Loading...
HomeMy WebLinkAbout164577_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance - Information Technology equipment rooms require a completed electrical plan check prior to issuance of the building permit to ensure compliance with the 2007 California Electrical Code (CEC) Article 645, Electronic Computer/Data Processing Equipment. CEC Article 645 may require fire-rated walls, floors, and ceilings for the computer room(s). For additional information, contact Mr. Scott Davis, Electrical Plan Check at (714) 647- 5822.Show path of travel from parking and public way to the building.Please fill out attached handicap compliance form.Provide complying exiting plan for the “reminder” area. Note the use of adjacent units.( For suite 610)CBC Section 1017.4, Air movement in corridors. Corridors shall not serve as supply, return, exhaust, relief or ventilation air ducts when required to be fire-resistive rated in accordance with Table 1017.1.Note on the drawings CBC Section 715 requirements for a pair of doors installed in a one-hourcorridor wall. - A labeled assembly having a fire-protection rating of not less than 20 minutes. - Self-closer or automatic-closer actuated by a smoke detector. - Automatic flush bolts, the door leaf having the automatic flush bolts shall have no doorknob or surface- mounted hardware. The unlatching of any leaf shall not require more than one operation. - Full mortise hinges – three minimum. - Tight-fitting clearances and provided with a gasket so installed as to provide a seal where the door meets the stop on both sides and across the top. Clearances for a pair of swinging doors shall be as follows: With a minus 1/16” tolerance – 1/8” along the top, 1/8” along the hinge and latch jambs, 1/8”along the meeting edge of the doors, and ¼” at the bottom of the doors. - An overlapping astragal extending the full height of the doors is required along the meeting edges of the doors. A coordinating device is also required to insure proper closing.”6th FloorProvide square feet and occupant load for suite 610 and show number of required exits. Provide exit signs and tactile exit sign for suite 610.Side lights shall be tempered.Provide ICC report number for fire caulking in detail C1/AD-1.Provide minimum 12 “ clearance to the strike edge of door #03.Provide minimum 18“ clearance to the strike edge of door #04.Provide complete detail for pass through window to show how it is being supported from top and bottom, also framing detail for the opening.Please clarify if T-bar ceiling is new or existing .On floor plan it shows existing H/C accessible bathroom , sheet POT-6 shows bathroom is being remodeled , please clarify.8th FloorProvide minimum 12 “clearance to the strike edge of door # 33.Provide minimum 12 “clearance and 18” to the strike edge of door # 47.Provide minimum 36 “ opening at the entrance of the work room.Clarify if reception desk in room # 801 is new or existing, if it is new show compliance with H/C accessibility.Clarify if the ceiling lid in conference room and reception area is new or existing.10th floorProvide minimum 12 “ clearance to the strike edge of door # 86.Provide elevation for full height store front.Provide complete detail to show how the store front is being supported at the top and bottom.Show thickness of glazing for store front and show if it is tempered.Provide elevation for 60” low wall with new store front on the top.Provide engineering to show how 60” low wall will store front will be supported.