HomeMy WebLinkAbout163031_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceChange type of the construction to reflect VB-spk.Please fill out attached handicap compliance form.Show existing floor plan and identify all area on the floor plan.All doors require a level floor landing on each side in accordance with CBC Sections 1008.1.4, 1008.1.5, 1008.1.6, and 1133B.2.4 and CBC Figures 11B-26A and 11B-26B. Provide typical door threshold details and details of change in floor covering material. (For the back door)The width of the level area on the side to which the door swings out shall extend 12” past the strike edge of the door .CBC Sections 1133B.2.4 and 1133B.2.4.1, Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.CBC Section 1133B.2.5, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”CBC Sections 1115B and 1210. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.Show cash register is in compliance with Handicap accessibility.The space between two consecutive door openings in a vestibule , serving other than a required exit shall provide a minimum of 48” of clear space from any door opening into such vestibule when the door is positioned at an angle of 90 degrees from its closed position.1133.B.2.4.4Show height of the storage racks. For storage racks over 6feet high provide anchorage detail , for storage over 8’ high , provide engineering calculation and attachment details.Provide details on the drawings for the seismic restraint of water heater .Provide detail for hard-lid ceiling in the bathroom.Provide complete structural calculations and drawings for suspended ceiling systems showing compliance with CBC Sections 711.3.1, 803.9, 1613, and 1705 (special inspections) and ASTM C635 and ASTM C636. (OR SEE COMMENT 14-16)Provide a complete suspended ceiling system plan and section detail showing the following: - Vertical supports - Seismic wires - Seismic strut/Compression strut - Perimeter wires - Separate fixture wires for lights and mechanical devices - ICC Research Report number for the suspended ceilingThe reflected ceiling plan and details must show compliance with CBC Sections 711.3.1, 803, 1613, and 1705 (special inspection) for suspended ceiling systems.Note ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)Show weight of existing and new heat pumps on the drawings.