Loading...
HomeMy WebLinkAbout10151101.pdfP SPECIFICATIONS CODE DATA 1_36 Max. stud height is 10' for bearing walls, max. 14' for NOTE- If conflict with notes on plans, most restrictive non bearing 20, fire block at mid "on. requirements would govern. Where plates or sole plates are cut for pipes, is 2x4 light framing to be stud grade. stropl-1/2* wide by 24' long by 1/8* thk. shall be Joist and rofters to be No.2 D.F.(Doug Fir), -larch. fastened across the opening with 16d nails on each tide, Booms, stringlersond headers to be NoA D.F.-torch. Posts and timbers be No.1 D.F.-larch. 3-al Roof shoolrfng:1/2*CDX Structural I plywood or APA rated Unless otherwise specified, timber shall be Doug Fir and O.S.B.B.N: 8d 06*o.o., EN: Od 06a.a.; and FN.: 8d 012'o.c. shall conform to W.C.L.I.B. u.o.n. at roof framing plan. Standard Grading and Dressing Rules. Floor shooting: 5/8' T&G COX Structural I Plywood or I b ALL WORK CONFORM FOLLOWING CODES: APA rated O.S.8: B.N.- 10d Wo.c., EN*10d 06*o.c., and FN. 10d 010"o.c. Use ring shank nails and glue plywood Uniform Building Code. CA Building Coda. A ri, to framing according to manufacturers specification. Uniform Mechanical Code. CA Mechanical Code, Uniform Plumbing Code. CA Plumbing Code. Uniform Electrical Code. CA Electrical Code. HO Provide double floor joist under all parallel partitions, solid block joist under walls and bearing points, ALL STRUM umn & Local 41 Floor joist framing from. opposite sides of boom, girder boom/beam, boom/co column/foundation must be positively ordinances ril or partition shall be lopped at least 3*or the opposing connected with Simpson or equivalent joist shall be tied together in on approved manner. connectors regardless of lock of connection N I detailing on plans. Standard connections u.o.n. 4-21 Provide 05/8' anchor bolts embedded 7* into concrete Simpson or equivalent: beam/column "CC*. F or masonry 0 Wo.c. min. 2 bolts per plate, one bolt boom/beom-*HUFf ". column/pod footing -'CB" within 12* of plate end and corners. NOTE: Bolts shall M Combination florescent light/vent fan, extend 5* into footing on two (2) pour system (extra capable of 5 air changes/hour, at now long bolts). Use 3/16 thk. X 2' sq. plate washers. 6A1, interior bathrooms, or add where exterior f4_31 Provide reinforcing steel bathroom window is removed. in slob. Min. depth of footing below natural grade and width of 17771 Water closets-, 1.6 GPF 4 r Shower heads: 2.5 GPM F441 footing. t2*xl2* supporting one story structure; and min. Laundry Faucets: 2.2 GPM 15* wide x18* deep for two story footing, u.on.. Sink Faucets: 2.2 GPM n4 7/8* stucco siding. E5 Uss type V cement for high sulfate soilsAnW' psJ.,u.o.n. Footing should be examined by the Building Inspector 1x lop or vertical siding over 1/2" cdx plywood. Prior to cOncr'Ote Pour. Ali special bolting and shear hardware to be tied in place. n47Provide stucco base screed. 4n8 Foundation supporting wood shallextend at least 6"obove n7 mass, the adjacent finished grade paying or sidewalk. r--1 Attic ventilation 1/150 of attic area sq, ft.. n49 Footing shall be provided under all bearing wall*. Mox.144 sq. inches in fire hazard OreaP 50 Plywood shear wall shooting: 1/2" CDX Structural I 3 tab class 4A" fire rated shingles 0/15 # felt and plywood or APA rated B.N.: 8d 06"o.c., EN: 84 Wo.c., 9 over 2 layers 15 # felt for 3/12 pitch or less. ICBO 0 and FN. 8d 012*o.c. u.o.n. on framing plan 10 Tile roof. 61b./sq.ft/0/30 # felt-/CBO ER4660 ES-ER-51443 n5i All second floor shear wells shall property be attached to the roof diaphragm, ❑11 All hose bibs are required to be protected with a 521 All glazing shall be duel glazed unless otherwise permanently attached anti -siphon device, Min. 1 hose recommended by certified energy report. bib required front and book. Provide R-13 in the exterior walls, R-19 in wood floors Ground fault interceptor protection (GFI) for all exterior over non living areas. provide R-30 in the roof or ceiling 12 receptacles, in bathrooms, in unfinished unless otherwise recommended by certified energy report, basements/crow{ spaces, in garages and at counter tops; in kitchens or at bar sinks. [5-4] Dryer vent shall be 04* smooth round metal, max. length of 14" with 90' bonds. Any deviation shall be R3Switched light fixture in every habitable room, engineered and approved by Mechanical unit. bathroom, stairway, hall, attached garage and at n55 AM epoxy installations require special inspection, u.o.n. outdoor entrances. M RProvide 2 GF1 protected -exterior receptacles, one at Provide at least one window or exterior door approved the rear of each dweling unit. for emergency egress or rescue for every room used for sleeping purposes and at basements. This window or n15 Outlets are required for kitchen counter space 12' and opening must have a clear net open able dimension of wider in such a manner that no point along the wall is 24" high and 20" wide AND total 5.7 sq, ft.. The max. vam more than 2' from outlet or more than 4' for island finished sill height is 44" above floor. and peninsula counters. [ 571 Fluorescent lights rated at not loss than 40 lumens/watt n16 Outlets for wall spaces 2' and wider at maximum for general lighting in kitchens and bathrooms. 0 12*o,c. so that no point along a wall, fixed glass, or TOTAL S �1­1 guard rail is more than 6' from outlet. 581 HEATIM §)IXM IN ATTIC. Attic access mIn.30*x30*not over 20' from equipment. Unobstructed passage 240wide F171 A dedicated 20 omp branch circuit for bathroom with solid continuous flooring from access to receptacles is required, equipment/control panel. A level, unobstructed work platform min. 30* in front of equipment with 3.0" 4* thk. concrete landing 1' below threshold headroom. Light over equipment With switch at access. min.36*x min.36* wide or full width of d*or(s) or full Air supply openings of 2 sqin./1,000 BTU for blower width of patio doors, or French doors. types and 7 sq.in./1,000 BTU for gravity food type. -4 RWater heater will be securely strapped to wall with two NOTE: *Required swimming pool/spa fencing must be + ti straps. One within 1/3 of top and 1/3 of bottom. F591 +I Elevate water heater min.18* above garage door on I hr. maintained during construction or the pool/spa shall be pedestal. emptiod."(117 APPLICABLE) n2O Required swimming Pool/spa fencing must be maintained 60Radiant barrier required in climate zones 2,4,8-15. during construction or the pool/spa shall be emptied. Required this submitting. YES.,.` NO- UO sible from the street. The discharge of pollutants to any storm drainage system, R21 Provide house street number vi Numbers shall be of non combustible materials in Very Fe 11 is prohibited. No oil waste, petroleum byproducts, soil High Severity Zones. particulate, construction waste materials or waste water generated on construction sites or by consruction R22 Provide attic access 22"x30"> readily accessible with activities shall be placed, conveyed or discharged into E�_Svwr I 0� IN q -tip min.30* clear head room. the street, gutter or storm drain system. 2_31 Provide approved smoke detectors. Additional info shoot 1, Q Approval must be obtained and/or fees paid to following R24 Showers shall be finished 70" above drain with materials agencies. This information should reach the project owner not adversely affected by moisture. or other individual with authority to act on it and it Al should reach them as early as possible in the plan review process. PS Anti scolding shower and tub and shower valves are City Planning Division Zoning Clearance required and shall be of pressure balance or School Fees errrios a ic. Mixing valve type. Soc.4tv., UPC. L vN Other 6 Access Pane( (12*xl2*) required for tub strop slip -joint ] or use non -slip (welded) joiint. Exterior loth: Provide two layers of Grade D paper over A, N N"Ny(� 11-31VIS1 r-INN all wood base sheeting. (CBC 2506.4) P7 Stucco loth and drywall shall be nailed to studs and top -bottom plates. r6-41 Provide a weep screed for stucco at foundation plate line MASTER F min.4* above grade. (CBC 2506.5) f2alSafety glazing is required at wardrobe doors, shower doors and windows at both tubs and showers and within 2' of 651 Tempered •patio doors or French doors -low *E'-dual .4 F doors. pone. 29 (TYP) strop new wall to existing at top plate with ST Provide Approved spark arrestor at fireplace chimney. 'ED n_30 Wall between house living area and garage (R-3, U�1) 67 Provide A.F.C.I. protection for bedroom circuits. J shall be 5/8' typsX" drywoll, floor to roof sheathing with toped jointis. Ic T-24 POSTINC38 F:tr=auiF;tr=-D P'�_AN' 31 Door between R-3 and U-1, 1-3/8* solid care BYCaNTRACTOR (20 min.) door, self -closing and tight -fitting. a) Contractor shall post the Installation Certificate (CF-6R) DAT form and Insulation Certificate (IC-1) in conspicuous Provide balloon framing, at exterior wall siding on sloping fi 21 location or kept with plan and made available to the ceiling. Inspector. Contractor shall provide copies of: Californiaguide to b) L 33 Provide double top plate with 48* top splices stropped Homo Comfort and Ensavings, CF-IR, MF-IR. With Simpson strop ST6224 CF-SR and IC- forms to ergy building owner. -C) C) An approved HERS provider and certified ratter shall EProvide fire blocking, vertical or horizontal, shelf coform conduct the field verification and diagnostic testing. 4 to UBC sec.708.2 d) Contractor shall provide Certificate of Field verification C" and Diagnostic Testing (CF-4R)i signed and dated by the 00! n35 Studs supporting 3 stories shall be 2x6 or 30 0 16' mc, HERS fatter to Building Department prior to final C", 14) 6 67-2700 Inspection. Please show the following notes on the first sheet of the plan: SMOKE 0ETECTORS Hardwired smoke detectors with a battery backup Ore NATIONAL POLLUTANT DISCHARGE ELIMINATION-SYITEM required. Show oil locations With symbol SO A on PInn 1. In the case of emergency, cal&AkLftVD �WIA at Work Phone 55or Home Hans SDI F2 r:-�RIZOOFA 2, Sediment from areas disturbed by construction shall be retained on site using structural controls NPDE Provide smoke detectors in each hdilwoy leading' tc sleeping rooms, each sleeping room of now and existing to the maximum extent practicable. sediment transport from the site to'streels construction, top of stairway, and in each story. In new treat 3. Stockpiles of soil shall be properly contained to minimizes construction detectors to be hard wired with battery back drainage facilities or adjacent properties via runoff, vehicle tacking, or wind. up. UBC 310.9.1.4. Detectors shall be interconnected to 00 4. Appropriate BMP's for construction related materials, wastes, spills shall be implemented to minimize sound at the some time. r transport from the site to streets, drainage facilities, or adjoining properties by wind or runoff. Detectors ore not to be located in kitchen, garage or 5. Runoff from equipment and vehicle washing shall be contained at construction sites unless treated within 3 feet from door to kitchen or bathroom. Or Ile ir registers. to reduce or remove sediment and other pollutants. 10 N 6. All construction contractor and subcontractor personnel are to be made aware or the required best management practices and good housekeeping measures for the project site and any associated construction LOT AND BUILDING, STATISTICS staging areas. Lot size sq. 51:5,�rzno Mcr 7. At the end of each day of construction activity all construction debris and waste materials shall -4 sq be collected and property disposed in trash or recycle bins. EAstlng garage I A sq. 8. Construction sites shall be maintained in such a condition that an anticipated storm does not carry Usting-living area wastes or pollutants off the site. Discharges Of Material other than stormwater only when necessary for performance and completion of construction practices and where they do not: cause or contribute I st ftoor a&Won sq. ft.. "7 V to a violation of any water quality standard; Cause or threaten to cause pollution, contamination, or P E R N! IT -rY P E nuisance; or contain a hazardous substance in a quantity reportable under Federal Regulations 40 CFR 1 1 7, 1 Aft -, �'! �,_ 3 -U i id or liquid chemicals wastes from Total living area sq. ft.. Parts 117 and 302. Garage wWl*m sq. ft.. , 3-8 9. Potential pollutants include but are not limited to: solid "0 paints, stains, sealants, glues, times, pesticides, herbicides, wood preservatives arid solvents; asbestos Total garig*s), area sq. ft.. fibers, paint flakes or stucco fragments; fuels, oils, lubricants, and hydraulic, radiator or battery '5, r4 s: AJ, fluids; fertilizers, vehicle/equipment wash water and concrete wash water; concrete, detergent or floatable % Building(s) Wand sq. ft.. wastes; wastes from any engine/equipment steam cleaning or chemical degreasing and superchlorinated 0 C a ca, rxoi,,� Actual footprint4and % potable water line flushing. C SI During construction, penriftee, shall dispose of such materials in a specified and controlled temporaryON T R area on -site, physically separated from potential stormwater runoff, with ultimate disposal in accordance with local, state and federal requirements, SHEETINDEX c1c surface erosion is Dma"M SheetNo. 10. Dewatering of contaminated groundwater, or discharging contaminated soils via prohibited, Dewatering of non -contaminated groundwater requires a National Pollutant Discharge Elimination SITE PLAN "'2 System Permit from the respective State Regional Water Quality Control Board. FLOOR PLANS 11. Graded areas on the permitted area perimeter must drain away from the face of slopes at the conclusion .of each working day. Drainage is to be directed toward desilting facilities, ELEVATIONS 12. The permittee and contractor shall be responsible and shall take necessary precautions to prevent TITLE 24, MFR& CFR Forms 47 public trespass onto areas where impounded water creates a, hazardous condition, FOUNDATION PLAN N 13. The permittee and contractor shall inspect the erosion control work and insure that the work is in FLOOR FRAMING PLAN accordance with the approved plans. ROOF FRAMING PLAN NPDES-1 CONTINUED 14, The permittee shall notify all general contractors, subcontractors, material suppliers, lessees, and prop" owners: that dumping of chemicals into the storm drain system or the watershed is prohibited, FRAMING SECTIONS 17. Sediments from areas disturbed by construction shall be retained on site using an effective combination of 15. Equipment and workers for emergency work shall be made available at ail times during the rainy season. erosion and sediment Controls to ft maximum extent practicable, and stockpiles of sail shall be property containted DETAILS Necessary materials shall be available on site and stockpiled at convenient locations to facilitate to minimize sediment transport *am the site to streets, drainage feciftes of adjacent properties via runoff. & o rapid construction of temporary devices when rain is imminent. ELECTRICAL PLUMBING PLANS vehicle tracking, or wind. 16. All removable erosion protective devices shall be in place at the and of each working day when the 18. Appropriate BMPs for construction -related materials, wastes. softs or residues shall be Implemented and retained 5-Day Rain Probability Forecast exceeds 40%. on site to i ining Property by wind or Z minimize transport from the site to streets, drainage hicillitlea, or adjo runoff, . . . ... . . . . . . . - %R If/ul, I A- -i I OCT 2,005 i. SITE PLAN N I SCALE: fI It at At expansive soils, often post tensions slabs ore used; therefore, care must be taken whenever additions are mad* to existing structures, The" post tensioned tendons cannot be severed to place now foundations for additions or remodels without extreme care and engineered design. BY STAMPING, AND SIGNING PLANS, ENGINEER ACKNOWLEDGES, HE HAS FACTORED IN THE RAMIFICATIONS OF POST TENSION FOUNDATIONS. OF M CRAWN DATE SCALE Joe 190. 14 k. 19 NOTE. WHERE 2X MATERIAL IS CALLED OUT--CHEt2( {`1 PLYWOOD ROOF (4 � PLYWOOD ROOF 2X BLK'G A35'S MMY S L J SHEATHING 1�.) SHEATHING 0 24" O/C PLAN{S) FOR 3X MATERIAL 2x ROOF RAFTER 2x ROOF RAFTER 2 2 t. - 2 X 4 STUDS AT Fri O.C. NOTE. 1. - SEE PLAN SEE PLAN � 2. - (2} 2 X 4 TIIP PLJtT�'i ALL GLUE LAM 21 - 5 3 - 2 X D OCKING BEAMS COMBINATION 24F 3. - SPLiCE OVER CENTER OF STUD 2x BLK'G. 7 2x BLK'G. S1I'(P 4, - 2 X C.d'S AT is, O.0 4. - 4` -D' MIN. LAP W/ {40} 16d NAILS P.N. w }� , 5. - 2 X R.R$ AT 16' OC STD. CAMBER, OR ST 6236 4 1 od s'ti 4 1 @6°" �i 5, - FIREBLOCKING AT MIOHK2{T OF ALL i WW TRUSS ERPE'J. 7' - 2 X � RIDGE BOARD WALLS OVER 8 -0' HIGH. 8a. - 4 X _ RIDGE BEAM 12 5 (2) 10D NAILS EACH END OF FIREDLOCKING, 2 2x ROOF SHEAR iF. i TOW L b. - 8 X _ .. ROM BEAM 6, - 7' MIN. INTO CONC. t RAFTER - MI OCCUR'G I W a - X . t;fU LW (R, BM) 7. - 2X STUD &TRIMMER MIN. AT JAMBS SEE PITCH 1 /4" TO 12" 9. - 5/8• PLY CDX T i CA - C.C. PLUGGED MiNG PLAN FOR ADDITIONAL SUPPORT. 8 C.J. SEE PLAN 8 B. - 4 1/6` MIN., 9` MAX. FROM SILL END (HOT MOP.) fO. - 1/2" PLY COX 9. - 2X SiLL W/(2) 16D NAILS EACH END. 11d - 1/2 DRY WALL 10. - (3) 16D END NAILS. g A35 @ 16' O.C. vq�/fA35 16" Q.G. E TYP) b. - 5/8• TYPE X D.W. L:I 11. - ISO NAILS AT 24 MAXIMUM O/C W/(2) 11 1i p � �/ a - STD 5/8 ID. WHERE WS 0 2,C O/C 5 16D EACH STUD 11' -6' OR LESS. rk (3) 6 6 ± _� 12a. - R-13 WALL iNSULA111* tO 160 EACH STUD OVER 11' -6'. 10 i b, - R-19 FLOOR INSULA1%ON 11 - TYPICAL SOLID UNTEL - SEE FRAMING a - R-19 CLG INSUL.ATIO11 3PLAN FOR SIZE f. PLYWOOD SHEATHING 6, A3591$' D.G. PL/ WALL T4 Bt1(G. � T�O. 4 X. 6 X tiiJR. 2X FLAAT FNGR d, - ft-30 ROOF iNSUTATCN ' 1.1 - 5/8' DIA. X 10" ANCHOR BOLTS AT 72' 2. 2 X RF RAF'S 7. 2 X BLKG, W/(2) 160 PER BILK. TO �," 11. WINDOW OR DOOR w/ (2) 1 fiD E.A. 13c• - 2 X 4 SILL PLATE 1 OR SHOT PIN u.o n. SEE PLANS P.T.PLAI E S, ( ) 3. 2 X CLG. JST'S DBL TOP P{.. b, - 2 X 4 SILL r 4 14. - 2X P,T.OT. SILL (OR 3X) SEE PLAN 4. BOUN. NAiL'G 8. DBL TOP PL DRAG TRUSS W/ NAIL 140, 3 TAB t3AS5 A FIRE RATIO SHINGLES 0/15 LB FELT 1 I& - STUD TO SILL. TOE NAIL (2) 10D NAILS / � 5. (7) 16D CJ TO FIRR S. 2 X STUDS Di8" O.C. VAULT 'p A35'S @ 16' O/C W 16 @ b. - -TILE - CLM A FIRE RAZED SHAKE 0/30 LB FELT EACH SIDE (�,�...,J W/M r S lrtiV�sA i7 TO PLATE B 1 a - 1CB0 111 4660 - CLASS A (LIGHT Wr.) > +/ 16. - 2X STUDS AT 18" O/C (u.aa) SEE PLAN � 4 Wit Mob 01 °� � 1& - 7/8 STUCCO 15. - STUCCO BASE SCREEQ t SHEAR TRANSM 17, - PLATEIINE BLOCK'G 1 UST PROVIDE VERIN A71ON AT STUD BAYS t5 into FOR SIZE AND SPRING OF FLOOR JOISTS OR P.N. = PERIMETER NAILING BLOCK'G SAME SIZE & I& - PROVIDE 2 LAYERS OF GRADE PAPER (FELT) OVER PLYWOOD SHEAR WALLS U E. N = EDGE OF PANEL NAILING DEPTH AS JOIST OR 19, - 1 X LAP SIDING O/ 3/8" sTRUCT 1 PLY OR 1 2 CDX UO,N, i RAFTERS (see plan} `Truss supplier shall submit BOUNDRY NAILING (BIN} F N. FIELD iNAILING RAFTER W A35 {9t % (° ) / calculation and sin drawing b a registered ! EACH SIDE, EACH ND. elyll a inear to than a t de ner who EXTERIOR WALL _ , ��: _ _ .__ - -- agrees to revtew the y awM acceptance prw .c -•c ..__tI i NOTE(AS ABOVE) p �I II to fabrication. map drawfi an �i ottone shall be fi� 16 TYPICAL INTERMEDIATE NAILING {FIELD NAILING}(FIN} FLOORS 10d 31 3 . _ _ r ti 1 x RAFTERS( P, submitted to the binding faty divisi fa amp attar the responsible pro t designer natal h ar o=aptance and to • tion. T drawings must t t"� i i�1, " AT 10" O.C. �r� J015T OPEN Ij prior mktpiiance with C 2001 sac' 1 106.3 ROOF 8d AT 12" O.C, {; X ; 'xi2' 'x' ` ; { ;? plans, rat ackuiat and aQe . cat s must be prap d by a 2X4 FLAT BLOCKING AT UNSUPPORTED EDGES W/ BOUNDRY NAILING. BLOCKING ONLY v -- ;; ___ :; califomia istared atifi engn 704.2.3 Fra-r he protection of tru when naquir by Tobta 8-A t REQUIRED WHEN CALLED FOR ON PLANS - EDGE PROVIDE 2x FULL DEPTH fil NAILING {£N} C` SLOCK'G 0 8'-0" O.C. MAX. 2x4 FLAT BLOCK'G AT OTHER EDGES IF 1704 Ron.. an of prefabricated on et ation Inc g required ispe tions and NOTES: 1.MIN. PLYWOOD SHEET IS T X 4' CALLED FOR ON 1 c coUans. 2. USE BOUNDRY NAILING AT ALL RIDGES PERIMETER OR B D G PANS {BLocKED) I " , 1 ...._. _It_ .__ _.'. 3211.E ectors shotl srompiy with E78C apter VALLEYS, AND OPENINGS, Divlelon ill, and providing LOCATIONPLYWOOD BOUNDRY NAILING EDGE NAILING, FIELD NAiUNG P`N' cttans by approved agency. * CC 2343 qht metal plats connected Waal by 8 ROOF 1/2' THICK UNBLOCKED CD-X (P,1.23/0) 8d AT 6" O.C. 8d AT 6' O.C. Bd AT It D.C, PLUG'D 19n' �� g mquired by FLOOR 5/8' OR 3/4° * THICK PLY. T&cG COX (P.1.32/16 10d AT 6" O.C. 10d AT 6" D.0 10d AT 10" 0, 2328.11.2 Trusses spaced at intervals more than 1 U UN PLYWt� D F D M shalt bear within 5` of the elide lleF or a third top pieta ehali be instdtad. --�`---- i - i HANDRAIL 1-1/2• - 2"MAX, 1 l/2" HAND RAC. € 1 STAIR Ik RAC The ICBO approved anew number must noted on shop �1✓-� 10-1 Y 2 5/8• TYPE 'x` DRYWALL, ) 3 2 LY _ 2x �.OGONG REQ'D # 3 4 - - 2 - - _ - - i.iRti�a.. I l Ftt)OR T ('; '}SiRINtR �C N 1 1 1 R ti 1 i I 2° STUD WALL AS 6 3. 2X LEDGER 1" - C OUS HEADER. ad 2 6 FRAMING PLAN Et7R S12E (2 } ae ( '� 1 { (3) 16d 1/5 STUD .� .+ 2, h 1 r �� 2, - SIMP, ST 623E E S - � ( 5 4, SIMP NG'R'5 r/ OF E/POST (4 TOTAL) 3 I 5 y% 4 2x �,Gta O/C f FIN. FLOOR. ELEV. _ 3. - 4X POSTS WD Bit OR 6 I 3 2 . urs 0 is- O/c SEE FRAMING PLAN FOR Si2f c{NCR�Tk'SL9. rY EAR PANEL X 1 PLYWOOD 5UBTOOR I 1 4X4 POST BOTTOM & TOP OF RAIL AMING PLAN FOR TYPE a 2 3/4 PLYWOOD TREADS & RI 2 HANDRAIL 1-1/2' - 2` MAX; 7 E 1 k 1 2X14 STRINGERS (MN.3) � 3 DOUBLE JOiST OR HEADER OR BM- EDGE N G. 1 2x2 ITERMED. RAILS { < 4"BL" (WETSL} 2 PLYWOOD TREADS & RISER 3/4")F1 SEE PLAN OR TOP OF STUD WALL 6. - CONTINUOUS PLATE. 3 2X4 P.T. PLATE ANC C 4 APPROVED METAL HANGERS I4 2 SCREWS 5 LONG 5s J Wt/ SHOT R 1s' O.C. 5 W4 STRINGERS (MiN.3) t t tf 7. -ANCHOR BOLT. OR 5/8'. CHOR BOLT O 16 D.C. ��,J I a 5/9` TYPE 'x' DRYWALL SEE PLAN . FRS Cr SUMAM �€ MML AT Fr. M UNMG A�vn FV/{PLF) EXTERIOR FOUNDATION INTERIOR FOUNDATION UPPER FLOOR SILL Pt ATE NAILING PLYWOOD ROOF SIMP. ST. 2115. 0 PLATE SHEAR PANEL ANCHOR BOLTS ANCHOR BOLTS PLATE NAILING ***A35 SHEATHING @ 32" O.0 N/A N/A N/A NIA 2x ROOF RAFTER POST,.EN I I SEE PLAN , / ! d 1 PANEL MARK SHEAR PANEL DESCRIPTION See notes #5 Below 7/8" Strcco / Lath 16 a staples ISO 5/8 @ 40 o/c NIA 16d @ 8 o/c 1 * 3/8" Struct Ply 8d @ 6" otc - i side 260 5/a" @ 28" o/c 5/8' @ 28" o/c 16d @ 6" o/c @ 16"o/c * 3/8" Struct Ply8d @ 6'" o/c - 2 side 520 5/&' @ 14" o/c 5/&' @ 14" o/c 16d @ 3" o/c @ 8" a/c 1 * 3/8" Struct Ply sal @ 4" o/c - 1 side # 380 5/8" @ 18" o/c 5/9' @ 18" o/c 1 /2" Dia. X 5" LAG SCREWS @ 27" o/c @ 16" o/ * 3/8" Struct Pt 8d @ 4" o/c - 2 side 760 5/&' @ 9" o/c 5/8" @ 9" o/c 1 /2" Dia. X 5" LAG SCREWS @ 13" o/c @ W' afc * 3/8" Struct Ply 8d @ 3" o/c - i side ## 490 5/K @ 15" o/c 5/8" @ 15" o/c 1 /2" Dia. X 5" LAG SCREWS @ 20" o/c @ 16" a/ * 3/8 Struct Ply a"d C@ 3" o/c • 2 sick 98U 5/8" s 7 1 /2" a1c 5/8" @ 7 1 /2" o/c 1 /2" Dia. X 5" LAG SCREWS @ 10" o/c @ W o/c 1 * 3/8" Struct Ply 8d @ 2" o/c - 1 side **640 5/8" @ 12" o/c 518" @ 12" o/c 1 /2" Dia. X 5" LAG SCREWS @ 16" o/c @ 16" o/ * 3/8" Struct Ply 8d @ 2" o/c - 2 side *# 1280 5/8" @ 6" o/c 5/8" @ 6" o/c 1 /2" Dia. X 5" LAG SCREWS @ 8" o/c @ 8" o/c t 1 /2" Struct Ply 10d @ 2" o/c - 2 side ** 770 5/8" @ 9" o/c 518" @ 9" o/c 1 /2" Dia. X 5" LAG SCREWS @ 8" o/c @ 8" o/c 1 1/2 _ ` Struct Ply 10d @ 2" o/c .1 side ** 870 5/8" @ 8" o/c 5/8" @ 8" o/c 112" Dia. X 5" LAG SCREWS @ 13" o/c @ 8" o/c 1 /2' Struct Ply10d @ 2" o/c - 2 side ** 1740 5/&' @ 4" o/c 5 8" @ 4" o/c 1 /2" Dia. X 5" 1AG SCREWS @ 6" o/c @ W o/c 1. A35 1. CN denotes cooler nails. 2 F3 5 2. ' denotes that shear blocking is required to obtain specified values. 3, TOP PLS 3. AU ply sheathing to be fieldnaLLed @ 12" o/c with nail size specified. 4. SOLE PLATS 2 1 4. Standard Grade ply may be substituted for Struct Ply where specified. 5. SOL. BLK. 5. Schedule 1 indicates masonry or pipe column SIMPSON Strongwatt struct etc. See plan 6, Stucco Lath, specified above, to be expanded metal or woven wire. 3 Staple Leg to be 7/8" long. Staple spacing applies to all stud, plates, and blocking. #* 7. Panel Mark 11 thtu 18 shall be provide with 3 x 4 end studs and sitt plates min, A�_t 8. Provide 2 layers of grade paper (felt) over plywood shear waits. %F.d" R WALL SIBgXXE j-+ -61 2 X P T $ILL W1 CIWI 3 1 /2" CONC. SLAB * * X10" A307 A.B. AT 8 {u. n. i 1. - PT 2 X PL u.o.a see pt VV / b X 6 10.10 WWM PLAN 72" SHOWN: 8 g 2- - (2 X 4 Pr. u.a.c, see plan IF SHOWN ON PLO.ATE PLATE WASHERS AS E 3. - SOL 8LKG. 4. - A35 0 16' D. ORANGE COUNTY 2" SQ. X 3/16" THK. 2 4 5. - # 4 REBAR . r1r B(UON) airrertrufi'iileelalnlw 5. - 2 x FJ U.C. ------------ 7. - 5/8' O' A8307 . 3 18 T O 72` D.C. * . FIN. GRADE 12' FROM CORNERS NAT. GRADE 8. - 13 WALL INSUL R - 19 F'LR. INSUL BLOCKING- (2) NO. 4 BAR TOP a BOT. u.o.n. 2' SO X 3/16` THICK - PLATE WASHERS * PLATE WASHERS 7 6 4. 2° SQ, X 3/16' THK. ' 2" SQ. X 3/16" THK. - e Flow PSI. CONC, 5 PC M 1 STORY 12° TYPE "V" CEMENT (u.o.n.) * LA, 7Y, - 2 1 /2" z 15" 2 1!2 Q X 1 t4" THK.STORY N W/ #3 BARS E.W. @ 18" O/C 10MIL BARR 0/ 4" SANG 1 STORY 12° 2500 PSI. CONC. (TYP) 2 15' TYPE "V" CEMENT u.o.n. T iAic-A �"� '� CO �i• M.RASM s 01 J'r /-USE SIMPSON MST---- SIMP, MST60 MIN. SHE a WALL MATER WHERE OCCURS S P A B.N. x BLK'G" HDR, WHERE OCCURS 2x STUDS-- @ 16" O.C. 6 STL. STRAP U.N.O. PLYWOOD SEE PLAN FLOOR SHT'G. SIMP "A35" DOUBLE STUDS Q 16' O.C. EQ. 1 STUDS OR SEE NOTES FILL ALL HOU 16" NAiLS TO (TYP. TOP & B, 2x JOIST SEE PLAN SHEAR WALL MATERIAL SEE PLAN HD 1�1 2 RiDGE BD. EHBED j DUST CONC. W VAULTED SAME TENSION LOADS FOR THREADED ROD ANCHORS OF R BO SIMP. U HANGERS BM IN PLACE IN CONCRETE FOIJNDA71ON SlEMWJALL INSTALLATION OF W/ U/ "HANGERS D t1RtLL MN. MIN. MN. YG ALL DIA BIT MIN WALL EDGE END LTtm r�r CIA EMBED DIST DIST NESSOAS 50 ADD PLAIE2X 1;&tt TUDS A35 EA ENO t2 6 t 3 4 5 16160 404 NEW SHEAR PANEL AT (E) WALL/FFG 7/8 1 15 1 2 $ 1 3/4 5 23340 583 SIMP, WA ADHESIVE ANCHOR SYSTEM IC80 REPORT N2 494S - ET EPDX'G crop COWIN, FTG PT SOLE PL arq 2540 PSI CONC U.II,N. THICKEN TO DOWELS � F, + A `rRtti{16! t�Eilli���� ��tl�i, 2X STUDS PLYWOOD SHEAR 0 16" O.C. NEL SEE PLAN SEE SCHED, COD, P.N. FLOOR SHT'G. 4X, 6X P.N. POST 2X 8L HD n 2X F. JOIST SEE PLAN 4, 6XFJ NCR. WH ��. SIMP. A35 (1 �l OCCURE SEE SCHED. /a" THK ° 2X STUDS ASHER TYP. @ 16" O.C. I 4X, 6X POST AT WALL _ OR k I�F- u A`Lt .. F.dt ' ._ OFFSU SMAR WALLS WOOD BEAM WOOD BEAM "- SPLICE SEE WHERE 5EE PLAN - OCCURS 2x STUDS SEE ARCH. owes. T R 16' Q.C. 1 • j}3 NOSING -- - SEE S ED. BAR TYP. SIMP. "CC" SIMPSON CC COLUMN 2x BLK' AT COL. CAP CAP W M.B. PER MID AN MANUFACTURER'S 17. WOOD POST SPECIFICATIONS SEE POS <TYPCCAL) ' WOOD POST KP. WOOD POST (TYPICA 1 FE.40., WAYS" O.C. x-x SEE PLAN 1/2' SIMP. 'CC' L 2-'4 G x, 2x JOIST SEE PLAN #4 DWLS. " HGLT IMPSQN 'A35 IV V_e SCHED. NOTES: 6 3/4 1. DAP iN POST STRAPS t I WHEN IS T BEAM WIDTH LWOOD BM. � 2. EASE BEAM CORNERS TO SEE PLAN FIT RADIUS OR U R. 3/16" 5" 1." RJR OR TRU55 PER PLAN 3 2 6 2. ROOF 5HEATHIN6 ° 0 5. MIN. IX GONT. BOARD W f3)i'd`a TO EACH ROOF FRAMING ELEMENT. 4. 2X RJR a GA. FRAMING. 4 USE 2X4 a 24' O.G. FOR MAX. SPAN OF 6'-0" 4 2X6 0 24" D.G. FOR MAX. SPAN OF 10'-0'. 5 4 TOE NAiL W (5) DcVs.- I S. 2X6 PURLiN 4 2X4 KICKER �fAN�NECTION DETAIL GALiF FRAM'fa. O RiDcSE l-_- (�g�-.� `�0 6'-O" O.C. MAX. TO LIMIT RJR SPAN 0 CALIF. FRAMING 6. (1) SAY WIDTH X 50' ACCE ���tl 3 S .y 4 W r- �fF4.% T12r UARD RAiL. H = 20 X 4 = 80 /F h * A- STUD ALL PER M = 80 X 3.5 = 2 1/111 280 x1 68 20,000 SQ B- 3/8" THK. S TEMPD 3 SET IN 3/8" DADO S = = 0.167 4 SIDES 6 0 4 X 4 POST 280 X 12 CONK _ 560 & 2X HANDRAIL 2X BALLASTER * VERTICAL 2X2" SPACED 4X4 POST C IR MAX. e O.C. O 4'-" O.0 MAX. 40 POST C 4W O.C. (2) 5/a BOLTS N, 1HRU MST (JST MAY RUN OPP DiRECT10N) �g I. ' fV%T1 !"sTTAVT% 1 ATT 1%Td"_ Q WE CALIF. FRM6 (PLAN V154) \ 1 `"w.,.� CALIF. IMI�M BHEAR TAIL v✓� PLATFORM FRAMED SHEAR WALL W1 ATnC RAKE � OF ' SHT I EXCERPTS FROM CHAPTER 23 GENERAL NOTES 3. All Structural Steel shall be fabricated in shop of a 31. Doubletop plot" with min.. 41r top Splices to be I licensed fabricator and shop drawings sholl be subinitted provided with min.($) 16d's per plate optics. TABLE 2341-0-1-MAtUNG SCHEDULE' I The aneral oon-Act- wd &^^h -w-4,ractor athall oki-1, natat .4o *%,. h 0- __kl*A�_+ i, � V-110,11 V -V rr verify ell dimensions and site conditions before starting to fabrication. Steel fabricator shall submit shop S2. Top plate brooks ona shall occur over a stud or post pri rk low work. The architect or *Mo Designs* shall be notified of drawings to general contractor and owner for revs any. discroponcy. prior to fabrication. Any proposed deviation. addition or 3:5. Solid blocking between perpendicular joist at bearing and questions shall be noted conspicuously and elpod at Shoor wallat. . y on 2. Dimensioning shall take precedence over scales shown on shop drawings. Steel fabricator shall field ohook,dil drIdwinglej typical details and general notes are minimum dii"entions prior to orection to provide for p�olpiir filt. 34. Al exposed boomai and he" timber recommended to be used when conditions are not shown free of hOrt center. otherwise. 4. Use 4" round machine betts.. 11,Wround holos,'for oil connections, unto," othorwiso 'shown. Al bolts,shall 35. All isolated posts and, boom* to have !Simpson: PWs 3t N6143. and details on elolltwings sholl,toks precedence conform to A-307 far -unfinished bolts. except whom /or, eVe min.. u.an. over Gonorof Notes orld, typical cletaft where no details are noted as high strength balts wh14W+"I A-4100. Hl Shown conilt c 2=100 �AtN A-32S or AV qh toppile 46. All "Simpson" HOPA and; CS hoklow . ruptlon sholl conform to espollor woW on no to be fastened to "Ject. bolts sholl " friction t sholl a no point, 4x4 post' mitt. u.00. pr* ype and norii all. or golv4driiiing betwitim the contatt surface. 4* 37.,AII q *-dor walls are ocomd...with, %V0.00" . chw '(ilis' 1,27 bell, '*Oosod t 66ft of inalilm At its4l 4 -i4ti%or AWI 69 not�-ailpfld­ h goloortll6d 4ft* fabAbotl6n. used in lieu -of anchor iialts). be C "at �ril* n -a ASM A-t-53­8, with shot pins per dards columns shall conform t 38.; All Intodor wollai to be ssoblAid (7�0* E or S) Monvifac . untr*s- u.on. calculations govtem in A0 I by'.the: 'r do" all 0001". ROCOMOWW" ftin"t/ edhoad M16d at W moom approval A-�= + Uwoicper "0 report No 1 47. 16,10- IS � 40-d' S' i W-1044tidift 7. Tube col: conform to ASTM -5,011 or Grade 8i 44 4*0movout Must I* di to, ailt .1, . ­­ . 39;� P41 -conventional frOme i 0 , ''of 4ft-006 die'td bil, Iht* M - or S. Where fWah is attached to strtidurol, st I - p y V.D.U. U-0-n. Walt holes, A. 400.4. !or aitichrilird'if nallem. Sim oanstfuebed per S60W, 44001138 Aructural d".1hgo far finlathell"(01, N#lson S.tudJ�"k3o CPL)� 40.�All shop drawings ore to be r*Wew*d by contractor and 'a 01;%1_*Wr*i 101octrical oo#,�oi, honical drawings. for prior to s4timlittat. for ongineer,r"taw. 0%. IMIAM".! Irba, 40"1000, not shown on+ 41'L Truss: monufdoturtr 'to 011oiiidia oAuldboft. Shop drowings, details truss hanig6lej bridging.and *radio" 7. VibrWem eff*da- Iof m6thdAit0f equi have not been AD strue lumi bpr *hall be 00.in ocap once breatrij. *0 the 0 Glum Rul� A_116AS for !t*[M1D'-N6;_2S ­1" . , . . i 42. Pro�ildo double 2* sale 0 'Ufrotbor and' �Iqt" with $we plate. nofts speaffied on the plans at both pk weight 'floor *stofl�, *d* "aw 0. 4 "soft of a of", tu where *'.I1W'wsIght 2. All wood ring, on vorwete'vi, mosicary aboll-Ve, dancro" is Used at supoorti oto - 13, sok naspo, bill -:af the prissuro t �ftu Fir or gligs, redwo" 0Q.; h4s ruk �9`� The 43... Whore both top piotes- are broken, strop with ST =he'� stdbllWy� of the iii i .'to+ 0',"0 _71iatt�� f and" 3. �HOI" Vhell� be -bored 0-blt.,&* to V-11arger u^n. "tho Ww of'off shillir*wam. rook - floor than 'the I halt diameter. 4C CoMmon, nails johdil be used fvr all pty shoothi t ContridOr"thdil WOWde op Iting. Ali haimmiare be plote'splices amid so -to P-146 no 4 All: bo%j -0f, pAor to f�i,be na-tig llp.� Opp l6swiled- wAh nalls poe fflantiliffti4ift 0.1dif ts. Aa, -ilis 41to by a ­6 S galso- v p �_ih" in$ �17 *a of p 5'. bole shatt nat.;b&,M:`%r: 'to. Cuams/um. WM. I mbum, invemi aft during *10*4 am U"I P". n4ed or detcgled�, 1. All glued laminated members iWI -to. rkade of I)r Douglas Inations, combination 24-# por AITC. 6. 2x solid 611i0ding shall, be placed between )olitjs or Fir I*W found,, r4fters -at. a0­;**p6rts, except �whon� laidpwod. 2. Ind app. grade: Fb-24WOSI; �Y-1$6 PSI. E-1.8x106 PS mf ruadj�� V -&-ft " _.AA_1A 3. ind-fAill a-rance, ariade Ahd4­be,-s­d- with n"W"ssturfli 1997 UNIFORM BUILDING CODE r- co"NEC'nom $4,41UP101 I . Joist to sill or girder, toottait 3-8d 2. Bridging to joist, menaill each end 2-8d 1 1 1 x 6' (.)5 mm x 152 mm) subficior or loss to each joist, face nail 2-8d 4. Wider than I ' X 6' (25 mm X 152 in in) subfloor to each joist, face nail 3-Sd 5. 2" (3 1. mm) subliloor to joist.orgirder, blind and face nail 2-16d 6. Sole plate to joist or blocking, typical face nail 16d at t6' (406 mm) o.c. Solo plate tojolst or blocking, at braced wall panels 3-16d per 16" (400 mm) 7� Top plate to slud� end nail 2,16d 3, Stud to sole, plate 4-8d, toenail or 2-16d, and nail 9. Double studs, face nail 16d at-24' (610 mm) o.o. M Doubled top plates, typical face nail 16d at 161 �(406 mlolo. Double top plates, lap splice 16d 11. Blocking between joists or rafters, to top plate, toenail 12, Rim'jbist to top plate, toenail 8d at 6" (152 mm) o.c., 13. Up plates, lips and intersections, face nail 2-16d Continuous header, two pieces 16d it 16' (406 mm) oc. along each edge -14. is, Collins joitts to phirakI to;znail 3-8d 16. Cont�ouoas header to stud, itiesidij 4-Sd _TT Cc* , lift joists, lips over parotions, face nail 3.16d 11 ceilif*joisjs to parallel rafters, face nail 3-16d 19. Rifterto plate, tatntail '20. 1- (Z ntm) bfate�weaich Stud and plate, fact usil 2-8d x,r(25mm X 2-8d 22, Wideir than I" X 9' (25 turn X 203 mm) Sheathing to each beatinp, face nail 3-8d 23. Built-4p comisrstuds 16d at 24" (610 nun) oc. 24, Built -lip jitiler and beams 20d at 321 (813 rmn5 oc. at top and bottom and staggered 2-20d at ends and at each splice 15� Z' (St mm) planks, 2-16d at each bearing 2& Wood structural panels and particleboard'-: Suhftor and wall sheathing,(to framin& J/,2` (111 mm),aAd less. 6d3 19/3o,_'34" (15 mm-19 mm) SO or US 7/8 ".1 , (22 Mm-25 ramr) 8d3 I lle-I 1/4" (29 mm-32mm) lod4 of 8d$ Combination subiloor-underlayment (to frambi& 3/4" (19 mm) and It-% 6d5 (22 mm-25 mm) Sds 1118'-1114' (29 mmw32mm) lod4 or 8415 '27. Panelsiding (to framing):4 (12.7 mm) or less 6d6 (1,6 mm) .28. File" sheathing., l7a"(117 nun) No. 11 ga.8 6d4 No. 16 ga.9 25,32, (20 mm) No. 11 gO 8d4 No. 16 ga.9 2% Interior paneling 1/4" (6.4 mm) 4dio (9 � le .5 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT."ME. - ---------- 6Afll SYSTEM NAME Addition _.!!�u%PUXP!LsY3t0us Total Room Loads in Vented Lighting Return Air Ducts Ratum Fan Ventilation Suppty Fan SupplyAluDucts TOTAL SYSTEM 1.0" ­TotAI!?Urt1put (stut).- - - .. ­­­ __ Output istuniscIft) , `­ 2(4�3 cooling-lIlystem 'am output Por system 57.000 TOW Output (Stuh) 67,00,0 ._1?!!IOUW(T-$) 4.8 170.4 Total Ouw 70A CF1A por Systom Akftw (rft) A"aW (dinlron) 40 I Total AqJustod System Output Outstille Air (%) I Outside Atr (drWitelit) TiM OF sysT-Em PEAK NoW values *a" given at Aftleoridglons 33,0 *F 69.8 OF 69,8:aF 104,3 0 OutWeAir Odin? Supply Fan Heating coil 1905 elm 694 of h Return Air Ducts 14 33Q," 0 0 0 2616 h Sgpply.Air Ducts'j 1041oF RO-0-M.S. 70.0*F 'Commonor box nails in be used except where otherwise stated. . �Pf 00,14rit 7-149", ito^ jr 00% Oor 10 in depth and, �all_raof -Joist over 1W Nails spaced at 6 inches7152 mm) on center at edges, 12 inches (305 min) at intermediate supports except 6 inches 152 mm) at all Supports what, sparts are 48 inchiss,(1219 mm) or more. For;nailing of7wood structural panel and particleboard dialibragms, and shear walls, rogrtti Sections 2315.3.3 and 2315�4. Nails 1 "fabric b 8&3166.70F SON b"Ift d At 4. 78.1162.7 OF live rt� :; I for wall ilicalbing may be corn ri, box or caging. 78.1162YOF 55.8164,60F 0. Alt struottirel plywood *hall -be StMeWrOl$ 'or-,J0-D: grade shall be "Common. !'Deformed shank, ,R 9 Or a' 9W,0"l r b inC� am m Outside Air conforming to the requirements ofSeo, i 3 with ox 0��_Jlue -Unless now atherwisa'an'd *o6farm,*to Im 6 *rd t r *,od w nclic4tln C siding or casing naih, ton 2304. 0 clim Lom �,'Fasteners spaced 3 inches (76 min) on center at exterior edges and 64oches (152 mm) on center at intermediate Sit it. Supply Fan Coolhig Coll uW 11 6 nails with 7/16-imit-diameLer (I I mm) head and 111/2 �ZoihAhSO, $hall: be *%derANW, OY re�pwre": 0W.- =21. rd it I a W motion, 00CUM -inch (38 mm) length for 1/24nch K.7 mm) sheathing Ind I 3/4-inch (44 min I:, May 0.6 3 Fly- en 1905 ann 5 014od kwAinoted members. Shall be o6canpaoial-d. b a it it on 0 ec on 2101�3, '"Jio_�Ihe_pl' Lprior-Act! a S i a c h )I g* to, f -inch (38,mm) length A. 4 iiti -r,i r, f rch (12.7 mar),sheadringand I 11Z r sooiction., C; nic, 'i 11 `-c 97 i Thh�. re"". Stomp O.F.P�A. or A.PA I bear experis v cog /j(_!� h and I 4k twoArle an wood- 4ii 0 IOLA thot, 18"Op"Onc, S., Of 'th, 4. 40 11!! 9. Alf'b6ft 44h ipei J& dS4 It in jbll� 11 --)1- 78.11621 OF 000A ' "As 00 j, i ce - 104.3 'i "h and tftts. A o0rtffltd­W of iftsPeWon ifidit be 'i, th I cl ,he' it re. i .g ree o ap. n"00' on not, unless otherwise marked]. Casing or finish nails Or, n a M. ay. I- _b offthiatt uridit� H drfd niA unless not"'6*40-w 508-ru)", 9 .is in for -.rr. isti'm 'a no j 1`5 inch., (I runt) 2 in s 'to 'Sh an pti I to at m� d, 61. c a sippoils. t. Ao tfie Building tlepartm A., I aced (610 i chal (30 -WI. 2 inches (305 mm) at intermediatestipports. po a. in. a 'i nor on jxm, IS J So a e a, or r c to." t ran, I 14m ws, -�uls "'.ce ocho, Y., o* 10. All moW- anchorej fast*",re shall 6. !he fabricator shall submit oomplat off) Sho ot to Ishp ng in drqwi,, to wo mWit 'be oMar wpy be from t*VWN Building D"artmont and k 664iji opproVol prilor.to -Iti 9,by ES-1/7UL P.Pt, qp0r*ved, in we u-1A 11. All. structural lumber,,sholl �be­-Rouqla*,&-Lorth, -19X. �e 011* 6*4 4%,04 f&* oiftft'd to wiiii-A (i ilswo .1aw. t." . 0. OtherViso. wing -- -applied �_0*3,61 _,9lNMISS_u t 7. All glued laminated boom# will have 0 .00dard comber far oommortiol). 2x44 studs (4p.to 10) ..... `Stud Gradso or better. twd on a rodus-1600 u.*.n. MANDATORY MEASVRES CHECKLIST: RESIDENTIAL (Page I of L) MF-IR MANDATgRY MEASURES CHECKLIST: RESIDENTIAL (Patte 2 of2) MF-IR 1 , & 1%,sse Pion& or,*. intended solely- for the use �of the 2x� Studs (tivor 10') "Constmetion, - grade" & Pomiltax� PSC 2.OE by truss joist Mdcafts.t, W NERt i9Z Owner f6r, cdh$trtioftn� and-. are. 4�preisly� not Intended for 21x. plate$ *Standard. grade or bW*e ftob�900 PSI, tv-290 PSI, E-2;0 Note. Lowrist residential buildings subject to the Standards must ocintain'these measures regardless ofthe compliance approach used. Note. Lowrise residential buildingstiub0c1to the standards must contain these tifthe comptiance approach tmd. 2,X Items marked Withan asttrisk(*) nay besupersedled by,mortstTingentcomplian,:omquiramntsiistedon dipcoytmeateol, Items Triarked with an asterisk (*)k my be superseded by more stringent listed on ihe certificate of Asse. in mork*t!R9,- 6-ftnor",. atlons*,aha other details on 6 studs N0.2 N' 0-betairing Writ Compliance. When this checklist is incorporated into the permit doctiments, the features noted $hall be Compliance. When this checklist is incoypocitod Into the permit diocumentsthis fesus 9. Wavidet multiple 2x4 squash btocks.Iu let NA,.2 considered by all parties as Fes noted 34!1 be *prulidpred by all parties as fly a -rA,0, -t4tion'06d m*yVary 100* fr4M ab0i to top pidt" 0. IsVil. minimum component perfornmee specifications for the mandatory measures whether they are she" elsewhere in the doinimmis minimum component peribrMancts specifications for the mandatory mess "s are on 06S.On 'a ures whether they no shown elsewhere: in the documents m he Fkuo .., I I . I . 1, % I or oii this ehoddigt daly. a or on this checklist only, 'WING I.11A, NER, 2C NAM ANO M 11 ?,h It. vM -4-par, NO 1. ada requver*111 to tie. per. th c4oll histmotions. Check or-ilatifial applicable box" when completed -or enter N/A iflot applicable., Instructions: Check or initial applicable boxes When Completed or, chief NIA if not applicable. 0, on gr -00 -and sr�allior WVPURC '13 a. IN fravido double TV a or doubiv TJ,,s, MOO when, 16d soilli -77W'7, -and iaigir Nd.1 Uds stru,4 rat itoin 'i by p*, nallin' is, loss than Vaei at sh*66,".: -abovoi A flw� ex Nor. Ine . or. to tt ot Mad Muldli '11000""C' of timber No. I �1 4*1111 W. joi ",for drilling 1:5. iln,tho,�.,awmtw ­thdrorl, nkin4_and deaki o0m* dox 0"Umb. Tu affict bW,*"n ,and StlRiaturA,3lq$,S W"a Ao bWSht9. and st= suI661*4or intinded,, use 41 A-4; on ation, a Et sing 4 01: #2',, Fliliiia I 1",- 1`510 PSI '20 and 'd 44for, Al tim",J)A A �t 6D slpq; ","14drolit, fidW­­ FO-1,1401-i3io 21"Ibir 6116weiblii vall I�Wnq volue is 1,W ftP for continuciat Fbiai"160-10.0 PSI - JX` 'i va oo P: 0 oil 9 P4, 104 4"d-A ox", 000."_.,�Owk �*rp. t !a under im 4., Separate -pe*.Ots shall -be -tobtainald-kfolk-all, folvewand w0si W 1b `ft: AdIL-.6, 1X14 M FS- j�.% V 0 i*M*6: "I -on 2 or Oquirod. tw� 08 Flilaa� 1, 49 kl kis 4 A# 10 tllI.. I ft Provid 0 po".xpanialve.fill !as rvqwrod! to 1w*1 -pod. .4)(12F 2i 11' water wift'i'drain-oloW.f. m Wklidq otbirr'd Aw 'y to shall dron bulldlagI -from � i 'of *uNdIng-tol-stf FS I _A, �,o 300or Z! 4MAi., in 0.14 _J toot 2 Vy,::2"_ i1004vor' Is.910010 04.1 7 �11** be no Oti'llty: trench nilor'04 buildirt than, . fti'eo thw, WO, 010 40" --roln I -W"`)Wl016ifId'- dft "Or 45 f M 6ow- bo"" otittsidi '00mor any a0tillio. Mffl AWarl , _C� fp Wt 23�4)"01. sat IZ All Railing -to be,-WjAabI#,#­A �Vf� the-lat t­.­ on At "is W '�'tW dld�' �'-, fir Ail 1949 .6 400 Oak Pn '9"jsk� *6 iso -by. soll re," 4101W floor and r4iif shopt "I be lald. 11,011C and - !*down baft, as over, mp owl - 00#� gr4b . f Ow --a 4 u 0­0 IfO 04 6 -0aa i4bar in 4 --at 4 above *W floor by SUCA66 A W Jodifto, 0 cof*wl,� he. jfo4p lon-0 W� 'retor'lla, g,c, i"'i-olis 06ber 46-tivo -so C v A -the J10W mi* M611C -jort, '0 N. reo *be 4 - and as��nt colitaretf,($-, - I Q__",ay;,pa49 S6*1 pl� v,W kow" Jor,.�_ _'mo Lo -plqr o ;W-40. *_00wits, *dNobw -,13.,--for -post 1ension. skilib, rsfsr�'A* appiroyod, is: pmpar Err de '*06d 1 0 . oi !�!r "A'S.,150kia asts �ond:tblu,­ 040d, -0y �a - dI 14'. ium''."allao relploftle."16"t and,po "ImMent -C 10: Vie. 00. It m . _1VS-*__ 'd 4V liks''t 'a !a - 0*4iasift Installation Procedures Mimi residential roofi; provide some 13w of attic or airspace that elm 000 accommodate an effective radiant barrier system. in new residential construction, it is fairly easy to install a radiant b�wier sy e 14 Knm 10-9, #A �u ilic unur-i-swe of ine recr qeCK. R0.0i'DECKINO tsupp iy Air uucts.3 -I, I I Location 2 may offer advantages to the builder during construction of a new house. Before the 56,9154.5 OF roof sheathing is applied, the radiant barrier is draped over the rafters or 424114 R.N. [ trusses in a way that allows the product to droop 1- 1 /2 to 3 inches between 78.0 62.6 0 F each -rafter. To.obuin the best performance with radiant barriers installed in Locations I through 4, radiant barrier material should also be installed over the gable ends. For attics that we open to the space over garages or carports, the radiant barrier should extend eight feet or more into the garage or carport to achieve the same effect as installing a radiant barrier on the gable ends. It is not necessary to cover the gable ends with Location 5. DISCHME RLMN Radiant barriers that are reflective on one or both sides may be used with Noll" Must be shoum A on the title ibest of am plan any of these locations. However, if the radiant barrier is reflective on only 1. In the case of'saj'argemy, Wit of Work Phone or NO" Phone #_ one side, the reflective side must face toward the main attic space for Locafi6ns I and S. Since a surface fning downwards is less like:ly to have 2. Sedintatt imm &-"a disturbed by construction shad be retained on site using stfUdural C01113nots to this mandmilto dust settle on it, it is also recommended that the reflective side face wdent praajcsbla� 3. stockpiles of still man be limporty contalnedto minim1w sedmenit trainsport1ionn-the I site In aftets. drainage downwards toward the main attic space for Locations 2,3, and 4. facilities or adjoeentprolliortlesvis ruriall, i4hicie tooking, orwind. 4. Appropriate BMP's ftr owstructiorKelated metarlials, wastes, spills Shall be Implemented to minimize transport Since proper attic venting is important to obtain the best performance, of ihe DESCRIPTION DESIGNtR ENFORCEMENT SL�acq Conditioning, water Heatingand Plumbing �ystem Measurau (continued) I �A(rrin Qum and Fans 1. Alliluen 601,603.604,404 Standard 6-3; duom irtiulated to.a ounimuss installed level oflit-4.2 or enclosed endrely in conditioned vact. Openings "I be sacto"th inude. uipa� scrawl saitiruI of other dw-110we J System that MOM 1110APPricable mcpslrem�ntsof()L 141, UL 19 tA. or UL 1911a. Itimailcortapiliusod to $121 oPeturip grater than 114 inchI the sad either mesh or tvc "I be used. theiroothponentsslu'll not be saW with clads back rubberadhetwo duct tapes unlesa, such tape is used in combinationwith Mastic and drawUltitis. 2, ExhatustIlm systems have back draft or automatic dampem 3. Gravity, ventilating systems serving con4ijitnto spcp haye either automatic __MO-n-ally Operated 4ar"oem §114: Pool and Spa Hearing Systems and E4Ujpanmt. 1, System ht electric t4el$umOit hiethitt and no pilot light 2. system h� installed .4he a. At team 36" orpipe between fifter and heater for future solar heating, b- COWr for outdo" P001407 QUtdOW 3pa$, 1, Pool.systom has -directional inlets and a f�.elisiao pumptimas-itch. 11$: Ots ritedconitallifinam, pool heaters. 4pa haters orimuschold cooking appliances havonit cominuousivburringoilot light, (Exceotiwri with 0j at < ISO Btwbr) �l 50(k�i.t 1,umintrims for general )!$bring in kitchens shall have jump$ with an efficacy qr4o junscrWwAu I lighting in kitchaus- 'this lighting W general $hall becontrolled by a switch onO o"Ifid J!M!Eju!�� kitchen. 150)1tit�oms with *-sbower or badutuli-triiii have elthevot te"t 6int lumhosltc� with Ismits willf Zvi oroneofaitaficantitygitiothh; Mut�e_mnt allowail in W0f42.:4u4 r*et*d,:tllimt (littaras ate IC (jrksulation cover) ocatovoil. 10.01M.or-r- 011001300--y '" IV radusid. biurier, some modificauon in the atuc, vents may oc required to 5. Rurjoffftm equipmentand vehide Washing $hall be contained at construction sim unto" treated to in&= achieve expected performance. Where no ridge or gable vents exist, it is or remove sediment and otherPollutants. * I recommended that Otte or the other be installed. Always check existing a. All opeetruoSon coniftecox and sobconliador personnel are to ba made swam or the setpukad best management Mellon and good housekeeping measures for the project Site and any asso"ed corlstruC11011 st"11110 areas. ridge vent systems to ensure that roofing paper is not blocking the vent 7. At the and of each day of construction activity all constrX114n debris and WASIA Millaiddis $hall be colleded opening, and check the soffit vents to ensure that they have not been 9M properly disposoct in trash or rooycie t9ne. covered with insulation. Construction sites sW be maintained Inauch a condition that an anticipated slarn does not CWY WS009 Or pollutants off ft site. Discharges ofmatedol other than stormwater only when necessary for performance and a Be especially meful-with-eleetrical wiring, particularly around Complixiort ofoonstructlon peacdoeo, and whorio their do not* cause or Contrillbute to a V104311M -of any water quality junction boxes and old Wiring. Never staple through, neat, or over Standard; cause or threaten b cause pollution, contamination, or nuisance. or contain a hazardous substafte, in Paft 117 30Z electrical wiring. Repair any obvious frayed or defective wiring in a quarft reportable under Federal Regulations 40 CFR and advance of radiant barrier installation. 9, Polirilhat pollutants, lricluill�but am W limited to: solid or liquid dleffsk*1 $P1116, wastes from paints, abons, sootgato, glueo. smes, pesticides, hadiolides, wood proservatim and solvents. saboloo fibers, point ftkw a Work in the attic only,when temperatures are reasonable. or stucoilhogmarills: fuels, 09. lubdosints. and hydraulic. raftlor or battery fluids: fertilizers. vehiclWattulpinwit wash watbir and concrehe wastivallon. coricrow detergent or floal" we" viestes Itom any w4fiblaquIP11181A - Work with a Partner. Not only does it make the job go faster, it also shism dearihig ordnamical do6rasellng and suporthlodrided pohible wator?!ne flushim. means that youll have assistanceshoulif a problem, oQour. Owing oondrudkin� permillee shall dispose of such nutedals In a spooffecl and controlled tomporerY am On If the attic is unfinishekd, watch where you walk. if you St ep, in the -ab physically separated from potential shirnimbir runtiff, with ultimate disposal In amedrance vft klosk wrong place, you could fall through thec.eiling. Step, and stand.only state, and federal requirements. on the attiojoists or trusses or the center of a strong moveable 10. Dowatering otconteminated groundwater, or dischorgingtontarithwed sollis via surface incident Is prohibited. Dowaliving of non-conterninstedl groundwater requires a National Polkitant Discharge FAMIrialloin System Permit thorn working surface. Board * Watch your head.. In most attics, roofing nails penetrate through the drain away inim the face of slopes at theowithsolon of each = =M=dw. = underside of the rOoE A hard hat maybe of some use. ld n 0 da y � 0 sal I a % d I W m o Make sure that the attic space is well ventilated and lighted. 12, The permilloo and contractor "I W rosponolble, and shell take necessary precaution to prevent OWIC #W- om areas whote limpotirided water creates a hazattlots condition. - Do not cover any recessed lights or vents with radiant barrier 13.The ponalfteat and contractor WWI Insped the arcelon om" work and Insture tl�st the wO* Is in $000"11011013 material (attic floor application). Wth the appmed plans. . I I ' 14. The pormillise shall notilly all general contractors. subcortbactors, material suppliers. lessees, and property amterv. that dumpkV of chomicalts; Into, We swin drain system or the, watershed Is prohibited, is. Equiprinant and workers W emergency work shag be made available, at 409 three during the relcY StNawm 1`19006801Y motatfals shaft be available on aft arid aliticilm4kidl at convertlent boatim 00 ladlitate 100KO"OU0000 Of temporary devices when join Is Imminent. 16, A# remonsiple maekin protective devices SW ba, in pit" at " and of each working day when the 5 4)ay Rain PictidbIlity Foracastexceeds,10% 17,. Sediments fyorn areas disturbed by construction shelf be retained On sft using an aflood" of sediment controts to ft MaXimum eatent practicable, and stockpiles of soll shall be-poperly contairsted oroolorivrid -winiihimize sediment transport ftm the site 4o, streets. drainage facillitles of adjacent P(OPWWS via rumalf. vehicle tracking, or wind TO. residues shelf bo;­A�nf^d and retained CERTIFICATE OF COMIPLIANCE FORM(S) on site to minimize transportfrom the, site to S11"lo. oradjobilng property bywind a runoff, Project Name: Aeu ress: Proiect Add M_M*� KS Z01CM.ACTIM1 11MRdOD QUAI Il 1%^&MI 17 FICATE Oam 4 or y ",wom i yw� go FArm latest T SONG"AMOW0 "M tl j columPs rbWK§­, �W­6 0110101 10 1 PIOMt;S '4W 0 J of '80 q mit, sholi-bo *f Sizes sh6vin -am 460 tW r ;0401! �.T U;sr*C.$, ft., post ,�jV hear, 3", �Al Vc m WNW' T -j, ROO' i 41 A 3! is 1_44ight_� u W_­wAh maw-, 0W CF' DF1U,,&T- UQF'lb�T�-TAA q", W �MSIDENTIAL ge of -IR OF COM,PLJ ANCE, RESIDENTIAL (P CF_ I R CERTIFICATE OF COMPL ------- CF 'd' 2* �ID V asim ow &,a I. J10. F & 7 Pf,6j W. R Q -awo' r N it- Date, not Ll E.UALILM I!: ANC _ENT pa, 0 i CF-IR ,-.1- =,w 11=10, *RCR and 0 4 �V "Jill a 'JIVA a l'orrin �# C SYSTEM 'InpVt hydroniCbroombined hydroni, data un4dor Watc, floating Systems, exc d 04 A Plar, Chock i 0�kc F. Docun�" gpt Design l.1,attng Lon Distribution no Prowde, f "in; -1 :. 1, `U, 20M sts 'T6;0101CaI00fc0JnjpIiajjc;eIi the building. features andperfomanceSpecitiostions needed to comply with Z*, ishall be i4ampos 0 3W (V __#0 of Portland Field Check Date rquiprijefur TWO �4, Parts I and 95 of the Calilbmia Code of Regulations, and the-admisistyative tegillations to implement Mi 00" P'Q'rts' Saki 'and 11 Gqm Pl'* Duct or 0" V Minimum Type and Owl Fiat r4o Climate Zone T Heatt?ump'� them, Thiscorti Icate has been signed -by the individuatwith overall desipresponsibility. I�*,t Efficiency Location _0610 - �§ . Me-cilf Agency Use Only ype (f.mAcre, The undersigned A -4 -9;i-spol "I Nping ly, PPOK 4" above. lot :two Thermostat ixoto�) (AFUEoc (doct�, sui�. AN MEL- . ..... a lh� testing atid certifle 'mid fieldr VeriAcation 1yyan,approvtd,HERS rater, Sion approved, equivalent� requires insta r, Wt R, : A W0 bw� recoguize thAt contialialfoe using,duct Sealing and TXVS (Or C*nu= *r.. 00, P I or acke ation.',� a" - =; = 0 ; � .. 0 .. . .... ..... *_!W014-0 ft: " ­, �;- t ­1 FURNACE-, ATTIC "R-2-1 -SETBACK Vertically. ooffn E ipment --------- # - qu . . - Deitneror.0-witer(i Bustinesgand-projessionac 20� Wilton. i "is If .14eat Pump DOculne illation Author Tota I Conditioned Floor-Ama ft, AveM Duct t, Minimum T Efficiency iih 4 , , X"� . I � * " , i per ode) ypkl 42'r,-onditionct, d'' hall . a* " I, - p". 0, �0_9 ao� h it, .9 onditioned Stab F r 7_1L ft, rMostat Configuration Sin ftli .4- C 11 rea Location Duct The hca(pwnp� cyiip� cooling) ISFFM -.A Jill%- v r 14 114.'a 41 iffidit, Min; BUj1.tlin&T)p_e, SJilgl Family rout u Addition 0oic, etc.) Type Name. Name: MARK JOB 4A Project Plan Chec I have reviewed th,: calculatiet" and drawings for the above project and find both to be in compliance with the Energy Efficiency Sjullfa-rdsand Admiristrativo Requirements of the CaliforriaCodoofRtgulauons,ritkf4, Puts I and 6. 1 understand that this review was perforated, as representativAjo ,vlhe enforcement agency, The City of Santa Ana, Wd Cldf4A 90M,&AT116FAL Cirr Ntumbec, 1140-31+09lie mme �� Ito (c V AGSSPLIT- V400 SEER - ATTIC Project permit muntier(s): SETBACK 400­04, as firto ;b to ow a 2.1 21 11*011 .0 d.;-V R- Title/Firm. OWner �Vft to oll��.groo.,-botwo" bok oad heck one w ei Front riontatfia (inputt, --on h. dogrecs from True North and one.) MARKDESIGNS 'Ift, 41; O'll,6i , . " _11­1­­1 ­ I ; I ; * Sh011" un4so , - 1, 3 L " if 900-0, - "If or Adiliess: .0� Nord, io� dick 1- hall W-Ad'i I` bett*M East/ wpstl All Orientations flu . Arlowir r ;iopq 4,9 wo $14111W b A0 bil W"Y 101"U" - W 'T".. 1,44%,90'"o9f., .. 1, � W; LED_D_U_C_T_�,aad--TXVS (or X ures Wwalra form ft Address, ANA 24451- Muela he WOU 11-P be t Sam: __4 % V�`. L , 11 ... ". I Floor t2twitotion T both) " -, wo� _W t ised Now (circle one or Seated Ducts (alivainate z*nes) io vidjo;Ca. 4D� tInstatler testing 2nd ccailication and HERS rater fil old "Orifrostion required) S', #: -no L.Al. 0M -tur T010091W. (949)829- .62 #41SQ0 *1 , , 40 oo' be Mda M�d gilftted ksms-ate, f Wimp, =­ "'y .1 ­ . Required for this 12" (to 4, 't. "", ".ow TXVs or,Commis ion approved equivalene, readay. PSI , 1 ".0 no 4`0wWraing 1 WAI). Orm .00"d -, - C .4tair.. 40*4018 t iolin - of. 2a <1$7,15oriy) 4 = n HERS rtator or 110,4 vfificatio. irod) ja to . Nalv-) 4 tm,; 'Indic .1nin �A 1, 441.1ift W. of MW" i* trow mowo *I I . S.c. 14" 0� 10 1k, 10 W_0 MOK. of 4, of ,g �s",Jlrls 000" Slow, .0011' 11-', 4, �(bq% sides for !te*0*),. OW 2 f M A, sp . W . , , P v It SO 40000a 170 #o U or't ha. 400b, MUSS 7u 70. 0.000bon all, mis Ii.0 vi, 1i MR P" Willi 16 '15i IN*' � g Aft &* �orrp� i rype FOlt.Type� wd �,waod so zkorltl *14hing Insulation -RVMU___ . 100,9� valutill A*,tubly, U.factor (altlic, jial, otc, R-3,0r will n�­T- Roof Floor Floor I -slab fl, I lkilforcement Agency Alternative to Sealed Ducts and TXVs (SeePaokVcC or D Alternative Package Features forproject Climate zojie�l :01i a- 11t;-A c, Name: Joan D. Hacker ow ZL02L.S3-�tt(ttor SEER, Heal:ing. insu-Form. Inc. Title: 4-4, 68255 Corta Road Agency: Cathedral City, CA 92234 A:TtRHkAT.,NG SYSTFMq Telephone: (760) 324-0216 ,. . I . Z IFF!Rk kr#wls !X 111011 1", 1,41 b66001.4 40, 1! Stamp iand 441 10016 ip ." f� 4 - " �, � Q FQ L R9W_Mft0_A1WMk1�a -W,011PRIA .44.2 am w4wift" for _ rin !ij �1�r ore omrp,�4 w 11 R-Lalit ow �70rvrlo f, insu *ul000iis 0", 4rawhw 1`19y External Rated' P9 WORM. 10. b Tank Tank 1,y 9. 'POO Wato. Heati:r W, 4000 and -Obisr�-Ind ! - At ­�o 4. '04 OR -bet v .1o: obstaved, 64 10"IF4046- and Rr, llw1gs; 44* 25. 401bo -Ito art Distribution Namber inp Ut (kW 0 of, M qaturer to "Insulation t_� Ilium FENESTRATION t pq a for P*411000" ol-W .-Aftft tl An rc luil R1, es )PASM, r pMod 1 qed f� V th. *at lq"41%40� Tor I pja as dowk -4,6 ars, X -Alt b6aft0i'to'be 2 is" #W 'bi - be "VWW . , b4 fl­.'� IWO 81190111111111 to - id �st*dsttr�gft 1161d 060affiam --anO, Orel A of oil � "govii ".9'an"o nd. 4,11nd In and -4fe of -.4%, AM* AW0v0d m4-of odo4uato h l;Ihn*Q*;* Ad i* Ic -=�'Wall; ".ta -b"��** the. "4001"d.' In 2 lan or'.4*W.4tktai�'*iiR 1 th* Mth 'Sp", '041titin 46'thv illf- 0M ­ If _', pa_ id 1*400 eta"" a4i AD k !.a '149, 0" Q i;6tw4� of, kpw oy�4 bESCRIPTION, ENFORCEMENT Building Envelope Meas Minimum R-13 wall insulation in wood framed walls or equivalent V-Facmr in thinalfame waits t4m,notggul toLXtatior'"ailmalls). P14% n in loaned (loom. % §600),: SlabrodgetinsulatkAin -'Water absolptionmia no 8ftterthan o.r/*. wat"aptirtruisoil asionlato no greater than 2.0 LSM_0�gbl' 5 1: Dom and window& bi�U�6a conditioned and unconditioned spaces designed to lim "M Se. 2. Famnottion products ("t flold-fabriii") have labot witheatified "actor, oftliflod-solar !a" Gain coofficivat (81100).�kad instration ocittificastion. 3. 1sx1crior 4611; and' whuhi�sweubccstdpped; all joim� and paticurstions casiked and sested, vtipe� harri-s: § in Climate Zones 14 and 16 only. I specJ4 infiltration lukoerlitstafted to Comply With § 1$1 meets Commission 4ualh� standards. 1$1)(6): 'histalladim ofV4ropla*, Decorative Gas Appliances and Gas Loss, b. Oxaskitair intakewith damper and control a. Fluedamparand comro� - 2, Nd continuous burninFgas olor-lights allowed. §,1l04I-l3-`HVAC'oa ipment;yaur heinersshowtbeads and,' fatiomeerfifidd by -the Commission. inacebidancevAth ASHMI SMACNAorACCA, eating an&- "14)4 sysnnog� 1500�-PipiAmitank insulation rav'2,With an EnorgyFattor ton than 0.54 must be externallywrapped with loot-d-pipos closest to water boater tank; nonomokikulating systoms,insulatod (R,,4 or greater) 1,back-up�uinks 6r War$ ,ysu�m, unfirodstorage tanks, or othor indirect hot water tanks have R42 R- iti ctimbined mun,italtioxtomal insulation. A -All 6adodor.4x*od piping insulated ln,rOcirculafin -section ofhot water systems. ,$�Coofi sysrempipitigbolow55PFinsulatod. heating source and indirect hot water tank. ­t nc:Atcr�jvmtt.TMINIMUM,"C.EC'STA-NDARDS.� ;Foronoll gas orgy resisnuicc; and�hoa, list Of NOW, '-fie(OF: 'Wlargegas storage water hcaters (Mcd input or greater than 7 5,000 Stit/hr), list P ated fnpia, Itteovet y crtic J iojt And Standby Loss iasianttnOous gas wincr',hointIm, list rated input y Nf�- IAL FFA.TtJRES (addi�xfra shects, 2�ckage C and D: TXVs or Cuitaini4l 030valcrit, Sealed bucts, Radiant Rarrii ifiricomary). P` pti appyoved Not, d;[k:� sqjft, ers (see� installation requirements for radiant barrj,'grs in. the 1,999 Resideatial�mariusl), PitckageC: thermal MUS (thertruil'mass Woe coverin thicknl� 1 `11 - . - Is. Tnwll nMJW6_,;Q-,, - ... _,�IFnt, ; :, / . . �'? I S, 'wN uesClyplioul, 2. IJ "Woo!" or min 6% open all ov. *#111111ad -Weldem, using ----------------- *61, all -6 "M X to Provld4 L "U.0 j�4_4 d/ an U *11- Id AQL_QW 'E 11114"MAJI, AWM~ N* F,�Tiesatation oritwr Ki, ent ration U�Faotor Lielaostraition "Viac roni .Left Rear 11 0