PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:
George MoranTEL:714
667-2771FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper.
Provide a statement on the title sheet of the plans that this project shall comply with following codes:
- 2010 California Residential Code (CRC)
- 2010 California Building Code (CBC)
- 2010 California Electrical Code (CEC)
- 2010 California Mechanical Code (CMC)
- 2010 California Plumbing Code (CPC)
- 2010 California Energy Code (CEnC)
- City of Santa Ana Municipal Code
Provide eave / overhang / projection setback to all property lines.
Show clearances between garage and new addition.
Demo plan is not clear , please show clearly which walls are being demo’d.
Identify which window is new or existing.Projections of dwelling units and accessory buildings without an automatic residential fire sprinkler protection are not permitted less than 2 feet to the property line and are required to be 1 hour fire rated on the underside with a fire separation distance between 2 feet and 5 feet. (CRC Table R302.1 (1)) Walls of dwelling units and accessory buildings without an automatic residential fire sprinkler protection with a fire separation distance less than 5 feet are required to have a full one hour rating. (CRC Table R302.1 (1)) Exterior wall penetrations less than 5’ in dwelling units and accessory buildings without an automatic residential fire sprinkler protection, or less than 3’ in dwelling units and accessory buildings with an automatic residential fire sprinkler protection shall comply with CRC Section R302.4.List the use of each room or area.Provide wall legend to distinguish between new / existing / demo walls.Show 30-inch clear width for water closet compartments and 24-inch clearance in front of a water closet. Show location of heating equipment on the plans. (CRC R303.8)Carbon monoxide alarms combined with smoke alarms shall comply with both sections R314 and section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms.All new construction, Interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000,, an approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel-burning appliances are installed and in dwelling units that have attached garages shall be provided with carbon monoxide alarms (CRC R315)
- Carbon monoxide alarms shall only be required in the specific dwelling unit or sleeping unit for
which the permit was obtained. Carbon monoxide alarms required by Sections R315.1 and
R315.2 shall be installed in the following locations: ________.
- Outside of each separate dwelling unit sleeping area in the immediate vicinity of the bedroom(s).
- On every level of a dwelling unit including basements.
- Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or
within a sleeping unit the alarm shall be interconnected in a manner that activation of one alarm
shall activate all of the alarms in the individual unit.
Exception:
Interconnection is not required in existing dwelling units where repairs do not result in the removal of wall and ceiling finishes, there is no access by means of attic, basement or crawl space, and no previous method for interconnection existed.For each enclosed attic space with a maximum vertical height greater than 30 inches, provide a minimum of 22 x 30 inches attic access. (CRC R807.1) Interior spaces intended for human occupancy shall be provided with heating facilities capable of maintaining a room temperature of 68 degrees Fahrenheit at a point 3 feet above the floor and 2 feet from exterior walls in all habitable rooms. (CRC R303.8)Bathroom or service room minimum window areas shall not be less than 3 square feet and 50% openable or, provide a mechanical ventilation system exhausted to the outside capable of providing 50 cubic feet per minute for intermittent ventilation 25 cubic feet per minute for continuous ventilation. (CRC R303.3) Bathrooms, laundry rooms, water closet compartments and similar rooms shall be mechanically ventilated in accordance with the CMC.Revise plans to indicate that a landing, with a width not less than the width of door and length in the direction of travel of not less than 36 inches, will be provided on each side of doors. The elevation of landing shall not exceed 1 ½ inch difference than the threshold of the doorway (7 3/4 inch if door does not swing over the landing or steps) in each direction. Revise plans at door from ________ to show compliance. (CRC R311.3.1) Specify that the maximum slope of any landing shall not exceed ¼ inch per foot. (CRC R311.3) Provide cross ventilation for attic and each enclosed rafter space as specified in CRC Section R806. Callout attic vents locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)Show exterior wall construction assembly. A minimum of one layer of No. 15 asphalt felt, free from holes and breaks, complying with ASTM D 226 for Type 1 felt shall be applied over studs of all exterior walls. Specify that two layers of Grade D or 60 minute Grade D paper shall be applied over all wood base sheathing. (CRC R703.2) Specify a minimum 0.019” (No. 26 galvanized sheet gage) corrosion-resistant or plastic weep screed located below foundation plate line and 4 inches above grade on all exterior stud walls or 2-inches above paved areas. (CRC R703.6.2.1)
On the drawings, provide Nailing Schedule in conformance with CRC Table R602.3(1).
Add note on foundation plan: All hold downs must be tied in place prior to foundation inspection.
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- All plumbing walls are to be framed with a minimum of 6" studs.
- Permissible notching and boring of joists are to be shown on the plans and shall not exceed CBC
Section 2308.10.4.2 allowances.
- Header and trimmer details for doors and windows are to be shown with full length trimmers,
specifying the size of the header and trimmer. (2308.10.4.3)
- All stud bearing walls are required to comply with the minimum requirements for load bearing walls.
Show location(s) and provide typical construction details. (2308.9)
Fasteners for preservative treated and fire treated wood shall be of hot dipped zinc coated galvanized steel, silicon bronze or copper. The coating weights for zinc coated fasteners shall be in accordance with ASTM A 153. CRC R317.3Additions and alterations are required to comply with 2008 CESC Section 152. Submit an energy compliance package showing compliance with package D or a complete performance analysis. (T24-1-10.103) Please call out ridge beam or ridge board size on the framing plan.Minimum braced wall panel length shall be accordance with CRC table R602.10.3.1.Provide beam for the new opening between existing sfd and addition.Provide interior shear wall in lieu of removing stucco.