Loading...
HomeMy WebLinkAbout2311WCapeCod(Bldg.B-19).pdfLOCATION 2311 W. Cape Cod Way Bldg 19-B ZMl FZ3 Lot 4 USE Industrial tilt -up GROUP B-2 TYPE VN 104/ Block 145/12 VA, CUP, R/S 80-877 SQ. FT. RES. 5,936 GAR Tract Aandscaping re 'd /im rovements re 'd Letter on file PERMIT DATE OWNER, CONTR., VAL. AND REMARKS BLDG. 10946 5-2-80 Industrial Dev., Owner Contractor $74,080 PLBG, V33564 4-11-80 B & D Plumbing HTG. ✓ 20794 8-19-80 Far West A/C SEWER .3 4324 8-11-80 ISouthwest Pipeline _ ELECT.v25080 9-M-180 I HG Electric meter Bldg ✓10760 4-9-80 Foundation only - Industrial Development $18,520 Elec ,/24627 8-1-80 lhr insp. for Industrial Dev. by H.G. Electic Inc. Plbg v�34826 10-9-80 L/S for Industrial Dev. by Angeles Crest Landscape 1-27-8) Released electricity - 30 day temp. Elec.j#23580 4-8-80 1 Constr. Pole serv., 3 dist. poles for Industrial Dev., owner 4-8-80 Released Constr. Pole Serv. (2318) Bldg/4441 8/7/81 Interior Partition for Chapman Ent by S&D Const / $600.00 P1')g !;37127 9-4-31 1 fixture (laundry tray), 1 a/S, 1 1.vater piping for Industrial Dev. by Tile Plbg Co., Inc. Htg;,12146 9/10/81 1 suspended heater, 1 htg appl repair or alt for Chapman Engrg by S&D Construction Misc Receipt 04916 9/23/81 Elec P/C 2168($44pd)$108.00 pd by Robert N. Dicken Company, Inc. Bus. Lic,..10-5-81 Machine - Chapman Engineering (B2 VN) 10-5-81 Released electricity - final, 30 day temp. off 10-5-81 Released final gas Eleck,6830 10/5/81 20 outlets,2 fixtures, 26 motors for Ernie Chap- man by Robert N. Dickey Company, Incorporated Plbg Y12620 9-15-87 ind waste interceptor Address 2311 W. Cape Cod Way (card 2) Unit# e e ice. _