HomeMy WebLinkAbout159763_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2007 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.Provide path of travel from H/C parking to the altered areas.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceCBC Section 1008.1.8, Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.” (Card reader at the room adjacent to elevator lobby is not allowable. )Delayed Egress Locks shall show compliance with CBC Section 1008.1.8.6, Approved, listed, delayed egress locks shall be permitted to be installed on doors serving any occupancy except Group A, E, and H occupancies in buildings that are equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 and an approved automatic smoke detection system installed in accordance with Section 907, provided that the doors unlock in accordance with Items 1 through 9 below. A building occupant shall not be required to pass through more than one door equipped with a delayed egress lock before entering an exit. Delayed egress devices shall conform to all of the following:
- The doors unlock upon actuation of the automatic sprinkler system or automatic smoke detectionsystem.
- The doors unlock upon loss of electrical power to any of the following:
The egress-control device itself.
The smoke detection system.
Means of egress illumination as required by CBC Section 1006.
- The door locks shall have the capability of being unlocked by a signal from a switch located in anapproved
location.
- The initiation of an irreversible process which will release the latch in not more than 15 seconds when a force
of not more than 15 pounds is applied for 1 second to the release device. Initiation of the irreversible process
shall activate an audible signal in the vicinity of the door. Once the door lock has been released by the
application of force to the releasing device, relocking shall be by manual means only. [SFM] The time delay
established for each egress-control device shall not be field adjustable. For applications listed in CBC Section
109.1 regulated by the Division of the State Architect – Access Compliance, see Chapter 11B, CBC Section
1133B.2.5. Exception: In facilities housing Alzheimer’s or dementia clients, a delay of not more than 30
seconds is permitted
- A sign shall be provided on the door located above and within 12” of the release device reading: “KEEP
PUSHING. THIS DOOR WILL OPEN IN 15 [30] SECONDS. ALARM WILL SOUND.” Sign lettering shall be
at least 1” height and shall have a stroke of not less than 1/8”.
- The unlatching shall not require more than one operation.
- Regardless of the means of deactivation, relocking of the egress-control device shall be by manual means
only at the door.