Loading...
HomeMy WebLinkAbout3030 S Susan St - Soils Reportht' RECE,YED AU ti.r srrren I coigTg,976. ce fr * ,1, A, ,;I:il SUPERVISED COMPACTION REPORT PROPOSED INDUSTRIAL BUILDING I9 3O3O SOUTH SUSAN ST. SANTA ANA, CA I CONDUCTED FOR: J.A. STEWART 7150 FENWICK LANE SUITE 2OO t^lESTMINSTER, CA 92683 A ACTION ENGINEERING CONSULTANTS Classificat'i on Fine-Sand-Silty Coarse-Sand-Si I ty 12t3) (714) 598-8579 821-3150 T/y'- lf t - 24 2/ SOILS ENGINEERING AND GEOLOGY t0621 Bloomfield Avsnue Suite 23 Lor Alamitos California 90720 July 31 , l97B t^l.0. 1 63801 J.A. Stewart 7150 Fenwick LaneSuite 200 Westminster, CA 92683 Subject:ction Report- Proposeding l9- 3030 South Susan a , cA Dear Sir: Forwarded herewith is the Compaction Report on the above referenced project. The reuslts of the compaction tests are shown on Table I. The locations of the tests are shown on the accompanyi ng pl of pI an Laboratory Standard: (ASTM: D-l 557-70)4 inch dia. mold; 1/30 cu.ft.vol.;5 layers - 25 blows per layer; 10 lb. hammer dropped l8 inches Supervi sedIndustrialStreet- San Compa Bui I dta An Soi I Type 0ptimum Max. Dry DensityMoisture % Lbs./Cu.Ft. III I I 0 0 0 2 .I.I3.0 I 25.0 The grading operation was conducted f rom Ju'ly 6, 1978 through July .I4,.l978. Supervision was provided during this period utilizing the reoort issued by Evans, Goffman & McCormick, dated April 6, .l978, Job No. 7B-37. [^l.0. l63B0l Prior to the placement of fill soils, a'l 1 vegetation and debris was removed from the site. In the slab area, the exsisting I oose so ils were processed to a depth of 2 feet. In the area of the perimeter wal I f ooti ng and i ntert*0. co'l umn f ooti ngs, 5. 5 feet of exsi sti ng soi I was removed. The expored surface was sca- ri fi ed, moi sture condi ti oned and recompacted to go% of Laboratory Standards. Fill soils were then p'laced in 6 inch lifts, moisture con- ditionsd and compacted in a like manner. The native soil classifies as a SAND, silty and is suitable for the support of the fill and the proposed structures. compacti on was obtai ned by track and wheel ro'l I i n g. A water truck was used for moi sture control. The relative compaction percent was determined by the Sand Cone Method (ASTM: D-l 556-70) and the Nuclear Method (Test Method No. Calif. 23lF). These tests were taken a minimum of every 500 cubic yards placed and every 2.0 feet in depth of fill placed. Maximum depth of fi1l placed inc't uding the rework depths was 5. 5 feet. water sol ubl e sul fate tests were performed on typi cal sam- p'l es of the si te materi al . The resul ts of the test conducted are presented below. Type 5 cement is not necessary for the founda- Page 2 JA t^l.0. l6380l tions and slabs on the Test D-5.l6. SamPl e Locati on referenced project as determined by ASTM Soluble Sulfate, % N Central Pad 0.036Center 0.044S Central Pad 0.041 The potential expansion of the soil was dete dance with Section 29 of the U.B.C. 1913 edition. as follows: Soi I Expansion Type I ndex Very Low er square foot ,u{ be used f or perimeterwal'l and i nteri or col umn f ooti ngs a minimum width of two (2) feet founded l8 inches below lowest ad- iacent fina'l grade. This value is for combined dead and frequ- ently app'l ied live loads and may be increased by l/Z for the total of all loads including seismic and wind loads. Due to the very low potential expansion of the soils, the usual requirements for ex pansive conditions are not deemed nec- essary. However, it is recommended that the following steps may be taken to minimize the effects of moisture infiltration into the s'lab and footing supporting soils. l. The surrounding areas should be graded so as to ensure drain- age away from'the building. Page 3 rmined in accoF- Resul ts are Potential Expansion I5 A recommended bearing value of 3000 pounds p IA 1.1.0. l63g0l 2- Concrete fl oor sl abs i n areas to be covered wi th moi sture t',it'titive coverings shall be constructed over a 6 miI plas- ti c membrane. The pl asti c membrane shoul d be properl y I apped, seal ed and protected wi th sand. I hereby certify that the subject grading was supervised by me and the work was done in full compliance with the Grading Ordinance of the city of santa Ana, cA and in accordance with best accepted practi ces and the appl i cabl e chapter of the u.B. c. . Thi s certi fi cati on covers aI I certi fied gradi ng work at the above I i sted si te and methods of pl acing, stab.i l izing and compacti ng f i'l I . we appreciate this opportunity to be of service to you. Respectful ly submi tted : ACTION ENGINEERING CONSULTANTSfua BRUCE A. PACKARD RCE I3BOI CC:Cadi I I ac Fairvi ew/Cal iforni a Inc. 300.I South Harbor Blvd.Santa Ana, CA gZ7O4 Page 4 A zn^ TIJ \J F , I lJ-ll- Vr r< svI Ed 7l+Jp 20- \J-U c..I(t- (}-s\or f.. (|- I I cn (r-cf)rN\r \s 1}- Ns >r \\ f ,\r I I I>l Nqtr I I I -) lr Io;v)F [-t IJ H llH H tl l-l A H l_l -l H 6 I FI i F :EO:E l': FU2'-\.ta -t co d.o o rt 9 @ a \9 3 t -) -It ..9 -- I \0 :r : T! t,) ?J 9 nsI -- \r) = a- a o -, r- oT -- N.l [l-- N T--. a ci : r!- _,.r/ayn tr-r \./ a< Ll-2\r q ! ln o ta o \4 9 q (r to c, o N o o q f q O- lo (r'\ \S\ to 0\. FVI tr I FA F =r!uI !. -' Po ttJD ato I t.) \ o ) I tr) r) aj I \n r) l,) i t 9\ o I ln o r.? I In N o. a I t6 N q c? I t,) \i q rq I l4 r.i q a t h ( o a\\ I lo 0 ff, t tn N In I o f) I C \t) I 0 \ zo F Uc :q{ C\ l.- s A \J l$ r) -,\- t = - O - 5 - FJ ? !P = cZ F tt1 tJ.lF I -..l h.lal a-l \Nn) a\ \ a \., : aa I\ a sa IN\-l \\\\ N\\ tn\\ >. \ r) \ \ r'J x. F F6Z u.Jo o trl T! ;Ja * (9?,z2ESl-rJ t: 2 trJ Joz) --V)F9Zozo a\ of- (s to \ il ci 1 .4@ =L( I I C q a = I I II I T:r t!F F ;6z t!o o eg,z2G,s l-lJ I:z ur iozt_v,l-92(Jzo ;J COf tJ.J .q7 / tJ.JEY/1 u.J =3 a li. a fl.s\- \t C; a 7 z lJ-r v F r rllJt- Vr r r -LlJu 20- \J-U (r u T\ $ o \r -) trtc;tt) F H H l.. FIu: tJ.J r r\b3:) FU7'-\a Ltl-) co d,vo .9 a N\.\ Io a\\ tYr/ $. a\ h )\ o l,)\ o to \ I I Frf) LJrlF.-.FHfr t! I \'7 Po \uD ,? I o l6 I o D I o \ z \./tr Uc 7 a J (L l- o) o rtj Ur VI e aa ta a oZ F r.n t.J F J = r--- - e0 ^J^14E I I S,l. Se t a Ir .- iccflTl,]t 0r c0iltPrcTt0]t TrsTs X = COMPACTION TEST PREPARED TOR ACTION ENGINEERING CONSULTANTS ORX ORDER: I 59Zo t xlo x ,ol t<t,g X loL x ll7 xu0 x to3 x ilt Bldg, P3 Iq F,P= gg.5 xlog X to6 xlt x n3 x tig x n6 x t1+ XIIS x t01 C A Di LLAI raievlE*/ c*uii TNe,.,A 7tr ..= ll IA TE: