HomeMy WebLinkAboutdp93-13_watercert_1915sgrand.jpgp iI
CITY OF SANTA ANA CERTIFICATE OF COMPLIANCE
I� .
Project Name: Project Number: DP Yt% J
Project Location: f r�� �, t�oc
Preliminary Project Documentation Submitted: (Check to indicate completion)
} 1. Maximum Applied Water Allowance:
�� ��.. gallons/year 2,,471j100 cubic feet/year
2. Estimated Applied Water Use:
gallons/year 100 cubic feet/year
*_ 2a. Estimated Amount of Water Expected from Effective
Precipitation:
gallons/year100 cubic feet/year
* If the design assumes that a part of the Estimated Total Use will be
provided by precipitation, the Effective Precipitation Disclosure
Statement shall be completed and submitted with this Statement.
3. Estimated Total Water Use:
% {-2 �-gallons/year ?'!1,'J 100 cubic feet/year
t 4. Landscape Design Plan
',' 5. Irrigation Design Plan (indicate flow rate per valve)
V 6. Irrigation Schedules
a 7. Maintenance Schedules
8. Landscape Irrigation Audit Schedule
9. Grading Design Plan { r i! r '
1'- 10. Soil Analysis
Post -Installation Inspection: (Check indicating complaince)
A. Plants installed as specified
B. Irrigation system installed as designed
_ dual distribution system for recycled water
^ minimal run off or overspray
Note: To convert gallons per year to 100 cubic feet per year, divide gallons per
year by 748. (748 gallons = 100 cubic feet)
•- J
ZOA 92-3
EXHIBiT3