HomeMy WebLinkAbout158589_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2007 California Building Code (CBC); MC = 2007 California Mechanical Code; PC = 2007 California Plumbing Code; EC = 2007 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper. For roof covering specify:
-Roof coverings shall have at least a Class "C" rating. (1505)
Show how dwelling is provided with comfort heating facilities capable of maintaining a room temperature of 68oF at a point of 3 feet above the floor in all habitable rooms. (1204)
Show Radiant Barrier, Cool Roofing, Duct Ceiling as required by the 2008 California Energy Residential Manual for prescriptive Package D.
Show roof sheathing thickness and nailing schedule.
The size of ridge board, valley or hip members shall not be less than the cut end depth of the rafter. (2308.10.4)
Show location of underfloor access crawl hole (18 x 24 inches). For existing house. (1209.1)
Show floor sheathing thickness and nailing schedule.
Foundation and floor slabs on expansive soil shall conform as follows, unless approved soil report indicates soil is not expansive by the Expansion Index Test method, or recommends other details (1805.8 and A104.1):
-Two continuous No. 4 bars 4 inches from bottom and two continuous No. 4 bars 4 inches from top of
foundation.