HomeMy WebLinkAbout10146620.pdf1
nor.—M MEMO
m
'
SCHEDULE AREA
-TAL=
a
A7tx110.07E
RF—CCULAK
4
Lam° AREA
7 . (
1 STORY
1•�
�
I
t
N I * `Y
A
1 W W A
�JCONIRK
G•4•�
f^ jj� �( -�^ �rE
�d �e ii AT R i"�t°% 1 FD
`�
2.✓, 2-
ELECTRICAL SYMBOLS
2 X 40 W, FUMOMWAWt
CE&M LIGHT
WALL LIGHT
WALL PACIPTAQ1
GROOM FAULT C#KW Wepy' {1 yam` } p� � E
£
-°r 'lei ACL (vim - .) WATM PROOF
9A m OMA 1
$}
:}
qWTt cm w sNa. POLS
. n
41,
y
d
OMM PAN
WooM
I
I
0 .10
to
3
cc
wnu
to
100
rvl
(4) x g Lot,-tc n
r4b ov-> Ile
=1144
i. �.�1 i�3R ti�I..VMp1{N�1 Wpcl'L � � �' ��% ._......._._... j k
e ��9
410
v
(
A�1�4 vs AL 104
Cl> tv 4r- 61
i�'� 2 41 L00\10k
to4l (-T-f f �
k
11
0
NOTE ON DRAWINGS: 'UNDERGROUND UTILITIES SHALL BE, REQUIREI; FOR THIS PROJECT".
NOTE ON THE PLANS LIGHT & VENTILATION PER CBC SECTION 1202. N, NIMUM OF 15 CFM OF OUTSIDE AIR PER
OCCUPANT IS REQUIRED FOR VENTILATION. 0
NOTE ON THE FLOOR PLAN THE USE AND OCCUPANCY LOAD OF EACH i`1110U AN4YC11'.AREA. RELATE EACH
USE TO A CBC TABLE 10-A ITEM. NOTE OCCUPANT LOADS WHICH ARE GREATER NUMBER
BER BASED SON THE
CB r-' TABLE I O-A OR THE ACTUAL NUMBER OF OCCUPANTS,
i0e
lo?"
iE% x t44 U,4,
gwo��
rO(2 f0�eV Wkt-L,&.
w Ak "P7. 9
s tital�
t'o
0
m
u o T (-r-.( 0)
())VoRMV�a 10+1
1
� y,� Y k -�r zi
}
ID
OD
ell-
w
Tq
C-1IF _Ir_T-�7
.TtzAP W/10, luj
+I., all O/C,.
plXwoor-> V4T� f.
10 ,10 or: ,
1, "3& / I
1
127.
FJ 61, 6 111**"(/
--T
M 6T 3 -7
211, x ��`"� �` ? lM .:c
x
M wcot?
10
I tJ ?SO
JOT,
MIN.
4-4
2,(4 eqor e I
'E-At. CV'K Trycj
LO / 10 Cl Ag ",:, , ( U)
UZI
49-1
e Q,
r
02"x PLA
r
WHEW-,
I
M
ex On ,/I, eox pLywoop eol-14 57 FL
1,6
9 ,
A!MY 4 Q
1111- Ito
rAC70A
12 4 4#1 10,11
45 ..a 16
/A o K i �4 r-,, 2tix j.
_7FLYWCOP
I or,
/7 Z I A C:
%tlkF-KE
I V -VV
r I
14 P W VA 5 VZ.V- 0 6 C, 0 F�
2" 4
MEN
WD
0
+
M"Clop
4
15 , F>AWA't,\PA 12NI---
AW,
tul,
w
5/Y c r) x
'SCHEDULE
GENERAL NOTES: SHEAR TRANSFER SCHEDULE
S H E A R WALL
SEISMIC ZONES 3 & 4 4-17-03 SH15AR SILL PLATE
I Provide smoke detectors in all bedrooms and entrances to bedrooms, See plan for location.
ANCHOR
TRANSFeR NAILING
i 2. See Detail for cord splices and detail t 3�> for shear wall drag struts, NOTE: THE VALUE OF SHEAR PANEL HAVE BEEN REDUCED TO 75% iMPSON SPACING 20d BOLTS
OF THE VALUE OF THE U.S.C. TABLE 25, K-1,
A-35" COMMON SPACING
SYMBOL DESCRIPTION' P.L�F.
3. An approved Seismic Gas Shutoff Valve will be installed on the fuel gas line on the down stream side SPACING NAILS
of the utility meter and be rigidly connected to the exterior of the building or structure containing the
7/8" CEMENT PLASTER (PLASTER) ON PAPER BACKED METAL
fuel gas piping. (Per Ordinance 170,158) Not required for existing dwellings, or apt's, LATH 11 GAUGE, 11/2" LONG, 7116" HEAD @ 6"o.c. TO ALL 90
48"ox, 60"O,c
STUDS, TOP, SOLE PLATES AND EDGE BLOCKING..
JI
4- SHEAR WALL NOTES:
3/8" C.DX PLYWOOD WITH 8d COMMON WIRE NAILS @ 6"o.c. TO
+
PANEL EDGES (F1 & F2).. 132 32"o.c. 8.01, 60"o.c. +
4. Stucco and/or stucco with veneer over a plywood shear wall will be waterproofed with a minin-turn of
3/8*'C.D,X. PLYWOOD WITH 8d COMMON WIRE NAILS @ 4"o,c, TO
414 W�ce -A 15kP 9()�,60 Lnx&r-__ A D (2) 15# felt underlayments. 160
16'0.c. 48"O,C.
PANEL EDGES (F1 & F2).
Al 'C.D.X. PLYWOOD WITH 8d COMMON WIRE NAILS 4"o.c. TO
C C-4+
5. Only common nails. will be used for all plywood shear walls and -nail guns using "Clipped Head" or 1/Z 228
rcx��:, 7.0" 36"o.c.
PANEL EDGES (F1 & F2). 16"O.C.
sinker" nails are not acceptable.
1/2" C.DX PLYWOOD WITH 10d COMMON WIRE NAILS 4"o.c. TO
PANEL EDGES (FI& F3). 276 12"o.c. 5,51, 32"o,c�
4Q1- 6. All bolt holes to be drifted 1/32" min. to 1/16" max. oversized. ZL
1/2" STRUCTURAL -I PLYWOOD WITH 8d COMMON WIRE NAILS @ 328
7. Douglas -Fir (Group 11 Lumber) pressure treated sill plates will be used; Engineer to be notified for 12"o.c. 4,5" 24"o.c,
zi� 3"o.c. TO PANEL EDGES (111, F2 & F3),
redesign if other species sills are delivered to the site (or are part of existing building).
1/2" C.DX PLYWOOD WITH 10d COMMON WIRE NAILS
L7 3"o.c. TO PANEL -EDGES (FI, F2 & F3). 12"o.c.
360 24"o.c.
8. The following applies to all shear walls with a listed design load greater than 300 PLF:
15132" C,DX PLYWOOD WITH 10d COMMON WIRE NAILS @
Wo.c, TO PANEL EDGES (F2 F3). 400 12"o.c. 4.5" 24"o.c,
a) Provide 3x Sill plates for sills that resP
on concrete or masonry.
b Provide 3 x studs between adjacent anels. If it is necessary to use 2-2X members between 15/32" STRUCTURAL -I PLYWOOD WITH 8d COMMON WIRE
440
Z NAILS @ 2"o,c, TO PANEL EDGES (F2 & F3). 8"o.c. 4.5" panels, specifyi 16d nails with staggered nailing, and spacing no greater than the required
plywood edgeinailing,
FOOTNOTES:
15132" STRUCTURAL -I PLYWOOD WITH 10d COMMON WIRE
c) Provide 1/2 " Edige Distance for the plywood boundary nailing. A
520
NAILS C 2"o.c. TO PANEL EDGES F2 F3). 8"O.0. 3. 0" 18"o.c.
F1 ALL PANEL EDGES BACKED WITH 2-INCH NOMINAL OR WIDER FRAMING,
e) Plate washers are to be used with anchor bolts.
SPACE NAILS AT
PLYWOOD INSTALLED EITHER HORIZONTALLY OR VERTICALLY
-INCH
-To 5/3Z-8T. PLYWOOD WITH 10d COMMON WIRE 6 INCHES ON CENTER ALONG INTERMEDIATE MSTIs -Alp 1, 1 /2 bolt - 2x 9� x3/1 6 5/8 bolt - 2. 5x2.5x 1 /4 464
RI EDIATE FRAMING MEMBERS FOR 3/8
4.5,, 18"O.C, PLYWOOD INSTALLED WITH FACE FRAME PARALLEL TO STUDS SPACED 24
7/8" bolt - 3x3x3/8 NAILS Q To.c. TO PANEL EDGES Fl, F2 F3).
3/414
" bolt - 2.715x2.75x5/16 INCHES ON CENTER AND 12 INCHES ON CENTER FOR OTHETR CONDITIONS AND
0
A PLYWOODTHICKNESS.
1/2" 0,D.X: PLYWOOD WITH 10d COMMON WIRE NAILS
HOLD DOWN CONNECTORS g Yox, TORANEL EDGES-(F1, F2 & F3), 450 F2 WHERE PANELS ARE APPLIED ON BOTH FACES OF A WALL AND NAIL
ON ETHER SIDE, PANEL
SPACING IS t,ESS THAN 64NCHF-S ON CENTER
4
WITH 10d COMMON WIRE NAILS
4- 4- 15/32" �YWCrugAu':-_I,.� JOISTS SHALL BE OFFSETTO FALL ON DIFFERENT FRAMING MEMBERS OR
9. Plate washers are to The used on the back side of the HD post. See 6e. above for required slzep X, 3\,
- Yo c TO PANEL EDG�S (F1,.F2. & F3). FRAMING SHALL BE 3-INCH NOMINAL OR THICKER AND NAILS ON EACH SIDE
0
+
SHALL BE STAGGERED.
10. HD anchor nut to be tilghtened just prior to covering the wall framing. 15/32" STRUCTURAL-1, PLYWOOD WITH'8d COMMON WIRE
F3 FRAMING AT ADJOINING PANEL EDGES SHALLL BE 3-INCH NOMINAL OR
iar- NA'LS @ 2"o c. TO PANEL EDGES (F2 F3), 550
THICKER AND NAILS SHALL BE STAGGERED WHERE NAILS ARE SPACED
2-INCHES ON CENTER. THE ACTUAL SHEAR VALUES GREATER THAN 300 PLT,
11, Provide Deputy Inspewlon for hold down anchor bolts in tension. Unless the lower design values /A 15/32" S'TRUCTURAL-I PLYWOOD WITH 10d COMMON \V!RE
NAILS (g 2"o c. TO PANEL'EDGES (F2 & F3), PROVIDE - JX SILL PLATES FOR SILLS THAT REST ON CONCRETE OR
44
allowed by Table 26-E: for bolts in tension are shown on the plans as the design allowable HD load's. oc.
650 -1/2" EDGE DISTANCE
-3x STUDS BETWEEN ADJACENT PANELS
MASONARY
5 C.D.X. PLYWOOD WITH 10d COMMON WIRE NAILS FOR PLYWOOD BOUNDARY NAILING PLATE WASHERS SHALL BE USED
132"
V.c
I/Z'BOLT,2X2X3/`I6 5WBOLT-2,5x2.5x1/4
Jim-1, R�M 2'�ox. TO PANEL EDGES IF 1, F2 '& F3). IVC
WITH ALL ANCHOR BOLTS
See detail
12. See HD straps detail for number of nails and framing member sizes.
3/4"BOLT .2,75x2,75x5116 7/8" BOLT - 3 X 3 x 3/8 1"BOLT -3.5x3.5x318.
4
14
PLASTER, PLWYOOD, SEAR
MATERIAL SPECIFICATIONS F4 GYPSUM WALL BOARD, PORTLAND CEMENT
WALLS SHALL COMPLY WITH C.S.C. (SECTION 2513 TABLE 25
�7 13. Plywood: Product Standard PS 1-83, Douglas fir -Larch, Structural I (or CDX) FS SHEAR WALL RATIOS; GYPSUM WALL BOARD, PORTLAND CEMENT PLASTER,
-TO-LENGTH RATIOS 2 TO 1. WALL WITH IN
PLWYOOO, SHALL HAVE A HEIGHT
Particleboard: ANSI A208.1-1989. Note: Particleboard must be protected from moisture.
N EXCESS OF 1 1/2 TO I SHALL BE BLOCKED.
embe,.rs: Douglas fir -larch Grades PAL
14. Wood Framing m
Z f'AILA" Notify
RA, Engineer if other specifies of lumber are delivered to the site or are part of the existing cons truttior I.
2-2"W PLATE
15. Steel: Structural steell ASTM A36, Structural Pipe ASTM A53 dad B, Tubing ASTM A 501.
14 IF V 9 PF10' Reinforcing bars ASTNA A615. LA City Bldg Dept licensed shop required for shop welds.
Ic fOC .0
. . ..... 16. Concrete: Standard 2!500 psi concrete. 3000 psi for Grade Beams and caissons.
xbd
-S 5
V +
A -,tl�
t ?.06 e.-wiraliamO PSL headers and Beams
)Anowable Design Stresses
J
+6(100% Load Duration)
4
r7Aio mcdulus of clasticity G 1,25,000 psi
,
t
Modulus of aIasticjty E 2.0 X 106 psi
Fl.xusal stress Fb 2,900 psiM
1P..)J.CUIar to grain
13�t.,110 f� wiJc facc of strands F,, 750 psi(2)
prrjlW to grain F,11 - 2,900 psi
NAILING SCHEME
JOIST TO SILLOR GIRDERIOE NA11.
BRIDGING TO JOIST, TOENAIL EACH END
Md
--So-LrFL)�T-E-fO-f6iS-OkFL6C-KI-NG7TYPICAL -FACE _NAIL ________
S0I,-'PLAtTFTOIQIST0 BWU66, AT BRACED WALL PANELS
16d@16'oc
3.I6d.pLr16*..
TOP PLATE TO STU9109 ,-RA1L
COLIBLE STUDS, FACE NAIL
2-16d
4-8d I
16d @ 24* oc
DOLIBIL
16d @ IF oc
D'JBLE TOP PLATES LAP SPLICE
BLOCKING BETWEEN JOISTS OT RAFTERS TO TOP PLATE, TOENAIL
RIM JOIST fd_TOP _PLATE. TOENAIL
_3-8d_____
8d @ Foc ......
-
TOP PLATES, LAPS AND INTERSECTIONS, FACE NAIL
2.16d
CEILING JOISTS TO PLATE, TOENAIL
3-8d
LIf CONTINUOUADER TO STUPTOENA1_L__... ,_
4-8d
JOISTS, LAPS OVER PARTITIONS, FACE NAIL
3.16d
—CEILING
CEILING JOISTS TO PARALLEL RAFTERSFACE NAIL.
3.16d ......
RAFTER TO PLATE, FACE NAIL
BUILT -LIP CORNER STUDS
16d0roc
TPLANKS
2.160 EACH BEARING
3 1ARMAY101 11?12
-X-4" STUDS I—` I ',.
�, 4 -, o I I I I
Jjr pfp.ndicular
It M
,11`7
to wider f3cc of strands F, 2!90 psis
'
1_'-arch depth. For I 14 b
0 Lh a S, mu tip y y
>111 not be inci a)t;d for durations of load
Allowwswe fiesign Properties
4
(100% Load IDurution)
13/4" 2.OE Paralllam@ PSL enetrall Assumptions for
_-N
NOTE.,
H EA 0 r-OCH- 5,rAl4CH IONS �aL
Non -Treated ParallanIs PSL
• Non -treated, dry -service conditilm only,
• Lateral support required at bearing and 24" on -center
maximum.
I ; . I I - Bearing lengths are based on rarallarn PiLs earngstesi
1 4
V 11/4 of 750 psi,
o camber.
211/1,;" ZOE ParallamO PSL - IN
- Tables on pages 4-7 include load reductions applied in
Wvpth
91/4" 9112" accordance with code,
111/4, 1117141, 14" 14.'f. e"
NAY
A
T
ffTN 4 i�x li �-PT
N C -4Z, 5
kA
FOP, qEN �_TAIF,5
511!�� A -35 F--Q5F- 5 1 "TYFE',1('
3 DTff__X'
IJ V4�4 COLTS
Mf N P,5t, PLATE
!.S
tTAt'4 Z:M To N
vz 1,
M15
94 I,�HEKS�
'
5-
x ,t
-A
15Lvie
Z:
k
Design Property
Depth
9)1111
91/1 "
111/4 "
11 171$�'
1 J
6,210
6,530
8,985
99,950
13,580
(IL ')
_,l
3,130
3,215
3,805
",020
4,735
Moen_. I -1t of -1 " -1.-r -L i_r _( i
115
125
208
244
400
W.ight I pli)
1
5.2
6.2
6.5
7.7
Nlunje,tt (ft-ILs)
9.535
10,025
13,800
115,280
20,855
26,840
33,530
SI1 (Jb,)
4'605
035
5,845
t6,170
7,275
8,315
9,350
05
192
319
375
615
917
1,305
(lift)
7.9
8,0
95
10,0
11.8
13.4
15.1
I
3-1A," 2.0f earalliam@ PSL
Mepth
9,/1
911a"
111/4"
It 1 71ft'
14".
1:
M.,L Ib,)
0,415
13,055
17,970
11'
34,955
43,665
I L1 (Ib,,)
6,260
6,130
7,615
l8l,�'75'
10,825
12,180
I- Z 6-fl,�7)_
231
250
415
`188
goo
1,195
1
1,701
I W�%I,t (plo 1
10.1
10.4
12.3
13,0
15.3
17.5
19.7
5t/4" 2A)E Paralllatn'05 PSL
'Ph"
91/2
11 th "
1117 14
4
Mallwilt (fir lb;)
18,625
19,585
26,955
2?9,855
40,740
52,430
65,495
Sfiv,r (11,$)
9,390
9,645
11,420
112,055
14,210
16,240
18,270
Nigh w of hwt tw (t".")
3-'16
375
623
733
1,201
1,792
2,552
(1.1i)
15,2 ,
15.6
t8'5
1915
23.0
263
29,5
7" 2.0iE eair"iiai& PSL
Depth
ga1 Y
91/4"
9 11g 11
11111" J
111 71p
14
14
1 V
tfIVII.Lilt
24,830
26JI5
35,440
39,805
54,325
69,905
$7,325
1010
12,855
15,225
116,070
18,945
21,655
24,360
til
462
500
83)
977
1,601
2,389
3,402
4,02 ,
20'8
24.6
26.0
30.6
35.0
39.4
• 1314X 16 " and 13/4" x IS" beami require multiple pl-ol.
See pa&lz 17 for multiple member beftr)
4J ,I
A
7
V
0`
Vo
4
r
,ale '-- QJ"
N Att
1;,' C)t,
�� ll
Apr ..: k1.. .:�►; {cy� "�•�• 1t�:i 10
'tow.✓ O t, \�"
lia-
}z (T v
t
I � I
2eX 4 e-Tv v C9 i(ol 0c,
C"x,4' FT GILD W/�/f;voxav
AO fS C1:7P_f• fl Aft
4 ` t 04t
s
ww•+w�wrwc. _.. .
. •r
Ho L VFW N :PN�
rwrr
i 711/ ftf - r r Ill
in
`►
V94"IST Ulu l'..'",
,' - _. 2'IX �•-li �-�'u� � ICE ��r��. ...
a*,15 Mr 4r' ;L�.-I 5<:.> txGL'Z�
Ii /Z'IIX ail }�- li��L.L.. 1lVl
_ . Col 'I' X i.
"1,
i fit
77
/° •',t
}• IL
'
tie4 9 ZM 6J_ CCWr1>
� o
Scl t'znl N �,r fKTO e x d _
LA AR �t 2011505
f;.00 -401 +o fit `
;.T,,..
so_ w,...-
m
:
-- ---..._... _._._...._
Ill
r
r
'
rrl
7
bfLn
L 1 ' 0let,q70
bArEcifs f
f�-Alt
_r
T}' y��(J,o'¢�t i��A_.__....:.<i#�r'�fyd"
{i/Qi
�� y(i •r �` x.+,f^. G',{{.,i�%Q�+
'ib r'/yj`, � i
...
t
�
per... •'...,�'J '�fj •
t��tS�T�
.i`-�Ny�ya. 7 .��7
''"ri�i'/gCX/
!'1V-ti!���I �,. �'i��'
.�f',y>it7���^. `I '"Y K NF'
""t �t �• f..:
I'^n Fit ; Hi;; A LSF, -4X'q Mli.t, per>-!, OF-
^ tr,A V30 C-,
�> - i�i'I�a Q �hjT�`i" �;�. (lv� ✓;✓� ✓�; %c$..; �µ� . t f� � !rl�v,{�
$. w
lr� 1.
1�_A
vJ AY
1�=X C i> .. t:.. :: �..M:ltti lt•.�il�M
'
f i �c :
.
7 c�" e>G
"7'I .. ..
"i , l t4
:,-
��t�'I'�r^�•�.�"�=rev.9.�I�.'��::�^Cs,,,3�-N�'�•,:,v�::'.-9��_,,_.:.:�-�9'��.r_-�:.'�fi:aN�Et�.:.`:•��_�:1�•�._:tl�,`)._Ytt-���y�/
...!5..��I`.�.-1G. (, �i.✓ m... v.:l,F•':.~._.,L! 2�.t. ,�.' �. G.-{!'Z. .?�....�,..f,d.rc._..y•y.
..ii..%i...:-{�,�F?t.w•.,.`.rt. G.,t�'.:!.: �•.
1
iix ill .•-�-,l.:.r) (Z E& 11.
t • � y� r r I d a II C%'1,fr 1& W ! U'1-4
alix (pi! ff e. IL I W/ � I
!,
•;J �' �I
�� i I�; � • f
i `' Z l
�� tt
Epoxy -Tie •
Insert cartridge into dispensing tool,
RESIN WfiENER
Preparation •
Remove plugs from cartridge and attach a mixing nozzle. Before
injecting, check that nozzle is free of gelled or hardened material,
•
Dispense bead of Epoxy -Tie off to the side to check for
proper mixture (a uniform gray color) before using.
a
Tighten retaining nut on nozzle. DO NOT OVER -TIGHTEN,
•
Caution: Epoxy will start to harden in the mixing nozzle after
7.8 minutes. Epoxy will harden faster as the air temperature
increases. Replace nozzle to avoid blowouts
the write resin undergoing
It using a pneumatic dispensing tool, air pressure must be
and black 262,t44
regulated at 80-1 OO psi,
hardener mix separations
automatically before being
A partially -used cartridge may be stored up to one year for
in the nozzle, dispensed.
future use. Store at a temperature above 45°F.
Installation into CONCRETE
;'• of •,r'pot: 0 Y:. .Ar 0 # ., ;0. 'Qt C, # ,• •,� O' # ..l
,.•o 'p, $ '"� ,0 • °p •.: "�O ♦.'0a •, •i0 -.0 i
°0
•mo0oo ° i 00
R o°.0 °°: ° p•^°°�p.•p.�t °,•: O
p•0p°g° .•0*qr0
'00 O% •
°•°.
f ' •Q o ••
• V u'• o o ad oo ea
•.� ,b a '11 •� '0' ' •.� s O '•tl : O '•� : 0
0 p• • .. 6> 0 O Q • .. d d o o • . b• d O'p' • .. !:1 O • •. 9 O
O .. G .. O' n O •. O• •.
AV
Drlli--Drill hole to the Clean —Remove dust from Fllh—Dispense bead Insert —Anchors must
specified diameter and hale with oil•free compressed of ET off to the side to be clean and oil free.
depth. air, Clean with nylon brush check for proper mixturs Insert anchor, turning
and blow Out remaining dust. (a uniform gray woo slowly until the anchor
Dust 0 in hole will reduce the before using. F0i hole hits the bottom of the
� �. • epoxy's holding capacity, halfway, starting from hale. Do not disturb T46.810
•
bottom of hole to avoid during set time,
air pockets,withdraw
nozzle as hole fills up•
i•twt ��r�ft'•'•n72Viwso
i *y,1..�1Sjf
( l
*J✓
C
,
_7/4"
JC)J �' :NPz0A ,a�1 �� 1-11a"V, a 4- t"o(P S. 9„
( f;Ql"Z IriG' °F H25/4 L6 ¢rXei f_`I!l,.11 pc�, ciz -;,"X- 4
r U HpgA -r M Pifh4 U3 � . 4 X is IA l f.! , FP5- .
j'�.✓'.-J t"I �''n Q ?.�11}t°•t"" O r•' t�!*•t"dt (*:-'i ",�,.�:. ✓, •. ,.. r ....+, ,.��
ry „ `l {
� � z
e
Cyr SF•OMM
f
waillill
CETIFICATE OF COMPLIANCEt RESIDENTIAL. (P*90_ I of 3) CF-IR
4k* M K -.1 . .... z
V-1
601sr
Pr-a_esie
AQUILED HERNANDEZ (562) 927-3123
ikrsxetwttratratt iz,"—or Tokophent
0wor""O" "Remy vat UMY
PACKAGE 'D'
cowwwe- poww— ze-60('4P or cow~)
GENER&_ 1NF_aRftATJaN.
-
TOTAL CONDITIONED FLOOR AREA AVKpAi5E C-91LINq HE10iTs AFT,
. 't"J.
CEINDITMWED SLAB FLOM ARFA��*41' S $IN NG GL LE
BUILDINrx TYPE, I E FAMILY ADDITION
(CHECK UK OR MORE) WJLTI-FAMILY EXtSTING-MUS-ADDITION
FRONT ORIENTATRIM
*4wt i;:ont Orientation in degrees from MX tm-ni and drcte one)
NUMBER OF DWELLING UNITS, �")i
FLOOR CONSTRUCTION TYPE, 'L!1114 Ircte one or both)
t n'! I-) �1_
RARI I sr_*2ktd_ in cumt*_ REQUIRED FOR THIS �UBMITTAL_ZYES No
COMPONENT FRAME TYPE CAVITY Shooting Tot*( Assembly Location/Comments
TYPE wd=wood Insulation InskAoAlon 11-Value U-Factor (4tt1c41arAQe,.typICQ(,*t,0
sti;mst4wt R-Vatue R-Value R-13
WALL.. �WMD R-13 13, F
12 0.088 .,XTERIOR
WALL WOOD.
WgOD R-30 30 -M--8,040 ATTIC
R013F WMR. 12, 19 , "04 FLOOR WOOD -19 Al [Lgo
MOM
W EDGE 0 -0
For P"$Cr*,dV# CW"WM*, Totet R_VaU0W end #jMWy li-fa~ are not r*qWr" for & WOOd-fr*$Wd 004, that wefts Cavity
Il_Vatus h"utatien t#q44woonts for v* Proscriptive package,
FE_NE;TRATL�&
Fenestration Orientation Area <ft*) Fenestration Fenestration Exterior averhungs/
#Type/Poa, U-Factor* Shoding. Att, Fins
F 3' STANDARD N/A
I Ltjf�
DUAL
ROAR 7 N GLAZING
�LEFT_ V
RIGHT E
A-0 I
Compliance Form 11, -
CETIFICATE OF CowLIANCE
-IR
Project Due Date
COWLIWE STATEMENT
THs cvrtfto�,t of compliance
Vo b4dlng features and performance spedfIcatlans needed to comply with
TIA* $4, Pwi 1 1 and 6 Of
*W 44"irtistrat'" "Ouliltkm to ""n*
*W^ TtAX cw!�Wkmt* has boom Signed by *W Individual 60h owatt desism r*#poAs#AI-ty. Vhon thIX'9*r*1f144*&
of cWWAi"We to submitted for a sww* building plan to be "i In NA*O* orlon*4*lons, any *I-4*V feature that
is vw-*d is in4ro.t*4 in the
F***"s/RoWkS section. The undorsiiiiir" recoOZO that COMOWWQ using
duct s#w" Intl TXVS pqq%orit instatr tesjinG ow copwicaton,
Documentation Author
Now 14A M A RP N 9 Z, N*vw AQUILEG HERNANKZ
IPm OWNER DESIGNER
Addrii" /qt9!5 W (a Addrosso
Totephonet 7 312 3
LICA,
AT Twel
(date)
Compliance Form A-4
MANDATORY
CASURES CHECKLISTi RESIDENTI&_ (Page 2 Of V W-IR
Natal Lowrise residential buRdInGS
to the StondArds+ must contain these measures
regardless of the compliance approach used items marked with an asterisk (0 may be
sWersedec I I by r4ore strkVerrt compliance requirements listed on the Cer-tifica-tv of C0140lonc,
When this t;hocklilst is kvcorpora-tod Into the permit documents, the features rool ad sh*Lt be
considered Iv ott parties as rAnkwm component performance specifications for the mandQtory
measures thether
Instructit), s! Check or Initial appUcAble boxes when completed or enter N/A If not oLppilcabite,
I IX
SPACE 0MT4,404 W410 HrATW4 AM PLUMBING, SYSTEN WASURES` (coryWom4D
Lv" Phl:'11,, -.-4
L
or,,* i;,q#n0w instoMed, xleatod and bwOAted to meat the r0quirt"On't
of #j_e
;CWS*ectlan 66t., 60, 604,. and Stqndord 6-3; ducts WwA*ted to
& m1n*lA-, instak , ted, level Of R-4.e or enclosed *"W41Y in conditioned space.
Openinox,**(I be staAed with mastic, tape, AeroAot Sealant, or other duct-
ctosw& f,1stem *hot meets -W* of ULISI, ULISIA, or
U1.1811 4i tq"tic or *4p* is used to seal openings greater,
1/4 kx::h, the
Of "Ste " vKher mesh or tape shatt be used. SlAding cavities A
seams of duct
adhesive, duct "pe untess such tape is used )nI combination with mastic and P
MdkV- covK*s, suppOpt pta-vforms for air handlers, and pionums def Ined or P
flexible fAxt shdA not be used for conveying comdt$oned air, StAdino cavities
and support ;A6+fOrMX may C*** ducts. Ducts frtsto.1led In cavities and
suppo
t pt*tforms shatt not be compi-essod to Cause r*dwctk)ns In th* CMSS- L
sectlot'lat *r*6 of the ducts.
a Johts and staims of duct systems
seated
0th cloth back rubber odhtslve duct
is used in
combination with mosti
and druiviaonds,
E
4. Exhaust
systems.
Gruylty viontKaft syst44111; serving conditioned space have *1~ autOmOtlC1
or readily 4ccVsS1bt#, MQnUQdY Operated CIAMPOM
Prot
from dome6ol
WkWing that du* to sunticht,
equOwnt ftIr1t*n&C*- and 04 but
not UNted +0 . the fojto
*V Insulation exposed to Weather. Sh*U be'SUItAbt # for
outdo&, sg
paint d ,� canvas
or
plastic cover. Coilu*r f*Aft insulation
be protected as above Or pointed
with 4 cj
ShI4109 from Wsr
p6diatlov,
cause 4eV*4I&tw of the MtOrIAL
114, Pod and $pp. Hou" Systems and Clquipment A
L System is certified with 718Z thermal, affobncy, on -off switch, We
oof P
opero" instrucilons, no OWCirt r*sIs%Ace ho&tlno and no pilot
P
P. systems in Installed witiv L
o. At least 36' Of PIP0 b
"*n fitter and heater for future solar hQQ"
A Cover for outdoor /
ls or outdoor Spas.
c. Flue
E
a POOL XyXtM hai 41rectionat K
ts and a cIrct"tion Pump time switch, S
115 Goa fired control
4a hootom or household
cooldng Appliance* have
electric *1 coowv awlances with pit0*000 9,tuAV%)
(0 Cool Roof material; Meet SpW"d criter4o
.LiGmnw MEMURCS,
5% <>I., 't.w*%irs
mps with an
*fPlcl*ncy of 40 lu"ns/v4t* or
'40h,ft Con" Panel at an *ntr*nce to the kitchen,
I5D(<)ej, Rooms wIth a shower or bathtub must
01ftw at least one
with 14ros with an efficacy of 40 tumens/wott Or Greater switch
at �he entrance to the room or 0* of the
to this requirement
109110 In § 1500a2,1 and Incandescent recessed Ceting fixtures are IC APPLIES
an lo`*w -cover)
Comptianc Form
A�WIJPT' tvrAL� -;; 1,611 5qrT;:-- 15.517.-- -zo7,
HA ANT BARRIERS:
A RADV4r� BARRIER, IS MATR.RIAL THAT EITHER REFLECTS RADIANT HEAT OR INHIBITS THE EMISSION OF RADIAN' HEAT.
ALUMINUM FOIL OR PLASTIC. WITH A REFLECTED FILM COATING, ARE VOWLES OF SUCH A MATERIAL INSML�43`�4
i'i 'Y
OF RAOMT BARRSRS HAS THE GREATEST SAVINGS POTENTIAL DURING THE COOLING SEASONS, ALTH06-GH
pROMDE SOME HEATING BENEFITS AS WELL
WTALLATION
THE FOLLOWING CONDITIONS ARE REQUIRED:
1. SECURELY INSTALLED IN A PERMANENT MANNER WITH THE SHINY 6100 (THE SIDE WITH THE LOW EMITTANCE) FACING
DOWN TOWARD THE ATTIC FLOOR. WITH MATERIAL:
2. INSTALLED TO THE ROOF TRUSSIRAFTERS (TOP CHORDS) IN ANY OF THE FOLLOWING METHODS, THE
DRAppED OVER THE TRUSSIRAFTER (ME TOP CHORDS) BEFORE THE UPPER ROOF DECKING IS INSTALLED.
& SPANNING BETWEEN THE TRUSS/RAFTER Crop CHORDS) AND SECURED (STAPLED) TO EACH SIDE
4. SECURED (STAPLE) TO THE BOTTOM SURFACE OF THE TRUSS'RAFTER (TOP CHORD). A MINIMUM AIR SPACE MUSTSE
MAINTAINED BETWEEN THE TOP SURFACE OF THE RADIANT BARRIER AND ROOF DECKING OF NOT LESS THAN1,4 I INCHES
AT THE CENTER OF THE TRUSSMAFrER SPAN.
S. ATTACHED (LAMINATED) DIRECTLY To THE UNDERSIDE OF THE ROOF DECKING. THE RADIANT BARRIER MUST BE
LAMINATED AND PER.'40RATEO By THE MANUFACTURER To ALLOW MOISTURFUNAPOR TRANSFER THROUGH THE ROOF DECK
6. ASTM Cl ISO -go IS THE STANDARD FOR USE AND IN I STALLATION OF RAIDIANT BARRIER SYSTEMS.
7. THE RADIANT BARRIER MUST BE INSTALLED TO COVER ALL GABLE AND WALLS AND OTHER VER11CLE SURFACES IN THE
ATTIC.
6. THE MANUFACTURER OF THE RADIANT BARRIER MUST PROVIDE'I ES'1 DATA, DOCUMENTATION, OR PRODUCT LABELING
StiOWINS CONFORMANCE To CERTIFICATION REQUIREMENTS.
smiSSIVITY
THE EMISSW" OF THE RADIANT BARRIER MUST BE EQUAL TO OR LESS THAN OAS ASTM TEST METHOD C-1371.67 IS
THE STANDARD.
AVID 01DAOW
METHOD 1: RADIANT BARRIER DRAPPED
OVER TOP OF TRUSS/RAFTER
CETIFICATE OF COMPLIANCE, RESIDENTIAL (ftQ8 2_Of 3) CF-IR
MANDATORY
CASURES CHECKLISTi RESIDENTI&_ (Page 2 Of V W-IR
Natal Lowrise residential buRdInGS
to the StondArds+ must contain these measures
regardless of the compliance approach used items marked with an asterisk (0 may be
sWersedec I I by r4ore strkVerrt compliance requirements listed on the Cer-tifica-tv of C0140lonc,
When this t;hocklilst is kvcorpora-tod Into the permit documents, the features rool ad sh*Lt be
considered Iv ott parties as rAnkwm component performance specifications for the mandQtory
measures thether
Instructit), s! Check or Initial appUcAble boxes when completed or enter N/A If not oLppilcabite,
I IX
SPACE 0MT4,404 W410 HrATW4 AM PLUMBING, SYSTEN WASURES` (coryWom4D
Lv" Phl:'11,, -.-4
L
or,,* i;,q#n0w instoMed, xleatod and bwOAted to meat the r0quirt"On't
of #j_e
;CWS*ectlan 66t., 60, 604,. and Stqndord 6-3; ducts WwA*ted to
& m1n*lA-, instak , ted, level Of R-4.e or enclosed *"W41Y in conditioned space.
Openinox,**(I be staAed with mastic, tape, AeroAot Sealant, or other duct-
ctosw& f,1stem *hot meets -W* of ULISI, ULISIA, or
U1.1811 4i tq"tic or *4p* is used to seal openings greater,
1/4 kx::h, the
Of "Ste " vKher mesh or tape shatt be used. SlAding cavities A
seams of duct
adhesive, duct "pe untess such tape is used )nI combination with mastic and P
MdkV- covK*s, suppOpt pta-vforms for air handlers, and pionums def Ined or P
flexible fAxt shdA not be used for conveying comdt$oned air, StAdino cavities
and support ;A6+fOrMX may C*** ducts. Ducts frtsto.1led In cavities and
suppo
t pt*tforms shatt not be compi-essod to Cause r*dwctk)ns In th* CMSS- L
sectlot'lat *r*6 of the ducts.
a Johts and staims of duct systems
seated
0th cloth back rubber odhtslve duct
is used in
combination with mosti
and druiviaonds,
E
4. Exhaust
systems.
Gruylty viontKaft syst44111; serving conditioned space have *1~ autOmOtlC1
or readily 4ccVsS1bt#, MQnUQdY Operated CIAMPOM
Prot
from dome6ol
WkWing that du* to sunticht,
equOwnt ftIr1t*n&C*- and 04 but
not UNted +0 . the fojto
*V Insulation exposed to Weather. Sh*U be'SUItAbt # for
outdo&, sg
paint d ,� canvas
or
plastic cover. Coilu*r f*Aft insulation
be protected as above Or pointed
with 4 cj
ShI4109 from Wsr
p6diatlov,
cause 4eV*4I&tw of the MtOrIAL
114, Pod and $pp. Hou" Systems and Clquipment A
L System is certified with 718Z thermal, affobncy, on -off switch, We
oof P
opero" instrucilons, no OWCirt r*sIs%Ace ho&tlno and no pilot
P
P. systems in Installed witiv L
o. At least 36' Of PIP0 b
"*n fitter and heater for future solar hQQ"
A Cover for outdoor /
ls or outdoor Spas.
c. Flue
E
a POOL XyXtM hai 41rectionat K
ts and a cIrct"tion Pump time switch, S
115 Goa fired control
4a hootom or household
cooldng Appliance* have
electric *1 coowv awlances with pit0*000 9,tuAV%)
(0 Cool Roof material; Meet SpW"d criter4o
.LiGmnw MEMURCS,
5% <>I., 't.w*%irs
mps with an
*fPlcl*ncy of 40 lu"ns/v4t* or
'40h,ft Con" Panel at an *ntr*nce to the kitchen,
I5D(<)ej, Rooms wIth a shower or bathtub must
01ftw at least one
with 14ros with an efficacy of 40 tumens/wott Or Greater switch
at �he entrance to the room or 0* of the
to this requirement
109110 In § 1500a2,1 and Incandescent recessed Ceting fixtures are IC APPLIES
an lo`*w -cover)
Comptianc Form
A�WIJPT' tvrAL� -;; 1,611 5qrT;:-- 15.517.-- -zo7,
HA ANT BARRIERS:
A RADV4r� BARRIER, IS MATR.RIAL THAT EITHER REFLECTS RADIANT HEAT OR INHIBITS THE EMISSION OF RADIAN' HEAT.
ALUMINUM FOIL OR PLASTIC. WITH A REFLECTED FILM COATING, ARE VOWLES OF SUCH A MATERIAL INSML�43`�4
i'i 'Y
OF RAOMT BARRSRS HAS THE GREATEST SAVINGS POTENTIAL DURING THE COOLING SEASONS, ALTH06-GH
pROMDE SOME HEATING BENEFITS AS WELL
WTALLATION
THE FOLLOWING CONDITIONS ARE REQUIRED:
1. SECURELY INSTALLED IN A PERMANENT MANNER WITH THE SHINY 6100 (THE SIDE WITH THE LOW EMITTANCE) FACING
DOWN TOWARD THE ATTIC FLOOR. WITH MATERIAL:
2. INSTALLED TO THE ROOF TRUSSIRAFTERS (TOP CHORDS) IN ANY OF THE FOLLOWING METHODS, THE
DRAppED OVER THE TRUSSIRAFTER (ME TOP CHORDS) BEFORE THE UPPER ROOF DECKING IS INSTALLED.
& SPANNING BETWEEN THE TRUSS/RAFTER Crop CHORDS) AND SECURED (STAPLED) TO EACH SIDE
4. SECURED (STAPLE) TO THE BOTTOM SURFACE OF THE TRUSS'RAFTER (TOP CHORD). A MINIMUM AIR SPACE MUSTSE
MAINTAINED BETWEEN THE TOP SURFACE OF THE RADIANT BARRIER AND ROOF DECKING OF NOT LESS THAN1,4 I INCHES
AT THE CENTER OF THE TRUSSMAFrER SPAN.
S. ATTACHED (LAMINATED) DIRECTLY To THE UNDERSIDE OF THE ROOF DECKING. THE RADIANT BARRIER MUST BE
LAMINATED AND PER.'40RATEO By THE MANUFACTURER To ALLOW MOISTURFUNAPOR TRANSFER THROUGH THE ROOF DECK
6. ASTM Cl ISO -go IS THE STANDARD FOR USE AND IN I STALLATION OF RAIDIANT BARRIER SYSTEMS.
7. THE RADIANT BARRIER MUST BE INSTALLED TO COVER ALL GABLE AND WALLS AND OTHER VER11CLE SURFACES IN THE
ATTIC.
6. THE MANUFACTURER OF THE RADIANT BARRIER MUST PROVIDE'I ES'1 DATA, DOCUMENTATION, OR PRODUCT LABELING
StiOWINS CONFORMANCE To CERTIFICATION REQUIREMENTS.
smiSSIVITY
THE EMISSW" OF THE RADIANT BARRIER MUST BE EQUAL TO OR LESS THAN OAS ASTM TEST METHOD C-1371.67 IS
THE STANDARD.
AVID 01DAOW
METHOD 1: RADIANT BARRIER DRAPPED
OVER TOP OF TRUSS/RAFTER
CETIFICATE OF COMPLIANCE, RESIDENTIAL (ftQ8 2_Of 3) CF-IR
A�WIJPT' tvrAL� -;; 1,611 5qrT;:-- 15.517.-- -zo7,
HA ANT BARRIERS:
A RADV4r� BARRIER, IS MATR.RIAL THAT EITHER REFLECTS RADIANT HEAT OR INHIBITS THE EMISSION OF RADIAN' HEAT.
ALUMINUM FOIL OR PLASTIC. WITH A REFLECTED FILM COATING, ARE VOWLES OF SUCH A MATERIAL INSML�43`�4
i'i 'Y
OF RAOMT BARRSRS HAS THE GREATEST SAVINGS POTENTIAL DURING THE COOLING SEASONS, ALTH06-GH
pROMDE SOME HEATING BENEFITS AS WELL
WTALLATION
THE FOLLOWING CONDITIONS ARE REQUIRED:
1. SECURELY INSTALLED IN A PERMANENT MANNER WITH THE SHINY 6100 (THE SIDE WITH THE LOW EMITTANCE) FACING
DOWN TOWARD THE ATTIC FLOOR. WITH MATERIAL:
2. INSTALLED TO THE ROOF TRUSSIRAFTERS (TOP CHORDS) IN ANY OF THE FOLLOWING METHODS, THE
DRAppED OVER THE TRUSSIRAFTER (ME TOP CHORDS) BEFORE THE UPPER ROOF DECKING IS INSTALLED.
& SPANNING BETWEEN THE TRUSS/RAFTER Crop CHORDS) AND SECURED (STAPLED) TO EACH SIDE
4. SECURED (STAPLE) TO THE BOTTOM SURFACE OF THE TRUSS'RAFTER (TOP CHORD). A MINIMUM AIR SPACE MUSTSE
MAINTAINED BETWEEN THE TOP SURFACE OF THE RADIANT BARRIER AND ROOF DECKING OF NOT LESS THAN1,4 I INCHES
AT THE CENTER OF THE TRUSSMAFrER SPAN.
S. ATTACHED (LAMINATED) DIRECTLY To THE UNDERSIDE OF THE ROOF DECKING. THE RADIANT BARRIER MUST BE
LAMINATED AND PER.'40RATEO By THE MANUFACTURER To ALLOW MOISTURFUNAPOR TRANSFER THROUGH THE ROOF DECK
6. ASTM Cl ISO -go IS THE STANDARD FOR USE AND IN I STALLATION OF RAIDIANT BARRIER SYSTEMS.
7. THE RADIANT BARRIER MUST BE INSTALLED TO COVER ALL GABLE AND WALLS AND OTHER VER11CLE SURFACES IN THE
ATTIC.
6. THE MANUFACTURER OF THE RADIANT BARRIER MUST PROVIDE'I ES'1 DATA, DOCUMENTATION, OR PRODUCT LABELING
StiOWINS CONFORMANCE To CERTIFICATION REQUIREMENTS.
smiSSIVITY
THE EMISSW" OF THE RADIANT BARRIER MUST BE EQUAL TO OR LESS THAN OAS ASTM TEST METHOD C-1371.67 IS
THE STANDARD.
AVID 01DAOW
METHOD 1: RADIANT BARRIER DRAPPED
OVER TOP OF TRUSS/RAFTER
CETIFICATE OF COMPLIANCE, RESIDENTIAL (ftQ8 2_Of 3) CF-IR
f
Vale
HVAC SYSTEMS
voter *04V $ysu", *xmt sesk" *00V 1.0"
Equipment
Distribution
Type and
Duct or Thermost at
PW4 TYPO
WQ* flu*
C4ft"0"%Wi
Type Ournam heat
EF LocAtIon
I An "I G A
W A t1l,
Cot Z010 00
51.T.0 .14
T�Mcq=
tner,
Mirw"
Efftleney Location
Duct Th*rF%Ort0
0004"tiOn
Type
SCALED VXTS AND TXVs (OR ALTERNATIVE MEASURES)
Ri 49%mvm 4rllh... I— and Hms rotor field verification r*qAred}
anst4a*r testing and certifteatiarac
. XVsroavl(Laccossigo ltdk4to zones 2 and q-13' ont�>
I t od
n$ 'Otter testing and covtific0lons and HERS rotor field verification rtq*
eRefrigerant Charge/AN' Row (C44te zones R and 0-13 only)
qnstatior, testing and ctrtifIcAtions and HM rotor Field verification required)
OR
eAtternativg *0 Seattd Ducts " TXyfx <s" package C " 9 Alternative features for proJOCt Climate Zonof
Cti"6+0 zone Wirldow SHGC Window U-Factor SEXR tfeauv
WATER HEATING SYSTEMS
Rotow yank factor W Tank
Water Heater Vstr*ution kmber Iroji, (kW Capacity Recovery Standby` Insulation
Ty In jXstom or 11ti/hr _fPfilziency LossW R-Vatuo
(E> GAS APPLIANCE, 6RF 454T 1 21000 40 GALS.. _036 7CO 12
1. For sft%t gas storage water 1164tws (MW inputs Of less than or "Ijotto 73fio btu/W), electric
and heaters IPU
heat Pump wa+tr beat", list En"y Factor- F0' large gas st0r*i?0 water (rated V t *F' W top
than 75,M btu/hr), list Rated Input, Recovery EffICIOPICY and Standby Lose, For 10~t9ma 9" water heaters,
list rattd input and recovery of fk*ww*m
SPECIAL FEATURES (add extr-Q sheets If necessary), Package C and D, TXV5, Seated Ducts, Radiant
larriors <set Installation requirements for radiant barriers in Se~ 913 of the MI Residential *rmtl
Package 0 thermat mass type, covering, thidmegs, and descrtrtionX
compliance, Forms
im 1- 41 rldtlt N A T TfUt ccrvi IT0rK#r'NT.1t
MINIMUM R-VALUE PIPE DIAMETER
SYSTEM Less than or equal to a inches Less than or equal to 2 k1tCht'S
Domestic hot water,
HydronIc heatin twety-Lin-ea,
L_LWijrg systems (olpj_ below Tf F) 11
AIR SPACE
F DECKING
RADIANT
BARRIER
INSULATIO
JOIST--/
RAFTER
f
METHOD 2: RADLkNT BARRIER ATTACHED
BETWEEN TRUSS/RAFTER
{ RESIDENTIAL (Page 3 ot 3) CI:'
tints
the CWWwvk CO* Of Regulations, and
Special
and field ver4ficomom by an *PProved WM rQUr-
DeOWIel- a, Owner ,per business and Professions Code}
Title/Firm
• •
r
'
subject
they are shown elsewhere in' the doccuvwnts or on this checklist only.
Alt 04. 1' ti
:
the
shalt not 1x# used for corweying conditioned air. Joints and
systems itrid their componeffts st4tt not be seated with cloth back rubber
r
and tW#k cOmponontS. silakt not be
tapes untess such ,apt
c
Pan systems hove back draft cr,autonatic dampers.
ection of InstA*tkn Insulation shalt not be protected
moisture,
i. s. Mr
rvicq e4, protected by Aluminum, sheet metal,
,
shalt
)4ting that is water retardant *r4 pr*vtdesr
that .can
atherpr
tight.
e,
moo
damper and,
ar
furnaces, poot heaters,
no contbiousty burnino pilot light. (Exceptiont Nan- APPLIES
118
for gonerai- lighting in, kitchorw sh&tt have ta
greater for gwwrQt Ugh"V In kitchens -
This fprwrat Ught1rq $Wt be contrW*d by a switch Oin, a readily accessible APPLIES
have
to Ira
alternatives
• approved,
TABLE I-Z$-ALTERNATIVE C001INEOTS
0
COMPONENT
BUILDING ENVELOPE
InstA4,tion minimume
Ceiling ------ 1._R30 --------- R30 R38 R30
Wood -frame waits ----- --- R13 Rel RI.3
9*4vey mass, *oil$ --------- RL6 NA (R
44)
'Light mass' 1041ts --------- R4.0 --------- R4A MA NA
NA RO
Stab floor perbotor
..... "...NR R7 NR
Raised floors --------- RI3 Pit) RASP
Concrete raised Aws --------- NA --------- MA NA R0,
Radiant barrier REQ
GLAZING
Maximum U Yalu* factor, - - ------ --------- 045* 0.50
715
--------- 14% 14Z ROX
Maximum total nonsouth facing or*9 916X -------- MR --------- MR ---------- MR
M"mum south facing area --------- C0 --------- MR -- - ----- MR ---------- MR
SOLAR HEAT GAIN COEFFICIENT'
South -facing
--------- 0.40 MR0,40 NR440
Wtst-fudnQ g(QzIng --------- 1140 --------- 0.40 0,40 0.40
--------- NR
40
rosi-foc" Glazing
Gtazl"o --------- NR --------- NR MR0,40 NR.40
TWRMAL MASS' REG --------- MR REG NR
INFILTRATION C04TRUL -- - ----- NR
Contihous harrier
Air to air heat exchanger -- — ---- - - ------ NR
SPACE -HEATING SYST&
allowed ------- - NO Yes 7 NO
If Gas, AFUE= --------- 78Y. 78z MIN
M14
SInGto
system 14SPFft --------- 64 --------- MIN
SpACE-COMING SYSTEM
it split system AIC, SER's - 1040 Yes 7 Nil
Refrigerant charge and
REG REQ*
measurement or, Thermostatic
expansion valve
If single package A/C, SEER --------- 9.7, --------- 917 "IN
SPACE CONDITIONING DWTS
Duct seatft REG
DOMESTIC WATER -HEATING TYPE
System mist meet budget, see --------- Any --------- Any An)
Any
Section 151 (b) I and (f) 98
*As An alternative under Package I, 9taZini;
46 timum, 0.40 U-f4ctor and maximum M35 Sc tar Neat
Gain Coof Fident can be substituted for tbAct sooting i nd either refrigerant charge and Qlrf Ow
measurement or, a thermostatic oxpxnslon valve, All Otter ro, . ciulrenonts 01
D must b! not -
system must meet budget, $00
Section J
1 (b) i and (f) 98
Logendl
NR Not Required NA Not 4 pkicable
REG
KIN Mlmliotut
See not#ts following Table I-ZI6, _I I
MANDATORY MEASUWS CHECKLIST, RESIDENTIAL (Page, I Of 2) Mr-IR
Note, Lowrlso rvskJvn*Io:t buftdin(,s
reg
asterisk (0) may be
supersedotl by more str
on the CertlflcQte of ComPtionco'
be
considered by all
as mIr" compontrit performance specifications for th : e mandatory-1
measures whether they are shevr, elsevshere in the documents or on this checklist only.
InstructIonst'Check or
ap.,)(Icobte boxes when completed or enter N/A If not applicable,
DOCORIPTIM IGWR EWMWNT_
BUILDING WYgLO-PE _WASYA_Et-
',a)# 4nkvm R-19 �
exkv Insulation,
150(b)t N/A
9 15iXcN Nnk" R-13 "it ln"atjon in
ss watts), R-13
150(d> - - In framed
N1
JSXI>
#do* 16OU44100 - W4*jw ObsOrP410n,"t" no ar-#4tiiw ihan 113Y, WA
water
ties Insm(otion spedfled or Installed meets insutotion quality SUnd4rds. lnft*+,e BATHS
t&! and
116-171 Fenestration Product#, 0,49rior Do*,s, and 1nfAtr6*lOn/EXf1*r4tIOn
A
t. DqmX and eindows b#t~ CtX1d+joned and unconditioned "cos designod P
to
ok, took4gv. P
a, Fgnes+ L
,r%Vvm
Y* toblitt with cortifled
U-
rtified Solalk Hoot CiAin Coefficient (SHM), and Infiltration
E
3. Exterior doors
othorstrlppedi all joints and penetrations S
orAtAked and seated
I
16 ontv� N/A
IMfN Spedoi Inflitr4tion barrier installed to cOVtY with I
meet* N/A
Commission
A
1
GAS APOUIA"cts and Gas Lao, P
1
fireplaces hovel P
a. Ckosellbiq
or glass door L
. Wigide Qlr, Intake with damper and cont*'Ok I'
c. Flue damper and control E
Z No
ontinuous burning 049 P10t lights 400ve(k S
SPACE CONOnla", WATER W.ATM AQ PLU149M SYSTEM MEASURESt
110-§ 1131 HVAC
water heaters, showerheads and faucets cortifled
INCLUDE
by the Commission
and/or cooling 104ft calculated In accordance with ASHRAE, INCLUDE
SMACNA, or ACCA
IWI)t
thormOStAt On kit APPOMMO 11004119 and/or, Cooling $"%*As, INCLUDE
150(j)t pipe and tank insulation
1. Storage gas water heaters rated
9 A
must be
with InsutoAlon h*vN an installed thermal
resistance of R-te or'Creater. P
heater Aw44 non-rockcAAe" P
systoftsA kmA4t*d (9-4 or aroatliwl)
3, Back-up tanks for XO14r SYS19",
or other Indirect L
hot water tanks
R-18 external instAotion or R-16 co#61nod Internal/
external, insulatiom
4, Alt buried or exposed plift Irt"atiOn in r#CjrCAA*tWV sections of hot water E
systems. S
6,
insulated between hooting source and Indrect hot water tank.
Compli
nce Form
Page
144 2001 BulldlnQ Energy Standards
PACKAGES FOR CLIMATE ZONES
2.
Ballow -grade watts ---------- 0A ...,__..,._.._NA
.;"...,.,...,....NR
0.
Ma• Liq ximum total area ---- - ..,._NR
glazing
_..__...,.._..Nit 0.40 O.
North -felting
..,.....,._.,.._NR
Electric -resistant
If heat Pump, sput system HSPF-*-- ---- 6A ,....,...»«_..«.6.8 6,8
package
airflow
REQse
e
with
Packager
5
Required
•
Y f;
subject to the Standards must contain the se measures
ardless of the compliance approach used,'Items marked with an
ingent comptlame reqArementz listed
When this checklist to Incorporated Into the permit document*, the features noted shalt
parties
Initial
aK
c
wood framed walls or t(*AftWn* U-r4ctOy-
in metal fromot* idols no+ ur4Ay to exterior "a
,doors,
Stab
vapor transmission rate no greater than ZO perm/inch.
tint
Products (except field -fabricated) hn 12-13 raised Floor Insulation farrsb
Contras, .
o
Factor, ce
and Windows ec.
50<0 Vaoor mandator in Climate Zones 14 and
151
.standards,
80Ce), Installation of Fireplaces, Decorative
, 14asonry and ftctory-built
meat
b
c
equipment,
. -------
150(h)j Heating
Setback
with an Energy Factor toss than O.5
externally wrapped
E. F"113 feet- 6f 0001 Close" to water
unfired ~400 tanks,
have
S. Cooling systems PON below 55! r Insutotod.
Piping
a
011111111
AR . CHITECTURAL DRAFTING
SERVICES
PROJECT
Residence
CONTRACTOR
Name,
Address,
Cityl
S-t-atel
Zip Codei
License #1
Bond #1
Insurance #I
PROJECT NUMBER
0 00 -
DATE
REVISION
DATE
REVISED BYI
#1
SHEET TITLE
REVISION
TITLE 24
SHEET
MANDATORY MEASUWS CHECKLIST, RESIDENTIAL (Page, I Of 2) Mr-IR
Note, Lowrlso rvskJvn*Io:t buftdin(,s
reg
asterisk (0) may be
supersedotl by more str
on the CertlflcQte of ComPtionco'
be
considered by all
as mIr" compontrit performance specifications for th : e mandatory-1
measures whether they are shevr, elsevshere in the documents or on this checklist only.
InstructIonst'Check or
ap.,)(Icobte boxes when completed or enter N/A If not applicable,
DOCORIPTIM IGWR EWMWNT_
BUILDING WYgLO-PE _WASYA_Et-
',a)# 4nkvm R-19 �
exkv Insulation,
150(b)t N/A
9 15iXcN Nnk" R-13 "it ln"atjon in
ss watts), R-13
150(d> - - In framed
N1
JSXI>
#do* 16OU44100 - W4*jw ObsOrP410n,"t" no ar-#4tiiw ihan 113Y, WA
water
ties Insm(otion spedfled or Installed meets insutotion quality SUnd4rds. lnft*+,e BATHS
t&! and
116-171 Fenestration Product#, 0,49rior Do*,s, and 1nfAtr6*lOn/EXf1*r4tIOn
A
t. DqmX and eindows b#t~ CtX1d+joned and unconditioned "cos designod P
to
ok, took4gv. P
a, Fgnes+ L
,r%Vvm
Y* toblitt with cortifled
U-
rtified Solalk Hoot CiAin Coefficient (SHM), and Infiltration
E
3. Exterior doors
othorstrlppedi all joints and penetrations S
orAtAked and seated
I
16 ontv� N/A
IMfN Spedoi Inflitr4tion barrier installed to cOVtY with I
meet* N/A
Commission
A
1
GAS APOUIA"cts and Gas Lao, P
1
fireplaces hovel P
a. Ckosellbiq
or glass door L
. Wigide Qlr, Intake with damper and cont*'Ok I'
c. Flue damper and control E
Z No
ontinuous burning 049 P10t lights 400ve(k S
SPACE CONOnla", WATER W.ATM AQ PLU149M SYSTEM MEASURESt
110-§ 1131 HVAC
water heaters, showerheads and faucets cortifled
INCLUDE
by the Commission
and/or cooling 104ft calculated In accordance with ASHRAE, INCLUDE
SMACNA, or ACCA
IWI)t
thormOStAt On kit APPOMMO 11004119 and/or, Cooling $"%*As, INCLUDE
150(j)t pipe and tank insulation
1. Storage gas water heaters rated
9 A
must be
with InsutoAlon h*vN an installed thermal
resistance of R-te or'Creater. P
heater Aw44 non-rockcAAe" P
systoftsA kmA4t*d (9-4 or aroatliwl)
3, Back-up tanks for XO14r SYS19",
or other Indirect L
hot water tanks
R-18 external instAotion or R-16 co#61nod Internal/
external, insulatiom
4, Alt buried or exposed plift Irt"atiOn in r#CjrCAA*tWV sections of hot water E
systems. S
6,
insulated between hooting source and Indrect hot water tank.
Compli
nce Form
Page
144 2001 BulldlnQ Energy Standards
PACKAGES FOR CLIMATE ZONES
2.
Ballow -grade watts ---------- 0A ...,__..,._.._NA
.;"...,.,...,....NR
0.
Ma• Liq ximum total area ---- - ..,._NR
glazing
_..__...,.._..Nit 0.40 O.
North -felting
..,.....,._.,.._NR
Electric -resistant
If heat Pump, sput system HSPF-*-- ---- 6A ,....,...»«_..«.6.8 6,8
package
airflow
REQse
e
with
Packager
5
Required
•
Y f;
subject to the Standards must contain the se measures
ardless of the compliance approach used,'Items marked with an
ingent comptlame reqArementz listed
When this checklist to Incorporated Into the permit document*, the features noted shalt
parties
Initial
aK
c
wood framed walls or t(*AftWn* U-r4ctOy-
in metal fromot* idols no+ ur4Ay to exterior "a
,doors,
Stab
vapor transmission rate no greater than ZO perm/inch.
tint
Products (except field -fabricated) hn 12-13 raised Floor Insulation farrsb
Contras, .
o
Factor, ce
and Windows ec.
50<0 Vaoor mandator in Climate Zones 14 and
151
.standards,
80Ce), Installation of Fireplaces, Decorative
, 14asonry and ftctory-built
meat
b
c
equipment,
. -------
150(h)j Heating
Setback
with an Energy Factor toss than O.5
externally wrapped
E. F"113 feet- 6f 0001 Close" to water
unfired ~400 tanks,
have
S. Cooling systems PON below 55! r Insutotod.
Piping
a
011111111
AR . CHITECTURAL DRAFTING
SERVICES
PROJECT
Residence
CONTRACTOR
Name,
Address,
Cityl
S-t-atel
Zip Codei
License #1
Bond #1
Insurance #I
PROJECT NUMBER
0 00 -
DATE
REVISION
DATE
REVISED BYI
#1
SHEET TITLE
REVISION
TITLE 24
SHEET
subject to the Standards must contain the se measures
ardless of the compliance approach used,'Items marked with an
ingent comptlame reqArementz listed
When this checklist to Incorporated Into the permit document*, the features noted shalt
parties
Initial
aK
c
wood framed walls or t(*AftWn* U-r4ctOy-
in metal fromot* idols no+ ur4Ay to exterior "a
,doors,
Stab
vapor transmission rate no greater than ZO perm/inch.
tint
Products (except field -fabricated) hn 12-13 raised Floor Insulation farrsb
Contras, .
o
Factor, ce
and Windows ec.
50<0 Vaoor mandator in Climate Zones 14 and
151
.standards,
80Ce), Installation of Fireplaces, Decorative
, 14asonry and ftctory-built
meat
b
c
equipment,
. -------
150(h)j Heating
Setback
with an Energy Factor toss than O.5
externally wrapped
E. F"113 feet- 6f 0001 Close" to water
unfired ~400 tanks,
have
S. Cooling systems PON below 55! r Insutotod.
Piping
a
011111111
AR . CHITECTURAL DRAFTING
SERVICES
PROJECT
Residence
CONTRACTOR
Name,
Address,
Cityl
S-t-atel
Zip Codei
License #1
Bond #1
Insurance #I
PROJECT NUMBER
0 00 -
DATE
REVISION
DATE
REVISED BYI
#1
SHEET TITLE
REVISION
TITLE 24
SHEET
011111111
AR . CHITECTURAL DRAFTING
SERVICES
PROJECT
Residence
CONTRACTOR
Name,
Address,
Cityl
S-t-atel
Zip Codei
License #1
Bond #1
Insurance #I
PROJECT NUMBER
0 00 -
DATE
REVISION
DATE
REVISED BYI
#1
SHEET TITLE
REVISION
TITLE 24
SHEET