PROJECT DATA
<br />PROJECT LOCATION/ADDRESS:
<br />1409 MERIDAY LN
<br />SANTA ANA, CA 92706
<br />APN: 00407104 ZONE:R-1 (E) RESIDENCE AREA: 1,247 SF
<br />LOT SIZE: 6,120 SF NO. OF STORIES:(E) 1 STORY (N) AREA:463 SF
<br />TOTAL (N) AREA: 1,710 SF
<br />CONTRUCTION TYPE:VB NON SPKLRD
<br />OCC GROUP:R-3/U SEPTIC Y/N:NO
<br />LEGAL DESCRIPTION: LOT 50 OF COLLEGE CREST, TRACT NO. 1925, IN THE CITY OF SANTA
<br />ANA, COUNTY OF ORANGE, STATE OF CA, AS SHOWN ON A MAP RECORED IN BOOK 53,
<br />PAGES 9 AND 8, OF MISC MAPS, IN THE OFFICE OF THE COUNTRY RECORDER OF SAID
<br />COUNTY.
<br />LOT COVERAGE: LOT: 6,120 SF (N) TOTAL SF: (E)1,247 + (E)390 + (N)401 + (N)62 390 = 2,099 SF.
<br />34%<35% MAX
<br />SCOPE OF WORK:
<br />401 SF ADDITION TO BACK HALF OF PROPERTY (ENLARGING LIVING ROOM AND
<br />BEDROOM. MODIFYING LAUNDRY AREA & CONVERTING WATER HEATER TO GAS
<br />TANKLESS. 62 SF ADDITION TO FRONT BEDROOM BATH AREA. (E) COVERED
<br />PATIO WILL BE DEMOLISHED
<br />PROJECT DIRECTORY
<br />APPLICANT / OWNER:
<br />JAVIER NICANOR
<br />1409 MERIDAY LN
<br />SANTA ANA, CA 92706
<br />PHONE: 714.600.2445
<br />EMAIL: JAVI.NICANOR86@GMAIL.COM
<br />DESIGNER:
<br />LAM NGUYEN
<br />2476 N BEECHWOOD ST
<br />ORANGE, CA 92865
<br />PHONE: 714.657.9333
<br />EMAIL: CUMULUSDESIGNBUILD@GMAIL.COM
<br />STRUCTURAL / TITLE24:
<br />TRUONG DONG
<br />12682 HOOVER ST.
<br />GARDEN GROVE, CA 92841
<br />PHONE: 714.617.5979
<br />EMAIL: TROY@DONGENGINEERING.COM
<br />GENERAL NOTES
<br />DOCUMENT /VERIFICATION
<br />THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL EXISTING CONDITIONS, CONTRACT DOCUMENTS, AND DIMENSIONS FOR
<br />ACCURACY AND CONFIRMING THAT THE WORK IS BUILDABLE AS SHOWN BEFORE PROCEEDING, IE THERE ARE ANY QUESTIONS OR
<br />DEVIATIONS IN THE ’’AS-BUILTS”THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING IMMEDIATE CLARIFICATION, FROM THE ARCHITECT/
<br />DESIGNER. IF THE WORK IS STARTED PRIOR TO CLARIFICATION, THE GENERAL AND SUBCONTRACTORS PROCEED AT THEIR OWN RISK.
<br />CONSULT WITH ARCHITECT/DESIGNER REGARDING ANY SUSPECTED ERRORS, OMISSIONS OR CHANGES ON PLANS BEFORE
<br />PROCEEDING WITH THE WORK. THE CONTRACTOR SHALL INSTALL ALL MATERIALS AND EQUIPMENT PER THE MANUFACTURERS
<br />RECOMMENDATIONS. ANY CONFLICT WITH THE AS-BUILTS OR PLANS AND SPECIFICATIONS SHALL BE BROUGHT TO THE
<br />ARCHITECT’S/DESIGNER'S ATTENTION FOR IMMEDIATE RECONCILIATION PRIOR TO PROCEEDING WITH THE WORK. DO NOT SCALE
<br />DRAWINGS. UNLESS OTHERWISE NOTED, PLAN DIMENSIONS INTERIOR AND EXTERIOR ARE TO FACE OF STUD OR FACE OF CONCRETE
<br />WALLS. VERIFY ALL ROUGH-IN DIMENSIONS FOR WINDOWS, DOORS, PLUMBING, TO COMMENCEMENT OF WORK. NOTIFY ARCHITECT OF
<br />ELECTRICAL FIXTURES AND APPLIANCES PRIOR ANY DISCREPANCIES IN THE WORK OR DIMENSIONAL TOLERANCES REQUIRED.
<br />ARCHITECT SHALL BE NOTIFIED IMMEDIATELY WHEN ANY DISCREPANCY WITH STRUCTURAL DRAWINGS IS FOUND. ALL DRAWINGS MAY
<br />HAVE TO BE MODIFIED UPON REMOVAL OF EXISTING CONSTRUCTION. DO NOT PROCEED WITH WORK IN QUESTION UNTIL ARCHITECT
<br />ISSUES DIRECTIONS
<br />EXISTING CONDITIONS
<br />EXISTING CONDITIONS ARE IDENTIFIED AS (E) ON THE DRAWINGS. NOTIFY THE ARCHITECT AND OWNER OF ANY EXISTING AREAS OF
<br />DEMO WITH WOOD SHOWING EVIDENCE OF ACTIVE WATER, WATER LEAKS, TERMITES OR DRY ROT
<br />CONSTRUCTABILITY
<br />AFTER DEMOLITION AND PRIOR TO CONSTRUCTION THE CONTRACTOR IS TO VERIFY THE CONDITIONS OF THE REMAINING
<br />CONSTRUCTION FOR CRACKS, CHANGES IN ELEVATION (SLOPE) AND ANY STRUCTURAL DEFECTS, AND NOTIFY THE ARCHITECT OF ANY
<br />AND ALL DEFECTS
<br />CONSTRUCTION STANDARDS
<br />CONSTRUCTION SHALL CONFORM TO STANDARD CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS GENERAL INDUSTRY SAFETY
<br />ORDER, TITLE 8. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. SAFETY OF ALL PRESENT
<br />ON THE JOB SITE IS THE CONTRACTOR’S RESPONSIBILITY
<br />ALTERATIONS
<br />WHEN ALTERATIONS, STRUCTURAL REPAIRS, MODICATIONS OR ADDITIONS ARE MADE TO AN EXISTING BUIDLING, THAT BUILDING, OR
<br />PROTION OF THE BUILDING AFFECTED IS REQD TO COMPLY WITH ALL OF THE REQUIREMENTS FOR NEW BUILDINS, PER SECTION 1134B.2.
<br />TEMPORARY CONSTRUCTION
<br />CONTRACTOR IS RESPONSIBLE TO VERIFY ALL FIELD CONDITIONS AND PROVIDE FOR ADEQUATE BRACING, SUPPORTS AND SHORING AS
<br />REQUIRED TO HOLD EXISTING WORK SECURELY IN PLACE AND TO SUSTAIN ALL EXISTING LOADS DURING ERECTION AND UNTIL
<br />SUBSEQUENT CONSTRUCTION IS COMPLETED. ALL SHORING AND BRACING SHALL BE IN ACCORDANCE WITH CURRENT REQUIREMENTS
<br />OF CALOSHA THE INDUSTRIAL ACCIDENT COMMISSION OF THE STATE OF CALIFORNIA AND OTHER PUBLIC AGENCIES HAVING
<br />JURISDICTION. THE DRAWINGS DO NOT INDICATE METHODS OF BRACING AND TEMPORARY SHORING REQUIRED TO PERFORM THE
<br />DEMOLITION WORK.
<br />RECYCLING AND DEBRIS
<br />CONTRACTOR TO REMOVE AND DISPOSE OF ALL RECYCLABLE DEBRIS IN A WASTE FACILITY APPROVED BY THE GOVERNING AGENCY.
<br />ALL RECEIPTS FOR RECYCLING WILL NEED TO BE MAINTAINED FOR RECORDS AND AGENCY REIMBURSEMENT. THE CONTRACTOR SHALL
<br />TRANSPORT MATERIALS OFF SITE AND PROPERLY DISPOSED OF AT CITY APPROVED LOCATIONS IN ACCORDANCE WITH APPLICABLE
<br />LAWS
<br />AND REGULATIONS, UNLESS SPECIFIED BY THE OWNER
<br />GLAZING
<br />ALL GLAZING WITHIN THE FOLLOWING CONDITIONS WILL BE MADE OF TEMPERED GLASS.
<br />A. ALL GLAZING WITHIN 18”OF FINAL GRADE AND/OR WALKING SURFACE.
<br />B. WHERE THE BOTTOM EDGE OF WINDOW IS LESS THAN 60”OF A WALKING SURFACE.
<br />C. WALL GLAZING WITHIN A 24”ARC OF EITHER HORIZONTAL OR VERTICAL EDGE OF DOORS IN THE CLOSED POSITION.
<br />D. ALL GLAZING WITHIN A 24”ARC OF EITHER HORIZONTAL OR VERTICAL EDGE OF COOKING SURFACES.
<br />FINISH FLOOR
<br />’’FINISH FLOOR”REFERS TO TOP OF FINISH MATERIAL ATOP OF CONCRETE SLAB OR WOOD SUBLFOOR
<br />FRAMING
<br />ALL INTERIOR FRAME PARTITIONS TO BE 4”WOOD STUD @ 16”OC, UNO. WOOD MEMBERS IN CONTACT WITH CONCRETE, AND/OR
<br />EXPOSED TO WEATHER TO BE PRESSURE TREATED, TYPICAL.
<br />GYPSUM BOARD
<br />GYPSUM BOARD TO BE MECHANICALLY FASTENED WITH DRYWALL SCREWS THROUGHOUT.
<br />ELECTRICAL POWER
<br />DURING WORK TURN OFF ELECTRICAL POWER AND PROVIDE TEMPORARY POWER FOR CONSTRUCTION USE. IE CLIENT TO REMAIN AT
<br />RESIDENCE DURING CONSTRUCTION, PROVIDE SAFE PROVISIONS FOR POWER
<br />INSPECTIONS
<br />REQUEST FOR AN INSPECTION WILL BE MADE 48 HOURS IN ADVANCE. INSPECTIONS SHALL BE MADE ONCE WORK IS COMPLETE ,
<br />UTILIZING APPROVED AND STAMPED PLANS. CONTRACTOR SHALL BE REQUIRED TO HAVE THE APPROVED PLANS ON SITE PER CODE.
<br />CLEAN UP
<br />BROOM CLEAN AND READY THE AREA TO RECEIVE NEW WORKDRAWING SYMBOLS
<br />FIRE DEPARTMENT NOTES
<br />DEMOLITION AND CONSTRUCTION
<br />DEMOLITION AND CONSTRUCTION SHALL COMPLY w/ THE REQUIREMENTS OF
<br />CALIFORNIA FIRE CODE CHAPTER 14 TIRE SAFETY DURING CONSTRUCTION AND
<br />DEMOLITION." CONSTRUCTION SHALL ALSO CONFORM TO STANDARD CALIFORNIA
<br />DEPARTMENT OF INDUSTRIAL RELATIONS GENERAL INDUSTRY SAFETY ORDER, TITLE
<br />8. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR
<br />CONSTRUCTION SAFETY. SAFETY OF ALL PRESENT ON THE JOB SITE IS THE
<br />CONTRACTOR'S RESPONSIBILITY
<br />BUILDING ADDRESS
<br />NEW AND EXISTING BUILDINGS SHALL HAVE APPROVED ADDRESS NUMBERS,
<br />BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION
<br />THAT IS PLAINLY LEGIBLE AND VISIBLE FROM THE STREET OR ROAD FRONTING THE
<br />PROPERTY. THESE NUMBERS SHALL CONTRAST IN COLOR TO BACKGROUND.
<br />NUMBERS SHALL BE A MIN OF 4" HIGH w/ A MIN STOKE WIDTH OF 1/2", CFC SECTION
<br />505.1
<br />KEY BOX
<br />WHERE ACCESS TO OR w/IN A STRUCTURE OR AN AREA IS RESTRICTED BECAUSE OF
<br />SECURED OPENINGS OR WHERE IMMEDIATE ACCESS IS NECESSARY FOR LIFE-
<br />SAVING OR FIRE-FIGHTING PURPOSES, THE FIRE CODE OFFICIAL IS AUTHORIZED TO
<br />REQUIRE A KEY BOX TO BE INSTALLED IN AN APPROVED LOCATION. THE KEY BOX
<br />SHALL BE OF AN APPROVED TYPE AND SHALL CONTAIN KEY(S) TO GAIN NECESSARY
<br />ACCESS AS REQD BY THE EIRE CODE OFFICIAL, CFC SECTION 503.6
<br />CODE REFERENCES
<br />ALL DESIGN AND PLANS BASED ON THE 2022 CALIFORNIA (CRC), CALIFORNIA PLUMBING
<br />CODE (CPC), CALIFORNIA MECHANICAL CODE (CMC), CALIFORNIA ELECTRICAL CODE
<br />(CEC) AND 2022 CALIFORNIA ENERGY CODE AND CITY OF SANTA ANA MUNICIPAL CODE.
<br />THE STRUCTURAL ELEMENTS, WORKMANSHIP AND MATERIALS SHALL COMPLY WITH THE
<br />2022 EDITION OF CALIFORNIA BUILDING CODE (CBC)
<br />2022 CALIFORNIA BUILDING CODE (CBC)
<br />[2021 INTERNATIONAL BUILDING CODE (IBC)]
<br />2022 CALIFORNIA ELECTRICAL CODE (CEC)
<br />[2021 NATIONAL ELECTRICAL CODE (NEC)]
<br />2022 CALIFORNIA MECHANICAL CODE (CMC)
<br />[2021 UNIFORM MECHANICAL CODE (UMC)]
<br />2022 CALIFORNIA PLUMBING CODE (CPC)
<br />[2021 UNIFORM PLUMBING CODE (UPC)]
<br />2022 CALIFORNIA ENERGY CODE
<br />[2021 BUILDING ENERGY EFFICIENCY STANDARDS]
<br />2022 CALIFORNIA FIRE CODE (CFC)
<br />[2021 INTERNATIONAL FIRE CODE (IFC)]
<br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen Code)
<br />Scale
<br />Project number
<br />Date
<br />Drawn by
<br />Checked by
<br />LAM NGUYEN B.ARCH
<br />1/4" = 1'-0"
<br />1/
<br />2
<br />0
<br />/
<br />2
<br />0
<br />2
<br />6
<br />
<br />1
<br />1
<br />:
<br />1
<br />5
<br />:
<br />5
<br />2
<br />
<br />A
<br />M
<br />T-00
<br />TITLE SHEET
<br />25.006
<br />ADDITIONS & BATH
<br />REMODEL
<br />1409 MERIDAY LN
<br />05.29.2025
<br />LN
<br />LN
<br />SHEET INDEX
<br />TITLE
<br />T-00 TITLE SHEET
<br />T24
<br />T24.1 ENERGY CALCULATIONS
<br />T24.2 ENERGY CALCULATIONS
<br />CALGREEN
<br />CG-01 CALGREEN CODE
<br />CG-02 CALGREEN CODE
<br />VICINITY MAP PROJECT LOCATION
<br />SHEET INDEX
<br />ARCHITECTURE
<br />A-0.0 (E) & (N) SITE PLAN
<br />A-1.0 FLOOR PLAN
<br />A-1.1 DEMO PLAN & RCP
<br />A-2.0 ELEVATIONS & SECTIONS
<br />STRUCTURAL
<br />S0 GENERAL NOTES
<br />S1 FOUNDATION PLAN
<br />S2 ROOF FRAMING PLAN
<br />SD1 STRUCTURAL DETAILS
<br />SD2 STRUCTURAL DETAILS
<br />SD3 STRUCTURAL DETAILS
<br />No. Description Date
<br />01.20.2026
|