Loading...
HomeMy WebLinkAbout10148678.pdf..4t11 of Ems � I'' 3� uS r t i f............................. CIER I Ir ICA I h Or COMP LIAA U.L: RESIDENTIAL (Lae I of 3) C&M M-OAl Project Title', Dat2, Project Addre Building ildin # Plan Check / Date Field Check / Date r-nlOrCeMent Agency Use only GENERAL INFORMATION, Total Conditioned Floor Area Average Ceiling Height: ft Conditioned Slab Floor Area A,OP-4-9ft2 , Z4� ft2 Building Type: J,/_ Single Family L,-Addition (check one or more) Multi -Family Existing -Plus -Addition Front Orientation: kL9_rb / South East /, West / All Orientations I Number of Stories (input front orientation in degrees from True North and circle one). Number of Dwelling Units: Floor Construction Type: (Slab iaised Floor (circle one or both) RADIANT BARRIER (required in climate zones 2,4,8-15) Required for this submitta//yes no Component Type Wall Frame Type wd = wood stl = steel WD Cavity Insulation R-Value SheathingTotal Insulation R_Value R- Value' Assembly U-Factors Location/Cormnents (attic, garage, typical, etc.) Wall Roof Roof Floor Floor Slab rEdge. � — - —V .—I VW I\ V diu-, allu t-.NsuiLluly U-ractor are not Murrea lor g woog-tramed, wall that meets cavity R-value insulation requirements for the Prescriptive Package. FENESTRATION Qllfliv_ n-4— Fenestration L/TXpe/Pos. Front Orien- tation Area ftz Fenestration U-Factor Fenestration SHGC Exterior Shading Att. Overhangs/ Fins 2-4 Front — Left Left Left Rear 3z_ Rear E_ Right Skylight -Skylight Compliance Forms August MM M CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 3 of 3) C&IR 4: -1 IIIA-Ile Project Title Date COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications,needed.to comply with Title 24, Parts I and 6.of the California Code ofReplations, and the administrative regulations to implement therri. This certificate has been signed by the individual withoverall design responsibility. When this certificate of compliance is sub mlitted for a single buildi4plan to be. built in multiple Orientations, any shadingfeature that is varied is indicated in the Special Features/Remarks section. The undersigned recognize that compliance using duct sealing and TXVs requires installer testing and certification and field verification by an approved HERS rater. Resigner or Owner (per Business and Professions Code) Documentation Author Name: V /V Name: Title/Firm: Title/Firm: Allva_ pk47vo Address: AV Address: 1/0 clko 0-7a rA '77 0) Telephone: Telephone: N, Lic (si tore) ZOIN (date) (sigiratur7e el (date) Enforcement Agency - ? Title: Agency: Telephone: --- 7 (si atur /a,, Compliance Forms August 2001 A-4 CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 2 of 3) C&IR VA"t-1614,17-NI, Z 6 Z!� Project Title 7 19 e4 PR, Date HVAC SYSTEMS Note: Input hydronic or combined hydronic data under Water Heating Systems, except Design Heating Load. Distribution Heating Equipment Minimum Type and Duct or Heat Pump Type (furnace, beat Efficiency Location Piping Thermostat Configuration pump, etc.) (AFUE or HSPF) (ducts, attic, etc.), R-Value Type (split or packaEe) Cooling Equipment Minimum Duct Heat Pump Type (air conditioner, Efficiency Location Duct Thermostat Configuration heat 12ump, evap. coolinSEERJ (attic, etc.) R-Value ,e Ty2e (split or package) SEALED DUCTS and TXVs (or Alternative Measures) El Sealed Ducts (all climate zones) (Installer testing and certification and HERS rater field verification required) 0 TXVs, readily accessible (climate zones 2 and 8-15 only) (Installer testing and certification and HERS Rater or field verification required) 0 Refrigerant Charge/Air Flow (climate zones 2 and 8-15 only) (Installer testing and certification and HERS Rater or field verification required) OR 0 Alternative to Sealed Ducts and TXVs (see Package C or D Alternative Package Features for Project Climate Zone) Climate Zone Window SHGC Window U-Factor SEER Heating WATER HEATING SYSTEMS Energy External Rated' Tank Factor or Tank Water Heater Distribution Number Input (kW Capacity Recovery Standby' Insulation Tv-pe Type in System or Btu/hr Wations) Efficiency Loss (%) R-Value 1. For small gas storage water heaters (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance, and heat pump water heaters, list Energy Factor. For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list rated input and recovery efficiencies, SPECIAL FEATURES (add extra sheets if necessary). Package C and D: TXVs, Sealed Ducts, Radiant Barriers (see installation requirements for radiant barriers in Section 8.13 of the 2001 Residential Manual). Package C: thermal mass (thermal mass type, covering, thickness, and description). A ft0V1,9C-RA­P1A-& AA-Afla_, Z Wllcc Compliance Forms August 2001 A-3 MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 1 of 2) M&M Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. Instructions. Check or initial applicable boxes when completed or enter N/A if not ar)nlicable- DESCRIPTION DESIGNER ENFORCEMENT Building Envelope Measures: §150(a): Minimum R-19 Ceiling insulation. /5-, §150(b): Loose fill insulation manufacturer's labeled R-Value. §150(c); Minimum R-13 wall insulation in wood framed walls or equivalent U-Factor in metal frame walls �does not apply to exterior mass walls). §150(d): Minimum R-13 raised floor insulation in framed floors. §1500): Slab edge insulation -water absorption rate no greater than 0.3%, water vapor transmission rate no greater than 2.0.peniVinch. § 118: Insulation spccified.or installed meets insulation quality standards. Indicate type and form. § 116-17: Fenestration Products, Exterior Doors, and Infiltration/Exfiltrafion Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration products (except field -fabricated) have label with certified U-Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. § 150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. 150(f): Special infiltration barrier installed to comply with § 151 meets Commission quality standards, §150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilot lights allowed. Space Conditioning, Water Heating and Plumbing System Measures: § I 10-§ 113: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. § 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. §150(i): Setback thermostat on all applicable beating and/or cooling systems. § 1500): Pipe and tank insulation 1. Storage gas water beaters rated with an Energy Factor less than 0.58 must he externally wrapped with insulation having an installed thermal resistance of R-I 2 or greater, 2. First 5 feet Of Pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater) 3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R- 16 combined interrial/external insulation. 4. All buried or exposed piping insulated in recirculating sections of bat water systems. 5. Cooling system piping below 55° F insulated. 6. Piping insulated between heating source and indirect hot water tank. Compliance Forms August 2001 A-5 MANDATORY MEASURES CHEC-KLIST: RESIDENTIAL(Page 2 of 2)MF-lR Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used, Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance, When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as ininimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. Instructions: Check or initial applicable boxes when completed or enter N/A if not applicable. DESCRIPTION DESIGNER ENFORCEMENT Space Conditioning, Water Heating and Plumbing System Measures: (continued) §150(m); Ducts and Fans 1, All ducts and plenums installed, sealed and insulated to meet the requirement of the 1998 CMC Sections 601, 603, 604, and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B. If mastic or tape is used to sea] openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross -sectional area of the ducts. 3. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 4. Exhaust fan systems have back draft or automatic dampers, 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers, 6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and rovides shieldin Pram solar radiation tliat can cause de radation of the material § 114: Pool and Spa Heating Systems and Equipment, I. System is certified with 78% thermal efficiency, on -off switch, weatherproof operating instructions, no electric resistance heating and no pilot light. 2. System is installed with: a. At least 36" of pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch. § 115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light. (Exception: Non -electrical cookina appliances with pilot < 150 Btu/hr) § 118 (f): Cool Roof material meet specified criteria Lighting Measures: I 50(k) L: Luminaires for general fighting in kitchens shall have lamps with an efficacy of 40 lumenstwatt or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible liEliting control -Panel at an entrance to the kitchen. § l50(k)2.:• Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternatives to this requirement allowed in § I 50(k)2.; and incandescent recessed ceiling fixtures are IC (insulation cover) approved. Compliance Forms August 2001 ME �Nb 1� A 4 1