Loading...
HomeMy WebLinkAboutdp93-13_watercert_1915sgrand.jpgp iI CITY OF SANTA ANA CERTIFICATE OF COMPLIANCE I� . Project Name: Project Number: DP Yt% J Project Location: f r�� �, t�oc Preliminary Project Documentation Submitted: (Check to indicate completion) } 1. Maximum Applied Water Allowance: �� ��.. gallons/year 2,,471j100 cubic feet/year 2. Estimated Applied Water Use: gallons/year 100 cubic feet/year *_ 2a. Estimated Amount of Water Expected from Effective Precipitation: gallons/year100 cubic feet/year * If the design assumes that a part of the Estimated Total Use will be provided by precipitation, the Effective Precipitation Disclosure Statement shall be completed and submitted with this Statement. 3. Estimated Total Water Use: % {-2 �-gallons/year ?'!1,'J 100 cubic feet/year t 4. Landscape Design Plan ',' 5. Irrigation Design Plan (indicate flow rate per valve) V 6. Irrigation Schedules a 7. Maintenance Schedules 8. Landscape Irrigation Audit Schedule 9. Grading Design Plan { r i! r ' 1'- 10. Soil Analysis Post -Installation Inspection: (Check indicating complaince) A. Plants installed as specified B. Irrigation system installed as designed _ dual distribution system for recycled water ^ minimal run off or overspray Note: To convert gallons per year to 100 cubic feet per year, divide gallons per year by 748. (748 gallons = 100 cubic feet) •- J ZOA 92-3 EXHIBiT3