HomeMy WebLinkAbout157996_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2007 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Provide minimum 12” clearance at door #19 on sheet T-4.Provide min 30” x 48” clearance the front of the sink in the bathroom.On the first floor rearrange toilet and sink to be able to be in compliance with H/C accessibility.Show grab bars for the bathroom on the first floor.Provide min 48” clearance at the hallway to the restroom #112.Show relocated sink next to the fan coil is in compliance with H/C accessibility.Provide min 48” clearance at the folding security door to display.Show min 7” height clearance at the new cased opening.On the mezzanine floor plan the location of the doors at the open office is different from original plan, please clarify.At the second floor area show min 48” clearance from the new void area to the door at office #210.How door #19 at sheet T-4 is in compliance with H/C accessibility.Clarify , why bathroom #204 on second floor on sheet T-4 is different from original plan.On the second floor show minimum 48” clearance from the new void area to the at office #210.Provide detail and support for new window # 9 on second floor.Unable to find size of header at detail F/TD1.Provide stud size and spacing for detail F/TD1.Provide bottom support detail for the pass thru counter.Complete all soffit and furred out wall details. Provide complete detailing, including number, type, location of fasteners and how attachment is made to the building structure. Show compliance with CBC Section 803.Provide attachment detail for marble veneer.