HomeMy WebLinkAbout155019_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2007 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceIndicate material/s name to be stored in the warehouse area.Pending item # 7 above. Occupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers.Pending item # 7 above. Occupancies using hazardous materials are subject to special requirements. It is the applicant’s/owner’s responsibility, PRIOR TO SUBMITTAL, to make this known to the Building, Planning, or Fire Departments.Pending item # 7 above. When there has been a change in use or occupancy classifications, drawings shall show compliance with the CBC requirements for the new classifications. Reference CBC Section 3406.Occupant load is calculated as follows:
- Storage 17 Persons-Office area not determined at this time. Drawings are too small.Table 1016.1 Exit Access Travel Distance:Show location of exit access path of travel on the drawings and remove racks located in front of exit doors.
OCCUPANCYWITHOUT SPRINKLERWITH SPRINKLERSYSTEM (feet)SYSTEM (feet)
S-1200250b
B200300cCBC Section 1133B.6. Every portion of every building in which are installed merchandise, equipment, or similar materials shall be provided with aisles leading to an exit. Every aisle shall not be less than 36” wide if serving only one side, and not less than 44” wide if serving both sides.CBC Section 1707.6, Storage racks and access floors. Periodic special inspection is required during the anchorage of access floors and storage racks 8’ or greater in height in structures assigned to Seismic Design Category D.Note on the drawings locations and inscriptions of 50 square inch minimum size permanent plaques installed in conspicuous locations, showing the maximum permissible unit load in clear, legible print.Lower portions of posts exposed to damage by forklift trucks or other moving equipment shall have protective devices. If not so protected, at the option of the building official, the rack structure may: (1) be designed to maintain its full design load capacity at allowable stresses with the exposed post capacity reduced by one-half or (2) be designed to maintain its full design load capacity at 50 percent increased allowable stresses with the exposed post assumed to have no carrying capacity.