Loading...
HomeMy WebLinkAbout10147979.pdfGENERAL 1. All material and workmanship shall conform to the drawing and specifications. 2. During the construction period, the contractor shall be responsible for the safety of the building. The contractor shall provide adequate shoring, bracing and guys in accordance with all national, state, and local safety provisions and must be approved prior to erection. 3. Drawing indicate general and typical details of construction where conditions are not specifically indicated but are of similar character to details shown, similar details of construction shall be used subject to review by the architect. 4. All details designated as standard or typical shall occur in addition to any other specific called out. 5. Grade and species of all lumber must be grade marked. 6. Light and Ventilation. Min. of 15 CFM of outside air per occupant is required for ventilation. FRAMING LUMBER 1. All structual lumber shall be Douglas fir, #1 or #2 conforming to standard framing rules for West Coast. 2. Plywood for roof sheathing shall be CDX, Unless noted otherwise. Use exterior type, minimum C-C grade, where plywood is exposed to weather. Plywood for floor sheathing shall be CDX, unless noted otherwise. All plywood shall conform to US standard PS 1-95. 3. All wood bearing on concrete shall be pressure treated or foundation redwood. 4. Studs over 10 ft. in height or supporting 2 floors and roof must be 2x6's at 16" OC unless noted otherwise. For studs greater than 16 ft., see plan. Studs in cripple walls less than 4 ft. in height may match the studs above. 5. Provide 2x's solid blocking between joists and rafters at all supporters. 6. Cross bridging shall be provided at 8'-0" on center maximum for all joists and rafters more than 8" deep. 7. Provide double joists under partitions which are parallel to the joists. 8. Top plate of all studs walls shall be two pieces the same size as the studs. Splices are to lap 4'-0" minimum and be nailed with 16d nails min. each side of joists. 9. All nails shall be common or gal. box. Nailing shall be per chapter 23 of the uniform building code. 10. All bolts shall be retightened prior to the applications of sheathing, plaster, etc. 11. Use 2x6 for plumbing walls. REINFORCING STEEL 1. All reinforcing steel, dowels, and ties shall conform to ASTM A615, grade 60, unless noted otherwise. #3 bars shall be ASTM A615, grade 40, deformations shall be in accordance with ASTM A-305. 2. All reinforcing steel shall be lapped as indicated on the drawings where laps and/or splice locations are not specifically indicated, verify with the engineer if a splice can be provided. All reinforcing steel shall lapped with a class "C" lap unless noted otherwise. 3. All reinforcing steel in masonry shall be lapped 40 bar dia. or two (2) feet min., unless noted otherwise. ,Jill 11" is lk 1 PROPERTY ADDRESS - 1101 BEWLEY ST.SANTA ANA, CA 92703 2 PROPERTY OWNER - EFRAIN SALGADO 3 PROPOSED: TWO BEDROOMS, ONE BATHROOM 4 TYPE S.F.RESIDENCE- ZONE - RI 5 PARCEL: # 198-102-26 6 LOT AREA 7500 Sq.Ft. 7 EXISITING LIVING AREA- 1098.2 Sq.Ft. 8 ADDITIONAL LIVING AREA- 684.15 Sq.Ft. 9 NEW LIVING AREA- 1782.35 Sq.Ft. 10 LOT COVERAGE 26.7% 11 YEAR BUILT 1954 -f Hose Bibb ® Window -(D Lighting =E�= GFCI Outlet -& Arc -Fault Outlet � Switch Smoke Detector w/ Battery Back Up O New 4040 Sliding Window W/ Dual Glaze W/ 46 Hdr. O New 2668 Door W/ 4x4 Hdr. O New 3030 Obscure Window W/ 44 Hdr. PExt. Gas Meter A H Attic Access Min. 22"X30" 2.1c9 -05 �.� [t x1 Y 5f , S v " " S f 5, � TH 5f , ,ti��',�s pT FOR ,C z P EE PF r4 5 �� .LE&�1CAL, FLUB: , t � ^ E T4iss gat et Pyans s �r� � ns n, ussl bO tf . 01. t -11 Ell ti�3s afld ii is rai r t�era nmr ss � trr asthe ���qq'ij�S¢m9yt'a1�a�}s�� yy.�iee`�T�P �(f�� SJ� R✓&.a8CL9 �07&]. The aW)Pla c� p is plan artdrs �i f °�I;Es 1 arty i ri .0 ��q, h� an ai i� K Ja b het -0 Law. _ _ ^s . r ks Age.n of Ora nge Health lth De�ba;"�nr n F � A ��/ yP ,//am L ANT NIK_ 1>1 (714, 5, 7-27 00 C? C_ SITS PLAN SCALE: 1 /8"= 0 CY) C) CN U m .o a No. Revision/Issue Date Owner. EFRAIN SALGADO 1101 BEWLEY ST. SANTA ANA CA, 92703 Project Planner: R.A.M BUILDING AND DESIGN 1123 S. ROSEWOOD SANTA ANA, CA 92707 sheet Title: 'Sheet SITE PLAN Date 12/07/2004 Scale A�l AS NOTED E, 8X2 C5 Wind, fo —� �e 12emoved and C:eplaced With 4' -01' X4' -01' C/ual 61aze 51idinq Windo, w/ 4X6 Ndr, �, 3X3 Nunq Window fo 3e P\emoved and II With 3' -0" 0' -0" Pual Glaze 51dnq Windo. w/ 4X6 Ndr, �. 4X2 Nunq Window fo 13e I'.emoved and replaced With 4' -0" X4' -0" IPA 610ze 51idinq Wind w/ ,4X6 Ndr. �' 9X2 C5, Wind, fo 5e Removed and replaced With 4' -0" X4' -0" pual 61 aze 51idinq Windo, w/ 4X6 Ndr, �. 12X2 C,5, Window fo 6e removed and Replaced Wtth 6X412UA 61aze 5lidinq Wind, w/ 4X6 Ndr. FLOOR PLAN (EXT AND A-5 New 4' -0'' M' -0'' Pual Glaze 51id inq Windo, w/ 4X6 H& i New -_� 1 -0'' 0' -0'' Dual Glaze 510inq Windo, w/ 4X6 H& \ New 4' -0 1, X4' -0'' Pual Glaze 510inq Wind, w/ ,4X6 Hdr, \ E. 3X2 C,5, Wind, fo 6e Pemwed and peplaced With 3' -O'' X2' -O" bual 61aze 51idinq Wind, w/ 4X6 Ndr. 3668 Pox I �, 4X2 C5, Wind, fo Cie pemoved and C Cpked With 3' -01' 0' -01' Pual Glaze �A, 4X2 C5, Wind, 5lidinq Wind, w/ 4X6 Ndr, fo Cie 12emaved ADDITION) SCALE: 1/8"=1'-0" E, 3X2 C,5, Wind, fo Pe I'emwed and Feplaced With 3' -O"X2' -0" pual Glaze 51idirq Wind w/ 4X6 Ndr, �. 6X2 C5 Wind, fo Cie kemaved and Peplaced With ( 2) 3' -0"X2' -0' 1 PUal Glaze 51hdinq Wind. w/ 4X6 Nor, �. 30 C,5, Wind, fo Cie Kemoved and Pcoaced With 3' -01' 0' -01' Pual Glaze 51idinq Wind, w/ 4X6 Ndr. 13'-10" 3' -0'' X6' -0" bandirlq For 5lidinq boor 5offi-�-5ee de�ail5 W �A� 15 NSW WOOM Hose C ibb W/ backflu5h �xf' 1�moom r r i ■ W, M-It?OOM AF A� New 5068 510inq boor A� W/ 40 Hdr, �Ar NSW P�,bK00M CY) i AF i (ID\ � O — A.A. V AF 27 , N ACC�55 � , � fireplace �Xf' r MlooM New 4' -0'' M, -0'' Pual Glaze 5l id inq Windo, w/ 4X6 H& FLOOR PLAN > Covered Walkway �_- ---New �' -01 X2' �0 ' 1 pual Glaze Sliding Wind. I w/ 4X6 Hdr, NSW C M'O0M W, DIVING PDOM 0 New 6X4 Window w/ Pual Glaze w/ 4X6 Hdr, MA I O Ln r 3 68 boor SCALE: i boor 0 ' r New �' -0" X2' -0" bual Glaze 51 id inq Wind, w/ 4X6 Hdr, New ( 2) 3' -O'' X2' -O' Pual Glaze 9id inq Wind, �X1", KI�CH�N — w/ 4X6 Hdr, 1 /4"=1 ' —0" New �' -0 1, 0' -0' 1 Pual Glaze 9 id inq Wind' w/ 4X6 H& New '_�' -0' 1 X3' -01' Pual Glaze 51 id inq Wind , w/ 4X6 Hdr, I ()I q1 q I q No. I B Revision/Issue I Date ANGELICA SALGADO 1101 S. BEWLEY ST. SANTA ANA CA, 92703 Project Planner. R.A.M BUILDING AND DESIGN 1123 S. ROSEWOOD SANTA ANA, CA 92707 Sheet Title: Sheet FLOOR PLAN Date 11 /01104 A��2 Scale AS NOTED ROOF 1 1 '-6 New Roof, New sh ingle Cl ass '' C'I to march �xAinq Now O � N � � II M �xisiinq bweinq �xis�inq bwelinq NEW ADDITION WEST ELEVATION SCALE: 1 /4"=1 '-0" NEW ADDITION i FINISH FLOOR 090 EVERY ONE AIR VENT PER MIN. AIR VENT 6X1 1 No. I B Revision/Issue I Date ANGELICA SALGADO 1101 S. BEWLEY ST. SANTA ANA CA, 92703 R.A.M BUILDING AND DESIGN 1123 S. ROSEWOOD SANTA ANA, CA 92707 L Sheet N EAST & WEST 1/01/04 _ a NOTED �I NEW ROOF 107-3" IMMI-11MINOM NEW 1V— New Roof ' New Asphalt Shingle Class I I CI I to match xl5tlnq New I:oof, New Ap5kalt shingle Class I' C'' to match �Ki5tinq New Stucco to co Match existing � ROOF " FM — 10 1-011 ew Attic Vent New Attic �XI%NG New I:oof, New Vent Aspahlt shingle CI ass I4X24 I I CI I to match �xi5tinq 12 �3 NEW ADDITION NORTH ELEVATION SCALE: 1 ��„— I ,—o„ A galioo ~� Q T; f €. /i 12 —13 III❑��'�� I'�C ® < < 8" Overhang New Roof, New Asphalt Shingle Class I I C'' to match Ee x, Walkw IV'EW ADDITION — SOUTH ELEVATION FINISH FLOOR 0'0 PLANNIM MVISKON DiSCsti. ACTION TYr,': KAMINEikl DATE:---, CONTACT' PHONE (7I4) 567-2:700 SUP? r-, nn rt-wn rr s7- New Garage Roof --------------- -------------- I I 12 LF — — — — — — — — — — — — — — — — — — — — --- ------T-J __J I 2 New Garage f?oof Changed from I I 121 � fo 1212, I I I I I I I I I C New nwel I inq j �xi5tinq Behind �xt, I Garage Garage) CY 0 0 0 ! FINISH FLOOR �W Itlon ---J 090 � it Y _., � . _ '■R 0 a,. V m 0 No. I C Revision/Issue I Date Owner. ANGELICA SALGADO 1101 S. BEWLEY ST. SANTA ANA CA, 92703 Project Planner. 5! l; BUILDING 1123 S. ROSEWOOD SHEARWALL SCHEDULE No SCALE 7 5NWWW.1. SCN�bl� 5Hr- 1VN6 U5� 3/ 8PUYWOOP Op 0513 �P6� NAIUING 8b @6" FEILP NAIUING 8b @I2'' �Pb� 5tP AT PILK A , 3x 51LL 1 01L?6 @ 5 / 8 ab @ 4' -O" �OUNPMON 5/ 8 ab @ 2' -O" 51LL NAILING @ UPP�p 16P @ 6" 51"or` 5 -16P @ 3" 5HM, ALLOW 264PLF *- 528PUP 5HM ALLOW W/ 224PLF 157, P�bUCTION *-448PLF I =1'AI-1 n„ A L=2°-4" 17 B L= 1 1-711 17 L.=131 6- CIELING JOIST PLAN FOR ADDITIQJ SCALE: 1 /4"=1 '-0" No. i A Revision/Issue I Date ANGELICA SALGADO 1101 S. BEWLEY ST. SANTA ANA CA, 92703 Project Planner. R.A.M BUILDING AND DESIGN 1123 S. ROSEWOOD SANTA ANA, CA 92707 F Sheet 7 RAMING 1/01/04 A�4 Scale AS NOTED /- t' /--) A — --f- /-� /-) /- ( �) l 6 � @ 036 PURLIN CONNECTION DETAIL Fberqlass sly inqle J655 '' C ' or bet-,r over( �) laqor of � Feltover / 2'' rr)V Ini, I%All')I')A 1(-) 1 ") AI it k1l 2M (earrirq Wa NO SCALE fter5 @6'' UC, 2X4 Contiriuo5, W1 4-116J @ each 2X4 Purlin �oarinq Wall /-7 V 0 6 - f) - - ---) I /-' I I '/-) /- 2X6 Ld @ # 2X8 13bckincl N3115 2X8 Fascia W/ P\J� In5l, RAFTER CONNECTION DETAIL NO SCALE NEW ROOF PLAN FOR ENTIRE HOUSE No. I A Revision/Issue ANGELICA SALGADO 1101 S. BEWLEY ST. SANTA ANA CA, 92703 pl-j--t -PI-7-1. R.A.M BUILDING AND DESIGN 1123 S. ROSEWOOD SANTA ANA, CA 92707 Date Sheet heet Title: Sheet FRAIMV ING DETAIL Date 1/01/04 A�5 Scale AS NOTED NIS 2X8 Fascia 2X4 5tuJ5 @ 6 O L , w, r'J � 61. Ho olown Anchor @ each 5ic 2X8 F asc is 2X4 5buJ5 @ 6 O L , w, ns k Ho Jown Anchor @ each % SECTION FRAMING EAST (A) SCALE: NO SCALE I / '-'l 11 /\ /' i ) /' I . 1 �"6"12" f�laiinq SECTION FRAMING NORTH (B) SCALE: NO SCALE ,r @ 161, 0,C' 2X ockinq Plate M46 No. I A Revision/Issue Owner. ANGELICA SALGADO 1101 S. BEWLEY ST. SANTA ANA CA, 92703 Project Planner. R.A.M BUILDING AND DESIGN 1123 S. ROSEWOOD SANTA ANA, CA 92707 Date F Sheet RAMING DETAIL 2/17/04 A�J6 AS NOTED F , Foobrq r I I I I 1I ppII I I In I/ I,,, I n, ,,I I A � ,- NEW FOOTING ANEXISTING FOOTING 13'-10" .11 SCALE: (NO SCALE) FLOOR JOIST PLAN SCALE: 3/16"=1 '-0" 2X O l ockinq f� pe 2X6 Bottom date b,F, #2 Min, Z II Bowe 6II W/ 600 lr& O'C' 2X8 PLOOP J015T @ 16 O.C, W/ �-�O IN5 20 P,T. PLAT> W/ 5 / 8"xl2'' AD, — 9 12" oe 2x6 freateol 511 w/ 5/ 81'x 2'' A5, @ 611 0L, ark 2'' Max from �nJ5 New � Floor fo Match �KA!n Floor hove �xistinq oor / I I I I ( 2) # 4 Febar f, & I , IAI I,II - - - - - - - - - - - - --- ry, �xistinq 5ub door I °I M I 1=1 11=11 N I 11= NEW FOOTING TO EXISTING FOOTING Sc<.LE. rwo scnLr; 3/ �" PLOOP 5 EATNIN6 W-6-6-IZ 2-20 r,LOMN6 TYPE 4X6 C41MF 4X4 COPPL� P05T W/ 2- <v5F TO 61t:fi P A-3> @ MH 5I7c coNcTl PIEI; O � r GIRDER DETAIL SCALE: (NO SCALE) 13'-10" I, FOUNDAT191 PLAN NOTES 1. Safety glazing is required at wardrobe door, tube enlcosure, and shower enclosure. 2. Use type V cement with a minimum strength of 2500 psi @ 28 days. 3. Steel reinforcement shall be grade 40, deformed. 4. Showers shall be finished 70" above drain w/ surface material not adversely effected by moisture. 5. Provide double top plate W/ min. 48" lap of splices. 6. Provide Min. 12"X6" Wire Screen for Under Floor Ventelation @ 5'-0" 0C SCALE: 3/16"=1 '-0" H O No. I A Revision/Issue Owner. ANGELICA SALGADO 1101 S. BEWLEY ST. SANTA ANA CA, 92703 Project Planner. R.A.M BUILDING AND DESIGN 1123 S. ROSEWOOD SANTA ANA, CA 92707 Date heet Title: Sheet FOUNDATION ate F 12/17/04 A�J�7 AS NOTED L New goof, New \f---7"ARAGE— SOUTH ELEVATION SCALE: 1 //4"== 1 '-0" GARAGE —NORTH ELEVATION SCALE: 1/4p)= 1 _0,. 2X6 (?after @ 16'' 0,C, �Ktq. 2X4 CJ @16 OC ry,o, trouble 2M fop Plate 5-16J Nails 2X6 Nockinq W1 5-16J N3115 M Fascia �Ko2X4 5tuJ5 @16 O'C' RAFTER CONNECTION DETAIL SCALE: (NO SCALE) New 2Y6 PP, @ 16 OC New 2X6 kk @ 16 OC O Now 2X8 k0cle team cv - ROOF PLAN SCALE: 1/4"= 1 0" Now Asphalt Fiber alas 5krde d,55 "C" Now 1'.00f. Now ri— GARAGE—WEST ELEVATION SCALE: 1 /411= 1 '—Oyl New Roof, New A-1—b- ri--- GARAGE—EAST ELEVATION SECTION FRAMING SCALE: north) SCALE: (NO SCALE) 5f, 24 @ �2 0,C, New 2X4 Trust ( 3) 16 J @ each gaffer 2X4 Continuos W1 4-16d 1/41)= 1 7-0" New Asphalt Fiber glass shingle class ''C' or better over ( I) layer of #I 5 Felt over 1/ 2 '' C12X plywood or OSO ( 6,6.12 mallinq) I 2X8 ridge 13J, New 26 {'afters @16" 0.C' �Y,bq 20 Cd @16'' Of. PURLIN CONNECTION DETAIL SCALE: (NO SCALE) New 2X4 Continuo-, W/ 4-16d No. I B Revision/Issue I Date Owner. EFRAIN SALGADO 1101 S. BEWLEY ST. SANTA ANA CA, 92703 Project Planner. R.A.M BUILDING AND DESIGN 1123 S. ROSEWOOD SANTA ANA, CA 92707 SCALE: (NO SCALE) Certificate of 01)r _ llance. Residential _dart SALGADO RESIDENCE - - -____ - ---2/10/2005 Project Title Date 1101 Bewlev Street Sa Ana Project Address Building Permit # - I Western Engineering714 491-0786 - - - _ _.._._.__._ (_-_) PlanChecklDate Documentation Author Telephone Ce_mputer Performance _--_ -----_-$ _----.-_-. Field Check / Date Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only GENERAL INFORMATION Total Conditioned Floor Area: ------ _1_,78-2- ft2 Average Ceiling Height:. ft Total Conditioned Slab Area: . _1,782.ft2 Building Type: (check one or more) X) Single Family Detached !Addition Single Family Attached Existing Building _ l Multi -Family X. Existing Plus Addition Front Orientation:._. __._.. _ Eas�._90 deg. Floor Construction Type Xi Slab Floor Number of Dwelling Units: Number of Stories: J Raised Floor INSULATION �BUILDING.SHELL Const. Component Frame Assembly Location/Comments Type Type U-Value (attic, garage, typical, etc,) Default Floor Prior 1 o 1991 nja 0.756 Covered Slab w/R-0.0 Perimeter Insulation . 1 Default Wall Prior to 1978 - -_. Wood 0_385 Exterior Wall Default Roof Prior to 1978 _.. Wood 0.047 Exterior Roof _ Unlnsulated Raised Slab Floor - n/a 0.756 Covered Slab w/R-0.0_Perimeter Insulation _ - R-19 Wall (W 19.2x6.16).. _Wood 0.065 Exterior Wall_-__ i R-30 2x4.24 R f R o. - _--o ._(._ 30 ) Wood - 0.031 Exterior Roof -- .. FENESTRATION -- Shadinq Devices (Type Orientation Area --� Fenestration _ Exterior Overhang Side Fins l SF -Factor SHQC Shading Yes / No Yes / No Front _--.(East) __ _58.0- ------1.28-- _--0.80 __. _ _._ Bug -Screen-_-_ [_1 iX Left_---jSouth) -41.0 - 1.28 --_- 0.80 --- ----- Bu_.g Screen + ! i [X� [_ � 1 I X l, i Right - --(North) 33.0 --- 1.28 0.80----- - - -- Bug.ScreenI X Left -------(South) _ --- -9.0 - 0.87 _-.- -0=70 -. --Bug Screen I I X� 49.0 0.87- -- 0.70 -- - Bu Screen 0 rX I El f X l; Right- jNortl _ 16_0 --- 0.87 ---. 0.70- - - -Bug Screen- - L u 7 Ci -- - - -- - ---- - --- -- - - ❑ i� LJ L-' L_ __.-_---_-_.-- Runlr'iationTime: 1�1/0421:2�:15---__R�in�Lde_]Z4?$2__917� -. _.--------._-J EnergyPro 3.1 By Enery�rSott_____ User Number: 5616 Job Number: 0001 Pa e:3 of 13 Certificate of Cow iia C o 2 nti i (Part 2 of 2) SALGADO RESIDENCE _ - Project Title Date HVAC SYSTEMS Note: Input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load. Distribution Equipment HeatingType Minimum and Duct or Type (furnace, heat Efficiency Location Piping Thermostat Location / pump, etc.) (AFUE/HSPF) (ducts, attic, etc.) R-Value Type Comments antral FnttlaCa..--_ _ __-- _ 80% AFUE tba .k _ - ____ HVAC System Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc.) R-Value Type Comments Split Air Conditioner__--_____ 10.0 SEER_ Ducts in Attitt _2 i- __. Setback - HVAc svcram___.__ _ WATER HEATING SYSTEMS Rated 1 Tank Energy Fact! 1 External Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby Tank Insul. System Name Type Type S st. Btu/hr al Efficient Loss % R-Value - - - - _ - .. - -- - - - ----- --- .. --- - ----- 1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input and Recovery Efficiency. REMARKS - -- ---- I I i COMPLIANCE STATEMENT --------------- ----- ----- ---- --- This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification and field verification by an approved HERS rater. Designer or ner (per Business & Professions Code) Documentation Author Name: Name: - ------------------- ---- Syed Ahmed--- Title/Firm: R.A.M BuildingDesign Title/Firm: Western Engineering Address: 1123 S. Rosewood Address: 1237 S. Euclid St., Suite G _ _Santa Ana CA 92702--- -_-__- Anaheim, CA 92802 -_ u Telephone' 14-54.0-3530 Telephone: I714j_491-o786_ LIc. i#: (sig re j (date) (signature) - _ (date) ) Enforc nt Agency Name: Title/Firm: Address: Telephone__ - --- -(signature/stamp) -' ---- - (gate) EnergyPro 3.1 By EnergySoft _ User Number: 5616 Job Number: 0001 Page:4 of 13 Mandatory MeasuresChecklist: Residential (Page 1 of 2) - NOTE: _ow rise residential buildings subject to the Standards must contain these measures regardless of the compliance app,oach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by ail parties as minimum component performance specificaLons for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. pp pp DESCRIPTION Instructions: Cheek or initial applicable boxes or enter N/A if not applicable, DESIGNER ENFORCEMENT Building Envelope Measures X *§ 150(a): Minimum R-19 ceiling insulation. X §I60(b): Loose fill insulation manufacturer's labeled R-Value. *§ 150(cy Minimum R-13 wall insulation in wood framed walls or equivalent U-value in metal frame walls (does Xnot apply to exterior mass walls) X *§150(d): Minimum R-13 raised floor insulation in framed floors or equivalent. § 150l): Slab edge insulation - water absorption rate no greater than 0.3%. water vapor transmission rate no greater than 2 0 perm -inch. X § 118: Insulation specified or installed meets insulation quality standards. Indicate type and form. X § 116-17: Fenestration Products, Exterior Doors and InfiltrationtEAltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration products (except field fabricated) have label with certified U-Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. 3. Exterior doors and windows weatherstripped: all joints and penetrations caulked and sealed. § 150(g) Vapor barriers mandatory in Climate Zones 14 and 16 only. § 150(f): Special infiltration barrier installed to comply with Section 151 meets Commission quality standards. XI .. § 150(e): installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allowed. Space Condition in , Water Heating and Plumbing System Mlewasures X § 110-13: HVAC equipment, water heaters, showerheads and faucets certified by the X § 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNv X § 1506) Setback thermostat on all applirable heating and/or cooling systems. X §1500). Pipe and Tank Insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R-12 or greater. 2. First 5 feet of pipes closest to water neater tank, non-;ecirculating systems, insulated (R-4 or greater) 3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 combined internal/external insulation. 4. All buried or exposed piping insulated in recirculating sections of hot water systems. 5. Cooling system piping below 55 degrees F. insulated. 6. Piping insulating between heating source and indirect hot water tank. ;EnergyPro 3.1 By EnergySoft User Number: 5616 Job Number. G,: Page.5 of 13 --Mandatory MeasuresChecklist: Residentiall (Page 2 or 2) RAF-1 R NOTE: Lownse residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Iternb rnarked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specrfcations for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION Instructions: Check or initial applicable boxes or enter N/A if not applicable. DESIGNER ENFORCEMENT Space Conditioning, Water Heating and Plumbing System Measures (continued) X_; *§ 150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601, 603, 604 and Standard 6-3. ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system that meets the applicable requirements of UL181, UL181A, or UL181 B. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be seated with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than seated sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross -sectional area of the ducts. 3. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such a tape is used in combination with mastic and drawbands. 4. Exhaust fan systems have back draft or automatic dampers. 5. Gravity ventilation systems serving conditioned space have eitherautomatic or readily accessible. manually operated dampers. 6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. I § 114: Pool and Spa Heating Systems and Equipment 1. Certified with 78°i thermal efficiency, on -off switch, weatherproof operating instructions. no electric tesistance heating, and no pilot. 2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or spas. a. At least 36" of pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch. L.- §115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu.+hr) _.._ §118 (f): Cool Roof material meet specified criteria Lighting Measures X; §150(k)1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 tomensrwatt cr greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessibie iighting i control panel at an entrance to the kitchen. Ix ! §150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternative to this requirement allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved. 3.1 By EnergySoft User Number 5616 Job Number: 0001 ti 3 E Methad m', _ _ ( rt 1 0# 3 2 Pa _SALGADO-RESpDEN.CE _ 2/102405 Project Title Date 11-01. Bewley .StreeL_.Santa-Ana Project Address Building Permit # Western En.CCjjltleertng___ _ 4 4 1- (71-� g Telephone 7- Plan Check/Date Documentation Author _Cornputer Performance- _ _ ---- ----- -- ----- Field Check/Date Compliance Method (Package or Computer) Climate Zone _ Source Energy Use Standard _ Proposed Compliance (kBtu/sf-yr)_ Design Design Margin Existing+Addition Budget Adjustment Space Heating 5.77 9.26 -3.49 Ratio F: 1098 / 1782 = 0.616 Space Cooling 4.51 13.07 -8.57 Budget Adj: 0.616 X (56.66 - 14.58) = 25.93 Domestic Hot Water 0.00 0.00 0.00 The budget shown to the left has been increased using -- - Totals 25.93 + 10.27 = 36.20 22.33 13.87 this Budget Adjustment based upon Existing building information shown on the C-2141 which follows this form. Percent better than Standard: 38.3% Total Conditioned Floor Area: 11782 ft2 Floor Construction Type: L_-1 Raised Floor [X] Slab Floor Building Type: Single Fam Detached Building Front Orientation: (East) 90 deg 'Total Fenestration Area: 1 1.6% Number of Dwelling Units: 1.00 Total Conditioned Volume: 14,256 ft 3 Number of Stories: 1 Total Conditioned Slab Area: 1,782 ft 2 BUILDING ZONE INFORMATION # of Thermostat Vent Zone Name Floor Area Volume Units Zone Type Type Hgt. Area HVAC System 1,.782 -- 14,256 t-00 - ___-CondiiianetL __ _ -Setback_ 2 n/a Solar OPAQUE SURFACES Act Gains Type Area U-Fac. Azm. Tilt / N Form 3 Reference Location / Comments Wall . _ .-- _350 Q.385 9Q_ _--_90 X Defatlit_VVall Pflor_to 1978 -Existing- Wall ___ ._ 231 _ 0385 1a1 ____90 ,X Default l6tall_Pxior.io1978.__ Existing _-. Wall _ _ _ 62 0_385 _2-70 ._.._90 x DefauiLWall.P_riorhzia78_-.. ___ . . __ .Existins_._ -___- --- _- WalL-- _1.57 _... 0385 _ . _0- _ _ ___90 X _Default_WatLPri4Lto-197 ,. .--- ._.__ Existing-- ---.___.---. Roof.__ ____1-.098 .-_ _.09_47 __...0: ._--_0 X Wall .-- --. _ 0 __ _ 0.061 X R-19 Wall_ (W .19.2x6.1s% __ _ .-_- Addition yllall R 19_Wall_(W 1.9.2x6.-L6)---------- Addition _- .---_-----_-_ _. 11Wa11. 273 __O.0.65 270 -90 ___ Wall .. __ ____60_ 0966 -_ 0 90 _ R-19Addition_ Roaf__ 684 0.03.1 _._ 0 _. __.._ 0_ Addition- _..-_....--__---_ ...----_.-- .-_-1-7 Run Initiation Time: 12/11/04.21:26:15 Run Code_1102829175 �_- EnergyPro 3.1 By EnergySoft User Number: 5616 Job Number: 0001 Page:7 of 13 Computer Method SW mmary _ (Part 2 of 3) C-2 SALGADO RESIDENCE.__ -_ - _- -210 2005 _ Project Title Date FENESTRATION SURFACES U- Act. Glazing Type Location/ # Type Area Factor SHGC Azm. hilt Comments .L- Window-- Front---- f East)_ 58.0. 1.280.. ..--_ 9.&0. _ 90 _9.o Single Metal_ Clear DefautL - -__ -Exisiia 2. Window Left -(South) 41.0_ 1.280 _- 0.80 -_180 90 Single Metal Clear Default Existing _ 3 Window Rear (West _ -.- 0.0 _1.280_ - 0_80 _ 270 __ 90 Single Metal Clear Default _ Existing 4.. Window- Right_ (North - 33_0 1.280 0.80 _ 0 _9_0 Single Metal Clear Default _Existina _ _ 5_ Window _ .Frv_nt East _ OA _0_870 _--_,0_70 90 ouble Metal 90 D_Clear Default Addition _-- Window__Left____�ou1h.) _9 0 0.870 -_- 0 79 _.__ __�Q Do tt�le_Meta! Clear Defa�llt Addition - 7 Window 49.0_ -O ZQ. - 7.4 ---2Z2 _.._90 Rouble-Metal.-Claar_D-etautt -Atidjli.Qrt-- - 8_ Window _ Right (North) 16.0 0_870_ _ 0.70, .__ 0 90 Double Metal Clear Default Addition INTERIOR AND EXTERIOR SHADING Window - Ovverhgr)q Left Fin Right Fin # Exterior, Shade Type SHGC Hgt. Wd. Len, Hgt. LExt.RExt. _ Dist. Len. Hgt. Dist. Len. Hgt. 1 Bug Screen 2_ Bug Screen _ - _ 0.76 _ 3 Bug Screen -_ _- _ _ _ 0.76 4__ Bu.g.Screen --- -- -�- 0.76, j 5-- Bug Screen-- - --- . 0.76 - B.ugScreen___ 0.73-- 7. BugScreen -_ 0.76 ud - 8 BScreen 0.76 -- --- - - - - - ------------- :ago 6 of 13 EnergyPro 3.1 By EnergySoft User Number: 5616 Job Number: 0001 Pa e:8 of 13 No. I B Revision/Issue I Date Owner. ANGELICA SALGADO 1101 S. BEWLEY ST. SANTA ANA CA, 92703 Project Planner. BUILDING ROSEWOOD1123 S. ;a x ANA, CA 92707