Loading...
HomeMy WebLinkAbout156035_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2007 California Building Code (CBC); MC = 2007 California Mechanical Code; PC = 2007 California Plumbing Code; EC = 2007 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.Dimension roof overhangs showing compliance with CBC Section 704. Specify minimum 1/4 inch per foot roof slope for drainage or design to support accumulated water. (1503, 1611, and PC) (For cricket) Bathrooms, laundry rooms, water closet compartments and similar rooms shall be mechanically ventilated in accordance with the Mechanical Code. (1203.4.2.1) The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans. -Signed Energy Efficiency Documents must be printed on the plans. -Also, submit 2 copies of signed Energy Efficiency calculations. -The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations (CCR), Title 24, Part 1 (Administration) and Part 6 (2008 California Energy Code). The plan check consultant must sign documentation certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency. -The corrected/final drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. For plywood roof diaphragms, specify thickness, grade, panel span rating, and nailing schedule. (2305.2, 2305.3, 2306.9. and T2306.4.1) Note on the plans: "Roof diaphragm nailing to be inspected before covering. Face grain of plywood shall be perpendicular to supports." Provide shear wall at the four side of the living room or provide calculation to justify lateral load.