Loading...
HomeMy WebLinkAbout148577_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2007 California Building Code (CBC); MC = 2007 California Mechanical Code; PC = 2007 California Plumbing Code; EC = 2007 California Electrical Code; T = Table; ICC = International Code Council.All items apply noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.To the right of each correction please indicate the sheet number and detail or note number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following prior to building permit issuance:Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.Public Works Agency approval (647-5039).Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper.For roof covering specify:Roof slope(s) of all areas on the roof plan. (1507) Wall covering shall be cement plaster, tile or approved equal to 70 inches above drain at showers or tub with showers. Materials other than structural elements shall be moisture resistant. Glass enclosure doors and panels must be labeled Category II. Swing door outward. Net area of shower receptor shall be not less than 1,024 sq. in. of floor area, and encompass 30-inch diameter circle. (PC411.7)Show location(s) of hard-wired smoke detector with a battery back up in each sleeping room and at a point centrally located in the corridor or area giving access to each sleeping area: a detector shall be located at each story and basement, on the upper level of split level stories and both levels if sleeping area is on lower level; a detector shall be located in close proximity to the stairway when sleeping rooms are on the upper level. (Battery-operated smoke detector permitted in existing construction only.) Refer to CBC Section 907.2.10 and the CA Fire Code. Glass and glazing shall be in accordance with CBC Chapter 24. Note on the drawings all windows and doors having glazing. Indicate the type and thickness of each light of glazing on the drawings showing compliance with CBC Sections 2403, 2404 and 2406. The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (A106.1):All plumbing walls are to be framed with a minimum of 6" studs. The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.The energy plan check consultant must also complete the attached “Energy Conservation Plan Check Consultant Qualification Statement”. Note on the drawings required construction inspections. The engineer or architect in responsible charge of the structural design work shall include in the construction documents the following:Other structural inspections required by the engineer or architect in responsible charge of the structural design work.Special inspections required by ICC Research Reports.