Loading...
HomeMy WebLinkAbout101103508 - PermitPlanning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org OISABLED ACCESS COMPLIANCE DOCUMENTATION FORM ACC,01 CBC 2016 A. PURPOSE OF THIS DOCUMENTATION: (check one) B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER: Proiect Address 291 'l Tech Center Drive Permit Number 101 103508 Project Description: Tenant lmprovement Floor Number Business Name / Owner Jungle Boys Buslness Phone Number Legal Properly Owner Jungle Boys Phone Number Total Conslruction Cost or Projecl Valualron $ 184,ooo.oo Cosl of Providing Complete Disabled Access $ 22,500.00 (Alterations only) 1. The cost of all construction contemplated in the determination of the valuation of improvement threshold based on the valuation of site and building improvements for the last three-year period. Permit No lssuance Date Valuation of lmprovements Total 36,800.002. 2Oo/o of fotal Construction Cost or Project Valuation: 3. The actual amount to be spent to provide disabled access S 22.500.00 Describe the impact of the proposed improvements on financial feasibility oi the pro,ect. The proposed improvements will not have an impact financially since the alterations $ 4 are accounted for. The project valuation exceeds the threshold and therefore requires the alteration of the first floor to be fully compliant 5. Describe the nature of the use of the facility under construction and its availability to persons with disabilities and the nature of accessibility that would be gained or lost: During construction a disabled person will have access to an accessible parking stall, accessible entrance and use to an accessible restroom Rev 1/9/2017 Page 1 ol2 *-SANTA NAJI[{I E finaing of unreasonable hardship for pro.jects UNDER the valuation threshold* ! finding of unreasonable hardship for projects OVER the valuation threshold. E Certification of Full Compliance with the 2016 California Building Code * Valuation threshold as defined in the 2016 California Building Code, Section 118-202.4 (Exception #8) and Section 202 is $lsqlgz (as of J anuary 2017) 6. ldentify the accessibility features and equivalent facilities that !ryltt be brought into compliance with the latest edition of Title 24 as a part of this project and an estimate of the cost of each item: (Documentation may be required) Accessible Features to be Made Accessible Cost of lmprovement a. Entrance Door E Landing ! Stairway/Steps E Ramp $ b. Path of Travel E Path of travel from accessible parking to the building entrance and area of remodel $ E Path of travel to sanitary facilities / public phone / drinking fountain $ 3,000.00 n Path of travel from the public way to the building entrance $ c. Sanitary facilities ( Floor no. 1 ) Existing (2) RR to be altered $ 14,000.00 d. Public phone(s)N/A $ e. Drinking fountain(s) Adding new DF to meet Chapter 118 $ 3,500.00 f. Parking N/A $ g. Signage & Alarms Adding missing signage to meet Chapter 1 1B $ 2,000.00 i. Other N/A $ $ 22,500.00Tota l: Accessible Features Not to be lmproved Coat of lmprovement a $ b $ c $Tota l: 8. Petitioner must be the legal property owner or his/her legal representative: I certify that the above noted information is true and correct. ! Legal Property Owner E ArchitecuEngineer E Contractor E Other print Name: Rafael Rodriguez Phone No 949-783-0727 31878 Del Obisp o st. #1 492675 Signature Date 05-31-2021 Approved by Rev:11912017 FOR AGENCY USE ONLY Date Page 2 ol2 7. ldentify the accessibility features that WILL NOT comply if a request for unreasonable hardship is granted. Provide an estimated cost of compliance for each item: (Documentation may be required) Address: