1. Load information
2. Lateral Analysis
3. Shearwall Design
4. Framing Design
5. Foundation Design
2-6
7-10
11-17
18-26
27
1
GEN ER AL I N FO RMATI O NGENERAL INFO R MATIO N
I .I .G e n e r a l:G e n e r a l :
Number of stories 1
Building risk category II
Design Code 2022 CBC
Load standard ASCE 7-16
Design Load Combination ASD
I I .I I .L a t e r a l P a r a m e t e r L o a d s :L a t e r a l P a r a m e t e r L o a d s :
A . W I N DA. W I N D ASCE 7-16(Directional Procedure)
Exposure C
Wind Speed V 95
Enclosure Enclosed Building
Velocity pressure qz 0.00256Kz Kz tKdKeV2 (26.10-1)
Velocity pressure exposure coefficient Kz from (Table 26.10-1)
Directionality Factor Kd 0.85 (Table 26.6-1)
Topographic factor defined Kz t 1 (26.8.2)
Gust Effect Factor G 0.85 (26.11)
Pressures for MWFRS p qGCp - qi(GCp i)(27.3-1)
External pressure coefficient Cp from (Fig. 27.3-1)
Internal pressure coefficient (GCp i)0.18 (Table 26.13-1)}
B . S E I S M I CB. S E I S M I C ASCE 7-16(Equivalent Lateral Force Procedure)
Seismic Design Category D (Table 11.6-1)
Importance factor Ie 1 (Table 1.5-2)
Soil Site Class D-Default (Table 20-3-1)
Response Spectral Acc. (0.2 sec) Ss 1.334
Response Spectral Acc. (1.0 sec) S1 0.475
TL (sec)8
Fa 1.2 (Table 11.4-1)
Fv 1.825 (Table 11.4-2)
Max. Considered earthquake acc. SMS 1.601 (11.4-1)
Max. Considered earthquake acc. SM1 0.867 (11.4-2)
Design spectral acc. At short period SDS 1.067 (11.4-3)
Design spectral acc. at 1s period SD1 0.578 (11.4-4)
Response modification coefficient R 6.5 (Table 12.2-1)
System overstrength coefficient Ω2.5 (Table 12.2-1)
Approximate fundamental period
parameters Ct = 0.02 x = 0.75 (Table 12.8-2)
Building Height (ft)11.25
Building period T=Ta (sec)0.123 (12.8-7)
Base Shear Adjustment Factor 1
Minimum Cs 0.047 (12.8-5 & 12.8-6)
Maximum Cs 0.724 (12.8-3 & 12.8-4)
Seismic response coefficient Cs 0.164 (12.8-2)
Adjusted Cs 0.164
For allowable stress design V = 0.7CsW 0.115W
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
2
R oo f L oad s [R e m a r k : R oo f ]Ro of L o a ds [Re mar k : Ro of ]
Asphalt shingles 2 psf
Framing 2.5 psf
Sheathing (1/2" CDX)1.5 psf
Ceiling 2.5 psf
Insulation 1.5 psf
MISC.5 psf
De a d Lo a dDead Lo a d 1 515 p sfpsf
Li ve Lo a dLive L o a d 2020 p sfpsf
T o t a l Lo a dTotal L o a d 3535 p sfpsf
I n t e r i o r Wal l [R e m a r k : I-W a l l ]In te r i or W a l l [Re mar k : I-Wal l ]
Insulation 1 psf
Drywall 5 psf
Studs 1 psf
Misc.3 psf
De a d Lo a dDead Lo a d 1 010 p sfpsf
E x te r i or W a l l [R e m ar k : E -W a l l ]E xte r i o r Wal l [R e m a r k : E -Wal l ]
7/8" Stucco 10 psf
Insulation 1 psf
Drywall 2.5 psf
Studs 1 psf
Misc.2.5 psf
De a d Lo a dDead Lo a d 1 717 p sfpsf
C e i l i n g [R e m ar k : C e i l i n g]C e i l i n g [R e m a r k : Ce i l i n g ]
FRAMING 2.2 psf
Gyp Board under joist 2.8 psf
Insulation 1.5 psf
Misc.1.5 psf
De a d Lo a dDead Lo a d 88 p sfpsf
Li ve Lo a dLive L o a d 1 010 p sfpsf
T o t a l Lo a dTotal L o a d 1 818 p sfpsf
DESI GN LO ADSDESIGN LO ADS
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
3
ASCE Hazards Report
Address:
805 Clemensen Ave
Santa Ana, California
92705
Standard:ASCE/SEI 7-16 Latitude:33.773645
Risk Category:II Longitude:-117.859683
Soil Class:D - Default (see
Section 11.4.3)
Elevation:167.8823039188215 ft
(NAVD 88)
Wind
Results:
Wind Speed 95 Vmph
10-year MRI 66 Vmph
25-year MRI 72 Vmph
50-year MRI 76 Vmph
100-year MRI 81 Vmph
Data Source: ASCE/SEI 7-16, Fig. 26.5-1B and Figs. CC.2-1–CC.2-4, and Section 26.5.2
Date Accessed: Thu Jul 10 2025
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind speeds
correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability =
0.00143, MRI = 700 years).
Site is not in a hurricane-prone region as defined in ASCE/SEI 7-16 Section 26.2.
https://ascehazardtool.org/Thu Jul 10 2025
4
SS : 1.334
S1 : 0.475
F a : 1.2
F v : N/A
SMS : 1.601
SM1 : N/A
SDS : 1.067
SD1 : N/A
T L : 8
PGA : 0.561
PGA M : 0.673
F PGA : 1.2
Ie : 1
C v : 1.367
Seismic
Site Soil Class:
Results:
Data Accessed:
Date Source:
D - Default (see Section 11.4.3)
USGS Seismic Design Maps
Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8.
Thu Jul 10 2025
https://ascehazardtool.org/Thu Jul 10 2025
5
The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any
kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or
has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable
sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or
quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation,
relationship, or sponsorship of such third-party content by or from ASCE.
ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent
professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such
professionals in interpreting and applying the contents of this Tool or the ASCE standard.
In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors,
employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential
damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by
law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data
provided by the ASCE Hazard Tool.
https://ascehazardtool.org/Thu Jul 10 2025
6
G E N E R A L :G E N E R A L :
Sto r y
T op Plate He igh t
(ft)
Roof He ig h t (ft) /
Floor De pth (in )
I gn or e d W W wall I gn or e d LW wall
R O O F 8 3 .2 5 N o N o
Dim e n sion (ft)W id th De pth He igh t B ase He igh t
B u ildin g 73 (B)6 2 (L)1 1 .2 5 0 .5
Diaph ragm 3 2 .5 18 -0 .5
W I N D L O A D :W I N D L O A D :
K d = 0 .8 5 G = 0 .8 5 L/B =6 2 /73 =0 .8 5
W in dwar d W all C pw = 0 .8 Le e war d W all C pl = -0 .5 ,
qh = 16 .6 7 (PSF) qz = 0 .0 0 2 5 6 K zK ztK dV 2 (P SF) W all pr e ss. = (GC pwqz+GC plqh)h T (P LF)
R O O F E LE M E N T (P LF)
W Dir
(+C pi)
W Dir
(-C pi)
O W Dir
(+C pi)
OW Dir
(-C p i)
Slo p e (W in d war d ): W id th =3 2 .5 ft, Slope = 3 /12
Slo p e (Le e W ar d ): W id th =3 2 .5 ft, Slope = 3 /12
-8 .15
3 1
11.3 5
1 1 .5
3 1
-8 .15
11.5
11.3 5
Diaph _Stor y z (ft)K z qz h T (ft)W all pre ss W in d_A SD (PLF)
D1 (W -E )_ROOF 8 .5 .8 1 6 .7 4 73 .7 5 7 .9 257.9 2
T O T A L 5 7 .9 257.9 2
S E I S M I C L O A D :S E I S M I C L O A D :(C s_A SD = 0 .114 9 )
Sto r y Load T ype
W e igh t W
(P LF)
C s*W (PLF)
R O O F
R oof (DL)= 15 x 6 0 0 / 3 2 .5 2 76 .9 2 3 1.8 2
E -W all (DL)= 17 x 5 0 x (8 /2 ) / 3 2 .5 10 4 .6 2 12 .0 2
I-W all (DL)= 10 x 10 x (8 /2 ) / 3 2 .5 12 .3 1 1.4 1
T O T A L SE ISM I C LOA D 4 5 .2 545.2 5
Diaph _Story W x (PLF)Hx (ft)
W xx h x
/su m (W ix h i)
Fx (P LF)
D1 (W -E )_R O O F 3 9 3 .8 5 8 1 4 5 .2 545.2 5
G E N E R A L :G E N E R A L :
Sto r y
T op Plate He igh t
(ft)
Roof He ig h t (ft) /
Floor De pth (in )
I gn or e d W W wall I gn or e d LW wall
R O O F 8 3 .2 5 N o N o
Dim e n sion (ft)W id th De pth He igh t B ase He igh t
B u ildin g 6 2 (B )73 (L )1 1 .2 5 0 .5
Diaph ragm 18 3 2 .5 -0 .5
W I N D L O A D :W I N D L O A D :
K d = 0 .8 5 G = 0 .8 5 L/B =73 /6 2 =1.18
W in d war d W all C p w = 0 .8 L e e war d W all C p l = -0 .4 6 ,
qh = 16 .6 7 (PSF) qz = 0 .0 0 2 5 6 K zK ztK dV 2 (P SF) W all pr e ss. = (GC pwqz+GC plqh)h T (P LF)
R O O F E LE M E N T (P LF)
W Dir
(+C pi)
W Dir
(-C pi)
O W Dir
(+C pi)
OW Dir
(-C p i)
Slope (W in dwar d): W idth =18 ft, Slo p e = 3 /1 2
Slope (L e e W ar d): W idth =18 ft, Slo p e = 3 /1 2
-8 .15
3 1
11.3 5
1 1 .5
3 1
-8 .15
11.5
11.3 5
Diaph _Stor y z (ft)K z qz h T (ft)W all pre ss W in d_A SD (PLF)
D1 (S-N )_R O O F 8 .5 .8 1 6 .7 4 71.7 5 6 .7 156.7 1
T O T A L 5 6 .7 156.7 1
S E I S M I C L O A D :S E I S M I C L O A D :(C s_A SD = 0 .114 9 )
Sto r y Load T ype
W e igh t W
(P LF)
C s*W (PLF)
R O O F
R oof (DL)= 15 x 6 0 0 / 18 5 0 0 .0 0 5 7.4 5
E -W all (DL)= 17 x 18 x (8 /2 ) / 18 6 8 .0 0 7.8 1
I-W all (DL)= 10 x 3 5 x (8 /2 ) / 18 77.78 8 .9 4
T O T A L SE ISM I C LOA D 7 4 .274.2
Diaph _Story W x (PLF)Hx (ft)
W xx h x
/su m (W ix h i)
Fx (P LF)
D1 (S-N )_ROOF 6 4 5 .78 8 1 7 4 .274.2
D I A P H R A G M D 1 – D I R E C T I O N W -EDIAPHRAGM D 1 – D I R E C T I O N W -E
D I A P H R A G M D E S I G N :D I A P H R A G M D E S I G N :
Diaph ragm se ism ic loadin g:
Story Su m (Fi) (P LF)Su m (W i) (P LF)Fpx (P LF)Fpx M in (P LF)Fpx M ax (PLF)Fpx De sig n (P LF)
ROOF 4 5 .2 5 3 9 3 .8 5 4 5 .2 5 6 0 .0 5 12 0 .0 9 6 0 .0 560.0 5
C ode c h e ck :
Story
Diaph r ag m Se ism ic sh e ar W in d sh e ar
Sh e ath in g N ail W idth (ft)De p th (ft)A pplie d (L B )A lo w. (L B )R atio A p p lie d (LB )A lo w. (L B )Ratio
ROOF 15 /3 2 Sh e ath in g an d Sin gle -Floor U n block e d 8 d @ 6 ”, 6 ”, 12 ” O .C .3 2 .5 18 5 4 .2 2 4 0 0 .2 3 5 2 .3 3 3 5 0 .16
D I A P H R A G M D 1 – D I R E C T I O N S -NDIAPHRAGM D 1 – D I R E C T I O N S -N
D I A P H R A G M D E S I G N :D I A P H R A G M D E S I G N :
Diaph ragm se ism ic loadin g:
Story Su m (Fi) (P LF)Su m (W i) (P LF)Fpx (P LF)Fpx M in (P LF)Fpx M ax (PLF)Fpx De sig n (P LF)
ROOF 74 .2 6 4 5 .78 74 .2 9 8 .4 5 1 9 6 .9 1 9 8 .4 598.4 5
C ode c h e ck :
Story
Diaph r ag m Se ism ic sh e ar W in d sh e ar
Sh e ath in g N ail W idth (ft)De p th (ft)A pplie d (L B )A lo w. (L B )R atio A p p lie d (LB )A lo w. (L B )Ratio
ROOF 15 /3 2 Sh e ath in g an d Sin gle -Floor U n block e d 8 d @ 6 ”, 6 ”, 12 ” O .C .18 3 2 .5 2 7.3 18 0 0 .1 5 1 5 .7 2 5 2 0 .0 6
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
7
G E N E R A L :G E N E R A L :
Sto r y
T op Plate He igh t
(ft)
Roof He ig h t (ft) /
Floor De pth (in )
I gn or e d W W wall I gn or e d LW wall
R O O F 8 3 .2 5 N o N o
Dim e n sion (ft)W id th De pth He igh t B ase He igh t
B u ildin g 73 (B)6 2 (L)1 1 .2 5 0 .5
Diaph ragm 15 7 -0 .5
W I N D L O A D :W I N D L O A D :
K d = 0 .8 5 G = 0 .8 5 L/B =6 2 /73 =0 .8 5
W in dwar d W all C pw = 0 .8 Le e war d W all C pl = -0 .5 ,
qh = 16 .6 7 (PSF) qz = 0 .0 0 2 5 6 K zK ztK dV 2 (P SF) W all pr e ss. = (GC pwqz+GC plqh)h T (P LF)
R O O F E LE M E N T (P LF)
W Dir
(+C pi)
W Dir
(-C pi)
O W Dir
(+C pi)
OW Dir
(-C p i)
Slope (W in dwar d): W idth =15 ft, Slo p e = 3 /1 2
Slope (L e e W ar d): W idth =15 ft, Slo p e = 3 /1 2
-8 .15
3 1
11.3 5
1 1 .5
3 1
-8 .15
11.5
11.3 5
Diaph _Stor y z (ft)K z qz h T (ft)W all pre ss W in d_A SD (PLF)
D2 (W -E )_R O O F 8 .5 .8 1 6 .7 4 73 .7 5 7 .9 257.9 2
T O T A L 5 7 .9 257.9 2
S E I S M I C L O A D :S E I S M I C L O A D :(C s_A SD = 0 .114 9 )
Sto r y Load T ype
W e igh t W
(P LF)
C s*W (PLF)
R O O F
R oof (DL)= 15 x 10 5 / 15 10 5 .0 0 12 .0 6
E -W all (DL)= 17 x 15 x (8 /2 ) / 15 6 8 .0 0 7.8 1
T O T A L SE ISM I C LOA D 1 9 .8 819.8 8
Diaph _Story W x (PLF)Hx (ft)
W xx h x
/su m (W ix h i)
Fx (P LF)
D2 (W -E )_ROOF 173 8 1 1 9 .8 819.8 8
G E N E R A L :G E N E R A L :
Sto r y
T op Plate He igh t
(ft)
Roof He ig h t (ft) /
Floor De pth (in )
I gn or e d W W wall I gn or e d LW wall
R O O F 8 3 .2 5 N o N o
Dim e n sion (ft)W id th De pth He igh t B ase He igh t
B u ildin g 6 2 (B )73 (L )1 1 .2 5 0 .5
Diaph ragm 7 15 -0 .5
W I N D L O A D :W I N D L O A D :
K d = 0 .8 5 G = 0 .8 5 L/B =73 /6 2 =1.18
W in d war d W all C p w = 0 .8 L e e war d W all C p l = -0 .4 6 ,
qh = 16 .6 7 (PSF) qz = 0 .0 0 2 5 6 K zK ztK dV 2 (P SF) W all pr e ss. = (GC pwqz+GC plqh)h T (P LF)
R O O F E LE M E N T (P LF)
W Dir
(+C pi)
W Dir
(-C pi)
O W Dir
(+C pi)
OW Dir
(-C p i)
Slope (W in dward): W idth =7 ft, Slope = 3 /12
Slope (Le e W ard): W idth =7 ft, Slope = 3 /12
-8 .15
3 1
11.3 5
1 1 .5
3 1
-8 .15
11.5
11.3 5
Diaph _Stor y z (ft)K z qz h T (ft)W all pre ss W in d_A SD (PLF)
D2 (S-N )_ROOF 8 .5 .8 1 6 .7 4 71.7 5 6 .7 156.7 1
T O T A L 5 6 .7 156.7 1
S E I S M I C L O A D :S E I S M I C L O A D :(C s_A SD = 0 .114 9 )
Sto r y Load T ype
W e igh t W
(P LF)
C s*W (PLF)
R O O F
R oof (DL)= 15 x 10 5 / 7 2 2 5 .0 0 2 5 .8 5
E -W all (DL)= 17 x 14 x (8 /2 ) / 7 13 6 .0 0 15 .6 3
T O T A L SE ISM I C LOA D 4 1 .4 841.4 8
Diaph _Story W x (PLF)Hx (ft)
W xx h x
/su m (W ix h i)
Fx (P LF)
D2 (S-N )_R O O F 3 6 1 8 1 4 1 .4 841.4 8
D I A P H R A G M D 2 – D I R E C T I O N W -EDIAPHRAGM D 2 – D I R E C T I O N W -E
D I A P H R A G M D E S I G N :D I A P H R A G M D E S I G N :
Diaph ragm se ism ic loadin g:
Story Su m (Fi) (P LF)Su m (W i) (P LF)Fpx (P LF)Fpx M in (P LF)Fpx M ax (PLF)Fpx De sig n (P LF)
ROOF 1 9 .8 8 173 1 9 .8 8 2 6 .3 8 5 2 .75 2 6 .3 826.3 8
C ode c h e ck :
Story
Diaph r ag m Se ism ic sh e ar W in d sh e ar
Sh e ath in g N ail W idth (ft)De p th (ft)A pplie d (L B )A lo w. (L B )R atio A p p lie d (LB )A lo w. (L B )Ratio
ROOF 15 /3 2 Sh e ath in g an d Sin gle -Floor U n block e d 8 d @ 6 ”, 6 ”, 12 ” O .C .15 7 2 8 .3 2 4 0 0 .1 2 6 2 .1 3 3 5 0 .19
D I A P H R A G M D 2 – D I R E C T I O N S -NDIAPHRAGM D 2 – D I R E C T I O N S -N
D I A P H R A G M D E S I G N :D I A P H R A G M D E S I G N :
Diaph ragm se ism ic loadin g:
Story Su m (Fi) (P LF)Su m (W i) (P LF)Fpx (P LF)Fpx M in (P LF)Fpx M ax (PLF)Fpx De sig n (P LF)
ROOF 4 1 .4 8 3 6 1 4 1 .4 8 5 5 .0 4 110 .0 7 5 5 .0 455.0 4
C ode c h e ck :
Story
Diaph r ag m Se ism ic sh e ar W in d sh e ar
Sh e ath in g N ail W idth (ft)De p th (ft)A pplie d (L B )A lo w. (L B )R atio A p p lie d (LB )A lo w. (L B )Ratio
ROOF 15 /3 2 Sh e ath in g an d Sin gle -Floor U n block e d 8 d @ 6 ”, 6 ”, 12 ” O .C .7 15 12 .8 18 0 0 .0 7 13 .2 2 5 2 0 .0 5
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
8
G E N E R A L :G E N E R A L :
Sto r y
T op Plate He igh t
(ft)
Roof He ig h t (ft) /
Floor De pth (in )
I gn or e d W W wall I gn or e d LW wall
R O O F 8 6 .5 N o N o
Dim e n sion (ft)W id th De pth He igh t B ase He igh t
B u ildin g 73 (B)6 2 (L)1 1 .2 5 0 .5
Diaph ragm 3 3 3 3 .5 -0 .5
W I N D L O A D :W I N D L O A D :
K d = 0 .8 5 G = 0 .8 5 L/B =6 2 /73 =0 .8 5
W in dwar d W all C pw = 0 .8 Le e war d W all C pl = -0 .5 ,
qh = 16 .6 7 (PSF) qz = 0 .0 0 2 5 6 K zK ztK dV 2 (P SF) W all pr e ss. = (GC pwqz+GC plqh)h T (P LF)
R O O F E LE M E N T (P LF)
W Dir
(+C pi)
W Dir
(-C pi)
O W Dir
(+C pi)
OW Dir
(-C p i)
Slo p e (W in d war d ): W id th =3 3 ft, Slope = 4 /12
Slo p e (Le e W ar d ): W id th =3 3 ft, Slope = 4 /12
-6 .8 5
78 .2 1
3 2 .1 6
3 9 .2
78 .2 1
-6 .8 5
3 9 .2
3 2 .16
Diaph _Stor y z (ft)K z qz h T (ft)W all pre ss W in d_A SD (PLF)
D3 (W -E )_R O O F 8 .5 .8 1 6 .7 4 73 .7 8 7 .0 387.0 3
T O T A L 8 7 .0 387.0 3
S E I S M I C L O A D :S E I S M I C L O A D :(C s_A SD = 0 .114 9 )
Sto r y Load T ype
W e igh t W
(P LF)
C s*W (PLF)
R O O F
R oof (DL)= 15 x 110 0 / 3 3 5 0 0 .0 0 5 7.4 5
E -W all (DL)= 17 x 3 3 x (8 /2 ) / 3 3 6 8 .0 0 7.8 1
I-W all (DL)= 10 x 5 5 x (8 /2 ) / 3 3 6 6 .6 7 7.6 6
T O T A L SE ISM I C LOA D 7 2 .9 272.9 2
Diaph _Story W x (PLF)Hx (ft)
W xx h x
/su m (W ix h i)
Fx (P LF)
D3 (W -E )_ROOF 6 3 4 .6 7 8 1 7 2 .9 272.9 2
G E N E R A L :G E N E R A L :
Sto r y
T op Plate He igh t
(ft)
Roof He ig h t (ft) /
Floor De pth (in )
I gn or e d W W wall I gn or e d LW wall
R O O F 8 6 .5 N o N o
Dim e n sion (ft)W id th De pth He igh t B ase He igh t
B u ildin g 6 2 (B )73 (L )1 1 .2 5 0 .5
Diaph ragm 3 3 .5 3 3 -0 .5
W I N D L O A D :W I N D L O A D :
K d = 0 .8 5 G = 0 .8 5 L/B =73 /6 2 =1.18
W in d war d W all C p w = 0 .8 L e e war d W all C p l = -0 .4 6 ,
qh = 16 .6 7 (PSF) qz = 0 .0 0 2 5 6 K zK ztK dV 2 (P SF) W all pr e ss. = (GC pwqz+GC plqh)h T (P LF)
R O O F E LE M E N T (P LF)
W Dir
(+C pi)
W Dir
(-C pi)
O W Dir
(+C pi)
OW Dir
(-C p i)
Slo p e (W in d war d ): W id th =3 3 .5 ft, Slope = 4 /12
Slo p e (Le e W ar d ): W id th =3 3 .5 ft, Slope = 4 /12
-6 .8 5
78 .2 1
3 2 .1 6
3 9 .2
78 .2 1
-6 .8 5
3 9 .2
3 2 .16
Diaph _Stor y z (ft)K z qz h T (ft)W all pre ss W in d_A SD (PLF)
D3 (S-N )_ROOF 8 .5 .8 1 6 .7 4 71.7 8 5 .8 285.8 2
T O T A L 8 5 .8 285.8 2
S E I S M I C L O A D :S E I S M I C L O A D :(C s_A SD = 0 .114 9 )
Sto r y Load T ype
W e igh t W
(P LF)
C s*W (PLF)
R O O F
R oof (DL)= 15 x 110 0 / 3 3 .5 4 9 2 .5 4 5 6 .5 9
E -W all (DL)= 17 x 6 7 x (8 /2 ) / 3 3 .5 13 6 .0 0 15 .6 3
I-W all (DL)= 10 x 4 5 x (8 /2 ) / 3 3 .5 5 3 .73 6 .17
T O T A L SE ISM I C LOA D 7 8 .3 978.3 9
Diaph _Story W x (PLF)Hx (ft)
W xx h x
/su m (W ix h i)
Fx (P LF)
D3 (S-N )_R O O F 6 8 2 .2 7 8 1 7 8 .3 978.3 9
D I A P H R A G M D 3 – D I R E C T I O N W -EDIAPHRAGM D 3 – D I R E C T I O N W -E
D I A P H R A G M D E S I G N :D I A P H R A G M D E S I G N :
Diaph ragm se ism ic loadin g:
Story Su m (Fi) (P LF)Su m (W i) (P LF)Fpx (P LF)Fpx M in (P LF)Fpx M ax (PLF)Fpx De sig n (P LF)
ROOF 72 .9 2 6 3 4 .6 7 72 .9 2 9 6 .76 19 3 .5 2 9 6 .7 696.7 6
C ode c h e ck :
Story
Diaph r ag m Se ism ic sh e ar W in d sh e ar
Sh e ath in g N ail W idth (ft)De p th (ft)A pplie d (L B )A lo w. (L B )R atio A p p lie d (LB )A lo w. (L B )Ratio
ROOF 15 /3 2 Sh e ath in g an d Sin gle -Floor U n block e d 8 d @ 6 ”, 6 ”, 12 ” O .C .2 0 3 3 .5 2 8 .9 2 4 0 0 .1 2 2 6 3 3 5 0 .0 8
D I A P H R A G M D 3 – D I R E C T I O N S -NDIAPHRAGM D 3 – D I R E C T I O N S -N
D I A P H R A G M D E S I G N :D I A P H R A G M D E S I G N :
Diaph ragm se ism ic loadin g:
Story Su m (Fi) (P LF)Su m (W i) (P LF)Fpx (P LF)Fpx M in (P LF)Fpx M ax (PLF)Fpx De sig n (P LF)
ROOF 78 .3 9 6 8 2 .2 7 78 .3 9 10 4 .0 2 2 0 8 .0 3 1 0 4 .0 2104.0 2
C ode c h e ck :
Story
Diaph r ag m Se ism ic sh e ar W in d sh e ar
Sh e ath in g N ail W idth (ft)De p th (ft)A pplie d (L B )A lo w. (L B )R atio A p p lie d (LB )A lo w. (L B )Ratio
ROOF 15 /3 2 Sh e ath in g an d Sin gle -Floor U n block e d 8 d @ 6 ”, 6 ”, 12 ” O .C .2 0 3 3 3 1.5 18 0 0 .1 8 2 6 2 5 2 0 .1
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
9
DW
D1
D2
D3
C
B
A
1 2 3
ROOF SHEAR WALL LAYOUT
SHEARWALL LAYOUT
JOB NO.:
SHEET:
10
A . O VE R T U R N I N G LO A D C O M B I N A TIO N SA. O VE R T U R N I N G LO A D C O M B I N A T I O N S
U P LI F TUPLIFT DO W NDOWN
1. 0.6D - 0.6W 1. D + 0.6W
2. (0.6 - 0.14Sds)D - 0.7ρE 2. D + 0.75(L + Lr + 0.6W)
3. D + 0.75(L + S + 0.6W)
4. (1+0.105Sds)D + 0.75(L + S + 0.7ρE)
5. (1+0.14Sds)D + 0.7ρE
B . S HE A R W A LL S C HE DU LE (De si g n C o d e : 2022 C B C )B . S HE A R W A LL S C HE DU L E (De si g n C o d e : 2022 C B C )
P a ne lPanel
T yp eType S he a t hi ngSheathing E d g eEdge
N a i lNail
F i e l dField
N a i lNail S he a r C l i pShear C l i p
S i l l p l a t e a t ta c hm e ntSill p l a t e a t t a c hm e nt GaGa
(k /i n)(k /i n)
S e i sm i cSeismic
A l l o wa b l e (p l f )A l l o wa b l e (p l f )
W i ndWind
A l l o wa b l e (p l f )A l l o wa b l e (p l f )Framed Floor Concrete
1 3/8" Sheathing 8d @ 6 8d @ 12 A35 @ 24 16d Nails @ 6 5/8 x 10 @
48 13 260 364
2 3/8" Sheathing 8d @ 4 8d @ 12 A35 @ 16 16d Nails @ 4 5/8 x 10 @
42 19 380 532
3 3/8" Sheathing 8d @ 3 8d @ 12 A35 @ 8 16d Nails @ 3 5/8 x 10 @
36 25 490 686
4 3/8" Sheathing 8d @ 2 8d @ 12 A35 @ 8 16d Nails @ 2 5/8 x 10 @
24 39 640 896
5 15/32" Structural
I 10d @ 2 10d @ 12 A35 @ 6 (2) Rows Stagg, 16d Nails @
3
5/8 x 10 @
18 51 870 1218
3D 3/8" Sheathing 8d @ 3 8d @ 12 (Both Sides)A35 @
8 SDS1/4x6 @ 4 5/8 x 12 @
22 50 980 1372
4D 3/8" Sheathing 8d @ 2 8d @ 12 (Both Sides)A35 @
8 SDS1/4x6 @ 3 5/8 x 12 @
16 78 1280 1792
5D 15/32" Structural
I 10d @ 2 10d @ 12 (Both Sides)A35 @
6 SDS1/4x6 @ 2 5/8 x 12 @ 8 102 1740 2436
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
11
S W _LI N E ASW_L I N E A 1 st F l o o r1st F l o o r De si g n O KDesign O K
Drection W-E ρ = 1 .3ρ = 1 .3
Total Length (ft): 33.00 Total panel Length (ft): 8.00
A p p l i e d Lo a d sApplied Lo a d s
DIAPHRAGM D1 (W-E)_ROOF (Span=32.5ft): W=941 LB, E=735 LB
DIAPHRAGM D3 (W-E)_ROOF (Span=12.5ft): W=544 LB, E=456 LB
Strap Shear panel
DE S IGN S U M M A R YDESIGN S U M M A R Y
S he a r & De f l e ct i o n:S he a r & De f l e ct i o n:U S E P A N E L TY P E 1USE P A N E L T Y P E 1
Maximum shear check at Panel P1 Height H = 8.00 ft Width W = 8.00 ft
Max. wind shear = 186 plf Allowable Wind = 364 plf Ratio = 5151 %
Max. seismic shear = 194 plf Allowable Seismic = 260 plf Ratio = 7 575 %
Max. Deflection = 0.914 in at Panel P1 Allowable Deflection = 1.920 in Ratio = 4848 %
O ve r tur ni ng c a l cul a t i o nOverturning c a l cul a t i o n
P a ne lPanel W i d t hWidth
(f t)(f t )
N e tNet
He i g htHeight
(f t )(f t )
R e a ct i o n (L B )R e a c ti o n (LB )A p p l i e dApplied
U p l i f t /Do wnUplift/Do wn
(LB )(L B )
Ho l d d o wn/P o stHolddown/P o st
A l l o wa b l eAllowable
U p l i f t/Do wnUplift/Do wn
(LB )(LB )
R a t i oRatio
U p l i f t /Do wnUplift/Do wnLoc.L o c .DDu pup DDd o w ndown LL LrLr SS WW EE
P1 8.00 8.00 LE 544 181 0 0 0 1541 1236 1362/1815 HDU2/4X4 3075/7656 0.44/0.24
RE 544 181 0 0 0 1541 1236 1362/1815 HDU2/4X4 3075/7656 0.44/0.24
Dup: us e d for upl ift force cal cul at ion Ddow n: used for down force cal cul at ion LE: l e ft e dge of s he arwall R E : right e dge of s he arwall
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
12
S W _LI N E BSW_L I N E B 1 st F l o o r1st F l o o r De si g n O KDesign O K
Drection W-E ρ = 1 .3ρ = 1 .3
Total Length (ft): 25.00 Total panel Length (ft): 3.00
A p p l i e d Lo a d sApplied Lo a d s
DIAPHRAGM D2 (W-E)_ROOF (Span=15ft): W=434 LB, E=149 LB
Strap Shear panel
DE S IGN S U M M A R YDESIGN S U M M A R Y
S he a r & De f l e ct i o n:S he a r & De f l e ct i o n:U S E P A N E L TY P E 1USE P A N E L T Y P E 1
Maximum shear check at Panel P1 Height H = 8.00 ft Width W = 3.00 ft
Max. wind shear = 145 plf Allowable Wind = 334 plf Ratio = 4343 %
Max. seismic shear = 65 plf Allowable Seismic = 238 plf (Adjusted by 1.25-0.125h/bs)Ratio = 2727 %
Max. Deflection = 1.052 in at Panel P1 Allowable Deflection = 1.920 in Ratio = 5555 %
O ve r tur ni ng c a l cul a t i o nOverturning c a l cul a t i o n
P a ne lPanel W i d t hWidth
(f t)(f t )
N e tNet
He i g htHeight
(f t )(f t )
R e a ct i o n (L B )R e a c ti o n (LB )A p p l i e dApplied
U p l i f t /Do wnUplift/Do wn
(LB )(L B )
Ho l d d o wn/P o stHolddown/P o st
A l l o wa b l eAllowable
U p l i f t/Do wnUplift/Do wn
(LB )(LB )
R a t i oRatio
U p l i f t /Do wnUplift/Do wnLoc.L o c .DDu pup DDd o w ndown LL LrLr SS WW EE
P1 3.00 8.00
LE 204 181 0 0 0 1283 440 1161/1464 HDU2/4X4 3075/7656 0.38/0.19
RE 204 181 0 0 0 1283 440 1161/1464 HDU2/4X4 3075/7656 0.38/0.19
Dup: us e d for upl ift force cal cul at ion Ddow n: used for down force cal cul at ion LE: l e ft e dge of s he arwall R E : right e dge of s he arwall
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
13
S W _LI N E CSW_L I N E C 1 st F l o o r1st F l o o r De si g n O KDesign O K
Drection W-E ρ = 1 .3ρ = 1 .3
Total Length (ft): 25.00 Total panel Length (ft): 8.00
A p p l i e d Lo a d sApplied Lo a d s
DIAPHRAGM D1 (W-E)_ROOF (Span=32.5ft): W=941 LB, E=735 LB
DIAPHRAGM D2 (W-E)_ROOF (Span=15ft): W=434 LB, E=149 LB
Strap Shear panel
DE S IGN S U M M A R YDESIGN S U M M A R Y
S he a r & De f l e ct i o n:S he a r & De f l e ct i o n:U S E P A N E L TY P E 1USE P A N E L T Y P E 1
Maximum shear check at Panel P1 Height H = 8.00 ft Width W = 8.00 ft
Max. wind shear = 172 plf Allowable Wind = 364 plf Ratio = 4747 %
Max. seismic shear = 144 plf Allowable Seismic = 260 plf Ratio = 5555 %
Max. Deflection = 0.794 in at Panel P1 Allowable Deflection = 1.920 in Ratio = 4141 %
O ve r tur ni ng c a l cul a t i o nOverturning c a l cul a t i o n
P a ne lPanel W i d t hWidth
(f t)(f t )
N e tNet
He i g htHeight
(f t )(f t )
R e a ct i o n (L B )R e a c ti o n (LB )A p p l i e dApplied
U p l i f t /Do wnUplift/Do wn
(LB )(L B )
Ho l d d o wn/P o stHolddown/P o st
A l l o wa b l eAllowable
U p l i f t/Do wnUplift/Do wn
(LB )(LB )
R a t i oRatio
U p l i f t /Do wnUplift/Do wnLoc.L o c .DDu pup DDd o w ndown LL LrLr SS WW EE
P1 8.00 8.00 LE 544 181 0 0 0 1428 918 1101/1609 HDU2/4X4 3075/7656 0.36/0.21
RE 544 181 0 0 0 1428 918 1101/1609 HDU2/4X4 3075/7656 0.36/0.21
Dup: us e d for upl ift force cal cul at ion Ddow n: used for down force cal cul at ion LE: l e ft e dge of s he arwall R E : right e dge of s he arwall
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
14
S W _LI N E 1SW_L I N E 1 1 st F l o o r1st F l o o r De si g n O KDesign O K
Drection S-N ρ = 1 .3ρ = 1 .3
Total Length (ft): 15.00 Total panel Length (ft): 4.00
A p p l i e d Lo a d sApplied Lo a d s
DIAPHRAGM D2 (S-N)_ROOF (Span=7ft): W=198 LB, E=145 LB
Strap Shear panel
DE S IGN S U M M A R YDESIGN S U M M A R Y
S he a r & De f l e ct i o n:S he a r & De f l e ct i o n:U S E P A N E L TY P E 1USE P A N E L T Y P E 1
Maximum shear check at Panel P1 Height H = 8.00 ft Width W = 4.00 ft
Max. wind shear = 50 plf Allowable Wind = 364 plf Ratio = 1 414 %
Max. seismic shear = 47 plf Allowable Seismic = 260 plf Ratio = 1 818 %
Max. Deflection = 0.277 in at Panel P1 Allowable Deflection = 1.920 in Ratio = 1 414 %
O ve r tur ni ng c a l cul a t i o nOverturning c a l cul a t i o n
P a ne lPanel W i d t hWidth
(f t)(f t )
N e tNet
He i g htHeight
(f t )(f t )
R e a ct i o n (L B )R e a c ti o n (LB )A p p l i e dApplied
U p l i f t /Do wnUplift/Do wn
(LB )(L B )
Ho l d d o wn/P o stHolddown/P o st
A l l o wa b l eAllowable
U p l i f t/Do wnUplift/Do wn
(LB )(LB )
R a t i oRatio
U p l i f t /Do wnUplift/Do wnLoc.Lo c .DDu pup DDd o w ndown LL LrLr SS WW EE
P1 4.00 8.00
LE 272 181 0 0 0 428 313 285/615 HDU2/4X4 3075/7656 0.09/0.08
RE 272 181 0 0 0 428 313 285/615 HDU2/4X4 3075/7656 0.09/0.08
Dup: us e d for upl ift force cal cul at ion Ddow n: used for down force cal cul at ion LE: l e ft e dge of s he arwall R E : right e dge of s he arwall
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
15
S W _LI N E 2SW_L I N E 2 1 st F l o o r1st F l o o r De si g n O KDesign O K
Drection S-N ρ = 1 .3ρ = 1 .3
Total Length (ft): 32.00 Total panel Length (ft): 4.00
A p p l i e d Lo a d sApplied Lo a d s
DIAPHRAGM D1 (S-N)_ROOF (Span=18ft): W=510 LB, E=668 LB
DIAPHRAGM D2 (S-N)_ROOF (Span=7ft): W=198 LB, E=145 LB
Strap Shear panel
DE S IGN S U M M A R YDESIGN S U M M A R Y
S he a r & De f l e ct i o n:S he a r & De f l e ct i o n:U S E P A N E L TY P E 2USE P A N E L T Y P E 2
Maximum shear check at Panel P1 Height H = 8.00 ft Width W = 4.00 ft
Max. wind shear = 177 plf Allowable Wind = 532 plf Ratio = 3333 %
Max. seismic shear = 264 plf Allowable Seismic = 380 plf Ratio = 6969 %
Max. Deflection = 1.392 in at Panel P1 Allowable Deflection = 1.920 in Ratio = 7 272 %
O ve r tur ni ng c a l cul a t i o nOverturning c a l cul a t i o n
P a ne lPanel W i d t hWidth
(f t)(f t )
N e tNet
He i g htHeight
(f t )(f t )
R e a ct i o n (L B )R e a c ti o n (LB )A p p l i e dApplied
U p l i f t /Do wnUplift/Do wn
(LB )(L B )
Ho l d d o wn/P o stHolddown/P o st
A l l o wa b l eAllowable
U p l i f t/Do wnUplift/Do wn
(LB )(LB )
R a t i oRatio
U p l i f t /Do wnUplift/Do wnLoc.L o c .DDu pup DDd o w ndown LL LrLr SS WW EE
P1 4.00 8.00 LE 272 181 0 0 0 1530 1754 2158/2488 HDU2/4X4 3075/7656 0.70/0.32
RE 272 181 0 0 0 1530 1754 2158/2488 HDU2/4X4 3075/7656 0.70/0.32
Dup: us e d for upl ift force cal cul at ion Ddow n: used for down force cal cul at ion LE: l e ft e dge of s he arwall R E : right e dge of s he arwall
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
16
S W _LI N E 3SW_L I N E 3 1 st F l o o r1st F l o o r De si g n O KDesign O K
Drection S-N ρ = 1 .3ρ = 1 .3
Total Length (ft): 32.00 Total panel Length (ft): 8.00
A p p l i e d Lo a d sApplied Lo a d s
DIAPHRAGM D1 (S-N)_ROOF (Span=18ft): W=510 LB, E=668 LB
Strap Shear panel
DE S IGN S U M M A R YDESIGN S U M M A R Y
S he a r & De f l e ct i o n:S he a r & De f l e ct i o n:U S E P A N E L TY P E 1USE P A N E L T Y P E 1
Maximum shear check at Panel P1 Height H = 8.00 ft Width W = 8.00 ft
Max. wind shear = 64 plf Allowable Wind = 364 plf Ratio = 1 818 %
Max. seismic shear = 109 plf Allowable Seismic = 260 plf Ratio = 4242 %
Max. Deflection = 0.495 in at Panel P1 Allowable Deflection = 1.920 in Ratio = 2626 %
O ve r tur ni ng c a l cul a t i o nOverturning c a l cul a t i o n
P a ne lPanel W i d t hWidth
(f t)(f t )
N e tNet
He i g htHeight
(f t )(f t )
R e a ct i o n (L B )R e a c ti o n (LB )A p p l i e dApplied
U p l i f t /Do wnUplift/Do wn
(LB )(L B )
Ho l d d o wn/P o stHolddown/P o st
A l l o wa b l eAllowable
U p l i f t/Do wnUplift/Do wn
(LB )(LB )
R a t i oRatio
U p l i f t /Do wnUplift/Do wnLoc.Lo c .DDu pup DDd o w ndown LL LrLr SS WW EE
P1 8.00 8.00
LE 544 181 0 0 0 530 693 656/1109 HDU2/4X4 3075/7656 0.21/0.14
RE 544 181 0 0 0 530 693 656/1109 HDU2/4X4 3075/7656 0.21/0.14
Dup: us e d for upl ift force cal cul at ion Ddow n: used for down force cal cul at ion LE: l e ft e dge of s he arwall R E : right e dge of s he arwall
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
17
M a t e r ia l p r o p e r t i e s :M a t e r ia l p r o p e r t i e s :
F b(+)/Fb (-) (p si): 900/900 Ig nore shear wit hin (d): Yes
F v (p si): 180 Rep et it ive m em ber : Yes
E (ps i): 1600000 B eam B racing: Yes
A p p li e d L o a d s :A p p li e d L o a d s :
R o o f: D = 1 5, L r = 20 p sf, fro m : 0 --> 9 ft, Trib W id th = 1 .33 ft
2 x 8 -D o u g la s F i r -L a r c h N o .22x8-D o u g la s F i r -L a r c h N o .2
Deflect ion
M oment
Shear
D E S I G N S U M M A R YDESIGN S U M M A R Y
A p p li e d F a c t o r s :A p p li e d F a c t o r s :
Ct = 1, Cm = 1, CL = 1.00, CF = 1.2, Cfu = 1, Ci = 1, Cr = 1.15
C o d e c h e c k : C o d e c h e c k : D e s ig n O KDesign O K
M ax. B ending R at io:2 9 %2 9 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Mo m ent :4.5 ft
A pp lied M oment:497 lb -ft
A llowab le Mo m ent :1700 lb -ft
M ax. Shear Ratio :1 2 %1 2 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Shear:0 ft
A pp lied Shear:190 lb
A llowab le Shear:1631 lb
M ax. Live Deflect ion:1 7 %1 7 %
Lo ad Co m binatio n:Lr
Lo catio n o f M ax. Deflectio n;4.5 ft
A pp lied Deflect ion:0.052 in
A llowab le Deflectio n:0.3 in
M ax. To t al Deflectio n:2 1 %2 1 %
Lo ad Co m binatio n:D + Lr
Lo catio n o f M ax. Deflectio n:4.5 ft
A pp lied Deflect ion:0.095 in
A llowab le Deflectio n:0.45 in
R e a c t io n s (lb ):R e a c t io n s (lb ):
Sup p .D L Lr S W S N W W E ESN EW E
M ax. LC
(Do wn/U p )
1 101 0 120 0 0 0 0 0 221/0
2 101 0 120 0 0 0 0 0 221/0
B E A M I DBEAM I D : 1: 1 Des crip t ion: R after R1
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
18
M a t e r ia l p r o p e r t i e s :M a t e r ia l p r o p e r t i e s :
F b(+)/Fb (-) (p si): 900/900 Ig nore shear wit hin (d): Yes
F v (p si): 180 Rep et it ive m em ber : Yes
E (ps i): 1600000 B eam B racing: Yes
A p p li e d L o a d s :A p p li e d L o a d s :
Ceiling : D = 8, L = 1 0 p sf, fro m: 0 --> 1 7.5 ft, Trib W id th = 1 .33 ft
2 x 1 0 -D o u g l a s F ir -L a r c h N o .22x10-D o u g la s F i r -L a r c h N o .2
Deflect ion
M oment
Shear
D E S I G N S U M M A R YDESIGN S U M M A R Y
A p p li e d F a c t o r s :A p p li e d F a c t o r s :
Ct = 1, Cm = 1, CL = 1.00, CF = 1.1, Cfu = 1, Ci = 1, Cr = 1.15
C o d e c h e c k : C o d e c h e c k : D e s ig n O KDesign O K
M ax. B ending R at io:5 1 %5 1 %
Lo ad Co m binatio n:D + L
Lo ad Durat ion CD:1
Lo catio n o f M ax. Mo m ent :8.75 ft
A pp lied M oment:1041 lb -ft
A llowab le Mo m ent :2029 lb -ft
M ax. Shear Ratio :1 3 %1 3 %
Lo ad Co m binatio n:D + L
Lo ad Durat ion CD:1
Lo catio n o f M ax. Shear:17.5 ft
A pp lied Shear:218 lb
A llowab le Shear:1665 lb
M ax. Live Deflect ion:3 0 %3 0 %
Lo ad Co m binatio n:L
Lo catio n o f M ax. Deflectio n;8.75 ft
A pp lied Deflect ion:0.177 in
A llowab le Deflectio n:0.583 in
M ax. To t al Deflectio n:4 1 %4 1 %
Lo ad Co m binatio n:D + L
Lo catio n o f M ax. Deflectio n:8.75 ft
A pp lied Deflect ion:0.363 in
A llowab le Deflectio n:0.875 in
R e a c t io n s (lb ):R e a c t io n s (lb ):
Sup p .D L Lr S W S N W W E ESN EW E
M ax. LC
(Do wn/U p )
1 122 116 0 0 0 0 0 0 238/0
2 122 116 0 0 0 0 0 0 238/0
B E A M I DBEAM I D : 2: 2 Des crip t ion: Cl'g jo ists CJ
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
19
M a t e r ia l p r o p e r t i e s :M a t e r ia l p r o p e r t i e s :
F b(+)/Fb (-) (p si): 900/900 Ig nore shear wit hin (d): Yes
F v (p si): 180 Rep et it ive m em ber : N o
E (ps i): 1600000 B eam B racing: Yes
A p p li e d L o a d s :A p p li e d L o a d s :
R o o f: D = 1 5, L r = 20 p sf, fro m : 0 --> 1 2 ft, Trib W id th = 8 --> 1 ft
4 x 1 0 -D o u g l a s F ir -L a r c h N o .24x10-D o u g la s F i r -L a r c h N o .2
Deflect ion
M oment
Shear
D E S I G N S U M M A R YDESIGN S U M M A R Y
A p p li e d F a c t o r s :A p p li e d F a c t o r s :
Ct = 1, Cm = 1, CL = 1.00, CF = 1.2, Cfu = 1, Ci = 1, Cr = 1
C o d e c h e c k : C o d e c h e c k : D e s ig n O KDesign O K
M ax. B ending R at io:5 4 %5 4 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Mo m ent :5.28 ft
A pp lied M oment:3016 lb -ft
A llowab le Mo m ent :5615 lb -ft
M ax. Shear Ratio :2 1 %2 1 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Shear:0 ft
A pp lied Shear:1016 lb
A llowab le Shear:4856 lb
M ax. Live Deflect ion:2 9 %2 9 %
Lo ad Co m binatio n:Lr
Lo catio n o f M ax. Deflectio n;5.76 ft
A pp lied Deflect ion:0.114 in
A llowab le Deflectio n:0.4 in
M ax. To t al Deflectio n:3 5 %3 5 %
Lo ad Co m binatio n:D + Lr
Lo catio n o f M ax. Deflectio n:5.88 ft
A pp lied Deflect ion:0.209 in
A llowab le Deflectio n:0.6 in
R e a c t io n s (lb ):R e a c t io n s (lb ):
Sup p .D L Lr S W S N W W E ESN EW E
M ax. LC
(Do wn/U p )
1 556 0 680 0 0 0 0 0 1236/0
2 346 0 400 0 0 0 0 0 746/0
B E A M I DBEAM I D : 3: 3 Des crip t ion: HIP B M
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
20
M a t e r ia l p r o p e r t i e s :M a t e r ia l p r o p e r t i e s :
F b(+)/Fb (-) (p si): 3100/3100 Ig nore shear wit hin (d): Yes
F v (p si): 285 Rep et it ive m em ber : N o
E (ps i): 2000000 B eam B racing: Yes
A p p li e d L o a d s :A p p li e d L o a d s :
PO IN T Sup p . 1 o f Beam 3 @ 8.5ft, (D =556 L r=680)
PO IN T Sup p . 1 o f Beam 3 @ 8.5ft, (D =556 L r=680)
P o int Load
3 1 /2 x 1 1 1 /4 -V e r s a L a m 3 1 0 03 1 /2 x 1 1 1 /4 -V e r s a L a m 3 1 0 0
Deflect ion
M oment
Shear
D E S I G N S U M M A R YDESIGN S U M M A R Y
A p p li e d F a c t o r s :A p p li e d F a c t o r s :
Ct = 1, Cm = 1, CL = 1.00, Cr = 1, Cv = 1.01
C o d e c h e c k : C o d e c h e c k : D e s ig n O KDesign O K
M ax. B ending R at io:4 7 %4 7 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Mo m ent :8.5 ft
A pp lied M oment:11155 lb -ft
A llowab le Mo m ent :23840 lb -ft
M ax. Shear Ratio :1 4 %1 4 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Shear:0 ft
A pp lied Shear:1352 lb
A llowab le Shear:9352 lb
M ax. Live Deflect ion:5 4 %5 4 %
Lo ad Co m binatio n:Lr
Lo catio n o f M ax. Deflectio n;8.75 ft
A pp lied Deflect ion:0.316 in
A llowab le Deflectio n:0.583 in
M ax. To t al Deflectio n:6 8 %6 8 %
Lo ad Co m binatio n:D + Lr
Lo catio n o f M ax. Deflectio n:8.75 ft
A pp lied Deflect ion:0.597 in
A llowab le Deflectio n:0.875 in
R e a c t io n s (lb ):R e a c t io n s (lb ):
Sup p .D L Lr S W S N W W E ESN EW E
M ax. LC
(Do wn/U p )
1 652 0 699 0 0 0 0 0 1352/0
2 620 0 661 0 0 0 0 0 1281/0
B E A M I DBEAM I D : 4: 4 Des crip t ion: Cl'g B m
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
21
M a t e r ia l p r o p e r t i e s :M a t e r ia l p r o p e r t i e s :
F b(+)/Fb (-) (p si): 900/900 Ig nore shear wit hin (d): Yes
F v (p si): 180 Rep et it ive m em ber : N o
E (ps i): 1600000 B eam B racing: N o
A p p li e d L o a d s :A p p li e d L o a d s :
R o o f: D = 1 5, L r = 20 p sf, fro m : 0 --> 6.25 ft, Trib W id th = 5 --> 2.5 ft
E-W all: D = 1 7 p sf, fro m: 0 --> 6.25 ft, H eig ht = 2 ft
PO IN T Sup p . 2 o f Beam 4 @ 0.6ft, (D =620 L r=661 )
P o int Load
4 x 8 -D o u g la s F i r -L a r c h N o .24x8-D o u g la s F i r -L a r c h N o .2
Deflect ion
M oment
Shear
D E S I G N S U M M A R YDESIGN S U M M A R Y
A p p li e d F a c t o r s :A p p li e d F a c t o r s :
Ct = 1, Cm = 1, CL = 0.99, CF = 1.3, Cfu = 1, Ci = 1, Cr = 1, CT = 1
C o d e c h e c k : C o d e c h e c k : D e s ig n O KDesign O K
M ax. B ending R at io:3 5 %3 5 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Mo m ent :2.31 ft
A pp lied M oment:1281 lb -ft
A llowab le Mo m ent :3697 lb -ft
M ax. Shear Ratio :4 2 %4 2 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Shear:0 ft
A pp lied Shear:1605 lb
A llowab le Shear:3806 lb
M ax. Live Deflect ion:1 2 %1 2 %
Lo ad Co m binatio n:Lr
Lo catio n o f M ax. Deflectio n;2.94 ft
A pp lied Deflect ion:0.024 in
A llowab le Deflectio n:0.208 in
M ax. To t al Deflectio n:1 6 %1 6 %
Lo ad Co m binatio n:D + Lr
Lo catio n o f M ax. Deflectio n:2.94 ft
A pp lied Deflect ion:0.051 in
A llowab le Deflectio n:0.312 in
R e a c t io n s (lb ):R e a c t io n s (lb ):
Sup p .D L Lr S W S N W W E ESN EW E
M ax. LC
(Do wn/U p )
1 881 0 858 0 0 0 0 0 1739/0
2 341 0 272 0 0 0 0 0 612/0
B E A M I DBEAM I D : 5: 5 Des crip t ion: Hd r
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
22
M a t e r ia l p r o p e r t i e s :M a t e r ia l p r o p e r t i e s :
F b(+)/Fb (-) (p si): 900/900 Ig nore shear wit hin (d): Yes
F v (p si): 180 Rep et it ive m em ber : N o
E (ps i): 1600000 B eam B racing: Yes
A p p li e d L o a d s :A p p li e d L o a d s :
R o o f: D = 1 5, L r = 20 p sf, fro m : 0 --> 1 0 ft, Trib W id th = 7 --> 1 ft
4 x 1 0 -D o u g l a s F ir -L a r c h N o .24x10-D o u g la s F i r -L a r c h N o .2
Deflect ion
M oment
Shear
D E S I G N S U M M A R YDESIGN S U M M A R Y
A p p li e d F a c t o r s :A p p li e d F a c t o r s :
Ct = 1, Cm = 1, CL = 1.00, CF = 1.2, Cfu = 1, Ci = 1, Cr = 1, CT = 1
C o d e c h e c k : C o d e c h e c k : D e s ig n O KDesign O K
M ax. B ending R at io:3 3 %3 3 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Mo m ent :4.4 ft
A pp lied M oment:1870 lb -ft
A llowab le Mo m ent :5615 lb -ft
M ax. Shear Ratio :1 5 %1 5 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Shear:0 ft
A pp lied Shear:723 lb
A llowab le Shear:4856 lb
M ax. Live Deflect ion:1 5 %1 5 %
Lo ad Co m binatio n:Lr
Lo catio n o f M ax. Deflectio n;4.9 ft
A pp lied Deflect ion:0.049 in
A llowab le Deflectio n:0.333 in
M ax. To t al Deflectio n:1 8 %1 8 %
Lo ad Co m binatio n:D + Lr
Lo catio n o f M ax. Deflectio n:4.9 ft
A pp lied Deflect ion:0.090 in
A llowab le Deflectio n:0.5 in
R e a c t io n s (lb ):R e a c t io n s (lb ):
Sup p .D L Lr S W S N W W E ESN EW E
M ax. LC
(Do wn/U p )
1 413 0 500 0 0 0 0 0 913/0
2 263 0 300 0 0 0 0 0 563/0
B E A M I DBEAM I D : 6: 6 Des crip t ion: HIP B M
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
23
M a t e r ia l p r o p e r t i e s :M a t e r ia l p r o p e r t i e s :
F b(+)/Fb (-) (p si): 3100/3100 Ig nore shear wit hin (d): Yes
F v (p si): 285 Rep et it ive m em ber : N o
E (ps i): 2000000 B eam B racing: Yes
A p p li e d L o a d s :A p p li e d L o a d s :
R o o f: D = 1 5, L r = 20 p sf, fro m : 0 --> 5 ft, Trib W id th = 9 ft
R o o f: D = 1 5, L r = 20 p sf, fro m : 5 --> 1 4.25 ft, Trib W id th = 5 --> 1 ft
Ceiling : D = 8, L = 1 0 p sf, fro m: 0 --> 1 4.25 ft, Trib W id th = 3.5 ft
PO IN T Sup p . 1 o f Beam 6 @ 7ft, (D =41 3 L r=500)
PO IN T Sup p . 1 o f Beam 6 @ 7ft, (D =41 3 L r=500)
PO IN T Sup p . 1 o f Beam 4 @ 5ft, (D =652 L r=699)
PO IN T Sup p . 2 o f Beam 3 @ 1 3.75ft, (D =346 L r=400)
P o int Load
3 1 /2 x 1 1 1 /4 -V e r s a L a m 3 1 0 03 1 /2 x 1 1 1 /4 -V e r s a L a m 3 1 0 0
Deflect ion
M oment
Shear
D E S I G N S U M M A R YDESIGN S U M M A R Y
A p p li e d F a c t o r s :A p p li e d F a c t o r s :
Ct = 1, Cm = 1, CL = 1.00, Cr = 1, Cv = 1.01, CT = 1
C o d e c h e c k : C o d e c h e c k : D e s ig n O KDesign O K
M ax. B ending R at io:6 5 %6 5 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Mo m ent :7 ft
A pp lied M oment:15439 lb -ft
A llowab le Mo m ent :23840 lb -ft
M ax. Shear Ratio :3 8 %3 8 %
Lo ad Co m binatio n:D + Lr
Lo ad Durat ion CD:1.25
Lo catio n o f M ax. Shear:0 ft
A pp lied Shear:3555 lb
A llowab le Shear:9352 lb
M ax. Live Deflect ion:6 7 %6 7 %
Lo ad Co m binatio n:Lr
Lo catio n o f M ax. Deflectio n;6.84 ft
A pp lied Deflect ion:0.319 in
A llowab le Deflectio n:0.475 in
M ax. To t al Deflectio n:6 6 %6 6 %
Lo ad Co m binatio n:D + Lr
Lo catio n o f M ax. Deflectio n:6.84 ft
A pp lied Deflect ion:0.624 in
A llowab le Deflectio n:0.95 in
R e a c t io n s (lb ):R e a c t io n s (lb ):
Sup p .D L Lr S W S N W W E ESN EW E
M ax. LC
(Do wn/U p )
1 1843 249 1939 0 0 0 0 0 3782/0
2 1603 249 1615 0 0 0 0 0 3218/0
B E A M I DBEAM I D : 7: 7 Des crip t ion: Cl'g B m
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Prin t date : 0 7/11/2 0 2 5
24
Project:
Location: CT1
page
of
StruCalc 9.0
StruCalc Version 10.0.1.5 7/11/2025 2:54:43 PM
Collar Tie
1.5 IN x 7.25 IN x 9.5 FT (9 + 0.5) @ 16 O.C.
#2 - Douglas-Fir-Larch - Dry Use
1.5 x 9.25 Solid Sawn Lumber with minimum Ft = 575
DEFLECTIONS
Live Load
Dead Load
Total Load
Live Load Deflection Criteria: L/240 Total Load Deflection Criteria: L/180
0.06
0.04
0.10
IN L/1953
in
IN L/1116
Center
-0.01
-0.01
-0.02
IN 2L/1214
in
IN 2L/694
Right
RAFTER REACTIONS
Lower Live Load @ A & B
Lower Dead Load @ A & B
Lower Total Load @ A & B
Collar Tie Tension
LOADS
196
147
343
plf
plf
plf
REACTIONS
261
196
457
865
lb
lb
lb
lb
RAFTER SUPPORT DATA
Bearing Length
B
0.49 in
RAFTER DATA
Span Length
Unbraced Length-Bottom
Rafter Pitch
Collar Tie Location
Roof Duration Factor
Peak Notch Depth
Base Notch Depth
9
9.28
3
2.49
1.25
0.00
0.00
ft
ft
Interior
:12
ft
0.5
0.52
ft
ft
Eave
MATERIAL PROPERTIES
Bending Stress:
Shear Stress:
Modulus of Elasticity:
Comp. ┴ to Grain:
Controlling Moment:
4.501 Ft from left support of span 2 (Center Span)
Created by combining all dead loads and live loads on span(s) 2
Controlling Shear:
8.731 Ft from left support of span 2 (Center Span)
Created by combining all dead loads and live loads on span(s) 2, 3
Comparisons with required sections:
Section Modulus:
Area (Shear):
Moment of Inertia (deflection):
Moment:
Shear:
Fb =
Cd=1.25 CF=1.20 Cr=1.15
Fv =
Cd=1.25
E =
Fc - ┴ =
486 ft-lb
-420 lb
900
180
1600
625
psi
psi
ksi
psi
Base Values
Fb' =
Fv' =
E' =
Fc - ┴' =
1553
225
1600
625
psi
psi
ksi
psi
Adjusted
3.75
2.8
12.36
486
-420
in3
in2
in4
ft-lb
lb
Req'd
13.14
10.88
47.63
1700
1631
in3
in2
in4
ft-lb
lb
Provided
RAFTER LOADING
Uniform Floor Loading
Roof Live Load:
Roof Dead Load:
Non-Snow Roof Loaded Area:
Slope Adjusted Spans And Loads
Interior Span:
Eave Span:
Rafter Live Load:
Eave Live Load:
Rafter Dead Load:
Rafter Total Load:
Eave Total Load:
LL =
DL =
RLA =
L-adj =
L-Eave-adj =
wL-adj =
wL-Eave-adj =
wD-adj =
wT-adj =
wT-Eave-adj =
20
15
0
9.28
0.52
25
25
19
45
45
psf
psf
sf
ft
ft
plf
plf
plf
plf
plf
LOADING DIAGRAM
0.5 ft 9 ft
2.49 ft
18 ft
0.39 ft
COLLAR TIE DESIGN
1.5 x 9.25 Solid Sawn Lumber with minimum Ft = 575
Tension Parallel to Grain
Collar Tie Location
Collar Tie Tension
Collar Tie Capacity
Nailing Required @ Both Ends
16d Common
16d Sinker
16d Box
Ft =
Cd=1.25 Cf=0.00
575
2.49
865
14959
5 Nails
6 Nails
7 Nails
psi
ft
lb
lb
Base Values
Ft' = 1078 psi
Adjusted
25
Project:
Location: CT1
page
of
StruCalc 9.0
StruCalc Version 10.0.1.5 7/11/2025 2:54:44 PM
Collar Tie
1.5 IN x 7.25 IN x 9.5 FT (9 + 0.5) @ 16 O.C.
#2 - Douglas-Fir-Larch - Dry Use
1.5 x 9.25 Solid Sawn Lumber with minimum Ft = 575
LOADING DIAGRAM
0.5 ft 9 ft
2.49 ft
18 ft
0.39 ft
VMD DIAGRAM
A B9 ft 0.5 ft
500
250
0
-250
-500
Shear (lbs)
209 lbs @ 0 ft
-420 lbs @ 9 ft
500
250
0
-250
-500
Moment (ft-lb)
486 ft-lbs @ 4 ft
-3 ft-lbs @ 9 ft
-0.1
-0.05
0
0.05
0.1
Deflection (in)
-0.018 in @ 9.5 ft
0.1 in @ 4.5 ft
26
Weight of Footing
Roof
E-Wall
Weight of Footing
Weight of Pad
POINT
E-Wall
P a d /F o o t i ng IDPad/F o o t i ng I D : 1: 1 Description: FOOTING DESIGN
Soil Bearing: SB = 1500 PSF Post with parallel to footing: Bp = 3.5 in
Lo a d i ng :Lo a d i ng :
300.00 PLF = 150 x 1.00' x 2.00'
D = 15, Lr = 20 psf, Trib Width = 10 ft
D = 17 psf, Height = 8 ft
F o o t i ng C he c k:F o o t i ng C he c k :
Total Weight: Wto t al = 786 PLF
Footing Width Required: Bf = Wt otal / SB = 786/1500 x 12 = 6.29 in
U S E 1 2" W I DE X 24" DE E P C o nt i nuo us F o o t i ng wi t h #4 C o nt . @ T & B (U .N .O )U S E 1 2 " W I DE X 2 4" DE E P C o nt i nuo us F o o t i ng wi t h #4 C o nt . @ T & B (U .N .O )
P a d /F o o t i ng IDPad/F o o t i ng I D : 2: 2 Description: BM 7 (1)
Soil Bearing: SB = 1500 PSF Post with parallel to footing: Bp = 3.5 in
Lo a d i ng :Lo a d i ng :
300.00 PLF = 150 x 1.00' x 2.00'
1200.00 LB = 150 x 2.00' x 2.00' x 2.00'
From Support 1 of Beam 7 (4031LB)
D = 17 psf, Height = 8 ft
F o o t i ng C he c k:F o o t i ng C he c k :
Total Weight: Wto t al = 436 PLF
Footing Width Required: Bf = Wt otal / SB = 436/1500 x 12 = 3.49 in
U S E 1 2" W I DE X 24" DE E P C o nt i nuo us F o o t i ng wi t h #4 C o nt . @ T & B (U .N .O )U S E 1 2 " W I DE X 2 4" DE E P C o nt i nuo us F o o t i ng wi t h #4 C o nt . @ T & B (U .N .O )
P a d C he c k:P a d C he c k :
Total Point Load (Pt otal) = 5231 LB
Footing Length to check point load L = 3.5 + 2 x (24 + 6) = 63.50 in
Footing Width B = 12 in
Capacity of Point Load on Footing: Pcap = (SB x L x B) / 144 = 7937.50 LB
Allowable Point Load on Footing: Pallo w= Pcap - (Wt otal x L / 12) = 5630.33 LB >= Ptotal
N O P A D I S N E E D !N O P A D I S N E E D !
:
:
P r oje ct N o.A DU C ON V E R SI O N
P r oje ct Location 8 0 5 C LE M E N SE N A V E SA N T A A N A C A 9 2 70 5
:
:
De sign e d
C h e c ke d
Pr in t date : 0 7/11/2 0 2 5
27
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
0
2
P
M
A01
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
COVER SHEET
NEW ATTACHED
ADU PROJECT
805 CLEMENSEN AVE
SANTA ANA
VICINITY / TRANSIT MAP
PROJECT OVERVIEW
BUILDING INFO
BUILDING CODES
2022 California Residential Code (CRC)
2022 California Electrical Code (CEC)
2022 California Mechanical Code (CMC)
2022 California Plumbing Code (CPC)
2022 California Energy Code (CESC)
2022 California Green Building Standards Code (CalGreen)
Santa Ana Municipal Code (with applicable local amendments)
ADU : 805 Clemensen Ave
Santa Ana, CA 92705 UNIT 2
Lillian Granillo
(909) 241-2095
lescutia18@aol.com
MAIN: 805 Clemensen Ave Santa Ana, CA 92705
396-411-15
7,600 SqFt / 0.174 Acres
SINGLE FAMILY RESIDENCE
Orange County
R1 (Single Family Residential)
Lot Coverage = (1616+388+716) / 7600 = ~36%
NONE
N TR 4226 BLK LOT 28
R-3/U
RESIDENTIAL
V-B
NONE
1
SINGLE
14'-6"
(E) SFR ; ~1,616 SF
(E) GARAGE ; ~ 388 SF
(N) ADU; 716 SFSCOPE OF WORK
Construction of a new attached 716 SF ADU with 1-bedroom, 1-
bathroom unit with kitchen, dining, living area, stacked
washer/dryer hookups, tanked water heater, and ductless minisplit
HVAC. Unit to be fully electric with shared water and sewer lines to
primary residence. Includes demolition of existing assumed
unpermitted ~450 SF sunroom.
Utility Note:
Utilities will be underground per SAMC Section 41-626.
PROJECT INFO
PROJECT ADDRESS:
OWNER(S):
APN:
PARCEL AREA:
PROPERTY TYPE:
JURISDICTION:
ZONING:
LOT COVERAGE
DEFERRED SUBMITTALS:
LEGAL DESCRIPTION:
OCCUPANCY GROUP:
USE:
CONSTRUCTION TYPE:
SPRINKLERS:
UNITS:
NUMBER OF STORIES:
BUILDING HEIGHT
FLOOR AREA:
DISCLAIMER
The contract drawings and specifications depict the
finished structure. Unless otherwise noted, they do not
specify construction methods. The contractor is solely
responsible for supervising and directing the work,
including all construction means, methods, techniques,
sequences, and procedures. Any site observations by the
designer or their engineers are solely to assess general
compliance with the design intent and do not include
oversight of safety measures or construction procedures,
which remain the contractor's sole responsibility.
If any discrepancy, omission, or ambiguity is found in the
calculations, drawings, or specifications, the contractor
must immediately notify the designer or engineer for
clarification. Any failure to do so, or any attempt by the
contractor to resolve such issues without consulting the
designer or engineer, shall place full responsibility for any
resulting consequences, including delays or defects, on
the contractor.
Support services provided by the designer or their
engineers, whether during or after construction, are
intended to assist with quality control and achieving
conformance with contract documents. These services
do not include continuous inspection or guarantee the
contractor ’s performance and shall not be interpreted as
supervision of construction
A01 COVER SHEET
A02 SITE & LANDSCAPE PLAN
A03 PROPOSED FLOOR PLAN
A04 EXISTING & DEMO PLAN
A05 CROSS SECTIONS & ROOF PLAN
A06 MEP PLANS
A07 ELEVATIONS
AD ARCH DETAILS
GN CAL GREEN SHEETS (GN1 & GN2)
T24 TITLE 24 SHEETS (T24.1 & T24.2)
S-0 GENERAL NOTES & REQUIREMENTS.
S-1 FRAMING & FOUNDATION PLANS
SD.0 TYPICAL DETAILS.
SD.1 FOUNDATION DETAILS
SD.2 STRUCTURAL DETAILS
PROJECT INDEX
DESIGNER INFO:
MICHAEL BARBER
DESIGN@MICHAELSDRAFTING.COM
909-486-3789
STRUCTURAL ENGINEER INFO:
ROHIT GRANDHI
908-858-6325
ROHITH.GRANDI@GMAIL.COM
Main Address
805 CLEMENSEN AVE
SANTA ANA UNIT 2
ADU ADDRESS
1
1
1
THE ADU SF / SFD SF RATIO IS FOR PARK & REC FEE PURPOSE
ONLY. THE APPLICANT IS RESPONSIBLE FOR THE GIVEN “SFR
SF” OF THE EXISTING PRIMARY RESIDENCE ; BUILDING SAFETY
STAFF ARE NOT RESPONSIBLE FOR THE ACCURACY OF THE
GIVEN “SFR SF” OF THE EXISTING RESIDENCE.
CITY SQUARE FOOTAGE NOTEPARK & REC NOTE
TITLE24 CONSULTANT:
OSCAR BAUTISTA
626-434-0930
CONTACT@T24PRO.COM
3
3
(E) SFR (E) GARAGE (N) ADU
3
No.Description Date
1 BLDG PC1 11/19/2025
2 BLDG PC2 1/30/2026
3 BLDG PC3 2/24/2026
WH
(E) SFR
~1,616 SF
(N) ADU
716 SF
CL
E
M
E
M
S
E
N
A
V
E
.
PL
PLPL
PL
PL
PL
PL PL
PL
PL
(E) PATIO WM
6
93.81
'40.
3
1
'
67
.
1
6
'
95.42
'
55
.
0
3
'
(E) CONCRETE
(E) DRIVEWAY
8
GAS EP
9
7
EP
5
4
1
(E) FENCE ALONG PL(E) FENCE ALONG PL
(E
)
F
E
N
C
E
A
L
O
N
G
P
L
(E
)
F
E
N
C
E
A
L
O
N
G
P
L
(E
)
F
E
N
C
E
A
L
O
N
G
P
L
(E)
F
E
N
C
E
A
L
O
N
G
P
L
(E) FEN
C
E
A
L
O
N
G
P
L
(E) FEN
C
E
A
L
O
N
G
P
L
(E
)
G
A
T
E
(E
)
S
U
N
R
O
O
M
D
E
M
O
(E
)
S
U
N
R
O
O
M
D
E
M
O
(E) SUNROOM DEMO (E) SUNROOM DEMO (E
)
S
U
N
R
O
O
M
D
E
M
O
(E
)
S
U
N
R
O
O
M
D
E
M
O
(E) SUNROOM DEMO(E) SUNROOM DEMO
(E) STO
R
A
G
E
100 SF
30' - 5 1/4"
26
'
-
4
1
/
4
"
44
'
-
4
"
6'
-
1
1
/
4
"
5' - 4 1/4"
52' - 3 1/4"
68' - 0 1/2"
NOTE: NO EXISTING EASEMENTS
ON SITE
Land Scaped
Area
(Verify Existing Plants)
3'
-
0
3
/
4
"
3'
-
2
1
/
2
"
3'
-
1
3
/
4
"
2'
-
1
1
1
/
4
"
2'
-
1
0
1
/
4
"
3'
-
0
3
/
4
"
3'
-
0
3
/
4
"
3'
-
0
3
/
4
"
2' - 7"2' - 4"2' - 7"2' - 4"2' - 10"
805 E
Clemensen
Ave Unit# 2
805 E
Clemensen Ave
1
SE
W
E
R
SE
W
E
R
SE
W
E
R
SEWERSEWERSEWERSEWER
NEW CONNECTION
SE
W
E
R
SEWERSEWERSEWER
NEW CONNECTION
WA
T
E
R
WA
T
E
R
WA
T
E
R
WA
T
E
R
WATERWATERWATERWATER
WA
T
E
R
WATER
VIF VIF VIF
VIFVIF VIF
5%
5%
5%5%5%
5%
5%
5%
5%5%
5%
5%
2%
2%2%
2%
2%
2%
2%
2%
2%2%2%
2%
2%
2%
2%
1
6'
-
7
1
/
4
"
6"
E
A
V
E
S
6" EAVES
6" EAVES
6"
E
A
V
E
S
7' - 9 1/4"
7' - 3 1/4"
44
'
-
1
0
"
EAVES SHALL
BE A MINIMUM OF 5'
FROM PROPERTY LINES
TO AVOID FIRE SEPERATION
DETAILS. REFER TO DETAIL 2/AD
WHERE APPLICABLE & FIRE TABLE
2
2
VIFVIF
(N) CONCRETE
(E) GARAGE
~388 SF
3
LANDSCAPE LEGEND
Canopy Tree (24" Box)
Landscape Area /
Ground Cover
5-Gallon Shrub
1-Gallon Shrub
3/16" = 1'-0"
SITE & LANDSCAPE PLAN1
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
0
3
P
M
A02
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
SITE PLAN
1.(E) SUNROOM TO BE DEMOLISHED FOR (N) ADU. ASSUMED
TO BE UNPERMITTED AS NO PUBLIC BUILDING PERMIT IS
SHOWN ON PUBLIC PORTAL.
2. WATER AND WASTE LINES TO BE SHARED BETWEEN ADU
AND MAIN RESIDENCE.
3. ADU REQUIRES NO GAS LINES (FULLY ELECTRIC).
4. (N) MINI SPLITS TO BE INSTALLED PER TITLE 24
SPECIFICATIONS.
5. (N) 100 AMP SUBPANEL FOR THE ADU TO BE CONNECTED TO
(E) 200 AMP PANEL.
6. (N) ELECTRIC TANKED WATER HEATER TO BE INSTALLED
FOR ADU PER TITLE 24 SPECS.
7. (E) WATER METER
8. (E) GAS METER
9. (E) ELECTRIC METER
SITE PLAN NOTES
LANDSCAPE NOTES
FRONT YARD LANDSCAPING (PER SAMC §41-240):
Provide minimum of one (1) 24" box canopy tree, ten (10) 5-gallon
shrubs, six (6) 1-gallon shrubs, and groundcover for remaining yard
area.
Final plant species and drought-tolerant landscaping to comply with
SAMC §41-240 prior to final inspection.
SHARED WATER AND SANITARY SEWER LINES SERVING THE
PRIMARY RESIDENCE AND ADU ARE SHOWN SCHEMATICALLY.
SANITARY SEWER SIZE SHALL MATCH EXISTING, 3" MINIMUM.
DOMESTIC COLD WATER SUPPLY TO ADU SHALL BE 3/4"
MINIMUM, OR SIZED PER CPC.
FINAL ROUTING, SIZING, AND POINT OF CONNECTION TO BE
VERIFIED IN FIELD BY LICENSED PLUMBING CONTRACTOR AND
APPROVED BY INSPECTOR.
SHARED WATER & SEWER 1
LOT SHALL BE GRADED TO DRAIN SURFACE WATER AWAY
FROM THE FOUNDATION. THE GRADE SHALL FALL NOT
FEWER THAN 6 INCHES WITHIN THE FIRST 10 FEET.
IMPERVIOUS SURFACE MAY BE MIN 2% SLOPE. DRAINS OR
SWALES SHALL BE PROVIDED WHERE 10' DISTANCE CAN'T BE
PROVIDED(CRC R401.3). PLEASE SHOW.
SITE DRAINAGE1
No.Description Date
1 BLDG PC1 11/19/2025
2 BLDG PC2 1/30/2026
3 BLDG PC3 2/24/2026
WH
DW
3 3
5
C
A
7
6
B
3
A05
8
1
A05
16LIVING AREA
BEDROOM
DINING
& KITCHEN
5' - 3"1' - 9"
16
'
-
1
1
"
25' - 0 1/2"
25
'
-
1
1
1
/
4
"
6'
-
6
1
/
4
"
16
'
-
0
"
3'
-
7
"
8'
-
5
1
/
2
"
3'
-
1
1
1
/
2
"
10
'
-
7
1
/
2
"
6'
-
3
1
/
2
"
32
'
-
5
1
/
2
"
17' - 1 1/2"
13
'
-
8
"
5'
-
7
1
/
2
"
6' - 10"
BATH WIC
LNDRY
4'
-
4
"
12
'
-
1
1
/
2
"
1' - 3"
1
AD
1' - 3
"
LOUVERED1
LOUVERED1
1
1
1
MI
N
3'
-
0
"
MIN
3' - 0"
7' - 0"
12
'
-
1
0
1
/
2
"
Wall Legend
New Wall
Existing Wall
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
0
4
P
M
A03
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
PROPOSED
FLOOR PLAN
1/4" = 1'-0"
PROPOSED PLAN1
Door Schedule
Tag Width Height Count
3 3' - 0"6' - 8"2
5 4' - 6"6' - 8"1
6 3' - 0"6' - 8"1
7 3' - 0"6' - 8"1
8 1' - 11"5' - 0"1
16 11' - 0"7' - 6"1
Window Schedule
Tag Width Height Count
A 4' - 0"4' - 0"1
B 2' - 0"2' - 0"1
C 3' - 0"3' - 0"1
160 CFM RANGE EXHAUST FAN TO BE INSTALLED OVER
ELECTRIC COOKTOP
MINISPLITS TO BE INSTALLED PER TITLE24 CALCULATION
SPECIFICATIONS
STACKED/COMBO LAUNDRY MACHINE
ALL STRUCTURES WILL MATCH IN COLOR, MATERIAL, AND
AESTHETIC.
ALL ROOFLINES MATCH IN SIMILAR PITCH, COLOR, AND
MATERIAL FOR ALL UNITS.
DUCTS FOR DRYER VENTS SHALL BE A MINIMUM OF 4 ” IN
DIAMETER. THE EXHAUST DUCT SHALL NOT EXCEED A TOTAL
COMBINED HORIZONTAL AND VERTICAL LENGTH OF 14 FEET,
INCLUDING TWO 90 DEGREE ELBOWS. (CMC 504.4.2).
RECYCLE AND/OR SALVAGE FOR REUSE A MINIMUM OF 65
PERCENT OF THE NONHAZARDOUS CONSTRUCTION AND
DEMOLITION WASTE IN ACCORDANCE WITH THE CALIFORNIA
GREEN BUILDING STANDARDS CODE, CHAPTER 4, DIVISION
4.4." CRC R334.1
ENCLOSED ELECTRIC TANKED WATER HEATER OUTSIDE OF
RESIDENCE.
*VIEW DEMO PLAN FOR DEMO WALLS
MAXIMUM THRESHOLD AND A LANDING OF NOT LESS THAN 36 ”
MEASURED IN THE
DIRECTION OF TRAVEL FOR DOORS #6 AND #16 (CRC R311.3).
R311.3.1 FLOOR ELEVATIONS AT THE REQUIRED EGRESS
DOORS
LANDINGS OR FINISHED FLOORS AT THE REQUIRED EGRESS
DOOR SHALL BE NOT MORE THAN 11/2 INCHES (38 MM) LOWER
THAN THE TOP OF THE THRESHOLD.
EXCEPTION: THE LANDING OR FLOOR ON THE EXTERIOR
SIDE SHALL BE NOT MORE THAN 7 3/4 INCHES (196 MM)
BELOW THE TOP OF THE THRESHOLD PROVIDED THAT
THE DOOR DOES NOT SWING OVER THE LANDING OR
FLOOR.
FLOOR PLAN NOTES
COMMON AREA: 372 SF
PRIVATE AREA: 344 SF
TOTAL AREA: 716 SF
COMMON AREA: 51.7%
PRIVATE AREA: 48.3%
COMPLIES WITH 50/50 SPACE REQUIREMENT.
COMMON VS. PRIVATE
SPACE CALCULATION
1
Interior View 12
Interior View 23
2
No.Description Date
1 BLDG PC1 11/19/2025
2 BLDG PC2 1/30/2026
(E) SUN ROOM
TO BE DEMOLISHED
20
'
-
4
"
18' - 1"
(E) FRONT
PORCH
Demo Plan Legend
New Wall
Existing Wall
Demo
1/4" = 1'-0"
EXISTING & DEMO PLAN1
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
0
4
P
M
A04
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
EXISTING &
DEMO PLANS
DEMO PLAN NOTES
THE PROJECT CONSISTS OF THE COMPLETE DEMOLITION OF
THE EXISTING SUNROOM STRUCTURE AND CONSTRUCTION OF
A NEW DETACHED ACCESSORY DWELLING UNIT (ADU) IN ITS
PLACE. WORK SHALL COMPLY WITH ALL APPLICABLE CODES
AND STANDARDS ENFORCED BY THE ORANGE COUNTY
BUILDING DEPARTMENT.
EXISTING SUNROOM , INCLUDING SLAB/FOUNDATION, WALLS,
ROOF STRUCTURE, WINDOWS, AND FINISHES, TO BE FULLY
DEMOLISHED AND REMOVED FROM SITE.
DEMOLITION WORK TO BE PERFORMED IN ACCORDANCE WITH
2022 CALIFORNIA BUILDING CODE (CBC), CALIFORNIA
RESIDENTIAL CODE (CRC), AND ORANGE COUNTY DEMOLITION
GUIDELINES.
DISCONNECT, CAP, AND SECURE ALL UTILITIES (ELECTRICAL,
PLUMBING, GAS, HVAC) PER APPLICABLE CODES AND UTILITY
PROVIDER REQUIREMENTS.
CONTRACTOR IS RESPONSIBLE FOR SAFE DISPOSAL OF ALL
DEBRIS AND PROVIDING PROOF OF COMPLIANCE WITH
ORANGE COUNTY CONSTRUCTION & DEMOLITION (C&D)
WASTE MANAGEMENT PROGRAM (MINIMUM 65% DIVERSION
RATE).
No.Description Date
4"
/
1
2
"
4" / 12"4" / 12"
4" / 12"
4"
/
1
2
"
4"
/
1
2
"
4" / 12"
4"
/
1
2
"
4"
/
1
2
"
4" / 12"
4" / 12"
4"
/
1
2
"
4" / 12"
(E) ROOF
(N) ROOF
2
AD
Typ
SO
F
F
I
T
V
E
N
T
I
N
G
17
'
-
7
"
14
'
-
4
"
31
'
-
8
"
SO
F
F
I
T
V
E
N
T
I
N
G
SO
F
F
I
T
V
E
N
T
I
N
G
SO
F
F
I
T
V
E
N
T
I
N
G
2
PROVIDE APPROX. 40 –45 LINEAR FEET
TO ACHIEVE MIN. ≈ 399 IN² NFVA
2
Finished Floor
0' - 0"
Ceiling Height
8' - 0"
Roof Peak
14' - 6"
R-15
PER T24
R-30
PER T24
Finished Grade
-0' - 8"
9
AD
2
Finished Floor
0' - 0"
Ceiling Height
8' - 0"
Roof Peak
14' - 6"
1
AD
1
1
R-15
PER T24
R-30
PER T24
Typ
2
AD
Finished Grade
-0' - 8"
8
AD
3/16" = 1'-0"
Roof Plan2
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
0
5
P
M
A05
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
Cross Sections
& Roof
3/8" = 1'-0"
Section 13
3/8" = 1'-0"
Section 21
FLOOR PLAN NOTES
~ADU ROOF SHALL MATCH EXISTING SFR~
ROOF MANUFACTURER DETAILS: GAF TIMBERLINE SERIES,
CLASS A ASPHALT SHINGLE, ICC-ES EVALUATION REPORT
ESR-1475.
MATERIAL: ASPHALT SHINGLES WILL BE USED AS THE
PRIMARY ROOFING MATERIAL.
UNDERLAYMENT: ROOFING FELT UNDERLAYMENT WILL BE
INSTALLED BENEATH THE ASPHALT SHINGLES FOR ADDED
WATERPROOFING.
INSTALLATION: SHINGLES, UNDERLAYMENT, AND FLASHINGS
MUST BE INSTALLED IN ACCORDANCE WITH IBC SECTION
1507.2 OR IRC SECTION R905.2, EXCEPT AS NOTED IN THE
RELEVANT REPORT. INSTALLATION WILL FOLLOW
MANUFACTURER INSTRUCTIONS AND LOCAL BUILDING CODES.
FLASHING & FASTENERS: FLASHING WILL BE APPLIED AT
PENETRATIONS, VALLEYS, AND SIDEWALLS. GALVANIZED
ROOFING NAILS WILL SECURE THE SHINGLES TO THE ROOF
DECK.
COMPLIANCE: INSTALLATION MUST COMPLY WITH §R905 CRC
AND ALL APPLICABLE LOCAL CODES.
ATTIC VENT NOTES
LOAD CALCS
LOAD CALCULATION SUMMARY (NEC 220)
MAIN RESIDENCE (2,016 SF, MIXED FUEL):
• GEN. LIGHTING & RECEPTACLES: 6,048 VA
• APPLIANCES, HVAC, MISC.: 22,000 VA
• SUBTOTAL: 28,048 VA → ~117A @ 240V
ADU (705 SF, ALL-ELECTRIC):
• GEN. LIGHTING & RECEPTACLES: 2,115 VA
• RANGE, DRYER, HVAC, WH, MISC.: 20,625 VA
• SUBTOTAL: 22,740 VA → ~95A @ 240V
COMBINED LOAD ESTIMATE:
• TOTAL CONNECTED LOAD: ~50,788 VA
• DEMAND-ADJUSTED LOAD: ~41,000 VA
• ESTIMATED AMPERAGE: ~171A @ 240V
PROPOSED SERVICE:
• EXISTING 200A MAIN PANEL TO REMAIN.
• NEW 100A SUBPANEL TO SERVE THE FULLY ELECTRIC ADU,
FED FROM MAIN PANEL.
• LOAD CALCULATIONS CONFIRM EXISTING SERVICE CAPACITY
IS SUFFICIENT.
ATTIC / ROOF AREA ≈ 716 SF
REQUIRED NET FREE VENT AREA (NFVA):
716 SF ÷ 150 = 4.77 SF NFVA REQUIRED
4.77 SF × 144 = 687 IN² NFVA REQUIRED (MIN.)
HIGH VENTING:
– (4) ROOF VENTS (O ’HAGIN OR EQUAL / GREATER),
INSTALLED WITHIN 3'-0" OF RIDGE
– ≈ 72 IN² NFVA EACH
– TOTAL HIGH VENTING PROVIDED ≈ 288 IN² NFVA
LOW VENTING:
– CONTINUOUS / LINEAR SOFFIT VENTS (OR EQUIVALENT)
PROVIDED ALONG EAVE LINE
– PROVIDE APPROX. 40 –45 LINEAR FEET TO ACHIEVE MIN. ≈
399 IN² NFVA
TOTAL PROVIDED NFVA ≈ 687 IN² (MEETS 1/150
REQUIREMENT).
VENTILATION IS DISTRIBUTED BETWEEN HIGH AND LOW
LOCATIONS TO
PROVIDE CONTINUOUS AIRFLOW IN ACCORDANCE WITH CRC
R806.2.
FINAL VENT TYPES, SIZES, AND NFVA RATINGS SHALL MATCH
MANUFACTURER SPECIFICATIONS.
FINAL VENT LOCATIONS AND EXACT COUNTS MAY BE
ADJUSTED IN THE FIELD,
PROVIDED THE MINIMUM REQUIRED 687 IN² TOTAL NFVA AND
HIGH/LOW DISTRIBUTION ARE MAINTAINED.
1
2
No.Description Date
1 BLDG PC1 11/19/2025
2 BLDG PC2 1/30/2026
SM
S/C
WH
EL
E
C
T
M
E
T
E
R
ELECTRICAL LEGEND
LIGHT
SYMBOLS
EXHAUST FAN
GFCI OUTLET
AFCI DUPLEX
SWITCH
SMOKE / CARBON
DETECTORC/S
3
A05
1
A05
LOUVERED1
VS
1
1
2
4
6
7
8
9
9
5
LOUVERED
1
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
0
5
P
M
A06
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
MEP Plan
1/4" = 1'-0"
MEP PLANS1
MEP NOTES
1.160 CFM RANGE EXHAUST FAN TO BE INSTALLED OVER
ELECTRIC COOKTOP
2. 240V OUTLET FOR WH, DRYER AND COOKTOP.
3. 120V GFCI OUTLET PER CEC 210.52E, 210.8A, AND 406.9B
4. ALL BATHROOMS WITH A BATHTUB OR SHOWER SHALL BE
MECHANICALLY VENTILATED WITH MINIMUM 50 CFM
INTERMITTENT OR 20 CFM CONTINUOUS FANS. ALL FANS
SHALL BE HUMIDITY-CONTROLLED PER CALGREEN 4.506.1.
5. DISCONNECTS TO BE PROVIDED TO CONDENSOR UNITS PER
CEC 440.14
6. BATHTUB AND SHOWER FLOORS AND WALLS ABOVE
BATHTUBS WITH INSTALLED SHOWER HEADS
AND IN SHOWER COMPARTMENTS SHALL BE FINISHED WITH A
NONABSORBENT SURFACE. SUCH WALL SURFACES
SHALL EXTEND TO A HEIGHT OF NOT LESS THAN 6 FEET
ABOVE THE FLOOR (CRC R307.2).
7. OPENING OF NOT LESS THAN 100 SQ. IN. FOR MAKEUP AIR
SHALL BE PROVIDED IN THE DOOR OR BY OTHER
APPROVED MEANS TO THE LAUNDRY ROOM (CMC 504.4.1 &
701.3).
8. IN BATHROOMS, LAUNDRY ROOMS, AND WALK-IN CLOSETS,
AT LEAST ONE INSTALLED LUMINAIRE SHALL BE
CONTROLLED BY AN OCCUPANCY OR VACANCY SENSOR
PROVIDING AUTOMATIC-OFF FUNCTIONALITY. (SECTION
150.0(K)2EI).
9. OUTDOOR LIGHTING (ABOVE LANDINGS AND ENTRY DOORS)
ATTACHED TO A BUILDING AND SEPARATELY
CONTROLLED FROM THE INSIDE OF A DWELLING UNIT SHALL
MEET THE REQUIREMENT IN ITEM I AND THE
REQUIREMENTS IN EITHER ITEM II OR ITEM III (SECTION
150.0(K)3A):
I. CONTROLLED BY A MANUAL ON AND OFF CONTROL
SWITCH THAT PERMITS THE AUTOMATIC ACTIONS OF
ITEM II OR III BELOW ; AND
II. CONTROLLED BY A PHOTOCELL AND EITHER A MOTION
SENSOR OR AN AUTOMATIC TIME SWITCH
CONTROL; OR
III. CONTROLLED BY AN ASTRONOMICAL TIME CLOCK
CONTROL.
CONTROLS THAT OVERRIDE TO ON SHALL NOT BE
ALLOWED UNLESS THE OVERRIDE AUTOMATICALLY
RETURNS THE
AUTOMATIC CONTROL TO ITS NORMAL OPERATION
WITHIN 6 HOURS. AN ENERGY MANAGEMENT CONTROL
SYSTEM THAT PROVIDES THE SPECIFIED LIGHTING
CONTROL FUNCTIONALITY AND COMPLIES WITH ALL
REQUIREMENTS APPLICABLE TO THE SPECIFIED
CONTROLS MAY BE USED TO MEET THESE
REQUIREMENTS.
1
1
No.Description Date
1 BLDG PC1 11/19/2025
Finished Floor
0' - 0"
Ceiling Height
8' - 0"
Roof Peak
14' - 6"
ADU
Finished Grade
-0' - 8"0'
-
7
1
/
2
"
LANDING
HEIGHT
Finished Floor
0' - 0"
Ceiling Height
8' - 0"
Roof Peak
14' - 6"
ADU Finished Grade
-0' - 8"0'
-
7
1
/
2
"
Finished Floor
0' - 0"
Ceiling Height
8' - 0"
Roof Peak
14' - 6"
ADU
WH ENCLOSURE
Finished Grade
-0' - 8"0'
-
7
1
/
2
"
LANDING
HEIGHT2
ADU
WH ENCLOSURE
Finished Grade
-0' - 8"0'
-
7
1
/
2
"
LANDING
HEIGHT
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
0
6
P
M
A07
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
ELEVATIONS
1/4" = 1'-0"
West Elevation3
1/4" = 1'-0"
South Elevation1
1/4" = 1'-0"
East Elevation2
1/4" = 1'-0"
North Elevation4
ELEVATION NOTES
NEW ADU EXTERIOR ELEVATIONS SHALL MATCH THE
ARCHITECTURAL STYLE, PROPORTIONS, MATERIALS, AND
FINISHES OF THE EXISTING PRIMARY RESIDENCE TO MAINTAIN
COHESIVE AESTHETICS AND NEIGHBORHOOD CHARACTER.
EXTERIOR WALL FINISH TO MATCH EXISTING RESIDENCE IN
TEXTURE, MATERIAL, AND COLOR (E.G., SMOOTH STUCCO,
SKIP TROWEL, BOARD AND BATTEN, OR HORIZONTAL LAP
SIDING).
FINISH COAT TO MATCH EXISTING COLOR USING
MANUFACTURER’S SPECIFICATION OR FIELD COLOR MATCH.
MATCH EXISTING WINDOW AND DOOR TRIM IN SIZE, PROFILE,
AND MATERIAL.
PROVIDE MATCHING FASCIA BOARDS, CORNER TRIM, AND
OTHER DECORATIVE ARCHITECTURAL ELEMENTS CONSISTENT
WITH THE EXISTING RESIDENCE.
ROOF OVERHANGS, EAVES, RAKE DETAIL, AND RIDGE LINE
HEIGHTS TO REFLECT PROPORTIONS OF THE EXISTING
RESIDENCE.
PROVIDE CONSISTENT EAVE DEPTH AND SOFFIT TREATMENT
(E.G., VENTED OR CLOSED SOFFITS).
FASCIA SIZE AND PROFILE TO MATCH EXISTING (E.G., 2X6 WITH
DRIP EDGE FLASHING).
WINDOW AND DOOR STYLES TO MATCH EXISTING IN
OPERATION TYPE, GRID PATTERN (IF ANY), AND FRAME
MATERIAL/COLOR.
MAINTAIN CONSISTENT HEAD HEIGHTS AND ALIGNMENT WITH
HORIZONTAL BANDS OF THE EXISTING STRUCTURE, WHERE
APPLICABLE.
NEW FENESTRATION TO MEET CURRENT TITLE 24 ENERGY
EFFICIENCY
ADU PLATE HEIGHTS AND RIDGE ELEVATIONS SHALL BE
PROPORTIONAL TO THE MAIN HOUSE AND WITHIN THE
ALLOWABLE HEIGHT LIMITS SET BY ORANGE COUNTY ZONING
CODE.
EXTERIOR LIGHT FIXTURES TO COMPLEMENT THOSE ON THE
EXISTING RESIDENCE.
No.Description Date
2 BLDG PC2 1/30/2026
1 HOUR RATED AND STC 50
TO 54 PER GA FILE No. WP
3242
1 LAYER 5/8" TYPE 'X' GYP. BD.
EACH SIDE
3" MIN. BATT INSULATION
MIN. 2X4 STUDS AT 24" O.C.,
SEE STRUCTURAL DRAWINGS
RESILIENT CHANNELS
PERPENDICULAR TO JOISTS
AT 16" O.C.
PROVIDE FIRE BLOCKING AT 10'-0"
HORIZONTALLY AND VERTICALLY
FIRE-RESISTANCE-RATED FLOOR/CEILING AND WALL
ASSEMBLIES SHALL EXTEND TO AND BE TIGHT AGAINST
THE EXTERIOR WALL, AND WALL ASSEMBLIES SHALL
EXTEND FROM THE FOUNDATION TO THE UNDERSIDE OF
THE ROOF SHEATHING.
NOTE: WHERE PENETRATIONS OCCUR,
PROVIDE UL-LISTED FIRESTOP AND
ACOUSTICAL SEALANT SYSTEMS TO
MAINTAIN REQUIRED FIRE-RESISTANCE
AND STC RATING.
NOTE: CONTRACTOR MAY PROVIDE ANY EQUIVALENT 1-
HOUR FIRE-RATED INTERIOR PARTITION ASSEMBLY
MEETING STC 50 –54. DETAIL SHOWN IS A BASELINE
REFERENCE (GA WP 3242).
CONTRACTOR MAY SUBMIT MANUFACTURER CUT SHEETS
OF THEIR SELECTED SYSTEM TO THE
BUILDING INSPECTOR FOR FINAL APPROVAL.
PENETRATIONS SHALL BE PROTECTED BY AN
APPROVED PENETRATION FIRESTOP SYSTEM INSTALLED
AS TESTED IN ACCORDANCE WITH ASTM E814 OR UL
1479, WITH A POSITIVE PRESSURE DIFFERENTIAL OF
NOT LESS THAN 0.01 INCH OF WATER (3 PA) AND SHALL
HAVE AN F RATING OF NOT LESS THAN THE REQUIRED
FIRE-RESISTANCE RATING OF THE WALL OR FLOOR-
CEILING ASSEMBLY PENETRATED (CRC R302.4.1.2).
2
SEE PLAN
ROOFING (SEE PLAN)
2X BLK'G
1x4 OVER 2x6
FASCIA
1X4 ''V'' GROOVE T+G SOFFIT
OVER 5/8'' TYPE 'X' GYP. BD WHEN
LESS THAN 5'-0" TO PROPERTY LINE
FOR 1 HOUR FIRE RATING
STUCCO EXT. FINISH
1/2" GYP. WHERE SLOPE
CEILING OCCURS.
GA
P1"
IF EAVE IS < 5' TO PL: 1-HR FIRE
RATED ROOF EAVE IS
PROVIDED. NO OPENINGS ARE
ALLOWED ON THE UNDERSIDE
OF THE EAVES.
THE FIRE-RESISTANCE RATING
SHALL BE REDUCED TO 0
HRS ON THE UNDERSIDE OF
THE EAVE OVERHANG IF
FIREBLOCKING IS PROVIDED
FROM THE WALL TOP
PLATE TO THE UNDERSIDE OF
THE ROOF SHEATHING
2
FLOOR LEVEL
OPENABLE
AREA
EMERGENCY ESCAPE/ RESCUE OPENING (R310)
SINGLE CASEMENT: 2-4
X 4-0, 2-6 X 3-6
DOUBLE CASEMENT: 4-8 X
4-0
CASEMENT/ FIXED
COMBO: 7-0 X 4-0
OTHER WINDOW TYPES
REQUIRE MNFR. DATA
SINGLE/ DOUBLE
HUNG: 3-0 X 5-0, 3-0
X 5-6 ,3-4 X 5-0, 3-8
X 5-0, 4-0 X 5-0
SLIDER: 4-0 X 4-0, 5-0
X 3-6, 6-0 X 3-0
SLIDER/ FIXED COMBO:
8-0 X 4-0, 10-0 X 4-0, 12-0
X 3-0
5.7 S.F.
•
•
•
20" MIN. CLEAR WIDTH
24" MIN. CLEAR HEIGHT
5.0 SF MIN. OPENABLE AREA AT GRADE
FLOOR ONLY, 5.7 SF MIN. ELSEWHERE.
APPROXIMATE WINDOW SIZES ALLOWING FOR 5.0 SF. TO MEET
MINIMUM EGRESS REQUIREMENTS
OPENABLE
AREA
5.
7
S
.
F
.
41
"
C
L
E
A
R
CLR.
20" MIN.
CLEAR
34"
CL
R
.
24
"
M
I
N
.
VERIFY ACTUAL WINDOW DIMENSIONS WITH MANUFACTURER.
MA
X
.
4
4
"
5.0 S.F.
5.
0
S
.
F
.
5"
4"
?
SLOPE GRADE
2% MIN. FOR 60"
SHEARWALL
PER PLAN
3/
8
"
STUD WALL
PER PLAN
7/8" (3) COAT CEMENT
STUCCO INSTALL PER
CRC SECTION R703
MI
N
.
8"
CORROSION RESISTANT
WEEP SCREED 26 GAUGE
MIN.
MI
N
.
4"
SHEARWALL
PER PLAN
3/
8
"
STUD WALL
PER PLAN
7/8" (3) COAT CEMENT
STUCCO INSTALL PER
CRC SECTION R703
2"
M
I
N
.
SLOPE 2%
MIN. FOR 60"
WEEP SCREED 26 GA
MIN. "J" or "L" PROFILE
EXTERIOR
FLATWORK
PER PLAN
BACKER ROD &
SEALANT
2"
M
I
N
.
NTS
1 HOUR STC 50 TO 54 INTERIOR PARTITION1 NTS
EAVE TYP.2
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
0
7
P
M
AD
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
ARCHITECTURAL
DETAILS
NTS
AIP - Doorbell3
NTS
AIP - Electrical4 NTS
AIP - Grab Bars5 NTS
AIP - Interior Doors6
NTS
EGRESS REQUIREMENTS7 NTS
WEEP SCREED TYPICAL8
2
NTS
WEEP SCREED @ HARDSCAPE TYPICAL9
2
No.Description Date
2 BLDG PC2 1/30/2026
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
0
9
P
M
GN1
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
Green Notes 1
No.Description Date
1 BLDG PC1 11/19/2025
Scale
THESE PLANS ARE THE
PROPERTY OF MICHAEL'S
DRAFTING LLC. THEY ARE
PROVIDED AS A SERVICE AND
ARE PROTECTED BY
COPYRIGHT. ANY COPYING,
REPRODUCTION, OR
REDISTRIBUTION OF THESE
PLANS WITHOUT EXPLICIT
WRITTEN PERMISSION FROM
THE OWNER IS STRICTLY
PROHIBITED.
AS NOTED
Michael Barber
michaelsdrafting
(909) 486-3789
Drafter / Designer
Rohit Grandhi
Grandhi Consults.
(908) 858-6325
Structural Engineer
Oscar Bautista
T24 PRO
(626) 434-0930
T24 Consultant
3/3/2026
3/
3
/
2
0
2
6
1
:
1
3
:
1
1
P
M
GN2
ADU: 805 E
Clemensen
Ave Unit# 2
ADU PROJECT
Green Notes 2
No.Description Date
1 BLDG PC1 11/19/2025
1
2
1
CONCRETE NOTES
1.ALL STRUCTURAL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28
DAYS SHALL BE MIN 2500 PSI, U.N.O.
2.CONCRETE IS REINFORCED AND CAST-IN-PLACE UNLESS OTHERWISE NOTED. WHERE
REINFORCING IS NOT SPECIFICALLY SHOWN OR WHERE DETAILS ARE NOT GIVEN, PROVIDE
REINFORCING SIMILAR TO THAT SHOWN FOR SIMILAR CONDITIONS, SUBJECT TO REVIEW BY
THE OWNER'S REPRESENTATIVE.
3.ALL PHASES OF WORK PERTAINING TO THE CONCRETE CONSTRUCTION SHALL CONFORM
TO THE LATEST EDITION OF ACI318 "BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE", AND THE LATEST EDITION OF ACI117 "SPECIFICATIONS FOR TOLERANCES FOR
CONCRETE CONSTRUCTION AND MATERIALS".
4.NO MORE THAN ONE GRADE OF CONCRETE SHALL BE ON THE JOB SITE AT ANY ONE TIME.
5.CONCRETE MIXES SHALL BE PREPARED WITH TYPE II/V PORTLAND CEMENT CONFORMING
TO ASTM C150.
6.CONCRETE MIX DESIGNS CONTAINING FLY ASH MAY BE USED WHERE CONCRETE IS NOT
VISUALLY EXPOSED. FLY ASH SHALL CONFORM WITH ASTM C618 AND MAY REPLACE UP TO
20% PORLAND CEMENT BY VOLUME.
7.CONCRETE MIX PROPORTIONING SHALL MEET STATISTICAL STRENGTH REQUIREMENTS OF
ACI 301 AND ACI 214R. MIX DESIGNS SHOWING COMPLIANCE WITH STRENGTH
REQUIREMENTS TO BE SUBMITTED TO E.O.R FOR REVIEW.
8.NORMAL WEIGHT CONCRETE AGGREGATES SHALL CONFORM TO ASTM C33. LIGHT WEIGHT
CONCRETE AGGREGATES SHALL CONFORM TO ASTM C330.
9.CONCRETE STRENGTH TEST REPORTS SHALL BE IN COMPLIANCE WITH ACI 318 AND SHALL
BE SUBMITTED TO E.O.R.
10.WATER USED IN MIXING CONCRETE SHALL CONFORM WITH ASTM C1602.
11.THOROUGHLY CLEAN AND ROUGHEN ALL HARDENED CONCRETE AND MASONRY SURFACES
TO RECEIVE NEW CONCRETE. INTERFACE SHALL BE ROUGHENED TO A FULL AMPLITUDE OF
1/4", U.O.N.
WOOD SPECIFICATIONS & NOTES
1.SAWN FRAMING LUMBER - DOUGLAS FIR-LARCH U.N.O:
a.BEAMS/ POST/ RAFTERS & ALL OTHER STRUCTURAL FRAMING:
·2x, 4x MEMBERS: NO. 2
·6x, 8x MEMBERS: NO. 1
b.STUDS: USE STUD GRADE IF HEIGHT UP TO 9'-0" AND NO. 2 IF TALLER THAN 9'-0".
c.PLATES AND BLOCKING: NO. 2
d.ALL LUMBER IN CONTACT WITH CONCRETE OR MASONRY TO BE PRESSURE PRESERVATIVE
TREATED.
e.ALL FRAMING LUMBER SHALL HAVE 19% MAXIMUM MOISTURE CONTENT AT TIME OF
INSTALLATION AND FABRICATION.
2.ENGINEERED LUMBER:
ALL VERSA-LAM LAMINATED VENEER LUMBER MEMBERS (LVL) SHALL BE FABRICATED AND
ERECTED IN ACCORDANCE WITH ICC ES ESR-1040:
a.BEAM/HEADERS WITH 1 3/4" WIDE:Fb = 2800 psi, Fv = 285 psi, E = 2.0E6 psi
b.BEAM/HEADERS WITH 3 1/2" AND WIDER:Fb = 3100 psi, Fv = 285 psi, E = 2.0E6 psi
c.RIMBOARD:Fb = 1750 psi, Fv = 225 psi, E = 1.3E6 psi
3.DIAPHRAGM (U.N.O. ON PLAN):
a.ROOF SHEATHING: INSTALL 15/32" THICK APA-RATED EXP 1 PANELS WITH A MINIMUM SPAN
RATING OF 32/16. FASTEN USING 8D COMMON NAILS SPACED AT 6" O.C. AT PANEL EDGES AND
BEARING SUPPORTS, AND 12" O.C. AT INTERMEDIATE FRAMING.
b.FLOOR SHEATHING: INSTALL 23/32" APA-RATED STURD-I-FLOOR TONGUE-AND-GROOVE EXP 1
PANELS WITH A MINIMUM SPAN RATING OF 24" O.C. SECURE WITH 10D COMMON NAILS SPACED
AT 6" O.C. AT PANEL EDGES AND BEARING SUPPORTS, AND 12" O.C. AT INTERMEDIATE FRAMING.
c.INSTALLATION AND USAGE REQUIREMENTS SHALL COMPLY WITH NER-108.
d.ALL STRUCTURAL GRADE PANELS SHALL BE IDENTIFIED WITH A CERTIFICATION MARK FROM AN
APPROVED AGENCY: APA, PFS/TECO, OR PITTSBURG.
e.ADHESIVES USED FOR SECURING FLOOR SHEATHING TO FRAMING MEMBERS SHALL MEET APA
SPECIFICATION AFG-01.
f.ROOF DIAPHRAGM NAILING MUST BE VERIFIED PRIOR TO CONCEALMENT. PLYWOOD FACE GRAIN
SHALL BE INSTALLED PERPENDICULAR TO SUPPORTS. FLOORS SHALL UTILIZE
TONGUE-AND-GROOVE PANELS OR BLOCKED EDGES. PANEL SPANS SHALL BE IN ACCORDANCE
WITH TABLE 2304.8(1).
4.STRUCTURAL GLUED LAMINATED MEMBERS:
a.ALL STRUCTURAL GLUED LAMINATED MEMBERS SHALL BE COMBINATION 24F-V4 DF/DF
(24F-V8 DF/DF AT ALL CONTINUOUS OR CANTILEVER APPLICATIONS) FABRICATED AND
ERECTED IN ACCORDANCE WITH ANSI/ASTM STANDARD A190.1 AND ASTM D3737.
b.ADHESIVE SHALL BE EXTERIOR TYPE ADHESIVE MEETING REQUIREMENTS OF US
COMMERCIAL STANDARD PS-56 AND ASTM D3737.
c.THE FABRICATOR SHALL FURNISH AITC CERTIFICATES TO THE STRUCTURAL ENGINEER
AND THE BUILDING INSPECTION DEPARTMENT PRIOR TO FRAMING INSPECTION.
5.ALL LEDGERS SHOULD BE SPLICED WITH ST22 STRAP, U.N.O.
6.THE FRAMING CONTRACTOR SHALL NOTIFY THE E.O.R. IN WRITING PRIOR TO
CONSTRUCTION IF THE ROOFING DEAD LOAD EXCEEDS 10 PSF.
7.STUD WALLS PERPENDICULAR TO CONCRETE OR MASONRY WALLS SHALL BE SECURED
USING 5/8" DIAMETER x 8" LONG A307 ANCHOR BOLTS AT THE TOP, MID-HEIGHT, AND
BOTTOM.
8.INSTALL WINDOWS AND DOORS IN STUD WALLS ONLY AFTER DEAD LOADS HAVE BEEN
APPLIED. PROVIDE A 1/2" SHIM GAP AT THE HEAD FOR SETTLEMENT TOLERANCE.
9.ALL POSTS SHALL BE CONTINUOUS FROM FOUNDATION TO ROOF. WHERE DISCONTINUITY
OCCURS AT JOIST SPACES OR ABOVE BEAMS/HEADERS TO LOWER TOP PLATES, PROVIDE
SOLID BLOCKING WITH STUD POSTS.
10.ALL VERTICAL PIPES PASSING THROUGH PLATES AND/OR SOLID RIM BEAMS SHALL BE
DRILLED WITH CLEAN-CUT HOLES MAINTAINING A 1/16" TOLERANCE. NOTCHING OR
CUTTING OF PLATES IS STRICTLY PROHIBITED.
11.BLOCKING AND BRIDGING – PROVIDE AS FOLLOWS:
a.INSTALL 2X SOLID BLOCKING BETWEEN JOISTS AND RAFTERS AT ALL BEARING LOCATIONS.
b.INSTALL 2X SOLID BLOCKING BETWEEN JOISTS AND RAFTERS AT SPACING NOT TO EXCEED
8'-0" ON CENTER, AND NOT MORE THAN 8'-0" FROM ANY SUPPORT.
c.BLOCKING MAY BE OMITTED BETWEEN CEILING JOISTS AND RAFTERS THAT ARE 2X8 OR
SMALLER.
2022 CBC TABLE 2304.10.2 FASTNING SCHEDULE
1. JOIST TO SILL OR GIRDER
2. BRIDGING TO JOIST
3. 1" x 6" SUBFLOOR OR LESS TO EACH JOIST
4. WIDER THAN 1" x 6" SUBFLOOR
TO EACH JOIST
5. 2" SUBFLOOR TO JOIST OR GIRDER
6. SOLE PLATE TO JOIST OR BLOCKING
SOLE PLATE TO JOIST OR BLOCKING
AT BRACED WALL PANEL
7. TOP PLATE TO STUD
8. STUD TO SOLE PLATE 2x4 STUD
2x6 STUD
2x8 STUD
9. DOUBLE STUDS
6-8D
4-16D
8-8D
6-16D
11. BLOCKING BETWEEN JOIST OR RAFTERS
TO TOP PLATE
12. RIM JOIST TO TOP PLATE
13. TOP PLATES, LAPS AND INTERSECTIONS
14. CONTINUOUS HEADER, TWO PIECES
15. CEILING JOISTS TO PLATE
16. CONTINUOUS HEADER TO STUD
17. CEILING JOISTS, LAPS OVER PARTITIONS
18. CEILING JOISTS TO PARALLEL RAFTERS
19. RAFTER TO PLATE
20. 1" DIAGONAL BRACE TO EACH STUD
AND PLATE
21. 1" x 8" SHEATHING TO EACH BEARING
22. WIDER THAN 1" x 8" SHEATHING TO
EACH BEARING
24. BUILT-UP GIRDER AND BEAMS 20D AT 32" O.C.
2-20D
2. JOIST CAN BE EITHER SAWN LUMBER OR I-JOIST PER PLAN
NOTES: 1. COMMON NAILS SHALL BE USED (U.N.O.)
3-8D
2-8D
2-8D
3-8D
2-16D
16D (BOX) AT 16" O.C.
(3) 16D (BOX) AT 16"
2-16D
4-8D
2-16D
16D (BOX) AT 24" O.C.
10. DOUBLED TOP PLATES 16D (BOX) AT 16" O.C.
DOUBLE TOP PLATES 8-16D
3-8D
8D AT 6" O.C.
2-16D
16D
3-8D
4-8D
3-16D
3-16D
3-8D
2-8D
3-8D
3-8D
23. BUILT-UP CORNER STUDS 16D
25. 2" PLANKS 16D
CONNECTION NAILING
26. COLLAR TIE TO RAFTER
27. JACK RAFTER TO HIP
28. ROOF RAFTER TO 2-BY RIDGE BEAM
29. JOIST TO BAND JOIST
30. LEDGER STRIP
3-10D
3-10D
2-16D
2-16D
2-16D
3-16D
3-16D
LOCATION
TOENAIL
TOENAIL EA. END
FACE NAIL
FACE NAIL
BLIND AND FACE NAIL
TYPICAL FACE NAIL
BRACED WALL PANELS
BLIND AND FACE NAIL
TOENAIL
END NAIL
TOENAIL
END NAIL
TOENAIL
END NAIL
FACE NAIL
TYPICAL FACE NAIL
TOENAIL
TOENAIL
24" O.C.
16" O.C.
AT EACH BEARING
FACE NAIL
FACE NAIL
16" O.C. ALONG EDGE
TOENAIL
TOENAIL
FACE NAIL
FACE NAIL
LAP SPLICE
TOENAIL
FACE NAIL
FACE NAIL
FACE NAIL
FACE NAIL AT TOP &
BOTTOM STAGGERED
ON OPPOSITE SIDES
FACE NAIL AT ENDS &
ATEACH SPLICE
TOENAIL
FACE NAIL
TOENAIL
FACE NAIL
FACE NAIL
FACE NAIL
NAILING & HARDWARE NOTES
1.CONNECTORS FOR WOOD CONSTRUCTION NOTED ON PLANS AND DETAILS SHALL BE
SIMPSON COMPANY STRONG-TIE CONNECTORS OR APPROVED EQUAL.
2.ALL JOIST HANGERS SHALL BE SIMPSON U HANGER, ALL BEAM HANGERS SHALL BE
SIMPSON HU HANGERS U.N.O. ON PLAN OR DETAIL. FOLLOW MANUFACTURER'S
RECOMMENDATIONS FOR INSTALLATION.
3.ALL MACHINE BOLTS SHALL CONFORM TO ASTM A307.
4.TYPICALLY SILLS ON CONCRETE FOOTING SHALL BE ANCHORED WITH 5/8" DIAMETER X 12"
MIN. LENGTH MACHINE BOLTS WITH 7" EMBEDMENT AT 72" O.C.. LOCATE BOLTS 6" MIN.
AND 12" MAX. FROM EACH END OF EACH STICK. THERE SHALL BE AT LEAST 2 BOLTS IN EACH
STICK.
5.AT SHEAR WALLS, ANCHOR BOLT SPACING NOT OVER 48" O.C. SEE SHEAR WALL SCHEDULE
FOR SPECIFIC SPACING OF ANCHOR BOLTS WHICH MAY BE NOTED AS LESS THAN 48" O.C..
ANCHOR BOLTS SHALL BE INSTALLED WITH PLATE WASHERS OF MIN. 3" SQ. x 0.229" THICK
BETWEEN SILL PLATE AND NUT. EDGE(S) OF PLATE WASHERS SHALL BE 1/2" MAX. FROM
INSIDE FACE OF SHEAR PANEL(S) PER DETAIL 1/SD.0.
6.AT NON SHEAR WALL, ROUND WASHERS SHALL BE USED ON ALL BOLTS AND SHOULD
CONFORM WITH ANSI/ASME B 18.22.1. USE MIN. 1 3/8" Ø x 7/64" THICK WASHER FOR 1/2" Ø
BOLT, 1 3/4" Ø x 9/64" THICK WASHER FOR 5/8" Ø BOLT AND 2 1/2" Ø x 11/64" THICK
WASHER FOR 1" Ø BOLT. U.N.O.
7.AT INTERIOR NON-SHEAR WALLS, USE SIMPSON PHNW SERIES 0.145 Ø PINS WITH A
PENETRATION OF 1 1/4" INTO SLAB AT 16" O.C. TO BE INSTALLED IN ACCORDANCE WITH ICC
ESR-2138.
8.WHERE NOTCHES FOR PIPES, ETC. , EXCEED 1/3 THE WIDTH OF THE SILL, PLACE A BOLT
WITHIN 6" OF EACH SIDE OF NOTCH. TIEDOWN BOLTS SHALL NOT BE CONSIDERED AS SILL
BOLTS.
9.BOLT HOLES IN WOOD AND STEEL SHALL BE THE DIAMETER OF THE BOLT PLUS 1/16"
10.FASTENERS PENETRATING PRESSURE-PRESERVATIVE TREATED AND FIRE-RETARDANT
TREATED WOOD SHALL BE HOT DEPPED GALVANIZED PER ASTM A153, CLASS D.
11.ALL NAILS SHALL BE SINKER NAILS AND STAGGERED U.N.O., EXCEPT AS SHOWN IN NAILING
SCHEDULE.
12.ALL DIAPHRAGM AND SHEAR WALL NAILING SHALL UTILIZE COMMON NAILS OR
GALVANIZED BOX.
13.LAG SCREWS PER ANSI/ASME STANDARD B18.2.1 PROVIDE LEAD HOLE SAME DIAMETER
AND DEPTH AS SHANK AND THEN DRILL HOLE 60%-70% OF SHANK DIAMETER FOR
THREADED PORTIONS.
FOUNDATION NOTES
1.REFER TO NOTE #1 UNDER REINFORCED CONCRETE FOR CONCRETE STRENGTH
SPECIFICATIONS.
2.THE REQUIREMENTS OUTLINED IN CHAPTER 18 OF THE CBC MUST BE ADHERED TO AS THE
MINIMUM STANDARD UNLESS MORE STRINGENT REQUIREMENTS ARE SPECIFIED IN THE
DRAWINGS OR TECHNICAL SPECIFICATIONS.
3.ALL CONCRETE SHALL MEET THE REQUIRED STRENGTH AND SLUMP PER STRUCTURAL
DESIGN. WHEN EXPOSED TO SULFATE-CONTAINING SOLUTIONS, IT SHALL CONFORM TO
ASTM C-150 TYPE V PORTLAND CEMENT AND COMPLY WITH CBC SECTION 1904 (ACI 318
SECTION 19.3.2.1). AGGREGATES MUST MEET ASTM C-33 STANDARDS, AND MIXING WATER
MUST BE CLEAN AND POTABLE.
4.CONCRETE PLACEMENT MUST BE PERFORMED AS A CONTINUOUS OPERATION UNLESS
OTHERWISE SPECIFIED. THE SLAB SURFACE SHALL BE CURED USING 'HUNTS' COMPOUND
OR AN EQUIVALENT PRODUCT, OR BY OTHER METHODS IN ACCORDANCE WITH INDUSTRY
BEST PRACTICES.
5.CALCIUM CHLORIDE-CONTAINING ADMIXTURES SHALL NOT BE USED IN THE CONCRETE
MIX.
6.BEFORE PLACING CONCRETE, THE CONTRACTOR SHALL MOISTEN THE SAND/MEMBRANE
UNDERLAYMENT TO ENSURE UNIFORM CURING. CONCRETE SLABS SHALL NOT BE POURED
DURING OR IMMEDIATELY AFTER RAINFALL. THE SAND LAYER BENEATH VISQUEEN MUST
NOT BE SATURATED AT THE TIME OF THE POUR, AND ANY STANDING WATER MUST BE
REMOVED PRIOR TO PLACEMENT.
7.EXCAVATED FOOTING BOTTOMS MUST BE LEVEL, CLEAN, AND FREE OF LOOSE MATERIALS
OR WATER BEFORE CONCRETE IS POURED. OVER-EXCAVATED AREAS MUST BE BACKFILLED
WITH CONCRETE OR PROPERLY COMPACTED FILL. BACKFILLING SHOULD NOT OCCUR UNTIL
THE SUPPORTING FOUNDATION, WALLS, AND SLAB HAVE REACHED ADEQUATE STRENGTH
TO RESIST LATERAL SOIL PRESSURE.
8.FOOTINGS MUST REST ON UNDISTURBED NATIVE SOIL.
9.ALL EXCAVATIONS MUST BE PROPERLY BACKFILLED WITH NON-EXPANSIVE SOIL. HOWEVER,
BACKFILL BEHIND RETAINING WALLS MUST ONLY BE PLACED AFTER THE CONCRETE OR
MASONRY HAS REACHED ITS FULL DESIGN STRENGTH.
10.IF NO GEOTECHNICAL REPORT IS PROVIDED, IT IS THE RESPONSIBILITY OF THE LICENSED
GENERAL CONTRACTOR OR OWNER-BUILDER TO VERIFY THAT THE STRUCTURE IS ENTIRELY
SITUATED ON UNDISTURBED, NON-EXPANSIVE NATIVE SOIL. IF FILL, EXPANSIVE SOIL, OR
ANY SIGNS OF GEOLOGICAL INSTABILITY ARE SUSPECTED, THE GEOTECHNICAL ENGINEER
AND THE ENGINEER OF RECORD MUST BE CONSULTED TO MODIFY THE DESIGN
ACCORDINGLY.
11.PRESATURATION REQUIREMENTS FOR SUBGRADE SOILS AND SETBACK DISTANCES FOR
EXTERIOR FOOTINGS FROM DESCENDING SLOPES MUST BE FOLLOWED.
12.THE FINISHED GRADE AROUND THE PERIMETER OF THE SLAB SHALL BE CONSTRUCTED TO
ENSURE THAT RAIN AND IRRIGATION WATER DRAINS AWAY FROM THE STRUCTURE.
13.SITE AND PAD PREPARATION, INCLUDING BUT NOT LIMITED TO GRADING, FILL
COMPACTION, PRESATURATION, AND CONCRETE SLAB BASE PREPARATION, SHALL BE
COMPLETED AS REQUIRED.
14.FOUNDATION DRAWINGS PREPARED BY THE ENGINEER OF RECORD REFLECT STRUCTURAL
REQUIREMENTS. FOR DIMENSIONS, SLOPES, RECESSES, SHELVES, PATIOS, STOOPS, AND
PORCHES NOT INDICATED IN THE FOUNDATION DRAWINGS, REFER TO THE ARCHITECTURAL
PLANS. THE CONTRACTOR AND ARCHITECT MUST VERIFY ALL DIMENSIONS BEFORE
CONSTRUCTION TO ENSURE PROPER FIT.
15.WHERE NEW CONCRETE IS PLACED AGAINST EXISTING CONCRETE, THE EXISTING SURFACE
SHALL BE ROUGHENED TO A MINIMUM AMPLITUDE OF 1/4".
16.GRADE BEAMS SHALL BE POURED MONOLITHICALLY ALONG THEIR ENTIRE LENGTH.
17.ALUMINUM CONDUIT, SLEEVES, AND EMBEDS ARE NOT PERMITTED IN CONCRETE.
18.NO PIPES OR CONDUITS SHALL PASS BENEATH ISOLATED COLUMN FOOTINGS OR
CONTINUOUS WALL FOOTINGS UNLESS SPECIFICALLY DETAILED AND APPROVED BY THE
ARCHITECT, STRUCTURAL ENGINEER, AND BUILDING OFFICIAL.
19.ALL CONDUITS SHALL BE PLACED WITHIN THE MIDDLE ONE-THIRD OF THE SLAB THICKNESS.
THE MAXIMUM CONDUIT DIAMETER SHALL BE 1-1/4", AND CONDUITS MUST BE SPACED AT
LEAST 4 INCHES APART FROM EACH OTHER AND FROM REINFORCING STEEL UNLESS
OTHERWISE APPROVED BY THE STRUCTURAL ENGINEER.
20.A MINIMUM OF ONE #4 REINFORCING BAR SHALL BE PROVIDED FOR ELECTRICAL
GROUNDING, WITH THE LOCATION VERIFIED WITH THE ELECTRICAL CONTRACTOR.
21.ALL HOLDOWNS AND POST ANCHORS MUST BE SECURED IN PLACE PRIOR TO THE
FOUNDATION INSPECTION.
SHEET INDEX
GENERAL NOTES & REQUIREMENTS.
FOUNDATION DETAILS.
S-0
S-1 FRAMING PLANS.
SD.0 TYPICAL DETAILS.
SD.1
STRUCTURAL DETAILS.SD.2
GENERAL NOTES
DESIGN CRITERIA
BUILDING CODE
A. GENERAL
2022 CBC
RISK CATEGORY II
SOIL ENGINIEER SOILS REPORT EXEMPTIONS
REPORT NUMBER PCC-06
DATE 7/1/2024
ALLOWABLE SOIL BEARING PRESSURE 1500 psf
SITE CLASS
D
SHORT PERIOD SPECTRAL ACCELERATION, Ss
1
1ST PERIOD SPECTRAL ACCELERATION, S1
D-DEFAULT
SHORT PERIOD ACCELERATION PARAMETER, SDS
1.334
1 SECOND ACCELERATION PARAMETER, SD1
0.475
SEISMIC RESPONSE COEFFIECIENT, Cs
1.067
0.578
RESPONSE MODIFICATION FACTOR, R 6.5
SEISMIC DESIGN CATEGORY
0.164
SEISMIC IMPORTANCE FACTOR, Ie
DESIGN BASE SHEAR V = 0.7CsW 0.115W
B. SOIL PARAMETERS
D. LATERAL DESIGN PARAMETERS
DESIGN SPEED
EXPOSURE CATEGORY
95 mph
C
C. GRAVITY DESIGN PARAMETERS (psf)
DEAD
ROOF LIVE
LIVE
15
20
ROOF EXTERIOR WALL INTERIOR WALL
17
-
LOAD
10
1.REFERENCE TO CODES, RULES, REGULATIONS, STANDARDS, MANUFACTURER'S
INSTRUCTIONS OR REQUIREMENTS OF REGULATORY AGENCIES IS TO THE LATEST PRINTED
EDITION OF EACH IN EFFECT AT THE DATE OF SUBMISSION OF BID UNLESS THE DOCUMENT
DATE IS SHOWN.
2.STRUCTURAL INFORMATION SHOWN ON FRAMING PLANS IS FOR THE MAIN STRUCTURAL
ELEMENTS. NON-STRUCTURAL ELEMENTS SHALL BE CONSTRUCTED PER APPROVED CODE
REQUIREMENTS.
3.DETAILS OF CONSTRUCTION NOT SHOWN SHALL BE OF SAME NATURE AS THOSE SHOWN
FOR SIMILAR CONDITIONS. REFER TO THE TYPICAL DETAIL SHEETS FOR TYPICAL DETAILS OF
CONSTRUCTION. TYPICAL DETAILS APPLY TO ALL CONSTRUCTION UNLESS SPECIFICALLY
NOTED OR SHOWN OTHERWISE. WHERE CONDITIONS REQUIRE MODIFICATIONS OF A
TYPICAL DETAIL, THE CONTRACTOR SHALL SUBMIT MODIFIED DETAIL FOR APPROVAL BY THE
EOR TO FABRICATION AND INSTALLATION.
4.DO NOT USE SCALED DIMENSIONS, USE WRITTEN DIMENSIONS. WHERE NO DIMENSION IS
PROVIDE, CONSULT THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE
WORK. FIELD MEASURE EXISTING DIMENSIONS NOT NOTED.
5.OMISSIONS OR CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE DRAWINGS, NOTES, AND
DETAILS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND RESOLVED
BEFORE PROCEEDING WITH THE WORK.
6.THE CONTRACTOR SHALL VERIFY THE LOCATION OF EXISTING UTILITIES BEFORE BEGINNING
WORK. SPECIAL CARE SHALL BE TAKEN TO PROJECT UTILITIES THAT ARE TO REMAIN IN
SERVICE DURING CONSTRUCTION.
7.THE CONTRACTOR SHALL INFORM THE ENGINEER IN WRITING OF ANY DEVIATION FROM
THE CONTRACT DOCUMENTS.
8.DRAWINGS AND SPECIFICATIONS REPRESENT FINISHED STRUCTURE. CONTRACTOR SHALL
BE RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION, INCLUDING BUT NOT
LIMITED TO SHORING AND TEMPORARY BRACING. THE CONTRACTOR SHALL TAKE ALL
NECESSARY MEASURES TO INSURE SAFETY OF ALL PERSONS AND STRUCTURES AT THE SITE
AND ADJACENT TO THE SITE. OBSERVATION VISITS TO THE SITE BY THE ARCHITECT,
ENGINEER OR CONSTRUCTION MANAGER SHALL NOT RELIEVE THE CONTRACTOR OF SUCH
RESPONSIBILITY.
9.SPECIFICATIONS RELATED TO WATERPROOFING, INCLUDING BUT NOT LIMITED TO
MEMBRANES, WATERSTOPS, SEALANTS, FLASHING, VAPOR BARRIER, ARE AS SPECIFIED BY
ARCHITECT/WATER PROOFING CONSULTANT.
10.CONSTRUCTION MATERIALS SHALL BE DISTRIBUTED WHEN PLACED ON THE STRUCTURE
SUCH THAT LOADS DO NOT EXCEED DESIGN LIVE LOADS OR RESULT IN AN UNBALANCED
CONDITION.
11.APPROVAL FROM THE AUTHORITY HAVING JURISDICTION MUST BE OBTAINED PRIOR TO
INSTALLATION OF ITEMS REQUIRING DEFERRED SUBMITTAL.
12.STRUCTURAL ELEMENTS INDICATED AS "BY OTHERS" ARE NOT INCLUDED IN THIS SCOPE OF
WORK.
13.THE GENERAL CONTRACTOR SHALL PROVIDE SEPARATE SUBMITTALS FOR SUCH ELEMENTS
TO THE ENGINEER OF RECORD FOR REVIEW. UPON EOR ACCEPTANCE, SUBMITTALS SHALL BE
FORWARDED TO THE BUILDING DEPARTMENT FOR FINAL REVIEW AND APPROVAL.
WIND PARAMETERS
SEISMIC PARAMETERS
MAIN LATERAL RESISTING SYSTEM WOOD SHEARWALL
8
-
CEILING
10
1
1
SPECIAL INSPECTION:
INSPECTION SCHEDULE
SOIL CONDITION (SOIL REPORT)
POST INSTALLED ANCHORS
STRUCTURAL STEEL
STRUCTURAL STEEL WELDING
HIGH STRENGTH BOLTING
MASSONRY WORK
COLD FORMED STEEL
CAST IN PLACE DEEP FOUNDATION
REQ'D
INSPECTION ITEMS CODE REFERENCE
CBC Table 1705.3.8, ICC APPROVAL
CBC 1705.2
CBC 1705.2
CBC 1705.2
CBC 1705.4
CBC 1705.12.2, 1705.13.3
CBC Table 1705.8
CBC Table 1705.6
EPOXY DOWELS ESR 4057
1.SPECIAL INSPECTIONS SHALL BE CONDUCTED IN ACCORDANCE WITH CBC CHAPTER 17.
REFER TO THE INSPECTION SCHEDULE BELOW - ONLY THE MARKED ITEMS ARE REQUIRED.
2.THE OWNER MUST HIRE ONE OR MORE QUALIFIED SPECIAL INSPECTORS TO OVERSEE
CONSTRUCTION INSPECTIONS. THESE INSPECTORS MUST DEMONSTRATE COMPETENCY IN
THEIR SPECIFIC FIELD OF INSPECTION TO THE SATISFACTION OF THE BUILDING OFFICIAL.
3.WHEN WORK IS PERFORMED AT AN APPROVED AND REGISTERED FABRICATION FACILITY,
SPECIAL INSPECTIONS MAY NOT BE NECESSARY. APPROVED FABRICATORS MUST PROVIDE
A COMPLIANCE CERTIFICATE FOR OFFSITE FABRICATION OF STRUCTURAL COMPONENTS
SUCH AS PRECAST CONCRETE, GLUED LAMINATED TIMBER, AND STRUCTURAL STEEL.
4.INDEPENDENT SPECIAL INSPECTORS MUST CONDUCT ALL REQUIRED INSPECTIONS. SITE
VISITS BY THE STRUCTURAL ENGINEER OR BUILDING OFFICIAL DO NOT REPLACE OR FULFILL
THE SPECIAL INSPECTION REQUIREMENTS.
5.INSPECTION REPORTS SHALL BE SUBMITTED TO BOTH THE BUILDING OFFICIAL AND THE
ENGINEER OF RECORD (E.O.R.). FINAL REPORTS FROM SPECIAL INSPECTORS MUST VERIFY
THAT THE STRUCTURAL SYSTEM CONFORMS TO THE APPROVED DESIGN DOCUMENTS.
6.ENSURING THAT ALL REQUIRED INSPECTIONS ARE COMPLETED IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
7.WORK REQUIRING SPECIAL INSPECTION MUST BE REVIEWED BY THE DESIGNATED SPECIAL
INSPECTOR BOTH DURING CONSTRUCTION AND UPON COMPLETION. CONTINUOUS
INSPECTION REQUIRES FULL-TIME SUPERVISION, WHEREAS PERIODIC INSPECTION IS
CONDUCTED INTERMITTENTLY.
8.FOR STRUCTURAL WOOD COMPONENTS, PERIODIC INSPECTIONS ARE REQUIRED FOR
WOOD SHEAR WALLS, SHEAR PANELS, DIAPHRAGMS, AND THEIR FASTENING SYSTEMS,
INCLUDING NAILING, BOLTING, ANCHORING, AND CONNECTIONS OF SEISMIC
FORCE-RESISTING ELEMENTS SUCH AS DRAG STRUTS, BRACES, AND HOLDOWNS.
EXCEPTION: SPECIAL INSPECTION IS NOT NEEDED WHEN THE SHEATHING FASTENER
SPACING EXCEEDS 4 INCHES ON CENTER. INSPECTIONS MUST TAKE PLACE BEFORE THE
WORK IS COVERED.
9.THE SPECIAL INSPECTIONS LISTED ARE IN ADDITION TO THOSE PERFORMED BY THE
BUILDING OFFICIAL. THIS LIST IS NOT EXHAUSTIVE.
STRUCTURAL WOOD (NOTE #8)CBC 1705.12.1, 1705.13.2
CONCRETE/SHOTCRETE WORK CBC Table 1705.3
REINFORCING STEEL CBC Table 1705.2.2, 1705.3
HIGH-STRENGTH NON-SHRINK GROUT CBC 1705.2, 1705.3
REINFORCING STEEL NOTES
1.REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60 FOR ALL SIZES.
2.ALL REINFORCING TO BE ACCURATELY AND SECURELY LOCATED PRIOR TO POURING
CONCRETE.
3.ALL HORIZONTAL REINFORCEMENT TO HAVE MATCHING DOWELS AT CORNERS OF WALLS.
ALL VERTICAL REINFORCEMENT TO HAVE MATCHING DOWELS TO FOOTING, U.O.N.
4.COVERAGE SHALL BE: 3" CLEAR FOR CONCRETE CAST AGAINST EARTH, 2" CLEAR FOR
CONCRETE EXPOSED TO MOISTURE BUT NOT CAST AGAINST EARTH, AND 1 1/2" FOR ALL
OTHER CONDITIONS. (U.N.O)
GENERAL
NOTES
S-0
DESCRIPTIONREV.DATE
STAMP:
SHEET TITLE:
SHEET NUMBER:
AD
U
C
O
N
V
E
R
S
I
O
N
PROJECT:
80
5
C
L
E
M
E
N
S
E
N
A
V
E
,
S
A
N
T
A
A
N
A
,
CA
9
2
7
0
5
1 PC1 01-17-2026
ENGINEER OF RECORD:
VENKATA ROHIT GRANDHI, P.E
7823 Boxwood Ct,
Highland, CA 92346
rohith.grandi@gmail.com
09/04/202012/14/202401.18.2026
PROVIDE STAGGERED NAILING AT ALL PANEL EDGES.
SHEAR CLIPS
(A35 OR LTP4)
SHEAR WALL SCHEDULE
2022 CALIFORNIA BUILDING CODE
WALL
TYPE
SHEATHING
APA-RATED EDGE
(E.N.)
FIELD
(F.N.)
ALLOWABLE
SHEAR
(PLF)FRAMED
FLOOR CONCRETE
SILL PLATE ATTACHMENT
3/8" sheathing 8d @
6" O.C.
8d @
12" O.C.1
15/32" Struc. I
8d @
4" O.C.
8d @
3" O.C.
8d @
2" O.C.
10d @
2" O.C.
8d @
12" O.C.
8d @
12" O.C.
8d @
12" O.C.
10d @
12" O.C.
2601/4"∅x6" SDS
@ 16" O.C.
5/8" ∅ A.B. @
48" O.C.
@ 16" O.C.
@ 24" O.C.
@ 8" O.C.
@ 8" O.C.
@ 6" O.C.
(1)
(2)STUDS ARE SPACED @ 16" O.C. MAX., UNO.
NAILING
2
3
4
5
3/8" sheathing
3/8" sheathing
3/8" sheathing
1/4"∅x6" SDS
@ 12" O.C.
1/4"∅x6" SDS
@ 8" O.C.
1/4"∅x6" SDS
@ 6" O.C.
1/4"∅x6" SDS
@ 5" O.C.
5/8" ∅ A.B. @
42" O.C.
5/8" ∅ A.B. @
36" O.C.
5/8" ∅ A.B. @
24" O.C.
5/8" ∅ A.B. @
18" O.C.
380
490
640
870
15/32" Struc. I
BOTH SIDES
8d @
3" O.C.
8d @
2" O.C.
10d @
2" O.C.
8d @
12" O.C.
8d @
12" O.C.
10d @
12" O.C.
@ 4" O.C.
@ 4" O.C.
@ 3" O.C.
3D
4D
5D
3/8" sheathing
BOTH SIDES
3/8" sheathing
BOTH SIDES
1/4"∅x6" SDS
@ 4" O.C.
1/4"∅x6" SDS
@ 3" O.C.
1/4"∅x6" SDS
@ 2.5" O.C.
5/8" ∅ A.B. @
18" O.C.
5/8" ∅ A.B. @
12" O.C.
5/8" ∅ A.B. @
9" O.C.
980
1280
1740
BLK'G &
STUD SIZE
AT ADJ.
PANEL
EDGES
2x
NOTES:
3x
3x
3x
3x
3x
3x
3x
(3)FOR SHEARWALL TYPE 3D, 4D, 5D, SILL PLATE SHALL BE 3x MIN.
SHEARWALL NOTES
1.SEE SHEET S-0 FOR RELATED NOTES AND REFERENCES.
2.SHEAR WALLS CANNOT BE USED AS PLUMBING WALLS, UNLESS APPROVED BY E.O.R IN WRITING.
3.AT DOUBLE SIDED SHEAR WALLS, POST W/E.N. PER PLAN TO RECEIVE E.N. FROM BOTH SIDES.
4.WHEN MULTIPLE STUDS ARE USED INSTEAD OF A SINGLE POST, PLYWOOD SHEAR WALL TO BE
NAILED TO ALL STUDS RECEIVING HOLDOWNS.
5.DO NOT BREAK SHEAR WALL AT PERPENDICULAR WALL LOCATIONS UNLESS SPECIFICALLY
DETAILED ON PLANS. INSTALL SHEAR WALL PRIOR TO FRAMING OF PERPENDICULAR WALLS.
6.THE CONTRACTOR SHALL VERIFY THAT THE TOP OF HARDY FRAMES ALIGNS WITH THE TOP
PLATE HEIGHT SHOWN ON THE PLANS. ANY DISCREPANCIES MUST BE REPORTED TO THE
ENGINEER OF RECORD.
7.ALL SHEAR PANELS SHALL HAVE CONTINUOUS SHEATHING MATERIAL FROM ONE END TO THE
OTHER AND FROM PLATE TO PLATE AS SPECIFIED ON THE DRAWINGS. CONTRACTOR SHALL
COORDINATE FRAMING SUCH THAT CONTINUITY OF SHEAR PANELS IS ASSURED.
FRAMING SCHEDULE
POST OR TRIMMER AS NOTED
SYMBOLS LEGEND
FRAMING KEY NOTES
SHEAR PANEL LENGTH AND NUMBER.
REFER TO SHEARWALL SCHEDULE FOR PANEL TYPE
BEAM NUMBER, REFER TO E.O.R. CALCULATIONS
DIRECTION OF FRAMING MEMBER PER SCHEDULE
DETAIL SHEET NUMBER
KEY NOTE NUMBER
DETAIL NUMBER
HEADER OR DROP BEAM PER PLAN
FLUSH BEAM PER PLAN
MARK MEMBER TYPE
EXISTING FRAMING (V.I.F.)E
X
X
X
X
SD.X
DRAG DIRECTION
X
X
X
X
FRAMING AREA DIVISION
X
FRAMING NOTES
(E) PAD
PAD NUMBER PER SCHEDULE
DROP IN SLAB (VERIFY PRIOR TO CONSTRUCTION)
X
#X PAD ID, REFER TO E.O.R CALCULATIONS
X
HOLDOWN TYPE,
FOUNDATION NOTES
1.SEE SHEET S-0 FOR RELATED NOTES AND REFERENCES.
2.APPROVED PROPRIETARY ANCHORS SUCH AS MASA OR MASAP MAY BE USED WHERE
PERMITTED, IN ACCORDANCE WITH ICC-ESR #2555. MAINTAIN MINIMUM 4" END DISTANCE
3.TOP OF ALL EXTERIOR FOOTINGS, INCLUDING GRADE BEAMS, PAD FOOTINGS, AND FLAGPOLE
FOUNDATIONS, SHALL BE PLACED A MINIMUM OF 6 INCHES BELOW FINISHED GRADE.
4.HOLD DOWN HARDWARE MUST BE SECURED IN PLACE PRIOR TO FOUNDATION INSPECTION
5.ALL HOLDOWNS AND POST ANCHORS TO BE INSTALLED ACCORDING TO MOST CURRENT
SIMPSON STRONG TIE SPECIFICATIONS AND REQUIREMENTS OF ICC-ER REPORTS & SHALL BE
TIED IN PLACE PRIOR TO FOUNDATION INSPECTION. DIMENSIONS ARE NOT FURNISHED TO
SIMPSON HOLDOWNS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR'S SUPERINTENDENT,
THE FRAMING CONTRACTOR AND THE CONCRETE CONTRACTOR TO LOCATE THESE ANCHORS
IN THE EXACT LOCATION. REFER TO DETAILS FOR PROPER INSTALLATION.
6.HOLDOWN CONNECTOR BOLTS INTO WOOD FRAMING REQUIRE 0.229"X3" PLATE WASHERS
ON THE POST OPPOSITE THE HOLDOWN AND HOLDOWN SHALL BE TIGHTENED TO FINGER
TIGHT PLUS ONE HALF WRENCH TURN JUST PRIOR TO COVERING THE WALL FRAMING.
LINE OF LATERAL FORCE RESISTANCE, REFER TO E.O.R. CALCULATIONS
1.SEE SHEET S-0 FOR RELATED NOTES AND REFERENCES.
2.SEE DETAIL 3/SD.0 FOR TYPICAL HEADER W/TRIMER, U.N.O. ON PLAN.
3.ROOF WALL TOP PLATE SHOULD BE SPLICED PER DETAIL 2A/SD.0 U.N.O. ON PLANS.
4.TYPICAL STUD BEARING WALLS, 10 FT MAX HEIGHT, SHALL BE AS SCHEDULED BELOW. TYPICAL
NON-BEARING WALLS, USE 2x4 UP TO 14 FT HEIGHT OR 2x6 UP TO 20 FT HEIGHT. FOR OTHER
CONDITIONS, SEE CASE-BY-CASE DESIGN AND NOTES ON PLAN
6. TYPICAL CEILING JOISTS WITH DEAD LOAD DL = 8.0 psf, LIVE LOAD LL = 10.0 psf. FOR
OTHER CONDITIONS, SEE CASE-BY-CASE DESIGN AND FRAMING SCHEDULE
2x6
2x8
MAX CEILING JOIST SPACING (INCHES)
C.J.
STUD WALL SUPPORTING
ROOF ONLY
ONE FLOOR & ROOF
TWO FLOOR & ROOF
ONE FLOOR ONLY
2x4
MAX. STUD SPACING (INCHES)
2-2x4 2-2x62x6
24
24
16
12
24
24
24
16
24
24
24
16
24
24
24
24
2x4
MAX SPAN (FT)
20'-0"
12
N/A
N/A
15'-3"
24
12
N/A
14'-0"12'-0"9'-9"
24
16
N/A
24
24 24
24
12N/A
8'-6"
24
24
16
7'-6"
24
24
24
18'-0"
N/A
N/A
16
ALIGN STUD(S)/POST(S) WITH UPPER FLOOR STUD(S)/POST(S) AND PROVIDE SOLID
BLOCKING BETWEEN FLOOR (PROVIDE E.N. WHEN POST IS LOCATED WITHIN S.W.)
CONTINUOUS JOIST WITH EDGE NAILING AS REQUIRED.3
2
1
INSTALL SOLID BLOCKING AT LOCATIONS WHERE VERTICAL POSTS DO NOT ALIGN
CONTINUOUSLY THROUGH JOIST SPACES AND/OR BETWEEN THE TOPS OF BEAMS OR
HEADERS AND THE LOWER TOP PLATE.
(N) PAD
CJ 2 X 10 CEILING JOIST @ 16" O.C.
R1 2 X 8 ROOF RAFTERS @ 16" O.C.
(E) CONTINUOUS EDGE SLAB FOOTING
(N) CONTINUOUS EDGE SLAB FOOTING
CALIFORNIA FRAMING
DW
(N) 4x6 HDR
(N
)
4
x
6
H
D
R
5
(N
)
4
x
8
H
D
R
(N) 4x6 HDR
(N
)
4
x
6
H
D
R
(N
)
4
x
6
H
D
R
7
(N
)
3
1
/
2
"
x
1
1
1
/
4
"
L
V
L
C
L
'
G
B
M
6
(N)
4
x
1
0
H
I
P
B
M
6
(N)
4
x
1
0
H
I
P
B
M
(N
)
2
x
1
0
R
I
D
G
E
B
O
A
R
D
3
(N)
4
x
1
0
H
I
P
B
M
3
(N)
4
x
1
0
H
I
P
B
M
R1R1
R1
R1
R1
R1
RR W/EN
4A
SD.2
RR W/EN
(E) HDR
(E)
H
I
P
B
M
E
EE
CJ
4
(N) 3 1/2"x11 1/4" LVL CL'G BM
CJ
MI
N
6
'
-
0
"
RR
W
/
E
N
4A
SD.2
1
2w/
C
O
L
L
A
R
T
I
E
1
HUS
4x4
K.P.
4x4
K.P.
HHSUQ
4x4
4x
4
C
B
A
1 2 3
1
8'-0"4x
4
4x
4
1
3'-0"4x
4
4x
4
1
8'-0"4x
4
1
4'
-
0
"
4x4
2
4'
-
0
"
4x4
4x4 1
8'
-
0
"
4x4
4x4
2-2x4
TRIM
2-2x4
TRIM
2-2x42-2x4
3
SD.2
3
SD.2 5
SD.2
5
SD.2
5
SD.2
5
SD.2
5
SD.2
7
SD.2
8
SD.2
8
SD.2
8
SD.2
11
SD.2
12
SD.2
6
SD.2
6
SD.2
TYP.
7
SD.2
TYP.
15
SD.0
TYP.
14
SD.0
13
SD.0
3
SD.0
TYP.
8
SD.0
TYP.
10
SD.2
1B
SD.2
2A
SD.2
1B
SD.2
1B
SD.2
5
SD.2
13
SD.0
9
SD.2
TYP.
13
SD.2
1
2B
SD.0
1
DW
(E) SLAB ON GRADE
THICK CONVENTIONAL
SLAB AND UNDERLAYMENT
PER DETAIL 1/SD.1
5"
C
B
A
1 2 3
1
8'-0"
HD
U
2
HD
U
2
1
3'-0"
HD
U
2
HD
U
2
1
8'-0"
HD
U
2
HD
U
2
1
4'
-
0
"
HDU2
2
4'
-
0
"
HDU2
HDU2 1
8'
-
0
"
HDU2
HDU2
(E) FOOTING, TYP.
1
SD.1
1
SD.1
1
SD.1
1
SD.1
1
SD.1
4
SD.1
TYP.
5
SD.1
TYP.
6
SD.1
6
SD.17
SD.1
8A
SD.18B
SD.1
8B
SD.1
ROOF FRAMING PLAN
SCALE : 1/4" = 1'-0"
FRAMING
PLANS
S-1
DESCRIPTIONREV.DATE
STAMP:
SHEET TITLE:
SHEET NUMBER:
AD
U
C
O
N
V
E
R
S
I
O
N
PROJECT:
80
5
C
L
E
M
E
N
S
E
N
A
V
E
,
S
A
N
T
A
A
N
A
,
CA
9
2
7
0
5
1 PC1 01-17-2026
FOUNDATION PLAN
SCALE : 1/4" = 1'-0"
ENGINEER OF RECORD:
VENKATA ROHIT GRANDHI, P.E
7823 Boxwood Ct,
Highland, CA 92346
rohith.grandi@gmail.com
09/04/202012/14/202401.18.2026
DESCRIPTIONREV.DATE
STAMP:
SHEET TITLE:
SHEET NUMBER:
AD
U
C
O
N
V
E
R
S
I
O
N
PROJECT:
80
5
C
L
E
M
E
N
S
E
N
A
V
E
,
S
A
N
T
A
A
N
A
,
CA
9
2
7
0
5
1 PC1 01-17-2026
TYPICAL
DETAILS
SD.0
DOUBLE TOP PLATE
SILL PLATE
NOTE :
WHERE NOTCH IS GREATER THAN 1" PROVIDE 10 GA
STRAP W/ WIDTH SAME AS DBL TOP PL.TOP PL OF SHEAR
WALLS SHALL NOT BE NOTCHED UNLESS SPECIFICALLY
DETAILED.
8" MAX
@ SHEAR WALL
END OF SILL PL
END OF SILL PL
NOTE :
WHERE DEPTH OF NOTCH "B" OS GREATER THAN D/5 PROVIDE ANCHOR BOLT EA
SIDE OF NOTCH PER END REQUIREMENT. NO MORE THAN ONE NOTCH IS
PERMITTED IN EVERY 12'-0" @ SHEAR WALL
5" MIN.
9" MAX.
5" MIN.
9" MAX.
5" MIN.
9" MAX.
2D
MIN.
D
D/
2
D/
2
DRILLED HOLE
"B"
"B
"
D/
3
8) 16D SIDE OF
NOTCH (4PL)
5"3"5"
MAX.
NOTCH
D/
2
MA
X
.
2D
MIN.
D/
3
D/
2
D/
2
D
PLATE NOTCH AT NON SHEARWALL
DBL. TOP PLATE2-16d TOE NAIL
1/
2
"
GA
P
2x4 FLAT @ 48" O.C.
CEILING WHERE
OCCURS
2x6 BRACING W/ (3)16d EA END
@ 8'-0" WHERE WALL IS:
2x4 AND H> 14'-0"
2X6 AND H> 22'-0"
PROVIDE 2x6 CONT.
@ MIDSPAN WHERE BRACE
EXCEEDS 6'-0" W/(2) 16d
FLOOR LINE
H
TOP OF PARTITION PARALLEL
TO JOISTS
DBL. TOP PLATE
1/
2
"
GA
P
CEILING WHERE
OCCURS
FLOOR LINE
H
TOP OF PARTITION
PERPENDICULAR TO JOISTS
SIMPSON DTC
(SLOT VERTICAL)
AT EA JOIST
OR RAFTER
GAP
CEILING WHERE
OCCURS
1/2"
SIMPSON DTC
(SLOT VERTICAL)
CLIP @ EA RAFTER
SIMPSON STCT CLIP (SLOTS
VERTICAL) WHERE
REQUIRED
@ EA RAFTER
TOP OF PARTITION TO CONC. SLAB
1/
2
"
GA
P
CEILING WHERE
OCCURS
4x W/ 1/2" Ø HILTI KH-EZ
@48" O.C.
W/ 5" EMBED EA SIDE
DBL. TOP PLATE
SLAB PER PLAN
PARTITION WALL (NON-BEARING/NON-SHEARWALL)
CONCRETE FLOOR
CONDITION
WOOD FLOOR
CONDITION
1'-0"
MIN
PARTIAL SHEET AT
WALL END ONLY
STAGGER HORIZ. PANEL JOINTS, TYP OR
USE FULL HEIGHT SHEETS WHERE
POSSIBLE
1'
-
0
"
MI
N
.
WH
E
R
E
RE
Q
'
D
7"MI
N
.
EDGE NAIL TO
TOP PLATES
STAGGER NAILS
FULL SIZE
PLYWOOD
SHEET TYP.
U.N.O.
POST AT HD
EDGE NAIL TO
HOLD DOWN
POST
ANCHOR
BOLTS SEE
SCHEDULE
EDGE NAIL TO
SILL
BLK'G AT PAN
EDGES SAME
SIZE AS PANEL
EDGE STUD
FIELD NAILING
@12" O.C.
EDGE NAIL AT
PANEL EDGES
TYP STUDS
PLYWOOD
FACE GRAIN
PARALLEL
TO STUD
EDGE NAIL TO
SILL PLATE
SILL PLATE
NAILING
A35 SEE SHED.
TYPICAL SHEARWALL FRAMING ELEVATION
SHEARWALL
WHERE OCCURS
1/2"1/2"
SILL PLATE ANCHORAGE
PER SHEARWALL SCHEDULE
CONCRETE SLAB OR
PRECAST PLANK
MAX.
@SHEARWALL
APPLICABLE NOTE 2
MAX.
@SHEARWALL APPLICABLE
NOTE 2
SHEARWALL SHEATHING SEE
PLAN AND SCHEDULE
PLATE WASHER
3 GA x 3 x 3- .23 MIN THICKNESS
NOTES:
1. INSTALL SILL PLATE ANCHORAGE AS SHOWN AND AT SPACING
INDICATED IN WOOD SHEARWALL BASE CONNECTION SCHEDULE.
2. STAGGER ANCHORS AT DOUBLE SIDE SHEARWALL
WOOD SHEARWALL SILL PLATE ANCHORAGE
16d @24" O.C. TYP.
DOUBLE STUDS DOUBLE STUDS
WALL INTERSECTION
NOTCHING & BORING - CONV. JOIST
NOTES:
1) FOR SOLID SAWN JOISTS, NOTCHED TO BE @ OUTER 1/3 SPAN ONLY.
2) MAINTAIN MIN. 6" SPACING BETWEEN NOTCHES/ BORED HOLES.
JOIST DEPTH
MAX
2" CLEAR TO
EDGE OF JOIST.
1/3 OF JOIST
DEPTH MAX.
1/6 OF JOIST
DEPTH MAX.
1/3 OF JOIST
SPAN MAX.
PIPE OR
CONDUIT.1/6 OF JOIST
DEPTH MAX.
1/3 OF JOIST
DEPTH MAX.
1/3 OF JOIST
SPAN MAX.
JOIST DEPTH.
40% MAX. STUD
WIDTH NOTCH
60% MAX. STUD
WITH BORE
40% MAX. STUD
WIDTH NOTCH
60% MAX. STUD
WITH BORE
NON BEARING STUDS BEARING STUDS
NOTCH/BORE
% OF STUDS
25%
40%
60%
2 x 4 2 x 6
7/8"
1 3/8"
2"
1 3/8"
2 1/8"
3 1/4"
NOTES:
1. NOTCHING AND BORING SHOULD NOT OCCUR IN SAME STUD SECTION
2. NO MORE THAN TWO SUCCESSIVE DOUBLE STUDS MAY HAVE 60% MAX
BORING HOLES
5/8" MIN.
DISTANCE TYP.
ALL STUD
1 1/2"
1 1/2"
STUD NOTCHING/BORING LIMITS
5/8" MIN.
DISTANCE TYP.
ALL STUD
4'
-
0
"
M
A
X
WOOD JOISTS PER PLAN
SHEATHING PER PLAN
MSTA30 W/2x BLOCK TYP. @
CORNER
DOUBLE JOISTS
TAIL JOIST
HANGER PER PLAN
BOUNDARY NAILING
1" MIN
PENETRATION
COMMON NAILS @ 6" O.C. EACH FACE
TOP AND BOTTOM
WEB STIFFENER AT
HANGER (I-JOIST ONLY)
SECTION OF DOUBLE JOIST
PLAN VIEW
NOTE:
SEE ARCHITECTURAL, PLUMBING, MECHANICAL AND
ELECTRICAL DRAWINGS FOR SIZE AND LOCATION OF
OPENING
TYPICAL DIAPHRAGM OPENING
1
3
5
6
711
10
9
EQ.
NAIL SPLICE
SIMPSON STRAP
PER SCHEDULE
SPLICED
OVER STUDS
MARK
A
B
NO. OF NAILS
NAIL SPLICE
TYPICAL SPLICE TOP PLATE
EQ.
(2) 2x TOP PLATE
@ RAKE WALL
STRAP PER
SCHEDULE
ALT. STRAP SPLICE
MIN. LAP (FT)
ALT. STRAP
SPLICE
C
D
E
F
G
10
16
22
24
32
36
42
4
4
6
6
8
8
8
ST22
ST6224
ST6236
MST37
MST48
MST60
CMST12-72"
ALL NAILS ARE 16d SINKER OR 10d COMMON
NAILS PER SCHEDULE EQUALLY SPACED,
STAGGERED
SPLICED OVER STUDS
TOP PLATES
STUDS PER PLAN
4'-0" MIN. LAP 4'-0" MIN. LAP
NAILS PER SCHEDULE EQUALLY SPACED,
STAGGERED
2
NOTES:
1) NAILS SHALL BE DRIVEN TIGHT BUT SHALL NOT FRACTURE SURFACE OF SHEATHING.
2) PLYWOOD OSB PIECES SHALL CONTAIN NOT LESS THAN 8 SQ. FT. NOR BE LESS THAN 2-0" WIDE.
3) MAXIMUM UNSUPPORTED SHEATHING TO BE 24".
4) FRAMING AT ADJOINING PANEL EDGE SHALL BE 3" NOMINAL OR WIDER AND NAILS AT ALL PANEL
EDGES SHALL BE STAGG. WHERE PANEL EDGE NAILING IS SPECIFIED AT 2 1/2" 0.C. OR LESS
5) ALL PANEL EDGES OF THE FLOOR SHEATHING SHALL HAVE APPROVED T AND G JOINTS OR SHALL
BE SUPPORTED BY BLK'G. PER IBC TABLE 2304.8(3) IN 2022 CBC.
4'-0"x8-0" SHEETS,
STAGG. AS SHOWN
EDGE NAILING
FIELD NAILING
DIRECTION OF FACE
GRAIN PERPENDICULAR
TO SUPPORT
GAP
PANEL JOINT
2x MIN.
FRAMING
EDGE NAILSSHEATHING
PLAN
DISCONTINUOUS EDGE
W/2x MIN. FRAMING BLK'G
CONT. EDGE W/2x MIN.
BLK'G. AT BLOCKING
DIAPHRAGM
JOIST PER PLAN
CONT. EDGE W/0 BLK'G.
@ UNBLK'G. DIAPHRAGM
1/8"
ROOF OR FLOOR SHEATHING LAYOUT
SIMPSON A34 AT OPENING
WIDER THAN 8'-0"
(2)16d MIN. (ADD (2)16d
FOR EA. 2" OF ADDITIONAL
HEADER DEPTH)
OPENING
WIDTH MAX.
MIN. NOMINAL
HEADER ''D''
HEADER SCHEDULE
4'-0"
6'-0"
8'-0"
10'-0"
12'-0"
4"
6"
8"
10"
12"
SILL PL
2x WINDOW SILL WHERE
OCCURS (2)2x SILL AT
OPENING WIDER THAN 4'-0")
2x STUDS PER SCHEDULE
ON PLAN
DOUBLE STUDS OR POST
PER PLAN
WIDTH SAME AS
STUD WIDTH SOLID BUILT-UP
(AT OPENINGS
UP TO 6'-0" ONLY)
''
D
'
'
HD
R
DE
P
T
H
2x EA. SIDE AND
CONT. PLYWD. SHIM
w/ 16d @ 12"o.c. EA.
SIDE STAGGER
(2)2x TOP PL'S
HEADER PER
SCHEDULE
U.N.O. ON PLANS
TRIMMER PER SCHEDULE,
U.N.O. ON PLANS
16d @ 12"o.c.
STAGGER
(2)10d TOE
NAILS
TYPICAL STUD WALL FRAMING AT OPENING DETAIL
HEADER PER
SCHEDULE
U.N.O. ON PLANSTRIMERS
4" WALL 6" WALL
2x4
2x4
2-2x4
2-2x4
2-2x4
2x6
2x6
2x6
2-2x6
2-2x6
STUDS WALL
2x LEDGER
w/ (2) 16d'S NAIL @ 16"
OC INTO STUDS
NEW CEILING JOIST
PER PLAN.
2x LEDGER
w/ (2) 16d'S NAIL @ 16"
OC INTO STUDS
NEW CEILING JOIST
PER PLAN.
1/2" DRYWALL AT
BOTTOM OF
CEILING JOISTS
CEILING JOIST PARALLEL TO WALL
SIMPSON HANGER JOIST.
CEILING JOIST PERPENDICULAR TO WALL
CEILING JOIST TO WALL DETAIL
2x RIDGE BOARD W/ DEPTH GREATER
THAN JACK RAFTER
2x CALI. FRAMING RAFTER
USE 2x4 @24" O.C. FOR MAX SPAN 4'-0"
USE 2x6 @24" O.C. FOR MAX SPAN 8'-0"
W/(3) 8d TOE NAILS TO VALLEY PLATE
2x VALLEY PLATE W/(3) 16d
INTO EACH RAFTER OR TRUSS
ADD 2x4 STRUT FROM JACK RAFTER TO
RAFTER OR TRUSS BELOW TO LIMIT CALI.
FRAMING RAFTER SPAN
ROOF TRUSSES OR RAFTER PER PLAN
NOTE:
- USE PRE-FAB. STEP-DOWN TRUSSES
PERPENDICULAR TO ROOF TRUSSES
IN-LIEU OF 2x JACK RAFTERS
CALIFORNIA FRAMING
PLYWOOD AT
DOUBLE-SIDED WALL
POST AT PER PLAN16d @ 12" O.C. FOR 2x STUD
20d @ 6" O.C. FOR 3x STUD
INTERSECTION w/ POST
16d @ 12" O.C.
INTERSECTION w/o POST
OUTSIDE CORNER w/ POST
POST AT PER PLAN
PLY. CONT. THRU
WALL INTERSECTION
ATDOUBLE-SIDED
WALL
2x OR 3x STUD AS
REQ'D., TYP. PER
S.W. SCHED.
16d @ 12" O.C. FOR 2x STUD
20d @ 6" O.C. FOR 3x STUD
OUTSIDE CORNER w/o POST
16d @ 12" O.C.
DOUBLE 2x, MIN.
NOTE:
SEE FRAMING PLAN FOR SHEAR WALL LOCATIONS, ORIENTATIONS AND SCHEDULE REFERENCES
SHEARWALL @ INTERSECTION
13
14
NOTCH @ BEAM
DE33
BEAM DEPTH
PER PLAN
NOTCH TO MATCH
ROOF SLOPE,
(DO NOT OVER CUT)
MIN. 5" FOR 14" DEEP BEAM &
MIN. 4" FOR 11 7/8" DEEP BEAM.
BEAM PER PLAN TO BE
NOTCHED AS SHOWN
MIN. 3" FOR 9 1/2" DEEP BEAM.
15
ENGINEER OF RECORD:
VENKATA ROHIT GRANDHI, P.E
7823 Boxwood Ct,
Highland, CA 92346
rohith.grandi@gmail.com
09/04/202012/14/202401.18.2026
DESCRIPTIONREV.DATE
STAMP:
SHEET TITLE:
SHEET NUMBER:
AD
U
C
O
N
V
E
R
S
I
O
N
PROJECT:
80
5
C
L
E
M
E
N
S
E
N
A
V
E
,
S
A
N
T
A
A
N
A
,
CA
9
2
7
0
5
1 PC1 01-17-2026
FOUNDATION
DETAILS
SD.1
STUD WALL
SIMPSON PHNW SERIES
0.145Ø PINS @ 16" O.C.
INSTALLED IN ACCORDANCE
WITH ICC ESR - 2138
NON - BEARING INTERIOR WALL
SLAB PER PLAN
3
2
1
5
le
le
6"
MIN.
6"
MIN.
3"
CL
R
TY
P
.
EXTERIOR
NEW HOLDOWN, PER TABLE.
THREADED ROD (THRU BOLT)
W/ HEAVY HEX NUT TACK
WELDED TO PLATE WASHER.
SEE SCHEDULE FOR PLATE
SIZE. ALT. TO TACK WELDING
APPLY DOUBLE HEX NUTS TO
SECURE PLATE WASHER.
NOTCH CONC. ALONG FTG. LENGTH TO 6" MAX.
EA. SIDE OF HOLDOWN/ ROD. DO NOT CUT FTG.
HORIZ. REINF. SOLID GROUT, WITHOUT ANY VOID,
WITH HIGH STRENGTH NON-SHRINK
GROUT W/ f'c=5000 psi MIN. CONT. SPECIAL
INSPECTION IS REQUIRED.
THREADED ROD (THRU BOLT) W/ HEAVY HEX NUT
TACK WELDED TO PLATE WASHER. SEE SCHEDULE
FOR PLATE SIZE. ALT. TO TACK WELDING APPLY
DOUBLE HEX NUTS TO SECURE PLATE WASHER.
2 1/2" THK. MIN. DRY PACKED
NON-SHRINK GROUT ALL AROUND.
SURFACE IN CONTACT WITH GROUT
SHALL BE CLEANED, FREE OF
GREASE AND LAITANCE.
PROVIDE MIN. 3" CONC./NON-SHRINK
GROUT COVER ALL AROUND
FOR ALL METAL PARTS.
THREADED ROD (THRU BOLT) W/ HEAVY HEX
NUT TACK WELDED TO PLATE WASHER.
SEE SCHEDULE FOR PLATE SIZE. ALT. TO
TACK WELDING APPLY DOUBLE HEX NUTS
TO SECURE PLATE WASHER.
NOTCH CONC. ALONG FTG. LENGTH
TO 6" MAX. EA. SIDE OF HOLDOWN/ ROD.
DO NOT CUT FTG. HORIZ. REINF. SOLID GROUT,
WITHOUT ANY VOID, WITH HIGH STRENGTH
NON-SHRINK GROUT W/ f'c=5000 psi MIN.
CONT. SPECIAL INSPECTION IS REQUIRED.
BOLT THROUGH FTG. BOTT.
2 1/2" THK. MIN. DRY PACKED NON-SHRINK
GROUT ALL AROUND. SURFACE IN CONTACT
WITH GROUT SHALL BE CLEANED, FREE OF
GREASE AND LAITANCE.
MULTI-STUD
OR POST PER PLAN
2 1/2" THK. MIN. DRY PACKED NON-SHRINK
GROUT ALL AROUND. SURFACE IN CONTACT
WITH GROUT SHALL BE CLEANED, FREE OF
GREASE AND LAITANCE.
HOLDOWN RETROFIT DETAIL
INTERIOR
HDU2 & HDU5 2 1/2" SQ.x1/4"18"
HDU8
HDU 11
5/8" Ø
7/8" Ø
1" Ø
3 1/4" SQ.x3/8"
4" SQ.x3/8"
18"
24"
IeASTM-A36 ROD Ø A36 PLATE
WASHERHD. REPLACE
EQ.EQ.
EMBED.
4"
5 1/4"
BOLT SIZE
1/2"Ø
5/8"Ø
EMBED.
2", 2X4 WALL
3 1/2", 2X6 WALL
EMBED.
PLATE WASHER
PER NAILING & HARDWARE
NOTES ON S-0 SHEETS.
PLATE WASHER
PER NAILING & HARDWARE
NOTES ON S-0 SHEETS.
PERIODIC SPECIAL INSPECTION IS
REQUIRED FOR ANCHOR INSTALLATION.
ANCHOR BOLT TO EXISTING FOOTING
(2)1/2"Ø SIMPSON TITEN HD (ICC ESR#2713) OR
ANCHOR BOLTS PER SCHEDULE W/SIMPSON SET - 3G
(ICC ESR#4057). THE SPACING PER SHEARWALL
SCHEDULE ON PLAN
7
8 STANDARD HOOKS AND BENDS
D
12
d
D
D D45°
45°90°4d OR
2 1/2" MIN
180°
D= 6d FOR #3 THRU #8
D= 8d FOR #9, #10 AND #11
D= 10d FOR #14 AND #18
ALL REINFORCING EXCEPT COLUMN TIES AND BEAM STIRRUPS
D
D
6d
O
R
3'
M
I
N
.
d
180°
D
D
d
135°
6d O
R3' M
I
N
.
D
D
d
12d
90°
STIRRUP STIRRUP OR TIE
D= 4d FOR #3, #4 AND #5
D= 6d FOR #6, #7 AND #8
d
135°
6d
O
R
3'
M
I
N
.
D D
90°
6d O
R
3' M
I
N
.
d
180°90°
D D
6d
O
R
3'
M
I
N
.
6d OR
3' MIN.
BEAM OR COLUMN CROSSTIES
BEAM STIRRUPS AND COLUMN TIES
NOTES:
TIES AND CROSSTIES FOR SHEARWALL
BOUNDARY ELEMENTS SHALL BE DETAILED AS
COLUMN TIES/CROSSTIES
TYPICAL EXTERIOR FOOTING
8"
DE
P
T
H
=
2
4
"
SHEARWALL
WHERE OCCURS
PER PLAN
2X STUDS
PER PLAN
MI
N
N.G.
E.N.
CONT. G.I. WEEP
SCREED TYP.
(26 GAGE MIN)
E.N.
2- #5
OR 3- #4
T&B
5" CONC. SLAB ON GRADE PER PLAN
W/ #4 REBARS @ 18"O.C. EW.
OVER 4” BASE OF ½” OR LARGER CLEAN
AGGREGATE WITH 10 MIL VAPOR RETARDER
OVER 90% COMPACTED FILL.
REINFORCEMENT TO BE PLACED AT CENTER
OF SLAB
12"
7" EMBEDMENT MIN.
24" LAP SPLICE
DOWELS #4 @ 16" O.C. MIN.
(OMITTED FOR MONO POUR)
2X P.T. SILL PLATE (U.N.O) W/ A.B.
PER NAILING & HARDWARE
NOTES, SHEET S-0
3"
CL
R
.
FOOTING/GRADE BEAM REINF. @CORNER
STANDARD HOOK. TYP.
FOOTING/ GRADE BEAM
CORNER REBAR. TYP.
CLASS "B" LAP SPLICE
STANDARD
HOOK.
NOTES:
1. SEE TYP. DETAIL FOR REINFORCING IN STEM WALL
2. ONLY CORNER REBAR SHOWN ON THIS DETAIL.TERMINATE
REMAINING REBAR WITH STANDARD HOOK.
NOTES:
1.REFER TO DETAIL 1/SD.1 FOR ADDITIONAL INFORMATION.
2.UNLESS OTHERWISE NOTED, ANCHOR BOLTS SHALL BE SECURED IN POSITION PRIOR TO PLACING FOUNDATION CONCRETE.
3.CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND DETERMINING THE REQUIRED LENGTHS OF REINFORCEMENT BARS,
TAKING INTO ACCOUNT ALL CONDITIONS SHOWN ON THE DRAWINGS AS WELL AS THE MEANS AND METHODS OF
CONSTRUCTION TO BE USED.
INTERIOR CONDITION
EXTERIOR CONDITION
3"
TO
T
A
L
B
O
L
T
L
E
N
G
T
H
3"
1/2" GAP AT INSTALLATION
OF "HDU". RETIGHTEN BOLT
IMMEDIATELY PRIOR TO
COVERING OF WALL
EQ.EQ.
MIN. SQ PAD
PER SCHEDULE
TO
T
A
L
B
O
L
T
L
E
N
G
T
H
3"
EQ.EQ.
5"
Le
A.B.
EMBED. Le
SIMPSON
PRE-ASSEMBLED
ANCHOR BOLT
7"PAB5
8"PAB5
11"PAB7
14"PAB8
14"PAB8
16"PAB10
CL
R
TYPICAL HOLDOWN DETAIL
HD19
HDU14
HDU11
HDU8
HDU5
HDU2
1-1/4"
1"
1"
7/8"
5/8"
5/8"
HOLDOWN
TYPE
A.B.
DIAMETER
SIMPSON
HOLDOWN
5"
Le
℄
MIN. SQ PAD
PER SCHEDULE
℄
WOOD POST PER PLAN
WOOD POST PER PLAN
SIMPSON HOLDOWN
MIN. PAD SIZE
CL
R
2'-0" SQ. w/(3) #4 E.W
2'-0" SQ. w/(3) #4 E.W
2'-6" SQ. w/(4) #4 E.W
3'-0" SQ. w/(4) #4 E.W
3'-0" SQ. w/(4) #4 E.W
3'-6" SQ. w/(5) #4 E.W
ADD'L BARS
@ CENTER OF HD
-
-
(1)#4 @ T&B (L=6FT)
(1)#4 @ T&B (L=6FT)
(1)#5 @ T&B (L=6FT)
(1)#5 @ T&B (L=8FT)
1
3
/
4
"
TO
2
"
EXISTING FOUNDATION
MIN. 6" EMBEDMENT OF
DOWELS INTO EXISTING
CONCRETE W/ SIMPSON SET-3G
, ESR #4057. PERIODIC
SPECIAL INSPECTION IS REQ'D.
CL
R
.
TY
P
.
NEW FOOTING PER PLAN
EXISTING FOUNDATION
MIN. 6" EMBEDMENT OF
DOWELS INTO EXISTING
CONCRETE W/ SIMPSON SET-3G
, ESR #4057. PERIODIC
SPECIAL INSPECTION IS REQ'D.
NEW SLAB PER PLAN
2#4 DOWELS @ T&B
OVERLAP MIN. 24"
#4 DOWELS @ 18" O.C. BENT
AS SHOWN IN FOOTING &
OVERLAP MIN. 24" AS SHOWN
IN SLAB
ADDITION OF FTN'G./SLAB AT EXISTING FOUNDATION
3"
1
3
/
4
"
TO
2
"
24"
COND. B
COND. A
1
1
1
ENGINEER OF RECORD:
VENKATA ROHIT GRANDHI, P.E
7823 Boxwood Ct,
Highland, CA 92346
rohith.grandi@gmail.com
09/04/202012/14/202401.18.2026
DESCRIPTIONREV.DATE
STAMP:
SHEET TITLE:
SHEET NUMBER:
AD
U
C
O
N
V
E
R
S
I
O
N
PROJECT:
80
5
C
L
E
M
E
N
S
E
N
A
V
E
,
S
A
N
T
A
A
N
A
,
CA
9
2
7
0
5
1 PC1 01-17-2026
STRUCTURAL
DETAILS
SD.2
EQ
.
EQ
.
COLUMN CAP CONDITION (A)STRAP CONDITION (B TO E)
POST PER PLAN
SIMPSON EPCZ
BEAM
PER PLAN
STRAP
EACH SIDE
OVERALL
LENGTH CAPACITY (LB)
B
C
(1) CS16
(2) CS16
26"
26"
MARK
3410
6820
D
E
(1) CMSTC16 40"
40"
9380
18760(2) CMSTC16
NOTES:
1.REFER TO SIMPSON SPEC. FOR STRAP NAILING
2.NAIL TO ALL STRAP HOLES
STRAP SCHEDULE
POST & BEAM CONNECTION
DRAG DETAIL
CAPACITY(LB)
1705
3410
4690
647510d @ 3 1/2"
10d @ 3"
8d @ 4 1/8"
8d @ 4 1/8"
NAIL SIZE AND SPACINGEND LENGTH
26"
26"
40"
60"CMST14
CMSTC16
(2) CS16
CS16
STRAP TYPE
D
C
B
A
FLUSH BEAM
SIMPSON STRAP
PER SCHEDULE W/
TWO ROWS
OF NAILS FOR EA.
STRAP
POST PER PLAN, 2-2X MIN.
DROP BEAM
ALT. LOCATION FOR
CMST TRAP
SIMPSON STRAP
PER SCHEDULE W/ TWO ROWS
OF NAILS FOR EA. STRAP
POST PER PLAN, 2-2X MIN.
MARK
3.5" MIN. WIDE MEMBER FOR CONDITION C & D
STRAP SCHEDULE
SPACING
AND LENGTH
SEE TABLE
SPACING
AND LENGTH
SEE TABLE
A
STRAP END LENGTH
CS16 26"
B (2)CS16 26"
DRAG DETAIL
MARK NAIL SIZE AND SPACING
8d@ 4 1/8"
8d@ 4 1/8"
CAPACITY (LB)
1705
3410
ROOF RAFTER OR
TRUSS CHORD
2x BLOCKING W/E.N.
ROOF RAFTER PER
PLAN W/ E.N.
ROOF SHEATHING
ATTACH 2x4x36" LONG TO TRUSS CHORD OR
CONDITION B. W/16d @ 4" O.C. STAGGERED.
END L
E
N
G
T
H
3
2
15
6
7
9
10
ROOF RAFTER TO HIP BEAM
A
A
HIP BEAM
PER PLAN USE SIMP. HANGER
WHERE RAFTER SPAN
EXCEED 8'-0"
ROOF SHEATHING
B.N.B.N.
A-A @ HIP BEAM
HIP/ VALLEY BEAM PER
PLAN
(5) -16d TOE NAIL E.A.
END TO BEAM
TYP. 2x ROOF RAFTER
WHERE OCCUR
(5) -16d TOE NAIL E.A.
END TO BEAM
HIP BEAM PER PLAN
SIMPSON TS22 EACH SIDE
OF BEAM TO POST
POST PER PLAN
DBL. TOP PLATE
WHERE OCCURS
CONNECTION DETAIL
NOTE:AS AN ALTERNATE TO TS (TWIST
HIP BEAM PER PLAN
SIMPSON HCP
DBL. TOP PLATE
WHERE OCCURS
STRAP) USE SIMPSON HCP (HIP
TO DOUBLE TOP PLATE).
POST PER PLAN
11
RIDG
E
B
R
D
PER
P
L
A
N
WOOD
C
L
G
B
M
P
E
R
P
L
A
N
SIMPSON ECC
COLUMN CAP
SIMPSON HL33
HEAVY ANGLE
SIMPSON "HRC"
HIP RIDGE CONNECTOR
RIDGE BEAM TO HIP BEAM CONNECTION
HIP BM
PER PLAN
TOP VIEW
2x F.H. BLOCKING
SHEAR PANEL
PER PLAN
DBL TOP PLATE
OR DROP BM PER PLAN
5-16d NAILS
RAFTERS TO C.J.
ROOF SHEATHING
16d TOE NAILS @ 8" O.C. TYP.
U.O.N
R.R. PER PLAN.
CEILING JOISTS
PER PLAN
H2.5A @ 48" O.C.
SHEAR TRANSFER
HDR WHERE OCCURS
2x STUD
B.N.
B.N.
A35 PER SHEAR WALL
SCHEDULE
E.N.
2x CONT. FASCIA
w/ 2-16d FACE NAILS
TO EACH RAFTER
COLLAR TIE CONNECTION DETAIL
EQ EQ
H
E.N.E.N.
SIMPSON ST22 STRAP
@ EACH R.R.
5-16d FACE NAILS
CEILING JOIST PER PLAN @ 16" O.C. (UNO)
L=18'-0" MAX.
E.N.E.N.
ROOF SHEATHING
2X RIDGE BOARD PER PLAN
2X R.R. PER PLAN
REFER TO DETAIL
5/SD.2
REFER TO DETAIL
5/SD.2
H
/
3
2x6 COLLAR TIE @
48" O.C.
5-16d FACE NAILS
AT EA. ENDS
USE LRUZ HANGERS WHEN SPAN OF
RAFTERS EXCEED 10'-0" OTHERWISE
USE MIN. (5) 16d TOE NAILS @ EACH
RAFTER TO RIDGE
EQ.EQ.
STRAP SPLICE
SIMPSON ST6224 STRAP (U.N.O.)
EXISTING STUD
SPLICE TOP PLATE
EXISTING
TOP PLATES
NEW
TOP PLATES
NEW STUD
SHEAR TRANSFER
(N) ROOF SHEATHING
(N) CALIFORNIA FRAMING
(E) ROOF RAFTER PER PLAN
(N) SHEAR PANEL
(WHERE OCCURS)
EXTEND SHEAR PANEL
(N) ROOF RAFTERS
(E) DBL. TOP PLATES
(E) STUD
WALL
(N) 2x BEVELED PLATE W/16d's @ 6" O.C.
(N) ROOF RAFTER
W/SIMPSON A35
@ 24" O.C.
B.N.
(N) 2x CRIPPLE
WALL
(N) A35 PER SHEAR
WALL SCHEDULE
(AT NON-SHEAR
WALL, @ 48" O.C.
MAX.)
E.N.
E.N.
E.N.
(N) CEILING JOISTS
(E) CEILING JOISTS
(E) ROOF SHEATHING
E.N.
E.N.
SHEAR TRANSFER DETAIL
(N) ROOF
SHEATHING.
BN.
CALIF. FRAMING.
2X ROOF RAFTERS
E.N.
E.N.
E.N.
2X BLK'G W/E.N.
CL'G BEAM
PER PLAN
ROOF SHEATHING.
APPROVED HANGER
(N) 2X ROOF
RAFTERS
CL'G JOIST W/ APPROVED
HANGER PER PLAN
(WHERE OCCURS)
2X CRIPPLE WALL
SHEAR PANEL
TYPE 1
DBL TOP PLATE
(N) 2X CEILING
JOIST PER PLAN
12
SIMPSON A34
(4)16d EACH
SIDE TO BM
MULTI-STUD OR
POST, SEE PLAN
SIMPSON A34 TYP.FLUSH BEAM
SILL PLATE
MULTI-STUD OR
POST, SEE PLAN
PLYWOOD SHEATHING
BEAM TO WALL DETAIL
2x STUD AT EACH
SIDE w/ 16d AT
12"o.c. STAGGERED
EQ.EQ.
DROP BEAM PER
PLAN
ST6236 STRAP
CONDITION A
CONDITION B
DROP RIDGE BEAM
PER PLAN
ROOF RAFTER OR BM.
W/ EDGE NAILING PER PLAN
ROOF RAFTER OR BM.
W/ EDGE NAILING PER PLAN
APPROVED HANGER
SIMP. STRAP ST6236
DRAG DETAIL
SIMP. STRAP ST6236
ROOF RAFTER WITH E.N.
PER PLANFLUSH RIDGE BEAM
PER PLAN
13
1
1
ENGINEER OF RECORD:
VENKATA ROHIT GRANDHI, P.E
7823 Boxwood Ct,
Highland, CA 92346
rohith.grandi@gmail.com
09/04/202012/14/202401.18.2026
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Submittal Criteria Form
Required for Single Family or Duplex Residences
(Use Commercial form for lots with 3+ dwelling units or new residential tracts)
Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification.
Project Information
New Single Family Residence/Duplex Addition/Remodel ADU Other
Address:
Unit #: City or Unincorporated County Area: ZIP:
Scope of Work:
Existing
Area:
Area to
be Added:
Total Resulting
Area:
Stories: Area Added in Past 2 Years
(excluding this project):
Yes No Questionnaire OCFA Plan Type if “Yes”
1. New – Is this a new single family residence or duplex? *(PR160) Residential Site
with Water Availability
(PR400-402) Fire Sprinkler
2. ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has
fire sprinklers or a house that will have fire sprinklers added as part of this project?
(PR400-402) Fire Sprinkler
3. Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire
sprinkler retrofit based on a threshold set by local ordinance?
(PR400-402) Fire Sprinkler
4. Distance – Is the most remote portion of the addition, ADU or other detached structure greater than
140-feet from the fire access roadway?
*(PR160) Residential Site
5. Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non-
sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all
enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet?
*(PR160) Residential Site
with Water Availability
6. Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or
removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed
contractor to determine if a fire sprinkler modification is needed.
(PR400-402) Fire Sprinkler
7. Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a
garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold
set by local ordinance?
*(PR160) Residential Site
(PR400-402) Fire Sprinkler
8. Gate – Is a gate being installed across a driveway or road that is designated as a fire department
access roadway, or a driveway or road that serves more than a single home/duplex?
(PR180) Gate
9. Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal
Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas
seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only
applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000
sf, and ADU’s).
*(PR160) Residential Site
*(PR172-174) Methane
Test/Mitigation Plans
10. Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to
slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation,
or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as
defined by the State, or (D) near an area that could be affected by a wildfire in the open space.
*(PR125) Fuel Modification
(PR182) Accessory
Structure
*OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals.
Applicant Certification
I certify, under penalty of perjury, under the laws of the State of California, that the information above is true:
Print Name:_______________________________________ Signature:___________________________________________ Date:______________
Phone Number:_____________________________________________ Email:_____________________________________________________________
Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a
written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required.
______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes”
and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral
Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination.
For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100
SFR
ORANGE UNIFIED SCHOOL DISTRICT
CERTIFICATE OF COMPLIANCE
PAYMENT OF SCHOOL IMPACT FEES
Applicant/Owner Information
Applicant Name: Lillian Granillo
Property Owner Name:
Project Information
CITY OF SANTA ANA
Planning a� l Agency
FOR PER ,S ANCE
Master ID:
Date:,
Phone Number: (909) 241-2095
Phone Number:
Project Address: 805 E Clemensen Ave, Santa Ana Ref. Number: 101125421
Project Type: Accessory Dwelling Unit (ADU)
uare Footage: 716 Rate per sq/ft: 0 Developer Fee Total: $0
Developer Fee Determination
❑ Developer fees have been paid in full If waived, reason:
® Developer fees are waived Attached ADU under 750sf
Additional notes:
I certify that the above representations are true and correct. I agree that if it is later determined that such
representations are not true, then this Certificate of Compliance shall automatically terminate, and the
appropriate City/County shall be notified.
NOTICE: The 90-day period in which you may protest the fee described herein will begin on the date this fee is
paid. However, if the fee was imposed by the City or County as a condition of approval for your project, and
you have received the requisite notice, the 90-day protest period began at the time your project was
approved by the City or County.
Owner/Applicant Signature
District Office Use
This certifies that the above -named applicant or owner has paid school impact fees in compliance with
Education Code Section 17620 et seq. and Government Code Section 65995 et seq.
OUSD Authorized Agent Sign a Date
Rev. 03/2026
Page 1 of 1
EXISTING ONE & TWO FAMILY DWELLINGS
ELECTRICAL SERVICES UNDERGROUND
EXCEPTION
CEC 2022 ELC-04
All new utility connections are required to be installed below grade by Santa Ana Municipal Code 41-
626(b). There is a standing exception for one and two family dwellings. This exception
applies only when the new electrical service is designed to be fed from below grade as well as
overhead.
This diagram is a typical unit. The utility is able to feed this cabinet from the top or the bottom without
interfering with the distribution wiring. All the circuit breakers and branch circuits are contained in the
circuit breaker side of this cabinet.
Only listed combination overhead and underground feed service boxes may be used to connect to
an overhead utility drop. This exception to an underground fed service applies only to existing single
family and two family residences.
Planning & Building Agency
Permits & Plan Check Section
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
Rigid
Conduit
Service
Entrance
Conductor
Riser
Underground
Service
Lateral
METER
Rev. 1/21/2020
ORANGE UNIFIED SCHOOL DISTRICT
CERTIFICATE OF COMPLIANCE
PAYMENT OF SCHOOL IMPACT FEES
.Applicant/finer Information
CITY OF SANTA ANA
Planning and Building Agency
d
FOR UANCE
�aBzrsts�w� ��
Master ID:
Date:
Applicant Name: Lillian Granillo Phone Number: (909)241-2095
I Property Owner Name: Phone Number:
I�ro�ectInfortnation '.
Project Address: 805 E Ctemensen Ave, Santa Ana Ref. Number: 101125421
Proiect Tvoe: Accessory Dwelling Unit fADUt
re Footage: 716
Rate per sq/ft: 0 I. Developer Fee Total: $0
Developer Fee Determination
D Developer fees have been paid in full if waived, reason:
® Developer fees are waived Attached ADU under 750sf
Additional notes:
1 certify that the above representations are true and correct. I agree that if it is later determined that such
representations are not true, then this Certificate of Compliance shall automatically terminate, and the
appropriate City/County shall be notified.
NOTICE: The 90-day period In which you may protest the fee described herein will begin on the date this fee is
paid. However, if the fee was imposed by the City or County as a condition of approval for your project, and
you have received the requisite notice, the 90-day protest period began at the time your project was
approved by the City or County.
do
Owner ,p icantSignature
District Office Use
This certifies that the above -named applicant or owner has paid school impact fees in compliance with
Education Code Section 17620 et seq. and Government Code Section 65995 et seq.
i
OUSD Authorized Agent Sign a Date