HomeMy WebLinkAbout600 N Parkcenter Dr - PlanSECTION REFERENCE BUBBLE
DETAIL REFERENCE BUBBLE WITH
ARROW
DETAIL REFERENCE BUBBLE
FULL HEIGHT SECTION
INDICATOR
BUILDING SECTION INDICATOR
ELEVATION OF WALL OR FRAME
NORTH ARROW
X
SX.X
X
SX.X
X
SX.X
X
SX.X
X
SX.X
X
SX.X
X
SX.X
N
?
A
1
REVISION CLOUD AND SYMBOL
GRID SYSTEM
SCOPE OF WORK/SITE PLAN
AMERICAM RED
CROSS BLOOD
DONATION
CENTER
18400 Von Karman Ave., Suite 600
Irvine, CA 92612
O: 949.252.1022
www.kpff.com
Sheet Number
Sheet Name
Project Status
Scale
Drawn By:
Agency Approval
Stamp
Consultant
Job Number:
REVISIONS
Project Title:
Key Plan
Approved By: Checked By:
Issue Date:
Project Address:
12" = 1'-0"
4/
3
/
2
0
2
6
4
:
1
3
:
0
5
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
1
0
2
6
2
5
0
0
2
2
2
-
A
m
er
i
c
a
n
R
e
d
C
r
o
s
s
-
-
S
a
n
t
a
A
n
a
/
2
5
0
0
2
2
2
A
m
e
r
i
c
a
n
R
e
d
Cr
o
s
s
S
A
_
S
2
4
.
r
v
t
S-0.1
COVER SHEET
Project Status
SA 10262500222
AMERICAN RED
CROSS - SANTA ANA
600 N Parkcenter Dr., Santa Ana, CA 92705
WT JW
11/18/2025
SYMBOLS
& AND
@ AT
AB ANCHOR BOLT
ABV ABV
ADDL ADDITIONAL
ADJ ADJACENT
AESS ARCHITECTURALLY EXPOSED STRUCTURAL STEEL
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
ANCH ANCHOR
APPVD APPROVED
APROX APPROXIMATELY
ARCH ARCHITECTURAL; ARCHITECT
(B) OR BOT BOTTOM
BD BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BLW BELOW
BM BEAM
BN BOUNDARY NAIL
BNDRY BOUNDRY
BOF BOTTOM OF FOOTING
BOT OR B/ BOTTOM OF
BRC BRACE
BRCG BRACING
BRG BEARING
BS BOUNDARY SCREW
BT BENT
BTW BETWEEN
BTWN BETWEEN
C OR CAM CAMBER
CALCS CALCULATIONS
CANT CANTILEVER
CBC CALIFORNIA BUILDING CODE
CC CENTER TO CENTER
CF OR CU FT CUBIC FOOT
CG CENTER OF GRAVITY
CIP CAST IN PLACE
CJ CONSTRUCTION JOINT; CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLR CLEARANCE; CLEAR
CMU CONCRETE MASONRY UNIT
CO COMPANY
COL COLUMN
COMP COMPRESSION
CONC CONCRETE
CONN CONNECT; CONNECTION
CONST CONSTRUCTION
CONSTR CONSTRUCTION
CONT CONTINUE; CONTINUOUS
CONTR CONTRACTOR
CTR CENTER
CTSK COUNTERSINK; COUNTERSUNK
d PENNY (NAILS)
db BAR DIAMETER
DBL DOUBLE
DCW DEMAND CRITICAL WELD
DEPT DEPARTMENT
DET DETAIL
DF DOUGLAS FIR/LARCH
DIA OR Ø DIAMETER
DIAG DIAGONAL
DIAPH DIAPHRAGM
DIM DIMENSION
DIR DIRECTION
DIST DISTANCE
DL DEAD LOAD
DN DOWN
DO DITTO
DWG DRAWING
DWL DOWEL
(E) OR EXIST EXISTING
e.g. FOR EXAMPLE
EA EACH
EF EACH FACE
EJ END JACK; EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATION; ELEVATOR
EMB EMBED
EMBED EMBEDMENT
EN END NAIL
ENGR ENGINEER
EOR ENGINEER OF RECORD
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EACH SIDE; EDGE SCREW
ETC ET CETERA
EW EACH WAY
EXT EXTERIOR
f'c CONCRETE COMPRESSION STRENGTH
f'm MASONRY COMPRESSION STRENGTH
F/ FACE OF
Fb ALLOWABLE BENDING STRESS
FD FLOOR DRAIN
FDN FOUNDATION
FF FINISH FLOOR OR FAR FACE
FIN FINISH
FJ FLOOR JOIST
FL FLOOR LINE
FLG FLANGE
FLR FLOOR
FN FIELD NAIL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FIRE PROOF; FULL PENETRATION
FRMG FRAMING
FS FULL SIZE; FAR SIDE; FIELD SCREW
FT FOOT; FEET
FTG FOOTING
Fy YIELD STRENGTH
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GC GENERAL CONTRACTOR
GEN GENERAL
GLB GLUE LAMINATED BEAM
GR GRADE
GRND GROUND
(H) HORIZONTAL
H OR HORIZ HORIZONTAL
HCAI DEPARTMENT OF HEALTHCARE ACCESS AND INFORMATION
HD HOLDOWN
HDR HEADER
HGR HANGER
HI HIGH
HOSP HOSPITAL
HP HIGH POINT OR HEAVY PILING
HR HARD ROCK
HS HIGH STRENGTH
HSH HORIZONTALLY SLOTTED HOLE
HT HEIGHT
I MOMENT OF INERTIA
I-JST I JOIST
i.e. THAT IS
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH
INCL INCLUDE; INCLUDING
INFO INFORMATION
INSP INSPECTION; INSPECTOR
INT INTERIOR
INTERM INTERMEDIATE
INV INVERT
JST JOIST
JT JOINT
k OR KIP 1,000 (e.g. POUNDS)
KO KNOCK OUT
KP KING POST
KSF KIPS PER SQUARE FOOT
KSI KIPS PER SQUARE INCH
# OR LBS POUNDS
(L) LONGITUDINAL
LAB LABORATORY
Ld DEVELOPMENT LENGTH
LDGR LEDGER
Ldh STANDARD HOOK DEVELOPMENT LENGTH
LF LINEAL FOOT
LG LONG
LIN LINEAL; LINEAR
LL LIVE LOAD
LLBB LONG LEGS BACK-TO-BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONGIT LONGITUDINAL
LP LOW POINT
LSL LONG SLOTTED HOLE
Lst TENSION LAP SPLICE LENGTH
LTWT LIGHT WEIGHT
LVL LEVEL
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MDF MEDIUM DENSITY FIBERBOARD
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MTL METAL
# OR NO NUMBER
(N) NEW
N NORTH
NF NEAR FACE
NIC NOT IN CONTRACT
NORM NORMAL
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
ORIG ORIGINAL
OSB ORIENTED STRAND BOARD
// OR PARA PARALLEL
PC PRECAST
PCF POUNDS PER CUBIC FOOT
PCI POUNDS PER CUBIC INCH
PDF POWDER DRIVEN FASTENERS
PE POLYETHYLENE; PROFESSIONAL ENGINEER
PI PLYWOOD INDEX
PJP PARTIAL JOINT PENETRATION
PL PLATE; PROPERTY LINE
PLCS PLACES
PLF POUNDS PER LINEAR FOOT
PLY PLYWOOD
PREFAB PREFABRICATED
PRKG PARKING
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POST TENSION
PTFE POLYTETRAFLOURETHYLENE (TEFLON)
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
PW PLATE WASHER
┴ OR PERP PERPENDICULAR
R OR RAD RADIUS
RD ROOF DRAIN
REF REFERNECE
REG REGULAR
REINF REINFORCE; REINFORCING
REQ OR REQD REQUIRED
RET RETAINING
REV REVISION
RF ROOF
RM ROOM
RO ROUGH OPENING
S ELASTIC SECTION MODULUS
SCHED SCHEDULE
SECT SECTION
SEL SELECT
SEP SEPERATION
SFRS SEISMIC FORCE RESISTING SYSTEM
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SJ SEISMIC JOINT, SIDE JACK
SLBB SHORT LEG BACK-TO-BACK
SMF SPECIAL MOMENT FRAME
SMS SHEET METAL SCREW
SOG SLAB ON GRADE
SPCG SPACING
SPCL SPECIAL
SPECS SPECIFICATIONS
SQ SQUARE
SS SELECT STRUCTURAL; STAINLESS STEEL
SSH SHORT SLOTTED HOLE
SSH SHORT SLOTTED HOLE
STAGG STAGGER
STD STANDARD
STIFF STIFFENER
STIRR STIRRUP
STL STEEL
STRUCT STRUCTURAL
STRUCT I STRUCTURAL I SHEATHING
SW SHEAR WALL
SYM SYMMETRICAL
Σ SUM
(T) TOP
(T) TRANSVERSE
T TOP
T&B TOP & BOTTOM
T&G TONGUE AND GROOVE
T/ TOP OF
TB TIE BEAM
TEMP TEMPORARY; TEMPERATURE
THK THICK
THR THREADED
THRU THROUGH
TL TOTAL LOAD
TN TOE NAIL
TOC TOP OF CONCRETE, TOP OF CURB
TOF TOP OF FOOTING
TOGB TOP OF GRADE BEAM
TOL TOP OF LEDGER
TOS TOP OF STEEL
TOSL TOP OF SLAB
TOW TOP OF WALL
TRANSV TRANSVERSE
TSG TAPERED STEEL GIRDER
TSP TAPERED STEEL GIRDER
TYP TYPICAL
UL UNDERWRITERS LABORATORY, INC
UNO UNLESS NOTED OTHERWISE
UT ULTRASONIC TESTING
(V) VERTICAL
V OR VERT VERTICAL
VIF VERIFY IN FIELD
VSH VERTICAL SLOTTED HOLES
W/ WITH
W/C WATER-CEMENT RATIO
W/O WITHOUT
WD WOOD
WF WIDE FLANGE
WHT OR WT WEIGHT
WP WORK POINT
WWF WELDED WIRE FABRIC
STRUCTURAL STEEL SHAPES
C STANDARD CHANNEL
HP HP SHAPE
HSS HOLLOW STRUCTURAL STEEL
L ANGLES
M M SHAPES
MC MISC CHANLES
PIPE#-STD STANDARD PIPE
PIPE#-XSTRONG EXTRA STRONG PIPE
PIPE#-XXSTRONG DOUBLE EXTRA STRONG PIPE
S S SHAPE
TS TUBE STEEL
W W SHAPE
WT, ST, MT STRUCT TEES CUT FROM W, S, M SHAPES
INSTITUTIONS
ACI AMERICAN CONCRETE INSTITUTE
AISC AMERICAL INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APA AMERICAN PLYWOOD ASSOCIATIONS
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWPA AMERICAN WOOD PRESERVERS ASSOCIATION
AWPB AMERICAN WOOD PERSERVERS BUREAU
AWS AMERICAN WELDING SOCIETY
CRSI CONCRETE REINFORCING STEEL INSTITUTE
ICBO INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS
ICC INTERNATIONAL CODE COUNCIL
ICC-ER ICC-ES LEGACY REPORT
ICC-ES ICC EVALUATION SERVICES
ICC-ESR ICC-ES REPORT
PCI PRECAST CONCRETE INSTITUTE
PTI POST-TENSION CONCRETE INSTITUTE
RCSC RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS
SJI STEEL JOIST INSTITUTE
TPI TRUSS PLATE INSTITUTE
SHEET INDEX
S-0.1 COVER SHEET
S-0.2 GENERAL STRUCTURAL NOTES, TESTING, INSPECTION, AND OBSERVATION
S-1.1 SITE PLAN
S-1.2 FOUNDATION PLAN
S-3.1 STRUCTURAL DETAILS
VICINITY MAP
SCOPE OF WORK
NO DATE DESCRIPTION
N
PROJECT SCOPE OF WORK:
THE PROPOSED PROJECT IS A BUILDING MAINTENANCE
OF THE EXTERIOR WOOD POST.
THE SCOPE OF WORK INCLUDES REVIEW AND
ASSESSMENT OF EXISTING WOOD POST; REMOVE AND
REPLACE DAMAGED POST TO MATCH EXISTING; REPAIR
OF CHIPPED CONCRETE PIERS.
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING
CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES
OR INCONSISTENCIES.
2. ALL DRAWINGS, SPECIFICATIONS AND DOCUMENTS ENUMERATED IN THE
OWNER/CONTRACTOR AGREEMENT ARE CONSIDERED TO BE PART OF THE
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE REVIEW AND COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS
PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO START
OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK
PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE
REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS OWN
EXPENSE AND AT NO EXPENSE TO THE OWNER OR ARCHITECT.
3. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER
GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN,
CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK. WHERE
CONFLICTS BETWEEN DRAWINGS AND THE SPECIFICATIONS OCCUR,
CONSTRUCTION SHALL FOLLOW THE MORE STRINGENT REQUIREMENT
UNLESS OTHERWISE APPROVED BY SEOR.
4. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE
FOLLOWING CODES:
2025 CALIFORNIA BUILDING CODE, CALIFORNIA CODE OF REGULATIONS, TITLE
24, PART 2, VOLUME 2 OF 2 AND LATEST REVISIONS ADOPTED PRIOR TO
PERMITTING REFERRED TO HERE AS “THE CODE”, AND ANY OTHER
REGULATING AGENCIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE
WORK, INCLUDING STATE OF CALIFORNIA DIVISION OF OCCUPATIONAL
SAFETY AND HEALTH (DOSH), AND THOSE CODES & STANDARDS LISTED IN
THESE NOTES AND SPECIFICATIONS.
5. ALL REFERENCED STANDARDS SHALL BE THE VERSION INDICATED IN
CHAPTER 35 OF THE CODE.
6. THE STRUCTURAL CONTRACT DOCUMENTS REPRESENT THE FINISHED
STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION.
CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE
STRUCTURE DURING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO
BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT ETC.
OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER DO NOT
INCLUDE REVIEW OF THE ABOVE ITEMS.
7. INVESTIGATE SITE DURING CLEARING AND EARTHWORK OPERATIONS FOR
FILLED EXCAVATIONS OR BURIED STRUCTURES, SUCH AS CESSPOOLS,
CISTERNS, FOUNDATIONS, ETC. IF ANY SUCH STRUCTURES ARE FOUND,
NOTIFY THE ARCHITECT IMMEDIATELY.
8. OPENINGS, POCKETS, PENETRATIONS, NON-STRUCTURAL EMBEDS, ETC.
SHALL NOT BE PLACED IN ANY STRUCTURAL MEMBER EXCEPT AS NOTED OR
DETAILED ON THESE DRAWINGS. NOTIFY THE STRUCTURAL ENGINEER WHEN
DRAWINGS BY OTHERS SHOW SUCH ITEMS PLACED IN A MANNER THAT IS NOT
CONSISTENT WITH THE STRUCTURAL DRAWINGS.
9. THE CONTRACT STRUCTURAL DRAWINGS SHOW THE BUILDING IN ITS FINAL
INTENDED POSITION. MAKE PROVISIONS IN THE CONSTRUCTION
SEQUENCING OF THE BUILDING TO TAKE INTO ACCOUNTS SHRINKAGE,
CREEP, SHORTENING, THERMAL EXPANSION, ETC.
10. CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED
ROOF OR FLOOR. LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD PER
SQUARE FOOT. PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE
STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH.
11. CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL
CRIBBING, SHEATHING AND SHORING REQUIRED AND SHALL BE SOLELY
RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING LAGGING,
SHORING AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES,
STREETS AND UTILITIES IN ACCORDANCE WITH ALL NATIONAL, STATE AND
LOCAL SAFETY ORDINANCES.
12. COORDINATE AND VERIFY EDGE OF SLAB DIMENSIONS PRIOR TO
FABRICATION OR PLACEMENT OF FORMWORK.
13. OBTAIN AN UNDERGROUND SERVICE ALERT INQUIRY IDENTIFICATION NUMBER
AT LEAST TWO WORKING DAYS BEFORE STARTING WORK WITH THIS PERMIT.
DIAL 811 (OR 1-800-422-4133 FOR SOUTHERN CALIFORNIA PROJECTS)
14. THE CONTRACTOR SHALL VERIFY THE EXTENT AND LOCATIONS OF SITE
UTILITIES PRIOR TO EXCAVATION OR SHORING , THERE MAY BE
DISCREPANCIES BETWEEN THE LOCATION INDICATED ON THE SITE SURVEY
AND ACTUAL VERIFIED LOCATIONS. IF THE ACTUAL FIELD VERIFIED LOCATION
OF UTILITIES COULD RESULT IN A CONFLICT WITH THE NEW CONSTRUCTION
OR SHORING, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY.
15. CONTRACTOR SHALL COORDINATE SHORING WITH DRAWINGS OF RECORD TO
ENSURE PROVISIONS FOR POCKETS, BLOCKOUTS, OFFSETS, STEPPED
FOOTINGS AND ANY OTHER ITEMS AFFECTED BY THE SHORING.
16. CONTRACTOR SHALL SUBMIT PLANS SHOWING ALL PROPOSED OPENINGS
(SIZE & LOCATIONS) TO AOR & SEOR FOR REVIEW AND APPROVAL BEFORE
START OF WORK.
GENERALFOUNDATION
1. FOUNDATION DESIGN BASED ON CODE MINIMUMS.
2. CONVENTIONAL FOUNDATIONS AND SLABS-ON-GRADE SHALL BEAR ON FIRM
NATURAL SOIL OR COMPACTED FILL. ALL UNSUITABLE SOILS SHALL BE
REMOVED AND RECOMPACTED UNDER THE SUPERVISION OF THE
GEOTECHNICAL ENGINEER OR HIS/HER REPRESENTATIVE. REFER TO THE
GEOTECHNICAL REPORT AND PROJECT SPECIFICATIONS FOR EXTENT OF
REMOVAL AND COMPACTION REQUIREMENTS.
3. FOOTINGS ARE DESIGNED BASED ON THE FOLLOWING INFORMATION
PAD FOOTINGS
ALLOWABLE BEARING PRESSURE = 1.500 PSF
BEARING CAPACITY IS BASED ON 24-INCH MINIMUM FOOTING WIDTH AND 24-
INCH MINIMUM FOOTING DEPTH BELOW ADJACENT GRADE.
INCREASE FOR SHORT TERM LOADS
ALLOWABLE BEARING PRESSURES MAY BE INCREASED BY 1/3 WHEN APPLIED
DEAD AND LIVE LOADS ARE COMBINED WITH WIND AND SEISMIC FORCES.
LATERAL RESISTANCE
ALLOWABLE PASSIVE EARTH PRESSURE = 150 PCF
PASSIVE AND FRICTION RESISTANCE MAY BE COMBINED TO RESIST LATERAL
LOADS INCLUDING WIND AND SEISMIC WITHOUT REDUCTION.
4. EXCAVATION FOR FOOTINGS SHALL BE APPROVED BY THE INSPECTOR OR
THE GEOTECHNICAL ENGINEER PRIOR TO PLACING CONCRETE AND
REINFORCING. CONTRACTOR TO NOTIFY THE INSPECTOR OR THE
GEOTECHNICAL ENGINEER WHEN INSPECTION OF EXCAVATION IS READY.
THE INSPECTOR OR THE GEOTECHNICAL ENGINEER TO SUBMIT LETTER OF
COMPLIANCE.
5. REMOVE ALL ABANDONED FOOTINGS, UTILITIES, ETC.
6. FOUNDATIONS SHALL BE PLACED AND ESTIMATED ACCORDING TO DEPTHS
SHOWN ON DRAWINGS. SHOULD SOIL ENCOUNTERED AT THESE DEPTHS NOT
BE APPROVED BY THE INSPECTOR OR SOILS ENGINEER, FOUNDATION
ELEVATIONS WILL BE ALTERED BY CHANGE ORDER.
7. ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE
BACKFILL BEHIND RETAINING WALLS BEFORE CONCRETE OR GROUT HAS
ATTAINED FULL DESIGN STRENGTH. BRACE OR PROTECT ALL BUILDING AND
PIT WALLS BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHING FLOORS
ARE IN PLACE AND HAVE ATTAINED FULL STRENGTH. CONTRACTOR SHALL
PROVIDE FOR DESIGN, PERMITS AND INSTALLATION OF SUCH BRACING.
8. FOOTING BACKFILL AND UTILITY BACKFILL WITHIN BUILDING AREA SHALL BE
MECHANICALLY COMPACTED IN LAYERS IN ACCORDANCE WITH THE SOILS
REPORT AND APPROVED BY THE SOILS ENGINEER. FLOODING WILL NOT BE
PERMITTED. ALL FILLS USED TO SUPPORT FOUNDATIONS SHALL BE
INSPECTED BY THE SOILS ENGINEER REPRESENTATIVE PER CODE SECTION
1705.6 & TABLE 1705.6.
9. PLACE A MOISTURE BARRIER MEMBRANE OVER SAND AND GRAVEL BASE
UNDER SLABS-ON-GRADE PER THE GEOTECHNICAL REPORT, OR AS
INDICATED ON THE DRAWINGS AND PROJECT SPECIFICATIONS.
1. STRUCTURAL OBSERVATION SHALL BE PERFORMED BY THE STRUCTURAL
ENGINEER OF RECORD OR DESIGNEE IN ACCORDANCE WITH SECTION
1704.6 OF THE CODE.
2. STRUCTURAL OBSERVATION IS THE VISUAL OBSERVATION OF THE
ELEMENTS AND CONNECTIONS OF THE STRUCTURAL SYSTEM AT
SIGNIFICANT CONSTRUCTION STAGES AND THE COMPLETED STRUCTURE
FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND
SPECIFICATION. STRUCTURAL OBSERVATION DOES NOT WAVE THE
RESPONSIBILITY FOR THE INSPECTIONS REQUIRED OF THE CITY OR
DEPUTY INSPECTORS.
3. THE CONTRACTOR SHALL COORDINATE AND CALL FOR A PRE-
CONSTRUCTION MEETING BETWEEN THE ENGINEER OR ARCHITECT
RESPONSIBLE FOR THE STRUCTURAL DESIGN. STRUCTURAL OBSERVER,
CONTRACTOR, AFFECTED SUBCONTRACTORS, PROJECT INSPECTOR. THE
PURPOSE OF THE MEETING SHALL BE TO IDENTIFY THE MAJOR
STRUCTURAL ELEMENTS AND CONNECTIONS THAT AFFECT THE VERTICAL
AND LATERAL LOAD SYSTEMS OF THE STRUCTURE AND TO REVIEW
SCHEDULING OF THE REQUIRED OBSERVATIONS.
4. THE STRUCTURAL OBSERVER SHALL PERFORM SITE VISITS AT THOSE
STEPS IN THE PROGRESS OF THE WORK THAT ALLOW FOR CORRECTION OF
DEFICIENCIES WITHOUT SUBSTANTIAL EFFORT OR UNCOVERING OF THE
WORK INVOLVED. AT A MINIMUM, THE FOLLOWING SIGNIFICANT
CONSTRUCTION STAGES REQUIRE A SITE VISIT AND AN OBSERVATION
REPORT FROM THE STRUCTURAL OBSERVER.
CONSTRUCTION STAGES ELEMENTS/CONNECTIONS TO BE
OBSERVED
FOUNDATIONS REINF/CONC/ANCHOR BOLTS
5. THE STRUCTURAL OBSERVER SHALL PREPARE A REPORT FOR EACH
SIGNIFICANT STATE OF CONSTRUCTION OBSERVED. A COPY OF THE
OBSERVATION REPORT SHALL BE SENT TO THE OWNER, CONTRACTOR AND
INSPECTOR OF RECORD (IOR).
STRUCTURAL OBSERVATIONS
1. THE FOLLOWING ELEMENTS OF CONSTRUCTION SHALL HAVE CONTINUOUS
INSPECTION BY A PROJECT INSPECTOR APPROVED BY THE JURISDICTION.
A. CONCRETE.
B. BOLTS INSTALLED IN CONCRETE.
C. PLACING OF REINFORCING STEEL.
D. EXPANSION ANCHORS.
E. EPOXY ANCHORS.
F. HIGH STRENGTH BOLTS.
2. ALL SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE
REQUIREMENTS OF SECTION 1704 OF THE CODE AND ANY ADDITIONAL
REQUIREMENTS STATED IN THESE DRAWINGS AND/OR THE PROJECT
SPECIFICATIONS.
SPECIAL INSPECTIONS
1. TEST AND INSPECTIONS SHALL CONFORM TO THE REQUIREMENTS OF
CHAPTER 17, SECTION 1704 OF THE CODE.
2. CHANGES TO THE APPROVED DRAWINGS AND SPECIFICATIONS SHALL BE
MADE BY AN ADDENDA OR CHANGE ORDER APPROVED BY THE CITY.
3. A PROJECT INSPECTOR EMPLOYED BY THE OWNER AND APPROVED BY THE
CITY SHALL PROVIDE CONTINUOUS INSPECTION OF THE WORK. THE DUTIES
OF THE INSPECTOR ARE DEFINED IN SECTION 4-342, PART 1, TITLE 24
CALIFORNIA CODE OF REGULATIONS.
TEST AND INSPECTION REQUIREMENTS
CONCRETE
1. ALL CONCRETE CONSTRUCTION SHALL CONFORM WITH CHAPTER 19 OF THE
CODE AND WITH THE PROVISIONS OF ACI 318-19.
2. REINFORCED CONCRETE IS DESIGNED BY THE "ULTIMATE STRENGTH DESIGN
METHOD".
3. CONCRETE MIXTURES SHALL BE DESIGNED BY THE APPROVED TESTING
LABORATORY AND REVIEWED BY THE STRUCTURAL ENGINEER. THE
COMPRESSIVE STRENGTH OF THE CONCRETE SHALL BE PROPORTIONED
BASED AS INDICATED ON ACI 318.
4. SCHEDULE OF STRUCTURAL CONCRETE 28-DAY STRENGTH AND TYPES
5. PROVIDE CONCRETE MIXTURES THAT MEET THE DURABILITY REQUIREMENTS
INDICATED IN THE GEOTECHNICAL REPORT AND PROJECT SPECIFICATIONS.
6. CONCRETE SHRINKAGE SHALL BE LIMITED TO 0.05 PERCENT PER ASTM C157.
7. CONCRETE SHALL BE MAINTAINED ABOVE 50 DEGREES FAHRENHEIT AND IN
MOIST CONDITION FOR A MINIMUM OF 7 DAYS AFTER PLACEMENT.
8. CEMENT TYPE PER SCHEDULE ABOVE OR ASTM C-595 FOR TYPE 1L, AS AN
ALTERNATIVE. SEE 03 30 00 CAST-IN-PLACE CONCRETE SPEC FOR MORE
DETAILS.
9. AGGREGATE FOR HARDROCK CONCRETE SHALL CONFORM TO ALL
REQUIREMENTS AND TESTS OF ASTM C-33 AND PROJECT SPECIFICATIONS.
10. CONCRETE MIXING OPERATIONS, ETC. SHALL CONFORM TO ASTM C-94..
11. PLACEMENT OF CONCRETE SHALL CONFORM TO THE CODE CHAPTER 19 AND
PROJECT SPECIFICATIONS. CLEAN AND ROUGHEN TO 1/4" AMPLITUDE ALL
CONCRETE SURFACES AGAINST WHICH NEW CONCRETE IS TO BE PLACED
UNLESS NOTED OTHERWISE.
12. ALL REINFORCING BARS, ANCHOR BOLTS AND OTHER CONCRETE INSERTS,
INCLUDING PIPES AND CONDUITS, SHALL BE SECURED IN POSITION PRIOR TO
PLACING CONCRETE.
13. PROVIDE SLEEVES FOR PIPES AND CONDUITS PASSING THROUGH CONCRETE
MEMBERS INCLUDING CONCRETE OVER METAL DECK BEFORE PLACING. DO
NOT CUT REINFORCING WHICH MAY CONFLICT. SLEEVES SHALL NOT EXCEED
6-INCHES IN DIAMETER AND SHALL BE SPACED A MINIMUM OF 3 DIAMETERS
APART FROM OTHER SLEEVES USING THE LARGER SLEEVE DIAMETER, OR AS
INDICATED ON THE DRAWINGS. CLUSTERS OF SLEEVES ARE NOT PERMITTED
WITHOUT THE PRIOR APPROVAL OF THE STRUCTURAL ENGINEER.
14. CORING IN CONCRETE IS NOT PERMITTED WITHOUT ARCHITECT REVIEW AND
APPROVAL. NOTIFY THE STRUCTURAL ENGINEER IN ADVANCE OF CONDITIONS
NOT SHOWN ON THE DRAWINGS.
15. CONDUITS LARGER THAN 1-1/2" DIAMETER MAY BE EMBEDDED IN
STRUCTURAL CONCRETE WHERE SPECIFICALLY APPROVED BY STRUCTURAL
ENGINEER. UNLESS DETAILED OTHERWISE, EMBEDDED CONDUIT SHALL
CONFORM TO THE FOLLOWING:
A. CONDUITS SHALL NOT DISPLACE OR INTERRUPT REINFORCING
BARS.
B. DO NOT STACK AND/OR CLUSTER CONDUITS.
C. SPACE EMBEDDED CONDUITS A MINIMUM OF 3 DIAMETERS
CLEAR FROM OTHER EMBEDDED CONDUITS USING THE LARGER
CONDUIT DIAMETER.
D. PROVIDE 1-1/2" CLEAR FROM REINFORCING BARS.
E. NO HORIZONTAL CONDUITS SHALL BE PLACED IN CONCRETE
FILL OVER METAL DECK.
F. EMBEDDED CONDUITS SHALL BE PLACE IN THE MIDDLE THIRD
OF SLABS, BEAMS, WALLS, FOOTINGS, ETC.
16. PIPES ARE NOT PERMITTED TO BE EMBEDDED IN CONCRETE.
LOCATION
EXPOSURE
CLASSES MIN
STRENGTH
f'c (PSI)F S W C
MAX
WATER/
CEMENT
RATIO
CEMENT
TYPE
(ASTM C150)
DENSITY
FOOTINGS 4,500 0.45 145II/VC1F0S0W0
WOOD
1. COMPLY WITH THE REQUIREMENTS IN CHAPTER 23 OF THE CODE AND AF&PA'S
WCD 1, "DETAILS FOR CONVENTIONAL WOOD FRAME CONSTRUCTION,"
UNLESS OTHERWISE INDICATED.
2. DIMENSIONAL LUMBER FRAMING:
A. SPECIES, GRADE, AND MOISTURE CONTENT NOTED BELOW:
3. FASTENERS:
A. WHERE ROUGH CARPENTRY IS EXPOSED TO WEATHER, IN GROUND
CONTACT, PRESERVATIVE TREATED, FIRE RETARDANT TREATED, OR IN
AREA OF HIGH RELATIVE HUMIDITY, PROVIDE FASTENERS W ITH HOT-DIP
ZINC COATING COMPLYING WITH ASTM A 153.
B. NAILS: ASTM F1667, COMMON TYPE.
4. WOOD CONNECTORS:
A. PROVIDED BASIS OF DESIGN HANGERS, STRAPS, TIES, HOLD DOWNS, ETC,
AS INDICATED ON THE DRAWINGS.
B. WHERE CONNECTORS ARE IN EXPOSED, EXTERIOR APPLICATIONS OR IN
CONTACT WITH PRESERVATIVE TREATED LUMBER, PROVIDE HOT-DIP
GALVANIZED OR STAINLESS STEEL CONNECTORS.
5. WHERE POSTS OR MULTIPLE STUDS UNDER BEAMS OR HEADERS ARE CALLED
FOR ON DRAWINGS THOSE POSTS OR MULTIPLE STUDS SHALL BE CARRIED TO
THE FOUNDATION/PODIUM LEVEL U.N.O.
6. ALL NAILING/SCREWING SHALL CONFORM TO THE APPLICABLE BUILDING CODE
AND REGULATIONS.
7. ALL BOLT HOLES SHALL BE DRILLED 1/32" TO 1/16" OVERSIZED AND SHALL BE
APPROVED BY THE BUILDING INSPECTOR PRIOR TO COVERING.
8. ALL BOLT HEADS AND NUTS WHICH BEAR AGAINST THE FACE OF WOOD
MEMBERS SHALL BE PROVIDED WITH METAL WASHERS (1/4"x3"x3" MIN).
9. ALL 1/2" DIAMETER AND LARGER BOLTS CALLED OUT ON DRAWINGS,
INCLUDING ANCHOR BOLTS (A.B.) SHALL HAVE STEEL SQUARE PLATE
WASHERS AS LISTED BELOW UNDER THE HEAD AND/OR NUT BEARING ON
WOOD. (ALL ANCHOR BOLTS SHALL BE 12" LONG, UNLESS NOTED OTHERWISE.
10. FRAMING ACCESSORIES AND STRUCTURAL FASTENERS SHALL BE
MANUFACTURED BY SIMPSON STRONG TIE (OR ENGINEER APPROVED EQUAL)
AND OF THE SIZE AND TYPE SHOWN ON THE DRAWINGS. HARDWARE SHALL BE
FULLY NAILED FOR MAXIMUM CAPACITY, UNLESS NOTED OTHERWISE.
11. ALL NAILS CONNECTING WOOD MEMBERS SHALL BE COMMON NAILS. MINIMUM
NAILING REQUIREMENTS OUTLINED IN TABLE 2304.10.1 SHALL BE FOLLOWED
UNLESS OTHERWISE NOTED.
12. RETIGHTEN BOLTS BEFORE CLOSING-IN.
13. ALL HOLD DOWN ANCHORS AND ALL OTHER ANCHORS AND MISCELLANEOUS
METAL HANGERS ARE BY SIMPSON OR APPROVED EQUAL.
DIMENSIONAL LUMBER
USE SPECIES GRADE MOISTURE
CONTENT
LUMBER 2" TO 4" THICK x 5" OR
WIDER (JOISTS/RAFTERS)
DOUGLAS
FIR-LARCH #2 & BETTER KD (15%)
LUMBER 5x5 AND
GREATER (BEAMS)
DOUGLAS
FIR-LARCH #1 S-DRY (19%)
LUMBER 5x5 AND
GREATER (POSTS)
DOUGLAS
FIR-LARCH #1 S-DRY (19%)
WASHER - THICKNESS
WASHER - WIDTH
BOLT DIAMETER
2 3/4"
5/16"1/4"
2 1/2"
1/2" 5/8"
7/16"3/8"
3" 3 1/2"
3/4" 7/8"
1/2"
4"
1"
1. ALL EXPANSION TYPE ANCHORS SHALL CONSIST OF HILTI KWIK BOLT TZ2
CONCRETE ANCHORS PER ICC ESR-4266 REPORT. INSTALLATION SHALL BE IN
CONFORMANCE WITH THE ICC REPORT.
2. ALL EPOXY TYPE ANCHORS SHALL CONSIST OF HILTI HIT HY-200 HYBRID
ADHESIVE USED IN CONJUNCTION WITH DEFORMED REINFORCING BARS PER
ICC REPORT ESR-3187. INSTALLATION OF ANCHORS SHALL BE IN
CONFORMANCE WITH THE ICC REPORT.
3. WHEN INSTALLING DRILLED IN ANCHORS IN EXISTING NON-PRESTRESSED
REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR
DAMAGING THE EXISTING REINFORCING BARS.
4. THE SPECIAL INSPECTOR MUST BE ON THE JOBSITE PERIODICALLY DURING
ANCHOR INSTALLATION TO VERIFY ANCHOR TYPE, ANCHOR DIMENSIONS,
CONCRETE TYPE, CONCRETE COMPRESSIVE STRENGTH, PREDRILLED HOLE
DIMENSIONS, ANCHOR SPACING, EDGE DISTANCES, SLAB THICKNESS,
ANCHOR EMBEDMENT AND TIGHTENING TORQUE.
5. TEST ALL POST-INSTALLED ANCHORS AS REQUIRED PER SECTION 1705 OF
THE CODE.
6. ALL WEDGE ANCHORS SHALL BE CARBON STEEL, UNO. USE STAINLESS
STEEL ANCHORS IN EXTERIOR EXPOSURE AND DAMP ENVIRONMENTS.
POST-INSTALLED CONCRETE ANCHORS
1. REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF CHAPTER
19 OF THE CODE, ASTM 706, GRADE 60 (UNO). DEFORMATIONS SHALL BE IN
ACCORDANCE WITH ASTM A-305.
2. BARS SHALL BE CLEAN OF RUST GREASE OR OTHER MATERIALS LIKELY TO
IMPAIR BOND. ALL REINFORCING BAR BENDS SHALL BE MADE COLD.
3. DETAIL, FABRICATE, AND INSTALL REINFORCING IN ACCORDANCE WITH THE
REQUIREMENTS OF ACI 301, ACI 117, AND THE "CRSI MANUAL OF STANDARD
PRACTICE."
4. REINFORCING BAR SPLICES SHALL BE MADE AS INDICATED ON THE
DRAWINGS. MINIMUM SPLICE LENGTH FOR REINFORCING STEEL BARS IN
MASONRY SHALL BE 72 BAR DIAMETERS, 36" MINIMUM. MINIMUM SPLICE
LENGTH FOR REINFORCING STEEL BARS IN CONCRETE SHALL BE AS
REQUIRED FOR CLASS B SPLICE PER ACI 318 SECTION 25.5.2 UNO. LAP ALL
HORIZONTAL BARS AT CORNERS AND INTERSECTIONS.
5. ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN
THE FINAL IN-PLACE INSPECTION IS MADE.
6. COMPLETE AND DETAILED REINFORCING PLACEMENT DRAWINGS SHALL BE
PREPARED AND SUBMITTED TO THE ARCHITECT FOR REVIEW BY THE
STRUCTURAL ENGINEER PRIOR TO FABRICATION IN ACCORDANCE WITH THE
SPECIFICATIONS AND APPLICABLE CODES. THESE DRAWINGS SHALL BE
AVAILABLE ON THE JOB SITE PRIOR TO PLACING OF CONCRETE.
7. MILL TEST REPORTS FOR GRADE 60 BARS SHALL BE SUBMITTED PRIOR TO
PLACEMENT OF CONCRETE.
8. CONTINUOUS INSPECTION OF CONCRETE SHALL INCLUDE INSPECTION
DURING INSTALLATION OF REINFORCING STEEL. INSPECTION SHALL BE
SCHEDULED SO THAT PLACEMENT OF REINFORCING STEEL, CONDUIT
SLEEVES AND EMBEDDED ITEMS MAY BE CORRECTED PRIOR TO PLACEMENT
OF OVERLYING GRIDS OF REINFORCING STEEL.
9. CONCRETE PROTECTION FOR REINFORCEMENT:
REINFORCING STEEL
CAST-IN-PLACE CONCRETE: THE FOLLOWING MINIMUM CONCRETE COVER
SHALL BE PROVIDED FOR REINFORCEMENT:
CONCRETE CAST AGAINST AND PERMANENTLY
EXPOSED TO EARTH
#6 & LARGER
CONCRETE EXPOSED TO EARTH OR WEATHER
MINIMUM
COVER
3"
2"
#5 & SMALLER 1 1/2"
#14 & LARGER
SLABS, WALLS, OR JOISTS NOT EXPOSED TO
WEATHER OR IN CONTACT WITH THE GROUND
1 1/2"
#11 & SMALLER 3/4"
BEAM AND COLUMN TIES & STIRRUPS NOT EXPOSED TO
WEATHER OR IN CONTACT WITH GROUND
1 1/2"
SPECIAL INSPECTION NOTES:
1. OWNER WILL RETAIN A QUALIFIED, INDEPENDENT SPECIAL INSPECTION AGENCY TO
PERFORM SPECIAL INSPECTIONS AND TESTS PER CHAPTER 17 OF THE CODE. REFER
TO THE TABLES 1 AND 2 FOR TESTS AND INSPECTIONS THAT WILL BE PERFORMED.
2. THE SPECIAL INSPECTOR WILL OBSERVE THE INDICATED WORK FOR COMPLIANCE
WITH THE APPROVED CONSTRUCTION DOCUMENTS. ALL NON-CONFORMING WORK
WILL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR FOR CORRECTION AND
NOTED IN THE INSPECTION REPORTS.
3. TESTING FREQUENCIES IDENTIFIED IN THE STATEMENT OF SPECIAL INSPECTION ARE
DEFINED AS FOLLOWS:
A. CONTINUOUS: THE FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL
INSPECTION BY THE SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE
THE WORK IS BEING PERFORMED.
B. PERIODIC: THE PART-TIME OR INTERMITTENT OBSERVATION OF WORK REQUIRING
SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA
WHERE THE WORK HAS BEEN OR IS BEING PERFORMED AND AT THE COMPLETION
OF THE WORK.
C. OBSERVE: THE SPECIAL INSPECTOR WILL OBSERVE THESE ITEMS ON A RANDOM
BASIS. OPERATIONS NEED NOT BE DELAYED PENDING THESE INSPECTIONS.
D. PERFORM: THE SPECIAL INSPECTOR WILL PERFORM THESE TASKS FOR EACH
ELEMENT.
E. DOCUMENT: THE SPECIAL INSPECTOR WILL DOCUMENT IN A REPORT THAT THE
WORK HAS BEEN PERFORMED IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS.
CONTRACTOR RESPONSIBILITY:
1. THE CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF THE MAIN
WIND/SEISMIC FORCE RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR A
WIND/SEISMIC FORCE RESISTING COMPONENT LISTED IN TABLE 1 SHALL SUBMIT A
WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE
OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT.
THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN THE
FOLLOWING:
A. ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS
CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS.
B. ACKNOWLEDGEMENT THAT CONTROL WILL BE EXERCISED TO OBTAIN
CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS APPROVED BY THE
BUILDING OFFICIAL.
C. PROCEDURES FOR EXERCISING CONTROL WITHIN THE CONTRACTOR'S
ORGANIZATION INCLUDING THE METHOD AND FREQUENCY OF REPORTING AND
DISTRIBUTION OF THE REPORTS.
D. IDENTIFICATION AND QUALIFICATIONS OF THE PERSON(S) EXERCISING SUCH
CONTROL AND THEIR POSITION(S) IN THE ORGANIZATION.
SPECIAL INSPECTIONS AND TESTING
TABLE 1 - REQUIRED SPECIAL INSPECTIONS
INSPECTION
SYSTEM OR MATERIAL
CODE
REFERENCE
REMARKS
CONCRETE
1. INSPECT REINFORCEMENT AND VERIFY PLACEMENT
3. INSPECT ANCHORS CAST IN CONCRETE
4. INSPECT ANCHORS POST-INSTALLED IN HARDENED
CONCRETE MEMBERS.
A. ADHESIVE ANCHORS INSTALLED IN
HORIZONTALLY OR UPWARDLY INCLINED
ORIENTATION TO RESIST SUSTAINED TENSION
LOADS.
B. MECHANICAL ANCHORS AND ADHESIVE ANCHORS
NOT DEFINED IN 4A.
5. VERIFY USE OF REQUIRED DESIGN MIX
6. PRIOR TO CONCRETE PLACEMENT, FABRICATE
SPECIMENS FOR STRENGTH TEST, PERFORM SLUMP
AND AIR CONTENT TESTS, AND DETERMINE THE
TEMPERATURE OF CONCRETE.
7. INSPECT CONCRETE PLACEMENT FOR PROPER
APPLICATION TECHNIQUES.
8. VERIFY MAINTENANCE OF SPECIFIED CURING
TEMPERATURE AND TECHNIQUES.
ACI 318 CHAPTER 20,
25.2 - 25.3,
26.6.1 - 26.6.3
TOLERANCE AND REINFORCING
PLACEMENT PER ACI 318, SECTION 26.6.2
1705.3
ACI 318 17.8.2
CONTINUOUS
INSPECTION REQUIREMENTS PER ICC
EVALUATION REPORT.
VERIFY THAT ADHESIVE ANCHORS
INSTALLED IN HORIZONTALLY OR
UPWARDLY INCLINED ORIENTATION
ARE INSTALLED BY CERTIFIED
INSTALLERS.
ACI 318 17.8.2.4
ACI 318 17.8.2
1904.1, 1904.2, ACI 318 CH 19,
26.4.3, 26.4.4
CONTINUOUS
CONTINUOUS
ASTM C172
ASTM C31
ACI 318 26.5, 26.12
ACI 318 26.5
ACI 318 26.5.3 - 26.5.51908.9
VERIFY THAT ALL MIXES USED
COMPLY WITH APPROVED
CONSTRUCTION DOCUMENTS AND
REFERENCED CODES AND
STANDARDS
REFERENCED
STANDARDS
INSPECTION
TYPE
PERIODIC
PERIODIC
PERIODIC
PERIODIC
PERIODIC
TABLE 2 - REQUIRED TESTING FOR SPECIAL INSPECTIONS
TESTING
GEOTECHNICAL
SYSTEM OR MATERIAL REMARKS
CODE
REFERENCE
REFERENCED
STANDARDS
CLASSIFICATION AND
TESTING OF
CONTROLLED FILL
MATERIAL
MATERIAL VERIFICATION
CONCRETE
CONCRETE STRENGTH ASTM C39
CONCRETE SLUMP ASTM C143
CONCRETE AIR CONTENT ASTM C231
CONCRETE TEMPERATURE ASTM C1064
FABRICATE SPECIMENS AT TIME FRESH CONCRETE IS
PLACED. TEST EACH 150 CY NOR LESS THAN EACH
5000 SF OF SLAB OR WALL PLACED EACH DAY
1705.6
1903
1705.3
1. BUILDING DATA:
PROJECT ADDRESS: 600 N PARKCENTER DR, SANTA ANA, CA 92705
EXISTING BUILDING:
CONSTRUCTION TYPE: V-B
SPRINKLERS: N/A
OCCUPANCY: B (EXISTING TO REMAIN)
DESIGN CRITERIA
18400 Von Karman Ave., Suite 600
Irvine, CA 92612
O: 949.252.1022
www.kpff.com
Sheet Number
Sheet Name
Project Status
Scale
Drawn By:
Agency Approval
Stamp
Consultant
Job Number:
REVISIONS
Project Title:
Key Plan
Approved By: Checked By:
Issue Date:
Project Address:
12" = 1'-0"
4/
3
/
2
0
2
6
4
:
1
3
:
0
9
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
1
0
2
6
2
5
0
0
2
2
2
-
A
m
er
i
c
a
n
R
e
d
C
r
o
s
s
-
-
S
a
n
t
a
A
n
a
/
2
5
0
0
2
2
2
A
m
e
r
i
c
a
n
R
e
d
Cr
o
s
s
S
A
_
S
2
4
.
r
v
t
S-0.2
GENERAL STRUCTURAL
NOTES, TESTING,
INSPECTION, AND
OBSERVATION
Project Status
SA 10262500222
AMERICAN RED
CROSS - SANTA ANA
600 N Parkcenter Dr., Santa Ana, CA 92705
WT JW
11/18/2025
NO DATE DESCRIPTION
1 2026.04.06 PLAN CHECK RESPONSE 1
1
1
EXISTING BUILDING
EXISTING BUILDING
EXISTING STORAGE EXISTING STORAGE
RA
M
P
U
P
GOLDEN CIRCLE
PA
R
K
C
E
N
T
E
R
D
R
I
V
E
EXISTING PARKING
EXISTING PARKING
EXISTING PARKING
EXISTING PARKING
NOT WITHIN SCOPE
SEE 1/S-1.2
306'-0"*
EXISTING TRASH
ENCLOSURE 10'-0"*
EXISTING
ACCESSIBILITY
PARKING
EXISTING
ACCESSIBILITY
PARKING
EXISTING PLANTEREXISTING PLANTER
8
'
-
0
"
*
19'-0"*
67'-0"*
EXISTING
CONCRETE WALK
17
'
-
0
"
*
10
'
-
0
"
*
EXISTING
ACCESSIBILITY
PARKING
EXISTING
CONCRETE WALK
147'-0"*
EXISTING PLANTER
8'
-
0
"
*
EXISTING PLANTER
* DIMENSIONS TO BE VERIFY IN FIELD.
EXISTING
CONCRETE WALK
EXISTING PLANTER
25
'
-
0
"
*
67
'
-
0
"
*
29'-0"*
EXISTING PLANTER
EXISTING
CONCRETE WALK
EXISTING PLANTER
30
'
-
0
"
*
70
'
-
0
"
*
EXISTING PLANTER
29
7
'
-
0
"
*
18400 Von Karman Ave., Suite 600
Irvine, CA 92612
O: 949.252.1022
www.kpff.com
Sheet Number
Sheet Name
Project Status
Scale
Drawn By:
Agency Approval
Stamp
Consultant
Job Number:
REVISIONS
Project Title:
Key Plan
Approved By: Checked By:
Issue Date:
Project Address:
1" = 20'-0"
4/
3
/
2
0
2
6
4
:
1
3
:
1
3
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
1
0
2
6
2
5
0
0
2
2
2
-
A
m
er
i
c
a
n
R
e
d
C
r
o
s
s
-
-
S
a
n
t
a
A
n
a
/
2
5
0
0
2
2
2
A
m
e
r
i
c
a
n
R
e
d
Cr
o
s
s
S
A
_
S
2
4
.
r
v
t
S-1.1
SITE PLAN
Project Status
ELG 10262500222
AMERICAN RED
CROSS - SANTA ANA
600 N Parkcenter Dr., Santa Ana, CA 92705
WT JW
11/18/2025
NO DATE DESCRIPTION
SCALE : 1" = 20'-0"1 SITE PLAN
N
EXISTING BUILDING
(E) 6x6 POST
& (E) FTG
TYP, UNO
(E) 6x6 POST (ABOVE) &
(E) 6x12 BEAM (ABOVE)
TYP @ (8) LOCATIONS
P1: O
P2: S
P3: S
P4: S
P5: O
P6: B
P7: B
P8: B
P9: B
P10: B
P11: F
P12: F
P13: X
P14: O
P15: O
P16: X, B
P17: O
P18: X, B
P19: O
P20: O
P21: O
P22: X, F
P23: O
P24: O
P25: O
P26: O
P27: O
P28: O
P30:
O
P32:
O
P33:
X
P34:
O
P35:
B
P36:
X
P37:
B
P38:
S
P39:
S
P40:
S
P42:
B
P43:
S
P44:
O
P45:
O
P46:
S
'
P29:
O
P31:
S
P41:
X
,
B
P47:
X
,
B
P48:
O
P49:
B
P50:
O
P51:
X
,
B
P52:
X
,
B
P53:
X
,
B
P54:
O
P55:
O
C1:
R
C2:
O
C3:
O
C4:
O
C5:
O
C6:
O
C7:
R
C8:
R
1234567891011121314151617
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
I.5
I.8
J.5
K.9
L.9
M.9
N.9
15.8 9.9 9.5 7.37.8 5.35.7 3.7 3.3
(VIF)
6' - 0"
(VIF)
19' - 0"
(VIF)
6' - 0"
(VIF)
13' - 0"
(VIF)
6' - 2"
(VIF)
6' - 0"
(VIF)
6' - 0"
(VIF)
11' - 10"
(VIF)
6' - 0"
(VIF)
11' - 10"
(VIF)
6' - 0"
(VIF)
11' - 10"
(VIF)
6' - 0"
(VIF)
11' - 10"
(VIF)
6' - 0"
(VIF)
6' - 0"
(V
I
F
)
6'
-
0
"
(V
I
F
)
6'
-
0
"
(V
I
F
)
14
'
-
2
"
(V
I
F
)
6'
-
0
"
(V
I
F
)
14
'
-
2
"
(V
I
F
)
6'
-
0
"
(V
I
F
)
14
'
-
2
"
(V
I
F
)
6'
-
1
0
"
(V
I
F
)
14
'
-
2
"
(V
I
F
)
6'
-
0
"
(V
I
F
)
14
'
-
2
"
(V
I
F
)
6'
-
0
"
(V
I
F
)
14
'
-
2
"
(V
I
F
)
6'
-
0
"
(V
I
F
)
14
'
-
2
"
(V
I
F
)
6'
-
0
"
(V
I
F
)
6'
-
2
"
(VIF)
6' - 0"
(VIF)
13' - 0"(VIF)
10"
(VIF)
6' - 0"
(VIF)
5' - 0"
(VIF)
6' - 0"
(VIF)
2' - 0"
(VIF)
6' - 0"
(VIF)
3' - 10"
(VIF)
6' - 0"
(VIF)
3' - 2"
(VIF)
6' - 0"
(VIF)
2' - 8"
(VIF)
6' - 0"
(VIF)
4' - 4"
(VIF)
5' - 0"
(VIF)
2' - 6"
(VIF)
6' - 0"
(V
I
F
)
1'
-
0
"
(V
I
F
)
5'
-
0
"
(V
I
F
)
1'
-
0
"
(V
I
F
)
13
'
-
2
"
(V
I
F
)
2'
-
0
"
(V
I
F
)
4'
-
0
"
(V
I
F
)
2'
-
0
"
(V
I
F
)
12
'
-
2
"
(V
I
F
)
3'
-
0
"
(V
I
F
)
3'
-
1
0
"
(V
I
F
)
2'
-
2
"
(V
I
F
)
6'
-
0
"
LEGEND FOR EXISTING POST
O = ACCEPTABLE CONDITION
S = POST IS CRACKING, SCREW AND FILL PER
X = UNACCEPTABLE POST CONDITION, REMOVE POST AND REPLACE PER
B = BASE NEEDS COSMETIC FIX. CHIP/REMOVE LOOSE MATERIAL UNTIL SOLID ADHESION CAN BE OBTAIN.
FORM TO MATCH (E) PLINTHS AND FILL WITH NON-SHRINK GROUT. DO NOT OVER-CHIP (E) PLINTHS
BELOW GRADE. DO NOT FORM ABOVE (E) PLINTHS.
F = UNACCEPTABLE FOOTING CONDITION, REMOVE FOOTING AND REPLACE PER
' = PROVIDE ADDITIONAL L-BRACKET EA SIDE OF POST AT ROOF BEAM
LEGEND FOR EXISTING CANTILEVER BEAMS
O = ACCEPTABLE CONDITION
R = PROVIDE ADDITIONAL SUPPORT PER
* = PROVIDE ADDITIONAL SIMPSON LTP4 EA SIDE OF (E) CANTILEVER TO (E) POST CONNECTION
10 S-3.110/
1 S-3.11/
9 S-3.19/
8 S-3.18/
18400 Von Karman Ave., Suite 600
Irvine, CA 92612
O: 949.252.1022
www.kpff.com
Sheet Number
Sheet Name
Project Status
Scale
Drawn By:
Agency Approval
Stamp
Consultant
Job Number:
REVISIONS
Project Title:
Key Plan
Approved By: Checked By:
Issue Date:
Project Address:
As indicated
4/
3
/
2
0
2
6
4
:
1
3
:
1
4
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
1
0
2
6
2
5
0
0
2
2
2
-
A
m
er
i
c
a
n
R
e
d
C
r
o
s
s
-
-
S
a
n
t
a
A
n
a
/
2
5
0
0
2
2
2
A
m
e
r
i
c
a
n
R
e
d
Cr
o
s
s
S
A
_
S
2
4
.
r
v
t
S-1.2
FOUNDATION PLAN
Project Status
SA 10262500222
AMERICAN RED
CROSS - SANTA ANA
600 N Parkcenter Dr., Santa Ana, CA 92705
WT JW
11/18/2025SCALE : 1/8" = 1'-0"1 FOUNDATION PLAN
NO DATE DESCRIPTION
N
EXISTING POST ASSUMED
TO BE 6x6 DF #1 POST (VIF)
2
2026.04.092 PLAN CHECK RESPONSE 2
(E) 6x BEAM
(E) 6x BEAM
(E) ROOF
FRAMING
6x6 POST TO REPLACE THE
(E) POST AT LOCATIONS
INDICATED ON SITE PLAN.
TEMPORARY SHORE BEAMS
PER
(E) CONC
WALKWAY
(E) FOOTING
(E) ROOF
SHEATHING
3
S-3.1
6"
M
A
X
A
B
V
G
R
A
D
E
1"
M
I
N
A
B
V
C
O
N
C
STEEL POST BASE W/
(2) 1/2" Ø THRU BOLTS
THRU BOLTS
PER
T-STRAP
PER
7
S-3.1
5
S-3.1
(E) 6x BEAM
(E) 6x BEAM
(E) CONC
WALKWAY
2x8 BLOCKS NAILED TO BEAM AND
POST. ANGLE POST FOR TIGHT FIT
OR SHIM
SHORING POST
ENGINEERED PLASTIC SHIMS
DRIVEN FOR TIGHT FIT SHORING
POST
4x6 BLOCK
2x8 BLOCKS NAILED TO UNDER
SIDE OF THE BEAM AND TO TOP
OF POST W/ DUPLEX HEAD NAILS
UTILIZE POSTS BEHIND REMOVED
FRO SHORING POSTS. CONFIRM
ENDS ARE COMPETENT OR CUT
OFF TO COMPETENT WOOD
ENGINEERED PLASTIC SHIMS DRIVEN
FOR TIGHT FIT SHORING POST
4x6 BLOCK
18"
(E) 6x BEAM
6x6 POST
3/4"⌀THRU BOLTS
18" 'T' PLATE AT BEAM SPLICE.
8" 'T' PLATE AT CONT BEAM
(2) 6" L'S AT CORNER POSTS
STAGGERED 1" VERT
(E) 6x BEAM
6x6 POST
3/4"⌀THRU BOLTS
8"
BEAM SPLICE
CONTINUOUS BEAM
(E) 6x BEAM
6x6 POST
(3) 7/8"⌀THRU BOLTS W/
STANDARD CUT WASHERS
3"
3"
3"
(E) BEAM SPLICE TO
REMAIN UNCHANGED
(E) 6x BEAM
PT 6x6 POST
(E) CONC
WALKWAY(E) PAVEMENT
12"⌀PILE FOOTING
x 18" DEEP
(E) 6x POST
(E) THRU
BOLTS
3"
C
L
R
CLR
3"
(3) #4 TIES
EQUALLY SPACED
(4) #5 VERT BARS
(N) SIMPSON 'CBS'
(N) SIMPSON 'CCQ'
1'-0" MAX
(E) 12"Ø CONC PIER TO BE
REMOVED TO TOP OF PAD
FOOTING AND REPLACED
AT LOCATIONS INDICATED
ON SITE PLAN. SLOPE TOP
OF PIER 1/2" FROM POST TO
EDGE OF PIER
CL
R
1"
4"
PA
D
F
T
G
(E
)
C
O
N
T
O
R
EM
B
E
D
4"
(N) 12"Ø CONC PIER W/
SIMPSON 'CB66' CONNECTOR
W/ 1/2"Ø THRU BOLTS &
(3) #3 TIES AS SHOWN
1/2" RADIUS
DOWEL
POST TO BE REMOVED
AND REPLACED AT
LOCATIONS INDICATED
ON SITE PLAN
(4) #5 BARS W/ HITI 'HY-200' EPOXY
ADHESIVE W/ DEPUTY SPECIAL
INSP REQ'D (ICC -ES ESR-3187)
NOTES:
1. NEW CONCRETE SHALL BE 4500 PSI AND TYPE V CEMENT W/
NO SPECIAL INSPECTION.
2. SEE DETAIL FOR ADDITIONAL INFORMATION REGARDING
POST REMOVAL AND REPLACEMENT.
(E) CONC WALK
8A
S-3.1
3 S-3.13/
EM
B
E
D
3"
TY
P
2"
1' - 6" SQ
(E) CONC WALK
SAWCUT, REMOVE
AND REPLACE (E)
SIDEWALK
AT NEW PIER
#3 TIGHT FIT DOWELS
AT MIDHEIGHT OF
SLAB
NEW CONC PIER,
POST BASE AND,
IF RQ'D, POST
1' - 0"
1' - 0" SQ
(E) 6x6 POST
#10 WOOD SCREW W/
CSK HEAD, FILL HOLE W/
WOOD PUTTY AS NEEDED
(E) CHECK
WITHIN POST
WHERE OCCURS
18400 Von Karman Ave., Suite 600
Irvine, CA 92612
O: 949.252.1022
www.kpff.com
Sheet Number
Sheet Name
Project Status
Scale
Drawn By:
Agency Approval
Stamp
Consultant
Job Number:
REVISIONS
Project Title:
Key Plan
Approved By: Checked By:
Issue Date:
Project Address:
As indicated
4/
3
/
2
0
2
6
4
:
1
3
:
1
8
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
1
0
2
6
2
5
0
0
2
2
2
-
A
m
er
i
c
a
n
R
e
d
C
r
o
s
s
-
-
S
a
n
t
a
A
n
a
/
2
5
0
0
2
2
2
A
m
e
r
i
c
a
n
R
e
d
Cr
o
s
s
S
A
_
S
2
4
.
r
v
t
S-3.1
STRUCTURAL DETAILS
Project Status
SA 10262500222
AMERICAN RED
CROSS - SANTA ANA
600 N Parkcenter Dr., Santa Ana, CA 92705
WT JW
11/18/2025
S-3.1 1" = 1'-0"
1 POST REPLACEMENT
S-3.1 1" = 1'-0"
3 SECTION AT TEMPORARY SHORING
S-3.1 1 1/2" = 1'-0"
5 EXISTING ROOF POST CONNECTION
S-3.1 1 1/2" = 1'-0"
7 EXTERIOR DECK BEAM CONNECTION
S-3.1 1 1/2" = 1'-0"
9 POST AT EXISTING CANTILEVER BEAM
S-3.1 1" = 1'-0"
8 REPLACEMENT CONCRETE PIER
8A PLAN VIEW
S-3.1 1 1/2" = 1'-0"
10 SCREW AND FILL POST
NO DATE DESCRIPTION
WT
WT
CITY OF SANTA ANA
Planning and Building Agency
f,Rf ORANGE COUNTY FIRE AUTHORIT �6EC y Approved
Plan Referral Form FOR PERMIT ISSUANCE
4 Required for OCFA to review plans upon the request of the Building Department whe
�OTHon<`� the answers on the Plan Submittal Criteria Form (on the reverse) are all "No".
City / County Official Requesting Review:
City / County Reference #:
City/County:
Contact Name:
Title:
Date:
E-Mail:
Phone #:
** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. **
Reason(s) for Review:
Please describe why OCFA Plan Review is or may be required by the City/County:
OCFA COMMENTS:
OCFA Authorization
ElNo further action required on this specific plan type, based
on information provided on:
❑ Project to be taken in for OCFA Review.
Other
Name:
Contact #:
Date:
Updated: 06/02/2020 rs