HomeMy WebLinkAbout2909 S Daimler St - TI - PlanWH
FD
FD
UP UP
UP
UP
UP
WH
FD
FD
UP UP
UP
UP
UP
EXISTING PLANNING & BUILDING TABULATIONS
SCOPE OF WORK
INTERIOR TENANT IMPROVEMENT:
1 -CONVERSION OF PORTION OF EXISTING STORAGE ROOM TO YOUTH ASSEMBLY ROOM AND HALLWAY
2 -CONVERSION OF EXISTING HALLWAY / VACANT SPACE TO NURSERY (AND CONVERSION OF EXISTING NURSERY TO STORAGE)
INCLUDING:
• CONSTRUCTION OF INTERIOR PARTITIONS & DOORS
• MODIFICATION OF EXISTING MECHANICAL & LIGHTING SYSTEMS
• INSTALLATION OF (2) NEW ROOFTOP MECHANICAL UNITS
NOTE -THIS SCOPE OF WORK HAS BEEN APPROVED UNDER CUP 2022-13. MINOR MODIFICATION TO NURSERY LOCATION IS PROPOSED, AS CLARIFIED BY THE DIAGRAM BELOW, IN ORDER TO MAINTAIN EXISTING
LUNCH ROOM IN CURRENT FOOTPRINT. NO CHANGE TO BUILDING ENVELOPE, AREA, OCCUPANCY TYPE OR EXITS -SEE SHEET A0.2 FOR FULL EXITING DIAGRAM.
PROJECT DIRECTORY
TENANT/CLIENT:
COMPASS BIBLE CHURCH
CONTACT: BOB DUMONT
2909 DAIMLER STREET
SANTA ANA, CA 92705
TEL: (714) 290 -2593
EMAIL: BOB@COMPASSCHURCH.ORG
OWNER:
DAIMLER COMMERCE PARTNERS, LP
2 TASMAN SEA
NEWPORT COAST, CA 92657
EMAIL: FHUANG39@GMAIL.COM
ARCHITECT/ APPLICANT:
ELEMENTS ARCHITECTURE, INC.
6B LIBERTY, SUITE 100
ALISO VIEJO, CA 92656
CONTACT: SHELLEY MACDONALD
TEL: (714) 917-7244
EMAIL: SMACDONALD@ELEMENTSARCH.COM
PROJECT:COMPASS BIBLE CHURCH -YOUTH ROOM
PROJECT ADDRESS:2909 DAIMLER STREET
SANTA ANA, CA 92705
LEGAL DESCRIPTION:THE LAND REFERRED TO HEREIN BELOW IS
SITUATED IN THE COUNTY OF ORANGE, STATE OF
CALIFORNIA, & IS DESCRIBED AS FOLLOWS:
PARCEL 2, IN THE CITY OF SANTA ANA, COUNTY OF
ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP FILED
IN BOOK 30 PAGE 19 OF PARCEL MAPS, IN THE OFFICE OF
THE COUNTY RECORDER OF ORANGE COUNTY, CALIFORNIA.
EXCEPTIN THEREFROM, ONE-HALF OF ALL OIL, GAS,
MINERALS, HYDROCARBONS & ASSOCIATED SUBSTANCES
LYING BELOW A DEPTH OF 500 FT. FROM THE SURFACE
OF SAID LAND, W/O THE RIGHT OF SURFACE OR
SUBSURFACE ENTRY ABOVE A DEPTH OF 500 FT. FROM
THE SURFACE OF SAID LAND, AS RESERVED IN DEED
RECORDED AUGUST 9, 1968 IN BOOK 8685 PAGE 900
OF OFFICIAL RECORDS OF ORANGE COUNTY.
ACCESSORS PARCEL NO.:430-191-08
FLOOR AREA RATIO:0.39
ZONING DESIGNATION:PROFESSIONAL (P)
LAND USE DESIGNATION:PROFESSIONAL & ADMINISTRATIVE OFFICE (PAO)
LOT NUMBER(S):LOT 116
LOT AREA:122,099 SF = 2.803 AC. (NO PROPOSED CHANGE)
NUMBER OF STORIES:TWO
CONSTRUCTION TYPE:TYPE III-B
OCCUPANCY CLASSIFICATION:ASSEMBLY (A-3), BUSINESS (B), STORAGE (S-2)
*C.B.C. SEC. 508.3 NON-SEPARATED OCCUPANCIES
ALLOWABLE ACTUAL
BUILDING AREA:28,500 SF 23,538 SF
BUILDING HEIGHT:75 FT.+/-22 FT.
NO. OF STORIES:THREE TWO
ZONING:
REQUIRED PROVIDED
MAX. STRUCTURE HEIGHT:+35 FT.+/-22 FT.
SETBACKS:
FRONT:15 FT.54.28 FT.
SIDE (STREET ABUTMENT):15 FT.N/A
SIDE (INT. SIDE PROP. LINES):5 FT.35.00 FT.
REAR (*):50 FT.N/A
REAR:10 FT.44.61 FT.
(*) MAINTAIN SETBACK IF LOT ABUTTING ON REAR PROPERTY LINE IS A PARCEL USED OR ZONED FOR
RESIDENTIAL PURPOSES.
CONSTRUCTION TYPE:III-B, FULLY SPRINKLERED (NFPA 13)
OCCUPANCY CLASSIFICATION: A3, B, S2 (NON-SEPARATED PER CBC 508.3)
EXISTING BUILDING AREAS:
OVERALL BUILDING
GROUND FLOOR
ADJACENT TENANTS (B OCCUPANCY) = 23,888 SF
COMPASS BIBLE CHURCH (A-3 OCCUPANCY) = 19,850 SF
TOTAL 43,738 SF
SECOND FLOOR
COMPASS BIBLE CHURCH (A-3 OCCUPANCY) = 3,688 SF
TOTAL 3,688 SF
TOTAL 47,426 SF
TENANT AREA
GROUND FLOOR
COMPASS BIBLE CHURCH (A-3 OCCUPANCY) = 19,850 SF
SECOND FLOOR
COMPASS BIBLE CHURCH (A-3 OCCUPANCY) = 3,688 SF
TOTAL 23,538 SF
HEIGHT (PER CBC TABLE 504.3):ALLOWABLE ACTUAL
75' *22'-0 (EXISTING)
*USE A OCCUPANCY; MOST RESTRICTIVE
STORIES (PER CBC TABLE 504.4): ALLOWABLE ACTUAL
3*2 (EXISTING)
*USE A-3 OCCUPANCY; MOST RESTRICTIVE
ALLOWABLE AREA (PER CBC TABLE 506.2):ALLOWABLE ACTUAL
35,625 SF**19,850 SF (GROUND)
35,625 SF**3,688 SF (SECOND)
71,250 SF **23,538 SF (TOTAL)
**Aa = (At + (NS X If) X Sa
=(28,500 + (9,500 X 0.75 ) X 2
= 71,250 (35,625 PER FLOOR)
VICINITY MAPKEY SITE PLAN
PLANNING
BUILDING
ABBREVIATIONS:
GENERAL NOTES
1. THE ARCHITECT WILL BE THE INTERPRETER OF THE REQUIREMENTS OF THE CONSTRUCTION
DOCUMENTS & THE JUDGE OF THE PERFORMANCE THERE UNDER BY BOTH THE OWNER & THE
CONTRACTOR.
2. ALL CONSTRUCTION & MATERIALS SHALL BE AS SPECIFIED & AS REQUIRED BY THE CURRENT
EDITION OF THE C.B.C., & LOCAL CODES & AUTHORITIES.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS & SITE CONDITIONS BEFORE STARTING WORK.
SHOULD A DISCREPANCY APPEAR IN THE SPECIFICATIONS OR DRAWINGS OR IN THE WORK DONE BY
OTHERS FROM THE CONSTRUCTION DOCUMENTS THAT AFFECT ANY WORK, NOTIFY THE ARCHITECT
AT ONCE FOR INSTRUCTION ON HOW TO PROCEED. IF THE CONTRACTOR PROCEEDS WITH THE
WORK KNOWING OF AN ERROR, INCONSISTENCY, OR OMISSION IN THE CONTRACT DOCUMENTS
WITHOUT WRITTEN INSTRUCTIONS FROM THE ARCHITECT, THE CONTRACTOR SHALL MAKE GOOD
ANY RESULTING DAMAGE OR DEFECT TO THE SATISFACTION OF THE ARCHITECT.
4. SHOULD A CONFLICT OCCUR IN OR BETWEEN DRAWINGS & SPECIFICATIONS, THE SPECIFICATIONS
SHOULD TAKE PRECEDENCE, UNLESS A WRITTEN DECISION FROM THE ARCHITECT HAS BEEN
OBTAINED WHICH DESCRIBES A CLARIFICATION OR ALTERNATE METHOD &/OR MATERIALS.
5. THE CONTRACTOR SHALL CONFINE THEIR OPERATIONS ON THE SITE TO AREAS PERMITTED BY THE
OWNER. THE WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LAWS, LOCAL ORDINANCES,
PERMITS & THE CONTRACT DOCUMENTS.
6. THE JOB SITE SHALL BE MAINTAINED IN A CLEAN, ORDERLY CONDITION FREE OF DEBRIS & LITTER, &
SHALL NOT BE UNREASONABLY ENCUMBERED WITH ANY MATERIALS OR EQUIPMENT. EACH SUB-
CONTRACTOR IMMEDIATELY UPON COMPLETION OF EACH PHASE OF HIS WORK SHALL REMOVE ALL
TRASH & DEBRIS AS A RESULT OF HIS OPERATIONS.
7. ALL MATERIALS STORED ON THE SITE SHALL BE PROPERLY STACKED & PROTECTED TO PREVENT
DAMAGE & DETERIORATION UNTIL USE. FAILURE TO PROTECT MATERIALS MAY BE CAUSE
REJECTION OF WORK.
8. THE CONTRACTOR SHALL DO ALL CUTTING, FITTING, OR PATCHING OF THEIR WORK THAT MAY BE
REQUIRED TO MAKE ITS SEVERAL PARTS FIT TOGETHER PROPERLY & SHALL NOT ENDANGER ANY
WORK BY CUTTING, EXCAVATING, OR OTHERWISE ALTERING THE WORK OR ANY PART OF IT. ALL
PATCHING, REPAIRING & REPLACING OF MATERIALS & SURFACES, CUT OR DAMAGED IN EXECUTION
OF WORK SHALL BE DONE WITH APPLICABLE MATERIALS SO THAT SURFACES REPLACED WILL, UPON
COMPLETION MATCH SURROUNDING SIMILAR SURFACES.
9. NO PORTION OF THE WORK REQUIRING A SHOP DRAWING OR SAMPLE SUBMISSION SHALL BE
COMMENCED UNTIL THE SUBMISSION HAS BEEN APPROVED BY THE ARCHITECT. ALL SUCH
PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH APPROVED SHOP DRAWINGS & SAMPLES.
10. DIMENSIONS:
A. ALL DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALE.
B. ALL DIMENSIONS TO WOOD STUDS ARE TO FACE OF FRAMING, U.O.N.
C. ALL DIMENSIONS TO METAL STUDS ARE TO CENTER OF FRAMING, U.O.N.
D. CEILING HEIGHT DIMENSIONS ARE FROM THE FINISH FLOOR SLAB TO THE FACE OF CEILING
FINISH MATERIAL UNLESS OTHERWISE NOTED.
11. SAMPLES OF ALL COLORS & MATERIALS SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW &
APPROVAL PRIOR TO ORDERING OF PRODUCTS OR COMMENCING RELATED WORK.
12. SUBSTITUTIONS OF MATERIALS HAVING LIKE QUALITY TO THOSE SPECIFIED OR NOTED WILL BE
CONSIDERED BY THE ARCHITECT. WHERE DESIGN OR DETAIL MODIFICATIONS ARE REQUIRED TO
INCORPORATE THESE SUBSTITUTIONS, THE CONTRACTOR SHALL PROVIDE ALL DRAWINGS & DATA
TO THE ARCHITECT FOR APPROVAL AS REQUESTED TO VERIFY THE QUALITY & CHARACTER OF THE
PRODUCTS & SHOWING THEIR CORRECT INCORPORATION INTO THE PROJECT. THE CONTRACTOR
SHALL NOT MAKE CHANGES WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ARCHITECT.
13. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO ENSURE ALL SUB-CONTRACTORS HAVE
ACCESS TO ALL OF THE VARIOUS DISCIPLINE DRAWINGS TO ACCOMPLISH THE WORK SPECIFIED IN
THE CONTRACT DOCUMENTS.
14. AT LEAST 50% OF CONSTRUCTION WASTE MATERIALS ARE TO BE RECYCLED.
15. PROVIDE ALL NECESSARY BLOCKING, BACKING & FRAMING FOR LIGHT FIXTURES, ELECTRIC UNITS,
A/C EQUIPMENT & ALL OTHER ITEMS AS REQUIRED.
16. PROVIDE ALL ACCESS PANELS AS REQUIRED BY GOVERNING CODE TO ALL CONCEALED SPACES,
VOIDS, ATTICS, ETC. VERIFY TYPE REQUIRED WITH ARCHITECT PRIOR TO INSTALLATION.
17. WHERE LARGER STUDS OR FURRING IS REQUIRED TO COVER PIPING & CONDUITS, THE LARGER
STUD SIZE OR FURRING SHALL EXTEND THE FULL LENGTH OF THE WALL WIDTH & LENGTH WHERE
THE FURRING OCCURS.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FEES & FOR OBTAINING THE PERMITS FOR THE
MECHANICAL, ELECTRICAL & PLUMBING SYSTEMS. THESE SYSTEMS SHALL MEET THE
REQUIREMENTS OF ALL LOCAL CODES & ORDINANCES, & THE REQUIREMENTS OF ALL CURRENT
STATE & FEDERAL CODES.
19. THE CONTRACTOR SHALL PAY FOR THE MAIN ARCHITECTURAL BUILDING PERMIT. THE CONTRACTOR
WILL BE REIMBURSED BY THE OWNER FOR THE COST OF THIS PERMIT. ALL OTHER PERMIT FEES
SHALL BE PAID BY THE GENERAL CONTRACTOR.
20. THE PROJECT CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO MAINTAIN BUILDING
SAFEGUARDS, EXITS & FIRE PROTECTION DEVICES. PROTECT ADJACENT PROPERTIES, WORKERS,
PEDESTRIANS & OTHER PERSONS DURING EXCAVATION & CONSTRUCTION OPERATIONS.
21. THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO SOLID
WASTE, PETROLEUM BYPRODUCTS, SOIL PARTICULATE, CONSTRUCTION WASTE MATERIALS OR
WASTEWATER GENERATED ON CONSTRUCTION SITES OR BY CONSTRUCTION ACTIVITIES SHALL BE
PLACED, CONVEYED OR DISCHARGED INTO THE STREET, GUTTER OR STORM DRAIN SYSTEM.
SYMBOLS LEGEND
DETAIL IDENTIFICATION
BUILDING DETAIL:
SHEET WHERE DETAIL LOCATED
BUILDING SECTION:
SECTION IDENTIFICATION
SHEET WHERE SECTION LOCATED
GRID LINE HEAD
DOOR REFERENCE
KEYNOTE REFERENCE
REVISION
?
0
1
A101
SIM
1ROOM NUMBERRoom name
101
AA-0 FINISH REFERENCE
WALL TYPE REFERENCE
DETAIL REFERENCE:
DETAIL IDENTIFICATION
SHEET WHERE DETAIL LOCATED
1
A101
?
?
1 A101
# POUND OR NUMBER
@ AT
℄CENTERLINE
∠ANGLE
⌀DIAMETER
---------------------------------------------
A.B. ANCHOR BOLTS
A.D. AREA DRAIN
A/C AIR-CONDITIONING
A.C. ASPHALTIC CONCRETE
A.C.T. ACOUSTIC CEILING TILE
ACCESS. ACCESSIBLE
ACOUS. ACOUSTICAL
ADJ. ADJUSTABLE
AGGR. AGGREGATE
ALUM. ALUMINUM
ALT. ALTERNATE
ANOD. ANODIZED
APPROX. APPROXIMATE
ARCH. ARCHITECTURAL
ASPH. ASPHALT
ASS. ASBESTOS
ASSY. ASSEMBLY
---------------------------------------------
B. BASE
B.N. BOUNDARY NAILING
B.O. BOTTOM OF
B.U. BUILT-UP
BD. BOARD
BETW. BETWEEN
BEV. BEVEL
BITUM. BITUMINOUS
BLDG. BUILDING
BLK. BLOCK
BLKG. BLOCKING
BM. BEAM
BOT. BOTTOM
BRG. BEARING
BSMT. BASEMENT
---------------------------------------------
C.B. CATCH BASIN
C.F. CUBIC FOOT
C.G. CORNER GUARD
C.I.P. CAST-IN-PLACE
C.J. CONSTRUCTION JOINT
C.I. CAST IRON
C.M.U. CONCRETE MASONRY UNIT
C.O. CASED OPENING
C.Y. CUBIC YARD
CAB. CABINET
CEM. CEMENT
CER. CERAMIC
CHAM. CHAMFER(ED)
CLG. CEILING
CLKG. CAULKING
CLO. CLOSET
CLR. CLEAR
CNTR. COUNTER
CO. CLEANOUT
COL. COLUMN
CONC. CONCRETE
CONN. CONNECTION
CONSTR. CONSTRUCTION
CONT. CONTINUOUS
CORR. CORRIDOR
CPT. CARPET
CSMT. CASEMENT
CT. CERAMIC TILE
CTR. CENTER
CTSK. COUNTERSUNK
---------------------------------------------
D.F. DRINKING FOUNTAIN
D.H. DOUBLE HUNG
D.L. DEAD LOAD
D.S.P. DRY STANDPIPE
DBL. DOUBLE
DEMO. DEMOLITION
DEP. DEPRESS(ED)
DEPT. DEPARTMENT
DIA. DIAMETER
DIM. DIMENSION
DISP. DISPENSER
DIAG. DIAGONAL
DN. DOWN
DR. DOOR
DS. DOWNSPOUT
DTL. DETAIL
DWG. DRAWING
DWR. DRAWER
---------------------------------------------
E. EAST
E.B. EXPANSION BOLT
E.F. EACH FACE
E.J. EXPANSION JOINT
E.P. ELECTRICAL PANELBOARD
E.W.C. ELECTRICAL WATER COOLER
EA. EACH
ELAST. ELASTOMERIC
ELECT. ELECTRICAL
ELEV. ELEVATION
EMER. EMERGENCY
ENCL. ENCLOSURE
EQ. EQUAL
EQUIP. EQUIPMENT
EQUIV. EQUIVALENT
ESMT. EASEMENT
(E) EXISTING
EXIST. EXISTING
EXP. EXPANSION
EXPO. EXPOSED
EXT. EXTERIOR
---------------------------------------------
F.A. FIRE ALARM
F.D. FLOOR DRAIN
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
F.H. FIRE HYDRANT
F.H.C. FIRE HOSE CABINET
F.N. FIELD NAILING
F.O. FACE OF
F.O.C. FACE OF CONCRETE
F.O.F. FACE OF FINISH
F.O.M. FACE OF MASONRY
F.O.S. FACE OF STUD
FAB. FABRICATE(D)(ION)
FDN. FOUNDATION
(FF) FACTORY FINISH
--------------------------------------------
FGL. FIBERGLASS
FIN. OR F. FINISH
FLASH. FLASHING
FLR. FLOOR
FLUOR. FLUORESCENT
FPRF. FIREPROOF
FT. FOOT OR FEET
FTG. FOOTING
FURN. FURNITURE
FURR. FURRING
FUT. FUTURE
FXTR. FIXTURE
--------------------------------------------
G.B. GRAB BAR
G.C. GENERAL CONTRACTOR
G.I. GALVANIZED IRON
GA. GAUGE
GALV. GALVANIZED
GENL. GENERAL
GL. GLASS
GLB. GLUED LAMINATED BEAM
GND. GROUND
GR. GRADE
GRVL. GRVL.
GT. GROUT
GUT. GUTTER
GYP. GYPSUM
GYP.BD. GYPSUM BOARD
GYP.PLAS. GYPSUM PLASTER
---------------------------------------------
H.B. HOSE BIBB
H.M. HOLLOW METAL
H.V.A.C. HEATING/VENTILATING/AIR-CONDITIONING
H.C. HOLLOW CORE
HDR. HEADER
HDWD. HARDWOOD
HDWR. HARDWARE
HGR. HANGER
HGT. HEIGHT
HORIZ. HORIZONTAL
HP.LAM. HIGH-PRESSURE LAMINATE
HR. HOUR
HTR. HEATER
HYD. HYDRANT
HYDR. HYDRAULIC
---------------------------------------------
I.D. INSIDE DIAMETER (DIM.)
IN. INCHES
INCAN. INCANDESCENT
INCL. INCLUDE(D)(ING)
INFO. INFORMATION
INSP. INSPECT(ING)(ION)
INSTL. INSTALL(ATION)
INSUL. INSULATION
INT. INTERIOR
---------------------------------------------
JAN. JANITOR
JST. JOIST
JT. JOINT
---------------------------------------------
K.D. KILN DRIED
KIT. KITCHEN
---------------------------------------------
L.F. LINEAR FOOT
L.H. LEFT-HAND
L.L. LIVE LOAD
L.V.T. LUXURY VINYL TILE
LAB. LABORATORY
LAM. LAMINATE
LAV. LAVATORY
LB. POUND
LBS. POUNDS
LDGR. LEDGER
LIN. LINEAR
LKR. LOCKER
LOC. LOCATION
LT. LIGHT
LT.WT. LIGHT-WEIGHT
LTG. LIGHTING
--------------------------------------------
M.B. MACHINE BOLT
M.C. MEDICINE CABINET
MAS. MASONRY
MATL. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MED. MEDIUM
MEMB. MEMBRANE
MEZZ. MEZZANINE
MFR. MANUFACTURER
MH. MANHOLE
MIN. MINIMUM
MIR. MIRROR
MISC. MISCELLANEOUS
MLWK. MILLWORK
MTD. MOUNTED
MTG. MOUNTING
MTL. METAL
MTR. MORTAR
MUL. MULLION
--------------------------------------------
(N) NEW
N. NORTH
N.A. NOT APPLICABLE
N.I.C. NOT IN CONTRACT
N.T.S. NOT TO SCALE
NO. NUMBER
NOM. NOMINAL
--------------------------------------------
O.A. OVERALL
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O/ OVER
OBS. OBSCURE
OCC. OCCUPANTS
OFC. OFFICE
OPNG. OPENING
OPP. OPPOSITE
OVHD. OVERHEAD
---------------------------------------------
P.LAM. PLASTIC LAMINATE
P.G. PAINT GRADE
P.T. PRESSURE TREATED
PAR. PARALLEL
PARTN. PARTITION
PCF. POUNDS PER CUBIC FOOT
PEMB. PRE-ENGINEERED METAL BUILDING
PERF. PERFORATE
PERP. PERPENDICULAR
PLAS. PLASTIC
PLUMB. PLUMBING
PLF. POUNDS PER LINEAL FOOT
PLYWD. PLYWOOD
PNL. PANEL
PNT. PAINT
PR. PAIR
PRCST. PRECAST
PREFAB. PREFABRICATE(D)
PREFIN. PREFINISH(ED)
PROP. PROPERTY
PSI. POUNDS PER SQUARE INCH
PT. POINT
PTN. PARTITION
PVC. POLYVINYLCHLORIDE
PVMT. PAVEMENT
-------------------------------------------
Q.T. QUARRY TILE
QTY. QUANTITY
QUAL. QUALITY
---------------------------------------------
R. RISER
R.D. ROOF DRAIN
R.H. RIGHT-HAND
R.O. ROUGH OPENING
R.W.L. RAIN WATER LEADER
RAD. RADIUS
RBR. RUBBER
REC. RECESSED
REF. REFERENCE
REFR. REFRIGERATOR
REINF. REINFORCE(D)
REQ. REQUIRED
RESIL. RESILIENT
REV. REVISE OR REVISION
RFG. ROOFING
RGTR. REGISTER
RLG. RAILING
RM. ROOM
RND. ROUND
---------------------------------------------
S. SOUTH
S.C. SOLID CORE
S.C.W. SOLID CORE WOOD
S.S. STAINLESS STEEL
S.SK. SERVICE SINK
SCHED. SCHEDULE
SECT. SECTION
SH. SHELF
SHR. SHOWER
SHT. SHEET
SIM. SIMILAR
SPEC. SPECIFICATION
SQ. SQUARE
ST. STAIN
STA. STATION
STAG. STAGGER(ED)
STD. STANDARD
STL. STEEL
STOR. STORAGE
STRUCT. STRUCTURAL
SUSP. SUSPENDED
SYM. SYMMETRICAL
SYS. SYSTEM
---------------------------------------------
T&B TOP & BOTTOM
T&G TONGUE & GROOVE
T. TEMPERED
T.O. TOP OF
T.O.C. TOP OF CURB
T.O.P. TOP OF PARAPET
T.O.PL. TOP OF PLATE
T.O.R. TOP OF ROOF
T.O.S. TOP OF SLAB
T.P. TOP OF PAVEMENT
T.S. TUBE STEEL
T.V. TELEVISION
T.W. TOP OF WALL
TEL. TELEPHONE
TEMP. TEMPORARY
TER. TERRAZZO
THK. THICK
THRD. THREAD(ED)
THRES. THRESHOLD
TI. TILE
TR. TREAD
TYP. TYPICAL
---------------------------------------------
U.O.N. UNLESS OTHERWISE NOTED
UNF. UNFINISHED
UR. URINAL
UTIL. UTILITY
---------------------------------------------
V. VINYL
V.C.T. VINYL COMPOSITION TILE
V.I.F. VERIFY IN FIELD
V.P. VINYL PLANK
V.S. VINYL SHEET
VERT. VERTICAL
VEST. VESTIBULE
VNR. VENEER
-------------------------------------------
W/ WITH
W/O WITHOUT
W. WEST
W.C. WATER CLOSET
W.GL. WIRE GLASS
W.I. WROUGHT IRON
W.V. WOOD VENEER
W.W.F. WELDED WIRE FABRIC
WD. WOOD
WDW. WINDOW
WF. WIDE FLANGE
W.P. WATERPROOF(ING)
WSCT. WAINSCOT
WT. WEIGHT
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
F
APPLICABLE CODES & STANDARDS
2025 CALIFORNIA BUILDING CODE (CBC), PART 2, CBSC
2025 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, CBSC
2025 CALIFORNIA MECHANICAL CODE (CMC), PART 4, CBSC
2025 CALIFORNIA PLUMBING CODE (CPC), PART 5, CBSC
2025 CALIFORNIA ENERGY CODE, PART 6, CBSC
2025 CALIFORNIA FIRE CODE (CFC)
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
2025 BUILDING ENERGY EFFICIENCY STANDARDS CODE
SANTA ANA MUNICIPAL CODE (SAMC)
LIST OF FEDERAL CODES & STANDARDS
AMERICANS WITH DISABILITIES ACT (ADA), TITLE II OR TITLE III
FOR TITLE II: UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS)
OR ADA STANDARDS FOR ACCESSIBLE DESIGN (APPENDIX A OF 28 CFR PART 36)
FOR TITLE III: ADA STANDARDS FOR ACCESSIBLE DESIGN (APPENDIX A OF 28 CFR PAR 36)
DEFERRED SUBMITTALS
THIS PROJECT HAS BEEN PERMITTED WITHOUT REVIEW &/OR APPROVAL OF THE FOLLOWING
DEFERRED SUBMITTALS. PLANS APPROVED BY THE CITY SHALL BE OBTAINED FOR EACH DEFERRED
ITEM LISTED BELOW PRIOR TO COMMENCING ANY WORK W/IN THE SCOPE OF SUCH DEFERRAL.
DEFERRALS MUST BE REVIEWED & ACCEPTED BY THE ARCHITECT OR ENGINEER OF RECORD PRIOR TO
SUBMITTING FOR REVIEW W/ THE CITY:
1. MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM (IF / AS REQUIRED)
2. MODIFICATIONS TO EXISTING FIRE SPRINKLER SYSTEM (IF / AS REQUIRED)
FULLY "BUILT-OUT" APPROVED PLAN PER CONDITIONAL USE PERMIT NO. 2022-13
EXISTING / CURRENT PLAN, AS PERMITTED & CONSTRUCTED UNDER #101109480 & 101122238
PROPOSED SCOPE OF WORK UNDER THIS PERMIT
YOUTH
ADJACENT TENANT (NOT IN SCOPE)
NURSERY
STRUCTURAL ENGINEER:
CORE STRUCTURE
201 E. SANDPOINTE AVENUE, SUITE 400
SANTA ANA, CA 92707
CONTACT: AMIR DEIHIMI
TEL: (949) 954 - 7242
EMAIL: AMIR@CORESTRUCTURE.COM
MECHANICAL / ELECTRICAL:
MEP ENERGY SOLUTIONS GROUP, INC.
79705 STAR FLOWER TRAIL
LA QUINTA, CA 92253
CONTACT: BENNETT HEALY
TEL: (562) 439 - 2935
EMAIL: BHEALY@MEPESG.COM
A
AREA & OCCUPANCY TABULATIONS
SCOPE OF WORK (REFERENCE PLAN DIAGRAMS BELOW):
1. CONVERT EXISTING STORAGE TO YOUTH ROOM ASSEMBLY ROOM AND HALLWAY:
• -2,0001 SF STORAGE (S2)
• +1,557 SF YOUTH ROOM (A3)
• +444 SF HALLWAY
2. CONVERT EXISTING HALLWAY / VACANT SPACE TO NURSERY (AND CONVERT EXISTING
NURSERY TO STORAGE AT ROOM #107):
• +452 SF NURSERY (A3)
• +279 SF STORAGE (S2)
• -731 SF HALLWAY
PROPOSED TOTAL BUILDING AREA & OCCUPANT LOAD:
AREA OCCUPANT LOAD
OCCUPANCY TYPE
A3 11,699 SF 1584.6
B 3,868 SF 25.8
S2 1,179 SF 3.9
UTILITY / MISC 6,792 SF 0
TOTAL 23,538 SF 1,615
(SEE SHEET A0.2 FOR FULL OCCUPANT LOAD SCHEDULE & EGRESS PLAN)
E DYER RD.
W MACARTHUR BLVD.
E DYER RD.
E WARNER AVE.
E DEER AVE.DAIMLER ST.
PROJECT LOCATION
2915
2909
23,538 SF
2-STORY
A-3 OCCUPANCY
COMPASS CHURCH
11,944 SF
1-STORY
B OCCUPANCY
WATER TECHNIQUES
2917
11,944 SF
1-STORY
B OCCUPANCY
PRIMEGEN BIOTECH
EXISTING 3-HOUR FIRE WALL
DAIMLER STREET
AL
T
O
N
A
V
E
N
U
E
3009 3001 2921
2915-2917
29012909
PCM IRVINE
CHEERLEADING
WATER TECHNIQUES,
PRIMEGEN BIOTECHREGAL
TECHNOLOGY
PARTNERS
NKMAX
BIOTECH
HGST "A WESTERN
DIGITAL CO."
NORTH
A1.1
1
AREA OF WORK
COMPASS
BIBLE
CHURCH
PROJECT
NORTH
TRUE
NORTH
(E) STAIR
ADJACENT TENANT (NOT IN SCOPE)
EXISTING AREA TO REMAIN
YOUTH
STORAGE
NURSERY
NURSERY
LUNCH ROOM
OFFICE
STORAGE
NOTE -NURSERIES WILL BE UTILIZED BY MOMS WITH YOUNG
CRYING OR DISRUPTIVE CHILDREN DURING CHURCH SERVICES
ONLY. NO CHILDCARE OR DAYCARE SERVICES ARE PROPOSED BY
COMPASS BIBLE CHURCH, CURRENTLY OR IN THE FUTURE.
A
-2,0001 SF STORAGE (S2)
+1,557 SF YOUTH ROOM (A3)
+444 SF HALLWAY
HALLWAY
+731 SF NURSERY (A3)
-279 SF NURSERY (A3)
+ 452 NURSERY (A3) NET
+279 SF STORAGE (S2)
-731 SF HALLWAY
279 SF
1,557 SF444 SF
731 SF
(E) STAIR
ADJACENT TENANT (NOT IN SCOPE)
STORAGE
NURSERY
LUNCH ROOM
STORAGE
YOUTH
OFFICE
279 SF
2,0001 SF
HALLWAY
731 SF
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
3
3
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A0.1
GENERAL
INFORMATION
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
SHEET INDEX
ARCHITECTURAL
A0.1 GENERAL INFORMATION
A0.2 CODE ANALYSIS & EGRESS PLAN
A1.1 EXISTING SITE PLAN (FOR REFERENCE ONLY)
A2.1 DEMOLITION GROUND FLOOR PLAN
A2.2 PROPOSED GROUND FLOOR PLAN
A2.3 EXISTING SECOND FLOOR PLAN (FOR REFERENCE ONLY)
A2.4 ROOF PLAN
A4.1 DEMOLITION GROUND FLOOR REFLECTED CEILING PLAN
A4.2 PROPOSED GROUND FLOOR REFLECTED CEILING PLAN
A5.1 ELEVATIONS & SECTIONS
A8.1 DETAILS
A9.1 DOOR, WALL & FINISH SCHEDULES
A9.2 SPECIFICATIONS
A9.3 SPECIFICATIONS
ELECTRICAL
E0.1 LEGEND, SCHED., GENERAL NOTES & ABBREVIATIONS
E0.2 DETAILS & SCHEDULES
E0.3 LIGHTING CONTROL DETAILS
E2.1 ELECTRICAL FIRST FLOOR LIGHTING PLAN
E3.1 ELECTRICAL FIRST FLOOR POWER PLAN
E3.3 ELECTRICAL ROOF PLAN
E4.1 SINGLE LINE DIAGRAM & PANEL SCHEDULES
E5.1 ELECTRICAL SPECIFICATIONS
E6.1 TITLE 24 CALCULATIONS
MECHANICAL
M0.1 LEGEND, SCHED., GENERAL NOTES & ABBREVIATIONS
M0.2 MECHANICAL DETAILS
M2.0 MECHANICAL DEMO FIRST FLOOR PLAN
M2.1 MECHANICAL FIRST FLOOR PLAN
M3.1 MECHANICAL ROOF PLAN
M4.1 MECHANICAL SPECIFICATIONS
M5.1 MECHANICAL TITLE 24 COMPLIANCE
(UNDER SEPARATE PERMIT)
(UNDER SEPARATE PERMIT)
STRUCTURAL
S-0.10 GENERAL NOTES & REQUIREMENTS
S-0.11 GENERAL NOTES & REQUIREMENTS
S-0.20 TYPICAL COLD FORM DETAILS
S-1.0 FOUNDATION AND FRAMING PLAN
SD1.0 STRUCTURAL DETAILS
A PLAN CHECK CORRECTION 04-08-26
A
WH
FD
FD
UP UP
UP
UP
UP
FIRE & LIFE SAFETY LEGEND
EXIT SIGN -
CEILING / WALL MOUNTED
DIRECTIONAL EXIT SIGN -
CEILING / WALL MOUNTED
1. PROVIDE FIRE EXTINGUISHERS AS SHOWN IN PLANS (MINIMUM) - FINAL LOCATIONS
TO BE DETERMINED BY FIRE DEPARTMENT INSPECTOR.
2. EXITS, EXIT ACCESS DOORS AND PATHS OF EGRESS TRAVEL THAT IS NOT
IMMEDIATELY VISIBLE TO THE OCCUPANTS SHALL BE MARKED BY AN APPROVED
EXIT SIGN THAT IS READILY VISIBLE FROM ANY DIRECTION OF EGRESS TRAVEL.
EXIT SIGNS SHALLL BE INTERNALLY OR EXTERNALLY ILLUMINATED. (NOTE:
ADDITIONAL EXITS SIGNS MAY BE REQUIRED AT TIME OF FIELD INSPECTION.)
3. EXIT ACCESS SHALL NOT PASS THROUGH A ROOM WHICH CAN BE LOCKED TO
PREVENT EGRESS
4. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED. (CBC 1013.3).
5. ELECTRICALLY POWERED EXIT SIGNS SHALL BE LISTED AND LABELED IN
ACCORDANCE WITH UL 924. (CBC SECTION 1013.5.)
6. EMERGENCY POWER SUPPLY TO ILLUMINATE EXIT SIGNS FOR A DURATION OF NOT
LESS THAN 90 MINUTES.
7. IN THE EVENT OF A POWER SUPPLY FAILURE, AN EMERGENCY ELECTRICAL
SYSTEM SHALL AUTOMATICALLY ILLUMINATE AISLES, LOBBY, CORRIDOR AND
EXTERIOR DOOR LANDING. THE EMERGENCY POWER SYSTEM SHALL PROVIDE
POWER FOR A DURATION OF NOT LESS THAN 90 MINUTES AND SHALL CONSIST OF
STORAGE BATTERIES, UNIT EQUIPMENT OR AN ON-SITE GENERATOR. INITIAL
ILLUMINATION AVERAGE OF 1 FOOT-CANDLE AND A MINIMUM 0.1 FOOT-CANDLE AT
FLOOR LEVEL (CBC 1008.3.4).
8. ALL TACTILE SIGNAGE SHALL BE MOUNTED AT LATCH SIDE OF DOOR.
TACTILE EXIT / EXIT ROUTE SIGN, SEE
NUMBER OF OCCUPANTS EXITING SPACE
.... .EXIT
EXISTING WALL-MOUNTED FIRE-EXTINGUISHER,
RATED 2-A/10B/C
10
INDICATES PANIC HARDWARE AT DOORPANIC
FE
MAX OCCUPANCY SIGN, SEE OCC
ASSISTIVE LISTENING SYSTEM SIGN, SEE ALS
ASSISTIVE LISTENING SYSTEM NOTES
1. PROVIDE ASSISTIVE LISTENING SYSTEM AT ASSEMBLY AREAS, CONFERENCE AND MEETING
ROOMS IN ACCORDANCE WITH CBC SECTION 11B-219 AND 11B-706
2. TOTAL NUMBER OF RECEIVERS SHALL BE EQUAL TO 4% TOTAL NUMBER OF SEATS, BUT NO
LESS THAN 2
3. 25% OF MINIMUM RECEIVERS PROVIDED, BUT NO LESS THAN TWO, SHALL BE HEARING-AID
COMPATIBLE PER 11B-219.3
4. AREAS WITH SYSTEM SHALL BE WITHIN 50' VIEWING DISTANCE OF STAGE OR PLAYING AREA
AND HAVE COMPLETE VIEW OF STAGE OR PLAYING AREA, WHERE APPLICABLE.
5. RECEIVERS REQUIRED FOR USE WITH AN ASSISTIVE LISTENING SYSTEM SHALL INCLUDE 1/8"
STANDARD MONO JACK
6. RECEIVERS REQUIRED TO BE HEARING-AID COMPATIBLE SHALL INTERFACE WITH TELECOILS
IN HEARING AIDS THROUGH THE PROVISION OF NECKLOOPS
7. ASSISTIVE LISTENING SYSTEMS SHALL BE CAPABLE OR PROVIDING A SOUND PRESSURE
LEVEL OF 110 dB MINIMUM AND 118 dB MAXIMUM WITH A DYNAMIC RANGE ON THE VOLUME
CONTROL OF 50 dB.
8. THE SIGNAL-TO-NOISE RATIO FOR INTERNALLY GENERATED NOISE IN ASSISTIVE LISTENING
SYSTEMS SHALL BE 18dB MINIMUM
9. PEAK CLIPPING SHALL NOT EXCEED 18 dB OF CLIPPING RELATIVE TO PEAKS OF SPEECH
FIRE & LIFE SAFETY NOTES
49.5FT.TRAVEL DISTANCE TO EXIT
THIS PROJECT CONSISTS OF AN EXISTING ONE-STORY CONCRETE AND WOOD FRAMED STRUCTURE.
BUILDING IS SEPARATED FROM ADJACENT BUILDING BY EXISTING 3-HOUR FIRE WALL -SEE DIAGRAM
BELOW.
THE TENANT SPACE IS EQUIPPED WITH AN EXISTING NFPA 13 AUTOMATIC FIRE SPRINKLER SYSTEM
THROUGHOUT.
CONSTRUCTION TYPE:III-B, FULLY SPRINKLERED (NFPA 13)
OCCUPANCY CLASSIFICATION: A3, B, S2 (NON-SEPARATED PER CBC 508.3)
BUILDING AREA:
TENANT AREA OF WORK
GROUND FLOOR = 19,850 SF
SECOND FLOOR = 3,688 SF
TOTAL 23,538 SF
HEIGHT (PER CBC TABLE 504.3):ALLOWABLE ACTUAL
75' *22'-0 (EXISTING)
*USE A OCCUPANCY; MOST RESTRICTIVE
STORIES (PER CBC TABLE 504.4): ALLOWABLE ACTUAL
3*2 (EXISTING)
*USE A-3 OCCUPANCY; MOST RESTRICTIVE
ALLOWABLE AREA (PER CBC TABLE 506.2):ALLOWABLE ACTUAL
35,625 SF**19,850 SF (GROUND)
35,625 SF**3,688 SF (SECOND)
71,250 SF **23,538 SF (TOTAL)
**Aa = (At + (NS X If) X Sa
=(28,500 + (9,500 X 0.75 ) X 2
= 71,250 (35,625 PER FLOOR)
EXISTING BUILDING CODE ANALYSIS
A
(E)
OFFICE
205 (E)
OFFICE
206
(E)
OFFICE
204
(E)
OFFICE
203
(E)
OFFICE
202
(E)
HALLWAY
201
(E) STOR.
207
3
2
4
3
2
9
24
.... .EXIT
1
VOID
2915 2909
23,538 SF
2-STORY
A-3 OCCUPANCY
(AREA OF WORK)
COMPASS CHURCH
11,944 SF
1-STORY
B OCCUPANCY
WATER TECHNIQUES
2917
11,944 SF
1-STORY
B OCCUPANCY
PRIMEGEN BIOTECH
EXISTING 3-HOUR FIRE WALL
(E) STAIR
ADJACENT TENANT (NOT IN SCOPE)(E) 3-HOUR FIRE WALL(E) 3-HOUR FIRE WALL
NOTES:
• SEE SITE PLAN FOR ASSUMED PROPERTY LINE INFORMATION
• EXISTING EXTERIOR WALLS ARE 8" THICK CONCRETE TILT-UP, WHICH HAVE A FIRE-RESISTANCE RATING OF 4 HOURS PER CBC TABLE 721(2)
• FIRE WALL EXTENDS 18" PAST EXTERIOR SURFACE OF EXTERIOR WALL PER CBC 706.5 (EAST SIDE)
• FIRE WALL PERMITTED TO TERMINATE AT INTERIOR SURFACE OF EXTERIOR WALL (WEST SIDE), PROVIDED EXTERIOR WALL HAS A 1-HOUR MIN. FIRE-
RESISTANCE RATING FOR A HORIZONTAL DISTANCE OF NOT LESS THAN 4 FEET, WITH NO OPENINGS -PER CBC 706.5 EXCEPTION 1
• FIRE-RESISTANCE RATING OF ADJACENT EXTERIOR WALLS IS 1-HOUR MIN.; WITH NO OPENINGS, FOR A MINIMUM OF 4 FEET FROM THE INTERSECTION
OF THE FIRE WALL TO EXTERIOR WALL (AS REQUIRED BY CBC 706.5.1 #1)
(E) STAIR
41
23
16
19
18
1
3
2
18
18
2
20
606
223
2
86
87
367
88
173 173
336 166 336
EXIT WIDTH RQ'D = 336 X 0.2 = 67.2"
EXIT WIDTH PROVIDED = 72"
EXIT WIDTH RQ'D = 166 X 0.2 = 33.2"
EXIT WIDTH PROVIDED = 36"
337
167
EXIT WIDTH RQ'D = 167 X 0.2 = 33.4"
EXIT WIDTH PROVIDED = 36"
EXIT WIDTH RQ'D = 337 X 0.2 =67.4"
EXIT WIDTH PROVIDED = 72"
24
NOTE: DESIGN PROPOSES MULTIPLE EXITS WITH NO SINGLE WELL-DEFINED “MAIN EXIT”.
THEREFORE, EXITS HAVE BEEN DISTRIBUTED AROUND THE PERIMETER OF THE BUILDING AS
SHOWN, TO MEET REQUIREMENTS PER CBC 1029.2.
FE
FE
FE
FE
PANIC
PANIC
PANIC PANIC PANIC
PANIC PANIC
PANIC
EXISTING 3-HOUR FIRE WALL
OVERALL BUILDING DIAGONAL = 216'-0"
OVERALL BUILDING EXIT SEPARATION = 121'-10" > 1/3 (216'-0")
AUDITORIUM DIAGONAL = 82'-8"
AUDITORIUM EXIT SEPARATION = 51'-8" > 1/3 (82'-8")
PANIC
174
173
OVERALL DIAGONAL = 60'-0"
EXIT SEPARATION =
32'-11" > 1/3 (60'-0")
EXIT WIDTH RQ'D = 112 X 0.2 = 22.4"
EXIT WIDTH PROVIDED = 72"
PANIC
PANIC
.... .EXIT
(E)
.... .EXIT
OCC
ALS
(E)
(E)
LOBBY
101
(E)
HALLWAY
102
(E)
MEETING
ROOM
103
(E)
MEETING
ROOM
104
(E)
MEETING
ROOM
105
(E)
MEETING
ROOM
106
STORAGE
107
(E) VOID
108
(E)
OFFICE
109
(E) I.T.
ROOM
110
(E)
MEETING
ROOM
111
(E)
LUNCH
ROOM
112
(E)
MEETING
ROOM
113
(E) JAN
114
(E) RR
115
(E) RR
116
NURSERY
117
NURSERY
118
(E)
LOBBY
119
(E)
AUDITORIUM
120
(E)
STORAGE
121
(E)
STORAGE
122
YOUTH
124
STORAGE
125
(E)
YOUTH
126
(E) F.R.
104A
(E)
ELECT
127
32
18
1
OCC
ALS
(N)
(N)
.... .EXIT(N)
112
111
.... .EXIT(N)
1
PANIC(N)
PANIC
1
1
HALLWAY
123
.... .EXIT(N)
FE
59FT.
MAX COMMON
PATH OF TRAVEL
(< 75')
.... .EXIT
(N)
(N)
A
20
A8.1
19
A8.1
17
A8.1
18
A8.1
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
3
6
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A0.2
CODE ANALYSIS &
EGRESS PLAN
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
BUILDING OCCUPANT LOAD CALCULATIONS AND EGRESS SCHEDULE - GROUND FLOOR
ROOM OCCUPANT LOAD (PER TABLE 1004.1.2) EXITING
NO. NAME SQ. FT. OCCUPANCY FUNCTION OF SPACE
OCCUPANT LOAD
FACTOR
NO. OF
OCCUPANTS
ONE EXIT - MAX
OCCUPANT LOAD PER
OCCUPANCY
MIN. NO. OF
EXITS
MINIMUM EXITING DOOR WIDTH
(IN INCHES)
PROVIDED EXITING DOOR WIDTH (IN
INCHES)
101 (E) LOBBY 202 SF A3 Assembly (Concentrated) 5 40.4 49 1 8.1 288
102 (E) HALLWAY 3,000 SF -- (none) 0
103 (E) MEETING ROOM 333 SF A3 Assembly (Unconcentrated) 15 22.2 49 1 4.4 36
104 (E) MEETING ROOM 237 SF A3 Assembly (Unconcentrated) 15 15.8 49 1 3.2 36
104A (E) F.R. 11 SF -- (none)
105 (E) MEETING ROOM 273 SF A3 Assembly (Unconcentrated) 15 18.2 49 1 3.6 36
106 (E) MEETING ROOM 260 SF A3 Assembly (Unconcentrated) 15 17.3 49 1 3.5 36
107 STORAGE 279 SF S2 Storage and Stock Rooms 300 0.9 29 1 0.2 36
108 (E) VOID 111 SF -- (none)
109 (E) OFFICE 384 SF B Offices 150 2.6 49 1 0.5 36
110 (E) I.T. ROOM 273 SF B Business Areas 150 1.8 49 1 0.4 36
111 (E) MEETING ROOM 536 SF A3 Assembly (Unconcentrated) 15 35.7 49 1 7.1 36
112 (E) LUNCH ROOM 193 SF B Business Areas 150 1.3 49 1 0.3 36
113 (E) MEETING ROOM 294 SF A3 Assembly (Unconcentrated) 15 19.6 49 1 3.9 36
114 (E) JAN 20 SF -- (none)
115 (E) RR 329 SF -- (none)
116 (E) RR 392 SF -- (none)
117 NURSERY 472 SF A3 Assembly (Unconcentrated) 15 31.4 49 1 6.3 36
118 NURSERY 259 SF A3 Assembly (Unconcentrated) 15 17.3 49 1 3.5 36
119 (E) LOBBY 1,832 SF A3 Assembly (Concentrated) 5 366.5 49 2 73.3 288
120 (E) AUDITORIUM 4,238 SF A3 Assembly (Concentrated) 7 605.5 49 3 121.1 252
121 (E) STORAGE 324 SF S2 Storage and Stock Rooms 300 1.1 29 1 0.2 36
122 (E) STORAGE 261 SF S2 Storage and Stock Rooms 300 0.9 29 1 0.2 36
123 HALLWAY 444 SF -- (none) 0
124 YOUTH 1,557 SF A3 Assembly (Concentrated) 7 222.4 49 2 44.5 144
125 STORAGE 224 SF S2 Storage and Stock Rooms 300 0.7 29 1 0.1 72
126 (E) YOUTH 1,206 SF A3 Assembly (Concentrated) 7 172.3 49 2 34.5 144
127 (E) ELECT 113 SF -- (none)
18,057 SF 1593.9
PLUMBING FIXTURE ANALYSIS
TOTAL "A-3" OCCUPANTS = 11,699 SF/30 = 390 OCCUPANTS
= 195 MEN, 195 WOMEN
WATER CLOSETS URINALS LAVATORIES DF
WO
M
E
N
ME
N
3
6*
3 2
3
WATER CLOSETS URINALS LAVATORIES DF
WO
M
E
N
M
E
N
5
9
4 4
6
TO
T
A
L
R
E
Q
'
D
TO
T
A
L
P
R
O
V
I
D
E
D
WATER CLOSETS URINALS LAVATORIES DF
WO
M
E
N
M
E
N
1
1
1 1
1
WATER CLOSETS URINALS LAVATORIES DF
WO
M
E
N
M
E
N
2
4
2 1
2
TOTAL "B" OCCUPANTS =3,868 SF / 150 = 26 OCCUPANTS
= 13 MEN, 13 WOMEN
* TOTAL # REQ'D FOR WOMEN SHALL NOT BE LESS THAN TOTAL
# WATER CLOSETS + URINALS REQ'D FOR MEN
1/8" = 1'-0"2SECOND FLOOR CODE ANALYSIS PLAN
TRUE
NORTH
PROJECT
NORTH
BUILDING OCCUPANT LOAD CALCULATIONS AND EGRESS SCHEDULE - SECOND FLOOR
ROOM OCCUPANT LOAD (PER TABLE 1004.1.2) EXITING
NO. NAME SQ. FT. OCCUPANCY FUNCTION OF SPACE
OCCUPANT LOAD
FACTOR
NO. OF
OCCUPANTS
ONE EXIT - MAX
OCCUPANT LOAD PER
OCCUPANCY
MIN. NO. OF
EXITS
MINIMUM EXITING DOOR WIDTH
(IN INCHES)
PROVIDED EXITING DOOR WIDTH (IN
INCHES)
201 (E) HALLWAY 1,302 SF B Offices 150 8.7 49 1 1.7 36
202 (E) OFFICE 351 SF B Offices 150 2.3 49 1 0.5 60
203 (E) OFFICE 302 SF B Offices 150 2.0 49 1 0.4 36
204 (E) OFFICE 492 SF B Offices 150 3.3 49 1 0.7 72
205 (E) OFFICE 375 SF B Offices 150 2.5 49 1 0.5 36
206 (E) OFFICE 196 SF B Offices 150 1.3 49 1 0.3 36
207 (E) STOR. 91 SF S2 Storage and Stock Rooms 300 0.3 49 1 0.1 36
3,109 SF 20.4
Circulation Serving A3 (NET)
19,850 SF
3,688 SF
1
1
2
2 + BF
1/8" = 1'-0"1FIRST FLOOR CODE ANALYSIS PLAN
Circulation Serving A3 (NET)
A PLAN CHECK CORRECTION 04-08-26
A
A
A
A
CL D A I M L E R S T R E E T
2909
COMPASS BIBLE CHURCH
(E
)
T
R
A
S
H
ADA ADA VAN ADA ADA
AD
A
30
0
'
-
0
"
P
.
L
.
30
0
'
-
0
"
P
.
L
.
407'-0" P.L.
407' - 0" P.L.
NORTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 23 24 25 26 27 28 29 30 31 32 33 34 35
36 37 38 39 40 41 45 46 47
49 50 52 54 56 58
170
61 62
63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
81 83 84 85 87 88 89 91 92 93 95 96 97
51 53 55 57 59 60
82 86 90 94
42 43
44 48
99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120
123
124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139
140
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
141
171
172
173
174
175
176
177
178
179
180
98
21 22
ADA VAN ADA
121
122
ADA VANADA
R 42' - 0"
R 30' - 0"
R 42' - 0"R 30' - 0"
ADJACENT TENANT-
NOT A PART
(EXISTING)
54' - 5"
EXISTING STAGING AREA
ADJACENT TENANT-
NOT A PART
29152917
4' - 0"
200
AS
S
U
M
E
D
P
R
O
P
E
R
T
Y
L
I
N
E
20' - 0"
20' - 0"
EXISTING MAXIMUM AREA OF EXTERIOR
WALL OPENINGS = NO LIMIT (UNPROTECTED,
SPRINKLERED, 20' FIRE SEPARATION
DISTANCE) PER CBC TABLE 705.8
EXISTING (3-HOUR MIN. FIRE-RATED)
CONCRETE TILT-UP WALL; NO
OPENINGS
EXISTING MAXIMUM AREA OF EXTERIOR
WALL OPENINGS = NO LIMIT
(UNPROTECTED, SPRINKLERED, 20' FIRE
SEPARATION DISTANCE) PER CBC
TABLE 705.8
EV EV
EXISTING ACCESSIBLE PARKING AND PATH OF
TRAVEL TO BUILDING ENTRY
EXISTING ACCESSIBLE PARKING AND PATH OF
TRAVEL TO BUILDING ENTRY
EXISTING ACCESSIBLE PARKING AND PATH OF
TRAVEL TO BUILDING ENTRY
AREA OF WORK
EXISTING PARKING TABULATIONS
ADDRESS USE AREA RATIO RE'D PARKING
2909 DAIMLER CHURCH (AUDITORIUM)* 4,180 SF 1 SPACE PER 50 SF 84 SPACES
CHURCH (H.S. YOUTH)* 767 SF**1 SPACE PER 50 SF 15 SPACES
2915 DAIMLER OFFICE 11,944 SF 1 SPACE PER 1,000 SF 36 SPACES
2917 DAIMLER OFFICE 11,944 SF 1 SPACE PER 1,000 SF 36 SPACES
TOTAL PARKING SPACES REQUIRED 171 SPACES
TOTAL PARKING SPACES PROVIDED 200 SPACES
STANDARD = 191
ACCESSIBLE = 9
(6 STANDARD + 3 VAN)
NOTES:
* SEATING AREAS WITHOUT FIXED SEATS. "SEATING AREAS" SHALL INCLUDE CONGREGATION SEATING,
PRAYER AND CRY ROOMS, PASTOR AND CHOIR AREAS, AND SIMILAR AREAS
** 1/2 THE TOTAL AREA OF THE HIGH SCHOOL YOUTH ROOM WAS USED FOR THIS CALCULATION SINCE
ROUGHLY 1/2 OF HIGH SCHOOLERS ARE ELIGIBLE TO OBTAIN A DRIVER'S LICENSE. ON AVERAGE THE
ACTUAL NUMBER OF LICENSED HIGH SCHOOLERS IS MUCH LESS THAN 1/2
EXISTING PLANNING / ZONING TABULATIONS
PROJECT:COMPASS BIBLE CHURCH
PROJECT ADDRESS:2909 DAIMLER STREET
SANTA ANA, CA 92705
LEGAL DESCRIPTION:THE LAND REFERRED TO HEREIN BELOW IS
SITUATED IN THE COUNTY OF ORANGE, STATE
OF CALIFORNIA, & IS DESCRIBED AS FOLLOWS:
PARCEL 2, IN THE CITY OF SANTA ANA, COUNTY
OF ORANGE, STATE OF CALIFORNIA, AS
SHOWN ON A MAP FILED IN BOOK 30 PAGE 19
OF PARCEL MAPS, IN THE OFFICE OF THE
COUNTY RECORDER OF ORANGE COUNTY,
CALIFORNIA. EXCEPTIN THEREFROM, ONE-
HALF OF ALL OIL, GAS, MINERALS,
HYDROCARBONS & ASSOCIATED SUBSTANCES
LYING BELOW A DEPTH OF 500 FT. FROM THE
SURFACE OF SAID LAND, W/O THE RIGHT OF
SURFACE OR SUBSURFACE ENTRY ABOVE A
DEPTH OF 500 FT. FROM THE SURFACE OF SAID
LAND, AS RESERVED IN DEED RECORDED
AUGUST 9, 1968 IN BOOK 8685 PAGE 900 OF
OFFICIAL RECORDS OF ORANGE COUNTY.
ACCESSORS PARCEL NO.:430-191-08
FLOOR AREA RATIO:0.39
ZONING DESIGNATION:PROFESSIONAL (P)
LAND USE DESIGNATION:PROFESSIONAL & ADMINISTRATIVE OFFICE (PAO)
LOT NUMBER(S):LOT 116
LOT AREA:122,099 SF = 2.803 AC.
NUMBER OF STORIES:2
CONSTRUCTION TYPE:TYPE III-B
OCCUPANCY CLASSIFICATION:ASSEMBLY (A-3), BUSINESS (B), STORAGE (S-2)
*C.B.C. SEC. 508.3 NON-SEPARATED OCCUPANCIES
ALLOWABLE ACTUAL
BUILDING AREA:28,500 SF 23,538 SF
BUILDING HEIGHT:75 FT.+/-22 FT.
NO. OF STORIES:THREE TWO
ZONING:
REQUIRED PROVIDED
MAX. STRUCTURE HEIGHT:+35 FT.+/-22 FT.
SETBACKS:
FRONT:15 FT.54.28 FT.
SIDE (STREET ABUTMENT):15 FT.N/A
SIDE (INT. SIDE PROP. LINES): 5 FT.35.00 FT.
REAR (*):50 FT.N/A
REAR:10 FT.44.61 FT.
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
4
0
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A1.1
EXISTING SITE PLAN
(FOR REFERENCE ONLY)
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
1" = 20'-0"1EXISTING SITE PLAN (FOR REFERENCE ONLY)
NOTE: NO PUBLIC WAY EXISTS ALONG DAIMLER STREET OR ADJACENT STREETS
NO PROPOSED SITEWORK -PLAN &
TABULATIONS SHOWN FOR REFERENCE ONLY
CONDITIONS OF APPROVAL FOR CONDITIONAL USE PERMIT NO. 2022-13 (FOR REFERENCE)
NO
P
R
O
P
O
S
E
D
S
I
T
E
W
O
R
K
-
PL
A
N
&
TA
B
U
L
A
T
I
O
N
S
S
H
O
W
N
F
O
R
R
E
F
E
R
E
N
C
E
O
N
L
Y
WH
FD
FD
UP UP
UP
UP
UP
1 98765423
A
B
C
2.01
2.02
2.02
2.03
2.042.04
OFFICENURSERYVOID
MEETING ROOM
MEETING ROOM
MEETING ROOM
MEETING ROOM
MEETING ROOM
MEETING ROOM
LUNCH ROOM
F.R.
MEETING ROOM
STORAGE
STORAGE
STORAGE
STORAGE
AUDITORIUM
RR
RR
JAN
YOUTH
EXISTING AREA TO REMAIN
2.05
LOBBY
201' - 1" (EXISTING OVERALL BUILDING)
10
0
'
-
6
"
(
E
X
I
S
T
I
N
G
O
V
E
R
A
L
L
B
U
I
L
D
I
N
G
)
2.15
1
A5.1
1. ALL UTILITY LINES MUST BE CAPPED AS NECESSARY.
2. ANY DEVIATIONS FROM PLAN SHALL BE REPORTED TO ARCHITECT IMMEDIATELY UPON
DISCOVERY.
3. G.C. SHALL PROVIDE ALL TEMP. SHORING, SCAFFOLDING, BARRICADES, ETC. AS REQ. TO
COMPLETE DEMOLITION OF PREMISES. CONTRACTOR SHALL VERIFY AND OBTAIN
APPROVAL FROM OWNER OF ALL PROPOSED BARRICADES AND ACCESS LIMITATIONS
PRIOR TO COMMENCING WORK.
4. PRIOR TO BEGINNING DEMOLITION, G.C. SHALL VERIFY W/ OWNER & LOCAL UTILITY CO.,
EXACT LOCATIONS OF ALL UTILITIES WHICH MAY RUN THROUGH, ABV. OR BELOW
PREMISES. ALL WET AND DRY UTILITY LINES SHALL BE INVESTIGATED AND VERIFIED IN
FIELD PRIOR TO START OF WORK.
5. DEMOLITION DEBRIS SHALL NOT BE ALLOWED TO ACCUMULATE ON-SITE.
6. G.C. SHALL BE RESPONSIBLE FOR PROTECTION & SAFE-KEEPING OF ALL ITEMS NOTED ON
PLANS AS "EXISTING" OR "EXISTING SHALL REMAIN." ELEMENTS TO REMAIN WHICH ARE
DISCOVERED TO BE IN POOR OR DAMAGED CONDITION SHALL BE REPLACED AS REQ.
CONTACT ARCHITECT UPON DISCOVERY.
7. DEMOLITION SHALL INCLUDE REMOVAL OF ALL NON-STRUCTURAL ITEMS NOT
SPECIFICALLY MENTIONED BUT THAT WILL INTERFERE W/ PROPOSED WORK.
8. ANY DISCREPANCIES BETWEEN ACTUAL CONDITIONS & THOSE INDICATED IN THESE PLANS
REGARDING ITEMS TO REMAIN MUST BE IDENTIFIED & REPORTED TO ARCHITECT
IMMEDIATELY.
9. SPACES ADJACENT TO AREAS OF WORK SHALL BE PROTECTED PRIOR TO COMMENCING
WORK.
10. ALL LIGHT FIXTURES TO BE REMOVED INCLUDES REMOVING J-BOXES, CONDUIT, & WIRING,
U.N.O.
11. ALL UNUSED EQUIP. FEEDERS & CONDUIT SHALL BE WIRED BACK TO SOURCE, U.N.O.
12. ANY UNUSED CONDUIT CONCEALED IN FLOOR SHALL BE CAPPED OFF FLUSH W/ GRADE.
13. ANY (E) CONDUIT, UTILITY LINES, VENTS, ETC. WHICH ARE CONCEALED IN WALLS TO BE
DEMOLISHED SHALL BE LOCATED, PROTECTED & RE-ROUTED AS REQ.
14. MAINTAIN CONTINUITY OF CIRCUITS TO DEVICES WHICH ARE TO REMAIN. PROTECT ALL (E)
EQUIP., DEVICES, & BUILDING SURFACES THAT ARE TO REMAIN.
15. ALL DEVICES SHALL BE FULLY OPERATIONAL AFTER DEMOLITION WORK. PROVIDE (N)
CONDUIT & WIRE, OR SPLICE BOXES AS REQ. TO MAINTAIN EQUIP.
16. CONTRACTOR SHALL VERIFY LOCATION OF ANY SHEAR WALLS OR LOAD-BEARING WALLS &
NOTIFY ARCHITECT PRIOR TO START OF DEMOLITION.
17. THESE PLANS REPRESENT THE SCOPE OF WORK AS ACCURATELY AS POSSIBLE;
HOWEVER, IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND INSPECT ALL
EXISTING CONDITIONS IN FIELD, AND THEREFORE DETERMINE COMPLETE SCOPE OF
WORK, PRIOR TO BID.
18. CONTRACTOR SHALL VERIFY WITH OWNER ANY/ALL ITEMS WITHIN OR SURROUNDING
SUBJECT BUILDING TO BE PROTECTED AND/OR RELOCATED, AND BE FULLY RESPONSIBLE
FOR PROTECTION AND SAFE-KEEPING OF ITEMS. ALL EXISTING ELEMENTS ADJACENT TO
AREAS OF WORK MUST BE PROTECTED PRIOR TO COMMENCING WORK.
19. ALL FIRE ALARM AND SPRINKLER MODIFICATIONS ARE DESIGN-BUILD. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO VERIFY COMPLETE SCOPE OF WORK IN FIELD, PRIOR
TO BID.
DEMOLITION NOTES
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
4
2
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A2.1
DEMOLITION GROUND
FLOOR PLAN
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
TRUE
NORTH
PROJECT
NORTH
ARCHITECTURAL KEYNOTES
## DESCRIPTION
2.01 EXISTING DOORS TO BE REMOVED, FRAME TO REMAIN IN-PLACE
2.02 EXISTING AREA OF NON-LOAD-BEARING INTERIOR PARTITION TO BE REMOVED FOR
NEW OPENING
2.03 EXISTING FIRE EXTINGUISHER IN CABINET TO BE RELOCATED
2.04 EXISTING FLOORING AND WALL BASE TO BE REMOVED - CLEAN, GRIND DOWN, PATCH
AND PREP EXISTING CONC. SLAB TO RECEIVE NEW FINISHES
2.05 EXISTING CURTAIN TO BE REMOVED. REMOVE FLOORING AND PREP SLAB AS RQ'D TO
RECEIVE NEW PARTITION
2.15 EXISTING OVERHEAD DOOR TO BE REMOVED IN COMPLETE
1/8" = 1'-0"1DEMOLITION FLOOR PLAN
WH
FD
FD
UP UP
UP
UP
UP
EXISTING CONSTRUCTION SHALL REMAIN
LEGEND
REFER TO DOOR AND WALL SCHEDULES FOR MORE INFORMATION
PROPOSED CONSTRUCTION;
INTERIOR NON-LOAD-BEARING
FULL-HEIGHT TO UNDERSIDE OF ROOF / FLOOR
PROPOSED CONSTRUCTION:
INTERIOR NON-LOAD-BEARING
OPENING INFILL; PARTIAL-HEIGHT TO UNDERSIDE OF SOFFIT/HEADER
PROPOSED CONSTRUCTION;
EXTRIOR NON-LOAD-BEARING
OPENING INFILL; PARTIAL-HEIGHT TO UNDERSIDE OF SOFFIT/HEADER
1 98765423
A
B
C
2'
-
6
"
CLEAR
5' - 0"
15
'
-
6
"
5'
-
0
"
+/
-
1
3
'
-
5
"
(
V
E
R
I
F
Y
)
(E)
LOBBY
101
(E)
HALLWAY
102
(E)
MEETING
ROOM
103
(E)
MEETING
ROOM
104
(E)
MEETING
ROOM
105
(E)
MEETING
ROOM
106
STORAGE
107
(E) VOID
108
(E)
OFFICE
109
(E) I.T.
ROOM
110
(E)
MEETING
ROOM
111
(E)
LUNCH
ROOM
112
(E)
MEETING
ROOM
113
(E) JAN
114
(E) RR
115
(E) RR
116
NURSERY
117
NURSERY
118
(E)
LOBBY
119
(E)
AUDITORIUM
120
(E)
STORAGE
121
(E)
STORAGE
122
YOUTH
124
STORAGE
125
(E)
YOUTH
126
(E) F.R.
104A
+/
-
2
2
'
-
8
"
(
V
E
R
I
F
Y
)
18' - 1" (VERIFY)
(E)
ELECT
127
(VERIFY)
+/- 10' - 11" CLEAR
(V
E
R
I
F
Y
)
+/
-
9
'
-
1
"
20
'
-
0
"
HALLWAY
123
EQ
8'
-
0
"
EQ
ALIGN
EQ
6'
-
0
"
EQ
6"
3' -
0
"
3' -
5
"
MIN CLR
1' - 6"
3' - 6"6' - 0"
EQ
6'
-
0
"
EQ
5' - 0"13' - 1"
F.O.F.
F.O.F.
F.O.F.
EXISTING AREA TO REMAIN
8.02
9.01
8.01
201' - 1" (EXISTING OVERALL BUILDING)
10
0
'
-
6
"
(
E
X
I
S
T
I
N
G
O
V
E
R
A
L
L
B
U
I
L
D
I
N
G
)
21.01
5
A5.1
4
A5.1
3
A5.1
14
A8.1
F.O.F.
F.O.F.
3'
-
0
"
4"
8.03
8.04
5.01
(E
)
A
R
E
A
O
F
I
N
F
I
L
L
-
V
I
F
10
'
-
4
"
1
A5.1
2
A5.1
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
4
3
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A2.2
PROPOSED GROUND
FLOOR PLAN
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
ARCHITECTURAL KEYNOTES
## DESCRIPTION
5.01 NEW WALL INFILL WITH EXTERIOR METAL PANEL FINISH
8.01 NEW DOOR & FRAME PER SCHEDULE, TYP.
8.02 EXISTING FRAMED OPENING TO REMAIN - REMOVE ALL DOOR HARDWARE, PATCH,
REPAIR, CLEAN & RE-PAINT
8.03 NEW INTERIOR WINDOW; 8'-0" W X 4'-0" H, SILL HEIGHT = 2'-6" A.F.F.
8.04 NEW EXTERIOR DOUBLE DOOR PER SCHEDULE
9.01 NEW INTERIOR NON-LOAD-BEARING PARTITION - SEE LEGEND AND WALL SCHEDULE
FOR MORE INFO
21.01 RELOCATED 2-A/10B/C FIRE EXTINGUISHER IN WALL-MOUNTED SEMI-RECESSED
CABINET; MOUNT AT 40" A.F.F. OR PER FIRE INSPECTOR
1/8" = 1'-0"1PROPOSED FLOOR PLAN
TRUE
NORTH
PROJECT
NORTH
DN
(OPEN TO BELOW)
PROJECT
NORTH
TRUE
NORTH
1 98765423
A
B
C
10
0
'
-
6
"
(
E
X
I
S
T
I
N
G
O
V
E
R
A
L
L
B
U
I
L
D
I
N
G
)
201' - 1" (EXISTING OVERALL BUILDING)
36' - 2" 24' - 8" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 19' - 7"0' - 8"
ADJACENT TENANT (NOT IN SCOPE)
50
'
-
3
"
5
0
'
-
3
"
(E)
HALLWAY
201
(E)
OFFICE
202
(E)
OFFICE
203
(E)
OFFICE
204
(E)
OFFICE
205
(E)
OFFICE
206
(E)
STOR
207
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
4
4
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A2.3
EXISTING SECOND
FLOOR PLAN (FOR
REFERENCE ONLY)
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
1/8" = 1'-0"1EXISTING SECOND FLOOR PLAN
NO PROPOSED WORK AT SECOND FLOOR -
PLAN SHOWN FOR REFERENCE ONLY
NO
P
R
O
P
O
S
E
D
W
O
R
K
A
T
S
E
C
O
N
D
F
L
O
O
R
-
PL
A
N
S
H
O
W
N
F
O
R
R
E
F
E
R
E
N
C
E
O
N
L
Y
1 98765423
A
B
C
10
0
'
-
6
"
(
E
X
I
S
T
I
N
G
O
V
E
R
A
L
L
B
U
I
L
D
I
N
G
)
201' - 1" (EXISTING OVERALL BUILDING)
2.13
ADJACENT TENANT (NOT IN SCOPE)
2.112.12
EXISTING 3-HOUR FIRE WALL
2.14
23.01
13
A8.1
RTU-11
RTU-12
13
A8.1
23.01
(E) RTU-10A
RTU-10A
23.0323.03
13
A8.1
13
A8.1
13
A8.1
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
4
4
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A2.4
ROOF PLAN
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
ARCHITECTURAL KEYNOTES
## DESCRIPTION
2.11 EXISTING PARAPET WALL TO REMAIN - PROTECT IN PLACE
2.12 EXISTING ROOFING TO REMAIN - PROTECT IN PLACE
2.13 EXISTING ROOF LADDER TO REMAIN - PROTECT IN PLACE
2.14 EXISTING ROOFTOP MECHANICAL UNIT TO REMAIN - PROTECT IN PLACE, TYP. U.N.O.
23.01 NEW ROOFTOP MECHANICAL UNIT - SEE MECHANICAL PLANS FOR COMPLETE SCOPE OF
WORK. PATCH, REPAIR AND PROVIDE FLASHING AT EXISTING ROOFING PER DTL - VERIFY
ALL EXACT CONDITIONS IN FIELD.
23.03 EXISTING ROOFTOP MECHANICAL UNIT TO BE RELOCATED AS SHOWN - SEE MECHANICAL
PLANS FOR COMPLETE SCOPE OF WORK. PATCH, REPAIR AND PROVIDE FLASHING AT
EXISTING ROOFING PER DTL - VERIFY ALL EXACT CONDITIONS IN FIELD. INFILL, PATCH &
REPAIR ROOFING AT EXISTING ABANDONED LOCATION.
TRUE
NORTH
PROJECT
NORTH
1/8" = 1'-0"1ROOF PLAN
NOTE: CONTRACTOR SHALL VERIFY EXISTING ROOF ASSEMBLY IN FIELD, AND ANY
AVAILABLE SPECIFICATIONS AND WARRANTY INFORMATION WITH OWNER, PRIOR TO BID.
ALL AREAS OF REPAIR AND REPLACEMENT SHALL BE IN ACCORDANCE WITH OWNER'S AND
ROOF ASSEMBLY MANUFACTURER'S REQUIREMENTS, AND WARRANTY INSTRUCTIONS AS
APPLICABLE.
1 9765423
A
B
C
10
0
'
-
6
"
(
E
X
I
S
T
I
N
G
O
V
E
R
A
L
L
B
U
I
L
D
I
N
G
)
201' - 1" (EXISTING OVERALL BUILDING)
(OPEN
CEILING)
(OPEN
CEILING)
EXISTING AREA TO REMAIN
OFFICENURSERYVOID
MEETING ROOM
MEETING ROOM
MEETING ROOM
MEETING ROOM
MEETING ROOM
MEETING ROOM
LUNCH ROOM
F.R.
MEETING ROOM
STORAGE
STORAGE
STORAGE
STORAGE
AUDITORIUM
RR
RR
JAN
YOUTH
LOBBY
2.06
9' - 0"
B.O. (E) SOFFIT
2.072.07
2.10
2.10
NOTE -CONTRACTOR TO
V.I.F. PRIOR TO BID
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
4
7
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A4.1
DEMOLITION GROUND
FLOOR REFLECTED
CEILING PLAN
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
TRUE
NORTH
PROJECT
NORTH
ARCHITECTURAL KEYNOTES
## DESCRIPTION
2.06 EXISTING SUSPENDED LIGHT FIXTURE TO BE RELOCATED
2.07 EXISTING CEILING & LIGHTING TO BE REMOVED FOR INSTALLATION OF NEW FULL-HEIGHT
PARTITIONS, AND RE-INSTALLED. COORDINATE EXACT AND COMPLETE SCOPE OF WORK
IN FIELD PRIOR TO BID; FIELD VERIFY CONDITION OF TILES PRIOR TO REMOVAL, PATCH,
REPAIR AND/OR REPLACE ANY EXISTING DAMAGED TILES/GRID, OR TILES/GRID THAT
BECOME DAMAGED DURING REMOVAL AND REINSTALLATION, PROVIDE NEW PERIMETER
TRIM THROUGHOUT. VERIFY EXISTING INSULATION ABOVE CEILING - RE-INSTALL; OR IF
NONE, PROVIDE NEW ACOUSTIC BATT INSULATION ABOVE CEILINGS. REINSTALL ALL
LIGHT FIXTURES AS SHOWN; PROVIDE WIRING / SWITCH MODIFICATIONS - SEE
ELECTRICAL PLANS FOR COMPLETE LIGHTING SCOPE.
2.10 EXISTING REGISTERS / PORTION OF DUCTWORK TO BE REMOVED - SHOWN FOR
REFERENCE ONLY, SEE MECHANICAL PLANS FOR COMPLETE SCOPE
1/8" = 1'-0"1DEMOLITION FIRST FLOOR REFLECTED CEILING PLAN
CEILING & LIGHTING LEGEND
EXISTING
ILLUMINATED EMERGENCY SIGN -
CEILING / WALL MOUNTED
PROPOSED
SUSPENDED PENDANT LIGHT FIXTURE
B.O. FIXTURE = 14'-0" A.F.F.*A
1. MEANS OF EGRESS LIGHTING SHALL BE PROVIDED W/ AN
ILLUMINATION LEVEL OF NOT LESS THAN 1 FOOT-CANDLE @ THE
WALKING SURFACE. (C.B.C. §1008.2)
2. WHERE BUILDINGS, ROOMS, OR SPACES REQUIRE TWO OR MORE
MEANS OF EGRESS AN EMERGENCY POWER BACKUP SUPPLY SHALL
BE PROVIDED FOR A DURATION OF NOT LESS THAN 90 MIN. (C.B.C. §
1008.3 THRU §1008.3.4)
3. VERIFY ALL EXISTING CONDITIONS IN FIELD UPON DEMOLITION &
NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES RELATED
TO CEILINGS, STRUCTURE, LIGHTING, OR MECHANICAL
INFORMATION.
4. DUCTWORK, CONDUIT, PIPE, WIRE, ETC. SHALL BE HIDDEN FROM
VIEW & CONCEALED W/IN WALL FRAMING, FLOOR FRAMING,
SOFFITS, CHASES, & CEILING PLENUM SPACES WHENEVER
POSSIBLE. IF VISIBLE, DUCTWORK, CONDUIT, PIPE, WIRE, ETC.
SHALL BE INSTALLED IN A NEAT & ORDERLY MANNER. EXT. FINISH
SHALL BE MODIFIED (I.E. PAINT) TO MATCH NEAREST ADJACENT
SURFACE.
5. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED.
(C.B.C. §1013.3)
6. ELECTRICALLY POWERED EXIT SIGNS SHALL BE LISTED & LABELED
IN ACCORDANCE W/ UL 924. (C.B.C. §1013.5)
7. EMERGENCY POWER SUPPLY TO ILLUMINATE EXIT SIGNS FOR A
DURATION OF NOT LESS THAN 90 MIN.
8. IN EVENT OF POWER SUPPLY FAILURE, AN EMERGENCY ELECTRICAL
SYSTEM SHALL AUTOMATICALLY ILLUMINATE AISLES, LOBBY,
CORRIDOR, & EXT. DOOR LANDING. EMERGENCY POWER SYSTEM
SHALL PROVIDE POWER FOR A DURATION OF NOT LESS THAN 90
MIN. & SHALL CONSIST OF STORAGE BATTERIES, UNIT EQUIPMENT
OR AN ON-SITE GENERATOR. INITIAL ILLUMINATION AVERAGE OF 1
FOOT-CANDLE & MIN. 0.1 FOOT-CANDLE @ FLOOR LEVEL. (C.B.C.
1008.3.4.)
9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE
INSTALLATION OF ALL TRADES, INCLUDING DUCTWORK, CONDUIT,
UTILITY LINES, AND FIXTURES. AT EXPOSED/OPEN CEILINGS,
DUCTWORK SHALL BE MOUNTED ABOVE LIGHT FIXTURES AS HIGH
AS POSSIBLE -CONTRACTOR SHALL NOTIFY ARCHITECT
IMMEDIATELY OF ANY DISCREPANCIES AS TO MOUNTING HEIGHTS
OF ALL EXPOSED COMPONENTS, OR ANY EXISTING UNFORESEEN
CONDITIONS PREVENTING COMPLIANCE WITH MOUNTING HEIGHTS
PER PLANS
10. ALL EXPOSED ELEMENTS SHALL BE PAINTED TO MATCH ADJACENT
SURFACE UNLESS NOTED OTHERWISE. ALL EXPOSED REGISTERS
SHALL HAVE FINISH TO MATCH ADJACENT SURFACE.
NOTES
RELOCATED SUSPENDED PENDANT LIGHT FIXTURE -
B.O. FIXTURE = 14'-0" A.F.F.*A (R)
*VERIFY FINAL EXISTING RELOCATED / NEW
PENDANT LOCATIONS WITH EMERGENCY
BACKUP REQUIREMENTS -SEE ELECT.
ILLUMINATED EMERGENCY SIGN -
CEILING / WALL MOUNTED(N)
SUSPENDED LINEAR LIGHT FIXTURE
B.O. FIXTURE = 12'-0" A.F.F.B
1 9765423
A
B
C
10
0
'
-
6
"
(
E
X
I
S
T
I
N
G
O
V
E
R
A
L
L
B
U
I
L
D
I
N
G
)
201' - 1" (EXISTING OVERALL BUILDING)
(OPEN
CEILING)
NURSERY
118
NURSERY
117
(E)
STORAGE
122
YOUTH
124
STORAGE
125
(E)
YOUTH
126
EQ 16' - 0"EQ
EQ
32
'
-
0
"
EQ
13' - 0"
EQ
EQ
EQ EQ
EQ
8'
-
0
"
8'
-
0
"
8'
-
0
"
8'
-
0
"
EQ
(OPEN
CEILING)
(OPEN
CEILING)
EQ 8' - 0"8' - 0"EQ
EQ
EQ
HALLWAY
123
EXISTING AREA TO REMAIN
(N)
(N)
(N)
(E)
OFFICE
109STORAGE
107
(E) VOID
108
(E)
STORAGE
121
(E)
AUDITORIUM
120
(E) I.T.
ROOM
110
(E)
MEETING
ROOM
111
(E)
MEETING
ROOM
104
(E)
MEETING
ROOM
103
(E)
MEETING
ROOM
105
(E)
HALLWAY
102
(E)
LUNCH
ROOM
112
(E) RR
115
(E) RR
116
(E)
MEETING
ROOM
113(E)
LOBBY
101
(E)
HALLWAY
102
(E)
LOBBY
119
9' - 0"
9' - 0"
5
A5.1
4
A5.1
3
A5.1
26.01
26.01
A A
A (R)
A
A
B
B
B
B
B
B
B
B B B
5'
-
0
"
45°
(N)
2.072.07
2
A5.1
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
5
1
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A4.2
PROPOSED GROUND
FLOOR REFLECTED
CEILING PLAN
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
ARCHITECTURAL KEYNOTES
## DESCRIPTION
2.07 EXISTING CEILING & LIGHTING TO BE REMOVED FOR INSTALLATION OF NEW FULL-HEIGHT
PARTITIONS, AND RE-INSTALLED. COORDINATE EXACT AND COMPLETE SCOPE OF WORK IN
FIELD PRIOR TO BID; FIELD VERIFY CONDITION OF TILES PRIOR TO REMOVAL, PATCH, REPAIR
AND/OR REPLACE ANY EXISTING DAMAGED TILES/GRID, OR TILES/GRID THAT BECOME
DAMAGED DURING REMOVAL AND REINSTALLATION, PROVIDE NEW PERIMETER TRIM
THROUGHOUT. VERIFY EXISTING INSULATION ABOVE CEILING - RE-INSTALL; OR IF NONE,
PROVIDE NEW ACOUSTIC BATT INSULATION ABOVE CEILINGS. REINSTALL ALL LIGHT
FIXTURES AS SHOWN; PROVIDE WIRING / SWITCH MODIFICATIONS - SEE ELECTRICAL PLANS
FOR COMPLETE LIGHTING SCOPE.
26.01 NEW SUSPENDED LIGHT FIXTURE PER ELECTRICAL PLANS, TYP.
1/8" = 1'-0"1PROPOSED FIRST FLOOR REFLECTED CEILING PLAN
TRUE
NORTH
PROJECT
NORTH
ACOUSTIC BATT INSULATION
FULL-DEPTH OF STUD
(1) LAYER 5/8" GYP. BD.
6" 20 GA. MTL STUDS PER
SCHEDULE
(1) LAYER 5/8" GYP. BD.
(E) INSULATION -VERIFY
(E) ROOF FRAMING -VERIFY
(E) MEMBRANE ROOFING
SYSTEM O/ SHEATHING -
VERIFY
+/
-
2
0
'
-
0
"
-
(
E
)
V
E
R
I
F
Y
WALL BASE PER SCHEDULE
FLOOR FINISH PER
SCHEDULE -WHERE OCCURS
(E) CONC SLAB & FOOTINGS -
VERIFY
A8.1
1
A8.1
2
WALL BASE PER SCHEDULE
(E) CONC SLAB & FOOTINGS -
VERIFY
9'
-
0
"
-
B
.
O
.
(
E
)
S
O
F
F
I
T
,
V
.
I
.
F
.
AL
I
G
N
AL
I
G
N
ACOUSTIC BATT INSULATION
FULL-DEPTH OF STUD
(1) LAYER 5/8" GYP. BD.
6" 20 GA. MTL STUDS PER
SCHEDULE -VERIFY IN FIELD;
ALIGN WITH SOFFIT FRAMING
ABOVE BOTH SIDES OF WALL
(1) LAYER 5/8" GYP. BD.
EXISTING BOX BEAM /
HEADER -VERIFY
EXISTING SOFFIT & WALL
FRAMING & FINISH -VERIFY
REMOVE (E) GYP. BD. FINISH
AT B.O. HEADER TO RECEIVE
OPENING INFILL WITH NEW
MTL STUD PARTITION
A8.1
1
ACOUSTIC BATT INSULATION
FULL-DEPTH OF STUD
(1) LAYER 5/8" GYP. BD.
3 5/8" 20 GA. MTL STUDS PER
SCHEDULE
(1) LAYER 5/8" GYP. BD.
(E) SUSPENDED ACOUSTIC
CEILING TILE SYSTEM;
REMOVED & REINSTALLED
WITH NEW PERIMETER TRIM
9'
-
0
"
-
B
.
O
.
(
E
)
C
L
N
G
,
V
.
I
.
F
.
A8.1
2
A8.1
1 WALL BASE PER SCHEDULE
FLOOR FINISH PER SCHEDULE -
WHERE OCCURS
(E) CONC SLAB & FOOTINGS -
VERIFY
11
'
-
0
"
-
(
E
)
S
E
C
O
N
D
F
L
O
O
R
,
V
.
I
.
F
.
SIM
RE-INSTALL (E) INSULATION,
OR PROVIDE NEW IF NONE
(E) -VERIFY IN FIELD
(E) SECOND FLOOR FRAMING
& SHEATHING -VERIFY IN
FIELD
B
10
'
-
0
"
8.04 5.01
5.02
2
A5.1
25
A8.1
24
A8.1
25
A8.1
2'
-
0
"
8'
-
0
"
SIM
21
A8.1
SIM
23
A8.1
MTL. PANEL SIDING PER
EXTERIOR ELEVATIONS
5/8" EXTERIOR-RATED
PLYWD SHEATHING
3-5/8" 20 GA. STUD PER
SCHEDULE W/ R-13 BATT
INSUL.
TYVEK COMMERCIAL WRAP
(E) CONC. TILT-UP PANEL
CONT. MTL. CHANNEL
TOP TRACK &
ATTACHMENT -SEE DTL
(1) LAYER 5/8" GYP.BD. -
ALIGN WITH ADJ. FINISH
WALL BASE AS
SPECIFIED
FINISH FLR. AS SPECIFIED
OVER (E) CONC. SLAB
CONT. MTL. CHANNER
RUNNER & ATTACHMENT /
EMBEDMENT -SEE DTL
(E) ROOF STRUCTURE
A8.1
22
A8.1
23
10
'
-
0
"
(
E
)
O
P
E
N
I
N
G
I
N
F
I
L
L
-
V
E
R
I
F
Y
CONC. CURB
(E) CONC. SLAB &
FOOTINGS -VERIFY
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
5
2
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A5.1
ELEVATIONS &
SECTIONS
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
3/4" = 1'-0"3WALL SECTION B (FULL-HT)3/4" = 1'-0"5WALL SECTION D (INT. INFILL)3/4" = 1'-0"4WALL SECTION C (FULL-HT)
1/4" = 1'-0"1EAST ELEVATION @ INFILL
3/4" = 1'-0"2WALL SECTION A (EXT INFILL)
ARCHITECTURAL KEYNOTES
## DESCRIPTION
5.01 NEW WALL INFILL WITH EXTERIOR METAL PANEL FINISH
5.02 EXTERIOR METAL WALL PANELS TO MATCH ADJACENT: MTL. PANEL SIDING; MFR.: METAL SALES, STYLE NO.:
TL-17D, COLOR: METALLIC SILVER, INSTALLATION: HORZ.
8.04 NEW EXTERIOR DOUBLE DOOR PER SCHEDULE
1. ALL METAL STUDS USED SHALL BE PER ICC-ESR-3064P.
2. ALL BRIDGING, BLOCKING OR END BEARING STIFFENERS SHALL BE AS REQUIRED BY
MANUFACTURER UNLESS NOTED OTHERWISE ON THE DRAWINGS.
3. ALL STUDS SHALL CONFORM TO ICC-ESR-3064P.
4. UNLESS OTHERWISE NOTED ON PLANS, SEE FOLLOWING GUIDELINE FOR STUD SIZE &
SPACING FOR INTERIOR PARTITIONS (DRYWALL FINISH ON BOTH SIDES).
5. TOP WIDE FLANGE SLIP TRACK ATTACHED TO STRUCTURE SHALL BE PER SCHEDULE
BELOW.
6. PROVIDE NO. 6 TYPE 'S' DRYWALL SCREWS SPACED @ 12" O.C. FOR STUDS @ 24"
SPACING, & 16" O.C. FOR STUDS @ 12" & 16" SPACING.
7. PROVIDE 16 GA. SLIP TRACK WHERE NOTED
COMPOSITE LIMITING HEIGHTS, DEFLECTION LIMIT L/120, 5 PSF
SIZE
362S125-33
400S125-33
600S125-33
SPACING
16"
12"
16"
HEIGHT
21' -1"
25' -3"
32' -1"
SPACING
24"
24"
24"
HEIGHT
17' -5"
20' -1"
27' -10"
NOTE:
FASTENER PENETRATION: WOOD
PENETRATION SHALL BE LONG ENOUGH TO PENETRATE INTO WOOD FRAMING MEMBERS NOT
LESS THAN:
• SCREWS -5/8"
• NAILS -3/4"
FASTENER PENETRATION: STEEL
• SCREWS INTO METAL MEMBERS NOT LESS THAN 3/8"
GYP. BD.
THICKNESS
5/8"
5/8"
5/8"
5/8"
5/8"
ERECTION OF
FRAMING
HORIZONTAL
VERTICAL
HORIZONTAL
VERTICAL
HORIZONTAL
MAX. FRAMING
SPACING
24" O.C.
16" O.C.
16" O.C.
24" O.C.
24" O.C.
MAX. NAIL
SPACING
8" O.C.
8" O.C.
7" O.C.
7" O.C.
8" O.C.
MAX. SCREW
SPACING
12" O.C.
16" O.C.
12" O.C.
12" O.C.
12" O.C.
TYPE SCREWS
TYPE 'S' SCREWS
TYPE 'S-12' SCREWS
TYPE 'W' SCREWS
ATTACHMENT APPLICATION
GYP. TO LIGHT-GA. STL. FRAMING (NON-LOAD BEARING)
GYP. TO HEAVY-GA. STIL. FRAMING (STRUCTURAL)
GYP. TO WOOD FRAMING
SCREW TYPE & APPLICATION TABLE
FASTENER SPACING - (1) LAYER GYP. BD.
2"
1/2"1/2"
(1) LAYER 5/8"
GYP.BD. EA. SIDE
MTL. STUD WALL PER
PLAN W/ BATT INSUL.
MTL. BOX BEAM @
HEAD
PROVIDE SEALANT
@ BOTH SIDES, TYP.
PAINTED H.M. FRAME
JAMB BEYOND
S.C.W. DOOR WITH WD
VNR FINISH
2"
1/
2
"
1/
2
"
(1) LAYER 5/8" GYP.BD.
BOTH SIDES
MTL. STUD WALL PER
PLAN W/ BATT INSUL.
DBL. MTL. STUD
PROVIDE SEALANT
@ BOTH SIDES, TYP.
PAINTED H.M. FRAME
S.C.W. DOOR WITH WD
VNR FINISH
H.M. JAMB BEYOND
BURKE TRANSITION STRIP AS RQ'D
FLOORING -VERIFY
1
2
MAX. SLOPE
1/
4
"
M
A
X
.
S.C.W. DOOR WITH WD
VNR FINISH
5/
8
"
1
1
/
4
"
5/
8
"
2
1
/
2
"
1"1/4"
SIDE VIEW
SECTION
WIDTH VARIES
STUD WALL
ISOMETRIC
1/
2
"
1
1
/
4
"
1
1
/
4
"
DRYWALL SCREWS, TYP.
#8 x 9/16" WAFERHEAD
FRAMING SCREWS @ EA. STUD
TO TRACK (16" O.C. MAX.), TYP.;
ENGAGE SCREWS @ LEAST 3
THREADS -DO NOT FULLY
TIGHTEN SCREWS
METAL STUD WALL
SLOTTED TRACK
STRUCTURE
(2) #10 SMS SCREWS
@ 16" O.C.
DIAGONAL BRACE
WHERE OCCURS
2x WD. BLKG. TO
MATCH PURLIN SIZE
(E) INSULATION W/
SCRIM
(E) ROOF SHEATHING &
FRAMING -VERIFY
16 GA. MIN.
SLOTTED TRACK
#8 WAFERHEAD
SCREW EA. SIDE
(2) #10 SCREWS
PER MEMBER
A8.1
4
EXTEND WALL FRAMING,
FINISH AND INSULATION TO
B.O. ROOF DECKING
1
1
/
2
"
(E) PLYWD. ROOF SHEATHING
(2) 2x WD. BLKG. TO
MATCH PURLIN SIZE
(E) INSULATION W/ SCRIM
(E) PURLIN FRAMING
16 GA. MIN.
SLOTTED TRACK
#8 WAFERHEAD
SCREW EA. SIDE
ACOUS. INSUL. FULL
DEPTH OF STUD
5/8" GYP.BD. EA. SIDE,
PROVIDE FASTENERS
PER
(2) #10 SCREWS
PER MEMBER
MI
N
.
1/
2
"
A8.1
4
1
1
/
2
"
PARALLEL
PERPENDICULAR
MTL STUDS
PER
10
A8.1
9
A8.1
ACOUS. INSUL. FULL
DEPTH OF STUD
5/8" GYP.BD. EA. SIDE,
PROVIDE FASTENERS
PER
MTL STUDS
PER
10
A8.1
9
A8.1
(E) CONC. SLAB
FLOORING PER FIN. SCHED.
SEALANT EA. SIDE
WALL BASE PER FIN.
SCHED.
HILTI X-U UNIVERSAL
POWER-DRIVEN FASTENER
W/ 1" MIN. EMBED @ 16"
O.C. (ICC #ESR 2269)
ACOUS. INSUL. FULL
DEPTH OF STUD
5/8" GYP.BD. EA. SIDE,
PROVIDE FASTENERS
PER
MTL STUDS
PER
10
A8.1
9
A8.1
ASSISTIVE
LISTENING
SYSTEMS
AVAILABLE
R 1/2" TYP.
NOTES:
1. MIN. 1" LETTERS & NUMBERS WITH CONTRASTING BACKGROUND.
2. LOCATE SIGN IN VISIBLE LOCATION OR AS DETERMINED BY THE FIRE MARSHAL.
3. MOUNT AT HEIGHT PER
0'
-
6
"
1' - 0"
16
A8.1
MAXIMUM
OCCUPANCY
XX PERSONS
R 1/2" TYP.
NOTES:
1. MIN. 1" LETTERS & NUMBERS WITH CONTRASTING BACKGROUND.
2. LOCATE SIGN IN VISIBLE LOCATION OR AS DETERMINED BY THE FIRE MARSHAL.
3. MOUNT AT HEIGHT PER
0'
-
6
"
16
A8.1
SEE SIGNAGE NOTES, FOR MORE INFO.
SIGNS SHALL BE MOUNTED AT LATCH SIDE OF DOOR PER
EXIT
R 1/2" , TYP.
6"
4"
BRAILLE TEXT, TYP.
RAISED TACTILE TEXT, TYP.
WHERE PERMANENT IDENTIFICATION IS PROVIDED FOR ROOMS & SPACES, RAISED LETTERS
SHALL ALSO BE PROVIDED. THESE LETTERS SHALL BE SANS SERIF UPPERCASE SIZED PER
11B-703.5, AND ACCOMPANIED BY GRADE 2 BRAILLE SIZED PER 11B-703.3.1.
16
A8.1
11
A8.1
TYP.
9"EQ EQ
60
"
M
A
X
A
.
F
.
F
.
T
O
H
I
G
H
E
S
T
C
H
A
R
A
C
T
E
R
S
48
"
M
A
X
A
.
F
.
F
.
T
O
L
O
W
E
S
T
B
R
A
I
L
L
E
F.F.
48" MIN. A.F.F. OR GROUND
SURFACE, MEASURED FROM
BASELINE OF LOWEST LINE
OF BRAILLE CELLS & 60" MAX.
A.F.F. OR GROUND SURFACE,
MEASURED FROM BASELINE
OF HIGHEST LINE OF RAISED
CHARACTERS PER C.B.C.
11B-703.4.1
58
"
M
I
N
.
-
6
0
"
M
A
X
.
,
T
Y
P
.
ME
A
S
U
R
E
D
F
R
O
M
C
E
N
T
E
R
O
F
S
I
G
N
TO
F
.
F
.
P
E
R
C
.
B
.
C
.
7
0
3
.
7
.
2
.
6
WALL SIGN ALONG LATCH SIDE OF
DOOR (OR NEAREST ADJACENT
WALL) W/ CLEAR FLOOR SPACE OF
18" x 18", CENTERED ON TACTILE
CHARACTERS, PROVIDED BEYOND
ARC OF DOOR SWING, TYP. PER
C.B.C. 11B-703.4.2
DOOR SIGN, TYP.
1. CHARACTER TYPE:
CHARACTERS ON SIGNS SHALL BE RAISED 1/32" (0.794 MM) MINIMUM & SHALL BE SANS
SERIF UPPERCASE CHARACTERS ACCOMPANIED BY BRAILLE (SEE NOTE #4 BELOW).
2. CHARACTER SIZE:
RAISED CHARACTERS SHALL BE A MINIMUM OF 5/8" (15.9 MM) & A MAXIMUM OF 2" (51
MM) HIGH, BASED ON HEIGHT OF UPPERCASE LETTER "I". ( C.B.C. 11B-703.2.5)
3. PROPORTIONS:
VISUAL CHARACTERS ON SIGNS SHALL BE SELECTED FROM FONTS WHERE WIDTH OF
UPPERCASE LETTER "O" IS 60% MINIMUM & 110% MAXIMUM OF HEIGHT OF UPPERCASE
LETTER "I". STROKE THICKNESS OF UPPERCASE LETTER "I" SHALL BE 15% MAXIMUM OF
HEIGHT OF CHARACTER. (C.B.C. 11B-703.2.4 & 11B-703.2.6)
4. BRAILLE:
CONTRACTED (GRADE 2) BRAILLE SHALL BE USED WHEREVER BRAILLE IS REQUIRED IN
OTHER PORTIONS OF THESE STANDARDS. BRAILLE DIMENSIONS SHALL COMPLY WITH
C.B.C. TABLE 11B-703.3.1.
MI
N
.
0.
3
9
5
"
MA
X
.
0
.
4
0
0
"
0.100"
0.300"
0.
0
5
9
M
I
N
.
0.
0
6
3
M
A
X
.
0.
0
3
7
"
M
A
X
.
0.
0
2
5
"
M
I
N
.
BRAILLE DOT
RAISED SECTION:
ROUNDED DOT (ACCEPTABLE)
SQUARE DOT (NOT ACCEPTABLE)
BRAILLE CELL
WALL PER PLAN
GYP. BD. PER WALL
TYPE
ACOUSTIC BATT
INSULATION, FULL-DEPTH
OF STUD
SECTION
PLAN
HEADER PER STRUCT.
1/8" CLR TEMPERED GLASS,
ANGLED
1/4" CLEAR OR TINTED
LAMINATED SAFETY GLASS
CONT. ACOUSTIC
SEALANT, TYP.
CONT. ACOUSTIC
SEALANT, TYP.
1/4" CLEAR OR TINTED
LAMINATED SAFETY
GLASS
WALL PER PLAN
GYP. BD. PER WALL TYPE
1/8" CLR TEMPERED GLASS,
ANGLED
12 GA. STEEL FRAME,
POWDER-COATED WITH
SELF-TAPPING MTL
SCREWS @ 12" O.C.
1"
1"
ACOUSTIC FOAM
UNDERNEATH LINER
ACOUND ENTIRE FRAME
1"
1/8" THK FOAM
GLAZING TAPE
ACOUSTIC FOAM
UNDERNEATH LINER
ACOUND ENTIRE FRAME
1/8" THK FOAM
GLAZING TAPE
12 GA. STEEL FRAME,
POWDER-COATED WITH
SELF-TAPPING MTL
SCREWS @ 12" O.C.
NOTES
A. WINDOW FRAMES SHALL BE 1 ¼ IN. THICK FABRICATED FROM NOT LESS THAN 12 GAUGE STEEL,
REINFORCED AND FILLED WITH SOUND-ABSORBING ACOUSTIC FILL, INSIDE AND OUTSIDE
CORNERS SHALL BE MITERED AND INTERLOCKED TO HAIRLINE MEASUREMENTS, MADE SQUARE,
CONTINUOUSLY WELDED , AND GROUND SMOOTH, FLUSH, AND INVISIBLE.
B. STOPS SHALL BE UP TO 1 INCH THICK AND READILY REMOVABLE, FABRICATED FROM NOT LESS
THAN 16 GAUGE ROLLED STEEL SECTIONS PREDRILLED AND ALIGNED WITH FRAME TO FORM
TIGHT SQUARE ACOUSTICAL JOINT. STOP FASTENERS SHALL BE CONCEALED.
C. ACOUSTIC SEALS FOR GLAZING SHALL BE VIBRATION-ISOLATING RESILIENT CLOSED-CELL
POLYETHYLENE FOAM GLAZING TAPE. GLAZING TAPE MUST BE DESIGNED TO WITHSTAND
ENVIRONMENTAL BREAKDOWN AND MAINTAIN AN EFFECTIVE SEAL.
8
I
N
.
M
I
N
.
4
I
N
.
M
I
N
.
EXISTING ROOF MEMBRANE -VERIFY
SARNAFIL FLASHING MEMBRANE,
HOT-AIR WELD
SPECIFIED SARNAFIL SECUREMENT
SARNAFIL FLASHING TO ACCEPTABLE
SUBSTRATE
MTL. EXTENDER PIECE AS REQ.
SIKAFLEX -1A SEALANT (SEE NOTE)
GROMMETTED FASTENER 12" O.C.
MECHANICAL EQUIPMENT WITH FABRICATED
CURB AS SPECIFIED
NOTE: MTL. EXTENDER PIECE IS REQ. IF EXISTING COUNTERFLASHING IS CONTAMINATED &/OR
COUNTERFLASHING FASCIA IS LESS THAN 4" WIDE. FASTENED 12" O.C. W/ GROMMETTED FASTENER.
FRAMING O/ SLOPED/SHAPED CURB -SEE
STRUCT & MECH PLANS FOR FULL SCOPE
EXIT
ROUTE
R 1/2" , TYP.
6"
6"
BRAILLE TEXT, TYP.
RAISED TACTILE TEXT, TYP.
SEE SIGNAGE NOTES, FOR MORE INFO.
SIGNS SHALL BE MOUNTED AT LATCH SIDE OF DOOR PER
16
A8.1
11
A8.1
MTL. PANEL AS SPECIFIED
MTL STUDS PER WALL TYPE
CORNER BEAD, TYP.
CONT. BACKER ROD AND
SEALANT
FOAM CLOSURE (WHERE
OCCURS)
METAL CLOSURE / HEAD TRIM
WITH DRIP EDGE PER MANUF.
(PROVIDE J-METAL TRIM AT
SHEATHING)
DOOR AS SPECIFIED
INTERIOR
EXTERIOR
GYP. BD. FINISH
EXTERIOR SHEATHING PER
WALL TYPE
TYVEK COMMERCIAL WRAP
UP/AROUND OPENING
HEADER PER STRUCT.
DOOR PER SCHED.
JAMB BEYOND
ALUM. THRESHOLD; CUT
DOWN, MITER & SCRIBE
ENDS; SET IN CONT.
SEALANT
1
2
MAX. SLOPE
1/
4
"
M
A
X
.
(E) CONC. SLAB & ADJ.
PAVING -V.I.F.
(E) OR NEW EXPANSION JT
FILLER (1/2")
INTERIOREXTERIOR
METAL PANEL AS SPECIFIED
TYVEK COMMERCIAL WRAP
SHEATHING AS SPECIFIED
STUD WALL PER PLAN
5/8" GYP. BD.
EXIST CONC. WALL &
OPENING
AL
I
G
N
LINE OF (E) CONC.WALL
BEYOND
TRIM PER MTL PANEL MANUF.
WITH CONT. SEALANT
MIN. CONT. 600T162-54 TOP
TRACK W/ HILTI X-U 0.157 DIA.
W/ 1" MIN EMBEDMENT @ 16"
O.C. (ESR 2269)
A
METAL PANEL AS SPECIFIED
TYVEK COMMERCIAL WRAP
SHEATHING AS SPECIFIED
STUD WALL PER PLAN
METAL PANEL CLOSURE
TRIM WITH DRIP EDGE PER
MANUF. -OVERLAP
WATERPROOF MEMBRANE
AS SHOWN
5/8" GYP. BD.
EXISTING CONC. SLAB
& PAVING
SLOPE 2% -VERIFY
LINE OF (E) CONC.WALL BEYOND
0'
-
6
"
2
3
/
1
6
"
3"
CONC. CURB -PAINT TO
MATCH CONC. WALL
WIDTH OF OPENING - VERIFY
CONT. BOTTOM TRACK
WITH ATTACHMENT &
EMBEDMENT PER
STRUCT.
REBAR & EMBEDMENT
OF DOWELS INTO (E)
CONC. PER STRUCT.
SHIM AS REQUIRED
CONT. BACKER ROD AND
SEALANT
DOOR AS SPECIFIED
INTERIOR
EXTERIOR
C/L
EXISTING CONC. TILT-UP
WALL
MASONRY ANCHOR AS
REQUIRED
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
5
2
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A8.1
DETAILS
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
12" = 1'-0"10INT. PARTITION SCHEDULE
12" = 1'-0"9GYP. BD. FASTENER SCHEDULE
3" = 1'-0"7TYP. INTERIOR DOOR HEAD
3" = 1'-0"6TYP. INTERIOR DOOR JAMB
3" = 1'-0"12TYP. INTERIOR DOOR SILL
3" = 1'-0"4SLIP TRACK
3" = 1'-0"2PARTITION @ ROOF
3" = 1'-0"1PARTITION @ FLOOR
3" = 1'-0"20ASSISTIVE LISTENING SIGNAGE
3" = 1'-0"19MAX OCCUPANCY SIGNAGE
3" = 1'-0"17TACTILE EXIT SIGNAGE
1/2" = 1'-0"16SIGN MOUNTING 12" = 1'-0"11SIGNAGE NOTES
1 1/2" = 1'-0"14INTERIOR ACOUSTIC WINDOW
6" = 1'-0"13ROOFTOP UNIT CURB
3" = 1'-0"18TACTILE EXIT ROUTE SIGNAGE
3" = 1'-0"25EXT. DOOR HEAD (JAMB SIM)
3" = 1'-0"24EXTERIOR DOOR SILL
3" = 1'-0"23EXT. WALL INFILL @ HEAD/JAMB
3" = 1'-0"22EXT. WALL INFILL @ SLAB
3" = 1'-0"21EXT. DOOR HD @ CONC. (JAMB SIM)
A PLAN CHECK CORRECTION 04-08-26
2909 DAIMLER STREET, SANTA ANA, CA 92705
INTERIOR T.I. OF EXISTING CHURCH BUILDING
COMPASS BIBLE CHURCH (TENANT)
DAIMLER COMMERCE PARTNERS, LP
(714) 290 -2593
0
N/A
101126784
101126784 (BUILDING)
20188132 (ELECTRICAL)
40141367 (MECHANICAL)
0
NO IMPACT -IMPROVEMENTS TO PROVIDE FULL DISABLED ACCESS COMPLIANCE WERE ALREADY COMPLETED,
AS PART OF PHASE 1 OF THE PROJECT, UNDER 101109480
NO REQUIRED IMPROVEMENTS -IMPROVEMENTS TO PROVIDE FULL DISABLED ACCESS COMPLIANCE WERE
ALREADY COMPLETED, AS PART OF PHASE 1 OF THE PROJECT, UNDER 101109480
0; IMPROVED TO FULL
COMPLIANCE IN PHASE 1
N/A -NO PUBLIC WAY
1
0; IMPROVED TO FULL
COMPLIANCE IN PHASE 1
0; IMPROVED TO FULL
COMPLIANCE IN PHASE 1
0; IMPROVED TO FULL
COMPLIANCE IN PHASE 1
0; IMPROVED TO FULL
COMPLIANCE IN PHASE 10; IMPROVED TO FULL
COMPLIANCE IN PHASE 10; IMPROVED TO FULL
COMPLIANCE IN PHASE 1
N/A
M. STEVEN CAMP, ELEMENTS ARCHITECTURE
6B LIBERTY, SUITE 100, ALISO VIEJO, CA 92656
949-488-0865
04-08-2026
275,000
$275,000
(INCLUDED)
(INCLUDED)
$275,000
$55,000
A
A
WH
FD
FD
UP UP
UP
UP
UP
(E)
LOBBY
101
(E)
HALLWAY
102
(E)
MEETING
ROOM
103
(E)
MEETING
ROOM
104
(E)
MEETING
ROOM
105
(E)
MEETING
ROOM
106
STORAGE
107
(E) VOID
108
(E)
OFFICE
109
(E) I.T.
ROOM
110
(E)
MEETING
ROOM
111
(E)
LUNCH
ROOM
112
(E)
MEETING
ROOM
113
(E) JAN
114
(E) RR
115
(E) RR
116
NURSERY
117
NURSERY
118
(E)
LOBBY
119
(E)
AUDITORIUM
120
(E)
STORAGE
121
(E)
STORAGE
122
YOUTH
124
STORAGE
125
(E)
YOUTH
126
(E) F.R.
104A
(E)
ELECT
127
HALLWAY
123
C
C
C
C
C
B
B
B
D
123
124A
125
118
117
122
9.029.02
9.029.02
9.029.02
9.03
NOTE -VERIFY EXISTING ADJ. FLOORING
INSTALL PATTERN; ALIGN WITH AND PROVIDE
NEW AT NEW AREA OF HALLWAY
9.029.02
9.14
9.11
9.14
9.11
9.14
9.11
9.13 BEXISTING AREA TO REMAIN
A
124B
DOOR TYPES
TYPE B
PER DOOR SCHEDULE
PE
R
D
O
O
R
S
C
H
E
D
U
L
E
1. ALL NEW DOORS AND FRAMES WITH PAINTED FINISH SHALL BE
PAINTED TO MATCH COLOR & SHEEN OF ADJACENT WALL FINISH
U.N.O. ALL NEW DOORS WITH VENEER SHALL HAVE VENEER TO
MATCH EXISTING ADJACENT DOORS -VERIFY IN FIELD PRIOR TO
BID
2. CHANGES IN LEVEL BETWEEN 1/4 INCH HIGH MINIMUM AND 1/2 INCH
HIGH MAXIMUM SHALL BE BEVELED WITH A SLOPE NOT STEEPER
THAN 1:2 (CBC 11B-303.3)
3. SEE SPECIFICATIONS FOR ALL DOOR HEADINGS
4. ANY/ALL ACCESS CONTROLS SHALL BE COORDINATED WITH OWNER
PRIOR TO BID.
5. EXIT DOORS SHALL ONLY BE EQUIPPED WITH NO-KNOWLEDGE,
SINGLE-ACTION HARDWARE. LOCKS THAT REQUIRE KEYS (SUCH AS
DEAD BOLTS) OR ADDITIONAL ACTIONS TO OPERATE (SUCH AS
MANUAL BOLTS) ARE NOT PERMITTED. CBC 1010.1.9, 1010.1.9.4,
1010.1.9.5
6. OPENING FORCE FOR INTERIOR & EXTERIOR HINGED DOORS SHALL
NOT EXCEED 5 LBS. (15 LBS AT ALL FIRE DOORS).
7. OPERABLE PARTS SHALL BE 34 INCHES MINIMUM AND 44 INCHES
MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. WHERE SLIDING
DOORS ARE IN THE FULLY OPEN POSITION, OPERATING HARDWARE
SHALL BE EXPOSED AND USABLE FROM BOTH SIDES. (CBC
1010.1.9.2 AND 11 B-404.2.7)
8. ALL DOORS WITH LATCH AND LOCK TO HAVE SINGLE ACTION LEVER
HARDWARE WHICH RETRACTS BOTH LOCK AND LATCH FROM THE
EXIT SIDE WITH A SINGLE OPERATION PER CBC 1008.1.9.5.
ALTERNATE: PROVIDE A SIGN PER CBC1008.1.9.3.
9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE
FINAL HARDWARE SPECIFICATIONS WITH ALL EXISTING
CONDITIONS, COMPATIBILITY, DOOR TYPES, STYLES AND FINISHES
PRIOR TO FABRICATION.
10. WHERE EXISTING PRODUCTS WILL BE REUSED, EXAMINE EXISTING
DOOR AND FRAME SIZES, PREPS, SWINGS, RATINGS, AND COMPARE
TO THE SPECIFIED HARDWARE FOR COMPATIBILITY AND
FUNCTIONALITY. THE HARDWARE SET SPECIFIED SHOULD ACT AS
GUIDE FOR DESIGN AND FUNCTION. PROVIDE FILLER PLATES AS
NEEDED TO FILL AND REPAIR EXISTING MATERIALS. TEST ANY
EXISTING TO REMAIN HARDWARE FOR FUNCTIONALITY AND
VISUALLY INSPECT FOR DAMAGE. NOTE ANY DEFECTIVE OR
DAMAGED PRODUCTS AS WELL AS NOTING ANY CODE
DEFICIENCIES AND SUBMIT ISSUES AND ESTIMATED COSTS FOR
DIRECTION OF HOW TO PROCEED WITH REPAIR OR REPLACEMENT.
INTERIOR
TYPE A
PE
R
D
O
O
R
S
C
H
E
D
U
L
E
PER DOOR SCHEDULE
7
A8.1
6
A8.1
12
A8.1
7
A8.1
6
A8.1
12
A8.1
8" X 32" TEMPERED
GLASS VISION LITE,
WHERE NOTED
DOOR NOTES
TYPE C
PER DOOR SCHEDULE
PE
R
D
O
O
R
S
C
H
E
D
U
L
E
25
A8.1
25
A8.1
24
A8.1
EXTERIOR
SIM
21
A8.1 SIM
WALL TYPES
B
(1) LAYER 5/8" GYP. BD.
ACOUSTIC BATT INSULATION FULL-
DEPTH OF STUD
(1) LAYER 5/8" GYP. BD.
6" 20 GA. MTL STUDS PER
SCHEDULE
6"
7
1
/
4
"
D
ACOUSTIC BATT INSULATION FULL-
DEPTH OF STUD
(1) LAYER 5/8" GYP. BD.
6"
7
1
/
4
"
INTERIOR FULL-HEIGHT
INTERIOR OPENING INFILL / PARTIAL-HT
6" 20 GA. MTL STUDS PER
SCHEDULE -VERIFY SIZE IN FIELD
WITH SOFFIT ABOVE
(1) LAYER 5/8" GYP. BD.
3
A5.1
5
A5.1
C
ACOUSTIC BATT INSULATION FULL-
DEPTH OF STUD
(1) LAYER 5/8" GYP. BD.
3
5
/
8
"
4
7
/
8
"
3 5/8" 20 GA. MTL STUDS PER
SCHEDULE
(1) LAYER 5/8" GYP. BD.
4
A5.1
6
3
/
8
"
3
5
/
8
"
3-5/8" 20 GA. MTL. STUD PER SCHEDULE;
FULL-HEIGHT OF OPENING
5/8" EXTERIOR-RATED PLYWD
(1) LAYER 5/8" GYP. BD.
R-13 BATT INSULATION
TYVEK COMMERCIAL WRAP
MTL PNL SIDING
(E) CONC. WALL
EXTERIOR INFILL
A
2
A5.1
SEE FOR GYP. BD. FASTENER
SCHEDULE
SEE FOR INTERIOR
PARTITION SCHEDULE
10
A8.1
9
A8.1
WALL NOTES
FINISH NOTES
1. ALL FINISH MATERIALS, PAINTS, ADHESIVES, SEALANTS AND CAULKS SHALL BE WITHIN VOC LIMITS AS SPECIFIED IN CGBSC TABLES 5.504.4.1 AND 5.504.4.3. SEE SHEET A0.6 FOR MORE INFORMATION.
2. INTERIOR FINISHES, DECORATIVE MATERIALS, AND FURNISHINGS SHALL COMPLY WITH THE CFC
3. THE ENTIRE BUILDING INTERIOR (WITHIN SCOPE OF WORK) IS TO BE PAINTED / RE-PAINTED, INCLUDING ALL EXISTING EXPOSED ELEMENTS SUCH AS PIPES, DUCTWORK, ETC
4. AT OPEN CEILINGS, ALL EXPOSED ELEMENTS SHALL BE PAINTED IN COMPLETE UNLESS NOTED OTHERWISE, INCLUDING DECKING, FRAMING, HARDWARE AND BRACKETS, SCRIM SHEETS AND LINERS,
AND ALL EXPOSED MECHANICAL, ELECTRICAL AND PLUMBING LINES AND COMPONENTS
9.12
9.12
9.11
9.11
9.11
9.119.13
3.01
3.01 9.11
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.14
9.15
EXISTING CONSTRUCTION SHALL REMAIN
LEGEND
PROPOSED CONSTRUCTION;
INTERIOR NON-LOAD-BEARING
FULL-HEIGHT TO UNDERSIDE OF ROOF / FLOOR
PROPOSED CONSTRUCTION:
INTERIOR NON-LOAD-BEARING
OPENING INFILL; PARTIAL-HEIGHT TO UNDERSIDE OF SOFFIT/HEADER
#WALL TAG; REFER TO WALL SCHEDULE
##DOOR TAG; REFER TO DOOR SCHEDULE
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
5
5
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A9.1
DOOR, WALL & FINISH
SCHEDULES
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
1/8" = 1'-0"1FLOOR KEY PLAN
DOOR SCHEDULE
DOOR
NO.TYPE
SIZE DOOR FRAME HARDWARE
REMARKSWI
D
T
H
HE
I
G
H
T
TH
I
C
K
N
E
S
S
MA
T
E
R
I
A
L
FI
N
I
S
H
MA
T
E
R
I
A
L
FI
N
I
S
H
HA
R
D
W
A
R
E
S
E
T
PA
N
I
C
(
Y
/
N
)
CL
O
S
E
R
(
Y
/
N
)
117 B 3' - 0" 8' - 0" 1 3/4" S.C.W. VNR. H.M. PNT. 1 N N PROVIDE VISION LITE PER DOOR TYPE
118 B 3' - 0" 8' - 0" 1 3/4" S.C.W. VNR. H.M. PNT. 1 N N PROVIDE VISION LITE PER DOOR TYPE
122 B 3' - 0" 8' - 0" 1 3/4" S.C.W. PNT. H.M. PNT. 2 N N
123 C 6' - 0" 8' - 0" 1 3/4" S.C.W. PNT. H.M. PNT. 4 N N
124A C 6' - 0" 8' - 0" 1 3/4" S.C.W. VNR. H.M. PNT. 3 Y Y
124B A 6' - 0" 8' - 0" 1 3/4" H.M. PNT. H.M. PNT. 5 Y Y
125 C 6' - 0" 8' - 0" 1 3/4" S.C.W. PNT. H.M. PNT. 4 N N
WALL SCHEDULE
WALL TYPE DESCRIPTION REMARKS
A EXT. MTL PANEL SIDING O/ TYVEK COMMERCIAL WRAP O/ 5/8" EXTERIOR RATED PLYWD SHEATHING O/ 3 5/8" 20 GA. MTL STUDS PER SCHEDULE WITH
R-13 MIN. BATT INSULATION O/ (1) LAYER 5/8" GYP. BD.
EXTERIOR OPENING INFILL
B (1) LAYER 5/8" GYP.BD. O/ 6" 20 GA. MTL. STUDS PER SCHEDULE W/ ACOUS. INSUL. FULL DEPTH OF STUD O/ (1) LAYER 5/8" GYP.BD. FULL-HEIGHT
C (1) LAYER 5/8" GYP.BD. O/ 3-5/8" 20 GA. MTL. STUDS PER SCHEDULE W/ ACOUS. INSUL. FULL DEPTH OF STUD O/ (1) LAYER 5/8" GYP. BD. FULL-HEIGHT
D (1) LAYER 5/8" GYP.BD. O/ 6" 20 GA. MTL. STUDS PER SCHEDULE (VERIFY SIZE OF METAL STUDS IN FIELD WITH SOFFIT FRAMING ABOVE) W/ ACOUS.
INSUL. FULL DEPTH OF STUD O/ (1) LAYER 5/8" GYP.BD.
PARTIAL-HEIGHT TO B.O. SOFFIT (9'-0")
INTERIOR FINISH SCHEDULE
ROOM
NUMBER ROOM NAME FL
O
O
R
BA
S
E
WALLS CEILINGS
REMARKS
NORTH SOUTH EAST WEST
MA
T
E
R
I
A
L
FI
N
I
S
H
HE
I
G
H
T
MA
T
E
R
I
A
L
FI
N
I
S
H
MA
T
E
R
I
A
L
FI
N
I
S
H
MA
T
E
R
I
A
L
FI
N
I
S
H
MA
T
E
R
I
A
L
FI
N
I
S
H
117 NURSERY GYP.BD. GYP.BD. (E) (E) (E) (E) +9'-0"
118 NURSERY GYP.BD. GYP.BD. (E) (E) (E) (E) +9'-0"
123 HALLWAY (E) GYP.BD. GYP.BD. GYP.BD. -- -- OPEN
124 YOUTH (E) (E) (E) GYP.BD. -- OPEN
125 STORAGE (E) GYP.BD. (E) (E) -- -- OPEN
DOOR HARDWARE
SET #01
4 HINGES BB1279 4 1/2 X 4 1/2 NRP US26D HA
1 CLASSROOM LOCK 3470 ARC SFIC US26D HA
1 SFIC CORE 3969 US26D HA
1 OVERHEAD HOLDER 7017 SRF US32D HA
3 DOOR SILENCERS 307D/308D (AS REQUIRED) GREY HA
SET #02
1 CONTINUOUS HINGE 780-224HD X LAR CLR HA
1 CLASSROOM LOCK 3470 ARC SFIC US26D HA
1 SFIC CORE 3969 US26D HA
1 KICK PLATE 190S 10" X 2" LDW CSK US32D HA
SET #03
2 CONTINUOUS HINGES 780-224HD X LAR CLR HA
2 EXIT DEVICES 4501 CVR US32D HA
1 EXIT DEVICE TRIM 45CE ARC US26D HA
1 SFIC MORTISE CYLINDER HOUSING 3902 SFIC X LAR US26D HA
1 SFIC CORE 3969 US26D HA
2 CLOSERS 5100 HDHOCS ALM HA
2 KICK PLATES 190S 10" X 1" LDW CSK US32D HA
2 DOOR SILENCERS 307D/308D (AS REQUIRED)GREY HA
ARCHITECTURAL KEYNOTES
## DESCRIPTION
3.01 SEALED CONCRETE
9.02 NOTE - AT OPPOSITE SIDE OF WALL, WITHIN ALL AREAS OF WORK, PATCH/REPAIR EXISTING FLOORING TO REMAIN, PAINT NEW WALL & PROVIDE WALL BASE TO MATCH ADJACENT WALLS
9.03 NOTE - PROVIDE NEW DOOR THRESHOLDS AND/OR TRANSITIONS AT ALL NEW FLOOR FINISH INSTALLATIONS, TYP.
9.11 RUBBER WALL BASE, MANUF: MANNINGTON BURKE, PRODUCT: 2 1/2" HIGH RUBBER MYTE TP (STRAIGHT AT CARPET, COVED AT RESILIENT/CONCRETE), COLOR: ROCKY 66O
9.12 TEXTILE COMPOSITE; MFR.: EF CONTRACT, STYLE NO.: SIROCCO, COLOR/PATTERN: FRESH AIR SRC44, SIZE: 12" x 48", INSTALLATION: HERRINGBONE
9.13 LVT; MFR.: PATCRAFT, STYLE NO.: REMOVE I417V, COLOR/PATTERN: TAUPE STONE 00770, SIZE: 12" x 24", INSTALLATION: MONOLITHIC
9.14 MAIN WALL PAINT PER SPECIFICATIONS; MANUF: SHERWIN WILLIAMS, COLOR: SW7044 AMAZING GRAY
9.15 PAINT AT EXPOSED STRUCTURE; MANUF: SHERWIN WILLIAMS, COLOR: SW7048 URBANE BRONZE
PROJECT
NORTH
SET #04
2 CONTINUOUS HINGES 780-224HD X LAR CLR HA
1 STOREROOM LOCK 3480 ARC SFIC US26D HA
1 SFIC CORE 3969 US26D HA
2 KICK PLATES 190S 10" X 1" LDW CSK US32D HA
2 DOOR SILENCERS 307D/308D (AS REQUIRED)GREY HA
SET #05
2 CONTINUOUS HINGES 780-224HD X LAR CLR HA
2 EXIT DEVICES 4501 CVR US32D HA
2 CLOSERS 5100 HDHOCS ALM HA
2 KICK PLATES 190S 10" X 1" LDW CSK US32D HA
1 THRESHOLD 520S S X LAR MIL HA
2 DOOR SWEEPS 750S S X LAR CLR HA
1 SET WEATHERSTRIP 881S S X LAR MIL HA
2 MEETING STILE ASTRAGALS 802S B X LAR MIL HA
1 STICK-ON ASTRAGAL SEAL 739C X LAR CLEAR HA
1 RAIN DRIP CAP 810S X LAR MIL HA
A. ADMINISTRATION OF CONTRACT: PROVIDE ADMINISTRATIVE REQUIREMENTS FOR THE PROPER
COORDINATION AND COMPLETION OF WORK INCLUDING THE FOLLOWING:
1. SUPERVISORY PERSONNEL.
2. PRECONSTRUCTION CONFERENCE.
3. PROJECT MEETINGS
B. SUBMITTAL SCHEDULE: PREPARE SUBMITTAL SCHEDULE; COORDINATE WITH PROGRESS
SCHEDULE.
C. SCHEDULE OF VALUES: SUBMIT SCHEDULE OF VALUES.
D. SCHEDULE OF TESTS: SUBMIT SCHEDULE OF REQUIRED TESTS INCLUDING PAYMENT AND
RESPONSIBILITY.
E. PERFORM SURVEYS: LAY OUT THE WORK AND VERIFYING LOCATIONS DURING
CONSTRUCTION. PERFORM FINAL SITE SURVEY.
F. EMERGENCY CONTACTS: SUBMIT AND POST A LIST OF EMERGENCY TELEPHONE NUMBERS
AND ADDRESS FOR INDIVIDUALS TO BE CONTACTED IN CASE OF EMERGENCY.
G. RECORD DOCUMENTS: SUBMIT RECORD DRAWINGS AND SPECIFICATIONS; TO BE
MAINTAINED AND ANNOTATED BY CONTRACTOR AS WORK PROGRESSES.
H. TYPES OF SUBMITTALS: PROVIDE TYPES OF SUBMITTALS LISTED IN INDIVIDUAL SECTIONS AND
NUMBER OF COPIES REQUIRED BELOW.
1. SHOP DRAWINGS, REVIEWED AND ANNOTATED BY THE CONTRACTOR - 2 COPIES.
2. PRODUCT DATA - 2 COPIES.
3. SAMPLES - 2, PLUS EXTRA SAMPLES AS REQUIRED TO INDICATE RANGE OF COLOR,
FINISH, AND TEXTURE TO BE EXPECTED.
4. INSPECTION AND TEST REPORTS - 2 COPIES.
5. WARRANTIES - 2 COPIES.
6. SURVEY DATA - 2 COPIES.
7. CLOSEOUT SUBMITTALS - 2 COPIES.
8. PROJECT PHOTOGRAPHS - 12 DIGITAL IMAGES EACH MONTH. SUBMIT CUMULATIVE
COPY AT EACH SUBSEQUENT SUBMITTAL.
I. SUBMITTAL PROCEDURES: COMPLY WITH PROJECT FORMAT FOR SUBMITTALS. COMPLY WITH
SUBMITTAL PROCEDURES ESTABLISHED BY ARCHITECT INCLUDING ARCHITECT'S SUBMITTAL AND
SHOP DRAWING STAMP. PROVIDE REQUIRED RESUBMITTALS IF ORIGINAL SUBMITTALS ARE NOT
APPROVED. PROVIDE DISTRIBUTION OF APPROVED COPIES INCLUDING MODIFICATIONS AFTER
SUBMITTALS HAVE BEEN APPROVED.
J. SAMPLES AND SHOP DRAWINGS: SAMPLES AND SHOP DRAWINGS SHALL BE PREPARED
SPECIFICALLY FOR THIS PROJECT. SHOP DRAWINGS SHALL INCLUDE DIMENSIONS AND DETAILS,
INCLUDING ADJACENT CONSTRUCTION AND RELATED WORK. NOTE SPECIAL COORDINATION
REQUIRED. NOTE ANY DEVIATIONS FROM REQUIREMENTS OF THE CONTRACT DOCUMENTS.
K. WARRANTIES: PROVIDE WARRANTIES AS SPECIFIED; WARRANTIES SHALL NOT LIMIT LENGTH OF
TIME FOR REMEDY OF DAMAGES OWNER MAY HAVE BY LEGAL STATUTE. CONTRACTOR,
SUPPLIER OR INSTALLER RESPONSIBLE FOR PERFORMANCE OF WARRANTY SHALL SIGN
WARRANTIES.
L. QUALITY MONITORING: MONITOR QUALITY CONTROL OVER SUPPLIERS, MANUFACTURERS,
PRODUCTS, SERVICES, SITE CONDITIONS, AND WORKMANSHIP, TO PRODUCE WORK OF
SPECIFIED QUALITY. PERFORM QUALITY CONTROL PROCEDURES AND INSPECTIONS DURING
INSTALLATION.
M. STANDARDS: COMPLY WITH SPECIFIED STANDARDS AS MINIMUM QUALITY FOR THE WORK
EXCEPT WHERE MORE STRINGENT TOLERANCES, CODES, OR SPECIFIED REQUIREMENTS
INDICATE HIGHER STANDARDS OR MORE PRECISE WORKMANSHIP.
N. TOLERANCES: MONITOR FABRICATION AND INSTALLATION TOLERANCE CONTROL OF
PRODUCTS TO PRODUCE ACCEPTABLE WORK. DO NOT PERMIT TOLERANCES TO
ACCUMULATE. COMPLY WITH MANUFACTURER'S TOLERANCES.
O. REFERENCE STANDARDS: FOR PRODUCTS OR WORKMANSHIP SPECIFIED BY ASSOCIATION,
TRADE, OR OTHER CONSENSUS STANDARDS, COMPLY WITH REQUIREMENTS OF THE
STANDARD, EXCEPT WHEN MORE RIGID REQUIREMENTS ARE SPECIFIED OR ARE REQUIRED BY
APPLICABLE CODES.
P. MANUFACTURER'S FIELD SERVICES: WHEN SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS,
REQUIRE MATERIAL OR PRODUCT SUPPLIERS OR MANUFACTURERS TO PROVIDE QUALIFIED
STAFF PERSONNEL TO PERFORM THE FOLLOWING AS APPLICABLE, AND TO INITIATE
INSTRUCTIONS WHEN NECESSARY.
1. OBSERVE SITE CONDITIONS.
2. CONDITIONS OF SURFACES AND INSTALLATION.
3. QUALITY OF WORKMANSHIP.
4. START-UP OF EQUIPMENT.
5. TEST, ADJUST AND BALANCE OF EQUIPMENT.
Q. MOCK-UPS: ASSEMBLE AND ERECT SPECIFIED ITEMS WITH SPECIFIED ATTACHMENT AND
ANCHORAGE DEVICES, FLASHINGS, SEALS, AND FINISHES. ACCEPTED MOCK-UPS SHALL BE A
COMPARISON STANDARD FOR THE REMAINING WORK.
R. REMOVAL OF MOCK-UPS: WHERE MOCK-UP HAS BEEN ACCEPTED BY ARCHITECT AND NO
LONGER NEEDED, REMOVE MOCK-UP AND CLEAR AREA WHEN DIRECTED TO DO SO.
S. MANUFACTURES: PROVIDE PRODUCTS FROM ONE MANUFACTURER FOR EACH TYPE OR KIND
AS APPLICABLE. PROVIDE SECONDARY MATERIALS AS ACCEPTABLE TO MANUFACTURERS OF
PRIMARY MATERIALS.
T. PRODUCT SELECTION: PROVIDE PRODUCTS SELECTED OR EQUAL APPROVED BY ARCHITECT.
PRODUCTS SUBMITTED FOR SUBSTITUTION SHALL BE SUBMITTED WITH COMPLETE
DOCUMENTATION, AND INCLUDE CONSTRUCTION COSTS OF SUBSTITUTION INCLUDING
RELATED WORK.
U.SUBSTITUTIONS: REQUEST FOR SUBSTITUTION MUST BE IN WRITING. CONDITIONS FOR
SUBSTITUTION INCLUDE:
1.AN 'OR EQUAL' PHRASE IN THE SPECIFICATIONS.
2.SPECIFIED MATERIAL CANNOT BE COORDINATED WITH OTHER WORK.
3.SPECIFIED MATERIAL IS NOT ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.
4.SUBSTANTIAL ADVANTAGE IS OFFERED TO THE OWNER IN TERMS OF COST, TIME,
OR OTHER VALUABLE CONSIDERATION.
V.SUBSTITUTION REQUESTS: SUBSTITUTIONS SHALL BE SUBMITTED PRIOR TO AWARD OF
CONTRACT, UNLESS OTHERWISE ACCEPTABLE. APPROVAL OF SHOP DRAWINGS, PRODUCT
DATA, OR SAMPLES CONTAINING SUBSTITUTIONS IS NOT AN APPROVAL OF A
SUBSTITUTION UNLESS AN ITEM IS CLEARLY PRESENTED AS A SUBSTITUTION AT THE TIME OF
SUBMITTAL.
W. SUBSTANTIAL COMPLETION: THE FOLLOWING ARE PREREQUISITES TO SUBSTANTIAL
COMPLETION. PROVIDE THE FOLLOWING.
1. PUNCH LIST PREPARED BY CONTRACTOR AND SUBCONTRACTORS AS APPLICABLE.
2. SUPPORTING DOCUMENTATION.
3. WARRANTIES.
4. CERTIFICATIONS.
5. OCCUPANCY PERMIT.
6. START-UP AND TESTING OF BUILDING SYSTEMS.
7. CHANGE OVER OF LOCKS.
8. METER READINGS.
9. COMMISSIONING DOCUMENTATION.
X. FINAL ACCEPTANCE: PROVIDE THE FOLLOWING PREREQUISITES TO FINAL ACCEPTANCE.
1. FINAL PAYMENT REQUEST WITH SUPPORTING AFFIDAVITS.
2. COMPLETED PUNCH LIST.
Y. AS-BUILT DRAWINGS: PROVIDE A MARKED-UP SET OF DRAWINGS INCLUDING CHANGES,
WHICH OCCURRED DURING CONSTRUCTION.
Z. PROJECT CLOSEOUT: PROVIDE THE FOLLOWING DURING PROJECT CLOSEOUT.
1. SUBMISSION OF RECORD DOCUMENTS.
2. SUBMISSION OF MAINTENANCE MANUALS.
3. TRAINING AND TURNOVER TO OWNER'S PERSONNEL.
4. FINAL CLEANING AND TOUCH-UP.
5. REMOVAL OF TEMPORARY FACILITIES.
AA. CUTTING AND PATCHING: PROVIDE CUTTING AND PATCHING WORK TO PROPERLY COMPLETE
THE WORK OF THE PROJECT, COMPLYING WITH PROJECT REQUIREMENTS FOR:
1. STRUCTURAL WORK.
2. MECHANICAL/ELECTRICAL SYSTEMS.
3. VISUAL REQUIREMENTS, INCLUDING DETAILING AND TOLERANCES.
4. OPERATIONAL AND SAFETY LIMITATIONS.
5. FIRE RESISTANCE RATINGS.
6. INSPECTION, PREPARATION, AND PERFORMANCE.
7. CLEANING.
BB. MEANS AND METHODS: DO NOT CUT AND PATCH IN A MANNER THAT WOULD RESULT IN A
FAILURE OF THE WORK TO PERFORM AS INTENDED, DECREASE ENERGY PERFORMANCE,
INCREASE MAINTENANCE, DECREASE OPERATIONAL LIFE, OR DECREASE SAFETY PERFORMANCE.
CC. INSPECTION: INSPECT CONDITIONS PRIOR TO WORK TO IDENTIFY SCOPE AND TYPE OF
WORK REQUIRED. PROTECT ADJACENT WORK. NOTIFY OWNER OF WORK REQUIRING
INTERRUPTION TO BUILDING SERVICES OR OWNER'S OPERATIONS.
DD. PERFORMANCE OF OPERATIONS: PERFORM WORK WITH WORKMEN SKILLED IN THE TRADES
INVOLVED. PREPARE SAMPLE AREA OF EACH TYPE OF WORK FOR APPROVAL.
EE. CUTTING: USE CUTTING TOOLS, NOT CHOPPING TOOLS. MAKE NEAT HOLES. MINIMIZE
DAMAGE TO ADJACENT WORK. INSPECT FOR CONCEALED UTILITIES AND STRUCTURE BEFORE
CUTTING.
FF. PATCHING: MAKE PATCHES, SEAMS, AND JOINTS DURABLE AND INCONSPICUOUS. COMPLY
WITH TOLERANCES FOR NEW WORK.
GG.CLEANING: CLEAN WORK AREA AND AREAS AFFECTED BY CUTTING AND PATCHING
OPERATIONS.
HH. CODES AND REGULATIONS: COMPLY WITH GOVERNING CODES AND REGULATIONS. USE
EXPERIENCED WORKERS.
II. OCCUPANCY: IMMEDIATE AREAS OF WORK WILL NOT BE OCCUPIED DURING SELECTIVE
DEMOLITION. THE PUBLIC, INCLUDING CHILDREN, MAY OCCUPY ADJACENT AREAS.
JJ. EXISTING CONDITIONS: NO RESPONSIBILITY FOR BUILDINGS AND STRUCTURES TO BE
DEMOLISHED WILL BE ASSUMED BY THE OWNER.
KK. STRUCTURE DEMOLITION:
1. APPLICATION: SALVAGE OF DESIGNATED ITEMS.
2. APPLICATION: PROTECTION OF SITE WORK AND ADJACENT STRUCTURES.
3. APPLICATION: DISCONNECTION, CAPPING, AND REMOVAL OF UTILITIES - IF/AS
REQUIRED
4. APPLICATION: POLLUTION CONTROL DURING BUILDING DEMOLITION, INCLUDING
NOISE CONTROL.
5. APPLICATION: REMOVAL AND LEGAL DISPOSAL OF MATERIALS.
6. PROTECTION: DESIGNATED SITE IMPROVEMENTS AND ADJACENT CONSTRUCTION.
7. SALVAGE: DESIGNATED ITEMS.
8. HAZARDOUS MATERIALS: NOT PRESENT.
1.0 GENERAL CONDITIONS LL. DEMOLITION OPERATIONS: DO NOT DAMAGE BUILDING ELEMENTS AND IMPROVEMENTS
INDICATED TO REMAIN. ITEMS OF SALVAGE VALUE, NOT INCLUDED ON SCHEDULE OF
SALVAGE ITEMS TO BE RETURNED TO OWNER, SHALL BE REMOVED FROM STRUCTURE.
STORAGE OR SALE OF ITEMS AT PROJECT SITE IS PROHIBITED.
MM.UTILITIES: LOCATE, IDENTIFY, DISCONNECT, AND SEAL OR CAP OFF UTILITIES IN BUILDINGS TO
BE DEMOLISHED.
NN. SHORING AND BRACING: PROVIDE AND MAINTAIN INTERIOR AND EXTERIOR SHORING AND
BRACING.
OO. OCCUPIED SPACES: DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, DRIVES OR OTHER
OCCUPIED OR USED SPACES OR FACILITIES WITHOUT THE WRITTEN PERMISSION OF THE
OWNER AND THE AUTHORITIES HAVING JURISDICTION. DO NOT INTERRUPT UTILITIES SERVING
OCCUPIED OR USED FACILITIES WITHOUT THE WRITTEN PERMISSION OF THE OWNER AND
AUTHORITIES HAVING JURISDICTION. IF NECESSARY, PROVIDE TEMPORARY UTILITIES.
PP. OPERATIONS: CEASE OPERATIONS IF PUBLIC SAFETY OR REMAINING STRUCTURES ARE
ENDANGERED. PERFORM TEMPORARY CORRECTIVE MEASURES UNTIL OPERATIONS CAN BE
CONTINUED PROPERLY.
QQ. SECURITY: PROVIDE ADEQUATE PROTECTION AGAINST ACCIDENTAL TRESPASSING. SECURE
PROJECT AFTER WORK HOURS.
RR. RESTORATION: RESTORE FINISHES OF PATCHED AREAS.
5.0 METALS
7.2 BLANKET/BATT INSULATION
1. MANUFACTURER: AS SELECTED BY CONTRACTOR
2. APPLICATION: THERMAL INSULATION IN STUDS IN EXTERIOR WALLS.
3. APPLICATION: THERMAL INSULATION AT UNDERSIDE OF ROOFS, OVER HEATED
SPACES AND SOFFITS.
4. TYPE: FOIL-FACED MINERAL FIBER.
a. STANDARD: ASTM C 665, TYPE III (FOIL-SCRIM-KRAFT VAPOR-RETARDER
MEMBRANE).
b. ACCESSORIES: FASTENERS AND TAPES.
7.0 THERMAL AND MOISTURE PROTECTION
A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
B. SUBMIT FOR APPROVAL TEST REPORTS.
C. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
A SUMMARY: PROVIDE JOINT SEALERS AND FILLERS.
B PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
C. SAMPLES: SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH MATERIAL SPECIFIED
INDICATING VISUAL CHARACTERISTICS AND FINISH. INCLUDE RANGE SAMPLES IF
VARIATION OF FINISH IS ANTICIPATED.
1. INCLUDE MANUFACTURERS FULL RANGE OF COLOR AND FINISH OPTIONS IF
ADDITIONAL SELECTION IS REQUIRED.
D QUALITY ASSURANCE: COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE
PRODUCTS OF ACCEPTABLE MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN
SIMILAR SERVICE FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND
STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
E.MATERIALS
A. EXTERIOR JOINTS IN VERTICAL SURFACES: TWO COMPONENT SILICONE ,TWO-
COMPONENT URETHANE SEALANT.
C. EXTERIOR JOINTS IN VERTICAL SURFACES, PREFORMED COMPRESSION SEALS:
PREFORMED PRECOMPRESSED FOAM SEALANT.
D. EXTERIOR JOINTS IN HORIZONTAL SURFACES, URETHANE:
SELF-LEVELING URETHANE SEALANT, ASTM C 920.
F. EXTERIOR PAVING JOINT FILLERS, BITUMINOUS:
BITUMINOUS FIBER.
G. INTERIOR JOINTS, LIMITED MOVEMENT, ACRYLIC:
ACRYLIC-EMULSION, ASTM C 834.
H. INTERIOR JOINTS, SANITARY SILICONE:
ONE-PART MILDEW-RESISTANT SILICONE SEALANT, ASTM C 920.
F INSTALLATION
A. EXAMINE SUBSTRATE; REPORT UNSATISFACTORY CONDITIONS IN WRITING.
BEGINNING WORK MEANS ACCEPTANCE OF SUBSTRATES.
B. PROVIDE SEALANTS IN COLORS AS SELECTED FROM MANUFACTURER'S STANDARDS.
C. INSTALL MATERIALS AND SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS AND APPROVED SUBMITTALS. INSTALL MATERIALS AND SYSTEMS IN
PROPER RELATION WITH ADJACENT CONSTRUCTION AND WITH UNIFORM
APPEARANCE. COORDINATE WITH WORK OF OTHER SECTIONS. CLEAN AND
PRIME JOINTS, AND INSTALL BOND BREAKERS, BACKER RODS AND SEALANT AS
RECOMMENDED BY MANUFACTURERS.
D. DEPTH SHALL EQUAL WIDTH UP TO 1/2 INCH WIDE; DEPTH SHALL EQUAL 1/2
WIDTH FOR JOINTS OVER 1/2 INCH WIDE.
E. CURE AND PROTECT SEALANTS AS DIRECTED BY MANUFACTURERS. REPLACE OR
RESTORE DAMAGED SEALANTS. CLEAN ADJACENT SURFACES TO REMOVE
SPILLAGE.
7.1 JOINT SEALANT
A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
B. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS INDICATING MATERIAL CHARACTERISTICS, DETAILS
OF CONSTRUCTION, CONNECTIONS, AND RELATIONSHIP WITH ADJACENT CONSTRUCTION.
C. SAMPLES: SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH MATERIAL SPECIFIED INDICATING
VISUAL CHARACTERISTICS AND FINISH. INCLUDE RANGE SAMPLES IF VARIATION OF FINISH IS
ANTICIPATED.
D. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
E. FLASHING AND SHEET METAL:
1. MANUFACTURERS: AS SELECTED BY CONTRACTOR
2. APPLICATION: METAL COUNTERFLASHING AND BASE FLASHING.
3. APPLICATION: EXTERIOR WALL FLASHING.
4. APPLICATION: EXTERIOR ROOF-MOUNTED MECHANICAL & PLUMBING ELEMENTS
5. APPLICATION: EXPOSED METAL TRIM AND FASCIA UNITS.
6. FLEXIBLE SHEET MEMBRANE FLASHING: NONREINFORCED FLEXIBLE BLACK ELASTIC
SHEET, 50 TO 65 MILS THICK, SYNTHETIC RUBBER- VERIFY IN FIELD WITH EXISTING
ROOFING SYSTEM'S MANUFACTURER AND WARRANTY
7. METAL WALL PANEL TRIM & FLASHING PER MANUFACTURER'S STANDARDS & SMACNA
7.3 FLASHING AND SHEET METAL
8.1 DOOR HARDWARE
A. SUBMITTALS: SUBMIT IN ACCORDANCE WITH CONDITIONS OF THE CONTRACT AND DIVISION 01
B. SHOP DRAWINGS: SCHEDULE HARDWARE IN VERTICAL FORMAT USING THE DHI PUBLICATION
SEQUENCE AND FORMATTING FOR THE HARDWARE SCHEDULE. INCLUDE ABBREVIATIONS AND
SYMBOLS PAGE TO INCLUDE MANUFACTURERS’ ABBREVIATIONS, FINISH CODE DESCRIPTIONS, AND
FASTENER ABBREVIATIONS INCLUDING DESCRIPTIONS ACCORDING TO THE DHI PUBLICATION
ABBREVIATIONS AND SYMBOLS. DETAIL HEADINGS REFERENCING THE ARCHITECT’S HEADING,
OPENING NUMBER, LOCATIONS, FIRE RATING, HANDING, DEGREE OF OPENING, AND
DESCRIPTION OF THE OPENING ELEMENTS. INCLUDE VOLTAGE, AMPERAGE, AND OPERATIONAL
DESCRIPTIONS FOR OPENINGS THAT HAVE ELECTRIFIED HARDWARE.COORDINATE FINAL DOOR
HARDWARE SCHEDULE WITH DOORS, FRAMES, AND RELATED WORK LISTING PROPER SIZING OF
HARDWARE, ADDRESSING DOOR THICKNESS, HANDING, FUNCTION, MOUNTING ACCESSORIES,
AND FINISH OF HARDWARE. LIST RELATED DOOR DEVICES SPECIFIED IN OTHER SECTIONS FOR
EACH OPENING. ARCHITECTURAL HARDWARE CONSULTANT (AHC), AS CERTIFIED BY DHI, WHO WILL
AFFIX SEAL ATTESTING TO COMPLETENESS AND CORRECTNESS, INCLUDING THE REVIEW OF THE
HARDWARE SCHEDULE PRIOR TO SUBMITTAL.
C. PRODUCT DATA: FURNISH MANUFACTURERS’ CATALOG SHEETS ON DESIGN, GRADE, AND
FUNCTION OF ITEMS LISTED IN HARDWARE SCHEDULE. SUBMIT ONLY RELEVANT INFORMATION
AND CIRCLE OR HIGHLIGHT THE TECHNICAL INFORMATION INCLUDING: MODEL NUMBERS, SIZING
INFORMATION, VOLTAGE AND AMPERAGE REQUIREMENTS, OPTIONS AND ACCESSORIES
REQUIRED, MEANS OF FASTENING, LISTINGS OF FIRE-RATED APPLICATIONS, AND FINISHES.
E. TEMPLATES:WITHIN FOURTEEN DAYS OF RECEIVING APPROVED DOOR HARDWARE SUBMITTALS
SUBMIT COMPLETE LIST OF TEMPLATES FOR EACH HARDWARE ITEM TO THE OPENING
MANUFACTURERS AND THE INSTALLERS. INCLUDE DETAILED LISTS OF THE HARDWARE LOCATION
REQUIREMENTS FOR MORTISED AND SURFACE APPLIED HARDWARE.
F. CLOSEOUT SUBMITTALS: INCLUDE THE FOLLOWING INFORMATION AS WELL AS HIGHLIGHT AND
FLAG FIRE RATED OPENINGS FOR ANNUAL INSPECTIONS:
COVER PAGE WITH REQUIRED INFORMATION:
A.PROJECT NAME
B.HARDWARE SUPPLIER’S NAME AND CONTACT INFORMATION.
C. DATE OF SUBSTANTIAL COMPLETION.
2.FINAL RECORD HARDWARE SCHEDULE.
3.PRODUCT DATA.
4.KEYING SCHEDULE.
5.OPERATING AND MAINTENANCE MANUAL.
6.WARRANTY INFORMATION.
G. HARDWARE SUPPLIER SHALL EMPLOY AN ARCHITECTURAL HARDWARE CONSULTANT (AHC) AS
CERTIFIED BY DHI AND A MEMBER OF THE SEAL PROGRAM WHO WILL BE AVAILABLE AT REASONABLE
TIMES DURING COURSE OF WORK FOR PROJECT HARDWARE CONSULTATION.
H.WHERE OPENINGS ARE REQUIRED TO BE ACCESSIBLE DOOR HARDWARE SHALL CONFORM TO
ICC/ANSI A117.1.
I. DOOR HARDWARE CERTIFIED TO ANSI/BHMA STANDARDS AS NOTED, MANUFACTURER MUST
PARTICIPATE AND BE LISTED IN BHMA CERTIFIED PRODUCTS DIRECTORY.
J. INSTALLER QUALIFICATIONS: SPECIALIZED IN PERFORMING INSTALLATION OF THIS SECTION AND
HAVE FIVE YEARS MINIMUM DOCUMENTED EXPERIENCE.
K. DELIVERY, STORAGE, AND HANDLING: PACK EACH ITEM COMPLETE WITH NECESSARY PARTS AND
FASTENERS IN MANUFACTURER’S ORIGINAL PACKAGING. MARK HARDWARE THAT IS NOT BULK
PACKED WITH ARCHITECT’S OPENING NUMBER, HARDWARE SET NUMBER, AND ITEM NUMBER FOR
EACH TYPE OF HARDWARE. INCLUDE KEYSET SYMBOLS AND CORRESPONDING HARDWARE
COMPONENT FOR KEYED PRODUCTS. MARK HARDWARE THAT IS BULK PACKED WITH
MANUFACTURERS’ PART NUMBER AND REFERENCE ALL HARDWARE SETS ASSOCIATED. DELIVER
HARDWARE TO THE JOB SITE ACCORDING TO THE PHASING AGREED UPON IN THE PRE-
INSTALLATION MEETING. INVENTORY THE DELIVERY WITH THE SUPPLIER’S ASSISTANCE.
IMMEDIATELY NOTE SHORTAGES AND DAMAGES ON THE SHIPPING RECEIPTS AND BILL OF LADINGS.
COORDINATE REPLACEMENT OR REPAIR WITH THE SUPPLIER. DELIVER PERMANENT KEYS, CORES,
AND RELATED ACCESSORIES DIRECTLY TO OWNER VIA REGISTERED MAIL OR OVERNIGHT PACKAGE
SERVICE. ESTABLISH THE INSTRUCTIONS FOR DELIVERY TO OWNER AT “KEYING CONFERENCE.”
PROVIDE A CLEAN, DRY, AND SECURE ROOM FOR HARDWARE DELIVERED. SHELVE HARDWARE OFF
THE FLOOR AND WITH LARGER ITEMS OF HARDWARE STORED ON PALLETS. ARRANGE LOCKSETS
AND KEYED CYLINDERS BY OPENING NUMBER. ORGANIZE THE BALANCE OF HARDWARE BY BRAND,
MODEL OF HARDWARE, AND HARDWARE SET NUMBER. LEAVE THE DOOR MARKINGS OF THE
HARDWARE VISIBLE FOR INSTALLERS.
L. WARRANTY:
1.TEN YEARS FOR MANUAL DOOR CLOSERS.
2.FIVE YEARS FOR LOCKS.
3.FIVE YEARS FOR EXIT DEVICES.
M. MAINTENANCE: MAINTENANCE TOOL AND INSTRUCTIONS: FURNISH A COMPLETE SET OF
SPECIALIZED TOOLS AND MAINTENANCE INSTRUCTIONS FOR OWNER’S CONTINUED ADJUSTMENT,
MAINTENANCE, REMOVAL, AND REPLACEMENT OF DOOR HARDWARE.
N. MATERIALS: PRODUCE HARDWARE UNITS OF BASIC METAL AND FORMING METHOD USING
MANUFACTURER'S STANDARD METAL ALLOY, COMPOSITION, TEMPER, AND HARDNESS, BUT IN NO
CASE OF LESSER (COMMERCIALLY RECOGNIZED) QUALITY THAN SPECIFIED WITHIN THIS
SPECIFICATION SECTION FOR APPLICABLE HARDWARE UNITS FOR FINISH DESIGNATIONS
INDICATED.
O: FASTENERS: FURNISH SCREWS FOR INSTALLATION WITH EACH HARDWARE ITEM. USE ONLY
FASTENERS THAT ARE FURNISHED BY THE HARDWARE MANUFACTURER TO MEET THE
MANUFACTURER’S TEMPLATING REQUIREMENTS, WARRANTY AND NFPA 80 REQUIREMENTS.PROVIDE
PHILLIPS FLAT-HEAD SCREWS EXCEPT AS OTHERWISE INDICATED.FINISH EXPOSED SCREWS TO MATCH
HARDWARE FINISH OR, IF EXPOSED IN SURFACES OF OTHER WORK, TO MATCH FINISH OF THIS
OTHER WORK AS CLOSELY AS POSSIBLE INCLUDING "PREPARED FOR PAINT" SURFACES TO RECEIVE
PAINTED FINISH. USE MACHINE SCREWS WITH LEAD EXPANSION SHIELDS AT HARDWARE
MOUNTING TO MASONRY WALLS AND FLOORS.WOOD SCREW WITH PLASTIC ANCHORS AT
DRYWALL APPLICATIONS WITHOUT REINFORCEMENT AND WOOD SCREWS AT APPLICATIONS WITH
REINFORCEMENTS.PROVIDE CONCEALED FASTENERS FOR HARDWARE UNITS THAT ARE EXPOSED
WHEN DOOR IS CLOSED EXCEPT TO THE EXTENT NO STANDARD UNITS OF TYPE SPECIFIED ARE
AVAILABLE WITH CONCEALED FASTENERS. DO NOT USE THRU-BOLTS FOR INSTALLATION WHERE
BOLT HEAD OR NUT ON OPPOSITE FACE IS EXPOSED IN OTHER WORK UNLESS THEIR USE IS THE
ONLY MEANS OF REINFORCING THE WORK ADEQUATELY TO FASTEN THE HARDWARE
SECURELY.WHERE THRU-BOLTS ARE USED AS A MEANS OF REINFORCING THE WORK, PROVIDE
SLEEVES FOR EACH THRU-BOLT OR USE SEX NUT FASTENERS. AT EXTERIOR OPENINGS FURNISH
STAINLESS-STEEL FASTENERS FOR EXPOSED FASTENERS, FOR EXAMPLE THRESHOLDS AND SCREW-
APPLIED WEATHERSTRIPPING.
X. PROTECTIVE TRIM: PROTECTIVE TRIM OF ONE MANUFACTURER AS LISTED FOR CONTINUITY
OF DESIGN AND CONSIDERATION OF WARRANTY.
A.SIZE OF PROTECTION PLATE: SINGLE DOORS, SIZE TWO INCHES LESS DOOR WIDTH (LDW)
ON PUSH SIDE OF DOOR, AND ONE INCH LESS DOOR WIDTH ON PULL SIDE OF DOOR. FOR
PAIRS OF DOORS, SIZE ONE INCH LESS DOOR WIDTH (LDW) ON PUSH SIDE OF DOOR, AND 1/2
INCH ON PULL SIDE OF DOOR. ADJUST SIZES TO ACCOMMODATE ACCOMPANYING
HARDWARE, SUCH AS, EDGE GUARDS, ASTRAGALS, AND OTHERS.
1. KICK PLATES 10” HIGH OR SIZED TO DOOR BOTTOM RAIL HEIGHT.
2. MOP PLATES 4” HIGH.
3. ARMOR PLATES 36” HIGH.
B.PRODUCTS TO BE CERTIFIED AND LISTED BY THE FOLLOWING:
1. ARCHITECTURAL DOOR TRIM: ANSI/BHMA A156.6.
2. UL.
C. MATERIAL AND DESIGN:
1. 0.050” GAGE STAINLESS STEEL.
2. CORNERS SQUARE, POLISHING LINES, OR DOMINANT DIRECTION OF SURFACE PATTERN
SO THEY RUN ACROSS DOOR WIDTH OF PLATE.
3. BEVEL TOP, BOTTOM, AND SIDES UNIFORMLY LEAVING NO SHARP EDGES.
4. COUNTERSINK HOLES FOR SCREWS. SPACE SCREW HOLES SO THEY ARE NO MORE
THAN EIGHT INCHES CTC, ALONG A CENTERLINE NOT OVER 1/2” IN FROM EDGE
AROUND PLATE. END SCREWS MAXIMUM OF 0.53” FROM CORNERS.
D.UL LABEL STAMP REQUIRED ON PROTECTION PLATES WHEN TOP OF PLATE IS MORE THAN 16
INCHES ABOVE BOTTOM OF DOOR ON FIRE RATED OPENINGS. VERIFY DOOR
MANUFACTURER’S UL LISTING FOR MAXIMUM HEIGHT AND WIDTH OF PROTECTION PLATE TO
BE USED.
Y. STOPS AND HOLDERS: STOPS AND HOLDERS OF ONE MANUFACTURER AS LISTED FOR
CONTINUITY OF DESIGN AND CONSIDERATION OF WARRANTY.
A.WALL STOPS: PROVIDE DOOR STOPS WHEREVER NECESSARY TO PREVENT DOOR OR
HARDWARE FROM STRIKING AN ADJACENT PARTITION OR OBSTRUCTION. PROVIDE WALL
STOPS WHEN POSSIBLE. DOOR STOPS AND HOLDERS MOUNTED IN CONCRETE FLOOR OR
MASONRY WALLS HAVE STAINLESS STEEL MACHINE SCREWS AND LEAD EXPANSION SHIELDS.
B.PRODUCTS TO BE CERTIFIED AND LISTED BY THE FOLLOWING:
1. AUXILIARY HARDWARE: ANSI/BHMA A156.16.
C. OVERHEAD STOPS AND HOLDERS: PROVIDE OVERHEAD STOPS AND HOLDERS FOR DOORS
THAT OPEN AGAINST EQUIPMENT, CASEWORK SIDELIGHTS AND OTHER OBJECTS THAT WOULD
MAKE WALL STOPS/HOLDERS AND FLOOR STOPS/HOLDERS INAPPROPRIATE. PROVIDE SEX BOLT
ATTACHMENTS FOR MINERAL CORE WOOD DOOR APPLICATIONS.
D.PRODUCTS TO BE CERTIFIED AND LISTED BY THE FOLLOWING:
1. OVERHEAD STOPS AND HOLDERS: ANSI/BHMA A156.8 GRADE 1.
Z. THRESHOLDS: THRESHOLDS OF ONE MANUFACTURER AS LISTED FOR CONTINUITY OF DESIGN
AND CONSIDERATION OF WARRANTY.
A.SET THRESHOLDS FOR EXTERIOR AND ACOUSTICAL OPENINGS IN FULL BED OF SEALANT
WITH LEAD EXPANSION SHIELDS AND STAINLESS-STEEL MACHINE SCREWS COMPLYING WITH
REQUIREMENTS SPECIFIED IN DIVISION 07 SECTION “JOINT SEALANTS: NOTCHED IN FIELD TO
FIT FRAME BY HARDWARE INSTALLER. REFER TO DRAWINGS FOR SPECIAL DETAILS.
B.STANDARDS: MANUFACTURER TO BE CERTIFIED BY THE FOLLOWING:
1. THRESHOLDS: ANSI/BHMA A156.21.
2. AMERICAN WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG).
AA. DOOR GASKETING AND WEATHERSTRIP: DOOR GASKETING AND WEATHERSTRIP OF ONE
MANUFACTURER AS LISTED FOR CONTINUITY OF DESIGN AND CONSIDERATION OF WARRANTY.
A.PROVIDE CONTINUOUS WEATHERSTRIP GASKETING ON EXTERIOR DOORS AND PROVIDE
SMOKE, LIGHT, OR SOUND GASKETING WHERE INDICATED ON HARDWARE SCHEDULE.
PROVIDE NONCORROSIVE FASTENERS FOR EXTERIOR APPLICATIONS.
1. PERIMETER GASKETING: APPLY TO HEAD AND JAMB, FORMING SEAL BETWEEN DOOR
AND FRAME.
2. MEETING STILE GASKETING: FASTEN TO MEETING STILES, FORMING SEAL WHEN DOORS
ARE IN CLOSED POSITION.
3. DOOR BOTTOMS: APPLY TO BOTTOM OF DOOR, FORMING SEAL WITH THRESHOLD OR
FLOOR WHEN DOOR IS IN CLOSED POSITION.
4. SOUND GASKETING: CUTTING OR NOTCHING FOR STOP MOUNTED HARDWARE NOT
PERMITTED.
5. DRIP GUARD: APPLY TO EXTERIOR FACE OF FRAME HEADER. LIP LENGTH TO EXTEND 4”
BEYOND WIDTH OF DOOR.
B.PRODUCTS TO BE CERTIFIED AND LISTED BY THE FOLLOWING:
1. DOOR GASKETING AND EDGE SEAL SYSTEMS: ANSI/BHMA A156.22.
2. BHMA CERTIFIED FOR DOOR SWEEPS, AUTOMATIC DOOR BOTTOMS, AND ADHESIVE
APPLIED GASKETING.
C. REFER TO SECTION 08 1416 WOOD DOORS FOR CATEGORY A OR CATEGORY B.
COMPLY WITH UBC 7-2 AND UL10C POSITIVE PRESSURE WHERE FRAME APPLIED INTUMESCENT
SEALS ARE REQUIRED.
Q. FLUSH BOLTS: FLUSH BOLTS OF ONE MANUFACTURER AS LISTED FOR CONTINUITY OF DESIGN
AND CONSIDERATION OF WARRANTY. MANUFACTURER TO BE LISTED BY THE FOLLOWING:
AUXILIARY HARDWARE: ANSI/BHMI A156.16. LABELED OPENINGS: PROVIDE AUTOMATIC OR
CONSTANT LATCHING FLUSH BOLTS PER HARDWARE SCHEDULE FOR INACTIVE LEAF OF PAIRS OF
DOORS. PROVIDE DUST PROOF STRIKES FOR BOTTOM BOLT. NON-LABELED OPENINGS:
PROVIDE TWO FLUSH BOLTS FOR INACTIVE LEAF OF PAIRS OF DOORS PER HARDWARE SCHEDULE.
PROVIDE EXTENSION RODS SO THAT THE CENTER LINE OF THE TOP FLUSH BOLT IS NOT MORE
THAN 78” ABOVE THE FINISH FLOOR. PROVIDE DUST PROOF STRIKE FROM BOTTOM BOLT.
R. HEAVY DUTY CYLINDRICAL LOCKS AND LATCHES: LOCKS AND LATCHES OF ONE
MANUFACTURER AS LISTED FOR CONTINUITY OF DESIGN AND CONSIDERATION OF WARRANTY.
A.STANDARDS: PRODUCT TO BE CERTIFIED AND LISTED BY FOLLOWING:
1.ANSI/BHMA A156.2 SERIES 4000 CERTIFIED TO GRADE 1.
2.UL/CUL LABELED AND LISTED FOR FUNCTIONS UP TO 3 HOURS FOR SINGLE DOORS UP
TO 48” IN WIDTH AND UP TO 96” IN HEIGHT.
3.UL10C/UBC 7-2 POSITIVE PRESSURE RATED.
4.ICC/ANSI A1117.1
B.LOCK AND LATCH FUNCTION NUMBERS AND DESCRIPTIONS OF MANUFACTURER’S SERIES
AS LISTED IN HARDWARE SETS.
V.MATERIAL AND DESIGN:
1.LOCK AND LATCH CHASSIS TO BE ZINC DICHROMATE FOR CORROSION RESISTANCE.
2.KEYED FUNCTIONS TO BE OF A FREEWHEELING DESIGN TO HELP RESIST AGAINST
VANDALISM.
3.NON-HANDED, FIELD REVERSIBLE.
4.THRU BOLT MOUNTING WITH NO EXPOSED SCREWS.
5.LEVERS, ZINC CAST AND PLATED TO MATCH FINISHED DESIGNATION IN HARDWARE
SETS.
6.ROSES MADE OF WROUGHT BRASS OR STAINLESS-STEEL MATERIAL.
D.LATCH AND STRIKE:
1.STAINLESS STEEL LATCH BOLT WITH MINIMUM OF 1/2” THROW AND DEADLOCKING
FOR KEYED AND EXTERIOR FUNCTIONS. PROVIDE 3/4” LATCH BOLT FOR PAIRS OF FIRE-
RATED DOORS WHERE REQUIRED BY DOOR MANUFACTURER. STANDARD BACKSET TO
BE 2-3/4” AND ADJUSTABLE FACEPLATE TO ACCOMMODATE A SQUARE EDGE DOOR OR
A STANDARD 1/8” BEVELED EDGE DOOR.
2.STRIKE IS TO FIT A STANDARD ANSI A115 PREP MEASURING 1-1/4” X 4-7/8” WITH
PROPER LIP LENGTH TO PROTECT SURROUNDING TRIM.
S. INTERCONNECTED LOCKS AND LATCH: LOCKS AND LATCHES OF ONE MANUFACTURER AS
LISTED FOR CONTINUITY OF DESIGN AND CONSIDERATION OF WARRANTY.
A.STANDARDS: PRODUCT TO BE CERTIFIED AND LISTED BY FOLLOWING:
1.ANSI/BHMA A156.12 SERIES 5000 CERTIFIED TO GRADE 2.
2.UL/CUL LABELED AND LISTED FOR FUNCTIONS UP TO 3 HOURS FOR SINGLE DOORS UP
TO 48” IN WIDTH AND UP TO 96” IN HEIGHT.
3.UL10C/UBC 7-2 POSITIVE PRESSURE RATED.
4.ICC/ANSI A117.1
B.LOCK AND LATCH FUNCTION NUMBERS AND DESCRIPTIONS OF MANUFACTURER’S SERIES AS
LISTED IN HARDWARE SETS.
C. MATERIAL AND DESIGN:
1.LOCK AND LATCH CHASSIS TO BE ZINC DICHROMATE FOR CORROSION RESISTANCE.
2.KEYED FUNCTIONS TO BE OF A FREEWHEELING DESIGN TO HELP RESIST AGAINST
VANDALISM.
3.NON-HANDED, FIELD REVERSIBLE.
4.LEVERS, ZINC CAST AND PLATED TO MATCH FINISH DESIGNATION IN HARDWARE SETS.
5.ROSES, SOLID BRASS OR STAINLESS-STEEL MATERIAL AND HAVE A MINIMUM DIAMETER OF
2-1/2”.
T. EXIT DEVICES: EXIT DEVICES OF ONE MANUFACTURER AS LISTED FOR CONTINUITY OF DESIGN
AND CONSIDERATION OF WARRANTY. TOUCHPAD TYPE FINISH TO MATCH BALANCE OF DOOR
HARDWARE.
A.STANDARDS: MANUFACTURER TO BE CERTIFIED AND/OR LISTED BY THE FOLLOWING:
1.BHMA CERTIFIED ANSI A156.3 GRADE 1.
2.UL/CUL LISTED FOR UP TO 3 HOURS FOR “A” LABELED DOORS.
3.UL10C/UBC 7-2 POSITIVE PRESSURE RATED.
4.UL10B NEUTRAL PRESSURE RATED.
5.UL 305 LISTED FOR PANIC HARDWARE.
B.MATERIAL AND DESIGN:
1.PROVIDE EXIT DEVICES WITH ACTUATORS THAT EXTEND A MINIMUM OF ONE-HALF OF
DOOR WIDTH.
2.WHERE TRIM IS INDICATED IN HARDWARE SETS PROVIDE THE LEVER DESIGN TO MATCH
DESIGN OF LOCK LEVERS.
3.EXIT DEVICE TO MOUNT FLUSH WITH DOOR.
8.0 DOORS AND WINDOWS 4.LATCH BOLTS:
A.RIM DEVICE – 3/4” THROW, PULLMAN TYPE WITH AUTOMATIC DEAD-LATCHING,
STAINLESS STEEL
B.SURFACE VERTICAL ROD DEVICE – TOP 1/2” THROW, PULLMAN TYPE WITH
AUTOMATIC DEAD-LATCHING, STAINLESS STEEL. BOTTOM 1/2” THROW, PULLMAN
TYPE, HELD RETRACTED DURING DOOR SWING, STAINLESS STEEL.
5.FASTENERS: WOOD SCREWS, MACHINE SCREWS, AND THRU BOLTS.
C. LOCK AND LATCH FUNCTIONS: FUNCTION NUMBERS AND DESCRIPTIONS OF
MANUFACTURER’S SERIES AND LEVER STYLES INDICATED IN DOOR HARDWARE SETS.
U. CYLINDERS AND KEYING:CYLINDERS OF ONE MANUFACTURER AS LISTED FOR CONTINUITY OF
DESIGN AND CONSIDERATION OF WARRANTY.
A.PRODUCTS TO BE CERTIFIED AND LISTED BY THE FOLLOWING:
1.AUXILIARY LOCKS: ANSI/BHMA A156.5
B.CYLINDERS:
1.PROVIDE CYLINDERS MATCHED TO THE TYPES REQUIRED FOR HARDWARE THAT HAS A
LOCKING FUNCTION AND FOR KEYED ELECTRONIC FUNCTIONS. FURNISH WITH
APPROPRIATE COLLARS, CAMS, AND TAILPIECES TO FIT AND OPERATE ASSOCIATED
HARDWARE. STACKING COLLARS IS NOT ACCEPTABLE, A SINGLE COLLAR OF PROPER SIZE
IS REQUIRED.
2.MANUFACTURER’S SIX-PIN/SEVEN-PIN SMALL FORMAT INTERCHANGEABLE CORE (SFIC).
3.MATCH EXISTING FACILITY STANDARD.
C. KEYING:
1.KEY INTO OWNER’S EXISTING KEY SYSTEM.
2.PROVIDE A BITTING LIST TO OWNER OF COMBINATIONS AS ESTABLISHED AND EXPAND
TO TWENTY-FIVE PERCENT FOR FUTURE USE OR AS DIRECTED BY OWNER.
A.INCLUDE ALL THE KEYSETS AND BITTINGS OF THE ORIGINAL KEY SYSTEM CREATING
ONE CLEAN VERSION OF THE ENTIRE KEY SYSTEM.
3.KEYS TO BE SHIPPED DIRECTLY TO THE OWNER’S REPRESENTATIVE AS ESTABLISHED
DURING THE KEYING CONFERENCE.
A.PACKAGE THE KEYS IN INDIVIDUAL ENVELOPES, GROUPED BY KEYSET SYMBOL, AND
LABEL ENVELOPES WITH PROJECT NAME, FACTORY REGISTRY NUMBER, AND KEYSET
SYMBOL.
4.STAMP LARGE BOW KEY BLANKS WITH VISUAL KEY CONTROL (KEYSET SYMBOL) AND “DO
NOT DUPLICATE”.
5.PROVIDE INTERCHANGEABLE CORES WITH CONSTRUCTION CORES AS REQUIRED PER
THE KEYING MEETING.
V. PUSH/PULL PLATES AND BARS: PUSH/PULL PLATES AND BARS OF ONE MANUFACTURER AS
LISTED FOR CONTINUITY OF DESIGN AND CONSIDERATION OF WARRANTY.
A.STANDARDS: MANUFACTURER TO BE CERTIFIED BY THE FOLLOWING:
1.ARCHITECTURAL DOOR TRIM: ANSI/BHMA A156.6.
2.AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG).
B.PUSH PLATES: .050” THICK, SQUARE CORNER AND BEVELED EDGES WITH COUNTERSUNK
SCREW HOLES. WIDTH AND HEIGHT AS STATED IN HARDWARE SETS.
C. ACCEPTABLE MANUFACTURERS:
D.PULL PLATES: 1” DIAMETER PULL, WITH CLEARANCE OF 2-1/2” FROM FACE OF DOOR.
E. PUSH/PULL BAR SETS: 1” ROUND BAR STOCK WITH 2-1/2” CLEARANCES FROM FACE OF
DOOR. CENTER TO CENTER SIZE SHOULD BE DOOR WIDTH LESS 1 STILE WIDTH.
F. OFFSET VERTICAL DOOR PULL: 1-1/4” ROUND BAR STOCK WITH 2-1/2” CLEARANCES FROM
FACE OF DOOR.
W. CLOSERS: CLOSERS OF ONE MANUFACTURER AS LISTED FOR CONTINUITY OF DESIGN AND
CONSIDERATION OF WARRANTY, UNLESS OTHERWISE INDICATED ON HARDWARE SCHEDULE,
COMPLY WITH MANUFACTURER’S RECOMMENDATIONS FOR SIZE OF CLOSER, DEPENDING ON
WIDTH OF DOOR, FREQUENCY OF USE, ATMOSPHERIC PRESSURE, ADAAG REQUIREMENT, AND FIRE
RATING.
A.STANDARDS: MANUFACTURER TO BE CERTIFIED AND OR LISTED BY THE FOLLOWING:
1.BHMA CERTIFIED ANSI A156.4 GRADE 1.
2.ADA COMPLAINT ANSI A117.1.
3.UL/CUL LISTED UP TO 3 HOURS.
4.UL10C POSITIVE PRESSURE RATED.
5.UL10B NEUTRAL PRESSURE RATED.
B.MATERIAL AND DESIGN:
1.PROVIDE CAST IRON NON-HANDED BODIES WITH FULL PLASTIC COVERS.
2.CLOSERS WILL HAVE SEPARATED STAKED ADJUSTABLE VALVE SCREWS FOR LATCH SPEED,
SWEEP SPEED, AND BACKCHECK.
3.PROVIDE TRI-PACK ARMS AND BRACKETS FOR REGULAR ARM, TOP JAMB, AND PARALLEL
ARM MOUNTING.
4.ONE-PIECE SEAMLESS STEEL SPRING TUBE SEALED IN HYDRAULIC FLUID.
5.DOUBLE HEAT-TREATED STEEL TEMPERED SPRINGS.
6.PRECISION-MACHINED HEAT-TREATED STEEL PISTON.
7.TRIPLE HEAT-TREATED STEEL SPINDLE.
8.FULL RACK AND PINION OPERATION.
C. MOUNTING:
1.OUT-SWING DOORS USE SURFACE PARALLEL ARM MOUNT CLOSERS EXCEPT WHERE
NOTED ON HARDWARE SCHEDULE.
2.IN-SWING DOORS USE SURFACE REGULAR ARM MOUNT CLOSERS EXCEPT WHERE NOTED
ON HARDWARE SCHEDULE.
3.PROVIDE BRACKETS AND SHOE SUPPORTS FOR ALUMINUM DOORS AND FRAMES TO
MOUNT FIFTH SCREW.
4.FURNISH DROP PLATES WHERE TOP RAIL CONDITIONS ON DOOR DO NOT ALLOW FOR
MOUNTING OF CLOSER AND WHERE BACKSIDE OF CLOSER IS EXPOSED THROUGH GLASS.
D.SIZE CLOSERS IN COMPLIANCE WITH REQUIREMENTS FOR ACCESSIBILITY (ADAAG). COMPLY
WITH FOLLOWING MAXIMUM OPENING FORCE REQUIREMENTS.
1.INTERIOR HINGED OPENINGS: 5.0 LBS.
2.FIRE-RATED AND EXTERIOR OPENINGS USE MINIMUM OPENING FORCE ALLOWABLE BY
AUTHORITY HAVING JURISDICTION.
E. FASTENERS: PROVIDE SELF-REAMING, SELF-TAPPING WOOD AND MACHINE SCREWS, AND
SEX NUTS AND BOLTS FOR EACH CLOSER.
7.4 METAL WALL PANELS
I. COLD-FORMED METAL FRAMING:
1. MANUFACTURERS: REFER TO STRUCTURAL, AS SELECTED BY CONTRACTOR
2. APPLICATION: EXTERIOR NON-LOAD-BEARING STEEL-STUD WALLS.
3. APPLICATION: INTERIOR NON-LOAD-BEARING STEEL-STUD WALLS.
5. STRUCTURAL FRAMING: SEE STRUCTURAL PLANS
6. UNITS 16 GAUGE (.0598 INCH) AND HEAVIER: ASTM A 653, YIELD POINT 50,000.
7. UNITS 18 GAUGE (.0358 INCH): ASTM A 653, YIELD POINT 37,000 PSI.
8. UNITS 20 GAUGE (.0329 INCH): ASTM A 653, YIELD POINT 33,000 PSI.
10. FRAMING ACCESSORIES:
a. SUPPLEMENTARY FRAMING.
b. BRACING, BRIDGING, AND SOLID BLOCKING.
c. WEB STIFFENERS.
d. GUSSET PLATES.
e. DEFLECTION TRACK AND VERTICAL SIDE CLIPS.
f. STUD KICKERS AND GIRTS.
g. JOIST HANGERS AND END CLOSURES.
h. REINFORCEMENT PLATES.
i. ANCHORS, CLIPS, AND FASTENERS.
J. INSTALL MATERIALS AND SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS
AND APPROVED SUBMITTALS. INSTALL MATERIALS AND SYSTEMS IN PROPER RELATION WITH
ADJACENT CONSTRUCTION. COORDINATE WITH WORK OF OTHER SECTIONS.
K. COMPLY WITH REQUIREMENTS OF ASTM C 1007 FOR INSTALLATION OF STEEL STUDS AND
ACCESSORIES AND METAL LATH/STEEL FRAMING ASSOCIATION LIGHTWEIGHT STEEL FRAMING
SYSTEMS MANUAL.
L. RESTORE DAMAGED COMPONENTS. PROTECT WORK FROM DAMAGE.
A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
B. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS INDICATING MATERIAL CHARACTERISTICS, DETAILS
OF CONSTRUCTION, CONNECTIONS, AND RELATIONSHIP WITH ADJACENT CONSTRUCTION.
1. SHOP DRAWINGS SHALL BE PREPARED AND STAMPED BY A QUALIFIED ENGINEER
LICENSED IN THE JURISDICTION OF THE PROJECT.
C. ENGINEERING CERTIFICATION: SUBMIT FOR APPROVAL ENGINEERING CERTIFICATION OF
DEFLECTION CRITERIA.
D. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
E. STANDARDS: AISI, SPECIFICATION FOR DESIGN OF COLD-FORMED STEEL STRUCTURAL
MEMBERS.
F. DEFLECTION CRITERIA FOR EXTERIOR MASONRY VENEER: L/600.
G. FABRICATION TOLERANCES: 1/8 INCH IN 10 FEET.
H. ERECTION TOLERANCES: 1/16 INCH FROM TRUE POSITION.
5.1 COLD-FORMED METAL FRAMING
8. AUXILIARY MATERIALS:
a. SOLDER COMPATIBLE WITH METAL.
b. BITUMINOUS ISOLATION COATING.
c. MASTIC AND ELASTOMERIC SEALANTS.
d. EPOXY SEAM SEALER.
e. ROSIN-SIZED BUILDING PAPER SLIP SHEET.
f. POLYETHYLENE UNDERLAYMENT.
g. REGLETS AND METAL ACCESSORIES.
h. GUTTER AND CONDUCTOR HEAD GUARDS.
i. ASPHALTIC ROOFING CEMENT.
F. FOLLOW RECOMMENDATIONS OF SMACNA SHEET METAL MANUAL. ALLOW FOR EXPANSION.
ISOLATE DISSIMILAR MATERIALS.
G. INSTALL MATERIALS AND SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS
AND APPROVED SUBMITTALS. INSTALL MATERIALS AND SYSTEMS IN PROPER RELATION WITH
ADJACENT CONSTRUCTION AND WITH UNIFORM APPEARANCE. COORDINATE WITH WORK OF
OTHER SECTIONS.
H. RESTORE DAMAGED COMPONENTS AND FINISHES. CLEAN AND PROTECT WORK FROM
DAMAGE.
A. DEFINITIONS
A.WEATHER BARRIER: A COMBINATION OF MATERIALS AND ACCESSORIES THAT DO THE
FOLLOWING:
1.PREVENT THE ACCUMULATION OF WATER AS A WATER-RESISTIVE BARRIER.
2.MINIMIZE THE AIR LEAKAGE INTO OR OUT OF THE BUILDING ENVELOPE AS A
CONTINUOUS AIR BARRIER.
3.PROVIDE SUFFICIENT WATER VAPOR TRANSMISSION TO ENABLE DRYING AS A VAPOR-
PERMEABLE MEMBRANE.
B. ACTION SUBMITTALS
A.PRODUCT DATA: FOR EACH TYPE OF PRODUCT.
1.FOR WEATHER BARRIER, INCLUDE DATA ON AIR AND WATER-VAPOR PERMEANCE BASED
ON TESTING IN ACCORDANCE WITH REFERENCED STANDARDS.
C. INFORMATIONAL SUBMITTALS
A.EVALUATION REPORTS: FROM ICC-ES.
B.MANUFACTURER'S INSTRUCTIONS: FOR INSTALLATION OF EACH PRODUCT SPECIFIED.
C. QUALIFICATION DATA: FOR INSTALLER.
D.SAMPLE WARRANTY: FOR MANUFACTURER'S WARRANTY.
E. REPORTS: FIELD TEST AND INSPECTION REPORTS.
F. INSTALLER'S WEATHER BARRIER MANUFACTURER-TRAINING CERTIFICATE.
D. QUALITY ASSURANCE
A.INSTALLER QUALIFICATIONS: A QUALIFIED FIRM THAT IS CERTIFIED BY WEATHER BARRIER SYSTEM
MANUFACTURER TO INSTALL MANUFACTURER'S PRODUCT.
E. DELIVERY, STORAGE, AND HANDLING
A.DO NOT STORE NEAR HEAT SOURCE OR OPEN FLAME.
F. WARRANTY
1.WARRANTY PERIOD: 10 YEARS FROM DATE OF PURCHASE.
G. MANUFACTURERS
A.SOURCE LIMITATIONS: OBTAIN WEATHER BARRIER ASSEMBLY COMPONENTS, INCLUDING
WEATHER BARRIER FLASHING FROM SAME MANUFACTURER AS WEATHER BARRIER.
H. PERFORMANCE REQUIREMENTS
A.GENERAL PERFORMANCE: INSTALLED WEATHER BARRIER AND ACCESSORIES SHALL WITHSTAND
SPECIFIED WIND PRESSURES, LIQUID WATER PENETRATION, AND WATER VAPOR PRESSURES
WITHOUT FAILURE DUE TO DEFECTIVE MANUFACTURE OF PRODUCTS.
I. WEATHER BARRIER
A.COMMERCIAL BUILDING WRAP: ASTM E2357 PASSED, ABAA (AIR BARRIER ASSOCIATION OF
AMERICA) EVALUATED AIR BARRIER ASSEMBLY, AND ASSEMBLY WATER RESISTANCE PER ASTM E331;
WITH FLAME-SPREAD AND SMOKE-DEVELOPED INDEXES OF LESS THAN 25 AND 450,
RESPECTIVELY, WHEN TESTED IN ACCORDANCE WITH ASTM E84; UV STABILIZED FOR NINE-
MONTH EXPOSURE; AND ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.
1.BASIS-OF-DESIGN PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE
DUPONT DE NEMOURS, INC.; TYVEK COMMERCIALWRAP
J. WEATHER BARRIER FLASHING
1.BASIS-OF-DESIGN PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE
DUPONT DE NEMOURS, INC.; DUPONT™ FLEXWRAP™
2.CONFORMABILITY: ABLE TO CREATE A SEAMLESS SILL PAN EXTENDING UP THE JAMBS
WITHOUT CUTS, PATCHES, OR FASTENERS.
3.WATER PENETRATION: NO LEAKAGE AT 15 PSF (720 PA) PER ASTM E331.
4.LOW TEMPERATURE ADHESION: EXCEEDS MINIMUM VALUE OF 1.5 LB./IN. (0.26N/MM) AT
25 DEG F (MINUS 4 DEG C) AS CLASS A (WITHOUT PRIMER USE).
5.ADHESION AFTER WATER IMMERSION: EXCEEDS MINIMUM VALUE OF 1.5 LB./IN.
(0.26N/MM), AFTER AAMA 800, SECTIONS 2.4.1.3.1/2.4.1.4.3, TEST B.
K. STRIP FLASHING: COMPOSITE FLASHING MATERIAL COMPOSED OF SPUNBONDED POLYETHYLENE
LAMINATE WITH 100 PERCENT BUTYL-BASED, DUAL-SIDED, ADHESIVE LAYER; AAMA 711, CLASS A (NO
PRIMER), LEVEL 3 THERMAL EXPOSURE, 176 DEG F (80 DEG C) FOR SEVEN DAYS.
1.BASIS-OF-DESIGN PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE
DUPONT DE NEMOURS, INC.; [DUPONT™STRAIGHTFLASH™
2.WATER PENETRATION: NO LEAKAGE AT 15 PSF (720 PA) PER ASTM E331.
3.LOW TEMPERATURE ADHESION: EXCEEDS MINIMUM VALUE OF 1.5 LB./IN. (0.26N/MM) AT
25 DEG F (MINUS 4 DEG C) AS CLASS A WITHOUT PRIMER USE.
4.ADHESION AFTER WATER IMMERSION: EXCEEDS MINIMUM VALUE OF 1.5 LB./IN.
(0.26N/MM), AFTER AAMA 800, SECTIONS 2.4.1.3.1/2.4.1.4.3, TEST B.
L. BUILDING WRAP TAPE: PRESSURE-SENSITIVE PLASTIC TAPE RECOMMENDED BY WEATHER BARRIER
MANUFACTURER FOR SEALING JOINTS AND PENETRATIONS IN COMMERCIAL BUILDING WRAP.
1.BASIS-OF-DESIGN PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE
DUPONT DE NEMOURS, INC.; TYVEK® TAPE OR COMPARABLE PRODUCT.
M. EXAMINATION
A.EXAMINE SUBSTRATES, WITH INSTALLER PRESENT, FOR COMPLIANCE WITH REQUIREMENTS.
B.VERIFY THAT SUBSTRATE AND SURFACE CONDITIONS ARE IN ACCORDANCE WITH COMMERCIAL
WEATHER BARRIER MANUFACTURER RECOMMENDATIONS PRIOR TO INSTALLATION.
1.VERIFY THAT ROUGH SILL FRAMING FOR DOORS AND WINDOWS IS SLOPED
DOWNWARDS TOWARDS THE EXTERIOR AND IS LEVEL ACROSS WIDTH OF THE OPENING.
C. VERIFY THAT SURFACES TO RECEIVE WEATHER BARRIER FLASHING ARE CLEAN, DRY, AND FREE
OF FROST.
D.PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN
CORRECTED.
N. PREPARATION
A.DIRECT WATER ONTO AN ACCEPTABLE WEATHER BARRIER DRAINAGE PLANE WITH AN
UNOBSTRUCTED PATH TO EXTERIOR OF WALL.
1.PROVIDE A DRAINAGE PATH FOR WATER INTRUSION THROUGH WINDOW AND DOOR
ATTACHMENT SYSTEM THAT COLLECTS AT WINDOW AND DOOR SILLS AND DIRECTS WATER
TO THE EXTERIOR OR WEATHER BARRIER.
O. COMMERCIAL BUILDING WRAP INSTALLATION
A.GENERAL: COMPLY WITH WEATHER BARRIER MANUFACTURER'S WRITTEN INSTALLATION
GUIDELINES AND WARRANTY REQUIREMENTS.
B.COVER EXPOSED EXTERIOR SURFACE OF SHEATHING WITH WEATHER BARRIER SECURELY
FASTENED TO FRAMING IMMEDIATELY AFTER SHEATHING IS INSTALLED.
1.MAINTAIN CONTINUITY OF AIR AND WATER BARRIER ASSEMBLIES.
2.START WEATHER BARRIER INSTALLATION AT A BUILDING CORNER, LEAVING 12 INCHES
(300 MM) OF WEATHER BARRIER EXTENDED BEYOND CORNER TO OVERLAP.
3.INSTALL WEATHER BARRIER HORIZONTALLY STARTING AT LOWER PORTION OF WALL
SURFACE.
4.PROVIDE MINIMUM 6 INCHES (150 MM) OVERLAP AT HORIZONTAL- AND VERTICAL-WRAP
SEAMS IN A SHINGLE MANNER TO MAINTAIN CONTINUOUS DOWNWARD DRAINAGE
PLANE AND AIR AND WATER BARRIER.
C. SEAMS: SEAL SEAMS WITH BUILDING WRAP TAPE PER MANUFACTURER'S RECOMMENDED
INSTALLATION INSTRUCTIONS.
1.SHIPLAP HORIZONTAL SEAMS IN WEATHER BARRIER TO FACILITATE PROPER DRAINAGE.
D.FASTENERS: USE WEATHER BARRIER MANUFACTURER'S RECOMMENDED FASTENERS TO SECURE
WEATHER BARRIER AND INSTALL FASTENERS ACCORDING TO WEATHER BARRIER MANUFACTURER'S
INSTALLATION GUIDELINES.
1.DO NOT USE TEMPORARY FASTENERS TO PERMANENTLY ATTACH WEATHER BARRIER.
2.DO NOT PLACE FASTENERS WITH GASKETING WASHERS WHERE WEATHER BARRIER
FLASHING WILL BE INSTALLED.
3.INSTALL FASTENERS WITH GASKETING WASHERS THROUGH FLASHING WHERE
RECOMMENDED BY MANUFACTURER.
E. OPENINGS: COMPLETELY COVER OPENINGS WITH WEATHER BARRIER, THEN CUT WEATHER
BARRIER MEMBRANE TO OPENINGS IN ACCORDANCE WITH WEATHER BARRIER MANUFACTURER'S
INSTALLATION GUIDELINES.
1.PROVIDE HEAD AND JAMB FLAPS AND SEAM OVERLAPS TO MAINTAIN CONTINUOUS
DRAINAGE.
2.REPAIR DAMAGE TO WEATHER BARRIER USING METHOD RECOMMENDED BY WEATHER
BARRIER MANUFACTURER.
3.INSTALL FLASHING IN ACCORDANCE WITH WEATHER BARRIER MANUFACTURER'S
INSTALLATION GUIDELINES.
P. WEATHER BARRIER FLASHING INSTALLATION
A.INSTALLATION: REMOVE WRINKLES AND BUBBLES, REPOSITION WEATHER BARRIER AS
NECESSARY TO PRODUCE A UNIFORM, SMOOTH SURFACE.
1.ENSURE THAT AMBIENT AND SUBSTRATE SURFACE TEMPERATURES ARE ACCEPTABLE IN
ACCORDANCE WITH MANUFACTURER INSTRUCTIONS AND RECOMMENDATIONS.
2.WIPE SURFACES TO REMOVE MOISTURE, DIRT, GREASE AND OTHER DEBRIS THAT COULD
INTERFERE WITH ADHESION.
3.APPLY WEATHER BARRIER MANUFACTURER'S RECOMMENDED PRIMER OVER CONCRETE,
MASONRY, AND GLASS-MAT GYPSUM WALL SHEATHING SUBSTRATES TO RECEIVE WEATHER
BARRIER FLASHING.
4.LAP WEATHER BARRIER FLASHING A MINIMUM OF 2 INCHES (50 MM) ONTO WEATHER
BARRIER.
5.APPLY PRESSURE OVER ENTIRE SURFACE USING ROLLER OR FIRM HAND PRESSURE
B.ROUGH OPENINGS: SHIPLAP FLASHING WITH WEATHER BARRIER IN A SHINGLE MANNER TO
MAINTAIN A CONTINUOUS DOWNWARD DRAINAGE PLANE AND AIR AND WATER BARRIER IN
ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.
1.APPLY 6-INCH-(150-MM-)WIDE CONFORMABLE WEATHER BARRIER FLASHING AT DOOR
AND WINDOW SILLS.
2.ENSURE THAT SILL FLASHING DOES NOT SLOPE TO THE INTERIOR.
3.INSTALL BACKER ROD IN JOINT BETWEEN FRAME OF OPENING PRODUCT AND FLASHED
ROUGH OPENING ON THE INTERIOR.
4.APPLY SEALANT OR CLOSED-CELL POLYURETHANE FOAM INSULATION AROUND ENTIRE
OPENING/FENESTRATION PRODUCT TO CREATE AIR SEAL AROUND INTERIOR PERIMETER
OF WINDOW OPENINGS IN ACCORDANCE WITH WEATHER BARRIER MANUFACTURER'S
INSTRUCTIONS.
5.AROUND DOOR AND WINDOW OPENINGS, APPLY BUTYL-BASED FLASHING TO FLAPS OF
WEATHER BARRIER.
6.USE STRIP FLASHING WITH WRAP CAP SCREWS TO SECURE HEAD FLAP OF THE WINDOWS.
C. PENETRATIONS: APPLY WEATHER BARRIER MANUFACTURER'S RECOMMENDED WEATHER
BARRIER FLASHING PATCHES BEHIND FASTENING PLATES, SUCH AS BRICK-TIE BASE PLATES, METAL-
FLASHING CLIPS, AND METAL CHANNELS.
1.SEAL WEATHER BARRIER AROUND EACH PENETRATION WITH WEATHER BARRIER
MANUFACTURER'S RECOMMENDED SELF-ADHERED FLASHING PRODUCT OR SEALANT.
INTEGRATE PRODUCTS WITH FLANGES INTO THE WEATHER BARRIER.
D.TERMINATIONS: PROVIDE MINIMUM 2 INCHES (50 MM) OVERLAP USING STRIP FLASHING ON
ADJOINING ROOF AND BASE OF WALL SYSTEMS TO MAINTAIN CONTINUOUS DOWNWARD
DRAINAGE PLANE.
1.SECURE WEATHER BARRIER WITH FASTENERS AND WEATHER BARRIER FLASHING.
Q. CLEANING
A.IMMEDIATELY REMOVE RELEASE PAPER AND SCRAP FROM WORK AREA AND DISPOSE OF
MATERIAL.
R. PROTECTION
A.PROTECT INSTALLED WEATHER BARRIER FROM THE FOLLOWING:
1.DAMAGE FROM CLADDING, STRUCTURE, OR A COMPONENT OF THE STRUCTURE (FOR
EXAMPLE, WINDOW, DOOR, OR WALL SYSTEM).
2.CONTAMINATION FROM BUILDING SITE CHEMICALS, PREMATURE DETERIORATION OF
BUILDING MATERIALS, OR NONSTANDARD USE OR APPLICATION OF PRODUCTS.
3.FOREIGN OBJECTS OR AGENTS, INCLUDING THE USE OF MATERIALS INCOMPATIBLE
WITH WEATHER BARRIER PRODUCTS.
4.UV EXPOSURE IN EXCESS OF PRODUCTS' STATED LIMITS.
7.5 WEATHER BARRIERS
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
5
6
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A9.2
SPECIFICATIONS
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
10. AUXILIARY MATERIALS:
a. CORNERBEAD, EDGE TRIM AND CONTROL JOINTS.
b. EXTRUDED ALUMINUM REVEALS AND CHANNELS.
c. GYPSUM BOARD SCREWS, ASTM C 1002.
d. GYPSUM BOARD NAILS, ASTM C 514.
e. FASTENING ADHESIVE.
f. CONCEALED ACOUSTICAL SEALANT.
g. MINERAL FIBER SOUND ATTENUATION BLANKETS.
h. MINERAL FIBER THERMAL INSULATION.
i. POLYETHYLENE VAPOR RETARDER, 6 MILS.
j. POLYSTYRENE AGGREGATED FINISH FOR CEILINGS.
k. ACOUSTICAL FINISH.
H. INSTALL GYPSUM BOARD FOR TAPE AND 3-COAT JOINT COMPOUND FINISH IN COMPLIANCE
WITH ASTM C 840 AND GA 216, LEVEL 4 FINISH. INSTALL GYPSUM BOARD ASSEMBLIES TRUE,
PLUMB, LEVEL AND IN PROPER RELATION TO ADJACENT SURFACES.
I. PROVIDE FIRE-RATED SYSTEMS WHERE INDICATED AND WHERE REQUIRED BY AUTHORITIES
HAVING JURISDICTION.
J. INSTALL BOARDS VERTICALLY. DO NOT ALLOW BUTT-TO-BUTT JOINTS AND JOINTS THAT DO
NOT FALL OVER FRAMING MEMBERS.
K. WHERE NEW PARTITIONS MEET EXISTING CONSTRUCTION, REMOVE EXISTING CORNERBEADS
TO PROVIDE A SMOOTH TRANSITION.
L. PROVIDE INSULATION FULL HEIGHT AND THICKNESS IN PARTITIONS AT CONFERENCE ROOMS,
TOILET ROOMS, BETWEEN DIFFERENT OCCUPANCIES, AND WHERE REQUIRED.
A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
B. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
C. TOLERANCES: NOT MORE THAN 1/16-INCH DIFFERENCE IN TRUE PLANE AT JOINTS BETWEEN
ADJACENT BOARDS BEFORE FINISHING. AFTER FINISHING, JOINTS SHALL BE NOT BE VISIBLE.
NOT MORE THAN 1/8 INCH IN 10 FEET DEVIATION FROM TRUE PLANE, PLUMB, LEVEL AND
PROPER RELATION TO ADJACENT SURFACES IN FINISHED WORK.
D. FIRE RESISTANCE FOR FIRE-RATED ASSEMBLIES: ASTM E 119.
E. MOCK-UPS: PROVIDE MOCK-UP AS REQUIRED TO DEMONSTRATE QUALITY OF WORKMANSHIP
AND LEVEL OF FINISH.
F. PERFORMANCE: FIRE, STRUCTURAL, AND SEISMIC PERFORMANCE MEETING REQUIREMENTS OF
BUILDING CODE AND LOCAL AUTHORITIES.
G. GYPSUM BOARD:
1. MANUFACTURERS: AS SELECTED BY CONTRACTOR
2. APPLICATION: INTERIOR WALLS, PARTITIONS, AND CEILINGS WITH TAPE AND JOINT
COMPOUND FINISH.
3. MATERIAL STANDARD: ASTM C1396.
9.1 GYPSUM BOARD ASSEMBLIES
M. PROVIDE ACOUSTICAL SEALANT AT BOTH FACES AT TOP AND BOTTOM RUNNER TRACKS, WALL
PERIMETERS, OPENINGS, EXPANSION AND CONTROL JOINTS.
N. INSTALL TRIM IN STRICT COMPLIANCE WITH MANUFACTURER'S INSTRUCTIONS AND
RECOMMENDATIONS.
O. REPAIR SURFACE DEFECTS. LEAVE READY FOR FINISH PAINTING OR WALL TREATMENT.
4. TYPE: BOARD FOR TAPE AND JOINT COMPOUND FINISH.
a. TYPE: REGULAR
c. TYPICAL THICKNESS: 5/8 INCH.
5. JOINT TREATMENT: ASTM C474 AND ASTM C840, 3-COAT SYSTEM, PAPER OR
FIBERGLASS TAPE.
9.2 ACOUSTICAL CEILINGS
A. SECTION INCLUDES
a. ACOUSTICAL CEILING PANELS
b. GRID SUSPENSION SYSTEM
c. WIRE HANGERS, FASTENERS, MAIN RUNNERS, CROSS TEES, AND WALL ANGLE
MOLDINGS
d. PERIMETER TRIM
B. ALTERNATES
a. PRIOR APPROVAL: UNLESS OTHERWISE PROVIDED FOR IN THE CONTRACT
DOCUMENTS, PROPOSED PRODUCT SUBSTITUTIONS MAY BE SUBMITTED NO
LATER THAN TEN (10) WORKING DAYS PRIOR TO THE DATE ESTABLISHED FOR
RECEIPT OF BIDS. ACCEPTABILITY OF A PROPOSED SUBSTITUTION IS
CONTINGENT UPON THE ARCHITECT'S REVIEW OF THE PROPOSAL FOR
ACCEPTABILITY AND APPROVED PRODUCTS WILL BE SET FORTH BY THE ADDENDA.
IF INCLUDED IN A BID ARE SUBSTITUTE PRODUCTS THAT HAVE NOT BEEN
APPROVED BY ADDENDA, THE SPECIFIED PRODUCTS SHALL BE PROVIDED
WITHOUT ADDITIONAL COMPENSATION.
b. SUBMITTALS THAT DO NOT PROVIDE ADEQUATE DATA FOR THE PRODUCT
EVALUATION WILL NOT BE CONSIDERED. THE PROPOSED SUBSTITUTION MUST
MEET ALL REQUIREMENTS OF THIS SECTION, INCLUDING BUT NOT NECESSARILY
LIMITED TO, THE FOLLOWING: SINGLE SOURCE MATERIALS SUPPLIERS (IF
SPECIFIED IN SECTION 1.5); UNDERWRITERS' LABORATORIES CLASSIFIED
ACOUSTICAL PERFORMANCE; PANEL DESIGN, SIZE, COMPOSITION, COLOR, AND
FINISH; SUSPENSION SYSTEM COMPONENT PROFILES AND SIZES; COMPLIANCE
WITH THE REFERENCED STANDARDS.
• IF THE MATERIAL SUPPLIED BY THE ACOUSTICAL SUBCONTRACTOR DOES
NOT HAVE AN UNDERWRITER'S LABORATORY CLASSIFICATION OF
ACOUSTICAL PERFORMANCE ON EVERY CARTON, SUBCONTRACTOR
SHALL BE REQUIRED TO SEND MATERIAL FROM EVERY PRODUCTION RUN
APPEARING ON THE JOB TO AN INDEPENDENT OR NVLAP APPROVED
LABORATORY FOR TESTING, AT THE ARCHITECT'S OR OWNER'S
DISCRETION. ALL PRODUCTS NOT CONFORMING TO MANUFACTURER'S
CURRENT PUBLISHED VALUES MUST BE REMOVED, DISPOSED OF AND
REPLACED WITH COMPLYING PRODUCT AT THE EXPENSE OF THE
CONTRACTOR PERFORMING THE WORK.
D. QUALITY ASSURANCE
a. SINGLE-SOURCE RESPONSIBILITY: PROVIDE ACOUSTICAL PANEL UNITS AND GRID
COMPONENTS BY A SINGLE MANUFACTURER.
b. FIRE PERFORMANCE CHARACTERISTICS: IDENTIFY ACOUSTICAL CEILING
COMPONENTS WITH APPROPRIATE MARKINGS OF APPLICABLE TESTING AND
INSPECTING ORGANIZATION.
c. SURFACE BURNING CHARACTERISTICS: AS FOLLOWS, TESTED PER ASTM E 84 AND
COMPLYING WITH ASTM E 1264 CLASSIFICATION.
d. FIRE RESISTANCE: AS FOLLOWS TESTED PER ASTM E119 AND LISTED IN THE
APPROPRIATE FLOOR OR ROOF DESIGN IN THE UNDERWRITERS LABORATORIES
FIRE RESISTANCE DIRECTORY
e. ACOUSTICAL PANELS: AS WITH OTHER ARCHITECTURAL FEATURES LOCATED AT
THE CEILING, MAY OBSTRUCT OR SKEW THE PLANNED FIRE SPRINKLER WATER
DISTRIBUTION PATTERN THROUGH POSSIBLY DELAY OR ACCELERATE THE
ACTIVATION OF THE SPRINKLER OR FIRE DETECTION SYSTEMS BY CHANNELING
HEAT FROM A FIRE EITHER TOWARD OR AWAY FROM THE DEVICE. DESIGNERS
AND INSTALLERS ARE ADVISED TO CONSULT A FIRE PROTECTION ENGINEER,
NFPA 13, OR THEIR LOCAL CODES FOR GUIDANCE WHERE AUTOMATIC FIRE
DETECTION AND SUPPRESSION SYSTEMS ARE PRESENT.
f. COORDINATION OF WORK: COORDINATE ACOUSTICAL CEILING WORK WITH
INSTALLERS OF RELATED WORK INCLUDING, BUT NOT LIMITED TO BUILDING
INSULATION, GYPSUM BOARD, LIGHT FIXTURES, MECHANICAL SYSTEMS,
ELECTRICAL SYSTEMS, AND SPRINKLERS.
E. DELIVERY, STORAGE AND HANDLING
a. DELIVER ACOUSTICAL CEILING UNITS TO PROJECT SITE IN ORIGINAL, UNOPENED
PACKAGES AND STORE THEM IN A FULLY ENCLOSED SPACE WHERE THEY WILL BE
PROTECTED AGAINST DAMAGE FROM MOISTURE, DIRECT SUNLIGHT, SURFACE
CONTAMINATION, AND OTHER CAUSES.
b. BEFORE INSTALLING ACOUSTICAL CEILING UNITS, PERMIT THEM TO REACH
ROOM TEMPERATURE AND A STABILIZED MOISTURE CONTENT.
c. HANDLE ACOUSTICAL CEILING UNITS CAREFULLY TO AVOID CHIPPING EDGES OR
DAMAGED UNITS IN ANY WAY.
F. PROJECT CONDITIONS
a. SPACE ENCLOSURE: STANDARD CEILINGS: DO NOT INSTALL INTERIOR CEILINGS
UNTIL SPACE IS ENCLOSED AND WEATHERPROOF; WET WORK IN PLACE IS
COMPLETED AND NOMINALLY DRY; WORK ABOVE CEILINGS IS COMPLETE; AND
AMBIENT CONDITIONS OF TEMPERATURE AND HUMIDITY ARE CONTINUOUSLY
MAINTAINED AT VALUES NEAR THOSE INTENDED FOR FINAL OCCUPANCY.
BUILDING AREAS TO RECEIVE CEILINGS SHALL BE FREE OF CONSTRUCTION DUST
AND DEBRIS.
H. MAINTENANCE
a. EXTRA MATERIALS: DELIVER EXTRA MATERIALS TO OWNER. FURNISH EXTRA
MATERIALS DESCRIBED BELOW THAT MATCH PRODUCTS INSTALLED. PACKAGED
WITH PROTECTIVE COVERING FOR STORAGE AND IDENTIFIED WITH APPROPRIATE
LABELS.
b. ACOUSTICAL CEILING UNITS: FURNISH QUALITY OF FULL-SIZE UNITS EQUAL TO
5.0 PERCENT OF AMOUNT INSTALLED.
c. EXPOSED SUSPENSION SYSTEM COMPONENTS: FURNISH QUANTITY OF EACH
EXPOSED SUSPENSION COMPONENT EQUAL TO 2.0 PERCENT OF AMOUNT
INSTALLED.
I. PRODUCTS
a. MANUFACTURERS
• CEILING PANELS, SUSPENSION SYSTEMS, PERIMETER SYSTEMS:
1. ARMSTRONG WORLD INDUSTRIES, INC. -VERIFY IN FIELD
PRIOR TO BID
K. ACOUSTICAL CEILING UNITS
a. ACOUSTICAL PANELS -VERIFY IN FIELD PRIOR TO BID
b. METAL SUSPENSION SYSTEMS -VERIFY IN FIELD PRIOR TO BID
c. COMPONENTS: MAIN BEAMS AND CROSS TEES, BASE METAL AND END DETAIL,
FABRICATED FROM COMMERCIAL QUALITY HOT DIPPED GALVANIZED STEEL COMPLYING
WITH ASTM A 653. MAIN BEAMS AND CROSS TEES ARE DOUBLE-WEB STEEL
CONSTRUCTION WITH TYPE EXPOSED FLANGE DESIGN. EXPOSED SURFACES
CHEMICALLY CLEANSED, CAPPING PREFINISHED GALVANIZED STEEL IN BAKED POLYESTER
PAINT. MAIN BEAMS AND CROSS TEES SHALL HAVE ROTARY STITCHING.
d. STRUCTURAL CLASSIFICATION: ASTM C 635 HEAVY DUTY DUTY
e. COLOR: WHITE AND MATCH THE ACTUAL COLOR OF THE SELECTED CEILING TILE,
UNLESS NOTED OTHERWISE.
f. SUSTAINABILITY: ENVIRONMETAL PRODUCT DECLARATION (EPD), HEALTH PRODUCT
DECLARATION (HPD)
g. ACCEPTABLE PRODUCT: PRELUDE XL 15/16" EXPOSED TEE AS MANUFACTURED BY
ARMSTRONG WORLD INDUSTRIES
h. ATTACHMENT DEVICES: SIZE FOR FIVE TIMES DESIGN LOAD INDICATED IN ASTM C 635,
TABLE 1, DIRECT HUNG UNLESS OTHERWISE INDICATED.
i. WIRE FOR HANGERS AND TIES: ASTM A 641, CLASS 1 ZINC COATING, SOFT ANNEALED,
WITH A YIELD STRESS LOAD OF AT LEAST TIME THREE DESIGN LOAD, BUT NOT LESS THAN
12 GAUGE.
• EDGE MOLDINGS AND TRIM:
1. 7800 -12' WALL MOLDING (NEW)
L. EXAMINATION: DO NOT PROCEED WITH INSTALLATION UNTIL ALL WET WORK SUCH AS
CONCRETE, TERRAZZO, PLASTERING AND PAINTING HAS BEEN COMPLETED AND THOROUGHLY
DRIED OUT, UNLESS EXPRESSLY PERMITTED BY MANUFACTURER'S PRINTED RECOMMENDATIONS.
(EXCEPTION: HUMIGUARD MAX CEILINGS)
M. PREPARATION
a. MEASURE EACH CEILING AREA AND ESTABLISH LAYOUT OF ACOUSTICAL UNITS TO
BALANCE BORDER WIDTHS AT OPPOSITE EDGES OF EACH CEILING. AVOID USE OF LESS
THAN HALF WIDTH UNITS AT BORDERS, AND COMPLY WITH REFLECTED CEILING PLANS.
COORDINATE PANEL LAYOUT WITH MECHANICAL AND ELECTRICAL FIXTURES.
b. COORDINATION: FURNISH LAYOUTS FOR PRESET INSERTS, CLIPS, AND OTHER CEILING
ANCHORS WHOSE INSTALLATION IS SPECIFIED IN OTHER SECTIONS.
c. FURNISH CONCRETE INSERTS AND SIMILAR DEVICES TO OTHER TRADES FOR
INSTALLATION WELL IN ADVANCE OF TIME NEEDED FOR COORDINATION OF OTHER
WORK.
N. INSTALLATION
a. FOLLOW MANUFACTURER INSTALLATION INSTRUCTIONS.
b. INSTALL SUSPENSION SYSTEM AND PANELS IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS, AND IN COMPLIANCE WITH ASTM C 636 AND WITH
THE AUTHORITIES HAVING JURISDICTION.
c. SUSPEND MAIN BEAM FROM OVERHEAD CONSTRUCTION WITH HANGER WIRES SPACED
4-0 ON CENTER ALONG THE LENGTH OF THE MAIN RUNNER. INSTALL HANGER WIRES
PLUMB AND STRAIGHT.
d. INSTALL WALL MOLDINGS AT INTERSECTION OF SUSPENDED CEILING AND VERTICAL
SURFACES. MITER CORNERS WHERE WALL MOLDINGS INTERSECT OR INSTALL CORNER
CAPS.
e. FOR REVEAL EDGE PANELS: CUT AND REVEAL OR RABBET EDGES OF CEILING PANELS AT
BORDER AREAS AND VERTICAL SURFACES.
f. INSTALL ACOUSTICAL PANELS IN COORDINATION WITH SUSPENDED SYSTEM,WITH
EDGES RESTING ON FLANGES OF MAIN RUNNER AND CROSS TEES. CUT AND FIT
PANELS NEATLY AGAINST ABUTTING SURFACES. SUPPORT EDGES BY WALL MOLDINGS.
O. ADJUSTING AND CLEANING
a. REPLACE DAMAGED AND BROKEN PANELS.
b. CLEAN EXPOSED SURFACES OF ACOUSTICAL CEILINGS, INCLUDING TRIM, EDGE
MOLDINGS, AND SUSPENSION MEMBERS. COMPLY WITH MANUFACTURER'S
INSTRUCTIONS FOR CLEANING AND TOUCH UP OF MINOR FINISH DAMAGE. REMOVE
ANY CEILING PRODUCTS THAT CANNOT BE SUCCESSFULLY CLEANED AND OR REPAIRED.
REPLACE WITH ATTIC STOCK OR NEW PRODUCT TO ELIMINATE EVIDENCE OF DAMAGE.
c. BEFORE DISPOSING OF CEILINGS, CONTACT THE ARMSTRONG RECYCLING CENTER AT
877-276-7876, SELECT OPTION #1 THEN #8 TO REVIEW WITH A CONSULTANT THE
CONDITION AND LOCATION OF BUILDING WHERE THE CEILINGS WILL BE REMOVED.
THE CONSULTANT WILL VERIFY THE CONDITION OF THE MATERIAL AND THAT IT MEETS
THE ARMSTRONG REQUIREMENTS FOR RECYCLING. THE ARMSTRONG CONSULTANT
WITH PROVIDE ASSISTANCE TO FACILITATE THE RECYCLE OF THE CEILING.
9.5 RESILIENT WALL BASE AND ACCESSORIES
A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
B. SAMPLES: SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH MATERIAL SPECIFIED INDICATING
VISUAL CHARACTERISTICS AND FINISH. INCLUDE RANGE SAMPLES IF VARIATION OF FINISH IS
ANTICIPATED.
C. SUBMIT EXTRA STOCK EQUAL TO 2% OF TOTAL USED.
D. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
E. PERFORMANCE: FIRE PERFORMANCE MEETING REQUIREMENTS OF BUILDING CODE AND
LOCAL AUTHORITIES.
F. RESILIENT WALL BASE:
1. MANUFACTURERS: AS SELECTED BY CONTRACTOR
2. STANDARD: ASTM F 1861.
3. TYPE: TP
4. HEIGHT: 2.5 INCHES.
G. COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. INSTALL IN
PROPER RELATION TO ADJACENT WORK.
H. INSTALL BASE AND ACCESSORIES TO MINIMIZE JOINTS. INSTALL BASE WITH JOINTS AS FAR
FROM CORNERS AS PRACTICAL.
I. CLEAN, POLISH, AND PROTECT.
D.DELIVERY, STORAGE AND HANDLING
A. GENERAL: COMPLY WITH REQUIREMENTS IN DIVISION 1
B. ORDERING: COMPLY WITH MANUFACTURER’S ORDERING AND LEAD-TIME
REQUIREMENTS TO AVOID CONSTRUCTION DELAYS
C. DELIVERY: DELIVER MATERIALS IN MANUFACTURER’S ORIGINAL, UNOPENED,
UNDAMAGED CONTAINERS WITH IDENTIFICATION LABELS INTACT
D. STORAGE AND PROTECTION: MATERIAL SHALL BE STORED IN AREAS THAT ARE
ENCLOSED AND WEATHER TIGHT WITH THE PERMANENT HVAC SYSTEM SET AT A
TEMPERATURE OF 65-85 DEGREES FAHRENHEIT (18° TO 29° CELSIUS) FOR A
MINIMUM OF 48 HOURS PRIOR TO COMMENCEMENT OF INSTALLATION
E.PROJECT CONDITIONS
A. ENVIRONMENTAL REQUIREMENTS/CONDITIONS: IN ACCORDANCE WITH
MANUFACTURER’S RECOMMENDATIONS, AREAS TO RECEIVE FLOOR COVERING
SHALL BE CLEAN, FULLY ENCLOSED AND WEATHER TIGHT WITH PERMANENT HVAC
SYSTEM SET TO 65-85 DEGREES FAHRENHEIT (18° TO 29° CELSIUS) FOR 48 HOURS
BEFORE INSTALLATION, DURING INSTALLATION AND FOR 48 HOURS AFTER
INSTALLATION
B. THE TEMPERATURE OF THE SPACE SHALL BE KEPT AT A MINIMUM OF 50° FAHRENHEIT
(10° CELSIUS) CONTINUALLY AFTER INSTALLATION. THE FLOOR COVERING MATERIAL
AND ADHESIVE SHALL BE CONDITIONED IN THE SAME MANNER. EXISTING
CONDITIONS: (SPECIFY EXISTING CONDITIONS AFFECTING PRODUCT USE AND
INSTALLATION)
C. EXISTING FLOOR SHALL BE CLEANED, PATCHED, REPAIRED, AND LEVELED AS
REQUIRED PER MANUFACTURER -VERIFY FLOOR CONDITION IN FIELD PRIOR TO
BID
F.SEQUENCING AND SCHEDULING
A. FINISHING OPERATIONS: INSTALL FLOOR COVERING AFTER FINISHING
OPERATIONS; INCLUDING PAINTING AND CEILING OPERATIONS HAVE BEEN
COMPLETED
B. CONCRETE CURING AND DRYING: DO NOT INSTALL FLOOR COVERING OVER
CONCRETE SUBSTRATES UNTIL SUBSTRATES HAVE CURED AND ARE DRY TO BOND
WITH ADHESIVE AS DETERMINED IN TEST METHODS SPECIFIED IN ASTM F710
G.WARRANTY
A. MANUFACTURER’S MATERIALS WARRANTY: SUBMIT, FOR OWNER’S ACCEPTANCE,
MANUFACTURER’S STANDARD WARRANTY DOCUMENT
B. MANUFACTURER’S WARRANTY IS IN ADDITION TO, AND NOT A LIMITATION OF,
OTHER RIGHTS OWNER MAY HAVE UNDER CONTRACT DOCUMENTS.
1. TOTAL WARRANTY PERIOD: 12 YEAR LIMITED WARRANTY
COMMENCING ON THE DATE OF SUBSTANTIAL COMPLETION.
2. FOR MATERIALS: 1 YEAR FROM DATE OF SUBSTANTIAL
COMPLETION INCLUDING 100% LABOR COSTS
3. FOR SURFACE WEAR 12 YEARS FROM THE DATE OF SUBSTANTIAL
COMPLETION INCLUDING PRO-RATED LABOR COSTS (SEE
WARRANTY FOR DETAILS)
H.MAINTENANCE
A. EXTRA MATERIALS: DELIVER TO THE OWNER EXTRA MATERIALS AS THE PRODUCTS TO BE
INSTALLED. ACKAGE PRODUCTS WITH PROTECTIVE COVERING OR IN ORIGINAL CARTONS
AND IDENTIFY WITH DESCRIPTIVE LABELS. COMPLY WITH DIVISION 1 CLOSEOUT SUBMITTALS
(MAINTENANCE MATERIALS) SECTION
1. QUANTITY: FURNISH QUANTITY OF FLOOR COVERING MATERIAL EQUAL
TO 5% OF THE AMOUNT TO BE INSTALLED
2. DELIVERY, STORAGE AND PROTECTION: COMPLY WITH THE OWNER’S
REQUIREMENTS FOR DELIVERY, STORAGE AND PROTECTION OF EXTRA
MATERIALS
B. MAINTENANCE OF FINISHED FLOOR COVERING SHALL BE ACCORDING TO MILLIKEN
MAINTENANCE INSTRUCTIONS
A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
B. SAMPLES: SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH MATERIAL SPECIFIED INDICATING
VISUAL CHARACTERISTICS AND FINISH. INCLUDE RANGE SAMPLES IF VARIATION OF FINISH IS
ANTICIPATED.
C. SEAMING LAYOUT: SUBMIT PROPOSED SEAMING LAYOUT.
D. EXTRA STOCK: SUBMIT EXTRA STOCK EQUAL TO 2% OF TOTAL USED.
E. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
F. PERFORMANCE: FIRE PERFORMANCE MEETING REQUIREMENTS OF BUILDING CODE AND
LOCAL AUTHORITIES.
G. CARPET MATERIAL:
1. MANUFACTURERS: AS SELECTED BY CONTRACTOR
2. MATERIAL: AS SELECTED.
3. INSTALLATION METHOD: DIRECT GLUE DOWN.
4. AUXILIARY MATERIALS:
a. EDGE GUARDS.
b. ADHESIVES, CEMENTS AND FASTENERS.
c. LEVELING COMPOUND.
H. COMPLY WITH RECOMMENDATIONS OF CARPET AND RUG INSTITUTE 'SPECIFIER'S HANDBOOK'.
I. PREPARE SURFACES AND INSTALL MATERIALS IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS AND APPROVED SUBMITTALS. INSTALL MATERIALS IN PROPER RELATION WITH
ADJACENT CONSTRUCTION AND WITH UNIFORM APPEARANCE. COORDINATE WITH WORK OF
OTHER SECTIONS. EXISTING FLOOR SHALL BE CLEANED, PATCHED, REPAIRED, AND LEVELED
AS REQUIRED PER MANUFACTURER -VERIFY FLOOR CONDITION IN FIELD PRIOR TO BID
J. INSTALL EDGE GUARDS AND REDUCER STRIPS AS REQUIRED; CLEAN AND PROTECT.
9.4 SHEET CARPET AND FLOOR PREPARATION
9.3 LUXURY VINYL TILE AND PLANK
A.SECTION INCLUDES: SOLID VINYL FLOOR TILE
B.SUBMITTALS
A. PRODUCT DATA: SUBMIT PRODUCT DATA, INCLUDING MANUFACTURER’S
SPECIFICATION SUMMARY SHEET FOR SPECIFIED PRODUCTS
B. MANUFACTURERS CERTIFICATIONS:
1. PROVIDE MANUFACTURER’S FACTORY LOCATION FOR THE SPECIFIED
PRODUCT(S)
2. PROVIDE ISO 9001 CERTIFICATION AND/OR 14001 CERTIFICATION
C.SHOP DRAWINGS: SUBMIT SHOP DRAWINGS SHOWING LAYOUT, SEAMING
DIAGRAM, FINISH COLORS, DESIGNS AND TEXTURES
D.SAMPLES: SUBMIT 6”SELECTION AND VERIFICATION SAMPLES FOR FINISHES,
COLORS, DESIGNS AND TEXTURES
E.QUALITY ASSURANCE SUBMITTALS: SUBMIT THE FOLLOWING:
1.TEST REPORTS: CERTIFIED TEST REPORTS SHOWING COMPLIANCE WITH
SPECIFIED PERFORMANCE CHARACTERISTICS AND PHYSICAL PROPERTIES
C. QUALITY ASSURANCE
A. REGULATORY REQUIREMENTS:
a. FIRE PERFORMANCE CHARACTERISTICS: PROVIDE RESILIENT PLANK AND/OR
TILE FLOORING WITH THE FOLLOWING FIRE PERFORMANCE
CHARACTERISTICS AS DETERMINED BY TESTING IN ACCORDANCE WITH
ASTM METHODS INDICATED BELOW BY A CERTIFIED TESTING LABORATORY
OR TESTING AND INSPECTING AGENCY ACCEPTABLE TO AUTHORITIES
HAVING JURISDICTION
b. CRITICAL RADIANT FLUX CLASS 1 RATING PER ASTM E 648
c. SMOKE DENSITY; LESS THAN 450 PER ASTM E 662
B. SINGLE SOURCE RESPONSIBILITY: OBTAIN VINYL FLOOR COVERING AND ADHESIVE
FROM A SINGLE SUPPLIER
C. MANUFACTURER QUALIFICATIONS:
1. ISO 9001 CERTIFIED
2. ISO 14001 CERTIFIED
3. OHSAS 18001 CERTIFIED
4. AT LEAST TEN YEARS’ACTIVE EXPERIENCE IN THE MANUFACTURE
AND MARKETING OF COMMERCIAL FLOORING
D.INSTALLER QUALIFICATIONS:
1. INSTALLER QUALIFICATIONS: INSTALLER EXPERIENCED IN PERFORMING
WORK OF THIS SECTION WHO HAS SPECIALIZED IN INSTALLING WORK
SIMILAR TO THAT REQUIRED FOR THIS PROJECT
2. AT LEAST FIVE YEARS’EXPERIENCE IN THE INSTALLATION OF RESILIENT
FLOORING
3. EXPERIENCE ON AT LEAST FIVE PROJECTS OF SIMILAR SIZE, TYPE AND
COMPLEXITY OF CURRENT PROJECT
4. EMPLOYER OF TRADESMEN FOR CURRENT PROJECT WHO ARE COMPETENT
IN TECHNIQUES REQUIRED BY MANUFACTURER FOR RESILIENT FLOORING
INSTALLATION INDICATED
9.6 PAINTING AND STAINING
E. INSTALLER QUALIFICATIONS: A FIRM OR INDIVIDUAL EXPERIENCED IN APPLYING PAINTS AND
COATINGS SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO THOSE INDICATED FOR THIS
PROJECT, WHOSE WORK HAS RESULTED IN APPLICATIONS WITH A RECORD OF SUCCESSFUL
IN-SERVICE PERFORMANCE.
F. PAINT EXPOSED SURFACES. IF A COLOR OF FINISH, OR A SURFACE IS NOT SPECIFICALLY
MENTIONED, ARCHITECT WILL SELECT FROM STANDARD PRODUCTS, COLORS, AND SHEENS
AVAILABLE.
G. DO NOT PAINT PREFINISHED ITEMS, CONCEALED SURFACES, FINISHED METAL SURFACES,
OPERATING PARTS, AND LABELS UNLESS INDICATED.
H. DELIVERY: DELIVER MANUFACTURER'S UNOPENED CONTAINERS TO THE WORK SITE. PACKAGING
SHALL BEAR THE MANUFACTURER'S NAME, LABEL, AND THE FOLLOWING LIST OF
INFORMATION.
1. PRODUCT NAME, AND TYPE (DESCRIPTION).
2. APPLICATION AND USE INSTRUCTIONS.
3. SURFACE PREPARATION.
4. VOC CONTENT.
5. ENVIRONMENTAL HANDLING.
6. BATCH DATE.
7. COLOR NUMBER.
I. STORAGE: STORE AND DISPOSE OF SOLVENT-BASED MATERIALS, AND MATERIALS USED WITH
SOLVENT-BASED MATERIALS, IN ACCORDANCE WITH REQUIREMENTS OF LOCAL
AUTHORITIES HAVING JURISDICTION.STORE MATERIALS IN AN AREA THAT IS WITHIN THE
ACCEPTABLE TEMPERATURE RANGE, PER MANUFACTURER'S INSTRUCTIONS. PROTECT FROM
FREEZING.
J. HANDLING: MAINTAIN A CLEAN, DRY STORAGE AREA, TO PREVENT CONTAMINATION OR DAMAGE
TO THE COATINGS.
K. PROJECT CONDITIONS: MAINTAIN ENVIRONMENTAL CONDITIONS (TEMPERATURE, HUMIDITY, AND
VENTILATION) WITHIN LIMITS RECOMMENDED BY MANUFACTURER FOR OPTIMUM RESULTS.
DO NOT INSTALL PRODUCTS UNDER ENVIRONMENTAL CONDITIONS OUTSIDE
MANUFACTURER'S RECOMMENDED LIMITS.
L. EXTRA MATERIALS: FURNISH EXTRA PAINT MATERIALS FROM THE SAME PRODUCTION RUN AS THE
MATERIALS APPLIED AND, IN THE QUANTITIES, DESCRIBED BELOW. PACKAGE WITH
PROTECTIVE COVERING FOR STORAGE AND IDENTIFY WITH LABELS DESCRIBING CONTENTS.
DELIVER EXTRA MATERIALS TO OWNER. FURNISH OWNER WITH AN ADDITIONAL ONE
PERCENT OF EACH MATERIAL AND COLOR, BUT NOT LESS THAN 1 GAL (3.8 L) OR 1 CASE, AS
APPROPRIATE.
M. ACCEPTABLE MANUFACTURER: SHERWIN-WILLIAMS, WHICH IS LOCATED AT: 101 PROSPECT AVE.;
CLEVELAND, OH 44115; ASD TOLL FREE TEL: 800-524-5979; TEL: 216-566-2000; FAX:
440-826-1989; EMAIL: REQUEST INFOSPECIFICATIONS@SHERWIN.COM;
WEB:WWW.SWSPECS.COM. REQUESTS FOR SUBSTITUTIONS WILL BE CONSIDERED IN
ACCORDANCE WITH THE PROVISIONS OF SECTION 01 60 00 -PRODUCT REQUIREMENTS.
N. INTERIOR PAINT AND COATING SYSTEMS: CONCRETE, METAL, WOOD, DRYWALL
O. EXTERIOR PAINT AND COATING SYSTEMS: PLASTER, METAL, WOOD
P. PAINT MATERIALS -GENERAL:UNLESS OTHERWISE INDICATED, PROVIDE FACTORY-MIXED
COATINGS. WHEN REQUIRED, MIX COATINGS TO CORRECT CONSISTENCY IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS BEFORE APPLICATION.DO NOT
REDUCE, THIN, OR DILUTE COATINGS OR ADD MATERIALS TO COATINGS UNLESS SUCH
PROCEDURE IS SPECIFICALLY DESCRIBED IN MANUFACTURER'S PRODUCT INSTRUCTIONS.
FOR OPAQUE FINISHES, TINT EACH COAT INCLUDING PRIMER COAT AND INTERMEDIATE
COATS, ONE-HALF SHADE LIGHTER THAN SUCCEEDING COAT, WITH FINAL FINISH COAT AS
BASE COLOR. OR FOLLOW MANUFACTURES PRODUCT INSTRUCTIONS FOR OPTIMAL COLOR
CONFORMANCE.
Q. PRIMERS: WHERE THE MANUFACTURER OFFERS OPTIONS ON PRIMERS FOR A PARTICULAR
SUBSTRATE, USE A PRIMER CATEGORIZED AS "BEST" BY THE MANUFACTURER.
R.COATING APPLICATION ACCESSORIES: PROVIDE ALL PRIMERS, SEALERS,CLEANING AGENTS,
CLEANING CLOTHS, SANDING MATERIALS, AND CLEAN-UP MATERIALS REQUIRED, PER
MANUFACTURER'S SPECIFICATIONS.
S. COLOR: REFER TO FINISH SCHEDULE FOR PAINT COLORS, AND AS SELECTED.
T. INTERIOR PAINT AND COATING SYSTEMS (LEED-V4 AND V4.1 NC/CI/CS COMPLIANT)
A. WOOD: DOORS, AND TRIM.
1. LATEX SYSTEMS:
A. SEMI -GLOSS FINISH:
1) 1ST COAT: S-W MULTI-PURPOSE INT./EXT PRIMER/SEALER, B51-450
(4 MILS. WET, 1.44 MILS. DRY PER COAT).
2) 2ND COAT: S-W PRO INDUSTRIAL ACRYLIC SEMI-GLOSS, B66-650
SERIES.
3) 3RD COAT: S-W PRO INDUSTRIAL ACRYLIC SEMI-GLOSS, B66-650
SERIES (2.0-4.0 MILS. DRY PER COAT).
G. EXTERIOR COMPOSITION BOARD (HARDBOARD): SOME COMPOSITION BOARDS MAY
EXUDE A WAXY MATERIAL THAT MUST BE REMOVED WITH A SOLVENT PRIOR TO COATING.
WHETHER FACTORY PRIMED OR UNPRIMED, EXTERIOR COMPOSITION BOARD SIDING
(HARDBOARD) MUST BE CLEANED THOROUGHLY AND PRIMED WITH AN ALKYD PRIMER.
H. DRYWALL -EXTERIOR: MUST BE CLEAN AND DRY. ALL NAIL HEADS MUST BE SET AND
SPACKLED. JOINTS MUST BE TAPED AND COVERED WITH A JOINT COMPOUND. SPACKLED
NAIL HEADS AND TAPE JOINTS MUST BE SANDED SMOOTH, AND ALL DUST REMOVED PRIOR
TO PAINTING. EXTERIOR SURFACES MUST BE SPACKLED WITH EXTERIOR GRADE
COMPOUNDS.
I. DRYWALL -INTERIOR: MUST BE CLEAN AND DRY. ALL NAIL HEADS MUST BE SET AND
SPACKLED. JOINTS MUST BE TAPED AND COVERED WITH A JOINT COMPOUND. SPACKLED
NAIL HEADS AND TAPE JOINTS MUST BE SANDED SMOOTH, AND ALL DUST REMOVED PRIOR
TO PAINTING.
J. GALVANIZED METAL: CLEAN PER SSPC-SP1 USING DETERGENT AND WATER OR A
DEGREASING CLEANER TO REMOVE GREASES AND OILS. APPLY TO A TEST AREA, PRIMING AS
REQUIRED. ALLOW THE COATING TO DRY AT LEAST ONE WEEK BEFORE TESTING. IF
ADHESION IS POOR, BRUSH BLAST PER SSPC-SP16 IS NECESSARY TO REMOVE THESE
TREATMENTS.
K. PLASTER: MUST BE ALLOWED TO DRY THOROUGHLY FOR AT LEAST 30 DAYS BEFORE
PAINTING UNLESS THE PRODUCTS ARE DESIGNED TO BE USED IN HIGH PH ENVIRONMENTS.
ROOM MUST BE VENTILATED WHILE DRYING; IN COLD, DAMP WEATHER, ROOMS MUST BE
HEATED. DAMAGED AREAS MUST BE REPAIRED WITH APPROPRIATE PATCHING MATERIAL. BARE
PLASTER MUST BE CURED AND HARD. TEXTURED, SOFT, POROUS, OR POWDERY PLASTER
SHOULD BE TREATED WITH A SOLUTION OF 1 PINT HOUSEHOLD VINEGAR TO 1 GALLON OF
WATER. REPEAT UNTIL THE SURFACE IS HARD, RINSE WITH CLEAR WATER AND ALLOW TO DRY.
L. STEEL: STRUCTURAL, PLATE, AND SIMILAR ITEMS: SHOULD BE CLEANED BY ONE OR MORE
OF THE SURFACE PREPARATIONS DESCRIBED BELOW. THESE METHODS ARE USED
THROUGHOUT THE WORLD FOR DESCRIBING METHODS FOR CLEANING STRUCTURAL STEEL.
VISUAL STANDARDS ARE AVAILABLE THROUGH THE SOCIETY OF PROTECTIVE COATINGS. A
BRIEF DESCRIPTION OF THESE STANDARDS TOGETHER WITH NUMBERS BY WHICH THEY CAN
BE SPECIFIED FOLLOW.
1. SOLVENT CLEANING, SSPC-SP1: SOLVENT CLEANING IS A METHOD FOR
REMOVING ALL VISIBLE OIL, GREASE, SOIL, DRAWING AND CUTTING COMPOUNDS,
AND OTHER SOLUBLE CONTAMINANTS. SOLVENT CLEANING DOES NOT REMOVE
RUST OR MILL SCALE. CHANGE RAGS AND CLEANING SOLUTION FREQUENTLY SO
THAT DEPOSITS OF OIL AND GREASE ARE NOT SPREAD OVER ADDITIONAL AREAS IN
THE CLEANING PROCESS. BE SURE TO ALLOW ADEQUATE VENTILATION.
2. HAND TOOL CLEANING, SSPC-SP2: HAND TOOL CLEANING REMOVES ALL
LOOSE MILL SCALE, LOOSE RUST, AND OTHER DETRIMENTAL FOREIGN MATTER. IT IS
NOT INTENDED THAT ADHERENT MILL SCALE, RUST, AND PAINT BE REMOVED BY
THIS PROCESS. BEFOREHAND TOOL CLEANING, REMOVE VISIBLE OIL, GREASE,
SOLUBLE WELDING RESIDUES, AND SALTS BY THE METHODS OUTLINED IN SSPC-SP1.
3. POWER TOOL CLEANING, SSPC-SP3: POWER TOOL CLEANING REMOVES
ALL LOOSE MILL SCALE, LOOSE RUST, AND OTHER DETRIMENTAL FOREIGN MATTER.
IT IS NOT INTENDED THAT ADHERENT MILL SCALE, RUST, AND PAINT BE REMOVED BY
THIS PROCESS. BEFORE POWER TOOL CLEANING, REMOVE VISIBLE OIL, GREASE,
SOLUBLE WELDING RESIDUES, AND SALTS BY THE METHODS OUTLINED IN SSPC-SP1.
4. WHITE METAL BLAST CLEANING, SSPC-SP5 OR NACE 1: A WHITE METAL
BLAST CLEANED SURFACE, WHEN VIEWED WITHOUT MAGNIFICATION, SHALL BE
FREE OF ALL VISIBLE OIL, GREASE, DIRT, DUST, MILL SCALE, RUST, PAINT, OXIDES,
CORROSION PRODUCTS, AND OTHER FOREIGN MATTER. BEFORE BLAST CLEANING,
VISIBLE DEPOSITS OF OIL OR GREASE SHALL BE REMOVED BY ANY OF THE METHODS
SPECIFIED IN SSPC-SP1 OR OTHER AGREED UPON METHODS.
5. COMMERCIAL BLAST CLEANING, SSPC-SP6 OR NACE 3: A COMMERCIAL
BLAST CLEANED SURFACE, WHEN VIEWED WITHOUT MAGNIFICATION, SHALL BE
FREE OF ALL VISIBLE OIL, GREASE, DIRT, DUST, MILL SCALE, RUST, PAINT, OXIDES,
CORROSION PRODUCTS, AND OTHER FOREIGN MATTER, EXCEPT FOR STAINING.
STAINING SHALL BE LIMITED TO NO MORE THAN 33 PERCENT OF EACH SQUARE
INCH OF SURFACE AREA AND MAY CONSIST OF LIGHT SHADOWS, SLIGHT STREAKS,
OR MINOR DISCOLORATION CAUSED BY STAINS OF RUST, STAINS OF MILL SCALE,
OR STAINS OF PREVIOUSLY APPLIED PAINT. BEFORE BLAST CLEANING, VISIBLE
DEPOSITS OF OIL OR GREASE SHALL BE REMOVED BY ANY OF THE METHODS
SPECIFIED IN SSPC-SP1 OR OTHER AGREED UPON METHODS.
6. BRUSH-OFF BLAST CLEANING, SSPC-SP7 OR NACE 4: A BRUSH-OFF BLAST
CLEANED SURFACE, WHEN VIEWED WITHOUT MAGNIFICATION, SHALL BE FREE OF
ALL VISIBLE OIL, GREASE, DIRT, DUST, LOOSE MILL SCALE, LOOSE RUST, AND LOOSE
PAINT. TIGHTLY ADHERENT MILL SCALE, RUST, AND PAINT MAY REMAIN ON THE
SURFACE. BEFORE BLAST CLEANING, VISIBLE DEPOSITS OF OIL OR GREASE SHALL BE
REMOVED BY ANY OF THE METHODS SPECIFIED IN SSPC-SP 1 OR OTHER AGREED
UPON METHODS.
7. POWER TOOL CLEANING TO BARE METAL, SSPC-SP11: METALLIC SURFACES
THAT ARE PREPARED ACCORDING TO THIS SPECIFICATION, WHEN VIEWED
WITHOUT MAGNIFICATION, SHALL BE FREE OF ALL VISIBLE OIL, GREASE,DIRT, DUST,
MILL SCALE, RUST, PAINT, OXIDE CORROSION PRODUCTS, AND OTHER FOREIGN
MATTER. SLIGHT RESIDUES OF RUST AND PAINT MAY BE LEFT IN THE LOWER
PORTIONS OF PITS IF THE ORIGINAL SURFACE IS PITTED. PRIOR TO POWER TOOL
SURFACE PREPARATION, REMOVE VISIBLE DEPOSITS OF OIL OR GREASE BY ANY OF
THE METHODS SPECIFIED IN SSPC-SP1, SOLVENT CLEANING, OR OTHER AGREED
UPON METHODS.
8. NEAR-WHITE BLAST CLEANING, SSPC-SP10 OR NACE 2: A NEAR WHITE
BLAST CLEANED SURFACE, WHEN VIEWED WITHOUT MAGNIFICATION, SHALL BE
FREE OF ALL VISIBLE OIL, GREASE, DIRT, DUST, MILL SCALE, RUST, PAINT, OXIDES,
CORROSION PRODUCTS, AND OTHER FOREIGN MATTER, EXCEPT FOR STAINING.
STAINING SHALL BE LIMITED TO NO MORE THAN 5 PERCENT OF EACH SQUARE
INCH OF SURFACE AREA AND MAY CONSIST OF LIGHT SHADOWS, SLIGHT STREAKS,
OR MINOR DISCOLORATION CAUSED BY STAINS OF RUST, STAINS OF MILL SCALE,
OR STAINS OF PREVIOUSLY APPLIED PAINT. BEFORE BLAST CLEANING, VISIBLE
DEPOSITS OF OIL OR GREASE SHALL BE REMOVED BY ANY OF THE METHODS
SPECIFIED IN SSPC-SP1 OR OTHER AGREED UPON METHODS.
9. HIGH-AND ULTRA-HIGH PRESSURE WATER JETTING FOR STEEL AND OTHER
HARD MATERIALS: SSPC-SP12 OR NACE 5: THIS STANDARD PROVIDES
REQUIREMENTS FOR THE USE OF HIGH-AND ULTRA-HIGH PRESSURE WATER
JETTING TO ACHIEVE VARIOUS DEGREES OF SURFACE CLEANLINESS. THIS
STANDARD IS LIMITED IN SCOPE TO THE USE OF WATER ONLY WITHOUT THE
ADDITION OF SOLID PARTICLES IN THE STREAM.
10. WATER BLASTING, SSPC-SP12/NACE NO. 5: REMOVAL OF OIL GREASE DIRT,
LOOSE RUST, LOOSE MILL SCALE, AND LOOSE PAINT BY WATER AT PRESSURES OF
2,000 TO 2,500 PSI AT A FLOW OF 4 TO 14 GALLONS PER MINUTE.
M. VINYL SIDING, ARCHITECTURAL PLASTICS, EIFS AND FIBERGLASS: CLEAN VINYL
SIDING THOROUGHLY BY SCRUBBING WITH A WARM, SOAPY WATER SOLUTION. RINSE
THOROUGHLY. DO NOT PAINT VINYL SIDING WITH ANY COLOR DARKER THAN THE
ORIGINAL COLOR UNLESS THE PAINT SYSTEM FEATURES SHERWIN-WILLIAMS VINYLSAFE
TECHNOLOGY. PAINTING WITH DARKER COLORS THAT ARE NOT SHERWIN-WILLIAMS
VINYLSAFE MAY CAUSE SIDING TO WARP. FOLLOW ALL PAINTING GUIDELINES OF THE VINYL
MANUFACTURER WHEN PAINTING. ONLY PAINT PROPERLY INSTALLED VINYL SIDING.
DEVIATING FROM THE MANUFACTURER'S PAINTING GUIDELINES MAY CAUSE THE WARRANTY
TO BE VOIDED.
N. STUCCO: MUST BE CLEAN AND FREE OF ANY LOOSE STUCCO. IF RECOMMENDED
PROCEDURES FOR APPLYING STUCCO ARE FOLLOWED, AND NORMAL DRYING CONDITIONS
PREVAIL, THE SURFACE MAY BE PAINTED IN 30 DAYS. THE PH OF THE SURFACE SHOULD BE
BETWEEN 6 AND 9 UNLESS THE PRODUCTS ARE DESIGNED TO BE USED IN HIGH PH
ENVIRONMENTS SUCH AS LOXON.
O. WOOD: MUST BE CLEAN AND DRY. PRIME AND PAINT AS SOON AS POSSIBLE.
KNOTS AND PITCH STREAKS MUST BE SCRAPED, SANDED, AND SPOT PRIMED BEFORE A FULL
PRIMING COAT IS APPLIED. PATCH ALL NAIL HOLES AND IMPERFECTIONS WITH A WOOD
FILLER OR PUTTY AND SAND SMOOTH.
Z. INSTALLATION:
A. APPLY ALL COATINGS AND MATERIALS WITH THE MANUFACTURER'S SPECIFICATIONS IN
MIND. MIX AND THIN COATINGS ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
B. DO NOT APPLY IT TO WET OR DAMP SURFACES. WAIT AT LEAST 30 DAYS BEFORE APPLYING
TO NEW CONCRETE OR MASONRY. OR FOLLOW MANUFACTURER'S PROCEDURES TO APPLY
APPROPRIATE COATINGS PRIOR TO 30 DAYS. TEST NEW CONCRETE FOR MOISTURE
CONTENT. WAIT UNTIL WOOD IS FULLY DRY AFTER RAIN OR MORNING FOG OR DEW.
C. APPLY COATINGS USING METHODS RECOMMENDED BY MANUFACTURER.
D. UNIFORMLY APPLY COATINGS WITHOUT RUNS, DRIPS, OR SAGS, WITHOUT BRUSH MARKS,
AND WITH CONSISTENT SHEEN.
E. APPLY COATINGS AT SPREADING RATE REQUIRED TO ACHIEVE THE MANUFACTURERS
RECOMMENDED DRY FILM THICKNESS.
F. REGARDLESS OF THE NUMBER OF COATS SPECIFIED, APPLY AS MANY COATS AS
NECESSARY FOR COMPLETE HIDE, AND UNIFORM APPEARANCE.
G. INSPECTION: THE COATED SURFACE MUST BE INSPECTED AND APPROVED BY THE
ARCHITECT JUST PRIOR TO THE APPLICATION OF EACH COAT.
AA. PROTECTION: PROTECT FINISHED COATINGS FROM DAMAGE UNTIL COMPLETION OF PROJECT.
TOUCH-UP DAMAGED COATINGS AFTER SUBSTANTIAL COMPLETION, FOLLOWING MANUFACTURER'S
RECOMMENDATION FOR TOUCH UP OR REPAIR OF DAMAGED COATINGS. REPAIR ANY DEFECTS
THAT WILL HINDER THE PERFORMANCE OF THE COATINGS.
12 FURNISHINGS
A. PROVIDE INTERIOR SIGNAGE PER ALL LOCAL AND STATE CODE REQUIREMENTS, INCLUDING
ROOM IDENTIFICATION.
B. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
C. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS INDICATING MATERIAL CHARACTERISTICS,
DETAILS OF CONSTRUCTION, CONNECTIONS, AND RELATIONSHIP WITH ADJACENT
CONSTRUCTION.
D. SAMPLES: SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH MATERIAL SPECIFIED
INDICATING VISUAL CHARACTERISTICS AND FINISH. INCLUDE RANGE SAMPLES IF
VARIATION OF FINISH IS ANTICIPATED.
E. QUALITY ASSURANCE: COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE
PRODUCTS OF ACCEPTABLE MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN
SIMILAR SERVICE FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND
STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
F. MATERIALS -VERIFY EXISTING SYSTEM IN FIELD AND MATCH FOR ALL NEW SIGNAGE
TYPE: UNFRAMED.
MATERIAL: PLASTIC.
LETTERING: RAISED
G.INSTALL MATERIALS AND SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS
AND APPROVED SUBMITTALS. INSTALL MATERIALS AND SYSTEMS IN PROPER RELATION WITH
ADJACENT CONSTRUCTION AND WITH UNIFORM APPEARANCE. COORDINATE WITH WORK
OF OTHER SECTIONS.
H.RESTORE DAMAGED FINISHES. CLEAN AND PROTECT WORK FROM DAMAGE.
12.1 INTERIOR SIGNAGE
8.3 HOLLOW METAL DOORS & FRAMES
PART 1 GENERAL
1.1 SUMMARY
A. PROVIDE STEEL DOORS AND FRAMES.
1.2 SUBMITTALS
A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
B. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS INDICATING MATERIAL CHARACTERISTICS,
DETAILS OF CONSTRUCTION, CONNECTIONS, AND RELATIONSHIP WITH ADJACENT
CONSTRUCTION.
1.3 QUALITY ASSURANCE
A. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF
ACCEPTABLE MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE
FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS
IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
B. STANDARDS: ANSI/SDI-100, RECOMMENDED SPECIFICATIONS FOR STANDARD STEEL
DOORS AND FRAMES.
C. PERFORMANCE STANDARDS:
THERMAL-RATED ASSEMBLIES AT EXTERIOR: ASTM C 236 OR ASTM C 976.
PART 2 PRODUCTS
2.1 MATERIALS
A. EXTERIOR STEEL DOORS:
1. MANUFACTURERS: AS SELECTED BY GENERAL CONTRACTOR
2. MATERIAL: MINIMUM 16 GAUGE GALVANIZED STEEL SHEET.
3. DOOR THICKNESS: 1-3/4 INCHES, THERMALLY INSULATED.
4. FINISH: FACTORY PRIMED AND FIELD PAINTED.
5. ACCESSORIES:
C. SILENCERS.
B. EXTERIOR STEEL FRAMES:
1. TYPE: KNOCKDOWN.
2. FINISH: FACTORY PRIMED AND FIELD PAINTED.
PART 3 EXECUTION
3.1 INSTALLATION
A. FABRICATE WORK TO BE RIGID, NEAT AND FREE FROM SEAMS, DEFECTS, DENTS, WARP,
BUCKLE, AND EXPOSED FASTENERS. INSTALL DOORS AND FRAMES IN COMPLIANCE WITH
SDI-100, NFPA 80, AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.
B. PROVIDE THERMALLY IMPROVED DOORS WITH MAXIMUM U-VALUE OF 0.24 BTU/HR./SQ.
FT. DEGREE F (ASTM C 236) FOR ALL EXTERIOR DOORS AND ELSEWHERE AS NOTED.
C. PROVIDE ACOUSTICALLY IMPROVED DOORS WITH MINIMUM STC OF 33 (ASTM E 90 AND
ASTM E 413) WHERE INDICATED.
D. HARDWARE: PREPARE DOORS AND FRAMES TO RECEIVE HARDWARE ON FINAL
SCHEDULE. PROVIDE FOR 3 SILENCERS ON SINGLE DOORFRAMES; 2 ON DOUBLE
DOORFRAMES.
E. SHOP FINISH: CLEAN, TREAT AND PRIME PAINT ALL WORK WITH RUST-INHIBITING PRIMER
COMPARABLE WITH FINISH PAINT SPECIFIED IN DIVISION 9 SECTION. PROVIDE ASPHALT
EMULSION SOUND DEADENING COATING ON CONCEALED FRAME INTERIORS.
F. TOUCH-UP DAMAGED COATINGS READY TO RECEIVE FINISH PAINTING.
9.0 FINISHES
8.2 INTERIOR SOLID WOOD DOORS
A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
B. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS INDICATING MATERIAL CHARACTERISTICS,
DETAILS OF CONSTRUCTION, CONNECTIONS, AND RELATIONSHIP WITH ADJACENT
CONSTRUCTION.
C. WARRANTY: SUBMIT MANUFACTURER'S STANDARD WARRANTY. INCLUDE LABOR AND
MATERIALS TO REPAIR OR REPLACE DEFECTIVE MATERIALS.
1. WARRANTY PERIOD: LIFE OF INSTALLATION
D. OPERATION AND MAINTENANCE DATA: SUBMIT MANUFACTURER'S OPERATION AND
MAINTENANCE DATA, INCLUDING OPERATING INSTRUCTIONS, LIST OF SPARE PARTS AND
MAINTENANCE SCHEDULE.
E. QUALITY STANDARDS: AWI'S 'ARCHITECTURAL WOODWORK STANDARDS.
F. INTERIOR FLUSH WOOD DOORS:
1.TYPE: SOLID CORE.
2.THICKNESS: 1-3/4 INCHES THICK.
4.FRAMES: HOLLOW METAL.
5.FACE: PAINT-GRADE MDF AT ALL PAINTED DOORS; WOOD VENEER TO MATCH
EXISTING ADJACENT AT ALL WOOD VENEER DOORS - VERIFY SPEC IN FIELD PRIOR TO
BID
6.FINISH: SEE DOOR SCHEDULE
G. COMPLY WITH NWMA I.S. 1A AND SPECIFIED QUALITY STANDARD.
H.PREFIT DOORS TO FRAMES. PREMACHINE DOORS FOR HARDWARE LISTED ON FINAL
SCHEDULES. FACTORY BEVEL DOORS.
I. INSTALL DOORS WITH NOT MORE THAN 1/8 INCH CLEARANCE AT TOP AND SIDES, 1/4 INCH AT
BOTTOM. COMPLY WITH NFPA 80 FOR RATED ASSEMBLIES.
J. ADJUST, CLEAN, AND PROTECT.
AH: ADJUSTMENT, CLEANING, AND DEMONSTRATING: PRIOR TO FINAL ADJUSTMENTS, THE
HVAC SYSTEM MUST BE COMPLETED AND BALANCED. TEST THAT ALL OPENINGS MEET ANSI
A117.1 FOR CLOSER OPENING PRESSURE, CLOSING SPEED, LATCHING, AND HARDWARE
OPERATING FORCES. REPLACE ITEMS THAT CANNOT BE ADJUSTED TO OPERATE FREELY AND
SMOOTHLY OR AS INTENDED FOR APPLICATION. PRIOR TO FINAL WALK-THROUGH INSPECTION,
CLEAN ADJACENT SURFACES SOILED BY HARDWARE INSTALLATION. CLEAN FINISH HARDWARE PER
MANUFACTURER’S INSTRUCTIONS AFTER FINAL ADJUSTMENTS HAVE BEEN MADE. REMOVE ALL
PROTECTION AND REPLACE ITEMS THAT CANNOT BE CLEANED TO MANUFACTURER’S LEVEL OF
FINISH QUALITY. DEMONSTRATION AND TRAINING WILL BE CONDUCTED AS PER THE
FOLLOWING SESSIONS. ALL SESSIONS WILL BE RECORDED AND TURNED OVER TO THE OWNER
FOR FUTURE USE.
1. HARDWARE MAINTENANCE: CONDUCT A TRAINING CLASS FOR BUILDING
MAINTENANCE PERSONNEL DEMONSTRATING THE ADJUSTMENT, OPERATION, AND
MAINTENANCE OF ALL HARDWARE. SPECIAL TOOLS FOR FINISH HARDWARE TO BE
TURNED OVER AND DEMONSTRATED USAGE AT THE MEETING.
2. KEY CONTROL SYSTEM: TRAIN THE OWNER’S DESIGNATED REPRESENTATIVE ON THE KEY
CONTROL SYSTEM DEMONSTRATING THE PERMANENT FILE KEYS, DUPLICATE LOANER
KEYS, KEY RECEIPTS, KEY ENVELOPES, KEY CHANGE IDENTIFICATION SHEETS, BITTING
LISTS, TAGS, AND LABELS. WHEN KEY MANAGEMENT SOFTWARE IS PROVIDED TRAINING
WILL BE PROVIDED FOR THE SETUP AND USAGE OF THE SOFTWARE.
AI: PROTECTION: LEAVE MANUFACTURER’S PROTECTIVE FILM INTACT AND, PROTECT EXIT
DEVICES, LOCKS, AND SURFACE MOUNTED HARDWARE WITH KRAFT PAPER OR BUBBLE WRAP.
COVER FIRE LABELS AT PAINTED PRODUCTS THAT BEAR A LABEL WITH MAGNETIC OR MASKING
TAPE. KEEP PROTECTION IN PLACE UNTIL TIME OF FINAL CLEANING AND ADJUSTMENT.
AJ: HARDWARE SET SCHEDULE: DOOR HARDWARE ITEMS HAVE BEEN PLACED IN SETS WHICH ARE
INTENDED TO BE A GUIDE OF DESIGN, GRADE, QUALITY, FUNCTION, OPERATION, AND
PERFORMANCE. REVIEW PRODUCTS THAT MAY REQUIRE MOUNTING ACCESSORIES TO MEET
DOOR, FRAME, AND SWING CONDITIONS AS THESE FINAL DETAILS VARY FROM MANUFACTURER
TO MANUFACTURER AND PROVIDE AS REQUIRED. WHERE ADDITIONAL ITEMS OF HARDWARE ARE
REQUIRED FOR COMPLETION OF THE WORK, A WRITTEN STATEMENT OF SUCH OMISSION,
ERROR, OR OTHER DISCREPANCY IS REQUIRED TO BE SUBMITTED TO THE ARCHITECT, PRIOR TO
BID DATE FOR CLARIFICATION VIA AN ADDENDUM. ABBREVIATIONS LISTED BELOW DO NOT
APPEAR IN THE MANUFACTURER’S LITERATURE, FOR ANY OTHER ABBREVIATIONS REFER TO
MANUFACTURER’S LITERATURE:
a. LDW = LESS THAN DOOR WIDTH
b. LAR = LENGTH AS REQUIRED
c. QTY = QUANTITY
d. CTC = CENTERLINE TO CENTERLINE
e. BTB = BACK-TO-BACK MOUNTING.
AK: HARDWARE SCHEDULE - SEE DOOR SCHEDULE
AB. LATCH PROTECTORS
A. LATCH PROTECTORS OF ONE MANUFACTURER AS LISTED FOR CONTINUITY OF DESIGN AND
CONSIDERATION OF WARRANTY.
B.STANDARDS: MANUFACTURER TO BE LISTED BY THE FOLLOWING: AUXILIARY HARDWARE:
ANSI/BHMA A156.16.
C. DESIGN:
1. 12-GAUGE STEEL, STAINLESS STEEL MATERIAL.
2. SIZE: 3” X 11”.
3. NON-HANDED.
4. FRAME PIN PREVENTS PRYING OF DOOR.
5. USE WITH 1-3/4” THICK DOOR.
6. USE WITH CYLINDRICAL LOCKSETS WITH A 2-3/4” BACKSET AT EXTERIOR OUT-SWINGING
DOORS.
7. FASTENERS: TWO 5/16-20 X 1-1/2” CARRIAGE BOLTS WITH SEX NUTS.
AC. SILENCERS
A. WHERE SMOKE, LIGHT, OR WEATHER SEAL ARE NOT REQUIRED, PROVIDE THREE SILENCERS
PER SINGLE DOOR FRAME, TWO PER DOUBLE DOOR FRAME AND FOUR PER DUTCH DOOR
FRAME.
B.PRODUCTS TO BE CERTIFIED AND LISTED BY THE FOLLOWING:
1. AUXILIARY HARDWARE: ANSI/BHMA A156.16
AD: APPEARANCE OF FINISHED WORK: VARIATIONS IN APPEARANCE OF ABUTTING OR ADJACENT
PIECES ARE ACCEPTABLE IF WITHIN RANGE OF APPROVED SAMPLES. NOTICEABLE VARIATIONS IN
THE SAME PIECE ARE NOT ACCEPTABLE. VARIATIONS IN APPEARANCE OF OTHER COMPONENTS
ARE ACCEPTABLE IF THEY ARE WITHIN RANGE OF APPROVED SAMPLES. COMPLY WITH BASE
MATERIAL AND FINISH REQUIREMENTS INDICATED BY ANSI/BHMA A156.18 DESIGNATIONS IN
HARDWARE SCHEDULE.
AE: EXAMINATION: EXAMINE DOORS AND FRAMES, WITH INSTALLERS PRESENT, FOR COMPLIANCE
WITH REQUIREMENTS FOR INSTALLATION TOLERANCES, LABELED FIRE-RATED CONSTRUCTION,
WALL AND FLOOR CONSTRUCTION, AND OTHER CONDITIONS AFFECTING PERFORMANCE.
WHERE HARDWARE WILL BE INSTALLED DIRECTLY ON WALLS INSPECT APPLICATIONS FOR
BLOCKING MATERIAL OF SUFFICIENT TYPE AND SIZE FOR HARDWARE. WHERE EXISTING
PRODUCTS WILL BE REUSED, EXAMINE EXISTING DOOR AND FRAME SIZES, PREPS, SWINGS,
RATINGS, AND COMPARE TO THE SPECIFIED HARDWARE FOR COMPATIBILITY AND
FUNCTIONALITY. THE HARDWARE SET SPECIFIED SHOULD ACT AS GUIDE FOR DESIGN AND
FUNCTION. PROVIDE FILLER PLATES AS NEEDED TO FILL AND REPAIR EXISTING MATERIALS. TEST
ANY EXISTING TO REMAIN HARDWARE FOR FUNCTIONALITY AND VISUALLY INSPECT FOR
DAMAGE. NOTE ANY DEFECTIVE OR DAMAGED PRODUCTS AS WELL AS NOTING ANY CODE
DEFICIENCIES AND SUBMIT ISSUES AND ESTIMATED COSTS FOR DIRECTION OF HOW TO
PROCEED WITH REPAIR OR REPLACEMENT. NOTIFY ARCHITECT VIA A PREPARED WRITTEN REPORT
AND ENDORSED BY INSTALLER OF ANY DISCREPANCIES BETWEEN THE DOOR SCHEDULE, DOOR
TYPES, DRAWINGS, AND SCHEDULED HARDWARE. LIST CONDITIONS DETRIMENTAL TO
APPLICATION, TO THE PROPER AND TIMELY COMPLETION OF THE WORK AND PERFORMANCE OF
THE HARDWARE. PROCEED ONLY AFTER SUCH DISCREPANCIES OR CONFLICTS HAVE BEEN
RESOLVED IN WRITING.
AF: INSTALLATION: INSTALL HARDWARE USING MANUFACTURERS’ RECOMMENDED FASTENERS
AND INSTALLATION INSTRUCTIONS, AT HEIGHT LOCATIONS AND CLEARANCE TOLERANCES THAT
COMPLY WITH:
1. NFPA 80
2. NFPA 105
3. ICC/ANSI A117.1
4. DHI PUBLICATION – INSTALLATION GUIDE FOR DOORS AND HARDWARE
5. APPROVED SHOP DRAWINGS
6. APPROVED HARDWARE SCHEDULE
INSTALL SOFFIT MOUNTED GASKETS PRIOR TO OTHER SOFFIT MOUNTED HARDWARE
ENSURING A CONTINUOUS SEAL AROUND THE PERIMETER OF THE OPENING WITHOUT
CUTTING OR NOTCHING. LOCATE SURFACE MOUNTED DOOR CLOSERS ON STAIRWELL SIDE
OF STAIR DOORS, INTERIOR SIDE OF EXTERIOR OPENINGS, OR ON THE ROOM SIDE OF
OPENINGS, UNLESS IT IS A STERILE ROOM. LOCATE WALL MOUNTED BUMPER TO CONTACT
THE OPERATING TRIM. VERIFY THAT PUSHBUTTONS OF LOCKSETS DO NOT CONTACT THE
STOP AND INADVERTENTLY LOCK THE DOOR. MOUNT ARMOR, MOP, AND KICK PLATES FLUSH
WITH THE BOTTOM OF THE DOOR AND CENTERED HORIZONTALLY ON THE DOOR. NOTCH
THRESHOLDS WITH NO LARGER THAN A 1/32-INCH GAP MATCHING THE FRAME PROFILE. SET
IN A FULL BED OF SEALANT COMPLYING WITH REQUIREMENTS SPECIFIED IN DIVISION 07
SECTION “JOINT SEALANTS” FORMING A TIGHT SEAL BETWEEN THRESHOLD AND MOUNTING
SURFACE. CAULK AND SEAL THE ENTIRE PERIMETER TO PREVENT WATER LEAKAGE. REMOVE
EXCESS SEALANTS IMMEDIATELY AND CLEAN THE AREA THOROUGHLY. DO NOT INSTALL
SURFACE MOUNTED ITEMS UNTIL FINISHES HAVE BEEN COMPLETED ON SUBSTRATES INVOLVED.
SET UNIT LEVEL, PLUMB AND TRUE TO LINE LOCATION.
AG: FIELD QUALITY CONTROL: SCHEDULE A FINAL WALK THROUGH TO INSPECT HARDWARE
INSTALLATION TEN (10) BUSINESS DAYS BEFORE FINAL ACCEPTANCE OF THE OWNER. VISUALLY
INSPECT FOR PROPER FASTENERS AND VERIFY THAT DOORS OPEN, CLOSE, LATCH PROPERLY, AND
THAT OPENINGS ARE INSTALLED TO MEET NFPA 80 AND ANSI A117.1 REQUIREMENTS. CORRECT
DEFICIENCIES, INCLUDING MISSING HARDWARE IMMEDIATELY. PROVIDE A WRITTEN REPORT
DETAILING DISCREPANCIES OF EACH OPENING WITHIN FIVE (5) BUSINESS DAYS OF THE WALK
THROUGH. PRIOR TO RECEIVING CERTIFICATE OF OCCUPANCY HAVE DOORS INSPECTED BY A
CERTIFIED FIRE AND EGRESS DOOR ASSEMBLY INSPECTOR (CFDAI), AS CERTIFIED BY INTERTEK (ITS),
SUBMIT A WRITTEN REPORT TO THE OWNER AND CONTRACTOR. DOORS FAILING INSPECTION
MUST BE ADJUSTED, MODIFIED, OR REPLACED TO BE WITHIN APPROPRIATE CODE REQUIREMENTS
WITHOUT DELAY.
B. DRYWALL: WALLS, CEILINGS, GYPSUM BOARD, AND SIMILAR ITEMS.
1. LATEX SYSTEMS:
A. EG-SHEL / SATIN FINISH (EVERYWHERE UNO):
1) 1ST COAT: S-W PROMAR 200 ZERO VOC INTERIOR LATEX PRIMER,
B28W2600 (4 MILS. WET, 1.5 MILS. DRY PER COAT).
2) 2ND COAT: S-W PROMAR 200 ZERO VOC LATEX EG-SHEL,
B20-2600 SERIES.
3) 3RD COAT: S-W PROMAR 200 ZERO VOC LATEX EG-SHEL,
B20-2600 SERIES (4 MILS. WET, 1.7 MILS. DRY PER COAT).
B. EG-SHEL FINISH SCUFF RESISTANT WATERBASE ENAMEL (AT YOUTH ROOM):
1) 1ST COAT: SHERWIN-WILLIAMS PROMAR 200 ZERO VOC INTERIOR
LATEX PRIMER, B28W2600 (4 MILS. WET, 1.5 MILS. DRY PER COAT).
2) 2ND COAT: SHERWIN-WILLIAMS SCUFF TUFF INT. WATERBASED
ENAMEL, EG-SHEL, S24-150 SERIES.
3) 3RD COAT: SHERWIN-WILLIAMS SCUFF TUFF INT. WATERBASED
ENAMEL, EG-SHEL, S24-150 SERIES (4 MILS. WET, 1.2 MILS. DRY PER COAT).
C. METAL: MISCELLANEOUS AND ORNAMENTAL IRON, STRUCTURAL IRON, AND FERROUS
METAL.
1. LATEX SYSTEMS:
A. EG-SHEL / SATIN FINISH HIGH PERFORMANCE:
1) 1ST COAT: S-W PRO INDUSTRIAL PRO-CRYL UNIVERSAL
PRIMER, B66-1310 SERIES (5.0 MILS. WET, 2.0 MILS. DRY PER
COAT).
2) 2ND COAT: S-W PRO INDUSTRIAL ACRYLIC EG-SHEL,
B66-660 SERIES.
3) 3RD COAT: S-W PRO INDUSTRIAL ACRYLIC EG-SHEL,
B66-660 SERIES (2.0-4.0 MILS. DRY PER COAT).
V. EXTERIOR PAINT AND COATING SYSTEMS
A. METAL
1. ALKYD SYSTEMS; WATERBASED:
A. SEMI-GLOSS FINISH (VERIFY / MATCH FINISH OF METAL PANELS :
1) 1ST COAT: S-W PRO INDUSTRIAL PRO-CRYL UNIVERSAL PRIMER,
B66-1310 SERIES (5.0 MILS. WET, 2.0 MILS. DRY PER COAT).
2) 2ND COAT: S-W PRO INDUSTRIAL WATERBASED ALKYD URETHANE
ENAMEL SEMI-GLOSS, B53-1150 SERIES.
3) 3RD COAT: S-W PRO INDUSTRIAL WATERBASED ALKYD URETHANE
ENAMEL SEMI-GLOSS, B53-1150 SERIES (4.0-5.0 MILS. WET, 1.4 -1.7 MILS.
DRY PER COAT).
B. CONCRETE
1. LATEX SYSTEMS:
A. SATIN FINISH:
1) 1ST COAT: S-W A-100 EXTERIOR LATEX SATIN, A82 SERIES.
2) 2ND COAT: S-W A-100 EXTERIOR LATEX SATIN, A82 SERIES.
3) 3RD COAT: S-W A-100 EXTERIOR LATEX SATIN, A82 SERIES (4.0 MILS.
WET, 1.5 MILS. DRY PER COAT).
X. EXAMINATION: DO NOT BEGIN INSTALLATION UNTIL THE SUBSTRATES HAVE BEEN PROPERLY
PREPARED; NOTIFY ARCHITECT OF UNSATISFACTORY CONDITIONS BEFORE PROCEEDING. IF
SUBSTRATE PREPARATION IS THE RESPONSIBILITY OF ANOTHER INSTALLER, NOTIFY
ARCHITECT OF UNSATISFACTORY PREPARATION BEFORE PROCEEDING. PROCEED WITH
WORK ONLY AFTER CONDITIONS HAVE BEEN CORRECTED AND APPROVED BY ALL PARTIES,
OTHERWISE APPLICATION OF COATINGS WILL BE CONSIDERED AS AN ACCEPTANCE OF
SURFACE CONDITIONS. PREVIOUSLY PAINTED SURFACES: VERIFY THAT EXISTING PAINTED
SURFACES DO NOT CONTAIN LEAD BASED PAINTS, NOTIFY ARCHITECT IMMEDIATELY IF LEAD
BASED PAINTS ARE ENCOUNTERED.
Y. SURFACE PREPARATION:
A. GENERAL: SURFACES SHALL BE DRY AND IN SOUND CONDITION. REMOVE OIL, DUST,
DIRT, LOOSE RUST, PEELING PAINT, OR OTHER CONTAMINATION TO ENSURE GOOD
ADHESION.
1. PRIOR TO ATTEMPTING TO REMOVE MILDEW, IT IS RECOMMENDED TO
TEST ANY CLEANER ON A SMALL, INCONSPICUOUS AREA PRIOR TO USE. BLEACH
AND BLEACHING TYPE CLEANERS MAY DAMAGE OR DISCOLOR EXISTING PAINT
FILMS. BLEACH ALTERNATIVE CLEANING SOLUTIONS ARE ADVISED.
2. REMOVE MILDEW BEFORE PAINTING BY WASHING WITH A SOLUTION OF 1
PART LIQUID HOUSEHOLD BLEACH AND 3 PARTS OF WARM WATER. APPLY
SOLUTION AND SCRUB THE MILDEWED AREA. ALLOW SOLUTION TO REMAIN ON
THE SURFACE FOR 10 MINUTES. RINSE THOROUGHLY WITH CLEAN WATER AND
ALLOW THE SURFACE TO DRY BEFORE PAINTING. WEAR PROTECTIVE GLASSES OR
GOGGLES, WATERPROOF GLOVES, AND PROTECTIVE CLOTHING. QUICKLY WASH
OFF ANY OF THE MIXTURE THAT COMES IN CONTACT WITH YOUR SKIN. DO NOT
ADD DETERGENTS OR AMMONIA TO THE BLEACH/WATER SOLUTION.
3. REMOVE ITEMS INCLUDING BUT NOT LIMITED TO THERMOSTATS,
ELECTRICAL OUTLETS, SWITCH COVERS AND SIMILAR ITEMS PRIOR TO PAINTING.
AFTER COMPLETING PAINTING OPERATIONS IN EACH SPACE OR AREA, REINSTALL
ITEMS REMOVED USING WORKERS SKILLED IN THE TRADES INVOLVED.
4. NO EXTERIOR PAINTING SHOULD BE DONE IMMEDIATELY AFTER A RAIN,
DURING FOGGY WEATHER, WHEN RAIN IS PREDICTED, OR WHEN THE TEMPERATURE
IS BELOW 50 DEGREES F (10 DEGREES C), UNLESS PRODUCTS ARE DESIGNED
SPECIFICALLY FOR THESE CONDITIONS. ON LARGE EXPANSES OF METAL SIDING,
THE AIR, SURFACE, AND MATERIAL TEMPERATURES MUST BE 50 DEGREES F (10
DEGREES F) OR HIGHER TO USE LOW TEMPERATURE PRODUCTS.
B. ALUMINUM: REMOVE ALL OIL, GREASE, DIRT, OXIDE, AND OTHER FOREIGN
MATERIAL BY CLEANING PER SSPC-SP1, SOLVENT CLEANING.
D. CONCRETE, SSPC-SP13 OR NACE 6: THIS STANDARD GIVES REQUIREMENTS FOR SURFACE
PREPARATION OF CONCRETE BY MECHANICAL, CHEMICAL, OR THERMAL METHODS PRIOR
TO THE APPLICATION OF BONDED PROTECTIVE COATING OR LINING SYSTEMS. THE
REQUIREMENTS OF THIS STANDARD ARE APPLICABLE TO ALL TYPES OF CEMENTITIOUS
SURFACES INCLUDING CAST-IN-PLACE CONCRETE FLOORS AND WALLS, PRECAST SLABS,
MASONRY WALLS, AND SHOTCRETE SURFACES. AN ACCEPTABLE PREPARED CONCRETE
SURFACE SHOULD BE FREE OF CONTAMINANTS, LAITANCE, LOOSELY ADHERING
CONCRETE, AND DUST, AND SHOULD PROVIDE A SOUND, UNIFORM SUBSTRATE SUITABLE
FOR THE APPLICATION OF PROTECTIVE COATING OR LINING SYSTEMS.
E. CEMENT COMPOSITION SIDING/PANELS: REMOVE ALL SURFACE CONTAMINATION BY
WASHING WITH AN APPROPRIATE CLEANER, RINSE THOROUGHLY AND ALLOW TO DRY.
EXISTING PEELED OR CHECKED PAINT SHOULD BE SCRAPED AND SANDED TO A SOUND
SURFACE. PRESSURE CLEAN, IF NEEDED, WITH A MINIMUM OF 2100 PSI PRESSURE TO
REMOVE ALL DIRT, DUST, GREASE, OIL, LOOSE PARTICLES, LAITANCE, FOREIGN MATERIAL,
AND PEELING OR DEFECTIVE COATINGS. ALLOW THE SURFACE TO DRY THOROUGHLY. THE
PH OF THE SURFACE SHOULD BE BETWEEN 6 AND 9 UNLESS THE PRODUCTS ARE DESIGNED
TO BE USED IN HIGH PH ENVIRONMENTS.
F. COPPER AND STAINLESS STEEL: REMOVE ALL OIL, GREASE, DIRT, OXIDE, AND OTHER
FOREIGN MATERIAL BY CLEANING PER SSPC-SP 2, HAND TOOL CLEANING.
A. PRODUCT DATA: FOR EACH PAINT SYSTEM INDICATED, INCLUDING.
1. PRODUCT CHARACTERISTICS.
2. SURFACE PREPARATION INSTRUCTIONS AND RECOMMENDATIONS.
3. PRIMER REQUIREMENTS AND FINISH SPECIFICATION.
4. STORAGE AND HANDLING REQUIREMENTS AND RECOMMENDATIONS.
5. APPLICATION METHODS.
B. SELECTION SAMPLES: FOR COLORS NOT SPECIFIED, SUBMIT A COMPLETE SET OF COLOR CHIPS
THAT REPRESENT THE FULL RANGE OF MANUFACTURER'S PRODUCTS, COLORS, AND SHEENS
AVAILABLE.
C. VERIFICATION SAMPLES: FOR EACH FINISHED PRODUCT SPECIFIED, SUBMIT SAMPLES THAT
REPRESENT THE ACTUAL PRODUCT, COLOR, AND SHEEN.
D. COATING MAINTENANCE MANUAL: UPON CONCLUSION OF PROJECT, THE CONTRACTOR OR
PAINT MANUFACTURER/SUPPLIER SHALL FURNISH A COATING MAINTENANCE MANUAL, SUCH
AS SHERWIN-WILLIAMS, "CUSTODIAN PROJECT COLOR AND PRODUCT INFORMATION"
REPORT OR EQUAL. MANUAL SHALL INCLUDE AN AREA SUMMARY WITH FINISH SCHEDULE,
AREA DETAIL DESIGNATING WHERE EACH PRODUCT/COLOR/FINISH WAS USED, PRODUCT
DATA PAGES, MATERIAL SAFETY DATA SHEETS, CARE AND CLEANING INSTRUCTIONS,
TOUCH-UP PROCEDURES, AND COLOR SAMPLES OF EACH COLOR AND FINISH USED.
F.SUBMIT THE FOLLOWING:
a. MAINTENANCE DATA: MAINTENANCE DATA FOR INSTALLED PRODUCTS IN
ACCORDANCE WITH DIVISION 1 SECTIONS. INCLUDE METHODS FOR
MAINTAINING INSTALLED PRODUCTS, AND PRECAUTIONS AGAINST
CLEANING MATERIALS AND METHODS DETRIMENTAL TO FINISHES AND
PERFORMANCE
b. WARRANTY: WARRANTY DOCUMENTS SPECIFIED HEREIN
c. QUALIFICATION DATA
1. FOR A QUALIFIED RESILIENT FLOORING INSTALLER SPECIFIED
HEREIN
C. SUBMITTALS
a. PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL DATA FOR EACH TYPE OF
ACOUSTICAL CEILING UNIT AND SUSPENSION SYSTEM REQUIRED.
b. SAMPLES: MINIMUM 6 INCH X 6 INCH SAMPLES OF SPECIFIED ACOUSTICAL
PANEL; 8 INCH LONG SAMPLES OF EXPOSED WALL MOLDING AND SUSPENSION
SYSTEM, INCLUDING MAIN RUNNER AND 4 FOOT CROSS TEES.
c. ACOUSTICAL CERTIFICATIONS: MANUFACTURER'S CERTIFICATIONS THAT
PRODUCTS COMPLY WITH SPECIFIED REQUIREMENTS, INCLUDING LABORATORY
REPORTS SHOWING COMPLIANCE WITH SPECIFIED TESTS AND STANDARDS. FOR
ACOUSTICAL PERFORMANCE, EACH CARTON OF MATERIAL MUST CARRY AN
APPROVED INDEPENDENT LABORATORY CLASSIFICATION OF NRC, CAC, AND AC.
8.1 DOOR HARDWARE (CONTINUED)
M. STEVEN
CAMP
C-18,407
JUN. 30, 2027
RENEWAL DATESTATEOFCALIFORNIA
LICENSED A RCHITECT
PROJECT ARCHITECT:
PROJECT MANAGER:
DRAWN BY:
PROJECT NUMBER:
All ideas, designs and plans indicated or represented
by these drawings are owned by and are the property
of Elements Architecture, Inc. and were created and
developed for use in connection with the specified
project. None of such ideas, designs, or plans shall
be used for any purpose whatsoever without the
written permission of Elements Architecture.
Elements Architecture, Inc.
PROJECT NAME:
NO.DESCRIPTION DATE
M. Steven Camp, AIA
Scott Holland, AIA
PROJECT ADDRESS:
SHELLEY MACDONALD
EA
SHELLEY MACDONALD
STAMPED/SIGNED: 04/08/2026
4/
9
/
2
0
2
6
7
:
5
2
:
5
7
A
M
21.105
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
A9.3
SPECIFICATIONS
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
BRANCH CIRCUIT
SIGNAL
LIGHTING & LIGHTING CONTROLS
ANNOTATIONS
POWERGENERAL NOTES
ELECTRICAL SHEET INDEX:
DEMO GENERAL NOTES
FIRE ALARM SYSTEM
TITLE 24 ACCEPTANCE TESTING
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
RE
G
I
STERED PROF E S S IONAL ENGI
NE
ER
ELECT R ICAL
No. E-21025R
Y
AN JOS E PH GA
L
A
ZExp. 03/31/27
SIGNED ON:
03-30-2026
MANDATORY MEASURES
ELECTRICAL SCOPE OF WORK:
STANDARD CONSTRUCTION NOTES:
ABBREVIATIONS
E0.1
LEGEND, SCHDULES,
GENERAL NOTES AND
ABBREVIATIONS
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
N
E
ER
ELECT R ICAL
No. E-21025R
Y
A
N JOS E PH GA
L
A
ZExp. 03/31/27
SIGNED ON:
03-30-2026
E0.2
DETAILS AND
SCHEDULES
RECEPTACLE VOLTAGE DROP CALCULATIONS
1
INSTALLATION OF UNDERGROUND CONDUITS
3
ROOF TOP GFCI MOUNTING DETAIL
6
TRAPEZE SUPPORT DETAIL
4
LIGHT FIXTURE SUPPORT DETAIL
5
SYSTEM GROUNDING DETAIL
7
WORKING AND DEDICATED SPACE DETAIL
2
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
N
E
ER
ELECT R ICAL
No. E-21025R
Y
A
N JOS E PH GA
L
A
ZExp. 03/31/27
SIGNED ON:
03-30-2026
ᄚ
Disclaimer
ᄚ
ᄚ
ᄚ
General System Notes
ᄚ ᄚ ᄚ ᄚ ᄚ ᄚ ᄚ ᄚ
nLight System Notes
ᄚ
nLIGHT SYSTEM RISERGENERAL LIGHTING CONTROL NOTES
13
4 2
nLIGHT TYPICAL ROOM WIRING nLIGHT SYMBOLS
E0.3
LIGHTING CONTROL
DETAILS
UP UP
UP
UP
UP
1 98765423
A
B
C
(E)
LOBBY
101
(E)
HALLWAY
102
(E)
MEETING
ROOM
103
(E)
MEETING
ROOM
104
(E)
MEETING
ROOM
105
(E)
MEETING
ROOM
106
STORAGE
107
(E) VOID
108
(E)
OFFICE
109
(E) I.T.
ROOM
110
(E)
MEETING
ROOM
111
(E)
LUNCH
ROOM
112
(E)
MEETING
ROOM
113
(E) JAN
114
(E) RR
115
(E) RR
116
NURSERY
117
NURSERY
118
(E)
LOBBY
119
(E)
AUDITORIUM
120
(E)
STORAGE
121
(E)
STORAGE
122
YOUTH
124
STORAGE
125
(E)
YOUTH
126
(E) F.R.
104A
(E)
ELECT
127
HALLWAY
123
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
ISTERED PROF E S S IONAL ENGI
N
E
ER
ELECT R ICAL
No. E-21025R
Y
A
N JOS E PH GA
L
A
ZExp. 03/31/27
SIGNED ON:
03-30-2026
GENERAL NOTES
DEMO LEGEND
E2.1
ELECTRICAL FIRST FLOOR
LIGHTING PLAN
ELECTRICAL FIRST FLOOR LIGHTING PLAN N
LIGHTING FIXTURE SCHEDULE PLAN NOTES
WH
FD
FD
UP UP
UP
UP
UP
1 98765423
A
B
C
(E)
LOBBY
101
(E)
HALLWAY
102
(E)
MEETING
ROOM
103
(E)
MEETING
ROOM
104
(E)
MEETING
ROOM
105
(E)
MEETING
ROOM
106
STORAGE
107
(E) VOID
108
(E)
OFFICE
109
(E) I.T.
ROOM
110
(E)
MEETING
ROOM
111
(E)
LUNCH
ROOM
112
(E)
MEETING
ROOM
113
(E) JAN
114
(E) RR
115
(E) RR
116
NURSERY
117
NURSERY
118
(E)
LOBBY
119
(E)
AUDITORIUM
120
(E)
STORAGE
121
(E)
STORAGE
122
YOUTH
124
STORAGE
125
(E)
YOUTH
126
(E) F.R.
104A
(E)
ELECT
127
HALLWAY
123
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
N
E
ER
ELECT R ICAL
No. E-21025R
Y
A
N JOS E PH GA
L
A
ZExp. 03/31/27
SIGNED ON:
03-30-2026
PLAN NOTES
POWER PLAN GENERAL NOTES
SIGNAL PLAN GENERAL NOTES
ELECTRICAL FIRST FLOOR POWER PLAN N
DEMO LEGEND
E3.1
ELECTRICAL FIRST FLOOR
POWER PLAN
1 98765423
A
B
C
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
ISTERED PROF E S S IONAL ENGI
N
E
ER
ELECT R ICAL
No. E-21025R
Y
A
N JOS E PH GA
L
A
ZExp. 03/31/27
SIGNED ON:
03-30-2026
PLAN NOTES
ROOF PLAN GENERAL NOTES
ELECTRICAL ROOF PLAN N
DEMO LEGEND
E3.3
ELECTRICAL ROOF PLAN
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
N
E
ER
ELECT R ICAL
No. E-21025R
Y
A
N JOS E PH GA
L
A
ZExp. 03/31/27
SIGNED ON:
03-30-2026
LOAD SUMMARY "MSB"
E4.1
SINGLE LINE DIAGRAMS
AND PANEL SCHEDULES
SHEET NOTESSINGLE LINE GENERAL NOTESGENERAL PANEL SCHEDULE NOTES
SPECIFIC PANEL NOTES
DEMO LEGEND
PANEL SCHEDULES
SINGLE LINE DIAGRAM
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
RE
G
I
STERED PROF E S S IONAL ENGI
NE
ER
ELECT R ICAL
No. E-21025R
Y
AN JOS E PH GA
L
A
ZExp. 03/31/27
SIGNED ON:
03-30-2026
E5.1
ELECTRICAL
SPECIFICATIONS
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
NE
ER
ELECT R ICAL
No. E-21025R
Y
A
N JOS E P H GA
L
A
ZExp. 03/31/27
SIGNED ON:
03-30-2026
E6.1
TITLE 24 COMPLIANCE
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CA L IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
NE
ER
MECHA N ICAL
No. M35663S
A
NYA PHA T CHARAKI
T
T
IExp. 09-30-27
SIGNED ON:
03-30-2026
MECHANICAL SHEET INDEX:
CAL GREEN GENERAL NOTES
ABBREVIATIONS
FIRE EXTINGUISHING SYSTEM NOTES
STANDARD CONSTRUCTION NOTES:
MECHANICAL SCOPE OF WORK:
LEGEND:GENERAL NOTES
ANNOTATIONS
ROOFTOP HEATPUMP A/C UNITS
M0.1
LEGEND, SCHEDULES,
GENERAL NOTES AND
ABBREVIATIONS
A/C CONDENSATE DRAIN
2
MANUAL VOLUME DAMPERS
3
DUCT MOUNTED SIDEWALL REGISTER
4
CEILING DIFFUSER
10
HEAT PUMP MOUNTING DETAIL
9
SUPPLY AIR SIDEWALL REGISTER WITH OBD
15
DETAIL
16
REDUCING WYE
6
LOCKING DAMPER QUADRANT
1
WOOD JOIST HANGERS
5
REDUCER
8
FLEXIBLE DUCT CONNECTION
12
HEMMED "S" SLIP
7
DRIVE SLIP
11
TAP-IN BRANCH
14
WOOD JOIST HANGERS
18
SHORT RADIUS 90° ELBOW
13
TRUSS JOIST HANGERS
17
TRUSS JOIST HANGERS
20
TRUSS JOIST HANGERS
19
DUCT HANGERS
24
DUCT HANGERS
23
DETAIL
21
DETAIL
22
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
NE
ER
MECHA N ICAL
No. M35663S
A
NYA PHA T CHARAK
I
T
T
IExp. 09-30-27
SIGNED ON:
03-30-2026
12" MIN.
M0.2
MECHANICAL DETAILS
UP UP
UP
UP
UP
1 98765423
A
B
C
PLAN NOTES
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
NE
ER
MECHA N ICAL
No. M35663S
A
NYA PHA T CHARAK
I
T
T
IExp. 09-30-27
SIGNED ON:
03-30-2026
DEMO LEGEND
MECHANICAL DEMO FIRST FLOOR PLAN N M2.0
MECHANICAL DEMO FIRST
FLOOR PLAN
UP UP
UP
UP
UP
1 98765423
A
B
C
(E)
LOBBY
101
(E)
HALLWAY
102
(E)
MEETING
ROOM
103
(E)
MEETING
ROOM
104
(E)
MEETING
ROOM
105
(E)
MEETING
ROOM
106
STORAGE
107
(E) VOID
108
(E)
OFFICE
109
(E) I.T.
ROOM
110
(E)
MEETING
ROOM
111
(E)
LUNCH
ROOM
112
(E)
MEETING
ROOM
113
(E) JAN
114
(E) RR
115
(E) RR
116
NURSERY
117
NURSERY
118
(E)
LOBBY
119
(E)
AUDITORIUM
120
(E)
STORAGE
121
(E)
STORAGE
122
YOUTH
124
STORAGE
125
(E)
YOUTH
126
(E) F.R.
104A
(E)
ELECT
127
HALLWAY
123
PLAN NOTES
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
NE
ER
MECHA N ICAL
No. M35663S
A
NYA PHA T CHARAK
I
T
T
IExp. 09-30-27
SIGNED ON:
03-30-2026
DEMO LEGEND
MECHANICAL FIRST FLOOR PLAN N M2.1
MECHANICAL FIRST
FLOOR PLAN
1 98765423
A
B
C
PLAN NOTES
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
NE
ER
MECHA N ICAL
No. M35663S
A
NYA PHA T CHARAK
I
T
T
IExp. 09-30-27
SIGNED ON:
03-30-2026
DEMO LEGEND
M3.1
MECHANICAL ROOF
PLAN
MECHANICAL ROOF PLAN N
ADD ALTERNATE NOTE
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
RE
G
I
STERED PROF E S S IONAL ENGI
NE
ER
MECHA N ICAL
No. M35663S
A
NYA PHA T CHARAKI
T
T
IExp. 09-30-27
SIGNED ON:
03-30-2026
M4.1
MECHANICAL
SPECIFICATIONS
PROJECT NAME:
NO.DESCRIPTION DATE
PROJECT ADDRESS:
TENANT
IMPROVEMENT
(PHASE 3)
2909 DAIMLER STREET
SANTA ANA, CA 92705
COMPASS BIBLE CHURCH,
TUSTIN SANTA ANA
P.O. BOX 6390 La Quinta, CA 92248
Website | www.mepesg.com
PLAN CHECK CORRECTIONS 03-29-26
STATE OF CAL IFORNIA
R
E
G
I
STERED PROF E S S IONAL ENGI
N
E
ER
MECHA N ICAL
No. M35663S
A
NYA PHA T CHARAKI
T
T
IExp. 09-30-27
SIGNED ON:
03-30-2026
M5.1
MECHANICAL TITLE 24
COMPLIANCE
THE CONTRACTOR SHALL CONFORM TO ALL STATE AND LOCAL LAWS GOVERNING THE
WORK AND OBTAIN ALL NECESSARY LICENSES AND PERMITS.
1.
2.
A.B. ANCHOR BOLT
ABV. ABOVE
BAR. REINF. BAR
BD. BOARD
BLK'G. BLOCKING
BLW. BELOW
BM. BEAM
B.N. BOUNDARY NAIL
B.O.B BOTTOM OF BEAM
BOTT. BOTTOM
B.W. BOTH WAYS
CANT.CANTILEVER
CJ. CEILING JOIST
COL. COLUMN
CONC. CONCRETE
CONT. CONTINUOUS
DBL. DOUBLE
D.F. DOUGLAS FIR
DIA. DIAMETER
(E) EXISTING
E.W. EACH WAY
E.J. EXPANSION JOINT
E.N. EDGE NAIL
EQ. EQUAL
E.O.R. ENGINEER OF RECORD
F.G. FINISH GRADE
F.J. FLOOR JOIST
FL. FLUSH
F.N. FIELD NAIL
F.O.C. FACE OF CONCRETE
F.O.M. FACE OF MASONRY
F.O.S. FACE OF STUDS
GA. GAUGE
GALV. GALVANIZED
ALL DIMENSIONS ON STRUCTURAL DRAWINGS SHALL BE CHECKED AGAINST
ARCHITECTURAL DIMENSIONS. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE OMITTED
OR NOT CLEAR, CONTACT THE ARCHITECT OR ENGINEER OF RECORD (E.O.R.) FOR
CLARIFICATIONS.
THE CONTRACTOR SHALL COMPARE THE STRUCTURAL DRAWINGS WITH ARCHITECTURAL,
PLUMBING, MECHANICAL, CIVIL AND ELECTRICAL DRAWINGS AS TO ALL LAYOUTS,
DIMENSIONS AND ELEVATIONS. ANY DISCREPANCIES SHALL BE REPORTED TO THE
ARCHITECT FOR PROPER ADJUSTMENT BEFORE PROCEEDING WITH THE WORK.
3.
SUBSTITUTION REQUESTS FOR MATERIALS SPECIFIED ON THE STRUCTURAL DRAWINGS
MAY BE CONSIDERED WITH MATERIALS HAVING EQUIVALENT OR GREATER CAPACITY AND
PERFORMANCE. CURRENT EVALUATION REPORTS AND PRODUCT INFORMATION SHALL BE
PROVIDED TO THE STRUCTURAL ENGINEER DEMONSTRATING THE REQUIRED CAPACITY
AND PERFORMANCE OF THE MATERIAL TO BE SUBSTITUTED. WRITTEN APPROVAL FROM
THE E.O.R SHALL BE OBTAINED PRIOR TO THE SUBSTITUTION OF ANY MATERIAL
SPECIFIED ON THE STRUCTURAL CONSTRUCTION DOCUMENTS.
4.
ANY DEVIATION, MODIFICATION & SUBSTITUTION FROM THE APPROVED SET OF
STRUCTURAL DRAWINGS SHALL BE SUBMITTED TO THE OWNER'S REPRESENTATIVE FOR
REVIEW/APPROVAL PRIOR TO ITS USE OR INCLUSION ON THE SHOP DRAWINGS & PRIOR
TO PROCEEDING WITH THE WORK.
5.
EXISTING CONDITIONS AS SHOWN ON THESE PLANS ARE FOR REFERENCE ONLY.
CONTRACTOR IS REQUIRED TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL REPORT CONDITIONS THAT CONFLICT WITH THE
CONTRACT DOCUMENTS TO THE OWNER'S REPRESENTATIVE. DO NOT DEVIATE FROM THE
CONTRACT DOCUMENTS WITHOUT WRITTEN DIRECTION FROM THE OWNER'S
REPRESENTATIVE.
6.
THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOAD
IMPOSED UPON THE STRUCTURE. CONSTRUCTION LOADS SHALL NOT EXCEED THE
DESIGN CAPACITY OF THE STRUCTURE AT THE TIME THE LOADS ARE IMPOSED.
7.
SPECIFICATIONS RELATED TO WATERPROOFING, INCLUDING BUT NOT LIMITED TO
MEMBRANES, WATERSTOPS, SEALANTS, FLASHING, VAPOR BARRIER, ARE AS SPECIFIED
BY ARCHITECT/WATER PROOFING CONSULTANT.
8.
FEATURES OF CONSTRUCTION SHOWN ARE TYPICAL AND SHALL APPLY GENERALLY
THROUGHOUT SIMILAR CONDITIONS. ALL DETAILS REFERENCED, AND DETAILS NOT
REFERENCED ON PLANS, SHALL BE CONSIDERED TYPICAL AND APPLY TO ALL SIMILAR
CONDITIONS OF THE CONSTRUCTION.
9.
UNLESS SHOWN OTHERWISE, DETAILS SHOWN ON "TYPICAL DETAIL" SHEETS SHALL BE
USED WHEREVER APPLICABLE. SPECIFIC DETAILS ON THE STRUCTURAL DRAWINGS TAKE
PRECEDENCE OVER "TYPICAL DETAILS". SPECIFIC NOTES ON STRUCTURAL DRAWINGS
TAKE PRECEDENCE OVER NOTES SHOWN IN "GENERAL NOTES".
10.
THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE, UNLESS OTHERWISE SHOWN THEY DO NOT INDICATE METHOD OF
CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO
PROTECT THE CONSTRUCTION AND ALL ADJACENT PROPERTIES DURING CONSTRUCTION.
SUCH MEASURES SHALL INCLUDE BUT ARE NOT LIMITED TO BRACING, SHORING OF
LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY
THE ARCHITECT OR E.O.R SHALL NOT INCLUDE OBSERVATION OF THE ABOVE ITEMS.
11.
DESIGN CRITERIA
GENERAL NOTES
TYPICAL ABBREVIATIONS
GLB. GLUE-LAMINATED BEAM
GR.BM.GRADE BEAM
GWB. GYPSUM WALLBOARD
HI. HIGH
HDR. HEADER
HFX HARDY FRAME
HORIZ.HORIZONTAL
INFO. INFORMATION
K.P. KING POST
LT.WT.LIGHT WEIGHT
L.V.L. LAMINATED VENEER LUMBER
MAS. MASONRY
M.B. MACHINE BOLT
MANUF.MANUFACTURER
(N) NEW
N.G. NATURAL GRADE
O/C ON CENTER
P.J. POUR JOINT
PSL. PARALLAM BEAM
PLWD.PLYWOOD
P.T. PRESSURE TREATED
REINF.REINFORCING
REQ'D REQUIRED
RR. ROOF RAFTER
T.O.B TOP OF BEAM
UNO.UNLESS NOTED OTHERWISE
V.I.F. VERIFY IN FIELD
F.H. FULL HEIGHT
A. NAILS ARE SMOOTH-COMMON, BOX OR DEFORMED SHANKS EXCEPT WHERE OTHERWISE
STATED. NAILS FOR FRAMING AND SHEATHING CONNECTIONS SHALL HAVE MINIMUM
AVERAGE BENDING YIELD STRENGTHS AS SHOWN: 90 ksi FOR SHANK DIAMETERS LARGER
THAN 0.142 INCH BUT NOT LARGER THAN 0.177 INCH, AND 100 ksi FOR SHANK DIAMETERS
OF 0.142 INCH OR LESS.
B. NAILS SHALL BE SPACED AT NOT MORE THAN 6 INCHES ON CENTER AT ALL SUPPORTS
WHERE SPANS ARE 48 INCHES OR GREATER.
C. FOUR-FOOT BY 8-FOOT OR 4-FOOT BY 9 FOOT PANELS SHALL BE APPLIED VERTICALLY.
D. SPACING OF FASTENERS NOT INCLUDED IN THIS TABLE SHALL BE BASED ON CHAPTER 23.
E. FOR WOOD STRUCTURAL PANEL ROOF SHEATHING ATTACHED TO GABLE END ROOF
FRAMING AND TO INTERMEDIATE SUPPORTS WITHIN 48 INCHES OF ROOF EDGES AND
RIDGES, NAILS SHALL BE SPACED AT 6 INCHES ON CENTER WHERE THE ULTIMATE DESIGN
WIND SPEED IS LESS THAN 130 MPH AND SHALL BE SPACED 4 INCHES ON CENTER WHERE
THE ULTIMATE DESIGN WIND SPEED IS 130 MPH OR GREATER BUT LESS THAN 140 MPH.
F. GYPSUM SHEATHING SHALL CONFORM TO ASTM C1396 AND SHALL BE INSTALLED IN
ACCORDANCE WITH GA 253. FIBERBOARD SHEATHING SHALL CONFORM TO ASTM C208.
G. SPACING OF FASTENERS ON FLOOR SHEATHING PANEL EDGES APPLIES TO PANEL EDGES
SUPPORTED BY FRAMING MEMBERS AND REQUIRED BLOCKING AND AT FLOOR PERIMETERS
ONLY. SPACING OF FASTENERS ON ROOF SHEATHING PANEL EDGES APPLIES TO PANEL EDGES
SUPPORTED BY FRAMING MEMBERS AND REQUIRED BLOCKING. BLOCKING OF ROOF OR
FLOOR SHEATHING PANEL EDGES PERPENDICULAR TO THE FRAMING MEMBERS NEED NOT BE
PROVIDED EXCEPT AS REQUIRED BY OTHER PROVISIONS OF THIS CODE. FLOOR PERIMETER
SHALL BE SUPPORTED BY FRAMING MEMBERS OR SOLID BLOCKING.
H.WHERE A RAFTER IS FASTENED TO AN ADJACENT PARALLEL CEILING JOIST IN ACCORDANCE
WITH THIS SCHEDULE, PROVIDE TWO TOE NAILS ON ONE SIDE OF THE RAFTER AND TOE NAILS
FROM THE CEILING JOIST TO TOP PLATE IN ACCORDANCE WITH THIS SCHEDULE. THE TOE NAIL
ON THE OPPOSITE SIDE OF THE RAFTER SHALL NOT BE REQUIRED.
I. RSRS-01 IS A ROOF SHEATHING RING SHANK NAIL MEETING THE SPECIFICATIONS IN
ASTM F1667.
FOR NON-SHEAR WALL APPLICATIONS, ANCHOR BOLT SHALL BE INSTALL WITH ROUND
WASHERS AND SHOULD CONFORM WITH ANSI/ASME B 18.22.1. USE MIN. 1 3/8" Ø X
7/64" THICK WASHER FOR 1/2" Ø BOLT, 1 3/4" Ø X 9/64" THICK WASHER FOR 5/8" Ø
BOLT AND 2 1/2" Ø X 11/64" THICK WASHER FOR 1" Ø BOLT. U.N.O.
NAIL SPACING TO BE NOT LESS THAN REQUIRED PENETRATION. EDGE AND END
DISTANCES SHALL BE NOT LESS THAN HALF THIS SPACING. ALL SPACING AND EDGE AND
END DISTANCES SHALL BE SUCH AS TO AVOID SPLITTING OF THE WOOD. HOLES FOR
NAILS, WHERE NECESSARY TO PREVENT SPLITTING, SHALL BE BORED OF A DIAMETER
SMALLER THAN THAT OF THE NAILS. ALL NAILS SHALL BE SINKER NAILS AND STAGGERED
U.N.O., EXCEPT AS SHOWN IN NAILING SCHEDULE.
STRUCTURAL GLUED-LAMINATED (GLULAM) TIMBER OF SOFTWOOD SPECIES SHALL BE IN
CONFORMANCE WITH ANSI/AITC STANDARD A190.1 AND ASTM D3737, OR OTHER CODE
APPROVED DESIGN, MANUFACTURING AND/OR QUALITY ASSURANCE PROCEDURES.
MEMBERS SHALL BE MARKED WITH THE ENGINEERED WOOD SYSTEM APA EWS
TRADEMARK INDICATING CONFORMANCE WITH THE MANUFACTURING, QUALITY
ASSURANCE AND MARKING PROVISIONS OF ANSI/AITC STANDARD A190.1. THE
MANUFACTURER OR SELLER SHALL SUBMIT CERTIFICATES OF CONFORMANCE TO THE
FIELD INSPECTOR PRIOR TO INSTALLATION.
ALL NON-STRUCTURAL ELEMENTS SHALL BE CONSTRUCTED PER APPROVED CODE
REQUIREMENTS. FRAMING PLAN IS ONLY SHOWING FOR THE MAIN STRUCTURAL
ELEMENTS IN ACCORDANCE WITH BUILDING CODE OR REQUIREMENTS ARE SPECIFIED OR
REQUIRED BY THE LOCAL JURISDICTION.
ALL CEILING JOISTS ARE TO BE 2x JOISTS. REFER TO FRAMING FOR ACTUAL SIZE AND
SPACING.
USE 5/8" DIA. X MIN. 12" ANCHOR BOLTS W/ MIN. 7" EMBEDMENT INTO CONCRETE
FOOTING AT 48" O.C. MAX. FOR SILL PLATE TO FOUNDATION UNLESS NOTED OTHERWISE
ON SHEARWALL SCHEDULE. A BOLT BETWEEN 6" TO 12" FROM THE END OF EACH PIECE
OF SILL (2 BOLTS MIN EACH PIECE). PIECE OF SILL SHALL BE CONSIDERED ENDED WHERE
PLATE IS CUT OUT OVER ONE-THIRD OF CROSS SECTION.
FOR INTERIOR NON-SHEAR WALLS USE SIMPSON 0.157"Ø SERIES PDPAWL SHOT PINS
WITH A PENETRATION OF 11/4" INTO SLAB AT 16" O.C. TO BE INSTALLED IN ACCORDANCE
WITH ICC ESR-2138.
THE FOLLOWING BEAMS/HEADERS/RIMS CAN BE FROM ANY MANUFACTURER WITH
CURRENT APPROVED ICC-ES EVALUATION REPORT WITH THE FOLLOWING MECHANICAL
PROPERTIES:
ALL WALLS SHALL BE CONSTRUCTED USING 2x STUDS @ 16" O.C. REFER TO FRAMING
PLANS FOR ACTUAL STUD SIZE AND SPACING.
TYPICAL UNBLOCKED DIAPHRAGM, UNO ON PLANS4.
5.
HOT DIP GALVANIZED FASTENERS SUCH AS (BUT NOT LIMITED TO) NAILS, SCREWS,
BOLTS, THREADED ROD, ETC., SHALL BE USED WHEN IN CONTACT WITH PRESERVATIVE
OR FIRE RETARDANT TREATED LUMBER. EXCEPTION: PLAIN CARBON STEEL FASTENERS IN
SBX/DOT AND ZINC BORATE PRESERVATIVE TREATED WOOD IN AN INTERIOR, DRY
ENVIRONMENT SHALL BE PERMITTED.
STUD WALLS PERPENDICULAR TO A CONCRETE OR MASONRY WALL SHALL BE BOLTED TO
THE CONCRETE OR MASONRY WALL WITH 5/8" DIAMETER X 8" A307 BOLTS AT TOP,
MID-HEIGHT AND BOTTOM.
FRAMING MEMBER
BEAMS/ POST/ RAFTERS
& ALL OTHER
STRUCTURAL FRAMING
2x FRAMING: #2 DF
4x FRAMING: #2 DF
6x FRAMING: #1 DF
8x FRAMING: #1 DF
STUDS DFL STUD GRADE (UP TO 9'-0")
DFL #2 (TALLER THAN 9'-0")
TOP PLATES & MUD SILLS DFL CONSTRUCTION GRADE OR BETTER
ALL STRUCTURAL WOOD SHALL BE OF DOUGLAS FIR-LARCH SPECIES, (19% MAXIMUM
MOISTURE CONTENT AT THE TIME OF CONSTRUCTION U.N.O.).
FRAMING
MEMBER
BEAM/
HEADERS
SIZE (WIDTH)Fb Fc perp F Fv Ft Ec parallel TYPE
MATERIAL
RIM
BOARD
3 1/2" & WIDER
1 3/4" & 2 5/8" WIDE
1 1/4" THICK (MIN)
3100
PSI
2800
PSI
1750
PSI
750
PSI
525
PSI
285
PSI
285
PSI
225
PSI
2150
PSI
2150
PSI
1100
PSI
2.0E6
PSI
3000
PSI
2500
PSI
(MIN)
SPEC CAMBER CONDITION
LVL
LVL
LVL
24F-V4
24F-V8
2400 PSI 1850 PSI
Fb
@ BOT @ TOP
Fb Fv
(MIN)
E
(MIN)
265 PSI
2.0E6
PSI
1.3E6
PSI
1.8E6 PSI1600' RADIUS,
UNO SINGLE SPAN
2400 PSI 2400 PSI 265 PSI 1.8E6 PSI1600' RADIUS,
UNO ALL OTHERS
NAIL SIZE
8d COMMON
10d COMMON
16d COMMON
0.131"2 1/2"
0.148"
0.162"
3"
3 1/2"
SPECIFICATION
SAWN LUMBER1.
STRUCTURAL COMPOSITE LUMBER2.
GLUED LAMINATED LUMBER3.
750
PSI
3000
PSI
SHANK DIAMETER LENGTH
ROOF
FLOOR
SHEATHING
APA RATED SHEATHING 15/32
PERFORMANCE CATEGORY 32/16
EXPOSURE 1
NAILING
8d's @ 6" B.N.
8d's @ 6" E.N.
8d's @ 12" F.N.
APA RATED STURD-I-FLOOR 23/32
PERFORMANCE CATEGORY 24" OC
EXPOSURE 1
10d's @ 6" B.N.
10d's @ 6" E.N.
10d's @ 12" F.N.
USE RING OR SCREW SHANK NAILS AND GLUE SHEATHING TO FRAMING USING
ADHESIVES MEETING APA SPECIFICATION AFG-01 OR ASTM D3498.
AS AN ALTERNATE TO 10D COMMON NAILS, THE FOLLOWING FASTENERS CAN BE USED:
GRABBER PLYWOOD SCREWS (ICC-ER-5280), OR SIMPSON STRONG-TIE QUICK DRIVE
SCREWS (ICC-ER-1472)
FOR SHEAR WALL APPLICATIONS, ANCHOR BOLT SHALL BE INSTALLED WITH PLATE
WASHERS OF MIN. 3" SQ. X 0.229" THICK BETWEEN SILL PLATE AND NUT. EDGE(S) OF
PLATE WASHERS SHALL BE 1/2" MAX. FROM INSIDE FACE OF SHEAR PANEL.
ALL METAL FRAMING CONNECTORS SHALL BE MANUFACTURED BY SIMPSON STRONG TIE
COMPANY (CURRENT CATALOG), OR "USP" WITH EQUIVALENT ICC PUBLISHED VALUES AND
SHALL BE INSTALLED PER SPECIFICATIONS, NO EXCEPTIONS.
1.
2.
3.
4.
SILL PLATE SHALL BE PRESSURE-TREATED AND UNDER SHEAR WALLS OF UP TO 4'-0" IN
LENGTH MUST BE CONTINUOUS.
6.
7.
8.
10.
STUD BEARING WALLS AND PARTITIONS SHALL HAVE HAVE DOUBLE TOP PLATES LAPPED
AT WALL AND PARTITION INTERSECTIONS. JOINTS IN UPPER AND LOWER MEMBERS OF
DOUBLE TOP PLATES SHALL BE STAGGERED AT LEAST 4'-0".
HOLES IN WOOD MEMBERS FOR BOLTS SHALL BE THE NOMINAL BOLT DIAMETER PLUS 1/16".
LAG SCREWS SHALL BE TURNED, NOT DRIVEN, INTO PRE DRILLED HOLES. HOLES IN
WOOD FOR LAG SCREW SHANK SHALL BE BORED TO THE SAME DIAMETER AND DEPTH AS
THE SHANK, AND FOR THE THREADED PORTION BORED WITH A BIT NOT LARGER THAN
40% TO 70% OF THE SHANK DIAMETER.
I-JOISTS SHALL BE MANUFACTURED BY WEYERHAEUSER OR EQUIVALENT APPROVED ICC
MANUFACTURED PRODUCT.
9.
WOOD COLUMNS SHALL HAVE SOLID VERTICAL BLOCKING THROUGH THE FLOORS TO THE
SUPPORT BELOW.
FOR WALLS 10'-0" AND GREATER PROVIDE BLOCKING AT MID-HEIGHT FOR CONSTRUCTION
STABILITY.
ALL WALLS SHALL HAVE SINGLE BOTTOM PLATE AND DOUBLE TOP PLATE, UNO.
ALL EXTERIOR LUMBER AND ALL LUMBER IN CONTACT WITH CONCRETE OR MASONRY, OR
EXPOSED TO THE EXTERIOR SHALL BE TREATED LUMBER.
DO NOT CUT, BORE, COUNTERSINK OR NOTCH WOOD MEMBERS EXCEPT WHERE SHOWN IN
THE DETAILS.
PROVIDE DOUBLE JOISTS BENEATH ALL PARALLEL WALLS AND SOLID BLOCKING BENEATH
ALL WALLS PERPENDICULAR TO JOISTS.
WOOD NAILERS: UNO. ON PLANS AND DETAILS, WHERE WOOD MEMBERS ARE TO BE
CONNECTED TO STEEL ELEMENTS, OR WHERE WOOD NAILERS CONNECTED TO STEEL
MEMBERS ARE NEEDED FOR PROPER INSTALLATION OF FINISH MATERIALS, AS A MINIMUM
PROVIDE WOOD NAILERS AS SPECIFIED BELOW WITH 5/8"Ø WELDED THREADED STUDS @
24" O.C.:
A. WOOD NAILERS NEEDED ONLY FOR INSTALLATION OF FINISH MATERIAL: 2X
WOOD NAILERS, COUNTERSINKING OF THREADED STUDS BOLT IS ACCEPTABLE IF NEEDED
FOR FLUSH INSTALLATION OF FINISH MATERIAL.
B. WOOD NAILERS NEEDED TO SUPPORT OTHER WOOD ELEMENTS: 2X OR 3X WOOD
NAILERS WITH OR WITHOUT COUNTERSINKING OF THREADED STUDS BOLT RESPECTIVELY.
1.
2.
3.
4.
5.
6.
7.
8.
9.
12.
10.
13.
14.
WOOD SCREWS SHALL BE TURNED, NOT DRIVEN, INTO LEAD HOLES. SOAP OR OTHER
LUBRICANTS SHALL BE PERMITTED AS NEEDED TO FACILITATE THE INSERTION AND
PREVENT DAMAGE OF THE WOOD SCREW. LEAD SCREWS SHALL BE ABOUT 7/8 THE
DIAMETER OF THE SCREW. THE MINIMUM PENETRATION OF WOOD SCREWS SHALL BE 10
TIMES THE SCREW DIAMETER OR 1.5", WHICHEVER IS GREATER. PENETRATION IS
MEASURED INTO THE PIECE RECEIVING THE NAIL POINT.
15.
11.
16.
17.
NAILING & HARDWARE
WOOD FRAMING
WOOD
(MIN)(MIN)(MIN)(MIN)(MIN)
ALL WOOD CONSTRUCTION CONNECTORS SHOWN ON THE PLANS OR DETAILS SHALL BE
SIMPSON STRONG-TIE OR EQUIVALENT, U.N.O. ALL CONNECTORS SHALL BE INSTALLED
PER MANUFACTURER'S RECOMMENDATIONS IN CONJUNCTION WITH APPROVED ICC
REPORTS. NOTIFY E.O.R FOR ANY POTENTIAL SUBSTITUTION PRIOR TO COMMENCING
WORK.
18.
- ALL SHEATHING SHALL BE LAID WITH FACE GRAIN PERPENDICULAR TO SUPPORTS, SHALL
BE C-D OR C-C SHEATHING CONFORMING TO CBC 2303.1.5.
1. BLOCKING BETWEEN CEILING
JOISTS OR RAFTERS TO TOP PLATE
2. CEILING JOISTS TO TOP PLATE
3. CEILING JOIST NOT ATTACHED TO
PARALLEL RAFTER, LAPS OVER
PARTITION
4. CEILING JOIST ATTACHED TO
PARALLEL RAFTER
5. COLLAR TIE TO RAFTER, FACE NAIL
OR 1 1/4"X20 GA.RIDGE
STRAP TO RAFTER
6. RAFTER OR ROOF TRUSS
TO TOP PLATE
7. ROOF RAFTERS TO RIDGE, VALLEY
OR HIP RAFTERS OR ROOF RAFTER
TO MINIMUM 2" RIDGE BEAM
3-8d COMMON
3-16d COMMON
PER TABLE 2308.11.3.1
DESCRIPTION OF BUILDING ELEMENTS NUMBER AND TYPE
OF FASTENER
TOE NAIL
FACE NAIL
FACE NAIL
EACH RAFTER
(2) TOE NAILS ON
ONE SIDE AND (1)
TOE NAIL ON OPP.
SIDE OF EACH
RAFTER OR TRUSS
3-8d COMMON PER JOIST,
TOE NAIL
3-10d COMMON
FACE NAIL
3-10d COMMON
3-10d COMMON TOE NAIL
SPACING AND
LOCATION
ROOF
WALL
8. STUD TO STUD(NOT AT BRACED
WALL PANELS)
16d COMMON 24" o.c. FACE NAIL
9. STUD TO STUD AND ABUTTING
STUDS AT INTERSECTING WALL
CORNERS ( AT BRACED WALL PANELS)
16" o.c. FACE NAIL16d COMMON
10. BUILT-UP HEADER( 2" TO 2"
HEADER WITH 1/2" SPACER)
16d COMMON 16" o.c. FACE NAIL
11. CONTINUOUS HEADER TO STUD 4-8d COMMON TOE NAIL
12. TOP PLATE TO TOP PLATE 16d COMMON 16" o.c. FACE NAIL
13. DOUBLE TOP PLATE SPLICE 8-16d COMMON FACE NAIL ON EA.
SIDE OF END JOINT
(MINIMUM 24" LAP
SPLICE LENGTH EA.
SIDE OF END JOINT)
14. BOTTOM PLATE TO JOIST, RIM
JOIST,BAND JOIST OR BLOCKING(NOT
AT BRACED WALL PANELS)
16d COMMON
15. BOTTOM PLATE TO JOIST, RIM
JOIST,BAND JOIST OR BLOCKING(AT
BRACED WALL PANELS)
2-16d COMMON
20. 1"x8" AND WIDER SHEATHING TO
EACH BEARING.
FACE NAIL
19. 1"x 6" SHEATHING TO EACH
BEARING.
2-8d COMMON FACE NAIL
18. 1" BRACE TO EACH STUD
AND PLATE.
2-8d COMMON FACE NAIL
17. TOP PLATES, LAPS AT CORNERS
AND INTERSECTIONS.
2-16d COMMON FACE NAIL
16. TOP OR BOTTOM PLATE TO
STUD.
2-16d COMMON
NAILING SCHEDULE
END NAIL
3-8d COMMON
16" o.c. FACE NAIL
16" o.c. FACE NAIL
21. JOIST TO SILL, TOP PLATE OR
GIRDER.
3-8d COMMON TOE NAIL
22. RIM JOIST, BAND JOIST OR
BLOCKING TO SILL OR TOP PLATE
8d COMMON 6" o.c. TOE NAIL
23. 1"x6" SUBFLOOR OR LESS TO
EACH JOIST.
2-8d COMMON FACE NAIL
24. 2" SUBFLOOR TO JOIST OR
GIRDER.2-16d COMMON BLIND AND
FACE NAIL
25. 2" PLANKS (PLANK &
BEAM-FLOOR & ROOF).
AT EACH BEARING,
FACE NAIL.
26. BUILT-UP GIRDERS AND BEAMS,
2-INCH LUMBER LAYERS.
20d COMMON
32" O.C. FACE
NAIL AT TOP AND
BOTTOM
STAGGERED ON
OPPOSITE SIDES.
AND:
2-20d COMMON
FACE NAIL AT
ENDS AND AT
EACH SPLICE.
27. LEDGER STRIP SUPPORTING
JOISTS OR RAFTERS.3-16d COMMON
EACH JOIST OR
RAFTER,
FACE NAIL
29. BRIDGING OR BLOCKING
TO JOIST.
2-8d COMMON EACH END, TOE
NAIL
2-16d COMMON
28. BAND OR RIM JOIST TO JOIST.3-16d COMMON END NAIL
PROJECT DESIGN CRITERIA
BUILDING CODE 2025 CBC
OCCUPANCY CATEGORY III
GEOTECHNICAL ENGINIEER ASSUMED - CH. 18 MINIMUMS
REPORT NUMBER N/A
DATE N/A
ALLOWABLE SOIL BEARING PRESSURE 1500 PSF
GEOTECHNICAL PARAMETERS
VERTICAL (GRAVITY) DESIGN PARAMETERS: (PSF)
(LIVE LOADS ARE REDUCIBLE, U.N.O.)
Dead Roof live Snow Live
20 20 -Roof
COEFFICIENT OF FRICTION -
CONCRETE SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH THE LATEST EDITION OF
ACI 318 AND ACI 301 EXCEPT AS MODIFIED BY THE CONSTRUCTION DOCUMENTS.
PORLAND CEMENT SHALL CONFORM TO ASTM C-150, TYPE II, U.N.O.
THE CONCRETE COMPRESSIVE STRENGTH (28 DAYS), f'c=3000
a. ALL LOCATIONS, U.N.O: MIN 3000 PSI, (W/C = 0.45) SPECIAL INSPECTION IS
REQUIRED WHEN f'c > 2500 PSI.
b. CONCRETE IN CONTACT WITH SOIL CONTAINING SULFATE So4 ≥ 0.1% BY
WEIGHT: 4000 PSI, SPECIAL INSPECTION IS NOT REQUIRED.
c. CONCRETE IN CONTACT WITH SOIL CONTAINING SULFATE So4 ≥ 0.2% BY
WEIGHT: 4500 PSI, SPECIAL INSPECTION IS NOT REQUIRED.
1.
AGGREGATE FOR STONE CONCRETE SHALL CONFORM TO ASTM C-33. FOR LOW
SHRINKAGE AGGREGATE, USE LIMESTONE OR GRANITE. AGGREGATE FOR LIGHTWEIGHT
CONCRETE SHALL CONFORM TO ASTM C-330.
DO NOT USE ANY CONCRETE OR GROUT CONTAINING CHLORIDES. WATER USED IN
MIXING CONCRETE SHALL CONFORM WITH ASTM C1602.
CONCRETE MIX DESIGNS CONTAINING FLY ASH MAY BE USED WHERE CONCRETE IS NOT
VISUALLY EXPOSED. FLY ASH SHALL CONFORM WITH ASTM C618 AND MAY REPLACE UP
TO 20% PORTLAND CEMENT BY VOLUME.
CONCRETE STRENGTH TEST REPORTS SHALL BE IN COMPLIANCE WITH ACI 318 AND
SHALL BE SUBMITTED TO E.O.R. FOR REVIEW.
ALL REINFORCING BARS, ANCHOR BOLTS AND ALL OTHER CONCRETE INSERTS SHALL BE
WELL SECURED IN POSITION PRIOR TO PLACING CONCRETE.
2.
3.
4.
5.
6.
7.
8.
9.
CONCRETE
TIME BETWEEN CONCRETE BATCHING AND PLACEMENT SHALL BE IN ACCORDANCE WITH
ASTM C94.
10.CONCRETE PLACEMENT/CURING/REDUCTION IN STRENGTH SHALL CONFORM TO ACI 305R
AND 3065R REQUIREMENTS FOR HOT AND COLD WEATHER CONCRETING.
11.CONCRETE SHALL BE CURED PER ACI 308R, UNLESS ALTERNATE METHODS OF CURING
HAVE BEEN APPROVED BY THE ARCHITECT OR ENGINEER. FOR SLAB CURING,
CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING COMPATIBILITY OF CURING
COMPOUNDS WITH PROPOSED FINISHES PRIOR TO COMMENCING ANY WORK.
MAX. SLUMP SHALL BE 5 INCHES EXCEPT WHERE ADMIXTURES/PLACITIZERS HAVE BEEN
ADDED IN THE MIX DESIGN TO IMPROVE FLOWABILITY/WORKABILITY. THE SLUMP LIMIT
SHALL BE BASED ON ADMIXTURE MANUFACTURER'S RECOMMENDATIONS.
12.
FASTENING SCHEDULE :(AS PER AISI LATEST EDITION )
CONNECTION NUMBER AND SIZE
OF FASTENERS
SPACING OF FASTENERS
FLOOR JOIST TO TRACK OF AN
INTERIOR LOAD BEARING WALL.
FLOOR JOIST TO TRACK AT END OF
JOIST
SUBFLOOR SHEATHING TO FLOOR
JOIST
2-#10 SCREWS EACH JOIST
2-#10 SCREWS ONE PER FLANGE OR TWO
PER BEARING STIFFENER
#10 SCREWS2
1
6" ON CENTER ON EDGES
AND 10" ON CENTER AT
INTERMEDIATE SUPPORTS
STUD TO TOP OR BOTTOM TRACK 2-#10 SCREWS
EACH END OF STUD,
ONE PER FLANGE
STRUCTURAL SHEATHING( ORIENTED
STRAND BOARD OR PLYWOOD)
TO FRAMING
6" ON EDGES & 12" ON
INTERMEDIATE SUPPORTS#10 SCREWS2
1/2" GYPSUM WALL BOARD TO
FRAMING #10 SCREWS 12" O.C.
CEILING JOIST TO TOP TRACK OF LOAD
BEARING WALL.2-#10 SCREWS EACH JOIST
ROOF SHEATHING( ORIENTED STRAND
BOARD OR PLYWOOD) TO RAFTERS #10 SCREWS
6" ON CENTER ON EDGES
AND 12" ON CENTER AT
INTERIOR SUPPORTS
RAFTER/TRUSS TO BEARING WALL 2-#10 SCREWS EACH RAFTER/TRUSSES
3
GABLE END TRUSS/RAFTERS TO
ENDWALL TOP TRACK #10 SCREWS 12" O.C.
RAFTER TO CEILING JOIST OR
RIDGE MEMBER MIN. #10 SCREWS SEE NOTE NO.4
NOTES:
1. SCREW SIZES SHOWN ARE MINIMUM. UNLESS OTHERWISE NOTED.
2. HEAD STYLE SHALL BE BUGLE-HEAD, FLAT HEAD OR SIMILAR HEAD WITH MINIMUM
HEAD DIAMETER OF 0.29"
3. SCREWS SHALL BE APPLIED THROUGH THE FLANGE OF THE RAFTER/TRUSS OR CEILING
JOIST OR A 16 GAUGE CLIP ANGLE SHALL BE USED WITH 2 #10 SCREWS IN EACH LEG.
4. NUMBER OF SCREWS REQUIRED AT EACH LEG OF CLIP ANGLE FOR RAFTER TO RIDGE
MEMBER CONNECTION
(See Table footnotes in Next column)
FOUNDATION TRACK
3.
4.
5.
14.
13.
6.
7.
8.
9.
10.
FLOOR SLAB SHALL BE POURED LEVEL TO 1/8" IN 10'.
12.
15.
11.
ADMIXTURES IN CONCRETE MIX. CONTAINING CALCIUM CHLORIDES SHALL NOT BE USED.
16.
18.
17.
19.
a. DO NOT WALK ON SLAB UNTIL 24 HOURS AFTER CONCRETE HAS BEEN POURED.
b. BEGIN WALL FRAMING 4-5 DAYS AFTER CONCRETE POURED.
c. BEGIN ROOF/FLOOR FRAMING 7-10 DAYS AFTER CONCRETE POURED.
d. DO NOT LOAD ROOF PRIOR TO 14 DAYS AFTER CONCRETE POURED.
FOR INTERIOR NON-SHEAR WALLS USE SIMPSON PDPA SERIES 0.157"Ø PINS WITH A
PENETRATION OF 1 1/4" INTO SLAB AT 24" O.C. TO BE INSTALLED IN ACCORDANCE WITH
ICC ESR-2138. ACTUAL SLAB THICKNESS TO BE MINIMUM 4". ALL INTERIOR SHEAR
WALLS TO HAVE A.BS. PER FOUNDATION PLAN.
ALL HOLDOWNS AND POST ANCHORS TO BE INSTALLED ACCORDING TO MOST CURRENT
SIMPSON STRONG TIE SPECIFICATIONS AND REQUIREMENTS OF ICC-ER REPORTS &
SHALL BE TIED IN PLACE PRIOR TO FOUNDATION INSPECTION. DIMENSIONS ARE NOT
FURNISHED TO SIMPSON HOLDOWNS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR'S
SUPERINTENDENT, THE FRAMING CONTRACTOR AND THE CONCRETE CONTRACTOR TO
LOCATE THESE ANCHORS IN THE EXACT LOCATION. REFER TO DETAILS FOR PROPER
INSTALLATION.
MIN. CONCRETE WIDTH TO BE 8" FOR RECEIVING PA, HPA & STHD'S. VERIFY LOCATIONS
OF HOLDOWNS AND ANCHOR BOLTS WITH ROUGH FRAMING TO ASSURE ACCURATE
INSTALLATION.
PROVIDE #3 X 24" DOWEL AT 24" O.C. AND 12" FROM THE CORNER AT ALL CONCRETE
STOOPS AND PORCHES.
PROVIDE MIN. (1) #4 REINFORCING FOR ELECTRICAL GROUND, LOCATION TO BE VERIFIED
WITH THE ELECTRICAL CONTRACTOR.
VERIFY MIN. FOUNDATION DEPTH, WIDTH, REINFORCING STEEL AND ADDITIONAL
EXPANSIVE SOIL REQUIREMENTS WITH VALID SOILS REPORT AND IF MORE STRINGENT,
THEY SHALL SUPERSEDE THE ABOVE MINIMUM REQUIREMENTS. SEE NOTE #8 UNDER
REINFORCED CONCRETE FOR CONCRETE STRENGTH.
PLACEMENT SHALL BE IN ONE CONTINUOUS OPERATION UNLESS OTHERWISE SPECIFIED.
SLAB SURFACE SHALL BE CURED WITH 'HUNTS' COMPOUND OR EQUAL OR CURED WITH
OTHER METHODS IN ACCORDANCE WITH GOOD CONSTRUCTION PRACTICE AT
CONTRACTOR'S OPTION.
CONTRACTOR SHALL DAMPEN SLAB UNDERLAYMENT OF SAND/MEMBRANE JUST PRIOR TO
CONCRETE PLACEMENT TO ASSIST UNIFORM CONCRETE CURING. SLABS MUST NOT BE
POURED DURING OR IMMEDIATELY AFTER RAINSTORMS. THE SPECIFIED SAND OVER
VISQUEEN SHOULD NOT BE SATURATED AT THE TIME OF THE CONCRETE POUR. ANY FREE
WATER TRAPPED IN THE SAND LAYER MUST BE REMOVED PRIOR TO THE CONCRETE
POUR.THE BOTTOMS OF FOOTING EXCAVATIONS SHALL BE LEVEL, CLEAN AND FREE OF LOOSE
MATERIAL OR WATER WHEN CONCRETE IS PLACED. OVER EXCAVATION SHALL BE FILLED
WITH CONCRETE OR PROPERLY COMPACTED FILL THAT HAS BEEN TESTED AND APPROVED
BY THE SOILS ENGINEER. BACKFILL SHALL NOT BE PLACED UNTIL SUPPORTING
FOUNDATIONS, WALLS AND SLAB HAVE ATTAINED SUFFICIENT STRENGTH TO SUPPORT
LATERAL SOIL PRESSURE.
CONCRETE PLACEMENT SHALL BE MONOLITHIC IN ONE CONTINUOUS OPERATION
UNIFORMLY PLACED AND MUST BE VIBRATED AND WELL CONSOLIDATED UNLESS SHOWN
OTHERWISE ON PLANS. DUAL POUR IS DEFINED BY ACI AS TO WHEN 1ST. & 2ND. POUR
CAN NOT BE VIBRATED TOGETHER.
FINISH GRADE AROUND THE PERIMETER OF SLAB SHALL BE CONSTRUCTED SUCH THAT
RAIN AND IRRIGATION WATER IS DRAINED AWAY FROM THE SLAB.
FOUNDATION DRAWINGS PREPARED BY E.O.R. REFLECT THE STRUCTURAL REQUIREMENTS.
REFER TO ARCHITECTURAL PLANS FOR DIMENSIONS, DEPRESSIONS, SLOPE, SHELVES,
PATIOS, STOOPS AND PORCHES NOT SHOWN IN FOUNDATION DRAWINGS. ACCURACY OF
THE DIMENSIONS AND FINAL FIT OF THE BUILDING SHALL BE REVIEWED BY THE
ARCHITECT AND THE CONTRACTOR PRIOR TO CONSTRUCTION.
WAITING PERIOD FOR CONCRETE SLABS-ON-GRADE PRIOR TO START OF CONSTRUCTION
IS AS FOLLOWS:
NO PIPES OR CONDUITS SHALL EXTEND UNDER ISOLATED COLUMN FOOTING OR UNDER
CONTINUOUS WALL FOOTINGS UNLESS SPECIFICALLY DETAILED OR APPROVED BY THE
ARCHITECT, STRUCTURAL ENGINEER AND THE BUILDING OFFICIAL.
3a.
ALL CONTINUOUS FOOTINGS TO HAVE 5/8"DIA. X MIN. 12" ANCHOR BOLTS, MIN. 7"
EMBEDMENT INTO CONCRETE FOOTING AT 72" O.C. UNLESS NOTED OTHERWISE ON
PLANS. ONE ANCHOR BOLT SHOULD BE LOCATED MAX. 12" AWAY AND MIN. 9 3/8" FROM
THE END OF THE BOTTOM TRACK. MIN. (2) A.BS. PER BOTTOM TRACK/SHEAR PANEL.
BOTTOM TRACK UNDER SHEAR WALLS OF UP TO 8'-0" IN LENGTH MUST BE CONTINUOUS.
SEE NOTE 2 FOR BOTTOM TRACK FASTENERS AT INTERIOR NON-SHEAR WALLS.
ANCHOR BOLTS AT SHEAR WALLS SHALL BE INSTALLED WITH PLATE WASHERS OF
SIMPSON BP5/8-3 OR BPS5/8-3 BETWEEN TRACK AND NUT. ANCHOR BLOTS SHALL
HAVE A MINIMUM 1 3/4" EDGE DISTANCE FROM CONCRETE STEM WALL/FOUNDATION
FACE AS SHOWN BELOW.
TYPICAL BP INSTALLED WITH A BOTTOM TRACK ANCHOR BOLT
7"
M
I
N
I
M
U
M
E
M
B
E
D
M
E
N
T
SIMPSON BP/BPS
1 3/4" Min
FOOTINGS SHALL BEAR ON NATIVE SOIL
THE CBC CHAPTER 18 SHALL BE FOLLOWED AND SHALL BE CONSIDERED MINIMUM
REQUIREMENTS UNLESS MORE STRINGENT REQUIREMENTS ARE PRESENTED IN THE
SPECIFICATIONS OR ON THE DRAWINGS.
1.
2.
TYPICAL UNBLOCKED DIAPHRAGM, UNO ON PLANS18.
ROOF
FLOOR
SHEATHING
APA RATED SHEATHING 15/32
PERFORMANCE CATEGORY 32/16
EXPOSURE 1
NAILING
#10 SCREW @ 6" B.N.
#10 SCREW @ 6" E.N.
#10 SCREW @ 12" F.N.
APA RATED STURD-I-FLOOR 19/32
PERFORMANCE CATEGORY 20" OC
EXPOSURE 1
#10 SCREW @ 6" B.N.
#10 SCREW @ 6" E.N.
#10 SCREW @ 12" F.N.
- ALL SHEATHING SHALL BE LAID WITH FACE GRAIN PERPENDICULAR TO SUPPORTS, SHALL
BE C-D OR C-C SHEATHING CONFORMING TO CBC 2303.1.5.
- ALL FASTENERS SHALL BE #10 X2" LONG FLAT-HEAD SELF DRILLING SELF TAPPING
SCREWS WITH MIN. HEAD DIAMETER OF 0.333 IN.
COLD FORMED METAL FRAMING
10.PROVIDE MINIMUM YIELD STRESS, FY , OF 50 KSI FOR 16 GAUGE (54 MIL) AND THICKER
AND 33 KSI FOR 18 GAUGE (43 MIL) AND THINNER.
11.COLD-FORMED STEEL JOISTS SHALL HAVE PUNCHED ENLARGED SERVICE HOLES WITH
STIFFENED FLANGES.
12.EXTERIOR WALL STUDS SHALL BE 600S162-43 (18 GAUGE) @24" O.C. AND SATISFYING
THE REQUIREMENTS OF LOAD BEARING STUD WALLS PER TABLE OF NOTE 13 BELOW
(WHICHEVER IS GREATER).UNLESS NOTED OTHERWISE ON PLANS. WALLS SHALL BE
PROVIDED WITH MANUFACTURER'S STANDARD BRIDGING ( EITHER WELDED 2 1/2"X18
GAUGE STUD OR CLIPPED COLD-ROLLED CHANNEL 1 1/2"X16" GAUGE). PROVIDE
BRIDGING AT 4'-0" O.C. MAXIMUM FOR LOAD BEARING WALLS AND EXTERIOR WALLS.
13.
EXCEPTION: WHERE FULL HEIGHT SHEATHING OR GYP BOARD OCCURS ON BOTH SIDE OF
WALL STUDS, BRIDGING IS ALLOWED TO BE OMITTED
14.ALL KNEE WALL STUDS OVER THE FOOTING STEMS SHALL BE 600S162-54
(16 GAUGE) @ 24" O.C. UON.
ACCEPTABLE COLD-FORMED METAL FRAMING MANUFACTURERS
MANUFACTURER
CEMCO
DIETRICH METAL FRAMING
SCAFCO CORP.
UNITED METAL PRODUCT, INC.
ICC-ES NUMBER
ESR-4943P
ESR-4943P
ESR-4943P
ESR-4943P
LARR NUMBER
RR24923
RR25132
SHOP DRAWINGS: WHERE IS PROPOSED TO DIFFER FROM DETAILS SHOWN, SUBMIT
SHOP DRAWINGS. SHOW METHOD OF STUD ATTACHMENT TO FLOOR AND CEILING
TRACKS, ATTACHMENT OF TRACKS, CONSTRUCTION OVER AND AROUND DOORS AND
OTHER OPENINGS, AT CORNERS, CEILING DETAILS, AND OTHER SIGNIFICANT FEATURES.
FRAMING AT DOOR JAMBS AND OPENINGS: PROVIDE SINGLE 18 GAUGE STUD OR
DOUBLE 20 GAUGE STUDS AT DOOR JAMBS AND CASED OPENINGS, AND OTHER
LOCATIONS INDICATED.
CROSS-BRACING: UNLESS INDICATED ON DRAWINGS, CROSS-BRACING AT DOUBLE
STUD WALLS AND PARTITION SHALL NOT BE USED TO LIMIT DEFLECTION UNLESS
ACOUSTICAL PERFORMANCE OF WALL OR PARTITION IS NOT DEGRADED.
TRACKS, SILLS AND HEADERS: UNPUNCHED CHANNELS SIZED FOR STUD FLANGES,
GAUGE THE SAME AS STUDS UNLESS OTHERWISE NOTED. SLOTTED HEAD TRACKS AT
STUDS TO STRUCTURE ABOVE.
METAL FRAMING FINISH: ALUMINUM-ZINC CORROSION RESISTANT COATING, ASTM A792
OR HOT DIPPED GALVANIZED ASTM A525 G60.
SCREWS: AS RECOMMENDED OR REQUIRED BY MANUFACTURER, SELF-FILLING,
SELF-TAPPING IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
MANUFACTURER'S PROPRIETARY TYPE " SSCJ" C-SHAPED STEEL JOISTS OF THE SIZE
INDICATED ON WITH
EXTRA-LARGE TRAPEZOID-SHAPED SERVICE HOLES WITH FY=33 KSI FOR 18 GAUGE AND
50 KSI FOR 16,
14 AND 12 GAUGE.
PROVIDE JOIST BRIDGING/BLOCKING @ 8'-0" O.C. MAXIMUM.
STUDS AND JOISTS INSTALLATION: INSTALL STUDS AND JOISTS AT 24 INCHES ON
CENTER TYPICALLY, UNLESS OTHERWISE INDICATED. DO NOT SPLICE STUDS AND
JOISTS. PROVIDE STUDS NOT MORE THAN 2 INCHES FROM EACH CORNER OF WALL OR
ABUTTING CONSTRUCTION.
SECURE STUDS TO TOP AND BOTTOM TRACKS WITH 2-#10 SCREWS PER LOCATION.
BACKING PLATES: 16 GAUGE GALVANIZED SHEET METAL COVERING FULL WIDTH OF
STUD SPACING BY 4 INCH WIDE MINIMUM. INSTALL STUD TRACK OR SHEET METAL
BACKING AS INDICATED AND AS NECESSARY TO SUPPORT ALL PRODUCTS ATTACHED TO
WALL OR CEILING AFTER COMPLETION OF FINISH SURFACE, INCLUDING TOILET AND BATH
ACCESSORIES, PLUMBING AND ELECTRICAL FIXTURE, ELECTRICAL PANELS, TOILET
PARTITIONS, CASEWORK, HARDWARE, HANDRAILS AND TRIM.
TRACK INSTALLATION: PLACE AND ALIGN TRACKS IN CONFIGURATIONS SHOWN. SECURE
TOP, BOTTOM AND SIDE TRACKS AT MAXIMUM 24 INCHES ON CENTER TO STRUCTURE
USING FASTENERS AS DETAILED. PROVIDE FOR DEFLECTION AT TOP TRACK OF
PARTITION FRAMING ABUTTING STEEL FLOOR OR ROOF DECK, AS INDICATED ON THE
DRAWINGS.
COORDINATION: COORDINATE ERECTION OF STUDS AND JOISTS WITH INSTALLATION OF
SERVICE UTILITIES TO MINIMIZE DISCONTINUITY IN FARMING. ALIGN STUD WEB
OPENINGS. COORDINATE WITH INSTALLATION OF BUCKS, ANCHORS, BACKING,
BLOCKING, PLUMBING, MECHANICAL AND ELECTRICAL COMPONENTS TO PROVIDE
NECESSARY CLEARANCES AND SUPPORTS. COORDINATE WITH REQUIREMENTS FOR
DOOR AND WINDOW FRAME SUPPORTS AND ATTACHMENTS.
CLEARANCES: MAINTAIN CLEARANCE UNDER BUILDING STRUCTURAL MEMBERS TO
AVOID DEFLECTION TRANSFER TO NON-LOAD BEARING FRAMING.
OPENINGS AND RECESSES: PROVIDE FRAMED OPENINGS FOR ALL RECESSED AND
BUILT-IN COMPONENTS. COORDINATE INSTALLATION OF FRAMING WITH REQUIREMENTS
FOR DOOR AND WINDOW FRAME SUPPORTS AND ATTACHMENTS.
BRACING INSTALLATION: INSTALL BRACING AT STUDS AND JOISTS TO MAKE RIGID.
INSTALL INTERLOCKING BRIDGING MEMBER THROUGH STUD WEB OPENINGS AT STUDS
7-1/2 FEET IN LENGTH OR GREATER.
COLD FORMED METAL FRAMING GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
15.
16.
14.
1.ALL COLD-FORMED METAL FRAMING SHALL CONFIRM TO AISI STANDARD S100-16
"NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL
STRUCTURAL MEMBERS''.
2.SHALL MEET ALL THE REQUIREMENT AISI 2022 LATEST EDITION.
3.CONTRACTOR SHALL PROVIDE EFFECTIVE, FULL TIME QUALITY CONTROL OVER ALL
FABRICATION AND ERECTION COMPLYING WITH THE PERTINENT CODES AND
REGULATIONS OF GOVERMENT AGENCIES HAVING JURISDICTION.
4.PROVIDE ALL ACCESSORIES INCLUDING, BUT NOT LIMITED TO, TRACKS, CLIPS WEB
STIFFENERS, ANCHORS, FASTENING DEVICES, RESILIENT CLIPS, AND OTHER
ACCESSORIES REQUIRED FOR A COMPLETE AND PROPER INSTALLATION, AND AS
RECOMMENDED BY THE MANUFACTURER FOR THE STEEL MEMBERS USED.
5.FASTENING OF COMPONENTS SHALL BE WITH ICC APPROVED SELF-DRILLING SCREWS
OR WELDING, SCREWS OR WELDS SHALL BE OF SUFFICIENT SIZE TO INSURE THE
STRENGTH OF THE CONNECTION ALL WELDS OF GALVANIZED STEEL SHALL BE TOUCHED
UP WITH A ZIN-RICH PAINT. ALL WELDS OF CARBON SHEET STEEL SHALL BE TOUCHED UP
WITH PAINT. WIRE TYING OF COMPONENTS SHALL NOT BE PERMITTED.
6.UNIFORM AND LEVEL JOIST BEARING SHALL BE PROVIDES AT FOUNDATION WALLS BY
MEANS OF SHIMS AND/OR NON-SETTING GROUT.
7.ALL MATERIAL AND WORKMANSHIP SHALL CONFORM TO AISI "SPECIFICATION FOR THE
DESIGN OF COLD FORMED STEEL'', LATEST EDITION.
8.ALL WELDING SHALL BE DONE BY CERTIFIED WELDERS IN FULL COMPLIANCE WITH AWS
D1.3
9.UNLESS NOTED OTHERWISE ON THE DRAWINGS, SCREWS SHALL BE #10-16 SELF
DRILLING, SELF TAPPING HEX HEAD SCREWS WITH HEAD DIAMETER OF 0.333 IN.
ALL WALL STUD FRAMING SHALL SATISFY THE REQUIREMENTS OF TABLE BELOW.
PROVIDE BRIDGING AT 4'-0" O.C. MAXIMUM FOR LOAD BEARING WALLS. WHERE FULL
HEIGHT SHEATHING OR GYP BOARD OCCURS ON BOTH SIDE OF WALL STUDS, BRIDGING
IS ALLOWED TO BE OMITTED.
STUD SIZE
MAXIMUM SPACING WHEN SUPPORTING
ONE FLOOR
ROOF &
CL'G
TWO FLOOR
ROOF &
CL'G
STUD
HEIGHT
BEARING WALLS
(inches)
600S162-54
24
600S162-43
362S162-43 24
24 --
(feet)
9
NON-BEARING WALLS
STUD
HEIGHT
(inches)
24
(feet)
16'-0"
9
9 24 24 24
MAXIMUM SPACING
(inches)(inches)
ROOF &
CL'G ONLY
24
--
2424'-0"
2426'-0"
362S162-54 24 249 2416'-0"24
17.IN-LINE FRAMING: EACH JOIST, RAFTER, TRUSS, AND STRUCTURAL WALL STUD (ABOVE
OR BENEATH) SHALL BE ALIGNED VERTICALLY ACCORDING TO LIMIT OF AISI-S200 .
THE ALIGNMENT TOLERANCE IS NOT REQUIRED WHERE LOAD DISTRIBUTION MEMEBER IS
SPECIFIED IN PLAN DRAWINGS OR DETAILS.
SHEET INDEX
SHEET NO.SHEET TITLE
S-0.10 GENERAL NOTES & REQUIREMENTS
S-1.0 FOUNDATION AND FRAMING PLAN
S-0.20 TYPICAL COLD FORM DETAILS
SD1.0 STRUCTURAL DETAILS
S-0.11 GENERAL NOTES & REQUIREMENTS
A
SHEET NO.:
PROJECT MANAGER:
S.W.
DATE:
JOB NO.: 25263
04/07/2026
Pr
o
j
e
c
t
A
d
d
r
e
s
s
:
TE
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
(
P
H
A
S
E
3
)
29
0
9
D
A
I
M
L
E
R
S
T
R
E
E
T
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
5
Pr
o
j
e
c
t
N
a
m
e
:
543A2
R
E
V
I
S
I
O
N
DA
T
E
DE
S
C
R
I
P
T
I
O
N
6
Core Structure, Inc.
From The Ground Up
STAMPED 04/01/2026
201 E Sandpointe Ave.
Suite #400
Santa Ana, CA 92707
Phone: 949-954-7244
info@corestructure.com
04
/
0
1
/
2
0
2
6
PL
A
N
C
H
E
C
K
C
O
R
R
E
C
T
I
O
N
S
GE
N
E
R
A
L
N
O
T
E
S
&
RE
Q
U
I
R
E
M
E
N
T
S
S-0.10
PREFABRICATED OR SPECIALTY ITEMS AND THEIR COMPONENTS, WHICH ARE INDICATED
BY THE STRUCTURAL DRAWINGS TO BE DESIGNED BY OTHERS, MAY BE SUBMITTED TO
THE ARCHITECT AND/OR E.O.R. FOR REVIEW AS A DEFERRED SUBMITTAL PROVIDED THAT
SUCH SUBMITTAL IS AUTHORIZED BY THE BUILDING DEPARTMENT. DEFERRED
SUBMITTALS REQUIRED TO BE SUBMITTED TO THE E.O.R. SHALL INCLUDE BUT NOT BE
LIMITED TO:
STRUCTURAL STEEL TO BE SUPPLIED DETAILED, FABRICATED AND ERECTED IN
ACCORDANCE WITH AISC SPECIFICATIONS.
NON-SHRINK GROUT BENEATH COLUMN BASES OR BEARING PLATES SHALL BE 5000
PSI(MIN.) NON-SHRINK SHALL BE INSTALLED IMMEDIATELY AFTER COLUMN IS PLUMBED.
CONTRACTOR SHALL NOT LOAD COLUMN ANCHOR BOLTS UNDER PLACEMENT OF
NON-SHRINK GROUT WITHOUT TAKING APPROPRIATE MEASURES TO PREVENT BUCKLING
OF ANCHOR BOLTS UNDER CONSTRUCTION LOADS.
CONTINUOUS AND PERIODIC SPECIAL INSPECTION IS REQUIRED FOR THE WORK AS
DESCRIBED IN IBC/CBC CHAPTER 17, SEE INSPECTION SCHEDULE BELOW, ONLY CHECKED
ITEMS ARE REQUIRED.
APPROVAL BY THE INSPECTOR DOES NOT MEAN APPROVAL OF FAILURE TO COMPLY WITH THE
PLANS OR SPECIFICATIONS, ANY DETAIL THAT FAILS TO BE CLEAR OR IS AMBIGUOUS MUST BE
REFERRED TO THE STRUCTURAL ENGINEER FOR INTERPRETATION OR CLARIFICATION.
SPECIAL INSPECTION PER AISC 360 / AISC 341 IS REQUIRED FOR ALL STRUCTURAL STEEL
WELDING, BOLTING.
STRUCTURAL WOOD, PERIODIC SPECIAL INSPECTION IS REQUIRED FOR WOOD SHEARWALLS,
SHEAR PANELS, AND DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING, AND OTHER
FASTENING OF COMPONENTS OF THE SEISMIC FORCE RESISTING SYSTEM, INCLUDING WOOD
SHEARWALLS, WOOD DIAPHRAGMS, DRAG STRUTS, BRACES, SHEAR PANELS, AND HOLD-DOWNS,
EXCEPTION: SPECIAL INSPECTION IS NOT REQUIRED FOR WOOD SHEARWALLS, SHEAR PANELS
AND DIAPHRAGMS, INCLUDING NAILING, BOLTING, ANCHORING AND OTHER FASTENING TO OTHER
COMPONENTS OF THE SEISMIC FORCE RESISTING SYSTEM, WHERE THE FASTENER SPACING OF
THE SHEATHING IS MORE THAN 4 INCHES ON CENTER. INSPECTIONS SHALL BE PERFORMED
BEFORE COVERING.
1.1.
1.
SHOP DRAWINGS SHALL BE SUBMITTED FOR ALL STRUCTURAL ITEMS. SHOP DRAWINGS
ARE REVIEWED ONLY FOR GENERAL COMPLIANCE WITH THE STRUCTURAL DRAWINGS.
DESIGN ACCURACY OF SUCH PRODUCT, DIMENSIONS AND QUANTITY OF THE PRODUCT
IS NOT REVIEWED BY E.O.R. RESPONSIBILITY FOR CORRECTNESS SHALL REST WITH THE
CONTRACTOR. ANY CHANGES, SUBSTITUTIONS, OR DEVIATIONS FROM CONTRACT
DRAWINGS SHALL BE CLOUDED. ANY OF THE AFOREMENTIONED SHALL NOT BE
CONSIDERED APPROVED AFTER ENGINEER'S REVIEW UNLESS SPECIFICALLY NOTED
ACCORDINGLY.
3.
PROVIDE THE FOLLOWING MATERIALS FOR STRUCTURAL STEEL, UNO:2.
ROLLED WIDE FLANGE SECTIONS
HOLLOW STRUCTURAL SECTIONS (HSS),
SQUARE AND RECT.
ASTM A992 (Fy = 50 ksi)
ASTM A500, GR.B (Fy = 46 KSI)
STEEL PIPE ASTM A53, GR B (Fy=35 KSI)
HOLLOW STRUCTURAL SECTION (HSS),
ROUND
ASTM A500, GR. B (Fy=42 KSI)
HP SECTIONS ASTM A572, GR.50 (Fy=50 KSI)
PLATES, ANGLES, CHANNELS & TEES ASTM A36
MACHINE BOLTS ASTM A307
HIGH STRENGTH BOLTS ASTM A325, Type N, A490
WELDED HEADED STUDS ASTM A108 / A1044
HOLES FOR BOLTS SHOULD BE DRILLED OR PUNCHED & SHALL BE 1/16" LARGER THAN
BOLT DIAMETER.
ALL STRUCTURAL WELDING PROCEDURES AND MATERIALS SHALL CONFORM TO BUILDING
CODE, CHAPTER 22. ALL WELDING SHALL BE DONE BY CERTIFIED WELDERS.
ALL TESTING AND INSPECTION OF SHOP AND FIELD WELDING OPERATIONS SHALL BE
MADE BY A CERTIFIED WELDING INSPECTOR WHICH ARE APPROVED BY THE BUILDING
OFFICIAL.
3.
4.
5.
WELDING SHALL CONFORM THE LATEST EDITION OF AWS D1.1 AND SHALL USE EITHER
THE SHIELDED OR FLUX CORE METHODS. ELECTRODES USED SHALL BE E70XX, E71-T8
OR E70-T6. ALL WELDING SHALL BE PERFORMED BY QUALIFIED AND CERTIFIED WELDERS.
6.
ALL FABRICATIONS SHALL BE DONE IN A SHOP OF AN APPROVED AND LICENSED
FABRICATOR BY AISC AND/OR LOCAL JURISDICTION. STRUCTURAL STEEL SHOP
DRAWINGS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW AND
APPROVAL PRIOR TO FABRICATION.
7.
THE SHOP DRAWINGS DO NOT SUPERSEDE OR REPLACE THE ORIGINAL CONTRACT
DRAWINGS. ANY ENGINEERING PROVIDED BY OTHERS AND SUBMITTED FOR REVIEW
SHALL BEAR THE SEAL OF AN APPROPRIATELY REGISTERED ENGINEER. ENGINEERING
SYSTEM SOLUTIONS SHALL NOT BE RESPONSIBLE FOR THE ADEQUACY OF ENGINEERING
DESIGNS PERFORMED BY OTHERS.
4.
SHOP DRAWINGS SHALL REFERENCE DATE AND DELTA (IF ANY) OF CONTRACT DRAWINGS.5.
ALL DEFERRED SUBMITTALS SHALL INCLUDE CALCULATIONS AND DRAWINGS PREPARED IN
ACCORDANCE WITH ALL APPLICABLE BUILDING CODES AND STAMPED BY AN
APPROPRIATELY LICENSED PROFESSIONAL ENGINEER. SUBMITTALS SHALL SHOW
LOCATION AND MAGNITUDE OF LOADS, SIZE AND CONFIGURATIONS OF MEMBERS, AND
COMPATIBILITY WITH THE PRIMARY STRUCTURAL SYSTEM.
2.
CONTRACTOR RESPONSIBLE FOR CONSTRUCTION OF A WIND OR SEISMIC FORCE RESISTING
SYSTEM/COMPONENT LISTED IN THIS STATEMENT OF SPECIAL INSPECTION SHALL SUBMIT A
WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE OWNER PRIOR
TO THE COMMENCEMENT OF WORK ON SUCH A SYSTEM OR COMPONENT PER SEC
1704.4.
WHERE FABRICATION OF MEMBERS AND ASSEMBLIES IS PERFORMED ON THE PREMISES OF A
FABRICATOR'S SHOP, SPECIAL INSPECTION OF THE FABRICATED ITEMS SHALL BE REQUIRED BY
THIS SECTION, UNLESS THE FABRICATOR IS REGISTERED AND APPROVED TO PERFORM SUCH
WORK WITHOUT SPECIAL INSPECTION, APPROVAL SHALL BE BASED UPON REVIEW OF THE
FABRICATOR'S WRITTEN PROCEDURAL AND QUALITY CONTROL MANUALS AND PERIODIC AUDITING
OF FABRICATION PRACTICES BY AN APPROVED SPECIAL INSPECTION AGENCY, AT COMPLETION
OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE
TO THE BUILDING OFFICIAL STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH
THE APPROVED CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL BE RESPONSIBLE OF
VERIFYING APPROVAL OF FABRICATOR.
2.
3.
4.
5.
6.
STRUCTURAL STEEL
8.
WELDS IDENTIFIED AS REQUIRING CONTINUOUS OR PERIODIC INSPECTIONS NEED NOT TO
HAVE CONTINUOUS SPECIAL INSPECTION WHEN THE WELDING IS PERFORMED IN AN
APPROVED FABRICATOR'S SHOP. FABRICATOR SHALL SUBMIT A CERTIFICATE OF
COMPLIANCE IN ACCORDANCE WITH CBC SECTION 1704.2.
9.
ALL FULL PENETRATION GROOVE WELDS FOR MOMENT CONNECTIONS SHALL BE
ULTRASONICALLY INSPECTED BY AN APPROVED TESTING AGENCY AND SHALL CONFORM
TO THE LATEST EDITION OF AWS D1.1, SECTIONS 5 & 6.
10.
STEEL FABRICATOR SHALL VERIFY ALL DIMENSIONS WITH ARCHITECTURAL AND
STRUCTURAL DRAWINGS AND COORDINATE WITH MECHANICAL DRAWINGS AND
SUB-CONTRACTOR FOR SIZE, LOCATION OF ALL MECHANICAL UNITS AND OPENINGS.
11.
ALL MISC. FILLET WELDS NOT NOTED, INCLUDING THOSE FOR STIFFENERS, MISC. PLATES,
ETC. SHALL BE PER AISC 360, TABLE J2.4.
12.
WELDED MEMBERS AND CONNECTIONS IN THE SEISMIC LOAD RESISTING SYSTEM SHALL
BE SUBJECT TO AWS D1.8 REQUIREMENTS.
13.
NUTS ASTM A563
ANCHOR RODS/BOLTS ASTM F1554, GR. 36 OR 55
SUBMITTALS AND SHOP DRAWINGS
STATEMENT OF SPECIAL INSPECTION:
THE SPECIAL INSPECTOR SHALL BE A QUALIFIED INDIVIDUAL WHO WILL DEMONSTRATE
COMPETENCE, AND KNOWLEDGE TO THE BUILDING OFFICIAL, FOR THE SPECIFIC TYPE OF SPECIAL
INSPECTION REQUIREMENT REQUIRED PER SCHEDULE BELOW.
7.
WOOD SPECIAL INSPECTIONS SHALL BE PER CBC SECTION 1705.5.8.
SPECIAL INSPECTIONS FOR WIND AND SEISMIC RESISTANCE SHALL BE PER SECTION 1705.12
AND 1705.13 RESPECTIVELY.
9.
REQ'D(?)
STATEMENT OF SPECIAL INSPECTIONS
(ONLY INDICATED ITEMS ARE REQUIRED)
INSPECTION ITEMS SPECIAL INSPECTORS
(NAME, PHONE#, REGISTRATION#)
STRUCTURAL STEEL (1705.2.1)
STEEL FRAME JOINT DETAILS
COLD-FORMED STEEL DECK (1705.2.3)
OPEN-WEB STEEL JOISTS AND
JOISTS GIRDERS (1705.2.4)
REINFORCING STEEL AND
PRE-STRESSING STEEL TENDONS
SHOTCRETE (CURING TEMPERATURE,
DESIGN MIX, PLACEMENT, STRENGTH
ETC. PER TABLE 1705.3)
COLD-FORMED STEEL TRUSSES SPANNING
>= 60 FT (1705.2.5)
CONCRETE CONSTRUCTION (DESIGN MIX,
FORMWORK, PLACEMENT, ETC. PER TABLE
1705.3) (SEE 1705.3 EXCEPTIONS)
STRUCTURAL WELDING/REBAR WELDING
ALL MASONRY CONSTRUCTION (1705.4)
WOOD FOR HIGH LOAD DIAPHRAGMS
(1705.5.1)
METAL-PLATE-CONNECTED WOOD
TRUSSES SPANNING >=60 FT (1705.5.2)
SOILS (EXCAVATION, FILL, ETC. PER
1705.6) (SEE 1705.6 EXCEPTIONS)
DRIVEN PILES PER 1705.7
CAST IN PLACE PILES PER 1705.8
HELICAL PILE FOUNDATIONS PER 1705.9
ERECTION OF PRE- CAST CONCRETE MEMBERS
BOLTS INSTALLED IN CONCRETE
HIGH STRENGTH BOLTING/MATERIAL
VERIFICATION
WOOD DIAPHRAGM AND SHEAR WALLS*
*: FOR STRUCTURAL OBSERVATION OF WOOD DIAPHRAGMS AND SHEAR WALLS, CONTACT E.O.R.
FOR SCHEDULE.
EPOXY/ POST INSTALLED ANCHORSYES
SHEET NO.:
PROJECT MANAGER:
S.W.
DATE:
JOB NO.: 25263
04/01/2026
Pr
o
j
e
c
t
A
d
d
r
e
s
s
:
TE
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
(
P
H
A
S
E
3
)
29
0
9
D
A
I
M
L
E
R
S
T
R
E
E
T
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
5
Pr
o
j
e
c
t
N
a
m
e
:
54312
R
E
V
I
S
I
O
N
DA
T
E
DE
S
C
R
I
P
T
I
O
N
6
Core Structure, Inc.
From The Ground Up
STAMPED 04/01/2026
201 E Sandpointe Ave.
Suite #400
Santa Ana, CA 92707
Phone: 949-954-7244
info@corestructure.com
04
/
0
1
/
2
0
2
6
BU
I
L
D
I
N
G
D
E
P
A
R
T
M
E
N
T
C
O
R
R
E
C
T
I
O
N
S
GE
N
E
R
A
L
N
O
T
E
S
&
RE
Q
U
I
R
E
M
E
N
T
S
S-0.11
S-0.20
4
2
3
5
6
TY
P
I
C
A
L
C
O
L
D
FO
R
M
D
E
T
A
I
L
S
110
9
12
8
STUD BRACING W/ STRAPPING & SHTH'G MATERIAL
WALL
FRAMING
1-1/2"x43 MIL
FLAT STRAP
WALL
SHEATHING
NO.10 SCREW
@ EACH STRAP TO STUD
2 NO.10 SCREWS
@ STRAP TO BLOCKING
BEND SECTION OR CLIP
FLANGE TO FORM VERTICALSTUD/TRACK BLOCKING
@ EACH END OF STRAP
& INTERMITTENTLY EVERY 12'
SPAZZER ™ 9200 LAP DETAIL
SPAZZER™ 9200
BRIDGING/SPACER BAR
INSTALL PER MANUFACTURER'S
INSTRUCTIONS.
TYPICAL
STUD
2" LAP AT
PUNCHOUT
(2)DRYWALL SCREWS
(2)DRYWALL
SCREWS
SPAZZER™ 9200
SECTION
SINGLE TRACK HDR & SILL
SECTION OF CEMCO STUD.
SCREW ATTACH TO JAMB
W/4-#10 SCREWS (NOT SHOWN)
SCREW ATTACH AT
EACH FLANGE(#10 SCREW)
JAMB STUD
BOTTOM TRACK
CRIPPLE STUD
FASTEN TO MAIN
STRUCTURE MIN #10 SCREWS
@ 12" O.C. UNO ON PLANS OR
SHEAR WALL SCHEDULE.
SILL TRACK
HEADER TRACK
CRIPPLE STUD
SCREW ATTACH AT EACH FLANGE ( #10 SCREW)
SECTION OF STUD.
SCREW ATTACH TO JAMB W/4-#10 SCREWS
6"
M
I
N
CAP OPENING SIDE OF JAMB W/TRACK
(MIN 18 GAUGE). EXTENDED 6'' ABOVE HEADER
& 6'' BELOW SILL & CONNECT W/#10 @12" O.C.
(EA. FLANGE)
BACK-TO-BACK JAMB STUDS (PER PLAN)
SCREW ATTACH WITH #10 @12" O.C.
STAGGERED
CONDITION A- SINGLE JAMB
CONDITION B- BACK TO BACK JAMB
LARGE OPENING-BOXED HDR CONNECTION DETAIL
SCREW ATTACH AT
EACH FLANGE W N1#10 (N1 PER
TABLE SCHEDULE)
SINGLE/DOUBLE BACK TO BACK
STUDS PER PLAN
CAP OPENING SIDE OF JAMB W/ TRACK
EXTENDED 6'' ABOVE HEADER
& 6'' BELOW (MIN 16 GAUGE)
PIECE OF TRACK
( 16 GAUGE, W/ 1.5" FLANGE WIDTH, MIN)
HEADER UNPUNCHED
STUDS (PER PLAN)
TRACKS TOP & BOTTOM
CRIPPLE STUD
SCREW ATTACH TOP AND
BOTTOM TRACKS
W#10@12" O.C. TYP.
#10 SCREWS @ 12" O.C. AT DOUBLE
BACK TO BACK CONDITION ONLY (STAGGERED)
SCREW ATTACHMENT TO HDR WEB
(EA.SIDE) W/ N2 #10 (N2 PER TABLE)
SCREW ATTACHMENT TO JAMB/CAP
W/ N3 #10 (N3 PER TABLE)
HDR
SECTION
HDR GAUGE
(MIL)N1 N2 N3 ALLOWABLE
CAPACITY(#)
18 (43)600S 3
16 (54) & HIGHER
3 6 1500#
3000# (NOTE 1)
18 (43)800S 4
16 (54) & HIGHER
4 8 2000#
4000# (NOTE 1)
18 (43)1000S 5
16 (54) & HIGHER
5 10 2500#
5000# (NOTE 1)
18 (43)1200S
& DEEPER 6
16 (54) & HIGHER
6 12 3000#
6000# (NOTE 1)
NOTES:
1- CONNECTION CAPACITY BASED
ON MIN 16 GA (54 MIL) JAMB STUD
2- CAPACITIES INDICATED ARE ONLY
FOR CONNECTION CAPACITY. SEE PLANS
FOR REQUIRED HDR SECTION.
3- FOR NON-LOAD BEARING HDRS UP TO
8FT SPAN, USE 2-600S137-43.
4- FOR NON-LOAD BEARING HDRS UP TO
12FT SPAN, USE 2-800S137-43.
5- FOR LOAD BEARING HDRS SEE PLANS.
6- FOR ENGINEER: CAPACITIES INDICATED
DO NOT CONSIDER BEAM SHEAR &
BENDING, CHECK AND DESIGN FOR THEM.
WALL FRAMING
INTERSECTION FRAMING
CORNER FRAMING
SCREWS
AS REQUIRED
SCREWS
AS REQUIRED
STUD OR CLIP ANGLES
AS REQUIRED FOR
STUD CONNECTION
WALL TRANSITION
SCREWS
AS REQUIRED
NOTES:
- CONNECT MULTI-STUD AND
CORNER TOGETHER W/#10 SDS
@12" O.C. U.N.O
CONNECTION DETAIL
PIECE OF CEMCO STUD OR
TRACK BLOCKING MIN 18GA
(43 MIL) THICK TO MATCH
DEPTH FLOOR JOIST,
(INSTALL AT ENDS OF FLOOR
SYSTEM, ADJACENT TO OPENINGS
AND @ MAX 8'-0'' O.C.)
1 1/2'' WIDE x 18GA (43 MIL)
THICK TOP & BOTTOM FLAT
STRAP (STRAP TO START AND
END ON SOLID BLOCKING)
ATTACH CLIP TO JOIST
& BLOCKING
ATTACH STRAP TO
BLOCKING W/ 4-#10 MIN.
CFS FLOOR JOISTSSIMSPSON CLIP OR EQUIVALENT,
PER TABLE T1, w/3-#10
SCREWS EACH LEG(MIN)
NOTE:
TOP STRAP NOT REQUIRED
IF TOP SIDE IS FULLY/
CONTINUOUSLY SHEATHED
9"11-1/4" - 14"
7"
5"
TABLE T.1
JOIST DEPTH
9-1/4" - 10"
7-1/4" - 8"
CLIP LENGTH (X)
18 GAUGE MIN
1.
2. FOR ALTERNATE DETAIL
USING " SB" SURE BRIDGE
SEE DETAIL15
ATTACH EA. FLANGE
W/ 1-#10 MIN.
CORNER FRAMING DETAIL
NO.8 SCREWS
TRACK
EXTERIOR WALL
STUD
EXTERIOR GYPSUM
WALL BOARD FINISH
TRACK
2 NO.10 SCREWS
@ 24" O.C. CONNECTING
CORNER STUDS.
4 - NO.10 SCREWS AT
LAPPED TRACK
CLIP TRACK FLANGE
AT LAP JOINT
PLAN
ALT. PLAN
7
RIM TRACK SPLICE
PIECE OF CFS JOIST
SAME SIZE AND GAUGE AS
TRACK (16'' LONG)
SCREW ATTACH EACH
END (8)#10 EA. LEG (16 TOTAL)
RIM TRACK
TRACK SPLICE
SILL TRACK
SCREW ATTACH BOTH ENDS OF SILL
TRACK TO SHORT SECTION OF STUD
W/ 4#10 SCREWS ON BOTH SIDES
STUD SAME SIZE AS WALL
STUDS, SAME GA, AS TRACK
11 NON-LOAD BR'G WALL-SLIP TRACK DETAIL
1/2" DEFLECTION
GAP
CFS STUD PER PLAN
#8 x 9/16"
WAFERHEAD FRAMING
SCREWS (TYP.)
TOP TRACK WHERE
OCCURS ( SLIP
TRACK)
BUILT UP FRAMING
WELD BOX BEAMBUILT UP BEAM
FOUR PIECES
THREE PIECES
TWO PIECES
1/8"1@12
TOP &
BOTTOM
C-STUD/JOIST
PER PLAN
C-STUD/JOIST
PER PLAN
#10 SDS
@12" O.C.
STAGGERED
MIN 16GA
TRACK OR
SAME GAUGE
WITH BM AT
TOP AND
BOT..
TYP. #10
SDS @12"
O.C. TRACK
TO BM
BOTH SIDE
AS SHOWN
#10 SDS
@12" O.C.
TRACK WEB
TO BM FLANGE
@TOP & BOT.
AS SHOWN
C-STUD/JOIST
PER PLAN
1/8"1@12
TOP &
BOTTOM
1/8"1@12
TOP &
BOTTOM
TYP. #10 SDS
@12" O.C.
ATTACH STUD
TOGETHER
(STAGGERED)
3"X4"X18GA THICK
PLATE W/(2)#10
SDS TO EA STUD,
@24" O.C.
AS REQUIRED
TYP. #10 SDS
@12" O.C.
ATTACH STUD
TOGETHER
BACK-TO-BACK
STUD / POST
BOX
STUD / POST
C-STUD / POST
WHERE OCCURS
1/8"1@12 ALT.
NOTES:
- INSTALL WEB STIFFENER AT EACH END AND MID SUPPORT OF
BEAM & PROVIDE ONE STIFFENER AT EACH JOIST.
- ATTACH STUDS TOGETHER W/#10 @12" O.C. (U.N.O.) OR ALT.
USE 1/8" WELD 1" LONG @12" O.C.
"SB" SURE BRIDGE BRACING DETAIL
SURE-BRIDGE BRIDGING
CEMCO SSCJ FLOOR JOISTS
SCREW ATTACH
EACH FLANGE, TYP
BRIDGING FOR 1-3/4" FLANGE JOISTS
THICKNESS
(MIL)
PART
NUMBER
43
(NO. 18)
175SB4312
175SB4316
175SB43192
175SB4324
LENGTH
10"
14"
17-1/4"
22"
JOIST
SPACING
12" O.C.
16" O.C.
19.2" O.C.
24" O.C.
BRIDGING FOR 2" FLANGE JOISTS
200SB4312
200SB4316
200SB43192
200SB4324
9-3/4"
13-3/4"
17"
21-3/4"
12" O.C.
16" O.C.
19.2" O.C.
24" O.C.
NOTE:
TOP SIDE OF JOIST SHALL BE
FULLY/ CONTINUOUSLY SHEATHED.
43
(NO. 18)
THICKNESS
(MIL)
PART
NUMBER LENGTH JOIST
SPACING
IN LINE FRAMING
BEARING WEB
STIFFENER
TOP TRACK
C-STUD BELOW
C.L. STUD
HORIZONTAL
FRM'G
MEMBER
BEARING WEB
STIFFENER
TOP TRACK
C-STUD BELOW
HORIZONTAL
MEMBER
C.L. BEARING
STIFFENER
3/4" MAX
HORIZONTAL
FRM'G MEMBER
VERTICAL
FRM'G
MEMBER
3/4" MAX
VERTICAL
FRM'G
MEMBER
1/8" MAX FROM
WEB OF HORZ.
MEMBER TO
EDGE OF VERT.
MEMBER
HORIZONTAL
FRM'G MEMBER
VERTICAL
FRM'G MEMBER
3/4" MAX
C.L. HORZ.
MEMBER
C.L. STUDC.L. STUDC.L. STUD
SHEET NO.:
PROJECT MANAGER:
S.W.
DATE:
JOB NO.: 25263
04/01/2026
Pr
o
j
e
c
t
A
d
d
r
e
s
s
:
TE
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
(
P
H
A
S
E
3
)
29
0
9
D
A
I
M
L
E
R
S
T
R
E
E
T
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
5
Pr
o
j
e
c
t
N
a
m
e
:
54312
R
E
V
I
S
I
O
N
DA
T
E
DE
S
C
R
I
P
T
I
O
N
6
Core Structure, Inc.
From The Ground Up
STAMPED 04/01/2026
201 E Sandpointe Ave.
Suite #400
Santa Ana, CA 92707
Phone: 949-954-7244
info@corestructure.com
04
/
0
1
/
2
0
2
6
BU
I
L
D
I
N
G
D
E
P
A
R
T
M
E
N
T
C
O
R
R
E
C
T
I
O
N
S
13
5
6
ROOF FRAMING @ MECH'L. UNITS
NOTES:
1. PROVIDE BOUNDARY NAILING TYP. @ PERIMETER/ OPNG.
2. ROOF OPENING DIMENSIONS SHALL BE FIELD VERIFIED.
3. TOTAL WEIGHT MECHANICAL UNIT AND CURB OR PLATFORM, TYP.
8'-0"
4'-0"4'-0"
CL MECH.
UNIT
BEAM PER PLAN
4
SD1.0 TYP.
VERIFY W/ MANUF.
4
SD1.0TYP.
2
SD1.0TYP.
(E) COL.
(E) BEAM PER PLAN
2A
SD1.0TYP.
3
SD1.0
BE
A
M
P
E
R
P
L
A
N
(E) 2x/ 3x SUBPURLINS
W/ SIMP. "U" HANGER
WHERE DIMENSION
EXCEEDS 2'-0", TYP.
RE
I
N
F
O
R
C
E
D
(E
)
4
x
P
U
R
L
I
N
SIMP. "HU" HANGER, TYP.
MA
J
O
R
DI
M
E
N
S
I
O
N
BE
A
M
P
E
R
P
L
A
N
3
SD1.0
VE
R
I
F
Y
W
/
M
A
N
U
F
.
RE
I
N
F
O
R
C
E
D
(E
)
4
x
P
U
R
L
I
N
FACE/ 4x, TYP.
BEAM PER PLAN
METAL CURB TO FRAMING
NOTES:
1. GENERAL CONTRACTOR TO FIELD VERIFY MIN. DEPTH OF LEVELERS
WITH ACTUAL SLOPE AND WIDTH OF NEW METAL CURBS.
MECH. UNIT
CONT. PLYWOOD SHEATHING
(WHERE OCCURS)
(E) PLYWOOD SHEATHING
4x
B.N. TYP.
@ PERIMITER
OF OPENING
3
1
/
2
"
M
I
N
.
PE
N
T
R
A
T
I
O
N
2
1
/
2
"
MI
N
.
3
3
/
4
"
MI
N
.
@
2A
SD
1
.
0
PREFAB. METAL CURB W/ 1/4"Ø
LAG SCREWS @ 24" O.C. (3 MIN. ON SIDE) TYP.
@ PERIMETER (2 1/2" MIN. PENETRATION,
EDGE DISTANCE 1/2", END DISTANCE 1")
FACE OF METAL. PREFAB. CURB
& EDGE OF PLYWOOD
4x WOOD LEVELER W/ 1/2"Ø LAG BOLTS
@ 24" O.C. (COUNTERSUNK)
METAL CURB TO FRAMING
NOTES:
1. GENERAL CONTRACTOR TO FIELD VERIFY MIN. DEPTH OF LEVELERS
WITH ACTUAL SLOPE AND WIDTH OF NEW METAL CURBS.
MECH. UNIT
CONT. PLYWOOD SHEATHING
(WHERE OCCURS)
(E) PLYWOOD SHEATHING
4x8
B.N. TYP.
@ PERIMITER
OF OPENING
3
1
/
2
"
M
I
N
.
PE
N
T
R
A
T
I
O
N
VA
R
I
E
S
PREFAB. METAL CURB W/ 1/4"Ø
LAG SCREWS @ 24" O.C. (3 MIN. ON SIDE) TYP.
@ PERIMETER (2 1/2" MIN. PENETRATION,
EDGE DISTANCE 1/2", END DISTANCE 1")
4x WOOD LEVELER W/ 1/2"Ø LAG BOLTS
@ 24" O.C. (COUNTERSUNK)
2
1
/
2
"
MI
N
.
SIMPON "ST2122" STRAP EA. END
(ON LONG SIDE) EA. SIDE OF MECH.
UNIT (4 TOTAL) (1'-0" FROM CORNERS)
W/ 2-16d @ 4x/ 6x & 2-#12 SCREWS
@ METAL CURB
4x CONT. SHAPED LEVELER
REINFORCEMENT OF EXIST. PURLINS
NOTES:
1. WOOD SCREWS SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUF. INSTALLATION INSTRUCTION
(E) 2x SUBPURLINS
@ 24" O.C.
1
3
/
4
"
2"
(E) 4x14 PURLINS
@ 8'-0" O.C., TYP.
(N) BEAM PER PLAN W/ 2 ROWS OF SIMP. "SDS25500"
SCREWS @ 24" O.C. STAGG.
ALTERNATE: 2 ROWS OF 1/2"Ø THRU BOLT
@ 24" O.C., TYP.
(E) PLYWOOD SHEATHING
4
1
2
3
BOXED BEAM TO BACK-TO-BACK JAMB
TOP TRACK
BACK-TO-BACK STUDS PER
PLAN W/#10 SDS @12" O.C.
STAGGERED TYP. (U.N.O)
#10 @12" O.C. TYP, ALT.
WELDING AS SHOWN
ALT.
C-STUD WHERE
OCCURS
JAMB TRACK
BACK-TO-BACK JAMB ASSEMBLY
#10 SDS @12" O.C
TO FLANGES.
ALT. WELDING AS
SHOWN
#10 SDS TOP TRACK
TO EA. FLANGE
(4)#10 SDS FROM BM
TO FLANGE OF
JAMBEA. SIDE
TYP. #10 @12" O.C.
AT TOP & BOT.
HEADER TRACK
BOX HEADER PER PLAN
(UNPUNCHED)
MIN 16GA TOP & BOT.
HDR TRACK
1/8
2-12
NOTES:
1- PROVIDE MIN 1"
BEARING BEAM TO
POST OR SIMPSON
SSC AS REQUIRED
2- WEB STIFFENERS
ARE REQUIRED AT EA.
END W/(6)#10 SDS TO
WEB JST.
7 NON-LOAD BEARING WALL CONNECTION DETAIL
FIN. FLR.
CEILING
WHERE OCCURS
CEMENT. BD. EA. SIDE
PER ARCH.
WALL FINISH PER
ARCH.
CONTINUOUS 600T162-54
BOTT. TRACK W/ HILTI X-U.
0.157 DIA. WITH 1" MIN.
EMBEDMENT @ 16" O.C.
(ESR-2269)
REFER TO DETAIL
9/SD1.0
600T162-54 TOP
SLIP TRACK W/ (4)
#10d SMS, TYP.
600S162-54 STUD
WALLS @ 16" O.C.
SE
E
A
R
C
H
(E) ROOF SHEATHING
(E) ROOF FRAMING
WHERE OCCURS
8
TOP TRACK CONNECTION DETAIL
(2) #10 SMS ,TYP.
(E) ROOF SHEATHING
(2) 10# SDS CREWS
@ 8" O.C. STAGG. @ EA. R.R.
600S162-54 @16" O.C
(E) R.R. WHERE
OCCURS
(E) ROOF SHEATHING
CONT. 4x F.H. BLK'G
2x R.R. SISTERED TO
(E) R.R. (SEE DETAIL
9-SD1.0)
(2) #10 SMS ,TYP.
600S162-54 @16" O.C
(2) 10# SDS CREWS
@ 8" O.C. STAGG. @ EA. R.R.
(E) R.R. WHERE
OCCURS
OPTION 1
OPTION 2
MIN. (1) BAY BLK'G EA. WAY
PAST POINT OF ANCHORAGE
9
BOX HEADER CONNECTION
BOX HEADER PER
PLAN (UNPUNCHED)
MIN 16GA TOP &
BOT. HDR TRACK
TYP. #10 @12" O.C.
AT TOP & BOT.
HEADER TRACK
TYP. #10 @12" O.C.
AT TOP & BOT.
HEADER TRACK
600S162-54
@32" O.C,TYP.
10
CONNECTION DETAIL
(N) PWD SHT'G TO
MATCH EXISTING LEVEL
(N) 2X10 SISTER TO (E) R.R.
NAILING WHERE
OCCURS
(2) ROWS
OF 16d's
@6" O.C.
STAGGERED
B.N.
(N) R.R. PER PLAN
(N) CURB DETAIL
- SET-3G ESR #4057
- SPECIAL INSPECTION REQUIRED
6" MIN
PER ARCH
PE
R
A
R
C
H
#4 @ 18" O.C. MIN. 6" EMBEDMENT
OF DOWELS INTO EXISTING
CONCRETE W/ SIMPSON SET-3G
EPOXY, ESR #4057. PERIODIC
SPECIAL INSPECTION IS REQ'D.
STUD WALL
PER ARCH.
(WHERE OCCURS)
(E) CONC. SLAB
MIN CONTINUOUS 600T162-54
BOTT. TRACK W/ HILTI X-U.
0.157 DIA. WITH 1" MIN.
EMBEDMENT @ 16" O.C. (ESR-2269)
#4 CONT.
11
A
A
SHEET NO.:
PROJECT MANAGER:
S.W.
DATE:
JOB NO.: 25263
04/07/2026
Pr
o
j
e
c
t
A
d
d
r
e
s
s
:
TE
N
A
N
T
I
M
P
R
O
V
E
M
E
N
T
(
P
H
A
S
E
3
)
29
0
9
D
A
I
M
L
E
R
S
T
R
E
E
T
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
5
Pr
o
j
e
c
t
N
a
m
e
:
543A2
R
E
V
I
S
I
O
N
DA
T
E
DE
S
C
R
I
P
T
I
O
N
6
Core Structure, Inc.
From The Ground Up
STAMPED 04/01/2026
201 E Sandpointe Ave.
Suite #400
Santa Ana, CA 92707
Phone: 949-954-7244
info@corestructure.com
04
/
0
1
/
2
0
2
6
PL
A
N
C
H
E
C
K
C
O
R
R
E
C
T
I
O
N
S
SD1.0
ST
R
U
C
T
U
R
A
L
DE
T
A
I
L
S
YES NO
INSTRUCTIONS:
ORAN GE COUNTY FI RE AUTHORI TY
Plan Submittal Criteria
COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects
and RESIDENTIAL TRACT developments
·Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place.
·Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section.
·If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA.
·In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations.
·Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding
requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602.
Address Suite City
Project Scope/Business Description
1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways,
curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within
300 feet of an active or proposed oil well? Fire Master Plan (PR145)
2. Property is adjacent to a wildland area or non-irrigated native vegetation?
Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124)
3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from
an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170)
4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving
private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475)
5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000
sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable
to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless
classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration
or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses
where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories
with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285)
6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card,
button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan
depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520)
7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment;
industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible
liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium
ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations?
Special Equipment Plan (PR315, PR340-PR382)
8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft
maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if
H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240)
9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard
commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330)
10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a
commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335)
Initial each of the following two items indicating that you have read and understand the statement:
11.*Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is
required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed
Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications.
12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located
in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327—
Initials the building department will determine specific requirements.
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name Signature
Phone Number ( )Date / /
Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA
review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the
applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the
appropriate plans and fees for OCFA review. 10-08-14 EE
COM
SM
SM
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Referral Form
Required for OCFA to review plans upon the request of the Building Department when
the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”.
City / County Official Requesting Review:
City / County Reference #: Date: __________________________________
City / County: _____________________________________ E-Mail: __________________________________
Contact Name: _____________________________________ Phone #: _________________________________
Title: _____________________________________
** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. **
Reason(s) for Review:
Please describe why OCFA Plan Review is or may be required by the City/County :
OCFA COMMENTS:
No further action required on this specific plan type, based
on information provided on: ____/______/______.
Project to be taken in for OCFA Review.
Other:
Name: _________________________________________
Contact #: ______________________________________ Date: _________________________________
OCFA Authorization
Updated: 06/02/2020 rs
Structural Calculations
1
TABLE OF CONTENTS
2
ASCE Hazards Report
Address:
2909 Daimler St
Santa Ana, California
92705
Standard:ASCE/SEI 7-22 Latitude:33.70499
Risk Category:II Longitude:-117.85044
Soil Class:Default Elevation:47.46571452415216 ft
(NAVD 88)
Wind
Results:
Wind Speed 95 Vmph
10-year MRI 66 Vmph
25-year MRI 72 Vmph
50-year MRI 76 Vmph
100-year MRI 81 Vmph
300-year MRI 89 Vmph
700-year MRI 95 Vmph
1,700-year MRI 102 Vmph
3,000-year MRI 106 Vmph
10,000-year MRI 115 Vmph
100,000-year MRI 133 Vmph
1,000,000-year MRI 151 Vmph
Data Source: ASCE/SEI 7-22, Fig. 26.5-1B and Figs. CC.2-1–CC.2-4, and Section 26.5.2
Date Accessed: Fri Jan 30 2026
Page 1 of 5https://ascehazardtool.org/Fri Jan 30 2026
3
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated in accordance with the 7-22 Standard. Wind speeds
correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability =
0.00143, MRI = 700 years). Values for 10-year MRI, 25-year MRI, 50-year MRI and 100-year MRI are Service
Level wind speeds, all other wind speeds are Ultimate wind speeds.
Site is not in a hurricane-prone region as defined in ASCE/SEI 7-22 Section 26.2.
Page 2 of 5https://ascehazardtool.org/Fri Jan 30 2026
4
PGA M : 0.65
SMS : 1.72
SM1 : 1.15
SDS : 1.15
SD1 : 0.77
T L : 8
SS : 1.45
S1 : 0.47
VS30 : 260
Seismic Design Category:D
Multi-Period Design Spectrum
S (g) vs T(s)a
Multi-Period MCE SpectrumR
S (g) vs T(s)a
Two-Period Design Spectrum
S (g) vs T(s)a
Two-Period MCE SpectrumR
S (g) vs T(s)a
Design Vertical Response Spectrum
Vertical ground motion data has not yet been made
available by USGS.
MCE Vertical Response SpectrumR
Vertical ground motion data has not yet been made
available by USGS.
Seismic
DefaultSite Soil Class:
Results:
Page 3 of 5https://ascehazardtool.org/Fri Jan 30 2026
5
Data Accessed: Fri Jan 30 2026
Date Source:
USGS Seismic Design Maps based on ASCE/SEI 7-22 and ASCE/SEI 7-22 Table 1.5-2. Additional data for
site-specific ground motion procedures in accordance with ASCE/SEI 7-22 Ch. 21 are available from USGS.
Page 4 of 5https://ascehazardtool.org/Fri Jan 30 2026
6
The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any
kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or
has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable
sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or
quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation,
relationship, or sponsorship of such third-party content by or from ASCE.
ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent
professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such
professionals in interpreting and applying the contents of this Tool or the ASCE standard.
In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors,
employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential
damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by
law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data
provided by the ASCE Hazard Tool.
Page 5 of 5https://ascehazardtool.org/Fri Jan 30 2026
7
BUILDING INFORMATION
A.General:
Number of stories 1
Building risk category II
Design Code 2025 CBC
Load standard ASCE 7-22
Design Load Combination ASD
B.Lateral Loads Data:
WIND STANDARD ASCE 7-22(Directional Procedure)
Exposure C
Wind Speed V 95
Enclosure Enclosed Building
Velocity pressure qz 0.00256KzKztKeV2 (26.10-1)
Velocity pressure exposure coefficient Kz from (Table 26.10-1)
Directionality Factor Kd 0.85 (Table 26.6-1)
Topographic factor defined Kzt 1 (26.8.2)
Gust Effect Factor G 0.85 (26.11)
Pressures for MWFRS p qGCp – qi(GCpi)(27.3-1)
External pressure coefficient Cp from (Fig. 27.3-1)
Internal pressure coefficient (GCpi)0.18 (Table 26.13-1)}
SEISMIC STANDARD ASCE 7-22(Equivalent Lateral Force Procedure)
Seismic Design Category D (Table 11.6-1)
Importance factor Ie 1 (Table 1.5-2)
Soil Site Class Default (Table 20-3-1)
Response Spectral Acc. (0.2 sec) Ss 1.45
Response Spectral Acc. (1.0 sec) S1 0.47
TL (sec)8
Max. Considered earthquake acc. SMS 1.72 (11.4-1)
Max. Considered earthquake acc. SM1 1.15 (11.4-2)
Design spectral acc. At short period SDS 1.147 (11.4-3)
Design spectral acc. at 1s period SD1 0.767 (11.4-4)
Response modification coefficient R 6.5 (Table 12.2-1)
System overstrength coefficient Ω2.5 (Table 12.2-1)
Approximate fundamental period parameters Ct = 0.02 x = 0.75 (Table 12.8-2)
Building Height (ft)15
Building period T=Ta (sec)0.152 (12.8-8)
Base Shear Adjustment Factor 1
Minimum Cs 0.05 (12.8-6 & 12.8-7)
Maximum Cs 0.774 (12.8-4 & 12.8-5)
Seismic response coefficient Cs 0.176 (12.8-3)
Adjusted Cs 0.176
For allowable stress design V = 0.7CsW 0.123W
vG25.12.25
:
:
:
:
Com pany Core Structure, Inc.
Project TENANT IMPROVEMENT (PHASE 3)
Job No.0
Plan 0
:
:
:
:
Designed NA
Checked NA
Date
Client 0
TIC Structure Design 2025
8
Roof Loads (Load_Roof)
Clay Tile 10 psf
Framing 2.5 psf
Sheathing (1/2" CDX)1.5 psf
Ceiling 2.5 psf
Insulation 1.5 psf
Misc.2 psf
Total De ad Load 20 psf
Liv e Load 20 psf
Total Load 40 psf
Interior Wall (Wall_In)
Insulation 1 psf
Drywall 5 psf
Studs 1 psf
Misc.3 psf
Total De ad Load 10 psf
Exterior Wall (Wall_Ex)
7/8" Stucco 10 psf
Insulation 1 psf
Drywall 2.5 psf
Studs 1 psf
Misc.2.5 psf
Total De ad Load 17 psf
DESIGN LOADS
vG25.12.25
:
:
:
:
Com pany Core Structure, Inc.
Project TENANT IMPROVEMENT (PHASE 3)
Job No.0
Plan 0
:
:
:
:
Designed NA
Checked NA
Date
Client 0
TIC Structure Design 2025
9
LOAD COMBINATIONS
(Load Standard: ASCE 7-22)
id Load case De ad Sds*De ad Liv e Roof
Liv e Snow Wind Se ismic Dire ction
Load
Dur ation
Factor CD
1 D 1 0.9
2 D + L 1 1 1
3 D + Lr 1 1 1.25
4 D + 0.7S 1 0.7 1.15
5 D + 0.75L + 0.75Lr 1 0.75 0.75 1.25
6 D + 0.75L + 0.525S 1 0.75 0.525 1.15
7 D + 0.6W (N)1 0.6 N_S 1.6
8 D + 0.6W (S)1 0.6 S_N 1.6
9 D + 0.6W (E)1 0.6 E_W 1.6
10 D + 0.6W (W)1 0.6 W_E 1.6
11 D + 0.75(0.6W) (N) + 0.75L + 0.75Lr 1 0.75 0.75 0.45 N_S 1.6
12 D + 0.75(0.6W) (S) + 0.75L + 0.75Lr 1 0.75 0.75 0.45 S_N 1.6
13 D + 0.75(0.6W) (E) + 0.75L + 0.75Lr 1 0.75 0.75 0.45 E_W 1.6
14 D + 0.75(0.6W) (W) + 0.75L + 0.75Lr 1 0.75 0.75 0.45 W_E 1.6
15 D + 0.75(0.6W) (N) + 0.75L + 0.525S 1 0.75 0.525 0.45 N_S 1.6
16 D + 0.75(0.6W) (S) + 0.75L + 0.75S 1 0.75 0.525 0.45 S_N 1.6
17 D + 0.75(0.6W) (E) + 0.75L + 0.75S 1 0.75 0.525 0.45 E_W 1.6
18 D + 0.75(0.6W) (W) + 0.75L + 0.75S 1 0.75 0.525 0.45 W_E 1.6
19 0.6D + 0.6W (N)0.6 0.6 N_S 1.6
20 0.6D + 0.6W (S)0.6 0.6 S_N 1.6
21 0.6D + 0.6W (E)0.6 0.6 E_W 1.6
22 0.6D + 0.6W (W)0.6 0.6 W_E 1.6
23 (1.0 + 0.14Sds)D + 0.7ΩE (N)1 0.14 0.7 N_S 1.6
24 (1.0 + 0.14Sds)D + 0.7ΩE (S)1 0.14 0.7 S_N 1.6
25 (1.0 + 0.14Sds)D + 0.7ΩE (E)1 0.14 0.7 E_W 1.6
26 (1.0 + 0.14Sds)D + 0.7ΩE (W)1 0.14 0.7 W_E 1.6
27 (1.0 + 0.105Sds)D + 0.525ΩE (N) + 0.75L + 0.1S 1 0.105 0.75 0.1 0.525 N_S 1.6
28 (1.0 + 0.105Sds)D + 0.525ΩE (S) + 0.75L + 0.1S 1 0.105 0.75 0.1 0.525 S_N 1.6
29 (1.0 + 0.105Sds)D + 0.525ΩE (E) + 0.75L + 0.1S 1 0.105 0.75 0.1 0.525 E_W 1.6
30 (1.0 + 0.105Sds)D + 0.525ΩE (W) + 0.75L + 0.1S 1 0.105 0.75 0.1 0.525 W_E 1.6
31 (0.6 - 0.14Sds)D + 0.7ΩE (N)0.6 -0.14 0.7 N_S 1.6
32 (0.6 - 0.14Sds)D + 0.7ΩE (S)0.6 -0.14 0.7 S_N 1.6
33 (0.6 - 0.14Sds)D + 0.7ΩE (E)0.6 -0.14 0.7 E_W 1.6
34 (0.6 - 0.14Sds)D + 0.7ΩE (W)0.6 -0.14 0.7 W_E 1.6
vG25.12.25
:
:
:
:
Com pany Core Structure, Inc.
Project TENANT IMPROVEMENT (PHASE 3)
Job No.0
Plan 0
:
:
:
:
Designed NA
Checked NA
Date
Client 0
TIC Structure Design 2025
10
Be am ID: 1
Section type:Douglas Fir-Larch No.2
Section name:4x8
Fb(+)/Fb(-) (psi): 900/900 Fv (psi): 180
E (psi): 1600000 Lu (ft): 0
Ignore shear within (d): True Repetitive member : False
Applie d Loads:
Load_Roof 80PLF =4 x (20+20)/2 @ 0' to 8'
POINT @ 4ft (D=900)
SELF WEIGHT 5.95PLF From 0' to 8'
Point Load Location
Factors:
Ct = 1 Cm = 1 CL = 1.00 CF = 1.3 Cfu = 1 Ci = 1 Cr = 1
Re actions:
Support D L Lr S WSN WWE ESN EWE M ax. LC (Down/Up)
1 634 0 160 0 0 0 0 0 794/0
2 634 0 160 0 0 0 0 0 794/0
Code che ck:
Actual Loc.(ft)Allowe d Ratio (%)CD
Moment (lbs-ft)2168 4 2691 81 0.9
Shear (lbs)607 0 2741 22 0.9
Live Deflection 0.021 4 0.267 8 -
Total Deflection 0.138 4 0.4 35 -
Passe d
Max Moment: D
Max Shear: D
Max Deflection: D + Lr
Be am ID: 2
Section type:Douglas Fir-Larch No.2
Section name:4x8
Fb(+)/Fb(-) (psi): 900/900 Fv (psi): 180
E (psi): 1600000 Lu (ft): 0
Ignore shear within (d): True Repetitive member : False
Applie d Loads:
Load_Roof 80PLF =4 x (20+20)/2 @ 0' to 8'
POINT supp#1 of Beam 1 @ 4ft, (D=634 Lr=160)
SELF WEIGHT 5.95PLF From 0' to 8'
Point Load Location
Factors:
Ct = 1 Cm = 1 CL = 1.00 CF = 1.3 Cfu = 1 Ci = 1 Cr = 1
Re actions:
Support D L Lr S WSN WWE ESN EWE M ax. LC (Down/Up)
1 501 0 240 0 0 0 0 0 741/0
2 501 0 240 0 0 0 0 0 741/0
Code che ck:
Actual Loc.(ft)Allowe d Ratio (%)CD
Moment (lbs-ft)2275 4 3737 61 1.25
Shear (lbs)687 0 3806 18 1.25
Live Deflection 0.037 4 0.267 14 -
Total Deflection 0.127 4 0.4 32 -
Passe d
Max Moment: D + Lr
Max Shear: D + Lr
Max Deflection: D + Lr
vG25.12.25
:
:
:
:
Com pany Core Structure, Inc.
Project TENANT IMPROVEMENT (PHASE 3)
Job No.0
Plan 0
:
:
:
:
Designed NA
Checked NA
Date
Client 0
TIC Structure Design 2025
11
Be am ID: 3
Section type:Ve rsa Lam 3100
Section name:3 1/2x11 7/8
Fb(+)/Fb(-) (psi): 3100/3100 Fv (psi): 285
E (psi): 2000000 Lu (ft): 0
Ignore shear within (d): True Repetitive member : False
Applie d Loads:
POINT @ 18.75ft (D=1767)
SELF WEIGHT 9.74PLF From 0' to 23.75'
Point Load Location
Factors:
Ct = 1 Cm = 1 CL = 1.00 Cr = 1 Cv = 1.00
Re actions:
Support D L Lr S WSN WWE ESN EWE M ax. LC (Down/Up)
1 488 0 0 0 0 0 0 0 488/0
2 1511 0 0 0 0 0 0 0 1511/0
Code che ck:
Actual Loc.(ft)Allowe d Ratio (%)CD
Moment (lbs-ft)7432 18.75 19125 39 0.9
Shear (lbs)1511 23.75 7107 21 0.9
Live Deflection 0.000 0 0.792 0 -
Total Deflection 0.598 13.3 1.188 50 -
Passe d
Max Moment: D
Max Shear: D
Max Deflection: D
Be am ID: 4
Section type:Ve rsa Lam 3100
Section name:3 1/2x11 7/8
Fb(+)/Fb(-) (psi): 3100/3100 Fv (psi): 285
E (psi): 2000000 Lu (ft): 0
Ignore shear within (d): True Repetitive member : False
Applie d Loads:
POINT @ 19.5ft (D=932)
SELF WEIGHT 9.74PLF From 0' to 24'
Point Load Location
Factors:
Ct = 1 Cm = 1 CL = 1.00 Cr = 1 Cv = 1.00
Re actions:
Support D L Lr S WSN WWE ESN EWE M ax. LC (Down/Up)
1 292 0 0 0 0 0 0 0 292/0
2 874 0 0 0 0 0 0 0 874/0
Code che ck:
Actual Loc.(ft)Allowe d Ratio (%)CD
Moment (lbs-ft)3835 19.5 19125 20 0.9
Shear (lbs)874 24 7107 12 0.9
Live Deflection 0.000 0 0.8 0 -
Total Deflection 0.333 13.2 1.2 28 -
Passe d
Max Moment: D
Max Shear: D
Max Deflection: D
vG25.12.25
:
:
:
:
Com pany Core Structure, Inc.
Project TENANT IMPROVEMENT (PHASE 3)
Job No.0
Plan 0
:
:
:
:
Designed NA
Checked NA
Date
Client 0
TIC Structure Design 2025
12
LATERAL LOADS ANALYSIS
Project: Job No.: Calc. No.: Designed By:
TENANT IMPROVEMENT (PHASE 3)25263 -
Subject: Checked By:
Equipment Anchorage S.W.
Design for : Rooftop Unit
Seismic Load per: Mechanical and Electrical Component (ASCE 13.6)
Ip (important factor) = 1
MCE short period SS= 1.450
MCE 1 sec. period S1= 0.470
Site Class= Default
SDS= 1.150
ap (amplification factor)= 2.5 (ASCE Table 13.6-1)
Rp (modification factor)= 6 (ASCE Table 13.6-1)
Building height (H)= 15 ft
Equipment anchor elev.(Z)= 3.5 ft
Fp= 0.4x ap x SDS x (1+2x(Z/H)) / (Rp / Ip) x Wp (ASCE Eq. 13.3-1)
= 0.28 Wp
Fp,max.= 1.6 x SDS x Ip x Wp= 1.84 Wp (ASCE Eq. 13.3-2)
Fp,min.= 0.3 x SDS x Ip x Wp= 0.35 Wp (ASCE Eq. 13.3-3)
Using Lateral Force Eh = 0.35 Wp
Wind Load per Method 2 - Analysis Procedure (ASCE 30.10)
Design Wind Load for Rooftop equipment with H < 60 (ASCE 29.4.1)
Wind speed= 95 mph
Risk Catagoly II
Exposure category= C
Topographic factor KZt = 1 (ASCE 26.8.2)
qh (velocity pressure)= 0.00256 Kz Kzt Kd V² I= 17.7 psf (ASCE Eq. 26.10-1)
Kz= 0.9 (ASCE Table 26.10-1)
Kd= 0.85 (ASCE Table 26.6-1)
Fh= qz G Cr Aƒ (ASCE Eq. 29.4-2)
GCr = 1.9
(Af < 0.1 BH)
Fh= 33.6 psf
13
ANCHORAGE DESIGN
Project: Job No.: Calc. No.: Designed By:
TENANT IMPROVEMENT (PHASE 3)25263
Subject:
Equipment Anchorage Checked By: S.W.
ROOFTOP UNIT: 50FEQ-09
Equipment weight = 1767 lb Based on ASCE Table 13.6.1 Ω = 2.5
Anchorage : 4 row Total: 8 LAG BOLTS
Gravity height 3.5 ft
Anchorage space: 4.25 ft
Project area =7.33 ft-w x 5.25 ft-h = 38.48 sq. ft
Load Condition: 06D +0.7ΩE
Lateral Force =0.35 x W= 609.6 lb
Overturn moment = 3733.9 lb-ft
Resistant moment = 2252.93 lb-ft
Required uplift resistant= 87.1 lb/ ea. Bolt
Required sliding resistant= 133.35 lb/ ea. Bolt
Load Condition: 06D +0.6W
Lateral Force =33.58 x Area= 1292 lb
Overturn moment = 2713.8 lb-ft
Resistant moment = 2252.9 lb-ft
Required uplift resistant= 54.2 lb/ ea. Bolt
Required sliding resistant= 96.9 lb/ ea. Bolt
Using 3/8" THRU BOLT for single shear connections
T/W = 826 > 54.2 (OK)
V/W = 390 > 96.9 (OK)
14
ANCHORAGE DESIGN
Project: Job No.: Calc. No.: Designed By:
TENANT IMPROVEMENT (PHASE 3)25263
Subject:
Equipment Anchorage Checked By: S.W.
ROOFTOP UNIT: 50FEQ*05
Equipment weight = 923 lb Based on ASCE Table 13.6.1 Ω = 2.5
Anchorage : 4 row Total: 8 LAG BOLTS
Gravity height 3.5 ft
Anchorage space: 3.25 ft
Project area =5.9 ft-w x 4 ft-h = 23.60 sq. ft
Load Condition: 06D +0.7ΩE
Lateral Force =0.35 x W= 318.4 lb
Overturn moment = 1950.4 lb-ft
Resistant moment = 899.93 lb-ft
Required uplift resistant= 80.8 lb/ ea. Bolt
Required sliding resistant= 69.658 lb/ ea. Bolt
Load Condition: 06D +0.6W
Lateral Force =33.58 x Area= 792.5 lb
Overturn moment = 1664.3 lb-ft
Resistant moment = 899.93 lb-ft
Required uplift resistant= 117.6 lb/ ea. Bolt
Required sliding resistant= 59.4 lb/ ea. Bolt
Using 3/8" THRU BOLT for single shear connections
T/W = 826 > 117.6 (OK)
V/W = 390 > 59.4 (OK)
15
16
17
18
19
20