REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2010CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit4corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.Please return marked up set of drawings with corrections.Submit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application including architectural and structural fees. The plan check engineer to review the contract price for acceptance based of fair market value of proposed construction work. The valuation is estimated to be $75000.00.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- County of Orange Health Department approval on the corrected/final set of drawings (667- 3600)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceInterior floor finishes shall show compliance with CBC Section 804.Posting of occupant load. Every room or space that is assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.Note on the floor plan the use and occupancy load of each room and/or area. Relate each use to a CBC Table item. Note occupant loads which are the greater number based on CBC Section 1004 and Table 1004.1.1 or the actual number of occupants.Panic hardware shall comply with CBC Section 1008.1.9. Panic hardware shall be provided as required by CBC Section(s): - Hardware complying with exiting and disabled accessibility requirements (CBC Sections 1008.1.8 and
1133B.2.5)
- An Occupancy with an occupant count > 50. Refer to CBC section 1008.1.8.3, Item 2 for Exception.
- By the Fire Department The width of the level area on the side to which the door swings shall extend 24” past the strike edge of the door for exterior doors and 18” past the edge for interior doors. CBC Section 1126A.3.2.Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements. CBC Section 1133B.2.5.2.The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position. CBC Section 1126A.3.1. Please refer to red marks on the drawings.CBC Section 1133B.2.6, Required the bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous conditionRefer to the attached entrance/door handout. Revise the drawings to show compliance.Tactile exit signs shall be required at the following locations:
- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”Refer to the attached parking handout for additional plan check comments. Revise the drawings to show compliance. Provide cross reference from each applicable detail to site plan or floor plan.Refer to the attached handout for Exterior Routes of Travel. Revise drawings to show compliance.Provide complete structural calculations and drawings for suspended ceiling systems showing compliance with CBC Sections 711.3.1, 803.9, 1613, and 1705 (special inspections) and ASTM C635 and ASTM C636. The reflected ceiling plan and details must show compliance with CBC Sections 711.3.1, 803, 1613, and 1705 (special inspection) for suspended ceiling systems.Provide a complete suspended ceiling system plan and section detail showing the following:
- Vertical supports
- Seismic wires
- Seismic strut/Compression strut
- Perimeter wires
- Separate fixture wires for lights and mechanical devices
- ICC Research Report number for the suspended ceilingNote ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)Restaurants where food is sold to be consumed on the premises require disabled accessible public sanitation facilities for each gender when the customer occupant load exceeds ten, or when the number of employees exceeds 4. California Plumbing Code (CPC) Section 412.3 and CBC Table 4-1 (See Footnote 16) and CBC Section 1115B.Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 1115B and the California Plumbing Code.CBC Sections 1115B and 1210. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.Proposed toilet rooms do not show full compliance . Please refer to mark up set of drawings and attached handouts. Revise drawings to show compliance.CBC Section 1607.7. Provide complete grab bar details on the drawings showing compliance with CBC Section 1115B.8 including structural strength to support a 250 pound point load.CBC Section 1115B.4.3 Item 4. Note on the drawings hot water and drain pipes under lavatory shall be Ensure sanitary facilities comply with CBC Section 1115B.8.1 and that the bottom of the mirror is no higher than 40” from the floor.Exit illumination and exit sign requirements in accordance with CBC Section 1011 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.CBC Section 1006, Requires means of egress from all occupied parts of the building be provided with at least 1’ candle of light at floor level. Show compliance on the drawings.Tactile exit signs shall be required at the following locations:
- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B: All details must be cross reference and showing actual conditions. Typical details are not acceptable. Enlarge accessibility details to show compliance.
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms (Show minimum of 48” hall way providing access to toilet rooms)
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsRefer to the attached parking handout for additional plan check comments. Provide a copy of the note from Planning Department to clarify that there are no parking provided for existing building.Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use.
Note on drawings:
- Provide mechanical ventilation for each area/room in accordance with the 2010 California Mechanical Code.Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of use.
Note on drawings:
- CBC Section 1205.3, Artificial light. Artificial light shall be provided that is adequate to provide an average CBC Section 1133B.6. Every portion of every building in which are installed seats, tables, merchandise, equipment, or similar materials shall be provided with aisles leading to an exit. Every aisle shall not be less than 36” wide if serving only one side, and not less than 44” wide if serving both sides.CBC Section 1110B.1.3, Check Stands CBC Table 11B-2:
NUMBER OF REGULARNUMBER TO BE
CHECKSTANDSACCESSIBLE
1 to 41Show location and size of accessible seating table in the dining room. Please note each type of seating must be provided with at least one accessible seating place. All dining, banquet, and bar facilities shall be made accessible to persons with disabilities as provided in CBC Section 1104B.5. At least 5%, but not less than one of the seating spaces in each functional area is accessible as follows:
- Provide a minimum 30” x 48” wheelchair clear floor space.
- Provide knee space at tables at least 27” high, 30” wide and 19” deep.
- Provide height of tables between 28” – 34” from the floor ground.
- Provide access to accessible seating space(s) by aisles with a minimum of 36” in width.Counters where food or drink is served shall show compliance with the following:
- Top of counter is between 28” – 34” above the finish floor.
- Knee clearance to be a minimum 27” high, 30” wide, and 19” deep.
Exception: Knee clearance is not required at checkout counters or service counters.
- Clear floor space a minimum of 30” by 48”.
- Clear floor space adjoins an accessible route..If applicable, note ICC Research Report Number on the drawings for Walk-in cooler and or freezer.Please refer to remarks on the drawings for additional plan check comments.Show location of employee change room when required by Health Dept. Show on the drawings accessibility compliance as required by Chapter 11B of 2010 CBC.