HomeMy WebLinkAbout26 Civic Center Plz - REV 8 - PlanST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A0.0
COVER SHEET
SANTA ANA LIBRARY RENOVATION
PROJECT NUMBER: 22-1380
26 CIVIC CENTER PLAZA, CITY OF SANTA ANA, 92701
PERMIT/ CONFORM SET
AUGUST 02, 2024
PROJECT TEAM
ARCHITECT:CIVIL:LANDSCAPE:
STRUCTURAL:
GROUP 4 ARCHITECTURE RESEARCH +
PLANNING:
211 LINDEN AVENUE
SOUTH SAN FRANCISCO, CA 94080
T: (650) 871-0709
CONTACT: DAVID SCHNEE
KPFF
140 NEWPORT CENTER DRIVE
SUITE 100
NEWPORT BEACH, CA 92660
T: (949) 478-8805
CONTACT: GRANT KAI
TERRAIN INTEGRATION
143 S.OLIVE STREET
ORANGE, CA 92866
T: (714) 724-9814
CONTACT: STEPHANIE SHERMOEN
KPFF
18400 KARMAN AVE
SUITE 600
IRVINE, CA 92612
T: (949) 252-1022
CONTACT: BILL THORPE
MEP:HISTORIC ARCHTECT:
ACOUSTICS & TELECOM:
MEP CALIFORNIA ENGINEERING CORP.
1929 MAIN STREET
SUITE 980
IRVINE,CA 92614
T: (949) 516-6487
CONTACT: TOM PRESTON
PAGE & TURNBULL
523 WEST 6TH STREET
SUITE 1013
LOS ANGELES, CA 90014
T: (213) 221-1203
CONTACT:JOHN LESAK
SMITH FAUSE & MCDONALD
351 8TH STREET
SAN FRANCISCO, CA 94103
T: (415) 255 9140
CONTACT: PETER A. MCDONALD
PROJECT SCOPE OF WORK:
THE PROPOSED PROJECT IS A LIBRARY RENOVATION
OF BASEMENT, 1ST AND 2ND FLOORS WITH
EXTERIOR WORK.
THE SCOPE OF WORK INCLUDES ASSOCIATED SITE
WORK FOR SURFACE PARKING, PATHWAYS AND
LANDSCAPEING, ADDITION OF ACCESSIBLE
ELEVATOR; REPAIR AND REPLACEMENT OF NORTH
FACING WINDOWS; REPAIR OF MARBLE FACADE;
RENOVATION OF INTERIOR SPACES.
LOCATION MAP:
SANTA ANA LIBRARY
DEFERRED SUBMITTALS:
1. AUTOMATIC FIRE SPRINKLERS-PLANS AND
CALCULATIONS
2. FIRE ALARM SYSTEM
3. WORK OF DIVISION27: TELECOMINICATIONS
INCLUDING.
a.SUPPORT AND SEISMIC RESTRAINT
b.EQUIPMENT ANCHORAGE
SEPARATE PERMIT BEFORE
START OF WORK:
SHORING - The Sub-Contractor shall obtain a separate
permit before start of work.
ALTERNATE 1: BASEMENT LIGHTWELL AND
SKYLIGHTS: AT THE BASEMENT LEVEL, EXCAVATE
FOR THREE LIGHTWELLS WITH CONCRETE WALLS
AND SKYLIGHTS. SEE PLANS AND DETAILS.
ALTERNATE 2: SOUTH TRELLIS: AT THE SOUTH
PLAZA, PROVIDE FOOTINGS AND STEEL TRELLIS
STRUCTURE WITH LETTERS (SIGNAGE). SEE SHEETS
A2.5-10, S2.4-2, S4.2-2
ALTERNATE 3: RELOCATE 3 PALM TREES. PROTECT,
REMOVE, STORE AND MAINTAIN, REPLANT.
GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE
"STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION" AS WRITTEN AND PROMULGATED BY THE
2018 EDITION OF SOUTHERN CALIFORNIA CHAPTER OF THE
A.P.W.A.
A.G.C.C. JOINT COOPERATIVE COMMITTEE HEREIN REFERRED
TO AS THE STANDARD SPECIFICATIONS AND THE CITY
OF SANTA ANA STANDARD PLANS & SPECIFICATIONS (UNLESS
SPECIFICALLY NOTED OTHERWISE OR IN THE SPECIAL
PROVISIONS FOR THIS PROJECT).
2. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND
UTILITY OR STRUCTURE SHOWN ON THESE PLANS ARE
OBTAINED BY A SEARCH OF AVAILABLE RECORDS. NO
CERTIFICATION IS MADE AS TO ACCURACY OR
THOROUGHNESS OF THESE RECORDS.
APPROVAL OF THIS PLAN BY THE CITY OF SANTA ANA DOES
NOT CONSTITUTE AN EXISTENCE OR NONEXISTENCE OF ANY
UNDERGROUND UTILITY OR SUBSTRUCTURE WITHIN THE
LIMITS OF THIS PROJECT. IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO VERIFY THE LOCATION OF ALL EXISTING
UNDERGROUND UTILITIES (BY POTHOLING OR OTHER MEANS).
THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE
ALERT (811) 48 HOURS BEFORE ANY EXCAVATION.
FA-07102
APPROVALS:
NABIL SABA, PE, EXECUTIVE DIRECTOR DATE
PUBLIC WORKS AGENCY
RUDY ROSAS, CITY ENGINEER DATE
BRIAN STERNBERG DATE
LIBRARY SERVICES DIRECTOR
PREPARED UNDER THE SUPERVISION OF:
DAVID SCHNEE, LICENSE C-27893 DATE
2024-04-30
ALL STAMPS AND SIGNATURES ARE DIGITAL FOR ALL SHEETS
CL
CL
4"
M
I
N
.
4" MIN.
FULL 90 MIL CIM 1000 SYSTEM
CIM 61TN EPOXY PRIMER
CIM SCRIM FABRIC SET IN WET
CIM MATERIAL
CIM 1000TG CANT STRIP
(E) VAULT CONCRETE
WALL
DRAINAGE PIPE PENETRATING
(E) VAULT CONCRETE WALL
LIGHTING BOLLARD
POST
ELECTRICAL CABLE
1"X4" PRESSURE-TREATED
SLEEPER
BOARD. MOUNT TO CONCRETE
SLAB
MI
N
.
6"
8 1/4"X7/8"X8' DECKING BOARD.3/16"
EXPANSION SPACE BETWEEN
BOARDS AND 1/4" EXPANSION SPACE
ON ALL BUTT ENDS.
CONCRETE SLAB
(4) 3/8” WEDGE ANCHOR SIMPSON
OR EQ.
LIGHTING BOLLARD
POST
ELECTRICA CABLE
4x4 PRESSURE-TREATED JOIST.
8 1/4"X7/8"X8' DECKING BOARD.3/16"
EXPANSION SPACE BETWEEN
BOARDS AND 1/4" EXPANSION SPACE
ON ALL BUTT ENDS.
8X8 CONCRETE FOOTING WITH Z-
MAX STRAP
(4) 3/8” WEDGE ANCHOR SIMPSON
OR EQ.
SECTION - LF2 INSTALLED @ DECKING ON CONCRETE SLAB
(LINEAR)
SECTION - LF2 INSTALLED @ AT ROUND DECK
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A1.1-3
SOUTH SITE PLAN
DETAILS
3" = 1'-0"1 CONCRETE WALL PEPE PENETRATION DETAIL
#310
RFI
3" = 1'-0"2 LF2 INSTALLATION DETAIL @ WOOD DECKS
#380
RFI
R
FE
C
FE
C
FE
C
DW
FE
C
FE
C
01
A3.4-1
12
345678910
C
D
E
F
G
H
A5.0-1
5
1
A5.0-3
16
STAFF
OFFICE
001
ARCHIVES
002
MECH-ABAN.
008
ELEVATOR-ABAN.
007
FIRE AL.RM
006
MECH
003
ALL GENDER
RESTROOM
010
OFFICE
012
OFFICE
013
STAFF
MEETING
ROOM
014
OFFICE
015
ELEV.
CONTROL
018
03ST-E
019
D24
B24aB24aC24aC24a
C24aC24aB24a
(E) ELEV.
OFFICE
017
08060806
STAFF
BREAK
ROOM
004
(E) ELEV.
CONTROL
RM.
005A
G24a
001
006-E007-E008-E
i015
10' - 3 3/8"
ELECTRICAL
019
014
0806
i014
OFFICE
016
018
019A
002A
018
A7.3-1
5
STORAGE
005
005A-E
ST-01ST-02
ST-03
5'
-
7
1
/
2
"
D24
D24
D24
D24
G26a
G26a
G26a
C24
D24
C24a
G26a
005
D
C24a
A2.5-8
3
9
VESTIBULE
005B
UP
UP
UP
C24a
C24a
4' - 5"
ALIGN F.O.F
C24
C24a
1058
0745
0745
2307
1407
A5.0-5
3
016 017
ST2 ST1
015
i012
012
i016 i017
A7.3-25
i013
013
1068
1068
2309
1069
STORAGE
023
0806 08060806
G24a
G24a
G24a
G24a
A5.0-1 4
1017
101710171017
10181018
1017
10181018
5
6
4TYP.
TYP.
TYP.
TYP.
#006
ASI
#006
ASI
#006
ASI
#006
ASI
#006
ASI
F14a #51
RFI
#51
RFI
021
C24 023
011
C24a F14a
F14
G24a
C24aC24
002
010
#019
ASI
#019
ASI
F14a
F14a
F14a
C24a
F14
C24a
C24a
F14a
#020
ASI
#020
ASI
#020
ASI
S
0943094309430943
F14
ALL GENDER
RESTROOM
011
4
A1.2-38
A1.2-3
022
#173.1
RFI
003
003A
#298
RFI
#287
RFI
#287
RFI #287
RFI
#311
RFI
03ST
1' - 2 1/2"
A2.5-8
6
A2.5-8 1
#348
RFI
18
"
M
I
N
.
#358
RFI
#358
RFI#358
RFI
004
#311.1
RFI
B22 #405
RFI
7'
-
5
1
/
2
"
WALL TYPE LEGEND
EXISTING WALL, TO REMAIN
NEW WALL
1-HOUR FIRE RATED WALL
NEW FURRED WALL
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A2.4-1
FLOOR PLAN-
BASEMENT 1/8" = 1'-0"1 FP00 - BASEMENT FLOOR PLAN
523 W 6 th Street,
Suite 1013,
Los Angeles, CA 90014
KEYNOTE
NO.KEYNOTE TEXT
0745 WATERPROOFING REMIDIATION FOR WATER
INFILTRATION
0806 INTERIOR STOREFRONT SYSTEM
0943 LEVEL 4 GYPSUM BOARD SURFACES FOR
EXISTING WALLS TYP, U.N.O. SEE SPECS #09 2900
3.5
1017 CORNER GUARD
1018 BUMPER RAIL
1058 COMPACT SHELVING (MANUAL) CONCRETE SLAB,
SEE 2/S7.0-1
1068 EXISTING STAIRS, SEE HISTORIC BUILDING
CODES PER NOTE ON A0.4-0
1069 (E) EXTERIOR VAULTS WITH EXTERIOR ACCESS
ONLY
1407 PASSENGER ELEVATOR
2307 EXHAUST DUCT TO ROOF (E)
2309 AIR INTAKE VENTS WITH CONNECTION TO
UNDERSLAB DUCT TUNNELS. S.M.D.
#006
ASI
FE
C
FE
C
FEC
A3.1-101
A3.4-1
12345678910
C
D
E
F
G
H
2
A7.0-1
1
YOUNG
ADULT
211
A7.0-1
1
3
A7.0-1
HISTORY
222
STUDY
202
VESTIBULE
SEATING
200A
STUDY
201
ALL GENDER
RESTROOM
2T1
ALL GENDER
RESTROOM
2T2
STAFF
RESTROOM
2T3
ADULT
STACKS
200
STAIR 3
2S3
STUDY
220
STAFF
MEETING
ROOM
221
219
A2.5-7
12
A7.3-1
3
B24a
B24a
B24a
B24a
B24
B24aB24a
B24a
C24a
B24a
B24a
B24a
(E) ELEV.
ACC. RAMP
OPEN TO BELOW
JAN.RM
217
5' - 11 5/8"4' - 4"8' - 3"
217-E
212
212A
G1.2-3 6
STORAGE
200B
101
102
103105
106
107
201
202
203
204 205 206 207 208
210
104
OFFICE
223
OFFICE
226
MAKER
STORAGE
216
200B
DNDN
DN
UP
UP
WATER DAMAGE AT WOOD CORNICE
TO BE REPAIRED IN NORTHWEST CORNER
211A
STAFF
OFFICE
224
YA STUDY
BOOTH
211A
A5.0-2
14
A5.0-2
13
10
A5.0-2
15
A5.0-1
14
A5.0-1 8
A5.0-2
12
A5.0-2 8
11
6
2
A5.0-13
218i220
i201
i211
A3.1-1
4
A3.1-1
3
A3.1-1 2
A3.1-1
5
A5.0-3
15
A5.0-3
2
221 B24a
223
A5.0-3
11
OFFICE
225
226 225
0806
0806 0806
0806
0806
7
A5.0-35
A2.5-93
ELEC. RM.
218
2T3
ST-01ST-02
ST-03ST-05
B24a
B24a
B24a
B24a
B24a
B24a
B24a
F14a
F14a
F14aF14a
G26a
B24a G26a
G26a
G26a
G24a
G24a
G24a
B24a
F12
B24a
B24a
F14a
B24a
B24a
211B224
DN
DN
i211A
211C
1
A2.0-13
i202
i221
0806
DN
F14a
A24
A24
A24
10' - 1 1/2"
A5.0-21 5
EXISTING STAIRS,
SEE HISTORIC
BUILDING CODES
PER NOTE ON
A0.4-0
EXISTING STAIRS,
SEE HISTORIC
BUILDING CODES
PER NOTE ON
A0.4-0
C24a
B24a
8'
-
8
3
/
4
"
1'
-
2
1
/
4
"
17' - 7"10' - 0"
4'
-
9
"
B24
0940
0554
1407
2307
ALIGN F.O.F
B26
B26
202 201
220
VIDEO
RECORDING
BOOTH
214
VIDEO
EDITING
BOOTH
213
211
214 213
11
B24a
7
3
A5.0-5 2
MAKER
SPACE
212
9
4
222
15
G1.2-37
G1.2-38 G1.2-4
7
G1.2-3 9
G1.2-4
1017
F12
G1.2-8
3
4
G1.2-8
A8.8-210
1
A5.0-6
5
A5.0-6
2T2 2T1B24a
F14a
B24a
#37
RFI
1074
G24a
#48
RFI
#52
RFI
#48
RFI
#020
ASI
F14
209
#020
ASI
#020
ASI
#020
ASI
#020
ASI
#020
ASI
#020
ASI
0560
F12 F12
F10
F10
F12
F12
F12
F12
F10
F12
F10
F12
F12
F10 F12
F10
F12
F12
F12
F12F12
F12
F12
F12
F10
F12
F12F12
F12
F10
F12
F12
F12
F12F12F12
F10
F10
F10
F12
F12
B24a16
F12
D038
D038
D038
#75
RFI
B24a
#64
RFI
#64
RFI
#49.1
RFI
#49.1
RFI
#236
RFI
17' - 5"18' - 0 3/4"18' - 4 1/2"18' - 0 3/4"17' - 5"
7'
-
2
"
211
A5.0-3 4 i
225-E
#282
RFI
Walls and doors need
1hr fire rated?
F12
12' - 0 1/4"
F12
F14ALIGN
#376
RFI
WALL TYPE LEGEND
EXISTING WALL, TO REMAIN
NEW WALL
1-HOUR FIRE RATED WALL
NEW FURRED WALL
1. REFER TO SHEET C1.2-0 FOR DETAILED DEMO ITEMS
SHEET NOTES:
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A2.4-3
FLOOR PLAN
-SECOND FLOOR
1/8" = 1'-0"1 FP02 - SECOND FLOOR PLAN
523 W 6 th Street,
Suite 1013,
Los Angeles, CA 90014
KEYNOTE
NO.KEYNOTE TEXT
0554 METAL RAILING WITH STAINED WOOD CAP TO
REMAIN DAMAGE AT WOOD CAP TO REPAIRED AS
NEEDED
0560 7" ALUMINUM PANEL, COLOR TO MATCH MULLION
0806 INTERIOR STOREFRONT SYSTEM
0940 STAINED WOOD PANELING AT MEZZANINE EDGE
TO REMAIN. STAINING AND VANDALISM TO BE
CAREFULLY REMOVED
1017 CORNER GUARD
1074 KEEP THE EXISTING PLASTER, BUILD NEW 2-1/2"
STUD WALL OUTSIDE OF PLASTER, AND ATTACH
TWO LAYERS OF TYPE X GYPSUM BOARD TO THE
NEW STUD WALLS TO MEET 1HR FIRE RATING
PER UL DESIGN V497
1407 PASSENGER ELEVATOR
2307 EXHAUST DUCT TO ROOF (E)
D038 (E) INSERT METAL CORNERS AT CORNERS,
APPLY PILASTER WITH METAL LATH TO SMOOTH
SURFACE
#52
RFI
#020
ASI
#020
ASI
12
345678910
C
D
E
F
G
H
STAFF
OFFICE
001
ARCHIVES
002
MECH-ABAN.
008
ELEVATOR-ABAN.
007
FIRE AL.RM
006
MECH
003
ALL GENDER
RESTROOM
010
OFFICE
012
OFFICE
013
STAFF
MEETING
ROOM
014
OFFICE
015
ELEV.
CONTROL
018 (E) ELEV.
OFFICE
017
STAFF
BREAK
ROOM
004
(E) ELEV.
CONTROL
RM.
005A
ELECTRICAL
019
OFFICE
016
STORAGE
005
ST-01ST-02
ST-03
5'
-
7
1
/
2
"
VESTIBULE
005B
ALIGN F.O.F
STORAGE
023
ALL GENDER
RESTROOM
011
5'
-
4
"
7'
-
6
1
/
4
"
2'
-
5
"
6' - 5 3/4"
4' - 7 1/4"
10
'
-
7
1
/
2
"
6'
-
8
1
/
4
"
ALIGN ALIGN ALIGN ALIGN ALIGN
5' - 3"7' - 2 1/4"5' - 5 1/4"17' - 5 1/2"5' - 5"12' - 8 1/2"12' - 5 1/4"12' - 8 1/2"
ALIGN F.O.F.
ALIGN
5'
-
8
"
5'
-
9
1
/
2
"
11
'
-
2
1
/
4
"
2'
-
3
3
/
4
"
7'
-
0
3
/
4
"
4' - 11 1/4"1' - 5 3/4"10' - 8 3/4"
4' - 3 1/2"7' - 8 1/2"
ALIGN F.O.F.
2' - 9 1/2"34' - 1 1/2"
ALIGN F.O.F.
ALIGN F.O.F.
6' - 5"
2'
-
0
"
24
'
-
1
1
/
2
"
9'
-
2
1
/
2
"
2' - 5 1/2"
ALIGN F.O.F
ALIGN
F.O.F
ALIGN
F.O.F
#287
RFI
#348
RFI
5'
-
0
"
#311
RFI
1'
-
3
3
/
4
"
#173.2
RFI
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A2.4-6
DIM CONTROL
PLAN - BASEMENT
1/8" = 1'-0"1 FP00 - BASEMENT FLOOR DIM CONTROL PLAN
#64
RFI
12345678910
C
D
E
F
G
H
YOUNG
ADULT
211
HISTORY
222
STUDY
202
VESTIBULE
SEATING
200A
STUDY
201
ALL GENDER
RESTROOM
2T1
ALL GENDER
RESTROOM
2T2
STAFF
RESTROOM
2T3
ADULT
STACKS
200
STAIR 3
2S3
STUDY
220
STAFF
MEETING
ROOM
221
ACC. RAMP
OPEN TO BELOW
JAN.RM
217
STORAGE
200B
OFFICE
223
OFFICE
226
MAKER
STORAGE
216
STAFF
OFFICE
224
YA STUDY
BOOTH
211A
OFFICE
225
ELEC. RM.
218
ST-01ST-02
ST-03ST-05
ALIGN F.O.F
VIDEO
RECORDING
BOOTH
214
VIDEO
EDITING
BOOTH
213
MAKER
SPACE
212
13' - 2 1/2"
5'
-
6
"
6'
-
1
1
"
9'
-
5
3
/
4
"
35
'
-
1
3
/
4
"
ALIGN
F.O.F.
13' - 7 1/4"7' - 11 1/4"
ALIGN
F.O.F.
2'
-
2
1
/
4
"
17' - 2 1/2"10' - 6"8' - 2 1/2"2' - 2 1/2"8' - 5"1' - 8 1/4"8' - 5 1/2"
ALIGN
F.O.F.
2' - 1 1/2"17' - 8"
5'
-
8
3
/
4
"
5'
-
2
1
/
4
"
11
'
-
5
"
ALIGN
F.O.F.
1' - 7"4' - 8"11' - 7 1/4"5' - 0"
ALIGN F.O.F.
W. EXISTING
BULKHEAD FINISH
ALIGN
F.O.F.
ALIGN
F.O.F.
ALIGN F.O.F.
ALIGN
F.O.F.
ALIGN
F.O.F.
4' - 3 1/2"8' - 4 1/4"
9'
-
7
"
V.
I
.
F
.
3'
-
2
1
/
4
"
11
'
-
8
1
/
2
"
18' - 1 1/2"9' - 3 3/4"26' - 5"6' - 1 1/2"4' - 5 3/4"
ALIGN F.O.F.W. EXISTING
BULKHEAD FINISH
V.
I
.
F
.
5'
-
5
3
/
4
"
1'
-
0
3
/
4
"
4' - 5 1/4"
ALIGN F.O.F.
ALIGN F.O.F.
1'
-
5
1
/
4
"
2'
-
3
1
/
4
"
15' - 1"
4'
-
5
"
ALIGN F.O.F.
1'
-
9
3
/
4
"
6'
-
3
3
/
4
"
V.
I
.
F
.
5'
-
5
"
6' - 9 3/4"9' - 11 1/4"
ALIGN
F.O.F.
ALIGN
F.O.F.
ALIGN
F.O.F.
1' - 5 1/4"11"
ALIGN F.O.F.
#198
RFI
#198
RFI #198
RFI
#198
RFI
#198
RFI
#198
RFI
#198
RFI
#198
RFI
4' - 7 3/4"
#214
RFI
#373
RFI
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A2.4-8
DIM CONTROL
PLAN - SECOND
FLOOR
1/8" = 1'-0"2 FP02 - SECOND FLOOR DIM CONTROL PLAN
#64
RFI
7
7
8
F
G
H
A5.0-4 2
5
8
A5.0-46
1
4
MEN RR
110
WOMEN RR
111
JAN. RM
112
3
110
111
2'
-
6
"
2'
-
6
1
/
2
"
1207
4'
-
5
1
/
4
"
10' - 9 1/4"
F14a
B24a
C24a
F14
C14a
1209B
1210
2208
1207
1210
AL
I
G
N
3'
-
6
1
/
2
"
1205A
2208
2208
1205B
2208
ALIGN
C24a
F14a
F14a
F14
F14
AL
I
G
N
C14a
C14a
F14
B24
B24a
G26a
17
"
M
I
N
.
18
"
M
A
X
.
3'
-
6
1
/
2
"
2'
-
6
1
/
2
"
36
"
C
L
R
.
60
"
M
I
N
F
.
O
.
F
.
9' - 2 3/4"5' - 11"
5'
-
1
0
1
/
2
"
ALIGN
1066
3'
-
0
1
/
2
"
1208F
1208F
1208J
1205A
1205A
2206B
2203
2203
2206B
5'
-
1
1
/
4
"
59
"
M
I
N
36
"
M
I
N
1205A
2208
36" MIN
19
"
M
A
X
17
"
M
I
N
3'
-
1
"
1'
-
6
1
/
2
"
MA
X
.
3'
-
1
"
1208F
1208F
44" CLR.
1208J
1066
1066
1066
1210
3'
-
6
1
/
2
"
2208
2208
2208
F14a
4' - 0" CLEAR
5'-0" MIN CLEAR
1208G
#020
ASI
2203
1208J
#401
RFI
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
REFER TO SHEET A0.2 FOR ARCHITECTURAL
SYMBOLS, WALL TYPE LEGEND, ABBREVIATIONS.
COORDINATE ALL ACCESSIBILITY COMPLIANCE
REQUIREMENTS, SEE SHEET A0.5 SERIES.
REFER TO ENLARGED PLANS FOR ADDITIONAL
DIMENSIONS.
REFER TO SHEET A9.0 SERIES FOR INTERIOR
PARTITION TYPES AND DETAILS.
REFER TO SHEET A4 SERIES FOR FINISH PLANS.
ALL EXTERIOR AND INTERIOR STEEL EXPOSED TO
PUBLIC SHALL BE A.E.S.S. REFER TO A-- A.E.S.S.
CATEGORIES.
COORDINATE PENETRATIONS WITH STRUCTURAL,
MECHANICAL, PLUMBING, CIVIL, ELECTRICAL AND
TELECOM.
MECHANICAL, LIGHTING, A/V FIXTURES SHOWN FOR
COORDINATION. S.M.D,. S.E.D., S.T.D. FOR COMPLETE
QUANTITY AND EXTENTS OF FIXTURES. NOTIFY
OWNER'S REP AND ARCHITECT OF ANY CONFLICTS OR
DISCREPANCIES PRIOR TO PROCUREMENT AND
INSTALLATION.
REFER TO SHEET A2.6-1 FOR DOOR SCHEDULE.
REFER TO A0.3-0 FOR GENERAL NOTES.
PROVIDE BACKING IN ALL WALLS AS REQUIRED FOR
SHELVES, CABINETS, BRACKETS, GRAB BARS,
HANDRAILS, ETC. SEE A9.01
SEE A0.6-1 FOR TYPICAL RULES FOR DETERMINING
HEIGHTS AND LOCATIONS
SEE A0.5-1 FOR DISABLE ACCESS COMPLIANCE
MOUNTING HEIGHTS AND LOCATIONS
ALIGN NEW WALL FINISH WITH EXISTING WALL FINISH
SHEET NOTES:
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A2.5-5
ENLARGED FLOOR
PLANS
RESTROOMS
KEYNOTE
NO.KEYNOTE TEXT
1066 PHENOLIC TOILET PARTITION
1205A GRAB BAR, 36" LENGTH BACK BAR, 42" LENGTH
SIDE BAR, PROVIDE BACKING
1205B GRAB BAR, 42" LENGTH BOTH SIDES, PROVIDE
BACKING
1207 ELECTRIC HAND DRYER
1208F TOILET PAPER & SEAT-COVER DISPENSER,
PARTITION MOUNT, SERVES BOTH
COMPARTMENTS, WOMEN'S COMBO UNIT
1208G TOILET PAPER & SEAT-COVER DISPENSER,
PARTITION MOUNT, MEN'S COMBO UNIT
1208J TOILET PAPER & SEAT-COVER DISPENSER,
PARTITION MOUNT, FLUSH AGAINST PARTITION
ON ONE SIDE, COMBO UNIT FOR ACCESSIBLE
1209B WALL MOUNTED URINAL PARTITION
1210 FOLD-DOWN BABY CHANGER
2203 URINAL, S.P.D.
2206B LAVATORY, RAMP SINK, S.P.D. COUNTERTOP
MOUNTED FAUCET, SOAP DISPENSER AND HAND
DRYER
2208 PLUMBING, S.P.D.
1/2" = 1'-0"4 ENLARGED PUBLIC RESTROOMS - 1ST FLOOR
RESTROOM ACCESSORIES SCHEDULE
KEYNOTE
NO.KEYNOTE TEXT MODEL
1066 PHENOLIC TOILET PARTITION SEE SECTION 102113
1205A GRAB BAR,36" LENGTH BACK BAR, 42" LENGTH SIDE BAR, PROVIDE BACKING BOBRICK B-5806 x 36 (BACK); B5-806 x 42
(SIDE)
1205B GRAB BAR, 42" LENGTH BOTH SIDES, PROVIDE BACKING BOBRICK B5-806 x 42 (SIDE)
1207 ELECTRIC HAND DRYER PINNACLE SURFACE MODEL P3-12S
1208D TOILET PAPER & SEAT-COVER DISPENSER, RECESSED, ON LEFT SIDE, COMBO UNIT FOR
ACCESSIBLE
BOBRICK B-3091
1208E TOILET PAPER & SEAT-COVER DISPENSER, RECESSED, ON RIGHT SIDE, COMBO UNIT FOR
ACCESSIBLE
BOBRICK B-3092
1208F TOILET PAPER & SEAT-COVER DISPENSER, PARTITION MOUNT, SERVES BOTH COMPARTMENTS,
WOMEN'S COMBO UNIT
BOBRICK B-357
1208G TOILET PAPER & SEAT-COVER DISPENSER, PARTITION MOUNT, FLUSH AGAINST PARTITION ON
ONE SIDE, COMBO UNIT FOR ACCESSIBLE
BOBRICK B-3579
1208J TOILET PAPER & SEAT-COVER DISPENSER, PARTITION MOUNT, FLUSH AGAINST PARTITION ON
ONE SIDE, COMBO UNIT FOR ACCESSIBLE
BOBRICK B-30919
1209B WALL MOUNTED URINAL PARTITION SEE SECTION 10 2113
1210 FOLD-DOWN BABY CHANGER KOALA KB310-SSRE
2206B LAVATORY, RAMP SINK, S.P.D. COUNTERTOP MOUNTED FAUCET, SOAP DISPENSER AND HAND
DRYER
SEE PLUMING DRAWINGS
#401
RFI
#401
RFI
#401
RFI
#401
RFI
#401
RFI
#401
RFI
FEC
FE
C
12345678910
C
D
E
F
G
H
WALLS
BASE
FLOOR
N E
S W
N E
S W
GREAT READING
ROOM101
P-1
R-1
C-5, MT-1A, MT 1-B
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
ADULT STACKS119
P-1
N/A
C-1
P-1
P-1 P1
R-1
R-1
N/A
WALLS
BASE
FLOOR
N E
S W
N E
S W
YOUTH STACKS118
P-1
N/A
C-1
P-1
P-1 P-1
R-1
N/A
N/A
WALLS
BASE
FLOOR
N E
S W
N E
S W
YOUTH STACKS117
N/A
R-1
C-2C
P-1
P-1 N/A
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
STORAGE108
P-1
R-1
CO-1
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
MEN RR110
PT-2, P-1
T-1
PT-1
PT-2, P-1
PT-2, P-1 PT-2, P-1
T-1
T-1
T-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
WOMEN RR111
PT-2, P-1
T-1
PT-1
PT-2, P-1
PT-2, P-1 PT-2, P-1
T-1
T-1
T-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
ALL GENDER
RESTROOM115
TW-1, P-1
T-1
PT-1
TW-1, P-1
TW-1, P-1 TW-1, P-1
T-1
T-1
T-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
ALL GENDER
RESTROOM114
TW-1, P-1
T-1
PT-1
TW-1, P-1
TW-1, P-1 TW-1, P-1
T-1
T-1
T-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
MECH.113
P-1
R-1
CO-1
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
BOOKMOBILE
ROOM103
P1
R-1
C-4, R-1
P1
P1 P1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
STAFF-WOMEN
RESTROOM104
PT-2, P-1
T-1
PT-1
PT-2, P-1
PT-2, P-1 PT-2, P-1
T-1
T-1
T-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
STAFF MEN
RESTROOM105
PT-2, P-1
T-1
PT-1
PT-2, P-1
PT-2, P-1 PT-2, P-1
T-1
T-1
T-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
I.T.106
P-1
R-1
CO-1
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
BOOKSTORE109
P-1
R-1
C-1
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
SORTING123
P1
R-1
C-4, R-1
P1
P1 P1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
FAMILY ZONE121
P-1
R-1
C-3B, C-3C
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
NURSING/SENSORY116
P-1
R-1
C-3C
P-1
P-5 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
STORAGE124
P-1
R-1
C3-A
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
OFFICE103A
P-1
R-1
C-4
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
VESTIBULE107
P-1
R-1
C5
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
MEETING/COMMUNITY
ROOM102
P-1
R-1
C-5
P-1
WP P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
VESTIBULE100
P-4
R-1
C-5
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
TODDLERS AND
INFANTS120
P-1
R-1
C-2A, C-2B
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
ELEVATOR219
N/A
R-1
CO-1
N/A
N/A N/A
R-1
R-1
R-1
P-4
P-5
WALLS
BASE
FLOOR
N E
S W
N E
S W
JAN. RM112
FRP
NO BASE
EXISTING
FRP
FRP FRP
NO BASE
NO BASE
NO BASE
ENTRANCE FLOOR MAT
MIN 10' L X 6' W
ENTRANCE FLOOR MAT
MIN 7' W X 6' L
10' - 0"6'
-
0
"
7' - 0"
6'
-
0
"
#020
ASI
#020
ASI #020
ASI
#020
ASI
#020
ASI
NEW TRAVERTINE
TILE MT-1A & MT-1B;
SEE 12/ A9.2-1 FOR
FLOORING STONE
TILE TRANSITION
#020
ASI
#020
ASI
#020
ASI
#020
ASI
#016
ASI
#016
ASI
#016
ASI
#016
ASI
WALLS
BASE
FLOOR
N E
S W
N E
S W
STAIR #2ST-2
P-1
R-1
RF-1
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
STAIR #1ST-1
P-1
R-1
RF-1
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
AV CLOSET102B
P-1
R-1
C-5
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
STORAGE102A
P-1
R-1
C-5
P-1
P-1 P-1
R-1
R-1
R-1
WALLS
BASE
FLOOR
N E
S W
N E
S W
STAIR #3ST-3
P-1
R-1
RF-1
P-1
P-1 P-1
R-1
R-1
R-1
#016.1
ASI
#016.1
ASI
#016.1
ASI
#016.1
ASI
#016.1
ASI
#016.1
ASI
#016.1
ASI
#016.1
ASI
WALLS
BASE
FLOOR
N E
S W
N E
S W
FIREPLACE ROOM122
P-1
R-1
C-1
P-1
P-1 P-1
R-1
R-1
R-1
#209
RFI
#209
RFI
13
'
-
9
3
/
4
"
16' - 7 1/4"
171°171°
3'
-
7
3
/
4
"
4'
-
0
1
/
2
"
2' - 0"
13' - 0"
2' - 0"
2' - 0"
13' - 0"
2' - 0"
17' - 0"17' - 0"
7'
-
5
"
7'
-
5
"
3'
-
4
1
/
2
"
3'
-
4
1
/
2
"
90°
90°
90°
90°
90°90°
90°
90°
90°
90°
90°
90°
90°
V.I.F
.
94°
C.L.
A B
A, B PARTS SHOULD BE SYMMETRICAL
W. C.L. BETWEEN GRIDS 5&6
DIMS NOTED HERE ARE FOR REF ONLY
AND SHOULD BE V.I.F.
90°
90°
90°
90°
INTERIOR FLOOR FINISH LEGEND
C-5:
CARPET TILE
C-2A:
CARPET TILE
CO-1:
SEALED CONCRETE
R-1:
RESILIENT FLOOR
MT-1A:
NEW TRAVERTINE FLOOR TILE LIGHT
PT-1:
PORCELAIN TILE
C-1:
CARPET TILE
C-2C:
CARPET TILE
C-3A:
CARPET TILE
C-4:
CARPET TILE
C-2B:
CARPET TILE
C-3B:
CARPET TILE
C-3C
CARPET TILE
C-6:
CARPET TILE
C-6A:
CARPET TILE
MT-1B:
NEW TRAVERTINE FLOOR TILE DARK
R-2:
RESILIENT FLOOR
#016
ASI
RF-1:
RUBBER FLOOR FOR STAIRS
#016.1
ASI
INTERIOR WALL FINISH LEGEND
AWP-1:TACKABLE ACOUSTIC WALL PANEL
FRP:FIBER REINFORCED PLASTIC PANEL
MB:MARKERBOARD
P-0: PTD. GYP BOARD CEILING/SOFFIT
COLOR, THE SAME PAINT AS P-1 TYPICAL U.O.N.
P-1: WALL COLOR, TYPICAL U.O.N.
P-2: BASEMENT OFFICE ACCENT COLOR
P-3:YOUTH/ MAKER RM ACCENT COLOR
P-4:HALLWAY/ STUDY ROOM ACCENT COLOR
P-5:ROOM ACCENT COLOR
P-6: VIDEO RECORDING ROOM GREEN WALL COLOR
TW-1:PORCELAIN TILE 4' HEIGHT TYP.
(SEE A5.0-0 FOR ADDITIONAL INFORMATION)
WP:WOOD VENEER PANEL
WG:CUSTOM ACOUSTIC WOOD GRILLE
INTERIOR BASE FINISH LEGEND
R-1: RUBBER BASE
T-1: PORCELAIN TILE BASE
1.SEE A4.0-1 FOR FINISH LEGEND
SCHEDULE AND NOTES.
SHEET NOTES:
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A4.1-2
FINISH FLOOR
PLAN- 1ST FLOOR
1/8" = 1'-0"1 NP01- FINISH FLOOR PLAN- FIRST FLOOR
MT-1
#020
ASI
#382
RFI
INTERIOR WALL FINISH LEGEND
MB
MARKERBOARD
AWP-1
TACKABLE ACOUSTIC WALL PANEL
PT-2
PORCELAIN TILE 4' HEIGHT TYP.
FRP
FIBER REINFORCED PLASTIC PANEL
WP
WOOD VENEER PANEL
P-1 PAINT
P-5 PAINT
P-2 PAINT
P-6 PAINT
P-3 PAINT
P-4 PAINT
#97
RFI
2' - 8"
5'
-
0
"
5'
-
5
"
2'
-
4
"
0911
2708
8"
4'
-
0
"
8"
10' - 1"2' - 8"SANTA ANA
CITY'S SEAL.
SEE G SERIES
FOR DETAIL
TV
15
A9.5-2
9' - 0"
EQ EQ EQ
2'
-
1
0
"
9
A9.6-2
2
A9.6-11070
2
A9.6-1
12
A9.6-2
1202
1071
1202
1'
-
1
0
"
7'
-
8
"
4'
-
8
"
#404
RFI
6' - 0"
2'
-
4
"
EQ EQ
EQ EQ
48
"
M
A
X
.
15
"
M
I
N
.
ADA
2'
-
1
0
"
1
A9.6-1
1072
12
A9.6-2
1202
1006
#405
RFI
3' - 5 1/2"
7'
-
1
1
/
2
"
211B
02
A9.3-1
01
A9.3-1
11
A9.3-1
1001
6' - 10"
2'
-
1
0
1
/
2
"
2
A9.6-1
9
A9.6-2
10
A9.6-2
1202
INTERIOR BASE FINISH LEGEND
R-1: RUBBER BASE
T-1: PORCELAIN TILE BASE
1.CITY'S SEAL REFER TO SIGGNAGE DRAWING (G. SERIES)
FOR GRAPHIC AND DETAILS
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A5.0-1
INTERIOR
ELEVATIONS
KEYNOTE
NO.KEYNOTE TEXT
0609 SOLID SURFACE COUNTER WITH BASE AND
UPPER CABINETS, SEE CASEWORK DETAILS A9.5
0806 INTERIOR STOREFRONT SYSTEM
0911 4"H WALL BASE, SEE FINISH SCHEDULE
1001 SIGNAGE, SEE G-SERIES DRAWINGS
1006 METAL LOCKERS ADA-COMPLIANT
1011 MARKER BOARD
1035 TACK BOARD
1070 DISHWASHER OFOI
1071 REFRIGERATOR OFOI
1072 VENDING MACHINE OFOI
1111 TV SCREEN, SEE TELECOM DWGS
1202 QUARTZ COUNTERTOP
2703 PROJECTOR SCREEN, SEE A/V DRAWINGS
2708 LCD MONITOR. SEE INT ELEVATIONS AND A/V
DRAWINGS
1/4" = 1'-0"6 IE - 102 MEETING/COOMUNITY ROOM - SOUTH
1/4" = 1'-0"10 IE - 102 MEETING COMMUNITY ROOM - NORTH
1/4" = 1'-0"1 IE - 004 STAFF BREAKROOM - EAST
1/4" = 1'-0"5 IE - 004 STAFF BREAKROOM - NORTH
1/4" = 1'-0"14 IE - 211A YA STUDY BOOTH - NORTH
1/4" = 1'-0"11 IE - 211A YA STUDY BOOTH - EAST
1/4" = 1'-0"3 IE - 211 YOUTH ADULT - WEST
1/4" = 1'-0"13 IE - 107 VESTIBULE - SOUTH 1/4" = 1'-0"2 IE - 102 MEETING/ COMMUNITY ROOM - PANTRY
1/4" = 1'-0"7 IE -211A YA STUDY BOOTH - SOUTH
WINDOW SCHEDULE - INTERIOR A5.0-1
WIN #LENGTH HEIGHT
GLAZING
TYPE
FRAME
MATERIAL
FRAME
FINISH SHADE TYPE
i210 4' - 0 1/2"7' - 0"DT AL PT N/A
i211 6' - 10"7' - 1 1/2"DT AL PT N/A
i211A 7' - 5"7' - 1 1/2"DT AL PT N/A
i212A 6' - 2"7' - 1 1/2"DT AL PT N/A
i213 8' - 1 1/2"10' - 0"DT AL PT N/A
i214 7' - 10 1/2"7' - 1 1/2"DT AL PT N/A
1/4" = 1'-0"9 IE -004 STAFF BREAKROOM - SOUTH
1/4" = 1'-0"8 IE- 201 STUDY ROOM - EAST
1/4" = 1'-0"15 IE - 211 YOUTH ADULT SOUTH
1/4" = 1'-0"4 IE-014 STAFF MEETING ROOM-EAST
#020
ASI
#020
ASI
1/4" = 1'-0"12 IE-102 MEETING/COMMUNITY ROOM
#262
RFI
#262
RFI
6-11 3/4"
SECOND FLOOR
-107' - 10 1/2"
(E) SOFFIT FROM VERTICAL FACE
OF BULKHEAD TO 8 ” TO REMAIN
(E) VERTICAL BULKHEAD AND TRIM
TO REMAIN
NEW CEILING
HEIGHT VARIES, SEE A6.0-3
SECOND FLOOR
-107' - 10 1/2"
8"
NEW CEILING
HEIGHT VARIES, SEE A6.0-3
NEW SOFFIT TO MATCH
AND ALIGN WITH EXISTING
SOFFIT HEIGHT ELEVATION,
TO CONFIRM IN FIELD
DEMO WALL HEIGHT TO TOP OF
EXISTING SOFFIT;
HEIGHT TO CONFIRM IN FIELD
KEEP THE UPPER PORTION
WAYFINDING SIGNAGE
7'-10"
8'-6"
SLIP TRACK
4" STUD WALL
ALIGN TOP OF JOINT TO
7'-10" (UNDERSIDE OF
OPENINGS)
PLASTER WITH METAL
LATH
16 GA NESTED
TRACK/STUD
7'-8"
NOTE:
1. SEE DETAIL 03 & 17 FOR TYP NOTES.
2. S.S.D FOR STRENGTHENING AND CONNECTION OF SUSPENDED STUD WALL AND CEILING
3. SELECT EITHER OPTION-A OR B FOR STUD CONNECTION FROM SOFFIT JOIST TO EXISTING STRUC BASED ON SITE CONDITIONS
4. SELECT EITHER OPTION-C OR D FOR ADDITIONAL VERTICAL STUDS ’ BRACING BASED ON SITE CONDITION
OPTION-A
OPTION-D
OPTION-C
OPTION-B
7'-10"
8'-6"
(3) #10 SMS TYP.,
U.N.O.
(E) STRUCTURE
(E) STUDS
6" BOTTOM TRACK
ATTACH TO EXISTING
WITH "L" BRACKET AND
SCREWS
3/4" REVEAL
WALL ANGLE AND
FASTENER
(BY SUBCONTRACTOR)
5/8" GYP. BD.
CROSSPIECE
WOOD GRILLE CEILING
(TYP)
4" STUDS
8'-8"
(E) PLASTER AND
ASSOCIATED
FRAMING
V.I.F.
3' - 2 1/4"
4" JOIST @ 16"
O.C.
INFILL PLASTER W.
METAL LATH
(4) #10 SMS @ DIAG.
BRACE TO VERT. STUD
CONNECTION, TYP.
NOTE:
1. S.S.D FOR STRENGTHENING AND CONNECTION OF SUSPENDED STUD WALL AND CEILING
2. SELECT EITHER OPTION-A OR B FOR STUD CONNECTION FROM SOFFIT JOIST TO EXISTING STRUC BASED ON SITE CONDITIONS
3. SELECT EITHER OPTION-C OR D FOR ADDITIONAL VERTICAL STUDS ’ BRACING BASED ON SITE CONDITION
"L" BRACKET WITH SELF TAPPING SCREWS
CEILING SUPPORT
JOISTS PER 16/S6.0-3
STUDS PER 16/S6.0-3
OPTION-A
OPTION-D
OPTION-C
OPTION-B
7'-10"
8'-6"
V.I.F.
3' - 2 1/4"
SLIP TRACK
4" STUD WALL
ALIGN TOP OF JOINT TO
7'-10" (UNDERSIDE OF
OPENINGS)
PLASTER WITH METAL
LATH
16 GA NESTED
TRACK/STUD
9'-6"
ACT CEILING WITH
T-BAR GRID
NOTE:
1. SEE DETAIL 03 FOR TYP NOTES.
2. S.S.D FOR STRENGTHENING AND CONNECTION OF SUSPENDED STUD WALL AND CEILING
3. SELECT EITHER OPTION-A OR B FOR STUD CONNECTION FROM SOFFIT JOIST TO EXISTING STRUC BASED ON SITE CONDITIONS
4. SELECT EITHER OPTION-C OR D FOR ADDITIONAL VERTICAL STUDS ’ BRACING BASED ON SITE CONDITION
OPTION-A
OPTION-D
OPTION-C
OPTION-B
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A5.0-6
INTERIOR
SECTIONS
1/4" = 1'-0"1 INTERIOR SECTION @ BULKHEAD, LEVEL 2
#30
RFI
1/4" = 1'-0"5 INTERIOR SECTION @ DEMO WALL NEXT TO RAMP, LEVEL 2
3" = 1'-0"20 IWA- EXISTING WALL TO GYP. BD. CEILING &OPENINGS
3" = 1'-0"3 IWA- EXISTING WALL TO WOOD SLAT&ACOUSTIC CEILING TILES
3" = 1'-0"17 IWA- EXISTING WALL TO GYP. WALL&T-BAR CEILING
#365
RFI
FE
C
FE
C
FE
C
FE
C
FE
C
12345678910
C
D
E
F
G
H
STAFF
OFFICE
001
MECH
003
ALL GENDER
RESTROOM
010
STAFF
MEETING
ROOM
014
OFFICE
013
OFFICE
012
ARCHIVES
002
ELEV.
CONTROL
018
FIRE AL.RM
006
ELEVATOR-ABAN.
007
MECH-ABAN.
008
OPEN TO
STRUCTURE
OPEN TO STRUCTURE
OPEN TO STRUCTURE
OPEN TO STRUCTURE
+7'-6"
(E) ELEV.
CONTROL
RM.
005A
STAFF
BREAK
ROOM
004
+7'-6"
OPEN TO
STRUCTURE
+9'-8 1/4"
+9'-8 1/4"
+9'-8 1/4"
+9'-8 1/4"
+9'-8 1/4"
OFFICE
015
OFFICE
016
OFFICE
017
STORAGE
005
SMOKE CONTAINMENT SYSTEM
#002
ASI
#002
ASI
#002
ASI
#002
ASI
+7'-8"
+8'-0"
+7'-6"+7'-2"
+7'-10"
+6'-2"+6'-2"+6'-2"+6'-2"+6'-2"+6'-2"
#020
ASI
#020
ASI
#020
ASI
#020
ASI
#002
ASI
#020
ASI
#020
ASI
#019
ASI
#019
ASI
#020
ASI
ALL GENDER
RESTROOM
011
4
A1.2-38
A1.2-3
9"
+7'-6"
30
'
-
3
"
EXISTING CABLE TRAY
SEE TN.6.1-0 EXISTING CABLE TRAY
SEE TN.6.1-0
9
A9.4-1
9
A9.4-1
2"2"
2"2"
#159.1
RFI
+7'-6"+7'-6"
#024
ASI
+8'-0"
#311
RFI
+7'-6"
+7'-6"
#357
RFI
#357
RFI #357
RFI
#357
RFI
#357
RFI
#357
RFI
+7'-6"+7'-6"+7'-6"
#357
RFI
#357
RFI
#357
RFI
#357
RFI
1'
-
1
1
"
1'
-
1
1
"
#377
RFI
#357.1
RFI
#405
RFI
#405
RFI
REFLECTED CEILING PLAN LEGEND
G-1:
GYPSUM BOARD CEILING PTD.
ACT-2:
2'X4' ACOUSTIC CEILING TILE
ACT-1:
1'X1' ACOUSTIC CEILING TILE
W-1:
CUSTOM WOOD GRILLE WITH ACOUSTIC
BACKING
OPEN TO STRUCTURE ABOVE
C -1:
CEMENT PLASTER
(E) CEILING TO REMAIN
#002
ASI
1.
2.
LIGHT FIXUTRE AND LIGHTING SCHEDUDLE REFER TO
ELECTRICAL DRAWING (E. SERIES) FOR GRAPHIC AND
DETAILS
NOT ACCEPTABLE TO RUN THE CONDUIT EXPOSED#002
ASI
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A6.0-1
REFLECTED
CEILING PLAN-
BASEMENT
1/8" = 1'-0"1 RCP00-REFLECTED CEILING PLAN-BASEMENT
#159
RFI
#159
RFI
#159
RFI
#159
RFI
#159
RFI
#159
RFI
#159
RFI
#159
RFI
#159
RFI
12345678910
C
D
E
F
G
H
TODDLERS
AND
INFANTS
120
GREAT
READING
ROOM
101
YOUTH
STACKS
117
MECH.
113
MEN RR
110
WOMEN RR
111
STORAGE
108
BOOKMOBILE
ROOM
103
SORTING
123
I.T.
106
STAFF MEN
RESTROOM
105
STAFF-WOMEN
RESTROOM
104
ALL GENDER
RESTROOM
114
ALL GENDER
RESTROOM
115 JAN. RM
112
BOOKSTORE
109
+8'-0"
+8'-0"
NURSING/SENSORY
116
STORAGE
124
REPLACE (E) 1'X1' CLG TILES
WITH NEW TILES, GRIDS AND
LIGHTS.
YOUTH AREA:
NEW ACT TILE AND NEW
GRID SYSTEM
OFFICE
103A+8'-0"+8'-0"
MEETING/COMMUNITY
ROOM
102
VESTIBULE
107
+8'-7"
+9'-0"
VESTIBULE
100
+9'-4 1/2"
+8'-0"
+8'-0"
+8'-0"+8'-0"
DRAPES AND ROD 15'-8"W X 28' H
TRIM BETWEEN
CEILINGS @
DIFFERENT HEIGHTS
+8'-0"
+7'-7"
+8'-6"
+8'-0"
+7'-7"
#002
ASI
#002
ASI #002
ASI
ALIGN TILE PATTEN AT TWO
SURFACES
#002
ASI
+8'-9"
+10'-2"
#12
RFI
#38
RFI
3' - 0 3/4"22' - 0"
+7'-6"+7'-6"
+8'-0"
+8'-0"
+9'-0"
+8'-0"
#43
RFI
4 5/8"3' - 0 3/4"
2' - 3 3/8"
DEMO ABOVE 9'-0 A.F.F.
DEMO ABOVE 9'-0 A.F.F.
+9'-0"
DEMO ABOVE 9'-0 A.F.F.
+10'-0"
#60
RFI
#020
ASI
#020
ASI
#020
ASI
#020
ASI #020
ASI
#020
ASI
#020
ASI
#020
ASI
7
A9.4-1
11
A9.4-1
7
A9.4-1
14
A9.4-1SIM.
#020
ASI
#120
RFI
#109
RFI
#120
RFI
#120
RFI
4
A1.2-38
A1.2-3
+7'-6"+7'-6"
+9'-4 1/2"
+8'-0"
HIGH CEILING FOR COMPACT SHELVING.
CEILING HEIGHT TO BE VERIFIED WITH SELECTED SHELVING MANUFACTURER
#142
RFI
#142
RFI
#023
ASI
4"
11
'
-
8
"
1'
-
7
1
/
4
"
1' - 0 3/4"15' - 4"1' - 8"
10
A9.4-3
9
A9.4-1
7
A9.4-1
7
A9.4-1
#142.1
RFI
#142.1
RFI
V.
I
.
F
.
15
'
-
2
"
A1.0-2
3
ALIGN F.O.
BULKHEAD
#270#024
ASI
+9'-0"
#306
RFI
+8'-0"
#306
RFI
OPEN TO
STRUCTURE
#367
RFI
8
A9.4-2
13
A9.4-1
#368
RFI
#370
RFI 4' - 1 1/2"
16
A9.4-3
8
3
/
4
"
8
3
/
4
"
#251.2
RFI
#390
RFI #390
RFI
REFLECTED CEILING PLAN LEGEND
G-1:
GYPSUM BOARD CEILING PTD.
ACT-2:
2'X4' ACOUSTIC CEILING TILE
ACT-1:
1'X1' ACOUSTIC CEILING TILE
W-1:
CUSTOM WOOD GRILLE WITH ACOUSTIC
BACKING
OPEN TO STRUCTURE ABOVE
C -1:
CEMENT PLASTER
(E) CEILING TO REMAIN
#002
ASI
1.
2.
LIGHT FIXUTRE AND LIGHTING SCHEDUDLE REFER TO
ELECTRICAL DRAWING (E. SERIES) FOR GRAPHIC AND
DETAILS
NOT ACCEPTABLE TO RUN THE CONDUIT EXPOSED#002
ASI
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A6.0-2
REFLECTED
CEILING PLAN-
FIRST FLOOR
1/8" = 1'-0"1 RCP01-REFLECTED CEILING PLAN- FIRST FLOOR
#231
RFI
FE
C
FE
C
FEC
12345678910
C
D
E
F
G
H
STUDY
201
STUDY
202
STAFF
RESTROOM
2T3
ALL GENDER
RESTROOM
2T2
ALL GENDER
RESTROOM
2T1
STUDY
220
STAFF
MEETING
ROOM
221
HISTORY
222 ADULT
STACKS
200
VESTIBULE
SEATING
200A
YOUNG
ADULT
211
JAN.RM
217
STAIR 3
2S3
+8'-0"+8'-0"+8'-0"
STORAGE
200B MAKER
STORAGE
216
+9'-6"
OFFICE
226
OFFICE
223
DRAPES AND ROD
15'-8"W X 28' H
+9'-6"
YA STUDY
BOOTH
211A
+9'-6"
+7'-10"
STAFF
OFFICE
224
+9'-6"
+9'-6"
+9'-6"
+9'-6"
+8'-8"
SMOKE CONTAINMENT SYSTEM
OFFICE
225+9'-6"
+9'-6"
+9'-0"
ELEC. RM.
218
VIDEO
RECORDING
BOOTH
214
VIDEO
EDITING
BOOTH
213
+9'-6"
+9'-6"+9'-6"
CEILING
ABOVE F/F
LEVEL OF
HISTORY AND
OFFICE
+7'-8"
EXISTING SOFFIT HEIGHT ELEVATION,
TO CONFIRM IN FIELD
NEW SOFFIT TO MATCH AND ALIGN WITH
EXISTING SOFFIT HEIGHT ELEVATION, TO
CONFIRM IN FIELD
#30
RFI
1
A5.0-65
A5.0-6
+9'-6"
+7'-10"+7'-10"
#020
ASI
#020
ASI
#160
RFI
5'
-
5
3
/
4
"
+7'-10"
#204
RFI
+7'-8"
#204
RFI
#204
RFI #204
RFI
#204
RFI
#028
ASI
OPEN TO
STRUCTURE
#306
RFI
A.F.F.9' - 6"
13
A9.4-1
3
A5.0-6
17
A5.0-6 17
A5.0-6
20
A5.0-6
17
A5.0-6SIMSIM
#365
RFI
#365
RFI#365
RFI
#365
RFI#365
RFI
ALIGNALIGN
+7'-10"
+7'-10"
+8'-5"
REFLECTED CEILING PLAN LEGEND
G-1:
GYPSUM BOARD CEILING PTD.
ACT-2:
2'X4' ACOUSTIC CEILING TILE
ACT-1:
1'X1' ACOUSTIC CEILING TILE
W-1:
CUSTOM WOOD GRILLE WITH ACOUSTIC
BACKING
OPEN TO STRUCTURE ABOVE
C -1:
CEMENT PLASTER
(E) CEILING TO REMAIN
#002
ASI
1.
2.
LIGHT FIXUTRE AND LIGHTING SCHEDUDLE REFER TO
ELECTRICAL DRAWING (E. SERIES) FOR GRAPHIC AND
DETAILS
NOT ACCEPTABLE TO RUN THE CONDUIT EXPOSED#002
ASI
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A6.0-3
REFLECTED
CEILING PLAN-
SECOND FLOOR 1/8" = 1'-0"1 RCP02- REFLECTED CEILING PLAN- SECOND FLOOR
#12 HANGER WIRE
TEE GRID SYSTEM
ACOUSTICAL
CEILING PANELS
PERIMETER TRIM
4"H U.N.O.
T-BAR CONNECTOR CLIP
SEISMIC CLIP
"TEGULARIZE" CUT PANELS AT
PERIMETER
"T" BAR
SUSPENDED ACOUSTICAL
CEILING PANEL
HEMMED ANGLE MOUNDING
PARTITION AS SCHEDULED, SEE
PLAN FOR TYPE
WIRE HANGER
3/4" MIN.
8" MAX.
7/8"
NOTE:
USE SLIP CONNECTION AT TWO ADJACENT WALLS. AT
THE TWO OTHER, SECURE THE MAIN AND CROSS TEES
TO THE WALL ANGLE TO FORM A FIXED CONNECTION.
VERIFY WITH CEILING MANUFACTURER THE REQ'D
CLEAR DIMENSION BETWEEN CEILING TEE AND WALL.
(4) 12GA. SPLAY WIRES
(ATTACH TO MAIN RUNNER
ONLY)@ 45° FROM CLNG.
PLANE + 90° FROM EACH
OTHER PARALLEL TO CROSS
TEES AND MAIN RUNNERS.
SPACE @ 12' O.C. MAX BOTH
DIRECTIONS.
HEAVY DUTY MAIN RUNNER @ 4'-0" O.C.
LOCKING CROSS
TEES @ 2'-0" O.C. TYP.
MAX.
MAX.
2"
2"
TYP. 12GA. HANGER WIRE
ATTACHED TO STRUCTURE
ABV. COMPRESSION STRUT.
ANGLE CLIP-PINNED TO
CEILING STRUCTURE AND
BOLTED TO VERTICAL
COMPRESSION STRUT
TYP. 12 GA. HANGER WIRE @
4' O.C. + W/IN 8" OF PERIM.
WALL OR CLNG.
DISCONTINUITY. ADD. WIRES
W/IN 3" OF EA. CORNER OF
EA. FIXTURE + 2 ADD. WIRES
ATTACHED TO OPP.
CORNERS OF FIXTURES.
COMPRESSION STRUT SEE
STRUT CONNECTION DETAIL
3/A9.2-1 FOR ATTACHMENT TO
STRUCTURE ABOVE. LOCATE
ON MAIN RUNNER ON CENTER
OF 12x24 FIELD GRID, STARTING
AT MAX. OF 6'-0" FROM
PERIMETER.•
•
•
NOTES:
1. AREA OF CEILING PER EACH BRACE NOT TO
EXCEED 144 SQ. FT
2. FIRST BRACING POINT WITHIN 6 FT. OF EACH
WALL.
3. BRACE POINT ON MAIN RUNNER NOT TO EXCEED
2" DISTANCE FROM CROSS RUNNER.
4. COMPLY WITH CBC 2022 FOR CEILING SUPPORT.
5. AT LIGHT FIXTURES PROVIDE SAFETY CLIPS TO
TIE TO CLNG. LIGHT FIXTURE (ALL TYPES)
MECHANICALLY ATTACHED TO GRID (TWO PER
FIXTURE UNLESS INDEPENDENTLY SUPPORT),
REQUIRED FOR:
- PENDANT-HUNG FIXTURES DIRECTLY SUPPORTED
FROM STRUCTURE WITH 9 GA. WIRE
- RIGID LAY-IN OR CAN FIXTURES:
LESS THAN OR EQUAL TO 10LBS, ONE WIRE
TO STRUCTURE
11-56 LBS: TWO WIRES FROM HOSUING TO
STRUCTURE
EQUAL TO OR GREATER THAN 57 LBS:
SUPPORTED DIRECTLY TO STRUCTURE
TOP CLIP (MECHANICALLY FASTENED)
SPRING CLIP
VERTICAL HANGER WIRE
BULB CLIP (MECHANICALLY FASTENED)
"T" BAR CROSS TEE
"T" BAR MAIN RUNNER
TEGULAR ACOUSTIC PANEL
WIRE HANGER
NOTES:
1. SEE SCHEDULE FOR FINISH CEILING TYPE
2. USE MANUFACTURER RECOMMENDED SEISMIC PERIMETER
CONNECTION AT TWO ADJACENT WALLS. AT THE TWO REMAINING
WALLS, SECURE THE MAIN AND CROSS TEES TO THE WALL ANGLE TO
FORM A FIXED CONNECTION
ELEVATION
SCHEDULED SUSPENDED
CEILING SYSTEM
3/4" MIN8"
BRACING WIRES, 12
GAUGE MIN.
PLAN
8"6'-0" MAX 12'-0" O.C.
6'
-
0
"
M
A
X
12
'
-
0
"
O
.
C
.
90°90°
3/4" MIN. CLEAR
CROSS RUNNER OR
MAIN RUNNERRIGID VERTICAL STRUT @ 12'-0" O.C.
I.C.B.O. #2244, SEE DET. 2, 3/A9.4-1
NOTE:
TIE MAIN AND CROSS RUNNER TO TWO ADJACENT WALLS THAT WITH FIXIED
CONNECTIONS, 7/A9. 4-1. THE OTHER TWO ADJACENT WALLS SHALL BE A SLIPPED
CONNECTION, 1/A9.4-1
.
45
,
0
0
°
.
PERIMETER VERTICAL HANGER WIRES, TYP.
ATTACH
SCREW
THROUGH
EITHER TOP
FASTENER
OPENING
8 MAX.
PERIMETER
HANGER
WIRE
7/8"
SEISMIC
CLIP (USG
ACM7)
PERIMETER
CLOSURE
(MOLDING)
2
ALIGN
.25" MOUNTING HOLE
CAM LATCH
.625" RECESS
PLASTIC GROMMET
ADHESIVE MASTIC
DRYWALL BEAD
HINGE
PANEL WIDTH AS SPECIFIED
0'
-
2
1
/
2
"
ALIGN
EDGE MOULDING
HANGER WIRE, SEE A9.4-1 &
A9.4-2 FOR CONNECTION AND
MIN. SPACING REQUIREMENTS
SUSPENDED SOFFIT
ACT CEILING, SEE RCP
B.O. CLG.
SEE R.C.P.
SOFFIT
COLUMN W/
FIREPROOFING, S.S.D.
L TRIM 2-1/2 INCH DRML-300
#10 SMS, TYP.
2-1/2" C-CHANNEL
ACT CEILING, WHERE OCCURS,
SEE RCP
SLIP CONNECTION
HANGER WIRE, SEE A9.4-1 &
A9.4-2 FOR CONNECTION AND
MIN. SPACING REQUIREMENTS
1. SIM. REVEALS @ STRUCTURAL PENETRATION OF ACT CLG.
2. 4" ACT. TRIM IN LIEU OF 2 1/2 L TRIM @ ACT CLG.
B.O. CLG
SEE RCP
PER R.C.P.
2
1
/
2
"
#371
RFI
SOFFIT
COLUMN W/
FIREPROOFING, S.S.D.
L TRIM 2-1/2 INCH DRML-300
#10 SMS, TYP.
2-1/2" C-CHANNEL
ACT CEILING, WHERE OCCURS,
SEE RCP
SLIP CONNECTION
HANGER WIRE, SEE A9.4-1 &
A9.4-2 FOR CONNECTION AND
MIN. SPACING REQUIREMENTS
1. SIM. REVEALS @ STRUCTURAL PENETRATION OF ACT CLG.
2. 4" ACT. TRIM IN LIEU OF 2 1/2 L TRIM @ ACT CLG.
B.O. CLG
SEE RCP
PER R.C.P.
2
1
/
2
"
JOIST STUD AS NEEDED SEE
04/A9.4-3
SOFFIT FRAMING,
#10 SMS, TYP.
#371
RFI
#142.1
RFI
TRANSITION TRIM
HANGER WIRE
TO
STRUCTURE
CROSS TEE
\MAIN BEAM
ACOUSTICAL LAY-IN PANEL
HANGER WIRE
TO
STRUCTURE
MAIN BEAM
ACOUSTICAL LAY-IN PANEL
CROSS TEE
<=
8
"
(3) #10 SMS TYP.,
U.N.O.
CONT. STUD PER
NOTE 1 W (2) #
10 SMS @ EA.
STUD
NOTES:
1. USE MIN. 4" X 33 MIL STUDS (400S137-33) FOR SDS <1.45
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A9.4-1
INTERIOR DETAILS-
CEILINGS
6" = 1'-0"1 ICL- SUSPENDED CLG- SLIP CONNECTION @ PERIMETER
3" = 1'-0"2 ICL- SUSPENDED CLG
3" = 1'-0"3 ICL- SUSPENDED CLG COMPRESSION STRUT
6" = 1'-0"4 ICL- SUSPENDED CLG AT GRID
3" = 1'-0"5 ICL- SUSPENDED CLG PLAN AND ELEVATION
6" = 1'-0"7 ICL- SUSPENDED CLG AT FIXED PERIMETER
3" = 1'-0"8 ICL- ACCESS PANEL AT GYP. BD. CLG
3" = 1'-0"11 ICL - TYP. ACT @ GYP. SOFFIT
1 1/2" = 1'-0"12 ICL - COLUMN @ GYP. SOFFIT CROSS SECTION
1 1/2" = 1'-0"14 ICL - COLUMN @ GYP. SOFFIT CROSS SECTION LONG SPAN
#020
ASI
#60
RFI
3" = 1'-0"9 ICL - ACOUSTIC CEILING FLOATING EDGE
3" = 1'-0"6 ICL- ACT TRANSITION AT DIFFERENT HEIGHTS TRIM EDGE
#159.1
RFI
3" = 1'-0"13 ICL - GYP CEILING EDGE INTERFACE WITH ANOTHER CEILING TYPE
#367
RFI
//
/
CEILING JOIST PER
OPENING FRAMING
400T150-54
JOIST STUD, TYP.(2) #10 SMS ATTACH WEB OF
CLIPPED 400T150-54 TO WEB OF
JOIST STUD, TYP. EA. END
CLIP FLANGE OF
400T150 & BEND BACK
TO FORM "L" CLIP
TYPICAL CONNECTION
A
A
04 A9.4-3
2' - 1" MAX.
4'
-
1
"
M
A
X
.
CEILING JOIST PER
400T150-54 EA SIDE
04 A9.4-3
SECTION Fy(ksi)
33
4psfLateral Support of Compression Flange
UnsupportedJoist spacing (in) o.c.
12 16 24 12 16 24
7'10"7'3"6'6"7'1"6'6"5'9"7'4"6'8"5'10"162PDS125-18 70
12 16 24 12 16 24
6psfLateral Support of Compression Flange
Mid-SpanJoist spacing (in) o.c.UnsupportedJoist spacing (in) o.c.Mid-SpanJoist spacing (in) o.c.
250PDS125-18 70
362PDS125-18 70
400PDS125-18 70
600PDS125-18 70
33
33
33
33
8'4"7'7"6'8"
9'0"8'5"7'7"8'2"7'7"6'9"10'3"9'4"11'9"10'8"9'4"8'2"
9'11"9'2"8'3"8'11"8'3"7'5"12'6"11'6"14'1"12'11"11'6"10'2"
10'2"9'5"8'6"9'2"8'6"7'8"12'11"11'10"14'6"13'4"11'10"10'6"
11'10"10'11"9'10"10'7"9'10"8'10"15'0"13'10"16'10"15'6"13'10"12'3"
9'4"8'7"7'8"8'3"7'8"6'10"8'7"7'10"9'10"9'0"7'10"6'10"
10'4"9'7"8'6"9'3"8'6"7'8"11'11"10'10"13'8"12'5"10'10"9'6"
11'3"10'5"9'4"10'1"9'4"8'5"14'7"13'6"16'2"15'0"13'6"12'0"
11'7"10'9"9'8"10'5"9'8"8'8"15'0"13'11"16'8"15'6"13'11"12'5"
13'1"12'2"10'11"11'9"10'11"9'10"17'0"15'8"18'11"17'6"15'8"14'1"
162PDS125-18
250PDS125-18
362PDS125-18
400PDS125-18
600PDS125-18
1. FOR UNBRACED SECTIONS, ALLOW MOMENT IS BASED ON 2012 AISI SPECIFICATIONS SECTION C3.1.2 WITH WEAK AXIS AND
TORSIONAL UNBRACED LENGTH ASSUME TO BE THE LISTED SPAN (COMPLETELY UNBRACED). FOR MID-SPAN BRACED SECTIONS,
ALLOWABLE MOMENT BASED ON 2012 AISI SPECIFICATIONS SECTION C3.1.2 WITH WEAK AXIS AND TORSIONAL UNBRACES LENGTH
ASSUMED TO BE ONE HALF OF THE LISTED SPAN (BRACING AT MID-SPAN)
2. WEB CRIPPLING CALCULATION BASED ON BEARING LENGTH = 1 INCH
3. WEB CRIPPLING AND SHEAR CAPACITY HAVE NOT BEEN REDUCED FOR PUNCHOUTS. IF WEB PUNCHOUTS OCCUR NEAR SUPPORT
MEMBERS MUST BE CHECKED FOR REDUCED SHEAR AND WEB CRIPPLING IN ACCORDANCE WITH THE 2012 AISI SPECIFICATIONS
4. VALUES ARE SIMPLE SPAN CONDITIONS
(1) LAYER OF 1/2" OR
5/8" GYPSUM BOARD,
PERPENDICULAR TO
JOIST STUD FRAMING
400S125-32 @ 24"O.C., PER SCHED SEE 3 / A9.2-8
STRAP BLOCKING AT MID SPAN PER 4/ A.2-8
1.
2.
NOTES:
ATTACH GYP BOARD TO FRAMING WTIH ASTM
C1002 TYPE S SCREWS WITH CORROSION
RESISTANT TREATMENT AT 12" O.C. MAX.
WHEN GYPSUM BOARD IS TO BE APPLIED TO
BOTH CEILING AND WALLS, GYPSUM BOARD
SHALL BE APPLIED FIRST TO THE CEILING AND
THEN TO THE WALLS IN ACCORDANCE WITH
ASTM C840.
TYP.
5
A9.2-8
12'-0" MAX.
#10 @ EA. JOIST STUD &
(4) #10 PER BLOCK, TYP.
362S162-54, TYP.
(2) #10 @ FLANGE T&B
EA. END, TYP.
TRACK BLOCKING TO
MATCH JOISTS. PLACE
@ 72" O.C. MAX. & @ EA.
END OF STUD, TYP.
FRAMED CEILNG
SEE PLAN FOR
SIZE AND SPACING
(1) LAYER GYP, MAX.
A SECTION AT TYP. STUD
#10 SMS @ TOP &
BOT FLANGES, TYP.
400T150-54
JOIST STUD, SEE 3/A9.2-8
(1) LAYER OF GYP. MAX.
(2) LAYERS GYP. MAX.
METAL STUD 18GA (43
MIL) MIN (RDP SHALL
DESIGN THE WALL)
(3) #10 SMS TO EA.
STUD WHERE TRACK
IS FASTENED THRU
GYP. (2) #10 SMS
WHERE TACK IS
FASTENED DIRECTLY
TO VERT. STUD, TYP.
D GYP BOARD ATTACHMENT
JOIST STUD
WALL TRACKASTM C1002 TYPE S
SCREWS AT 12" O.C.
#10 SMS @ TOP &
BOT FLANGES, TYP.
400T150-54
JOIST STUD, SEE 3/A9.2-8
(1) LAYER OF GYP. MAX.
(2) LAYERS GYP. MAX.
METAL STUD 18GA (43
MIL) MIN (RDP SHALL
DESIGN THE WALL)
(3) #10 SMS TO EA.
STUD WHERE TRACK
IS FASTENED THRU
GYP. (2) #10 SMS
WHERE TACK IS
FASTENED DIRECTLY
TO VERT. STUD, TYP.
B SECTION AT JAMB
C SECTION AT OPENING
1/16" MAX.
(3) #10 SMS TO EA.
STUD WHERE TRACK
IS FASTENED THRU
GYP. (2) #10 SMS
WHERE TACK IS
FASTENED DIRECTLY
TO VERT. STUD, TYP.
HEADER
(2) LAYERS GYP. MAX.
(1) LAYER OF GYP., MAX.
JOIST STUD, SEE 3/A9.2-8
400T150-54
#10 SMS @ TOP & BOT
FLANGES, TYP.
METAL STUD 18 GA (43 MIL) MIN
SOFFIT FRAMING,
L TRIM 2-1/2 INCH DRML-300
#10 SMS, TYP.
COLUMN W/
FIREPROOFING, S.S.D.
1. 4" ACT. TRIM IN LIEU OF 2 1/2 L TRIM @ ACT CLG.
B.O. CLG
SEE RCP
(1) LAYER OF 5/8" TYPE X
GYPSUM BOARD,
PERPENDICULAR TO JOIST
STUD FRAMING
CH-STUD 2-1/2" X 1-1/2" 20 GA.
J-RUNNER 2-1/2" WIDE WITH 1" LEG AND
2" LEG 24 GA. STEEL
1.
2.
3.
NOTES:
ATTACH GYP BOARD TO FRAMING WITH ASTM
C1002 TYPE S SCREWS WITH CORROSION
RESISTANT TREATMENT AT 24" O.C. MAX.
WHEN GYPSUM BOARD IS TO BE APPLIED TO BOTH
CEILING AND WALLS, GYPSUM BOARD SHALL BE
APPLIED FIRST TO THE CEILING AND THEN TO THE
WALLS IN ACCORDANCE WITH ASTM C840.
1-HR RATED HORIZONTAL SHAFT WALL PER UL NO.
K-501 OR UL. U415 SYSTEM A 1HR FIRE TEST
2' - 0"
1" GYP. BD 24" WIDE
STUD DEPTH DEFLECTION
L/120 16'-10"13'-8"250CT-21
2-1/2" 21 mils (25 GA)
11'-10"8'-6"
5 PSF 7.5 PSF 10 PSF 15 PSF
250CT-33
2-1/2" 33 mils (20 GA)
L/240 11'-10"9'-10"8'-8"7'-3"
ALLOWABLE CEILING CH/CT STUD SPAN
16'-10"14'-4"11'-1"
12'-11"11'-1"9'-11"8'-7"
L/360
L/120
L/240
L/360
9'-10"8'-3"7'-3 6'-2"
12'-11"
11'-1"9'-6"8'-7"7'-5"
0.157"Ø HILTI 'X-U' PDF
W/ 1 1/4" EMBED @ 16"
OC & 2" FROM ENDS
#10 SMS @ TOP &
BOT FLANGES, TYP.
400T150-54
4" MIN.4" MIN.
(E) FLOOR SLAB
ALIGN
EDGE MOULDING
ACT CEILING, SEE RCP
B.O. CLG.
SEE R.C.P.
EDGE MOULDING
ACT CEILING, SEE RCP
B.O. CLG.
SEE R.C.P.
>8
"
4" METAL STUD
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A9.4-3
INTERIOR DETAILS
- CEILINGS
1 1/2" = 1'-0"02 ICL - JOISTED GYP BOARD CLG @ACCESS PANELS
1 1/2" = 1'-0"04 ICL - ALLOWABLE CEILING STUD SPAN
1 1/2" = 1'-0"01 ICL - JOIST GYP-BOARD CEILING SECTION
1 1/2" = 1'-0"09 ICL - GYP BD CEILING JOIST - FINISH ONE SIDE ONLY
3" = 1'-0"10 ICL - JOISTED GYP BD CEILING CONNECTIONS
#020
ASI
1 1/2" = 1'-0"13 ICL - COLUMN @ GYP BD CLG
1 1/2" = 1'-0"15 ICL - 1 HOUR FIRE RATED JOIST GYP-BOARD CEILING SECTION
#178.2
RFI
#325
RFI
3" = 1'-0"16 ICL- ACT TRANSITION AT DIFFERENT HEIGHTS STUD EDGE
#375
RFI
#375
RFI
3/4" MIN. PLYWD. ADJUSTABLE SHELF,
SEE SPECS FOR FINISH MAT., TYP. ON METAL
SHELF BRACKETS & STDS.
SEE ROOM FINISH SCHEDULE
FOR BASE, TYP.
3/4" PLYWOOD CABINET DOOR, SEE
SPECS FOR FINISH MAT., TYP.,
CONCEALED SELF-CLOSING HINGES,
TUMBLER LOCK, TYP.
SEE SCHED. FOR PARTITION TYPE
AND WALL FINISH, TYP.
PROVIDE 6" MTL. STUD FRAMING
FOR CABINET MOUNTING SUPPORT
@ TOP AND BASE OF CABINET, TYP.
3/4" COUNTERTOP; WITH 4" BACKSPLASH
(3 SIDES), SEE SPECS U.O.N.
3/4" CONT. COUNTERTOP SUPPORT
3"
WIRE PULLS TYP.
2' - 0"
4"
TYP. U.O.N.
1' - 11"U.
O
.
N
.
2'
-
1
0
"
1
1
/
2
"
1/
4
"
U.
O
.
N
.
4"
FINISH FLOOR
SEE ROOM FINISH SCHEDULE
FOR BASE, TYP.
METAL GUIDE AND TRACK W/
DUST SHELF, TYP.
SEE SCHED. FOR PARTITION TYPE
AND WALL FINISH, TYP.
PROVIDE 6" MTL. STUD FRAMING
FOR CABINET MOUNTING
SUPPORT @ TOP AND BASE
OF CABINET, TYP.
3/4" COUNTERTOP; WITH 4" BACKSPLASH (3
SIDES), SEE SPECS U.O.N.
3/4" CONT. COUNTERTOP
SUPPORT
3"
3/4" PLYWOOD DRAWER FACE WIRE,
SEE SPECS FOR FINISH MAT., TYP.
WIRE PULLS AND TUMBLER LOCK TYP.
2' - 0"
4"
TYP. U.O.N.
1' - 11"
1
1
/
2
"
1/
4
"
7
3
/
4
"
EQ
.
EQ
.
U.
O
.
N
.
4"
2'
-
1
0
"
FINISH FLOOR
SEE ROOM FINISH SCHEDULE FOR
BASE, TYP.
SEE SCHED. FOR WALL FINISH,TYP.
PROVIDE 6" MTL. STUD FRAMING FOR
CABINET MOUNTING SUPPORT @ TOP
AND BASE OF CABINET, TYP.
3/4" COUNTERTOP WITH 4"
BACKSPLASH (3 SIDES), SEE SPECS
U.O.N.
3/4" CONT. COUNTERTOP SUPPORT
METAL GUIDE, TRACK, AND
DUST SHELF, TYP.
3/4" DRAWER FACE, SEE SPECS
FOR FINISH MAT., TYP., WIRE
PULLS AND TUMBLER LOCK TYP.
2' - 0"
4"
TYP. U.O.N.
1' - 11"
3"
U.
O
.
N
.
2'
-
1
0
"
U.
O
.
N
.
4"
1
1
/
2
"
1/
4
"
5"
EQ
.
EQ
.
EQ
.
FINISH FLOOR
CABINET BEYOND. SEE ROOM
FINISH SCHEDULE FOR BASE,
TYP. WRAP BASE INSIDE
CABINET, TYP.
SEE SCHED. FOR PARTITION
TYPE AND WALL FINISH, TYP.
EXPOSED EXTERIOR
FINISH CONDITION,
TYP.
3/4" QUARTZ COUNTERTOP WITH 4"H
BACKSPLASH (3 SIDES), SEE SPECS U.O.N.
3/4" CONT. COUNTERTOP
SUPPORT
PROVIDE CLEAR KNEE
AND TOE SPACE
3/4" FIXED PANEL, SEE SPECS FOR FINISH
MAT., TYP. FULL WIDTH OF CABINET
PROVIDE 6" MTL. 16 GA. STUD BLOCKING
FOR CABINET MOUNTING SUPPORT,
@ TOP & BASE OF CABINET, TYP.
3"
TOE CLR.
6" MAX.
KNEE CLR.
11" MIN.
KNEE CLR.
8" MIN.
6
1
/
2
"
4"
U.
O
.
N
.
4"
2'
-
3
"
K
N
E
E
C
L
R
.
MA
X
.
2'
-
1
0
"
1
1
/
2
"
1/
4
"
2' - 0"
FINISH FLOOR
ALL T.O. FAUCET CONTROLS TO BE LESS
THAN 44" MAX. A.F.F.
CLEARANCE REDUCTION
19" MIN. TOE CLR
MI
N
.
C
L
R
.
9"
3/4" MIN. PLYWD. ADJUSTABLE SHELF,
SEE SPECS FOR FINISH MAT., TYP. ON
METAL SHELF
BRACKETS & STDS.
SEE ROOM FINISH SCHEDULE
FOR BASE, TYP.
3/4" CABINET DOOR, SEE SPECS FOR
FINISH MAT., TYP., CONCEALED SELF-
CLOSING HINGES, TUMBLER LOCK, TYP.
SEE SCHED. FOR PARTITION TYPE
AND WALL FINISH, TYP.
PROVIDE 6" MTL. STUD FRAMING FOR
CABINET MOUNTING SUPPORT @
TOP AND BASE OF CABINET, TYP.
3/4" COUNTERTOP WITH 4"
BACKSPLASH (3 SIDES), SEE SPECS U.O.N.
WIRE PULLS TYP.
3/4" CONT. COUNTERTOP SUPPORT
3"
2' - 0"
4"
TYP. U.O.N.
1' - 11"
1
1
/
2
"
1/
4
"
8"
U.
O
.
N
.
4"
U.
O
.
N
.
2'
-
1
0
"
FINISH FLOOR
SEE SCHED. FOR PARTITION TYPE
AND WALL FINISH, TYP.
PROVIDE 6" MTL. STUD FRAMING
FOR CABINET MOUNTING SUPPORT
@ TOP AND BASE OF CABINET, TYP.
3/4" COUNTERTOP; WITH 4"
BACKSPLASH (3 SIDES), SEE
SPECS U.O.N.
3/4" CONT. COUNTERTOP SUPPORT
24" MAX SPAN BETWEEN CABINETS
2' - 0"
4"
U.
O
.
N
.
2'
-
1
0
"
FINISH FLOOR
WIRE PULLS, TYP.
4"X8" METAL AIR VENT
IN CABINET FACE,
(MOCKETT MESH/1 OR
EQUIVALENT)
CABINET DOOR,
SEE DETAIL 1
BASE, SEE FINISH
SCHEDULE
WIDTH VARIES. SEE ELEV.WIDTH VARIES. SEE ELEV.
HE
I
G
H
T
V
A
R
I
E
S
.
S
E
E
E
L
E
V
.
CA
B
I
N
E
T
D
O
O
R
4"
FINISH FLOOR
3/4" MIN. PLYWD. ADJUSTABLE SHELF,
SEE SPECS FOR FINISH MAT., TYP. ON
METAL SHELF
BRACKETS & STDS.
SEE ROOM FINISH SCHEDULE
FOR BASE, TYP.
SEE SCHED. FOR PARTITION TYPE
AND WALL FINISH, TYP.
PROVIDE 6" MTL. STUD FRAMING
FOR CABINET MOUNTING SUPPORT
@ TOP AND BASE OF CABINET, TYP.
3/4" COUNTERTOP; WITH 4"
BACKSPLASH (3 SIDES); SEE SPECS,
U.O.N.
3/4" CONT. COUNTERTOP SUPPORT
3"
2' - 0"
4"
TYP. U.O.N.
1' - 11"
1
1
/
2
"
1/
4
"
2'
-
1
0
"
FINISH FLOOR 4
1
/
4
"
SEE SCHED. FOR PARTITION
TYPE AND WALL FINISH, TYP.
EXPOSED EXTERIOR
FINISH CONDITION, TYP.
3/4" QUARTZ COUNTERTOP WITH 4"H
BACKSPLASH (3 SIDES), SEE SPECS U.O.N.
3/4" CONT. PLYWOOD
COUNTERTOP SUPPORT
PROVIDE CLEAR KNEE
AND TOE SPACE
3/4" FIXED PANEL, PLAM FINISH
COUNTERBALANCE CCH-CBCB-18BL OR
SIMILAR, 18" x 2" THICK CONCEALED IN-
WALL COUNTER SUPPORT BRACKET,
@ EA. STUD, PTD. BLACK, EDGES
GROUND AND DEBURRED
TOE CLR.
6" MAX.
KNEE CLR.
11" MIN.
KNEE CLR.
8" MIN.
6
1
/
2
"
4"
U.
O
.
N
.
4"
2'
-
3
"
K
N
E
E
C
L
R
.
MA
X
.
2'
-
1
0
"
1
1
/
2
"
1/
4
"
2' - 0"
FINISH FLOOR
ALL T.O. FAUCET CONTROLS TO BE LESS
THAN 44" MAX. A.F.F.
CLEARANCE REDUCTION
19" MIN. TOE CLR
MI
N
.
C
L
R
.
9"
3/4" REMOVABLE PANEL, PLAM FINISH
7/8"
PROVIDE SS FLATHEAD HEX
FASTENER W/ T-NUT @ FRAME
SEE ROOM SCHEDULE
FOR BASE TYPE
WOOD FRAMING SPACED 4' O.C.
SEE SCHEDULE FOR PARTITION
TYPE AND WALL FINISH, TYP.
MIN. (3) ADJUSTABLE 3/4" MIN.
PLYWD. SHELVES W/ P.LAM. FINISH
ON METAL SHELF BRACKETS
PROVIDE BLOCKING FOR
INSTALLATION AS NECESSARY,
TYP.
PROVIDE 6" MTL. 16 GA. STUD
BLOCKING FOR CABINET
MOUNTING SUPPORT,
@ TOP & BASE OF CABINET, TYP.
T.O. DOOR FRAME
UNDER CABINET TASK LIGHTING
S.E.D., TYP.
GYP BD. SOFFIT, SEE
3'
-
5
1
/
4
"
4'-8"
1'
-
1
"
2
1
/
2
"
3'
-
7
3
/
4
"
1'
-
1
1
/
4
"
1'
-
1
"
SEE SCHEDULE FOR PARTITION
TYPE AND WALL
FINISH, TYP.
3/4" PLYWOOD CABINET DOOR W/ P. LAM.
FINISH,SELF CLOSING CONCEALED
HINGES, CATCH AND CABINET LOCK, TYP.
PROVIDE 6" MTL. 16 GA. STUD
FRAMING FOR CABINET MOUNTING
SUPPORT, @ TOP & BASE OF CABINET, TYP
WIRE PULLS, TYP. U.O.N.
3/4" MIN. PLYWD. ADJUSTABLE SHELF,
P.LAM. FINISH ON METAL SHELF
BRACKETS & STDS.
PROVIDE BLOCKING FOR
INSTALLATION AS NECESSARY. TYP.
AL
I
G
N
GYP BD. SOFFIT, SEE
TYP. U.O.N
1' - 1"
SE
E
E
L
E
V
A
T
I
O
N
S
2'
-
6
"
T.O. DOOR FRAME
SEE SCHEDULE FOR PARTITION
TYPE AND WALL
FINISH, TYP.
3/4" PLYWOOD CABINET DOOR W/ P. LAM.
FINISH,SELF CLOSING CONCEALED
HINGES, CATCH AND CABINET LOCK, TYP.
PROVIDE 6" MTL. 16 GA. STUD
FRAMING FOR CABINET MOUNTING
SUPPORT, @ TOP & BASE OF CABINET, TYP
WIRE PULLS, TYP. U.O.N.
3/4" MIN. PLYWD. ADJUSTABLE SHELF,
P.LAM. FINISH ON METAL SHELF
BRACKETS & STDS.
PROVIDE BLOCKING FOR
INSTALLATION AS NECESSARY. TYP.
TYP. U.O.N
1' - 1"
T.O. DOOR FRAME
A9.4-1
7
#405
RFI
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
A9.6-2
INTERIOR DETAILS
- CASEWORK
1 1/2" = 1'-0"1 ICS - BASE CABINET W/ SHELVES2
1 1/2" = 1'-0"2 ICS - BASE CABINET W/ 3 DRAWERS2
1 1/2" = 1'-0"3 ICS - BASE CABINET W/ 4 DRAWERS1
1 1/2" = 1'-0"4 ICS - BASE CABINET W/ SINK2
1 1/2" = 1'-0"6 ICS - BASE CABINET W/ 1 DRAWER2
1 1/2" = 1'-0"7 ICS - UNDER COUNTER FRIDGE LOCATION
1 1/2" = 1'-0"8 ICS - CASEWORK VENT
1 1/2" = 1'-0"5 ICS - BASE CABINET W/ ONE SHELF NO DOOR2
1 1/2" = 1'-0"9 ICS - SINK APRON W/ FRAMING
1 1/2" = 1'-0"10 ICS - UPPER CABINET W/ OPEN SHELVES
1 1/2" = 1'-0"11 ICS - UPPER CABINET W/ ONE SHELF
1 1/2" = 1'-0"12 ICS - UPPER CABINET WITH SHELF
LIMIT OF WORKCIVIC CENTER DRIVE
RO
S
S
S
T
R
E
E
T
LIMIT OF WORK
LIMIT OF WORK
LIMIT OF WORKSANTA ANA LIBRARYPARKING STRUCTURELIMIT OF WORK
KID'S AREA
N.A.P.
EXISTING TO REMAIN
EV
CAPABLE
PARKING
STALL
EV
CAPABLE
PARKING
STALL
EV
CAPABLE
PARKING
STALL
EV
CAPABLE
PARKING
STALL
TR TR
1. TYPE:WAYFIDING SIGNAGE
2. LETTERS:SEE NOTES
3. BRAILLE:NOT REQUIRED
4. MATERIAL:N/A
5. FINISH:N/A
6. COLOR:N/A
7. MOUNT: WALL MOUNTED W/ EPOXY AND BLIND ANCHOR STUDS
ALUMINUM SIGN
PAINTED (DARK GRAY
C7)
2 3/4"
2% SLOPE
CONCRETE FOOTING AS
REQUIRED BY ENGINEER
1/4" THICK WHITE
OPAQUE
ACRYLIC LENS. FLUSH TO
SIGN CABINET.
VANDAL RESISTANT
FASTENER
2% SLOPE2% SLOPE
EQ
EQ
EQ
2% SLOPE
DETACHABLE PANEL
(DARK GRAY C7)
2% SLOPE 2% SLOPE
8 1/4"
11"
LIGHT GRAY
PAINTED, SMOOTH
FINISH CONCRETE
BASE
#97
RFI
#97
RFI
#97
RFI #97
RFI
STRUC ANCHORS
ROUTE CUT LETTERFORMS
WITH OPAQUE WHITE
ACRYLIC LENS
SWIS721 BT, BOLD
1/2" THICK ALUMINUM SIGN
PAINTED (DARK GRAY C7)
BAHNSCHRIFT CONDENSED
ACM SIGN CABINET
PAINTED (DARK GRAY C7)
LIGHT GRAY
PAINTED, SMOOTH
FINISH CONCRETE
BASE
SANTA ANA
26 CIVIC CENTER DRIVE
PUBLIC LIBRARY CONCEALED
MECHANICAL FASTENER
BEHIND SIGN.
3/4" FRISKET
PAINTED LINE
2'
-
6
"
7' - 6"
6"
6"
6"
2'
-
0
"
MI
N
.
1'
-
5
"
4"
3' - 6"3' - 6"
#307
RFI
#307
RFI
#307
RFI#307
RFI
V.I.F.
7' - 6"1' - 6 3/4"
8
1
/
4
"
1'
-
6
1
/
2
"
11
"
CHECK-OUT
LETTERS:1/4" THICK ALUMINUM LETTERFORMS, HELVETICA BOLD,
SEE 3/G.01
MATERIAL:BRUSHED ALUMINUM
MOUNT: MOUNTED ON FUNITURE W/ EPOXY3
1
/
2
"
EQ EQ
EQ
EQ
V.I.F.
3' - 0"
V.
I
.
F
.
2'
-
0
"
C7
ALUMINUM LETTERFORMS
1/4" THICK ACRYLIC
CURVED TO MATCH DESK.
ASK US TYPE:WAYFIDING SIGNAGE
LETTERS:1/4" THICK ALUMINUM LETTERFORMS, HELVETICA BOLD,
SEE 3/G.01
MATERIAL:BRUSHED ALUMINUM
MOUNT: MOUNTED ON FUNITURE W/ EPOXY
1' - 8"
3
1
/
2
"
EQ EQ
EQ
EQ
V.I.F.
3' - 0"
V.
I
.
F
.
2'
-
0
"
C7
ALUMINUM LETTERFORMS
1/4" THICK ACRYLIC
CURVED TO MATCH DESK.
REFER TO 6&8/C5.0-2 FOR POST AND FOOTING DETAILS
80
"
M
I
N
.
T
O
B
.
O
.
S
I
G
N
A
B
O
V
E
G
R
A
D
E
ST
09-30-2027
O
ARCHITECT
FOFCALE
REN.
AT ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
F R A N CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D E N VA
,N I N G
CRAE
TCEIT
S C
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
G1.2-7
WAYFINDING
SIGNAGE
1 1/2" = 1'-0"1 WO1 - SOUTH ENTRANCE MONUMENT SIGNAGE
1" = 12'-0"2 SOUTH ENTRANCE MONUMENT SIGNAGE
FRONT VIEW
SECTION WEST ELEVATION
PLAN VIEW (SITE)
1 1/2" = 1'-0"3 WA6 - CASEWORK WAYFINDING - CHECK-OUT
1 1/2" = 1'-0"4 WA6 - CASEWORK WAYFINDING - ASK US
5 WA6 - DESK NORTH ENTRANCE
1 1/2" = 1'-0"6 BOOKMOBILE NO PARKING SIGN
#009.3
ASI
#343
RFI
#343
RFI
#343
RFI
#343
RFI
#374
RFI #374
RFI
STRUCTURAL NOTES
DESIGN CRITERIA
1. ALL WORK SHALL CONFORM TO THE MINIMUM STANDARDS OF THE FOLLOWING
CODES:
2022 CALIFORNIA BUILDING CODE AND LATEST REVISIONS
REFERRED TO HERE AS "THE CODE", AND ANY OTHER REGULATING AGENCIES WHICH
HAVE AUTHORITY OVER ANY PORTION OF THE WORK, INCLUDING THE STATE OF
CALIFORNIA DIVISION OF INDUSTRIAL SAFETY, AND THOSE CODES & STANDARDS
LISTED IN THESE NOTES AND SPECIFICATIONS.
2. DESIGN LOADS:
ASSUMED LIVE LOADS FOR BUILDING:
TYPICAL FLOORS, INCLUDES PARTITION 150 PSF REDUCIBLE
FLOOR PARTITION LOAD 15 PSF REDUCIBLE
TYPICAL ROOF 20 PSF REDUCIBLE
LIVE LOADS:
CATWALK 40 PSF REDUCIBLE
TRELLIS 20 PSF REDUCIBLE
3. WIND ANALYSIS PER CHAPTER 16 OF THE CODE
RISK CATEGORY = II
BASIC WIND SPEED = 95 mph
WIND EXPOSURE = C
4. SEISMIC ANALYSIS PER CHAPTER 16 OF THE CODE UTILIZING THE FOLLOWING
PROCEDURE:
RISK CATEGORY = II
IMPORTANCE FACTOR = 1.0
REDUNDANCY FACTOR, ρ = 1.0
SS = 1.296
S1 = 0.462
SITE CLASS = D
SDS = 1.074
SEISMIC DESIGN CATEGORY=
R = 2 1/2 (STEEL SPECIAL CANTILEVER COLUMN SYSTEMS)
TRELLIS STRUCTURES
Ω0 = 1 1/4 (STEEL SPECIAL CANTILEVER COLUMN SYSTEMS)
TRELLIS STRUCTURES
Cd = 2 1/2 (STEEL SPECIAL CANTILEVER COLUMN SYSTEMS)
TRELLIS STRUCTURES
GROUND MOTION USED:
- SITE SPECIFIC DESIGN RESPONSE SPECTRUM (SEE GEOTECHNICAL REPORT).
GENERAL
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING
CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES OR
INCONSISTENCIES.
2. ALL DRAWINGS ARE CONSIDERED TO BE A PART OF THE CONTRACT DOCUMENTS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL
DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY
DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT PRIOR TO START OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE
ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR
ANY CODE REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR
OWN EXPENSE AND AT NO EXPENSE TO THE OWNER OR ARCHITECT.
3. NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL
NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL
BE AS SHOWN FOR SIMILAR WORK.
4. SEE ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:
SIZE AND LOCATION OF ALL DOOR AND WINDOW OPENINGS, EXCEPT AS NOTED.
SIZE AND LOCATION OF ALL INTERIOR AND EXTERIOR NON-BEARING PARTITIONS.
SIZE AND LOCATION OF ALL CONCRETE CURBS, EQUIPMENT PADS, PITS, FLOOR
DRAINS, SLOPES, DEPRESSED AREAS, CHANGE IN LEVEL, CHAMFERS, GROOVES,
INSERTS, ETC.
SIZE AND LOCATION OF ALL FLOOR AND ROOF OPENINGS EXCEPT AS SHOWN.
FLOOR AND ROOF FINISHES.
DIMENSIONS NOT SHOWN ON STRUCTURAL DRAWINGS.
5. SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR THE FOLLOWING:
PIPE RUNS, SLEEVES, HANGERS, TRENCHES, WALL AND SLAB OPENINGS, ETC.,
EXCEPT AS SHOWN OR NOTED. ELECTRICAL CONDUIT RUNS, BOXES, OUTLETS IN
WALLS AND SLABS.
CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL OR PLUMBING FIXTURES.
SIZE AND LOCATION OF MACHINE OR EQUIPMENT BASES, ANCHOR BOLTS FOR MOTOR
MOUNTS.
6. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE
FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE
CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE
STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE
LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT,
ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT
INCLUDE INSPECTION OF THE ABOVE ITEMS.
7. OPENINGS, POCKETS, ETC., LARGER THAN 6" SHALL NOT BE PLACED IN CONCRETE
SLABS, DECKS, WALLS, UNLESS SPECIALLY DETAILED ON THE STRUCTURAL
DRAWINGS. NOTIFY THE STRUCTURAL ENGINEER WHEN DRAWINGS BY OTHERS SHOW
OPENINGS, POCKETS, ETC., LARGER THAN 6" NOT SHOWN ON THE STRUCTURAL
DRAWINGS, BUT WHICH ARE LOCATED IN STRUCTURAL MEMBERS. FOR ANY FURTHER
RESTRICTIONS ON OPENINGS IN STRUCTURAL ELEMENTS, SEE APPLICABLE SECTIONS
BELOW.
8. ASTM SPECIFICATIONS ON THE DRAWINGS SHALL BE OF THE LATEST REVISION.
9. CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK
OPERATIONS FOR FILLED EXCAVATIONS OR BURIED STRUCTURES, SUCH AS
CESSPOOLS, CISTERNS, FOUNDATIONS, ETC. IF ANY SUCH STRUCTURES ARE FOUND,
STRUCTURAL ENGINEER SHALL BE NOTIFIED IMMEDIATELY.
10. CONSTRUCTION MATERIAL SHALL BE SPREAD OUT IF PLACED ON FRAMED ROOF OR
FLOOR. LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT.
PROVIDE ADEQUATE SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT
ATTAINED DESIGN STRENGTH.
11. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE DRAWINGS, IF
ANY, ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL
EXISTING UNDERGROUND UTILITIES AND COORDINATING WITH THE REQUIREMENTS
OF THIS PROJECT. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN
EXCAVATING AND TRENCHING ON THE SITE. THE CONTRACTOR SHALL IMMEDIATELY
NOTIFY THE ARCHITECT IF ANY CONDITIONS ARE DISCOVERED THAT REQUIRES
FURTHER COORDINATION.
THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT OCCURS DUE TO NOT
FULLY LOCATING EXISTING UTILITIES.
12. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS
BASED ON AVAILABLE KNOWLEDGE OF EXISTING STRUCTURE. CONTRACTOR SHALL
VERIFY IN FIELD ALL EXISTING CONDITIONS RELATIVE TO THE SCOPE OF THIS
PROJECT. WHERE ACTUAL CONDITIONS ARE NOT IN ACCORDANCE WITH THE
DRAWINGS PROVIDED, THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY.
CONTRACTOR SHALL ALIGN FOR SUFFICIENT BUDGET AND SCHEDULE CONTINGENCY
TO ADDRESS EXISTING HIDDEN CONDITIONS.
13. ALL DEMOLITION SHALL BE PERFORMED IN SUCH A WAY AS NOT TO DAMAGE THE
EXISTING STRUCTURAL ELEMENTS THAT ARE TO REMAIN IN THE FINISHED
STRUCTURE. ANY PORTIONS OF STRUCTURE TO REMAIN THAT ARE DAMAGED DURING
DEMOLITION SHALL BE REPLACED AT NO ADDITIONAL COST. EXISTING STRUCTURAL
ELEMENTS SHALL BE PROTECTED TO THE FULLEST EXTENT POSSIBLE, IN ORDER TO
MITIGATE DAMAGE. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT
OF ALL EXISTING STRUCTURAL ELEMENTS THAT ARE NECESSARY FOR THE
COMPLETION OF ALL NEW WORK.
FOUNDATION
1. FOUNDATION DESIGN BASED ON SOIL REPORT BY NINYO & MOORE, REPORT NO.
212092001, DATED APRIL 14, 2023.
2. FOOTINGS ARE DESIGNED BASED ON THE FOLLOWING INFORMATION:
W = FOOTING WIDTH
D = FOOTING DEPTH BELOW ADJACENT GRADE
ALLOWABLE BEARING *
WALL & ISOLATED FTGS = 2,000 + 500, 3000 PSF (MAX)
SOIL PRESSURE
RESTRAINED WALLS = 56 PCF (EFP)
PASSIVE EARTH PRESSURE **
PASSIVE EARTH PRESSURE = 350 PCF (EFP) , 3,500 PSF (MAX)
COEFFICIENT OF FRICTION = 0.35
FOOTINGS SHALL BEAR ON FIRM NATURAL SOILS. MINIMUM DEPTH OF FOOTINGS
BELOW LOWEST ADJACENT FINAL GRADE SHALL BE 24". MINIMUM WIDTH OF FOOTING
SHALL BE 24".
FOR PIER FOUNDATIONS:
SIDE FRICTION = 120 PSF
UPWARD = 80 PSF
LATERAL = 300 PSF, 3,000 PSF (MAX)
FOR DRILLED PIERS:
ALL DRILLED PILE EXCAVATION SHOULD BE INSPECTED BY THE SOILS ENGINEER AND
THE INSPECTOR TO VERIFY THE DEPTH OF THE FILL AND THAT THE DESIRED
PENETRATION INTO NATURAL SOILS IS ACHIEVED.
PRECAUTIONS SHOULD BE TAKEN DURING THE INSTALLATION OF PILES TO MINIMIZE
THE POSSIBILITY OF CAVING. CLOSELY SPACED PILES SHOULD BE DRILLED AND FILLED
ALTERNATELY, ALLOWING THE CONCRETE TO SET AT LEAST EIGHT HOURS BEFORE
DRILLING AN ADJACENT HOLE. PILE EXCAVATIONS SHOULD BE FILLED WITH CONCRETE
AS SOON AFTER DRILLING AND INSPECTION AS POSSIBLE; THE HOLES SHOULD NOT BE
LEFT OPEN OVERNIGHT.
DIFFICULTIES DUE TO WATER MAY BE REDUCED IF THE PILES ARE POURED
IMMEDIATELY AFTER INSPECTION. ANY WATER SHOULD BE PUMPED FROM THE
EXCAVATIONS AND THE CONCRETE PLACED IN THE DRY.
REINFORCING STEEL (FOR CONCRETE AND MASONRY)
1. REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF CHAPTER 19 & 21 OF
THE CODE, ASTM A615, GRADE 60 UNO.
2. BARS SHALL BE CLEAN OF RUST, GREASE, OR OTHER MATERIALS LIKELY TO IMPAIR
BOND. ALL REINFORCING BAR BENDS SHALL BE MADE COLD.
3. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. WWF SHALL BE SUPPORTED
ON APPROVED CHAIRS.
4. REINFORCING BAR SPLICES SHALL BE MADE AS INDICATED ON THE DRAWINGS. LAP
ALL HORIZONTAL BARS AT CORNERS AND INTERSECTIONS. STAGGER ALL SPLICES
UNLESS NOTED OTHERWISE ON PLANS.
5. ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN THE
FINAL IN-PLACE INSPECTION IS MADE.
6. WHERE WELDING OF REINFORCING IS APPROVED BY THE STRUCTURAL ENGINEER, IT
SHALL BE DONE BY AWS CERTIFIED WELDERS USING FILLER MATERIAL TO MATCH
MATERIAL STRENGTHS. WELDING PROCEDURES SHALL CONFORM TO THE
REQUIREMENTS OF STRUCTURAL WELDING CODE- REINFORCING STEEL", AWS-D1.4,
LATEST REVISION. REINFORCING BARS TO BE WELDED SHALL CONFORM TO THE
REQUIREMENTS OF ASTM A706.
7. BARS IN SLABS SHALL BE SECURELY SUPPORTED ON WELL-CURED CONCRETE
BLOCKS OR APPROVED METAL CHAIRS, PRIOR TO PLACING CONCRETE.
8. REINFORCING STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE "A.C.I. MANUAL
OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES",
LATEST EDITION.
9. COMPLETE AND DETAILED REINFORCING PLACEMENT DRAWINGS SHALL BE
PREPARED AND SUBMITTED TO THE ARCHITECT FOR APPROVAL BY THE STRUCTURAL
ENGINEER PRIOR TO FABRICATION IN ACCORDANCE WITH THE SPECIFICATIONS AND
APPLICABLE CODES. THESE DRAWINGS SHALL BE AVAILABLE ON THE JOB SITE PRIOR
TO PLACING OF CONCRETE.
10. MILL TEST REPORTS FOR GRADE 60 BARS SHALL BE SUBMITTED PRIOR TO
PLACEMENT OF CONCRETE.
11. PROVIDE INSPECTION OF CONCRETE PER SPECIAL INSPECTION NOTES SECTION.
INSPECTION SHALL BE SCHEDULED SO THAT PLACEMENT OF REINFORCING STEEL,
CONDUIT, SLEEVES, AND EMBEDDED ITEMS MAY BE CORRECTED PRIOR TO
PLACEMENT OF OVERLYING GRIDS OR REINFORCING STEEL.
12. ALL GRADE 60 REINFORCING STEEL SHALL BE CLEARLY MARKED TO DIFFERENTIATE
THEM FROM GRADE 40 REINFORCING STEEL IF CONCURRENTLY ON SITE.
13. CONCRETE PROTECTION FOR REINFORCEMENT:
No. 6 THROUGH
No. 18 BARS 2
1-1/2
NOT EXPOSED
TO WEATHER
OR IN CONTACT
WITH GROUND
SLABS, JOISTS
AND WALLS
BEAMS,
COLUMNS,
PEDESTALS,
AND
TENSION TIES
PRIMARY
REINFORCEMENT,
STIRRUPS, TIES,
SPIRALS, AND
HOOPS
ALL No. 5 BAR, W31 OR
D31 WIRE, AND
SMALLER
1-1/2No. 14 AND No. 18
BARS
3/4No. 11 BAR AND
SMALLER
CONCRETE
EXPOSURE MEMBER REINFORCEMENT
CAST-IN-PLACE NONPRESTRESSED CONCRETE MEMBERS
MIN COVER,
IN.
CAST AGAINST AND
PERMANENTLY IN
CONTACT WITH
GROUND
ALL ALL 3
EXPOSED TO
WEATHER OR IN
CONTACT WITH
GROUND
1-1/2
CONCRETE
1. ALL CONCRETE CONSTRUCTION SHALL CONFORM WITH CHAPTER 19 OF THE CODE
AND WITH THE PROVISIONS OF ACI 318, LATEST EDITION.
2. REINFORCED CONCRETE IS DESIGNED BY THE "ULTIMATE STRENGTH DESIGN
METHOD".
3. CONCRETE MIXES SHALL BE DESIGNED BY THE APPROVED TESTING LABORATORY
AND APPROVED BY THE STRUCTURAL ENGINEER. THE COMPRESSIVE STRENGTH OF
THE CONCRETE SHALL BE PROPORTIONED BASED ON CHAPTER 19 OF THE CODE.
4. SCHEDULE OF STRUCTURAL CONCRETE 28-DAY STRENGTH AND TYPES:
5. AGGREGATE FOR HARDROCK CONCRETE SHALL CONFORM TO ALL REQUIREMENTS
AND TESTS OF ASTM C33 AND PROJECT SPECIFICATIONS. EXCEPTIONS MAY BE USED
ONLY WITH PERMISSION OF THE STRUCTURAL ENGINEER.
6. CONCRETE MIXING OPERATION, ETC. SHALL CONFORM TO ASTM C94.
7. PLACEMENT OF CONCRETE SHALL CONFORM TO THE CODE AND PROJECT
SPECIFICATIONS. CLEAN AND ROUGHEN TO 1/4" AMPLITUDE ALL CONCRETE
SURFACES AGAINST WHICH NEW CONCRETE IS TO BE PLACED.
8. ALL REINFORCING BARS, ANCHOR BOLTS AND OTHER CONCRETE INSERTS SHALL BE
WELL SECURED IN POSITION PRIOR TO PLACING CONCRETE.
9. PROVIDE SLEEVES FOR PLUMBING AND ELECTRICAL OPENINGS IN CONCRETE BEFORE
PLACING. DO NOT CUT ANY REINFORCING WHICH MAY CONFLICT. CORING IN
CONCRETE IS NOT PERMITTED. NOTIFY THE STRUCTURAL ENGINEER IN ADVANCE OF
CONDITIONS NOT SHOWN ON THE DRAWINGS. SEE THESE DRAWINGS FOR
ADDITIONAL RESTRICTIONS ON THE PLACEMENT OF OPENINGS IN SLABS AND WALLS.
10. PIPES LARGER THAN 1-1/2" DIAMETER SHALL NOT BE EMBEDDED IN STRUCTURAL
CONCRETE EXCEPT WHERE SPECIFICALLY APPROVED BY STRUCTURAL ENGINEER.
PIPES SHALL NOT DISPLACE OR INTERRUPT REINFORCING BARS, SPACE EMBEDDED
PIPES AND SLEEVES AT A MINIMUM OF 3 DIAMETERS ON CENTER.
EXPOSURE
CLASSESLOCATION
F S W C
MIN
STRENGTH
f'c (PSI)
MAX WATER/
CEMENT
RATIO
CEMENT
TYPE
(ASTM C150)
DENSITY
ALL CONCRETE
FOOTINGS, TIE
BEAMS, PILES, PILE
CAPS
F0 S0 W0 C1 4000 PSI 0.50 II/V 150 PCF
SLAB ON GRADE F0 S0 W0 C1 4000 PSI 0.45 II/V 150 PCF
ALL CONCRETE WALLS,
FLOOR FRAMING AND
ELEVATED SLABS
F0 S0 W0 C1 4000 PSI 0.45 II/V 150 PCF
EQUIP PADS F0 S0 W0 C1 3000 PSI 0.50 II 150 PCF
STRUCTURAL STEEL
1. STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED BY AN
APPROVED AND LICENSED FABRICATOR IN ACCORDANCE WITH THE AISC
SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS (LATEST EDITION), AND WITH
CHAPTERS 17 AND 22 OF THE CODE.
2. ALL STRUCTURAL STEEL SHALL CONFORM TO THE ASTM DESIGNATION AS INDICATED
BELOW (UNO):
WF & WT SHAPES A992
ANGLES, CHANNELS, PLATES, BARS,
CONNECTION PLATES, AND MISC A36
HSS SECTIONS A500, GRADE C
BOLTS F3125, GRADE A325
TWIST-OFF TYPE BOLTS F3125, GRADE F1852
BOLTS IN CONCRETE F1554 GR 36 OR
F1554 GR 55 S1(WELDABLE)
3. THE STRUCTURAL STEEL FABRICATOR SHALL FURNISH SHOP DRAWINGS OF ALL
STEEL TO THE ARCHITECT FOR ARCHITECT'S AND STRUCTURAL ENGINEER'S REVIEW
AND APPROVAL BEFORE FABRICATION.
4. BOLT HOLES USED IN STEEL SHALL BE 1/16" LARGER IN DIAMETER THAN NOMINAL
SIZE OF BOLT USED, EXCEPT AS NOTED.
5. ALL STRUCTURAL STEEL SURFACES THAT ARE ENCASED IN CONCRETE, MASONRY
OR SPRAY ON FIREPROOFING, OR ARE ENCASED BY BUILDING FINISH, SHALL BE LEFT
UNPAINTED.
6. ALL WELDING IS TO BE DONE BY CERTIFIED WELDERS USING FILLER METALS TO
MATCH MATERIAL STRENGTH (UNO). ALL WELDS SHALL BE IN CONFORMITY WITH THE
PROJECT SPECIFICATIONS AND THE CODE FOR WELDING IN BUILDING
CONSTRUCTION (AWS D1.1 LATEST REVISION) OF THE AMERICAN WELDING SOCIETY.
SEE SPECIAL INSPECTIONS SECTION FOR WELDING INSPECTION REQUIREMENTS.
USE OF E70T-4 WIRE IS NOT PERMITTED.
7. WHERE FABRICATION OF STRUCTURAL, LOAD-BEARING OR LATERAL LOAD-RESISTING
MEMBERS OR ASSEMBLIES IS BEING CONDUCTED ON THE PREMISES OF
FABRICATOR'S SHOP, SPECIAL INSPECTION OF THE FABRICATED ITEMS SHALL BE
PERFORMED DURING FABRICATION, EXCEPT WHERE THE FABRICATOR HAS BEEN
APPROVED TO PERFORM WORK WITHOUT SPECIAL INSPECTIONS IN ACCORDANCE
WITH SECTION 1704.2.5.1 OF THE CODE.
8. WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED.
WHERE FILLET WELD SYMBOL IS GIVEN WITHOUT INDICATION OF SIZE, USE MINIMUM
SIZE WELDS AS SPECIFIED IN AISC 360-16 SECTION J2.2b.
9. ALL EXPOSED STRUCTURAL STEEL AND MISCELLANEOUS METAL SHALL BE HOT DIP
GALVANIZED AFTER FABRICATION UNO.
10. THE SPECIAL INSPECTIONS FOR STEEL ELEMENTS OF BUILDINGS AND STRUCTURES
SHALL BE AS REQUIRED BY SECTION 1705.2 OF THE CODE AND CONSTRUCTION
DOCUMENTS.
11. COORDINATE STRUCTURAL STEEL REQUIRED FOR ELEVATOR INSTALLATION AND
OPERATION IN ADDITION TO WHAT IS SHOWN ON DRAWINGS WITH ELEVATOR
MANUFACTURER.
ADHESIVE ANCHORING SYSTEMS
1. ADHESIVES USED FOR SETTING DOWELS AND ANCHORS SHALL BE IN CONFORMANCE
WITH ASTM C-881, TYPE IV. ACCEPTABLE MANUFACTURERS FOR ADHESIVES ARE AS
FOLLOWS:
CONCRETE:
SIMPSON SET-XP (ICC ESR-2508)
HILTI HIT-RE 500-SD (ICC ESR-2322)
HILTI HIT-HY 200 (ICC ESR-3187)
2. ANCHORS OR DOWELS EMBEDDED IN ADHESIVES SHALL BE INSTALLED PER THE
MANUFACTURER'S INSTRUCTIONS.
3. HOLES RECEIVING ADHESIVE ANCHORS SHALL BE CLEAN AND FREE OF DUST PRIOR
TO APPLYING ADHESIVE.
4. HOLES DRILLED INTO REINFORCED CONCRETE OR MASONRY SHALL NOT DAMAGE OR
CUT EXISTING REINFORCING STEEL. HOLES DRILLED INTO PRE-STRESSED OR POST-
TENSIONED CONCRETE SHALL HAVE A CLEARANCE OF ONE INCH MINIMUM FROM
TENDONS. LOCATE EXISTING REINFORCING STEEL AND/OR TENDONS USING NON-
DESTRUCTIVE METHODS PRIOR TO DRILLING.
5. ALL ANCHORS INSTALLED WITH ADHESIVES SHALL HAVE CONTINUOUS SPECIAL
INSPECTION IN ACCORDANCE WITH THE EVALUATION REPORT (ICC-ER) AND CODE
SECTIONS 1705.3 AND 1705.4.
6. ADHESIVE ANCHORS SHALL NOT BE INSTALLED IN THE UNDERSIDE OF FLOORS OR
ROOFS.
EXPANSION ANCHORS
1. ANCHOR DIAMETER REFERS TO THE ANCHOR SIZE AND NOT THE DIAMETER OF THE
DRILLED HOLE.
2. ALL ANCHORS SHOULD MEET THE MINIMUM EMBEDMENT, EDGE DISTANCE, SPACING
AND SLAB THICKNESS CRITERIA ESTABLISHED BY THE RELEVANT ICC-ES EVALUATION
REPORT.
3. ACCEPTABLE MANUFACTURERS FOR EXPANSION ANCHORS ARE AS FOLLOWS:
CONCRETE:
HILTI KWIK BOLT TZ2 (KB-TZ2) (ICC ESR-4266)
SIMPSON STRONG-BOLT 2 (ICC ESR-3037)
4. DO NOT LOCATE EXPANSION ANCHORS CLOSER TO EDGE OF CONCRETE/MASONRY
OR TO CONTROL/CONSTRUCTION JOINTS THAN THE MINIMUM EDGE DISTANCE
SPECIFIED IN THE ICC REPORT, UNO.
5. WHEN INSTALLING DRILLED-IN ANCHORS IN EXISTING NON-PRESTRESSED
REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING
THE EXISTING REINFORCING BARS.
6. IT IS NOT ACCEPTABLE TO SUBSTITUTE ANY CAST-IN-PLACE BOLTS/RODS/ ANCHORS
FOR EXPANSION ANCHORS WITHOUT PRIOR APPROVAL FROM THE STRUCTURAL
ENGINEER OF RECORD.
7. USE HOT DIP GALVANIZED OR STAINLESS STEEL ANCHORS WHEN EXPANSION
ANCHORS ARE EXPOSED TO WEATHER OR IN A DAMP ENVIRONMENT.
8. SPECIAL INSPECTION SHALL BE PROVIDED PER THE ICC-ER REPORT NOTED ABOVE.
HILTI KB-TZ2 IN CONCRETE
SYMBOL UNITS
NOMINAL ANCHOR DIAMETER (IN)
1/4 3/8 1/2 5/8 3/4
NOMINAL BIT DIAMETER do in 1/4 3/8 1/2 5/8 3/4
EFFECTIVE MIN.
EMBEDMENT
hef in 1 1/2 1 1/2 2 2 1/2 1 1/2 2 2 1/2 3 1/4 2 3/4 3 1/4 4 3 1/4 3 3/4 4 3/4
NOMINAL EMBEDMENT hnom in 1 3/4 1 7/8 2 1/2 3 2 2 1/2 3 3 3/4 3 1/4 3 3/4 4 1/2 4 4 1/2 5 1/2
MINIMUM HOLE DEPTH ho in 2 2 2 3/4 3 1/4 2 1/4 2 3/4 3 1/4 4 1/4 3 3/4 4 1/4 4 3/4 4 1/4 4 3/4 5 3/4
FIXTURE HOLE DIAMETER dh in 5/16 7/16 9/16 11/16 13/16
MINIMUM CONCRETE
THICKNESS hmin in 3 1/4 3 1/4 4 5 3 1/2 4 5 5 1/2 5 5 1/2 6 5 1/2 6 8
HILTI KB-TZ2 - CARBON STEEL
SYMBOL UNITS
NOMINAL ANCHOR DIAMETER (IN)
1/4 3/8 1/2 5/8 3/4
EFFECTIVE MIN.
EMBEDMENT hef in 1 1/2 1 1/2 2 2 1/2 1 1/2 2 2 1/2 3 1/4 2 3/4 3 1/4 4 3 1/4 3 3/4 4 3/4
INSTALLATION TORQUE Tinst ft-lb 4 30 50 40 110
MINIMUM EDGE
DISTANCE1 cmin in 1 1/2 5 2 1/2 2 1/2 8 2 3/4 2 3/4 2 1/4 4 1/2 3 1/2 2 3/4 5 4 3 1/2
MINIMUM SPACING1 smin in 1 1/2 5 2 1/4 2 12 3 1/2 3 2 4 1/2 2 3/4 2 1/4 4 1/2 3 3/4 3 3/4
1 REFER TO ESR-4266, TABLE 3 FOR SPACING REQUIREMENTS FOR cmin AND EDGE DISTANCE REQUIREMENTS FOR smin.
HILTI KB-TZ2 - STAINLESS STEEL
SYMBOL UNITS
NOMINAL ANCHOR DIAMETER (IN)
1/4 3/8 1/2 5/8 3/4
EFFECTIVE MIN.
EMBEDMENT hef in 1 1/2 1 1/2 2 2 1/2 1 1/2 2 2 1/2 3 1/4 2 3/4 3 1/4 4 3 1/4 3 3/4 4 3/4
INSTALLATION TORQUE Tinst ft-lb 6 30 40 60 125
MINIMUM EDGE
DISTANCE1 cmin in 1 1/2 5 2 1/2 2 1/2 N/A 2 3/4 2 1/2 2 1/4 4 3 1/4 2 1/4 5 4 3 3/4
MINIMUM SPACING1 smin in 1 1/2 5 2 1/4 2 1/4 N/A 2 3/4 2 1/2 2 5 1/2 2 3/4 3 5 4 4
1 REFER TO ESR-4266, TABLE 3 FOR SPACING REQUIREMENTS FOR cmin AND EDGE DISTANCE REQUIREMENTS FOR smin.
HILTI KB-TZ2 - CARBON STEEL INTO TOP OF CONCRETE FILLED STEEL DECK1,2
SYMBOL UNITS
NOMINAL ANCHOR DIAMETER (IN)
1/4 3/8 1/2
EFFECTIVE MIN.
EMBEDMENT hef in 1 1/2 1 1/2 2 2
NOMINAL EMBEDMENT hnom in 1 3/4 1 7/8 2 1/2 2 1/2
MINIMUM HOLE DEPTH ho in 2 2 2 1/2 2 3/4
MINIMUM CONCRETE THICKNESS
OVER UPPER DECK FLUTE hmin,deck in 2 1/2 2 1/2 2 1/2 3 1/4
MINIMUM EDGE
DISTANCE cmin in 3 16 7 1/2
MINIMUM SPACING smin in 3 8 9
1 APPLICABLE FOR hmin,deck LESS THAN 4". FOR hmin,deck ≥", SEE INFORMATION IN TABLE ABOVE.
2 REFER TO ESR-4266, FIGURE 5D FOR INSTALLATION REQUIREMENTS INTO CONCRETE FILLED STEEL DECK.
HILTI KB-TZ2 - CARBON STEEL INTO SOFFIT OF CONCRETE FILLED STEEL W DECK1
SYMBOL UNITS
NOMINAL ANCHOR DIAMETER (IN)
1/4 3/8 1/2 5/8 3/4
EFFECTIVE MIN. EMBEDMENT hef in 1 1/2 1 1/2 2 2 1/2 1 1/2 2 2 1/2 3 1/4 2 3/4 4 3 1/4 3 3/4
MINIMUM HOLE DEPTH ho in 2 2 2 3/4 4 3/4
MINIMUM CONCRETE THICKNESS
OVER UPPER DECK FLUTE hmin,deck in 2 1/2
2 1/4
2 1/2
3 1/4
2 1/2 2 1/2 2 1/2 3 1/4
1 REFER TO ESR-4266, FIGURES 5A & 5B.
2 3/4 3 1/4 4 1/4 3 3/4 4 1/4 4 3/4
HILTI KB-TZ2 - CARBON STEEL INTO SOFFIT OF CONCRETE FILLED STEEL B DECK1
SYMBOL UNITS
NOMINAL ANCHOR DIAMETER (IN)
1/4 3/8 1/2 5/8
EFFECTIVE MIN. EMBEDMENT hef in 1 1/2 1 1/2 2 1 1/2 2 3 1/4 2 3/4
MINIMUM HOLE DEPTH ho in 2 2 2 3/4
MINIMUM CONCRETE THICKNESS
OVER UPPER DECK FLUTE hmin,deck in 2 1/4
2 1/4
2 1/4
4 1/4
2 1/4 3 1/4
1 REFER TO ESR-4266, FIGURE 5C.
2 3/4 3 3/4
3 1/4
STRUCTURAL OBSERVATION & SITE VISITS
KPFF WILL PROVIDE STRUCTURAL OBSERVATION SERVICES AS DEFINED IN THE CODE.
SITE VISIT REPORTS WILL BE SUBMITTED IN WRITING TO THE OWNER'S REPRESENTATIVE,
SPECIAL INSPECTOR AND THE BUILDING OFFICIAL. PERIODIC STRUCTURAL
OBSERVATIONS WILL BE MADE AT SIGNIFICANT CONSTRUCTION STAGES AS DEFINED
BELOW. THE STRUCTURAL OBSERVATION WILL CONSIST OF A VISUAL OBSERVATION OF
THE STRUCTURAL SYSTEM FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND
SPECIFICATIONS. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE
RESPONSIBILITY FOR THE INSPECTIONS REQUIRED BY THE CODE. THE CONTRACTOR
SHALL PROVIDE KPFF WITH A CONSTRUCTION SCHEDULE AND (5) WORKING DAYS NOTICE
SO THAT THE OBSERVATION VISITS CAN BE PLANNED IN ADVANCED.
SITE VISITS
1. CONTRACTOR SHALL NOTIFY STRUCTURAL ENGINEER FIVE (5) WORKING DAYS PRIOR
TO THE FOLLOWING CONSTRUCTION MILESTONES:
SPREAD/CONTINUOUS FOOTING FOUNDATIONS:
AFTER PLACEMENT OF REINFORCING STEEL, BASE PLATE ANCHORS, SILL PLATE
ANCHORS AND HOLDOWN ANCHORS PRIOR TO PLACING OF CONCRETE.
CONCRETE WALLS:
AFTER PLACEMENT OF REINFORCING STEEL, PRIOR TO PLACING OF CONCRETE.
STEEL FRAMING:
DURING PLACEMENT OF STEEL MEMBERS.
PLYWOOD ROOF DIAPHRAGM FRAMING:
AFTER PLACEMENT OF NAILING AND/OR SCREWS, TENSION TIES AND STRAPS PRIOR
TO PLACING OF ROOFING MATERIAL.
2. FAILURE TO NOTIFY ARCHITECT/ENGINEER OF ANY CONSTRUCTION MILESTONES MAY
RESULT IN CONTRACTOR HAVING TO REMOVE WORK FOR THE PURPOSE OF REVIEW
AT THE CONTRACTOR'S EXPENSE.
N
I
R
No. S3866
Exp. 3/31/26
G
T
R
E
TATSS
E OFILACFO
UCTURA
R
L
R
STERED P L
OFESSIONA
N
E
R
AI
E
ENGI
WILLI
H.THORP
................
.
.
.
...............................
.
.
.
...............
E
AM
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
BID SET
FINAL PERMIT/CONFORM SET
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
2/
1
1
/
2
0
2
6
1
1
:
5
1
:
3
0
A
M
Au
t
o
d
e
s
k
D
o
c
s
:
/
/
S
a
n
t
a
A
n
a
L
i
b
r
a
r
y
/
2
2
5
7
5
-
0
1
S
a
n
t
a
A
n
a
L
i
b
r
a
r
y
_
S
t
r
u
c
t
_
S
R
2
2
.
r
v
t
S0.0-1
GENERAL NOTES
JO
B
N
U
M
B
E
R
:
2
1
0
0
5
8
8
;
J
O
B
N
A
M
E
:
S
a
n
t
a
A
n
a
L
i
b
r
a
r
y
R
e
no
v
a
t
i
o
n
;
S
H
E
E
T
:
S
0
.
0
-1;
P
D
:
M
J
S
;
P
M
:
E
S
SHEET INDEX
S0.0-1 GENERAL NOTES
S0.0-2 GENERAL NOTES
S0.0-3 ABBREVIATIONS AND SYMBOLS
S2.4-1 FOUNDATION PLAN
S2.4-2 FIRST FLOOR FRAMING PLAN
S2.4-3 SECOND FLOOR FRAMING PLAN
S2.4-4 ROOF FRAMING PLAN
S2.5-1 TRASH ENCLOSURE PLANS AND DETAILS
S2.5-2 EXTERIOR PORTAL PLANS
S3.0-1 SECTIONS AND ELEVATIONS
S3.0-2 SECTIONS AND ELEVATIONS
S4.0-1 TYPICAL CONCRETE DETAILS
S4.0-2 TYPICAL CONCRETE DETAILS
S4.0-3 NOT USED
S4.0-4 CONCRETE DETAILS
S5.0-1 TYPICAL STEEL DETAILS
S5.0-2 STEEL DETAILS
S5.0-3 STEEL DETAILS
S5.0-4 STEEL DETAILS
S5.0-5 STEEL DETAILS
S6.0-1 TYPICAL METAL STUD DETAILS
S6.0-2 TYPICAL METAL STUD DETAILS
S6.0-3 TYPICAL METAL STUD DETAILS
S6.0-4 TYPICAL METAL STUD DETAILS
S7.0-1 EQUIPMENT ANCHORAGE DETAILS
S7.0-2 EQUIPMENT ANCHORAGE DETAILS
S7.0-3 EQUIPMENT ANCHORAGE DETAILS
#29
ASI#019
REV # DESCRIPTION DATE
#29 RFI 12.16.2024
ASI#019 ASI 03.21.2025
#365 RFI 02.04.2026
#365
ISSUE DATE
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
STANDARD BOLTED CONNECTION SCHEDULE
(2) 7/8"Ø 1/4"
(2) 7/8"Ø
(3) 7/8"Ø
(3) 7/8"Ø
(4) 7/8"Ø
W21
W18
W16
W14
3/8"
3/8"
3/8"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
1/4"
WELD
SIZE
PLATE
THICKNESS
NO. & SIZE
OF BOLTS
REQUIRED
BEAM
SIZE
(5) 7/8"Ø
(4) 7/8"Ø
W12 / C12
W10 / C10
W8 / C8
1. ALL BOLTS TO BE ASTM A325-N IN A SNUG-TIGHTENED
JOINT, UNO.
2. CONNECTION PLATES TO HAVE AISC STANDARD ROUND
OR HORIZONTAL SHORT-SLOTTED HOLES, UNO.
3. ALL CONNECTION PLATE MATERIAL TO BE A36, UNO.
4. SHOWN ON PLANS INDICATES NUMBER OF BOLTS
REQUIRED. IF NOT SHOWN THEN USE THE NUMBER
OF BOLTS SHOWN IN THE TABLE ABOVE.
#
CL BEAM
1/2"
2 1/2"
1 1/2"FOR SHEAR PLATE AND
BOLTS SEE SCHEDULE
COPE BEAM FLANGE AS
REQUIRED
SEE
SCHEDULE
A BEAM TO BEAM
TY
P
3"
TY
P
3"
TY
P
1
1
/
2
"
(E) CONCRETE SLAB
Wx BM PER PLAN
(2) 5/8"Ø HILTI 'KB-TZ2'
W/ 4" EMBED @ 12" OC
BENT PL1/2 x 3" WIDE AT
EACH ANCHOR
1/4
3-SIDES
NOTES:
1. USE NON-DESTRUCTIVE TESTING
TO LOCATE (E) REINF. DO NOT
CUT OR DAMAGE (E) REINF.
2. FIREPROOFING PER ARCH (TYP).
3. SEE DETAIL FOR
CONDITIION AT 2ND FLOOR.
GROUT AS REQUIRED
FOR FULL BEARING
3/S5.0-2
TY
P
2"
6"
M
I
N
8"
M
A
X
TY
P
2
1
/
2
"
FOR SHEAR PL &
BOLTS SEE
PL3/4 W/ (4) 3/4" Ø BOLTS
W/ 6" EMBED W/ HILTI
'HIT-HY 200'
SEE SCHED
ON
(E) CONC
ELEVATED
SLAB
(E) CONC
BM
MAX
1/2"
4"
Wx BM PER PLAN
1/S5.0-1
NOTE:
USE NON-DESTRUCTIVE TESTING
TO LOCATE (E) REINF. DO NOT
CUT OR DAMAGE (E) REINF.
1
S5.0-1
(E) CONCRETE SLAB
Wx BM PER PLAN
(2) 5/8"Ø HILTI 'KB-TZ2' W/ 4"
EMBED @ 12" OC AT EDGE
CONDIDTION (@ 6" OC AT SIM)
BENT PL1/2 x 6" WIDE
AT EACH ANCHOR
1/4
3 SIDES
NOTES:
1. USE NON-DESTRUCTIVE TESTING
TO LOCATE (E) REINF. DO NOT CUT
OR DAMAGE (E) REINF.
2. SEE DETAIL FOR
CONDITIION AT 2ND FLOOR.
8"
NEW OPENING (E) ELEVATED
CONC SLAB
10" MIN
8" MAX
4/S5.0-2
(E) CONC FILL
OVER MTL DECK
L6x4x5/16x1'-6" LG (LLV)
W/ (2) 1/2"Ø HILTI 'KB-TZ2'
W/ 3 1/4" EMBED INTO (2)
LOW FLUTES MIN EA
SIDE HSS
GA
P
1"
HSS PER PLAN
5/8"Ø BOLT CENTERED
IN 2 1/2" VERT
SLOTTED HOLE
WASHER EA SIDE
NOTE:
REFER TO DETAIL FOR ALTERNATE
HSS TOP CONNECTION AT (E) Wx BEAM.
1/S5.0-5
MIN
7"
4"
3"
14"
10"
TYP
2" 12"
CONNECTION
PER
Wx PER PLAN
(E) CONC SLAB
(E) CONC BEAM
PL3/4 W/ (4) 3/4"Ø BOLTS W/ 6"
EMBED W/ HILTI 'HIT- HY 200'
NOTE:
USE NON-DESTRUCTIVE TESTING
TO LOCATE (E) REINF. DO NOT
CUT OR DAMAGE (E) REINF. PLATE
MAY NEED TO BE RESIZED TO
MISS (E) REINF
2" HORIZ SLOT
HOLES
1/2" PL x 3" SQ
WASHER
3/16
TYP
1
S5.0-1
COL PER PLAN
1/4
1/4
BOLTS
PER
BEAM PER PLAN
WT5x9.5
PLAN
CL
1
S5.0-1
1
2 MAX
L7x4x3/8 (LLV)
EA SIDE OF COL
HSS ELEVATOR
GUIDE RAIL
SUPPORT
3/4"Ø THRU BOLT
W/ WASHERS BOTH
SIDES AND DOUBLE
NUT (HAND TIGHT
1ST NUT)
CENTERED IN A
13/16"x 3 1/2" LG
VERT SLOTTED
HOLE
L3x3x1/4 AT COL
1/2"Ø HILTI 'KB-TZ2'
W/ 3 1/4" EFF
EMBED AT LOW
FLUTE
(E) CONC FILL
OVER STEEL DECK
PER PLAN
PL1/4x4x0'-6"
1/4 2 MIN
1/4 2 MIN
3/16
3/16
1/4
1/4
2" CLR
A
A BASE PLATE
EQ EQ
TYP
1 1/2"
TYP
1 1/2"
BASE PL3/8 W/ (2) 1/2"Ø HILTI
'KB-TZ2' W/ 2" EFF EMBED
1/4
(2) L8x4x3/8x0'-8" LG (LLV)
CLR
1"
1/4
1/4
(E) STL BEAM PER PLAN
(1) 5/8"Ø MB CENTERED
IN ANGLE & IN HSS 2 1/2"
VERT SLOTTED HOLE
1 1/2"
A SECTION
HSS COLUMN PER PLAN,
BOLT HOLES AT CL
A
SEAM / SIDE LAPINT.END
MAX UNSHORED SPAN
REINFGAGEMARK
EDGE TRIPLEDOUBLESINGLE
12'-0"12'-0"10'-6"1 1/2"16D1 ----VSC @ 24" OCFASTENERS
@ 6" OC
FASTENERS
@ 12" OC
FASTENERS
@ 12" OC
D1
2 1/2"3 1/2"
1 3/4"
1 1/2"6"
VERCO PLB-36
STEEL DECK
TYPE
TOTAL
THICKNESS (t)
CONCRETE
TYPE
STEEL DECK
ATTACHMENT PATTERN
12'-0"11'-0"10'-0"6 1/4"20D2 #4 @ 12" OC
EW
3000 PSI
LTWT CONC
*3/4"Ø PUDDLE
WELD @ 12" OC VSC @ 24" OC*3/4"Ø PUDDLE
WELD @ 12" OC
*3/4"Ø PUDDLE
WELD @ 12" OCVERCO W-3
D2
3/4" CLR
3 1/4"
3"
NOTES:
1. SEE GENERAL NOTES FOR MORE INFORMATION.
2. VSC = VERCO SIDELAP CONNECTION.
3. * 3/4" VISABLE DIAMETER PUDDLE WELDS
(MINIMUM FUSION AREA SHALL BE 1/2" DIAMETER
PUDDLE WELDS).
AISC STD HORIZ SHORT SLOTTED HOLES
OVERLAPPING 15/16" Ø HOLES ONLY
ALLOWING FOR INSTALL OF 3/4"Ø BOLTS
NEW SLAB PER PLAN
1/4
1/4
(E) CMU WALL
CONT PL1/2 TO MATCH WALL
THICKNESS W/ 3/4"Ø x 3 3/4"
EMBED HILTI 'KB-TZ2' AT
GROUTED CELLS
(4 MIN)
1 1/2"
TYP
3 1/2"
TYP
1 1/2"
3/4
EA LOW
FLUTE
(E) SLAB
7"
7"
2"
CL
2" 3"3" 2"
A
A WALL PLATE
Wx
PER
PLAN
(4) 3/4"Ø x 3 3/4"
EMBED HILTI
'KB-TZ2' (ICC
ESR-4266)
PL1/4
HSS COL
PER PLAN
NOTE:
ACCEPTABLE TO USE 3/4"Ø x 4" EMBED HILTI HY 270 EPOXIED THREADED
ROD + HIT-SC IN LIEU OF KB-TZ2 WHERE A CELL VOID IS ENCOUNTERED.
3"
SCAN SLAB TO LOCATE AND AVOID
CUTTING (E) REINF. NEATLY CHIP
AWAY CONC TO INSTALL COL. FILL
VOID WITH NON-SHRINK GROUT
FOR STEEL COL TO
BEAM CONN SEE 14
S5.0-4
1/2"
BEAM BELOW
EXTEND ANGLE (3) WEBS
PAST OPENING EA END
TYP
THIS IS
CONSIDERED A
SINGLE OPENING
WEBS OF DECKL1 3/4x1 3/4x 1/4 ON
TOP OF DECK (TYP)
NOTES:
1. DO NOT CUT MORE THAN (2) ADJACENT WEBS
2. INDIVIDUAL HOLES LESS THAN 6"Ø AND CUTTING NO MORE THAN (1) WEB, DO NOT
REQUIRE REINFORCING SHOWN.
3. ANGLES SHALL BE PLACED ON TOP OF DECK
4. IF DIMENSION "A" IS GREATER THAN 4x"D1", 4x"D2" OR 32" WHICHEVER IS GREATER,
THERE SHALL BE NO RESTRICTION OF DIMENSION "B".
5. IF DIMENSION "B" IS GREATER THAN 4x"D1", 4x"D2" OR 32" WHICHEVER IS GREATER,
THERE SHALL NOT BE NO RESTRICTION ON DIMENSION "A"
6. IF DIMENSION "A" AND "B" ARE LESS THAN 4x"D1", 4x"D2" OR 32" WHICHEVER IS
LARGER, THE GROUP OF OPENINGS SHALL BE CONSIDERED AS A SINGLE OPENING,
AND SHALL BE REINFORCED AS REQUIRED FOR THE LARGER OPENING.
"A"
"B"
"D1"
"D2"
1/8 1/2"
TYP ADJ
TO CUT
WEBS
MC6x12
(E) MC6x12
L3x3x1/4 BRACE
@ EA HANGER
2 MIN
1
(E) L2 1/2x2 1/2
HANGER AT EA
(E) ROOF BM
1/4 2-12
1/4
3" MIN EA END
PL 3/4x5x0'-8"
(E) ROOF BM
1/4
1/4
1/4
Lx TO PL
4"
TYP
1"
EQ
EQ
PL1/2x6x0'-6"
(2) 1/2"Øx3" HILTI 'KH-EZ'
(ICC ESR-3027)
L4x4
PER PLAN
A END CONNECTION
1/2"
1"TYP
1"L4x4
PER PLAN
L4x4
PER PLAN
PL1/4x2 1/2x0'-3 1/2" W/
(2) 1/2"Ø THRU BOLTS
1/4
PL TO Lx
B BEAM TO BEAM CONNECTION
PL3/8x4x0'-8"
HSS HEADER
PER PLAN
Lx
PER
EDGE OF NEW OPENING
IN WALL
HSS JAMB
PER PLAN
1/4
1/4
TYP
NOTE:
SEE DETAIL FOR INFORMATION
NOR SHOWN.
1/S5.0-2
1/S5.0-2
~ 21" (VIF)
1/4
EA SIDE
OF WEB
PIPE 16 STD x 3/8 WALL
THICKNESS x 8" LG
NOTE:
PROVIDE TEMP SHORING FOR EXISTING Wx BEAM
PRIOR TO CUTTING NEW HOLE.
DO NOT REMOVE SHORING UNTIL PIPE IS
INSTALLED AND WELDED TO EXISTING Wx BEAM.
CL OPENING
CL
W
x
B
E
A
M
AN
D
O
P
E
N
I
N
G
16"
(E) W21x68 (VIF)
2' - 0" MAX
CL SPAN
N
I
R
No. S3866
Exp. 3/31/26
G
T
R
E
TATSS
E OFILACFO
UCTURA
R
L
R
STERED P L
OFESSIONA
N
E
R
AI
E
ENGI
WILLI
H.THORP
................
.
.
.
...............................
.
.
.
...............
E
AM
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
BID SET
FINAL PERMIT/CONFORM SET
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
2/11/2026 11:51:33 AM
Autodesk Docs://Santa Ana Library/22575-01 Santa Ana Library_Struct_SR22.rvt
S5.0-1
TYPICAL STEEL
DETAILS
JO
B
N
U
M
B
E
R
:
2
1
0
0
5
8
8
;
J
O
B
N
A
M
E
:
S
a
n
t
a
A
n
a
L
i
b
r
a
r
y
R
e
no
v
a
t
i
o
n
;
S
H
E
E
T
:
S
5
.
0
-1;
P
D
:
M
J
S
;
P
M
:
E
S
1" = 1'-0"1STEEL BM TO STEEL BM CONNECTION
1 1/2" = 1'-0"2FLANGE BRACE TO EXISTING CONC SLAB
1 1/2" = 1'-0"3Wx BEAM TO EXISTING CONCRETE BEAM
1 1/2" = 1'-0"4FLANGE BRACE TO (E) CONC SLAB EDGE
1 1/2" = 1'-0"5HSS TOP CONNECTION AT SLAB
1" = 1'-0"6EMBED PLATE TO CONCRETE BEAM/WALL1 1/2" = 1'-0"10Wx BEAM TO HSS COL CONN
1" = 1'-0"8ELEVATOR GUIDE RAIL SUPPORT
1" = 1'-0"9HSS TOP CONNECTION AT BEAM
1" = 1'-0"11STEEL DECK SCHEDULE
1" = 1'-0"12TYPICAL BEAM TO (E) CMU WALL
1" = 1'-0"13TYP STIFFENED DECK SLEEVE DETAIL
REV # DESCRIPTION DATE
ASI#020 ASI 04.03.2025
#196 RFI 06.02.2025
#142 RFI 04.29.2025
#86 RFI 03.03 2025
#264 RFI 09.09.2025
#365 RFI 02.04.2026
ASI#020
1" = 1'-0"14SECTION
ASI#020
1 1/2" = 1'-0"7Lx BEAM CONNECTIONS1" = 1'-0"16ALT HSS HEADER TO HSS JAMB CONN
#86
#264#365
#142
1" = 1'-0"15NEW OPENING IN EXISTING Wx BEAM
#196
#196
#86
ISSUE DATE
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
(E) CONC FIL
OVER MTL DECK
(E) Wx BEAM
PER PLAN
HSS COLUMN
PER PLAN
1/4 3 MIN
1/4 3 MINTYP HSS
TO (E) Wx
N
I
R
No. S3866
Exp. 3/31/26
G
T
R
E
TATSS
E OFILACFO
UCTURA
R
L
R
STERED P L
OFESSIONA
N
ER
AI
E
ENGI
WILLI
H.THORP
...............
.
.
.
.
...............................
.
.
.
...............
E
AM
18400 Von Karman Ave., Suite 600
Irvine, CA 92612
O: 949.252.1022
F: 949.252.8082
www.kpff.com
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
S5.0-5
STEEL DETAILS
REV # DESCRIPTION DATE
#86 RFI 03.03 2025
#365 RFI 02.04.2026
1 1/2" = 1'-0"1ALT HSS TOP CONN AT Wx BEAM
#365
#365#86
ISSUE DATE
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
NOTES:
1. DO NOT CUT OR DAMAGE (E) REIN.
BARS. USE NON-DESTRUCTIVE
TESTING TO LOCATE (E) REINF STEEL
FOR POST INTALLED ANCHORS.
(E) CONCRETE WALL
(f'c = 2500 PSI MIN)
3"x3"x12GA x 0'-3" LG CLIP W/
1/2"Ø x 3 1/4" EMBED HILTI 'KB-
TZ2' TO WALL AND (4) #10 SMS
EQUALLY SPACED EA WAY)
TOP TRACK PER
STUD WALL, TYP
3
S6.0-1
400T150-54 LEDGER W/ (2) #10
SMS TO BOX HEADER STUD
(T&B) AND 3/8"Ø x 2" EMBED
HILTI 'KB-TZ2' @ 2'-0" OC
STAGGERED
TYP
1 1/2"
FROM LEDGER FLANGE, TYP
END BOX HEADER TRACK 1" MAX
(E) CONCRETE WALL
(f'c = 2500 PSI MIN)
NOTES:
1. DO NOT CUT OR DAMAGE (E) REIN.
BARS. USE NON-DESTRUCTIVE
TESTING TO LOCATE (E) REINF STEEL
FOR POST INTALLED ANCHORS.
16GA x 1 1/2" x 1 1/2" x STUD
WIDTH CLIP W/ (3) #10 SMS AT
EA LEG (EQUALLY SPACED),
TYP AT BOTH SIDES
BOX HEADER PER PLAN
1
1 MIN
1.5 MAX
TOP CONN
PER
(4) #10 SMS
CEILING PER ARCH
400S162-43 @ 16"
OC, TYP
400S162-43 BRACE
@ 48" OC
CONT 400T150-54 W/
(2) #10 SMS EACH
STUD
GLAZING PER ARCH,
CONTRACTOR TO VERIFY
SYSTEM CAM ACCOMODATE
1.5" VERTICAL MOVEMENT
FROM FLOOR ABOVE
TOP BRACE
CONN
PER 3
S6.0-1
3
S6.0-3
ASSEMBLY BY OTHERS
SHIM BLOCK
(E) CONC SLAB
3/8"∅HILTI 'KB-TZ2'
W/ 2" NOMINAL
EMBED @ 48" OC
(ICC ESR-4266)
GLAZING AND
ASSEMBLY
BY OTHERS
L3x3x16GA x 1'-3" LG W/ (2)
1/2"Ø HILTI 'KB-TZ2' W/
2" EMBED
(3) #10 SMS
1'-0" MIN
TYP
1 1/2"
WHERE BRACE DOES NOT ALIGN W/
LOW FLUTE OF DECKB
A PARALLEL TO DECK
PL10GAx0'-8" (GR50) W/
(2) 1/2"Ø HILTI 'KB-TZ2' W/
2" EMBED AT EACH LOW
FLUTE (SPACING=4" MIN)
1/16 3-6
1/16 3-6 (4) #14 SMS
AS ALTERNATE
B SECTION
TYP
1 1/2" MIN
L3x3x16GA x 1'-3" LG W/
(2) 1/2"Ø HILTI 'KB-TZ2' W/
2" EMBED (ICC ESR-4266)
(3) #10 SMS
TYP
1 1/2" MIN
C PERPENDICULAR TO DECK
TRIM FLANGE OF ONE
TRACK AND EXTEND
WEB OVER TRACK
TOP TRACK (TYP)TOP TRACK
(TYP)
(4) #10 SMS AT
TRACK WEBS
WALL STUD (TYP)
1"
1"
4"
1"
12"
4"
1"
(2) SMS OR (2) HILTI
X-U END OF EACH
TRACK PER
TOP TRACK
3" (TYP)
(3) #10 SMS EACH
SIDE OF SPLICE
(6 TOTAL PER
SIDE)
TOP TRACK
SPLICE PIECE SHALL BE
SAME
SIZE AND GA AS STUDS
A DETAIL
B DETAIL
3
S6.0-1
600T150-54
A SECTION
#10 SMS EA
STUD EA
FLANGE
(4) #10 SMS
@ 12" OC
POST PER
PLAN (MAX
HT = 8'-0")
STUD PER
SCHED
600S162-54
A
BOX TOP TRACK
(UNPUNCHED)
(2) #10 SMS OR
PDF EA TRACK
EA FLANGE
SISTERED STUD
TP POST W/ #10
SMS @ 6" OC OR
PDF @ 12" OC
STAGGERED
(E) CEILING
LEVEL
A SECTION
(E) CMU
WALL
(2) #10 SMS AT
EA CLIP
TOP TRACK
PER SCHED
CLIP L10GAx3x3x0'-3"
@ 36" OC W/ 1/4"Ø x 1
1/2" EMBED SIMPSON
TTN25134PFSS
STUD WALL PER
SCHED 4
S6.0-1
(2) 1/4"Ø x 1 1/2"
EMBED SIMPSON
TITEN SCREWS
STUD PER
SCHED
BOXED TOP
TRACK
L3x3x12GA W/ (1) 1/2"Ø x
2" EMBED HILTI 'KB-TZ2'
INTO (E) SLAB
(E) CONC SLAB
CONN AT TOP, BOT
AND MID-HEIGHT
OF STUD WALL
TYP
1/2" CLR
L3x3x12GA T&B W/
(2) #12 SMS TO
TOP TRACK
9" MAX
400S162-33 @ 16"OC
L3x3x10GA W/
(2) #10 SMS EA
LEG @ EA STUD
TYP
#8 SMS @ 16"OC EN/FN/BN
1/2" THK PLYWOOD SHTG
12" MIN
BOX BEAM PER PLAN
CEILING JOIST PER
6
S6.0-4
(E) DBL STUDS @ 16" OC
(E) CRC TIE (WHERE OCCURS)
400S162-48 @ 4'-0" OC
HORIZ & VERT
CLIP L3x3x3"x18 GA W/
(3) 1/4" SMS EA LEG
CONT 4"x18GA BK'G
PLATES PER
(E) C6
+/- VIF
9"
STUD TO BEAR
ON BACK'G PL
(6) 1/4" SMS
(4) 1/4" SMS
(E) 1 1/2" CRC
FRM'G FOR LATH
& PLASTER
B SECTION
A
6/S6.0-2
SEE DETAIL
FOR SOFFIT FRAMING
WHERE REQUIRED
16
S6.0-3
(E) PALSTER
& CRC FRM'G
4" VERT STUD
4" HORIZ STUD
CONT BACKING
PLATES
(E) DBL STUDS
A PLAN
TYP
6' - 0"
TYP
6' - 0"
TYP
6' - 0"
TYP
6' - 0"
BRACE PER
15/S6.0-3
METAL STUD
WALL PER ARCH
& 4/S6.0-1
METAL STUD WALL
PER ARCH & 4/S6.0-1
TYP
TYP
45°
CUT AND BEND BRACE FLANGE
TO FORM 1 1/4" RETURN W/
(2) #10 SMS TO ADJACENT TRACK,
TYP EACH SIDE, EACH ENDEXTEND BRACE WEB OVER
ADJACENT TRACK W/
(4) #10 SMS MIN, SPACED
@ 1" OC STAGGERED
(PROVIDE 1" EDGE DISTANCE,
1" END DISTANCE)
TYP EACH END
A
CONT TOP TRACK TO
MATCH SIZE AND GAUGE
OF STUD WALL
400S162-43 BRACE (LENGTH<10'-0") OR
(2) 400S162-43 BRACE (LENGTH <15'-0")
SECTION AT DBL STUD BRACE
(2) STUDS #10 SMS @ 36" OC W/
(8) #10 SMS @ 3/4" OC
AT END
A SECTION
NOTE:
AT BRACE CONNECTION TO (E) CONC WALL,
CUT AND FOLD BRACE WEB 4".
USE (2) 1/4"Ø HILTI 'KH-EZ' x 1 5/8" NOM
EMBED (ICC ESR-3027).
EQ
EQ
(E) CONC
WALL
(E) DBL STUD
(2) #10 SMS
L2x2x18GA W/
#10 SMS EA JOIST
400S162-43
@ 16" OC
600S162-54 JOIST
@ 16" OC
(E) CRC PER
20'-0" MAX
(E) 6" TALL
CHANNEL
600T150-54 LEDGER W/
(2) #10 SMS TO JOIST T&B &
3/8"Øx2" EMBED HILTI
'KB-TZ2' @ 16" OC STAGGERED
(E) OBSTRUCTION
SUSPENDED
SOFFIT
PER
SOFFIT HANGER
SOFFIT JOIST HANGER
PER
(E) ROOF MTL DECK
(2) #14 SMS EA SIDE OF STUD
(INTO LOW FLUTE ONLY)
WALL BRACING
WHERE WALL NOT
COVERED PER &
1 1/2" FLANGE CONT TRACK
TO MATCH GAUGE OF HANGER W/
#12 SMS AT EA STUD FLANGE TO TRACK
5
S6.0-4
5
S6.0-4 3
S6.0-2
8
S6.0-4
AB
C
C CATWALK CHANNEL JOIST END
ALTERNATE CONNECTION D JOIST HANGER
ALTERNATE CONNECTION
(E) LEDGER
(E) CHANNEL
E HANGER UNDER OBSTRUCTION
ALTERNATE CONNECTION
F HANGER PARALLEL TO DECK
ALTERNATE CONNECTION
NOTES:
1. DO NOT CUT OR DAMAGE (E) REINF BARS. USE NON-DESTRUCTIVE
TESTING TO LOCATE (E) RENF STEEL FOR POST INSTALLED ANCHORS.
2. SEE A5.0-1 FOR ARCHITECTURAL APPLICATION OF THIS DETAIL.
CEILING SUPPORT
JOISTS
L2x2x12GA CLIP
AT EA JOIST W/
#12 SMS TO JOIST &
0.157"Øx1" HILTI 'X-U' PDF
TO (E) CHANNEL
(E) CHANNEL
(E) DBL STUD
400S162-43
SPLICE STUD
(E) CHANNEL
A SECTION
SCALE:1 1/2"=1'-0"
B DETAIL
SCALE:1 1/2"=1'-0"
N
I
R
No. S3866
Exp. 3/31/26
G
T
R
E
TATSS
E OFILACFO
UCTURA
R
L
R
STERED P L
OFESSIONA
N
E
R
AI
E
ENGI
WILLI
H.THORP
................
.
.
.
...............................
.
.
.
...............
E
AM
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
BID SET
FINAL PERMIT/CONFORM SET
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
2/11/2026 11:51:34 AM
Autodesk Docs://Santa Ana Library/22575-01 Santa Ana Library_Struct_SR22.rvt
S6.0-3
TYPICAL METAL
STUD DETAILS
JO
B
N
U
M
B
E
R
:
2
1
0
0
5
8
8
;
J
O
B
N
A
M
E
:
S
a
n
t
a
A
n
a
L
i
b
r
a
r
y
R
e
no
v
a
t
i
o
n
;
S
H
E
E
T
:
S
6
.
0
-3;
P
D
:
M
J
S
;
P
M
:
E
S
1 1/2" = 1'-0"4METAL STUD WALL TO (E) WALL CONN
1 1/2" = 1'-0"5BOX HEADER TO CONCRETE WALL
1 1/2" = 1'-0"6BOX HEADER TO BOX HEADER CONN1 1/2" = 1'-0"10SUSPENDED BULKHEAD
1 1/2" = 1'-0"11BOTTOM OF GLASS ANCHORAGE 1 1/2" = 1'-0"3TYPICAL BRACE CONN DETAIL
1" = 1'-0"1TYPICAL TOP TRACK AT CORNER
1" = 1'-0"2TYPICAL TOP TRACK SPLICE
1 1/2" = 1'-0"7LOW WALL TOP CONN TO POST
1 1/2" = 1'-0"8FURRING WALL TOP CONN
1 1/2" = 1'-0"9LOW WALL END CONN TO (E) STRUCT
1 1/2" = 1'-0"12PARAPET AT PORTAL
REV # DESCRIPTION DATE
ASI#020 ASI 04.03.2025
#365 RFI 02.04.2026
#250 RFI 08.20.2025
1" = 1'-0"13STUD DETAIL
ASI#020
1/4" = 1'-0"14ALT WALL BRACING PLAN
1 1/2" = 1'-0"15HORIZ PARTIAL HEIGHT WALL BRACE
#250
#250
1" = 1'-0"16SOFFIT HANGING DETAIL
#365
#365
ISSUE DATE
PERMIT SET 1ST ISSUANCE
BID SET
FINAL PERMIT/CONFORM SET
09/29/2023
04/30/2024
08/02/2024
REV # DESCRIPTION DATE
1 BACKCHECK REV-1 03.01.2024
2 CITY REVIEW REV-1 08.02.2024
3 CITY REVIEW REV-2 10.18.2024
4 CITY REVIEW REV-3 01.27.2025
5 CITY REVIEW REV-4 04.07.2025
6 CITY REVIEW REV-5 06.27.2025
7 CITY REVIEW REV-6 10.24.2025
8 CITY REVIEW REV-7 02.06.2026
9 CITY REVIEW REV-8 03.25.2026
REVIEWED FOR CONSTRUCTABILITY:
80470
SEAN THOMAS. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
RECOMMENDED FOR CONSTRUCTION:
62968
JASON GABRIEL. P.E. RCE NO:
PRINCIPAL CIVIL ENGINEER
DATE:
1
3
/
4
"
1
1
/
4
"
3"
1
1
/
4
"
MAX
1/8" GAP
1 1/4"
3"
1 1/4"
UNIT PER MECH DWGS
(E) MTL DECK
(E) BM PER PLAN
NON-COMBUSTIBLE SOLID SHIM
UNDER CURB TO MATCH DECK
PROFILE THICKNESS (HSS 1 1/2
x1 1/2x1/8x0'-6" LONG @ 4'-0" OC
MAX TACK WELDED TO BASE
STRUCTURAL STEEL
L4x4x1/4 TYP AT OPENINGS UNO
(MAY BE OMITTED AT 'X' < 2'-0") -
(MAY BE OMITTED IF INTERNAL MECH'L UNIT
FRAME PROVIDES EQUIVALENT SUPPORT)
PRE-FABRICATED CURB
BENT PL1/4 NS & FS
(2) 3/4"Ø BOLTS ON 3 1/2"
GAGE (4 BOLTS TOTAL)
(2) 3/4"Ø BOLTS
L6x6x3/8 ALIGN FLANGE
WITH LOW FLUTE FOR DECK
WELDING
1/4
1/4
1/4
1/4
TYP
1/4"Ø SMS ((4) EA SIDE,
(16) TOTAL)
14
"
2
9
3
/
4
"
85 5/8"
CG MAX WEIGHT:
326#
29
"
#14 SMS EA LEG
1/2"Ø 12" OC
DECK TO Lx
TYP
3"
NOTES:
1. PROVIDE TRAPEZE NO MORE THAN 10'-0" APART ALONG ENTIRE LENGTH OF DUCT.
2. PROVIDE NO LESS THAN ONE LONGITUDINAL BRACE (LB) PER SPAN OF DUCT.
LONGITUDINAL BRACE TO OCCUR EA SIDE.
3. PROVIDE TRAPEZE @ 2'-0" MAX FROM LOCATIONS WHERE DUCT CHANGE DIRECTION.
4. EXEMPTION FROM BRACING SHALL COMPLY WITH REQUIREMENTS OF CBC 2019
SECTION 1617.1.25 AND ONLY WHEN DUCTWORK WOULD NOT IMPACT AND DAMAGE
ADJACENT COMPONENTS.
PLAN: EXAMPLE LAYOUT
(FOR REFERENCE ONLY)
1/2"Ø HANGER
ROD TYP OF
(2) LOCATIONS
ROD STIFFENER
TYP AT EA HGR
1 MIN
1
NUT T&B
TYP
UNISTRUT 'P1000 HS' BRACE
(LENGTH = 9'-6" MAX) TYP
'SPF200' W/ (2) 1/2"Ø MIN
BOLT AND SPRING NUT
TO BRACE. TYP EA
BRACE, EA END
1
BRACING SPACING
TB 20'-0"
LB
EQ
*
E
Q
*
LBLB
LB
LB
TB
TB TB
LB
LB
TB
A
A SECTION AT LONGITUDINAL BRACE
40'-0"
1
UNISTRUT 'P1000' BRACE
(LENGTH = 9'-6" MAX) TYP
TY
P
3"
TY
P
3"
UNISTRUT 'P1064' OR
LONGITUDINAL
BRACE AS OCCURS
UNISTRUT 'P1000'
TYP
DUCT PER MFR
#10 SMS @ 12" OC
MAX TYP
UNISTRUT 'P1064'
TB
MAX
2'-0"
UNISTRUT 'P1000'
TYP
TY
P
3"
TY
P
3"
'SPF200' W/ (2) 1/2"Ø MIN
BOLT AND SPRING NUT
TO BRACE. TYP EA
BRACE, EA END
NUT T&B
TYP
PROVIDE UNISTRUT 'P1064'
AT HGR ROD WHERE BRACE
DOES NOT OCCUR
* ONLY ONE TRAPEZE REQUIRED WHEN THESE
DIMENSIONS DO NOT EXCEED 4'-0" TOTAL
1/2" Ø HILTI 'KB-TZ2' WEDGE ANCHOR
W/ 3 1/4" MIN EMBED
(ICC ESR-1917)
(E) CONC OVER MTL
DECK PER PLAN
3"
3
"
4' - 0" MAX
'H
'
A
B B
1
1 MIN
1/2"Ø HANGER
ROD TYP OF
(2) LOCATIONS
ROD STIFFENER TYP
AT EA HGR WHERE
TRANS OR LONG
BRACE OCCURS
1/2" Ø HILTI 'KB-TZ2' WEDGE
ANCHOR W/ 3 1/4" MIN EMBED
(ICC ESR-1917)
UNISTRUT 'P1000' HS
DIAGONAL BRACE
(LENGTH = 9'-6" MAX)
'SPF200' W/ (2) 1/2"Ø MIN BOLT
AND SPRING NUT TO BRACE.
TYP EA BRACE, EA END.
1/2"Ø HILTI 'KB-TZ2' W/ WASHER
AT EA HANGER W/ 3 1/4" MIN
EFF EMBED, TYP AT CL OF
LOW FLUTE
(E) CONC OVER MTL
DECK PER PLAN
PIPE/CONDUIT & CLAM
TYP
'P2864' OR LONG
BRACE AS OCCURS
UNISTRUT 'P1000 HS'
TYP
NUT T&B, TYP
COUPLER NUT TYP
TY
P
3"
1
1 MIN
P1000 BRACE, TYP
'SPF200' W/ (2) 1/2"Ø MIN BOLT
AND SPRING NUT TO BRACE.
TYP EA BRACE, EA END.
P1000 TYP
NUT T&B TYP
ROD STIFFENER, TYP
HGR ROD, TYP
PROVIDE P2864 @ HGR
ROD WHERE BRACE
DOES NOT OCCUR
B SECTION
SNUG TIGHT
TO EA NUT
NUT SNUG TIGHT
TO SWIVEL CONN
HGR ROD
M2050
1/2"Ø HILTI 'KB-TZ2' W/
WASHER, TYP
EM
B
E
D
3
1
/
4
"
SWIVEL CONNECTION
IN LIEU OF COUPLER NUT
WHEN BRACING IS OMITTED
3/8" Ø x 1" HHCS
'P1000 T'
'P2485' CRADLE
CLIP @ 12" OC
HGR ROD PER
SECTION
'P3008' NUT
A SECTION
AT ROD STIFFENER
TBTB
TB
TB
LB
LB
LB
LB
TB
LB
LB
*ONLY ONE TRAPEZE REQUIRED WHEN THESE
DIMENSIONS DO NOT EXCEED 4'-0" TOTAL
(SEE NOTE 10)
2'-0" MAX, TYP
SEE NOTE 8 FOR LB SPACING
SEE NOTE 7 FOR TB SPACING
CONTRACTOR'S OPTION TO
ROTATE 'LB' OR 'TB' 180
DEGREES
PLAN: EXAMPLE LAYOUT
(FOR REFERENCE ONLY)
NOTES:
1. BRACING MAY BE OMITTED FOR PIPE/ CONDUIT WHEN 'H' IS LESS THAN OR EQUAL TO 12" OR IF TOTAL WEIGHT
OF ALL PIPE/ CONDUIT AT TRAPEZE IS ≤ 10PLF.
2. IF 'H' IS GREATER THAN 12". THE MAX DIAMETER FOR UNBRACED PIPE SHALL BE 1" (2 1/2" FOR CONDUIT).
3. IF BRACING IS OMITTED. PROVIDE UNISTRUT M2050 SWIVEL CONN @ EA HGR ROD IN LIEU OF COUPLER NUT.
4. OMIT STIFFENER AT HANGER ROD AT LOCATIONS WHERE BRACE DOES NOT APPLY.
5. SEE 3/- "TYPICAL PIPE/ CONDUIT WEIGHT AND MAX SUPPORT SPACING" FOR ADDITIONAL INFO (DETERMINE
SPACING BASED ON SMALLEST ELEMENT SUPPORTED).
6. TOTAL UNIFORM WEIGHT OF ALL PIPE/ CONDUIT AND TRAPEZE SHALL NOT EXCEED 35 PLF.
7. PROVIDE TRANSVERSE BRACE (TB) AT SPACING PER 3/- (PARALLEL TO TRAPEZE).
8. PROVIDE LONGITUDINAL BRACE PAIR (LB) EVERY AT EVERY OTHER PER TRANSVERSE BRACE
(PERPENDICULAR TO TRAPEZE).
9. PROVIDE NO LESS THAN ONE LONGITUDINAL BRACE PAIR (LB) PER SPAN OF PIPE / CONDUIT.
10. PROVIDE TRAPEZE AT 2'-0" MAX FROM LOCATIONS WHERE PIPE/ CONDUIT CHANGES DIRECTION.
11. ALL STRUT COMPONENTS AND PIPE CLAMPS SHALL BE MANUFACTURED BY UNISTRUT.
12. PROVIDE 1/2"Ø HHCS AND SPRING NUT AS REQUIRED FOR CONNECTION TO OPEN FACE OF STRUT TYP.
13. SUBMIT PROPOSED LAYOUT FOR SEOR/AOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION.
14. CONTACT SEOR IF CONTENTS OF PIPE ARE CLASSIFIED HAZARDOUS MATERIAL.
32" Ø MAX
7/8"
2" x 18GA MIN STRAP
TYP
'H
'
DUCT WT 15 PLF (MAX)
TOP CONNECTION
DUCT
AREA SHALL BE NOT
GREATER THAN 6
SQUARE FEET
1/2" Ø HILTI 'KB-TZ2' W/
2" MIN EMBED AT
CENTER OF STRAP
TYP (SEE NOTE 7)
(E) CONC OVER
MTL DECK
RECTANGULAR DUCT
NOTES:
1. CONTACT SEOR IF AREA OF DUCT
EXCEEDS 6 SQUARE FEET AND
1) H>12".
2) WEIGHT > 10 PLF.
2. MAX SPACING OF STRAP SUPPORT
SHALL NOT EXCEED 10'-0" (DO NOT
EXCEED SMACNA CRITERIA).
3. ALL DUCTWORK SHALL BE SHEET
METAL CONSTRUCTED OR SPIRAL,
ERECTED, AND TESTED IN
ACCORDANCE WITH THE MOST
RESTRICTIVE OF LOCAL
REGULATIONS, PROCEDURES
DETAILED IN THE ASHRAE
HANDBOOK OR FUNDAMENTALS,
CHAPTER 6 OF CALIFORNIA
MECHANICAL CODE, OR THE
APPLICABLE STANDARDS ADOPTED
BY THE SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION.
4. THE CONTRACTOR SHALL VERIFY
ALL DIMENSIONS PRIOR TO
STARTING CONSTRUCTION. THE
SEOR SHALL BE NOTIFIED OF ANY
DISCREPANCIES.
5. DETAIL DOES NOT PERTAIN IF
DUCTWORK CARRIES TOXIC, HIGHLY
TOXIC, OR FLAMMABLE GASES OR
USED FOR SMOKE CONTROL.
CONTACT SEOR IF DUCTWORK
APPLIES TO SUCH USES.
WIDTH PER PLAN
SLAB OPENING
4" TYP
CONTRACTOR'S
OPTION TO PLACE
ANGLE ON TOP OF
FLOOR ON (2)
OPPOSITE SIDES OF
DUCT TOTAL
ANGLE AROUND
OPENING PER
PLAN
L3x3x10GA EA SIDE
OF EA DUCT, TYP
ATTACH TO DUCT W/
(3) #10 SMS
COPE HORIZ LEG AND
BEND VERT LEG.
ATTACH TO
INTERSECTING ANGLE
W/ (3) #14 SMS EA END
T/ SLAB
T/ SLAB
COPE HORIZ LEG AND
BEND VERT LEG.
ATTACH TO
INTERSECTING ANGLE
W/ (2) #14 SMS EA END
(E) CONC OVER MTL
DECK PER PLAN
(E) CONC OVER MTL
DECK PER PLAN
DUCT PER MECH
1/2"Ø x 2" EMB HILTI
KB-TZ2 EXP ANCH AT
EA CORNER
TYP
2" EMB
TYP
1" MAX
CL LOW FLUTE (E) CONC OVER MTL
DECK PER PLAN
(ORIENTATION AS
OCCURS)
1/2"Ø HILTI 'KB-TZ2'
W/ WASHER TYP
4'-0" MAX
NOTES:
1. THE MAX DIAMETER FOR PIPES SHALL BE 1", THE MAX DIAMETER FOR CONDUIT SHALL BE 2/12 "
(LIMIT 12 TOTAL PIPES/CONDUIT PER TRAPEZE).
2. PIPE & CONDUIT CLAMPS TO BE SELECTED BY OTHERS.
3. SEE "TYPICAL PIPE/CONDUIT WEIGHT" & MAX SUPPORT SPACING" FOR ADD'L INFO.
4. PROVIDE SUPPORTS @ 2'-0" MAX FROM LOCATIONS WHERE PIPE / CONDUIT CHANGES DIRECTION
AND FROM WHERE PULLBOX IS LOCATED.
5. STRUT COMPONENTS SHALL BE MANUFACTURED BY UNISTRUT.
6. PROVIDE 1/2 "Ø HHCS & SPRING NUTS AS REQUIRED FOR CONN TO OPEN FACE OF STRUT TYP.
NUT T&B TYP
P1000 HS TYP
PIPE/CONDUIT TYP (SEE NOTE 1)
P1064 TYP
1/2"Ø HGR ROD
COUPLER NUT TYP
EMB
3 1/4"
MAX
1"CL LOW FLUTE (E) CONC OVER MTL DECK PER
PLAN ORIENTATION AS
OCCURS)
'H'
CLEVIS HANGER
1/2"Ø HGR ROD
COUPLER NUT
(SEE NOTE 3)
1/2 Ø HILTI 'KB-TZ2'
W/ WASHER
NUT T&B
1" MAX PIPE 2 1/2"
MAX CONDUIT
NOTES:
1. IF 'H' IS GREATER THAN 12", THE MAX DIAMETER FOR UNBRACED PIPE SHALL BE 1" (2/1Ø " FOR
CONDUIT).
2. SEE "TYPICAL PIPE/CONDUIT WEIGHT & MAX SUPPORT SPACING" FOR ADDITIONAL INFO.
3. PROVIDE SUPPORTS @ 2'-0" MAX FROM LOCATIONS WHERE PIPE / CONDUIT CHANGES DIRECTION
AND FROM WHERE PULLBOX IS LOCATED.
4. ALL STRUT COMPONENTS & PIPE CLAMPS SHALL BE MANUFACTURED BY UNISTRUT.
5. PROVIDE 1/2 "Ø HHCS & SPRING NUT AS REQD FOR CONN TO OPEN FACE OF STRUT TYP.
VERTICAL SUPPORT
PIPE/ CONDUIT WEIGHT
DIAMETER
(IN)
4
PIPE WEIGHT
(PLF)
CONDUIT WEIGHT
(PLF)
3 1/2
3
2 1/2
2
1 1/2
1
3/4
1/2
16.3
13.4
10.8
7.9
5.1
3.6
2.1
1.4
1.0
10.2
8.4
6.5
4.8
2.9
2.0
1.0
0.7
0.4
PIPE/ CONDUIT WEIGHT
DIAMETER PIPE CONDUIT
6'-0"7'-0"1/2"
7'-0"3/4"7'-0"
7'-0"1"7'-0"
8'-0"1 1/4"8'-0"
9'-0"1 1/2"9'-0"
10'-0"2"10'-0"
10'-0"> 2 1/2"10'-0"
NOTE: TABULATED WEIGHTS ARE BASED ON
SCHEDULE 40 PIPES AND EMT CONDUIT (FILLED
W/ WATER) WEIGHTS PER OPM-0043-13.
NOTE: COORDINATE WITH MECH/ PLUMBING/
ELEC CODES FOR PERMISSIBLE SPACING.
MAX SPAN
BETWEEN
SUPPORTS
20'-0"
10'-0"
MAX. TRAVERSE BRACE SPACING
6'-6"
GA
< 20 PLF
20 PLF - 40 PLF
40 PLF - 60 PLF
TYP
2"
UNISTRUT P2786
EA FLANGE, TYP
UNISTRUT P1000
CROSS w/ 'P1047'
EA END WHERE
REQ'D
UNISTRUT P1001 SPACING
TO MATCH TRAPEZE/ HGR
SPACING
THREADED BOLT
w/ SPRING NUT @
HGR/ BRACE
(E) ROOF
GIRDER PER
PLAN
(E) ROOF DECK PER PLAN
23" MAX
10'-0" MAX OPENING
'A34' CLIP EA SIDE
TYP
(N) BOT PL
(E) PL
(E) HGR
(N) HGR
(4) 10d NAILS
'2L'
'L'
3" MAX
TYP
1" CLR
(E) CONT MEZANNINE
EDGE STL BEAM
(E) 3-NAILS
8" MAX
(E) MB
(E) TAB
(E) 2x4 @ 16" OC
(N) BOT PL(2) 10d NAILS
AT EACH HGR
A TYP SOFFIT HANGER EXTENSION
SIDE ELEVATIONBSOFFIT AT DUCT OPENING
FRONT ELEVATION
N
I
R
No. S3866
Exp. 3/31/26
G
T
R
E
TATSS
E OFILACFO
UCTURA
R
L
R
STERED P L
OFESSIONA
N
E
R
AI
E
ENGI
WILLI
H.THORP
................
.
.
.
...............................
.
.
.
...............
E
AM
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
BID SET
FINAL PERMIT/CONFORM SET
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
3/16/2026 12:54:46 PM
Autodesk Docs://Santa Ana Library/22575-01 Santa Ana Library_Struct_SR22.rvt
S7.0-2
EQUIPMENT
ANCHORAGE
DETAILS
JO
B
N
U
M
B
E
R
:
2
1
0
0
5
8
8
;
J
O
B
N
A
M
E
:
S
a
n
t
a
A
n
a
L
i
b
r
a
r
y
R
e
no
v
a
t
i
o
n
;
S
H
E
E
T
:
S
7
.
0
-2;
P
D
:
M
J
S
;
P
M
:
E
S
1" = 1'-0"1EQUIPMENT ANCHORAGE -SUPPLY FAN
1" = 1'-0"2TYPICAL BRACED DUCT ANCHORAGE
1" = 1'-0"5TYPICAL PIPE/CONDUIT TRAPEZE ANCHORAGE1" = 1'-0"7TYPICAL DUCT ANCHORAGE
1" = 1'-0"4DUCT RISER SUPPORT AT FLOOR &
ROOF SLAB
1" = 1'-0"8TYPICAL UNBRACED PIPE/CONDUIT TRAPEZE
ANCHORAGE
1 1/2" = 1'-0"9TYPICAL SINGLE-HUNG PIPE/CONDUIT
ANCHORAGE
1 1/2" = 1'-0"3TYPICAL PIPE/ CONDUIT WEIGHT AND MAX
SUPPORT SPACING1 1/2" = 1'-0"6MEP CONN TO ROOF
REV # DESCRIPTION DATE
#2531 RFI 03.16.2026
1 1/2" = 1'-0"10LOWER (E) SOFFIT AT DUCT OPENING
#2531
.
.
1. ALL FIXTURES SHALL HAVE APPROPRIATE U.L. LABEL, DAMP, OR WET AS
REQUIRED BY LOCAL CODES.
2. ALL FIXTURES SHALL INCLUDE ALL ACCESSORIES FOR INSTALLATION
ACCORDING TO ALL CALIFORNIA ELECTRICAL CODES.
3. PRIOR TO ORDERING ANY LIGHTING EQUIPMENT, THE CONTRACTOR SHALL
VERIFY ALL LOCATIONS AND RECESS DEPTHS.
4. ALL LAMPS SHALL BE INSTALLED ACCORDING TO THE ATTACHED FIXTURE
SCHEDULE.
5. CONTRACTOR SHALL VERIFY FINAL VOLTAGES AND CEILING TRIM
COMPATIBILITY PRIOR TO ORDERING FIXTURES.
6. CEILING THICKNESS IN EXCESS OF 3/4" SHALL BE IDENTIFIED IN WRITING BY
CONTRACT.
7. PROVIDE APPROVED FIRE-RATED ENCLOSURES FOR ALL LIGHTING
FIXTURES LOCATED IN A FIRE-RATED CEILING.
8. WALLS DIRECTLY ILLUMINATED SHALL BE INSTALLED AND FINISHED IN A
MANNER TO ELIMINATE SHADOWS OR BLEMISHES (I.E. HANG DRY WALL
VERTICALLY).
9. ANY FIXTURE SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT AND
OWNER'S REPRESENTATIVE PRIOR TO BID. CONTRACTOR MUST BE
PREPARED TO SUPPLY A SAMPLE AND/OR PHOTOMETRIC DATA IF
REQUESTED.
10. OUTDOOR LIGHTING FIXTURES THAT ARE USED TO ILLUMINATE A
PREMISES, ARCHITECTURAL FEATURE OR LANDSCAPE FEATURE ON
PRIVATE PROPERTY SHALL BE DIRECTED, SHIELDED, OR LOCATED IN SUCH A
MANNER THAT THE LIGHT SOURCE IS NOT VISIBLE OFFSITE, TO MINIMIZE
LIGHT EMISSION ABOVE THE HORIZONTAL PLANE AND SO THAT LIGHT DOES
NOT FALL ONTO SURROUNDING PROPERTIES OR CREATE GLARE HAZARDS
WITHIN PUBLIC RIGHTS-OF-WAY.
11. ALL EMERGENCY BATTERY PACKS SHALL BE FURNISHED WITH 90-MIN
MINIMUM BACK UP CAPABILITY AND PROVIDE NO LESS THAN 1/3 OF THE FULL
LUMEN OUTPUT OF ANY INDIVIDUAL LAMP. LED LIT, TEST SWITCHES TO BE
INTEGRAL TO FIXTURE, NOT REMOTE MOUNTED. CONTRACTOR SHALL
ENSURE THAT A MINIMUM OF 1-FOOTCANDLE IS PROVIDED AT FLOOR LEVEL
ALONG PATH OF EGRESS.
12. LIGHTING INSTALLED IN CORRIDORS AND STAIRWELLS SHALL BE
CONTROLLED BY OCCUPANT SENSING CONTROLS THAT SEPARATELY
REDUCE THE LIGHTING POWER BY AT LEAST 50% WHEN THE SPACE IS
UNOCCUPIED.
13. LIGHTING CONTROL DEVICES AND SYSTEMS, BALLASTS AND LUMINARIES
SHALL COMPLY TO 2022 CENC, SECTION 110.9.
14. SHADED FIXTURE INDICATES EGRESS FIXTURE WITH 90 MIN. BATTERY
BACKUP OR CONNECTED TO BUILDING LIGHTING INVERTER.
15. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED. (CBC
1013.3)
16. ELECTRICALLY POWERED EXIT SIGNS SHALL BE LISTED AND LABELED IN
ACCORDANCE WITH UL 924. (CBC SECTION 1013.5
17. THE EMERGENCY POWER SYSTEM SHALL PROVIDE POWER FOR A
DURATION OF NOT LESS THAN 90 MINUTES AND SHALL CONSIST OF
STORAGE BATTERIES, UNIT EQUIPMENT OR AN ON-SITE GENERATOR. THE
INSTALLATION OF THE EMERGENCY POWER SYSTEM SHALL BE IN
ACCORDANCE WITH SECTION 2702.
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E0.1-2
NEW SINGLE
DIAGRAM
GENERAL NOTES
KEY NOTES
1 PROVIDE 36"X36"X24"D NEMA 3R PULLBOX. CONTRACTOR TO PROVIDE
IRRIVERSABLE SPLICE INSIDE NEW NEMA 3R PULLBOX TO EXTEND 480V,
600A, 3-PHASE, 3-WIRE SYSTEM TO NEW "MSA".
2 3000 PSI CONCRETE PAD, MINIMUM THICKNESS OF 4 INCHES OR
THICKNESS AS REQUIRED TO SUPPORT SWITCHBOARD. CONDUIT SLOT
WITHIN PAD SHALL BE PROVIDED TO ACCOMMODATE ALL FEEDERS.
3 PROVIDE BUILDING POWER SYSTEM GROUND BUS BAR, LOCATED
ADJACENT TO MAIN ELECTRICAL EQUIPMENT.
4 PROVIDE 1"C -1# 4/0 TO GROUND RODS.
5 NEW SWITCHBOARD WITH AUXILIARY CONTACT FOR ELEVATOR
SWITCHBOARD.
MS-A
600A, 480V, 3PHASE, 3W, 65kAIC
600A/3P
60A/3P
3P
2
350A/3P
3P
3
XFMR "T1"
225KVA
480V
208Y/120V
DISTRIBUTION BOARD "DB-2"
800A, 208Y/120V, 3PHASE, 4W, 25kAIC
800A/3P
100A/3P
3P
4
F
40A FLA
30HP
70A/3P
3P
6
F
VFD
AHU-B-1
59.1 A = FLA
20A/3P
3P
5
F
VFD
CHWP
1.1
5
15A/3P
3P
9
F
VFD
HWP
1.2
1
SPARE
15A/3P
3P
10 SPARE
15A/3P
3P
15A/3P
3P 3P
SPARE
20A/3P
3P
15
x2 SPACE
30A/3P
3P
16
175A
3P
1
"LBA"
POWER
PNL
175A
3P
2
"LBB"
POWER
PNL
200A
3P
3
"LBL"
LTG
PNL
200A
3P
4
"LBM"
MECH.
PNL
175A
3P
5
"L1A"
POWER
PNL
175A
3P
6
"L1B"
POWER
PNL
100A
3P
7
"L1L"
LTG
PNL
175A
3P
8
"L2A"
POWER
PNL
175A
3P
9
"L2M"
POWER
PNL
100A
3P
10
"L2L"
LTG
PNL
30A
3P
12 SPARE
175A
3P
13 SPARE
175A
3P
14 SPARE
125A
3P
15
x2 SPACE
SPARE
100A
3P
16
SECOND FLOOR
F
VFD
AHU-1_1
6.6A = FLA
FIRST FLOOR
1
600 A
600 A
3P
CLASS L
IN CITY HALL
CITY HALL ELECTRICAL SYSTEM
IN EXISTING LIBRARY
UNDERGROUND VAULT
(E) MAIN SWITCH SERVING
THE LIBRARY LOCATED
IN CITY HALL
(E) 5''C, 6#500MCM & 1 #3/0 GND
(E) (2-SETS)4''C, 3#
500MCM & 1 #3/0 GND
(2-SETS)4''C, 3#500MCM & 1 #3/0 GND
1''C - 1#4/0
GROUND BUS BAR 3
1''C - 1#4/0 CONCRETE ENCASED ELECTRODE (UFER GROUND)
1''C - 1#4/0 TO MAIN COLD WATER PIPE
4
BASEMENT FLOOR
5 ELEV.
CONT
1''C - 1#3/0 GND
SPD
6 PROVIDE ARC FLASH AND COORDINATION STUDY.
6
6
7 SURGE PROTECTION. TVSS SHALL BE TYPE 1.
7
8 PROVIDE FULL FUNCTION ELECTRONIC TRIP, 100% RATED CIRCUIT
BREAKER WITH RMS SENSING. FIELD REPLACEABLE ELECTRONIC TRIP
WITH COMMUNICATION PORT, AND THE FOLLOWING FIELD ADJUSTABLE
SETTINGS:
a) LONG AND SHORT TIME PICKUP LEVELS.
b) LONG AND SHORT TIME ADJUSTMENTS.
8
8
70A/3P
3P
F
34 FLA
25HP
(E) ELEV.
CONT
(E)
00
0
00
1
00
2
00
3
00
4
00
5
00
8
01
0
01
1
01
2
01
3
01
4
01
5
01
6
01
7
01
8
01
9
02
0
02
1
9 CONTRACTOR SHALL CHANGE CIRCUITING ON ELEVATOR CONTROLLER
FROM 240V, 3-PHASE TO 480V, 3-PHASE. IF ELEVATOR CONTRACTOR
DEEMS THIS NOT POSSIBLE ELECTRICAL CONTRACTOR SHALL PROVIDE
STEP-DOWN TRANSFORMER FOR ELEVATOR. COORDINATE EXACT
LOCATION AND SIZE OF STEP-DOWN TRANSFORMER IN THE FIELD WITH
ELEVATOR CONTRACTOR.
10 PROVIDE NEW 100AS/50AF 480V, 3-PHASE + GROUND FUSED DISCONNECT
SWITCH TO CONNECT EXISTING ELEVATOR CONTROLLER
11 PROVIDE PANELBOARD WITH PROVISION FOR FUTURE CIRCUIT BREAKER
MONITORING.
11
11
LSI
(N) PULLBOX 1
(E)
10
9
ELEV #2 ELEV #1
L=
1
0
5
'
;
V
d
=
0
.
3
0
%
L=400' ; Vd=0.78%
L=
5
'
;
V
d
=
0
.
0
1
%
L=
3
5
'
;
V
d
=
0
.
0
8
%
L=
6
0
'
;
V
d
=
0
.
2
5
%
L=
6
0
'
;
V
d
=
0
.
0
3
%
L=
6
0
'
;
V
d
=
0
.
0
1
%
L=
1
1
5
'
;
V
d
=
0
.
2
7
%
L=
1
2
0
'
;
V
d
=
0
.
0
6
%
L=
2
5
'
;
V
d
=
0
.
1
0
%
L=
3
5
'
;
V
d
=
0
.
2
7
%
L=
4
0
'
;
V
d
=
0
.
1
5
%
L=
4
5
'
;
V
d
=
0
.
1
4
%
L=
6
0
'
;
V
d
=
0
.
1
4
%
L=
3
0
'
;
V
d
=
0
.
1
1
%
L=
1
1
0
'
;
V
d
=
0
.
4
0
%
L=
1
2
0
'
;
V
d
=
0
.
3
8
%
L=
1
3
0
'
;
V
d
=
0
.
6
8
%
L=
1
3
0
'
;
V
d
=
0
.
6
8
%
L=
1
3
0
'
;
V
d
=
0
.
8
2
%
SPARE
20A/3
3P
7
F
VFD
CHWP
1.2
5
L=
6
0
'
;
V
d
=
0
.
0
3
%
15A/3P
3P
8
F
VFD
HWP
1.1
1
00
7
L=
6
0
'
;
V
d
=
0
.
0
1
%
11 13 1412
00
6
00
9
DRAWING LEGEND
EXISTING TO REMAIN
NEW SCOPE OF WORK
12 NO WORK TO BE COMPLETED IN THE CITY HALL. CITY HALL IS FOR THE
CONTRACTOR TO SAFE OFF/LOCK-OFF/TAG-OFF THE ELECTRICAL
SERVICE TO THE LIBRARY.
12
INV-1 (LP)
LTG
PNL
13 PROVIDE MYERS 7.5kVA EMERGENCY POWER SYSTEMS ILLUMINATOR IE
EMERGENCY LIGHTING INVERTER SYSTEM, 208 -120V WITH 90 MIN
BATTERY BACKUP: 3-I-07-S-BA2015-S-T-Z-BAC-2YWT.
13
INV-2
13
1"C - 1#4/0 TO TELECOM GROUND BUS BAR IN FIRST FLOOR IT ROOM
00
REV # DESCRIPTION DATE
#99 RFI 03.21.2025
#187 RFI 12.15.2025
#353 RFI 02.11.2026
#381 RFI 02.03.2026
#391 RFI 02.25.2026
25A/3P
02
3
L=
8
5
'
;
V
d
=
0
.
0
6
%
F
CU-B1-1
7.9A = FLA
14
14 PROVIDE NEW NEMA 3R, 30AS/20AF 480V, 3-PHASE + GROUND FUSED
DISCONNECT SWITCH TO SERVE NEW EXTERIOR CONDENSING UNIT.
ST
15 PROVIDE DEDICATED CIRCUIT BREAKER WITH NORMALLY OPEN
AUXILIARY CONTACT(S) FOR INTERLOCKING WITH THE ELEVATOR
CONTROLLER TO PERFORM REQUIRED ELEVATOR SHUTDOWN.
COORDINATE CONTACT RATINGS, CONTROL VOLTAGE, AND SIGNAL
TERMINATION WITH ELEVATOR CONTRACTOR AND AUTHORITY HAVING
JURISDICTION.
15
ST
15
16 PROVIDE NEW 30AS/25AF 480V, 3-PHASE + GROUND FUSED, DISCONNECT
SWITCH TO SERVE NEW INTERIOR FAN COIL UNIT.
F
FCU-B1-1
16.67A=FLA
1
L=
4
0
'
;
V
d
=
0
.
0
1
%
02
4
16
XFMR "T-ELEV"
45KVA/3PH
480V
240V
3/4"C -
1#6 GND
02
5
#391
RFI
#391
RFI
#391
RFI
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E0.1-3
FEEDER
SCHEDULE
REV # DESCRIPTION DATE
#69 RFI 02.11.2025
#71 RFI 02.11.2025
#72 RFI 02.11.2025
#187 RFI 12.15.2025
#381 RFI 02.03.2026
#391 RFI 02.25.2026
#391
RFI
#391
RFI
1. A NEW TYPED PANELBOARD DIRECTORY CARD SHALL BE PROVIDED FOR ALL
PANELS UNDER THIS CONTRACT. NEW DIRECTORY CARDS SHALL BE LOCATED
ON THE INSIDE DOOR OF ASSOCIATED PANELS.
2. ALL NEW CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE AND SHALL BE
SUITABLE FOR 75 DEGREES AMPACITY CONDUCTORS.
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E0.1-5
PANEL SCHEDULES
REV # DESCRIPTION DATE
#008 ASI 04.11.2025
#020 ASI 03.21.2025
#164 RFI 05.02.2025
#009 ASI 06.04.2025
#027 ASI 08.18.2025
#009.2 ASI 09.30.2025
#009.4 ASI 11.14.2025
#353 RFI 02.11.2026
#388 RFI 02.25.2026
#388
RFI
#388
RFI
#388
RFI
1. A NEW TYPED PANELBOARD DIRECTORY CARD SHALL BE PROVIDED FOR ALL
PANELS UNDER THIS CONTRACT. NEW DIRECTORY CARDS SHALL BE LOCATED
ON THE INSIDE DOOR OF ASSOCIATED PANELS.
2. ALL NEW CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE AND SHALL BE
SUITABLE FOR 75 DEGREES AMPACITY CONDUCTORS.
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E0.1-6
PANEL SCHEDULES
REV # DESCRIPTION DATE
#003 ASI 11.27.2024
#008 ASI 04.11.2025
#141 RFI 04.21.2025
#009.1 ASI 07.16.2025
#031 ASI 10.23.2025
#353 RFI 02.11.2026
#388 RFI 02.25.2026
#388
RFI
#388
RFI
#388
RFI
#388
RFI
#388
RFI
#388
RFI
#388
RFI
#388
RFI
1. A NEW TYPED PANELBOARD DIRECTORY CARD SHALL BE PROVIDED FOR ALL
PANELS UNDER THIS CONTRACT. NEW DIRECTORY CARDS SHALL BE LOCATED
ON THE INSIDE DOOR OF ASSOCIATED PANELS.
2. ALL NEW CIRCUIT BREAKERS SHALL BE BOLT-ON TYPE AND SHALL BE
SUITABLE FOR 75 DEGREES AMPACITY CONDUCTORS.
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E0.1-7
PANEL SCHEDULES
REV # DESCRIPTION DATE
#020 ASI 03.21.2025
#353 RFI 02.11.2026
#353
RFI
#353
RFI
1. ALL FIXTURES SHALL HAVE APPROPRIATE U.L. LABEL, DAMP, OR WET AS
REQUIRED BY LOCAL CODES.
2. ALL FIXTURES SHALL INCLUDE ALL ACCESSORIES FOR INSTALLATION
ACCORDING TO ALL CALIFORNIA ELECTRICAL CODES.
3. PRIOR TO ORDERING ANY LIGHTING EQUIPMENT, THE CONTRACTOR SHALL
VERIFY ALL LOCATIONS AND RECESS DEPTHS.
4. ALL LAMPS SHALL BE INSTALLED ACCORDING TO THE ATTACHED FIXTURE
SCHEDULE.
5. CONTRACTOR SHALL VERIFY FINAL VOLTAGES AND CEILING TRIM
COMPATIBILITY PRIOR TO ORDERING FIXTURES.
6. CEILING THICKNESS IN EXCESS OF 3/4" SHALL BE IDENTIFIED IN WRITING BY
CONTRACT.
7. PROVIDE APPROVED FIRE-RATED ENCLOSURES FOR ALL LIGHTING
FIXTURES LOCATED IN A FIRE-RATED CEILING.
8. WALLS DIRECTLY ILLUMINATED SHALL BE INSTALLED AND FINISHED IN A
MANNER TO ELIMINATE SHADOWS OR BLEMISHES (I.E. HANG DRY WALL
VERTICALLY).
9. ANY FIXTURE SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT AND
OWNER'S REPRESENTATIVE PRIOR TO BID. CONTRACTOR MUST BE
PREPARED TO SUPPLY A SAMPLE AND/OR PHOTOMETRIC DATA IF
REQUESTED.
10. OUTDOOR LIGHTING FIXTURES THAT ARE USED TO ILLUMINATE A
PREMISES, ARCHITECTURAL FEATURE OR LANDSCAPE FEATURE ON
PRIVATE PROPERTY SHALL BE DIRECTED, SHIELDED, OR LOCATED IN SUCH A
MANNER THAT THE LIGHT SOURCE IS NOT VISIBLE OFFSITE, TO MINIMIZE
LIGHT EMISSION ABOVE THE HORIZONTAL PLANE AND SO THAT LIGHT DOES
NOT FALL ONTO SURROUNDING PROPERTIES OR CREATE GLARE HAZARDS
WITHIN PUBLIC RIGHTS-OF-WAY.
11. ALL EMERGENCY BATTERY PACKS SHALL BE FURNISHED WITH 90-MIN
MINIMUM BACK UP CAPABILITY AND PROVIDE NO LESS THAN 1/3 OF THE FULL
LUMEN OUTPUT OF ANY INDIVIDUAL LAMP. LED LIT, TEST SWITCHES TO BE
INTEGRAL TO FIXTURE, NOT REMOTE MOUNTED. CONTRACTOR SHALL
ENSURE THAT A MINIMUM OF 1-FOOTCANDLE IS PROVIDED AT FLOOR LEVEL
ALONG PATH OF EGRESS.
12. LIGHTING INSTALLED IN CORRIDORS AND STAIRWELLS SHALL BE
CONTROLLED BY OCCUPANT SENSING CONTROLS THAT SEPARATELY
REDUCE THE LIGHTING POWER BY AT LEAST 50% WHEN THE SPACE IS
UNOCCUPIED.
13. LIGHTING CONTROL DEVICES AND SYSTEMS, BALLASTS AND LUMINARIES
SHALL COMPLY TO 2022 CENC, SECTION 110.9.
14. SHADED FIXTURE INDICATES EGRESS FIXTURE WITH 90 MIN. BATTERY
BACKUP OR CONNECTED TO BUILDING LIGHTING INVERTER.
15. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED. (CBC
1013.3)
16. ELECTRICALLY POWERED EXIT SIGNS SHALL BE LISTED AND LABELED IN
ACCORDANCE WITH UL 924. (CBC SECTION 1013.5
17. THE EMERGENCY POWER SYSTEM SHALL PROVIDE POWER FOR A
DURATION OF NOT LESS THAN 90 MINUTES AND SHALL CONSIST OF
STORAGE BATTERIES, UNIT EQUIPMENT OR AN ON-SITE GENERATOR. THE
INSTALLATION OF THE EMERGENCY POWER SYSTEM SHALL BE IN
ACCORDANCE WITH SECTION 2702.
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E0.2-1
LIGHTING FIXTURE
SCHEDULES
GENERAL NOTES
REV # DESCRIPTION DATE
#005 ASI 11.27.2024
#184 RFI 05.19.2025
#024 ASI 10.10.2025
#332 RFI 12.05.2025
#370 RFI 02.02.2026
#390 RFI 03.09.2026
#390
RFI
J
111
1
3
2
22
WP
WP
LP-17
4
#10
5
WP
37
LBM-37&39&41
3/4", 4#10 & 1#10GND
7 (1) 1"C, 4#10 & 1#10 GND
(POWER)
(1) 1-1/4"C, 8#14 (THWN)
(CONTROLS) LABEL
CONDUCTORS 1 THRU 8
6
(2) 2"C FOR
CONNECTION TO
PUMPS AND CONTROL
SD16
11
#10 1"C, 4#8, 1#10GNDLBB-48
LBB-50,52,54
LBA-38&4038
10
I
U
E
I
H
U
9
AS.O
A
FRAN CN
4 0 8 0
H
I
N
S
L11
AL
E
CR
N D EN VA
,N I N G
CRAE
TCEIT
SC
S
N
N
G R O U P
7
S
5 06
C
0718
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E1.0-1
ELECTRICAL
POWER SITE PLAN
1/16" = 1'-0"1 ELECTRICAL SITE PLAN
GENERAL NOTES
KEY NOTES
1 PROVIDE 13" X 19" HANDHOLE TO TERMINATE NEW CONDUITS WITH PULL
STRINGS FOR FUTURE EV CHARGERS. PROVIDE WITH FLUSH SOLID BOLT
DOWN COVER AND MARKING PLATE "EV CHARGER INFRASTRUCTURE".
1. ALL OUTDOOR EQUIPMENT SHALL BE WEATHERPROOF (NEMA 3R)
ENCLOSURE.
2. ALL OUTDOOR RECEPTACLES SHALL BE PROVIDED AS GFCI, WEATHER
RESSITANT AND WITH WHILE-IN-USE COVERS.
3. ALL RECEPTACLES ON COMMON WALLS SHALL BE SEPARATE BOXES AND
OFFSET MINIMUM 24 INCHES.
4. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED
FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP SYSTEM EQUAL OR
GREATER THAN THE FIRE RATING OF THE WALL.
5. ALL DEVICE HEIGHTS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR TO
ROUGH-IN.
6. EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL
CONFORM TO CEC, ARTICLE 300.22(C).
7. PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN
CIRCUITRY
8. PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT WHERE
OTHERWISE NOTED. HOME RUN CONDUCTORS MAY BE COMBINED INTO
ONE CONDUIT. NO RACEWAY OR CABLE SHALL CONTAIN MORE THAN NINE
(9) CURRENT CARRYING CONDUCTORS.WHERE MULTIPLE CONDUCTORS
IN EXCESS OF THREE (3) ARE INDICATED ON THESE DRAWINGS, THEY
HAVE BEEN DERATED AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS.
9. NO EQUIPMENT, J-BOXES, ETC. REQUIRING ACCESS SHALL BE LOCATED IN
HARD LID CEILING AREAS (UNLESS ACCESS PANEL IS PROVIDED.
COORDINATE WITH ARCHITECT.) RELOCATE ANY EXISTING EQUIPMENT, J-
BOXES, ETC. TO ACCESSIBLE CEILING AREA.
10. ALL DISCONNECT SWITCHES SHALL BE MOUNTED STRUCTURALLY AND
INDEPENDENT OF THE EQUIPMENT THEY ARE SERVING.
11. DISCONNECT SWITCHES SHALL BE MOUNTED ON THE WALL WITHIN
SIGHT OF EQUIPMENT IT SERVES.
12. REFER TO CIVIL DRAWINGS FOR UNDERGROUND UTILITIES.
2 CONTRACTOR SHALL PROVIDE 1-1/4" C TO PANEL LBB IN MAIN
ELECTRICAL ROOM FOR FURTURE EV CHARGER. CONTRACTOR SHALL
INSTALL PULL-STRING FOR CONDUIT RUN. CONTRACTOR SHALL INSTALL
HANDHOLES AS NEEDED FOR COMPLETE ELECTRICAL INSTALLATION.
COORDINATE EXACT ROUTING IN THE FIELD AND REFER TO CIVIL
DRAWINGS FOR EXISTING UTILITY ON SITE.
3 CONTRACTOR SHALL PROVIDE 1-1/2" C TO PANEL LBB IN MAIN
ELECTRICAL ROOM FOR FURTURE EV CHARGER. CONTRACTOR SHALL
INSTALL PULL-STRING FOR CONDUIT RUN. CONTRACTOR SHALL INSTALL
HANDHOLES AS NEEDED FOR COMPLETE ELECTRICAL INSTALLATION.
COORDINATE EXACT ROUTING IN THE FIELD AND REFER TO CIVIL
DRAWINGS FOR EXISTING UTILITY ON SITE.
4 EXISTING POWER CONNECTION SERVING EXISTING TO REMAIN
IRRIGRATION CONTROLLER.
5 PROVIDE 208V 1-PHASE FOR DUPLEX PUMPS AND 120V POWER
CONNECTIONS FOR CONTROLS FOR NEW STORM WATER PUMP SYSTEM
ON SITE. CONTRACTOR SHALL PROVIDE PUMP CONTROLLER WITH
INTEGRAL DISCONNECT AND OVERCURRENT PROTECTION DEVICES FOR
EACH DUPLEX PUMP. COORDINATE EXACT LOCATION OF NEW PUMP
CONTROLLER IN THE FIELD PRIOR TO INSTALLATION.
6 PROVIDE PRECAST 13"X19" JUNCTION BOX, REFER TO SHEET E6.0-4/06
WITH REINFORCED STEEL PLATE TRAFFIC BOLT DOWN COVER AND LABEL
AS ELECTRICAL FOR CONNECTIONS TO DUPLEX STORM WATER PUMPS.
COORDINATE EXACT LOCATION OF NEW JUNCTION BOX IN THE FIELD
PRIOR TO INSTALLATION.
7 EXTEND CONDUITS INTO NEW STORM WATER PUMP VAULT AS SHOWN.
PROVIDE WATERTIGHT MECHANICAL WALL SEALS (LINK-SEAL® OR
APPROVED EQUAL) AT ALL CONDUIT PENETRATIONS. SEAL ALL
RACEWAYS ENTERING THE VAULT FROM UNDERGROUND WITH LISTED
SEALING FITTINGS OR COMPOUNDS TO PREVENT MOISTURE OR VAPOR
MIGRATION IN ACCORDANCE WITH NEC 300.5(G) AND 300.7(A). ALL
CONDUITS, FITTINGS, AND ENCLOSURES WITHIN THE VAULT SHALL BE
LISTED AND RATED FOR WET LOCATIONS, CORROSION RESISTANT, AND
INSTALLED WATERTIGHT.
8 NOT USED
9 NOT USED
10 PROVIDE LEGRAND OUTDOOR POWER DEDESTAL, 2-GANG DEVICE PLATE
WITH HINGED COVER (XPP2G16C-XX, FINISH TO BE DETERMINDED BY
ARCHITECT). PROVIDE WITH TWO WEATHER PROOF GFCI RECEPTACLES.
COORDINATE EXACT LOCATION WITH ARCHITECT ON-SITE.
11 PROVIDE LEGRAND OUTDOOR POWER DEDESTAL, 2-GANG DEVICE PLATE
WITH HINGED COVER (XPP2G16C-XX, FINISH TO BE DETERMINDED BY
ARCHITECT). PROVIDE WITH (1) 14-50 RECEPTACLE AND ONE (1) 5-20
WEATHERPROOF GFCI RECEPTACLE. COORDINATE EXACT LOCATION
WITH ARCHITECT ON-SITE.
REV #DESCRIPTION DATE
#027 ASI 08.18.2025
#009.2 ASI 09.30.2025
#009.4 ASI 11.14.2025
#009.4
ASI
#009.4
ASI
P P P P P P
MCP
FT FT FT FT FT FT
J J J J J
J
J J
J
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
+42"
STAFF
OFFICE
001
MECH
003
FIRE
AL.RM
006
ELEVATOR-ABAN.
007
OFFICE
012
OFFICE
013
STAFF
MEETING
ROOM
014 OFFICE
015
ELEV.
CONTROL
018
OFFICE
017
(E) ELEV.
CONTROL
RM.
005A
+42"
LBA-9,11,13&15 LBA-17,19,21&23
LBA-2,4,6&8
LBA-10,12,14&16 LBA-18,20,22&24
ALL
GENDER
RESTROOM
010
STAFF
BREAK
ROOM
004
MECH-ABAN.
008
1
4
ELECTRICAL
019
33
7
7
13
13
9
27
27
27
25
25
1
E4.0-2
STAFF
OFFICE
001
LBA-1,3,5&7
ARCHIVES
002
OFFICE
016
1 1 1
1 1
LBM
2
STORAGE
005
2
E4.0-1
DB-2
MS-A
TR -T1
LBL
LBB
LBA
004
10
6
(E) ELECTRICAL
VAULT
5
7 7 7
7 7
LP
8
8
8
8
8
8
8
8
2
9
(E) ELEVATOR
HYDRAULIC
PUMP
7
13
FIRE
AL.RM
006
LBA- 10
10
10
10
(E) FA
LBA- 4
9
LBA- 710
LBA-31
LBA-25,27&29
2
2
INV-1
LBA- 2
LBB-9&11&13
LBB-21&23
LBB-17&19
23 25
+42" +42"
1012
LBB-8&10&12
LBB-14&16
16 14
DW
+18"
4
6
LBB-2&4&6
2
12
20
20
18
18
LBB-18&20
LBB-24
LBB-26
LBB-1&3&5
13
5 555
3
3
1111
44
46
44
44
15
STORAGE
023
LBA-42 16
17
17
LBB-21
11
LBB-27
17
19
JANITOR
022
ALL
GENDER
RESTROOM
011
9
+42"
11
11
11
8 RF.
+42"
+42"
+18"
+18"
2
25
34
31
32
LBA-32,34&36
29
36
LBB-29
2
18
LBB-18
LBA-35
LBA-39
29
27
35
35
35
35
18
LBB-22
LBB- 7
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E2.4-1
ELECTRICAL
REMODEL
BASEMENT POWER
PLAN
1/8" = 1'-0"1 ELECTRICAL NEW POWER PLAN BASEMENT
1. ALL RECEPTACLES ON COMMON WALLS SHALL BE SEPARATE BOXES
AND OFFSET MINIMUM 24 INCHES.
2. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE
PROTECTED FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP
SYSTEM EQUAL OR GREATER THAN THE FIRE RATING OF THE WALL.
3. ALL DEVICE HEIGHTS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR
TO ROUGH-IN.
4. EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL
CONFORM TO CEC, ARTICLE 300.22(C).
5. PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN
CIRCUITRY
6. POWER AND DATA CORE AND FACEPLATES TO MATCH COLOR OF
ADJACENT WALL.
7. COORDINATE RECEPTACLE LOCATIONS WITH DATA OUTLET LOCATIONS
AND GANG DEVICES IN BOXES AND COVER PLATES.
8. WHEN EXPOSED CEILINGS OR OPEN GRID CONDITIONS OCCUR, THE
CONTRACTOR SHALL PROVIDE THE FOLLOWING:
7.1 ALL BRANCH CIRCUITS SHALL BE IN EMT CONDUITS.
7.2 ALL BRANCH CIRCUITS SHALL BE ROUTED, NEATLY AND IN
PARALLEL TO STRUCTURES OR DUCT WORK.
7.3 VISUALLY OBJECTIONABLE BRANCH CIRCUITS SHALL BE
REROUTED AT THE REQUEST OF THE ARCHITECT AT NO
ADDITIONAL COST.
9. PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT
WHERE OTHERWISE NOTED. HOME RUN CONDUCTORS MAY BE
COMBINED INTO ONE CONDUIT. NO RACEWAY OR CABLE SHALL
CONTAIN MORE THAN NINE (9) CURRENT CARRYING
CONDUCTORS.WHERE MULTIPLE CONDUCTORS IN EXCESS OF THREE
(3) ARE INDICATED ON THESE DRAWINGS, THEY HAVE BEEN DERATED
AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS.
10. NO EQUIPMENT, J-BOXES, ETC. REQUIRING ACCESS SHALL BE LOCATED
IN HARD LID CEILING AREAS (UNLESS ACCESS PANEL IS PROVIDED.
COORDINATE WITH ARCHITECT.) RELOCATE ANY EXISTING EQUIPMENT,
J-BOXES, ETC. TO ACCESSIBLE CEILING AREA.
11. UNLESS SPECIFICALLY SHOWN AS (E), (R), (ER), (D), EXISTING OR NON-
BOLD, ALL ELECTRICAL DEVICES SHOWN ARE NEW.
12. CONTRACTOR TO PROVIDE 1/2"CONDUIT WITH PULLSTRING TO ALL NEW
THERMOSTAT LOCATIONS. COORDINATE SCOPE OF WORK WITH
MECHANICAL DRAWINGS.
13. FLOOR PENETRATIONS SHALL BE FIELD LOCATED TO MISS
STRUCTURAL FLOOR FRAMING/REINFORCING BELOW, OTHERWISE,
SITE SPECIFIC DETAILS SHALL BE SUBMITTED TO THE CITY FOR
APPROVAL PRIOR TO INSTALLATION. CONTRACTOR SHALL SCAN ALL
LOCATIONS PRIOR TO CORING.
14. CONTRACTOR SHALL PROVIDE PERMANENT MACHINE TYPE LABELS ON
ALL ELECTRICAL EQUIPMENT, RECEPTACLES AND SWITCHES.
15. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH DECORA
PLATES.
16. CONTRACTOR TO PROVIDE PERMANENT TYPED LABELS ON ALL
EXISTING VAV BOXES DISCONNECT SWITCHES. CONTRACTOR TO
REFER TO MECHANICAL DRAWING FOR NUMBER OF VAV BOXES AND
LOCATIONS.
17. ALL LOW VOLTAGE DEVICES ARE SHOWN FOR REFERENCE ONLY.
18. ALL RECEPTACLES SHALL BE PROVIDED AS TAMPER RESISTANT
RECEPTACLES.
3 SAW-CUT EXISTING SLAB TO ALLOW FOR INSTALLATION OF NEW
CONDUIT. WIRE SIZE PER HOMERUN AND ADDITIONAL NOTES.
2 REFER TO TELECOM/AUDIOVISUAL DRAWINGS FOR FLOOR BOX MAKE
AND MODEL. FLOOR BOX PROVIDED BY TELECOM OR AUDIOVISUAL
CONTRACTOR, COORDINATE IN THE FIELD. CONTRACTOR TO PROVIDE
RECEPTACLE CONFIGURATION AND CIRCUITING AS SHOWN ON THE
DRAWINGS.
1 CONTRACTOR TO PROVIDE WALL FURNITURE BOX. INSTALL FLEX
CONDUIT AS NEED TO CONNECT TO FURNITURE SYSTEM. PROVIDE 3/4''C.,
4#10 + 2#10(N), 1#10 EQUIPMENT GROUND FOR ALL FURNITURE FEED
CONNECTIONS. TIE EQUIPMENT GROUND AND ISOLATED GROUND
CONNECTIONS INTO SINGLE POINT ON FURNITURE FEED WHIP. PROVIDE
HANDLE-TIE ON CIRCUIT BREAKERS AS NEEDED. COORDINATE EXACT
SIZE AND LOCATION IN THE FEILD WITH THE OWNER'S REPRESENTATIVE.
GENERAL NOTES
KEY NOTES
4 PROVIDE GFCI RECEPTACLE IN ELEVATOR PIT.
5 CONTRACTOR TO REUSE EXISITNG DISCONNECT SERVING LIGHTING
INSIDE ELEVATOR CAB. PROVIDE NEW POWER CONNECTION TO EXISTING
DISCONNECT SWITCH.
6 CONTRACTOR TO PROVIDE NEW DISCONNECT SWITCH PER SINGLE LINE
DIAGRAM SHEET E0.1-2 FOR EXISTING ELEVATOR.
7 THE LAST CIRCUIT IN THE FURNITURE FEED SHALL BE CONTROLLED BY
OCCUPANY SENSOR TO COMPLY WITH THE TITLE 24 CONTROLLED
RECEPTACLE CODE REQUIREDMENT, §130.5(d).
8 PROVIDE RECEPTACLE AND CONDUIT SURFACE MOUNTED. CONTRACTOR
SHALL INSTALL CONDUIT IN BASEMENT (LEVEL BELOW) AND ROUTE
CONDUIT SURFACE MOUNTED UP TO NEW SURFACE MOUNTED
RECEPTACLE.
9 PROVIDE POWER CONNECTION TO TWO-WAY COMMUNICATION SYSTEM.
REFER TO SHEET TN-7.0-3 FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
10 EXISTING FIRE ALARM PANEL TO BE REUSED. CONTRACTOR SHALL
DESIGN-BUILD A COMPLIANT FIRE ALARM SYSTEM PER SPECIFICATIONS
SECTION 28 3100.
11 PROVIDE RECEPTACLE AND 120V POWER CONNECTION TO SERVE
FAUCET AND SOAP DISPENSER. PROVIDE RECEPTACLE AND 120V POWER
CONNECTION TO SERVE HAND DRYER MOTOR. ELECTRICAL BOXES NEED
TO BE VERTICALLY, FLUSH MOUNTED TO BACKING MATERIAL, TO ALLOW
PLUMBING AND COMPONENT CLEARANCE. COORDINATE EXACT LOCATION
AND REQUIREMENTS IN THE FIELD.
12 PROVIDE SWITCH ABOVE COUNTER AND CONNECT TO RECEPTACLE TO
SERVE GARBAGE DISCPOSAL. COORDINATE EXACT REQUIREMENTS AND
LOCATIONS IN THE FIELD.
13 REFER TO TELECOM/AUDIOVISUAL DRAWINGS SHEET TA9.1-2 FOR TV
WALL MOUNT BOX FOR MAKE AND MODEL. WALL BOX PROVIDED BY
TELECOM OR AUDIOVISUAL CONTRACTOR, COORDINATE IN THE FIELD.
CONTRACTOR TO PROVIDE RECEPTACLE CONFIGURATION AND
CIRCUITING AS SHOWN ON THE DRAWINGS.
14 PROVIDE POWER CONNECTION TO DRINKNG FOUNTAIN. COORDINATE
EXACT LOCATION AND REQUIREMENTS IN THE FIELD.
15 DEDICATED QUAD RECEPTACLE FOR POWER CONNECTION TO AV RACK.
COORDINATE EXACT LOCATION IN THE FIELD.
16 CONTRACTOR TO PROVIDE MOTOR RATED SWITCH AND POWER
CONNECTION TO SMOKE CURTAIN. PROVIDE FIRE ALARM CONNECTION
AND COORDINATE WITH FIRE ALARM DESIGN-BUILD CONTRACTOR.
COORDINATE EXACT REQIREMENTS AND LOCATION IN THE FIELD.
17 CONNECT TO UNDERCABINET LIGHTING AS SHOWN ON E3.0-1.
REV # DESCRIPTION DATE
#008 ASI 04.11.2025
#020 ASI 03.21.2025
#164 RFI 05.02.2025
#184 RFI 05.19.2025
#009 ASI 06.04.2025
#342 RFI 12.17.2025
#353 RFI 02.11.2026
#036 ASI 01.26.2021
18 REPLACE EXISTING RECEPTACLE WITH GFCI RECEPTACLE.
#353
RFI
#353
RFI
#353
RFI
2T
2T
FT
FT
J
J
J
J J J
ELECTRICAL
J
J J J
J
J
J
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
STUDY
202
VESTIBULE
SEATING
200A
HISTORY
222
STAFF
RESTROOM
2T3
ALL
GENDER
RESTROOM
2T2
YOUNG
ADULT
211
MAKER
STORAGE
216
STUDY
201
+42"
+60"
+42"
+42"
+42"
YA STUDY
BOOTH
211A
54''
5
5
3
+42"+42"
STAFF
MEETING
ROOM
221
OFFICE
223
STAFF
OFFICE
224
OFFICE
226
OFFICE
225
1
L2M
L2AL2L
JAN.RM
217
2
2
2
1
1 1
1
3
(E) SMR ON
RAILING
DOWN TO
BELOW
L2A-16,18,&206
ELEC. RM.
218
INV-2
DDC
3
VIDEO
EDITING
BOOTH
213
STUDY
220
ALL
GENDER
RESTROOM
2T1 STORAGE
200B
1
1
L2L-40,42
5
46
46
42
2
42
42
44
44
#10
L2A-1&3
5
5 7
7
7
L2A-5&7 3
1
L2A-9&11&13
#10
9
9
9
11
11
11
13
13
13 13
1
#10
#10
#10
#10
L2A-15&17
15
15
15
17
5
L2A-33
33
33
33
33 L2A-25,27
L2A-61
&63
L2A-35
5
35
35
35
35
31
L2A-31
33
L2A-19&21
31 31 31
4
L2A-39&41 39
41
37
37
37
L2A-37
10
2
2
2
L2A-2
2
2
4
4
4
L2A-4
L2A-53
7
2
1
22
L2A-32 32 32
32
32
5
6
8
8
L2A-6&8&10
3
10
2
10
10
MAKER
SPACE
212
18 18
18
20
18 20
22
22
22
20
L2A-18&20&22
VIDEO
RECORDING
BOOTH
214
24&26
24
L2A-24&26
L2A-28&30
28&30
28
3D PRINTER
L2A-12&
14&16
12
12
14
16
2
2
44
L2A-48,50
9
L2A-38&40
38
38
40
38
L2A-34&36
8
46
46
L2A-42&44&46
11
28&30
24&26
L2A-72
12
12
7
17
17
235
2
L2A-55
555555 2 2
41 41
28&30
24&26
46
L2A-234
L2A-29
4
4
L2A-59
4
4
12
40
8
44
13
13
L2A-52
13 L2A-52
13
L2A-52
2
2
<unnamed>
L2A-54
L2A-54
13
13
13
13
13
13
13
13
L2A-56
14
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E2.4-3
ELECTRICAL
REMODEL SECOND
FLOOR POWER
PLAN
1/8" = 1'-0"1 ELECTRICAL NEW POWER PLAN - SECOND FLOOR
1. ALL RECEPTACLES ON COMMON WALLS SHALL BE SEPARATE BOXES
AND OFFSET MINIMUM 24 INCHES.
2. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE
PROTECTED FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP
SYSTEM EQUAL OR GREATER THAN THE FIRE RATING OF THE WALL.
3. ALL DEVICE HEIGHTS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR
TO ROUGH-IN.
4. EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL
CONFORM TO CEC, ARTICLE 300.22(C).
5. PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN
CIRCUITRY
6. POWER AND DATA CORE AND FACEPLATES TO MATCH COLOR OF
ADJACENT WALL.
7. COORDINATE RECEPTACLE LOCATIONS WITH DATA OUTLET LOCATIONS
AND GANG DEVICES IN BOXES AND COVER PLATES.
8. WHEN EXPOSED CEILINGS OR OPEN GRID CONDITIONS OCCUR, THE
CONTRACTOR SHALL PROVIDE THE FOLLOWING:
7.1 ALL BRANCH CIRCUITS SHALL BE IN EMT CONDUITS.
7.2 ALL BRANCH CIRCUITS SHALL BE ROUTED, NEATLY AND IN
PARALLEL TO STRUCTURES OR DUCT WORK.
7.3 VISUALLY OBJECTIONABLE BRANCH CIRCUITS SHALL BE
REROUTED AT THE REQUEST OF THE ARCHITECT AT NO
ADDITIONAL COST.
9. PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT
WHERE OTHERWISE NOTED. HOME RUN CONDUCTORS MAY BE
COMBINED INTO ONE CONDUIT. NO RACEWAY OR CABLE SHALL
CONTAIN MORE THAN NINE (9) CURRENT CARRYING
CONDUCTORS.WHERE MULTIPLE CONDUCTORS IN EXCESS OF THREE
(3) ARE INDICATED ON THESE DRAWINGS, THEY HAVE BEEN DERATED
AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS.
10. NO EQUIPMENT, J-BOXES, ETC. REQUIRING ACCESS SHALL BE LOCATED
IN HARD LID CEILING AREAS (UNLESS ACCESS PANEL IS PROVIDED.
COORDINATE WITH ARCHITECT.) RELOCATE ANY EXISTING EQUIPMENT,
J-BOXES, ETC. TO ACCESSIBLE CEILING AREA.
11. UNLESS SPECIFICALLY SHOWN AS (E), (R), (ER), (D), EXISTING OR NON-
BOLD, ALL ELECTRICAL DEVICES SHOWN ARE NEW.
12. CONTRACTOR TO PROVIDE 1/2"CONDUIT WITH PULLSTRING TO ALL NEW
THERMOSTAT LOCATIONS. COORDINATE SCOPE OF WORK WITH
MECHANICAL DRAWINGS.
13. FLOOR PENETRATIONS SHALL BE FIELD LOCATED TO MISS
STRUCTURAL FLOOR FRAMING/REINFORCING BELOW, OTHERWISE,
SITE SPECIFIC DETAILS SHALL BE SUBMITTED TO THE CITY FOR
APPROVAL PRIOR TO INSTALLATION. CONTRACTOR SHALL SCAN ALL
LOCATIONS PRIOR TO CORING.
14. CONTRACTOR SHALL PROVIDE PERMANENT MACHINE TYPE LABELS ON
ALL ELECTRICAL EQUIPMENT, RECEPTACLES AND SWITCHES.
15. ALL RECEPTACLES AND SWITCHES SHALL BE PROVIDED WITH DECORA
PLATES.
16. CONTRACTOR TO PROVIDE PERMANENT TYPED LABELS ON ALL
EXISTING VAV BOXES DISCONNECT SWITCHES. CONTRACTOR TO
REFER TO MECHANICAL DRAWING FOR NUMBER OF VAV BOXES AND
LOCATIONS.
17. ALL LOW VOLTAGE DEVICES ARE SHOWN FOR REFERENCE ONLY.
18. ALL RECEPTACLES SHALL BE PROVIDED AS TAMPER RESISTANT
RECEPTACLES.
4 PROVIDE RECEPTACLE AND 120V POWER CONNECTION TO SERVE
FAUCET AND SOAP DISPENSER. PROVIDE RECEPTACLE AND 120V POWER
CONNECTION TO SERVE HAND DRYER MOTOR. ELECTRICAL BOXES NEED
TO BE VERTICALLY, FLUSH MOUNTED TO BACKING MATERIAL, TO ALLOW
PLUMBING AND COMPONENT CLEARANCE. COORDINATE EXACT LOCATION
AND REQUIREMENTS IN THE FIELD.
3 PROVIDE POWER CONNECTION TO DRINKNG FOUNTAIN. COORDINATE
EXACT LOCATION AND REQUIREMENTS IN THE FIELD.
2 CONTRACTOR TO PROVIDE POKE-THRU BOX, SIMILAR TO TYPE "FP4"
SPECIFIED AND PROVIDED BY TELECOM/AUDIOVISUAL CONTRACTOR, SEE
SHEET TN9.0-7. CONTRACTOR TO PROVIDE RECEPTACLE
CONFIGURATION AND CIRCUITING AS SHOWN ON THE DRAWINGS.
1 REFER TO TELECOM DRAWINGS FOR 2 HOUR FIRE RATED POKE-THRU
BOX MODEL. CONTRACTOR TO PROVIDE RECEPTACLE CONFIGURATION
AS SHOWN ON THE DRAWINGS.
GENERAL NOTES
KEY NOTES
5 REFER TO TELECOM/AUDIOVISUAL DRAWINGS SHEET TA9.1-2 FOR TV
WALL MOUNT BOX FOR MAKE AND MODEL. WALL BOX PROVIDED BY
TELECOM OR AUDIOVISUAL CONTRACTOR, COORDINATE IN THE FIELD.
CONTRACTOR TO PROVIDE RECEPTACLE CONFIGURATION AND
CIRCUITING AS SHOWN ON THE DRAWINGS.
6 CONTRACTOR TO INTERCEPT EXISTING CIRCUITS SERVING EXISTING TO
REMAIN SURFACE MOUNTED RACEWAY LOCATED ON RAILING.
CONTRACTOR SHALL PROVIDE THREE (3) CIRCUITS TO EXISTING
RACEWAY AND RECIRCUIT AND LABEL RECEPTACLES AS NEEDED, FOR A
COMPLETE INSTALLATION FOR EXISTING TO REMAIN
RACEWAY/RECEPTACLE.
7 CONTRACTOR TO INTERCEPT EXISTING CIRCUITS SERVING EXISTING TO
REMAIN RECEPTACLES LOCATED IN MEZZANINE LEVEL ABOVE.
COORDINATE SCOPE OF WORK IN THE FIELD.
8 CONTRACTOR TO PROVIDE MOTOR RATED SWITCH AND POWER
CONNECTION TO PROJECTION SCREEN MOTOR. COORDINATE EXACT
REQIREMENTS AND LOCATION IN THE FIELD.
9 CONTRACTOR TO PROVIDE CEILING MOUNTED RECEPTACLE FOR
PROJECTOR. COORDINATE EXACT REQIREMENTS AND LOCATION IN THE
FIELD.
10 CONTRACTOR TO PROVIDE MOTOR RATED SWITCH AND POWER
CONNECTION TO SMOKE CURTAIN. PROVIDE FIRE ALARM CONNECTION
AND COORDINATE WITH FIRE ALARM DESIGN-BUILD CONTRACTOR.
COORDINATE EXACT REQIREMENTS AND LOCATION IN THE FIELD.
11 CONNECT INVERTER TO PANELBOARD AND CIRCUIT NUMBER AS SHOWN
AND INDICATED USING 1"C, 2#4, 1#10GND.
12 CONNECT TO UNDERCABINET LIGHTING AS SHOWN ON E3.0-3.
REV # DESCRIPTION DATE
#008 ASI 04.11.2025
#020 ASI 03.21.2025
#009.1 ASI 07.16.2025
#031 ASI 10.23.2025
#353 RFI 02.11.2026
#389 RFI 02.27.2026
13 PROVIDE POWER CONNECTION AND MOTOR RATED SWITCH FOR SHADE
MOTOR AND PROVIDE SWITCH FOR CONTROL OF (UP/DOWN) OF NEW
MOTORIZED SHADES, COORDINATE EXACT LOCATION OF DEVICES AND
EXACT REQUIREMENTS IN THE FIELD WITH SHADE VENDOR.
14 PROVIDE NEW GFCI RECEPTACLE IN ELEVATOR OVERHEAD MACHINE
ROOM.
#389
RFI
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
EF
1-2
EF
1-1
CU
IT
CU
ELEV
CU
ELECSF
B1
4
33
2
1
1
F F F
L2M-27,29
L2M-31,33
L2M-35,37
WPWPWPF
L2M-23,25
WP
M
L2M-19&21
M1921WP WP
L2A-54
#10
#10 #10
5
CU
ELEV2 6
F
#10
L2M-35,37
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E2.4-4
ROOF POWER
PLAN
1/8" = 1'-0"1 ELECTRICAL ROOF PLAN
1. ALL RECEPTACLES MOUNTED ON THE ROOF SHALL BE GFCI AND
WEATHER PROOF TYPE.
2. A ELECTRICAL EQUIPMENT MOUNTED OUTDOORS SHALL BE
WEATHERPROOF (NEMA 3R).
3. REFER TO MECHANICAL AND PLUMBING DRAWING FOR CONTROL
WIRING OF ALL HVAC EQUIPMENT PROVIDE ALL CONDUITS, WIRES AND
DEVICES ACCORDINGLY.
4. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE
PROTECTED FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP
SYSTEM EQUAL OR GREATER THAN THE FIRE RATING OF THE WALL.
5. ALL DISCONNECT SWITCHES SHALL BE MOUNTED STRUCTURALLY AND
INDEPENDENT OF THE EQUIPMENT THEY ARE SERVING.
6. DISCONNECT SWITCHES SHALL BE MOUNTED WITHIN SIGHT OF
EQUIPMENT IT SERVES.
7. CONTRACTOR TO REFER TO MECHANICAL DRAWINGS AND PROVIDE
1/2"CONDUIT, WITH PULLSTRING, TO ALL THERMOSTAT LOCATIONS.
COORDINATE SCOPE OF WORK WITH MECHANICAL DRAWINGS.
8. WHEREVER POSSIBLE, RUN CONDUITS SERVING ROOF MOUNTED
RECEPTACLES, DISCONNECT SWITCHES, EQUIPMENT, ETC. BELOW
CEILING SPACE, WHERE AMBIENT TEMPERATURE WILL BE BELOW 30°C.
FINAL CONNECTIONS TO ROOF EQUIPMENT IS LIMITED TO 5'-0" OF
DIRECT SUN EXPOSURE. WHERE CONDUITS CANNOT BE ROUTED IN
CEILING SPACE BELOW, PLACE CONDUITS ON DURA BLOCK SLEEPERS
(48" O.C.) ALONG THE ENTIRE LENGTH OF THE CONDUIT SYSTEM
INSTALLATION.
3 PROVIDE NEMA 3R, WEATHERPROOF, 250V, 3PH, 30AS/30AF FUSED
DISCONNECT TO SERVE OUTDOOR CONDENSING UNIT. PROVIDE 3/4"C,
2#10 & 1#10GND FROM OUTDOOR CONDENSING UNIT TO INDOOR
ASSOCIATED FAN COIL UNIT. COORDINATE EXACT LOCATION AND
REQUIREMENTS IN THE FIELD.
2 PROVIDE NEMA 3R, WEATHERPROOF, 250V, 1PH, 30AS/15AF FUSED
DISCONNECT SWITCH FOR VENTILATION SUPPLY FAN. PROVIDE 3/4"C,
WITH PULL STRING, FROM SUPPLY FAN TO DDC PANEL LOCATED ON
SECOND FLOOR FOR TIMECLOCK CONTROLS. COORDINATE EXACT
LOCATION AND REQUIREMENTS IN THE FIELD.
1 PROVIDE POWER 120V, 1PH POWER CONNECTION FOR 1ST FLOOR
EXHAUST FAN. EXHAUST FAN PROVIDED WITH NEMA 3R TOGGLE SWITCH.
PROVIDE 3/4"C, WITH PULL STRING, FROM EXHAUST FAN TO DDC PANEL
LOCATED ON SECOND FLOOR FOR TIMECLOCK CONTROLS. COORDINATE
EXACT LOCATION AND REQUIREMENTS IN THE FIELD.
GENERAL NOTES
KEY NOTES
4 PROVIDE NEMA 3R, WEATHERPROOF, 250V, 3PH, 30AS/15AF FUSED
DISCONNECT TO SERVE OUTDOOR CONDENSING UNIT. PROVIDE 3/4"C,
2#10 & 1#10GND FROM OUTDOOR CONDENSING UNIT TO INDOOR
ASSOCIATED FAN COIL UNIT. COORDINATE EXACT LOCATION AND
REQUIREMENTS IN THE FIELD.
REV # DESCRIPTION DATE
#187 RFI 12.15.2025
#353 RFI 02.11.2026
5 CONTRACTOR SHALL PROVIDE 3/4"C.O. WITH PULLSTRING FOR
CONNECTION BETWEEN OUTDOOR CONDENSING UNIT AND INDOOR FAN
COIL UNIT. COORDINATE EXACT REQUIREMENTS IN THE FIELD.
023
6 PROVIDE NEMA 3R, WEATHERPROOF, 250V, 3PH, 30AS/25AF FUSED
DISCONNECT TO SERVE OUTDOOR CONDENSING UNIT. PROVIDE 3/4"C,
2#10 & 1#10GND FROM OUTDOOR CONDENSING UNIT TO INDOOR
ASSOCIATED FAN COIL UNIT. COORDINATE EXACT LOCATION AND
REQUIREMENTS IN THE FIELD.
#353
RFI
JJ
T
FC
-B1
-1
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
FC
B3
FC
B4
FC
B5
FC
B6
FC
B7
FC
B8 FC
B9
FC
B10
FC
B2
FC
B11
FC
B1M
LBM- 1
M
LBM- 5
LBM- 7
M M
LBM- 9
M
LBM- 11 LBM- 13
M M M
LBM- 3
M
M
LBM- 19
M
1 1 1
1
1
1
1
1
7
3
LBM- 2
LBM- 4
LBM- 15
LBM
LBA
LBB
LBL
LBM- 6
6
(TYP.)
SE-1
SE-2
2"C.O. FOR
CONTROLS3/4"C, 3#10 &
1#10GND 5
SEWER EJECTOR
CONTROL PANEL
4
2
004
6
EF
B-2
EF
B-1
(TYP 2)
LBM- 38,40,42
LBM- 10
6
FC
ELEV
FC
ELEC
LBM- 8
6
2
2
2 4 4
4
4 6
6
DDC
LBM-14
3/4"C, 3#10 & 1#10GND
LBM-29&31
7
7
LBM-33
6
6
LBM- 17
L2M-20,22,24
M
L2M-26
8
9
HPWH-1
CP-1
006
006
VFDVFD
008
009
VFD
VFD
1
#10
LBM-32,34,36
LBM-21
FC
B1-1
024
2
11
6
FC
ELEV2
7
LBM-10
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E2.5-1
ELECTRICAL
REMODEL
BASEMENT
MECHANICAL
POWER PLAN
1/8" = 1'-0"1 ELECTRICAL REMODEL BASEMENT POWER MECHANICAL PLAN
1. ALL RECEPTACLES ON COMMON WALLS SHALL BE SEPARATE BOXES
AND OFFSET MINIMUM 24 INCHES.
2. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE
PROTECTED FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP
SYSTEM EQUAL OR GREATER THAN THE FIRE RATING OF THE WALL.
3. ALL DEVICE HEIGHTS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR
TO ROUGH-IN.
4. EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL
CONFORM TO CEC, ARTICLE 300.22(C).
5. PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN
CIRCUITRY
6. POWER AND DATA CORE AND FACEPLATES TO MATCH COLOR OF
ADJACENT WALL.
7. WHEN EXPOSED CEILINGS OR OPEN GRID CONDITIONS OCCUR, THE
CONTRACTOR SHALL PROVIDE THE FOLLOWING:
7.1 ALL BRANCH CIRCUITS SHALL BE IN EMT CONDUITS.
7.2 ALL BRANCH CIRCUITS SHALL BE ROUTED, NEATLY AND IN
PARALLEL TO STRUCTURES OR DUCT WORK.
7.3 VISUALLY OBJECTIONABLE BRANCH CIRCUITS SHALL BE
REROUTED AT THE REQUEST OF THE ARCHITECT AT NO ADDITIONAL
COST.
8. PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT
WHERE OTHERWISE NOTED. HOME RUN CONDUCTORS MAY BE
COMBINED INTO ONE CONDUIT. NO RACEWAY OR CABLE SHALL
CONTAIN MORE THAN NINE (9) CURRENT CARRYING
CONDUCTORS.WHERE MULTIPLE CONDUCTORS IN EXCESS OF THREE
(3) ARE INDICATED ON THESE DRAWINGS, THEY HAVE BEEN DERATED
AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS.
9. NO EQUIPMENT, J-BOXES, ETC. REQUIRING ACCESS SHALL BE LOCATED
IN HARD LID CEILING AREAS (UNLESS ACCESS PANEL IS PROVIDED.
COORDINATE WITH ARCHITECT.) RELOCATE ANY EXISTING EQUIPMENT,
J-BOXES, ETC. TO ACCESSIBLE CEILING AREA.
10. UNLESS SPECIFICALLY SHOWN AS (E), (R), (ER), (D), EXISTING OR NON-
BOLD, ALL ELECTRICAL DEVICES SHOWN ARE NEW.
11. CONTRACTOR TO PROVIDE 1/2"CONDUIT WITH PULLSTRING TO ALL NEW
THERMOSTAT LOCATIONS. COORDINATE SCOPE OF WORK WITH
MECHANICAL DRAWINGS.
3 CONTRACTOR TO PROVIDE 120V POWER CONNECTION TO SERVE AHU UV
LIGHTS. COORDINATE EXACT LOCATION OF POWER FEED IN FIELD.
2 CONTRACTOR TO PROVIDE 120V POWER CONNECTION TO SERVE
LIGHTING AND RECEPTACLES INSIDE AHU. COORDINATE EXACT
LOCATION OF NEW POWER FEED IN THE FIELD.
1 CONTRACTOR TO PROVIDE POWER CONNECTION AND MOTOR RATED
SWITCH FOR FAN COIL UNIT. COORDINATE EXACT LOCATION OF SWITCH
IN THE FIELD AND WITH MECHANICAL DRAWING M2.1-1
GENERAL NOTES
KEY NOTES
4 PROVIDE PANELS WITH OVERCURRENT PROTECTION DEVICES FOR NEW
PUMPS. PROVIDE CONTROL PANEL AND EXISTING CONTROLS ARE
EXISTING TO REMAIN.ALARM IS SIREN WITH STROBING LIGHT ON THE
PANEL.
5 PROVIDE 250V, 30AS/10AF, 3-PHASE, 3-WIRE & GND FUSED DISCONNECT
SWITCH TO SERVE SUMP PUMP. LOCATE WITHIN SIGHT OF PUMP.
6 CONTRACTOR TO PROVIDE 120V POWER CONNECTION AND GFCI
RECEPTACLE TO SERVE FAN COIL UNIT CONDENSATE PUMP.
COORDINATE EXACT LOCATION OF NEW RECEPTACLE IN THE FIELD.
7 POWER TO FAN COIL UNIT FROM OUTSIDE, ROOF MOUNTED,
CONDENSING UNIT. CONTRACTOR TO PROVIDE 3/4"C AND CONNECTION
TO ROOF MOUNTED CONDENSING UNIT. COORDINATE SCOPE OF WORK
WITH SHEET E2.4-4.
8 CONTRACTOR TO PROVIDE 30AS/30AF, 250V, 3-PHASE & GROUND
DISCONNECT SWITCH TO SERVE WATER HEATER.
9 CONTRACTOR TO PROVIDE 120V POWER CONNECTION AND MOTOR
RATED SWITCH TO SERVE NEW CIRCULATION PUMP. COORDINATE SCOPE
OF WORK IN THE FIELD AND WITH PLUMBING DETAILS ON SHEET P2.5-1.
10 CONTRACTOR TO PROVIDE 120V POWER CONNECTION AND MOTORATED
SWITCH FOR VAV CONTROLS. EXTEND CIRCUITING TO ALL LOCATIONS IN
THE FIELD AND COORDINATE WITH MECHANICAL DRAWINGS, USING
3/4"C, 2/12 & 1#12GND.
REV # DESCRIPTION DATE
#020 ASI 03.21.2025
#177 RFI 05.21.2025
#353 RFI 02.11.2026
#381 RFI 02.03.2026
#035 ASI 02.05.2026
11 CONTRACTOR SHALL PROVIDE 3/4"C.O. WITH PULLSTRING FOR
CONNECTION BETWEEN OUTDOOR CONDENSING UNIT AND INDOOR FAN
COIL UNIT. COORDINATE EXACT REQUIREMENTS IN THE FIELD.
#353
RFI
FEC
FE
C OS
J
D
D D
D
OSOS
OS OS
OS
OS
OS
OS
D OS
OS
OS
OS
OS
OS
OS
OS
D
OS
OS
O
S
OS OSOS
OS
OS
OS
OS
OS
OSOS
OS
OS
OS
J
OS
OS
OS
OS
J
J
OS
OS
OS
J
J
J
OS
J
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
GREAT
READING
ROOM
101
FAMILY
ZONE
121
MECH.
113
ALL
GENDER
RESTROOM
114
ALL
GENDER
RESTROOM
115
NURSING/SENSORY
116
JAN. RM
112
MEN RR
110
WOMEN
RR
111
FIREPLACE
ROOM
122
STORAGE
108
BOOKSTORE
109
SORTING
123
STAFF
MEN
RESTROOM
105
BOOKMOBILE
ROOM
103
OFFICE
103A
TODDLERS
AND
INFANTS
120
MEETING/COMMUNITY
ROOM
102
VESTIBULE
107
X
X
X
X
X
X
X
X
STAFF-WOMEN
RESTROOM
104
B1B1
A1
A1
A1
A1
B4 B4 B4B4B4B4
STORAGE
124
1(TYP)
6(TYP)
I.T.
106
B1 B1
B1
B1
A1
A1
B3
B3
B3
B3
B3
B3
B3
B3
B1
B3
B3
B3 B3
B3 B3 B3B3
5
B1
B1
VESTIBULE
100
H1
B1 B1 B1
B1B1B1
B1
B1 B1 B1
B1
B1
B1 B1 B1
B1
B1
B1B1
B1B1
X
H1 H2
B1
B1
B1
B1 B1 B1
B1B1
B1 B1
B1
B1
B1B1 B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1
C1A
B1 B1 B1 B1 B1
B1
B1
B1
C1 C1
H1H1
H1 H1 H1
C1
C1
B1 B1B1
B1
B1
C1
B1
G1
G1
G1
C1
B1
B1
B1
B1
B3
B3
B1
B1
a,b
11R6
11R6
EM
EM EM
R5
3R5 3R5
3R5 11R6
EM
EM
3b
9a
9a
9a
aA19aA19a
A1 9a A1
3a
EM
A1
3a
EM
A1
3a
EM
A1
3a
EM
A1
3a
EM
A1
3a
EM
A1
3a
EM
A1 3b
EM
A1
3b
EM
A1 9a
A1 9aA19a
9a A1 9a
A1
A1A1
B1
A1
3a
EM
A1
3a
EM
A1 9a
A1 9a
a
A1A1
A1
A1
A1
A1
A1
A1
9a
9a
9a
b
3b
a,b
b
b
a
B1
9a
EM
EM
9R3
9R3
3R3
3R3
EM
R3
9R3
3R3
EM
3R3 9R3
EM 3R3
R3
EM
EM
EM EM
R2 R3
L1L-9 VIA
LCP-1-R2
9R2
9R29R2
9R2
9R3
3R23R2
3R23R2
a
EM
a
EM EMa
a
5a 5a
a
5a
5a
5a
a
3a3a
3a
3a
3a
EM
EM
EM
3a
L1L-5
9R4 9R4
R4
a
a,b,c
11a
11a 11a
11a11a
11b
11b11b
11b
11b 11b
a,b,c
a,b
a,b
11c
11c
INV-2-3
a,b,c
8
8
8
8
8
c
c
a,b
8
2
a a
a9a
a
4
EM
3a
7a
5
a,b,c
3a 3a 3a
3a3a
3a 3a 3a
3a
3a
3a
3a
3a
3a
3a
3a
3a
3a
3a
11 1
4
(TYP)
a,b,c
1b &
1c
1a 1a 1a
1a 1a 1a
1a
1a
1a
1a
1a
1a 1a
1a
1a
1a
a,b,c
28FT 28FT 28FT
1b &
1c
EM
L1L-1
2b &
2c
INV-2
a,b,c
a2
3d 3d 3d
3d 3d 3d
3d 3d 3d
3d 3d 3d
3d 3d 3d
d,e,f
d,e,f
EM EMEM EM
a a
2a 2a 2a 2a
a
EM
B1
B1
B1
EM
EM
2a
2a
2a
2 2
2
EM
EM
5a
a3R3
5aa
3R3
5a
a
EM 12FT
12FT
2e &
2f
3e &
3f
INV-2
EM3a &
3c
3b &
3c
2b &
2c INV-2
L1L-3
R4
L1L-9 VIA
LCP-1-R3
L1L-9
11a 11a 11a 11a 11a 11a
aaaa
L1L-11
L1L-11 VIA
LCP-1-R6
L1L-11 VIA
LCP-1-R5
11a
2
R3
B3INV-1-6 VIA
ELCP R2
2
2
INV-2-3 VIA
ELCP-1-R3
INV-2-3 VIA
ELCP-1-R2
d,e,f
a,b,c
a
2
TO FIXTURE IN
BASEMENT. REFER
TO SHEET E3.0-1
LOCATED ON LEVEL 1
COORDINATE EXACT
LOCATION IN THE FIELD
2
L1L
a
TO FIXTURE IN
BASEMENT. REFER
TO SHEET E3.0-1
a
7a
7
a
3a
L1L-7 VIA
LCP-1-R1
L1L-29
LCP-1
ELCP-1 INV-2-1 VIA
ELCP-1-R1
G1
G1 G1
EM
INV-2-3 VIA
ELCP-1-R4
3
LBL-15 VIA
LCP R6
10
B211cB2B211c 11c
X
X
4
4
X
4
X
4
X
X
4
X
4
4
X 4
(TYP.)
C1
C1
9R4
9R4
B3
B3
B3
B3 11a
L1A
12
11
11
11
12
11
11
11
11
11
12
12
11
12
11
11
12
EX
EX
EX
EX
EM
EM
EM
7a
7a
1a
1a
1a
TP1
EM EM
EM
1a 1a 1a7a7a7aEXEXEXEXEXEXEX
3a
FIREPLACE
ROOM
122
3
3
1. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND ELEVATION OF
ALL LIGHTING FIXTURES AND ALL LIGHTING CONTROL DEVICES. ALL WALL
MOUNTED DEVICES SHALL BE VERIFIED WITH ARCHITECT PRIOR TO ROUGH-IN.
2. CONTRACTOR SHALL VERIFY CEILING CONSTRUCTION WITH ARCHITECTURAL
PLAN AND PROVIDE LIGHTING FIXTURES WILL ALL NECESSARY MOUNTING
HARDWARE.
3. CONTRACTOR TO REFER TO DRAWING E0.02 FOR FIXTURE SCHEDULE.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING LIGHTING FIXTURES WITH
REQUIRED STRUCTURAL SUPPORTS.
5. REFER TO ARCHITECTURAL PLANS FOR EXIT SIGN CHEVRONS AND NUMBER
OF FACES PER EXIT SIGN. ANY DISCREPANCIES BETWEEN EXIT SIGNS SHOWN
ON ELECTRICAL AND ARCHITECTURAL PLANS SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT.
6. REFER TO DRAWING E3.03 FOR LIGHTING CONTROL DIAGRAMS AND DETAILS.
CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL LOW VOLTAGE WIRING AND
COMPONENTS TO PROVIDE A COMPLIANT AND FULLY WORKING LIGHTING
CONTROL SYSTEM. CONTROLS DIAGRAMS AND DRAWINGS ARE FOR
REFERENCE ONLY AND NOT PRICING AND SHALL NOT BE USE FOR
CONTRUCTION. CONTRACTOR SHALL PROVIDE COMPLETE TITLE 24
COMPLIANT LIGHTING CONTROL SUBMITTAL FOR REVIEW AND APPROVAL.
7. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED
FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP SYSTEM EQUAL OR
GREATER THAN THE FIRE RATING OF THE WALL.
8. SWITCH CORE AND FACEPLATES TO MATCH COLOR OF ADJACENT WALL.
9. CONTRACTOR TO PROVIDE JUNCTION BOXES AS NEEDED FOR A COMPLETE
LIGHTING INSTALLATION. THESE ARE NOT SHOWN FOR CLARITY OF
DRAWINGS. NO JUNCTION BOXES SHALL BE INSTALLED IN HARD-LID CEILINGS.
10. CONTRACTOR TO PROVIDE CONSTANT HOT CIRCUIT TO ALL EXIT SIGNS AND
LIGHT FIXTURES PROVIDED WITH 90 MINUTE BATTERY BACKUP FOR EGRESS.
11. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED
FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP SYSTEM EQUAL OR
GREATER THAN THE FIRE RATING OF THE WALL.
12. EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL
CONFORM TO CEC, ARTICLE 300.22(C).
13. PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN
CIRCUITRY.
14. WHEN EXPOSED CEILINGS OR OPEN GRID CONDITIONS OCCUR, THE
CONTRACTOR SHALL PROVIDE THE FOLLOWING:
14.1 ALL BRANCH CIRCUITS SHALL BE IN EMT CONDUITS
14.2 ALL BRANCH CIRCUITS SHALL BE ROUTED, NEATLY AND IN PARALLEL TO
STRUCTURES OR DUCT WORK.
14.3 VISUALLY OBJECTIONABLE BRANCH CIRCUITS SHALL BE REROUTED AT
THE REQUEST OF THE ARCHITECT AT NO ADDITIONAL COST.
15. PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT WHERE
OTHERWISE NOTED. HOME RUN CONDUCTORS MAY BE COMBINED INTO ONE
CONDUIT. NO RACEWAY OR CABLE SHALL CONTAIN MORE THAN NINE (9)
CURRENT CARRYING CONDUCTORS. WHERE MULTIPLE CONDUCTORS IN
EXCESS OF THREE (3) ARE INDICATED ON THESE DRAWINGS, THEY HAVE
BEEN DERATED AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS.
16. CONTRACTOR SHALL VERIFY WITH LIGHTING CONTROLS MANUFACTURER
THE TYPE QUANTITY AND BEST PLACEMENT OF OCCUPANT AND/OR
PHOTOCELL SENSORS AS SHOWN ON FLOOR PLAN. PER TITLE 24, OCCUPANT
SENSORS SHALL BE MOUNTED AT LEAST 4FT AWAY FROM AIR SUPPLY
REGISTER.
17. CONTRACTOR SHALL PROVIDE STARTUP AND COMMISSIONING SERVICES
FROM LIGHTING CONTROL MANUFACTURER TO SET UP, ADJUST AND
PROGRAM SOFTWARE SYSTEM FOR THE LIGHTING CONTROL SYSTEM TO
PROVIDE A COMPLETE AND OPERABLE SYSTEM.
18. NOT ALL JUNCTION BOXES ARE SHOWN ON DRAWINGS. CONTRACTOR
SHALL PROVIDE FOR A COMPLETE LIGHTING SYSTEM.
19. PROVIDE AN UN-SWITCHED HOT CIRCUIT WIRING TO ALL EMERGENCY LIGHT
FIXTURES AND EXIT SIGNS.
20. CONTRACTOR SHALL INCLUDE IN PRICING, ADDITIONAL 7 EXIT SIGNS,
CONDUIT AND WIRING THAT MIGHT BE INSTALLED DURING INSPECTIONS.
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E3.0-2
ELECTRICAL
REMODEL FIRST
FLOOR LIGHTING
PLAN
1/8" = 1'-0"1 2 - ELECTRICAL RCP PLAN - FIRST FLOOR
1 CONTRACTOR SHALL PROVIDE LIGHT FIXTURE WITH TWO (2) INDIVIDUAL
SWTICHLEGS TO CONTROL UPLIGHT FROM DOWNLIGHT.
2 PROVIDE LINE VOLTAGE OCCUPANCY SENSOR FOR THE AREA.
3 LIGHTING IN THIS AREA SHALL BE CONTROLLED VIA TIMECLOCK
CONTROLS. OVERRIDE SWITCHES AND OCCUPANCY SENSORS SHALL
ONLY WORK DURING OFF HOURS.
4 EXIT SIGNS SHALL BE CONNECTED TO INVERTER PANEL INV-2-14. EXTEND
BRANCH CIRCUIT (CONDUIT AND WIRES (2#10 & 1#10 GND)) TO ALL EXIT
SIGNS.
5 MANUAL OVERRIDE SWITCH FOR GREAT ROOM LIGHTING. SWITCH SHALL
BE IN-ACCESSIBLE DURING NORMAL BUSINESS HOURS.
GENERAL NOTES
KEY NOTES
6 EXISTING EXIT SIGN LOCATION. REMOVE EXISTING EXIT SIGN AND
REPLACE WITH NEW. INTERCEPT EXISTING CONDUIT AND WIRING AND
EXTEND TO NEW EXIT SIGN CIRCUIT AS NOTED IN KEYNOTE 4.
7 CONTRACTOR SHALL PROVIDE PARTITION SENSOR FOR CONTROL OF
LIGHTING. COORDINATE EXACT SCOPE OF WORK IN THE FIELD WITH
PARTITION VENDOR AND LIGHTING CONTOLS VENDOR.
8 CONTRACTOR SHALL PROVIDE SWITCH AND OCCUPANCY SENSORS TO
BE INTERLOCKED WITH PARTITION SENSOR FOR CONTROL OF LIGHTING.
COORDINATE EXACT SCOPE OF WORK IN THE FIELD WITH PARTITION
VENDOR AND LIGHTING CONTROLS VENDOR.
9 CONTRACTOR SHALL NEATLY STORE, PROTECT AND CLEAN EXISTING
LINEAR LED LIGHTING DURING DEMOLITION. CONTRACTOR SHALL
REINSTALL LINEAR LED FIXTURES, IN NEW LOCATION, AS SHOWN AND
INDICATED ON THIS SHEET.
10 PROVIDE A COMLETE LIGHTING CONTROL SYSTEM INCLUDING DEMAND
RESPONSE, TIMECLOCK CONTROLS, ETC. FOR COMPLIANCE WITH TITLE
24.
11 EXIT SIGN SHALL BE CEILING MOUNTED.
12 EXIT SIGN SHALL BE WALL MOUNTED.
REV # DESCRIPTION DATE
#005 ASI 11.27.2024
#191 RFI 05.28.2025
#192 RFI 05.28.2025
#212 RFI 07.09.2025
#281.1 RFI 10.08.2025
#024 ASI 10.10.2025
#332 RFI 12.05.2025
#359 RFI 12.30.2025
#370 RFI 02.02.2026
#390 RFI 03.09.2026
#390
RFI
FE
C
FE
C
FEC
D
OS
OS
OS
OS
D
OS
OS
OS
OS
D
D
J
OS
OS
D
OS
OSOS
D
JJD
D
J
OS
OS
OS
D
J
OS
D
J
OS
J
OS
J
OS
OS
DD
OS
OS
J
OS
J
D
D
D
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
YOUNG
ADULT
211
STUDY
201
?
?
VESTIBULE
SEATING
200A
JAN.RM
217
ALL
GENDER
RESTROOM
2T1
ALL
GENDER
RESTROOM
2T2
STAFF
RESTROOM
2T3
STUDY
220
STAFF
MEETING
ROOM
221
HISTORY
222
STAFF
OFFICE
224
OFFICE
226
OFFICE
225
OFFICE
223
STUDY
202 STORAGE
200B
YA STUDY
BOOTH
211A
MAKER
STORAGE
216
A1
A1
A1
A1
A1A1
A1 A1
A1
X
X
X
X
A1
A1
B1
B1
B1
B1
B1
B1
B1
B1
B1
B1 B1
B1
A1
A1
A1A1
A1
A1 A1
A1
A1A1
A1
A1 A1
A1
B1
B1
B1A1A1
A1
A1
B1
B1B1
A1
A1
A1
A1
A1
A1
A1A1
A1
A1
B1
B1
B1
A1
A1
B1
B1 B1
A1
A1
B1
B1
1(TYP)
A1
A1
A1
c,d
ab
a
a
a
a
a,b,c
a
a
a
a
B1
B1
B1
B1
B1B1B1
ADULT
STACKS
200
EM
5
B1B1
A1
A1
A1
A1
A1
A1
B1
B1
B1
B1
B1
B1 B1
B1 B1
B1
B1B1
B1 B1
C1
A1
B1
B1
ELEC. RM.
218 VIDEO
EDITING
BOOTH
213
X
ER
ER
ER
ER
A1
A1
A1 A1
C1
A1
A1A1
A1
A1 A1
B1
B1
B1
B1
B1
B1
B1
B1
2a
a,b
2a
a,b
2a
2a
a,b
a,b2a
2a
2a
2a
A1
c,d
7c 2c 2c
2c 2c 2c
2c
2d
2d
2dEM
EM
c,d
2a
2a
a
a
c,d
2d
2d
EM
a,b
a,b
EM
7a
7a
4a
4a4a
4a
4a 4a
4aEM
7a
4b
4b
4b
4b
4b 4b 4b
4b
4b
4b
4b
L2L-2&4
a,b
7a
EM
4a
4a
A1
a
a
4a
7a
EM
a
a
2 2
EM
a
2
EM
6a
6a
7a
B1
EM
EM
7a
B1
EM 7a
7aEM
B1
7a 7a6a 6a
EM
EM 7a
7a
6a 6a
INV-2-7
a
7aEM
2
6a
6a
6a
a
L2L-6&16
EM
EM EM
EM
EM
6R1
6R1
6R1
6R1
6R1
7R1
7R1
7R1
7R1
7R1
6R1
L2L-6 VIA
LCP-2-R1
INV-2-7 VIA
ELCP-2-R1
EM
7a
C1
EM
8a
C1
6a
2
8a 8a
A1
A1
A1
L2L-38
C1 C1EM EM
8a 8a
C1
EM
8a
EM
EM
EM
8a
8a
8a
8a
a
INV-2-8
a,b
8b
8a 8a 8a
8a8a
8a
8a8a
8a
8a
EM
EM
8a
8a
8a8a 8a8a
a a22
L2L-8
10b
10b
10b
10b
10b
10b
10b
10b
10b
10a
EM 10a
10a10a
10a
10a 10a
10a
10a 10a
8a
8a
EM
8a
EM
8a
EM8a
EM
10a
a,b,c
a,b,c
a,b,c
10c
10c
10c
a,b,c
L2L-10
EM
6
6
6
6
INV-2-9 VIA
ELCP-2-R2
INV-2-12 VIA
ELCP-2-R2
INV-2-10 VIA
ELCP-2-R3
INV-2-11 VIA
ELCP-2-R4
MAKER
SPACE
212
B1
INV-2-7 VIA
ELCP-2-R1
EM
a,b
L2L
INV-2
LCP-1
L2L-29
ELCP-2
7
J2
J2
J1 J1 J1
7
X 4
(TYP.)
X 4
4
X
X
4
4
C1 16
9
9
8
9
9
9
8
XF 109
XF 10
9
3
7R
1
6R
1
ER 6
C1
L2L-18
1. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND ELEVATION OF
ALL LIGHTING FIXTURES AND ALL LIGHTING CONTROL DEVICES. ALL WALL
MOUNTED DEVICES SHALL BE VERIFIED WITH ARCHITECT PRIOR TO ROUGH-IN.
2. CONTRACTOR SHALL VERIFY CEILING CONSTRUCTION WITH ARCHITECTURAL
PLAN AND PROVIDE LIGHTING FIXTURES WILL ALL NECESSARY MOUNTING
HARDWARE.
3. CONTRACTOR TO REFER TO DRAWING E0.02 FOR FIXTURE SCHEDULE.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING LIGHTING FIXTURES WITH
REQUIRED STRUCTURAL SUPPORTS.
5. REFER TO ARCHITECTURAL PLANS FOR EXIT SIGN CHEVRONS AND NUMBER
OF FACES PER EXIT SIGN. ANY DISCREPANCIES BETWEEN EXIT SIGNS SHOWN
ON ELECTRICAL AND ARCHITECTURAL PLANS SHALL BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT.
6. REFER TO DRAWING E3.03 FOR LIGHTING CONTROL DIAGRAMS AND DETAILS.
CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL LOW VOLTAGE WIRING AND
COMPONENTS TO PROVIDE A COMPLIANT AND FULLY WORKING LIGHTING
CONTROL SYSTEM. CONTROLS DIAGRAMS AND DRAWINGS ARE FOR
REFERENCE ONLY AND NOT PRICING AND SHALL NOT BE USE FOR
CONTRUCTION. CONTRACTOR SHALL PROVIDE COMPLETE TITLE 24
COMPLIANT LIGHTING CONTROL SUBMITTAL FOR REVIEW AND APPROVAL.
7. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED
FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP SYSTEM EQUAL OR
GREATER THAN THE FIRE RATING OF THE WALL.
8. SWITCH CORE AND FACEPLATES TO MATCH COLOR OF ADJACENT WALL.
9. CONTRACTOR TO PROVIDE JUNCTION BOXES AS NEEDED FOR A COMPLETE
LIGHTING INSTALLATION. THESE ARE NOT SHOWN FOR CLARITY OF
DRAWINGS. NO JUNCTION BOXES SHALL BE INSTALLED IN HARD-LID CEILINGS.
10. CONTRACTOR TO PROVIDE CONSTANT HOT CIRCUIT TO ALL EXIT SIGNS AND
LIGHT FIXTURES PROVIDED WITH 90 MINUTE BATTERY BACKUP FOR EGRESS.
11. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROTECTED
FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP SYSTEM EQUAL OR
GREATER THAN THE FIRE RATING OF THE WALL.
12. EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL
CONFORM TO CEC, ARTICLE 300.22(C).
13. PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN
CIRCUITRY.
14. WHEN EXPOSED CEILINGS OR OPEN GRID CONDITIONS OCCUR, THE
CONTRACTOR SHALL PROVIDE THE FOLLOWING:
14.1 ALL BRANCH CIRCUITS SHALL BE IN EMT CONDUITS
14.2 ALL BRANCH CIRCUITS SHALL BE ROUTED, NEATLY AND IN PARALLEL TO
STRUCTURES OR DUCT WORK.
14.3 VISUALLY OBJECTIONABLE BRANCH CIRCUITS SHALL BE REROUTED AT
THE REQUEST OF THE ARCHITECT AT NO ADDITIONAL COST.
15. PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT WHERE
OTHERWISE NOTED. HOME RUN CONDUCTORS MAY BE COMBINED INTO ONE
CONDUIT. NO RACEWAY OR CABLE SHALL CONTAIN MORE THAN NINE (9)
CURRENT CARRYING CONDUCTORS. WHERE MULTIPLE CONDUCTORS IN
EXCESS OF THREE (3) ARE INDICATED ON THESE DRAWINGS, THEY HAVE
BEEN DERATED AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS.
16. CONTRACTOR SHALL VERIFY WITH LIGHTING CONTROLS MANUFACTURER
THE TYPE QUANTITY AND BEST PLACEMENT OF OCCUPANT AND/OR
PHOTOCELL SENSORS AS SHOWN ON FLOOR PLAN. PER TITLE 24, OCCUPANT
SENSORS SHALL BE MOUNTED AT LEAST 4FT AWAY FROM AIR SUPPLY
REGISTER.
17. CONTRACTOR SHALL PROVIDE STARTUP AND COMMISSIONING SERVICES
FROM LIGHTING CONTROL MANUFACTURER TO SET UP, ADJUST AND
PROGRAM SOFTWARE SYSTEM FOR THE LIGHTING CONTROL SYSTEM TO
PROVIDE A COMPLETE AND OPERABLE SYSTEM.
18. NOT ALL JUNCTION BOXES ARE SHOWN ON DRAWINGS. CONTRACTOR
SHALL PROVIDE FOR A COMPLETE LIGHTING SYSTEM.
19. PROVIDE AN UN-SWITCHED HOT CIRCUIT WIRING TO ALL EMERGENCY LIGHT
FIXTURES AND EXIT SIGNS.
20. CONTRACTOR SHALL INCLUDE IN PRICING, ADDITIONAL 7 EXIT SIGNS,
CONDUIT AND WIRING THAT MIGHT BE INSTALLED DURING INSPECTIONS.
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
E3.0-3
ELECTRICAL
REMODEL SECOND
FLOOR LIGHTING
PLAN
1/8" = 1'-0"1 2 - ELECTRICAL RCP PLAN - SECOND FLOOR
1 LIGHTING IN THIS AREA SHALL BE CONTROLLED VIA TIMECLOCK
CONTROLS. OVERRIDE SWITCHES AND OCCUPANCY SENSORS SHALL
ONLY WORK DURING OFF HOURS.
2 PROVIDE LINE VOLTAGE OCCUPANCY SENSOR FOR THE AREA.
GENERAL NOTES
KEY NOTES
3 MANUAL OVERRIDE SWITCH FOR VESTIBULE LIGHTING SWITCH SHALL BE
IN-ACCESSIBLE DURING NORMAL BUSINESS HOURS.
6 EXISTING ROWS OF LED LIGHTING IN HIGH CEILINGS TO REMAIN.
CONTRACTOR SHALL RECONNECT EXISTING LIGHTING CIRCUITS AND
ROUTE THROUGH NEW LIGHTING CONTROL PANEL. LIGHTING INVERTER
AND PANELBOARD AS SHOWN AND INDICATED ON THE DRAWINGS.
INTERCEPT OF EXISTING CONDUITS AND CIRCUITS SHALL OCCUR IN THE
ATTIC SPACE.
4 EXIT SIGNS SHALL BE CONNECTED TO INVERTER PANEL INV-2-14. EXTEND
BRANCH CIRCUIT (CO0NDUIT AND WIRES (2#12 & 1#10 GND)) TO ALL EXIT
SIGNS.
5 INTERCEPT EXISTING POWER CONNECTION FOR LIGHTING SERVING
ATTIC SPACE. REROUTE THROUGH NEW PANELBOARD.
7 CONTRACTOR TO PROVIDE CONNECTION FROM NEAREST RECEPTACLE
AS SHOWN ON E2.4-3 FOR CONNECTION TO UNDERCABINET LIGHTING
SYSTEM. PROVIDE UNDERCABINET LIGHTS, JUMPER CONNECTIONS, AND
IN-WALL FEED CONNECTION FOR A COMPLETE SYSTEM.
8 EXIT SIGN SHALL BE CEILING MOUNTED.
9 EXIT SIGN SHALL BE WALL MOUNTED.
10 EXIT SIGN SHALL BE FLAG MOUNTED (ES MODEL UNDER MOUNTING).
REV # DESCRIPTION DATE
#005 ASI 11.27.2024
#021 RFI 03.28.2025
#212 RFI 07.09.2025
#281.1 RFI 10.08.2025
#024 ASI 10.10.2025
#353 RFI 02.11.2026
#353
RFI
VENTILATION CALCULATION FIRST FLOOR
ZONE # SERVICES RP PZ RA AZ VBZ EZ VOZ PROVIDED VENTILATION
VAV 1-3A GREAT READING ROOM 5 4 0.12 791.0 114.9 0.8 143.7 150
VAV 1-3B GREAT READING ROOM 5 8 0.12 892.4 147.1 0.8 183.9 200
VAV 1-3C GREAT READING ROOM 5 5 0.12 502.0 85.2 0.8 106.6 110
VAV 1-3C GREAT READING ROOM 5 4 0.12 400.0 68.0 0.8 85.0 100
VAV 1-4A GREAT READING ROOM 5 3 0.12 897.0 122.6 0.8 153.3 150
VAV 1-4B GREAT READING ROOM 5 4 0.12 793.0 115.2 0.8 144.0 150
VAV 1-5 GREAT READING ROOM 5 2 0.12 632.5 85.9 0.8 107.4 110
VAV 1-6 MEETING COMMUNITY ROOM 102 5 10 0.06 396.2 73.8 0.8 92.2 100
VAV 1-7 MEETING COMMUNITY ROOM 102 5 10 0.06 448.0 76.9 0.8 96.1 100
VAV 1-16 MEETING COMMUNITY ROOM 103 5 6 0.06 274.2 46.5 0.8 58.1 80
VAV 1-17 MEETING COMMUNITY ROOM 104 5 6 0.06 302.2 48.1 0.8 60.2 80
VAV 1-18 OFFICE 5 1 0.06 132.0 12.9 0.8 16.2 80
VAV 1-14 STAFF-M, STAFF-W, BOOK MOBILE ROOM 5 3 0.06 751.6 60.1 0.8 75.1 80
VAV 1-15 BOOK MOBILE ROOM 5 5 0.06 520.0 56.2 0.8 70.3 80
VAV 1-13 SORTING 5 1 0.06 606.3 41.4 0.8 51.7 60
VENTILATION CALCULATION SECOND FLOOR
ZONE # SERVICES RP PZ RA AZ VBZ EZ VOZ PROVIDED VENTILATION
VAV 2-1 OFFICE 5 6 0.06 305.0 48.3 0.8 60.4 70
VAV 2-2 STAFF OFFICE 5 2 0.06 312.2 28.7 0.8 35.9 40
VAV 2-3 STAFF OFFICE 5 4 0.06 272.0 36.3 0.8 45.4 50
VAV 2-4 HISTORY 5 4 0.06 486.3 49.2 0.8 61.5 70
VAV 2-5 HISTORY 5 4 0.06 487.2 49.2 0.8 61.5 70
VAV 2-6 STUDY 5 4 0.12 345.7 61.5 0.8 76.9 80
VAV 2-8A ADULT STACKS 5 11 0.12 1102.0 187.2 0.8 234.1 250
VAV 2-8B ADULT STACKS 5 10 0.12 1055.8 176.7 0.8 220.9 250
VAV 2-8C ADULT STACKS 5 11 0.12 1155.0 193.6 0.8 242.0 250
VAV 2-11 YA STUDY BOOTH, YOUNG ADULT 5 2 0.12 630.4 85.6 0.8 107.1 110
VAV 2-12 YOUNG ADULT 5 14 0.12 680.0 151.6 0.8 189.5 200
VAV 2-13 MAKER SPACE 10 12 0.12 605.5 192.7 0.8 240.8 250
VAV 2-14 MAKER BOOTH, RECORDING BOOTH, VIDEO EDITING BOOT 5 6 0.06 284.4 47.1 0.8 58.8 70
VENTILATION CALCULATION BASEMENT
FC UNIT# SERVICES RP PZ RA AZ VBZ EZ VOZ PROVIDED VENTILATION
FC-B3 STAFF OFFICE 001 5 4 0.06 743.0 64.6 0.8 80.7 90
FC-B4 STAFF OFFICE 001 5 13 0.06 927.5 120.7 0.8 150.8 160
FC-B5 STAFF OFFICE 001 5 13 0.06 1033.6 127.0 0.8 158.8 160
FC-B6 STAFF OFFICE 001 5 8 0.06 1006.5 100.4 0.8 125.5 130
FC-B7 STAFF OFFICE 001 5 13 0.06 996.5 124.8 0.8 156.0 160
FC-B8 STAFF OFFICE 001 5 13 0.06 1033.1 127.0 0.8 158.7 160
FC-B9 STAFF OFFICE 001 5 5 0.06 957.0 82.4 0.8 103.0 110
FC-B10 STAFF BREAK ROOM 004 7.5 8 0.18 374.5 127.4 0.8 159.3 160
FC-B11 STAFF MEETING ROOM 020 5 10 0.06 308.0 68.5 0.8 85.6 90
FC-B1 OFFICE 013, 014, STORAGE 015 5 3 0.06 419.0 40.1 0.8 50.2 60
FC-B2 OFFICE 016, 017, 018 5 3 0.06 372.0 37.3 0.8 46.7 60
FC-B1-1 ARCHIVE 002 5 2 0.06 1063.0 73.8 0.8 92.2 100
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
M0. 2
MECHANICAL
EQUIPMENT
SCHEDULE
VAV BOXES SCHEDULES
TYPE ZONE MANUFACTURER MODEL INLET
SIZE (IN)
AIR FLOW
CFM
AIR
P.D.
(IN.
WG.)
HW REHEAT COIL OPER
WT.
(LBS)
NOTES
MAX MIN CAP
(MBH)
FLOW
(GPM)
WPD
(FT.WG)
ROW
S
VAV 1-2 TITUS DESV 16 2000 1400 0.14 64.7 3.0 0.53 2 91
VAV 1-3A TITUS DESV 16 2000 1400 0.14 64.7 3.0 0.53 2 91
VAV 1-3B TITUS DESV 16 2000 1400 0.14 64.7 3.0 0.53 2 91
VAV 1-3C-1 TITUS DESV 16 2000 1400 0.14 64.7 3.0 0.53 2 91
VAV 1-3C-2 TITUS DESV 16 2000 1400 0.14 64.7 3.0 0.53 2 91
VAV 1-4A TITUS DESV 16 2000 1400 0.14 64.7 3.0 0.53 2 91
VAV 1-4B TITUS DESV 14 1500 1050 0.13 47.8 2.0 0.39 2 82
VAV 1-5 TITUS DESV 16 2000 1400 0.14 64.7 3.0 0.53 2 91
VAV 1-6 TITUS DESV 8 600 240 0.07 14.6 1 0.17 2 48
VAV 1-7 TITUS DESV 12 1200 480 0.07 30.0 2.0 0.55 2 68
VAV 1-10 TITUS DESV 8 310 217
VAV 1-11 TITUS DESV 10 640 448
VAV 1-12 TITUS DESV 8 440 308
VAV 1-13 TITUS DESV 8 550 220 0.06 14.0 1.0 0.17 2 48
VAV 1-14 TITUS DESV 12 1200 480 0.07 30 2.0 0.55 2 68
VAV 1-15 TITUS DESV 10 750 300 0.05 21.0 2.0 0.47 2 57
VAV 1-16 TITUS DESV 8 400 280
VAV 1-17 TITUS DESV 10 800 320 0.06 21.7 2.0 0.47 2 57
VAV 1-18 TITUS DESV 8 400 160 0.04 11.6 1.0 0.17 2 48
VAV 2-1 TITUS DESV 10 700 280 0.05 20.1 2.0 0.47 2 57
VAV 2-2 TITUS DESV 6 300 210
VAV 2-3 TITUS DESV 8 600 240 0.07 14.6 1.0 0.17 2 48
VAV 2-4 TITUS DESV 12 1200 480 0.07 30.0 2.0 0.55 2 68
VAV 2-5 TITUS DESV 8 450 315
VAV 2-6 TITUS DESV 10 800 320 0.06 21.7 2.0 0.47 2 57
VAV 2-8 TITUS DESV 16 3000 1200 0.14 64.7 3.0 0.53 2 91
VAV 2-9 TITUS DESV 6 400 160 0.056 10.6 1.0 0.12 2 45
VAV 2-11 TITUS DESV 10 800 560
VAV 2-12 TITUS DESV 16 2000 800 0.06 50 3 0.53 2 91
VAV 2-13 TITUS DESV 12 1500 600 0.10 33.5 2.0 0.55 2 68
VAV 2-14 TITUS DESV 8 600 240 0.07 14.6 1.0 0.17 2 48
VAV 2-15 TITUS DESV 6 500 200 0.08 12 1.0 0.12 2 45
VAV 2-16 TITUS DESV 8 600 240 0.07 14.6 1.0 0.17 2 48
FAN COIL SCHEDULE
TYPE TAG MANUFACTURER MODEL TYPE SERVES CFM
ESP
(in. wg)
MOTOR
TYPE
COOLING CAPACITY HEATING CAPACITY ELECTRICAL
WEIGHT
(LBS)
TOTAL
(MBH)
SENSIBLE
(MBH)
EAT (°F
DB/WB)GPM EWT(°F) LWT(°F) WPD (FT)
TOTAL
(MBH)GPM EWT(°F) LWT(°F) WPD(FT) HP AMP V/PH/HZ
FC B1 FIRST COMPANY 4*PHBC-32 CONCEALED OFFICE 013,014
AND STORAGE
015
340 0.3 ECM 10.1 6.7 80/67 2.5 40 50 9 17.7 2 180 140 5.1 1/7 1.4 115/1/60 48
FC B2 FIRST COMPANY 4*PHBC-32 CONCEALED OFFICE 016,
017, 018
300 0.3 ECM 10.1 6.7 80/67 2.5 40 50 9 17.7 2 180 140 5.1 1/7 1.4 115/1/60 48
FC B3 FIRST COMPANY 8*PHBC-32 CONCEALED STAFF OFFICE
001
720 0.3 ECM 22.8 15.6 80/67 5.5 40 50 10 38.6 3.0 180 140 4.8 1/2 4.6 115/1/60 57
FC B4 FIRST COMPANY 8*PHBC-32 CONCEALED STAFF OFFICE
001
720 0.3 ECM 22.8 15.6 80/67 5.5 40 50 10 38.6 3.0 180 140 4.8 1/2 4.6 115/1/60 57
FC B5 FIRST COMPANY 8*PHBC-32 CONCEALED STAFF OFFICE
001
720 0.3 ECM 22.8 15.6 80/67 5.5 40 50 10 38.6 3.0 180 140 4.8 1/2 4.6 115/1/60 57
FC B6 FIRST COMPANY 8*PHBC-32 CONCEALED STAFF OFFICE
001
720 0.3 ECM 22.8 15.6 80/67 5.5 40 50 10 38.6 3.0 180 140 4.8 1/2 4.6 115/1/60 57
FC B7 FIRST COMPANY 8*PHBC-32 CONCEALED STAFF OFFICE
001
720 0.3 ECM 22.8 15.6 80/67 5.5 40 50 10 38.6 3.0 180 140 4.8 1/2 4.6 115/1/60 57
FC B8 FIRST COMPANY 8*PHBC-32 CONCEALED STAFF OFFICE
001
800 0.3 ECM 22.8 15.6 80/67 5.5 40 50 10 38.6 3.0 180 140 4.8 1/2 4.6 115/1/60 57
FC B9 FIRST COMPANY 8*PHBC-32 CONCEALED STAFF OFFICE
001
800 0.3 ECM 22.8 15.6 80/67 5.5 40 50 10 38.6 3.0 180 140 4.8 1/2 4.6 115/1/60 57
FC B10 FIRST COMPANY 4*PHBC-32 CONCEALED STAFF BREAK
ROOM 004
360 0.3 ECM 10.1 6.7 80/67 2.5 40 50 9 17.7 2 180 140 5.1 1/7 1.4 115/1/60 48
FC B11 FIRST COMPANY 4*PHBC-32 CONCEALED STAFF
MEETING
ROOM 020
320 0.3 ECM 10.1 6.7 80/67 2.5 40 50 9 17.7 2 180 140 5.1 1/7 1.4 115/1/60 48
DX SPLIT SYSTEM FANCOIL UNIT
TYPE TAG MANUFACTURER MODEL
COOLING
CAPACITY
HEATING
CAPACITY
SERVES TYPE
EQUIP
SERVED COOLING(CFM)
HEATING(CF
M)ELECTRICAL
OPER WT.
(LBS)NOTES
TOTAL
(MBH)
TOTAL
(MBH)
FC ELEC SAMSUNG AR18CSDABWKNCV 18,000 20,000 ELECTRICAL ROOM 019 WALL
MOUNTED
CU-ELEC 533 CFM 554 POWERED BY
CONDENSING UNIT
27.6 ---
FC ELEV SAMSUNG AR09CSDABWKNCV 9,000 11,000 ELEVATOR CONTROL
ROOM
WALL
MOUNTED
CU-ELEV 357 CFM 392 POWERED BY
CONDENSING UNIT
23.4 ---
FC ELEV2 SAMSUNG AC018DNADCG 18,000 20,000 (E) ELEVATOR CONTROL
ROOM
WALL
MOUNTED
CU-ELEV2 615 CFM 554 POWERED BY
CONDENSING UNIT
25.8 ---
FC IT SAMSUNG AR18CSDABWKNCV 18,000 20,000 IT ROOM WALL
MOUNTED
CU-IT 533 CFM 554 POWERED BY
CONDENSING UNIT
27.6 ---
AIR-COOLED CONDENSING UNIT SCHEDULE - DUCTLESS
TYPE TAG MANUFACTURER MODEL LOCATION SEER/EER HSPF VOLTAGE
MAX.
BREAKER
MIN.
CIRCUIT
AMPACITY
OPER WT.
(LBS)
REFRIGERA
NT
CU B1-1
CU ELEC SAMSUNG AR18CSDABWKXCV ROOF 21 /13 8.5 1 /208-230/
60
30 21 122 R410A
CU ELEV SAMSUNG AR09CSDABWKXCV ROOF 24.5/15.5 10.5 1 /208-230/
60
20 12 71.4 R410A
CU ELEV2 SAMSUNG AR09CSDABWKXCV ROOF 20.5/12.2 9.5 1 /208-230/
60
25 22.7 117 R-32
CU IT SAMSUNG AR18CSDABWKXCV ROOF 21 /13 8.5 1 /208-230/
60
30 21 122 R410A
REV # DESCRIPTION DATE
RFI-53 02.19.2025
#020 ASI 03.21.2025
#142 RFI 04.28.2025
#353 RFI 02.11.2026
#036 ASI 01.26.2021
#353
RFI #353
RFI
T B-3
T
B-1
T
B-4
T B-8
T
B-2
T
B-6
T B-10
T
B-11
T
B-7
T
B-5
TB-9
TVAV-B-1
T
FC
-B1
-1
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
B1 B2
B3 B4 B5 B6 B7 B8
B9
B10
B11
FC-B1-1
FC-ELEC
STAFF
OFFICE
001
OFFICE
012
OFFICE
013
STAFF
MEETING
ROOM
014
OFFICE
015
OFFICE
017
ARCHIVES
002
ELEV.
CONTROL
018
ELECTRICAL
019
MECH-ABAN.
008 ELEVATOR-ABAN.
007
FIRE
AL.RM
006
MECH
003
(E) ELEV.
CONTROL
RM.
005A
STAFF
BREAK
ROOM
004
ALL
GENDER
RESTROOM
010
?
?
STAFF
OFFICE
001
STAFF
OFFICE
001
B1 OFFICE
016
FC-ELEV
FC-ELEV2
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
M2.1-1
MECHANICAL
BASEMENT ZONING
PLAN
1/8" = 1'-0"1 MECHANICAL ZONING PLAN - BASEMENT
GENERAL NOTES
1. ZONE TAGS - REFER TO VAV SCHEDULE
REV # DESCRIPTION DATE
#353 RFI 02.11.2026
#035 ASI 02.05.2026
#353
RFI
T B-3
T
B-1
T
B-4
T B-8
T
B-2
T
B-6
T B-10
T
B-11
T
B-7
T
B-5
TB-9
TVAV-B-1
T
FC
-B1
-1
T
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
72"x20"
240
CD-2
240
CD-2
240
CD-2
180
CD-2
180
CD-2
180
CD-2
180
CD-2
240
CD-2
240
CD-2
180
CD-2
180
CD-2
180
CD-2
180
CD-2
240
CD-2
240
CD-2
100
CD-1
(TYP. OF 3)
100
CD-1
(TYP. OF 2)
(TYP. OF 2)
(TYP. OF 2)
14"ø
10"ø
10"ø 14"ø
12"ø
10"ø
8"ø
8"ø
14"ø
12"ø
10"ø
14"ø
12"ø
10"ø
10"ø
10"ø
14"ø
12"ø
10"ø
8"ø
8"ø
14"ø
12"ø
10"ø
14"ø
180
CD-2
240
CD-2
180
CD-2
180
CD-2
240
CD-2
10"ø
32"X30"
OUTSIDE AIR
12"ø
10"ø
10"ø
10"ø8"ø
8"ø8"ø
8"ø
180
CD-2
FC
B3 FC
B4
FC
B5
FC
B6 FC
B7
FC
B8
FC
B9
FC
B1
140
CD-1
10"x10"
6"ø 6"ø 8"ø
8"ø
10"x8"
8"ø
10"x8"
8"ø 8"ø
FC
B10
FC
B2
FC
B11
10"x8"
8"ø 8"ø
FC
ELEV
7DSD7
DSD
7
DSD
7
DSD
7
DSD
7
DSD
7
DSD
1
5
DSD
7
4
3
2
EF
B-2
EF
B-1
----
RG-1
----
RG-1
----
RG-1 ----
RG-1
----
RG-1 ----
RG-1
----
RG-1
6"ø
8"ø
6"ø
10"ø
8"ø
8"ø
14"ø
14"ø
8"ø
8"ø
10"ø
8"ø
180
CD-1
160
CD-1
6"ø
12"ø
8"ø
16"ø
12
9
8
12
12
12
9 12
10
8
11
13
8"ø 8"ø
8"ø8"ø
8"ø8"ø
8"ø 8"ø
180
SD-5
180
SD-5
180
SD-5
14
FC
ELEC
----
RG-1
----
RG-1
----
RG-1
----
RG-1
----
RG-1
----
RG-1
----
RG-1
----
RG-1
----
RG-1
----
RG-1
----
RG-1
----
RG-1
8"ø
----
RG-1
6"ø
8"ø
U/CU/C
15 15
6
AHU
B-1
8"Ø EXHAUST DUCT
CONNECTED TO
WATER HEATER.
6"ø6"ø
6"x6"
(TYP.)
(TYP. OF 4)
FC
B1-1
300
SD-6
10"ø
12"x10"
12"x12"
14"x14"
10"ø
6"ø
1100
RG-2
FC
ELEV2
MECH
003
?
?
OFFICE
013
STAFF
MEETING
ROOM
014
OFFICE
015
OFFICE
017
(E) ELEV.
CONTROL
RM.
005A
ARCHIVES
002
FIRE
AL.RM
006
ELEVATOR-ABAN.
007
MECH-ABAN.
008
STAFF
OFFICE
001
STAFF
BREAK
ROOM
004
398 SF
OFFICE
016
ALL
GENDER
RESTROOM
010
ELECTRICAL
019
JANITOR
022
STORAGE
023
STORAGE
005
221 SF
ELEV.
CONTROL
018
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
M2.4-1
MECHANICAL
BASEMENT FLOOR
PLAN - REMODEL
1/8" = 1'-0"1 MECHANICAL REMODEL PLAN - BASEMENT
KEY NOTES
1 EXISTING 60"X36" FLOOR OPENING FOR (E) 60"X36" RETURN AIR TUNNEL.
REMOVE AND DISCARD EXISTING FLOOR DAMPER AND REPLACE WITH
NEW DAMPER AND AUTOMATED ACTUATOR FOR AIR BALANCING.
2 EXISTING 26"X24" FLOOR OPENING FOR (E) 26"X24" OUTSIDE AIR TUNNEL.
REMOVE AND DISCARD EXISTING OUTSIDE AIR FLOOR DAMPER AND
REPLACE WITH NEW DAMPER AND AUTOMATED ACTUATOR FOR AIR
BALANCING.
3 EXISTING 32"X30" FLOOR OPENING FOR (E) 32"X30" OUTSIDE AIR TUNNEL.
REMOVE AND DISCARD EXISTING OUTSIDE AIR FLOOR DAMPER AND
REPLACE WITH NEW DAMPER AND AUTOMATED ACTUATOR FOR AIR
BALANCING.
4 72"X20"(1"L) SUPPLY AIR DUCT UP TO SECOND FLOOR.
5 72"X20"(1"L) SUPPLY AIR DUCT UP TO FIRST FLOOR
6 8"X6" EXHAUST DUCT UP TO FIRST FLOOR
7 PROVIDE NEW DUCT SMOKE DETECTOR. AUTOMATIVE SHUTOFF SHALL
BE ACCOMPLISHED BY INTERUPTING THE POWER SOURCE OF THE UNIT
UPON DETECTION OF SMOKE IN THE MAIN SUPPLY AIR DUCT.
8 OUTSIDE AIR VOLUME DAMPER SET @ 60 CFM
9 OUTSIDE AIR VOLUME DAMPER SET @ 90 CFM
10 OUTSIDE AIR VOLUME DAMPER SET @ 110 CFM
11 OUTSIDE AIR VOLUME DAMPER SET @ 130 CFM
12 OUTSIDE AIR VOLUME DAMPER SET @ 160 CFM
13 16"⌀OUTSIDE AIR DUCT UP TO THE ROOF TO SUPPLY FAN SF-1
14 SIEMENS DDC CONTROL PANEL.
15 CEILING EXHAUST FAN PROVIDED WITH BACKDRAFT DAMPER.
16 OUTSIDE AIR VOLUME DAMPER SET @ 100 CFM
REV # DESCRIPTION DATE
#020 ASI 03.21.2025
#187 RFI 12.15.2025
#353 RFI 02.11.2026
#036 ASI 01.26.2021
#035 ASI 02.05.2026
#353
RFI
T1-5
T
T
1-7
T 1-16
T1-17
T 1-18
T
1-13
T 1-12
T
1-11
T
1-10
T
1-14
T
1-5
T
1-2
T1-15
T T
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
2000
SD-3
2000
SD-3
1500
SD-2
40"x8"
40"x8"
1000
SD-1
1000
SD-1
VAV
1-3B
VAV
1-3C-1
VAV
1-3C-2
VAV
1-4A VAV
1-4B
VAV
1-5
24"x10"
30
"
x
1
2
"
12"x10"
350
CD-5
200
CD-3 VAV
1-13
14"ø
10"ø
50
CD-760"x12"
60"x12"
12"x10"
20"x72"
8"ø
14"ø
14"ø
14"ø
14"ø
14"ø
12"ø
12"x10"
50
CD-7
6"ø
200
CD-3
400
CD-6
400
CD-6
400
CD-6
400
CD-6
400
CD-6
400
CD-6
200
CD-3
200
CD-3
200
CD-3
8"ø
350
CD-5
350
CD-5
350
CD-5
200
CD-3
200
CD-3
10"ø 6"ø
6"ø
200
CD-3
200
CD-3
200
CD-3
VAV
1-18VAV
1-15
VAV
1-16
12"ø
VAV
1-17
VAV
1-7
2000
SD-3
72"x10"
72"x10"
72"x10"
72"x10"
60"x12"
VAV
1-3A
14"ø
60"x12"60"x12"
VAV
1-128"x10"
8"x6"
6"ø
6"ø
110
CD-4
(TYP. OF 4)
155
CD-3
(TYP. OF 2)
24"x10"
12
"
x
1
0
"
12
"
x
1
0
"
8"ø
(TYP.)
(TYP. OF 4)
(TYP. OF 4)
CSFD
CSFD
FC
IT
VAV
1-2
30
"
x
1
2
"
1000
SD-1
1000
SD-1
24"x10"
2
1
3
4
CSFD
CSFD5
40"x6"
40"x6"
10"ø
10"ø
2000
SD-3
300
EG-1
160
CD-8
100
EG-2
6"ø 10"ø
10"ø
100
EG-2
250
EG-1
300
TG-1
300
TG-1
600
TG-2
VAV
1-11
48
"
x
1
2
"
6"ø
12"ø
6
7
----
RG-1
----
RG-1
----
RG-1
----
RG-1
----
RG-1----
RG-1
----
RG-1
----
RG-1
----
RG-1
8"ø
VAV
1-6
8"ø
8"ø
12"ø
12"ø
72"x24"
8
9
10
8"x6"
11
200
CD-1
(TYP. OF 6)
8"ø
8"ø
8"ø10"x8"
10"x8"
10"x8"
8"ø
8"ø
8"ø
8"ø
8"ø10"x8"
230
CD-1
(TYP. OF 6)
16"x12"
20"x12"
8"ø 12"x8"
8"ø
8"ø
12"x8"
8"ø
8"ø
12"x8"
8"ø
24"x12"
30"x12"
18"x12"
24"x12"
12"x12"
210
CD-1
(TYP. OF 2)
26"x12"
----
RG-1
(TYP. OF 10)
AHU
1-1
100
EG-2
(TYP. OF 2)
8"x6"
6"ø
6"ø
16"x10"
10"ø
10"ø
6"ø
100
EG-2
24"x10"
12
30"x12"
14"x12"
12"ø
10"ø
10"ø
10"ø
8"ø
10"ø
12"ø
8"ø
8"ø
10"ø
14"ø
VAV
1-14
----
RG-1
----
RG-1
8"ø
12"ø
12"ø
10"ø8"ø
40"x8"
8"ø
VAV
1-10
8"x8"
8"ø8"ø
6"ø
CSFD
13
20"x72"R.A
14
40"x8"40"x8"
2000
SD-3
#402
RFI
#402
RFI
#402
RFI
#402
RFI
#402
RFI#402
RFI
#402
RFI
1-3B
1-3C-1
1-3C-2
1-4A
#402
RFI
1-3A
#402
RFI
1-4B
#402
RFI
GREAT
READING
ROOM
101
YOUTH
STACKS
117
MECH.
113
ALL
GENDER
RESTROOM
114
ALL
GENDER
RESTROOM
115
NURSING/SENSORY
116
JAN. RM
112
MEN RR
110
WOMEN
RR
111
FIREPLACE
ROOM
122
STORAGE
108
BOOKSTORE
109
SORTING
123
STAFF
MEN
RESTROOM
105
BOOKMOBILE
ROOM
103
OFFICE
103A
TODDLERS
AND
INFANTS
120
STAFF-WOMEN
RESTROOM
104
FAMILY
ZONE
121
MEETING/COMMUNITY
ROOM
102
I.T.
106
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
M2.4-2
MECHANICAL
FIRST FLOOR PLAN
- REMODEL
1/8" = 1'-0"1 MECHANICAL REMODEL PLAN - FIRST FLOOR
KEY NOTES
1 24"X10" EXHAUST DUCT UP TO THE SECOND FLOOR.
2 12"X10" EXHAUST DUCT UP TO THE SECOND FLOOR.
3 72"X20"(1"L) SUPPLY AIR DUCT UP TO THE SECOND FLOOR AND DOWN TO
THE BASEMENT.
4 72"X20"(1"L) SUPPLY AIR DUCT DOWN TO THE BASEMENT.
5 NEW AIR HANDLING UNIT. REFER TO MECHANICAL EQUIPMENT
SCHEDULES.
6 16"⌀OUTSIDE AIR DUCT UP TO THE ROOF TO SUPPLY FAN SF-1.
7 SIEMENS DDC CONTROL PANEL.
8 CONNECT NEW OUTSIDE AIR DUCT TO EXISTING AIR INTAKE WALL
LOUVER.
9 8' x 2' EXISTING OUTSIDE AIR INTAKE LOUVER TO BE REPLACE WITH 8' x 2'
NEW OUTSIDE AIR INTAKE LOUVER.
10 3' x 2' EXISTING OUTSIDE AIR INTAKE LOUVER TO BE REPLACE WITH 3' x 2'
NEW OUTSIDE AIR INTAKE LOUVER.
11 8"X6" EXHAUST DUCT DOWN TO THE BASEMENT LEVEL
12 O.A VOLUME DAMPER SET @ 850 CFM
13 24"X24" WALL ACCESS PANEL TO ACCESS DUCT MOUNTED COMBINATION
FIRE SMOKE DAMPER AT FLOOR PENETRATION.
14 COMBINATION FIRE SMOKE DAMPER TO BE INSTALLED AT FLOOR
PENETRATION.
REV # DESCRIPTION DATE
#020 ASI 03.21.2025
#142 RFI 04.28.2025
#178 RFI 06.10.2025
#251 RFI 09.23.2025
#402 RFI 03.10.2026
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
EF
1-2
EF
1-1
CU
IT
CU
ELEV
2
1
CU
ELEC
3
4
4
SF
B1
16"ø
5
55
6
444
777
CU
B1-1
8
5
CU
ELEV2
5
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
M2.4-4
MECHANICAL
ROOF PLAN -
REMODEL
1/8" = 1'-0"1 MECHANICAL ROOF PLAN
KEY NOTES
1 24"X10" EXHAUST DUCT DOWN THRU THE ROOF.
2 12"X10" EXHAUST DUCT DOWN THRU THE ROOF.
3 16"⌀OUTSIDE AIR DUCT DOWN THRU THE ROOF.
4 EXHAUST AIR TERMINATION SHALL BE NOT LESS THAN 10 FEET FROM
OUTSIDE AIR INTAKE.
5 8" MINIMUM ROOF LEVEL PAD (SEE DETAIL 7 / M4.0-3)
6 8" EXHAUST AIR DUCT UP FROM SECOND FLOOR.
7 6"⌀EXHAUST DUCT DOWN THRU THE ROOF TO THE SECOND FLOOR.
8 REFRIGERANT PIPES DOWN THRU THE ROOF.
REV # DESCRIPTION DATE
#020 ASI 03.21.2025
#187 RFI 12.15.2025
#353 RFI 02.11.2026
#353
RFI
R
SM-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-2
LOCL-2
LOCL-2
LOCL-2
LOCL-2
LOCL-2
LOCL-2
LOCL-2
FOL-2
FOL-2
FOL-2
FOL-2
FOL-2
FOL-2
FOL-2
FOL-2
OPS2
SM-1 SM-1
SM-1
OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2 OPS2OPS2 OPS2 OPS2 OPS2
SM-1
FOL-2FOL-2FOL-2FOL-2FOL-2
FOL-3FOL-3FOL-3FOL-3
FOL-3FOL-3FOL-3FOL-3
FOL-3
FOL-3
FOL-3FOL-3FOL-3FOL-3
FOL-3FOL-3FOL-3FOL-3
FOL-3
FOL-3
FOL-3FOL-3FOL-3FOL-3
FOL-3FOL-3FOL-3FOL-3
FOL-3
FOL-3
SM-1
SM-1
FOL-2 FOL-2 FOL-2 FOL-2 FOL-2FOL-2FOL-2FOL-2
LOCL-3 LOCL-3 LOCL-3 LOCL-3 LOCL-3 LOCL-3 LOCL-3 LOCL-3
LOCL-2
LOCL-2
LOCL-2
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-1
LOCL-2 LOCL-2 LOCL-2 LOCL-2
FE
C
FE
C
FE
C
DW
SM
-
1
S
M
-
1
S
M
-
1
SM
-
1
S
M
-
1
SM
-
1
S
M
-
1
SOPS SOPS SOPS
SOPS
SOPS
SO
P
S
S
O
P
S
SOPS
SOPS
SOPS
SOPS
SOPS SOPS
SM
-
2
SM
-
1
SM-1
SM
-
1
SM
-
1
SM-1
SM
-
1
FE
C
SM
-
1
SOPS
FE
C
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
CC
DD
EE
FF
HH
1
P2.5-1
2
P2.5-1
2"
W
1 1/2" CW2
1
/
2
"
C
W
2"
W
4"
W
4" F
4"
F
4" F
EXISTING
FIRE SPRINKLER
ENTRANCE
3
3
21
1
(WC)
4" W
2"
W
2" W
(WC)
(DF)
(LV)(LV)
4" W
2"
W
(LV)
(DF)CO
3/
4
"
C
D
3/
4
"
C
D
1" CD
3/
4
"
C
D
3/
4
"
C
D
1" CD
3/4" CD
3/
4
"
C
D
3/
4
"
C
D
3/
4
"
C
D
1" CD1" CD 1" CD
3/
4
"
C
D
3/
4
"
C
D
3/4" CD
3/
4
"
C
D
3/4" CD
CO
CO CO
CO
FAN COIL
SEE SHEET
M2.4-1
4
4 4 4
FAN COIL
SEE SHEET
M2.4-1
FAN COIL
SEE SHEET
M2.4-1
FAN COIL
SEE SHEET
M2.4-1
FAN COIL
SEE SHEET
M2.4-1
4 4
4
FAN COIL
SEE SHEET
M2.4-1
FAN COIL
SEE SHEET
M2.4-1
FAN COIL
SEE SHEET
M2.4-1
FAN COIL
SEE SHEET
M2.4-1
4
4
4
4FAN COIL
SEE SHEET
M2.4-1
FAN COIL
SEE SHEET
M2.4-1
FAN COIL
SEE SHEET
M2.4-1
4
FAN COIL
SEE SHEET
M2.4-1
5 2"FS-1
TP-2
2"FS-1
TP-2
5
7
2"
W
3/4" CD
1/
2
"
C
W
WCO
2" V
(E)4" W
NOTE:
CONTRACTOR TO CAMERA
SCOPE THE EXISTING
SEWER LINE AND VERIFY
EXISTING SEWER PIPE
ROUTINGS
4" W
(E)FS
2" W
co
2" W 2" W(FD)
(FD)
3"
S
D
SEE CIVIL FOR
CONTINUATION
4 CO
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.
SHEET NOTES
N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
ELECTRICAL-PLMUMBING-MECHANICAL
1920 MAIN STREET, SUITE 820
IRVINE, CA92614
TEL: 949.516.6480
BID SET
FINAL PERMIT/CONFORM
SET
04/30/2024
08/02/2024
P2.4-1
PLUMBING FLOOR
PLAN BASEMENT
1/8" = 1'-0"1 PLUMBING REMODEL PLAN - BASEMENT
CONNECT THE NEW SANITARY SEWER TO THE EXISTING
SANITARY SEWER OF EQUAL OR GREATER SIZE. FIELD
VERIFY THE EXACT LOCATION, SIZE, AND INVERT ELEVATION
OF THE EXISTING SANITARY SEWER PRIOR TO
CONSTRUCTION. ADJUST THE NEW SANITARY SEWER AS
REQUIRED TO ALLOW FOR CONNECTION TO THE EXISTING
SANITARY SEWER SYSTEM. MAINTAIN CODE MINIMUM PIPE
SLOPES.
CONNECT THE NEW DOMESTIC COLD WATER LINE TO AN
EXISTING COLD WATER LINE OF EQUAL OR GREATER SIZE.
FIELD VERIFY THE EXACT LOCATION AND SIZE OF THE
EXISTING WATER LINE PRIOR TO CONSTRUCTION. ADJUST
THE NEW WATER LAYOUT AS REQUIRED TO ALLOW FOR
CONNECTION TO THE EXISTING WATER SYSTEM.
CONNECT THE NEW FIRE SPRINKLER LINE TO AN EXISTING
FIRE SPRINKLER LINE LINE OF EQUAL OR GREATER SIZE.
FIELD VERIFY THE EXACT LOCATION AND SIZE OF THE
EXISTING FIRE SPRINKLER LINE LINE PRIOR TO
CONSTRUCTION. ADJUST THE NEW FIRE SPRINKLER LAYOUT
AS REQUIRED TO ALLOW FOR CONNECTION TO THE EXISTING
FIRE SPRINKLER SYSTEM.
PIPE PRIMARY CONDENSATE FROM EQUIPMENT TO BECKETT
MODEL BK221UL HEAVY DUTY VERTICAL CONDENSATE PUMP.
THE CONDENSATE SHALL BE CONNECTED TO THE
EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS. THE PIPE ROUTING INDICATED ON THE
PLANS IS FOR REFERENCE ONLY. INSTALL THE PIPING AS
HIGH AS POSSIBLE AND COORDINATE ROUTING WITH
STRUCTURAL, MECHANICAL, ELECTRICAL, ETC. CONDENSATE
SHALL NOT BE RUN OVER ELECTRICAL EQUIPMENT.
CONDENSATE DRAIN TO DISCHARGE INDIRECTLY TO FLOOR
SINK WITH CODE APPROVED AIR GAP PER CALIFORNIA
PLUMBING CODE.
3/4"CONDENSATE DRAIN TO DISCHARGE INDIRECTLY TO
LAVATORY TAILPIECE WITH CODE APPROVED AIR GAP PER
CALIFORNIA PLUMBING CODE.
3/4"CONDENSATE DRAIN TO DISCHARGE INDIRECTLY TO MOP
SINK WITH CODE APPROVED AIR GAP PER CALIFORNIA
PLUMBING CODE.
1
2
3
4
5
6
7
REV # DESCRIPTION DATE
#020 ASI 03.21.2025
096 RFI 03.27.2025
25 ASI 07.31.2025
310 RFI 12.16.2025
#353 RFI 02.11.2026
#353
RFI
(4
'
-
1
0
7_8")
(9'-91_
4")(2'-33_
4")
(4
'
-
1
0
7_8")
(3'-41_
2")
(1
'
-
3
3_4")
(9'-107_
8")
(6
5_8")
311_
2"
44
3_4"
96"
443_
4"
31
1_2"
36
"
333_
4" 351_
2"
18"311_
2"
44
3_4"
1513__
16"
36"MIN REQ'D 36"MIN REQ'D
443_
4"
31
1_2"
36
"
12"
DS-1C
DS-1C
DS-1C
DS-1C
(N)
(N)(N)
(N)(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
4' -2"
4' -8"
4' -5-1/2"
5'
5' -6"5' -6"
5' -8-1/2"
10' -2-1/2"
10' -11"
6'
29
'
-
6
"
6' -8-1/2"
6'
-
1
0
"
5'
-
2
-
1
/
2
"
4' -2"
4' -8-1/2"
21
'
-
5
"
1'
-
1
0
"
6' -6"
5'
7'
-
1
1
"
5'
5' -9"
7'
-
7
-
1
/
2
"
7'
-
9
-
1
/
2
"
4' -8"
12' -8-1/2"
5'
-
1
1
-
1
/
2
"
12' -2-1/2"
4' -5-1/2"
6' -7-1/2"
7' -2-1/2"
10' -1-1/2"
8'
-
3
"
6'
-
7
-
1
/
2
"
5' -7"
2'
9'
-
2
-
1
/
2
"
11
'
-
7
-
1
/
2
"
TR-1D
FIELD CUT TOP
AROUND
COLUMN
*5
'
1
0
"
o
r
s
h
o
rt
e
r
TR-1C
WS-2WS-2
WS-2
TR-1D
TR-1D
TR-1G
CT-1
CT-1
TR-1FC
TR-1A
TM-1B
ST-2
TM-1C
TM-1B
TM-1B
TR-1ETR-1E
CR-6
TR-FA
CR-6
TR-FA
TS-1B
CR-6
CR-6
CR-6
CR-5
CR-6
CR-5
CT-1
CR-6
TM-1C
TR-1FB
CR-5CR-5
CR-6
SS
-
1
A
TS-1B
TM-1B
SS
-
1
A
CT-1
SS
-
1
A
WS-3
TS-1A
CR-8
CT-1 (modified)
CT-1
CT-1
CT-1
WS-1WS-1
CL-5
B-1
CL-5
CL-3
CL-3CL-3
CL-5
CL-3
CR-8
CR-8
CR-8
CR-8
CT-1
CR-8
CR-8 CR-8
CR-8
CL-5
CT-1
TS-3
CR-8
TS-3
CR-8
CR-83'
-
8
-
1
/
2
"
3'
6' -5-1/2"
5' -11"
2' -6"
2' -6"
5' -10-1/2"
2' -2"
7' -0-1/2"
3' -1"
5' -11"
3' -7-1/2"
1' -0-1/2"
4' -5-1/2"
5' -2"
5' -5"
3' -7"
6' -8"
7' -1-1/2"
4' -0"
3' -1"
3' -4"
5' -9"
FM 1 Circuit- 15 AMP Required
Duplex Plug In- Power & Data
FM 1 Circuit- 15 AMP Required
Duplex Plug In- Power & Data
Duplex Core
1 Circuit- 15 AMP Required
Duplex Plug In- Power Only
Duplex Core
1 Circuit- 15 AMP Required
Duplex Plug In- Power Only
8' 8' 8' 33'-6" 8' 8' 8' 20'-8"21'-5"
14'-2"13'-10"
13'-7"
12'-8"
ELECTRICAL
CY
E
F
G
C
Y
E
F
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
C
A
E
N
G
C
A
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
HI
T
E
M
CY
E
F
G
C
Y
E
F
G
MI
S
C
CA
E
N
G
C
A
E
N
G
C
A
E
N
G
CY
E
F
G
CY
E
O
M
CY
E
O
P
CAENH CAENH CAENHCAENH
HI
T
E
M
HI
T
E
M
HI
T
E
M
HI
T
E
M
HI
T
E
M
HI
T
E
M
HI
T
E
M
HI
T
E
M
HI
T
E
M
HI
T
E
M
HI
T
E
M
HI
T
E
M
MI
S
C
CY
E
O
P
CYEGN
CY
E
G
N
C
Y
E
G
N
C
Y
E
G
N
CY
E
G
N
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CA
E
N
G
CYEOP
CAENHCAENHCAENC
HI
T
E
M
H
I
T
E
M
OB
O
B
FE
C
FE
C
FEC
CYEOP CYEOP CYEOP
SOPS
SOPS
AF
I
C
HITEM HITEM
AF
I
C
A
F
I
C
A
F
I
C
AF
I
C
A
F
I
C
CY
E
F
G
(4
'
-
1
0
7_8")
(9'-91_
4")(2'-33_
4")
(4
'
-
1
0
7_8")
(3'-41_
2")
(1
'
-
3
3_4")
(9'-107_
8")
(6
5_8")
311_
2"
44
3_4"
96"
443_
4"
31
1_2"
36
"
333_
4" 351_
2"
18"311_
2"
44
3_4"
1513__
16"
36"MIN REQ'D 36"MIN REQ'D
443_
4"
31
1_2"
36
"
12"
DS-1C
DS-1C
DS-1C
DS-1C
(N)
(N)(N)
(N)(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
(N)
4' -2"
4' -8"
4' -5-1/2"
5'
5' -6"5' -6"
10' -2-1/2"
10' -11"
6'
29
'
-
6
"
6' -8-1/2"
6'
-
1
0
"
4' -2"
4' -8-1/2"
21
'
-
5
"
1'
-
1
0
"
6' -6"
5'
7'
-
1
1
"
5'
5' -9"
7'
-
7
-
1
/
2
"
7'
-
9
-
1
/
2
"
4' -8"
12' -8-1/2"
5'
-
1
1
-
1
/
2
"
12' -2-1/2"
4' -5-1/2"
6' -7-1/2"
7' -2-1/2"
10' -1-1/2"
8'
-
3
"
6'
-
7
-
1
/
2
"
5' -7"
9'
-
2
-
1
/
2
"
11
'
-
7
-
1
/
2
"
TR-1D
FIELD CUT TOP
*5
'
1
0
"
o
r
s
h
o
rt
e
r
TR-1C
WS-2WS-2
WS-2
TR-1D
TR-1D
TR-1G
CT-1
CT-1
TR-1FC
TR-1A
TM-1B
ST-2
TM-1C
TM-1B
TM-1B
TR-1ETR-1E
CR-6
TR-FA
CR-6
TR-FA
TS-1B
CR-6
CR-6
CR-6
CR-5
CR-6
CR-5
CT-1
CR-6
TM-1C
TR-1FB
CR-5CR-5
CR-6
SS
-
1
A
TS-1B
TM-1BCT-1
SS
-
1
A
WS-3
TS-1A
CR-8
CT-1 (modified)
CT-1
CT-1
CT-1
WS-1WS-1
CL-5
B-1
CL-5
CL-3
CL-3CL-3
CL-5
CL-3
CR-8
CR-8
CR-8
CR-8
CT-1
CR-8
CR-8 CR-8
CR-8
CL-5
CT-1
TS-3
CR-8
TS-3
CR-8
CR-83' -8-1/2"
6' -5-1/2"
5' -11"
2' -6"
5' -10-1/2"
2' -2"
7' -0-1/2"
3' -1"
5' -11"
3' -7-1/2"
1' -0-1/2"
4' -5-1/2"
5' -2"
5' -5"
3' -7"
6' -8"
7' -1-1/2"
4' -0"
3' -1"
3' -4"
5' -9"
FM 1 Circuit- 15 AMP Required
Duplex Plug In- Power & Data
FM Duplex Plug In- Power & Data
Duplex Core
1 Circuit- 15 AMP Required
Duplex Plug In- Power Only
Duplex Core
1 Circuit- 15 AMP Required
Duplex Plug In- Power Only
8' 8' 8' 33'-6" 8' 8' 8' 20'-8"
14'-2"13'-10"
13'-7"
12'-8"
ELECTRICAL
2T
2T
FT
FT
12345678910
C
D
E
F
G
H
Adult Non-Fic
Map Table
Map
Cabinet
YA
G
r
a
p
h
i
c
N
o
v
e
l
YA
F
i
c
t
i
o
n
YA Paperback
HISTORY
222
YOUNG
ADULT
211
STUDY
202
ALL GENDER
RESTROOM
2T1
ALL GENDER
RESTROOM
2T2
STAFF
RESTROOM
2T3
STUDY
220
STAFF
MEETING
ROOM
221
ADULT
STACKS
200
VESTIBULE
SEATING
200A
STUDY
201JAN.RM
217
STAIR 3
2S3 MAKER
STORAGE
216
Dumbwaiter
Maker
Shelving
OFFICE
226
OFFICE
223
STAFF
OFFICE
224
YA STUDY
BOOTH
211A
Dream Box
AV
Closet
Pr
i
n
t
e
r
Printer
Existing
maker table
VIDEO
RECORDING
BOOTH
214
VIDEO
EDITING
BOOTH
213
MAKER
SPACE
212
OFFICE
225
ELEC. RM.
218
STORAGE
200B
Ov
e
r
s
i
z
e
Bo
o
k
s
No
n
-
Bo
o
k
It
e
m
s
No
n
-
Bo
o
k
I
t
e
m
s
Piano
O.F.O.I
Ar
c
a
d
e
ma
c
h
i
n
e
s
222-BA
2D
222-BB
2D
222-DA
2D
220-BA
2D
201-AA
2D
212-DA
2D
212-DB
4D
216-EA
4D
216-DA
2D
211-DA
A
1D
213-BA
2D
211-CA
2D
211-CB
2D
225-CA
4D
226-CA
4D
202-CB
A
1D
201-BB
A
1D
201-BA
N
2D
211A-BA
A
1D
224-CA
2D
224-AA
2D
224-AB
2D
221-CA
A
1D
212-DC
A
1D
212-BA
2D
202-CA
2D
214-AA
2D
211A-BB
N
2D
221-CB
N
2D
TKN2012
213-DA
2D
TKN0019
TKN0019
200-EA
FP4
2D
222-EB
FP6
4D
222-EA
FP4
2D
212-EA
FP6
2D
224-DA
N
2D
212-CA
2D
212-CB
2D
211-DB
6D
216-EB
FP6
2D
ASI 009.1
211-DB
6D
211-EA
FP6
2D
ASI 009.1
224-CB
2D
ASI 009.1
223-DA
4D
ASI 009.1
211-FA
FP6
2D
211-FB
FP6
2D
211-FC
FP6
4D
ASI 009.1
216-FA
FP6
4D
216-FB
FP6
4D
RFI 389
222-AA
2D
ST
09-30-2025
O
ARCHITECT
FOFCALE
REN.
AT
ARN
NO.
SE
LICNE
C-27893
D
T
EC
HIT
ARC
DAVID SCHNEE
I
U
E
I
H
U
9
AS.O
A
FRANCN
4 0 8 0
H
I
N
S
L11
AL
E
CR
NDEN VA
,N I N G
CRAE
TCEI T
SC
S
N
N
G R O U P
7
S
5 06
C
07 18
2
P
R
A
O
90
A
EU
C
+
ER
4
SHEET TITLE AND NO.N
ISSUE DATE
PROJECT:
CA REG.
Project Arch.----
----
BID SET
FINAL PERMIT/CONFORM SET
04/30/2024
08/02/2024
22575-01
26 CIVIC CENTER
PLAZA
SANTA ANA
CA 92701
SANTA ANA
LIBRARY
RENOVATION
CITY OF SANTA ANA
26 CIVIC CENTER PLAZA
SANTA ANA, CA 92701
TN2.1-2
COMMUNICATIONS
FLOOR PLAN -
SECOND FLOOR1/8" = 1'-0"1 COMMUNICATIONS FLOOR PLAN - SECOND FLOOR
KEYNOTES
TKN0019 (2) 4" C.
TKN2012 SURFACE MOUNT IN AV RACK - COORDINATE WITH LOCATION OF RACK AS
SHOWN ON TA SHEETS AND WORK OF SECTION 27 41 16.
SHEET NOTE
1. STRUCTURED CABLING WORK OF THIS SHEET, UNLESS OTHERWISE NOTED, TO BE
PROVIDED UNDER THE WORK OF A SEPARATE “E-RATE”/FCC SCHOOLS AND LIBRARY
FUND CONTRACTOR USING PATHWAYS INSTALLED UNDER THE WORK OF THIS
PROJECT.
REV # DESCRIPTION DATE
ASI 009.1 07/15/2025
RFI 389 02/26/2026