PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2007 California Building Code (CBC); MC = 2007 California Mechanical Code; PC = 2007 California Plumbing Code; EC = 2007 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
-Public Works Agency approval (647-5039).
Verify if the wall is being removed in master bedroom is bearing or non bearing wall.
In every sleeping room below the fourth story and in the basements of dwelling units, at least one openable emergency escape and rescue window or door shall open directly into a public street, pubic alley, yard or exit court, meeting all of the following (1026):( For new bedroom on second floor)
CAUTION: Using minimum clear openable height with the clear openable width will yield only 3.3 square feet and not the minimum 5.7 square feet required. Be especially careful with double-hung windows. Also, when the emergency escape window is below ground level refer to CBC Section 1026.5 for additional requirements.
-An openable area of not less than 5.7 square feet (5.0 square feet for ground-floor openings);
-A minimum 24 inch clear openable height;
-A minimum clear openable width of 20 inches;
-A sill height not over 44 inches above the floor.
-EXCEPTION: When approved by the Santa Ana Fire Department Group R, Division 1, hotel
occupancies provided with a monitored automatic sprinkler system may have operable windows
restricted to a maximum 4-inch open position.Show the location(s) of hard-wired smoke detector(s) with a battery back up in each sleeping room and at a point centrally located in the corridor or area giving access to each sleeping area. A detector shall be located at each story and basement, on the upper level of split level stories, and both levels if sleeping area is on lower level; a detector shall be located in close proximity to the stairway when sleeping rooms are on the upper level. (Battery-operated smoke detectors are permitted in existing construction only.) Refer to CBC Section 907.2.10 and the CA Fire Code.
Specify the header size at door, window and other openings over 4 ft. wide in bearing walls. (2308.9.5,6,7)
Provide ICC report for new sky light.