Loading...
HomeMy WebLinkAbout2150 & 2160 E Fourth St-Solar - Plan (2)TRACT NO. ---- SANTA ANA, CA Design Criteria: 10/31/2025 MASTER ROOFING SOLUTIONS. Attn.: To Whom It May Concern re job: PLAN BLDG A1 & BLDG A2 The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All mounting equipment shall be designed and installed per manufacturer's approved installation specifications. Code 2022 California Building Code (ASCE 7-16) Risk category II Wind Load (component and Cladding) Dr 10 psf V 95 mph DPV Exposure C Lr Roof Dead Load PV Dead Load Roof Live Load Ground Snow S 3 psf 20 psf 4 psf Signed-10/31/2025 EXP. 09/30/2026 2 of 5 Roof Properties: Roof Type = Roof Pitch (deg) = Mean Roof Height (ft) = Attachment Trib Width (ft) = Attachment Spacing (ft) = Framing Type = Framing Size = Framing OC Spacing (in.) = Section Thickness, b (in.) = Section Depth, d (in.) = Section Modulus, Sx (in.^3) = Moment of Inertia, Ix (in.^4) = Framing Span (ft) = Deflection Limit D+L (in.) = Deflection Limit S or W (in.) = Framing Upgrade = Sister Size = Wood Species = Wood Fb (psi) = Wood Fv (psi) = Wood E (psi) = CD (Wind) = CD (Snow) = CM = Ct = CL = Ci = CF = Cfu = Cr = F'b_wind (psi) = F'b_snow (psi) = F'v_wind (psi) = F'v_snow (psi) = M_allowable_wind (lb-ft) = M_allowable_snow (lb-ft) = V_allowable_wind (lbs) = V_allowable_snow (lbs) = E' (psi) = 12 2.4 1.60 Adequate NA DF #2 900 180 1600000 1.6 1.15 1.0 1.3 1.00 1.15 2153 1547 288 207 1357 975 1584 1139 1600000 1.5 3.4 5.6 20.6 4 Trusses 2x4 24 13 3.25 Comp. Shingle 2,4 Roof Signed-10/31/2025 EXP. 09/30/2026 3 of 5 Wind Load Cont. 95 mph C 1.0 0.96 0.83 0.87 ASCE 7-16 Figure 26.5-1B ASCE 7-16 Sec 26.8.2 ASCE 7-16 Table 26.10-1 ASCE 7-16 Table 26.6-1 ASCE 7-16 Table 26.9-1 25.66 psf 4.0 Degrees 1.5 Conservatively assuming all exposed 0.8 conservatively assuming 10 ft2 effective area Uplift (W)Zone(1) Zone(2r) Zone(2e)Zone(3) Fig. 30-3-2 -2.1 -2.6 -2.7 -2.7 Eq. 29.4-7 -48.73 -42.39 -41.42 -39.83 0.3 Figure 30.3-2 GCp= P=qh(GCp)(γE)(γa)= GCp= P=qh(GCp)(γE)(γa)=7.32 Equation 29.4-7 Trusses Attachments: 0.6D+0.6W (CD=1.6) Connection Check Attachment max. spacing=4 ft 5/16" x 4 1/2": 2 1/2" LAG SCREW Withdrawal Value=269 lbs/in 2.5 in Table 12.2A - NDS DFL Assumed Prying Coefficient Allowable Capacity= Zone Trib Width Area (ft) 1.4 750 lbs Uplift (lbs)Down (lbs) Zone(1)4 11.0 85.6 Zone(2r)4 11.0 Zone(2e)4 11.0 Zone(3)4 11.0 85.6 85.6 85.6 Conservative Max= 156.3 227.4 242.8 138.8 <750 CONNECTION IS OK Risk Category = V= Exposure = KZt = KZ = 1. Pv seismic dead weight is negligible to result in significant seismic uplift, therefore the wind uplift governs 2. Embedment is measured from the top of the framing member to the tapered tip of a lag screw. Embedment in sheading or other material does not count. II Kd = Ke = qh= 0.00256KzKztKdKeV2= Pitch = γE= γa= Lag Screw Penetration 217.6 4 of 5 Vertical Load Resisting System Design Roof Framing Trusses Snow Load Fully Exposed pg=4 psf Ct =1.1 Ce =0.9 Is =1.0 pf = 3 psf pfmin. = 3.2 psf ps = 1 psf Conservatively (Cs=1)5.5 plf Max Length, L = 8.0 ft (Truss maximum Allowable Horizontal Span) 24 in 10 psf 20 plf Tributary Width, WT = Dr = PvDL =3 psf 12 plf Load Case: DL+0.75(0.6W+S) 0.75(Pnet+Ps)+ Ppvcos(θ)+PDL=41 plf Mdown=328 lb-ft 975 lb-ft >258 lb-ft OKMallowable = Sx x Fb' (wind)= Load Case: DL+S Ps+ Ppvcos(θ)+PDL=38 plf Mdown=306 lb-ft 975 lb-ft >281 lb-ft OKMallowable = Sx x Fb' (wind)= Load Case: DL+0.6W Pnet+ Ppvcos(θ)+PDL=37.7 plf Max Moment, Mu=302 lb-ft Mallowable = Sx x Fb' (wind)=1357 lb-ft >273 lb-ft OK Pv max Shear=85.6 lbs 247 lbsShear, Vu=wL/2+Pv Point Load = Max Shear, Vu=wL/2+Pv Point Load = 219 lb Member Capacity DF-L No.2 2X4 CL CF Ci Cr KF φ λ Fb =900 psi 1.0 1.3 1.0 1.15 2.54 0.85 0.8 1346 psi Fv =180 psi N/A N/A 1.0 N/A 2.88 0.75 0.8 180 psi E =1600000 psi N/A N/A 1.0 N/A N/A N/A N/A 1600000 psi Emin =580000 psi N/A N/A 1.0 N/A 1.76 0.85 N/A 580000 psi 3.5 in 1.5 in Depth, d = Width, b = Cross-Sectonal Area, A = Moment of Inertia, Ixx =Section Modulus, Sxx =7.5425 in20.7469 in5.25 in4 2 3 848.5 lb-ft SatisfactoryAllowable Moment, Mall = Fb'Sxx = Allowable Shear, Vall = 2/3Fv'A =990.1 lb DCR=Mu/Mall =0.34 < 1 DCR=Vu/Vall =0.22 < 1 Satisfactory Design Value Adjusted Value 5 of 5 Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and the engineering consulting firm assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. Siesmic Loads Check Roof Dead Load 10 psf 29.47% 3 psf 8.9 psf % or Roof with Pv Dpv and Racking Average Total Dead Load Increase in Dead Load 4.1% OK BLDG. A1 2150 E. FOURTH BLDG. A2 2160 E. FOURTH VICINITY MAP PV COVER RE V I S I O N S RE V DE S C R I P T I O N DA T E M AC P ROOF ACCESS POINTS SOLAR MODULES. PV MICROINVERTERS MOUNTED ON THE BACK OF EACH MODULE C SYMBOLS AND ABBREVIATIONS: MAIN SERVICE PANEL AND POINT OF INTERCONNECTION PV SYSTEM AC DISCONNECT PV SYSTEM COMBINER PANEL UTILITY PRODUCTION METER COMPOSITE SHINGLE INSET INTO TILE UNDER ARRAY SHEET INDEX: PV COVER COVER SHEET PV SP 1.0 SITE PLAN PV SP 1.1 SITE PLAN PV RL 1.0 PV LAYOUTS PV RL 1.1 PV LAYOUTS PV SR 1.0 STRUCTURAL PV EE 1.0 ELECTRICAL PV CS 1.0 CUTSHEETS PV CS 1.1 CUTSHEETS SOLAR PV PLANS OLIVE CREST 16 PLAN BLDG A1 & A2 2150 E FOURTH STREET SANTA ANA, CA 2160 E FOURTH STREET SANTA ANA, CA BUILDER / OWNER WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 J. Pasquin Solar Designer SCOPE OF WORK 1.SOLELY FOR THE INSTALLATION OF THE ROOFTOP MOUNTED PV SYSTEM(S) ASSOCIATED WITH OLIVE CREST 16 1.1.PLAN: BLDG A1 & A2 2.BUILDING INFORMATION: 2.1.BUILDING OCCUPANCY GROUP: R2 2.2.CONSTRUCTION TYPE: VA 2.3.NUMBER OF STORIES: 2-STORY 3.PV SYSTEM: 3.1.MICROINVERTER(S): 3.1.1.ENPHASE: IQ8P-3P-72-E-US (@208V) 3.2.SOLAR MODULE TYPE(S): 3.2.1.HYUNDAI: HIN-T440NF(BK) 3.3.SYSTEM SIZE(S): 3.3.1.(45) MODULES 19.800kW DC / 21.375kW AC GENERAL NOTES: 1.ELECTRICAL 1.1.ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS DESIGNED AND LISTED FOR SUCH USE. FOR ROOF-MOUNTED SYSTEMS, WIRING MUST BE PERMANENTLY AND COMPLETELY HELD OFF OF THE ROOF SURFACE. 1.2.SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH ALL RELEVANT CODE. 1.3.SEE *PV EE 1.0 FOR DIAGRAMS, CALCULATIONS, SCHEDULE AND SPECIFICATIONS. 2.STRUCTURAL 2.1.THE SOLAR PANELS ARE TO BE MOUNTED TO THE ROOF FRAMING USING THE L FOOT SYSTEM BY IRONRIDGE. THE MOUNTING FEET ARE TO BE SPACED AS SHOWN IN THE DETAILS, AND SHOULD BE STAGGERED, WHERE POSSIBLE, TO ADJACENT FRAMING MEMBERS TO SPREAD OUT THE ADDITIONAL LOAD. 2.2.UNLESS NOTED OTHERWISE, MOUNTING ANCHORS SHALL BE 5/16" LAG SCREWS WITH A MINIMUM OF 2 1/2" PENETRATION INTO ROOF FRAMING. 2.3.THE PROPOSED PV SYSTEM ADDS 3.0 psf TO THE ROOF FRAMING SYSTEM. 2.4.ROOF LIVE LOAD = 20 psf TYPICAL, 0 psf UNDER NEW PV SYSTEM. 2.5.GROUND SNOW LOAD = 4 psf 2.6.WIND SPEED = 95 mph 2.7.EXPOSURE CATEGORY = C GOVERNING CODES: ALL WORK SHALL CONFORM TO THE FOLLOWING CODES 1.2022 CA BUILDING CODE 2.2022 CA ENERGY CODE 3.2022 CA ELECTRICAL CODE 4.2022 CA FIRE CODE 5.2022 CA GREEN CODE 6.2022 CA MECHANICAL CODE 7.2022 CA PLUMBING CODE 8.2022 CA RESIDENTIAL CODE 9.ANY OTHER LOCAL AMENDMENTS 4 3 4 HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 PV SP 1.0 SITE PLAN J. Pasquin Solar Designer 2150 E FOURTH STREET SANTA ANA, CA 2160 E FOURTH STREET SANTA ANA, CA 2 2 HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 PV SP 1.1 SITE PLAN J. Pasquin Solar Designer 4 2150 E FOURTH STREET SANTA ANA, CA 2160 E FOURTH STREET SANTA ANA, CA SCALE: 3/32" = 1'-0"BUILDING(S) BLDG-A1 LAYOUT 1 LAYOUT 2 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " 61'-10" 72'-4" 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " 61'-10" 72'-4" M M M M M M M C AC M M M M M M M C AC HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 PV RL 1.0 PV ROOF LAYOUTS FIRECODE OFFSET: RIDGE:18" RAKE:18" HIP/VALLEY: 18" PV SYSTEM WILL CONFORM TO ALL APPLICABLE GOVERNING CODES AS OUTLINED ON PV COVER PAGE, NOR TO BLOCK OR COVER ANY ROOF PLUMBING OR VENTILATION. J. Pasquin Solar Designer 2150 E FOURTH STREET SANTA ANA, CA 4 5 SCALE: 3/32" = 1'-0"BUILDING(S) BLDG-A2 LAYOUT 1 LAYOUT 2 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " M M M M M M M M C AC 61'-10" 72'-4" 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " M M M M M M M M C AC 61'-10" 72'-4" HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 PV RL 1.1 PV ROOF LAYOUTS FIRECODE OFFSET: RIDGE:18" RAKE:18" HIP/VALLEY: 18" PV SYSTEM WILL CONFORM TO ALL APPLICABLE GOVERNING CODES AS OUTLINED ON PV COVER PAGE, NOR TO BLOCK OR COVER ANY ROOF PLUMBING OR VENTILATION. J. Pasquin Solar Designer 2160 E FOURTH STREET SANTA ANA, CA 4 5 MODULES: HYUNDAI: HIN-T440NF(BK) MODULE DIMENSIONS: 67.8" x 44.6" x 1.2" MODULE CLAMPS: PORTRAIT: 9.84" - 17.72" LANDSCAPE: 0" - 9.84" LAG SCREWS: 5/16" x 4 1/2": 2 1/2" MIN. EMBEDMENT MAX DISTRIBUTED LOAD: 3 PSF SNOW LOAD: 4 PSF WIND SPEED: 95 MPH 3-SEC GUST. STRUCTURAL NOTES: INSTALLERS TO VERIFY RAFTER SIZE, SPACING AND SLOPED SPANS, AND NOTIFY E.O.R. OF ANY DISCREPANCIES BEFORE PROCEEDING. PENETRATION SPACING: STAGGERED/FULLY STAGGERED MAY BE REQUIRED IF ARRAY (EXCLUDING SKIRT) IS WITHIN 12" BOUNDARY REGION OF ANY ROOF PLANE EDGES (EXCEPT VALLEYS), THEN ATTACHMENTS NEED TO BE ADDED AND OVERHANG REDUCED WITHIN THE 12" BOUNDARY REGION ONLY AS FOLLOWS: ·ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS T0 BE REDUCED BY 50%. ·ALLOWABLE OVERHANG INDICATED ON PLANS THE BE 1/5TH OF ALLOWABLE ATTACHMENT SPACING INDICATED ON PLANS. WHERE MOUNTS ARE TO BE ANCHORED TO FLAT RAFTERS, MOUNTS SHALL BE INSTALLED WITH ONE OF THE FOLLOWING OPTIONS. ·OPTION 1: INSTALL ATTACHMENTS ON EVERY FLAT RAFTER UNDER ARRAY WITH REDUCED EMBEDMENT ON FLAT 2x4 MEMBERS. USE 5/16" x 3.5" FULLY-THREADED LAG SCREWS WITH 2.5" EMBEDMENT. ·OPTION 2: BLOCKING MUST BE INSTALLED TO PROCEED WITH ATTACHMENT SPACINGS AS NOTED ON PLANSET. WHERE MOUNTS ARE TO BE ANCHORED DIRECTLY TO HORIZANTAL TRUSSES. BLOCKING MUST BE INSTALLED TO PROCEED WITH ATTACHMENT SPACINGS AS NOTED ON PLANSET. LONGER LAG SCREWS SHALL BE UTILIZED, AS NECESSARY, TO OBTAIN THE MINIMUM SPECIFIED SCREW EMBEDMENT INTO THE ROOF FRAMING. RIPPERS ON THE ROOF DO NOT QUALIFY AS THE ROOF FRAMING WHERE SOLAR PV MOUNT EMBEDMENT IS CONCERNED. INSTALLERS SHALL VERIFY SCREW EMBEDMENT REQUIREMENTS ARE MET FOR ALL MOUNTS. GENERAL NOTES: *THIS INFORMATION PRESENTED ON THIS PAGE IS MEANT TO ILLUSTRATE GENERAL MATERIALS AND INSTALLATION PRACTICES. *THE INFORMATION HERE IS SUBJECT TO CHANGE UNIQUE PLANS WILL BE CREATED FOR EACH BUILDING PRIOR TO CONSTRUCTIONS FOR REVIEW. DESIGN CRITERIA STRUCTURAL DETAILS ROOF INFORMATION ATTACHMENT INFORMATION TYPE HEIGHT ROOF PITCHES (X:12)DETAIL MAX PORTRAIT (OC SPACING) MAX PORTRAIT (OVERHANG) MAX LANDSCAPE (OC SPACING) MAX LANDSCAPE (OVERHANG)CONFIGURATION COMPOSITE SHINGLE 2-STORY 4, 2 IRONRIDGE L-FOOT 48"L/3 72"L/3 STAGGERED PORTRAIT: MAX 48" SPACING (L) MAX 10" - 16" CANTILEVER, TYP * MODULE, TYP. FRAMING, TYP. UR-40 RAIL, TYP. CANTILEVER L/3 OR LESS MAX 10" - 16" CANTILEVER, TYP * LANDSCAPE: MAX 72" SPACING (L) *DEFER TO MODULE MANUFACTURER LIMITATIONS WHERE THEIR MAXIMUM VERTICAL CANTILEVER IS SMALLER. TYPICAL MOUNT SPACING LAYOUT NOT TO SCALE1 TRUSS TOP CHORD PV MODULE l-foot COMP. SHINGLE TRUSS TOP CHORDDECKING PV MODULE IRONRIDGE RAIL QMPV L-FOOT ASSEMBLY SIDE VIEW DETAIL2 LAG BOLT - 5/16" W/ 3" MIN. EMBEDMENT, SEALED STRUCTURAL STRUCTURAL DETAILS TABLE RACKING MOUNT DETAILS PV SR 1.0 HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 J. Pasquin Solar Designer 3 Power Source(s) Output Calc: 705.12(B)(3)(2)Voltage and OCPD Calculations (690.7, 690.9) ASHRAE 2017 - SANTA ANA CITY Highest Monthly 2% D.B. Design Temp.: 31 °C Lowest Min. Mean Extreme D.B.: 2 °C System Characteristics Conductor Calculations MODULE: Max Power @ STC (Watts): Open Circuit Voltage (Volts): Max Power Voltage (Volts): Short Circuit Current (Amps): HYUNDAI: HiN-T440NF(BK) 440 38.8 32.3 14.39 INVERTER: AC Operating Voltage (Volts): Max AC Current (Amps): Max Panels Per Circuit: Short Circuit Current (Amps): Max Power @ 40 C (Watts): Max DC Voltage (Volts): ENPHASE: IQ8P-3P-72-E-US (@208V) 12 475 63 25 2.28 208 PV Source Max Circuit Voltage: Module Voc × (1-(ΔT × Voc Coeff)) [art. 690.7(A)] HYUNDAI: HIN-T440NF(BK): 38.8 V × (1-((25 C – 2 C) × -0.27%)) <= 63 V Photovoltaic System DC System Size (Watts)19800 AC System Size (Watts)21375 Total Module Count 45 Main Bus Rating: 400 Amps Main Service Breaker Rating: 400 Amps PV Uprated Output Current: 80 Amps 400A + 80A <= 400 x 1.2; 480 <= 480A, OK General Notes • Designed according to and all code citations are relevant to the 2022 California Electrical Code. • Inverter(s) used in this design is/are compliant with 690.12 (Rapid Shutdown). See manufacturer data sheet. • All inverters installed in California are Rule 21 Utility interactive compliant. • Array grounding and bonding designed in compliance with 690.47(A). • Electrical terminations and connectors used in design are listed for use at a minimum of 75°C Inverter Output Circuit(s): Modules per Circuit × Listed Output Current × 1.25 [art. 690.9(B)] Circuit #1, 3, & 5 = 8 modules × 2.28 × 1.25 = 23 <= 25 A (OCPD) System output current w/ continuous duty = 80 A (System OCPD) Circuit #2, 4, & 6 = 7 modules × 2.28 × 1.25 = 20 <= 20 A (OCPD) M* ENCLOSURE WITH ENVOY (ENV-IQ-AM3-3P) PV CIRCUIT 2: (N) 7 HYUNDAI: HIN-T440NF(BK) PV MODULES / PARALLEL, ON ROOF 1 2 7 WI T H I N I N T E R I O R W A L L C A V I T Y IN A T T I C (N) MICROINVERTER: ENPHASE: IQ8P-3P-72-E-US (@208V) (MOUNTED TO THE BACK OF EACH MODULE) PV CIRCUIT 1: (N) 8 HYUNDAI: HIN-T440NF(BK) PV MODULES / PARALLEL, ON ROOF 1 2 8 1 2 (N) NEW EXTERIOR QO327M100 PV LOAD CENTER 120/208V, 100A BUSBAR RATING, THREE-PHASE, WITH 80A MAIN DISCONNECT PV CIRCUIT 4: (N) 7 HYUNDAI: HIN-T440NF(BK) PV MODULES / PARALLEL, ON ROOF 1 2 7 PV CIRCUIT 3: (N) 8 HYUNDAI: HIN-T440NF(BK) PV MODULES / PARALLEL, ON ROOF 1 2 8 PV CIRCUIT 6: (N) 7 HYUNDAI: HIN-T440NF(BK) PV MODULES / PARALLEL, ON ROOF 1 2 7 PV CIRCUIT 5: (N) 8 HYUNDAI: HIN-T440NF(BK) PV MODULES / PARALLEL, ON ROOF 1 2 8 (N) JUNCTION BOX, NEMA 3R, ON ROOF (N) JUNCTION BOX, NEMA 3R, ON ROOF (N) JUNCTION BOX, NEMA 3R, ON ROOF 80A G N M G N 400A FACILITY GROUND L1 L2 N 380A FUSE 3 N L1 L2 G VISIBLE/LOCKABLE 'KNIFE' AC DISCONNECT (N) EXTERIOR SQUARE D VH363NRB, 208V/100A, FUSED, NEMA3R RAPID SHUTDOWN DISCONNECT POINT OF INTERCONNECTION: SUPPLY SIDE 705.12(B)(3)(2) BUILDER TO ENSURE SPD COMPLIANCE (230.67) YELLOW PLACARD WITH BLACK LETTERING TO BE INSTALLED AT MAIN BILLING METER STATING: "PHOTOVOLTAIC SYSTEM CONNECTED" EXISTING 120/208V EXTERIOR SERVICE PANEL, 400A BUSBAR RATING, THREE-PHASE M M M M MMMM L3 L3 25A 20A 25A 20A 25A 20A 2 1 2 2 1 2 2 1 2 2 1 2 2 1 2 2 20A CONDUIT CONDUCTOR SCHEDULE (UNLESS OTHERWISE SPECIFIED, CONDUCTORS SHALL BE COPPER) TAG CONDUCTOR NEUTRAL GROUND CONDUIT 1 2 3 Wire ampacity calculated from 310.15(B)(1) & (C)(2) as appropriate with ambient temperature calculations from 310.15(B)(1) & 310.15(C)(2) and raceway fill adjustments from 310.15(B)(3)(a) Conduit on the roof shall be installed no less than 1” above the roof deck. PV Circuit conductor ampacity is constrained using the 75°C column with the continuous duty uprating or the 90°C column with the relevant ambient temperature and raceway fill adjustments without the continuous duty uprating per 690.8(B), whichever results with a larger wire size. Non-PV Circuit conductors use the ampacity in the 75°C column or the 90°C column with the relevant ambient temperature and raceway fill adjustments, whichever is less (110.14(C) & 310.15(A)(2)). The rating of the conductor after adjustments shall be greater than, or equal to, the continuous duty uprated current. More information about conductor calculations can be provided upon request. Calc. Ex: Wire Ampacity x Ambient Temp. Corr. Factor x Conduit Fill Adj. Factor >= Output Current (Tag 1 Under Array): (Tag 2 Attic): (Tag 3 Exterior): *"FREE AIR" CONDUIT TO BE PROTECTED BY RUNNING THROUGH WALL CAVITIES* FREE AIR FREE AIR NONE (1) 8 AWG NM (1) 10 AWG NM (1) 6 AWG BARE COPPER (1) 3 AWG NM NONE NONE (3) 3 AWG NM (3) 10 AWG NM (3) 12 AWG Q-CABLE Inverter Output: 12 AWG rated 40A, 40A >= 20A Inverter Output: 10 AWG rated 30A, 30A >= 20A Inverter Output: 3 AWG rated 85A, 85A >= 80A (15) * (2.28A) * (1.732) * 1.25 = 74.043A ~ 80 A 3-PHASE CURRENT CALCULATION: NOTE: ROMEX CABLE SHALL NOT BE ROUTED OUTSIDE THE BUILDING ENVELOPE IN ANY MANNER, INCLUDING IN CONDUIT. FIELD CONDITIONS OR INSTALLATION CONVENIENCE SHALL NOT JUSTIFY NM USE OUTSIDE THE STRUCTURE. ALL EXTERIOR, PV, ESS, ACD, AND INTERCONNECTION WIRING SHALL UTILIZE APPROVED OUTDOOR-RATED CONDUCTORS AND METHODS PER NEC. NOTE:THE ELECTRICAL SYSTEM SHOWN IN THIS SINGLE-LINE DIAGRAM IS APPLICABLE TO BUILDINGS A1 AND A2. ELECTRICAL THREE LINE DIAGRAM WARNING LABELS LABEL GUIDE PV EE 1.0 HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 J. Pasquin Solar Designer 2 2 3 3 3 4 MAXIMUM AC OPERATING CURRENT:59 A NOMINAL AC OPERATING VOLTAGE:208 VAC PHOTOVOLTAIC AC DISCONNECT Warning Labels SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY WARNING WARNING WARNING ELECTRICAL SHOCK HAZARD TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE DUAL POWER SOURCE SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM 4" 3" WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BUSBAR ! ! ! ! LABEL LOCATION: INVERTER(S), AC/DC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): NEC 2020: 690.13(B), CEC 2022: 690.13(B) LABEL LOCATION: UTILITY SERVICE METER AND MAIN SERVICE PANEL. PER CODE(S): NEC 2020: 705.12(C), CEC 2022: 705.12(C) LABEL LOCATION: ADJACENT TO PV BREAKER AND ESS OCPD (IF APPLICABLE). PER CODE(S): NEC 2020: 705.12(B)(3)(2), CEC 2022: 705.12(B)(3)(2) LABEL LOCATION: PV LOAD CENTER (IF APPLICABLE) AND ANY PANEL THAT UTILIZES "THE SUM OF BREAKERS RULE". PER CODE(S): NEC 2020: 705.12 (B)(3)(3), CEC 2022: 705.12 (B)(3)(3) LABEL LOCATION: ON OR NO MORE THAN 1 M (3FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. PER CODE(S): NEC 2020: 690.56(C), CEC 2022: 690.56(C) MAXIMUM SYSTEM VOTAGE:480 VDC PHOTOVOLTAIC DC DISCONNECT LABEL LOCATION: INVERTER(S), DC DISCONNECT(S). PER CODE(S): NEC 2020: 690.53, CEC 2022: 690.53 RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL LOCATION: INSTALLED WITHIN 3' OF RAPID SHUTDOWN SWITCH PER CODE(S): NEC 202: 690.56(C)(2), CEC 2022: 690.56(C)(2), IFC 2018: 1405.5.3 NOTES AND SPECIFICATIONS: ·SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF THE 2022 CEC ARTICLE 110.21(B), UNLESS SPECIFIC INSTRUCTIONS ARE REQUIRED BY SECTION 690, OR IF REQUESTED BY THE LOCAL AHJ. ·SIGNS AND LABELS SHALL ADEQUATELY WARN OF HAZARDS USING EFFECTIVE WORDS, COLORS AND SYMBOLS. ·LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HAND WRITTEN. ·LABEL SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. ·SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY SIGNS AND LABELS, UNLESS OTHERWISE SPECIFIED. ·DO NOT COVER EXISTING MANUFACTURER LABELS. LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): NEC 2020: 690.54, CEC 2022: 690.54 WARNING: PHOTOVOLTAIC POWER SOURCE LABEL LOCATION: INTERIOR AND EXTERIOR DC CONDUIT EVERY 10 FT, AT EACH TURN, ABOVE AND BELOW PENETRATIONS, ON EVERY JB/PULL BOX CONTAINING DC CIRCUITS. PER CODE(S): NEC 2020: 690.56(C)(2), CEC 2022: 690.56(C)(2), IFC 2018: 1204.5.3 (OPTION 1)(OPTION 2) ELECTRICAL WARNING LABELS LABEL GUIDE PV PL 1.0 HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 J. Pasquin Solar Designer ROOFTOP ARRAY WITH MICROINVERTERS 2 4 1 3 5 ROOFTOP JUNCTION BOX COMBINER PANEL (WHEN USED) VISIBLE/LOCKABLE A/C DISCONNECT TYPICAL SOLAR GENERATION INSTALLATION (NOT ALL DEVICES ARE REQUIRED IN EVERY JURISDICTION) MAIN SERVICE DISCONNECT PANEL *** - value calculated for each account, for specific value see the previous warning label page 3 5 INSIDE PANEL 6 5 M 7 8 3 IF APPLICABLE HO U S E E X T E R I O R RO O F T O P & A T T I C ( I F A P P L I C A B L E ) 1 2 RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM PHOTOVOLTAIC AC DISCONNECT 3 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN 4 MAXIMUM AC OUTPUT CURRENT: *** A NOMINAL AC OPERATING VOLTAGE: *** V SITE PLACARD SHOWING ADDITIONAL POWER SOURCE AND DISCONNECT LOCATIONS. PLACARD SHALL BE MOUNTED ON EXTERIOR OF ELECTRICAL PANEL 5 6 TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING POWER SOURCE OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT PROTECTION DEVICE 8 7 DUAL POWER SOURCE SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM MAIN BREAKER DE-RATED DUE TO SOLAR CIRCUITS ***AMPS MAX ALLOWED DO NOT UPGRADE WARNING WARNING 4 CAUTION: MULTIPLE SOURCES OF POWER POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECT LOCATED AS SHOWN LOT SPECIFIC PLACARDS TO BE PROVIDED WITH INDIVIDUAL TRADE LAYOUTS PER CODE(S): NEC 2020 : 705.10, 710.10, CEC 2022: 705.10, 710.10 2160 E FOURTH STREET LOT SPECIFIC PLACARDS TO BE PROVIDED WITH INDIVIDUAL TRADE LAYOUTS PER CODE(S): NEC 2020 : 705.10, 710.10, CEC 2022: 705.10, 710.10 2160 E FOURTH STREET CAUTION: MULTIPLE SOURCES OF POWER POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECT LOCATED AS SHOWN CAUTION: MULTIPLE SOURCES OF POWER POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECT LOCATED AS SHOWN LOT SPECIFIC PLACARDS TO BE PROVIDED WITH INDIVIDUAL TRADE LAYOUTS PER CODE(S): NEC 2020 : 705.10, 710.10, CEC 2022: 705.10, 710.10 2150 E FOURTH STREET LOT SPECIFIC PLACARDS TO BE PROVIDED WITH INDIVIDUAL TRADE LAYOUTS PER CODE(S): NEC 2020 : 705.10, 710.10, CEC 2022: 705.10, 710.10 2150 E FOURTH STREET CAUTION: MULTIPLE SOURCES OF POWER POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECT LOCATED AS SHOWN (OPTION 1)(OPTION 2) (OPTION 1)(OPTION 2) 2150 E FOURTH STREET 2160 E FOURTH STREET M M M M M M M C AC M M M M M M M C AC PHOTOVOLTAIC ARRAY ON ROOF MAIN SERVICE PANEL IQ COMBINER (EXT) AC DISCONNECT (EXT) PHOTOVOLTAIC ARRAY ON ROOF MAIN SERVICE PANEL IQ COMBINER (EXT) AC DISCONNECT (EXT) PHOTOVOLTAIC ARRAY ON ROOFPHOTOVOLTAIC ARRAY ON ROOF M M M M M M M C AC MAIN SERVICE PANEL IQ COMBINER (EXT) AC DISCONNECT (EXT) M M M M M M M M C AC MAIN SERVICE PANEL IQ COMBINER (EXT) AC DISCONNECT (EXT) M PV CS 1.0 HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 CUTSHEETS MICROINVERTER COMBINER PANEL MODULE J. Pasquin Solar Designer PV CS 1.1 HOME DEVELOPER: WJK DEVELOPMENT 16520 BAKE PKWY IRVINE, CA 92618 OLIVE CREST 16 SANTA ANA, CA REV: A DATE: 3/2/2026 PV SYSTEM PROVIDED BY: CA LICENSE: 1125771 CUTSHEETS AC DISCONNECT J. Pasquin Solar Designer