REGISTERED INSPECTOR'S DAILY REPORT
Forffi
5oo W- Warner Ave.
Crtv
Santa Ana
Voluntary Seismic Strengtheninq 10199744 Santa Ana
Tenant lmprovement
Firle alDesaiiDllo.Ttpe. qrade. source elc.)
MHP
eoniracloi
Premier
Jack Sparacio SPS
TYPE OF SAMPLE SLUMP QUANTITY IN SET ADDITIONAL REMARKS ON SAMPLES
Location: Wall Ledger at Purlins & Pillasters
- Observed epoxy 5/8" rods per details 1,2,12lS3.0
Location grid A,/28-42 ernbed 4112" & 42lA-R embed 51/2".
Holes clean, embed depths observed, & set in Hilti Hit RE 500 V3 epoxy. Exp.3/2020
OUALIIY CONTROL
CIIECKLIST
tr c.creDNwirHc,r
tr snwmJos
tr CHECKEDPERMtr
tr REMtuoemovEDPW
tr REMEwmsPEcFcanoNs
! REvEWEDREvousEPmrs
tr TESTPERToRMEoP€RsPEcs
tr coRFEc,NooFsA,{6s
EI sdPrEs srGED saFErY
tr CALED NSAMPLESFORPIC(UP
tr aLEFrcrENoEsNorED
! -*",
CERTIFICATION OF COMPLIANCE
ALL WORK LISTEOASOVE WAS INSPECTEOAS REOUIRED AY
TIEAPPROVEO PLAN. SPECIFICATIONS, AND GOVERNING CODE
CONT NUED ON NEXT PAGE n
r $"#.93A',8'JEi,yl',^li,
WORK DOES NOT COMPLY
TIME IN TIME OUT REG, HOURS o T HOURS SAMPLES
7:30 am .l :30 am 8.0
All inso€ctions ba$d on , minimum ol 4 houE and we. 4 houB - I holE oinimum ll
ihe insEclor rs c.lled io 6 oroiecl and no m* E Nriom6d a Mo nour ornrmum
chaEe wll be apdied B$s6 vqit O c. Ch€hisl.
Btc 5261928 ICC
Daro 5^ 5/19
"'o'""t*o 19-0554
TYPE OF
INSPECTION
REQUIRED
E Reanforced concreie
I P@slross6d concrote
! Reinfo.ced Masonry
E slrucrulal sreel
E Firs Proo,rno
E shotcrels
fl Qualitv conlrol
E Dnlbd ln AochorsIother Eooxv
TESTS PERFORMED
cC: Architec1. Emlner. Buildmq ofr.ial
AGENCY
www,kouryengineering.com FORM FR,20003 07/01/2015
INSPECTION SUM]'ARY- LOCATIONS OF WORK INSPECTEO, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROALEMS PROGRESS. REMARKS.
EIC, INCLUDE INFORMATION ABOUTAMOUNTS OF MATERIAL PTACED OR WORK PERFORMED, NUMBER & TYPE OF
TEST SAMPLES TAKEN, STRUCTURAL CONNECTIONS (WELDS MADE BOLTS TOROUEO) CHECKEO, ETC,
ENGINEERING
& TESTING, INC.
KOURY ENGINEERING
14280 EUCLID AVENUE
cHrNo, cA 91710
(24 Hou4 Cell: (310) 713-4005
Officer (909) 606-6111
Fax: (909) 606-6555
oare 5/16/19
o.,"o "" .l g-05S4
TYPE OF
INSPECTION
REOUIRED
E Reinrorced concrete
E Pr€stresssd Coocrets
E Reinforced Masonry
fl Sfiucluralsloel
EI shorcrote
E Oualllv Conlrol
fl orilod ln AnchorsIorher Epoxv
REGISTEREO INSPECTOR'S DAILY REPORT
trqrffis"i
500 W. Warner Ave
CrlV
Santa Ana
Voluntary Seismic Strenqtheninq 10199744 Sanla Ana
Tenant lmprovement
lVatenal D€scriDlion (lype qrade source. etc.)Enqineer
MHP
Premier
Jack Sparacio SPS
TESTS PERFORMED
TYPE OF SAMPLE SLUMP OUANTITY IN SET ADDITIONAL REi/lARKS ON SAMPLES
INSPECTION SUI'iIMARY- LOCATIONS OF WORK INSPECIEO, TEST SAMPLES fAKEN, WORK REJECTEO, JOA PROBLEMS. PROGRESS. REMARKS
ETC. INCLUDE INFORI\,4ATION AAOUTAMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMSER & TYPE OF
TEST SAMPLES TAKEN, STRUCTURAL CONNECTIONS NELDS MADE. BOLTS TOROUED) CHECKEO, ETC,
Location: Wall Ledger at Purlins & Pillasters
- Observed epoxy 5/8" rods per details 1 & 2/53.0
Location grid 28/A-B & Rl28-42,5/12" embed
Holes clean, embed depths observed, & set in Hilti Hit RE 500 V3 epoxy. Exp.3l2O2O
Epoxy work at G(id A-8128-42 Completed.
! cHEcxEoNwrBCrv
tr oNnMErcJos
tr dEcx€DPEnMr
! REvrEwEoAPmolEDPN
tr RNrEwFosP€crncAroNs
tr RwRsPRrylolsREPoRrs
tr rcfiPERFORMEDPERSPECS
E comerNooFs^upt€s
tr sr^,PrEssroRmsAELY
tr calLEohvwcsFoRParuP
tr aLoEF'c,ENc'EsNoroZ-*"
CERTIFICATION OF COMPLIANCE
ALL WORK LISTEOABOVE WAS INSPECTED AS REOIJIREO BY
THEAPPROVED PLAN, SPECIFICAIIONS, ANO GOV€RNING COOEr 1"9ffi3y3'J:",,ylli.
CONTINUEO ON NEXT PAGE
WORK OOES NOT COMPLY
IGNATURE OF REG]STEREO
B/C s261928 rcc
TlME IN III\,4E OUT REG, HOURS O,T, HOURS SAMPLES
1O:00 am 4.0
tul insDectons ba*d on a minioum ot 4 hou6 and over 4 houc - 3 hou6 minihum ll
!o a oo€cr and rc wo is oedornsd E M h@r n'nihum
Prer* v6fv o c dta.jJ, //- ..'
Kennv Holl
I
ccr Archftct, Enq neer, Blildlnq Offloal www.kouryengineering.com FORM FR-2000307/01/2015
OUALITY CONTROL
CHECKLIST
=
6:00 am
KOURY ENGINEERING
14280 EUCLID AVENUE
cHtNo, cA 91710
(24 Hour) Cell: (310) 713-4005
Office: (909) 606-6'1 1'1
Fax: (909) 606-6555
ENGINEERING
E TESTING, INC.
REGISTERED INSPECTOR'S DAILY REPORT
D"'" 19-05-31 Fri
"t*'o 19-0554
TYPE OF
INSPECTION
REQUIRED
n Roinforc€d Consete
E Prcsircssed Concrcle
E Roinrorced Masonrv
E structuralsreel
E Fn€ Prcorinq
E Sholcrete
E Oualitv Conlml
trr otner B-l
gSEWm;Cily
Santa Ana
Voluntary Seismic Strenghening "{olUbz+r 'Sb"8tBnn"
Y,fl?i3-**o$lq["t
Mn lertat De scr !!on tlvDe, arade source el( ]cable and bracl(ets 'ffiiijp
'Plaifii",
[ii3Fi'JSldT.oushrin
TESTS PERFORMED
TYPE OF SAMPLE SLUMP OUANTITY IN SET AODITIOIIAL REMARKS ON SAMPLES
!NSPECTION SUMMARY. LOCATIONS OF WORK INSPECTEO, TEST SAMPLES TAKEN. WORK REJECTED, JOB PROALEMS, PROGRESS, REMARKS
ETC. INCLUOE INFORI\,iATION ABOUTAMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER & ryPE OF
TEST SAMPLES TAKEN STRUCTURAL CONNECfIONS (WELDS MADE BOLTS TOROUEO) CHECKED, ETC,
I arrived at 7:00 and met with James Mendez. We started with grid 2842 x C-H complete. I watched the post and
. cable tention procedure and all is correct to approved plans and specs. (6 kips)
QUALITY CONTROL
CHECKLIST
tr
E
d"E'E*ED**o'-"^
d"E''E*€"s".c.c^*-s
tr R€v,EwEoPRlv'c,sREPoF S
tr TESTPERFORMEDPERSPECS
tr com€crNooFsaMetEs
E sqHrs sronEo SAFRY
E CAIL€DNSAMRESFoRPck@
tr a!crciENc,EsNoEo
M cffic"E"**"tr orHER
CERTIFICATION OF COMPLIANCE
ALL WORK LISTEOABOVE WAS INSPECTED AS REOUIREO SY
THE APPROVED PLAN SPECIFICATIONS. ANO GOVERNING CODE
I woRK coMpLrEs wlTH E woRK oo€s NorcoMPLY
APPROVED DOCUMENTS
B-l s322075 rcc
O,I HOURS SAMPLESTIME IN TII\.1E OUT REG HOURS
0700 1300 8
All insDections basd on a
CC Amhltect Enqin&r Buildinq Oni.i.l www,kouryengineering.com FORM FR-2000303/112015
KOURY ENGINEERING
14280 EUCLID AVENUE
CHINO, CA 91710
(24 Hou0 Cell: (310) 713-4005
Office: (909) 606-6111
Fax: (909) 606-6555
ENGINEERING
& TESTING, INC.
REGISTERED INSPECTOR'S DAILY REPORT
o"'" 'l9-06-03 Mon
Pro'ecr No. 19-0554
TYPE OF
INSPECTION
REQUIRED
E Rsrnfo.ced Concrete
E Preslressed Concreta
! Reinfo.ced l,lasonrv
E Sructumlsreel
E Fks Proo,ino
fl shorcrcre
E Qualiiy Conlrol
orher B-l 1 07
mb'W\l7i.*,.City
Santa Ana
Prorerr lrame
Voluntary Seasmic Stronghthening "I0'ibbz+q 'Sbiltuinn"
Y,fi".'13**."
oitlHp
lv ''sfffi"r
cpria"Hier
Desi gn Group
lliisFisSldtougnrin
TESTS PERFORMED
TYPE OF SAMPLE SLUMP QUANTITY IN SET ADDITIONAL REMARKS ON SAMPLES
INSPECTION SUMMARY. LOCATIONS OF WORK INSPECTED. TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS PROGRESS- REMARKS
ETC. INCLUDE INFORI\,{ATION ABOUTAMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER E TYPE OF
TEST SAMPLES TAXEN, STRUCIURAL CONNECTIONS (WELDS MADE. BOLTS TOROUED] CHECKED- ETC,
Arrived at 0700 and met with James Mendez. I watched the beam & cable tightening to (6 KIPS ) Allwork done today
is consistant with specs and approved plans. The area completed today is 2842XH-P.
QUALITY CONTROL
CHECKLIST
tr cHEc{EorNWrHcrY tr
M
tr TESIPERFORMEDPEfl SP€CS
E coRR€clNoocsMPL€S
E sMPtEssroREosaFELY
tr c&cDNsAwLEsFoRacruP
E rLmFrcENcEsNorEoM
E tr REVEwEoPREVousREPoRrs tr orHER
CERTIFICATION OF COMPLIAI{CE
ALL WORK LISTEO AAOVE WAS INSPECTED AS REQIIREO BY
rF E APPROVEO PLAN. SPECIFICATIONS, ANO GOVERNING CODE
I woqi coveLrEs wI H E woRK DoEs NoY roMPr Y
APPROVEO DOCUMENTS
lfi'rl
TIME IN III\,IE OUT REG. HOURS O.T, HOURS SAMPLES
0730 1330 8
A0 iNDeclio$ bas€d on a mBimum ol { iDUG and over 4 hou6 - a hou6
the '^soecl,or 's cdled lo a D.oiect and
clraoe will be aDolled. Aea* vonly O
Jacob KuliSIGNAIUR€ OF REGISTER
B-l 5322075
corrnueoor ruexr ence I
CC: richilecl, Enqrne€r BurdinQ Ofi.ial www.kouryengineering.com FORM FR,20003 03/1/2015
ENGINEERING
& TESTING, INC.
KOURY ENGINEERING
14280 EUCLID AVENUE
cHtNo, cA 91710
(24 Hour) Cell: (310) 713-4005
Office: (909) 606-6111
Faxr (909) 606-6555
Daro 614119
o''"o *o 19-0554
TYPE OF
INSPECTION
REQUIRED
fl neintorceo concrere
E Pr6str6ssed Concrele
E Reinlorc€d Masonry
ff siructuralsleel
! Fne Prcofinq
E shotcrere
E Oualilv Control
E Ddled ln AnchoEIorher EDoxV
REGISTERED INSPECTOR'S DAILY REPORT
500 W. Warner Ave
Cirv
Sanla Ana
Voluntarv Seismic Strenqtheninq 101 99744 Santa Ana
Tenant lmprovement
It4;terial Descriptiofl (lvpe, qrade. source etc.)
I\,4HP
Premier
Jack Sparacio SPS
TESTS PERFORMED
TYPE OF SAMPLE SLU MP OIIANTITY IN SET AOOITIONAL REMARKS ON SAMPLES
QUALIfY CONTROL
CHECKLIST
E cBEcKEo rNWrHclrr
E oNllME'oJos
tr ftEcxEo+N,r
tr REVIEWEOAPPROVEOPLAN
E REvMes%clac^noNs
u REvEwEoPFEMolrs REPoRrs
tr TESTPERFORM€OPERSPECS
I concrcrrc or sueirs
tr sailPtEssroREDsaFELY
tr c{EoNsAwrsFoFPcK@
n rLNrcENoEsNoreD
E -*-
CERIIFICATION OF COMPLIAI{CE
ALL !1/ORK LISTEO ABOVE WAS INSPECIEOAS REOUIREO BY
IHEAPPROVED PLAN, SPECIFICATIONS, AND GOVERN'NG COOE
I woRX CoMPLTES W]TH
APPROVED OOCUMENTS
CONIINUED ON NEX'T PAG€
TIME IN TIIUE OUT R€G, HOURS O,T. HOURS SAMPLES
11 :00 am 1 :00 pm 4.O
AJI inspeclions b.s.d on a mnrmum ot 4 r6u6 aod over 4 hou6 a houB ninimuh. ll
lhe hspecior is olred lo a Droi&t and no
.hsrae will be .pplied. Please venty O C
Jacob Kulick P.o|oct s!Dennbndonl
SIGNATURE OF REGISTERED I
alc
WOR( OOES NOT COMPLY
526'1928 tcc
CC. Archnel, E.qn4, BoildinF Ofiod www.kouryengineering,com FORM FR-20003 07/01/201s
INSPECTION SUMIIIARY. LoCATIoNS oF WORK INSPECTED, TEST SAMPLES TAKEN, woRK REJECTED, JoB PRoaLEMS, PRoGRESS REMARKS
ETC- INCLUDE INFORMATION ABOUTAI\,IOUNTS OF AIATERIAL PLACED OR WORK PERFORMED. NUMBER A TYPE OF
TEST SAMPLES TAKEN STRUCTURAL CONNECTIONS IWELDS MADE. BOLTS TOROUEDI CHECKED, ETC,
Location: Wall tie at Purlins.
- Observed epoxy 5/8" rods to existing perimeter walls each side of purlins per detail 3/53.0
Holes clean,6" embed, set in Hilti Hit RE 500 epoxy.
12 locations. Gtid 42/8, D, F, H, K, M, O, P-O. Grid 28lK, M, O, P-O.
Work above completed.
ttt
KOURY ENGINEERING
14280 EUCLID AVENUE
cHtNo, cA 91710
(24 Hour) Cell: (310) 713-4005
Office: (909) 606-6111
Fax: (909) 606-6555
ENGINEERING
A TESTING, INC,
REGISTERED INSPECTOR'S DAILY REPORT
D''" '19-06-04 Tues*""''" 19-0s54
TYPE OF
INSPECTION
REQUIRED
E Re,nforced Concrete
E Preslresssd Concr€te
E Rsanforced Masonry
E Stucturalsl€€l
f] Fir€ Proo,lnq
E Shotcrele
E Oualily Control
trI oue, B-l 107
odob"W.'ffi.u..cnv
Santa Ana
Voluntary S6ismic Strenghthening '"i0\bbz+q 'S'a"ff8nna
\ffi ",j3*,,*"^i,lHp
HlE[Sk%iT'3i'? SiiBrq'ade
solrce erc )'Sliiflur
"FIlfrler oesign
liiiSli:i8ld![oush Ii n
TESTS PERFORMED
TYPE OF SAMPLE SLUMP AOOITIONAL REMARKS ON SAMPLES
INSPECTION SUMitARY. LocATIoNS oF woRK INSPECTE0, TEST SAMPLES TAKEN WoRK REJECTED JoB PRoBLEMS, PRoGRESS. REMARKS
ETC, INCLUDE INFORMATION AEOUT AMOUNTS OF MATERIAL PLACEO OR WORK PERFORMED. NUMBER & ryPE OF
TEST SAMPLES TAKEN STRUCTURAL CONNECTIONS (WELDS MADE BOTTSTOROUED) CHECKEO. ETC,
I arrived at 0730 and met with James. I observed them tightening the cables to the specs called out on the approved
plans. All work inspectad today is consistant with approved plans and specs. Today they flnished the area A-C X28-42
The only area left to inspect at a later date is 2842 P-R
OUALITY CONTROL
CHECKLIST
tr cHEckED'{wrHcry tr(
trl
tr(REVIEWED PREVIOI,IS REPORTS
tr EsrE*oRwoERsPEcs
E comEcrrcGsAwEs
tr SAMPLESSIOREDSAFELY
tr carED,Ns^MPLEsFoRPaxlP
tr aLcF,cHd€sNorEDM
til tr orFER
corrrueo on rexr eace f]CERTIFICATIOI{ OF COMPLIANCE
ALL WORK LISTEDABOVE WAS INSPECTEOAS REQUIRED AY
THE APPROVED PLAN, SPECIFICATIONS. AND GOVERNING COOE
WORK COMPL]ESI!IT11 f:j woRK DoEs Nor coMPLY
B-l 5322075 ICC
TIME IN TIIVE OUT nec. nound o.T. HouRS SAMPLES
0730 0900 a zl--
All nsoeclio.s based on 6 mrn muh ol 4
the '.soeclo. 's
@lled Io a
.h6(6 will b6 6pdied Ploase
Jacob Kulik
NO
www.kouryengineering.com FORM FR-20003 03/1/2015
tr
flr.ouANnTY rN sEi ]
I
CCr Arhitecl. Enoneer, Buildnq Otrci6l
KOURY ENGINEERING
14280 EUCLID AVENUE
cHrNo, cA s1710
(24 Hour) Cell: (310) 7'13-4005
Office: (909) 606-6111
Fax: (909) 606-6555
ENGINEERING
& TESTING, INC.
REGISTERED INSPECTOR'S DAILY REPORT
o"'" 19-06-10 Mon
"''*n" 19-oss4
TYPE OF
INSPECTION
REQUIRED
E Reinforced concrcte
fl Presksssed concr€ts
[] Reinforced Masonrv
E Strucruralsiesl
E Firc Proolnq
E shorcrere
E Ouallv Control
L:
U other B-l 107
E8-b"$f.oW'"rn".. nu".Citv
Santa Ana
Voluntary Seismic Strenghthening "''f0'lbbz++'Sbilitodan"
ttt-ijB'**"^'Ml\p
Ite6lrDes.iDdon
{ry're a,ade solrce etc.)u's{iif:"r
"T'iS"liiler oesign croup
wiisFiHSl0rtougnrin
s,spge'or
TESTS PERFORMEO
TYPE OF SAMPLE SLUMP QUANTITY IN SET AODITIONAL REMARKS ON SAMPLES
Arrived and met wilh James. We went up on the lift and lwatched while they tightend the cables to lhe required
are set to 5 KIPS
OUALITY CONTROL
CHECKLIST
tr
Ei
E
trr
M
tr Esr4RFoRMEoPERsPEcs
E comEcrNossAr{Es
D SAMFTESSTOREOSFELY
tr cALL€oiNsalPlEsFoRAck@
tr NLoEFa'ENc'EsNoreo
dRry@mPiEvo,,sREPoRrs E dER
CONTINUED ON NEXT PAGECERTIFICATION OF COMPLIANCE
AL! WORX LISTEOAAOVE WAS INSPECTEOAS REOUIRED BY
THE APPROVEO PLAN, SPECIFICATIONS,AND GOVERNING CODE
woRK coMPLtES wlTH E WORK OOES NOI COMPLY
5322075 ICCB-l
SAI\,IPLESTII\,,IE IN TIME OUI/O,I HOURS
0830 1$9[4
J K
r lll
E!
CC ,rch tecl Enqine. Buildina official
NO
www.kouryeng neering.com FORM FR-20003 03/1/2015
INSPECTION SUMMARY. LocATIoNs oF WoRX INSPECTEo, TEST SAMPLES TAKEN WORK REJECTEO. JOB PROBLEI\,4S, PROGRESS, REI\,4ARKS.
ETC, INCLUDE INFORI\,4ATION ABOUTAMOUNTS OF MATERIAL PLACED OR WORK PERFORMED. NUMBER & TYPE OF
TEST SAMPLES TAKEN STRUCTURAL CONNECTIONS IWELDS MAOE, BOLTS TOROUED) CHECKED, ETC.
specs. The area finished today is P-R 28-42. The single harps are at 6 KIPS and the double harps
Tl
N'HI
JOB MEMORANDUM
Date: June 14,2019
Project Name: 500 West Wamer Ave., Santa Ana, CA 92707
Building permit number: 10199744
From: James Kramer Of: N,IHP
To; Jakob Kulik Of: Premier Design + Build Group
cc: JeffHall Ot: SPS
Ph:562.985.3200
Ph:949.333.2261
Ph: -
Email:
Email;
Email:
Projecl Number: 17-0285-01
Page 1 of '1
jkramer@mhpse.com
jacob.kulik@pdbgroup.com
jhall@spsconslruction.com
Subject: STRUCTURAL OBSERVATION
A structural observation was performed for the above job on the morning of Wednesday June
10, 2019 by James Kramer, SE of our office. Structurally observed was; seismic wall
anchorage and roof framing strengthening for the north third of the project (grids 28 to 42, Alo
R).
With the exception of the items noted below, all observed construction appeared to be in
general conformance with the construction documents.
At the time of the observation, 100% of the wall anchorage and 100% of roof strengthening in
the area reviewed had been completed.
On-Site General Contractor - Jakob Kulik, Premier Design and Build Group
On-Site Sub-Contractor - Jeff Hall, SPS
Specific ltems Noted and discussed on-site -
- None