Loading...
HomeMy WebLinkAbout10150291.pdfAr v I-xic ADDITION Tu. _71 7_1 Av, .Aftft t 0000" mw ub 5■p No bOft""l bAm%ANTA ANA, CA 92707 Am&. mw&ARTQ'"""mL Ow: to 6jvi 1 2- 49' ' 49 ------ ------ ------ SHEET INDEX A- 1 TITLE SHEET, SITE PLAN, DEMOLITION PLAN & MISC. DATA A- 2 FLOOR PLAN & ROOF PLAN A- 3 ELEVATIONS, SECTION & DETAILS S-1 EXIST'G & NEW FOUDAIJON PLAN CID S-2 ROOF FAMING PLAN C? C? SD-1 STRUCTURAL DETAILS ;4 i EN-1 TITLE 24 ENERGY FORMS (9,G 0 (z 0 (s- z F - - - - - - - - - - I � i PROJECT TEAM 1 Y-0" i i Y-Y' 27'-4!'SETBACK [SETBACK 274" SETBACK SETBACK DESIGNER: T24 REPORT PREPARED BY. J&RINTERNATIONAL, INC. ADVANCED TITLE 24 2225 W. BROADWAY AVE., E-301 12350 N. HARBOR BLVD., ANAHEKCAAW SUM 235 - — — — — (El JOSE L. JUSTINIANO ARAM (E)GARAGE FULI-ERTON, CA 92835 (N) 8'-0" (714)496-2737 joseLjusfiniano@sb4obal.net 714.525.9824 ISETBACK tAftacbefl.net I (N) 641 REUD I BETWEEN I- A V FS (1'4) 51-0" 1 L PER CODE SEC. 503.2 E BACK PROJECT INFORMATION S _4 L R JOB ADDRESS A R C Hllri Cl U A L T 2205 S. PARTON ST. E V SANTA ANA, CA 92707 L SITE INFORMATION: M13 h , E CONSTRUCTION TYPE :V-NN KL -,R ON SPAINKED L -1 �o' em OCCUPANCY R3/U1 (E) WAIER ZONING :R JEATER (N) 200 AMP. ELEC. T,­, TO REMAIN NUMBER OF STORY ONE a (N) a Cj _METER. FIELD (E) 150 AMPS D­' r SITE AREA :6,125 sq. ft �41, u 4 r i BEDROOM 3 C r-4, VERIFY BY i, i ELEC. METER (E) HOUSE AREA (EXCLUDED GARAGE) 800 sq. ft CONTRAC OR TO BE TIPA3 RELOCATED (E) GARAGE 390 sq. ftC A . (E) WATER (N) ADDITION 600 sq. ft. d '.-RFATER J_ At ll-AX �TA 'iTO REMAIN 5'-0" TOTAL FOOT PRINT AREA: 1,790 sq. ft (29.22 % OF SIf SETBACK + lArl i I (E) (E) KITCHEN F-A (E) (E) KITCHEN OM 2 REDVqOWNER BEDROOM 1 -11, SETBACK -oo w:- MR. JORGE GUERRERO L SETBACK %L U ) FLOOR 2205 S. PARTON ST. (E L (E) FLOOR FURNACE SANTA ANA, CA 92707 SETBACK FURNACE TOREMAIN r- — — — — — — — — — — — — — — 1- - V _4LEGAL DESCRIPTION :A (E) LIVING ROOM LIVINGROOM i �. '­ ': - ..' ��' ­ PARCEL No. 015-102-02 LOT No. 22 OF TRACT MAP No. 1281 BEDROOM OM I BEDROOM 2 CITY OF SANTA ANA COUNTY OF ORANGE L- - - - - - - - - _ -- - - - - - - - - - - - GENERAL NOTES: 1. GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS AND LOCATION OF EXISTING UTILITIES BEFORE START OF WORK. ANY DESCREPANCIES BETWEEN PLANS AND FIELD CONDITIONS MUST BE BROUGHT TO DESIGNER'S ATTENTION IN WRITING PRIOR TO START OF CONSTRUCTION. j 2. GENERAL CONTRACTOR TO SECURE ALL NECESSARY (E) (E) PERMITS AS REQUIRED TO COMPLETE CONSTRUCTION. DRIVEWAY:,. i r DRIVEWAY, 3. ALL WORK TO CONFORM TO THE FOLLOWING: BUILDING CODE - CBC 2001 PLUMBING CODE - CPC 2WI MECHANICAL CODE - CMC 2001 ELECTRICAL CODE CEC 2001 4. DIMENSIONS ARE FACE OF STUD TO FACE OF STUD U.N.O. 5. GENERAL CONTRACTOR SHALL INSTALL ALL REQUIRED BLOCKING FOR . .. . .. ALL EQUIPMENT, HANGERS, ETC. 49' 49' 6. ALL WORK SHALL CONFORM TO ALL LOCAL AND STATE CODES AND REGULATIONS. S. PAKTN S. P"' A R T 0 AN T. 7. INTERIOR WALLS SHALL BE FACED BOTH SIDES WITH 5/8" ARD 19% DRYWALL.TYP. lok I glowl Ll ION r AN Aft Idimp- U JH H H H 'OVID, 0 S D C SCALE: 118)'=1)=0)k SCALE: 1/4"=1'=0)) THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN AS AN INSTRUMENT OF PROFESSIONAL SERVICE IS THE PROPERTY OF J&R INTERNATIONAL, INC, AND IS NOT TO BE USED IN WHOLE OR PART FOR ANY PROJECT OTHER THAN THE ONE IDENTIFIED HEREIN WITHOUT THE WRITTEN AUTHORIZATION OF J&RINTEIRNAIIONAL, INC. THIS DOCUMENT SHALL NOT BEREPRODUCED ORMODIFIEDIN ANY WAY WITHOUT THE EXPRESSED WRITTEN CONSENT OF, J&RINTERNAlIONAL, INC. GENERAL CONTRACTORTO VERIFY ALL DIMENSIONS, DETAILS AND LOCATION OF EXISTING UTILITIES BEFORE START OF WORK. ANY DESCREPANCIES BETWEEN PLANS AND FIELD CONDITIONS MUST BE BROUGHT TO J&R INTERNATIONAL, INC. ATTENTION IN WRITING PRIOR TO START OF CONSTRUCTION. DO NO(� IREVISION I NO. I DATE 'Fni' Cq 00 C? 00 r- ON ON z >Z C) z 0*0 fu Gn en 821 1 Cq V) F-4 Z 0 � 0 0 rl P4 u 0 w I z z: fn 0 DRAWN BY: J&%.,Ijnc CHECKED BY: J&R DESIGNED BY: At), Inc. DATE 01/31 SCALE AS fED JOB NO 04 FILE NAME* A-1 DRAWING A� OF SETS SCALE THE DRAWING _=1 =1 600 sq. ft./250=4 sq. ft. ATTIC VENTILATION AREA REQUIRED 5.5 sq. ft. ATTIC VENTILATION AREA PROVIDED THE NET FREE VENTILATING AREA SHAI-L NOT BE LESS THAN 11150 OF THE AREA OF THE SPACE VENTILATED. COMPLIANCE BY CBC 2001 SECTION 1505.3 (VENTILATION) ATTIC VENTS SHALL, NOT EXCEED 144 SQUARE INCHES AND SHALL BE COVERED WITH CORROSION RESISTANT WIRE MESH WITH MESH OPENING OF 1(4, INCH. SCALE: 1 /4"=1'=O" 21'-9„ DOOR 9 4 i lS BEDIt,00M 2 ; r (E) KITCHEN � I 1ti I rr 1 I 4\ t rr > i Lt IF) FLOOR i FURNACE I- ---------------- -------- SD DINING ROOM 1 f s f I f SD (E) LIVING ROOM I t !- I I t 1 I i (E) f BEDROOM 1 1 i I I i t I 1 I 1 I 1 I !✓ ® ! f f L--------------------- ----------------------------------------------------------- J SCALE: 1 /4" -1'=O" ar n w �rrrrrrrri GENERAL LEGEND EXIST'G 2x4 WOOD STUDS WALL TO REMAIN '11'tiff fiTt�iTiT`f NEW 2x4 WOOD STUDS WALLS NEW 2x6 WOOD WALLS KEY NOTES 30"x30" ATTIC ACCESS. PROVIDE CERAMICTILES OVER CEMENT PLASTER OVER WONDER BRD. EQUAL TO 70" ABOVE DRAIN AT 3 WALLS OF SHOWER TUB. GLASS SLIDING DOOR AND PANELS MUST BE LABELED CATEGORY II. LOW FLUSH. 1.6 GALLON TOILET FIXTURE ® FULL HEIGHT LINEN CABINET NEW WALL FURNACE FLUORESCENT LIGHT CONCRETE LANDING W/ I/T PER FOOT SLOPE MAX. (SEC.10049 UBC) LANDING TO BE MINIMUM 36" DEEPx WIDTH OF DOOR. ELECTRICAL NOTES 1. PROVIDE ONE WALL SWITCH -CONTROLLED LIGHTING OUTLET AT THE EXTERIOR SIDE OF OUTDOOR ENTRANCES OR EXITS, ETC. (210-70-a NEC) EX. AT GARAGE MAIN DOOR. 2. PROVIDE GROUND -FAULT CIRCUIT -INTERRUPTER PROTECTION (GFCT) FOR ALL 125 VOLT, SINGLE-PHASE I5-AND 20-AMPERE RECEPTACLES INSTALLED IN BATHROOMS, GARAGES (EXCEPT DEDICATED OUTLES) AND OUTDOORS WITHIN 6'-6" OF GRADE. (210-8(a) NEC) 3. PROVIDE WATER PROTECTION FOR ALL RECEPTACLES INSTALLED OUTDOORS. (410-57 NEC) (E) EXISTING (N) NEW ELECTRICAL LEGEND NOTE: ALL LIGHT SWITCHES TO BE DIMMER (EXCEPTION: FLUORESCENT LIGHT SWITCHES) = 1 I0 V DUPI FX OUTI ET + 12" U.N.O. GFI: GROUND FAULT INTERRUPTER WP: WEATHERPROOF 112 HOT 110 V FOURPLEX OUTLET 110 V DUPLEX OUTLET IN FLOOR - TELEVISIONJACK COMPUTER TERMINAL TELEPHONEJACK -- SINGLE POLE TOGGLE SWITCH 3 +40" U.N.O.3: 3 WAY SWITCH SURFACE MOUNTED CEILING LIGHT FIXTURE SURFACE MOUNTED WALL LIGHT FIXTURE ® RECESSED LIGHT FIXTURE 4 EXHAUST FAN SD HARD WIRED WITH BATTERY BACK UP SMOKE DETECTOR FLUORESCENT TUBE, SIZE NOTED 4. ALL LIGHT FIXTURES INBATHROOM & KITCHEN AREAS SHALL BE FLUORESCENT. LIGHT FIXTURES TO BE SELECT BY THE OWNER. 5. ELECTRICAL LIGHT SWITCHES FOR BEDROOMS TO BE ON ARCH CIRCUIT. 6. PROVIDE A.F.C.L PROTECTION FOR BEDROOM CIRCUITS. 7. PROVIDE BATHROOM A MINIMUM OF (1) 20-AMP CIRCUIT RECEPTACLE OUTLET. SUCH CIRCUIT SHALL HAVE NO OTHER OUTZETS. THIS CIRCUIT MAY SERVE MORE THAN ONE BATHROOM (CEC 210-52 (d)). 8. INSTALL MINIMUM 20 ft, UFER GROUND MINIMUM 1 #2 COPPER TO NEAREST COLD WATER PIPE GROUND PER CEC 250. 1. GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS AND LOCATION OF EXISTING UTILITIES BEFORE START OF WORK, ANY DESCREPANCIES BETWEEN PLANS AND FIELD CONDITIONS MUST BE BROUGHT TO DESIGNER'S ATTENTION IN WRITING PRIOR TO START OF CONSTRUCTION. 2. GENERAL CONTRACTOR TO SECURE ALL NECESSARY PERMITS AS REQUIRED TO COMPLETE CONSTRUCTION. 3. ALL WORKTO CONFORM TO THE FOLLOWING: BUII.DING CODE - CBC 2001 PLUMBING CODE - CPC 2001 MECHANICAL CODE - CMC 2001 ELECTRICAL CODE - CEC 2000 4. DIMENSIONS ARE FACE OF STUD TO FACE OF STUD U.N.O. 5. GENERAL CONTRACTOR SHALL INSTAIL ALL REQUIRED BLOCKING FOR ALL EQUIPMENT, HANGERS, ETC. 6. AI. I.. WORK SHALL CONFORM TO ALL LOCAL AND STATE CODES AND REGULATIONS. 7. INTERIOR WALLS SHALL BE FACED BOTH SIDES WITH 5{8" STANDARD DRYWALL.TYP. 8. PLAN CHECK/PERMPT APPLICATION FOR WHICH NO PERMITS IS ISSUED WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION SHALL EXPIRE BY LIMITATION PER SECTION 107.4 CBC. 9. ELECTRICAL WIRING SHALL BE COPPER, NO ALUMINUM WIRING ALLOWED UNLESS CONTINUOUS SPECIAL INSPECTION IS PROVIDED. CONSULT CITY ORDINANCE ARTICLE 110 AND SECTION 110-115. 10. RECESSED LIGHTS AT INSULATED CEILINGS SHALL BE UL LISTED FOR DIRECT CONTACT WITH INSULATION, (ITC FIXTURES). 11. PROVIDE WINDOWS THAT ARE RATED AND CERTIFIED FOR 20 LBS/SF OF WIND LOAD FOR THIS CLIMATE ZONE. 12. PROVIDE MOIST STOP FLASHING AROUND ALL WINDOWS, DOORS AND OTHER OPENINGS. 13. PROVIDE BTTCHUTHANE AT OTHER NEEDED LOCATIONS SUCH AS INTERSECTING EXTERIOR CONSTRUCTION SURFACES, SMALL EXTERIOR SHELVES AND AT EXTERIOR PENETRATIONS. 14. EXTERIOR STUCCO SHALL COMPLY WITH CHAPTER 25 CBC. PROVIDE SEPARATE INSPECTIONS FOR EACH INSPECTION AT PHASES OF EXTERIOR PLASTER AS FOLLOW: SCRATCH COAT, BROWN COAT, AND COLOR COAT. PROVIDE 60-MINUTE BUILDING PAPER MINIMUM FOR EXTERIOR STUCCO. 15. PROVIDE TWO LAYERS OF GRADE "D" PAPER AT ALL EXTERIORS WALLS WITH WOOD BASE SHEATIILNG AND STUCCO COVERING PER SECTION 2506.4 CBC. 16. NO PLASTIC WATER PIPING ALLOWED WITHIN THE BUILDING. 17. OWNER SHALL EMPLOY THE SERVICES OF REGISTERED DEPUTY INSPECTOR, WHO MUST REPORT TO THE CITY BUILDING OFFICIAL PRIOR TO REPORTING TOO THE JOB SITE. 18. THREE CONCRETE CYLINDER TEST SAMPLES SHALL BE TAKEN AND TESTED FOR EACH (ENGINEER OF RECORD TO FILL-IN SPACI) 19, MINIMUM GRADE PLYWOOD AT OVERHANGS TO BE CCX OR 1X T & G SHEATHING. 20. PROVIDE A MINIMUM CLASS A ROOFING MATERIAL. WITH AN ICBO OR UL LISTING. ROOFING MATERIALS SHALL BE INSTALLED TO MEET HIGH WIND EXPOSURE "C" CONSTRUCTION RTQUIREMENT'S. ALL ROOFING MATERIALS MUST OVERHANG THE EDGE OF THE ROOF SURFACE. PLYWOOD ROOF SHEATHING NG IS REQUIRED UNDER ALL ROOFS (UNLESS RE ROOFING OVER EXISTING SHINGLES). 21. THE OWNER AND PROFESSIONAL DESIGNER HAVE RESEARCHED THE PARCEUS SETBACK AND EASEMENTS. THE PARCELS SETBACKS AND EASEMENTS ARE CORRECTLY SHOW ON THIS SITE PLAN. 22, PLYWOOD SHEAR WAIL JOINT AND SILL PLATE NAILING SHALL BE STAGGERED IN ALL CASES. 2.,3, Apt wow c0ws"rvQCTiQ" .6tlAu- GeeA'AfL Y Wi r+i C'�-J:)� iF- S�c~ri� nZ0 A43-D M1N. kA! Ldroccl Wi-rH %F1a-LE 2!3- 11- 13 A-- 1 . REVISION NO. I DATE t S z a } P-4 a fZ d t- ,,y 0���C 0 � �-? N M w O Q d Ql 0 0 � wtj NG�1 c 0 P4 ZC� P4 0 u '- V 4 0 In o CIS w w sn O DRAWN BY: J&R Intl, Inc. CHECKED BY: J&R Int'I, Inc. DESIGNED BY-J&R Int'i, Inc. DATE 01/31/05 SCALE AS NOTED JOB NO 04-153 FILE NAME: A-2 DRAWING Arwr2 OF SHEETS THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN AS AN INSTRUMENT OF PROFESSIONAL SERVICE IS THE PROPERTY OF J&R INTERNATIONAL; INC. AND IS NOT TO BE USED IN WHOLE OR PART FOR ANY PROJECT OTHER THAN THE ONE IDENTIFIED HEREIN WITHOUT THE WRITTEN AUTHORIZATION OF J&R MIERNATIONiM , INC. THIS DOCUMENT SHALL NOT BE REPRODUCED OR MODIFIED IN ANY WAY WITHOUT IHE EXPRESSED WRITTEN CONSENT OF J&.R INTERNATIONAL, INC. PLOT DATE01/28j05 * GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, DETAILS AND LOCATION OF EXISIING UTII.,ITIES BEFORE START OF WORK. ANY DESCRE:PANCIES BETWEEN PLANS AND FIELD CONDITIONS MUST BE BROUGHT TO J&R INTERNATIONAL INC. ATTENTION IN WRITING PRIOR TO START OF CONSTRUCTION. Da NOT SCALE THE DRAWING 2x4 STUDS 16 O.C. 0 R13 BATT INSULATION NEW STUCCO TO MATCH EXISTG +I > NEW COMP. S11INGIF ROOF (CLASS B MIN.) OVER 2 LAYERS 15# FELT TO MATCH EXISTING. 2x8 ROOF RAFTER 24" O.C., PER SIRUCT. DWGS. 12 4F —,00 GYB. BRD. -\'4A STUDS @ 16" O.C. 2x8 CLQ. J. @ 16 O.C, PER STRUCT. DWGS. W/ R30 INSUIATION NEW BEDROOM R 13 BATT INSULATION NEW 7/8" STUCCO TO MATCH EXISTG SECTION SCALE 1 1 1/411=1,-O,l 1 2 FRAMING MEMBERS ROOFING MATERIAL ROOF SHEATING COPPER VALLEY FLASHING 2ro GA MIN. STUCCO 0/ 131-06. FAFE PLYWOOD 5 (UJHERE OCC STUCCO UJEE 5CREED '91111WIM-5503 iTUD WALL '.T. SILL C. FOUNDATM N. AE30VE EARTH R ABOVE PAYEE? AREAS TYPICAL STUCCO: 1/6' STUCCO CEMENT PLASTER W/ EXPANDED METAL LATH OR WOVEN WIRE LATH FASTENED W1 11 GA. I 1/2LONG 1116' DIA. HEAD GALVANIZED NAILS BEFURRED MIN. 1/4" SPACED IV OC MAX SCALE VALLEY N.T.S. 6 STUCCO WEEP SCREED -1 N.T.SSCALE. EXTERIOR FINISH -UNDERLAYMENT TO LAP OVER FLASHING 2x ROOF RAFTER 6 I(o O.C, PER 5TRUCT. DU1G5. `Z' BAR FLASHING AND UN-0. COUNTER FLASHING ROOF SHEAT'G, 12 zi METAL CHANNEL SEE STRUCT- DWGS- 4 ROOF MATERIAL COMP. SHINGLE ROOF (CLASS 6 MIN.) OVER 2 LAYERS 15* FELT 0 v It A,) Alj�Al A'A -2-2x4 TOP PLATES -R-13 BATT INSULATION /8' -5/8. GYP. ED. ROOF SHEATHING STUCCO I')x4 77-7 -- STUDS a 16'0.C- W/NO 2x FASCIA PLUMBING 4 2xro STUDS e I x NAILER lCv*O.C:, U.11 FLUM51NG \---2X FRAMING OVERHANG TO MATCH 2x C. J. w 16' O.C., PER EXISTG STRUCT- DU,66. W/R-30 BATT INSULATION <; C—e G z S p I A. L- -C c> SCALE SCALE ROOF TO WALL EAVE DETAIL N.T.S. N.T.S. NEW 2 X 4 0 lu 5TUD5 AT lro'o.c. Cl 0 LAP EXISTING MESH AND LU tu FELT PAPER 2' WITH NEW MESH AND f=Af=I=F- AND 7 NAIL WITH 11 GA. NAILS ro*o.c. TO NEW 5LOGKING — NEW FASCIA TO MATCH EXISTG NEW STUCCO TO MATCH EXISTG F.F. (SLAB ON NEW ADDITION — NEW COMP. SHINGLE ROOF (CLASS A MIN.) OVER 2 LAYERS 15# FELT TO MATCH EXISTG EXISTG HOUSE m EXISTG HOUSE I ILLJ I I ILILLU x Lu-EXISTG RAISED FLOOR) (E) WATER HEATER LOCATION `TO REMAIN NORTH ELEVATION NEW ADDITION NEW COMP. SHINGLE ROOF (CLASS A MIN.) OVER 2 JAYFRS 15# FELT TO MATCH EXISTG NEW FASCIA -- TO MATCH LTJSrG 3 NEW STUCCO �TO MATCH EXISTG F.F. (SLAB ON NEW COMP, SHINGLE ROOF (CLASS A MIN.) OVER 2 LAYERS 15# FELT TO MATCH EXISTG 1 /4pp == 1 '— O'p NEW PITCH TO MATCH EXISTG - NEW FASCIA TO MATCH EXISTG I REVISION I NO. I DATE ,o Zm M" 00 rn Cn 00 z > z F--4 Z 0,01 U Cn q —4 Z F- (n z 0 0-4 'Fl r) 0 Z 0 0 u 0 0 z 0 con 0 z it 0 0 o Z t4 Z 0 0 U *--o Ols F-4 u z 0 0 0 111 tri 0 DRAWN BY: J&R Int'l., Inc. CHECKED SY: J&R Int'l, Inc. DESIGNED BY: J&R Int'l, Inc. DATE 01/31/05 SCALE AS NOTED JOB NO 04-153 FILE NAME- A-3 DRAWING A�3 OF SHEETS THIS DOCIfMENT, AND THE IDEAS AND DESIGNS INCORPORATEI) HEREIN AS AN INS'FRIJMI--,N'l- OF PROFESSIONAL SERVICE IS THE PROPERTY OF J&R INTERNATIONAL, INC. AND IS NOT TO BE USED IN WHOLE OR PART FOR ANY PROJFCT OTHER THAN THE ONE IDENTIPIEDHEREIN WITHOUT THE WRITTEN AUTHORIZATION, OF J&R INTERNATIONAL, INC, THISDOCUMENT SHAIf.NOrl-BFRl,,PROI)IJCFDOR MODIFIEDIN ANY WAY WITHOUT THE EXPRFSSEDWRJTTFN CONSFNTOF J&RINTFRNATIONAI,,INC. PLOT DATE: 08/19/05 GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, DETAILS AND LOCATION OF EXISTING UTILITIES BEFORE START OF WORK ANY DESCREPANCIES BETWEEN PLANS AND FIELD CONDITIONS MUST BE BROUGHT TO J&R INTERNATIONAL, INC. ATTENTION IN WRITING PRIOR TO START OF CONSTRUCTION. DO NOT SCALE THE DRAWING AB48 5/8" DIA. X 10" ANCHOR BOLTS AT 48" O.C. AB32 5/8" DIA. X 10" ANCHOR BOLTS AT 32" O.C, AB24 5/8" DIA. X 10" ANCHOR BOLTS AT 24" O.C. AB16 5/8" DIA. X 10" ANCHOR BOLTS AT 16" O.C. AB 8 5/8" DIA. X 10" ANCHOR BOLTS AT 8" O.C. AB48X 5/8" DIA. X 12" ANCHOR BOLTS AT 48" O.C. AB32X 5/8" DIA. X 12" ANCHOR BOLTS AT 32" O.C. AB24X 5/8" DIA. X 12" ANCHOR BOLTS AT 24" O.C. AB16X 5/8" DIA. X 12" ANCHOR BOLTS AT 16" O.C. AB 8X 5/8" DIA. X 12" ANCHOR BOLTS AT 8" O.C. * 2AB (2) 5/8" DIA X 10" ANCHOR BOLTS. * 3AB (3) 5/8" DIA. x I D" ANCHOR BOLTS. * 2ABX (2) 5/8" DIA X 12" ANCHOR BOLTS. * 3ABX (3) 5/8" DIA X 12" ANCHOR BOLTS. * 2ABXX (2) 3/4"DIA X 12" ANCHOR BOLTS. * 3ABXX (3) 3/4"DIA X 12" ANCHOR BOLTS. * EQUAL SPACING. EXCLUDING HOLDOWN A BOLT. "M 1, GENERAL CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY ALL THE EXISTING DIMENSIONS, ELEVATIONS AND CONDITIONS BEFORE START OF WORK, ANY DISCREPANCY SHOULD BE BROUGHT TO THE ATTENTION OF J&R INTERNATIONAL, INC. IMMEDIATELY. NEW FOUNDATION EXISTING FOUNDATION (N) 18"x18" THK PAD FOOTING SEE- W/4x4 POST 4) jc 5/8 ORED HEAD @ 24" O.C. (8" EMBED. 2" MIN. EDGE DISTANCE) SCALE: 1/4' = 1'-0" 1. CONCRETE: All work, testing and inspection shall conform to the 2001 California Building Code. Strength Design used for all concrete grades. Concrete Strength Location (28 day) f'c = 2500 psi all the concrete USE TYPE V CEMENT Maximum Size of aggregate should be 1", 1 1/2' aggregate may be used in continuous footings or isolated pod. 2. REINFORCING STEEL: Shall be deformed bars conforming to A.S.T.M. A615, see schedule below for grade of reinforcing steel, Placing of reinforcing steel shall be in accordance with Section 2607 of the Uniform Building Code, Latest Edition. Electrically welded mesh shall conform to A,S.T.M. A185. GRD. 60: all the reinforcing. 3. BOLTS: Shall conform to A.S.T.M. A307. 4, LUMBAR: All lumbar shall be grade marked No.2 minimum except as noted on plan. Plywood shall be Doulgas Fir sheathing conforming to PS 1-83 United States Department of Commerce and shall be grade stomped "D.F.P.A." Exterior Clue. 5. SOIL: 1000 PSF. 6- DRYPACK: Shall be "Embeco" or approved equal 7. GENERAL CONTRACTOR IS FULY RESPONSIBLE TO VERIFY ALL THE EXISTING DIMENSIONS, ELEVATIONS AND CONDITIONS BEFORE START OF WORK, ANY DISCREPENCY SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY. ALL DIMENSIONS SHALL BE VERIFIED WITH THE ARCHITECTS DRAWINGS ANY DISCREPANCIES SHALL BE RESOLVED PRIOR TO COMMENCING OF WORK, 1. ALL EXTERIOR WALLS ARE TO BE SECURED WITH 5/8" DIAMETER BY 10" LONG ANCHOR BOLTS EMBEDDED AT LEAST 7" INTO CONCRETE WITH A MAXIMUM SPACING OF 72" O.C. THERE SHALL BE A MINIMUM OF TWO BOLTS PER PIECE OF FOUNDATION PLATE WITH ONE BOLT LOCATED WITHIN 12" OF EA. END OF EA. PIECE. A PROPERLY SIZED NUT AND WASHER SHALL BE TIGHTENED ON EA. BOLT TO THE PLATE. 2. ALL SHEAR WALLS ARE TO BE SECURED WITH ANCHOR BOLTS SPACED PER FOUNDATION PLAN 3. ALL INTERIOR NON —SHEAR WALLS ARE TO BE SECURED WITH SHOT PINS INSTALLED PER MANUFACTURERS RECOMMENDATIONS, U.N.O. STRUCTURAL ENGINEERS CALCULATIONS. GOVERN IN ALL CASES. 4. INSTALL ALL SIMPSON R APPROVED EQUAL) FOUNDATION HARDWARE PER MANUFACTURERS RR ECOMMENDATIONS. DEEPEN FOOTING WHERE NECESSARY TO PROVIDE ANCHOR EMBEDMENT AT HOLDOWN LOCATIONS, 5. PROVIDE 5/8" DIAMETER BY 12" ANCHOR BOLTS AT 3X FOUNDATION PLATES MERE OCCURS. VERIFY WITH FRAMING PLANS. 6. 2" x 2" x 3/16" STEEL PLATE WASHERS ARE REQUIRED ON EACH ANCHOR BOLT (UBC SECT. 1806.6.1) 7. ALL STUDS AT 1ST FRL SHALL BE 2X6 OR 3X4 @ 16" 0,C,(TYP) 8, THE ALLOWABLE SOIL BEARING VALUE IS 1000 PSF FOR CONTINUOUS FOOTINGS. GOLD JOINT O.F.F.T. PLATE Ulf E,/a' DIA.X AT 2 f=OUfR 12' A.15's -a4,S" O/C MIN. 4 2' X 2' x Bllre>' WASHERS SLAB ON GFADE — SEE PLAN NATURAL GRADE OR APPROVED COMPACTED FILL #4 16 O.C. 24' t3 9 00 244 12 (2) #4 T/15 MIN., TYf=1IC_AL 6) ALL CONT. FOOTINGS, U.N.O. 'I""YPICAL INTERIOR FOOTING i tk �90 cc C'n �5 Z > Z Z I It- U1, R ON U CIA U) Z W 0 0 0 Z P4 Z 0 U 0%01 Z 0 _j fy W W 1 Z 3: V) 0 DRAWN BY: J&R Intl, Inc. CHECKED BY: J&R Int'l, Inc. DESIGNED BY: J&R Int'l, Inc. DATE 01/31/05 SCALE AS NOTED JOB NO 04-153 FILE NAME: S1 DRAWING S1 OF SHEETS THIS DOCUMENT, AND TVIE IDEAS AND DESIGNS INCORPORATED HEREIN AS AN INSTRUMENT OF PROFESSIONAL SERVICE ISTITE PROPERTY OF J&R INTERNAIJONAL, INC. AND ISNOT TO BE USED IN WHOLE OR PART FOR ANY PROJECT onTER 'THAN THE ONE IDENTIFIED IJ1W­,IN WITHOUT THEWRIT'IT-iN AUTHORIZATION OF J&R INIERNA11ONAL, INC. THIS DOCUIVIENJ` -,HAII.N"I'BFREPRODIJCFI)ORMODIFII---D IN ANYWAY WITIJOUT THE EXPRFSSEDWRITTEN CONSENT OF J&RIN`TE-RNAT[ONA1,INC. PLOT DATE. 01/28/05 GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, DETAILS AND LOCATION OF EXISTING UTILITIES BEFORE START OF WORK ANY DESCREPANCIES BETWEEN PLANS AND FIELD CONDITIONS MUST BE BROUGHT TO J&R INTERNATIONAL INC. ATTENTION IN WRITING PRIOR TO START OF CONSTRUCTION. DO NOT SCALE THE DRAWING _ --------- I 1 I I I I i ! I { i I I I{ {� 1 J � I I I 1 L i i I I 1 f I 1 I I 1 ( 1 ( I i 1 I I i 1 I I { -------.._---------_.—_--------__.---------------____.__.____--_—_--._--...—._._._--_-- Roof Framing a � '' I � � � � 'a'&m -1 21 tAl ol 1 1 6 ( 2001 CRC ; SEISMIC ZONE 4 ) FRAMING MEMBERS DOUGLAS FIR -LARCH ZL VERTICAL: AT 16" O.0 A3/8" WOOD STRUCTURAL PANEL WITH 8d COMMON NAILS AT 6" O.0 AT EDGES AND 12" O.0 AT FIELD (TABLE 23-11-1-1 UBC) .........280 PLF 22. 3/8" WOOD STRUCTURAL PANEL WITH 8d COMMON NAILS AT 4" O.0 AT EDGES AND 12" O.0 AT FIELD (TABLE 23-11-1-1 UBC) .........350 PLF 3 3/8" WOOD STRUCTURAL PANEL WITH 8d COMMON NAILS AT 3" O.0 AT EDGES AND 12" O.0 AT FIELD (TABLE 23-11-1-1 UBC) .........490 PLF f� 3/8" WOOD STRUCTURAL PANEL WITH 8d COMMON NAILS AT 2" O.0 AT EDGES AND 12" O.0 AT FIELD (TABLE 23-11-1-1 UBC) .........640 PLF 5 1/2"(OR 15/32) WOOD STRUCTURAL PANEL WITH 10d COMMON NAILS AT 2" O.0 AT EDGES AND 12" O.0 AT FIELD (TABLE 23-11-1-1 UBC) .........7.70 PLF L L 1 /2"(OR 15/32) STRUCT. I WOOD PANEL WITH 10d COMMON NAILS AT 2" O.0 AT....870 PLF EDGES AND 12 O.0 AT FIELD (TABLE 23-11-1-1 UBC) NOTES: A. WOOD STRUCTURAL PANEL: MATERIAL APPROVED BY APA, PFS/TECO OR PITTSBURG TESTING LABORATORIES ( THIS INCLUDES OSB) THESE VALUES ARE FOR DOUG-FIR LARCH OR.SOUTHERN PINE, OTHER LUMBER SPECIES MAY DIFFER IN SHEAR CAPACITIES. B. PROVIDE 2X BLOCKING AT HORIZONTAL WOOD STRUCTURAL PANEL PANEL JOINTS. C. WHERE WOOD STRUCTURAL PANEL IS APPLIED ON BOTH FACES OF WALL AND NAIL SPACING IS LESS THAN 6" O.C, PANEL JOINTS SHALL BE OFFSET TO FALL ON DIFFERENT FRAMING MEMBERS OR FRAMING SHALL BE 3X OR WIDER AND NAILS STAGGERED ON EACH SIDE. D. FOR SHEAR WALLS A TO Z6 USE THE FOLLOWING: 1) USE 3x MUDSILL 2) USE 3x MEMBER @ PANEL JOINTS & HORIZONTAL BLOCKING 3) NAILINGS SHALL BE STAGGERED E. 10d SHORT BOX NAILS MAY BE USED IN LIEU OF 8d COMMON NAILS @ SHEAR WALLS ONLY. F. 2" x 2" x 3/16" STEEL PLATE WASHERS ARE REQUIRED ON EACH ANCHOR BOLT. (UBC SECT. 1806.6.1) HORIZONTAL: ALL ROOF AND FLOOR SHEATHING TO BE EXPOSURE I OR EXTERIOR (TABLE 23—II—E-1 AND 23-11—H UBC) ROOF: JOIST SPACING EQUAL TO OR LESS THAN 24" O.C: 15/32"WOOD STRUCTURAL PANEL P11 24/0, WITH 8d's AT 6" O.0 AT EDGES AND BOUNDARIES, 12" O.0 FIELD. NEW ROOF SHEATHING: 1 /2" CDX PLYWOOD, P.I. 32/16 NAIL w/ 8d AT 4" o.c. BOUNDARY 6" o.c. EDGES 12" o.c. FIELD SEE Sal FOR PLYWOOD LAYOUT DIAGRAM NEW ROOFING CLASS A' ASPHALT SHINGLE ROOFING FLOOR: * JOIST SPACING EQUAL TO OR LESS THAN 16" O.C: 1 1/8" WOOD STRUCTURAL PANEL T&G SHTG, Pii 32/16, w/tOd's AT 6" O.0 AT EDGES AND BOUNDARIES, 10 O.0 FIELD. JOIST SPACING EQUAL TO OR LESS THAN 20" O.C: 1 /8" WOOD STRUCTURAL PANEL T&G SHTG, PII 40/20, w/lOd's AT 6" O.0 AT EDGES AND BOUNDARIES, 10 O.0 FIELD. JOIST SPACING EQUAL TO OR LESS THAN 24" O.C: 1 1/8" WOOD STRUCTURAL PANEL T&G SHTG, Pll 48/24, w/tOd's AT 6" O.0 AT EDGES AND BOUNDDARIES, 10" O.0 FIELD. N E: 1. EXIST'G FRAMING IS NOT PART OF THESE WORK. NEW ROOF MATERIAL MUST MATCH EXIST'G. 2. ROOF DIAPHRAGM NAILING TO BE INSPECTED BEFORE COVERING, FRACE GRAIN OF PLYWOOD SHALL BE PERPENDICULAR TO SUPPORTS. 2. CONECTORS AND FASTENERS SHALL BE INSTALLED IN ACCORDANCE WITH 2O01 CBC CHAPTER 23, DIVISION Ill. INDICATES SPAN AND DIRECTION OF ROOF JOISTS AND RAFTERS INDICATES SPAN AND DIRECTION OF FLOOR JOISTS & ROOF DECK INDICATES SPAN AND DIRECTION OF CEILING JOISTS INDICATES SPAN AND DIRECTION OF DECK JOISTS (SLOPED AS REQUIRED) 0 2X4 AT 16" O.0 { 8 2X6 AT 16" O.0 2X6 AT 24" O.0 DE 2X8 AT 12" O.0 E 2X8 AT 16" O.0 EE 2-2X8 AT 16" O.0 2X8 AT 24" O.0 2XIO AT 12" O.0 Q 2XIO AT 16" O.0 JD 2X10 AT 24" O.0 (2)2X10 AT 16" O.0 Q 2X12 AT 12" O.0 IS 2X12 AT 16" O.0 0 2X12 AT 24" O.0 Pj 1 3/4 x 11 7/8" ML. 12" O.0 ACALIFORNIA FRAMING PROVIDE 2x8 @ 24" O.0 M=L INDICATES (1) 1 3/4" x 11 7/8" MICROLAM P=L (OR PSL) INDICATES PARALLAM LFA. = LOAD FROM ABOVE HEADERS AND BEAMS, REFER TO ENGINEERING CALCS. INDICATES INTERIOR BEARING WALL. NOTE: APPLY SHEAR PRIOR TO FRAMING OF PERPENDICULAR WALL AND/OR BOX -OUTS. (WHERE APPLICABLE) No INDICATES MOMENT FRAME SOLE MARK: PLATE NAILING LEGEND DESCRIPTION SPN4: 16d SOLE PLATE NAILING @ 4" O.C. SPN3: 16d SOLE PLATE NAILING @ 3" O.C. SPN2: 20d SOLE PLATE NAILING ® 2" O.C. (PER DIRLLED HOLED) SPN1: 1/4"X5" LAGSCREW @ 4" O.C. (PER DIRLLED HOLED) NOTE: USE 2-2x10 @ 12" O.C. UNDER "HVAC" DBL. JOIST @ 2ND FLOOR FRAMING WHERE WE HAVE WALL CEILING JOIST SCHEDULE SIZE SPACING MAX. SPAN 2x4 16" o.c. 8'-O" 2x6 16" o.c. 13'-0" 2x6 12" o.c. 15-0" 2x8 16" o.c, 17'-6" 2X8 12" o.c. 19'-6" 200 16" o.c. 22'-0" 2x10 12" o.c. 24'-0" CUTTING AND NOTCHING BORED HOLES STUD STUD STUD STUD 5/8" MIN. 518" MIN. NOTCH NOTCH C BORED HOLE E30RED HOLE --� 2x4 STUD 2x4 STUD 2x4 STUD 2x4 STUD 11/16' MAX. 1/8" MAX. 1 "i/lfv' MAX. 2 1/8' MAX. 2x6 STUD 2x(o STUD 2x6 STUD 2x6 STUD 2 3116" MAX. 13/&° MAX. 2 3/16" MAX. 3 5116" MAX. 40% ALLOWED 25% ALLOWED 40% ALLOWED ANY WALL 60% ALLOWED NONBEARING PARTITIONS EXTERIOR WALLS AND ANY NONBERING WALL OR BEARING PARTITIONS EACH BORED STUD DOUBLED BORED HOLE NOT PERMTITED IN MORE THAN TWO SUCCESSIVE DOUBLED STUDS CBC. SEC, 2320.11.9 AND 2320.11.10 MAX. ALLOWED NOTCHING AND DRILLIN1J REVISION NO. I DATE fi Y J R. 71, �1 A ji"i 47'�l do" � W�c �i >a� Zw. WC')� U -+ N a 2 Q r U) F Cl) � C Z u rq w zw rr 4 Q m 0 P4 z V z W Ch 0 u 0 r r w o u=a �e DRAWN BY: J&R Int'i, Inc. CHECKED BY: J&R Intl, Inc. DESIGNED BY-J&R Intl, Inc. DATE 01/31/05 SCALE AS NOTED JOB NO 04-153 FILE NAME: S2 DRAWING S2 OF SHEETS THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN AS AN INSTRUMENT OF PROFESSIONAL SERVICE IS THE PROPERTY OF J&R INTERNATIONAL, INC. AND IS NOT TO BE USED IN WHOLE OR PART FOR ANY PROJECT OTHER THAN THE ONE IDENTIFIED HEREIN WITHOUT THE WRITTEN AUTHORIZATION OF J&R INTERNATIONAL, INC. THIS DOCUMENT SHALL NOT BE REPRODUCED OR MODIFIED IN ANY WAY WITHOUT THE EXPRESSED WRITTEN CONSENT OF J&R INTERNATIONAL, INC. PLOT DATE: 08/19JO5 GENERAL, CONTRACTOR TO VERIFY ALL DIMENSIONS, DETAILS AND LOCATION OF EXISTING UTILITIES BEFORE START OF WORK ANY DESCREPANCIES BETWEEN PLANS AND FIELD CONDITIONS MUST BE BROUGHT TO J&R INTERNATIONAL, INC. ATTENTION IN WRITING PRIOR TO START OF CONSTRUCTION. DO NOT SCALE THE DRAWING (E) (N) NOTE: PROVIDE CONTINUOUS SPECIAL INSPECTION EQ. EQ. BY A CERTIFIED DEPUTY INSPECTOR FOR EA. SIDE EQ. EQ MST48 (2)2x TOP PLATE ANCHOR RODS. --SIMPSON ST22 SIMP. A34 4x4 POST PER PLAN THE INSTALLATION OF ALL EPDXY GROUTED E3M PER PLAN (E) 2-2xPLATE @ 48" O.C_ NEW EXISTING U.N.O. ------------- EL_ 11 t # If _�l SIMPSON A35 - --------- 2-*4 DOWEL5 LA TOP PLATE FLUSH RIDGE BM E4 (2)51MP5ON T622 SIMP. A34 _/ HEADER (5E PLAN) OR BOARD 2x RAFTERS EA. SIDE EA- SIDE MST 48 (N) 2-2xPLATE (SEE PLAN) 44 POST ALT. LOCATION -A T KING P05T SIMP. CB PROGRESSIVE (3)16d's TOE NAIL NAILING EA- SIDE OF HEADER (2)SIMPSON T522 EA. SIDE 4 : 4' LUS, TYP. iq ' ]w -"2 TRIMMER PER PLAN I -El I E�:l i I�E�l i 2#4 EA. WAY 4.SIMPSON 435 24" MIN, 80 9/16" dia. HOLE AND INSTALL W1 5IMP50N SET EPDXY 18" ADHESIVE PER BM OR WALL, PER PLAN (E) STUDS (E) STUDS (E) STUDS NOTE LC.BO. NO. 5219 -L%- - t_2x5lLL SPRAY BONDING: AGENT (INTRALOK OR SIMILAR) 2xSTUD w/16d NAILS AT THE JOINT BETWEEN OLD AND NEW CONCRETE @ 4" O.C. PRIOR TO POURING: NEW CONCRETE. KING POST SCALE 20 PAD FOOTING SCALE 16 CONNECTION SCALE 12 FULL HEIGHT STUD SCALE RAFTER TO SCALE 5 NEW CONC. FIG. SCALE CONNECTION N.T.S. N.T.S. DETAIL N.T.S. CONNECTION N.T.S. FLUSH RIDGE N.T.S. TO EXIST FTG. N.T.S. 2x ROOF RAFTER (N) SHT'G NOTE: NOTE: B.N. PROVIDE CONTINUOUS SPECIAL INSPECTION PROVIDE CONTINUOUS SPECIAL INSPECTION EDGE NAILING BY A CERTIFIED DEPUTY INSPECTOR FOR IMP. A35 THE INSTALLATION OF ALL EPDXY GROUTED BY A CERTIFIED DEPUTY INSPECTOR FOR THE INSTALLATION OF ALL EPDXY GROUTED O.C. CALIF. 2x BLK'G W/E.N. ANCHOR RODS. I ANCHOR RODS- FRAMING WHERE H2OCCURS 2x RR PER PLAN SIMPSON H2 @ 32" O.C.#3 TIES tv 16' O.C. B.N, @ 24" O.C. ROOF SHT'G. (N)SIMP_ (N) 2xR.R­ ROOF SHT'G, A. WAY. (ALT. USE W.W.11.) SIMP. A35 SIMPSON A35 (E)5LA OR TS @ 48" O.C. EXISTING FOOTING 4x POST PER PLAN 16d S.P.N. METAL 435 FROM R.R. AT 16" O-C 4 FOOTING FLASHING TO PLATE2X C.J PER PLAN 2x FIRE BLK'G. 6" 18" SILL PLATESIMPSON PHD2 W/(2)3/4"4 DIA. B.N. W/ 16d 8" O.C. 2& GA. MIN. E.N. W/4-16d NAILS @ --------------------- - BOLTS TO POST I I 2X BLK'6 CONT. *+ EACH SIDE (TYP) ++ WHERE OCCURES fN)2xrb PLATES -16d BLOCK 5 -(E) 2x ROOF EDGE NAILING RAFTER 14 (N) 2x 5LK. PLACE DIAGONAL 2-2x4 TOP PLATE cod2x JOIST OR Sllro' did. HOLE • @ TOP PLATE ROOF SHEATHING ALONG TO DBL 2x& PLATES PER LEDGER, (SEE PLAN) FOR NAILING AND NAIL W1 �> SHEAR PANEL 2-16d AS SHOWN PLAN HDIR OR BM. WHERE OCCURS (N)5LAB WALL OR BEAM q - -J4J- PLYWOOD ABOVE HDR 04 DOWELS & 24" o/c va" HVA wl SPECIAL INSPECTION PER PLAN UNINTERRUPTED 5/8" DIA. ALL ----- NSTALL W/ SIMPSON SET EPDXY PER PLAN NSTALL WI SIMPSON SET EPDXY ADHESIVE PERTHREADED ROD ADHESIVE LC.BO. NO. 5279 NO. 5219 2" EDGE DISTANCE REO'D NOTE SPF;;-'4Y BONDING AGENT (INTIRALOK OR SIMILAR) AT THE JOINT BETWEEN OLD AND NEW CONCRETE PRIOR TO POURIN6% NEW CONCRETE. CONNECTION SCALE 21 SHEAR TRANSFER SCALE 17 SHEAR TRANSFER SCALE 13 CALIFORNIA SCALE 10 EL DETAIL SCALE 6 CONNECTION SCALE 2 DETAIL N.T.S. N.T.S. N.T.S. FRAMING N.T.S. N.T.S. DETAIL N.T.S. (3) 16d TOE NAIL TO 2X FIRE BLOCKING (PER NOTE) 16d'S @12" OC, STAGG, THRU STUD(TYP.) ROOF PLYWOOD SHT'G_ 2x BLK'G.2' x 2* x 3/1&' WASHERS HEADER PER PLAN W/ 8d's 0 6" O/C -2x4 FLAT 2X TRIMMER �SIMP. TS9 0 48"O.C, U.N.O. @ 48 O.C, STUD U.N.O. ROOF SHT'G. E_N_-j —2, FIRE BLK'G 3-16d COLD JOINT AT 2 POUR 12" MIN. BLOCKEDNAILS SLAB ON GRADE -c-­E. N. 24" MIN, UNBLOCKED /—DF.P.T. PLATE W1 3-16d (BEE PLAN) 5/0' DIAZ, 12' AB'S BOUNDARY 2x RR NAILS 0 48' O/C MIN. (N) 4x FLUSH 16d @ STUQWALL NAILING (B.N.) PER PLAN SEAM (PEP, PLAN) 6" O.C. (N) SIMP. A34 RAFTER OR X HEAR BLK'G. :��'���Rlfvt JOIST CLEAR MIN. EA. SIDE TRUSS TOP @ 48" O_a_ B. N. OF BEAM CHORD FIELD --SIMP. TS9 NAILING (TYP.) SIMPSON A-35 DOUBLE TOP @ 24" O/C U.N.O. RAFTERS PARALLEL @ 48"O.C. PLATES <#I SEE PLAN TO WALL RAPTO 2x STUDWALL PER PLAN NATURAL GRADE z OR APPROVED 4-16d SIDE z per Stud :�:_ - / COMPACTED FILL LAP & SPIKE TYP. EDGE SECTION 00 wl 4-16d < z - 60 NAILIING (E.N.) ROOF SHT'G. ROOF SHT'G. NOTCH *4 0 16' O.C. NOTES: _(N) 4x BEAM CN OR WALL (PER PLAN) BOUNDARY NAIL 1. FOR NONBEARING WALLS USE 1/2" DRILLED ANCHORS AT ji AROUND ALL 4'-0" O.C. PER ICBO 1372. END DISTANCE = 6", A OPENINGS EMBED 3" MIN. z T1. 1 X 1 FLAT I 2. PROVIDE 2X STUD FIRE BLOCKING AT 8'-0" O.C. MIN. 2x BLOCKING 4 FOR nDF1[,11fANDU' Q17rQ An I nPATInNIQ SEE 01 PLANS SIMPSON LU w/ 16d \ / 3-16d 24, (2) 04 T/B MIN., TYPICAL NAILS 12" 6 ALL CONT. FOOTINGS, UN 0 @ 4- FOR BEARING WALLS AND SHEAR WALLS SEE STRUCTURAL RAFTERS PERPENDICULAR EDGE BLOCKING PLANS. ALTERNATE TO WALL WHEN SPECIFIED PLAN VIEW 2x4 FLAT 5, FOR SIZE OF TRIMMERS SEE PLAN, 2-2x MIN. ON PLAN @ 48 O.C. TYPICAL STUD SCALE 2-22 CONNECTION SCALE 18 ROOF TO WALL SCALE 14 FRAMING MEMBERS ROOF SHEAR TRANSFER & SCALE 7 TYPICAL EXTERIOR SCALE 3 WALL DETAIL N.T.S. DETAEL N.T.S. SHEAR TRANSFER N.T.S. PER PLANS END ROOF RAFTER CONNECTION N.T.S. FOOTING N.T.S. @_ (N) SHT'G BN. TYP U.N.O. NOTE: SEE DETAIL 1 FOR 6 PORTION TO BM. TO BE PLACE FACE GRAIN OF PLYWOOD 24' HOEDOWN REPETITIVE INFORMATION PERPENDICULAR TO FRAMING UNLESS DBE. TOP PLATES MIN. SSTB Selection Table: -IF 3-16d //-NAILS. (TYP) � /-RR. BY - 1 1 /2x3 1 /2 NOTCHED TO MATCH NOTED OTHERWISE. 4x C.X_wl_KHVUT RAFTER SLOPE DIMENSION ,-SIMPSON ST6224 COLD JOINT AT 2 POUR PER PLAN2� NAIL EDGE DISTANCE SHALL BE MIN. 3/8" . . . . . ... . . . . . . . . . . . . . AB ON GRADE E3N. FROM EDGE OF PLWYOOD AND 2 X FRAMING SEE PLAN 8 MEMBER. (3/4" AT 3 X OR 4 X FRAMING MEMBER.) x TYP 7 2-2x TOP PLATES ,rSHEAR WALL MAX. NOTCH PROVIDE BOUNDARY NAILING (B.N.) AT E N. TYP (PER PLAN) 3 DIAPHRAGM BOUNDARIES, CHORDS, DRAG 4 Model- 2X,3X and 2-2X Sill-PL Vono Pour Two Pour HTT16 SSTB 16 SSTB 20 HTT22 SSTB 20 SSTB 24- HD 2A SSTB 16 SSTB 20 HD 5A SSTB 20 SSTB 24 HD 6A SSTB 28 SSTB 34 HD 8A SSTB 28 SSTB 34 HD10A SSTB 28 SSTB 34 v I I TIES, OVER SHEAR WALLS AND WHERE WDUJ. x x DO NOT INSTALLI HTT or MTT A SPECIFIED. HOEDOWNS RAISED OFF THE MUDSILL OFW5 \ / � NOTE: WHERE JOIST LAP/SPLICE SEE FRAMING HOLDOWN ANCHORS RIDGE OCCURS) CCURS AND PLYWOOD E.N.SIMPSON CSIro X1 PLAN. TYP. MUST BE TIED IN BEAM NER 4� a E A. COR 1, ROOF SHEATHING 2x K.S. @ JOINT IS OFFSET, ADD #4 0 16- O.C.% slmp� PLACE PRIOR TO Ek/S W/ 2 X 4 OR 3 X 4 NAILER AS a \ SSTB FOUNDATION 2, 2x ROOF RAFTER L BEAM PER PLAN) SHOWN: BOLT INSPECTION. 3. WALL OR BEAM PER PLAN 16 d's @ 16d @ 12" O.C. NATURAL GRADE 4. 2x FRAMING 3 12" O.C. APPROVED AS REQUIRED TO POST OR t DEEPEN FOOTING .4 5. EDGE NAILING @ TOP PLATE x RAFTER w/SLOPE PER PLAN COMPACTED FILL r 6. SIMP, A35 @ 24" O'.C, OBTAIN ANCHOR T CEILING JOISTS PER PLAN (PER PLAN) # x_ EMBEDMENT & 2x BLOCK @ 48" O.C. CONCRETE COVER. UN.O SHEAR TRANSFER SCALE 23 BEAM NOTCH @ SCALE 19 SHEAR TRANSFER SCALE 15 PLYWOOD LAYOUT SCALE SPECIAL SHEAR AT SCALE 8 SIMPSON HOLDOWN SCALE 4 N.T.S. WALL DETAIL N.T.S. N.T.S. DIAGRAM N.T.S. WINDOW OPENING N.T.S. W/SSTB N.T.S. I REVISION I NO. I DATE g� N rP 4� ` INP'i �­V 00 Z Cn C4 Z z ix 0 ab ir- z CL ON Z < 0 0 U 0 0 z P-4 vi 0 0 P4 Z C) U U 0 0 )..t w w w w z U) DRAWN BY: J&R Int), Inc. n I Inc. DESIGNED BY: J&R Infl, Inc. DATE 01/31/05 SCALE AS NOTED JOB NO 04-153 FILE NAME. SD1 DRAWING SDI OF SHEETS m IT THIS DOCUMENT, AND -IMF IDFAS AND DFSICTNS INCORPORATED HEREIN AS AN TNSTRIJMENT 01, PROFFSSIONAL SERVICE ISTHE PROPERTY OF J&R INTERNA'11ONAL, INC. AND IS NOT TO BE USED IN WHOLE OR PART FOR ANY PROJECT OTHER THAN THE ONEIDENTIFIEDHEREIN WITHOUTITiF WRITTEN AUTHORIZAT]ION OFJ&RINTFRNAIJCNAL,TNC. THISDOCUMENT S.HAIJ,NOTBFRFPRODUCE-DORMOD*ln-)IN AN)*VAYWITHOUTTHE t-XPRFSSEla C0jjqq`T OEJ#6&9 L, INC. PLOT DATE: 08/19/05 GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, DETAILS AND LOCATION OF EXISTING UTILITIES BEFORE START OF WORK ANY DESCREPANCIES BETWEEN PLANS AND FIELD CONDITIONS MUST BE BROUGHT TO J&R INTERNATIONAL, INC. ATTENTION IN WRITING PRIOR TO START OF CONSTRUCTION. DO NOT SCALE THE DRAWING L Mandatory Measures Checklist: Residential (Page 1 of 2) MF-1 R Certificate Of COMDliance: Residential (Part 1 of 2) CF-1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION instructions: Check or initial applicable boxes or enter N/A if not applicable. DESIGNER ENFORCEMENT Building Envelope Measures r_V_1 I IAI 150(a): Minimum R-19 ceiling insulation. rV_1 150(b): Loose fill insulation manufacturer's labeled R-Value, lAl F�-j­l * 150(c): Minimum R-1 3 wall insulation in wood framed walls or equivalent U-value in metal frame walls (does L,�\J not apply to exterior mass walls). 150(d): Minimum R-13 raised floor insulation in framed floors or equivalent. 150(l): Slab edge insulation - water absorption rate no greater than 0.3%, water vapor transmission rate no El greater than 2.0 permfinch. FV_1 118: Insulation specified or installed meets insulation quality standards. Indicate type and form. I^ I - - -------- FV] 116-17 : Fenestration Products, Exterior Doors and Infiltration/Exfiftration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration products (except field fabricated) have label with certified U-Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. 150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. 150(f): Special infiltration barrier installed to comply with Section 151 meets Commission quality standards, ❑ 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs, 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allowed. Space Conditioning, Water Heating and Plumbing System Measures ;�] r 110-13: HVAC equipment, water heaters, showerhead sand faucets certified by the Commission. IJ1L\J FX1 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. JAI 160(i): Setback thermostat on all applicable heating and/or cooling systems. [VI150{j): Pipe and Tank Insulation IAI 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R-12 or greater. 2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater) 3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-1 2 external insulation or R- 16 combined internal/external insulation. 4. All buried or exposed piping insulated in recirculating sections of hot water systems. 5. Cooling system piping below 55 degrees F. insulated. 6. Piping insulating between heating source and indirect hot water tank. EnergyPro 3.1 By EnergySoft User Number: 2299 Job Number: 050834 Page:5 of 14 NOTE Lownse residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION instructions: Check or initial applicable boxes or enter N/A if not applicable. DESIGNER ENFORCEMENT Space Conditioning, Water Heating and Plumbing System Measures: (continued) FV_1 150(m): Ducts and Fans 1. Al ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601, 603, 604 and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system that meets the applicable requirements of UL 18 1, UL 18 1 A, or ULI 81 B. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross -sectional area of the ducts. 3. Joints and -seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such a tape is used in combination with mastic and drawbands. 4. Exhaust fan systems have back draft or automatic dampers. 5. Gravity ventilation systems serving conditioned space have eitherautomatic or readily accessible, manually operated dampers. 6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. 114: Pool and Spa Heating Systems and Equipment 1. Certified with 78% thermal efficiency, on -off switch, weatherproof operating instructions, no electric resistance heating, and no pilot. 2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or spas. a. At least 36" of pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch, FV__1 IA 1 115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light. (Exception: Nan -electrical cooking appliances with pilot < 150 Btu/hr) 11 118 (f): Cool Roof material meet specified criteria Lighting Measures F1150(k) 1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 lumens/wau or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting control panel at an entrance to the kitchen. El150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternative to this requirement allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved. 3.1 By EnergySoft User Number: 2299 Job Number: 050834 Paqe:6 of 14 GUERRERO RESIDENCE ADDITION 8/19/2005 Project Title Date 2205 S. Parton Street Santa Ana Project Address Building Permit # AR INTERNATIONAL, INC. (714) 774-3528_ Plan Check / Date Documentation Author Telephone Computer Performance 8 - Field Check/ Date Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only GENERAL INFORMATION Total Conditioned Floor Area: Total Conditioned Slab Area: Building Type: (check one or more) Single Family Detached F1 Single Family Attached I❑I Multi -Family 1,400 fe 600ft 2 Average Ceiling Height: 8.0 ft FlAddition F1 Existing Building Fv-1 A❑I Existing Plus Addition Front Orientation: (West) 270 dect Number of Dwelling Units: 1.00 Number of Stories: 1 Floor Construction Type: [j] Slab Floor Const. Component Frame Assembly Location/Comments lype Type U-Value (attic, garage, typical, etc.) Default Floor Prior To 1991 Wood 0.098 Exterior Floor / Over Grawlsr)ace (w/R-6 Credit) Default Wall Prior to 1978 W ood 0,385 Exterior Wall Default Roof Prior to 1978 Wood 0.047 Exterior Roof Slab On Grade n/a 0156 Covered Slab w/R-0.0 Perimeter Insulation R-13Wall (W.132M.16) W ood 0.088 Exterior Wall R-30 Roof (R.30.2x6.16) W ood 0.035 Exterior Roof FENESTRATION Shadina Devices Type Orientation Area Fenestration Exterior Overhang Side Fins (SF) U-Egg_t!2r SHQQ Shading Yes Z No Yes / No Front (West}_ 10-0 1.28 0.83 Bua Screen_ n nx El Fx] Left (North) - 64.0 0,60 0,65 Bug Screen 11 nx 1:1 E Rear (East)_ _12D 1,28 0.83 Bua Screen F] Fxl El nx Right (South) 24.0 128 0.83 Buq Screen xn El Fxl Rear (East) 6.0 0.60 0,65 Bua Screen 1:1 FX1 El 0 Right (South) 36.0 0.60 11 Bug screen 1:1 Fx] 1:1 E F] F1 n F1 F1 F] n 1-1 n 1:1 ❑ F] F] F1 FI El F] n n El El El El Bun laitiation Tirne : Oa(19JD5 12:26:52 Run Code: 11 24479612 Ener I QvPv ro 3.1 BEnerSoft Q . v User Number: 2299 Job Number: 050834 Page: 3 of 14 III GUERRERO RESIDENCE ADDITION 8/19/2005 Project Title Date HVAC SYSTEMS Note: input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load, Distribution Heating Equipment Minimum Type and Duct or Type (furnace, heat Efficiency Location Piping Thermostat Location pump, etc.) (AFUE/HSPF) (ducts, attic, etc.) R-Value Type Comments Gravity -Wall Furnace 60% AFUE DmQdesc,/ No Fan n1a NoSetback Existing System Gravity Wall Fuuwze- 63% AFUE Di ictles-z I/ with Fan --mla- No Setback New System Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location heat pump, evap. cooling) (SEER) (attic, etc.) R-Value Type Comments No Cooling 10 0 SFFIR Ducile s n1a No Setback - Ex-istina.System No Conlin c --- 111A_ q 10 0 SFFR Dt No Seffiank - Wewq�tstern WATER HEATING SYSTEMS Rated Water Heater Water Heater Distribution # in Input System Name Type Type Syst. Btu/hr Tank Energy Facti 1 External Cap. or Recovery Standby Tank Insul. (aah Efficiency Loss (%) R-Value 1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input and Recovery Efficiency. REMARKS COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply With Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business &Professions Code) Documentation Author Name: Name: Jose L Justiniano Title/Firm: JORGE GUERRERO Title/Firm: J&R INTERNATIONAL, INC. Address: 2205 S. Parton Street Address: 2115 W. Crescent Avenue, Suite 252 Santa Ana, CA 92707 Anaheim, CA 92801 Telephone: (714) 979-7917 Telephone: (714) 774-3528 Lic. #-. 08/19/05 08/19/05 (signature) (date) (signature) (date) Enforcement Agency Name: Efrain Olivas Title/Firm: ADVANCED TITLE 24 Address: 1235 N Harbor Blvd, Suite 235, Fullerton Telephone: (714) 525-9824 08/19/05 lEneravPro 3,1 By EnerQVSoft User Number: 2299 Job Number: 050834 Page:4 of 14 1 ­g 0 r J ON Z < Z ;.T, Z 00 U C,4 ia IL F_ 0 Z 0 �4 01� U a 0 0 0 0 in Z W it 0 a 0 RS C) 0 P4 Z Ch F- W W W Z rn 0 DRAWN BY: J&R Int'l, Inc. CHECKED BY: J&R Int'l, Inc. DESIGNED BY: J&R Intl, Inc. DATE 01/31/05 SCALE NONE JOB NO 04-153 FILE NAME: EN-1 DRAWING N...l OF SHEETS THIS DOCUMENT, AND THE IDEAS AND I)FSIGNS INCORPORATED HEREIN AS AN INSTRUMENT OF PROFESSIONAL SERVICE IS THE PROPERTY OF J&R INTFRNATIONAL, IN(. ANT) IS NOT TO BE USED IN WHOLE OR PART FOR ANY PROJFCT OTHER THAN THE ONEIDENTIFTED HEREIN WFITIOUTTHEWRITTEN AUTHORIZATIONOFJ&R IN-FERNATIONAL,INC, THISDOCUMENT SfiAII,NOTBERFPRODUCFDORMOI)IFIF�DINANYWAY VATHOUT-I'HEFXPRFSSFDWRITTTNCONSFNTOFJ&RINTI,--RNAUONAI.,,fNC. PLOT DATE 08/19/05 GENERAL CONTRACTOR TO VERIFY ALL DIMENSIONS, DETAILS AND LOCATION OF EXISTING UTILITIES BEFORE START OF WORK ANY DESCREPANCIES BETWEEN PLANS AND FIELD CONDITIONS MUST BE BROUGHT TO J&R INTERNATIONAL INC. ATTENTION IN WRITING PRIOR TO START OF CONSTRUCTION. DO NOT SCALE THE DRAWING