HomeMy WebLinkAbout300&310NClara.pdfNorth J ` -
LOCATION 300 & 310 r•1 aa Sty -opt Rj
-At'SE Industrial GROUP B-2 TYPE
VA, CUP, /S PM 1047 SQ. FT. 62828 GAR
Landscaping &'improvements required
Lot 14
VN Block
Tract
PERMIT
DATE
OWNER, CONTR., VAL. AND HtMAKKs
BLDG.
4714
6-27-78
Industrial Development Co j
Owner-Contr 75 108.
PLBG.
29951
9432
12-18-78
9-21-79
B&D Plumbing (1 meter
Gene's Htg & A/C
HTG.
SEWER
t.,31216
6-5-79
- -/9
Southwest Pipeline
—�;—Ereech Eiectric k1 meter
ELECT.
Plbg
v12130
Bus. Lic,
9-25-79
9-28-79
2-20-80
2-20-80
L/S for Industrial Dev by Cal-Pac Landscap.
Released electricity as 30 day temp
Cutting paper - HAB Chemical Inc.
(3 B2 VN) f(300) gas & e� �Stdacltemp.)(30)
Released y
Bus. Lic. 2-19-82 Wholesale draft supplies - The Art & Drafting
Supply Co., Inc. (B2 VN)(300)
2-22-82 Released final electricity - 30 day temp. off
2-22-82 Released final gas
Address
300 N. Clara St. unit# --
Activity
F
Permit #
Date
Remarks
Elec
�8335-
==
-
r5--
as - 1 a --G ',,Y--b e ancel
M:r
ancel 5-15-92 #39
Bldg
#33365
1-7-86
hood shaft
--{A)Cancel. 5-7.5-92 #39
oldg
134913
4-29-86
tenant improvement -renewal of #31453
oldg
4912
4-29-86
walk in cooler
Bldg.
60667
3/22/90
add mezzanine (366.5 sq ft
25058
4/2/90
rec. 8, swi 6, fixt 7.
Elec.
Mech.
14302
1 4/5/90
alt htg/clg syst.
Activity
F
Permit #
Date
Remarks
Bus C/o
4-2-
t
-P C
7997
2/19/92
14-4466
Bldg.
71190
3/4/92
Install steel security gate 81,000
Elec.
3354
5/19/92
12-motors
P1mb.
2096
5-27-92
2-wtr pip'g, 3-hose bib
Bus C/O
4-16-92
Alternative Agency - DENIED By PLANNING
M-6416
7-7-92
Revision to E-P/C #7997
Add to EP#3354 - 14-rec, 26-fixt,
2-raceways, 9-ded cir, 2-subpanels &
8-motors
Bus C/0
7-10-92
TOMCHAK ENGINEERING B2 VN Mfg
Mech.
00293
8-24-93
1-cooling tower
Plmb.
00413
8-24-93
1-backflow device