HomeMy WebLinkAbout3220 S Fairview St - Soils ReportI
I
t
T
I
T
T
T
I
t
I
I
T
I
t
I
I
t
I
WAXIE'S
?tatl c1"# 7??z
KENNETH C, L)SBORNE & ASSOCI.\TES
p.r(nu eoi4
*fr/u-rru e
s,Ju,'{r'=< a*4" ?luu
c,/.r "-s o-4; o.a
? \-J E, .'/
it
r thc a
'/("e
i.-t e s>c-t -l
SEPARATT PTRMIIS AT
-G 4*
iltii6 i
lulicatr
'r lawlL
tI
ff
{
\)
o
h
xq
-.;'tr
G
ETEGTRICAT-
This set ol plans a
at all times and
atteratrons on sar
City of Santa Ana
The acceplance of ths plan and specrl
be held to permit nor be an approval o
provrsrons of ANY Oty 0rdtnance or S
,t01
anl
&;
g22O SO. FAIRVIEW ST.
SANTA ANA, CA. 927Q11
bt
G R,L':i ,
ACCEPIID FOR CCIi';.,lJCTIOI
CITY OF SANT
$"'
By Date
KENNETH G. OSBORNE & ASSOCIATES
vul
GEOTECHNICAL REPORT OF ROUGH GRADING
Kleenllne Industrial Bu 11d ln g
3220 S. Fairview S Ereet
Santa Ana, CaLlf ornla
C11ent:Lagerlof ConstrucElon Co.
1607-L E
Santa Ana
AttenEion:
.E,c
Mr.
dingerL 92705
Lagerlof
Job No. 487 L
January 28, 19 88
Qlcl'fru
GEOTECHNICAL ENGINEEBING 17141 MURPHY AVENUE IRVINE, CALIFORN IA 92714 \714) 474-2001
I
I
I
I
t,
I
PaRe
TNTR0DUCTTOII---j------ I
FIELD TESTING AI{D OBSERVATIOI{S---------- 1
LABORATORY TESTING---- 2
RE}IARKS AND RECOMUENDATIONS
Footlngs and BearLng 2
Concrete SLsb Construction----- 2
Expansloa-- 3
Soluble Sulfates--- 3
LiElEs of ReportinS---------- 3
General---- 3
APPENDIX
Table of Test Results---------- A-B
Teat Locatlons-------- C
t
I
I
t
t
I
I
TABLE OE CONTENTS
Job !{o. 4871 Page 1
INTRODUCTION
This report presents the results of testlng and
observatloos nade by thls flrm durlng the rough gradlngperformed on the property locaEed at 3220 S. Falrvlerc Street
1n the clEy of Santa Ana, Callfornia.
Refereoce should be rnade to the GeotechnlcalInvestiSa!10n as prepared by thls firm on ovember 53 1987.Please also refer to our Gradlng Plan Review letEer dated
January 2L// 1988.
FIELD TESTING AND OBSERVATIONS
As preparatlon
performed:
the
clearlng operaElon,vegetation,
removed from thewere
for
1. The existlng ground in the areas of the building,extending a nininuo of 5 feet outside the bulldlng line, wasundercut to a depth of 3 feet below the boEton of thefootlngs. The exposed surface was then scarifled and
compacted to a depth of 6 to 12 Lnches.
2. The existing ground ln the Lruck well areaundercut to a depth of 3 feet below the bottom offootlngs and then scarified and compacEed to a depth of
12 inches.
1{AS
the
6 to
3. The exlsEing ground ln Ehe driveway and parklng areas
were scarLfled and compacted to a depth of 10 to 12 inches.
4. Benches were constructed into the previously placed
fill during the undercut operating and as the new fl11 wasplaced.
5. A sof! and ueE areatruck nel1 area at the
yas encountered in the
conpletlon of grading.
bot.tom of
Thls area
I
Planned for construcEion is a single two-story
office/narehouse bullding nhich will be of concrete tilt-up
type. The strucEure 1s to be supported on conventlonalcontlnuous and pad footings with slab-on-grade concrete
f 1oors.
As part of thebulldings, and debris
all
site.
recelving fi11, the followlng was
I
t
I
I
ll
Job l{o. 487 L Page 2
vl11 need lnspectlon and possible stablllzatlon at a later
date.
The fill vas placed Ln 4 lnch llfts and conpacEed byneans of a 5fx5r eheepsfoot roller 6ttached to a D-6bulldozer and by means of whee1ro111ng wlth loaded scrapersand a rrater truck. The required moisture was supplied by a
3500 gallon YaEer truck.
The fl11 materlal conslsted of both on-site and imported
soi1s. The on-slt.e maEerial consisted of si1ts, sandy Bi1t.s,sl1ty sands, and sands, whl1e the lmport. consisted of sl1ty
sand ob!ained from Ehree sources.
TesEs
compacted
10 _)
for
soil rrere
UBC
volume change wiEh noisEureln accordance uith the
performed on
TesE S ta ndar d
The maxlmum denslty of
accordance vlth A.S.T.M. Test
the soil was
Method D-l557.
value of
of theloading.
deEermlned tn
?825 pounds per square
above bearing value is
The concentratlon of soluble sulfaEes in the soLl nasdeEernlned by A.S.T.l'{. Test. MeEhod D-516 Method A and 1s
expressed as a percentage by telght of dry soI1 tested.
REMARKS AND RECOMMENDATIONS
Footings and Bear ing
be 1o rc the lowe acen . This value nay be
lncreased pounds er
foot. ln v d rh to a max
Footings may be deslgned for an allowabIe bearing valueof 1925 ,ounds per square fooE provided they are placed to amlnlmum r.r'l drh af I 2 i nchec and a mlnJ mum deDth of I8 i nches .
num
oo rease opernissible for ghorE duration
Concret.e Slab ConstrucEion
reconnended that concrete floor slabswith noleture sensltive coverings be
f. t/3
Ir is
be covered
in areas to
construcEed
The denslty of the soils vas determined ln accordancewith A.S.T.M. Test lleEhods D-l556 and D-2937. The Eestresults uere conpared to the naxinun density as deterElnedin accordance nlLh A.S.T.M. Test Method D-1557. The resultsof the Eests are presenEed on the atEached "Table of Test
Result.srr nith their approximate locations shown on the
attached ploE plan.
LABORATORY TESTING
I
I
I
I
Job No. 48 71
over a 6 nl1 plastic nenbrane. The plastic menbrane should
be properly lapped, sealed, and proEected uit.h sand .
IE ls cauEioned that concrete slabs ln areas to recelve
ceramlc tlle or other crack sensitive floor coverlngs nust
be deslgned and consEructed Eo Einlmlze hairline cracklng.
Expanslon
The results of tests indicate that the solls existlng
the site possess Low expanslon potential. The results are
f o11ows:
on
as
Source
Location
Maximum
Densi.ty
0ptinun
MoisEure
Expanslon
Index
Huntington Beach l2l .5
Oso Parkvay
Mission Vie jo
12.2
consEruction
t4
As a result,
necessary for expans
os
ve soll purposes on this
Limlts of Re ortin
Thls report covers the gradlng
lndustrial buildtng betveen Ehe dates
!hrough January 25, 1988.
perforned f orof January 7,
the
1988
General
The grading performed on thls aite uas done ln anacceptable Eanner and in confornance wLEh the GeotechnlcalInvestlgatlon. The results of testing lndicaEe EhaE the fillhas been compacted to at least 90 percent of maximundenslty. Based on test results and observations made by thisflrn, 1t ls the oplnlon of thls englneer Ehat this proJect
is suiEable for the constructlotr of the Kleenline fndustrial
Bul1dlng.
Page 3
Soluble Sulf ares
The soils exlstlng on the sLte contaln a soluble sulfatecontent less than O.2O percent whlch 1s not considereddetrlmental to ,standard concreEe 01xes. As a result, no
s&ec1al, ce-EearY type or consLruction 1s consldered necessal!for soluble sulfates for this project.
neg.
is consldered
pro ject.
I
I
I
I
Page 4
This report is issued ylth the understandln8 thaE it ls
the responsiblllty of the ovtrer or hls representaELve to
lnsure that Ehe lnforoation and reconoendatlons contalned
hereln are ca11ed to the attentlon of the ProJect Architect
and Eogineer and are Lncorporated lnEo the plans and
speclfications and that necessary steps are taken to aee
EhaE the ConEractors and SubcontracEors carry out such
recomnendations.
Resp bmitted,
KEN NE & ASSOCIATES
Ke
G. 0
11v
I
I
I
Job No. 487 L
VGMcF: dhd G.
I
I
I
I
APPEND I X
I
t
KENNEfH G OSDORNE (' ASSOCIATES
TABLE OF TEST RESULTS
RMKS,
ftestretest
ItEest
re ES
487 I - Laserlof L ocat io n Santa Ana
EL EVATIONS MAX,
DENS
%FIELO
OENS.TEST NAT FG,
TE ST
NO
u.lc
F
TEST
.OAIE^
108.5 9198.9 t9.232.O 37 .O 38.5 15 .31Tr/8
108.5 91t4.6 98 .4 t9 .232.O 37.0 38. s2Tr/8
108.5 93100.8 t9 .232.O 37.0 38.5 20.r3Tr/8
108.5 92t9 .7 100.1 'to ,32.O 37.0 38.5Tr/8
108.5 9216 .9 100. 2 L9 .25TL/77 34.O 37.0 38.5
111.2 9416.9 105.2 17.66TI/IL 34.0 37.0 38.5
Ltt.2 8813.3 98.4 17.67Tr/Lt 33. 5 37.0 38.5
108.5 93101.0 79.28T| / rt 34 .0 37.0 38.5 18.3
tlt.2 93r03.6 17 .69TL/tt 33.5 37 .O 38.5 20 .1
111.2 9319 -4 103.7 L7.610T1/7r 34.O 37.0 38.5
r7 .6 9337.0 38.5 19.0 103.5TI/IT
17.6 111.2 9336. s 37 .O 38.5 20.8 103.3t2Tr/rr
93100.8 79.2 i08.si3Tr/tr 36.5 37.0 38.5 19.0
9377 .6 111.274T| /rr 36.5 37.0 38.5 18.0 103.8
93102.9 t7.6 111.215T1/ rr 37.0 37 .O 38.5 20. I
111.2 92102.0 t7 .6t6Tr/Lr 36.0 37.0 38.5 t9 .7
111 .2 9636.7 38.5 17.6 106.8 77.6t7Tr/12 34. s
17.6 111.2 9418Tr/t2 34.5 36.7 38. s r4.9 105.6
ttl .2 9337.0 38.5 20 .1 103.6 t7 .619Tr/t2 36 .0
17 .6 111.2 9320T7/12 36.0 37.0 38.5 18.7 103.2
9016.9 100.2 t7 .6 111.22lTr/t2 37 .0 37 .O 38. 5
ttt.2 9237 - 0 37.0 38.5 t9 .4 102.8 t7.6Tr/t2
t7 -6 111.2 95)a T 1/1?17 .O 37.O 38.5 16 .6 106.1
9336.0 38.5 2t .2 102.9 77 .6 lll.2Lt+T | /12 34.0
9334.0 37 .0 38. 5 t9.4 103 .9 t7 .6 111.225Tr/12
11 '.)L2t .5 9126Tt/L3 36 .0 36.5 38. 5 t4.9 109.9
112 .8 12.2 121.5 9377Tr/13 36 .0 36.5 38. s t4.3
113.3 1.' .'121.5 9328Tr/t3 3s.0 36.5 38.5 14.6
94T35.0 36.5 38.5 13 .0 113.9 t2.2 121.529t/t3
113.5 t2.2 121.5 93ioT7 / 73 Jb - )36.0 38.5 13.3
37 - 0 36. s 38.5 12 .4 113.8 t2.2 t21 .5 9431It/13
111lL i7 - 5 i6 - 5 38 - 5 13-5 I13.0 12.2 121.s 93a2T
T t/r4 37 .5 36.5 38. s 14.0 111.8 12 .2 t2r.533
Test Type Code: S = Sand Cone. T = Drive Tube
Technician - f,ar1 Zimnernan
Page A
Job No. - Client
OPT
MOIST
FIELD
MOIST,
111.21136.5
o?
I
KENNEIH G. OSDORNE C' ASSOCIATES
TABLE OF TEST RESULTS
RMKS.
Job No. ' Client 487 L - Lagerlof Santa Ana
Karl Zinmeroan
ELEVATIONS MAX,
DENS
FIELD
DENS,
OPT,
MOISTF,G
FIELD
MOIST
TE ST
NO
o-TEST
DATE TEST NAT
121 .5 93113.0 t2.236.5 38.5 11 .734T
tvdtr/r4
tzl.5 o?111.8 t2.236.5 38. 5 t2.735Tr/r4 35.5
tzL.3 93t2.238.5 11.736L/L5 35.5
t2t.5 93rtz.6 12.238.5 13.337Tr/rs 35.5
111.2 93103.633.5 37 .0 34. 5 16.3JOTr/rs
92t7 .616.9 101.6TL/L5 33.5 37 .O 34.5
110.5 92to2.2 16.538.5 38. 5 15.940Sr/2s
110.5 94103.9 16.s4138.5 38. 5 13. 6Sr/2s
111.219.7 100.0 t7 .642Sr/2s 34.5 34.5
II
III IIIIII
I IIII
Test Type Code: S = Sand Cone, T = Drive Tube
Tech nician
Abdul lah MisklnYar Page B
%
MAX,
36.5
36.0 112.5T
36.0
t7 .6
111.239
90F
I
=
=
I
--l
E-l-
l
---t
tl
--t
=
Location
T
T
T
t
I
t
I
I
T
I
I
I
I
I
t
t
T
T
T
TEST LOCATIONS
JOA NO,
4U7/
DATE..ze.t8 ,l...o.ol4b---
./S.C E /a31O
t4t
37
t?
5
"Db 2+
Uo
40
a
7+,
l?.
olb
./o
'2 .2,
Co cZ9
2+
a9'zz
o18
.r2
t.5 ?@ zo
g22O 5. t4r.Q ?/Ael/
(
€a.7 /
t
t
N
\
N
t
tI)
\.
$
\J
\
h
\
4Pa
7?&< WA4-
\
N\
\
98-
1a42P4@
4,?42r./-UG
.?RA.4.5€2
.r-,P?czz,4€-
.,/ - .2€..,/5/r'f 7-€SZ-
.3€a?e!1€ -7,,?P Ar
tU.,<. .?, P.y15 / 4e.
Nz_
-Sc.]z€: ..'/-,/4)/
Page C
KENNETE G. OSBORNE & ASSOCIATES
o
I
I
I
I
I
a./.?2/./5 aF
l
I
az9
t,
)r5'1) o
I
KENNETH G. OSBORNE & ASSOCIATES
January 2l, l9AA
lrl. R. Haynes & Co.
3829 Birch Street
Newport Eeach, Cal i+ornia 92660
Attentron: l'1r. Bob Steaffens
Subject:Eradrng PIan Review
32205 S. Fairview Street
Senta Ana, CaIi{ornia
Reference: I Gradrng P 1an, Industrial Building
3220 S. Fairview Street
by w. R. Haynes & Co.
December 14, 1987
2. Geotec nical InvPSti qation
Kleenlrne Building
Farrviela & Al ton
Santa Ana, Cali+ornia
by Kenneth G. Os borne
November 5, 1987
&AEEoc i a tes
Gentlemen:
As requested, a revier", has been made o+ the re+erenced
grading pIan. Thrs rev-iew has been +or geotechnical purposes
only and no opinron is expressed concerning any other aspecto+ this plan.
In the re+erenced geotechn.ical report, rec ornmenda ti on s
r{ere given 4ar paving with asphaltic concrete. The grading
plan calls for the paving on this project now to be 6 inches
o{ Portland cement concrete. It must be noted that this
pavemernt design did not come +rom this o+rice and as such,
no opinion is o++ered as to its adequacy.
Job No. 4871 Paqe 1
GEOTECHNICAL ENGINEEBING 17141 MUBPHY AVENUE IRVINE, CALIFORNIA 9271'
,4/t-
0
I r
s
I
Q11) 171.m01
IAi
KENNETH G. OSBORNE & ASSOCIATES
R. Haynes & Co.January 2l, l9BB
In all other aspeEtE,it appPars that the re+erencedplan meets the intent o
Re
KE
sp ectf submi t ted ,
& ASSOC I ATES
KGO : rrk Ke
G.
e
E
cc:Lager 1o{ Construc tion Eo.
f tss
Job No. 487 I Page 2
KENNETH G. OSBORNE & ASSOCIATES
b
N
t)
o
?
.\>
/)
t-
N
KENNLTT{ C. OSBOI(NE & ASSOCIATES
I7I,1I ML]NP}]Y AVENUE, !;UIII] O
tftvrNf cAl tts'oRNtA 02lo5
KENNETH G. OSBORNE & ASSOCIATES
GEOTECHNICAL INVESTIGATION
(1een11ne Building
Fairviev and Alton
SanLa Ana , CaJ.if ornia
Client:Lagerlof Construction Co.
1607-L E. Edinger
Santa Ana, Californl a 92705
Job No. 4871
November 5, 1987
GEOTECHN ICAL E NGIN EERING 17111 MURPHY AVENU E IRVINE, CALIFORNIA 92711 (7la\47+2001
L
I
L.
L
t
TABLE OT CONTENTS
INTRODUCTION- --- - -----
FIELD lNVESTIGATION---
SITE DESCRIPTION-.----
SUBSURFACE DESCRIPTION
LABORATORY TESTING----
DISCUSSION-
CONCLUSIONS AND RECOMMENDATIONS-_-
General----
Fouodation DesignA. Soil Bearlng----------
B. SeELleEert-C. Lateral Soil Pressure---------
Retalnlng !Ja11 Desi gn
Expanslve Soi.1s------
SolubIe Sul fa tes---
Stabillty of E x c a v a E i o n s - - - - - - - -Slopes-----
Construction Conslderations------
Concre!e Slab C o n s t r u c t i o n - - - - -
PavenenE Design-----
Grading----
Si te Desi gn
GeneraL----
APPENDIX
Laboratory Testlng Procedures-
Grad 1ng Spec i fica t ion s-Genera 1 Provisions---
Boring Logs-------
Pressure Consolid at i ons--------
Direct Shears-----
Boring Locatlons--
Page
I
I
I,
,)
.|
2
J
J
3
4
4
4
1
5
5
6
6
7
9
L
L
L
I
L
A&B
C-E
F-J
x-Q
R&S
T
L
IL
L
L
L
Job N0. 4871
I N TR ODU CTI ON
Thls re Por t presenta Ehe r esul ts of
performed on Ehe ProPerEy locaEed on
of Alton Avenue and Pairviev StreeL
Mesa, California.
Planned for constructlon is a
offlce/varehouse bullding vhlch rri11 be
t ype. IE j-s expected thaL the structure
on boch continuous and pad footings
concreLe f loors.
FIELD ]NVESTIGATlON
The exac ! structural Loads for the building are unknovn
at this LiDe. However, for the purpose of analysls' 1t has
been assumed that contlnuous footlngs w 111 carry uP ro 3000
pounde per linea1 foot and that Pad footlngs v111 carry up
to 100 kipa each of whicl.r 60 percent is dead 1oad. Minor
inLerior cont i nuou s footings u sed to suPporE Partition loads
are expected Eo carry about 500 pounds per 1i neal foot'-If
it is f ouncl that the act.ual loads are subsEantially
different from those .rssumed, this office shoul d be notifled
f or reevaluation.
the borings
Locatlona are
Page 1
a Geotechnical St udy
Ehe northvest corner
in the city of Costa
ploE plan Ehovlng
vith this report.The logs of
approxlmate borlng
The locations
f ield by neasuring
The field investiSation consisLed of excavating flve
exploratory borings to deprhs ranging from 16. to- 26 feet 'Th; borings uere drilled uslng an i8 inch bucket auger
drilling iig. Se 1ec te d sPecimens of the in si tu soils vere
obtained by us ing a 2.5 inch I.D drive tube sampler equipped
nlth liner r1ngs. In additlon to these relatively
undisturbed specimens, bulk sampl'es of Ehe solls rJere
obtained for ;ddltionsl laboratory analysis. These eoil
sanples gerved as the basls for the laboratory Eestlng and
the engineerlng conc l usions conLslned 1n th13 report.
and a
lncluded
L
The elevatioDs shovn on the bor in g logs
by hand leve1l ng uslng an assuroed elevation
Falrvlew Street 6s Ehe reference base.
vere deterolned
of 100 feet vlth
of Ehe borlngs vere deEermlned ln the
froo p ropert y 1iDes.
L
single teo-8torY
of concrete t11t-uP
v 111 be constructed
vl th slab-oo-grade
I
I
!II
a
I
D\
s<il"*rs
I t'
u{'\ tE.\axDaI a
RESET\,r.TlOli
22
I.'l I r
I,,.
/-.
,t!,
a h
I I Et I
rl
!rl
*'
a i!
t a II-lr t aa
a !l t:II'{Iri i'a I
f,
l w it
?7 'l'
==iJ-
aI
Creer I
/rE:
2
Iz
q
,i+'.E-'{-ara}
.,,.I;lE=tg*n+r,t-o"=s4*+'tr]i:i=--.=*=1$tf
r-
I
6CALE: t'. 2OOO'
I
t
SITE LOCATION MAP
BEFEREXCE tlAP: U.8.O.8. OUADRAXGLE, XEWPORT BEACH
cA.
L
PFOJ. r{O.
487/
DATE
/,/.5 E7
L
L
L-
L
Eri
1
Y'
I
I
I
Job N0.4871
SITE DESCRIPTION
Page 2
The site 1e locaEed 130 feet norEhvest of Alton Avenue
and Fairview SLreet 1n the clty of San ta Ana , Ca 1i fornia. It
is bordered to the south by a 77,5 feet Yide Edison Coopany
and railroad easement. The Yest property line is bordered by
the 0range CounLy Flood Con!ro1 district easeBent. A
recreationil vehicle storsge lot is found adJacent to the
north. The site is presently used as a sEorage yard for
geveral ooe-story h ouse s up on blocks I sol!e heavy equipoent
and trucks, along vith garages' A large portion of the
northeasE quarter 1s 1a id dovn vi Lh concrete s 1ab under the
garages. The proPerty i.s 1evel and has a sotl and gravel
grouna sur fac e . It is currently fronEed at the east end by a
one-story office bullding and nobile home . The vest ha 1f is
fenced off and currenlly Yacant and Hith a loose so11
surface. Sooe snaIl stockpiles of asphalt and concrete are
loca Led in the gouthuest corner.
SLIBSURFACE DESCRIPTION
Subsurface i nvestj gation revealed allts and s1l ty clays
io depchs of. l2 to l4 feet ' The)' vere firm, danp to EoisE'
and slightly to moderately porous. A fat, Eolst clay vith
hlgh plastlcity vas found belov the s11ts to the botEom of
the borlngs. Poroaity vas &inioal rith occasional volds.
Minioal organi.c Baierial uas noted throughout !he borinBS.
No cavlng vas encountered in any of the ho1es.
No Sroundj.nYestigation.rater uas encountered during the subsurface
L
L Mor e detailed descriptlons
are shovn on the a t t ached boring
Descriptlong
1n v e s t 1g,a t 1o n i n
iovestigation are
DlSCUSSION
]t 16 the opinlon of t.his
suitable for Lhe construction of
of the subsurface conditlons
1ogs.
LABORATORY TESTING
The laboratory testlnt consisted of performinB strength'
settleDent, "R" Va 1ue, soluble suIfaLe, and expansion tests r
determlnlog 1n situ dry denslty and moisture conLent ' and
determinlng the Eolsture-densiLy relationshlP of naJor
so11s.
of test standards used in thls
addltioo to other tests not used 1n this
lncluded 1n Lhe Appendix of this rePort.
office that
the proposed
thls slte ls
development.
I
I
L
In our professional opir,ion, the si te ls
sultable for development as proposed. The
bul t ding construction sho uld be co nd uc ted in
rhe provisions of the Uniforn Buildlng
including ChaPters 23 and 70, as adopted by
agency.
Job N0.4871
The f o11ovi ng
developoent of
conditions
this proJect.
OPINIONS
rere found
Page 3
affectlng the
Beotechnlcallyearthrrork and
accordance wlth
Code (U. B. C. ) 'the controlllRg
based on footings
teeted coopacted
CONCLUSIONS AND
General
The above bearlng
placed iDEo approved
f111.
Differential
toEal setElement.
se ! ll eneDt v111
applied.
settlement 1s expected to be L/2 of the
1E 1s anticipaEed Lhal the maJority of
occur durlng constructlon as loads are
L
Foundatioa Desicn
A. Soil Bearinq
The sol1s on this project, vhen properly coopacted, are
considered suitable for the support of the proposed
strucLure using shal lou contlnuous cr pad foorings.
Footlags Eay be desi'gned for an a11ovab1e besring value
of fg25 pounds Per square foot for footings placed to a
Elniouo vidth of 12 inches and a ninlmuE deprh of 18 loches
belov the 1o!rest adjacent finished grade. Thls value nay be
increased by 300 pounds per square foot for eac h addlEional
foot in nldth to a maxircum value ot 2825 pounds Per square
foot, An increase of l/'3 of the above bearlng value is
permi ss 1b1e for shorE durat ion loading.
values
natural
have
ground
been
or
L
B. SetLlement
Calculat.ions of setElement have been nade baeed on
resul ! s of c onsol id a t ion tests, the anticipated load in g and
settlement characteristies of the in sltu soi1s. These
calculations indlcate that footings under snticipaLed
loading cond i Lions vl ll Bet,tle aPProximately 3/4 l uch.
L
L
I
Job N0.487i Page 4
In order to reduce the EaSRitude of settlement to the
generally accepted value of l/2 tnch ' the 8oi1 undcr the
iootlags shoul.d be removed and recompac Led. The grad 1n g v111
be perforoed 1n accordance uit.h Ehe Gra d 1ng Speclflcations,
Lateral Soil Pressure
our opinton t.hat soils existlng on slte are
ad equa t e for backfill of r e ta ining va11s.
wi!h adequate
For purposeB of resisting lateral forces, an all-ovable
lateral so11 preseute of 25A pounds per square foot per foot
tray be used for Ehe buildlng design. A coefficient of
fr ict 1on of 0.43 Day be used for concrete placed directly on
the natural soils. These values may be used together for
reslsting lateral forces.
Retainlnq l,Ia 11 Desi en
Ret.alnlng ua11s Day be designed using the folloving
paraneiers:
Bearing - 2000 psf
Actlve earth pressure, leveI
Slidlng coef ftclent - 0.43
Passive earth p r essure - 250
backfill.32 psf /f r
pst /f r
IE is
consldered
L_
I
Retainlng va11s shoul.d
drainage to control hydrostatlc
Expansive Soils
be provided
pressures.
tesLs j.ndlcate that the soils exlstlng on
1ov expanslon potentlal. The Les E resultsthe
are
The results ofsite possess
as f ol1ows:
B_i@1_2r 113.8 t6.t1 22
No speclal construction is considered necessary for
expanslve soi 1s purPoses on this proJect, however, a final
d e Le rnina t ion wi 11 be mad e at the cotrplet.ion of grading.
Soluble Sulfa tes
The results of
concentratlons
as f o11ows:
Maxlmum
Denslty
tesEs shou
of soLuble
0p!lmum
Moisture
tha t the on-site soil s PossessBulfate6. The resul"Es of tests1ov
are
L
I
Location
Expanslon
fndex
I
L
B-1@1-2'0.045
A soluble sulfate content less than 0.20 percent 1s uoL
considered detrlEental to standard concreLe nlxes. As a
resul!, no special type concrete or coostructlon 1s
consldered necessary for soluble su 1fa tes for thls project.
SEBb11lE of Excavations
Even though no caYlng Yas experlenced during the
subsurface exploration ' it can be expec ted that instablllty
of utllity t r enches or other excavatj.ons u 111 be experlenced
and , as a consequence, shorLng or sloplng excavations ni 11
be required to proLect workerg. The contractor should refer
to Lhe 'State of California, Dl vi s ion of Iadustrial Safety
for mininum safety standards '
Job N0. 487L
Saople
Location
No s urc har ge loads shoul d be
unreEained excavatious. Dralnage
direcEed avay fron the banksprevent saturation of the soi1s.
Page 5
perml!ted above unshored
above excavatlons should
and care should be taken
or
be
LO
I
L
L
I
L
L
L
L
Consiruction Con sideraE i ons
Special precautlon should be Laken Lo disEribute the
loads d ur lng t 11t 1ng of pan e 1s on con Einuous footinBs. Th 1s
Eay be acconplished by t 11t 1ng the panel on tr.o convenLional
end pad s and dr 1v 1nB ehims or pouring additlonal grout pads
betveen Lhe panel and the foo t lng at inEervals adequate to
epread Ehe loads betveen the end pads. The inEernediate
s u ppor ts should consist of na Eer ia 1s capable of transferrlng
loads ni thout crushing. Al ter na L1v es acconplishing the s aEe
load dlstribution nay be us ed in lieu of the above. Fallure
of the coo!ractor to fo 11ou P r oper precautlons !o dlstrlbute
panel loade durlng t.11ting onto coItlnuous footlnSs nay
cause a fallure of the footlngs durlng the ElltlnB
oPeratlons.
Consideratlon should be gl ven to Probable alab daoage
re6ultlng from crane loads at. the tine panels are tilted.
Ext!eBe cautlon should be exercised to ensure adequate
ZSoluble
Sulfates
I
L
Slopes
BoEh cut and fill slopes on this project should be
construcLed aL slope ra t ios of 2:1 or f 1att.er.
Job N0. 4871
dlstrlbutlon of crane loads to
sIabs. Tt 8t 811 Possible, Panelsexterior of the bulldings.
prevent cracking
should be tllted
Page 6
of floorfroE the
I
It is cautioned that c o ncre re slabs in areas to recel-ve
ceranic t.11e or other crac k sen s iEive floor cove rl n8s musE
be deslgned and consEructed to mininize hairline cracking.
lrtherever the floor slab is uo be subject to vehicular
traffic loading suc h as forklifts, especially fr oB those
with hard rubber vheelsr the performance of the slab 1s
critlcsl vj.th resPect to Eoveoents and spalllng at the
control joints and supporting capa ci ty of the concreLe. If
such usage is anticipated, the oHner should notlfy the
contractors and deslgn consulEanLs so that approprlate
treasures are !akerr to reduce the rlsk of floor slab
failures. The folloving construclion procedures are
presented for consideration:
]. The f i ni shed grade of i-he building pad sho u1d be nade
by overf11llng and cutLlng back to a f lrm coEPact surface.
2. The concre!e contractor should be prohiblted froo
spread in g so11 froB fooEing exca va t ions oD the bui 1d ing pad
u nder these oaterlals are coEpacced.
Concrete Slab Constructlon
It is our opinloD that concrete floor
areas or in other areas to be covered
sensltive cov erl ngs be con slruc t ed over
meobrane, The Plastic nenbrane should be
sealed, and p r oLected Ylth sand.
3. If an adequarely conpacted
roaintalned, the use of a 4 inch Iayer of
base strould be considered belon the s18b.
Pavemen t Desl
The project structural angineer ehould be consulted
regarding the deslgn of slab thicl<ness reinforcing, and
controt Jolnts for thls tyPe of ioadlng. A coef ficient of
subgrade reactlon (X value) of il5 ps1/1nch roay be used for
deslgn of rhe concrete floor e 1a bs.
slabs 1n office
wi th moisture
a 6 roil plastlc
proper Iy lapped,
surface cannot be
compacted aggreSate
soil has been determlned by
1n accordance wi th Californla
of rhe Eests are as follovst
I
L
t
I
L
n
The st.abllity of the
performing *R!t Value tests
Te6t Hethod 3016. The regulLs
L
L
L
I
I
t
Job NO. 4871
Locetlon
Page 7
Tr=4.5 2-t/2"AC/4nABTI=5.5 3"AC/5r'AB or
Alternate 2-l / 2t' Ac / 6" AB
trRrtvalue
P-1ra1-rr l+9
An trRrr Value of A9 and the follovlng assumed trafflc
indexes have been used to conpute the fo1loL'1n8, pavenent
sectlon io accordence \iith the 0range County Road Department,
design procedures:
Parking Ar eas/Automobl les
Driver"'ay Areas, Autos and
LlBht Trucks
Dr lveway Areas, Truck
TI=3.5 zttAc/AttLB
I E is assurred in Lhi. s design that the subgrade eolls
imEedi.ately beneath the aggreBate base w111 be conpacted to
at lesst 90 percent of maximun density.
Unless ot-hervise specified, aggregate base should
conforo to Processed !'liscellaneous Base as Per the Standard
SpecificaLions for Public l,'orks Construction, latest
"iition. Aggrega te base should be comPacted to 95 percent of
Californla Tes t lierhod 216.
Unl ess other\dise specified, asphalLic coocrete should
conf c,rm to Section 39, State of California, Caltrans
Standard Speclfications, latest edition. Asphaltic concrete
should be Type B, 1/2 inch naxinuo slze, medi.uo graded.
Since Ehis design is based on a ssuned traffic data ' this
of fice shou 1d be notified 1f def ini te lof orrnation becomes
available vhlch rdarrants an 6lteratioo of the deslgn
pa veme n L section,
It should be noEed that grading of the proiect. Eay
the distribution of subgrade so1ls and, as a
additional testing ni11 be needed afEer Srading.
alter
such,
recommended
the Grading
the Appendix
Thls paving determination rnay be subjecr to approval by
the governing agency vho nay have nininuE requireGenEs.
GradlngI
I
I
I
I
The folLowing special Sradlng provisions
for the gradlng of this project 1n addition
Speclfications, General Provlsions included
of thls report.
are
to
in
L
I
t
Job N0.4871
1. The natursl
shal1 be scarlfled
below the existing
1s deeper.
6. The soils bel or., the bottom
coEpacEed Lo at least 92 Percenf,
deteroirred in accordance yi th A. S.T.M
Page 8
soils f 111 outside of the bui l d1ng area
and compacted to a deprh of 12 inches
surface or finished subgrade, vhichever
2, The so11 i.n ghe bullding area sha1l be reooved to a
depth of 24 lnehes belov rough pad grade or exl st 1n I Eround
s uifa ce uhlchever 1s deeper, the exposed surface scarified
and compacted to a depth of 12 inches. Removals should be
performed to a ninimum of 5 feet outside the bullding 1lml t s
or as property 11ne c o tr s i- d e r a t i o n s dictate.
3. Natlve soil 1n footing area shall' be renoved and
recompacLed to a depth of aL least 3 feet below the boLLoE
of tire footlngs. The reo,oval sha1l exEend to at least 5 feet
beyo nd either footing edge '
4. Soil ut11lzed for fi111ng shal1 cons i st of approved
on-site na Ler ia 1s or imported so11'
5. A11 iBported so11 sha1l be approved by the Soils
Engj-neer for both expansi.ve and s!rengEh qualities Prior to
inportation on to the projec E site. Final ac cep tanc e of any
iropo:'t sr:i1s will be based on the soil ac!ua11y delivered to
the siEe.
7. Except for subgrade
coEpacted Lo at leasE 90
deteroined in acc or da nc e vlth
of
to
Si te Deslgtr
of Lire footlng sha11
of na>;imum densil-y
Test MeLhod lJ-1557.
for paving, a1l fill sha11
perceot of rBaxj-auE densily
A.S.T.M. Test Method D-i557.
be
as
be
as
o
the
the
All Bradlng plans should be
project soils englneer for
s Eart of construction.
forvarded
reviev and
to the offlce
comnent prior
This project
grades adequate
consLrucLlon.
be designed and
ensure proper
constructed at
drainage af t.er
L
8. Areas Eo receive Pavement sha1l be comPacted to a
mlnlmum depth of 6 inches belon flnished subgrade. Final
eubgrade coEpactlon should be perforned Just prlor Eo
placlng aggregaie base after conPaction of 811 utillty
Lrench ba ckf 111.IL-
should
to
L
Job N0. 4871 Page 9
General
It has
geotechnlcal
excavations
excavaEiong.
report.
been assumed, and 1t 1s expecged' that the
condltlons vhlch exlst betl,een the test
are s1m11ar to that encounLered 1n the those
Hovever, no va r rant y of such 1s inplied 1n this
I
L
The conclusions and o pl n lons cootained 1n this report
are based on the results of the descrlbed Eeotechnlcal
eval ua t 1o ns and repre sen t our besL engineerlnB Judgment'
The flndings, conclusions, and oplnions con t a ined in this
report are ro be considered EenEatlve on1y, subject to
co;firmation by the undersigned engJ-neer during the
constru ct lon process. Without this coofirEatlon ' thls reporL
1s to be considered incomplete and this firn or the
und er si gned professional assr:oe no responslbiliEy for its
use. I; addilion, this report is considered valid for a
perlod of one year.
L
I
This report is issued with the understanding Eha L 1t
the responslbility of t.he ovner or h1s represenLattve
ensure that lnterested persons have this inforEaEion.
is
to
L
This reporE is subiect to revleu
authoriEies for the subJecL project.by the controlling
Re
KE
"pt .ctful bmit t
&
ed '
/-ETH. G.E ASSOCIATES
I(l
L
L
Ken
G.E
et 1\n e
ilu
I
I
f,G0:rrk
APPEI{D1X
L
SHEAR STRENGTH
The ehear strengEhperforming direct shear
te6ts.
LABORATORY TESTING PROCEDURES
of the soil is determined by
tests and unconflned conpression
I
Direct shear tests are performed on both undisturbed
specirnens and on samples r emol ded to va r ious dens itie s nhtch
re presen t anticipated condi !ions 8t the f j.nlshed site. The
sanples are either tested s! in siiu Eolsture or are
saturaled to sltrulate the nosE severe field condiEions
anticipated, The relationship betHeen normal sLress and
shear tests is shovn on the aLrached Direct Shear Sumnary.
The unconfined shear str enSth of selected undlsturbed
specitrens is deternined in ac cord ance vith A.S.T.M. Tesl
Method D-2166. The results of these tests are shovn on the
Bor i ng Logs.
EXPANSION
II
L
L
Tests for
conpac re d so11
Method 29-2.
v ol ume change vi th Doi st ur e are performed on
in accordance vi th Unlform Building cod e Test
L
L
S ETTLEMET{T
The settletrent characLerisEics of the 1n si !u so11 are
determined by perfornlng consolidation tests on undisturbed
or remolded speciEens. The samples are tested 1n the
original sample liner rlng and the lncrement loads for
consolidatlon are applled for periods of 12 or 24 hours by
neans of a s1ng1e counterbalanced lever systeE. The pressure
setlleI[ent curves are shovn on the attached pl.ates.
MOISTURE DENSITY
L
The ool st u re-den s 1t y rela t ionship of
or types i8 detertrined 1n accordance
Method D-1557. The test results are
Logs.
the major
wit.h A. S
shown on
1 type. Te s t
Boring
soi
. T ,l,l
the
't /87 Page A
i
I
t
I
CLASSIFICAT]O}i
The folloving test
classlficatlon of soils
Classification system:
me thod s are
1n accordance
used
wlth
to
the
ald in the
Unified Soil
L
L
L
L
L
I
L
L
L
L
I
2
t.s.T.l'1 .Tesu
Test
Te s t
Hethod
Hethod
Method
D-L2Z
D-tl23
D-42/1
A.S.T,H.
A.S.T.M.
The resul ts of grain size lests, r,rhen conducted, are
shoxn on the Gradlng Analysis sheets. The results of
c onsl6tenc y tests are shown on the Borlng Logs or tBbulated
in the Appendix of this rePort.
RESISTANCE IIR'' VALI]E
The resistance t'R" Value of soils
deternj.ned by means of Callfornla Test
to 6upport
Method No.
pa v enent is
301.
SAND EQUIVALENT
The sand
ag8reBetes is
l'lethod D-2419 .
equivBlent
deterr,ined
(S.E.) of granular sol1s and
in accordance with A.S.T.M.
flne
Te s t
SOLUBLE STILFATE CONTEIIT
The concerrtraEion of soluble sulfaEes 1n the soils 1s
determined by A.S.T.)'1 . Test Hethod D-5i6, llethod A and 1s
expressed as a percentage by ueight of the dry so11 tested.
L
L
L
L
L
IL-
7 /87 Page B
RESPO}iSIBILITY
I . The
o,rnert6 orpurpose of
Lhe soil
perforned
responsiblereport.
GRADING SPECIFICATIONS
GENERAL PROVISJONS
soils engi ne er end engineerlng geologlst sre the
bullder t s representative on the proJec E. For Ehe
these speclfica!ions, observBtion and testlng by
enBineer includes the observBtion and Eesting
by any persor, or persons employed by' and
to, the licensed civil engineer slgning the
2. All clearlng, 6iie preparatlonr or earthwork
performed on this proJect shal1 be conducted by the
contractor under the observatlon of the s o11 engineer.
3. It is the contractorrs responsibility to conform to
the Grading Specifications for the project and the
applicable grading ordinances for the jurlsdiction in vhich
the project is located.
CLEARI}iG
L all veBetable
sEuDps, 1ogs,
1. The site sha11 be cleared of
lncludlng but not limlted to trees'
hea vy weed grovth, and organic deposits.
2. A11 houses, barrrs,
r eoove d froo the site,
or oLher structures shal1 be
3. Unless otherL,ise approved, the f oun dat ion and slabs
left f roo the demolition of structures shail be renoved f rom
the s1te. lncluded ni th the renoval of foundatlons and slabs
shaIl be the removal of basenents, ce11ars, cisterns ' geptlc
tanks, paving, curbs , pi pes, a band oned ve11s, both vater and
petroLeuE, or other deleterious maLerlals. lio cavi t y left
from demolltion sha1l be backfilled until 1t has been
observed by the soi 1 engineer.
4. Unless oEhernise speclfied, all cleared materials
sha11 be reraoved f rom the boundarles of the ProJect to an
approved disposal slte.
7 /87 Page C
grovth
trash,
L
L
L
L
l. Loose sot 1s Ylthin aress of fill sha11 be processed
by either excavaLing and sLockpillng the loose so11 or by
siarifylng' sdjusting the so11 Eoisture content to the
aDount s!ecifiid in thls rePort, and corEPacting to-the
recoonendLd relative coopsctlon 8s determined by A'S'T'X'
Tesr l,lerhod D-1557,
SITE PREPARATION
2. The soils vlthin areas of f111 placeoent
processed to a depth adequate to insure Lhe renoval
ir"" roots and piPe l1nes and the compaction of
left fr om tree removal.
sha11 be
of na jor
csvlties
L
4. Cesspools sha11 be punped of liquids and.solids and
backfilled with clean sand or pea gravel. The sa nd backf i1'1'
vhlch sha11 be approved prior to use, may be flooded and
Jetted for obtaini n g compaitio, ' Any unsuitable backf iI1 of
iesspools shal1 be removed when found to be not in
co*piian." rdiEh the recoErDendai-lons contalned in the
report(s). The preparation of cesspools sha 11 be observed by
th; soil enginLer, Pernits ooy be required by the local
governmental aBency f or this proJect and - -thelrJpecifications ior abandonmer,t, 1f anL should be
considered.
5. Abandonment of oi1 r'e11s sha11 be in eccordance Yith
California State Lav. The backfilL of cavlLies resultlng
from the abandonment of oi1 ve11s sha11 be coopacted in thln
1j.f ts und er con Linu ou s observa tlon of the soi 1 engineer as
specified in "Slte Preparatlon", Iten 3 above.
6. UnL es s oLher\dise specified ' the tops of any abandoned
subsurface structure sha11 be reooved to a depth of 5 feet
belov the f i n lshed grade in bu 11d1ng areas and Eo a depth of
1O feet below flnished Srede 1n all other areas. The area
when backfilllng 1s required shal1 be perforned 1n
accordance wlth ttSlte Preparatlon", Itens 3 and 5 above.
3. Excavatlons required for the renoval of subsurface
6tructures sha 11 be cl eared of any loose soil ' the reBultlng
surface oolsture cond 1t loned , and fi11ed nith conPacted
soil. The ba ck f 111 of such excavations sha1l be c ornpac Ee d to
the relative c ompac t ion reco:rmended in this report.
t_
L
7 187 Page D
FILL PLACE}1ENT
1. tlnlessdisposal plan
cobbles over
f 111.
otherL,ise a pprov ed end unless
1s shown on the plens ln
12 in ches in dianeter sha11 be
a s pec 1f 1c rock
th 1s report, no
accepted in any
2. All on-siEe and iEported eoils to be used for en
englneered fill sha 11 be subjecE to the approval of the soil
englneer prlor to placetrent. Prelinlnary approval of a
source of lmported soi I sha 11 rrot relieve the contractor of
delivering proper oaterials to the slte. Flnal acceptance of
iuported soil will be based upon the traterial actually
del ive red to the slte.
3. The placeoenE of fill sha11 conforo to the rrSpecial
Grading Provi.sionsrr presenled in the bod y of this report.
4. Fi11 sha 11 be placed in rrear horizootal lifts vi th I
Eax j.nuB placed thickness 6 uch !hat the required conpaction
can be achleved vi th in the entire 1i ft thickness.
I
t_
Il-
I
L
t 7 /87 Page E
SUPJACE ELEVAT T ON
SH
89 l1.6 i
SAND, s11ty, yelIov f iru, ellgh
porous, thln gra veI, baeecover-clav 1aver. soft . oolst
ML
17 .093 P s11
91 19.8 2
CH
SAND, si1ty, o1i ve grey, f lro
d amp, e1lghtly porous, trace
nodulea
CLAY, s11ty, yellovish brovn,
,Doderat.ely flru, molst,
sliBhtly porous
I xWs tlltL.\+ola"1E*,E{.,r, o'-g
83 11 1 1
SM
83 36 .1 P
c0 31.f ,)
2
Lfl
89
10
12
14
I6
iu
20
26
6
B
.l
-l
11-
SAND, si1ly, ye11or,, f irn,
danp, s 1i ght 1y porous
CLAY, vith sllt, d6rk Breyooderately flrm, nolst,
porous, trace organics,
trace nodules
s11ght1y porous r ver y Eolst
Bot tom of
No Cavlng
No Ground
Boring 26r
vater
}:E\\ETIJ C. OSBONNE & ASSOCI.'ITES
BORING LOG
?EST HOLE NO.B-1
F.J
th.
LJUo\
>or(!
ztrc> l-r
FIFFL,
Ja.LltclO
U
u.ic)F
V.
o,:
F
FtrA&
L:O7
<nr.i C'&&LlxF>du-I
ZJO
OF,tA<
UO F.{NE
3r, (4
FT ('Jv<
o
bcs xo,
1487 l STSHEET I or I3U{.J
F
z'!),OLI
x.vi<AI] ,-r
o
Fd
Q.Z
L]z
lrih
IIIII
I
Page F
L-
28-
SURFACE ELEVA? ION
r a1 u6 rovn,trace ri)I or an p
ICveoan
Il-
2-
b-
6-
r
1d
tr
rc
1
I
7t LL
103 10.'SIND, al lEy, o11v e gr€y to
yel lovt sh brovn , fine, dense
daorr- trace of voJ ds
9i 2.2 SAND, poorly gra ded, fine,
1oose, dry
HL SILT, c1aye,, Eoderately f lrm
Eolat, altghtly porous,
o11ve grey
SAND, ellty, ye 11ov, f ine,
denee, daop to nolat,
99 2 -1 1
1
SM
CL
8q 18.8
ICLAY, eilty, oli
I roderately flr
l__sl1ghtlv porou
ve b1ack,
D, Eolst,
s. trace organlc
Bottoo of
No Cavtng
No Ground
Borng 16r
Uater
83 35 .l+
(.u
a,
oluo\
>n/.ca ,-a
t.
z,
,l:,OU
xv)<.oI.-l
z!cc
l.l F.FU(<JA.t!tr(o
FEl!Ft)trt&
L)O2
z,JO
OIr'6O l.(!)&HF's. t,,:>aO
33
U
j<t]FrOec<6JIt->4u.f
KEN\-ETH C, OSBOIi\E & .4,SSOCIATES
BORING LOG
rES? HOLE NO. B-2
JOB NO.
4871 7 S!{EET t oF t
DATE Irot20/d
Paoe C
20-
s l.{
.:..,.:.'..'SP
t:
&,
Fa
z
o
Ftd
Ez
lr:&
I
l
I
2'
6-
o
10-
12-
I4-
16 -
t8*
lu
22
ML s r hEu p",11f,?1,' otEdts,brovn, f lru
S ILTIS AND, ye1lov brovn, flne,
den se, danp, s 11g ht 1y porous
SAND, poorly graded, f1ne,
yel lovlsh grey
101 6 5 SH
4.6 SP
o')26 ,6 CLAY , eilty, very fi rn, tolet
porous, ol1ve grey
sandy9032 .4
CH CLAY, silty, grey-b1ack, soft,
Eoi st r trace of organlcs
firu, moist, sllghtly poroua,
Bot uon of
llo Cavlng
No ground
Boring 21r
I'later
87
96
a. t)
o,
td t)o\
>f)&AO-.
c..
z.D=oo
Y,O<.o!.-r
7-t!o>FlriFFU4<,la&txt(oU
elE
F
U)
o:!
z
F
&
hzzuA
t-FtrF lrlALt)C2
-l<JtioEGr.r EF><at
zJO
OFo<(JoFi!i L.HFI!i(4* tt)7-<
U
IiIINNETII G. OSBOR\E & ASSOCI.TITES
BORING LOG
TEST HOLZ NO. B-3
JOB NO.
4871
D^TE Ito/2o/d7 sHEEr I oF I
Page H
SLIRFACE ELEVATION
I
vt
SURFAEE ELEVAT I ON
L
L
I
I
T
t-
6-
,l
r cr'1
,;
1 ;
I
18-
20-
22
t.t
26
al CLA Yto ,. Blltr Tioin, IliE, ditdalrD. DorouE
SAND, s11ty, ye11ov brovD togrey, flne, dense, danp,trace of vo 1d a, trace
organlce
86 14 .9 SH
95 3,r
93 25.5 CL CLAY, eandy, !he grey-brotn
f 1rn, nolst
SAND, s11ty, flne, y e 11ov brovn
dense, Eoist !o veE
3H
CH CLAY, WITH SILT, OLIVE
sof t to flrm, Eolst,of organics
black
trace
firE, rnottled
Bot LoE of
No Cavlng
Ho Ground
Bor I ng 25r
I{ater
91 30. 7
89 33. I
F, .r
@,
truo\
>G&AO-i
F.
U) u{ztl{,oL)
x,<.oZ,I
z3!c> l.rHFFU
IAlri Xr(o
U
H&
ts
U)
o:t
2o
F
ct<,N2!l&
F
Fb:
$ r..
d2
tl<tI
F.r o!(c
Irl Xri>d. u,I
u,ro
l-.1 Hot<'6OxLt&HH0r(nl-l tJ)
B5
U
XENNETH G. OSBORI\E & ASSOCIATES
BORING LOG
TES? HOLE NO. B-4
SHEET 1 OF 1'8E,Io '1, 82IBr {,
Page I
I
,'
I
t
I
SUF.FAC9 ELEVATlO}i
14.(82
a1 abJ
23.088
SAND, s11ty, y e 11or grey,
d enee, damp , alightly poroug
oliYe to te 11ou Erey ' verY
f irn, notst, Eoderstelf
POTOUS
cv
ML
t3.278!
SILT, yelloYlsh broYn, noderate
firm, nois!
CLAY , si 1ty, o11ve b1ack, soft
lit o
h
fdte
1
no i s trat.e1
er
rrm,
Botton of
No Cavi.ng
No ground
Bor i ng 16r
WAter
t9.
s-11
ilty sand 1a
BORING LOG
TES? HOLE No, B-5 i
J(rJF.Cga
tr: ,lFt'< l,:r
,.,JO
OFU)(,UOHL:L
aL(,t4 l/1'ln1
()
2"o
t-4l(
F,
b:
,\
F,:Ell.:FL)LLt'
t,
z,lr'oo
xt<.c
7-trl C>'"r
r-< FFU
JAtIXc(o
U
F!
ta.z,aioo\
>n
OP
II
I
xL\NE'lt{ C. OSII(JIi\tl 6i ASSo(ll.\TL,(
Oi1 NC.DA?E
ro /20 7 SHEET I OF I4871
Page J
IL_
I
l-
I
I
1
l
I
I
1
CH
Ir:tr]F
V,
T.
I
l
L
L
KENNETH G. OSBOHNE
& ASSOCIATES
PRESSURE
CONSOLIDATION
0.1 0.2 0.3 0.4 0.5 1.0 2.0 3.0 4.0 5.0 10.0
0
2
g
EJa
CL
iIF
o
=oo
oo
3
{
5
6
7
8
9
10
\)
I t
$
.l
I
i
I
I
I
SAMPLE INFORMATION
Borrng tlo I -/ ,
Sample Oeplh: ,. # '
4867 tt/skt
I
Page KL
PRESSURE - kips per ft.2
1
-l-\l
i I
l i
I
I
I
i
I
t(60
KENNETH G. OSBORNE
& ASSOCIATES
PRESSURE
CONSOLIDATION
fl57
PRESSURE - klps per fl.2
0.1 0.2 0.3 0.4 0.5 10 2.O 3.0 4.0 5.0 10.0
0
a.,o
o
CL
zo
tr
o
=oozoo
4
5
6
8
I
10
-o-+tI
I
I
?
,
\{r
I
I
\.l I .\s,
I
I
SAMPLE INFORMATION
Borng No. J -/
Sample Deptn: 51 6 '
u/qbt tr60
Page L
L
l-
1
\t
a
i
I
PRESSURE - kips per ft.2
0.1 o.2 0.3 0.4 0.5 1.0 2.0 3.0 4.0 5.0
0
2
c)o
c!oiIF
ofo
cr)
o
c)
4
5
5
7
6
I
10
lL-
-t t-
I I
I It
(!
I I
I
l
I
KENNETH G, OSBORNE
& ASSOC]ATES
PRESSURE
CONSOLIDATION
4€67 tr/s/et /(60
SAMPLE INFOHMATION
Boring No. fi - /
Sample Cepth: / O'- tJ '
Page M
I
10.0
1
\t-
ffi-l
L]
I
I
PRESSURE - kips per ft.2
0.1 0.2 0.3 0.4 0.5 1.0 2.0 3.0 4.0 5.0 10.0
I
0
2
c
c)(J
oo
IF
ofo
U'
o(,)
3
1
t
et
I
8
10
I
L.
*-, -
I
\
I
I
I
I
I
)
l
S
I
I
I
-l
$
i
KENNETH G. OSBORNE
& ASSOCIATES
PRESSURE
CONSOLIDATION
?867 t/s/ar K6o
SAMPLE INFORMATION
Boring No. t -/
Sample Depth: /S - /a
Page N
I
I
1
I
F
L
L
L
L
L
KENNETH G. OSBORNE
& ASSOCIATES
PRESSURE
CONSOLIDATION
t067 u/sbz K60
PRESSURE - klps per ft.2
0.1 0.2 0.3 0.4 0.5 1.0 2.O 30 4.0 5.0
0
,
c,o
o
;
o
F
J
ozoo 7
I
10
l
\
r{
Irs
I
I
I
lll
llr
SAMPLE INFORMATION
Boring No. !-f,
Sample Depth: J14'
Pag,e u
L
I
10.0
1
6
--{--
I
I
I
I
l
KENNETH G. OSBORNE
& ASSOCIATES
PRESSUBE
CONSOLIDATION
{867 ry's/q kc .'
PRESSURE - kips per tl.z
0.1 1.0 2.0 3.0 4.0 5.0 10.0
0
1
troot-q)
CLio
tr
o
Joo
oo
3
8
I
10
SAMPLE INFORMATION
Bortng No. d-5
Sample Oeplh: 5 '. L '
I
I
_-_-"1
-+a +
)
\
I I
It
I
\
I ,
I
ll
ltI
Page P
I
L
L
0.2 0.3 0.4 0.5
6
7
!lll
il
L
KENNETH G. OSBORNE
& ASSOCIATES
PRESSURE
CONSOLIDATION
///#//(604867
PRESSURE - kiPs Per ft.2
0.1 0,2 0.3 0.4 0.5 1.0 2,0 3.0 4.0 5.0 10.0
0
2
6
7
I
o
10
t
SAMPLE INFORMATION
Boring No. J.5 ,
Sample Deplhi /.t : /a
\\
\
I
,
\
\*
\
Pa ge Q
L
c(,o
o
io
tr
o
=o
o()
KENNETH G. OSBORNE
& ASSOCIATES
DIRECT SHEAR
SUMMARY
#67 ,(60///q
2000
1600
4qc
o
o
a
=E
tu
ah
1 200
800
400
0 400 800 1200 1600 2000
NORMAL LOAD, P.S.F.
SAMPLE INFORMATION
Boring No.
Sample Depth:
TEST INFORMATION
a Undisturbed C) Remolded
Moislure Conl€nt I Saturaled
R€molded Oensily tr 900/0 ol Max
-()
l
)(
q)
IIIIIIIT
llLL
II IIIIIIII
rII
II I IIIIIIIIIII
IIIITTIIrIII
IIIII
I IIII
IIII]IIII]Ilrr llllI]I IIITIIIIIII lIIIIIIII
ltItII
III]IIIIIII IIIIIIIlIIIII]IIIIIIIIIIII
III III
IIIIIIIIIIIII
ITIIII]IIltILrrrtITItrIIIIITIllIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII]ITTIIIII]
E Nalural
E Natural
t_
L
L
Page R
0
KENNETH G. OSBORNE
& ASSOCIATES
DIRECT SHEAR
SUMMARY
K€O#67 tr/s,bz
20c0
+
q.
4
o
oJ
oz
E
UJ
Io
1200
0
0 400 80c 1200 1 6C0 2000
NORMAL LOAD, P,S.F.
SAMPLE INFORMATION
Boring No.
Sample Dsplh:
l
I,|
t
1
1
I
D
1
I
:
I
I
IIIIIIII IITllITI]ITT]III]III]IIII!III]
III II TII rl IIIIIII
]I ITII IIIIIIIrlIIIIIIlIIIIIIIIIIIIIItrIIII It
III]
IIrIrII
If,lIIItrIIIIlIIIIIITI]
ITIIIIII
: Natural
tr Nalural
I
t
L
L
L Page S
1 600
800
TEST INFORMATION
a Undisturbod C Remolded
Moisture Conlenl 8 Saturatsd
Bemolded DGnsity tr 9006 ol Max.
i
t
t
L
L.
SQrz€: /t/= /ao/
Page 1
F4/Ru/€tv
8-/
PA *r/12 3Y z /r4 &zaF
co.1/67ROc,7/AV co,
KENNETH G. OSBOBNE
& ASSOCIATES
BORING
LOCATIONS
\
\
\
R.l
\PRAP4;€D
.y4u474.<€
t/6*1487///.5il
#'
a-+
'2a
a
L
t
L
,l3r\t$l
{l
ill:l
Il
I
I
!
KI,NNI: I I I (i. ()slt()RNI: & .\\\rX l.\ll,S
t
o
DATE
JOB AODFESS CITY T€CHNICIAN PROJECT ENGINEEFI
)GENEFAT CONIFACTOF
PURPOSE OF FILL OF NAIURE OF STAUCTURE TO AE SUPPOFIEO OAIE
GFAOING ON EAATIIWOFK CONTFACIOF ENSITY STANOARO
5 LAYEF cr
rGEN CONIFACIORS SUPT
SOUFCE ANO CLASSIFICATION OF FIT L MATEFIAL WEATHER
TIME CHAFG€D TO PROJEC]
)iIME CAAFGED APPROVED BY
HAULING EOUIPMENTt
SPFIEAOING EqUIPMEN'I
WATEFIING EOUIPMENT GAL lRUCK
COMPACTION EOUIPMENT
TTSEFEOUTPMENr
'uFrrHrcKNEss
T NEFAL OESCRIPTION OF AREA SEINC WOF|(ED. M"IINGS VISIiORS IFENCII \A/IOIHS ANO D€PTHS fOF UIILIIY LINE IESIS ET(
\,
)v
II
I
I
EIEVAIIONS
LOCATION
TEST
COPY SENT TO CLIENI CONIINUED ON NEXT PAGE OF
IIIIIIIIIIIIII
IIrIIII
TIIIII
IIIIIII
DAILY REPORT OF
GRADING CONTROL
! no". tr tr
Vil,Es o Co.
CIV IL ENG IN EE B ING AND SU BV EY ING
WILLIAM F, HAYNES, L,S
(1 928 - 1987)
ROBERT E, STEAFFENS, P E
|.lARCH 23, 1988
CITY OF SANTA ANA
BUILOING DEPARTMENT
206 IIEST FOURTH STREET
SANTA ANA, CA. 92701
L^,*
N
N
U
ATTENTI0N: LEV R0S0VSKY
SUBJECT: CIVIL ENGINEER.S CERTIFICATION OF COMPLIANCE FOR BUILDING PAD
Lr
PROJE CT :GRADING PERMIT NUMBER: 00173
PLAN CHECK NUiIIBER: G1959
J0B ADDRESS: 3220 S. FAIRYIEU
OIINER: I'IAXIE'S INDUSTRIES
GENERAL CONTRACTOR: LAGERLOF CONSTRUCTION
f{0RK BEGAN: 2/27 /88 l,,0RK C0I'IPLETED: 3/21/88
r)
IN ACCORDANCE I,IITH THE CIIY OF SANTA ANA GRADING AND EXCAVATION
CODE AND THE REQUIREMENTS OF THE "U.B.C." I CERTIFY APPROVAL OF THIS
PROJECT, AS OUTLINED ABOVE, TO BUILDING PAO GRADE. GRADING HAS BEEN
COMPLETED IN CONFORMANCE I.IITH THE APPROVEO PRECISE GRADING PLAN FOR
THIS PR0JECT AND IN FULL C0MPLIANCE I'JITH SAI0 C0DES. CERTIFICATI0N
INCLUDES HORIZONTAL AND VERTICAL CONTROL. THIS CERTIFICATION OOES N()T
INCLUDE APPROVAL OF THE PLACEMENT AND COMPACTION OF EARTHWORK WITHIN
THE PURVIEI.I OF OTHERS.
\
^)\
c\
\
DATE: 3lZ3/88
RCE#: 25068 (ExPIRES 12-31-89)
PRES DENT
Lrllllt rltt-+
4
0fc
,
*
R.E F
3829 BIFCH STREET . NEWPOFT BEACH, CA 92660 . IELEPHONE 17 14) A52 A626
BY }l. R. HAYNES & CO.
7r/
I
rB
.qtr
\n
R6
v)
KENNE'I'H G. OSBORNE & ASSO( I,{IES
C]ITYOFSAN?AANA
GRADINGSECTION
APPROVDD
lhie eoil nport & specifications must be kept on Lite 1,
at all times and it is unlarvlul to nrakL. any chlr r.;.- .-,
alterations on samc rlithout wntL'n i,(nljssro,r Iro,l
GRADING SECTION City ofSanta AIa.
The stamping ofthis soil report & specifications SHALL
NOT be held to permit or [x, r,rr upproval ol the vrolvtion
of any provisions of any City oISanL.r Ana Ordinance or
Stale Law.
REVISED SETOF PIANS REQUIRDD
u )'€z
oLD -v/'%^sBy
a.t9.e-?
Date
fi1+u,p
I
I
I
I
I
I
L
KENNETH G. OSBORNE & ASSOCIATES
February L0, 198 9
LagerLof construction
1607-L E. Edinger
santa Ana, california 92705
Attention: ltr. Lagerlof
Subj ect :Final Soils Report
Kleenline Industrial Building
3220 5- Fairview Street
santa Ana, California
Dear l.tr. Lagerlof :
Attached to this letter You wilI
following reports which constitute our
for the subject proj ect.
find copies
Final Soils
of the
Report
L. ceotechnical Report
January 28, 1988.
of Rough Grading dated
2 Interj.or Sewer Trench Density Tests letter dated
April 26, 1,988.
3 on-site Exterior sewer and water trenches
off-Site Exterior conmon Electric and
Trenches letter dated June 20, 1,988.
and on and
Te lephone
4. Subgrade and water Trench Density Testing letter
dated September 20, 1988.
Based on the results of tests presented in these
reports, it is the opinion of this engineer that the
earthrrork, utility trench backfills, and pavement area
preparation have been performed in accordance with the
reconmendations of this firn and the city of Santa Ana
crading ordinance. The site is considered suitable for
support of the structure and improvenents.
Job No. 4871,Page 1
GEOTECHN ICAL E NGIN EERING 17141 MURPHY AVENUE IRVINE. CALIFORN IA 92714 \714) 174-2001
I
I
L
I
I
I
KENNETH G. OSBORNE & ASSOCIATESLagerlof Construction Co.February 1,0, 198 9
The opportunity to be of further service is appreciated
and please do not hesitate to cal.l if we can of additional
service.
Respectfully submitted,
KENNETH G. OSBORNE
JRC : rrk anes R. coleman.8. 229G
oF cAt
++
Job No. 4871
llo. GE 229
txp.6.3l.9l
t
t
I
I
I
Page 2
T
I
KENNETH G. OSBORNE & ASSOCIATES
GEOTECHNICAL REPORT OF ROUGH GRADING
Kleenline IndusErial Building
3220 S. Fairview Street
SanEa Ana, Calif ornia
Cl-ient:Lagerlof Cons truction Co.
1607-L E. Edinger
Santa Ana , CA 92705AttenEion: Mr. Lagerlof
Job No. 4871
January 28, 19 88
GEOTECHNICAL ENGINEERING IRVINE, CALIFORNIA 92714 l7 141 47 a.20o1'| 71i11 MURPHY AVENUE
TABLE OF CONTENTS
Pap,e
INTRODUCTION---------- I
FIELD TESTING AND OBSERVATIONS----------1
2LABORATORY TESTING----
REMARKS AND RECOMMENDATIONS
Footings and Bearing 2
2
J
3
3
J
Concrete Slab Construction-----
Expansion--
Soluble Sulf ates---
Limi t s of ReportinB----------
General
APPENDIX
Table of Test Results---------- A-B
Test Locations-------- C
I
I
I
I
I
Job No. 487 |Page J.
This report presents the results of testlng and
observations made by thls firm during the rouBh grading
perforned on the property located al 3220 S. Falrview Streetj.n the city of Santa Ana, Callfornia.
Planned for construcElon is a slngle t$o-story
of f i.ce/r.,arehouse building which will be of concrete tilt-up
type. The sfructure is to be supporLed on conventiotral
continuous and pad footings with slab-on-grade concrete
f 1oors.
Reference should be made to the Geotechnlcal
Investigation as prepared by this f irm on November 5, 1987.
Please also refer to our Grading Plan Reviev letEer dated
January 21, 1988.
FIELD TESTING AND OBSERVATIONS
As part of the
buildings, and debris
the
clearing opera!1on,all
site.removed froE thewere
for
vege!aEion,
was
the
6 to
bottom of
This area
As preparation
perf ormed:
receiving fi11, the f ollouing was
1. The existing ground in the areas of the bu11ding,
ext.ending a ni.nimun of 5 feet outside the building line' was
undercut Eo a depth of 3 feet below the bottoo of uhe
f oot.ings. The exposed surface was Ehen scarifled and
conpacted to a depth of 6 to 12 inches.
2. The existing ground in the truck well area
undercut to a depth of 3 feet below the boEton of
footings and then scar ified and compacted to a depth of
12 inches.
3. The existing ground in the driveway and parking areas
were scarified and coopacEed to a depth of 10 to 12 inches.
4. Benches were constructed into t.he prevlously placed
f i.11 during the undercut operatinB and as the new fill was
placed.
5. A sofr and weE area
Eruck well area at the
L,as encount.ered in the
completion of grading.
I NTRODUCT I ON
I
I
I
I
I
,
Job No. 487 L Page 2
vt11 need
date.
inspecEion and possible stabilization at a later
The fill was placed in 4 inch lifts and compacted by
rneans of a 5 r x5 | sheepsfoot. roller atEached to a D-6
bul-ldozer and by means of vheelrolling vith loaded scrapers
and a L,ater truck. The required noisture was supplied by a
3500 ga11on vater truck.
The fill naterial consisted of both on-si.te and iEported
so11s. The on-site material consisted of si1ts, sandy si1ts,
silty sands, and sands, vhile the inport consisted of s11ty
sand obtained from three sources.
The denslty of the soils was determined in accordance
rvith A.S.T.M. Test Methods D-1556 and D-2937. The test
results were compared to the naximun density as determined
in accordance with A.S.T.M. Test Method D-1557. The resultsof the tests are presented on the attached "Tab1e of Test
Results" with their approximate locations shown on the
attached plot p1an.
TeSES
conpacted70-')
for
soil
volune change L,i th moisture
in accordance with the
\Jere
UBC
performed on
Test Standard
The naxinun density of
accordance with A.S.T.M. Te st
the soil vas
Method D-1557.
determined in
Ln areas Eo
constructed
The concenEration of soluble sulfates in the soil was
det.ermined by A.S.T.M. Test Method D-516 Method A and is
expressed as a percentage by Ueight of dry soil tested.
REMARKS AND RECOMMENDATIONS
Footings and Bearing
Footings may be designed for an al1ovab1e bearing value
of 1925 pounds per square foot provided they are placed Eo a
Einimum width of 12 inches and a ninimum depth of 18 inches
below the lowest adjacent final grade. Thls value may beincreased by 300 pounds per square foot for each addltioDalfoot in vidth to a oaxinun value of 2825 pounds per square
foot. An increase of 1/3 of the above bearlng value is
permi ssible for shorE duration loadlng.
II iS
be covered
reconmended that coDcrete floor slabs
with troisture sensit.ive coverings be
I
LABORATORY TESTING
Concrete Slab Construction
t
I
Job No. 4871 Page 3
over a 6 rnil plastic membrane. The plastic membrane should
be properly lapped, sealed, and protected vith sand.
It is cautioned that concrete slabs 1n areas to receive
ceranic Eile or other crack sensitive floor coverlngs nust
be desi.gned and constructed to minlmize hairllne cracking.
Expansion
The results of tests indicate that the soils existing
t.he site possess 1ow expansion potential. The results are
f oLlovs:
on
AS
Expanslon
Index
Source
Location
Ma x irnun
Density
121.5Huntington Beach
0so Par kr.,a y
Mission Vie jo
As a result, no
necessary for expansive
14
neg.
is considered
pro j ect.
The soi 1s existing on Ehe site conta j-n a soluble sul fate
content less than 0.20 percent vhich is not considered
detrj.Dental to standard concrete mixes. As a result, no
special ceEenE type or constructlon is considered necessary
for solubLe sulfates for this project.
Limlts of Re orEin
perforned f orof January 7,
the
1988
General
The grad j.ng performed on this site Lras done in an
acceptable manner and in conformance rith the GeoEechnicaL
Investigation. The results of testing indicate thaE the fill
has been compacted go aE least 90 percent of maximuo
density. Based on test results and observations rBade by this
firm, iE is the opinlon of this englneer Ehat Ehis project
is suitable for the constructlon of the KleenIlne Industrial
Butlding.
I
0ptinum
Moisture
L2.2
special constructi.on
so11 purposes on lhis
SoLuble Sulfates
This report covers the grading
lndustrial building between the dates
t.hrough January 25, I988.
t
T
I
T
Job No. 4871 Page 4
Thls reporE is lssued l{ith the understandlng thaE it is
Ehe responslbtlity of the ovner or hls representative t.o
insure that the informatlon and recorornendatlons contained
herein are cal1ed to the attention of the ProjecE Archltect
and Englneer and are incorporated lnLo the plans and
spectfications and that necessary steps are taken to see
that the Contractors and Subcootractors carry out such
reconmendations.
Res bmitted,
KE NE & ASSOCIATES
Ke ne
VGMc F : dhd G.E
I
t
11 v
C
CAL\\
th
lr
APPEN D I X
I
L
TABLE OF TEST RESULTS
RI!4KS
?tesEreES
ttest
re es
Job No.-Ctient 4871 - Laqerlof Location
Tesl Type Code: S = Sand Cone, T = Drive Tube
SanEa Ana
ELEVATIONS FIELD
MOIST
FIELO
DENS,
MAX
DENSTESTNATFG
TEST
NO
o-TE ST
.DIIE.
9i98.9 t9 .2 108.532.0 37.0 38.5 15.3T
ryoot/8
9198.4 79.2 108.5232.O 37.0 38.5 14.6T1/8
93I00.8 10 ,108.53T32.O 37.0 38.5 tu.!t/8
79 .2 108.5 o,T 32.O 37 .0 38.5 t9.7 100.1L1/8
19.2 108.5 9234.0 37.0 38.5 16 .9 100. 25Tr/11
111 .2 9l+34.0 37 .O 38.5 16 .9 105.2 77 .66T7/tr
111.2 88ao <13.3 98 .4 17.67T1/tl ?? q 37.0
93i01.0 t9 .2 108.58T1/11 34.0 37.0 38.5 18.3
93103.6 t7 .6 111.29T7/r1 33.5 37.0 38.5 20 .1
s317 -6 111.210T1/11 34.0 37.0 38. s 19.4 103. 7
9317 .6 111.211r/11 36.5 37 .O 38.5 19.0 103.5
t7 .6 111.2 9312Tt /71 36.5 37.0 38.5 20.8 103.3
t9 .2 108.5 9313Tt/rr 36 .5 37.0 38.5 19.0 100.8
77 .6 111.2 937LTt/Ll 36.5 37.0 38.5 18.0 103.8
77 .6 111.2 9315Tt/tt 37 .O 37.0 38.5 702.9
l7 .6 111.2 o?16 T 1/ tt 36.0 37.0 'lo <79 .7 102 .0
106.8 77 .6 11i.2 96l1Tt/t2 36.7 38.5 17 .6
9418Tr/12 34.5 36.7 38.5 t4.9 105.6 r7.6 111.2
111.2 9319Tt /72 36.0 37.0 38.5 20. 1 r03.6 t7 .6
20 T 36.0 37.0 18.7 103.2 77 ,6 111.2 93t/L2
2T T 37.0 37.0 38.5 16.9 100.2 77 .6 111.2 901/12
9222T| / t2 1t -u 37.0 38.5 19 .4 102.8 t7.6 111.2
t7t -2 95)1 T 1/12 37.0 37.0 38.5 16.6 106.1 t7.6
77 .6 111.2 93t4r/t2 J4. U 36.0 38.5 ,1 ')toz.9
25 T t/72 34 .0 37 .O 38.5 t9 .4 I n? o 77 .6 111.2 93
9itoT7/r3 36.0 36.5 38. s 14.9 109.9 72.2 121.5
T 12t.5 9327L/13 36.0 36.5 38.5 74.3 I12.8 72.2
28 T 1/73 35.0 36.5 38.5 14.6 113.3 t2 .2 121.5 93
29 T 7 / 13 35.0 38.5 13.0 113.9 11 ')t2t .5 94
30 T 1 / 13 36.5 36.0 38. s 13.3 i13.5 r2.2 127 .5 93
7 /17 37 -O 36 - 531T 38.5 12 .4 1I3.8 12.2 t27.5 94
7)T 1/1t 77 -\i6 - 5 i8 - 5 'li-5 11i-0 72.2 t21 .5 93
33 T t/r4 37 .5 36.5 38.5 14.0 11I.8 t2.2 t2t.5 92
Technician - Karl Zinme rnan
KENNETH G OSDORNE C, ASSOCIATES
MAX
OPT
MOIST,
1
20. 1
I
I
I
I
Page A
KENNEIH G OSBORNE C' ASSOCIATES
TABLE OF TEST RESULTS
RMKS
Job No..611"n, 4871 - Lagerlof Location
Test Type Code: S = Sand Cone, T = Orive Tube
Kar 1 Zinne rman
ELEVATIONS
MAX
OPT
MOIST
MAX
DENSFG
FIELD
MOISI
FIELD
DE NSTESTNAT
o-
F
TEST
DATE
121.5 9311.7 113.0 t2 .236. s 36.534T
r966t/r4
121.5 97t2.7 111 .8 tz.235.5 36. s 38.535Tr/r4
t2t .5 9377.7 ttz .5 t2.235.5 36.0 38.5JOTL /t5
121.5 9313.3 ttz .6 t2.235. s 36.0 38.511Tt/15
111.2 9316.3 103 .6 t7.633.5 37.038L/rs
111.2 92101.6 t7 .633.5 37 .O 34.5 t6.939Tt/Ls
110.5 o')16.538.5 15.9 1o2.240S1/2s 38.5
94110.538.5 13. 6 103 .9 16.54lSr/2s 38.5
9017.6 11I.234.5 19.7 100.0l+2 3/+.5Sr/2s
I
Tech n ician
I
TE ST
No.
38.5
34.5T
I
I
I
L
I
Santa Ana
Abdullah MisklnYar Page B
I
t
I
I
I
I
I
t
t
I
I
t
t
I
I
T
I
I
I
KENNETE G. OSBORNE & ASSOCIATES
TEST LOCATIONS
D'TE
,..zr.ga to--o."a&fu^.
n.c.E. ,a310
JOA NO,
4U7/
29
.+l
t,
37
?oh
2+
v5,)a
eb
+
a
,
"+ZD
./o
tZ .2t
b oZ9
t?
5
17.
o l(o
24
'7
9'27
ol8
.rz
tS Z(P
9220 5. ,4/.Q ?/€.,1/
t
a
so.7 /
$
N
N
\
\
$
,\
\
$
vt
\t
\)
\$
h
\
//PAI
b
N
\
\
N
\
\
e2
zz-*.12,/3 a1-
1a44.P47-42
64422//G
,e?aPasa
.r7:.,?/€741r
-2
o/-.?Z-.{s/rt/ 7'157-
,4e-AA<a -rrZP Af
w..<. .?, y44 / €e.
.944€: ,/'/: /42.
Page C
I
I
77a€< W64.
I
(
,
I
KENNETH G. OSBORNE &ASSOCIATES
April 26, 1988
Lagerof Construction Conpany
1607 East Ed inger
Santa Ana, California 92705
Ref erence:Interior Sewer Trench Density Tests
KIeenline fndustrial Bullding
3220 S. Fairvien Street
Santa Ana , Calif ornia
Dear Hr. Lagerlof :
This letter presents the results ofperformed by this f j.rm for the backfill
serder trench at the referenced project.
density testinS
of the interior
The
depth.
trench.
interior seuer
0ur Eests are
trench
liEi.ted
uas about
to the upper
three feet
1.5 feet of
in
the
' The density of the soil vas deternined in accordance
vith A.S.T.M. Test MeEhod D-2937. The results Here conpared
to the naxinum density as deterEined in accordance vith
A.S.T.M. Test l,lethod D-1557. The results are presented on
the attached "Tab1e of Test Resultsrr vith the approxinate
test locatr.ons shovn on the attached plot p1an.
The results of Eesting indicaEe that the above
referenced backfill have been conpacted to at least 90
percent of naxlnum density.
--.-.-.-\Respec Af'u11y cu\it ted,
\
KENNETH G, OSBORNE\& ASSOCIATES
YGM:ed
Job No. 4871
GEOTECHN ICAL ENGIN EERING 17141 MURPHY AVENU E
G. 0sbor
IRVINE, CALIFORN IA 92714 (7141471-2001
Kennet
G.E. 6
Attention: Mr. Lagerlof
J-./
-1?rzr.+
Alll
I
I
I
i
I
ir
F.::ET\.INIE-TH G -TABL E
OSECRT{EOF TEST
ININIfi SEH
Et ASSCf E I A-f ES
RE S ff f-:t's
ESI IYPT EST}{]. mE LETiilr
ELEVAT I trNs
TEST I&IIfiA, FIH.
FIR.O FISI)
nliI. Do6.
rTl ,l r$I
mrs]. Ds6,MAX REStrS
1S T l/lifi
T UllS
-q8.5 91
97
lqr,0
r0{,0
19.7 100.1
105.1
l6,5 110.5 9l
110,5 95x
JOB NO. 487 1
TEST TYPE CODE:
CL 1 EI.IT :
S=SAND CONE.
Laqerlof ConstrLrction LOCATION: Santa Ana
T= DRIVE TUBE TECHNICIAN: - J. Malcom
i
t
I
0
D
t
+
\
U
t
\-
U
$
{
\l
N\
a
h
\
s
U
\
$
a
t..\
N
$(
\)
\l
N
N
\
\
N
\
.1€-A<A!€ /U/rP 8f
t{.?. 4,,r rt'Y15 / 'o'
o/S - //vr-a?/e< 5dt(€< 2*7/ 7€g-
NZ-
L-,_ __
25
v
N
.\)
d
N
b
$
\J
h
t
$
\
l5
KENNETE G. OSBORNE & ASSOCIATES
TEST LOC ATIONS
A7p.o'.c@pEl
ZZ4Et
EEI
EDZ'ZTZAGZEA@1e@ z
S;C4z€: /4=/aO'
June 20, 1988
Lagerlof construction co.
1609-L East Edinger
santa Ana, california 92705
Attention: Mr. Lagerlof
subj ect :Geotechnical Testing for
on-site Exterior Se$rer and water Trenches
and on and off-Site Exterior Conmon Electric
and Telephone Trenches
Xleen1ine Industrial Building
3220 South Fairview street
Santa Ana, cal i fornia
Dear 1,1r. Lagerlof :
This letter presents the results of density testing
perforrned by this firm in the backfill of the on-site
exterior se\^rer and water trenches and in the backfill of the
on and off-site exterior conmon etectric and telephone
trenches at the subject project. Please refer to our letter
dated April 26, 1,988 for prior interior sewer trench density
tests .
The sewer trench was reported to be 4 feet in depth. our
tests are linited to the upper 2 feet of the trench.
The water trench was reported
our tests are lirnited to the upper one
be
feet
to be 2 feet in depth.
foot of the trench.
The
3.5
of
conmon electric and telephone trench r.ras reported to
feet in depth. our tests are limited to the upper 1,.5
the trench.
The density of the soil was determined in accordance
with A.s.T.l,t. Test uethod D-2937. The results were compared
to the maxj,mum density as deterrnined in accordance with
A.S.T.l,t. Test llethod D-1.557. The results are presented on
the attached I'TabIe of Test Resultsrt with the approximate
test Locations shown on the attached plot plan.
Page 1
GEOTECHN ICAL ENGIN EERING 17141 MURPHY AVENUE 1.714) 474.2001
il
KENNETH G. OSBORNE & ASSOCIATES
Job No. 4871.
I
lr IBVINE. CALIFORN IA 92714
KENNETH G. OSBORNE & ASSOCIATES
Lagerlof construction
The results of testing indicate that the on-site sewer,
water, and conmon electric and telephone trenches have been
compacted to at least 90 percent of rnaximum density.
The northern or off-site end of the connon electric and
telephone trench did not neet the minimum 90 percent Baximum
density reguirenent.
.1=
Res tfu lIy subnitted,
G. OSBORNE & ASSOCIATES
VGM: rrk Ke
G.
. osborne
E
Job No. 4871 Page 2
I
June 20, 1988
I
l,
t
I
I
I
I
I
t
I
I
I
I
I
I
I
I
I
I
I
I
I
F:.E]\INIE'I-H T= - T]SBff FT{E
TABI-E OF TEST 8t ASSOC r A-[ES
R,EST,]I.,TS
COMMC)N ELECTITIC & TELEPHC)NE TRENCI{
IESI ,'YPE IEST
M. MIE l0lll iS,J
ELE!/AT I OI.JS
ITSI ilATlfIL FIIIfl.
TIE.O FIA..D
il1151, [)E.6.
gi;rui mI
r{tst.086
./-
MA X REER(s
1
T 6/l!/S
T o/15/B
1b!15t8
T 6/l:/ts
N.E SrdE
Si SidP
100.0
100.0
qqe
I r'a l
90.:
111, ? 86
ir! ! q,
ll1.? 81 lPtPst 11
.ifrE lnll " 4Li7 1 - ,:il- I EllT: L.ager ! o+ Ccln--trLtc trori
TECHNICIAN:
TEST TYPE CODE: S=SAND CONE, T= DRIVE TUBE
i, !!Hl Ifil.lt Santa J-,',:,
Abdullah Misklnyar
I
T
t1 L
i /.6
1;.5
l7.6
F.:,ENlFlE=-l-H t5 - L]SEOF:I{E E1 ASSOC I A-f ES
TABI-E ()F TEST RESf'I-'TS
WATEI.T & SEWEIi
EsI n?E IEST
IS, MIE
ELEUA'i i DNS
EST t*Trfi[- FUH.
FIA.D F]S-D
mtsl. Do6.
OPTIIT'I IIAI
t'IcT tErq
-/-
HA il RB*f,rS
It 1 6/9/B 8.0 ffi.o 100,0 17.6 103.6 16.l ll3.8 91
ls T a/9/88 9-q.0 %.r.' 1frJ,0 16.9 t02,6 16.1 lr3,g 90
JOE f,lfi . 4A7 1 - CL.IE.i'lT: Sinta Ana LOCAIIETI'I! Santa Ana
TECHNICIAN: Kevin Peyton
TEST TYPE CODE: S=SAND CONE, ?= DRIVE TUBE
I
I
I
li
t
I
I
I
t
I
t
I
I
I
t
t
I
I
I
I
I
t
I
KENNETE G. OSBORNE & ASSOCTATES
TEST LOCATIONS
@14oo.or"
6-2o #1 ",.c E. /4310
.t{ A/o.
4t 7/
,.7?//<l//€t( .574€17
N
q
\,
\
\,
t
&
l4 2Z It
IL
lt
I -rc-5
\
t
N\t,$
tJ' I
$
\,
\
$
e
t
\
N
N!
\
ol5 - 5al?€.1 2€.1/5/ 7Y -47'
./W - ttL/rrA? 21-1/-5r'at/ 457-
./€ - €a.(za/ €d€/-?/€ / zZ:ce+euc
e4-;.* TTSZ-
u
N
v)
il
$
\(\'
u
\
SE4z€.'//=/aa'
I
KENNETH G. OSBORNE & ASSOCIATES
Lagerlof construction
1509-L East Edinger
Santa Ana, Cal ifornia
backfill ing
and as such,
Co.
92'105
of the waterthe backfill ing
Attention: ur. Dave Lagerlof
Subj ect :Subgrade and water Trench Density Testing
KIeenline Industrial Building
3220 south Fairview Street
Santa Ana, CaI ifornia
Dear Mr. Lagerlof:
This letter presents the results of density testing and
inspection perforrned by this fj.nn for the subgrade and the
backfill of the exterior water trench of the above
referenced proj ect.
The uater trench was reportedly 3.5 feet in depth with
no shading. Backfill material was native silty sand with a
trace of clay which was placed in a 3.5 foot Iift.
compaction was obtained by rneans of a hydraulic harnrner and
moisture was supplied by a water hose.
The subgrade for paving consisted of imported sandy silt
placed in 6 to 10 inch lifts. The lifts qrere compacted by
means of a loaded D860A scraper and a 545A loader. The
required moisture lras supplied by a 1500 gallon water truck.
The density of the soil was determined in accordance
with A.S.T.M. Test Method D-2937. The results qtere compared
to the maxirnum dens j,ty as determined in accordance with
A.S.T.M. Test Method D-L557 for the subgrade. The results
are presented on the attached "Table of Test Resultstt \./ith
the approxirnate test Locations shown on the rrTest Locationsrl
p1an.
The
test ing
trench was
operat i ons
done
were
prior to
not
Job No. 4871 Page 1
17141 MUBPHY AVENUE IBVIN E, CALIFORN IA 92714 \711) 474.2001GEOTECH NICAL ENGIN EERING
I
September 20, 1,988
I
KENNETH G. OSBORNE & ASSOCIATES
Iagerlof construction co.Page 2
observed by this firm. our opinions concernj.ng this area are
based on the assunption that aII fill is represented by the
results of density tests taken at randon. Holrever, no
lrarranty is offered or should be inplied as to the adequacy
of areas not tested.
The results of testing and inspection indicate that the
above referenced soils have been coDpacted to at least 90
percent of maxinum density for the subgrade.
RespectfulLy subnitted,
KENNETH G. OSBORNE S
(
RT : JRC: rrk mes R. colemanE. 229
Job No. 4871,Page 2
I
&p.6.31.91
RS
['
FiEt{N.!E-rH G -TABLE
f]5ETClR]\-IEC)F TEST
IAIB
Et ASSOC I A-I-ESREST,'LTS
ESi t-l!! lESirrr rEi;
EL EI"'AT ] DI.]S
;EST I$TIFTL FIIA,
Fts.! FiE-0
I'l_: l'T ,lc!a
SF.IIP; IiAI
II.ICT nlrJl f,tAx REstrs
I rlX./8! iASi SiDE1 UZIA E,',mEflEi!i allta :€a1 atta
; I.'IIAE lt S:!i
aal
::
J! ;
17,1
!q I
t,1 a
t7 L
iil.: :1
\!t,2 9:
:t!: q:
-. -. I rlt';' I
S=SAND CONE,
ii]'iiERLDF
T= DRIVE TUBE
r.-rl:-; il:1"'1 :
TECHNICIAN: CTEST TYFE CODE:D I'1U T
I
t
KENNETH GTABL E
C)SBC)I.?NE & ASSOCIATES
C)F TEST RESt]I.TS
lEi;.qE
lii.
i)?! i:!i
iit!r!-,::t n:Nl rl:lti :,4!i .j,1 " F:r.ur'l
.n - nD T ltE. 'nilDF T!Ci{NICIAN: C
: -.r -
RLT!LTIST TIPE CODE: S=SAND COliE.
I
l'
I
I
I
T
T
T
!
!
I
T
I
T
I
I
T
I
I
I
I
KENNEIE G. OSBORNE & ASSOCIATES
TEST LOCATIONS
w497/
cra Te
oo9 Aoo-o-.o&,.-,
A.c.z. /at10
il{$
t
U
t
U
I
$r
Iu
0
it
I
It*l
L w
z*
\
3t(
,Ul
I <
4vl
+5a
' l* Sarcro4a€ D€/rtgrr 1457
tt/rf€R 77€tt,/ E{gg "Arlut
RaFaR&€ ,HrP ar
MR. //if-/a5 / aa.
(\ z-
I
I
I
I
I
I
.qe,r?z€: /r=/@'