HomeMy WebLinkAbout169207_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:
George MoranTEL:714
667-2771FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper.
Provide eave / overhang / projection setback to all property lines.
Show maximum 44” sill height for bedroom # 3.
Provide attic access at the new addition.Show location of heating equipment on the plans. (CRC R303.8)For an FAU located in the attic provide a minimum access of 22 x 30 inches, a 24-inch wide walkway, a 30-inch deep work platform, and electric light outlet adjacent to the furnace and switched by the opening. (CMC 904.11 & 305)Interior spaces intended for human occupancy shall be provided with heating facilities capable of maintaining a room temperature of 68 degrees Fahrenheit at a point 3 feet above the floor and 2 feet from exterior walls in all habitable rooms. (CRC R303.8)Specify that the maximum slope of any landing shall not exceed ¼ inch per foot. (CRC R311.3)
Add note on foundation plan: All hold downs must be tied in place prior to foundation inspection.
3”x3”x.229” steel plate washers are required on all anchor bolts in a braced wall line. (CRC R403.1.6.1)
Revise footing detail to show bottom rebar at least 3” CLEAR from ground below. (1907.5)
Show minimum 18-inch underfloor clearance from grade to bottom of floor joists and minimum 12-inch clearance to bottom of girders. (2304.11.2.1)
Note on the plans that foundation anchor bolts in walls shall have an approved plate washer under each nut; and the nuts shall be tightened just prior to covering the wall framing. Plate washers a minimum of 3 inch by 3 inch by 0.229 inch thick shall be used on each bolt. (AF&PA SDPWS 4.3.6.4.3)The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- All plumbing walls are to be framed with a minimum of 6" studs.Sills and sleepers in direct contact with concrete or masonry that is in direct contact with the ground and girders with less than ½” clearance to masonry and concrete shall be pressure treated or naturally durable to decay. (CRC R317.1 (3&4)) Note on plans that “Field-cutting ends, notches and drilled holes of preservative-treated wood shall be treated in the field in accordance with AWPA M4”. (CRC R317-1.1)
Call out anchor bolt size and spacing on foundation plan. Provide 1/2" diameter embedded 7" minimum at 6' o.c. maximum spacing (4' o.c. for 2 stories). CRC R403.1.6
Note on plan that holdown hardware must be secured in place prior to foundation inspection.
The end of wood girders entering exterior masonry or concrete walls shall be protected with a 1/2" air space or provide pressure treated lumber. CBC 2304.11.2.5.
Provide shear wall at the 4 sides of the new addition.
Provide post installed anchor bolts for new shear walls.
Add shear wall on north part of the garage for the total of 11’-8” shown on the drawings.
Specify on the framing plans the shear wall material, thickness, size and spacing of fasteners and sole plate nailing. Call out anchor bolt spacing and hold down hardware on foundation plan.
Verify if the new addition is conditioned or not.
The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.
- Signed Energy Efficiency Documents must be printed on the plans.
- Also, submit 2 copies of signed Energy Efficiency calculations.
- The permit applicant shall be responsible for obtaining an energy plan check from a consultant
who is qualified to perform an energy efficiency analysis in accordance with the California Code
of Regulations (CCR), Title 24, Part 1 (Administration) and Part 6 (2008 California Energy Code).
The plan check consultant must sign documentation certifying that a thorough, competent review
has been performed on behalf of the Enforcement Agency.
- The corrected/final drawings shall have the required energy efficiency compliance documentation
with completed signature blocks filed on the plans.
-The energy plan check consultant must sign documentation forms on behalf of the Building
Safety Division.