On Grade13 Underground Floor 1,954 N/A 0 N/A N/A F-factor 0.73 Slab Type =Unheated slab on grade Insulation Orientation =None Insulation R-Value =none N R-21 Wall15 Exterior Wall 1,379 Wood 21 N/A N/A U-factor 0.0691 Stucco - 7/8 in. Vapor permeable felt - 1/8 in. Composite-2 Gypsum Board - 1/2 in. N R-0 Wall Metal Stud18 Interior Wall 2,070 Metal 0 N/A N/A U-factor 0.3713 Stucco - 7/8 in. Vapor permeable felt - 1/8 in. Composite-3 Gypsum Board - 1/2 in. N Uninsulated Raised Slab F36 Exterior Floor 2,320 N/A 0 N/A 0.1 U-factor 0.2584 Compliance Insulation R0.10 Concrete - 140 lb/ft3 - 4 in. Carpet - 3/4 in. N R-30 Roof38 Roof 3,648 N/A 30 N/A N/A U-factor 0.072 Metal Standing Seam - 1/16 in. Composite-4 N R-0 Floor - Metal47 Interior Floor 1,328 N/A 0 N/A N/A U-factor 0.2203 Plywood - 1/2 in. Carpet - 3/4 in.N 1 Status: N - New, A - Altered, E - Existing CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 13 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 G6A. OPAQUE DOOR SUMMARY (NONRESIDENTIAL) 01 02 03 04 Assembly Name Area (ft2)Overall U-factor Status1 Hollow Metal Door11 88 0.7 N Insulated Metal Door24 42 0.5 N 1 Status: N - New, A - Altered, E - Existing G7A. FENESTRATION ASSEMBLY SUMMARY (NONRESIDENTIAL) 01 02 03 04 05 06 07 08 09 Fenestration Assembly Name Fenestration Type/ Product Type / Frame Type Certification Method1 Assembly Method Area (ft2) Overall U-factor Overall SHGC Overall VT Status2 Dual glazing Low E glass Vertical fenestration Fixed window N/A NFRC Manufactured 554.5 0.36 0.25 0.5 N 1 Notes: Newly installed fenestration shall have a certified NFRC Label Certificate or use the CEC default tables found in Table 110.6-A and Table 110.6-B. Center of Glass (COG) values are for the glass-only, determined by the manufacturer, and are shown for ease of verification. Site-built fenestration values are calculated per Nonresidential Appendix NA6 and are used in the analysis. 2 Status: N - New, A - Altered, E - Existing G8. OVERHANG DETAILS 01 02 03 04 05 06 07 Fenestration Tag/ ID Azimuth Depth (ft)Height from Top of Sill to Overhang (ft)Right Extent (ft)Left Extent (ft)Flap Height Window16 270 10 7.1 10 10 N/A Window20 90 6 10.1 6 6 N/A CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 14 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 H1. DRY SYSTEM EQUIPMENT (FURNACES, AIR HANDLING UNITS, HEAT PUMPS, VRF, ECONOMIZERS ETC.) 01 02 03 04 05 06 07 08 09 10 11 12 Equipment Name Equipment Type Qty Heating Cooling Economizer Type (if present) Status1Total Heating Output (kBtu/h) Supp Heat Output (kBtu/h) Efficiency Unit Efficiency Total Cooling Output (kBtu/h) Efficiency Unit Efficiency CAC-1 Single Zone Heat Pump (SZHP) Air System 1 12.5 0 COP HSPF 3.25 8.2 11.52 EER SEER 11 14 No Economizer N HP-2 Variable Refrigerant Flow 1 270 N/A COP 3.2 240 EER 10.6 N/A N 1 Status: N - New, A - Altered, E - Existing CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 15 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 H3. NONRESIDENTIAL / COMMON USE AREA FAN SYSTEMS SUMMARY 01 02 03 04 05 06 07 08 09 10 11 12 13 Name or Item Tag Qty Design OA CFM Supply Fan Return / Relief Fan Status1 CFM Power Power Units Control Fan Type CFM Power Power Units Control CAC-1 1 0 400 0.06 BHP Constant Vol N/A N/A N/A N/A N/A N 2-Material Storage (108) W-VRF 2 70.2 1,200 0.25 BHP Constant Vol N/A N/A N/A N/A N/A N 3-Restrooms Hub 106 Stair-VRF 1 152.7 1,200 0.25 BHP Constant Vol N/A N/A N/A N/A N/A N 4-Offices 203 208-VRF 1 88.65 1,200 0.25 BHP Constant Vol N/A N/A N/A N/A N/A N 5-Medium Office (202) Hub-VRF 1 59.4 353 0.04 BHP Constant Vol N/A N/A N/A N/A N/A N 6-Meeting room (207)-VRF 1 26.25 353 0.04 BHP Constant Vol N/A N/A N/A N/A N/A N 7-Hub 201 staff restroom-VRF 1 163.2 250 0.25 BHP Constant Vol N/A N/A N/A N/A N/A N 8-Offices 209-214-VRF 1 112.95 1,200 0.25 BHP Constant Vol N/A N/A N/A N/A N/A N 9-Food Prep-VRF 1 0 1,200 0.25 BHP Constant Vol N/A N/A N/A N/A N/A N 10-Shared office (218)-VRF 1 39.6 1,200 0.25 BHP Constant Vol N/A N/A N/A N/A N/A N 1 Status: N - New, A - Altered, E - Existing H5. GENERAL EXHAUST FAN SUMMARY 01 02 03 04 05 06 07 08 System ID Zone Name Qty CFM Power Power Units Continuous Operation?Status1 Food Prep65-EF 8-Food Prep 1 100 0.15 BHP No N 1 Status: N - New, A - Altered, E - Existing CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 16 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 H8. SYSTEM SPECIAL FEATURES 01 02 03 04 System Name Equipment Type Interlocks per 140.4(n)1 Other Special Features and Controls HP-2 Variable Refrigerant Flow N/A Heat Recovery Plant - DHW1 - SHW Service Hot Water N/A Fixed Temperature Control Notes: This table includes controls related to the performance path only. For projects using the prescriptive path, mandatory and prescriptive controls requirements are documented on the NRCC-MCH-E. 1 Yes = interlocks are provided, No = interlocks are not provided, NA means no operable openings. H9. NONRESIDENTIAL / COMMON USE AREA & HOTEL/MOTEL VENTILATION 01 02 03 04 05 06 07 Zone Name Mechanical Ventilation Conditioned Area (sf)DCV or Occupant Sensor Controls, or BothVentilation Function # of People Supply OA CFM Exhaust CFM 1-Material Storage (108) W General - Corridors 4.68 140.4 0 936 N/A 2-Restrooms Hub 106 Stair General - Corridors 5.09 152.7 0 1018 N/A 3-Offices 203 208 Office - Office space 2.96 88.65 0 591 N/A 4-Medium Office (202) Hub Office - Office space 1.98 59.4 0 396 N/A 5-Meeting room (207)Office - Office space 0.88 26.25 0 175 N/A 6-Hub 201 staff restroom General - Corridors 5.44 163.2 0 1088 N/A 7-Offices 209-214 Office - Office space 3.77 112.95 0 753 N/A 8-Food Prep General - Corridors 1.6 48 100 320 N/A 9-Shared office (218)Office - Office space 1.32 39.6 0 264 N/A 10-IT Closet Exhaust - Refrigerating machinery rooms 0.09 0 0 61 N/A CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 17 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 H11. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY 01 02 03 04 05 06 07 08 09 10 11 12 System ID System Type Qty Rated Capacity (kBtuh)Airflow (cfm)Fan VSD Heating Cooling Design MIn.Min. Ratio Power Power Units Cycles 10-IT Closet-Trm Uncontrolled 1 N/A N/A 400 N/A 0 N/A N/A N/A 2-Material Storage (108) W-VRF Variable Refrigerant Flow 2 36 32 1,200 N/A N/A 0.25 BHP Continuous 3-Restrooms Hub 106 Stair-VRF Variable Refrigerant Flow 1 54 48 1,200 N/A N/A 0.25 BHP Continuous 4-Offices 203 208-VRF Variable Refrigerant Flow 1 20 18 1,200 N/A N/A 0.25 BHP Continuous 5-Medium Office (202) Hub-VRF Variable Refrigerant Flow 1 13.5 12 353 N/A N/A 0.04 BHP Continuous 6-Meeting room (207)-VRF Variable Refrigerant Flow 1 13.5 12 353 N/A N/A 0.04 BHP Continuous 7-Hub 201 staff restroom-VRF Variable Refrigerant Flow 1 9 8 250 N/A N/A 0.25 BHP Continuous 8-Offices 209-214-VRF Variable Refrigerant Flow 1 36 32 1,200 N/A N/A 0.25 BHP Continuous 9-Food Prep-VRF Variable Refrigerant Flow 1 20 18 1,200 N/A N/A 0.25 BHP Continuous 10-Shared office (218)-VRF Variable Refrigerant Flow 1 20 18 1,200 N/A N/A 0.25 BHP Continuous I1. WATER HEATER EQUIPMENT SUMMARY 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Name Heater Element Type Tank Type Qty Tank Vol (gal) Rated Input Rated Input Unit Efficiency Efficiency Unit Tank Insulation R-value Int/Ext Standby Loss Fraction 1st Hr. Rating or Flow Rate (gal) Heat Pump Type Tank Location or Ambient Condition Rheem PROPH65 T2 RH375-152 Electricity Storage 1 65 4.5 kW 3.8 UEF N/A N/A 0 Heat Pump Split Water Heater N/A CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 18 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 L. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION Selections made by Documentation Author indicate which Certificates of Installation must be submitted for the features to be recognized for compliance. These documents must be retained and provided to the building inspector during construction and can be found online Building Component Form/Title Envelope NRCI-ENV-01-E - Must be submitted for all buildings Envelope NRCI-ENV-E - Envelope (for all buildings) Mechanical NRCI-MCH-01-E - Must be submitted for all buildings Mechanical NRCI-MCH-E - For all buildings with Mechanical Systems Plumbing NRCI-PLB-01-E - Must be submitted for all buildings Plumbing NRCI-PLB-E - For all buildings with Plumbing Systems NRCI-SAB-E - Solar Water Heating, PV and Battery Storage Systems M. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE Selections made by Documentation Author indicate which Certificates of Acceptance must be submitted for the features to be recognized for compliance. These documents must be provided to the building inspector during construction and must be completed through an Acceptance Test Technician Certification Provider (ATTCP). Building Component Form/Title & System Name(s) Envelope NRCA-ENV-02-F - NRFC label verification for fenestration Mechanical NRCA-MCH-02-A - Outdoor Air must be submitted for all newly installed HVAC units. Note: MCH-02-A can be performed in conjunction with MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities overlap CAC-1 Mechanical NRCA-MCH-03-A - Constant Volume Single Zone HVAC CAC-1 N. DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION Selections made by Documentation Author indicate which Certificates of Verification must be submitted for the features to be recognized for compliance. These documents must be retained and provided to the building inspector during construction and can be found online There are no Certificates of Verification applicable to this project CERTIFICATE OF COMPLIANCE - NONRESIDENTIAL PERFORMANCE COMPLIANCE METHOD NRCC-PRF-E Nonresidential Performance Compliance Method (Page 19 of 19) CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220601 Report Generated: 2024-10-17 11:42:39 Compliance ID: EnergyPro-1339-1024-0064 Documentation Author's Declaration Statement 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Signature Date:Company: SF Engineering Address: 11041 Santa Monica Blvd #509 CEA/HERS Certification Identification (if applicable): City/State/Zip: Los Angeles, CA 90025 Phone: 310-386-2400 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Compliance is true and correct. 2.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer) 3.The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5.I understand that a registered copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections, and I will take the necessary steps to accomplish this requirement. 6.I understand that a registered copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy, and I will take the necessary steps to accomplish these requirements. Responsible Designer Name:Responsible Designer Signature: Company: LOC ARCHITECTS Address: 3203 East 4th Street Date Signed: City/State/Zip: Los Angeles, CA 90063 License #: Phone: 213-537-0480 Title:Scope: Responsible Designer Name: Shahram Farzan Responsible Designer Signature: Company: SF Engineering Address: 11041 Santa Monica Blvd, Suite 509 Date Signed: City/State/Zip: Los Angeles, CA 90025 License #: M-24912 Phone: (310) 386-2400 Title:Scope:   Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0116 Report Generated: 2024-10-17 11:44:13 STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E This document is used to demonstrate compliance for nonresidential occupancies with requirements in 110.1, 110.3, 120.3, and 140.5, and with requirements in 141.0 for additions and alterations, for domestic water heating scopes using the prescriptive path. For high-rise residential and hotel/motel occupancies compliance is demonstrated with requirements in 110.1, 110.3, 160.4 and 170.2(d), and with requirements 180.1 for additions and 180.2 for alterations. Project Name: Santa Ana Zoo -Building B Report Page: (Page 1 of 7) Project Address: 1801 E Chestnut Avenue Date Prepared: 10/17/2024 A. GENERAL INFORMATION 01 Project Location (city)Santa Ana 02 Climate Zone 8 03 Occupancy Types Within Project (select all that apply): ● Office ● Support Areas ● All Other Occupancies B. PROJECT SCOPE This table includes domestic water heating systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive paths outlined in 140./ 170.2(d) and 141.0(a)/ 180.1, or 141.0(b)2N / 180.2 for additions or alterations. Solar water heating systems are documented on the NRCC-SAB compliance document. Combined hydronic water heating systems are documented on the NRCC-MCH compliance document. 01 02 03 My project consists of (check all that apply):System Type1,2 System Components New system (DHW system being installed for the first time)Individual System (serving nonresidential spaces)Equipment Distribution Controls System Alteration (equipment, distribution or controls)Equipment Distribution Controls 1FOOTNOTES: Point of use water heaters, or other non-central systems used to serve nonresidential spaces, are considered individual systems. 2 Dwelling units refers to hotel/motel guest rooms and units in a multifamily residential occupancy. 3 DHW systems serving 2 or more dwelling units are considered "Central Systems" for multifamily occupancies C. COMPLIANCE RESULTS Table C will indicate if the project data input into the compliance document is compliant with water heating requirements. If this table says "DOES NOT COMPLY" or "COMPLIES with Exceptional Conditions" refer to Table D. or the table indicated as not compliant for guidance. 01 02 03 04 Domestic Hot Water Equipment Distribution Systems Controls Compliance ResultsTable F Table G Table H Yes Yes Yes COMPLIES D. EXCEPTIONAL CONDITIONS This table is auto-filled with uneditable comments because of selections made or data entered in tables throughout the form. STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building B Report Page: (Page 2 of 7) Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0116 Report Generated: 2024-10-17 11:44:13 E. ADDITIONAL REMARKS This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building B Report Page: (Page 3 of 7) Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0116 Report Generated: 2024-10-17 11:44:13 F. DOMESTIC HOT WATER EQUIPMENT This table is used to demonstrate compliance with mandatory equipment requirements in 110.1 and 110.3. Compliance with prescriptive requirements in 140.5(c) / 170.2(d) must also be demonstrated and with 141.0 / 180.1/ 180.2 for addition and alteration scopes. Equipment Schedule: Water Heating Efficiency and Standby Loss 03 04 05 06 System Name Rheem PROPH65 T2 RH375-15 (50 gal, JA13) Exception to 140.5(c)/ 170.2(d)3   Gas Service Water Heating System >= 1MMBtu/h1 Capacity-weighted Average Efficiency %  07 08 09 10 11 12 13 14 15 Name or Item Tag Equipment Type Volume (gal) Rated Input Capacity (Btu/h) Max GPM/ First Hour Rating (FHR) Rated Efficiency Minimum Efficiency Required Efficiency Unit Designed Standby Loss Maximum Standby Loss Rheem PROPH65 T2 RH375-15 (50 gal, JA13) Heat Pump Water Heater 65 15,354 0 <= FHR <18 3.8 2 UEF    1FOOTNOTE: In systems >= 1MMBtu/h with multiple units, gas water heaters with input capacity > 100,000 Btu/h may meet 90% Et requirements via an input capacity-weighted average. Water Heating Equipment All Occupancies Yes No Not Applicable Requirement 18 Unfired storage tank insulation shall have Internal + External >=R-16 OR External >=R-3.5. Label required per 110.3(c)3 19 New state buildings 60% of energy for service water heating from site solar energy or recovered energy per 110.3(c)5 20 Isolation valves for instantaneous water heater with input rating >6.8 kBTUH or 2 kW has been specified per 110.3(c)6 21 School buildings < 25,000 ft2 and < 4 stories must install a heat pump water heating system per 140.5(a)1. Water heating systems serving an individual bathroom space may be an instantaneous electric water heater. STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building B Report Page: (Page 4 of 7) Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0116 Report Generated: 2024-10-17 11:44:13 G. DOMESTIC HOT WATER DISTRIBUTION SYSTEM This table is used to demonstrate compliance for nonresidential occupancies with distribution requirements in 120.3 and 140.5. For multifamily and hotel/motel occupancies, compliance is demonstrated with requirements 110.3(c), 160.4, 170.2(d). Mandatory Pipe Insulation All Occupancies 13 For systems serving dwelling units, pipe insulation must meet the minimum insulation requirements in Table 160.4-A (see blow) except: •Piping that penetrates framing members shall not be required to have pipe insulation for the distance of the framing penetration. Piping that penetrates metal framing shall use grommets, plugs, wrapping or other insulating material to assure that no contact is made with the metal framing. Insulation shall abut securely against all framing members •Piping installed in interior or exterior walls shall not be required to have pipe insulation if all of the requirements are met for compliance with Quality Insulation Installation (QII) as specified in the Reference Residential Appendix RA3.5. •Piping surrounded with a minimum of 1 inch of wall insulation, 2 inches of crawlspace insulation, or 4 inches of attic insulation, shall not be required to have pipe insulation. 14 For systems serving nonresidential spaces, pipe insulation for the following applications is specified to comply with Table 120.3-A (see below) per 120.3: •Recirculating system piping, including supply and return piping of the water heater •The first 8 ft of hot and cold outlet piping, including between storage tank and heat trap, for a nonrecirculating storage system •Pipes that are externally heated 15 Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation exposed to weather shall be installed with a cover suitable for outdoor service per 120.3(b) / 160.4(f). Pipe insulation buried below grade must be installed in a water proof and non-crushable casing or sleeve. TABLE 120.3-A / 160.4-A PIPE INSULATION THICKNESS Fluid Temperature Range ( °F) Conductivity Range (Btu-in per hour per ft2 per °F) Insulation Mean Rating Temp ( °F) Nominal Pipe Diameter (in) < 1 1 to < 1.5 1.5 to < 4 1.5 to < 4 Multifamily & Hotel/Motel Minimum Insulation Required 105-140 0.22 - 0.28 100 1.0 in or R-7.7 1.5 in or R-12.5 1.5 in or R-11 2.0 in or R-16 STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building B Report Page: (Page 5 of 7) Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0116 Report Generated: 2024-10-17 11:44:13 H. DOMESTIC HOT WATER CONTROLS This table is used to demonstrate compliance with control requirements in 110.3 for all occupancies. For multifamily residential and hotel/motel occupancies, compliance is also demonstrated with requirements in 160.4(e) / 170.2(d). Yes No Not Applicable Requirement 01 Construction documents require manufacturer certification that service water-heating systems are equipped with automatic temperature controls capable of adjusting temperature settings per 110.3(a). 02 Systems with capacity > 167,000 BTUH equipped with outlet temperature controls per 110.3(c)1 unless covered by California Plumbing Code 613.0. 03 Controls for circulating pumps or electrical heat trace systems are capable of automatically turning off the system per §110.3(c)2  unless systems serves healthcare facility. 04 For recirculation systems serving multiple dwelling units, design includes automatic pump controls per 170.2(d) or 180.1(b)3 for additions. 05 For recirculation systems serving individual dwelling units, design includes manual on/off controls as specified in Reference Appendix RA4.4.9 per 170.2(d). 06 Combustion air positive shut-off shall be provided per 160.4(3).on all newly installed commercial boilers as follows: •Boilers with input capacity >= 2.5 MMBtu/h, in which the boiler is designed to operate with a nonpositive vent static pressure •Boilers where one stack serves two or more boilers with a total combined input capacity per stack of 2.5 MMBtu/h. 07 Boiler combustion air fans with motor >= 10 hp shall meet one of the following •The fan motor shall be driven by a variable speed drive OR •The fan motor shall include controls that limit the fan motor demand to <=30% of the total design wattage at 50% of the design air volume. 08 Newly installed boilers with an input capacity {d:gte/] 5MMBtu/h and a steady state full-load combustion efficiency < 90% shall maintain excess (stack-gas) oxygen concentrations <= 5% by volume on a dry basis over firing rates of 20-100%. Combustion air volume shall be controlled with respect to firing rate or flue gas oxygen concentration. Use of a common gas and combustion air control linkage or jack shaft is prohibited. STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building B Report Page: (Page 6 of 7) Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0116 Report Generated: 2024-10-17 11:44:13 I. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION Selections have been made based on information provided in this document. If any selection have been changed by permit applicant, an explanation should be included in Table E. Additional Remarks. These documents must be provided to the building inspector during construction and can be found online Form/Title NRCI-PLB-E - Must be submitted for all buildings J. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE There are no forms required for this project. K. DECLARATION OF REQUIRED CERTIFICATES OF VERIFICATION There are no forms required for this project. STATE OF CALIFORNIA Domestic Water Heating System CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-PLB-E Project Name: Santa Ana Zoo -Building B Report Page: (Page 7 of 7) Project Address: 1801 E Chestnut Avenue Date Prepared: 10/17/2024 Generated Date/Time:Documentation Software: EnergyPro CA Building Energy Efficiency Standards - 2022 Nonresidential Compliance Report Version: 2022.0.000 Schema Version: rev 20220101 Compliance ID: EnergyPro-1339-1024-0116 Report Generated: 2024-10-17 11:44:13 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Company: SF Engineering Signature Date: 2024-10-17 Address: 11041 Santa Monica Blvd #509 CEA/ HERS Certification Identification (if applicable): City/State/Zip: Los Angeles CA 90025 Phone: 310-386-2400 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Compliance is true and correct. 2.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer) 3.The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5.I will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Shahram Farzan Responsible Designer Signature: Company: SF Engineering Date Signed: 2024-10-17 Address: 11041 Santa Monica Blvd, Suite 509 License: M-24912 City/State/Zip: Los Angeles CA 90025 Phone: (310) 386-2400