PLAN CHECK NO:
PROJECT ADDRESS:
3210 S Croddy Way
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Robert Ekholm
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2007 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- School District Compliance Certificate; a copy of the building permit application, signed by the plan check
engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance
- Show on the plans:
- Complete legal description
- Assessor’s Parcel Number
- Occupancy Classification(s)
- Type of Construction
- Number of stories/mezzanines and building height in feetOccupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers.Occupancies using hazardous materials are subject to special requirements. It is the applicant’s/owner’s responsibility, PRIOR TO SUBMITTAL, to make this known to the Building, Planning, or Fire Departments.When there has been a change in use or occupancy classifications, drawings shall show compliance with the CBC requirements for the new classifications. Reference CBC Section 3406.Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.The length of a common path of egress travel in Group B, F and S occupancies shall not be more than 100’, provided that the building is equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.1. CBC Section 1014.3.CBC Section 1016.1. Travel distance limitations. Exits shall be so located on each story such that the maximum length of exit access travel, measured from the most remote point within a story to the entrance to an exit along the natural and unobstructed path of egress travel, shall not exceed the distances given in Table 1016.1. Provide drawings to show compliance.Provide floor plan of existing building to show location of all existing exit doors and compliant exiting, common path, and traveling distance from proposed mezzanine to public way on the drawings.CBC Section 1016.1. Where the path of exit access includes unenclosed stairways within the exit access or includes unenclosed exit stairways as permitted in Section 1020.1, the distance of travel on such means of egress components shall also be included in the travel distance measurement. The measurement along stairways shall be made on a plane parallel and tangent to the stair tread nosing in the center of the stairway.Table 1016.1 Exit Access Travel Distance:
OCCUPANCYWITHOUT SPRINKLERWITH SPRINKLERSYSTEM (feet)SYSTEM (feet)
A, E, F-1, I-1, M, R, S-1200250b
B200300c
F-2, S-2, U300400c
Stairways shall show compliance with CBC Sections 1009 and 1133B.4 including applicable disabled accessibility requirements.
- Refer to the attached stairway handout; show compliance on the drawings.CBC Section 1133B.4.4, The upper approach and the lower tread of each interior stair shall be marked by a strip of clearly contrasting color at least 2” wide placed parallel to and close to (not more than 1” from) the nose of the step or landing to alert the visually impaired. The strip shall be of material that is at least as slip-resistant as the other treads of the stairs.CBC Section 1133B.8.2, Areas with a vertical clearance of less than 80” must have a barrier to warn blind or visually impaired persons.Provide handrail details on the drawings showing compliance with CBC Section 1009.10, 1012, and 1133B.4.1.
- Handrails shall be 34 to 38” above the nosing of treads.
- Handrails shall extend a minimum of 12” beyond the top nosing, and shall extend a minimum of 12” plus the
tread width beyond the bottom nosing.
- Handrails projecting from a wall shall have a space of 1½” between the wall and the handrail.
- The handgrip potion of handrails shall not be less than 1¼” nor more than 1½” cross-sectional dimension or
the shape shall provide an equivalent gripping surface. The handgrip portion of handrails shall have a smooth
surface with no sharp corners. Any wall or other surface adjacent to the handrail shall be free of sharp or
abrasive elements. Edges shall have a minimum radius of 1/8”.Refer to red marks on the drawings for additional plan check comments.Proposed operable gate located on the mezzanine floor does not comply withCBC Section 1013.3. Provide a lock at the gate to keep the locked at all times except for loading and un-loading. Revise drawings to show compliance. Submit structural calculations for design and justification and compliance with CBC Sections 1013 and 1607.7.CBC Section 1013.3. Open guards shall have intermediate rails or an ornamental pattern such that a sphere 4” in diameter cannot pass through.
- The open space between the intermediate rails or ornamental pattern of guards in commercial and industrial-type
occupancy areas, which are not accessible to the public, may be such that a sphere 12” cannot pass through.
- The triangular opening formed by the riser, tread, or bottom elements of a guard at the open side of a stairway
may be of such size that a sphere 6” indiameter cannot pass through. Provide a note on the drawings, clarifying if this occupancy is accessible to public for use of this exception. It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B:
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsPriority shall be given to those elements that will provide the greatest access in the above order.Valuation of proposed project is calculated as $49658.40. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Section 1134B. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.Refer to the attached handout for Exterior Routes of Travel. Revise drawings to show compliance.Refer to the attached parking handout for additional plan check comments. Revise the drawings to show compliance.Refer to the attached sanitation facility handout for additional plan check comments. Revise plans to show compliance.Indicate the use of proposed mezzanine area on the drawings.Provide drawings to show clear height of mezzanine and 1st floor area under mezzanine.CBC Section 1603.1.4, Wind design data. The following information related to wind loads shall be shown, regardless of whether wind loads govern the design of the lateral-force-resisting system of the building:
- Basic wind speed (3-second gust), miles per hour (km/hr).
- Wind importance factor, I, and occupancy category.
- Wind exposure. Where more than one wind exposure is utilized, the wind exposure and applicable wind
direction shall be indicated.
- The applicable internal pressure coefficient.
- Components and cladding. The design wind pressures in terms of psf to be used for the design of exterior
component and cladding materials not specifically designed by the registered design professional.CBC Section 1603.1.5, Earthquake design data. The following information related to seismic loads shall be shown, regardless of whether seismic loads govern the design of the lateral-force-resisting system of the building:
- Seismic importance factor, I, and occupancy category.
- Mapped spectral response accelerations, SS and S1.
- Site class.
- Spectral response coefficients, SDS and SD1.
- Seismic design category.
- Basic seismic-force-resisting system(s).
- Design base shear.
- Seismic response coefficient(s), CS.
- Response modification factor(s), R.
- Analysis procedure used.CBC Section 1603.3, Live loads posted. Where the live loads for which each floor or portion thereof of a commercial or industrial building is or has been designed to exceed 50 psf, such design live loads shall be conspicuously posted by the owner in that part of each story in which they apply, using durable signs. It shall be unlawful to remove or deface such notices.Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for:
- Guard(s). CBC Sections 1013 and 1607.7. See sheet S-5.4 for rolling gate/guard.