HomeMy WebLinkAbout2311WCapeCod(Bldg.B-19).pdfLOCATION 2311 W. Cape Cod Way Bldg 19-B ZMl FZ3
Lot 4
USE Industrial tilt -up GROUP B-2 TYPE VN
104/
Block 145/12
VA, CUP, R/S 80-877 SQ. FT. RES. 5,936 GAR
Tract
Aandscaping re 'd /im rovements re 'd
Letter on file
PERMIT
DATE
OWNER, CONTR., VAL. AND REMARKS
BLDG.
10946
5-2-80
Industrial Dev., Owner
Contractor $74,080
PLBG,
V33564
4-11-80
B & D Plumbing
HTG.
✓ 20794
8-19-80
Far West A/C
SEWER
.3 4324
8-11-80
ISouthwest Pipeline _
ELECT.v25080
9-M-180
I HG Electric meter
Bldg
✓10760
4-9-80
Foundation only - Industrial Development
$18,520
Elec
,/24627
8-1-80
lhr insp. for Industrial Dev. by H.G.
Electic Inc.
Plbg
v�34826
10-9-80
L/S for Industrial Dev. by Angeles Crest
Landscape
1-27-8) Released electricity - 30 day temp.
Elec.j#23580 4-8-80 1 Constr. Pole serv., 3 dist. poles for
Industrial Dev., owner
4-8-80 Released Constr. Pole Serv. (2318)
Bldg/4441 8/7/81 Interior Partition for Chapman Ent by S&D Const
/ $600.00
P1')g !;37127 9-4-31 1 fixture (laundry tray), 1 a/S, 1 1.vater piping
for Industrial Dev. by Tile Plbg Co., Inc.
Htg;,12146 9/10/81 1 suspended heater, 1 htg appl repair or alt for
Chapman Engrg by S&D Construction
Misc Receipt 04916 9/23/81 Elec P/C 2168($44pd)$108.00 pd by Robert
N. Dicken Company, Inc.
Bus. Lic,..10-5-81 Machine - Chapman Engineering (B2 VN)
10-5-81 Released electricity - final, 30 day temp. off
10-5-81 Released final gas
Eleck,6830 10/5/81 20 outlets,2 fixtures, 26 motors for Ernie Chap-
man by Robert N. Dickey Company, Incorporated
Plbg Y12620 9-15-87 ind waste interceptor
Address 2311 W. Cape Cod Way (card 2) Unit#
e e
ice. _