Loading...
HomeMy WebLinkAbout1525 W Marion Way - REV2 - Plan:: ROOF NOTE SCHEDULE :: (N) DOWNSPOUT; TYP. (N) GUTTER; MATCH (E) STYLE; TYP. GUTTER SLOPE DIRECTION; TYP. VULCAN VENT VE3514 TABBED EAVE VENT USED WITH EVERKEM FIRE CAULKING ICC- ESL:1300; TYP. ASPHALT SHINGLE - CLASS A FIRE RESISTANCE. TRUDEFINITION DURATION COOL SHINGLES COLOR MOUNTAINSIDE (OR SIMILAR). PRI ER- 1378E01 INTAKE VENTILATION TO BE GAF COBRA INTAKE PRO (OR SIMILAR) INSTALL PER MANFU. SPECS ROOF VENTILATION EXHAUST TO BE GAF IR65 PLASTIC SLANT - BACK (OR SIMILAR) INSTALLED BASED ON MANF. SPECS AND IN POSITION NOTED ON PLAN IMAGINARY PROPERTY SEPARATION LINE. 11 22 33 44 55 66 77 88 11 22 33 44 55 66 77 88 5 : 12 5 : 12 5 : 12 P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L 5 : 12 5 : 12 5 : 12 5 : 12 5 : 125 : 12 5 : 125 : 12 1 : 12 8' 96" MAIN RESIDENCE 2314 SPRUCE ST (E) GARAGE 2314 SPRUCE ST 22 P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L P / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L SB / L 5 : 12 5 : 12 5 : 12 5 : 12 5 : 12 5 : 12 5 : 12 5 : 12 5 : 12 5 : 12 5 : 12 5 : 12 5 : 125 : 12 1 : 12 5 : 12 12.5'18.5'19' 18'-8" 224" 6' 72" 4' 48" 1' 12" 17'-3" 207" 1' 12" 13.68' 25.22' 10' 8' 10' 5'5' 6' 15' CL 14'-4 1/2" 173" 11'-3 3/4" 136" 3' 5' 2' 2' 1' 2' 11223344 MAIN RESIDENCE 2314 SPRUCE ST (N) ADU 1525 W. MARION WAY 55 66 7777 55 88 11 22 88 22 11 11 0 1 5 10 Scale: 3/16"=1' 2 3 4 20 0 1 5 10 Scale: 3/16"=1' 2 3 4 20 ROOFING MEMBRANE 2x WOOD RAFTERS VENTED AIRSPACE BAFFLE VAPOR BARRIER FINISH SIDING FINISH ROOFING EAVE BLOCKING w/ FIRE VENT SEE MANUF. SHEATHING INSULATION FLASHING RIDGE BOARD (drilled or notched) 5/8 Gyp. Type X 1/2 in OSB 3/4" STUCCO FINISH 1-SI DDED LP FLAMEBLOCK 2 LAYERS WATER RESISTANT BARRIER; 30LB FELT MIN. DECK-TO-WALL METAL FLASHINNG BUILDING PAPER LAPPED IN WEATHERBOARD FASHI ON. LAP OVER FLEXI BLE FLASHING AT HEAD. LATH AND PLASTER 5/8" GYP. TYPE X ON I NTERIOR SIDE OF WALL REVISION TABLE # DATE REVISED BY DESCRIPTION 1 2/22/2025 KDS OWNER REQUEST 2 7/28/2025 KDS INSPECTION REV GENERAL NOTES 3/16" = 1' 1.Dimensions are for initial building estimates only. It is the responsibility of the Contractor to field verify the dimensions before any construction begins. 2.(E) GUTTER AND DOWNSPOUT TO REMAIN; REPAIR AS NECESSARY 3.ROOF SLOPE IS 5:12 UNO 4.(N) Roof to match (E) in style, color, and orientation. 5.(N) Roof eave over hang is 12in UNO Current File located at: G:/Shared drives/Work Drive/1 - Clients/2023/111 Green Bay Construction 111/GB2305_ADU_Spruce/10-Chief Architect/GB2305_ADU_Spruce.layout ATTI C SF to VENTILATION SF = 150:1 PROPOSED ATTIC* SF = 565 REQUIRED VENTILATION = 272square inches of intake+exhaust Ventilation intake to be: Fire rated Vulcan Vents VE3514 Ventilation exhaust to be: Master Flow IR65 :: ROOF VENTILATION :: :: CALCULATIONS :: Existing Roof Plan1 Proposed Roof Plan1 EXISTING ROOF PLAN 1 1HR FIRE RATED EXPOSED RAFTERS 2 1HR FIRE EXTERIOR WALL - U348 22 22 WALLS LESS THAN 5 FEET FROM PROPERTY LINES, REAL OR IMAGINARY, SHALL COMPLY WITH DETAIL 2/A101; EAVE OVERHANGS LESS THAN 5 FEET FROM PROPERTY LINES, REAL OR IMAGINARY, SHALL COMPLY WITH DETAIL 1/A101 GARAGE CONVERSION SHEET: SCALE: :: DRAWINGS PROVIDED BY :: Kurt D Snyder Green Bay Remodeling 1 9 4 9 3 7 8 3 3 5 8 1525 W MARION WAY SANTA ANA, CA 92706 DATE: 4/9/2026 A 1 0 1 D03D03 D06D06 W05W05 D01D01 W01W01 D04D04 D07D07 3068 W02W02 D02D02 W04W04 D05D05 21068 4040LS 4040LS 6068 W03W03 W03W03 D03D03 110V 110V 110V 110V 110V 110V 110V 110V 110V 110 V 110V 110V C / W C / W C / W S S S S S S S S 30X22 ATTIC ACCESS 30X22 ATTIC ACCESS 110V R4 GFCI DM DM DM DM R4 R4 GFCI GFCI GFCI GFCI GFCI H VS R4 R4R4 R4 R4 R4 R4 R4 DM DM R4 R4 R4 R4 R4 R4 DW GD HV R RA GFCI DM DM DM CO/SD CO/SD EP CO/SD 1 A102 1 A102 2 A102 2 A102 2 A102 2 A102 3 A102 3 A102 3 A102 3 A102 1 A103 1 A103 3 A103 3 A103 4 A103 4 A103 5 A103 5 A103 9'-2" 6'-9 1/2" 6'-10" 2'-1 1/2" 10'-6" 8'-9 1/2" 1'-10" 3'-7" 2'-1" 5'-6"10'-5" 37'-6" 17'-3" 6'-0 1/2" 3' 2'-4" 12'-7" 2'-4" 3'-3 1/2" 2'-6" 12'-8" 18'-6" 2'-1 1/2" 3' 3' 3' 9'-3" 3 1/2" 12'-3 1/2" 60" 33" 24" 30" 36"21"18" 69"18" 3" 25"43"22" 12"9" 149 3/4" 43" 131" 37'-6" 10'-5" X 13'-0" 125 SQ FT 16'-4" X 9'-2" 148 SQ FT 5'-6" X 10'-6" 58 SQ FT 16'-4" X 16'-1" 245 SQ FT LIVING KITCHEN/DINNING BEDROOM BATH 11 22 33 44 33 55 66 77 88 2% 99 1-1/2" 1-1/2" 1-1/2" 1010 37' 6" 11 80" 72 15/16" 152 15/16" 8' R-38, typ. for attic R-19, typ. for exterior walls 80" 72 15/16" 152 15/16" 8' R-38, typ. for attic R-19, typ. for exterior walls R-38, typ. for Attic R-19, typ. for exterior walls R-38, typ. for Attic R-19, typ. for exterior walls 7'-10 1/2" R-19, typ. for exterior walls7'-10 1/2" R-19, typ. for exterior walls :: FLOOR PLAN NOTE SCHEDULE :: SMALL EFFICIENCY LAUNDRY CENTER TANKLESS W.H. PER T-24 FLOORING TBD BATHROOM FLOORING TBD CURBLESS SHOWER ENTRY ENTRY DOOR; DOORBELL BUTTON SHALL NOT BE INSTALLED MORE THAN 48" ABOVE EXTERIOR FLOOR OR LANDING. (N) AC CONDENSER ALL INTERIOR WALLS TO BE REINFORCED ACCORDING TO THE AGING-IN-PLACE PROVISIONS OUTLINED IN 2022 CRC 327.1.1 NO GAS HOOK UP AT STOVE. REINFORCEMENT MUST BE INSTALLED IN AT LEAST ONE BATHROOM ON THE ENTRY LEVEL OR, IF NONE, ON THE SECOND OR THIRD FLOOR, USING SOLID LUMBER OR EQUIVALENT MATERIALS NO LESS THAN 2 BY 8 INCHES (NOMINAL SIZE). REINFORCEMENT SHOULD BE LOCATED 32 TO 39 1/4 INCHES ABOVE THE FLOOR, INSTALLED ON CALLED OUT WALLS FOR WATER CLOSETS, SHOWERS, AND BATHTUBS AS DETAILED. 11 22 33 44 55 66 77 88 99 1010 11 22 33 44 55 66 77 88 99 1010 WALL SCHEDULE WALL TYPE(S) (N) INTERIOR-4 (N) STUCCO-4 (E) STUCCO-4 (E) STUCCO-4, SHORT REVISION TABLE # DATE REVISED BY DESCRIPTION 1 2/22/2025 KDS OWNER REQUEST 2 7/28/2025 KDS INSPECTION REV 3/8" = 1' KEY NOTES GENERAL NOTES LEGEND 1.Dimensions are for initial building estimates only. It is the responsibility of the Contractor to field verify the dimensions before any construction begins. 2.(E) GUTTER AND DOWNSPOUT TO REMAIN; REPAIR AS NECESSARY 3.ROOF SLOPE IS 5:12 UNO 4.(N) Door and Windows are called out with the associated tags. (E) Doors and Windows are shown only as their (E) sizes BATH 1 =150SF LIGHT = 6SF (4%) VENTILATION = 3SF (2%) BEDROOM =116SF LI GHT = 53SF (45%) VENTILATION = 27SF (23%) KITCHEN/LI VING =205SF LI GHT = 49SF (23%) VENTILATION = 25SF (12%) MAN CAVE =156SF LI GHT = 65SF (41%) VENTILATION = 33SF (20%) :: ROOM LIGHT+VENT :: :: CALCULATIONS :: Current File located at: G:/Shared drives/Work Drive/1 - Clients/2023/111 Green Bay Construction 111/GB2305_ADU_Spruce/10-Chief Architect/GB2305_ADU_Spruce.layout PROPOSED FLOOR PLAN - Option 0041 Building Section1 Building Section2 Building Section3 PROPOSED FLOOR PLAN :: COMMON AREA :: KITCHEN/LI VING =213SF :: PRIVATE AREA :: MAN CAVE = 148SF BATH = 58SF BEDROOM = 125SF :: COMMON TO PRIVATE RATIO CALCULATION :: 213SF / 532SF =40.004% :: LIVING AREA CALC :: PROPOSED FLOOR PLAN 11 11 GARAGE CONVERSION SHEET: SCALE: :: DRAWINGS PROVIDED BY :: Kurt D Snyder Green Bay Remodeling 1 9 4 9 3 7 8 3 3 5 8 1525 W MARION WAY SANTA ANA, CA 92706 DATE: 4/9/2026 A 1 0 2 2020LS 3036LS D06D063068 8' 4" 12'-8 1/2" 13'-0 1/2" 6'-8" 14'-10" 4" 5'3' 11 22 33 2020LS D06D063068 3036LS 8' 4" 12'-8 1/2" 13'-0 1/2" 6'-8" 14'-10" 4" 5'3' 11 22 33 2020LS 3036LS D06D063068 W03W03 W03W03 210683068 4040LS 2830LS 2'-8" 11 22 2'-8" 11 22W03W03 W03W03 210683068 4040LS 2830LS W05W05W04W04 7'-0 1/2" 6'-8"13'-0 1/2" 7'-0 1/2" 6'-8"13'-0 1/2" W05W05W04W04 D02D02 D04D04 W01W01W02W02 11 22 44 11 22 44 D02D02 D04D04 W01W01W02W02 :: ELEVATION NOTE SCHEDULE :: (N) TRIM TO MATCH (E) WINDOWS AND DOORS ALL (N) FINISHED MATERIALS TO MATCH (E) RESIDENCE IN COLOR, STYLE, ORIENTATION, AND TEXTURE. IMAGINARY PROPERTY LING (IPL) WALL SURFACE = 300SF FENESTRATION = 50SF PERCENTAGE = 17% 11 22 33 44 11 22 33 44 210686068 4040LS 4040LS 210686068 4040LS 4040LS WALL AREA 357SF FENESTRATION AREA 90SF RATIO 25.4% WALL AREA 357SF FENESTRATION AREA 90SF RATIO 25.4% REVISION TABLE # DATE REVISED BY DESCRIPTION 1 2/22/2025 KDS OWNER REQUEST 2 7/28/2025 KDS INSPECTION REV Current File located at: G:/Shared drives/Work Drive/1 - Clients/2023/111 Green Bay Construction 111/GB2305_ADU_Spruce/10-Chief Architect/GB2305_ADU_Spruce.layout 3/16" = 1' Front Elevation1 Rear Elevation2 Left Elevations3 Right Elevations4 KEY NOTES GENERAL NOTES 1.Dimensions are for initial building estimates only. It is the responsibility of the Contractor to field verify the dimensions before any construction begins. 2.(E) GUTTER AND DOWNSPOUT TO REMAIN; REPAIR AS NECESSARY 3.ROOF SLOPE IS 5:12 UNO 4.(N) Door and Windows are called out with the associated tags. (E) Doors and Windows are shown only as their (E) sizes GENERAL NOTES AREA OF WORK BUILDING SECTIONS + ELEVATIONS TYP. EXTERIOR FINISHASCALE: NTS 11 11 22 22 5 (E) Residence Elevation - Opposite ADU 4 - Right Elevation GARAGE CONVERSION SHEET: SCALE: :: DRAWINGS PROVIDED BY :: Kurt D Snyder Green Bay Remodeling 1 9 4 9 3 7 8 3 3 5 8 1525 W MARION WAY SANTA ANA, CA 92706 DATE: 4/9/2026 A 1 0 3