Loading...
HomeMy WebLinkAbout10139618.pdfREVISIONS I BY PROPERTY LINE z J o � (EXIST&) REAR YARD e N o � s o a ' PROPOSED ADL7I TI ONS ^� e a el1 G/1 CT Jf I (EXIST& ) FRONT YARD PROPERT`t' L I NE 1510 W la`22TH 5T@ IONW W .. W t, SCALE lle/11+ i®oil 4 N 0 ALL HINDOVgS TO BE DUAL OLAZED. i r r 11 ;� i�tOTES; P 11i2�2 ANT C.nt7F ! S Ca�3C. 2[�® I SCALE.FLOOR !010��LANI FLOOR AREA v SHONER NGLOSURE aREEN 15Rn. e1 . RESIDENTIAL, COMMERCIAL' GUILLERMO PALAFOX 8050 E. Florence Ave. suite #27 Downey, CA. 90240 phone: (562) 928--5467 pager: (562) 409--3116 PROPOSED 1-STORY ADDITION Project for:. I AID W12TH SANTA ANA ul, UZ071 7 e C f3l L PLANS i"Cust be het 1 flho job mmske any chaRgso or m Permission from thea s Checked o ¢h' ,c+ sir '� Cifi� ''� I �' ¢g �£4��`+ .�e�'.� �: t .��s €95�&�'a���� 5��'. �'�"�:� NUT " provisions of ANY bg��Ordinanceor State) ° } � - E. C. . -, Drawn 0 We Issued vr V\- cL' Date 06/04/03 SHEET: EXI STI N& ...�.�..�._._._._. Rf= 0 D C=====-- PROPOSED OF SHEETS Wiliam168-4 OW, • OF COMPLIANCE: RESIDENTIAL (Page 1 of 3) CF-1R CERTIFICATE ' Project Title Date Building Permit Project C ` Plan Check/ Dart Docu nta�ti•+on Author `� �1 Telephone Field Check /Date Compliance Method (Package or Computer) Climate Zone. orcemcn envy sc Y GENERAL INFORMATION, Average Ceiling Height: ft Total Conditioned Floor Area `ft2 Conditioned Stab Floor Area /Addition Building Type: Single Family __ (check one or more) Multi-FatuityExisting-Plus-Addition (check Front Orientation: o / South / East / West / All Orientations input front orientation in degrees from True Noah and circle ode) Number of Stories Number of Dwelling Units: Floor Construction Type: Sla ised Floor (circle one or both) ` / z nes 2 4 8.15 Required RADIANT BARRIER uired in climat ) for this submittal' yes no BUILDING ENVELOPE INSULATION onFrame Type Cavity pera Sheathing Total R- Assembly Insulation Valuer U-Factors Locatioa/Cotmments e t teat, etc.} (attic, garage, yP 7__�ntm Type wd = wood Insulation . stl - steel R-Value R-Value Wall Z Wall • Roof Roof .. 7� ZLI_213 Floor Floor Stab Edge -fra=d wall That mects cpvitY-L-.Y�'" i Total - - insulation reoutrements for tht� scrilativc Poe knee. FENESTRATION Shading Devices !. U-Factor • : • , • '' ' " CI': '1'111' IC ,,k' *E OF C MPL DICE: SIDEN`I'IAI, (Pa ;c 2 of 3) CF-1R B� I PrirjL%:t Talc Date .Nu r. In; ut h�,:runic ur combined hydronie data under Water Healing Systems, except Design lieating Load. Distribution Iicating l:yuipme.-lit Minimum Type and Duct or Heat Pump l'ypc t!w.,,K e, heat' Efficiency Location Piping Thermostat Configuration ;1, ca .) AFUE or HSP ducts, attip, etc. R-Value T slit or ac c) Pk -Coolie g FN uiP meet Minimum Duct �__p__ Heat Pump Type (air conditioner, Efficiency Location Duct Thermostat Configuration ha►t eve . cootie SEER attic, etc. R-Value T lit or packto SEALED DUCTS and XVor Alternative Mea ure ❑ Sealed Ducts (ill climate zones) (lnsL"cr testing and certification and HERS rates' Sold verification required) J TXVs, readily accessible (climate zones 2 and 8-15 only) (Installer testing arxd certification and HERS Rater or field verification required) U Refrigerant Charge/Air Flow (climate zones 2 and 8-15 only) (Installer testing and certification and HERS Rater or Geld verifications required) OR , Alternative to Scaled Ducts and TXVs (see Package C or D Altemative Package Features for Project Climate Zone) Cumate Zone Window SHGC Window U-Factor SEER Heating WATER ]HEATING SYSTEMS Energy' External Rated' Tank Factor or 'tank Water Heater Distribution Number Input (kw Capacity Recovery Standby' Insulation Typq TXq in System orBtu/hr(gallons) Efficiency Loss % R-Value 1, For small gas storage water heaters (rated inputs of less than or equal to 75,000 Buoir), electric resistance, and heat puurp water hcatm, list Energy Factor. For large gas storage water heaters (rated input of &meaner than 75,000 Bui/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list rated input and recovery efficiencies. SPECIAL FEATURES (add extra sheets ifriccessarv). Package C and D: TXVs, Scaled Ducts, Radiant Barriers (see installation requirements for radiant barriers in Section 8.13 of the 2001 Residential Manual). Package C: thermal mass (thermal mass type, covering, thickness, and description). Compliance Forms August 2001 A-3 MAN ATORY MEASU RES CHECKLIST: RESIDENTIAL (Page 1 of 2) W-1R Note: Lowrise residential buildings subject to the St;utd:cnds must contain these measures regardless of the compliance approach used. Items marked with an asterisk (*) may be supersedccd by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorwratc l into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. .,,,•t;,,,,c (`lip,-V nr initial applicable boxes when completed or enter N/A if not applicable. DESCRIPTION DESIGNER ENFORCEMENT Building Envelope Measures: • § 150(a): minimum R-19 ceiling insulation. 77 § 150(b): Loosc fill insulation manufacturer's labeled R-Valuc. * § I wc): Minimum R-13 wall insulation in wood frarucd walls or aiuivalent U-F actor in metal frame walls does not !REly to exterior mass walls ._ • §I50(d): Minimum R-13 raised floor insulation in framed floors. §150(1) : Slab edge insulation - water absorption rate no greater than 0.3*/•, water vapor transmission rate no F_ Ecater than 2.0perm/inch. § 118: Insulation specified or installed =cts insulation quality standards. Indicate type and form .j. § 1,16-17: Fenestration Products, Exterior Doors, and Infrluatiou/Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. Fenestration products (except field -fabricated) have label with certiftcxi U-Factor, certified Solar Heat 2. F p ( `P Gain Coefficient (Sf IGC), and infiltration certification. 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed § 150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. § 150(f): Special infiltration barrier installed to comply with § 151 meets Commission quality standards. § 150(c): installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: door N a. Closeable metal or glass b. Outside air intake with damper and control c. Floc damper and control 2. No continuous burning gas pilot lights allowed Space Conditioning, Water Heating and Plumbing System Measures: § 110-§ 113: HVAC equipment, water heaters, showeritcads and faucets certified by the Commission. § 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. § 150(i): Setback thermostat on all applicable heating and/or cooling systems. ` / y § 150(j): Pipe and tank insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R-12 or greater. �j �" 2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater) 3. Back-up tanks for solar system, unftred storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 combined internal/external insulation. 4. All buried or exposed piping insulated in recirculating sections of hot water systems. 5. Cooling system piping below 550 F insulated. 6. Piping insulated between heating source and indirect hot water tank. Compliance Forms August 2001 A-S ADDENDUM TO: CERTIFICATE OF COMPLIANCE FORM(S) (Title 24, Energy Regulations) Project Plan Check J No, : ,. _ ��.�'� •, Project Address,Suite No,t.-�.��:.o G THIS FORM IS TO BE COMPLETED BY A QUALIFIED ENERGY CONSULTANT OTBEp-, THAN THE ENERGY DESIGNER I have reviewed the calculations and drawings for the above project and find both to be in compliance with the Energy Efficiency Standards and Administrative Requirements of the California Code of Regulations, Title 24, Parts 1 and 6., 1 understand that this' review was performed as representative for the enforcement agency, The City of Santa Ana Building Safety kiwi 'on, .— Date: Signature: t I • a• Print Name.�NN Mi1,�'�N Title:_' Cj fl Phone No.: Z-7 Company dame, Company Address: ` P Y �__0 981 VMA N D.A.T010' N1 EASURES CHECKLIST: RESIDENTIAL, (Page 2 of 2) MF-1 R Nate:: LwA m e buildings subject to the Standards must contain these measures regardless of the compliance approach used. ltcitns r,na; o ce +,:h an asterisk(*) maybe superseded by more stringent compliance requirements listed on the Certificate of this checklist is incorporated into the: permit documents, the features noted shall be considered by all parties as tru:uttnunn cuntpunent performance specifications for the mandatory measures whether they are shown elsewhere in the documents or out this checklist only. Instructions: Check or initial applicable boxes when completed or enter N/A if not applicable. DESCRIPTION DESIGNER ENFORCEMENT Space Conditioning, Water Heating and Plumbing -System Measures: (continued) * § 150(m): Ducts and Fans 1. All ducts and plenuius installedd, scaled and insulated to meet tic mquircrucnt of the 1998 CMC Sections 601, 603, 604, and Standa u 6-3; ducts insulated to a mininuim install d level of R4.2 or enclosed entirely in conditioned space. UP,_muigs shall be scaled with mastic, tape, aerosol sealant, or other duct -closure system that rncets the applicable requirements of UI. 181, UL 181A, or UL 181 B. If mastic or tape is used to seal openings grtatci than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not be used for conveying conditional air. Joints and seams of duct systems and their components shall not be �oculcd with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbauds. 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned �C�`%' 1G air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support ✓`l.� platforms shall not be compressed to cause reductions in the cross -sectional area of the ducts. 3. Joints and scams of duct systems and their components sha11 not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 4. Exhaust fan systems have back draft or automatic dampers. 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. 6. Protection of Insulation. Insulation, shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a eoatiag that is water retardant and provides shieldin8 from solar radiation that can cause degEadation of the material. § 114: Pool and Spa Heating Systems and Equipment 1. System is certified with 78% thermal efficiency, on -off switch, weatherproof operating instructions, no electric resistance heating and no pilot light. 2. System is installed with: a. At least 36" of pipe: between filter and heater for future solar heating. l b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch. § 115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light. (Exception: Non -electrical cooking applianecs with pilot < 150 BtuJhr J^ § 118 (f): Cool Roof material meet specified criteria Lighting Measures: § 150(k) l .: Luminaires for.gencral lighting in kitchens shall have lamps with an efficacy of 40 lumens/watt I or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily ���' s accessible lighdng control 1xincl at an entrance to the kitchen. § 150(k)2.: Rooms with a shower or bathtub must have either at Ieast one luminaire with lamps with an cf5cacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternatives to this t! /y fflol require-rnent allowed in § 150(k)2.; and incandescent recessed ceiling fixtures are IC (insulation cover) ' ` � aiTrovcd. Compliance Forme August 2001 aloft h. L OOA A -6i Plans drawn by: rrGl:'N G P. FOX P AF I G RE3IDE COA[MERCIAI:� GUILLERMO PALAFOX 8050 E. Florence Ave. suite #27 Downey, CA. 90240 phone: (562) 928-5467 pager: (562) 409-3116 'PROPOSED 1—STORY ADDITION Sheet Title: ENERGY FORMS Project for: Project: 1510 W 12-TH STo SANTA ANA Checked Ile,L6 0M � Drawn E. C. Date 06/04/03 SHEET: OF SHEETS a