HomeMy WebLinkAbout510&512SFlower.pdf(A thru H + J)
LOCATION. 510 - 512 S. Flower (A thru H + J) FZ3
Lot
E 18 Units GROUP R-1 TYPE VN
/888,—
Bluck'. '
VA, CUP, R%S SO.. FT. RES. 4336 _ GAR 7623.
Tract
GImprovements Required L4ire Dept approv. jzg4l,
PERMIT
DATE
OWNER, CONTR., VAL. AND REMARKS
BLDG.
9534
10-31-79
Frank Barden, Owner
Barden Const,,Contr. $317,824.
PLBG.
280
12-18- 9
B&D Plumbing 20 meters
"TG.
20027
2-.13-80
B&D P1b .
SEWER
17 -
2-13-80
B&D Plb .
ELEC
- -
S & S Elect. (20 meters)
Misc.
900
-7-18-79
Bldg P/C #3796.- pd $638.52 by"Frank
Barden.
lisc.
1682
11-27-79
Plbg P/C #1070 - pd $180 by B&D Plbg-
Misc.
1765
12-10-79
Elec P/C #1601 - pd $210.98 by S&S Elec.
Elec.
,/12594
12-11-79
lhr insp (underground) for Frank M.
Barden by S&S Electric.
R1ez,���2�6$� 12�i$� 9 lhr insp. eor Frank Borden by S..S. Electric,
Elec.,422716 12-26-79 const. pole for Barden Const. Co,, owner.
12-28-79 Released construction pole service (510)
+t o-f- =t*e s ,-7-R-3- -9+1- -f-t -&f- gerAte-, -W
- - , 322 ',��- -f�'r �rarric i - Baerr dry--1ectie . ( see over)
P1bg..��3V 3626 4--80 2 roof drain/rain water piping for Barden by
B&D 'Plumbing,
Plbg,,-'Y'A33699 5-2-80 2 roof drains for Flower St. Joint Venture by Barde
Const. (510)
5-7-8fd Released gas (30 day temporary) (house meter)
P1bg. 33724 5-7-80 30 day temporary gas permit - prior to final for
F�'lower St. Joint Venture by Barden Const,
P1bg,J�A33809 5-22-80 1 lawn sprinkler for Barden Constr,, owner I
5-27-80 Released final gas & electricity - 30 day temp, gas house
meter off
Bldg.V:20596 7-19-83 Domestic solar hot water system
Elec.✓01190 7-19-83 1 out/fix/sw, 1 approved factory prewired unit,
1 motor
Solarv400635 7-19-83 8 collectors, 4 tanks
Address 510 S. Flower
Unit #