HomeMy WebLinkAbout162813_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper. Carbon monoxide alarms combined with smoke alarms shall comply with both sections R314 and section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms.All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. (CRC R314.3) Smoke alarms shall be installed in the following locations:
- In each sleeping room.
- Outside each separate sleeping area in the immediate vicinity of the bedrooms.
- On each additional story of the dwelling, including basements and habitable attics but not
including crawl spaces and uninhabitable attics. In dwellings or dwelling units with split
levels and without an intervening door between the adjacent levels, a smoke alarm
installed on the upper level shall suffice for the adjacent lower level provided that the lower
level is less than one full story below the upper level.
- When more than one smoke alarm is required to be installed within an individual dwelling
unit the alarm devices shall be interconnected in such a manner that the actuation of one
alarm will activate all of the alarms in the individual unit.Provide a complete full-height section and details of stairway showing: (CRC R311.7)
- Maximum rise of 7¾ inches and minimum run (tread) of 10 inches.
- Minimum width of 36 inches. For plywood roof and floor diaphragm specify thickness, grade, T&G edges, panel span rating, nailing schedule and required blocking and panel layout pattern.Alterations to existing buildings using the Prescriptive approach shall meet the applicable requirements of Sections 110 through 119, and 150(a) through (p),for the altered area and new equipment. (2008 CESC 152(b)) Alterations that add fenestration area to a building shall be limited to a maximum 0.40 U-factor and the Solar Heat Gain Coefficient for new fenestration product as specified in Alternative component Package D. (Tables 151-C)The CF-1R form is to be signed by the Document Author and Building Designer and incorporated into the plans. (T24-1-10.103(a) 2A)The Mandatory Measures Checklist (MF-1R) form, showing compliance with 2008 CESC Section 150, is to be incorporated into the plans. (T24-1-10.103(a) 2A)The maximum U-factor for glazing is 0.40 for Climate Zones 6 thru10 for Package D. Revise plans to show compliance.The minimum Solar Heat Gain Coefficient (SHGC) is 0.4 for Climate Zones 6 thru 10 for Package D.Revise framing plans to indicate insulation for walls R=13, ceiling R=30, and raise floor R=19 climate zone 8. (2008 CESC 150) Show ridge board, rafters and ceiling joists on the framing plan.Show roof covering has minimum class C rating.Provide shear wall between the garage and new addition.Provide ½ “ type X gypsum board at the garage side wall.Provide shear wall plywood thickness and nailing schedule.Provide hold down at the end of the shear walls.3 ½”x 11 ¼” PSL beam exceeds allowable deflection design, provide 3 ½” x 14” PSL beam or provide engineering to justify.Front elevation doesn’t match framing plan, please clarify.