REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700).
- Police Department approval on the corrected/final set of drawings (647-5840).
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B, Chapter 11B: (Provide drawings to show compliance).
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsPriority shall be given to those elements that will provide the greatest access in the above order.Disables compliance form shows existing stairway to be modified to comply with accessibility. Provide drawings to show items that are modified for compliance. Structural modification requires calculations for design and justification. Please see item below.Valuation of proposed project is calculated as $107,700.00 A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order as noted in CBC Section 1134B. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.Provide structural calculations and drawings stamped and signed by a California licensed architect or registered civil engineer for overturning analysis of existing shear walls where modified. Show location and capacity of existing holowns as well.