Loading...
HomeMy WebLinkAbout168268_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings (667- 3600) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuancePlease fill out attached handicap compliance form.Enlarge handicap parking to show it is in compliance with path of travel .Provide minimum 30” x 48” clearance at the hand sink.Provide minimum 60” clear radius in the office.Provide a wall legend indicating whether the wall is: - Existing, new, or to be removed - A fire-resistive assembly - Bearing walls versus non-bearing partitionsProvide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Heights of partition, suspended ceiling, structure above.The width of the level area on the side to which the door swings shall extend 12” past the strike edge of the door for exterior doors and 18” past the edge for interior doors. CBC Section  1126A.3.2. (FOR WALK IN COOLER )Show location of tactile exit sign on the drawings.CBC Section 1110B.1.3, Check Stands CBC Table 11B-2: NUMBER OF REGULARNUMBER TO BE CHECKSTANDSACCESSIBLE 1 to 41 5 to 82 9 to 153 Over 153 plus 20% of additional aisles - In new and existing construction, accessible check stands shall provide a clear checkout aisle width of 36” with a maximum adjoining counter height not exceeding 38” above the finish floor. - The top of the counter lip shall not exceed 40” above the finish floor. - Accessible check stands shall always be open to customers with disabilities and shall be identified by a sign clearly visible to those in wheelchairs. The sign shall display the international symbol of accessibility in white on a blue background and shall state “This check stand to be open at all times for customers with disabilities.”Show height of the shelves on the drawings, for shelving between 6’-8’ high provide attachment detail.Show weight of the oven hood on the drawing.Show how oven hood will be supported.If there is type I hood, provide I-hr shaft.Provide complete construction detail for I-Hr shaft.Provide details on the drawings for the seismic restraint of water heater.Show If T-bar ceiling is new or existing.Provide a complete suspended ceiling system plan and section detail showing the following: - Vertical supports - Seismic wires - Seismic strut/Compression strut - Perimeter wires - Separate fixture wires for lights and mechanical devices - ICC Research Report number for the suspended ceilingThe reflected ceiling plan and details must show compliance with CBC Sections 711.3.1, 803, 1613, and 1705 (special inspection) for suspended ceiling systems.Verify if walk in cooler is prefabricated or custom built.For prefabricated walk in cooler provide ICC report, and for custom built walk in cooler provide complete construction detail.