SUPERVISED COMPACTION REPORT
PROPOSED INDUSTRIAL BUILDING I9
3O3O SOUTH SUSAN ST.
SANTA ANA, CA
I
CONDUCTED FOR:
J.A. STEWART
7150 FENWICK LANE
SUITE 2OO
t^lESTMINSTER, CA 92683
A
ACTION
ENGINEERING
CONSULTANTS
Classificat'i on
Fine-Sand-Silty
Coarse-Sand-Si I ty
12t3)
(714)
598-8579
821-3150
T/y'- lf t - 24 2/
SOILS ENGINEERING AND GEOLOGY
t0621 Bloomfield Avsnue Suite 23 Lor Alamitos California 90720
July 31 , l97B t^l.0. 1 63801
J.A. Stewart
7150 Fenwick LaneSuite 200
Westminster, CA 92683
Subject:ction Report- Proposeding l9- 3030 South Susan
a , cA
Dear Sir:
Forwarded herewith is the Compaction Report on the above
referenced project. The reuslts of the compaction tests are
shown on Table I. The locations of the tests are shown on the
accompanyi ng pl of pI an
Laboratory Standard: (ASTM: D-l 557-70)4 inch dia. mold; 1/30 cu.ft.vol.;5 layers - 25 blows per layer;
10 lb. hammer dropped l8 inches
Supervi sedIndustrialStreet- San
Compa
Bui I dta An
Soi I
Type
0ptimum Max. Dry DensityMoisture % Lbs./Cu.Ft.
III I
I
0
0
0
2
.I.I3.0
I 25.0
The grading operation was conducted f rom Ju'ly 6, 1978
through July .I4,.l978. Supervision was provided during this
period utilizing the reoort issued by Evans, Goffman & McCormick,
dated April 6, .l978, Job No. 7B-37.
[^l.0. l63B0l
Prior to the placement of fill soils, a'l 1 vegetation and
debris was removed from the site. In the slab area, the exsisting
I oose so ils were processed to a depth of 2 feet. In the area
of the perimeter wal I f ooti ng and i ntert*0. co'l umn f ooti ngs, 5. 5
feet of exsi sti ng soi I was removed. The expored surface was sca-
ri fi ed, moi sture condi ti oned and recompacted to go% of Laboratory
Standards.
Fill soils were then p'laced in 6 inch lifts, moisture con-
ditionsd and compacted in a like manner.
The native soil classifies as a SAND, silty and is suitable
for the support of the fill and the proposed structures.
compacti on was obtai ned by track and wheel ro'l I i n g. A
water truck was used for moi sture control.
The relative compaction percent was determined by the Sand
Cone Method (ASTM: D-l 556-70) and the Nuclear Method (Test Method
No. Calif. 23lF). These tests were taken a minimum of every 500
cubic yards placed and every 2.0 feet in depth of fill placed.
Maximum depth of fi1l placed inc't uding the rework depths
was 5. 5 feet.
water sol ubl e sul fate tests were performed on typi cal sam-
p'l es of the si te materi al . The resul ts of the test conducted are
presented below. Type 5 cement is not necessary for the founda-
Page 2
JA
t^l.0. l6380l
tions and slabs on the
Test D-5.l6.
SamPl e Locati on
referenced project as determined by ASTM
Soluble Sulfate, %
N Central Pad 0.036Center 0.044S Central Pad 0.041
The potential expansion of the soil was dete
dance with Section 29 of the U.B.C. 1913 edition.
as follows:
Soi I Expansion
Type I ndex
Very Low
er square foot
,u{ be used f or perimeterwal'l and i nteri or col umn f ooti ngs a
minimum width of two (2) feet founded l8 inches below lowest ad-
iacent fina'l grade. This value is for combined dead and frequ-
ently app'l ied live loads and may be increased by l/Z for the
total of all loads including seismic and wind loads.
Due to the very low potential expansion of the soils, the
usual requirements for ex pansive conditions are not deemed nec-
essary. However, it is recommended that the following steps
may be taken to minimize the effects of moisture infiltration
into the s'lab and footing supporting soils.
l. The surrounding areas should be graded so as to ensure drain-
age away from'the building.
Page 3
rmined in accoF-
Resul ts are
Potential
Expansion
I5
A recommended bearing value of 3000 pounds p
IA
1.1.0. l63g0l
2- Concrete fl oor sl abs i n areas to be covered wi th moi sture
t',it'titive coverings shall be constructed over a 6 miI plas-
ti c membrane. The pl asti c membrane shoul d be properl y I apped,
seal ed and protected wi th sand.
I hereby certify that the subject grading was supervised by
me and the work was done in full compliance with the Grading
Ordinance of the city of santa Ana, cA and in accordance with
best accepted practi ces and the appl i cabl e chapter of the u.B. c. .
Thi s certi fi cati on covers aI I certi fied gradi ng work at
the above I i sted si te and methods of pl acing, stab.i l izing and
compacti ng f i'l I .
we appreciate this opportunity to be of service to you.
Respectful ly submi tted :
ACTION ENGINEERING CONSULTANTSfua
BRUCE A. PACKARD RCE I3BOI
CC:Cadi I I ac Fairvi ew/Cal iforni a Inc.
300.I South Harbor Blvd.Santa Ana, CA gZ7O4
Page 4
A
zn^
TIJ \J F
, I lJ-ll- Vr r< svI Ed 7l+Jp 20-
\J-U
c..I(t-
(}-s\or f..
(|-
I
I
cn
(r-cf)rN\r \s
1}-
Ns >r \\
f
,\r
I
I
I>l Nqtr
I
I
I
-)
lr Io;v)F [-t IJ H llH H tl l-l A H l_l -l H 6
I
FI
i
F
:EO:E l':
FU2'-\.ta
-t co
d.o
o
rt
9
@
a
\9
3
t
-)
-It
..9
--
I
\0
:r
:
T!
t,)
?J
9
nsI --
\r)
=
a-
a
o
-,
r-
oT
--
N.l
[l--
N
T--.
a
ci
:
r!-
_,.r/ayn tr-r
\./ a< Ll-2\r
q
!
ln
o
ta
o
\4
9
q
(r
to
c,
o
N
o
o
q
f
q
O-
lo
(r'\
\S\
to
0\.
FVI
tr I
FA F
=r!uI
!. -'
Po
ttJD
ato
I
t.)
\
o
)
I
tr)
r)
aj
I
\n
r)
l,)
i
t
9\
o
I
ln
o
r.?
I
In
N
o.
a
I
t6
N
q
c?
I
t,)
\i
q
rq
I
l4
r.i
q
a
t
h
(
o
a\\
I
lo
0
ff,
t
tn
N
In
I
o
f)
I
C
\t)
I
0
\
zo
F
Uc
:q{
C\
l.-
s
A
\J
l$
r)
-,\-
t
=
-
O
-
5
-
FJ
?
!P
=
cZ
F
tt1
tJ.lF
I
-..l h.lal a-l \Nn)
a\
\
a
\.,
:
aa
I\
a sa
IN\-l \\\\
N\\
tn\\
>.
\
r)
\
\
r'J
x.
F
F6Z
u.Jo
o
trl
T!
;Ja
*
(9?,z2ESl-rJ t:
2 trJ Joz)
--V)F9Zozo
a\
of-
(s
to
\
il
ci
1
.4@
=L(
I
I
C
q
a
=
I
I
II
I
T:r
t!F
F
;6z
t!o
o
eg,z2G,s
l-lJ I:z ur iozt_v,l-92(Jzo
;J
COf
tJ.J .q7
/ tJ.JEY/1 u.J
=3
a
li.
a
fl.s\-
\t
C;
a
7
z
lJ-r v F
r rllJt- Vr r
r
-LlJu 20-
\J-U
(r
u T\
$
o
\r
-) trtc;tt) F H H l..
FIu:
tJ.J r r\b3:)
FU7'-\a Ltl-) co
d,vo
.9
a
N\.\
Io
a\\
tYr/
$.
a\
h
)\
o
l,)\
o
to
\
I
I
Frf)
LJrlF.-.FHfr
t!
I
\'7
Po
\uD
,?
I
o
l6
I
o
D
I
o
\
z
\./tr
Uc
7
a
J
(L
l-
o)
o
rtj
Ur
VI
e
aa
ta
a
oZ
F
r.n
t.J
F
J
=
r---
-
e0
^J^14E
I
I
S,l. Se t a
Ir
.-
iccflTl,]t 0r c0iltPrcTt0]t TrsTs
X = COMPACTION TEST
PREPARED TOR
ACTION
ENGINEERING
CONSULTANTS
ORX ORDER:
I 59Zo t
xlo
x ,ol
t<t,g
X loL
x ll7
xu0
x to3
x ilt
Bldg, P3 Iq
F,P= gg.5 xlog
X to6
xlt
x n3
x tig
x n6
x t1+
XIIS
x t01
C A Di LLAI raievlE*/ c*uii TNe,.,A
7tr
..=
ll
IA
TE: