HomeMy WebLinkAbout101103508 - PermitPlanning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
OISABLED ACCESS COMPLIANCE
DOCUMENTATION FORM
ACC,01 CBC 2016
A. PURPOSE OF THIS DOCUMENTATION: (check one)
B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER:
Proiect Address
291 'l Tech Center Drive
Permit Number
101 103508
Project Description:
Tenant lmprovement
Floor Number
Business Name / Owner
Jungle Boys
Buslness Phone Number
Legal Properly Owner
Jungle Boys
Phone Number
Total Conslruction Cost or Projecl Valualron
$ 184,ooo.oo
Cosl of Providing Complete Disabled Access
$ 22,500.00 (Alterations only)
1. The cost of all construction contemplated in the determination of the valuation of improvement
threshold based on the valuation of site and building improvements for the last three-year period.
Permit No lssuance Date Valuation of lmprovements
Total
36,800.002. 2Oo/o of fotal Construction Cost or Project Valuation:
3. The actual amount to be spent to provide disabled access
S
22.500.00
Describe the impact of the proposed improvements on financial feasibility oi the pro,ect.
The proposed improvements will not have an impact financially since the alterations
$
4
are accounted for. The project valuation exceeds the threshold and therefore requires
the alteration of the first floor to be fully compliant
5. Describe the nature of the use of the facility under construction and its availability to persons with
disabilities and the nature of accessibility that would be gained or lost:
During construction a disabled person will have access to an accessible parking stall,
accessible entrance and use to an accessible restroom
Rev 1/9/2017 Page 1 ol2
*-SANTA
NAJI[{I
E finaing of unreasonable hardship for pro.jects UNDER the valuation threshold*
! finding of unreasonable hardship for projects OVER the valuation threshold.
E Certification of Full Compliance with the 2016 California Building Code
* Valuation threshold as defined in the 2016 California Building Code, Section 118-202.4 (Exception #8) and
Section 202 is $lsqlgz (as of J anuary 2017)
6. ldentify the accessibility features and equivalent facilities that !ryltt be brought into compliance with
the latest edition of Title 24 as a part of this project and an estimate of the cost of each item:
(Documentation may be required)
Accessible Features to be Made Accessible Cost of lmprovement
a. Entrance
Door E Landing ! Stairway/Steps E Ramp $
b. Path of Travel
E Path of travel from accessible parking to the building entrance
and area of remodel $
E Path of travel to sanitary facilities / public phone / drinking fountain $ 3,000.00
n Path of travel from the public way to the building entrance $
c. Sanitary facilities ( Floor no. 1 ) Existing (2) RR to be altered $ 14,000.00
d. Public phone(s)N/A $
e. Drinking fountain(s) Adding new DF to meet Chapter 118 $ 3,500.00
f. Parking N/A $
g. Signage & Alarms Adding missing signage to meet Chapter 1 1B $ 2,000.00
i. Other N/A $
$ 22,500.00Tota l:
Accessible Features Not to be lmproved Coat of lmprovement
a $
b $
c
$Tota l:
8. Petitioner must be the legal property owner or his/her legal representative:
I certify that the above noted information is true and correct.
! Legal Property Owner E ArchitecuEngineer E Contractor E Other
print Name: Rafael Rodriguez Phone No 949-783-0727
31878 Del Obisp o st. #1 492675
Signature Date 05-31-2021
Approved by
Rev:11912017
FOR AGENCY USE ONLY
Date
Page 2 ol2
7. ldentify the accessibility features that WILL NOT comply if a request for unreasonable hardship is
granted. Provide an estimated cost of compliance for each item: (Documentation may be required)
Address: