HomeMy WebLinkAbout2112 N Alona St - Misc. PermitPlanning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-s800
w\rrw.santa-a n a. org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
soL-01 c8c 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIOENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the ce(ification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum '1 1" x 17
Project Address:
'' size. lf answerino NO to anv o fth o uestions, plan check shall be required.
lt Lo
V d rn tl'r$Contractor Company Name:
Contractor License Number:(0Z7eLlr(
2
3
YE7 Noatr
4a
da
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605,11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum ot 2-112inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
4
5
daatr
da
ds
ds
ds
6
7
8
o
10 trD
I certify under penalty of perjury under the laws of the State of Cali nia that the above is true:
Print Name: /'f at Ju | 1 t 17 ,,Signature
Date:Phone Number: J{I-z to..<-t 5
Rev: 11/19/2015
i
oY
o^ For(,tt{,Email Address
*,,SNTA
NAJryiffi