Loading...
HomeMy WebLinkAbout10135992.pdfORO rw B Pt ISION MAS713k LD,. ell as DISCR. ACTIONTYPE: DRIVEWAY Landscape T'Lars'R YE- C, Pbr LAI '7' TRA' A4 YES; N 0 CONTACT CONTACT PHONE (714) 667,2700 pT, sual WIPONS BELOW. - Room Mom' M-na Sq. Ft. All 17 ,tite -., ,1-1 L A L4 �v Alt, F- 1=01--n ra rol M E"LE4wP"T ou CONS)TR. F1 �JOI-j ARCHITEXTPOUF. 87 EID FIOR CS-j- SZE RATE P MEER M I ELE:aE.iivypa MIS 11; plt,q?Mn an3 Pd St c!l 0 U I A ka , Of 3 W, n 2. Thj Rf"c"o-Wors'a of airl of ani Old v ati jga H � ALL INJO P" "q Ir hr=es-vo d Ey 03 IN7A �,�o mmmowm-.a XI-4 .1 Apr 40- -, Air f UFO^, ^Olt r -or- .... ...... v v rqcw- so fto"mm- 777 05 M* A 4LO F'l PLt 0' I. 0 41 Tqr- c;r Ov Ll �41 { „ M .r•.��y� d 8� ,.�. t�ttd,i, .. :.�,�.,y.rtio rx„ ,:..o.tx�n .K ur. v.� mmrr � t �> y d{ ^9 "+ss'�. y l �irir. r.w'arx-: .:.. MK�ktYh�•!+!: ,gr,n�yypnv °w :,. .. Vr ••�� bbtu` 3ti.n'. q.y�,� Y �g f a .rr..cv...roa•mwnwx.n.a.n+.nJb w.wrv�.vnwaeMv4 .vai.: fi .�`�ri ...b».•.w+n':vx�Marvxraanxiwr f=,tt-jt EXrEREor "' r '$Vfirw N"-b.:mwe+�rz++er...vueuawa�.r.+farxN*,+�MrvMnY+ts�. I isva— ' W�:F+MW.weM1'"'atrY' vr/.w�,9t.WitiMi(w>u.Fi:GivittlL:vyyAi�,le,.N�tt�VMdJh.Stl.uk'k Y�ti�' 4kY.sdTkSYrk�.D`.vsrau:t+.oltli � fwvo.wt.aiRZ;:4Y� •, g ...} u�, 4fi . JYA NOT-C14 tp ,T- eru�. �/� ACtk 7YeM. WE CBC TABLE 23-11 -B-1 -NAILING SCHEDULE CONNECTION NAILING' 1. Joist to sill or girder, toenail 3-8d 2. Bridging to Joist, toenail each end 2-8d 3. 1" x 6* subfloor or less to each Joist, face nail 2-8d 4. . Wider than V x 6" subfloor to each Joist, face nail 3-8d 5. 2" subfloor ;t or girder, blind and face nail —Sole 2-16d 6- plate to Joist or blocking typical face nail Sole plate to Joist or blocking: at braced wall panels 16d at 16" o.c. 7. Top plate to stud, --end nail 3-16d per 16" 8. Stud 4osole plate - 2-16d 4-8d, toenail or 2-16d, end nail 9. Double studs, face nail 'riall 16d at" o.c. 24 10. Doubled top plates, typical Facie Doubled_ top plates,, lap splice I '. 16d at 16" o.c. 11. Bloc Ing between joists or rafters to top plate, toenail 8-16d 3-8d 12. Rim Joist to to plate, toenail 8d at 6* o.c. 13. Lop pfates, laps and intersections, face. nail 2-16d 14. Continuous header, two pieces 15.2 "lin joists to plate, toenail 16d at 16" o.c. aloe 2 each edoe 16. Continuous header to stud, --toenail 3-8d 17. Ceiling joists, laps over partitions; face- nail - - 4-8d 18. Ceiling Joists to parallel rafters, face nail 3-16d 19. Rafter to —plate, toenail 3-16d 20, 1" brace to each stud and late, face nail 3-8d 2-8d 21. 1" x 8* sheathing or less to each bearing, face nail 2-8d Wider22. than 1" x " sheathfn—g to each biairing, 3-8d 23. Built-up comer studs 24. Built-up W om an s aggert 16d at 24" o.c. 2 1] 1 afe-n-Usand at-ei-aEF -s-pTic-e plan;(i--2--i'BU-at--e-a-cTTBearing - 26. Wood--stru uraI pane li--an-d part c e oar Subfloor, roof and wall sheathing (to framing): 112* and less 19/32* - 3140 7/8" -1" 8d4 or 6ds 1 1/8"- 1 1/4" 8d3 Combination subfloor-underlayment (to framing): 10d 4 or 8ds 3/4" and less 7/8* -1 6ds 1 1/8* 1 1/4" Us 27. PariiI_siding _{to framing): I Od or Us 112" or less 5/8* (16 mm) 6ds 28. Fiberboard sheathingi;f­ 8d" 1/2" No. 11 ga.8 6d4 25132" No. 16 ga.9 No. 11 g0 8d4 29. Interior paneling No. 16 ga.9 3/8" 4d10 6d" Common or box nails may be used except where otherwise stated. Nails spaced at 6 Inches on center at edges. 12 Inches at Intermediate -supports except 6 inches at all supports where For nailing of.wood structural,pone, and particleboard diaphragms and shear walls, spans are 48 Inches or more. refer to Section 2314.3. Nails for wall sheathing Ing maybe common box or casing. Wormed shank. 4 Common. Deformed shank. tJ Corrosion -resistant a t siding or casing nails conforming to the reaulrements of -.11nn 17-*17r% I .......... section OTIM wlawa�r, FtArJ .. ......... ... y , 07.14 v"Acl �T A04 A L'(5, 40 1 t� sA t Nz, "W, ON ow 4,10 t 777 Oct w hrh P 77. r�4 a�«>, . 'ipt. 44" Wrrt4 Rai&" 5t,0pA#Wwr CIA 51"A W.'" NIS 410A 't v4" . ;_0 w� Moe, 191 I IS! MIAMI eIZ4 . . . . . . . . . . . AA PA Off 17 ro ell m M, 0 RE"'ED PlAR 14 2003 CUY Of Santa Ana Title-24 Compliance AB-970 2001 Residential Standards Project-. Addition to. Existing Residence 13255 Broadway 5anta Ana, CA Energy Code Works, Inc. Certificate of Compliance: Residential (Part I of 2) _ CF-1 R EXIST. + ADDITION AREA FOR COMPARISON 10/1/02 Project Titre Date 13255 BROADWAY SANTA ANA Project Address Building Permit # ENERGY CODE WORKS 1-800-700-0131 Plan Check I Date Documentation Author Telephone Computer Performance 8 Field Check I Date Compliance Method (Package or Come= Climate Zone Enforcement Age= Use Only GENERAL INFORMATION Total Conditioned Floor Area: 1,533 f? Average Ceiling Height 9.0 ft Total Conditioned Slab Area: 0 f? Building Type: (check one or more) Single Family Detached 0 Addition Single Family Attached 0 Existing Building ❑ Multi -Family FK1 Existing Plus Addition Front Orientation: (Southwest) 225 deg. Floor Construction Type: E]Slab Floor Number of Dwelling Units: Number of Stories: Raised Floor BUILDING SHELL INSULATION Const. Component Type Frame Assembly U V lue Location/Comments (attic, garage, typical, etc.), , _ , R-13Wall (W.13.2x4.16) woo 0.082 BderiorW4 R-19 Roof (R.19.2x8.16) Wood 0.050 Exterior Roof R-0 Floor (F.O.W.Ig Wood 0.101 Exterior Flo" I Over Dawisgace (WR-43 Craft) R-19 Floor(F.19.2x8.16) Wood 0.038 Exterior Floor i Over Crawlspace W—R--6 Credit) EXIST. ROOF Wood 02199 Exterior Roof EXIST. WALL Wood 0.386 Exterior Wag FENESTRATION Shading Devices (Type Orientation Area Fenestration Exterior Overhang Side Fins (SF) LL-Fa= SHGC Shading Yes I No Yes I No ko 16.0 017 010 pm screw.— El Rx F-1 f❑'xj I Repr ?Northeast) 40.0 0.55 0.65 1,:km Sc reen Q ExI 1:1 EXI 1 Ld 01�9 oun s=PA— El FRI 0 Yx ---LNQftw,p*— Front Lsmftnm 54.0 128 0.80 m screen El Ex] 11 1xi 1 Left 22.0 128 0-80 Bus Sp El Ox 0 EX7J 1 Right (qMillmg) 46D 1.28 0.80 Bua SS2e3p0 lil Q ❑F-1 ❑ El 0 1:1 0 1 0 1:1 ILI El 0 D El 0 un Initiation Time. I102 M 13: 11—A-- 4A-1'2AM-Xu ..R Fs� User Number. 1562 Job Number. C nq�2=A 0_1 21---, TITLE 24 REPORT Title 24 Report for: EXIST. + ADDITION AREA FOR COMPARISON 13255 BROADWAY SANTA ANA, CA Project signer: r0i LOUIS QUIROGA 13255 SOUTH BROADWAY SANTA ANA, CA (714) 720-4362 Report Prepared By: MARK D.MADISON ENERGY CODE WORK,3 2600 Michelson Dr., Suite 1700 Irvine, CA 92612 1-800-700-0131 Job Number: C2002022A Date: 10/1/02 The Energyflro computer program has been used to perform the calculations sunwronzed in this complianae- report. This program has approval and is authorized by the Caltibmia Energy Commission for use with both the Residential and Nonresdential 2001 BOMing EneW Efficiency Standards. EMWPro 3.1 By EnergySoft Job Number C2002022A User Number 1662 Compliance Summary Project. - Addition to Existing Residence 13255 Broadway Santa Ana, CA Building She New walls: R-13 Batt insulation New roof/ceiling: R-19 Batt insulation New raised floor: R-19 Batt insulation New Windows: Dual pane/metal framed/no tint New French doors: Dual pane/non-metal framed/no tint Thermal Mass NONE REQUIRED HVAC EXISTING TO REMAIN Water Heater EXISTING TO REMAIN WHAT YOU NEED TO DO8 Place I certificate of compliance (CF-IR) and mandatory measures checklist (W-111) ,tickybak or Aif files on your original drawings then run your blueprints for submittal. next sign blueprints on signature sheet. Submit 2 copies of the calculations and keep one Far your records. If you have any questions please call 1-800-700-0131. Certificate of Compliance: Residential Part 2 of 2) CF-1 R EXIST. + ADDITION AREA FOR COMPARISON 10/1/02 Project Title Date HVAC SYSTEMS Note: Input Hydrordc or Combined Hydronic- data under Water Heating systems, except Design Heating Load. Distribution Heatin enl Minimum T e and (Z Eq u at Location Duct or furnace, Efficiency P* in Thermostat Location Type . ce e n Value Type Comments pump, etc) (AFUE/HSPF) (ducts, attic, etc.) R Ctnttaj 72.16 AFUE puct.-, in Affic 2-1 Safthack — EXIST HMAG Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location I heat pump, evap. cooling) (SEER) (aft, etc.) R-Value Type Comments Split Air Conditioner -AO-SF-ER— Ducts in Attic 21 Seled Fxlgr HVAG WATER HEATING SYSTEMS Rated Tank E Fact. External Water Heater Water Heater Distribution # in Input Gap. oPR%very (Standby Tank Insul. System Name Type Type Syst LossBtu/hr (gal) Efficiency 0) R-Value FXISI -Smal[JGA-6— Shwdad---- I SA non 40 053 rda 12 I For small gas storage (rated in" of km than or equal to 75,000 Stuthr), electric resistance and heat pump water heaters, 1W energy factor. For large gas storage water heaters (rated input of greater than 75,000 MAO. W Rated Ir" Recovery Eftlency and standby Loss. For instantaneous gas water heaters. rant Rated Input and Recovery Effbency. REMARKS COMPLIANCE STATEMENT This mWicate of coml*M fists the boft %OW= and performance Veacaam needed to comply wkh Tffie 24 Parts I and 6 of the California Code of Regulators, and the admin straWe regulabors to implement ftm. This certifixale has been "ned by the individtial with overall design responsbW The undemVned recognoe that compliance uwV duct seaft and TXVs requires installer IeVm, and ceriffication and field verilication by an approved HMS rater. Designer or Owner Cm susiness & Professions code) 6 te. Documentation Author Name: Name: KtA TitlelFirm: LOUIS QUIROGA Title/Firm: ENERGY CODE RK Address: 13255 SOUTH sRoADwAy Address, 2M Vkhelson Dr. Suite 7&1`1' SANTA ANA. CA Irvine, CA 92612 T Iele h Telephone:) 71 -800-oo.-o31 90e-VM72!�4362 "A Lic. 1� (SigWtur(;)-- ftlatelf (Skinature) Enforcement Agency Name: Title/Firm: Address: Telephone: 3.1 8V Eroe=Soft User Number. 1562 Job Number C2002022A - Page.4 of 21 I,-` Certificate of Compliance: Residential (Addendum) CF-1 R EXIST. + ADDITION AREA FOR COMPARISON -10/1tQ2---- Project ritie Data Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the Rem specified in Oft checklist These itents require special written justification and documentation, and special verification to be used with the performance approach. The local eqf6rrement 2nonew dete"n!tV9 ttM ndantnfth-v of flin fitc4ifin2finn L based on the adequacy of the special Justification and documentation submitted. Plan _Ekq!!J r- i ITIm DhW System"EK13T. WATER BEATER"ftetyy ftdut z 0.530. Ali EF below 0.30 w4ukft an R-12 Exteml Blanket .0 HERS Required Verification These features mud be confirmed andfor tested by a cerfified HEM rater under the supervision of a CEC approved HERS .11WIFFA7CS. vim 1`11ZINO Ila"" arm o5a9"05uv;1%i5UFIg 0Tu;ie5eMUa*Ur%M WI a Yount ter-om Bun Initilgon TiMe: 101DII02 13:09:41, Run gode. 1133_602986 User Number IW Job NUMW. =2022A I ErvergyPro 3.1 8�1 EnergyySoft Page:5 of 21 Mandatory Measures Checklist: Residential (Page 1 of 2) MF-IR NOTE: Lownse residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. Mien this checklist is irmrporated into the permit documents. the features noted shall be considered by all parties as mounum component performance specifications for the mandatory measures whether then are shown elsewhere in the documents or on this checklist only. DESCRIPTION ImWuctions: Check or initial applicable boxes or enter NIA if not applicable. DESIGNIER ENFORCEMENT Building Envelope Measures OxO -§150(a): Minimum il-19omiftVinsulatim. §150(b): Loose fWinsulation manufacturer's labeWR-VaWe. =finim R-M13 wa=fttion to wood framed waft or equivalent U-value in metal frame was (doesto t va= M X*§lWd): Minimum R-13raised floor insulation inframed floors orequwatent §150(g: Slab edge insulation -water absorption rate no greater than 0.30/6, water vapor transmission rate no greater than 2.0 permfticti. §118: tnsulationspecified orinstated meets insulation quality standards. Indicate type ant form. §116-17: Fenestration Products, Exterior Doors and Ind controls 1. Doors and windows behvean cDrKWaW and unoonditioneid spaces designed to ftft air leakage. 2. Fenestration products (except field fabricated) have label with certified U-Factor, certified Solar Heat Gain Coallicient (SHGC). and infiltration certification. 3. Exterior doors and windows weathetstripped; all Joints and penetrations caulked and sealed, ❑ 916ft): Vapor barriers mandatory in Clitnate Zones 14 and 16 only. §150(Q.- Special inift-ation barrier installed to carriplywith Section 151 meets Commission quality standards. §lWe): Installation of Fimpboes, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: a. closeable metal or glass door b. Outside * intake with damper and control a Flue damper and control 2. No continuous burning gas pilots allowed. Space Conditioning, Water Heating and Plumbing System Measures ,X 6110-IT WAC equipment, water heaters, showerheads and faucets certified by the commission. 615M)-14.ft.Wcoding bads uttered i.=oW.-,,.eviMASHRAE,SMACNAorACCA, 915"). Frqw and Tank insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 mist be externally wrapped with insulation having an installed thermal resistance of R-12 or greater. 2. First 5 feet of pipes closest to water heater tank, iron recirctulating systems, km*ftd (R-4 or greater) 3. Back-up tanks for solar system, unfired storage tanks, or other Indirect hot water tanks have R-12 extemal insulation or R-16 combined interivallextemal insulation. 4. AN buried or exposed piping insulated in m&wtating sections of hot water system. S. Coor" system piping below 55 degrees F. insulated. 6- Piping insulating between heating source and indirect hot water tank. ;FstergyFro 3.1 BY EnOWSOft User Number 1562 Job Number. C2002022A Page:6 of 21 MandalM. Measures Checklist: Residential (Page 2 of 2) MF-IR NOTE: Lowrise msww*w hadings subject to the standards must contain these measures regardless of the compimtoe approach used. items marked with an asterisk (*) may be superseded by rrom stringent oxvipliIince requirements. listed on the Certificate of compliance. Men Oft checklist is incorporated into Me Permit (10MUM1113, the features noted stiall be consklared by at parties as nurvinuirn componeift performance speercations for the mandator measures whathel' they are shown alsewhere in the docunumft ar m *,k r4%,v*jk* -aw IDESCRIPTION Intuctions: Check or laftlat applicable boxes or enter WA if not applicable. DESMER ENFORCEMENT Space Conditioning. Water Heating and PtumbM System Measures {continued)rs- -SlWMY Ducts mid Fans; 1. AN ducts and plenum inslailw, sealed and Insulated to nit the requirements of the iggs cmc Sections 6ol, 603. 604 and Standard 6-3; ducts insulated to a Avinimurn installed level of R-4.2 or enclosed entirely in condiltionedspace Opeahrigsshall be sealed with mastic, tape, aerosol sealant crother dud -closure system that meets tie aPPOcablemWkeffmt-,OfULISI.ULI$lA.orULISiS. ff mastic or tape is used to seat openings greater than 1A inch, the owtvirtation of mastic and efflW mesh of tape shall be used. Buff*v cavwm shall not be mod for conveying wnditioned air Joints and seams of duct systems and thek cornporients shall not be sealed with cloth back ribber adhesive duct Was unless such tape is used in coriviviriation with mastic and drawbands. 2 SEW"cavities. Support 1114111imm for air handlers, arid Plenumit defined or constructed with materials other than sealed sheet matal, duct board or flexible duct " not be used for conveying conditioned air Building cavities and support pWftm My contain ducts. Ducts matalled in cavities and support 0aftIms shall not be compressed to cause reductions in the ayss-saCtiortal am of the duft 3. Joffft and seam; of duct systems and the compmervis SW M be sealed with cloth back rubber adhesive duct tapes unless such a We Is used ki combination with mastic and diawbands. 4. Exhattst fan systems have back draft or automatic dampers. 5. G-* ventilation systems sal" cmxUned space have eillwaulonuft or readily accessible manually operated damperis. 6. Protection of trisi*16on. hisulation shall be protected from dw-AM including that due to wn%K moisture, M*Ment matritervarice, and wind but not linvitavf to do MmV4 insulation exposed to weather shall be suitable to outdoor samice 04- PVWW by alUMMUM, Shad ffletK painted canvas. of piestiv: cow cellular foam insulation " be protected as abaft or painted with a coaft that is water retardant and prIvOklas shielding from sdW radiation that can cww degradation of the malKW. §114: Pool ..dSpa Heating systems sdEquipment 1. Certified with 78% theffnal efficiency, on -off switch, wealtiarprod operating insir� no electric resistance heaft, and no pilot. 2. System is instZile(I with at least W Of Pipe between War and heater for future soW, cover for outdoor pools or Spas - a. At least 36"of pipe between fiter "heater for future solar heating. b. Cover for outdoor pods or outdoor spas 3. Pod system has directional inlets and a circulation pump time SwftK kfXx:-�] ills- Gas flit! central Nine.-, pool hers.. spa heaters or dhot>settakt codatg have. COntim-SlY burning P&A W (Exceptiort Non-dectrical cooking appliances with pilot < I So shor) ills ft. Coot Roof material meet specified crfterW Lighting Measures §150(k)l: L-nif-ireS for general lighting in kitchens -W have W-0- with an efficacy 40 lumenwWattor greater for gervenif W" vri kllchafm Thus general Fighting shall be controlled by a switch on a madly accessible lighting omt'd panel at an entrance to the kitchen. §160(k)2: Room with a shower or bathtub must have either at least one lumirvaire with lampi; with an of of 40 of greater switched at the entrance to ft room of one of the afternalive to this requirement allowed In Section 150(k)Z; mW recessel ceiling tivduma, are IC (•rMlation cover) approved. r--- i 3.1 By EnergySoft User Number 1562 Job Number C2002022A Page:7 of 21 Computer Method Summant (Part I of 31 C-2R. ComRuter Method Summary --- (Part 2 of 3) C-211 Computer Method Summary (Part 3 of 3) C-211 EXIST ± AnnITI AREA EOR COMPARISON I OZI tQ2 EXIST. +, ADDITION AREAT-QR-COMPARISON 10/1/02 EXIST. + ADDITION AREA FOR COMPARISON 10/1/02 Project Me Date ProOT ie- ------- - Date Proed TWO Date 932rifi RROADWAY SANIA ANA ProjectAddress Building Permit At FENESTRATION SURFACES U- Act. Glazing Type Location/ THERMAL MASS FOR HIGH MASS DESIGN FNFRGY V.Or)F WORKS 1-800-700-0131 Plan Chet;k0ate Type Area Factor SHGG Azm. Tift Comments Area Thick. Heat Inside Type (so (in.) Cap. Cond. Form 3 Reference R-Val. Location Comments Docurrientallort Author Telephone I WrAw Roar AwAheast) is n nam n m 45 (In Double MeW K-Apar AREA Comm der Performanep- Cote ice Method a= or Court amc� 8 Field CheckMate Climate zone 2 Window Rear It!q~ 40.0 0,550 0.65 3 Wmdcm Left ftdbmNst) 16.0 M870 0,M Ddault EXIST + AMf r 45 90 Double NonW Clear pgfim* EMST. + AMFT. AREA 319i 90 Double clear Source E Use Standard Proposed Compliance 4 Whylow Frord LRM&mLest) 54.0 1,280 0.0 -0 Metal DeftA EXIST, + ADD1T, AREA 225 90 Si%Ll Metal gog Defaug EXIST. + AUDIT. AREA (=,giergy yr) Design Design Margin Existing+Addition Budget Adjustment 5 Wndow Left ffiQowest) 210 1,2ffl ---- 0,& 3­15 90 single Metal _QWK Dafa�� EXIST. + AWAT, AREA Space Heating 6.36 27.65 -21.29 Ratio F: 11491 ISM = 0.760 -6- Windm high (-,QW)w%) 46.0 1280 GAD 135 le Metal Clear De&1WL_ MST, t BQGIT, AREA Space Cooling 8.10 70.10 -62.01 Budget Adj., 0.750 X (171.65- 35.07) = 102-37 - - - PERIMETER LOSSES F2 Insulation Domestic Hot Water 15.53 15.37 102.37 + 29.99 = 132-36 113.12 0.16 The budget shown to the M has been increased using this &*J0 =% b,==E=bWdft 19.23 in Type Length Factor R-VaL Depth Location Comments Totals he C-2 his form. Percent better than Standard: 14.5% BUIL12ING COMP1.0i Total Conditioned Floor Area: 1,533 ft2 Floor Construction Type: 7 Raised Floor 0 Slab Floor Building Type: Single Fam Detached Building Front Orientation: (Southwest) 225 deg Total Fenestration Area: 12.7% HVAC SYSTEMS Number of Dwelling Units: 1.00 Total Conditioned Volume: 13,797 ft3 Heating Equipment Minimum Distribution Type Number of Stories: 1 Total Conditioned Slab Area: 0 ft 2 Type (furnace, heat Effimimv and Location Duct Thermostat Location/ pump, etc.) (AFU S FXducts/aft, etc.) R-Value Type Comments BUILDING ZONE INFORMATION # Of Thermostat Vent C&Xftl :unwtca 72YAAEUF- Ducts in A 2-1 seft3ack EXIST. HVAC Zone Name Floor Area Volume Units Zone Type Type Hgt. Area EXIST HVAC 1 :13 100 Condifimed Setback n1a - Hydronic Piping Pipe Pipe Insul. OPAQUE SURFACES Solar Act. Gains INTERIOR AND EXTERIOR SHADING Window Overhang Left Fin Right Fin SystemName Length Diameter Thick. Type Area u-Fac. Azrn. -rdt Y/N Fonn 3 Reference Location / Comments # Extenor Shade irpq SHGC Hgt- Wd. HgL LE-4 REA Dist Len. mt. Len. ttgt 1 Bus Screen 0-76 wall 196 Q-M7 45 R-13MB f1N 13 1115 2YA M EXIST + Am- IT ARFA 2 Buci Sam 0.76 _ _ Cooling Equipment Minimum Duct Wan 12A D nv_ An R-11 Wall (W 13 Wan 0087 2,4 l8i FXIST + Annil ARU T go Screen 0.76 _ _ Type (air conditioner, Efficiency Location Duct Thermostat Location 99 135 90 R-I-Awaff VN119Y416) Roof 384 OM a 0 19 2Y8 EXIST * Amll ARIZ-A IS AMIT_AREA--- 4 Bug SMO 0.76 _ _ heat p, evap. (SEER) (attic, etc,) R-Value Type Comments od (R- Boorcs, 1,149 0101 n ISO X M Flom (E.0 2x6 Hkorm 384 n 038 t) an EXIqT ± 16) E)QSJ + AD111T AREA VA 161 EXIST +AD AREA 0.76 0,76 SpU Air conditioner fl&SEER Duds in Alfic 2.1 Setback FXIST- F1VAC Rod 1,149 (1299 r) --(L MST RODE wall M 03M 725 EXMT-WALI wall 60 n3m AS 90 EXIST MAI I M FXIST +AIT ARPA FXISI AUDIT ARFA Wail 214 Q-W 31 S 90 EST WAI I Wall 274 1713M 115 90 EXLqT WALt- EXIST -*-AUDIT AREA EXIST 4- A 11 ARPA EXIST + A rr ARFA WATER HEATING SYSTEMS Rated' Tank Energy Fact? 1 TankInsul. Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R-Value System Name Type Type qjfg- (ftft (gal) Eftiency I= (!/o) Ext. EXIST. WATER HEATER_ anWLGaS__ standard 1 50000 40 053 For small gas storage (rated input - 75000 Bttft). electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 751xt0 BW, fist Rated Input Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated input, and Recovery Efficiency. REMARKS I Run Initiation Time: 10101102 13:09.46 Run Code: 1033602986 EnergyPro 3.1 By EnemySoft User Number: 15W Job Number. C2002022A Page :8 of 21 R EnergyPro 3.1 By EnevgySoft User Number. 1562 job Number. C20=22A Page Run In _tdgfio rime: IQ[01102 -13:09.48 Run Code: 1033MM EnemyPro 3.1 L3,1 EnewSoft User Number. 1662 Job Number C2002022A Page.,100f2l Computer,Method SummaAddendum) - C-2R EXIST + ADDITION AREA FOR COMPARISON Date 101-02- Prolect TWO Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items s1pecilliliad in this checklist. Thew delift require special written Justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the Justification, and may reject a building or design that otherwise cmPlIes based on the adequacy of the special Justification and documentation submitted. Ffeid [The DHW Svstem=. "EXtST. WATER HEATER" FwAU1 � 0.An Er below 0.58 mqurw an R 12 Ext0ml Slarkilid- HERS Required Verification I 111luttm lilwattAINM 15.w . . ....... - --- - -- - - -- provider. The HERS rater must document the verification and a-rtd-diagnol fe"ng lit these measures on i form CF-6R. Plan Field if Ltuntnitl[ime: 101011021 :09:46_--C 33502-98-6 1EnergyPro_3.1ByEnergySoll User Number. 1562 Job Number. C2002022A Paw- 11 of 21 Computer Method Summant (Part 3 of 3) C-2R EXISTING SCORE FOR COMPARISON 10/1/02--- Project Title . Date THERMAL MASS FOR HIGH MASS DESIGN Area Thick Heat Inside Location Type (sf) (in.) Cap. Cond. Form 3 Reference R-Val. Comments . ... ... PERIMETER LOSSES F2 Insulation Type Length Factor R-Val- Depth Location Comments HVAC SYSTEMS Heating Equipment Minimum Distribution Type Type (furnace, heat Efficient and Location Duct Thermostat Location/ pump, etc.) (AFUE/HSPF)(ducts/stIl etc.) R-Value Type Comments Central Furnace 7016 AFUS Ducts in Attic Se aim EXIST HVAC Hydronic Piping Pipe Pipe Insul. §IqeT Name_ Length Diameter Thick. Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location heat pump, evap. Cooling) (SEER) (attic, etc,) R-Value Type Comments Sig Air Caridgioner 8-0 SEER Ducts in Attic 2-1 Setback.. FXISI. HVAG WATER HEATING SYSTEMS Rated' Tank Energy Fact! 1 Tani Water Heater Water Heater Distribution #in Input Cap. or Recovery Standby R-Value System Name Type Type Syst. (Btu/hr) (g@0 Efficiency Loss (%) Ext. EXIST. WATER HEATER___- SmaLGas__ standard 1 50000 40 040 ---nla-- For seal gas -storage (rated input <- 750f)0Muthr), electric resistance and heat pump water heaters, W energy factor. For Large gas storage water heaters (rated input > 75000 ftghr), fist Rated Input Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, fist Rated Input, and Recovery Efficiency. Run. jnttiation Time: 10101102 13:09-.46 Run Code: 1033602986 i gLieWPro 3.1 By EqemSoft User Number. 1562 Job Number. C2002022E P27,q;e-.14 of 21 .nn (part I of 3) CAll ComRgter Method Summgy (Part 2 of 3) C-2R uter Method SummaFY -Comg) 1� ill"", 111[`� 11D2 I '', 1 EXISTING SCORE FOR COMPARISON 10/1102 :31MRIE IFOR-COMPARISON - Date Project Tft Date Project Title ANA�tulidingrwlt # FENESTRATION SURFACES U- Act. Glazing Type Location/ Project Address 0-700-0131 # Type Am Factor SHGC Azm. Tilt ENERGY rDDE-t0RKS- Documentation Author eem Plan Chate Field C 1 Vaindow Front tsouttalflest) 540 12M 0 an "S 0XI Sinii al Ckar Deftult z- window E�p-r (MQM94-st) 61Q 1.280 0.80 45 Sinale metal Clear Default EXIST El 00R AREA EXIST. FLOOR AREA 22MR-Mmml (E22M Ol M 1pi- I proposed ..Dat9 Climate Zone3 Com, pliance Window Ud INQ11i ---= -12K U0 315 go bia Mew Clear DpftWL- I window wit 46.0 1.280 0.80 135 90 S ft!@ Metal Clear Default EXISI, AREA EXIST. FLOOR AREA Standard source Enetgy use Design Margin.. Space Heating 6.91 51.83 9.07 93.53 -44.93 -84.46 Space Cooling 19.10 26.29...- -7-19 Domestic Hot Water 35.07 171.65 -136.58 Totals Percent better than Standard: i Fu Exi + n rns F -- - -2 Total Conditioned Floor Area: 1,149 ft Floor construction Type: 7X RaisedFtoor F-1 Slab Floor Building Type: Single Fam Detached Building Front Orientill n: (Southwest) 225 deg Total Fenestration Area: 15.8% 3 10,341 ft Number of Dwelling Units: 1.00 Total Conditioned Volume, 0 ft 2 Number of Stories: Total Conditioned Slab Area: BUILDING ZONE INFORMATION # Of Thermostat VentZone Type Hgt. Area Zone Name Floor Area Volume Units EXIST HVAC. Conditioned Setba n1a Solar INTERIOR AND EXTERIOR SHADING Window Overhang Left Fin Rilht Fin OPAQUE SURFACES Act. Gains Y/N Form 3 Reference Location Comments # - E)derior Shade Tyne SHGC HM. VW. Len. Hgt- I-Ext WA- ba Len. Ryt. Dist. Len. Hgt. Type Area Azm. Tilt I Bug Screw - 0.76 -U-Fac. Floor 1­142 n 753 ... 1811, n 213A 0 n FXIST ROCIF BaST-OXORAREA-- Cr 2 MSc - 076 3 Bug Screen 0.76 Rod I J49 -W,A- 226 22 9a F:XIST WA I 1 wan n nM 45 90 FXIST- WALL - EXIST EXIST F1 OOR AREA 4 Bug I $cre Wan a- 315 Qft 335, gn MST WALI FX=..El OCR AREA 1H 101lWA6 Run Col 1033SO2M Run initiation Tiae. 1010110213-09:46 Run Code: 1033602986 page-12 of 21 ------ -111"itialiwTime. By Er-WySoft User Number. 1562 Job Number. C2002022E Page ,13 of 21 *" PROPOSED CONSTRUCTION ASSEMBLY ENV - I DATE PROJECT NAME EXIST. + ADDITION AREA FOR COMPARISON I ­ 10/1/02 W W 0 SKETCH OF ASSEMBLY ASSEMBLY NAME R-13WAII (W.13-2XII-161 ASSEMBLY Floor TYPE (check one) Xwan Cefling I Roof FRAMING MATERIAL Wood FRAMING % 15 Io Framil % 16% (16"o.c. Wai III 12% (24" o.c. Wall) 10% (111 ol 1:10ol 7% (W oc. Flool il l ICON -&U_CTioiCOMPONENT S DESCRIPTION FRAMING oursm SURFACE AIR FILM F 1 -sw= ❑ 2 Membrane, ya - - -Pwneiable Feit­. 3 Insulation, Mineral Fiber, R-13 4 Gypsum or Plaster Board F-1 i 5 i El 6 ❑ 7 8 INSIDE SURFACE AIR FILM *NOTE:: We!ght Specific Heat values for materials pei -1 I R-VALUE 'HEAT CAPACITY (Optional) THICK- NESS (kL)(Rc)R-VALUE CAVITY I R-VALUE WOOD FRAME WALL WEIGHT (ftill SPECIFIC HEAT (SWIF-lb) i HC I (A X B) MtuIF4q '�u r 0.87 0.170 0.1701 0.175 0.1751 8.46 0*20 1-691 0.060 0.060 0.06 0.35 0.0z, 3.500 0.500 - 12.999 0.450 3.465 0.450 1.18 2.08 0.36 0.26 0.421 1 0.5411 SUSTOTA Wwood 0,6801 0.680 TOTAL HC members. F 71 2. 14.531 5.00 Rc ftMklg include KT the effects of the from r ------------ x + [1: :0:2 0 ��OO x F 0.10 1 0.082.....-] 0.0688 0.90 U -- E I 1Rc I - (Fr% 1100) 11 Rf Fr% 1100 ASSEMBLY U-VALUE 1COM.MENTS Job Number: C2002=A Page: of �21 1PROPOSED CONSTRUCTION ASSEMBLY ENV-31 1PROJECT NAME DATE i I EXIST. + ADDITION AREA FOR COMPARISON 10/1/02 ASSEMBLY NAME IR-19 Roof (R.19.2x8.1M ASSEMBLY Flo" TYPE Wall (check one) Ceiling I Roof 0 FRAMING MATERIAL 0 FRAMING % 10/0 ETill % is% (IV O.C. Wan) 12% (W o.c. Wall) 10% (16" oc. Floorill SKETCH OF ASSEMBLY 7% (24" ol FloodClaIL) 11CONSTRUCTION COMPONENT-6 V R-VALUE *HEAT CAPACITY (Optionall) THICK- CAVITY WOOD WALL SPECIFIC HC FRAME MESS R-VALUE F WEIGHT HEAT (A X M DESCRIPTION FRAMING (in.) (Re) R-VALUE (nWsq (Stuill (Bbj/F-sO lou,rsim SURFACE AIR FILM - 0.170 0.170, - - - 1 0.250 0.440 0.440 1.46 0.30 0.441 2 1 Membrane, Vapor-Penreable Felt 1 ❑ 0.010 0.060 0.060 0.06 1.42 0.35 0.02 0.29 0.41 3 JPlywood (space Spam 0 F9. 0.500 0.620 0.620 1.250 0.750 1.237 0.29 0.39 0.111 5 ItmulationWwalFiber, R-19 N 6.00019.002 5.940 1.67 0.35 0.59, t 6 JGypsum or Plaster Board ❑ 0.500 0.450 0.450 2.08 0.26 0.54 7 8 9 ❑ iINSIDE SURFACE MR FILM 0.610 SUBTOTAq 22.10 9.53 Re 7.0 TOTAL HC *NOTEWeight and Specific Heat values for materials pernetrated by wood framing include the effects of the framing members. x 1 0.92 + x .08 E =6 I/Rc I - (Fr% 1100) Fr% 1100 ASSEMBLY U-VALUE ICOMENIS EriergyPro 3.1 By Ene�rSoft User Number. I562 Job Number C200202M Paw16o(21 vim