HomeMy WebLinkAbout625 S Cypress Ave - Plan25
JEN DUNBAR, AIA
ARCHITECT OF RECORD
DUNBAR ARCHITECTURE
Phone: 310-435-2938
Address: 12314 La Maida Street
Valley Village, CA 91607
Email: jen@dunbararchitecture.com
4/7/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
4/
7
/
2
0
2
5
9
:
2
0
:
5
4
P
M
T0.00
COVER SHEET
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
VICINITY MAP
CLIENT:
City of Santa Ana
Robert Aguirre, PE, Senior Civil Engineer
Phone: 714-647-5652
Address: Public Works Agency
Email: raguirre@santa-ana.org
Victor Rosales, Assistant Parks/ Landscape Planner
Phone: 714-647-5686
Address: Public Works Agency
Email: vrosales@santa-ana.org
ARCHITECT OF RECORD:
Dunbar Architecture
Jen Dunbar, AIA
Phone: 310-435-2938
Address: 12314 La Maida Street
Valley Village, CA 91607
Email: jen@dunbararchitecture.com
Ashley Powell, AIA, CASp
Phone: 909-615-3195
Email: ashley.powell@dunbararchitecture.com
CONSULTANT:
Structural Engineer:
Holmes
Justin Sharkey, PE
Phone: 213.451.4404
Email: justin.sharkey@holmes.us
MEP Engineer:
MEP CALIFORNIA ENGINEERING CORP
Henrik Hertz, Principal
Phone: 206.250.8479
Email: henrik@mepcal.com
Civil Engineer:
KPFF
Casey Rasile, PE, QSD/QSP
Phone: 562.437.9100
Address: 400 Oceangate, Ste 500
Long Beach, CA 90802
Email: casey.rasile@kpff.com
Surveyor:
CAL VADA SURVEYING, INC.
Armando DuPont, PLS
Phone: 951.280.9960
Address: 411 Jenks Circle, Suite 205
Corona, CA 92878
Email:
Landscape Architect:
Naomi Sanders
Phone: 323.336.3889
Email:naomi@naomisanders.com
BACKCHECK SET_V2
4/8/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
CYPRESS CENTER
RESTORATION
PROJECT DESCRIPTION
THE PROJECT CONSISTS OF AN EXTERIOR RESTORATION AND
REHABILITATION OF THE 1928 FIRE STATION DESIGNED BY LOCAL SANTA ANA
ARCHITECT FREDERICK ELEY. THE BUILDING IS A DESIGNATED HISTORIC
RESOURCE FOR THE CITY OF SANTA ANA.
EXTERIOR WORK WILL INCLUDE THE REMOVAL OF THE NON-CONTRIBUTING
AND NON-ORIGINAL CAR PORT AT THE REAR OF THE BUILDING AND RETURN
THE BUILDING TO ITS ORIGINAL FOOTPRINT. THE FRONT ENTRY ENGINE BAYS
ARE TO BE RETURNED TO THE ORIGINAL CONFIGURATION INCLUDING
RECREATING THE DOUBLE DOORS IN EACH BAY. THE PROJECT WILL
PRESERVE, REPAIR, AND RESTORE THE ORIGINAL CLAY TILE ROOF, STUCCO
EXTERIOR, INLAID DECORATIVE TILES, DECORATIVE IRON WORK, AND DOORS
AND WINDOWS.
INTERIOR WORK WILL CONSIST OF ADDING NEW ACCESSIBLE AND CODE
COMPLIANT RESTROOMS AND INTERIOR SPACES FOR COMMUNITY OUTREACH
PROGRAMS AND TUTORING AND ADMINISTRATIVE OFFICE.
PROJECT DIRECTORYPLOT PLAN PROJECT INFORMATION
OWNER: CITY OF SANTA ANA
LOT/LOCATION:625 S. CYPRESS AVE.
SANTA ANA, CA 92701
YEAR BUILT: 1928
ASSESSOR'S PARCEL #: 404-102-06
Block: 3 Lot: 11
ZONING: R2 -TWO-FAMILY RESIDENCE
GENERAL PLAN:LR-7 LOW DENSITY RESIDENTAIL 7DU/AC
SITE AREA: 0.17 ACRES
7,501 SQ FT
BUILDING OCCUPANCY TYPE: A-3, B
BUILDING CONSTRUCTION TYPE: TYPE V-B
SPRINKLERS: EXISTING = NONE
FIRE ALARM:NOT REQUIRED PER CBC 907.2 DUE TO
OCCUPANCY LOADS
BUILDING HEIGHT/STORIES:(E) 1 STORY
(E) 20'-11"
BUILDING AREA:ALLOWABLE:
A-3 = 6,000 SQ FT
B = 9,000 SQ FT
NONSEPARATED OCCUPANCY, THEREFORE
6,000 SQ FT MAX ALLOWABLE AREA
EXISTING: NO NEW SQ FT PROPOSED
3,490 SQ FT
3,490 SQ FT < 6,000 SQ FT, THEREFORE OK
PARKING:NO ONSITE PARKING IS PROVIDED
BUILDING OCCUPANCY:207 OCCUPANTS TOTAL, REFER TO T2.00 FOR
EGRESS PLAN
<300 OCCUPANTS, THEREFORE HIGHER RISK
CATEGORY IS NOT REQUIRED
FIRE SEPARATION DISTANCE:NORTH SIDE: (E) 3'-0" -3'-11"
SOUTH SIDE: (E) 4'-10" -5'-3"
PER CBC TABLE 705.5, A 1-HR FIRE-
RESISTANCE RATING IS REQUIRED ALONG
THE EXTERIOR WALLS ALONG GRIDLINE 1
AND 3.
(E) EXTERIOR WALLS WILL BE MODIFIED TO
1-HOUR RATED.
FOR THE EXTERIOR OPENING PROTECTION,
EXTERIOR SPRINKLERS INSTALLED OVER
EACH OPENING WILL BE PROVIDED PER
CHBC 8-402.1
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
APPLICABLE CODES
THE SECRETARY OF THE INTERIOR STANDARD AND ILLUSTRATED GUIDELINES
FOR REHABILITATING HISTORIC BUILDINGS, REVISED 1992 *36CFR 67), P.L
89-665.
CALIFORNIA CODE OF REGULATIONS TITLE 24, 2022 CALIFORNIA BUILDING
CODE, INCLUDING:
PART 2 CALIFORNIA BUILDING CODE (CBC), VOLUMES 1 & 2
PART 3 CALIFORNIA ELECTRICAL CODE
PART 4 CALIFORNIA MECHANICAL CODE
PART 5 CALIFORNIA PLUMBING CODE
PART 6 CALIFORNIA ENERGY CODE
PART 8 CALIFORNIA HISTORICAL BUILDING CODE
PART 9 CALIFORNIA FIRE CODE
PART 10 CALIFORNIA EXISTING BUILDING CODE
PART 11 CALIFORNIA GREEN BUILDING STANDARDS CODE
ACCESSIBILITY REQUIREMENTS ARE GOVERNED BY:
2022 CBC, CHAPTER 11B
AMERICANS WITH DISABILITIES ACT (ADA) AND THE 2010 ADA
STANDARDS FOR ACCESSIBLE DESIGN
DEFERRED SUBMITTALS
• LOCALIZED EXTERIOR FIRE SPRINKLER SYSTEM OVER EXTERIOR
OPENINGS IN COMPLIANCE WITH CHBC 8-402.1.
FIRE SPRINKLER SHALL BE INSTALLED PRIOR TO FINAL INSPECTION. ALL
PIPING TO BE INTERNAL, SPRINKLER HEADS TO BE EXTERNAL.
Bldg #101120230
Elect #20183537
Plumb #30147573
Mech #40139358
APPROVALS:
PLNG - A Heywood
BLDG - T. LePOLICE - B. Martin
PUBLCI WORKS - Y. Soto
ELECT - M. Smith
MECH/PLUMB - T. Luka
1 View Name
1/8" = 1'-0"A0.00
?
Room name
101
1
A101
SIM
1i
xx
A101
1
SIM
00
A101
1
1 1
1
A101
1
1
1
1
ROOM TAG
VIEW TITLE
REFERENCE DETAIL
ROOM NAME
ROOM NUMBER
VIEW ON SHEET
VIEW NAME
SHEET
SCALE
KEYNOTE
KEYNOTE NUMBER
WALL TAG
WINDOW TAG
DOOR TAG
WALL TYPE
WINDOW NUMBER
DOOR NUMBER
SECTION
EXTERIOR ELEVATION
INTERIOR ELEVATION
DIRECTION OF
VIEW CUT
SHEET
VIEW ON SHEET
SHEET
VIEW ON SHEET
DIRECTION OF VIEW
SHEET
VIEW ON SHEET
DIRECTION OF VIEW
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
1/4" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
0
:
5
6
P
M
T0.01
GENERAL NOTES
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
GREEN NOTES (CAL GREEN)
1. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS. NOTIFY THE ARCHITECT IMMEDIATELY OF
VARIATIONS OR DISCREPANCIES. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY
THE ARCHITECT.
2. ALL CONSTRUCTION AND INSTALLATION WORK SHOWN ON DRAWINGS SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE CODES AND
ORDINANCES. USE METHODS AS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF ALL PREVAILING LAWS AND CODES.
3. DO NOT SCALE DRAWINGS: USE DIMENSIONS SHOWN. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS SHOWN AT (E)
CONDITIONS ARE TO FACE OF (E) FINISH. U.O.N. DIMENSIONS AT NEW WORK ARE TO FACE OF FRAMING, U.O.N. DIMENSIONS OF (E)
CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED
CONSULT WITH THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
4. SAFETY MEASURES: AT ALL TIMES THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CONDITIONS AT THE JOB SITE, INCLUDING
SAFETY OF PEOPLE AND PROPERTY. ARCHITECT'S SITE VISITS ARE NOT INTENDED TO REVIEW THE ADEQUACY OF THE CONTRACTOR'S
SAFETY MEASURES.
5. INSTALL MANUFACTURED MATERIALS AND EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS, UNLESS
OTHERWISE INSTRUCTED.
6. ALL WASTE AND REFUSE CAUSED IN CONNECTION WITH THE WORK SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF BY THE
CONTRACTOR. THE PREMISES SHALL BE LEFT CLEAR AND CLEAN TO THE SATISFACTION OF THE ARCHITECT AND OWNER'S
REPRESENTATIVE.
7. APPLICATION OF FINISH: SURFACES PREVIOUSLY PREPARED OR INSTALLED BY ANOTHER TRADE SHALL BE INSPECTED CAREFULLY BY THE
CONTRACTOR BEFORE APPLYING SUBSEQUENT MATERIALS OR FINISHES. IF SURFACES ARE NOT ACCEPTABLE, THE ARCHITECT SHALL BE
NOTIFIED IMMEDIATELY IN ORDER THAT CORRECTIONS MAY BE MADE. APPLICATIONS OF FINISHES WILL BE CONSTRUED AS ACCEPTANCE OF
RESPONSIBILITY BY THE SUBCONTRACTOR FOR THE BASE UPON WHICH IT IS APPLIED.
8. INSTALL ALL WORK PLUMB, LEVEL AND STRAIGHT, OR AS REQUIRED TO ALIGN WITH (E) ADJACENT SURFACES.
9. CONTRACTOR SHALL DESIGN AND INSTALL SHORING AS REQUIRED TO PERFORM WORK. RESPONSIBILITY FOR ENGINEERING,
CONSTRUCTION, AND SAFETY OF THE SHORING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
10. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLEMENTARY.
CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE DRAWINGS, SPECIFICATIONS, NOTES AND DETAILS SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT AND RESOLVED BEFORE PROCEEDING WITH WORK.
11. DETAILS SHOWN SHALL BE INCORPORATED INTO THE PROJECT AT ALL APPROPRIATE LOCATIONS WHETHER SPECIFICALLY CALLED OUT OR
NOT.
12. THE CONTRACTOR MUST SUBMIT IN WRITING ANY REQUESTS FOR MODIFICATIONS TO THE PLANS AND SPECIFICATIONS. SHOP DRAWINGS
SUBMITTED TO THE ARCHITECT FOR REVIEW DO NOT CONSTITUTE "IN WRITING" UNLESS IT IS CLEARLY NOTED ON THE SUBMITTAL THAT
SPECIFIC CHANGES ARE BEING REQUESTED WITH THE PHRASE "REQUESTED CHANGE".
13. THROUGHOUT THE CONSTRUCTION DOCUMENTS, ITEMS THAT ARE EXISTING ARE INDICATED AS "EXISTING" OR "(E)", ITEMS WITHOUT THIS
INDICATION ARE NEW CONSTRUCTION. WHERE REQUIRED FOR PURPOSES OF CLARITY, SOME ITEMS MAY BE INDICATED AS "NEW OR "(N)".
14. SHORING & BRACING PLANS PER GENERAL CONTRACTOR'S MEANS AND METHODS TO BE COMPLETED & SUBMITTED SEPARATELY BY G. C.
15. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING MATERIALS AND COMPONENTS TO REMAIN. IN THE
EVENT OF DAMAGE, SUCH ITEMS SHALL BE IMMEDIATELY REPAIRED OR REPLACED BY CONTRACTOR AT HIS EXPENSE, TO THE SATISFACTION
OF THE ARCHITECT AND OWNER.
1. DUNBAR ARCHITECTURE ASSUMES NO RESPONSIBILITY FOR THE MANAGEMENT OF HAZARDOUS MATERIALS THAT MAY BE ON THIS SITE.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSURING THAT PERSONNEL WITHIN THE WORK AREA ARE PROTECTED FROM EXPOSURE
TO ANY HAZARDOUS MATERIALS ENCOUNTERED. IF MATERIALS ARE DISCOVERED THAT MAY BE HAZARDOUS. THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE STATE'S REPRESENTATIVE AND CEASE W ORK UNTIL CONDITIONS CAN BE MAINTAINED IN COMPLIANCE WITH ALL
APPLICABLE REGULATIONS.
HAZARDOUS MATERIALS
ACPL ACOUSTIC PLASTER
ACT ACOUSTIC TILE
AFF ABOVE FINISHED FLOOR
BLKG BLOCKING
BD BOARD
BOS BOTTOM OF STRUCTURE
CPT CARPET
CSWK CASEWORK
CLG CEILING
CEM CEMENT
CPL CEMENT PLASTER
CL CENTERLINE
CT CERAMIC TILE
CLF CHAIN LINK FNECE
CLR CLEAR
COL COLUMN
CONC CONCRETE
CJ COLD JOINT
CONT CONTINUOUS
CF CUBIC FEET
DET DETAIL
DIM DIMENSION
DR DOOR
DRF DOOR FRAME
DL DOOR LOUVER
DN DOWN
DS DOWN SPOUT
DF DRINKING FOUNTAIN
DWGS DRAWINGS
EA EACH
ELEC ELECTRIC
EWC ELECTRIC WATER
COOLER
ELEV ELEVATION
ENCL ENCLOSURE
EQ EQUAL
EQUIP EQUIPMENT
(E) EXISTING
EXP EXPANSION/EXPOSED
EJ EXPANSION JOINT
EXT EXTERIOR
FS FLOOR SINK
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FIN FINISH
FC FINISH CEILING
FG FINISH GRADE
FFE FINISH FLOOR GRADE
FEC FIRE EXTINGUISHER
CABINET
FD FLOOR DRAIN
FLR FLOOR
FURN FURNISH/FURNITURE
GA GAUGE
GALV GALVANIZED
GL GLASS
GLU LAM GLUE LAMINATED
GB GRAB BAR
GPL GYPSUM PLASTER
GWB GYPSUM WALLBOARD
GWW WATER RESISTANT GWB
GC GENERAL CONTRACTOR
H HIGH
HDW HARDWARE
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
TYPICAL ABBREVIATIONS
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
JT JOINT
JST JOIST
LAM LAMINATE
LT LIGHT
LVR LOUVER
MAX MAXIMUM
MECH MECHANICAL
MIN MINIMUM
MH MANHOLE
MFR MANUFACTURER
MTL METAL
MTD MOUNTED
NIC NOT IN CONTRACT
NTC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED/
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED/
OWNER INSTALLED
OPNG OPENING
OPP OPPOSITE
PA PLANTING AREA
PL PLATE/PROPERTY LINE
PLWD PLYWOOD
PTD PAINTED
RD ROOF DRAIN
REF REFERENCE
REINF REINFORCED
REQD REQUIRED
RO ROUGH OPENING
RQMT REQUIREMENT
RWL RAIN WATER LEADER
SHT SHEET
SHTH SHEATHING
SB SPLASH BLOCK
STN STAIN
STD STANDARD
STL STEEL
STR STRUCTURE
SUSP SUSPENDED
SM SHEET METAL
SIM SIMILAR
TJ TOOLED JOINT
TS TUBE STEEL
TYP TYPICAL
TEMP TEMPERATURE
UC UNDER CUT/UNDER
COUNTER
UNO UNLESS NOTED
OTHERWISE
VERT VERTICAL
VIF VERIFIED IN FIELD
WIN WINDOW
W/ WITH
WD WOOD
W/O WITH OUT
ARCHITECTURAL SYMBOLSGENERAL NOTES
1. STATE ON PLANS THAT THE OUTDOOR LIGHTING SYSTEMS SHALL BE
DESIGNED AND INSTALLED TO COMPLY WITH ALL OF THE FOLLOWING:
A. THE MINIMUM REQUIREMENTS IN CALIFORNIA ENERGY CODE
FOR LIGHTING ZONES 1-4
B. BACKLIGHT, UPLIGHT AND GLARE (BUG) RATINGS AS DEFINED IN
IESNA TM-15-11
C. ALLOWABLE BUG RATINGS NOT EXCEEDING THOSE SHOWN IN
ON TABLE 5.106.8
(5.106.8)
2. PROVIDE A WEATHER-RESISTANT EXTERIOR WALL AND FOUNDATION
ENVELOPE AS REQUIRED BY CBC 1402.2. (5.407.1)
3. DESIGN AND MAINTAIN LANDSCAPE IRRIGATION SYSTEMS TO
PREVENT SPRAY ON STRUCTURES. (5.407.2.1)
4. ONLY A CERTIFIED HAULER WILL BE USED FOR HAULING OF
CONSTRUCTION WASTE. (5.408.1)
5. ALTERATIONS TO A BUILDING SPACE THAT MEET THE SCOPING
PROVISIONS IN SECTION 301.1 FOR NONRESIDENTIAL ADDITIONS AND
ALTERATIONS, SHALL REQUIRE VERIFICATION THAT UNIVERSAL
WASTE ITEMS SUCH AS FLUORESCENT LAMPS AND BALLAST AND
MERCURY CONTAINING THERMOSTATS AS WELL AS OTHER
CALIFORNIA PROHIBITED UNIVERSAL WASTE MATERIALS ARE
DISPOSED OF PROPERTY AND ARE DIVERTED FROM LANDFILLS.
REFER TO UNIVERSAL WASTE RULE LINK AT:
HTTP:DTSC.CA.GOV/UNIVERSALWASTE/ (5.408.1.4)
6. 100% OF TREES, STUMPS, ROCKS AND ASSOCIATED VEGETATION AND
SOILS RESULTING FROM LAND CLEARING SHALL BE REUSED OR
RECYCLED. (5.408.3)
7. PROVIDE READILY ACCESSIBLE AREAS THAT SERVE THE ENTIRE
BUILDING AND ARE IDENTIFIED FOR THE DEPOSITING, STORAGE AND
COLLECTION OF NON-HAZARDOUS MATERIALS FOR RECYCLING,
INCLUDING (AT A MINIMUM) PAPER, CORRUGATED CARDBOARD,
GLASS, PLASTIC, ORGANIC WASTE AND METALS, OR MEET A
LAWFULLY ENACTED LOCAL RECYCLING ORDINANCE, IF MORE
RESTRICTIVE. (5.410.1)
8. IF THE NEW HVAC SYSTEM IS USED DURING CONSTRUCTION, USE
RETURN AIR FILTERS WITH A MERV OF 8. REPLACE ALL FILTERS
IMMEDIATELY PRIOR TO OCCUPANCY. (5.504.1.3)
9. ALL NEW DUCTS AND OTHER NEW RELATED AIR DISTRIBUTION
COMPONENTS OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC,
OR SHEET METAL UNTIL THE FINAL STARTUP OF THE HEATING,
COOLING AND VENTILATING EQUIPMENT. (5.504.3)
10. ARCHITECTURAL PAINTS AND COATINGS, ADHESIVES, CAULKS AND
SEALANTS SHALL COMPLY WITH THE VOLATILE ORGANIC COMPOUND
(VOC) LIMITS LISTED IN TABLES 5.504.4.1-5.504.4.3.
(5.504.4.1- 5.504.4.3)
11. THE VOC CONTENT VERIFICATION CHECKLIST SHALL BE COMPLETED
AND VERIFIED PRIOR TO FINAL INSPECTION APPROVAL. THE
MANUFACTURER’S SPECIFICATIONS SHOWING VOC CONTENT FOR ALL
APPLICABLE PRODUCTS SHALL BE READILY AVAILABLE AT THE JOB
SITE AND BE PROVIDED TO THE FIELD INSPECTOR FOR VERIFICATION.
(5.504.4.3.2)
12. NEW HARDWOOD PLYWOOD, PARTICLE BOARD, AND MEDIUM DENSITY
FIBERBOARD COMPOSITE WOOD PRODUCTS USED IN THE INTERIOR
OR EXTERIOR OF THE BUILDING SHALL MEET THE FORMALDEHYDE
LIMITS. THE FORMALDEHYDE EMISSIONS VERIFICATION CHECKLIST,
SHALL BE COMPLETED PRIOR TO FINAL INSPECTION APPROVAL. THE
MANUFACTURER’S SPECIFICATIONS SHOWING FORMALDEHYDE
CONTENT FOR ALL APPLICABLE WOOD PRODUCTS SHALL BE READILY
AVAILABLE AT THE JOB SITE AND BE PROVIDED TO THE FIELD
INSPECTOR FOR VERIFICATION. (5.504.4.5)
13. MECHANICALLY VENTILATED BUILDINGS SHALL HAVE AIR FILTER WITH
A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 13 OR HIGHER.
FILTERS SHALL BE INSTALLED PRIOR TO OCCUPANCY AND
RECOMMENDATIONS FOR MAINTENANCE WITH FILTERS OF THE SAME
VALUE SHALL BE INCLUDED IN THE OPERATION AND MAINTENANCE
MANUAL. (5.504.5.3)
14. DESIGNATED OUTDOOR SMOKING AREA SHALL BE AT LEAST 25 FEET
FROM AN OUTDOOR AIR INTAKE OR OPERABLE WINDOWS.
(5.504.7)
15. BUILDINGS SHALL MEET OR EXCEED THE PROVISIONS OF CALIFORNIA
BUILDING CODE, CCR, TITLE 24, PART 2 SECTIONS 1202 (VENTILATION)
AND CHAPTER 14 (EXTERIOR WALLS). FOR ADDITIONAL MEASURES,
SEE SECTION 5.407.2 (5.505.1)
16. BUILDING EXPOSED TO A NOISE LEVEL OF 65dB LEQ-1 HR DURING ANY
HOUR OF OPERATION SHALL HAVE BUILDING, ADDITION OR
ALTERATION EXTERIOR WALL AND ROOF-CEILING ASSEMBLIES
EXPOSED TO THE NOISE SOURCE MEETING A COMPOSITE STC RATING
OF AT LEAST 45.
(5.507.4.1.1)
17. BUILDINGS THAT USE DEMAND CONTROL VENTILATION SHALL HAVE
CO2 SENSORS AND VENTILATION CONTROLS INSTALLED IN
ACCORDANCE WITH THE REQUIREMENTS OF THE CURRENT EDITION
OF THE CALIFORNIA ENERGY CODE, CCR, TITLE 24, PART 6, SECTION
121(C). (5.506.2)
18. THE HVAC, REFRIGERATION, AND FIRE SUPPRESSION EQUIPMENT
SHALL NOT CONTAIN CFC OR HALONS. (5.508.1.)
19. NEW PLUMBING FIXTURES AND FITTINGS SHALL NOT EXCEED THE
MAXIMUM ALLOWABLE FLOW RATE SPECIFIED IN SECTION 5.303.3.
(5.303.3)
1. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL EXISTING MATERIALS AND COMPONENTS TO REMAIN. EXTENT
OF PROTECTIONS IS TO COVER ALL EXISTING OR HISTORIC ELEMENTS TO REMAIN WHICH ARE IN THE VICINITY OF CONSTRUCTION
ACTIVITIES, WHETHER SPECIFICALLY CALLED OUT ON THE DRAWINGS OR NOT. ALL QUESTIONABLE PROTECTION REQUIREMENTS SHOULD
BE IDENTIFIED FOR ARCHITECT’S REVIEW. IN THE EVENT OF DAMAGE, SUCH ITEMS SHALL BE IMMEDIATELY REPAIRED OR REPLACED BY
CONTRACTOR AT THEIR EXPENSE TO THE SATISFACTION OF ARCHITECT AND OWNER.
2. EXISTING/ HISTORIC ELEMENTS ARE DEFINED AS THOSE FINISHES, COMPONENTS, OR AREAS IDENTIFIED IN THE DRAW INGS.
3. PROTECTION SHALL REMAIN IN PLACE FOR THE DURATION OF THE PROJECT UNLESS DETERMINED OTHERWISE. PROTECTION MATERIALS
SHOULD NOT BE DIRECTLY ATTACHED TO HISTORIC ELEMENTS. AVOID ADDITIONAL PENETRATIONS INTO HISTORIC ELEMENTS.
4. REPAIR HISTORIC FEATURES IF NECESSARY TO MATCH IN KIND.
PROTECTION NOTES
No. Description Date
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
4/
7
/
2
0
2
5
9
:
2
1
:
0
0
P
M
T0.10
PLANNING -
CONDITIONS OF
APPROVAL
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
No. Description Date
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
4/
7
/
2
0
2
5
9
:
2
1
:
0
1
P
M
T1.00
EXISTING PHOTOS
& MATERIALS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
3 EXISTING EXTERIOR PHOTOS
NTS
2 EXISTING INTERIOR PHOTOS
NTS
1 PRELIMINARY MATERIALS & FINISHES
NTS
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
REF.
GENERAL NOTES
1. FURNITURE ON ALL PLANS ARE SHOWN STRICTLY FOR DESIGN CONCEPT. COORDINATE FINAL
FURNITURE SELECTIONS AND SPECIFICATIONS WITH FURNITURE VENDORS.
2. PER CBC 1010.1.10, DOORS SERVING ROOMS OR SPACES WITH AN OCCUPANT LOAD OF 50 OR
MORE ARE REQUIRED TO HAVE PANIC HARDWARE OR FIRE EXIT HARDWARE.
3. ROOM OCCUPANT LOAD FACTORS PER CBC 1004, TABLE 1004.1.2.
4. REFER TO FOR ALL DOOR MANEUVERING CLEARANCE REQUIREMENTS AND A5.06 FOR
THE DOOR SCHEDULE.
5. REFER TO CIVIL DRAWINGS FOR ALL GRADING INFORMATION.
6. REFER TO A0.00 SITE PLAN FOR GATE INFORMATION.
7. 114 TOTAL BUILDING OCCUPANTS < 300 OCCUPANTS, THEREFORE HIGHER RISK CATEGORY IS
NOT REQUIRED.
SIGNAGE SCHEDULE LEGENDS
Room name
150 SF
100 GROSS
10
101 ROOM NUMBER
AREA
OCCUPANT LOAD FACTOR; GROSS LOAD FACTOR U.N.O.;
AU = AUXILIARY USE
OCCUPANT LOAD
NUMBER & DIRECTION OF OCCUPANTS USING EGRESS
NUMBER & DIRECTION OF COMBINED OCCUPANTS USING EGRESS
COMMON PATH OF EGRESS TRAVEL DISTANCE -THE MAXIMUM LENGTH OF
EXIT ACCESS TRAVEL, MEASURED FROM THE MOST REMOTE POINT WITHIN A
STORY TO THE ENTRANCE TO AN EXIT ALONG THE NATURAL AND
UNOBSTRUCTED PATH OF EGRESS TRAVEL.
EXIT ROUTES -EXIT ROUTES FROM INDIVIDUAL HABITABLE SPACES TO THE
NEAREST EXIT ACCESS.
RECESSED FIRE EXTINGUISHER
REFER TO FOR MOUNTING HEIGHT
01 TACTILE EXIT SIGNAGE SHALL BE REQUIRED AT THE FOLLOWING LOCATIONS PER CBC 1013.4:
• EACH GRADE LEVEL EXTERIOR EXIT DOOR THAT IS REQUIRED TO COMPLY WITH
SECTION 1013.1 SHALL BE IDENTIFIED BY A TACTILE EXIT SIGN WITH THE WORD "EXIT"
• EACH EXIT DOOR THAT IS REQUIRED TO COMPLY WITH CBC 1013.1 THAT LEADS
DIRECTLY TO A GRADE-LEVEL EXTERIOR EXIT BY MEANS OF AN EXIT ENCLOSURE THAT
DOES NOT UTILIZE A STAIR OR RAMP OR BY MEANS OF AN EXIT PASSAGEWAY, SHALL
BE IDENTIFIED BY A TACTILE EXIT SIGN WITH THE WORDS "EXIT ROUTE"
• EACH EXIT ACCESS DOOR FROM AN INTERIOR ROOM OR AREA TO A CORRIDOR OR
HALLWAY THIS IS REQUIRED TO COMPLY WITH CBC 1013.1 SHALL BE IDENTIFIED BY A
TACTILE EXIT SIGN WITH THE WORDS "EXIT ROUTE"
• EACH EXIT DOOR THROUGH A HORIZONTAL EXIT THAT IS REQUIRED TO COMPLY WITH
CBC 1013.1 SHALL BE IDENTIFIED BY A TACTILE EXIT SIGN WITH THE WORDS "TO EXIT"
• REFER TO DETAIL
02 MAXIMUM OCCUPANCY SIGN, REFER TO DETAIL
FEC
CEILING SUSPENDED OR WALL MOUNTED (REFER TO RCP) ILLUMINATED EXIT
SIGN (WITH DIRECTIONAL ARROWS AS INDICATED). EXIT SIGNS SHALL BE
ILLUMINATED AT ALL TIMES FOR A DURATION OF NOT LESS THAN 90 MINUTES
IN CASE OF PRIMARY POWER LOSS. TO ENSURE THIS CONTINUOUS
ILLUMINATION, THE EXIT SIGN MUST BE CONNECTED TO AN EMERGENCY
POWER SYSTEM PROVIDED FROM STORAGE BATTERIES, UNIT EQUIPMENT OR
AN ON-SITE GENERATOR, CBC 1013.6.3.
ALL SIGNAGE TO BE MOUNTED PER DETAIL
FOR ALL SIGNAGE REQUIREMENTS & SPECIFICATIONS REFER TO DETAIL
03 TOILET IDENTIFICATION SIGN, REFER TO DETAIL
04 TOILET DOOR SIGN, REFER TO DETAIL
20
A5.03
ACCESSIBLE PATH OF TRAVEL
PATH OF TRAVEL (P.O.T.) AS INDICATED IS A BARRIER FREE ACCESS ROUTE
WITHOUT ANY ABRUPT VERTICAL CHANGES EXCEEDING 1/2" BEVELED AT 1:2
MAXIMUM SLOPE, EXCEPT THAT LEVEL CHANGES DO NOT EXCEED 1/4" VERTICAL
AND IS AT LEAST 48" WIDE, UNLESS NOTED OTHERWISE. SURFACE IS SLIP
RESISTANT, STABLE, FIRM AND SMOOTH. CROSS-SLOPE DOES NOT EXCEED 2%
AND SLOPE IN THE DIRECTION OF TRAVEL IS LESS THAN 5% UNLESS OTHERWISE
INDICTED. (POT) SHALL BE MAINTAINED FREE OF OVERHANGING OBSTRUCTIONS
TO 80" MINIMUM AND PROTRUDING OBJECTS GREATER THAN 4" PROJECTION
FROM WALL AND ABOVE 27" AND LESS THAN 80". ARCHITECT TO VERIFY THAT
ALL BARRIERS IN THE PATH OF TRAVEL HAVE BEEN REMOVED OR WILL BE
REMOVED UNDER THIS PROJECT, AND PATH OF TRAVEL COMPLIES WITH CBC
11B-303 & 11B-304.
WALKS, SIDEWALKS, AND PEDESTRIAN WAYS SHALL BE FREE OF GRATINGS
WHENEVER POSSIBLE. FOR GRATINGS LOCATED IN THE SURFACE OF ANY OF
THESE AREAS, GRID OPENINGS IN GRATINGS SHALL BE LIMITED TO 1/2" IN THE
DIRECTION OF TRAFFIC FLOW. IF GRATINGS HAVE ELONGATED OPENINGS,
THEY SHALL BE PLACED SO THAT THE LONG DIMENSION IS PERPENDICULAR
TO THE DOMINANT DIRECTION OF TRAVEL (CBC 11B-302.3)
19
A5.00
1-HOUR RATED WALL
-EXTERIOR WALLS ALONG GRIDS 1 AND 3 ARE TO BE 1-HOUR FIRE-
RESISTANCE RATED DUE TO FIRE SEPARATION DISTANCE
-EXTERIOR OPENINGS ARE TO BE PROTECTED BY AN EXTERIOR
FIRE SPRINKLER SYSTEM PER CHBC 8-402.1 (DEFERRED
SUBMITTAL)
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
17
A5.00
14
A5.00
10
A5.00
15
A5.00
11
A5.00
11
A5.00
PLUMBING FIXTURE REQUIREMENTS
NO EXISTING PLUMBING FIXUTRES REMAIN ON SITE, ALL FIXTURES ARE NEW.
/2 A5.00
1006 SF
MULTI-PURPOSE ROOM
A
7 NET
144
02
212 SF
ENTRY / CHECK IN
OFFICE
150
2
01 348 SF
TRAINING ROOM B
15 NET
18
03
375 SF
TRAINING ROOM C
15 NET
25
05
162 SF
WOMENS
AU
-
07
139 SF
MENS
AU
-
09
273 SF
OFFICE AND
BREAKROOM
15
18
10
56 SF
RESTROOM
AU
-
11
15 SF
JANITOR
AU
-
12
01
01 01
01
0304 03 04
03
04
FEC
EMPLOYEE
ONLY GATE
97
18
25
18
260 SF NET
90
2
144
9292
97
PATH OF TRAVEL TO
PUBLIC RIGHT OF WAY
EXIT WIDTH
= 97 X .2 = 19.4" REQUIRED WIDTH
36" PROVIDED > 19.4" REQ'D
EXIT WIDTH
= 92 X .2
= 18.4" REQUIRED WIDTH
36" PROVIDED > 18.4" REQ'D
30' - 11"
OF AREA PER CBC 1007.1.1
48' - 0" MAXIMUM OVERALL DIAGONAL DIMENSION
2 EXITS SEPARATED BY ONE-HALF OF THE MAXIMUM OVERALL DIAGONAL DIMENSION
(48'/2) 24' < 30'-11"
1005 SF NET
7272
02
MIN.
3' - 0"
WALKWAY DIMENSIONS MATCH THE
HISTORIC & (E) LAYOUT.
WALKS CAN BE REDUCED FROM 48"
MIN. TO 36" WHEN EXISTING
CONDITIONS CREATE
UNREASONABLE HARDSHIPS, PER
CBC 11B-403.5.1 EXCEPTION 3.
STRICT COMPLIANCE WITH THE 48"
MIN REQUIREMENT WOULD
DESTROY THE HISTORICAL
SIGNIFICANCE OF THE PROPERTY
(CHBC 8-602.1).
EMPLOYEE
ONLY GATE
FRONT SETBACK
(E) 24' - 7"
SIDE SETBACK
(E
)
4
'
-
1
0
"
SI
D
E
S
E
TB
A
C
K
(E
)
5
'
-
3
"
SI
D
E
S
E
TB
A
C
K
(E
)
3
'
-
1
1
"
SI
D
E
S
E
TB
A
C
K
(E
)
3
'
-
0
"
BACK SETBACK
(E) 34' - 2"
(E) RESIDENCE
(E) RESIDENCE
(E) RESIDENCE
24"
60
"
C
L
R
.
4'
-
0
"
ACCESSIBLE DOOR ACTUATOR
PER CHBC 8-603.4, POWER-
ASSISTED DOOR MAY BE
CONSIDERED EQUIVALENT
ALTERNATIVE TO STRIKESIDE
CLEARANCE.
30" x 48" CLR
FLR SPACE
CARD READER
ACCESS ONLY
01
HALLWAY
06
HALLWAY
04
PATH OF TRAVEL
TO PUBLIC WAY
270 NET
DOOR HAS LATCH
AND NO CLOSER
PROVIDE MANEUVERING
SPACE AT GATE, 2.083%
MAX SLOPE IN ANY
DIRECTION
4' 0' 4' 8'12'
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
2
8
/
2
0
2
5
1
1
:
1
4
:
2
8
A
M
T2.00
EGRESS PLAN
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
3/16" = 1'-0"T2.00
1 EGRESS PLAN
No. Description Date
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
ALLEY
℄
HISTORIC BUILDING = 3263 SQFT.
3' - 0"
4'
-
0
"
3'
-
4
"
PROPERTY LINE 150.04'
PROPERTY LINE 150.05'
PR
O
P
E
R
T
Y
L
I
N
E
5
0
.
4
0
'
PROPERTY LINE 50.93'
(E) RESIDENCE
(E) RESIDENCE
(E) RESIDENCE
SF2
SF2
SF3
SF3
SF2
SF1
SF1
SF1
32-01
32-02
02-35
TYP.
31-01
31-01
32-0532-05
TYP.
32-06
32-06
32-06
TYP.
32-03
32-03
32-03
32-04
TYP.
32-04
32-12
32-09
33-01
TYP.
32-06
02-40
02-41
TYP.
31-01
02-04
ROOF OVERHANG
17' - 0"
6' - 0"
G1
G2
G5
G3
G4
EQ EQ
10'-0" MAX.
9' - 1" TYP.
EQ EQ
10'-0" MAX.
9' - 4" TYP.
8'
-
4
"
8'
-
4
"
8'
-
4
"
8'
-
4
"
8'
-
4
"
3'
-
9
"
5' - 4 1/2"2' - 6"
18
'
-
7
"
11
A5.02
3
A5.02
TYP.
32-10
9
A5.02
TYP.
32-10 9
A5.02
3
A5.02
3
A5.02
4"
4"
1' - 6"
1'
-
6
"
7'
-
4
"
1' - 6"TYP.
32-10 9
A5.02
TYP.
32-10
9
A5.02
10
A5.02
TYP.
2
A5.02
6
A5.02
TYP.
6
A5.02
TYP.
23-03
23-03
7' - 6"11' - 6"7' - 10 1/2"
6'
-
0
"
3'
-
4
"
EQ EQ
4"
26-02
7' - 1"7' - 1"7' - 1"VARIES
4"
23-07
23-07
32-11
32-12
08-08
22-10
32-13
32-14
26-09
26-09
24' - 7 1/8"
ACCESSIBLE DOOR ACTUATOR
PER CHBC 8-603.4, POWER-ASSISTED
DOOR MAY BE CONSIDERED
EQUIVALENT ALTERNATIVE TO
STRIKESIDE CLEARANCE.
(E
)
5
'
-
0
"
7' - 7" TYP.
(E
)
4
'
-
1
0
"
(E
)
3
'
-
0
"
(E
)
4
'
-
0
"
6'
-
1
"
6'
-
1
"
6'
-
1
"
6'
-
1
"
8' - 3"8' - 6"8' - 6"
CENTER
DRIVEWAY
ON (E) WALL
16
'
-
1
0
"
V
I
F
(E) 24' - 10 1/2" VIF (E) 90' - 6" VIF (E) 34' - 8" VIF
(E) 24' - 9 3/8" VIF (E) 72' - 7" VIF (E) 52' - 8 1/8" VIF
G6
5'
-
6
"
5' - 3"
SITE PLAN GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED
WALL, U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE
VERIFIED BY THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT
WITH THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. CONTRACTOR SHALL VERIFY "CENTERLINE" AND "MATCHLINE" ALIGNMENTS OF ALL
ARCHITECTURAL ELEMENTS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES BEFORE PROCEEDING.
6. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
7. LANDSCAPE CONTRACTOR TO COORDINATE AND OVERSEE IRRIGATION DESIGN AND
INSTALLATION. IRRIGATION SYSTEMS TO BE DESIGNED AND MAINTAINED TO PREVENT SPRAY ON
TO STRUCTURES (CAL GREEN 5.407.2.1). ALL IRRIGATION COMPONENTS TO MEET THE CITY
STANDARD EQUIPMENT LIST.
SITE PLAN LEGEND
KEYNOTES
CONCRETE VEHICULAR PAVING; REFER TO
PROPERTY LINE
SITE LIGHT FIXTURE TAG, REFER TO A0.00 FOR FIXTURE SCHEDULE
NOTE: REFER TO A1.20 FOR BUILDING LIGHT FIXTURE SCHEDULE
FxSFx
FIXTURE SCHEDULE -SITE LIGHTING
GATE SCHEDULE
GATE NO.SIZE MATERIAL FINISH DETAIL REMARKS
G1 3'-0" W x 8'-0" H STEEL POWDER COAT 7/A5.02 1
G2 3'-2" W x 8'-0" H STEEL POWDER COAT 8/A5.02 3
G3 3'-5" W x 8'-0" H STEEL POWDER COAT 8/A5.02 3, 5
G4 2'-7" W x 8'-0" H STEEL POWDER COAT 8/A5.02 3, 5
G5 17'-0" W x 8'-0" H STEEL POWDER COAT - 2
REMARKS:
1. CUSTOM EGRESS GATE; CONTRACTOR TO SUBMIT PRODUCT DATA AND SHOP DRAWINGS FOR APPROVAL. PROVIDE SELF-CLOSING
HINGES, PANIC HARDWARE AND GATE PULL BAR - INSTALLED PER MANUFACTURER'S INSTRUCTIONS
2. CUSTOM SLIDING GATE WITH WIRELESS ENTRY; CONTRACTOR TO SUBMIT PRODUCT DATA AND SHOP DRAWINGS FOR APPROVAL.
3. PROVIDE SELF-CLOSING HINGES AND LOCKABLE LATCH - INSTALLED PER MANUFACTURER'S INSTRUCTIONS
4. PROVIDE SELF-CLOSING HINGES, GATE PULL BARS, AND CANE BOLTS - INSTALLED PER MANUFACTURER'S INSTRUCTIONS.
5. EMPLOYEE USE GATE ONLY.
6. CUSTOM EGRESS GATE; CONTRACTOR TO SUBMIT PRODUCT DATA AND SHOP DRAWINGS FOR APPROVAL. PROVIDE SELF-CLOSING
HINGES AND GATE LATCH AND LEVER - INSTALLED PER MANUFACTURER'S INSTRUCTIONS. GATE TO NOT BE OPERABLE FROM ALLEY
SIDE, PROVIDE NO ACEESS HARDWARE. PANIC HARDWARE IS NOT REQUIRED FOR OCCUPANT COUNT.
NOTE:
1. CONTRACTOR TO PROVIDE SCALED SHOP DRAWINGS OF GATES AND GATE HARDWARE FOR APPROVAL PRIOR TO FABRICATION; REFER TO SPECIFICATION.
GATE TAG, REFER TO GATE SCHEDULEGx
CONCRETE PAVING / PATHWAY; REFER TO 1
A5.02
5
A5.02
GRAVEL SWALE; REFER TO CIVIL DRAWINGS
G6 3'-0" W x 8'-0" H STEEL POWDER COAT 7/A5.02, SIM 6
4' 0' 4' 8'12'
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
1
:
1
9
P
M
A0.00
SITE PLAN
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
3/16" = 1'-0"A0.00
1 SITE - PROPOSED
02-04 (E) SCORED SLAB TO REMAIN; CLEAN, PATCH AND REPAIR TOPPING SLAB AS REQUIRED FOR
SMOOTH FLOOR SURFACE, ASSUME 10% OF SLAB WILL NEED TO BE PATCHED; REFER TO FINISH
PLAN FOR SCORED PATTERN
02-35 (E) TREE AND ROOTS TO REMAIN, PROTECT IN PLACE; PROVIDE TREE PROTECTION FENCING AND
CARE PER SPECIFICATIONS
02-40 (E) STREET LIGHT TO REMAIN
02-41 (E) POWER POLE TO REMAIN
08-08 ACCESSIBLE DOOR ACTUATOR PUSH PLATE, POLE MOUNTED.
22-10 RECESSED WALL MOUNTED HOSE BIB, LOCAKABLE HOUSING, REFER TO PLUMBING DRAWINGS
23-03 HVAC CONDENSING UNIT, FLOOR MOUNTED TO 6" CONCRETE HOUSEKEEPING PAD, REFER TO
MECHANICAL & STRUCTURAL DWGS.
23-07 HVAC CONDENSING UNIT, WALL MOUNTED, REFER TO MECHANICAL AND STRUCUTRAL DWGS.
26-02 MAIN METER/ MAIN DISTRIBUTION PANELBOARD MOUNTED TO 4" CONCRETE HOUSEKEEPING PAD,
REFER TO ELECTRICAL AND STRUCTURAL DRAWINGS
26-09 SITE POLE LIGHT, REFER TO LIGHT FIXTURE SCHEDULE ON A0.00 & STRUCUTRAL DWGS FOR
FOOTING DETAIL
31-01 PLANTING AREA, REFER TO LANDSCAPE DWGS.
32-01 DRIVEWAY APPROACH PER CITY OF SANTA ANA STANDARDS; REFER TO CIVIL DWGS.
32-02 CONCRETE DRIVEWAY TO MATCH ORIGINAL CONFIGURATION
32-03 CONCRETE PAVING / PATHWAY, MATCH ORIGINAL CONFIGURATION
32-04 CONCRETE VEHICULAR PAVING
32-05 TRASH/RECYCLING
32-06 8'-0" TALL METAL FENCE AT SIDES AND REAR PERIMETER OF SITE
32-09 6" HIGH CONCRETE CURB
32-10 SAWCUT JOINT, TYP
32-11 CONCRETE V-GUTTER, REFER TO CIVIL DWGS.
TYPE MARK COUNT DESCRIPTION COMMENTS
SF1 3 PATH LIGHT REFER TO ELECTRICAL DRAWINGS AND CUT SHEETS FOR SELECTED PRODUCTS
SF2 3 UP LIGHT REFER TO ELECTRICAL DRAWINGS AND CUT SHEETS FOR SELECTED PRODUCTS
SF3 2 SITE POLE LIGHT REFER TO ELECTRICAL DRAWINGS AND CUT SHEETS FOR SELECTED PRODUCTS
NOTE: REFER TO A1.20 FOR BUILDING LIGHTING FIXTURE SCHEDULE
32-12 GRAVEL SWALE, REFER TO CIVIL DWGS.
32-13 FLAG POLE, REFER TO STRUCTURAL DWGS. FOR FOOTING DETAIL
32-14 SAW CUT EXISTING FULL DEPTH PAVEMENT, REFER TO CIVIL DWGS; EXTENTS FOLLOWS CITY
STANDARD PLAN REQUIREMENTS #319 CASE 2
33-01 WATER METER VAULT IN (E) LOCATION, REFER TO CIVIL DWGS.
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
REF.
T
FC
-2
T
FC
-4
TFC-3
T FC-1
T FC-5
PLAN LEGENDKEYNOTES
1-HOUR RATED WALL
-EXTERIOR WALLS ALONG GRIDS 1 AND 3 ARE TO BE 1-HOUR FIRE-
RESISTANCE RATED DUE TO FIRE SEPARATION DISTANCE
-EXTERIOR OPENINGS ARE TO BE PROTECTED BY AN EXTERIOR
FIRE SPRINKLER SYSTEM PER CHBC 8-402.1 (DEFERRED SUBMITTAL)
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS SHOWN AT (E) CONDITIONS
ARE TO FACE OF (E) FINISH. DIMENSIONS AT NEW WORK ARE TO FACE OF FRAMING, U.O.N.
DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY THE
CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. NEW WALL SURFACES SHALL ALIGN WITH EXISTING, ADJACENT OR ADJOINING SURFACES,
U.O.N. JOINTS SHALL BE SMOOTH WITH NO VISIBLE JOINTS.
6. CONTRACTOR SHALL VERIFY "CENTERLINE" AND "MATCHLINE" ALIGNMENTS OF ALL
ARCHITECTURAL ELEMENTS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES BEFORE PROCEEDING.
7. DOORS SHALL BE LOCATED SO AS TO ALLOW A FULL 90 DEGREE OPENING AT A MAXIMUM OF 4"
FROM ADJACENT WALLS OR PARTITIONS WITHOUT INTERFERENCE FROM LATCHSETS, DOORS,
OR OTHER HARDWARE.
8. COORDINATE LOCATION AND PROVIDE BLOCKING, BACKINGS AND/OR REINFORCEMENTS IN
PARTITIONS FOR ALL CABINETS, COUNTERTOPS AND ANY WALL MOUNTED ITEMS. REFER TO
ELEVATIONS AND DETAILS FOR LOCATIONS OF WALL STANDARDS AND OTHER SUPPORTS.
9. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING
FEATURES ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS
POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
10. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE
NOT BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON
THE EXTERIOR OF THE BUILDING.
11. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE
WINDOWS. COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY
MEASURES IN PLACE ON SITE.
12. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS
ARE TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.PROPERTY LINE
CONCRETE SLAB ON GRADE INFILL OVER VAPOR RETARDER, REFER TO
STRUCTURAL DRAWINGS AND GEOTECH REPORT
3" DEPRESSED CONCRETE SLAB ON GRADE OVER VAPOR RETARDER FOR TILE
FLOOR FINISH; SLOPE TO DRAIN 1/8" PER FOOT MIN.; REFER TO STRUCTURAL
DWGS AND GEOTECH REPORT
1i
xx
00
WALL TYPE TAG, REFER TO
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
5
A5.03
THERMOSTAT, REFER TO MECHANICAL DRAWINGST
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
A2.01
2
1
A3.00
1
A3.01
A2.002
A2.02
2
A2.00 4
2
A3.01
2
A3.00
1
2
3
A B C D E F
A4.00
1
8"
15
'
-
8
"
25
'
-
0
"
1'
-
3
"
42
'
-
7
"
72' - 5"18' - 10"
26
'
-
6
"
14
'
-
9
"
1"7' - 1"18' - 0"22' - 6"23' - 7"18' - 6"7"
90' - 4"
10' - 9"
1006 SF
MULTI-PURPOSE
ROOM A
02
212 SF
ENTRY / CHECK
IN OFFICE
01
348 SF
TRAINING ROOM
B
03
HALLWAY
04
375 SF
TRAINING ROOM
C
05
HALLWAY
06
WOMENS
07
MENS
09
273 SF
OFFICE AND
BREAKROOM
10
RESTROOM
11
JANITOR
12
03
02
01
12
04
05
14
16
18
17
07
20
21
13
15
19
24 23 22 21 20 18
9
8
1514
13121165432710
25
16
1
A4.01
1
A4.01
A.
B.
C.
D.
A4.02
A.
B.
C.
D.
A4.03
A
B
C
D
A4.04
A
B
C
D
A4.02
A
B
C
D
A4.04
A.
B.
C.
D.
A4.02
A
B
C
D
ALIGN ALIGN ALIGN
08-02
08-02
08-03
08-05
08-05
08-04
08-0108-0108-01 08-01
TYP.
32-06
06-01 06-0106-01
17
07-07
07-05
07-06 07-06
09-02
09-01
09-02
09-02
2
A1.00
10
'
-
2
"
09
-01
.06-02
3
A1.00
TYP.
02-04
TYP.
02-04 TYP.
02-04 TYP.
02-04
TYP.
02-04
08-06
A2.01
11
1' - 0"
SH
E
A
R
W
A
L
L
WA
L
L
D
E
P
T
H
A
S
RE
Q
U
I
R
E
D
F
O
R
06-01
19.1
10-04
26-02
23-03
08-08
26-01
MI
N
C
L
R
1'
-
6
"
23-03
A5
A5r A2r
A2br A2r A2br A4rA2r A4br A3r A3r A1rA2r
G1
G2
G3G4
A2
A2b
A2
A1
A1 A2br A2r
B2
B1b B1
A2r A2br
B1b B1bB1
B1
A2r
A2br
B1
B1
A2br
A1
B2
B1
B4
A1
A2
A2b
A2
A2b
A1
B1
B3
B1
B1
14' - 4"24' - 10"5' - 0"26' - 7"
(E
)
1
5
'
-
7
"
V
I
F
2' - 1"
(E
)
1
5
'
-
7
"
V
I
F
(E
)
2
4
'
-
3
"
V
I
F
43' - 1"9' - 7"2' - 1"8' - 2"1' - 4"
1' - 6"
7' - 3"10' - 3"
(E
)
2
5
'
-
1
"
V
I
F
7'
-
9
"
5'
-
1
"
3' - 3"3' - 3"11' - 8"
EQ EQ
4"
4"4"
A5
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
1
:
2
4
P
M
A1.00
PROPOSED FLOOR
PLAN
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
0'8'4'4'
1/4" = 1'-0"A1.00
1 FLOOR PLAN - NEW
02-04 (E) SCORED SLAB TO REMAIN; CLEAN, PATCH AND REPAIR TOPPING SLAB AS REQUIRED FOR
SMOOTH FLOOR SURFACE, ASSUME 10% OF SLAB WILL NEED TO BE PATCHED; REFER TO
FINISH PLAN FOR SCORED PATTERN
06-01 WOOD COLUMN, REFER TO STRUCTURAL DWGS.
06-02 REPAIR AND PATCH (E) WALL STUDS AND 1x6 SHEATHING; REFER TO STRUCTURAL DRAWINGS
FOR REPAIR DETAIL
07-05 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS
CLOSE AS POSSIBLE
07-06 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS
CLOSE AS POSSIBLE TO CONNECT TO ROOF DRAIN; REPLACE OVERFLOW SCUPPER IN (E)
LOCATION
07-07 (E) UPPER DOWNSPOUT AND CONDUCTOR HEAD TO BE SALVAGED, CLEANED AND RESTORED;
REPLACE MISSING LOWER DOWNSPOUT WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS
CLOSE AS POSSIBLE
08-01 REPOSITION EXISTING WINDOW OPENING TO MATCH ADJACENT WINDOW AND SILL HEIGHTS
DUE TO NEW INTERIOR LAYOUT
08-02 INFILL PREVIOUS DOOR OPENING WITH NEW WINDOW TO MATCH ADJACENT DOUBLE HUNG
WINDOWS
08-03 INFILL PREVIOUS WINDOW; SALVAGE WINDOW AND CASING FOR REUSE AND RELOCATE TO
REAR ELEVATION
08-04 INFILL AT PREVIOUS NON-ORIGINAL DOOR OPENING
08-05 RELOCATED SALVAGED WINDOW SET FROM SOUTH ELEVATION
08-06 RELOCATED SALVAGED WINDOW FROM NORTH ELEVATION
08-08 ACCESSIBLE DOOR ACTUATOR PUSH PLATE, POLE MOUNTED.
09-01 REPAIR AND PATCH (E) WALL STUDS, 1x6 SHEATHING AND PLASTER WALL FINISH; ALL NEW
MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS POSSIBLE; REFER TO STRUCTURAL
DRAWINGS FOR REPAIR DETAIL
09-02 PATCH AND REPAIR PLASTER FINISH, ALL NEW MATERIALS SHALL MATCH ORIGINAL AS CLOSE
AS POSSIBLE IN FINISH AND TEXTURE
10-04 RECESSED FIRE EXTINGUISHER CABINET
23-03 HVAC CONDENSING UNIT, FLOOR MOUNTED TO 6" CONCRETE HOUSEKEEPING PAD, REFER TO
MECHANICAL & STRUCTURAL DWGS.
26-01 PANELBOARD, REFER TO ELECTRICAL DRAWINGS
12" = 1'-0"A1.00
2 PLASTER REPAIR WORK
12" = 1'-0"A1.00
3 STRUCTURAL REPAIRS
26-02 MAIN METER/ MAIN DISTRIBUTION PANELBOARD MOUNTED TO 4" CONCRETE HOUSEKEEPING
PAD, REFER TO ELECTRICAL AND STRUCTURAL DRAWINGS
32-06 8'-0" TALL METAL FENCE AT SIDES AND REAR PERIMETER OF SITE
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
ROOF GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. PATCH (E) SURFACES OPENED FOR INSTALLATION OF STRUCTURAL AND MEP WORK. PATCH
SHALL MATCH (E) CONDITIONS. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK.
PROTECT ALL EXISTING ITEMS THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED
WALL, U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE
VERIFIED BY THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT
WITH THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. REMOVE ALL OBSOLETE EQUIPMENT, PANELS, CONDUIT AND PIPING. ALL UTILITIES SHALL BE
REMOVED TO AS FAR BACK TO THEIR ORIGIN AS POSSIBLE. ALL UTILITIES SHALL BE PROPERLY
CAPPED AT THEIR TERMINATION.
6. REFER TO HAZMAT REPORT FOR LOCATIONS REQUIRING ABATEMENT AND REMOVAL.
7. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
ROOF PLAN LEGENDKEYNOTES
PATCH SHEATHING AT (E) OPENING IN ROOF
TPO MEMBRANE, CLASS A, ROOFING SYSTEM, OVER COVER BOARD OVER
PLYWOOD SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING;
PROVIDE TAPERED INSULATION AS REQUIRED TO MAINTAIN MINIMUM SLOPE
REQUIREMENTS; REFER TO DETAIL
MEMBRANE ROOFING SPECIFICATION (BASIS OF DESIGN):
GAF EVERGUARD TPO 60 MIL MEMBRANE, WHITE
CRRC PRODUCT ID: 0676-0159
SRI: INITIAL 101, AGED 79
ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER
PLYWOOD SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING;
NEW REPLACEMENT TILE TO BE SOURCED FROM GLADDING MCBEAN AT
BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR BLEND AND INSTALL
NEW BIRD STOPS AT END TILES; REFER TO DETAIL
LIGHT FIXTURE TAG, REFER TO A1.20 FOR FIXTURE SCHEDULEFx
1
A5.05
13
A5.05
1
A3.00
1
A3.01
2
A3.00
1
2
3
A B C D E F
2'
-
1
"
15
'
-
8
"
1'
-
6
"
23
'
-
6
"
1'
-
3
"
19
'
-
3
"
19' - 3"
7"7' - 1"18' - 0"22' - 6"23' - 7"18' - 6"7"
18' - 11"71' - 11"
RI
D
G
E
LEVEL LEVEL
LE
V
E
L
LE
V
E
L
F10 F10 F10 F10 F10
F10
F10
F9F9F9F9
F9
23-01
23-01
TYP.
07-04
TYP.
07-08
TYP.
07-04
TYP.
07-08
07-05
07-05
22-01 22-01(E) 1/2" / 1'-0"
TYP.
07-02
TYP.
07-02
TYP.
07-10
TYP.
07-1007-06 07-06
07-05
F9F9
F9
07-03
07-11
RI
D
G
E
8
A5.05
8
A5.05
23-08
23-09
2
A5.05
2
A5.05
2
A5.05
14
A5.05
18
A5.05
18
A5.05
17
A5.05
3
A5.05
3
A5.05
5
A5.05
VALLEY VALLEY
19
A5.05
(E) 6" / 1'-0"(E) 6" / 1'-0"
(E) 6" / 1'-0"
(E
)
6"
/
1
'
-
0
"
(E) 6" / 1'-0"
(E
)
6"
/
1
'
-
0
"
MIN., VIF
(E) 1/2" / 1'-0"
MIN., VIF
(E) 1/2" / 1'-0"
MIN., VIF
(E) 1/2" / 1'-0"
MIN., VIF
(E
)
1
/
2
"
/
1
'
-0"
MI
N
.
,
V
I
F
(E
)
1
/
2
"
/
1
'
-0"
MI
N
.
,
V
I
F
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
1/4" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
1
:
2
6
P
M
A1.10
PROPOSED ROOF
PLAN
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
0'8'4'4'
1/4" = 1'-0"A1.10
1 ROOF - PROPOSED
07-02 TPO MEMBRANE ROOFING SYSTEM OVER COVER BOARD OVER PLYWOOD SHEATHING PER
STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; PROVIDE TAPERED INSULATION AS REQUIRED TO
MAINTAIN MINIMUM SLOPE REQUIREMENTS
07-03 ROOF HATCH
07-04 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER PLYWOOD
SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; NEW REPLACEMENT TILE TO BE
SOURCED FROM GLADDING MCBEAN AT BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR
BLEND AND INSTALL NEW BIRD STOPS AT END TILES
07-05 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS CLOSE
AS POSSIBLE
07-06 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS CLOSE
AS POSSIBLE TO CONNECT TO ROOF DRAIN; REPLACE OVERFLOW SCUPPER IN (E) LOCATION
07-08 ORIGINAL GUTTER TO BE SALVAGED, CLEANED AND RESTORED, GUTTER TO BE FREE OF DEBRIS
AND ORGANIC MATERIAL; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL
MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S
STANDARDS FOR REHABILITATION; INSTALL NEW METAL MESH DEBRIS COVER
07-10 PARAPET FLASHING
07-11 CRICKET, SLOPE TO ROOF AND OVERFLOW DRAINS, MAINTAIN MIN. SLOPE OF 1/8:12 ALONG FLOW
LINES
22-01 ROOF DRAIN TO CONNECT TO CONDUCTOR HEAD AND DOWNSPOUT; THRU-WALL OVERFLOW
SCUPPER
23-01 OUTSIDE AIR DUCT; REFER TO MECHANICAL DRAWINGS
23-08 EXHAUST FAN, REFER TO MECHANICAL DRAWINGS
23-09 EXHAUST AIR DUCT, REFER TO MECHANICAL DRAWINGS
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
REFLECTED CEILING PLAN GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. PROTECT ALL EXISTING ITEMS THAT ARE TO REMAIN. RESTORE ALL SURROUNDING AREAS
AFFECTED BY THE WORK.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED
WALL, U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE
VERIFIED BY THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT
WITH THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. CONTRACTOR SHALL VERIFY "CENTERLINE" AND "MATCHLINE" ALIGNMENTS OF ALL
ARCHITECTURAL ELEMENTS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES BEFORE PROCEEDING.
6. PROVIDE CEILING ACCESS AS INDICATED AND/OR AS REQUIRED FOR EQUIPMENT MAINTENANCE.
VERIFY MANUFACTURER RECOMMENDATIONS.
7. CONTRACTOR TO COORDINATE THE WORK OF ALL TRADES TO MAINTAIN SCHEDULED CEILING
HEIGHTS AND REQUIRED CLEARANCES FOR FIXTURES, DUCTS, SUSPENSION SYSTEMS, PIPING,
ETC.
8. CONTRACTOR TO COORDINATE FIXTURE LOCATIONS WITH ALL (E) AND NEW CEILING FRAMING.
NOTIFY ARCHITECT OF ANY VARIATIONS OR DISCREPANCIES IN LOCATIONS SHOWN PRIOR TO
PROCEEDING.
PLAN LEGEND
EXIT SIGNAGE AND EGRESS ILLUMINATION NOTES KEYNOTES
1. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED. EXIT SIGNS ILLUMINATED BY AN
EXTERNAL SOURCE SHALL HAVE AN INTENSITY OF NOT LESS THAN 5 FOOT CANDLES (54 IUX).
INTERNALLY ILLUMINATED SIGNS SHALL BE LISTED AND LABELED AND SHALL BE INSTALLED IN
ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS AND CBC SECTION 2702.
2. EXIT SIGNS SHALL BE ILLUMINATED AT ALL TIMES. (CBC SECTION 1013.3)
3. EXIT SIGNS SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM THAT WILL PROVIDE AN
ILLUMINATION OF NOT LESS THAN 90 MINUTES IN CASE OF PRIMARY POWER LOSS. (CBC
SECTION 1013.6.3)
4. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED AT ALL TIMES
THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS OCCUPIED.
5. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE LESS THAN 1 FOOT-CANDLE AT THE
WALKING SURFACE.
6. THE POWER SUPPLY FOR MEANS OF EGRESS ILLUMINATION SHALL NORMALLY BE PROVIDED BY
THE PREMISES’ELECTRICAL SUPPLY. IN THE EVENT OF POWER SUPPLY FAILURE, AN
EMERGENCY ELECTRICAL SYSTEM SHALL AUTOMATICALLY ILLUMINATE THE FOLLOWING AREAS:
A. AISLES AND UNENCLOSED EGRESS STAIRWAYS IN ROOMS AND SPACES THAT REQUIRE
TWO OR MORE MEANS OF EGRESS.
B. CORRIDORS, EXIT ENCLOSURES AND EXIT PASSAGEWAYS IN BUILDINGS REQUIRED TO
HAVE TWO OR MORE EXITS.
C. EXTERIOR EGRESS COMPONENTS AT OTHER THAN THE LEVEL OF EXIT DISCHARGE UNTIL
EXIT DISCHARGE IS ACCOMPLISHED FOR BUILDINGS REQUIRED TO HAVE TWO OR MORE
EXITS.
D. INTERIOR EXIT DISCHARGE ELEMENTS, AS PERMITTED IN CBC SECTION 1028.1, IN
BUILDINGS REQUIRED TO HAVE TWO OR MORE EXITS.
E. EXTERIOR LANDINGS, AS REQUIRED BY CBC SECTION 1010.1.6, FOR EXIT DISCHARGE
DOORWAYS IN BUILDINGS REQUIRED TO HAVE TWO OR MORE EXITS.
7. THE EMERGENCY POWER SYSTEM SHALL PROVIDE POWER FOR A DURATION OF NOT LESS THAN
90 MINUTES AND SHALL CONSIST OF STORAGE BATTERIES, UNIT EQUIPMENT OR AN ON-SITE
GENERATOR. THE INSTALLATION OF THE EMERGENCY POWER SYSTEM SHALL BE IN
ACCORDANCE WITH CBC SECTION 2702.
8. EMERGENCY LIGHTING FACILITIES SHALL BE ARRANGED TO PROVIDE INITIAL ILLUMINATION THAT
IS AT LEAST AN AVERAGE OF 1 FOOT-CANDLE (11 LUX) AND A MINIMUM AT ANY POINT OF 0.1
FOOT-CANDLE (1 LUX) MEASURED ALONG THE PATH OF EGRESS AT FLOOR LEVEL. ILLUMINATION
LEVELS SHALL BE PERMITTED TO DECLINE TO 0.6 FOOT-CANDLE (6 LUX)AVERAGE AND A
MINIMUM AT ANY POINT OF 0.06 FOOT-CANDLE (0.6 LUX) AT THE END OF THE EMERGENCY
LIGHTING TIME DURATION. A MAXIMUM-TO-MINIMUM ILLUMINATION UNIFORMITY RATIO OF 40 TO 1
SHALL NOT BE EXCEEDED.
LIGHT FIXTURE SCHEDULE
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E)
WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
ACT CEILING, REFER TO
SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
2
A5.04
GYP. BD. CEILING, REFER TO
1
A5.04
DESIGN-BUILD MECHANICAL CATWALK REQUIRED FOR ACCESS
TO ALL FAN COIL UNITS FROM CEILING ACCESS POINT; FIELD
VERIFY LOCATION WITH (E) TRUSSES AND NEW CEILING FRAMING
SUPPLY AIR DIFFUSER, REFER TO MECHANICAL DRAWINGS
RETURN AIR GRILLE, REFER TO MECHANICAL DRAWINGS
TRANSFER AIR GRILLE, REFER TO MECHANICAL DRAWINGS
EXHAUST AIR GRILLE / EXHAUST FAN, REFER TO MECHANICAL DRAWINGS
WALL MOUNTED (EX1) OR CEILING SUSPENDED (EX2) ILLUMINATED EXIT SIGN.
EXIT SIGNS SHALL BE ILLUMINATED AT ALL TIMES FOR A DURATION OF NOT
LESS THAN 90 MINUTES IN CASE OF PRIMARY POWER LOSS. TO ENSURE THIS
CONTINUOUS ILLUMINATION, THE EXIT SIGN MUST BE CONNECTED TO AN
EMERGENCY POWER SYSTEM PROVIDED FROM STORAGE BATTERIES, UNIT
EQUIPMENT OR AN ON-SITE GENERATOR, CBC 1013.6.3. REFER TO ELECTRICAL
DRAWINGS
1
A3.00
1
A3.01
2
A3.01
MULTI-PURPOSE
ROOM A
02
ENTRY / CHECK
IN OFFICE
01
TRAINING ROOM
B
03
HALLWAY
04
TRAINING ROOM
C
05
HALLWAY
06
WOMENS
07
MENS
09
RESTROOM
11
JANITOR
12
OFFICE AND
BREAKROOM
10
EQ EQ
2
A3.00
1
2
3
A B C D E F
A.F.F.
GYP. BD.
8' - 11"
A.F.F.
GYP. BD.
8' - 11"
A.F.F.
GYP. BD.
8' - 11"
A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
9' - 11"A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
8' - 11"
EQ
EQ
2' - 0"
EQ EQ
EQ EQ EQ EQ
EQ
EQ
2' - 0"
2'
-
0
"
2' - 0"
2'
-
0
"
F3
F1 F1 F1 F1 F1
F2
F2
F2
F3
F3
F4
F4
F5
F5
F12 F12
F12
F12 F12
F6
F6
F6
F6
F6
F3
F3
F3
F2
F8
F7
F9 F9 F9 F9 F9 F9
F9
F10
F10
F10F10F10F10F10
8"
15
'
-
8
"
25
'
-
0
"
1'
-
3
"
42
'
-
7
"
72' - 5"18' - 10"
26
'
-
6
"
14
'
-
9
"
1"7' - 1"10' - 9"7' - 3"22' - 6"23' - 7"18' - 6"7"
17' - 11"72' - 5"
F9
A.F.F.
(E) PLASTER
12' - 8"
A.F.F.
GYP. BD.
8' - 11"
NO CEILING
EXPOSED STRUCTURE
12' -5" A.F.F.
EQ
EQ
EQ EQ
EQ EQ3' - 6 3/4"3' - 6"
06-03
06-03
NO CEILING
EXPOSED STRUCTURE
+7'-6"
+8'-0"
+8'-7"
+8'-7"
+8'-7"
+8'-7"
+10'-6"
+11'-5"
+10'-6" +10'-6"
+10'-6"
+10'-6"
+11'-5"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
EQ EQ EQ
EQ EQ
2' - 6"2' - 6"
EQ EQ EQ
EQ EQ
F9 F9
F9
F9
EQ EQ
F11 F11 F11 F11
F13
F11 F11 F11 F11
F5
F5
EX1 EX1
EX2
EQ EQ
EQ EQ
EQ
EQ
EQ
EQ
5'
-
0
"
16
A5.03
7' - 0"
16
A5.03
NOTE:
(E) TRUSSES AND NEW CEILING AND ROOF FRAMING
SHOWN FOR REFERENCE ONLY. REFER TO STRUCTURAL
DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E)
CONDITIONS TO BE FIELD VERIFIED.
EQ EQ
EQ EQ
09-02
09-02
4'
-
0
"
4'
-
0
"
1' - 0"
+8'-0"
F2
08-09
TYP.
23-10
05-06
TYP.
TYP.
F14
EX2
EX1
UNDER CABINET
LED LIGHT
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
1
:
3
3
P
M
A1.20
REFLECTED
CEILING PLAN
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/4" = 1'-0"A1.20
1 REFLECTED CEILING PLAN - PROPOSED 0'8'4'4'
TYPE COUNT DESCRIPTION COMMENTS
F1 5 LARGE SCHOOLHOUSE
PENDANT
REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F2 13 INDUSTRIAL PENDANT REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F3 24 SUSPENDED LINEAR
PENDANT
REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F4 2 SURFACE MOUNTED
EXTERIOR
REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F5 4 SURFACE MOUNTED
INTERIOR - 17" DIAM.
REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F6 7 6" RECESSED CAN
DOWNLIGHT
REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F7 1 SMALL SCHOOLHOUSE
PENDANT
REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F8 8 2x2 PANEL LIGHT REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F9 12 EXTERIOR DECORATIVE
SCONCE
REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F10 7 EXTERIOR WALL LIGHTS REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F11 24 RECESSED 12" LINEAR REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F12 5 CEILING FAN, PENDANT
MOUNTED
REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F13 1 RECESSED 4" LINEAR REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
F14 1 SURFACE WALL MOUNTED REFER TO ELECTRICAL DRAWINGS AND
CUT SHEETS FOR SELECTED PRODUCTS
05-06 LADDER ACCESS TO ROOF
06-03 1x6 SHEATHING ABOVE GYP WALL FINISH AT EAST AND SOUTH WALLS OF MULTI-PURPOSE RM A
08-09 30"x30" CEILING ACCESS PANEL
09-02 PATCH AND REPAIR PLASTER FINISH, ALL NEW MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS
POSSIBLE IN FINISH AND TEXTURE
23-10 DESIGN-BUILD MECHANICAL CATWALK REQUIRED FOR ACCESS TO ALL FAN COIL UNITS FROM
CEILING ACCESS POINT; FIELD VERIFY LOCATION WITH (E) TRUSSES AND NEW CEILING FRAMING
NOTE: REFER TO A0.00 FOR SITE LIGHTING FIXTURE SCHEDULE
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.001.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED WALL,
U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY
THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
6. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE NOT
BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON THE
EXTERIOR OF THE BUILDING.
7. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE WINDOWS.
COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY MEASURES IN PLACE
ON SITE.
8. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS ARE
TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.
9. PREP AND PAINT ALL PLASTER WALLS. PATCH AND REPAIR AREAS AS REQUIRED, FOR COST
ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING. REPAIR ANY DAMAGED OR MISSING
MOLDINGS TO MATCH ADJACENT PROFILE.
10. (E) TRUSSES AND NEW CEILING AND ROOF FRAMING SHOWN FOR REFERENCE ONLY. REFER TO
STRUCTURAL DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E) CONDITIONS TO BE FIELD
VERIFIED.
11. MECHANICAL EQUIPMENT, LIGHT FIXTURES AND UTILITY LOCATIONS TO BE COORDINATED IN THE
FIELD WITH (E) TRUSSES AND NEW FRAMING.
LEGENDKEYNOTES
xx
00
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
LIGHT FIXTURE TAG, REFER TO SHEET A1.20 FOR FIXTURE SCHEDULE Fx
AREA OF DEMO
AREA OF PATCH AND/OR REPAIR, REFER TO KEYNOTE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
123
10' - 2"02-11 02-10
02-20
02-07
02-0102-01
02-2802-12
TYP.
02-17
06 07
16
TYP.
02-47
FINISH FLOOR
0"
1
A3.00
8 9
07
16
2
A3.00
123
10' - 2"09-01
17
08-05
08-06
09-0409-04
F9
F10
TYP.
05-08
TYP.
09-03
09-06
BEHIND HVAC UNIT
09-02
23-03
23-07
26-02
23-08
EQ EQ
11
'
-
6
"
1' - 4"
7'
-
6
"
(E
)
1
6
'
-
2
"
V
I
F
1 2 3
02-06
02-26
02-16
02-14
02-1502-14
02-15
02-27
26
03
1
02-47
FINISH FLOOR
0"
1
A3.00
0201 03
E N G I N E C O M P A N Y N 48"0
2
A3.00
1 2 3
TYP.
07-04
07-08
TYP.
07-04
07-08
07-05
07-05
7'
-
0
"
EQ EQ
4'
-
6
"
1
F9
26 BEHIND GRILLE
10-02
10-03
05-05
09-05
TYP.
09-03
10-01
F9 F9
02-47
13
A5.05
13
A5.05
10
'
-
3
"
T
Y
P
.
6"
(E
)
2
0
'
-
1
1
"
,
V
I
F
,
T
O
P
O
F
R
O
O
F
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
1/4" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
1
:
3
9
P
M
A2.00
EXTERIOR
ELEVATIONS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/4" = 1'-0"A2.00
1 EAST ELEVATION - EXISTING/DEMO
1/4" = 1'-0"A2.00
2 EAST ELEVATION - REAR - PROPOSED
1/4" = 1'-0"A2.00
3 WEST ELEVATION - FRONT - EXISTING/DEMO
1/4" = 1'-0"A2.00
4 WEST ELEVATION - FRONT - PROPOSED
02-01 DEMO (E) NON-ORIGINAL CARPORT STRUCTURE AND SLAB
02-06 DEMO INFILL AT ORIGINAL OPENINGS
02-07 (E) WINDOW TO BE RESTORED, PROTECT AS REQUIRED; REFER TO A6.00 WINDOW SCHEDULE AND
A6.01 WINDOW INVENTORY FOR ADDITIONAL DIRECTION
02-10 (E) DOOR OPENING TO REMAIN, REFER TO A1.00 FOR NEW DOOR OR WINDOW REPLACEMENT
02-11 (E) NON-HISTORIC DOOR OPENING IN ORIGINAL WINDOW OPENING TO BE INFILLED
02-12 DEMO PORTION OF WALL FOR RELOCATED SALVAGED WINDOWS
02-14 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED; PROTECT (E) SHEATHING
IN PLACE; REFER TO A1.10 FOR ADDITIONAL SCOPE
02-15 ORIGINAL GUTTER TO BE SALVAGED, CLEANED AND RESTORED, GUTTER TO BE FREE OF DEBRIS
AND ORGANIC MATERIAL; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL
MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S
STANDARDS FOR REHABILITATION
02-16 (E) CONDUCTOR HEAD AND DOWNSPOUT TO BE SALVAGED, CLEANED AND RESTORED; IF
DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS
POSSIBLE
02-17 DEMO (E) PARAPET CAP
02-20 (E) ORIGINAL WINDOW OPENING FRAMING TO REMAIN FOR RELOCATED WINDOW, ORIGINAL
WINDOW MISSING
02-26 (E) UPPER DOWNSPOUT AND CONDUCTOR HEAD TO BE SALVAGED, CLEANED AND RESTORED;
LOWER DOWNSPOUT IS MISSING; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS
SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE
02-27 ORIGINAL WOOD ARCHED WINDOW AND DOOR DAMAGED BEYOND REPAIR, REMOVE MATERIAL
AND SALVAGE FOR REFERENCE; REBUILD NEW TO MATCH ORIGINAL
02-28 AREA IS MISSING WOOD SHEATHING AND PLASTER FINISH; CURRENTLY THE AREA IS COVERED
WITH VANDAL PROTECTION
02-47 (E) PLASTER DETAIL TO REMAIN, PATCH AND REPAIR AS REQUIRED
05-05 REPAIR AND RESTORE ORIGINAL DECORATIVE WROUGHT IRON WINDOW GRILLE
05-08 PARAPET CAP
07-04 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER PLYWOOD
SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; NEW REPLACEMENT TILE TO BE
SOURCED FROM GLADDING MCBEAN AT BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR
BLEND AND INSTALL NEW BIRD STOPS AT END TILES
07-05 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS CLOSE
AS POSSIBLE
07-08 ORIGINAL GUTTER TO BE SALVAGED, CLEANED AND RESTORED, GUTTER TO BE FREE OF DEBRIS
AND ORGANIC MATERIAL; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL
MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S
STANDARDS FOR REHABILITATION; INSTALL NEW METAL MESH DEBRIS COVER
08-05 RELOCATED SALVAGED WINDOW SET FROM SOUTH ELEVATION
08-06 RELOCATED SALVAGED WINDOW FROM NORTH ELEVATION
09-01 REPAIR AND PATCH (E) WALL STUDS, 1x6 SHEATHING AND PLASTER WALL FINISH; ALL NEW
MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS POSSIBLE; REFER TO STRUCTURAL DRAWINGS
FOR REPAIR DETAIL
09-02 PATCH AND REPAIR PLASTER FINISH, ALL NEW MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS
POSSIBLE IN FINISH AND TEXTURE
09-03 (E) PLASTER WALL FINISH TO REMAIN, PROTECT IN PLACE; PATCH AND REPAIR AREAS AS
REQUIRED, FOR COST ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING; ALL AREAS TO BE
PAINTED
09-04 AREA OF CARPORT DEMO STRUCTURAL ATTACHMENT; PATCH AND REPAIR PLASTER FINISH, ALL
NEW MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS POSSIBLE IN FINISH AND TEXTURE
09-05 CLEAN AND RESTORE ALL ORIGINAL INLAY TILE
09-06 INFILL WALL AT (E) DOOR OPENING, MATCH ADJACENT PROFILE AND TEXTURE, INCLUDING
PLASTER BASE
10-01 SIGNAGE, PAINTED METAL DIMENSIONAL PIN LETTERS, TO MATCH ORIGINAL
10-02 ADDRESS NUMBERS
10-03 4" x 5" HISTORIC DESIGNATION MARKER PER CITY OF SANTA ANA STANDARDS
23-03 HVAC CONDENSING UNIT, FLOOR MOUNTED TO 6" CONCRETE HOUSEKEEPING PAD, REFER TO
MECHANICAL & STRUCTURAL DWGS.
23-07 HVAC CONDENSING UNIT, WALL MOUNTED, REFER TO MECHANICAL AND STRUCUTRAL DWGS.
23-08 EXHAUST FAN, REFER TO MECHANICAL DRAWINGS
26-02 MAIN METER/ MAIN DISTRIBUTION PANELBOARD MOUNTED TO 4" CONCRETE HOUSEKEEPING PAD,
REFER TO ELECTRICAL AND STRUCTURAL DRAWINGS
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.001.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED WALL,
U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY
THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
6. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE NOT
BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON THE
EXTERIOR OF THE BUILDING.
7. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE WINDOWS.
COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY MEASURES IN PLACE
ON SITE.
8. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS ARE
TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.
9. PREP AND PAINT ALL PLASTER WALLS. PATCH AND REPAIR AREAS AS REQUIRED, FOR COST
ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING. REPAIR ANY DAMAGED OR MISSING
MOLDINGS TO MATCH ADJACENT PROFILE.
10. (E) TRUSSES AND NEW CEILING AND ROOF FRAMING SHOWN FOR REFERENCE ONLY. REFER TO
STRUCTURAL DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E) CONDITIONS TO BE FIELD
VERIFIED.
11. MECHANICAL EQUIPMENT, LIGHT FIXTURES AND UTILITY LOCATIONS TO BE COORDINATED IN THE
FIELD WITH (E) TRUSSES AND NEW FRAMING.
LEGENDKEYNOTES
xx
00
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
LIGHT FIXTURE TAG, REFER TO SHEET A1.20 FOR FIXTURE SCHEDULE Fx
AREA OF DEMO
AREA OF PATCH AND/OR REPAIR, REFER TO KEYNOTE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
FINISH FLOOR
0"
ROOF
15' -0"
1
A3.01
2524232221
2018
2
A3.01
ABCDEF
F10
F10 F10 F10 F10
TYP.
23-02
TYP.
05-08
08-03
TYP.
09-03TYP.
32-06
TYP.
07-04
TYP.
09-03
09-06 09-06
19.1
F9 F9
TYP.
02-47
2
A5.05
3
A5.02
13
A5.05
3' - 0 1/2"
EQ EQEQEQ
11
'
-
6
"
T
Y
P
.
8'
-
1
"
10
'
-
3
"
32-07
32-07
ABCDEF
TYP.
02-14
02-07
02-07
.02-01 02-09 02-10 02-10
TYP.
02-17
08 09
17 19
21 22 23 24
25
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
1/4" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
1
:
4
2
P
M
A2.01
EXTERIOR
ELEVATIONS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/4" = 1'-0"A2.01
2 NORTH ELEVATION - PROPOSED
02-01 DEMO (E) NON-ORIGINAL CARPORT STRUCTURE AND SLAB
02-07 (E) WINDOW TO BE RESTORED, PROTECT AS REQUIRED; REFER TO A6.00 WINDOW SCHEDULE AND
A6.01 WINDOW INVENTORY FOR ADDITIONAL DIRECTION
02-09 (E) WINDOW TO BE REMOVE AND SALVAGED FOR REINSTALLATION AT REAR ELEVATION, REFER
TO THE ELEVATIONS AND WINDOW SCHEDULE FOR LOCATION; REFER TO A6.00 WINDOW
SCHEDULE AND A6.01 WINDOW INVENTORY FOR ADDITIONAL DIRECTION
02-10 (E) DOOR OPENING TO REMAIN, REFER TO A1.00 FOR NEW DOOR OR WINDOW REPLACEMENT
02-14 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED; PROTECT (E) SHEATHING
IN PLACE; REFER TO A1.10 FOR ADDITIONAL SCOPE
02-17 DEMO (E) PARAPET CAP
02-47 (E) PLASTER DETAIL TO REMAIN, PATCH AND REPAIR AS REQUIRED
05-08 PARAPET CAP
07-04 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER PLYWOOD
SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; NEW REPLACEMENT TILE TO BE
SOURCED FROM GLADDING MCBEAN AT BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR
BLEND AND INSTALL NEW BIRD STOPS AT END TILES
08-03 INFILL PREVIOUS WINDOW; SALVAGE WINDOW AND CASING FOR REUSE AND RELOCATE TO REAR
ELEVATION
09-03 (E) PLASTER WALL FINISH TO REMAIN, PROTECT IN PLACE; PATCH AND REPAIR AREAS AS
REQUIRED, FOR COST ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING; ALL AREAS TO BE
PAINTED
09-06 INFILL WALL AT (E) DOOR OPENING, MATCH ADJACENT PROFILE AND TEXTURE, INCLUDING
PLASTER BASE
23-02 CONDITION OF ALL VENTS IS CURRENTLY UNKNOWN, TYP. SALVAGE, REPAIR, AND REINSTALL
WHERE POSSIBLE; NEW WORK TO MATCH ORIGINAL
32-06 8'-0" TALL METAL FENCE AT SIDES AND REAR PERIMETER OF SITE
32-07 8'-0" TALL PEDESTRIAN GATE, REFER TO SITE PLAN AND GATE SCHEDULE
1/4" = 1'-0"A2.01
1 NORTH ELEVATION - EXISTING/DEMO
1
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
1 PRESCREEN UPDATES 6/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.001.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED WALL,
U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY
THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
6. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE NOT
BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON THE
EXTERIOR OF THE BUILDING.
7. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE WINDOWS.
COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY MEASURES IN PLACE
ON SITE.
8. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS ARE
TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.
9. PREP AND PAINT ALL PLASTER WALLS. PATCH AND REPAIR AREAS AS REQUIRED, FOR COST
ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING. REPAIR ANY DAMAGED OR MISSING
MOLDINGS TO MATCH ADJACENT PROFILE.
10. (E) TRUSSES AND NEW CEILING AND ROOF FRAMING SHOWN FOR REFERENCE ONLY. REFER TO
STRUCTURAL DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E) CONDITIONS TO BE FIELD
VERIFIED.
11. MECHANICAL EQUIPMENT, LIGHT FIXTURES AND UTILITY LOCATIONS TO BE COORDINATED IN THE
FIELD WITH (E) TRUSSES AND NEW FRAMING.
LEGENDKEYNOTES
xx
00
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
LIGHT FIXTURE TAG, REFER TO SHEET A1.20 FOR FIXTURE SCHEDULE Fx
AREA OF DEMO
AREA OF PATCH AND/OR REPAIR, REFER TO KEYNOTE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
A B C D E F
.02-01
02-10 02-08 02-08 02-0802-09
TYP.
02-07
02-17
02-14
02-15
02-26
02-25 02-25
7' - 9"02-30
2
04
3 4
5 6
7
8 9
10
11 12 13
14 15
FINISH FLOOR
0"
1
A3.01
2
04
3 4 5 6
7
05
10
11 12 13
14 15
2
A3.01
A B C D E F
07-0607-06
TYP.
23-02
32-06
TYP.
05-08
TYP.
07-04
07-08
07-05
09-05
09-05
TYP.
09-03
09-01 08-01 08-01 08-01
F9 F9 F9 F9 F9 F9
F10
.06-02
3
A1.00
09-02 09-0209-02
TYP.
02-47
7'
-
4
"
T
Y
P
.
26-02
23-07
23-03
13
A5.05
2
A5.05
3
A5.02
32-07
32-07
8
A5.02
7
A5.02
12
A5.05
12
A5.05
23-08
EQEQ EQEQ
7'
-
4
"
7 3/4"7 3/4"
1' - 0"1' - 0"
11
'
-
6
"
T
Y
P
.
32-08
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
1/4" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
1
:
4
6
P
M
A2.02
EXTERIOR
ELEVATIONS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/4" = 1'-0"A2.02
1 SOUTH ELEVATION - EXISTING/DEMO
1/4" = 1'-0"A2.02
2 SOUTH ELEVATION - PROPOSED
02-01 DEMO (E) NON-ORIGINAL CARPORT STRUCTURE AND SLAB
02-07 (E) WINDOW TO BE RESTORED, PROTECT AS REQUIRED; REFER TO A6.00 WINDOW SCHEDULE AND
A6.01 WINDOW INVENTORY FOR ADDITIONAL DIRECTION
02-08 (E) WINDOW TO BE REMOVED, SALVAGED AND REPOSITIONED, REFER TO THE ELEVATIONS AND
WINDOW SCHEDULE FOR LOCATION; REFER TO A6.00 WINDOW SCHEDULE AND A6.01 WINDOW
INVENTORY FOR ADDITIONAL DIRECTION
02-09 (E) WINDOW TO BE REMOVE AND SALVAGED FOR REINSTALLATION AT REAR ELEVATION, REFER
TO THE ELEVATIONS AND WINDOW SCHEDULE FOR LOCATION; REFER TO A6.00 WINDOW
SCHEDULE AND A6.01 WINDOW INVENTORY FOR ADDITIONAL DIRECTION
02-10 (E) DOOR OPENING TO REMAIN, REFER TO A1.00 FOR NEW DOOR OR WINDOW REPLACEMENT
02-14 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED; PROTECT (E) SHEATHING
IN PLACE; REFER TO A1.10 FOR ADDITIONAL SCOPE
02-15 ORIGINAL GUTTER TO BE SALVAGED, CLEANED AND RESTORED, GUTTER TO BE FREE OF DEBRIS
AND ORGANIC MATERIAL; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL
MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S
STANDARDS FOR REHABILITATION
02-17 DEMO (E) PARAPET CAP
02-25 (E) UPPER DOWNSPOUT AND OVERFLOW SUPPER TO BE REMOVED; LOWER DOWNSPOUT AND
CONDUCTOR HEAD ARE MISSING; ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS
POSSIBLE
02-26 (E) UPPER DOWNSPOUT AND CONDUCTOR HEAD TO BE SALVAGED, CLEANED AND RESTORED;
LOWER DOWNSPOUT IS MISSING; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS
SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE
02-30 AREA DAMAGED FROM FIRE. REMAINING MATERIALS MAY NOT BE SALVAGEABLE. EXTERIOR
CONDITION IS CURRENTLY UNKNOWN DUE TO VANDAL PROTECTION.
02-47 (E) PLASTER DETAIL TO REMAIN, PATCH AND REPAIR AS REQUIRED
05-08 PARAPET CAP
06-02 REPAIR AND PATCH (E) WALL STUDS AND 1x6 SHEATHING; REFER TO STRUCTURAL DRAWINGS
FOR REPAIR DETAIL
07-04 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER PLYWOOD
SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; NEW REPLACEMENT TILE TO BE
SOURCED FROM GLADDING MCBEAN AT BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR
BLEND AND INSTALL NEW BIRD STOPS AT END TILES
07-05 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS CLOSE
AS POSSIBLE
07-06 DOWNSPOUT AND CONDUCTOR HEAD WITH ALL NEW MATERIALS TO MATCH ORIGINAL AS CLOSE
AS POSSIBLE TO CONNECT TO ROOF DRAIN; REPLACE OVERFLOW SCUPPER IN (E) LOCATION
07-08 ORIGINAL GUTTER TO BE SALVAGED, CLEANED AND RESTORED, GUTTER TO BE FREE OF DEBRIS
AND ORGANIC MATERIAL; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL
MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S
STANDARDS FOR REHABILITATION; INSTALL NEW METAL MESH DEBRIS COVER
08-01 REPOSITION EXISTING WINDOW OPENING TO MATCH ADJACENT WINDOW AND SILL HEIGHTS DUE
TO NEW INTERIOR LAYOUT
09-01 REPAIR AND PATCH (E) WALL STUDS, 1x6 SHEATHING AND PLASTER WALL FINISH; ALL NEW
MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS POSSIBLE; REFER TO STRUCTURAL DRAWINGS
FOR REPAIR DETAIL
09-02 PATCH AND REPAIR PLASTER FINISH, ALL NEW MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS
POSSIBLE IN FINISH AND TEXTURE
09-03 (E) PLASTER WALL FINISH TO REMAIN, PROTECT IN PLACE; PATCH AND REPAIR AREAS AS
REQUIRED, FOR COST ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING; ALL AREAS TO BE
PAINTED
09-05 CLEAN AND RESTORE ALL ORIGINAL INLAY TILE
23-02 CONDITION OF ALL VENTS IS CURRENTLY UNKNOWN, TYP. SALVAGE, REPAIR, AND REINSTALL
WHERE POSSIBLE; NEW WORK TO MATCH ORIGINAL
23-03 HVAC CONDENSING UNIT, FLOOR MOUNTED TO 6" CONCRETE HOUSEKEEPING PAD, REFER TO
MECHANICAL & STRUCTURAL DWGS.
23-07 HVAC CONDENSING UNIT, WALL MOUNTED, REFER TO MECHANICAL AND STRUCUTRAL DWGS.
23-08 EXHAUST FAN, REFER TO MECHANICAL DRAWINGS
26-02 MAIN METER/ MAIN DISTRIBUTION PANELBOARD MOUNTED TO 4" CONCRETE HOUSEKEEPING PAD,
REFER TO ELECTRICAL AND STRUCTURAL DRAWINGS
32-06 8'-0" TALL METAL FENCE AT SIDES AND REAR PERIMETER OF SITE
32-07 8'-0" TALL PEDESTRIAN GATE, REFER TO SITE PLAN AND GATE SCHEDULE
32-08 CUSTOM 8'-0" SLIDING GATE WITH WIRELESS ENTRY, REFER TO SITE PLAN AND GATE SCHEDULE
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.001.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED WALL,
U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY
THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
6. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE NOT
BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON THE
EXTERIOR OF THE BUILDING.
7. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE WINDOWS.
COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY MEASURES IN PLACE
ON SITE.
8. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS ARE
TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.
9. PREP AND PAINT ALL PLASTER WALLS. PATCH AND REPAIR AREAS AS REQUIRED, FOR COST
ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING. REPAIR ANY DAMAGED OR MISSING
MOLDINGS TO MATCH ADJACENT PROFILE.
10. (E) TRUSSES AND NEW CEILING AND ROOF FRAMING SHOWN FOR REFERENCE ONLY. REFER TO
STRUCTURAL DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E) CONDITIONS TO BE FIELD
VERIFIED.
11. MECHANICAL EQUIPMENT, LIGHT FIXTURES AND UTILITY LOCATIONS TO BE COORDINATED IN THE
FIELD WITH (E) TRUSSES AND NEW FRAMING.
LEGENDKEYNOTES
xx
00
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
LIGHT FIXTURE TAG, REFER TO SHEET A1.20 FOR FIXTURE SCHEDULE Fx
AREA OF DEMO
AREA OF PATCH AND/OR REPAIR, REFER TO KEYNOTE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
FINISH FLOOR
0"
ROOF
15' -0"
1
A3.01
ABCDE
03-01
TYP.
07-09
TYP.
07-04
TYP.
07-02
TYP.
05-08
HALLWAY
04
TRAINING ROOM
C
05
TRAINING ROOM
B
03
ENTRY / CHECK
IN OFFICE
01
TYP.
07-12
TYP.
07-12
A3.11
1A3.10
2
Sim
23-07
23-03
03-06
03-05
03-04
TYP.
03-05
2
A5.05
1
A5.05
13
A5.05
FINISH FLOOR
0"
ROOF
15' -0"
1
A3.01
2
A3.01
(E) FOUNDATION
-2' -0"
A B C D E F
MULTI-PURPOSE
ROOM A
02
JANITOR
12 OFFICE AND
BREAKROOM
10
WOMENS
07
MENS
09
03-03
TYP.
07-09
TYP.
05-08TYP.
07-02
TYP.
07-09
09-01
2
A1.00
07-04 08-07
08-07
06-04
06-05
06-06
06-07
07-03
05-06
07-12
07-12
A3.10
1A3.11
2
A3.11
3
03-05
03-01
TYP.
03-04
03-01
03-01
13
A5.05
1
A5.05
5
A5.05 2
A5.05
03-06
03-06
A5.05
14
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
1/4" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
1
:
5
2
P
M
A3.00
BUILDING
SECTIONS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/4" = 1'-0"A3.00
1 EAST/WEST SECTION #2
1/4" = 1'-0"A3.00
2 EAST/WEST SECTION #1
03-01 FOOTING & STEAM WALL, REFER TO STRUCTURAL DRAWINGS AND GEOTECH REPORT
03-03 3" DEPRESSED CONCRETE SLAB ON GRADE OVER VAPOR RETARDER FOR TILE FLOOR FINISH;
SLOPE TO DRAIN 1/8" PER FOOT MIN.; REFER TO STRUCTURAL DWGS AND GEOTECH REPORT
03-04 CLEAN AND POLISH (E) CONCRETE FLOOR. EXISTING SCORING TO REMAIN.
03-05 (E) FOOTING TO REMAIN, PROTECT IN PLACE
03-06 CONCRETE PAVING, REFER TO SITE PLAN
05-06 LADDER ACCESS TO ROOF
05-08 PARAPET CAP
06-04 (E) TRUSSES TO REMAIN, V.I.F., REFER TO STRUCTURAL DWGS.
06-05 CEILING JOISTS, REFER TO STRUCTURAL DWGS.
06-06 STRUCTURAL JOISTS, REFER TO STRUCTURAL DWGS.
06-07 (E) 1X6 SHEATHING EXPOSED
07-02 TPO MEMBRANE ROOFING SYSTEM OVER COVER BOARD OVER PLYWOOD SHEATHING PER
STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; PROVIDE TAPERED INSULATION AS REQUIRED TO
MAINTAIN MINIMUM SLOPE REQUIREMENTS
07-03 ROOF HATCH
07-04 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER PLYWOOD
SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; NEW REPLACEMENT TILE TO BE
SOURCED FROM GLADDING MCBEAN AT BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR
BLEND AND INSTALL NEW BIRD STOPS AT END TILES
07-09 EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
07-12 R-30 BATT INSULATION AT UNDERSIDE OF ROOF DECK
08-07 BLOCK OFF (E) ATTIC VENT
09-01 REPAIR AND PATCH (E) WALL STUDS, 1x6 SHEATHING AND PLASTER WALL FINISH; ALL NEW
MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS POSSIBLE; REFER TO STRUCTURAL DRAWINGS
FOR REPAIR DETAIL
23-03 HVAC CONDENSING UNIT, FLOOR MOUNTED TO 6" CONCRETE HOUSEKEEPING PAD, REFER TO
MECHANICAL & STRUCTURAL DWGS.
23-07 HVAC CONDENSING UNIT, WALL MOUNTED, REFER TO MECHANICAL AND STRUCUTRAL DWGS.
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
FINISH FLOOR
0"
ROOF
15' -0"
1
A3.00
(E) FOUNDATION
-2' -0"
2
A3.00
9'
-
1
1
"
123
TRAINING ROOM
B
03
MULTI-PURPOSE
ROOM A
02
07-09
05-08
07-04
07-04
05-08
07-02
07-09
A5.03
16
A3.10
1
Sim
A3.10
2
Sim
TYP.
03-05
03-04 03-02
2
A5.05
2
A5.05
13
A5.0513
A5.05
1
A5.05
FINISH FLOOR
0"
ROOF
15' -0"
1
A3.00
(E) FOUNDATION
-2' -0"
2
A3.00
123
TYP.
07-02
TYP.
07-09
05-08
05-08
07-12
A3.10
2
A3.10
3
Sim
A5.02
6
23-03
23-07
03-05 03-04
2
A5.05
2
A5.05
1
A5.05
23-08
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.001.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED WALL,
U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY
THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
6. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE NOT
BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON THE
EXTERIOR OF THE BUILDING.
7. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE WINDOWS.
COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY MEASURES IN PLACE
ON SITE.
8. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS ARE
TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.
9. PREP AND PAINT ALL PLASTER WALLS. PATCH AND REPAIR AREAS AS REQUIRED, FOR COST
ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING. REPAIR ANY DAMAGED OR MISSING
MOLDINGS TO MATCH ADJACENT PROFILE.
10. (E) TRUSSES AND NEW CEILING AND ROOF FRAMING SHOWN FOR REFERENCE ONLY. REFER TO
STRUCTURAL DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E) CONDITIONS TO BE FIELD
VERIFIED.
11. MECHANICAL EQUIPMENT, LIGHT FIXTURES AND UTILITY LOCATIONS TO BE COORDINATED IN THE
FIELD WITH (E) TRUSSES AND NEW FRAMING.
LEGENDKEYNOTES
xx
00
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
LIGHT FIXTURE TAG, REFER TO SHEET A1.20 FOR FIXTURE SCHEDULE Fx
AREA OF DEMO
AREA OF PATCH AND/OR REPAIR, REFER TO KEYNOTE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
1/4" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
1
:
5
4
P
M
A3.01
BUILDING
SECTIONS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/4" = 1'-0"A3.01
1 NORTH/ SOUTH SECTION #1
1/4" = 1'-0"A3.01
2 NORTH / SOUTH SECTION #2
03-02 CONCRETE SLAB ON GRADE INFILL OVER VAPOR RETARDER, REFER TO STRUCTURAL DRAWINGS
AND GEOTECH REPORT
03-04 CLEAN AND POLISH (E) CONCRETE FLOOR. EXISTING SCORING TO REMAIN.
03-05 (E) FOOTING TO REMAIN, PROTECT IN PLACE
05-08 PARAPET CAP
07-02 TPO MEMBRANE ROOFING SYSTEM OVER COVER BOARD OVER PLYWOOD SHEATHING PER
STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; PROVIDE TAPERED INSULATION AS REQUIRED TO
MAINTAIN MINIMUM SLOPE REQUIREMENTS
07-04 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER PLYWOOD
SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; NEW REPLACEMENT TILE TO BE
SOURCED FROM GLADDING MCBEAN AT BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR
BLEND AND INSTALL NEW BIRD STOPS AT END TILES
07-09 EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
07-12 R-30 BATT INSULATION AT UNDERSIDE OF ROOF DECK
23-03 HVAC CONDENSING UNIT, FLOOR MOUNTED TO 6" CONCRETE HOUSEKEEPING PAD, REFER TO
MECHANICAL & STRUCTURAL DWGS.
23-07 HVAC CONDENSING UNIT, WALL MOUNTED, REFER TO MECHANICAL AND STRUCUTRAL DWGS.
23-08 EXHAUST FAN, REFER TO MECHANICAL DRAWINGS
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
FINISH FLOOR
0"
ROOF
15' -0"
03-02
03-01
ST
R
U
C
T
U
R
A
L
D
W
G
S
.
VA
R
I
E
S
,
R
E
F
E
R
T
O
NOTE:
REFER TO STRUCTURAL DRAWINGS FOR ALL
SHEAR WALL ATTACHMENTS, BLOCKING AND
FRAMING
A5.05
2
(E
)
1
6
'
-
2
"
V
I
F
A5.02
10
TO
C
I
V
I
L
VA
R
I
E
S
,
R
E
F
E
R
09-09
09-10
07-09
06-04
03-04
03-06
09-03
PER PLAN
WALL TYPE
09-11
09-11
06-09
07-02
1
A5.05
FINISH FLOOR
0"
ROOF
15' -0"
(E) FOUNDATION
-2' -0"
NOTE:
REFER TO STRUCTURAL DRAWINGS FOR ALL
FRAMING, ATTACHMENTS, AND BLOCKING
(E
)
1
6
'
-
2
"
V
I
F
4'
-
1
"
1'
-
6
"
2'
-
1
0
"
A5.07
4
A5.07
3 A5.02
10
03-06
03-05
03-04
09-03
09-11
09-11
A5.05
2
07-02
07-12
06-06
1
A5.05
06-05
09-10
PER PLAN
WALL TYPE,
07-09
TO
C
I
V
I
L
VA
R
I
E
S
,
R
E
F
E
R
WD2 UPPER
CABINETS
SSM1 COUNTERTOP
WD2 BASE
CABINETS
FINISH FLOOR
0"
ROOF
15' -0"
TO
C
I
V
I
L
VA
R
I
E
S
,
R
E
F
E
R
16
'
-
2
"
03-05
03-06
09-11
09-09
03-04
09-10
09-03
07-09
06-05
09-11
06-06
07-12
07-02
A5.05
2
1
A5.05
A5.02
10
NOTE:
REFER TO STRUCTURAL DRAWINGS
FOR ALL FRAMING, ATTACHMENTS,
AND BLOCKING
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED WALL,
U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY
THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
6. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE NOT
BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON THE
EXTERIOR OF THE BUILDING.
7. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE WINDOWS.
COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY MEASURES IN PLACE
ON SITE.
8. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS ARE
TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.
9. PREP AND PAINT ALL PLASTER WALLS. PATCH AND REPAIR AREAS AS REQUIRED, FOR COST
ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING. REPAIR ANY DAMAGED OR MISSING
MOLDINGS TO MATCH ADJACENT PROFILE.
10. (E) TRUSSES AND NEW CEILING AND ROOF FRAMING SHOWN FOR REFERENCE ONLY. REFER TO
STRUCTURAL DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E) CONDITIONS TO BE FIELD
VERIFIED.
KEYNOTES
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
1
:
5
6
P
M
A3.10
WALL SECTIONS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
3/4" = 1'-0"A3.10
1 EXTERIOR PARAPET SHEAR WALL SECTION, TYPICAL
3/4" = 1'-0"A3.10
2 EXTERIOR PARAPET WALL SECTION, TYPICAL
3/4" = 1'-0"A3.10
3 EXTERIOR PARAPET WALL SECTION AT WINDOW, TYPICAL
03-01 FOOTING & STEAM WALL, REFER TO STRUCTURAL DRAWINGS AND GEOTECH REPORT
03-02 CONCRETE SLAB ON GRADE INFILL OVER VAPOR RETARDER, REFER TO STRUCTURAL DRAWINGS
AND GEOTECH REPORT
03-04 CLEAN AND POLISH (E) CONCRETE FLOOR. EXISTING SCORING TO REMAIN.
03-05 (E) FOOTING TO REMAIN, PROTECT IN PLACE
03-06 CONCRETE PAVING, REFER TO SITE PLAN
06-04 (E) TRUSSES TO REMAIN, V.I.F., REFER TO STRUCTURAL DWGS.
06-05 CEILING JOISTS, REFER TO STRUCTURAL DWGS.
06-06 STRUCTURAL JOISTS, REFER TO STRUCTURAL DWGS.
06-09 STRUCTURAL SHEAR WALL, REFER TO STRCUTRAL DRAW INGS
07-02 TPO MEMBRANE ROOFING SYSTEM OVER COVER BOARD OVER PLYWOOD SHEATHING PER
STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; PROVIDE TAPERED INSULATION AS REQUIRED TO
MAINTAIN MINIMUM SLOPE REQUIREMENTS
07-09 EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
07-12 R-30 BATT INSULATION AT UNDERSIDE OF ROOF DECK
09-03 (E) PLASTER WALL FINISH TO REMAIN, PROTECT IN PLACE; PATCH AND REPAIR AREAS AS
REQUIRED, FOR COST ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING; ALL AREAS TO BE
PAINTED
09-09 WALL BASE, REFER TO INTERIOR ELEVATIONS AND FINISH SCHEDULE
09-10 CEILING, REFER TO RCP AND FINISH SCHEDULE
09-11 (E) PLASTER DETAIL TO REMAIN; PATCH AND REPAIR AS REQUIRED
No. Description Date
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
FINISH FLOOR
0"
ROOF
15' -0"
(E) FOUNDATION
-2' -0"
A B
A5.05
18
07-04
09-02
09-11
32-04
03-05
03-01
03-02
09-09
03-04
09-02
06-09
09-07
06-06
06-04
13
A5.05
06-11
FINISH FLOOR
0"
ROOF
15' -0"
TO
C
I
V
I
L
VA
R
I
E
S
,
R
E
F
E
R
NOTE:
REFER TO STRUCTURAL
DRAWINGS FOR ALL FRAMING,
ATTACHMENTS, AND BLOCKING
03-05
03-04
09-09
09-11
31-01
07-09
09-03
09-10
09-11
09-05
06-10
A5.05
18
07-04
07-12
13
A5.05
FINISH FLOOR
0"
ROOF
15' -0"
E
A5.03
16
NOTE:
REFER TO STRUCTURAL
DRAWINGS FOR ALL FRAMING,
ATTACHMENTS, AND BLOCKING
03-01
03-03
05-06
07-03
07-02
07-12
06-06
06-04
06-05
09-10
1
A5.05
5
A5.05
PER PLAN
WALL TYPE
PER PLAN
WALL TYPE PER PLAN
WALL TYPE
WOMENS
07
MENS
09
JANITOR
12
09-07
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS ARE TO FACE OF FINISHED WALL,
U.O.N. DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY
THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
6. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE NOT
BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON THE
EXTERIOR OF THE BUILDING.
7. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE WINDOWS.
COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY MEASURES IN PLACE
ON SITE.
8. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS ARE
TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.
9. PREP AND PAINT ALL PLASTER WALLS. PATCH AND REPAIR AREAS AS REQUIRED, FOR COST
ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING. REPAIR ANY DAMAGED OR MISSING
MOLDINGS TO MATCH ADJACENT PROFILE.
10. (E) TRUSSES AND NEW CEILING AND ROOF FRAMING SHOWN FOR REFERENCE ONLY. REFER TO
STRUCTURAL DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E) CONDITIONS TO BE FIELD
VERIFIED.
KEYNOTES
3/4" = 1'-0"A3.11
3 RESTROOM WALL SECTION
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
1
:
5
8
P
M
A3.11
WALL SECTIONS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
3/4" = 1'-0"A3.11
2 EXTERIOR WALL SECTION @ BARN DOORS
3/4" = 1'-0"A3.11
1 EXTERIOR WALL SECTION @ ENTRY
03-01 FOOTING & STEAM WALL, REFER TO STRUCTURAL DRAWINGS AND GEOTECH REPORT
03-02 CONCRETE SLAB ON GRADE INFILL OVER VAPOR RETARDER, REFER TO STRUCTURAL DRAWINGS
AND GEOTECH REPORT
03-03 3" DEPRESSED CONCRETE SLAB ON GRADE OVER VAPOR RETARDER FOR TILE FLOOR FINISH;
SLOPE TO DRAIN 1/8" PER FOOT MIN.; REFER TO STRUCTURAL DWGS AND GEOTECH REPORT
03-04 CLEAN AND POLISH (E) CONCRETE FLOOR. EXISTING SCORING TO REMAIN.
03-05 (E) FOOTING TO REMAIN, PROTECT IN PLACE
05-06 LADDER ACCESS TO ROOF
06-04 (E) TRUSSES TO REMAIN, V.I.F., REFER TO STRUCTURAL DWGS.
06-05 CEILING JOISTS, REFER TO STRUCTURAL DWGS.
06-06 STRUCTURAL JOISTS, REFER TO STRUCTURAL DWGS.
06-09 STRUCTURAL SHEAR WALL, REFER TO STRCUTRAL DRAW INGS
06-10 (E) DECORATIVE WOOD EAVE TRIM
06-11 2x4 CRIPPLE WALL AND WOOD BEAM, REFER TO STRUCTURAL DRAWINGS
07-02 TPO MEMBRANE ROOFING SYSTEM OVER COVER BOARD OVER PLYWOOD SHEATHING PER
STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; PROVIDE TAPERED INSULATION AS REQUIRED TO
MAINTAIN MINIMUM SLOPE REQUIREMENTS
07-03 ROOF HATCH
07-04 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED, OVER PLYWOOD
SHEATHING PER STRUCTURAL DWGS, OVER (E) 1X6 SHEATHING; NEW REPLACEMENT TILE TO BE
SOURCED FROM GLADDING MCBEAN AT BROKEN TILES TO MATCH ORIGINAL SHAPE AND COLOR
BLEND AND INSTALL NEW BIRD STOPS AT END TILES
07-09 EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
07-12 R-30 BATT INSULATION AT UNDERSIDE OF ROOF DECK
09-02 PATCH AND REPAIR PLASTER FINISH, ALL NEW MATERIALS SHALL MATCH ORIGINAL AS CLOSE AS
POSSIBLE IN FINISH AND TEXTURE
09-03 (E) PLASTER WALL FINISH TO REMAIN, PROTECT IN PLACE; PATCH AND REPAIR AREAS AS
REQUIRED, FOR COST ESTIMATE ASSUME 10% OF THE AREA NEEDS PATCHING; ALL AREAS TO BE
PAINTED
09-05 CLEAN AND RESTORE ALL ORIGINAL INLAY TILE
09-07 3" PICTURE MOLDING TO CAP OFF GYP BD AT OPEN CEILING
09-09 WALL BASE, REFER TO INTERIOR ELEVATIONS AND FINISH SCHEDULE
09-10 CEILING, REFER TO RCP AND FINISH SCHEDULE
09-11 (E) PLASTER DETAIL TO REMAIN; PATCH AND REPAIR AS REQUIRED
31-01 PLANTING AREA, REFER TO LANDSCAPE DWGS.
32-04 CONCRETE VEHICULAR PAVING
No. Description Date
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS SHOWN AT (E) CONDITIONS ARE
TO FACE OF (E) FINISH. DIMENSIONS AT NEW WORK ARE TO FACE OF FRAMING, U.O.N.
DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY THE
CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. REFER TO DETAIL FOR TYPICAL MOUNTING HEIGHTS.
A. ALL BASE LEVEL WALL OUTLETS TO BE MOUNTED 15" MIN. FROM FINISH FLOOR, U.N.O.
ALL FINAL OUTLET LOCATIONS TO BE VIF W/ ARCHITECT.
B. ALL COUNTER LEVEL WALL OUTLETS TO BE MOUNTED 46" MAX. FROM FINISH FLOOR,
U.N.O. ALL FINAL OUTLET LOCATIONS IN DECORATIVE TILE BACKSPLASH TO BE VIF W/
ARCHITECT.
C. ALL LIGHT SWITCHES TO BE 6" O.C. FROM EDGE OF CASING OR WALL AND MOUNTED 48"
MAX. FROM FINISH FLOOR, U.N.O. ALL FINAL SWITCH LOCATIONS TO BE VIF W/
ARCHITECT.
6. COORDINATE LOCATION AND PROVIDE BLOCKING, BACKINGS AND/OR REINFORCEMENTS IN
PARTITIONS FOR ALL CABINETS, COUNTERTOPS AND ANY WALL MOUNTED ITEMS.
KEYNOTES
/17 A5.00
2
A3.00
1
E
A4.00
A
B
C
D
WOMENS
07
MENS
09
HALLWAY
06
A4.00
A
B
C
D
A4.02
A
B
C
D
1' - 6"
1' - 1"
4"
9' - 7 3/4"1' - 10 3/4"8' - 4 1/2"1' - 1 3/4"
(E
)
1
8
'
-
8
"
V
.
I
.
F
.
8 3/4"
20 19.1
1716
12
A5.00
22-06
A4A2 A4b A3
B1
B4
B1 B1b
C1
20
"
A
L
C
O
V
E
B1b B1b
30"x48"
CLR FLR
30
"
x
4
8
"
CL
R
F
L
R
30
"
x
4
8
"
CL
R
F
L
R
5'
-
4
"
3'
-
1
"
2' - 0"
4"
36
"
x
4
8
"
CL
R
F
L
R
2' - 1"
5'
-
4
"
2' - 0"
30
"
x
4
8
"
CL
R
F
L
R
30
"
x
4
8
"
CL
R
F
L
R
4' - 1"
2'
-
1
1
1
/
2
"
2'
-
9
"
5'
-
1
1
/
2
"
18
"
M
A
X
17
"
M
I
N
3'
-
6
1
/
4
"
5'
-
4
"
18
"
M
A
X
17
"
M
I
N
B3
C2
B3
B5
C2
B3
B3
B1
10-17 10-17
22-02
22-02
EQ
EQ
EQ
EQ
5"
3"
ø 5' - 0"
ø 5' - 0"
20
WD1 TRIM
CT1 WALL TILE
PT11 TYP.
10-14
10-08
22-04
WD1 TRIM
CT1 WALL TILE
PT11 TYP.
10-06
10-14
22-04
10-07
22-03
2'
-
1
0
"
M
A
X
.
KNEE
SPACE
SSM1 COUNTERTOP
10-16
16
WD1 TRIM
CT1 WALL TILE
PT11 TYP.
10-11
6"
26-08
NOTE: REFER TO & FOR ALL ACCESSIBLE TOILET COMPARTMENT CLEARANCES AND ACCESSORY MOUNTING HEIGHTS.
WD1 TRIM
CT1 WALL TILE
PT11 TYP.
3
1
/
2
"
6'
-
3
"
T
Y
P
.
10-06
2
A5.01
6
A5.01
19.1
WD1 TRIM
CT1 WALL TILE
PT11 TYP.
10-14
10-08
22-04
WD1 TRIM
CT1 WALL TILE
PT11 TYP.
F5 F5
10-06 10-11
3
1
/
2
"
6'
-
3
"
T
Y
P
.
17
WD1 TRIM
CT1 WALL TILE
PT11 TYP.
26-08
6"
WD1 TRIM
CT1 WALL TILE
PT11 TYP.
10-14
22-04
10-06
22-05
22-03
10-07
SSM1 COUNTERTOP
2'
-
1
0
"
M
A
X
.
NOTE: REFER TO & FOR ALL ACCESSIBLE TOILET COMPARTMENT CLEARANCES AND ACCESSORY MOUNTING HEIGHTS.
KNEE
SPACE
10-16
RESTROOM GENERAL NOTES
1. ALL DIMENSIONS SHOWN ON THIS SHEET INDICATE FIXTURE AND ACCESSORIES MINIMUM
REQUIREMENTS FOR ACCESSIBILITY. REFER TO SHEET A5.01 FOR ADDITIONAL REQUIREMENTS.
2. ALL WATER AND DRAIN PIPES UNDER LAVATORY SHALL BE INSULATED. THERE SHALL BE NO
SHARP OR ABRASIVE OBJECTS OR SURFACES UNDER THE LAVATORY.
3. A CLEAR FLOOR SPACE 30" BY 48" COMPLY WITH CBC 11B-305.3 SHALL BE PROVIDED IN FRONT OF
A LAVATORY TO ALLOW FORWARD APPROACH. SUCH CLEAR FLOOR SPACE SHALL ADJOIN OR
OVERLAP AN ACCESSIBLE ROUTE PER CBC 11B-305.
4. WATER CLOSET AND URINAL FLUSH VALVE CONTROLS, AND FAUCET AND OPERATING
MECHANISM CONTROLS, SHALL BE OPERABLE WITH ONE HAND, SHALL NOT REQUIRE TIGHT
GRASPING, PINCHING, OR TWISTING OF THE WRIST, AND SHALL BE MOUNTED NO MORE THAN 44"
ABOVE THE FLOOR (PER CBC 11B-308) AND REQUIRE A FORCE TO OPERATE TO BE NO GREATER
THAN 5 LBF. MAX. (PER CBC 11B-309.4). CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS
AND CORRECT AS NECESSARY TO COMPLY WITH CODE.
5. MULTI-USER RESTROOM FLOORS SHALL SLOPE TO DRAIN, 1/8" PER FOOT MIN.
LEGEND
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
NEW CONCRETE SLAB ON GRADE INFILL, REFER TO STRUCTURAL DRAWINGS
NEW DEPRESSED CONCRETE SLAB ON GRADE FOR NEW TILE FLOOR FINISH;
SLOPE TO DRAIN 1/8" PER FOOT MIN.; REFER TO STRUCTURAL DWGS.
1i
xx
00
WALL TYPE TAG, REFER TO
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
FINISH MATERIAL TAG, REFER TO SHEET A6.10 FOR FINISH SPECIFICATIONSXX-0
5
A5.03
1-HOUR RATED WALL
-EXTERIOR WALLS ALONG GRIDS 1 AND 3 ARE TO BE 1-HOUR FIRE-
RESISTANCE RATED DUE TO FIRE SEPARATION DISTANCE
-EXTERIOR OPENINGS ARE TO BE PROTECTED BY AN EXTERIOR
FIRE SPRINKLER SYSTEM PER CHBC 8-402.1 (DEFERRED SUBMITTAL)
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
0
4
P
M
A4.00
INTERIOR
ELEVATIONS -
RESTROOMS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/2" = 1'-0"A4.00
1 ENLARGED FLOOR PLAN - RESTROOMS
A B
C D
2 WOMENS INTERIOR ELEVATIONS
1/2" = 1'-0"
3 MENS INTERIOR ELEVATIONS
1/2" = 1'-0"
A B
C D
10-06 PHENOLIC TOILET PARTITION, MOUNTED OVERHEAD-BRACED
10-07 BABY CHANGING STATION, REFER TO PROJECT MANUAL FOR CUT SHEET
10-08 RECESSED COMBINATION WASTE DISPOSAL, TISSUE AND TOILET-SEAT COVER, REFER TO
PROJECT MANUAL FOR CUT SHEET
10-11 SEMI-RECESSED PAPER TOWEL DISPENSER AND WASTE RECEPTACLE, REFER TO PROJECT
MANUAL FOR CUT SHEET
10-14 GRAB BAR, REFER TO PROJECT MANUAL FOR CUT SHEET
10-16 COUNTERTOP MOUNTED SOAP DISPENSER, REFER TO PROJECT MANUAL FOR CUT SHEET
10-17 ACCESSIBLE TOILET COMPARTMENT, REFER TO DETAIL FOR ALL CODE REQUIRED CLEARANCES
22-02 FLOOR DRAIN, REFER TO PLUMBING DWGS.
22-03 UNDER MOUNT SINK AND FAUCET, REFER TO PLUMBING DWGS.
22-04 WALL MOUNTED TOILET AND FLUSH VALVE, REFER TO PLUMBING DWGS.
22-05 URINAL, REFER TO PLUMBING DWGS.
22-06 HI/LOW DRINKING FOUNTAIN AND BOTTLE FILLER, REFER TO PLUMBING DWGS.
26-08 SWITCH, REFER TO ELECTRICAL DWGS.
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
REF.
T FC-5
2
A3.00
1
E F
A4.01
A
B
C
D
A4.01
A
B
C
D
RESTROOM
11
JANITOR
12
OFFICE AND
BREAKROOM
10
20
21
18
19
A4.01
A.
B.D.
16
05-06
22-09
22-08
5
A5.05
1' - 1 3/4"7' - 5 3/8"10' - 2 7/8"
8 3/4"
4'
-
8
3
/
4
"
18
"
M
A
X
.
17
"
M
I
N
.
7'
-
1
0
1
/
2
"
5'
-
0
"
4' - 0"4' - 7 1/8"
1' - 6"
9"
4"
9"
3'
-
0
"
9"
ø 5' - 0"
18
10-14
10-08
22-04
PT11 TYP
WD1 TRIM
CT1 WALL TILE
8'
-
1
1
"
6'
-
3
"
3
1
/
2
"
PT11 TYP
WD1 TRIM
CT1 WALL TILE
21
PT11 TYP
WD1 TRIM
CT1 WALL TILE
10-10
22-07
6"
26-06
26-08
PT11 TYP
WD1 TRIM
CT1 WALL TILE
10-14
22-04
22-07
10-12
4
A5.01
NOTE: REFER TO & FOR ALL ACCESSIBLE TOILET
ROOM CLEARANCES AND ACCESSORY MOUNTING HEIGHTS.
2
A5.01
6
A5.01
22-08
22-09
20
PT11
WB1
OPEN ABOVE
CEILING JOIST,
REFER TO
STRUCT. DWGS
F14
05-06
07-03
PT11
WB1
5
A5.05
07-03
22-0822-08
22-09
05-06
+/- 3' - 3" VIF2' - 3"2' - 0"
FILLER
+/- 2"
2' - 0"
1'
-
1
1
"
7'
-
0
"
4'
-
7
"
1'
-
6
"
2'
-
1
0
"
11-02
PT11 TYP
WB4 BASE
WD2 UPPER
CABINETS
SSM2 COUNTERTOPS
WD2 BASE
CABINETS
4
A5.07
3
A5.07
2 EQ. CABINETS
5' - 4"
WD2 OPEN
SHELVING
OPEN FOR
MICROWAVE
2' - 0"
17 16 9 8
07
WB4 BASE
PT11 TYP
1' - 4"
9"9"
TYP.
26-0626-08
9"
10-05
EX2
15
14
PT11 TYP.
WB4 BASE
1'
-
3
"
8"2' - 0"8"7' - 0"
26-07
26-06 OPEN TO
VESTIBULE
1' - 6"3' - 4"1' - 6"
FILLER
+/- 2"
2' - 0"
18
19
5
A5.01
2'
-
1
0
"
1'
-
6
"
4'
-
7
"
KNEE
SPACE
22-03
3
A5.07
PT11 TYP
SSM2 COUNTERTOP
WD2 BASE CABINET
WD2 OPEN
SHELVING
5
A5.07
7'
-
0
"
1' - 6"3' - 4"
BLIND CORNER
3' - 8"
26-08
TYP.
26-06
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS SHOWN AT (E) CONDITIONS ARE
TO FACE OF (E) FINISH. DIMENSIONS AT NEW WORK ARE TO FACE OF FRAMING, U.O.N.
DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY THE
CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. REFER TO DETAIL FOR TYPICAL MOUNTING HEIGHTS.
A. ALL BASE LEVEL WALL OUTLETS TO BE MOUNTED 15" MIN. FROM FINISH FLOOR, U.N.O.
ALL FINAL OUTLET LOCATIONS TO BE VIF W/ ARCHITECT.
B. ALL COUNTER LEVEL WALL OUTLETS TO BE MOUNTED 46" MAX. FROM FINISH FLOOR,
U.N.O. ALL FINAL OUTLET LOCATIONS IN DECORATIVE TILE BACKSPLASH TO BE VIF W/
ARCHITECT.
C. ALL LIGHT SWITCHES TO BE 6" O.C. FROM EDGE OF CASING OR WALL AND MOUNTED 48"
MAX. FROM FINISH FLOOR, U.N.O. ALL FINAL SWITCH LOCATIONS TO BE VIF W/
ARCHITECT.
6. COORDINATE LOCATION AND PROVIDE BLOCKING, BACKINGS AND/OR REINFORCEMENTS IN
PARTITIONS FOR ALL CABINETS, COUNTERTOPS AND ANY WALL MOUNTED ITEMS.
KEYNOTES
/17 A5.00
RESTROOM GENERAL NOTES
1. ALL DIMENSIONS SHOWN ON THIS SHEET INDICATE FIXTURE AND ACCESSORIES MINIMUM
REQUIREMENTS FOR ACCESSIBILITY. REFER TO SHEET A5.01 FOR ADDITIONAL REQUIREMENTS.
2. ALL WATER AND DRAIN PIPES UNDER LAVATORY SHALL BE INSULATED. THERE SHALL BE NO
SHARP OR ABRASIVE OBJECTS OR SURFACES UNDER THE LAVATORY.
3. A CLEAR FLOOR SPACE 30" BY 48" COMPLY WITH CBC 11B-305.3 SHALL BE PROVIDED IN FRONT OF
A LAVATORY TO ALLOW FORWARD APPROACH. SUCH CLEAR FLOOR SPACE SHALL ADJOIN OR
OVERLAP AN ACCESSIBLE ROUTE PER CBC 11B-305.
4. WATER CLOSET AND URINAL FLUSH VALVE CONTROLS, AND FAUCET AND OPERATING
MECHANISM CONTROLS, SHALL BE OPERABLE WITH ONE HAND, SHALL NOT REQUIRE TIGHT
GRASPING, PINCHING, OR TWISTING OF THE WRIST, AND SHALL BE MOUNTED NO MORE THAN 44"
ABOVE THE FLOOR (PER CBC 11B-308) AND REQUIRE A FORCE TO OPERATE TO BE NO GREATER
THAN 5 LBF. MAX. (PER CBC 11B-309.4). CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS
AND CORRECT AS NECESSARY TO COMPLY WITH CODE.
5. MULTI-USER RESTROOM FLOORS SHALL SLOPE TO DRAIN, 1/8" PER FOOT MIN.
LEGEND
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
NEW CONCRETE SLAB ON GRADE INFILL, REFER TO STRUCTURAL DRAWINGS
NEW DEPRESSED CONCRETE SLAB ON GRADE FOR NEW TILE FLOOR FINISH;
SLOPE TO DRAIN 1/8" PER FOOT MIN.; REFER TO STRUCTURAL DWGS.
1i
xx
00
WALL TYPE TAG, REFER TO
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
FINISH MATERIAL TAG, REFER TO SHEET A6.10 FOR FINISH SPECIFICATIONSXX-0
5
A5.03
1-HOUR RATED WALL
-EXTERIOR WALLS ALONG GRIDS 1 AND 3 ARE TO BE 1-HOUR FIRE-
RESISTANCE RATED DUE TO FIRE SEPARATION DISTANCE
-EXTERIOR OPENINGS ARE TO BE PROTECTED BY AN EXTERIOR
FIRE SPRINKLER SYSTEM PER CHBC 8-402.1 (DEFERRED SUBMITTAL)
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
0
9
P
M
A4.01
INT. ELEVATIONS -
STAFF RESTROOM
& JAN.
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/2" = 1'-0"A4.01
1 ENLARGED FLOOR PLAN - STAFF RESTROOM & JAN.
A B
C D
2 RESTROOM INTERIOR ELEVATIONS
1/2" = 1'-0"
A B
C D
A B
C D
2 OFFICE & BREAKROOM INTERIOR ELEVATIONS
1/2" = 1'-0"
2 JANITOR INTERIOR ELEVATIONS
1/2" = 1'-0"
05-06 LADDER ACCESS TO ROOF
07-03 ROOF HATCH
10-05 EXIT SIGN, REFER TO T2.00 EGRESS/SIGNAGE PLAN
10-08 RECESSED COMBINATION WASTE DISPOSAL, TISSUE AND TOILET-SEAT COVER, REFER
TO PROJECT MANUAL FOR CUT SHEET
10-10 RECESSED PAPER TOWEL DISPENSER AND WASTE RECEPTACLE, REFER TO PROJECT
MANUAL FOR CUT SHEET
10-12 RECESSED SOAP DISPENSER, REFER TO PROJECT MANUAL FOR CUT SHEET
10-14 GRAB BAR, REFER TO PROJECT MANUAL FOR CUT SHEET
11-02 REFRIGERATOR, OWNER FURNISHED CONTRACTOR INSTALLED
22-03 UNDER MOUNT SINK AND FAUCET, REFER TO PLUMBING DWGS.
22-04 WALL MOUNTED TOILET AND FLUSH VALVE, REFER TO PLUMBING DWGS.
22-07 WALL MOUNTED LAVATORY, REFER TO PLUMBING DWGS.
22-08 MOP SINK AND WALL MOUNTED UTILITY FAUCET, REFER TO PLUMBING DWGS.
22-09 WALL MOUNTED WATER HEATER, REFER TO PLUMBING DWGS.; COORDINATE
MOUNTING HEIGHT IN FIELD WITH ARCHITECT AND PLUMBING ENGINEER
26-06 POWER OUTLET, REFER TO ELECTIRCAL DWGS.
26-07 DATA OUTLET, REFER TO ELECTRICL DWGS.
26-08 SWITCH, REFER TO ELECTRICAL DWGS.
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
OPEN TO
MULTI-PURPOSE
ROOM A
11
PT11
WB4
2' - 0"26-06
PT11
WB4
6"4' - 6"
26-06
26-07
2
04
PT11
WB4
6"2' - 4"
1
03
PT11
WB4
EX2
10-05
OPEN TO
MULTI-PURPOSE
ROOM A
9'
-
1
1
"
PT11 TYP.
13
FILLER
+/- 1"6' - 10"
FILLER
+/- 1"
WB4 BASE
PT11 TYP
SSM1 COUNTERTOP
WD2 CASEWORK
8
A5.07
710
05
PT11 TYP.
10-05
EX1
FILLER
+/- 1"6' - 10"
FILLER
+/- 1"
8
A5.07
4'
-
0
"
PT11 TYP.
WB2 BASE
SSM1 COUNTERTOP
WD2 CASEWORK
26-01
1' - 6"
26-06
16 17
22-06
10-15
10-15
WB2
PT11 TYP.
12
A5.00
EQ EQ
7'
-
0
"
EQEQ
26-06
18
PT11 TYP.
WB2
PT11
WB2
OPEN TO
MULTI-PURPOSE
ROOM A
PT11
WB2
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS SHOWN AT (E) CONDITIONS ARE
TO FACE OF (E) FINISH. DIMENSIONS AT NEW WORK ARE TO FACE OF FRAMING, U.O.N.
DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY THE
CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. REFER TO DETAIL FOR TYPICAL MOUNTING HEIGHTS.
A. ALL BASE LEVEL WALL OUTLETS TO BE MOUNTED 15" MIN. FROM FINISH FLOOR, U.N.O.
ALL FINAL OUTLET LOCATIONS TO BE VIF W/ ARCHITECT.
B. ALL COUNTER LEVEL WALL OUTLETS TO BE MOUNTED 46" MAX. FROM FINISH FLOOR,
U.N.O. ALL FINAL OUTLET LOCATIONS IN DECORATIVE TILE BACKSPLASH TO BE VIF W/
ARCHITECT.
C. ALL LIGHT SWITCHES TO BE 6" O.C. FROM EDGE OF CASING OR WALL AND MOUNTED 48"
MAX. FROM FINISH FLOOR, U.N.O. ALL FINAL SWITCH LOCATIONS TO BE VIF W/
ARCHITECT.
6. COORDINATE LOCATION AND PROVIDE BLOCKING, BACKINGS AND/OR REINFORCEMENTS IN
PARTITIONS FOR ALL CABINETS, COUNTERTOPS AND ANY WALL MOUNTED ITEMS.
KEYNOTES
/17 A5.00
LEGEND
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
NEW CONCRETE SLAB ON GRADE INFILL, REFER TO STRUCTURAL DRAWINGS
NEW DEPRESSED CONCRETE SLAB ON GRADE FOR NEW TILE FLOOR FINISH;
SLOPE TO DRAIN 1/8" PER FOOT MIN.; REFER TO STRUCTURAL DWGS.
1i
xx
00
WALL TYPE TAG, REFER TO
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
FINISH MATERIAL TAG, REFER TO SHEET A6.10 FOR FINISH SPECIFICATIONSXX-0
5
A5.03
1-HOUR RATED WALL
-EXTERIOR WALLS ALONG GRIDS 1 AND 3 ARE TO BE 1-HOUR FIRE-
RESISTANCE RATED DUE TO FIRE SEPARATION DISTANCE
-EXTERIOR OPENINGS ARE TO BE PROTECTED BY AN EXTERIOR
FIRE SPRINKLER SYSTEM PER CHBC 8-402.1 (DEFERRED SUBMITTAL)
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
1
3
P
M
A4.02
INTERIOR
ELEVATIONS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
A B C D
A B
C D
A B C D
3 HALLWAY #04 INTERIOR ELEVATIONS
1/2" = 1'-0"
2 HALLWAY #06 INTERIOR ELEVATIONS
1/2" = 1'-0"
1 ENTRY / CHECK IN OFFICE INTERIOR ELEVATIONS
1/2" = 1'-0"
10-05 EXIT SIGN, REFER TO T2.00 EGRESS/SIGNAGE PLAN
10-15 RESTROOM SIGNAGE, REFER TO T2.00 EGRESS/SIGNAGE PLAN
22-06 HI/LOW DRINKING FOUNTAIN AND BOTTLE FILLER, REFER TO PLUMBING DWGS.
26-01 PANELBOARD, REFER TO ELECTRICAL DRAWINGS
26-06 POWER OUTLET, REFER TO ELECTIRCAL DWGS.
26-07 DATA OUTLET, REFER TO ELECTRICL DWGS.
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
25
24 23 22 21
TYP.
06-04
TYP.
06-05
TYP.
06-0608-0708-07
09-07
TYP.
06-07
WB3PT11
12
'
-
9
"
NOTE:
(E) TRUSSES AND NEW CEILING AND ROOF FRAMING
SHOWN FOR REFERENCE ONLY. REFER TO STRUCTURAL
DRAWINGS FOR MORE DETAIL INFORMATION. ALL (E)
CONDITIONS TO BE FIELD VERIFIED.
TYP.
26-06
TYP.
26-07
FILLER
+/- 1 1/2"3' - 8"
3 EQUAL BASE CABINETS
10' - 6"3' - 8"
FILLER
+/- 1 1/2"
7'
-
2
"
OPEN TO
HALLWAY #06
09-07
TYP.
23-04
WB3
WD2 CASEWORK
SSM1 COUNTERTOP
2'
-
1
0
"
PT11
12
'
-
9
"
11
A5.07
1
A5.07
15
1' - 0"
1' - 0"
26-07
26-06
OPEN TO
HALLWAY #04
OPEN TO
ENTRY / CHECK
IN OFFICE #01
14 1213 11
23-05
TYP.
06-04 TYP.
06-06
TYP.
06-05
TYP.
06-08
09-07
WB3PT11TYP3' - 0"10-0410-05 10-05
EX1 EX1
TYP.
23-04
OF 4
9'
-
2
"
T
Y
P
.
02 01
09-07 PT11 TYP.
WB3
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS SHOWN AT (E) CONDITIONS ARE
TO FACE OF (E) FINISH. DIMENSIONS AT NEW WORK ARE TO FACE OF FRAMING, U.O.N.
DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY THE
CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. REFER TO DETAIL FOR TYPICAL MOUNTING HEIGHTS.
A. ALL BASE LEVEL WALL OUTLETS TO BE MOUNTED 15" MIN. FROM FINISH FLOOR, U.N.O.
ALL FINAL OUTLET LOCATIONS TO BE VIF W/ ARCHITECT.
B. ALL COUNTER LEVEL WALL OUTLETS TO BE MOUNTED 46" MAX. FROM FINISH FLOOR,
U.N.O. ALL FINAL OUTLET LOCATIONS IN DECORATIVE TILE BACKSPLASH TO BE VIF W/
ARCHITECT.
C. ALL LIGHT SWITCHES TO BE 6" O.C. FROM EDGE OF CASING OR WALL AND MOUNTED 48"
MAX. FROM FINISH FLOOR, U.N.O. ALL FINAL SWITCH LOCATIONS TO BE VIF W/
ARCHITECT.
6. COORDINATE LOCATION AND PROVIDE BLOCKING, BACKINGS AND/OR REINFORCEMENTS IN
PARTITIONS FOR ALL CABINETS, COUNTERTOPS AND ANY WALL MOUNTED ITEMS.
KEYNOTES
/17 A5.00
LEGEND
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
NEW CONCRETE SLAB ON GRADE INFILL, REFER TO STRUCTURAL DRAWINGS
NEW DEPRESSED CONCRETE SLAB ON GRADE FOR NEW TILE FLOOR FINISH;
SLOPE TO DRAIN 1/8" PER FOOT MIN.; REFER TO STRUCTURAL DWGS.
1i
xx
00
WALL TYPE TAG, REFER TO
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
FINISH MATERIAL TAG, REFER TO SHEET A6.10 FOR FINISH SPECIFICATIONSXX-0
5
A5.03
1-HOUR RATED WALL
-EXTERIOR WALLS ALONG GRIDS 1 AND 3 ARE TO BE 1-HOUR FIRE-
RESISTANCE RATED DUE TO FIRE SEPARATION DISTANCE
-EXTERIOR OPENINGS ARE TO BE PROTECTED BY AN EXTERIOR
FIRE SPRINKLER SYSTEM PER CHBC 8-402.1 (DEFERRED SUBMITTAL)
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
1
6
P
M
A4.03
INT. ELEVATIONS -
MULTI-PURPOSE
RM. A
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
A
B
C D
1 MULTI-PURPOSE ROOM A INTERIOR ELEVATIONS
1/2" = 1'-0"
06-04 (E) TRUSSES TO REMAIN, V.I.F., REFER TO STRUCTURAL DWGS.
06-05 CEILING JOISTS, REFER TO STRUCTURAL DWGS.
06-06 STRUCTURAL JOISTS, REFER TO STRUCTURAL DWGS.
06-07 (E) 1X6 SHEATHING EXPOSED
06-08 1X6 SHEATHING TO MATCH (E)
08-07 BLOCK OFF (E) ATTIC VENT
09-07 3" PICTURE MOLDING TO CAP OFF GYP BD AT OPEN CEILING
10-04 RECESSED FIRE EXTINGUISHER CABINET
10-05 EXIT SIGN, REFER TO T2.00 EGRESS/SIGNAGE PLAN
23-04 SUPPLY GRILLE, REFER TO MECHANICAL DWGS.
23-05 RETURN GRILLE, REFER TO MECHANICAL DWGS.
26-06 POWER OUTLET, REFER TO ELECTIRCAL DWGS.
26-07 DATA OUTLET, REFER TO ELECTRICL DWGS.
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
12PT11TYP.
WB4
9'
-
1
1
"
2' - 6"2' - 6"
26-06
FILLER
+/- 1/2"3' - 8"3' - 8"
FILLER
+/- 1/2"
8'
-
0
"
7'
-
2
"
9'
-
1
1
"
PT11 TYP.
WB4
1
A5.07
EQ EQ
26-06
FILLER
+/- 1"22' - 0"
FILLER
+/- 1"
2'
-
1
0
"
6 5 4 3
SSM1 COUNTERTOP
WD2 CASEWORK
PT TYP.
11
A5.07
EQEQ
EQEQ
EQ EQ 26-06
PT TYP.
WB4
7' - 0"
26-0626-07
14
9'
-
1
1
"
PT11 TYP.
WB4
EQEQEQEQ
6"
26-08 TYP.
26-06
PT11 TYP.
WB4
7' - 3"
111213
PT11 TYP.
WB4
EQ EQ EQEQ 1' - 0"
PT11 TYP.
WB4
EQ EQ 2' - 0"
26-06
26-07
GENERAL NOTES
1. REFER TO ADDITIONAL NOTES ON SHEET T0.01.
2. CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS.
NOTIFY THE ARCHITECT IMMEDIATELY OF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED
WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARE RESOLVED BY THE
ARCHITECT.
3. RESTORE ALL SURROUNDING AREAS AFFECTED BY THE WORK. PROTECT ALL EXISTING ITEMS
THAT ARE TO REMAIN.
4. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS SHOWN AT (E) CONDITIONS ARE
TO FACE OF (E) FINISH. DIMENSIONS AT NEW WORK ARE TO FACE OF FRAMING, U.O.N.
DIMENSIONS OF (E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY THE
CONTRACTOR IN THE FIELD. WHERE NO DIMENSION IS PROVIDED CONSULT WITH THE
ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.
5. REFER TO DETAIL FOR TYPICAL MOUNTING HEIGHTS.
A. ALL BASE LEVEL WALL OUTLETS TO BE MOUNTED 15" MIN. FROM FINISH FLOOR, U.N.O.
ALL FINAL OUTLET LOCATIONS TO BE VIF W/ ARCHITECT.
B. ALL COUNTER LEVEL WALL OUTLETS TO BE MOUNTED 46" MAX. FROM FINISH FLOOR,
U.N.O. ALL FINAL OUTLET LOCATIONS IN DECORATIVE TILE BACKSPLASH TO BE VIF W/
ARCHITECT.
C. ALL LIGHT SWITCHES TO BE 6" O.C. FROM EDGE OF CASING OR WALL AND MOUNTED 48"
MAX. FROM FINISH FLOOR, U.N.O. ALL FINAL SWITCH LOCATIONS TO BE VIF W/
ARCHITECT.
6. COORDINATE LOCATION AND PROVIDE BLOCKING, BACKINGS AND/OR REINFORCEMENTS IN
PARTITIONS FOR ALL CABINETS, COUNTERTOPS AND ANY WALL MOUNTED ITEMS.
KEYNOTES
/17 A5.00
LEGEND
EXISTING WOOD STUD WALL TO REMAIN
-NEW GYP BD SHEATHING ON INTERIOR SIDE(S) OF ALL (E) WALLS, TYP.
-ALL EXTERIOR WALLS TO RECEIVE R-19 BATT INSULATION
NEW CONCRETE SLAB ON GRADE INFILL, REFER TO STRUCTURAL DRAWINGS
NEW DEPRESSED CONCRETE SLAB ON GRADE FOR NEW TILE FLOOR FINISH;
SLOPE TO DRAIN 1/8" PER FOOT MIN.; REFER TO STRUCTURAL DWGS.
1i
xx
00
WALL TYPE TAG, REFER TO
WINDOW TAG, REFER TO SHEET A6.02 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
NEW SHEAR WALL SHEATHING, REFER TO STRUCTURAL DRAWINGS
FINISH MATERIAL TAG, REFER TO SHEET A6.10 FOR FINISH SPECIFICATIONSXX-0
5
A5.03
1-HOUR RATED WALL
-EXTERIOR WALLS ALONG GRIDS 1 AND 3 ARE TO BE 1-HOUR FIRE-
RESISTANCE RATED DUE TO FIRE SEPARATION DISTANCE
-EXTERIOR OPENINGS ARE TO BE PROTECTED BY AN EXTERIOR
FIRE SPRINKLER SYSTEM PER CHBC 8-402.1 (DEFERRED SUBMITTAL)
2x WOOD STUDS @ 16" O.C., MATCH ADJACENT WALL ASSEMBLY
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
1
9
P
M
A4.04
INT. ELEVATIONS -
TRAINING RM. B &
C
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
A B
C D
A B
C D
2 TRAINING ROOM B INTERIOR ELEVATIONS
1/2" = 1'-0"
1 TRAINING ROOM C INTERIOR ELEVATIONS
1/2" = 1'-0"
26-06 POWER OUTLET, REFER TO ELECTIRCAL DWGS.
26-07 DATA OUTLET, REFER TO ELECTRICL DWGS.
26-08 SWITCH, REFER TO ELECTRICAL DWGS.
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
16
A5.00
TILE BACKWARD PER FINISH
SCHED.
SPOUT MUST PROVIDE A FLOW
OF WATER AT 4" HIGH.
HI / LO DRINKING
FOUNTAINS WHERE IT
OCCURS
TILE BASE PER FINISH
SCHEDULE
NOTES:
1. IF "X" IS GREATER THAN 24"
THEN "Y" SHALL BE 18".
2. FORCE TO ACTIVATE
CONTROLS NOT TO EXCEED 5 lbs.
3 1/2
"
MAX.
18" MIN.48" MIN. CLR
48" MIN.CLRF.F.27
"
M
I
N
.
F.F.
36
"
M
A
X
.
38
"
-
4
3
"
16" MIN.
Y20
A5.00
EQ EQ
SEE PLAN FOR WIDTH
SE
E
R
E
F
L
E
C
T
E
D
C
E
I
L
I
N
G
P
L
A
N
48
"
M
A
X
.
T
O
A
L
L
O
P
E
R
A
B
L
E
P
A
R
T
S
36
"
-
4
3
"
T
O
B
U
B
B
L
E
R
36
"
M
A
X
.
T
O
B
U
B
B
L
E
R
27
"
M
I
N
.
C
L
E
A
R
16" MIN.
FIN. FLR
TILE BACK WALL, WHERE
OCCURS, FOR MORE
INFO, REFER TO INTERIOR
ELEVATIONS & FINISH SCHED.
OPTIONAL ACCESS PANEL, TOP &
BOT.
BOTTLE FILLER, WHERE OCCURS
PER PLANS
DUAL HEIGHT DRINKING
FOUNTAIN, FOR ATTACHMENT
SEE
TILE BASE, FOR MORE INFO REFER
TO INTERIOR ELEVATIONS &
FINISH SCHED.
℄
CEILING LINE
2X WOOD STUD FRAMING WALL,
SEE PLANS
WALL FINISH PER SCHEDULE
DRINKING FOUNTAIN & MOUNTING
PLATE BY MANUF.
3/8" DIA. MACHINE BOLT. TYP.
6X WOOD BLOCKING WITH
SIMPSON A34 AT TOP &
BOT. EA. END TYP.
1/4"X2" SQ. WASHER., TYP.
℄
27
"
M
I
N
TO
F
.
F
.
36
"
M
A
X
TO
B
U
B
B
L
E
R
38
"
-
4
3
"
M
A
X
TO
B
U
B
B
L
E
R
3 1/2" MAX.
1' - 3" MIN.
MAXIMUM
6"
67
OCCUPANCY
10"
1"
1"
1/
2
"
1"
1/
2
"
1"
1"
NOTE:
EVERY ROOM OR SPACE THAT IS AN ASSEMBLY OCCUPANCY SHALL HAVE THIS SIGN
POSTED IN A CONSPICUOUS PLACE NEAR THE MAIN EXIT OF EXIT ACCESS DOORWAY,
PER CBC 10004.3
1" HIGH LETTERS
PORCELAIN OR BAKED ON
ENAMEL ON STEEL OR 0,050
GA. T-3 ALUMN.
LETTERS TO BE WHITE ON
CONTRASTING COLOR
BACKGROUND, COLOR TBD
BY ARCHITECT
EQUAL
EQ
U
A
L
WHITE BORDER
BLUE BACKGROUND
THE COLOR BLUE SHALL
APPROXIMATE FS 15090 IN
FEDERAL STANDARD 595C
WHITE FIGURE
NOTE:
1. GRID LINES ARE SHOWN FOR PROPORTION ONLY AND ARE NOT TO APPEAR
AS PART OF THE SYMBOL.
2. REFER TO CBC 11B-703.7.2.1
48
"
M
A
X
MI
N
.
15
"
MAX.
10"
UNOBSTRUCTED SIDE REACH
46
"
M
A
X
TO 24" MAX
MORE THAN 10"
34
"
M
A
X
48
"
M
A
X
MAX
10"
34
"
M
A
X
OBSTRUCTED HIGH SIDE REACH OBSTRUCTED HIGH SIDE REACH
UNOBSTRUCTED FORWARD REACH OBSTRUCTED HIGH FORWARD REACH
MI
N
15
"
48
"
M
A
X
20" MAX
48
"
M
A
X
OBSTRUCTED HIGH FORWARD REACH
TO 25" MAX
GREATER THAN 20"
44
"
M
A
X
27
"
M
I
N
27
"
M
I
N
60
"
M
I
N
.
24" MIN. @ EXTERIOR
18" MIN @ INTERIOR
FRONT APPROACH, PULL SIDE
48
"
M
I
N
.
FRONT APPROACH, PUSH SIDE
60
"
M
I
N
.
36" MIN
HINGE APPROACH, PULL SIDE
44
"
M
I
N
.
*
HINGE APPROACH, PUSH SIDE
WITH BOTH CLOSER & LATCH
12" MIN. IF DOOR PROVIDED
MIN
22"
60
"
M
I
N
.
24" MIN
LATCH APPROACH, PULL SIDE
HINGE APPROACH, PUSH SIDE
MIN
24"
*48" IF DOOR
PROVIDED WITH
CLOSER & LATCH
44
"
M
I
N
*
*48" IF DOOR
PROVIDED WITH
CLOSER & LATCH
CLR, TYP
32" MIN
48
"
M
I
N
.
FRONT APPROACH SIDE APPROACH
42
"
M
I
N
.
42
"
M
I
N
.
POCKET OR HINGE APPROACH STOP OR LATCH APPROACH
42
"
M
I
N
.
MIN.
22"
MIN.
24"
10
"
80
"
M
I
N
IN GROUP B OCCUPANCIES, KEY-LOCKING
HARDWARE MAY BE USED IF SIGN STATING
"THIS DOOR TO REMAIN UNLOCKED WHEN
THIS SPACE IS OCCUPIED" IS PROVIDED AT
INTERIOR SIDE OF DOOR; LETTERS TO BE 1"
HIGH
CLOSER, WHERE PROVIDED
RATED DOOR - 5 LBS MAX PRESSURE
FIRE DOOR - 15 LBS MAX PRESSURE
NOTES:
1. EXIT DOORS SHALL BE OPERABLE FORM THE INSIDE WITHOUT THE USE OF A KEY OR ANY
SPECIAL KNOWLEDGE OR EFFORT.
2. SURFACE SLOPE OF THE LEVEL AREA TO HAVE A MAX SLOPE OF 1:48.
3. DOOR CLOSER, IF PROVIDED, MUST BE SET SO THAT IS TAKES A DOOR AT LEAST 5
SECONDS TO CLOSE FROM A 90 DEGREE POSITION TO A 12 DEGREE POSITION.
OPERABLE DOOR HARDWARE:
SINGLE EFFORT LEVER TYPE HARDWARE;
PANIC BAR; OR PUSH-PULL HARDWARE,
PER DOOR HARDWARE SPECIFICATIONS
SMOOTH UNINTERRUPTED SURFACE OR
SMOOTH PANEL ON PUSH SIDE OF DOOR
TO
B
O
T
T
O
M
34
"
M
I
N
TO
T
O
P
44
"
M
A
X
1/4" THK EQUILATERAL
TRIANGLE SYMBOL; 1/4"
MAX FROM EDGE OF
CIRCLE
1/4" THK CIRCLE
SYMBOL
GEOMETRIC DOOR SYMBOL:
UNISEX DOOR SYMBOL
12"
1/4" THK
TOILET ROOM TACTILE SIGN:
UNISEX TACTILE SIGN
NOTES:
1. ALL TEXT/GRAPHICS TO BE WHITE ON CONTRASTING BACKGROUND, TYP. BACKGROUND COLOR
TBD BY ARCHITECT, TYP.
2. THE COLOR OF THE DOOR SYMBOL SHALL CONTRAST WITH THE DOOR OR SURFACE ON WHICH
THE SYMBOL IS MOUNTED, EITHER LIGHT ON A DARK BACKGROUND OR DARK ON A LIGHT
BACKGROUND. FOR THE UNISEX SYMBOL, THE COLOR OF THE TRIANGLE SYMBOL SHALL
CONTRAST WITH THE COLOR OF THE CIRCLE SYMBOL, EITHER LIGHT ON A DARK BACKGROUND
OR DARK ON A LIGHT BACKGROUND. THE COLOR OF THE CIRCLE SYMBOL SHALL CONTRAST
WITH THE DOOR OR SURFACE ON WHICH THE SYMBOL IS MOUNTED, EITHER LIGHT ON A DARK
BACKGROUND OR DARK ON A LIGHT BACKGROUND.
3. WALL MOUNTED SIGNAGE TO BE LOCATED ON LATCH SIDE OF DOOR CLEAR OF DOOR SWING.
LETTERING SHALL BE UPPERCASE CHARACTERS WITH CORRESPONDING CALIFORNIA GRADE II
BRAILLE.
4. FOR SIGNAGE REQUIREMENTS REFER TO DETAIL 14
A5.00
RESTROOM
6"
6"
1/4" THK
EQUILATERAL
TRIANGLE SYMBOL
MALE DOOR SYMBOL
1/4" THK
PANEL
MALE TACTILE SIGN
MEN'S
FI
E
L
D
6"
M
I
N
PI
C
T
O
G
R
A
M
6"
1/4" THK CIRCLE
SYMBOL
WOMEN DOOR SYMBOL
12"
WOMEN TACTILE SIGN
WOMEN'S
6"
9"
1/32" RAISED
PICTOGRAM
5/8" TALL, 1/32"
RAISED TEXT
CALIFORNIA
GRADE II
BRAILLE
......
1/4" THK
PANEL
FI
E
L
D
6"
M
I
N
PI
C
T
O
G
R
A
M
9"
1/32" RAISED
PICTOGRAM
5/8" TALL, 1/32"
RAISED TEXT
CALIFORNIA
GRADE II
BRAILLE
......
1/32" RAISED
PICTOGRAM
5/8" TALL, 1/32"
RAISED TEXT
CALIFORNIA
GRADE II
BRAILLE
......
12"
EDGES AND VERTICES ON GEOMETRIC DOOR SYMBOLS (NTS):
RADIUS @ VERTICES EDGES -EASED/ROUNDED OR CHAMFERED
1/8" MIN -1/4" MAX
EASED EDGE,
1/16" MIN
CHAMFERED,
1/8" MAX
ISA
ISA
ISA
VE
R
T
I
C
A
L
1/
4
"
M
A
X
W/
B
E
V
E
L
E
D
S
L
O
P
E
1/
2
"
M
A
X
1/
4
"
M
A
X
1
2
DOOR PER SCHEDULE
METAL THRESHOLD SET IN BED
OF MASTIC; MECHANICALLY
FASTEN PER MANUFACTURER'S
RECOMMENDATIONS
1:2 MAX. SLOPE
FIRE EXTINGUISHER
CABINET
PA
R
T
O
F
O
P
E
R
A
T
I
N
G
H
A
N
D
L
E
/
C
O
N
T
R
O
L
S
48
"
M
A
X
.
T
O
H
I
G
H
E
S
T
FIRE ALARM PULL
STATION
THERMOSTAT LIGHT SWITCH
RECEPTACLE
18
"
15
"
M
I
N
NOTE: LIGHT SWITCHES AND
ELECTRICAL RECEPTACLES ON
CIRCUITS OF 30 AMP MAX ARE
15" MIN TO 48" MAX A.F.F.
MEASURED TO THE BOTTOM &
TOP OF THE SWITCH OR
OUTLET BOX
ALL COUNTER LEVEL WALL
OUTLETS REFER TO REACH
RANGE DETAIL 9/A5.00.
SOAP
DISPENSER
PAPER
TOWEL
DISPENSER
HAND
DRYER
NAPKIN
TAMPON
DISPENSER
COMBINED PAPER TOWEL
DISPENSER / WASTE
RECEPTACLE
PA
R
T
O
F
O
P
E
R
A
T
I
N
G
H
A
N
D
L
E
/
C
O
N
T
R
O
L
40
"
M
A
X
.
T
O
H
I
G
H
E
S
T
HOOK, TYP
HOOK,
ACCESSIBLE
60
"
48
"
TOILET ROOM ACCESSORIES MISCELLANEOUS
NOTE:
1. ALL HEIGHT DIMENSIONS ARE A.F.F.
2. CONTRACTOR TO PROVIDE MOUNTING HEIGHTS INDICATED, VERIFY INTENDED USE PRIOR TO ROUGH IN. PROVIDE BACKING AS REQUIRED.
3. THE PROJECTION FROM A SURFACE OR SEMI-RECESSED FIXTURE FROM THE FACE OF THE WALL OR PARTITION SHALL BE LIMITED TO 4"
OF
R
A
I
S
E
D
C
H
A
R
A
C
T
E
R
S
58
"
M
I
N
-
6
0
"
M
A
X
A
F
F
TO
C
E
N
T
E
R
L
I
N
E
O
F
H
I
G
H
E
S
T
L
I
N
E
EQ EQ
MIN
9"DOOR SIGNAGE,
WHERE OCCURS
WALL SIGNAGE
11
A5.00
NOTES:
1. SIGNS TO BE LOCATED ADJACENT TO LATCH SIDE OF DOOR. WHERE NO SPACE ON LATCH SIDE
IS AVAILABLE, SIGNS TO BE LOCATED AT NEAREST ADJACENT WALL.
2. SIGNS TO BE LOCATED ON APPROACH SIDE OF DOOR AS ONE ENTERS ROOM OR SPACE. SIGNS
THAT IDENTIFY EXISTS ARE TO BE LOCATED ON APPROACH SIDE OF DOOR AS ONE EXISTS
ROOM OR SPACE.
3. MOUNTING LOCATION SHALL BE DETERMINED SO THAT A PERSON MAY APPROACH WITHIN 3"
OF SIGNAGE WITHOUT OBSTRUCTION OR STANDING WITHIN THE SWING OF THE DOOR.
4. FOR SIGNAGE REQUIREMENTS AND MOUNTING HEIGHTS REFER TO DETAIL 14
A5.00
MO
U
N
T
I
N
G
H
E
I
G
H
T
,
R
E
F
E
R
T
O
14
A5
.
0
0
SIGN AT WALL
MIN
9"
WALL SIGNAGE
MO
U
N
T
I
N
G
H
E
I
G
H
T
,
R
E
F
E
R
T
O
14
A5
.
0
0
SIGN AT SIDELIGHT
MIN
9"
WALL SIGNAGE
MO
U
N
T
I
N
G
H
E
I
G
H
T
,
R
E
F
E
R
T
O
14
A5
.
0
0
SIGN AT WINDOW
+/-1" FROM CL
CHARACTER TYPE: CHARACTERS ON SIGNS SHALL BE RAISED 1/32" MINIMUM
AND SHALL BE SAN SERIF UPPERCASE CHARACTERS ACCOMPANIED BY
CONTRACTED GRADE II BRAILLE.
CHARACTER SIZE: RAISED CHARACTERS SHALL BE A MINIMUM OF 5/8" AND A
MAXIMUM OF 2" HIGH.
FINISH AND CONTRAST: CONTRAST BETWEEN CHARACTERS, SYMBOLS AND
THEIR BACKGROUNDS MUST BE 70% MINIMUM AND HAVE A NON-GLARE FINISH.
PROPORTIONS: VISUAL CHARACTERS ON SIGNS SHALL BE SELECTED FROM
FONTS WHERE THE WIDTH OF THE UPPERCASE LETTER "O" IS 60 PERCENT
MINIMUM AND 110 PERCENT MAXIMUM OF THE HEIGHT OF THE UPPERCASE
LETTER "I". STROKE THICKNESS OF THE UPPERCASE LETTER "I" SHALL BE 10
PERCENT MINIMUM AND 20 PERCENT MAXIMUM OF THE HEIGHT OF THE
CHARACTER.
BRAILLE: CONTRACTED (GRADE 2) CALIFORNIA BRAILLE SHALL BE USED
WHENEVER BRAILLE IS REQUIRED IN OTHER PORTIONS OF THESE STANDARDS.
DOTS SHALL BE 1/10" ON CENTER IN EACH CELL WITH 2/10" SPACE BETWEEN
CELLS MEASURED FROM THE SECOND COLUMN OF DOTS IN THE FIRST CELL TO
THE FIRST COLUMN OF DOTS IN THE SECOND CELL. DOTS SHALL BE RAISED A
MINIMUM OF 1/40" ABOVE THE BACKGROUND.
MOUNTING HEIGHT: SIGNS WITH RAISED CHARACTERS AND BRAILLE SHALL BE
LOCATED 48" MINIMUM ABOVE THE FINISH FLOOR, MEASURED FROM THE
BASELINE OF THE LOWEST LINE OF BRAILLE AND 60" MAXIMUM FROM THE
BASELINE BRAILLE OF THE HIGHEST LINE OF RAISED CHARACTERS.
EXIT
ROUTE
5/
8
"
-
2
"
3/
8
"
-
1
/
2
"
3/
8
"
M
I
N
EXIT
5/
8
"
-
2
"
3/
8
"
-
1
/
2
"
3/
8
"
M
I
N
60
"
M
A
X
A
F
F
T
O
B
A
S
E
L
I
N
E
O
F
HI
G
H
E
S
T
L
I
N
E
O
F
R
A
I
S
E
D
C
H
A
R
A
C
T
E
R
S
48
"
M
I
N
A
F
F
T
O
B
A
S
E
L
I
N
E
O
F
LO
W
E
S
T
L
I
N
E
O
F
B
R
A
I
L
L
E
CONTRACTED (GRADE 2)
CA BRAILLE RAISED .025"
MIN TO .037 MAX FROM
THE BACKGROUND
CHARACTERS SHALL BE RAISED 1/32" MIN FROM BACKGROUND,
UPPER CASE, SANS SERIF TYPE AND ACCOMPANIED WITH GRADE
2 BRAILLE. RAISED CHARACTERS SHALL BE AT LEAST 5/8" HIGH,
BUT NO HIGHER THAN 2". BRAILLE TO BE POSITIONED BELOW THE
RAISED CHARACTER TEXT WITH 3/8" MIN TO 1/2" MAX SPACE
FROM TEXT. BRAILLE SHALL BE CENTERED DIRECTLY UNDER THE
TACTILE LETTERING OR JUSTIFIED LEFT.
NOTES:
1. FOR SIGNAGE REQUIREMENTS, REFER TO DETAIL 14
A5.00
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
2
1
P
M
A5.00
ACCESSIBILITY
DETAILS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/2" = 1'-0"A5.00
12 ACCESSIBLE HI/LOW D.F. ALCOVE
1/2" = 1'-0"A5.00
16 ACCESS. HI/LOW D.F. ELEVATION
1 1/2" = 1'-0"A5.00
20 DRINKING FOUNTAIN ATTACHMENT
3" = 1'-0"A5.00
19 MAXIMUM OCCUPANCY SIGN
No. Description Date
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
ACCESSIBILITY UPDATES 12/13/2024
BACKCHECK SET_V2 4/8/2025
1" = 1'-0"A5.00
1 INTERNATIONAL SYMBOL OF ACCESSIBILITY (ISA)
3/8" = 1'-0"A5.00
9 REACH RANGES
1/4" = 1'-0"A5.00
2 DOOR APPROACHES & CLEARANCES
3/8" = 1'-0"A5.00
4 DOOR REQUIREMENTS
1 1/2" = 1'-0"A5.00
11 RESTROOM SIGNAGE
6" = 1'-0"A5.00
8 ACCESSIBLE THRESHOLD, TYPICAL
1/2" = 1'-0"A5.00
17 MOUNTING HEIGHTS
1/2" = 1'-0"A5.00
10 SIGNAGE @ DOOR
1" = 1'-0"A5.00
14 SIGNAGE REQUIREMENTS
3" = 1'-0"A5.00
15 TACTILE EXIT SIGN
1 1/2"
12
"
M
I
N
C
L
R
MI
N
C
L
R
1
1
/
2
"
PROTRUDING OBJECT ABOVE
1-1/4" TO 2" DIA STAINLESS STEEL GRAB BAR
MOUNTING FLANGE COVER
PLATE WITH VANDAL
RESISTANT SET SCREWS
BACKING PLATE
PROTRUDING OBJECT BELOW
33
"
-
36
"
T
O
T
O
P
O
F
G
R
I
P
P
I
N
G
S
U
R
F
A
C
E
2'
-
1
0
"
M
A
X
29
"
M
I
N
27
"
M
I
N
9"
M
I
N
8" - 10"3"
MIN
6"
25" MAX.
17" MIN
2'
-
1
0
"
OF
R
E
F
E
L
E
C
T
E
D
E
D
G
E
3'
-
4
"
T
O
B
O
T
T
O
M
18" MIN
INSUL TRAP &
HOT WATER LINE
MIRROR AS OCCURS
30" X 48" CLR FLR SPACE
30" MIN CLR.
ALL PIPES AND
VALVES SHALL
OCCUR WITHIN
SHADED AREA
ACCESSIBLE
LAVATORY TOE AND
KNEE CLEARANCE
SPACE
NOTE:
1. FAUCETS SHALL BE LEVER TYPE, ELECTRONICALLY OPERATED OR APPROVED SELF-CLOSING
W/ 10 SECONDS MIN. FLOW.
2. FAUCETS SHALL BE OPERABLE W/ ONE HAND & NOT REQUIRE TIGHT GRASPING, PINCHING OR
TWISTING OF THE WRIST.
3. FAUCET CONTROLS CAN NOT BE FURTHER BACK THAN THE TOE SPACE BELOW.
11" - 13"
NOTE:
1. THERE SHALL BE NO SHARP OR ABRASIVE OBJECTS OR SURFACES UNDER SINK.
2. FAUCETS SHALL BE LEVER TYPE, ELECTRONICALLY OPERATED OR APPROVED SELF-CLOSING
W/ 10 SECONDS MIN. FLOW.
3. FAUCETS SHALL BE OPERABLE W/ ONE HAND & NOT REQUIRE TIGHT GRASPING, PINCHING OR
TWISTING OF THE WRIST.
4. FAUCET CONTROLS CAN NOT BE FURTHER BACK THAN THE TOE SPACE BELOW.
34
"
M
A
X
9"
M
I
N
17" MIN - 19" MAX
29
"
M
I
N
27
"
M
I
N
8" - 10"
TOE CLR.
6" MAX.
KNEE CLR.
11" - 13"ACCESSIBLE LAVATORY TOE AND KNEE
CLEARANCE REQUIREMENTS; 30" MIN WIDTH
ALL WATER SUPPLY AND DRAIN
PIPES UNDER ACCESSIBLE
LAVATORIES SHALL BE INSULATED
OR OTHERWISE COVERED.
3"
48" DEEP LAVATORY
CLR FLR SPACE
24"
32
"
M
I
N
C
L
R
17
"
-
1
8
"
18
"
M
I
N
60" MIN CLR.
24" MIN
48" MIN
12" MAX
60
"
M
I
N
WALL MOUNTED
56" MIN
56"x60"
30"x48"
42" MIN
MAX
12"
24
"
M
I
N
MI
N
12
"
DOOR PERMITTED
TO SWING OVER
HATCHED AREA
CLEARANCE AROUND
WATER CLOSET
CLEARANCE AROUND SINK
FLUSH ACTIVATOR
ON WIDE SIDE
STAINLESS STEEL
GRAB BAR, REFER
TO 1
A5.01
MAX
12"42" MIN
TO
O
U
T
L
E
T
19
"
M
I
N
17" - 18"
LOCATE FLUSH
VALVE ON WIDE SIDE
MIN
12"24" MIN
36" MIN
GR
I
P
P
I
N
G
S
U
R
F
A
C
E
33
"
-
3
6
"
T
O
T
O
P
O
F
1 1/2"STAINLESS STEEL
GRAB BAR, REFER
TO
7" - 9"
24" MIN
OF
S
E
A
T
17
"
-
1
9
"
TO
T
O
P
OP
E
R
A
B
L
E
P
A
R
T
40
"
M
A
X
T
O
H
I
G
H
E
S
T
STAINLESS STEEL
GRAB BAR, REFER
TO
SURFACE
MOUNTED TOILET
SEAT DISPENSER
TOILET TISSUE
DISPENSER, MOUNTED
BELOW GRAB BAR
MI
N
.
1
1
/
2
"
MI
N
.
1
1
/
2
"
54" MIN
1
A5.01
1
A5.01
13 1/2" MIN.
17
"
M
A
X
.
30"x48" CLR. FLR. SPACE,
CENTERED ON FIXTURE;
REFER TO NOTE 1 BELOW
ABOUT ALCOVE DEPTH
TOE SPACE BELOW, 6" MAX
DEEP BY 9" MIN HIGH
NOTE:
1. iF URINAL IS IN AN ALCOVE DEEPER THAN 24", THEN THE CLEAR FLOOR SPACE IS TO BE
WIDENED FROM 30" TO 36".
2. FLUSH VALVE HAND CONTROLS TO BE OPERATED WITH ONE HAND, WITH 5 LBS MAX
OPERATING FORCE AND WITHOUT TIGHT GRASPING, PINCHING OR TWISTING OF THE WRIST.
3. HAND CONTROLS TO BE LOCATED 44" MAXIMUM ABOVE THE FLOOR.
60
"
M
I
N
59" MIN @ FLOOR MOUNTED W.C.
56" MIN @ WALL MOUNTED W.C.
60" MIN
60
"
M
I
N
59" MIN @ FLOOR MOUNTED W.C.
56" MIN @ WALL MOUNTED W.C.
60
"
M
I
N
59" MIN @ FLOOR MOUNTED W.C.
56" MIN @ WALL MOUNTED W.C.
60" MIN
60
"
M
I
N
59" MIN @ FLOOR MOUNTED W.C.
56" MIN @ WALL MOUNTED W.C.
48" MIN48" MIN
36" MIN.
DOOR PERMITTED
TO SWING OVER
HATCHED PORTION
OF MANEUVERING
CLEARANCE
DOOR PERMITTED
TO SWING OVER
HATCHED PORTION
OF MANEUVERING
CLEARANCE
A: OUT-SWINGING
SIDE OPENING
B: IN-SWINGING
SIDE OPENING
D: IN-SWINGING
END OPENING
C: OUT-SWINGING
END OPENING
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
2
2
P
M
A5.01
ACCESSIBILITY
DETAILS -
RESTROOMS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
No. Description Date
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
ACCESSIBILITY UPDATES 12/13/2024
BACKCHECK SET_V2 4/8/2025
3" = 1'-0"A5.01
1 GRAB BAR
1/2" = 1'-0"A5.01
4 ACCESSIBLE LAVATORY - WALL MOUNTED
1" = 1'-0"A5.01
5 ACCESSIBLE LAVATORY - UNDERMOUNT @ COUNTERTOP
1/2" = 1'-0"A5.01
3 SINGLE ACCOMODATION TOILET
1/2" = 1'-0"A5.01
2 ACCESSIBLE TOILET ACCESSORIES
1" = 1'-0"A5.01
7 ACCESSIBLE URINAL
1/4" = 1'-0"A5.01
6 TOILET COMPARTMENT CLEARANCES
8'
-
0
"
4"
3"
4" TYP
1"X1"X1/8" STEEL TUBE
PICKETS EQUALLY
SPACED, TOPS ARE
SPEAR-PRESSED.
START AND END PICKETS
4" MAX. FROM ADJACENT
POST TYP.
STEEL BOTTOM
RAIL, 1 1/2" x 1 1/2"
CONCRETE PAVING/ MOW
WHERE OCCURS
FOOTING,
REFER TO DETAIL
HSS 3"X3"X3/16" GALV.
POSTS @ 10'-0" O.C. WITH
GALVANIZED CAST IRON
CAPS,TYP.
STEEL DOUBLE TOP
RAILS, 1 1/2" x 1 1/2"
4
A5.02
FENCE POSTS,
SEE ELEVATION FOR SIZE,
SET W/ NON-SHRINK GROUT
CROWN TOP OF FOOTING TO
SLOPE AWAY FROM MOISTURE
FINISH GRADE
FINISH PAVING
CONCRETE FOOTING SIZE AND
REINFORCEMENT PER
MANUFACTURER'S REQUIREMENTS
2%
MAX2"2"
A: AT LANDSCAPE AREAS B: AT PAVING AREAS
40
"
℄
3"x3"x11 GA. STEEL
POST AND HEADER
6"x2"x3/16" HSS
PERIMETER FRAME,
TYP
16 GA. PERFORATED
METAL PANEL, 2'-0" MIN
EACH SIDE FOR SECURITY,
REFER TO SPECS.
FOR ADJACENT FENCE
SEE DETAIL CLOSER ON INSIDE,
COORDINATE CLOSER
MOUNTING W/ HEADER SIZE
12" x 2" HSS RAIL FOR EXIT
DEVICE HARDWARE
PANIC HARDWARE WITH VANDAL
PULL TRIM, WHERE OCCURS; REFER
TO GATE SCHEDULE
FINISH PAVING
FOOTING, REFER
TO DETAIL
NOTE:
1. GATE TO BE CUSTOM FABRICATED BY FENCING MANUFACTURER. CONTRACTOR TO SUBMIT
SHOP DRAWINGS OF GATES AND GATE HARDWARE PRIOR TO FABRICATION.
2. GATE TO BE OPERABLE WITH ONE HAND WITHOUT TIGHT GRASPING, PINCHING OR TWISTING OF
THE WRIST AND WITH 5 POUNDS MAX. OPERATING FORCE.
3. ALL OPERABLE GATE HARDWARE TO BE LOCATED BETWEEN 34" TO 44" ABOVE FINISH FLOOR.
10
"
2' MIN.
3
A5.02
4
A5.02
FACE OF BUILDING
4x4 WD POST WITHIN (E) STUD
WALL FULL HT. OR SISTERED TO
(E) STUDS, REFER TO STRUCT.
DWGS. FOR TYP. DETAILS
NOM. 1" GAP BETWEEN POST AND
FACE OF BLDG.
(3) L3x3x1/4 STL. ANGLES EVENLY
SPACED W/ 3/8" BOLT THROUGH HSS
& 3/8 LAG SCREW INTO WOOD POST
MIN. 2" EMBED.; COVER ACCESS
HOLES AFTER INSTALLATION TO
PREVENT WATER INGRESS
40
"
℄
3"x3"x3/16" STEEL
POSTs
FOR ADJACENT FENCE
SEE DETAIL
GATE LEVER AND LATCH;
REFER TO GATE SCHEDULE
FINISH PAVING
FOOTING, REFER
TO DETAIL
NOTE:
1. GATE TO BE CUSTOM FABRICATED BY FENCING MANUFACTURER. CONTRACTOR TO SUBMIT
SHOP DRAWINGS OF GATES AND GATE HARDWARE PRIOR TO FABRICATION.
2. GATE TO BE OPERABLE WITH ONE HAND WITHOUT TIGHT GRASPING, PINCHING OR TWSTING OF
THE WRIST AND WITH 5 POUNDS MAX. OPERATING FORCE.
3. ALL OPERABLE GATE HARDWARE TO BE LOCATED BETWEEN 34" TO 44" ABOVE FINISH FLOOR.
3
A5.02
4
A5.02
FACE OF BUILDING
10
"
8'
-
0
"
3"x3"x3/16" HSS PERIMETER
FRAME, TYP
4x4 WD POST WITHIN (E) STUD
WALL FULL HT. OR SISTERED TO
(E) STUDS, REFER TO STRUCT.
DWGS. FPR TYP. DETAILS
NOM. 1" GAP BETWEEN POST AND
FACE OF BLDG.
(3) L3x3x1/4 STL. ANGLES EVENLY
SPACED w/ 3/8" BOLT THROUGH HSS
& 3/8 LAG SCREW INTO WOOD POST
MIN. 2" EMBED.; COVER ACCESS
HOLES AFTER INSTALLATION TO
PREVENT WATER INGRESS
1'
-
0
"
4"
CONCRETE PAVING WITH #3
REINFORCING BARS @ 18" O.C.
BOTH HORIZONTAL DIRECTIONS;
PROVIDE BROOM FINISH RAN
PERPENDICULAR TO PATH OF
TRAVEL TYP,. UNO.
REFER TO LANDSCAPE
DRAWINGS FOR CONCRETE
COLOR
SUB BASE, COMPACTED TO 95%
RELATIVE COMPACTION AND
MOISTENED TO AT LEAST TWO
PERCENT ABOVE OPTIMUM
MOISTURE CONTENT, REFER TO
GEOTECH REPORT
UNDISTURBED EARTH
NOTE:
FOR MORE INFORMATION, REFER TO GEOTECH REPORT PREPARED BY GEOCON DATED
APRIL 23, 2024 AND CIVIL DWGS.
EQ
EQ
PE
R
G
E
O
T
E
C
H
R
E
P
O
R
T
4"
6"
CONCRETE PAVING WITH #4
REINFORCING BARS @ 16" O.C.
BOTH HORIZONTAL DIRECTIONS;
PROVIDE BROOM FINISH RAN
PERPENDICULAR TO PATH OF
TRAVEL TYP,. UNO.
REFER TO LANDSCAPE DRAWINGS
FOR CONCRETE COLOR
SUB BASE, COMPACTED TO 95%
RELATIVE COMPACTION, REFER
TO GEOTECH REPORT
UNDISTURBED EARTH
NOTE:
FOR MORE INFORMATION, REFER TO GEOTECH REPORT PREPARED BY GEOCON DATED
APRIL 23, 2024 AND CIVIL DWGS.
EQ
EQ
AGGREGATE BASE
FLUSH TRANSITION
1/4" RADIUS
(E) CONCRETE
PAVING W/
SAWCUT EDGE
CONCRETE PAVING
PER PLAN, REFER TO
1/2" MAX.
#4 x 12" LONG EPOXY
DOWELS @ 18" O.C.
SEALANT & EXPANSION
JOINT FILLER; 1/4" MAX
BELOW FINISH PAVING
REINFORCEMENT PER
PAVING TYPE, REFER TO
PAVING DETAILS
4"
8"
8"
1
A5.02
5
A5.02
1/2" RADIUS
CONCRETE PAVING
PER PLAN, REFER TO
REINFORCEMENT PER
PAVING TYPE, REFER TO
PAVING DETAILS
4"
8"
8"
1
A5.02
5
A5.02
1/
2
"
FINISH GRADE /
LANDSCAPING,
REFER TO CIVIL &
LANDSCAPE DWGS
CLR.
3"
CONCRETE PAVING PER
PLAN, REFER TO
REINFORCEMENT PER
PAVING TYPE, REFER TO
PAVING DETAILS
4"
8"
8"
1
A5.02
5
A5.02
FACE OF BUILDING
SEALANT & EXPANSION
JOINT FILLER
1/4" RADIUS
1/2"
CONCRETE PAVING
PER PLAN, REFER TO
SAWCUT JOINT PER PLAN,
SPACED AT INTERVALS NOT
GREATER THAN 10'
1
A5.02
5
A5.02
3/16"
SL
A
B
T
H
I
C
K
N
E
S
S
MI
N
I
M
U
M
O
F
1
/
4
T
H
E
NOTES:
1. SCORING PER PLAN, CONTRACTOR TO PROVIDE SHOP DRAWING FOR APPROVAL.
2. ADJUST SCORE LINES TO ALIGN WITH BUILDING AND SITE ELEMENTS AS MUCH AS
POSSIBLE WHILE MAINTAINING DESIGN INTENT.
3. WHERE SAWCUT MEETS VERTICAL SURFACE, SAWCUT SHALL TERMINATE NO MORE THAN
1/2" FROM EDGE.
4. SAWCUT WITHIN 8 HOURS OF CONCRETE FINISH.
CONCRETE PAVING
PER PLAN, REFER TO
SCORE JOINT, 3/8" RADIUS x
1" DEEP
1
A5.02
5
A5.02
PLACEMENT 1PLACEMENT 2
1'-0"1' -0"
NOTES:
1. INSTALL CONSTRUCTION JOINTS AS NECESSARY.
2. ALL CONSTRUCTION JOINTS SHALL ALIGN WITH SCORING SHOWN ON PLAN. CONTRACTOR
SHALL COORDINATE LOCATION OF CONSTRUCTION JOINTS AND SCORING PRIOR TO
POUR.
3. ALL OTHER NON CONSTRUCTION JOINT SCORING SHALL BE SAWCUT JOINT.
#4 SPEED DOWL AT 24" O.C.
1/4" RADIUS, TYP
CONCRETE PAVING PER
PLAN, REFER TO
REINFORCEMENT PER
PAVING TYPE, REFER TO
PAVING DETAILS
4"
8"
8"
1
A5.02
5
A5.02
FINISH GRADE,
REFER TO
CIVIL DWGS
6"1 1/2"
6"
RE
F
E
R
T
O
VA
R
I
E
S
CI
V
I
L
1/2"
1'
-
6
"
#4 REINFORCING
BAR
SEALANT & EXPANSION
JOINT FILLER
CONCRETE CURB
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
2
4
P
M
A5.02
SITE DETAILS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/4" = 1'-0"A5.02
3 METAL FENCE ELEVATION, TYPICAL
3/4" = 1'-0"A5.02
4 METAL POST FOOTING
1/4" = 1'-0"A5.02
7 PEDESTRIAN GATE ELEVATION - EGRESS
1/4" = 1'-0"A5.02
8 PEDESTRIAN GATE ELEVATION
3" = 1'-0"A5.02
1 CONCRETE PAVING
3" = 1'-0"A5.02
5 CONCRETE VEHICULAR PAVING
1 1/2" = 1'-0"A5.02
2 (N) CONCRETE TO (E) CONCRETE
1 1/2" = 1'-0"A5.02
6 CONCRETE EDGE
1 1/2" = 1'-0"A5.02
10 CONCRETE AT BUIDING
3" = 1'-0"A5.02
9 CONCRETE SAWCUT JOINT, TYP.
3" = 1'-0"A5.02
13 CONCRETE CONSTRUCTION JOINT, TYP
1 1/2" = 1'-0"A5.02
11 CONCRETE CURB
No. Description Date
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
NON-RATED INSTALLATION
RATED INSTALLATION
4"
M
A
X
4"
M
A
X
NON-RATED PARTITION PER PLAN
SCREW PER MANUFACTURER, TYP.
RECESSED TRIM
HANDLE
RATED PARTITION PER PLAN
CERTIFIED AND LISTED FIRE
RATED CABINET
SCREW PER MANUFACTURER, TYP.
RECESSED TRIM
HANDLE
ALIGN AND TAPE JOINT - TOP AND
SAND SMOOTH, BOTH SIDES
(E) WALL OR PARTITION - FIELD
VERIFY TYPE OF CONSTRUCTION
PARTITION PER PLAN
B1 - 2x6 WOOD STUDS @ 16" OC;
REFER TO STRUCTURAL DWGS.
B1b - (E) 2x WOOD STUDS
(1) LAYER OF 5/8" GYP BD BOTH
SIDES OF WALL
INTERIOR FINISH PER SCHED.
B1 -INTERIOR -NON-RATED PARTITION
PARTITION GENERAL NOTES:
1. DIMENSIONS ARE TO FACE OF FINISH, CENTERLINE OF STRUCTURAL COLUMNS, FACE OF FRAMING, UNLESS OTHERWISE NOTED.
2. FIRE-RESISTANCE RATING OF BUILDING ELEMENTS, COMPONENTS OR ASSEMBLIES SHALL BE DETERMINED BY THE TEST PROCEDURES SET FORTH IN UL
#U344
3. THE PARTITION TYPE ABOVE OR BELOW ANY OPENING IS TO BE THE SAME AS THAT SCHEDULED FOR EACH SIDE OF THE OPENING.
4. DIFFERING PARTITION TYPES SHALL ALIGN SO THAT WALL PLANES CONTINUE UNBROKEN IN ROOMS, UNLESS OTHERWISE NOTED.
5. USE CEMENT BOARD (OR APPROVED TILE BACKING BOARD) AT "WET" AREAS. USE MOISTURE-AND MOLD-RESISTANT TYPE X AT WALLS NOT SCHEDULED TO
RECEIVE TILE AT TOILET ROOMS AND OTHER AREAS PRONE TO HUMIDITY.
6. REFER TO INTERIOR ELEVATIONS, INTERIOR FINISH SCHEDULE AND INTERIOR DETAILS FOR FINISHES, WALL COVERINGS, PANELS AND TRIMS.
7. PROVIDE BACKING AS REQUIRED FOR ALL WALL MOUNTED ELEMENTS.
8. FOR TYPICAL PARTITION DETAILS REFER TO:
BASE DETAIL: RATED HEAD DETAIL: NON-RATED HEAD DETAIL:
(E) 2x6 WOOD STUDS @ 16" OC;
REFER TO STRUCTURAL
DRAWINGS FOR ANY REPAIR
A1 - (1) LAYER OF 5/8" GYP
A1r - (1) LAYER OF 5/8" TYPE "X"
GYP BD (1 HOUR RATED)
INTERIOR FINISH PER SCHED.
A1 -EXTERIOR -PLASTER TO GYP BD
(E) 1X6 SHEATHING; REFER TO
STRUCTURAL DRAWINGS FOR
ANY REPAIR
(E) PLASTER; PATCH AND REPAIR
PLASTER FINISH AS REQUIRED, ALL
NEW MATERIALS SHALL MATCH
ORIGINAL AS CLOSE AS POSSIBLE IN
FINISH AND TEXTURE
R-19 BATT INSULATION
(E) 2x6 WOOD STUDS @ 16" OC;
REFER TO STRUCTURAL DWGS.
FOR ANY REPAIR
(1) LAYER OF 5/8" GYP
A2r & A2br - (1) LAYER OF 5/8" TYPE "X"
GYP BD (1 HOUR RATED)
INTERIOR FINISH PER
SCHED.
A2 -EXTERIOR SHEAR WALL -PLASTER TO GYP BD
(E) 1X6 SHEATHING; REFER TO
STRUCTURAL DWGS. FOR ANY REPAIR
(E) PLASTER; PATCH AND REPAIR PLASTER
FINISH AS REQUIRED, ALL NEW MATERIALS
SHALL MATCH ORIGINAL AS CLOSE AS
POSSIBLE IN FINISH AND TEXTURE
R-19 BATT INSULATION
(E) 2x6 WOOD STUDS @ 16" OC;
REFER TO STRUCTURAL
DRAWINGS FOR ANY REPAIR
A3 -EXTERIOR -PLASTER TO TILE
(E) 1X6 SHEATHING; REFER TO
STRUCTURAL DRAWINGS FOR
ANY REPAIR
(E) PLASTER; PATCH AND REPAIR
PLASTER FINISH AS REQUIRED, ALL
NEW MATERIALS SHALL MATCH
ORIGINAL AS CLOSE AS POSSIBLE IN
FINISH AND TEXTURE
R-19 BATT INSULATION
A2 - PLYWOOD SHEAR WALL, REFER TO
STRUCT. DWGS.
A2b (NON-SHEAR WALL) - ADD SHEATHING
TO ALIGN WALL FINISHES WITH ADJACENT
SHEAR WALL
(E) 2x6 WOOD STUDS @ 16" OC;
REFER TO STRUCTURAL DWGS.
FOR ANY REPAIR
A4 -EXTERIOR SHEAR WALL -PLASTER TO TILE
(E) 1X6 SHEATHING; REFER TO
STRUCTURAL DWGS. FOR ANY REPAIR
(E) PLASTER; PATCH AND REPAIR PLASTER
FINISH AS REQUIRED, ALL NEW MATERIALS
SHALL MATCH ORIGINAL AS CLOSE AS
POSSIBLE IN FINISH AND TEXTURE
R-19 BATT INSULATION
A4 - PLYWOOD SHEAR WALL, REFER TO
STRUCT. DWGS.
A4b (NON-SHEAR WALL) - ADD SHEATHING
TO ALIGN WALL FINISHES WITH ADJACENT
SHEAR WALL
CERAMIC TILE
OVER BOND
COAT OVER
MORTAR BED;
TILE LOCATIONS
PER INT.
ELEVATIONS
CERAMIC TILE
OVER BOND
COAT OVER
MORTAR BED;
TILE LOCATIONS
PER INT.
ELEVATIONS
2x6 WOOD STUDS @ 16" OC;
REFER TO STRUCTURAL DWGS.
(1) LAYER OF 5/8" GYP BD
INTERIOR FINISH PER SCHED.
B3 -INTERIOR -NON-RATED PARTITION, TILE
2x6 WOOD STUDS @ 16" OC;
REFER TO STRUCTURAL DWGS.
(1) LAYER OF 5/8" GYP BD BOTH
SIDES OF WALL
INTERIOR FINISH PER SCHED.
B2 -INTERIOR -NON-RATED SHEAR WALL
B2 - PLYWOOD SHEAR WALL, REFER TO
STRUCT. DWGS.
B2b (NON-SHEAR WALL) - ADD SHEATHING
TO ALIGN WALL FINISHES WITH ADJACENT
SHEAR WALL
2x6 WOOD STUDS @ 16" OC;
REFER TO STRUCTURAL DWGS.
(1) LAYER OF 5/8" GYP BD BOTH
SIDES OF WALL
INTERIOR FINISH PER SCHED.
B4 -INTERIOR -NON-RATED SHEAR WALL, TILE
PLYWOOD SHEAR WALL, REFER TO
STRUCT. DWGS.
(1) LAYER OF 5/8"
TYPE "X" GYP BD/
CEMENT BOARD
CERAMIC TILE
OVER BOND
COAT OVER
MORTAR BED;
TILE LOCATIONS
PER INT.
ELEVATIONS
(1) LAYER OF 5/8"
TYPE "X" GYP BD/
CEMENT BOARD
CERAMIC TILE
OVER BOND
COAT OVER
MORTAR BED;
TILE LOCATIONS
PER INT.
ELEVATIONS
2x6 WOOD STUDS @ 16" OC;
REFER TO STRUCTURAL DWGS.
B5 -INTERIOR -NON-RATED PARTITION, TILE BOTH SIDES
(1) LAYER OF 5/8" TYPE "X"
GYP BD/ CEMENT BOARD,
BOTH SIDE OF WALL
CERAMIC TILE OVER BOND COAT
OVER MORTAR BED, BOTH SIDE
OF WALL; TILE LOCATIONS PER
INT. ELEVATIONS
2 ROWS OF 2x6 WOOD STUDS
@ 16" OC;
REFER TO STRUCTURAL
DWGS.
(1) LAYER OF 5/8" GYP BD
INTERIOR FINISH PER SCHED.
C1 -INTERIOR -CAVITY WALL, TILE
(1) LAYER OF 5/8"
TYPE "X" GYP BD/
CEMENT BOARD
CERAMIC TILE
OVER BOND
COAT OVER
MORTAR BED;
TILE LOCATIONS
PER INT.
ELEVATIONS
REFER TO PLAN
VARIES
2 ROWS OF 2x6 WOOD STUDS
@ 16" OC;
REFER TO STRUCTURAL
DWGS.
C2 -INTERIOR -CAVITY WALL, TILE BOTH SIDES
REFER TO PLAN
VARIES
(1) LAYER OF 5/8" TYPE "X"
GYP BD/ CEMENT BOARD,
BOTH SIDE OF WALL
CERAMIC TILE OVER BOND COAT
OVER MORTAR BED, BOTH SIDE
OF WALL; TILE LOCATIONS PER
INT. ELEVATIONS
2 ROWS OF 2x6 WOOD STUDS
@ 16" OC;
REFER TO STRUCTURAL
DWGS.
C3 -INTERIOR -SHEAR CAVITY WALL, TILE BOTH SIDES
REFER TO PLAN
VARIES
(1) LAYER OF 5/8" TYPE "X" GYP BD/
CEMENT BOARD, BOTH SIDE OF
WALL
CERAMIC TILE OVER BOND COAT
OVER MORTAR BED, BOTH SIDE
OF WALL; TILE LOCATIONS PER
INT. ELEVATIONS
C3 - PLYWOOD SHEAR WALL,
REFER TO STRUCT. DWGS.
C3b (NON-SHEAR WALL) - ADD
SHEATHING TO ALIGN WALL
FINISHES WITH ADJACENT SHEAR
WALL
A3 - (1) LAYER OF 5/8"
GYP/ CEMENT BD.
A3r - (1) LAYER OF
5/8" TYPE "X" GYP BD
(1 HOUR RATED)
A4 - (1) LAYER OF 5/8"
GYP/ CEMENT BD.
A4r - (1) LAYER OF
5/8" TYPE "X" GYP BD
(1 HOUR RATED)
9
A5.03
15
A5.03
10
A5.03
A: PERPENDICULAR TO FRAMING B: PARALLEL TO FRAMING
ROOF MEMBRANE ASSEMBLY
OVER PLYWOOD SHEATHING
(E) 1x6 SHEATHING
(E) ROOF TRUSS, VIF
WOOD BLOCKING
1x6 SHEATHING
(E) 2x6 WALL FRAMING, VIF;
PROVIDE FRAMING AS
REQUIRED FOR 1x6 SHEATHING
IF (E) FRAMING DOESN'T EXIST
PICTURE MOLDING
5/8" GYP BD
ROOF MEMBRANE
ASSEMBLY OVER
PLYWOOD SHEATHING
(E) 1x6 SHEATHING
(E) ROOF TRUSS, VIF
1x6 SHEATHING
PICTURE MOLDING
5/8" GYP BD 2x6 WALL FRAMING;
COORDINATION REQUIRED FOR
ATTACHMENT WITH NEW
STRUCTURAL ROOF AND CEILING
FRAMING, EXCAT LOCATION TO BE
REVIEWED IN THE FEILD,
ADDITIONAL FRAMING MAY BE
REQUIRED FOR 1x6 SHEATHING
PER PLAN
WALL TYPE
WALL FINISH PER SCHEDULE
WALL BASE PER SCHEDULE
FLOOR FINISH PER SCHEDULE
1/2" DIA. SIMP. TITEN HD SCREW
ANCHORS 3 1/4" MIN. EMBED @
4'-0" O.C. U.O.N.
1/2" MIN JOINT SEALANT PERIMETER
AND EACH SIDE OF WALL, AT FIRE
RATED WALLS USE UL CLASSIFIED
FIRESTOP, ALL OTHER WALLS USE
ACOUSTICAL SEALANT, TYP.
PARTITION PERPENDICULAR TO JOIST PARTITION PARALLEL TO JOIST
CEILING RAFTERS/JOIST,
REFER TO STRUCTURAL
DOUBLE TOP PLATES
PER PLAN
WALL TYPE
PER PLAN
WALL TYPE
2x BLOCKING, REFER TO
STRUCTURAL DWG.
GA
P
1/
2
"
DEFLECTOR SCREW, REFER TO
STRUCTURAL DETAIL 2/S0.23
DEFLECTOR SCREW, REFER TO
STRUCTURAL DETAIL 2/S0.23
CEILING RAFTERS/JOIST,
REFER TO STRUCTURAL
DOUBLE TOP PLATES
GA
P
1/
2
"
NOTES
1. RATED GYPSUM WALL BOARD ASSEMBLY
2. METAL STUDS
3. STEEL OR IRON PIPE, CONDUIT, OR EMT.
4. STEEL, IRON OR COPPER PIPE OR CONDUIT.
5. STTEL OR COPPER PIPE WITH UP TO 1" FIBERGLASS OR MINERAL
WOOL INSULATION.
6. PVC 2" CLOSED PIPE OR CONDUIT.
7. ELECTRICAL, TELEPHONE OR DATA CABLES. NOTE: ROMEX CABLE
IS APPROVED FOR USE IN THIS SYSTEM.
8. SPECSEAL SERIES 100 SEALANT INSTALLED TO A 1 1/4" DEPTH
AROUND PERIMETER OF OPENING.
9. MINERAL WOOL BATT NOMINAL 6 PCL. TO FULL WALL THICKNESS
RECESSED FROM BOTH SIDES TO ACCOMMODATE FILL MATERIAL.
FIRESTOP FOR MULTIPLE PIPE AND CABLES THROUGH GYP. BD.
WALLS USING SpecSeal SERIES 100 SEALANT.
PER UL# W-L-8003
1 15/16" MAX.
5/8" MIN.
1 4 5 6 7
8
3 8 2
9
3
4
5
6
7
1
A5.05
2
(E) TRUSS CHORD BEYOND, VIF
ROOF JOIST, PER STRUCTURAL DWGS
(E) TRUSS CHORD BEYOND, VIF
CEILING JOIST PER STRUCTURAL DWG
ROOF ASSEMBLY
(E) TOP PLATES
(E) PLASTER AND
WOOD SEATHING
1
A5.05
1/2" MIN JOINT SEALANT PERIMETER
AND EACH SIDE OF WALL, AT FIRE
RATED WALLS USE UL CLASSIFIED
FIRESTOP, ALL OTHER WALLS USE
ACOUSTICAL SEALANT, TYP.
1/2" MIN JOINT SEALANT @ PERIMETER
PENETRATIONS, AT FIRE RATED WALLS
USE UL CLASSIFIED FIRESTOP
5/8" GYP BD CEILING
5/8" TYPE "X"
GYP BD, TYP.
PER PLAN
WALL TYPE
R-19 BATT
INSULATION
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
2
5
P
M
A5.03
WALL TYPES &
DETAILS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1 1/2" = 1'-0"A5.03
20 PARTITION RECESS, TYPICAL
3" = 1'-0"A5.03
19 PARTITION TO (E) WALL
1 1/2" = 1'-0"A5.03
5 WALL TYPES
1 1/2" = 1'-0"A5.03
16 TOP OF WALL SHEATHING DETAIL @ MULTIPURPOSE RM A
3" = 1'-0"A5.03
9 WALL BASE
3" = 1'-0"A5.03
15 NON-RATED WALL HEAD
No. Description Date
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
1" = 1'-0"A5.03
17 RATED FIRESTOP
1" = 1'-0"A5.03
10 1-HOUR RATED WALL HEAD
2"x WD. STUDS PER PLAN
5/8" GYP. BOARD
PAINT PER FINISH SCHED.
CONT. BLOCKING
WALL
FINISH
PER
SCHED.
2"x WOOD CLNG.
JOIST @ 16" O.C.
CROSS TEES
AT 24" O.C.
MAIN RUNNERS
AT 48" O.C.
FIXTURES, SUPPORT
PER NOTES, TYP.
OPPOSITE FREE WALLS,
NO GRID ATTACHMENT,
3/4" MIN. CLEAR
12 GA.HANGER WIRES
AT 8" FROM ALL WALLS
AT ALL MAIN RUNNERS
AND CROSS TEES
12 GA. HANGER WIRES
AT 4'-0" O.C. EACH WAY
ALONG MAIN RUNNERS
STRUT AT FREE WALLS
4 EA. 12 GA. SPLAY
WIRES.
PERIMETER STARTER WALLS,
GRID ATTACHED TO (2) ADJACENT
WALLS
A
B
6
A5.04
6
A5.04
12
A5.04
10
A5.04
8
A5.04
12
"
M
I
N
CLR
3/4" MIN
1/4" LENGTH
OF END
RUNNER
WHICHEVER
IS LEAST
U.
N
.
O
WALL FINISH CONTINUES
WHERE OCCURS
12 GA. HANGER WIRES, TYP.
MIN. 3 TIGHT TURNS
MAIN "T" RUNNERS AT 48" O.C.
CROSS "T" AT 24" O.C.
ACOUSTICAL LAY-IN PANEL
POP RIVET PERIMETER ANGLE TO EA.
TEE RUNNER INTERSECTION @
RESTRAINED WALLS
WALL ANGLE ATTACHED TO WALL W/
#10 X 1-1/2"" WOOD SCREWS @ 16"
O.C. OR 6d X 1-1/2" L. NAILS ON 16 O.C.
2X BLOCKING PER STRUCT. DRAWINGS
RESTRAINED END
PERIMETER STARTER WALLA
C SECTION
"T" RUNNER
ACOUSTICAL LAY-IN
PANEL
'V" STRUTT
DRILL HOLE IN RUNNER & INSTALL 6d
RING SHANK NAIL
OR WITHIN
1/4" OF THE
LENGTH OF
END RUNNER
WHICHEVER
IS LESS
WALL FINISH CONTINUES WHERE
OCCURS
12 GA. HANGER WIRES, WITH TYP. MIN.
3 TIGHT TURNS IN 1-1/2"
T-RUNNERS
ACOUSTICAL LAY-IN PANEL
WALL ANGLE ATTACHED TO WALL W/
#10 X 1-1/2"" WOOD SCREWS @ 16"
O.C. OR 6d X 1-1/2" L. NAILS ON 16 O.C.
2X BLOCKING PER STRUCT. DRAWINGS
B FREE END
C
INTERLOCK 'V' STRUTS OR HORIZ.
16" GA. TIE WIRE @ WALLS
OPPOSITE POP RIVETED WALLS
NOTE:
1. WHERE THE PERPENDICULAR DISTANCE FROM THE WALL TO THE FIRST
PARALLEL MAIN RUNNER IS 8" OR LESS, THIS INTERLOCK IS NOT REQD.
2. NAILS @ THE END OF HORIZ. STRUTS ARE TO BE PLACED WITH NAIL HEAD
TOWARD CENTERLINE OF SPAN OF STRUT.
8" MAX
8" MAX.
U.
N
.
O
.
12
"
M
I
N
.
1/4" DIA. EYE-SCREW W/ 1-1/2"
PENETRATION
TYP. BRACING WIRE W/ 4
TIGHTS TURNS WITHIN 1-1/2"
3"
MA
X
FOR BRACING WIRES FULLY EMBED
EYE-SCREW SHANK IN DIRECTION OF
WIRE W/ 4 TIGHT TURNS WITHIN 1-1/2",
1-1/2" PENETRATION INTO JOISTS
3"
2"
MI
N
.
WOOD JOIST
OR RAFTER
BOTTOM OF
JOIST
A
B
MAIN RUNNER
ACOUSTICAL CEILING
#12 TEKS HEX HEAD
SELF DRILLING
FASTENERS AT 18" O.C.
STEEL STUD
COMPRESSION
STRUT,
SEE SCHEDULE
(2) #8 x 1-1/4" GALV.
WOOD SCREWSREMOVE
FLANGES AND
BEND WEB
HORIZONTAL
2X4 BLOCKING W/
(2) 16d NAILS AT
EACH END
ROOF FRAMING
STEEL STUD COMPRESSION
STRUT SCHEDULE
LENGTH
OF STRUT
UP T0 2'-6"
2'-7" TO 4'-6"
4'-7" TO 9'-6"
9'-7" TO 16'-6"
STRUT SIZE 18 GA, CEE
STUDS W/ 1 5/8" FLANGES
2 1/2" CEE CEE METAL
STUDS
2 1/2" CEE CEE
METAL STUDS
4" CEE CEE
METAL STUDS
4" CEE CEE
METAL STUDS
PROVIDE (4)
SIMPSON
A34. (2) ON EACH
SIDE OF EACH
END
NOTE:
1. COMPRESSION STRUT SHALL NOT
REPLACE HANGER WIRES
STEEL "CEE"
STUDS
#12 TEKS HEX
HEAD SELF
DRILLING
FASTENERS
AT 18" O.C.
12 GA. VERTICAL HANGER WIRE
@ 4'-0" EA. WAY (4'-0" O.C. @ MAIN
RUNNER) MIN 3 TIGHT TURNS IN
3" BOTH ENDS OF WIRE, TYP.
LATERAL FORCE BRACE
ASSEMBLY SHALL BE 8' X 12' O.C.
45° MAX TYP.
COMPRESSION STRUTS
STEEL SECTION WITH L/R RATIO OF 200 MAX.
ATTACH TO MAIN RUNNERS WITH 1/4" MACHIME-BOLT
AND TO STRUCTURE WITH 3/16" DIAMETER ANCHOR
AT CONCRETE / STEEL COMPRESSION STRUT SHALL
NOT REPLACE HANGER WIRE
(4)-12 GA. SPLAYED WIRES 90°
APART HORIZONTALLY WITH MIN.
4 TIGHT TURNS IN 1-1/2" BOTH
ENDS OF WIRE, TYP. WIRES
SHOULD BE TAUT WITHOUT
CAUSING THE CEILING TO LIFE
NO SPLICES PERMITTED
MAIN RUNNER
CROSS RUNNER
2" MAX FROM BRACING
WIRES TO CROSS RUNNERS
& COMPRESSION STRUTT
10
A5.04
NOTE:
FOR CONNECTIONS OF BRACING &
HANGER WIRES THE STRUCTURE
ABOVE, SEE DETAIL
11
A5.04
45.00°TYP
45° TYP
MIN. (4) 12 GA. VERTICAL HANGER
WIRES @ EA. LIGHT FIXTURE, AIR
TERMINAL SERVICES OR ITEMS
WEIGHING 56 lbs OR MORE ATTACH
TO STRUCTURE ABOVE, SEE DETAIL
4 WIRES-12 GA. BRACING FOR
FIXTURES, AIR TERMINALS, SERVICES
OR ITEMS WEIGHING LESS THAN 56 lbs
PER METAL SUSPENSION SYSTERMS
FOR LAY-IN PANEL CEILINGS NOTE #6
1 #8 S.M.S. (TOTAL OF 2 SCREWS)
IN OPPOSITE SIDES, LOCATE SCREWS
NEAR THE CENTER OF TERMINAL
OF FIXTURE
11
A5.04
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
2
7
P
M
A5.04
CEILING DETAILS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
6" = 1'-0"A5.04
1 GYPSUM BOARD CEILING
1. SUSPENSION LAY-IN CEILING SHALL BE CONTRACTOR DESIGN/BUILD.
2. PROVIDE HANGER WIRES ALONG MAIN RUNNERS. PROVIDE HANGER WIRES AT THE ENDS OF ALL
MAIN AND CROSS RUNNERS, AT THE PERIMETER OF THE CEILING AREA.
3. PROVIDE TRAPEZE OR OTHER SUPPLEMENTARY SUPPORT MEMBERS AT OBSTRUCTIONS TO
MAIN HANGER SPACING. PROVIDE ADDITIONAL HANGERS, STRUTS OR BRACES AS REQUIRED AT
ALL CEILING BREAKS, SOFFITS OR DISCONTINUOUS AREA. HANGER WIRES THAT ARE OUT OF
PLUMB ARE TO HAVE COUNTER-SLOPING WIRES.
4. CEILING GRID MEMBERS MAY BE ATTACHED TO ADJACENT WALLS. CEILING GRID MEMBERS
SHOULD BE AT LEAST 1/2" FREE OF OTHER WALLS. IF WALLS RUN DIAGONALLY TO CEILING GRID
SYSTEM RUNNERS, ONE END OF MAIN AND CROSS RUNNERS SHOULD BE FREE AND A MINIMUM
OF 1/2" CLEAR OF WALL.
5. AT THE PERIMETER OF THE CEILING AREA WHERE MAIN OR CROSS RUNNERS ARE NOT
CONNECTED TO THE ADJACENT WALL, PROVIDE INTERCONNECTIONS BETWEEN THE RUNNERS
AT THE FREE END TO PREVENT LATERAL SPREADING. A METAL STRUT OR A WIRE WITH A
POSITIVE MECHANICAL CONNECTION TO THE RUNNER MAY BE USED.
6. PROVIDE SETS OF SPLAYED BRACING WIRES ORIENTED 90 DEGREES FROM EACH OTHER.
PROVIDE BRACING WIRES AT LOCATIONS FROM EACH PERIMETER WALL AND AT THE EDGE OF
VERTICAL CEILING OFFSETS. THE SLOPE OF THESE WIRES SHOULD NOT EXCEED 45 DEGREES
FROM THE PLANE OF THE CEILING AND SHOULD BE TAUT WITHOUT CAUSING THE CEILING TO
LIFT. SPLICES IN BRACING WIRES ARE NOT TO BE PERMITTED WITHOUT APPROVAL.
7. FASTEN HANGER AND BRACING WIRES, HANGER OR BRACING WIRE ANCHORS TO THE
STRUCTURE SHOULD BE INSTALLED IN SUCH A MANNER THAT THE DIRECTION OF THE WIRE
ALIGNS AS CLOSELY AS POSSIBLE WITH THE DIRECTION OF THE FORCES ACTING ON THE WIRE.
8. SEPARATE ALL CEILING BRACING WIRES FROM ALL UNBRACED DUCTS, PIPES, CONDUIT, ETC. IT
IS ACCEPTABLE TO ATTACH LIGHTWEIGHT ITEMS, SUCH AS SINGLE ELECTRICAL CONDUIT.
9. WHEN DRILLED-IN CONCRETE ANCHORS ARE USED IN REINFORCED CONCRETE FOR HANGER
WIRES, 1 OUT OF 10 MUST BE FIELD TESTED BY TESTING LABORATORY FOR 200 POUNDS OF
TENSION. WHEN FILLED-IN CONCRETE ANCHORS ARE USED FOR BRACING WIRES, 1 OUT OF 2
MUST BE FIELD TESTED BY TESTING LABORATORY FOR 440 POUNDS IN TENSION. NO SHOT-IN
ANCHORS ARE PERMITTED.
10. ATTACHED ALL LIGHT FIXTURES TO THE CEILING GRID SYSTEM POSITIVELY. ATTACHMENT
DEVICE SHALL HAVE A CAPACITY OF 100 PERCENT OF THE LIGHTING FIXTURE WEIGHT ACTING IN
ANY DIRECTION.
11. FLUSH OR RECESSED LIGHT FIXTURES AND AIR TERMINALS OR SERVICES WEIGHING LESS THAN
56 POUNDS MAY BE SUPPORTED DIRECTLY ON THE RUNNERS OF A HEAVY DUTY GRID SYSTEM
BUT THEY MUST HAVE SAFETY WIRES ATTACHED TO THE FIXTURE AT DIAGONAL CORNERS AND
ANCHORED TO THE STRUCTURE ABOVE. ALL 4 FT. X 4 FT. RECESSED LIGHT FIXTURES AND AIR
TERMINALS OR SERVICES WEIGHING 56 POUNDS OR MORE MUST BE INDEPENDENTLY
SUPPORTED BY WIRES EACH ATTACHED TO THE FIXTURE AND THE THE STRUCTURE ABOVE
REGARDLESS OF THE TYPE OF CEILING GRID SYSTEM USED. THE WIRES INCLUDING THEIR
ATTACHMENT TO THE STRUCTURE ABOVE MUST BE CAPABLE OF SUPPORTING 4 TIMES THE
WEIGHT OF THE UNIT.
12. ALL FIXTURES AND AIR TERMINALS OR SERVICES SUPPORTED ON INTERMEDIATE DUTY GRID
SYSTEMS MUST BE INDEPENDENTLY SUPPORTED BY WIRES EACH ATTACHED TO THE FIXTURE
OR TERMINAL AND TO THE STRUCTURE ABOVE.
13. SUPPORT SURFACE MOUNTED LIGHT FIXTURES BY AT LEAST TWO POSITIVE DEVICES WHICH
SURROUND THE CEILING RUNNER AND WHICH ARE EACH SUPPORTED FROM THE STRUCTURE
ABOVE BY WIRE. SPRING CLIPS OR CLAMPS THAT CONNECT ONLY TO THE RUNNER ARE NOT
ACCEPTABLE. PROVIDE ADDITIONAL SUPPORTS WHEN LIGHT FIXTURES ARE LONGER.
14. SUPPORT PENDANT MOUNTED LIGHT FIXTURES DIRECTLY FROM THE STRUCTURE ABOVE WITH
HANGER WIRES OR CABLES PASSING THROUGH EACH PENDANT HANGER AND CAPABLE OF
SUPPORTING 4 TIMES THE WEIGHT OF THE FIXTURE. SPECIAL DETAILS ARE NECESSARY FOR
THIS CONDITION AT THE CEILING GRID.
15. THE WIDTH OF THE PERIMETER SUPPORTING CLOSURE SHALL NOT BE LESS THAN 2". IN EACH
ORTHOGONAL HORIZONTAL DIRECTION, ONE END OF THE CEILING GRID SHALL BE ATTACHED TO
THE CLOSURE ANGLE. THE OTHER END IN EACH HORIZONTAL DIRECTION SHALL HAVE A 0.75"
CLEARANCE FROM THE WALL AND SHALL REST UPON AND BE FREE TO SLIDE ON A CLOSURE
ANGLE.
16. FOR CEILING AREAS EXCEEDING 2,500 S.F., A SEISMIC SEPARATION JOINT OR FULL HEIGHT
PARTITION THAT BREAKS THE CEILING UP IN TO AREAS NOT EXCEEDING 2,500 S.F. SHALL BE
PROVIDED. EACH AREA SHALL BE PROVIDED WITH CLOSURE ANGLES.
17. EXCEPT WHERE RIGID BRACES ARE USED TO LIMIT LATERAL DEFLECTIONS, SPRINKLER HEADS
AND OTHER PENETRATIONS, A 2" OVERSIZE RING, SLEEVE, OR ADAPTER THROUGH THE CEILING
TILE SHALL BE USED TO ALLOW FOR FREE MOVEMENT OF AT LEAST 1" IN ALL HORIZONTAL
DIRECTIONS. ALTERNATIVELY, A SWING JOINT THAT CAN ACCOMMODATE 1" OF CEILING
MOVEMENT IN ALL HORIZONTAL DIRECTIONS IS PERMITTED TO BE PROVIDED AT THE TOP OF THE
SPRINKLER HEAD EXTENSION.
18. LATERAL BRACING FOR SUSPENDED CEILING SHALL BE PROVIDED. WHERE CEILING IS NOT
SUPPORTED BY INTERIOR PARTITIONS, CEILING BRACING SHALL BE PROVIDED BY FOUR NO. 12
GAUGE WIRES SECURED TO THE MAIN RUNNER WITHIN 2 INCHES ON THE CROSS RUNNER
INTERSECTION AND SPLAYED 90 DEGREES FROM EACH OTHER AT AN ANGLE NOT EXCEEDING 45
DEGREES FROM THE PLANE OF THE CEILING. A STRUT FASTENED TO THE MAIN RUNNER SHALL
BE EXTENDED TO AND FASTENED TO THE STRUCTURAL MEMBERS OF THE ROOF FLOOR ABOVE.
THESE HORIZONTAL RESTRAINT POINTS SHALL BE PLACE 12 FEET O.C. IN BOTH DIRECTIONS
WITH THE FIRST POINT WITHIN 6 FEET OF EACH WALL. ATTACHMENT OF RESTRAINT WIRES TO
THE STRUCTURE ABOVE SHALL BE ADEQUATE FOR THE LOAD IMPOSED.
SUSPENDED ACOUSTICAL CEILING NOTES
3/16" = 1'-0"A5.04
2 LAY-IN CEILING REQUIREMENTS
1 1/2" = 1'-0"A5.04
6 CEILING PERIMETER WALL ANGLES
3" = 1'-0"A5.04
11 WIRE TO WD. FRAMING CONN.
1 1/2" = 1'-0"A5.04
10 CEILING COMPRESSION STRUT
1/4" = 1'-0"A5.04
12 CEILING SPLAY BRACKING
1/4" = 1'-0"A5.04
8 FIXTURE SUPPORT
No. Description Date
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
TPO ROOF MEMBRANE SYSTEM
1/2" COVER BOARD
PLYWOOD SHEATHING, REFER
TO STRUCTURAL DWGS.
ROOF FRAMING, REFER TO
STRUCT. DWGS.
(E) ROOF FRAMING
TO REMAIN
1x6 SHEATHING,
PATCH AND REPAIR
AS REQUIRED
BATT INSULATION WHERE OCCURS,
REFER TO BUILDING SECTIONS
NOTE: REFER TO SPECIFICATIONS FOR ADDITIONAL INSTALLATION REQUIREMENTS
4"
M
I
N
4"
M
I
N
.
AS
R
E
Q
U
I
R
E
D
T
O
CO
V
E
R
(
E
)
F
R
A
M
I
N
G
1/2"
1/2"
(E) WALL FRAMING ROOF FRAMING, REFER
TO STRUCTURAL DWGS.
ROOF ASSEMBLY
SOLID CANT STRIP
CONT. METAL CLEAT
ROOF MEMBRANE
INSTALLED UP AND OVER
TOP OF PARAPET
22 GA. PRE-FIN. GSM
COPING SYSTEM
CONT. METAL CLEAT
(E) TOP PLATES
(E) PLASTER AND
WOOD SEATHING
1
A5.05
ROOF TILE
FELT
UNDERLAYMENT
SHEATHING
FASCIA
AIR SPACE BEHIND
GUTTER
METAL DRIP EDGE
LOCATE GUTTER
APPROX. 1/2" BELOW
SLOPE LINE
BIRDSTOP
EXTENSION OF
SLOPE
1/2" APPROX
1/
2
"
M
I
N
.
CODE APPROVED ADHESIVE
OVER MECHANICAL
ATTACHMENT
RIDGE TILE
WEATHER BLOCKING MORTAR
OR OTHER APPROVED
MATERIALS
WRAPPING OF NAILER
BOARD IS OPTIONAL EXCEPT
WITH THE USE OF MORTAR
SECURELY FASTEN RIDGE/HIP
NAILER OF SUFFICIENT
HEIGHT TO MAINTAIN AN EVEN
PLANE OF TRIM TILES
ROOF DECK
UNDERLAYMENT
FIELD TILE
OPENINGS AT HIPS, RIDGES AND HEAD WALLS INCLUDING CHIMINEYS, SKYLIGHTS,
SOLAR PANELS, AND DOWNSLOPE HORIZONTAL ABUTMENTS SHALL
BE FITTED WITH WEATHER BLOCKING MATERIAL TO KEEP WATER ON THE SURFACE OF
THE FIELD TILE. OTHER METHODS APPROVED BY LOCAL BUILDING
OFFICIAL WILL BE ALLOWED.
WRAPPING OF NAILER BOARD IS OPTIONAL EXCEPT WITH THE USE OF MORTAR. (ALL
PROFILES OF TILE)
NOTES:
1. FOR RECOMMENDED UNDERLAYMENT AND FASTENING REQUIREMENT, SEE
TABLE 1A AND 1B.
2. ALL HIP AND RIDGE TILE ARE REQUIRED TO HAVE A CODE APPROVED
ADHESIVE OR SPECIAL CLIP BETWEEN LAPS OF TRIM TILE TO COVER NAIL HOLE
AND CREATE A BOND BETWEEN RIDGE TILES.
3. BATTENS FOR TILES WITH PROTRUDING ANCHOR LUGS ARE OPTIONAL FOR
SLOPES BETWEEN 3:12 AND 7:12.
DIRECT DECK ATTACHMENT OF TILE AS APPROVED BY LOCAL BUILDING
OFFICIAL WILL BE ALLOWED.
4. DIMENSION SHOWN ARE MINIMUM AND ARE INTENDED TO BE APPROXIMATE TO
ALLOW FOR REASONABLE TOLERANCE DUE TO FIELD CONDITIONS
AND ARE PRACTICES.
1
A5.05
PLYWOOD
SHEATHING, TYP.
WOOD STUDS
WALL
SOLID CANT STRIP
OR BRACE AS PER
STRUCTURAL
ROOF STRUCTURE
PER STR. DWG., TYP.
ROOF DRAIN
ROOFING SYSTEM
EXTEND UP TO PARAPET
UNDERLAYMENT
12 GA. METAL PAN
#4 LEAD SHEET FLASHING
SET IN MASTIC OVER
PRIMED SUBSTRATE, TYP.
ROOFING SYSTEM
1/2" SEPARATION
BOARD
PLYWOOD
SHEATHING, TYP.
MAIN DRAIN
1' - 6"
MULTIPLE LAYERS OF
ENERGY GUARD®ROOF
INSULATION, STAGGERED
AND OFFSETROOF DECK/SUBSTRATE
DRILL-TEC PLATES®&
FASTENERS 12" (305 mm)
O.C. OR 6" (152 mm) O.C.
FOR BALLASTED SYSTEMS
REINFORCED EVERGUARD®MEMBRANE FOR TPO ONLY
FOR PVC MEMBRANE, SUBSTITUTE WITH FLAT STOCK
METAL, FASTENED APPROPRIATELY
EVERGUARD®WATER BLOCK
APPROVED FASTENERS
CONTINUE UNDERLAYMENT OVER
EVERGUARD® MEMBRANE OR METAL
SHINGLES, TILE, OR METAL
PANELS BY OTHERS
OVERLAP
18" (457 mm) MIN.
NOTE:
1. MINIMUM SLOPE IS 2:12.
2. FOR INSULATION THICKNESS GREATER THAN 8" (203 mm), A COVER BOARD
IS REQUIRED ON MECHANICALLY ATTACHED
SYSTEMS ONLY.
3. ADD BALLAST PER SPECIFICATION FOR BALLASTED SYSTEMS.
NOMINAL
2" X 3" OR 2" X 4" NAILER
NOMINAL
2" X 2" NAILER
UNDERLAYMENT
BIRDSTOP
PAN TILE
BOOSTER TILE
STARTER COVER TILE
TWO CORROSION-RESISTANT NAILS, PER RAKE TILE, OF
SUFFICIENT LENGTH TO PENETRATE THE NAILER OR
BARGE BOARD A MINIMUM OF 3/4"
NAILER BOARD
OPTIONAL NAIL
EXTEND FELT OVER EDGE
MINIMUM OF 1"
OPTIONAL NAIL BOARD
BIRDSTOP
STUCCO OR OTHER
CLADDING
NOTES:
1. DIMENSIONS SHOWN ARE MINIMUMS AND ARE INTENDED
TO BE APPROXIMATE TO ALLOW FOR REASONABLE
TOLERANCES DUE TO FIELD CONDITIONS, AND AREA
PRACTICE.
2. SEE TABLE 1A FOR ADDITIONAL FASTENING REQUIREMENTS.
1
A5.05
VENT PIPE PER MECH.
SEALANT
STAINLESS STEEL
HOSE CLAMP
ROOFING SYSTEM
FLASHING MEMBRANE
HOT-AIR WELD
ROOFING SYSTEM BASE
FLASHING, HOT-AIR WELD
ROOF ASSEMBLY
1/
2
"
2"
4"8"
M
I
N
.
CONT. SEALANT &
BACKER ROD
ROOF ASSEMBLY
1
A5.05
DRILL-TEC™PLATES & FASTENERS 12" (305 mm) O.C.
(6" [152 mm] O.C. FOR BALLASTED SYSTEMS)
PREMANUFACTURED OR UNREINFORCED FIELD
FABRICATED CORNERS
- HEAT WELDED
REINFORCED EVERGUARD®
MEMBRANE
ROOF ASSEMBLY
DRILL-TEC™ PLATES &
FASTENERS 12" (305
mm) O.C. (6" [152 mm]
O.C. FOR BALLASTED
SYSTEMS)
DRILL-TEC™
FASTENERS 12"
(305 mm) O.C.
(MIN. 1 PER
PLANE)
EVERGUARD®
COATED METAL
WITH HEMMED
EDGE
2"
AB
O
V
E
R
O
O
F
F
I
N
I
S
H
8"
M
I
N
.
FLASHING BENT
INSIDE VENT
COLUMN PER
STRUCTURAL
FLASHING
FLASHING HOT AIR
WELDED TO ROOFING
MEMBRANE
CONT. SEALANT &
BACKER ROD
ROOF MEMBRANE
ROOF ASSEMBLY
CONT. SEALANT &
BACKER ROD
REFER TO SMACNA
FIG 4-15C FOR MORE
INFORMATION
1/
2
"
10
A5.05
9
A5.05
3'-0" x 2'-6" ROOF
ACCESS HATCH
SAFETY POST
ROOF SHEATHING
ROOF OPENING FRAMING
(PER ROOF FRAMING PLAN)
FIRE BLOCKING
(2) LAYERS 5/8" TYPE
'X' TO UNDERSIDE OF CLNG.
FRAMING @ 1-HR. RATED
CLNG. CONDITION
ANCHORAGE OCCURS @ TOP,
BOTTOM & 4'-0" O.C. VERT.
BETWEEN
9" X 3" X 3/8" STL. PLATE
BOLT TO BLOCKING W/
3/8" LAG BOLTS
1/2/" X 2" STL. BAR
STRINGERS @ 20" O.C.
3/4" DIA. STL. BAR
RUNGS @ 12" O.C., TYP.
FIN. FLR.
CONC. CURB
(2) BEND STRINGER 3" W/ (1) HILTI 1/2" DIA.
HILTI KWIK BOLT "TZ" CONC. ANCHOR EACH
STRINGER. ICC-ESR-1917
42
"
.
6"
.
12
"
.
X 2'-6" WIDE
3' - 0" NOMINAL
(1) LAYER 5/8"
TYPE 'X' GWB EA.
SIDE @ 1-HR FIRE
RATED SHAFT
CONDITIONS
8"
1'
-
3
"
12
"
M
A
X
.
6"
M
I
N
.
TY
P
.
1'
-
0
"
26" SWEAT/BLEEDER SHEET
ROOF DECK
ROOF DECK
VALLEY FLASHING
OPTIONAL: SELF-ADHERING POLYMER
MODIFIED ASPHALT MEMBRANE ON EACH SIDE
TO COVER FLASHING FLANGE
CUT TOP CORNER OF UNDERLAYMENT TO
INSURE PROPER DIVERSION OF WATER INTO
THE VALLEY METAL
ROOF UNDERLAYMENT
VALLEY FLASHING
(EXTEND ENTIRE WIDTH OF VALLEY METAL
BEYOND EDGE)
1/4"
TYP.
3/16"
3/4" DIA STEEL BAR
SKID RESISTANT
TEXTURED RUNGS @
12" O.C. MAX. TYP.
1/2" X 2" STEEL
STRINGERS
@ 20" O.C.
1/4" X 2 1/2" X 9" X 3" BENT
STEEL PLATE TAB
@ 5'-0" O.C. MAX. WELDED
TO STRINGER
BEND STRINGER 3"
W/ (1) HILTI 1/2" DIA.
HILTI KWIK BOLT "TZ"
CONC. ANCHOR EACH
STRINGER. ICC-EST-1917
WOOD STUDS WALL
ASSEMBLY
NUT W/ LOCK
WASHER
STRUCTURAL BACKING
1/2" DIA. GALV.
MACHINE BOLTS EA.
TAB
2 1/2" DIA. X 1/2"
THK. STEEL
SPACER
WALL FINISH
PER SCHED.
NOTE: NO SHARP EDGES
OR ABRASIVE SURFACES
ON OR AROUND THE
LADDER. EASE ALL EDGES
AND GRIND ALL WELDS SMOOTH
3/16"
CONC. SLAB
12
"
O
.
C
.
M
A
X
.
E
Q
.
S
P
A
C
I
N
G
T
Y
P
.
6"
M
A
X
.
ROOF FRAMING
PER STR. DWG.
PLYWOOD SHEATHING
PER STR. DWG.
MEMBRANE ROOFING
TEST, CLEAN, PRIME SUBSTRATE
1/2" THK. SEPARATION BOARD
SPECIFIED ROOFING FASTENERS INTO BENT PLATE
MEMBRANE ROOFING FLASHING
TEST, CLEAN, PRIME SUBSTRATE
22 GA. SS SM SKIRT HEMMED SET ON SEALANT
TERMINATION BAR SET IN SEALANT
W/ CONT. SEALANT AT TOP
GSM COUNTER FLASHING BY ROOF HATCH MFGR.
ROOF HATCH
8"
M
I
N
.
N
T
S
2"
4"
.
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
2
9
P
M
A5.05
ROOFING DETAILS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
3" = 1'-0"A5.05
1 TPO MEMBRANE ROOFING ASSEMBLY
3" = 1'-0"A5.05
2 PARAPET
1 1/2" = 1'-0"A5.05
18 ROOF EAVE & GUTTER
1 1/2" = 1'-0"A5.05
13 CLAY TILE ROOFING ASSEMBLY AND RIDGE
3" = 1'-0"A5.05
8 ROOF DRAIN
1 1/2" = 1'-0"A5.05
14 ROOF TRANSITION
1 1/2" = 1'-0"A5.05
17 GABLE EAVE DETAIL
3" = 1'-0"A5.05
3 VENT PIPE PENETRATION
1 1/2" = 1'-0"A5.05
12 THRU WALL OVERFLOW SCUPPER
3" = 1'-0"A5.05
7 PIPE PENETRATION
3/4" = 1'-0"A5.05
5 ROOF HATCH
1 1/2" = 1'-0"A5.05
19 CLAY TILE ROOF VALLEY
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
3" = 1'-0"A5.05
9 LADDER ANCHOR
3" = 1'-0"A5.05
10 ROOF HATCH CURB FLASHING
NOT TO SCALE
No. Description Date
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
1 1/8"
9
1
/
4
"
9
1
/
8
"
ORIGINAL BARN DOOR PROFILES;
NEW DOORS TO MATCH
9
1
/
8
"
NEW WATERPROOFING
MEMBRANE AT
NEW/REPLACEMENT
WINDOWS, EXTEND 6"-8"
FROM ROUGH OPENING
TO TIE INTO EXISTING
WATERPROOFING;
PATCH (E) EXTERIOR
PLASTER FINISH AS
REQUIRED
WOOD WINDOW; REPAIR (E)
WOOD WINDOW OR NEW WOOD
WINDOW TO MATCH ORIGINAL,
REFER TO WINDOW SCHEDULE
WOOD CASING TO
MATCH ORIGINAL
NEW WATERPROOFING
MEMBRANE AT
NEW/REPLACEMENT
WINDOWS, EXTEND 6"-8"
FROM ROUGH OPENING
TO TIE INTO EXISTING
WATERPROOFING;
PATCH (E) EXTERIOR
PLASTER FINISH AS
REQUIRED
(E) PLASTER DETAIL;
REPAIR OR REPLACE AS
REQUIRED TO COMPLETE
WINDOW SCOPE
WOOD WINDOW; REPAIR (E)
WOOD WINDOW OR NEW WOOD
WINDOW TO MATCH ORIGINAL,
REFER TO WINDOW SCHEDULE
WOOD CASING TO
MATCH ORIGINAL
WOOD WINDOW
PER SCHEDULE
3
A5.06
2
A5.06
NEW WATERPROOFING
MEMBRANE, EXTEND 6"-8"
FROM ROUGH OPENING TO
TIE INTO EXISTING BUILDING
WATERPROOFING;
PATCH (E) EXTERIOR
PLASTER FINISH AS
REQUIRED
REFER TO WALL TYPES
CERAMIC TILE WALL FINISH
WHERE INDICATED, INSTALL
SEALANT AT DOOR FRAME
PERIMETER
1 1/4"
3
1
/
4
"
1/
4
"
3
1
/
4
"
1 1/4"
WOOD TRIM, TYP BOTH SIDES
DOOR PER SCHEDULE
WOOD FRAME
SHIM, AS REQUIRED
WOOD DOOR STOP, 5/8" x 1-1/2"
REFER TO WALL TYPES
1/
4
"
5/
8
"
6"
1
1
/
4
"
WOOD TRIM, TYP BOTH SIDES
DOOR PER SCHEDULE
WOOD FRAME
SHIM, AS REQUIRED
1 1/4"
1/2"
1/4"
WOOD DOOR STOP, 5/8" x 1-1/2"
A: SAME FINISH
DOOR WHERE
OCCURS
SAME FINISH
C: INTERIOR CONCRETE / EXTERIOR PAVING
DOOR WHERE
OCCURS
(E) WALL FACE
SITE PAVING, SLOPED PER CIVIL
DWGS.; 2% MAX
INT. CONCRETE
WD DOOR FRAME
1/
4
"
ALUMN. THRESHOLD, SAME WIDTH
AS DOOR FRAME, SET IN FULL BED
OF MASTIC. MECHANICALLY
FASTEN INTO CONCRETE SLAB PER
MAN. RECOMMENDATIONS
NOTE: REFER TO FOR ACCESSIBLE THRESHOLD INFORMATION.
B: INTERIOR CONCRETE / TILE
DOOR WHERE
OCCURS
METAL T-MOLDING WELDED
PROFILE TRANSITION STRIP.
INSET INTO EPOXY-FILLED
GROOVE PER MANUFACTURER'S
INSTRUCTIONS
TILE FLOOR, PER FINISH
SCHEDULEINT. CONCRETE
D: (E) CONCRETE CURB THRESHOLD
DOOR WHERE
OCCURS
(E) WALL FACE
SITE PAVING, SLOPED PER CIVIL
DWGS, 2% MAX
INT. CONCRETE
WD DOOR FRAME
FLUSH TRANSITION BETWEEN
BUILDING SLAB AND NEW
CONCRETE PAVING; WHERE
FLUSH TRANSITION CAN NOT
BE PROVIDED 1/4" MAX OFFSET
ALLOWED PER CODE
SEALANT AND
EXPANSION MATERIAL
8
A5.00
-FLOOR DEPRESSION
PER PLAN
MA
X
1/
4
"
BE
V
E
L
E
D
S
L
O
P
E
1/
2
"
M
A
X
W
/
1:2 MAX. SLOPE
(E) CONCRETE THRESHOLD,
REPAIR CONCRETE AS
REQUIRED; TO BE FURTHER
REVIEWED IN THE FIELD FOR
ACCESSIBILITY COMPLIANCE
1/2" MAX
FLUSH TRANSITION BETWEEN
BUILDING SLAB AND NEW
CONCRETE PAVING; WHERE
FLUSH TRANSITION CAN NOT
BE PROVIDED 1/4" MAX OFFSET
ALLOWED PER CODE
SEALANT AND
EXPANSION MATERIAL
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
2
:
3
0
P
M
A5.06
DOOR & WINDOW
DETAILS
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
3" = 1'-0"A5.06
17 BARN DOOR PROFILES
6" = 1'-0"A5.06
3 WINDOW HEAD, TYPICAL (JAMB SIMILAR)
6" = 1'-0"A5.06
2 WINDOW SILL, TYPICAL
3/4" = 1'-0"A5.06
1 TYPICAL WINDOW WATERPROOFING TIE IN
3" = 1'-0"A5.06
9 INTERIOR WOOD DOOR JAMB, TYPICAL
3" = 1'-0"A5.06
10 INTERIOR WOOD DOOR HEAD, TYPICAL
No. Description Date
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
ACCESSIBILITY UPDATES 12/13/2024
BACKCHECK SET_V2 4/8/2025
3" = 1'-0"A5.06
13 THRESHOLDS
SOLID WOOD INSET
SHAKER CABINET
DOOR PER INT. ELE.
SOFT CLOSE INSET
HINGES, TYP.
SOLID WOOD FACE
FRAME
NOTES:
1. CABINET FINISH PER FINISH SCHEDULE
2. CONTRACTOR TO PROVIDE SAMPLES AND SHOP DRAWINGS
3. ALL FASTENERS AND ADHESIVE TO BE USED AS NEEDED AND CONCEALED
7'
-
9
"
3/
4
"
5
1
/
2
"
1/
8
"
2'
-
2
"
1/
8
"
6'
-
6
1
/
4
"
1
1
/
2
"
1/
8
"
3'
-
7
"
1
3
/
4
"
1/
8
"
SOLID WOOD INSET
SHAKER CABINET
DOOR PER INT. ELE.
SOFT CLOSE INSET
HINGES, TYP.
SOFT CLOSE INSET
HINGES, TYP.
SOFT CLOSE INSET
HINGES, TYP.
SOLID WOOD FACE
FRAME
SOLID WOOD FACE
FRAME
3/
4
"
1' - 6"
ADJUSTABLE
SHELF
NOTE: ADJUSTABLE
SHELFS - PEGS,
THREE PER SHELF
ADJUSTABLE
SHELF
FIXED SHELF
FIXED SHELF
2'
-
1
0
"
1
1
/
2
"
1/
8
"
6"
1/
8
"
1
1
/
2
"
1/
8
"
1'
-
7
"
1/
8
"
1
1
/
2
"
4"
3/4"
4"
2' - 0"
COUNTERTOP PER
FINISH SCHEDULE;
EASED EDGE PROFILE
SOLID WOOD FACE
FRAME
SOLID WOOD INSET
FLUSH FACE CABINET
DRAWER; SOFT
CLOSING DRAWER
SLIDES
NOTES:
1. CABINET FINISH PER FINISH SCHEDULE.
2. CONTRACTOR TO PROVIDE SAMPLES AND SHOP DRAWINGS
3. ALL FASTENERS AND ADHESIVE TO BE USED AS NEEDED AND CONCEALED.
SOLID WOOD INSET
SHAKER CABINET
DOOR; SOFT CLOSE
INSET HINGES, TYP.
1" ADJUSTABLE SOLID
WOOD SHELF
1/4" ADJUSTABLE METAL
PEGS FOR SHELVING
1
1
/
2
"
1/
8
"
SOLID WOOD INSET
SHAKER CABINET
DOOR PER INT. ELE.
(2) 1" ADJUSTABLE
SOLID WOOD SHELF
SOFT CLOSE INSET
HINGES, TYP.
SOLID WOOD FACE
FRAME
NOTES:
1. CABINET FINISH PER FINISH
SCHEDULE.
2. CONTRACTOR TO PROVIDE
SAMPLES AND SHOP DRAWINGS
3. ALL FASTENERS AND ADHESIVE
TO BE USED AS NEEDED AND
CONCEALED.
4
'
-
1
"
6"
1' - 2"
1/2"
SHELF DEPTH
1' - 0" MIN.
1/4" ADJUSTABLE METAL
PEGS FOR SHELVING
UNDER CABINET LED
LIGHTING, REFER TO
RCP FOR LOCATION
1
1
/
2
"
1/
8
"
2'
-
1
0
"
1
1
/
2
"
1
1
/
2
"
1/
8
"
6"
1/
8
"
1
1
/
2
"
1/
8
"
7
7
/
8
"
1/
8
"
1
1
/
2
"
1/
8
"
7
7
/
8
"
1/
8
"
1
1
/
2
"
4"
U.N.O.
2' - 0"
COUNTERTOP PER
FINISH SCHEDULE;
EASED EDGE PROFILE
4"
SOLID WOOD INSET
SHAKER CABINET
DOOR PER INT. ELE.
SOLID WOOD
DRAWERS WITH SOFT
CLOSING DRAWER
SLIDES, TYP.
SOLID WOOD FACE
FRAME
SOLID WOOD INSET
FLUSH FACE CABINET
DRAWER; SOFT
CLOSING DRAWER
SLIDES
NOTES:
1. CABINET FINISH PER FINISH SCHEDULE.
2. CONTRACTOR TO PROVIDE SAMPLES AND SHOP DRAWINGS
3. ALL FASTENERS AND ADHESIVE TO BE USED AS NEEDED AND CONCEALED.
7"
7"
5"
4'
-
0
"
1
1
/
2
"
1
1
/
2
"
3'
-
3
1
/
2
"
1
1
/
2
"
4"
1' - 8"
COUNTERTOP PER
INTERIOR ELEVATIONS;
EASED EDGE PROFILE EQ
EQ
EQ
EQ
FRAME TO ALIGN WITH
COUNTERTOP EDGE
1" THICK ADJUSTABLE
SHELVES TO MATCH
CABINET @ LOWER
CABINET; METAL PINS
FINISHED PLYWOOD
INTERIOR, TYP.
7'
-
0
"
4"
1
1
/
2
"
2'
-
3
"
1
1
/
2
"
4'
-
0
1
/
4
"
1
3
/
4
"
1" THICK ADJUSTABLE
SHELVES TO MATCH
CABINET @ UPPER CABINET
METAL ADJUSTABLE
PINS, TYP.
REFER TO PLAN
2'-0" UNO
WD2 TYP.
2'
-
1
0
"
1
1
/
2
"
1
1
/
2
"
1/
4
"
2'
-
1
"
1/
4
"
1
1
/
2
"
4"
3/4"
4"
2' - 0"
PER INTERIOR
ELEVATIONS; EASED EDGE
PROFILE
SOLID WOOD INSET
SHAKER CABINET
DOOR; SOFT CLOSE
INSET HINGES, TYP.
1" ADJUSTABLE SOLID
WOOD SHELF
1/4" ADJUSTABLE METAL
PEGS FOR SHELVING
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
1 1/2" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
2
:
3
1
P
M
A5.07
INTERIOR DETAILS
& CASEWORK
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1 1/2" = 1'-0"A5.07
1 FULL HEIGHT CABINET
1 1/2" = 1'-0"A5.07
3 BASE CABINET - UPPER DRAWER
1 1/2" = 1'-0"A5.07
4 UPPER CABINET
1 1/2" = 1'-0"A5.07
7 BASE CABINET - 3 DRAWERS
1 1/2" = 1'-0"A5.07
8 CASEWORK - CUBBIES
1 1/2" = 1'-0"A5.07
5 FULL HEIGHT CABINET - OPEN SHELVING
1 1/2" = 1'-0"A5.07
11 BASE CABINET
No. Description Date
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
TYPE B1
INTERIOR
SINGLE SWING DOOR
FLAT 2 PANEL
TYPE C1
INTERIOR
DOUBLE SWING DOOR
TWO LITE
REMARKS
TYPE A1
INTERIOR
OPENING
TYPE D1
EXTERIOR
SINGLE SWING DOOR
WOOD PANEL, UPPER LITE
TYPE E
EXTERIOR
SINGLE SWING DOOR
WOOD PANEL
TYPE F
EXTERIOR
DOUBLE SWING DOOR
A. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL
MATERIALS SHALL BE REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND
REPAIR OR ORIGINAL BUILDING FEATURES ARE MISSING, ALL NEW
MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITIATION.
B. ANY EXISTING DETAIL OR FEATURE INCLUDING PROFILES, WINDOW LUGS,
HARDWARE, ETC IS TO BE RESTORED AND REUSED IF INTACT OR
RECREATED TO MATCH ORIGINAL IF MISSING.
C. GLAZING AT DOORS AND WINDOWS TO BE TRUE DIVIDED LITES WHERE
OCCURS AND TEMPERED GLASS PER GALZING NOTES ON A6.02.
D. LABEL, BUNDLE, & BAG ALL SALVAGED HARDWARE TO CORRESPOND TO
DOOR SCHEDULE. STRIP & CLEAN SALVAGED HARDWARE AS NEEDED FOR
REUSE.
E. INSTALL EXTERIOR FLASHING INTEGRATED WITH THE DRAINAGE PLANE
(CAL GREEN 5.407.2.2.2)
F. ALL DOOR THRESHOLDS TO BE ACCESSIBLE. REFER TO DETAIL
TYPE B2
INTERIOR
SINGLE SWING DOOR
TWO LITE
TYPE B3
INTERIOR
SINGLE SWING DOOR
SINGLE LITE
FLAT BOTTOM PANEL
TYPE A2
INTERIOR
OPENING
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
DOOR FRAME DAMAGED BEYOND REPAIR. REBUILD NEW TO MATCH (E)
OPENING.
CASING DAMAGED BEYOND REPAIR. REBUILD TO MATCH ORIGINAL.
SALVAGE & REUSE (E) HARDWARE. MATCH ORIGINAL WHERE MISSING.
ORIGINAL DOOR NO LONGER IN PLACE. REBUILD NEW TO MATCH
HISTORICAL DRAWINGS IN (E) OPENING.
IF MATERIAL IS SALVAGEABLE. RELOCATE AS NOTED ON PLANS &
ELEVATIONS. NOTIFY ARCHITECT AND OWNER IF FRAMES OR CASING
CANNOT BE REUSED.
SALVAGE AND RESTORE INTACT ORIGINAL MATERIAL. NOTIFY ARCHITECT
IF SPECIFIC COMPONENTS CANNOT BE REUSED.
INSTALL NEW CROWN CASING TO MATCH ORIGINAL WHERE MISSING.
INSTALL NEW APRON TO MATCH ORIGINAL WHERE MISSING.
REMOVE ALL BROKEN GLASS AND INSTALL NEW.
REPAIR CASING TO MATCH ORIGINAL.
INSTALL NEW CASING & CROWN TO MATCH ORIGINAL.
CARD READER ACCESS
LOW-ENERGY POWER-OPERATED DOOR. PROVIDE POLE MOUNTED PUSH
BOTTONS AT EXTERIOR OF DOOR PER PLAN.
TYPE D2
EXTERIOR
SINGLE SWING DOOR
WOOD PANEL, UPPER LITE
PE
R
S
C
H
E
D
U
L
E
DO
O
R
H
E
I
G
H
T
1'
-
5
"
PE
R
S
C
H
E
U
D
L
E
DO
O
R
H
E
I
G
H
T
1'
-
3
"
9"
9"
1'
-
4
"
9"9"9"9"
3'
-
5
"
6"
6"
2'
-
0
"
6"
1'
-
0
"
6"
NOTE: TYP DIMENSIONS
FOR PANEL DOOR
TYPES B, C & D
LO
C
A
T
E
D
B
E
T
W
E
E
N
3
4
"
-
4
4
"
OP
E
R
A
B
L
E
D
O
O
R
H
A
R
D
W
A
R
E
9"9"
9"
1'
-
0
"
1'
-
7
"
9"
6'
-
8
"
M
I
N
.
DOOR GENERAL NOTES
8
A5.00
HW #1 (LARGE DOUBLE DOORS)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
6 HINGE CUSTOM HEAVY DUTY METAL T HINGE - TBD
TO MATCH HISTORIC PHOTO
2 PULL PLATE - INSIDE TBD
1 DEADBOLT TBD
1 SET SEALS TBD
1 MEETING STILE SEAL TBD
1 KICKPLATE - INSIDE TBD
1 CANE BOLTS TBD
1 THRESHOLD AS DETAILED
NOTE:
1. CONTRACTOR TO SUBMIT DOOR HARDWARE THAT IS APPRPRIATE FOR THE SCALE OF THESE DOORS.
PROVIDE SHOP DRAWINGS AND HARDWARE SPCIFICATIONS PRIOR TO FABRICATION.
2. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD WITH ARCHITECT PRIOR TO INSTALLATION.
3. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
HW #2 (MAIN ENTRY DOOR - LOW ENERGY POWER OPERATED)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 HINGE 5BB1 640 IVE
1 LOCKSET / PANIC BAR 5575-L06 ELECTRIFIED 613 VON
1 POWER OPERATOR 4642 LCN
1 ACTUATOR BUTTON HI/LOW POST MOUNTED - TBD
1 FLOOR STOP FS439 704 IVE
1 SET SEALS 488-S x 3M x MITRED TBD ZER
1 DOOR BOTTOM 364LS Z49 AA ZER
1 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
NOTE:
1. PROVIDE LOW VOLTAGE AND HARDWARE REQUIRED FOR LOW-ENERGY POWER OPERATOR. HI/LOW
PUSH BUTTON OPERATOR POST MOUNTED PER PLAN.
2. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD WITH ARCHITECT PRIOR TO INSTALLATION.
3. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
HW #3 (EXTERIOR - STAFF)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 HINGE 5BB1 640 IVE
1 LEVER LOCKSET ND50 RHO 613 SCH
1 CLOSER 4110-3049EDA-72MC, DEL, AVB 616 LCN
1 FLOOR STOP FS439 704 IVE
1 SET SEALS 488-S x 3M x MITRED TBD ZER
1 DOOR BOTTOM 364LS Z49 AA ZER
1 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
NOTE:
1. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD WITH ARCHITECT PRIOR TO INSTALLATION.
2. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
HW #4 (EXTERIOR EXIT DOOR) PH
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 HINGE 5BB1 640 IVE
1 LOCKSET 5575-L06 613 VON
1 CLOSER 4110-3049EDA-72MC, DEL, AVB 616 LCN
1 FLOOR STOP FS439 704 IVE
1 SET SEALS 488-S x 3M x MITRED TBD ZER
1 DOOR BOTTOM 364LS Z49 AA ZER
1 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
NOTE:
1. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD WITH ARCHITECT PRIOR TO INSTALLATION.
2. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
MANUFACTURERS ABBREVIATIONS:
ARC = ARCADIA ALUMINUM STOREFRONT DOOR HARDWARE
IVE = IVES HINGES & DOOR STOPS
LCN = LCN DOOR CLOSER
TRI=TRIMCO PUSH/PULL
SCH = SCHLAGE LOCK CO. LOCKS, LATCHES AND CYLINDERS
ZER = ZERO INTERNATIONAL THRESHOLDS, SET SEALS AND DOOR SWEEPS
HARDWARE GROUPS
HW #5 (EXTERIOR - STAFF, CARD READER)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 HINGE 5BB1 640 IVE
1 LEVER LOCKSET AD-400 RHO 643e SCH
1 CLOSER 4110-3049EDA-72MC, DEL, AVB 616 LCN
1 FLOOR STOP FS439 704 IVE
1 SET SEALS 488-S x 3M x MITRED TBD ZER
1 DOOR BOTTOM 364LS Z49 AA ZER
1 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
NOTE:
1. PROVIDE LOW VOLTAGE TO THIS DOOR FOR CARD READER ACCESS CONTROL. CONFIRM ACCESS
CONTROL SYSTEM CONNECTS TO EXISTING ACCESS CONTROL SYSTEM.
2. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD W ITH ARCHITECT PRIOR TO INSTALLATION.
3. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
HW #6 (INTERIOR - MULTI-PURPOSE DOUBLE DOOR)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
6 HINGE 5BB1 640 IVE
1 LEVER LOCKSET ND70 RHO 613 SCH
2 CLOSER 4110-3049EDA-72MC, DEL, AVB 616 LCN
2 FLOOR STOP FS439 704 IVE
2 SET SEALS 488-S x 3M x MITRED TBD ZER
1 MEETING STILE SEAL 56/156 D ZER
2 DOOR SHOE 254 A ZER
2 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
NOTE:
1. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD W ITH ARCHITECT PRIOR TO INSTALLATION.
2. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
HW #7 (INTERIOR - MULTI-PURPOSE SINGLE DOOR)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 HINGE 5BB1 640 IVE
1 LEVER LOCKSET ND70 RHO 613 SCH
1 CLOSER 4110-3049EDA-72MC, DEL, AVB 616 LCN
1 FLOOR STOP FS439 704 IVE
1 SET SEALS 488-S x 3M x MITRED TBD ZER
1 DOOR SHOE 254 A ZER
1 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
NOTE:
1. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD W ITH ARCHITECT PRIOR TO INSTALLATION.
2. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
HW #8 (PUBLIC RESTROOM)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 HINGE 5BB1 640 IVE
1 PUSH PLATE 8200 613 IVE
1 PULL PLATE 8302 613 IVE
1 DEADBOLT B561 613 SCH
1 CLOSER 4110-3049EDA-72MC, DEL, AVB 616 LCN
1 FLOOR STOP FS439 704 IVE
1 SET SEALS 488-S x 3M x MITRED TBD ZER
1 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
1 THRESHOLD AS DETAILED
NOTE:
1. COORDINATED MOUNTING HEIGHTS OF PUSH/PULL PLATE AND CYLINDER WITH REQUIRED
ACCESSIBILITY MOUNTING HEIGHTS, PROVIDE SHOP DRAWINGS PRIOR TO FABRICATION.
2. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD W ITH ARCHITECT PRIOR TO INSTALLATION.
3. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
HW #9 (INTERIOR - STAFF, CARD READER)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 HINGE 5BB1 640 IVE
1 LEVER LOCKSET AD-400 RHO 643e SCH
1 CLOSER 4110-3049EDA-72MC, DEL, AVB 616 LCN
1 FLOOR STOP FS439 704 IVE
1 SET SEALS 488-S x 3M x MITRED TBD ZER
1 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
NOTE:
1. PROVIDE LOW VOLTAGE TO THIS DOOR FOR CARD READER ACCESS CONTROL. CONFIRM ACCESS
CONTROL SYSTEM CONNECTS TO EXISTING ACCESS CONTROL SYSTEM.
2. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD W ITH ARCHITECT PRIOR TO INSTALLATION.
3. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
HW #10 (JANITOR)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 HINGE 5BB1 640 IVE
1 LEVER LOCKSET ND80 RHO 613 SCH
1 CLOSER 4110-3049EDA-72MC, DEL, AVB 616 LCN
1 FLOOR STOP FS439 704 IVE
1 SET SEALS 488-S x 3M x MITRED TBD ZER
1 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
NOTE:
1. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
2. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD W ITH ARCHITECT PRIOR TO INSTALLATION.
HW #11 (STAFF RESTROOM)
QTY DESCRIPTION CATALOG NUMBER FINISH MFR
3 HINGE 5BB1 640 IVE
1 LEVER LOCKSET ND40 RHO W/ INDICATOR 613 SCH
1 CLOSER 4110-3049EDA-72MC, DEL, AVB 616 LCN
1 FLOOR STOP FS439 704 IVE
1 SET SEALS 488-S x 3M x MITRED TBD ZER
1 KICKPLATE 8400 12" X FULL DOOR B-CS 613 IVE
1 THRESHOLD AS DETAILED
NOTE:
1. COORDINATE LOCATION OF FLOOR STOP IN THE FIELD W ITH ARCHITECT PRIOR TO INSTALLATION.
2. COORDINATE KEYING WITH BUILDING OWNERS' MASTER KEY SYSTEM.
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
3/8" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
2
:
3
2
P
M
A6.00
DOOR & WINDOW
SCHEDULE
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
DOOR SCHEDULE
DO
O
R
#
LOCATION
SCOPE / PHASE TY
P
E
DOOR MEASUREMENTS
HA
R
D
W
A
R
E
G
R
O
U
P
PA
N
I
C
H
A
R
D
W
A
R
E
DOOR FRAME DETAIL
REMARKSRO
O
M
#
NAME WI
D
T
H
HE
I
G
H
T
TH
I
C
K
N
E
S
S
MATERIAL FRAME GL
A
Z
I
N
G
MATERIAL FINISH HE
A
D
JA
M
B
TH
R
E
S
H
O
L
D
01 02 MULTI-PURPOSE ROOM A (N) EXTERIOR DOOR / (E)
OPENING
F 10' - 6" 10' - 6" 2" WD PT GL-1 WD PT 13C/A5.06 CUSTOM DOOR TO MATCH HISTORIC. TRUE DIVIDED LITES. DECORATIVE IRON BARN DOOR
HINGES. REFER TO REMARK # 4,6
02 02 MULTI-PURPOSE ROOM A (N) EXTERIOR DOOR / (E)
OPENING
F 10' - 6" 10' - 6" 2" WD PT GL-1 WD PT 13C/A5.06 CUSTOM DOOR TO MATCH HISTORIC. TRUE DIVIDED LITES. DECORATIVE IRON BARN DOOR
HINGES. REFER TO REMARK # 4,6
03 01 ENTRY / CHECK IN OFFICE (N) EXTERIOR DOOR / (E)
OPENING
E 3' - 6" 6' - 8" 1 3/4" YES WD PT - WD PT 13D/A5.06 CUSTOM WOOD PANEL + GLASS DOOR TO MATCH HISTORIC. REPAIR CONCRETE
THRESHOLD. REFER TO REMARK # 13
04 01 ENTRY / CHECK IN OFFICE (N) EXTERIOR DOOR / (E)
OPENING
D1 3' - 0" 6' - 8" 1 3/4" WD PT GL-1 WD PT 13D/A5.06 CUSTOM WOOD PANEL + 3 OVER 3 TRUE DIVIDED LITE GLASS DOOR TO MATCH HISTORIC.
OVERHEAD OPERABLE TRANSOM. REPAIR CONCRETE THRESHOLD.
05 04 HALLWAY (N) EXTERIOR DOOR / (E)
OPENING
D1 3' - 0" 6' - 8" 1 3/4" YES WD PT GL-1 WD PT 13C/A5.06 CUSTOM WOOD PANEL + 3 OVER 3 TRUE DIVIDED LITE GLASS DOOR TO MATCH HISTORIC.
OVERHEAD OPERABLE TRANSOM. REPAIR CONCRETE THRESHOLD.
06 05 TRAINING ROOM C DEMO & INFILL - 3' - 0" 6' - 8" 1" - -- - - - - - OPENING NOT ORIGINAL TO BUILDING
07 10 OFFICE AND BREAKROOM (N) EXTERIOR DOOR / (E)
OPENING
D2 3' - 0" 6' - 8" 1 3/4" WD PT GL-1 WD PT 13C/A5.06 CUSTOM WOOD PANEL + 3 OVER 3 TRUE DIVIDED LITE GLASS DOOR TO MATCH HISTORIC.
OVERHEAD OPERABLE TRANSOM. DEMO (E) CONCRETE THRESHOLD. REFER TO REMARK
#12.
08 11 RESTROOM REMOVE & SALVAGE - 3' - 0" 6' - 8" 1 3/4" - -- - - - - - INFILL, REFER TO WINDOW SCHEDULE
09 07 WOMENS REMOVE & SALVAGE - 3' - 0" 6' - 8" 1 3/4" - - - -- - - - INFILL, REFER TO WINDOW SCHEDULE
11 01 ENTRY / CHECK IN OFFICE NEW - INTERIOR A2 4' - 0" 0" - - - - - 13A/A5.06 ARCHED OPENING, REFER TO INTERIOR ELEVATIONS
12 03 TRAINING ROOM B NEW - INTERIOR C1 6' - 0" 6' - 8" 1 3/4" WD PT GL-1 WD PT 10/A5.06 9/A5.06 13A/A5.06 REFER TO REMARKS #11
13 04 HALLWAY NEW - INTERIOR A2 4' - 0" 6' - 8" - - - WD PT - - 13A/A5.06
14 05 TRAINING ROOM C NEW - INTERIOR B2 3' - 0" 6' - 8" 1 3/4" WD PT GL-1 WD PT 10/A5.06 9/A5.06 13A/A5.06 REFER TO REMARKS #11
15 06 HALLWAY NEW - INTERIOR A2 4' - 6" 6' - 8" - - - WD PT - - 13A/A5.06
16 07 WOMENS NEW - INTERIOR B1 3' - 0" 6' - 8" 1 3/4" WD PT -WD PT 10/A5.06 9/A5.06 13B/A5.06 REFER TO REMARKS #11
17 09 MENS NEW - INTERIOR B1 3' - 0" 6' - 8" 1 3/4" WD PT - WD PT 10/A5.06 9/A5.06 13B/A5.06 REFER TO REMARKS #11
18 10 OFFICE AND BREAKROOM NEW - INTERIOR B3 3' - 0" 6' - 8" 1 3/4" WD PT GL-1 WD PT 10/A5.06 9/A5.06 13A/A5.06 REFER TO REMARKS #11, 12
19 10 OFFICE AND BREAKROOM NEW - INTERIOR A1 3' - 0" 6' - 8" - - - - - 13A/A5.06
20 12 JANITOR NEW - INTERIOR B1 3' - 0" 6' - 8" 1 3/4" WD PT - WD PT 10/A5.06 9/A5.06 13A/A5.06 REFER TO REMARKS #11
21 11 RESTROOM NEW - INTERIOR B1 2' - 10" 6' - 8" 1 3/4" WD PT - WD PT 10/A5.06 9/A5.06 13B/A5.06 REFER TO REMARKS #11
DOOR TYPES
ARCHED
N/A
-
-
-
-
ARCHED
ARCHED
No. Description Date
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
NOTE: WINDOW SCHEDULE MOVED TO SHEET A6.02
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
4/
7
/
2
0
2
5
9
:
2
2
:
3
5
P
M
A6.01
EXISTING WINDOW
INVENTORY
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1 WINDOW 01 + DOOR 03 - ENTRY2WINDOW 02 + DOOR 04 - SIDE ENTRY3WINDOW 03 + WINDOW 044WINDOW 05 + WINDOW 06
5 WINDOW 07+08+09+106WINDOW 11+12+137WINDOW 148WINDOW 15
9 WINDOW 16 - ORIGINAL OPENING, NEW WINDOW10 WINDOW 1711 WINDOW 19 + DOOR 0812 WINDOW 21+22+23+24
13 WINDOW 25 - ARCHED WINDOW WITH STEEL DIVIDED LITES
SALVAGE & REUSE TRANSOM &
HARDWARE
INTERIOR SILL & APRON
MISSING
CASING CROWN MISSING AT
DOOR & WINDOW
CONCRETE THRESHOLD
DAMAGED
WINDOWS & CASING DAMAGED
BEYOND REPAIR FROM FIRE.
INSTALL NEW TO MATCH
ORIGINAL.
ORIGINAL CASING, CROWN, SILL
& APRON INTACT.
ORIGINAL WINDOW FRAMES &
HARDWARE INTACT.
REMOVE BROKEN GLASS AND
INSTALL NEW.
RESTORE WINDOW, CASING, &
HARDWARE
ORIGINAL WINDOW HAS BEEN
REMOVED. INSTALL NEW
WINDOW TO MATCH EXISTING
OPENING.
REPAIR (E) CASING TO MATCH
INSTALL NEW GLASS TO MATCH
ORIGINAL WHERE MISSING.
NEW APRON TO MATCH ORIGINAL
SALVAGE ORIGINAL
HARDWARE AT OPERABLE
CASEMENT
INSTALL NEW CASING
CROWN
WINDOWS TO BE
RELOCATED. SALVAGE
FRAMES, CASING, &
HARDWARE
INSTALL NEW APRONS
WINDOWS DAMAGED BEYOND REPAIR. INSTALL
NEW TO MATCH ORIGINAL.
SALVAGE & REUSE TRANSOM & HARDWARE
RESTORE (E) WINDOW. INSTALL
NEW APRON
WINDOW DAMAGED BEYOND
REPAIR. REBUILD WINDOW
TO MATCH ORIGINAL.
SALVAGE & REUSE EXISTING
SILL & APRON & CASING.
MISSING CROWN CASING.
WINDOWS DAMAGED IN FIRE.
REBUILD WINDOWS & CASING TO MATCH ORIGINAL IF
NOT SALVAGABLE.
MISSING CASING CROWN & APRON.
DOOR, WINDOWS & CASING
DAMAGED BEYOND REPAIR
FROM FIRE. INSTALL NEW TO
MATCH ORIGINAL.
WINDOWS DAMAGED BEYOND REPAIR.
REBUILD WINDOWS & CASING TO MATCH
ORIGINAL.
WINDOW MAY BE DAMAGED
BEYOND REPAIR.
REBUILD WINDOWS & CASING TO
MATCH ORIGINAL IF NOT
SALVAGABLE.
DAMAGED CASING &
MISSING CASING CROWN.
DOOR TO BE INFILLED. SALVAGE
TRANSON FRAME & CASING IF
POSSIBLE.
WINDOW & CASING, SILL, APRON,
& CROWN INTACT. RESTORE &
REUSE.
WINDOW & CASING, SILL, &
CROWN INTACT. RESTORE &
REUSE. RESTORE MISSING
APRONS.
13 WINDOW 26- OVER HEAD FRONT ENTRY WITH GRILLE
No. Description Date
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
TYPE A
FIXED
REMARKS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
TYPE B
DOUBLE HUNG
TYPE C
DOUBLE HUNG
WITH TRANSOM
TYPE D
FIXED ARCHED
NOTE:
WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL
MATERIALS SHALL BE REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND
REPAIR OR ORIGINAL BUILDING FEATURES ARE MISSING, ALL NEW
MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
ANY EXISTING DETAIL OR FEATURE INCLUDING PROFILES, WINDOW LUGS,
HARDWARE, ETC IS TO BE RESTORED AND REUSED IF INTACT OR
RECREATED TO MATCH ORIGINAL IF MISSING.
GLAZING AT WINDOWS TO BE TRUE DIVIDED LITES WHERE OCCURS.
LABEL, BUNDLE, & BAG ALL SALVAGED HARDWARE TO CORRESPOND TO
DOOR SCHEDULE. STRIP & CLEAN SALVAGED HARDWARE AS NEEDED FOR
REUSE.
REFER TO SHEET A6.01 EXISTING WINDOW INVENTORY FOR ADDITIONAL
REFERENCE.
ALL WINDOWS TO HAVE INTERIOR MOUNTED MANUAL ROLLER SHADES.
TYPE E
CASEMENT
WINDOW FRAME DAMAGED BEYOND REPAIR. REBUILD TO MATCH
ORIGINAL.
CASING DAMAGED BEYOND REPAIR. REBUILD TO MATCH ORIGINAL.
SALVAGE & REUSE (E) HARDWARE. MATCH ORIGINAL WHERE MISSING.
NEW WINDOW TO MATCH ORIGINAL IN (E) OPENING.
IF MATERIAL IS SALVAGEABLE. RELOCATE AS NOTED ON PLANS &
ELEVATIONS. NOTIFY ARCHITECT AND OWNER IF FRAMES OR CASING
CANNOT BE REUSED.
SALVAGE AND RESTORE INTACT ORIGINAL MATERIAL. NOTIFY ARCHITECT
IF SPECIFIC COMPONENTS CANNOT BE REUSED.
INSTALL NEW CROWN CASING TO MATCH ORIGINAL WHERE MISSING.
INSTALL NEW APRON TO MATCH ORIGINAL WHERE MISSING.
REMOVE ALL CRACKED AND BROKEN GLASS AND INSTALL NEW .
REPAIR CASING TO MATCH ORIGINAL.
TYPE F
FIXED
DIVIDED LITES
TYPE G
ARCHED FRONT WINDOW
DOOR PER
SCHEDULE
GLAZING
1. PROVIDE SAFETY GLAZING / TEMPERED GLASS PER CBC 2406 AT
THE FOLLOWING HAZARDOUS LOCATIONS:
A. ALL GLAZING IN FIXED AND OPERABLE PANELS OF DOORS
B. ALL GLAZING WITHIN 24" OF AN ADJACENT DOOR
WINDOW TYPES
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
3/8" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
2
:
3
6
P
M
A6.02
WINDOW
SCHEDULE
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
WINDOW SCHEDULE
WI
N
D
O
W
#
LOCATION
SCOPE / PHASE TY
P
E
WINDOW MEASUREMENTS FRAME
GL
A
Z
I
N
G
DETAIL
REMARKSRO
O
M
#
NAME WI
D
T
H
HE
I
G
H
T
SI
L
L
H
E
I
G
H
T
MATERIAL FINISH HE
A
D
JA
M
B
SI
L
L
1 (N) WINDOW / (E) OPENING G 8' - 8" 7' - 0" WD PT GL-1 CUSTOM FIXED GLAZING TO MATCH HISTORICAL DRAWINGS. REFER TO REMARK #: 1, 2,3,4
2 01 ENTRY / CHECK IN OFFICE (N) WINDOW / (E) OPENING B 3' - 0" 5' - 1" 3' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 1,2,3,4
3 03 TRAINING ROOM B (E) WINDOW / RELOCATE & RESTORE B 3' - 0" 5' - 1" 4' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 3,5,6,7,8,9
4 03 TRAINING ROOM B (E) WINDOW / RELOCATE & RESTORE B 3' - 0" 5' - 1" 4' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 3,5,6,7,8,9
5 03 TRAINING ROOM B (N) WINDOW / (E) OPENING B 2' - 8" 5' - 1" 4' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 1,2,3,4
6 03 TRAINING ROOM B (N) WINDOW / (E) OPENING B 2' - 8" 5' - 1" 4' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 1,2,3,4
7 04 HALLWAY (E) WINDOW / RELOCATE & RESTORE E 1' - 6" 3' - 0" 4' - 1" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 3,5,6,7,8,9
8 (E) WINDOW / RELOCATE & RESTORE B 2' - 0" 5' - 1" 3' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 3,5,6,7,8,9
9 (E) WINDOW / RELOCATE & RESTORE B 2' - 0" 5' - 1" 3' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 3,5,6,7,8,9
10 04 HALLWAY (E) WINDOW / RELOCATE & RESTORE E 1' - 6" 3' - 0" 4' - 1" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 3,5,6,7,8,9
11 05 TRAINING ROOM C (E) WINDOW / RESTORE C 3' - 0" 4' - 6" 3' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 3,6,7,8,9
12 05 TRAINING ROOM C (N) WINDOW / (E) OPENING C 3' - 0"4' - 6" 3' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 1,2,3,4
13 05 TRAINING ROOM C (N) WINDOW / (E) OPENING C 3' - 0"4' - 6" 3' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #: 1,2,3,4
14 10 OFFICE AND BREAKROOM (E) WINDOW / RESTORE B 2' - 0" 4' - 6" 3' - 7" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 ORIGINAL WINDOW AND CASING INTACT. REFER TO REMARK #: 6, 9
15 (N) WINDOW / (E) OPENING B 3' - 0" 5' - 1" 3' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 ORIGINAL SILL, CASING, & APRON INTACT. REFER TO REMARK #: 1,3,4,7,9
16 10 OFFICE AND BREAKROOM (N) WINDOW / (E) OPENING A 1' - 6" 3' - 0" 5' - 1" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 ORIGINAL WINDOW LOCATION PREVIOUSLY INFILLED.
17 10 OFFICE AND BREAKROOM (E) WINDOW / RELOCATE & RESTORE B 2' - 6" 5' - 1" 3' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK #5, 6, 7,9,10
18 11 RESTROOM NEW F 3' - 0" 2' - 6" 5' - 7" WD PT GL-2 3/A5.06 3/A5.06 2/A5.06 NEW WINDOW IN (E) OPENING
19 09 MENS DEMO B 3' - 0" 5' - 1" 3' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 SALVAGE PARTS IF POSSIBLE FOR REUSE ELSEWHERE. REFER TO REMARK #6.
19.1 09 MENS NEW F 3' - 0" 2' - 6" 5' - 7" WD PT GL-2 3/A5.06 3/A5.06 2/A5.06 NEW WINDOW IN (E) OPENING
20 07 WOMENS NEW F 3' - 0" 2' - 6" 5' - 7" WD PT GL-2 3/A5.06 3/A5.06 2/A5.06 NEW WINDOW IN (E) OPENING
21 02 MULTI-PURPOSE ROOM A (E) WINDOW / RESTORE B 3' - 0" 5' - 1" 5' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK # 3,6,8,9
22 02 MULTI-PURPOSE ROOM A (E) WINDOW / RESTORE B 3' - 0" 5' - 1" 5' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK # 3,6,8,9
23 02 MULTI-PURPOSE ROOM A (E) WINDOW / RESTORE B 3' - 0" 5' - 1" 5' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK # 3,6,8,9
24 02 MULTI-PURPOSE ROOM A (E) WINDOW / RESTORE B 3' - 0" 5' - 1" 5' - 0" WD PT GL-1 3/A5.06 3/A5.06 2/A5.06 REFER TO REMARK # 3,6,8,9
25 02 MULTI-PURPOSE ROOM A (E) WINDOW / RESTORE D 2' - 6" 6' - 4" 4' - 10" WD/ST PT GL-1 - - - STEEL DIVIDED LITE WINDOW IN WOOD FRAME. REFER TO REMARK # 8,9,10
26 (N) WINDOW / (E) OPENING F 3' - 8" 3' - 0" 11' - 11 1/8" WD PT GL-2 RESTORE METAL DECORATIVE GRILLE. REFER TO REMARK #101ENTRY / CHECK IN OFFICE
6' -1"
6' -1"
6' -1"
01 ENTRY / CHECK IN OFFICE 2' - 10"
No. Description Date
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
REF.
1006 SF
MULTI-PURPOSE
ROOM A
02
212 SF
ENTRY / CHECK
IN OFFICE
01
348 SF
TRAINING ROOM
B
03
95 SF
HALLWAY
04
375 SF
TRAINING ROOM
C
05
HALLWAY
06
162 SF
WOMENS
07 139 SF
MENS
09
273 SF
OFFICE AND
BREAKROOM
10
56 SF
RESTROOM
11
15 SF
JANITOR
12
03-04
FINISH NOTES
1. ALL INTERIOR FINISHES SELECTED SHALL CONFORM TO THE REQUIREMENTS OF THE 2019
CALIFORNIA BUILDING CODE, CHAPTER 8 AND THE 2019 CALIFORNIA GREEN BUILDING
STANDARDS CODE, CHAPTER 5. INTERIOR WALL AND CEILING FINISHES SHALL BE
CLASSIFIED AS CLASS C.
2. TOILET AND JANITORIAL ROOM FLOOR FINISH MATERIAL SHALL HAVE A SMOOTH, HARD,
NON-ABSORBENT SURFACE. INTERSECTION OF FLOORS WITH WALLS SHALL HAVE A
SMOOTH, HARD, NON-ABSORBENT VERTICAL BASE THAT EXTENDS UPWARD ONTO WALLS
NOT LESS THAN 4" CBC SECTION 1210.2.1
3. WALLS AND PARTITIONS WITHIN 2'-0" OF SERVICE SINKS, URINALS AND WATER CLOSETS
SHALL HAVE A SMOOTH, HARD, NON-ABSORBENT SURFACE WHICH EXTENDS UPWARD ONTO
WALLS NOT LESS THAN 4'-0". CBC SECTION 1210.2.2
4. SUBSTITUTIONS, REVISIONS OR CHANGES MUST HAVE APPROVAL OF ARCHITECT PRIOR TO
PURCHASE AND INSTALLATION.
5. ALL PAINTED GYP. BD. SURFACES TO HAVE LIGHT STIPPLE FINISH, U.O.N. ALL GYP. BD.
SURFACES TO RECEIVE WALL COVERING SHALL HAVE MINIMUM LEVEL 5 SMOOTH FINISH. ALL
WALL COVERING TO BE FROM THE SAME PRODUCTION RUN OR DYE LOT.
6. ALL PAINT FINISHES TO HAVE UNDERCOAT AND ONE OR MORE COLOR COATS AS REQUIRED
BY SPECIFICATION FOR COMPLETE AND CONSISTENT COVERAGE. PROVIDE 8-1/2" X 11" PAINT
BRUSHOUT FOR DESIGNER'S APPROVAL.
7. ALL WALLS AND LOW PARTITIONS TO BE FINISH PT-1 U.O.N.
8. VERIFY WITH ARCHITECT AT BEGINNING OF PROJECT WHICH ELEMENTS ARE TO BE PAINTED.
9. EXISTING CONCRETE SLAB SHALL BE PREPARED AND SEALED FROM MOISTURE PER
MANUFACTURER'S WRITTEN INSTRUCTIONS.
10. FLOAT ALL AREA WHERE FLOOR IS NOT LEVEL OR TRUE PRIOR TO FLOOR INSTALLATION.
11. CARPET CONTRACTOR MUST VERIFY EXISTING FLOOR CONDITIONS PRIOR TO INSTALLATION.
12. ALL CARPET INSTALLED SHALL COMPLY WITH CBC SECTION 11B-302.2. ALL CARPET TO BE
FROM THE SAME DYE LOT IN OPEN OR HIGH VISIBILITY AREAS.
13. PROVIDE APPROPRIATE FLOOR TRANSITIONS BETWEEN DIFFERING FLOOR TREATMENTS.
PROVIDE SCHLUTER TRANSITION STRIPS WHERE TILE BUTTS A FLOOR FINISH IN A MANNER
OTHER THAN FLUSH. USE VINYL TRANSITION STRIPS WHERE CARPET MEETS VCT, SHEET
GOODS OR CONCRETE.
14. PROVIDE & INSTALL ALL FLOORING IN ACCORDANCE W/ MANUFACTURER'S WRITTEN
INSTRUCTIONS.
KEYNOTES
LEGEND
FINISH DESIGNATION. REFER TO FINISH LEGEND FOR
FINISH SPECIFICATIONS
DIRECTION OF PATTERN / LINES OF FLOORING
XXXX
ACOUSTICAL CEILING TILE
ACT1 ARMSTRONG LYRA PB, 24" X 24" OFFICE AND KITCHEN CIELING
GRID WHITE
CERAMIC TILE (INCLUDING PORCELAIN)
CT1 DAL-TILE COLOR WHEEL CLASSIC RESTROOM WALL TILE
6X6, IN RUNNING BOND PATTERN
FIELD COLOR: MATTE ARCTIC WHITE 0790
3X6 COVE BASE
CT2 2" x 2" MOSAIC PATTERN RESTROOM FLOOR TILE
DAL-TILE KEYSTONES
FIELD COLOR: CASTLEROCK (GROUP 3) D618
GLAZING
GL-1 SINGLE PANE, LOW E COATED, TYPICAL WINDOW AND DOOR GLAZING
REFER TO SPECS.
GL-2 SINGLE PANE, LOW E COATED, FROSTED RESTROOM WINDOWS
REFER TO SPECS
PARTITION
BOBRICK SIERRA SERIES (SCRC), SOLID COLOR RESTROOM TOILET PARTITIONS
REINFORCED COMPOSITE VANDAL-RESISTANT
OVERHEAD BRACED
COLOR: FOREST GREEN SC04
STANDARD HARDWARE, INCLUDE HEAVY DUTY FULL HEIGHT
STEEL BRACKETS, OCCUPANCY INDICATOR LATCH AND
GAP FREE DOORS AND STILES
PAINT
PT1 COLOR TBD EXTERIOR PLASTER WALLS
PT2 COLOR TBD EXTERIOR PLASTER ACCENT 1 (UPPER PLASTER)
PT3 COLOR TBD EXTERIOR PLASTER ACCENT 2 (BASE)
PT4 COLOR TBD (GREEN)EXTERIOR WOOD, TYPICAL (TRIM AND FRAMES)
PT5 COLOR TBD (LIGHT GREEN)EXTERIOR WOOD, ACCENT (TRIM AND FRAMES)
PAINT (CONTINUED):
PT6 COLOR TBD (RED)EXTERIOR WOOD DOORS, TYPICAL
PT7 COLOR TBD (ROSE)EXTERIOR WOOD, ACCENT (TRIM AND FRAMES)
PT8 COLOR (LIGHT GREEN)EXTERIOR METAL
PT10 COLOR TBD, EGGSHELL INTERIOR CEILINGS
PT11 COLOR TBD, EGGSHELL INTERIOR WALLS, TYPICAL
PT12 COLOR TBD, EGGSHELL INTERIOR WALLS, ACCENT
PT13 COLOR TBD, SEMI GLOSS INTERIOR WOOD (WINDOWS, DOORS, TRIM)
SOLID SURFACE MATERIAL
SSM1 CORIAN RESTROOM COUNTERTOPS
COLOR: DOMINO TERRAZZO (GROUP 12)
SSM2 CORIAN BREAK ROOM COUNTERTOPS
COLOR: CAMEO WHITE
WALL BASE
WB1 RUBBER COVE BASE, 4" TALL JANITORS
COLOR TBD
WB2 INTEGRAL CONCRETE COVE BASE, 6" TALL HALLWAY #06
COLOR TO MATCH (E) CONCRETE FLOOR
WB3 CONCRETE TILE BASE, 7 1/4" TALL x 2 3/4" MULTI-PURPOSE ROOM A
PACIFIC STONE, WB 135
SAND FINISH, COLOR TO MATCH (E) FLOOR
WB4 SOLID WOOD BASE, 6" TALL ENTRY, HALLWAY #04, OFFICE, TRAINING ROOM B & C
PAINT GRADE
WOOD
WD1 SOLID WOOD TRIM, PAINT GRADE ALL INTERIOR TRIM
WD2 CASEWORK, PAINT GRADE ALL CASEWORK
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
1/4" = 1'-0"
4/
7
/
2
0
2
5
9
:
2
2
:
3
8
P
M
A6.10
FINISH PLAN &
SCHEDULE
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/4" = 1'-0"A6.10
1 FLOOR PLAN - FINISH PLAN
COLORS, MATERIALS AND FINISHES
FINISH SCHEDULE
ROOM FLOOR BASE A - NORTH WALL B - EAST WALL C - SOUTH WALL D - WEST WALL CEILING
REMARKSNO. NAME MATERIAL FINISH MATERIAL MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
01 ENTRY / CHECK IN OFFICE (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10
02 MULTI-PURPOSE ROOM A (E) CONC WB3 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10
03 TRAINING ROOM B (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10
04 HALLWAY (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10
05 TRAINING ROOM C (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10
06 HALLWAY CONC WB2 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10
07 WOMENS CT CT2 CT1 CT CT1 CT CT1 CT CT1 CT CT1 GYP BD PT10
08 JAN. (E) CONC WB1 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 - -
09 MENS CT CT2 CT1 CT CT1 CT CT1 CT CT1 CT CT1 GYP BD PT10
10 OFFICE AND BREAKROOM (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 ACT ACT1
11 RESTROOM CT CT2 CT1 CT CT1 CT CT1 CT CT1 CT CT1 GYP BD PT10
12 JANITOR (E) CONC WB4 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT11 GYP BD PT10
03-04 CLEAN AND POLISH (E) CONCRETE FLOOR. EXISTING SCORING TO REMAIN.
No. Description Date
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
ALLEY
℄
NON-ORIGINAL CARPORT/
ENCLOSURE = 964 SQFT.
HISTORIC BUILDING = 3263 SQFT.
(E) RESIDENCE
(E) RESIDENCE
(E) RESIDENCE
PROPERTY LINE
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
PROPERTY LINE
02-32
TYP.
02-31
02
-39
TYP.
02-33
TYP.
02-36
TYP.
02-01
02-34TYP.
02-33
TYP.
02-34
TYP.
02-33
02-38
02-38
02-38
02-37
TYP.
02-36
02-37
TYP.
02-36
02-35
02-40
02-42
02-4402-44
02-43
02-4102-54
02-54
02-52
TYP.
02-53
TYP.
02-53
02-51
3' - 0"
24' - 10"
34' - 2"
7' - 10"
SITE DEMO GENERAL NOTES
1. IT IS THE CONTRACTORS RESPONSIBILITY TO PROTECT ALL (E) MATERIALS AND FINISHES TO
REMAIN FROM DAMAGE DURING THE DEMO WORK. WHERE DEMOLITION WORK HAS OCCURRED
AND DAMAGED HAS RESULTED, THE CONTRACTOR SHALL REPLACE DAMAGED MATERIALS AND
FINISHES WITH NEW SIMILAR MATERIALS.
2. REMOVE ALL OBSOLETE EQUIPMENT, PANELS, CONDUIT AND PIPING. ALL UTILITIES SHALL BE
REMOVED TO AS FAR BACK TO THEIR ORIGIN AS POSSIBLE. ALL UTILITIES SHALL BE PROPERLY
CAPPED AT THEIR TERMINATION.
3. WHERE EXISTING WALL FRAMING OR PARTITIONS ARE SHOWN TO BE REMOVED, CONTRACTOR
TO REMOVE/CAP ALL CONCEALED UTILITIES IN PREPARATION OF NEW CONSTRUCTION.
4. REFER TO HAZMAT REPORT FOR LOCATIONS REQUIRING ABATEMENT AND REMOVAL. IF
CONTRACTOR ENCOUNTERS MATERIAL IN AN AREA BEYOND THE SAMPLE AREAS THAT IS
DIFFERENT THAN MATERIAL FOUND IN THE SURVEY, NOTIFY ARCHITECT, OWNER, AND
HAZARDOUS MATERIAL CONSULTANT IMMEDIATELY FOR CONSULTATION PRIOR TO REMOVAL.
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
6. FOR WORK IN THE PUBLIC RIGHT OF WAY, INCLUDING BUT NOT LIMITED TO CURB, GUTTER,
SIDEWALK, AND DRIVEWAY, CONTRACTOR SHALL MANAGE THE PROCESS FOR AN
ENCROACHMENT PERMIT, INCLUDING BUT NOT LIMITED TO PERMITTING AND TRAFFIC CONTROL.
DEMO PLAN LEGENDKEYNOTES
EXISTING CONSTRUCTION TO BE DEMOLISHED
EXISTING CONCRETE PAVING/PATHWAY TO BE DEMOLISHED
PROPERTY LINE
02-0102-01
02-44
02-36
02-33
4' 0' 4' 8'12'
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
1
:
0
7
P
M
D0.00
DEMO SITE PLAN
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
3/16" = 1'-0"D0.00
1 SITE - EXISTING & DEMO
02-01 DEMO (E) NON-ORIGINAL CARPORT STRUCTURE AND SLAB
02-31 DEMO (E) CONCRETE DRIVEWAY
02-32 DEMO (E) DRIVE APPROACH, NEW APPROACH TO BE WIDENED, REFER TO CIVIL DWGS.
02-33 DEMO (E) CONCRETE PATH; DOCUMENT AND MARK DIMENSIONS AND CURVES FOR RECREATION
AND REPLACEMENT OF (E) CONCRETE PATH PRIOR TO DEMO
02-34 DEMO (E) CONCRETE PAVING
02-35 (E) TREE AND ROOTS TO REMAIN, PROTECT IN PLACE; PROVIDE TREE PROTECTION FENCING AND
CARE PER SPECIFICATIONS
02-36 DEMO (E) FENCEING ON ALL SIDES OF THE PROPERTY
02-37 DEMO (E) VEHICULAR GATE
02-38 DEMO (E) PEDESTRIAN GATE AND SUPPORTS
02-39 DEMO (E) SIDEWALK TO THE PROPERTY LINES, REFER TO CIVIL DWGS.
02-40 (E) STREET LIGHT TO REMAIN
02-41 (E) POWER POLE TO REMAIN
02-42 WATER SERVICE AND METER, REFER TO CIVIL DWGS.
02-43 DEMO (E) ABANDONED GAS METER
02-44 REMOVE (E) TREE STUMPS
02-51 SAWCUT, REFER TO CIVIL DRAWINGS
02-52 REMOVE (E) CURB AND GUTTER, REFER TO CIVIL DRAWINGS
02-53 CLEAR AND GRUB (E) LANDSCAPE
02-54 REMOVE (E) HOSE BIB, REMOVE PIPING AS FAR BACK TO ITS ORIGIN AS POSSIBLE & PROPERLY
CAP PIPING TERMINATION
3" = 1'-0"D0.00
2 (E) CARPORT
3" = 1'-0"D0.00
3 (E) NORTH SIDE YARD
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
1
2
3
A B C D E F
02-02
TYP.
02-01
TYP.
02-04
TYP.
02-04
TYP.
02-04
TYP.
02-04
02-21
02-21
02-2102-21
TYP.
02-05
02-07 02-07 02-07 02-07 02-07
02-07
02-0702-07
02-0702-0702-0702-0702-0702-49
02-10 02-10 02-09
02-10
02-12
02-11
02-10
02-10
02-08 02-08 02-08 02-08
02-09
02-06
02-06
8"
15
'
-
8
"
25
'
-
0
"
1'
-
3
"
42
'
-
7
"
72' - 5"18' - 10"34' - 0"
3'
-
1
0
1
/
2
"
26
'
-
6
"
14
'
-
9
"
1"7' - 1"18' - 0"22' - 6"23' - 7"18' - 6"35' - 1 1/2"
2
D1.00
02-2002-23
02-24
02-22
3
D1.00
3
D1.00
10
'
-
0
"
02
-27
A2.001
A2.00 3
A2.01
1
02-46
02-46
TYP.
02-05
TYP.
02-05
.02-45
4
D1.00
5
D1.00
6
D1.00
2 3 4 5 6 7 8 9 10 11 12 13
14 15
16
17192122232425
1
09 08
04
01
02
03
06
07
TYP.
02-05
02-50
DEMO PLAN GENERAL NOTES
1. IT IS THE CONTRACTORS RESPONSIBILITY TO PROTECT ALL (E) MATERIALS AND FINISHES TO
REMAIN FROM DAMAGE DURING THE DEMO WORK. WHERE DEMOLITION WORK HAS OCCURRED
AND DAMAGED HAS RESULTED, THE CONTRACTOR SHALL REPLACE DAMAGED MATERIALS AND
FINISHES WITH NEW SIMILAR MATERIALS.
2. REMOVE ALL OBSOLETE EQUIPMENT, PANELS, CONDUIT AND PIPING. ALL UTILITIES SHALL BE
REMOVED TO AS FAR BACK TO THEIR ORIGIN AS POSSIBLE. ALL UTILITIES SHALL BE PROPERLY
CAPPED AT THEIR TERMINATION.
3. WHERE EXISTING WALL FRAMING OR PARTITIONS ARE SHOWN TO BE REMOVED, CONTRACTOR
TO REMOVE/CAP ALL CONCEALED UTILITIES IN PREPARATION OF NEW CONSTRUCTION.
4. REFER TO HAZMAT REPORT FOR LOCATIONS REQUIRING ABATEMENT AND REMOVAL. IF
CONTRACTOR ENCOUNTERS MATERIAL IN AN AREA BEYOND THE SAMPLE AREAS THAT IS
DIFFERENT THAN MATERIAL FOUND IN THE SURVEY, NOTIFY ARCHITECT, OWNER, AND
HAZARDOUS MATERIAL CONSULTANT IMMEDIATELY FOR CONSULTATION PRIOR TO REMOVAL.
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
6. ALL DOORS AND WINDOWS PLACEMENT IS SHOWN PER THE ORIGINAL DRAWINGS AND HAVE
NOT BEEN VERIFIED FOR AS-BUILT LOCATIONS DUE TO THE SECURITY MEASURES IN PLACE ON
THE EXTERIOR OF THE BUILDING.
7. DOORS HAVE BEEN REMOVED AND SOME WINDOW CASING REMAINS IN SOME OF THE
WINDOWS. COMPLETE INTACT WINDOWS HAVE NOT BEEN VERIFIED DUE TO SECURITY
MEASURES IN PLACE ON SITE.
8. WHERE DOORS AND WINDOWS ARE NO LONGER IN PLACE, NEW WOOD DOOR AND WINDOWS
ARE TO BE INSTALLED TO MATCH ORIGINAL DRAWINGS.
DEMO PLAN LEGENDKEYNOTES
EXISTING CONSTRUCTION TO BE DEMOLISHED
EXISTING STUD WALL TO REMAIN
EXISTING SLAB TO BE DEMOLISHED
PROPERTY LINE
xx
00
WINDOW TAG, REFER TO SHEET A6.00 FOR WINDOW SCHEDULE
DOOR TAG, REFER TO SHEET A6.00 FOR DOOR SCHEDULE
DEMO ORIGINAL
GENERATOR
CONCRETE CURB
DEMO (E) COLUMNS
REMOVE OBSOLETE
PLUMBING LINES
REMOVE OBSOLETE
PLUMBING LINES
REMOVE OBSOLETE
PLUMBING LINE
AREA OF CONCRETE
TO BE DEMO'D;
REFER TO PLAN
REMOVE OBSOLETE
PLUMBING LINE
AREA OF ORIGINAL
FIREPLACE, (E) FRAMING TO
BE MODIFIED; REFER TO
STRUCTURAL DWGS.
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
1
:
1
2
P
M
D1.00
DEMO FLOOR
PLAN
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
1/4" = 1'-0"D1.00
1 FLOOR PLAN - DEMO 0'8'4'4'
02-01 DEMO (E) NON-ORIGINAL CARPORT STRUCTURE AND SLAB
02-02 DEMO ORIGINAL GENERATOR CONCRETE CURB
02-04 (E) SCORED SLAB TO REMAIN; CLEAN, PATCH AND REPAIR TOPPING SLAB AS REQUIRED FOR
SMOOTH FLOOR SURFACE, ASSUME 10% OF SLAB WILL NEED TO BE PATCHED; REFER TO FINISH
PLAN FOR SCORED PATTERN
02-05 DEMO PORTION OF (E) CONCRETE SLAB; COORDINATE EXTENT OF DEMO WITH NEW PLUMBING
LINE LOCATIONS, STRUCTURAL FOOTING WORK AND/OR DEPRESSED SLABS
02-06 DEMO INFILL AT ORIGINAL OPENINGS
02-07 (E) WINDOW TO BE RESTORED, PROTECT AS REQUIRED; REFER TO A6.00 WINDOW SCHEDULE AND
A6.01 WINDOW INVENTORY FOR ADDITIONAL DIRECTION
02-08 (E) WINDOW TO BE REMOVED, SALVAGED AND REPOSITIONED, REFER TO THE ELEVATIONS AND
WINDOW SCHEDULE FOR LOCATION; REFER TO A6.00 WINDOW SCHEDULE AND A6.01 WINDOW
INVENTORY FOR ADDITIONAL DIRECTION
02-09 (E) WINDOW TO BE REMOVE AND SALVAGED FOR REINSTALLATION AT REAR ELEVATION, REFER
TO THE ELEVATIONS AND WINDOW SCHEDULE FOR LOCATION; REFER TO A6.00 WINDOW
SCHEDULE AND A6.01 WINDOW INVENTORY FOR ADDITIONAL DIRECTION
02-10 (E) DOOR OPENING TO REMAIN, REFER TO A1.00 FOR NEW DOOR OR WINDOW REPLACEMENT
02-11 (E) NON-HISTORIC DOOR OPENING IN ORIGINAL WINDOW OPENING TO BE INFILLED
02-12 DEMO PORTION OF WALL FOR RELOCATED SALVAGED WINDOWS
02-20 (E) ORIGINAL WINDOW OPENING FRAMING TO REMAIN FOR RELOCATED WINDOW, ORIGINAL
WINDOW MISSING
02-21 DEMO PORTION OF (E) CONCRETE SLAB AS REQUIRED FOR NEW STRUCTURAL FOOTING WORK
02-22 DEMO PORTION OF (E) CONCRETE SLAB REQUIRED TO REMOVE OBSOLETE PLUMBING LINES
02-23 DEMO OBSOLETE PLUMBING LINES WITHIN WALL CAVITY
02-24 DEMO (E) NON-STRUCTURAL METAL COLUMNS
02-27 ORIGINAL WOOD ARCHED WINDOW AND DOOR DAMAGED BEYOND REPAIR, REMOVE MATERIAL
AND SALVAGE FOR REFERENCE; REBUILD NEW TO MATCH ORIGINAL
02-45 AREA OF ORIGINAL FIREPLACE, (E) FRAMING TO BE MODIFIED; REFER TO STRUCUTRAL DWGS.
12" = 1'-0"D1.00
2 (E) GENERATOR CURB
12" = 1'-0"D1.00
3 (E) PLUMBING AND COLUMNS
12" = 1'-0"D1.00
4 (E) PLUMBING DEMO
12" = 1'-0"D1.00
5 (E) PLUMBING DEMO
12" = 1'-0"D1.00
6 ORIGINAL FIREPLACE FRAMING
02-46 DEMO (E) OBSOLETE PLUMBING LINES IN THE (E) SLAB AND PROPERTLY CAPPED LINES AT THEIR
TERMINATION; DEMO (E) CONCRETE SLAB AS REQUIRED FOR THIS WORK.
02-49 (E) WINDOW DAMAGED BEYOND REPAIR, REMOVE AND SALVAGE MATERIAL WHERE POSSIBLE;
REFER TO A6.00 WINDOW SCHEDULE AND A6.01 WINDOW INVENTORY FOR ADDITIONAL DIRECTION.
02-50 DEMO WINDOW, SALVAGE FOR PARTS
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
ROOF GENERAL NOTES
1. IT IS THE CONTRACTORS RESPONSIBILITY TO PROTECT ALL (E) MATERIALS AND FINISHES TO
REMAIN FROM DAMAGE DURING THE DEMO WORK. WHERE DEMOLITION WORK HAS OCCURRED
AND DAMAGED HAS RESULTED, THE CONTRACTOR SHALL REPLACE DAMAGED MATERIALS AND
FINISHES WITH NEW SIMILAR MATERIALS.
2. REMOVE ALL OBSOLETE EQUIPMENT, PANELS, CONDUIT AND PIPING. ALL UTILITIES SHALL BE
REMOVED TO AS FAR BACK TO THEIR ORIGIN AS POSSIBLE. ALL UTILITIES SHALL BE PROPERLY
CAPPED AT THEIR TERMINATION.
3. WHERE EXISTING WALL FRAMING OR PARTITIONS ARE SHOWN TO BE REMOVED, CONTRACTOR
TO REMOVE/CAP ALL CONCEALED UTILITIES IN PREPARATION OF NEW CONSTRUCTION.
4. REFER TO HAZMAT REPORT FOR LOCATIONS REQUIRING ABATEMENT AND REMOVAL. IF
CONTRACTOR ENCOUNTERS MATERIAL IN AN AREA BEYOND THE SAMPLE AREAS THAT IS
DIFFERENT THAN MATERIAL FOUND IN THE SURVEY, NOTIFY ARCHITECT, OWNER, AND
HAZARDOUS MATERIAL CONSULTANT IMMEDIATELY FOR CONSULTATION PRIOR TO REMOVAL
5. WHERE ORIGINAL MATERIALS REMAIN AND ARE SALVAGEABLE, ORIGINAL MATERIALS SHALL BE
REPAIRED AS NEEDED. IF DETERIORATION IS BEYOND REPAIR OR ORIGINAL BUILDING FEATURES
ARE MISSING, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION.
DEMO ROOF PLAN LEGENDKEYNOTES
DEMO (E) BUILDING
DEMO (E) BUILT-UP ROOFING SYSTEM, REFER TO KEYNOTES FOR ADDITIONAL
INFORMATION
ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED,
REFER TO KEYNOTES FOR ADDITIONAL INFORMATION
(E) ROOF OPENING, REFER TO STRUCTURAL DRAWINGS FOR PATCH AND
REPAIR
1
2
3
A B C D E F
TYP.
02-01TYP.
02-13
TYP.
02-17
TYP.
02-17
TYP.
02-17 02-2502-25
02-26
02-16
02-26
TYP.
02-15
TYP.
02-15
TYP.
02-14
TYP.
02-14
02-19
02-19
2'
-
1
"
15
'
-
8
"
1'
-
6
"
23
'
-
6
"
1'
-
3
"
24
'
-
9
"
19
'
-
3
"
19' - 3"54' - 7"18' - 10"34' - 0"
3'
-
1
0
1
/
2
"
26
'
-
6
"
14
'
-
9
"
7"7' - 1"18' - 0"22' - 6"23' - 7"18' - 6"7"
18' - 11"71' - 11"34' - 6 1/2"
RI
D
G
E
LEVEL LEVEL
LE
V
E
L
DO
W
N
DO
W
N
DOWNDOWN DOWN
DOWN
02-48
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
JD/AP
As indicated
4/
7
/
2
0
2
5
9
:
2
1
:
1
5
P
M
D1.10
DEMO ROOF PLAN
23004
CYPRESS CENTER
RESTORATION
CITY OF SANTA ANA
1/17/2025
625 S. CYPRESS AVE.
SANTA ANA, CA 92701
0'8'4'4'
1/4" = 1'-0"D1.10
1 ROOF - DEMO
02-01 DEMO (E) NON-ORIGINAL CARPORT STRUCTURE AND SLAB
02-13 DEMO (E) BUILT-UP ROOFING SYSTEM DOWN TO SHEATHING AND REMOVE ALL ASSOCIATED
FLASHING, PROTECT (E) SHEATHING IN PLACE; REFER TO A1.10 FOR ADDITIONAL SCOPE
02-14 ORIGINAL CLAY TILE ROOF TO BE SALVAGED, CLEANED AND RESTORED; PROTECT (E) SHEATHING
IN PLACE; REFER TO A1.10 FOR ADDITIONAL SCOPE
02-15 ORIGINAL GUTTER TO BE SALVAGED, CLEANED AND RESTORED, GUTTER TO BE FREE OF DEBRIS
AND ORGANIC MATERIAL; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL
MATCH ORIGINALS AS CLOSE AS POSSIBLE AND MEET THE SECRETARY OF THE INTERIOR'S
STANDARDS FOR REHABILITATION
02-16 (E) CONDUCTOR HEAD AND DOWNSPOUT TO BE SALVAGED, CLEANED AND RESTORED; IF
DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS
POSSIBLE
02-17 DEMO (E) PARAPET CAP
02-19 DEMO (E) ROOF DRAIN AND ASSOCIATED PLUMBING LINES
02-25 (E) UPPER DOWNSPOUT AND OVERFLOW SUPPER TO BE REMOVED; LOWER DOWNSPOUT AND
CONDUCTOR HEAD ARE MISSING; ALL NEW MATERIALS SHALL MATCH ORIGINALS AS CLOSE AS
POSSIBLE
02-26 (E) UPPER DOWNSPOUT AND CONDUCTOR HEAD TO BE SALVAGED, CLEANED AND RESTORED;
LOWER DOWNSPOUT IS MISSING; IF DETERIORATION IS BEYOND REPAIR, ALL NEW MATERIALS
SHALL MATCH ORIGINALS AS CLOSE AS POSSIBLE
02-48 DEMO AREA OF (E) ROOF FOR NEW ROOF ACCESS HATCH; REFER TO STRUCTURAL DRAWINGS
FOR FRAMING MODIFICATIONS
12" = 1'-0"D1.10
2 (E) ROOF CONDITIONS
No. Description Date
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
OCFA SUBMITTAL 9/26/2024
BACKCHECK SET 1/17/2024
BACKCHECK SET_V2 4/8/2025
OUTSIDE DIAMETER
PRESSURE TREATED
SEE MECHANICAL DRAWINGS
SEE CIVIL DRAWINGS
SEE ARCHITECTURAL DRAWINGS
TONGUE AND GROOVE
TOP OF CONCRETE
UNLESS OTHERWISE NOTED
TOP OF SLAB/STEEL
THRU THROUGH
FLOORFLR.
HDR.
INT.
HT.
I.D.
IN.
HORIZ.
GALV.
G.L.
GLB
HD
FTG.
FT.
GA.
F.N.
HEADER
INSIDE DIAMETER
INTERIOR
HEIGHT
HORIZONTAL
INCH
GLUED LAMINATED BEAM
GALVANIZED
GRID LINE
HOLDOWN
FOOTING
FIELD NAILING
FEET
GAUGE
V.I.F. VERIFY IN FIELD
WITHOUT
WOOD
WEIGHT
WORKING POINT
WITH
WT.
W/O
W.P.
W/
WD.
TYPICAL
TOP OF
VERTICAL
U.O.N
VERT.
TYP.
T.O.S.
T.O.C
T.O.
DIAPH.
E/S
EXT.
FIN.
FDN.
E/W
EMB.
EQUIV.
E.N.
EQ.
(E)
E/F
E/E
EL.
EA.
DWG.
DN.
DIM.
COL.
CONT.
DBL.
DET.
DIA. Ø
CONN.
COND.
CONC.
COMP.
BTWN.
CLR.
CNTR.
CMU
C.F.
BOT.
B.O.
B.N.
S.M.D
DIAPHRAGM
EACH SIDE
EXTERIOR
FOUNDATION
EACH WAY
FINISH
EMBEDMENT
EQUIVALENT
EDGE NAILING
EQUAL
EXISTING
EACH FACE
EACH END
ELEVATION
EACH
DRAWING
DIMENSION
DOWN
STEEL
STANDARD
STIFFENER
THICK
TOP AND BOTTOM
SYMMETRIC
SHEAR WALL
THREADED
SYM.
THR'D.
THK.
T&B
T&G
STIFF.
STL.
S.W.
STD.
SHEATHING
SLAB ON GRADE
SHEET
SIMPSON
SCHEDULE
SIMILAR
SPECIFICATIONS
STAGGERED
S.O.G.
SPEC.
STAG.
SIM.
SHTG.
SCH.
SIMP.
SHT.
COLUMN
CONTINUOUS
DOUBLE
DIAMETER
DETAIL
CONNECTION
CONDITION
CONCRETE
COMPACTED
CONCRETE MASONRY UNIT
BOUNDARY NAILING
BETWEEN
CENTER
CUBIC FEET
CLEAR
BOTTOM
BOTTOM OF
PERP. PERPENDICULAR
PLYWOOD
REINFORCING
REQUIRED
REVISION
REFERENCE
REQ'D
S.A.D.
S.C.D.
REV.
PLYWD.
REINF.
P.T.
REF.
METAL
ON CENTER
OPPOSITE
OPENING
NEW
NOT IN CONTRACT
NOT TO SCALE
PARALLEL
O.C.
OPNG.
OPP.
PAR.
O.D.
N.I.C.
N.T.S
MTL.
(N)
(A)
ARCH.
BM.
BLKG.
BLDG.
(B)
APPROX.
A.B.
ADJ.
ADD'L
ABOVE
ARCHITECT
BLOCKING
BUILDING
BEAM
BELOW
APPROXIMATE
ADJACENT
ANCHOR BOLT
ADDITIONAL
LB POUND
LEVEL
LONGITUDINAL
LAG SCREW
MINIMUM
MECHANICAL
MAXIMUM
MACHINE BOLT
MISCELLANEOUS
MAX.
MECH.
MISC.
MIN.
M.B.
L.S.
LONG.
LV.
COLL.COLLECTOR
P/T POST TENSIONED
MICROLLAMML.
PSL PARALLEL STRAND LUMBERCNTRSNK.COUNTER SUNK
NORMAL WEIGHTN.W.
SQUARESQ.
TUBE STEELTS
RELATIVE COMPACTIONR.C.
C.J.CONSTRUCTION JOINT
C.I.P.CAST IN PLACE
HSS HOLLOW STRUCTURAL STEEL
LIGHT WEIGHTL.W.A.F.F.ARCHITECTURAL FINISHED FLOOR
TRANSVERSETRNSV.
PLATE
CENTERLINECL
PL
LONG LEG VERTICALLLV
A.T.R.ALL THREAD ROD
F.S.FAR SIDE
H.D.G.HOT DIP GALVANIZED
V.W.A. VERIFY WITH ARCHITECT
NEAR SIDEN.S.
LAMINATED VENEER LUMBERLVL
SEE LANDSCAPE DRAWINGSS.L.D.
N
DET. NO/SHT. NO.
1
COL. S
I
Z
E
A A
DWG.
SHEET
DWG.
SHEET
DWG.
SHEET
GRID LINE KEYNOTE TAG MATCHLINE
ELEVATION REVISIONS COLUMN TAG NORTH ARROW
SECTION SECTION DETAIL ELEVATION
X
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
2/
2
5
/
2
0
2
5
1
:
5
5
:
4
7
P
M
S0.00
COVER SHEET
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
SHEET LIST
SHEET NUMBER SHEET NAME
S0.00 COVER SHEET
S0.01 GENERAL NOTES
S0.02 GENERAL NOTES
S0.04 SPECIAL INSPECTIONS & TESTING
S0.11 LOADING PLANS
S0.21 TYPICAL CONCRETE DETAILS
S0.22 TYPICAL FOUNDATION DETAILS
S0.23 TYPICAL WOOD DETAILS
S0.24 TYPICAL WOOD DETAILS
S0.31 TYPICAL WSWH DETAILS
S1.01 FOUNDATION & FIRST FLOOR FRAMING PLAN
S1.02 ROOF FRAMING PLAN
S2.01 FOUNDATION & FIRST FLOOR DETAILS
S2.02 FRAMING DETAILS
S0.00 N.T.S.
1 ABBREVIATIONS
S0.00 1/4" = 1'-0"
2 GENERAL SYMBOLS
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
2/
2
5
/
2
0
2
5
1
:
5
5
:
5
0
P
M
S0.01
GENERAL NOTES
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
2/
2
5
/
2
0
2
5
1
:
5
5
:
5
2
P
M
S0.02
GENERAL NOTES
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
STATEMENT OF SPECIAL INSPECTIONS
1. SPECIAL INSPECTIONS AND TESTS SHALL BE PERFORMED BY AN INDEPENDENT QUALIFIED INSPECTION AND/OR TESTING AGENCY
APPROVED BY THE JURISDICTION FOR SUCH WORK,AND IN ACCORDANCE WITH CHAPTER 17 OF THE CODE. THESE SPECIAL
INSPECTIONS AND TESTS ARE IN ADDITION TO THE INSPECTIONS PERFORMED BY THE BUILDING OFFICIAL.
2. THE OWNER SHALL BE RESPONSIBLE FOR RETAINING THE SPECIAL INSPECTION AND/OR TESTING AGENCY.
3. THE SPECIAL INSPECTION AND/OR TESTING AGENCY SHALL KEEP RECORDS AND SUBMIT SPECIAL INSPECTION AND TEST REPORTS
TO THE BUILDING OFFICIAL AND THE STRUCTURAL ENGINEER OF RECORD IN ACCORDANCE WITH SECTIONS 1704.2.4 AND 1704.5 OF
THE CODE AND JURISDICTION-SPECIFIC REQUIREMENTS.
4. THE CONTRACTOR SHALL NOTIFY THE TESTING LAB A MINIMUM OF 48 HOURS PRIOR TO TIME OF INSPECTION.
5. THE CONSTRUCTION OR WORK FOR WHICH SPECIAL INSPECTION OR TESTING IS REQUIRED SHALL REMAIN ACCESSIBLE AND
EXPOSED FOR SPECIAL INSPECTION OR TESTING PURPOSES UNTIL COMPLETION OF THE REQUIRED SPECIAL INSPECTIONS OR
TESTS. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 3 DAYS NOTICE TO THE APPROVED TESTING AGENCY PRIOR TO ANY REQUIRED
INSPECTIONS.
6. IF INITIAL TESTS OR INSPECTIONS MADE BY THE OWNER'S TESTING OR INSPECTION AGENCY REVEAL THAT ANY PORTION OF THE
WORK DOES NOT COMPLY WITH THE CONTRACT DOCUMENTS, ADDITIONAL TESTS, INSPECTIONS, AND NECESSARY REPAIRS OR
CORRECTIONS SHALL BE MADE AT THE CONTRACTOR'S EXPENSE. CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER IMMEDIATELY
OF NON-CONFORMING WORK. THIS NOTIFICATION SHALL SPECIFICALLY ADDRESS THE NON-CONFORMING WORK AND SHALL BE
SEPARATE AND IN ADDITION TO THE SPECIAL INSPECTION REPORTS.
7. SPECIAL INSPECTION REPORTS SHALL BE SENT TO THE ENGINEER AT THE TIME OF COMPLETION FOR REVIEW OF CONFORMANCE WITH
THE REQUIREMENTS OF THE STRUCTURAL DRAWINGS. AND SPECIFICALLY BRING ANY NON-CONFORMING ITEMS TO THE ATTENTION OF
THE REVIEWER
8. SPECIAL INSPECTIONS AND TESTS FOR SEISMIC RESISTANCE SHALL BE PERFORMED FOR THE DESIGNATED SEISMIC SYSTEM/SEISMIC
FORCE RESISTING COMPONENT WHEN APPLICABLE AND AS PER SECTIONS 1705.12 & 1705.13 OF THE CODE.
a. DESIGNATED SEISMIC SYSTEM/SEISMIC FORCE RESISTING SYSTEM: WOOD FRAMED DIAPHRAGM & SHEAR WALLS.
SEE THE ABOVE-REFERENCED CODE SECTIONS FOR ADDITIONAL SPECIAL INSPECTION AND TEST REQUIREMENTS FOR
STRUCTURAL STEEL, STRUCTURAL WOOD, COLD-FORMED STEEL LIGHT-FRAME CONSTRUCTION, DESIGNATED SEISMIC SYSTEMS,
ARCHITECTURAL COMPONENTS, MEP COMPONENTS, STORAGE RACKS, SEISMIC ISOLATIONS SYSTEMS, AND COLD-FORMED
STEEL SPECIAL BOLTED MOMENT FRAMES.
9. SPECIAL INSPECTIONS FOR WIND RESISTANCE SHALL BE PERFORMED FOR THE MAIN WIND FORCE RESISTING SYSTEM AND WIND
RESISTING COMPONENTS WHEN APPLICABLE AND AS PER SECTION 1705.11 OF THE CODE.
a. MAIN WIND FORCE RESISTING SYSTEM/WIND RESISTING COMPONENT: WOOD FRAMED DIAPHRAGM & SHEAR WALLS.
SEE THE ABOVE-REFERENCED CODE SECTIONS FOR ADDITIONAL SPECIAL INSPECTION REQUIREMENTS FOR
STRUCTURAL WOOD, COLD-FORMED STEEL LIGHT-FRAME CONSTRUCTION, AND WIND-RESISTING COMPONENTS.
10. EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND OR SEISMIC FORCE RESISTING SYSTEM, DESIGNATED
SEISMIC SYSTEM, OR A WIND OR SEISMIC RESISTING COMPONENT LISTED ABOVE SHALL SUBMIT A WRITTEN STATEMENT OF
RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR
COMPONENT. THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGMENT OF AWARENESS OF THE
SPECIAL REQUIREMENTS CONTAINED IN THIS STATEMENT OF SPECIAL INSPECTIONS.
11. STEEL CONSTRUCTION: SPECIAL INSPECTIONS FOR STEEL ELEMENTS OF BUILDINGS AND STRUCTURES SHALL BE AS REQUIRED BY
SECTION 1705.2 OF THE CODE AND IN ACCORDANCE WITH THE QUALITY ASSURANCE INSPECTION REQUIREMENTS OF AISC 360,
INCLUDING THE SPECIAL INSPECTION TABLE SHOWN HEREIN. SEE ADDITIONAL REQUIREMENTS NOTED FOR SEISMIC AND WIND
RESISTANCE OF INSPECTION NOTES #8 AND #9.
12. CONCRETE CONSTRUCTION: SPECIAL INSPECTIONS AND VERIFICATIONS FOR CONCRETE CONSTRUCTION SHALL BE AS REQUIRED
BY SECTION 1705.3 OF THE CODE, INCLUDING THE SPECIAL INSPECTION TABLE SHOWN HEREIN.
CONCRETE SPECIAL INSPECTIONS AND TESTS ARE NOT REQUIRED FOR:
a. ISOLATED SPREAD FOOTINGS OF BUILDINGS 3 STORIES OR LESS ABOVE GRADE PLANE THAT ARE FULLY SUPPORTED ON
EARTH OR ROCK.
b. NONSTRUCTURAL CONCRETE SLABS SUPPORTED DIRECTLY ON THE GROUND, INCLUDING PRESTRESSED SLABS ON GRADE
WHERE THE EFFECTIVE PRESTRESS IN THE CONCRETE IS LESS THAN 150 PSI.
c. CONCRETE PATIOS, DRIVEWAYS AND SIDEWALKS, ON GRADE.
13. MASONRY CONSTRUCTION: SPECIAL INSPECTIONS AND VERIFICATIONS FOR MASONRY CONSTRUCTION SHALL BE AS REQUIRED BY
SECTION 1705.4 OF THE CODE AND IN ACCORDANCE WITH TMS 402/ACI 530/ASCE 5 AND TMS 602/ACI 530.1/ASCE 6 QUALITY
ASSURANCE REQUIREMENTS, INCLUDING THE SPECIAL INSPECTION TABLES SHOWN HEREIN.
14. WOOD CONSTRUCTION: SPECIAL INSPECTIONS FOR WOOD CONSTRUCTION SHALL BE AS REQUIRED BY SECTION 1705.5 OF
THE CODE. SEE ALSO REQUIREMENTS NOTED FOR SEISMIC AND WIND RESISTANCE OF INSPECTION NOTES #8 AND #9.
15. SOILS: SPECIAL INSPECTIONS FOR EXISTING SOIL CONDITIONS, FILL PLACEMENT, AND LOAD BEARING REQUIREMENTS SHALL BE
AS REQUIRED BY SECTIONS 1705.6 THROUGH 1705.9 OF THE CODE, INCLUDING THE SPECIAL INSPECTION TABLES SHOWN HEREIN.
16. DEEP FOUNDATIONS: SPECIAL INSPECTIONS FOR DRIVEN AND CAST-IN-PLACE DEEP FOUNDATIONS SHALL BE AS REQUIRED BY SECTIONS
1705.7 AND 1705.8 OF THE CODE RESPECTIVELY, INCLUDING THE TESTS AND INSPECTIONS CONTAINED WITHIN THE APPROVED
GEOTECHNICAL REPORT, AND INCLUDING THE SPECIAL INSPECTION TABLES SHOWN HEREIN.
1. INSPECT REINFORCEMENT, INCLUDING
PRESTRESSING TENDONS, AND PLACEMENT.
2. INSPECT ANCHORS CAST IN CONCRETE.
3. INSPECTION OF ANCHORS
POST-INSTALLED IN HARDENED
CONCRETE MEMBERS.b
a. MECHANICAL ANCHORS AND
ADHESIVE ANCHORS
4. VERIFY USE OF REQUIRED MIX DESIGN.
5. PRIOR TO CONCRETE PLACEMENT,
FABRICATE SPECIMENS FOR
STRENGTH TESTS, PERFORM SLUMP
AND AIR CONTENT TESTS, AND
DETERMINE THE TEMPERATURE OF
THE CONCRETE.
6.. INSPECT FORMWORK FOR SHAPE
LOCATION, AND DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED.
a. WHERE APPLICABLE, SEE ALSO SECTION 1705.12 (SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE).
b. SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH REPORT FOR THE ANCHOR
ISSUED BY AN APPROVED SOURCE IN ACCORDANCE WITH ACI 318-19 SECTION 17.8.2, OR OTHER QUALIFICATION
PROCEDURES. WHERE SPECIFIC REQUIREMENTS ARE NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE
SPECIFIED BY THE REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL PRIOR TO
THE COMMENCEMENT OF THE WORK.
REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION
(CBC TABLE 1705.3)
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCED STANDARD CBC REFERENCE
-
-
-
-
X
-
X
-
X
X
X
-
X
ACI 318: CH. 20, 25.2,
25.3, 26.6.1-26.6.3
ACI 318: 17.8.2, 26.13.3
ACI 318: 17.8.2
ACI 318: CH.19, 26.4.3,
26.4.4
ASTM C172, ASTM C31,
ACI 318: 26.5, 26.12
ACI 318: 26.11.1.2(b)
1908.4
-
-
-
1904.1, 1904.2,
1908.2, 1908.3
1908.10
-
a
1. STRUCTURAL WOOD SPECIAL INSPECTIONS FOR SEISMIC
RESISTANCE:
a. INSPECTION OF FIELD GLUING OPERATIONS OF
ELEMENTS OF THE SEISMIC-FORCE RESISTING SYSTEM.
b. INSPECTION OF NAILING, BOLTING, ANCHORING AND
OTHER FASTENING OF COMPONENTS WITHIN THE
SEISMIC-FORCE RESISTING SYSTEM, INCLUDING WOOD
SHEAR WALLS*, WOOD SHEAR PANELS*, WOOD
DIAPHRAGMS*, DRAG STRUTS, BRACES, AND HOLD-DOWNS.
REQUIRED VERIFICATION AND INSPECTION FOR SEISMIC RESISTANCE (CBC SECTION 1705.12)
VERIFICATION AND INSPECTION CONTINUOUS REFERENCED STANDARD
X
-
-
X
CBC SEC. 1705.12.2
* SPECIAL INSPECTIONS
NOT REQUIRED WHERE
FASTENER SPACING OF
SHEATHING IS MORE THAN
4" O.C.
PERIODIC
2. REINFORCED CONCRETE SPECIAL INSPECTIONS FOR
SEISMIC RESISTANCE
a. PLACEMENT OF REINFORCING STEEL
CBS SEC. 1705.12
ACI 318-14, SEC. 26.13
-
b. PLACEMENT OF CONCRETE
X ACI 318-14 SEC. 26.13.3
X - ACI 318-14 SEC. 26.13.3
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
N.T.S.
2/
2
5
/
2
0
2
5
1
:
5
5
:
5
3
P
M
S0.04
SPECIAL
INSPECTIONS &
TESTING
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S0.04 N.T.S.
1 STATEMENT OF SPECIAL INSPECTIONS
S0.04 N.T.S.
2 MINIMUM TEST AND SPECIAL INSPECTIONS OF
CONCRETE CONSTRUCTION
S0.04 N.T.S.
3 MINIMUM INSPECTION FOR SEISMIC RESISTANCE
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
1
2
3
A B C D E F
1
2
3
A B C D E F
LEGEND:
TYPICAL ROOF LOADS
SDL = 23 PSF, LL = 20 PSF
BARREL TILE ROOF LOADS
SDL = 31 PSF, LL = 20 PSF
FLOOR LOADS
SDL = 20 PSF, LL = 100 PSF
NOTES:
1. ROOF HAS NOT BEEN DESIGNED FOR ANY NEW MEP LOADS
2. LOADS ARE TOTAL LOADS AND INCLUSIVE OF (E) LOADS
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
1/8" = 1'-0"
2/
2
5
/
2
0
2
5
1
:
5
5
:
5
5
P
M
S0.11
LOADING PLANS
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S0.11 1/8" = 1'-0"
1 FIRST FLOOR LOADING PLAN
S0.11 1/8" = 1'-0"
2 ROOF LOADING PLAN
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
W1895-88-01
2025-01-17
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
A
A
BAR
SIZE
#3
#4
#5
#6
#7
#8
#9
NOTES:
1. ALL UNITS IN INCHES, U.O.N.
2. THIS TABLE CONTAINS MIN. LENGTHS FOR LAP SPLICES & BAR DEVELOPMENT NOT OTHERWISE SPECIFIED ON
THESE DRAWINGS. THESE LENGTHS MAY BE REDUCED IN CERTAIN SITUATIONS, SUBJECT TO PRIOR REVIEW &
APPROVAL OF THE ENGINEER.
3. MULTIPLY Ld AND Ls BY 1.33 FOR LIGHTWEIGHT CONCRETE.
4. MULTIPLY Ld AND Ls BY 1.2 FOR EPOXY-COATED REINFORCEMENT. IF CLEAR COVER IS LESS THAN 3* db OR CLEAR
SPACING IS LESS THAN 6* db MULTIPLY Ld AND Ls BY 1.5 INSTEAD OF 1.2.
5. CLEAR SPACING OF BARS OR WIRES BEING DEVELOPED OR LAP SPLICED SHALL BE AT LEAST 2*db AND CLEAR
COVER SHALL BE AT LEAST db. IF THIS REQUIREMENT IS NOT MET, MULTIPLY Ld AND Ls BY 1.5.
6. MULTIPLY Ld AND Ls BY 1.3 IF MORE THAN 12" OF FRESH CONCRETE IS PLACED BELOW HORIZ. REINFORCEMENT.
7. DO NOT FIELD BEND REINFORCEMENT PARTIALLY EMBEDDED IN CONCRETE.
8. WHEN SPLICING BARS OF DIFFERENT DIAMETERS, Ls SHALL BE THE GREATER OF Ld OF THE LARGER BAR AND Ls OF
THE SMALLER BAR.
Ld
(DEVELOPMENT LENGTH)
17
30
0
0
f'c (psi)
Ls
(LAP SPLICE LENGTH)
GRADE 60 REINFORCING LAP SPLICE /
DEVELOPMENT SCHEDULE
f'c (psi)
15
40
0
0
13
50
0
0
30
0
0
40
0
0
50
0
0
22 19 17
28 24 22
33 29 26
48 42 38
55 48 43
62 54 48
22 19 17
29 25 23
36 31 28
43 37 34
63 54 49
72 62 56
81 70 63
18
25
0
0
24
30
36
53
60
68
24
25
0
0
32
39
47
69
78
88
BAR
SIZE
#3
#4
#5
#6
#7
#8
#9
NOTES:
1. ALL UNITS IN INCHES, U.O.N.
2. THIS TABLE CONTAINS MIN. LENGTHS FOR HOOKED BAR DEVELOPMENT NOT OTHERWISE SPECIFIED ON THESE DRAWINGS.
THESE LENGTHS MAY BE REDUCED IN CERTAIN SITUATIONS, SUBJECT TO PRIOR REVIEW & APPROVAL OF THE ENGINEER.
3. HOOK DEVELOPMENT LENGTHS ARE FOR GRADE 60 REINFORCING.
4. SEE GRADE 80 TABLE FOR GRADE 80 REINFORCING.
5. MULTIPLY Ldh BY 1.33 FOR LIGHTWEIGHT CONCRETE.
6. MULTIPLY Ldh BY 1.2 FOR EPOXY-COATED REINFORCEMENT.
7. S IS THE MINIMUM CENTER-TO-CENTER SPACING OF HOOKED BARS. WHERE HOOK SPACING IS LESS THAN S FOR #11 AND
SMALLER BARS, MULTIPLY Ldh BY 1.6.
8. MULTIPLY Ldh BY 1.25 IF MINIMUM SIDE COVER IS NOT MET FOR #11 AND SMALLER BARS.
9. FOR HOOKS TERMINATING INSIDE COLUMN CORE, MIN SIDE COVER SHALL BE 2 1/2" AND SUPERSEDES THE SIDE COVER
REQUIREMENTS OF THIS TABLE. MULTIPLY Ldh BY 1.25 IF THIS REQUIREMENT IS NOT MET.
10. WHERE HOOKS TERMINATE AT ENDS OF DISCONTINUOUS MEMBERS WITH SIDE AND TOP (OR BOTTOM) COVER LESS THAN 2 1/2",
PROVIDE HOOK CONFINEMENT PER END MEMBER HOOK CONFINEMENT DETAIL.
11. HOOKS SHALL BE AS CLOSE AS PRACTICAL TO THE FAR ENDS OF BEAM-COLUMN JOINTS AND CORBELS.
12. HOOKS SHALL NOT BE USED TO DEVELOP BARS IN COMPRESSION.
E (HOOK EXTENSION)
90
°
B
E
N
D
Ldh (DEVELOPMENT LENGTH)
GRADE 60 REINFORCING
f'c (psi)
MI
N
.
H
O
O
K
E
D
BA
R
S
P
A
C
I
N
G
S
=
6
*
D
B
,
SE
E
N
O
T
E
7
30
0
0
40
0
0
50
0
0
2 1/4
D (I
N
S
I
D
E
BE
N
D
ø
)
6
25
0
0
"S"
CENTER-TO-CENTER
BAR SPACING
"C"
SIDE COVER
EDGE OF CONC.
STD. HOOK
E=
1
2
d
b
VIEW A-A
D =
6db FOR BAR SIZES #3-#8
8db FOR BAR SIZES #9-#11
10db FOR BAR SIZES #14-#18
D =
6db FOR BAR SIZES #3-#8
8db FOR BAR SIZES #9-#11
10db FOR BAR SIZES #14-#18
≥2 1/2"
E=4db
90°
180°
Ldh
2 1/2" ALL
REINF. BAR
REINF. BAR
STANDARD HOOK OPTIONS
18
0
°
B
E
N
D
MI
N
.
H
O
O
K
E
D
BA
R
S
I
D
E
CO
V
E
R
,
C
,
SE
E
N
O
T
E
S
8
&
9
4 1/2 2 1/2 2 1/4 2 1/4
3 6 2 1/2 3 3
3 3/4 7 1/2 2 1/2 3 3/4 3 3/4
4 1/2 9 3 4 1/2 4 1/2
5 1/4 10 1/2 3 1/2 5 1/4 5 1/4
6 12 4 6 6
9 1/4 13 3/4 4 3/4 7 7
6 6 6
6 6 6 6
8 1/2 8 7 1/2 7 1/4
11 10 1/2 9 3/4 9 1/2
13 3/4 13 1/4 12 1/4 12
16 3/4 16 15 14 1/2
20 1/4 19 1/4 18 17 1/2
NON-CONTACT LAP SPLICE
6 MIN.
1
LAP SPLICE OPTIONS
HOOK D, TYP.
NON-CONTACT LAP SPLICE
Ls
LsMAX. SPACING S: MIN. OF 6", Ls/5
WIRE TIES
CONTACT LAP SPLICE
WIRE TIES
CONTACT LAP SPLICE,
OFFSET LAP
LAP SPLICE
COUPLER OR WELDED SPLICE
Ls 2'-0" CLR.Ls
BAR DEVELOPMENT
COUPLER SPLICE
SPLICE AND DEVELOPMENT STAGGER DETAIL
2' - 0" CLR.
HORIZONTAL BAR PLACEMENT LOCATION
DEVELOPMENT LENGTH MODIFIER
Ld
CO
N
C
.
I
S
C
A
S
T
B
E
L
O
W
B
A
R
MU
L
T
I
P
L
Y
L
d
B
Y
1
.
3
IF
M
O
R
E
T
H
A
N
1
2
"
O
F
F
R
E
S
H
HORIZ. BAR BEING
DEVELOPED
CRITICAL SURFACE
WIRE TIES
LAP SPLICE OF DIFFERENT SIZED BARS
AND Ls OF SMALLER BAR
LAP SPLICE LENGTH
MAX. OF Ld OF LARGER BAR
3"
dB MIN.
CLEAR COVER
MINIMUM CLEAR SPACING SHALL BE THE MAX OF:
1", AND 1.33*Dagg, AND 2*db WITHOUT PENALTY
OR
1", 1.33"Dagg, AND db WITH PENALTY
DEVELOPED BAR OR
LAP SPLICE
ADJACENT BAR OR
LAP SPLICE
MIN. BAR CLEAR SPACING OF DEVELOPED
BARS AND CONTACT SPLICES
NOTES:
1. SEE NOTE 6 IN THE SPLICE / DEVELOPMENT SCHEDULE.
2. Dagg IS THE MAXIMUM AGGREGATE SIZE.
3. FOR GRADE 80 REINFORCING, IF CLEAR SPACING IS LESS THAN 6", PROVIDE
CONFINING REINFORCING, SEE NOTE 8 IN THE SPLICE / DEVELOPMENT SCHEDULE
4. BAR COVER REQUIREMENTS MAY BE GREATER.
SMALLERBAR
LARGER BAR
Ld 2'-0" CLR.Ld
MIN. BAR SPACING:
1 1/2" OR 1.5d
WHICHEVER IS
LARGER
MAX. BAR SPACING:
Ls/5 OR 6"
WHICHEVER
IS LESS.
BAR SPACING FOR BARS SPLICED WITH A
NON-CONTACT LAP
BAR SPACING FOR NON-SPLICED BARSA
B
2 1/2" CLR. MIN. @ #5 BARS & SMALLER,
6d CLR. MIN. @ #6 BARS & LARGER
12d MIN. SPACING AT BARS
CLOSEST TO NOZZLE
6d MIN. SPACING AT BARS IN
CURTAIN FURTHEST FROM NOZZLE
3d MIN. SPACING & Ls/5 MAX. SPACING
2" MIN. CLR. BUT NOT GREATER THAN 6"
WHERE d = DIAMETER OF LARGER BAR
DOUBLE CURTAIN SPACING
SINGLE CURTAIN SPACING
BAR SPACING AT NON-LAPPED BARS, U.O.N.
LAPPED BAR SPACING
CL CL
CL CL
CL CL
A
B
IN CONCRETE
IN SHOTCRETE
d
d
d
d
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
2/
2
5
/
2
0
2
5
1
:
5
5
:
5
6
P
M
S0.21
TYPICAL
CONCRETE
DETAILS
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S0.21 N.T.S.
1 GRADE 60 LAP SPLICE / DEVELOPMENT SCHEDULE
S0.21 N.T.S.
2 GRADE 60 HOOKED BAR DEVELOPMENT LENGTH
S0.21 N.T.S.
5 SPLICE / DEVELOPMENT DETAILS
S0.21 1" = 1'-0"
9 BAR SPACING
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
T.O. CONC. SLAB
S.A.D.
T.O. CONC. SLAB
S.A.D.
T.O. SLAB
PER PLAN
STD. BAR OFFSET TO
LONG. BARS AT JOINT
STIRRUPS, TYP.
FTG. REINF.
TOP & BOTTOM
STD. 90°
VERT.
HOOKS
STD. 90° HOOK., TYP.
STIRRUPS, TYP.
FTG. REINF.
TOP & BOTTOM
TYP.
Ls
TYP. Ls
IF D - 2"> Ld.
HOOKS NOT REQ'D, TYP.
D
TO
M
A
T
C
H
(
E
)
S.
O
.
G
.
(
5
"
M
I
N
.
)
(N
)
C
O
N
C
.
S
L
A
B
CHIP (E) S.O.G.
& EXPOSE (E) REINF.
#4 ADHESIVE DOWELS
@ 12" AT EACH EDGE.
SEE NOTE 1
(E) S.O.G.
SLAB REINF. PER PLAN
PREPARE SUBGRADE
AS PER
GEOTECHNICAL
REPORT
Ls
ED
G
E
1
"
C
O
N
T
.
6"
NOTE:
1. WHERE ADHESIVE DOWELS CANNOT BE INSTALLED, CONTRACTOR'S OPTION TO CHIP BACK
(E) SLAB-ON-GRADE AND EXPOSE (E) REINFORCEMENT TO LAP WITH NEW SLAB BARS.
V.
I
.
F
.
4"
M
I
N
.
AT CONTROL JOINT
SAW CUT WITH EARLY
ENTRY SAW AS SOON
AS CONC. WILL NOT
RAVEL. FILL WITH
SEALANT
TYP. SLAB REINF.
PER PLAN
PREPARE
SUBGRADE
PER GEOTECH.
REPORT
1
1
/
4
"
+
/
-
H,
P
E
R
P
L
A
N
1/4"+/-
EXTEND 50% OF BARS
ACROSS JOINT
SEE NOTE 2
NOTES:
1. CONTRACTOR TO SUBMIT THE CONTROL AND CONSTRUCTION JOINT PLAN TO THE SEOR AND
ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO POURING THE SLAB-ON-GRADE.
2. BARS MAY BE CONTINUOUS AT CONTROL JOINTS IN REGIONS NOT SENSITIVE TO DISTRIBUTED
SHRINKAGE CRACKING (E.G., COVERED, ETC.). INCLUDE PROPOSED LOCATIONS IN THE PLAN NOTED
IN NOTE 1.
3. DO NOT CUT SLAB BARS AT CONTROL JOISTS AT STRUCTURAL SLAB-ON-GRADES. PER PLAN FOR
LOCATIONS.
FTG. PER PLAN,
(E) S.O.G., V.I.F.
SEE SCH. FOR REBARSEE SCH. FOR REBAR
SEE FOR
CONN. TO (E) S.O.G.
3/S0.22
PREP SUBGRADE
PER GEOTECH.
REPORT, TYP.
PER PLAN
PE
R
P
L
A
N
PE
R
G
E
O
T
E
C
H
.
R
E
P
O
R
T
6
'
-
0
"
NOTE:
1. ALL EXCAVATIONS SHALL BE MADE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE
GEOTECH. REPORT AND OSHA REQUIREMENTS.
2. ADJACENT (E) FOUNDATIONS TO BE UNDERPINNED AS REQ'D.
Ld
h
STEM WALL
6" THK.
#4 @ 12" O.C. E/W#4 @ 12" O.C. E/W
#4 @ 12" O.C.
INTO S.O.G.
12"
Ls
SEE PLAN FOR REBAR
S.O.G. NOT SHOWN
FOR CLARITY
4
"
M
I
N
.
STEM WALL, SEE
FOR REBAR, DISPLACE
AROUND SLEEVE
4/S0.22
MIN. (2) HORIZ. BARS
RUNNING ABOVE SLEEVE
SLEEVE, SEE M.E.P. DWGS.PROVIDE (4) #4 DIAG.
BARS, EXTEND Ld
BEYOND SLEEVE.
PROVIDE STD. HOOK IF
Ld CANNOT BE ACHIEVED
'H
'
'H
'
MIN.
1' - 6"
3"
M
A
X
.
'd
'
NATURAL SLOPE
NOTES:
1. COORDINATE LOCATION, DEPTH, EXTENT, AND EDGE CONDITIONS OF DEPRESSION WITH
ARCHITECTURAL DRAWINGS.
2. SEE TYP. S.O.G. DETAIL FOR SLAB THICKNESS 't', REINF. & SUBGRADE PREPARATION, TYP.
1:6 MAX. SLOPE
SLAB REINF. PER
PLAN, TYP.
NOTES:
1. COORDINATE SIZE AND LOCATION WITH ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS.
1
1
/
2
"
C
L
R
.
NO
T
E
1
6"
M
A
X
.
TYP.
2" CLR.
TYP.
NOTE 1
SLAB ON GRADE
APPLY BONDING AGENT
#4 DOWELS AT 18" MAX.
SPACING W/ 3" EMBED AT
PERIMETER AND AT EA.
CORNER
#4 @ 12" CONT.
SITE ACCESSORY, S.A.D.
BASE CONN. PER MANUF.
TYP.
1' - 0"
3/4" CHAMFER AT TOP
OF CONC. EXPOSED TO
VIEW
DBL. TIES AT TOP
(4) #4 VERT. +
#3 @ 10" O.C. TIES, TYP.
TYP.
3" CLR.,
GR
A
D
E
M
I
N
.
6
'
-
0
"
E
M
B
E
D
.
B
E
L
O
W
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
2/
2
5
/
2
0
2
5
1
:
5
5
:
5
7
P
M
S0.22
TYPICAL
FOUNDATION
DETAILS
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S0.22 3/8" = 1'-0"
1 FOOTING REINFORCING AT CORNER AND
INTERSECTION
S0.22 1" = 1'-0"
3 SLAB-ON-GRADE TO EXISTING SLAB-ON-GRADE
S0.22 1" = 1'-0"
2 TYPICAL SLAB-ON-GRADE
S0.22 1" = 1'-0"
4 TYPICAL FOUNDATION WITH STEM WALL
S0.22 1" = 1'-0"
5 TYPICAL SLEEVE PENETRATION IN STEM WALL
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
S0.22 3/4" = 1'-0"
7 CONCRETE SLAB-ON GRADE DEPRESSION
S0.22 3/4" = 1'-0"
6 TYPICAL HOUSEKEEPING PAD AT SLAB-ON-GRADE
S0.22 3/4" = 1'-0"
8 TYPICAL SITE PILE FOOTING
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
1. JOIST TO SILL OR GIRDER, TOE NAIL
2. BRIDGING TO JOIST, TOE NAIL E/E
3. 1" x 6" SUBFLOOR OR LESS TO EA. JOIST, FACE NAIL
4. WIDER THAN 1" x 6" SUBFLOOR TO EA. JOIST, FACE
NAIL
5. 2" SUBFLOOR TO JOIST OR GIRDER, BLIND & FACE
NAIL
6. SOLE PLATE TO JOIST OR BLOCKING, FACE NAIL
SOLE PLATE TO JOIST, AT BRACED WALL PANELS
7. TOP PLATE TO STUD, END NAIL
8. STUD TO SOLE PLATE
9. DOUBLE STUDS, FACE NAIL
10. DOUBLE TOP PLATES, FACE NAIL
DOUBLE TOP PLATES, LAP SPLICE (PARTITION)
11. BLOCKING BETWEEN JOISTS OR RAFTERS TO TOP
PLATE, TOE NAIL
12. RIM JOIST TO TOP PLATE, TOE NAIL
13. TOP PLATES, LAP AND INTERSECTIONS, FACE NAIL
14. CONTINUOUS HEADER, TWO PIECES
15. CEILING JOISTS TO PLATE, TOE NAIL
16. CONTINUOUS HEADER TO STUD, TOE NAIL
17. CEILING JOISTS, LAP OVER PARTITIONS, FACE NAIL
18. CEILING JOISTS TO PARALLEL RAFTERS, FACE NAIL
19. RAFTER TO PLATE, TOE NAIL
21.1" x 8" SHEATHING OR LESS TO EA. BEARING, FACE
NAIL
22.WIDER THAN 1" x 8" SHEATHING TO EA. BEARING,
FACE NAIL
23.BUILT-UP CORNER STUDS
24.BUILT-UP GIRDER & BEAMS
25. 2" PLANKS, FACE NAIL
NAILING SCHEDULE
CONNECTION NAILING
(3) 8d
(2) 8d
(2) 8d
(3) 8d
(2) 16d
16d @ 16" O.C.
(3) 16d @ 16" O.C.
(2) 16d
(4) 8d TOE NAIL OR
(2) 16d END NAIL
16d @ 24" O.C.
16d @ 16" O.C.
(8) 16d
(3) 8d
8d @ 16" O.C.
(2) 16d
16d @ 16" O.C. ALONG
EACH EDGE
(3) 8d
(4) 8d
(3) 16d
(3) 16d MIN. SEE 2019 CBC
TABLE 2308.7.3.1
(3) 8d
20.1" DIAGONAL BRACE TO EA. STUD & PLATE, FACE
NAIL
(2) 8d
(2) 8d
(3) 8d
16d @ 24" O.C.
20d @ 32" O.C. FACE NAIL
T&B STAGG. ON OPP.
SIDES & (2) 20d FACE NAIL
AT ENDS AND SPLICES
16d @ EACH BEARING
26.COLLAR TIE TO RAFTER, FACE NAIL (3) 10d
27.JACK RAFTER TO HIP (3) 10d TOE NAIL
(2) 16d FACE NAIL
28.ROOF RAFTER TO 2x RIDGE BEAM (2) 16d TOE NAIL
(2) 16d FACE NAIL
29.JOIST TO BAND JOIST, FACE NAIL (3) 16d
30.LEDGER STRIP, FACE NAIL AT EACH JOIST (3) 16d
31.WOOD STRUCTURAL PANELS SUBFLOOR, ROOF &
WALL SHEATHING (TO FRAMING)
10d
32.PANEL SIDING (TO FRAMING) 8d
33.FIBERBOARD SHEATHING 8d
34.INTERIOR PANELING 6d
D = DEPTH OF JOIST
W = STUD WIDTH
L = CLEAR SPAN
W
PARTITIONS MAX.
0.25W, 0.4W FOR
MI
N
.
W
MI
N
.
W
5/8" MIN.
FOR PARTITIONS
0.4W, 0.6W
MA
X
.
1/
6
D
MAX.
1/3 D
1/3 L MAX.
1/3 L MIN.D MIN.
MA
X
.
1/
3
D
T&
B
2"
M
I
N
.
DMI
N
.
3/
4
D
NOTES:
1. NOTIFY ENGINEER OF RECORD FOR ANY PENETRATIONS THAT FALL OUTSIDE OF THE SPECIFIED PARAMETERS.
2. REFER TO MANUFACTURER SPECIFICATIONS FOR ALLOWABLE HOLES / NOTCHES IN ENGINEERED WOOD.
DBL TOP PL
STUD WALL
PER PLAN
JOIST PER PLAN
DRILL NEAT HOLE AT
CENTERLINE OF PLATES
1 3/4" MAX. AT 2x4 PL
2 3/4" MAX. AT 2x6 PL
SEE NOTE 2
PROVIDE CTS STRAP TIE
AT EA. NOTCHED PL
(2 STRAPS AT NOTCHED
DBL. TOP PLATE)
W/ (4) 10d MIN., E/E,
EA. STRAP
NOTE:
1. FLOOR JOISTS LOCATED UNDER PLUMBING WALL SHALL BE DOUBLED (U.O.N.) & SPACED TO GIVE PROPER
CLEARANCE FOR PIPING.
2. FOR PENETRATIONS LARGER THAN DIMENSIONS SHOWN, CONTRACTOR SHALL VERIFY WITH ENGINEER.
4'-0" MIN. TO FIRST
TOP PLATE SPLICE
TYP. EA. DIRECTION
TY
P
.
5/
8
"
M
I
N
.
TY
P
.
1"
M
I
N
.
E/E
6" MIN.
2x DBL. TOP PL
2x DBL. TOP PL
WHERE PLATE IS
DRILLED OR NOTCHED
MORE THAN 1/3 WIDTH
OF PLATE IT IS
CONSIDERED A BREAK
IN THE PLATE & AN A.B.
IS REQUIRED BOTH
SIDES
EA. SILL PLATE SHALL
HAVE (2) A.B. AS A MIN.
A.B. & WASHER PER
SHEAR WALL
SCHEDULE (5/8"Ø A.B.
W/ 3" SQ. x 3 GA PLATE
WASHER U.O.N.)
NOTES:
1. db REFERS TO A.B. Ø.
2. SILL PLATES IN CONTACT W/ CONCRETE SHALL BE P.T.D.F. OR FOUNDATION GRADE REDWOOD.
3. IF 7db MIN./12" MAX. DIM. W/ HD THEN MEASURE FROM CENTERLINE HD A.B.
4. SILL BOLTS SHALL BE 5/8"Ø L-BOLTS W/ 7" EMB. INTO FTG. (BELOW SLAB WHERE OCCURS) AT 4'-0"
MAX. SPACING.
9"
M
A
X
.
7d
b
M
I
N
.
9"
M
A
X
.
7d
b
M
I
N
.
9"
M
A
X
.
7d
b
M
I
N
.
9" MAX.
7db MIN.
FO
R
A
L
L
W
A
L
L
S
,
T
Y
P
.
SE
E
S
H
E
A
R
W
A
L
L
S
C
H
E
D
U
L
E
F
O
R
S
P
A
C
I
N
G
,
4
'
-
0
"
M
A
X
.
PLAN VIEW
POST PER PLAN
A35 E/S (USE LTP4 AT
DOOR OPENING
OR END OF SILL)
SEE NOTES 1 & 2
3x SILL PLATE. SILL PL
SHALL BE P.T.D.F. WHEN
IN CONTACT WITH CONC.
NOTES:
1. FOR 2x4 WALLS USE A34 CLIPS.
2. SIMILAR CONDITION AT SILL PLATE OVER WOOD FRAMING.
3. FOR POSTS AT HOLDOWNS, SEE HOLDOWN SCHEDULE. FOR CONNECTION REQUIREMENTS.
S.A.D.
WALL STUDS,
WHERE OCCURS
ANCHORS PER TYP.
S.W. DETAILS, WHERE
S.W. OCCURS.
OTHERWISE, SILL
ANCHORS SHALL BE
PER TYPE 6 S.W. PER
THE S.W. SCHEDULE
CONC. FTG./CURB/STEM
WALL, PER PLAN
A35 E/S (USE LTP4 AT
DOOR OPENING
OR END OF SILL)
SEE NOTES 1 & 2
MEMBER
HANGER
FACE MOUNT TOP FLANGE
2x ROOF RAFTER
2x FLOOR JOIST
DBL. 2x ROOF RAFTER
TJI ROOF RAFTER
TJI FLOOR JOIST
(SPAN < 18'-0")
TJI FLOOR JOIST
(SPAN ≥ 18'-0")
LVL OR DBL. LVL
FLOOR JOIST
4x OR 6x BEAM
GLULAM OR PSL
BEAM
LSU³ OR U³ JB OR HUTF³
LUS OR U LB OR JB
HU³ HUTF³
IUS OR HU³ ITS OR LBV³
HU LBV
HU BA
HUCQ HB
MIU OR HU LBV OR BA
ITSIUS
NOTES:
1. ALL HANGERS BY SIMPSON OR APPROVED EQUIVALENT. INSTALL PER MANUFACTURER'S INSTRUCTIONS,
FILL ALL HOLES U.O.N.
2. USE LARGEST HANGER ALLOWED FOR FRAMING MEMBER.
3. HANGER MAY BE SLOPED UP TO 45°.
LVL ROOF RAFTER HU³ LBV³
1 OR 2 HOUR FIRE
WALL DGF DGF
(4) 16d (KING
TO HDR.)
(2) 2x SILL PLATE AT WINDOW
A34 T&B AT
KING TYP.(2) 2x TOP PL,
TYP. U.O.N.
3x SILL PL
W/ (16) 16d NAILS IN (2) ROWS STAGGERED
4' - 0" MIN. LAP
1 WHERE STUD OCCURS OVER ANY PART OF
A.B. NUT OR WASHER PROVIDE 2x SCAB PLATE
W/ (4) 10d NAILS TO SILL PLATE. DRILL 1 1/2" Ø
HOLE FOR A.B.
2
2
(1) 2x KING STUD FOR ROUGH OPENING LESS
THAN 3'-0" WIDE AT INTERIOR WALLS, (2) 2x
KING STUDS FOR ROUGH OPENING OVER 3'-0"
WIDE AND AT EXTERIOR WALLS, U.O.N.
LOCATE SPLICE
OVER STUD, TYP.
3 2x TRIMMER STUD AT ROUGH OPENING.
SINGLE STUD AT OPNG < 3'-0"
DLB. STUD AT OPENING > 3'-0".
4 HDR. PER PLAN. 4x8 MIN. AT 2x4 WALL & 6x8
MIN. AT 2x6 WALL, U.O.N. W/ A34 CLIP T&B, E/E
(4 TOTAL)
5 2x BLOCKING AT WALL MID-HEIGHT & 6'-0" O.C.
AT WALLS OVER 12'-0" IN HEIGHT
6' - 0" MAX.
3
1
3
6
CRIPPLE TO
KING w/ 16d @
12" O.C., TYP.
2x STUDS
@ 16" O.C.,
TYP. U.O.N.
6
5
BASE CAPPOST CAPPOST END CAP
POST PER PLAN
SIMP. 'ECCQ' POST CAP
ROTATE STRAP AS
REQ'D. TO CONCEAL
IN FINISHES
ROTATE STRAPS AS REQ'D.
TO CONCEAL FASTENERS IN
WALL, TYP.
SIMP. 'CCQ' POST CAP
SIMP. 'CCQ'
POST CAP
POST
PER PLAN
BM.
PER PLAN
COL. &
BM. SPLICE
A B C
S.A.D.
CL
POST PER PLAN
SIMP. 'ECC' POST CAP
ROTATE STRAP AS
REQ'D. TO CONCEAL
IN FINISHES
ROTATE STRAPS AS REQ'D. TO
CONCEAL LAG BOLTS IN WALL,
TYP.
SIMP. 'CC' POST CAP
CONTINUOUS
BM. SIM.
COL. & BM. SPLICE
SIMP. 'CC'
POST CAP
POST PER PLAN
BM.
PER PLAN
BASE CAPPOST CAPPOST END CAPA B C
CL
WHERE BM. WIDTH IS WIDER
THAN POST BELOW, INSTALL A
1/2" THK. CAP PL OVER HSS POST
TO MATCH BM. WIDTH ABOVE
SIM. AT CONT.
BM. CONDITION
W/ 'CCOQ' POST
CAP, WHERE
OCCURS
HSS POST
PER PLAN
3/16SIMP. 'ECCOQ' POST CAP
SDS OPTION
BOLTED OPTION
S.A.D.
WHERE BEAM WIDTH IS WIDER
THAN POST BELOW, INSTALL A
1/2" THK. CAP PL OVER HSS POST
TO MATCH BM. WIDTH ABOVE
SIM. AT CONT.
BM. CONDITION
W/ 'CCO' POST
CAP, WHERE
OCCURS
HSS POST
PER PLAN
3/16SIMP. 'ECCO' POST CAP
HSS POSTD
HSS POSTD
NOTE:
1. WHERE BEAMS INTERSECT AT A SINGLE POST PROVIDE SIMPSON ECCLQ/CCCQ/CCTQ AS REQUIRED
3x SILL PLATE. SILL PL
SHALL BE P.T.D.F. WHEN
IN CONTACT WITH CONC.
WALL STUDS,
SEE
5/8"Ø SIMP. TITEN HD
ANCHORS W/ 2 1/2"
EMB. @ 48" O.C. MAX.
(E) S.O.G., MIN. 4" THK.,
V.I.F.
9/S0.23
PARALLEL TO JOISTS
PERPENDICULAR TO JOISTS
DBL. TOP PL
CEILING JOIST
PER PLAN
STUD WALL, S.A.D.
1/2" GAP
SIMPSON SDPW19600
DEFLECTOR SCREWS
@ 48" O.C. (IAPMO ER-192)
W/ 1" EMB. INTO JOIST
PRE-DRILL 3/8"Ø HOLE
IN DBL. TOP PL
2x6 FLAT BLKG. @ 48" O.C.
SUPPORTED ON CEILING JOISTS
PER PLAN. DO NOT ATTACH TO
(E) TRUSS MEMBERS
1/2" GAPPRE-DRILL 3/8"Ø HOLE
IN DBL. TOP PL
JOIST PER PLAN
3/4" OFFSET
3/4" OFFSET
SIMPSON SDPW19600
DEFLECTOR SCREWS
@ 48" O.C. (IAPMO ER-192)
W/ 1" EMB. INTO BLKG.STUD WALL, S.A.D.
DBL. TOP PL
NOTE:(E) TRUSS MEMBERES NOT SHOWN FOR CLARITY.
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
N.T.S.
2/
2
5
/
2
0
2
5
1
:
5
5
:
5
8
P
M
S0.23
TYPICAL WOOD
DETAILS
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S0.23 N.T.S.
1 NAILING SCHEDULE
S0.23 N.T.S.
4 HOLES & NOTCHES IN STUDS & JOIST FOR SAWN
LUMBER
S0.23 1" = 1'-0"
5 HOLES & STRAPS AT STUD WALL TOP PLATE FOR
MEP
S0.23 1" = 1'-0"
6 TYPICAL SILL BOLTING LAYOUT
S0.23 1" = 1'-0"
7 TYPICAL WOOD POST BASE AT SILL PLATE
S0.23 N.T.S.
8 TYPICAL HANGER SCHEDULE
S0.23 N.T.S.
9 TYPICAL WALL/HEADER FRAMING
S0.23 1" = 1'-0"
10 WOOD BEAM TO POST CONNECTION
S0.23 1" = 1'-0"
15 TYPICAL NON-BEARING WALL TO (E) S.O.G.
S0.23 N.T.S.
2 INTERIOR NON-BEARING WALL TOP RESTRAINT
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
NOTES:
1. USE 1/2" CDX PLYWOOD UNLESS OTHERWISE NOTED.
2. E.N. ACROSS ALL PANEL EDGES, FIELD NAILING IS 12" O.C. ALL NAILS ARE COMMON WIRE NAILS, MAY USE
10d SHORTS (2 1/8" MIN. LENGTH) W/ FULL HEADS.
3. ALL MEMBERS RECEIVING E.N. INCLUDING SILL PLATE SHALL BE 3x MIN. NAILING SHALL BE STAGGERED.
EXCEPTION: WHERE PLYWOOD IS APPLIED TO ONLY ONE SIDE OF WALL AND NAIL SPACING IS 6" O.C.
MEMBERS RECEIVING EDGE NAILING CAN BE 2x.
4. ALL FDN. ANCHOR BOLTS ARE 5/8"Ø L-BOLTS W/ 7" EMB. & A 2" HOOK OR ALL THREAD ROD WITH A NUT,
WASHER AND NUT ON THE EMBEDDED END. WHEN SHEAR WALLS ARE LOCATED ON (E) CONCRETE 5/8"Ø
ALL THREAD ROD WITH SIMPSON SET-XP EPOXY MAY BE USED. ANCHORS SHALL HAVE A MIN.
EMBEDMENT OF 7", A MIN. EDGE DISTANCE OF 1 3/4" AND SHALL HAVE A 3" SQ. x 3 GA PLATE WASHER AT
THE SILL. CONTRACTOR MAY USE BP5/8-3 OR BPS5/8-3 SIMPSON WASHERS. PLATE WASHER SHALL
EXTEND TO WITHIN 1/2" OF THE EDGE OF THE BOTTOM PLATE ON THE SIDE(S) WITH SHEATHING. WHERE
WALL IS GREATER THAN 2x4 AND SHEATHING OCCURS ON BOTH SIDES, ANCHOR BOLTS SHALL BE
STAGGERED. A.B. & WASHER SHALL BE HOT DIPPED GALVANIZED.
5. SILL CONNECTION IS FOR WOOD TO WOOD CONNECTION ONLY, TYP. BTWN. FLOORS. WHERE SPACING IS
CLOSER THAN 8" O.C. RIM OR RIM BLOCKING SHALL BE 3 1/2" MIN. WIDTH AND FASTENERS SHALL BE
STAGGERED. SDS 1/4 x 6 MAY BE USED IN LIEU OF SDWS 0.220 x 6 AT CONTRACTOR'S DISCRETION.
MARK
10d @ 6" O.C.
CAPACITY
(PLF)
286
RIM CONN. SPACING
(SIMP. A35, LTP4 OR
LS50)
24" O.C. 16" O.C.
SILL PL CONN.
SPACING (SIMP.
SDWS 0.220 x 6)
SEE NOTE 5
FDN. ANCHOR
SPACING. SEE
NOTE 4
48" O.C.
424
EDGE NAILING
(E.N.)
SEE NOTE 2
12" O.C. 48" O.C.16" O.C.10d @ 4" O.C.
6
4
a b c d
3x P.T. SILL PL
FDN. ANCHOR
SIZE & SPACING
PER SHEAR
WALL SCH.
EDGE NAILING AT
HORIZ. & VERT.
EDGES, STAGGER
NAILS W/ NAILS FROM
ADJACENT PANELS
LEAVE 1/16" GAP
BTWN. PANEL
EDGES, TYP.
3x BLKG. CENTERED
ON HORIZ. PLYWD.
JOINTS
VERT. PLYWD. JOINTS
TO BE CENTERED ON
STUDS
END POST &
HOLDOWN PER PLAN
CONC. S.O.G.
PER PLAN
MIN. PANEL
SIZE 24" SQ.
TYP. STUDS
PER PLAN W/ F.N.
PER SHEAR WALL
SCH.
CONC.
FOUNDATION
PER PLAN
7"
E
M
B
.
PE
R
H
D
S
C
H
.
EM
B
.
3/8" MIN.
EDGE DIST., TYP.
3x (MIN.) STUDS AT
PANEL EDGES FOR
NAILING TIGHTER
THAN 6" O.C.
STUD WALL PER PLAN
NOTES:
1. KEY NOTES INDICATED WITH LETTERS REFER TO SHEAR WALL SCHEDULE ON DETAIL
2. REINFORCING NOT SHOWN IN CONCRETE ELEMENTS, SEE FOUNDATION DETAILS FOR BALANCE OF
INFORMATION..
A
3x P.T. SILL PL
D
ROOF
S.A.D.
STUD WALL PER PLAN
ROOF JOISTS PER PLAN
ROOF SHTG. PER PLAN
CONT. DBL. TOP PL
3x RIM BLKG.
B.N.
A
B
ROOF - JOISTS PERPENDICULAR
1/S0.24
SHEAR WALL SHTG. PER
PLAN TO BE PLACED ON
INSIDE FACE OF WALL
(E) CONC. S.O.G.,
SEE FOR
CONN. TO FDN.
3/S0.22
SHEAR WALL SHTG. PER
PLAN TO BE PLACED ON
INSIDE FACE OF WALL
INTERIOREXTERIOR
INTERIOREXTERIOR
STEM WALL PER PLAN
MI
N
.
7"
E
M
B
.
1/
2
"
NOTES:
1. KEY NOTES INDICATED WITH LETTERS REFER TO SHEAR WALL SCHEDULE ON DETAIL
2. WHERE ONLY 1 SIDE OF SHEAR WALL SHEATHING IS CALLED OUT PLAN, SHEATHING MAY BE APPLIED ON
EITHER SIDE OF WALL.
3. REINFORCING NOT SHOWN IN CONCRETE ELEMENTS, SEE FOUNDATION DETAILS FOR BALANCE OF
INFORMATION.
4. SEE FRAMING PLANS FOR DIRECTION OF JOISTS. BOTH PARALLEL AND PERPENDICULAR JOISTS ARE
SHOWN ON THIS DETAIL FOR REFERENCE.
ROOF
S.A.D.
STUD WALL PER PLAN
ROOF JOISTS PER PLAN
ROOF SHTG. PER PLAN
CONT. DBL. TOP PL
3x BLKG.
B.N.
A
B
1/S0.24
ROOF - JOISTS PERPENDICULAR
SHEAR WALL SHTG.
PER PLAN
JOIST OVERLAP BEYOND
STEM WALL PER PLAN
MI
N
.
7"
E
M
B
.
STUD WALL PER PLAN
A
3x P.T. SILL PLD
SHEAR WALL SHTG.
PER PLAN
1/
2
"
(E) CONC. S.O.G.,
SEE FOR
CONN. TO FDN.
3/S0.22
ALIGN T.O.
FDN. W/
T.O. (E)
S.O.G., TYP.
OPENING
S.A.D.
4'-0"x4'-0" MAX.,
U.O.N. ON PLAN
3x BLKG. @ STRAP
BM. OR DBL.
JOISTS, PER PLAN
CONT. SIMP CS16 STRAP E/S,
4'-0" MIN. END LENGTH
ROOF SHTG.
B.N. E/S OF OPNG. WHERE SIMP.
STRAP DOES NOT OCCUR
MIN.
3 BAYS
FIELD NAILING, TYP.
MIN PANEL SIZE 24" SQ.
DIAPHRAGM BOUNDARY
NAILING, (B.N.) TYP.
4'x8' PLYWD. SHEETS W/
FACE GRAIN PERP. TO
FRAMING, U.O.N. PLACE
IN A STAGGERED
PATTERN, TYP. U.O.N.
3x CONT. RIM JOIST OR
BLKG, TYP @ DIAPHRAGM
EDGES
AA
B
B
SECTION A-A SECTION B-B
JOIST FRAMING
PER PLAN
DIAPHRAGM BOUNDARY
NAILING (B.N.) TYP.
PANEL EDGE NAILING
(E.N.) WHERE BLOCKED
DIAPHRAGM IS SPECIFIED
PER PLAN TYP.
PANEL EDGE NAILING
(E.N.) TYP. SEE NOTE 1
PLYWD. SHTG.
PER PLAN
JOISTS
PER PLAN
E.N.
1/8" GAP
EDGE DIST.
3/8" MIN.PLYWD. SHTG.
PER PLAN
3x4 FLAT BLKG. 3x
FULL DEPTH BLKG.
MAY BE USED AT
CONTRACTOR'S
OPTION
E.N.
1/8" GAP
EDGE DIST.
3/8" MIN.
NOTE:
1. ALL FRAMING MEMBERS AND BLOCKING RECEIVING NAILS SPACED AT 2 1/2" O.C.
OR TIGHTER SHALL BE 3x MIN. WIDTH
NOTES:
1. IF REQUIRED EMBEDMENT IS DEEPER THAN FOOTING CALLOUT ON PLAN, FOOTING SHALL BE LOCALLY
DEEPENED TO PROVIDE 3" MIN. CLR. BETWEEN ANCHOR HEAD AND SOIL. EMBEDMENT DIMENSION IS TAKEN
FROM TOP OF REBAR TIE, NOT TOP OF FOOTING DEEPEN TIES TO MATCH.
2. ALL HARDWARE (ALL-THREAD ROD, COUPLERS, WASHERS, NUTS, ETC.) IN CONTACT WITH CONCRETE TO BE
HOT DIPPED GALVANIZED.
3. FOR PROJECTS IN THE CITY OF LOS ANGELES LISTED HOLDDOWN CAPACITY SHALL BE MULTIPLIED BY A
MODIFICATION FACTOR OF 0.75.
Le1
(INTERIOR FTG.,
MAT SLAB)
HDU5
HDU4
5645
4565
PERIMETER FOOTINGINTERIOR FOOTING
ANCHOR
Ø
5/8"
5/8"
HOLDOWN CAPACITY
(LBS.)
3x3x1/2"
3x3x3/8"
WASHER SIZE
6"
6"
Le1
(EXTERIOR FTG.)
6"
6"
LOCATE CONT. BAR
AT EA. CORNER OF
TIE REINF. OR ADD
#4 x 4'-0" DOWELS
WHERE CONT. BARS
DO NOT OCCUR
MIN. POST
SIZE U.O.N.
4x4
4x4
FOOTING & REINF.
PER PLAN
PROVIDE #5 TIE
E/S OF ANCHOR
HOLDOWN
PER PLAN
POST
PER PLAN
ANCHOR ROD
PER SCH.
PER PLAN
PE
R
P
L
A
N
MI
N
.
3"
C
L
R
.
MAX.
1 1/2"
PE
R
S
C
H
.
'L
e
'
CONC. SLAB ON
GRADE PER PLAN
(REINF. NOT SHOWN)
PER PLAN
PE
R
P
L
A
N
MI
N
.
3"
C
L
R
.
ENSURE WASHER
PLATE IS WITHIN
REBAR CAGE
PE
R
S
C
H
.
'L
e
'
CONC. SLAB ON
GRADE PER PLAN
(REINF. NOT SHOWN)
PROVIDE (N) 2x4 STUDS
MIN, @ 16" O.C.
REMOVE (E) TOP
PLATE ABOVE STUDS
TO BE REPLACED,
EXTEND (N) PLATE
TO FIRST ADJACENT
UNDAMAGED STUD
AT E/E
(E) ROOF FRAMING
NOT SHOWN FOR
CLARITY
REMOVE (E) WALL
STUDS AT AREAS OF
DETERIORATION
TYP.
END LENGTH,
SPLICE (E) & (N) TOP
PLATES W/ CS14 STRAP,
20" END LENGTH, TYP.
REMOVE (E) BOT. PLATE
BELOW STUDS TO BE
REPLACED, PROVIDE 3x
BOT. PLATE, EXTEND TO
FIRST ADJACENT
UNDAMAGED STUD AT E/E
FRAMING, COORDINATE W/ S.E.O.R.
EXTENT OF DAMAGE/DETERIORATION,
CONTRACTOR TO SURVEY (E)
PROVIDE ADD'L STUD
UNDER END OF T&B
PLATES
SILL BOLTS MIN. 5/8"⌀
SIMPSON TITEN SCREW
ANCHOR W/ 4" EMB.,
SEE DETAIL 6/S0.23NOTES:
1.SEE DETAIL FOR INFORMATION NOT SHOWN
2.CONTRACTOR TO PROVIDE SHORING OF ROOF STRUCTURE AS REQD, AT LOAD BEARING WALLS.
3.OPTION TO REPLACE ONLY (E) BOT. PL. IF STUDS ABOVE ARE IN SOUND CONDITION.
4.FOR EXTERIOR WALLS, REMOVE SHEATHING AT LEAST ONE STUD BAY BEYOND DAMAGE EXTENT &
REPLACE W/ MIN. 1/2" PLYWOOD W/ 10d B.N. & F.N. @ 12" O.C.. S.A.D. FOR REPLACEMENT OF FINISHES.
9/S0.23
2x MID-HEIGHT
BLKG., TYP.ROOF EL.
VARIES
B.O. TRUSS EL.
VARIES
(E) ROOF TRUSS,
V.I.F., DEPTH
VARIES, TYP.
(E) 1x STRAIGHT
SHEATHING, V.I.F.
ROOF SHEATHING
PER PLAN
ROOF JOISTS PER PLAN,
ALIGNED W/ T.O. (E)
TRUSS TOP CHORD, TYP.
CEILING JOISTS PER PLAN,
ALIGN W/ B.O. (E) TRUSS
BOTTOM CHORD
FASTEN SHEATHING
TO (N) FRAMING ONLY
2x6 MIN. FLAT @ 6'-0" O.C.
MAX. W/ (3) 10d NAILS TO
EA. CEILING JOIST,
STAGGER AS NEEDED
TOTAL SHEAR WALL LENGTH PER PLAN
E.N. SHTG. TO
SHEAR WALL END
POST, TYP.
4x BLKG. AT
STRAP, TYP.
SIMP. CS16
STRAP ABOVE &
BELOW OPNG.
E.N. SHTG. TO
SHEAR WALL KING
POST, TYP.
LENGTH PER PLAN
WALL PIER
LENGTH PER PLAN
WALL PIER
OPEN
NOTE:
1. FOR TYPICAL FRAMING AROUND AN OPENING, SEE DETAIL
OR TO END OF WALL
EXTEND STRAP 2 BAYS MIN.
TYP. HEADER & STUD
FRAMING, SEE NOTE 1
9/S0.23
3'-6" MAX.
SIMP. COL. CAP
PER DET.
CLIP PER S.W. SCH.
SHTG. PER PLAN
BM. PER PLAN
SW
STRAP
PER PLAN
JOIST &
ORIENTATION
PER PLAN
WHERE OCCURS
RIM JOIST
OR BLKG.
POST PER PLAN
CL STRAP
EQ. U.O.N.EQ. U.O.N.
NOTE:
1. JOIST FRAMING AND SHEAR WALL SHEATHING NOT SHOWN FOR CLARITY.
(E) OR (N) STUDS
PER PLAN 10/S0.23
3x BLOCKING MATCHING
DEPTH OF ROOF JOISTS
FOR (1) BAY E/S OF
BEAM, NOTCH AT (E)
TRUSS TOP CHORDS,
TYP., ATTCH TO EACH
JOIST W/ A35 CLIP E/E
DRAG BEAM PER PLAN
BLOCKING REQD. FOR
1 BAY E/S OF BEAM ONLY
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
2/
2
5
/
2
0
2
5
1
:
5
6
:
0
1
P
M
S0.24
TYPICAL WOOD
DETAILS
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S0.24 N.T.S.
1 SHEAR WALL SCHEDULE
S0.24 1/2" = 1'-0"
2 TYPICAL PLYWOOD SHEAR WALL ELEVATION
S0.24 1" = 1'-0"
5 TYPICAL EXTERIOR SHEAR WALL
S0.24 1" = 1'-0"
9 TYPICAL INTERIOR SHEAR WALL
S0.24 1" = 1'-0"
13 DIAPHRAGM OPENING AT ROOF
S0.24 1/2" = 1'-0"
14 TYPICAL DIAPHRAGM FRAMING
S0.24 1" = 1'-0"
3 TYPICAL FOUNDATION HOLDOWN DETAILS
S0.24 1/2" = 1'-0"
7 TYPICAL WALL REPAIR DETAIL
S0.24 1" = 1'-0"
11 TYPICAL ROOF AND CEILING
S0.24 1" = 1'-0"
15 OPENING REINFORCEMENT AT WOOD SHEAR
WALL
S0.24 1" = 1'-0"
16 WOOD BEAM COLLECTOR TO WALL
S0.24 1" = 1'-0"
12 BRACING AT DRAG BEAM
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
STRONG-WALL®HIGH STRENGTH WOOD SHEARWALL SHEAR ANCHORAGE
MODEL
SEISMIC
Lt OR
Lh(in.)
SHEAR
REINFORCEMENT
MIN. CURB/
STEMWALL
WIDTH (in.)
ANCHOR
BOLT
FIELD TIE AND SECURE DURING CONCRETE
PLACEMENT. OVERLAP VARIES WITH BOLT
SPACING.
#3 HAIRPIN, GRADE 60 REBAR (MIN.)
ANCHOR BOLT
#3 HAIRPIN (#3 TIE SIMILAR).
SEE TABLE FOR REQUIRED QUANTITY.
3"
Lh MIN.
1 1/2" CLR.
HAIRPIN INSTALLATION
HAIRPIN SHEAR REINFORCEMENT
(GARAGE CURB SHOWN. OTHER FOOTING TYPES SIMILAR.)
WSWH18 15 (2) #3 HAIRPINS 6
(2) 1" WSWH-AB
WSWH-RTBL
BRICK LEDGE
INSTALLATION
TOP OF CONCRETE
(2) 1" WSWH-AB
WSWH-RTPF
PANEL FORM
INSTALLATION
(2) 1" WSWH-AB
WSWH-RT WITH
ANCHOR BOLT
STABILIZERS
2x2
1 1/2"
(2) 1" WSWH-AB (2) 1" WSWH-AB
WSWH-RT EXTERIOR
INSTALLATION
WSWH-RT INTERIOR
INSTALLATION
6 1/2" 6 1/2"
6 1/2"
le
LENGTH
WSWH18 WSWH-AB1x24 1" 24"15 1/2"
WSWH
PANEL
MODEL
MODEL NO. DIAMETER LENGTH L e
DIAMETER
LENGTH
HS ON HIGH STRENGTH MODELS
HEAVY HEX NUT FIXED
IN PLACE ON ALL
WSWH-AB ANCHOR
BOLTS
HEAVY HEX NUT
PLATE WASHER
HEAVY HEX NUT
36
XX
1
HOLES
● MAX. THREE
HOLES IN FACE
AND THREE IN
EDGE.
● 3/4"-DIA.Ø
HOLES, MAX.
● 6" O.C., MIN.
ALLOWABLE SMALL HOLES
FACE AND EDGE DRILL ZONES
ALLOWABLE LARGE HOLES
IN ADDITION TO ALLOWABLE
SMALL HOLES
HOLES FOR
WSWH24X7 PANEL
ONLY
● MAX. OF ONE 4 5/8"x6" HOLE.
● 8" FROM TOP OF PANEL, MIN.
HOLES
● 4 5/8"-DIA. HOLES, MAX.
● MAX. OF TWO 4 5/8"-DIA.Ø
HOLES OR ONE 41/4"x12" HOLE.
● NO MINIMUM ON-CENTER
SPACING REQUIRED.
NO EDGE HOLES
ALLOWED IN LOWER
26" OF PANEL
NO FACE HOLES
ALLOWED IN LOWER
46" OF PANEL
FACE DRILL ZONE
MAINTAIN 1 1/2"
MIN. EDGE
DISTANCE FROM
CHASE AND
OUTSIDE EDGE,
TYP.
NO HOLES
ALLOWED IN TOP
8" OF PANELEDGE DRILL ZONE
MIDDLE 1/3 OF
PANEL THICKNESS FACE DRILL ZONE
CENTER 4 5/8" OF PANEL
FACE AS SHOWN
NO HOLES ALLOWED
IN TOP 8" OF PANEL
24 "
22"
12" ABOVE
EXISTING HOLE, MIN.
INSTALL SDS 1/4"x6" SCREWS AT
AN ANGLE THAT PREVENTS
THEM FROM EXITING SIDE OF
FRAMING; APPROX.
30 DEGREES (TYP.)
WSWH-TP24 46 8
WSWH-TP CONNECTION
MODEL NO.
FASTENER QUANTITY
SWS16150 SDS25600
FURRING NOT
REQUIRED
EXCEPT AS
REQUIRED FOR
FINISH
MATERIAL
ATTACHMENT
TOP PLATES
7/8" MAX. WOOD
SHIM. FOR SHIMS
GREATER THAN 7/8",
SEE
ATTACH WSWH-TP PLATE
(PROVIDED) ON ONE SIDE ONLY WITH
A COMBINATION OF SDS 1/4"x6"AND
SWS16150 CONNECTOR SCREWS
ALIGN WSWH-TP
NOTCHES WITH
BOTTOM OF TOP
PLATES
OPTIONAL 1"Ø BY 1/4" DEEP
COUNTERBORE
STRONG-WALL®
HIGH STRENGTH
WOOD SHEARWALL
1" DIAMETER BY
1/4" DEEP
COUNTERBORE
INSTALL
WSWH-TP ON
EXTERIOR FACE
SWS16150
SDS25600
SECTION
4x FRAMING
SECTION
6x FRAMING
12/S0.31
WSWH-TP18 26 4
STRONG-WALL®
HIGH STRENGTH WOOD SHEARWALL
TOP PLATES
RIM JOIST, BM.,
OR BLKG.
IF APPLICABLE
HEAVY HEX NUT AND
HEAVY BEARING PL
WSWH HOLDOWN
SEE FOR ALLOWABLE
EDGE AND FACE DRILL ZONES
7/8" MAX. WOOD
SHIM. FOR SHIMS
GREATER THAN 7/8",
SEE
WSWH-TP SHEAR
TRANSFER PL
S0.31
10
S0.31
4
3/S0.31
12/S0.31
SEE , , AND
FOR ANCHORAGE DETAILS
HEAVY HEX NUT AND HEAVY
BEARING PLATE
STRONG-WALL®
HIGH STRENGTH
WOOD SHEARWALL
PLACE STRONG-WALL® HIGH STRENGTH WOOD
SHEARWALL OVER THE ANCHOR BOLTS AND
SECURE WITH HEAVY BEARING PLATES AND HEAVY
HEX NUTS (PROVIDED). DO NOT USE AN IMPACT
WRENCH. USE 1 5/8" WRENCH FOR 1" NUT.
TIGHTEN ANCHOR NUTS FINGER TIGHT + 1/2" TURN.
1/S0.31 5/S0.31
6/S0.31
FULL-HEIGHT
ADJACENT
STRONG-WALL®
HIGH STRENGTH
WOOD SHEARWALL
LTP4 CLIP,
MIN. (2) E/S
INSTALL SDS 1/4"x6"
SCREWS (MIN.) FROM THE
TOP SIDE OF THE PLATES
PER QTY. AND SPACING
REQUIREMENTS DETAILED
IN
SEE
FOR TOP CONN.
4x SHIM
BLOCK
FULL-HEIGHT ADJACENT
FRAMING
CRIPPLE SHEARWALL,
BLKG. AND STRAP
4x SHIM BLOCK
STRONG-WALL®
HIGH STRENGTH
WOOD SHEARWALL
SEE
FOR TOP CONN.
1" TO 4" SHIM BLOCK4 1/8" TO 12" SHIM BLOCK
CRIPPLE WALL
FOR 8" TO 12" BLOCK DEPTHS:
ATTACH SIMPSON STRONG-TIE ® CS16 STRAPS AT
EDGE OF WSWH PANEL (EACH SIDE) USING 10dx11/2" NAILS
SHIM BLOCK HEIGHTS GREATER THAN 8" AND UP TO 10":
• 8 NAILS INTO BLOCK
• 8 NAILS INTO WSWH PANEL
SHIM BLOCK HEIGHTS GREATER THAN 10" AND UP TO 12":
• 10 NAILS INTO BLOCK
• 10 NAILS INTO WSWH PANEL
4/S0.31
4/S0.31
TOP OF CONCRETE
HEAVY HEX NUT FIXED
IN PLACE ON ALL
WSWH ANCHOR BOLTS
1" HIGH STRENGTH ROD
HX ON
EXTENSION KIT TOP OF
CONCRETE
WSWH-HSR
CUT TO
LENGTH AS
NECESSARY
HIGH STRENGTH
COUPLER NUT
WSWH-AB
HIGH STRENGTH
COUPLER NUT
LENGTH
6 1/2"
6 1/2"
ASSEMBLY le =
WSWH-AB le +
WSWH-HSR le +6 1/2"
le
WSWH18
WSWH-HSR1x24KT 1" 24"17 1/2"
WSWH-HSR1x36KT 1" 36"29 1/2"
WSWH
PANEL
MODEL
MODEL NO. DIAMETER LENGTH le
24
HX
1
WSWH-HSR
AND WSWH-AB
ASSEMBLY
WSWH-HSR_KT
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
1" = 1'-0"
2/
2
5
/
2
0
2
5
1
:
5
6
:
0
6
P
M
S0.31
TYPICAL WSWH
DETAILS
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S0.31 1" = 1'-0"
1 STRONG-WALL® WSWH SHEAR ANCHORAGE
SCHEDULE AND DETAILSS0.31 1" = 1'-0"
5 WSWH ANCHOR BOLT TEMPLATES
S0.31 1" = 1'-0"
6 WSWH ANCHOR BOLTS
S0.31 1" = 1'-0"
3 TRIM ZONE AND ALLOWABLE HOLES
S0.31 1" = 1'-0"
4 TOP CONNECTION
S0.31 1" = 1'-0"
9 SINGLE STORY WSWH ON CONCRETE
S0.31 1" = 1'-0"
10 STANDARD INSTALLATION BASE CONNECTION
S0.31 1" = 1'-0"
12 TOP OF WALL HEIGHT ADJUSTMENTS
S0.31 1" = 1'-0"
7 WSWH ANCHOR BOLT EXTENSION
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
1
2
3
A B C D E F
25
'
-
0
"
15
'
-
8
"
18' - 6"23' - 7"22' - 6"18' - 0"7' - 1"
89' - 8"
40
'
-
8
"
6x6
6x6
(E) CONC. S.O.G., TYP.
9' -6"
4
5' -6"
4
5' -6"
4
22' -4"
4
2A2A
2A
2A
2A
2A
18
'
-
0"
4
8'
-
0"
6
5' -4"
6
2A2A
6' -6"
6
2A2A
13
'
-
6"
4
2B
2B
2A 2A 2A2A 2A2A
F-25
SF-2A SF-2A SF-2A
SF-2
SF-2ASF-2A
SF
-
2
A
SF
-
2
A
1
S2.01
TYP.
1
S2.01 TYP.
2
S2.01
W
S
W
H
18
x
1
4
WS
W
H
18
x
1
4
6
SF
-
2
6
6 6 6
6
6
REINFORCE SHEAR
WALL AT OPENING,
SEE
6
7
8
3
S2.01
15/S0.24
4
S2.01
4x4
2
S2.01 SIM.
4
S2.01
SIM. E/E OF
STRIP FTG.
SF
-
2
12
12
12 12
1' - 6"
1'
-
6
"
1' - 6"
5
S2.01
14
13
UN
D
E
R
W
S
H
W
E
/
E
3'
-
6
"
S
T
E
M
W
A
L
L
4x6
13
13 13
13
13
13
1313
13
13
S2.02
10
LEGEND:
STRUCTURAL STUD WALL
CONC. FOOTING
OR GRADE BEAM
SW
SHEAR WALL SHTG.
S.W. MARK, SEE SCH.
MIN. LENGTH
JOIST OR TRUSS SPAN
WD. OR STL. BEAM
NON-STRUCTURAL WALL, S.A.D.,
MIN. 2x4 @ 16" O.C. FOR NON-LOAD
BEARING WALLS, SEE DETAIL
STRUCTURAL WALL (B)
SIMP. 'HDU' HOLDOWN
PER KEY NOTES
HEADER, SEE DET.
X
SIZE @ XX"O.C.
X'-XX"
WD. COLUMN (B)
WD. COLUMN
C1
PRE-MANUFACTURED
SHEAR PANEL, SEE S0.31
(E) CONC. FOOTING
OR GRADE BEAM
PRE-MANUFACTURED
SHEAR PANEL (B)
PLYWOOD SHEATHING
OPNG.
1/S0.24
9/S0.23
CEILING JOIST SPANSIZE @ XX"O.C.
(E) CONCRETE SLAB, V.I.F.
TENSION STRAP
PER KEY NOTES
9/S0.23
4" THK. CONCRETE SLAB ON GRADE
W/ #4 @ 16" O.C. E/W, PROVIDE
CONTROL JOINTS @ 15'-0" O.C.
MAX., SEE
(E) STRUCTURAL STUD WALL
(E) HEADER, V.I.F.
(E) OPNG.
2/S0.22
(E) STRUCTURAL STUD WALL (B)
HDR.
KEY NOTES:
1 STRUCTURAL SHEATHING
2 SIMPSON HOLDOWN REQUIRED AT EACH END OF SHEAR WALL. U.O.N. HOLDOWN POST TO
RECEIVE EDGE NAILING. SEE DETAIL
2A HDU4 W/ 6x6 POST
1A 1/2" PLYWOOD SHEATHING INSTALLED OVER (E) STRAIGHT SHEATHING W/ 10d NAILS @ 6" O.C.
(B.N. & E.N.) & 12" O.C. F.N., UNBLOCKED, SEE DETAIL
3/S0.24
2B HDU5 W/ 6x6 POST
3 4x12 OR 3 1/2 x 11 1/4 PSL DRAG BEAM W/ STRAPPING ALIGNING W/ SHEAR WALL BELOW
14/S0.24
5 CUT, SHORE, AND RECONNECT (E) ROOF TRUSSES TO NEW BEAM
6 LOCALLY REMOVE (E) FOUNDATIONS FOR NEW WORK, CONTRACTOR TO PROVIDE SHORING TO
(E) FRAMING AS REQ'D.
4A MST48
7 REPAIR LOCATIONS OF DAMAGED (E) WALL FRAMING, FULL SURVEY BY G.C. REQ'D., SEE DETAIL 7/S0.24
8 SISTER 2x6 STUDS TO (E) STUDS, ORIENT PERPENDICULAR TO (E) STUDS, SEE DETAIL 9/S0.23
9 REMOVE (E) ROOF TRUSSES FOR ROOF HATCH, REFRAME W/ LVL ROOF JOISTS PER PLAN
10 WOOD BEAM TO WOOD BEAM CONNECTION, PROVIDE HUS410 HANGER.
4B CONT. CS14
11 PROVIDE SIMPSON H8 EA. END OF ROOF JOIST AT SUPPORTS FOR EXTENT AS SHOWN ON PLAN.
SEE FOR CLARITY
4C CMST12
12 PROVIDE 4x4 WOOD POST FOR GATE CONNECTION, S.A.D, CONNECT POST TO (E) FRAMING SIM.
TO .7/S0.23
13 ALL FOUNDATION EXCAVATIONS MUST BE OBSERVED AND APPROVED BY THE GEOTECHNICAL
ENGINEER PRIOR TO PLACEMENT OF REINFORCING STEEL
14 PILE FOOTINGS PER DET. REQ'D. FOR SITE LIGHT FIXTURES, S.A.D.8/S0.22
1/S2.02
4 SIMPSON STRAP OVER WOOD FRAMING PER PLAN
FOUNDATION SHEET NOTES:
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND NOTIFY STRUCTURAL
ENGINEER OF ANY DISCREPANCIES.
2. NOMINAL TOP OF SLAB ELEVATION = 0'-0". ELEVATIONS ARE GIVEN RELATIVE TO GROUND FLOOR
NOMINAL ELEVATION OF 0'-0"
3. FOR TYPICAL FOUNDATION DETAILS, SEE S02.X SERIES.
FOR TYPICAL WSWH DETAILS, SEE S0.31.
4. BOTTOM OF ALL NEW FOUNDATIONS TO BE -5'-0" TYP. PER GEOTECH. REPORT, SEE
5. VERIFY DEPTH OF ALL EXISTING FOUNDATIONS BEFORE EXCAVATING. BOTTOM OF (N)
FOUNDATIONS TO BE SET A MINIMUM OF A 1:1 SLOPE AWAY FROM BOTTOM OF (E) FOUNDATIONS
TO AVOID SURCHARGE OF (E) FOUNDATIONS, U.O.N. PROVIDE UNDERPINNING IF NEEDED, REFER TO
GEOTECHNICAL REPORT FOR ADDITIONAL REQUIREMENTS.
6. ALL FOUNDATIONS ARE CENTERED ABOUT POST/WALL CENTERLINES, U.O.N.
7. SEE ARCHITECTURAL DRAWINGS FOR EDGE OF SLAB DIMENSIONS, LOCATIONS OF DRAINS, CURBS,
PLANTERS, BOLLARDS, SLOPES, AND CONTOURS OF AREAS SLOPED TO DRAIN NOT SHOWN.
FRAMING SHEET NOTES:
1. ALL FRAMING IS NEW UNLESS OTHERWISE NOTED AS EXISTING (E).
2. ALL EXISTING FRAMING, CONDITIONS, AND DIMENSIONS TO BE VERIFIED IN FIELD BY CONTRACTOR.
EXISTING CONDITIONS SHOWN ARE BASED ON AVAILABLE BUILDING DOCUMENTS AND FIELD
OBSERVATIONS. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD AND NOTIFY
STRUCTURAL ENGINEER OF RECORD WHERE DISCREPANCIES EXIST.
3. CONTRACTOR TO SHORE ALL EXISTING ELEMENTS AS REQUIRED TO INSTALL NEW STRUCTURE.
4. SHEAR WALL SHEATHING TO BE INSTALLED ON INTERIOR SIDE OF (E) WALLS, TYP.
5. ALL NEW STRUCTURAL WALLS SHALL BE 2x6 STUDS @ 16" O.C. MIN., U.O.N. S.A.D FOR LOCATIONS
OF NEW WALLS.
6. ALL NEW NON-STRUCTURAL WALLS SHALL BE 2x4 STUDS @ 16" O.C. MIN., S.A.D FOR WALL
THICKNESS AND LOCATIONS OF NEW WALLS.
7. SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR SLEEVES,
BLOCK-OUTS, HOUSEKEEPING PADS, AND OTHER ITEMS TO BE COORDINATED WITH THE
STRUCTURAL DRAWINGS.
8. ALL WOOD ELEMENTS IN CONTACT WITH WEATHER OR CONCRETE SHALL BE P.T. D.F., TYP.
9. REPLACE ALL DETERIORATED OR DAMAGED WOOD MEMBERS IN KIND, TYP.
10. PROVIDE NAILING AS REQUIRED AT (E) WOOD CONNECTIONS TO MEET CBC MINIMUMS PER DET.
SHEET NOTES:
1/S0.23
4/S0.22
BOT. REINF.
(4) #5, E/W
DIMENSIONS
F-25
MARK
CONCRETE FOOTING SCHEDULE
3'-0" SQ. x 18" THK.F-30
2'-6" SQ. x 18" THK.
TOP REINF.
---
2'-0" WIDE x 18" THK.SF-2 (4) #5 + #4 TIES @ 12" O.C. (4) #5
2'-0" WIDE x 24" THK.SF-2A (5) #5 + #4 TIES @ 12" O.C. (5) #5
(5) #5, E/W ---
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
2/
2
5
/
2
0
2
5
1
:
5
6
:
0
7
P
M
S1.01
FOUNDATION &
FIRST FLOOR
FRAMING PLAN
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S1.01 1/4" = 1'-0"
1 FOUNDATION & FIRST FLOOR FRAMING PLAN
N
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
2024-01-15
W1895-88-01
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
1
2
3
A B C D E F
25
'
-
0
"
15
'
-
8
"
18' - 6"23' - 7"22' - 6"18' - 0"7' - 1"
89' - 8"
40
'
-
8
"
5
1
/
4
x
1
4
P
S
L
4x10 DF#1
1ATYP. FULL ROOF
(E) 2x4 CLG. JOISTS
@ 24" O.C.(E
)
D
B
L
.
T
R
U
S
S
A
T
R
I
D
G
E
(E) 2x6 RAFTERS
@ 24" O.C.
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
(
H
I
G
H
)
1
3
/
4
x
1
4
L
V
L
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
(2
)
2
x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
1
3
/
4
x
1
4
L
V
L
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
2x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
(
H
I
G
H
)
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
1
3
/
4
x
1
4
L
V
L
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
2x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
(E) HIP(E) H
I
P
(E) H
I
P
(E) HIP
3
HDR. HDR.HDR.
HDR.
1
3
/
4
x
1
4
L
V
L
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
(2
)
2
x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
5
3
(E
)
2
x
6
R
A
F
T
E
R
S
@
2
4
"
O
.
C
.
(E) 2x6 RAFTERS
@ 24" O.C.
(E
)
2
x
6
R
A
F
T
E
R
S
@
2
4
"
O
.
C
.
(E) 2x4 CLG. JOISTS
@ 16" O.C.
5
3
4A
4B
4C
4C
4A
4B
HDR.
HDR.HDR.
CONNECT (E) TRUSSES TO
(E) WALL, SEE FRAMING
SHEET NOTE 10, TYP.
1
S2.02
2
S2.02
2
S2.02
1
S2.02
1 3/4x14 LVL
1
3
/
4
x
1
4
L
V
L
9
S2.02
6
1'
-
0
"
4x10 DF#1
10
4
S2.02
2x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
16
S2.02
3'
-
0
"
10' - 0"
11
7
S2.02
8
S2.02
9
S2.02
4B
4B
6x
1
0
CL
G
.
B
M
.
6x
1
0
C
L
G
.
B
M
.
4x
4
P
O
S
T
CL
G
.
T
O
R
O
O
F
4x
4
P
O
S
T
CL
G
.
T
O
R
O
O
F
2x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
6
(E) 2x6 RAFTERS
@ 24" O.C.
10
10' - 0"
11
(2
)
2
x
1
0
2x10
2x10
(2
)
2
x
1
0
CEILING HATCH,
S.A.D. FOR SIZE
& LOCATION
3'
-
0
"
AT
CEILING
4BAT
ROOF
3
AT
CEILING
DRAG BEAM TO SHEAR
WALL CONNECTION
SEE DET.
AND
4B
4x
1
2
C
O
N
T
.
L
E
D
G
E
R
5
S2.02
5
S2.02
13
S2.02
11
S2.02
16/S0.24
16/S2.02
S2.02
10
LEGEND:
STRUCTURAL STUD WALL
CONC. FOOTING
OR GRADE BEAM
SW
SHEAR WALL SHTG.
S.W. MARK, SEE SCH.
MIN. LENGTH
JOIST OR TRUSS SPAN
WD. OR STL. BEAM
NON-STRUCTURAL WALL, S.A.D.,
MIN. 2x4 @ 16" O.C. FOR NON-LOAD
BEARING WALLS, SEE DETAIL
STRUCTURAL WALL (B)
SIMP. 'HDU' HOLDOWN
PER KEY NOTES
HEADER, SEE DET.
X
SIZE @ XX"O.C.
X'-XX"
WD. COLUMN (B)
WD. COLUMN
C1
PRE-MANUFACTURED
SHEAR PANEL, SEE S0.31
(E) CONC. FOOTING
OR GRADE BEAM
PRE-MANUFACTURED
SHEAR PANEL (B)
PLYWOOD SHEATHING
OPNG.
1/S0.24
9/S0.23
CEILING JOIST SPANSIZE @ XX"O.C.
(E) CONCRETE SLAB, V.I.F.
TENSION STRAP
PER KEY NOTES
9/S0.23
4" THK. CONCRETE SLAB ON GRADE
W/ #4 @ 16" O.C. E/W, PROVIDE
CONTROL JOINTS @ 15'-0" O.C.
MAX., SEE
(E) STRUCTURAL STUD WALL
(E) HEADER, V.I.F.
(E) OPNG.
2/S0.22
(E) STRUCTURAL STUD WALL (B)
HDR.
KEY NOTES:
1 STRUCTURAL SHEATHING
2 SIMPSON HOLDOWN REQUIRED AT EACH END OF SHEAR WALL. U.O.N. HOLDOWN POST TO
RECEIVE EDGE NAILING. SEE DETAIL
2A HDU4 W/ 6x6 POST
1A 1/2" PLYWOOD SHEATHING INSTALLED OVER (E) STRAIGHT SHEATHING W/ 10d NAILS @ 6" O.C.
(B.N. & E.N.) & 12" O.C. F.N., UNBLOCKED, SEE DETAIL
3/S0.24
2B HDU5 W/ 6x6 POST
3 4x12 OR 3 1/2 x 11 1/4 PSL DRAG BEAM W/ STRAPPING ALIGNING W/ SHEAR WALL BELOW
14/S0.24
5 CUT, SHORE, AND RECONNECT (E) ROOF TRUSSES TO NEW BEAM
6 LOCALLY REMOVE (E) FOUNDATIONS FOR NEW WORK, CONTRACTOR TO PROVIDE SHORING TO
(E) FRAMING AS REQ'D.
4A MST48
7 REPAIR LOCATIONS OF DAMAGED (E) WALL FRAMING, FULL SURVEY BY G.C. REQ'D., SEE DETAIL 7/S0.24
8 SISTER 2x6 STUDS TO (E) STUDS, ORIENT PERPENDICULAR TO (E) STUDS, SEE DETAIL 9/S0.23
9 REMOVE (E) ROOF TRUSSES FOR ROOF HATCH, REFRAME W/ LVL ROOF JOISTS PER PLAN
10 WOOD BEAM TO WOOD BEAM CONNECTION, PROVIDE HUS410 HANGER.
4B CONT. CS14
11 PROVIDE SIMPSON H8 EA. END OF ROOF JOIST AT SUPPORTS FOR EXTENT AS SHOWN ON PLAN.
SEE FOR CLARITY
4C CMST12
12 PROVIDE 4x4 WOOD POST FOR GATE CONNECTION, S.A.D, CONNECT POST TO (E) FRAMING SIM.
TO .7/S0.23
13 ALL FOUNDATION EXCAVATIONS MUST BE OBSERVED AND APPROVED BY THE GEOTECHNICAL
ENGINEER PRIOR TO PLACEMENT OF REINFORCING STEEL
14 PILE FOOTINGS PER DET. REQ'D. FOR SITE LIGHT FIXTURES, S.A.D.8/S0.22
1/S2.02
4 SIMPSON STRAP OVER WOOD FRAMING PER PLAN
FOUNDATION SHEET NOTES:
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND NOTIFY STRUCTURAL
ENGINEER OF ANY DISCREPANCIES.
2. NOMINAL TOP OF SLAB ELEVATION = 0'-0". ELEVATIONS ARE GIVEN RELATIVE TO GROUND FLOOR
NOMINAL ELEVATION OF 0'-0"
3. FOR TYPICAL FOUNDATION DETAILS, SEE S02.X SERIES.
FOR TYPICAL WSWH DETAILS, SEE S0.31.
4. BOTTOM OF ALL NEW FOUNDATIONS TO BE -5'-0" TYP. PER GEOTECH. REPORT, SEE
5. VERIFY DEPTH OF ALL EXISTING FOUNDATIONS BEFORE EXCAVATING. BOTTOM OF (N)
FOUNDATIONS TO BE SET A MINIMUM OF A 1:1 SLOPE AWAY FROM BOTTOM OF (E) FOUNDATIONS
TO AVOID SURCHARGE OF (E) FOUNDATIONS, U.O.N. PROVIDE UNDERPINNING IF NEEDED, REFER TO
GEOTECHNICAL REPORT FOR ADDITIONAL REQUIREMENTS.
6. ALL FOUNDATIONS ARE CENTERED ABOUT POST/WALL CENTERLINES, U.O.N.
7. SEE ARCHITECTURAL DRAWINGS FOR EDGE OF SLAB DIMENSIONS, LOCATIONS OF DRAINS, CURBS,
PLANTERS, BOLLARDS, SLOPES, AND CONTOURS OF AREAS SLOPED TO DRAIN NOT SHOWN.
FRAMING SHEET NOTES:
1. ALL FRAMING IS NEW UNLESS OTHERWISE NOTED AS EXISTING (E).
2. ALL EXISTING FRAMING, CONDITIONS, AND DIMENSIONS TO BE VERIFIED IN FIELD BY CONTRACTOR.
EXISTING CONDITIONS SHOWN ARE BASED ON AVAILABLE BUILDING DOCUMENTS AND FIELD
OBSERVATIONS. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS IN FIELD AND NOTIFY
STRUCTURAL ENGINEER OF RECORD WHERE DISCREPANCIES EXIST.
3. CONTRACTOR TO SHORE ALL EXISTING ELEMENTS AS REQUIRED TO INSTALL NEW STRUCTURE.
4. SHEAR WALL SHEATHING TO BE INSTALLED ON INTERIOR SIDE OF (E) WALLS, TYP.
5. ALL NEW STRUCTURAL WALLS SHALL BE 2x6 STUDS @ 16" O.C. MIN., U.O.N. S.A.D FOR LOCATIONS
OF NEW WALLS.
6. ALL NEW NON-STRUCTURAL WALLS SHALL BE 2x4 STUDS @ 16" O.C. MIN., S.A.D FOR WALL
THICKNESS AND LOCATIONS OF NEW WALLS.
7. SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR SLEEVES,
BLOCK-OUTS, HOUSEKEEPING PADS, AND OTHER ITEMS TO BE COORDINATED WITH THE
STRUCTURAL DRAWINGS.
8. ALL WOOD ELEMENTS IN CONTACT WITH WEATHER OR CONCRETE SHALL BE P.T. D.F., TYP.
9. REPLACE ALL DETERIORATED OR DAMAGED WOOD MEMBERS IN KIND, TYP.
10. PROVIDE NAILING AS REQUIRED AT (E) WOOD CONNECTIONS TO MEET CBC MINIMUMS PER DET.
SHEET NOTES:
1/S0.23
4/S0.22
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
2/
2
5
/
2
0
2
5
1
:
5
6
:
1
0
P
M
S1.02
ROOF FRAMING
PLAN
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S1.02 1/4" = 1'-0"
1 ROOF FRAMING PLAN
N
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
FOOTING & REINF.
PER PLAN
(E) FTG. TO BE
REMOVED AT NEW
SHEAR WALL FTG.
(LOCALLY UNDERPIN
AS REQ'D ADJACENT
TO STRIP FTG.,
SEE
SHEAR WALL SHTG. PER
PLAN TO BE PLACED ON
INSIDE FACE OF WALL &
NAILED TO FRMG. PER SCH.
(E) CONC.
S.O.G., V.I.F.
(E) STUD WALL, V.I.F.
CONDITION OF STUDS
& BOT. PL & REPLACE
IF DETERIORATED
A.B. PER S.W. SCH.
IF REUSING (E) BOT. PL,
DRILL THRU PL &
PLACE ANCHORS
BEFORE POURING FTG.
E.N.
#4 @ 12" O.C. DOWELS
INTO (E) S.O.G., SEE
3/S0.22
PER PLAN
PE
R
P
L
A
N
MI
N
.
3"
C
L
R
.
STEM WALL PER 4/S0.22
2/S2.01
FOOTING & REINF.
PER PLAN
(E) STRIP FTG., V.I.F.,
MIN. DEPTH ASSUMED 1'-6"
SHEAR WALL
PER PLAN & TYP.
DETAILS
(E) CONC. S.O.G.
(E) STUD WALL, V.I.F.
A.B. PER S.W. SCH.
HD PER PLANPOST PER PLAN
HD ANCHOR & ADD'L
REINF. PER 3/S0.24
S.O.G. OVER
STEM WALL
DOWELS TO MATCH SIZE &
SPACING OF FTG. & STEM
WALL REBAR, DRILL & EPOXY
TO (E) FTG. W/ 6" EMB., TYP.,
DO NOT DAMAGE (E) REBAR
MI
N
.
5"
ROUGHEN (E) CONC.
SURFACE TO 1/4"
AMPLITUDE TYP.
MIN.
3"
MIN.
1' - 0"
STEM WALL
PER
VERT. REBAR
NOT SHOWN
FOR CLARITY
4/S0.22
UNDERPIN (E) FTGS. AFFECTED
BY TEMP. EXCAVATIONS TO
DEPTH OF (N) FTGS. W/ MIN.
2500 PSI CONC. (UNDERPINNING
SEQUENCE BY OTHERS)
Ls
WSWH PANEL
PER PLAN
NOTE:
1. SEE TYPICAL WSWH DETAILS FOR INFO NOT SHOWN.
HAIRPINS PER
@ 4" O.C. IN STEM WALL
V.
I
.
F
.
4"
M
I
N
.
,
TY
P
.
3"
C
L
R
.
,
Le
CONCRETE STRIP
FTG. PER PLAN
Ls
CHIP (E) S.O.G.
& EXPOSE (E)
REINF.
(E) CONC. S.O.G.
1/S0.31
PROVIDE (2) ADD'L.
CLOSED #4 TIES
E/S OF ANCHOR
STEM WALL
PER
HORIZ. REBAR
NOT SHOWN
FOR CLARITY
4/S0.22
TEMP. EXCAVATIONS
TO BE MADE PER
THE GEOTECH.
REPORT, TYP.
S.O.G. PER PLAN
(REINF. NOT SHOWN
FOR CLARITY)1' - 0"
CAST WSWH ANCHOR
BOLTS INTO FTG. &
STEM WALL. EXTEND W/
COUPLERS AS REQ'D
PER 7/S0.31
1' - 0"
BACKFILL & COMPACT
SOIL BELOW SLAB ON
GRADE PER GEOTECH.
REPORT
POST PER PLAN
3x BOTTOM PLATE W/
(2) ANCHOR BOLTS,
SEE 6/S0.23
(E) STUD WALL,
WHERE OCCURS
PROVIDE (N) FRMG. PER .
REMOVE (E) FRMG. AT FTG.,
9/S0.23
CONCRETE PAD FOOTING
PER PLAN
ROUGHEN (E)
CONCRETE
SURFACE TO 1/4"
AMPLITUDE, TYP.
PER PLAN
DRILL AND EPOXY
DOWELS TO MATCH
STEM WALL REBAR
INTO (E) FTG. &
UNDERPINNING
W/ 6" EMB., TYP.
REPLACE S.O.G. REMOVED
FOR EXCAVATION,
SEE
STEM WALL
PER
REBAR NOT SHOWN
FOR CLARITY
4/S0.22
UNDERPIN (E) FTGS. AFFECTED
BY TEMP. EXCAVATIONS TO
DEPTH OF (N) FTGS. W/ MIN.
2500 PSI CONC. (UNDERPINNING
SEQUENCE BY OTHERS)
DRILL AND EPOXY
(2) #5 DOWELS @ 6" O.C.
INTO UNDERPINNING
W/ 6" EMB., TYP.
2/S0.22
PE
R
P
L
A
N
SLAB REINF. PER PLAN
SEE FOR
CONNECTION TO (E)
S.O.G.
(E) CONCRETE S.O.G.CONCRETE S.O.G.
PER PLAN
3/S0.22
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
1" = 1'-0"
2/
2
5
/
2
0
2
5
1
:
5
6
:
1
1
P
M
S2.01
FOUNDATION &
FIRST FLOOR
DETAILS
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S2.01 1" = 1'-0"
1 PERIMETER FTG. AT SHEAR WALL
S2.01 1" = 1'-0"
2 STRIP FTG. TO (E) STRIP FTG.
S2.01 1" = 1'-0"
3 WSWH-STRIP FTG. CONNECTION
S2.01 1" = 1'-0"
4 PAD FOOTING AT (E) STRIP FOOTING
S2.01 1" = 1'-0"
5 SLAB DEPRESSION AT (E) S.O.G.
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
A
A
(E) LEDGER TO BE
REMOVED V.I.F.
3x BLKG. ATTACH TO
EACH ROOF JOIST
WITH A35 CLIP TYP.,
NOTCH AT (E) TRUSS,
TYP.
ROOF JOIST PER PLAN
(E) TRUSS TOP CHORD
BEYOND, V.I.F.
(E) STRAIGHT
SHEATHING, V.I.F.
PLYWOOD SHEATHING
PER PLAN
B.N.
CONT. TENSION
STRAP PER PLAN
(E) PARAPET, V.I.F.
(E) WALL SHEATHING
V.I.F.
RESUPPORT (E) TRUSS TOP
CHORD W/ 3x4 LEDGER
SPANNING BETWEEN
ADJACENT (E) STUDS.
ATTACH TO (E) STUDS WITH
(2) #14 WOOD SCREWS E/E,
RESUPPORT BEFORE
REMOVING (E) LEDGER
SIMPSON H2.5A EA.
JOIST-LEDGER
TYP., U.O.N.
CEILING JOIST PER PLAN
(E) TRUSS BOT. CHORD
BEYOND, V.I.F.
(E) LEDGER, V.I.F.
ALIGN CEILING JOISTS
WITH (E) STUD AND
BOT. TRUSS CHORD,
BEAR ON (E) LEDGER
AND PROVIDE (3) 10d
NAILS INTO STUD
3x4 LEDGER BETWEEN
ADJACENT STUDS TO
SUPPORT ROOF JOIST.
AT E/E BEAR ON 2x4
CRIPPLE STUD x 12"
ATTACHED TO (E)
STUDS W/ (3) SIMP.
SDWS22300 SCREWS
MAX. 2 1/2" WIDE x 1"
DEEP NOTCH AT
LEDGER
(E) TOP PL. V.I.F.
B.N.
B.N.
A35 CLIPS BETWEEN
LEDGER AND SHTG.
PER SW SCHEDULE
SHEAR WALL PER PLAN,
ATTACH SHEATHING TO
(E) STUDS, TYP.E.N.
3x BLKG. AT ALL PANEL
JOINTS SEE 2/S0.24
NOTCH SHTG. AROUND
TRUSS BOT. CHORD AND
CEILING JOISTS. PROVIDE
3x BLKG AT ALL PANEL
JOINTS.
SECTION A-A
E.N., TYP.
SHEATHING PANELS
PER S.W. SCHEDULE
3x BLOCKING AT
PANEL JOINTS W/
SHTG. E.N. WHERE
NOT ALIGNED W/
AN (E) STUD
SHEATHING
NOTCH AROUND
FRAMING, TYP.
CONT. SIMP. CS16
STRAP ABOVE & BELOW
OPENINGS IN WALL
(E) TOP PL. V.I.F.
S.W. SHEATHING PER
PLAN & TYP. DETAILS
ON S.024
CEILING AT (E) TRUSS
BOT. CHORD, S.A.D.
CEILING
VOID
ROOF
S.A.D.
S.W. END POST W/
E.N. PER PLAN
2x STUDS ALIGNED W/
(E) TRUSS BOT. CHORD
WALL FRAMING PER 9/S0.23
2x CRIPPLE STUDS
BETWEEN (E) TRUSS
T&B CHORDS
CONT. DBL. PLATE
UNDER ROOF JOISTS
ALIGN ALT. STUDS
UNDER ROOF JOISTS
3x BLOCKING MATCHING
DEPTH OF ROOF JOISTS,
NOTCH AT (E) TRUSS
TOP CHORDS, TYP.,
ATTCH TO EACH JOIST
W/ A35 CLIP E/E
SIMPSON LTP4 CLIPS,
SEE S.W. SCH.
FOR SPACING 1/S0.24
3x BLOCKING, TYP.,
MATCHING DEPTH OF
TRUSS TOP CHORD,
ATTACH TO TRUSS W/
A34 CLIP E/E
CEILING JOIST
PER PLAN, ALIGN
W/ (E) TRUSS BOT.
CHORD, TYP.
NOTCH SHEATHING
AROUND CEILING
JOIST AND TRUSS
BOT. CHORD, PROVIDE
3x BLOCKING AROUND
NOTCH W/ EDGE
NAILING, SEE SECTION
A-A ON 2/S2.02
CONT. STRAP
PER PLAN
CONT. SIMP. CS16
STRAP ABOVE & BELOW
OPENINGS IN WALL
TRIM (E) BOT. CHORD
OVERHANG
WOOD BEAM PER PLAN
ROOF JOIST SPLICE AT
STUD WALL, PROVIDE
SIMPSON H2.5A AT EA.
JOIST TO TOP PLATE
2x CRIPPLE STUD
WALL PER 9/S0.23
LOAD BEARING WALLS
TO BE REMOVED, S.A.D.
HANG (E) TRUSS OFF
WOOD BEAM, PROVIDE
HUS26-2 HANGER TO
SUPPORT BOT. CHORD
AND WEB, V.I.F. REQ'D.
HANGER SIZE
16d @ 16" O.C.
HANGER, SEE
SCHEDULE ON 8/S0.23
3x BLKG., RIP TO
ROOF SLOPE, TYP.
B.N.
PROVIDE 2x6
TRUSS VERT. W/
(4) 10d NAILS TO
(E) T&B CHORDS
SIMP. AS2046A TRUSS PLATE
(20 GA. MIN.) NAILED TO BOT.
CHORD, VERT. & DIAG.
PROVIDE INFILL 2x PIECE
AS REQ'D FOR EVEN
NAILING SURFACE
(E) 2x STUD WALL, V.I.F.
CONTRACTOR TO
VERIFY (E) FRAMING
CONNECTIONS &
PROVIDE THE CBC
MINIMUMS PER
IF (E) IS INSUFFICIENT
ROOF JOIST SPLICE AT
STUD WALL, PROVIDE
SIMPSON H2.5A AT EA.
JOIST TO TOP PLATE
MAX. 1/2" BIRDSMOUTH TO
JOIST AT (E) TOP PLATE
CEILING JOISTS PER PLAN,
BEAR ON (E) STUD WALL
1/S0.23
3x BLKG., RIP TO
ROOF SLOPE, TYP.
B.N.
2x BLKG. BTWN.
CEILING JOISTS, TYP.
BM. PER PLAN BEYOND
W/ HANGER PER PLAN
BM. PER PLAN
SIMP. CCQ POST CAP
POST PER PLAN
NOTE:
1. BALANCE OF FRAMING NOT SHOWN FOR CLARITY
2. FOR MEP OPENINGS IN SHEAR WALL, SEE DET.
POST PER PLAN W/
SIMP. CS14 STRAP
CONNECTED TO BM.
15/S0.24
CEILING EL.
S.A.D.
B.N., TYP.
DRAG BM. PER PLAN
PROVIDE (2) BAYS
OF 3x BLKG.
BEYOND DRAG BM.
W/ EDGE NAILING
SHEAR WALL,
SEE PLAN AND TYP.
DETS. ON S0.23
STRAP PER PLAN,
CNTR. ON END OF
SHEAR WALL
SHORE (E) STUDS, CUT
& RECONNECT TO HDR.
AFTER INSTALLATION
NOTES:
1. OCCURS EACH END OF OPENING, TYP.
2. SEE FOR INFORMATION NOT SHOWN
PROVIDE JACK STUD
ATTACHED TO (E) STUD,
SEE 9/S0.23
9/S0.23
HDR. PER PLAN,
EXTEND TO ADJACENT
FULL HEIGHT STUD
OPNG., S.A.D.
PROVIDE INFILL STUD AS
REQ'D TO FRAME OPNG.
(E) STUDS TO BE
REMOVED
3x FLAT BLKG. AT
ATTACHMENT POINTS,
COORDINATE W/ MANUF.
(E) WALL STUDS, V.I.F.,
SISTER FULL-HEIGHT W/
3x6 OR (2) 2x6 ATTACHED
W/ 16d NAILS @ 12" O.C.
WHERE STUDS SUPPORT
MEP UNIT
WALL-MOUNTED MEP
UNIT, S.M.D. (EXTENT
SHOWN INDICATIVELY)
2x CRIPPLE STUDS
UNDER E/E OF BLKG.,
TYP.
B.N.
E.N.
SW
DRAG BM. PER PLAN
BLKG., SHAPE AS REQ'D
TO ATTACH SHTG.
SHORE (E) RAFTERS,
REMOVE (E) TRUSS &
RECONNECT TO BM.
W/ SIMP. H2.5A CLIP
LTP4 CLIPS PER S.W.
SCH. FROM BLKG. TO BM.
PER
PLAN
A35 SHEAR TRANSFER
CONN. PER S.W.
SCHEDULE ON S0.24
E.N.
SWPER
PLAN
(E) PARAPET & TOP PL.
V.I.F.
CONT. LEDGER PER
PLAN, NAIL TO EA. (E)
STUD WITH (3)
SDWS22500 SCREWS,
EQUALLY SPACED.
SHORE & REMOVE (E)
END TRUSS OR
LEDGER TO INSTALL
LEDGER. GC TO
PROVIDE SHORING AS
REQD.
3x BLKG. AT SHTG.
PANEL JOINTS SEE
DET.
(E) WALL TOP PL. AT
TRUSS BOTTOM
CHORD V.I.F.
ROOF SHTG. PER PLAN
OVER (E) STRAIGHT
SHTG. V.I.F.
B.N.
2/S0.24
(E) TRUSS V.I.F.
SW
8"
8"
STRAP PER PLAN
(E) RAFTERS V.I.F.
4x BLKG. BETWEEN
(E) RAFTERS
INFILL SHEAR WALL
BETWEEN ROOF AND
DRAG BEAM WITH 1/2"
SHEATHING & 6" O.C.
E.N. & F.N.
LTP4 CLIPS T&B OF S.W.
SPACED SEE DET.
FOR 6" E.N.
DRAG BEAM PER PLAN
CONNECT DRAG BM. TO
STRONG-WALL PER
4/S0.31 TYP. AT (2)
LOCATIONS
SIMPSON STRONG-
WALL PER PLAN
SIMPSON CS14 STRAP
SPLICING SHEAR
WALL AND STRONG
WALL BELOW.
CUT & RESUPPORT (E)
CEILING JOISTS TO
DRAG BEAM SEE DET.
2/S0.24
8/S0.23
E.N.
E.N.
SW
CEILING ELEV.
S.A.D.
B.N.
(E) HIP RAFTER.
SISTER WITH 2x
MEMBER MATCHING
DEPTH OF RAFTER
W/SDWS22300x3" @12"
O.C. STAGGERED
(E) HIP RAFTERS
BEYOND V.I.F.
INFILL SHEAR WALL
BETWEEN ROOF AND
DRAG BEAM WITH 1/2"
SHEATHING & 6" O.C.
E.N. & F.N.
LTP4 CLIPS T&B OF
SPACED SEE DET.
FOR 6" E.N.
DRAG BEAM PER PLAN.
SHORE & REMOVE (E)
CEILING BEAM TO
INSTALL BM.
SPLICE DRAG BEAM
W/DRAG BEAM AT
STRONG WALLS W/
MSTC48 STRAP, SEE
PLAN
SHEAR WALL TOP PLS
MATCHED TO HIPPED
ROOF SLOPE
E.N.
2/S0.24
PLYWOOD SHEATHING
PER PLAN
E.N.
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
1" = 1'-0"
2/
2
5
/
2
0
2
5
1
:
5
6
:
1
2
P
M
S2.02
FRAMING DETAILS
23005.10
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
01/12/2024
IK
625 S. CYPRESS
S2.02 1" = 1'-0"
1 EXTERIOR WALL FRAMING SECTION
S2.02 1" = 1'-0"
2 EXTERIOR WALL FRAMING SECTION AT SHEAR
WALLS2.02 1" = 1'-0"
6 GRID 2 SHEAR WALL FRAMING
S2.02 1" = 1'-0"
4 FRAMING SUPPORT AT WOOD BEAM
S2.02 1" = 1'-0"
7 FRAMING SUPPORT AT BEARING WALL
S2.02 1" = 1'-0"
16 SHEAR WALL CONNECTION TO ROOF AND DRAG
BEAM
S2.02 1" = 1'-0"
8 OPENING IN (E) BEARING WALL
S2.02 1" = 1'-0"
10 WALL MOUNTED MEP UNIT SUPPORT
S2.02 1" = 1'-0"
9 SHEAR WALL AT HIP ROOF
S2.02 1" = 1'-0"
11 SHEAR WALL TRANSFER - ROOF MEMBERS
PARALLEL
No. Description Date
1 100% DD ISSUANCE 01/12/2024
2 75% CD ISSUANCE 03/15/2024
3 90% CD ISSUANCE 05/03/2024
4 PERMIT SET 05/17/2024
5 BACKCHECK SET 01/17/2025
S2.02 1" = 1'-0"
5 INFILL SHEAR WALL CONNECTION TO SIMPSON
STRONG WALLS2.02 1" = 1'-0"
13 INFILL SHEAR WALL AT HIP ROOF
EXP. 03/31/26
No. C78947
STATEOF CA LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
DATE SIGNED
02/27/2025
6 2 BACKCHECK SETND 02/27/2025
N
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
BACKCHECK SET_V2 04/07/2025
SHEET INDEX:
SCALE: NONE
VICINITY MAP
ABBREVIATIONS:
GENERAL NOTES :CITY OF SANTA ANA GENERAL GRADING NOTES:
PROJECT INFORMATION:
·
·
·
·
·
TITLE SHEET
C0.00
W1895-88-01
2025-04-08
2025-04-08
TOPOGRAPHIC
SURVEY 1
C1.00NOT TO SCALE
FOR REFERENCE ONLY Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
TOPOGRAPHIC
SURVEY 2
C1.01NOT TO SCALE
FOR REFERENCE ONLY Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
OOOOOOOOOOOOOOOOOOO
OOOOOOOOOOOOOOOOOOOOO
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO OOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
OOOOOOOOOOOXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
N
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
BACKCHECK SET_V2 04/07/2025
LEGEND:
TESC KEY NOTES:
OOOOOOOOO
BMP NOTES:
TESC PLAN
C1.10
CITY OF SANTA ANA EROSION AND SEDIMENT
CONTROL NOTES:
X X X
CY
P
R
E
S
S
A
V
E
AL
L
E
Y
1033 SF
MULTI-PURPOSE
ROOM A
02
212 SF
ENTRY / CHECK
IN OFFICE
01 348 SF
MULTI-PURPOSE
ROOM B
03
HALLWAY
04
375 SF
MULTI-PURPOSE
ROOM C
05
HALLWAY
06
WOMENS
07
MENS
09
343 SF
OFFICE AND
KITCHEN
10
RESTROOM
11
JANITOR
12
SD SD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
W
SD SDSDSD
SD
PERF PERF PERF PERF PERF PERF PERF PERF PERF PERF
W W W W W W
W W W W W
SD
SD
SD
GB
GB
GB
GB
1
2
LEGEND:
SS SS
W W
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
BACKCHECK SET_V2 04/07/2025
GRADING GENERAL NOTES:
DRAINAGE GENERAL NOTES:GRADING AND DRAINAGE KEY NOTES:
N
GB
OH OH
GRADING AND
DRAINAGE
PLAN
C1.20
SD
PERF
W W
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
BACKCHECK SET_V2 04/07/2025
GRADING AND
DRAINAGE
SECTIONS PLAN
C1.21
1033 SF
MULTI-PURPOSE
ROOM A
02
212 SF
ENTRY / CHECK
IN OFFICE
01 348 SF
MULTI-PURPOSE
ROOM B
03
HALLWAY
04
375 SF
MULTI-PURPOSE
ROOM C
05
HALLWAY
06
WOMENS
07
MENS
09
343 SF
OFFICE AND
KITCHEN
10
RESTROOM
11
JANITOR
12
CY
P
R
E
S
S
A
V
E
1
////////////////////////////////////////////////////////////
11
+
5
0
.
0
0
SD SD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
W
SD SDSDSD
SD
PERF PERF PERF PERF PERF PERF PERF PERF PERF PERF
W W W W W W
W W W W W
SD
SD
SD
N
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
BACKCHECK SET_V2 04/07/2025
GENERAL CONSTRUCTION NOTES WATER CONSTRUCTION KEY NOTES
SEWER CONSTRUCTION KEY NOTES
W W
OH OH
W W
SS SS
LEGEND
UTILITY PLAN
C1.30
SD
PERF
///////////
CY
P
R
E
S
S
A
V
E
AL
L
E
Y
Xref .\Xref\SA Fire Station--Sheet - A1-00 - PROPOSED FLOOR PLAN-SA Fire Station_MEP_R23-rvt-1-FLOOR PLAN - NEW.dwg
1033 SF
MULTI-PURPOSE
ROOM A
02
212 SF
ENTRY / CHECK
IN OFFICE
01 348 SF
MULTI-PURPOSE
ROOM B
03
HALLWAY
04
375 SF
MULTI-PURPOSE
ROOM C
05
HALLWAY
06
WOMENS
07
MENS
09
343 SF
OFFICE AND
KITCHEN
10
RESTROOM
11
JANITOR
12
SD
SD SD SD SD SD SD SD SD
SDSD
PERF PERF PERF PERF PERF
W W
W W
SD
MATCHLINE - SEE BOTTOM LEFT
S
EAST CAMILE STREET
MATCHLINE - SEE TOP LEFT CY
P
R
E
S
S
A
V
E
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
BACKCHECK SET_V2 04/07/2025
N HORIZONTAL
CONTROL PLAN
C1.40
LEGEND:
SS SS
W W
OH OH
W W
SD
PERF
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
BACKCHECK SET_V2 04/07/2025
CIVIL DETAILS 1
C2.00
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
CIVIL DETAILS
C2.00
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
GF
625 S. CYPRESS
No.Description Date
DESIGN DEVELOPMENT 01/10/2024
AS SHOWN
75% CD 03/15/2024
90% CD 05/14/2024
PERMIT SET 05/17/2024
BACKCHECK SET_V2 04/07/2025
CIVIL DETAILS 2
C2.10
PE
R
G
E
O
T
E
C
H
R
E
P
O
R
T
3
1/
2
"
5
1/
4
"
CONCRETE PAVING WITH #4
REINFORCING BARS @ 16" O.C.
BOTH HORIZONTAL DIRECTIONS;
PROVIDE BROOM FINISH RAN
PERPENDICULAR TO PATH OF
TRAVEL TYP,. UNO.
FOR CONCRETE COLOR
SUB BASE, COMPACTED TO 95%
RELATIVE COMPACTION, REFER
TO GEOTECH REPORT
UNDISTURBED EARTH
NOTE:
FOR MORE INFORMATION, REFER TO GEOTECH REPORT.
EQ
EQ
AGGREGATE BASE
10
7/
8
"
3
5/
8
"
CONCRETE PAVING WITH #3
REINFORCING BARS @ 18" O.C.
BOTH HORIZONTAL DIRECTIONS;
PROVIDE BROOM FINISH RAN
PERPENDICULAR TO PATH OF
TRAVEL TYP,. UNO.
REFER TO LANDSCAPE
DRAWINGS FOR CONCRETE
COLOR
SUB BASE, COMPACTED TO 95%
RELATIVE COMPACTION AND
MOISTENED TO AT LEAST TWO
PERCENT ABOVE OPTIMUM
MOISTURE CONTENT, REFER TO
GEOTECH REPORT
UNDISTURBED EARTH
NOTE:
FOR MORE INFORMATION, REFER TO GEOTECH REPORT.
EQ
EQ
CONCRETE PAVING PER
PLAN, REFER TO
REINFORCEMENT PER
PAVING TYPE, REFER TO
PAVING DETAILS
3"
6"
6"
1
A5.02
5
A5.02
FACE OF BUILDING
SEALANT & EXPANSION
JOINT FILLER
1/4" RADIUS
3/8"
FLUSH TRANSITION
1/4" RADIUS
(E) CONCRETE
PAVING W/
SAWCUT EDGE
CONCRETE PAVING
PER PLAN, REFER TO
3/8"MAX.
#4 x 12" LONG EPOXY
DOWELS @ 18" O.C.
SEALANT & EXPANSION
JOINT FILLER; 1/4" MAX
BELOW FINISH PAVING
REINFORCEMENT PER
PAVING TYPE, REFER TO
PAVING DETAILS
3"
6"
6"
1
A5.02
5
A5.02
1/2" RADIUS
CONCRETE PAVING
PER PLAN, REFER TO
REINFORCEMENT PER
PAVING DETAILS
3"
6"
6"
1
A5.02
5
A5.02
3/
8
"
FINISH GRADE /
LANDSCAPING,
REFER TO CIVIL &
LANDSCAPE DWGS
2 1/4"
CLR.
CONCRETE PAVING
PER PLAN, REFER TO
SAWCUT JOINT PER PLAN,
SPACED AT INTERVALS NOT
GREATER THAN 10'
1
A5.02
5
A5.02
3/16
MI
N
I
M
U
M
O
F
1
/
4
T
H
E
SL
A
B
T
H
I
C
K
N
E
S
S
1.
2.
3.
4.
NOTES:
SCORING PER PLAN, CONTRACTOR TO PROVIDE SHOP DRAWING FOR APPROVAL.
ADJUST SCORE LINES TO ALIGN WITH BUILDING AND SITE ELEMENTS AS MUCH AS
POSSIBLE WHILE MAINTAINING DESIGN INTENT.
WHERE SAWCUT MEETS VERTICAL SURFACE, SAWCUT SHALL TERMINATE NO MORE THAN
1/2" FROM EDGE.
SAWCUT WITHIN 8 HOURS OF CONCRETE FINISH.
CONCRETE PAVING
PER PLAN, REFER TO
SCORE JOINT, 3/8" RADIUS x
1" DEEP
1
A5.02
5
A5.02
PLACEMENT 1PLACEMENT 2
1'-0"1'-0"
1.
2.
3.
NOTES:
INSTALL CONSTRUCTION JOINTS AS NECESSARY.
ALL OTHER NON CONSTRUCTION JOINT SCORING SHALL BE SAWCUT JOINT.
#4 SPEED DOWL AT 24" O.C.
ALL CONSTRUCTION JOINTS SHALL ALIGN WITH SCORING
SHOWN ON PLAN. CONTRACTOR SHALL COORDINATE
LOCATION OF CONSTRUCTION JOINTS AND SCORING PRIOR TO
POUR.
DATED 04/23/2024
PREPARED BY GEOCON
DATED 04/23/2024
PREPARED BY GEOCON
E0.00
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
GENERAL NOTES,
ABBREVIATIONS
AND SYMBOLS
UON UNLESS OTHERWISE NOTED
XFMR
WP
VL
WEATHERPROOF
TRANSFORMER
WATTS
VERIFY LOCATION
VOLTAGE
UL
U/G
TYP
TVSS
TS
TBB
SIM
SWB
SW
R
SCA
RGC
UNDER GROUND
UNDERWRITER'S LABORATORIES
TYPICAL
TELEPHONE BACKBOARD
TIME SWITCH
SIMILAR
SWITCHBOARD
SWITCH
EXISTING, TO BE REMOVED
RIGID GALVANIZED CONDUIT
SHORT CIRCUIT AMPERE
P
PL
PNL
(NR)
NIC
NL
NTS
N
MIN
NA
POLE
PROPERTY LINE
PANEL
NOT IN CONTRACT
NIGHT LIGHT
NOT TO SCALE
NOT APPLICABLE
NEW
MINIMUM
EWH ELECTRIC WATER HEATER
MC
MAX
MFR
IG
LTG
LTA
GND
IC
HP
GFCI
F
MECHANICAL CONTRACTOR
MANUFACTURERS
MAXIMUM
ISOLATED GROUND
LET-THRU AMPS FOR FUSES
LIGHTING
GROUND
HORSEPOWER
FUSE
EQ
EQP
(ER)
EA
EC
CO
(E)
(D)
CONN
CLG
CL
EXISTING, TO REMAIN
EQUIVALENT
EQUIPMENT
ELECTRICAL CONTRACTOR
EACH
CONDUIT ONLY
DEMOLISH
CONNECTED
CEILING
CENTER LINE
ABBREVIATIONS
CB
CKT
CATV
C
BR
BCW
AIC
AFF
A
COMMUNITY ANTENNA TELEVISION
CIRCUIT BREAKER
CIRCUIT
BARE COPPER WIRE
CONDUIT
BRANCH
AMPS INTERRUPTING CAPACITY
ABOVE FINISHED FLOOR
AMPERE
NEW FIRE STATION RENOVATION IN EXISTING CONSTRUCTION. ADDING NEW 400A, 120/240V, 1-PHASE,
3-WIRE SERVICE (NEW SCE METER). PROVIDE POWER (GENERAL AND MECHANICAL), LIGHTING AND
LIGHTING CONTROL.
SCOPE OF WORK:
-2022 CALIFORNIA ELECTRICAL CODE.
-2022CALIFORNIA MECHANICAL CODE.
-2022 CALIFORNIA ENERGY CODE.
-2022 CALIFORNIA FIRE CODE.
-2022 CALIFORNIA PLUMBING CODE.
-NFPA 99 STANDARDS APPLICABLE TO PROJECT.
-CITY OF SANTA ANA AMENDMENTS
EXISTING, TO BE
RELOCATED AS
SHOWN
GROUND FAULT
CIRCUIT INTERRUPTER
INTERRUPTING
CAPACITY (RMS SYM.)
APPLICABLE CODES:
INDICATES NEW LOCATION OF
RELOCATED DEVICE. PROVIDE
ADDITIONAL CONDUITS, WIRES,
BOXES, ETC. TO RE-ESTABLISH
CIRCUITRY AS BEFORE.
TRANSIENT VOLTAGE
SURGE SUPPRESSOR
OPEN STRIP FLUCRESCENT
EMERGENCY LIGHT FIXTURE WITH BATTERY PACK
FLUORESCENT LIGHT FIXTURE AS SPECIFIED
WALL WASHER LIGHT FIXTURE, ARROW DENOTES AIMING DIRECTION
JUNCTION BOX, SIZE AS NOTED AND PER CODE.
JUNCTION BOX WITH FLEXIBLE CONDUIT CONNECTED TO DEVICE OR EQUIPMENT.
DISCONNECT SWITCH, 30A, 3-POLE, NON-FUSED
WITH 1-1/4" C.O. AND PULL ROPE STUB UP TO NEAREST ACCESSIBLE CEILING SPACE.
CONDUIT TURNING UP
CONDUIT TURNING DOWN
DISCONNECT SWITCH, 60A, W/45A FUSE, 3-POLE (UON)
HOMERUN TO PANEL A CIRCUITS 1&3
CONDUIT EXPOSED
CONDUIT CONCEALED IN FLOOR SLAB OR UNDERGROUND
GROUND, PER CODE AND AS SPECIFIED
UTILITY METERING
CIRCUIT BREAKER, 150A, 3-POLE
TELEPHONE CONDUIT/HOMERUN, SIZE AS NOTED
SWITCH & FUSE, 100AS, 75 AF, TYPE AS NOTED, 3-POLE (UON)
SWITCHBOARD
LIGHT FIXTURE TYPE F1, 40W EACH, TYPICAL IN A ROOM OR AREA
FLUSH MOUNTED PANEL BOARD, B INDICATES NAME
SURFACE MOUNTED PANEL BOARD, A INDICATES NAME
REFERENCE NOTE #1
REFERENCE TO DETAIL #2 ON SHEET E2.0
OUTLET FOR TELEPHONE/DATA ONLY @+18" (UON) PROVIDE A 5S J-BOX WITH MUD RING AND
FLUSH MOUNTED DUPLEX RECEPTACLE OUTLET 250V 2P, 3W, 20A (NEMA 6-20R)
SYMBOLS
WALLFLOOR CEILING
DM a
OUTLET FOR WAP
HOMERUN TO PANEL A CIRCUITS 1&3 WITH GRAND WIRE
EXIT SIGN, SINGLE FACE, ARROW IF INDICATED DENOTES DIRECTION
SINGLE POLE TOGGLE SWITCH @+48"(UON), SUBSCRIPTS INDICATE THE FOLLOWING:
A - OUTLET 'A' CONTROLLED
DM - DIMMER,
RATING AS NOTED
M - MANUAL MOTOR STARTER
P - PILOT ON LIGHT
PULL ROPE STUB UP TO NEAREST ACCESSIBLE CEILING SPACE.
OUTLET FOR DATA ONLY @+18" (UON) PROVIDE A J-BOX WITH 1-1/4" C.O. AND
OUTLET FOR TELEPHONE ONLY @+18" (UON) PROVIDE A J-BOX WITH 1-1/4" C.O. AND
PULL ROPE STUB UP TO NEAREST ACCESSIBLE CEILING SPACE.
OUTLET FOR DATA ONLY PROVIDE A J-BOX, NUMBER INDICATES QUANTITY
OF THE JACKS IN THE SAME DATA OUTLET
REPRESENTS WITH SINGLE SWITCH; a,b REPRESENTS WITH DUAL SWITCHES
COMBINATION OF MOTOR STARTER AND CIRCUIT BREAKER, NEMA SIZE '1' (UON)
CONDUIT CONCEALED IN CEILING OR WALL, 3/4" CONDUIT, 2#12 WIRES (UON)
1
2
E2.0
OS
1.INFORMATION GIVEN ON THE DRAWINGS REGARDING EXISTING INSTALLATION HAS BEEN OBTAINED
FROM THE BEST SOURCES AVAILABLE. HOWEVER IT CANNOT BE GUARANTEED IN ALL RESPECTS.
VERIFY ALL SUCH INFORMATION BEFORE PROCEEDING WITH THE NEW WORK THAT MAY BE AFFECTED
UPON. INCLUDE AS A PART OF THE CONTRACT ALL WORK THAT ARE REQUIRED TO PRODUCE
INDICATED RESULT BEFORE SUBMITTING THE BID PROPOSAL.
2.THE SCOPE OF WORK SHALL INCLUDE THE FURNISHING OF ALL MATERIALS, EQUIPMENT, SUPPLIES AND
LABOR AND THE PERFORMANCE OF ALL OPERATIONS NECESSARY FOR THE INSTALLATION OF ALL
ELECTRICAL WORK, COMPLETE AND IN OPERATING CONDITION, ALL TO THE SATISFACTION OF
UNIVERSITY'S REPRESENTATIVE. THE ENTIRE INSTALLATION SHALL BE READY IN EVERY RESPECT FOR
SATISFACTORY AND EFFICIENT OPERATION WHEN COMPLETED.
3.PROVIDE ALL MATERIALS AND EQUIPMENT TO MAKE FINAL CONNECTIONS TO ALL EQUIPMENT AND
APPLIANCES.
4.NOTHING DESCRIBED HEREIN OR INDICATED ON THE DRAWINGS SHALL BE CONSTRUED TO PERMIT
WORK NOT CONFORMING TO THE MOST STRINGENT OF THE APPLICABLE CODES AND REGULATIONS.
5.ALL WORK SHALL BE DONE IN FULL COMPLIANCE WITH THE CALIFORNIA ELECTRICAL CODE, 2022
EDITION AND 2022 CALIFORNIA TITLE-24 ENERGY STANDARDS AND IN ACCORDANCE WITH THE
REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING JURISDICTION.
6.ALL EQUIPMENT AND MATERIALS SHALL BE NEW AND SHALL BE LISTED BY THE UNDERWRITER'S
LABORATORIES, MANUFACTURED IN FULL COMPLIANCE WITH ASME, ANSI, IEEE AND NEMA.
7.ELECTRICAL DRAWINGS ARE DIAGRAMMATIC. SIZES, LOCATION OF EQUIPMENT, AND WIRING ARE
SHOWN TO SCALE WHERE POSSIBLE, BUT MAY BE DISTORTED FOR CLARITY. FINAL LOCATIONS OF
OUTLETS AND EQUIPMENT SHALL BE ADJUSTED AS DICTATED BY EXISTING CONDITIONS. IT IS NOT
WITHIN THE SCOPE OF DRAWINGS TO SHOW ALL NECESSARY BENDS, OFFSETS, AND PULLBOXES. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL HIS WORK TO CONFORM TO THE
STRUCTURE. CONDUIT RUNS ARE INDICATED DIAGRAMMATICALLY, DETERMINE EXACT LOCATION IN THE
FIELD.
8.DURING THE PROGRESS OF THE WORK, MAKE A CAREFUL RECORD OF ALL CHANGES BY WHICH THE
ACTUAL INSTALLATION DIFFERS FROM THAT INDICATED ON THE CONTRACT DRAWINGS AND
DOCUMENTS.
9.ANY ERROR, OMISSION OR DESIGN DISCREPANCY ON THE CONSTRUCTION DOCUMENTS SHALL BE
BROUGHT TO THE ATTENTION OF UNIVERSITY'S REPRESENTATIVE FOR CLARIFICATION OR CORRECTION
PRIOR TO INSTALLATION.
10.THE WORD "VERIFY LOCATION" ABBREVIATED AS "V.L." SHALL MEAN TO COORDINATE THE EXACT
LOCATION OF THE DEVICE AND/OR EQUIPMENT BEING REFERRED TO WITH UNIVERSITY'S
REPRESENTATIVE AND TO PROVIDE NECESSARY ADJUSTMENT WITHOUT ANY EXTRA COST TO THE
UNIVERSITY.
11.CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, EQUIPMENT AND MATERIALS FOR A PERIOD OF
NOT LESS THAN ONE(1) YEAR FOR THE UNIVERSITY. SHOULD ANY DEFECTS OCCUR DURING THIS
PERIOD, THE CONTRACTOR SHALL PROMPTLY REPAIR OR REPLACE THE DEFECTIVE ITEMS AT NO
ADDITIONAL COSTS TO THE UNIVERSITY, INCLUDING COST OF LABOR AND MATERIALS.
12.ARCHITECTURAL SPECIFICATIONS, GENERAL, SPECIAL AND SUPPLEMENTAL CONDITIONS SHALL FORM A
PART OF THIS CONSTRUCTION DOCUMENT.
13.UPON COMPLETION OF THE WORK, CONDUCT AN OPERATING TEST AND DEMONSTRATE TO THE
UNIVERSITY'S REPRESENTATIVE THAT ALL EQUIPMENT ARE OPERATING IN A SATISFACTORY MANNER
AND IN ACCORDANCE TO THE REQUIREMENTS OF DRAWINGS.
14.USE ELECTRICAL METALLIC TUBING FOR TRADE SIZES OF 3/4 TO 2 INCHES INCLUSIVE IN DRY
LOCATIONS, USE RIGID METALLIC CONDUIT IN EXTERIOR INSTALLATION. USE RIGID METALLIC CONDUIT
FOR ANY FEEDERS.
15.USE FLEXIBLE STEEL CONDUITS FOR SHORT CONNECTIONS TO MOTORS AND IN DRY LOCATIONS I.E.
ABOVE ACCESSIBLE CEILING FOR LIGHTING AND CONVENIENT OUTLETS BRANCH CIRCUITING, AND IN
STUD WALLS WHERE ALLOWED BY THE LOCAL CODE. USE LIQUID TIGHT FLEXIBLE CONDUITS IN AREAS
EXPOSED TO WEATHER. PROVIDE INTEGRAL GROUNDING CONDUCTOR FOR LENGTHS EXCEEDING 6
FEET. FLEXIBLE CONDUITS FOR CONNECTION TO THE ROOF TOP AIR CONDITIONERS SHALL BE
PROVIDED WITH INTEGRAL GROUND WIRE REGARDLESS OF THE LENGTH.
16.OUTLET AND JUNCTION BOXES SHALL BE GALVANIZED PRESSED STEEL WITH PLUGGED HOLES. ALL
BOXES SHALL BE OF CEC CODE SIZE FOR THE NUMBER OF WIRES OR CONDUITS PASSING THROUGH OR
TERMINATING THEREIN BUT IN NO CASE SHALL ANY BOX BE LESS THAN 4 INCHES SQUARE BY 2-1/8
INCHES DEEP. NO PLASTIC BOXES SHALL BE ALLOWED.
17.SINGLE CONDUCTOR COPPER WIRE WITH 600 VOLTS INSULATION SHALL BE USED FOR GENERAL WIRING
IN CONDUIT UNLESS OTHERWISE SHOWN. ALL CONTACTS, GROUNDING AND NEUTRAL BUS BARS SHALL
BE COPPER.
18.CONDUCTORS 8-AWG AND LARGER SHALL BE STRANDED TYPE. CONDUCTORS 10-AWG AND SMALLER
SHALL BE SOLID WITH COLOR CODED INSULATION.
19.PROVIDE CONDUCTORS TYPE THW OR THWN FOR DRY AND WET LOCATIONS AND THHN FOR DRY
LOCATIONS ONLY.
20.MINIMUM SIZE CONDUCTOR FOR USE IN LIGHTING AND POWER BRANCH CIRCUITS SHALL BE 12-AWG.
21.NO WIRE AMPACITY REDUCTION SHALL BE ALLOWED ON THE FEEDERS AND BRANCH CIRCUIT WIRING
INCLUDING NEUTRALS UNLESS APPROVED BY THE UNIVERSITY'S REPRESENTATIVE.
22.LABEL ALL CONDUIT, JUNCTION BOXES, PANELS AND TRANSFORMERS WITH THE VOLTAGE AND CIRCUIT
NUMBER(S).
23.ENGRAVE ALL SWITCHES AND OUTLETS WITH PANEL AND CIRCUIT NUMBER.
24.WIRES AND CONDUITS SIZES INDICATED THROUGHOUT THE DRAWINGS ARE BASED ON COPPER
CONDUCTORS.
25.MINIMUM SIZE OF CONDUIT FOR POWER, LIGHTING, AND MECHANICAL EQUIPMENT SHALL BE 3/4" (UON).
26.SHOP DRAWING SUBMITTALS ARE REQUIRED FOR THE FOLLOWING MATERIAL/EQUIPMENT:
A.LIGHTING FIXTURES.
B.SPECIAL OR BUILT-TO-ORDER EQUIPMENT.
26.LIGHTING FIXTURES SHALL BE COMPLETE WITH ALL GLASSWARE, FITTERS, CANOPIES, SOCKETS,
MOUNTING BRACKETS, REFLECTORS, LAMPS AND ALL ACCESSORIES AS REQUIRED.
27.FIXTURE SCHEDULE INDICATES GENERAL DESCRIPTION OF LIGHTING FIXTURES AND MANUFACTURER'S
CATALOG NUMBERS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO STUDY THE SCHEDULE AND
CAREFULLY REVIEW ELECTRICAL AND ARCHITECTURAL PLANS AND SPECIFICATIONS TO DETERMINE
THE CORRECT CEILING CONFIGURATION AND FIXTURES TO BE FURNISHED SO THAT BOTH CEILING
SYSTEM AND LIGHT FIXTURE CONSTRUCTION MATCHES.
28.COORDINATE EXACT LOCATION OF THE LIGHTING FIXTURES WITH THE ARCHITECTURAL DRAWINGS. IF
ANY DISCREPANCIES EXIST, THEY SHALL BE BROUGHT TO THE ATTENTION OF THE UNIVERSITY'S
REPRESENTATIVE FOR CLARIFICATION PRIOR TO INSTALLATION.
29.LIGHTING FIXTURES FINISHES WHETHER OR NOT SHOWN ON THE DRAWINGS SHALL BE APPROVED BY
UNIVERSITY'S REPRESENTATIVE.
30.PROVIDE GROUNDING SYSTEM PER 2022 CEC AND AS INDICATED.
31.ALL METAL AND NON-CURRENT CARRYING PART OF THE ELECTRICAL EQUIPMENT SHALL BE BONDED TO
GROUND PER CEC CODE ARTICLE 250.
32.PROVIDE A TYPE-WRITTEN INDEX CARD FOR EACH PANEL BOARD INDICATING NAME OR NUMBER OF THE
ROOM, AREA, OR EQUIPMENT USED BY EACH BRANCH CIRCUIT. USE ROOM NUMBERS AND NAMES
VERIFIED IN THE FIELD AND NOT NECESSARILY THOSE SHOWN ON THE DRAWINGS.
33.PROVIDE FIREPROOFING FOR RECESS MOUNTED FIXTURES. RECEPTACLES, AND CONDUIT IN FIRE
RATED AREAS. SEE ARCHITECTURAL PLANS FOR DETAIL AND LOCATION.
34.ALL SHUTDOWN SHALL BE COORDINATED WITH THE UNIVERSITY'S REPRESENTATIVE.
35.TEMPORARY MATERIALS MUST BE REMOVED WITHOUT SHUTDOWN AS CONSTRUCTION PROGRESSES.
36.RESTORE PERMANENT FACILITIES TO THEIR FORMER OR NEWLY SPECIFIED CONDITION.
GENERAL NOTES
DESCRIPTION
W
V
LIGHT FIXTURE AS SPECIFIED, SUBSCRIPTS WHEN INDICATED DENOTE BRANCH
CIRCUIT/SWITCH LEG
CROSS LINES DENOTE NUMBER OF #12 WIRE, SIZE CONDUIT PER CODE AND AS NOTED ON
PLANS, NOT INCLUDING EQUIPMENT GROUND WIRE
FLUSH MOUNTED DOUBLE DUPLEX RECEPTACLE OUTLET @ +18" U.O.N. 125V 2P, 3W, 20A
(NEMA 5-20R)
FLUSH MOUNTED GFCI DUPLEX RECEPTACLE OUTLET @ +18" UON 125V 2P, 3W, 20A (NEMA 5-20R)
WHITE COLOR
FLUSH MOUNTED DUPLEX RECEPTACLE OUTLET @ +18" UON 125V 2P, 3W, 20A (NEMA 5-20R)
WHITE COLOR
E0.00:GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
E0.10:SINGLE LINE DIAGRAM, AND PANEL SCHEDULES
E0.11:LIGHTING FIXTURE SCHEDULES
E1.00:ELECTRICAL SITE PLAN
E1.01:METER /MAIN LOCATION ELEVATION
E1.10:POWER PLAN
E1.11:MECHANICAL POWER PLAN
E1.12:ELECTRICAL ROOF PLAN
E2.10:LIGHTING PLAN
E2.11:EMERGENCY LIGHTING PHOTOMETRIC PLAN
E2.12:LIGHTING CONTROL DETAILS
E3.01:INDOOR LIGHTING TITLE 24 COMPLIANCE FORMS
E3.02:OUTDOOR LIGHTING TITLE 24 COMPLIANCE FORMS
E3.03:ELECTRICAL POWER DISTRIBUTION TITLE 24 COMPLIANCE FORMS
E4.01:ELECTRICAL DETAILS
ED1.10:ELECTRICAL DEMOLITION PLAN
DRAWING LIST:
E0.10
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
SINGLE LINE
DIAGRAM, AND
PANEL
SCHEDULES
SCE
METER
Isc = ?? AIC (PER SCE)
MAIN METER/MAIN "MSA"
NEMA 3R
400A, 120Y/240V, 1Ø, 3W
AIC= 22,000A
N
1"C -1# 2/O
400A
1P
M
2
(MECH.)
1
SPD3
MA
PANEL
N.T.S.E0.10
1 SINGLE LINE DIAGRAM
SINGLE LINE DIAGRAM GENERAL NOTES:
1.FEEDER LENGTH AND VOLTAGE DROP CALCULATIONS ARE FOR PLAN CHECK PURPOSES ONLY AND MAY NOT BE USED
FOR BID OR CONSTRUCTION.
2.MAXIMUM VOLTAGE DROP FOR NON-RESIDENTIAL FEEDERS SHALL BE LESS THAN 2%.
3.ALL CIRCUIT BREAKERS AND PANELBOARDS SHALL BE OF THE SAME MANUFACTURER.
4.ALL GROUNDING CONNECTIONS BELOW GROUND SHALL BE CADWELD.
5.ALL EQUIPMENT EXPOSED TO OUTDOOR ENVIRONMENT SHALL BE WEATHERPROOF NEMA 3R.
6.ALL PENETRATIONS SHALL BE FIREPROOFED WITH AN AUTHORITIES HAVING JURISDICTION APPROVED FIRE
PROTECTION MEANS.
7.METER/MAIN PANELBOARD SHALL BE APPROVED BY SCE PRIOR TO PURCHASING.
8.CONTRACTOR SHALL HIRE A CALIFORNIA REGISTERED PROFESSIONAL ENGINEER WITH 5+ YEARS EXPERIENCE, TO
PERFORM SHORT CIRCUIT, COORDINATION AND ARC FLASH ANALYSIS AND LABELS (IN ACCORDANCE WITH IEEE
1584-2018 AND PPE RECOMMENDATION PER NFPA 70E 2023) AND PROVIDE ARC FLASH LABELING FOR ELECTRICAL
EQUIPMENT PRIOR TO ENERGIZING THE EQUIPMENT) PRIOR TO PURCHASING EQUIPMENT TO ENSURE ALL EQUIPMENT
CAN WITHSTAND AN ELECTRIC FAULT SITUATION WITHOUT DAMAGES.
9.SERVICE EQUIPMENT AT OTHER THAN DWELLING UNITS SHALL BE LEGIBLY MARKED IN THE FIELD WITH THE MAXIMUM
AVAILABLE FAULT CURRENT. THE FIELD MARKING(S) SHALL INCLUDE THE DATE THE FAULT-CURRENT CALCULATION
WAS PERFORMED AND BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. THE CALCULATION
SHALL BE DOCUMENTED AND MADE AVAILABLE TO THOSE AUTHORIZED TO DESIGN, INSTALL, INSPECT, MAINTAIN, OR
OPERATE THE SYSTEM PER NEC 110.24.
10.THE MAXIMUM COMBINED VOLTAGE DROP ON BOTH INSTALLED FEEDER CONDUCTORS AND BRANCH CIRCUIT
CONDUCTORS TO THE FARTHEST CONNECTED LOAD OR OUTLET SHALL NOT EXCEED 5 PERCENT.” BEES 130.5(C).
KEYNOTES:
1 PROVIDE BUILDING POWER SYSTEM GROUND BUS BAR, LOCATED IN ELECTRICAL ROOM.
PROVIDE 1"C -1# 2/0KCMIL TO GROUND RODS.
PROVIDE UL LISTED SURGE PROTECTION DEVICE (SPD) AT PANELBOARD.
PROVIDE TELECOM GROUND BUS BAR. COORDINATE EXACT HEIGHT AND LOCATION IN THE FIELD. PROVIDE CHATSWORTH
PRODUCTS INC (CPI) |40156-012 ANSI-J-STD 607A COMPLIANT U.L.-LISTED TELECOMMUNICATIONS GROUND BUSBAR (TGB).
2
3
PLAN CHECK NOTES:
1.SERVICE EQUIPMENT SHALL BE LEGIBLY MARKED IN THE FIELD WITH THE MAXIMUM AVAILABLE FAULT CURRENT. THE
FIELD MARKING(S) SHALL INCLUDE THE DATE THE FAULT CURRENT CALCULATION WAS PERFORMED AND BE OF
SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED.
2.WHEN MODIFICATIONS TO THE ELECTRICAL INSTALLATION OCCUR, THAT AFFECT THE MAXIMUM AVAILABLE FAULT CURRENT AT
THE SERVICE, AND THE MAXIMUM AVAILABLE FAULT CURRENT SHALL BE VERIFIED OR RECALCULATED AS NECESSARY TO ENSURE
THE SERVICE EQUIPMENT INTERRUPTING RATINGS ARE SUFFICIENT FOR THE MAXIMUM AVAILABLE FAULT CURRENT AT THE LINE
TERMINALS OF THE EQUIPMENT. THE REQUIRED FIELD MARKINGS(S) BE ADJUSTED TO REFLECT THE NEW LEVEL OF MAXIMUM
AVAILABLE FAULT CURRENT. PROVIDE FAULT CURRENT CALCULATIONS THAT SHOW UTILITY CONTRIBUTION AND SHOW ON
DRAWINGS FIELD MARKING(S).
001
G
NEW SCE
INCOMING
OVERHEAD
POWER400A UNDERGROUND
FEEDER
PA
PANEL
SPD3
225A
1P
225A
1P
400A
002
2"C, 3#4/0 CU & 1#6GND CU
GROUND BUS BAR
1"C -1# 2/0 TO MAIN COLD WATER PIPE
1"C -1# 4/0 CONCRETE ENCASED ELECTRODE (UFER GROUND)
1"C -1# 2/O
TELECOM GROUND BUS BAR 4
4
L=75' ; VD=0.43%
2"C, 3#4/0 CU & 1#6GND CU
L=70' ; VD=0.39%
Isc: 18,915A
Isc: 18,915A
E0.11
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
LIGHTING
FIXTURE
SCHEDULES
LIGHTING FIXTURE NOTES
1.ALL FIXTURES SHALL HAVE APPROPRIATE U.L. LABEL, DAMP, OR WET AS
REQUIRED BY LOCAL CODES.
2.ALL FIXTURES SHALL INCLUDE ALL ACCESSORIES FOR INSTALLATION
ACCORDING TO ALL CALIFORNIA ELECTRICAL CODES.
3.PRIOR TO ORDERING ANY LIGHTING EQUIPMENT, THE CONTRACTOR SHALL
VERIFY ALL LOCATIONS AND RECESS DEPTHS.
4.ALL LAMPS SHALL BE INSTALLED ACCORDING TO THE ATTACHED FIXTURE
SCHEDULE.
5.CONTRACTOR SHALL VERIFY FINAL VOLTAGES AND CEILING TRIM
COMPATIBILITY PRIOR TO ORDERING FIXTURES.
6.CEILING THICKNESS IN EXCESS OF 3/4" SHALL BE IDENTIFIED IN WRITING BY
CONTRACT.
7.ALL FIXTURES SHALL BE ORDERED WITH THE APPROPRIATE BALLASTS THAT
HAVE U.L. AND CBM LABELS. ALL BALLASTS MUST CONFORM TO TITLE 24
REQUIREMENTS FOR PERFORMANCE, SWITCHING, AND WIRING (I.E. TANDEM).
8.PROVIDE APPROVED FIRE-RATED ENCLOSURES FOR ALL LIGHTING FIXTURES
LOCATED IN A FIRE-RATED CEILING.
9.WALLS DIRECTLY ILLUMINATED SHALL BE INSTALLED AND FINISHED IN A
MANNER TO ELIMINATE SHADOWS OR BLEMISHES (I.E. HANG DRY WALL
VERTICALLY).
10.ANY FIXTURE SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT AND
OWNER'S REPRESENTATIVE PRIOR TO BID. CONTRACTOR MUST BE PREPARED
TO SUPPLY A SAMPLE AND/OR PHOTOMETRIC DATA IF REQUESTED.
11.ALL EMERGENCY BATTERY PACKS SHALL BE FURNISHED WITH 90-MIN MINIMUM
BACK UP CAPABILITY AND PROVIDE NO LESS THAN 1/3 OF THE FULL LUMEN
OUTPUT OF ANY INDIVIDUAL LAMP. LED LIT, TEST SWITCHES TO BE INTEGRAL
TO FIXTURE, NOT REMOTE MOUNTED. CONTRACTOR SHALL ENSURE THAT A
MINIMUM OF 1-FOOTCANDLE IS PROVIDED AT FLOOR LEVEL ALONG PATH OF
EGRESS.
12.LIGHTING INSTALLED IN CORRIDORS AND STAIRWELLS SHALL BE CONTROLLED
BY OCCUPANT SENSING CONTROLS THAT SEPARATELY REDUCE THE LIGHTING
POWER BY AT LEAST 50% WHEN THE SPACE IS UNOCCUPIED.
13.SHADED FIXTURE INDICATES EGRESS FIXTURE WITH 90 MIN. BATTERY
BACKUP OR CONNECTED TO LIGHTING INVERTER.
N.T.S.E0.11
1 LIGHTING FIXTURE SCHEDULES
X
X
X
X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X
G1
G2
G5
G3
G4
EXISTING POWER POLE
UNDERGROUND CONDUITS, ENCASE IN
CONCRETE, PER APPROVED UTILITY DRAWINGS
MSA
CONDUIT DOWN UTILITY POLE AND TRANSITION
TO UNDERGROUND CONDUIT PER APPROVED
UTILITY DRAWINGS
WP
#10
PA-16
1
F
SF3
SF1
SF2
SF2
SF1
SF2
SF1
SF3
PA-32a
32a
32a
32b
32b
32b
32c
32c 32c
3
E4.01
(TYP AS
NEEDED)
PA-32b & PA-32c
3/4"C, 4#10 & 1#10GND
#10
2
2
#10
#10
E1.00
1/8" = 1'-0"E1.00
1 ELECTRICAL SITE PLAN - PROPOSED
0'8'4'4'
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
GER RE
EN
IGNE
LANOISS
C A L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
GER RE
EN
IGNE
LANOISS
C A L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
ELECTRICAL
SITE PLAN
GENERAL NOTES:
1.SOUTHERN CALIFORNIA EDISON (SCE) APPROVAL IS REQUIRED FOR METER LOCATION PRIOR TO INSTALLATION.
2.FIELD INSPECTORS TO REVIEW AND APPROVE UNDERGROUND SERVICE REQUIREMENTS PRIOR TO CONCRETE
PLACEMENT.
3.SERVICE EQUIPMENT AND SUBPANELS TO HAVE A MININUM 30 INCH WIDE BY 36 INCH DEEP CLEAR WORK SPACE. (CEC
1010.26).
4.CONTRACTOR TO CALL UNDERGROUND SERVICE ALERT/DIG ALERT HOTLINES PRIOR TO CONSTRUCTION.
5.ALL ELECTRICAL EQUIPMENT MOUNTED OUTDOORS SHALL BE WEATHERPROOF (NEMA 3R).
6.ALL OPEN TRENCHES SHALL BE COVERED IN HEAVY PLYWOOD AT ALL TIMES WHEN NO WORK IS BEING PERFORMED. IN
TRAFFIC AREAS CONTRACTOR SHALL USE ONLY HALF OF THE STREET AND THE TRENCHES SHALL BE COVERED BY 1"
THICK STEEL PLATES AT ALL TIMES. CONTRACTOR SHALL PROVIDE FLAG MEN TO DIRECT TRAFFIC.
7.ALL OUTDOOR EQUIPMENT SHALL BE WEATHERPROOF (NEMA 3R) ENCLOSURE.
8.ALL OUTDOOR RECEPTACLES SHALL BE PROVIDED AS GFCI AND WITH WHILE-IN-USE COVERS.
9.THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC ONLY. DO NOT SCALE THE ELECTRICAL DRAWINGS TO
DETERMINE THE LOCATION OF THE EQUIPMENT OR OUTLETS. SEE ARCHITECTURAL PLANS, WHERE PROVIDED ON
PROJECT FOR EXTENT OF DEMOLITION.
10.ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED FROM SPREAD OF FIRE WITH AN APPROVED
FIRESTOP SYSTEM EQUAL OR GREAT THAN THE FIRE RATING OF THE WALL.
11.ALL DEVICE HEIGHTS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR TO ROUGH-IN.
12.PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN CIRCUITRY
13.PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT WHERE OTHERWISE NOTED. HOME RUN CONDUCTORS
MAY BE COMBINED INTO ONE CONDUIT. NO RACEWAY OR CABLE SHALL CONTAIN MORE THAN NINE (9) CURRENT
CARRYING CONDUCTORS. WHERE MULTIPLE CONDUCTORS IN EXCESS OF THREE (3) ARE INDICATED ON THESE
DRAWINGS, THEY HAVE BEEN DERATED AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS.
KEYNOTES:
PROVIDE NEMA 3R, WEATHERPROOF, 250V, 30AS/20AF, 1ɸ, 3-W & GND DISCONNECT SWITCH FOR MOTORIZED GATE.
COORDINATE EXACT LOCATION AND REQUIREMENTS IN THE FIELD.
EXTERIOR LIGHTING SHALL BE ROUTED THROUGH AND CONTROLLED BY ASTRONOMIC TIMECLOCK. RELAYS ARE
LOCATED IN CEILING SPACE AT OFFICE/KITCHEN SPACE 10 WHERE OVERRIDE SWITCHES ARE LOCATED. COORDINATE
EXACT LOCATION OF TIMECLOCK AND SETTING OF TIMES IN THE FIELD.
1
2
1
2
3
A B C D E F
1033 SF
MULTI-PURPOSE
ROOM A
02
212 SF
ENTRY / CHECK
IN OFFICE
01 348 SF
MULTI-PURPOSE
ROOM B
03
HALLWAY
04
375 SF
MULTI-PURPOSE
ROOM C
05
HALLWAY
06
WOMENS
07
MENS
09
343 SF
OFFICE AND
BREAKROOM
10
RESTROOM
11
JANITOR
12
1
1
1
3
3 5
5
5
PA WP
MA MSA
001
002
REFER TO SHEET E1.00
FOR CONTINUATION
WP
5
3
J
PA-1&3&5
J
PA-7&9&11
7 7
991111
7
7
J
PA-13&15&17
J
17
17
17
15 15 15
15
131313
13
19
19
113
D.F.
21
21
PA-19&21&23
J
G.D
MW REF
25
25
25
2727
29
PA-25&27&29
PA-31&33&35
35
31
31
33
PA-37&39
37 39
12
12
PA-2,4
#10
PA-6&8
2
4
3
WP
J
WP
PA-12&14
1414
5
WP
10'-7"
J
5
6
7
7
7
7
CR
CR
PA-18
PA-20
8
8
8
E1.10
1/4" = 1'-0"E1.10
1 POWER PLAN - PROPOSED
0'8'4'4'
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
POWER PLAN
GENERAL NOTES:
1.THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC ONLY. DO NOT SCALE THE ELECTRICAL DRAWINGS TO
DETERMINE THE LOCATION OF THE EQUIPMENT OR OUTLETS. SEE ARCHITECTURAL PLANS, WHERE PROVIDED ON
PROJECT FOR EXTENT OF DEMOLITION.
2.ALL RECEPTACLES ON COMMON WALLS SHALL BE SEPARATE BOXES AND OFFSET MINIMUM 24 INCHES.
3.ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED FROM SPREAD OF FIRE WITH AN APPROVED
FIRESTOP SYSTEM EQUAL OR GREAT THAN THE FIRE RATING OF THE WALL.
4.ALL DEVICE HEIGHTS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR TO ROUGH-IN.
5.EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL CONFORM TO CEC, ARTICLE 300.22(C).
6.PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN CIRCUITRY
7.PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT WHERE OTHERWISE NOTED. HOME RUN CONDUCTORS
MAY BE COMBINED INTO ONE CONDUIT. NO RACEWAY OR CABLE SHALL CONTAIN MORE THAN NINE (9) CURRENT
CARRYING CONDUCTORS. WHERE MULTIPLE CONDUCTORS IN EXCESS OF THREE (3) ARE INDICATED ON THESE
DRAWINGS, THEY HAVE BEEN DERATED AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS.
8.NO EQUIPMENT, J-BOXES, ETC. REQUIRING ACCESS SHALL BE LOCATED IN HARD LID CEILING AREAS (UNLESS ACCESS
PANEL IS PROVIDED. COORDINATE WITH ARCHITECT.) RELOCATE ANY EXISTING EQUIPMENT, J-BOXES, ETC. TO
ACCESSIBLE CEILING AREA.
9.COORDINATE RECEPTACLE LOCATIONS WITH DATA OUTLET LOCATIONS AND GANG DEVICES IN BOXES AND COVER
PLATES.
10.POWER AND DATA CORE AND FACEPLATES TO MATCH COLOR OF ADJACENT WALL.
11.WHEN EXPOSED CEILINGS OR OPEN GRID CONDITIONS OCCUR, THE CONTRACTOR SHALL PROVIDE THE FOLLOWING:
11.1.ALL BRANCH CIRCUITS SHALL BE IN EMT CONDUITS.
11.2.ALL BRANCH CIRCUITS SHALL BE ROUTED, NEATLY AND IN PARALLEL TO STRUCTURES OR DUCT WORK.
11.3.VISUALLY OBJECTIONABLE BRANCH CIRCUITS SHALL BE REROUTED AT THE REQUEST OF THE ARCHITECT AT NO
ADDITIONAL COST.
12.CONTRACTOR SHALL SCAN FLOORS FOR REBAR AND AVOID WHERE NEW CORES ARE BEING MADE FOR NEW
POKE-THRU'S AND NEW DATA CONDUITS. COORDINATE EXACT LOCATIONS IN THE FIELD.
13.CONTRACTOR SHALL COORDINATE CONDUITS, BOX LOCATIONS, ETC. WITH THE CITY OF SANTA ANA'S TELE/DATA AND
SECURITY VENDOR PRIOR TO ROUGH-IN.
KEYNOTES:
CONTRACTOR TO PROVIDE POWER CONNECTION TO DRINKING FOUNTAIN. COORDINATE EXACT LOCATION OF POWER
CONNECTION IN THE FIELD PRIOR TO INSTALL.
PROVIDE POWER FOR UNDER COUNTER GARBAGE DISPOSAL WITH ON/OFF SWITCH AT +44" A.F.F. VERIFY ELECTRICAL
REQUIREMENTS.
RECEPTACLES DEDICATED TO IT SYSTEMS. COORDINATE EXACT LOCATION AND FINAL REQUIREMENTS IN THE FIELD.
PROVIDE GROUND BUS BAR FOR TELECOM EQUIPMENT. REFER TO SINGLE LINE DIAGRAM SHEET E0.10 FOR ADDITIONAL
REQUIREMENTS.
PROVIDE NEMA 3R, WEATHERPROOF, DISCONNECT SWITCH FOR IRRIGATION CONTROLLER. PROVIDE RECEPTACLE ADJACENT
TO IRRIGATION CONTROLLER. COORDINATE EXACT LOCATION AND REQUIREMENTS IN THE FIELD.
PROVIDE RECEPTACLE AND DATA OUTLET INSIDE CABINETRY. COORDINATE EXACT LOCATION IN THE FIELD.
PROVIDE EXTERIOR GFCI, WEATHERPROOF, TAMPER-RESISTANT RECEPTACLE WITH WHILE-IN-USE LOCKABLE COVER, EQUAL
TO TAYMAC CAT #: MX3200. CONTRACTOR SHALL PROVIDE LOCKS, FOR EACH EXTERIOR RECEPTACLE, KEYED EQUAL AND
HAND-OVER TO OWNER'S REPRESENTATIVE AT END OF PROJECT.
PROVIDE MOTOR RATED SWITCH AND DOOR OPENER. PROVIDE CONDUIT AND WIRES FOR CONTROLS & PUSH PLATES AND
COORDINATE EXACT REQUIREMENTS IN THE FIELD WITH AUTO-DOOR VENDER SUPPLIER.
1
2
3
4
5
6
7
8
1
2
3
A B C D E F
1033 SF
MULTI-PURPOSE
ROOM A
02
212 SF
ENTRY / CHECK
IN OFFICE
01 348 SF
MULTI-PURPOSE
ROOM B
03
HALLWAY
04
375 SF
MULTI-PURPOSE
ROOM C
05
HALLWAY
06
WOMENS
07
MENS
09
343 SF
OFFICE AND
BREAKROOM
10
RESTROOM
11
JANITOR
12
PA
MA
MSA
FC
1
M2
1
M2
FC
3
1
FC
5
1
M2
M2
FC
2
1
M2
FC
4
1
MA-25
F
2 MA-2,4
25
25
25
25
25
F4 3/4"C, 2#8 & 1#10GND
33
3
3
3
CU
1
CU
2
CU
3
CU
4
MA-1,3
MA-5,7
WP
F5WP
F4WP
F6WP
1"C, 2#6 & 1#8GND
MA-9,11
3/4"C, 2#8 & 1#10GND
MA-13,15
3/4"C, 2#8 & 1#10GND
EF
2
#10EWH
1
M
7
8
E1.11
1/4" = 1'-0"E1.11
1 POWER PLAN - PROPOSED
0'8'4'4'
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
MECHANICAL
POWER PLAN
GENERAL NOTES:
1.THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC ONLY. DO NOT SCALE THE ELECTRICAL DRAWINGS TO DETERMINE
THE LOCATION OF THE EQUIPMENT OR OUTLETS. SEE ARCHITECTURAL PLANS, WHERE PROVIDED ON PROJECT FOR
EXTENT OF DEMOLITION.
2.ALL RECEPTACLES ON COMMON WALLS SHALL BE SEPARATE BOXES AND OFFSET MINIMUM 24 INCHES.
3.ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED FROM SPREAD OF FIRE WITH AN APPROVED
FIRESTOP SYSTEM EQUAL OR GREAT THAN THE FIRE RATING OF THE WALL.
4.ALL DEVICE HEIGHTS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR TO ROUGH-IN.
5.EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL CONFORM TO CEC, ARTICLE 300.22(C).
6.PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN CIRCUITRY.
7.PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT WHERE OTHERWISE NOTED. HOME RUN CONDUCTORS
MAY BE COMBINED INTO ONE CONDUIT. NO RACEWAY OR CABLE SHALL CONTAIN MORE THAN NINE (9) CURRENT
CARRYING CONDUCTORS. WHERE MULTIPLE CONDUCTORS IN EXCESS OF THREE (3) ARE INDICATED ON THESE
DRAWINGS, THEY HAVE BEEN DERATED AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS.
8.NO EQUIPMENT, J-BOXES, ETC. REQUIRING ACCESS SHALL BE LOCATED IN HARD LID CEILING AREAS (UNLESS ACCESS
PANEL IS PROVIDED. COORDINATE WITH ARCHITECT.) RELOCATE ANY EXISTING EQUIPMENT, J-BOXES, ETC. TO
ACCESSIBLE CEILING AREA.
9.COORDINATE RECEPTACLE LOCATIONS WITH DATA OUTLET LOCATIONS AND GANG DEVICES IN BOXES AND COVER
PLATES.
10.POWER AND DATA CORE AND FACEPLATES TO MATCH COLOR OF ADJACENT WALL.
11.WHEN EXPOSED CEILINGS OR OPEN GRID CONDITIONS OCCUR, THE CONTRACTOR SHALL PROVIDE THE FOLLOWING:
11.1.ALL BRANCH CIRCUITS SHALL BE IN EMT CONDUITS.
11.2.ALL BRANCH CIRCUITS SHALL BE ROUTED, NEATLY AND IN PARALLEL TO STRUCTURES OR DUCT WORK.
11.3.VISUALLY OBJECTIONABLE BRANCH CIRCUITS SHALL BE REROUTED AT THE REQUEST OF THE ARCHITECT AT NO
ADDITIONAL COST.
12. CONTRACTOR TO PROVIDE 1/2"CONDUIT WITH PULLSTRING TO ALL NEW THERMOSTAT LOCATIONS. COORDINATE
SCOPE OF WORK WITH MECHANICAL DRAWINGS.
KEYNOTES:
POWER TO FAN COIL UNIT FROM OUTSIDE, ROOF MOUNTED, CONDENSING UNIT. CONTRACTOR TO PROVIDE 3/4"C AND
CONNECTION TO ROOF MOUNTED CONDENSING UNIT. COORDINATE SCOPE OF WORK WITH SHEET E2.4-4.
CONTRACTOR TO PROVIDE 30AS/30AF, 250V, 1-PHASE & GROUND DISCONNECT SWITCH TO SERVE WATER HEATER.
CONTRACTOR TO PROVIDE 120V POWER CONNECTION AND GFCI RECEPTACLE TO SERVE FAN COIL UNIT CONDENSATE PUMP.
COORDINATE EXACT LOCATION OF NEW RECEPTACLE IN THE FIELD.
CONTRACTOR TO PROVIDE NEMA 3R, WEATHERPROOF, 60AS/40AF, 250V, 1-PHASE & GROUND FUSED DISCONNECT SWITCH TO
SERVE CONDENSING UNITS CU-1, CU-3. COORDINATE EXACT LOCATION OF DISCONNECT SWITCH IN THE FIELD. CIRCUITING
SHOW UNDER EQUIPMENT TAG FOR CLARITY OF DRAWINGS.
CONTRACTOR TO PROVIDE NEMA 3R, WEATHERPROOF, 60AS/50AF, 250V, 1-PHASE & GROUND FUSED DISCONNECT SWITCH TO
SERVE CONDENSING UNITS CU-2. COORDINATE EXACT LOCATION OF DISCONNECT SWITCH IN THE FIELD. CIRCUITING SHOW
UNDER EQUIPMENT TAG FOR CLARITY OF DRAWINGS.
CONTRACTOR TO PROVIDE NEMA 3R, WEATHERPROOF, 60AS/30AF, 250V, 1-PHASE & GROUND FUSED DISCONNECT SWITCH TO
SERVE CONDENSING UNITS CU-4. COORDINATE EXACT LOCATION OF DISCONNECT SWITCH IN THE FIELD. CIRCUITING SHOW
UNDER EQUIPMENT TAG FOR CLARITY OF DRAWINGS.
CONTRACTOR TO PROVIDE MOTOR RATED SWITCH AND CONNECT EXHAUST FAN TO WALL MOUNTED OCCUPANCY SENSOR.
COORDINATE EXACT REQUIREMENTS IN THE FIELD.
CONTRACTOR TO FURNISH AND INSTALL (4) FOUR ADDITIONAL GFCI RECEPTACLES, CONDUIT, WIRING ETC., IN THE ATTIC
SPACE. EXACT LOCATIONS TO BE DETERMINED IN THE FIELD WITH OWNER'S REPRESENTATIVE. CONTRACTOR SHALL ASSUME
A MIN. OF 200FT OF CONDUIT WORK. CONNECT TO PANEL PA-41.
1
2
3
4
5
6
7
8
1
2
3
A B C D E F
RI
D
G
E
LEVEL LEVEL
LE
V
E
L
LE
V
E
L
(E) 1/2" / 1'-0"
RI
D
G
E
VAL
L
E
Y
VAL
L
E
Y
(E) 6" / 1'-0"(E) 6" / 1'-0"
(E) 6" / 1'-0"
(E
)
6
"
/
1
'
-
0
"
(E) 6" / 1'-0"
(E
)
6
"
/
1
'
-
0
"
MIN., VIF
(E) 1/2" / 1'-0"
MIN., VIF
(E) 1/2" / 1'-0"
MIN., VIF
(E) 1/2" / 1'-0"
MIN., VIF
(E
)
1
/
2
"
/
1
'
-
0
"
MI
N
.
,
V
I
F
(E
)
1
/
2
"
/
1
'
-
0
"
MI
N
.
,
V
I
F
WP
M
WP
EF
1
PA-22
MA-27
1
E1.12
1/4" = 1'-0"E1.12
1 ELECTRICAL ROOF PLAN - PROPOSED
0'8'4'4'
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
ELECTRICAL
ROOF PLAN
GENERAL NOTES:
1.ALL RECEPTACLES MOUNTED ON THE ROOF SHALL BE GFCI AND WEATHER PROOF TYPE.
2.A ELECTRICAL EQUIPMENT MOUNTED OUTDOORS SHALL BE WEATHERPROOF (NEMA 3R).
3.REFER TO MECHANICAL DRAWING FOR CONTROL WIRING OF ALL HVAC EQUIPMENT PROVIDE ALL CONDUITS, WIRES
AND DEVICES ACCORDINGLY.
4.COORDINATE WITH MECHANICAL CONTRACTOR FOR SPECIFIC RESIDENTIAL UNIT SERVED BY EACH ROOF UNIT. REFER
TO TYPICAL UNIT ENLARGED PLAN ON SHEET E401 THROUGH E408 FOR CIRCUITING INFORMATION OF RESIDENTIAL
ROOFTOP UNITS. PROVIDE WEATHERPROOF DISCONNECT SWITCH AND FINAL CONNECTION AS REQUIRED. PROVIDE
CUSTOM NAMEPLATE ON FACE OF EACH DISCONNECT TO IDENTIFY THE RESIDENTIAL UNIT IT IS SERVED AND
ASSOCIATED PANEL CIRCUITS OF THE UNIT.
5.ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED FROM SPREAD OF FIRE WITH AN APPROVED
FIRESTOP SYSTEM EQUAL OR GREATER THAN THE FIRE RATING OF THE WALL.
6.ALL DISCONNECT SWITCHES SHALL BE MOUNTED STRUCTURALLY AND INDEPENDENT OF THE EQUIPMENT THEY ARE
SERVING.
7.DISCONNECT SWITCHES SHALL BE MOUNTED WITHIN SIGHT OF EQUIPMENT IT SERVES.
8.CONTRACTOR TO REFER TO MECHANICAL DRAWINGS AND PROVIDE 1/2"CONDUIT, WITH PULLSTRING, TO ALL
THERMOSTAT LOCATIONS. COORDINATE SCOPE OF WORK WITH MECHANICAL DRAWINGS.
9.WHEREVER POSSIBLE, RUN CONDUITS SERVING ROOF MOUNTED RECEPTACLES, DISCONNECT SWITCHES, EQUIPMENT,
ETC. BELOW CEILING SPACE, WHERE AMBIENT TEMPERATURE WILL BE BELOW 30°C. FINAL CONNECTIONS TO ROOF
EQUIPMENT IS LIMITED TO 5'-0" OF DIRECT SUN EXPOSURE. WHERE CONDUITS CANNOT BE ROUTED IN CEILING SPACE
BELOW, PLACE CONDUITS ON DURA BLOCK SLEEPERS (48" O.C.) ALONG THE ENTIRE LENGTH OF THE CONDUIT SYSTEM
INSTALLATION.
10.THE MAXIMUM COMBINED VOLTAGE DROP ON BOTH INSTALLED FEEDER CONDUCTORS AND BRANCH CIRCUIT
CONDUCTORS TO THE FARTHEST CONNECTED LOAD OR OUTLET SHALL NOT EXCEED 5 PERCENT.” BEES 130.5(C).
KEYNOTES:
PROVIDE NEMA 3R WEATHERPROOF STARTER, WITH ASTRONOMIC TIMER, FUSED DISCONNECT SWITCH AND 120V, 1PH
POWER CONNECTION FOR EXHAUST FAN. COORDINATE EXACT LOCATION AND REQUIREMENTS IN THE FIELD.
1
MULTI-PURPOSE
ROOM A
02
ENTRY / CHECK
IN OFFICE
01
MULTI-PURPOSE
ROOM B
03
HALLWAY
04
MULTI-PURPOSE
ROOM C
05
HALLWAY
06
WOMENS
07
MENS
09
RESTROOM
11
JANITOR
12
OFFICE AND
BREAKROOM
10
1
2
3
A B C D E F
A.F.F.
GYP. BD.
8' - 11"
A.F.F.
GYP. BD.
8' - 11"
A.F.F.
GYP. BD.
8' - 11"
A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
9' - 11"A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
9' - 11"
A.F.F.
ACT-1
8' - 9"
A.F.F.
(E) PLASTER
12' - 8"
A.F.F.
GYP. BD.
8' - 11"
NO CEILING
EXPOSED STRUCTURE
12' - 5" A.F.F.
NO CEILING
EXPOSED STRUCTURE
+7'-6"
+8'-0"
+8'-7"
+8'-7"
+8'-7"
+8'-7"
+10'-6"
+11'-5"
+10'-6"+10'-6"
+10'-6"
+10'-6"
+11'-5"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
7' - 0"
+8'-0"
TYP.
TYP.
TYP.
F3E
F3
F3 F3 F3
F3EF3
F3F3
F3E F3
F3F3
F3F3E
F3 F3
F3E
F3F3
F4
F4
F3
F3
F3E F3
F1
F5E
F5
F5E
F5
F12 F12
F12
F1 F1
F11 F11E F11 F11E F11 F11 F11EF13F11E
F10E F10E F10E F10E F10E
F10E
F10E
F9E F9E F9EF9EF9EF9E
F9E
F9E
F9E
F9 F9
111111
1
1
1
1 1
F8 F8
F8
F8
F8E
F8
F9E 1
F8E
F7
F6
FX
F2 F2
F2E
F2E
F6 F6
F6E F6 F6E
F8
JJ J J J JJ
J
J
J J
J
J
a
OS
a
a
OS
a
J J J
J
a
a
OS
a
OS
a
OS
a
OS
a
2
a,b
J
c
a a a a
OS
F2
F2F2 F2 F2
F2F2F2F2
3
OS
a,b
OS
OS
OS
OS
OS
a,b a,b
a,b a,b a,b
J
F12 3 F12 3
a,b a,b
3
J
OS
a,b
a,b
PA-34
34a
34a
34a
34a
34b
a,b 4
c
c
4
J J
34a
34a
34a 34a
34a
34a
34a
34a
34a
34a
34a
34a
34b 34b
F1 F1
J
J
5
J
OS
a,b
OS
a,b
a,b
OS
a,b
OS
a,b
34a
OS
a,b
OS
a,b
34c 34c
34a 34a 34a 34a
34a
34b 34b
PA-36
36b 36b36b36b
36b 36b 36b 36b 36b
36a
36a36a
36a36a
36a36a
36a 36a
36a 36a 36a 36a 36a
36a36a36a36a36a
36c 36c 36c
J
J
1
1
J
F14
OS
J
J
JJJJJ
OS
a
OS
a38a
38a
38a
38a
38a
38a 38a 38a
38a38a
38a
38a
38a
38a
38a
38a
38a
38a
38a
38a
38a
PA-38
PA-32d & PA-32e & PA-32f
3/4"C, 6#10 & 1#10GND
32d
32d
32d
32d
32d
32d 32d
32e
32e
32d 32d 32d 32d
32f
32f
32f32f32f32f32f
32d
a,b,c,d
e,f
#10#10
#10
#10
#10
#10
#10
#10 #10 #10 #10
#10
#10
#10 #10 #10
6
EX1
EX1
EX1
EX2
EX2 7
7
77
7
1
1
6 6 6 6
6
6
6
6
6
8
E2.10
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
LIGHTING PLAN
GENERAL NOTES:
1.REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND ELEVATION OF ALL
LIGHTING FIXTURES AND ALL LIGHTING CONTROL DEVICES. ALL WALL MOUNTED
DEVICES SHALL BE VERIFIED WITH ARCHITECT PRIOR TO ROUGH-IN.
2.CONTRACTOR SHALL VERIFY CEILING CONSTRUCTION WITH ARCHITECTURAL PLAN
AND PROVIDE LIGHTING FIXTURES WILL ALL NECESSARY MOUNTING HARDWARE.
3.CONTRACTOR TO REFER TO DRAWING E1.06 FOR FIXTURE SCHEDULE.
4.SUPPORT CEILING MOUNTED LIGHTING FIXTURES FROM BUILDING STRUCTURE. DO
NOT SUPPORT LIGHT FIXTURES FROM PIPING, DUCTWORK OR ANY OTHER
EQUIPMENT, OR SOLELY FROM THE SUSPENDED CEILING.
5.REFER TO ARCHITECTURAL PLANS FOR EXIT SIGN CHEVRONS AND NUMBER OF
FACES PER EXIT SIGN. ANY DISCREPANCIES BETWEEN EXIT SIGNS SHOWN ON
ELECTRICAL AND ARCHITECTURAL PLANS SHALL BE BROUGHT TO THE ATTENTION
OF THE ARCHITECT.
6.WHEN EXPOSED CEILINGS OR OPEN GRID CONDITIONS OCCUR, THE CONTRACTOR
SHALL PROVIDE THE FOLLOWING:
6.1.ALL BRANCH CIRCUITS SHALL BE IN EMT CONDUITS.
6.2.ALL BRANCH CIRCUITS SHALL BE ROUTED, NEATLY AND IN PARALLEL TO
STRUCTURES OR DUCT WORK.
6.3.VISUALLY OBJECTIONABLE BRANCH CIRCUITS SHALL BE REROUTED AT THE
REQUEST OF THE ARCHITECT AT NO ADDITIONAL COST.
8.ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED FROM
SPREAD OF FIRE WITH AN APPROVED FIRESTOP SYSTEM EQUAL OR GREATER
THAN THE FIRE RATING OF THE WALL.
9.ALL DEVICE HEIGHTS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR TO
ROUGH-IN.
10.SWITCH CORE AND FACEPLATES TO MATCH COLOR OF ADJACENT WALL.
11.COMBINE MULTIPLE SWITCHES UNDER SINGLE GANG FACEPLATE AND COVER.
12.CONTRACTOR TO PROVIDE JUNCTION BOXES AS NEEDED FOR A COMPLETE
LIGHTING INSTALLATION. THESE ARE NOT SHOWN FOR CLARITY OF DRAWINGS. NO
JUNCTION BOXES SHALL BE INSTALLED IN HARD-LID CEILINGS.
13.CONTRACTOR TO PROVIDE JUNCTION BOXES NEAR PANELBOARD TO COMBINE
HOMERUNS AS NEEDED.
14.EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL CONFORM
TO CEC, ARTICLE 300.22(C).
15.PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT WHERE OTHERWISE
NOTED. HOME RUN CONDUCTORS MAY BE COMBINED INTO ONE CONDUIT. NO
RACEWAY OR CABLE SHALL CONTAIN MORE THAN NINE (9) CURRENT CARRYING
CONDUCTORS. WHERE MULTIPLE CONDUCTORS IN EXCESS OF THREE (3) ARE
INDICATED ON THESE DRAWINGS, THEY HAVE BEEN DERATED AS REQUIRED BY CEC
ARTICLE 310 REQUIREMENTS.
16.ALL PENDANT FIXTURES SHALL BE PROVIDED WITH SUFFICIENT STEM OR SUSPENSION
CABLE LENGTH PRIOR TO INSTALLATION. VERIFY LENGTHS WITH ARCHITECT.
17.DRAWINGS SHOW CIRCUITING AND SWITCHING REQUIREMENTS AND FIXTURE TYPES
ONLY, CONTRACTOR SHALL VERIFY EXACT LIGHTING FIXTURES AND STANDARD
SWITCHING WITH ARCHITECT AND OWNER PRIOR TO INSTALLATION. ALSO,
CONTRACTOR SHALL VERIFY EXACT LIGHTING FIXTURES VOLTAGE AND FINISH PRIOR
TO INSTALLATION.
18.ALL LED STRIPS (TAPE LIGHTS) WITH "EXTERNAL" LED DRIVERS OR POWER SUPPLIES
SHALL ONLY BE CONNECTED TO LISTED AND CLASS (2) POWER SUPPLIES.
"RECOGNIZED" COMPONENTS OR "CLASS 1" POWER SUPPLIES/LED DRIVERS ARE NOT
ACCEPTABLE.
19.COORDINATE LOCATION OF ALL REMOTE DRIVERS IN THE FIELD WITH ARCHITECTS
PRIOR TO INSTALL. COORDINATE ACCESS PANEL LOCATIONS, IF NEEDED.
CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ARCHITECTS REVIEW SHOWING
ALL REMOTE DRIVERS AND EQUIPMENT REQUIRED FOR THE COMPLETE INSTALLATION
OF THE LIGHTING SYSTEMS.
20.CONTRACTOR SHALL COORDINATE IN FIELD EXACT LOCATION OF LIGHTING CONTROL
DISTRIBUTED DEVICES WITH ARCHITECT PRIOR TO INSTALLATION.
21.ALL BRANCH CIRCUITS SHALL BE SIZED FOR A MAXIMUM VOLTAGE DROP OF 3% AT
DESIGN LOAD.
22.EMERGENCY BATTERY PACK FIXTURES AND EXIT SIGNS SHALL BE PROVIDED WITH AN
UN-SWITCHED CONSTANT HOT CONNECTION TO THE CHARGING LEAD.
KEYNOTES:
PROVIDE MINI INVERTER. LOCATE MINI INVERTER INSIDE BUILDING IN A DRY LOCATION. CONTRACTOR SHALL SIZE MINI
INVERTERS BASED ON INVERTER SIZE AND HOW MANY FIXTURES ARE CONNECTED TOGETHER AND MARK SIZE AND
EXACT LOCATIONS ON RECORD DRAWINGS.
OVERRIDE SWITCH FOR EXTERIOR LIGHTING CONTROLLED VIA TIMECLOCK.
PROVIDE MULTI-FAN SPEED CONTROLS #FC-009 FOR CONTROLS OF THREE (3) FANS AT THE SAME TIME. MULTIFAN
SPEED CONTROLS SWITCH SHALL BE INSTALLED ADJACENT TO LIGHT SWITCH.
PROVIDE WITH FAN SEED CONTROL #FC-001 FOR CONTROL OF FAN IN ROOM. FAN SPEED CONTROL SWITCH SHALL BE
INSTALLED ADJACENT TO LIGHT SWITCH.
PROVIDE DUAL TECH OCCUPANCY SENSOR WITH RELAY AND CONNECTION TO EXHAUST FAN.
EXTERIOR LIGHTING SHALL BE ROUTED THROUGH AND CONTROLLED BY ASTRONOMIC TIMECLOCK. RELAYS ARE
LOCATED IN CEILING SPACE AT OFFICE/KITCHEN SPACE 10 WHERE OVERRIDE SWITCHES ARE LOCATED. COORDINATE
EXACT LOCATION OF TIMECLOCK AND SETTING OF TIMES IN THE FIELD.
EXIT SIGNS SHALL BE CONNECTED TO PANELBOARD PA-30. EXTEND BRANCH CIRCUIT (CONDUIT AND WIRES (2#12 & 1#12
GND) TO ALL EXIT SIGNS.
CONTRACTOR TO FURNISH AND INSTALL (6) SIX ADDITIONAL F14 UTILITY LIGHT FIXTURES IN THE ATTIC SPACE. PROVIDE
SWITCH AT ENTRANCE TO ATTIC. PROVIDE CONDUIT, WIRING ETC., IN THE ATTIC SPACE. EXACT LOCATIONS TO BE
DETERMINED IN THE FIELD WITH OWNER'S REPRESENTATIVE. CONTRACTOR SHALL ASSUME A MIN. OF 200FT OF CONDUIT
WORK. CONNECT TO PANEL PA-28.
1
1/4" = 1'-0"E2.10
1 LIGHTING PLAN - PROPOSED
0'8'4'4'
LMSM-101 SWITCHING LOW VOLTAGE SWITCH (1 LEG - ON/OFF)
PROVIDE CONSTANT "HOT CONNECTION FOR LMRC DEVICE.
EMERGENCY SHUNT TRIP UNIT
LMDC-100 CELING MOUNT OCCUPANCY SENSOROS
TIMECLOCK LMZC-301
LIGHTING CONTROL SYMBOLS LIST:
PROVIDE CONSTANT "HOT CONNECTION FOR LMRC DEVICE.
LMSM-105 DIMMING LOW VOLTAGE SWITCH (4 SCENE + DIMMING)
LMDM-101 DIMMING LOW VOLTAGE SWITCH (1 LEG)
2
3
4
5
PROVIDE CONSTANT "HOT CONNECTION FOR LMRC DEVICE.
LMSW-104 LOW VOLTAGE SWITCH (2 LEG - DIMMING)
6
7
8
MULTI-PURPOSE
ROOM A
02
ENTRY / CHECK
IN OFFICE
01
MULTI-PURPOSE
ROOM B
03
HALLWAY
04
MULTI-PURPOSE
ROOM C
05
HALLWAY
06
WOMENS
07
MENS
09
RESTROOM
11
JANITOR
12
OFFICE AND
BREAKROOM
10
1
2
3
A B C D E F
A.F.F.
GYP. BD.
8' - 11"
A.F.F.
GYP. BD.
8' - 11"
A.F.F.
GYP. BD.
8' - 11"
A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
9' - 11"A.F.F.
GYP. BD.
9' - 11"
A.F.F.
GYP. BD.
9' - 11"
A.F.F.
ACT-1
8' - 9"
A.F.F.
(E) PLASTER
12' - 8"
A.F.F.
GYP. BD.
8' - 11"
NO CEILING
EXPOSED STRUCTURE
12' - 5" A.F.F.
NO CEILING
EXPOSED STRUCTURE
+7'-6"
+8'-0"
+8'-7"
+8'-7"
+8'-7"
+8'-7"
+10'-6"
+11'-5"
+10'-6"+10'-6"
+10'-6"
+10'-6"
+11'-5"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
+8'-0"
7' - 0"
+8'-0"
TYP.
TYP.
TYP.
E2.11
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
EMERGENCY
LIGHTING
PHOTOMETRIC
PLAN
1/4" = 1'-0"E2.11
1 EMERGENCY LIGHTING PHOTOMETRIC PLAN - PROPOSED
0'8'4'4'
Calculation Summary
Label CalcType Units Avg Max Min Avg/Min
01 ENTRY/CHECK IN OFFICE Illuminance Fc 2.6 5.2 1.0 2.6:1
------DISCLAIMER------
LUMINAIRE DATA IS OBTAINED ACCORDING TO IES PROCEDURES UNDER
CONTROLLED LABORATORY CONDITIONS. FIELD RESULTS MAY DIFFER FROM
COMPUTER PREDICTIONS DUE TO MANY UNCONTROLLABLE FACTORS
INCLUDING, BUT NOT LIMITED TO; LINE VOLTAGE VARIATIONS, LAMP
PERFORMANCE, BALLAST INPUT WATTS, LED DRIVERS INPUT WATTS,
TEMPERATURE VARIATIONS AND JOBSITE CONDITIONS.
EMERGENCY LIGHTING
Max/Min
5.2:1
02 MULTI-PURPOSE RM A Illuminance Fc 2.6 3.5 1.3 2.7:1 2.7:1
03 MULTI-PURPOSE RM B Illuminance Fc 3.7 7.4 1.4 5.3:1 5.3:1
04 HALLWAY Illuminance Fc 4.5 6.5 1.7 3.8:1 3.8:1
05 MULTI-PURPOSE RM C Illuminance Fc 3.3 7.2 1.2 2.8:1 6.0:1
06 HALLWAY Illuminance Fc 9.9 17.9 1.1 9.0;1 16.3;1
10 OFFICE AND KITCHEN Illuminance Fc 6.8 11.9 2.8 2.4:1 4.3:1
11 RESTROOM Illuminance Fc 3.3 3.5 3.1 1.1:1 1.1:1
12 JANITOR Illuminance Fc 13.7 20.0 4.6 3.0:1 4.3:1
EXTERIOR Illuminance Fc 5.5 15.2
09 MENS Illuminance Fc 7.1 12.4 2.3 3.1:1 5.4:1
E2.12
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
LIGHTING
CONTROL
DETAILS
GENERAL NOTES:
1.REFER TO E2.10 FOR LIGHTING CIRCUITS AND CONTROL INTENT.
GENERAL NOTES:
LMRJ Series
Pre-Terminated
Cables or CAT5e.
LMRJ Series
Pre-Terminated
Cables or CAT5e.
RJ45 DIGITAL BUS CONNECTORS ARE
LOCATED ON EVERY DIGITAL DEVICE
(DIGITAL DEVICES ARE DEFINED AS:
RELAY PANELS, DIGITAL SWITCHES
AND ALL DIGITAL ACCESSORIES).
1 2
NOTES:
1. OPEN TOPOLOGY CAT. 5 PATCH
CABLE WITH RJ45 CONNECTORS FROM
DIGITAL DEVICE TO DIGITAL DEVICE.
2. REFER TO MANUFACTURERS
INSTRUCTIONS FOR LONG DISTANCE
RUNS BETWEEN DIGITAL DEVICES.
RJ45 CONNECTORS USE THE SAME
COLOR CODING AS ETHERNET, AND
ARE MADE AS STRAIGHT THROUGH
CABLES. CROSS OVER CABLES WILL
CAUSE SYSTEM FAILURE. ALL CABLES
SUPPLIED BY CONTRACTOR.
RJ45 CONNECTOR
3 WHITE/GREEN
2 ORANGE
1 WHITE/ORANGE
4 BLUE
1
8 BROWN
6 GREEN
5 WHITE/BLUE
7 WHITE/BROWN
ORANGE 2
WHITE/BROWN 7
BROWN 8
GREEN 6
WHITE/BLUE 5
BLUE 4
WHITE/GREEN 3
WHITE/ORANGE 1
DIGITAL BUS CONNECTORS
3 WHITE/GREEN
2 ORANGE
1 WHITE/ORANGE
4 BLUE
8 BROWN
6 GREEN
5 WHITE/BLUE
7 WHITE/BROWN
2
RJ45 CONNECTOR
DIGITAL BUS CONNECTORS
2 2
RJ45 CONNECTOR
3. UP TO 1,000 FT TOTAL BUS LENGTH.
4. CRIMP AND TEST EACH CABLE WITH
A LAN CIRCUIT TESTER PRIOR TO
INSTALLATION.
1
2 3 4
5 6
OCCUPANCY SENSOR FOR AUTO SHUTOFF FOR CORRIDORS/HALLWAYS/STAIRWELLS
LMSW-108
8 Button
Dimmer/Override Switch
Installation Example
LMDM-101 LMSW-101 LMSW-102
LMSW-103 LMSW-104 LMSW-105 LMSW-108
RAISE SCENE
1
LOWER
ON/RAISE
A
OFF/LOWER
A
ON/RAISE
B
RAISE
A
LOWER
A
ON/OFF
A
ON
OFF
OFF/LOWER
B
ON/RAISE
A
OFF/ LOWER
A
RAISE
A
LOWER
A
RAISE/
ON A
LOWER
/OFF A
RAISE/
ON B
LOWER
/OFF B
RAISE/
ON C
LOWER
/OFF C
RAISE/
ON D
LOWER
/OFF D
SCENE
2
SCENE
3
SCENE
4
DLM SWITCH CONFIGURATION AND
TYPICAL BUTTON FUNCTION
USE ELCU-200 WITH INVERTER OR GENERATOR POWER
DLM 0-10 VOLT DIMMING ROOM CONTROLLER
MODEL# LMRC-111 OR LMRC-112
LOW VOLTAGE DIMMER SWITCHES
MODEL# LMDM OR LMSW SERIES
CEILING OCCUPANCY SENSOR
LMDC-100
TYPICAL LOW VOLTAGE NETWORK HOOK UP
CAT 5 WITH RJ45 CONNECTORS
UL 924 EMERGENCY CONTROL/SHUNT
MODEL# ECLU-200
PRESS AND HOLD
FOR RAISE AND LOWER
TAP FOR ON
TAP FOR OFF
1A
B-PATTERN
NOTE:Radial coverage of 16 feet
LMRC-11X Series
Dimming Controller
Wiring Diagram
2
DLM SWITCH
CAT 5 CABLE
W RJ45 CONNECTORS
4
OS
* CONFIRM TYPE/QTY PER PLANS *
* CONFIRM TYPE/QTY PER PLANS *
DLM
OCCUPANCY SENSOR
LMDC-100
2
OS
* CONFIRM TYPE/QTY PER PLANS *
DLM
OCCUPANCY SENSOR
LMDC-100
OS
* CONFIRM TYPE/QTY PER PLANS *
DLM
OCCUPANCY SENSOR
LMDC-100
1A
Timeclock/Zone Controller
MODEL# LMZC-301
LMZC-301 Zone Controller
GR
D
NE
U
11
5
v
27
7
v
120v or 277v
LMCT-100
Wireless Configuration Tool
Include at least 1 LMCT
on every project.
1LMZC-301
TIME CLOCK
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
E
R RE
EN
IGNE
LANOISS
CAL IFORNIASTATEOF
LEC T RICAL
EXP: 3-31-27
EFORPDERETS
I
G
E
R RE
EN
IGNE
LANOISS
CAL IFORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
INDOOR LIGHTING
TITLE 24
COMPLIANCE
FORMS
E3.01
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
E
R RE
EN
IGNE
LANOISS
CAL IFORNIASTATEOF
LEC T RICAL
EXP: 3-31-27
EFORPDERETS
I
G
E
R RE
EN
IGNE
LANOISS
CAL IFORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
OUTDOOR
LIGHTING TITLE
24 COMPLIANCE
FORMS
E3.02
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
ELECTRICAL POWER
DISTRIBUTION TITLE
24 COMPLIANCE
FORMS
E3.03
F
E
R
FIRE
I
FINISHED FLOOR
FINISHED FLOOR
46
"
M
A
X
.
34
"
M
A
X
.
OVER OBSTRUCTION
24" MAX.
MOUNTING HEIGHT
FINISHED FLOOR
TOP OF CONTROL
OR OUTLET
TOP OF CONTROL
OR OUTLET
BOTTOM OF CONTROL
OR OUTLET
15
"
M
I
N
.
48
"
M
A
X
.
ALL DEVICE HEIGHTS DEPICTED SHALL BE MODIFIED AS REQUIRED BY 2019 CALIFORNIA BUILDING CODE.
CONTRACTOR TO VERIFY/RECONCILE APPLICABLE CODE REQUIREMENTS AND ANY DEVICE HEIGHT
REQUIREMENTS DEPICTED ON ARCHITECTURAL DRAWINGS & SPECIFICATIONS PRIOR TO DEVICE ROUGH-IN.
CONFLICTS OR LACK OF MOUNTING HEIGHT SPECIFICITY ON THE ARCHITECTURAL DRAWINGS &
SPECIFICATIONS SHALL BE CAUSE FOR THE CONTRACTOR TO ISSUE A FORMAL WRITTEN RFI FOR RESOLUTION.
DEVICE MOUNTING HEIGHT CLARIFICATIONS/SPECIFICATIONS SHALL NOT RESULT IN AN ADDITIONAL COST TO
THE UNIVERSITY - CONTRACTOR SHALL INCLUDE ALL COSTS IN BASE BID.
ALL DEVICES IN IMMEDIATE
PROXIMITY EACH TO OTHER
SHALL ALIGN VERTICALLY AND
HORIZONTALLY
DEVICE ALIGNMENT & MOUNTING HEIGHT DETAILS4SINGLE CONDUIT SUPPORT WITH BRACINGNTS
NOTE:
EXPANSION OR CAST-IN
MIN. 1~0" CHANNEL
45° MAX
PLACE ANCHOR (TYP)
SUPPORT
EXPANSION ANCHOR BEAM ATTACHMENT
'J'HOOK
d = LARGER OF 1~8"
BEAM CLAMP
h
d
DECK INSERTS
1~8"
JAM NUT
1~4"
OR (3~8"-h/3)
MIN.
MIN.
2.
1.MAXIMUM LOADING ON ANY ONE COMPONENT TO BE NO MORE THAN
~8 THE MAXIMUM SAFE LOADING FOR THAT COMPONENT. IF
GREATER LOADING CAPACITIES ARE REQUIRED, PROVIDE
CALCULATIONS SIGNED BY LICENSED STRUCTURAL ENGINEER FOR
REVIEW PRIOR TO INSTALLATION.
IF BRACE ANGLE IS GREATER THAN 45° WITH THE HORIZONTAL,
PROVIDE CALCULATIONS SIGNED BY A LICENSED STRUCTURAL
ENGINEER FOR REVIEW PRIOR TO INSTALLATION.
MIN. 1~0" CHANNEL
LATHERAL BRACE 7'-6"
MAX LENGTH
(TYPICAL)
EXPANSION ANCHOR
PLACED IN BOTTOM OF
FLUTES
3.
2.
LENGTH VARIES WITH NUMBER OF CONDUITS TO BE SUPPORTED.
NOTES
1.
SINGLE RACK
CONCRETE INSERT
HILTI ANCHOR MINIMUM 5/8" DIA. ANCHOR
BOLTS AT LOCATIONS AS REQUIRED TO
MEET THE LOAD 4 SEISMIC BRACING
REQUIREMENTS
CONCRETE
CEILING
UNISTRUT WITH ALLOWABLE LOADING PER MANUFACTURER'S
RECOMMENDATIONS.
FOR SUPPORT IN CONCRETE, USE SWIVEL CONCRETE INSERTS,
AS SHOWN.
MINIMUM
DEPTH
2 IN.
2
3
EXPANSION ANCHOR BEAM ATTACHMENT
'J'HOOK
d = LARGER OF 1~8"HANGER
BEAM CLAMP
h
d
DECK INSERTS
1~8"
JAM NUT
1~4"
HANGER ROD
CLEVIS HANGER
45° MAX.
NOTE:
RODOR (3~8"-h/3)
MIN.
MIN.
~6" MIN.
2.
1.
ATTACHMENT TO
STRUCTURE. STRUCTURE
VARIES, REFER TO
STRUCTURAL DOCUMENTS
FOR CONSTRUCTION TYPE
AND LOAD BEARING
CAPABILITIES
EXPANSION
ANCHOR PLACED
IN BOTTOM OF
FLUTES
MAXIMUM LOADING ON ANY ONE COMPONENT TO BE NO
MORE THAN ~8 THE MAXIMUM SAFE LOADING FOR THAT
COMPONENT. IF GREATER LOADING CAPACITIES ARE
REQUIRED, PROVIDE CALCULATIONS SIGNED BY LICENSED
STRUCTURAL ENGINEER FOR REVIEW PRIOR TO
INSTALLATION.
IF BRACE ANGLE IS GREATER THAN 45° WITH THE
HORIZONTAL, PROVIDE CALCULATIONS SIGNED BY A
LICENSED STRUCTURAL ENGINEER FOR REVIEW PRIOR TO
INSTALLATION.
5CONDUIT TRAPEZE SUPPORTNTS
HANGER ROD ~6" MIN. SAFE
LOAD TO BE 2 TIMES ACTUAL
LOAD IN TENSION AT EACH
ROD
MIN. 1~0" CHANNEL
LONGITUDINAL BRACE
7'-6" MAX LENGTH 45°
MAX ANGLE
SEISMIC
BRACE FITTING
ATTACHMENT TO STRUCTURE.
STRUCTURE VARIES, REFER TO
STRUCTURAL DOCUMENTS FOR
CONSTRUCTION TYPE AND LOAD
BEARING CAPABILITIES
MINIMUM 1~0"
CHANNEL LATHERAL
BRACE. 7'-6" MAXIMUM
LENGTH
6CONDUIT SUPPORT DETAILNTS
SEISMIC BRACE
FITTING
HANGER
ROD
1NTS
IDENTIFICATIONS PER SPECIFICATIONS.
PROVIDE EXTENSIONS AS REQUIRED TO MEET FIELD CONDITIONS.
DIMENSIONS 13"x19"x12" DEEP.
PRECAST CONCRETE BOTTOMLESS PULL BOX. MINIMUM OUTSIDE
BELOW BOX FOR DRAINAGE.
PROVIDE 12" MINIMUM DEPTH OF CRUSHED ROCK OR PEA GRAVEL
PROVIDE STEEL PLATE TRAFFIC BOLT DOWN COVER.)
REINFORCED BOLT DOWN CONCRETE COVER. (IN TRAFFIC AREAS
12
"
15
"
24
"
18
"
M
I
N
1 5
3
4
1
2
3
4
5
2
CAST
CONCRETE
WITH LIFTING
HOLE
GROUND CLAMP `OZ'
TYPE GRC OR
APPROVED EQUIVALENT
FINISHED
GRADE
10" DIAMETER
CONCRETE PIPE
BELL END,
STANDARD LENGTH
4/O AWG
BARE
COPPER
GROUND
CONDUTCOR
SAND
BACKFILL
GROUND
ROD
3/4"X10'-0"
CAST METAL
"WHILE-IN-USE" WP
COVER (S) & GFCI
RECEPTACLE(S)
CAST METAL, 2-GANG,
NEMA 3R JUNCTION
BOX WITH THREADED
HUBS.
RIGID METAL CONDUIT
FOR SUPPORT PER
N.E.C. ART. 314
RIGID METAL
CONDUIT FOR WIRING
SECTION "A-A"
CAST METAL
"WHILE-IN-USE" WP
COVER (S) & GFCI
RECEPTACLE(S)
RIGID METAL CONDUIT
FOR SUPPORT PER
N.E.C. ART. 314
RIGID METAL
CONDUIT FOR
WIRING
ROOF
PENETRATION
AND CONDUIT
SUPPORT PER
SD260533-05
CONDUIT CAP
OR PLUG
46
0
m
m
(1
8
"
)
M
A
X
35
0
m
m
(1
2
"
)
M
A
X
ELEVATION
2GROUND TEST WELL INSTALLATION NTS
3TYPICAL PRECAST 13"x19" JUNCTION BOX NTS
7TYPICAL FREESTANDING DISCONNECT NTS
8RECEPTACLE ROOF MOUNTING DETAILNTS
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
C A L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
C A L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
ELECTRICAL
DETAILS
E4.01
1
2
3
A B C D E F
ED-300
1/4" = 1'-0"ED-300
1 DEMOLITION POWER PLAN 0'8'4'4'
Scale
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
No.Description Date
AS NOTED
Engineering Corp
Mechanical Electrical Plumbing
1920 MAIN STREET, SUITE 820
IRVINE, CA 92614
TEL: 949.516.6480
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
LEC T R ICAL
EXP: 3-31-27
EFORPDERETS
I
G
ER RE
EN
IGNE
LANOISS
CA L I FORNIASTATEOF
No. E21819
E
ALI S A FAIAN
90% CD 5/02/2024
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
625 S. CYPRESS
SANTA ANA, CA
Project number
Date
Drawn by TP/HH
23004
1/15/2025
PERMIT SET 5/17/2024
BACK CHECK SET 1/15/2025
BACK CHECK SET_V2 4/08/2025
DEMO POWER
FLOOR PLAN
GENERAL NOTES:
1.THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE OF THE WORK AND
THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING CONDITIONS AND
THE EXACT NATURE OF THE WORK TO BE DONE, AND TAKE INTO ANY
SPECIAL OR UNUSUAL FEATURES PECULIAR TO THIS JOB. COORDINATE
ELECTRICAL DEMOLITION WORK WITH OWNER.
2.THE ELECTRICAL CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR
TO BID.
3.THE ELECTRICAL CONTRACTOR SHALL INSPECT AND CHECK THE ACTUAL
SCOPE OF WORK TO BE DEMOLISHED. COORDINATE ELECTRICAL
DEMOLITION WITH ARCHITECTURAL, STRUCTURAL AND MECHANICAL
DEMOLITION WORK.
4.THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC ONLY. DO NOT SCALE THE
ELECTRICAL DRAWINGS TO DETERMINE THE LOCATION OF THE EQUIPMENT
OR OUTLETS. SEE ARCHITECTURAL PLANS, WHERE PROVIDED ON PROJECT
FOR EXTENT OF DEMOLITION.
5.CONTRACTOR IS RESPONSIBLE FOR RELOCATING OR REMOVING FROM
WALLS, CEILINGS, FLOOR SPACES, ETC., ANY EXISTING CONDUITS, WIRES,
BOXES, FITTINGS, FIXTURES OR OTHER ELECTRICAL EQUIPMENT WHICH
INTERFERES WITH PLANNED REMODEL WORK.
6.NOTIFY ARCHITECT WHEREVER EXISTING EQUIPMENT IS ENCOUNTERED
WHICH MUST BE RELOCATED DUE TO NEW CONSTRUCTION, OR NOT
INDICATED ON "AS-BUILT" DRAWINGS OR BURIED OR EMBEDDED IN
STRUCTURE OR SLAB.
7.CAREFULLY PROTECT ALL WALLS, TRIM, FLOOR, EQUIPMENT, UTILITY LINES
AND MATERIALS. WHEN WORKING ON FINISHED SURFACES, LIMIT DAMAGE
TO THE SMALLER AREA IF POSSIBLE AND RESTORE TO THE ORIGINAL
CONDITION ALL SURFACES WHICH ARE DAMAGED BECAUSE OF THE
INSTALLATION OF THIS WORK.
8.EQUIPMENT, MATERIALS AND SUPPLIES TEMPORARILY REMOVED FOR
PROTECTION SHALL BE REPLACED IN ORIGINAL LOCATIONS. ANY MATERIALS
DAMAGED SHALL BE REPLACED WITH NEW MATERIALS OF LIKE KIND AND
QUALITY.
9.DEMOLITION WORK SHALL BE DONE IN A MANNER WHICH WILL NOT CAUSE
UNNECESSARY INCONVENIENCE OR DANGER TO USERS OF THE PREMISES
AND ADJACENT SITE/SPACE, AND NOT INTERFERE IN ADVANCE.
10.DO ALL DRILLING, CUTTING, ETC. REQUIRED TO DEMOLISH ELECTRICAL
WORK AS INDICATED OR PROVIDE BLANK COVER PLATES ON ALL OUTLETS
EXPOSED BY REMOVAL OF FIXTURE OR DEVICES.
11.RESEAL ALL PENETRATIONS OR OPENINGS TROUGH WALLS, CEILINGS,
FLOORS, ETC., TO MAINTAIN RATING OF STRUCTURE OR DEVICES.
12.CONTRACTOR SHALL FIELD VERIFY EXISTING CONDUIT/WIRING RUNS,
REUSE AS REQUIRED, AND REMOVE ALL UNUSED CONDUIT /WIRING.
UNUSED CONDUIT IN INACCESSIBLE LOCATIONS (WALLS TO REMAIN) MAY BE
ABANDONED IN PLACE. REMOVE UNUSED WIRING INCLUDING ABANDONED
TELEPHONE, DATA AND OTHER LOW VOLTAGE SYSTEMS CABLING AFTER
CONFIRMING WITH THE OWNER REPRESENTATIVE THAT CABLING IS
ABANDONED AND WILL NOT RE REUSED.
13.CONTRACTOR TO VERIFY CIRCUIT NUMBER AND LOADS FOR ALL EXISTING
EQUIPMENT PRIOR TO INSTALLATION OF NEW OR RELOCATED ELECTRICAL
EQUIPMENT. REASSIGN CIRCUITS AND LOADS ACCORDINGLY. PROVIDE
COMPLETE "AS-BUILT" DRAWINGS AND TYPEWRITTEN DIRECTORIES FOR
PANELBOARDS.
14.WHERE NECESSARY TO SHUT OFF UTILITY SERVICES OR CAUSE
INTERRUPTION TO POWER OR SIGNAL SYSTEMS WHILE A BUILDING/SPACE IS
OCCUPIED OR THAT AFFECT ADJACENT BUILDINGS, SCHEDULE OUTAGES
OR INTERRUPTIONS WITH THE ARCHITECT PRIOR TO CONDUCTING
OUTAGE(S).
15.PROVIDE CONSTRUCTION POWER DURING PHASE OF DEMOLITION AND
CONSTRUCTION.
KEYNOTES:
SCOPE OF WORK AREA. CONTRACTOR TO DEMOLISH ALL RECEPTACLES, DATA OUTLETS, SURFACE MOUNTED RACEWAYS,
AND OTHER ELECTRICAL DEVICES INSIDE SCOPE OF WORK UNLESS NOTED OTHERWISE WITH (E) FOR EXISTING TO REMAIN
AND BE PROTECTED IN PLACE. ALL AREAS OUTSIDE OF THE SCOPE OF WORK SHALL NOT BE AFFECTED. CONTRACTOR SHALL
RUN ADDITIONAL CONDUIT AND CONDUCTORS AS REQUIRED TO ENSURE THERE ARE NO OUTAGES IN SPACES OUTSIDE OF
PROJECT AREA.
1
SCOPE OF WORK 1
NORTH ARROW
N
1
M-5
DETAIL IDENTIFICATION NUMBER
SHEET ON WHICH DETAIL IS
DRAWN
A
M-5
SECTION OR ELEVATION IDENTIFICATION
LETTER
SHEET ON WHICH SECTION OR ELEVATION IS
DRAWN
EQUIPMENT ABBREVIATION (SEE
ABBREVIATION LIST)
EQUIPMENT NUMBER
AC
1
REVISION CLOUD
#
#
#KEYNOTE
REVISION
#
POINT OF CONNECTION (POC)
POINT OF DISCONNECTION (POD)
NEW WORK LINETYPE
EXISTING WORK LINETYPE
DEMOLITION WORK LINETYPE
DUCT SECTION, SUPPLY
(POSITIVE)
DUCT SECTION, RETURN
(NEGATIVE)
DUCT SECTION, EXHAUST
(NEGATIVE)
DIRECTION OF FLOW
DUCT SIZE, WHERE FIRST DIMENSION IS
VISIBLE DUCT
24"X12"
CHANGE OF ELEVATION; RISE (R) / DROP (D)R
DUCTWORK, DOUBLE LINE
ACOUSTICAL LINED DUCTWORK, DOUBLE
LINE. SIZE IS NET INSIDE DIMENSION
FLEX DUCT / FLEXIBLE EQUIPMENT
CONNECTION, DOUBLE LINE
DUCTWORK, SINGLE LINE
ACOUSTICAL LINED DUCTWORK, SINGLE LINE.
SIZE IS NET INSIDE DIMENSION
FLEX DUCT, SINGLE LINE
CEILING SUPPLY DIFFUSER, 4-WAY BLOW
PATTERN
CEILING SUPPLY DIFFUSER, 3-WAY BLOW
PATTERN
CEILING RETURN REGISTER
CEILING EXHAUST GRILL
CD-1
200 AIR INLET/OUTLET IDENTIFICATION
DIFFUSER/REGISTER NUMBER
AIRFLOW QUANTITY
DOOR UNDERCUT
1 INCH UC
100 CFM
UNDERCUT SIZE
AIRFLOW QUANTITY
GENERAL NOTESMECHANICAL ABBREVIATIONS
- A -
AAV AUTOMATIC AIR VENT
ABV ABOVE
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
ALUM ALUMINUM
AO ANALOG OUTPUT
AP ACCESS PANEL
AS AIR SEPARATOR
- B -
B BOILER
BDD BACK DRAFT DAMPER
BEL BELOW
BFC BELOW FINISHED CEILING
BFP BACK FLOW PREVENTER
BHP BRAKE HORSEPOWER
BLDG BUILDING
BOB BOTTOM OF BEAM
BOP BOTTOM OF PIPE
BTU BRITISH THERMAL UNIT
- C -
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHWP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CL CENTER LINE
CLG CEILING
CP CONDENSATE PUMP
CT COOLING TOWER
CU CONDENSING UNIT
CV CONDENSATE VOLUME BOX
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
- D -
D DEMOLISH
DB DRY BULB
DEG DEGREES
DI DIGITAL INPUT
DIA DIAMETER
DL DOOR LOUVER
DN DOWN
DO DIGITAL OUPUT
DP DIFFERENTIAL PRESSURE
DS DUCT SILENCER
DWP DOMESTIC WATER PUMP
DX DIRECT EXPANSION
- E -
EA EACH
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EFF EFFICIENCY
EL ELEVATION
EQ EQUAL
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EXIST / (E)EXISTING
- F -
°F DEGREES FARENHEIT
FA FREE AREA
FC FAN COIL UNIT
FD FIRE DAMPER
FG FILTER GRILLE
FLA FULL LOAD AMPS
FLR FLOOR
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FPI FINS PER INCH
FPM FEET PER MINUTE
FS FLOW SWITCH
FT FEET / FOOT
-G -
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
- H -
HD HEAD
HP HEAT PUMP
HP HORSEPOWER
HWP HOT WATER PUMP
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
MECHANICAL SYMBOLS
MECHANICAL SHEET INDEX
APPLICABLE CODES
CALIFORNIA CODES ENFORCED THE AUTHORY HAVING
JURISDICTION:
A. 2022 CALIFORNIA BUILDING CODE.
B. 2022 CALIFORNIA MECHANICAL CODE.
C. 2022 CALIFORNIA PLUMBING CODE.
D. 2022 CALIFORNIA ELECTRICAL CODE.
E. 2022 GREEN BUILDING CODE.
F. 2022 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARD
FOR NONRESIDENTIAL COMPLIANCE.
G. NFPA STANDARDS APPLICABLE TO PROJECT.
1. FLEXIBLE DUCT NO MORE THAN 5 FEET IN LENGTH MAY BE
USED TO CONNECT SUPPLY, AIR TERMINAL DEVICES TO RIGID
DUCT SYSTEMS. AN INTERNAL IMPERVIOUS LINER SHALL BE
PROVIDED TO ISOLATE INSULATION MATERIAL FOR
CONDITIONED AIR. SECTION 602.6.1 OF THE 2019 CMC
2. MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL BE
NONCOMBUSTIBLE OR SHALL HAVE A FLAME-SPREAD INDEX
NOT GREATER THAN TWENTY FIVE (25) AND A SMOKE
DEVELOPED INDEX NOT GREATER THAN FIFTY (50) WHEN
TESTED AS COMPOSITE PER APPLICABLE TESTING STANDARD.
3. CONTRACTOR TO PROVIDE MANUFACTURER'S FIELD
FABRICATION AND INSTALLATION INSTRUCTION FOR ALL DUCT
SUPPORT. SECTION 603.8 OF THE 2019 CMC.
4. BALANCING AND ADJUSTING: ALL AIR SYSTEMS SHALL BE
ADJUSTED BY AN INDEPENDENT BALANCING CONTRACTOR
THAT IS A MEMBER OF THE ASSOCIATED AIR BALANCING
COUNCIL(AABC) . SUBMIT BALANCE REPORT TO UNIVERSITY
PRIOR TO RECEIVING FINAL PAYMENT. ADDITIONAL BALANCING
DAMPERS AND/OR PULLEY CHANGES SHALL BE PROVIDED AS
REQUIRED TO BALANCE SYSTEMS, AT NO INCREASE IN
CONTRACT PRICE.
5. AIR BALANCING CONTRACTOR TO COORDINATE WITH
CONTROLS CONTRACTOR FOR ADJUSTING AIR SYSTEM
INCLUDING BUT NOT LIMITED TO ALL SUPPLY, RETURN AND
EXHAUST FANS TO MAINTAIN PROPER AIR BALANCE. PROVIDE
AIR BALANCE REPORT TO VERIFY THE PROPER AMOUNT OF
OUTSIDE AIR TO COMPLY WITH 2019 CMC, BEFORE THE
APPROVAL OF THIS PROJECT.
6. EQUIPMENT SHALL BE SECURELY FASTENED TO VIBRATION
ISOLATORS AND SEISMIC RESTRAINTS PER CALIFORNIA
BUILDING CODE REQUIREMENTS.
7. ANCHORAGE AND SUPPORTING STRUCTURAL ELEMENTS FOR
AIR DUCTS AND PIPING SHALL BE DESIGNED TO WITHSTAND
THE LATERAL FORCES AS REQUIRED BY THE CALIFORNIA
BUILDING CODE, CALIFORNIA MECHANICAL CODE AND SMACNA.
8. WORKMANSHIP: THE WORK SHALL BE ACCOMPLISHED IN A
THOROUGH AND WORKMAN-LIKE MANNER SATISFACTORY TO
AND MEETING THE APPROVAL OF THE UNIVERSITY.
9. MATERIALS: ALL MATERIALS, APPLIANCES AND EQUIPMENT
SHALL BE NEW AND THE BEST OF THEIR RESPECTIVE KIND,
FREE FROM ALL DEFECTS AND OF THE MAKE, BRAND AND
QUALITY SPECIFIED.
10. AS-BUILTS: CONTRACTOR SHALL PROVIDE A COMPLETE SET
OF AS-BUILT FULL SIZE BLACK-LINE PRINTS WITH ALL CHANGES
NOTED THEREON AT THE COMPLETION OF THE PROJECT AND
PRIOR TO FINAL ACCEPTANCE AND PAYMENT.
11. SUBMITTALS: CATALOG INFORMATION, EQUIPMENT CUT
SHEETS AND LISTING OF ALL MECHANICAL EQUIPMENT,
COMPONENTS AND DEVICES SHALL BE SUBMITTED FOR
REVIEW (PDF FORMAT) INCLUDING PERFORMANCE DATA. ALL
SHALL BE LABELED AND IDENTIFIED PROPERLY.
12. BEFORE STARTING ANY WORK, THE CONTRACTOR FOR THIS
SECTION OF THE WORK SHALL EXAMINE A COMPLETE SET OF
DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL,
HVAC, ELECTRICAL, FIRE PROTECTION, STRUCTURAL, CIVIL
AND PLUMBING. DIMENSIONS, SPACE REQUIREMENTS AND
POINTS OF CONNECTION TO ALL EQUIPMENT SHALL BE
VERIFIED, AND ANY MINOR ADJUSTMENTS NECESSARY TO
AVOID CONFLICT WITH THE BUILDING STRUCTURE AND THE
WORK OF THE OTHER TRADES SHALL BE MADE.
13. ALL EXHAUST DUCTWORK SHALL BE SOLID SHEET METAL.
-I -
ICW INDUSTRIAL COLD WATER
ID INSIDE DIAMETER
IN INCHES
IW INDIRECT WASTE
-L -
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LD LINEAR DIFFUSER
LF LINEAR FEET
LWT LEAVING WATER TEMPERATURE
-M -
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT
PROTECTION DEVICE
MUA MAKE UP AIR
-N -
NIC NOT IN CONTRACT
NPSHR NET POSITIVE SUCTION PRESSURE
REQUIRED
-O -
OAT OUTSIDE AIR TEMPERATURE
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OSA OUTSIDE AIR
-P -
PD PRESSURE DROP
PH PHASE
PR PRESSURE RELIEF
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSID POUNDS PER SQUARE INCH,
DIFFERENTIAL
PSIG POUNDS PER SQUARE INCH, GAUGE
PT PRESSURE TRANSMITTER
PTAC PACKAGED TERMINAL AIR
CONDITIONER
-R -
RA RETURN AIR
RAG RETURN AIR GRILLE
RAR RETURN AIR REGISTER
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RATED LOAD AMPS
RPM REVOLUTIONS PER MINUTE
-S -
SA SUPPLY AIR
SAR SUPPLY AIR REGISTER
SD SMOKE DAMPER
SF SUPPLY FAN
SP STATIC PRESSURE
SPEC SPECIFICATION
SS STAINLESS STEEL
STD STANDARD
-T -
TAD TRANSFER AIR DUCT
TDH TOTAL DYNAMIC HEAD
TEFC TOTALLY ENCLOSED FAN COOLED
TEMP TEMPERATURE
TG TRANSFER GRILLE
TI TEMPERATURE INDICATOR
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
-U -
UC UNDERCUT
UH UNIT HEATER
UON UNLESS OTHERWISE NOTED
-V -
V VOLTS
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THROUGH ROOF
-W -
W/WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
CAL GREEN BUILDING NOTES
1. THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING
CONSTRUCTION IF NECESSARY TO CONDITION THE BUILDING OR
AREAS OF ADDITION OR ALTERATION WITHIN THE REQUIRED
TEMPERATURE RANGE FOR MATERIAL AND EQUIPMENT
INSTALLATION. IF THE HVAC SYSTEM IS USED DURING
CONSTRUCTION, USE RETURN AIR FILTERS WITH A MINIMUM
EFFICIENCY REPORTING VALUE (MERV) OF 8, OR AN AVERAGE
EFFICIENCY OF 30 PERCENT. REPLACE ALL FILTERS IMMEDIATELY
PRIOR TO OCCUPANCY, OR, IF THE BUILDING IS OCCUPIED DURING
ALTERATION, AT THE CONCLUSION OF CONSTRUCTION. (CGBC
SECTION: 5.504.1, LATEST EDITION)
2. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE
CONSTRUCTION SITE UNTIL FINAL STARTUP OF THE HEATING,
COOLING AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER
RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE
COVERED WITH TAPE, PLASTIC, SHEET METAL OR OTHER METHODS
ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT
OF DUST, WATER AND DEBRIS WHICH MAY ENTER THE SYSTEM.
(CGBC SECTION: 5.504.3, LATEST EDITION)
3. IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY
OCCUPIED AREAS OF THE BUILDING WITH AIR FILTRATION MEDIA FOR
OUTSIDE AND RETURN AIR THAT PROVIDES AT LEAST A MINIMUM
EFFICIENCY REPORTING VALUE (MERV) OF 13. MERV 13 FILTERS
SHALL BE INSTALLED PRIOR TO OCCUPANCY, AND
RECOMMENDATIONS FOR MAINTENANCE WITH FILTERS OF THE SAME
VALUE SHALL BE INCLUDED IN THE OPERATION AND MAINTENANCE
MANUAL. (CGBC SECTION: 5.504.5.3, LATEST EDITION)
4. EXCEPTION TO CGBC SECTION: 5.504.5.3: AN ASHRAE 10-PERCENT TO
15-PERCENT EFFICIENCY FILTER SHALL BE PERMITTED FOR AN HVAC
UNIT MEETING THE 2019 CALIFORNIA ENERGY CODE HAVING 60,000
BTU/H OR LESS CAPACITY PER FAN COIL, IF THE ENERGY USE OF THE
AIR DELIVERY SYSTEM IS 0.4 W/CFM OR LESS AT DESIGN AIR FLOW.
5. INSTALLED FILTERS SHALL BE CLEARLY LABELED BY THE
MANUFACTURER INDICATING THE MERV RATING. (CGBC SECTION:
5.504.5.3.1, LATEST EDITION)
6. WHERE OUTDOOR AREAS ARE PROVIDED FOR SMOKING, PROHIBIT
SMOKING WITHIN 25 FEET OF BUILDING ENTRIES, OUTDOOR AIR
INTAKES AND OPERABLE WINDOWS AND WITHIN THE BUILDING AS
ALREADY PROHIBITED BY OTHER LAWS OR REGULATIONS; OR AS
ENFORCED BY ORDINANCES, REGULATIONS OR POLICIES OF ANY
CITY, COUNTY, CITY AND COUNTY, CALIFORNIA COMMUNITY COLLEGE,
CAMPUS OF THE CALIFORNIA STATE UNIVERSITY, OR CAMPUS OF THE
UNIVERSITY OF CALIFORNIA, WHICHEVER ARE MORE STRINGENT.
WHEN ORDINANCES, REGULATIONS OR POLICIES ARE NOT IN PLACE,
POST SIGNAGE TO INFORM BUILDING OCCUPANTS OF THE
PROHIBITIONS. (CGBC SECTION: 5.504.7, LATEST EDITION)
7. FOR MECHANICALLY OR NATURALLY VENTILATED SPACES IN
BUILDINGS, MEET THE MINIMUM REQUIREMENTS OF SECTION 120.1
(REQUIREMENTS FOR VENTILATION) OF THE 2019 CALIFORNIA ENERGY
CODE, OR THE APPLICABLE LOCAL CODE, WHICHEVER IS MORE
STRINGENT, AND DIVISION 1, CHAPTER 4 OF CCR, TITLE 8. (CGBC
SECTION: 5.506.1, LATEST EDITION)
8. FOR BUILDINGS OR ADDITIONS EQUIPPED WITH DEMAND CONTROL
VENTILATION, CO2 SENSORS AND VENTILATION CONTROLS SHALL BE
SPECIFIED AND INSTALLED IN ACCORDANCE WITH THE
REQUIREMENTS OF 2019 CALIFORNIA ENERGY CODE, SECTION
120.1(C)(4). (CGBC SECTION: 5.506.2, LATEST EDITION)
9. DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND
ADJUSTING SYSTEMS. SYSTEMS TO BE INCLUDED FOR TESTING AND
ADJUSTING SHALL INCLUDE HVAC SYSTEMS AND CONTROLS. (CGBC
SECTION: 5.410.4.2, LATEST EDITION)
10. AFTER COMPLETION OF TESTING, ADJUSTING AND BALANCING,
PROVIDE A FINAL REPORT OF TESTING SIGNED BY THE INDIVIDUAL
RESPONSIBLE FOR PERFORMING THESE SERVICES. (CGBC SECTION:
5.410.4.4, LATEST EDITION)
11. PROVIDE THE UNIVERSITY'S REPRESENTATIVE WITH DETAILED
OPERATING AND MAINTENANCE INSTRUCTIONS AND COPIES OF
GUARANTIES/WARRANTIES FOR EACH SYSTEM. O & M INSTRUCTIONS
SHALL BE CONSISTENT WITH OSHA REQUIREMENTS IN CCR, TITLE 8,
SECTION 5142, AND OTHER RELATED REGULATIONS. (CGBC SECTION:
5.410.4.5, LATEST EDITION)
12. INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS
REQUIRED BY THE ENFORCING AGENCY. (CGBC SECTION: 5.410.4.5.1,
LATEST EDITION)
13. PERFORM TESTING AND ADJUSTING PROCEDURES IN ACCORDANCE
WITH MANUFACTURER'S SPECIFICATIONS AND APPLICABLE
STANDARDS ON EACH SYSTEM. (CGBC SECTION: 5.410.4.3, LATEST
EDITION)
14. IN ADDITION TO TESTING AND ADJUSTING, BEFORE A NEW SPACE-
CONDITIONING SYSTEM SERVING A BUILDING OR SPACE IS OPERATED
FOR NORMAL USE, BALANCE THE SYSTEM IN ACCORDANCE WITH THE
PROCEDURES DEFINED BY THE TESTING ADJUSTING AND BALANCING
BUREAU NATIONAL STANDARDS; ASSOCIATED AIR BALANCE COUNCIL
NATIONAL STANDARDS OR AS APPROVED BY THE ENFORCING
AGENCY. (CGBC SECTION: 5.410.4.3.1, LATEST EDITION)
15. DUCT AND PLENUM MATERIALS.
1. FACTORY-FABRICATED DUCT SYSTEM.
A. ALL FACTORY-FABRICATED DUCT SYSTEMS SHALL COMPLY WITH UL
181 FOR DUCTS AND CLOSURE SYSTEMS, INCLUDING COLLARS,
CONNECTIONS AND SPLICES, AND BE LABLED AS COMPLYING WITH UL
181.UL 181 TESTING MAY BE PERFORMED BY UL LABORATORIES OR A
LABORATORY APPROVED BY THE EXECUTIVE DIRECTOR.
B. ALL PRESSURE-SENSITIVE TAPES, HEAT-ACTIVATED TAPES, AND
MASTICS USED IN THE MANUFACTURE OF RIGID FIBERGLASS DUCTS
SHALL COMPLY WITH UL 181 AND UL 181A.
C. ALL PRESSURE-SENSITIVE TAPES AND MASTICS USED WITH FLEXIBLE
DUCTS SHALL COMPLY WITH UL 181 AND UL 181B.
D. ALL DUCTWOR AND PLENUMS WITH PRESSURE CLASS RATINGS
SHALL BE CONSTRUCTED TO SEAL CLASS A.JOINTS AND SEAMS OF
DUCT SYSTEMS AND THEIR COMPONENTS SHALL NOT BE SEALED
WITH CLOTH-BACK RUBBER ADHESIVE DUCT TAPES UNLESS SUCH
TAPE IS USED IN COMBINATION WITH MASTIC AND DRAWBANDS.
EXCEPTION TO SECTION 120.4(b)1D: DUCTWORK LOCATED IN
OCCUPIED SPACE AND EXPOSED TO VIEW IS NOT REQUIRED TO MEET
SEAL CLASS A.
SCOPE OF WORK
• PROVIDE NEW HVAC SYSTEM BASED ON SPLIT SYSTEM HEAT
PUMP UNITS.
• PROVIDE NEW AIR DISTRIBUTION BASED ON NEW FLOOR PLAN
LAYOUT
• PROVIDE NEW EXHAUST FAN FOR NEW RESTROOMS
1. DUCT AND PLENUM MATERIALS.
1. FACTORY-FABRICATED DUCT SYSTEM.
a. ALL FACTORY-FABRICATED DUCT SYSTEMS SHALL COMPLY
WITH UL 181 FOR DUCTS AND CLOSURE SYSTEMS, INCLUDING
COLLARS, CONNECTIONS AND SPLICES, AND BE LABLED AS
COMPLYING WITH UL 181.UL 181 TESTING MAY BE PERFORMED
BY UL LABORATORIES OR A LABORATORY APPROVED BY THE
EXECUTIVE DIRECTOR.
b. ALL PRESSURE-SENSITIVE TAPES, HEAT-ACTIVATED TAPES,
AND MASTICS USED IN THE MANUFACTURE OF RIGID
FIBERGLASS DUCTS SHALL COMPLY WITH UL 181 AND UL 181A.
c. ALL PRESSURE-SENSITIVE TAPES AND MASTICS USED WITH
FLEXIBLE DUCTS SHALL COMPLY WITH UL 181 AND UL 181B.
d. ALL DUCTWOR AND PLENUMS WITH PRESSURE CLASS RATINGS
SHALL BE CONSTRUCTED TO SEAL CLASS A.JOINTS AND
SEAMS OF DUCT SYSTEMS AND THEIR COMPONENTS SHALL
NOT BE SEALED WITH CLOTH-BACK RUBBER ADHESIVE DUCT
TAPES UNLESS SUCH TAPE IS USED IN COMBINATION WITH
MASTIC AND DRAWBANDS.
EXCEPTION TO SECTION 120.4(b)1D: DUCTWORK LOCATED IN
OCCUPIED SPACE AND EXPOSED TO VIEW IS NOT REQUIRED TO
MEET SEAL CLASS A.
2. DUCTSEALING.DUCT SYSTEMS SHALL COMPLY WITH SUBSECTION
1 OR 2 BELOW:
1. NEW DUCT SYSTEMS THAT MEET THE CRITERIA IN SUBSECTIONS
A,B,C AND D BELOW SHALL BE SEALED TO A LEAKAGE RATE NOT
TO EXCEED 6 PERCENT OF THE NOMINAL AIR HANDLER AIRFLOW
RATE AS CONFIRMED THROUGH HERS FIELD VERIFICATION AND
DIAGNOSTIC TESTING, IN ACCORDANCE WITH REFERENCE
NONRESIDENTIAL APPENDIX NA7.5.3;
a. THE DUCT SYSTEM DOES NOT SERVE A HEALTHCARE FACILITY;
AND
b. THE DUCT SYSTEM PROVIDES CONDITIONED AIR TO AN
OCCUPIABLE SPACE FOR CONSTANT VOLUME, SINGLE ZONE,
SPACE-CONDITIONING SYSTEMS; AND
c. THE SPACE-CONDITIONING SYSTEM SERVES LESS THAN 5,000
SQUARE FEET OF CONDITIONED FLOOR AREA; AND
d. THE COMBINED SURFACE AREA OF THE DUCT LOCATED
OUTDOORS OR IN UNCONDITIONED SPACE IS MORE THAN 25
PERCENT OF THE TOTAL SURFACE AREA OF THE ENTIRE DUCT
SYSTEM.
2. NEW DUCT SYSTEMS THAT ARE NOT SUBJECT TO TESTING
UNDER SECTION 120.4(g)1 SHALL INSTEAD MEET THE DUCT
LEAKAGE TESTING REQUIREMENTS OF CMC SECTION 603.9.2.
3. OCCUPANT SENSOR VENTILATION CONTROL DEVICES.
OCCUPANT SENSING OR VENTILATION CONTROLS ARE REQUIRED
FOR SPACE-CONDITIONING ZONES THAT ARE BOTH PERMITTED TO
HAVE THEIR VENTILATION AIR REDUCED TO ZERO WHILE IN
OCCUPIED-STANDBY MODE PER TABLE 120.1-A AND REQUIRED TO
INSTALL OCCUPANT SENSORS TO COMPLY WITH SECTION
130.1(c)5,6 AND 7. OCCUPANT SENSOR VENTILATION CONTROL
DEVICES USED TO REDUCE THE RATE OF OUTDOOR AIR FLOW WHEN
OCCUPANTS ARE NOT PRESENT SHALL COMPLY WITH THE
FOLLOWING:
a. OCCUPANT SENSORS SHALL HAVE SUITABLE COVERAGE AND
PLACEMENT TO DETECT OCCUPANTS IN THE ENTIRE SPACE
VENTILATED. IN 20 MINUTES OR LESS AFTER NO OCCUPANCY IS
DETECTED BY ANY SENSORS COVERING THE ROOM, OCCUPANT
SENSING CONTROLS SHALL INDICATE A ROOM IS VACANT.
b. WHEN OCCUPANT SENSORS CONTROLLING LIGHTING ARE ALSO
USED FOR VENTILATION, THE VENTILATION SIGNAL SHALL BE
INDEPENDENT OF DAYLIGHTING, MANUAL LIGHTING OVERRIDES
OR MANUAL CONTROL OF LIGHTING.
c. WHEN A SINGLE ZONE DAMPER OR A SINGLE ZONE SYSTEM
SERVES MULTIPLE ROOMS, THERE SHALL BE AN OCCUPANT
SNSOR IN EACH ROOM AND THE ZONE SHALL NOT BE
CONSIDERED VACANT UNTIL ALL ROOMS IN THE ZONE ARE
VACANT.
d. ONE HOUR PRIOR TO NORMAL SCHEDULED OCCUPANCY, THE
OCCUPANT SENSOR VENTILATION CONTROL SHALL ALLOW PRE-
OCCUPANCY PURGE AS DESCRIBED IN SECTION 120.1(d)2.
e. WHEN THE ZONE IS SCHEDULED TO BE OCCUPIED AND
OCCUPANT SENSING CONTROLS IN ALL ROOMS AND AREAS
SERVED BY THE ZONE INDICATE THE SPACES ARE UNOCCUPIED,
THE ZONE SHALL BE PLACED IN OCCUPIED-STANDBY MODE.
f. IN 5 MINUTES OR LESS AFTER ENTERING OCCUPIED-STANDBY
MODE, MECHANICAL VENTILATION TO THE ZONE SHALL BE SHUT
OFF UNTIL THE SPACE BECOMES OCCUPIED OR UNTIL
VENTILATION IS NEEDED TO PROVIDE SPACE HEATING OR
CONDITIONING. WHEN MECHANICAL VENTILATION IS SHUTT OFF
TO THE ZONE, THE VENTILATION SYSTEM SERVING THE ZONE
SHALL REDUCE THE SYSTEM OUTSIDE AIR RATE BY THE AMOUNT
OF OUTSIDE AIR REQUIRED FOR THE ZONE.
g. WHERE THE SYSTEM PROVIDING SPACE CONDITIONING ALSO
PROVIDES VENTILATION TO THE ZONE, IN 5 MINUTES OR LESS
AFTER ENTERING OCCUPIED-STANDBY MODE, SPACE-
CONDITIONING ZONE SETPOINTS SHALL BE RESET IN
ACCORDANCE WITH SECTION 120.2(e)3.
PLAN CHECK NOTES
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
4
3
A
M
M0.1
MECHANICAL
COVER SHEET
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
NO.NAME
M0.1 MECHANICAL COVER SHEET
M0.2 MECHANICAL SCHEDULES
M1.0 MECHANICAL ZONING PLAN
M2.0 MECHANICAL NEW FLOOR PLAN
M3.0 MECHANICAL NEW ROOF PLAN
M4.1 MECHANICAL DETAILS
M4.2 MECHANICAL DETAILS
M5.0 TITLE 24
M5.1 TITLE 24
M5.2 TITLE 24
M5.3 TITLE 24
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
ASHRAE 15 CALCULATION
MARK
TABLE 1102.3
REFRIGERANT
R-410A
(LBS/1000 FT^3)
REFRIGERANT
R-410A
SYSTEM
CHARGE (LBS)
ROOM
(FT^3)COMPLY?
26 8.42 95X10=950 24.7 YESCU
1
ALLOWABLE
AMOUNT OF
REFRIGERANT
(LBS)
26 13.53 95X10=950 24.7 YESCU
2
26 8.33 116X10=1160 30.2 YESCU
3
26 6.54 116X10=1160 30.2 YESCU
4
EF
1
EF
2
EXHAUST FAN SCHEDULE
GRILLES, REGISTERS & DIFFUSERS
MARK MANUFACTURER
& MODEL NECK SIZE FACE SIZE AIRFLOW
RANGE (CFM)
MAX. NECK
VELOCITY TYPE MAX.
N.C.DAMPER REMARKS
CD-1 TITUS
MCD
6"X6"
8"X8"
10"X10"
12"X12"
24"X24"
0 - 125
126 - 222
223 - 345
346 - 500
500
TWO
HORIZONTAL
DISCHARGE
PATTERNS
20 MVD HARDLID - SUPPLY AIR
CD-2 TITUS
PMC
6"X6"
8"X8"
10"X10"
12"X12"
24"X24"
0 - 125
126 - 222
223 - 345
346 - 500
500 PERFORATED 24 MVD T-BAR CEILING - SUPPLY AIR
CD-3 TITUS
300RL - 8"X8" - - - 13 - HARDLID CEILING - SUPPLY AIR
SD-1 TITUS
300RL - 12"X12" - - - 16 MVD WALL MOUNTED - SUPPLY AIR
RG-1 TITUS
PAR
6"X6"
8"X8"
10"X10"
12"X12"
24"X24"
0 - 125
126 - 222
223 - 345
346 - 500
500 PERFORATED 25 - T-BAR CEILING - RETURN AIR
RG-2 TITUS
350RL - 22"X22" - - - 17 MVD HARDLID CEILING - RETURN AIR
EG-1 TITUS
350RL -
6"X6"
8"X6"
8"X8"- - - 13 HARDLID - EXHAUST AIR
TG-1 TITUS
300RL - 8"X8" - - - 13 - HARDLID - TRANSFER AIR
TG-2 TITUS
350RL - 8"X8" - - - 16 - HARDLID - TRANSFER AIR
NOTES :
COLOR AS PER PROJECT ARCHITECT'S REQUIREMENTS.
TAG
NOTES
1. STARTER AND FUSED DISCONNECT PROVIDED BY ELECTRICAL CONTRACTOR.
2. PROVIDE NON-OVERLOADING MOTOR.
3. PROVIDE NEMA PREMIUM EFFICIENCY MOTOR.
4. PROVIDE BACKDRAFT DAMPER, FACTORY ROOF CURB, & SPEED CONTROLLER.
5. EXHAUST FAN TO BE CONTROLLED BY TIMECLOCK.
MFR &
MODEL
GREENHECK
LOCATION
ROOF
AREA SERVED
RESTROOM- 07,09
DISCH
DOWNBLAST
TYPE
CENTRIFUGAL
DRIVE
DIRECT
AIR FLOW
700
SP
(CFM)
0.5
FAN
RPM
1339
OPER.
WT.
(LBS)
41
NOTES
1-6
G-099-VG
6. PROVIDE WITH ROOF CAP.
JANITOR ROOM-12
RESTROOM- 11
(IN. WG.)
HP V/PH
ELECTRICAL
1/4 115/1
AIRKING CEILING SIDE CENTRIFUGAL DIRECT 135 0.2 982 13 1-3,7
AK110LS6
119 WATTS 120/1
7. EXHAUST FAN TO BE CONTROLLED BY LIGHT SWITCH.
VENTILATION CALCULATION
ZONE#SERVICES RP PZ RA AZ VBZ EZ VOZ TITLE 24 PROVIDED VENTILATION
FC-1 ENTRY / CHECK IN OFFICE - 01 5 2 0.06 219 23.1 0.8 28.9 33.0 35
MULTI PURPOSE ROOM A - 02 -PART 1 5 40 0.06 763 245.8 0.8 307.2 600.0 600
FC-2 MULTI PURPOSE ROOM B - 03 5 19 0.06 353 116.2 0.8 145.2 285.0 290
FC-3
MULTI PURPOSE ROOM A-PART 2 5 15 0.06 270 91.2 0.8 114.0 225.0 230
HALLWAY 04 0 0 0.06 106 6.4 0.8 8.0
34.0 35
HALLWAY 06 0 0 0.06 118 7.1 0.8 8.9
RESTROOM- WOMEN - 07 0 0 0.06 165 9.9 0.8 12.4 25.0 30
RESTROOM- MEN - 09 0 0 0.06 142 8.5 0.8 10.7 21.0 25
FC-4 MULTI PURPOSE ROOM C - 05 5 20 0.06 375 122.5 0.8 153.1 300.0 300
FC-5
OFFICE - 10 5 2 0.06 222 23.3 0.8 29.2 33.0 35
KITCHEN - 10 7.5 4 0.18 130 53.4 0.8 66.8 65.0 70
RESTROOM - 11 0 0 0.06 59 3.5 0.8 4.4 9.0 10
JANITOR - 12 0 0 0.06 36 2.2 0.8 2.7 5.0 5
TOTAL :1665 CFM
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
4
3
A
M
M0.2
MECHANICAL
SCHEDULES
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
FAN COIL UNIT SCHEDULE
TYPE TAG MANUFACTURER MODEL NOM.CAP.(TONS) AREA SERVED TYPE
EQUIP
SERVED
SUPPLY
AIR
ESP
(in.
wg)
OUTSIDE
AIR
ELECTRICAL
OPER WT.
(LBS)DIMENSIONS(W X H X D) NOTESV/PH MCA(A) MOCP(A)
FC 1 SAMSUNG AC048BNZDCH/AA 4 MULTI PURPOSE ROOM A DUCTED HORIZONTAL CU-1 1490 CFM 0.4 435 CFM 208/1 POWERED BY OUTDOOR UNIT POWERED BY OUTDOOR UNIT 166.4 24.5" X 58.75" X 21.75" 1
FC 2 SAMSUNG AM024TNZDCH/AA 2 MULTI PURPOSE ROOM B DUCTED HORIZONTAL CU-4 750 CFM 0.4 180 CFM 208/1 0.9 10 109 17 1/2" X 43" X 21" 1
FC 3 SAMSUNG AC048BNZDCH/AA 4 RESTMULTI PURPOSE ROOM A, HALLWAY,
RESTROOMS
DUCTED HORIZONTAL CU-3 1490 CFM 0.4 205 CFM 208/1 POWERED BY OUTDOOR UNIT POWERED BY OUTDOOR UNIT 166.4 24.5" X 58.75" X 21.75" 1
FC 4 SAMSUNG AM024TNZDCH/AA 2 MULTI PURPOSE ROOM C DUCTED HORIZONTAL CU-4 750 CFM 0.4 200 CFM 208/1 0.9 10 109 17 1/2" X 43" X 21" 1
FC 5 SAMSUNG AC024BNZDCH/AA 2 OFFICE AND KITCHEN DUCTED HORIZONTAL CU-5 750 CFM 0.4 115 CFM 208/1 POWERED BY OUTDOOR UNIT POWERED BY OUTDOOR UNIT 98.1 17 1/2" X 43" X 21" 1
CONDENSING UNIT SCHEDULE
TYPE TAG MANUFACTURER MODEL LOCATION
EQUIP
SERVED
NOM CAP
(TONS)SEER2 EER2 HSPF2
COOLING
TOTAL
MBH
HEATING
TOTAL
MBH REFRIGERANT
ELECTRICAL
DIMENSIONS (H X W X D)
OPER WT.
(LBS)NOTESV/PH HP MCA MOP
CU 1 SAMSUNG AC048BXADCH/AA ON THE
GROUND
FC-1 4 16.7 8.8 8.1 48000 53000 R410A 208/1 N/A 32.8 40 47 11/16" X 37" X 13" 195.1
CU 2 SAMSUNG AM048TXMDCH/AA ON THE WALL FC-2,FC-4 4 17.5 10.2 8.8 48000 54000 R410A 208/1 N/A 29 50 37" X 47 5/8" X 13"216.1
CU 3 SAMSUNG AC048BXADCH/AA ON THE
GROUND
FC-3 4 16.7 8.8 8.1 48000 53000 R410A 208/1 N/A 32.8 40 47 11/16" X 37" X 13" 195.1
CU 4 SAMSUNG AC024BXADCH/AA ON THE
GROUND
FC-5 2 16.9 9.7 7.9 24000 27000 R410A 208/1 N/A 24.1 30 39 5/16" X 37" X 13" 158.7
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
NOTES:
1.PROVIDE FILTER RACK WITH 2" MERV-13 FILTERS.
T
FC
-2
T
FC
-4
TFC-3
T FC-1
FC-2
FC-4
Schema 1 Legend
FC-1
FC-2
FC-3
FC-4
FC-5
A B C D E F
1
2
3
FC-3
FC-1
FC-5
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
4
3
A
M
M1.0
MECHANICAL
ZONING PLAN
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
1/4" = 1'-0"M1.0
1 MECHANICAL NEW FLOOR ZONING PLAN
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
REF.
T
FC
-2
T
FC
-4
TFC-3
T FC-1
T
FC
-5
1
2
3
A B C D E F
FC
1
FC
5
16"x16"
14"x14"
12"x12"
12"x12"
10"ø
10"ø
14"x14"16"x18"
10"x8"
12"x12"
12"ø
12"ø
FC
3
8"x8"
14"x8"
8"x8"8"x8"
10"x8"
8"ø
6"x6"8"x8"
10"x8"
6"ø
250
CD-1
(TYP. OF 3)
250
CD-1
(TYP. OF 3)
(TYP. OF 2)
217
CD-2
(TYP. OF 3)
1005
RG-2
390
SD-1
(TYP. OF 3)
1059
RG-2
130
TG-1
130
TG-2
160
CD-3
(TYP. OF 2)
54
EG-2
12"x12"
300
SD-1
(TYP. OF 4)
273
RG-1
12"x10"
OUTSIDE AIR
DUCT.
10"x8" OUTSIDE AIR
DUCT.
10"x8" OUTSIDE AIR
DUCT.
10"x8" OUTSIDE AIR
DUCT UP THRU THE
ROOF.
6"x6" OUTSIDE AIR
DUCT UP THRU THE
ROOF.
10"ø
14"x12"12"x14"12"x14"14"x12"
TRAINING ROOM
B
03
MULTI-PURPOSE
ROOM A
02
ENTRY / CHECK
IN OFFICE
01
HALLWAY
04
TRAINING ROOM
C
05
HALLWAY
06
WOMENS
07
MENS
09
OFFICE AND
BREAKROOM
10
RESTROOM
11
JANITOR
12
8"ø CU
1
41
2
3
5
200
CD-1
14
"
x
1
4
"
(TYP. OF 4)
6"x6"
80
CD-3
150
EG-1
(TYP. OF 4)
2
M2.0
150
TG-2
8"ø
10"ø
8"ø
8"ø
12
"
ø
8"
ø
8"ø
6
EF
2
7
6"ø
570
RG-2
12"ø
10"x8"
10"ø
30"x30" CEILING ACCESS PANEL
550
RG-2
12"ø
10"ø
10"ø
10"ø
CU
4
CU
2FC
4FC
2
CU
3
ROOF ACCESS
MULTI-PURPOSE
ROOM A
02
FINISH FLOOR
0"
ROOF
15' -0"
3
FINISH FLOOR
0' -0"
FINISH FLOOR
0' -0"
ROOF
15' -0"
ROOF
15' -0"
3
CU
4
CU
3
CU
2
CU
1
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
4
7
A
M
M2.0
MECHANICAL NEW
FLOOR PLAN
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
1/4" = 1'-0"M2.0
1 MECHANICAL FIRST FLOOR PLAN
KEY NOTES
1 OUTSIDE AIR VOLUME DAMPER SET @ 635 CFM
2 OUTSIDE AIR VOLUME DAMPER SET @ 290 CFM
3 OUTSIDE AIR VOLUME DAMPER SET @ 320 CFM
4 OUTSIDE AIR VOLUME DAMPER SET @ 300 CFM
5 OUTSIDE AIR VOLUME DAMPER SET @ 120 CFM
6 12"X12" EXHAUST AIR DUCT UP THRU THE ROOF TO EXHAUST FAN EF-1
7 6"⌀EXHAUST DUCT UP THRU THE ROOF. TERMINATE WITH ROOF CAP.
1/4" = 1'-0"M2.0
2 OUTDOOR UNITS LAYOUT SECTION
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
GENERAL NOTES
1. CONTRACTOR SHALL PROVIDE NEMA 3R WEATHERPROOF WIREMOLD OR EQUAL,
WITH SCREW COVER TO PROTECT REFRIGERANT PIPING. COORDINATE LAYOUT
AND LOCATIONS WITH ARCHITECT PRIOR TO ROUGH-IN, INSTALLATION, AND
PURCHASING OF MATERIAL. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR
LAYOUT FOR APPROVAL.
2. IN ADDITION TO TESTING AND ADJUSTING, BEFORE A NEW SPACE-CONDITIONING
SYSTEM SERVING A BUILDING OR SPACE IS OPERATED FOR NORMAL USE,
BALANCETHE SYSTEM IN ACCORDANCE WITH THE PROCEDURES DEFINED BY THE
TESTING ADJUSTING AND BALANCING BUREAU NATIONAL STANDARDS;
ASSOCIATED AIR BALANCE COUNCIL NATIONAL STANDARDS OR AS APPROVED BY
THE ENFORCING AGENCY.
3. HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS ( INCLUDING HYDRONIC
SYSTEMS) SHALL BE BALANCED IN ACCORDANCE WITH ONE OF THE FOLLOWING
METHODES; AABC,ACCA MANUAL B, ASHRAE 111, NEBB PROCEDURAL STANDARDS
OR SMACNA SYSTEMS TESTING.
1
2
3
A B C D E F
10"x8" OUTSIDE AIR
DUCT UP THRU THE
ROOF.
6"x6" OUTSIDE AIR
DUCT UP THRU THE
ROOF.
EF
1
6"⌀EXHAUST AIR
DUCT UP THRU THE
ROOF.
1
1
ROOF ACCESS
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
4
7
A
M
M3.0
MECHANICAL NEW
ROOF PLAN
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
1/4" = 1'-0"M3.0
1 MECHNICAL NEW ROOF PLAN
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
GENERAL NOTES
1. ALL ENVIRONMENTAL AIR OUTLETS SHALL TERMINATE 3 FEET FROM OPENINGS
INTO THE BUILDING, 3 FEET FROM PROPERTY LINE, 10 FEET FROM A FORCED AIR
INLET AND 10 FEET ABOVE PUBLIC WALKWAY.
KEY NOTES
1 OUTSIDE AIR INTAKE SHALL TERMINATE NOT LESS THAN 10FT FROM
EXHAUST AIR ROOF TERMINATION.
SCALE:
SCALE:
SCALE: SCALE:
SCALE:
SF
1
2x2x16GA ANGLE
5'-0" MAX
TO
STRUCTURAL
SUPPORT
36"Ø
MAX
3
DETAIL A
DETAIL B
6
5
4
3
2
1
NOTES:
HANGERS SHALL BE INSTALLED AT EVERY CHANGE OF DIRECTION AND NO MORE THAN 10'-0"
APART.
PROVIDE A FLEXIBLE CONNECTION BETWEEN MECHANICAL EQUIPMENT AND DUCT.
STRAP MAY BE REDUCED TO 1" X 22GA FOR DUCT 24"Ø AND LESS IN DIAMETER.
SEISMIC RESTRAINT CABLES MAY BE OMITTED WHERE DUCT IS SUPPORTED WITHIN 12" OF
STRUCTURE AS MEASURED FROM THE TOP OF DUCT TO THE BOTTOM OF STRUCTURE.
WHERE SEISMIC CABLE RESTRAINTS ARE REQUIRED,
A. PROVIDE SEISMIC CABLE TRANSVERSE BRACING AT 30 FT AND
B. SEISMIC CABLE LONGITUDINAL BRACING AT 60 FT.
C. SEISMIC CABLE RESTRAINTS ARE NOT REQUIRED AT EVERY HANGER LOCATION.
VERTICAL HANGERS, DIAGONAL AND HORIZONTAL BRACES TO BE SIZED IN ACCORDANCE
WITH SMACNA SEISMIC RESTRAINT MANUAL TABLE 5-6.
SIZE ANCHORS IN ACCORDANCE WITH SMACNA SEISMIC RESTRAINT MANUAL
TABLE 8 -1, TYPE C FOR CONCRETE AND TYPE A FOR ALL OTHERS.
AND NUT.
LOCKWASHER
3/8"Ø BOLT,
28"Ø
LESS THAN
1" X 20 GA STRAP
4 5
6
1 2
21
1/4" SEISMIC
RESTRAINT CABLE TO
STRUCTURE (TYP)
1"
1/2"
EXCESS CABLE
MIN 1" (TYP)
CROSBY FORGED
WIRE ROPE CLIP.
INSTALL TWO PER
CABLE END (TYP)
3/8"Ø BOLT,
LOCKWASHER
AND NUT.
1 MIN
2 MAX
1
2-1/2"x12GA STRAP
1 MIN
2 MAX
1
SHOWN WITH TRANSVERSE BRACING SHOWN WITH LONGITUDINAL BRACING
7
NONE
NONE
2'-8" MAX TO
STRUCTURAL
SUPPORT
CROSBY FORGED
WIRE ROPE CLIP.
INSTALL TWO PER
CABLE END (TYP)
1"
1/2"
EXCESS CABLE
MIN 1" (TYP)TWO 3/8"Ø LOCKNUTS AND
WASHERS
5
5
2
DETAIL B
DETAIL A
6
#10 SELF-TAPPING SHEET
METAL SCREWS, 4 MIN
30X30 MAX
2'-8" MAX TO
STRUCTURAL SUPPORT1" X 22 GA STRAP
(TYP)
RECTANGULAR DUCT
3
5
4
4
3
2
1
RECTANGULAR DUCT
3/8"Ø ROD OR OPTIONAL
3"X3"X16 GA ANGLE (TYP)
BOTH SIDES
45°
NOTES:
MAXIMUM SPACING OF HANGERS SHALL BE 5'-0".
IF A FLEXIBLE CONNECTION IS INSTALLED BETWEEN THE MECHANICAL EQUIPMENT AND THE
DUCT, THEN THIS DETAIL MAY BE USED. OTHERWISE, USE DETAIL B BELOW.
SEISMIC RESTRAINT CABLES MAY BE OMITTED WHERE:
A. THERE IS A FLEXIBLE CONNECTION BETWEEN THE MECHANICAL EQUIPMENT AND
B. RECTANGULAR DUCT IS LESS THAN 6 SQUARE FEET IN AREA OR
C. DUCT OF ANY SIZE IS SUPPORTED WITHIN 12" OF STRUCTURE AS MEASURED FROM THE
TOP OF DUCT TO THE BOTTOM OF STRUCTURE.
WHERE SEISMIC RESTRAINTS ARE REQUIRED,
A. PROVIDE TRANSVERSE BRACING AT 30 FT AND
B. LONGITUDINAL BRACING AT 60 FT.
VERTICAL HANGERS, DIAGONAL AND HORIZONTAL BRACES TO BE SIZED IN ACCORDANCE
WITH SMACNA SEISMIC RESTRAINT MANUAL TABLE 5-1 AND 5-2.
REFER TO STRUCTURAL DETAILS FOR ADDITIONAL INFORMATION NOT SHOWN HERE.
3"X3"X16 GA
1/4" CABLE TO
LOCKWASHER &
3/8"Ø BOLT,
NUT.
STRUCTURE
(TYP)
60X60 MAX
#10 SELF-TAPPING
SHEET METAL SCREWS,
ONE PER SIDE
OUT OF AIR PATH.
NOTES:
1. SHEET METAL SCREWS, BOLTS, ETC. USED IN CONSTRUCTION
OF DAMPER MUST NOT INTERFERE WITH DAMPER BLADE
OPERATION.
2. FIRE DAMPER DETAIL FOR REFERENCE ONLY.
3. FIRE DAMPERS SHALL BE FIRE MARSHALL APPROVED AND
INSTALLED STRICTLY PER MANUFACTURER'S PRINTED
INSTRUCTIONS.
4. THE CONTRACTOR SHALL SUBMIT DRAWINGS OF THE ENTIRE
CEILING ENCLOSURE, INCLUDING THE FIRE DAMPER
INSTALLATION, AS PER MANUFACTURER'S RECOMMENDATION.
THE INSTALLATION SHALL COMPLY WITH UL AND IAW
APPLICABLE FIRE CODES.
5. ANGLES ALL AROUND SLEEVE ON BOTH SIDES OF PARTITION.
WELDED OR BOLTED TO SLEEVE WITH 1" FILLETS AT 5" O.C.
MAXIMUM. ANGLES ARE NOT ATTACHED TO WALL FRAMING
TO PROVIDE FOR EXPANSION. ANGLE SHALL OVERLAP WALL
FRAMING NOT LESS THAN 1". SEE MANUFACTURER'S
REQUIRMENTS FOR SIZE AND GAGE OF ANGLES.
1" MINIMUM OVERLAP
ON FOUR SIDES (TYP).
DOOR TO FUSIBLE LINK
GASKETED ACCESS
PRESSURE DUCTWORK.
TYPE JOINT FOR MEDIUM
APPROVED DUCTMATE
DUCT
EACH SIDE
3" MINIMUM ON
6" MAXIMUM AND
DAMPER.
MATCH GAGE OF FIRE
OF 16 GAGE (MIN.) OR
SLEEVE CONSTRUCTED
CONNECTIONS TO SLEEVE.
SECURED TO SLEEVE.
DAMPER WITH DAMPER
TYPE B CURTAIN FIRE
1/8" ANGLE IRON
WALL
SLEEVE
S-LOCK DUCT
NONE NONE
NONE
S.A. DUCT
FLEX CONN. (TYP.)
MERV 13
FILTER BOX
SPRING ISOLATOR
1" DEFLECTION
(TYP.)
1/4" CABLE TO
STRUCTURE
(TYP)
ROUND DUCT SUPPORT3
RECTANGULAR DUCT SUPPORT DETAIL2
FIRE DAMPER DETAIL4 DUCTWORK CONNECTIONS1
INLINE SUPPLY FAN DETAIL5
FLOW
AIR
NOTES:
1. USE FOR SYMBOL WHERE
BRANCH DUCT AIR QUANTITY IS
LESS THAN 25% OF THE TOTAL AIR
FLOW.
2. DEPTH OF MAIN DUCT MUST BE 2"
LARGER THAN CONICAL DIAMETER.
CONNECTION
ROUND TO ROUND
SUPPLY DUCT ROUND BRANCH DUCT
MANUAL DAMPER WITH LOCKING
QUADRANT WITH 2" STAND OFF
BRACKET
45° CLINCH COLLAR W/ MANUAL
DAMPER W/ LOCKING HAND
QUADRANT W/ 2" STAND-OFF
BRACKET
RECTANGULAR/
SQUARE BRANCH DUCTSUPPLY DUCT
NOTES:
1. USE FOR SYMBOL WHERE BRANCH DUCT AIR
QUANTITY IS LESS THAN 25% OF THE TOTAL AIR
FLOW.
2. DEPTH AT W' MUST BE LEAST 2" THAN DEPTH AT W.
RETURN/EXHAUST
W
AIR FLOW
W'
AIR FLOW
SUPPLY
45°
MAIN DUCT
CLINCH COLLAR
1/3W, 6" MINIMUM
BRANCH DUCT
VOLUME DAMPER SIMILAR TO ROUND
VOLUME DAMPER DETAIL
OUTSIDE RADIUS EQUAL TO 2 W'
INSIDE RADIUS EQUAL TO W'
NOTES:
SUPPLY
AIR FLOW
RETURN/EXHAUST
AIR FLOW
MAIN DUCT
W
BRANCH DUCT
AIR
FLOW
W'
VOLUME DAMPER SIMILAR TO
ROUND VOLUME DAMPER
DETAIL
1. USE FOR SYMBOL WHERE BRANCH DUCT AIR
QUANTITY IS MORE THAN 25% AND LESS THAN 50%
OF THE TOTAL AIR FLOW.
2. DEPTH OF DUCT FOR W AND W' SHOULD BE EQUAL.
SHEET METAL OR FLEXIBLE
DUCT AS SPECIFIED
ROUND VOLUME
DAMPER, SEE DETAIL
CONICAL TAP
MAIN DUCT
LONG RADIUS
SEE SMACNA
STANDARD
DUCT
MAIN DUCT
AIR FLOW
MANUAL DAMPER W/
LOCKING QUADRANT
BRANCH DUCT
TURNING VANES
SEE SMACNA
STANDARD
DUCT
DUCT
RECTANGULAR ELBOW
W
Ø=90°
R
O
H
W
NOTES:
1. MAXIMUM UNSUPPORTED VANE LENGTH 36"
2. VANES AND FRAMES - 24 GAUGE
3. DUCT INLET AND OUTLET DIMENSIONS TO BE EQUAL.
4. FOR HIGH VELOCITY APPLICATIONS, PROVIDE 18 GAUGE CHANNEL AND
TACK WELD VANE EDGES TO CHANNEL, TYPICAL BOTH ENDS.
5. FRAMES AND CHANNELS - BOLTED OR TACK WELDED TO ELBOW.
MIN. 24 GA. VANES
21/4" 21/4"
31/4"
21/4"R
41/2"R
45°45°
TURNING VANES
SPLITTER VANES
RECTANGULAR RADIUS ELBOW
H
SPLITTER VANES
RECTANGULAR 90° ELBOW
FL
O
W
AI
R
D
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
4
8
A
M
M4.1
MECHANICAL
DETAILS
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
SCALE:
SCALE:
SCALE:SCALE:
SCALE:
SCALE:
SWITCH, OUTLET,
CONTROL
TOP OF THERMOSTAT,
24" MAX.
34
"
M
A
X
.
48
"
M
A
X
.
OUTLET OR SWITCH
BOTTOM OF
15" MIN.
F.F.L.
46
"
M
A
X
.
S
I
D
E
A
P
P
R
O
A
C
H
44
"
M
A
X
.
F
R
O
N
T
A
P
P
R
O
A
C
H
SWITCH, OUTLET,
CONTROL
TOP OF THERMOSTAT,
NOTES
1. SUPPORTS SHALL BE INSTALLED A MAXIMUM 8'-0" O.C. AND AT
EACH CHANGE OF DIRECTION OF PIPING.
ROOF
MOUNTED
PIPING
"DURA-BLOCK"
SUPPORT SYSTEM
4" MIN. A.F.R.
RUBBER BASE
LOW VOLTAGE WIRING WIRING
LOW VOLTAGE
THERMOSTAT
NOTES:
DISCONNECT
208V-1Ø
FURNISHED & INSTALLED BY
INSTALLED BY ELECT. CONTRACTOR.
FURNISHED BY MECH. CONTRACTOR &
FURNISHED & INSTALLED BY
ELECT. CONTRACTOR
MECH. CONTRACTOR
IN 1/2" CONDUIT
1. MECHANICAL CONTRACTOR SHALL FIELD COORDINATE WITH
ELECTRICAL CONTRACTOR CONDUIT ROUTING AND INSTALLATION
DISCONNECT
208V-1Ø
USE VIBRATION ISOLATORS
MASON TYPE SLF WITH
APPROPRIATE SEISMIC
RESTRAINTS.
UNISTRUT CHANNEL
OIL TRAP
RETURN AIR
RETURN
PLENUM LINED
RETURN AIR
TRAP
FAN COIL ACCESS
DOOR MIN 30"x30"
3/4" SECONDARY CONDENSATE
DRAIN IN VISIBLE LOCATION.
CONTRACTOR TO COORDINATE
LOCATION WITH OWNER/ARCHITECT
3/4" PRIMARY
CON. DRAIN
COND. DRAIN TO LAVATORY
TAILPIECE OR APPROVED RECEPTOR
SUPPLY AIR
SUPPLY
PLENUM LINED
ONE HOUR RATING
ANCHOR PTS "A"
UNISTRUT CHANNEL
BRACKET
JOIST
1/4"Ø x 1-1/4"
HEX HEAD LAG BOLT
USE VIBRATION ISOLATORS
1/2" THICK ARMSTRONG
ARMAFLEX TYPE CLOSED
CELL FOAM WITH A STEEL
JACKET AT ALL
PENETRATIONS AND
SUPPORT POINTS.
REFRIGERANT SUCTION
AND LIQUID LINES
RS
RS
RL
RL
FLEXIBLE
CONNECTION
FC
-
CU
-
(FOR REFERENCE)
CU
--
NONE
SQUARE TO ROUND
STEEL LOCKING STRAP
CEILING
DUCT
TRANSITION
S.M. DUCT
STRAP
4" WIDE SHEET
OPPOSED BLADE
DAMPER
SQUARE TO ROUND
ADAPTER
CSD
ACOUSTICAL FLEX. TO STRUCTURE
12GA. WIRE
NONE
ANCHORED TO
ROOF LEVEL PAD
(TYP. OF 4)
TO FAN COIL UNIT
REFRIGERANT LINES
LEVEL PAD GROUND
NOTE:
EXTERIOR GAS LINE TO HAVE 3/4" ARMAFLEX INSULATION WRAPPED
WRAPPED W/ ALUMINUM JACKETING AND VAPOUR SEALED.
M
M
M
E
E
E
E
WIRING LEGEND
ME
M
E
E
E
E
E
NONENONE
NONE
NONE
CEILING DIFFUSER1
CONDENSING UNIT DETAIL ON THE GROUND4
SPLIT SYSTEM WIRING DIAGRAM3REFRIGERANT PIPING SUPPORT DETAIL5
THERMOSTAT MOUNTING DETAIL6 HORIZONTAL FAN COIL UNIT DETAIL2
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
4
8
A
M
M4.2
MECHANICAL
DETAILS
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
4
9
A
M
M5.0
TITLE 24
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
5
1
A
M
M5.1
TITLE 24
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
5
3
A
M
M5.2
TITLE 24
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
5
1
:
5
4
A
M
M5.3
TITLE 24
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 PERMIT SET 5/17/2024
4 BACK CHECK SET 1/15/2025
5 BACK CHECK SET_V2 4/08/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
4
2
:
4
1
A
M
P0.1
GENERAL NOTES,
ABBREIVIATIONS
AND SYMBOLS
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE CODES:
• 2022 CALIFORNIA PLUMBING CODE (CPC)
• 2022 CALIFORNIA BUILDING CODE
• 2022 CALIFORNIA MECHANICAL CODE
• 2022 CALIFORNIA ELECTRICAL CODE
• 2022 CALIFORNIA FIRE CODE
• CALIFORNIA STATE FIRE MARSHAL
• NFPA STANDARDS
• 2022 CALIFORNIA ENERGY CODE
• 2022 CALIFORNIA GREEN BUILDING STADARDS CODE (CGBSC)
• 2010 ADA STANDARS
• CALIFORNIA ADMINISTRATIVE CODES, TITLE 17 AND 24.
2.EXISTING CONDITIONS ARE BASED ON "AS-BUILT" DRAWINGS AND/OR LIMITED FIELD
VERIFICATIONS. THE CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT NO
ADDITIONAL EXPENSE TO THE PROJECT. NO ADDITIONAL COMPENSATION WILL BE
PROVIDED FOR ANY EXTRAS DUE TO THE CONTRACTO'S FAILURE TO VISIT THE PROJECT
SITE AND/OR PDETERMINATION OF EXISTING CONDITIONS PRIOR TO SUBMITTING THE BID.
ANY DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO THE OWNER FOR
RESOLUTION.
3.CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE INCIDENTAL DEMOLITION WORK
PRIOR TO BIDDING AND COMMENCEMENT OF WORK. THE CONTRACTOR IS RESPONSIBLE
FOR DEMOLITION OF ALL EXISTING EQUIPMENT AS REQUIRED FOR THE
INSTALLATION/CONSTRUCTION OF NEW WORK.
4.CONTRACTOR SHALL COORDIANTE WITH ALL OTHER TRADES FOR CLEARANCES AND
WORK INCLUDED PRIOR TO START OF WORK.
5.KEEP ALL PIPING CLEAR FROM LOAD BEARING FOOTINGS.
6.REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS, MOUNTING HEIGHTS, AND
COLORS OF ALL PLUMBING FIXTURES.
7.2019 CALIFORNIA GREEN BUILDING STADARDS CODE 5.303.6. PLUMBING FIXTURES AND
FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2019 CALIFORNIA PLUMBING
CODE AND SHALL MEET THE APPLICABLE STANDARDS REFERENCED IN TABLE 1701.1 OF
THE 2019 CPC AND IN CHAPTER 6 OF THE 2019 CGBSC).
8.ALL VENT THRU ROOF SHALL BE PLACED AT A MINIMUM OF THREE FEET VERTICALLY AND
TEN FEET HORIZONTALLY FROM FRESH AIR INTAKES, WINDOWS, DOORS OR OTHER
OPENINGS.
9.ALL SHUT OFF MECHANICAL/PLUMBING CONTROL SHUT OFF VALVES NEED TO BE
CONVENIENTLY LOCATED ABOVE THE CORRIDOR.
10.PROVIDE AND INSTALL ACCESS PANELS TO ALLOW ACCESS TO VALVES, EQUIPMENT, ETC.
LOCATED ABOVE INACCESSIBLE CEILINGS AND WALL CAVITIES. ALL WALL MOUNT ACCESS
PANELS SHALL BE STAINLESS STEEL DOORS AND ALL CEILINGS PAINTED.
• PANELS TO BE 12" X 12" OR AS REQUIRED.
11.ALL SANITARY LINES AND PLUMBING FIXTURES ON THE PROJECT SHALL HAVE AN
APPROVED MEANS OF SEWAGE BACKFLOW PREVENTION. FIXTURE SPECIFIC BACKFLOW
PREVENTION INCLUDING AIR GAPS AND VACUMM BREAKERS ARE AN ACCEPTABLE MEANS
OF BACKFLOW PREVENTION.
12.CLEANOUTS SHALL BE INSTALLED PER 2019 CALIFORNIA PLUMBING CODE SECTION 707,
719, AND 803.
13.INSTALL SANITARY PIPING 3" OR SMALLER AT A SLOPE OF 1/4" PER FOOT AND SANITARY
PIPING 4" AND LARGE AT A SLOPE OF 1/8" PER FOOT. SLOPE OF BUILDING SEWERS SHALL
NOT BE LESS THAN 2% UNLESS OTHERWISE NOTED.
14.FLOOR AND TRENCH DRAINS SHALL BE IN ACCORDANCE WITH ASME A112.6.3.
15.ALL FAUCETS IN PUBLIC RESTROOMS SHALL BE SELF-CLOSING OR SEL=CLOSING
METERING FAUCETS.
16.PUBLIC LAVATORIES SHALL HAVE CONTROLS TO LIMIT THE WATER TEMPERATURE TO 100
DEGREES FAHRENHEIT.
17.WATER PIPE AND FITTINGS WITH A LEAD CONTENT WHICH EXCEEDS 0.25% SHALL BE
PROHIBITED IN SYSTEMS CONVEYING POTABLE WATER.
18.ALL HOSE BIBBS,WALL HYDRANTS AND JANITORIAL SERVICE SINKS SHALL BE EQUIPPED
ITH AN APPROVED,PROPERLY INSTALLED ATMOSPHERIC TYPE VACUUM BREAKER.
19.ALL WATER CONNECTIONS TO HVAC EQUIPMENT SHALL BE PROTECTED BY AN APPROVED,
REDUCEDUCED PRESSURE BACKFLOW PREVENTION DEVICES. DEVICES SHALL BE
ACCESSIBLE FOR TEST AND MAINTENANCE. PROVIDE FUNNEL DRAIN AND INDIRECT
WASTE PIPING FOR BACKFLOW DEVICES AND DISTANT FROM FLOOR SINKS.
20.ALL AFFECTED POTABLE WATERPIPING SHALL BE DISINFECTED USING PROCEDURES
PRESCRIBED IN THE 2019 CALIFORNIA PLUMBING CODE SECTIONS 609.9(1) THROUGH
609.9(4). THE METHID TO BE FOLLOWED SHALL BE THAT PRESCRIBED BY THE OWNER OR IN
CASE NO METHOD IS PRESRIBED BY IT, THE FOLLOWING.
(1)THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE WATER UNTIL
POTABLE WATER APPEARS AT THE POINTS OF THE OUTLET.
(2)THE SYSTEM OR PARTS THEREOF SHALL BE FILLED WITH A WATER CHLORINE
SOLUTION CONTAINING NO LESS THAN 50 PARTS PER MILLION OF CHLORINE, AND
THE SYSTEM OR PART THEREOF SHALL BE VALVED-OFF AND ALLOWED TO STAND
FOR 24 HOURS; OR, THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A
WATER-CHLORINE SOLUTION CONTAINING NOT LESS THAN 200 PARTS PER MILLION
OF CHLORINE AND ALLOWED TO STAND FOR 3 HOURS.
(3)FOLLOWING THE ALLOWED STANDING TIME, THE SYSTEM SHALL BE FLUSHED WITH
CLEAN, POTABLE WATER UNTIL THE CHLORINE RESIDUAL IN THE FLUSHING WATER.
(4)THE PROCEDURE SHALL BE REPEATED WHERE IT IS SHOWN BY A
BACTERIOLOGICAL EXAMINATION MADE BY AN APPROVED AGENCY THAT
CONTAMINATION PERSISTS IN THE SYSTEM.
21.ALL DOMESTIC HOT WATER PIPING SHALL BE INSULATED AS REQUIRED BY CALIFORNIA
ENERGY COMMISSION TABLE 123-A OF THE BUILDING ENERGY EFFICIENCY STANDARDS,
INSULATION SHALL HAVE A FIRE HAZARD CLASSIFICATION 25/30 COMPOSITE RATING.
PIPE SIZE INSULATION THICKNESS INSULATION VALUE
<1"1" K FACTOR = 0.25
1 1/4"1 1/2" K FACTOR = 0.25
1 1/2"1 1/2" K FACTOR = 0.25
2">2" K FACTOR = 0.25
22.CIRCULATING HGOT WATER SYSTEMS SHALL BE EQUIPPED WITH A CONTROL CAPABLE OF
AUTOMATICALLY TURNING OFF THE CIRCULATING PUMPS WHEN HOT WATER IS NOT
REQUIRED (TIMECLOCK).
23.ALL SERVICE WATER HEATING EQUIPMENT TO BE IN COMPLIANCE WITH THE CALIFORNIA
ENERGY COMMSSION (CEC) REQUIREMENTS AND BE SO LABELED.
24.COORDINATE WITH ELECTRICAL TRADE PRIOR TO ORDERING EQUIPMENT FOR AVAILABLE
VOLTAGES AT EQUIPMENT LOCATIONS.
25.DO NOT USE METALLIC GAS LINES TO GROUND ELECTRICAL SYSTEM.
26.COORDINATE ALL SLAB PENETRATIONS WITH GENERAL CONTRACTOR PRIOR TO
CONSTRUCTION. MAINTAIN A MINIMUM OF 2" CLEARANCE FROM THE EDGE OF THE SLAB
OPENING TO ANY STRUCTURAL MEMBERS AND PIPES.
27.UNLESS SPECIFICALLY SHOWN ON THE STRUCTURAL PLANS, NO STRUCTURAL MEMBER
SHALL BE CUT, NEITHER DRILLED, NOR NOTCHED WITHOUT PRIOR WRITTEN
AUTHORIZATION FROM THE STRUCTURAL ENGINEER AND OWNER.
28.SLEEVE OR CORE-DRILL FLOOR SLABS, WALLS, ETC. AS REQUIRED FOR PIPING AND FIRE
STOP OPENING AROUND PIPE. VERIFY LOCATION OF STRUCTURAL BEAMS, JOISTS, ETC.
BEFORE DRILLING.
29.FOR LOCATION OF PIPING SLEEVES AND FLOOR OPENINGS THROUGH STRUCTURAL FLOOR
SLABS. REFER TO DETAILS INDICATED IN STRUCTURAL DRAWINGS.
30.DEFERRED SUBMITTAL ITEMS SHALL BE SUBMTTED TO THE OWNER WHO SHALL REVIEW
AND PROVIDE NOTATION INDICATING DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO
BE IN GENERAL CONFORMANCE WITH BUILDING DESIGN SUBMITTAL MATERIALS SHALL
INCLUDE PLANS, DETAILS, CALCULATIONS PREPARED AND SIGNED BY A STATED
REGISTERED ENGINEER.
A.SUPPORTS AND SEISMIC BRACING -DESIGN LOADS FOR THE ANCHORAGE TO BE
COMPUTED USING STATE OF CALIFORNIA STANDARDS AND REQUIREMENTS.
31.CONTRACTOR SHALL PATCH AND REPAIR ALL SURFACE AREAS DAMAGED BY
CONSTRUCTION OPERATION.
32.PROVIDE TEMPORARY COVERS, CAPS, OR PLUGS ON SANITARY SEWER SYSTEM
THROUGHOUT THE DURATION OF THE CONSTRICTION. RAG, WADS, DUCT TAPE, OR OTER
SIMILAR METHODS OF TEMPORARY COVERS SHALL NOT BE UTLIZED. UPON COMPLETIONG
OF CONSTRUCTION, COMPLETELY REMOVE ANY AND ALL OBSTRUCTIONS INSIDE THE
ENTIRE SYSTEM BY SNAKING, RODING, OR JETTING THE SYSTEM IMMEDIATELY PRIOR TO
PROJECT TURNOVER TO THE OWNER.
33.ALL VALVES, UNIONS, ETC. TO BE LINE SIZE UNLESS OTHERWISE INDICATED ON DRAWINGS.
34.UNIONS SHALL BE PROVIDED AND INSTALLED AFTER EACH THREADED TYPE VALVE AND
PRIOR TOP EQUIPMENT CONNECTIONS.
35.ALL INTERIOR CONDENSATE PIPING SHALL BE INSULATED W ITH CLOSED CELL FOAM
INSULATION; WITH FIRE HAZARD CLASSIFICATION 25/50 COMPOSITE RATING.
36.ANY DEVIATION FROM THE DRAWINGS OR SPECIFICATIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE OWNER PRIOR TO INSTALLATION.
37.THE ENTIRE AREA UNDER CONSTRUCTION SHALL BE PROVIDED WITH A COMPLETE FIRE
SPRINKLER SYSTEM IN ALL RESPECTS. RELOCATED/ADD NEW SPRINKLER DROPS TO
EXISTING SYSTEMS WHERE REQUIRED TO PROVIDE COMPLETE COVERAGE THROUGHOUT
THE AREA OF CONSTRUCTION. COORDINATE FIRE SPRINKLER PIPING AND HEAD
LOCATIONS WITH ALL TRADES PRIOR TO FABRICATION AND/OR INSTALLATION. IF
CONFLICTS OCCUR BETWEEN FIRE SPRINKLER PIPING/HEADS AND LIGHTS, DIFFUSRES,
DUCTWORK, ETC. THE FIRE SPRINKLER PIPINGHEADS SHALL BE RELOCATED OR
REROUTED AT NO ADDITIONAL EXPENSE TO THE PROJECT. AN ADEQUATE SUPPLY OF
EXTRA PIPING AND FITTINGS SHALL BE MAINTAINED ON SITE TO ALLOW FOR FIELD
MODIFICATIONS. PERFORM HYDRAULIC CALCULATIONS AS REQUIRED BY NFPA, LOCAL,
STATE CODES AND THE OWNER'S INSURANCE AGENCY. APPROVED SHOP DRAWINGS DO
NOT PRECLUDE REROUTING IF SO REQUIRED BY THE OWNER.
38.FOR PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSNTIALLY
DIAGRAMMTIC AND ALTHOUGH SIZES AND LOCATION OF EQUIPMENT IS DRAIN TO SCALE
WHEREVER POSSIBLE. THE CONTRACTOR SHALL MAKE USE OF ALLDATA IN ALL OF THE
CONTRACTOR DOCUMENTS AND VERIFY THIS INFORMATION BEFORE ORDERING,
FABRICATING OR INSTALLING ANY MATERIALS.
39.CONTRACTOR SHALL PROVIDE AS-BUILT CONDITIONS CAREFULLY AND NEATLY RECORDED
USING METHODS ACCEPTABLE TO THE OWNER. THEY SHALL BE KEPT UP TO DATE DURING
THE ENTIRE PROGRESS OF THE WORK MADE AVAILABLE TO THE OWNER AT ANY TIME.
FINAL DRAWINGS SHALL BE SUBMITTED IN PDF FORMAT, SHALL MATCH SIZE OF THE
ORIGINAL CONTRACT DRAWINGS, AND SHALL COMPLY WITH THE FOLLOWING.
a.OWNER DESIGN PROFESSIONALS NAME AND STAMP SHALL BE REMOVED FROM
EACH DRAWING.
b.ADD CONTRACTOR'S NAME AND CONTACT INFORMATION ON EACH DRAWING.
c.ADD"AS-BUILT" TO THE LOWER RIGHT AREA OF EACH DRAWING.
40.PROVIDE WRITTEN WARRANT TO REPLACE ALL FAULY MATERIALS AND/OR LABOR, AT NO
COST TOTHE OWNER, FOR A PERIOD OF ONE YEAR FROM DATE OF THE OWNER'S
ACCEPTANCE.
GENERAL NOTES
1. COVERED EXPOSED HOT AND COLD WATER PIPING AND WASTE PIPING AT ALL LAVATORIES
WITH NEATLY PRE-FORMED PIPE INSULATION, MCGUIRE OR APPROVED EQUIVALENT.
2. ALL PIPING UNDER LAVATORIES SHALL BE INSULATED OR OTHERWISE COVERED. THERE
SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORIES.
3. FAUCET CONTROLS AND OPERATING MECHANISMS SHALL BBE OPERABLE WITH ONE
HANDED AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE
WRIST.
4. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5 LBF.
LEVER OPERATED, PUSH TYPE, AND ELECTRONICALLY CONTROLLED MECHANISMS ARE
EXAMPLES OF ACCEPTABLE DESIGNS. SELF-CLOSING VALVES ARE ALLOWED IF THE
FAUCET REMAINS OPEN FOR AT LEAST 10 SECONDS.
5. ACCESSIBLE PLUMBING FIXTURES SHALL COMPLY WITH ALL OF THE REQUIREMENTS OF
THE 2019 CALIFORNIA BUILDING CODE CHAPTER 11B-DIVISION 6. HEIGHTS AND LOCATION
OF ALL FIXTURES SHALL BE ACCORDING TO THE 2019 CBC TABLE 11B-604.9. FIXTURE
CONTROLS SHALL COMPLY WITH CHAPTER SECTION 11B-309.4.
ADA COMPLIANCE NOTES
- A -
ABV ABOVE
A.P.ACESS PANEL
- B -
BEH.BEHIND
- C -
CLG CEILING
CO CLEANOUT
CONT.CONTINUATION
CW COLD WATER
- D -
DN DOWN
DWG DRAWING
- E -
(E)EXISTING
- F -
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FLR FLOOR
- H -
HB HOSE BIBB
HW HOT WATER
PLUMBING ABBREVIATIONS
- A -
ABV ABOVE
A.P.ACESS PANEL
- B -
BEH.BEHIND
- C -
CLG CEILING
CO CLEANOUT
CONT.CONTINUATION
CW COLD WATER
- D -
DN DOWN
DWG DRAWING
- E -
(E)EXISTING
- F -
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FLR FLOOR
- H -
HB HOSE BIBB
HW HOT WATER
PLUMBING SYMBOLS
PIPING RISE OR DROP
PIPING DOWN
PIPING UP
BRANCH CONNECTION
BRANCH BOTTOM CONNECTION
SANITARY SEWER BELOW GROUND
SANITARY SEWER ABOVE GROUND
SANITARY VENT
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING FIXTURE
TO BE REMOVED
FLOOR DRAIN
FLOOR CLEANOUT
CLEANOUT
SHUT OFF VALVE
DIRECTION OF FLOW
PLUGGED OUTLET
PIPING BREAK
EXISTING TO REMAIN
EXISTING TO BE REMOVED
POINT OF CONNECTION
POINT OF DISCONNECTION
DETAIL NUMBER
DETAIL DESIGNATION
DRAWING NUMBER
X
P-X
EQUIPMENT DESCRIPTION
EQUIPMENT DESIGNATION
EQUIPMENT NUMBER
PLUMBING SHEET INDEX
SHEET
NUMBER SHEET NAME
RESTROOM AND BREAK ROOM RENOVATION. UPDATED SANITARY, VENT AND
DOMESTIC WATER LAYOUT. NEW WATER METER WITHIN EXISTING WATER METER
VAULT.
SCOPE OF WORK
No. Description Date
1 90% CD 5/02/2024
2 PERMIT SET 5/17/2024
3 BACK CHECK SET 1/15/2025
4 BACK CHECK SET_V2 4/08/2025
NO.NAME
P0.1 GENERAL NOTES, ABBREIVIATIONS AND SYMBOLS
P0.2 PLUMBING SCHEDULES
P1.1 PLUMBING DOMESTIC WATER FLOOR PLAN
P1.2 PLUMBING SANITARY AND VENT FLOOR PLAN
P3.1 PLUMBING DETAILS
P4.1 PLUMBING TITLE-24
3
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
5/
1
6
/
2
0
2
4
3
:
3
0
:
1
7
P
M
P0.1
PLUMBING
GENERAL NOTES,
ABBREIVIATIONS
AND SYMBOLS23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
5/17/2024
Author
625 S. CYPRESS
GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE APPLICABLE CODES:
• 2022 CALIFORNIA PLUMBING CODE (CPC)
• 2022 CALIFORNIA BUILDING CODE
• 2022 CALIFORNIA MECHANICAL CODE
• 2022 CALIFORNIA ELECTRICAL CODE
• 2022 CALIFORNIA FIRE CODE
• CALIFORNIA STATE FIRE MARSHAL
• NFPA STANDARDS
• 2022 CALIFORNIA ENERGY CODE
• 2022 CALIFORNIA GREEN BUILDING STADARDS CODE (CGBSC)
• 2010 ADA STANDARS
• CALIFORNIA ADMINISTRATIVE CODES, TITLE 17 AND 24.
2.EXISTING CONDITIONS ARE BASED ON "AS-BUILT" DRAWINGS AND/OR LIMITED FIELD
VERIFICATIONS. THE CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT NO
ADDITIONAL EXPENSE TO THE PROJECT. NO ADDITIONAL COMPENSATION WILL BE
PROVIDED FOR ANY EXTRAS DUE TO THE CONTRACTO'S FAILURE TO VISIT THE PROJECT
SITE AND/OR PDETERMINATION OF EXISTING CONDITIONS PRIOR TO SUBMITTING THE BID.
ANY DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO THE OWNER FOR
RESOLUTION.
3.CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE INCIDENTAL DEMOLITION WORK
PRIOR TO BIDDING AND COMMENCEMENT OF WORK. THE CONTRACTOR IS RESPONSIBLE
FOR DEMOLITION OF ALL EXISTING EQUIPMENT AS REQUIRED FOR THE
INSTALLATION/CONSTRUCTION OF NEW WORK.
4.CONTRACTOR SHALL COORDIANTE WITH ALL OTHER TRADES FOR CLEARANCES AND
WORK INCLUDED PRIOR TO START OF WORK.
5.KEEP ALL PIPING CLEAR FROM LOAD BEARING FOOTINGS.
6.REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS, MOUNTING HEIGHTS, AND
COLORS OF ALL PLUMBING FIXTURES.
7.2019 CALIFORNIA GREEN BUILDING STADARDS CODE 5.303.6. PLUMBING FIXTURES AND
FITTINGS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2019 CALIFORNIA PLUMBING
CODE AND SHALL MEET THE APPLICABLE STANDARDS REFERENCED IN TABLE 1701.1 OF
THE 2019 CPC AND IN CHAPTER 6 OF THE 2019 CGBSC).
8.ALL VENT THRU ROOF SHALL BE PLACED AT A MINIMUM OF THREE FEET VERTICALLY AND
TEN FEET HORIZONTALLY FROM FRESH AIR INTAKES, WINDOWS, DOORS OR OTHER
OPENINGS.
9.ALL SHUT OFF MECHANICAL/PLUMBING CONTROL SHUT OFF VALVES NEED TO BE
CONVENIENTLY LOCATED ABOVE THE CORRIDOR.
10.PROVIDE AND INSTALL ACCESS PANELS TO ALLOW ACCESS TO VALVES, EQUIPMENT, ETC.
LOCATED ABOVE INACCESSIBLE CEILINGS AND WALL CAVITIES. ALL WALL MOUNT ACCESS
PANELS SHALL BE STAINLESS STEEL DOORS AND ALL CEILINGS PAINTED.
• PANELS TO BE 12" X 12" OR AS REQUIRED.
11.ALL SANITARY LINES AND PLUMBING FIXTURES ON THE PROJECT SHALL HAVE AN
APPROVED MEANS OF SEWAGE BACKFLOW PREVENTION. FIXTURE SPECIFIC BACKFLOW
PREVENTION INCLUDING AIR GAPS AND VACUMM BREAKERS ARE AN ACCEPTABLE MEANS
OF BACKFLOW PREVENTION.
12.CLEANOUTS SHALL BE INSTALLED PER 2019 CALIFORNIA PLUMBING CODE SECTION 707,
719, AND 803.
13.INSTALL SANITARY PIPING 3" OR SMALLER AT A SLOPE OF 1/4" PER FOOT AND SANITARY
PIPING 4" AND LARGE AT A SLOPE OF 1/8" PER FOOT. SLOPE OF BUILDING SEWERS SHALL
NOT BE LESS THAN 2% UNLESS OTHERWISE NOTED.
14.FLOOR AND TRENCH DRAINS SHALL BE IN ACCORDANCE WITH ASME A112.6.3.
15.ALL FAUCETS IN PUBLIC RESTROOMS SHALL BE SELF-CLOSING OR SEL=CLOSING
METERING FAUCETS.
16.PUBLIC LAVATORIES SHALL HAVE CONTROLS TO LIMIT THE WATER TEMPERATURE TO 100
DEGREES FAHRENHEIT.
17.WATER PIPE AND FITTINGS WITH A LEAD CONTENT WHICH EXCEEDS 0.25% SHALL BE
PROHIBITED IN SYSTEMS CONVEYING POTABLE WATER.
18.ALL HOSE BIBBS,WALL HYDRANTS AND JANITORIAL SERVICE SINKS SHALL BE EQUIPPED
ITH AN APPROVED,PROPERLY INSTALLED ATMOSPHERIC TYPE VACUUM BREAKER.
19.ALL WATER CONNECTIONS TO HVAC EQUIPMENT SHALL BE PROTECTED BY AN APPROVED,
REDUCEDUCED PRESSURE BACKFLOW PREVENTION DEVICES. DEVICES SHALL BE
ACCESSIBLE FOR TEST AND MAINTENANCE. PROVIDE FUNNEL DRAIN AND INDIRECT
WASTE PIPING FOR BACKFLOW DEVICES AND DISTANT FROM FLOOR SINKS.
20.ALL AFFECTED POTABLE WATERPIPING SHALL BE DISINFECTED USING PROCEDURES
PRESCRIBED IN THE 2019 CALIFORNIA PLUMBING CODE SECTIONS 609.9(1) THROUGH
609.9(4). THE METHID TO BE FOLLOWED SHALL BE THAT PRESCRIBED BY THE OWNER OR IN
CASE NO METHOD IS PRESRIBED BY IT, THE FOLLOWING.
(1)THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE WATER UNTIL
POTABLE WATER APPEARS AT THE POINTS OF THE OUTLET.
(2)THE SYSTEM OR PARTS THEREOF SHALL BE FILLED WITH A WATER CHLORINE
SOLUTION CONTAINING NO LESS THAN 50 PARTS PER MILLION OF CHLORINE, AND
THE SYSTEM OR PART THEREOF SHALL BE VALVED-OFF AND ALLOWED TO STAND
FOR 24 HOURS; OR, THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A
WATER-CHLORINE SOLUTION CONTAINING NOT LESS THAN 200 PARTS PER MILLION
OF CHLORINE AND ALLOWED TO STAND FOR 3 HOURS.
(3)FOLLOWING THE ALLOWED STANDING TIME, THE SYSTEM SHALL BE FLUSHED WITH
CLEAN, POTABLE WATER UNTIL THE CHLORINE RESIDUAL IN THE FLUSHING WATER.
(4)THE PROCEDURE SHALL BE REPEATED WHERE IT IS SHOWN BY A
BACTERIOLOGICAL EXAMINATION MADE BY AN APPROVED AGENCY THAT
CONTAMINATION PERSISTS IN THE SYSTEM.
21.ALL DOMESTIC HOT WATER PIPING SHALL BE INSULATED AS REQUIRED BY CALIFORNIA
ENERGY COMMISSION TABLE 123-A OF THE BUILDING ENERGY EFFICIENCY STANDARDS,
INSULATION SHALL HAVE A FIRE HAZARD CLASSIFICATION 25/30 COMPOSITE RATING.
PIPE SIZE INSULATION THICKNESS INSULATION VALUE
<1"1" K FACTOR = 0.25
1 1/4"1 1/2" K FACTOR = 0.25
1 1/2"1 1/2" K FACTOR = 0.25
2">2" K FACTOR = 0.25
22.CIRCULATING HGOT WATER SYSTEMS SHALL BE EQUIPPED WITH A CONTROL CAPABLE OF
AUTOMATICALLY TURNING OFF THE CIRCULATING PUMPS WHEN HOT WATER IS NOT
REQUIRED (TIMECLOCK).
23.ALL SERVICE WATER HEATING EQUIPMENT TO BE IN COMPLIANCE WITH THE CALIFORNIA
ENERGY COMMSSION (CEC) REQUIREMENTS AND BE SO LABELED.
24.COORDINATE WITH ELECTRICAL TRADE PRIOR TO ORDERING EQUIPMENT FOR AVAILABLE
VOLTAGES AT EQUIPMENT LOCATIONS.
25.DO NOT USE METALLIC GAS LINES TO GROUND ELECTRICAL SYSTEM.
26.COORDINATE ALL SLAB PENETRATIONS WITH GENERAL CONTRACTOR PRIOR TO
CONSTRUCTION. MAINTAIN A MINIMUM OF 2" CLEARANCE FROM THE EDGE OF THE SLAB
OPENING TO ANY STRUCTURAL MEMBERS AND PIPES.
27.UNLESS SPECIFICALLY SHOWN ON THE STRUCTURAL PLANS, NO STRUCTURAL MEMBER
SHALL BE CUT, NEITHER DRILLED, NOR NOTCHED WITHOUT PRIOR WRITTEN
AUTHORIZATION FROM THE STRUCTURAL ENGINEER AND OWNER.
28.SLEEVE OR CORE-DRILL FLOOR SLABS, WALLS, ETC. AS REQUIRED FOR PIPING AND FIRE
STOP OPENING AROUND PIPE. VERIFY LOCATION OF STRUCTURAL BEAMS, JOISTS, ETC.
BEFORE DRILLING.
29.FOR LOCATION OF PIPING SLEEVES AND FLOOR OPENINGS THROUGH STRUCTURAL FLOOR
SLABS. REFER TO DETAILS INDICATED IN STRUCTURAL DRAWINGS.
30.DEFERRED SUBMITTAL ITEMS SHALL BE SUBMTTED TO THE OWNER WHO SHALL REVIEW
AND PROVIDE NOTATION INDICATING DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO
BE IN GENERAL CONFORMANCE WITH BUILDING DESIGN SUBMITTAL MATERIALS SHALL
INCLUDE PLANS, DETAILS, CALCULATIONS PREPARED AND SIGNED BY A STATED
REGISTERED ENGINEER.
A.SUPPORTS AND SEISMIC BRACING -DESIGN LOADS FOR THE ANCHORAGE TO BE
COMPUTED USING STATE OF CALIFORNIA STANDARDS AND REQUIREMENTS.
31.CONTRACTOR SHALL PATCH AND REPAIR ALL SURFACE AREAS DAMAGED BY
CONSTRUCTION OPERATION.
32.PROVIDE TEMPORARY COVERS, CAPS, OR PLUGS ON SANITARY SEWER SYSTEM
THROUGHOUT THE DURATION OF THE CONSTRICTION. RAG, W ADS, DUCT TAPE, OR OTER
SIMILAR METHODS OF TEMPORARY COVERS SHALL NOT BE UTLIZED. UPON COMPLETIONG
OF CONSTRUCTION, COMPLETELY REMOVE ANY AND ALL OBSTRUCTIONS INSIDE THE
ENTIRE SYSTEM BY SNAKING, RODING, OR JETTING THE SYSTEM IMMEDIATELY PRIOR TO
PROJECT TURNOVER TO THE OWNER.
33.ALL VALVES, UNIONS, ETC. TO BE LINE SIZE UNLESS OTHERWISE INDICATED ON DRAWINGS.
34.UNIONS SHALL BE PROVIDED AND INSTALLED AFTER EACH THREADED TYPE VALVE AND
PRIOR TOP EQUIPMENT CONNECTIONS.
35.ALL INTERIOR CONDENSATE PIPING SHALL BE INSULATED W ITH CLOSED CELL FOAM
INSULATION; WITH FIRE HAZARD CLASSIFICATION 25/50 COMPOSITE RATING.
36.ANY DEVIATION FROM THE DRAWINGS OR SPECIFICATIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE OWNER PRIOR TO INSTALLATION.
37.THE ENTIRE AREA UNDER CONSTRUCTION SHALL BE PROVIDED WITH A COMPLETE FIRE
SPRINKLER SYSTEM IN ALL RESPECTS. RELOCATED/ADD NEW SPRINKLER DROPS TO
EXISTING SYSTEMS WHERE REQUIRED TO PROVIDE COMPLETE COVERAGE THROUGHOUT
THE AREA OF CONSTRUCTION. COORDINATE FIRE SPRINKLER PIPING AND HEAD
LOCATIONS WITH ALL TRADES PRIOR TO FABRICATION AND/OR INSTALLATION. IF
CONFLICTS OCCUR BETWEEN FIRE SPRINKLER PIPING/HEADS AND LIGHTS, DIFFUSRES,
DUCTWORK, ETC. THE FIRE SPRINKLER PIPINGHEADS SHALL BE RELOCATED OR
REROUTED AT NO ADDITIONAL EXPENSE TO THE PROJECT. AN ADEQUATE SUPPLY OF
EXTRA PIPING AND FITTINGS SHALL BE MAINTAINED ON SITE TO ALLOW FOR FIELD
MODIFICATIONS. PERFORM HYDRAULIC CALCULATIONS AS REQUIRED BY NFPA, LOCAL,
STATE CODES AND THE OWNER'S INSURANCE AGENCY. APPROVED SHOP DRAWINGS DO
NOT PRECLUDE REROUTING IF SO REQUIRED BY THE OWNER.
38.FOR PURPOSE OF CLEARNESS AND LEGIBILITY, THE DRAWINGS ARE ESSNTIALLY
DIAGRAMMTIC AND ALTHOUGH SIZES AND LOCATION OF EQUIPMENT IS DRAIN TO SCALE
WHEREVER POSSIBLE. THE CONTRACTOR SHALL MAKE USE OF ALLDATA IN ALL OF THE
CONTRACTOR DOCUMENTS AND VERIFY THIS INFORMATION BEFORE ORDERING,
FABRICATING OR INSTALLING ANY MATERIALS.
39.CONTRACTOR SHALL PROVIDE AS-BUILT CONDITIONS CAREFULLY AND NEATLY RECORDED
USING METHODS ACCEPTABLE TO THE OWNER. THEY SHALL BE KEPT UP TO DATE DURING
THE ENTIRE PROGRESS OF THE WORK MADE AVAILABLE TO THE OWNER AT ANY TIME.
FINAL DRAWINGS SHALL BE SUBMITTED IN PDF FORMAT, SHALL MATCH SIZE OF THE
ORIGINAL CONTRACT DRAWINGS, AND SHALL COMPLY WITH THE FOLLOWING.
a.OWNER DESIGN PROFESSIONALS NAME AND STAMP SHALL BE REMOVED FROM
EACH DRAWING.
b.ADD CONTRACTOR'S NAME AND CONTACT INFORMATION ON EACH DRAWING.
c.ADD"AS-BUILT" TO THE LOWER RIGHT AREA OF EACH DRAWING.
40.PROVIDE WRITTEN WARRANT TO REPLACE ALL FAULY MATERIALS AND/OR LABOR, AT NO
COST TOTHE OWNER, FOR A PERIOD OF ONE YEAR FROM DATE OF THE OWNER'S
ACCEPTANCE.
GENERAL NOTES
1. COVERED EXPOSED HOT AND COLD WATER PIPING AND WASTE PIPING AT ALL LAVATORIES
WITH NEATLY PRE-FORMED PIPE INSULATION, MCGUIRE OR APPROVED EQUIVALENT.
2. ALL PIPING UNDER LAVATORIES SHALL BE INSULATED OR OTHERWISE COVERED. THERE
SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORIES.
3. FAUCET CONTROLS AND OPERATING MECHANISMS SHALL BBE OPERABLE WITH ONE
HANDED AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE
WRIST.
4. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5 LBF.
LEVER OPERATED, PUSH TYPE, AND ELECTRONICALLY CONTROLLED MECHANISMS ARE
EXAMPLES OF ACCEPTABLE DESIGNS. SELF-CLOSING VALVES ARE ALLOWED IF THE
FAUCET REMAINS OPEN FOR AT LEAST 10 SECONDS.
5. ACCESSIBLE PLUMBING FIXTURES SHALL COMPLY WITH ALL OF THE REQUIREMENTS OF
THE 2019 CALIFORNIA BUILDING CODE CHAPTER 11B-DIVISION 6. HEIGHTS AND LOCATION
OF ALL FIXTURES SHALL BE ACCORDING TO THE 2019 CBC TABLE 11B-604.9. FIXTURE
CONTROLS SHALL COMPLY WITH CHAPTER SECTION 11B-309.4.
ADA COMPLIANCE NOTES
- A -
ABV ABOVE
A.P.ACESS PANEL
- B -
BEH.BEHIND
- C -
CLG CEILING
CO CLEANOUT
CONT.CONTINUATION
CW COLD WATER
- D -
DN DOWN
DWG DRAWING
- E -
(E)EXISTING
- F -
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FLR FLOOR
- H -
HB HOSE BIBB
HW HOT WATER
PLUMBING ABBREVIATIONS
- A -
ABV ABOVE
A.P.ACESS PANEL
- B -
BEH.BEHIND
- C -
CLG CEILING
CO CLEANOUT
CONT.CONTINUATION
CW COLD WATER
- D -
DN DOWN
DWG DRAWING
- E -
(E)EXISTING
- F -
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FLR FLOOR
- H -
HB HOSE BIBB
HW HOT WATER
PLUMBING SYMBOLS
PIPING RISE OR DROP
PIPING DOWN
PIPING UP
BRANCH CONNECTION
BRANCH BOTTOM CONNECTION
SANITARY SEWER BELOW GROUND
SANITARY SEWER ABOVE GROUND
SANITARY VENT
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING FIXTURE
TO BE REMOVED
FLOOR DRAIN
FLOOR CLEANOUT
CLEANOUT
SHUT OFF VALVE
DIRECTION OF FLOW
PLUGGED OUTLET
PIPING BREAK
EXISTING TO REMAIN
EXISTING TO BE REMOVED
POINT OF CONNECTION
POINT OF DISCONNECTION
DETAIL NUMBER
DETAIL DESIGNATION
DRAWING NUMBER
X
P-X
EQUIPMENT DESCRIPTION
EQUIPMENT DESIGNATION
EQUIPMENT NUMBER
PLUMBING SHEET INDEX
SHEET
NUMBER SHEET NAME
No. Description Date
1 90% CD 5/02/2024
2 PERMIT SET 5/17/2024
NO.NAME
P0.1 PLUMBING GENERAL NOTES, ABBREIVIATIONS AND SYMBOLS
P0.2 PLUMBING SCHEDULES
P1.1 PLUMBING DOMESTIC WATER FLOOR PLAN
P1.2 PLUMBING SANITARY AND VENT FLOOR PLAN
P3.1 PLUMBING DETAILS
MARK FIXTURE
ROUGH-IN-SIZE FIXTURE UNIT
DESCRIPTION/REMARKS
TRAP S/W V CW HW WASTE WATER
WC-1
WATER CLOSET
(FLUSH VALVE)
ACCESSIBLE INT 4" 2" 1 1/2" - 4 5
AMERICAN STANDARD "AFWALL MILLENIUM" #3351.101, 16 1/2"HT. WALL MOUNTED, TOP SPUD, VITREOUS
CHINA, ELONGATED BOWL, FLUSH VALVE TOILET. JAY R SMITH #0211Y SINGLE ADJUSTABLE HEAVY DUTY
WATER CLOSET CARRIER 750LB OR EQUAL. INSTALL IN COMPLIANCE WITH ADA REQUIREMENTS.
AMTC #HSM-801-CT-11 1.1 GPF, TOUCHLESS, SENSOR OPERATED DIAPHRAGM VALVE, MANUAL OVERRIDE
BUTTON, HIGH BACK PRESSURE VACUUM BREAKER, FOUR (4) "C" ALKALINE BATTERIES. FLUSHOMETER
TO BE MINIMUM 1.5" BELOW ADA GRAB BAR.
AMERICAN STANDARD #5901.100SS OPEN FRONT LESS COVER, SELF SUSTAINING, HEAVY DUTY TOILET
SEAT.
WC-2
WATER CLOSET
(FLUSH VALVE)
BACK TO BACK
ACCESSIBLE
INT 4" 2" 1 1/2" - 4 5
AMERICAN STANDARD "AFWALL MILLENIUM" #3351.101, BACK TO BACK 16-1/2" HEIGHT AND STANDARD
HEIGHT. WALL MOUNTED, TOP SPUD, VITREOUS CHINA, ELONGATED BOWL, FLUSH VALVE TOILET. JAY R
SMITH #0221Y DOUBLE ADJUSTABLE HEAVY DUTY WATER CLOSET CARRIER 750LB OR EQUAL. INSTALL IN
COMPLIANCE WITH ADA REQUIREMENTS.
AMTC #HSM-801-CT-11 1.1 GPF, TOUCHLESS, SENSOR OPERATED DIAPHRAGM VALVE, MANUAL OVERRIDE
BUTTON, HIGH BACK PRESSURE VACUUM BREAKER, FOUR (4) "C" ALKALINE BATTERIES. FLUSHOMETER
TO BE MINIMUM 1.5" BELOW ADA GRAB BAR.
AMERICAN STANDARD #5901.100SS OPEN FRONT LESS COVER, SELF SUSTAINING, HEAVY DUTY TOILET
SEAT.
PPP #FVP-1VB FLUSH VALVE TAILPIECE TRAP PRIMER WITH VACUUM BREAKER, AS REQUIRED PER PLAN.
REFER TO DETAIL 4/P3.0.
WC-3
WATER CLOSET
(FLUSH VALVE)
BACK TO BACK
WITH
ACCESSIBLE
URINAL
INT 4" 2" 1 1/2" - 4 5
AMERICAN STANDARD "AFWALL MILLENIUM" #3351.101, STANDARD HEIGHT WALL MOUNTED, TOP SPUD,
VITREOUS CHINA, ELONGATED BOWL, FLUSH VALVE TOILET. JAY R SMITH #0209Y SINGLE ADJUSTABLE
HEAVY DUTY WATER CLOSET CARRIER WITH 2" AUXILIARY NO-HUB URINAL (UR-3).
AMTC #HSM-801-CT-11 1.1 GPF, TOUCHLESS, SENSOR OPERATED DIAPHRAGM VALVE, MANUAL OVERRIDE
BUTTON, HIGH BACK PRESSURE VACUUM BREAKER, FOUR (4) "C" ALKALINE BATTERIES.
AMERICAN STANDARD #5901.100SS OPEN FRONT LESS COVER, SELF SUSTAINING, HEAVY DUTY TOILET
SEAT.
WC-4 WATER CLOSET
(FLUSH TANK)INT 4" 2" 1 1/2" - 4 5
AMERICAN STANDARD "AFWALL MILLENIUM" #3351.101, STANDARD HEIGHT WALL MOUNTED, TOP SPUD,
VITREOUS CHINA, ELONGATED BOWL, FLUSH VALVE TOILET. JAY R SMITH #0211Y SINGLE ADJUSTABLE
HEAVY DUTY WATER CLOSET CARRIER 750LB OR EQUAL.
AMTC #HSM-801-CT-11 1.1 GPF, TOUCHLESS, SENSOR OPERATED DIAPHRAGM VALVE, MANUAL OVERRIDE
BUTTON, HIGH BACK PRESSURE VACUUM BREAKER, FOUR (4) "C" ALKALINE BATTERIES.
AMERICAN STANDARD #5901.100SS OPEN FRONT LESS COVER, SELF SUSTAINING, HEAVY DUTY TOILET
SEAT.
UR-1 URINAL
(ACCESIBLE)2" 2" 2" 1-1/2" - 2 4
AMERICAN STANDARD "WASHBROOK" #6590.001, WASHDOWN, TOP SPUD, VITREOUS CHINA, WALL
MOUNTED, COLOR:WHITE
AMTC #HSM-801FG-CU-18 0.125 GPF, TOUCHLESS, SENSOR OPERATED VALVE, MANUAL OVERRIDE
BUTTON, HIGH BACK PRESSURE VACUUM BREAKER, FOUR (4) "C" ALKALINE BATTERIES. PROGRAMMABLE
SETTINGS ON TIMER MODE ALLOW FLUSHING ONCE EVERY 30 MINUTES, 1, 2, OR 3 HOURS.
JAY R. SMITH FIXTURE CARRIER SUPPORT. INSTALL IN COMPLIANCE WITH ADA REQUIREMENTS. CONNECT
WITH WC-3.
LV-1
LAVATORY
(UNDERMOUNT)
ACCESSIBLE
1 1/2" 2" 2" 1/2" 1/2" 1 1
AMERICAN STANDARD "STUDIO" #0614.000, 21-1/4" X 15-1/4" X 8-1/4" DEEP, UNDERMOUNT LAVATORY
VIRTREOUS CHINA COLOR: WHITE. MCGUIRE CHROME PLATED 17 GA. CAST BRASS LA PATTERN P-TRAP,
SLIP JOINT NUTS AND CHROME PLATED BRASS SECURED ESCUTCHEON AND CLEANOUT PLUG.
SLOAN "OPTIMA" #EAF-300-HLT-CP-0.35GPM-MLM-IR-IQ-FCT-LT ELECTRONIC SENSOR FAUCET, HARDWIRED
LESS TRANSFORMER POWER SUPPLY, POLISHED CHROME FINISH, 0.35 GPM MULT-LAMINAR SPRAY. PROVIDE
WITH SLOAN #EAF-11 6 VDC PLUG-IN ADAPTOR, CHICAGO FAUCET 1005-ABCP STOPS AND SUPPLIES.
SLOAN SOAP DISPENSER #ESD-2000-SF, 6VDC PLUG-IN ADAPTOR #ESD-324 (PN 0346090) SOAP DISPENSER
ADAPTOR PLUG-IN CONNECTS TO MAX TWO (2) SOAP DISPENSERS.
MCGUIRE PRE-MOLDED PVC COVERING HW & CW SUPPLIES & P-TRAP SHALL BE WRAPPED FOR HANDICAP
PROTECTION. GROHE MOUNTING KIT. INSTALL IN COMPLIANCE WITH ADA REQUIREMENTS.
LV-2
LAVATORY
(WALL MOUNT)
ACCESSIBLE
1 1/2" 2" 2" 1/2" 1/2" 1 1
AMERICAN STANDARD "DECORUM" #9024.904EC, 20" X 18-1/4" X 5" DEEP, WALL HUNG LAVATORY. THREE
HOLE 4" CENTERS, LESS OVERFLOW, VIRTREOUS CHINA COLOR: WHITE. MCGUIRE CHROME PLATED 17
GA. CAST BRASS LA PATTERN P-TRAP, SLIP JOINT NUTS AND CHROME PLATED BRASS SECURED
ESCUTCHEON AND CLEANOUT PLUG.
AMERICAN STANDARD "MONTERREY" #5500.140-V035, 0.35 GPM PCA VANDAL RESISTANT NON-AERATED
SPRAY, CONVENTIONAL SPOUT, 4" CENTERSET, CAST BRASS, POLISHED CHROME FINISH, CHICAGO FAUCET
1005-ABCP STOPS AND SUPPLIES.
MANUAL SOAP DISPENSER, SEE ARCHITECTURAL DRAWINGS.
MCGUIRE PRE-MOLDED PVC COVERING HW & CW SUPPLIES & P-TRAP SHALL BE WRAPPED FOR HANDICAP
PROTECTION. GROHE MOUNTING KIT. INSTALL IN COMPLIANCE WITH ADA REQUIREMENTS.
KS-1 BREAK ROOM
SINK 2" 2" 1-1/2" 1/2" 1/2" 2 2
ELKAY #ELUHAD211545 18-1/4" X 23-1/2" X 4-3/8" DEEP SINGLE COMPARTMENT UNDERMOUNTSINK ADA SINK, 18
GAUGE TYPE 300 STAINLESS STEEL. MCGUIRE CHROME PLATED 17 GA. CAST BRASS P-TRAP, SLIP JOINT NUTS
AND CHROME PLATED BRASS SECURED ESCUTCHEON AND CLEANOUT PLUG.
HANSGROHE "ZESIS" #74810001, SINGLE HOLE, DECK MOUNTED, 1.5 GPM AERATED SPRAY, NEEDLE SPRAY,
SWIVEL RANGE 150°, SINGLE LEVEL, FINISH: CHROME, ADA COMPLIANT.
IN-SINK-ERATOR PRO 750 EVOLUTION SERIES. 120V, 15 AMPS, 60Hz, 3/4 HP. WITH WALL SWITCH.
EWC-1 DRINKING
FOUNTAIN 1-1/2" 2" 2" 1/2" - 1 1
ELKAY #LZWS-LRPBM28K WALL MOUNTED BI-LEVEL DRINKING FOUNTAIN WITH BOTTLE FILLING STATION,
FILTERED #51300C, 8.0 GPH REFRIGERATED. POWER 115V/60HZ.. #MFWS210 IN WALL CARRIER. INSTALL IN
COMPLIANCE WITH ADA REQUIREMENTS.
MS-1 MOP SINK 3" 3" 2" 1/2" 1/2" 3 3
ADVANCE TABCO #9-OP-20 FLOOR MOUNTED MOP SINK, 16 GAUGE TYPE "304" STAINLESS STEEL. 21" X 25"
X 10". #K-16 FREE FLOW DRAIN
AMERICAN STANDARD #8350.243 EXPOSED YOKE WALL MOUNT UTILITY FAUCET, 3" CAST BRASS SPOUT
WITH VACUUM BREAKER, INTEGRAL STOPS, 8" CENTERS, LEVER HANDLES, BUCKET HOOK, 3/4" THREADED
HOSE END.
WB-1 WATER BOX - - - 3/4" - - 1 OATEY "MODA" LAVATORY SUPPLY BOX WITH WATER HAMMER ARRESTOR. TWO (2) SUPPLY VALVES,
STAINLESS STEEL FLEX LINE TO WATER DISPENSER AND ICE MAKER.
HB-1 HOSE BIBB - - - 3/4" - - 2.5 ACORN #8151 STAINLESS STEEL RECESSED HOSE BOX, 3/4" MALE HOSE THREAD, VACUUM BREAKER,
REMOVABLE WHEEL LOOSE KEY HANDLE, LOCK SHIELD SCREW DRIVER STOP.
FD-1 FLOOR DRAIN 2" 2" 2" 1/2" TP - - -JAY R SMITH #2005YB-B-P050 CAST IRON FLOOR DRAIN WITH ANCHOR FLANGE, WEEPHOLES, HEAVY DUTY
WITH POLISHED STAINLESS STEEL STRAINER WITH TRAP PRIMER CONNECTION.
TMV-1 THERMOSTATIC
MIXING VALVE - - - 1/2" 1/2" - -APOLLO VALVE 34DLF-402-B17 #MVDBR-LF. SET TEMPERATURE TO 100 DEG. F. ASSE 1070 COMPLIANT.
MOUNT BELOW FIXTURE.
FCO-1 FLOOR
CLEANOUT -SEE
PLANS - - - - -JAY R SMITH #4040-U SERIES SQUARE TOP FLOOR CLEANOUT WITH VANDAL PROOF TOP.
WCO-1 WALL CLEANOUT -SEE
PLANS - - - - -JAY R SMITH #4420 SERIES CLEANOUT WITH FACE OF WALL COVER.
WHA-1 HAMMER
ARRESTOR - - - - - - -JAY R SMITH #5200 SERIES HYDROTROL JUNIIOR PISTON TYPE WATER HAMMER ARRESTOR. INSTALL PER
MANUFACTURERS RECOMMENDATION
CALGREEN TABLE A5.303.2.3.1
FIXTURE TYPE BASELINE FLOW RATE
SHOWERS HEADS 1.8 GPM @ 60 PSI
LAVATORY FAUCETS NON RESIDENTIAL 0.35 GPM @ 60 PSI
KITCHEN FAUCETS 1.8 GPM @ 60 PSI
WASH FOUNTAINS 1.8 GALLONS / CYCLE / 20 [RIM SPACE (IN) @ 60 PSI]
METERING FOUNTAINS 0.20 GALLONS / CYCLE
METERING FOUNTAINS FOR WASH FOUNTAINS 0.20 GALLONS / CYCLE / 20 [RIM SPACE (IN) @ 60 PSI]
GRAVITY TANK TYPE WATER CLOSETS 1.28 GALLONS / FLUSH
FLUSHOMETER TANK WATER CLOSETS 1.28 GALLONS / FLUSH
FLUSHOMETER VALVE WATER CLOSETS 1.28 GALLONS / FLUSH
ELECTROMECHANICAL HYDRAULIC WATER CLOSETS 1.28 GALLONS / FLUSH
URINALS 0.125 GALLONS / FLUSH
1. INCLUDES WATER CLOSETS WITH AN EFFECTIVE FLUSH RATE OF 1.12 GALS OR LESS WHEN TESTED PER ASME A 112.19.2 AND
ASME A 112.19.14 2. SEE CALGREEN TABLE A5.503.2.2 FOR ADDITIONAL NOTES AND REFERENCES. 3. WHERE COMPLYING FAUCETS
ARE UNAVAILABLE, AERATORS RATED AT 0.35 GPM OR OTHER MEANS MAY BE USED TO ACHIEVE REDUCTION. 4. WALL MOUNTED
URINALS @ 0.125 GPF.
SYMBOL LOCATION MANUFACTURER MODEL
STORAGE
CAPACITY
(GALLON)
THERMAL
EFFICIENCY
WATER SUPPLY
RECOVERY
AT 60°F RISE
HEATING ELEMENTS ELECTRICAL DATA DIMENSIONS
OPER.
WEIGHT (LBS)REMARKS
INLET
TEMP.
OUTLET
TEMP.KW
NUMBER
OF
ELEMENTS
ELEMENTAL
WATTAGE FLA V PHASE HZ DIA. HEIGHT
ABOVE MOP
SINK RHEEM EGSP30 30 98% 64°F - 20 GPH 3 1 3000 - 208 1 60 22-1/4" 32" 400
PROVIDE HOLDRITE
#30-SWHP-WM WALL MOUNTED
PLATFORM WITH SEISMIC
RESTRAINTS.
SYMBOL MANUFACTURER SERVICE LOCATION
TOTAL
SYSTEM
VOLUME
(GAL)
EXPANSION
FACTOR
PRESSURE
FACTOR
VOLUME DATA / GALLONS
(MINIMUM)MAX. ACCEPT.
FACTOR
DIMENSION (IN)PRESSURE
RATING
SYSTEM
CONNECTION
SIZE
LBS REMARKS
DESIGN TOTAL DIA. HEIGHT.
AMTROL
THERM-X-TROL
ST-5C
HOT WATER
SYSTEM FIRST FLOOR 35 .0150 1.8 0.95 - .09 10" 10" 150 PSIG 3/4" NPTM 60
ASME 125 PSIG RATED, FACTORY
PRE-CHARGE. CONTRACTOR TO
PROVIDE SUPPORT AND BRACKET.
PLUMBING FIXTURE SCHEDULE
WATER REDUCTION FIXTURE FLOW RATE
ELECTRIC TANK TYPE WATER HEATER SCHEDULE
EXPANSION TANK SCHEDULE
1
ET
1SCALE: NO TO SCALEELECTRIC WATER HEATER DETAIL
EWH
1
ET
1
PIPE MATERIAL SCHEDULE
SERVICE LOCATION MATERIALS
HARD DRAWN COPPER TYPE "L" ASTM B88. PERMANENTLY COLOR MARKED
WITH MANUFACTURER'S TRADEMARK AND COUNTRY OF ORIGIN. TYPE "L" SHALL
BE MARKED IN BLUE. COPPER PRESSURE SEAL JOINT FITTINGS, EPDM O-RINGS
AND PIPE STOPS. MINIMUM 200 PSIG WORKING PRESSURE RATING AT 250 DEG. F.
DOMESTIC
WATER
SOLID WALL PVC SCH. 40 ASTM D2665 DWV WITH PVC SOCKET FITTINGS. ASTM
D2665 IN ACCORDANCE WITH ASTM D3311 DWV PATTERNS TO FIT SCH. 40 PIPE.
ADHESIVE PRIMER ASTM F656
SOLVENT CEMENT ASTM D2564
SANITARY
WASTE
AND VENT
ABOVE GRADE
AND
BELOW GRADE
ABOVE GRADE
HARD DRAWN COPPER TYPE "L" ASTM B88. PERMANENTLY COLOR MARKED
WITH MANUFACTURER'S TRADEMARK AND COUNTRY OF ORIGIN. TYPE "L"
SHALL BE MARKED IN BLUE. COPPER PRESSURE SEAL JOINT FITTINGS, EPDM
O-RINGS AND PIPE STOPS. MINIMUM 200 PSIG WORKING PRESSURE RATING AT
250 DEG. F. WITH INSULATION
CONDENSATE ABOVE GRADE
INSTALLATION NOTES:
2.
1.
INSTALL PAN IN COMPLIANCE WITH CPC
(ONLY IF WATER HEATER IS INSTALLED
ABOVE THE CEILING).
EWH
1
HWS
CW
T/P RELIEF DISCHARGE TO
MOP SINK
3/4" DRAIN TO INDIRECTLY
DISCHARGE TO
LANDSCAPE
WALL MOUNTED
EQUIPMENT PLATFORM
HOLDRITE #30-SWHP-WM
ANCHORED TO WALL (150
LBS).
PROVIDE UPPER AND
LOWER SEIMIC RESTRAINTS
ON WATER HEATER.
PROVIDE 1/2" DIA. X 3"
LONG LAG SCREWS (TYP.
4 PLACES) MIN. 2 1/2"
EMBED.
UNION (TYP.)
S.O.V. (TYP.)
HOLDRITE #QS-U QUICK
STRAP EXPANSION
MOUNTING BRACKET.
INSTALL UPPER RESTRAINT 1/3 DOWN
FROM TOP OF WATER HEATER.
NOTES:
1. ABS AND PVC PIPING EXPOSED TO SUNLIGHT SHALL BE PROTECTED BY WATER-BASED SYNTHETIC LATEX
PAINTS.
2. FOR APPLICATIONS LISTED IN SECTION 2022 CPC 1.11.0 REGULATED BY THE OFFICE OF THE STATE FIRE
MARSHAL, PLASTIC PIPING SHALL NOT BE EXPOSED AS A PORTION OF THE INTERIOR ROOM FINISH IN A
BUILDING OR STRUCTURE. IF THE PIPING HAS A FLAME=SPREAD RATING EXCEEDING 75 WHEN TESTED IN
ACCORDANCE WITH ASTM E84-77a, "TEST FOR SURFACE BURNING CHARACTERISTICS OF BUILDING
MATERIALS." 2022 CPC 310.11.
3. SUSPENDED PIPING SHALL BE SUPPERTED AT INTERVALS NOT TO EXCEED THOSE SHOWN IN TABLE 313.3,
2022 CPC SEC. 313.3.
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
4
2
:
4
1
A
M
P0.2
PLUMBING
SCHEDULES
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 90% CD 5/02/2024
2 PERMIT SET 5/17/2024
3 BACK CHECK SET 1/15/2025
4 BACK CHECK SET_V2 4/08/2025
3
1
2
3
A B C D E F
WC-2
TP-1 WC-2
TP-1
WC-3
WC-4
UR-1
LV-1
TMV-1
LV-1
TMV-1
EWC-1
WC-1
LV-2
TMV-1
KS-1
MS-1
EWH-1
ET-1
2"CW DOWN
WITH A.P.
2"CW WITH
SHUT-OFF VALVE
NEW WATER METER
1/2"TP LINE
1/2"TP LINE
FDFD
HB-1
2"ø CW
2"
ø
C
W
1"ø CW
3/4"ø CW
2"CW HEADER
1/
2
"
ø
C
W
1/
2
"
ø
H
W
3/4"ø HW
1"
ø
C
W
3/4"HW DOWN
TO WATER
HEATER
1/
2
"
ø
C
W
1/2"ø HW
1"ø CW
2"
ø
C
W
2"ø CW
2"ø CW
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
4
2
:
4
3
A
M
P1.1
PLUMBING
DOMESTIC WATER
FLOOR PLAN
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 90% CD 5/02/2024
2 PERMIT SET 5/17/2024
3 BACK CHECK SET 1/15/2025
4 BACK CHECK SET_V2 4/08/2025
1
2
3
A B C D E F
WC-2
WC-3
WC-4
UR-1
WCO
LV-1
LV-1
EWC-1
WC-1
LV-2
KS-1
WCO
MS-1
WCO
4"VTR
2"FD-1 2"FD-1
WC-2
GCO
WCO
WCO
SEE CIVIL FOR
CONTINUATION
3"
ø
W
3"
ø
W
2"ø W
2"ø W4"ø W4"ø W
2"ø W 2"ø W
4"
ø
W
2"
ø
W
4"ø W4"ø W 2"
ø
V
2"ø V 2"ø V 2"ø V
2"
ø
V
2"
ø
V
2"
ø
V
2"V HEADER
FAN COIL
SEE SHEET M2.0
1"ø CD 1"ø CD 1"ø CD
1"
ø
C
D
3/4"ø CD
3/4"ø CD
FAN COIL
SEE SHEET M2.0
FAN COIL
SEE SHEET M2.0
FAN COIL
SEE SHEET M2.0
FAN COIL
SEE SHEET M2.0
CO
CO
1"
ø
C
D
1"CD TO INDIRECTLY
DISCHARGE TO MOP
SINK
3/4"CD TO INDIRECTLY
DISCHARGE TO
LAVATORY TAILPIECE
3/4"CD TO INDIRECTLY
DISCHARGE TO
LAVATORY TAILPIECE
CONDENSOR
SEE SHEET M2.0
CONDENSOR
SEE SHEET M2.0 3
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
4
2
:
4
4
A
M
P1.2
PLUMBING
SANITARY AND
VENT FLOOR PLAN
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 90% CD 5/02/2024
2 PERMIT SET 5/17/2024
3 BACK CHECK SET 1/15/2025
WATER HAMMER ARRESTOR
SCHEDULE FIXTURE UNIT TABULATION
PIPE SIZE IN
INCHES
MAXIMUM SPAN BETWEEN
SUPPORT HANGERS O.C.HANGER ROD
DIAMETER SIZE
MAX. LENGTH
FOR RODS
LONGITUDINAL
ANGLE BRACE
VERTICAL
HANGER ANGLE
(STIFFNER)
TRANSVERSE
ANGLE BRACE BOLT SIZE
HORIZONTAL VERTICAL
COPPER TUBE AND PIPE
1/2" AND 3/4"6'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18
GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18
GA. AT 40'-0" O.C.3/8"
1' THRU 1-1/2"6'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18
GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18
GA. AT 40'-0" O.C.3/8"
2"10'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18
GA. AT 80'-0" O.C.1 X 1 X 18 GA.2-1/2 X 2-1/2 X 16
GA. AT 40'-0" O.C.3/8"
STEEL PIPE FOR GAS
1/2" AND 3/4"6'-0" 6'-0" 3/8" 37"1-1/2 X 1-1/2 X 18
GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18
GA. AT 40'-0" O.C.3/8"
1' THRU 1-1/2"8'-0" 8'-0" 3/8" 37"1-1/2 X 1-1/2 X 18
GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18
GA. AT 40'-0" O.C.3/8"
2"10'-0" 10'-0" 3/8" 37"2-1/2 X 2-1/2 X 16
GA. AT 80'-0" O.C.1 X 1 X 18 GA.2-1/2 X 2-1/2 X 16
GA. AT 40'-0" O.C.3/8"
SCHEDULE 40 PVC AND ABS DWV
1/2" AND 3/4"4'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18
GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18
GA. AT 40'-0" O.C.3/8"
1' THRU 2"4'-0" 10'-0" 3/8" 37"1-1/2 X 1-1/2 X 18
GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18
GA. AT 40'-0" O.C.3/8"
CAST IRON HUBLESS (NO-HUB)
1-1/2" AND 2"15'-0" 3/8" 37"1-1/2 X 1-1/2 X 18
GA. AT 80'-0" O.C.1 X 1 X 18 GA.1-1/2 X 1-1/2 X 18
GA. AT 40'-0" O.C.3/8"
3" THRU 6"REFER TO SMACNA GUIDELINES IN SCHEDULE BELOW
SUPPORT EVERY JOINT, SUPPORT SHALL BE WITHIN 18 INCHES OF JOINT ON BOTH SIDES. (SUPPORT ALSO REQUIRED AT EACH HORIZONTAL JOINT
CONNECTION.)
ALL PIPING 2-1/2" AND LARGER PER THE FOLLOWING SMACNA GUIDELINES
2-1/2"10'-0" 10'-0" 1/2" 25"2-1/2 X 2-1/2 X 16
GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16
GA. AT 40'-0" O.C.3/8"
3"10'-0" 10'-0" 1/2" 25"2-1/2 X 2-1/2 X 16
GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16
GA. AT 40'-0" O.C.3/8"
4"10'-0" 10'-0" 5/8" 31"2-1/2 X 2-1/2 X 16
GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16
GA. AT 40'-0" O.C.1/2"
5"10'-0" 10'-0" 5/8" 31"2-1/2 X 2-1/2 X 16
GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16
GA. AT 40'-0" O.C.1/2"
6"10'-0" 10'-0" 5/8" 37"2-1/2 X 2-1/2 X 16
GA. @ 80'-0" O.C.2 X 2 X 16 GA.2-1/2 X 2-1/2 X 16
GA. AT 40'-0" O.C.1/2"
NOTES:
1. VERTICAL ANGLE ONLY REQUIRED WHEN ROD MAXIMUM LENGTH IS EXCEEDED. STIFFENER SHALL BE FULL LENGTH OF ROD LESS 2" ON EACH SIDE.
2. BRACING MAY BE OMITTED WHERE TOP OF PIPE IS 12" OR LESS FROM BOTTOM OF HANGER SUPPORT CONNECTED TO STRUCTURE.
3. ALLOW FOR EXPANSION EVERY 30'-0".
4. PROVIDE UPPER ATTACHMENT AS REQUIRED FOR CASES NOT SHOWN HERE. DO NOT INSTALL HANGER INSIDE INSULATION OR OTHERWISE PENETRATE VAPOR BARRIER.
DO NOT HANG ONE PIPE FROM ANOTHER. TRAPEZE HANGERS MAY BE USED FOR MULTIPLE PARALLEL PIPES.
HANGER SPACING FOR PIPE SIZE:
COPPER: 4"=12', 3"=11', 2-1/2"=10', 2"=9'. 1-1/2"=8', 1-1/4"=7', 1"=6', 3/4"=6', 1/2"=5'.
CAST IRON: 10' AND ONE NEAR ALL JOINTS.
STEEL: 4"=14', 3"=12', 2-1/2"=11', 2"=10', 1-1/2"=9', 1"=7', 3/4"=6', 1/2"=5'.
LOCATE HANGERS AS CLOSE AS POSSIBLE TO TURNS AND TEES OF PIPE. PROVIDE SUPPLEMENTARY STEEL STRUTS BETW EEN JOISTS IF REQUIRED. LOCATE HANGERS TO
TAKE LOAD OFF EQUIPMENT CONNECTIONS. ANCHOR WATER PIPE AGAINST SWAYING DUE TO CHANGES IN WATER VELOCITY. PROVIDE SEISMIC BRACING AS REQUIRED.
CHAIN OR PERFORATED STRAP IRON OR STEEL IS NOT ACCEPTABLE.
PDI
SIZE
PIPE
SIZE
FIXTURE
UNIT
LOAD
A 1/2" 1-11
B 3/4" 12-32
C 1" 33-60
D 1 1/4" 61-113
E 1 1/2" 114-154
F 2" 155-330
FIXTURE COLD HOT
WATER CLOSET - VALVE 8 -
WATER CLOSET - TANK 5 -
URINAL - VALVE 4 -
LAVATORY / SINK 1.5 1.5
SERVICE SINK 3 3
COMB. FIXTURE 3 3
FOR EQUIPMENT AND FIXTURES NOT LISTED
ABOVE, SIZE IN ACCORDANCE WITH LOAD
VALUES (WSFU) ASSIGN THE SAME.
IN COMPLIANCE WITH PDI WH201-06
PIPE 2-1/2" O.D. AND LARGER
PIPE 2" O.D. AND SMALLER
INDIRECT DRAIN TO FLOOR SINK DETAIL
VENT THROUGH ROOF DETAIL
WALL CLEANOUT DETAILS
FLUSH VALVE TRAP PRIMER
MULTIPLE FIXTURESSINGLE FIXTURES
FOR CONNECTION
TO STRUCTURE
SEE STRUCTURAL
DRAWINGS
LONGITUDINAL
DIAGONAL ANGLE
(SLOPE 1 TO 1). FOR
SIZE AND SPACING. SEE
SCHEDULE ALT. SIDES
EACH BRACE.
ATTACH BOLT.
SEE SCHEDULE
FOR SIZE
"B-LINE" B327
SHORT ANGLE
OR EQUAL
INSULATION PER
CEC TABLE 123-A
TYPICAL PIPE. SEE
PLAN FOR SIZE
AND LOCATION
HANGER ROD.
ADD VERTICAL ANGLE
STIFFENER IF LENGTH IS
GREATER THAN MAX.
LENGTH SHOWN ON PIPE
SUPPORT SCHEDULE
TRANSVERSE ANGLE BRACE.
ALTERNATE SIDES EVERY
BRACE
PIPE SLEEVE WITH I.D. 1/4"
LARGER THAN O.D OF BOLT
"B-LINE" B3100 CLEVIS
HANGER OR EQUAL.
SEE SCHEDULE FOR SPACING
"BLINE" B3162 OR EQUAL
PIPE SADDLE
FOR CONNECTION
TO STRUCTURE
SEE STRUCTURAL
DRAWINGS
THREADED HANGER ROD.
ADD VERTICAL ANGLE
STIFFENER IF LENGTH IS
GREATER THAN MAX. LENGTH
SHOWN ON PIPE SUPPORT
SCHEDULE.
NUT AND WASHER
TOP AND BOTTOM TRANSVERSE ANGLE BRACE.
ALTERNATE SIDES EVERY
BRACE
STIFFENER SHALL BE
SPOT WELDED.
"BLINE" B3162 OR EQUAL
PIPE SADDLE
INSULATION PER
CEC TABLE 123-A
TYPICAL PIPE. SEE
PLAN FOR SIZE
AND LOCATION
"B-LINE" - B3690
ADJUSTABLE "J"
HANGER
1
23
4
5
6
FINISHED FLOOR FLOOR DRAIN
P-TRAP
PPA1/2" MINIMUM FRESH
WATER MAKE-UP LINE
(TRAP PRIMER LINE)
1/2" TP LINE
1-1/2" X 12" 17 GAUGE FLUSH
VALVE PRIMER TUBE WITH 1/2"
COMPRESSION FITTING
3-1/4" MIN.
FLUSH VALVE
TAIL PIECE
FLOWB
6"
A
12
"
VACUUM BREAKER
PORTS
POSITION BEVELED END OF
PRIMER LINE FACING UP
TO CATCH WATER THAT
PASSES THROUGH THE
TAILPIECE
1 1/2" 17 GAUGE
2"
5/8" SHALLOW ESCUTCHEON
1/2" CHROME PLATED
TRAP PRIMER LINE 1/2" X 12"
1/2" COMPRESSION X 3/8" NPT.
CHROME PLATED
1/4" PER 1'-0"
SLOPE
BA
CLEANOUT AND ACCESS COVER.
TOP OF COVER TO BE FLUSH W/ TOP
OF FLOOR.
FLOOR LINE
1/8" C.I. BEND BALANCE OF PIPING SAME
AS CLEANOUT TO GRADE.
THREADED CLEANOUT PLUG
CLEANOUT TEE
CHROME PLATED STEEL
COVER PLATE WITH
SECURING SCREW
FINISHED WALL SURFACE
SCALE
NONE
SCALE
NONE
SCALE
NONE
SCALE
NONE
SCALE
NONE
SCALE
NONE
PIPING SUPPORT DETAIL
FLUSH VALVE TRAP PRIMER ASSEMBLYWATER HAMMER ARRESTOR DETAIL
DIA.
DRAIN LINE TO
DISCHARGE INDIRECTLY
PIPE PENETRATIONS IN
CABINETRY TO BE SEALED
WITH FLEXIBLE SEALER
AIR GAP = 2x DIA
1" MINIMUM
FLOOR SLAB
WASTE
FINISHED FLOOR
FLOOR GRATE
NOTE:
1. A AND B DIMENSIONS WILL VARY DEPENDING
UPON FLUSH VALVE HEAD USED.
2. PRIMING TUBE MAY BE CUT OFF TO ADJUST
FOR THE ROUGH-IN OF A FRESH WATER
MAKE-UP LINE TO FLOOR DRAIN TRAP.
3. THE FURTHEST RECOMMENDED DISTANCE
OF MAKE-UP LINE IS 20 FEET TO THE FLOOR
DRAIN.
TO FIXTURE UNITS
(TYP.)
HOT OR COLD
WATER SUPPLY
IF HORIZONTAL BRANCH
IS LESS THAN 20' LONG,
PROVIDE ONE WHA AT
END OF THE LINE
IF BRANCH IS GREATER
THAN 20' LONG, PROVIDE
ANOTHER WHA IN
MIDDLE, EACH SIZED FOR
HALF THE FIXTURE UNITS
PDI SIZE
"A"
CONTRACTOR SHALL PROVIDE WATER HAMMER
ARRESTERS BY PRECISION PLUMBING PRODUCTS, JAY
R SMITH, OR APPROVED EQUAL WITH PISTON AND
O-RING CONSTRUCTION, HAVING PDI #WH-201, ASSE
1010 AND ANSI a112.261M CERTIFICATION. INSTALL IN
HORIZONTAL OR VERTICAL POSITION, BUT NEVER
UPSIDE DOWN. INSTALL IN LINE WITH WATER FLOW
DIRECTION IF POSSIBLE. SIZE THE UNITS AS SHOWN ON
THE DRAWINGS AND/OR PER THE TABLES SHOWN.
RISER
ISOLATION VALVE
FITTING ADAPTER
THREADED END
CONNECTION
WATER HAMMER
ARRESTOR
3 3/8"∅
3
1
/
2
"
M
I
N
.
8
1
/
2
"
M
A
X
.
WATER HAMMER
ARRESTORS
LOCATED ABOVE
CEILING
FLOOR CLEANOUT
WALL CLEANOUT
NOTE:
CLEANOUT NOT TO BE
LOCATED IN CARPETED
AREA.
6" MIN.
PER CPC 906.1
FIN. ROOF
MIN. 12"
FROM A VERTICAL SURFACE
PARAPET OR
OTHER VERTICAL
SURFACE ABV.
ROOF
SEE ARCHITECTURAL
FOR VENT PIPE
FLASHING.
VENT TERMINATION
(LOCATE AT LEAST 10 FEET
FROM OUTSIDE AIR INTAKE)
A
A
3
2 1 2
A
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
4
2
:
4
4
A
M
P3.1
PLUMBING
DETAILS
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
RM/EG
625 S. CYPRESS
No. Description Date
1 90% CD 5/02/2024
2 PERMIT SET 5/17/2024
3 BACK CHECK SET 1/15/2025
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
As indicated
4/
4
/
2
0
2
5
1
1
:
4
2
:
4
5
A
M
P4.1
PLUMBING
TITLE-24
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
1/15/2025
Author
625 S. CYPRESS
No. Description Date
1 75% CD 3/15/2024
2 90% CD 5/02/2024
3 BACK CHECK SET 1/15/2025
3
(E) WATER VAULT
GAS METER
(E) LIGHT POST
TRANSFORMER
SD SD SD SD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD
SD SD SDSDSDSD
SD
SD
SD
SD
SD
NEIGHBOR
RESIDENCE
S.
C
Y
P
R
E
S
S
A
V
E
.
NEIGHBOR
RESIDENCE
NEIGHBOR
RESIDENCE
HISTORIC
BUILDING
(N) 8'-0" WROUGHT IRON PICKET FENCE, TYP.
(E) TREE TO REMAIN
NEW DRIVE APRON TO ALIGN
WITH ORIGINAL DRIVEWAY
CONFIGURATION.
PROPERTY LINE
(N) SECURITY PEDESTRIAN GATE
TR
A
S
H
/
R
E
C
Y
C
L
I
N
G
(N) SLIDING METAL 8'-0" SECURITY GATE
AL
L
E
Y
(N) SECURITY PEDESTRIAN GATE
CONCRETE PAVING
LEGEND
CONCRETE PAVING (2954 sf)
WALK ON BARK MULCH (494 sf)
WALK ON BARK MULCH
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
NL
3/16" = 1'-0"
L1.00
SITE PLAN
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
625 S. CYPRESS
SANTA ANA, CA
No.Description Date
NORTH
3/16" = 1'-0"L1.00
1 SITE PLAN 0'8'16'4'
STORM DRAIN
PERFORATED PIPE
LANDSCAPE AREA
GRAVEL SWALE
DEL RIO 3/8 GRAVEL (300 sf)
VEHICULAR CONCRETE PAVING
PAVING SURFACE
DEL RIO 3/8 GRAVEL
PAVING SURFACE
UTILITY BOXES, TYP.
NOTE:
1.PER CITY SPECIFICATIONS:
CONCRETE COLOR - 'DAVIS COLOR' ADOBE #61078
FINISH - GRACE TOPCAST RETARDER (15) YELLOW
2.LANDSCAPE CONTRACTOR TO COORDINATE AND OVERSEE IRRIGATION DESIGN AND INSTALLATION.
3.IRRIGATION NOTE TO FOLLOW THE CITY OF SANTA ANA IRRIGATION EQUIPMENT STANDARDS.
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
FLAG POLE
(E) WATER VAULT
GAS METER
(E) LIGHT POST
TRANSFORMER
SA
SD SD SD SD
SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDMR
MR
MR
MR MR MR
MR MR
MR
MR
MR SM
SM
SM
SM
SA
SM
SC
MR
MR
MR
MR MR
MRMR
CD
CD
CD
CD
AD
AD
CF
MR MR
MR
MR
MR
MR
MR
MR
CF
SD SD SDSDSDSD
SD
SD
SD
SD
SD
WUCOL WATER USE RATINGS
Very low VL
Low L
Moderate M
High H
Unknown /
PLANT SCHEDULE
Symbol Quantity Botanical name Common name Wucols Container Size Notes
TREE
2 Cercis canadensis 'Forest Pansy'Forest Pansy Redbud M 24" BOX -
SHRUBS
2 Arctostaphylos manzanita 'Dr.
Hurd'Dr. Hurd Manzanita L 15 GAL -
26 Muhlenbergia rigens Deergrass M 5 GAL -
1 Salvia apiana White Sage VL 5 GAL -
2 Salvia clevelandii Cleveland Sage VL 5 GAL -
5 Salvia mellifera Black Sage VL 5 GAL -
199 S.F.Carex divulsa European Meadow Sedge L 1 GAL -
AD
MR
SA
SC
PLANTS NOTE: (ALL) PLANTS ARE NATIVE TO ORANGE COUNTY, CA.
Scale
Project number
Date
Drawn by
Jen Dunbar, AIA
phone: 310.435.3928
12314 La Maida Street
Valley Village, CA 91607
jen@dunbararchitecture.com
DUNBAR
ARCHITECTURE
NL
3/16" = 1'-0"
L3.00
23004
CYPRESS STREET
FIRE STATION
REHABILITATION
CITY OF SANTA ANA
05/17/2024
625 S. CYPRESS
SANTA ANA, CA
No.Description Date
PLANTING PLAN
(N) SECURITY PEDESTRIAN GATE
(N) SLIDING METAL 8'-0" SECURITY GATE
AL
L
E
Y
(N) SECURITY PEDESTRIAN GATE
CONCRETE PAVING
WALK ON BARK MULCH
NEIGHBOR
RESIDENCE
S.
C
Y
P
R
E
S
S
A
V
E
.
NEIGHBOR
RESIDENCE
NEIGHBOR
RESIDENCE
HISTORIC
BUILDING
(N) 8'-0" WROUGHT IRON PICKET FENCE, TYP.
(E) TREE TO REMAIN
NEW DRIVE APRON TO ALIGN
WITH ORIGINAL DRIVEWAY
CONFIGURATION.
PROPERTY LINE
NORTH
3/16" = 1'-0"L3.00
1 PLANTING PLAN 0'8'16'4'
STORM DRAIN
PERFORATED PIPE
PAVING SURFACE
SM
CD
CF
CERCIS CANADENSIS 'FOREST PANSY', 24" BOX.
SCULPTURAL, MULTI TRUNK FORM.
CERCIS CANADENSIS 'FOREST PANSY', 24" BOX.
SINGLE TRUNK FORM.
DEL RIO 3/8 GRAVEL
PAVING SURFACE
UTILITY BOXES, TYP.
TR
A
S
H
/
R
E
C
Y
C
L
I
N
G
DESIGN DEVELOPMENT 1/12/2024
75% CD 3/15/2024
90% CD 5/14/2024
PERMIT SET 5/17/2024
VEHICULAR CONCRETE PAVING
NOTE:
1.PER CITY SPECIFICATIONS:
CONCRETE COLOR - 'DAVIS COLOR' ADOBE #61078
FINISH - GRACE TOPCAST RETARDER (15) YELLOW
2.LANDSCAPE CONTRACTOR TO COORDINATE AND OVERSEE IRRIGATION DESIGN AND INSTALLATION.
3.IRRIGATION NOTE TO FOLLOW THE CITY OF SANTA ANA IRRIGATION EQUIPMENT STANDARDS.
FLAG POLE
YES NO
INSTRUCTIONS:
ORAN GE COUNTY FI RE AUTHORI TY
Plan Submittal Criteria
COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects
and RESIDENTIAL TRACT developments
· Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place.
· Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section.
· If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA.
· In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations.
· Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding
requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602.
Address Suite City
Project Scope/Business Description
1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways,
curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within
300 feet of an active or proposed oil well? Fire Master Plan (PR145)
2. Property is adjacent to a wildland area or non-irrigated native vegetation?
Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124)
3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from
an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170)
4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving
private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475)
5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000
sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable
to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless
classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration
or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses
where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories
with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285)
6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card,
button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan
depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520)
7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment;
industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible
liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium
ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations?
Special Equipment Plan (PR315, PR340-PR382)
8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft
maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if
H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240)
9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard
commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330)
10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a
commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335)
Initial each of the following two items indicating that you have read and understand the statement:
11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is
required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed
Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications.
12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located
in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327—
Initials the building department will determine specific requirements.
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name Signature
Phone Number ( ) Date / /
Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA
review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the
applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the
appropriate plans and fees for OCFA review. 10-08-14 EE
COM
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Referral Form
Required for OCFA to review plans upon the request of the Building Department when
the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”.
City / County Official Requesting Review:
City / County Reference #: Date: __________________________________
City / County: _____________________________________ E-Mail: __________________________________
Contact Name: _____________________________________ Phone #: _________________________________
Title: _____________________________________
** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. **
Reason(s) for Review:
Please describe why OCFA Plan Review is or may be required by the City/County :
OCFA COMMENTS:
No further action required on this specific plan type, based
on information provided on: ____/______/______.
Project to be taken in for OCFA Review.
Other:
Name: _________________________________________
Contact #: ______________________________________ Date: _________________________________
OCFA Authorization
Updated: 06/02/2020 rs
GEOTECHNICAL INVESTIGATION
PROPOSED IMPROVEMENTS TO
EXISTING FIRE STATION
625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
APRIL 23, 2024
PROJECT NO. W1895-88-01
PREPARED FOR:
Dunbar Architecture
Valley Village, California
2807 McGaw Avenue ■ Irvine, CA 92618 ■ Telephone (949) 491-6570 ■ oc@geoconinc.com
Project No. W1895-88-01
April 23, 2024
Dunbar Architecture
12314 La Maida Street
Valley Village, CA 91607
Subject: GEOTECHNICAL INVESTIGATION
PROPOSED IMPROVEMENTS TO EXISTING FIRE STATION
625 CYPRESS AVENUE, SANTA ANA, CALIFORNIA
Ladies and Gentlemen:
In accordance with your authorization of our proposal dated February 8, 2024, we have performed a
geotechnical investigation for proposed structural retrofit improvements to the existing fire station
located at 625 Cypress Avenue in the City of Santa Ana, California. The accompanying report presents
the findings of our study and our conclusions and recommendations pertaining to the geotechnical
aspects of proposed design and construction. Based on the results of our investigation, it is our opinion
that the site can be developed as proposed, provided the recommendations of this report are followed
and implemented during design and construction.
If you have any questions regarding this report, or if we may be of further service, please contact the
undersigned.
Very truly yours,
GEOCON WEST, INC.
217 CEG 2251
(email) Addressee
625 Cypress Avenue
Geotechnical Investigation
TABLE OF CONTENTS
1. PURPOSE AND SCOPE ....................................................................................................................... 1
2. SITE AND PROJECT DESCRIPTION ..................................................................................................... 2
3. GEOLOGIC SETTING .......................................................................................................................... 2
4. SOIL AND GEOLOGIC CONDITIONS ................................................................................................... 3
4.1 Artificial Fill ............................................................................................................................ 3
4.2 Younger Alluvium ................................................................................................................... 3
5. GROUNDWATER ............................................................................................................................... 3
6. GEOLOGIC HAZARDS ........................................................................................................................ 4
6.1 Surface Fault Rupture ............................................................................................................ 4
6.2 Seismicity ............................................................................................................................... 5
6.3 Site-Specific Ground Motion Hazard Analysis........................................................................ 6
6.3.1 Probabilistic Seismic Hazard Analysis ....................................................................... 6
6.3.2 Deterministic Seismic Hazard Analysis ..................................................................... 7
6.3.3 Site-Specific Response Spectrum .............................................................................. 7
6.3.4 Site-Specific Seismic Design Criteria ......................................................................... 8
6.3.5 Site-Specific Peak Ground Acceleration .................................................................... 9
6.3.6 Deaggregated Seismic Source Parameters ............................................................. 10
6.4 Liquefaction Potential .......................................................................................................... 10
6.5 Seismically-Induced Settlement ........................................................................................... 12
6.6 Slope Stability....................................................................................................................... 12
6.7 Earthquake-Induced Flooding .............................................................................................. 12
6.8 Tsunamis, Seiches, and Flooding ......................................................................................... 13
6.9 Oil Fields & Methane Potential ............................................................................................ 13
6.10 Subsidence ........................................................................................................................... 13
7. CONCLUSIONS AND RECOMMENDATIONS .................................................................................... 14
7.1 General ................................................................................................................................. 14
7.2 Soil and Excavation Characteristics ...................................................................................... 16
7.3 Minimum Resistivity, pH, and Water-Soluble Sulfate .......................................................... 17
7.4 Grading ................................................................................................................................. 18
7.5 Existing Foundations ............................................................................................................ 20
7.6 New Foundation Design ....................................................................................................... 21
7.7 Lateral Design ...................................................................................................................... 23
7.8 Concrete Slabs-on-Grade ..................................................................................................... 23
7.9 Preliminary Pavement Recommendations .......................................................................... 25
7.10 Temporary Excavations ........................................................................................................ 27
7.11 Trench Shoring ..................................................................................................................... 27
7.12 Stormwater Infiltration ........................................................................................................ 30
7.13 Surface Drainage .................................................................................................................. 32
7.14 Plan Review .......................................................................................................................... 32
LIMITATIONS AND UNIFORMITY OF CONDITIONS
LIST OF REFERENCES
625 Cypress Avenue
Geotechnical Investigation
TABLE OF CONTENTS (CONTINUED)
MAPS AND ILLUSTRATIONS
Figure 1, Vicinity Map
Figure 2, Site Plan
Figure 3A, Test Pit 1 Section
Figure 3B, Test Pit 2 Section
Figure 4, Regional Fault Map
Figure 5, Regional Seismicity Map
Figures 6 through 11, Design Response Spectrum
Figure 12, Deterministic Scenario Events
Figures 13 and 14, DE Empirical Estimation of Liquefaction Potential
Figures 15 and 16, MCE Empirical Estimation of Liquefaction Potential
Figures 17 and 18, Evaluation of Earthquake-Induced Settlements
Figures 19 and 20, Percolation Test Results
APPENDIX A FIELD INVESTIGATION
Figures A1 through A4, Boring Logs
Figures A5 and A6, Test Pit Logs
APPENDIX B
LABORATORY TESTING
Figures B1 through B6, Direct Shear Test Results
Figures B7 through B15, Consolidation Test Results
Figure B16, Atterberg Limits Test Results
Figures B17 and B18, Grain Size Analysis Test Results
Figure B19, Expansion Index Test Results
Figure B20, Modified Compaction Test Results
Figure B21, Corrosivity Test Results
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 1 - April 23, 2024
GEOTECHNICAL INVESTIGATION
1. PURPOSE AND SCOPE
This report presents the results of a geotechnical investigation for the proposed structural retrofit
improvements to the existing fire station located at 625 Cypress Avenue in the City of Santa Ana,
California (see Vicinity Map, Figure 1). The purpose of the investigation was to evaluate subsurface soil
and geologic conditions underlying the site and, based on conditions encountered, to provide
conclusions and recommendations pertaining to the geotechnical aspects of proposed design and
construction.
The scope of this investigation included a site reconnaissance, field exploration, laboratory testing,
engineering analysis, and the preparation of this report. The site was explored on March 4, 2023, by
excavating two 8-inch-diameter borings using a truck-mounted hollow-stem auger drilling machine to
depths of approximately 25 and 61 feet beneath the ground surface. In addition, a 4-inch-diameter
boring was excavated to a depth of approximately 5 feet below ground surface using hand auger
equipment. Percolation testing was performed in borings B2 and B3 to determine the infiltration rate
of site soils. The site was further explored on March 13 and 14, 2024, by excavating two test pits to
depths of approximately 15½ feet below the ground surface using hand tools and mechanical
equipment. The test pits were excavated at the existing building foundations to verify footing depth
and dimensions. The approximate locations of the exploratory borings and test pits are depicted on the
Site Plan (see Figure 2). A detailed discussion of the field investigation, including boring and test pits
logs, is presented in Appendix A.
Laboratory tests were performed on selected soil samples obtained during the investigation to
determine pertinent physical and chemical soil properties. Appendix B presents a summary of the
laboratory test results.
The recommendations presented herein are based on analysis of the data obtained during the
investigation and our experience with similar soil and geologic conditions. References reviewed to
prepare this report are provided in the List of References section.
If project details vary significantly from those described herein, Geocon should be contacted to
determine the necessity for review and possible revision of this report.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 2 - April 23, 2024
2. SITE AND PROJECT DESCRIPTION
The subject site is located at 625 Cypress Avenue in the City of Santa Ana, California. The site is currently
occupied by a single-story, wood-framed structure and is bounded by a single-story residential
structure to the north and south, by an alley way to the east, and by Cypress Avenue to the west. The
site is relatively level and surface water drainage at the site appears to flow to the city streets.
Vegetation consists of a dirt lawn located in front of the house.
Based on the information provided by the Client, it is our understanding that the existing single-story,
wood-framed structure will undergo voluntary seismic retrofit improvements. The scope of the
renovations is anticipated to include new wood-framed shear walls and new foundations. The existing
site conditions are shown on the Site Plan (see Figure 2). It is anticipated that the proposed
improvements will be supported on both existing and new foundations.
Based on the preliminary nature of the design at this time, wall and column loads were not available.
It is anticipated that column loads for the proposed improvements will be up to 50 kips, and wall loads
will be up to 2 kips per linear foot.
Once the design phase and foundation loading configuration proceeds to a more finalized plan, the
recommendations within this report should be reviewed and revised, if necessary. Any changes in the
design, location or elevation of any structure, as outlined in this report, should be reviewed by this
office. Geocon should be contacted to determine the necessity for review and possible revision of this
report.
3. GEOLOGIC SETTING
The subject site is situated at the south-central portion of the Orange County Coastal Plain, a relatively
flat-lying alluviated surface with an average slope of less than 20 feet per mile. The lowland surface is
bounded by hills and mountains on the north and east and by the Pacific Ocean to the south and
southwest (Department of Water Resources, 1967). Prominent structural features within the Orange
County Coastal Plain include the central lowland plain, the northwest trending line of low hills and
mesas underlain by the Newport-Inglewood fault zone along the coast (Newport Mesa, Huntington
Beach Mesa, Bolsa Chica Mesa, and Landing Hill), and the San Joaquin Hills to the southeast
(Department of Water Resources, 1967).
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 3 - April 23, 2024
4. SOIL AND GEOLOGIC CONDITIONS
Based on published geologic maps of the area, the site is underlain by artificial fill and Holocene age
young alluvial fan deposits that consist of clay, silt, and sand (California Geological Survey, 2012).
Detailed stratigraphic profiles of the materials encountered at the site are provided on the boring and
test pit logs in Appendix A.
4.1 Artificial Fill
Artificial fill was encountered in our explorations to a maximum depth of 5 feet below existing ground
surface. The artificial fill generally consists of dark brown clay with some fine to medium-grained sand
and can be characterized as slightly moist to moist and soft to firm. The fill is likely the result of past
grading or construction activities at the site. Deeper fill may exist between excavations and in other
portions of the site that were not directly explored.
4.2 Younger Alluvium
Holocene age young alluvial fan deposits were encountered beneath the fill to the maximum depth
explored of 61 feet below existing ground surface. The alluvium consisted of dark brown clay to sandy
clay, and poorly-graded sand from 3 to 13½ feet below ground surface. These soils can be characterized
as slightly moist to moist and soft to stiff, or loose. Below 13½ feet, the soils were predominantly dark
yellowish brown silt and clay with various amounts of sand. These soils can be characterized as soft to
stiff and dry to wet.
5. GROUNDWATER
Review of the Seismic Hazard Zone Report for the Tustin Quadrangle (California Division of Mines and
Geology [CDMG], 2001) indicates that the historically highest groundwater level in the area is
approximately 35 feet beneath the existing ground surface. Groundwater information presented in this
document is generated from data collected in the early 1900’s to the late 1990s.
Groundwater was encountered in boring B1 at a depth of 49½ feet below the existing ground surface.
Based on the depth of groundwater in our borings, the reported historic high groundwater levels in the
immediate area (CDMG, 2001), and the depth of proposed construction, static groundwater is neither
expected to be encountered during construction, nor have a detrimental effect on the project.
However, it is not uncommon for groundwater levels to vary seasonally or for groundwater seepage
conditions to develop where none previously existed (especially in impermeable fine-grained soils
which are heavily irrigated or after seasonal rainfall), groundwater seepage levels encountered during
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 4 - April 23, 2024
construction may be actually higher than those encountered during our investigation. In addition,
recent requirements for storm water infiltration could result in shallower seepage conditions in the
region. Proper surface drainage of irrigation and precipitation will be critical for future performance of
the project. Recommendations for drainage are provided in the Surface Drainage section of this report
(see Section 7.13).
6. GEOLOGIC HAZARDS
6.1 Surface Fault Rupture
The numerous faults in Southern California include Holocene-active, pre-Holocene, and inactive faults.
The criteria for these major groups are based on criteria developed by the California Geological Survey
(CGS, formerly known as CDMG) for the Alquist-Priolo Earthquake Fault Zone Program (CGS, 2018). By
definition, a Holocene-active fault is one that has had surface displacement within Holocene time
(about the last 11,700 years). A pre-Holocene fault has demonstrated surface displacement during
Quaternary time (approximately the last 1.6 million years) but has had no known Holocene movement.
Faults that have not moved in the last 1.6 million years are considered inactive.
The site is not within a state-designated Alquist-Priolo Earthquake Fault Zone (CGS, 2024a; 2024b) for
surface fault rupture hazards. No Holocene-active or pre-Holocene faults with the potential for surface
fault rupture are known to pass directly beneath the site. Therefore, the potential for surface rupture
due to faulting occurring beneath the site during the design life of the proposed development is
considered low. However, the site is located in the seismically active Southern California region, and
could be subjected to moderate to strong ground shaking in the event of an earthquake on one of the
many active Southern California faults. The faults in the vicinity of the site are shown in Figure 4,
Regional Fault Map.
The closest trace of a Holocene-active fault to the site is the Newport-Inglewood Fault Zone located
approximately 8.6 miles to the southwest (Ziony and Jones, 1989). Other nearby active faults are the
Whittier Fault, the Glen Ivy section of the Elsinore Fault, and the Chino Fault located approximately 12½
miles north, 15½ miles northeast, and 16½ miles northeast of the site, respectively (Ziony and Jones,
1989). The active San Andreas Fault Zone is located approximately 43 miles northeast of the site.
Several buried thrust faults, commonly referred to as blind thrusts, underlie the Los Angeles Basin
(including the Orange County Coastal Plain) at depth. These faults are not exposed at the ground
surface and are typically identified at depths greater than 3.0 kilometers. The October 1, 1987, Mw 5.9
Whittier Narrows earthquake and the January 17, 1994, Mw 6.7 Northridge earthquake were a result
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 5 - April 23, 2024
of movement on the Puente Hills Blind Thrust and the Northridge Thrust, respectively. These thrust
faults and others in the greater Los Angeles area are not exposed at the surface and do not present a
potential surface fault rupture hazard at the site; however, these deep thrust faults are considered
active features capable of generating future earthquakes that could result in moderate to significant
ground shaking at the site.
6.2 Seismicity
As with all of Southern California, the site has experienced historic earthquakes from various regional
faults. The seismicity of the region surrounding the site was formulated based on research of an
electronic database of earthquake data. The epicenters of recorded earthquakes with magnitudes
equal to or greater than 5.0 in the site vicinity are depicted on Figure 5, Regional Seismicity Map.
A partial list of moderate to major magnitude earthquakes that have occurred in the Southern California
area within the last 100 years is included in the following table.
LIST OF HISTORIC EARTHQUAKES
Magnitude
Long Beach March 10, 1933 6.4 10 SW
NW
NW
Whittier Narrows October 1, 1987 5.9 25 NW
NNW
ENE
ENE
Northridge January 17, 1994 6.7 50 NW
ENE
N
The site could be subjected to strong ground shaking in the event of an earthquake. However, this
hazard is common in Southern California and the effects of ground shaking can be minimized if the
proposed structures are designed and constructed in conformance with current building codes and
engineering practices.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 6 - April 23, 2024
6.3 Site-Specific Ground Motion Hazard Analysis
A site-specific ground motion hazard analysis was performed in accordance with ASCE 7-16 Chapter
21 and Section 1613 of the 2022 CBC.
6.3.1 Probabilistic Seismic Hazard Analysis
The risk-targeted Maximum Considered Earthquake (MCER) probabilistic response spectrum consists of
the spectral response accelerations which are expected to achieve a 1 percent probability of collapse
within a 50-year period, evaluated at 5 percent damping.
The median spectral response accelerations having a 2 percent chance of exceedance in 50 years were
evaluated at 5 percent damping using the USGS PSHA hazard platform used in the National Seismic
Hazard Mapping Project, NSHMP-HAZ. The soil underlying the site was modeled as a Site Class “D” with
a corresponding average shear wave velocity (VS30) of 270 meters per second. The site class
determination is based on Standard Penetration Test blow count data.
NSHMP-HAZ uses the ground motion prediction equations (GMPEs) from the NGA-West 2 project:
Abrahamson-et al. (2014) NGA West 2, Boore et al. (2014) NGA West 2, Campbell-Bozorgnia (2014) NGA
West 2, and Chiou-Youngs (2014) NGA West 2. Each GMPE was assigned an equal weight and the
median value of the four GMPEs was evaluated. The median spectral accelerations were rotated to
maximum direction using the period specific ratios from Shahi et al. (2013 & 2014).
The GMPE of Campbell and Borzorgnia requires that the depth to where the shear wave velocity reaches
2.5 kilometers per second (Z2.5) be defined. Additionally, the GMPEs of Abrahamson-et al., Boore et al.
and Chiou-Youngs require that the depth to where the shear wave velocity reaches 1 kilometer per
second (Z1.0) be defined. The values of Z2.5 and Z1.0 were estimated using data from the Community
Velocity Model (CVM) Version 4 developed by Southern California Earthquake Data Center (SCEDC)
accessed by the OpenSHA Site Data Application (v1.5.2).
The MCE uniform hazard response spectrum was adjusted to risk-targeted spectral accelerations
corresponding to a 1 percent chance of collapse in 50 years by using the USGS Risk-Targeted Ground
Motion Calculator and following ASCE 7-16 Section 21.2.1.2 Method 2.
The risk-targeted Maximum Considered Earthquake (MCER) probabilistic response spectrum is provided
on Figure 6.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 7 - April 23, 2024
6.3.2 Deterministic Seismic Hazard Analysis
In order to define the deterministic scenario events, deaggregation of the uniform hazard probabilistic
response spectrum was performed using the USGS Uniform Hazard Tool. The inversion approach used
by UCERF-3 allows for a large number of variations for each source scenario, including multi-fault
ruptures. Therefore, deaggregation of UCERF-3 consists of the contributions from multi-fault ruptures
rather than individual source contributions. To address this, the USGS Unified Hazard Tool aggregates
the contributions on a per-fault-section basis, with rupture contributions only ever counted once. The
Unified Hazard Tool deaggregation contributor list shows the fault sections which contribute most to
hazard at a site and reports a mean earthquake magnitude for each section identified by a 'parent'
fault name and section index. Based on the deaggregation, we have considered scenario events with
the greatest contribution to the deterministic ground motions.
The magnitudes of the deterministic scenario events were based on the BSSC 2014 Scenario Event
Catalog which includes the parent fault identified in the deaggregation and which has the largest
earthquake magnitude. Other fault source parameters were defined by the values in the BSSC2014
Scenario Catalog. The values of Z2.5 and Z1.0 were estimated using data from the Community Velocity
Model (CVM) Version 4 developed by Southern California Earthquake Data Center (SCEDC) accessed by
the OpenSHA Site Data Application (v1.5.2).
The input values used to evaluate the deterministic scenario(s) are provided on Figure 12. The
deterministic median and standard deviation (sigma) for the scenario events were evaluated using the
USGS NSHMP-HAZ-WS Response Spectra online application. The deterministic analysis used the same
four GMPEs, equally weighted, to generate the median and standard deviation of the ground motion
which were then used to calculate the 84th percentile at 5% damping. The median spectral accelerations
were rotated to maximum direction using the period specific ratios from Shahi et al. (2013 & 2014).
The deterministic scenarios were compared, and the event occurring on the San Joaquin Hills fault is
considered the controlling deterministic event.
The 84th percentile maximum rotated component deterministic response spectrum is provided on
Figure 7.
6.3.3 Site-Specific Response Spectrum
The lesser of the probabilistic and deterministic MCER response spectra is the Site-Specific MCER. Two
thirds of the Site-Specific MCER is the Design Earthquake (DE) Response Spectrum, provided the results
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 8 - April 23, 2024
are not less than 80 percent of the modified General Design Response Spectrum determined by ASCE
7-16 Section 11.4.6 with Fa and Fv determined as specified in Section 21.3.
Graphical representations of the analyses are presented on Figures 6 and 7. The Site-Specific Design
Earthquake response spectrum at 5 percent damping is presented on Figure 7 and in tabular form on
Figure 8.
6.3.4 Site-Specific Seismic Design Criteria
Based the site-specific ground motion hazard analysis performed, and in accordance with the ASCE
7-16 Section 21.4 and ASCE 41-17 Section 2.4.2, site-specific design acceleration parameters shall be
derived using the results of the site-specific ground motion hazard analysis.
The parameter SDS shall be taken as equal to 90 percent of the maximum spectral acceleration
obtained from the site-specific analysis at any period within the range from 0.2 to 5 seconds,
inclusive. The parameter SD1 shall be taken as the maximum value of the product of the spectral
acceleration and period for periods from 1 to 5 seconds, inclusive. The values of SMS and SM1 shall be
taken as 1.5 times the site-specific values of SDS and SD1. The site-specific design acceleration
parameters shall not be less than 80 percent of the general seismic design values determined by ASCE
7-16 Section 11.4.
The following tables presents the site-specific seismic design parameters based on the site-specific
ground motion hazard analysis.
SITE-SPECIFIC DESIGN ACCELERATION PARAMETERS
Parameter Value
Site Class Modified MCER
Acceleration (short), SMS 1.759g
R
Acceleration – (1 sec), SM1 1.188g
Spectral Response Acceleration (short), SDS 1.172g
Spectral Response Acceleration (1 sec), SD1 0.792g
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 9 - April 23, 2024
ASCE 41-17 SITE-SPECIFIC SEISMIC DESIGN PARAMETERS
Parameter Value
Spectral Response Acceleration (short) SXS, BSE-2N 1.759g
Spectral Response Acceleration (1 sec) SX1, BSE-2N 1.188g
Spectral Response Acceleration (short) SXS, BSE-1N 1.172g
Spectral Response Acceleration (1 sec) SX1, BSE-1N 0.792g
Spectral Response Acceleration (short) SXS, BSE-2E 1.371g
Spectral Response Acceleration (1 sec) SX1, BSE-2E 0.905g
Spectral Response Acceleration (short) SXS, BSE-1E 0.808g
Spectral Response Acceleration (1 sec) SX1, BSE-1E 0.472g
6.3.5 Site-Specific Peak Ground Acceleration
The site-specific Maximum Considered Earthquake (MCEG) peak ground acceleration was evaluated in
accordance with ASCE 7-16 Section 21.5. The significant difference between the MCEG peak ground
acceleration and the analysis presented above is that the MCEG is calculated without the risk-targeted
adjustment factors.
The probabilistic and deterministic 84th percentile peak ground accelerations were analyzed using the
same approaches as described above. The analysis used the same Site Class and scenario earthquake.
However, within the probabilistic calculation, the risk-targeted adjustment factor was not applied.
The deterministic MCEG shall not be less than 0.5FPGA, where FPGA is determined from ASCE 7-16 Table
11.8-1 with the value of PGA taken as 0.5g. The site-specific MCEG peak ground acceleration is taken as
the lesser of the probabilistic and deterministic MCEG, provided the value is not less than 80 percent of
the value of PGAM as determined by ASCE 7-16 Equation 11.8.1.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 10 - April 23, 2024
ASCE 7-16 SITE-SPECIFIC PEAK GROUND ACCELERATION
Parameter Value ASCE 7-16 Reference
Site-Specific MCEG
PGAM 0.651g Section 21.5
6.3.6 Deaggregated Seismic Source Parameters
Deaggregation of the MCE peak ground acceleration was performed using the USGS online Unified
Hazard Tool, 2014 Conterminous U.S. Dynamic edition (v4.2.0). The result of the deaggregation analysis
indicates that the predominant earthquake contributing to the MCE peak ground acceleration is
characterized as a 7.3 magnitude event occurring at a hypocentral distance of 12.72 kilometers from
the site.
Deaggregation was also performed for the Design Earthquake (DE) peak ground acceleration, and the
result of the analysis indicates that the predominant earthquake contributing to the DE peak ground
acceleration is characterized as a 6.47 magnitude occurring at a hypocentral distance of 26.94
kilometers from the site.
Conformance to the criteria in the above tables for seismic design does not constitute any kind of
guarantee or assurance that significant structural damage or ground failure will not occur if a large
earthquake occurs. The primary goal of seismic design is to protect life, not to avoid all damage, since
such design may be economically prohibitive.
6.4 Liquefaction Potential
Liquefaction is a phenomenon in which loose, saturated, relatively cohesionless soil deposits lose shear
strength during strong ground motions. Primary factors controlling liquefaction include intensity and
duration of ground motion, gradation characteristics of the subsurface soils, in-situ stress conditions,
and the depth to groundwater. Liquefaction is typified by a loss of shear strength in the liquefied layers
due to rapid increases in pore water pressure generated by earthquake accelerations.
The current standard of practice, as outlined in the “Recommended Procedures for Implementation of
DMG Special Publication 117, Guidelines for Analyzing and Mitigating Liquefaction in California” and
“Special Publication 117A, Guidelines for Evaluating and Mitigating Seismic Hazards in California”
requires liquefaction analysis to a depth of 50 feet below the lowest portion of the proposed structure.
Liquefaction typically occurs in areas where the soils below the water table are composed of poorly
consolidated, fine- to medium-grained, primarily sandy soil. In addition to the requisite soil conditions,
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 11 - April 23, 2024
the ground acceleration and duration of the earthquake must also be of a sufficient level to induce
liquefaction.
A review of the State of California Seismic Hazard Zone Map for the Tustin Quadrangle indicates that
the site is located within an area designated as having a potential for liquefaction. Groundwater was
encountered during our site exploration at a depth of 49½ feet below ground surface. The historic high
groundwater level in the area is reported to be between 30 and 40 feet beneath the existing ground
surface (CDMG 2001).
Liquefaction analysis of the soils underlying the site was performed using the 1996 NCEER method
of analysis with the updates by Youd et al. (2001). This semi-empirical method is based on a
correlation between values of Standard Penetration Test (SPT) resistance and field performance data.
To supplement the SPT blow count data, California Modified Sampler blow count data was converted
to equivalent SPT blow counts based on a correlation factor of 0.55 (Rogers, 2006).
Screening criteria developed by Bray and Sancio (2006) characterize fine-grained soils which are not
susceptible to liquefaction as soils with a plasticity index (PI) that is greater than 18 or with a saturated
moisture content that is less than 80 percent of the liquid limit. In order to apply the screening criteria,
laboratory testing was performed to evaluate the Atterberg Limits and saturated moisture content of
select soil samples. Laboratory test results used for the screening criteria are presented as Figure B16.
The liquefaction analysis was performed for a Design Earthquake level by using a historic high
groundwater table of 35 feet below the ground surface, a magnitude 6.47 earthquake, and a peak
horizontal acceleration of 0.434g (⅔PGAM). The enclosed liquefaction analysis, included herein for
boring B1, indicates that the alluvial soils below the historic high groundwater level could be susceptible
to approximately 0.3 inch of total settlement during Design Earthquake ground motion (see enclosed
calculation sheets, Figures 13 and 14).
It is our understanding that the intent of the Building Code is to maintain “Life Safety” during Maximum
Considered Earthquake level events. Therefore, additional analysis was performed to evaluate the
potential for liquefaction during a MCE event. The structural engineer should evaluate the proposed
structure for the anticipated MCE liquefaction induced settlements and verify that anticipated
deformations would not cause the foundation system to lose the ability to support the gravity loads
and/or cause collapse of the structure.
The liquefaction analysis was performed for the Maximum Considered Earthquake level by using a
historic high groundwater table of 35 feet below the ground surface, a magnitude 7.3 earthquake, and
a peak horizontal acceleration of 0.651g (PGAM). The enclosed liquefaction analysis, included herein for
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 12 - April 23, 2024
boring B1, indicates that the alluvial soils below the historic high groundwater level could be susceptible
to approximately 0.3 inch of total settlement during Maximum Considered Earthquake ground motion
(see enclosed calculation sheets, Figures 15 and 16).
6.5 Seismically-Induced Settlement
Dynamic compaction of dry and loose sands may occur during a major earthquake. Typically,
settlements occur in thick beds of such soils. The seismically-induced settlement calculations were
performed in accordance with the American Society of Civil Engineers, Technical Engineering and
Design Guides as adapted from the US Army Corps of Engineers, No. 9.
The calculations provided herein for boring B1 indicate that the soil above the historic high
groundwater level of 35 feet could be prone to approximately 0.14 inch of settlement as a result of the
Design Earthquake peak ground acceleration (⅔PGAM).
The calculations provided herein for boring B1 indicate that the soil above the historic high
groundwater level of 35 feet could be prone to approximately 0.42 inch of settlement as a result of the
Maximum Considered Earthquake peak ground acceleration (PGAM).
Calculation of the anticipated seismically induced settlements is provided as Figures 17 and 18.
6.6 Slope Stability
The topography at the site is relatively level and the topography in the immediate site vicinity slopes
very gently to the south-southwest. The site is not within an area identified as having a potential for
slope stability hazards (City of Santa Ana, 2010) or seismic slope instability hazards (CDMG, 2001). There
are no known landslides near the site, nor is the site in the path of any known or potential landslides
(USGS, 2024a). Therefore, the potential for slope stability hazards to adversely affect the proposed
development is considered low.
6.7 Earthquake-Induced Flooding
Earthquake-induced flooding is inundation caused by failure of dams or other water-retaining
structures due to earthquakes. A review of the Safety Element of the Orange County General Plan
(2004) and the City of Santa Ana Seismic Safety Element (2010) indicates that the site is not located
within the inundation boundaries of upgradient dams, rivers, creeks, or reservoirs. The probability of
earthquake-induced flooding is considered very low.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 13 - April 23, 2024
6.8 Tsunamis, Seiches, and Flooding
The site is not located within a coastal area. Therefore, tsunamis are not considered a significant hazard
at the site.
Seiches are large waves generated in enclosed bodies of water in response to ground shaking. No major
water-retaining structures are located immediately up gradient from the project site. Therefore,
flooding resulting from a seismically induced seiche is considered unlikely.
The site is within an area of minimal flooding (Zone X) as defined by the Federal Emergency
Management Agency (FEMA, 2024; LADPW, 2024).
6.9 Oil Fields & Methane Potential
Based on a review of the California Geologic Energy Management Division (CalGEM) Well Finder
Website, the site is not located within an oil field and oil or gas wells are not documented within ½-mile
of the site (CalGEM, 2024). However, due to the voluntary nature of record reporting by the oil well
drilling companies, wells may be improperly located or not shown on the location map and
undocumented wells could be encountered during construction. Any wells encountered during
construction will need to be properly abandoned in accordance with the current requirements of the
CalGEM.
Since the site is not located within the boundaries of a known oil field, the potential for the presence
of methane or other volatile gases at the site is considered low. However, should it be determined that
a methane study is required for the proposed development it is recommended that a qualified methane
consultant be retained to perform the study and provide mitigation measures as necessary.
6.10 Subsidence
Subsidence occurs when a large portion of land is displaced vertically, usually due to the withdrawal of
groundwater, oil, or natural gas. Soils that are particularly subject to subsidence include those with high
silt or clay content. The site is not located within an area of known ground subsidence (USGS, 2024b).
No large-scale extraction of groundwater, gas, oil, or geothermal energy is occurring or planned at the
site or in the general site vicinity. There appears to be little or no potential for ground subsidence due
to withdrawal of fluids or gases at the site.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 14 - April 23, 2024
7. CONCLUSIONS AND RECOMMENDATIONS
7.1 General
7.1.1 It is our opinion that neither soil nor geologic conditions were encountered during the
investigation that would preclude the construction of the proposed development provided
the recommendations presented herein are followed and implemented during design and
construction.
7.1.2 Up to 5 feet of existing artificial fill was encountered during the site investigation. The existing
fill encountered is believed to be the result of past grading and construction activities at the
site. Deeper fill may exist in other areas of the site that were not directly explored It is our
opinion that the existing fill, in its present condition, is suitable for continued support of the
existing foundations and structural loads, as well as existing concrete slabs-on-grade and
replacement slab sections. However, the existing fill is not considered suitable for direct
support of new foundations. The existing fill and site soils are suitable for re-use as
engineered fill provided the recommendations in the Grading section of this report are
followed (see Section 7.4).
7.1.3 The enclosed seismically induced settlement analyses indicate that the site soils could be
susceptible up to approximately ½ inch of total settlement as a result of the Design
Earthquake peak ground acceleration (⅔PGAM). The resulting differential settlement is
anticipated to be less than ¼ inch over a distance of 30 feet.
7.1.4 The project structural engineer should evaluate the existing foundations, existing building
loads, and proposed improvement loads. Where excess foundation capacity remains, the
existing foundations may be utilized to support additional loads associated with the proposed
improvements (see Section 7.5). However, adding heavier loads to existing foundations could
induce settlements which could be detrimental to existing structural connections.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 15 - April 23, 2024
7.1.5 Based on these considerations, where new footings are required for support of the proposed
improvements, conventional foundations may be used. Foundations should derive support
in the undisturbed alluvial soils found at and below a depth of 5 feet. Foundations should be
deepened as necessary to penetrate through any unsuitable soils and derive support
exclusively in the undisturbed alluvial soils. All foundation excavations must be observed and
approved in writing by the Geotechnical Engineer (a representative of Geocon) prior to
placement of steel or concrete. Recommendations for the design of a conventional
foundation system are provided in Section 7.6.
7.1.6 Where new foundations are constructed immediately adjacent to existing foundations, the
new foundation should be deepened to match the depth of the existing foundation to
prevent a surcharge on the existing foundation.
7.1.7 Where a proposed foundation will be deeper than an existing adjacent offsite foundation,
the proposed foundation must be designed to resist the surcharge imposed by the existing
foundation. The surcharge area may be defined by a 1:1 projection down and away from the
bottom of the foundation.
7.1.8 All excavations must be observed and approved in writing by the Geotechnical Engineer
(a representative of Geocon).
7.1.9 Where new concrete slab-on-grade is to be constructed, it is recommended that any soils
disturbed during construction activities be properly compacted for slab support.
Recommendations for earthwork are provided in the Grading section of this report (see
Section 7.4).
7.1.10 Where new paving is to be placed, it is recommended that all existing fill and soft alluvial
soils be excavated and properly compacted for paving support. The client should be aware
that excavation and compaction of all existing fill and soft alluvial soils in the area of new paving
is not required; however, paving constructed over existing uncertified fill or unsuitable
alluvial soil may experience increased settlement and/or cracking and may therefore have a
shorter design life and increased maintenance costs. As a minimum, the upper 12 inches of
subgrade soil should be scarified and properly compacted for paving support. Paving
recommendations are provided in the Preliminary Pavement Recommendations section of this
report (see Section 7.9).
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 16 - April 23, 2024
7.1.11 Excavations up to 7 feet in vertical height may be required for the construction of new
foundations for proposed improvements. Performing open excavations adjacent to or deeper
than the existing foundation system could potentially remove lateral support and/or
undermine the existing foundation. Excavation for construction of new foundations
immediately adjacent to existing foundations may require special excavation measures in
order to maintain lateral support of the existing adjacent foundation. Recommendations for
Temporary Excavations are provided in Section 7.10.
7.1.12 Based on the results of the percolation testing, a stormwater infiltration system is considered
feasible for this project. Recommendations for infiltration are provided in the Stormwater
Infiltration section of this report (see Section 7.12).
7.1.13 Once the design and foundation loading configuration for the proposed structure proceeds
to a more finalized plan, the recommendations within this report should be reviewed and
revised, if necessary. Based on the final foundation loading configurations, the potential for
settlement should be re-evaluated by this office.
7.1.14 Any changes in the design, location or elevation, as outlined in this report, should be
reviewed by this office. Geocon should be contacted to determine the necessity for review
and possible revision of this report.
7.1.15 The most recent ASTM standards apply to this project and must be utilized, even if older
ASTM standards are indicated in this report.
7.2 Soil and Excavation Characteristics
7.2.1 The in-situ soils can be excavated with moderate effort using conventional excavation
equipment. Some caving should be anticipated in unshored excavations, especially where
granular soils are encountered.
7.2.2 It is the responsibility of the contractor to ensure that all excavations and trenches are
properly shored and maintained in accordance with applicable OSHA rules and regulations to
maintain safety and maintain the stability of existing adjacent improvements.
7.2.3 All onsite excavations must be conducted in such a manner that potential surcharges from
existing structures, construction equipment, and vehicle loads are resisted. The surcharge
area may be defined by a 1:1 projection down and away from the bottom of an existing
foundation or vehicle load. Penetrations below this 1:1 projection will require special
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 17 - April 23, 2024
excavation measures such as sloping or shoring. Excavation recommendations are provided
in the Temporary Excavations section of this report (see Section 7.10).
7.2.4 The upper five feet of existing site soils encountered during the investigation are considered
to have a “medium” expansive potential (EI = 61) and are classified as “expansive” in
accordance with the 2022 California Building Code (CBC) Section 1803.5.3. The
recommendations presented herein assume that foundations and slabs will derive support
in these materials.
7.3 Minimum Resistivity, pH, and Water-Soluble Sulfate
7.3.1 Potential of Hydrogen (pH) and resistivity testing as well as chloride content testing
were performed on representative samples of soil to generally evaluate the corrosion
potential to surface utilities. The tests were performed in accordance with California Test
Method Nos. 643 and 422 and indicate that the soils are considered “corrosive” with respect
to corrosion of buried ferrous metals on site. The results are presented in Appendix B (Figure
B21) and should be considered for design of underground structures. Due to the corrosive
potential of the soils, it is recommended that PVC, ABS or other approved plastic piping be
utilized in lieu of cast-iron when in direct contact with the site soils.
7.3.2 Laboratory tests were performed on representative samples of the on-site soil to measure
the percentage of water-soluble sulfate content. Results from the laboratory water-soluble
sulfate tests are presented in Appendix B (Figure B21) and indicate that the on-site soil
possess a sulfate exposure class of “S0” to concrete structures as defined by 2022 CBC Section
1904 and ACI 318-19 Chapter 19.
7.3.3 Geocon West, Inc. does not practice in the field of corrosion engineering and mitigation.
If corrosion sensitive improvements are planned, it is recommended that a corrosion
engineer be retained to evaluate corrosion test results and incorporate the necessary
precautions to avoid premature corrosion of buried metal pipes and concrete structures in
direct contact with the soils.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 18 - April 23, 2024
7.4 Grading
7.4.1 Grading is anticipated to include excavation of site soils for proposed foundations, slabs, and
utility trenches, as well as placement of backfill for utility trenches.
7.4.2 A preconstruction conference should be held at the site prior to the beginning of excavation
operations with the owner, contractor, civil engineer, geotechnical engineer, and building
official in attendance. Special soil handling requirements can be discussed at that time.
7.4.3 Earthwork should be observed, and compacted fill tested by representatives of Geocon West,
Inc. The existing fill and alluvial soils encountered during exploration is suitable for
re-use as an engineered fill, provided any encountered oversize material (greater than 6
inches) and any encountered deleterious debris is removed.
7.4.4 Grading should commence with the removal of all existing improvements from the area to
be graded. Deleterious debris such as wood and root structures should be exported from the
site and should not be mixed with the fill soils. Asphalt and concrete should not be mixed
with the fill soils unless approved by the Geotechnical Engineer. All existing underground
improvements planned for removal should be completely excavated and the resulting
depressions properly backfilled in accordance with the procedures described herein. Once a
clean excavation bottom has been established it must be observed and approved in writing
by the Geotechnical Engineer (a representative of Geocon West, Inc.).
7.4.5 Foundations should derive support in the undisturbed alluvial soils found at and below a
depth of 5 feet. The presence of existing artificial fill in proposed foundation excavations
must be field verified by Geocon during construction activities. Foundations should be
deepened as necessary to penetrate through the existing artificial fill at the direction of the
Geotechnical Engineer.
7.4.6 Performing open excavations adjacent to and deeper than existing foundations could
potentially remove lateral support and/or undermine the existing foundations and are not
acceptable. Excavation for grading and/or construction of new foundations adjacent to
existing foundations will require special excavation measures. Recommendations for
temporary excavations are provided in Section 7.10.
7.4.7 Where new concrete slab-on-grade is to be constructed, it is recommended that any soils
disturbed during construction activities be properly compacted for slab support.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 19 - April 23, 2024
7.4.8 All excavations must be observed and approved in writing by the Geotechnical Engineer (a
representative of Geocon).
7.4.9 All fill and backfill soils should be placed in horizontal loose layers approximately 6 to
8 inches thick, moisture conditioned to at least two percent above optimum moisture
content, and properly compacted to a minimum 90 percent of the maximum dry density in
accordance with ASTM D 1557 (latest edition).
7.4.10 The soils expected to be exposed during proposed excavations at the site are currently moist
and the grading contractor should be aware that the existing soils are currently above
optimum moisture content. Conditions could change seasonally. If the soils are in excess of
3 percent above optimum moisture content at the time of construction, the soils will likely
require some spreading and drying activities in order to achieve proper compaction.
7.4.11 Although not anticipated for this project, all imported fill shall be observed, tested, and
approved by Geocon West, Inc. prior to bringing soil to the site. Import fill should consist of
the characteristics presented in the table below.
SUMMARY OF IMPORT FILL RECOMMENDATIONS
Soil Characteristic Values
Expansion Potential “Low” (Expansion Index of 50 or less)
Particle Size Maximum Dimension Less Than 6 Inches
Free of Debris
Corrosivity Less Detrimental Than Existing Onsite Soils
7.4.12. Where new paving is to be placed, it is recommended that all existing fill and soft
alluvial soils be excavated and properly compacted for paving support. As a minimum, the
upper 12 inches of soil should be scarified, moisture conditioned to at least two percent
above optimum moisture content, and compacted to at least 95 percent relative compaction,
as determined by ASTM Test Method D 1557 (latest edition). Paving recommendations are
provided in the Preliminary Pavement Recommendations section of this report (see Section
7.9).
7.4.13 Utility trenches should be properly backfilled in accordance with the following requirements.
The pipe should be bedded with clean sands (Sand Equivalent greater than 30) to a depth of
at least 1 foot over the pipe, and the bedding material must be inspected and approved in
writing by the Geotechnical Engineer (a representative of Geocon). The use of gravel is not
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 20 - April 23, 2024
acceptable unless used in conjunction with filter fabric to prevent the gravel from having
direct contact with soil. The remainder of the trench backfill may be derived from onsite soil
or approved import soil, compacted as necessary, until the required compaction is obtained.
The use of minimum 2-sack slurry as backfill is also acceptable. Prior to placing any bedding
materials or pipes, the excavation bottom must be observed and approved in writing by the
Geotechnical Engineer (a representative of Geocon).
7.4.14 All trench and foundation excavation bottoms must be observed and approved in writing by
the Geotechnical Engineer (a representative of Geocon), prior to placing bedding materials,
fill, steel, gravel, or concrete.
7.5 Existing Foundations
7.5.1 During the site investigation, two test pits were excavated to partially expose and obtain
foundation dimensions of the existing structure. The observed foundation dimensions are
depicted on Figures 3A and 3B. Foundations derive support in existing artificial fill.
7.5.2 Based on the laboratory direct shear testing of the supporting soils, estimated bearing
pressures are provided below for assumed minimum foundation dimensions.
7.5.3 Continuous footings with minimum dimensions of 12 inches in width, 18 inches in depth
below the lowest adjacent grade, and bearing in artificial fill may be evaluated for an
allowable bearing capacity of 2,000 pounds per square foot (psf).
7.5.4 Isolated spread foundations with minimum dimensions of 24 inches in width, 18 inches in
depth below the lowest adjacent grade, and bearing in artificial fill may be evaluated for an
allowable bearing capacity of 2,500 psf.
7.5.5 The soil bearing pressure above may be increased by 150 psf and 300 psf for each additional
foot of foundation width and depth, respectively, up to a maximum allowable soil bearing
pressure of 4,000 psf. The allowable bearing pressure may be increased by up to one-third
for transient loads due to wind or seismic forces.
7.5.6 Additional bearing capacity may be feasible; however, increasing the bearing capacity
beyond the maximum allowable bearing capacity may induce additional settlement of the
existing foundations. The use of higher bearing capacities will require coordination with
the structural engineer and will be based on the structural tolerance for allowable total and
differential settlements. The allowable bearing pressure may be increased by one-third for
transient loads due to wind or seismic forces.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 21 - April 23, 2024
7.5.7 The project structural engineer should evaluate the existing foundations, existing loads, and
proposed building loads. Where excess capacity remains, the existing foundations may be
utilized for support of the proposed improvements. However, adding heavier loads to
existing foundations could induce settlements on the existing foundations which could be
detrimental to existing structural connections. Once existing and proposed load
configurations become available, they should be provided to Geocon for additional
settlement analyses. The structural engineer should evaluate the anticipated load
configuration and resulting settlements, and determine the necessity for new foundations.
Recommendations for new foundations are provided in the following section. The project
structural engineer should verify the suitability and reinforcement design for all existing and
new footings.
7.6 New Foundation Design
7.6.1 Where new footings are required for support of the proposed improvements, conventional
foundations may be used. Foundations should derive support in the undisturbed alluvial soils
found at and below a depth of 5 feet. Foundations should be deepened as necessary to
penetrate through any unsuitable soils and derive support exclusively in the undisturbed
alluvial soils. The presence of existing artificial fill in proposed foundation excavations must
be field verified by Geocon during construction activities.
7.6.2 Proposed foundations that are situated immediately adjacent to the existing foundations
should be deepened as necessary to match the depth of the existing foundation to prevent
a surcharge on the existing foundation.
7.6.3 Where proposed foundations will be deeper than the existing foundation, the proposed
foundation must be designed to resist the surcharge imposed by the existing foundation.
The surcharge area may be defined by a 1:1 projection up and away from the bottom of an
existing foundation.
7.6.4 The enclosed seismically induced settlement analyses indicate that the site soils could be
susceptible up to approximately ½ inch of total settlement as a result of the Design
Earthquake peak ground acceleration (⅔PGAM). The resulting differential settlement is
anticipated to be less than ¼ inch over a distance of 30 feet. These settlements are in addition
to the static settlements indicated and must be considered in the structural design.
7.6.5 In order to minimize settlements to less than ½ inch between existing and proposed
foundations, a reduced bearing capacity is being recommended. Continuous and isolated
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 22 - April 23, 2024
spread footings may be designed for an allowable bearing capacity of 2,500 pounds per
square foot (psf). Continuous footings should be a minimum of 12 inches in width, 24 inches
in depth below the lowest adjacent grade, and 12 inches into the recommended bearing
materials. Isolated spread foundations should be a minimum of 24 inches in width, 24 inches
in depth below the lowest adjacent grade, and 12 inches into the recommended bearing
materials. The maximum allowable soil bearing pressure should be limited to 2,500 psf to
reduce induced settlements to less than ½ inch.
7.6.6 Based on seismic considerations, the proposed improvements should be designed for a
combined static and seismically-induced differential settlement of ¾ inch over a distance of
30 feet.
7.6.7 Once the design and foundation loading configurations for the proposed structures proceeds
to a more finalized plan, the estimated settlements presented in this report should be
reviewed and revised, if necessary. If the final foundation loading configurations are greater
than the assumed loading conditions, the potential for settlement should be reevaluated by
this office.
7.6.8 The allowable bearing pressures may be increased by one-third for transient loads due to
wind or seismic forces.
7.6.9 Continuous footings should be reinforced with a minimum of four No. 4 steel reinforcing bars,
two placed near the top of the footing and two near the bottom. The reinforcement for
isolated spread footings should be designed by the project structural engineer.
7.6.10 The above foundation dimensions and minimum reinforcement recommendations are based
on soil conditions and building code requirements only, and are not intended to be used in
lieu of those required for structural purposes.
7.6.11 Due to the expansive potential of the anticipated subgrade soils, the moisture content of the
slab subgrade should be maintained at approximately 2 percent above optimum moisture
content at the time of concrete placement and should sprinkled as necessary to maintain a
moist condition. Furthermore, consideration should be given to doweling slabs into adjacent
curbs and foundations to minimize movements and offsets which could lead to a potential
tripping hazard.
7.6.12 Foundation excavations should be observed and approved in writing by the Geotechnical
Engineer (a representative of Geocon West, Inc.), prior to the placement of reinforcing steel
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 23 - April 23, 2024
and concrete to verify that the excavations and exposed soil conditions are consistent with
those anticipated. If unanticipated soil conditions are encountered, foundation modifications
may be required.
7.6.13 This office should be provided with a copy of the final construction plans so that the
excavation recommendations presented herein could be properly reviewed and revised if
necessary.
7.7 Lateral Design
7.7.1 Resistance to lateral loading may be provided by friction acting at the base of foundations,
slabs and by passive earth pressure. An allowable coefficient of friction of 0.3 may be used
with the dead load forces in the newly placed engineered fill or undisturbed alluvial soils.
7.7.2 Passive earth pressure for the sides of foundations and slabs poured against newly placed
engineered fill or undisturbed alluvial soils may be computed as an equivalent
fluid having a density of 200 pounds per cubic foot (pcf) with a maximum earth pressure of
2,000 psf. When combining passive and friction for lateral resistance, the passive component
should be reduced by one-third. A one-third increase in the passive value may be used for
wind or seismic loads.
7.8 Concrete Slabs-on-Grade
7.8.1 Exterior concrete slabs-on-grade subject to vehicle loading should be designed in accordance
with the recommendations in the Preliminary Pavement Recommendations section of this
report (Section 7.9).
7.8.2 Unless specifically evaluated and designed by a qualified structural engineer, concrete slabs-
on-grade for structures, not subject to vehicle loading, should be a minimum of 4 inches thick
and minimum slab reinforcement should consist of No. 3 steel reinforcing bars placed 18
inches on center in both horizontal directions. Steel reinforcing should be positioned
vertically near the slab midpoint. It is recommended that any soils disturbed during
construction activities be properly compacted for slab support. The finished subgrade must
observed and be approved in writing prior to placement of a vapor retarder, reinforcing steel,
or concrete.
7.8.3 Slabs-on-grade at the ground surface that may receive moisture-sensitive floor coverings or
may be used to store moisture-sensitive materials should be underlain by a vapor retarder
placed directly beneath the slab. The vapor retarder and acceptable permeance should be
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 24 - April 23, 2024
specified by the project architect or developer based on the type of floor covering that will
be installed. The vapor retarder selection and design should be consistent with the guidelines
presented in Section 9.3 of the American Concrete Institute’s (ACI) Guide for Concrete Slabs
that Receive Moisture-Sensitive Flooring Materials (ACI 302.2R-06) as well as ASTM E1745
and should be installed in general conformance with ASTM E 1643 (latest edition) and the
manufacturer’s recommendations. A minimum thickness of 15 mils extruded polyolefin
plastic is recommended; vapor retarders which contain recycled content or woven materials
are not recommended. The vapor retarder should have a permeance of less than 0.01 perms
demonstrated by testing before and after mandatory conditioning. The vapor retarder should
be installed in direct contact with the concrete slab with proper perimeter seal. If the
California Green Building Code requirements apply to this project, the vapor retarder should
be underlain by 4 inches of clean aggregate. It is important that the vapor retarder be
puncture resistant since it will be in direct contact with angular gravel. As an alternative to
the clean aggregate suggested in the Green Building Code, it is our opinion that the concrete
slab-on-grade may be underlain by a vapor retarder over 4-inches of clean sand (sand
equivalent greater than 30), since the sand will serve a capillary break and will minimize the
potential for punctures and damage to the vapor barrier.
7.8.4 For seismic design purposes, a coefficient of friction of 0.3 may be utilized between concrete
slabs and subgrade soils without a moisture barrier, and 0.15 for slabs underlain by a
moisture barrier.
7.8.5 Exterior slabs for walkways and flatwork, not subject to traffic loads, should be at least
4 inches thick and reinforced with No. 3 steel reinforcing bars placed 18 inches on center in
both horizontal directions, positioned near the slab midpoint. Prior to construction of slabs,
the upper 12 inches of subgrade should be moistened to at least two percent above optimum
moisture content and properly compacted to at least 95 percent relative compaction, as
determined by ASTM Test Method D 1557 (latest edition). Crack control joints should be
spaced at intervals not greater than 10 feet and should be constructed using saw-cuts or
other methods as soon as practical following concrete placement. Crack control joints should
extend a minimum depth of one-fourth the slab thickness. Construction joints should be
designed by the project structural engineer.
7.8.6 The moisture content of the slab subgrade should be maintained and sprinkled as necessary
to maintain a moist condition as would be expected in any concrete placement.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 25 - April 23, 2024
7.8.7 The recommendations of this report are intended to reduce the potential for cracking of slabs
due to settlement. However, even with the incorporation of the recommendations presented
herein, foundations, stucco walls, and slabs-on-grade may exhibit some cracking due to
minor soil movement and/or concrete shrinkage. The occurrence of concrete shrinkage
cracks is independent of the supporting soil characteristics. Their occurrence may be reduced
and/or controlled by limiting the slump of the concrete, proper concrete placement and
curing, and by the placement of crack control joints at periodic intervals, in particular, where
re-entrant slab corners occur.
7.9 Preliminary Pavement Recommendations
7.9.1 Where new paving is to be placed, it is recommended that all existing fill and soft alluvial soils
be excavated and properly compacted for paving support. The client should be aware that
excavation and compaction of all existing artificial fill and soft alluvial soils in the area of new
paving is not required; however, paving constructed over existing uncertified fill or unsuitable
alluvium material may experience increased settlement and/or cracking, and may therefore
have a shorter design life and increased maintenance costs. As a minimum, the upper 12
inches of paving subgrade should be scarified, moisture conditioned to at least 2 percent
above optimum moisture content, and properly compacted to at least 95 percent relative
compaction, as determined by ASTM Test Method D 1557 (latest edition).
7.9.2 The following pavement sections are based on an assumed R-Value of 20. Once site grading
activities are complete an R-Value should be obtained by laboratory testing to confirm the
properties of the soils serving as paving subgrade, prior to placing pavement.
7.9.3 The Traffic Indices listed below are estimates. Geocon does not practice in the field of traffic
engineering. The actual Traffic Index for each area should be determined by the project civil
engineer. If pavement sections for Traffic Indices other than those listed below are required,
Geocon should be contacted to provide additional recommendations. Pavement thicknesses
were determined following procedures outlined in the California Highway Design Manual
(Caltrans). It is anticipated that the majority of traffic will consist of automobile and large
truck traffic.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 26 - April 23, 2024
PRELIMINARY PAVEMENT DESIGN SECTIONS
Location Estimated Traffic
Index (TI)
Asphalt Concrete
(inches)
Class 2 Aggregate
Base (inches)
Automobile Parking
and Driveways 4.0 3.0 4.0
Fire Lanes 7.0 4.0 12.0
7.9.4 Asphalt concrete should conform to Section 203-6 of the “Standard Specifications for Public
Works Construction” (Green Book). Class 2 aggregate base materials should conform to
Section 26-1.02A of the “Standard Specifications of the State of California, Department of
Transportation” (Caltrans). The use of Crushed Miscellaneous Base (CMB) in lieu of Class 2
aggregate base is acceptable. Crushed Miscellaneous Base should conform to Section
200-2.4 of the “Standard Specifications for Public Works Construction” (Green Book).
7.9.5 Unless specifically designed and evaluated by the project structural engineer, where exterior
concrete paving will be utilized for support of vehicles, it is recommended that the concrete
be a minimum of 6 inches of concrete reinforced with No. 4 steel reinforcing bars placed
16 inches on center in both horizontal directions. Concrete paving supporting vehicular traffic
should be underlain by a minimum of 4 inches of aggregate base and a properly compacted
subgrade. The subgrade and base material should be compacted to 95 percent relative
compaction as determined by ASTM Test Method D 1557 (latest edition).
7.9.6 The performance of pavements is highly dependent upon providing positive surface drainage
away from the edge of pavements. Ponding of water on or adjacent to the pavement will
likely result in saturation of the subgrade materials and subsequent cracking, subsidence and
pavement distress. If planters are planned adjacent to paving, it is recommended that the
perimeter curb be extended at least 12 inches below the bottom of the aggregate base to
minimize the introduction of water beneath the paving.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 27 - April 23, 2024
7.10 Temporary Excavations
7.10.1 Excavations up to 7 feet in height may be required for excavation and construction of the
proposed improvements. The excavations are expected to expose artificial fill and alluvial
soils, which are suitable for vertical excavations up to 5 feet in height where loose soils or
caving sands are not present, and where not surcharged by adjacent traffic or structures.
7.10.2 Vertical excavations greater than 5 feet or where surcharged by existing structures will
require sloping or shoring measures in order to provide a stable excavation. Where sufficient
space is available, temporary unsurcharged embankments could be sloped back at a uniform
1:1 slope gradient or flatter up to a maximum of 8 feet in height. A uniform slope does not
have a vertical portion. Where space is limited, special excavation measures will be required.
7.10.3 Continuous vertical excavations in close proximity to an adjacent structure could remove
vertical and lateral support from the existing improvements and are not recommended. Special
excavations measures such as trench shoring will be required where the proposed excavation
will be deeper than an existing adjacent foundation or adjacent to a property line.
Recommendations for trench shoring are provided in the following section.
7.10.4 Where temporary construction slopes are utilized, the top of the slope should be barricaded
to prevent vehicles and storage loads at the top of the slope within a horizontal distance
equal to the height of the slope. If the temporary construction slopes are to be maintained
during the rainy season, berms are suggested along the tops of the slopes where necessary
to prevent runoff water from entering the excavation and eroding the slope faces. The soils
exposed in the cut slopes should be inspected during excavation by our personnel and the
contractor’s competent person so that modifications of the slopes can be made if variations
in the soil conditions occur. All excavations should be stabilized within 30 days of initial
excavation.
7.11 Trench Shoring
7.11.1 To protect the existing footings, hydraulic trench shoring may be implemented where
excavations will extend below existing foundations.
7.11.2 Excavation may be conducted adjacent to a foundation but should not extend below the
foundation until the shoring is installed. Once shoring is installed the excavation can be
completed. Once the concrete is placed to an elevation that is slightly above the bottom of
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 28 - April 23, 2024
the existing adjacent foundation, the shoring may be removed, and the new foundation
constructed. See illustration below.
Saw-cut Slab
&
Excavate
Place
Hydraulic
Shoring
Complete
Excavation
Below
Foundation
Place
Concrete
Remove Shoring
&
Construct
Foundation
1 2 3
4 5 6
7.11.3 It is recommended that an equivalent fluid pressure based on the table below be utilized for
design of hydraulic shoring.
HEIGHT OF SHORED
EXCAVATION
(FEET)
EQUIVALENT FLUID PRESSURE
(Pounds Per Cubic Foot)
(ACTIVE PRESSURE)
EQUIVALENT FLUID PRESSURE
(Pounds Per Cubic Foot)
(AT-REST PRESSURE)
Up to 7 25 67
7.11.4 It is very important to note that active pressures can only be achieved when movement in
the soil (earth wall) occurs. If movement in the soil is not acceptable, such as adjacent to an
existing structure, the at-rest pressure should be considered for design purposes.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 29 - April 23, 2024
7.11.5 A qualified engineer should be retained to review and prepare a shoring plan in accordance
with the shoring manufacture’s specifications.
7.11.6 Additional pressure should be added for a surcharge condition due to sloping ground,
vehicular traffic or adjacent structures and should be designed for each condition as the
project progresses.
7.11.7 It is recommended that line-load surcharges from adjacent wall footings, use horizontal
pressures generated from NAV-FAC DM 7.2. The governing equations are:
𝐹𝐹𝐹𝐹𝐹𝐹 𝑥𝑥𝐻𝐻�≤0.4 𝜎𝜎𝐻𝐻(𝑧𝑧)=0.20 × �𝑧𝑧𝐻𝐻��0.16 +�𝑧𝑧𝐻𝐻�2 �2 × 𝑄𝑄𝐿𝐿𝐻𝐻
and 𝐹𝐹𝐹𝐹𝐹𝐹 𝑥𝑥𝐻𝐻�>0.4
𝜎𝜎𝐻𝐻(𝑧𝑧)=1.28 × �𝑥𝑥𝐻𝐻�2 × �𝑧𝑧𝐻𝐻���𝑥𝑥𝐻𝐻�2 +�𝑧𝑧𝐻𝐻�2�2 × 𝑄𝑄𝐿𝐿𝐻𝐻
where x is the distance from the face of the excavation or wall to the vertical line-load, H is
the distance from the bottom of the footing to the bottom of excavation or wall, z is the
depth at which the horizontal pressure is desired, QL is the vertical line-load and σH(z) is the
horizontal pressure at depth z.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 30 - April 23, 2024
7.11.8 It is recommended that vertical point-loads, from construction equipment outriggers or
adjacent building columns use horizontal pressures generated from NAV-FAC DM 7.2.
The governing equations are:
𝐹𝐹𝐹𝐹𝐹𝐹 𝑥𝑥𝐻𝐻�≤0.4 𝜎𝜎𝐻𝐻(𝑧𝑧)=0.28 × �𝑧𝑧𝐻𝐻�2
�0.16 +�𝑧𝑧𝐻𝐻�2 �3 × 𝑄𝑄𝑃𝑃𝐻𝐻2
and 𝐹𝐹𝐹𝐹𝐹𝐹 𝑥𝑥𝐻𝐻�>0.4
𝜎𝜎𝐻𝐻(𝑧𝑧)=1.77 × �𝑥𝑥𝐻𝐻�2 × �𝑧𝑧𝐻𝐻�2
��𝑥𝑥𝐻𝐻�2 +�𝑧𝑧𝐻𝐻�2 �3 × 𝑄𝑄𝑃𝑃𝐻𝐻2
then 𝜎𝜎′𝐻𝐻 (𝑧𝑧)= 𝜎𝜎𝐻𝐻(𝑧𝑧)𝑐𝑐𝐹𝐹𝑐𝑐2 (1.1𝜃𝜃)
where x is the distance from the face of the excavation/wall to the vertical point-load, H is
distance from the outrigger/bottom of column footing to the bottom of excavation, z is the
depth at which the horizontal pressure is desired, Qp is the vertical point-load, σH(z) is the
horizontal pressure at depth z, ϴ is the angle between a line perpendicular to the
excavation/wall and a line from the point-load to location on the excavation/wall where the
surcharge is being evaluated, and σH(z) is the horizontal pressure at depth z.
7.12 Stormwater Infiltration
7.12.1 During the site exploration on March 4, 2024, borings B2 and B3 were utilized to perform
percolation testing. The borings were excavated to approximate depths of 5 and 25 feet
below ground surface. Slotted casing was placed in the borings, and the borings were then
filled with water to pre-saturate the soils. On March 5, 2024, the casings were refilled with
water and percolation test readings were performed after repeated flooding of the cased
excavation.
7.12.2 Based on the test results, the average infiltration rate (adjusted percolation rate) is provided
in the following table. The field-measured percolation rate has been adjusted to infiltration
rates in accordance with the County of Orange Technical Guidance Document for the
Preparation of Conceptual/Preliminary and/or Project Water Quality Management Plans
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 31 - April 23, 2024
(December 2013). Additional correction factors may be required and should be applied by
the engineer in responsible charge of the design of the stormwater infiltration system and
based on applicable guidelines. Percolation test results are provided on Figures 19 and 20.
Boring Soil Type Infiltration Depth (ft) Average Infiltration
Rate (in / hour)
B2 Sandy Silt (ML) 15 – 25 0.02
B3 Sandy Clay (CL) 2.5 – 5 3.78
7.12.3 The results of the percolation testing indicate that the soils at B3 are conducive to infiltration.
It is our opinion that the soil zones encountered at the depths and location of boring B3 as
listed in the table above are suitable for infiltration of stormwater.
7.12.4 It is our opinion that the introduction of stormwater at the depth and location indicated
above will not induce excessive hydro-consolidation (see Figures B7 through B15), will not
create a perched groundwater condition, will not affect soil structure interaction of existing
or proposed foundations due to expansive soils, will not saturate soils supported by existing
or proposed retaining walls, and will not increase the potential for liquefaction. Resulting
settlements are anticipated to be less than ¼ inch, if any.
7.12.5 Where infiltration systems will be utilized, it is recommended that a minimum 10-foot
horizontal and vertical setback be maintained from existing or proposed foundations.
Additional setbacks may be required by the governing jurisdiction and should be
incorporated into the stormwater infiltration system design as necessary.
7.12.6 Subsequent to the placement of the infiltration system, it is acceptable to backfill the
resulting void space between the excavation sidewalls and the infiltration system with
minimum two-sack slurry provided the slurry is not placed in the infiltration zone. It is
recommended that pea gravel be utilized adjacent to the infiltration zone so communication
of water to the soil is not hindered.
7.12.7 Due to the preliminary nature of the project at this time, the type of stormwater infiltration
system and location of the stormwater infiltration systems has not yet been determined. The
design drawings should be reviewed and approved by the Geotechnical Engineer. The
installation of the stormwater infiltration system should be observed and approved by the
Geotechnical Engineer (a representative of Geocon).
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 - 32 - April 23, 2024
7.13 Surface Drainage
7.13.1 Proper surface drainage is critical to the future performance of the project. Uncontrolled
infiltration of irrigation excess and storm runoff into the soils can adversely affect the
performance of the planned improvements. Saturation of a soil can cause it to lose internal
shear strength and increase its compressibility, resulting in a change in the original designed
engineering properties. Proper drainage should be maintained at all times.
7.13.2 All site drainage should be collected and controlled in non-erosive drainage devices. Drainage
should not be allowed to pond anywhere on the site, and especially not against any
foundation or retaining wall. The site should be graded and maintained such that surface
drainage is directed away from structures in accordance with 2022 CBC 1804.4 or other
applicable standards. In addition, drainage should not be allowed to flow uncontrolled over
any descending slope. Discharge from downspouts, roof drains and scuppers are not
recommended onto unprotected soils within 5 feet of the building perimeter. Planters which
are located adjacent to foundations should be sealed to prevent moisture intrusion into the
soils providing foundation support. Landscape irrigation is not recommended within 5 feet of
the building perimeter footings except when enclosed in protected planters.
7.13.3 Positive site drainage should be provided away from structures, pavement, and the tops of
slopes to swales or other controlled drainage structures. Pavement areas should be fine
graded such that water is not allowed to pond.
7.13.4 Landscaping planters immediately adjacent to paved areas are not recommended due to the
potential for surface or irrigation water to infiltrate the pavement's subgrade and base
course. Either a subdrain, which collects excess irrigation water and transmits it to drainage
structures, or impervious above-grade planter boxes should be used. In addition, where
landscaping is planned adjacent to the pavement, it is recommended that consideration be
given to providing a cutoff wall along the edge of the pavement that extends at least
12 inches below the base material.
7.14 Plan Review
7.14.1 Grading, foundation, and shoring plans should be reviewed by the Geotechnical Engineer
(a representative of Geocon West, Inc.), prior to finalization to verify that the plans have been
prepared in substantial conformance with the recommendations of this report and to provide
additional analyses or recommendations.
625 Cypress Avenue
Limited Geotechnical Investigation
Project No. W1895-88-01 April 23, 2024
LIMITATIONS AND UNIFORMITY OF CONDITIONS
1. The firm that performed the geotechnical investigation for the project should be retained to
provide testing and observation services during construction to provide continuity of
geotechnical interpretation and to check that the recommendations presented for
geotechnical aspects of site development are incorporated during site grading, construction of
improvements, and excavation of foundations. If another geotechnical firm is selected to
perform the testing and observation services during construction operations, that firm should
prepare a letter indicating their intent to assume the responsibilities of project geotechnical
engineer of record. A copy of the letter should be provided to the regulatory agency for their
records. In addition, that firm should provide revised recommendations concerning the
geotechnical aspects of the proposed development, or a written acknowledgement of their
concurrence with the recommendations presented in our report. They should also perform
additional analyses deemed necessary to assume the role of Geotechnical Engineer of Record.
2. The recommendations of this report pertain only to the site investigated and are based upon
the assumption that the soil conditions do not deviate from those disclosed in the investigation.
If any variations or undesirable conditions are encountered during construction, or if the
proposed construction will differ from that anticipated herein, Geocon Incorporated should be
notified so that supplemental recommendations can be given. The evaluation or identification
of the potential presence of hazardous or corrosive materials was not part of the scope of
services provided by Geocon Incorporated.
3. This report is issued with the understanding that it is the responsibility of the owner or his
representative to ensure that the information and recommendations contained herein are
brought to the attention of the architect and engineer for the project and incorporated into
the plans, and the necessary steps are taken to see that the contractor and subcontractors
carry out such recommendations in the field.
4. The findings of this report are valid as of the date of this report. However, changes in the
conditions of a property can occur with the passage of time, whether they be due to natural
processes or the works of man on this or adjacent properties. In addition, changes in applicable
or appropriate standards may occur, whether they result from legislation or the broadening of
knowledge. Accordingly, the findings of this report may be invalidated wholly or partially by
changes outside our control. Therefore, this report is subject to review and should not be relied
upon after a period of three years.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 April 23, 2024
LIST OF REFERENCES
1. Abrahamson, N.A, Silva, W.J, and Kamai, R., 2014, Summary of the ASK14 Ground Motion Relation
for Active Crustal Regions, Earthquake Spectra, Volume 30, No. 3, pages 1025-1055, August 2014.
2. Boore, D.M., Stewart, J.P., Seyhan, E., and Atkinson, G.M., 2014, NGA-West2 Equations for
Predicting PGA, PGV, and 5% Damped PSA for Shallow Crustal Earthquakes, Earthquake
Spectra, Volume 30, No. 3, pages 1057-1085, August 2014.
3. California Department of Water Resources, 1967, Progress Report on Groundwater Geology of
the Coastal Plain of Orange County.
4. California Division of Mines and Geology, 2001; State of California Seismic Hazard Zones, Tustin
Quadrangle, Official Map Released January 17, 2001.
5. California Geologic Energy Management Division, 2024, Geologic Energy Management Division
Well Finder, http://maps.conservation.ca.gov.calgem/index.html#close.
6. California Department of Conservation, Division of Mines and Geology, 2001, Seismic Hazard
Evaluation of the Tustin 7.5-Minute Quadrangle, Orange County, California, Open File Report
97-20.
7. California Division of Mines and Geology, 1981, Geologic Map of Orange County, California
Showing Mines and Mineral Deposits, Bulletin 204.
8. California Geological Survey, 2024a, CGS Information Warehouse, Regulatory Map Portal,
http://maps.conservation.ca.gov/cgs/informationwarehouse/index.html?map=regulatoryma
ps.
9. California Geological Survey, 2024b, Earthquake Zones of Required Investigation,
http://maps.conservation.ca.gov.doggr/index.html#close.
10. California Geological Survey, 2018, Earthquake Fault Zones, A Guide for Government Agencies,
Property Owners/Developers, and Geoscience Practitioners for Assessing Fault Rupture
Hazards in California, Special Publication 42, Revised 2018.
11. California Geologic Survey, 2012, Geologic Compilation of Quaternary Surficial Deposits in
Southern California, Santa Ana 30’ X 60’ Quadrangle, A Project for the Department of Water
Resources by the California Geological Survey, Compiled from existing sources by Trinda L.
Bedrossian, CEG and Peter D. Roffers, CGS Special Report 217, Plate 16, Scale 1:100,000.
12. Campbell, K.W. and Bozorgnia, Y., 2014, NGA-West2 Ground Motion Model for the Average
Horizontal Components of PGA, PGV, and 5% Damped Linear Acceleration Response Spectra,
Earthquake Spectra, Volume 30, No. 3, pages 1087-1115, August 2014.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 April 23, 2024
LIST OF REFERENCES (CONTINUED)
13. Chiou, B. S.-J., and Youngs, R.R., 2014, Update of the Chiou and Youngs NGA Model for the
Average Horizontal Component of Peak Ground Motion and Response Spectra, Earthquake
Spectra, Volume 30, No. 3, pages 1117-1153, August 2014.
14. FEMA, 2024, Online Flood Hazard Maps, http://www.esri.com/hazards/index.html.
15. Geocon West, Inc., 2018, Geotechnical Investigation, Proposed Mixed-Use Development, East
4th Street and Mortimer Street, Santa Ana, California, dated July 26, 2018
16. OpenSha, Site Data Application, Version 1.5.2, http://opensha.org/apps, accessed April 2024.
17. Orange County General Plan, 2004, Safety Element, Advance Planning Program, Environmental
Management Agency.
18. Orange County, Technical Guidance Document (TGD) For The Preparation Of
Conceptual/Preliminary And/Or Project Water Quality Management Plans (WQMPs),
December 20, 2013.
19. OSHPD Seismic Design Maps Web Application, https://seismicmaps.org/, accessed April 2024.
20. Powers, P.M., Clayton, B.S., and Altekruse, J.M., 2022, nshmp-haz: National Seismic Hazard
Model Project hazard applications and web services. U.S. Geological Survey software release,
doi: 10.5066/P9STF5GK. Santa Ana, City of, 1982, Revised 2010, Seismic Safety Element, City of
Santa Ana General Plan.
21. Shahi, S.K., Baker, J.W., 2013, NGA-West2 Models for Ground-Motion Directionality, Pacific
Earthquake Engineering Research Center, PEER 2013/10.
22. Shahi, S.K., Baker, J.W., 2014, NGA-West2 Models for Ground-Motion Directionality,
Earthquake Spectra, Volume 30, Issue 3, pages 1285-1300, August 2014.
23. Toppozada, T. R., Bennett, J. H., Borchardt, G. A., Saul, R., and Davis, J .F., 1988, Planning
Scenario for a Major Earthquake on the Newport–Inglewood Fault Zone, California Division of
Mines and Geology Special Publication 99.
24. USGS, BSSC2014 (Scenario Catalog),
https://earthquake.usgs.gov/scenarios/catalog/bssc2014/, accessed April 2024.
25. USGS, NSHMP_HAZ Response Spectral Application, https://earthquake.usgs.gov/nshmp-haz-
ws/apps/spectra-plot.html/, accessed April 2024.
26. USGS, Unified Hazard Tool, https://earthquake.usgs.gov/hazards/interactive/, accessed April
2024.
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 April 23, 2024
LIST OF REFERENCES (CONTINUED)
27. Ziony, J.I., and Jones, L.M., 1989, Map Showing Late Quaternary Faults and 1978–1984
Seismicity of the Los Angeles Region, California, U.S. Geological Survey Miscellaneous Field
Studies Map MF-1964.
REFERENCE: U.S.G.S. TOPOGRAPHIC MAPS, 7.5 MINUTE SERIES, TUSTIN, CA QUADRANGLE
FIG. 1
VICINITY MAP
PHONE (949) 491-6570 - FAX (949) 299-4550
2807 MCGAW BOULEVARD - IRVINE, CA 92618
ENVIRONMENTAL GEOTECHNICAL MATERIALS
CHECKED BY: GAKDRAFTED BY: RA PROJECT NO. W1895-88-01APRIL 2024
625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
SITE
ENVIRONMENTAL GEOTECHNICAL MATERIALS
CHECKED BY: PZDRAFTED BY: ACS
PROJECT NO. W1895-88-01
SITE PLAN
APRIL 2024 FIG. 2
SANTA ANA, CALIFORNIA
625 CYPRESS AVENUE
PHONE (949) 491-6570 - FAX (949) 299-4550
2807 MCGAW BOULEVARD - IRVINE, CA 92618
0 40'20'
NORTH
LEGEND
Approximate Location of Boring
B3
CY
P
R
E
S
S
A
V
E
N
U
E
Approximate Limits of Proposed Project
Approximate Location of Test Pit
TP2
AL
L
E
Y
TP1
TP2
B1
B2
B2A
B3
6.5"
9.75"9.5"
13.5"
22.25"
9.75"
13.5"
13.5"
13.5"
1"
TEST PIT 1 SECTION
SANTA ANA, CALIFORNIA
PROJECT NO. W1895-88-01APRIL 2024 FIG. 3A
PHONE (949) 491-6570 - FAX (949) 299-4550
2807 MCGAW BOULEVARD - IRVINE, CA 92618
ENVIRONMENTAL GEOTECHNICAL MATERIALS
CHECKED BY: JTADRAFTED BY: ACS
625 CYPRESS AVENUE
SLAB ON GRADE
ALLUVIUM
ARTIFICIAL FILL
* TEST PIT SECTIONS ARE NOT TO SCALE AND ARE FOR ILLUSTRATION PURPOSES ONLY.
VIEW FACING NORTH VIEW FACING WEST
?
?
?
?
5"
17.5"
7.5"
5"
17.5"
6"6"
TEST PIT 2 SECTION
SANTA ANA, CALIFORNIA
PROJECT NO. W1895-88-01APRIL 2024 FIG. 3B
PHONE (949) 491-6570 - FAX (949) 299-4550
2807 MCGAW BOULEVARD - IRVINE, CA 92618
ENVIRONMENTAL GEOTECHNICAL MATERIALS
CHECKED BY: JTADRAFTED BY: ACS
625 CYPRESS AVENUE
ALLUVIUM
ARTIFICIAL FILL
WALL
SLAB
* TEST PIT SECTIONS ARE NOT TO SCALE AND ARE FOR ILLUSTRATION PURPOSES ONLY.
VIEW FACING EAST VIEW FACING NORTH
SLAB ON GRADE
?
?
?
SITE
0 12 24 Miles
Reference: Jennings, C.W. and Bryant, W. A., 2010, Fault Activity Map of California, California Geological Survey Geologic Data Map No. 6.
REGIONAL FAULT MAP
PROJECT NO. W1895-88-01APRIL 2024 FIG. 4
PHONE (949) 491-6570 - FAX (949) 299-4550
2807 MCGAW BOULEVARD - IRVINE, CA 92618
ENVIRONMENTAL GEOTECHNICAL MATERIALS
CHECKED BY: GAKDRAFTED BY: RA
625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
SITE
DRAFTED BY: RA CHECKED BY: GAK
PHONE (949) 491-6570 - FAX (949) 299-4550
2807 MCGAW BOULEVARD - IRVINE, CA 92618
ENVIRONMENTAL GEOTECHNICAL MATERIALS
REGIONAL SEISMICITY MAP
FIG. 5
0 20 40 Miles
Reference: Toppozada, T., Branum, D., Petersen, M., Hallstrom, C., Cramer, C., and Reichle, M., 2000,
Epicenters and Areas Damaged by M>5 California Earthquakes, 1800 - 1999, California
Geological Survey, Map Sheet 49.
SANTA ANA, CALIFORNIA
PROJECT NO. W1895-06-01APRIL 2024
625 CYPRESS AVENUE
Project No.: W1895-88-01
DESIGN RESPONSE SPECTRUM 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
0.01
0.1
1
10
0.01 0.1 1 10
Sp
e
c
t
r
a
l
A
c
c
e
l
e
r
a
t
i
o
n
,
g
'
s
Period, s
Deterministic Scenario 1: San Joaquin Hills
Deterministic Scenario 2: Compton
Deterministic Scenario 3: Newport-Inglewood alt 2
Deterministic Scenario 4: Newport-Inglewood alt 1
Deterministic Scenario 5: Whittier alt 2
0.1
1
10
0.01 0.1 1 10
Sp
e
c
t
r
a
l
A
c
c
e
l
e
r
a
t
i
o
n
,
g
'
s
Period, s
Maximum Rotated Component, Risk-Targeted MCER
Probabilistic, Risk-Targeted MCER
Probabilistic, Uniform-Hazard MCE
Project No.: W1895-88-01
DESIGN RESPONSE SPECTRUM 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
0.1
1
10
0.01 0.1 1 10
Sp
e
c
t
r
a
l
A
c
c
e
l
e
r
a
t
i
o
n
,
g
'
s
Period, s
Maximum Rotated Component, Risk-Targeted MCER
84th Percentile, Maximum Rotated Component Deterministic
Spectrum
0.1
1
10
0.01 0.1 1 10
Sp
e
c
t
r
a
l
A
c
c
e
l
e
r
a
t
i
o
n
,
g
'
s
Period, s
Site-Specific, MCE Response Spectrum
Site-Specific, Design Response Spectrum
80% modified General Response Spectrum
SM =
SM1 = g
SD =
Spectral acceleration values reported in units of "g". "--" Indicates that spectral period was not used at that calculation step
Project No.: W1895-88-01
0.1965.0 0.172 0.156 0.906 1.26 0.196 0.216 0.131 0.123
1.954
0.792
0.584
0.687
0.321
0.344
0.390
0.448
0.506
0.621
0.687
0.687
0.6872.162
2.342
0.500
0.513
0.589
0.744
0.889
1.002
1.196
1.160
0.924
1.277
1.22
0.750
0.770
0.883
1.115
1.334
1.635
--
1.812
1.915
1.954
1.208
1.090
1.303
Risk Factor,
Cr
0.967
0.972
Maximum-
Rotated
Component
Scale Factor
1.19
1.652
0.631
0.647
0.742
0.937
0.649
0.668
0.760
0.964
1.139
1.380
1.121
1.362
--
1.497
1.570
1.602
0.02
Spectral
Period
(seconds)
0.01
Probabilistic
Uniform-
Hazard
0.651
Risk-
Targeted,
Probabilistic
--
1.525
1.606
0.629
0.30
0.20
0.25
0.15
0.18
0.08
0.10
0.03
0.05
DESIGN RESPONSE SPECTRUM 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
0.977
0.970
1.19
1.19
1.19
1.19
1.19
1.20
0.968
0.977
0.972
0.984
0.987
--
0.982
--
1.21
1.22
MRC, Risk-
Targeted
Probabilistic
0.749
84th
Percentile,
Deterministic
0.923
0.924
1.812
1.915
Site-Specific
Maximum
Considered
Earthquake
0.749
0.750
0.770
0.883
1.115
1.334
1.635
1.740
Site-Specific
Design
Earthquake
0.499
General
Response
Spectrum
0.298
1.387
1.691
--
1.932
1.759
1.188
1.172
0.792
0.40
0.50
0.75
0.89
1.0
1.5
2.0
3.0
4.0
1.612
1.523
1.221
--
1.002
0.692
0.512
0.324
0.228
1.542
1.441
1.148
--
0.934
0.639
0.471
0.297
0.208
0.957
0.947
0.940
--
0.932
0.923
0.919
0.916
0.911
1.23
1.23
1.24
--
1.24
1.24
1.24
1.25
1.26 0.262 0.312
1.264
1.182
0.949
0.837
0.772
0.528
0.389
1.896
1.773
1.424
--
1.158
0.372
2.484
2.421
2.010
--
1.662
1.135
0.831
0.492 0.248
0.175 0.153
1.896
1.773
1.424
1.256
1.158
0.792
0.584
0.372
0.262
0.687
0.687
0.687
0.687
0.613
0.409
0.307
0.204
Reference: ASCE 7-16 21.4 DESIGN ACCELERATION PARAMETERS
Where the site-specific procedure is used to determine the design ground motion in accordance with Section 21.3, the parameter SDS shall
be taken as 90% of the maximum spectral acceleration, Sa, obtained from the site-specific spectrum, at any period within the range from
0.2 to 5 s, inclusive. The parameter SD1 shall be taken as the maximum value of the product, TSa, for periods from 1 to 2 s for sites with
vs,30 > 1,200 ft/s (vs,30 > 365.76 m/s) and for periods from 1 to 5 s for sites with vs,30 ≤ 1,200 ft/=s (vs,30 ≤ 365.76 m/s). The parameters
SMS and SM1 shall be taken as 1.5 times SDS and SD1, respectively. The values so obtained shall not be less than 80% of the values determined
in accordance with Section 11.4.3 for SMS and SM1 and Section 11.4.5 for SDS and SD1.
Project No.: W1895-88-01
DESIGN RESPONSE SPECTRUM 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
0.1
1
10
0.01 0.1 1 10
Sp
e
c
t
r
a
l
A
c
c
e
l
e
r
a
t
i
o
n
,
g
'
s
Period, s
Site-Specific, BSE-2E Response Spectrum
80% modified General Response Spectrum
0.01
0.1
1
0.01 0.1 1 10
Sp
e
c
t
r
a
l
A
c
c
e
l
e
r
a
t
i
o
n
,
g
'
s
Period, s
Site-Specific, BSE-1E Response Spectrum
80% modified General Response Spectrum
BSE-2E
BSE-2E SX =
Project No.: W1895-88-01
Site-Specific
BSE-2E
Earthquake
0.000 --------
Spectral Period
(seconds)
Probabilistic
Uniform-
Hazard
Maximum-
Rotated
Component
Scale Factor
MRC,
Probabilistic
General
Response
Spectrum
0.020 0.492 1.190 0.585 0.430 0.585
0.010 0.491 1.190 0.584 0.388 0.584
0.050 0.577 1.190 0.687 0.555 0.687
0.030 0.504 1.190 0.599 0.472 0.599
0.100 0.871 1.190 1.037 0.763 1.037
0.075 0.728 1.190 0.866 0.659 0.866
0.150 1.064 1.200 1.277 0.864 1.277
0.124 ------0.864 1.159
1.524
0.250 1.226 1.220 1.496 0.864 1.496
0.200 1.170 1.210 1.416 0.864 1.416
1.371
0.905
DESIGN RESPONSE SPECTRUM 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Spectral acceleration values reported in units of "g"
"--" Indicates that spectral period was not used at that calculation step
0.621 ------0.864 1.215
--
0.500 1.115 1.230 1.371 0.864 1.371
0.400 1.195 1.230 1.470 0.864 1.470
0.300 1.249 1.220 1.524 0.864
1.000 0.717 1.240 0.889 0.537 0.889
0.750 0.882 1.240 1.094 0.716 1.094
2.000 0.355 1.240 0.441 0.269 0.441
1.500 0.487 1.240 0.604 0.358 0.604
4.000 0.157 1.260 0.198 0.134 0.198
3.000 0.223 1.250 0.279 0.179 0.279
5.000 0.117 1.260 0.148 0.107 0.148
BSE-1E
BSE-1E SX =
Project No.: W1895-88-01
Spectral acceleration values reported in units of "g"
"--" Indicates that spectral period was not used at that calculation step
0.472
0.00 ----------
Spectral Period
(seconds)
Probabilistic
Uniform-
Hazard
Maximum-
Rotated
Component
Scale Factor
MRC,
Probabilistic
General
Response
Spectrum
Site-Specific
BSE-1E
Earthquake
0.02 0.290 1.190 0.345 0.289 0.345
0.01 0.292 1.190 0.347 0.259 0.347
0.05 0.343 1.190 0.408 0.381 0.408
0.03 0.300 1.190 0.357 0.320 0.357
0.10 0.523 1.190 0.623 0.534 0.623
0.08 0.437 1.190 0.520 0.457 0.520
0.15 0.654 1.200 0.785 0.569 0.785
0.11 ------0.569 0.663
0.25 0.735 1.220 0.897 0.569 0.897
0.20 0.713 1.210 0.863 0.569 0.863
0.40 0.687 1.230 0.845 0.569 0.845
0.30 0.736 1.220 0.897 0.569 0.897
0.50
0.56
0.75
1.00
1.50
2.00
3.00
0.808
DESIGN RESPONSE SPECTRUM 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
4.00
5.00
0.11
0.08
0.06
0.18 1.24
1.25
1.26
1.26
0.776
0.472
0.138
1.23
--
1.24
1.24
1.24
0.223
0.63
--
0.49
0.38
0.25
0.317 0.472
0.311 0.212 0.311
0.159 0.223
0.569 0.776
--0.569 0.725
0.604 0.423 0.604
0.106 0.138
0.096 0.079 0.096
0.071 0.063 0.071
1 - BSSC 2014, aka. UCERF3_EventSet_All on GitHub
Project No.: W1895-88-01
Reference
Parent Fault Name San Joaquin Hills Compton Newport-Inglewood
alt 2
Newport-Inglewood
alt 1 Whittier alt 2 --
Parameter Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5
BSSC Online Scenario Catalog
Earthquake Magnitude 7.02 7.45 7.15 7.15 6.98 BSSC Online Scenario Catalog
Scenario Name San Joaquin Hills Compton Newport-Inglewood
alt 2
Newport-Inglewood
alt 1 Whittier alt 2
--
Fault Dip (˚)23 20 90 88 75 BSSC 2014
Fault Mechanism Thrust Thrust Right Lateral Right Lateral Right Lateral
BSSC 2014
Rake (˚)90 90 180 180 150 BSSC 2014
Fault Width 23.96 27.37 13.59 13.51 13.14
BSSC 2014
Rrup (km)5.8 14.85 13.6 13.73 19.59 --
ZTOR (km)2 5.2 0 0 0
--
Rx (km)5.44 16.07 13.6 13.74 19.59 --
Rjb (km)5.44 10.62 13.6 13.27 19.59
Average Site Class
Z1.0 (km)0.4 0.4 0.4 0.4 0.4 SCEC Community Velocity Model
Version 4, Iteration 26, Basin Depth
Vs30 (m/s)270 270 270 270 270
SCEC Community Velocity Model
Version 4, Iteration 26, Basin Depth
DETERMINISTIC SCENARIO EVENTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Z2.5 (km)4.3 4.3 4.3 4.3 4.3
EMPIRICAL ESTIMATION OF LIQUEFACTION POTENTIAL
DESIGN EARTHQUAKE
NCEER (1996) METHOD W 2001 UPDATES
EARTHQUAKE INFORMATION:ENERGY & ROD CORRECTIONS:
Earthquake Magnitude:Energy Correction (CE) for N60:Boring ID:B1
Peak Horiz. Acceleration PGAM (g):Rod Len.Corr.(CR) (0-no or 1-yes):
2/3 PGAM (g):Bore Dia. Corr. (CB):
Magnitude Scaling Factor:Sampler Corr. (CS):
*Indicates assumed value
DRAFTED BY: ACS CHECKED BY: JTA APRIL 2024 PROJECT NO. W1895-88-01 FIG. 13
LIQUEFACTION POTENTIAL - DESIGN EARTHQUAKE
625 CYPRESS AVE
SANTA ANA, CALIFORNIAENVIRONMENTAL GEOTECHNICAL MATERIALS
2807 MCGAW AVENUE - IRVINE, CALIFORNIA, 92614
PHONE: 949-491-6570
NCEER (1996) METHOD W 2001 UPDATES
EARTHQUAKE INFORMATION:
Magnitude Scaling Factor:1.459
Historic High Groundwater:35.0
Groundwater @ Exploration:49.5
DEPTH BLOW TOTAL EFFECT ADJUST LIQUEFACTION VOL.EQ.
TO COUNT STRESS STRESS BLOWS SAFETY STRAIN SETTLE.
BASE N O (TSF)O' (TSF)(N1)60 Tav/σ'o 15
LIQUEFACTION INDUCED SETTLEMENT
- DESIGN EARTHQUAKE
625 CYPRESS AVE
SANTA ANA, CALIFORNIA
DRAFTED BY: ACS CHECKED BY: JTA APRIL 2024 PROJECT NO. W1895-88-01 FIG. 14
ENVIRONMENTAL GEOTECHNICAL MATERIALS
2807 MCGAW AVENUE - IRVINE, CALIFORNIA, 92614
PHONE: 949-491-6570
TOTAL SETTLEMENT = 0.3 inch
127.5
127.5
127.5
127.5
127.5
127.5
127.5
127.5
127.5
127.5
127.5
127.5
127.5
127.5
142.9
142.9 49
142.9 49
128.3
142.9
142.9
128.3
128.3
128.3
128.3
128.3
128.3
112.7 49
112.7 49
112.7 49
119.5 48
119.5 48
119.5 48
120.5 62
119.5 70
119.5 70
120.5 71
120.5 62
120.5 62
132.3 70
132.3 70
120.5 71
132.3 82
132.3 82
132.3 70
132.3 65
132.3 65
132.3 65
125.2 48
125.7 72
132.3 65
125.2 61
125.2 48
125.2 48
116.5 38
116.5 38
125.2 61
116.5 38
116.5 38
(PCF)Dr (%)
116.5 45
116.5 45
WET REL.
EMPIRICAL ESTIMATION OF LIQUEFACTION POTENTIAL
MAXIMUM CONSIDERED EARTHQUAKE
NCEER (1996) METHOD W 2001 UPDATES
EARTHQUAKE INFORMATION:ENERGY & ROD CORRECTIONS:
Earthquake Magnitude:Energy Correction (CE) for N60:Boring ID:B1
Peak Horiz. Acceleration PGAM (g):Rod Len.Corr.(CR) (0-no or 1-yes):
Magnitude Scaling Factor:Bore Dia. Corr. (CB):
Historic High Groundwater:Sampler Corr. (CS):
625 CYPRESS AVE
SANTA ANA, CALIFORNIA
FIG. 15PROJECT NO. W1895-88-01
LIQUEFACTION POTENTIAL - MAXIMUM CONSIDERED EARTHQUAKE
APRIL 2024DRAFTED BY: ACS CHECKED BY: JTA
ENVIRONMENTAL GEOTECHNICAL MATERIALS
2807 MCGAW AVENUE - IRVINE, CALIFORNIA, 92614
PHONE: 949-491-6570
NCEER (1996) METHOD W 2001 UPDATES
EARTHQUAKE INFORMATION:Boring ID:B1
Earthquake Magnitude:7.30
Magnitude Scaling Factor:1.071
Historic High Groundwater:35.0
Groundwater @ Exploration:49.5
DEPTH BLOW TOTAL EFFECT ADJUST LIQUEFACTION VOL.EQ.
TO COUNT STRESS STRESS BLOWS SAFETY STRAIN SETTLE.
BASE N O (TSF)O' (TSF)(N1)60 Tav/σ'o 15
LIQUEFACTION SETTLEMENT ANALYSIS
MAXIMUM CONSIDERED EARTHQUAKE
TOTAL SETTLEMENT = 0.3 inch
FIG. 16PROJECT NO. W1895-88-01APRIL 2024
LIQUEFACTION INDUCED SETTLEMENT
- MAXIMUM CONSIDERED EARTHQUAKE
625 CYPRESS AVE
SANTA ANA, CALIFORNIA
WET REL.
CHECKED BY: JTADRAFTED BY: ACS
ENVIRONMENTAL GEOTECHNICAL MATERIALS
2807 MCGAW AVENUE - IRVINE, CALIFORNIA, 92614
PHONE: 949-491-6570
DE EARTHQUAKE INFORMATION:
Earthquake Magnitude:6.47 Boring ID:B1
Peak Horiz. Acceleration (g):0.434
1.0 1.0 0.5 116.5 0.03 0.02 0.008 1.25 44.8 1.7 14.2 1.0 151.1 7.80E-05 0.008 1.18E-02 7.1 8.42E-03 0.00
2.0 1.0 1.5 116.5 0.09 0.06 0.025 1.25 44.8 1.7 14.2 1.0 261.8 1.90E-04 0.019 2.87E-02 7.1 2.05E-02 0.00
3.0 1.0 2.5 116.5 0.15 0.10 0.041 1.25 44.8 1.7 14.2 1.0 337.9 2.30E-04 0.023 3.47E-02 7.1 2.48E-02 0.01
4.0 1.0 3.5 116.5 0.20 0.14 0.057 1.25 37.9 1.7 11.9 1.0 377.0 1.70E-04 0.017 3.17E-02 7.1 2.27E-02 0.01
5.0 1.0 4.5 116.5 0.26 0.18 0.074 1.25 37.9 1.7 11.9 1.0 427.5 1.70E-04 0.017 3.17E-02 7.1 2.27E-02 0.01
6.0 1.0 5.5 116.5 0.32 0.21 0.090 1.25 37.9 1.7 11.9 1.0 472.6 1.50E-04 0.015 2.80E-02 7.1 2.00E-02 0.00
7.0 1.0 6.5 116.5 0.38 0.25 0.106 1.25 37.9 1.7 11.7 1.0 511.5 1.50E-04 0.015 2.85E-02 7.1 2.04E-02 0.00
8.0 1.0 7.5 125.2 0.44 0.29 0.123 1.25 61.5 1.5 23.7 1.0 696.7 1.50E-04 0.015 1.22E-02 7.1 8.73E-03 0.00
9.0 1.0 8.5 125.2 0.50 0.34 0.141 1.25 61.5 1.4 22.5 1.0 731.9 1.50E-04 0.015 1.30E-02 7.1 9.30E-03 0.00
10.0 1.0 9.5 125.2 0.56 0.38 0.158 1.25 48.1 1.4 16.0 1.0 692.8 1.50E-04 0.015 1.96E-02 7.1 1.40E-02 0.00
11.0 1.0 10.5 125.2 0.63 0.42 0.175 1.25 48.1 1.3 15.5 1.0 721.5 4.50E-04 0.045 6.13E-02 7.1 4.38E-02 0.01
12.0 1.0 11.5 125.2 0.69 0.46 0.192 1.25 48.1 1.2 8.3 1.0 615.2 4.50E-04 0.045 1.29E-01 7.1 9.23E-02 0.02
13.5 1.5 12.8 125.7 0.77 0.51 0.213 1.25 71.6 1.2 28.6 1.0 980.6 1.60E-04 0.016 1.04E-02 7.1 7.44E-03 0.00
14.0 0.5 13.8 132.3 0.83 0.56 0.230 1.25 64.6 1.1 26.6 1.0 995.4 1.60E-04 0.016 1.14E-02 7.1 8.14E-03 0.00
15.0 1.0 14.5 132.3 0.88 0.59 0.244 1.25 64.6 1.1 25.5 1.0 1011.2 1.60E-04 0.016 1.19E-02 7.1 8.54E-03 0.00
16.0 1.0 15.5 132.3 0.95 0.63 0.261 1.25 64.6 1.0 24.8 1.0 1038.4 1.60E-04 0.016 1.24E-02 7.1 8.84E-03 0.00
17.0 1.0 16.5 132.3 1.01 0.68 0.278 1.25 64.6 1.0 24.1 1.0 1064.5 1.60E-04 0.016 1.28E-02 7.1 9.13E-03 0.00
18.0 1.0 17.5 132.3 1.08 0.72 0.296 1.25 81.7 1.0 40.2 1.0 1301.7 1.60E-04 0.016 6.93E-03 7.1 4.96E-03 0.00
19.0 1.0 18.5 132.3 1.15 0.77 0.313 1.25 81.7 1.0 39.1 1.0 1329.5 1.60E-04 0.016 7.15E-03 7.1 5.11E-03 0.00
20.0 1.0 19.5 132.3 1.21 0.81 0.329 1.25 70.1 0.9 31.9 1.0 1277.3 1.60E-04 0.016 9.14E-03 7.1 6.53E-03 0.00
21.0 1.0 20.5 132.3 1.28 0.86 0.346 1.25 70.1 0.9 31.2 1.0 1302.0 1.60E-04 0.016 9.39E-03 7.1 6.71E-03 0.00
22.0 1.0 21.5 132.3 1.34 0.90 0.363 1.25 70.1 0.9 30.5 1.0 1325.9 1.60E-04 0.016 9.63E-03 7.1 6.88E-03 0.00
23.0 1.0 22.5 120.5 1.41 0.94 0.378 1.25 70.8 0.9 33.9 0.9 1405.2 1.60E-04 0.016 8.49E-03 7.1 6.07E-03 0.00
24.0 1.0 23.5 120.5 1.47 0.98 0.393 1.25 70.8 0.8 33.3 0.9 1426.4 1.60E-04 0.016 8.67E-03 7.1 6.20E-03 0.00
25.0 1.0 24.5 120.5 1.53 1.02 0.407 1.25 61.8 0.8 27.7 0.9 1368.9 3.00E-04 0.030 2.03E-02 7.1 1.45E-02 0.00
26.0 1.0 25.5 120.5 1.59 1.06 0.421 1.25 61.8 0.8 27.3 0.9 1388.3 3.00E-04 0.030 2.07E-02 7.1 1.48E-02 0.00
27.0 1.0 26.5 120.5 1.65 1.10 0.435 1.25 61.8 0.8 26.9 0.9 1407.2 3.00E-04 0.030 2.10E-02 7.1 1.50E-02 0.00
28.0 1.0 27.5 119.5 1.71 1.14 0.448 1.25 70.0 0.8 35.4 0.9 1570.7 1.30E-04 0.013 6.55E-03 7.1 4.68E-03 0.00
29.0 1.0 28.5 119.5 1.77 1.18 0.462 1.25 70.0 0.8 34.9 0.9 1590.1 1.30E-04 0.013 6.66E-03 7.1 4.76E-03 0.00
30.0 1.0 29.5 119.5 1.83 1.22 0.475 1.25 48.5 0.8 20.0 0.9 1341.7 3.00E-04 0.030 3.01E-02 7.1 2.15E-02 0.01
31.0 1.0 30.5 119.5 1.89 1.26 0.487 1.25 48.5 0.7 19.7 0.9 1358.0 3.00E-04 0.030 3.05E-02 7.1 2.18E-02 0.01
32.0 1.0 31.5 119.5 1.95 1.30 0.500 1.25 48.5 0.7 19.5 0.9 1374.0 3.00E-04 0.030 3.09E-02 7.1 2.21E-02 0.01
33.0 1.0 32.5 112.7 2.01 1.34 0.512 1.25 49.1 0.7 20.6 0.9 1419.8 3.00E-04 0.030 2.90E-02 7.1 2.07E-02 0.00
34.0 1.0 33.5 112.7 2.06 1.38 0.523 1.25 49.1 0.7 20.4 0.9 1434.6 3.00E-04 0.030 2.94E-02 7.1 2.10E-02 0.01
35.0 1.0 34.5 112.7 2.12 1.42 0.534 1.25 49.1 0.7 20.2 0.9 1449.2 3.00E-04 0.030 2.97E-02 7.1 2.12E-02 0.01
36.0 1.0 35.5 128.3 2.18 1.46 0.546 1.25 0.7 13.7 0.9 1292.7 3.00E-04 0.030 4.72E-02 7.1 3.37E-02 0.00
37.0 1.0 36.5 128.3 2.24 1.50 0.558 1.25 0.7 13.6 0.9 1307.6 3.00E-04 0.030 4.77E-02 7.1 3.41E-02 0.00
38.0 1.0 37.5 128.3 2.31 1.55 0.571 1.25 0.7 24.4 0.9 1611.0 3.00E-04 0.030 2.37E-02 7.1 1.69E-02 0.00
39.0 1.0 38.5 128.3 2.37 1.59 0.583 1.25 0.7 24.1 0.9 1627.3 3.00E-04 0.030 2.40E-02 7.1 1.71E-02 0.00
40.0 1.0 39.5 128.3 2.43 1.63 0.594 1.25 0.7 16.8 0.9 1461.7 3.00E-04 0.030 3.70E-02 7.1 2.65E-02 0.00
41.0 1.0 40.5 128.3 2.50 1.67 0.606 1.25 0.6 16.6 0.8 1476.3 3.00E-04 0.030 3.74E-02 7.1 2.68E-02 0.00
42.0 1.0 41.5 128.3 2.56 1.72 0.617 1.25 0.6 16.5 0.8 1490.8 3.00E-04 0.030 3.78E-02 7.1 2.70E-02 0.00
43.0 1.0 42.5 142.9 2.63 1.76 0.629 1.25 0.6 26.5 0.8 1770.1 3.00E-04 0.030 2.14E-02 7.1 1.53E-02 0.00
44.0 1.0 43.5 142.9 2.70 1.81 0.641 1.25 0.6 26.3 0.8 1787.5 3.00E-04 0.030 2.16E-02 7.1 1.55E-02 0.00
45.0 1.0 44.5 142.9 2.77 1.86 0.653 1.25 0.6 26.0 0.8 1804.7 3.00E-04 0.030 2.19E-02 7.1 1.57E-02 0.00
46.0 1.0 45.5 142.9 2.85 1.91 0.665 1.25 49.3 0.6 20.3 0.8 1682.5 3.00E-04 0.030 2.95E-02 7.1 2.11E-02 0.00
47.0 1.0 46.5 142.9 2.92 1.95 0.677 1.25 49.3 0.6 20.1 0.8 1698.2 3.00E-04 0.030 2.99E-02 7.1 2.14E-02 0.00
48.0 1.0 47.5 127.5 2.98 2.00 0.687 1.25 0.6 12.5 0.8 1464.9 3.00E-04 0.030 5.30E-02 7.1 3.79E-02 0.00
49.0 1.0 48.5 127.5 3.05 2.04 0.696 1.25 0.6 12.4 0.8 1477.4 1.00E-02 1.000 1.78E+00 7.1 1.27E+00 0.00
50.0 1.0 49.5 127.5 3.11 2.08 0.705 1.25 0.6 12.3 0.8 1490.4 1.00E-02 1.000 1.79E+00 7.1 1.28E+00 0.00
51.0 1.0 50.5 127.5 3.18 2.13 0.714 1.25 0.6 8.1 0.7 1310.4 1.00E-02 1.000 2.95E+00 7.1 2.11E+00 0.00
52.0 1.0 51.5 127.5 3.24 2.17 0.723 1.25 0.6 8.1 0.7 1322.6 1.00E-02 1.000 2.96E+00 7.1 2.11E+00 0.00
53.0 1.0 52.5 127.5 3.30 2.21 0.731 1.25 0.6 8.1 0.7 1334.7 1.00E-02 1.000 2.96E+00 7.1 2.12E+00 0.00
54.0 1.0 53.5 127.5 3.37 2.26 0.739 1.25 0.6 8.1 0.7 1346.6 1.00E-02 1.000 2.97E+00 7.1 2.12E+00 0.00
55.0 1.0 54.5 127.5 3.43 2.30 0.746 1.25 0.6 14.2 0.7 1639.7 1.00E-02 1.000 1.51E+00 7.1 1.08E+00 0.00
56.0 1.0 55.5 127.5 3.49 2.34 0.754 1.25 0.6 14.1 0.7 1653.1 1.00E-02 1.000 1.52E+00 7.1 1.09E+00 0.00
57.0 1.0 56.5 127.5 3.56 2.38 0.761 1.25 0.6 14.1 0.7 1666.4 1.00E-02 1.000 1.52E+00 7.1 1.09E+00 0.00
58.0 1.0 57.5 127.5 3.62 2.43 0.768 1.25 0.6 14.0 0.7 1679.5 1.00E-02 1.000 1.53E+00 7.1 1.09E+00 0.00
59.0 1.0 58.5 127.5 3.69 2.47 0.775 1.25 0.6 14.0 0.7 1692.5 1.00E-02 1.000 1.54E+00 7.1 1.10E+00 0.00
60.0 1.0 59.5 127.5 3.75 2.51 0.781 1.25 0.6 13.9 0.7 1705.3 1.00E-02 1.000 1.54E+00 7.1 1.10E+00 0.00
61.0 1.0 60.5 127.5 3.81 2.55 0.788 1.25 0.5 12.9 0.7 1676.2 1.00E-02 1.000 1.69E+00 7.1 1.21E+00 0.00
REFERENCE: TECHNICAL ENGINEERING AND DESIGN GUIDES AS ADAPTED FROM THE US ARMY CORPS OF ENGINEERS, NO. 9
EVALUATION OF EARTHQUAKE-INDUCED SETTLEMENTS
IN DRY SANDY SOILS
DESIGN EARTHQUAKE
625 CYPRESS AVE
SANTA ANA, CALIFORNIAENVIRONMENTAL GEOTECHNICAL MATERIALS
2807 MCGAW AVENUE - IRVINE, CALIFORNIA, 92614
PHONE: 949-491-6570
DRAFTED BY: ACS CHECKED BY: JTA APRIL 2024 PROJECT NO. W1895-88-01 FIG. 17
TOTAL SETTLEMENT (inches) = 0.14
Number of Strain
Cycles [Nc]
Corrected Vol.
Strains [Ec]Settlement [S]
(inches)
rd Factor Mod. [Gmax]
(tsf)
[yeff]*[Geff]
[Gmax]
yeff
Shear Strain [yeff]*100%M7.5
[E15} (%)
Shear Stress
[Tav]
Field SPT [N]Correction
Factor [Cer]
Relative Density
[Dr] (%)
Correction
Factor [Cn]
Corrected
[N1]60
Depth of Base
of Strate (ft)
Thickness of
Layer (ft)point of Layer
(ft)
Soil Unit Weight
(pcf)Pressure at Mid-
point (tsf)
Pressure at Mid-
point (tsf)
MCE EARTHQUAKE INFORMATION:
Earthquake Magnitude:7.30 Boring ID:B1
Peak Horiz. Acceleration (g):0.651
1.0 1.0 0.5 116.5 0.03 0.02 0.012 1.25 44.8 1.7 14.2 1.0 151.1 1.60E-04 0.016 2.42E-02 13.3 2.29E-02 0.01
2.0 1.0 1.5 116.5 0.09 0.06 0.037 1.25 44.8 1.7 14.2 1.0 261.8 2.30E-04 0.023 3.47E-02 13.3 3.30E-02 0.01
3.0 1.0 2.5 116.5 0.15 0.10 0.062 1.25 44.8 1.7 14.2 1.0 337.9 2.30E-04 0.023 3.47E-02 13.3 3.30E-02 0.01
4.0 1.0 3.5 116.5 0.20 0.14 0.086 1.25 37.9 1.7 11.9 1.0 377.0 8.10E-04 0.081 1.51E-01 13.3 1.43E-01 0.03
5.0 1.0 4.5 116.5 0.26 0.18 0.111 1.25 37.9 1.7 11.9 1.0 427.5 8.10E-04 0.081 1.51E-01 13.3 1.43E-01 0.03
6.0 1.0 5.5 116.5 0.32 0.21 0.135 1.25 37.9 1.7 11.9 1.0 472.6 4.50E-04 0.045 8.40E-02 13.3 7.97E-02 0.02
7.0 1.0 6.5 116.5 0.38 0.25 0.160 1.25 37.9 1.7 11.7 1.0 511.5 4.50E-04 0.045 8.54E-02 13.3 8.10E-02 0.02
8.0 1.0 7.5 125.2 0.44 0.29 0.185 1.25 61.5 1.5 23.7 1.0 696.7 4.50E-04 0.045 3.66E-02 13.3 3.48E-02 0.01
9.0 1.0 8.5 125.2 0.50 0.34 0.211 1.25 61.5 1.4 22.5 1.0 731.9 4.50E-04 0.045 3.90E-02 13.3 3.70E-02 0.01
10.0 1.0 9.5 125.2 0.56 0.38 0.237 1.25 48.1 1.4 16.0 1.0 692.8 4.50E-04 0.045 5.87E-02 13.3 5.57E-02 0.01
11.0 1.0 10.5 125.2 0.63 0.42 0.262 1.25 48.1 1.3 15.5 1.0 721.5 1.00E-03 0.100 1.36E-01 13.3 1.29E-01 0.03
12.0 1.0 11.5 125.2 0.69 0.46 0.288 1.25 48.1 1.2 8.3 1.0 615.2 1.00E-03 0.100 2.87E-01 13.3 2.72E-01 0.07
13.5 1.5 12.8 125.7 0.77 0.51 0.320 1.25 71.6 1.2 28.6 1.0 980.6 3.70E-04 0.037 2.41E-02 13.3 2.28E-02 0.01
14.0 0.5 13.8 132.3 0.83 0.56 0.345 1.25 64.6 1.1 26.6 1.0 995.4 3.70E-04 0.037 2.63E-02 13.3 2.50E-02 0.00
15.0 1.0 14.5 132.3 0.88 0.59 0.365 1.25 64.6 1.1 25.5 1.0 1011.2 3.70E-04 0.037 2.76E-02 13.3 2.62E-02 0.01
16.0 1.0 15.5 132.3 0.95 0.63 0.391 1.25 64.6 1.0 24.8 1.0 1038.4 3.70E-04 0.037 2.86E-02 13.3 2.71E-02 0.01
17.0 1.0 16.5 132.3 1.01 0.68 0.417 1.25 64.6 1.0 24.1 1.0 1064.5 3.70E-04 0.037 2.95E-02 13.3 2.80E-02 0.01
18.0 1.0 17.5 132.3 1.08 0.72 0.443 1.25 81.7 1.0 40.2 1.0 1301.7 3.70E-04 0.037 1.60E-02 13.3 1.52E-02 0.00
19.0 1.0 18.5 132.3 1.15 0.77 0.469 1.25 81.7 1.0 39.1 1.0 1329.5 3.70E-04 0.037 1.65E-02 13.3 1.57E-02 0.00
20.0 1.0 19.5 132.3 1.21 0.81 0.494 1.25 70.1 0.9 31.9 1.0 1277.3 3.70E-04 0.037 2.11E-02 13.3 2.00E-02 0.00
21.0 1.0 20.5 132.3 1.28 0.86 0.519 1.25 70.1 0.9 31.2 1.0 1302.0 3.70E-04 0.037 2.17E-02 13.3 2.06E-02 0.00
22.0 1.0 21.5 132.3 1.34 0.90 0.544 1.25 70.1 0.9 30.5 1.0 1325.9 3.70E-04 0.037 2.23E-02 13.3 2.11E-02 0.01
23.0 1.0 22.5 120.5 1.41 0.94 0.567 1.25 70.8 0.9 33.9 0.9 1405.2 3.70E-04 0.037 1.96E-02 13.3 1.86E-02 0.00
24.0 1.0 23.5 120.5 1.47 0.98 0.588 1.25 70.8 0.8 33.3 0.9 1426.4 3.70E-04 0.037 2.00E-02 13.3 1.90E-02 0.00
25.0 1.0 24.5 120.5 1.53 1.02 0.610 1.25 61.8 0.8 27.7 0.9 1368.9 5.20E-04 0.052 3.51E-02 13.3 3.33E-02 0.01
26.0 1.0 25.5 120.5 1.59 1.06 0.631 1.25 61.8 0.8 27.3 0.9 1388.3 5.20E-04 0.052 3.58E-02 13.3 3.40E-02 0.01
27.0 1.0 26.5 120.5 1.65 1.10 0.652 1.25 61.8 0.8 26.9 0.9 1407.2 5.20E-04 0.052 3.65E-02 13.3 3.46E-02 0.01
28.0 1.0 27.5 119.5 1.71 1.14 0.672 1.25 70.0 0.8 35.4 0.9 1570.7 3.00E-04 0.030 1.51E-02 13.3 1.43E-02 0.00
29.0 1.0 28.5 119.5 1.77 1.18 0.692 1.25 70.0 0.8 34.9 0.9 1590.1 3.00E-04 0.030 1.54E-02 13.3 1.46E-02 0.00
30.0 1.0 29.5 119.5 1.83 1.22 0.711 1.25 48.5 0.8 20.0 0.9 1341.7 5.20E-04 0.052 5.21E-02 13.3 4.95E-02 0.01
31.0 1.0 30.5 119.5 1.89 1.26 0.731 1.25 48.5 0.7 19.7 0.9 1358.0 5.20E-04 0.052 5.29E-02 13.3 5.02E-02 0.01
32.0 1.0 31.5 119.5 1.95 1.30 0.750 1.25 48.5 0.7 19.5 0.9 1374.0 5.20E-04 0.052 5.36E-02 13.3 5.09E-02 0.01
33.0 1.0 32.5 112.7 2.01 1.34 0.767 1.25 49.1 0.7 20.6 0.9 1419.8 5.20E-04 0.052 5.02E-02 13.3 4.77E-02 0.01
34.0 1.0 33.5 112.7 2.06 1.38 0.784 1.25 49.1 0.7 20.4 0.9 1434.6 5.20E-04 0.052 5.09E-02 13.3 4.83E-02 0.01
35.0 1.0 34.5 112.7 2.12 1.42 0.801 1.25 49.1 0.7 20.2 0.9 1449.2 5.20E-04 0.052 5.15E-02 13.3 4.89E-02 0.01
36.0 1.0 35.5 128.3 2.18 1.46 0.819 1.25 0.7 13.7 0.9 1292.7 5.20E-04 0.052 8.17E-02 13.3 7.75E-02 0.00
37.0 1.0 36.5 128.3 2.24 1.50 0.837 1.25 0.7 13.6 0.9 1307.6 5.20E-04 0.052 8.26E-02 13.3 7.84E-02 0.00
38.0 1.0 37.5 128.3 2.31 1.55 0.856 1.25 0.7 24.4 0.9 1611.0 5.20E-04 0.052 4.10E-02 13.3 3.89E-02 0.00
39.0 1.0 38.5 128.3 2.37 1.59 0.874 1.25 0.7 24.1 0.9 1627.3 5.20E-04 0.052 4.16E-02 13.3 3.94E-02 0.00
40.0 1.0 39.5 128.3 2.43 1.63 0.891 1.25 0.7 16.8 0.9 1461.7 5.20E-04 0.052 6.42E-02 13.3 6.09E-02 0.00
41.0 1.0 40.5 128.3 2.50 1.67 0.908 1.25 0.6 16.6 0.8 1476.3 5.20E-04 0.052 6.49E-02 13.3 6.16E-02 0.00
42.0 1.0 41.5 128.3 2.56 1.72 0.925 1.25 0.6 16.5 0.8 1490.8 5.20E-04 0.052 6.56E-02 13.3 6.22E-02 0.00
43.0 1.0 42.5 142.9 2.63 1.76 0.943 1.25 0.6 26.5 0.8 1770.1 5.20E-04 0.052 3.70E-02 13.3 3.51E-02 0.00
44.0 1.0 43.5 142.9 2.70 1.81 0.962 1.25 0.6 26.3 0.8 1787.5 5.20E-04 0.052 3.75E-02 13.3 3.56E-02 0.00
45.0 1.0 44.5 142.9 2.77 1.86 0.980 1.25 0.6 26.0 0.8 1804.7 5.20E-04 0.052 3.80E-02 13.3 3.60E-02 0.00
46.0 1.0 45.5 142.9 2.85 1.91 0.997 1.25 49.3 0.6 20.3 0.8 1682.5 5.20E-04 0.052 5.12E-02 13.3 4.86E-02 0.00
47.0 1.0 46.5 142.9 2.92 1.95 1.015 1.25 49.3 0.6 20.1 0.8 1698.2 5.20E-04 0.052 5.18E-02 13.3 4.91E-02 0.00
48.0 1.0 47.5 127.5 2.98 2.00 1.030 1.25 0.6 12.5 0.8 1464.9 5.20E-04 0.052 9.18E-02 13.3 8.71E-02 0.00
49.0 1.0 48.5 127.5 3.05 2.04 1.044 1.25 0.6 12.4 0.8 1477.4 1.00E-02 1.000 1.78E+00 13.3 1.69E+00 0.00
50.0 1.0 49.5 127.5 3.11 2.08 1.058 1.25 0.6 12.3 0.8 1490.4 1.00E-02 1.000 1.79E+00 13.3 1.70E+00 0.00
51.0 1.0 50.5 127.5 3.18 2.13 1.071 1.25 0.6 8.1 0.7 1310.4 1.00E-02 1.000 2.95E+00 13.3 2.80E+00 0.00
52.0 1.0 51.5 127.5 3.24 2.17 1.083 1.25 0.6 8.1 0.7 1322.6 1.00E-02 1.000 2.96E+00 13.3 2.81E+00 0.00
53.0 1.0 52.5 127.5 3.30 2.21 1.096 1.25 0.6 8.1 0.7 1334.7 1.00E-02 1.000 2.96E+00 13.3 2.81E+00 0.00
54.0 1.0 53.5 127.5 3.37 2.26 1.108 1.25 0.6 8.1 0.7 1346.6 1.00E-02 1.000 2.97E+00 13.3 2.82E+00 0.00
55.0 1.0 54.5 127.5 3.43 2.30 1.119 1.25 0.6 14.2 0.7 1639.7 1.00E-02 1.000 1.51E+00 13.3 1.43E+00 0.00
56.0 1.0 55.5 127.5 3.49 2.34 1.130 1.25 0.6 14.1 0.7 1653.1 1.00E-02 1.000 1.52E+00 13.3 1.44E+00 0.00
57.0 1.0 56.5 127.5 3.56 2.38 1.141 1.25 0.6 14.1 0.7 1666.4 1.00E-02 1.000 1.52E+00 13.3 1.45E+00 0.00
58.0 1.0 57.5 127.5 3.62 2.43 1.152 1.25 0.6 14.0 0.7 1679.5 1.00E-02 1.000 1.53E+00 13.3 1.45E+00 0.00
59.0 1.0 58.5 127.5 3.69 2.47 1.162 1.25 0.6 14.0 0.7 1692.5 1.00E-02 1.000 1.54E+00 13.3 1.46E+00 0.00
60.0 1.0 59.5 127.5 3.75 2.51 1.172 1.25 0.6 13.9 0.7 1705.3 1.00E-02 1.000 1.54E+00 13.3 1.46E+00 0.00
61.0 1.0 60.5 127.5 3.81 2.55 1.181 1.25 0.5 12.9 0.7 1676.2 1.00E-02 1.000 1.69E+00 13.3 1.60E+00 0.00
REFERENCE: TECHNICAL ENGINEERING AND DESIGN GUIDES AS ADAPTED FROM THE US ARMY CORPS OF ENGINEERS, NO. 9
ENVIRONMENTAL GEOTECHNICAL MATERIALS
2807 MCGAW AVENUE - IRVINE, CALIFORNIA, 92614
PHONE: 949-491-6570
APRIL 2024 PROJECT NO. W1895-88-01 FIG. 18
625 CYPRESS AVE
SANTA ANA, CALIFORNIA
EVALUATION OF EARTHQUAKE-INDUCED SETTLEMENTS
IN DRY SANDY SOILS
MAXIMUM CONSIDERED EARTHQUAKE
9
9
9
7
7
7
3
3
4
4
4
3
3
6
6
15
13
13
3
3
9
9
6
18
14
14
16
16
10
10
10
3
3
16
16
DRAFTED BY: ACS
Pressure at Mid-
point (tsf)
CHECKED BY: JTA
Depth of Base
of Strate (ft)
Thickness of
Layer (ft)point of Layer
(ft)
Soil Unit Weight
(pcf)Pressure at Mid-
point (tsf)
Shear Stress
[Tav]
Correction
Factor [Cer]
Relative Density
[Dr] (%)
Correction
Factor [Cn]Field SPT [N]Settlement [S]
(inches)
Corrected
[N1]60 rd Factor Mod. [Gmax]
(tsf)
yeff
Shear Strain [yeff]*100%M7.5
[E15} (%)
Number of Strain
Cycles [Nc]
Corrected Vol.
Strains [Ec]
[yeff]*[Geff]
[Gmax]
Date:
USCS Soil Classification:
Infiltration Rate Calculation:
minutes
inches
inches
inches
inches
625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
DRAFTED BY: ACS CHECKED BY: JTA APRIL 2024 PROJECT NO. W1895-88-01 FIG. 19
Total Depth of Test Hole, Dt = 300
Infiltration Rate, It = 0.02 inches/hour
PERCOLATION TEST RESULTS AND CALCULATIONS
ENVIRONMENTAL GEOTECHNICAL MATERIALS
2807 MCGAW AVENUE - IRVINE, CALIFORNIA, 92614
PHONE: 949-491-6570
Initial Depth to Water, D0 = 180.7 Havg = 119.0 inches
Test Hole Radius, r = 4 ΔH = 0.5 inche
Final Depth to Water, D = 181.2 H = 118.8 inche
Time Interval, Δt = 30.00 Ho = 119.3 inches
8
7
6
180.7
5
4
Df
Final Depth
to Water
(in)
3 10:25 AM 10:55 AM 30.00 180.7
2 9:55 AM 10:25 AM 30.00 180.2
181.2 0.5 62.50
0.5 62.50
*If two consecutive measurements show that six inches of water seeps away in less than 25 minutes, the test shall be run for
an additional hour with measurements, taken every 10 minutes. Otherwise, pre-soak (fill) overnight. Obtain at least twelve
measurements per hole over at least six hours (approximately 30 minute intervals) with a precision of at least 0.25".
no
1 9:25 AM 9:55 AM 30.00 179.9
Trial No. Start Time End Time
Δt
Time
Interval
(min)
0
Initial
Depth to
Water
(in)
180.2 0.4 83.33
ΔD
Change in
Water Level
(in)
Percolation Rate
(min/in)
2 9:00 AM 9:25 AM 25 179.4 179.9
1 8:30 AM 8:55 AM 25 179.0 179.4 0.4
0.5 no
Trial No. Start Time End Time
Δt
Time
Interval
(min)
D0
Initial Depth to
Water
(in)
Df
Final Depth
to Water
(in)
ΔD
Change in
Water Level
(in)
Greater
than or
Equal to
6"?
(y/n)
Diameter (if round) = 8 Sides (if rectangular) = ----
PERCOLATION TEST DATA SHEE
Project:625 Cypress Avenu Project No.:W1895-88-01 Tuesday, March 5, 2024
Sandy Soil Criteria Test*
Test Hole Dimensions (inches)Length Width
Test Hole No.:B2 Tested By:JC
Depth of Test Hole, DT:25 Sandy Silt (ML)
𝐼∆
∆
Date:
USCS Soil Classification:
Infiltration Rate Calculation:
minutes
inches
inches
inches
inches
625 CYPRESS AVENUE
SANTA ANA, CALIFORNIAENVIRONMENTAL GEOTECHNICAL MATERIALS
2807 MCGAW AVENUE - IRVINE, CALIFORNIA, 92614
PHONE: 949-491-6570
DRAFTED BY: ACS CHECKED BY: JTA APRIL 2024 PROJECT NO. W1895-88-01 FIG. 20
Total Depth of Test Hole, Dt = 60
Infiltration Rate, It = 3.78 inches/hour
PERCOLATION TEST RESULTS AND CALCULATIONS
Initial Depth to Water, D0 = 31.2 Havg = 21.7 inches
Test Hole Radius, r = 2 ΔH = 14.3 inche
Final Depth to Water, D = 45.5 H = 14.5 inche
Time Interval, Δt = 10.00 Ho = 28.8 inches
8
14.3 0.7045.5
7
6 10:44 AM 10:54 AM 10.00 31.2
14.3 0.70
14.9 0.67
47.2
5 10:30 AM 10:40 AM 10.00 31.2
4 10:13 AM 10:23 AM 10.00 31.2
45.5
46.1
Df
Final Depth
to Water
(in)
3 9:59 AM 10:09 AM 10.00 31.2
2 9:43 AM 9:53 AM 10.00 31.2
46.9 15.7 0.64
16.0 0.63
*If two consecutive measurements show that six inches of water seeps away in less than 25 minutes, the test shall be run for
an additional hour with measurements, taken every 10 minutes. Otherwise, pre-soak (fill) overnight. Obtain at least twelve
measurements per hole over at least six hours (approximately 30 minute intervals) with a precision of at least 0.25".
yes
1 9:30 AM 9:40 AM 10.00 31.2
Trial No. Start Time End Time
Δt
Time
Interval
(min)
0
Initial
Depth to
Water
(in)
47.0 15.8 0.63
ΔD
Change in
Water Level
(in)
Percolation Rate
(min/in)
2 9:00 AM 9:25 AM 25 31.2 53.6
1 8:30 AM 8:55 AM 25 31.2 54.4 23.2
22.4 yes
Sandy Soil Criteria Test*
Trial No. Start Time End Time
Δt
Time
Interval
(min)
D0
Initial Depth to
Water
(in)
Df
Final Depth
to Water
(in)
ΔD
Change in
Water Level
(in)
Greater
than or
Equal to
6"?
(y/n)
Diameter (if round) = 4 Sides (if rectangular) = ----
Test Hole No.:B3 Tested By:JC
Depth of Test Hole, DT:5 Sandy Clay (CL
PERCOLATION TEST DATA SHEE
Project:625 Cypress Avenu Project No.:W1895-88-01 Tuesday, March 5, 2024
Test Hole Dimensions (inches) Length Width
𝐼∆
∆
APPENDIX A
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 April 23, 2024
APPENDIX A
FIELD INVESTIGATION
The site was explored on March 4, 2023, by excavating two 8-inch-diameter borings using a
truck-mounted hollow-stem auger drilling machine to depths of approximately 25 and 61 feet beneath
the ground surface. In addition, a 4-inch-diameter boring was excavated to a depth of approximately 5
feet below ground surface using hand auger equipment. Percolation testing was performed in borings
B2 and B3 to determine the infiltration rate of site soils. The site was further explored on March 13 and
14, 2024, by excavating two test pits to depths of approximately 15½ feet below the ground surface
using hand tools and mechanical equipment. The test pits were excavated at the existing building
foundations to verify footing depth and dimensions. Representative and relatively undisturbed samples
were obtained by driving a 3-inch, O. D., California Modified Sampler into the “undisturbed” soil mass
with blows from a 140-pound auto-hammer falling 30 inches as well as a slide hammer. The California
Modified Sampler was equipped with 1-inch by 23/8-inch diameter brass sampler rings to facilitate soil
removal and testing. Bulk samples were also obtained and Standard Penetration Tests were performed
in borings B1 and B2.
The soil conditions encountered in the borings and test pits were visually examined, classified and
logged in general accordance with the Unified Soil Classification System (USCS). The logs of the borings
and test pits are presented on Figures A1 through A6. The logs depict the soil and geologic conditions
encountered and the depth at which samples were obtained. The logs also include our interpretation
of the conditions between sampling intervals. Therefore, the logs contain both observed and
interpreted data. We determined the lines designating the interface between soil materials on the logs
using visual observations, penetration rates, excavation characteristics and other factors. The transition
between materials may be abrupt or gradual. Where applicable, the logs were revised based on
subsequent laboratory testing. The approximate locations of the borings and test pits are shown on
Figure 2.
CONCRETE: 6.5"
ARTIFICIAL FILL
Sandy Clay, soft, slighty moist to moist, dark brown, fine-grained.
ALLUVIUM
Sandy Clay, soft, slightly moist to moist, dark brown, fine-grained.
- firm
- soft, decrease in sand
Sand with Silt, poorly graded, loose, slightly moist to moist, dark yellowish
brown, fine- to medium-grained.
Sandy Clay, stiff, slightly moist, dark yellowish brown, fine- to
medium-grained.
Sandy Silt, firm, dry to slightly moist, dark yellowish brown, fine-grained.
- stiff, dry, calcium deposits
- oxidation stains
21.6
17.7
20.6
26.9
12.8
10.4
12.1
12.6
11.8
15.7
10.2
CL
SP-SM
CL
ML
BULK
0-5'
B1@3.5'
B1@5'
B1@8'
B1@10'
B1@13'
B1@15'
B1@18'
B1@20'
B1@23'
B1@25'
B1@28'
8
3
17
6
28
13
42
18
37
16
40
95.8
103.8
111.4
118.0
107.8
108.4
SAMPLE
NO.
HOLLOW STEM AUGER
... WATER TABLE OR SEEPAGE
DEPTH
IN
FEET
... DRIVE SAMPLE (UNDISTURBED)
GEOCON
- -
0
2
4
6
8
10
12
14
16
18
20
22
24
26
28
DR
Y
D
E
N
S
I
T
Y
EQUIPMENT
BORING 1
JC
MO
I
S
T
U
R
E
BY:
(P
.
C
.
F
.
)
DATE COMPLETED
... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
SOIL
CLASS
(USCS)
GR
O
U
N
D
W
A
T
E
R
SAMPLE SYMBOLS
CO
N
T
E
N
T
(
%
)
... CHUNK SAMPLE
03/04/2024ELEV. (MSL.)
PE
N
E
T
R
A
T
I
O
N
RE
S
I
S
T
A
N
C
E
(B
L
O
W
S
/
F
T
*
)
MATERIAL DESCRIPTION
LI
T
H
O
L
O
G
Y
... STANDARD PENETRATION TEST
W1895-88-01 BORING LOGS.GPJFigure A1,
Log of Boring 1, Page 1 of 3
NOTE:
PROJECT NO.
THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE
INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
W1895-88-01
- firm, slightly moist
- stiff
Sandy Clay, soft, slightly moist, yellowish brown, fine-grained.
- stiff
- firm, moist, decrease in sand
- stiff, increase in sand, fine gravel
Silty Clayey Sand, firm, slightly moist, yellowish brown, fine-grained.
Sandy Clay, firm, wet, dark yellowish brown, trace fine-grained.
- groundwater
- soft
- firm
14.1
14.1
17.5
10.0
17.6
11.1
12.9
15.8
22.2
19.9
ML
CL
SC-SM
CL
B1@30'
B1@33'
B1@35'
B1@38'
B1@40'
B1@43'
B1@45'
B1@48'
B1@50'
B1@55'
11
22
7
30
10
35
14
13
3
9
98.8
116.6
128.6
110.1
SAMPLE
NO.
HOLLOW STEM AUGER
... WATER TABLE OR SEEPAGE
DEPTH
IN
FEET
... DRIVE SAMPLE (UNDISTURBED)
GEOCON
- -
30
32
34
36
38
40
42
44
46
48
50
52
54
56
58
DR
Y
D
E
N
S
I
T
Y
EQUIPMENT
BORING 1
JC
MO
I
S
T
U
R
E
BY:
(P
.
C
.
F
.
)
DATE COMPLETED
... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
SOIL
CLASS
(USCS)
GR
O
U
N
D
W
A
T
E
R
SAMPLE SYMBOLS
CO
N
T
E
N
T
(
%
)
... CHUNK SAMPLE
03/04/2024ELEV. (MSL.)
PE
N
E
T
R
A
T
I
O
N
RE
S
I
S
T
A
N
C
E
(B
L
O
W
S
/
F
T
*
)
MATERIAL DESCRIPTION
LI
T
H
O
L
O
G
Y
... STANDARD PENETRATION TEST
W1895-88-01 BORING LOGS.GPJFigure A1,
Log of Boring 1, Page 2 of 3
NOTE:
PROJECT NO.
THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE
INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
W1895-88-01
- soft, increase in sand
Total depth of boring: 61 feet
Fill to 3 feet.
Groundwater encountered at 49.5 feet.
Backfilled with cement bentonite grout.
Concrete patched.
*Penetration resistance for 140-pound hammer falling 30 inches by
auto-hammer.
NOTE: The stratification lines presented herein represent the approximate
boundary between earth types; the transitions may be gradual.
17.9CLB1@60'8
SAMPLE
NO.
HOLLOW STEM AUGER
... WATER TABLE OR SEEPAGE
DEPTH
IN
FEET
... DRIVE SAMPLE (UNDISTURBED)
GEOCON
- -
60
DR
Y
D
E
N
S
I
T
Y
EQUIPMENT
BORING 1
JC
MO
I
S
T
U
R
E
BY:
(P
.
C
.
F
.
)
DATE COMPLETED
... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
SOIL
CLASS
(USCS)
GR
O
U
N
D
W
A
T
E
R
SAMPLE SYMBOLS
CO
N
T
E
N
T
(
%
)
... CHUNK SAMPLE
03/04/2024ELEV. (MSL.)
PE
N
E
T
R
A
T
I
O
N
RE
S
I
S
T
A
N
C
E
(B
L
O
W
S
/
F
T
*
)
MATERIAL DESCRIPTION
LI
T
H
O
L
O
G
Y
... STANDARD PENETRATION TEST
W1895-88-01 BORING LOGS.GPJFigure A1,
Log of Boring 1, Page 3 of 3
NOTE:
PROJECT NO.
THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE
INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
W1895-88-01
CONCRETE: 7"
ARTIFICIAL FILL
Sandy Clay, soft to firm, moist, dark brown, fine- to medium-grained.
ALLUVIUM
Sandy Clay, soft, slightly moist, dark yellowish brown, fine- to
medium-grained.
Sand with Silt, poorly graded, loose, slightly moist, dark yellowish brown,
fine- to medium-grained.
Sandy Silt, soft, dry to slightly moist, dark yellowish brown, fine-grained.
- firm
- stiff
Total depth of boring: 25 feet
Fill to 3 feet. No groundwater encountered.
Percolation testing performed.
Backfilled with soil cuttings and tamped.Concrete patched.
*Penetration resistance for 140-pound hammer falling 30 inches by
auto-hammer.
NOTE: The stratification lines presented herein represent the approximate
boundary between earth types; the transitions may be gradual.
10.2
18.6
14.2
13.6
18.5
CL
SP-SM
ML
B2@4.5'
B2@9.5'
B2@14.5'
B2@19.5'
B2@24'
8
10
11
17
16
SAMPLE
NO.
HOLLOW STEM AUGER
... WATER TABLE OR SEEPAGE
DEPTH
IN
FEET
... DRIVE SAMPLE (UNDISTURBED)
GEOCON
- -
0
2
4
6
8
10
12
14
16
18
20
22
24
DR
Y
D
E
N
S
I
T
Y
EQUIPMENT
BORING 2
JC
MO
I
S
T
U
R
E
BY:
(P
.
C
.
F
.
)
DATE COMPLETED
... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
SOIL
CLASS
(USCS)
GR
O
U
N
D
W
A
T
E
R
SAMPLE SYMBOLS
CO
N
T
E
N
T
(
%
)
... CHUNK SAMPLE
03/04/2024ELEV. (MSL.)
PE
N
E
T
R
A
T
I
O
N
RE
S
I
S
T
A
N
C
E
(B
L
O
W
S
/
F
T
*
)
MATERIAL DESCRIPTION
LI
T
H
O
L
O
G
Y
... STANDARD PENETRATION TEST
W1895-88-01 BORING LOGS.GPJFigure A2,
Log of Boring 2, Page 1 of 1
NOTE:
PROJECT NO.
THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE
INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
W1895-88-01
ARTIFICIAL FILL
Clay, firm, moist, very dark brown, trace fine- to medium-grained sand.
ALLUVIUM
Sandy Clay, firm, slightly moist to moist, dark yellowish brown, fine- to
medium-grained.
Total depth of boring: 5 feet
Fill to 3 feet.
No groundwater encountered.
Backfilled with soil cuttings and tamped.
NOTE: The stratification lines presented herein represent the approximate
boundary between earth types; the transitions may be gradual.
CL
BULK
0-5'
SAMPLE
NO.
HAND AUGER
... WATER TABLE OR SEEPAGE
DEPTH
IN
FEET
... DRIVE SAMPLE (UNDISTURBED)
GEOCON
- -
0
2
4
DR
Y
D
E
N
S
I
T
Y
EQUIPMENT
BORING 3
JC
MO
I
S
T
U
R
E
BY:
(P
.
C
.
F
.
)
DATE COMPLETED
... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
SOIL
CLASS
(USCS)
GR
O
U
N
D
W
A
T
E
R
SAMPLE SYMBOLS
CO
N
T
E
N
T
(
%
)
... CHUNK SAMPLE
03/04/2024ELEV. (MSL.)
PE
N
E
T
R
A
T
I
O
N
RE
S
I
S
T
A
N
C
E
(B
L
O
W
S
/
F
T
*
)
MATERIAL DESCRIPTION
LI
T
H
O
L
O
G
Y
... STANDARD PENETRATION TEST
W1895-88-01 BORING LOGS.GPJFigure A4,
Log of Boring 3, Page 1 of 1
NOTE:
PROJECT NO.
THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE
INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
W1895-88-01
CONCRETE: 7"
ARTIFICIAL FILL
Sandy Clay, firm, slightly moist to moist, very dark brown, fine- to
medium-grained.
- obstruction
Total depth of boring: 1.5 feet (refusal)
All fill.
No groundwater encountered.
Backfilled with soil cuttings and tamped.
Concrete patched.
SAMPLE
NO.
HOLLOW STEM AUGER
... WATER TABLE OR SEEPAGE
DEPTH
IN
FEET
... DRIVE SAMPLE (UNDISTURBED)
GEOCON
- -
0
DR
Y
D
E
N
S
I
T
Y
EQUIPMENT
BORING 2A
JC
MO
I
S
T
U
R
E
BY:
(P
.
C
.
F
.
)
DATE COMPLETED
... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
SOIL
CLASS
(USCS)
GR
O
U
N
D
W
A
T
E
R
SAMPLE SYMBOLS
CO
N
T
E
N
T
(
%
)
... CHUNK SAMPLE
03/04/2024ELEV. (MSL.)
PE
N
E
T
R
A
T
I
O
N
RE
S
I
S
T
A
N
C
E
(B
L
O
W
S
/
F
T
*
)
MATERIAL DESCRIPTION
LI
T
H
O
L
O
G
Y
... STANDARD PENETRATION TEST
W1895-88-01 BORING LOGS.GPJFigure A3,
Log of Boring 2A, Page 1 of 1
NOTE:
PROJECT NO.
THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE
INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
W1895-88-01
CONCRETE: 6.5"
ARTIFICIAL FILL
Clayey Sand, medium dense, slightly moist, dark yellowish brown, fine- to
medium-grained, rootlets.
ALLUVIUM
Clayey Sand, medium dense, slightly moist to moist, dark yellowish brown,
fine- to medium-grained.
Sand, poorly graded, loose to medium dense, dry to slightly moist, dark
yellowish brown, medium- to coarse-grained, fine gravel.
Silt, firm, dry to slightly moist, dark yellowish brown, trace fine-grained
sand.
- oxidation stains, black stains
Total depth of boring: 15.5 feet
Fill to 5 feet.
No groundwater encountered.
Backfilled with soil cuttings and tamped.
Concrete patched.
NOTE: The stratification lines presented herein represent the approximate
boundary between earth types; the transitions may be gradual.
15.1
7.1
9.6
11.8
11.7
SC
SP
ML
TP1@3.5'
TP1@6.5'
TP1@9.5'
TP1@12.5'
TP1@15'
103.2
109.6
99.6
112.8
111.4
SAMPLE
NO.
HAND AUGER
... WATER TABLE OR SEEPAGE
DEPTH
IN
FEET
... DRIVE SAMPLE (UNDISTURBED)
GEOCON
- -
0
2
4
6
8
10
12
14
DR
Y
D
E
N
S
I
T
Y
EQUIPMENT
TEST PIT TP1
JC
MO
I
S
T
U
R
E
BY:
(P
.
C
.
F
.
)
DATE COMPLETED
... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
SOIL
CLASS
(USCS)
GR
O
U
N
D
W
A
T
E
R
SAMPLE SYMBOLS
CO
N
T
E
N
T
(
%
)
... CHUNK SAMPLE
03/13/2024ELEV. (MSL.)
PE
N
E
T
R
A
T
I
O
N
RE
S
I
S
T
A
N
C
E
(B
L
O
W
S
/
F
T
*
)
MATERIAL DESCRIPTION
LI
T
H
O
L
O
G
Y
... STANDARD PENETRATION TEST
W1895-88-01 BORING LOGS.GPJFigure A5,
Log of Test Pit TP1, Page 1 of 1
NOTE:
PROJECT NO.
THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE
INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
W1895-88-01
CONCRETE: 5"
ARTIFICIAL FILL
Silty Sand, medium dense, slightly moist, dark brown, fine- to
medium-grained, fine gravel, trash (plastic), rootlets.
ALLUVIUM
Silty Sand, medium dense, dry to slightly moist, dark brown, fine- to
coarse-grained.
Clayey Sand, medium dense, slightly moist, dark yellowish brown, fine- to
medium-grained, fine gravel, porosity.
- increase in sand
Sand with Silt, poorly graded, medium dense, slightly moist, dark yellowish
brown, fine- to medium-grained.
Silt, firm, moist, dark yellowish brown, trace fine-grained sand, oxidation
stains, black deposits.
Total depth of boring: 15.5 feet
Fill to 3.5 feet.
No groundwater encountered.
Backfilled with soil cuttings and tamped.
Concrete patched.
NOTE: The stratification lines presented herein represent the approximate
boundary between earth types; the transitions may be gradual.
14.4
12.5
15.5
7.6
19.5
17.2
17.3
SM
SC
SP-SM
ML
BULK
0-3'
TP2@3'
TP2@5.5'
TP2@8'
TP2@9.5'
TP2@10'
TP2@12.5'
TP2@15'
106.2
118.6
110.6
94.0
94.5
111.4
108.4
SAMPLE
NO.
HAND AUGER
... WATER TABLE OR SEEPAGE
DEPTH
IN
FEET
... DRIVE SAMPLE (UNDISTURBED)
GEOCON
- -
0
2
4
6
8
10
12
14
DR
Y
D
E
N
S
I
T
Y
EQUIPMENT
TEST PIT TP2
JC
MO
I
S
T
U
R
E
BY:
(P
.
C
.
F
.
)
DATE COMPLETED
... SAMPLING UNSUCCESSFUL
... DISTURBED OR BAG SAMPLE
SOIL
CLASS
(USCS)
GR
O
U
N
D
W
A
T
E
R
SAMPLE SYMBOLS
CO
N
T
E
N
T
(
%
)
... CHUNK SAMPLE
03/14/2024ELEV. (MSL.)
PE
N
E
T
R
A
T
I
O
N
RE
S
I
S
T
A
N
C
E
(B
L
O
W
S
/
F
T
*
)
MATERIAL DESCRIPTION
LI
T
H
O
L
O
G
Y
... STANDARD PENETRATION TEST
W1895-88-01 BORING LOGS.GPJFigure A6,
Log of Test Pit TP2, Page 1 of 1
NOTE:
PROJECT NO.
THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND AT THE DATE
INDICATED. IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES.
W1895-88-01
APPENDIX B
625 Cypress Avenue
Geotechnical Investigation
Project No. W1895-88-01 April 23, 2024
APPENDIX B
LABORATORY TESTING
Laboratory tests were performed in accordance with “American Society for Testing and Materials
(ASTM)”, or other suggested procedures Selected samples were tested for direct shear strength,
consolidation and expansion characteristics, Atterberg limits, grain size analysis, maximum dry density
and optimum moisture content relationship, in-situ dry density and moisture content. The results of
the laboratory tests are summarized in Figures B1 through B21. The in-place dry density and moisture
content of the samples tested are presented on the boring and test pit logs, Appendix A.
Project No.: W1895-88-01
2.69
Boring No. B1 Normal Stress (kip/ft²) 1 3 5
Sample No. B1@3.5'Peak Shear Stress (kip/ft²) 0.74 1.93
0.05
Depth (ft) 3.5'Shear Stress @ End of Test (ksf) 0.72 1.92 2.69
Sample Type:RING Deformation Rate (in./min.) 0.05 0.05
Soil Identification:Initial Sample Height (in.) 1.0 1.0 1.0
Sandy Clay (CL)
Ring Inside Diameter (in.) 2.375 2.375 2.375
Initial Moisture Content (%) 25.2 24.1 25.2
Strength Parameters Initial Dry Density (pcf) 96.9 97.0 100.0
88.1 99.2
Peak 330 26 Soil Height Before Shearing (in.) 1.2 1.2 1.2
C (psf)Initial Degree of Saturation (%) 91.9
Ultimate 300 26 Final Moisture Content (%) 24.2 19.8
DIRECT SHEAR TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIAConsolidated Drained ASTM D-3080
Checked by: ACS
22.2
April 2024 Figure B1
0.0
1.0
2.0
3.0
4.0
5.0
0.0 1.0 2.0 3.0 4.0 5.0
Sh
e
a
r
S
t
r
e
s
s
(
k
s
f
)
Normal Stress (ksf)
Project No.: W1895-88-01
3.35
Boring No. B1 Normal Stress (kip/ft²) 1 3 5
Sample No. B1@8'Peak Shear Stress (kip/ft²) 0.95 1.88
0.05
Depth (ft) 8'Shear Stress @ End of Test (ksf) 0.82 1.86 3.07
Sample Type:RING Deformation Rate (in./min.) 0.05 0.05
Soil Identification:Initial Sample Height (in.) 1.0 1.0 1.0
Sandy Clay (CL)
Ring Inside Diameter (in.) 2.375 2.375 2.375
Initial Moisture Content (%) 22.6 25.4 18.8
Strength Parameters Initial Dry Density (pcf) 104.1 100.7 107.2
101.7 88.5
Peak 260 31 Soil Height Before Shearing (in.) 1.2 1.2 1.2
C (psf)Initial Degree of Saturation (%) 98.4
Ultimate 224 29 Final Moisture Content (%) 22.3 20.2
DIRECT SHEAR TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIAConsolidated Drained ASTM D-3080
Checked by: ACS
23.6
April 2024 Figure B2
0.0
1.0
2.0
3.0
4.0
5.0
0.0 1.0 2.0 3.0 4.0 5.0
Sh
e
a
r
S
t
r
e
s
s
(
k
s
f
)
Normal Stress (ksf)
Project No.: W1895-88-01
3.06
Boring No. TP1 Normal Stress (kip/ft²) 1 3 5
Sample No. TP1@3.5'Peak Shear Stress (kip/ft²) 0.72 1.88
0.05
Depth (ft) 3.5'Shear Stress @ End of Test (ksf) 0.71 1.86 2.96
Sample Type:RING Deformation Rate (in./min.) 0.05 0.05
Soil Identification:Initial Sample Height (in.) 1.0 1.0 1.0
Clayey Sand (SC)
Ring Inside Diameter (in.) 2.375 2.375 2.375
Initial Moisture Content (%) 17.6 16.5 15.4
Strength Parameters Initial Dry Density (pcf) 97.5 105.4 109.7
74.5 77.3
Peak 133 30 Soil Height Before Shearing (in.) 1.2 1.2 1.2
C (psf)Initial Degree of Saturation (%) 65.3
Ultimate 152 29 Final Moisture Content (%) 26.2 18.1
DIRECT SHEAR TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIAConsolidated Drained ASTM D-3080
Checked by: ACS
21.4
April 2024 Figure B3
0.0
1.0
2.0
3.0
4.0
5.0
0.0 1.0 2.0 3.0 4.0 5.0
Sh
e
a
r
S
t
r
e
s
s
(
k
s
f
)
Normal Stress (ksf)
Project No.: W1895-88-01
3.73
Boring No. TP1 Normal Stress (kip/ft²) 1 3 5
Sample No. TP1@6.5'Peak Shear Stress (kip/ft²) 1.36 2.38
0.05
Depth (ft) 6.5'Shear Stress @ End of Test (ksf) 1.27 2.32 3.58
Sample Type:RING Deformation Rate (in./min.) 0.05 0.05
Soil Identification:Initial Sample Height (in.) 1.0 1.0 1.0
Clayey Sand (SC)
Ring Inside Diameter (in.) 2.375 2.375 2.375
Initial Moisture Content (%) 8.3 6.4 6.6
Strength Parameters Initial Dry Density (pcf) 121.9 114.2 109.4
36.3 33.0
Peak 706 31 Soil Height Before Shearing (in.) 1.2 1.2 1.2
C (psf)Initial Degree of Saturation (%) 58.4
Ultimate 660 30 Final Moisture Content (%) 12.9 16.4
DIRECT SHEAR TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIAConsolidated Drained ASTM D-3080
Checked by: ACS
14.7
April 2024 Figure B4
0.0
1.0
2.0
3.0
4.0
5.0
0.0 1.0 2.0 3.0 4.0 5.0
Sh
e
a
r
S
t
r
e
s
s
(
k
s
f
)
Normal Stress (ksf)
Project No.: W1895-88-01
2.69
Boring No. TP2 Normal Stress (kip/ft²) 1 3 5
Sample No. TP2@3'Peak Shear Stress (kip/ft²) 0.80 2.04
0.05
Depth (ft) 3'Shear Stress @ End of Test (ksf) 0.76 1.96 2.69
Sample Type:RING Deformation Rate (in./min.) 0.05 0.05
Soil Identification:Initial Sample Height (in.) 1.0 1.0 1.0
Silty Sand (SM)
Ring Inside Diameter (in.) 2.375 2.375 2.375
Initial Moisture Content (%) 21.2 17.2 21.6
Strength Parameters Initial Dry Density (pcf) 101.0 107.0 97.5
80.6 80.0
Peak 431 25 Soil Height Before Shearing (in.) 1.2 1.2 1.2
C (psf)Initial Degree of Saturation (%) 85.4
Ultimate 351 26 Final Moisture Content (%) 24.9 20.4
DIRECT SHEAR TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIAConsolidated Drained ASTM D-3080
Checked by: ACS
19.7
April 2024 Figure B5
0.0
1.0
2.0
3.0
4.0
5.0
0.0 1.0 2.0 3.0 4.0 5.0
Sh
e
a
r
S
t
r
e
s
s
(
k
s
f
)
Normal Stress (ksf)
Project No.: W1895-88-01
3.19
Boring No. TP2 Normal Stress (kip/ft²) 1 3 5
Sample No. TP2@5.5'Peak Shear Stress (kip/ft²) 1.10 2.23
0.05
Depth (ft) 5.5'Shear Stress @ End of Test (ksf) 0.84 2.15 3.17
Sample Type:RING Deformation Rate (in./min.) 0.05 0.05
Soil Identification:Initial Sample Height (in.) 1.0 1.0 1.0
Silty Sand (SM)
Ring Inside Diameter (in.) 2.375 2.375 2.375
Initial Moisture Content (%) 14.6 16.1 17.7
Strength Parameters Initial Dry Density (pcf) 119.8 117.0 113.7
98.8 98.8
Peak 610 28 Soil Height Before Shearing (in.) 1.2 1.2 1.2
C (psf)Initial Degree of Saturation (%) 96.8
Ultimate 306 30 Final Moisture Content (%) 16.4 18.7
DIRECT SHEAR TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIAConsolidated Drained ASTM D-3080
Checked by: ACS
17.2
April 2024 Figure B6
0.0
1.0
2.0
3.0
4.0
5.0
0.0 1.0 2.0 3.0 4.0 5.0
Sh
e
a
r
S
t
r
e
s
s
(
k
s
f
)
Normal Stress (ksf)
Project No.: W1895-88-01
CONSOLIDATION TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
ASTM D-2435
April 2024 Figure B7
WATER ADDED AT 2.0 KSF
SAMPLE ID.
B1@8'
SOIL TYPE DRY DENSITY
(PCF)
INITIAL
MOISTURE (%)
FINAL
MOISTURE (%)
Sandy Clay (CL) 101.8 22.8 23.4
0
1
2
3
4
5
6
7
8
9
10
0.1 1.0 10.0
Pe
r
c
e
n
t
C
o
n
s
o
l
i
d
a
t
i
o
n
Consolidation Pressure (ksf)
Project No.: W1895-88-01
WATER ADDED AT 2.0 KSF
SAMPLE ID.
B1@13'
SOIL TYPE DRY DENSITY
(PCF)
INITIAL
MOISTURE (%)
FINAL
MOISTURE (%)
Sandy Clay (CL) 107.8 13.0 18.5
CONSOLIDATION TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
ASTM D-2435
April 2024 Figure B8
0
1
2
3
4
5
6
7
8
9
10
0.1 1.0 10.0
Pe
r
c
e
n
t
C
o
n
s
o
l
i
d
a
t
i
o
n
Consolidation Pressure (ksf)
Project No.: W1895-88-01
WATER ADDED AT 2.0 KSF
SAMPLE ID.
B1@18'
SOIL TYPE DRY DENSITY
(PCF)
INITIAL
MOISTURE (%)
FINAL
MOISTURE (%)
Sandy Silt (ML) 117.6 12.0 17.8
CONSOLIDATION TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
ASTM D-2435
April 2024 Figure B9
0
1
2
3
4
5
6
7
8
9
10
0.1 1.0 10.0
Pe
r
c
e
n
t
C
o
n
s
o
l
i
d
a
t
i
o
n
Consolidation Pressure (ksf)
Project No.: W1895-88-01
CONSOLIDATION TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
ASTM D-2435
April 2024 Figure B10
WATER ADDED AT 2.0 KSF
SAMPLE ID.
TP1@3.5'
SOIL TYPE DRY DENSITY
(PCF)
INITIAL
MOISTURE (%)
FINAL
MOISTURE (%)
Clayey Sand (SC) 114.8 14.5 16.9
0
1
2
3
4
5
6
7
8
9
10
0.1 1.0 10.0
Pe
r
c
e
n
t
C
o
n
s
o
l
i
d
a
t
i
o
n
Consolidation Pressure (ksf)
Project No.: W1895-88-01
WATER ADDED AT 2.0 KSF
SAMPLE ID.
TP1@6.5'
SOIL TYPE DRY DENSITY
(PCF)
INITIAL
MOISTURE (%)
FINAL
MOISTURE (%)
Clayey Sand (SC) 115.1 4.5 15.2
CONSOLIDATION TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
ASTM D-2435
April 2024 Figure B11
0
1
2
3
4
5
6
7
8
9
10
0.1 1.0 10.0
Pe
r
c
e
n
t
C
o
n
s
o
l
i
d
a
t
i
o
n
Consolidation Pressure (ksf)
Project No.: W1895-88-01
CONSOLIDATION TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
ASTM D-2435
April 2024 Figure B12
WATER ADDED AT 2.0 KSF
SAMPLE ID.
TP2@3'
SOIL TYPE DRY DENSITY
(PCF)
INITIAL
MOISTURE (%)
FINAL
MOISTURE (%)
Silty Sand (SM) 116.9 12.0 15.9
0
1
2
3
4
5
6
7
8
9
10
0.1 1.0 10.0
Pe
r
c
e
n
t
C
o
n
s
o
l
i
d
a
t
i
o
n
Consolidation Pressure (ksf)
Project No.: W1895-88-01
WATER ADDED AT 2.0 KSF
SAMPLE ID.
TP2@5.5'
SOIL TYPE DRY DENSITY
(PCF)
INITIAL
MOISTURE (%)
FINAL
MOISTURE (%)
Silty Sand (SM)122.5 9.8 13.5
CONSOLIDATION TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
ASTM D-2435
April 2024 Figure B13
0
1
2
3
4
5
6
7
8
9
10
0.1 1.0 10.0
Pe
r
c
e
n
t
C
o
n
s
o
l
i
d
a
t
i
o
n
Consolidation Pressure (ksf)
Project No.: W1895-88-01
WATER ADDED AT 2.0 KSF
SAMPLE ID.
TP2@8'
SOIL TYPE DRY DENSITY
(PCF)
INITIAL
MOISTURE (%)
FINAL
MOISTURE (%)
Clayey Sand (SC) 113.9 17.1 17.4
CONSOLIDATION TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
ASTM D-2435
April 2024 Figure B14
0
1
2
3
4
5
6
7
8
9
10
0.1 1.0 10.0
Pe
r
c
e
n
t
C
o
n
s
o
l
i
d
a
t
i
o
n
Consolidation Pressure (ksf)
Project No.: W1895-88-01
CONSOLIDATION TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
ASTM D-2435
April 2024 Figure B15
WATER ADDED AT 2.0 KSF
SAMPLE ID.
TP2@12.5'
SOIL TYPE DRY DENSITY
(PCF)
INITIAL
MOISTURE (%)
FINAL
MOISTURE (%)
Silt (ML) 111.4 16.9 17.3
0
1
2
3
4
5
6
7
8
9
10
0.1 1.0 10.0
Pe
r
c
e
n
t
C
o
n
s
o
l
i
d
a
t
i
o
n
Consolidation Pressure (ksf)
Project No.: W1895-88-01
N/P = Non-Plastic
Checked by: ACS
ATTERBERG LIMITS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIAASTM D-4318
April 2024 Figure B16
SYMBOL BORING DEPTH (ft) LL PL PI
MOISTURE
CONTENT AT
SATURATION
SOIL
BEHAVIOR
12 19.6 CL
B1 40' 24 16 8 15.6 CL
B1 35' 28 16
6 CL-ML
B1 50' 29 20 9 22.2 CL
B1 45' 22 15
9 19.9 CL
B1 60' 27 14 12 17.9 CL
B1 55' 27 17
CL
CL-ML
ML and OL
CH
OH and MH
0
10
20
30
40
50
60
0 20 40 60 80 100
PL
A
S
T
I
C
I
T
Y
I
N
D
E
X
,
P
I
LIQUID LIMIT, LL
Project No.: W1895-88-01
Sample No.
B1 @ 5'
B1 @ 10'
B1 @ 15'
B1 @ 20'
Percent Passing No. 200 Sieve
65.3
88.8
64.8
70.6
B1 @ 25'
B1 @ 30'
GRAIN SIZE ANALYSIS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
61.6
B1 @ 35'
B1 @ 40'
71.6
63.0
64.7
ASTM D-1140
April 2024 Figure B17
3
i
n
.
3/
4
i
n
.
3/
8
i
n
.
No
.
4
No
.
1
0
No
.
2
0
No
.
4
0
No
.
1
0
0
No
.
2
0
0
0.0
20.0
40.0
60.0
80.0
100.0
0.0010.010.1110100
Pe
r
c
e
n
t
P
a
s
s
i
n
g
N
o
.
2
0
0
S
i
e
v
e
Grain Diameter (mm)
GRAVEL
COARSE FINE
SAND
COARSE MEDIUM FINE
SILT AND CLAY
Project No.: W1895-88-01
B1 @ 60'
GRAIN SIZE ANALYSIS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
Checked by: ACS
#N/A
56.9
#N/A
#N/A
ASTM D-1140
April 2024 Figure B18
Percent Passing No. 200 Sieve
37.1
70.1
60.7
64.8
Sample No.
B1 @ 45'
B1 @ 48'
B1 @ 50'
B1 @ 55'
3
i
n
.
3/
4
i
n
.
3/
8
i
n
.
No
.
4
No
.
1
0
No
.
2
0
No
.
4
0
No
.
1
0
0
No
.
2
0
0
0.0
20.0
40.0
60.0
80.0
100.0
0.0010.010.1110100
Pe
r
c
e
n
t
P
a
s
s
i
n
g
N
o
.
2
0
0
S
i
e
v
e
Grain Diameter (mm)
GRAVEL
COARSE FINE
SAND
COARSE MEDIUM FINE
SILT AND CLAY
Project No.: W1895-88-01
89.0
Specimen Diameter
Date Time
Non-Expansive
Expansive
Very Low
Low
Expansion Index, EI50 CBC CLASSIFICATION * UBC CLASSIFICATION **
118.0
106.3
0.6
0.4
76.4
(%)
(pcf)
(pcf)
(cc)
(gm)
(gm)
B1+B3@0-5'
1.0
0
10
0.4174
0.417
Expansion Index ( Report ) =
Expansion Index (EI meas) =60.7
61
1490 0.47773/19/2024 11:00 1.0
14301.0
Pressure (psi)Elapsed Time (min) Dial Readings (in.)
678.1
648.4
378.1
11.0
(gm)
106.2
0.7
0.4
MOLDED SPECIMEN BEFORE TEST AFTER TEST
4.0
1.0
567.7
176.4
2.7
(in.)
(in.)
(gm)
(gm)
(Assumed)
4.0
Specimen Height
Wt. Comp. Soil + Mold
Wt. of Mold
Specific Gravity
Dry Wt. of Soil + Cont.
Wt. of Container
91-130
>130
625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
EXPANSION INDEX TEST RESULTS
ASTM D-4829
* Reference: 2022 California Building Code, Section 1803.5.3
** Reference: 1997 Uniform Building Code, Table 18-I-B.
Checked by: ACS
Medium
High
Very High
Expansive
Expansive
Expansive
April 2024 Figure B19
Moisture Content
Wet Density
Dry Density
Void Ratio
Total Porosity
Pore Volume
51-90
0-20
21-50
Degree of Saturation
606.4
352.5
176.4
22.0
129.5
1.1
606.4
176.4
2.7
0.477710:003/19/2024
87.151.1(%) [Smeas]
Add Distilled Water to the Specimen
3/18/2024
3/18/2024
10:00
10:10
1.0
Wet Wt. of Soil + Cont.
Sample No:
(g)
(g)
(g)
(g)
(g)
(g)
(%)
(pcf)
(pcf)
Preparation Method:
Project No.: W1895-88-01
Checked by: ACS
COMPACTION CHARACTERISTICS USING
MODIFIED EFFORT TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIAASTM D-1557
Apr 24 Figure B20
5 6
Wt. Compacted Soil + Mold 6270 6246 6222 6130
TEST NO. 1 2 3 4
Net Weight of Soil 1988 1964 1940 1848
Weight of Mold 4282 4282 4282 4282
Dry Weight of Soil + Cont. 2157.0 2111.2 2149.6 2097.0
Wet Weight of Soil + Cont. 2379.5 2364.5 2331.4 2240.0
Moisture Content 12.5 14.6 10.3 8.3
Weight of Container 377.8 378.1 378.1 377.8
Wet Density 131.6 130.0 128.4 122.3
A
Maximum Dry Density (pcf)117.6 Optimum Moisture Content (%)11.4
B1+B3@0-5'Sandy Clay (CL)
Dry Density 117.0 113.4 116.5 112.9
100.0
105.0
110.0
115.0
120.0
125.0
130.0
0.0 5.0 10.0 15.0 20.0
Dr
y
D
e
n
s
i
t
y
(
p
c
f
)
Moisture Content (%)
S.G. 2.65
S.G. 2.7
S.G. 2.75
Project No.: W1895-88-01
Checked by: ACS
CORROSIVITY TEST RESULTS 625 CYPRESS AVENUE
SANTA ANA, CALIFORNIA
April 2024 Figure B21
SUMMARY OF LABORATORY
POTENTIAL OF HYDROGEN (pH) AND RESISTIVITY TEST RESULTS
AASHTO T289 ASTM D4972 and AASHTO T288 ASTM G187
Sample No.
B1+B3@0-5'
pH
8.7
Resistivity
(ohm centimeters)
1500 (Corrosive)
SUMMARY OF LABORATORY CHLORIDE CONTENT TEST RESULTS
AASHTO T291 ASTM C1218
B1+B3@0-5'
B1+B3@0-5' 0.000 S0
TP2@0-3' 0.000 S0
Sample No.
SUMMARY OF LABORATORY WATER SOLUBLE SULFATE TEST RESULTS
AASHTO T290 ASTM C1580
Sample No.Water Soluble Sulfate
(% SO4)Sulfate Exposure
Chloride Ion Content (%)
0.022
MEMORANDUM
To: Date:
From:
Subject:No fee Building Plan Check & Permit for Project 22-6023 Cypress Center Restoration
(City Project)
The Public Works Agency is managing the design and construction process for an existing Fire
Station at Cypress Fire Station, 625 Cypress Avenue. The project will require a several building
permit(s) for grading, building, mechanical, electrical, plumbing. As this is a City project, we are
requesting few waivers for all applicable building & grading plan checking & permits.
The Scope of Work includes renovation of an existing City of Santa Ana Fire Station, interior tenant
improvements, ADA compliancy, minor demolition of a non-conforming structure, exterior fencing,
landscaping & concrete. This project involves no other site improvements.
If there are any questions, please contact Victor Rosales at Extension #5686 (office), or 714-904-
8950.
523 W. 6th St.
Los Angeles, CA
90014
Job # 23005.10
Version 1.0 / May 17th, 2024
City of Santa Ana
Cypress Fire Station
Structural Calculations
EXP. 03/31/26
No. C78947
STATEOF C A LIFORNIA
REGISTERED PROF E SSIONALENGINEE
R
NINAAZAD HMAHJOUB
E
CI V IL
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE
PROJECT DESCRIPTION & DESIGN CRITERIA 1
PROJECT DESCRIPTION 2
DESIGN CRITERIA 5
MATERIAL PROPERTIES 7
GRAVITY/SEISMIC WEIGH UP 9
SEISMIC LOADS AND DESIGN PARAMETERS 13
WIND LOADING 20
GRAVITY DESIGN 27
GRAVITY LOADING PLAN 28
JOISTS 30
ROOF JOISTS 31
CEILING JOISTS 44
BEAM DESIGN 54
COLUMN DESIGN 66
LATERAL DESIGN 73
SEISMIC AND WIND LOADING COMPARISON 74
SHEAR WALLS 76
N/S SHEAR WALL DESIGN 77
E/W SHEAR WALL DESIGN 82
DIAPHRAGM DESIGN 88
N/S DIAPHRAGM WALL DESIGN 89
E/W DIAPHRAGM WALL DESIGN 99
FOUNDATION DESIGN 107
SPREAD & ISOLATED FOOTINGS 1084.1
3.2
3.3
3.2.1
3.2.2
2.0
3.0
3.1
2.1
2.4
2.2
2.2.1
2.2.2
2.3
1.0
1.4
1.3
1.6
4.0
3.3.1
3.3.2
1.2
1.5
1.1
Project:
Project No:
By:
Date:Revision:Page:
1
CYPRESS FIRE STATION
23005.10
JS/CHP
1.0
PROJECT DESCRIPTION & DESIGN CRITERIA
Project:
Project No:
By:
Date:Revision:Page:
2
CYPRESS FIRE STATION
23005.10
JS/CHP
1.1
PROJECT DESCRIPTION
Project: 24159.10
1. Project Description
The project’s scope is to renovate and retrofit the existing structure located at 625 South Cypress
Avenue which formally served as a fire station into a new athletic and activity league center for the
community (shown in Figure 1). The existing building is deemed historic and was constructed in 1928
per the existing architectural drawings (shown in Figure 2).
The existing building consists of a one-story structure, approximately 3,500 ft2. The existing
architectural drawings show wood framed walls, high vaulted ceiling with wood trusses, and wood
sheathing (diagonal, straight, or boarded). The existing footings appear to be continuous or isolated
pad footings.
The gravity retrofit consists of replacing any damaged structural elements, installing new roof framing
member, ceiling framing members, and installing new footings to support new bearing and shear
walls. The lateral retrofit consists of strengthening some of the existing walls to serve as shear walls,
re-sheathing the roof diaphragm, and providing lateral supporting elements (collector framing
members and straps). The proposed renovation will need to avoid impacting the historic fabric of the
building.
Figure 1: Proposed Floor Plan
3
Project: 24159.10
Figure 2: Existing Floor Plan
4
Project:
Project No:
By:
Date:Revision:Page:
5
CYPRESS FIRE STATION
23005.10
JS/CHP
1.2
DESIGN CRITERIA
CODES & STANDARDS
Building Code
Edition / Year
Category Document Label Document Title Current
IBC IBC International Building Code 2021
State CBC California Building Code 2022
----
Loading ASCE 7 Minimum Design Loads for Buildings and
Other Structures 2016
Loading ASCE 41 Seismic Evaluation & Retrofit of Existing 2017
Concrete ACI 318 Building Code Requirements for Structural
Concrete 2019
Steel AISC 360 Specification for Structural Steel Buildings 2016
Steel AISC 358
Prequalified Connections for Special and
Intermediate Steel Moment Frames for
Seismic Applications
2016
w/Supplement 1
Steel AISC 341 Seismic Provisions for Structural Steel
Buildings 2016
Steel AWS D1.1 Structural Welding Code - Steel 2015
Steel AWS D1.4 Structural Welding Code - Reinforcing Steel 2018
Steel AWS D1.8 Structural Welding Code - Seismic
Supplement 2016
Wood AWC NDS National Design Specification for Wood
Construction 2018
Wood AF&PA SPDWS Special Seismic Provisions for Wind and
Seismic 2021
Masonry TMS 402/ACI 530 Building Code Requirements for Masonry
Structures 2016
Cold-
Formed
Steel
AISI S100
North American Specifications for the
Design of Cold-Formed Steel Structural
Members
2016
w/Supplement 2
Cold-
Formed
Steel
AISI S220 North American Standard for Cold-formed
Steel Framing - Nonstructural Members 2020
Cold-
Formed
Steel
AISI S400
(previously AISI S110)
North American Specifications for Seismic
Design of Cold-formed Stell Strucutral
Systems
2020
Aluminum ADM 1 Aluminum Design Manual
** The abbreviation for this document during this code cycle was NAS
6
Project:
Project No:
By:
Date:Revision:Page:
7
CYPRESS FIRE STATION
23005.10
JS/CHP
1.3
MATERIAL PROPERTIES
MATERIAL PROPERTIES
Date: 5/17/23 Page:
Project :Cypress Fire Station
No: 23005.00
By: CHP/JS
Materials (All values below are default values in general notes.)
1. Timber
a.) All posts and beams are DF#1 U.O.N. (Fb = 1000 psi, Fv = 180 psi, E = 1700000 psi for
dimension lumber), studs and plates are construction grade.
b.) All roof and ceiling joists are DF#2 U.O.N. (Fb = 900 psi, Fv = 180 psi, E = 1700000 psi for
dimension lumber)
c.) All PSLs are grade 2.0E (Fb = 2900 psi, Fv = 290 psi, E = 2000000 psi).
d.) ALL LVLs are grade 2.0E (Fb = 2600 psi, Fv = 285 psi, E = 2000000 psi).
e.) All existing wood is assumed to be DF #2 Struct. (Fb = 1300 psi, Fv = 90 psi, E = 1500000 psi)
2. Plywood grade, thickness. CDX or Type 2-M-W OSB
3. Plywood nailing schedule and diaphragm, shear wall design values.
4. Concrete, f’c= 4000 psi for all normal weight concrete.
5. Rebar is ASTM A615, Grade 60 U.O.N.
6. Structural Fasteners
a.) Erection, grouted, and timber connection bolts are ASTM A307, Grade A.
b.) High strength bolts are ASTM A325.
c.) Anchor rods and anchor bolts are ASTM F1554, Grade 55.
Fabricated Items
1. Hilti KB-TZ expansion anchors per manufacturer’s instructions.
2. Epoxy anchors use Hilti Hit-HY 200.
3. Simpson catalogue pages for wood straps. Indicate any modifications due to reduced nailing or
edge distance, 80% limit for State Schools, Hospital.
Printed on: 5/15/2024 at 10:52 AM 23005.10_Project Calculations_2021 IBC1.xlsx
8
Project:
Project No:
By:
Date:Revision:Page:
9
CYPRESS FIRE STATION
23005.10
JS/CHP
1.4
GRAVITY/SEISMIC WEIGH-UP
WEIGH UP
Dead Loads
Typical Roof
psf psf
psf psf
psf psf
psf psf
Ceiling (5/8" Gyp.) psf psf
Ceiling Joists psf psf
Existing 1x6 Sheathing psf psf
psf psf
Total psf psf
Street Elevation Roof
psf psf
psf psf
Barrel Tiles psf psf
psf psf
Existing 1x6 Sheathing psf psf
Ceiling (5/8" Gyp.) psf psf
(E) Ceiling Joists psf psf
Total psf psf
2x6 @ 16" O.C. Studs psf
(2) 1/2" Sheathing psf
5/8" Gyp. psf
Stucco + Insulation psf
psf
2x6 @ 16" O.C. Studs psf
1/2" Sheathing psf
(2) 5/8" Gyp. psf
Insulation psf
psf
2.9 2.9
MEP
Typical Exterior Wall Weight (per wall area)
19Total =
Typical Interior Wall Weight (per wall area)
1.5
1.5
6.3
1.0
Total = 10
31.0
Gravity Seismic
1.5 1.5
2.0 2.0
5.4 5.4
2.0 2.0
4.0 4.0
3.1 3.1
2.0 2.0
2.9 2.9
Cypress Fire Station
No: 23005.00
By: CHP/JS
Date: 5/17/23 Page:
Project :
MEP
1/2" Sheathing
3.5x14 LVL @ 24" O.C.
Trusses
23.0
Gravity
3.1
2.0
19.0
1.0
1.5
1.5
2x6 @ 24" O.C.
1/2" Sheathing
Topping Membrane
1.5
3.0
3.1
11.0
23.0
Seismic
3.1
1.5
19.0
2.0
1.0
31.0
1.5
Printed on: 5/2/2024 at 3:31 PM 23005.10_Project Calculations_2021 IBC1.xlsx
10
Cypress Fire Station
No: 23005.00
By: CHP/JS
Date: 5/17/23 Page:
Project :
Floor Weigh Up
Total =
Wall Weigh Up
Total =74094
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - -
- - - - - - -
- - -
- -- -
- - - - - - -
- --
- --- -- -
220.46 10.3 24866
49228 49228
0 0 0
0 0.0 0 24866
-
-
- --
0 0 0 0
--
- -- --
88964
-
-
- -- -
0.0 0000.0
WFLR, L
(psf)
0.0
0
0
0
0
-
-
-- - -
- - -
- -
0 0.0
-
- 0 0.0
- - - - -- -
-
-
-
-
- - - - ---
- -
-
- - - - -- - -
-
-
-
-
-
-
-
0
- - - - -- -
0
-
0.0
-
0 0.0 0.0 00
0.0 0
- 0
000.0
0.0 0
0.0
88964
Level ARoof1
(ft2)
WR1,D
(psf)
WMISC
(psf)ATOTAL (ft2)
AMISC
(ft2)
WTOTAL (lbs)
0
WROOF2
(psf)
31.0
0
R 2838 23.0 0.0 36030
AROOF2
(ft2)
765
0.0
WRoof, L
(psf)
0.0
0.0
-
-
-
-
-
-
-
-
Alternate Method
Interior Walls Exterior Walls Total
LTOTAL
(ft)
WWALL
(psfover wall)WWALL (lbs)LTOTAL
(ft)
WWALL
(psfover wall)WWALL (lbs) WWALL (lbs)
0 0.0 0 165.16 18.6
0
0 0.0
Level
R
R1 (Ext.)
R2(Int.)
-
-
-
-
-
-
-
-
-
hSTORY
(ft)
0
16
11
-
-
0
0.0
0.0
-
-
-
Printed on: 5/2/2024 at 3:31 PM 23005.10_Project Calculations_2021 IBC1.xlsx
11
Cypress Fire Station
No: 23005.00
By: CHP/JS
Date: 5/17/23 Page:
Project :
Weigh Up Summary
Total Seismic Weight =
Check Vertical Type 2 Irregularity - Weight (Mass)
-
-
-
Seismic Weigh Up
Level
-
-
0
0
ELF Procedure PERMITTED
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
REMARKS
#DIV/0!
-
-
R
-
-
-
-
-
-
-
Walls
Above
Walls
Below
-
-
WSTORY (wx)
88964
0
- -
- -
Floor
kipslbs lbs lbs
0
0
-
0 0
0
-
-
-
-
-
-
0 37047
0 0
0 0
126.0
126.0
0.0
0.0
0.0
-
-
-
-
Check level
below
%
-
-
-
- -
- -
- -
-
- -
-
-
-
-
0.0
-
-
-
-
WSTORY (wx)
kips
126.0
0.0
0.0
0.0
0.0
-
-
Level
R
-
-
-
-
-
-
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
-
-
Defined by Table 12.3-2 (ASCE 7-16): If adjacent story masses differ by more than 150%, a Type 2 -Weight
(mass) irregularity is triggered.
-
Check level
above
%
0%
#DIV/0!
#DIV/0!
#DIV/0!
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Printed on: 5/2/2024 at 3:31 PM 23005.10_Project Calculations_2021 IBC1.xlsx
12
Project:
Project No:
By:
Date:Revision:Page:
13
CYPRESS FIRE STATION
23005.10
JS/CHP
1.5
SEISMIC PARAMETERS AND DESIGN LOADS
Project: 23005.10
1
1.5 SEISMIC LOADS & DESIGN PARAMETERS
The seismic design load parameters and Site Classification are outlined in Table 1. These values were provided by
GEOCON and summarized in their geotechnical report dated April 23, 2024. A site-specific analysis was performed.
Table 1: Seismic Design Parameters
Seismic Parameter Value
Seismic Importance Factor, Ie 1.0
Risk Category II
Mapped Spectral Response Accelerations Ss = 1.288 g, S1 = 0.460 g
Site Classification D (Fa=1.0, Fv=1.84)
Spectral Response Coefficients: SDS = 1.090 g, SD1 = 0.792 g
Seismic Design Category D
14
SEISMIC FORCES per ASCE 7-16
Seismic Parameters for MCER ground motions
SS=S1=
Design Spectrum
Site Class =
Fa =IBC Table 1613.2.3(1)
Fv =IBC Table 1613.2.3(2)
SMS ==FaSS
SM1 ==FvS1
SDS ==(2/3)SMS
SD1 ==(2/3)SM1
SD1(mod) ==1.5 x SD1 150% amplification for T>1.5Ts applies for ELF & MRSA Procedure
T0 ==0.2(SD1/SDS)
TS ==(SD1/SDS)
TL =Long period Transition
Seismic Design Category (SDC)
Risk Category =
Seismic Importance Factor, Ie =
Design Category (based on SDS) =IBC Table 1613.2.5(1)
Design Category (based on SD1) =IBC Table 1613.2.5(2)
Design Category (governing) = Worst Case
(R/I)xCs = Unreduced N/S base shear
(R/I)xCs =Unreduced E/W base shear
Project :
8.0sec
0.73sec
0.15sec
0.792g
1.090g
1.188g
If Site Class D is selected as a Default (ie no site classification
by Geotechnical Engineer), then Fa shall not be less than 1.2
[Ref CBC/IBC s1613.2.3].
Per s11.4.8: Exception 2: For S1 > 0.2, the Design Basis
Earthquake spectrum is amplified by up to 1.5 x eq. 11.4-6 &
11.4-7 for T > 1.5Ts, or = Sds for Ts > T > 1.5Ts.
D
1.76g
1.84
1.00
1.188g
II
D
D
1.00
D
1.288g 0.460g
No:
CHP/JS
5/17/23
23005.00
Page:Date:
By:
Cypress Fire Station
1.09g
1.09g
0.0g
0.2g
0.4g
0.6g
0.8g
1.0g
1.2g
1.4g
1.6g
0.0sec 0.5sec 1.0sec 1.5sec 2.0sec 2.5sec 3.0sec 3.5sec 4.0sec
Sp
e
c
t
r
a
l
A
c
c
e
l
e
r
a
t
i
o
n
,
S
a
Period, T
Elastic (Unreduced) Design Response Spectrum
(including effect of s11.4.8 Exception 2, where applicable)
Sa
To
Ts
Sa, N/S
Sa, E/W
Printed on: 5/14/2024 at 3:02 PM 23005.10_Project Calculations_2021 IBC1.xlsx
15
PER GEOTECHNICAL
REPORT
N/S SEISMIC FORCES per ASCE 7-16
Structural System
Seismic Force Resisting System:
Response Modification Coefficient, R:
System Limitation/ Height Limit ft
Structure Period
T =building period by analysis
type =
hn =Structure height
Ta =ASCE 7-16 eq. (12.8-7)
Cu =Period Cap Does not Apply
Cs mod. factor =Exemption #2 of 11.4.8, ASCE 7-16
Tused =Base Shear Period used Tused =<-- For Drifts
Calculate Base Shear
Strength Drifts (period cap not considered)
ASCE 7 eq. (12.8.2) Governs <-- for strength
ASCE 7 eq. (12.8.2) Governs <-- for drifts
Project :
15.0 ft
65
Other Structural System
Date: 5/17/23 Page:
Cypress Fire Station
No:
0.17gCs =0.17g=SDS
(R/Ie)=SDS
(R/Ie)Cs shall equal the value from ASCE 7 eq. (12.8-2)
=SD1TL
T(R/Ie)
0.05g
SD1TL
T2(R/Ie) T2(R/Ie)
23005.00
By: CHP/JS
100%
1.40
0.15 sec 0.15 sec
6.50
A.15 Light frame (wood) walls sheathed with wood structural panels
rated for shear resistance or steel sheets
0.15 sec
Cs =T(R/Ie)
However, Cs need not exceed ASCE 7 eq. (12.8-3) if T is less
than TL
Cs =
Cs =
& Cs need not exceed ASCE 7 eq. (12.8-4) if T is greater the TL
Cs shall not be less than ASCE 7 eq. (12.8-5)
0.80g
41.95gCs ==41.95g
=SD10.17g
=
0.04g Strength: if S1 > 0.60g then Cs shall not be less than ASCE 7 eq. (12.8-6); Drift: Cs
shall not be less than ASCE 7 eq. (12.8-6), regardless of S10.04g =0.5S1
(R/Ie)
max(0.044S
DsIe, 0.01)N.R.
0.168g
(R/Ie)
SD1=
=max(0.044S
DsIe, 0.01)
=0.5S1
Cs =0.168g
Cs =
Printed on: 5/14/2024 at 3:02 PM 23005.10_Project Calculations_2021 IBC1.xlsx
16
E/W SEISMIC FORCES per ASCE 7-16
Structural System
Seismic Force Resisting System:
Response Modification Coefficient, R:
System Limitation/ Height Limit ft
Structure Period
T =building period by analysis
type =
hn =Structure height
Ta =ASCE 7-16 eq. (12.8-7)
Cu =Period Cap Does not Apply
Cs mod. factor =Exemption #2 of 11.4.8, ASCE 7-16
Tused =Base Shear Period used Tused =<-- For Drifts
Calculate Base Shear
Strength Drifts (period cap not considered)
ASCE 7 eq. (12.8.2) Governs <-- for strength
ASCE 7 eq. (12.8.2) Governs <-- for drifts
Project :
0.15 sec
Other Structural System
Cypress Fire Station
No: 23005.00
By: CHP/JS
Date: 5/17/23 Page:
Cs =0.168g
Cs ==
=
A.15 Light frame (wood) walls sheathed with wood structural panels rated for
shear resistance or steel sheets
100%
SDS
(R/Ie)
15.0 ft
0.15 sec 0.15 sec
65
Cs shall equal the value from ASCE 7 eq. (12.8-2)0.17g SDS =(R/Ie)0.17g
1.40
T(R/Ie)
However, Cs need not exceed ASCE 7 eq. (12.8-3) if T is less
than TL
& Cs need not exceed ASCE 7 eq. (12.8-4) if T is greater the TL
Cs =0.04g =0.5S1
(R/Ie)
Cs =0.05g =max(0.044S
DsIe, 0.01)
Cs =41.95g =SD1TL
T2(R/Ie)
SD1
6.50
=Cs shall not be less than ASCE 7 eq. (12.8-5)
Strength: if S1 > 0.60g then Cs shall not be less than ASCE 7 eq. (12.8-6); Drift: Cs
shall not be less than ASCE 7 eq. (12.8-6), regardless of S1
SD1
T(R/Ie)
41.95g =SD1TL
T2(R/Ie)
max(0.044S
DsIe, 0.01)
Cs =0.168g
N.R.
0.80g
(R/Ie)0.04g =0.5S1
=Cs =0.17g
Printed on: 5/14/2024 at 3:02 PM 23005.10_Project Calculations_2021 IBC1.xlsx
17
Standard:
Hazard Level:
N/S VERTICAL SEISMIC FORCE DISTRIBUTION (Equivalent Lateral Force Procedure)
Input Parameters
Cs = Diaphragm Force @ each Level
WTotal =kips (Eqn 12.10-1, ASCE 7-16)
EBF =existing building reduction factor
kips (LRFD)
Vbase =kips (ASD)0.2SDSIewpx (Eqn 12.10-2, ASCE 7-16)
T =sec 0.4SDSIewpx (Eqn 12.10-3, ASCE 7-16)
k = per section 12.8.3
SDS =
Ie =
Lateral Force @ each Level
Fx LRFD
R
-
-
-
-
-
-
-
-
-
-
-
S =
wpx
1.00
(Fpx)max =
1.09
1.00
Cypress Fire Station
No: 23005.00
By: CHP/JS
Date: 5/17/23 Page:
0.75
ASCE 7-16
BSE-2E
Project :
Vbase =16
S wi
11
0.15
(Fpx)min =
0.2 W
126 Fpx = S Fi
Cvx = wxhx
k
Fx = CvxV S wihi
k
Input Parameters Lateral Force
Le
v
e
l
hSTORY hx wx wxhx
k
ft feet kips kip-ft
Fx ASD
kips
Seismic Force Distribution
wpx
Diaphragm Force to ASCE 7-16
Fd ASD
kipskips
126 2016 15.8 11.1 126.0
0.0 0.0
0.0 0.0 0.0 0 0.0 0.0 0.0 0.0
0.0 0.00.0 0
0.0
16.0
0.0 0.0 0.0
0
00 0
00
126
0.0 0.0 0 0 0 00
0
0
00.0 0.0 0
0 0.0 0.0
0.0 0.0
0
0.0
0
000 0
0.0
0.0 0.0 0.0
0.0
0.0 0.0 0 0 0
0.0
0.0 0 0.0 0.0 0.00.0 0.0
0.0 0.0 0.0
0 0.0 0.0
0.0 0.0 0.0 0 0.0 0.0
0 0.0 0.0
0.0
0.0
0.0
0.0
Fx
0.0
0Fx
0Fx
Fx
Fx
0
00.0
0Fx0.0
0.0
0Fx
0
0.0
0.0
0.0
0
0
Fx
Fx
0.0 0.0
0.0
0.0
0.0
0.0
0.0
Fx
Fx
0
0 0
0
0
0
0
0 0 0
0.0
0.0
0.0
0.0
0.0
0.0
0
0
0.0
(without ρ or Ωo)
19
Fpx,min Fpx,max
kips
Fpx
kips
Control
Force
Min 2727 55
kips kips
Fd
16.0 16.0 126 2016 16
0.0 0.0 0
kips
11 16
0
Printed on: 5/14/2024 at 3:07 PM 23005.10_Project Calculations_2021 IBC1.xlsx
18
Standard:
Hazard Level:
E/W VERTICAL SEISMIC FORCE DISTRIBUTION (Equivalent Lateral Force Procedure)
Input Parameters
Cs = Diaphragm Force @ each Level
WTotal =kips (Eqn 12.10-1, ASCE 7-16)
EBF =existing building reduction factor
kips (LRFD)
Vbase =kips (ASD)0.2SDSIwpx (Eqn 12.10-2, ASCE 7-16)
T =sec 0.4SDSIwpx (Eqn 12.10-3, ASCE 7-16)
k = per ASCE 41 sections 4 & 7
SDS =
Ie =
Lateral Force @ each Level
Fx LRFD
R
-
-
-
-
-
-
-
-
-
-
-
S =
0 0.0 0.0 0.0 0.0 0.0
126.0 2016 15.8 11.1 126.0
0.0 Fx 0 0.0
0 Fx 0 0
0.0 Fx 0 0.0
0
0
0 0 0
0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0
0 00.0
0 Fx
0
0 0
0.0 0.0 0 0 0 0 0 0 0
0.0 0.0 0 0 0 0 0 0 0
0 Fx 0
0 Fx 0 0
Fx 0 0
0.0 0.0 0 0 0 0 0
0.0 0 0 0 0 0 0 0 0
0
0 0
0 00 Fx
kips
16 Min 27 19
00
0 0
Fx
Fx
0
55
0 Fx 0 0
00 0 0 0
Input Parameters Lateral Force Diaphragm Force to ASCE 7-16
Le
v
e
l
hSTORY hx wx wxhx
k Fx ASD wpx Fpx,min Fpx,max Fpx Control Fd ASD
kips kips Force kips
0
wpx0.75 S wi
Vbase =16
ft feet kips kip-ft kips kips kips kips
11 (Fpx)min =
0.15 (Fpx)max =
1.00
1.09
1.00
Cvx = wxhx
k
Fx = CvxV
Cypress Fire Station
No: 23005.00
By: CHP/JS
Date: 5/17/23 Page:
Project :
0.0 0.0 0
0 0 0
0
0
0.0
0.0
0.0
0.0
0.0 0.0
0.0 0.0 0
0
ASCE 7-16
BSE-2E
2016 16 11 126 27
0 0 0 0 0
0.2 W
126 Fpx = S Fi
S wihi
k
(without ρ or Ωo)
0 0 0
Fd
16.0 126
Seismic Force Distribution
0.0 0 0 0 0 0
0.0 0.0 0
16.0
Printed on: 5/14/2024 at 3:07 PM 23005.10_Project Calculations_2021 IBC1.xlsx
19
Project:
Project No:
By:
Date:Revision:Page:
20
CYPRESS FIRE STATION
23005.10
JS/CHP
1.6
WIND LOADING
Holmes US
523 West 6th St. Suite 1122
Los Angeles, CA 90014
Project Job Ref.
Section Sheet no./rev.
1
Calc. by
C
Date
4/29/2024
Chk'd by Date App'd by Date
WIND LOADING
In accordance with ASCE7-16
Using the directional design method
Tedds calculation version 2.1.13
Building data
Type of roof;Flat
Length of building ;b = 90.50 ft
Width of building ;d = 42.50 ft
Height to eaves;H = 15.00 ft
Mean height;h = 15.00 ft
General wind load requirements
Basic wind speed;V = 95.0 mph
Risk category;II
Velocity pressure exponent coef (Table 26.6-1);Kd = 0.85
Ground elevation above sea level ;zgl = 0 ft
Ground elevation factor ;Ke = exp(-0.0000362 zgl/1ft) = 1.00
Exposure category (cl 26.7.3);B
Enclosure classification (cl.26.12);Partially enclosed buildings
Internal pressure coef +ve (Table 26.13-1);GCpi_p = 0.55
Internal pressure coef –ve (Table 26.13-1);GCpi_n = -0.55
Gust effect factor;Gf = 0.85
Minimum design wind loading (cl.27.1.5);pmin_r = 8 lb/ft2
Topography
Topography factor not significant ;Kzt = 1.0
Velocity pressure equation ;q = 0.00256 Kz Kzt Kd V2 1psf/mph2;
Velocity pressures table
z (ft)Kz (Table 26.10-1)qz (psf)
15.00 0.57 11.19
Peak velocity pressure for internal pressure
Peak velocity pressure – internal (as roof press.);qi = 11.19 psf
Pressures and forces
Net pressure;p = q Gf Cpe - qi GCpi;
21
Holmes US
523 West 6th St. Suite 1122
Los Angeles, CA 90014
Project Job Ref.
Section Sheet no./rev.
2
Calc. by
C
Date
4/29/2024
Chk'd by Date App'd by Date
Net force;Fw = p Aref;
Roof load case 1 - Wind 0, GC pi 0.55, -cpe
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
A (-ve)15.00 -0.90 11.19 -14.72 678.75 -9.99
B (-ve)15.00 -0.90 11.19 -14.72 678.75 -9.99
C (-ve)15.00 -0.50 11.19 -10.91 1357.50 -14.82
D (-ve)15.00 -0.30 11.19 -9.01 1131.25 -10.19
Total vertical net force ;Fw,v = -44.99 kips
Total horizontal net force ;Fw,h = 0.00 kips
Walls load case 1 - Wind 0, GC pi 0.55, -cpe
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
A 15.00 0.80 11.19 1.46 1357.50 1.98
B 15.00 -0.50 11.19 -10.91 1357.50 -14.82
C 15.00 -0.70 11.19 -12.82 637.50 -8.17
D 15.00 -0.70 11.19 -12.82 637.50 -8.17
Overall loading
Projected vertical plan area of wall ;Avert_w_0 = b H = 1357.50 ft2
Projected vertical area of roof ;Avert_r_0 = 0.00 ft2
Minimum overall horizontal loading ;Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 21.72 kips
Leeward net force;Fl = Fw,wB = -14.8 kips
Windward net force ;Fw = Fw,wA = 2.0 kips
Overall horizontal loading ;Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 21.7 kips
Roof load case 2 - Wind 0, GC pi -0.55, -1cpe
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
A (+ve)15.00 -0.18 11.19 4.44 678.75 3.02
B (+ve)15.00 -0.18 11.19 4.44 678.75 3.02
C (+ve)15.00 -0.18 11.19 4.44 1357.50 6.03
D (+ve)15.00 -0.18 11.19 4.44 1131.25 5.03
Total vertical net force ;Fw,v = 17.09 kips
Total horizontal net force ;Fw,h = 0.00 kips
Walls load case 2 - Wind 0, GC pi -0.55, -1cpe
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
A 15.00 0.80 11.19 13.77 1357.50 18.69
B 15.00 -0.50 11.19 1.40 1357.50 1.90
22
Holmes US
523 West 6th St. Suite 1122
Los Angeles, CA 90014
Project Job Ref.
Section Sheet no./rev.
3
Calc. by
C
Date
4/29/2024
Chk'd by Date App'd by Date
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
C 15.00 -0.70 11.19 -0.50 637.50 -0.32
D 15.00 -0.70 11.19 -0.50 637.50 -0.32
Overall loading
Projected vertical plan area of wall ;Avert_w_0 = b H = 1357.50 ft2
Projected vertical area of roof ;Avert_r_0 = 0.00 ft2
Minimum overall horizontal loading ;Fw,total_min = pmin_w Avert_w_0 + pmin_r Avert_r_0 = 21.72 kips
Leeward net force;Fl = Fw,wB = 1.9 kips
Windward net force ;Fw = Fw,wA = 18.7 kips
Overall horizontal loading ;Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 21.7 kips
Roof load case 3 - Wind 90, GC pi 0.55, -cpe
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
A (-ve)15.00 -0.90 11.19 -14.72 318.75 -4.69
B (-ve)15.00 -0.90 11.19 -14.72 318.75 -4.69
C (-ve)15.00 -0.50 11.19 -10.91 637.50 -6.96
D (-ve)15.00 -0.30 11.19 -9.01 2571.25 -23.17
Total vertical net force ;Fw,v = -39.51 kips
Total horizontal net force ;Fw,h = 0.00 kips
Walls load case 3 - Wind 90, GC pi 0.55, -cpe
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
A 15.00 0.80 11.19 1.46 637.50 0.93
B 15.00 -0.29 11.19 -8.95 637.50 -5.71
C 15.00 -0.70 11.19 -12.82 1357.50 -17.40
D 15.00 -0.70 11.19 -12.82 1357.50 -17.40
Overall loading
Projected vertical plan area of wall ;Avert_w_90 = d H = 637.50 ft2
Projected vertical area of roof ;Avert_r_90 = 0.00 ft2
Minimum overall horizontal loading ;Fw,total_min = pmin_w Avert_w_90 + pmin_r Avert_r_90 = 10.20 kips
Leeward net force;Fl = Fw,wB = -5.7 kips
Windward net force ;Fw = Fw,wA = 0.9 kips
Overall horizontal loading ;Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 10.2 kips
Roof load case 4 - Wind 90, GC pi -0.55, +cpe
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
A (+ve)15.00 -0.18 11.19 4.44 318.75 1.42
23
Holmes US
523 West 6th St. Suite 1122
Los Angeles, CA 90014
Project Job Ref.
Section Sheet no./rev.
4
Calc. by
C
Date
4/29/2024
Chk'd by Date App'd by Date
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
B (+ve)15.00 -0.18 11.19 4.44 318.75 1.42
C (+ve)15.00 -0.18 11.19 4.44 637.50 2.83
D (+ve)15.00 -0.18 11.19 4.44 2571.25 11.43
Total vertical net force ;Fw,v = 17.09 kips
Total horizontal net force ;Fw,h = 0.00 kips
Walls load case 4 - Wind 90, GC pi -0.55, +cpe
Zone
Ref.
height
(ft)
Ext pressure
coefficient cpe
Peak velocity
pressure qp
(psf)
Net pressure
p
(psf)
Area
Aref
(ft2)
Net force
Fw
(kips)
A 15.00 0.80 11.19 13.77 637.50 8.78
B 15.00 -0.29 11.19 3.36 637.50 2.14
C 15.00 -0.70 11.19 -0.50 1357.50 -0.68
D 15.00 -0.70 11.19 -0.50 1357.50 -0.68
Overall loading
Projected vertical plan area of wall ;Avert_w_90 = d H = 637.50 ft2
Projected vertical area of roof ;Avert_r_90 = 0.00 ft2
Minimum overall horizontal loading ;Fw,total_min = pmin_w Avert_w_90 + pmin_r Avert_r_90 = 10.20 kips
Leeward net force;Fl = Fw,wB = 2.1 kips
Windward net force ;Fw = Fw,wA = 8.8 kips
Overall horizontal loading ;Fw,total = max(Fw - Fl + Fw,h, Fw,total_min) = 10.2 kips
24
Holmes US
523 West 6th St. Suite 1122
Los Angeles, CA 90014
Project Job Ref.
Section Sheet no./rev.
5
Calc. by
C
Date
4/29/2024
Chk'd by Date App'd by Date
25
Holmes US
523 West 6th St. Suite 1122
Los Angeles, CA 90014
Project Job Ref.
Section Sheet no./rev.
6
Calc. by
C
Date
4/29/2024
Chk'd by Date App'd by Date
26
Project:
Project No:
By:
Date:Revision:Page:
27
CYPRESS FIRE STATION
23005.10
JS/CHP
2.0
GRAVITY DESIGN
Project:
Project No:
By:
Date:Revision:Page:
28
2.1
GRAVITY LOADING PLAN
CYPRESS FIRE STATION
23005.10
JS/CHP
Holmes Structures
523 West 6th St.
Suite 1122
Los Angeles, CA
90014 USA
213 481 5630
Project:
Project No:
Sketch Title:
Sketch No:Rev:
Date:
Scale:
By:
29
CYPRESS FIRE STATION
23005.10
ROOF LOADINF PLAN
1
A3.00
1
A3.01
2
A3.00
1
2
3
A B C D E F
A 1B1
ROOF LOADING DIAGRAM
KEY LOAD SCHEDULE
DE
A
D
L
O
A
D
(
D
L
)
DE
S
I
G
N
A
T
I
O
N
1
NOTES:
1. DEAD LOAD IS A COMBINATION OF THE SELF WEIGHT OF STRUCTURE (EXCLUDES BM. WEIGHT), FLOOR FINISHES, CEILING & MEP.
ASSUMED FLOOR FINISHES ARE NOTED IN REMARKS.
2. LIVE LOADS MARKED (R) ARE REDUCIBLE IN ACCORDANCE WITH THE IBC & ASCE7.
LI
V
E
L
O
A
D
(
L
L
)
DE
S
I
G
N
A
T
I
O
N
2
MARK USE LOAD (PSF)REMARKS
1
-
ROOF
-
20 (R)
--
A ROOF 23 -
---
31B BARREL TILE ROOF
HATCH
-
LOADING DIAGRAM LEGEND
A 1
INDICATES MARK FOR LIVE LOADING - SEE DESIGNATION SCHEDULE
INDICATES MARK FOR DEAD LOADING - SEE DESIGNATION SCHEDULE
-
-
-
ROOF
-
Project:
Project No:
By:
Date:Revision:Page:
30
2.2
JOISTS
CYPRESS FIRE STATION
23005.10
JS/CHP
Project:
Project No:
By:
Date:Revision:Page:
31
2.2.1
ROOF JOISTS
CYPRESS FIRE STATION
23005.10
JS/CHP
Project:
Project No:
By:
Date:Revision:Page:
32
RJ-1:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
15 FT
2 FT
A1 (SEE LOADING PLAN IN SEC. 2.0)
1 3/4x14 LVL
CYPRESS FIRE STATION
23005.10
JS/CHP
1
3
/
4
x
1
4
L
V
L
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
2x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
HDR.
3B
CONNECT (E) TRU
(E) WALL, SEE FR
SHEET NOTE 10,
1
S2.02
S2.02
8
S2.02
(2
)
2
x
1
0
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:RJ-1
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Completely Unbraced Repetitive Member Stress Increase
Allowable Stress Design
iLevel Truss Joist
MicroLam LVL 2.0 E
2,600.0
2,600.0
2,510.0
750.0
2,000.0
1,016.54
285.0
1,555.0 42.010
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0230, Lr = 0.020 ksf, Tributary Width = 2.0 ft, (A1)
Uniform Load : W = -0.0340 ksf, Extent = 0.0 -->> 9.50 ft, Tributary Width = 2.0 ft, (Zone 3 C&C Pressure)
Uniform Load : W = -0.0280 ksf, Extent = 9.50 -->> 15.0 ft, Tributary Width = 2.0 ft, (Zone 1 C&C Pressure)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.702: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 7.500 ft
36.22 psi=
=
783.45 psi
1.75x14Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
356.25 psi==
Section used for this span 1.75x14
Maximum Shear Stress Ratio 0.102 : 1
13.850 ft=
=
549.92 psi
Maximum Deflection
1949 >=240
1050
Ratio =18469 >=180
Max Downward Transient Deflection 0.057 in 3143Ratio =>=240
Max Upward Transient Deflection -0.092 in Ratio =
Max Downward Total Deflection 0.171 in Ratio =>=180
Max Upward Total Deflection -0.010 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
Span: 1 : W Only
Span: 1 : +1.50D+Lr
Span: 1 : +0.60D+0.60W
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+Lr 1 0.1714 7.555 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.699 0.699
Max Upward from Load Combinations 0.699 0.699
Max Upward from Load Cases 0.399 0.399
Max Downward from all Load Conditio -0.498 -0.456
Max Downward from Load Combinations -0.060 -0.034
Max Downward from Load Cases (Resis -0.498 -0.456
D Only 0.399 0.399
+D+Lr 0.699 0.699
33
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:RJ-1
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
+D+0.750Lr 0.624 0.624
+D+0.60W 0.100 0.125
+D+0.750Lr+0.450W 0.400 0.418
+D+0.450W 0.175 0.193
+0.60D+0.60W -0.060 -0.034
+0.60D 0.239 0.239
Lr Only 0.300 0.300
W Only -0.498 -0.456
34
Project:
Project No:
By:
Date:Revision:Page:
35
RJ-2:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
25 FT
2 FT
A1 (SEE LOADING PLAN IN SEC. 2.0)
1 3/4x14 LVL
CYPRESS FIRE STATION
23005.10
JS/CHP
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
(
H
I
G
H
)
1
3
/
4
x
1
4
L
V
L
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
(2
)
2
x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
HDR.
8
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:RJ-2
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Beam bracing is defined as a set spacing over all spans Repetitive Member Stress Increase
Allowable Stress Design
iLevel Truss Joist
MicroLam LVL 2.0 E
2,600.0
2,600.0
2,510.0
750.0
2,000.0
1,016.54
285.0
1,555.0 42.010
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
Unbraced Lengths
First Brace starts at ft from Left-Most support
Regular spacing of lateral supports on length of beam = 6.0 ft
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0230, Lr = 0.020 ksf, Tributary Width = 2.0 ft, (A1)
Uniform Load : W = -0.0340 ksf, Extent = 0.0 -->> 9.50 ft, Tributary Width = 2.0 ft, (Zone 3 C&C Pressure)
Uniform Load : W = -0.0280 ksf, Extent = 9.250 -->> 15.50 ft, Tributary Width = 2.0 ft, (Zone 2 C&C Pressure)
Uniform Load : W = -0.0340 ksf, Extent = 15.50 -->> 25.0 ft, Tributary Width = 2.0 ft, (Zone 3 C&C Pressure)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.897: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 12.500 ft
65.04 psi=
=
1,702.41 psi
1.75x14Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
356.25 psi==
Section used for this span 1.75x14
Maximum Shear Stress Ratio 0.183 : 1
23.905 ft=
=
1,527.57 psi
Maximum Deflection
422 >=240
226
Ratio =4045 >=180
Max Downward Transient Deflection 0.442 in 678Ratio =>=240
Max Upward Transient Deflection -0.711 in Ratio =
Max Downward Total Deflection 1.322 in Ratio =>=180
Max Upward Total Deflection -0.074 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
Span: 1 : W Only
Span: 1 : +1.50D+Lr
Span: 1 : +0.60D+0.60W
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+Lr 1 1.3224 12.591 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 1.164 1.164
Max Upward from Load Combinations 1.164 1.164
Max Upward from Load Cases 0.664 0.664
Max Downward from all Load Conditio -0.823 -0.819
36
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:RJ-2
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Downward from Load Combinations -0.095 -0.093
Max Downward from Load Cases (Resis -0.823 -0.819
D Only 0.664 0.664
+D+Lr 1.164 1.164
+D+0.750Lr 1.039 1.039
+D+0.60W 0.171 0.173
+D+0.750Lr+0.450W 0.669 0.671
+D+0.450W 0.294 0.296
+0.60D+0.60W -0.095 -0.093
+0.60D 0.399 0.399
Lr Only 0.500 0.500
W Only -0.823 -0.819
37
Project:
Project No:
By:
Date:Revision:Page:
38
RJ-3:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
18.75 FT
2 FT
A1 (SEE LOADING PLAN IN SEC. 2.0)
1 3/4x14 LVL
CYPRESS FIRE STATION
23005.10
JS/CHP
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
1
3
/
4
x
1
4
L
V
L
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
2x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
4
4
.
HDR.
S2
0 DF#1
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:RJ-3
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
iLevel Truss Joist
MicroLam LVL 2.0 E
2,600.0
2,600.0
2,510.0
750.0
2,000.0
1,016.54
285.0
1,555.0 42.010
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0230, Lr = 0.020 ksf, Tributary Width = 2.0 ft, (A1)
Uniform Load : W = -0.0270 ksf, Tributary Width = 2.0 ft, (Zone 2 C&C Pressure)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.259: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 9.375 ft
46.83 psi=
=
3,322.66 psi
1.75x14Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
356.25 psi==
Section used for this span 1.75x14
Maximum Shear Stress Ratio 0.131 : 1
0.000 ft=
=
859.26 psi
Maximum Deflection
1192 >=240
537
Ratio =125866 >=180
Max Downward Transient Deflection 0.140 in 1609Ratio =>=240
Max Upward Transient Deflection -0.189 in Ratio =
Max Downward Total Deflection 0.418 in Ratio =>=180
Max Upward Total Deflection -0.002 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
Span: 1 : W Only
Span: 1 : +1.50D+Lr
Span: 1 : +0.60D+0.60W
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+Lr 1 0.4184 9.443 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.873 0.873
Max Upward from Load Combinations 0.873 0.873
Max Upward from Load Cases 0.498 0.498
Max Downward from all Load Conditio -0.506 -0.506
Max Downward from Load Combinations -0.005 -0.005
Max Downward from Load Cases (Resis -0.506 -0.506
D Only 0.498 0.498
+D+Lr 0.873 0.873
+D+0.750Lr 0.780 0.780
39
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:RJ-3
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
+D+0.60W 0.195 0.195
+D+0.750Lr+0.450W 0.552 0.552
+D+0.450W 0.270 0.270
+0.60D+0.60W -0.005 -0.005
+0.60D 0.299 0.299
Lr Only 0.375 0.375
W Only -0.506 -0.506
40
Project:
Project No:
By:
Date:Revision:Page:
41
RJ-4:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
21 FT
2 FT
A1 (SEE LOADING PLAN IN SEC. 2.0)
1 3/4x14 LVL
CYPRESS FIRE STATION
23005.10
JS/CHP
4
HDR.
S2.02
6
1'
-
0
"
4x10 DF#1
9
TCH,
SIZE
1
3
/
4
x
1
4
L
V
L
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:RJ-4
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Completely Unbraced Repetitive Member Stress Increase
Allowable Stress Design
iLevel Truss Joist
MicroLam LVL 2.0 E
2,600.0
2,600.0
2,510.0
750.0
2,000.0
1,016.54
285.0
1,555.0 42.010
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load : D = 0.0230, Lr = 0.020 ksf, Tributary Width = 2.0 ft, (A1)
Uniform Load : W = -0.0340 ksf, Extent = 0.0 -->> 9.50 ft, Tributary Width = 2.0 ft, (Zone 3 C&C Pressure)
Uniform Load : W = -0.0280 ksf, Extent = 9.50 -->> 15.0 ft, Tributary Width = 2.0 ft, (Zone 1 C&C Pressure)
Load for Span Number 2
Uniform Load : D = 0.0230, Lr = 0.020 ksf, Tributary Width = 2.0 ft, (A1)
Uniform Load : W = -0.00280 ksf, Tributary Width = 2.0 ft, (Zone 1 C&C Pressure)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.533: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 15.000 ft
44.69 psi=
=
783.45 psi
1.75x14Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
356.25 psi==
Section used for this span 1.75x14
Maximum Shear Stress Ratio 0.125 : 1
13.911 ft=
=
417.94 psi
Maximum Deflection
3337 >=240
1895
Ratio =8241 >=180
Max Downward Transient Deflection 0.032 in 5674Ratio =>=240
Max Upward Transient Deflection -0.054 in Ratio =
Max Downward Total Deflection 0.095 in Ratio =>=180
Max Upward Total Deflection -0.009 in
fb: Actual
F'b
fv: Actual
F'v
Span: 2 : W Only
Span: 2 : Lr Only
Span: 2 : +0.60D+0.60W
Span: 2 : +1.50D+Lr
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+Lr 1 0.0949 6.788 0.0000 0.000
+1.50D+Lr20.0000 6.788 -0.0087 2.313
.
Load Combination Support 1 Support 2 Support 3
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.566 1.443 0.198
Max Upward from Load Combinations 0.566 1.443 0.101
Max Upward from Load Cases 0.323 0.823 0.198
42
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:RJ-4
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Load Combination Support 1 Support 2 Support 3
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Downward from all Load Conditio -0.412 -0.773 -0.052
Max Downward from Load Combinations -0.054 -0.052
Max Downward from Load Cases (Resis -0.412 -0.773 -0.030
D Only 0.323 0.823 -0.030
+D+Lr 0.566 1.443 -0.052
+D+0.750Lr 0.505 1.288 -0.047
+D+0.60W 0.076 0.359 0.089
+D+0.750Lr+0.450W 0.320 0.940 0.042
+D+0.450W 0.137 0.475 0.059
+0.60D+0.60W -0.054 0.030 0.101
+0.60D 0.194 0.494 -0.018
Lr Only 0.243 0.619 -0.022
W Only -0.412 -0.773 0.198
43
Project:
Project No:
By:
Date:Revision:Page:
44
2.2.2
CEILING JOISTS
CYPRESS FIRE STATION
23005.10
JS/CHP
Project:
Project No:
By:
Date:Revision:Page:
45
CJ-1:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
15 FT
2 FT
SEE WEIGH-UP IN SEC. 1.4
2x10 DF NO.2
CYPRESS FIRE STATION
23005.10
JS/CHP
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
2x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
HDR
3B
CONNECT (E) TRUSSE
(E) WALL, SEE FRAMIN
SHEET NOTE 10, TYP.
(2
)
2
x
1
0
2x1
2x1
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:CJ-1
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
Douglas Fir-Larch
No.2
900.0
900.0
1,350.0
625.0
1,600.0
580.0
180.0
575.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0070 ksf, Tributary Width = 2.0 ft, (Ceiling Weight (See weigh-up))
Uniform Load : L = 0.0140 ksf, Extent = 6.250 -->> 8.750 ft, Tributary Width = 2.0 ft, (Maintenence load)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.354: 1
Load Combination +D+L
Span # where maximum occurs Span # 1
Location of maximum on span 7.500 ft
16.16 psi=
=
1,138.50 psi
2x10Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+L
=
=
=
180.00 psi==
Section used for this span 2x10
Maximum Shear Stress Ratio 0.090 : 1
14.234 ft=
=
403.33 psi
Maximum Deflection
0 <240
756
Ratio =0 <180
Max Downward Transient Deflection 0.053 in 3376Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.238 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : L Only
n/a
Span: 1 : +1.50D+L
n/a
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+L 1 0.2380 7.555 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.163 0.163
Max Upward from Load Combinations 0.163 0.163
Max Upward from Load Cases 0.128 0.128
D Only 0.128 0.128
+D+L 0.163 0.163
+D+0.750L 0.154 0.154
+0.60D 0.077 0.077
L Only 0.035 0.035
46
Project:
Project No:
By:
Date:Revision:Page:
47
CJ-2:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
25 FT
2 FT
SEE WEIGH-UP IN SEC. 1.4
(2)2x10 DF NO.2
CYPRESS FIRE STATION
23005.10
JS/CHP
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
(
H
I
G
H
)
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
(2
)
2
x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
2
S2.02
7
S2.02
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:CJ-2
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
Douglas Fir-Larch
No.2
900.0
900.0
1,350.0
625.0
1,600.0
580.0
180.0
575.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0070 ksf, Tributary Width = 2.0 ft, (Ceiling Weight (See weigh-up))
Point Load : L = 0.30 k @ 12.250 ft, (Maintenence load)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.846: 1
Load Combination +D+L
Span # where maximum occurs Span # 1
Location of maximum on span 12.226 ft
21.00 psi=
=
1,138.50 psi
2-2x10Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+L
=
=
=
180.00 psi==
Section used for this span 2-2x10
Maximum Shear Stress Ratio 0.117 : 1
0.000 ft=
=
963.08 psi
Maximum Deflection
0 <240
218
Ratio =0 <180
Max Downward Transient Deflection 0.536 in 560Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 1.374 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : L Only
n/a
Span: 1 : +1.50D+L
n/a
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+L 1 1.3740 12.500 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.403 0.397
Max Upward from Load Combinations 0.403 0.397
Max Upward from Load Cases 0.250 0.250
D Only 0.250 0.250
+D+L 0.403 0.397
+D+0.750L 0.365 0.360
+0.60D 0.150 0.150
L Only 0.153 0.147
48
Project:
Project No:
By:
Date:Revision:Page:
49
CJ-3:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
19 FT
2 FT
SEE WEIGH-UP IN SEC. 1.4
2x10 DF NO.2
CYPRESS FIRE STATION
23005.10
JS/CHP
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
1
3
/
4
x
1
4
L
V
L
J
O
I
S
T
@
2
4
"
O
.
C
.
P
L
A
C
E
D
BT
W
N
.
(
E
)
T
R
U
S
S
E
S
2x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
4
3A
HDR.HDR.
1
S2.02
1
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:CJ-3
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
Douglas Fir-Larch
No.2
900.0
900.0
1,350.0
625.0
1,600.0
580.0
180.0
575.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0070 ksf, Tributary Width = 2.0 ft, (Ceiling Weight (See weigh-up))
Uniform Load : L = 0.0140 ksf, Extent = 8.250 -->> 10.750 ft, Tributary Width = 2.0 ft, (Maintenence load)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.531: 1
Load Combination +D+L
Span # where maximum occurs Span # 1
Location of maximum on span 9.500 ft
19.85 psi=
=
1,138.50 psi
2x10Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+L
=
=
=
180.00 psi==
Section used for this span 2x10
Maximum Shear Stress Ratio 0.110 : 1
18.237 ft=
=
604.79 psi
Maximum Deflection
0 <240
390
Ratio =0 <180
Max Downward Transient Deflection 0.109 in 2094Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.584 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : L Only
n/a
Span: 1 : +1.50D+L
n/a
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+L 1 0.5842 9.569 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.197 0.197
Max Upward from Load Combinations 0.197 0.197
Max Upward from Load Cases 0.162 0.162
D Only 0.162 0.162
+D+L 0.197 0.197
+D+0.750L 0.188 0.188
+0.60D 0.097 0.097
L Only 0.035 0.035
50
Project:
Project No:
By:
Date:Revision:Page:
51
CJ-4:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
21 FT
2 FT
SEE WEIGH-UP IN SEC. 1.4
2x10 DF NO.2
CYPRESS FIRE STATION
23005.10
JS/CHP
4x10 DF#1
HDR.
4
HDR.
S2.02
6
1'
-
0
"
4x10
02
9
CEILING HATCH,
S.A.D. FOR SIZE
& LOCATION 2x
1
0
C
L
G
.
J
O
I
S
T
@
2
4
"
O
.
C
.
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:CJ-4
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
Allowable Stress Design
Douglas Fir-Larch
No.2
900.0
900.0
1,350.0
625.0
1,600.0
580.0
180.0
575.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load : D = 0.0070 ksf, Tributary Width = 2.0 ft, (Ceiling Weight (See weigh-up))
Point Load : L = 0.30 k @ 7.50 ft, (Maintenence Load)
Load for Span Number 2
Uniform Load : D = 0.0070 ksf, Tributary Width = 2.0 ft, (Ceiling Weight (See weigh-up))
Point Load : L = 0.30 k @ 3.0 ft, (Maintenence Load)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.527: 1
Load Combination +D+L
Span # where maximum occurs Span # 1
Location of maximum on span 7.458 ft
39.52 psi=
=
1,138.50 psi
2x10Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+L
=
=
=
180.00 psi==
Section used for this span 2x10
Maximum Shear Stress Ratio 0.220 : 1
15.000 ft=
=
599.52 psi
Maximum Deflection
14291 >=240
790
Ratio =5179 >=180
Max Downward Transient Deflection 0.125 in 1434Ratio =>=240
Max Upward Transient Deflection -0.005 in Ratio =
Max Downward Total Deflection 0.228 in Ratio =>=180
Max Upward Total Deflection -0.014 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : L Only
Span: 2 : L Only
Span: 1 : +1.50D+L
Span: 2 : +1.50D+L
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+L 1 0.2277 6.872 0.0000 0.000
+1.50D+L20.0000 6.872 -0.0139 1.877
.
Load Combination Support 1 Support 2 Support 3
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.207 0.727 0.033
Max Upward from Load Combinations 0.207 0.727 0.024
Max Upward from Load Cases 0.103 0.463 0.033
Max Downward from all Load Conditio -0.010
52
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:CJ-4
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Load Combination Support 1 Support 2 Support 3
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Downward from Load Combinations -0.006
Max Downward from Load Cases (Resis -0.010
D Only 0.103 0.263 -0.010
+D+L 0.207 0.727 0.024
+D+0.750L 0.181 0.611 0.016
+0.60D 0.062 0.158 -0.006
L Only 0.103 0.463 0.033
53
Project:
Project No:
By:
Date:Revision:Page:
54
2.2
BEAMS
CYPRESS FIRE STATION
23005.10
JS/CHP
Project:
Project No:
By:
Date:Revision:Page:
55
R-BM-1:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
14.25 FT
SEE ENERCALC
B1 (SEE WEIGH-UP IN SEC. 2.0)
(E) 2x6
CYPRESS FIRE STATION
23005.10
JS/CHP
(E
)
C
L
G
.
B
M
.
,
S
I
S
T
E
R
(E) HIP
(E
)
2
x
6
R
A
F
T
E
R
S
@
2
4
"
O
.
C
.
STS
3A
B
6x
1
0
CL
G
.
B
M
.
2x
6
P
O
S
T
CL
G
.
T
O
R
O
O
F
6
14
'
-
6"
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-BM-1 (EXISTING HIP BM)
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Douglas Fir-Larch
No.2
1,300.0
1,300.0
1,200.0
300.0
1,500.0
580.0
90.0
575.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Varying Uniform Load : D= 0.0310->0.0310, Lr= 0.020->0.020 ksf, Extent = 0.0 -->> 3.250 ft, Trib Width = 0.0->4.0 ft, (B1)
Load for Span Number 2
Varying Uniform Load : D= 0.0310->0.0310, Lr= 0.020->0.020 ksf, Extent = 0.0 -->> 5.0 ft, Trib Width = 0.0->3.50 ft, (B1)
Load for Span Number 3
Varying Uniform Load : D= 0.0310->0.0310, Lr= 0.020->0.020 ksf, Extent = 0.0 -->> 6.0 ft, Trib Width = 3.50->7.50 ft, (B1)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.454: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 3
Location of maximum on span 3.580 ft
97.96 psi=
=
2,112.50 psi
2.0 X 6.0Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 2=
Load Combination +D+Lr
=
=
=
112.50 psi==
Section used for this span 2.0 X 6.0
Maximum Shear Stress Ratio 0.871 : 1
5.000 ft=
=
959.42 psi
Maximum Deflection
4834 >=240
540
Ratio =1435 >=180
Max Downward Transient Deflection 0.040 in 1817Ratio =>=240
Max Upward Transient Deflection -0.012 in Ratio =
Max Downward Total Deflection 0.133 in Ratio =>=180
Max Upward Total Deflection -0.042 in
fb: Actual
F'b
fv: Actual
F'v
Span: 3 : Lr Only
Span: 2 : Lr Only
Span: 3 : +1.50D+Lr
Span: 2 : +1.50D+Lr
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+Lr 1 0.1402 0.000 0.0000 0.000
+1.50D+Lr20.0000 0.000 -0.0418 2.689
+1.50D+Lr 3 0.1331 3.277 0.0000 2.689
.
56
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-BM-1 (EXISTING HIP BM)
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Load Combination Support 1 Support 2 Support 3 Support 4
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 0.423 1.245 0.829
Max Upward from Load Combinations 0.423 1.245 0.829
Max Upward from Load Cases 0.264 0.762 0.507
D Only 0.264 0.762 0.507
+D+Lr 0.423 1.245 0.829
+D+0.750Lr 0.383 1.125 0.749
+0.60D 0.158 0.457 0.304
Lr Only 0.160 0.483 0.323
57
Project:
Project No:
By:
Date:Revision:Page:
58
R-BM-2:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
9 FT
12.30'
A1 (SEE WEIGH-UP IN SEC. 2.0)
4x10 DF NO.1
CYPRESS FIRE STATION
23005.10
JS/CHP
4x10 DF#1
HDR. HDR.
4
3C
HDR.1'
-
0
"
4x10
9
4
S2.02
5
S2.02
9
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-BM-2
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Completely Unbraced
Allowable Stress Design
Douglas Fir-Larch
No.1
1,350.0
1,350.0
925.0
625.0
1,600.0
580.0
170.0
675.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0230, Lr = 0.020 ksf, Tributary Width = 12.30 ft, (A1)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.669: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 4.500 ft
92.98 psi=
=
1,951.00 psi
4x10Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
212.50 psi==
Section used for this span 4x10
Maximum Shear Stress Ratio 0.438 : 1
8.245 ft=
=
1,304.59 psi
Maximum Deflection
0 <240
394
Ratio =0 <180
Max Downward Transient Deflection 0.099 in 1092Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.274 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
n/a
Span: 1 : +1.50D+Lr
n/a
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+Lr 1 0.2737 4.533 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 2.412 2.412
Max Upward from Load Combinations 2.412 2.412
Max Upward from Load Cases 1.305 1.305
D Only 1.305 1.305
+D+Lr 2.412 2.412
+D+0.750Lr 2.135 2.135
+0.60D 0.783 0.783
Lr Only 1.107 1.107
59
Project:
Project No:
By:
Date:Revision:Page:
60
R-BM-3:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
24.25 FT
2'
A1 (SEE WEIGH-UP IN SEC. 2.0)
5 1/4x14 PSL
CYPRESS FIRE STATION
23005.10
JS/CHP
5
1
/
4
x
1
4
P
S
L
4x10 DF#1
(E
)
T
R
U
S
S
E
S
@
2
4
"
O
.
C
.
(
H
I
G
H
)
HDR. HDR.
3C
9
4
S2.02
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-BM-3
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Completely Unbraced
Allowable Stress Design
iLevel Truss Joist
Parallam PSL 2.0E
2,900.0
2,900.0
2,900.0
750.0
2,000.0
1,016.54
290.0
2,025.0 45.070
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0230, Lr = 0.020 ksf, Tributary Width = 2.0 ft, (A1)
Point Load : D = 1.310, Lr = 1.110 k @ 5.830 ft, (R-BM-2 S1 RXN)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.366: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 6.815 ft
61.93 psi=
=
3,177.48 psi
5.25x14.0Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
362.50 psi==
Section used for this span 5.25x14.0
Maximum Shear Stress Ratio 0.171 : 1
0.000 ft=
=
1,162.89 psi
Maximum Deflection
0 <240
319
Ratio =0 <180
Max Downward Transient Deflection 0.291 in 1000Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.912 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
n/a
Span: 1 : +1.50D+Lr
n/a
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+Lr 1 0.9121 11.505 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 3.160 1.903
Max Upward from Load Combinations 3.160 1.903
Max Upward from Load Cases 1.832 1.152
D Only 1.832 1.152
+D+Lr 3.160 1.903
+D+0.750Lr 2.828 1.716
+0.60D 1.099 0.691
Lr Only 1.328 0.752
61
Project:
Project No:
By:
Date:Revision:Page:
62
R-BM-4:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
5'
12'
A1 (SEE WEIGH-UP IN SEC. 2.0)
6x8 DF NO.1
CYPRESS FIRE STATION
23005.10
JS/CHP
4x10 DF#1
HDR. HDR.
3C
S
9
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-BM-4
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Douglas Fir-Larch
No.1
1,350.0
1,350.0
925.0
625.0
1,600.0
580.0
170.0
675.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :ASCE 7-16
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0230, Lr = 0.020 ksf, Tributary Width = 12.0 ft, (A1)
Point Load : D = 1.560, Lr = 1.140 k @ 2.50 ft, (R-BM-3 S1 RXN)
Uniform Load : D = 0.010 ksf, Tributary Width = 8.250 ft, (Cripple Wall)
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.727: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 2.500 ft
90.61 psi=
=
1,687.50 psi
6x8Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
212.50 psi==
Section used for this span 6x8
Maximum Shear Stress Ratio 0.426 : 1
0.000 ft=
=
1,227.23 psi
Maximum Deflection
0 <240
689
Ratio =0 <180
Max Downward Transient Deflection 0.028 in 2170Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.087 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
n/a
Span: 1 : +1.50D+Lr
n/a
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+Lr 1 0.0871 2.518 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 2.869 2.869
Max Upward from Load Combinations 2.869 2.869
Max Upward from Load Cases 1.699 1.699
D Only 1.699 1.699
+D+Lr 2.869 2.869
+D+0.750Lr 2.576 2.576
+0.60D 1.019 1.019
Lr Only 1.170 1.170
63
Project:
Project No:
By:
Date:Revision:Page:
64
C-BM-1:
SPAN:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
15'
2'
SEE WEIGH-UP IN SEC. 1.4
6x10 DF NO.2
CYPRESS FIRE STATION
23005.10
JS/CHP
(E
)
C
L
G
.
B
M
.
,
S
I
S
T
E
R
W/
(
2
)
1
3
/
4
x
1
4
L
V
L
(E) H
I
P
(E) HIP
(E
)
2
x
6
R
A
F
T
E
R
S
@
2
4
"
O
.
C
.
(E
)
2
x
6
R
A
F
T
E
R
S
@
2
4
"
O
.
C
.
S
3A
6x
1
0
CL
G
.
B
M
.
2x
6
P
O
S
T
CL
G
.
T
O
R
O
O
F
6
14
'
-
6"
Wood Beam
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:C-BM-1
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : IBC 2021
Material Properties
Beam Bracing :Beam is Fully Braced against lateral-torsional buckling
Allowable Stress Design
Douglas Fir-Larch
No.2
900.0
900.0
1,350.0
625.0
1,600.0
580.0
180.0
575.0 31.210
Analysis Method :
Eminbend - xx ksi
Wood Species :
Wood Grade :
Fb +
psi
psi
Fv psi
Fb -
Ft psi
Fc - Prll psi
psiFc - Perp
E : Modulus of Elasticity
Ebend- xx ksi
Density pcf
Load Combination :IBC 2021
.Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load : D = 0.0070 ksf, Tributary Width = 2.0 ft, (Ceiling Load)
Point Load : D = 0.760, Lr = 0.480 k @ 3.50 ft, (R-BM-1 S4 RXN (x4))
Point Load : D = 0.760, Lr = 0.480 k @ 11.50 ft, (R-BM-1 S4 RXN (x4))
.DESIGN SUMMARY Design OK
Maximum Bending Stress Ratio 0.651: 1
Load Combination +D+Lr
Span # where maximum occurs Span # 1
Location of maximum on span 7.500 ft
40.49 psi=
=
1,125.00 psi
6x10Section used for this span
Span # where maximum occurs
Location of maximum on span
Span # 1=
Load Combination +D+Lr
=
=
=
225.00 psi==
Section used for this span 6x10
Maximum Shear Stress Ratio 0.180 : 1
14.234 ft=
=
732.84 psi
Maximum Deflection
0 <240
376
Ratio =0 <180
Max Downward Transient Deflection 0.121 in 1485Ratio =>=240
Max Upward Transient Deflection 0 in Ratio =
Max Downward Total Deflection 0.478 in Ratio =>=180
Max Upward Total Deflection 0 in
fb: Actual
F'b
fv: Actual
F'v
Span: 1 : Lr Only
n/a
Span: 1 : +1.50D+Lr
n/a
.
Location in SpanLoad CombinationMax. "-" Defl Location in SpanLoad Combination Span Max. "+" Defl
Overall Maximum Deflections
+1.50D+Lr 1 0.4781 7.555 0.0000 0.000
.
Load Combination Support 1 Support 2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Max Upward from all Load Conditions 1.430 1.430
Max Upward from Load Combinations 1.430 1.430
Max Upward from Load Cases 0.950 0.950
D Only 0.950 0.950
+D+Lr 1.430 1.430
+D+0.750Lr 1.310 1.310
+0.60D 0.570 0.570
Lr Only 0.480 0.480
65
Project:
Project No:
By:
Date:Revision:Page:
66
CYPRESS FIRE STATION
23005.10
JS/CHP
2.4
COLUMN DESIGN
Project:
Project No:
By:
Date:Revision:Page:
67
C-COL-1:
HEIGHT:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
5 FT
-
B1 (SEE LOADING PLAN IN SEC. 2.0)
2x6
CYPRESS FIRE STATION
23005.10
JS/CHP
(E
)
C
L
G
.
B
M
W
/
(
2
)
1
3
/
4
x
(E) H
I
P
(E
)
2
x
6
@
2
4
"
(E
)
2
x
6
R
A
F
T
E
R
S
@
2
4
"
O
.
C
.
6x
1
0
CL
G
.
B
M
.
6x
1
0
C
L
G
.
B
M
.
2x
6
P
O
S
T
CL
G
.
T
O
R
O
O
F
6
14
'
-
6"
Wood Column
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:C-COL-1
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
.Code References
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : IBC 2021
General Information
Wood Section Name 2x6Analysis Method :
5Overall Column Height ft
Allowable Stress Design
( Used for non-slender calculations )Allow Stress Modification Factors
End Fixities Top & Bottom Pinned
Wood Species Douglas Fir-Larch
Wood Grade Construction
Fb +1,000.0
1,000.0 psi
1,650.0
625.0
180.0
650.0
31.210
psi Fv psi
Fb -Ft psi
Fc - Prll psi
psi
Density pcf
Fc - Perp
E : Modulus of Elasticity . . .
1,500.0
550.0
1,500.0
550.0
Cfu : Flat Use Factor 1.0
Cf or Cv for Tension 1.0
Use Cr : Repetitive ?
Kf : Built-up columns 1.0 NDS 15.3.2
Exact Width 1.50 in
Exact Depth 5.50 in
Area 8.250 in^2
Ix 20.797 in^4
Iy 1.547 in^4
Wood Grading/Manuf.Graded Lumber
Wood Member Type Sawn
Ct : Temperature Factor 1.0
Cf or Cv for Compression 1.0
1,500.0
Axial
Cm : Wet Use Factor 1.0
Cf or Cv for Bending 1.0
x-x Bending y-y Bending
ksi No
Minimum
Basic
Y-Y (depth) axis :
X-X (width) axis :
Unbraced Length for buckling ABOUT X-X Axis = 5 ft, K = 1.0
Unbraced Length for buckling ABOUT Y-Y Axis = 5 ft, K = 1.0
Brace condition for deflection (buckling) along columns :
.Service loads entered. Load Factors will be applied for calculations.Applied Loads
Column self weight included : 8.940 lbs * Dead Load Factor
AXIAL LOADS . . .
R-BM-1 RXN: Axial Load at 5.0 ft, D = 0.760, Lr = 0.480 k
.DESIGN SUMMARY
PASS
PASS
Max. Axial+Bending Stress Ratio =0.5522
Location of max.above base 0.0 ft
Applied Axial 1.249 k
Applied Mx 0.0 k-ft
Load Combination +D+Lr
Load Combination +0.60D
Bending & Shear Check Results
Maximum Shear Stress Ratio =
Applied Design Shear 0.0 psi
288.0Allowable Shear psi
0.0 : 1 Bending Compression Tension
Location of max.above base 5.0 ft
: 1
At maximum location values are . . .
Applied My 0.0 k-ft
Maximum SERVICE Lateral Load Reactions . .
Top along Y-Y 0.0 k Bottom along Y-Y 0.0 k
Top along X-X 0.0 k Bottom along X-X 0.0 kGoverning NDS Forumla Comp Only, fc/Fc'
Maximum SERVICE Load Lateral Deflections . . .
Along Y-Y 0.0 in at 0.0 ft above base
for load combination :n/a
Along X-X 0.0 in at 0.0 ft above base
Fc : Allowable 274.157 psi
Other Factors used to calculate allowable stresses . . .
for load combination :n/a
.
Maximum Axial + Bending Stress Ratios Maximum Shear RatiosCDCLoad Combination Stress Ratio Location Stress Ratio Status LocationPStatus
Load Combination Results
D Only 0.900 PASS PASS0.0 0.0 5.0 ft0.182 ft0.3446
+D+Lr 1.250 PASS PASS0.0 0.0 5.0 ft0.133 ft0.5522
+D+0.750Lr 1.250 PASS PASS0.0 0.0 5.0 ft0.133 ft0.4991
+0.60D 1.600 PASS PASS0.0 0.0 5.0 ft0.105 ft0.2025
.
k k-ft
Note: Only non-zero reactions are listed.
Load Combination
X-X Axis Reaction Y-Y Axis Reaction Axial Reaction
@ Base @ Top @ Base@ Base @ Top
Maximum Reactions
@ Base @ Base@ Top @ Top
My - End Moments Mx - End Moments
D Only 0.769
+D+Lr 1.249
+D+0.750Lr 1.129
68
Wood Column
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:C-COL-1
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
k k-ft
Note: Only non-zero reactions are listed.
Load Combination
X-X Axis Reaction Y-Y Axis Reaction Axial Reaction
@ Base @ Top @ Base@ Base @ Top
Maximum Reactions
@ Base @ Base@ Top @ Top
My - End Moments Mx - End Moments
+0.60D 0.461
Lr Only 0.480
.Sketches
69
Project:
Project No:
By:
Date:Revision:Page:
70
C-COL-2:
HEIGHT:
TRIB WIDTH:
FLOOR LOADING:
SIZE:
15 FT
-
A1 (SEE LOADING PLAN IN SEC. 2.0)
6x6
CYPRESS FIRE STATION
23005.10
JS/CHP
6x6
2A
F-25
SF-
5
4
S2.01
4x4
4
S2.01
Wood Column
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:C-COL-2
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
.Code References
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Wood Section Name 6x6Analysis Method :
15Overall Column Height ft
Allowable Stress Design
( Used for non-slender calculations )Allow Stress Modification Factors
End Fixities Top & Bottom Pinned
Wood Species Douglas Fir-Larch
Wood Grade Construction
Fb +1,000.0
1,000.0 psi
1,650.0
625.0
180.0
650.0
31.210
psi Fv psi
Fb -Ft psi
Fc - Prll psi
psi
Density pcf
Fc - Perp
E : Modulus of Elasticity . . .
1,500.0
550.0
1,500.0
550.0
Cfu : Flat Use Factor 1.0
Cf or Cv for Tension 1.0
Use Cr : Repetitive ?
Kf : Built-up columns 1.0 NDS 15.3.2
Exact Width 5.50 in
Exact Depth 5.50 in
Area 30.250 in^2
Ix 76.255 in^4
Iy 76.255 in^4
Wood Grading/Manuf.Graded Lumber
Wood Member Type Sawn
Ct : Temperature Factor 1.0
Cf or Cv for Compression 1.0
1,500.0
Axial
Cm : Wet Use Factor 1.0
Cf or Cv for Bending 1.0
x-x Bending y-y Bending
ksi No
Minimum
Basic
Y-Y (depth) axis :
X-X (width) axis :
Unbraced Length for buckling ABOUT X-X Axis = 10 ft, K = 1.0
Unbraced Length for buckling ABOUT Y-Y Axis = 10 ft, K = 1.0
Brace condition for deflection (buckling) along columns :
.Service loads entered. Load Factors will be applied for calculations.Applied Loads
Column self weight included : 98.344 lbs * Dead Load Factor
AXIAL LOADS . . .
R-BM-2 RXN: Axial Load at 10.0 ft, D = 1.310, Lr = 1.110 k
HDR RXN: Axial Load at 10.0 ft, D = 0.5210, Lr = 0.3750 k
BENDING LOADS . . .
GL-D DRAG RXN: Lat. Point Load at 15.0 ft creating Mx-x, E = 5.570 k
.DESIGN SUMMARY
PASS
PASS
Max. Axial+Bending Stress Ratio =0.1350
Location of max.above base 0.0 ft
Applied Axial 3.414 k
Applied Mx 0.0 k-ft
Load Combination +D+Lr
Load Combination +0.60D+0.70E
Bending & Shear Check Results
Maximum Shear Stress Ratio =
Applied Design Shear 0.0 psi
288.0Allowable Shear psi
0.0 : 1 Bending Compression Tension
Location of max.above base 15.0 ft
: 1
At maximum location values are . . .
Applied My 0.0 k-ft
Maximum SERVICE Lateral Load Reactions . .
Top along Y-Y 0.0 k Bottom along Y-Y 0.0 k
Top along X-X 0.0 k Bottom along X-X 0.0 kGoverning NDS Forumla Comp Only, fc/Fc'
Maximum SERVICE Load Lateral Deflections . . .
Along Y-Y 0.0 in at 0.0 ft above base
for load combination :n/a
Along X-X 0.0 in at 0.0 ft above base
Fc : Allowable 835.82 psi
Other Factors used to calculate allowable stresses . . .
for load combination :n/a
.
Maximum Axial + Bending Stress Ratios Maximum Shear RatiosCDCLoad Combination Stress Ratio Location Stress Ratio Status LocationPStatus
Load Combination Results
D Only 0.900 PASS PASS0.0 0.0 15.0 ft0.524 ft0.08195
+D+Lr 1.250 PASS PASS0.0 0.0 15.0 ft0.405 ft0.1350
+D+0.750Lr 1.250 PASS PASS0.0 0.0 15.0 ft0.405 ft0.1204
+0.60D 1.600 PASS PASS0.0 0.0 15.0 ft0.328 ft0.04422
+D+0.70E 1.600 PASS PASS0.0 0.0 15.0 ft0.328 ft0.07371
+D+0.5250E 1.600 PASS PASS0.0 0.0 15.0 ft0.328 ft0.07371
+0.60D+0.70E 1.600 PASS PASS0.0 0.0 15.0 ft0.328 ft0.04422
.
71
Wood Column
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:C-COL-2
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
k k-ft
Note: Only non-zero reactions are listed.
Load Combination
X-X Axis Reaction Y-Y Axis Reaction Axial Reaction
@ Base @ Top @ Base@ Base @ Top
Maximum Reactions
@ Base @ Base@ Top @ Top
My - End Moments Mx - End Moments
D Only 1.929
+D+Lr 3.414
+D+0.750Lr 3.043
+0.60D 1.158
+D+0.70E 1.929
+D+0.5250E 1.929
+0.60D+0.70E 1.158
Lr Only 1.485
E Only
.Sketches
72
Project:
Project No:
By:
Date:Revision:Page:
73
CYPRESS FIRE STATION
23005.10
JS/CHP
3.0
LATERAL DESIGN
Project:
Project No:
By:
Date:Revision:Page:
74
3.1
SEISMIC AND WIND LOADING COMPARISON
CYPRESS FIRE STATION
23005.10
JS/CHP
Project:
Project No:
By:
Date:Revision:Page:
75
SEISMIC vs. WIND BASE SHEAR COMPARISON:
CYPRESS FIRE STATION
23005.10
JS/CHP
- FROM SEC. 1.5, SEISMIC BASE SHEAR, Vs = 16 kips
- PER APP. CD OF ASCE 7-16, BUILDINGS WITH FLEXIBLE DIAPHRAGMS ARE EXEMPT OF THE
TORSIONAL LOAD CASES 2 & 4 AS DEFINED IN FIGURE 27.3-8.
FROM SEC. 1.6, TOTAL WIND DEMAND IS THE MAX OF LC 1 OR 3.
THEREFORE V = MAX(21.7 kips, 10.2 kips) = 21.7 kips
THEREFORE WIND BASE SHEAR, Vw = 21.7 kips / 2 = 10.85 kips
- Vs > Vw, THEREFORE SEISMIC BASE SHEAR GOVERNS DESIGN
Project:
Project No:
By:
Date:Revision:Page:
76
3.2
SHEAR WALLS
CYPRESS FIRE STATION
23005.10
JS/CHP
Project:
Project No:
By:
Date:Revision:Page:
77
3.2.1
NORTH/SOUTH SHEAR WALL DESIGN
CYPRESS FIRE STATION
23005.10
JS/CHP
Holmes Structures
523 West 6th St.
Suite 1122
Los Angeles, CA
90014 USA
213 481 5630
Project:
Project No:
Sketch Title:
Sketch No:Rev:
Date:
Scale:
By:
78
CYPRESS FIRE STATION
23005.10
N/S SW KEYPLAN N.T.S
NORTH/SOUTH SHEARWALLS - KEY PLAN
REF.
T
FC
-2
T
FC
-4
TFC-3
T FC-1
T FC-5
A2.01
2
1
A3.00
1
A3.01
A2.00 4
2
A3.01
2
A3.00
1
2
3
A B C D E F
A4.00
1
8"
15
'
-
8
"
25
'
-
0
"
1'
-
3
"
42
'
-
7
"
1"7' - 1"18' - 0"22' - 6"23' - 7"18' - 6"7"
90' - 4"
10' - 9"
1033 SF
MULTI-PURPOSE
ROOM A
02
212 SF
ENTRY / CHECK
IN OFFICE
01 348 SF
MULTI-PURPOSE
ROOM B
03
HALLWAY
04
375 SF
MULTI-PURPOSE
ROOM C
05
HALLWAY
06
WOMENS
07
MENS
09
343 SF
OFFICE AND
KITCHEN
10
RESTROOM
11
JANITOR
12
03
02
01
12
04
05
14
16
18
17
07
20
21
13
15
19
24 23 22 21 20 18
9
8
1514
13121165432710
25
16
1
A4.01
1
A4.01
A.
B.
C.
D.
A4.02
A.
B.
C.
D.
A4.03
A
B
C
D
A4.04
A
B
C
D
A4.02
A
B
C
D
A4.04
A.
B.
C.
D.
A4.02
A
B
C
D
26-01ALIGNALIGNALIGN
08-02 08-02
08-03
08-05
08-05
08-04
08-0108-0108-01 08-01
32
32-07
05-02
06-01
06-01
06-01
17
07-07
07-05
07-07
07-06 07-06
09-02
09-01
09-02
09-02
2
A1.00
10
'
-
2
"
09
-01
.06-02
3
A1.00
TYP.
02-04
TYP.
02-04 TYP.
02-04 TYP.
02-04
TYP.
02-04
08-06
A2.01
11
1' - 0"
SH
E
A
R
W
A
L
L
WA
L
L
D
E
P
T
H
A
S
RE
Q
U
I
R
E
D
F
O
R
26-02
CLR.
3'-0" MIN
23-03
6' - 11 7/8"
06-01
19.1
5'-2"
619 sf
1
470 sf 837 sf 1,543 sf
2
3
B DB.4
R-
B
.
4
.
1
R-
D
.
1
HDU
HDU
HDU
HDU
13
'
-
6
"
SW
17
'
-
0
"
SW
R-
B
.
1
R-
B
.
2
WS
W
H
1
8
x
1
4
WS
W
H
1
8
x
1
4
8'
-
0
"
SW
F
R-
F
.
1
HDU
HDU
Project:
No:
By:
Date: Page:
N/S SHEAR WALL DESIGN
Wall Capacities
Allowable
Shear
Shear
Stiffness
va (plf)Ga (k/in)
0
6"1 286 14 0.92
4"1 424 17
3"1 552 19
2"1 708 23
(2) 4"2 848 28
(2) 3"2 1104 34
(2) 2"2 1416 38
Level R Wall Design
Wall
Length, b
Wall
Height, hi
Seismic
Force
Add.
Seismic
Force
Total
Seismic
Force, Vi
Seismic
Demand
Allowable
Shear
Simpson
Wall
Capacity
ft ft lbs lbs lbs plf va (plf)lb
B.4 R-B.4.1 13.50 15.00 2640 2640 196 - 4" 1.0 424 -0.46
D R-D.1 17.00 15.00 4866 4866 286 - 4" 1.0 424 -0.68
B R-B.1 1.33 14.00 741 741 557 WSWH18x14 - - - 1180 0.63
B R-B.2 1.33 14.00 741 741 557 WSWH18x14 - - - 1180 0.63
F R-F.1 8.00 15.00 1952 1952 244 6" 1.0 286 -0.85
Total: 10940 0 10940
Wall
Nailing
Type
Wall Line Wall ID 2L/
Hw
D/C
Select
Simpson
Wall Size /
Other
T4.3A
footnote 10
Reduction
Factor
Req'd
Wall
Type
Manual
Wall
Selection
# of Sides
Sheathed
Note: Default values va based on converting AWC SDPWS Table
4.3A values to vs to ASD, for 1/2" CD-X Sheathing w/ 10d
common or box nails. Values have been further reduced by a
capcity factor noted in NDS Table 4.3A footnote 10.
5/13/24
CHP/JS
23005.10
Cypress Fire Station
79
Project:
No:
By:
Date: Page:
N/S SEISMIC ρ VALUE N/S Weak Story Check
ASCE 7-16 Section 12.3.4.2 SDPWS Section 4.1.8
Level
R 17.575 -
ρ req'd = 1.0 - - -
Use ρ =1.0 - - -
Level R Wall Design
Total
Seismic
Wall
Length, L
Wall
Height,
Hw
Ga Bending Shear ∆a Total Cumulative
Total
lbs ft ft in in in in in
B.4 - R-B.4.1 2640 13.50 15.00 1.11 24% 1.0 17 0.012 0.246 0.072 0.33
D - R-D.1 4866 17.00 15.00 0.88 wall ok 1.0 17 0.013 0.361 0.100 0.47
B - R-B.1 741 1.33 14.00 10.53 7% 1.0 - - - -0.45
B - R-B.2 741 1.33 14.00 10.53 7% 1.0 - - - -0.45
F - R-F.1 1952 8.00 15.00 1.88 18% 1.0 14 0.024 0.373 0.196 0.59
99%
Story Strength
(Kips)
ρ = 1.0 if shear walls with height/ width ratios greater than 1.0 do not
have more than 33% of the overall story shear for stories that resist >
35%.
Deflection Calculations
H/L % of F ρ
Wall Line
-
Wall ID
Redundancy Factor Check
Cypress Fire Station
23005.10
CHP/JS
5/13/24
80
Project:
No:
By:
Date: Page:
Wall Forces Simpson Strong-Tie HDU Holdowns General Info
Le
v
e
l
Wall
Height, h ρFx (ASD)Holdown Capacity
(lbs)
Min. Post
Size.
Deflect. At
Allow. Load
(in)
- -
R 14.60 ft 11.0 kips Min. HD 0 Epost 1,600 ksi
G 0.00 ft 0.0 kips HDU2 3075 4x4 0.088 Ecol 29,000 ksi
0 0.00 ft 0.0 kips HDU4 4565 4x4 0.114 Fc⊥625 psi
0 HDU5 5645 4x4 0.115 Shrinkage 0.033
HDU8 6970 4x4 0.116
Wall Weights HDU11 9535 4x6 0.137
Ext. 20 psf HDU14 14445 6x6 0.172
Int. 10 psf 2-HDU11 19070 6x8 0.137
Misc. 15 psf 2-HDU14 28890 6x10 0.172
Misc. 15 psf HSS5x5x1/4 50000 HSS5x5x1/4
N/S Holdown/Post Design Level R
OTM
(Vihi)
Total
OTM
(Vihi)
Uplift Wall Dead
Load
Other
Dead
Load
Max
Tension
Max
Comp Ft Fc Fc Fc⊥Fc⊥
k-ft k-ft lbs plf plf lbs lbs lbs lbs D/C comp lbs D/C comp
B.4 - R-B.4.1 39.6 NA 39.6 3046 150 2566 4249 -HDU5 5645 0.45 4x4 -6x6 13751 0.31 18906 0.22
D - R-D.1 73.0 NA 73.0 4424 150 3825 5927 -HDU4 4565 0.84 4x4 -6x6 13751 0.43 18906 0.31
B - R-B.1 10.4 NA 10.4 9961 280 9852 -WSWH18x14 15890 -------
B - R-B.2 10.4 NA 10.4 9961 280 9852 -WSWH18x14 15890 -------
F - R-F.1 29.3 NA 29.3 3904 300 3321 5369 -HDU4 4565 0.73 4x4 -6x6 13751 0.39 18906 0.28
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
D/C
tension
Manual Post
Size
Min Post
Size for
HDU
Line + ID Wall
Above
Calculated
Hold Down
Manual HD
Selection
Calculated
Post Size
City of LA
project?No
Cypress Fire Station
23005.10
CHP/JS
5/13/24
81
Project:
Project No:
By:
Date:Revision:Page:
82
3.2.2
EAST/WEST SHEAR WALL DESIGN
CYPRESS FIRE STATION
23005.10
JS/CHP
Holmes Structures
523 West 6th St.
Suite 1122
Los Angeles, CA
90014 USA
213 481 5630
Project:
Project No:
Sketch Title:
Sketch No:Rev:
Date:
Scale:
By:
83
CYPRESS FIRE STATION
23005.10
E/W SW KEYPLAN N.T.S
EAST/WEST SHEARWALLS - KEY PLAN
REF.
16
'
-
7
"
25
'
-
0
"
1'
-
0
"
11"17' - 11"53' - 7"18' - 2"
1036 SF
MULTI-PURPOSE
ROOM A
02
213 SF
ENTRY / CHECK
IN OFFICE
01
348 SF
MULTI-PURPOSE
ROOM B
03
HALLWAY
04
375 SF
MULTI-PURPOSE
ROOM C
05
HALLWAY
06
WOMENS
07
MENS
09
343 SF
OFFICE AND
KITCHEN
10
RESTROOM
11
JANITOR
12
4'
-
0
"
1
C
R
A2.01
2
1
A3.00
1
A3.01
03
02
01
08
07
04
05
10
12
14
13
06
16
17
09
11
15
24 23 22 21 20 19 18
17
15
14
1312
111096543278
25
16
27
1
2
A3.01
A2.01
1
2
A3.00
1
2
3
A B C D E F
8"
599 sf
1,175 sf
1,711 sf
1
2
3
B EB.4
R-3.1 R-3.2
R-2.1
R-1.2
HDUHDU
5'-3"
SW
HDUHDU
21'-4"
SW
HDUHDU
6'-6"
SW
HDUHDU
5'-4"
SW
R-1.3
HDUHDU
5'-3"
SW
R-1.1
HDUHDU
6'-4"
SW
F
E/W SHEAR WALL LINE ANALYSIS
Building Total Seismic Forces
Where:
R ρ =
G SDS =
Total:
Seismic Forces per wall line
Note: Forces distributed based on Tributary Areas (Flexible Diaphragm, zero torsion)
Total:
Area Check: OK100%
0
0
0
0
0
00
0
0
0 0
0
0
0
0
0
0 0
0
3485
1711 5396
Line Trib
Area
Force to Line -
From Level
By:
3488 11000 3.15
Le
v
e
l
A
Distance 1
Page:
1.000%
Shear Wall
Line
ρFx v
ft2 lbs lb/ft2
No:
Level: R Transfer Shear Wall
11000
23005.10
1.03
Design
Proceedure
Distance 2 Line 2
Belowft2lbs
ASD
lbs
CHP/JS
Date:5/7/24
Error
%
1889
0
ft ft
Total
Force to
Line
0
0
0
0%
10991 10991
0
0
00
0
0
3706
5396
Line Below Line 1
Below
Cypress Fire Station
2
Project:
1 1175 3706 1
3 599 1889
2
0
0
3
0
0
0
84
Project:
No:
By:
Date: Page:
E/W SHEAR WALL DESIGN
Wall Capacities
Allowable
Shear
Shear
Stiffness
va (plf)Ga (k/in)
0
6"1 286 14 0.92
4"1 424 17
3"1 552 19
2"1 708 23
(2) 4"2 848 28
(2) 3"2 1104 34
(2) 2"2 1416 38
Level R Wall Design
Wall
Length, b
Wall
Height,
hi
Seismic
Force
Add.
Seismic
Force
Total
Seismic
Force, Vi
Seismic
Demand
Allowable
Shear
Simpson
Wall
Capacity
ft ft lbs lbs lbs plf va (plf)lb
1 R-1.1 6.33 16.00 1394 1394 220 6"4"0.9 396 -0.56
1 R-1.2 5.25 16.00 1156 1156 220 6"4"0.9 368 -0.60
1 R-1.3 5.25 16.00 1156 1156 220 6"4"0.9 368 -0.60
2 R-2.1 21.50 15.00 5396 5396 251 6"4"1.0 424 -0.59
3 R-3.1 6.50 16.00 1038 1038 160 6" 0.9 269 -0.59
3 R-3.2 5.33 16.00 851 851 160 6" 0.9 250 -0.64
Total: 10991 0 10991
2L/
Hw
D/C
Cypress Fire Station
23005.10
CHP/JS
5/7/24
Wall
Nailing
Type
# of
Sides
Sheathe
d
Note: Default values va based on converting AWC SDPWS Table
4.3A values to vs to ASD, for 1/2" CD-X Sheathing w/ 10d
common or box nails. Values have been further reduced by a
capcity factor noted in NDS Table 4.3A footnote 10.
T4.3A
footnote 10
Reduction
Factor
Wall Line Wall ID
Select
Simpson
Wall Size /
Other
Req'd
Wall
Type
Manual
Wall
Selection
85
Project:
No:
By:
Date: Page:
E/W SEISMIC ρ VALUE E/W Weak Story Check
ASCE 7-16 Section 12.3.4.2 SDPWS Section 4.1.8
Level
R 18.5704 -
ρ req'd =1.0 ---
Use ρ =1.0 ---
Level R Wall Design
Total
Seismic
Wall
Length, L
Wall
Height,
Hw
Ga Bending Shear ∆a Total Cumulative
Total
lbs ft ft in in in in in
1 - R-1.1 1394 6.33 16.00 2.53 13% 1.0 17 0.034 0.296 0.270 0.60
1 - R-1.2 1156 5.25 16.00 3.05 11% 1.0 17 0.041 0.296 0.320 0.66
1 - R-1.3 1156 5.25 16.00 3.05 11% 1.0 17 0.041 0.296 0.232 0.57
2 - R-2.1 5396 21.50 15.00 0.70 wall ok 1.0 17 0.009 0.316 0.065 0.39
3 - R-3.1 1038 6.50 16.00 2.46 9% 1.0 14 0.024 0.261 0.181 0.47
3 - R-3.2 851 5.33 16.00 3.00 8% 1.0 14 0.029 0.261 0.238 0.53
100%
ρ
Story Strength
(Kips)
ρ = 1.0 if shear walls with height/ width ratios greater than 1.0 do not
have more than 33% of the overall story shear for stories that resist >
35%.
Deflection Calculations
Redundancy Factor Check
Cypress Fire Station
23005.10
CHP/JS
5/7/24
% of F
Wall Line
-
Wall ID
H/L
86
Project:
No:
By:
Date: Page:
Wall Forces Simpson Strong-Tie HDU Holdowns General Info
Le
v
e
l
Wall
Height, h ρFx (ASD)Holdown Capacity
(lbs)
Min. Post
Size.
Deflect. At
Allow. Load
(in)
- -
R 15.83 ft 11.0 kips Min. HD 0 Epost 1,600 ksi
G 0.00 ft 0.0 kips HDU2 3075 4x4 0.088 Ecol 29,000.0 ksi
0 0.00 ft 0.0 kips HDU4 4565 4x4 0.114 F'c⊥625 psi
0 HDU5 5645 4x4 0.115 Shrinkage 0.033495
HDU8 6970 4x4 0.116
Wall Weights HDU11 9535 4x6 0.137
Ext. 20 psf HDU14 14445 6x6 0.172
Int. 10 psf 2-HDU11 19070 6x8 0.137
Misc. 15 psf 2-HDU14 28890 6x10 0.172
Misc. 15 psf HSS5x5x1/4 76300 HSS5x5x1/4
E/W Holdown/Post Design Level R
OTM
(Vihi)
Total
OTM
(Vihi)
Uplift Wall Dead
Load
Other
Dead
Load
Max
Tension
Max
Comp Ft Fc Fc Fc⊥Fc⊥
k-ft k-ft lbs plf plf lbs lbs lbs lbs D/C comp lbs D/C comp
1 - R-1.1 22.3 NA 22.3 3825 320 3324 5083 -HDU4 4565 0.73 4x4 6x6 12161 0.42 18906 0.27
1 - R-1.2 18.5 NA 18.5 3894 320 3470 4956 -HDU4 4565 0.76 4x4 6x6 12161 0.41 18906 0.26
1 - R-1.3 18.5 NA 18.5 3894 320 3470 4956 -HDU4 4565 0.76 4x4 6x6 12161 0.41 18906 0.26
2 - R-2.1 80.9 NA 80.9 3854 150 3102 5743 -HDU4 4565 0.68 4x4 6x6 13751 0.42 18906 0.30
3 - R-3.1 16.6 NA 16.6 2768 320 2254 4057 -HDU4 4565 0.49 4x4 6x6 12161 0.33 18906 0.21
3 - R-3.2 13.6 NA 13.6 2819 320 2390 3896 -HDU4 4565 0.52 4x4 6x6 12161 0.32 18906 0.21
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Manual
Post Size
Min Post
Size for
HDU
Line + ID Wall
Above
Calculated
Hold Down
Manual HD
Selection
D/C
tension
City of LA
project?No
Cypress Fire Station
23005.10
CHP/JS
5/7/24
87
Project:
Project No:
By:
Date:Revision:Page:
88
3.3
DIAPHRAGM DESIGN
CYPRESS FIRE STATION
23005.10
JS/CHP
Project:
Project No:
By:
Date:Revision:Page:
89
3.3.1
NORTH/SOUTH DIAPHRAGM DESIGN
CYPRESS FIRE STATION
23005.10
JS/CHP
General Beam Analysis
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:N/S Diaphragm
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
General Beam Properties
Elastic Modulus ksi29,000.0
100.0Span #1 in^4Area =in^2 Moment of Inertia =Span Length =10.07.10 ft
100.0Span #2 in^4Area =in^2 Moment of Inertia =Span Length =10.07.50 ft
100.0Span #3 in^4Area =in^2 Moment of Inertia =Span Length =10.032.830 ft
100.0Span #4 in^4Area =in^2 Moment of Inertia =Span Length =10.041.20 ft
.Service loads entered. Load Factors will be applied for calculations.Applied Loads
Load for Span Number 1
Uniform Load : E = 0.210 k/ft, Tributary Width = 1.0 ft, (EQ (19k / 90.58'))
Load for Span Number 2
Uniform Load : E = 0.210 k/ft, Tributary Width = 1.0 ft, (EQ (19k / 90.58'))
Load for Span Number 3
Uniform Load : E = 0.210 k/ft, Tributary Width = 1.0 ft, (EQ (19k / 90.58'))
Load for Span Number 4
Uniform Load : E = 0.210 k/ft, Tributary Width = 1.0 ft, (EQ (19k / 90.58'))
.DESIGN SUMMARY
Maximum Bending =
Load Combination E Only * 0.70
Span # where maximum occurs Span # 3
Location of maximum on span 32.830 ft
3.631 k
Span # where maximum occurs
Location of maximum on span
Span # 3
Load Combination E Only * 0.70
Maximum Shear =
32.830 ft
24.842 k-ft
Maximum Deflection
Max Downward Transient Deflection 2.523 in 195
Max Upward Transient Deflection -0.150 in 2621
Max Downward Total Deflection 1.766 in 279
Max Upward Total Deflection -0.105 in 3745
.
Load Combination Support 1 Support 2 Support 3 Support 4 Support 5
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Overall MAXimum 3.4653.8191.868 9.461
Overall MINimum
E Only * 0.70 2.4252.6731.308 6.622
E Only * 0.5250 1.8192.0050.981 4.967
E Only 3.4653.8191.868 9.461
90
GL-B GL-B.4 GL-D GL-F
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Diaphragm - Gridline B - Level - Roof
Diaphragm Design - shear
Gridline =B Floor =Roof
vallow =0.180 klf L =42.50 ft
Fline =1.49 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
1.49 k Omega=1
vdia = Vdia / L
0.035
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
16.00 0.56
17.50 -0.13
27.83 0.23
29.33 -0.46
42.50 0.00
Ltotal(sw) =3.00 ft
vsw(dia) =0.495 klf (dia force level)
Panel Shear xi xj Lsw
R-B.1 0.74 16.00 17.50 1.50
R-B.2 0.74 27.83 29.33 1.50
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
klf < 0.18 klf, therefore OK
-62.00
-42.00
-22.00
-2.00
18.00
38.00
58.00
0 20 40 60 80 100
Drag Force Diagram
91
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Drag - Gridline B - Level - Roof
Diaphragm Design - shear
Gridline =B Floor =Roof
vallow =0.180 klf L =42.50 ft
Fline =1.80 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
1.80 k Omega=1
vdia = Vdia / L
0.042
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
16.00 0.68
17.50 -0.16
27.83 0.28
29.33 -0.56
42.50 0.00
Ltotal(sw) =3.00 ft
vsw(dia) =0.600 klf (dia force level)
Panel Shear xi xj Lsw
R-B.1 0.90 16.00 17.50 1.50
R-B.2 0.90 27.83 29.33 1.50
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
DRAG DESIGN ONLY
-0.80
-0.60
-0.40
-0.20
0.00
0.20
0.40
0.60
0.80
0 5 10 15 20 25 30 35 40 45
Drag Force Diagram
92
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Diaphragm - Gridline B.4 - Level - Roof
Diaphragm Design - shear
Gridline =B.4 Floor =Roof
vallow =0.180 klf L =42.50 ft
Fline =1.74 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
1.74 k Omega=1
vdia = Vdia / L
0.041
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
0.00 0.00
13.50 -1.19
42.50 0.00
Ltotal(sw) =13.50 ft
vsw(dia) =0.129 klf (dia force level)
Panel Shear xi xj Lsw
R-B.4.1 1.74 0.00 13.50 13.50
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
klf < 0.18 klf, therefore OK
-62.00
-42.00
-22.00
-2.00
18.00
38.00
58.00
0 20 40 60 80 100
Drag Force Diagram
93
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Drag - Gridline B.4 - Level - Roof
Diaphragm Design - shear
Gridline =B.4 Floor =Roof
vallow =0.180 klf L =42.50 ft
Fline =3.69 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
3.69 k Omega=1
vdia = Vdia / L
0.087
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
0.00 0.00
13.50 -2.51
42.50 0.00
Ltotal(sw) =13.50 ft
vsw(dia) =0.273 klf (dia force level)
Panel Shear xi xj Lsw
R-B.4.1 3.69 0.00 13.50 13.50
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
DRAG DESIGN ONLY
-3.00
-2.50
-2.00
-1.50
-1.00
-0.50
0.00
0 5 10 15 20 25 30 35 40 45
Drag Force Diagram
94
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Diaphragm - Gridline D - Level - Roof
Diaphragm Design - shear
Gridline =D Floor =Roof
vallow =0.180 klf L =42.50 ft
Fline =3.51 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
3.51 k Omega=1
vdia = Vdia / L
0.083
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
0.00 0.00
17.00 -2.11
42.50 0.00
Ltotal(sw) =17.00 ft
vsw(dia) =0.206 klf (dia force level)
Panel Shear xi xj Lsw
R-B.4.1 3.51 0.00 17.00 17.00
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
klf < 0.18 klf, therefore OK
-10.00
-8.00
-6.00
-4.00
-2.00
0.00
2.00
4.00
6.00
8.00
10.00
0 5 10 15 20 25 30 35 40 45
Drag Force Diagram
95
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Drag - Gridline D - Level - Roof
Diaphragm Design - shear
Gridline =D Floor =Roof
vallow =0.180 klf L =42.50 ft
Fline =9.29 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
9.29 k Omega=1
vdia = Vdia / L
0.218
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
0.00 0.00
17.00 -5.57
42.50 0.00
Ltotal(sw) =17.00 ft
vsw(dia) =0.546 klf (dia force level)
Panel Shear xi xj Lsw
R-B.4.1 9.29 0.00 17.00 17.00
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
DRAG DESIGN ONLY
-6.00
-5.00
-4.00
-3.00
-2.00
-1.00
0.00
1.00
0 5 10 15 20 25 30 35 40 45
Drag Force Diagram
96
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Diaphragm - Gridline F - Level - Roof
Diaphragm Design - shear
Gridline =F Floor =Roof
vallow =0.180 klf L =26.00 ft
Fline =3.47 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
3.47 k Omega=1
vdia = Vdia / L
0.134
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
11.33 1.51
19.33 -0.89
26.00 0.00
Ltotal(sw) =8.00 ft
vsw(dia) =0.434 klf (dia force level)
Panel Shear xi xj Lsw
R-F.1 3.47 11.33 19.33 8.00
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
klf < 0.18 klf, therefore OK
-10.00
-8.00
-6.00
-4.00
-2.00
0.00
2.00
4.00
6.00
8.00
10.00
0 5 10 15 20 25 30 35 40 45
Drag Force Diagram
97
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Drag - Gridline F - Level - Roof
Diaphragm Design - shear
Gridline =F Floor =Roof
vallow =0.180 klf L =26.00 ft
Fline =3.47 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
3.47 k Omega=1
vdia = Vdia / L
0.134
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
11.33 1.51
19.33 -0.89
26.00 0.00
Ltotal(sw) =8.00 ft
vsw(dia) =0.434 klf (dia force level)
Panel Shear xi xj Lsw
R-F.1 3.47 11.33 19.33 8.00
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
DRAG DESIGN ONLY
-1.50
-1.00
-0.50
0.00
0.50
1.00
1.50
2.00
0 5 10 15 20 25 30
Drag Force Diagram
98
Project:
Project No:
By:
Date:Revision:Page:
99
3.3.2
EAST/WEST DIAPHRAGM DESIGN
CYPRESS FIRE STATION
23005.10
JS/CHP
General Beam Analysis
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:E/W Diaphragm
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
General Beam Properties
Elastic Modulus ksi29,000.0
100.0Span #1 in^4Area =in^2 Moment of Inertia =Span Length =10.016.50 ft
100.0Span #2 in^4Area =in^2 Moment of Inertia =Span Length =10.026.0 ft
.Service loads entered. Load Factors will be applied for calculations.Applied Loads
Load for Span Number 1
Uniform Load : E = 0.4470 k/ft, Tributary Width = 1.0 ft, (EQ (19k / 42.5'))
Load for Span Number 2
Uniform Load : E = 0.4470 k/ft, Tributary Width = 1.0 ft, (EQ (19k / 42.5'))
.DESIGN SUMMARY
Maximum Bending =
Load Combination E Only * 0.70
Span # where maximum occurs Span # 1
Location of maximum on span 16.500 ft
4.849 k
Span # where maximum occurs
Location of maximum on span
Span # 1
Load Combination E Only * 0.70
Maximum Shear =
16.500 ft
20.309 k-ft
Maximum Deflection
Max Downward Transient Deflection 0.871 in 358
Max Upward Transient Deflection -0.074 in 2666
Max Downward Total Deflection 0.610 in 511
Max Upward Total Deflection -0.052 in 3808
.
Load Combination Support 1 Support 2 Support 3
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Overall MAXimum 1.929 4.69512.373
Overall MINimum
E Only * 0.70 1.351 3.2878.661
E Only * 0.5250 1.013 2.4656.496
E Only 1.929 4.69512.373
100
GL-3 GL-2 GL-1
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Diaphragm - Gridline 1 - Level - Roof
Diaphragm Design - shear
Gridline =1 Floor =Roof
vallow =0.180 klf L =90.58 ft
Fline =4.70 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
4.70 k Omega=1
vdia = Vdia / L
0.052
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
11.58 0.60
17.91 -0.82
31.91 -0.09
37.16 -1.27
48.83 -0.67
54.25 -1.88
90.58 0.00
Ltotal(sw) =17.00 ft
vsw(dia) =0.276 klf (dia force level)
Panel Shear xi xj Lsw
R-1.1 1.75 11.58 17.91 6.33
R-1.2 1.45 31.91 37.16 5.25
R-1.3 1.50 48.83 54.25 5.42
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
klf < 0.18 klf, therefore OK
-62.00
-42.00
-22.00
-2.00
18.00
38.00
58.00
0 20 40 60 80 100
Drag Force Diagram
101
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Drag - Gridline 1 - Level - Roof
Diaphragm Design - shear
Gridline =1 Floor =Roof
vallow =0.180 klf L =90.58 ft
Fline =4.70 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
4.70 k Omega=1
vdia = Vdia / L
0.052
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
11.58 0.60
17.91 -0.82
31.91 -0.09
37.16 -1.27
48.83 -0.67
54.25 -1.88
90.58 0.00
Ltotal(sw) =17.00 ft
vsw(dia) =0.276 klf (dia force level)
Panel Shear xi xj Lsw
R-1.1 1.75 11.58 17.91 6.33
R-1.2 1.45 31.91 37.16 5.25
R-1.3 1.50 48.83 54.25 5.42
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
DRAG DESIGN ONLY
-2.50
-2.00
-1.50
-1.00
-0.50
0.00
0.50
1.00
0 10 20 30 40 50 60 70 80 90 100
Drag Force Diagram
102
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Diaphragm - Gridline 2 - Level - Roof
Diaphragm Design - shear
Gridline =2 Floor =Roof
vallow =0.180 klf L =90.58 ft
Fline =6.84 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
6.84 k Omega=1
vdia = Vdia / L
0.076
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
49.00 3.70
70.00 -1.55
90.58 0.00
Ltotal(sw) =21.00 ft
vsw(dia) =0.326 klf (dia force level)
Panel Shear xi xj Lsw
R-2.1 6.84 49.00 70.00 21.00
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
klf < 0.18 klf, therefore OK
-62.00
-42.00
-22.00
-2.00
18.00
38.00
58.00
0 20 40 60 80 100
Drag Force Diagram
103
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Drag - Gridline 2 - Level - Roof
Diaphragm Design - shear
Gridline =2 Floor =Roof
vallow =0.180 klf L =90.58 ft
Fline =12.27 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
12.27 k Omega=1
vdia = Vdia / L
0.135
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
49.00 6.64
70.00 -2.79
90.58 0.00
Ltotal(sw) =21.00 ft
vsw(dia) =0.584 klf (dia force level)
Panel Shear xi xj Lsw
R-2.1 12.27 49 70 21
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
DRAG DESIGN ONLY
-4.00
-2.00
0.00
2.00
4.00
6.00
8.00
0 10 20 30 40 50 60 70 80 90 100
Drag Force Diagram
104
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Diaphragm - Gridline 3 - Level - Roof
Diaphragm Design - shear
Gridline =3 Floor =Roof
vallow =0.180 klf L =72.50 ft
Fline =1.93 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
1.93 k Omega=1
vdia = Vdia / L
0.027
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
12.00 0.32
18.50 -0.57
46.83 0.19
52.16 -0.54
72.50 0.00
Ltotal(sw) =11.83 ft
vsw(dia) =0.163 klf (dia force level)
Panel Shear xi xj Lsw
R-3.1 1.06 12.00 18.50 6.50
R-3.2 0.87 46.83 52.16 5.33
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
klf < 0.18 klf, therefore OK
-62.00
-42.00
-22.00
-2.00
18.00
38.00
58.00
0 20 40 60 80 100
Drag Force Diagram
105
Job Name:Cypress St. Fire Station - Diaphragm Design
Job #:23005.10
Date:5/15/2024
Description:Drag - Gridline 3 - Level - Roof
Diaphragm Design - shear
Gridline =3 Floor =Roof
vallow =0.180 klf L =72.50 ft
Fline =1.93 k
Vdia = Fline x Fpx/Fx Fpx/Fx =1.00
1.93 k Omega=1
vdia = Vdia / L
0.027
Diaphragm Design - drags
x (ft) V (k)
0.00 0.00
12.00 0.32
18.50 -0.57
46.83 0.19
52.16 -0.54
72.50 0.00
Ltotal(sw) =11.83 ft
vsw(dia) =0.163 klf (dia force level)
Panel Shear xi xj Lsw
R-3.1 1.06 12.00 18.50 6.50
R-3.2 0.87 46.83 52.16 5.33
15/32 Struct I w/ 10d at 6, 6, 12 (un-blocked)
DRAG DESIGN ONLY
-0.70
-0.60
-0.50
-0.40
-0.30
-0.20
-0.10
0.00
0.10
0.20
0.30
0.40
0 10 20 30 40 50 60 70 80
Drag Force Diagram
106
Project:
Project No:
By:
Date:Revision:Page:
107
CYPRESS FIRE STATION
23005.10
JS/CHP
4.0
FOUNDATION DESIGN
Project:
Project No:
By:
Date:Revision:Page:
108
4.1
SPREAD & ISOLATED FOOTINGS
CYPRESS FIRE STATION
23005.10
JS/CHP
Project:
Project No:
By:
Date:Revision:Page:
109
R-WSWH-GB:
CYPRESS FIRE STATION
23005.10
JS/CHP
W
S
W
H
18
x
1
4
W
S
W
H
18
x
1
4
5
SF
-
2
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
SF-2
2'-0" WIDE x 18" THK
(4) #5
(4) #5
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:WSWH GB
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Analysis/Design Settings
YesCalculate footing weight as dead load ?
NoCalculate Pedestal weight as dead load ?
4.0
60.0
3,605.0 ksi
145.0 0.00180
1.0
1.0
pcf
Min. Overturning Safety Factor : 1
Ec : Concrete Elastic Modulus
Min. Sliding Safety Factor : 1
Concrete Density Min Allow % Temp Reinf (based on thick)
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf (based on 'd')
0.90
0.750
: Phi Values Flexure :
Shear :I
Soil Information
Soil Bearing Increase3.30
No
250.0
0.30
5.0
3.30 ksf
(Allowable Soil Bearing adjusted for footing weight anddepth & width increases as specified by user.)
Increases based on footing Depth . . . .
Increases based on footing Width . . .
Footing base depth below soil surfaceAllowable Soil Bearing ksf
Increase Bearing By Footing Weight
Coefficient of Soil/Concrete Friction
Adjusted Allowable Soil Bearing
Soil Passive Sliding Resistance pcf Allowable pressure increase per foot ksf
when base of footing is below ft
Allowable pressure increase per foot ksf
when maximum length or width is greater than ft
(Uses entry for "Footing base depth below soil surface" for force)
Maximum Allowed Bearing Pressure 3.30 ksf
(A value of zero implies no limit)
ft
Dimensions & Reinforcing
Distance Left of Column #1 =
=
=
1.0 ft
Between Columns 12.670 ft
Distance Right of Column #2 1.0 ft
Total Footing Length =14.670
Col #1
ft
=
2.0Footing Width =ft
Pedestal dimensions...
Col #2
Sq. Dim.6.0 6.0 in=
Height in=
in^2
Footing Thickness 18.0 in in^2
Rebar Center to Concrete Edge @ Top 3.0 in
Rebar Center to Concrete Edge @ Bottom 3.0 in
=
=
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
Bottom Bars
Size #
As As
Count
1.240 0.7776 in^2
Req'dProvided
0.7776 in^2Bars Btwn ColsBottom Bars 1.240
1.240 0.7776 in^2
Top Bars in^21.240 0.7776
Bars Right of Col #2
Top Bars 1.240 0.7776
Top Bars 1.240 0.7776
Bottom Bars
Bars left of Col #1
Applied Loads
Applied @ Left Column
Axial Load Downward
Moment (+CW)=
Shear (+X)=
S E HWLDLr
k
Applied @ Right Column
=
k-ft
Axial Load Downward
k-ft
k
k
Moment (+CW)=
Shear (+X)=
=
9.40
9.40
k
Overburden =
110
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:WSWH GB
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
DESIGN SUMMARY Design OK
Governing Load CombinationFactor of Safety Item Applied Capacity
PASS 0.2359 Soil Bearing 0.7785 ksf 3.30 ksf +D+0.70E
PASS 6.255 Overturning 13.160 k-ft 82.317 k-ft +0.60D+0.70E
PASS No Sliding Sliding 0.0 k 8.736 k No Sliding
PASS No Uplift Uplift 0.0 k 0.0 k No Uplift
Utilization Ratio Item Applied Capacity Governing Load Combination
PASS 0.001329 Flexure - Right of Col #2 - Top
Flexure - Left of Col #1 - Top -0.2287 k-ft
No Bending Flexure - Left of Col #1 - Bottom 0.0 k-ft
+1.20D+E
PASS
0.0 N/A
PASS
k-ft
Flexure - Between Cols - Top 81.156-9.119 k-ft0.1124
+0.90D+E
k-ft
Flexure - Between Cols - Bottom 8.899 k-ft0.1097 81.156 k-ft
-0.1078 k-ft 81.156 k-ft +1.40D
PASS 0.000825 Flexure - Right of Col #2 - Bottom 0.06698 k-ft 81.156 k-ft +0.90D+E
PASS 0.02921 1-way Shear - Col #1 2.771 psi 94.868 psi +0.90D+E
PASS 0.03518 1-way Shear - Col #2 3.338 psi 94.868 psi +1.20D+E
PASS 0.01447 2-way Punching - Col #1 2.746 psi 189.737 psi +1.40D
2-way Punching - Col #2 2.905 psi 189.737 psi +1.20D+E
0.002818 +1.20D+EPASS
PASS
81.156 k-ft
PASS 0.01531
Soil Bearing
Eccentricity Actual Soil Bearing Stress Actual / Allow
Total Bearing @ Left Edge @ Right Edgefrom Ftg CL Allowable RatioLoad Combination...
D Only 17.47 0.60 0.60 3.30 0.180kftksfksfksf0.000
+0.60D 14.92 0.51 0.51 3.30 0.154kftksfksfksf0.000
+D+0.70E 17.47 0.41 0.78 3.30 0.236kftksfksfksf0.753
+D+0.5250E 17.47 0.46 0.73 3.30 0.222kftksfksfksf0.565
+0.60D+0.70E 14.92 0.33 0.69 3.30 0.210kftksfksfksf0.882
Moments about Left Edge Moments about Right Edgek-ft k-ft
Overturning Stability
Load Combination...Overturning Resisting Ratio Overturning Resisting Ratio
D Only 0.00 0.00 999.000 0.00 0.00 999.000
+0.60D 0.00 0.00 999.000 0.00 0.00 999.000
+D+0.70E 0.00 0.00 999.000 13.16 137.20 10.425
+D+0.5250E 0.00 0.00 999.000 9.87 137.20 13.900
+0.60D+0.70E 0.00 0.00 999.000 13.16 82.32 6.255
Sliding Stability
Load Combination...Sliding Force Resisting Force Sliding SafetyRatio
D Only 0.00 8.74 999kk
+0.60D 0.00 6.52 999kk
+D+0.70E 0.00 8.74 999kk
+D+0.5250E 0.00 8.74 999kk
+0.60D+0.70E 0.00 6.52 999kk
111
Project:
Project No:
By:
Date:Revision:Page:
112
R-B.4.1-FTG:
CYPRESS FIRE STATION
23005.10
JS/CHP
6' -6"
6
2A2A
13
'
-
6"
4
2B
2B
SF-2A
SF
-
3
5
WS
W
H
18
x
1
4
5
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
SF-2A
2'-0" WIDE x 24" THK
(5) #5
(5) #5
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-B.4.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Analysis/Design Settings
YesCalculate footing weight as dead load ?
NoCalculate Pedestal weight as dead load ?
4.0
60.0
3,605.0 ksi
145.0 0.00180
1.0
1.0
pcf
Min. Overturning Safety Factor : 1
Ec : Concrete Elastic Modulus
Min. Sliding Safety Factor : 1
Concrete Density Min Allow % Temp Reinf (based on thick)
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf (based on 'd')
0.90
0.750
: Phi Values Flexure :
Shear :I
Soil Information
Soil Bearing Increase3.30
No
250.0
0.30
5.0
3.30 ksf
(Allowable Soil Bearing adjusted for footing weight anddepth & width increases as specified by user.)
Increases based on footing Depth . . . .
Increases based on footing Width . . .
Footing base depth below soil surfaceAllowable Soil Bearing ksf
Increase Bearing By Footing Weight
Coefficient of Soil/Concrete Friction
Adjusted Allowable Soil Bearing
Soil Passive Sliding Resistance pcf Allowable pressure increase per foot ksf
when base of footing is below ft
Allowable pressure increase per foot ksf
when maximum length or width is greater than ft
(Uses entry for "Footing base depth below soil surface" for force)
Maximum Allowed Bearing Pressure 10.0 ksf
(A value of zero implies no limit)
ft
Dimensions & Reinforcing
Distance Left of Column #1 =
=
=
0.50 ft
Between Columns 12.50 ft
Distance Right of Column #2 0.50 ft
Total Footing Length =13.50
Col #1
ft
=
2.0Footing Width =ft
Pedestal dimensions...
Col #2
Sq. Dim.6.0 6.0 in=
Height in=
in^2
Footing Thickness 24.0 in in^2
Rebar Center to Concrete Edge @ Top 3.0 in
Rebar Center to Concrete Edge @ Bottom 3.0 in
=
=
5.0 5
5.0 5
5.0 5
5.0 5
5.0 5
5.0 5
Bottom Bars
Size #
As As
Count
1.550 1.037 in^2
Req'dProvided
1.037 in^2Bars Btwn ColsBottom Bars 1.550
1.550 1.037 in^2
Top Bars in^21.550 1.037
Bars Right of Col #2
Top Bars 1.550 1.037
Top Bars 1.550 1.037
Bottom Bars
Bars left of Col #1
Applied Loads
Applied @ Left Column
Axial Load Downward
Moment (+CW)=
Shear (+X)=
S E HWLDLr
k
Applied @ Right Column
=
k-ft
Axial Load Downward
k-ft
k
k
Moment (+CW)=
Shear (+X)=
=-2.566
4.249
k
Overburden =
113
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-B.4.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
DESIGN SUMMARY Design OK
Governing Load CombinationFactor of Safety Item Applied Capacity
PASS 0.3476 Soil Bearing 1.147 ksf 3.30 ksf +D+0.70E
PASS 3.108 Overturning 23.351 k-ft 72.565 k-ft +0.60D+0.70E
PASS No Sliding Sliding 0.0 k 9.211 k No Sliding
PASS 7.518 Uplift 1.796 k 13.504 k +0.60D+0.70E
Utilization Ratio Item Applied Capacity Governing Load Combination
PASS 0.000209 Flexure - Right of Col #2 - Top
Flexure - Left of Col #1 - Top -0.06071 k-ft
No Bending Flexure - Left of Col #1 - Bottom 0.0 k-ft
+1.20D+E
PASS
0.0 N/A
PASS
k-ft
Flexure - Between Cols - Top 142.50-4.953 k-ft0.03476
+0.90D+E
k-ft
Flexure - Between Cols - Bottom 1.690 k-ft0.01186 142.50 k-ft
-0.02977 k-ft 142.50 k-ft +1.40D
PASS 0.000162 Flexure - Right of Col #2 - Bottom 0.02315 k-ft 142.50 k-ft +0.90D+E
PASS 0.002660 1-way Shear - Col #1 0.2524 psi 94.868 psi +1.20D+E
PASS 0.02085 1-way Shear - Col #2 1.978 psi 94.868 psi +0.90D+E
PASS 0.008397 2-way Punching - Col #1 1.593 psi 189.737 psi +1.20D+E
2-way Punching - Col #2 3.356 psi 189.737 psi +1.20D+E
0.000426 +1.20D+EPASS
PASS
142.50 k-ft
PASS 0.01769
Soil Bearing
Eccentricity Actual Soil Bearing Stress Actual / Allow
Total Bearing @ Left Edge @ Right Edgefrom Ftg CL Allowable RatioLoad Combination...
D Only 16.58 0.61 0.61 3.30 0.186kftksfksfksf0.000
+0.60D 13.45 0.50 0.50 3.30 0.151kftksfksfksf0.000
+D+0.70E 17.76 0.17 1.15 3.30 0.348kftksfksfksf1.679
+D+0.5250E 17.46 0.28 1.01 3.30 0.307kftksfksfksf1.281
+0.60D+0.70E 14.62 0.05 1.03 3.30 0.312kftksfksfksf2.039
Moments about Left Edge Moments about Right Edgek-ft k-ft
Overturning Stability
Load Combination...Overturning Resisting Ratio Overturning Resisting Ratio
D Only 0.00 0.00 999.000 0.00 0.00 999.000
+0.60D 0.00 0.00 999.000 0.00 0.00 999.000
+D+0.70E 0.90 157.13 174.956 23.35 119.95 5.137
+D+0.5250E 0.67 147.46 218.924 17.51 119.58 6.828
+0.60D+0.70E 0.90 109.74 122.195 23.35 72.56 3.108
Sliding Stability
Load Combination...Sliding Force Resisting Force Sliding SafetyRatio
D Only 0.00 9.21 999kk
+0.60D 0.00 7.13 999kk
+D+0.70E 0.00 9.56 999kk
+D+0.5250E 0.00 9.48 999kk
+0.60D+0.70E 0.00 7.48 999kk
114
Project:
Project No:
By:
Date:Revision:Page:
115
R-D.1-FTG:
CYPRESS FIRE STATION
23005.10
JS/CHP
6x6
2A
2A
17
'
-
0"
4
F-25
SF
-
2
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
SF-2
2'-0" WIDE x 18" THK
(4) #5
(4) #5
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-D.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Analysis/Design Settings
YesCalculate footing weight as dead load ?
NoCalculate Pedestal weight as dead load ?
4.0
60.0
3,122.02 ksi
145.0 0.00180
1.0
1.0
pcf
Min. Overturning Safety Factor : 1
Ec : Concrete Elastic Modulus
Min. Sliding Safety Factor : 1
Concrete Density Min Allow % Temp Reinf (based on thick)
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf (based on 'd')
0.90
0.750
: Phi Values Flexure :
Shear :I
Soil Information
Soil Bearing Increase3.20
No
250.0
0.30
5.0
3.20 ksf
(Allowable Soil Bearing adjusted for footing weight anddepth & width increases as specified by user.)
Increases based on footing Depth . . . .
Increases based on footing Width . . .
Footing base depth below soil surfaceAllowable Soil Bearing ksf
Increase Bearing By Footing Weight
Coefficient of Soil/Concrete Friction
Adjusted Allowable Soil Bearing
Soil Passive Sliding Resistance pcf Allowable pressure increase per foot ksf
when base of footing is below ft
Allowable pressure increase per foot ksf
when maximum length or width is greater than ft
(Uses entry for "Footing base depth below soil surface" for force)
Maximum Allowed Bearing Pressure 3.20 ksf
(A value of zero implies no limit)
ft
Dimensions & Reinforcing
Distance Left of Column #1 =
=
=
0.50 ft
Between Columns 16.0 ft
Distance Right of Column #2 0.50 ft
Total Footing Length =17.0
Col #1
ft
=
2.0Footing Width =ft
Pedestal dimensions...
Col #2
Sq. Dim.6.0 6.0 in=
Height in=
in^2
Footing Thickness 18.0 in in^2
Rebar Center to Concrete Edge @ Top 3.0 in
Rebar Center to Concrete Edge @ Bottom 3.0 in
=
=
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
Bottom Bars
Size #
As As
Count
1.240 0.7776 in^2
Req'dProvided
0.7776 in^2Bars Btwn ColsBottom Bars 1.240
1.240 0.7776 in^2
Top Bars in^21.240 0.7776
Bars Right of Col #2
Top Bars 1.240 0.7776
Top Bars 1.240 0.7776
Bottom Bars
Bars left of Col #1
Applied Loads
Applied @ Left Column
Axial Load Downward
Moment (+CW)=
Shear (+X)=
S E HWLDLr
k
Applied @ Right Column
=
k-ft
Axial Load Downward
k-ft
k
k
Moment (+CW)=
Shear (+X)=
=-3.825
5.927
k
Overburden =
116
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-D.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
DESIGN SUMMARY Design OK
Governing Load CombinationFactor of Safety Item Applied Capacity
PASS 0.3763 Soil Bearing 1.204 ksf 3.20 ksf +D+0.70E
PASS 2.549 Overturning 44.179 k-ft 112.617 k-ft +0.60D+0.70E
PASS No Sliding Sliding 0.0 k 9.627 k No Sliding
PASS 6.407 Uplift 2.678 k 17.154 k +0.60D+0.70E
Utilization Ratio Item Applied Capacity Governing Load Combination
PASS 0.000385 Flexure - Right of Col #2 - Top
Flexure - Left of Col #1 - Top -0.06025 k-ft
No Bending Flexure - Left of Col #1 - Bottom 0.0 k-ft
+1.20D+E
PASS
0.0 N/A
PASS
k-ft
Flexure - Between Cols - Top 81.156-9.014 k-ft0.1111
+0.90D+E
k-ft
Flexure - Between Cols - Bottom 4.454 k-ft0.05489 81.156 k-ft
-0.03124 k-ft 81.156 k-ft +1.40D
PASS 0.000249 Flexure - Right of Col #2 - Bottom 0.02021 k-ft 81.156 k-ft +0.90D+E
PASS 0.04757 1-way Shear - Col #1 4.513 psi 94.868 psi +0.90D+E
PASS 0.07913 1-way Shear - Col #2 7.507 psi 94.868 psi +1.20D+E
PASS 0.01940 2-way Punching - Col #1 3.680 psi 189.737 psi +1.20D+E
2-way Punching - Col #2 6.483 psi 189.737 psi +1.20D+E
0.000742 +1.20D+EPASS
PASS
81.156 k-ft
PASS 0.03417
Soil Bearing
Eccentricity Actual Soil Bearing Stress Actual / Allow
Total Bearing @ Left Edge @ Right Edgefrom Ftg CL Allowable RatioLoad Combination...
D Only 20.25 0.60 0.60 3.20 0.186kftksfksfksf0.000
+0.60D 17.29 0.51 0.51 3.20 0.159kftksfksfksf0.000
+D+0.70E 21.72 0.07 1.20 3.20 0.376kftksfksfksf2.515
+D+0.5250E 21.35 0.20 1.05 3.20 0.329kftksfksfksf1.918
+0.60D+0.70E 18.76 0.00 1.12 3.20 0.349kftksfksfksf2.911
Moments about Left Edge Moments about Right Edgek-ft k-ft
Overturning Stability
Load Combination...Overturning Resisting Ratio Overturning Resisting Ratio
D Only 0.00 0.00 999.000 0.00 0.00 999.000
+0.60D 0.00 0.00 999.000 0.00 0.00 999.000
+D+0.70E 1.34 252.69 188.754 44.18 186.31 4.217
+D+0.5250E 1.00 235.58 234.627 33.13 185.79 5.607
+0.60D+0.70E 1.34 179.00 133.706 44.18 112.62 2.549
Sliding Stability
Load Combination...Sliding Force Resisting Force Sliding SafetyRatio
D Only 0.00 9.63 999kk
+0.60D 0.00 7.05 999kk
+D+0.70E 0.00 10.07 999kk
+D+0.5250E 0.00 9.96 999kk
+0.60D+0.70E 0.00 7.49 999kk
117
Project:
Project No:
By:
Date:Revision:Page:
118
R-F.1-FTG:
CYPRESS FIRE STATION
23005.10
JS/CHP
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
SF-2A
2'-0" WIDE x 24" THK
(5) #5
(5) #5
2A
2A
8'
-
0"
6
SF
-
2
A
5
PROVIDE CONT.
CMST14 STRAP ALONG
SHEAR WALL LENGTH
ABOVE AND BELOW
WINDOW OPENING
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-F.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Analysis/Design Settings
YesCalculate footing weight as dead load ?
NoCalculate Pedestal weight as dead load ?
4.0
60.0
3,122.02 ksi
145.0 0.00180
1.0
1.0
pcf
Min. Overturning Safety Factor : 1
Ec : Concrete Elastic Modulus
Min. Sliding Safety Factor : 1
Concrete Density Min Allow % Temp Reinf (based on thick)
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf (based on 'd')
0.90
0.750
: Phi Values Flexure :
Shear :I
Soil Information
Soil Bearing Increase3.30
No
250.0
0.30
5.0
3.20 ksf
(Allowable Soil Bearing adjusted for footing weight anddepth & width increases as specified by user.)
Increases based on footing Depth . . . .
Increases based on footing Width . . .
Footing base depth below soil surfaceAllowable Soil Bearing ksf
Increase Bearing By Footing Weight
Coefficient of Soil/Concrete Friction
Adjusted Allowable Soil Bearing
Soil Passive Sliding Resistance pcf Allowable pressure increase per foot ksf
when base of footing is below ft
Allowable pressure increase per foot ksf
when maximum length or width is greater than ft
(Uses entry for "Footing base depth below soil surface" for force)
Maximum Allowed Bearing Pressure 3.20 ksf
(A value of zero implies no limit)
ft
Dimensions & Reinforcing
Distance Left of Column #1 =
=
=
0.50 ft
Between Columns 7.0 ft
Distance Right of Column #2 0.50 ft
Total Footing Length =8.0
Col #1
ft
=
2.0Footing Width =ft
Pedestal dimensions...
Col #2
Sq. Dim.6.0 6.0 in=
Height in=
in^2
Footing Thickness 24.0 in in^2
Rebar Center to Concrete Edge @ Top 3.0 in
Rebar Center to Concrete Edge @ Bottom 3.0 in
=
=
5.0 5
7.0 5
5.0 5
5.0 5
5.0 5
5.0 5
Bottom Bars
Size #
As As
Count
1.550 1.037 in^2
Req'dProvided
1.037 in^2Bars Btwn ColsBottom Bars 1.550
1.550 1.037 in^2
Top Bars in^22.170 1.037
Bars Right of Col #2
Top Bars 1.550 1.037
Top Bars 1.550 1.037
Bottom Bars
Bars left of Col #1
Applied Loads
Applied @ Left Column
Axial Load Downward
Moment (+CW)=
Shear (+X)=
S E HWLDLr
k
Applied @ Right Column
=
k-ft
Axial Load Downward
k-ft
k
k
Moment (+CW)=
Shear (+X)=
=-3.321
5.369
k
Overburden =
119
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-F.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
DESIGN SUMMARY Design OK
Governing Load CombinationFactor of Safety Item Applied Capacity
PASS 0.5632 Soil Bearing 1.802 ksf 3.20 ksf +0.60D+0.70E
PASS 1.539 Overturning 17.435 k-ft 26.839 k-ft +0.60D+0.70E
PASS No Sliding Sliding 0.0 k 7.066 k No Sliding
PASS 4.301 Uplift 2.325 k 9.998 k +0.60D+0.70E
Utilization Ratio Item Applied Capacity Governing Load Combination
PASS 0.000212 Flexure - Right of Col #2 - Top
Flexure - Left of Col #1 - Top -0.07085 k-ft
No Bending Flexure - Left of Col #1 - Bottom 0.0 k-ft
+1.20D+E
PASS
0.0 N/A
PASS
k-ft
Flexure - Between Cols - Top 142.50-2.254 k-ft0.01582
+0.90D+E
k-ft
Flexure - Between Cols - Bottom 3.012 k-ft0.02114 142.50 k-ft
-0.03024 k-ft 142.50 k-ft +1.40D
PASS 0.000756 Flexure - Right of Col #2 - Bottom 0.1078 k-ft 142.50 k-ft +0.90D+E
PASS 0.009976 1-way Shear - Col #1 0.9464 psi 94.868 psi +0.90D+E
PASS 0.03322 1-way Shear - Col #2 3.152 psi 94.868 psi +0.90D+E
PASS 0.008455 2-way Punching - Col #1 1.604 psi 189.737 psi +1.20D+E
2-way Punching - Col #2 4.817 psi 189.737 psi +0.90D+E
0.000359 +1.20D+EPASS
PASS
197.275 k-ft
PASS 0.02539
Soil Bearing
Eccentricity Actual Soil Bearing Stress Actual / Allow
Total Bearing @ Left Edge @ Right Edgefrom Ftg CL Allowable RatioLoad Combination...
D Only 9.82 0.61 0.61 3.20 0.192kftksfksfksf0.000
+0.60D 7.97 0.50 0.50 3.20 0.156kftksfksfksf0.000
+D+0.70E 11.26 0.00 1.78 3.20 0.555kftksfksfksf1.891
+D+0.5250E 10.90 0.00 1.43 3.20 0.447kftksfksfksf1.465
+0.60D+0.70E 9.40 0.00 1.80 3.20 0.563kftksfksfksf2.265
Moments about Left Edge Moments about Right Edgek-ft k-ft
Overturning Stability
Load Combination...Overturning Resisting Ratio Overturning Resisting Ratio
D Only 0.00 0.00 999.000 0.00 0.00 999.000
+0.60D 0.00 0.00 999.000 0.00 0.00 999.000
+D+0.70E 1.16 69.79 60.040 17.44 43.48 2.494
+D+0.5250E 0.87 62.74 71.970 13.08 43.01 3.289
+0.60D+0.70E 1.16 53.15 45.724 17.44 26.84 1.539
Sliding Stability
Load Combination...Sliding Force Resisting Force Sliding SafetyRatio
D Only 0.00 7.07 999kk
+0.60D 0.00 5.84 999kk
+D+0.70E 0.00 7.50 999kk
+D+0.5250E 0.00 7.39 999kk
+0.60D+0.70E 0.00 6.27 999kk
120
Project:
Project No:
By:
Date:Revision:Page:
121
R-1.1-FTG:
CYPRESS FIRE STATION
23005.10
JS/CHP
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
SF-2A
2'-0" WIDE x 24" THK
(5) #5
(5) #5
9' -6"
62A 2A
SF-2A
5
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-1.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Analysis/Design Settings
YesCalculate footing weight as dead load ?
NoCalculate Pedestal weight as dead load ?
4.0
60.0
3,605.0 ksi
145.0 0.00180
1.0
1.0
pcf
Min. Overturning Safety Factor : 1
Ec : Concrete Elastic Modulus
Min. Sliding Safety Factor : 1
Concrete Density Min Allow % Temp Reinf (based on thick)
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf (based on 'd')
0.90
0.750
: Phi Values Flexure :
Shear :I
Soil Information
Soil Bearing Increase3.20
No
250.0
0.30
5.0
3.20 ksf
(Allowable Soil Bearing adjusted for footing weight anddepth & width increases as specified by user.)
Increases based on footing Depth . . . .
Increases based on footing Width . . .
Footing base depth below soil surfaceAllowable Soil Bearing ksf
Increase Bearing By Footing Weight
Coefficient of Soil/Concrete Friction
Adjusted Allowable Soil Bearing
Soil Passive Sliding Resistance pcf Allowable pressure increase per foot ksf
when base of footing is below ft
Allowable pressure increase per foot ksf
when maximum length or width is greater than ft
(Uses entry for "Footing base depth below soil surface" for force)
Maximum Allowed Bearing Pressure 10.0 ksf
(A value of zero implies no limit)
ft
Dimensions & Reinforcing
Distance Left of Column #1 =
=
=
1.50 ft
Between Columns 4.50 ft
Distance Right of Column #2 1.50 ft
Total Footing Length =7.50
Col #1
ft
=
2.0Footing Width =ft
Pedestal dimensions...
Col #2
Sq. Dim.6.0 6.0 in=
Height in=
in^2
Footing Thickness 24.0 in in^2
Rebar Center to Concrete Edge @ Top 3.0 in
Rebar Center to Concrete Edge @ Bottom 3.0 in
=
=
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
Bottom Bars
Size #
As As
Count
1.240 1.037 in^2
Req'dProvided
1.037 in^2Bars Btwn ColsBottom Bars 1.240
1.240 1.037 in^2
Top Bars in^21.240 1.037
Bars Right of Col #2
Top Bars 1.240 1.037
Top Bars 1.240 1.037
Bottom Bars
Bars left of Col #1
Applied Loads
Applied @ Left Column
Axial Load Downward
Moment (+CW)=
Shear (+X)=
S E HWLDLr
k
Applied @ Right Column
=
k-ft
Axial Load Downward
k-ft
k
k
Moment (+CW)=
Shear (+X)=
=-2.976
4.735
k
Overburden =0.110
122
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-1.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
DESIGN SUMMARY Design OK
Governing Load CombinationFactor of Safety Item Applied Capacity
PASS 0.4061 Soil Bearing 1.299 ksf 3.20 ksf +0.60D+0.70E
PASS 1.478 Overturning 12.499 k-ft 18.472 k-ft +0.60D+0.70E
PASS No Sliding Sliding 0.0 k 5.784 k No Sliding
PASS 3.319 Uplift 2.083 k 6.915 k +0.60D+0.70E
Utilization Ratio Item Applied Capacity Governing Load Combination
PASS 0.000416 Flexure - Right of Col #2 - Top
Flexure - Left of Col #1 - Top -0.7759 k-ft
No Bending Flexure - Left of Col #1 - Bottom 0.0 k-ft
+1.20D+E
PASS
0.0 N/A
PASS
k-ft
Flexure - Between Cols - Top 114.636-0.7594 k-ft0.006624
+0.90D+E
k-ft
Flexure - Between Cols - Bottom 2.365 k-ft0.02063 114.636 k-ft
-0.04764 k-ft 114.636 k-ft +1.40D
PASS 0.01646 Flexure - Right of Col #2 - Bottom 1.887 k-ft 114.636 k-ft +0.90D+E
PASS 0.01006 1-way Shear - Col #1 0.9539 psi 94.868 psi +0.90D+E
PASS 0.004920 1-way Shear - Col #2 0.4668 psi 94.868 psi +1.20D+E
PASS 0.002738 2-way Punching - Col #1 0.5195 psi 189.737 psi +0.90D+E
2-way Punching - Col #2 2.743 psi 189.737 psi +0.90D+E
0.006769 +1.20D+EPASS
PASS
114.636 k-ft
PASS 0.01446
Soil Bearing
Eccentricity Actual Soil Bearing Stress Actual / Allow
Total Bearing @ Left Edge @ Right Edgefrom Ftg CL Allowable RatioLoad Combination...
D Only 6.00 0.40 0.40 3.20 0.125kftksfksfksf0.000
+0.60D 3.60 0.24 0.24 3.20 0.075kftksfksfksf0.000
+D+0.70E 7.23 0.00 1.16 3.20 0.363kftksfksfksf1.679
+D+0.5250E 6.92 0.00 0.95 3.20 0.296kftksfksfksf1.316
+0.60D+0.70E 4.83 0.00 1.30 3.20 0.406kftksfksfksf2.514
Moments about Left Edge Moments about Right Edgek-ft k-ft
Overturning Stability
Load Combination...Overturning Resisting Ratio Overturning Resisting Ratio
D Only 0.00 0.00 999.000 0.00 0.00 999.000
+0.60D 0.00 0.00 999.000 0.00 0.00 999.000
+D+0.70E 3.12 42.39 13.565 12.50 27.47 2.198
+D+0.5250E 2.34 37.42 15.965 9.37 26.23 2.798
+0.60D+0.70E 3.12 33.39 10.685 12.50 18.47 1.478
Sliding Stability
Load Combination...Sliding Force Resisting Force Sliding SafetyRatio
D Only 0.00 5.78 999kk
+0.60D 0.00 5.07 999kk
+D+0.70E 0.00 6.15 999kk
+D+0.5250E 0.00 6.06 999kk
+0.60D+0.70E 0.00 5.44 999kk
123
Project:
Project No:
By:
Date:Revision:Page:
124
R-1.2-FTG: (R-1.3 FTG SIM.)
CYPRESS FIRE STATION
23005.10
JS/CHP
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
SF-2A
2'-0" WIDE x 24" THK
(5) #5
(5) #5
5' -6"
4 2A2A
SF-2A
5
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-1.2 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Analysis/Design Settings
YesCalculate footing weight as dead load ?
NoCalculate Pedestal weight as dead load ?
4.0
60.0
3,605.0 ksi
145.0 0.00180
1.0
1.0
pcf
Min. Overturning Safety Factor : 1
Ec : Concrete Elastic Modulus
Min. Sliding Safety Factor : 1
Concrete Density Min Allow % Temp Reinf (based on thick)
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf (based on 'd')
0.90
0.750
: Phi Values Flexure :
Shear :I
Soil Information
Soil Bearing Increase3.20
No
250.0
0.30
5.0
3.20 ksf
(Allowable Soil Bearing adjusted for footing weight anddepth & width increases as specified by user.)
Increases based on footing Depth . . . .
Increases based on footing Width . . .
Footing base depth below soil surfaceAllowable Soil Bearing ksf
Increase Bearing By Footing Weight
Coefficient of Soil/Concrete Friction
Adjusted Allowable Soil Bearing
Soil Passive Sliding Resistance pcf Allowable pressure increase per foot ksf
when base of footing is below ft
Allowable pressure increase per foot ksf
when maximum length or width is greater than ft
(Uses entry for "Footing base depth below soil surface" for force)
Maximum Allowed Bearing Pressure 10.0 ksf
(A value of zero implies no limit)
ft
Dimensions & Reinforcing
Distance Left of Column #1 =
=
=
1.50 ft
Between Columns 4.50 ft
Distance Right of Column #2 1.50 ft
Total Footing Length =7.50
Col #1
ft
=
2.0Footing Width =ft
Pedestal dimensions...
Col #2
Sq. Dim.6.0 6.0 in=
Height in=
in^2
Footing Thickness 24.0 in in^2
Rebar Center to Concrete Edge @ Top 3.0 in
Rebar Center to Concrete Edge @ Bottom 3.0 in
=
=
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
Bottom Bars
Size #
As As
Count
1.240 1.037 in^2
Req'dProvided
1.037 in^2Bars Btwn ColsBottom Bars 1.240
1.240 1.037 in^2
Top Bars in^21.240 1.037
Bars Right of Col #2
Top Bars 1.240 1.037
Top Bars 1.240 1.037
Bottom Bars
Bars left of Col #1
Applied Loads
Applied @ Left Column
Axial Load Downward
Moment (+CW)=
Shear (+X)=
S E HWLDLr
k
Applied @ Right Column
=
k-ft
Axial Load Downward
k-ft
k
k
Moment (+CW)=
Shear (+X)=
=-3.116
4.602
k
Overburden =0.110
125
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-1.2 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
DESIGN SUMMARY Design OK
Governing Load CombinationFactor of Safety Item Applied Capacity
PASS 0.4264 Soil Bearing 1.365 ksf 3.20 ksf +0.60D+0.70E
PASS 1.401 Overturning 13.087 k-ft 18.332 k-ft +0.60D+0.70E
PASS No Sliding Sliding 0.0 k 5.784 k No Sliding
PASS 3.127 Uplift 2.181 k 6.821 k +0.60D+0.70E
Utilization Ratio Item Applied Capacity Governing Load Combination
PASS 0.000416 Flexure - Right of Col #2 - Top
Flexure - Left of Col #1 - Top -0.7759 k-ft
No Bending Flexure - Left of Col #1 - Bottom 0.0 k-ft
+1.20D+E
PASS
0.0 N/A
PASS
k-ft
Flexure - Between Cols - Top 114.636-0.7226 k-ft0.006304
+0.90D+E
k-ft
Flexure - Between Cols - Bottom 2.517 k-ft0.02195 114.636 k-ft
-0.04764 k-ft 114.636 k-ft +1.40D
PASS 0.01710 Flexure - Right of Col #2 - Bottom 1.960 k-ft 114.636 k-ft +0.90D+E
PASS 0.01298 1-way Shear - Col #1 1.232 psi 94.868 psi +0.90D+E
PASS 0.004755 1-way Shear - Col #2 0.4511 psi 94.868 psi +0.90D+E
PASS 0.003063 2-way Punching - Col #1 0.5812 psi 189.737 psi +0.90D+E
2-way Punching - Col #2 2.780 psi 189.737 psi +0.90D+E
0.006769 +1.20D+EPASS
PASS
114.636 k-ft
PASS 0.01465
Soil Bearing
Eccentricity Actual Soil Bearing Stress Actual / Allow
Total Bearing @ Left Edge @ Right Edgefrom Ftg CL Allowable RatioLoad Combination...
D Only 6.00 0.40 0.40 3.20 0.125kftksfksfksf0.000
+0.60D 3.60 0.24 0.24 3.20 0.075kftksfksfksf0.000
+D+0.70E 7.04 0.00 1.16 3.20 0.362kftksfksfksf1.727
+D+0.5250E 6.78 0.00 0.94 3.20 0.293kftksfksfksf1.345
+0.60D+0.70E 4.64 0.00 1.36 3.20 0.426kftksfksfksf2.620
Moments about Left Edge Moments about Right Edgek-ft k-ft
Overturning Stability
Load Combination...Overturning Resisting Ratio Overturning Resisting Ratio
D Only 0.00 0.00 999.000 0.00 0.00 999.000
+0.60D 0.00 0.00 999.000 0.00 0.00 999.000
+D+0.70E 3.27 41.83 12.785 13.09 27.33 2.088
+D+0.5250E 2.45 37.00 15.077 9.82 26.12 2.662
+0.60D+0.70E 3.27 32.83 10.034 13.09 18.33 1.401
Sliding Stability
Load Combination...Sliding Force Resisting Force Sliding SafetyRatio
D Only 0.00 5.78 999kk
+0.60D 0.00 5.07 999kk
+D+0.70E 0.00 6.10 999kk
+D+0.5250E 0.00 6.02 999kk
+0.60D+0.70E 0.00 5.38 999kk
126
Project:
Project No:
By:
Date:Revision:Page:
127
R-2.1-FTG:
CYPRESS FIRE STATION
23005.10
JS/CHP
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
SF-2
2'-0" WIDE x 18" THK
(4) #5
(4) #5
22' -2"
4 2A2ASF-2
5
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-2.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Analysis/Design Settings
YesCalculate footing weight as dead load ?
NoCalculate Pedestal weight as dead load ?
4.0
60.0
3,605.0 ksi
145.0 0.00180
1.0
1.0
pcf
Min. Overturning Safety Factor : 1
Ec : Concrete Elastic Modulus
Min. Sliding Safety Factor : 1
Concrete Density Min Allow % Temp Reinf (based on thick)
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf (based on 'd')
0.90
0.750
: Phi Values Flexure :
Shear :I
Soil Information
Soil Bearing Increase3.20
No
250.0
0.30
5.0
3.20 ksf
(Allowable Soil Bearing adjusted for footing weight anddepth & width increases as specified by user.)
Increases based on footing Depth . . . .
Increases based on footing Width . . .
Footing base depth below soil surfaceAllowable Soil Bearing ksf
Increase Bearing By Footing Weight
Coefficient of Soil/Concrete Friction
Adjusted Allowable Soil Bearing
Soil Passive Sliding Resistance pcf Allowable pressure increase per foot ksf
when base of footing is below ft
Allowable pressure increase per foot ksf
when maximum length or width is greater than ft
(Uses entry for "Footing base depth below soil surface" for force)
Maximum Allowed Bearing Pressure 10.0 ksf
(A value of zero implies no limit)
ft
Dimensions & Reinforcing
Distance Left of Column #1 =
=
=
0.50 ft
Between Columns 20.0 ft
Distance Right of Column #2 0.50 ft
Total Footing Length =21.0
Col #1
ft
=
2.0Footing Width =ft
Pedestal dimensions...
Col #2
Sq. Dim.6.0 6.0 in=
Height in=
in^2
Footing Thickness 18.0 in in^2
Rebar Center to Concrete Edge @ Top 3.0 in
Rebar Center to Concrete Edge @ Bottom 3.0 in
=
=
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
Bottom Bars
Size #
As As
Count
1.240 0.7776 in^2
Req'dProvided
0.7776 in^2Bars Btwn ColsBottom Bars 1.240
1.240 0.7776 in^2
Top Bars in^21.240 0.7776
Bars Right of Col #2
Top Bars 1.240 0.7776
Top Bars 1.240 0.7776
Bottom Bars
Bars left of Col #1
Applied Loads
Applied @ Left Column
Axial Load Downward
Moment (+CW)=
Shear (+X)=
S E HWLDLr
k
Applied @ Right Column
=
k-ft
Axial Load Downward
k-ft
k
k
Moment (+CW)=
Shear (+X)=
=-2.751
5.393
k
Overburden =
128
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-2.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
DESIGN SUMMARY Design OK
Governing Load CombinationFactor of Safety Item Applied Capacity
PASS 0.3207 Soil Bearing 1.026 ksf 3.20 ksf +D+0.70E
PASS 4.321 Overturning 39.477 k-ft 170.570 k-ft +0.60D+0.70E
PASS No Sliding Sliding 0.0 k 11.157 k No Sliding
PASS 10.303 Uplift 1.926 k 19.840 k +0.60D+0.70E
Utilization Ratio Item Applied Capacity Governing Load Combination
PASS 0.000380 Flexure - Right of Col #2 - Top
Flexure - Left of Col #1 - Top -0.04796 k-ft
No Bending Flexure - Left of Col #1 - Bottom 0.0 k-ft
+1.20D+E
PASS
0.0 N/A
PASS
k-ft
Flexure - Between Cols - Top 81.156-11.324 k-ft0.1395
+0.90D+E
k-ft
Flexure - Between Cols - Bottom 2.945 k-ft0.03629 81.156 k-ft
-0.03087 k-ft 81.156 k-ft +1.40D
PASS No Bending Flexure - Right of Col #2 - Bottom 0.0 k-ft 0.0 k-ft N/A
PASS 0.03279 1-way Shear - Col #1 3.111 psi 94.868 psi +1.20D+E
PASS 0.08939 1-way Shear - Col #2 8.480 psi 94.868 psi +0.90D+E
PASS 0.01720 2-way Punching - Col #1 3.264 psi 189.737 psi +1.20D+E
2-way Punching - Col #2 5.236 psi 189.737 psi +1.20D+E
0.000591 +1.20D+EPASS
PASS
81.156 k-ft
PASS 0.02760
Soil Bearing
Eccentricity Actual Soil Bearing Stress Actual / Allow
Total Bearing @ Left Edge @ Right Edgefrom Ftg CL Allowable RatioLoad Combination...
D Only 25.01 0.60 0.60 3.20 0.186kftksfksfksf0.000
+0.60D 21.36 0.51 0.51 3.20 0.159kftksfksfksf0.000
+D+0.70E 26.86 0.25 1.03 3.20 0.321kftksfksfksf2.122
+D+0.5250E 26.40 0.34 0.92 3.20 0.287kftksfksfksf1.620
+0.60D+0.70E 23.21 0.17 0.94 3.20 0.294kftksfksfksf2.457
Moments about Left Edge Moments about Right Edgek-ft k-ft
Overturning Stability
Load Combination...Overturning Resisting Ratio Overturning Resisting Ratio
D Only 0.00 0.00 999.000 0.00 0.00 999.000
+0.60D 0.00 0.00 999.000 0.00 0.00 999.000
+D+0.70E 0.96 358.53 372.360 39.48 283.03 7.169
+D+0.5250E 0.72 339.18 469.688 29.61 282.55 9.543
+0.60D+0.70E 0.96 246.07 255.566 39.48 170.57 4.321
Sliding Stability
Load Combination...Sliding Force Resisting Force Sliding SafetyRatio
D Only 0.00 11.16 999kk
+0.60D 0.00 7.97 999kk
+D+0.70E 0.00 11.71 999kk
+D+0.5250E 0.00 11.57 999kk
+0.60D+0.70E 0.00 8.52 999kk
129
Project:
Project No:
By:
Date:Revision:Page:
130
R-3.1-FTG:
CYPRESS FIRE STATION
23005.10
JS/CHP
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
SF-2A
2'-0" WIDE x 24" THK
(5) #5
(5) #5
6' -6"
6
2A2A
2B
SF-2A
5
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-3.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Analysis/Design Settings
YesCalculate footing weight as dead load ?
NoCalculate Pedestal weight as dead load ?
4.0
60.0
3,605.0 ksi
145.0 0.00180
1.0
1.0
pcf
Min. Overturning Safety Factor : 1
Ec : Concrete Elastic Modulus
Min. Sliding Safety Factor : 1
Concrete Density Min Allow % Temp Reinf (based on thick)
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf (based on 'd')
0.90
0.750
: Phi Values Flexure :
Shear :I
Soil Information
Soil Bearing Increase3.20
No
250.0
0.30
5.0
3.20 ksf
(Allowable Soil Bearing adjusted for footing weight anddepth & width increases as specified by user.)
Increases based on footing Depth . . . .
Increases based on footing Width . . .
Footing base depth below soil surfaceAllowable Soil Bearing ksf
Increase Bearing By Footing Weight
Coefficient of Soil/Concrete Friction
Adjusted Allowable Soil Bearing
Soil Passive Sliding Resistance pcf Allowable pressure increase per foot ksf
when base of footing is below ft
Allowable pressure increase per foot ksf
when maximum length or width is greater than ft
(Uses entry for "Footing base depth below soil surface" for force)
Maximum Allowed Bearing Pressure 10.0 ksf
(A value of zero implies no limit)
ft
Dimensions & Reinforcing
Distance Left of Column #1 =
=
=
0.50 ft
Between Columns 5.50 ft
Distance Right of Column #2 0.50 ft
Total Footing Length =6.50
Col #1
ft
=
2.0Footing Width =ft
Pedestal dimensions...
Col #2
Sq. Dim.6.0 6.0 in=
Height in=
in^2
Footing Thickness 24.0 in in^2
Rebar Center to Concrete Edge @ Top 3.0 in
Rebar Center to Concrete Edge @ Bottom 3.0 in
=
=
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
Bottom Bars
Size #
As As
Count
1.240 1.037 in^2
Req'dProvided
1.037 in^2Bars Btwn ColsBottom Bars 1.240
1.240 1.037 in^2
Top Bars in^21.240 1.037
Bars Right of Col #2
Top Bars 1.240 1.037
Top Bars 1.240 1.037
Bottom Bars
Bars left of Col #1
Applied Loads
Applied @ Left Column
Axial Load Downward
Moment (+CW)=
Shear (+X)=
S E HWLDLr
k
Applied @ Right Column
=
k-ft
Axial Load Downward
k-ft
k
k
Moment (+CW)=
Shear (+X)=
=-2.003
3.805
k
Overburden =0.70
131
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-3.1 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
DESIGN SUMMARY Design OK
Governing Load CombinationFactor of Safety Item Applied Capacity
PASS 0.5872 Soil Bearing 1.879 ksf 3.20 ksf +D+0.70E
PASS 3.142 Overturning 8.413 k-ft 26.428 k-ft +0.60D+0.70E
PASS No Sliding Sliding 0.0 k 7.756 k No Sliding
PASS 7.407 Uplift 1.402 k 10.386 k +0.60D+0.70E
Utilization Ratio Item Applied Capacity Governing Load Combination
PASS 0.000521 Flexure - Right of Col #2 - Top
Flexure - Left of Col #1 - Top -0.1086 k-ft
No Bending Flexure - Left of Col #1 - Bottom 0.0 k-ft
+1.20D+E
PASS
0.0 N/A
PASS
k-ft
Flexure - Between Cols - Top 114.636-1.658 k-ft0.01446
+0.90D+E
k-ft
Flexure - Between Cols - Bottom 0.1250 k-ft0.001091 114.636 k-ft
-0.05972 k-ft 114.636 k-ft +1.40D
PASS 0.000313 Flexure - Right of Col #2 - Bottom 0.03586 k-ft 114.636 k-ft +0.90D+E
PASS 0.01328 1-way Shear - Col #1 1.260 psi 94.868 psi +0.90D+E
PASS 0.01246 1-way Shear - Col #2 1.182 psi 94.868 psi +1.20D+E
PASS 0.005268 2-way Punching - Col #1 0.9996 psi 189.737 psi +1.40D
2-way Punching - Col #2 1.663 psi 189.737 psi +0.90D+E
0.000948 +1.20D+EPASS
PASS
114.636 k-ft
PASS 0.008765
Soil Bearing
Eccentricity Actual Soil Bearing Stress Actual / Allow
Total Bearing @ Left Edge @ Right Edgefrom Ftg CL Allowable RatioLoad Combination...
D Only 12.87 0.99 0.99 3.20 0.309kftksfksfksf0.000
+0.60D 7.72 0.59 0.59 3.20 0.186kftksfksfksf0.000
+D+0.70E 14.13 0.30 1.88 3.20 0.587kftksfksfksf0.791
+D+0.5250E 13.82 0.47 1.66 3.20 0.518kftksfksfksf0.607
+0.60D+0.70E 8.98 0.00 1.49 3.20 0.466kftksfksfksf1.245
Moments about Left Edge Moments about Right Edgek-ft k-ft
Overturning Stability
Load Combination...Overturning Resisting Ratio Overturning Resisting Ratio
D Only 0.00 0.00 999.000 0.00 0.00 999.000
+0.60D 0.00 0.00 999.000 0.00 0.00 999.000
+D+0.70E 0.70 57.81 82.460 8.41 43.16 5.130
+D+0.5250E 0.53 53.81 102.348 6.31 42.83 6.788
+0.60D+0.70E 0.70 41.08 58.594 8.41 26.43 3.142
Sliding Stability
Load Combination...Sliding Force Resisting Force Sliding SafetyRatio
D Only 0.00 7.76 999kk
+0.60D 0.00 6.25 999kk
+D+0.70E 0.00 8.13 999kk
+D+0.5250E 0.00 8.04 999kk
+0.60D+0.70E 0.00 6.63 999kk
132
Project:
Project No:
By:
Date:Revision:Page:
133
R-3.2-FTG:
CYPRESS FIRE STATION
23005.10
JS/CHP
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
SF-2A
2'-0" WIDE x 24" THK
(5) #5
(5) #5
5' -4"
6
2A2A
SF-2A
1
S2.01
TYP.
5
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-3.2 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Analysis/Design Settings
YesCalculate footing weight as dead load ?
NoCalculate Pedestal weight as dead load ?
4.0
60.0
3,605.0 ksi
145.0 0.00180
1.0
1.0
pcf
Min. Overturning Safety Factor : 1
Ec : Concrete Elastic Modulus
Min. Sliding Safety Factor : 1
Concrete Density Min Allow % Temp Reinf (based on thick)
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf (based on 'd')
0.90
0.750
: Phi Values Flexure :
Shear :I
Soil Information
Soil Bearing Increase3.20
No
250.0
0.30
5.0
3.20 ksf
(Allowable Soil Bearing adjusted for footing weight anddepth & width increases as specified by user.)
Increases based on footing Depth . . . .
Increases based on footing Width . . .
Footing base depth below soil surfaceAllowable Soil Bearing ksf
Increase Bearing By Footing Weight
Coefficient of Soil/Concrete Friction
Adjusted Allowable Soil Bearing
Soil Passive Sliding Resistance pcf Allowable pressure increase per foot ksf
when base of footing is below ft
Allowable pressure increase per foot ksf
when maximum length or width is greater than ft
(Uses entry for "Footing base depth below soil surface" for force)
Maximum Allowed Bearing Pressure 10.0 ksf
(A value of zero implies no limit)
ft
Dimensions & Reinforcing
Distance Left of Column #1 =
=
=
1.0 ft
Between Columns 4.330 ft
Distance Right of Column #2 1.0 ft
Total Footing Length =6.330
Col #1
ft
=
2.0Footing Width =ft
Pedestal dimensions...
Col #2
Sq. Dim.6.0 6.0 in=
Height in=
in^2
Footing Thickness 24.0 in in^2
Rebar Center to Concrete Edge @ Top 3.0 in
Rebar Center to Concrete Edge @ Bottom 3.0 in
=
=
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
4.0 5
Bottom Bars
Size #
As As
Count
1.240 1.037 in^2
Req'dProvided
1.037 in^2Bars Btwn ColsBottom Bars 1.240
1.240 1.037 in^2
Top Bars in^21.240 1.037
Bars Right of Col #2
Top Bars 1.240 1.037
Top Bars 1.240 1.037
Bottom Bars
Bars left of Col #1
Applied Loads
Applied @ Left Column
Axial Load Downward
Moment (+CW)=
Shear (+X)=
S E HWLDLr
k
Applied @ Right Column
=
k-ft
Axial Load Downward
k-ft
k
k
Moment (+CW)=
Shear (+X)=
=-2.134
3.640
k
Overburden =0.70
134
Combined Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:R-3.2 FTG
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
DESIGN SUMMARY Design OK
Governing Load CombinationFactor of Safety Item Applied Capacity
PASS 0.5396 Soil Bearing 1.727 ksf 3.20 ksf +D+0.70E
PASS 3.309 Overturning 7.962 k-ft 26.349 k-ft +0.60D+0.70E
PASS No Sliding Sliding 0.0 k 7.655 k No Sliding
PASS 6.740 Uplift 1.494 k 10.068 k +0.60D+0.70E
Utilization Ratio Item Applied Capacity Governing Load Combination
PASS 0.001590 Flexure - Right of Col #2 - Top
Flexure - Left of Col #1 - Top -0.5676 k-ft
No Bending Flexure - Left of Col #1 - Bottom 0.0 k-ft
+1.20D+E
PASS
0.0 N/A
PASS
k-ft
Flexure - Between Cols - Top 114.636-0.7604 k-ft0.006633
+0.90D+E
k-ft
Flexure - Between Cols - Bottom 0.3880 k-ft0.003385 114.636 k-ft
-0.1822 k-ft 114.636 k-ft +1.40D
PASS 0.003715 Flexure - Right of Col #2 - Bottom 0.4259 k-ft 114.636 k-ft +0.90D+E
PASS 0.005515 1-way Shear - Col #1 0.5232 psi 94.868 psi +1.40D
PASS 0.005515 1-way Shear - Col #2 0.5232 psi 94.868 psi +1.40D
PASS 0.002076 2-way Punching - Col #1 0.3939 psi 189.737 psi +1.40D
2-way Punching - Col #2 2.074 psi 189.737 psi +0.90D+E
0.004951 +1.20D+EPASS
PASS
114.636 k-ft
PASS 0.01093
Soil Bearing
Eccentricity Actual Soil Bearing Stress Actual / Allow
Total Bearing @ Left Edge @ Right Edgefrom Ftg CL Allowable RatioLoad Combination...
D Only 12.53 0.99 0.99 3.20 0.309kftksfksfksf-0.000
+0.60D 7.52 0.59 0.59 3.20 0.186kftksfksfksf0.000
+D+0.70E 13.59 0.42 1.73 3.20 0.540kftksfksfksf0.644
+D+0.5250E 13.32 0.56 1.54 3.20 0.482kftksfksfksf0.493
+0.60D+0.70E 8.57 0.02 1.33 3.20 0.416kftksfksfksf1.021
Moments about Left Edge Moments about Right Edgek-ft k-ft
Overturning Stability
Load Combination...Overturning Resisting Ratio Overturning Resisting Ratio
D Only 0.00 0.00 999.000 0.00 0.00 999.000
+0.60D 0.00 0.00 999.000 0.00 0.00 999.000
+D+0.70E 1.49 53.25 35.647 7.96 42.22 5.302
+D+0.5250E 1.12 49.85 44.498 5.97 41.58 6.963
+0.60D+0.70E 1.49 37.38 25.025 7.96 26.35 3.309
Sliding Stability
Load Combination...Sliding Force Resisting Force Sliding SafetyRatio
D Only 0.00 7.66 999kk
+0.60D 0.00 6.19 999kk
+D+0.70E 0.00 7.97 999kk
+D+0.5250E 0.00 7.89 999kk
+0.60D+0.70E 0.00 6.51 999kk
135
Project:
Project No:
By:
Date:Revision:Page:
136
FTG-1:
CYPRESS FIRE STATION
23005.10
JS/CHP
MARK:
DIMENSIONS:
BOT. REINF.:
TOP REINF.:
F-25
2'-6" x 18" THK
(4) #5 E/W
-
6x6
F-25
5
General Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:FTG-1
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Code References
Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used : ASCE 7-16
General Information
Material Properties Soil Design Values
2,500.0
Analysis Settings
250.0
ksi No
ksfAllowable Soil Bearing =
=
4.0
60.0
3,605.0
145.0
=0.30Flexure=0.90
Shear =
ValuesM
0.00180
5.0
Soil Passive Resistance (for Sliding)
1.0
=
Increases based on footing plan dimension
Add Pedestal Wt for Soil Pressure No:
Use Pedestal wt for stability, mom & shear No:
Allowable pressure increase per foot of depth
=ksfwhen max. length or width is greater than
=ft
:
=
Add Ftg Wt for Soil Pressure Yes
Yes:Use ftg wt for stability, moments & shears
when footing base is below ft
pcf Increase Bearing By Footing Weight
=pcf
Min. Overturning Safety Factor
=
: 1
Increases based on footing Depth0.750
=
Soil/Concrete Friction Coeff.
Ec : Concrete Elastic Modulus
=
=Footing base depth below soil surface ft
=Allow press. increase per foot of depth ksf
=
: 11.0Min. Sliding Safety Factor =
=
Concrete Density
=
Min Allow % Temp Reinf.
ksif'c : Concrete 28 day strength
fy : Rebar Yield ksi
Min Steel % Bending Reinf.
Soil Density =110.0 pcf
#
Dimensions
Width parallel to X-X Axis 2.50 ft
Length parallel to Z-Z Axis
=
2.50 ft
=Pedestal dimensions...
px : parallel to X-X Axis in
pz : parallel to Z-Z Axis in
Height ==
in
Footing Thickness
=
18.0 in=
Rebar Centerline to Edge of Concrete...
=inat Bottom of footing 3.0
Reinforcing
#
Bars parallel to X-X Axis
Reinforcing Bar Size
=
5
Number of Bars
=
4.0
Bars parallel to Z-Z Axis
Reinforcing Bar Size =5
Number of Bars =4.0
Bandwidth Distribution Check (ACI 15.4.4.2)
Direction Requiring Closer Separation
n/a
# Bars required within zone n/a
# Bars required on each side of zone n/a
Applied Loads
2.10 1.660
D Lr
ksf
L S
P : Column Load
OB : Overburden =
k
W E
M-zz
V-x
=
=k
V-z k
M-xx =
k-ft=
k-ft
H
=
137
General Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:FTG-1
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
PASS n/a Sliding - X-X 0.0 k 0.0 k No Sliding
PASS n/a Sliding - Z-Z 0.0 k 0.0 k No Sliding
DESIGN SUMMARY Design OK
Governing Load CombinationMin. Ratio Item Applied Capacity
PASS 0.000482 Soil Bearing 1.204 ksf 2,500.0 ksf +D+Lr about Z-Z axis
PASS n/a Overturning - X-X 0.0 k-ft 0.0 k-ft No Overturning
PASS n/a Overturning - Z-Z 0.0 k-ft 0.0 k-ft No Overturning
PASS n/a Uplift 0.0 k 0.0 k No Uplift
PASS 0.01981 Z Flexure (+X)0.6470 k-ft/ft 32.666 k-ft/ft +1.20D+1.60Lr
PASS 0.01981 Z Flexure (-X)0.6470 k-ft/ft 32.666 k-ft/ft +1.20D+1.60Lr
PASS 0.01981 X Flexure (+Z)0.6470 k-ft/ft 32.666 k-ft/ft +1.20D+1.60Lr
PASS 0.01981 X Flexure (-Z)0.6470 k-ft/ft 32.666 k-ft/ft +1.20D+1.60Lr
PASS n/a 1-way Shear (+X)0.0 psi 94.868 psi n/a
PASS 0.0 1-way Shear (-X)0.0 psi 0.0 psi n/a
PASS n/a 1-way Shear (+Z)0.0 psi 94.868 psi n/a
PASS n/a 1-way Shear (-Z)0.0 psi 94.868 psi n/a
PASS n/a 2-way Punching 4.313 psi 94.868 psi +1.20D+1.60Lr
Detailed Results
Rotation Axis &ZeccXecc Actual Soil Bearing Stress @ Location Actual / Allow
Soil Bearing
(in)Gross Allowable Bottom, -Z Top, +Z Left, -X Right, +X RatioLoad Combination...
X-X, D Only 2,500.0 n/a0.9385 0.9385 n/a 0.0000.0n/a
X-X, +D+Lr 2,500.0 n/a1.204 1.204 n/a 0.0000.0n/a
X-X, +D+0.750Lr 2,500.0 n/a1.138 1.138 n/a 0.0000.0n/a
X-X, +0.60D 2,500.0 n/a0.5631 0.5631 n/a 0.0000.0n/a
Z-Z, D Only 2,500.0 0.9385n/a n/a 0.9385 0.000n/a0.0
Z-Z, +D+Lr 2,500.0 1.204n/a n/a 1.204 0.000n/a0.0
Z-Z, +D+0.750Lr 2,500.0 1.138n/a n/a 1.138 0.000n/a0.0
Z-Z, +0.60D 2,500.0 0.5631n/a n/a 0.5631 0.000n/a0.0
Flexure Axis & Load Combination in^2 in^2 in^2 k-ft
As Req'd
Footing Flexure
Tension
k-ft
Actual As StatusMuSide
Surface
Gvrn. As Phi*Mn
X-X, +1.40D 0.3675 +Z Bottom 0.3888 AsMin 0.4960 32.666 OK
X-X, +1.40D 0.3675 -Z Bottom 0.3888 AsMin 0.4960 32.666 OK
X-X, +1.20D+0.50Lr 0.4188 +Z Bottom 0.3888 AsMin 0.4960 32.666 OK
X-X, +1.20D+0.50Lr 0.4188 -Z Bottom 0.3888 AsMin 0.4960 32.666 OK
X-X, +1.20D 0.3150 +Z Bottom 0.3888 AsMin 0.4960 32.666 OK
X-X, +1.20D 0.3150 -Z Bottom 0.3888 AsMin 0.4960 32.666 OK
X-X, +1.20D+1.60Lr 0.6470 +Z Bottom 0.3888 AsMin 0.4960 32.666 OK
X-X, +1.20D+1.60Lr 0.6470 -Z Bottom 0.3888 AsMin 0.4960 32.666 OK
X-X, +0.90D 0.2363 +Z Bottom 0.3888 AsMin 0.4960 32.666 OK
X-X, +0.90D 0.2363 -Z Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +1.40D 0.3675 -X Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +1.40D 0.3675 +X Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +1.20D+0.50Lr 0.4188 -X Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +1.20D+0.50Lr 0.4188 +X Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +1.20D 0.3150 -X Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +1.20D 0.3150 +X Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +1.20D+1.60Lr 0.6470 -X Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +1.20D+1.60Lr 0.6470 +X Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +0.90D 0.2363 -X Bottom 0.3888 AsMin 0.4960 32.666 OK
Z-Z, +0.90D 0.2363 +X Bottom 0.3888 AsMin 0.4960 32.666 OK
One Way Shear
Vu @ +XLoad Combination...Vu @ -X Vu @ -Z Vu @ +Z Vu:Max Vu / Phi*VnPhi Vn Status
+1.40D 0.00 0.00 0.00 0.00 0.00 94.87 0.00psipsipsipsipsipsi OK
+1.20D+0.50Lr 0.00 0.00 0.00 0.00 0.00 94.87 0.00psipsipsipsipsipsi OK
+1.20D 0.00 0.00 0.00 0.00 0.00 94.87 0.00psipsipsipsipsipsi OK
+1.20D+1.60Lr 0.00 0.00 0.00 0.00 0.00 94.87 0.00psipsipsipsipsipsi OK
+0.90D 0.00 0.00 0.00 0.00 0.00 94.87 0.00psipsipsipsipsipsi OK
138
General Footing
LIC# : KW-06017527, Build:20.23.2.14 HOLMES STRUCTURES (c) ENERCALC INC 1983-2022
DESCRIPTION:FTG-1
Project File: Cypress_Gravity.ec6
Project Title:
Engineer:
Project ID:
Project Descr:
Vu / Phi*Vn
Two-Way "Punching" Shear All units k
StatusVuPhi*VnLoad Combination...
+1.40D 2.45 189.74 0.01291 OKpsipsi
+1.20D+0.50Lr 2.79 189.74 0.01471 OKpsipsi
+1.20D 2.10 189.74 0.01107 OKpsipsi
+1.20D+1.60Lr 4.31 189.74 0.02273 OKpsipsi
+0.90D 1.58 189.74 0.008301 OKpsipsi
139