HomeMy WebLinkAbout162111_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.Clearly indicate the scope of work under this building permit application:
- Include new demising wall to be included in scope of project on permit applicationThis review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceCBC Section 1122B.1. Where a single counter contains more than one transaction station, such as (but not limited to) a bank counter with multiple teller windows or a retail sales counter with multiple cash register stations, at least 5 percent, but never less than one, of each type of station shall be located at a section of counter that is at least 36” long and no more than 28 to 34” high.Provide complete structural calculations and drawings for suspended ceiling systems showing compliance with CBC Sections 711.3.1, 803.9, 1613, and 1705 (special inspections) and ASTM C635 and ASTM C636.Provide a complete suspended ceiling system plan and section detail showing the following:
- Provide “Heavy Duty” rated ceiling system.
- ICC Research Report number for the suspended ceilingTenant improvements in the MainPlace Mall shall show compliance with the following special provisions and CBC Section 402:
- Note on drawings: Duct and smoke removal system modification is not allowed and shall be in compliance
with the “Code Analysis and Fire Protection and Life Safety Concept.”
- CBC Section 402.4.2, Number of means of egress. When the distance of travel to the mall exceeds 75’ within
the public area of a tenant space or when the occupant load served by the exit to the mall exceeds 49, not
less than two means of egress shall be provided. The occupant load of a public sale area shall be computed
at 30 square feet per occupant. Occupant loads for other areas shall be computed in accordance with Table
Number 1004.1.1. Show travel distance is less than 75 feet on plans.Note On Drawings: (Santa Ana Police Department Requirement)SANTA ANA POLICE DEPARTMENT REQUIREMENTS FOR MAINPLACEOVERHEAD/ROLLING GRILLESECURITYORDINANCE REQUIREMENTSTUBES ARE TO BE “DOUBLE TUBED” (NO MORE THAN ½” APART) AND CONSTRUCTED OF ½” STEELOR BE STEEL REINFORCED TUBES WITHIN 40” OF ALL LOCKING HARDWARE. PERFORATED SLATSCAN BE USED INSTEAD OF THE AFOREMENTIONED AS LONG AS THEY ARE CONSTRUCTED OF MINIMUM 20 GA STEEL.LOCKING MECHANISM TO BE STEEL SLIDEBOLTS BOTH SIDES OF DOOR. SLIDEBOLTSTO EMBED AMINIMUM OF ½” INTO THE RECEIVING GUIDE.CURTAIN GRILLES ARE NOT TO BE UTILIZED.FIRE DEPARTMENT REQUIRED EMERGENCY RELEASE MUST BE LOCATED NO MORE THAN 40” FROM THE EXTERIOR SIDE OF THE GRILLE.THE LOCKING MECHANISM’S INTERIOR THUMBTURN MUST BE SHIELDED BY AN INTERIOR HOOD TO PREVENT ITS MANIPULATION FROM THE EXTERIOR SIDE OF THEGRILLE.Coordinate location of key note for new demising wall on floorplanProvide engineered plans and calculations for suspended drywall ceiling system. Reference to detail is invalid.Provide details for drywall soffit framing and constructionRevise restroom layout to provide 18” clear space for the water closet at slanted wall location. The wall creates different clear spaces between wall and water closet however 18” is required.