Loading...
HomeMy WebLinkAbout158852_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: APPLICABLE CODE: 2007 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings (667- 3600) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Provide a wall legend indicating whether the wall is: - Existing, new, or to be removed, the legend is not clear. Sheet A341.Please clarify the door next to fitting room is new or existing , if it is new provide construction detail.Provide detail to show new infill in exterior wall is I-Hr fire rated.Provide construction detail for full height wall in starbucks on sheet A311.Provide plywood on both sides of the low wall in starbucks.Sign shall be under separate permit.Show how the bulk head at starbucks detail 8/A311 will be supported laterally and vertically.Provide weight and attachment detail for food service menu board on detail 4/A311.Provide the size of the gate in starbucks and clarify if it has latch and closure.Identify new and existing bulk heads, show how it is being supported laterally and vertically.Show cashier at food area and star bucks are in compliance with H/C accessibility.Please verify if the walk in cooler/ freezer is prefabricated or custom.If walk in cooler is prefabricated provide ICC report , if it is custom please provide calculation engineering with complete construction plan.Provide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members.Complete all soffit and furred out wall details. Provide complete detailing, including number, type, location of fasteners and how attachment is made to the building structure. Show compliance with CBC Section 803.Exit illumination and exit sign requirements in accordance with CBC Section 1011 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.CBC Section 1011.1. Provide a directional exit sign at changes in exiting direction.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5. (Provide for the entire length.) Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5.Show height of the fitting room desk.CBC Section 1117B.8, Fitting and Dressing Rooms: - Every accessible dressing room shall have a 24” by 48” bench fixed to the wall along the longer dimension. The bench shall be mounted 17 to 19” above the finish floor. Clear floor space shall be provided alongside the bench to allow a person using a wheelchair to make a parallel transfer onto the bench. The structural strength of the bench and attachments shall comply with Section 1115B.8. The minimum clear space within the room shall be 60” width and length. No door shall encroach into the required space.Foam plastic installed in a maximum thickness of 10” in cooler and freezer walls to comply with Section 2603.4.1.2 of CBC. For foam plastic having a thickness that does not exceed 4” refer to Section 2603.4.1.3 of CBC. Provide complete wall construction detail to show compliance. Note ICC Research Report Number on the drawings for Walk-in cooler and or freezer.Provide complete structural calculations and drawings for suspended ceiling systems showing compliance with CBC Sections 711.3.1, 803.9, 1613, and 1705 (special inspections) and ASTM C635 and ASTM C636.The reflected ceiling plan and details must show compliance with CBC Sections 711.3.1, 803, 1613, and 1705 (special inspection) for suspended ceiling systems.Note ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)Please clarify notes on detail 8/A501.Provide size of the opening for each new roof top unit.Please provide connection spacing for detail 14A/S141.On entry framing plan 3/S141, shows steel roof framing, On partial roof framing 1/S141 shows wood framing and glulam beam, please clarify.